Science.gov

Sample records for installations nucleaires conclusions

  1. Sweet Conclusion

    ERIC Educational Resources Information Center

    Shirley, Britt M.; Wooldridge, Barbara Ross; Camp, Kerri M.

    2012-01-01

    Jen Harrington is the owner and pastry chef of Sweet Conclusion, a bakery in Tampa, Florida. Most of Harrington's business comes from baking wedding cakes, but she has been attempting to attract customers to her retail bakery, where she sells cupcakes, pies, ice cream, and coffee. Nearly four years she opened Sweet Conclusion, the retail part of…

  2. Beginning without a Conclusion.

    ERIC Educational Resources Information Center

    Frazier, Richard

    1988-01-01

    Describes a series of activities without conclusions to introduce scientific reasoning in a ninth grade physical science course. Uses popcorn popping to get students to think about the concepts of graphing, histograms, frequency, probability, and scientific methodology. (CW)

  3. Conclusion

    NASA Astrophysics Data System (ADS)

    Ivancevic, Vladimir G.; Reid, Darryn J.

    2015-11-01

    It is often held that things should always be made simple, which presumes that either that they can always be made simple or that all the jetisoned logic doesn't matter anyway. Alledgedly, anything should be explainable so that anyone can understand it. Don't get bogged down in dreary details. It should be effortless for the reader: low-dimensional systems exhibit complex behaviour while high-dimensional systems exhibit simple behaviour (to return to our prolegomonal opening), competition is a universal solution, demand must increase as price falls, and everything under the sun neatly fits a power law. Or so the story goes...

  4. Conclusion

    NASA Technical Reports Server (NTRS)

    Arnold, Steven M.; Wong, Terry T.

    2011-01-01

    This compilation of papers in this book represents approximately half of the works discussed at the MS&T 2010 symposium entitled Tools, Models, Databases, and Simulation Tools Developed and Needed to Realize the Vision of Integrated Computational Materials Engineering at Materials Science & Technology wherein five sessions comprised of 33 presentations was organized. The goal of the symposium was two fold To provide a forum in which current state-of-the-art methods for ICME (e.g., information informatics, experimentation, and modeling) could be openly discussed and critiqued by not only materials scientist but also structural engineers/researchers, component designers, industrial leaders and government program managers. To leave the symposium and in particular the panel discussion with a clear idea of the gaps and barriers (both technical, cultural and economical) that must be addressed in order for ICME to fully succeed. The organizers felt that these goals were met, as particularly evident by the standing room only attendance during a lively panel discussion session at the end of the Symposium. However it is the firm belief of the editors of this book that this symposium was merely a start in the right direction, and that subsequent conferences/symposium (e.g., First World Congress on Integrated Computational Materials Engineering to be held July 10-14, 2011 at Seven Springs Mountain Resort in Pennsylvania) must work hard to ensure that a truly diverse, multidisciplinary, community of researchers and practitioners are present and have ample opportunity for interaction. This will ensure that a proper balance between push and pull disciplines and technologies is maintained so that this emerging focus area, Integrated Computational Materials Engineering (ICME), has the greatest potential for success and impact on "system-level" payoffs. Similarly, a pro-active approach is required to reform historical modes of operation in industry, government and the academic sectors so as to facilitate multidisciplinary collaboration and to clearly articulate the vision and scope of ICME.

  5. Conclusions

    NASA Astrophysics Data System (ADS)

    Ahonen, Pasi; Alahuhta, Petteri; Daskala, Barbara; Delaitre, Sabine; Hert, Paul De; Lindner, Ralf; Maghiros, Ioannis; Moscibroda, Anna; Schreurs, Wim; Verlinden, Michiel

    Some say that an increase in security does not necessarily mean a further encroachment on privacy - indeed, security is necessary to protect personal data and our privacy. Networks must be secure, our personal devices, reliable, dependable and trustworthy. But security is a multifaceted term, with many dimensions. We are of the view that an increase in security most likely will encroach upon our privacy in an ambient intelligence world. Surveillance cameras will continue to proliferate. We assume that, whatever the law is, whatever privacy protections government and business say they honour, our telecommunications, e-mails and Internet usage will be monitored to an increasing degree. The same will be true of our interfaces with the world of ambient intelligence.

  6. Conclusion

    NASA Astrophysics Data System (ADS)

    Thoma, Klaus; Hiller, Daniel; Leismann, Tobias; Drees, Birgit

    Considering the breadth of perspectives in security research among Europeans, as exemplified within this publication, one may certainly note that a tremendous development of this young discipline has occurred in a short period of time. Only three years have passed since the discipline was promoted to an individual theme within the specific programme on `Cooperation' of the European Commission FP7. Since then, a conceptual framework has been established and the first collaborative projects have been executed on different levels, all at an impressive pace. Although the future of security research will remain closely linked to the political will of EU member states, the established base will serve as a solid foundation for the further development of the discipline on a European scale.

  7. Lighting installations

    NASA Technical Reports Server (NTRS)

    Schurer, Kees

    1994-01-01

    Model computations that give the lay-out of a lighting installation have to be implemented in the real world. There, deviations from the ideal performance of just about every element of the installation will be felt. A list of possible sources of non-ideal behavior, based on practical experience, are: lamps, ballasts, reflectors, mounting position, sagging of lamps, and soiling. It is clear that with all possible deviations from the ideal the homogeneity of a real lighting installation can never be as good as the one computed. The only way to make sure it is nearly as good is by measurement of the actual light distribution. Then, an occasional adjustment or replacement may often yield a satisfactory result. This measurement should really be part of the installation contract.

  8. Conclusions. [hydrogen-based energy

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Conclusions are presented according to general areas of technology with some specific examples of research and technology needs identified. These conclusions provide a base for the future development of detailed program plans and identify research needs that are not being given attention or are not being supported at a sufficient level. Emphasis is placed on hydrogen production and use.

  9. Conclusive exclusion of quantum states

    NASA Astrophysics Data System (ADS)

    Bandyopadhyay, Somshubhro; Jain, Rahul; Oppenheim, Jonathan; Perry, Christopher

    2014-02-01

    In the task of quantum state exclusion, we consider a quantum system prepared in a state chosen from a known set. The aim is to perform a measurement on the system which can conclusively rule that a subset of the possible preparation procedures cannot have taken place. We ask what conditions the set of states must obey in order for this to be possible and how well we can complete the task when it is not. The task of quantum state discrimination forms a subclass of this set of problems. Within this paper, we formulate the general problem as a semidefinite program (SDP), enabling us to derive sufficient and necessary conditions for a measurement to be optimal. Furthermore, we obtain a necessary condition on the set of states for exclusion to be achievable with certainty, and we give a construction for a lower bound on the probability of error. This task of conclusively excluding states has gained importance in the context of the foundations of quantum mechanics due to a result from Pusey, Barrett, and Rudolph (PBR). Motivated by this, we use our SDP to derive a bound on how well a class of hidden variable models can perform at a particular task, proving an analog of Tsirelson's bound for the PBR experiment and the optimality of a measurement given by PBR in the process. We also introduce variations of conclusive exclusion, including unambiguous state exclusion, and state exclusion with worst-case error.

  10. Solar installer's training program

    SciTech Connect

    Schmidt, W.J.; Philbin, J.

    1981-01-01

    Instructions are given for the installation of solar domestic water heating systems, space heating systems, and pool heating systems. The basic procedures for installing any solar heating system are presented with reference to solar domestic hot water systems, and the space and pool systems are taught on that basis. (LEW)

  11. MUSE dream conclusion: the sky verdict

    NASA Astrophysics Data System (ADS)

    Caillier, P.; Accardo, M.; Adjali, L.; Anwand, H.; Bacon, R.; Boudon, D.; Capoani, L.; Daguisé, E.; Dupieux, M.; Dupuy, C.; Francois, M.; Glindemann, A.; Gojak, D.; Gonté, F.; Haddad, N.; Hansali, G.; Hahn, T.; Jarno, A.; Kelz, A.; Koehler, C.; Kosmalski, J.; Laurent, F.; Larrieu, M.; Lizon, J.-L.; Loupias, M.; Manescau, A.; Migniau, J.-E.; Monstein, C.; Nicklas, H.; Parès, L.; Pécontal-Rousset, A.; Piqueras, L.; Reiss, R.; Remillieux, A.; Renault, E.; Rupprecht, G.; Streicher, O.; Stuik, R.; Valentin, H.; Vernet, J.; Weilbacher, P.; Zins, G.

    2014-08-01

    MUSE (Multi Unit Spectroscopic Explorer) is a second generation instrument built for ESO (European Southern Observatory). The MUSE project is supported by a European consortium of 7 institutes. After the finalisation of its integration in Europe, the MUSE instrument has been partially dismounted and shipped to the VLT (Very Large Telescope) in Chile. From October 2013 till February 2014, it has then been reassembled, tested and finally installed on the telescope its final home. From there it collects its first photons coming from the outer limit of the visible universe. This critical moment when the instrument finally meets its destiny is the opportunity to look at the overall outcome of the project and the final performance of the instrument on the sky. The instrument which we dreamt of has become reality. Are the dreamt performances there as well? These final instrumental performances are the result of a step by step process of design, manufacturing, assembly, test and integration. Now is also time to review the path opened by the MUSE project. What challenges were faced during those last steps, what strategy, what choices did pay off? What did not?

  12. 4.11 Summary and Conclusions

    NASA Astrophysics Data System (ADS)

    Noßke, D.; Mattsson, S.; Johansson, L.

    This document is part of Subvolume A 'Fundamentals and Data in Radiobiology, Radiation Biophysics, Dosimetry and Medical Radiological Protection' of Volume 7 'Medical Radiological Physics' of Landolt-Börnstein - Group VIII 'Advanced Materials and Technologies'. It contains the Section '4.11 Summary and Conclusions' of the Chapter '4 Dosimetry in Nuclear Medicine Diagnosis and Therapy'.

  13. AMS Time Lapse Installation

    NASA Video Gallery

    A time lapse video compilation of the installation of the Alpha Magnetic Spectrometer on the International Space Station’s starboard truss using the station’s robotic arm, Canadarm2, during the...

  14. The common premise for uncommon conclusions.

    PubMed

    Coady, C A J

    2013-05-01

    Recent controversy over philosophical advocacy of infanticide (or the comically-styled euphemism 'postnatal abortion') reveals a surprisingly common premise uniting many of the opponents and supporters of the practice. This is the belief that the moral status of the early fetus or embryo with respect to a right to life is identical to that of a newly born or even very young baby. From this premise, infanticidists and strong anti-abortionists draw opposite conclusions, the former that the healthy newly born have no inherent right to life and the latter that minute embryos and the very early fetus have the same right to life as young babies. (Indeed strong anti-abortionists tend to regard this right to life as identical to that possessed by adult humans.) This paper argues that these opposed conclusions are both deeply implausible and that the implausibility resides in the common premise. The argument requires some attention to the structure of the philosophical case underpinning the supposed vice of speciesism that has been given intellectual currency by many philosophers, most notably Peter Singer, and also to the reasoning behind the strong anti-abortionist adoption of the common premise. PMID:23637428

  15. Epistemology applied to conclusions of expert reports.

    PubMed

    Lucena-Molina, Jose-Juan

    2016-07-01

    It is believed that to build a robust reasoning logic to make probabilistic inferences in forensic science from a merely mathematical or logistical viewpoint is not enough. Mathematical logic is the positive science of reasoning and as for that it is only interested in the positive calculus of its validity, regardless any prior ontological assumption. But without a determined ontology and epistemology which imply to define the concepts that they will use, it seems difficult that the proposed scientifically correct mathematical solution be successful as a European standard for making conclusions in forensic reports because it has to be based on judicial language. Forensic experts and Courts are not interested in the development of a positive science but in a practical science: in clarifying whether certain known facts are related to a possible crime. Therefore, not only the coherence of the demonstrative logic reasoning used (logic of propositions) is important, but also the precision of the concepts used by language and consistency among them in reasoning (logic of concepts). There is a linguistic level essential for a successful communication between the forensic practitioner and the Court which is mainly related, in our opinion, to semantics and figures of speech. The first one is involved because words used in forensic conclusions often have different meanings - it is said that they are polysemic - and the second one because there is often metonymy as well. Besides, semantic differences among languages regarding words with the same etymological root add another difficulty for a better mutual understanding. The two main European judicial systems inherit a wide and deep culture related to evidence in criminal proceedings and each of them has coined their own terminology but there are other two more abstract levels such as logical and epistemological, where we can find solid arguments by which terms used at legal level on conclusions of forensic reports could be

  16. Digital Sculpture Installations

    ERIC Educational Resources Information Center

    Sherwood, Catherine

    2006-01-01

    This author relates how she came upon the idea of using an image-editing program to virtually install monumental sculptures into real-life landscapes in her desire to bring technology and sculpture together in her art class. In this article, she describes how she made her class create tabletop-sized sculptures and photographs of digital…

  17. The Apollo SWC Experiment: Results, Conclusions, Consequences

    NASA Astrophysics Data System (ADS)

    Geiss, J.; Bühler, F.; Cerutti, H.; Eberhardt, P.; Filleux, Ch.; Meister, J.; Signer, P.

    2004-01-01

    interplanetary space at the time of the five foil exposures. Finally, we discuss, from today's perspective, some of the implications and conclusions that can be drawn from the SWC results, concerning the Sun and its history, the solar system, the galaxy and the universe.

  18. Mineral mining installation

    SciTech Connect

    Arsuaga, Y.

    1983-07-05

    A mineral mining installation is provided for use in a steeply-inclined longwall working. The installation comprises a ladder-shaped support frame, and a plurality of roof support units. The support frame extends along the entire length of the longwall working, and has a pair of generally parallel longitudinal beams interconnected by a plurality of transverse beams. The roof support units are positioned between the longitudinal beams, and are supported on the transverse beam. Each of the longitudinal beams comprises a plurality of beam sections pivotably connected together end-to-end. The support frame comprises a plurality of detachably connected sub-frames, each of which comprises a respective transverse beam and a respective beam section of each of the longitudinal beams.

  19. Mineral mining installation

    SciTech Connect

    Plevak, L.; Weirich, W.

    1982-04-20

    A longwall mineral mining installation has a longwall conveyor and a plurality of roof support units positioned side-by-side at the goaf side of the conveyor. The hydraulic appliances of the roof support units, such as their hydraulic props, hydraulic advance rams and hydraulic control valves, are supplied with pressurized hydraulic fluid from hydraulic supply lines which run along the goaf side of the conveyor. A plurality of flat, platelike intermediate members are provided at the goaf side of the conveyor. These intermediate members are formed with internal ducts for feeding the hydraulic fluid from the supply lines to the hydraulic appliances of the roof support units.

  20. Radiator Design and Installation

    NASA Technical Reports Server (NTRS)

    Brevoort, M.J.; Leifer, M.

    1939-01-01

    The fundamental principles of fluid flow, pressure losses, and heat transfer have been presented and analyzed for the case of a smooth tube with fully developed turbulent flow. These equations apply to tubes with large length-diameter ratios where the f1ow is at a high Reynolds Number. The error introduced by using these equations increases as the magnitude of the tube length and the air-flow Reynolds Number approaches the values encountered in modern radiator designs. Accordingly, heat-transfer tests on radiator sections were made and the results are presented in nondimensional form to facilitate their use and for comparison with other heat-transfer data. In addition, pressure losses were measured along smooth tubes of circular, square, and rectangular cross section and the results were also correlated and are presented in nondimensional form. The problem of a radiator design for a particular installation is solved, the experimental heat-transfer and pressure-loss data being used, on a basis of power chargeable to the radiator for form drag, for propelling the weight, and for forcing the air through the radiator. The case of an installation within a wing or an engine nacelle is considered. An illustration of radiator design is carried through for an arbitrary set of conditions. Sufficient detail is given to enable the reader to reproduce the analysis for any given case.

  1. Seal ring installation tool

    NASA Technical Reports Server (NTRS)

    Haselmaier, L. Haynes (Inventor)

    2004-01-01

    A seal ring tool that allows an installer to position a primary seal ring between hub ends of pipe flanges that are being assembled together. The tool includes a pivoting handle member and extension arms attached to the pivoting handle member. The ends of the arms have side indentation type longitudinal grooves angled toward one another for holding the primary seal ring in place between the hubs of respective pipes that are to be attached together. The arms of the tool can also have flat sides that can be used to abut against an optional second larger seal that is supported within a groove in one of the hub ends so that the second hub end can then be moved against the other side of the primary seal ring. Once the seal ring is positioned between the pipe hubs, the pipe hubs can be moved about the seal ring due to the flat sides of the arms of the tool. The tool eliminates the chances of damaging and contaminating seal rings being installed within pipe hubs that are being attached to one another.

  2. Heating equipment installation system

    DOEpatents

    Meuschke, Robert E.; Pomaibo, Paul P.

    1991-01-01

    A method for installing a heater unit assembly (52, 54) in a reactor pressure vessel (2) for performance of an annealing treatment on the vessel (2), the vessel (2) having a vertical axis, being open at the top, being provided at the top with a flange (6) having a horizontal surface, and being provided internally, at a location below the flange (6), with orientation elements (8) which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture (10) having an upwardly extending guide member (18) and orientation elements (14, 16) and installing the orientation fixture (10) in the vessel (2) so that the orientation elements (14,16) of the orientation fixture (10) mate with the orientation elements (8) of the pressure vessel (2) in order to establish a defined position of the orientation fixture (10) in the pressure vessel (2), and so that the guide member (18) projects above the pressure vessel (2) flange (6); placing a seal ring (30) in a defined position on the pressure vessel (2) flange (6) with the aid of the guide member (18); mounting at least one vertical, upwardly extending guide stud (40) upon the seal ring (30); withdrawing the orientation fixture (10) from the pressure vessel (2); and moving the heater unit assembly (52,54) vertically downwardly into the pressure vessel (2) while guiding the heater unit assembly (52,54) along a path with the aid of the guide stud (40).

  3. Microminiature thermocouple monitors own installation

    NASA Technical Reports Server (NTRS)

    Garrett, A. J.; Sellers, J. P., Jr.

    1966-01-01

    Microminiature thermocouple makes precision gas sidewall temperature readings inside large thrust chambers. It is installed by a technique whereby the sensor monitors its own installation to insure against thermal damage to the thermocouple and ensure minimum disturbance to chamber surfaces.

  4. Achieving a quiet rooftop installation

    SciTech Connect

    Harold, R.G.

    1993-12-01

    This article examines the design considerations for quiet roof top installations of air conditioning systems. The topics of the article include the elements of a quiet installation, acoustic design requirements for minimizing noise problems, incorporating system requirements into the overall design of the building, and survival of the system design through bid review and installation.

  5. Installing fiber insulation

    NASA Technical Reports Server (NTRS)

    Wang, D. S.; Warren, A. D. (Inventor)

    1980-01-01

    A method for installing fragile, high temperature insulation batting in an elongated cavity or in a resilient wire sleeve to form a resilient seal. The batting is preformed to rough dimensions and wrapped in a plastic film, the film being of a material which is fugitive at a high temperature. The film is heat sealed and trimmed to form a snugly fit skin which overlaps at least at one end to permit attachment of a pull cord. The film absorbs the tensile force of pulling the film enclosed batting through the cavity or wire mesh sleeve and is subsequently driven off by high temperature baking, leaving only the insulation in the cavity or wire mesh sleeve.

  6. Study on installation of the submersible mixer

    NASA Astrophysics Data System (ADS)

    Tian, F.; Shi, W. D.; He, X. H.; Jiang, H.; Xu, Y. H.

    2013-12-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice.

  7. Longwall mineral mining installation

    SciTech Connect

    Becker, K.; Beyer, H.

    1982-09-14

    A longwall mineral mining installation comprises a scraper-chain conveyor having a scraper assembly, a first straight conveyor portion extending along the longwall working, a second straight conveyor portion extending along a roadway positioned at one end of the longwall working, and a curved conveyor section connecting the two straight conveyor portions. A guide assembly is provided for guiding the scraper assembly around the curved conveyor section. A guide is fixed to the face side of the first straight conveyor portion, and a winning machine is reciprocable along the guide. A drive station is mounted on the goaf side of the first straight conveyor portion in the region of the curved conveyor section. A drive sprocket is rotatably mounted on the face side of the first straight conveyor portion in said region. The drive sprocket drives the winning machine via a drive chain. A drive shaft drivably connects the drive station and the drive sprocket. The drive station includes a drive motor whose axis of rotation is substantially parallel to the longitudinal axis of the first straight conveyor portion, and the guide is angled away from the first straight conveyor portion in said region.

