  1. Next Generation Air Monitoring (NGAM) VOC Sensor Evaluation Report

    EPA Science Inventory

    This report summarizes the results of next generation air monitor (NGAM) volatile organic compound (VOC) evaluations performed using both laboratory as well as field scale settings. These evaluations focused on challenging lower cost (<$2500) NGAM technologies to either controlle...

  2. Umatilla Hatchery Monitoring and Evaluation, 1999-2002 Annual Report.

    SciTech Connect

    Chess, Dale W.; Cameron, William A.; Stonecypher, Jr., R. Wes

    2003-12-01

    REPORT A: UMATILLA HATCHERY MONITORING AND EVALUATION--This report summarizes monitoring and evaluation studies of salmonids reared at Umatilla Fish Hatchery (UFH) for 1 November, 1999 to 31 October, 2002. Studies at UFH are designed to evaluate rearing of chinook salmon and steelhead in ''Michigan raceways''. Characteristics of Michigan raceways include high fish densities, rapid water turnover, oxygen supplementation, reuse of water, and baffles designed to reduce cleaning. Fish health at UFH and other facilities associated with the Umatilla program are intensively monitored and evaluated along with the overall research project. Further, under the Integrated Hatchery Operations Team guidelines, specific requirements for fish health monitoring at UFH are mandatory. An experiment designed to evaluate rearing subyearling fall chinook salmon in Michigan and Oregon raceways has been completed. An evaluation of survival of subyearling fall chinook salmon reared at three densities will be completed with final returns in 2005. Two new evaluations were started during this reporting period. The first is an evaluation of spring chinook survival of groups transferred to Imeques acclimation facility in the fall, overwinter-acclimated and released with the standard acclimated production groups in March. The second is an evaluation of subyearling fall chinook survival and straying of a direct-stream released group in the lower Umatilla River and the standard group acclimated at Thornhollow acclimation facility in the upper Umatilla River. An important aspect of the project is evaluation of the spring chinook and summer steelhead fisheries in the upper and lower Umatilla River. REPORT B: Fish Health Monitoring and Evaluation, 2000 Fiscal Year--The results presented in this report are from the ninth year of Fish Health Monitoring and Evaluation in the Umatilla Hatchery program. Broodstock monitoring for hatchery production was conducted on adult returns to the Umatilla River at

  3. Umatilla Hatchery Monitoring and Evaluation, 1992-1993 Annual Report.

    SciTech Connect

    Keefe, MaryLouise; Hayes, Michael C.; Groberg, Jr., Warren J.

    1994-06-01

    The Umatilla Hatchery is the foundation for rehabilitating chinook salmon and enhancing summer steelhead in the Umatilla River and expected to contribute significantly to the Northwest Power Planning Council`s goal of doubling salmonid production in the Columbia Basin. This report covers the second year of comprehensive monitoring and evaluation of the Umatilla Hatchery. As both the hatchery and the evaluation study are in the early stages of implementation, much of the information contained in this report is preliminary.

  4. Umatilla Hatchery Monitoring and Evaluation, 1997-1998 Annual Report.

    SciTech Connect

    Hayes, Michael C.; Brown, Kassandra A.; Waln, Karen

    1999-11-01

    This report summarizes monitoring and evaluation studies of salmonids reared at Umatilla Fish Hatchery (UFH) for the period November 1, 1997 to October 31, 1998. Studies at Umatilla Hatchery are designed to evaluate rearing of chinook salmon and steelhead in ''Michigan raceways''. Characteristics of Michigan raceways include high fish densities, rapid water turnover, oxygen supplementation, reuse of water, and baffles designed to reduce cleaning. Fish health at UFH and other facilities associated with the Umatilla program are intensively monitored and evaluated as part of the overall research project. Further, under the Integrated Hatchery Operations Team guidelines, specific requirements for fish health monitoring are mandatory and have become the responsibility of the fish health staff conducting studies at UFH. Additional studies include evaluations of sport fisheries in the Umatilla River and mass marking and straying of fall chinook salmon. Except for adult recovery data, an experiment designed to evaluate rearing subyearling fall chinook salmon in Michigan and Oregon raceways has been completed. We are currently in the second year of rearing subyearling fall chinook salmon at three densities. Experimental rearing of subyearling, fall release, and yearling spring chinook salmon, and steelhead has also been conducted. Although preliminary adult return data has been recovered, data on smolt-to-adult survival for all groups is incomplete. Conclusions in this report should be viewed as preliminary and used in conjunction with additional data as it becomes available.

  5. Umatilla Hatchery Monitoring and Evaluation, 1995-1996 Annual Report.

    SciTech Connect

    Focher, Shannon M.; Carmichael, Richard W.; Hayes, Michael C.

    1997-01-01

    This report summarizes the monitoring and evaluation studies of salmonids reared at Umatilla Hatchery for the period November 1, 1995 to October 31, 1996. Studies at Umatilla Hatchery are designed to evaluate rearing of chinook salmon and steelhead in Michigan raceways. Characteristics of Michigan raceways include high fish densities, rapid water turnover, oxygen supplementation, reuse of water, and baffles designed to reduce cleaning. Fish health at Umatilla Hatchery and other facilities associated with the Umatilla program is intensively monitored and evaluated as part of the overall research project. Further, under the Integrated Hatchery Operations Team guidelines, specific requirements for fish health monitoring are mandatory and have become the responsibility of the fish health staff conducting the studies at Umatilla Hatchery. Additional studies include evaluations of sport fisheries in the Umatilla River and mass marking and straying of fall chinook salmon. Juvenile rearing experiments have been completed for subyearling fall chinook salmon reared in Michigan and Oregon raceways. Although preliminary adult return data has been recovered, the most data on post-release survival is incomplete. Conclusions in this report should be viewed as preliminary and used in conjunction with additional information as it becomes available.

  6. Umatilla Hatchery Monitoring and Evaluation, 1998-1999 Annual Report.

    SciTech Connect

    Stonecypher, R. Wess; Groberg, Jr., Warren J.; Farman, Brett M.

    2001-07-01

    the management objectives in the Umatilla River basin that are presented in the Master Plan and the Comprehensive Rehabilitation Plan. A substantial proportion of the production at UFH is reared in MI raceways. This system has not been thoroughly evaluated to determine the effects on Smolt-to-adult survival (SAS). In addition, the rearing strategies proposed for spring chinook salmon require an unusually extensive period of incubation in chilled well water. Extensive background and justification for UFH monitoring and evaluation is presented in Carmichael (1990). In this report, we present findings for the UFH Monitoring and Evaluation Project from 1 November 1998 to 31 October 1999. We designed our program to evaluate fish cultural practices, conduct rearing and survival studies, assess sport fisheries, and provide information for planning and coordination. Additional studies have been designed for fall chinook salmon to evaluate straying and the effects of tagging. We monitored the culture and performance of more than 3.2 million chinook salmon and steelhead produced at UFH in 1997-98 (Appendix Tables A1-8). Individual stock profiles, release, performance, and return data of previously released groups are presented in the following sections.

  7. Monitored retrievable storage facility site screening and evaluation report

    SciTech Connect

    none,

    1985-05-01

    The Nuclear Waste Policy Act of 1982 directs the Department of Energy to complete a detailed study of the need for and feasibility of, and to submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high level radioactive waste and spent nuclear fuel.'' The Act directs that the proposal includes site specific designs. Further, the proposal is to include, for the first such facility, at least three alternative sites and at least five alternative combinations of such proposed sites and facility designs{hor ellipsis}'' as well as a recommendation of the combination among the alternatives that the Secretary deems preferable.'' An MRS Site Screening Task Force has been formed to help identify and evaluate potential MRS facility sites within a preferred region and with the application of a siting process and criteria developed by the DOE. The activities of the Task Force presented in this report include: site evaluations (sections 10 through 12) where the rationale for the site evaluations are presented, along with each evaluation and findings of the Task Force. This in Volume 2 of a three volume document.

  8. Monitored Retrievable Storage facility site screening and evaluation report

    SciTech Connect

    none,

    1985-05-01

    The Nuclear Waste Policy Act of 1982 directs the Department of Energy to complete a detailed study of the need for and feasibility of, and to submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high level radioactive waste and spent nuclear fuel.'' The Act directs that the proposal includes site specific designs. Further, the proposal is to include, for the first such facility, at least three alternative sites and at least five alternative combinations of such proposed sites and facility designs {hor ellipsis}'' as well as a recommendation of the combination among the alternatives that the Secretary deems preferable.'' An MRS Site Screening Task Force has been formed to help identify and evaluate potential MRS facility sites within a preferred region and with the application of a siting process and criteria developed by the DOE. The activities of the Task Force presented in this report, all site evaluations (sections 13 through 16) where the rationale for the site evaluations are presented, along with each evaluation and findings of the Task Force. This is Volume 3 of a three volume document. References are also included in this volume.

  9. Monitored retrievable storage facility site screening and evaluation report

    SciTech Connect

    none,

    1985-05-01

    The Nuclear Waste Policy Act of 1982 directs the Department of Energy to complete a detailed study of the need for and feasibility of, and to submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high level radioactive waste and spent nuclear fuel.'' The Act directs that the proposal includes site specific designs. Further, the proposal is to include, for the first such facility, at least three alternative sites and at least five alternative combinations of such proposed site and facility designs...'' as well as a recommendation of the combination among the alternatives that the Secretary deems preferable.'' An MRS Site Screening Task Force has been formed to help identify and evaluated potential MRS facility sites within a preferred region and with the application of a siting process and criteria developed by the DOE. The activities of the task force presented in this report includes: site screening (Sections 3, 4, and 5), the MRS facilities which are to be sited are described; the criteria, process and outcome of the screening process is presented; and descriptions of the candidate MRS facility sites are given, and site evaluations (Sections 6 through 9) where the rational for the site evaluations are presented, along with each evaluation and findings of the Task Force.

  10. Umatilla Hatchery Monitoring and Evaluation, 2003-2005 Annual Report.

    SciTech Connect

    Onjukka, Sam T.; O'Connor, Glenda M.; Gibbs, Derek

    2007-01-01

    Fish health work continued in this report period as described in the project statement of work. The statements of work for this time period list the work element (Maintain Fish Health - Monitor Fish Health) and description of deliverables.

  11. Idaho Steelhead Monitoring and Evaluation Studies : Annual Progress Report 2007.

    SciTech Connect

    Copeland, Timothy; Putnam, Scott

    2008-12-01

    The goal of Idaho Steelhead Monitoring and Evaluation Studies is to collect monitoring data to evaluate wild and natural steelhead populations in the Clearwater and Salmon river drainages. During 2007, intensive population data were collected in Fish Creek (Lochsa River tributary) and Rapid River (Little Salmon River tributary); extensive data were collected in other selected spawning tributaries. Weirs were operated in Fish Creek and Rapid River to estimate adult escapement and to collect samples for age determination and genetic analysis. Snorkel surveys were conducted in Fish Creek, Rapid River, and Boulder Creek (Little Salmon River tributary) to estimate parr density. Screw traps were operated in Fish Creek, Rapid River, Secesh River, and Big Creek to estimate juvenile emigrant abundance, to tag fish for survival estimation, and to collect samples for age determination and genetic analysis. The estimated wild adult steelhead escapement in Fish Creek was 81 fish and in Rapid River was 32 fish. We estimate that juvenile emigration was 24,127 fish from Fish Creek; 5,632 fish from Rapid River; and 43,674 fish from Big Creek. The Secesh trap was pulled for an extended period due to wildfires, so we did not estimate emigrant abundance for that location. In cooperation with Idaho Supplementation Studies, trap tenders PIT tagged 25,618 steelhead juveniles at 18 screw trap sites in the Clearwater and Salmon river drainages. To estimate age composition, 143 adult steelhead and 5,082 juvenile steelhead scale samples were collected. At the time of this report, 114 adult and 1,642 juvenile samples have been aged. Project personnel collected genetic samples from 122 adults and 839 juveniles. We sent 678 genetic samples to the IDFG Eagle Fish Genetics Laboratory for analysis. Water temperature was recorded at 37 locations in the Clearwater and Salmon river drainages.

  12. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1992 Annual Report.

    SciTech Connect

    Keefe, MaryLouise; Carmichael, Richard W.; French, Rod A.

    1993-03-01

    This report covers the first year of comprehensive monitoring and evaluation of the Umatilla Hatchery. As both the hatchery and the evaluation study are in the early stages of implementation, much of the information contained in this report is preliminary. The most crucial data for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available. A comprehensive fish health monitoring regimen was incorporated into the monitoring and evaluation study for Umatilla Hatchery. This is a unique feature of the Umatilla Hatchery evaluation project.

  13. Monitoring and evaluating ground-source heat pump. Final report

    SciTech Connect

    Stoltz, S.V.; Cade, D.; Mason, G.

    1996-05-01

    This report presents the measured performance of four advanced residential ground-source heat pump (GSHP) systems. The GSHP systems were developed by WaterFurnace International to minimize the need for electric resistance backup heating and featured multiple speed compressors, supplemental water heating, and at most sites, multiple-speed fans. Detailed data collected for a complete year starting in June 1994 shows that the advanced design is capable of maintaining comfort without the use of electric resistance backup heating. In comparison with a conventional air-source heat pump, the advanced-design GSHP reduced peak heating demand by more than 12 kilowatts (kW) per residence and provided energy savings. The report describes the cooling and heating season operation of the systems, including estimated seasonal efficiency, hours of operation, and load profiles for average days and peak days. The electrical energy input, cooling output, and efficiency are presented as a function of return air temperature and ground loop temperature.

  14. Yakima/Klickitat Fisheries Project; Klickitat Only Monitoring and Evaluation, 2002-2003 Annual Report.

    SciTech Connect

    Sampson, Melvin; Evenson, Rolf

    2003-12-01

    The monitoring and evaluation activities described in this report were determined by consensus of the scientists from the Yakama Nation (YN). Klickitat Subbasin Monitoring and Evaluation (M&E) activities have been subjected to scientific and technical review by members of YKFP's Science/Technical Advisory Committee (STAC) as part of the YKFP's overall M&E proposal. Yakama Nation YKFP project biologists have transformed the conceptual design into the tasks described. This report summarizes progress and results for the following major categories of YN-managed tasks under this contract: (1) Monitoring and Evaluation - Accurately characterize baseline available habitat and salmonid populations pre-habitat restoration and pre-supplementation. (2) EDT Modeling - Identify and evaluate habitat and artificial production enhancement options. (3) Genetics - Characterize the genetic profile of wild steelhead in the Klickitat Basin. (4) Ecological Interactions - Determine the presence of pathogens in wild and naturally produced salmonids in the Klickitat Basin and develop supplementation strategies using this information.

  15. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1993-1994 Annual Report.

    SciTech Connect

    Hayes, Michael C.; Onjukka, Sam T.; Focher, Shannon M.

    1995-01-01

    This report covers the first three years of comprehensive monitoring and evaluation of the Umatilla Hatchery. Because the hatchery and the evaluation study and the fish health monitoring investigations are in the early stages of implementation, much of the information contained in this report is preliminary. The majority of the data that is crucial for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available.

  16. Field evaluation of direct-reading continuous ethylene oxide monitors. Final report

    SciTech Connect

    Hossain, M.A.; Carpenter, D.R.

    1989-05-01

    The Wilford Hall USAF Medical Center Central Processing Section (WHMC/SGLP) uses ethylene oxide (EtO) as a primary sterilizing agent. Because of their concern about the health effects of EtO, SGLP has searched for a continuous-monitoring EtO system. In their search, they found two units (AMSCO's Envirogard III and Baseline Industries, Inc.'s Model 5500 Gas Analyzer). The objective of this evaluation was to conduct a field study to compare the performances of the two direct-reading continuous EtO monitors against the Occupational Safety and Health Administration's (OSHA) acceptable charcoal-tube sampling method. In addition, the 3M EtO passive monitor sampling method was compared with the charcoal-tube method and direct-reading instrumental method as well. Neither the Baseline Industries, Inc. nor the AMSCO continuous monitors corresponded to OSHA acceptable charcoal tube method of air sampling. Both instruments reported EtO concentrations much higher than those detected by the charcoal tubes. There is no way of knowing which method, the direct-reading continuous monitor or the charcoal tube/passive monitor, is more correct. However, the OSHA standard for EtO is based on measuring EtO by the charcoal tube method.

  17. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1994-1995 Annual Report.

    SciTech Connect

    Hayes, Michael C.; Waln, Karen; Carmichael, Richard W.

    1996-01-01

    The Northwest Power Planning Council`s Columbia River Basin Fish and Wildlife Program authorized construction of the Umatilla Hatchery in 1986. Measure 703 of the program amended the original authorization for the hatchery and specified evaluation of the Michigan type of rearing using oxygen supplementation to reach production goals of 290,000 lb of chinook salmon (Oncorhynchus tshawytscha) and steelhead (Oncorhynchus nzykiss). The hatchery was completed in the fall of 1991. Partial justification for the hatchery was to develop considerable knowledge and understanding of new production and supplementation techniques. The use of the Michigan raceways in rearing at Umatilla Hatchery was selected because it could increase smolt production given the limited hatchery well water supply and allow comparison of Michigan raceways with the standard Oregon raceways. Results of testing the Michigan raceways will have systematic application in the Columbia Basin. The Umatilla Hatchery is the foundation for rehabilitating chinook salmon and enhancing steelhead in the Umatilla River and is expected to contribute significantly to the Northwest Power Planning Council`s goal of doubling salmon production in the Columbia Basin. Hatchery production goals and a comprehensive monitoring and evaluation plan were presented in the Umatilla Hatchery Master Plan . The Comprehensive Plan for Monitoring and Evaluation of Umatilla Hatchery was approved by the Northwest Power Planning Council as a critical adaptive management guide for fisheries rehabilitation in the Umatilla River. Monitoring and evaluation will be used to increase knowledge about uncertainties inherent in the fisheries rehabilitation and will complement the developing systematic monitoring and evaluation program. This report covers the first four years of the monitoring of the hatchery.

