  1. Methods for generating hydroelectric power development alternatives

    SciTech Connect

    Chang, Shoou-yuh; Liaw, Shu-liang; Sale, M.J.; Railsback, S.F.

    1989-01-01

    Hydropower development on large rivers can result in a number of environmental impacts, including potential reductions in dissolved oxygen (DO) concentrations. This study presents a methodology for generating different hydropower development alternatives for evaluation. This methodology employs a Streeter-Phelps model to simulate DO, and the Bounded Implicit Enumeration algorithm to solve an optimization model formulated to maximize hydroelectric energy production subject to acceptable DO limits. The upper Ohio River basin was used to illustrate the use and characteristics of the methodology. The results indicate that several alternatives which meet the specified DO constraints can be generated efficiently, meeting both power and environmental objectives. 17 refs., 2 figs., 1 tab.

  2. ELECTRICAL SWITCHBOARD IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ELECTRICAL SWITCHBOARD IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  3. Environmental requirements at hydroelectric power plants

    SciTech Connect

    Cada, G.F.; Francfort, J.E.

    1993-12-31

    Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour.

  4. Hydroelectric power from ocean waves

    NASA Astrophysics Data System (ADS)

    Raghavendran, K.

    1981-02-01

    This paper describes a system which converts the variable energy of ocean waves into a steady supply of energy in a conventional form. The system consists of a set of floats and Persian wheels located off-shore and a storage reservoir on the shore. The floats oscillate vertically as the waves pass below them and turn their respective Persian wheels which lift sea water to a height and deliver to the reservoir through an interconnecting pipeline. The head of water in the reservoir operates a hydraulic turbine which in turn works a generator to supply electricity. Due to the recurrent wave action, water is maintained at the optimum level in the reservoir to ensure continuous power supply.

  5. Small-Scale Hydroelectric Power Demonstration Project

    SciTech Connect

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  6. Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate House, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA

  7. Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates & Gate-Lifting Mechanisms, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA

  8. Laser scanning system for inspecting large underwater hydroelectric structures

    NASA Astrophysics Data System (ADS)

    Mirallès, François; Beaudry, Julien; Blain, Michel; de Santis, Romano M.; Houde, Régis; Hurteau, Richard; Robert, André; Sarraillon, Serge; Soucy, Nathalie

    2010-04-01

    A novel robotic laser scanning system for the inspection of large underwater hydroelectric structures is proposed. This system has been developed at the Hydro Quebec Research Institute and consists of a laser camera mounted on a 2-D Cartesian manipulator. Mechanical, electronic, and software design aspects; overall operational modalities; and proof of concept results are presented. We evaluated the performances of the system in the course of laboratory experiments and inspection trials carried out under normal operating conditions at the site of three of Hydro Quebec's hydroelectric dams.

  9. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Hydroelectric power plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power Water Use Charges § 420.51 Hydroelectric power...

  10. Oblique view of southwest and southeast sides of hydroelectric power ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Oblique view of southwest and southeast sides of hydro-electric power house with upstream side of dam to left and concrete pylon at upper entrance to lock on right, view towards north - St. Lucie Canal, St. Lucie Lock No. 1, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  11. PLANAR VIEW OF NORTHEAST SIDE OF HYDROELECTRIC POWER HOUSE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLANAR VIEW OF NORTHEAST SIDE OF HYDRO-ELECTRIC POWER HOUSE AND SOUTHWEST END OF DREDGE BYPASS IN FOREGROUND, VIEW TOWARDS SOUTHWEST. - St. Lucie Canal, Lock No. 2, Dredge Bypass, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  12. Organic carbon burial efficiency in a large tropical hydroelectric reservoir

    NASA Astrophysics Data System (ADS)

    Mendonça, Raquel; Sobek, Sebastian; Kosten, Sarian; Cole, Jonathan; Cardoso, Simone; Roland, Fábio

    2014-05-01

    Because hydroelectric reservoirs receive relatively high inputs of sediments when compared to lakes and oceans, these systems are important sites for organic carbon (OC) accumulation. Nevertheless, the actual magnitude of carbon accumulating in reservoirs is poorly known due to a lack of whole-system studies of carbon burial. Hydroelectric reservoirs are also particularly heterogeneous systems in terms of organic carbon sources and sedimentation rates. Such heterogeneity leads to strong variations on carbon fluxes, even though the effect on OC burial has not yet been discussed. The aim of this paper was to determine the OC burial rate and efficiency in a large tropical reservoir and evaluate the importance of spatial heterogeneity affecting OC burial. Burial rates were determined through a novel approach which combines sediment sample analyses and a seismic survey. Our results confirm the major effect of sedimentation heterogeneity on OC burial efficiency which varied from 9 to 89% in the reservoir. In addition to the river-dam gradient of sedimentation, our data reinforce the importance of basin morphometry in determining the patterns of sediment deposition and carbon accumulation. No carbon accumulation occurred along the margins of the reservoir and irregular bottom morphology leaded to irregular carbon deposition. An integrative analysis, including the reservoir's heterogeneity, indicated that the whole system accumulates 42.2 g C m-2 yr-1 and that roughly 67% of the total OC load to the sediments is actually buried. The data also suggest that the sediment of the reservoir is mainly composed of terrestrial OC and that the heterogeneity in OC sources plays a minor role determining OC burial efficiency, which was strongly determined by sediment accumulation rate. Finally, our results in combination with literature data suggest that the high sedimentation rates cause hydroelectric reservoirs to accumulate carbon more efficiently than lakes, regardless of

  13. Impact of High Wind Power Penetration on Hydroelectric Unit Operations

    SciTech Connect

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-01-01

    The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

  14. Study on safety operation for large hydroelectric generator unit

    NASA Astrophysics Data System (ADS)

    Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.

    2012-11-01

    Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.

  15. Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS

    SciTech Connect

    Hodge, B.-M.; Lew, D.; Milligan, M.

    2011-07-01

    This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

  16. Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint

    SciTech Connect

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-10-01

    This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

  17. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-21

    ... Energy Regulatory Commission Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project... that could be affected by issuance of a new license for the Otter Creek Hydroelectric Project No. 2558..., as applicant for the Otter Creek Hydroelectric Project, has expressed an interest in this...

  18. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... power operations with power marketing agencies. 209.141 Section 209.141 Navigation and Navigable Waters... Coordination of hydroelectric power operations with power marketing agencies. (a) Purpose. This regulation... generating facilities with the power marketing agencies. (b) Applicability. This regulation applies to...

  19. Integration of hydroelectric power and apiary management. Final report

    SciTech Connect

    Mitchell, C.

    1983-06-19

    Appropriate Technology Grant 3-80-342 is an attempt to integrate hydroelectric power with apiary management. The biggest challenge to the efficient completion of the project was connecting with the appropriate technology and associated personel to guide the project. Most of the so called ''experts'' in this field are at an early experimental stage in technology and knowledge. The existing system is capable of generating ample electricity six to seven months out of the year. The unit was operating consistantly near the end of winter. At present, it is not running due to lack of sufficient water.

  20. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Hydroelectric power plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER... Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners...

  1. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Hydroelectric power plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER... Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners...

  2. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Hydroelectric power plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power...

  3. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Hydroelectric power plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power...

  4. Hydroelectric power in Hawaii. A report on the statewide survey of potential hydroelectric sites

    SciTech Connect

    Beck, C. A.

    1981-02-01

    An assessment was made of the hydropower potential in Hawaii. The major conclusion of this study is that hydropower resources in the State of Hawaii are substantial, and they offer the potential for major increases in hydropower generating capacity. Hydropower resources on all islands total about 50 MW of potential generating capacity. Combined with the 18 MW of existing hydropower capacity, hydropower resources potentially could generate about 307 million kWh of electric energy annually. This represents about 28% of the present combined electricity needs of the Neighbor Islands, Kauai, Molokai, Maui, and the Big Island. Hydropower resources on Kauai equal 72% of that island's electricity needs; on Molokai, 40%, on the Big Island, 20%; and on Maui, 18%. The island of Oahu, however, has only small hydropower resources, and could only generate a negligible portion of its electricity needs from this energy source. A summary of existing and future (potential) hydropower capacities and estimated annual outputs for each island is presented. How much of the potential capacity is being actively considered for development and how much is only tentatively proposed at the time is indicated. The economics of hydropower at specific sites were analyzed. The major conclusion of this analysis is that hydropower development costs vary widely among the different sites, but that generally the cost of hydroelectric power is either less than or comparable to the cost of oil-fired power.

  5. Organic carbon burial efficiency in a large tropical hydroelectric reservoir

    NASA Astrophysics Data System (ADS)

    Mendonça, R.; Kosten, S.; Sobek, S.; Cardoso, S. J.; Figueiredo-Barros, M. P.; Estrada, C. H. D.; Roland, F.

    2015-11-01

    Hydroelectric reservoirs bury significant amounts of organic carbon (OC) in their sediments. Many reservoirs are characterized by high sedimentation rates, low oxygen concentrations in bottom water, and a high share of terrestrially derived OC, and all of these factors have been linked to a high efficiency of OC burial. However, investigations of OC burial efficiency (OCBE, i.e. the ratio between OC buried and deposited) in reservoirs is limited to a few studies, none of which include spatially resolved analyses. In this study we determined the spatial variation in OCBE in a large tropical reservoir and related it to sediment characteristics. Our results show that the sediment accumulation rate explains up to 92 % of the spatial variability in OCBE, outweighing the effect of other variables, such as OC source and oxygen exposure time. OCBE at the pelagic sites varied from 48 to 86 % (mean 67 %) and decreased towards the dam. At the margins, OCBE was lower (9 to 17 %) due to the low sediment accumulation in shallow areas. Our data show that the variability in OCBE both along the rivers-dam and the margin-pelagic axes must be considered in whole-reservoir assessments. Combining these results with a spatially resolved assessment of sediment accumulation and OC burial in the studied reservoir, we estimated a whole-basin OC burial efficiency of 57 %. Being the first whole-basin assessment of OCBE in a reservoir, these results suggest that reservoirs may bury OC more efficiently than natural lakes.

  6. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    ERIC Educational Resources Information Center

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  7. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... Energy Regulatory Commission Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1... Soliciting Comments and Motions To Intervene On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric.... Applicants seek Commission approval for a partial transfer of the license for the Pejescot Project from...

  8. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse...

  9. Counter rotating type hydroelectric unit suitable for tidal power station

    NASA Astrophysics Data System (ADS)

    Kanemoto, T.; Suzuki, T.

    2010-08-01

    The counter rotating type hydroelectric unit, which is composed of the axial flow type tandem runners and the peculiar generator with double rotational armatures,was proposed to utilize effectively the tidal power. In the unit, the front and the rear runners counter drive the inner and the outer armatures of the generator, respectively. Besides, the flow direction at the rear runner outlet must coincide with the flow direction at the front runner inlet, because the angular momentum through the rear runner must coincides with that through the front runner. That is, the flow runs in the axial direction at the rear runner outlet while the axial inflow at the front runner inlet. Such operations are suitable for working at the seashore with rising and falling tidal flows, and the unit may be able to take place of the traditional bulb type turbines. The tandem runners were operated at the on-cam conditions, in keeping the induced frequency constant. The output and the hydraulic efficiency are affected by the adjustment of the front and the blade setting angles. The both optimum angles giving the maximum output and/or efficiency were presented at the various discharges/heads. To promote more the tidal power generation by this type unit, the runners were also modified so as to be suitable for both rising and falling flows. The hydraulic performances are acceptable while the output is determined mainly by the trailing edge profiles of the runner blades.

  10. Mathematical modeling of vibrations in turbogenerator sets of Sayano-Shushenskaya Hydroelectric Power Station

    NASA Astrophysics Data System (ADS)

    Leonov, G. A.; Kuznetsov, N. V.; Solovyeva, E. P.

    2016-02-01

    Oscillations in turbogenerator sets, which consist of a synchronous generator, a hydraulic turbine, and an automatic speed regulator, are investigated. This study was motivated by the emergency that took place at the Sayano-Shushenskaya Hydroelectric Power Station in 2009. During modeling of the parameters of turbogenerator sets of the Sayano-Shushenskaya Hydroelectric Power Station, the ranges corresponding to undesired oscillation regimes were determined. These ranges agree with the results of the full-scale tests of the hydropower units of the Sayano-Shushenskaya Hydroelectric Power Station performed in 1988.

  11. Small-Scale Hydroelectric Power Demonstration Project. Pennsylvania Hydroelectric Development Corporation Flat Rock Dam: Project summary report

    SciTech Connect

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  12. Legal obstacles and incentives to the development of small scale hydroelectric power in New Jersey

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in New Jersey are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is discussed. New Jersey follows the riparian theory of water law. Following an extensive discussion of the New Jersey water law, New Jersey regulatory law and financial considerations regarding hydroelectric power development are discussed.

  13. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  14. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    SciTech Connect

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  15. Water management for hydroelectric power generation at Matera and Kidatu in Tanzania

    SciTech Connect

    Matondo, J.I.; Rutashobya, D.G.

    1995-12-31

    The major sources of power in Tanzania are hydropower and thermo power. Most of the hydroelectric power is generated in the Great Ruaha river system (280 MW) and in the Pangani river system (46 MW). However, the generated power (hydro and thermo) does not meet the power demand and as a result, an accute power shortage occurred in August 1992. This paper explores the hydropower generation mechanism at Mtera and Kidatu hydroelectric power plants. It also looks into what measures could have been taken in order to avoid the massive power shedding which officially lasted for about six months, although unofficially, power shedding was continued well beyond that period. Strategies for future water management in the Great Ruaha river system for efficient generation of power are also presented.

  16. 76 FR 6820 - Contract for Hydroelectric Power Development at the C-Drop, a Feature of the Klamath Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... Bureau of Reclamation Contract for Hydroelectric Power Development at the C-Drop, a Feature of the... accept proposals, select one lessee, and contract for hydroelectric power development at the Klamath... development of electrical power resource potential on Federal water resource projects, Reclamation...

  17. Sufficient conditions of optimality for control of hydro-electric power stations

    NASA Astrophysics Data System (ADS)

    Ferreira, M. M. A.; Ribeiro, A. F.; Smirnov, G. V.

    2013-10-01

    In this paper we consider a control problem for a cascade of hydro-electric power stations where some of the stations have reversible turbines. The objective of our work is to optimize the profit of power production satisfying restrictions on the water level in the reservoirs. We obtain sufficient conditions of optimality and illustrate them with a simple example.

  18. The Effect of Hydroelectric Power Plants (hpp) on Agro-Life at Rural Land Regulation in Turkey

    NASA Astrophysics Data System (ADS)

    Onursal Denli, G.; Denli, H. H.; Seker, D. Z.; Bitik, E.; Cetin, S.

    2014-12-01

    Turkey is one of the self-sufficient in foodstuffs and globally ranks as 7th significant agricultural exporter in the world. Main trading partners are the European Union, the United States and the Middle East. As known, agricultural production is dependent on factors including efficient and effective use of all inputs ranging from those natural resources as in land and water to well-trained human resources as labour at the production. The socio-economic aspects of this sector take several forms ranging from the incomes of the primary producers. Rural land regulation is a necessity for rural areas and is regarded as a useful instrument for improving farmer's incomes and life standards. The irrigation system, established during the rural regulation/land consolidation period of large-scale farming, is insufficiently adjusted to the new land tenure structures. The government is especially in the process of water management with hydroelectric power plants. This process produces energy that is required but effects negatively the rivers and agricultural, environmental, climatic conditions. Rivers are vessels of the nature. Free flowing rivers give life to all nature. Most of the studies indicate that Hydroelectric Power Plants (HPP) affects the surface and ground-water management, natural life, agricultural productivity, socio-economic situation at agricultural regions and agro-life related with immigration. This study emphasizes the effect of Hydroelectric Power Plants which are used in transformation of water as a renewable natural resource into electricity power from the perspective of environmental policies and rural regulation.

  19. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10)...

  20. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10)...

  1. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10)...

  2. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. 16.19 Section 16.19....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

  3. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. 16.19 Section 16.19....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

  4. 76 FR 72196 - CRD Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission CRD Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011,...

  5. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Energy Regulatory Commission Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic Agreement Rule 2010 of the Federal Energy Regulatory Commission's... expense or improve administrative efficiency, the Secretary may establish a restricted service list for...

  6. 76 FR 58837 - Notice of Intent to Accept Proposals, Select Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Bureau of Reclamation Notice of Intent to Accept Proposals, Select Lessee, and Contract for Hydroelectric Power Development at Caballo Dam, Rio Grande Project, New Mexico AGENCY: Bureau of Reclamation,...

  7. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... necessary to adequately define impacts on the Dallas Creek Project and the environment of the development... environment. Explain any proposed use of the hydropower development for conservation and utilization of the... Bureau of Reclamation Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project,...

  8. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By...

  9. Pumped storage for hydroelectric power. (Latest citations from Fluidex data base). Published Search

    SciTech Connect

    Not Available

    1992-09-01

    The bibliography contains citations concerning the design, development, construction, and characteristics of surface and underground pumped storage for hydroelectric power. Pumped storage projects and facilities worldwide are referenced. There is some consideration of research and experimental results of pumped storage studies, as well as modeling. (Contains a minimum of 192 citations and includes a subject term index and title list.)

  10. Pumped storage for hydroelectric power. (Latest citations from Fluidex (Fluid Engineering Abstracts) database). Published Search

    SciTech Connect

    Not Available

    1993-10-01

    The bibliography contains citations concerning the design, development, construction, and characteristics of surface and underground pumped storage for hydroelectric power. Pumped storage projects and facilities worldwide are referenced. There is some consideration of research and experimental results of pumped storage studies, as well as modeling. (Contains a minimum of 198 citations and includes a subject term index and title list.)

  11. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric... of Historic Places at the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed.... Dr. James Kardatzke Bureau of Indian Affairs Eastern Regional Office 545 Marriott Drive, Suite...

  12. Development of an HTS hydroelectric power generator for the hirschaid power station

    NASA Astrophysics Data System (ADS)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  13. Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments

    SciTech Connect

    Crew, James F.; Johnson, Herbie N.

    2015-03-31

    From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

  14. Occupational allergy after exposure to caddis flies at a hydroelectric power plant.

    PubMed Central

    Kraut, A; Sloan, J; Silviu-Dan, F; Peng, Z; Gagnon, D; Warrington, R

    1994-01-01

    A cross sectional survey was conducted in a hydroelectric power plant in which the workforce was exposed to large numbers of caddis flies. 28 of 57 employees participated. About 50% of the participants reported work related eye, nose, and sinus symptoms and wheezing. Working in locations with greater exposure to caddis flies was significantly associated with work related symptoms. 17 workers (61%) were skin prick positive to a laboratory prepared caddis fly antigen (LCFA) made from the remains of caddis flies present in the plant and 11 (39%) had positive reactions to a commercial caddis fly antigen (CCFA). Workers stationed in heavily exposed areas were 3.7 times as likely to have a positive response to the LCFA (p = 0.009) and 5.3 times as likely to have a positive response to the CCFA (p = 0.036). 13 (46%) of survey respondents reported three or more work related symptoms. 10 (91%) CCFA positive workers reported three or more work related symptoms. Pulmonary function studies revealed slight, but not significantly decreased forced vital capacity (FVC), forced expiratory volume in one second (FEV1), and FEV1/FVC ratios in workers who were skin test positive to either caddis fly preparation when compared with those who were negative. One worker who was skin test positive to both antigens had a cross shift fall in FEV1 of 20% predicted. Occupational allergy to caddis flies proved to be a significant health problem at this work site. PMID:8044233

  15. Legal obstacles and incentives to the development of small scale hydroelectric power in Connecticut

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric power in Connecticut are discussed. The Federal government also exercises extensive regulatory authority in the area and this dual system is examined from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. Connecticut follows the riparian theory of water law. Under this theory of the water law, private rights in rivers and streams are confined to the use of flowing water. A riparian proprietor does not own the water that flows by his estate. Licensing, permitting, and review procedures are discussed followed by discussion on public utilities regulation and indirect considerations.

  16. Legal obstacles and incentives to the development of small scale hydroelectric power in Ohio

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. A developer must obtain title or interest to a streambed from the proper riparian owners. Ohio provides assistance to an electric company in this undertaking by providing it with the power of eminent domain in the event it is unable to reach a purchase agreement with the riparian proprietors. The Ohio Water Law is discussed in detail, followed by discussions: Licensing, Permitting, and Review Procedures; Indirect Considerations; Ohio Public Utilities Commission; Ohio Department of Energy; Incidental Provision; and Financial Considerations.