  8. Mineral mining installation

    SciTech Connect

    Becker, K.; Rosenberg, H.; Weirich, W.

    1981-12-29

    A longwall mineral mining installation has a conveyor and a plurality of roof support units positioned side-by-side on the goaf side of the conveyor. Each roof support unit has a roof shield having an advanceable shield extension. Each unit has a first hydraulic ram for extending its shield extension, and a second hydraulic ram for advancing the conveyor. The extension of each first ram is controlled in dependence upon the retraction of one of the second rams (Either the second ram of the same unit or that of an adjacent unit). This control is effected by controlling the supply of pressurized hydraulic fluid to the first rams. In one embodiment this is carried out by a control valve which has a spring-loaded plunger which engages with a series of equispaced cams on the movable cylinder of the associated second ram. In another embodiment, the piston rods of the rams are provided with series of equispaced magnets. The cylinders of the rams are provided with sensors, which sense the magnets and generate control signals. A control box is provided to direct the control signals to control valves associated with the rams, so that the first rams are extended by the same distance as that through which the second rams are retracted.

  9. Mineral mining installation

    SciTech Connect

    Weirich, W.

    1984-01-24

    A longwall mineral mining installation has a conveyor and a plurality of roof support units positioned side-by-side on the goaf side of the conveyor. Each roof support unit has a roof shield having an advanceable shield extension. Each unit has a first hydraulic ram for extending its shield extension, and a second hydraulic ram for advancing the conveyor. The extension of each first ram is controlled in dependence upon the retraction of one of the second rams (either the second ram of the same unit or that of an adjacent unit). This control is effected by controlling the supply of pressurized hydraulic fluid to the first rams. In one embodiment this is carried out by a control valve which has a springloaded plunger which engages with a series of equispaced cams on the movable cylinder of the associated second ram. In another embodiment, the piston rods of the rams are provided with series of equispaced magnets. The cylinders of the rams are provided with sensors, which sense the magnets and generate control signals. A control box is provided to direct the control signals to control valves associated with the rams, so that the first rams are extended by the same distance as that through which the second rams are retracted.

  10. Air Bag Installation

    NASA Technical Reports Server (NTRS)

    2003-01-01

    May 10, 2003Prelaunch at Kennedy Space Center

    On Mars Exploration Rover 1 (MER-1) , air bags are installed on the lander. The airbags will inflate to cushion the landing of the spacecraft on the surface of Mars. When it stops bouncing and rolling, the airbags will deflate and retract, the petals will open to bring the lander to an upright position, and the rover will be exposed. NASA's twin Mars Exploration Rovers are designed to study the history of water on Mars. These robotic geologists are equipped with a robotic arm, a drilling tool, three spectrometers, and four pairs of cameras that allow them to have a human-like, 3D view of the terrain. Each rover could travel as far as 100 meters in one day to act as Mars scientists' eyes and hands, exploring an environment where humans can't yet go. MER-1 is scheduled to launch June 25 as MER-B aboard a Delta II rocket from Cape Canaveral Air Force Station.

  11. CHP Installed Capacity Optimizer Software

    Energy Science and Technology Software Center (ESTSC)

    2004-11-30

    The CHP Installed Capacity Optimizer is a Microsoft Excel spreadsheet application that determines the most economic amount of capacity of distributed generation and thermal utilization equipment (e.g., absorption chillers) to install for any user-defined set of load and cost data. Installing the optimum amount of capacity is critical to the life-cycle economic viability of a distributed generation/cooling heat and power (CHP) application. Using advanced optimization algorithms, the software accesses the loads, utility tariffs, equipment costs,more » etc., and provides to the user the most economic amount of system capacity to install.« less

  12. CHP Installed Capacity Optimizer Software

    SciTech Connect

    2004-11-30

    The CHP Installed Capacity Optimizer is a Microsoft Excel spreadsheet application that determines the most economic amount of capacity of distributed generation and thermal utilization equipment (e.g., absorption chillers) to install for any user-defined set of load and cost data. Installing the optimum amount of capacity is critical to the life-cycle economic viability of a distributed generation/cooling heat and power (CHP) application. Using advanced optimization algorithms, the software accesses the loads, utility tariffs, equipment costs, etc., and provides to the user the most economic amount of system capacity to install.

  13. Solar Installation Labor Market Analysis

    SciTech Connect

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  14. Application-Program-Installer Builder

    NASA Technical Reports Server (NTRS)

    Wolgast, Paul; Demore, Martha; Lowik, Paul

    2007-01-01

    A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.

  15. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery § 119.220 Installations. (a) The installation requirements for machinery and boilers for steam and...) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic jets; and (4)...

  16. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Machinery § 119.220 Installations. (a) The installation requirements for machinery and boilers for steam and...) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic jets; and (4)...

  17. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Machinery § 119.220 Installations. (a) The installation requirements for machinery and boilers for steam and...) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic jets; and (4)...

  18. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Machinery § 119.220 Installations. (a) The installation requirements for machinery and boilers for steam and...) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic jets; and (4)...

  19. 37 CFR 251.52 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... COPYRIGHT ARBITRATION ROYALTY PANEL RULES AND PROCEDURES COPYRIGHT ARBITRATION ROYALTY PANEL RULES OF PROCEDURE Procedures of Copyright Arbitration Royalty Panels § 251.52 Proposed findings and conclusions....

  20. 37 CFR 251.52 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COPYRIGHT ARBITRATION ROYALTY PANEL RULES AND PROCEDURES COPYRIGHT ARBITRATION ROYALTY PANEL RULES OF PROCEDURE Procedures of Copyright Arbitration Royalty Panels § 251.52 Proposed findings and conclusions....

  1. SUB-SLAB PROBE INSTALLATION

    EPA Science Inventory

    Sub-slab sampling has become an integral part of vapor intrusion investigations. It is now recommended in guidance documents developed by EPA and most states. A method for sub-slab probe installation was devised in 2002, presented at conferences through 2005, and finally docume...

  2. Horizontal drilling installs dutch waterline

    SciTech Connect

    Not Available

    1986-08-01

    A 32-in. potable water line system, installed by Van Eijk Leidingen B.V. in Holland, was laid through an intensively cultivated vegetable gardening area, and designed to furnish additional irrigation water. Using a horizontally drilled 42-in. hole under the Maasdijk, though a difficult job, reduced the length by more than 3 miles.

  3. Turnkey Systems: Selection and Installation.

    ERIC Educational Resources Information Center

    Gray, Carolyn M.

    1983-01-01

    This article offers a working definition and general comments on the purchasing of library turnkey systems (package including hardware and software required to accomplish a clearly defined task). Turnkey versus customized, selecting a turnkey system, request for proposal, contracting with vendors, and post installation evaluation are discussed.…

  4. Solar Water Heater Installation Package

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  5. Vessels installed at A-3

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Construction of the A-3 Test Stand approaches another milestone with delivery and installation of water, isopropyl alcohol (IPA) and liquid oxygen (LOX) tanks. The three LOX tanks shown on the left and the two IPA tanks shown on the right are all 35,000 gallons each. The four water tanks in the center are 39,000 gallons each.

  6. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Proposed findings and conclusions. 2.712 Section 2.712 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES OF PRACTICE AND PROCEDURE Rules for Formal Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed...

  7. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Proposed findings and conclusions. 2.712 Section 2.712 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES OF PRACTICE AND PROCEDURE Rules for Formal Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed...

  8. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Proposed findings, conclusions and orders. 2700.65 Section 2700.65 Labor Regulations Relating to Labor (Continued) FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of...

  9. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Proposed findings, conclusions and orders. 2700.65 Section 2700.65 Labor Regulations Relating to Labor (Continued) FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of...

  10. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Proposed findings, conclusions, and order. 511.46 Section 511.46 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ADJUDICATIVE PROCEDURES Hearings § 511.46 Proposed findings, conclusions, and...

  11. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Proposed findings, conclusions and orders. 2700.65 Section 2700.65 Labor Regulations Relating to Labor (Continued) FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of...

  12. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... submit proposed findings of fact, conclusions of law, orders, and supporting reasons. Unless given orally... record or given consideration. (b) Except when presented orally before the close of the hearing, proposed... proposed findings. Each proposed conclusion shall be separately stated. (c) Except when presented...

  13. On symbolic models for Single-Conclusion Logic of Proofs

    SciTech Connect

    Krupski, Vladimir N

    2011-05-31

    In this paper we define symbolic models for Single-Conclusion Logics of Proofs. We prove the soundness and completeness of these logics with respect to the corresponding classes of symbolic models. We apply the semantic methods developed in this paper to justify the use of terms of single-conclusion logic of proofs as notation for derivations in this logic. Bibliography: 17 titles.

  14. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 6 2011-10-01 2011-10-01 false Proposed findings, conclusions, and order. 511.46 Section 511.46 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ADJUDICATIVE PROCEDURES Hearings § 511.46 Proposed findings, conclusions, and...

  15. Move Sequences in Graduate Research Paper Introductions and Conclusions

    ERIC Educational Resources Information Center

    Madrunio, Marilu Rañosa

    2012-01-01

    Graduate students submit academic papers at the end of the term as part of their coursework. Such papers contain introduction moves which may be troublesome and conclusion moves which may contain sub-moves not really required. This paper is aimed at assessing what particular moves are employed in the introduction and conclusion sections of 21…

  16. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  17. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  18. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  19. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  20. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  1. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  2. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  3. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  4. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  5. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  6. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  7. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  8. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  9. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  10. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  11. Engineering report for simulated riser installation

    SciTech Connect

    Brevick, C.H., Westinghouse Hanford

    1996-05-09

    The simulated riser installation field tests demonstrated that new access ports (risers) can be installed safely, quickly, and economically in the concrete domes of existing underground single- shell waste storage tanks by utilizing proven rotary drilling equipment and vacuum excavation techniques. The new riser installation will seal against water intrusion, provide as table riser anchored to the tank dome, and be installed in accordance with ALARA principles. The information contained in the report will apply to actual riser installation activity in the future.

  12. Taiwanese, Chinese treatment facilities installed

    SciTech Connect

    Not Available

    1990-02-19

    This article reports on water treatment facilities from a U.S. company installed in a major Taiwanese refinery and in two mainland Chinese oil fields. Chinese Petroleum Corp. recently installed a wastewater treatment plant at its Kaohsiung, Taiwan, refinery. The treatment plant was needed because of expansion of the refinery's naphtha-cracking facilities at the 446,500-b/d refinery, the largest refinery, in terms of crude charging capacity, in the Asia/Pacific region. The same system has also gone into two oil field applications in the People's Republic of China: the Zhongyuan and Shengli oil fields. The system is designed for a total wastewater flow rate of 10,000 cu m/hr. The system and its treatment requirements are summarized.

  13. Newly Installed S-1 Truss

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Launched October 7, 2002 aboard the Space Shuttle Orbiter Atlantis, the STS-112 mission lasted 11 days and performed three sessions of Extra Vehicular Activity (EVA). Its primary mission was to install the Starboard (S1) Integrated Truss Structure and Equipment Translation Aid (CETA) Cart to the International Space Station (ISS). The S1 truss provides structural support for the orbiting research facility's radiator panels, which use ammonia to cool the Station's complex power system. The S1 truss, attached to the S0 (S Zero) truss installed by the previous STS-110 mission, flows 637 pounds of anhydrous ammonia through three heat rejection radiators. The truss is 45-feet long, 15-feet wide, 10-feet tall, and weighs approximately 32,000 pounds. The CETA is the first of two human-powered carts that will ride along the International Space Station's railway providing a mobile work platform for future extravehicular activities by astronauts. This is a view of the newly installed S1 Truss as photographed during the mission's first scheduled EVA. The Station's Canadarm2 is in the foreground. Visible are astronauts Piers J. Sellers (lower left) and David A. Wolf (upper right), both STS-112 mission specialists.

  14. A note on jacket installation

    SciTech Connect

    Teigen, P.

    1994-12-31

    The traditional way to secure the on site stability of jacket structures is by piling the foundation to the sea floor. The process of piling is both expensive and time consuming, and as an alternative it has been proposed to use bucket shaped concrete foundations. The principle of this is that large, heavy pods, made up from steel and concrete, and shaped like inverted buckets should penetrate the soil, much like the skirts of a condeep, and thus provide a stable, reliable basis for the jacket structure. With four pods, each of the main legs will be solidly resting on and anchored to a concrete block. The structure is to be installed in one piece. The idea is convenient and appealing. However, there are potential hazards. One essential requirement is that such a structure should be safely and correctly installed in a controlled manner at a prescribed location by a conventional crane vessel. Once the structure has made contact with the sea bed, the possibilities for adjusting the position or inclination quickly becomes marginal. The dynamics of the jacket during installation is discussed at some length below, with particular attention given to the critical phase when the sea bed is approached.

  15. Jumping to conclusions and paranoid ideation in the general population.

    PubMed

    Freeman, Daniel; Pugh, Katherine; Garety, Philippa

    2008-07-01

    An association of a 'jumping to conclusions' (JTC) reasoning style and delusions has been repeatedly found. The data-gathering bias has been particularly implicated with higher levels of delusional conviction in schizophrenia. For the first time the symptom, psychological and social correlates of jumping to conclusions are examined in a large general population sample. This is based upon the recognition that delusional ideation in non-clinical populations is on a continuum of severity with delusions in psychosis. Two hundred individuals completed a probabilistic reasoning task and assessments of paranoid ideation, intellectual functioning, affective symptoms, anomalies of experience, cognitive flexibility, illicit drug use, social support, and trauma. The jumping to conclusions reasoning bias was found in 20% of the non-clinical sample. JTC was strongly associated with higher levels of conviction in paranoid thoughts and the occurrence of perceptual anomalies, but not with the presence of affective symptoms. The results indicate that jumping to conclusions is a reasoning bias specifically associated with levels of delusional conviction, and is not a product of generally high levels of distress and affect. The association of jumping to conclusions with the types of anomalies of experience seen in psychotic disorders is intriguing, and consistent with recent dopamine dysregulation theories and the importance of reasoning to perception. The study is a further illustration of the need to consider the dimensions of delusional experience separately. PMID:18442898

  16. Emotion in Painting and Art Installations.

    PubMed

    Konečni, Vladimir J

    2015-01-01

    Paintings are static 2-dimensional images with limited narrative means. On the basis of a critical analysis of the relevant laboratory scaling studies, museum studies, and neuroaesthetic work, the article reaches a negative conclusion about most paintings' ability to engage sufficiently with general viewers' associative-memory systems, so as to lead to identification and empathy, and induce fundamental psychobiological emotions. In contrast, designers of art installations can draw on subtle combinations of several classes of stimulus properties with psychological significance subsumable under the classical concept of the sublime (physical grandeur, rarity, an association with beauty and with biologically significant outcomes), so that some installations may induce the peak aesthetic emotional response, aesthetic awe--as defined in Aesthetic Trinity Theory (Konečni, 2005, 2011), along with the states of being moved and physiological thrills. The approach also involves an analytical skepticism about emotivism, defined as a culturological proclivity for unnecessary insertion of emotion into accounts of mental life and behavior, especially in the arts. Implications for the role of emotion theory in empirical aesthetics are examined. PMID:26442338

  17. A happy conclusion to the SALT image quality saga

    NASA Astrophysics Data System (ADS)

    Crause, Lisa A.; O'Donoghue, Darragh E.; O'Connor, James E.; Strumpfer, Francois; Strydom, Ockert J.; Sass, Craig; du Plessis, Charl A.; Wiid, Eben; Love, Jonathan; Brink, Janus D.; Wilkinson, Martin; Coetzee, Chris

    2012-09-01

    Images obtained with the Southern African Large Telescope (SALT) during its commissioning phase showed degradation due to a large focus gradient and a variety of other optical aberrations. An extensive forensic investigation eventually traced the problem to the mechanical interface between the telescope and the secondary optics that form the Spherical Aberration Corrector (SAC). The SAC was brought down from the telescope in 2009 April, the problematic interface was replaced and the four corrector mirrors were optically tested and re-aligned. The surface figures of the SAC mirrors were confirmed to be within specification and a full system test following the re-alignment process yielded a RMS wavefront error of just 0.15 waves. The SAC was re-installed on the tracker in 2010 August and aligned with respect to the payload and primary mirror. Subsequent on-sky tests produced alarming results which were due to spurious signals being sent to the tracker by the auto-collimator, the instrument responsible for controlling the attitude of the SAC with respect to the primary mirror. Once this minor issue was resolved, we obtained uniform 1.1 arcsecond star images over the full 10 arcminute field of view of the telescope.

  18. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  19. Safety Specialist Manpower Conclusions and Recommendations, Volume IV.

    ERIC Educational Resources Information Center

    Booz Allen and Hamilton, Inc., Washington, DC.

    This final volume of a four-volume report on highway safety manpower includes conclusions and recommendations regarding prospects for staffing individual programs, with emphasis on the adequacy of both manpower resources and training capacity. The data indicate that reaching maximum staffing levels by 1977 is unlikely, although minimum levels…

  20. 40 CFR 22.26 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Proposed findings, conclusions, and order. 22.26 Section 22.26 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL CONSOLIDATED RULES OF PRACTICE GOVERNING THE ADMINISTRATIVE ASSESSMENT OF CIVIL PENALTIES AND THE REVOCATION/TERMINATION OR SUSPENSION OF PERMITS...

  1. 40 CFR 22.26 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Proposed findings, conclusions, and order. 22.26 Section 22.26 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL CONSOLIDATED RULES OF PRACTICE GOVERNING THE ADMINISTRATIVE ASSESSMENT OF CIVIL PENALTIES AND THE REVOCATION/TERMINATION OR SUSPENSION OF PERMITS...

  2. Hypothesis, Prediction, and Conclusion: Using Nature of Science Terminology Correctly

    ERIC Educational Resources Information Center

    Eastwell, Peter

    2012-01-01

    This paper defines the terms "hypothesis," "prediction," and "conclusion" and shows how to use the terms correctly in scientific investigations in both the school and science education research contexts. The scientific method, or hypothetico-deductive (HD) approach, is described and it is argued that an understanding of the scientific method,…

  3. Consultation on Higher Education and Social Justice: Statement and Conclusions

    ERIC Educational Resources Information Center

    New Frontiers in Education, 1974

    1974-01-01

    A group of 35 educators, mostly principals and teachers of colleges, met at Bangalore, India in May 1974 for a 5-day consultation on higher education's role in the promotion of social justice. The final statement and other conclusions of the Consultation are presented. (Author/PG)

  4. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 954.18 Section 954.18 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO THE DENIAL, SUSPENSION, OR REVOCATION OF PERIODICALS MAIL PRIVILEGES § 954.18 Proposed...

  5. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 954.18 Section 954.18 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO THE DENIAL, SUSPENSION, OR REVOCATION OF PERIODICALS MAIL PRIVILEGES § 954.18 Proposed...

  6. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 954.18 Section 954.18 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO THE DENIAL, SUSPENSION, OR REVOCATION OF PERIODICALS MAIL PRIVILEGES § 954.18 Proposed...

  7. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 954.18 Section 954.18 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO THE DENIAL, SUSPENSION, OR REVOCATION OF PERIODICALS MAIL PRIVILEGES § 954.18 Proposed...

  8. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 954.18 Section 954.18 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO THE DENIAL, SUSPENSION, OR REVOCATION OF PERIODICALS MAIL PRIVILEGES § 954.18 Proposed...

  9. Change-state selector installed

    SciTech Connect

    Craig, S.L.; Nolen, J.A.; Phillips, D.

    1995-08-01

    The installation and early operation of the new charge-state selector after the PII linac was described above. Previous to the use of this device all charge states of beams stripped between the PII and Booster linacs entered the Booster. The beam power of the unused charge states often caused quenching of superconducting solenoids in the Booster. This problem is completely eliminated by the charge-state selector. It also eliminates the need to use {open_quotes}guide beams{close_quotes} from the tandem when tuning heavy beams which required stripping.

  10. Automated solar collector installation design

    DOEpatents

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-08-26

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

  11. Statistical Conclusion Validity: Some Common Threats and Simple Remedies

    PubMed Central

    García-Pérez, Miguel A.