  18. Monitoring and Evaluation; Statistical Support for Life-cycle Studies, Annual Report 2006.

    SciTech Connect

    Skalski, John

    2007-02-01

    This report summarizes the statistical analysis and consulting activities performed under Contract No. 00025093, Project No. 199105100, funded by Bonneville Power Administration (BPA) during 2006. These efforts are focused on providing real-time predictions of outmigration timing, assessment of life-history performance measures, evaluation of status and trends in recovery, and guidance on the design and analysis of Columbia Basin fish and wildlife studies monitoring and evaluation studies. The overall objective of the project is to provide BPA and the rest of the fisheries community with statistical guidance on design, analysis, and interpretation of monitoring data, which will lead to improved monitoring and evaluation of salmonid mitigation programs in the Columbia/Snake River Basin. This overall goal is being accomplished by making fisheries data readily available for public scrutiny, providing statistical guidance on the design and analyses of studies by hands-on support and written documents, and providing real-time analyses of tagging results during the smolt outmigration for review by decision makers. For over a decade, this project has been providing in-season projections of smolt outmigration timing to assist in spill management. As many as 52 different fish stocks at 10 different hydroprojects are tracked in real-time to predict the 'percent of run to date' and 'date to specific percentile'. The project also conducts added-value analyses of historical tagging data to understand relationships between fish responses, environmental factors, and anthropogenic effects. The statistical analysis of historical tagging data crosses agency lines in order to assimilate information on salmon population dynamics irrespective of origin. The lessons learned from past studies are used to improve the design and analyses of future monitoring and evaluation efforts. Through these efforts, the project attempts to provide the fisheries community with reliable analyses and

  19. Monitoring and Evaluation; Statistical Support for Life-cycle Studies, 2003 Annual Report.

    SciTech Connect

    Skalski, John

    2003-12-01

    This report summarizes the statistical analysis and consulting activities performed under Contract No. 00004134, Project No. 199105100 funded by Bonneville Power Administration during 2003. These efforts are focused on providing real-time predictions of outmigration timing, assessment of life-history performance measures, evaluation of status and trends in recovery, and guidance on the design and analysis of Columbia Basin fish and wildlife studies monitoring and evaluation studies. The overall objective of the project is to provide BPA and the rest of the fisheries community with statistical guidance on design, analysis, and interpretation of monitoring data, which will lead to improved monitoring and evaluation of salmonid mitigation programs in the Columbia/Snake River Basin. This overall goal is being accomplished by making fisheries data readily available for public scrutiny, providing statistical guidance on the design and analyses of studies by hands-on support and written documents, and providing real-time analyses of tagging results during the smolt outmigration for review by decision makers. For a decade, this project has been providing in-season projections of smolt outmigration timing to assist in spill management. As many as 50 different fish stocks at 8 different hydroprojects are tracked and real-time to predict the 'percent of run to date' and 'date to specific percentile'. The project also conducts added-value analyses of historical tagging data to understand relationships between fish responses, environmental factors, and anthropogenic effects. The statistical analysis of historical tagging data crosses agency lines in order to assimilate information on salmon population dynamics irrespective of origin. The lessons learned from past studies are used to improve the design and analyses of future monitoring and evaluation efforts. Through these efforts, the project attempts to provide the fisheries community with reliable analyses and interpretations

  20. Umatilla Basin Natural Production Monitoring and Evaluation; 1998-2002 Summary Report.

    SciTech Connect

    Contor, Craig R.

    2004-07-01

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPME). Chapter One provides an overview of the entire report and shows how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. This chapter also provides background information relevant to the aquatic resources of the Umatilla River Basin. (Figure 1-1, Tables 1-1 and 1-2). Data and reports from this and previous efforts are available on the CTUIR website http://www.umatilla.nsn.us. This project was one of several subprojects of the Umatilla River Basin Fisheries Restoration Master Plan (CTUIR 1984, ODFW 1986) orchestrated to rehabilitate salmon and steelhead runs in the Umatilla River Basin. Subprojects in additions to this project include: Watershed Enhancement and Rehabilitation; Hatchery Construction and Operation; Hatchery Monitoring and Evaluation; Satellite Facility Construction and Operations for Juvenile Acclimation and Adult Holding and Spawning; Fish Passage Construction and Operation; Juvenile and Adult Passage Facility Evaluations; Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Basin, and Flow Augmentation to Increase Stream Flows below Irrigation Diversions.

  1. Protect Anadromous Salmonids in the Mainstem Corridor, Monitoring and Evaluation, Annual Report 200-2001.

    SciTech Connect

    Vigg, Steven; Johnson, John

    2002-02-01

    In this annual Monitoring & Evaluation (M&E) report to the Bonneville Power Administration (BPA), we summarize significant activities and performance measures resultant from enhanced protection by Columbia River Inter-Tribal Fisheries Enforcement (CRITFE) in the mainstem corridor (BPA Project 2000-056). This report covers the Fiscal Year (FY) 2000 performance period -- May 15, 2000 to May 14, 2001. Quarterly progress reports have previously been submitted to BPA and are posted on the M&E Web site (www.Eco-Law.net) -- for the time period April-December 2000 (Vigg 2000b,c,d) and for the period January-June 2001 (Vigg 2001a,b). We also present comprehensive data representing the first quarter of year 2000 in this report for a pre-project comparison. In addition, we have analyzed specific annual enforcement statistics to evaluate trends during the baseline period 1996-2000. Additional statistics and more years of comprehensive baseline data are now being summarized, and will be presented in future M&E annual reports--to provide a longer time series for evaluation of trends in input, output and outcome performance standards.

  2. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    SciTech Connect

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  3. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    SciTech Connect

    Contor, Craig R.; Harris, Robin; King, Marty

    2009-06-10

    salmon (O. kisutch), and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (Bureau of Reclamation, BOR 1988). The most notable development was the construction and operation of Three Mile Falls Dam (TMD) and other irrigation projects which dewatered the Umatilla River during salmon migrations. CTUIR and ODFW developed the Umatilla Hatchery Master Plan to restore fisheries to the basin. The plan was completed in 1990 and included the following objectives which were updated in 1999: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Increase annual returns to Three Mile Falls Dam to 31,500 adult salmon and steelhead. In the past the M&E project conducted long-term monitoring activities as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations, habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), and genetic monitoring (Currens & Schreck 1995, Narum et al. 2004). The project's goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. The status of completion of each of BPA's standardized work element was reported in 'Pisces'(March 2008) and is summarized.

  4. Yakima/Klickitat Fisheries Project - Klickitat Monitoring and Evaluation, 2007 Annual Report.

    SciTech Connect

    Zendt, Joe; Babcock, Mike

    2006-04-02

    This report describes the results of monitoring and evaluation (M&E) activities for salmonid fish populations and habitat in the Klickitat River subbasin in south-central Washington. The M&E activities described here were conducted as a part of the Bonneville Power Administration (BPA)-funded Yakima/Klickitat Fisheries Project (YKFP) and were designed by consensus of the scientists with the Yakama Nation (YN) Fisheries Program. YKFP is a joint project between YN and Washington Department of Fish and Wildlife (WDFW). Overall YKFP goals are to increase natural production of and opportunity to harvest salmon and steelhead in the Yakima and Klickitat subbasins using hatchery supplementation, harvest augmentation and habitat improvements. Klickitat subbasin M&E activities have been subjected to scientific and technical review by members of the YKFP Science/Technical Advisory Committee (STAC) as part of the YKFP's overall M&E proposal. Yakama Nation YKFP biologists have transformed the conceptual design into the tasks described. YKFP biologists have also been involved with the Collaborative Systemwide Monitoring and Evaluation Project (CSMEP - a project aimed at improving the quality, consistency, and focus of fish population and habitat data to answer key M&E questions relevant to major decisions in the Columbia Basin) and are working towards keeping Klickitat M&E activities consistent with CSMEP recommendations. This report summarizes progress and results for the following major categories of YN-managed tasks under this contract: (1) Monitoring and Evaluation - to gather baseline information in order to characterize habitat and salmonid populations pre- and post-habitat restoration and pre-supplementation. (2) Ecological Interactions - to determine presence of pathogens in wild and naturally produced salmonids in the Klickitat Basin and develop supplementation strategies using this information. (3) Genetics - to develop YKFP supplementation broodstock collection

  5. TECHNOLOGY EVALUATION REPORT CEREX ENVIRONMENTAL SERVICES UV HOUND POINT SAMPLE AIR MONITOR

    EPA Science Inventory

    The USEPA's National Homeland Security Research Center (NHSRC) Technology Testing and Evaluation Program (TTEP) is carrying out performance tests on homeland security technologies. Under TTEP, Battelle evaluated the performance of the Cerex UV Hound point sample air monitor in de...

  6. Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

    SciTech Connect

    Marmorek, David R.; Porter, Marc; Pickard, Darcy; Wieckowski, Katherine

    2008-11-19

    data assessments and others assembled over the years of the CSMEP project can be accessed on the CBFWA public website. The CSMEP web database (http://csmep.streamnet.org/) houses metadata inventories from S&W assessments of Columbia River Basin watersheds that were completed prior to FY2008. These older S&W assessments are maintained by StreamNet, but budget cutbacks prevented us from adding the new FY2008 assessments into the database. Progress was made in FY2008 on CSMEP's goals of collaborative design of improved M&E methods. CSMEP convened two monitoring design workshops in Portland (December 5 and 6, 2007 and February 11 and 12, 2008) to continue exploration of how best to integrate the most robust features of existing M&E programs with new approaches. CSMEP continued to build on this information to develop improved designs and analytical tools for monitoring the status and trends of fish populations and the effectiveness of hatchery and hydrosystem recovery actions within the Columbia River Basin. CSMEP did not do any new work on habitat or harvest effectiveness monitoring designs in FY2008 due to budget cutbacks. CSMEP presented the results of the Snake Basin Pilot Study to the Independent Scientific Review Panel (ISRP) in Portland on December 7, 2008. This study is the finalization of CSMEP's pilot exercise of developing design alternatives across different M&E domains within the Snake River Basin spring/summer Chinook ESU. This work has been summarized in two linked reports (CSMEP 2007a and CSMEP 2007b). CSMEP participants presented many of the analyses developed for the Snake Basin Pilot work at the Western Division American Fisheries Society (AFS) conference in Portland on May 4 to 7, 2008. For the AFS conference CSMEP organized a symposium on regional monitoring and evaluation approaches. A presentation on CSMEP's Cost Integration Database Tool and Salmon Viability Monitoring Simulation Model developed for the Snake Basin Pilot Study was also given to the

  7. The Walla Walla Basin Natural Production Monitoring and Evaluation Project : Progress Report, 1999-2002.

    SciTech Connect

    Contor, Craig R.; Sexton, Amy D.

    2003-06-02

    The Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME). Chapter One provides an overview of the entire report and how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. Chapter One also provides background information relevant to the aquatic resources of the Walla Walla River Basin. Objectives are outlined below for the statements of work for the 1999, 2000, 2001 and 2002 contract years. The same objectives were sometimes given different numbers in different years. Because this document is a synthesis of four years of reporting, we gave objectives letter designations and listed the objective number associated with the statement of work for each year. Some objectives were in all four work statements, while other objectives were in only one or two work statements. Each objective is discussed in a chapter. The chapter that reports activities and findings of each objective are listed with the objective below. Because data is often interrelated, aspects of some findings may be reported or discussed in more than one chapter. Specifics related to tasks, approaches, methods, results and discussion are addressed in the individual chapters.

  8. Effects of Establishing a Conceptualization Context for Learning Monitoring and Evaluating Tasks. Final Report.

    ERIC Educational Resources Information Center

    McCutcheon, Richard E., Jr.; Brock, John F.

    The research evaluates the effectiveness of a 'Concepts of CIC' program in improving performance on classroom monitoring exercises. The function of the combat information center watch officer (CICWO) course is primarily to train CICWOs in monitoring and evaluating. Two versions of 'Concepts of CIC' were administered to two groups of students in…

  9. Monitoring and Evaluation Plan for the Nez Perce Tribal Hatchery, 1996 Technical Report.

    SciTech Connect

    Steward, Cleveland R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and released under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan (Larson and Mobrand 1992), the 1995 Supplement to the Master Plan (Johnson et al. 1995), and the Nez Perce Tribal Hatchery Program Environmental Impact Statement (Bonneville Power Administration et al. 1996). The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine. whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts. Program success will be gauged primarily by changes in the abundance and distribution of supplemented chinook populations. The evaluation of project-related impacts will focus on the biological effects of constructing and operating NPTH hatchery facilities, introducing hatchery fish into the natural environment, and removing or displacing wild

  10. Facilitation of the Estuary/Ocean Subgroup for Research, Monitoring, and Evaluation, FY06 Annual Report

    SciTech Connect

    Johnson, Gary E.

    2006-10-03

    This annual report is a deliverable for fiscal year 2006 (FY06) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to the 2000 and 2004 Biological Opinions on operation of the Federal Columbia River Power System. The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates implementation of the Estuary RME Plan. In FY06, EOS project accomplishments included: 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version May 2006) based on comments by EOS members, the Independent Scientific Review Panel, and other reviewers. In the context of uncertainty about the direction of the federal RME due to litigation on the FCRPS Biological Opinion, FY06 activities for the EOS project resulted in expanded substantive coordination with other regional RME forums, project tracking infrastructure, and a new version of the Estuary RME Plan.

  11. Facilitation of the Estuary/Ocean Subgroup for Research, Monitoring and Evaluation - FY07 Annual Report.

    SciTech Connect

    Johnson, Gary E.; Diefenderfer, Heida L.

    2007-10-10

    This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort of the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In FY07, EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via the project tracking system, PISCES; (4) quarterly project status reports; and (5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.

  12. Facilitation of the Estuary/Ocean Subgroup for Research, Monitoring, and Evaluation, FY07 Annual Report

    SciTech Connect

    Johnson, Gary E.; Diefenderfer, Heida L.

    2007-10-10

    This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In FY07, EOS project accomplishments included 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.

  13. Development and Evaluation of Video Systems for Performance Testing and Student Monitoring. Final Report.

    ERIC Educational Resources Information Center

    Hayes, John; Pulliam, Robert

    A video performance monitoring system was developed by the URS/Matrix Company, under contract to the USAF Human Resources Laboratory and was evaluated experimentally in three technical training settings. Using input from 1 to 8 video cameras, the system provided a flexible combination of signal processing, direct monitor, recording and replay…

  14. Umatilla Basin Natural Production Monitoring and Evaluation; 1992-1993 Annual Report.

    SciTech Connect

    Confederated Tribes of the Umatilla Indian Reservation,

    1994-09-01

    This report summarizes the activities of the Umatilla Basin Natural Production Monitoring and Evaluation Project from September 30, 1992 to September 29, 1993. Examinations of historical flow and water temperature records and current physical habitat, indicate that the streams in the Umatilla River Basin vary in condition from extremely poor to good. Reduced flows and high water temperatures prevented salmonid production in the lower Umatilla River below river mile 75 during the summer and early fall. This was also true in the lower reaches of many tributaries. Isolated springs provided limited refuges in the mid Umatilla River and lower Meacham Creek. Suitable habitat for salmonids was found in the upper reaches of the mainstem and tributaries.

  15. Gasbuggy, New Mexico Long-Term Hydrologic Monitoring Program Evaluation Report

    SciTech Connect

    2009-06-01

    This report summarizes an evaluation of the Long-Term Hydrologic Monitoring Program (LTHMP) that has been conducted since 1972 at the Gasbuggy, New Mexico underground nuclear detonation site. The nuclear testing was conducted by the U.S. Atomic Energy Commission under the Plowshare program, which is discussed in greater detail in Appendix A. The detonation at Gasbuggy took place in 1967, 4,240 feet below ground surface, and was designed to fracture the host rock of a low-permeability natural gas-bearing formation in an effort to improve gas production. The site has historically been managed under the Nevada Offsites Project. These underground nuclear detonation sites are within the United States but outside of the Nevada Test Site where most of the experimental nuclear detonations conducted by the U.S. Government took place. Gasbuggy is managed by the U.S. Department of Energy (DOE) Office of Legacy Management (LM ).

  16. Evaluation and monitoring of transportation control measures. Final research report, September 1991-September 1995

    SciTech Connect

    Knapp, K.K.; Rao, K.S.; Crawford, J.A.; Krammes, R.A.