  17. Synanthropy of mosquitoes and sand flies near the Aimorés hydroelectric power plant, Brazil.

    PubMed

    Barata, R A; Ursine, R L; Nunes, F P; Morais, D H; Araújo, H S

    2012-12-01

    The environmental changes resulting from the construction of hydroelectric dams may affect the fauna of insect vectors and consequently the epidemiology of the diseases they transmit. This work examined the mosquito and sand fly fauna in the area of the Aimorés hydroelectric power plant, analyzing the seasonal distribution and the degree of species synanthropy in different ecotopes. Between November, 2008 and September, 2009, entomological captures were performed with the help of HP light traps in the rural, urban, and forest areas of Aimorés, Ituêta, Resplendor, and Baixo Guandu counties. The fauna proved to be quite diversified. Twenty-two species of mosquitoes and 11 species of sand flies were found. Culex quinquefasciatus was predominant among mosquitoes (76.7%), while Lutzomyia intermedia prevailed among sand flies (34.5%). Some of the captured species have medical interest. Supported by the high degree of synanthropy, those species reinforce the need for epidemiological surveillance. PMID:23181864

  18. Small-scale hydroelectric power in the Pacific Northwest: new impetus for an old energy source

    SciTech Connect

    Not Available

    1980-07-01

    Energy supply is one of the most important issues facing Northwestern legislators today. To meet the challenge, state legislatures must address the development of alternative energy sources. The Small-Scale Hydroelectric Power Policy Project of the National Conference of State Legislators (NCSL) was designed to assist state legislators in looking at the benefits of one alternative, small-scale hydro. Because of the need for state legislative support in the development of small-scale hydroelectric, NCSL, as part of its contract with the Department of Energy, conducted the following conference on small-scale hydro in the Pacific Northwest. The conference was designed to identify state obstacles to development and to explore options for change available to policymakers. A summary of the conference proceedings is presented.

  19. Development of a 1 D hydrodynamic habitat model for the Hippopotamus amphibious as basis for sustainable exploitation of hydroelectric power

    NASA Astrophysics Data System (ADS)

    Manful, D. Y.; Kaule, G.; Wieprecht, S.; Rees, J.; Hu, W.

    2009-12-01

    Hydroelectric Power (HEP) is proving to be a good alternative to carbon based energy. In the past hydropower especially large scale hydro attracted significant criticism as a result of its impact on the environment. A new breed of hydroelectric dam is in the offing. The aim is to have as little a footprint as possible on the environment in both pre and post construction phases and thus minimize impact on biodiversity whilst producing clean renewable energy. The Bui dam is 400 MW scheme currently under development on the Black Volta River in the Bui national park in Ghana. The reservoir created by the Bui barrage is expected to impact (through inundation) the habitat of two species of hippos know to exist in the park, the Hippopotamus amphibius and the Choeropsis liberiensis. Computer-based models present a unique opportunity to assess quantitatively the impact of the new reservoir on the habitat of the target species in this case the H. amphibious. Until this undertaking, there were very few studies documenting the habitat of the H. amphibious let alone model it. The work and subsequent presentation will show the development of a habitat model for the Hippopotamus amphibius. The Habitat Information retrieval Program based on Streamflow Analysis, in short HIPStrA, is a one dimensional (1D) in-stream, spatially explicit hybrid construct that combines physico-chemical evidence and expert knowledge to forecast river habitat suitability (Hs) for the Hippopotamus amphibius. The version of the model presented is specifically developed to assess the impact of a reservoir created by a hydroelectric dam on potential dwelling areas in the Bui gorge for hippos. Accordingly, this version of HIPStrA simulates a special reservoir suitability index (Rsi), a metric that captures the”hippo friendliness” of any lake or reservoir. The impact of measured and simulated flood events as well as low flows, representing extreme events is also assessed. Recommendations are made for the

  20. Legal obstacles and incentives to the development of small scale hydroelectric power in West Virginia

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric in West Virginia at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by FERC. The development of small-scale hydroelectric energy depends on the selection of a site which will produce sufficient water power capacity to make the project economically attractive to a developer. In West Virginia, the right to use the flowing waters of a stream, creek, or river is appurtenant to the ownership of the lands bordering the watercourse. The lands are known as riparian lands. The water rights are known as riparian rights. Thus, the first obstacle a developer faces involves the acquisition of riparian lands and the subsequent right to the use of the water. The water law in West Virginia is discussed in detail followed by discussions on direct and indirect regulations; continuing obligations; financial considerations; and interstate organizations.

  1. Legal obstacles and incentives to the development of small scale hydroelectric power in New York

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step the small scale hydroelectric developer must take is that of acquiring title to the real property comprising the development site. The real estate parcel must include the requisite interest in the land adjacent to the watercourse, access to the underlying streambed and where needed, the land necessary for an upstream impoundment area. Land acquisition may be effectuated by purchase, lease, or grant by the state. In addition to these methods, New York permits the use of the eminent domain power of the state for public utilities under certain circumstances.

  2. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Special requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section 292.208 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC...

  3. Efforts to Reduce the Impacts of Hydroelectric Power Production on Reservoir Fisheries in the United States.

    SciTech Connect

    Cada, G. F.

    1997-09-08

    Research into the environmental effects of hydroelectric power production in the United States has focused increasingly on resident and migratory fish populations. Hydropower dams and reservoirs can block fish movements in both upstream and downstream directions. These movements are essential for important stocks of anadromous and catadromous fish. In addition, some strictly freshwater fish may move long distances within a river during their life cycle.A dam can pose an impassable barrier for fish trying to move upstream unless mitigation measures in the form of ladders or lifts are provided. Fish moving downstream to the sea may become disoriented when they encounter static water within a reservoir. Both resident and migratory fish may be injured or killed by passing through the turbine or over the spillway. In the United States, a variety of organizations conduct applied research and development of measures to (1) enhance fish passage, (2) reduce the numbers of fish that are drawn into the turbine intakes, and (3) reduce the injury and mortality rates of fish that pass through the turbines. Examples of these efforts from a variety of river systems and hydroelectric power plants are described.

  4. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section 292.208 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS UNDER...

  5. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section 292.208 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS UNDER...

  6. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209 Section 292.209 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS...

  7. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209 Section 292.209 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS...

  8. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service List for a Programmatic Agreement..., the Secretary may establish a restricted service list for a particular phase or issue in a...

  9. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power Development at the Granby Dam Outlet, a Feature of the Colorado-Big Thompson (C-BT) Project, Colorado...

  10. 76 FR 22143 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Bureau of Reclamation Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a feature of the Fryingpan-Arkansas Project...

  11. A Framework for Evaluation of CORDEX Using Dam Operation Policies for the East African Hydroelectric Power Industry

    NASA Astrophysics Data System (ADS)

    Smith, K. A.; Semazzi, F. H. M.

    2014-12-01

    The productivity of hydroelectric dams along the Nile River is to a large extent determined by the level of Lake Victoria, which is primarily dictated by the rainfall and temperature variability over the lake basin. The hydrological balance of Lake Victoria is comprised of tributary inflow (15% of the water balance), rainfall over the lake (85%), evaporation from the lake (80%), and outflow from the lake (20%). The Agreed Curve Policy has been used to manage the outflow from Lake Victoria. It guarantees the natural flow of water out of the lake as if there were no dams. However, declining lake levels and population growth have resulted in chronic load shedding for residential and industrial consumers in the region, leading to the need to develop a new release policy. The development of recently proposed water release policies for the hydroelectric dams at the outlet of Lake Victoria do not thoroughly account for projected climate change. We adopt a comprehensive approach using rainfall data from multiple CORDEX models to estimate lake levels and confidence levels for two different release policies. We then compare exceedence curves for the release rule policies based on observed rainfall data for recent decades. Exceedence curves indicate vulnerability to power supply reliability. Factors affecting precipitation in individual models are examined. There is a distinct dry-wet-dry-wet pattern of annual rainfall over the Lake Victoria basin, which is evident in a comparison of precipitation from rain gauge stations used in the water balance model. Previous studies have demonstrated that this feature is determined by a combination of orographic forcing, the thermodynamics of the lake, and the interaction between the prevailing wind flow and lake-land breeze circulation. ENSO has the most influence on precipitation over the lake basin in terms of annual climatology. We evaluate the CORDEX models based on how well they reproduce these metrics in addition to how well they

  12. Design of an Adaptive Power Regulation Mechanism and a Nozzle for a Hydroelectric Power Plant Turbine Test Rig

    NASA Astrophysics Data System (ADS)

    Mert, Burak; Aytac, Zeynep; Tascioglu, Yigit; Celebioglu, Kutay; Aradag, Selin; ETU Hydro Research Center Team

    2014-11-01

    This study deals with the design of a power regulation mechanism for a Hydroelectric Power Plant (HEPP) model turbine test system which is designed to test Francis type hydroturbines up to 2 MW power with varying head and flow(discharge) values. Unlike the tailor made regulation mechanisms of full-sized, functional HEPPs; the design for the test system must be easily adapted to various turbines that are to be tested. In order to achieve this adaptability, a dynamic simulation model is constructed in MATLAB/Simulink SimMechanics. This model acquires geometric data and hydraulic loading data of the regulation system from Autodesk Inventor CAD models and Computational Fluid Dynamics (CFD) analysis respectively. The dynamic model is explained and case studies of two different HEPPs are performed for validation. CFD aided design of the turbine guide vanes, which is used as input for the dynamic model, is also presented. This research is financially supported by Turkish Ministry of Development.

  13. Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.

    SciTech Connect

    Cada, Glenn F.; Odeh, Mufeed

    2001-01-01

    The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section

  14. Small-Scale Hydroelectric Power Demonstration Project: reactivation of the Elk Rapids Hydroelectric Facility. Final technical and construction cost report

    SciTech Connect

    Not Available

    1985-05-01

    The Elk Rapids powerhouse dam is located on the Elk River channel in the Village of Elk Rapids, Michigan. Together with a small spillway structure located approximately 500 ft south of the dam, it constitutes the outlet to Lake Michigan for Elk Lake, Skegemog Lake, Torch Lake, Lake Bellaire, Clam Lake, and several smaller lakes. Power has been generated at the Elk Rapids site since the late nineteenth century, but the history of the present facility goes back to 1916 with the construction of the existing powerhouse dam by the Elk Rapids Iron Works Company. The facility was designed to contain four vertical-shaft generating units; however, only a single 270 hp Leffel type K unit was installed in 1916. In 1929, two additional Leffel units, rated 525 hp, were installed, and in 1930 a third 525 hp Leffel unit was added completely utilizing the capacity of the powerhouse and bringing the combined turbine capacity to 1845 hp.

  15. ''Rancho Hydro'': a low-head, high volume residential hydroelectric power system, Anahola, Kauai, Hawaii

    SciTech Connect

    Harder, J.D.

    1982-07-01

    The site is a 1.75 acre residential site with two households. The Anahola stream intersects the property line. Design of the proposed hydroelectric system is described, along with the permit process. Construction is in progress. (DLC)

  16. Small-scale hydroelectric power in the southeast: new impetus for an old energy source

    SciTech Connect

    Not Available

    1980-06-01

    The Southeastern conference, Small-Scale Hydroelectric Power: New Impetus for an Old Energy Source, was convened to provide a forum for state legislators and other interested persons to discuss the problems facing small-scale hydro developers, and to recommend appropriate solutions to resolve those problems. During the two-day meeting state legislators and their staffs, along with dam developers, utility and industry representatives, environmentalists and federal/state officials examined and discussed the problems impeding small-scale hydro development at the state level. Based upon the problem-oriented discussions, alternative policy options were recommended for consideration by the US Department of Energy, state legislatures and the staff of the National Conference of State Legislatures (NCSL). Emphasis was placed on the legal, institutional, environmental and economic barriers at the state level, as well as the federal delays associated with licensing small-scale hydro projects. Whereas other previously held conferences have emphasized the identification and technology of small-scale hydro as an alternative energy source, this conference stressed legislative resolution of the problems and delays in small-scale hydro licensing and development. Panel discussions and workshops are summarized. Papers on the environmental, economic, and legal aspects of small-scale hydropower development are presented. (LCL)

  17. Determination of the Environmental Impacts of Hydroelectric Power Plants (HPP) in Black sea Region of Turkey Using Remotely Sensed Data

    NASA Astrophysics Data System (ADS)

    Seker, D. Z.; Kochan, N.; Denli, H. H.; Alganci, U.; kaya, S.; Sertel, E.

    2013-12-01

    Hydroelectric power plants have several environmental effects on their environment. The dam itself and its reservoir cause important changes in land cover at the related watershed. Mainly these changes occur as transform from forest and agricultural lands to bare lands and dam construction. It is important to monitor the land cover changes after the construction to understand the impacts of HPP on the ecology of basin. Remote sensing satellites serve as valuable tools for monitoring such changes with their capability of acquiring large areas multi-temporally. Classification of the pre and post satellite images can produce the land cover change information and its spatial distribution. Such kind of analysis will also help to determine the transformation between land cover types which is valuable information for interpreting the ecological impacts. Study focused on determination of the land cover changes in the different river watersheds of the Black Sea Region, Turkey, where a HPP construction was densely occurred. To investigate the changes around the HPP, High resolution satellite images belonging to 2009 and 2012 were used and analyzed with classification method in order to analyze the land cover changes and transformations between land cover types. Results were interpreted in terms of possible ecological impact aspects.

  18. The Effects of Run-of-River Hydroelectric Power Schemes on Fish Community Composition in Temperate Streams and Rivers.

    PubMed

    Bilotta, Gary S; Burnside, Niall G; Gray, Jeremy C; Orr, Harriet G

    2016-01-01

    The potential environmental impacts of large-scale storage hydroelectric power (HEP) schemes have been well-documented in the literature. In Europe, awareness of these potential impacts and limited opportunities for politically-acceptable medium- to large-scale schemes, have caused attention to focus on smaller-scale HEP schemes, particularly run-of-river (ROR) schemes, to contribute to meeting renewable energy targets. Run-of-river HEP schemes are often presumed to be less environmentally damaging than large-scale storage HEP schemes. However, there is currently a lack of peer-reviewed studies on their physical and ecological impact. The aim of this article was to investigate the effects of ROR HEP schemes on communities of fish in temperate streams and rivers, using a Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 23 systematically-selected ROR HEP schemes and 23 systematically-selected paired control sites. Six area-normalised metrics of fish community composition were analysed using a linear mixed effects model (number of species, number of fish, number of Atlantic salmon-Salmo salar, number of >1 year old Atlantic salmon, number of brown trout-Salmo trutta, and number of >1 year old brown trout). The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the number of species. However, no statistically significant effects were detected on the other five metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future fish community impact studies. PMID:27191717

  19. The Effects of Run-of-River Hydroelectric Power Schemes on Fish Community Composition in Temperate Streams and Rivers

    PubMed Central

    2016-01-01

    The potential environmental impacts of large-scale storage hydroelectric power (HEP) schemes have been well-documented in the literature. In Europe, awareness of these potential impacts and limited opportunities for politically-acceptable medium- to large-scale schemes, have caused attention to focus on smaller-scale HEP schemes, particularly run-of-river (ROR) schemes, to contribute to meeting renewable energy targets. Run-of-river HEP schemes are often presumed to be less environmentally damaging than large-scale storage HEP schemes. However, there is currently a lack of peer-reviewed studies on their physical and ecological impact. The aim of this article was to investigate the effects of ROR HEP schemes on communities of fish in temperate streams and rivers, using a Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 23 systematically-selected ROR HEP schemes and 23 systematically-selected paired control sites. Six area-normalised metrics of fish community composition were analysed using a linear mixed effects model (number of species, number of fish, number of Atlantic salmon—Salmo salar, number of >1 year old Atlantic salmon, number of brown trout—Salmo trutta, and number of >1 year old brown trout). The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the number of species. However, no statistically significant effects were detected on the other five metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future fish community impact studies. PMID:27191717

  20. Fish passage mitigation of impacts from hydroelectric power projects in the United States

    SciTech Connect

    Cada, G.F.

    1996-10-01

    Obstruction of fish movements by dams continues to be the major environmental issue facing the hydropower industry in the US. Dams block upstream migrations, which can cut off adult fish form their historical spawning grounds and severely curtail reproduction. Conversely, downstream-migrating fish may be entrained into the turbine intake flow and suffer turbine-passage injury or mortality. Hydroelectric projects can interfere with the migrations of a wide variety of fish. Maintenance, restoration or enhancement of populations of these species may require the construction of facilities to allow for upstream and downstream fish passage. The Federal Energy Regulatory Commission (FERC), by law, must give fish and wildlife resources equal consideration with power production in its licensing decisions, must be satisfied that a project is consistent with comprehensive plans for a waterway (including fisheries management plans), and must consider all federal and state resource agency terms and conditions for the protection of fish and wildlife. As a consequence, FERC often requires fish passage mitigation measures as a condition of the hydropower license when such measures are deemed necessary for the protection of fish. Much of the recent research and development efforts of the US Department of Energy`s Hydropower Program have focused on the mitigation of impacts to upstream and downstream fish passage. This paper descries three components of that effort: (1) a survey of environmental mitigation measures at hydropower sites across the country; (2) a critical review of the effectiveness of fish passage mitigation measures at 16 case study sites; and (3) ongoing efforts to develop new turbine designs that minimize turbine-passage mortality.

  1. Legal obstacles and incentives to the development of small scale hydroelectric power in Pennsylvania

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Pennsylvania, there are 3 methods by which rights in water may be acquired: riparian ownership, prescription, and condemnation. These are discussed.

  2. New social movements and political process: The politics of hydroelectric power in Switzerland

    NASA Astrophysics Data System (ADS)

    Lehmann, Luzia M.

    This dissertation analyzes the mobilization and impact of the ecology movement mobilizing against and challenging hydroelectric power plants in the Alps. It argues that the political process model is the most fruitful framework for such a study, linking a political system's structural constraints and opportunities to movement action via organizational resources. The mobilization process resulting in movement impact is conceived as an interactive process among social movements, authorities, other opponents, and potential counter movements. The case study method is then used to analyze three action campaigns launched against hydro power plants in Graubunden since the 1970s: Ilanz I and II, Greina, and Curciusa. In terms of the movement's narrow goal of preventing a plant, Ilanz I and II is a failure, Greina a success, and Curciusa ambiguous. Yet the author defines movement impact more broadly, including procedural, reactive and proactive substantive impact, and structural impact, changes in the alliance/conflict system, and social learning. Based on the evidence from the case studies, these factors affect movement outcome positively: visibility in the media and framing the debate, adjusting the target level and movement repertoire to the opportunity structure and the spatial concentration of the issue, proactivity, and organizational resources with a well developed division of labor, internal communication, and a non-partisan alliance system at all levels. There are two main conceptual contributions. First, the author analyzes the political opportunity structure at all levels of the federal polity--the national, cantonal, and communal--as well as the interplay among the levels. The fact that the cantonal and communal levels exhibit more elements of closure than the national level helps explain differences in movements' organizational resources, movement repertoire, targeting of movement action, and thus movement impact. Second, the author develops the spatial

  3. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... civil works field operating agencies (FOA) having generating facilities producing marketable electric.... 534, 78th Congress), provides that electric power and energy generated at reservoir projects under the... coordinating the exchange of information may be delegated to the District Engineer at the discretion of...

  4. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... civil works field operating agencies (FOA) having generating facilities producing marketable electric.... 534, 78th Congress), provides that electric power and energy generated at reservoir projects under the... coordinating the exchange of information may be delegated to the District Engineer at the discretion of...

  5. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... civil works field operating agencies (FOA) having generating facilities producing marketable electric.... 534, 78th Congress), provides that electric power and energy generated at reservoir projects under the... coordinating the exchange of information may be delegated to the District Engineer at the discretion of...

  6. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... civil works field operating agencies (FOA) having generating facilities producing marketable electric.... 534, 78th Congress), provides that electric power and energy generated at reservoir projects under the... coordinating the exchange of information may be delegated to the District Engineer at the discretion of...

  7. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: South Columbia Basin Irrigation District, Pasco, Washington

    SciTech Connect

    Schwartz, L.

    1980-05-01

    The case study concerns two modern human uses of the Columbia River - irrigation aimed at agricultural land reclamation and hydroelectric power. The Grand Coulee Dam has become synonomous with large-scale generation of hydroelectric power providing the Pacific Northwest with some of the least-expensive electricity in the United States. The Columbia Basin Project has created a half-million acres of farmland in Washington out of a spectacular and vast desert. The South Columbia River Basin Irrigation District is seeking to harness the energy present in the water which already runs through its canals, drains, and wasteways. The South District's development strategy is aimed toward reducing the costs its farmers pay for irrigation and raising the capital required to serve the remaining 550,000 acres originally planned as part of the Columbia Basin Project. The economic, institutional, and regulatory problems of harnessing the energy at site PEC 22.7, one of six sites proposed for development, are examined in this case study.

  8. Legal obstacles and incentives to the development of small-scale hydroelectric power in Rhode Island

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Rhode Island, any private rights in the flowing waters of a river or stream depend upon ownership of the abutting land. It appears Rhode Island follows the reasonable use theory of riparian law. The Department of Environmental Management is the most significant administrative agency with regard to dam construction, alteration, and operation in the state of Rhode Island.

  9. Legal obstacles and incentives to the development of small scale hydroelectric power in Indiana

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy in Indiana are examined. The Federal government also exercises extensive regulatory authority in the area. An examination is made of the Federal-state relationships with the aim of creating a more orderly understanding of the vagaries of the system. The introductory chapter examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. The Indiana water law; direct and indirect regulations; the Public Service Commission of Indiana; and financial considerations are examined.