    2012-01-01

    The ultimate goal of research is to produce dependable knowledge or to provide the evidence that may guide practical decisions. Statistical conclusion validity (SCV) holds when the conclusions of a research study are founded on an adequate analysis of the data, generally meaning that adequate statistical methods are used whose small-sample behavior is accurate, besides being logically capable of providing an answer to the research question. Compared to the three other traditional aspects of research validity (external validity, internal validity, and construct validity), interest in SCV has recently grown on evidence that inadequate data analyses are sometimes carried out which yield conclusions that a proper analysis of the data would not have supported. This paper discusses evidence of three common threats to SCV that arise from widespread recommendations or practices in data analysis, namely, the use of repeated testing and optional stopping without control of Type-I error rates, the recommendation to check the assumptions of statistical tests, and the use of regression whenever a bivariate relation or the equivalence between two variables is studied. For each of these threats, examples are presented and alternative practices that safeguard SCV are discussed. Educational and editorial changes that may improve the SCV of published research are also discussed. PMID:22952465

  12. Installation package for a solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  13. Blind-Anchor-Nut-Installation Fixture (BANIF)

    NASA Technical Reports Server (NTRS)

    Willey, Norman F., Jr.; Linker, James F.

    1994-01-01

    Blind-anchor-nut-installation fixture, BANIF, developed for replacing or installing anchor nuts in blind holes or other inaccessible places. Attachment of anchor nut to BANIF enables placement of anchor nut on blind side of component.

  14. 46 CFR 182.310 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) MACHINERY INSTALLATION Auxiliary Machinery § 182.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam...

  15. Generalized measurement and conclusive teleportation with nonmaximal entanglement

    SciTech Connect

    Kim, Hyunjae; Cheong, Yong Wook; Lee, Hai-Woong

    2004-07-01

    We present linear optical schemes to perform generalized measurements for conclusive teleportation when the sender and the receiver share nonmaximal entanglement resulting from amplitude errors during propagation or generation. Three different cases are considered for which the states to be teleported are unknown superpositions of (a) single-photon and vacuum states (b) vertically polarized and horizontally polarized photon states, and (c) two coherent states of opposite phases. The generalized measurement scheme for each case is analyzed, which indicates that the success probability is much more resistant to amplitude errors for case (c) than for case (a) or (b)

  16. Tools For Installing Keys On A Stud

    NASA Technical Reports Server (NTRS)

    Goodoak, Robert D.

    1995-01-01

    Two tools designed to be used together to drive long locking keys axially to install them on stud. Tools are: supporter holding keys in correct relative alignment and driver having multiple prongs, each of which fits into one of holes in supporter. Tools prevent bending and breaking of keys during installation, and make possible to install all keys simultaneously, in one motion.

  17. Installation strength analysis of subsea flowline jumpers

    NASA Astrophysics Data System (ADS)

    Sun, Liping; Kang, Youwei

    2015-07-01

    Subsea flowline jumper (FJ) is basic connection component for the wet oil tree, the subsea pipeline and the riser base, playing an irreplaceable role in the subsea production system. During the installation of FJ, collisions often happen between FJ and other equipment, which may cause serious damage. Besides, as the operating water depth increases, the demand for the installation equipments like the crane and winch will increase. The research of deepwater FJ installation in China is still in the primary stage, so an installation method for deepwater FJ is proposed in this paper. Finite element models of a typical M-shape FJ installation system were built to simulate the installation procedures. Analysis results showed that the installation steps designed for the FJ are feasible and valid for deepwater FJ. In order to ensure the safety of the installation process, the collision-sensitive analysis for the FJ was conducted, and results show that it is necessary to set the pick up speed at a proper value, in order to avoid collision in installation process. Besides, the mechanical characteristics of FJ during the installation were investigated under a range of environmental conditions and it was found that the maximum stress of the FJ always happens at its central position. The basic requirements for the installation equipment were also obtained through the analysis of the main installation steps.

  18. Sprinkler System Installer. Occupational Analyses Series.

    ERIC Educational Resources Information Center

    Chinien, Chris; Boutin, France

    This analysis covers tasks performed by a sprinkler system installer, an occupational title some provinces and territories of Canada have also identified as pipefitter--fire protection mechanic specialty; sprinkler and fire protection installer; sprinkler and fire protection systems installer; and sprinkler fitter. A guide to analysis discusses…

  19. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Installations. 119.220 Section 119.220 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion Machinery § 119.220 Installations. (a)...

  20. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Installations. 119.310 Section 119.310 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Auxiliary Machinery § 119.310 Installations. (a)...

  1. 14 CFR 27.901 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 27.901 Section 27.901 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant General § 27.901 Installation. (a) For the purpose of this part, the powerplant installation...

  2. Fuel followed control rod installation at AFRRI

    SciTech Connect

    Moore, Mark; Owens, Chris; Forsbacka, Matt

    1992-07-01

    Fuel Followed Control Rods (FFCRs) were installed at the Armed Forces Radiobiology Research Institute's 1 MW TRIGA Reactor. The procedures for obtaining, shipping, and installing the FFCRs is described. As part of the FFCR installation, the transient rod drive was relocated. Core performance due to the addition of the fuel followed control rods is discussed. (author)

  3. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system must meet the installation...

  4. 14 CFR 27.901 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 27.901 Section 27.901 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant General § 27.901 Installation. (a) For the purpose of this part, the powerplant installation...

  5. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  6. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  7. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  8. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  9. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  10. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The requirements for machinery and boilers for steam and electrically propelled vessels are contained in...

  11. Wind profiler installed in Antarctica

    NASA Astrophysics Data System (ADS)

    Balsley, B. B.; Carey, J.; Woodman, R. F.; Sarango, M.; Urbina, J.; Rodriguez, R.; Ragaini, E.

    A VHF (50 MHz) wind profiler was installed in Antarctica at the Peruvian Base “Machu Picchu” on King George Island from January 21 to 26. The wind profiler will provide a first look at atmospheric dynamics over the region.The profiler—the first of its kind in Antarctica—is a National Science Foundationsponsored cooperative project of the University of Colorado, the Geophysical Institute of Peru, the University of Piura (Peru), and the Peruvian Navy. This venture was also greatly facilitated by Peru's Comision Nacional de Asuntos Antartidos and Consejo Nacional de Ciencias y Tecnologia, with additional logis tics support provided by the Argentinean Navy and the Uruguayan Air Force.

  12. Installing and maintaining gear pumps

    SciTech Connect

    Whitmire, K.

    1996-03-01

    While not as common as centrifugal pumps in the CPI, gear pumps play important roles in handling many of today`s more difficult-to-pump fluids. Because they operate at lower speeds -- generally, 900 rpm or less -- their seals and bearings tend to last longer than those of centrifugal models. In addition, unlike centrifugal pumps, gear pumps` flows are independent of their systems` pressure curves, and they can handle a wider range of viscosities. Although high-flow, low-head applications remain the domain of centrifugal pumps, the use of gear pumps is increasing in the chemical process industries (CPI). While some application boundaries between gears and centrifugals are blurring, there are some crucial differences between the way the two are operated and maintained -- for example, where pressure relief is concerned. This article provides a general summary of gear pump characteristics and applications, highlighting critical aspects of installation, operation and maintenance.

  13. Parenteral trace element provision: recent clinical research and practical conclusions.

    PubMed

    Stehle, P; Stoffel-Wagner, B; Kuhn, K S

    2016-08-01

    The aim of this systematic review (PubMed, www.ncbi.nlm.nih.gov/pubmed and Cochrane, www.cochrane.org; last entry 31 December 2014) was to present data from recent clinical studies investigating parenteral trace element provision in adult patients and to draw conclusions for clinical practice. Important physiological functions in human metabolism are known for nine trace elements: selenium, zinc, copper, manganese, chromium, iron, molybdenum, iodine and fluoride. Lack of, or an insufficient supply of, these trace elements in nutrition therapy over a prolonged period is associated with trace element deprivation, which may lead to a deterioration of existing clinical symptoms and/or the development of characteristic malnutrition syndromes. Therefore, all parenteral nutrition prescriptions should include a daily dose of trace elements. To avoid trace element deprivation or imbalances, physiological doses are recommended. PMID:27049031

  14. Conclusive quantum steering with superconducting transition edge sensors

    NASA Astrophysics Data System (ADS)

    de Almeida, Marcelo P.; Smith, Devin H.; Gillett, Geo; Branciard, Cyril; Fedrizzi, Alessandro; Weinhold, Till J.; Lita, Adriana; Calkins, Brice; Gertis, Thomas; Nam, Sae Woo; White, Andrew G.

    2012-02-01

    Quantum steering allows two parties to verify shared entanglement even if one measurement device is untrusted. A conclusive demonstration of steering through the violation of a steering inequality is of considerable fundamental interest and opens up applications in quantum communication. To date all experimental tests with single photon states have relied on post-selection, allowing untrusted devices to cheat by hiding unfavorable events in losses. Here we close this ``detection loophole'' by combining a highly efficient source of entangled photon pairs with superconducting transition edge sensors. We achieve an unprecedented ˜62% conditional detection efficiency of entangled photons and violate a steering inequality with the minimal number of measurement settings by 48 standard deviations. Our results provide a clear path to practical applications of steering and to a photonic loophole-free Bell test.

  15. Conclusive quantum steering with superconducting transition-edge sensors

    NASA Astrophysics Data System (ADS)

    Smith, Devin H.; Gillett, Geoff; de Almeida, Marcelo P.; Branciard, Cyril; Fedrizzi, Alessandro; Weinhold, Till J.; Lita, Adriana; Calkins, Brice; Gerrits, Thomas; Wiseman, Howard M.; Nam, Sae Woo; White, Andrew G.

    2012-01-01

    Quantum steering allows two parties to verify shared entanglement even if one measurement device is untrusted. A conclusive demonstration of steering through the violation of a steering inequality is of considerable fundamental interest and opens up applications in quantum communication. To date, all experimental tests with single-photon states have relied on post selection, allowing untrusted devices to cheat by hiding unfavourable events in losses. Here we close this 'detection loophole' by combining a highly efficient source of entangled photon pairs with superconducting transition-edge sensors. We achieve an unprecedented ~62% conditional detection efficiency of entangled photons and violate a steering inequality with the minimal number of measurement settings by 48 s.d.s. Our results provide a clear path to practical applications of steering and to a photonic loophole-free Bell test.

  16. Differences between evolution of Titan's and Earth's rivers - further conclusions

    NASA Astrophysics Data System (ADS)

    Misiura, Katarzyna; Czechowski, Leszek

    2014-05-01

    Titan is the only celestial body, beside the Earth, where liquid is present on the surface. Liquid forms a number of lakes and rivers. In our research we use numerical model of the river to determine differences of evolution of rivers on the Earth and on Titan. We have found that transport of sediments on Titan is more effective than on Earth for the same river geometry and discharge. We have found also the theoretical explanations for this conclusion. 2.Introduction Titan is a very special body in the Solar System. It is the only moon that has dense atmosphere and flowing liquid on its surface. The Cassini-Huygens mission has found on Titan meandering rivers, and indicated processes of erosion, transport of solid material and its sedimentation. This paper is aimed to investigate the similarity and differences between these processes on Titan and the Earth. 3. Basic equations of our model The dynamical analysis of the considered rivers is performed using the package CCHE modified for the specific conditions on Titan. The package is based on the Navier-Stokes equations for depth-integrated two dimensional, turbulent flow and three dimensional convection-diffusion equation of sediment transport. 4. Parameters of the model We considered our model for a few kinds of liquid found on Titan. The liquid that falls as a rain (75% methane, 25% nitrogen) has different properties than the fluid forming lakes (74% ethane, 10% methane, 7% propane, 8.5% butane, 0.5% nitrogen). Other parameters of our model are: inflow discharge, outflow level, grain size of sediments etc. For every calculation performed for Titan's river similar calculations are performed for terrestrial ones. 5. Results and Conclusions The results of our simulation show the differences in behaviour of the flow and of sedimentation on Titan and on the Earth. Our preliminary results indicate that transport of material by Titan's rivers is more efficient than by terrestrial rivers of the same geometry parameters

  17. Scale decisions can reverse conclusions on community assembly processes

    PubMed Central

    Münkemüller, Tamara; Gallien, Laure; Lavergne, Sébastien; Renaud, Julien; Roquet, Cristina; Abdulhak, Sylvain; Dullinger, Stefan; Garraud, Luc; Guisan, Antoine; Lenoir, Jonathan; Svenning, Jens-Christian; Van Es, Jérémie; Vittoz, Pascal; Willner, Wolfgang; Wohlgemuth, Thomas; Zimmermann, Niklaus E.; Thuiller, Wilfried

    2014-01-01

    Aim Phylogenetic diversity patterns are increasingly being used to better understand the role of ecological and evolutionary processes in community assembly. Here, we quantify how these patterns are influenced by scale choices in terms of spatial and environmental extent and organismic scales. Location European Alps. Methods We applied 42 sampling strategies differing in their combination of focal scales. For each resulting sub-dataset, we estimated the phylogenetic diversity of the species pools, phylogenetic α-diversities of local communities, and statistics commonly used together with null models in order to infer non-random diversity patterns (i.e. phylogenetic clustering versus over-dispersion). Finally, we studied the effects of scale choices on these measures using regression analyses. Results Scale choices were decisive for revealing signals in diversity patterns. Notably, changes in focal scales sometimes reversed a pattern of over-dispersion into clustering. Organismic scale had a stronger effect than spatial and environmental extent. However, we did not find general rules for the direction of change from over-dispersion to clustering with changing scales. Importantly, these scale issues had only a weak influence when focusing on regional diversity patterns that change along abiotic gradients. Main conclusions Our results call for caution when combining phylogenetic data with distributional data to study how and why communities differ from random expectations of phylogenetic relatedness. These analyses seem to be robust when the focus is on relating community diversity patterns to variation in habitat conditions, such as abiotic gradients. However, if the focus is on identifying relevant assembly rules for local communities, the uncertainty arising from a certain scale choice can be immense. In the latter case, it becomes necessary to test whether emerging patterns are robust to alternative scale choices. PMID:24791149

  18. Comparative environmental assessment of unconventional power installations

    NASA Astrophysics Data System (ADS)

    Sosnina, E. N.; Masleeva, O. V.; Kryukov, E. V.

    2015-08-01

    Procedure of the strategic environmental assessment of the power installations operating on the basis of renewable energy sources (RES) was developed and described. This procedure takes into account not only the operational process of the power installation but also the whole life cycles: from the production and distribution of power resources for manufacturing of the power installations to the process of their recovery. Such an approach gives an opportunity to make a more comprehensive assessment of the influence of the power installations on environments and may be used during adaptation of the current regulations and development of new regulations for application of different types of unconventional power installations with due account of the ecological factor. Application of the procedure of the integrated environmental assessment in the context of mini-HPP (Hydro Power Plant); wind, solar, and biogas power installations; and traditional power installation operating natural gas was considered. Comparison of environmental influence revealed advantages of new energy technologies compared to traditional ones. It is shown that solar energy installations hardly pollute the environment during operation, but the negative influence of the mining operations and manufacturing and utilization of the materials used for solar modules is maximum. Biogas power installations are on the second place as concerns the impact on the environment due to the considerable mass of the biogas installation and gas reciprocating engine. The minimum impact on the environment is exerted by the mini-HPP. Consumption of material and energy resources for the production of the traditional power installation is less compared to power installations on RES; however, this factor incomparably increases when taking into account the fuel extraction and transfer. The greatest impact on the environment is exerted by the operational process of the traditional power installations.

  19. Spectroscopy of asteroid pairs - new observations support previous conclusions

    NASA Astrophysics Data System (ADS)

    Polishook, David; Oszkiewicz, Dagmara Anna; None Kwiatkowski, Tomasz

    2015-08-01

    Asteroid pairs were split due to fast rotation of a strengthless body. Study them can reveal fundamental principles in asteroid interiors and evolution. We continue our spectroscopic survey of asteroid pairs in the near-IR range (IRTF) and work on completing the spectral coverage in the visible wavelength (SALT, NOT).Our new observations support our previous conclusions (Polishook et al. 2014):1. Primary and secondary members have very similar reflectance spectra supporting the claim that every pair originated from a single progenitor. We measured 2 more pairs that present the same taxonomy (4905-7813, 15107-291188). This increases to 22 the number of asteroid pairs with spectral similarities and supports the claim of a single progenitor for each pair to a significance of over 5 sigma.2. Rotational fission is not a function of the asteroid composition rather the asteroid’s structure. We present new reflectance spectra of S- and C-complex pairs that differ in their composition.3. Some asteroid pairs present spectral parameters that imply a fresh, non-weathered surface. This includes spectral slope, and a deep and wide absorption band at 1 micron. Among these, the asteroid 8306 can now be re-classified as a Q-type asteroid, a common class in the near-Earth environment, but rare in the main belt. 8306 is the 4th Q-type discovered within asteroid pairs (all locate in the main belt).4. A secondary member of an asteroid pair composed of ordinary chondrite (S-complex) might present a reflectance spectrum with lower spectral slope compared to its primary member. This is seen in the new measured reflectance spectrum of secondary 291188). This result supports the theory of Jacobson & Scheeres (2011) of continuous disintegration of the secondaries while still in the vicinity of their primaries.5. With time, the fresh surface becomes weathered. Dynamical calculations limit the disintegration time of the progenitor of the pair 4905-7813 to 1.65 millions years ago, what makes

  20. Cosmological Gamma-Ray Bursts and Hypernovae Conclusively Linked

    NASA Astrophysics Data System (ADS)

    2003-06-01

    Clearest-Ever Evidence from VLT Spectra of Powerful Event Summary A very bright burst of gamma-rays was observed on March 29, 2003 by NASA's High Energy Transient Explorer (HETE-II) , in a sky region within the constellation Leo. Within 90 min, a new, very bright light source (the "optical afterglow") was detected in the same direction by means of a 40-inch telescope at the Siding Spring Observatory (Australia) and also in Japan. The gamma-ray burst was designated GRB 030329 , according to the date. And within 24 hours, a first, very detailed spectrum of this new object was obtained by the UVES high-dispersion spectrograph on the 8.2-m VLT KUEYEN telescope at the ESO Paranal Observatory (Chile). It allowed to determine the distance as about 2,650 million light-years (redshift 0.1685). Continued observations with the FORS1 and FORS2 multi-mode instruments on the VLT during the following month allowed an international team of astronomers [1] to document in unprecedented detail the changes in the spectrum of the optical afterglow of this gamma-ray burst . Their detailed report appears in the June 19 issue of the research journal "Nature". The spectra show the gradual and clear emergence of a supernova spectrum of the most energetic class known, a "hypernova" . This is caused by the explosion of a very heavy star - presumably over 25 times heavier than the Sun. The measured expansion velocity (in excess of 30,000 km/sec) and the total energy released were exceptionally high, even within the elect hypernova class. From a comparison with more nearby hypernovae, the astronomers are able to fix with good accuracy the moment of the stellar explosion. It turns out to be within an interval of plus/minus two days of the gamma-ray burst. This unique conclusion provides compelling evidence that the two events are directly connected. These observations therefore indicate a common physical process behind the hypernova explosion and the associated emission of strong gamma

  1. Installation package for air flat plate collector

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Solar 2 dimensions are four feet by eight feet by two and one half inches. The collector weighs 130 pounds and has an effective solar collection area of over 29.5 square feet. This area represents 95 percent of the total surface of the collector. The installation, operation and maintenance manual, safety hazard analysis, special handling instructions, materials list, installation concept drawings, warranty and certification statement are included in the installation package.

  2. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... requirements for machinery and boilers for steam and electrically propelled vessels are contained in applicable... propulsion machinery include: (1) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic...

  3. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... requirements for machinery and boilers for steam and electrically propelled vessels are contained in applicable... propulsion machinery include: (1) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic...

  4. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... requirements for machinery and boilers for steam and electrically propelled vessels are contained in applicable... propulsion machinery include: (1) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic...

  5. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... requirements for machinery and boilers for steam and electrically propelled vessels are contained in applicable... propulsion machinery include: (1) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic...

  6. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a...

  7. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a...

  8. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a...

  9. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a...

  10. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Radiotelephone installations. 183.392 Section 183.392 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392...

  11. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  12. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  13. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  14. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  15. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  16. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Surfaces § 23.655 Installation. (a)...

  17. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Installations. 119.310 Section 119.310 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION...

  18. Installation package for the Solaron solar subsystem

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  19. Specification and installation of a MILNET host

    SciTech Connect

    George, M.

    1986-04-01

    A MILNET host computer was specified and installed to meet the needs of the growing user community at Sandia. The configuration of this host is described from specification through installation and testing. Also included are descriptions of the MILNET network and administrative procedures for the system. 5 figs.

  20. 14 CFR 29.901 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 29.901 Section 29.901 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant General § 29.901 Installation. (a) For the purpose of this part, the powerplant...

  1. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  2. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  3. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  4. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  5. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  6. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads for main and booster fans, and air ducts connecting main fans to underground openings shall...

  7. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads for main and booster fans, and air ducts connecting main fans to underground openings shall...