    1995-09-01

    The mandates of the Clean Air Act Amendments (CAAAs) and Intermodal Surface Transportation Efficiency Act (ISTEA) Congestion Mitigation and Air Quality (CMAQ) Improvement Program require the evaluation and monitoring of transportation control measure (TCM) emission impacts. The objective of the research documented herein was to investigate issues related to the evaluation and monitoring of TCM impacts. Researchers reviewed the advantages and limitations of TCM evaluation methods currently available, and identified two critical issues which influence their capabilities and accuracy. The TCM evaluation methods reviewed include the use of comparative empirical data, network-based models, and sketch-planning tools. The structure of TCM monitoring programs was also studied. Monitoring programs are presented for four TCMs: transit plazas, intersection improvements, ridesharing, and park-and-ride lots.

  17. 77 FR 69541 - Technical Report Evaluating the Effectiveness of Tire Pressure Monitoring Systems (TPMS) in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-19

    ... April 11, 2000 (65 FR 19477) or you may visit http://www.regulations.gov . Please send two paper copies... Pressure Monitoring Systems (TPMS) in Proper Tire Pressure Maintenance AGENCY: National Highway Traffic... its existing Safety Standard 138, Tire Pressure Monitoring Systems. The report's title is:...

  18. Umatilla Basin Natural Production Monitoring and Evaluation; 1993-1994 Annual Report.

    SciTech Connect

    Contor, Craig R.; Hoverson, Eric; Kissner, Paul D.

    1995-04-01

    This report summarizes the activities of the Umatilla Basin Natural Production Monitoring and Evaluation Project from September 30, 1993 to September 29, 1994. A total of 39.4 miles of stream habitat was inventoried on the Umatilla River, Squaw Creek, Camp Creek, and an un-named tributary of Camp Creek. The overall habitat quality of the Umatilla River and Squaw Creek was classified as poor. The overall habitat quality of Camp Creek and the un-named tributary was fair. A total of 565 of 4,928 habitat units were sampled for fish using backpack electrofishers. The total population estimate of salmon and trout in all streams sampled was 74,972, and density was 0.0799/M{sup 2}. Forty permanent index sites were established to monitor relative species abundance. Each site was electrofished in the spring, summer, and fall. A total of 44 additional presence/absence surveys were conducted during one or more of the three time periods.

  19. The monitoring evaluation, reporting and verification of climate change mitigation projects

    SciTech Connect

    Vine, E.; Sathaye, J.

    1998-05-01

    Because of concerns with the growing threat of global climate change from increasing emissions of greenhouse gases, the US and other countries are implementing, by themselves or in cooperation with one or more other nations, climate change mitigation projects. These projects will reduce greenhouse gas (GHG) emissions or sequester carbon, and will also result in non-GHG benefits (i.e., environmental, economic, and social benefits). Monitoring, evaluating, reporting, and verifying (MERV) guidelines are needed for these projects to accurately determine their net GHG, and other, benefits. Implementation of MERV guidelines is also intended to: (1) increase the reliability of data for estimating GHG benefits; (2) provide real-time data so that mid-course corrections can be made; (3) introduce consistency and transparency across project types and reporters; and (4) enhance the credibility of the projects with stakeholders. In this paper, the authors review the issues involved in MERV activities. They identify several topics that future protocols and guidelines need to address, such as: (1) establishing a credible baseline; (2) accounting for impacts outside project boundaries through leakage; (3) net GHG reductions and other benefits; (4) precision of measurement; (5) MERV frequency; (6) persistence (sustainability) of savings, emissions reduction, and carbon sequestration; (7) reporting by multiple project participants; (8) verification of GHG reduction credits; (9) uncertainty and risk; (10) institutional capacity in conducting MERV; and (11) the cost of MERV.

  20. Monitor and Evaluate the Genetic Characteristics of Supplemented Salmon and Steelhead, 2006-2007 Progress Report.

    SciTech Connect

    Berntson, Ewann; Waples, Robin S.; Moran, Paul

    2008-11-20

    This progress report offers a summary of genetic monitoring and evaluation research related to artificial propagation of Chinook salmon and steelhead in the Snake River basin. Our principal goal has been to characterize the relative (and net) reproductive success of hatchery fish spawning in the wild in multiple sub-basins. We address a critical uncertainty identified in essentially all tribal, state, and federal recovery planning efforts. Beyond simple description of those patterns of differential reproductive success, we seek to understand the biotic and abiotic factors that contribute to our observations, including genetic and environmental elements, and the real time effects of hatchery reform. We adopt two fundamentally different approaches that capture processes operating at different geographic scales. Our tier 2 design monitors changes in gene frequency through time in hatchery and wild populations. These studies monitor spatial and temporal genetic change over broad river basins and sub-basins. Tier 3 studies, by contrast, are able to construct pedigrees in naturally spawning populations that include hatchery and wild fish. We can then use actual matings to infer the fitness of hatchery versus wild individuals, based on the numbers of offspring we observe in our progeny samples. We get extraordinary detail from the tier 3 studies but only for a single river system. Thus, tier 2 studies provide breadth of information, whereas tier 3 studies offer unparalleled depth of insight for single discrete systems. We exceeded our goals in almost all areas for both tier 2 and tier 3 studies, and, where we did not, we offer an explanation of why, and what future action will be taken (Lessons Learned). All subcontracts were let as expected, providing smolt trapping, tissue sampling, genotyping, and analysis. Our inter-laboratory standardization efforts with tribal, state, and federal agencies were highly successful in this period. These standardization activities have

  1. Test and evaluation report of the Catalyst Research Oxygen Monitor, Model Miniox 3

    NASA Astrophysics Data System (ADS)

    Bruckart, James E.; Quattlebaum, Martin; Licina, Joseph R.; Olding, Bill

    1992-07-01

    The Catalyst Research Oxygen Monitor, Model Miniox 3, was tested for electromagnetic interference/compatibility in the UH-60A helicopter under the U.S. Army Program for Testing and Evaluation of Equipment for Aeromedical Operations. The tests were conducted using current military and industrial standards and procedures for electromagnetic interference/compatibility and human factors. The Catalyst Research Oxygen Monitor, Model Miniox III, was found to be compatible with U.S. Army MEDEVAC UH-60 Black Hawk.

  2. Monitoring and Evaluation : Yakima/Klickitat Fisheries Project, Annual Report 2001.

    SciTech Connect

    Sampson, Melvin R.

    2002-12-01

    The monitoring and evaluation objectives and tasks have been developed through a joint process between the co-managers, Yakama Nation (YN, Lead Agency) and Washington Department of Fish and Wildlife (WDFW). The Science/Technical Advisory Committee (STAC), which consists of core members from the co-managers, employs the services of a work committee of scientists, the Monitoring Implementation Planning Team (MIPT) to develop the Monitoring and Evaluation (M&E) Plan. The process employed by STAC to verify these designated activities and the timing of their implementation involved the utilization of the following principles: (1) YKFP monitoring should evaluate the success (or lack of it) of project supplementation efforts and its impacts, including juvenile post release survival, natural production and reproductive success, ecological interactions, and genetics; (2) YKFP monitoring should be comprehensive: and, (3) YKFP monitoring should be done in such a way that results are of use to salmon production efforts throughout and Columbia basin and the region. Utilizing these principles, STAC and MIPT developed this M&E action plan in three phases. The first phase was primarily conceptual. STAC and MIPT defined critical issues and problems and identified associated response variables. The second phase was quantitative, which determined the scale and size of an effective monitoring effort. A critical element of the quantitative phase was an assessment of the precision with which response variables can be measured, the probability of detecting real impacts and the sample sizes required for a given level of statistical precision and power. The third phase is logistical. The feasibility of monitoring measures was evaluated as to practicality and cost. The Policy Group has determined that the M&E activities covered by this agreement are necessary, effective and cost-efficient.

  3. Monitoring and Evaluation : Yakima/Klickitat Fisheries Project, Final Report 2000.

    SciTech Connect

    Sampson, Melvin R.

    2000-01-01

    The monitoring and evaluation objectives and tasks have been developed through a joint process between the co-managers, Yakama Nation (YN, Lead Agency) and Washington Department of Fish and Wildlife (WDFW). The Science/Technical Advisory Committee (STAC), which consists of core members from the co-managers, employs the services of a work committee of scientists, the Monitoring Implementation Planning Team (MIPT) to develop the Monitoring and Evaluation (M&E) Plan. The process employed by STAC to verify these designated activities and the timing of their implementation involved the utilization of the following principles: (1) YKFP monitoring should evaluate the success (or lack of it) of project supplementation efforts and its impacts, including juvenile post release survival, natural production and reproductive success, ecological interactions, and genetics; (2) YKFP monitoring should be comprehensive: and, (3) YKFP monitoring should be done in such a way that results are of use to salmon production efforts throughout and Columbia basin and the region. Utilizing these principles, STAC and MIPT developed this M&E action plan in three phases. The first phase was primarily conceptual. STAC and MIPT defined critical issues and problems and identified associated response variables. The second phase was quantitative, which determined the scale and size of an effective monitoring effort. A critical element of the quantitative phase was an assessment of the precision with which response variables can be measured, the probability of detecting real impacts and the sample sizes required for a given level of statistical precision and power. The third phase is logistical. The feasibility of monitoring measures was evaluated as to practicality and cost. The Policy Group has determined that the M&E activities covered by this agreement are necessary, effective and cost-efficient.

  4. Evaluation and Monitoring of Wild /Natural Steelhead Trout Production, 1996 Annual Report.

    SciTech Connect

    Leth, Brian D.; Holubetz, Terry B.; Nemeth, Doug

    2000-01-01

    This project was initiated to provide additional, and more definitive, information regarding wild steelhead Oncorhynchus mykiss populations in Idaho. Important streams for wild steelhead production were identified and selected for monitoring. Monitoring activities employed among streams varied, but generally included: aerial redd counts, placement of adult weirs, enumeration of juveniles through mask and snorkel counts, and emigrant trapping. This report details activities during the 1996 field season.

  5. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    SciTech Connect

    Busack, Craig A.; Fritts, Anthony L.; Kassler, Todd

    2006-05-01

    This report covers one of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME). The YKFPME is funded under two BPA contracts, one for the Yakama Nation and the other for the Washington Department of Fish and Wildlife (Contract number 22370, Project Number 1995-063-25). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME. The current report was completed by the Washington Department of Fish and Wildlife.

  6. Floor Probe/Contamination Monitor (NE Model FLP3D) Test and Evaluation Report

    SciTech Connect

    Shourbaji, A.A.

    2003-06-27

    A floor contamination monitor model FLP3D manufactured by Saint-Gobain Crystals and Detectors UK Ltd. was tested at Oak Ridge National Laboratory. The purpose of the test is to evaluate the monitor's performance as a mobile instrument capable of detecting alpha and/or beta contamination that may exist on a flat surface such as a floor. The monitor consists of a large area scintillation probe (600 cm{sup 2}) and a rate meter mounted on heavy-duty wheels with a 22 mm separation between the monitored surface and the probe. Performance was evaluated under normal and severe environmental conditions in terms of temperature and humidity variations, and exposure to RF and magnetic fields. Sensitivity measurements were also made to determine the probe's efficiency for detecting alpha and beta contamination. The overall performance of the floor monitor is considered satisfactory under the various environmental conditions with no major problems observed. The monitor is approximately 50% efficiency for {sup 90}Sr/{sup 90}Y with the source placed in contact with the detector's protective grille (0 mm) and at a distance of 22 mm. However, in its present physical configuration, the floor monitor is inefficient in detecting alpha contamination due to the 22 mm separation between the surface to be monitored and the detector's surface. The alpha detection efficiency can be enhanced to a reasonable vale by redesigning the brackets holding the heavy-duty wheels to reduce the height between the surface to be monitored and the surface of the probe to a few millimeters. For use at ORNL, this change is recommended.

  7. Final Evaluation and Monitoring Report of Demonstration Project for Adult Education "Mobilizing Adult Basic Education".

    ERIC Educational Resources Information Center

    Harris, Dolores M.

    A demonstration adult education project aimed at a rural New Jersey population and involving class sessions 1 evening per week at 6 sites (N=85 students, including 65 caucasians, 10 blacks, and 10 Hispanic) was evaluated in terms of compliance, process, and performance. Compliance monitoring included examination of: visitations; budget; staff…

  8. Idaho Natural Production Monitoring and Evaluation : Annual Progress Report February 1, 2007 - January 31, 2008.

    SciTech Connect

    Copeland, Timothy; Johnson, June; Putnam, Scott

    2008-12-01

    River stocks of steelhead and spring/summer Chinook salmon still have significant natural reproduction and thus are the focal species for this project's investigations. The overall goal is to monitor the abundance, productivity, distribution, and stock-specific life history characteristics of naturally produced steelhead trout and Chinook salmon in Idaho (IDFG 2007). We have grouped project tasks into three objectives, as defined in our latest project proposal and most recent statement of work. The purpose of each objective involves enumerating or describing individuals within the various life stages of Snake River anadromous salmonids. By understanding the transitions between life stages and associated controlling factors, we hope to achieve a mechanistic understanding of stock-specific population dynamics. This understanding will improve mitigation and recovery efforts. Objective 1. Measure 2007 adult escapement and describe the age structure of the spawning run of naturally produced spring/summer Chinook salmon passing Lower Granite Dam. Objective 2. Monitor the juvenile production of Chinook salmon and steelhead trout for the major population groups (MPGs) within the Clearwater and Salmon subbasins. Objective 3. Evaluate life cycle survival and the freshwater productivity/production of Snake River spring/summer Chinook salmon. There are two components: update/refine a stock-recruit model and estimate aggregate smolt-to-adult survival. In this annual progress report, we present technical results for work done during 2007. Part 2 contains detailed results of INPMEP aging research and estimation of smolt-to-adult return rates for wild and naturally produced Chinook salmon (Objectives 1 and 3). Part 3 is a report on the ongoing development of a stock-recruit model for the freshwater phase of spring/summer Chinook salmon in the Snake River basin (Objective 3). Part 4 is a summary of the parr density data (Objective 2) collected in 2007 using the new site selection

  9. 45 CFR 303.109 - Procedures for State monitoring, evaluation and reporting on programs funded by Grants to States...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Procedures for State monitoring, evaluation and reporting on programs funded by Grants to States for Access and Visitation Programs. 303.109 Section 303.109 Public Welfare Regulations Relating to Public Welfare OFFICE OF CHILD SUPPORT ENFORCEMENT (CHILD SUPPORT ENFORCEMENT PROGRAM),...

  10. Umatilla Basin Natural Production Monitoring and Evaluation; 1995-1996 Annual Report.

    SciTech Connect

    Contor, Craig R.; Kissner, Paul; Volkman, Jed

    1997-08-01

    This report summarizes the activities of the Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPME) from September 30, 1995 to September 29, 1996. This program was funded by Bonneville Power Administration and was managed under the Fisheries Program, Department of Natural Resources, Confederated Tribes of the Umatilla Indian Reservation. The goal was to evaluate the implementation of the Umatilla River Basin fisheries restoration plan with respect to natural production, adult passage, and tribal harvest. An estimated 56.1 river miles (RM) of habitat was inventoried on the lower Umatilla River (RM 0--56.1) from June 4, to August 1, 1996. The majority of the lower River was found to be too polluted and physically altered to provide suitable rearing or migration habitat for salmonids during the summer. High water temperatures, irrigation withdrawals, altered channels, and urban and agricultural pollution all contributed to degrade the lower Umatilla River. Small springs provided cooler waters and created small areas that were suitable for salmonid rearing. The river below the mouth of Mckay Creek (RM 27.2 to 50.6) was also cooler and more suitable to salmonid rearing when water was released from Mckay Dam. Two hundred sixty-three of 1,832 (14.4%) habitat units were electrofished from June 19 to August 29, 1996. The number of natural juvenile salmonids captured between RM 1.5--52.4 follow: (1) 141 juvenile steelhead (including resident rainbow trout; Oncoryhnchus mykiss), (2) 13 mountain whitefish (Prosopium williamsoni, including adults), (3) four chinook salmon (O. tshawytscha), and (4) two coho salmon (O. kisutch). The expanded population estimate for the areas surveyed was 2,445 salmonids. Mean density was 0.147 salmonids/100 square meter. Mean density of fast water habitat types was 4.5 times higher than slow water types (0.358 and 0.079 s/100 m{sup 2}).

  11. Umatilla Basin Natural Production Monitoring and Evaluation; 2003-2004 Annual Report.

    SciTech Connect

    Schwartz, Jesse D.M.; Contor, Craig C.; Hoverson, Eric

    2005-10-01

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). UBNPMEP is coordinated with two ODFW research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. Our project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 19000500, Umatilla Hatchery M & E) and smolt outmigration (project No. 198902401, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects comprehensively monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. Table 1 outlines relationships with other BPA supported projects. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan (ODFW and CTUIR 2004), the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (Schwartz & Cameron Under Revision). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPPC 2004). The need for monitoring the natural production of salmonids in the Umatilla River Basin

  12. Natural Production Monitoring and Evaluation; Idaho Department of Fish and Game, 2000-2001 Annual Report.

    SciTech Connect

    Kiefer, Russell B.; Anderson, Dave; Johnson, June

    2001-10-01

    This report covers efforts to monitor age composition of wild adult spring/summer chinook salmon returning to the Snake River Basin. Accurately determining the ocean age proportions of wild adult spring/summer chinook salmon is important information for monitoring the status and trends of these species. During this report period, project personnel selected the preferred structure for aging, set up a database to track all samples collected, developed procedures and ordered equipment for structure preparation and reading, and aged the adults that were sampled in 1999. Chinook salmon carcasses were sampled from representative spawning areas throughout the Snake River Basin. Ocean age proportions were determined for each 5 centimeter fork length group for wild adult spring/summer chinook salmon returning to the Snake River. These ocean age proportions were applied to the number and estimated length frequency distribution of wild chinook salmon adults passing Lower Granite Dam to estimate the number of adult returns for each ocean age group.