  10. Toward new institutional relationships in the development of small scale hydroelectric power

    SciTech Connect

    Brown, P.W.

    1980-12-01

    This paper will briefly discuss three principle subjects. These subjects are recent changes in hydroelectric licensing, provisions of the Public Utility Regulatory Policies Act of 1978 (PURPA) and the regulations promulgated pursuant to the Act by the Federal Energy Regulatory Commission (FERC) and Sections 221 and 222 (e), and Section 242 of the Crude Oil Windfall Profit Tax Act of 1980. The FERC has recently reformed its licensing and permit regulations and Congress has enacted Section 408 of the Energy Security Act to exempt certain projects from the FERC licensing. PURPA and the FERC regulations promulgated pursuant thereto guarantee markets for the output of small scale hydroelectric (SSH) plants and the provisions of the Windfall Profit Tax Act measurably assist in the raising of capital for the construction of SSH facilities. All three incentives are significant given the electric utility markets confronted by SSH developers and the capital intensive nature of SSH projects.

  11. Hydroelectric power generation in an Alpine basin: future water-energy scenarios in a run-of-the-river plant

    NASA Astrophysics Data System (ADS)

    Bongio, Marco; Avanzi, Francesco; De Michele, Carlo

    2016-08-01

    We investigate scenarios of hydroelectric power generation for an Alpine run-of-the-river plant in 2050. To this end, we include a conversion from streamflow to energy in a hydrological model of the basin, and we introduce a set of benchmark climate scenarios to evaluate expected future production. These are a "future-like-present" scenario assuming future precipitation and temperature inputs to be statistically equivalent to those observed during the recent past at the same location, a "warmer-future" scenario, which considers an additional increase in temperature, and a "liquid-only" scenario where only liquid precipitation is admitted. In addition, two IPCC-like climatic scenarios (RCP 4.5 and RCP 8.5) are considered. Uncertainty in glaciers' volume is accounted by initializing the hydrological model with two different inventories of glaciers. Ensemble results reveal that 1) an average decrease between -40% and -19% of hydroelectric power generation in 2050 is predicted at the plant considered (with respect to present condition); 2) an average decrease between -20% and -38% of cumulative incoming streamflow volume at the plant is also predicted, again with respect to present condition; 3) these effects are associated with a strong average decrease of the volume of glaciers (between -76% and -96%, depending on the initial value considered). However, Monte Carlo simulations show that results are also prone to high uncertainties. Implications of these results for run-of-the-river plants are discussed.

  12. New York State Electric and Gas Corporation Upper Mechanicville hydroelectric redevelopment project: final operation and maintenance report. Small-Scale Hydroelectric Power Demonstration Project

    SciTech Connect

    Not Available

    1985-11-01

    The Upper Mechanicville Project, the first hydroelectric plant to be developed in recent years by NYSEG, is located at Dam and Lock No. C-3 on the West Bank of the Hudson River about 20 miles upstream from Albany and is part of the Champlain Barge Canal navigation system. As of August 1985, both units have completed two full years of operation. Initially both units required warranty work. Since completion of warranty work, both units have operated exceptionally well and virtually troublefree.

  13. Kansas hydro-power: an assessment of low-head hydroelectric opportunities

    SciTech Connect

    Hochstetler, T.; Noon, R.

    1981-01-02

    The results of a recent survey of existing dams in Kansas to determine their respective development potentials for hydroelectricity generation are described. Of over 5000 dams in Kansas, 34 were found to have potential for commercial development based upon such parameters as head height, flow rate, seasonal flow variations, and present state of repair. These 34 sites together could potentially produce 394 million kilowatt-hours of renewable resource derived electricity, about 1.5% of the electricity generated in Kansas in 1979. While statewide this would be a modest contribution, it could play an important role in local energy management.

  14. Legal obstacles and incentives to the development of small scale hydroelectric power in Delaware

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Delaware, a watercourse is not to be confused with surface water. Each gives rise to certain riparian rights, but the law makes certain distinctions between the two. The presence of both surface waters and watercourses give rise to private and public rights related to the presence of the water. Some of these rights are vested in riparian owners. Recent Delaware case law has described the riparian owner as one who owns land on the bank of a river, or who is owner of land along, bordering upon, bounded by, fronting upon, abutting, or adjacent and contiguous to and in contact with a river. But, ownership of the bank does not give the riparian ownership of the water. Some law cases are cited to discuss the laws in Delaware.

  15. Legal obstacles and incentives to the development of small-scale hydroelectric power in Virginia

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy in Virginia are described. The state regulatory system does not comprise final authority; the Federal government also exercises extensive regulatory authority in the area. This dual system is a function of the federalist nature of our government. The introductory section examines the dual system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and inquires into the practical use of the doctrine by the FERC. The use of a natural-surface watercourse in Virginia is governed generally by the doctrine of riparian rights. Riparian rights is a system of water rights based on ownership of land bordering on a natural stream or watercourse. For land to be considered riparian to a stream, that land must be located on the watershed of that portion of the stream. The theory of riparian rights followed in Virginia is one of reasonable use. Under the reasonable-use doctrine, each riparian owner has an equal right to the reasonable use of the water running naturally through or by his land for any useful purpose. The water must continue to run after such use without material diminution or alteration and without pollution.

  16. Legal obstacles and incentives to the development of small scale hydroelectric power in New Hampshire

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are described. The Federal government also exercises extensive regulatory authority in the area and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step any developer must take is that of acquiring the real estate parcel. The step involves acquisition in some manner of both river banks, the river bed, and where necessary the land needed for the upstream impoundment area. The developer must acquire the river banks to be considered a riparian owner. Classification as a riparian is important for only a use of water by a riparian owner is deemed a reasonable use and hence legal. Apart from acquisition by sale, lease, or gift, New Hampshire law permits a number of other methods. In part use of these methods will depend on whether the developer is the state, a municipality, a private corporation, or a public utility. Provided the developer avails himself of the five (5) megawatts exemption, his main regulatory agency will be the Water Resources Board. However, the state is not free from the problems of legal uncertainty inherent in determinations of reasonableness.

  17. Legal obstacles and incentives to the development of small scale hydroelectric power in Maryland

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maryland are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined with the aim of creating a more orderly understanding of the vagaries of the system, focusing on the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. In Maryland, by common law rule, title to all navigable waters and to the soil below the high-water mark of those waters is vested in the state as successor to the Lord Proprietary who had received it by grant from the Crown. Rights to non-navigable water, public trust doctrine, and eminent domain are also discussed. Direct and indirect regulations, continuing obligations, loan programs, and regional organizations are described in additional sections.

  18. Legal obstacles and incentives to the development of small scale hydroelectric power in Vermont

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Vermont are discussed. The dual regulatory system involving state and Federal governments is discussed followed by discussions on property interests; direct regulation by the Public Service Board; indirect regulation; and financial considerations. An initial step required of any developer is that of real property acquisition. Ordinarily this involves acquiring the stream bed, land along the stream banks, and land needed for the impoundment reservoir. Ownership of land along the stream banks places the developer in the position of a riparian owner. This status is important in that only riparian owners are entitled to a reasonable use of the flowing water. In addition to acquisition by sale, lease, or gift, Vermont law allows certain developers to acquire property via eminent domain. Some general rules which have evolved as riparian law and applied in Vermont are discussed.

  19. Active tectonics and Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (NW Himalaya, India)

    NASA Astrophysics Data System (ADS)

    Draganits, Erich; Grasemann, Bernhard; Gier, Susanne; Hofmann, Christa-Charlotte; Janda, Christoph; Bookhagen, Bodo; Preh, Alexander

    2015-04-01

    The Baspa River is one of the most important tributaries to the Sutlej River in the NW Himalaya (India). Its catchment is 1116 km2 in size, ranges from c. 6400 m asl to 1770 m asl and contains India's largest private hydroelectric facility, the 300 MW Baspa II. Geologically, the hydroelectric installation is located in the Higher Himalayan Crystalline, just above the active Karcham Normal Fault, which is reactivating the Early Miocene Main Central Thrust, one of the principal Himalayan faults. The area is seismically active and mass-movements are common. Around 8200 yrs BP the Baspa was dammed by a rock-avalanche dam, leading to the formation of the originally c. 260 m deep palaeo-lake Sangla palaeo-lake. Detailed sedimentological investigations and radiocarbon dating indicate that the palaeo-lake was completely filled with sediments until c. 5100 yrs BP. This makes the Sangla palaeo-lake to a very rare example of a mass-movement dam with very long duration and its lacustrine sediments represent a valuable archive for geological processes and environmental proxies within the Baspa catchment during the c. 3100 years of its existence - which are the aim of our study. At least 5 levels of soft-sediment deformation have been recorded in the exposed part of the lacustrine sediments of Sangla palaeo-lake, including brecciated laminae, overturned laminae, folds, faults and deformation bands, separated by undeformed deposits. They are interpreted as seismites, indicating at least 5 earthquakes within 2500 years strong enough to cause liquefaction. The 300 MW Baspa II hydro-electric power plant has been built exactly on top of this palaeo-lake. This special location represents a very rare possibility to evaluate the short-term, river load and hydrological parameters measured during the planning and operational stages of Baspa II with the long-term parameters gained from the palaeo-lake sediments from the catchment. This data show that the Mid-Holocene erosion rates of the

  20. Development of a twin-flapping-foils unit to generate hydroelectric power from a water current

    NASA Astrophysics Data System (ADS)

    Abiru, H.; Yoshitake, A.; Nishi, M.

    2014-03-01

    Most of the conventional hydraulic turbines have been used for those sites having the static head larger than around 1 m. To extensively utilize not only large hydro-power but small one, which is one of renewable energy resources, development of an energy conversion system being operable under an extremely low head stream is crucial. A twin-flapping-foils unit which works based on the lift acting on the flapping foils in a stream is proposed. The foils oscillate in the transverse direction of the flow due to the lift. The pitching motion of the foils is caused by their own transverse movement through the mechanism consisting of crankshafts and con-rods. In the unit, each foil is supported vertically with a shaft in a manner of a cantilever so that no other parts need to be submerged in a water current. An experimental model with symmetric foils of 100 mm chord and 300 mm span was designed to generate average power output of 10 W at a flow velocity of 1 m/s. Through the tests carried out in the circulating water channel, the performance of the unit was verified to satisfy the design specifications. Further, the demonstration tests by using an irrigation stream performed for over a half year clarified the performance equivalent to that in the in-door water channel and the durability to a certain extent, and showed the applicability to the practical use of lighting a LED street lamp during night even at this scale model.

  1. Hydrodynamic optimization of trust ring pump and lubricating oil system for large hydroelectric units thrust bearing

    NASA Astrophysics Data System (ADS)

    Lai, X.; Lu, Z.; Zhang, X.; Yang, S.

    2014-03-01

    Thrust-ring-pump is a kind of extreme-low specific speed centrifugal pump with special structure as numerous restrictions form thrust bearing and operation conditions of hydro turbine generator unit. Because the oil circulating and cooling system with thrust-ring- pump has a lot of advantages in maintenance and compactness in structure, it has widely been used in large and medium-sized hydro-generator units. Since the diameter and the speed of the thrust ring is limited by the generator set, the matching relationship between the flow passage inside the thrust ring (equivalent to impeller) and oil bath (equivalent to volute) has great influence on hydrodynamic performance of thrust-ring-pump, additionally, the head and discharge are varying with the operation conditions of hydro-generator unit and characteristic of the oil circulating and cooling system. As so far, the empirical calculation method is employed during the actual engineering design, in order to guarantee the operating performance of the oil circulating and cooling system with thrust-ring-pump at different conditions, a collaborative hydrodynamic design and optimization of both the oil circulating and cooling system and thrust-ring-pump is purposed in this paper. Firstly, the head and discharge required at different conditions are decided by 1D flow numerical simulation of the oil circulating and cooling system. Secondly, the flow passages of thrust-ring-pump are empirically designed under the restrictions of diameter and the speed of the thrust ring according to the head and discharge from the simulation. Thirdly, the flow passage geometry matching optimization between holes inside the thrust ring and oil bath is implemented by means of 3D flow simulation and performance prediction. Then, the pumps and the oil circulating and cooling system are collaborative hydrodynamic optimized with predicted head- discharge curve and the efficiency-discharge curve of thrust-ring-pump. The presented methodology has

  2. Non-uniform composite representation of hydroelectric systems for long-term hydrothermal scheduling

    SciTech Connect

    Cruz, G. da Jr.; Soares, S.

    1995-12-31

    This paper presents a non-uniform composite representation of hydroelectric systems for use in long-term hydrothermal scheduling. This representation was developed from reservoir operational rules based on optimal reservoir trajectories obtained with a deterministic hydrothermal scheduling algorithm. A test system consisting of {tau} large hydroelectric plants of the Southeast Brazilian Power System with 12,572 MW of installed power capacity was selected for a case study. Operational cost comparisons with the classical uniform composite representation reveal significant savings.

  3. Evaluation of melioration area damage on the river Danube caused by the hydroelectric power plant 'Djerdap 1' backwater.

    PubMed

    Pajic, P; Andjelic, L; Urosevic, U; Polomcic, D

    2014-01-01

    Construction of the hydroelectric power plant (HPP) 'Djerdap 1' formed a backwater effect on the Danube and its tributaries, which had an inevitable influence on groundwater level, causing it to rise and thus creating additional threats to all melioration areas on more than 300 km of the Danube riversides, as well as on the riversides of its tributaries: the Sava (100 km) and the Tisa (60 km). In this paper, the HPP 'Djerdap 1' backwater effect on some characteristic melioration areas (34 in all) has been analyzed. In most of these areas intensive agricultural activity has always been present. An assessment of agricultural production damage was carried out by complex hydrodynamic calculations (60 calculation profiles) for different backwater regimes, with the aim to precisely quantify the HPP 'Djerdap 1' backwater effect on groundwater piezometric levels. Combining them with complex agroeconomic analyses, the aim is to quantify agricultural production damage and to consider the perspective of melioration area users. This method, which combines two different, but compatible, aspects of the melioration area threat assessment (hydrodynamic and agroeconomic), may present a quality base for further agricultural production threat assessment on all melioration areas on the Danube riversides, with the final aim to consider the economic effects and the importance of its further protection. PMID:25051487

  4. Effect of geodynamics on the reliability of the dam behind the Chirkey hydroelectric power plant

    SciTech Connect

    Marchuk, A.N.; Misrikhanov, M.S.; Abakarov, A.R.

    1994-11-01

    The chirkey hydraulic facility is located in the territory of one of the most seismically active sections of the Caucasus - the Dagestan wedge seismofocal region (SFR). Large-scale paleoseismodeformations have been observed here, and a series of destructive earthquakes with magnitudes of 5.3-6.7 and intensities of 7-8 ponts occurred in 1970 through 1976.

  5. The urgency of assessing the greenhouse gas budgets of hydroelectric reservoirs in China

    NASA Astrophysics Data System (ADS)

    Hu, Yuanan; Cheng, Hefa

    2013-08-01

    Already the largest generator of hydroelectricity, China is accelerating dam construction to increase the share of hydroelectricity in its primary energy mix to reduce greenhouse gas emissions. Here, we review the evidence on emissions of GHGs, particularly methane, from the Three Gorges Reservoir, and argue that although the hydroelectric reservoirs may release large amounts of methane, they contribute significantly to greenhouse gas reduction by substitution of thermal power generation in China. Nonetheless, more systematic monitoring and modelling studies on greenhouse gas emissions from representative reservoirs are necessary to better understand the climate impact of hydropower development in China.

  6. 78 FR 48185 - Notice of Intent To Contract for Hydroelectric Power Development on the San Juan-Chama Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... content guidelines, and information concerning selection of a non-Federal entity to develop hydroelectric... of all benefits and the costs of the hydropower development. Selection of Lessee Proposals will be... proposal is at least as well adapted to developing, conserving, and utilizing the water and...

  7. Analysis of large power systems

    NASA Technical Reports Server (NTRS)

    Dommel, H. W.

    1975-01-01

    Computer-oriented power systems analysis procedures in the electric utilities are surveyed. The growth of electric power systems is discussed along with the solution of sparse network equations, power flow, and stability studies.

  8. Erosion Control and Recultivation Measures at a Headrace Channel of a Hydroelectric Power Plant using Different Combined Soil Bioengineering Techniques

    NASA Astrophysics Data System (ADS)

    Obriejetan, M.; Florineth, F.; Rauch, H. P.

    2012-04-01

    vegetation properties are studied by setting up comparative test plots at a field study site located at a headrace channel of a hydroelectric power plant. Different vegetational parameters such as basal coverage, species richness, species composition, abundance/dominance values by using a refined Braun-Blanquet cover estimation scale were collected as well as local environmental properties. Results during the first vegetation period show distinct effects of geotextiles especially on overall vegetation coverage and grasses-herbs-ratio. Geotextile supported plots show 20% higher overall coverage but lower amount of herbs after three months of vegetation growth compared to control plots without installation of auxiliary materials. Furthermore coir blankets reveal higher penetration resistance for seed leaves of herbal plants compared to coir nettings. Hence technical erosion protection products, biological components and it's combination have to be closely coordinated in order to achieve specified revegetation objectives and meet long-term functionality.

  9. The Impacts of Wind Speed Trends and 30-Year Variability in Relation to Hydroelectric Reservoir Inflows on Wind Power in the Pacific Northwest

    PubMed Central

    Cross, Benjamin D.; Kohfeld, Karen E.; Bailey, Joseph; Cooper, Andrew B.

    2015-01-01

    In hydroelectric dominated systems, the value and benefits of energy are higher during extended dry periods and lower during extended or extreme wet periods. By accounting for regional and temporal differences in the relationship between wind speed and reservoir inflow behavior during wind farm site selection, the benefits of energy diversification can be maximized. The goal of this work was to help maximize the value of wind power by quantifying the long-term (30-year) relationships between wind speed and streamflow behavior, using British Columbia (BC) and the Pacific Northwest (PNW) as a case study. Clean energy and self-sufficiency policies in British BC make the benefits of increased generation during low streamflow periods particularly large. Wind density (WD) estimates from a height of 10m (North American Regional Reanalysis, NARR) were correlated with cumulative usable inflows (CUI) for BC (collected from BC Hydro) for 1979–2010. The strongest WD-CUI correlations were found along the US coast (r ~0.55), whereas generally weaker correlations were found in northern regions, with negative correlations (r ~ -0.25) along BC’s North Coast. Furthermore, during the lowest inflow years, WD anomalies increased by up to 40% above average values for the North Coast. Seasonally, high flows during the spring freshet were coincident with widespread negative WD anomalies, with a similar but opposite pattern for low inflow winter months. These poorly or negatively correlated sites could have a moderating influence on climate related variability in provincial electricity supply, by producing greater than average generation in low inflow years and reduced generation in wet years. Wind speed and WD trends were also analyzed for all NARR grid locations, which showed statistically significant positive trends for most of the PNW and the largest increases along the Pacific Coast. PMID:26271035

  10. The Impacts of Wind Speed Trends and 30-Year Variability in Relation to Hydroelectric Reservoir Inflows on Wind Power in the Pacific Northwest.

    PubMed

    Cross, Benjamin D; Kohfeld, Karen E; Bailey, Joseph; Cooper, Andrew B

    2015-01-01

    In hydroelectric dominated systems, the value and benefits of energy are higher during extended dry periods and lower during extended or extreme wet periods. By accounting for regional and temporal differences in the relationship between wind speed and reservoir inflow behavior during wind farm site selection, the benefits of energy diversification can be maximized. The goal of this work was to help maximize the value of wind power by quantifying the long-term (30-year) relationships between wind speed and streamflow behavior, using British Columbia (BC) and the Pacific Northwest (PNW) as a case study. Clean energy and self-sufficiency policies in British BC make the benefits of increased generation during low streamflow periods particularly large. Wind density (WD) estimates from a height of 10m (North American Regional Reanalysis, NARR) were correlated with cumulative usable inflows (CUI) for BC (collected from BC Hydro) for 1979-2010. The strongest WD-CUI correlations were found along the US coast (r ~0.55), whereas generally weaker correlations were found in northern regions, with negative correlations (r ~ -0.25) along BC's North Coast. Furthermore, during the lowest inflow years, WD anomalies increased by up to 40% above average values for the North Coast. Seasonally, high flows during the spring freshet were coincident with widespread negative WD anomalies, with a similar but opposite pattern for low inflow winter months. These poorly or negatively correlated sites could have a moderating influence on climate related variability in provincial electricity supply, by producing greater than average generation in low inflow years and reduced generation in wet years. Wind speed and WD trends were also analyzed for all NARR grid locations, which showed statistically significant positive trends for most of the PNW and the largest increases along the Pacific Coast. PMID:26271035

  11. Financing of private small scale hydroelectric projects: a summary guide

    SciTech Connect

    Not Available

    1981-05-01

    Small-scale hydroelectric (SSH) projects are increasingly being supported financially by private developers. Increases in fossil fuel prices, difficulties in the siting of large power plants, streamlining of the federal licensing process, changes in the marketing of power, and the extension of tax credits-all contribute to expectations of profitability in SSH projects. This document provides an overview of private financing for SSH projects.