  8. 14 CFR 29.901 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 29.901 Section 29.901 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant General § 29.901 Installation. (a) For the purpose of this part, the powerplant...

  9. 46 CFR 132.220 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 132.220 Section 132.220 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS FIRE-PROTECTION EQUIPMENT Portable and Semiportable Fire Extinguishers § 132.220 Installation. (a) Each portable fire extinguisher approved under subpart 162.028 of this...

  10. 14 CFR 171.9 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.9 Section 171.9 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VOR Facilities § 171.9 Installation requirements....

  11. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Utility installations. 817.180 Section 817.180 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations....

  12. Installing a propulsion system in the HSCT

    SciTech Connect

    Gilkey, S.C.; Hines, R.H.; Shaw, R.J.

    1995-08-01

    This article reports on the development of an advanced propulsion system for the High Speed Civil Transport aircraft. The topics of the article include a review of the need for supersonic transport, the design mission and requirements, installed system performance including impact of intake and exhaust nozzle configuration, installed system noise, maintainability and safety, and future tests.

  13. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  14. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  15. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  16. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  17. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  18. FIELD STUDIES OF GEOMEMBRANE INSTALLATION TECHNIQUES

    EPA Science Inventory

    Fourteen construction sites where geomembranes were being installed were visited to observe subgrade preparation and liner installation techniques. These sites were visited during a study conducted for the U.S. EPA, Solid and Hazardous Waste Research Division. The sites included ...

  19. 30 CFR 816.180 - Utility installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Utility installations. 816.180 Section 816.180 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-SURFACE MINING ACTIVITIES § 816.180 Utility installations. All...

  20. 30 CFR 816.180 - Utility installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Utility installations. 816.180 Section 816.180 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... § 816.180 Utility installations. All surface coal mining operations shall be conducted in a manner...

  1. Advances in methods for deepwater TLP installations

    SciTech Connect

    Wybro, P.G.

    1995-10-01

    This paper describes a method suitable for installing deepwater TLP structures in water depths beyond 3,000 ft. An overview is presented of previous TLP installation, wherein an evaluation is made of the various methods and their suitability to deepwater applications. A novel method for installation of deepwater TLP`s is described. This method of installation is most suitable for deepwater and/or large TLP structures, but can also be used in moderate water depth as well. The tendon installation method utilizes the so-called Platform Arrestor Concept (PAC), wherein tendon sections are transported by barges to site, and assembled vertically using a dynamically position crane vessel. The tendons are transferred to the platform where they are hung off until there are a full complement of tendons. The hull lock off operation is performed on all tendons simultaneously, avoiding dangerous platform resonant behavior. The installation calls for relatively simple installation equipment, and also enables the use of simple tendon tie-off equipment, such as a single piece nut.

  2. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    SciTech Connect

    Richards, Elizabeth H.; Schindel, Kay; Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William; Harper, Alan

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  3. Structural Code Considerations for Solar Rooftop Installations.

    SciTech Connect

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  4. FORCAST Camera Installed on SOFIA Telescope

    NASA Video Gallery

    Cornell University's Faint Object Infrared Camera for the SOFIA Telescope, or FORCAST, being installed on the Stratospheric Observatory for Infrared Astronomy's 2.5-meter telescope in preparation f...

  5. Prototype solar-heating system - installation manual

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Manual for prototype solar-heating system gives detailed installation procedures for each of seven subsystems. Procedures for operation and maintenance are also included. It discusses architectural considerations, building construction considerations, and checkout-test procedures.

  6. Installing Portable Classrooms With Good Air Quality.

    ERIC Educational Resources Information Center

    Godfrey, Ray

    2000-01-01

    Discusses the advantages of modular classrooms and improvements made in indoor air quality, including the pros and cons of portables, challenges districts face when planning and installing portables, and cost considerations. Concluding comments highlight system costs and maintenance required. (GR)

  7. Space Station Live: Installing the AMS

    NASA Video Gallery

    PAO Officer Kyle Herring interviews NASA astronaut Mike Fincke about his contribution during STS-134, the shuttle mission that installed the Alpha Magnetic Spectrometer (AMS) in May 2011. As a miss...

  8. Riser, pipelines installed in Griffin field

    SciTech Connect

    Not Available

    1994-05-23

    A mooring riser and flow lines along with a 67-km, 8-in., gas-export pipelines have been installed offshore Australia for BHP Petroleum's Griffin field development. The 66-km gas line will carry Griffin field gas to an onshore gas-processing plant. Completing the projects ahead of schedule was Clough Stena Joint Venture (Asia), Perth. BHP awarded the contracts in early 1993; the project was completed in January this year. The paper describes the contractor, pipeline installation, and handling equipment.

  9. Software Management Environment (SME) installation guide

    NASA Technical Reports Server (NTRS)

    Kistler, David; Jeletic, Kellyann

    1992-01-01

    This document contains installation information for the Software Management Environment (SME), developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides a list of hardware and software requirements as well as detailed installation instructions and trouble-shooting information.

  10. Nacap installs Norway's first land lines

    SciTech Connect

    Not Available

    1984-08-01

    Norway's first gas pipeline on land - forming a part of the Statpipe gas gathering, transportation, and treatment system - is currently being installed by Nacap BV under extremely unusual conditions, both in terms of terrain to be crossed and safety standards to be adhered to. Nacap is constructing the 12 mile long twin pipeline of 30 in. and 28 in. diameters, two-thirds of which run under three deep fjords. Special construction techniques used for installing the pipeline are described.

  11. Methods for protecting subsea pipelines and installations

    SciTech Connect

    Rochelle, W.R.; Simpson, D.M.

    1981-01-01

    The hazards for subsea pipelines and installations are described. Methods currently being used to protect subsea pipelines and installations are discussed with the emphasis on various trenching methods and equipment. Technical data on progress rates for trenching and feasible depths of trench are given. Possible methods for protection against icebergs are discussed. A case for more comprehensive data on icebergs is presented. Should a pipeline become damaged, repair methods are noted.

  12. Improving Energy Security for Air Force Installations

    NASA Astrophysics Data System (ADS)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  13. Solar system installation at Louisville, Kentucky

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  14. Fluid assisted installation of electrical cable accessories

    DOEpatents

    Mayer, Robert W.; Silva, Frank A.

    1977-01-01

    An electrical cable accessory includes a generally tubular member of elastomeric material which is to be installed by placement over a cylindrical surface to grip the cylindrical surface, when in appropriate assembled relation therewith, with a predetermined gripping force established by dilation of the tubular member, the installation being facilitated by introducing fluid under pressure, through means provided in the tubular member, between the tubular member and the cylindrical surface, and simultaneously impeding the escape of the fluid under pressure from between the tubular member and the cylindrical surface by means adjacent one of the ends of the tubular member to cause dilation of the tubular member and establish a fluid layer between the tubular member and the cylindrical surface, thereby reducing the gripping force during installation.

  15. Risk assessment Barter Island radar installation, Alaska

    SciTech Connect

    1995-05-05

    This document contains the baseline human health risk assessment and the ecological risk assessment (ERA) for the Barter Island Distant Early Warning (DEW) Line radar installation. Fourteen sites at the Barter Island radar installation underwent remedial investigations (RIS) during the summer of 1993. The presence of chemical contamination in the soil, sediments, and surface water at the installation was evaluated and reported in the Barter Island Remedial Investigation/Feasibility Study (RI/FS) United States Air Force 1994a. The analytical data reported in the RI/FS form the basis for the human health and ecological risk assessment. The primary contaminants of concern at the 14 sites are diesel and gasoline from past spills and/or leaks. The general location of the Barter Island radar installation is shown in Figure 1-1. The 14 sites investigated and the types of samples collected at each site are presented in Table 1-1. The purpose of the risk assessment is to evaluate the human and ecological health risks that may be associated with chemicals released to the environment at the 14 sites investigated during the RIs. The risk assessment characterizes the probability that measured concentrations of hazardous chemical substances will cause adverse effects in humans or the environment in the absence of remediation. The risk assessment will be used to determine if remediation (site cleanup) is necessary and also to rank sites for remedial action. Additionally, it will be used as a model for the risk assessment to be performed at the other DEW Line installations (Bullen Point, Oliktok Point, Point Lonely, Barrow Point, Wainwright, and Point Lay) and the Cape Lisburne radar installation. pg18. JMD.

  16. Solar heating system installed at Troy, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  17. Inflatable device for installing strain gage bridges

    NASA Technical Reports Server (NTRS)

    Cook, C. E.; Smith, G. E.; Monaghan, R. C. (Inventor)

    1983-01-01

    Methods and devices for installing in a tubular shaft multiple strain gages are disclosed with focus on a method and a device for pneumatically forcing strain gages into seated engagement with the internal surfaces of a tubular shaft in an installation of multiple strain gages in a tubular shaft. The strain gages or other electron devices are seated in a template-like component which is wrapped about a pneumatically expansible body. The component is inserted into a shaft and the body is pneumatically expanded after a suitable adhesive was applied to the surfaces.

  18. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC

    SciTech Connect

    Not Available

    1980-09-01

    Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

  19. Installation package - SIMS prototype system 1A

    NASA Technical Reports Server (NTRS)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  20. Door Hardware and Installations; Carpentry: 901894.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course designed to provide instruction in the selection, preparation, and installation of hardware for door assemblies. The course is divided into five blocks of instruction (introduction to doors and hardware, door hardware, exterior doors and jambs, interior doors and jambs, and a quinmester post-test) totaling…

  1. Solar Energy Installers Curriculum Guides. Final Report.

    ERIC Educational Resources Information Center

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  2. Public Address Systems. Specifications - Installation - Operation.

    ERIC Educational Resources Information Center

    Palmer, Fred M.

    Provisions for public address in new construction of campus buildings (specifications, installations, and operation of public address systems), are discussed in non-technical terms. Consideration is given to microphones, amplifiers, loudspeakers and the placement and operation of various different combinations. (FS)

  3. Standard hydrogen monitoring system equipment installation instructions

    SciTech Connect

    Schneider, T.C.

    1996-09-27

    This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

  4. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system... of IEEE 45-2002 (incorporated by reference; see 46 CFR 110.10-1); or (b) IEC 92-304 (incorporated by reference; see 46 CFR 110.10-1)....

  5. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system... of IEEE 45-2002 (incorporated by reference; see 46 CFR 110.10-1); or (b) IEC 92-304 (incorporated by reference; see 46 CFR 110.10-1)....

  6. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system... of IEEE 45-2002 (incorporated by reference; see 46 CFR 110.10-1); or (b) IEC 92-304 (incorporated by reference; see 46 CFR 110.10-1)....

  7. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system... of IEEE 45-2002 (incorporated by reference; see 46 CFR 110.10-1); or (b) IEC 60092-304 (incorporated by reference; see 46 CFR 110.10-1)....

  8. 14 CFR 171.271 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.271 Section 171.271 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing System...

  9. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  10. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  11. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  12. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  13. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  14. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  15. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  16. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  17. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  18. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  19. UIUC control console installation and upgrade

    SciTech Connect

    Holm, Richard L.

    1994-07-01

    The University of Illinois Nuclear Reactor Laboratory shutdown in March of 1993 to install the General Atomics digital control console. Two weeks of this period were devoted to refurbishment of the rod drives and two weeks were the actual installation of the console. Much of the wiring necessary to install the console was done during the period when the rod drives were being refurbished. A few mistakes were made along the way. 1) A 'repaired' extension cord was temporarily used to supply power to the DAC... the ground and neutral were reversed... this was not appreciated by the DAC{exclamation_point} We had to replace a couple of the boards in the DAC after that little fiasco. 2) The instrumentation cables for the rod drives were received with the plugs all connected and ready to install... except you can't put a two inch plug through a half inch conduit. We had to cut the plugs off, run the cable through the conduit, and then resolder the plugs on where the rod drive assembly connects (my privilege). 3) We had to replace the memory board in the NM1000 in order to prevent it from losing its mind every time it got turned off. 4) There were problems with the pulse data acquisition that were eventually traced to a problem in the ribbon cable between the mother and daughter boards. All in all the installation and operation of the console went fairly well. There are still occasional glitches, but none serious or excessively annoying. The console installation is part of an upgrade program to replace all of the instrumentation in the facility with the modern equivalent. The pressure and flow sensors, currently air operated, are being replaced with 4-20 ma transmitters for input into the control console and into a mimic board for the primary and secondary systems. Through the funding of the now defunct, temporarily we hope, Reactor Instrumentation Program we have upgraded our area radiation monitors as well. These upgrades provide us with more reliable equipment as well as

  20. Analysis of heat pumps installed in family housing at Hunter Army Air Field

    SciTech Connect

    Parker, S.A.

    1994-08-01

    The US Army Forces Command (FORSCOM) tasked Pacific Northwest Laboratory (PNL) in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) to conduct a postconstruction evaluation of the air-source heat pumps installed in family housing at Hunter Army Air Field (AAF). The objective of this project was to investigate and resolve concerns about an increase in energy costs at Hunter AAF following the installation of heat pumps in November 1992. After completing several analyses and a field inspection of the heat pumps in family housing at Hunter AAF, the following conclusions were made: the installation of air-source heat pumps reduced the annual energy cost in family housing by $46,672 in 1993; the heat pump thermostat controls in Hunter AAF family housing appear to be incorrectly installed; and the Hunter AAF electric utility bill increased 10% during the first 6 months of 1993 compared to the first 6 months of 1992.

  1. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary...

  2. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary...

  3. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary...

  4. 47 CFR 1.30003 - Installations on an AM antenna.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Installations on an AM antenna. 1.30003 Section... Random Selection Disturbance of AM Broadcast Station Antenna Patterns § 1.30003 Installations on an AM antenna. (a) Installations on a nondirectional AM tower. When antennas are installed on a...

  5. 46 CFR 105.25-10 - Cargo pumping installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Cargo pumping installation. 105.25-10 Section 105.25-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS... Installed Below Decks § 105.25-10 Cargo pumping installation. (a) Cargo pumps shall not be installed in...

  6. 24 CFR 3286.107 - Installation in accordance with standards.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... does not comply with the installation standards. (3) All installation work must be in conformance with... workmanship reflecting, at a minimum, journeyman quality of work of the various trades. (4) Except as set out in paragraph (a)(2) of this section, all installation defects due to the work of the installer...

  7. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section...

  8. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2013-10-01 2013-10-01 false Diesel engine installations. 58.10-10 Section...

  9. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2011-10-01 2011-10-01 false Diesel engine installations. 58.10-10 Section...

  10. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2014-10-01 2014-10-01 false Diesel engine installations. 58.10-10 Section...

  11. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2012-10-01 2012-10-01 false Diesel engine installations. 58.10-10 Section...

  12. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for...

  13. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for...

  14. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for...

  15. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for...

  16. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for...

  17. 46 CFR 32.45-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Installation and details. 32.45-1 Section 32.45-1... REQUIREMENTS Electrical Installations § 32.45-1 Installation and details. The installation of all electrical engineering or interior communications systems, together with the details of design, construction,...

  18. 24 CFR 3286.107 - Installation in accordance with standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... does not comply with the installation standards. (3) All installation work must be in conformance with... workmanship reflecting, at a minimum, journeyman quality of work of the various trades. (4) Except as set out... requirements of this subpart B must be installed in accordance with: (i) An installation design...

  19. Reliability in power conditioners/battery installation

    SciTech Connect

    O`Sullivan, G.A.

    1995-07-01

    Both availability and maintainability are enhanced for multi-megawatt battery storage installations if modular design is employed. A module is defined as an inverter/battery charger and an array of battery cells. The designer has several trade offs to consider for the number of cells in series and the size of each inverter/battery charger. Fault tolerant system designs allow for the limited life expectancy of battery cells and produce reliable systems. The selection of ten or more modules operating in load sharing and redundancy is an order of magnitude more reliable than a single module rated for the total capacity of an installation. Frequent testing will assure the proper functional status of redundant modules. Inverters that serve as Ac current sources and are phase locked to the utility voltage and frequency provide simplicity and reliability. A current source inverter reacts quickly to loss of utility voltage and has other noteworthy safety embellishments.

  20. TMS installation at A-1 Test Stand

    NASA Technical Reports Server (NTRS)

    2010-01-01

    Employees at NASA's John C. Stennis Space Center complete installation of the new thrust measurement system on the A-1 Test Stand. The new TMS is a state-of-the-art upgrade from the previous system, which was installed when the testing structure was built in the 1960s. It is an advanced calibration system capable of measuring vertical and horizontal thrust loads with accuracy within 0.15 percent at 225,000 pounds. It also will allow engineers to measure thrust as they gimbal (or tilt) engines during tests. The new TMS is part of upgrades for the A-1 Test Stand in preparation for testing the next generation of American space program rocket engines.

  1. Static Frequency Converter System Installed and Tested

    NASA Technical Reports Server (NTRS)

    Brown, Donald P.; Sadhukhan, Debashis

    2003-01-01

    A new Static Frequency Converter (SFC) system has been installed and tested at the NASA Glenn Research Center s Central Air Equipment Building to provide consistent, reduced motor start times and improved reliability for the building s 14 large exhausters and compressors. The operational start times have been consistent around 2 min, 20 s per machine. This is at least a 3-min improvement (per machine) over the old variable-frequency motor generator sets. The SFC was designed and built by Asea Brown Boveri (ABB) and installed by Encompass Design Group (EDG) as part of a Construction of Facilities project managed by Glenn (Robert Scheidegger, project manager). The authors designed the Central Process Distributed Control Systems interface and control between the programmable logic controller, solid-state exciter, and switchgear, which was constructed by Gilcrest Electric.

  2. Installation of a Roof Mounted Photovoltaic System

    NASA Astrophysics Data System (ADS)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  3. Installation of electric generators on turbine engines

    NASA Technical Reports Server (NTRS)

    Demel, H. F.

    1983-01-01

    The installation of generators on turbine aircraft is discussed. Emphasis is placed on the use of the samarium cobalt generator. Potential advantages of an electric secondary power system at the engine level are listed. The integrated generator and the externally mounted generator are discussed. It is concluded that the integrated generator is best used in turbojet and low bypass ratio engines where there is no easy way of placing generators externally without influencing frontal areas.

  4. Solar heating system installed at Stamford, Connecticut

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.

  5. TMS installation at A-1 Test Stand

    NASA Technical Reports Server (NTRS)

    2010-01-01

    Stennis Space Center employees maneuver a new thrust measurement system in preparation for its installation on the A-1 Test Stand on March 3. The system was fabricated by Thrust Measurement Systems in Illinois and represents a state-of-the-art upgrade from the equipment used on the stand for more than 40 years. The A-1 Test Stand is being upgraded to provide testing for the next generation of rocket engines for America's space program.

  6. Blind Fastener Is Easy To Install

    NASA Technical Reports Server (NTRS)

    Peterson, S. A.

    1982-01-01

    Panels, sheets, doors and other structures could be easily attached to and removed from mating part by proposed new fastener. Fastener is permanently anchored in removable part only. Its protruding end is inserted into a hole in mating part. When wedge pin is screwed tightly closed, segmented collar contracts or expands to release parts or to grip them. Installation has no loose parts, and no rear nut is needed.

  7. TMS installation at A-1 Test Stand

    NASA Technical Reports Server (NTRS)

    2010-01-01

    A new thrust measurement system is lifted onto the A-1 Test Stand deck at NASA's John C. Stennis Space Center in preparation for its installation. The new system is a state-of-the-art upgrade for the testing structure, which is being prepared for testing of next-generation rocket engines. The system was fabricated by Thrust Measurement Systems in Illinois at a cost of about $3.5 million.

  8. Extra-Territorial Siting of Nuclear Installations

    SciTech Connect

    Shea, Thomas E.; Morris, Frederic A.

    2009-10-07

    Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

  9. Installation for producing radiographic layer images

    SciTech Connect

    Kinanen, I.

    1984-11-06

    The purpose of the invention is to create a mechanically uncomplicated installation for producing radiographic layer images, making it possible to use small radiation dosages and, however, to collect sufficiently information on the object by one exposure, whereby separation of the superimposed layers from each other in a desired way for visualization can be accomplished by means of tomosynthesis. The installation includes radiation generating means collimating means for confining the radiation and focusing it on an object to be radiographed, e.g. a patient, means for detecting the radiation passed through the object and means for storing and processing the information contained in said detection. Said collimating means comprise a collimation unit including at least two separate, narrow, contiguous, substantially parallel collimating slots for producing narrow, fan-shaped beams, said slots being arranged preferably in alignment with the longitudinal axis of the object to be radiographed. The installation also includes means for displacing said collimating slots and the object to be radiographed in relation to each other at least substantially in alignment with the normal of said collimating slots, those parts of the object selected to be radiographed being arranged to be exposed to radiation by said narrow fan-shaped beams from a number of different directions. The information obtained from the object to be radiographed is stored preferably in digital form and processed for visualization.