  13. Natural Production Monitoring and Evaluation; Idaho Department of Fish and Game, 2003-2004 Annual Report.

    SciTech Connect

    Copeland, Timothy; Johnson, June; Bunn, Paul

    2004-12-01

    This report covers the following 3 parts of the Project: Part 1--Monitoring age composition of wild adult spring and summer Chinook salmon returning to the Snake River basin in 2003 to predict smolt-to-adult return rates Part 2--Development of a stock-recruitment relationship for Snake River spring/summer Chinook salmon to forecast natural smolt production Part 3--Improve the precision of smolt-to-adult survival rate estimates for wild steelhead trout by PIT tagging additional juveniles.

  14. Natural Production Monitoring and Evaluation; Idaho Department of Fish and Game, 2002-2003 Annual Report.

    SciTech Connect

    Kiefer, Russell B.; Johnson, June; Bunn, Paul

    2006-06-01

    This report covers the following 3 parts of the project: Part 1--Improve wild steelhead trout smolt-to-adult survival rate information by PIT tagging additional wild steelhead trout juveniles. Part 2--Estimating the stock-recruitment relationship for Snake River spring/summer chinook salmon and forecasting wild/natural smolt production. Part 3--Monitoring age composition of wild adult spring and summer chinook salmon returning to the Snake River basin.

  15. Natural Production Monitoring and Evaluation; Idaho Department of Fish and Game, 2001-2002 Annual Report.

    SciTech Connect

    Kiefer, Russell B.; Bunn, Paul; Johnson, June

    2002-06-01

    This report covers the following 3 chapters: Part 1--Improve wild steelhead trout smolt-to-adult survival rate information by PIT tagging additional wild steelhead trout juveniles. Part 2--Estimating the stock-recruitment relationship for Snake River spring/summer chinook salmon and forecasting wild/natural smolt production. Part 3--Monitoring age composition of wild adult spring and summer chinook salmon returning to the Snake River basin.

  16. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2001 Annual Report.

    SciTech Connect

    Boe, Stephen J.; Ogburn, Parker N.

    2003-03-01

    This is the second annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2001: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring chinook Supplementation Program (GRESCP). (2) Plan detailed GRESCP Monitoring and Evaluation for future years. (3) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (4) Plan for data collection needs for bull trout. (5) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (6) Collect summer steelhead. (7) Monitor adult endemic spring chinook salmon populations and collect broodstock. (8) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (9) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations. (10) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (11) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program. (12) Monitor water quality at facilities. (13) Document accomplishments and needs to permitters, comanagers, and funding agencies. (14) Communicate Project results to the scientific community.

  17. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2000 Annual Report.

    SciTech Connect

    Boe, Stephen J.; Lofy, Peter T.

    2003-03-01

    This is the third annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2000: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCP). (2) Plan for recovery of endemic summer steelhead populations in Catherine Creek and the upper Grande Ronde River. (3) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (4) Collect summer steelhead. (5) Collect adult endemic spring chinook salmon broodstock. (6) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (7) Document accomplishments and needs to permitters, comanagers, and funding agency. (8) Communicate project results to the scientific community. (9) Plan detailed GRESCP Monitoring and Evaluation for future years. (10) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations and incidentally-caught summer steelhead and bull trout. (11) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (12) Monitor water quality at facilities. (13) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program.

  18. Geothermal monitor report

    NASA Astrophysics Data System (ADS)

    1982-06-01

    Geothermal Progress Monitor Report No. 6 presents a state-by-state summary of the status of geothermal leasing, exploration, and development in major physiographic regions where geothermal resource potential has been identified. Recent state-specific activities are reported at the end of each state status report, while recent activities of a more general nature are summarized briefly in Part 2 of the report. A list of recent publications of potential interest to the geothermal community and a directory of contributors to the geothermal progress monitoring system are also included.

  19. Extensive Functional Evaluations to Monitor Aerobic Training in Becker Muscular Dystrophy: A Case Report

    PubMed Central

    Tramonti, Caterina; Rossi, Bruno; Chisari, Carmelo

    2016-01-01

    Low-intensity aerobic training seems to have positive effects on muscle strength, endurance and fatigue in Becker Muscular Dystrophy (BMD) patients. We describe the case of a 33-year old BMD man, who performed a four-week aerobic training. Extensive functional evaluations were executed to monitor the efficacy of the rehabilitative treatment. Results evidenced an increased force exertion and an improvement in muscle contraction during sustained exercise. An improvement of walk velocity, together with agility, endurance capacity and oxygen consumption during exercise was observed. Moreover, an enhanced metabolic efficiency was evidenced, as shown by reduced lactate blood levels after training. Interestingly, CK showed higher levels after the training protocol, revealing possible muscle damage. In conclusion, aerobic training may represent an effective method improving exercise performance, functional status and metabolic efficiency. Anyway, a careful functional assessment should be taken into account as a useful approach in the management of the disease’s rehabilitative treatment. PMID:27478558

  20. Fresh Kills leachate treatment and minimization study: Volume 2, Modeling, monitoring and evaluation. Final report

    SciTech Connect

    Fillos, J.; Khanbilvardi, R.

    1993-09-01

    The New York City Department of Sanitation is developing a comprehensive landfill leachate management plan for the Fresh Kills landfill, located on the western shore of Staten Island, New York. The 3000-acre facility, owned and operated by the City of New York, has been developed into four distinct mounds that correspond to areas designated as Sections 1/9, 2/8, 3/4 and 6/7. In developing a comprehensive leachate management plan, the estimating leachate flow rates is important in designing appropriate treatment alternatives to reduce the offsite migration that pollutes both surface water and groundwater resources.Estimating the leachate flow rates from Sections 1/9 and 6/7 was given priority using an available model, hydrologic evaluation of landfill performance (HELP), and a new model, flow investigation for landfill leachate (FILL). The field-scale analysis for leachate flow included data collection of the leachate mound-level from piezometers and monitoring wells installed on-site, for six months period. From the leachate mound-head contours and flow-gradients, Leachate flow rates were computed using Darcy`s Law.

  1. Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY09 Annual Report

    SciTech Connect

    Johnson, Gary E.

    2009-10-22

    This document is the annual report for fiscal year 2009 (FY09) for the project called Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers [Corps or USACE], U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS).

  2. Lake Roosevelt Fisheries Evaluation Program : Limnological and Fisheries Monitoring Annual Report 1999.

    SciTech Connect

    McLellan, Holly; Lee, Chuck; Scofield, Ben; Pavlik, Deanne

    1999-08-01

    the recreational visits to the region. An increase in popularity has placed Lake Roosevelt fifth amongst the most visited State and Federal parks in Washington. Increased use of the reservoir prompted amplified efforts to enhance the Native American subsistence fishery and the resident sport fishery in 1984 with hatchery supplementation of rainbow trout (O. mykiss) and kokanee salmon (O. nerka). This was followed by the formation of the Spokane Tribal Lake Roosevelt Monitoring Project (LRMP) in 1988 and later by formation of the Lake Roosevelt Data Collection Project in 1991. The Lake Roosevelt Data Collection Project began in July 1991 as part of the BPA, Bureau of Reclamation, and U.S. Army Corps of Engineers System Operation Review process. This process sought to develop an operational scenario for the federal Columbia River hydropower system to maximize the in-reservoir fisheries with minimal impacts to all other stakeholders in the management of the Columbia River. The Lake Roosevelt Monitoring/Data Collection Program (LRMP) is the result of a merger between the Lake Roosevelt Monitoring Program (BPA No. 8806300) and the Lake Roosevelt Data Collection Project (BPA No. 9404300). These projects were merged in 1996 forming the Lake Roosevelt Monitoring Program (LRMP), which continues the work historically completed under the separate projects. The LRMP has two main goals. The first is to develop a biological model for Lake Roosevelt that will predict in-reservoir biological responses to a range of water management operational scenarios, and to develop fisheries and reservoir management strategies accordingly. The model will allow identification of lake operations that minimize impacts on lake biota while addressing the needs of other interests (e.g. flood control, hydropower generation, irrigation, and downstream resident and anadromous fisheries). Major components of the model will include: (1) quantification of entrainment and other impacts to phytoplankton

  3. Program to monitor and evaluate a passive solar greenhouse/aquaculture system. Final report

    SciTech Connect

    Not Available

    1982-01-01

    A temperature monitoring program of Amity's solar greenhouse demonstrated that air, soil, and water temperatures can be maintained at optimal levels without supplemental heat. A foil reflector placed in front of the greenhouse glazing at an angle of between 0 and 5/sup 0/ above horizontal enhanced direct light entering the greenhouse by as much as 22%. Aquaculture in the water heat storage of a solar greenhouse has been a success. Fish reached harvest size in about seven months. The two species that were received the best by the public were African perch (Tilapia mossambica) and channel catfish (Ictalurus punctatus). Although carp (Cyprinus carpio) were the fastest growers they were not well received by the public. Linking hydroponics to greenhouse aquaculture shows a lot of promise. Different support medias were examined and tomatoes and European cucumbers were raised successfully. A savonius windmill was successfully linked to an aquaculture aeration system but because of the wind pattern in the Willamette valley the windmill system did not provide air in the evening when it was needed most. Alternate designs are discussed. Locally grown fish diets were evaluated for their ability to promote fish growth. Diets such as water hyacinth, duckweed, earthworms, beans, and comfrey were raised on the Amity site, pelleted with a hand grinder and solar dried. Duckweed and earthworms appear to hold promise for a nutritous, easy to grow and pelletize, food source. Amity's solar greenhouse, three coldframe designs and a PVC tunnel cloche were compared in a vegetable growing trial. Most impressive was the cloche design because it provided adequate protection, was inexpensive and very easy to build.

  4. LONG PATH LASER OZONE MONITOR EVALUATION

    EPA Science Inventory

    The purpose of the study reported here was to evaluate a long path laser air pollution monitor developed for the U.S. Environmental Protection Agency (EPA) by the General Electric (GE) Company. The monitor was known as ILAMS (Infrared Laser Atmospheric Monitoring System) and desi...

  5. 1999 Environmental Monitoring Program Report

    SciTech Connect

    L. V. Street

    2000-09-01

    This report describes the calendar year 1999 compliance monitoring and environmental surveillance activities of the Idaho National Engineering and Environmental Laboratory management and operating contractor Environmental Monitoring Program. This report includes results of sampling performed by the Drinking Water, Effluent, Storm Water, Groundwater Monitoring, and Environmental Surveillance Programs. This report compares the 1999 results to program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the monitoring and surveillance activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of public health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends, which would indicate a loss of control or unplanned releases from facility operations. The Idaho National Engineering and Environmental Laboratory complied with permits and applicable regulations, with the expectation of nitrogen in two disposal pond effluent streams iron and total coliform bacteria in groundwater downgradient from one disposal well, and coliform bacteria in drinking water systems at two facilities. Maintenance activities were performed on the two drinking water systems and tested prior to putting back into service. The monitoring and surveillance results demonstrate that the public health and environment were protected.

  6. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 1999 Annual Report.

    SciTech Connect

    Boe, Stephen J.; Lofy, Peter T.

    2002-11-01

    This is the second annual report of a multi-year, multi-agency project to restore spring chinook salmon populations in the Grande Ronde River Basin (Grande Ronde Endemic Chinook Salmon Program--GRESCP). The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operates adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to increase natural production and restore fisheries in these two streams. Statement of Work Objectives for 1999: (1) Participate in development and continued implementation of the comprehensive multi year operations plan for the Grande Ronde Endemic Supplementation Program. (2) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (3) Monitor adult endemic spring chinook salmon populations and collect broodstock. (4) Plan detailed Monitoring and Evaluation for future years. (5) Monitor population abundance and characteristics and local environmental factors that may influence abundance and run timing of Grande Ronde River spring chinook populations. (6) Participate in Monitoring and Evaluation of the captive brood component of the Program to assure this component is contributing to the Program. (7) Participate in data collection for incidentally-caught bull trout and summer steelhead and planning for recovery of summer steelhead populations. (8) Document accomplishments and needs to permitters, comanagers, and funding agencies. (9) Communicate project results to the scientific community.

  7. Evaluation of the D-Area Expanded Operable Unit for Monitored Natural Attenuation of Inorganic Constituents of Concern: Interim Report

    SciTech Connect

    Powell, K.R.

    2003-01-08

    A comprehensive approach is being developed to evaluate SRS sites with inorganic constituents of concern (COCs) for potential implementation of monitored natural attenuation (MNA) as a remediation strategy. In order to invoke MNA, the operative, or controlling, attenuation mechanisms at a given site must be identified and demonstrated using a technically defensible approach and site-specific data. This report details ongoing research in the application of this approach at the D-Area expanded operable unit (DEXOU). Initial screening of the DEXOU described in this interim report indicates that natural attenuation of inorganic COCs (low pH, Cr, Ni, Se, and As) is occurring to a significant degree. This work is part of continuing efforts to characterize the natural attenuation processes, both abiotic and biotic, occurring at this location and likely occurring at other SRS sites with inorganic COCs.

  8. Monitoring and Evaluation: Statistical Support for Life-cycle Studies, Annual Report 2003.

    SciTech Connect

    Skalski, John

    2003-11-01

    and organizations would be incapable of maintaining a center of expertise. The mission of the project is to help assure tagging studies are designed and analyzed from the onset to extract the best available information using state-of-the-art statistical methods. The overarching goals of the project is to assure statistically sound survival studies so that fish managers can focus on the management implications of their findings and not be distracted by concerns whether the studies are statistically reliable or not. Specific goals and objectives of the study include the following: (1) Provide consistent application of statistical methodologies for survival estimation across all salmon life cycle stages to assure comparable performance measures and assessment of results through time, to maximize learning and adaptive management opportunities, and to improve and maintain the ability to responsibly evaluate the success of implemented Columbia River FWP salmonid mitigation programs and identify future mitigation options. (2) Improve analytical capabilities to conduct research on survival processes of wild and hatchery chinook and steelhead during smolt outmigration, to improve monitoring and evaluation capabilities and assist in-season river management to optimize operational and fish passage strategies to maximize survival. (3) Extend statistical support to estimate ocean survival and in-river survival of returning adults. Provide statistical guidance in implementing a river-wide adult PIT-tag detection capability. (4) Develop statistical methods for survival estimation for all potential users and make this information available through peer-reviewed publications, statistical software, and technology transfers to organizations such as NOAA Fisheries, the Fish Passage Center, US Fish and Wildlife Service, US Geological Survey (USGS), US Army Corps of Engineers (USACE), Public Utility Districts (PUDs), the Independent Scientific Advisory Board (ISAB), and other members of

  9. Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring and Evaluation FY08 Annual Report.

    SciTech Connect

    Johnson, GE; Diefenderfer, HL

    2008-09-29

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration (BPA), U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via BPA's project tracking system, Pisces; (4) quarterly project status reports; and (5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on FCRPS operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.

  10. Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY08 Annual Report

    SciTech Connect

    Johnson, Gary E.; Diefenderfer, Heida L.

    2008-09-29

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, Pisces; 4) quarterly project status reports; and 5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on hydrosystem operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.

  11. Benzene Monitor System report

    SciTech Connect

    Livingston, R.R.

    1992-10-12

    Two systems for monitoring benzene in aqueous streams have been designed and assembled by the Savannah River Technology Center, Analytical Development Section (ADS). These systems were used at TNX to support sampling studies of the full-scale {open_quotes}SRAT/SME/PR{close_quotes} and to provide real-time measurements of benzene in Precipitate Hydrolysis Aqueous (PHA) simulant. This report describes the two ADS Benzene Monitor System (BMS) configurations, provides data on system operation, and reviews the results of scoping tests conducted at TNX. These scoping tests will allow comparison with other benzene measurement options being considered for use in the Defense Waste Processing Facility (DWPF) laboratory. A report detailing the preferred BMS configuration statistical performance during recent tests has been issued under separate title: Statistical Analyses of the At-line Benzene Monitor Study, SCS-ASG-92-066. The current BMS design, called the At-line Benzene Monitor (ALBM), allows remote measurement of benzene in PHA solutions. The authors have demonstrated the ability to calibrate and operate this system using peanut vials from a standard Hydragard{trademark} sampler. The equipment and materials used to construct the ALBM are similar to those already used in other applications by the DWPF lab. The precision of this system ({+-}0.5% Relative Standard Deviation (RSD) at 1 sigma) is better than the purge & trap-gas chromatograpy reference method currently in use. Both BMSs provide a direct measurement of the benzene that can be purged from a solution with no sample pretreatment. Each analysis requires about five minutes per sample, and the system operation requires no special skills or training. The analyzer`s computer software can be tailored to provide desired outputs. Use of this system produces no waste stream other than the samples themselves (i.e. no organic extractants).