  12. Fall Chinook Salmon Spawning Activity Versus Daylight and Flow in the Tailrace of a Large Hydroelectric Dam

    SciTech Connect

    McMichael, Geoffrey A.; McKinstry, Craig A.; Vucelick, Jessica A.; Lukas, Joe

    2005-05-01

    We deployed an acoustic system during the fall Chinook salmon (Oncorhynchus tshawytscha) spawning season in 2001 to determine whether fall Chinook salmon spawning activity in a hydroelectric dam tailrace area was affected by daylight or river flow dynamics. The system was deployed following a randomized study design to record fall Chinook salmon spawning activity during day and night periods in two index areas downstream of Wanapum Dam on the Columbia River in Washington, USA. One index area was a deepwater spawning area located (river kilometer (rkm) 663) in 9 to 11 m of water. The other index site was a moderate depth mid-channel bar, where water depths ranged from 2.5 to 6 m. The acoustic system was used to collect spawning activity data during free-drifts in a boat through the index areas. Spawning activity was defined as digs per minute from underwater sound recordings. Fall Chinook salmon spawning activity in the Wanapum Dam tailrace was influenced by daylight and river discharge. Results showed there was a substantial amount of spawning activity occurring during both daylight and darkness. However, there was significantly more spawning activity during daylight than at night in both index areas. Spawning activity was also affected by flow. Project discharge had a pronounced non-linear effect on spawning activity. Spawning activity was generally highest at project discharges between 1,700 and 2266 m3 sec-1 in both spawning areas, with reduced activity as discharge increased to between 3,400 and 4,250 m3 sec-1. We concluded that fall Chinook salmon spawning activity in highly variable environments was affected more by flow (and velocity) than by daylight.

  13. Power quality load management for large spacecraft electrical power systems

    NASA Technical Reports Server (NTRS)

    Lollar, Louis F.

    1988-01-01

    In December, 1986, a Center Director's Discretionary Fund (CDDF) proposal was granted to study power system control techniques in large space electrical power systems. Presented are the accomplishments in the area of power system control by power quality load management. In addition, information concerning the distortion problems in a 20 kHz ac power system is presented.

  14. The impacts of wind power integration on sub-daily variation in river flows downstream of hydroelectric dams.

    PubMed

    Kern, Jordan D; Patino-Echeverri, Dalia; Characklis, Gregory W

    2014-08-19

    Due to their operational flexibility, hydroelectric dams are ideal candidates to compensate for the intermittency and unpredictability of wind energy production. However, more coordinated use of wind and hydropower resources may exacerbate the impacts dams have on downstream environmental flows, that is, the timing and magnitude of water flows needed to sustain river ecosystems. In this paper, we examine the effects of increased (i.e., 5%, 15%, and 25%) wind market penetration on prices for electricity and reserves, and assess the potential for altered price dynamics to disrupt reservoir release schedules at a hydroelectric dam and cause more variable and unpredictable hourly flow patterns (measured in terms of the Richards-Baker Flashiness (RBF) index). Results show that the greatest potential for wind energy to impact downstream flows occurs at high (∼25%) wind market penetration, when the dam sells more reserves in order to exploit spikes in real-time electricity prices caused by negative wind forecast errors. Nonetheless, compared to the initial impacts of dam construction (and the dam's subsequent operation as a peaking resource under baseline conditions) the marginal effects of any increased wind market penetration on downstream flows are found to be relatively minor. PMID:25061693

  15. Underground pumped hydroelectric storage

    NASA Astrophysics Data System (ADS)

    Allen, R. D.; Doherty, T. J.; Kannberg, L. D.

    1984-07-01

    Underground pumped hydroelectric energy storage was conceived as a modification of surface pumped storage to eliminate dependence upon fortuitous topography, provide higher hydraulic heads, and reduce environmental concerns. A UPHS plant offers substantial savings in investment cost over coal-fired cycling plants and savings in system production costs over gas turbines. Potential location near load centers lowers transmission costs and line losses. Environmental impact is less than that for a coal-fired cycling plant. The inherent benefits include those of all pumped storage (i.e., rapid load response, emergency capacity, improvement in efficiency as pumps improve, and capacity for voltage regulation). A UPHS plant would be powered by either a coal-fired or nuclear baseload plant. The economic capacity of a UPHS plant would be in the range of 1000 to 3000 MW. This storage level is compatible with the load-velocity requirements of a greater metropolitan area with population of 1 million or more.

  16. Large autonomous spacecraft electrical power system (LASEPS)

    NASA Technical Reports Server (NTRS)

    Dugal-Whitehead, Norma R.; Johnson, Yvette B.

    1992-01-01

    NASA - Marshall Space Flight Center is creating a large high voltage electrical power system testbed called LASEPS. This testbed is being developed to simulate an end-to-end power system from power generation and source to loads. When the system is completed it will have several power configurations, which will include several battery configurations. These configurations are: two 120 V batteries, one or two 150 V batteries, and one 250 to 270 V battery. This breadboard encompasses varying levels of autonomy from remote power converters to conventional software control to expert system control of the power system elements. In this paper, the construction and provisions of this breadboard are discussed.

  17. 78 FR 28826 - Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One, LLC; Notice of Application for Transfer of License, and Soliciting Comments...

  18. Analysis of legal obstacles and incentives to the development of low-head hydroelectric power in Maine

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maine is discussed. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined. The first step any developer of small-scale hydropower must take is to acquire right, title, or interest in the real property. In Maine, that step requires acquisition in some form of both river banks, the river bed, and where necessary, the land needed for the upstream impoundment area. The developer must acquire the river banks to be considered a riparian owner. Classification as a riparian is important, for only a use of water by a riparian owner is deemed a reasonable use and hence a legal use. A non-riparian could not draw water from a stream to increase the water level of an impoundment area on another stream. Apart from the usual methods of land acquisition involving sale, lease, or perhaps gift, Maine has two somewhat unique methods a developer may use for property acquisition. These methods, authorized by statute, are use of the abandoned dams law and use of the Mill Dam Act for flowage of upstream impoundment areas.

  19. Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (India, NW Himalaya)

    NASA Astrophysics Data System (ADS)

    Draganits, Erich; Gier, Susanne; Hofmann, Christa-Ch.; Janda, Christoph; Bookhagen, Bodo; Grasemann, Bernhard

    2014-08-01

    300 MW Baspa II is India's largest private hydroelectric facility, located at the Baspa River which is an important left-hand tributary to the Sutlej River in the NW Himalaya (India). In this valley the Sangla palaeo-lake has been dammed around 8200 yr BP behind a rock-avalanche dam and Baspa II is located exactly on top of this palaeo-lake. This special location represents a very rare possibility to evaluate the short-term, river load and hydrological parameters measured during the planning and operational stages of Baspa II with the long-term parameters gained from the palaeo-lake sediments from the catchment. Sedimentological and geomorphological investigations of the lacustrine sediments have been used to reconstruct environmental changes during >2500 years of its existence. The Mid-Holocene erosion rates of the Baspa catchment estimated from the volume and duration of deposition of the exposed lake sediments are at 0.7-1.0 mm yr-1, almost identical with the modern erosion rates calculated from river gauge data from Baspa II. Several charcoal layers and charcoal pieces from the uppermost palaeo-lake levels around 5000 cal yr BP might be related to woodland clearance and they possibly represent one of the oldest evidences for human presence in the Baspa Valley during Neolithic time.

  20. Influence of environmental parameters on the concentration of subsurface dissolved methane in two hydroelectric power plants in Brazil

    NASA Astrophysics Data System (ADS)

    Silva, M. G.; Marani, L.; Alvala, P. C.

    2013-12-01

    Methane (CH4) is a trace gas in the atmosphere of great importance for atmospheric chemistry as one of the main greenhouse gases. There are different sources with the largest individual production associated with the degradation of organic matter submerged in flooded areas. The amount of dissolved methane that reaches the surface depends on the production in the sediments and consumption in the water column. Both processes are associated with microbial activity and consequently dependent on the physico-chemical environmental conditions. The construction of hydroelectric dams cause flooding of areas near the river that can change the characteristics of the environment and cause changes in subsurface methane concentration. In this work, we studied two hydroelectric plants located in Brazil: Batalha (17°20'39.52"S, 47°29'34.29"W), under construction when the samples were take, and Itaipu (25°24'45.00"S, 54°35'39.00"W) which has been floated over 30 years ago. The water samples to determine dissolved methane were collected approximately 5 cm near the surface. In each collection point was measured depth, water temperature, pH and redox potential. The range of dissolved methane between the two dams was similar: 0.07-10.33 μg/l (Batalha) and 0.15-10.93 μg/l (Itaipu). However, the Batalha's average (4.04 × 3.43 μg/l; median = 3.66 μg/l) was higher than that observed in Itaipu (2.15 × 1.59 μg/l; median = 2.53 μg/l). The influence of environmental parameters on the concentration of dissolved methane was evaluated by multivariate statistical techniques (Principal Component Analysis - PCA). All of the parameters had some correlation with dissolved methane, however, the greatest contribution in Batalha was associated with pH while in Itaipu was the depth. The pH variation of the various points studied in Batalha may be associated with periods of drought and flooding of the river and hence the incorporation of organic matter in the environment. The organisms

  1. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: Bull Run, Portland, Oregon

    SciTech Connect

    1980-05-01

    The National Conference of State Legislatures' Small-Scale Hydroelectric Policy Project is designed to assist selected state legislatures in looking at the benefits that a state can derive from the development of small-scale hydro, and in carrying out a review of state laws and regulations that affect the development of the state's small-scale hydro resources. The successful completion of the project should help establish state statutes and regulations that are consistent with the efficient development of small-scale hydro. As part of the project's work with state legislatures, seven case studies of small-scale hydro sites were conducted to provide a general analysis and overview of the significant problems and opportunities for the development of this energy resource. The case study approach was selected to expose the actual difficulties and advantages involved in developing a specific site. Such an examination of real development efforts will clearly reveal the important aspects about small-scale hydro development which could be improved by statutory or regulatory revision. Moreover, the case study format enables the formulation of generalized opportunities for promoting small-scale hydro based on specific development experiences. The case study for small-scale hydro power development at the City of Portland's water reserve in the Bull Run Forest is presented with information included on the Bull Run hydro power potential, current water usage, hydro power regulations and plant licensing, technical and economic aspects of Bull Run project, and the environmental impact. (LCL)

  2. Tsuwalhkalh Ti Tmicwa (The Land is Ours): Stat'imc Self-Determination in the Face of Large-Scale Hydro-electric Development

    NASA Astrophysics Data System (ADS)

    Moritz, Sarah Carmen

    In Canada, First Nations asserting authority over their lands are developing diverse strategies to overcome the state''s dogmatic insistence on jurisdictional sovereignty. This movement corresponds to the wider context of the challenges faced by indigenous people to use their own ways of knowing to resist or reformulate legal doctrines and political tenets based on colonial power. Interior Salish Stat'imc people identify themselves through a strong and ongoing social relationship with Sataqwa7, the Fraser River, and the "Valley of Plenty"---now known as the flooded Bridge River Valley---maintained through Stat'imc knowledge and cultural practice and demonstrated by talk of '"the Stat'imc right to fish" and Tsuwalhkalh Ti Tmicwa (The Land is Ours). Stat'imc fishers are prepared to contest and resist any regulatory system that is understood to impact this right to fish while they advocate their own ways of sustainable fishing and water management. Based on ethnographic research in collaboration with Stat'imc people, this thesis explores some of these often successful contestations especially in the context of increasing territorial governance and by example of the rapidly transforming relationship between Stat'imc, BC Hydro and the Province of BC. Interior Salish Stat'imc people are currently navigating through a significant phase of increasing jurisdiction and authority and recognition of (unsettled) territorial property relationships. This very dynamic process is marked by strategic collaborations, compensation for 'infringements' on St'a'imc Title and Rights, and conservation efforts to protect their home. An important example is the changing relationship between Stat'imc people and BC Hydro---a relationship between two groups with radically different cultures and agendas: Stat'imc people in a struggle for self-determination, social justice and cultural survival and BC Hydro, a corporate culture, with the agenda to provide hydro-electric power to BC, maintain

  3. Underground pumped hydroelectric storage

    SciTech Connect

    Allen, R.D.; Doherty, T.J.; Kannberg, L.D.

    1984-07-01

    Underground pumped hydroelectric energy storage was conceived as a modification of surface pumped storage to eliminate dependence upon fortuitous topography, provide higher hydraulic heads, and reduce environmental concerns. A UPHS plant offers substantial savings in investment cost over coal-fired cycling plants and savings in system production costs over gas turbines. Potential location near load centers lowers transmission costs and line losses. Environmental impact is less than that for a coal-fired cycling plant. The inherent benefits include those of all pumped storage (i.e., rapid load response, emergency capacity, improvement in efficiency as pumps improve, and capacity for voltage regulation). A UPHS plant would be powered by either a coal-fired or nuclear baseload plant. The economic capacity of a UPHS plant would be in the range of 1000 to 3000 MW. This storage level is compatible with the load-leveling requirements of a greater metropolitan area with population of 1 million or more. The technical feasibility of UPHS depends upon excavation of a subterranean powerhouse cavern and reservoir caverns within a competent, impervious rock formation, and upon selection of reliable and efficient turbomachinery - pump-turbines and motor-generators - all remotely operable.

  4. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  5. Feasible eigenvalue sensitivity for large power systems

    SciTech Connect

    Smed, T. . Dept. of Electric Power Systems)

    1993-05-01

    Traditional eigenvalue sensitivity for power systems requires the formulation of the system matrix, which lacks sparsity. In this paper, a new sensitivity analysis, derived for a sparse formulation, is presented. Variables that are computed as intermediate results in established eigen value programs for power systems, but not used further, are given a new interpretation. The effect of virtually any control action can be assessed based on a single eigenvalue-eigenvector calculation. In particular, the effect of active and reactive power modulation can be found as a multiplication of two or three complex numbers. The method is illustrated in an example for a large power system when applied to the control design for an HVDC-link.

  6. [Effects of the installation of the Rosal hydroelectric power station, Itabapoana River, States of Espírito Santo and Rio de Janeiro, on anophelinae, planorbidae and phlebotominae].

    PubMed

    Rezende, Helder Ricas; Sessa, Paulo Augusto; Ferreira, Adelson Luiz; dos Santos, Claudiney Biral; Leite, Gustavo Rocha; Falqueto, Aloísio

    2009-01-01

    The construction of dams usually changes the composition of the fauna within their areas of influence. In the area where the Rosal hydroelectric power station has been installed, in the States of Espírito Santo and Rio de Janeiro, changes to the abundance of anophelinae, planorbidae and phlebotominae were evaluated before (1998-2000) and after (2000-2005) the damming. Nine sample collection points were defined, each represented by a home and its outbuildings, shelters for domestic animals and water collection points within a radius of 150m. One hundred and three adult anophelinae were collected before the damming and 313 afterwards; 200 immature anophelinae before and 708 afterwards; 868 planorbidae before and 486 afterwards; and 2,979 phlebotominae before and 912 afterwards. The vector record, consisting of anophelinae, planorbidae and phlebotominae, shows the potential of this area for transmission of malaria, schistosomiasis and American cutaneous leishmaniasis. However, the environmental changes did not increase the risk of the occurrence of these diseases. PMID:19448934

  7. Displacement back analysis for a high slope of the Dagangshan Hydroelectric Power Station based on BP neural network and particle swarm optimization.

    PubMed

    Liang, Zhengzhao; Gong, Bin; Tang, Chunan; Zhang, Yongbin; Ma, Tianhui

    2014-01-01

    The right bank high slope of the Dagangshan Hydroelectric Power Station is located in complicated geological conditions with deep fractures and unloading cracks. How to obtain the mechanical parameters and then evaluate the safety of the slope are the key problems. This paper presented a displacement back analysis for the slope using an artificial neural network model (ANN) and particle swarm optimization model (PSO). A numerical model was established to simulate the displacement increment results, acquiring training data for the artificial neural network model. The backpropagation ANN model was used to establish a mapping function between the mechanical parameters and the monitoring displacements. The PSO model was applied to initialize the weights and thresholds of the backpropagation (BP) network model and determine suitable values of the mechanical parameters. Then the elastic moduli of the rock masses were obtained according to the monitoring displacement data at different excavation stages, and the BP neural network model was proved to be valid by comparing the measured displacements, the displacements predicted by the BP neural network model, and the numerical simulation using the back-analyzed parameters. The proposed model is useful for rock mechanical parameters determination and instability investigation of rock slopes. PMID:25140345

  8. Displacement Back Analysis for a High Slope of the Dagangshan Hydroelectric Power Station Based on BP Neural Network and Particle Swarm Optimization

    PubMed Central

    Liang, Zhengzhao; Gong, Bin; Tang, Chunan; Zhang, Yongbin; Ma, Tianhui

    2014-01-01

    The right bank high slope of the Dagangshan Hydroelectric Power Station is located in complicated geological conditions with deep fractures and unloading cracks. How to obtain the mechanical parameters and then evaluate the safety of the slope are the key problems. This paper presented a displacement back analysis for the slope using an artificial neural network model (ANN) and particle swarm optimization model (PSO). A numerical model was established to simulate the displacement increment results, acquiring training data for the artificial neural network model. The backpropagation ANN model was used to establish a mapping function between the mechanical parameters and the monitoring displacements. The PSO model was applied to initialize the weights and thresholds of the backpropagation (BP) network model and determine suitable values of the mechanical parameters. Then the elastic moduli of the rock masses were obtained according to the monitoring displacement data at different excavation stages, and the BP neural network model was proved to be valid by comparing the measured displacements, the displacements predicted by the BP neural network model, and the numerical simulation using the back-analyzed parameters. The proposed model is useful for rock mechanical parameters determination and instability investigation of rock slopes. PMID:25140345

  9. Stability analysis of large electric power systems

    SciTech Connect

    Elwood, D.M.

    1993-01-01

    Modern electric power systems are large and complicated, and, in many regions of the world, the generation and transmission systems are operating near their limits. Ensuring the reliable operation of the power system requires engineers to study the response of the system to various disturbances. The responses to large disturbances are examined by numerically solving the nonlinear differential-algebraic equations describing the power system. The response to small disturbances is typically studied via eigenanalysis. The Electric Power Research Institute (EPRI) recently developed the Extended Transient/Mid-term Stability Program (ETMSP) to study large disturbance stability and the Small Signal Stability Program Package (SSSP) to study small signal stability. The primary objectives of the work described in this report were to (1) explore ways of speeding up ETMSP, especially on mid-term voltage stability problems, (2) explore ways of speeding up the Multi-Area Small-Signal Stability program (MASS), one of the codes in SSSP, and (3) explore ways of increasing the size of problem that can be solved by the Cray version of MASS.

  10. Large-scale wind power farms as power plants

    NASA Astrophysics Data System (ADS)

    Gjengedal, Terje

    2005-07-01

    The integration of large-scale wind power into weak power systems raises several issues that must be clarified. Typically these include the practical connection to the network, integration with the network system, system stability, system operation, necessary installations and extensions of the network, etc. At the same time, careful attention must be paid to the functional requirements such wind farms should meet in order to enhance system responses. Different wind power technologies have different characteristics and control possibilities. In this article, three technologies have been studied with respect to their dynamic performance, and a transient stability study has been performed in order to illustrate the differences in the three technologies. The results clearly show that there are differences in behaviour and in control possibilities. Hence there are also differences in how well they can meet functional requirements. When discussing to what degree strict requirements should be imposed on wind power, it should be kept in mind that some requirements can be met with small or moderate costs, while others may be expensive or difficult to meet. Some requirements may also mean a reduction in generation and hence in revenues. Rather than imposing strict requirements on wind turbines as such, ancillary services should be met in the most suitable way. It is not obvious that the same requirements should apply to wind power in hydro power-dominated systems compared with, for instance, systems with a large share of nuclear or thermal power. It may well be cheaper to incorporate primary power control and system-stabilizing equipment in other power plants or grid points than in many small wind turbine generators. General conclusions cannot be made on this, but the issue should be the focal point of system operators everywhere. Copyright

  11. 7. SHOSHONE HYDROELECTRIC PLANT, WEST ELEVATION OF MAIN BUILDING TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. SHOSHONE HYDROELECTRIC PLANT, WEST ELEVATION OF MAIN BUILDING TO THE LEFT, NORTH ELEVATION OF OFFICE BUILDING TO THE RIGHT, VIEW TO THE EAST. CONCRETE 'PATH' IN FOREGROUND IS THE CONDUIT THROUGH WHICH POWER CABLES RUN FROM THE TRANSFORMERS TO THE 115 KV SUBSTATION. - Shoshone Hydroelectric Plant Complex, 60111 U.S. Highway 6, Garfield County, CO

  12. 75 FR 77862 - FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... Street, Gloucester, MA 01930; Telephone: (978) 283-2822. Solia 9 Hydroelectric's proposed Lock and Dam 15... Energy Regulatory Commission FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing... Hydroelectric, LLC filed preliminary permit applications, pursuant to section 4(f) of the Federal Power...