  10. A General Purpose High Performance Linux Installation Infrastructure

    SciTech Connect

    Wachsmann, Alf

    2002-06-17

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation.

  11. Cost effective TLP installation methods and tendon top connectors

    SciTech Connect

    Wybro, P.G.; Chaison, M.

    1995-05-01

    This paper describes a novel TLP tendon top connector and motion arrest system. The top connector and motion arrest system is inherently linked to the method used to install the platform, and methods for platform installation are described. This method of installation is most suitable for deepwater and/or large TLP structures, but can also be used in moderate water depth as well. The tendon installation method utilizes the so-called Platform Arrestor Concept (PAC). The installation is procedurally not complex and calls for relatively simple installation equipment, and also enables the use of simple tendon tie-off equipment, such as a single piece nut. The tendons can be pre-installed to the foundation prior to platform arrival, or can be co-installed, i.e., installed while the platform is on location.

  12. 39 CFR 953.11 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings of fact and conclusions of law... PROCEEDINGS RELATIVE TO MAILABILITY § 953.11 Proposed findings of fact and conclusions of law. Proposed findings of fact and conclusions of law shall be submitted orally or in writing at the conclusion of...

  13. 39 CFR 953.11 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings of fact and conclusions of law... PROCEEDINGS RELATIVE TO MAILABILITY § 953.11 Proposed findings of fact and conclusions of law. Proposed findings of fact and conclusions of law shall be submitted orally or in writing at the conclusion of...

  14. 39 CFR 953.11 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings of fact and conclusions of law... PROCEEDINGS RELATIVE TO MAILABILITY § 953.11 Proposed findings of fact and conclusions of law. Proposed findings of fact and conclusions of law shall be submitted orally or in writing at the conclusion of...

  15. 39 CFR 953.11 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings of fact and conclusions of law... PROCEEDINGS RELATIVE TO MAILABILITY § 953.11 Proposed findings of fact and conclusions of law. Proposed findings of fact and conclusions of law shall be submitted orally or in writing at the conclusion of...

  16. 39 CFR 953.11 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings of fact and conclusions of law... PROCEEDINGS RELATIVE TO MAILABILITY § 953.11 Proposed findings of fact and conclusions of law. Proposed findings of fact and conclusions of law shall be submitted orally or in writing at the conclusion of...

  17. A NEW RUSSIAN WASTE MANAGEMENT INSTALLATION

    SciTech Connect

    Griffith, Andrew; Engxy, Thor; Endregard, Monica; Schwab, Patrick; Nazarian, Ashot; Krumrine, Paul; Backe, Steinar; Gorin, Stephen; Evans, Brent

    2003-02-27

    The Polyarninsky Shipyard (sometimes called Navy Yard No. 10 or the Shkval Shipyard) has been designated as the recipient for Solid Radioactive Waste (SRW) management facilities under the Arctic Military Environmental Cooperation (AMEC) Program. The existing SRW storage site at this shipyard is filled to capacity, which is forcing the shipyard to reduce its submarine dismantlement activities. The Polyarninsky Shipyard Waste Management Installation is planned as a combination of several AMEC projects. It will have several elements, including a set of hydraulic metal cutting tools, containers for transport and storage, the Mobile Pretreatment Facility (MPF) for Solid Radioactive Waste, the PICASSO system for radiation monitoring, and a Waste Storage Facility. Hydraulically operated cutting tools can cut many metal items via shearing so that dusts or particulates are not generated. The AMEC Program procured a cutting tool system, consisting of a motor and hydraulic pumping unit, a 38-mm conduit-cutting tool, a 100- mm pipe-cutting tool, and a spreading tool all mounted on a wheeled cart. The vendor modified the tool system for extremely cold conditions and Russian electrical standards, then delivered the tool system to the Polyarninsky shipyard. A new container for transportation and storage of SRW and been designed and fabricated. The first 400 of these containers have been delivered to the Northern Fleet of the Russian Navy for use at the Polyarninsky Shipyard Waste Management Installation. These containers are cylindrical in shape and can hold seven standard 200-liter drums. They are the first containers ever certified in Russia for the offsite transport of military SRW. These containers can be transported by truck, rail, barge, or ship. The MPF will be the focal point of the Polyarninsky Shipyard Waste Management Installation and a key element in meeting the nuclear submarine dismantlement and waste processing needs of the Russian Federation. It will receive raw

  18. The Installation Restoration Program toxicology guide

    SciTech Connect

    Lu, Po-Yung.

    1990-11-01

    One of the objectives of the US Air Force Installation Restoration Program (IRP) is to provide individuals responsible for the management and implementation of the IRP with information to evaluate the health hazards associated with actual or potential contamination of drinking water supplies. For each chemical in the IRP Toxicology Guide, the environmental fate, exposure pathways, toxicity, sampling and analysis methods and state and federal regulatory status are outlined. The material provided is intended as an overview of key topic areas; no attempt was made to provide a comprehensive review. The Air Force IRP Toxicology Guide is an effort by the Harry G. Armstrong Aerospace Research Laboratory to identify those contaminants for which criteria, standards or US EPA-based guidelines are available provide a ground water contaminant information data base for use at USAF installations where there are no relevant federal, state, or local standards, and provide guidelines to aid in the development of USAF policy and program for IRP completion. This volume, regarding identified by the USAF as being of concern to the IRP, is an extension of the previous four volumes addressing a series of 70 compounds relevant to Air Force installations. Specifically, this volume presents information on cadmium, chromium, mercury, zinc, arsenic, nickel and copper. The general organization is similar to that of the previous volumes, and consists of individual chapters for each metal. Due to the complexity of metal chemistry, each chapter is not limited to merely the elemental form of the metal, but rather information on various metal compounds. 140 refs., 5 figs., 10 tabs.

  19. First MAGDAS installation at Fayum in Egypt

    NASA Astrophysics Data System (ADS)

    Mahrous, A.; Ghamry, E.; Elhawary, R.; Fathy, I.; Yamazaki, Y.; Abe, S.; Uozumi, T.; Yumoto, K.

    2010-09-01

    We have installed the first MAGDAS magnetometer at Fayum in Egypt. The ambient temperature in the initial sensor house varied more than ±4 °C in one day (24 h period). This variation made the magnetic data useless. To correct this problem, (1) a new sensor house was re-constructed which reduced the diurnal variation to less than ±1 °C, and (2) the "Uozumi Temperature Correction Method" was introduced. As a result, good data is now arriving in real time at a central facility in Japan.

  20. Method of installing sub-sea templates

    SciTech Connect

    Hampton, J.E.

    1984-03-06

    A subsea template is installed by a method which includes the steps of securing the template in a position beneath the deck of a semi-submersible drilling vessel, moving the semi-submersible drilling vessel to an appropriate offshore site and subsequently lowering the template from the semi-submersible to the sea bed. In addition, at least three anchorage templates may be loaded onto one or both of the pontoons of the semi-submersible drilling vessel at its original position and are subsequently lowered from the pontoons to their respective locations on the sea bed after the semi-submersible has moved to the offshore site.

  1. Performance of Installed Cooking Exhaust Devices

    SciTech Connect

    Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

    2011-11-01

    The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) – including exhaust fan/microwave combination appliances – were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

  2. Drum ring removal/installation tool

    DOEpatents

    Andrade, William Andrew

    2006-11-14

    A handheld tool, or a pair of such tools, such as for use in removing/installing a bolt-type clamping ring on a container barrel/drum, where the clamping ring has a pair of clamping ends each with a throughbore. Each tool has an elongated handle and an elongated lever arm transversely connected to one end of the handle. The lever arm is capable of being inserted into the throughbore of a selected clamping end and leveraged with the handle to exert a first moment on the selected clamping end. Each tool also has a second lever arm, such as a socket with an open-ended slot, which is suspended alongside the first lever arm. The second lever arm is capable of engaging the selected clamping end and being leveraged with the handle to exert a second moment which is orthogonal to the first moment. In this manner, the first and second moments operate to hold the selected clamping end fixed relative to the tool so that the selected clamping end may be controlled with the handle. The pair of clamping ends may also be simultaneously and independently controlled with the use of two handles/tools so as to contort the geometry of the drum clamping ring and enable its removal/installation.

  3. Assembling and Installing LRUs for NIF

    SciTech Connect

    Bonanno, R E

    2003-12-31

    Within the 192 National Ignition Facility (NIF) beamlines, there are over 7000 large (40 x 40 cm) optical components, including laser glass, mirrors, lenses, and polarizers. These optics are held in large opto-mechanical assemblies called line-replaceable units (LRUs). Each LRU has strict specifications with respect to cleanliness, alignment, and wavefront so that once activated, each NIF beamline will meet its performance requirements. NIF LRUs are assembled, tested, and refurbished in on-site cleanroom facilities. The assembled LRUs weigh up to 1800 kilograms, and are about the size of a phone booth. They are transported in portable clean canisters and inserted into the NIF beampath using robotic transporters. This plug and play design allows LRUs to be easily removed from the beampath for maintenance or upgrades. Commissioning of the first NIF quad, an activity known as NIF Early Light (NEL), has validated LRU designs and architecture, as well as demonstrated that LRUs can be assembled and installed as designed. Furthermore, it has served to develop key processes and tools forming the foundation for NIF s long-term LRU production and maintenance strategy. As we look forward to building out the rest of NIF, the challenge lies in scaling up the production rate while maintaining quality, implementing process improvements, and fully leveraging the learning and experience gained from NEL. This paper provides an overview of the facilities, equipment and processes used to assemble and install LRUs in NIF.

  4. Multilateral installation from a floating rig

    SciTech Connect

    1998-07-01

    The Troll Olje gas province is approximately 100 km northwest of Bergen, Norway, in the Norwegian sector of the North Sea at a water depth of approximately 315 to 340 m. Troll Olje is part of the Troll gas field, where Norsk Hydro is responsible for developing two areas with thin oil rims. Before spudding the multilateral well described in this paper, 17 wells had been drilled and completed in the Troll Olje oil province. The multilateral-well concept was introduced in the gas province primarily to increase the drainage area for each well. When producing from two separate laterals, a lower drawdown pressure exists throughout the horizontal section. Therefore, gas coning is less likely to occur, and higher production rates can be sustained for a longer period of time. In addition, cost savings are substantial because of reduced well-construction time for each horizontal reservoir-drainage section and because of the reduced number of completion strings, subsea wellheads, and pipelines required for total field development. The full-length paper details design, development, testing, and installation of the first successful multilateral well installed from a floating rig offshore Norway. The paper gives a synopsis.

  5. Installation of an innovative remedial technology

    SciTech Connect

    Hines, B.

    1995-12-31

    The major goal of the Lasagna{trademark} project was to design, construct, install, and operate an in situ remediation system in low-permeability soil. A new technology--the Lasagna process--uses electro-osmosis to move contaminated groundwater through treatment zones. The treatment zones are installed in contaminated soils, thereby forming an integrated in situ remedial process. Electro-osmosis, well known for its effectiveness and extremely low power consumption, uses a direct current to cause Groundwater to travel through low-permeability soil. When a bench-scale version of the technology was 98 percent effective in removing contamination, an actual field test was the next step. The site chosen for this first field effort was the DOE-owned Paducah Gaseous Diffusion Plant located in Paducah, Kentucky. The target contaminant for this project was trichloroethylene (TCE) because it is found at many sites across the country and is present at approximately 60 percent of DOE`s sites.

  6. Air leakage of newly instaled residential windows

    SciTech Connect

    Weidt, J.; Weidt, J.

    1980-06-01

    The air-leakage characteristics of five major window designs were measured in a field survey conducted in Twin Cities, Minnesota. A total of 192 windows (16 manufacturers) were tested at 58 sites representing a cross-section of single-family homes, townhouses, low- and high-rise apartments, and condominiums. Air-leakage measurements of the installed windows were compared with the current standard used by industry and government of 0.50 ft/sup 3//min/linear ft of crack. Other parameters studied were: effect of sash and frame material, effect of leakage between window frame and wall, differences among the product lines of a single manufacturer and between manufacturers, effect of installation practices, effect of cold weather on performance, change in performance over time for older windows, and performance of fixed glazing. Based on industry and government standards, 40% of all windows tested showed air-leakage characteristics higher than the 0.50 cfm/lfc standard, and 60% exceeded manufacturers' specifications for performance which in some cases were lower than the general industry standard. Analysis of the impact of various parameters on air-leakage performance showed that the operational design of the window was the most critical determinant although the ranking changes if performance is expressed in cfm/unit area or cfm/opening area. Air leakage was measured using a portable pressurization chamber. Smoke pencils, thermographic techniques and extensive photographic documentation provided additional data as to the location and cause of air leakage problems.

  7. Energy Integrated Dairy Farm digester and cogeneration system installation

    SciTech Connect

    Ross, C.C.; Walsh, J.L.

    1984-01-01

    Georgia Tech finished in December, 1983 Phase II (system installation and startup) of its four year Energy Integrated Dairy Farm System (EIDFS) program. This paper outlines the selection and installation of the anaerobic digestion and cogeneration components of the EIDFS.

  8. 30 CFR 75.516-1 - Installed insulators.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... insulators. Well-insulated insulators is interpreted to mean well-installed insulators. Insulated J-hooks may be used to suspend insulated power cables for temporary installation not exceeding 6 months and...

  9. 30 CFR 75.516-1 - Installed insulators.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... insulators. Well-insulated insulators is interpreted to mean well-installed insulators. Insulated J-hooks may be used to suspend insulated power cables for temporary installation not exceeding 6 months and...

  10. 30 CFR 75.516-1 - Installed insulators.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... insulators. Well-insulated insulators is interpreted to mean well-installed insulators. Insulated J-hooks may be used to suspend insulated power cables for temporary installation not exceeding 6 months and...

  11. 30 CFR 75.516-1 - Installed insulators.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... insulators. Well-insulated insulators is interpreted to mean well-installed insulators. Insulated J-hooks may be used to suspend insulated power cables for temporary installation not exceeding 6 months and...

  12. Design and installation package for a solar powered pump

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  13. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification...

  14. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification...

  15. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification...

  16. 26 CFR 300.1 - Installment agreement fee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Installment agreement fee. 300.1 Section 300.1... ADMINISTRATION USER FEES § 300.1 Installment agreement fee. (a) Applicability. This section applies to installment agreements under section 6159 of the Internal Revenue Code. (b) Fee. The fee for entering into...

  17. 7 CFR 766.58 - Installment to be set aside.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Installment to be set aside. 766.58 Section 766.58... AGRICULTURE SPECIAL PROGRAMS DIRECT LOAN SERVICING-SPECIAL Disaster Set-Aside § 766.58 Installment to be set aside. (a) The Agency will set-aside the first installment due immediately after the disaster...

  18. 30 CFR 77.202 - Dust accumulations in surface installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Dust accumulations in surface installations. 77.202 Section 77.202 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.202 Dust accumulations in surface installations. Coal...

  19. 46 CFR 118.520 - Installation and location.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Installation and location. 118.520 Section 118.520... EQUIPMENT Portable Fire Extinguishers § 118.520 Installation and location. Portable fire extinguishers must.... The installation and location must be to the satisfaction of the cognizant OCMI....

  20. 46 CFR 181.520 - Installation and location.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Installation and location. 181.520 Section 181.520... TONS) FIRE PROTECTION EQUIPMENT Portable Fire Extinguishers § 181.520 Installation and location... the space being protected. The installation and location must be to the satisfaction of the Officer...

  1. 46 CFR 181.520 - Installation and location.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation and location. 181.520 Section 181.520... TONS) FIRE PROTECTION EQUIPMENT Portable Fire Extinguishers § 181.520 Installation and location... the space being protected. The installation and location must be to the satisfaction of the Officer...

  2. 46 CFR 118.520 - Installation and location.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Installation and location. 118.520 Section 118.520... EQUIPMENT Portable Fire Extinguishers § 118.520 Installation and location. Portable fire extinguishers must.... The installation and location must be to the satisfaction of the cognizant OCMI....

  3. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded...

  4. 32 CFR 634.25 - Installation traffic codes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Installation traffic codes. 634.25 Section 634.25 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation...

  5. 32 CFR 634.25 - Installation traffic codes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Installation traffic codes. 634.25 Section 634.25 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation...

  6. 32 CFR 634.25 - Installation traffic codes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes. 634.25 Section 634.25... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activity commanders will establish a traffic code for operation of...

  7. 32 CFR 634.25 - Installation traffic codes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Installation traffic codes. 634.25 Section 634.25... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activity commanders will establish a traffic code for operation of...

  8. 32 CFR 634.25 - Installation traffic codes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Installation traffic codes. 634.25 Section 634.25... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activity commanders will establish a traffic code for operation of...

  9. 46 CFR 76.25-35 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.25-35 Section 76.25-35 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-35 Operation and installation. (a) The system shall be so arranged and installed that a fire...

  10. 32 CFR 636.11 - Installation traffic codes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Installation traffic codes. 636.11 Section 636... ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort Stewart, Georgia § 636.11 Installation traffic codes. In addition to the requirements in § 634.25(d)...

  11. 32 CFR 636.11 - Installation traffic codes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Installation traffic codes. 636.11 Section 636.11... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort Stewart, Georgia § 636.11 Installation traffic codes. In addition to the requirements in § 634.25(d) of this...

  12. 32 CFR 636.11 - Installation traffic codes

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Installation traffic codes 636.11 Section 636.11... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort Stewart, Georgia § 636.11 Installation traffic codes In addition to the requirements in § 634.25(d) of this...

  13. 46 CFR 56.50-96 - Keel cooler installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Keel cooler installations. 56.50-96 Section 56.50-96 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Design Requirements Pertaining to Specific Systems § 56.50-96 Keel cooler installations. (a) Keel cooler installations shall meet...

  14. 46 CFR 56.50-96 - Keel cooler installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Keel cooler installations. 56.50-96 Section 56.50-96 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Design Requirements Pertaining to Specific Systems § 56.50-96 Keel cooler installations. (a) Keel cooler installations shall meet...

  15. 46 CFR 56.50-96 - Keel cooler installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Keel cooler installations. 56.50-96 Section 56.50-96 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Design Requirements Pertaining to Specific Systems § 56.50-96 Keel cooler installations. (a) Keel cooler installations shall meet...

  16. 46 CFR 56.50-96 - Keel cooler installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Keel cooler installations. 56.50-96 Section 56.50-96 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Design Requirements Pertaining to Specific Systems § 56.50-96 Keel cooler installations. (a) Keel cooler installations shall meet...

  17. 46 CFR 56.50-96 - Keel cooler installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Keel cooler installations. 56.50-96 Section 56.50-96 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Design Requirements Pertaining to Specific Systems § 56.50-96 Keel cooler installations. (a) Keel cooler installations shall meet...

  18. 46 CFR 195.03-1 - Installation and details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Installation and details. 195.03-1 Section 195.03-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 195.03-1 Installation and details. (a) The installation of all systems...

  19. 46 CFR 195.03-1 - Installation and details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Installation and details. 195.03-1 Section 195.03-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 195.03-1 Installation and details. (a) The installation of all systems...

  20. 46 CFR 118.520 - Installation and location.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Installation and location. 118.520 Section 118.520... EQUIPMENT Portable Fire Extinguishers § 118.520 Installation and location. Portable fire extinguishers must.... The installation and location must be to the satisfaction of the cognizant OCMI....

  1. 46 CFR 119.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... prevent backflow of water from reaching engine exhaust ports under normal conditions. (d) Pipes used...

  2. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  3. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  4. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  5. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  6. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  7. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  8. 46 CFR 119.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... prevent backflow of water from reaching engine exhaust ports under normal conditions. (d) Pipes used...

  9. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  10. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  11. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  12. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  13. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  14. 46 CFR 119.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... prevent backflow of water from reaching engine exhaust ports under normal conditions. (d) Pipes used...

  15. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  16. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  17. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  18. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  19. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  20. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  1. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  2. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  3. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  4. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  5. Installation package for a sunspot cascade solar water heating system

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  6. 7 CFR 1403.6 - Collection by installment payments.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Collection by installment payments. 1403.6 Section 1403.6 Agriculture Regulations of the Department of Agriculture (Continued) COMMODITY CREDIT... PROCEDURES § 1403.6 Collection by installment payments. (a) Payments in installments may be arranged, at...

  7. 7 CFR 1403.6 - Collection by installment payments.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Collection by installment payments. 1403.6 Section 1403.6 Agriculture Regulations of the Department of Agriculture (Continued) COMMODITY CREDIT... PROCEDURES § 1403.6 Collection by installment payments. (a) Payments in installments may be arranged, at...