  12. Acoustic sensor engineering evaluation test report. [microphones for monitoring inside the space shuttle orbiter

    NASA Technical Reports Server (NTRS)

    Phillips, E. L., Jr.; Bronson, R. D.

    1976-01-01

    Two types of one-inch diameter sound pressure level sensors, which are candidates for monitoring ambient noise in the shuttle orbiter crew compartment during rest periods, were exposed to temperature, passive humidity, and vibration. One unexposed sensor of each type served as a reference unit. Except for the humidity exposures, each of the three capacitive microphones was individually tested in sequence with the essential voltage power supply and preamplifier. One unit exibited anomalous characteristics after the humidity exposure but returned to normal after being dried in an oven at 115 deg for two hours. Except for the humidity exposures, each of the three piezoelectric microphones was individually tested with a laboratory type amplifier. Two apparent failures occurred during these tests. The diaphragm on one was found ruptured after the fourth cycle of the humidity test. A second sensor showed an anomaly after the random vibration tests at which time its sensitivity was consistent at about one-half its former value.

  13. Evaluation and Monitoring of Idaho Habitat Enhancement and Anadromous Fish Natural Production : Annual Report 1986.

    SciTech Connect

    Petrosky, Charles E.; Holubetz, Terry B.

    1987-11-01

    The Idaho Department of Fish and Game (IDFG) has been conducting an evaluation of existing and proposed habitat improvement projects for anadromous fish in the Clearwater River and Salmon River drainages over the last 3 years. Projects included in the evaluation are funded by or proposed for funding by the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. This evaluation project is also funded under the same authority. A mitigation record is being developed to use increased smolt production (i.e., yield) at full-seeding as the best measure of benefit from a habitat enhancement project. Determination of full benefit from a project depends on completion or maturation of the project and presence of adequate numbers of fish to document actual increases in fish production. The depressed nature of upriver anadromous stocks have precluded measuring full benefits of any habitat enhancement project in Idaho. Partial benefit will be credited to the mitigation record in the interim period of run restoration.

  14. Evaluation and Monitoring of Wild/Natural Steelhead Production, 1995 Annual Report.

    SciTech Connect

    Holubetz, Terry B.; Leth, Brian D. (Idaho Department of Fish and Game, Fisheries Research Section, Boise, ID

    1997-05-01

    Several key study streams in the Salmon River and Clearwater River drainages were snorkeled in the summer of 1995. The current Idaho Department of Fish and Game (IDFG) goal is to maintain a parr density at 70% of the rated carrying capacity. All streams snorkeled are considerably below the current goal (6.4% to 54.3% of goal). Weirs were operated in Chamberlain Creek, West Fork Chamberlain Creek, Running Creek, and Rush Creek during the spring adult steelhead Oncorhynchus mykiss spawning migration. An adult steelhead migration barrier was operated in Rapid River. Adult steelhead escapements in all but Rapid River are at critically low levels. An adult salmon 0. sp. weir was operated in Running Creek using a new passive electronic/video counting facility. Five adult chinook salmon 0. fshawyfscha were captured on video as they passed the counting facility. A video record of all resident fish in excess of 10 to 12 in was also obtained. The video system performed adequately in most circumstances. Additional testing and modification will continue during the 1996 salmon spawning migration. An upstream migration barrier was operated in Rapid River during the salmon spawning migration. Four adult male salmon were passed above the barrier; no females were captured or passed above the barrier. Rotary screw traps were operated in Running Creek and Rapid River during the spring and fall to monitor the juvenile steelhead and salmon downstream migration. Migration timing in Running Creek indicates that the majority of smolt size fish moved downstream out of Running Creek in the fall and few smolt size fish left Running Creek in the spring. Migration timing at Rapid River indicates a more equal distribution of the smolt size fish moving downstream out of Rapid River in the spring. Juvenile steelhead were PIT-tagged in Chamberlain Creek, Running Creek and Rapid River during the summer and fall of 1995. Detections at the lower Snake and Columbia rivers from the 1994 tagging

  15. Asotin Creek Instream Habitat Alteration Projects : Habitat Evaluation, Adult and Juvenile Habitat Utilization and Water Temperature Monitoring : 2001 Progress Report.

    SciTech Connect

    Bumgarner, Joseph D.

    2002-01-01

    projects to improve fish habitat. In 1998, the ACCD identified the need for a more detailed analysis of these instream projects to fully evaluate their effectiveness at improving fish habitat. Therefore, ACCD contracted with WDFW's Snake River Lab (SRL) to take pre- and post-construction measurements of the habitat (i.e., pools, LOD, width, depth) at each site, and to evaluate fish use within some of the altered sites. These results have been published annually as progress reports to the ACCD (Bumgarner et al. 1999, Wargo et al. 2000, and Bumgarner and Schuck 2001). The ACCD also contracted with the WDFW SRL to conduct other evaluation and monitoring in the stream such as: (1) conduct snorkel surveys at habitat alteration sites to document fish usage following construction, (2) deploy temperature monitors throughout the basin to document summer water temperatures, and (3) attempt to document adult fish utilization by documenting the number of steelhead redds associated with habitat altered areas. This report provides a summary of pre-construction measurements taken on three proposed Charley Creek habitat sites during 2001, two sites in main Asotin Creek, and one site in George Creek, a tributary that enters in the lower Asotin Creek basin. Further, it provides a comparison of measurements taken pre- and post-construction on three 1999 habitat sites taken two years later, but at similar river flows. It also presents data collected from snorkel surveys, redd counts, and temperature monitoring.

  16. Yakima River Species Interactions Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2004-2005 Annual Report.

    SciTech Connect

    Pearsons, Todd N.; Temple, Gabriel M.; Fritts, Anthony L.

    2005-05-01

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from the Washington Department of Fish and Wildlife (WDFW) to the Bonneville Power Administration (BPA), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning, and (2) summarize results of research that have broader scientific relevance. This is the thirteenth of a series of progress reports that address species interactions research and supplementation monitoring of fishes in response to supplementation of salmon and steelhead in the upper Yakima River basin (Hindman et al. 1991; McMichael et al. 1992; Pearsons et al. 1993; Pearsons et al. 1994; Pearsons et al. 1996; Pearsons et al. 1998, Pearsons et al. 1999, Pearsons et al. 2001a, Pearsons et al. 2001b, Pearsons et al. 2002, Pearsons et al. 2003, Pearsons et al. 2004). Journal articles and book chapters have also been published from our work (McMichael 1993; Martin et al. 1995; McMichael et al. 1997; McMichael and Pearsons 1998; McMichael et al. 1998; Pearsons and Fritts 1999; McMichael et al. 1999; McMichael et al. 1999; Pearsons and Hopley 1999; Ham and Pearsons 2000; Ham and Pearsons 2001; Amaral et al. 2001; McMichael and Pearsons 2001; Pearsons 2002, Fritts and Pearsons 2004, Pearsons et al. in press, Major et al. in press). This progress report summarizes data collected between January 1, 2004 and December 31, 2004. These data were compared to findings from previous years to identify general trends and make preliminary comparisons. Interactions between fish produced as part of the YKFP, termed target species or stocks, and other species or stocks (non-target taxa) may alter the population status of non-target species or stocks. This may occur through a variety of mechanisms, such as competition, predation, and interbreeding (Pearsons et al. 1994; Busack et al. 1997; Pearsons and Hopley 1999). Furthermore, the success of a supplementation program may

  17. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    SciTech Connect

    Knedsen, Curtis M.; Schroder, Steven L.; Johnston, Mark V.

    2006-05-01

    This report covers three of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME) and was completed by Oncorh Consulting as a contract deliverable to the Yakama Nation and Washington Department of Fish and Wildlife. The YKFPME (Project Number 1995-063-25) is funded under two BPA contracts, one for the Yakama Nation (Contract No. 00022449) and the other for the Washington Department of Fish and Wildlife (Contract No. 22370). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME.

  18. Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY10 Annual Report

    SciTech Connect

    Johnson, Gary E.

    2010-10-26

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. The EOS is one of multiple work groups in the federal research, monitoring, and evaluation (RME) effort developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the FCRPS. The EOS is tasked by NOAA Fisheries and the Action Agencies to design and coordinate implementation of the federal RME plan for the lower Columbia River and estuary, including the plume.

  19. Management Plan for Experimental Reintroduction of Sockeye into Skaha Lake; Proposed Implementation, Monitoring, and Evaluation, 2004 Technical Report.

    SciTech Connect

    Wright, Howie; Smith, Howard

    2004-01-01

    but with the proviso that there should be a thorough evaluation and reporting of progress and results. A 2004 start on implementation and monitoring has now been proposed.

  20. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2000-2001 Annual Report.

    SciTech Connect

    Busack, Craig A.; Schroder, Steven L.; Young, Sewall F.

    2002-11-01

    work through the end of the contract period, so does not include developments beyond that point. As such, combined with the upcoming 2002 report, it will provide a complete record of our process through the experimental design revision process. The current report contains the following: (1) An explanation of the general concept of domestication, and why domestication is a concern in the YKFP spring chinook program; (2) A discussion of the basics of experimental design for domestication; (3) A history of domestication experimental design for domestication in the YKFP; (4) A review of potential designs that would answer the ISRP's criticisms; (5) A revised design containing the following elements--A control line under continuous hatchery culture (i.e.; no spawning in the wild); use of the Naches population, where appropriate, as a wild control line; (6) Cryopreservation of sperm for later evaluation of long-term genetic trend; and (7) Continuous monitoring of phenotypic trend in the supplemented line.

  1. Spring Chinook Salmon Interactions Indices and Residual/Precocial Monitoring in the Upper Yakima Basin; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2001-2002 Annual Report.

    SciTech Connect

    Pearsons, Todd N.; James, Brenda B.; Johnson, Christopher L.

    2003-05-01

    This report examines some of the factors that can influence the success of supplementation, which is currently being tested in the Yakima Basin using upper Yakima stock of spring chinook salmon. Supplementation success in the Yakima Basin is defined relative to four topic areas: natural production, genetics, ecological interactions, and harvest (Busack et al. 1997). The success of spring chinook salmon supplementation in the Yakima Basin is dependent, in part, upon fish culture practices and favorable physical and biological conditions in the natural environment (Busack et al. 1997). Shortfalls in either of these two topics (i.e., failure in culturing many fish that have high long-term fitness or environmental conditions that constrain spring chinook salmon production) will cause supplementation success to be limited. For example, inadvertent selection or propagation of spring chinook that residualize or precocially mature may hinder supplementation success. Spring chinook salmon that residualize (do not migrate during the normal migration period) may have lower survival rates than migrants and, additionally, may interact with wild fish and cause unacceptable impacts to non-target taxa. Large numbers of precocials (nonanadromous spawners) may increase competition for females and significantly skew ratios of offspring sired by nonanadromous males, which could result in more nonanadromous spring chinook in future generations. Conditions in the natural environment may also limit the success of spring chinook supplementation. For example, intra or interspecific competition may constrain spring chinook salmon production. Spring chinook salmon juveniles may compete with each other for food or space or compete with other species that have similar ecological requirements. Monitoring of spring chinook salmon residuals, precocials, prey abundance, carrying capacity, and competition will help researchers interpret why supplementation is working or not working (Busack et al

  2. A laboratory evaluation of color video monitors

    SciTech Connect

    Terry, P.L.

    1993-07-01

    Sandia National Laboratories has considerable experience with monochrome video monitors used in alarm assessment video systems. Most of these systems, used for perimeter protection, were designed to classify rather than to identify intruders. There is a growing interest in the identification function of security video systems for both access control and insider protection. Because color video technology is rapidly changing and because color information is useful for identification purposes, Sandia National Laboratories established a program to evaluate the newest relevant color video equipment. This report documents the evaluation of an integral component, color monitors. It briefly discusses a critical parameter, dynamic range, details test procedures, and evaluates the results.

  3. Ecological Monitoring and Compliance Program 2009 Report

    SciTech Connect

    Hansen, J. Dennis; Anderson, David C.; Hall, Derek B.; Greger, Paul D.; Ostler, W. Kent

    2010-07-13

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC, during calendar year 2009. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex. During 2009, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

  4. Ecological Monitoring and Compliance Program 2011 Report

    SciTech Connect

    Hansen, D. J.; Anderson, D. C.; Hall, D. B.; Greger, P. D.; Ostler, W. K.

    2012-06-13

    The Ecological Monitoring and Compliance (EMAC) Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada National Security Site and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program's activities conducted by National Security Technologies, LLC, during calendar year 2011. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring of the Nonproliferation Test and Evaluation Complex. During 2011, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

  5. Ecological Monitoring and Compliance Program 2010 Report

    SciTech Connect

    Hansen, D.J.; Anderson, D.C.; Hall, D.B.; Greger, P.D.; Ostler, W.K.

    2011-07-01

    The Ecological Monitoring and Compliance (EMAC) Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2010. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). During 2010, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

  6. Ecological Monitoring and Compliance Program 2012 Report

    SciTech Connect

    Hall, Derek B.; Anderson, David C.; Greger, Paul D.; Ostler, W. Kent; Hansen, Dennis J.

    2013-07-03

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2012. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). During 2012, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

  7. Ecological Monitoring and Compliance Program 2008 Report

    SciTech Connect

    Hansen, Dennis J.; Anderson, David C.; Hall, Derek B.; Greger, Paul D.; Ostler, W. Kent

    2009-04-30

    The Ecological Monitoring and Compliance Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2008. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC).

  8. 1984 environmental monitoring report

    SciTech Connect

    Day, L.E.; Miltenberger, R.P.; Naidu, J.R.

    1985-04-01

    The environmental monitoring program has been designed to ensure that BNL facilities operate such that the applicable environmental standards and effluent control requirements have been met. A listing, as required by DOE Order 5484.1 of BNL facilities, of environmental agencies and permits is provided in the Environmental Program Information Section 3.0, Table B. Since the aquifer underlying Long Island has been designated a ''sole source'' aquifer, the Environmental Protection Agency (EPA) Drinking Water Standards have been used in the assessment of ground water data. However, the limits prescribed in the regulations are not directly applicable to the monitoring well data since (1) the standards apply to a community water supply system, i.e., one serving more than 25 individuals, and (2) the standards represent an annual average concentration. Since the monitoring wells are not components of the Laboratory's water supply system, the EPA drinking water standards are employed as reference criteria to which the surveillance well data is compared. The standards also serve as guidance levels for any appropriate remedial action. 36 refs., 9 figs., 40 tabs.

  9. The Computer-based Health Evaluation Software (CHES): a software for electronic patient-reported outcome monitoring

    PubMed Central

    2012-01-01

    Background Patient-reported Outcomes (PROs) capturing e.g., quality of life, fatigue, depression, medication side-effects or disease symptoms, have become important outcome parameters in medical research and daily clinical practice. Electronic PRO data capture (ePRO) with software packages to administer questionnaires, storing data, and presenting results has facilitated PRO assessment in hospital settings. Compared to conventional paper-pencil versions of PRO instruments, ePRO is more economical with regard to staff resources and time, and allows immediate presentation of results to the medical staff. The objective of our project was to develop software (CHES – Computer-based Health Evaluation System) for ePRO in hospital settings and at home with a special focus on the presentation of individual patient’s results. Methods Following the Extreme Programming development approach architecture was not fixed up-front, but was done in close, continuous collaboration with software end users (medical staff, researchers and patients) to meet their specific demands. Developed features include sophisticated, longitudinal charts linking patients’ PRO data to clinical characteristics and to PRO scores from reference populations, a web-interface for questionnaire administration, and a tool for convenient creating and editing of questionnaires. Results By 2012 CHES has been implemented at various institutions in Austria, Germany, Switzerland, and the UK and about 5000 patients participated in ePRO (with around 15000 assessments in total). Data entry is done by the patients themselves via tablet PCs with a study nurse or an intern approaching patients and supervising questionnaire completion. Discussion During the last decade several software packages for ePRO have emerged for different purposes. Whereas commercial products are available primarily for ePRO in clinical trials, academic projects have focused on data collection and presentation in daily clinical practice and

  10. EVALUATION OF HCL CONTINUOUS EMISSION MONITORS

    EPA Science Inventory

    This report presents the findings obtained from the field evaluation of commercially available HCl monitoring equipment at a municipal waste-fired boiler which was not equipped with HCl emission control equipment. The analyzers were operated continuously during a two-month test p...

  11. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2001-2002 Annual Report.