  13. Operating stability of hydroelectric stations with downstream surge tanks

    SciTech Connect

    Murav`ev, O.A.; Berlin, V.V.

    1995-10-01

    The possibilities for reducing the cross-sectional area of downstream surge tanks under the condition of providing stable regimes of the hydroelectric power plant are analyzed. Two calculation methods are described.

  14. Precipitation Estimates for Hydroelectricity

    NASA Technical Reports Server (NTRS)

    Tapiador, Francisco J.; Hou, Arthur Y.; de Castro, Manuel; Checa, Ramiro; Cuartero, Fernando; Barros, Ana P.

    2011-01-01

    Hydroelectric plants require precise and timely estimates of rain, snow and other hydrometeors for operations. However, it is far from being a trivial task to measure and predict precipitation. This paper presents the linkages between precipitation science and hydroelectricity, and in doing so it provides insight into current research directions that are relevant for this renewable energy. Methods described include radars, disdrometers, satellites and numerical models. Two recent advances that have the potential of being highly beneficial for hydropower operations are featured: the Global Precipitation Measuring (GPM) mission, which represents an important leap forward in precipitation observations from space, and high performance computing (HPC) and grid technology, that allows building ensembles of numerical weather and climate models.

  15. The possible negative consequences of underground dam and reservoir construction and operation in coastal karst areas: an example of the hydro-electric power plant (HEPP) Ombla near Dubrovnik (Croatia)

    NASA Astrophysics Data System (ADS)

    Roje-Bonacci, T.; Bonacci, O.

    2013-08-01

    The Ombla Spring represents a typical abundant coastal karst spring located in the vicinity of the town of Dubrovnik (Croatia). Its outlet is at an altitude of 2.5 m above sea level (m a.s.l.) and the water from it immediately flows into the Adriatic Sea. The minimum and maximum measured discharges are 3.96 m3 s-1 and 117 m3 s-1, respectively. The Trebišnjica River traverses through its catchment. The mean annual discharge, after the canalization of over 60 km of its watercourse with spray concrete (in the time span 1981-2011), is 24.05 m3 s-1. Before massive civil engineering work which took place during 1968-1980, the mean annual discharge was 28.35 m3 s-1. There is a project for construction of the hydro-electric power plant (HEPP) Ombla, which will exclusively use groundwater from the Ombla Spring karst aquifer. The underground dam will be constructed about 200 m behind the existing karst spring outflow in the karst massif, by injecting a grout curtain. The top of the grout curtain is planned to be at an altitude of 130 m a.s.l. This karst system is complex, sensitive, vulnerable and ecologically extremely valuable. The grout curtain, as well as the HEPP Ombla development, could lead to extremely dangerous technical and environmental consequences. In this paper some probable, negative consequences of the HEPP Ombla construction and development are explained. The HEPP Ombla could result in many large and hard-to-predict negative consequences which are specific for this particular HEPP, for example (1) severe spring discharge change; (2) unpredictable regional groundwater redistribution; (3) threatening of endemic fauna; (4) induced seismicity; (5) induced sinkholes; (6) occurrence of landslides; (7) conflict regarding internationally shared karst aquifers; (8) intensification of karst flash floods; (9) sea water intrusion in coastal karst aquifer; etc.

  16. Large eddy simulation of powered Fontan hemodynamics.

    PubMed

    Delorme, Y; Anupindi, K; Kerlo, A E; Shetty, D; Rodefeld, M; Chen, J; Frankel, S

    2013-01-18

    Children born with univentricular heart disease typically must undergo three open heart surgeries within the first 2-3 years of life to eventually establish the Fontan circulation. In that case the single working ventricle pumps oxygenated blood to the body and blood returns to the lungs flowing passively through the Total Cavopulmonary Connection (TCPC) rather than being actively pumped by a subpulmonary ventricle. The TCPC is a direct surgical connection between the superior and inferior vena cava and the left and right pulmonary arteries. We have postulated that a mechanical pump inserted into this circulation providing a 3-5 mmHg pressure augmentation will reestablish bi-ventricular physiology serving as a bridge-to-recovery, bridge-to-transplant or destination therapy as a "biventricular Fontan" circulation. The Viscous Impeller Pump (VIP) has been proposed by our group as such an assist device. It is situated in the center of the 4-way TCPC intersection and spins pulling blood from the vena cavae and pushing it into the pulmonary arteries. We hypothesized that Large Eddy Simulation (LES) using high-order numerical methods are needed to capture unsteady powered and unpowered Fontan hemodynamics. Inclusion of a mechanical pump into the CFD further complicates matters due to the need to account for rotating machinery. In this study, we focus on predictions from an in-house high-order LES code (WenoHemo(TM)) for unpowered and VIP-powered idealized TCPC hemodynamics with quantitative comparisons to Stereoscopic Particle Imaging Velocimetry (SPIV) measurements. Results are presented for both instantaneous flow structures and statistical data. Simulations show good qualitative and quantitative agreement with measured data. PMID:23177085

  17. Large Eddy Simulation of Powered Fontan Hemodynamics

    PubMed Central

    Delorme, Y.; Anupindi, K.; Kerlo, A.E.; Shetty, D.; Rodefeld, M.; Chen, J.; Frankel, S.

    2012-01-01

    Children born with univentricular heart disease typically must undergo three open heart surgeries within the first 2–3 years of life to eventually establish the Fontan circulation. In that case the single working ventricle pumps oxygenated blood to the body and blood returns to the lungs flowing passively through the Total Cavopulmonary Connection (TCPC) rather than being actively pumped by a subpulmonary ventricle. The TCPC is a direct surgical connection between the superior and inferior vena cava and the left and right pulmonary arteries. We have postulated that a mechanical pump inserted into this circulation providing a 3–5 mmHg pressure augmentation will reestablish bi-ventricular physiology serving as a bridge-to-recovery, bridge-to-transplant or destination therapy as a “biventricular Fontan” circulation. The Viscous Impeller Pump (VIP) has been proposed by our group as such an assist device. It is situated in the center of the 4-way TCPC intersection and spins pulling blood from the vena cavae and pushing it into the pulmonary arteries. We hypothesized that Large Eddy Simulation (LES) using high-order numerical methods are needed to capture unsteady powered and unpowered Fontan hemodynamics. Inclusion of a mechanical pump into the CFD further complicates matters due to the need to account for rotating machinery. In this study, we focus on predictions from an in-house high-order LES code (WenoHemo™) for unpowered and VIP-powered idealized TCPC hemodynamics with quantitative comparisons to Stereoscopic Particle Imaging Velocimetry (SPIV) measurements. Results are presented for both instantaneous flow structures and statistical data. Simulations show good qualitative and quantitative agreement with measured data. PMID:23177085

  18. 2D THD and 3D TEHD analysis of large spindle supported thrust bearings with pins and double layer system used in the three gorges hydroelectric generators

    NASA Astrophysics Data System (ADS)

    Huang, B.; Wu, Z. D.; Wu, J. L.; Wang, L. Q.

    2012-11-01

    A 2D THD model and a 3DTEHD model for large spindle supported thrust bearings were set up and used to analyze the lubrication performance of the Three Gorges test thrust beating withpins and double layer system developed by Alstom Power. The finite difference method was employed to solve the THD model, and the thermal-elasticdeformations in the pad and runner were obtained by the finite element software ANSYS11.0. The data transfer between the THD model and ANSYS11.0 was carried out automatically by an interface program.A detailed comparison between the experimental results and numerical predictions by the two different modelsset up in this paper was carried out. Poor agreement has been found between the theoretical results obtained by 2D THD model and experimental data, while 3D TEHD provides fairly good agreement, confirming the importance of thermal effects and thermal-elastic deformations in both pad and runner.

  19. Wildlife and Wildlife Habitat Mitigation Plan for the Thompson Falls Hydroelectric Project, Final Report.

    SciTech Connect

    Bissell, Gael; Wood, Marilyn

    1985-08-01

    This document presents a preliminary mitigation and enhancement plan for the Thompson Falls hydroelectric project. It discusses options available to provide wildlife protection, mitigation and enhancement in accordance with the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L. 96-501). The options focus on mitigation for wildlife and wildlife habitat losses attributable to the construction of the hydroelectric project. These losses were previously estimated from the best available information concerning the degree of negative and positive impacts to target wildlife species (Wood and Olsen 1984). Criteria by which the mitigation alternatives were evaluated were the same as those used to assess the impacts identified in the Phase I document (Wood and Olsen 1984). They were also evaluated according to feasibility and cost effectiveness. This document specifically focuses on mitigation for target species which were identified during Phase I (Wood and Olsen 1984). It was assumed mitigation and enhancement for the many other target wildlife species impacted by the hydroelectric developments will occur as secondary benefits. The recommended mitigation plan includes two recommended mitigation projects: (1) development of wildlife protection and enhancement plans for MPC lands and (2) strategies to protect several large islands upstream of the Thompson Falls reservoir. If implemented, these projects would provide satisfactory mitigation for wildlife losses associated with the Thompson Falls hydroelectric project. The intent of the mitigation plan is to recommend wildlife management objectives and guidelines. The specific techniques, plans, methods and agreements would be developed is part of the implementation phase.

  20. Enhanced decomposition algorithm for multistage stochastic hydroelectric scheduling. Technical report

    SciTech Connect

    Morton, D.P.

    1994-01-01

    Handling uncertainty in natural inflow is an important part of a hydroelectric scheduling model. In a stochastic programming formulation, natural inflow may be modeled as a random vector with known distribution, but the size of the resulting mathematical program can be formidable. Decomposition-based algorithms take advantage of special structure and provide an attractive approach to such problems. We develop an enhanced Benders decomposition algorithm for solving multistage stochastic linear programs. The enhancements include warm start basis selection, preliminary cut generation, the multicut procedure, and decision tree traversing strategies. Computational results are presented for a collection of stochastic hydroelectric scheduling problems. Stochastic programming, Hydroelectric scheduling, Large-scale Systems.

  1. Pumpspeicherbecken im Karstgrundwasserleiter des Weißen Jura der Schwäbischen Alb. Erste Ergebnisse aus der geologischen und hydrogeologischen Erkundung für die Planfeststellung Pumped-storage hydroelectric power plant in the Jurassic karst aquifer of the swabian alb, Germany

    NASA Astrophysics Data System (ADS)

    Neukum, Christoph; Köhler, Hans Joachim; Fernandez-Steeger, Tomas; Hennings, Sibylle; Azzam, Rafig

    2014-06-01

    Extensive geological and hydrogeological investigations have been undertaken for the planned pumped-storage hydroelectric power plant in "Blautal" (Swabian Alb, Germany) in order to characterise the Jurassic karst aquifer in which the lower reservoir will be constructed. The preferred option for the plant setup is to integrate the lower reservoir into the groundwater without sealing. Therefore, in order to reliably predict the impact of the pumped storage plant operations on the surrounding drinking water wells and groundwater dependent ecosystems, a comprehensive database has been developed to assess the hydraulic conditions of the karst aquifer. A large scale geological site investigation was carried out to characterise the rock mass and extensive hydraulic tests were performed in many boreholes. The results of the hydraulic characterisation were then implemented in a three dimensional flow model. In this paper, the first results of the geological and hydrogeological investigations are presented and discussed.

  2. Power fluctuations, large deviations and turbulence

    SciTech Connect

    Bandi, Mahesh M; Chumakov, Sergei; Connaughton, Colm P

    2008-01-01

    We study local power fluctuations in numerical simulations of stationary, homogenous, isotropic turbulence in two and three dimensions with Gaussian forcing. Due to the near-Gaussianity of the one-point velocity distribution, the probability distribution function (pdf) of the local power is well modeled by the pdf of the product of two joint normally distributed variables. In appropriate units, this distribution is calculated exactly and shown to satisfy a Fluctuation Relation (FR) with a coefficient which depends on {epsilon}.

  3. Optimal control of hydroelectric facilities

    NASA Astrophysics Data System (ADS)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  4. A perspective of power management for large space platforms

    NASA Technical Reports Server (NTRS)

    Decker, D. K.; Graves, J.

    1982-01-01

    NASA and military applications for high power spacecraft are presently being planned. A perspective of autonomous power management for low earth orbit large space platforms is presented. A multichannel 250 kWe utility-type power subsystem is used as a baseline system. The need for automation is reviewed, based on power subsystem complexity, survivability requirements, and cost benefits. On-board versus ground management is discussed with respect to these needs. In addition, the utilization of autonomous power management to enable technology readiness of large complex power subsystems is described. Recommendations are made for further technology thrusts.

  5. 76 FR 54790 - Large Power Transformers From Korea

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ..., and by publishing the notice in the Federal Register of July 20, 2011 (76 FR 43343). The conference... COMMISSION Large Power Transformers From Korea Determination On the basis of the record \\1\\ developed in the... Korea of large power transformers, provided for in subheadings 8504.23.00 and 8504.90.95 of...

  6. 77 FR 52758 - Large Power Transformers From Korea

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... publishing the notice in the Federal Register of March 21, 2012 (77 FR 16559). The hearing was held in... COMMISSION Large Power Transformers From Korea Determination On the basis of the record \\1\\ developed in the... the United States is materially injured, by reason of imports from Korea of large power...

  7. Power oscillation suppression by robust SMES in power system with large wind power penetration

    NASA Astrophysics Data System (ADS)

    Ngamroo, Issarachai; Cuk Supriyadi, A. N.; Dechanupaprittha, Sanchai; Mitani, Yasunori

    2009-01-01

    The large penetration of wind farm into interconnected power systems may cause the severe problem of tie-line power oscillations. To suppress power oscillations, the superconducting magnetic energy storage (SMES) which is able to control active and reactive powers simultaneously, can be applied. On the other hand, several generating and loading conditions, variation of system parameters, etc., cause uncertainties in the system. The SMES controller designed without considering system uncertainties may fail to suppress power oscillations. To enhance the robustness of SMES controller against system uncertainties, this paper proposes a robust control design of SMES by taking system uncertainties into account. The inverse additive perturbation is applied to represent the unstructured system uncertainties and included in power system modeling. The configuration of active and reactive power controllers is the first-order lead-lag compensator with single input feedback. To tune the controller parameters, the optimization problem is formulated based on the enhancement of robust stability margin. The particle swarm optimization is used to solve the problem and achieve the controller parameters. Simulation studies in the six-area interconnected power system with wind farms confirm the robustness of the proposed SMES under various operating conditions.

  8. Ondergrondse pomp accumulatie centrale in nederland: vooronderzoek (Pumped Storage hydroelectric plants with underground reservoirs in the Netherlands: preliminary report)

    SciTech Connect

    Not Available

    1980-12-01

    The use of a pumped storage hydroelectric plant based on water power in the rural electricity net makes it possible to realize performance improvements and fuel savings in the existing plants. Because for an installation with above- and below-ground reservoirs which are controlled on the surface only a few locations are suitable in the Netherlands (gradient from 50 - 150 meters), in such a technique the reservoirs should be made as large as possible. In a design suitable for the Netherlands an underground pump hydroelectric storage plant (OPAC) should be possible by constructing a reservoir at a considerable depth underground. Such a plant could be built with a capacity from 500 to 1,200 MW in order to provide adequate support for the daily peak demands of the other electric power plants, whereby then it could be realized that expensive peak power could be produced cheaply.

  9. Changes in human schistosomiasis levels after the construction of two large hydroelectric dams in central Côte d'Ivoire.

    PubMed

    N'Goran, E K; Diabate, S; Utzinger, J; Sellin, B

    1997-01-01

    The construction of large dams has been shown to increase the prevalence and intensity of human schistosomiasis. However, until now no study had been carried out to assess the impact of such a project in Côte d'Ivoire. For Kossou and Taabo, two large dams which became operational in the 1970s, baseline data are available on schistosomiasis prevalence in the surrounding area before dam construction, so that the changes in schistosomiasis levels can be assessed. We re-evaluated the prevalence of Schistosoma haematobium and S. mansoni in November 1992, by analysing 548 urine and 255 stool samples, respectively, from schoolchildren from five villages around each lake. A marked increase in the overall prevalence of S. haematobium was observed, from 14% to 53% around Lake Kossou and from 0 to 73% around Lake Taabo. Baseline data for S. mansoni are only available for Lake Taabo, where a prevalence of 3% was found in 1979 and where the prevalence in 1992 was still low at 2%. The construction of these two large dams therefore led to little change in S. mansoni prevalence but to a significant increase in that of S. haematobium. PMID:9509626

  10. Assessment of spermatogenesis and plasma sex steroids in a seasonal breeding teleost: a comparative study in an area of influence of a tributary, downstream from a hydroelectric power dam, Brazil.

    PubMed

    Domingos, Fabricio F T; Thomé, Ralph G; Arantes, Fabio P; Castro, Antonio Carlos S; Sato, Yoshimi; Bazzoli, Nilo; Rizzo, Elizete

    2012-12-01

    River damming and building of hydroelectric power plants interrupt the reproductive migration routes and change the major physicochemical parameters of water quality, with drastic consequences for populations of migratory fishes. The goal of this study was to evaluate proliferation and cell death during spermatogenesis and serum profiles of sex steroids in Prochilodus argenteus, from the São Francisco River, downstream from the Três Marias Dam. A total of 257 adult males were caught quarterly during a reproductive cycle in two sites: the first 34 km of the river after the dam (site 1) and the second 34-54 km after the dam (site 2), after the confluence with a tributary, the Abaeté River. Seasonal changes in the testicular activity associated with morphometric analyses of germ cells as well as proliferation and testicular apoptosis support a more active spermatogenesis in fish from site 2, where higher levels of sex steroids and gonadosomatic index (GSI) were also found. In site 1, fish presented low serum levels of testosterone, 17β-estradiol and 17α-hydroxyprogesterone and a low GSI during gonadal maturation. Spermatogonial proliferation (PCNA) and apoptosis (TUNEL) were more elevated in fish from site 1, but spermatocytes were mainly labelled in fish from site 2. Overall, these data demonstrate changes in testicular activity and plasma sex steroids in a neotropical teleost fish living downstream from a hydroelectric dam, supplying new data on fish reproduction in regulated rivers. Moreover, morphometric analyses associated with sex steroids profiles provide reliable tools to assess fish spermatogenesis under environmental stress conditions. PMID:22688450

  11. Verification Test of Power Fluctuation Suppression System for Large PV

    NASA Astrophysics Data System (ADS)

    Noro, Yasuhiro; Naoi, Shinya; Toba, Koji; Kimura, Misao; Minegishi, Toshiaki; Shimizu, Masanao; Aoki, Shinichi; Okuda, Yasuo

    The large scale photovoltaic (PV) generation station is expected to spread in the future. However, output power of renewable energy sources such as PV is affected by weather conditions and their output tends to be unstable. As a result, the penetration of PV power station makes it difficult to maintain frequency of power system in allowable range. The authors have developed a suppression system to stabilize output power fluctuation of a large PV generation station. To reduce short term fluctuation, storage batteries applying SCiBTM are used. In this paper, verification test results are explained and simulation results to improve control performance are also shown.

  12. 78 FR 55072 - Sutton Hydroelectric Company, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-09

    ... Energy Regulatory Commission Sutton Hydroelectric Company, LLC; Notice of Preliminary Permit Application..., 2013, Sutton Hydroelectric Company, LLC filed an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the...

  13. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and...

  14. 78 FR 62616 - Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... Energy Regulatory Commission Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have changed its name to Salmon Creek Hydroelectric Company, LLC for...

  15. Planar view of interior northwest side of lock wall, hydroelectric ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Planar view of interior northwest side of lock wall, hydro-electric power house and dam in background, westernmost section of lock, view towards northwest - St. Lucie Canal, St. Lucie Lock No. 1, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  16. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... Federal Energy Regulatory Commission Sutton Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and a... operation, a preliminary list of issues to be addressed in the Commission's National Environmental...

  17. Energy Perspective: Is Hydroelectricity Green?

    ERIC Educational Resources Information Center

    Childress, Vincent W.