  8. 7 CFR 1403.6 - Collection by installment payments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Collection by installment payments. 1403.6 Section 1403.6 Agriculture Regulations of the Department of Agriculture (Continued) COMMODITY CREDIT... PROCEDURES § 1403.6 Collection by installment payments. (a) Payments in installments may be arranged, at...

  9. 7 CFR 1403.6 - Collection by installment payments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Collection by installment payments. 1403.6 Section 1403.6 Agriculture Regulations of the Department of Agriculture (Continued) COMMODITY CREDIT... PROCEDURES § 1403.6 Collection by installment payments. (a) Payments in installments may be arranged, at...

  10. 7 CFR 1403.6 - Collection by installment payments.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Collection by installment payments. 1403.6 Section 1403.6 Agriculture Regulations of the Department of Agriculture (Continued) COMMODITY CREDIT... PROCEDURES § 1403.6 Collection by installment payments. (a) Payments in installments may be arranged, at...

  11. 24 CFR 3285.501 - Home installation manual supplements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features...

  12. 49 CFR 192.383 - Excess flow valve installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Excess flow valve installation. 192.383 Section..., and Service Lines § 192.383 Excess flow valve installation. (a) Definitions. As used in this section... serves only one single-family residence. (b) Installation required. An excess flow valve...

  13. 49 CFR 192.383 - Excess flow valve installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Excess flow valve installation. 192.383 Section..., and Service Lines § 192.383 Excess flow valve installation. (a) Definitions. As used in this section... serves only one single-family residence. (b) Installation required. An excess flow valve...

  14. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  15. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  16. 30 CFR 77.206 - Ladders; construction; installation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OF UNDERGROUND COAL MINES Surface Installations § 77.206 Ladders; construction; installation and maintenance. (a) Ladders shall be of substantial construction and maintained in good condition. (b) Wooden... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Ladders; construction; installation...

  17. 30 CFR 77.206 - Ladders; construction; installation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OF UNDERGROUND COAL MINES Surface Installations § 77.206 Ladders; construction; installation and maintenance. (a) Ladders shall be of substantial construction and maintained in good condition. (b) Wooden... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Ladders; construction; installation...

  18. 45 CFR 2532.10 - Military Installation Conversion Demonstration programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to...) Fully utilize military installations affected by closures or realignments; (3) Encourage...

  19. 45 CFR 2532.10 - Military Installation Conversion Demonstration programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to...) Fully utilize military installations affected by closures or realignments; (3) Encourage...

  20. 45 CFR 2532.10 - Military Installation Conversion Demonstration programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to...) Fully utilize military installations affected by closures or realignments; (3) Encourage...

  1. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  2. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations... reference, see 46 CFR 58.03-1). (b) Materials. The materials used for gas turbine installations shall have... submitted to substantiate their suitability and safety for the service intended: (1) Combustion chamber....

  3. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  4. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations... reference, see 46 CFR 58.03-1). (b) Materials. The materials used for gas turbine installations shall have... submitted to substantiate their suitability and safety for the service intended: (1) Combustion chamber....

  5. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  6. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  7. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations... reference, see 46 CFR 58.03-1). (b) Materials. The materials used for gas turbine installations shall have... submitted to substantiate their suitability and safety for the service intended: (1) Combustion chamber....

  8. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations... reference, see 46 CFR 58.03-1). (b) Materials. The materials used for gas turbine installations shall have... submitted to substantiate their suitability and safety for the service intended: (1) Combustion chamber....

  9. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  10. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations... reference, see 46 CFR 58.03-1). (b) Materials. The materials used for gas turbine installations shall have... submitted to substantiate their suitability and safety for the service intended: (1) Combustion chamber....

  11. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The...

  12. 30 CFR 77.511 - Danger signs at electrical installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Danger signs at electrical installations. 77... UNDERGROUND COAL MINES Electrical Equipment-General § 77.511 Danger signs at electrical installations. Suitable danger signs shall be posted at all major electrical installations....

  13. 30 CFR 77.511 - Danger signs at electrical installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Danger signs at electrical installations. 77... UNDERGROUND COAL MINES Electrical Equipment-General § 77.511 Danger signs at electrical installations. Suitable danger signs shall be posted at all major electrical installations....

  14. 30 CFR 77.511 - Danger signs at electrical installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Danger signs at electrical installations. 77... UNDERGROUND COAL MINES Electrical Equipment-General § 77.511 Danger signs at electrical installations. Suitable danger signs shall be posted at all major electrical installations....

  15. 30 CFR 77.511 - Danger signs at electrical installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Danger signs at electrical installations. 77... UNDERGROUND COAL MINES Electrical Equipment-General § 77.511 Danger signs at electrical installations. Suitable danger signs shall be posted at all major electrical installations....

  16. 30 CFR 77.511 - Danger signs at electrical installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Danger signs at electrical installations. 77... UNDERGROUND COAL MINES Electrical Equipment-General § 77.511 Danger signs at electrical installations. Suitable danger signs shall be posted at all major electrical installations....

  17. 32 CFR 809a.1 - Random installation entry point checks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Random installation entry point checks. 809a.1... Entry Policy § 809a.1 Random installation entry point checks. The installation commander determines when, where, and how to implement random checks of vehicles or pedestrians. The commander conducts...

  18. UDS Recovery Equipment Installation (AFCI CETE Milestone Report)

    SciTech Connect

    Jubin, Robert Thomas

    2009-06-01

    This letter documents the successful installation of the un-dissolved solids (UDS) recovery equipment into the hot-cell in building 7920 at ORNL. This installation (see Figure 1) satisfies the AFCI Level 4 milestone in the CETE Investments and Hot Cell Upgrades work package (OR0915020323) to 'Complete UDS recovery equipment installation' (M4502032306), due 30 June 09.

  19. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  20. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  1. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  2. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  3. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Methane content in surface installations. 77... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The...

  4. 30 CFR 77.200 - Surface installations; general.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Surface installations; general. 77.200 Section... AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.200 Surface installations; general. All mine structures, enclosures,...

  5. 30 CFR 77.200 - Surface installations; general.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Surface installations; general. 77.200 Section... AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.200 Surface installations; general. All mine structures, enclosures,...

  6. 30 CFR 77.202 - Dust accumulations in surface installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Dust accumulations in surface installations. 77... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.202 Dust accumulations in surface installations. Coal...

  7. 30 CFR 77.205 - Travelways at surface installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Travelways at surface installations. 77.205... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.205 Travelways at surface installations. (a) Safe means of...

  8. 30 CFR 77.205 - Travelways at surface installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Travelways at surface installations. 77.205... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.205 Travelways at surface installations. (a) Safe means of...

  9. 30 CFR 77.204 - Openings in surface installations; safeguards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Openings in surface installations; safeguards. 77.204 Section 77.204 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... UNDERGROUND COAL MINES Surface Installations § 77.204 Openings in surface installations; safeguards....

  10. 30 CFR 77.204 - Openings in surface installations; safeguards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Openings in surface installations; safeguards. 77.204 Section 77.204 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... UNDERGROUND COAL MINES Surface Installations § 77.204 Openings in surface installations; safeguards....

  11. 45 CFR 2532.10 - Military Installation Conversion Demonstration programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to...) Fully utilize military installations affected by closures or realignments; (3) Encourage...

  12. 45 CFR 2532.10 - Military Installation Conversion Demonstration programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to...) Fully utilize military installations affected by closures or realignments; (3) Encourage...

  13. Canberra Alpha Sentry Installation Functional Design Criteria (FDC)

    SciTech Connect

    WHITE, W.F.

    1999-12-16

    This document provides the functional design criteria for the installation of the Canberra Alpha Sentry System at selected locations within the Plutonium Finishing Plant (PFP). The equipment being installed is identified by part number in Section 3 and the locations are given in Section 5. The design, procurement and installation are assigned to Fluor Federal Services.

  14. 24 CFR 3285.501 - Home installation manual supplements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features...

  15. 24 CFR 3285.501 - Home installation manual supplements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features...

  16. 24 CFR 3285.501 - Home installation manual supplements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features...

  17. 46 CFR 58.20-15 - Installation of refrigerating machinery.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Installation of refrigerating machinery. 58.20-15... AND AUXILIARY MACHINERY AND RELATED SYSTEMS Refrigeration Machinery § 58.20-15 Installation of refrigerating machinery. (a) Where refrigerating machines are installed in which anhydrous ammonia is used as...

  18. 32 CFR 809a.1 - Random installation entry point checks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Random installation entry point checks. 809a.1 Section 809a.1 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE... Entry Policy § 809a.1 Random installation entry point checks. The installation commander determines...

  19. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  20. 46 CFR 119.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... prevent backflow of water from reaching engine exhaust ports under normal conditions. (d) Pipes used...

  1. 10 CFR 2.1209 - Findings of fact and conclusions of law.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... conclusions of law. Each party shall file written post-hearing proposed findings of fact and conclusions of law on the contentions addressed in an oral hearing under § 2.1207 or a written hearing under § 2.1208... 10 Energy 1 2010-01-01 2010-01-01 false Findings of fact and conclusions of law. 2.1209 Section...

  2. 20 CFR 725.417 - Action at the conclusion of conference.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Action at the conclusion of conference. 725... § 725.417 Action at the conclusion of conference. (a) At the conclusion of a conference, the district....414. The district director may also notify additional operators of their potential liability...

  3. 20 CFR 725.417 - Action at the conclusion of conference.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 4 2012-04-01 2012-04-01 false Action at the conclusion of conference. 725... § 725.417 Action at the conclusion of conference. (a) At the conclusion of a conference, the district....414. The district director may also notify additional operators of their potential liability...

  4. 20 CFR 725.417 - Action at the conclusion of conference.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false Action at the conclusion of conference. 725... § 725.417 Action at the conclusion of conference. (a) At the conclusion of a conference, the district....414. The district director may also notify additional operators of their potential liability...

  5. 20 CFR 725.417 - Action at the conclusion of conference.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 4 2013-04-01 2013-04-01 false Action at the conclusion of conference. 725... § 725.417 Action at the conclusion of conference. (a) At the conclusion of a conference, the district....414. The district director may also notify additional operators of their potential liability...

  6. 20 CFR 725.417 - Action at the conclusion of conference.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Action at the conclusion of conference. 725... § 725.417 Action at the conclusion of conference. (a) At the conclusion of a conference, the district....414. The district director may also notify additional operators of their potential liability...

  7. 39 CFR 964.14 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings of fact and conclusions of law... findings of fact and conclusions of law. (a) Each party to a proceeding, except one who fails to answer the..., submit proposed findings of fact, conclusions of law, orders and supporting reasons either in oral...

  8. 10 CFR 2.1209 - Findings of fact and conclusions of law.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Findings of fact and conclusions of law. 2.1209 Section 2... Procedures for NRC Adjudications § 2.1209 Findings of fact and conclusions of law. Each party shall file written post-hearing proposed findings of fact and conclusions of law on the contentions addressed in...

  9. 30 CFR 44.31 - Proposed findings of fact, conclusions, and orders.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Proposed findings of fact, conclusions, and... MANDATORY SAFETY STANDARDS Hearings § 44.31 Proposed findings of fact, conclusions, and orders. After... each party may file proposed findings of fact, conclusions of law, and rule or order, together with...

  10. 39 CFR 964.14 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings of fact and conclusions of law... findings of fact and conclusions of law. (a) Each party to a proceeding, except one who fails to answer the..., submit proposed findings of fact, conclusions of law, orders and supporting reasons either in oral...

  11. 43 CFR 4.842 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Proposed findings of fact and conclusions... Posthearing Procedures § 4.842 Proposed findings of fact and conclusions of law. Within 30 days after the... of fact and conclusions of law together with supporting briefs. Such proposals and briefs shall...

  12. 30 CFR 44.31 - Proposed findings of fact, conclusions, and orders.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Proposed findings of fact, conclusions, and... MANDATORY SAFETY STANDARDS Hearings § 44.31 Proposed findings of fact, conclusions, and orders. After... each party may file proposed findings of fact, conclusions of law, and rule or order, together with...

  13. 30 CFR 44.31 - Proposed findings of fact, conclusions, and orders.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Proposed findings of fact, conclusions, and... MANDATORY SAFETY STANDARDS Hearings § 44.31 Proposed findings of fact, conclusions, and orders. After... each party may file proposed findings of fact, conclusions of law, and rule or order, together with...

  14. 43 CFR 4.842 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Proposed findings of fact and conclusions... Posthearing Procedures § 4.842 Proposed findings of fact and conclusions of law. Within 30 days after the... of fact and conclusions of law together with supporting briefs. Such proposals and briefs shall...

  15. 49 CFR 386.57 - Proposed findings of fact, conclusions of law.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Proposed findings of fact, conclusions of law. 386... HAZARDOUS MATERIALS PROCEEDINGS General Rules and Hearings § 386.57 Proposed findings of fact, conclusions... proposed findings of fact, conclusions of law, and supportng reasons therefor. If the administrative...

  16. 30 CFR 44.31 - Proposed findings of fact, conclusions, and orders.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Proposed findings of fact, conclusions, and... MANDATORY SAFETY STANDARDS Hearings § 44.31 Proposed findings of fact, conclusions, and orders. After... each party may file proposed findings of fact, conclusions of law, and rule or order, together with...

  17. 49 CFR 386.57 - Proposed findings of fact, conclusions of law.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Proposed findings of fact, conclusions of law. 386... HAZARDOUS MATERIALS PROCEEDINGS General Rules and Hearings § 386.57 Proposed findings of fact, conclusions... proposed findings of fact, conclusions of law, and supporting reasons therefor. If the administrative...

  18. 39 CFR 963.17 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings of fact and conclusions of law... findings of fact and conclusions of law. (a) Each party who participates in the hearing may, unless the presiding officer orders otherwise, submit proposed findings of fact, conclusions of law, orders,...

  19. 39 CFR 963.17 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings of fact and conclusions of law... findings of fact and conclusions of law. (a) Each party who participates in the hearing may, unless the presiding officer orders otherwise, submit proposed findings of fact, conclusions of law, orders,...

  20. 49 CFR 386.57 - Proposed findings of fact, conclusions of law.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Proposed findings of fact, conclusions of law. 386... HAZARDOUS MATERIALS PROCEEDINGS General Rules and Hearings § 386.57 Proposed findings of fact, conclusions... proposed findings of fact, conclusions of law, and supporting reasons therefor. If the administrative...

  1. 43 CFR 4.842 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Proposed findings of fact and conclusions... Posthearing Procedures § 4.842 Proposed findings of fact and conclusions of law. Within 30 days after the... of fact and conclusions of law together with supporting briefs. Such proposals and briefs shall...

  2. 39 CFR 964.14 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings of fact and conclusions of law... findings of fact and conclusions of law. (a) Each party to a proceeding, except one who fails to answer the..., submit proposed findings of fact, conclusions of law, orders and supporting reasons either in oral...

  3. 49 CFR 386.57 - Proposed findings of fact, conclusions of law.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Proposed findings of fact, conclusions of law. 386... HAZARDOUS MATERIALS PROCEEDINGS General Rules and Hearings § 386.57 Proposed findings of fact, conclusions... proposed findings of fact, conclusions of law, and supporting reasons therefor. If the administrative...

  4. 10 CFR 2.1209 - Findings of fact and conclusions of law.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Findings of fact and conclusions of law. 2.1209 Section 2... ISSUANCE OF ORDERS Informal Hearing Procedures for NRC Adjudications § 2.1209 Findings of fact and conclusions of law. Each party shall file written post-hearing proposed findings of fact and conclusions...

  5. 39 CFR 963.17 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings of fact and conclusions of law... findings of fact and conclusions of law. (a) Each party who participates in the hearing may, unless the presiding officer orders otherwise, submit proposed findings of fact, conclusions of law, orders,...

  6. 49 CFR 386.57 - Proposed findings of fact, conclusions of law.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Proposed findings of fact, conclusions of law. 386... HAZARDOUS MATERIALS PROCEEDINGS General Rules and Hearings § 386.57 Proposed findings of fact, conclusions... proposed findings of fact, conclusions of law, and supportng reasons therefor. If the administrative...

  7. 43 CFR 4.842 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Proposed findings of fact and conclusions... Posthearing Procedures § 4.842 Proposed findings of fact and conclusions of law. Within 30 days after the... of fact and conclusions of law together with supporting briefs. Such proposals and briefs shall...

  8. 10 CFR 2.1209 - Findings of fact and conclusions of law.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Findings of fact and conclusions of law. 2.1209 Section 2... ISSUANCE OF ORDERS Informal Hearing Procedures for NRC Adjudications § 2.1209 Findings of fact and conclusions of law. Each party shall file written post-hearing proposed findings of fact and conclusions...

  9. 10 CFR 2.1209 - Findings of fact and conclusions of law.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Findings of fact and conclusions of law. 2.1209 Section 2... Procedures for NRC Adjudications § 2.1209 Findings of fact and conclusions of law. Each party shall file written post-hearing proposed findings of fact and conclusions of law on the contentions addressed in...

  10. 43 CFR 4.842 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Proposed findings of fact and conclusions... Posthearing Procedures § 4.842 Proposed findings of fact and conclusions of law. Within 30 days after the... of fact and conclusions of law together with supporting briefs. Such proposals and briefs shall...

  11. 30 CFR 44.31 - Proposed findings of fact, conclusions, and orders.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Proposed findings of fact, conclusions, and... MANDATORY SAFETY STANDARDS Hearings § 44.31 Proposed findings of fact, conclusions, and orders. After... each party may file proposed findings of fact, conclusions of law, and rule or order, together with...

  12. 78 FR 45104 - Model Manufactured Home Installation Standards: Ground Anchor Installations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... Manufactured Home Installation Standards final rule, which was published on October 19, 2007 (72 FR 59338... displacement limits or the load at failure of the anchoring equipment or its attachment point to the testing... stable ground reference point for displacement measurements must be located independent of the...

  13. Skin: an interactive hyperstereoscopic electro installation

    NASA Astrophysics Data System (ADS)

    Kostis, Helen-Nicole; Kooima, Robert; Kannenberg, John

    2007-02-01

    It is the uniqueness of Virtual Reality as a medium that calls for the creation of hybrid realities which blur the finite boundaries between physical and digital existence. Virtual Reality's distinguishing features as an artistic medium embody a distinct form of aesthetics: it is a stereoscopic, immersive, interactive, performative, dynamic, and experiential medium. A Virtual Reality art piece manifests in multiple ways. It can present itself as an interactive virtual archetype, exploring concepts rendered from different perspectives, and as an impetus to challenge the platform's capabilities, not only theoretically as an artistic practice, but also by calling for the instantiation of authoring tools for the development of virtual reality experiences. The paradigm presented in this paper is a Virtual Reality art piece, called skin, 2006, developed on Electro, which is an open-source cross-platform development environment. skin, 2006, is an interactive hypersteroscopic high-definition audiovisual installation that explores a dialogue between physical and digital senses of "touch".

  14. Support systems for mineral mining installations

    SciTech Connect

    Tengler, J.; Von Viebahn, H.E.

    1980-03-11

    A mineral mining installation has a longwall scraper-chain conveyor with a machine, such as a plough, guided for movement back and forth alongside the conveyor to win mineral from a longwall face. A roof support system which may be arranged at the ends of the longwall working, i.e., at the so-called stable zones , is composed of several units each with hydraulic props protected within cylindrical telescopic casings. Each support unit may be displaceable as a whole to follow the working progress or else each support unit may be constructed with front and rear frame assemblies which are relatively displaceable. Each support unit has at least five narrow elongate roof bars disposed closely side-by-side in parallelism. The roof bars are guided for longitudinal advancement and hydraulic rams serve to advance the roof bars individually or in groups. A similar arrangement may also be employed as the floor structure of each support unit.

  15. Acoustical analysis capability for pusher propeller installations

    NASA Astrophysics Data System (ADS)

    Weir, Donald S.; Marsan, Mehmet; Lyon, Craig

    1990-01-01

    A new capability to predict the noise from pusher propeller installations has been developed. The pylon flowfield is modeled by potential flow theory for the outer solution and boundary layer theory for the inner solution. This flowfield is added to the performance prediction for a propeller contained in the NASA Aircraft Noise Prediction Program (ANOPP). Predictions of the noise are made using Farassat's method in the ANOPP Subsonic Propeller Noise Module. Comparisons of the predictions are made with noise data from a model scale SR-2 propeller in both tractor and pusher configurations taken in the NASA Langley Research Center Quiet Flow Facility. The results show good agreement near the plane of the propeller, but the quality of the agreement decreases toward the propeller axis.