    SciTech Connect

    Busack, Craig A.; Fritts, Anthony L.; Loxterman, Janet

    2003-05-01

    In chapter 1 we report on studies of the population genetic structure, using DNA microsatellites, of steelhead collected from different locations in the Yakima River basin (Roza Dam, Ahtanum Creek, Toppenish Creek, and Satus Creek) in 2000 and 2001. Of 28 pairwise tests of genotypic differentiation, only the 2000 and 2001 Roza Dam collections and the 2000 and 2001 Satus Creek collections did not exhibit significant differences. Similarly, pairwise tests of genetic differentiation (FST) were significant for all comparisons except the between-years comparisons of Roza Dam, Toppenish Creek, and Satus Creek collections. All tests between populations sampled from different localities were significant, indicating that these collections represent genetically differentiated stocks. In chapter 2 we report on genetic comparisons, again using microsatellites, of the three spring chinook populations in the Yakima basin (Upper Yakima, Naches, and American) with respect to our ability to be able to estimate the proportions of the three populations in mixed smolt samples collected at Chandler. We evaluated this both in terms of mixed fishery analysis, where proportions are estimated, but the likely provenance of any particular fish is unknown, and classification, where an attempt is made to assign individual fish to their population of origin. Simulations were done over the entire ranged of stock proportions observed in the Yakima basin in the last 20+ years. Stock proportions can be estimated very accurately by either method. Chapter 3 reports on our ongoing effort at cryopreserving semen from wild Upper Yakima spring chinook. In 2002, semen from 91 males, more than 50% of those spawned, was cryopreserved. Representation over the spawning season was excellent. Chapters 4,5, and 6 all relate to the continuing development of the domestication study design. Chapter 4 details the ISRP consultations and evolution of the design from last year's preferred alternative to the current

  12. Ecological Monitoring and Compliance Program 2007 Report

    SciTech Connect

    Hansen, Dennis; Anderson, David; Derek, Hall; Greger, Paul; Ostler, W. Kent

    2008-03-01

    In accordance with U.S. Department of Energy (DOE) Order 450.1, 'Environmental Protection Program', the Office of the Assistant Manager for Environmental Management of the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) requires ecological monitoring and biological compliance support for activities and programs conducted at the Nevada Test Site (NTS). National Security Technologies, LLC (NSTec), Ecological Services has implemented the Ecological Monitoring and Compliance (EMAC) Program to provide this support. EMAC is designed to ensure compliance with applicable laws and regulations, delineate and define NTS ecosystems, and provide ecological information that can be used to predict and evaluate the potential impacts of proposed projects and programs on those ecosystems. This report summarizes the EMAC activities conducted by NSTec during calendar year 2007. Monitoring tasks during 2007 included eight program areas: (a) biological surveys, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) biological monitoring at the Nonproliferation Test and Evaluation Complex (NPTEC). The following sections of this report describe work performed under these eight areas.

  13. 1982 environmental monitoring report

    SciTech Connect

    Day, L.E.; Naidu, J.R.

    1983-04-01

    The environmental levels of radioactivity and other pollutants found in the vicinity of BNL during 1982 are summarized in this report. As an aid in the interpretation of the data, the amounts of radioactivity and other pollutants released in airborne and liquid effluents from Laboratory facilities to the environment are also indicated. The environmental data include external radiation levels; radioactive air particulates; tritium concentrations; the amounts and concentrations of radioactivity in and the water quality of the stream into which liquid effluents are released; the concentrations of radioactivity in biota from the stream; the concentrations of radioactivity in and the water quality of ground waters underlying the Laboratory; and concentrations of radioactivity in milk samples obtained in the vicinity of the Laboratory. 30 references, 9 figures, 18 tables.

  14. 1981 environmental monitoring report

    SciTech Connect

    Naidu, J.R.; Olmer, L.L.

    1982-04-01

    The environmental levels of radioactivity and other pollutants found in the vicinity of BNL during 1981 are summarized in this report. As an aid in the interpretation of the data, the amounts of radioactivity and other pollutants released in airborne and liquid effluents from Laboratory facilities to the environment are also indicated. The environmental data includes external radiation levels; radioactive air particulates; tritium and iodine concentrations; the amounts and concentrations of radioactivity in and the water quality of the stream into which liquid effluents are released; the concentrations of radioactivity in sediments and biota from the stream; the concentrations of radioactivity in and the water quality of ground waters underlying the Laboratory; and concentrations of radioactivity in milk samples obtained in the vicinity of the Laboratory. 28 references, 9 figures, 20 tables.

  15. Class 3 Tracking and Monitoring System Report

    SciTech Connect

    Safely, Eugene; Salamy, S. Phillip

    1999-11-29

    The objective of Class 3 tracking system are to assist DOE in tracking and performance and progress of these projects and to capture the technical and financial information collected during the projects' monitoring phase. The captured information was used by DOE project managers and BDM-Oklahoma staff for project monitoring and evaluation, and technology transfer activities. The proposed tracking system used the Class Evaluation Executive Report (CLEVER), a relation database for storing and disseminating class project data; GeoGraphix, a geological and technical analysis and mapping software system; the Tertiary Oil Recovery Information System (TORIS) database; and MS-Project, a project management software system.

  16. INTEC Groundwater Monitoring Report 2006

    SciTech Connect

    J. R. Forbes S. L. Ansley M. Leecaster

    2007-02-01

    This report summarizes 2006 perched water and groundwater monitoring activities at the Idaho Nuclear Technology and Engineering Center (INTEC) located at the Idaho National Laboratory (INL). During 2006, groundwater samples were collected from a total of 22 Snake River Plain Aquifer (SRPA) monitoring wells, plus six aquifer wells sampled for the Idaho CERCLA Disposal Facility (ICDF) monitoring program. In addition, perched water samples were collected from 21 perched wells and 19 suction lysimeters. Groundwater and perched water samples were analyzed for a suite of radionuclides and inorganic constituents. Laboratory results in this report are compared to drinking water maximum contaminant levels (MCLs). Such comparison is for reference only and it should be noted that the Operable Unit 3-13 Record of Decision does not require that perched water comply with drinking water standards.

  17. Monitoring and Evaluation of Yearling Fall Chinook Salmon Released from Acclimation Facilities Upstream of Lower Granite Dam; 1998 Annual Report.

    SciTech Connect

    Rocklage, Stephen J.

    2004-01-01

    The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery (Snake River stock) yearling fall chinook salmon that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 1998. The three fall chinook acclimation facilities are operated by the Nez Perce Tribe and located at Pittsburg Landing and Captain John Rapids on the Snake River and at Big Canyon Creek on the Clearwater River. Yearlings at the Big Canyon facility consisted of two size classes that are referred to in this report as 9.5 fish per pound (fpp) and 30 fpp. The Big Canyon 9.5 fpp were comparable to the yearlings at Pittsburg Landing, Captain John Rapids and Lyons Ferry Hatchery. A total of 9,942 yearlings were PIT tagged and released at Pittsburg Landing. PIT tagged yearlings had a mean fork length of 159.9 mm and mean condition factor of 1.19. Of the 9,942 PIT tagged fish released, a total of 6,836 unique tags were detected at mainstem Snake and Columbia River dams (Lower Granite, Little Goose, Lower Monumental and McNary). A total of 4,926 9.5 fpp and 2,532 30 fpp yearlings were PIT tagged and released at Big Canyon. PIT tagged 9.5 fpp yearlings had a mean fork length of 156.9 mm and mean condition factor of 1.13. PIT tagged 30 fpp yearlings had a mean fork length of 113.1 mm and mean condition factor of 1.18. Of the 4,926 PIT tagged 9.5 fpp yearlings released, a total of 3,042 unique tags were detected at mainstem Snake and Columbia River dams. Of the 2,532 PIT tagged 30 fpp yearlings released, a total of 1,130 unique tags were detected at mainstem Snake and Columbia River dams. A total of 1,253 yearlings were PIT tagged and released at Captain John Rapids. PIT tagged yearlings had a mean fork length of 147.5 mm and mean condition factor of 1.09. Of

  18. Sanitary landfill groundwater monitoring report

    SciTech Connect

    Not Available

    1993-02-01

    The Sanitary Landfill at the Savannah River Site (SRS) is composed of the original 32-acre landfill, plus expansion areas to the north and south that added 16 and 22 acres, respectively, to the facility. The landfill is subject to the requirements of the Resource Conservation and Recovery Act and currently operates under South Carolina Department of Health and Environmental Control (SCDHEC) Domestic Waste Permit 87A. Fifty-seven wells of the LFW series monitor the groundwater quality in Steed Pond Aquifer (formerly Aquifer Zone I/IIC[sub 2]) (Water Table) beneath the Sanitary Landfill. These wells are sampled quarterly for certain indicator parameters, inorganics, metals, radionuclides, volatile organics, and other constituents as part of the SRS Groundwater Monitoring Program and to comply with the SCDHEC domestic waste permit. This report reviews the 1992 activities of the SRS Groundwater Monitoring Program.

  19. Pathogen Screening of Naturally Produced Yakima River Spring Chinook Smolts; Yakima/Klickitat Fisheries Project Monitoring and Evaluation Report 6 of 7, 2003-2004 Annual Report.

    SciTech Connect

    Thomas, Joan B.

    2004-05-01

    In 1999 the Cle Elum Hatchery began releasing spring chinook salmon smolts into the upper Yakima River to increase natural production. Part of the evaluation of this program is to monitor whether introduction of hatchery produced smolts would impact the prevalence of specific pathogens in the naturally produced spring chinook smolts. Increases in prevalence of any of these pathogens could negatively impact the survival of these fish. In 1998 and 2000 through 2003 naturally produced smolts were collected for monitoring at the Chandler smolt collection facility on the lower Yakima River. Smolts were collected from mid to late outmigration, with a target of 200 fish each year. The pathogens monitored were infectious hematopoeitic necrosis virus, infectious pancreatic necrosis virus, viral hemorrhagic septicemia virus, Flavobacterium psychrophilum, Flavobacterium columnare, Aeromonas salmonicida, Yersinia ruckeri, Edwardsiella ictaluri, Renibacterium salmoninarum and Myxobolus cerebralis. To date, only the bacterial pathogens have been detected and prevalences have been low. Prevalences have varied each year and these changes are attributed to normal fluctuation of prevalence. All of the pathogens detected are widely distributed in Washington State.

  20. Spring Chinook Salmon Oncorhynchus tshawytscha Supplementation in the Clearwater Subbasin ; Nez Perce Tribal Hatchery Monitoring and Evaluation Project, 2007 Annual Report.

    SciTech Connect

    Backman, Thomas; Sprague, Sherman; Bretz, Justin

    2009-06-10

    The Nez Perce Tribal Hatchery (NPTH) program has the following goals (BPA, et al., 1997): (1) Protect, mitigate, and enhance Clearwater Subbasin anadromous fish resources; (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater Subbasin; (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project initiation; (4) Sustain long-term fitness and genetic integrity of targeted fish populations; (5) Keep ecological and genetic impacts to non-target populations within acceptable limits; and (6) Promote Nez Perce Tribal management of Nez Perce Tribal Hatchery Facilities and production areas within Nez Perce Treaty lands. The NPTH program was designed to rear and release 1.4 million fall and 625,000 spring Chinook salmon. Construction of the central incubation and rearing facility NPTH and spring Chinook salmon acclimation facilities were completed in 2003 and the first full term NPTH releases occurred in 2004 (Brood Year 03). Monitoring and evaluation plans (Steward, 1996; Hesse and Cramer, 2000) were established to determine whether the Nez Perce Tribal Hatchery program is achieving its stated goals. The monitoring and evaluation action plan identifies the need for annual data collection and annual reporting. In addition, recurring 5-year program reviews will evaluate emerging trends and aid in the determination of the effectiveness of the NPTH program with recommendations to improve the program's implementation. This report covers the Migratory Year (MY) 2007 period of the NPTH Monitoring & Evaluation (M&E) program. There are three NPTH spring Chinook salmon treatment streams: Lolo Creek, Newsome Creek, and Meadow Creek. In 2007, Lolo Creek received 140,284 Brood Year (BY) 2006 acclimated pre-smolts at an average weight of 34.9 grams per fish, Newsome Creek received 77,317 BY 2006 acclimated pre-smolts at an average of 24.9 grams

  1. Comprehensive air monitoring plan: general monitoring report

    SciTech Connect

    Not Available

    1980-03-31

    Recommendations are provided for general monitoring of hydrogen sulfide (H/sub 2/S) in ambient air in parts of Colusa, Lake, Mendocino, Napa, and Sonoma counties potentially impacted by emissions from geothermal development projects in the Geysers-Calistoga Known Geothermal Resource Area. Recommendations for types, placement, performance guidelines, and criteria and procedure for triggering establishment and termination of CAMP monitoring equipment were determined after examination of four factors: population location; emission sources; meteorological considerations; and data needs of permitting agencies and applicants. Three alternate financial plans were developed. Locations and equipment for immediate installation are recommended for: two air quality stations in communities where the State ambient air quality standard for H/sub 2/S has been exceeded; three air quality trend stations to monitor progress in reduction of H/sub 2/S emissions; two meteorological observation stations to monitor synoptic wind flow over the area; and one acoustic radar and one rawinsonde station to monitor air inversions which limit the depth of the mixing layer.

  2. Yakima River Species Interactions Study; Yakima/Klickitat Fisheries Project Monitoring and Evaluation Report 7 of 7, 2003-2004 Annual Report.

    SciTech Connect

    Pearsons, Todd N.; Fritts, Anthony L.; Temple, Gabriel M.

    2004-05-01

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from the Washington Department of Fish and Wildlife (WDFW) to the Bonneville Power Administration (BPA), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning, and (2) summarize results of research that have broader scientific relevance. This is the twelfth of a series of progress reports that address species interactions research and supplementation monitoring of fishes in response to supplementation of salmon and steelhead in the upper Yakima River basin (Hindman et al. 1991; McMichael et al. 1992; Pearsons et al. 1993; Pearsons et al. 1994; Pearsons et al. 1996; Pearsons et al. 1998, Pearsons et al. 1999, Pearsons et al. 2001a, Pearsons et al. 2001b, Pearsons et al. 2002, Pearsons et al. 2003). Journal articles and book chapters have also been published from our work (McMichael 1993; Martin et al. 1995; McMichael et al. 1997; McMichael and Pearsons 1998; McMichael et al. 1998; Pearsons and Fritts 1999; McMichael et al. 1999; McMichael et al. 1999; Pearsons and Hopley 1999; Ham and Pearsons 2000; Ham and Pearsons 2001; Amaral et al. 2001; McMichael and Pearsons 2001; Pearsons 2002, Fritts and Pearsons 2004, Pearsons et al. in press, Major et al. in press). This progress report summarizes data collected between January 1, 2003 and December 31, 2003. These data were compared to findings from previous years to identify general trends and make preliminary comparisons. Interactions between fish produced as part of the YKFP, termed target species or stocks, and other species or stocks (non-target taxa) may alter the population status of non-target species or stocks. This may occur through a variety of mechanisms, such as competition, predation, and interbreeding (Pearsons et al. 1994; Busack et al. 1997; Pearsons and Hopley 1999). Furthermore, the success of a supplementation program may be limited by strong

  3. Spring Chinook Salmon Interactions Indices and Residual/Precocial Monitoring in the Upper Yakima Basin; Yakima/Klickitat Fisheries Project Monitoring and Evaluation Report 5 of 7, 2003-2004 Annual Report.

    SciTech Connect

    Pearsons, Todd N.; Johnson, Christopher L.; James, Brenda B.

    2004-05-01

    This report examines some of the factors that can influence the success of supplementation, which is currently being tested in the Yakima Basin using upper Yakima stock of spring chinook salmon. Supplementation success in the Yakima Basin is defined relative to four topic areas: natural production, genetics, ecological interactions, and harvest (Busack et al. 1997). The success of spring chinook salmon supplementation in the Yakima Basin is dependent, in part, upon fish culture practices and favorable physical and biological conditions in the natural environment (Busack et al. 1997; James et al. 1999; Pearsons et al., 2003). Shortfalls in either of these two topics (i.e., failure in culturing many fish that have high long-term fitness or environmental conditions that constrain spring chinook salmon production) will cause supplementation success to be limited. For example, inadvertent selection or propagation of spring chinook that residualize or precocially mature may hinder supplementation success. Spring chinook salmon that residualize (do not migrate during the normal migration period) may have lower survival rates than migrants and, additionally, may interact with wild fish and cause unacceptable impacts to non-target taxa. Large numbers of precocials (nonanadromous spawners) may increase competition for females and significantly skew ratios of offspring sired by nonanadromous males, which could result in more nonanadromous spring chinook in future generations. Conditions in the natural environment may also limit the success of spring chinook supplementation. For example, intra or interspecific competition may constrain spring chinook salmon production. Spring chinook salmon juveniles may compete with each other for food or space or compete with other species that have similar ecological requirements. Monitoring of spring chinook salmon residuals, precocials, prey abundance, carrying capacity, and competition will help researchers interpret why supplementation

  4. Evaluation of implement monitoring systems.

    PubMed

    Rakhra, A K; Mann, D D

    2013-01-01

    During monitoring of rear-mounted equipment, frequent rearward turning of tractor drivers causes awkward postures that can cause musculoskeletal disorders related to the back, neck, and shoulders. The objective of this study was to compare three implement monitoring strategies (direct viewing via physical turning, indirect viewing via rear-view mirrors, and indirect viewing via a camera-monitor system) in a lab environment using a tractor and air seeder driving simulator Comparison was based on monitoring performance of the operator (i.e., response error), physical impact on the operator (i.e., head/neck acceleration and increase in neck muscle temperature), and operator preference. Indirect viewing via a camera-monitor system caused the least physical impact on subjects and was the preferred implement monitoring strategy. No significant differences (alpha = 0.05) in monitoring performance were observed. PMID:23600169

  5. Evaluation of a cotton stripper yield monitor

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The objective of this work was to evaluate the accuracy of a microwave sensor based yield monitor for measuring yield on a cotton stripper harvester and determine if the yield monitor can discriminate differences in yield to the same level as a reference scale system. A new yield monitor was instal...