    2009-01-01

    The current worldwide concern over energy is primarily related to imported oil, oil drilling and refining capacity, and transportation capacity. However, this concern has bolstered interest in a broader range of "green" energy technologies. In this article, the author discusses the use of hydroelectricity as an alternative energy source and…

  18. Power suppression at large scales in string inflation

    SciTech Connect

    Cicoli, Michele; Downes, Sean; Dutta, Bhaskar E-mail: sddownes@physics.tamu.edu

    2013-12-01

    We study a possible origin of the anomalous suppression of the power spectrum at large angular scales in the cosmic microwave background within the framework of explicit string inflationary models where inflation is driven by a closed string modulus parameterizing the size of the extra dimensions. In this class of models the apparent power loss at large scales is caused by the background dynamics which involves a sharp transition from a fast-roll power law phase to a period of Starobinsky-like slow-roll inflation. An interesting feature of this class of string inflationary models is that the number of e-foldings of inflation is inversely proportional to the string coupling to a positive power. Therefore once the string coupling is tuned to small values in order to trust string perturbation theory, enough e-foldings of inflation are automatically obtained without the need of extra tuning. Moreover, in the less tuned cases the sharp transition responsible for the power loss takes place just before the last 50-60 e-foldings of inflation. We illustrate these general claims in the case of Fibre Inflation where we study the strength of this transition in terms of the attractor dynamics, finding that it induces a pivot from a blue to a redshifted power spectrum which can explain the apparent large scale power loss. We compute the effects of this pivot for example cases and demonstrate how magnitude and duration of this effect depend on model parameters.

  19. ElGENANALYSlS OF LARGE ELECTRIC POWER SYSTEMS

    SciTech Connect

    Elwood, D. M.

    1991-02-01

    Modern electric power systems are large and complicated, and, in many regions, the generation and transmission systems are operating near their limits. Eigenanalysis is one of the tools used to analyze the behavior of these systems. Standard eigenvalue methods require that simplified models be used for these analyses; however, these simplified models do not adequately model all of the characteristics of large power systems. Thus, new eigenanalysis methods that can analyze detailed power system models are required. The primary objectives of the work described in this report were I) to determine the availability of eigenanalysis algorithms that are better than methods currently being applied and that could be used an large power systems and 2) to determine if vector supercomputers could be used to significantly increase the size of power systems that can be analyzed by a standard power system eigenanalysis code. At the request of the Bonneville Power Administration, the Pacific Northwest Laboratory (PNL) conducted a literature review of methods currently used for the eigenanalysis of large electric power systems, as well as of general eigenanalysis algorithms that are applicable to large power systems. PNL found that a number of methods are currently being used for the this purpose, and all seem to work fairly well. Furthermore, most of the general eigenanalysis techniques that are applicable to power systems have been tried on these systems, and most seem to work fairly well. One of these techniques, a variation of the Arnoldi method, has been incorporated into a standard power system eigenanalysis package. Overall, it appears that the general purpose eigenanalysis methods are more versatile than most of the other methods that have been used for power systems eigenanalysis. In addition, they are generally easier to use. For some problems, however, it appears that some of the other eigenanalysis methods may be better. Power systems eigenanalysis requires the

  20. Discharge transient coupling in large space power systems

    NASA Technical Reports Server (NTRS)

    Stevens, N. John; Stillwell, R. P.

    1990-01-01

    Experiments have shown that plasma environments can induce discharges in solar arrays. These plasmas simulate the environments found in low earth orbits where current plans call for operation of very large power systems. The discharges could be large enough to couple into the power system and possibly disrupt operations. Here, the general concepts of the discharge mechanism and the techniques of coupling are discussed. Data from both ground and flight experiments are reviewed to obtain an expected basis for the interactions. These concepts were applied to the Space Station solar array and distribution system as an example of the large space power system. The effect of discharges was found to be a function of the discharge site. For most sites in the array discharges would not seriously impact performance. One location at the negative end of the array was identified as a position where discharges could couple to charge stored in system capacitors. This latter case could impact performance.

  1. Forced response analysis of hydroelectric systems

    NASA Astrophysics Data System (ADS)

    Alligné, S.; Silva, P. C. O.; Béguin, A.; Kawkabani, B.; Allenbach, P.; Nicolet, C.; Avellan, F.

    2014-03-01

    At off-design operating points, Francis turbines develop cavitation vortex rope in the draft tube which may interact with the hydraulic system. Risk resonance assessment by means of eigenmodes computation of the system is usually performed. However, the system response to the excitation source induced by the cavitation vortex rope is not predicted in terms of amplitudes and phase. Only eigenmodes shapes with related frequencies and dampings can be predicted. Besides this modal analysis, the risk resonance assessment can be completed by a forced response analysis. This method allows identifying the contribution of each eigenmode into the system response which depends on the system boundary conditions and the excitation source location. In this paper, a forced response analysis of a Francis turbine hydroelectric power plant including hydraulic system, rotating train, electrical system and control devices is performed. First, the general methodology of the forced response analysis is presented and validated with time domain simulations. Then, analysis of electrical, hydraulic and hydroelectric systems are performed and compared to analyse the influence of control structures on pressure fluctuations induced by cavitation vortex rope.

  2. Large scale suppression of scalar power on a spatial condensation

    NASA Astrophysics Data System (ADS)

    Kouwn, Seyen; Kwon, O.-Kab; Oh, Phillial

    2015-03-01

    We consider a deformed single-field inflation model in terms of three SO(3) symmetric moduli fields. We find that spatially linear solutions for the moduli fields induce a phase transition during the early stage of the inflation and the suppression of scalar power spectrum at large scales. This suppression can be an origin of anomalies for large-scale perturbation modes in the cosmological observation.

  3. Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect

    Roberts, J. O.; Mosey, G.

    2013-02-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

  4. Feasibility assessment of the water energy resources of the United States for new low power and small hydro classes of hydroelectric plants: Appendix B - Assessment results by state

    SciTech Connect

    Hall, Douglas

    2006-01-01

    Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MWa) or small hydro (between 1 and 30 MWa) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in Appendix B. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

  5. Feasibility Assessment of Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants

    SciTech Connect

    Douglas G. Hall

    2006-01-01

    Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MW) or small hydro (between 1 and 30 MW) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

  6. Feasibility assessment of the water energy resources of the United States for new low power and small hydro classes of hydroelectric plants: Main report and Appendix A

    SciTech Connect

    Hall, Douglas G.; Reeves, Kelly S.; Brizzee, Julie; Lee, Randy D.; Carroll, Gregory R.; Sommers, Garold L.

    2006-01-01

    Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MWa) or small hydro (between 1 and 30 MWa) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

  7. Controllable Bidirectional dc Power Sources For Large Loads

    NASA Technical Reports Server (NTRS)

    Tripp, John S.; Daniels, Taumi S.

    1995-01-01

    System redesigned for greater efficiency, durability, and controllability. Modern electronically controlled dc power sources proposed to supply currents to six electromagnets used to position aerodynamic test model in wind tunnel. Six-phase bridge rectifier supplies load with large current at voltage of commanded magnitude and polarity. Current-feedback circuit includes current-limiting feature giving some protection against overload.

  8. Rotor dynamic considerations for large wind power generator systems

    NASA Technical Reports Server (NTRS)

    Ormiston, R. A.

    1973-01-01

    Successful large, reliable, low maintenance wind turbines must be designed with full consideration for minimizing dynamic response to aerodynamic, inertial, and gravitational forces. Much of existing helicopter rotor technology is applicable to this problem. Compared with helicopter rotors, large wind turbines are likely to be relatively less flexible with higher dimensionless natural frequencies. For very large wind turbines, low power output per unit weight and stresses due to gravitational forces are limiting factors. The need to reduce rotor complexity to a minimum favors the use of cantilevered (hingeless) rotor configurations where stresses are relieved by elastic deformations.

  9. Numerical approach to a problem of hydroelectric resources management

    NASA Astrophysics Data System (ADS)

    Bushenkov, V. A.; Ferreira, M. M. A.; Ribeiro, A. F.; Smirnov, G. V.

    2013-10-01

    In this paper we consider a simplified model for a system of hydro-electric power stations with reversible turbines. The objective of our work is to obtain the optimal profit of power production satisfying restrictions on the water level in the reservoirs. Two different numerical approaches are applied and compared. These approaches center on global optimization techniques (Chen-Burer algorithm) and on Projection Estimation Refinement method (PER method) used to reduce the dimension of the problem.

  10. Environmental impacts of hydroelectric power and other anthropogenic developments on the hydromorphology and ecology of the Durance channel and the Etang de Berre, southeast France.

    PubMed

    Warner, Robin F

    2012-08-15

    The generation of electricity through hydropower can, along with other anthropogenic activities, degrade river hydromorphology and ecosystems. In this case, water for power generation is diverted from the River Durance to a canal, which services a chain of 17 power stations, with the lower three being in the catchment of the Etang de Berre. This means that excess water and sediments are discharged into the salt-water lagoon with enormous consequences for ecosystems there. This paper summarizes the impacts of HEP and other human activities on both the river and lagoonal systems. It also considers agency and government attempts to understand and counter the degradation of these systems, both to date and in the future, with the latter catering for the potential impacts of future human development and global warming. PMID:22481366

  11. Generalized slow roll approximation for large power spectrum features

    SciTech Connect

    Dvorkin, Cora; Hu, Wayne

    2010-01-15

    We develop a variant of the generalized slow roll approach for calculating the curvature power spectrum that is well suited for order unity deviations in power caused by sharp features in the inflaton potential. As an example, we show that predictions for a step function potential, which has been proposed to explain order unity glitches in the cosmic microwave background temperature power spectrum at multipoles l=20-40, are accurate at the percent level. Our analysis shows that to good approximation there is a single source function that is responsible for observable features and that this function is simply related to the local slope and curvature of the inflaton potential. These properties should make the generalized slow roll approximation useful for inflation-model-independent studies of features, both large and small, in the observable power spectra.

  12. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    SciTech Connect

    Joe Taddeucci, P E

    2013-03-29

    double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction

  13. Comparison of Gross Greenhouse Gas Fluxes from Hydroelectric Reservoirs in Brazil with Thermopower Generation

    NASA Astrophysics Data System (ADS)

    Rogerio, J. P.; Dos Santos, M. A.; Matvienko, B.; dos Santos, E.; Rocha, C. H.; Sikar, E.; Junior, A. M.

    2013-05-01

    Widespread interest in human impacts on the Earth has prompted much questioning in fields of concern to the general public. One of these issues is the extent of the impacts on the environment caused by hydro-based power generation, once viewed as a clean energy source. From the early 1990s onwards, papers and studies have been challenging this assumption through claims that hydroelectric dams also emit greenhouse gases, generated by the decomposition of biomass flooded by filling these reservoirs. Like as other freshwater bodies, hydroelectric reservoirs produce gases underwater by biology decomposition of organic matter. Some of these biogenic gases are effective in terms of Global Warming. The decomposition is mainly due by anaerobically regime, emitting methane (CH4), nitrogen (N2) and carbon dioxide (CO2). This paper compare results obtained from gross greenhouse fluxes in Brazilian hydropower reservoirs with thermo power plants using different types of fuels and technology. Measurements were carried in the Manso, Serra da Mesa, Corumbá, Itumbiara, Estreito, Furnas and Peixoto reservoirs, located in Cerrado biome and in Funil reservoir located at Atlantic forest biome with well defined climatologically regimes. Fluxes of carbon dioxide and methane in each of the reservoirs selected, whether through bubbles and/or diffusive exchange between water and atmosphere, were assessed by sampling. The intensity of emissions has a great variability and some environmental factors could be responsible for these variations. Factors that influence the emissions could be the water and air temperature, depth, wind velocity, sunlight, physical and chemical parameters of water, the composition of underwater biomass and the operational regime of the reservoir. Based in this calculations is possible to conclude that the large amount of hydro-power studied is better than thermopower source in terms of atmospheric greenhouse emissions. The comparisons between the reservoirs studied

  14. Development and application of automatic frequency and power control systems for large power units

    NASA Astrophysics Data System (ADS)

    Bilenko, V. A.; Melamed, A. D.; Mikushevich, E. E.; Nikol'Skii, D. Yu.; Rogachev, R. L.; Romanov, N. A.

    2008-10-01

    We describe the results of work carried out at ZAO Interavtomatika on the development and putting into use of a system for automatically controlling the frequency and power output of large power units involving the retrofitting of the turbine’s hydraulic automatic control system. Certificates affirming conformity to the Standard of the System Operator — Centralized Dispatching Administration (SO-CDA) have been received for eight power units as an outcome of these efforts.

  15. A holistic approach towards optimal planning of hybrid renewable energy systems: Combining hydroelectric and wind energy

    NASA Astrophysics Data System (ADS)

    Dimas, Panagiotis; Bouziotas, Dimitris; Efstratiadis, Andreas; Koutsoyiannis, Demetris

    2014-05-01

    Hydropower with pumped storage is a proven technology with very high efficiency that offers a unique large-scale energy buffer. Energy storage is employed by pumping water upstream to take advantage of the excess of produced energy (e.g. during night) and next retrieving this water to generate hydro-power during demand peaks. Excess energy occurs due to other renewables (wind, solar) whose power fluctuates in an uncontrollable manner. By integrating these with hydroelectric plants with pumped storage facilities we can form autonomous hybrid renewable energy systems. The optimal planning and management thereof requires a holistic approach, where uncertainty is properly represented. In this context, a novel framework is proposed, based on stochastic simulation and optimization. This is tested in an existing hydrosystem of Greece, considering its combined operation with a hypothetical wind power system, for which we seek the optimal design to ensure the most beneficial performance of the overall scheme.

  16. PEP-II Large Power Supplies Rebuild Program at SLAC

    SciTech Connect

    Bellomo, P.; Lipari, J.J.; de Lira, A.C.; Rafael, F.S.; /SLAC

    2005-05-17

    Seven large power supplies (LGPS) with output ratings from 72kW to 270kW power PEP-II quad magnets in the electron-positron collider region. These supplies have posed serious maintenance and reliability problems since they were installed in 1997, resulting in loss of accelerator availability. A redesign/rebuild program was undertaken by the SLAC Power Conversion Department. During the 2004 summer shutdown all the control circuits in these supplies were redesigned and replaced. A new PWM control board, programmable logic controller, and touch panel have been installed to improve LGPS reliability, and to make troubleshooting easier. In this paper we present the details of this rebuilding program and results.

  17. Large space systems technology electronics: Data and power distribution

    NASA Technical Reports Server (NTRS)

    Dunbar, W. G.

    1980-01-01

    The development of hardware technology and manufacturing techniques required to meet space platform and antenna system needs in the 1980s is discussed. Preliminary designs for manned and automatically assembled space power system cables, connectors, and grounding and bonding materials and techniques are reviewed. Connector concepts, grounding design requirements, and bonding requirements are discussed. The problem of particulate debris contamination for large structure spacecraft is addressed.

  18. Just enough inflation: power spectrum modifications at large scales

    SciTech Connect

    Cicoli, Michele; Downes, Sean; Dutta, Bhaskar; Pedro, Francisco G.; Westphal, Alexander E-mail: ssdownes@phys.ntu.edu.tw E-mail: francisco.pedro@desy.de

    2014-12-01

    We show that models of 'just enough' inflation, where the slow-roll evolution lasted only 50- 60 e-foldings, feature modifications of the CMB power spectrum at large angular scales. We perform a systematic analytic analysis in the limit of a sudden transition between any possible non-slow-roll background evolution and the final stage of slow-roll inflation. We find a high degree of universality since most common backgrounds like fast-roll evolution, matter or radiation-dominance give rise to a power loss at large angular scales and a peak together with an oscillatory behaviour at scales around the value of the Hubble parameter at the beginning of slow-roll inflation. Depending on the value of the equation of state parameter, different pre-inflationary epochs lead instead to an enhancement of power at low ℓ, and so seem disfavoured by recent observational hints for a lack of CMB power at ℓ∼< 40. We also comment on the importance of initial conditions and the possibility to have multiple pre-inflationary stages.

  19. Survey of future requirements for large space structures. [space platforms, large antennas, and power surfaces

    NASA Technical Reports Server (NTRS)

    Hedgepeth, J. M.

    1976-01-01

    The future requirements for large space structures were examined and the foundation for long range planning of technology development for such structures is provided. Attention is concentrated on a period after 1985 for actual use. Basic ground rule of the study was that applications be of significant importance and have promise of direct economic benefit to mankind. The inputs to the study came from visits to a large number of government and industrial organizations, written studies in current literature, and approximate analyses of potential applications. The paper identifies diverse space applications for large area structures in three general categories: (1) large surfaces for power, (2) large antenna to receive and transmit energy over the radio frequency bandwidth, and (3) space platforms to provide area for general utilizations.

  20. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    NASA Astrophysics Data System (ADS)

    Popa, R.; Popa, F.; Popa, B.; Zachia-Zlatea, D.

    2010-08-01

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  1. Large-Scale Data Challenges in Future Power Grids

    SciTech Connect

    Yin, Jian; Sharma, Poorva; Gorton, Ian; Akyol, Bora A.

    2013-03-25

    This paper describes technical challenges in supporting large-scale real-time data analysis for future power grid systems and discusses various design options to address these challenges. Even though the existing U.S. power grid has served the nation remarkably well over the last 120 years, big changes are in the horizon. The widespread deployment of renewable generation, smart grid controls, energy storage, plug-in hybrids, and new conducting materials will require fundamental changes in the operational concepts and principal components. The whole system becomes highly dynamic and needs constant adjustments based on real time data. Even though millions of sensors such as phase measurement units (PMUs) and smart meters are being widely deployed, a data layer that can support this amount of data in real time is needed. Unlike the data fabric in cloud services, the data layer for smart grids must address some unique challenges. This layer must be scalable to support millions of sensors and a large number of diverse applications and still provide real time guarantees. Moreover, the system needs to be highly reliable and highly secure because the power grid is a critical piece of infrastructure. No existing systems can satisfy all the requirements at the same time. We examine various design options. In particular, we explore the special characteristics of power grid data to meet both scalability and quality of service requirements. Our initial prototype can improve performance by orders of magnitude over existing general-purpose systems. The prototype was demonstrated with several use cases from PNNL’s FPGI and was shown to be able to integrate huge amount of data from a large number of sensors and a diverse set of applications.

  2. Shawmut hydroelectric redevelopment project. Final technical and construction cost report

    SciTech Connect

    1982-08-01

    This report describes the major steps undertaken by the Central Maine Power Company to redevelop an old existing lowhead (19 to 23 ft) hydroelectric station and, at the same time, demonstrate the commercial viability of such a venture. The report addresses the process of site selection, preliminary conceptual design for determining economic viability, licensing and the regulatory process, final design, and project construction with the objective of presenting to the reader a technical and economical guide useful for a similar undertaking.

  3. Development of large wind energy power generation system

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The background and development of an experimental 100 kW wind-energy generation system are described, and the results of current field tests are presented. The experimental wind turbine is a two-bladed down-wind horizontal axis propeller type with a 29.4 m diameter rotor and a tower 28 m in height. The plant was completed in March, 1983, and has been undergoing trouble-free tests since then. The present program calls for field tests during two years from fiscal 1983 to 1984. The development of technologies relating to the linkage and operation of wind-energy power generation system networks is planned along with the acquisition of basic data for the development of a large-scale wind energy power generation system.

  4. Power conditioning for large dc motors for space flight applications

    NASA Technical Reports Server (NTRS)

    Veatch, Martin S.; Anderson, Paul M.; Eason, Douglas J.; Landis, David M.

    1988-01-01

    The design and performance of a prototype power-conditioning system for use with large brushless dc motors on NASA space missions are discussed in detail and illustrated with extensive diagrams, drawings, and graphs. The 5-kW 8-phase parallel module evaluated here would be suitable for use in the Space Shuttle Orbiter cargo bay. A current-balancing magnetic assembly with low distributed inductance permits high-speed current switching from a low-voltage bus as well as current balancing between parallel MOSFETs.

  5. Hoopa Valley Small Scale Hydroelectric Feasibility Project

    SciTech Connect

    Curtis Miller

    2009-03-22

    This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

  6. Concept for a power system controller for large space electrical power systems

    NASA Technical Reports Server (NTRS)

    Lollar, L. F.; Lanier, J. R., Jr.; Graves, J. R.

    1981-01-01

    The development of technology for a fail-operatonal power system controller (PSC) utilizing microprocessor technology for managing the distribution and power processor subsystems of a large multi-kW space electrical power system is discussed. The specific functions which must be performed by the PSC, the best microprocessor available to do the job, and the feasibility, cost savings, and applications of a PSC were determined. A limited function breadboard version of a PSC was developed to demonstrate the concept and potential cost savings.

  7. Hydroelectric power in Hawaii: a reconnaissance survey

    SciTech Connect

    1981-02-01

    The major conclusion of this study is that hydropower resources in the State of Hawaii are substantial, and they offer the potential for major increases in hydropower generating capacity. Hydropower resources on all islands total about 50 megawatts of potential generating capacity. Combined with the 18 megawatts of existing hydropower capacity, hydropower resources potentially could generate about 307 million kilowatt-hours of electric energy annually. This represents about 28% of the present combined electricity needs of the Neighbor Islands - Kauai, Molokai, Maui, and the Big Island. Hydropower resources on Kauai equal 72% of that island's electricity needs; on Molokai, 40%; on the Big Island, 20%; and on Maui, 18%. The island of Oahu, however, has only small hydropower resources, and could only generate a negligible portion of its electricity needs from this energy source. Existing and future (potential) hydropower capacities are summarized, and annual outputs for each island are estimated. Future hydropower facilities are subdivided into two categories, which show how much of the potential capacity is being actively considered for development, and how much is only tentatively proposed at the time.