  16. CATS landline installed beneath the river Tees

    SciTech Connect

    Not Available

    1992-08-01

    Press Construction Ltd. has completed installation of the land portion of a new gas pipeline from the North Sea, including a tunnel beneath the River Tees in the north of England. The work was carried out under a multi-million dollar contract from Amoco (UK) Exploration Co. The pipeline is the land portion of the Central Area Transmission System. The 4.6-mile, 36-in. onshore pipeline connects a valve station at the CATS landfall at Coatham Sands, just south of Tees Bay, to a gas terminal north of the River Tees. This paper reports on the entire CATS system which runs for nearly 250 miles from a riser platform in the Central Graben area of the North Sea to the Coatham Sands landfall and then overland to the gas terminal. The gas will fuel a new combined heat-and-power generating plant on Teesside, currently under construction by Teesside Power.

  17. Case studies of six high priority DOD installations

    SciTech Connect

    1994-11-01

    This is a supplement to the report entitled Environmental Cleanup: Too Many High Priority Sites Impede DOD`s Program. It provides six installation case studies addressing issues including the status of the restoration program, the cost of cleanup to date and projected costs, the cleanup options considered, the option selected, expected completion, and the applicable cleanup standards. The case studies also provide installation specific information on reasons installation was listed on the NPL, the regulatory process, cooperation between the installation and the regulatory agencies, staffing at the installations and the regulatory agencies, and the process for funding the cleanup.

  18. Gigabits to the Desktop: Installing tomorrow`s networks today

    SciTech Connect

    Kuhfuss, T.C.; Phillips, P.T.

    1994-03-01

    Argonne is one of the US Department of Energy`s world class research institutions. Leading edge computing tools and networks allow Argonne to maintain and enhance this reputation. One current effort to deploy leading edge tools is the Argonne ``Gigabits to the Desktop`` project. While the delivering and using gigabits to the desktop is little more than a hope at this time, this paper will discuss the hurdles to achieving it and how to tear down as many hurdles as possible. Under this project, four distinct areas are being investigated and enhanced. This paper will discuss briefly the applications and tools that we see driving the requirement for gigabits to the desktop. It will touch on a functional description of our``ideal`` workstations, architectures and the candidates for the next generation network capable of delivering gigabits. Lastly, it will provide an in-depth analysis of physical layer options and attempt to prove that this area, while the least risky, must be done properly, with the proper media. This paper assumes one important point. It assumes that bandwidth is essentially free. We will discuss network architectures and physical installation recommendations which have a fixed cost. However on a campus, there is no marginal cost for additional packets on these networks once the network infrastructure is installed. This point is important when extrapolating our conclusions to the wide area. The marginal cost of a packet sent to a commercial network is usually non zero. This fact may prove to be a great hindrance in migrating the applications mentioned beyond the organizational boundaries.

  19. Vortex generator installation studies on steady state and dynamic inlet distortion

    NASA Technical Reports Server (NTRS)

    Anderson, Bernhard H.; Gibb, James

    1996-01-01

    The theoretical and experimental work carried out under the NASA/MOD Joint Aeronautical Program has shown that CFD vortex generator installations designs successfully managed inlet duct flow distortion and that significant benefits in flow unsteadiness at the engine face were also present. The main conclusions to date from the collaborative effort between NASA/Lewis and DRA/Bedford are as follows: (1) vortex generator installations can be designed to be effective over a wide range of inlet operating conditions using Computational Fluid Dynamics and formal optimization procedures, (2) reductions in steady state engine face distortion of up to 80% have been measured in the M2129 inlet S-duct using CFD designed vortex generator installations, (3) reductions in flow unsteadiness of up to 80% have been measured in the W129 inlet S-duct using CFD designed vortex generator installations, and (4) the Reduced Navier-Stokes code RNS3D is a useful tool to design vortex generator installations to manage engine face distortions over a wide range of inlet operating conditions.

  20. Requiring suspended drunk drivers to install alcohol interlocks to reinstate their licenses: effective?

    PubMed Central

    Voas, Robert B.; Tippetts, S. Scott; Fisher, Deborah; Grosz, Milton

    2015-01-01

    Aims To evaluate a new method being used by some states for motivating interlock installation by requiring it as a prerequisite to reinstatement of the driver’s license. Design The driving records of Florida DWI offenders convicted between July 2002 and June 2008 were analyzed to determine the proportion of offenders subject to the interlock requirement who installed interlocks. Setting Most driving-while-impaired (DWI) offenders succeed in avoiding state laws requiring the installation of a vehicle alcohol interlock. Participants A total of 82 318 Florida DWI offenders. Findings Due to long periods of complete suspension when no driving was permitted and the failure to complete all the requirements imposed by the court, only 21 377 of the 82 318 offenders studied qualified for reinstatement, but 93% of those who qualified did install interlocks to be reinstated. Conclusions Because of the lengthy license suspensions and other barriers that the offenders face in qualifying for reinstatement, it is not clear that requiring a period on the interlock as a prerequisite to reinstating will greatly increase the current installment rate. PMID:20528811

  1. Topo-Iberia GPS network: installation complete

    NASA Astrophysics Data System (ADS)

    Khazaradze, G.

    2009-04-01

    As part of the project, titled "Geociencias en Iberia: Estudios integrados de topografía y evolución 4D: Topo-Iberia", we have established a network of 26 continuous GPS stations, covering the Spanish part of the Iberian Peninsula (22 stations) and Morocco (4 stations). A major objective behind the establishment of this array is to monitor millimeter level deformation of the crust due to the collision of African and Eurasian (including Iberian) tectonic plates. More specific goals of the project include the identification of the areas and/or specific seismic faults which exhibit higher deformation rates, which could imply an increased seismic hazard in these specific areas. The network has been designed as two X-shaped transects crossing the peninsula from NE to SW and NW to SE, with relatively coarse distribution of the stations, superimposed with denser coverage in the seismically active areas of the Betics, Pyrenees and Cantabrian chains. The majority of the built monuments consist of 1.5-1.8 m tall concrete pillars of 40 cm in diameter anchored to the bedrock using iron rebars. One station in Huesca was built according the UNAVCO's short drilled braced monument (SDBM) specifications. All the monuments were equipped with the SCIGN leveling mounts to ensure the precise antenna alignment and re-alignment in case of the antenna replacement, as well as, tamper resistance of the monument mark. In places were the snow accumulation was possible the antennas were covered with plastic radomes. The instrumentation used is Trimble NetRS dual-frequency receivers with choke-ring antennas. The communication is mainly via cellular telephone system. As of December 2008, the network installation has been competed and all the stations are fully operational. Here we report the milestones of the installation of the network and, as well as, present the first preliminary results of the analysis of the data. Besides the newly established Topo-Iberia CGPS stations, we have included

  2. Production Facility Prototype Blower Installation Report

    SciTech Connect

    Woloshun, Keith Albert; Dale, Gregory E.; Dalmas, Dale Allen; Romero, Frank Patrick

    2015-07-28

    The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating.  Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere.  With the increased beam heating, the helium flow requirement increased so that a larger blower was need for a mass flow rate of 400 g/s at 2.76 MPa (400 psig).  An Aerzen GM 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing.  This report describes this blower/motor/ppressure vessel package and the status of the facility preparations.

  3. Minimal Technologies Application Project: Planning and installation

    SciTech Connect

    Zellmer, S.D.; Hinchman, R.R.; Severinghaus, W.D.; Johnson, D.O.; Brent, J.J.

    1989-03-01

    Intensive and continuous tactical training during the last 35 years at the Hohenfels Training Area in West Germany has caused the loss of vegetative ground cover and has accelerated soil erosion rates, resulting in extensive environmental damage, safety hazards, and unrealistic training habitats. The objectives of this project are to develop and evaluate revegetation procedures for establishing adequate vegetative cover to control erosion at minimal costs and disruption to training activities. This project involved the development and installation of 12 revegetation procedures that combined four seedbed preparation methods and seeding options with three site-closure periods. In March 1987, the four seedbed preparation/seeding options and closure periods were selected, a study site design and location chosen, and specifications for the revegetation procedures developed. A German rehabilitation contractor attempted the specified seedbed preparation and seeding on the 13.5-ha site in June, but abnormally high rainfall, usually wet site conditions, and lack of adequate equipment prevented the contractor from completing six of the 12 planned procedures. Planning and execution of the project has nonetheless provided valuable information on the importance and use of soil analytical results, seed availability and cost data, contractor equipment requirements, and time required for planning future revegetation efforts. Continued monitoring of vegetative ground cover at the site for the next two years, combined with cost information, will provide necessary data to determine which of the six revegetation procedures is the most effective. These data will be used in planning future rehabilitation efforts on tactical training areas.

  4. Gasket and snap ring installation tool

    DOEpatents

    Southerland, Jr., James M.; Barringer, Jr., Curtis N.

    1994-01-01

    A tool for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove.

  5. Gasket and snap ring installation tool

    SciTech Connect

    Southerland, J.M. Jr.; Barringer, C.N. Jr.

    1994-09-06

    A tool is disclosed for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove. 6 figs.

  6. Gasket and snap ring installation tool

    SciTech Connect

    Southerland, J.M., Sr.; Barringer, C.N., Sr.

    1993-08-23

    This invention is comprised of a tool for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove.

  7. CFPL installs products pipeline with directional drilling

    SciTech Connect

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland {number_sign}70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line.

  8. 20 CFR 220.112 - Conclusions by physicians concerning the claimant's disability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 1 2012-04-01 2012-04-01 false Conclusions by physicians concerning the claimant's disability. 220.112 Section 220.112 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT DETERMINING DISABILITY Medical Considerations § 220.112 Conclusions by physicians concerning the...

  9. 20 CFR 220.112 - Conclusions by physicians concerning the claimant's disability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 1 2013-04-01 2012-04-01 true Conclusions by physicians concerning the claimant's disability. 220.112 Section 220.112 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT DETERMINING DISABILITY Medical Considerations § 220.112 Conclusions by physicians concerning the...

  10. 20 CFR 220.112 - Conclusions by physicians concerning the claimant's disability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 1 2011-04-01 2011-04-01 false Conclusions by physicians concerning the claimant's disability. 220.112 Section 220.112 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT DETERMINING DISABILITY Medical Considerations § 220.112 Conclusions by physicians concerning the...

  11. 40 CFR 78.17 - Proposed findings and conclusions and supporting brief.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Proposed findings and conclusions and supporting brief. 78.17 Section 78.17 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPEAL PROCEDURES § 78.17 Proposed findings and conclusions and...

  12. Bias in Prediction: A Closer Look at Theory, Findings, and Conclusions.

    ERIC Educational Resources Information Center

    Gonzalez-Tamayo, Eulogio

    The findings and conclusions from research on predictive validity among markedly different groups are discussed. Empirical findings using the regression line neither support nor contradict the existence of bias or the hypothesis of differential validity. Conclusions drawn from the research are questionable. Elimination of bias in a test, contrary…

  13. 47 CFR 1.264 - Contents of findings of fact and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Contents of findings of fact and conclusions. 1... Hearing Proceedings Hearing and Intermediate Decision § 1.264 Contents of findings of fact and conclusions. Proposed findings of fact shall be set forth in serially numbered paragraphs and shall set out in...

  14. 43 CFR 4.1126 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Proposed findings of fact and conclusions... Appeals Evidentiary Hearings § 4.1126 Proposed findings of fact and conclusions of law. The administrative law judge shall allow the parties to a proceeding an opportunity to submit proposed findings of...

  15. 43 CFR 4.1126 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Proposed findings of fact and conclusions... Appeals Evidentiary Hearings § 4.1126 Proposed findings of fact and conclusions of law. The administrative law judge shall allow the parties to a proceeding an opportunity to submit proposed findings of...

  16. 47 CFR 1.264 - Contents of findings of fact and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Contents of findings of fact and conclusions. 1... Hearing Proceedings Hearing and Intermediate Decision § 1.264 Contents of findings of fact and conclusions. Proposed findings of fact shall be set forth in serially numbered paragraphs and shall set out in...

  17. 43 CFR 4.1126 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Proposed findings of fact and conclusions... Appeals Evidentiary Hearings § 4.1126 Proposed findings of fact and conclusions of law. The administrative law judge shall allow the parties to a proceeding an opportunity to submit proposed findings of...

  18. 37 CFR 351.14 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2012-07-01 2012-07-01 false Proposed findings of fact and... fact and conclusions of law. (a) Any party to the proceeding may file proposed findings of fact and... determination unless the provision conflicts with a proposed finding of fact or conclusion of law filed by...

  19. 37 CFR 351.14 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2014-07-01 2014-07-01 false Proposed findings of fact and... fact and conclusions of law. (a) Any party to the proceeding may file proposed findings of fact and... determination unless the provision conflicts with a proposed finding of fact or conclusion of law filed by...

  20. 37 CFR 351.14 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Proposed findings of fact and... fact and conclusions of law. (a) Any party to the proceeding may file proposed findings of fact and... determination unless the provision conflicts with a proposed finding of fact or conclusion of law filed by...

  1. 47 CFR 1.264 - Contents of findings of fact and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Contents of findings of fact and conclusions. 1... Hearing Proceedings Hearing and Intermediate Decision § 1.264 Contents of findings of fact and conclusions. Proposed findings of fact shall be set forth in serially numbered paragraphs and shall set out in...

  2. 43 CFR 4.1126 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Proposed findings of fact and conclusions... Appeals Evidentiary Hearings § 4.1126 Proposed findings of fact and conclusions of law. The administrative law judge shall allow the parties to a proceeding an opportunity to submit proposed findings of...

  3. 43 CFR 4.1126 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Proposed findings of fact and conclusions... Appeals Evidentiary Hearings § 4.1126 Proposed findings of fact and conclusions of law. The administrative law judge shall allow the parties to a proceeding an opportunity to submit proposed findings of...

  4. 37 CFR 351.14 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2013-07-01 2013-07-01 false Proposed findings of fact and... fact and conclusions of law. (a) Any party to the proceeding may file proposed findings of fact and... determination unless the provision conflicts with a proposed finding of fact or conclusion of law filed by...

  5. 47 CFR 1.264 - Contents of findings of fact and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Contents of findings of fact and conclusions. 1... Hearing Proceedings Hearing and Intermediate Decision § 1.264 Contents of findings of fact and conclusions. Proposed findings of fact shall be set forth in serially numbered paragraphs and shall set out in...

  6. 21 CFR 1316.64 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 9 2013-04-01 2013-04-01 false Proposed findings of fact and conclusions of law... ADMINISTRATIVE FUNCTIONS, PRACTICES, AND PROCEDURES Administrative Hearings § 1316.64 Proposed findings of fact and conclusions of law. Any party in the hearing may file in quintuplicate proposed findings of...

  7. 21 CFR 1316.64 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Proposed findings of fact and conclusions of law... ADMINISTRATIVE FUNCTIONS, PRACTICES, AND PROCEDURES Administrative Hearings § 1316.64 Proposed findings of fact and conclusions of law. Any party in the hearing may file in quintuplicate proposed findings of...

  8. 37 CFR 351.14 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Proposed findings of fact and... fact and conclusions of law. (a) Any party to the proceeding may file proposed findings of fact and... determination unless the provision conflicts with a proposed finding of fact or conclusion of law filed by...

  9. 21 CFR 1316.64 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 9 2014-04-01 2014-04-01 false Proposed findings of fact and conclusions of law... ADMINISTRATIVE FUNCTIONS, PRACTICES, AND PROCEDURES Administrative Hearings § 1316.64 Proposed findings of fact and conclusions of law. Any party in the hearing may file in quintuplicate proposed findings of...

  10. 47 CFR 1.264 - Contents of findings of fact and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Contents of findings of fact and conclusions. 1... Hearing Proceedings Hearing and Intermediate Decision § 1.264 Contents of findings of fact and conclusions. Proposed findings of fact shall be set forth in serially numbered paragraphs and shall set out in...

  11. 21 CFR 1316.64 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Proposed findings of fact and conclusions of law... ADMINISTRATIVE FUNCTIONS, PRACTICES, AND PROCEDURES Administrative Hearings § 1316.64 Proposed findings of fact and conclusions of law. Any party in the hearing may file in quintuplicate proposed findings of...

  12. 43 CFR 46.325 - Conclusion of the environmental assessment process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... to prepare an environmental impact statement; (2) A finding of no significant impact; or (3) A result... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Conclusion of the environmental assessment... IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969 Environmental Assessments § 46.325 Conclusion...

  13. 43 CFR 46.325 - Conclusion of the environmental assessment process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... to prepare an environmental impact statement; (2) A finding of no significant impact; or (3) A result... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Conclusion of the environmental assessment... IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969 Environmental Assessments § 46.325 Conclusion...

  14. 40 CFR 78.17 - Proposed findings and conclusions and supporting brief.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Proposed findings and conclusions and supporting brief. 78.17 Section 78.17 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPEAL PROCEDURES § 78.17 Proposed findings and conclusions and...

  15. Interpreting systematic reviews: are we ready to make our own conclusions? A cross-sectional study

    PubMed Central

    2011-01-01

    Background Independent evaluation of clinical evidence is advocated in evidence-based medicine (EBM). However, authors' conclusions are often appealing for readers who look for quick messages. We assessed how well a group of Malaysian hospital practitioners and medical students derived their own conclusions from systematic reviews (SRs) and to what extent these were influenced by their prior beliefs and the direction of the study results. Methods We conducted two cross-sectional studies: one with hospital practitioners (n = 150) attending an EBM course in June 2008 in a tertiary hospital and one with final-year medical students (n = 35) in November 2008. We showed our participants four Cochrane SR abstracts without the authors' conclusions. For each article, the participants chose a conclusion from among six options comprising different combinations of the direction of effect and the strength of the evidence. We predetermined the single option that best reflected the actual authors' conclusions and labelled this as our best conclusion. We compared the participants' choices with our predetermined best conclusions. Two chosen reviews demonstrated that the intervention was beneficial ("positive"), and two others did not ("negative"). We also asked the participants their prior beliefs about the intervention. Results Overall, 60.3% correctly identified the direction of effect, and 30.1% chose the best conclusions, having identified both the direction of effect and the strength of evidence. More students (48.2%) than practitioners (22.2%) chose the best conclusions (P < 0.001). Fewer than one-half (47%) correctly identified the direction of effect against their prior beliefs. "Positive" SRs were more likely than "negative" SRs to change the participants' beliefs about the effect of the intervention (relative risk (RR) 1.8, 95% confidence interval 1.3 to 2.6) and "convert" those who were previously unsure by making them choose the appropriate direction of effect (RR 1

  16. Preventive medicine oversight of splash pads on military installations.

    PubMed

    Hardcastle, Lisa Raysby; Perry, Matthew; Browne, Ashley

    2015-01-01

    Over the past several years, an increasing number of military installations have installed splash pads that provide fun, recreational water entertainment for Soldiers and their families. The addition of splash pads brings added responsibilities for medical treatment facility preventive medicine oversight and installation facilities maintenance to ensure a safe and healthy environment. Currently, there are no consistent standards or detailed guidance for military installations to follow when installing and maintaining splash pads. The central issues associated with splash pads on military installations are water quality and risk for waterborne illnesses, responsibility for safety and health oversight, and federal energy and water sustainability mandates. This article examines the importance of implementing a standard for design and oversight to ensure the health and safety of Soldiers and their families. PMID:25651143

  17. Results from inspections of farmer-installed rollover protective structures.

    PubMed

    Sorensen, Julie A; McKenzie, Tony; Purschwitz, Mark; Fiske, Todd; Jenkins, Paul L; O'Hara, Patrick; May, John J

    2011-01-01

    This study sought to assess the feasibility of self-installing rollover protective structures (ROPS) and to identify any patterns of self-installation deficiencies in a sample of New York ROPS Retrofit Rebate Program participants. Inspection engineers looked for/at damage, rust, holes, deteriorated welding, location of attachment, axle housing, the presence of original plates/bolts, and adequate seatbelt installation. Results indicated that only 31% of farmers received correct parts and also installed these parts properly. Ten percent of self-installed tractors had installation problems so severe they were referred to a dealer for correction. Issues with seatbelts, torque, and unmarked or defective bolts in ROPS kits were also detected. PMID:21213161

  18. Forensic scientists' conclusions: how readable are they for non-scientist report-users?

    PubMed

    Howes, Loene M; Kirkbride, K Paul; Kelty, Sally F; Julian, Roberta; Kemp, Nenagh

    2013-09-10

    Scientists have an ethical responsibility to assist non-scientists to understand their findings and expert opinions before they are used as decision-aids within the criminal justice system. The communication of scientific expert opinion to non-scientist audiences (e.g., police, lawyers, and judges) through expert reports is an important but under-researched issue. Readability statistics were used to assess 111 conclusions from a proficiency test in forensic glass analysis. The conclusions were written using an average of 23 words per sentence, and approximately half of the conclusions were expressed using the active voice. At an average Flesch-Kincaid Grade level of university undergraduate (Grade 13), and Flesch Reading Ease score of difficult (42), the conclusions were written at a level suitable for people with some tertiary education in science, suggesting that the intended non-scientist readers would find them difficult to read. To further analyse the readability of conclusions, descriptive features of text were used: text structure; sentence structure; vocabulary; elaboration; and coherence and unity. Descriptive analysis supported the finding that texts were written at a level difficult for non-scientists to read. Specific aspects of conclusions that may pose difficulties for non-scientists were located. Suggestions are included to assist scientists to write conclusions with increased readability for non-scientist readers, while retaining scientific integrity. In the next stage of research, the readability of expert reports in their entirety is to be explored. PMID:23890623

  19. Installation package for a Sunspot Cascade Solar Water Heating System

    SciTech Connect

    1980-09-01

    Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.