  6. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation Report 1 of 7, 2003-2004 Annual Report.

    SciTech Connect

    Busack, Craig A.; Frye, Alice; Kassler, Todd

    2004-05-01

    Genetic work for 2003, as in previous years, was quite diverse. In chapter 1 we report on the use of DNA microsatellite markers to sex spring chinook collected at Roza. We have learned through comparison of sex determinations at Roza and then at CESRF that sexing green fish on the basis of morphology is somewhat inaccurate, and accurate sexing of fish at Roza is needed to estimate sex ratios of fish on the spawning grounds. Using DNA microsatellite markers, sexing accuracy was high, but not perfect. In chapter 2 we report on new genetic risk concepts currently being developed and their implications for the YKFP spring chinook program. The impact on domestication of gene flow between the natural and hatchery spawning components is now much better understood. It is now possible to compare the risk of different hatchery programs much more quantitatively in the past. Thus, we can now make good predictions of how much less domesticating the Yakima spring chinook supplementation effort is than other programs. In chapter 3 we present the initial results of morphological comparisons of adult (1) hatchery-origin Upper Yakima spring chinook, (2) natural-origin U. Yakima spring chinook, and (3) Naches spring chinook. Canonical variate analysis allowed both sexes of the three groups to be classified correctly with over accuracy. The differences are subtle, but hatchery-origin fish appear to be someone thinner than natural-origin fish. This is consistent with observations of hatchery vs wild morphology in coho. In chapter 4 we describe the ongoing work to refine the Domestication Research/Monitoring Plan. Work for last year included analysis of the impact of HC line precocious males spawning in the wild, development of a misting incubation system for off-site incubation of Naches eggs, and refinement of some aspects of experimental design. The misting incubation system has broad applicability outside the project. The most recent version of the domestication monitoring plan is

  7. Pathogen Screening of Naturally Produced Yakima River Spring Chinook Smolts; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2002 Annual Report.

    SciTech Connect

    Thomas, Joan B.

    2003-05-01

    In 1999 the Cle Elem Hatchery began releasing spring chinook smolts into the upper Yakima River for restoration and supplementation. This project was designed to evaluate whether introduction of intensively reared hatchery produced smolts would impact the prevalence of specific pathogens in the naturally produced spring chinook smolts. Increases in prevalence of any of these pathogens could negatively impact the survival of these fish. Approximately 200 smolts were collected at the Chandler smolt collection facility on the lower Yakima River during 1998, 2000 and 2001 and 130 smolts were collected in 2002 for monitoring for specific pathogens. The pathogens monitored were infectious hematopoeitic necrosis virus, infectious pancreatic necrosis virus, viral hemorrhagic septicemia, Flavobacterium psychrophilum, Flavobacterium columnare, Aeromonas salmonicida, Yersinia ruckeri, Edwardsiella ictaluri, Renibacterium salmoninarum and Myxobolus cerebralis. In addition the fish were tested for Ceratomyxa shasta spores in 2000 and 2001 (a correction from the 2001 report). To date, the only changes have been in the levels the bacterial pathogens in the naturally produced smolts and they have been minimal. These changes are attributed to normal fluctuation of prevalence.

  8. 1990 Weatherization Assistance Program monitoring. Final report

    SciTech Connect

    Samuels, L.S.

    1992-06-19

    The fiscal year 1990 DOE weatherization programs were monitored in Indiana, Ohio, and Wisconsin. The focus of the monitoring was on a total of 18 subgrantees. Separate reports on the monitoring completed on each site was submitted as well as the final summary report for each state. The scope of monitoring consisted of a review of current contracts, budgets, program operating procedures, staffing, inventory control, financial and procurement procedures, review of client files and audit reports, inspection of completed dwelling units and assessment of monitoring, training, and technical assistance provided by the grantees. A random sampling of completed units were selected and visits were made to inspect these weatherized dwellings.

  9. Hood River and Pelton Ladder Monitoring and Evaluation Project and Hood River Fish Habitat Project : Annual Progress Report 1999-2000.

    SciTech Connect

    Lambert, Michael B.; McCanna, Joseph P.; Jennings, Mick

    2001-02-01

    The Hood River subbasin is home to four species of anadromous salmonids: chinook salmon (Oncorhynchus tshawytscha), coho salmon (Oncorhynchus kisutch), steelhead (Oncorhynchus mykiss), and sea run cutthroat trout (Salmo clarki). Indigenous spring chinook salmon were extirpated during the late 1960's. The naturally spawning spring chinook salmon currently present in the subbasin are progeny of Deschutes stock. Historically, the Hood River subbasin hatchery steelhead program utilized out-of-basin stocks for many years. Indigenous stocks of summer and winter steelhead were listed in March 1998 by National Marine Fisheries Service (NMFS) under the Endangered Species Act (ESA) as a ''Threatened'' Species along with similar genetically similar steelhead in the Lower Columbia Basin. This annual report summarizes work for two consecutive contract periods: the fiscal year (FY) 1999 contract period was 1 October, 1998 through 30 September, 1999 and 1 October, 1999 through 30 September, 2000 for FY 2000. Work implemented during FY 1999 and FY 2000 included (1) acclimation of hatchery spring chinook salmon and hatchery summer and winter steelhead smolts, (2) spring chinook salmon spawning ground surveys on the West Fork Hood River (3) genetic analysis of steelhead and cutthroat [contractual service with the ODFW], (4) Hood River water temperature studies, (5) Oak Springs Hatchery (OSH) and Round Butte Hatchery (RBH) coded-wire tagging and clipping evaluation, (6) preparation of the Hood River Watershed Assessment (Coccoli et al., December 1999) and the Fish Habitat Protection, Restoration, and Monitoring Plan (Coccoli et al., February 2000), (7) project implementation of early action habitat protection and restoration projects, (8) Pelton Ladder evaluation studies, (9) management oversight and guidance to BPA and ODFW engineering on HRPP facilities, and (10) preparation of an annual report summarizing project objectives for FY 1999 and FY 2000.

  10. Augmented Fish Monitoring, 1988 Annual Report.

    SciTech Connect

    Michak, Patty

    1989-05-01

    Since 1986 Washington department of Fisheries (WDF) has participated in the Columbia Basin Augmented Fish Health Monitoring Project. This project provides a standardized level of fish health information from all Agencies rearing fish in the Columbia Basin. WDF has actively participated in this project, and completed its second year of fish health monitoring, data collection and pathogen inspection during 1988. This report will present data collected from January 1, 1988 to December 31, 1988 and will compare sampling results from 1987 and 1988. The analysis will be divided in two sections: adult analysis and juvenile analysis. The adult analysis will include results from screening at spawning for viral pathogens and bacterial kidney disease (BKD), and evaluation of causes of pre-spawning loss. The juvenile analysis will include pre-release examination results, mid-term rearing exam results and evaluation of the Organosomatic Analysis completed on index stocks. Additionally, highlights from monthly monitoring exams will identify any significant and unusual findings from the routine exams completed in 1988. 6 refs., 8 figs., 14 tabs.

  11. Hood River Production Program Monitoring and Evaluation (M&E) - Confederated Tribes of Warm Springs : Annual Report For Fiscal Year, October 2007 – September 2008.

    SciTech Connect

    Gerstenberger, Ryan

    2009-07-27

    This progress report describes work performed by the Confederated Tribes of Warm Springs (CTWSRO) portion of the Hood River Production Program Monitoring and Evaluation Project (HRPP) during the 2008 fiscal year. A total of 64,736 hatchery winter steelhead, 12,108 hatchery summer steelhead, and 68,426 hatchery spring Chinook salmon smolts were acclimated and released in the Hood River basin during the spring. The HRPP exceeded program goals for a release of and 50,000 winter steelhead but fell short of the steelhead release goals of 30,000 summer steelhead and 75,000 spring Chinook in 2008. Passive Integrated Transponders (PIT) tags were implanted in 6,652 hatchery winter steelhead, and 1,196 hatchery summer steelhead, to compare migratory attributes and survival rates of hatchery fish released into the Hood River. Water temperatures were recorded at six locations within the Hood River subbasin to monitor for compliance with Oregon Department of Environmental Quality water quality standards. A preseason spring Chinook salmon adult run forecast was generated, which predicted an abundant return adequate to meet escapement goal and brood stock needs. As a result the tribal and sport fisheries were opened. A tribal creel was conducted from May 22 to July 18 during which an estimated 172 spring Chinook were harvested. One hundred sixteen Spring Chinook salmon redds were observed and 72 carcasses were inspected on 19.4 miles of spawning grounds throughout the Hood River Basin during 2008. Annual salvage operations were completed in two irrigation canals resulting in the liberation of 1,641 fish back to the Hood River.

  12. The monitoring, evaluation, reporting, and verification of climate change mitigation projects: Discussion of issues and methodologies and review of existing protocols and guidelines

    SciTech Connect

    Vine, E.; Sathaye, J.

    1997-12-01

    Because of concerns with the growing threat of global climate change from increasing emissions of greenhouse gases, the US and other countries are implementing, by themselves or in cooperation with one or more other nations (i.e., joint implementation), climate change mitigation projects. These projects will reduce greenhouse gas (GHG) emissions or sequester carbon, and will also result in non-GHG impacts (i.e., environmental, economic, and social impacts). Monitoring, evaluating, reporting, and verifying (MERV) guidelines are needed for these projects in order to accurately determine their net GHG, and other, benefits. Implementation of MERV guidelines is also intended to: (1) increase the reliability of data for estimating GHG benefits; (2) provide real-time data so that mid-course corrections can be made; (3) introduce consistency and transparency across project types and reporters; and (4) enhance the credibility of the projects with stakeholders. In this paper, the authors review the issues and methodologies involved in MERV activities. In addition, they review protocols and guidelines that have been developed for MERV of GHG emissions in the energy and non-energy sectors by governments, nongovernmental organizations, and international agencies. They comment on their relevance and completeness, and identify several topics that future protocols and guidelines need to address, such as (1) establishing a credible baseline; (2) accounting for impacts outside project boundaries through leakage; (3) net GHG reductions and other impacts; (4) precision of measurement; (5) MERV frequency; (6) persistence (sustainability) of savings, emissions reduction, and carbon sequestration; (7) reporting by multiple project participants; (8) verification of GHG reduction credits; (9) uncertainty and risk; (10) institutional capacity in conducting MERV; and (11) the cost of MERV.

  13. ECOLOGICAL MONITORING AND COMPLIANCE PROGRAM CALENDAR YEAR 2005 REPORT

    SciTech Connect

    BECHTEL NEVADA ECOLOGICAL SERVICES

    2006-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by Bechtel Nevada (BN) during the Calendar Year 2005. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive and protected/regulated species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Non-Proliferation Test and Evaluation Complex (NPTEC).

  14. Consultation on the Monitoring and Evaluation of AIDS Education/Health Promotion Programmes (Copenhagen, Denmark, May 2-4, 1990). Summary Report.

    ERIC Educational Resources Information Center

    World Health Organization, Copenhagen (Denmark). Regional Office for Europe.

    Thirteen participants from 11 countries, including experts in public health, health education, social sciences, epidemiology, planning, policy-making, and program management, took part in a consultation on the monitoring and evaluation of Acquired Immune Deficiency Syndrome (AIDS) education and health promotion programs in Copenhagen. A…

  15. Development and Initial Evaluation of a Web-Based Program to Increase Parental Awareness and Monitoring of Underage Alcohol Use: A Brief Report

    ERIC Educational Resources Information Center

    Brown, Pamela C.; Dunn, Michael E.; Budney, Alan J.

    2014-01-01

    The development of a Web-based parent-focused intervention to improve parental awareness and monitoring of adolescent alcohol use was preliminarily evaluated. Upon completion of baseline assessment, 67 parents were randomly assigned to the experimental Web-based parent-focused intervention or an assessment-only control condition. Participants who…

  16. Monitoring and Evaluation of Supplemented Spring Chinook Salmon and Life Histories of Wild Summer Steelhead in the Grande Ronde Basin, 2007 Annual Report.

    SciTech Connect

    Boe, Stephen J.; Crump, Carrie A.; Weldert, Rey L.

    2009-04-10

    This is the ninth annual report for a multi-year project designed to monitor and evaluate supplementation of endemic spring Chinook salmon in Catherine Creek and the upper Grande Ronde River. These two streams historically supported anadromous fish populations that provided significant tribal and non-tribal fisheries, but in recent years, have experienced severe declines in abundance. Conventional and captive broodstock supplementation methods are being used to restore these spring Chinook salmon populations. Spring Chinook salmon populations in Catherine Creek and the upper Grande Ronde River, and other streams in the Snake River Basin have experienced severe declines in abundance over the past two decades (Nehlsen et al. 1991). A supplementation program was initiated in Catherine Creek and the upper Grande Ronde River, incorporating the use of both captive and conventional broodstock methods, in order to prevent extinction in the short term and eventually rebuild populations. The captive broodstock component of the program (BPA Project 199801001) uses natural-origin parr collected by seining and reared to maturity at facilities near Seattle, Washington (Manchester Marine Laboratory) and Hood River, Oregon (Bonneville Hatchery). Spawning occurs at Bonneville Hatchery, and resulting progeny are reared in hatcheries. Shortly before outmigration in the spring, juveniles are transferred to acclimation facilities. After an acclimation period of about 2-4 weeks, volitional release begins. Any juveniles remaining after the volitional release period are forced out. The conventional broodstock component uses returning adults collected at traps near the spawning areas, transported to Lookingglass Hatchery near Elgin, Oregon, held, and later spawned. The resulting progeny are reared, acclimated, and released similar to the captive broodstock component. All progeny released receive one or more marks including a fin (adipose) clip, codedwire tag, PIT tag, or visual implant

  17. CAPSTONE REPORT ON THE APPLICATION, MONITORING, AND PERFORMANCE OF PERMEABLE REACTIVE BARRIERS FOR GROUND-WATER REMEDIATION: VOL. 1 PERFORMANCE EVALUATIONS AT TWO SITES

    EPA Science Inventory

    The purpose of this document is to provide detailed performance monitoring data on full-scale Permeable Reactive Barriers (PRBs) installed to treat contaminated ground water at two different sites. This report will fill a need for a readily available source of information for si...

  18. Augmented Fish Health Monitoring, 1992 Annual Report.

    SciTech Connect

    Warren, James W.

    1992-08-01

    , evaluate and monitor hatchery water supplies, improve communications and coordination, and provide a mechanism for periodic review. The contract with the U. S. Fish and Wildlife Service was approved on May 31, 1987, the last of the five inter-agency agreements to be signed. This did not delay Service participation with the other agencies because the Service already had many elements of the Project in place under its existing Service-wide fish health policy and implementation plan, The Service fully participated in the Project from mid-1987 through mid-1992. This completion report describes some of the many accomplishments under each of the objectives, benefits accruing from the Project, elements to be sustained by the Service after the Project ended, and Project that were not completed or that pointed out new work that needs to be done.

  19. Training evaluation final report

    NASA Technical Reports Server (NTRS)

    Sepulveda, Jose A.

    1992-01-01

    In the area of management training, 'evaluation' refers both to the specific evaluation instrument used to determine whether a training effort was considered effective, and to the procedures followed to evaluate specific training requests. This report recommends to evaluate new training requests in the same way new procurement or new projects are evaluated. This includes examining training requests from the perspective of KSC goals and objectives, and determining expected ROI of proposed training program (does training result in improved productivity, through savings of time, improved outputs, and/or personnel reduction?). To determine whether a specific training course is effective, a statement of what constitutes 'good performance' is required. The user (NOT the Training Branch) must define what is 'required level of performance'. This 'model' will be the basis for the design and development of an objective, performance-based, training evaluation instrument.

  20. HOV lane performance monitoring, 1998 annual report. Research report

    SciTech Connect

    Brown, W.W.; Nee, J.; Ishimaru, J.; Hallenbeck, M.E.

    1999-08-01

    This report describes the results of an extensive monitoring effort of HOV lane use and performance in the Puget Sound area in 1998. It presents an analysis of data collected to describe the number of people and vehicles that use those lanes, the reliability of the HOV lanes, travel time savings in comparison to general purpose lanes, violation rates, and public perceptions. This information is intended to serve as reliable input for transportation decision makers and planners in evaluating the impact and adequacy of the existing HOV lane system in the Puget Sound area and in planning for other HOV facilities.