  8. Economic dispatch control for large scale thermal power systems

    SciTech Connect

    Not Available

    1986-01-01

    A realistic model for economic dispatch control (EDC) which is valid for large scale thermal power system is described. This model properly accounts for the nonlinearities of the generation cost-curves introduced by the operation constraints of thermal units. The methodology of this model computes the optimal readjustments of generation schedules such that their total generation output meets the system demand, including the Area Control Error (ACE). The objective function to be minimized is the instantaneous operating cost of a power system subjected to several equality and inequality constraints, which represent the performance characteristics and operation limitations of the various units in the system as well as the active power loss in the transmission network. The generation cost curves and the active losses are represented using one of two models. The first model includes the exact piecewise linear curve formulation and the well known loss formula, while the second one considers a second order polynomial approximation of the generation cost curves and assumes that the active network losses are independent on the generation configuration and have constant percentage value from the total system demand. Each of these models has its merits to EDC strategies. 10 references, 7 figures, 3 tables.

  9. National perspective on environmental constraints to hydroelectric development

    SciTech Connect

    Hildebrand, S.G.; Sale, M.J.; Cada, G.F.; Loar, J.M.

    1985-01-01

    Two issues are analyzed relative to problems associated with the concentration of dissolved oxygen in tailwaters below dams and instream flow requirements for fisheries. The need for and technical challenges related to assessment of the environmental effects of multiple-project development in river basins are discussed. Although the focus of the DOE program is on small-scale hydroelectric development, the issues discussed here are applicable to large-scale facilities as well.

  10. Hydroelectric dams in Amazon as source of GHG

    SciTech Connect

    Rosa, L.P.; Schaeffer, R.; Santos, M.A.

    1996-12-31

    A recent paper by Fearnside points out that hydroelectric development in Amazonia is a significant source of greenhouse gases (GHG) emissions. This conclusion is in contrast to the common belief that hydroelectric dams are better than fossil fuel use in electric power generation, from the view point of GHG emissions. The authors have considered both CH{sub 4} and CO{sub 2} emissions taking into account the instantaneous radiative forcing due to a unit increase in the concentration of gases, the decay times of gases in the atmosphere and the emissions patterns of emissions vary depending on biomass density and type of the forest area flooded, as well as on depth of flooding. As the Fearnside paper is more concerned with CO{sub 2} emissions from the above water biomass, the authors` focus will be restricted to the formulae for calculating the cumulative effect of CO{sub 2}.

  11. Development of Large Current High Precision Pulse Power Supply

    NASA Astrophysics Data System (ADS)

    Takayanagi, Tomohiro; Koseki, Shoichiro; Kubo, Hiroshi; Katoh, Shuji; Ogawa, Shinichi

    JAEA and KEK are jointly constructing a high intensity proton accelerator project J-PARC. Its main accelerator is 3GeV synchrotron. Its injection bump magnets, especially horizontal paint bump magnets, are excited by large pulse currents. Their rated currents are over 10kA and pulse widths are about 1ms. Tracking errors are required to be less than 1%. Multiple connected two-quadrant IGBT choppers are adopted for their power supplies. Their output currents are controlled by feedback control with minor loop voltage control (m-AVR). When output current of a chopper intermits at small current, its output voltage rises up and current control becomes difficult. In this paper response of m-AVR and output voltage characteristics at current intermittent region are studied and an improved control scheme is proposed. The performance is confirmed by a test.

  12. Ferroelectric opening switches for large-scale pulsed power drivers.

    SciTech Connect

    Brennecka, Geoffrey L.; Rudys, Joseph Matthew; Reed, Kim Warren; Pena, Gary Edward; Tuttle, Bruce Andrew; Glover, Steven Frank

    2009-11-01

    Fast electrical energy storage or Voltage-Driven Technology (VDT) has dominated fast, high-voltage pulsed power systems for the past six decades. Fast magnetic energy storage or Current-Driven Technology (CDT) is characterized by 10,000 X higher energy density than VDT and has a great number of other substantial advantages, but it has all but been neglected for all of these decades. The uniform explanation for neglect of CDT technology is invariably that the industry has never been able to make an effective opening switch, which is essential for the use of CDT. Most approaches to opening switches have involved plasma of one sort or another. On a large scale, gaseous plasmas have been used as a conductor to bridge the switch electrodes that provides an opening function when the current wave front propagates through to the output end of the plasma and fully magnetizes the plasma - this is called a Plasma Opening Switch (POS). Opening can be triggered in a POS using a magnetic field to push the plasma out of the A-K gap - this is called a Magnetically Controlled Plasma Opening Switch (MCPOS). On a small scale, depletion of electron plasmas in semiconductor devices is used to affect opening switch behavior, but these devices are relatively low voltage and low current compared to the hundreds of kilo-volts and tens of kilo-amperes of interest to pulsed power. This work is an investigation into an entirely new approach to opening switch technology that utilizes new materials in new ways. The new materials are Ferroelectrics and using them as an opening switch is a stark contrast to their traditional applications in optics and transducer applications. Emphasis is on use of high performance ferroelectrics with the objective of developing an opening switch that would be suitable for large scale pulsed power applications. Over the course of exploring this new ground, we have discovered new behaviors and properties of these materials that were here to fore unknown. Some of

  13. Power Spectral Density Specification and Analysis of Large Optical Surfaces

    NASA Technical Reports Server (NTRS)

    Sidick, Erkin

    2009-01-01

    The 2-dimensional Power Spectral Density (PSD) can be used to characterize the mid- and the high-spatial frequency components of the surface height errors of an optical surface. We found it necessary to have a complete, easy-to-use approach for specifying and evaluating the PSD characteristics of large optical surfaces, an approach that allows one to specify the surface quality of a large optical surface based on simulated results using a PSD function and to evaluate the measured surface profile data of the same optic in comparison with those predicted by the simulations during the specification-derivation process. This paper provides a complete mathematical description of PSD error, and proposes a new approach in which a 2-dimentional (2D) PSD is converted into a 1-dimentional (1D) one by azimuthally averaging the 2D-PSD. The 1D-PSD calculated this way has the same unit and the same profile as the original PSD function, thus allows one to compare the two with each other directly.

  14. Optical metrology devices for high-power laser large optics

    NASA Astrophysics Data System (ADS)

    Daurios, J.; Bouillet, S.; Gaborit, G.; Poncetta, J. C.

    2007-06-01

    High power laser systems such as the LMJ laser or the LIL laser, its prototype, require large optical components with very strict and various specifications. Technologies used for the fabrication of these components are now usually compatible of such specifications, but need the implementation at the providers' sites of different kind of metrology like interferometry, photometry, surface inspection, etc., systematically performed on the components. So, during the production for the LIL and now for the LMJ, CEA has also equipped itself with a wide range of specific metrology devices used to verify the effective quality of these large optics. These various systems are now used to characterize and validate the LMJ vendors' processes or to perform specific controls dedicated to analyzes which are going further than the simple "quality control" of the component (mechanical mount effect, environment effect, ageing effect,...). After a short introduction on the LMJ laser and corresponding optical specifications for components, we will focus on different metrology devices concerning interferometry and photometry measurements or surface inspection. These systems are individually illustrated here by the mean of different results obtained during controls done in the last few years.

  15. 77 FR 24949 - Red River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC; Notice of Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... Energy Regulatory Commission Red River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC... affected by issuance of a license for the proposed Red River Lock & Dam No. 4 Hydroelectric Project No... Hydroelectric LLC, as applicant for the proposed Red River Lock & Dam No. 4 Project No. 12757, is invited...

  16. Indian River Hydroelectric Project Grant

    SciTech Connect

    Rebecca Garrett

    2005-04-29

    This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

  17. Satellite observations of large power plants and megacities from GOSAT

    NASA Astrophysics Data System (ADS)

    Oda, Tom; Maksyutov, Shamil; Boesch, Hartmut; Butz, Andre; Ganshin, Alexander; Guerlet, Sandrine; Parker, Robert; O'Dell, Chris; Oshchepkov, Sergey; Yoshida, Yukio; Zhuravlev, Ruslan; Yokota, Tatsuya

    2013-04-01

    Fossil fuel CO2 emissions are a major source of CO2 to the global carbon cycle over decadal time scales and international efforts to curb those missions are required for mitigating climate change. Although emissions from nations are estimated and reported to help monitor their compliance of emission reductions, we still lack an objective method to monitor emissions directly. Future carbon-observing space missions are thus expected to provide an independent tool for directly measuring emissions. We proposed and have implemented satellite observations specifically over intense large point sources (LPS), including large fossil-fueled power plants and megacities, worldwide (N > 300) using the Japanese Greenhouse Gases Observing SATelllite (GOSAT). Our target LPS sites have been occasionally included in the observation schedule of GOSAT and the measurements are made using the target observation mode. This proposal was officially accepted by the GOSAT project office and we have attempted to use these data to detect signatures of man-made greenhouse gas emissions. We have submitted our locations of interest on a monthly basis two month prior to observation. We calculated the X_CO2 concentration enhancement due to the LPS emissions. We analyzed GOSAT X_CO2 retrievals from four research groups (five products total): the National Institute for Environmental Studies (NIES) (both the NIES standard Level 2 and NIES-PPDF products), the NASA Atmospheric CO2 from Space (ACOS) team (ACOS Level 2 product), the Netherlands Institute for Space Research (SRON)/Karlsruhe Institute of Technology, Germany (RemoTeC), and the University of Leicester, UK (Full-Physics CO2 retrieval dataset). Although we obtained fewer retrieved soundings relative to what we requested (probably due to geophysical difficulties in the retrievals), we did obtain statistically significant enhancements at some LPS sites where weather condition were ideal for viewing. We also implemented simulations of enhanced X

  18. Development of management technology for large power systems. [of spacecraft

    NASA Technical Reports Server (NTRS)

    Decker, D. K.; Messner, A.; Graves, J.

    1982-01-01

    Autonomous power management has been proposed as a method to perform optimization of power subsystem performance in connection with the management of multikilowatt space platforms. A concept for a 250-kW utility-type power subsystem was developed. A Cassegrain concentrator solar array primary source is conditioned by a solar array switching unit which supplies seventeen 220 +20 Vdc power channels. A power management subsystem provides the monitoring and control of the overall electrical power subsystem. The discussed system concept for autonomous management of high power space platforms utilizes on-board microprocessors in a decentralized data management architecture. A data bus protocol and a data bus contention resolution scheme were selected in conjunction with the dencentralized management architecture.

  19. Enlarging the underground hydroelectric plant at Villarino, Spain

    SciTech Connect

    Oriard, L.L.

    1997-05-01

    Near the village of Villarino de los Aires, in the province of Salamanca, Spain, was an existing underground hydroelectric power plant. A major enlargement was undertaken to increase the electrical generating capacity, under a contract awarded to a joint venture of Dragados y Construcciones, S. A. (Spain), Entrecanales y Tavora, S. A. (Spain), and S.A. Conrad Zschokke (Switzerland). The enlargement required the excavation of a large and complex underground system of tunnels, shafts and chambers adjacent to existing facilities and interconnected with these facilities. The existing machine hall and transformer chamber were both extended, requiring the blasting of the existing end walls. The drilling, blasting and excavating of the underground system had to be done without damage to existing underground chambers and tunnels, or any of the existing structures, equipment or instrumentation facilities, often within just a few feet of the blasting. This required careful control of vibrations, airblast overpressures and dust. Because the only available non-electric detonating systems were found to be unreliable and unsafe, electric systems would be preferred if they could be used in a safe manner at this site. High electrical potentials existed at the site, and the facilities could not be shut down. Electrical fields were studied carefully, both in the underground environment and above the ground surface. Based on these results, it was concluded that electric detonators could be used if special blasting procedures were developed and followed. In accord with contracting practices of this Spanish agency, the contract was not awarded to the lowest bidder, but to the bidder who demonstrated the best understanding of the project and who presented the best technical proposal for conducting the work to a conclusion that would be satisfactory to the owner. The development of the technical proposal was a two-month effort for a technical group and support staff, prepared in Madrid.

  20. Medium power voltage multipliers with a large number of stages

    NASA Technical Reports Server (NTRS)

    Harrigill, W. T.; Myers, I. T.

    1978-01-01

    Voltage multiplier techniques are extended at medium power levels to larger multiplication ratios. A series of dc-dc converters were built, with from 20 to 45 stages and with power levels up to 100 watts. Maximum output voltages were about 10,000 volts.

  1. Security, protection, and control of power systems with large-scale wind power penetration

    NASA Astrophysics Data System (ADS)

    Acharya, Naresh

    As the number of wind generation facilities in the utility system is fast increasing, many issues associated with their integration into the power system are beginning to emerge. Of the various issues, this dissertation deals with the development of new concepts and computational methods to handle the transmission issues and voltage issues caused by large-scale integration of wind turbines. This dissertation also formulates a probabilistic framework for the steady-state security assessment of wind power incorporating the forecast uncertainty and correlation. Transmission issues are mainly related to the overloading of transmission lines, when all the wind power generated cannot be delivered in full due to prior outage conditions. To deal with this problem, a method to curtail the wind turbine outputs through Energy Management System facilities in the on-line operational environment is proposed. The proposed method, which is based on linear optimization, sends the calculated control signals via the Supervisory Control and Data Acquisition system to wind farm controllers. The necessary ramping of the wind farm outputs is implemented either by the appropriate blade pitch angle control at the turbine level or by switching a certain number of turbines. The curtailment strategy is tested with an equivalent system model of MidAmerican Energy Company. The results show that the line overload in high wind areas can be alleviated by controlling the outputs of the wind farms step-by-step over an allowable period of time. A low voltage event during a system fault can cause a large number of wind turbines to trip, depending on voltages at the wind turbine terminals during the fault and the under-voltage protection setting of wind turbines. As a result, an N-1 contingency may evolve into an N-(K+1) contingency, where K is the number of wind farms tripped due to low voltage conditions. Losing a large amount of wind power following a line contingency might lead to system

  2. 14 CFR 135.365 - Large transport category airplanes: Reciprocating engine powered: Weight limitations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... category airplanes: Reciprocating engine powered: Weight limitations. (a) No person may take off a... may take off a reciprocating engine powered large transport category airplane for an airport of... may take off a reciprocating engine powered large transport category airplane at a weight more...

  3. Design considerations for large space electric power systems

    NASA Technical Reports Server (NTRS)

    Renz, D. D.; Finke, R. C.; Stevens, N. J.; Triner, J. E.; Hansen, I. G.

    1983-01-01

    As power levels of spacecraft rise to the 50 to 100 kW range, it becomes apparent that low voltage (28 V) dc power distribution and management systems will not operate efficiently at these higher power levels. The concept of transforming a solar array voltage at 150 V dc into a 1000 V ac distribution system operating at 20 kHz is examined. The transformation is accomplished with series-resonant inverter by using a rotary transformer to isolate the solar array from the spacecraft. The power can then be distributed in any desired method such as three phase delta to delta. The distribution voltage can be easily transformed to any desired load voltage and operating frequency. The reasons for the voltage limitations on the solar array due to plasma interactions and the many advantages of a high voltage, high frequency at distribution system are discussed.

  4. Hydroelectric structures studies using 3-dimensional methods

    SciTech Connect

    Harrell, T.R.; Jones, G.V.; Toner, C.K. )

    1989-01-01

    Deterioration and degradation of aged, hydroelectric project structures can significantly affect the operation and safety of a project. In many cases, hydroelectric headworks (in particular) have complicated geometrical configurations, loading patterns and hence, stress conditions. An accurate study of such structures can be performed using 3-dimensional computer models. 3-D computer models can be used for both stability evaluation and for finite element stress analysis. Computer aided engineering processes facilitate the use of 3-D methods in both pre-processing and post-processing of data. Two actual project examples are used to emphasize the authors' points.

  5. Large scale power suppression in a multifield landscape

    NASA Astrophysics Data System (ADS)

    Blanco-Pillado, Jose J.; Dias, Mafalda; Frazer, Jonathan; Sousa, Kepa

    2015-08-01

    Power suppression of the cosmic microwave background on the largest observable scales could provide valuable clues about the particle physics underlying inflation. Here we consider the prospect of power suppression in the context of the multifield landscape. Based on the assumption that our observable universe emerges from a tunnelling event and that the relevant features originate purely from inflationary dynamics, we find that the power spectrum not only contains information on single-field dynamics, but also places strong constraints on all scalar fields present in the theory. We find that the simplest single-field models giving rise to power suppression do not generalise to multifield models in a straightforward way, as the resulting superhorizon evolution of the curvature perturbation tends to erase any power suppression present at horizon crossing. On the other hand, multifield effects do present a means of generating power suppression which to our knowledge has so far not been considered. We propose a mechanism to illustrate this, which we dub flume inflation.

  6. Pattern of injuries in a hydro-electric project.

    PubMed

    Malhotra, P; Dhar, S; Dogra, S; Kaul, S; Raina, R K

    1995-05-01

    A study of work-related injuries at a hydro-electric project site (May 1991-April 1992) was undertaken to determine the incidence and pattern of the injuries out of a total number of 119 injuries in the year. A significant proportion of these were orthopaedic in nature and the commonest site of injury was limbs (both upper and lower limbs) like auto-amputations and head injuries. A large proportion of these accidents (24.37%) resulted in permanent disability likely to interfere in the normal activities or locomotion of those injured. PMID:8834138

  7. 14 CFR 135.367 - Large transport category airplanes: Reciprocating engine powered: Takeoff limitations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Large transport category airplanes....367 Large transport category airplanes: Reciprocating engine powered: Takeoff limitations. (a) No person operating a reciprocating engine powered large transport category airplane may take off...

  8. 14 CFR 135.367 - Large transport category airplanes: Reciprocating engine powered: Takeoff limitations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Large transport category airplanes....367 Large transport category airplanes: Reciprocating engine powered: Takeoff limitations. (a) No person operating a reciprocating engine powered large transport category airplane may take off...

  9. 14 CFR 91.1037 - Large transport category airplanes: Turbine engine powered; Limitations; Destination and...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Large transport category airplanes: Turbine....1037 Large transport category airplanes: Turbine engine powered; Limitations; Destination and alternate airports. (a) No program manager or any other person may permit a turbine engine powered large...

  10. 14 CFR 135.385 - Large transport category airplanes: Turbine engine powered: Landing limitations: Destination...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Large transport category airplanes: Turbine....385 Large transport category airplanes: Turbine engine powered: Landing limitations: Destination airports. (a) No person operating a turbine engine powered large transport category airplane may take...

  11. 14 CFR 91.1037 - Large transport category airplanes: Turbine engine powered; Limitations; Destination and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Large transport category airplanes: Turbine....1037 Large transport category airplanes: Turbine engine powered; Limitations; Destination and alternate airports. (a) No program manager or any other person may permit a turbine engine powered large...

  12. 14 CFR 91.1037 - Large transport category airplanes: Turbine engine powered; Limitations; Destination and...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Large transport category airplanes: Turbine....1037 Large transport category airplanes: Turbine engine powered; Limitations; Destination and alternate airports. (a) No program manager or any other person may permit a turbine engine powered large...

  13. 14 CFR 91.1037 - Large transport category airplanes: Turbine engine powered; Limitations; Destination and...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Large transport category airplanes: Turbine....1037 Large transport category airplanes: Turbine engine powered; Limitations; Destination and alternate airports. (a) No program manager or any other person may permit a turbine engine powered large...

  14. 14 CFR 135.385 - Large transport category airplanes: Turbine engine powered: Landing limitations: Destination...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Large transport category airplanes: Turbine....385 Large transport category airplanes: Turbine engine powered: Landing limitations: Destination airports. (a) No person operating a turbine engine powered large transport category airplane may take...

  15. 14 CFR 91.1037 - Large transport category airplanes: Turbine engine powered; Limitations; Destination and...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Large transport category airplanes: Turbine....1037 Large transport category airplanes: Turbine engine powered; Limitations; Destination and alternate airports. (a) No program manager or any other person may permit a turbine engine powered large...

  16. 14 CFR 135.385 - Large transport category airplanes: Turbine engine powered: Landing limitations: Destination...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Large transport category airplanes: Turbine....385 Large transport category airplanes: Turbine engine powered: Landing limitations: Destination airports. (a) No person operating a turbine engine powered large transport category airplane may take...

  17. 14 CFR 135.385 - Large transport category airplanes: Turbine engine powered: Landing limitations: Destination...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Large transport category airplanes: Turbine....385 Large transport category airplanes: Turbine engine powered: Landing limitations: Destination airports. (a) No person operating a turbine engine powered large transport category airplane may take...

  18. 14 CFR 135.367 - Large transport category airplanes: Reciprocating engine powered: Takeoff limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Large transport category airplanes....367 Large transport category airplanes: Reciprocating engine powered: Takeoff limitations. (a) No person operating a reciprocating engine powered large transport category airplane may take off...