  20. Summary of HEAT 1 Aeroacoustics Installation Effects

    NASA Technical Reports Server (NTRS)

    Smith, Brian E.; Zuniga, Fanny A.; Soderman, Paul T.

    1999-01-01

    changes in the ratio of ejector-duct-to-jet-area over a wide range range of nozzle pressure ratios and freestream Mach numbers. The test also measured the thrust performance, ambient-flow aspiration ratio, and internal and external static pressures on the nozzles. The isolated aeroacoustic performance data has been compared with results obtained with this nozzle installed on a 13.5% Boeing Reference H HSCT configuration, semi-span model. The semi-span, aeroacoustics integration test documented the first-order effects of the airframe flowfield on the acoustic performance of the nozzle and the effect of the nozzle secondary inlet flows on the aerodynamic performance of the wing high-lift systems. This investigation is critical to understanding the mutual installation effects of mixer/ejector nozzles and wing high-lift systems.

  1. [The reliable and plausible conclusions in the decisions of the forensic medical experts].

    PubMed

    Kovalev, A V; Shmarov, L A; Ten'kov, A A

    2016-01-01

    The authors characterize in brief the conclusions drawn by the forensic medical experts in the course of their professional activities with special reference to their reliability and plausibility. The most common errors creeping into the conclusions are discussed together with the approaches to their prevention and/or correction. This article continues a series of publications of the same authors concerning the main logical errors encountered in the conclusions of the forensic medical experts. The results of a deeper analysis of such errors will be published elsewhere. PMID:27030098

  2. Inappropriate statistical method in a parallel-group randomized controlled trial results in unsubstantiated conclusions.

    PubMed

    Dimova, Rositsa B; Allison, David B

    2016-01-01

    The conclusions of Cassani et al. in the January 2015 issue of Nutrition Journal (doi: 10.1186/1475-2891-14-5 ) cannot be substantiated by the analysis reported nor by the data themselves. The authors ascribed the observed decrease in inflammatory markers to the components of flaxseed and based their conclusions on within-group comparisons made between the final and the baseline measurements separately in each arm of the randomized controlled trial. However, this is an improper approach and the conclusions of the paper are invalid. A correct analysis of the data shows no such effects. PMID:27265269

  3. Global Hawk instrument installation for GRIP hurricane mission

    NASA Video Gallery

    Technicians from NASA's Jet Propulsion Laboratory, Ames and Goddard field centers prepare and install specialized environmental monitoring instrumentation on NASA's Global Hawk No. 872 at the Dryde...

  4. 46 CFR 115.702 - Installation tests and inspections.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial inspection for...

  5. 7. STONE PIER OF ORIGINAL WATERWHEEL INSTALLATION DOWNSTREAM FROM MILL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. STONE PIER OF ORIGINAL WATERWHEEL INSTALLATION DOWNSTREAM FROM MILL William E. Barrett, photographer, 1973 (copy negative) - Thomas Shepherd's Grist Mill, High Street Vicinity, Shepherdstown, Jefferson County, WV

  6. The Process of Installing REDCap, a Web Based Database Supporting Biomedical Research

    PubMed Central

    Mare, I.; Hazelhurst, S.; Kramer, B.

    2014-01-01

    Summary Background Clinical and research data are essential for patient care, research and healthcare system planning. REDCapTM is a web-based tool for research data curatorship developed at Vanderbilt University in Nashville, USA. The Faculty of Health Sciences at the University of the Witwatersrand, Johannesburg South Africa identified the need for a cost effective data management instrument. REDCap was installed as per the user agreement with Vanderbilt University in August 2012. Objectives In order to assist other institutions that may lack the in-house Information Technology capacity, this paper describes the installation and support of REDCap and incorporates an analysis of user uptake over the first year of use. Methods We reviewed the staffing requirements, costs of installation, process of installation and necessary infrastructure and end-user requests following the introduction of REDCap at Wits. The University Legal Office and Human Research Ethics Committee were consulted regarding the REDCap end-user agreement. Bi-monthly user meetings resulted in a training workshop in August 2013. We compared our REDCap software user numbers and records before and after the first training workshop. Results Human resources were recruited from existing staff. Installation costs were limited to servers and security certificates. The total costs to provide a functional REDCap platform was less than $9000. Eighty-one (81) users were registered in the first year. After the first training workshop the user numbers increased by 59 in one month and the total number of active users to 140 by the end of August 2013. Custom software applications for REDCap were created by collaboration between clinicians and software developers. Conclusion REDCap was installed and maintained at limited cost. A small number of people with defined skills can support multiple REDCap users in two to four hours a week. End user training increased in the number of users, number of projects created and

  7. FIELD EVALUATION OF THE IN-SITU TREATMENTS TO REDUCE SOIL LEAD BIOAVAILABILITY: CONCLUSIONS

    EPA Science Inventory

    This presentation summarizes the conclusion of the technical issues associated with the Pb bioavailability experiment which IINERT has been conducting and further to illustrate that although bioavailability is a simple concept, its measurement and the implementation of the measur...

  8. 39 CFR 964.14 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... submit proposed findings of fact, conclusions of law, orders, and supporting reasons. Unless given orally... record or given consideration. (b) Except when presented orally before the close of the hearing,...

  9. Meeting of the Strategic Advisory Group of Experts on immunization, October 2009--Conclusions and recommendations.

    PubMed

    2010-01-01

    The conclusions and recommendations from the October 2009 meeting of the Strategic Advisory Group of Experts (SAGE) on immunization have been published in the WHO weekly epidemiological record (December 11, 2009) and are reproduced with the permission. PMID:20093043

  10. Design, Installation, and Initial Commissioning of the MTA Beamline

    SciTech Connect

    Moore, Craig; Anderson, John; Garcia, Fernanda; Gerardi, Michael; Johnstone, Carol; Kobilarcik, Thomas; Kucera, Michael; Kufer, Mathew; Newhart, Duane; Rakhno, Igor; Vogel, Gregory; /Fermilab

    2010-05-01

    A new experimental area designed to develop, test and verify muon ionization cooling apparatus using the 400-MeV Fermilab Linac proton beam has been fully installed and is presently being commissioned. Initially, this area was used for cryogenic tests of liquid-hydrogen absorbers for the MUCOOL R&D program and, now, for high-power beam tests of absorbers, high-gradient rf cavities in the presence of magnetic fields (including gas-filled cavities), and other prototype muon-cooling apparatus. The experimental scenarios being developed for muon facilities involve collection, capture, and cooling of large-emittance, high-intensity muon beams--{approx}10{sup 13} muons, so that conclusive tests of the apparatus require full Linac beam, which is 1.6 x 10{sup 13} p/pulse. To support the muon cooling facility, this new primary beamline extracts and transports beam directly from the Linac to the test facility. The design concept for the MuCool facility is taken from an earlier proposal [1], but modifications were necessary to accommodate high-intensity beam, cryogenics, and the increased scale of the cooling experiments. Further, the line incorporates a specialized section and utilizes a different mode of operation to provide precision measurements of Linac beam parameters. This paper reports on the technical details of the MuCool beamline for both modes.

  11. A fallacious jar? The peculiar relation between descriptive premises and normative conclusions in neuroethics.

    PubMed

    Wagner, Nils-Frederic; Northoff, Georg

    2015-06-01

    Ethical questions have traditionally been approached through conceptual analysis. Inspired by the rapid advance of modern brain imaging techniques, however, some ethical questions appear in a new light. For example, hotly debated trolley dilemmas have recently been studied by psychologists and neuroscientists alike, arguing that their findings can support or debunk moral intuitions that underlie those dilemmas. Resulting from the wedding of philosophy and neuroscience, neuroethics has emerged as a novel interdisciplinary field that aims at drawing conclusive relationships between neuroscientific observations and normative ethics. A major goal of neuroethics is to derive normative ethical conclusions from the investigation of neural and psychological mechanisms underlying ethical theories, as well as moral judgments and intuitions. The focus of this article is to shed light on the structure and functioning of neuroethical arguments of this sort, and to reveal particular methodological challenges that lie concealed therein. We discuss the methodological problem of how one can--or, as the case may be, cannot--validly infer normative conclusions from neuroscientific observations. Moreover, we raise the issue of how preexisting normative ethical convictions threaten to invalidate the interpretation of neuroscientific data, and thus arrive at question-begging conclusions. Nonetheless, this is not to deny that current neuroethics rightly presumes that moral considerations about actual human lives demand empirically substantiated answers. Therefore, in conclusion, we offer some preliminary reflections on how the discussed methodological challenges can be met. PMID:25985843

  12. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction... this chapter. Systems of this type include the following: Steering systems. Power for going...

  13. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction... this chapter. Systems of this type include the following: Steering systems. Power for going...

  14. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction... this chapter. Systems of this type include the following: Steering systems. Power for going...

  15. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction... this chapter. Systems of this type include the following: Steering systems. Power for going...

  16. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction... this chapter. Systems of this type include the following: Steering systems. Power for going...

  17. 24 CFR 3286.305 - Installation trainer criteria.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Installation trainer criteria. 3286...-Administered States § 3286.305 Installation trainer criteria. (a) Trainer qualification required. (1) All... by trainers who are registered with HUD as qualified trainers. In order to register with HUD as...

  18. 33 CFR 183.550 - Fuel tanks: Installation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Fuel tanks: Installation. 183.550 Section 183.550 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Manufacturer Requirements § 183.550 Fuel tanks: Installation. (a) Each fuel tank...

  19. 47 CFR 80.291 - Installation of direction finder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Installation of direction finder. 80.291... Installation of direction finder. (a) The direction finder must be located to minimize interference from noise. (b) The direction finder antenna system must be erected so that the determination of bearings...

  20. 47 CFR 80.291 - Installation of direction finder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Installation of direction finder. 80.291... Installation of direction finder. (a) The direction finder must be located to minimize interference from noise. (b) The direction finder antenna system must be erected so that the determination of bearings...

  1. 14 CFR 29.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Equipment, systems, and installations. 29.1309 Section 29.1309 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment General § 29.1309 Equipment, systems, and installations. (a)...

  2. 14 CFR 23.967 - Fuel tank installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel tank installation. 23.967 Section 23.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.967 Fuel tank installation. (a) Each...

  3. 49 CFR 192.359 - Customer meter installations: Operating pressure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Customer meter installations: Operating pressure... Meters, Service Regulators, and Service Lines § 192.359 Customer meter installations: Operating pressure. (a) A meter may not be used at a pressure that is more than 67 percent of the manufacturer's...

  4. 14 CFR 25.1385 - Position light system installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Position light system installation. 25.1385 Section 25.1385 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Lights § 25.1385 Position light system installation. (a) General. Each...

  5. 14 CFR 29.1385 - Position light system installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Position light system installation. 29.1385 Section 29.1385 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Lights § 29.1385 Position light system installation. (a) General. Each...

  6. 14 CFR 25.1385 - Position light system installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Position light system installation. 25.1385 Section 25.1385 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Lights § 25.1385 Position light system installation. (a) General. Each...

  7. 14 CFR 27.1385 - Position light system installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Position light system installation. 27.1385 Section 27.1385 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment Lights § 27.1385 Position light system installation. (a) General. Each part...

  8. 14 CFR 29.1385 - Position light system installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Position light system installation. 29.1385 Section 29.1385 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Lights § 29.1385 Position light system installation. (a) General. Each...

  9. 14 CFR 27.1385 - Position light system installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Position light system installation. 27.1385 Section 27.1385 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment Lights § 27.1385 Position light system installation. (a) General. Each part...

  10. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Permanent radiographic installations. 34.33 Section 34.33... REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a) Each entrance that is used for personnel access to the high radiation area in a permanent...

  11. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Permanent radiographic installations. 34.33 Section 34.33... REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a) Each entrance that is used for personnel access to the high radiation area in a permanent...

  12. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Permanent radiographic installations. 34.33 Section 34.33... REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a) Each entrance that is used for personnel access to the high radiation area in a permanent...

  13. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Permanent radiographic installations. 34.33 Section 34.33... REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a) Each entrance that is used for personnel access to the high radiation area in a permanent...

  14. 46 CFR 176.702 - Installation tests and inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and inspections. Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system... inspection for certification of the vessel, as replacement equipment or as a new installation, the owner...

  15. 46 CFR 176.702 - Installation tests and inspections.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and inspections. Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system... inspection for certification of the vessel, as replacement equipment or as a new installation, the owner...

  16. 33 CFR 183.550 - Fuel tanks: Installation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Fuel tanks: Installation. 183.550...) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Manufacturer Requirements § 183.550 Fuel tanks: Installation. (a) Each fuel tank must not be integral with any boat structure or mounted on an engine. (b)...

  17. 14 CFR 25.967 - Fuel tank installations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel tank installations. 25.967 Section 25... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.967 Fuel tank installations. (a) Each fuel tank must be supported so that tank loads (resulting from the weight of the fuel in...

  18. 14 CFR 27.967 - Fuel tank installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel tank installation. 27.967 Section 27... AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.967 Fuel tank installation. (a) Each fuel tank must be supported so that tank loads are not concentrated on unsupported tank...

  19. Installation of Ceramic Tile: Residential Thin-Set Methods.

    ERIC Educational Resources Information Center

    Short, Sam

    This curriculum guide contains materials for use in teaching a course on residential thin-set methods of tile installation. Covered in the individual units are the following topics: the tile industry; basic math; tools; measurement; safety in tile setting; installation materials and guidelines for their use; floors; counter tops and backsplashes;…

  20. Installation package for Hyde Memorial Observatory, Lincoln, Nebraska

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information for a solar heating system installed in Hyde Memorial Observatory at Lincoln, Nebraska is presented. This package included a system operation and maintenance manual, hardware brochures, schematics, system operating modes, and drawings. This prototype solar heating system consisted of the following subsystems: solar collector, control, and storage.

  1. 45 CFR 30.17 - Collection in installments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Collection in installments. 30.17 Section 30.17 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CLAIMS COLLECTION Standards for the Administrative Collection of Debts § 30.17 Collection in installments. (a) Whenever feasible, the total amount of a debt shall...

  2. 30 CFR 77.509 - Transformers; installation and guarding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground,...

  3. 40. 1911 ELECTRIC MOTOR INSTALLATION: Photocopy of July 1911 photograph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. 1911 ELECTRIC MOTOR INSTALLATION: Photocopy of July 1911 photograph showing the installed 600hp General Electric motor at the Washington and Mason Streets powerhouse. View towards the south wall of the first floor. Note the engineer's shack and switchboard behind the motor and its pinion gear. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  4. Solar hot water system installed at Mobile, Alabama

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The system consists of six rows of ten collectors and three rows of eleven collectors (1990 square feet) mounted on the roof. Griswald flow control valves were installed to regulate the flow to each row. Two Heliotrope electronic thermometers with a combined capability of measuring the temperatures of 22 different locations were installed for monitoring purposes.

  5. Delta FUSE Fairing Installation at Launch Complex 17A

    NASA Technical Reports Server (NTRS)

    1999-01-01

    This NASA Kennedy Space Center (KSC) video release presents footage of the June 19, 1999 installation of the fairing around the Far Ultraviolet Spectroscopic Explorer (FUSE) spacecraft. The spacecraft was previously mated to the Boeing Delta II rocket. Installation took place on Pad A of Launch Complex 17.

  6. 32 CFR 634.40 - General off installation traffic activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false General off installation traffic activities. 634... (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.40 General off installation traffic activities. In areas not under military control,...

  7. 32 CFR 634.40 - General off installation traffic activities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false General off installation traffic activities. 634... (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.40 General off installation traffic activities. In areas not under military control,...

  8. 32 CFR 634.40 - General off installation traffic activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true General off installation traffic activities. 634... (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.40 General off installation traffic activities. In areas not under military control,...

  9. 32 CFR 634.40 - General off installation traffic activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true General off installation traffic activities. 634... (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.40 General off installation traffic activities. In areas not under military control,...

  10. 32 CFR 634.40 - General off installation traffic activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true General off installation traffic activities. 634... (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.40 General off installation traffic activities. In areas not under military control,...

  11. Large platform assembler non-structural system requirements. [installing utilities

    NASA Technical Reports Server (NTRS)

    Vernon, R. M.

    1981-01-01

    The impact on the design and operation of an automated structure assembler of requiring the assembler to also install the platform electrical and/or fluid utility circuits was examined. Possible utility requirements were defined and examined in conjunction with the automated assembler. Preliminary concepts are presented which permit the electrical and fluid circuits to be installed with the structural elements.

  12. 11. SIDE VIEW OF INSTALLATION OF A CONTINUOUS ROTARYTUBE HYDROFLUORINATOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. SIDE VIEW OF INSTALLATION OF A CONTINUOUS ROTARY-TUBE HYDROFLUORINATOR LOCATED IN ROOM 146. THE HYDROFLUORINATOR IS BEING INSTALLED INSIDE A GLOVE BOX. HYDROFLUORINATION CONVERTED PLUTONIUM OXIDE TO PLUTONIUM TETRAFLUORIDE. (1/11/62) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO

  13. 12. END VIEW OF INSTALLATION OF THE HYDROFLUORINATOR EQUIPMENT IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. END VIEW OF INSTALLATION OF THE HYDROFLUORINATOR EQUIPMENT IN ROOM 146. THIS HYDROFLUORINATOR WAS INSTALLED IN 1963 TO INCREASE CONTROL AND CONSISTENCY IN THIS STEP OF THE PROCESS. (1/11/62) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO

  14. Floorcovering Installer: Apprenticeship Course Outline. Apprenticeship and Industry Training. 2909

    ERIC Educational Resources Information Center

    Alberta Advanced Education and Technology, 2009

    2009-01-01

    The graduate of the Floorcovering Installer apprenticeship program is a certified journeyperson who will be able: (1) Use efficiently and safely all hand and power operated equipment used by the Journeyperson Floorcovering Installer; (2) Read and interpret drawings in relation to the trade requirement. Estimate quantities of materials required and…

  15. 32 CFR 809a.8 - Installation policies and laws.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Installation policies and laws. 809a.8 Section... Intervention and Disaster Assistance § 809a.8 Installation policies and laws. This subpart contains policies on the use of Air Force military personnel in civil disturbances and disasters. The more important...

  16. You're a What? Solar Photovoltaic Installer

    ERIC Educational Resources Information Center

    Torpey, Elka Maria

    2009-01-01

    This article talks about solar photovoltaic (PV) installer and features Rebekah Hren, a solar PV installer who puts solar panels on roofs and in other sunny places to turn the sun's power into electricity. Hren enjoys promoting renewable energy, in part because it's an emerging field. In solar PV systems, solar cells--devices that convert sunlight…

  17. 46 CFR 182.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... reference; see 46 CFR 175.600), will be considered as meeting the requirements of this section. ... 46 Shipping 7 2011-10-01 2011-10-01 false Engine exhaust pipe installation. 182.430 Section 182... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.430 Engine exhaust...

  18. 47 CFR 80.1023 - Test of radiotelephone installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Test of radiotelephone installation. 80.1023 Section 80.1023 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Radiotelephone Installations Required by the Bridge-to-Bridge Act § 80.1023 Test of...

  19. 47 CFR 80.1023 - Test of radiotelephone installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Test of radiotelephone installation. 80.1023 Section 80.1023 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Radiotelephone Installations Required by the...

  20. 47 CFR 80.1023 - Test of radiotelephone installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Test of radiotelephone installation. 80.1023 Section 80.1023 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Radiotelephone Installations Required by the Bridge-to-Bridge Act § 80.1023 Test of...