  19. 14 CFR 135.387 - Large transport category airplanes: Turbine engine powered: Landing limitations: Alternate airports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Large transport category airplanes: Turbine....387 Large transport category airplanes: Turbine engine powered: Landing limitations: Alternate... alternate airport for a turbine engine powered large transport category airplane unless (based on...

  20. 14 CFR 135.387 - Large transport category airplanes: Turbine engine powered: Landing limitations: Alternate airports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Large transport category airplanes: Turbine....387 Large transport category airplanes: Turbine engine powered: Landing limitations: Alternate... alternate airport for a turbine engine powered large transport category airplane unless (based on...

  1. 14 CFR 135.387 - Large transport category airplanes: Turbine engine powered: Landing limitations: Alternate airports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Large transport category airplanes: Turbine....387 Large transport category airplanes: Turbine engine powered: Landing limitations: Alternate... alternate airport for a turbine engine powered large transport category airplane unless (based on...

  2. 14 CFR 135.387 - Large transport category airplanes: Turbine engine powered: Landing limitations: Alternate airports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Large transport category airplanes: Turbine....387 Large transport category airplanes: Turbine engine powered: Landing limitations: Alternate... alternate airport for a turbine engine powered large transport category airplane unless (based on...

  3. 1. GENERAL VIEW OF SHOSHONE HYDROELECTRIC PLANT IN GLENWOOD CANYON, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. GENERAL VIEW OF SHOSHONE HYDROELECTRIC PLANT IN GLENWOOD CANYON, VIEW TO THE NORTHEAST ALONG U.S. 6 AND THE COLORADO RIVER. - Shoshone Hydroelectric Plant Complex, 60111 U.S. Highway 6, Garfield County, CO

  4. Big Creek Hydroelectric System, East & West Transmission Line, 241mile ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Big Creek Hydroelectric System, East & West Transmission Line, 241-mile transmission corridor extending between the Big Creek Hydroelectric System in the Sierra National Forest in Fresno County and the Eagle Rock Substation in Los Angeles, California, Visalia, Tulare County, CA

  5. 5. VIEW NORTH OF EARTHEN DIKE WITH HYDROELECTRIC GENERATING FACILITY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. VIEW NORTH OF EARTHEN DIKE WITH HYDROELECTRIC GENERATING FACILITY TO LEFT - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  6. 15. VIEW SOUTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE PIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW SOUTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE PIT TO RIGHT AND POWERHOUSE TO LEFT - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  7. 3. VIEW EAST, DETAIL WEST FRONT OF HYDROELECTRIC POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW EAST, DETAIL WEST FRONT OF HYDROELECTRIC POWERHOUSE - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  8. 1. WEST FRONT OF HYDROELECTRIC POWERHOUSE WITH INTAKE STRUCTURE, CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. WEST FRONT OF HYDROELECTRIC POWERHOUSE WITH INTAKE STRUCTURE, CANAL SPILLWAY AT LEFT CENTER, VIEW EAST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  9. Dams in the Amazon: Belo Monte and Brazil's Hydroelectric Development of the Xingu River Basin

    NASA Astrophysics Data System (ADS)

    Fearnside, Phillip M.

    2006-07-01

    Hydroelectric dams represent major investments and major sources of environmental and social impacts. Powerful forces surround the decision-making process on public investments in the various options for the generation and conservation of electricity. Brazil’s proposed Belo Monte Dam (formerly Kararaô) and its upstream counterpart, the Altamira Dam (better known by its former name of Babaquara) are at the center of controversies on the decision-making process for major infrastructure projects in Amazonia. The Belo Monte Dam by itself would have a small reservoir area (440 km2) and large installed capacity (11, 181.3 MW), but the Altamira/Babaquara Dam that would regulate the flow of the Xingu River (thereby increasing power generation at Belo Monte) would flood a vast area (6140 km2). The great impact of dams provides a powerful reason for Brazil to reassess its current policies that allocate large amounts of energy in the country’s national grid to subsidized aluminum smelting for export. The case of Belo Monte and the five additional dams planned upstream (including the Altamira/Babaquara Dam) indicate the need for Brazil to reform its environmental assessment and licensing system to include the impacts of multiple interdependent projects.

  10. Dams in the Amazon: Belo Monte and Brazil's hydroelectric development of the Xingu River Basin.

    PubMed

    Fearnside, Phillip M

    2006-07-01

    Hydroelectric dams represent major investments and major sources of environmental and social impacts. Powerful forces surround the decision-making process on public investments in the various options for the generation and conservation of electricity. Brazil's proposed Belo Monte Dam (formerly Kararaô) and its upstream counterpart, the Altamira Dam (better known by its former name of Babaquara) are at the center of controversies on the decision-making process for major infrastructure projects in Amazonia. The Belo Monte Dam by itself would have a small reservoir area (440 km2) and large installed capacity (11, 181.3 MW), but the Altamira/Babaquara Dam that would regulate the flow of the Xingu River (thereby increasing power generation at Belo Monte) would flood a vast area (6140 km2). The great impact of dams provides a powerful reason for Brazil to reassess its current policies that allocate large amounts of energy in the country's national grid to subsidized aluminum smelting for export. The case of Belo Monte and the five additional dams planned upstream (including the Altamira/Babaquara Dam) indicate the need for Brazil to reform its environmental assessment and licensing system to include the impacts of multiple interdependent projects. PMID:16738820

  11. Large scale environmental applications of high power ultrasound.

    PubMed

    Collings, A F; Gwan, P B; Sosa-Pintos, A P

    2010-08-01

    In the present work, the use of high power ultrasound as a process tool for the removal of persistent organic pollutants (POPs) from soil and the treatment of bauxite red mud waste from the Bayer process is discussed. Laboratory scale experiments have confirmed that the application of high power ultrasound to slurries of contaminated soil and of bauxite ore can treat two major environmental problems cost-effectively. Destruction rates of POPs in soil of 90% and higher have been achieved whereas 85% iron oxide has been extracted from red mud waste leaving a low-iron fraction of approximately 50% by weight which is more environmentally friendly. A 4x4 kW pilot plant capable of treating 2.5 tonnes of slurry per day has been commissioned to provide more accurate estimates of power and energy requirements to allow scale-up to industrial use. PMID:20153236

  12. Aging assessment of large electric motors in nuclear power plants

    SciTech Connect

    Villaran, M.; Subudhi, M.

    1996-03-01

    Large electric motors serve as the prime movers to drive high capacity pumps, fans, compressors, and generators in a variety of nuclear plant systems. This study examined the stressors that cause degradation and aging in large electric motors operating in various plant locations and environments. The operating history of these machines in nuclear plant service was studied by review and analysis of failure reports in the NPRDS and LER databases. This was supplemented by a review of motor designs, and their nuclear and balance of plant applications, in order to characterize the failure mechanisms that cause degradation, aging, and failure in large electric motors. A generic failure modes and effects analysis for large squirrel cage induction motors was performed to identify the degradation and aging mechanisms affecting various components of these large motors, the failure modes that result, and their effects upon the function of the motor. The effects of large motor failures upon the systems in which they are operating, and on the plant as a whole, were analyzed from failure reports in the databases. The effectiveness of the industry`s large motor maintenance programs was assessed based upon the failure reports in the databases and reviews of plant maintenance procedures and programs.

  13. Large active retrodirective arrays for solar power satellites

    NASA Technical Reports Server (NTRS)

    Chernoff, R.

    1978-01-01

    An active retrodirective array (ARA) transmits a beam toward the apparent source of an illuminating signal called the pilot. The array produces the RF power. Retrodirectivity is achieved by retransmitting from each element of the array a signal whose phase is the 'conjugate' of that received by the element. Application of the ARA to the solar power satellite concept has been proposed. A method of providing a reference phase is described, called 'central phasing', which eliminates the need for a rigid structure ordinarily needed in order to realize accurate retrodirectivity.

  14. Methane and CO2 emissions from China's hydroelectric reservoirs: a new quantitative synthesis.

    PubMed

    Li, Siyue; Zhang, Quanfa; Bush, Richard T; Sullivan, Leigh A

    2015-04-01

    Controversy surrounds the green credentials of hydroelectricity because of the potentially large emission of greenhouse gases (GHG) from associated reservoirs. However, limited and patchy data particularly for China is constraining the current global assessment of GHG releases from hydroelectric reservoirs. This study provides the first evaluation of the CO2 and CH4 emissions from China's hydroelectric reservoirs by considering the reservoir water surface and drawdown areas, and downstream sources (including spillways and turbines, as well as river downstream). The total emission of 29.6 Tg CO2/year and 0.47 Tg CH4/year from hydroelectric reservoirs in China, expressed as CO2 equivalents (eq), corresponds to 45.6 Tg CO2eq/year, which is 2-fold higher than the current GHG emission (ca. 23 Tg CO2eq/year) from global temperate hydropower reservoirs. China's average emission of 70 g CO2eq/kWh from hydropower amounts to 7% of the emissions from coal-fired plant alternatives. China's hydroelectric reservoirs thus currently mitigate GHG emission when compared to the main alternative source of electricity with potentially far great reductions in GHG emissions and benefits possible through relatively minor changes to reservoir management and design. On average, the sum of drawdown and downstream emission including river reaches below dams and turbines, which is overlooked by most studies, represents the equivalent of 42% of the CO2 and 92% of CH4 that emit from hydroelectric reservoirs in China. Main drivers on GHG emission rates are summarized and highlight that water depth and stratification control CH4 flux, and CO2 flux shows significant negative relationships with pH, DO, and Chl-a. Based on our finding, a substantial revision of the global carbon emissions from hydroelectric reservoirs is warranted. PMID:25618308

  15. Gated Si nanowires for large thermoelectric power factors

    NASA Astrophysics Data System (ADS)

    Neophytou, Neophytos; Kosina, Hans

    2014-08-01

    We investigate the effect of electrostatic gating on the thermoelectric power factor of p-type Si nanowires (NWs) of up to 20 nm in diameter in the [100], [110], and [111] crystallographic transport orientations. We use atomistic tight-binding simulations for the calculation of the NW electronic structure, coupled to linearized Boltzmann transport equation for the calculation of the thermoelectric coefficients. We show that gated NW structures can provide ˜5× larger thermoelectric power factor compared to doped channels, attributed to their high hole phonon-limited mobility, as well as gating induced bandstructure modifications which further improve mobility. Despite the fact that gating shifts the charge carriers near the NW surface, surface roughness scattering is not strong enough to degrade the transport properties of the accumulated hole layer. The highest power factor is achieved for the [111] NW, followed by the [110], and finally by the [100] NW. As the NW diameter increases, the advantage of the gated channel is reduced. We show, however, that even at 20 nm diameters (the largest ones that we were able to simulate), a ˜3× higher power factor for gated channels is observed. Our simulations suggest that the advantage of gating could still be present in NWs with diameters of up to ˜40 nm.

  16. Gated Si nanowires for large thermoelectric power factors

    SciTech Connect

    Neophytou, Neophytos; Kosina, Hans

    2014-08-18

    We investigate the effect of electrostatic gating on the thermoelectric power factor of p-type Si nanowires (NWs) of up to 20 nm in diameter in the [100], [110], and [111] crystallographic transport orientations. We use atomistic tight-binding simulations for the calculation of the NW electronic structure, coupled to linearized Boltzmann transport equation for the calculation of the thermoelectric coefficients. We show that gated NW structures can provide ∼5× larger thermoelectric power factor compared to doped channels, attributed to their high hole phonon-limited mobility, as well as gating induced bandstructure modifications which further improve mobility. Despite the fact that gating shifts the charge carriers near the NW surface, surface roughness scattering is not strong enough to degrade the transport properties of the accumulated hole layer. The highest power factor is achieved for the [111] NW, followed by the [110], and finally by the [100] NW. As the NW diameter increases, the advantage of the gated channel is reduced. We show, however, that even at 20 nm diameters (the largest ones that we were able to simulate), a ∼3× higher power factor for gated channels is observed. Our simulations suggest that the advantage of gating could still be present in NWs with diameters of up to ∼40 nm.

  17. Achievable flatness in a large microwave power antenna study

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Achievable flatness for the microwave power transmission system antenna array was determined. Two configurations were analyzed in detail and evaluated as to their net potential misalignment. Manufacturing, joint slack, assembly, alignment and environmental aspects were considered. Approaches to each aspect were analyzed to minimize their contributions to distortions.

  18. 75 FR 4058 - CRD Hydroelectric, LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    .... c. Date filed: February 24, 2009. d. Applicant: CRD Hydroelectric, LLC. e. Name of Project: Red Rock... located at the U.S. Army Corps of Engineers Red Rock Dam. g. Filed Pursuant to: Federal Power Act 16 U.S.C... now ready for environmental analysis. l. The proposed Red Rock Project would be located at...

  19. Legal obstacles and incentives to the development of small scale hydroelectric projects in Massachusetts

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small scale hydroelectric energy at the state level are discussed. The discussion is designed to aid the developer in the determination of which permits, licenses, and laws of the state must be secured or complied with for the development of a project. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Specific sections that follow are: Massachusetts Water Law; Licensing, Permitting, and Review Procedures; Indirect Considerations (by departments); Department of Public Utilities Regulation of Privately Owned Electric Utilities; Massachusetts Municipal Wholesale Electric Company; Miscellaneous Legal Issues Relating to Low-Head Hydroelectric Power; and Financial Considerations.

  20. Jet engine powers large, high-temperature wind tunnel

    NASA Technical Reports Server (NTRS)

    Benham, T. F.; Mulliken, S. R.

    1967-01-01

    Wind tunnel for large component testing uses a jet engine with afterburner to provide high temperatures /1200 degrees to 2000 degrees F/ and controlled high velocity gas. This economical wind tunnel can accommodate parts ten feet by ten feet or larger, and is a useful technique for qualitative information.

  1. Low-Power Architectures for Large Radio Astronomy Correlators

    NASA Technical Reports Server (NTRS)

    D'Addario, Larry R.

    2011-01-01

    The architecture of a cross-correlator for a synthesis radio telescope with N greater than 1000 antennas is studied with the objective of minimizing power consumption. It is found that the optimum architecture minimizes memory operations, and this implies preference for a matrix structure over a pipeline structure and avoiding the use of memory banks as accumulation registers when sharing multiply-accumulators among baselines. A straw-man design for N = 2000 and bandwidth of 1 GHz, based on ASICs fabricated in a 90 nm CMOS process, is presented. The cross-correlator proper (excluding per-antenna processing) is estimated to consume less than 35 kW.

  2. Large Area Dust Detector onboard Solar Power Sail Spacecraft

    NASA Astrophysics Data System (ADS)

    Yano, Hajime

    JAXA is aiming to launch the solar power sail engineering demonstrator to the outer planet region of the solar system like Jupiter and the Jovian Trojan asteroids in 2010's. Its interplanetary cruise is a relevant and rare opportunity to monitor physical properties that may be varied by heliocentric distances continuously such as solar wind, solar magnetosphere and micrometeoroid flux. We have been developing the largest but still light-weight dust detector ever to be onboard deep space probes since 2000. PVDF films of a few to 10's of micron thickness are attached as a small part of the solar sail membrane to count and time hypervelocity impacts by micrometeoroids larger than micron size. The first spaceflight test of this dust detector in the order of 100 cm2 detection area was conducted onboard SSSAT (Solar Sail Satellite) as the M-V sub-payload launched to LEO in September 2006. The second opportunity of this series will be the 4- channel impact sensors onboard Kagayaki nano-satellite as an H-IIA piggyback to be launched in 2008. Actual interplanetary measurements can be achieved by the Small Solar Power Sail Demonstrator that will go inside the orbit of the Earth (1 AU) close to Venus around 2010. On this spacecraft, the 8-channel PVDF sensors of about 1 m2 detection area will be onboard to test this system in the interplanetary operation and to hopefully measure dust flux anisotropy in the trailing edge of the Earth, heliocentric flux variance inside 1 AU, and opportunistic detections of possible cometary dust trails and flux enhancement near Venus. The sensors filter electronic, thermal and vibration noises and record time, peak hold value, and relax duration of signals of micrometeoroid impacts. When the full-size solar power sail mission goes beyond 1 AU passing the main asteroid belt to 5 AU in 2010's, this dust detector system will be onboard in the order of several m2 active area. It will also compare its results with infrared observation of zodiacal

  3. 77 FR 53177 - Large Power Transformers From the Republic of Korea: Antidumping Duty Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... Transformers from the Republic of Korea: Final Determination of Sales at Less Than Fair Value, 77 FR 40857... International Trade Administration Large Power Transformers From the Republic of Korea: Antidumping Duty Order... antidumping duty order on large power transformers from the Republic of Korea (Korea). FOR FURTHER...

  4. 14 CFR 135.379 - Large transport category airplanes: Turbine engine powered: Takeoff limitations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Large transport category airplanes: Turbine... category airplanes: Turbine engine powered: Takeoff limitations. (a) No person operating a turbine engine... existing at take- off. (b) No person operating a turbine engine powered large transport category...

  5. 14 CFR 135.379 - Large transport category airplanes: Turbine engine powered: Takeoff limitations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Large transport category airplanes: Turbine... category airplanes: Turbine engine powered: Takeoff limitations. (a) No person operating a turbine engine... existing at take- off. (b) No person operating a turbine engine powered large transport category...

  6. 14 CFR 135.379 - Large transport category airplanes: Turbine engine powered: Takeoff limitations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Large transport category airplanes: Turbine... category airplanes: Turbine engine powered: Takeoff limitations. (a) No person operating a turbine engine... existing at take- off. (b) No person operating a turbine engine powered large transport category...

  7. 14 CFR 135.379 - Large transport category airplanes: Turbine engine powered: Takeoff limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Large transport category airplanes: Turbine... category airplanes: Turbine engine powered: Takeoff limitations. (a) No person operating a turbine engine... existing at take- off. (b) No person operating a turbine engine powered large transport category...

  8. Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Phase 1, Volume Two (B), Clark Fork River Projects, Cabinet Gorge and Noxon Rapids Dams, Operator, Washington Water Power Company.

    SciTech Connect

    Wood, Marilyn

    1984-06-01

    This report documents best available information concerning the wildlife species impacted and the degree of the impact. A target species list was developed to focus the impact assessment and to direct mitigation efforts. Many non-target species also incurred impacts but are not discussed in this report. All wildlife habitats inundated by the two reservoirs are represented by the target species. It was assumed the numerous non-target species also affected will be benefited by the mitigation measures adopted for the target species. Impacts addressed are limited to those directly attributable to the loss of habitat and displacement of wildlife populations due to the construction and operation of the two hydroelectric projects. Secondary impacts, such as the relocation of railroads and highways, and the increase of the human population, were not considered. In some cases, both positive and negative impacts were assessed; and the overall net effect was reported. The loss/gain estimates reported represent impacts considered to have occurred during one point in time except where otherwise noted. When possible, quantitative estimates were developed based on historical information from the area or on data from similar areas. Qualitative loss estimates of low, moderate, or high with supporting rationale were assessed for each species or species group.

  9. Project-X Srf, and Very Large Power Stations

    NASA Astrophysics Data System (ADS)

    Ankenbrandt, Charles M.; Johnson, Rolland P.; Popovic, Milorad

    2010-06-01

    We seek to develop accelerator-driven subcritical (ADS) nuclear power stations operating at more than 5 to 10 GW in an inherently safe region below criticality, generating no greenhouse gases, producing minimal nuclear waste and no byproducts that are useful to rogue nations or terrorists, incinerating waste from conventional nuclear reactors, and efficiently using abundant thorium fuel that does not need enrichment. First, the feasibility of the accelerator technology must be demonstrated. Fermilab is developing concepts for Project X, which would use a superconducting RF (SRF) linear proton accelerator to provide beams for particle physics at the intensity and energy frontiers. We propose to extend this linac design to serve as a prototype for a practical accelerator that can drive several ADS reactors at once and also provide beams for reactor development.

  10. Optimization of hybrid power system composed of SMES and flywheel MG for large pulsed load

    NASA Astrophysics Data System (ADS)

    Niiyama, K.; Yagai, T.; Tsuda, M.; Hamajima, T.

    2008-09-01

    A superconducting magnetic storage system (SMES) has some advantages such as rapid large power response and high storage efficiency which are superior to other energy storage systems. A flywheel motor generator (FWMG) has large scaled capacity and high reliability, and hence is broadly utilized for a large pulsed load, while it has comparatively low storage efficiency due to high mechanical loss compared with SMES. A fusion power plant such as International Thermo-Nuclear Experimental Reactor (ITER) requires a large and long pulsed load which causes a frequency deviation in a utility power system. In order to keep the frequency within an allowable deviation, we propose a hybrid power system for the pulsed load, which equips the SMES and the FWMG with the utility power system. We evaluate installation cost and frequency control performance of three power systems combined with energy storage devices; (i) SMES with the utility power, (ii) FWMG with the utility power, (iii) both SMES and FWMG with the utility power. The first power system has excellent frequency power control performance but its installation cost is high. The second system has inferior frequency control performance but its installation cost is the lowest. The third system has good frequency control performance and its installation cost is attained lower than the first power system by adjusting the ratio between SMES and FWMG.