  1. April 2008 monitoring report for Morrill, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2008-11-04

    In September 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) initiated periodic sampling of groundwater in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Morrill, Kansas. The sampling at Morrill is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE), to monitor levels of carbon tetrachloride contamination identified in the groundwater at this site (Argonne 2004, 2005a). This report provides results for the most recent monitoring event, in April 2008. Under the KDHE-approved monitoring plan (Argonne 2005b), groundwater was initially sampled twice yearly for a recommended period of two years (in fall 2005, in spring and fall 2006, and in spring and fall 2007). The samples were analyzed for volatile organic compounds (VOCs), as well as for selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. During the recommended two-year period, the originally approved scope of the monitoring was expanded to include vegetation sampling (initiated in October 2006) and surface water and stream bed sediment sampling (initiated in March 2007, after a visual reconnaissance along Terrapin Creek [Argonne 2007a]). The analytical results for groundwater sampling events at Morrill in September 2005, March 2006, September 2006, March 2007, and October 2007 were documented previously (Argonne 2006a,b, 2007b, 2008). Those results consistently demonstrated the presence of carbon tetrachloride contamination, at levels exceeding the KDHE Tier 2 risk-based screening level (5.0 {micro}g/L) for this compound, in a groundwater plume extending generally south-southeastward from the former CCC/USDA facility, toward Terrapin Creek at the south edge of the town. The results of those five monitoring

  2. Augmented Fish Health Monitoring, 1989 Annual Report.

    SciTech Connect

    Michak, Patty

    1990-05-01

    Since 1986 Washington Department of Fisheries (WDF) has participated in the Columbia Basin Augmented Fish Health Monitoring Project, funded by Bonneville Power Administration (BPA). This interagency project was developed to provide a standardized level of fish health information from all Agencies rearing fish in the Columbia Basin. Agencies involved in the project are: WDF, Washington Department of Wildlife, Oregon Fish and Wildlife, Idaho Fish and Game, and the US Fish and Wildlife Service. WDF has actively participated in this project, and completed its third year of fish health monitoring, data collection and pathogen inspection during 1989. This report will present data collected from January 1, 1989 to December 31, 1989 and will compare sampling results from screening at spawning for viral pathogens and bacterial kidney disease (BKD), and evaluation of causes of pre-spawning loss. The juvenile analysis will include pre-release examination results, mid-term rearing exam results and evaluation of the Organosomatic Analysis completed on stocks. 2 refs., 4 figs., 15 tabs.

  3. Ecological Monitoring and Compliance Program 2006 Report

    SciTech Connect

    David C. Anderson; Paul D. Greger; Derek B. Hall; Dennis J. Hansen; William K. Ostler

    2007-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows were

  4. Ecological Monitoring and Compliance Program 2006 Report

    SciTech Connect

    David C. Anderson; Paul D. Greger; Derek B. Hall; Dennis J. Hansen; William K. Ostler

    2007-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows were

  5. A Genetic Monitoring and Evaluation Program for Supplemented Populations of Salmon and Steelhead in the Snake River Basin : 1992 Annual Report.

    SciTech Connect

    Waples, Robin S.

    1993-07-01

    This is the second report of research for an ongoing study to evaluate the genetic effects of using hatchery-reared fish to supplement natural populations of chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss) in the Snake River Basin. The study plan involves yearly monitoring of genetic and meristic characteristics in hatchery, natural (supplemented), and wild (unsupplemented) populations in four different drainages for each species. This report summarizes the first two years of electrophoretic data for chinook salmon and steelhead and the first two years of meristic data for chinook salmon. Results obtained to date include the following: (1) Genetic variation was detected at 35 gene loci in chinook salmon and 50 gene loci in steelhead, both considerable increases over the number of polymorphic loci reported previously for Snake River populations. No substantial differences in levels of genetic variability were observed between years or between hatchery and natural/wild populations in either species. (2) In both species, statistically significant differences in allele frequency were typically found between years within populations. However, the temporal changes within populations were generally smaller than differences between populations. (3) Differences between chinook salmon populations classified as spring-and summer-run accounted for little of the overall genetic diversity; in contrast, substantial genetic differences were observed between ''B'' run steelhead from Dworshak Hatchery and ''A'' run populations from other study sites. (4) Estimates of the effective number of breeders per year (N,) derived from genetic data suggest that N{sub b} in natural and wild Snake River spring/summer chinook salmon populations is generally about one-quarter to three-quarters of the estimated number of adult spawners. (5) Analysis of the effects on data quality of sampling juveniles indicates that the small size of some wild fish may lead to a slight increase

  6. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation Report 3 of 7, 2003-2004 Annual Report.

    SciTech Connect

    Knudsen, Curtis

    2004-05-01

    This is the third in a series of annual reports that address reproductive ecological research and comparisons of hatchery and wild origin spring chinook in the Yakima River basin. Data have been collected prior to supplementation to characterize the baseline reproductive ecology, demographics and phenotypic traits of the unsupplemented upper Yakima population, however this report focuses on data collected on hatchery and wild spring chinook returning in 2003; the third year of hatchery adult returns. This report is organized into three chapters, with a general introduction preceding the first chapter and summarizes data collected between April 1, 2003 and March 31, 2004 in the Yakima basin. Summaries of each of the chapters in this report are included below. A major component of determining supplementation success in the Yakima Klickitat Fishery Project's spring chinook (Oncorhynchus tshawytscha) program is an increase in natural production. Within this context, comparing upper Yakima River hatchery and wild origin fish across traits such as sex ratio, age composition, size-at-age, fecundity, run timing and gamete quality is important because these traits directly affect population productivity and individual fish fitness which determine a population's productivity.

  7. Genetic Monitoring and Evaluation Program for Supplemented Populations of Salmon and Steelhead in the Snake River Basin, 1990-1991 Annual Report.

    SciTech Connect

    Waples, Robin S.; Teel, David J.; Aebersold, Paul B.

    1991-08-01

    This is the first report of research for an ongoing study to evaluate the genetic effects of using hatchery-reared fish to supplement natural populations of chinook salmon and steelhead in the Snake River Basin.

  8. Y-12 Groundwater Protection Program Calendar Year 2000 Groundwater Monitoring Data Evaluation Report for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect

    2001-09-01

    This report presents an evaluation of the groundwater and surface water monitoring data obtained during calendar year (CY) 2000 from sampling locations in the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Chestnut Ridge Regime encompasses several hazardous and nonhazardous waste management facilities associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) southeast of Oak Ridge, Tennessee (Figure A.1). Prepared by the Y-12 Groundwater Protection Program (GWPP), this monitoring data evaluation report addresses applicable provisions of DOE Order 5400.1 -- General Environmental Protection Program -- that require: (1) an evaluation of the quantity and quality of groundwater in areas that are, or could be, impacted by Y-12 operations, (2) an evaluation of the quality of surface water and groundwater where contaminants from Y-12 facilities are most likely to migrate beyond the DOE Oak Ridge Reservation (ORR) property line, and (3) an evaluation of long-term trends in groundwater quality at Y-12. The following sections of this report contain relevant background information (Section 2.0); describe the results of the respective data evaluations required under DOE Order 5400.1 (Section 3.0); summarize significant findings of each evaluation (Section 4.0); and list the technical reports and regulatory documents cited for more detailed information (Section 5.0). Illustrations (maps and trend graphs) and data summary tables referenced in each section are presented in Appendix A and Appendix B, respectively.

  9. Effects of Domestication on Predation Mortality and Competitive Dominance; Yakima/Klickitat Fisheries Project Monitoring and Evaluation Report 2 of 7, 2003-2004 Annual Report.

    SciTech Connect

    Pearsons, Todd N.; Fritts, Anthony L.; Scott, Jennifer L.

    2004-05-01

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from the Washington Department of Fish and Wildlife (WDFW) to the Bonneville Power Administration (BPA), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning, and (2) summarize results of research that have broader scientific relevance. This is the first of a series of progress reports that address the effects of hatchery domestication on predation mortality and competitive dominance in the upper Yakima River basin. This progress report summarizes data collected between January 1, 2003 and December 31, 2003. Raising fish in hatcheries can cause unintended behavioral, physiological, or morphological changes in chinook salmon due to domestication selection. Domestication selection is defined by Busack and Currens 1995 as, ''changes in quantity, variety, or combination of alleles within a captive population or between a captive population and its source population in the wild as a result of selection in an artificial environment''. Selection in artificial environments could be due to intentional or artificial selection, biased sampling during some stage of culture, or unintentional selection (Busack and Currens 1995). Genetic changes can result in lowered survival in the natural environment (Reisenbichler and Rubin 1999). The goal of supplementation or conservation hatcheries is to produce fish that will integrate into natural populations. Conservation hatcheries attempt to minimize intentional or biased sampling so that the hatchery fish are similar to naturally produced fish. However, the selective pressures in hatcheries are dramatically different than in the wild, which can result in genetic differences between hatchery and wild fish. The selective pressures may be particularly prominent during the freshwater rearing stage where most mortality of wild fish occurs. The Yakima Fisheries Project is studying

  10. Evaluation of groundwater monitoring at offsite nuclear test areas

    SciTech Connect

    Chapman, J.B.; Hokett, S.L.

    1991-03-01

    Groundwater quality has been monitored at nuclear test sites distant from the Nevada Test Site as part of the Long-Term Hydrologic Monitoring Program (LTHMP) since 1972. Separate reports describing the monitoring programs recommended by the US Department of Energy (DOE) Hydrologic Program Advisory Group were issued by the DOE for most of the offsite areas during the early 1980s, and the analytical results from the LTHMP have been regularly reported by the US Environmental Protection Agency (EPA), but there has been little else published about the program. The LTHMP has continued to demonstrate the safety of drinking water supplies near the offsite areas and there have been very few modifications to the program initially mandated by the DOE in 1972. During this time, however, there have been many changes in the fields of hydrogeology and environmental monitoring. In 1988, the DOE requested the Desert Research Institute to perform a critical review of the LTHMP in light of the many technical and regulatory advances in groundwater monitoring in recent years. This report presents an evaluation of the offsite groundwater monitoring program and evaluations specific to the monitoring networks at each of the eight offsite test areas. Discussion of the overall program is presented first, followed by site-specific recommendations. References follow each section for the convenience of readers interested in particular sites. 63 refs., 27 figs., 1 tab.

  11. Quarterly seismic monitoring report 96B

    SciTech Connect

    Reidel, S.P.

    1996-06-12

    This report summarizes the location, magnitude, and other pertinent information on earthquakes recorded on and near the Hanford Site by Westinghouse Seismic Monitoring during the period encompassing January 1, 1996 to March 31, 1996.

  12. Augmented Fish Health Monitoring; Volume I of II, Completion Report.

    SciTech Connect

    Michak, Patty

    1991-05-01

    The Bonneville Power Administration (BPA) initiated the Augmented Fish Health Monitoring project in 1986. This project was a five year interagency project involving fish rearing agencies in the Columbia Basin. Historically, all agencies involved with fish health in the Columbia Basin were conducting various levels of fish health monitoring, pathogen screening and collection. The goals of this project were; to identify, develop and implement a standardized level of fish health methodologies, develop a common data collection and reporting format in the area of artificial production, evaluate and monitor water quality, improve communications between agencies and provide annual evaluation of fish health information for production of healthier smolts. This completion report will contain a project evaluation, review of the goals of the project, evaluation of the specific fish health analyses, an overview of highlights of the project and concluding remarks. 8 refs., 1 fig., 4 tabs.

  13. Delaware Basin Monitoring Annual Report

    SciTech Connect

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2001-09-28

    The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. EPA requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard and must consider inadvertent drilling into the repository at some future time.

  14. Heat exchanger performance monitoring guidelines. Final report

    SciTech Connect

    Stambaugh, N.; Closser, W. Jr.; Mollerus, F.J.

    1991-12-01

    Fouling can occur in many heat exchanger applications in a way that impedes heat transfer and fluid flow and reduces the heat transfer or performance capability of the heat exchanger. Fouling may be significant for heat exchanger surfaces and flow paths in contact with plant service water. This report presents guidelines for performance monitoring of heat exchangers subject to fouling. Guidelines include selection of heat exchangers to monitor based on system function, safety function and system configuration. Five monitoring methods are discussed: the heat transfer, temperature monitoring, temperature effectiveness, delta P and periodic maintenance methods. Guidelines are included for selecting the appropriate monitoring methods and for implementing the selected methods. The report also includes a bibliography, example calculations, and technical notes applicable to the heat transfer method.

  15. Geothermal progress monitor report No. 6

    SciTech Connect

    Not Available

    1982-06-01

    Geothermal Progress Monitor Report No. 6 presents a state-by-state summary of the status of geothermal leasing, exploration, and development in major physiographic regions where geothermal resource potential has been identified. Recent state-specific activities are reported at the end of each state status report, while recent activities of a more general nature are summarized briefly in Part II of the report. A list of recent publications of potential interest to the geothermal community and a directory of contributors to the geothermal progress monitoring system are also included.

  16. Ecological Monitoring and Compliance Program 2013 Report

    SciTech Connect

    Hall, Derek B.; Anderson, David C.; Greger, Paul D.

    2014-06-05

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2013. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2013, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

  17. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Monitoring and evaluation. 275.19 Section 275.19 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action §...

  18. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Monitoring and evaluation. 275.19 Section 275.19 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action §...

  19. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Monitoring and evaluation. 275.19 Section 275.19 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action §...

  20. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Monitoring and evaluation. 275.19 Section 275.19 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action §...

  1. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Monitoring and evaluation. 275.19 Section 275.19 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action §...

  2. Yakima/Klickitat Fisheries Project Monitoring and Evaluation, Final Report For the Performance Period May 1, 2008 through April 30, 2009.

    SciTech Connect

    Sampson, Melvin R.

    2009-07-30

    proceeding with the YKFP because of the added production and learning potential the project would provide. The YKFP is unique in having been designed to rigorously test the efficacy of hatchery supplementation. Given the current dire situation of many salmon and steelhead stocks, and the heavy reliance on artificial propagation as a recovery tool, YKFP monitoring results will have great region-wide significance. Supplementation is envisioned as a means to enhance and sustain the abundance of wild and naturally-spawning populations at levels exceeding the cumulative mortality burden imposed on those populations by habitat degradation and by natural cycles in environmental conditions. A supplementation hatchery is properly operated as an adjunct to the natural production system in a watershed. By fully integrating the hatchery with a naturally-producing population, high survival rates for the component of the population in the hatchery can raise the average abundance of the total population (hatchery component + naturally-producing component) to a level that compensates for the high mortalities imposed by human development activities and fully seeds the natural environment. The objectives of the YKFP are to: use Ecosystem Diagnosis and Treatment (EDT) and other modeling tools to facilitate planning for project activities, enhance existing stocks, re-introduce extirpated stocks, protect and restore habitat in the Yakima Subbasin, and operate using a scientifically rigorous process that will foster application of the knowledge gained about hatchery supplementation and habitat restoration throughout the Columbia River Basin. The YKFP is still in the early stages of evaluation, and as such the data and findings presented in this report should be considered preliminary until results are published in the peer-reviewed literature. The following is a brief summary of current YKFP activities by species.

  3. Delaware Basin Monitoring Annual Report

    SciTech Connect

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2005-09-30

    The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

  4. Delaware Basin Monitoring Annual Report

    SciTech Connect

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2004-09-30

    The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

  5. Delaware Basin Monitoring Annual Report

    SciTech Connect

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2003-09-30

    The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

  6. Delaware Basin Monitoring Annual Report

    SciTech Connect

    Washington Regulatory and Environmental Services

    1999-09-30

    The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

  7. Delaware Basin Monitoring Annual Report

    SciTech Connect

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2000-09-28

    The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

  8. Delaware Basin Monitoring Annual Report

    SciTech Connect

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2002-09-21

    The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

  9. Pathogen Screening of Naturally Produced Yakima River Spring Chinook Smolts; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2004-2005 Annual Report.

    SciTech Connect

    Thomas, Joan B.

    2005-05-01

    In the spring of 2004 naturally produced smolts outmigrating from the Yakima River Basin were collected for the sixth year of pathogen screening. This component of the evaluation is to monitor whether introduction of hatchery produced smolts would impact the prevalence of specific pathogens in the naturally produced spring chinook smolts. Increases in prevalence of any of these pathogens could negatively impact the survival of these fish. Since 1999 the Cle Elum Hatchery has been releasing spring chinook salmon smolts into the upper Yakima River to increase natural production. In 1998 and 2000 through 2004 naturally produced smolts were collected for monitoring at the Chandler smolt collection facility on the lower Yakima River. Smolts were collected from mid to late outmigration, with a target of 200 fish each year. The pathogens monitored were infectious hematopoeitic necrosis virus, infectious pancreatic necrosis virus, viral hemorrhagic septicemia virus, Flavobacterium psychrophilum, Flavobacterium columnare, Aeromonas salmonicida, Yersinia ruckeri, Edwardsiella ictaluri, Renibacterium salmoninarum and Myxobolus cerebralis. Of these pathogens, only R. salmoninarum was detected in very low levels in the naturally produced smolts outmigrating in 2004. To date, only bacterial pathogens have been detected and prevalences have been low. There have been small variations each year and these changes are attributed to normal fluctuations in prevalence. All of the pathogens detected are widely distributed in Washington State.

  10. Development and evaluation of a real-time pH and conductivity rain monitor. Final report for 1984-1986

    SciTech Connect

    Paur, R.J.

    1987-04-01

    Acidic wet deposition (acid rain) is thought to be responsible for a variety of deleterious effects on ecosystems and on natural and man-made materials. Determining and quantitating these effects is complicated by the fact that rain is a low-ionic-strength solution of many different salts and organic compounds. The report describes the features and performance of a monitor that was designed to fractionate a rain event into samples corresponding to 0.3 mm of rain, determine the pH and conductivity of the sample within approximately one minute of collection, and store the remainder of the sample for more-detailed analysis.

  11. Supplemental Report: Application of Emission Spectroscopy to Monitoring Technetium

    SciTech Connect

    Spencer, W.A.

    2000-07-27

    This report provides supplemental information to an earlier report BNF-98-003-0199, ''Evaluation of Emission Spectroscopy for the On-Line Analysis of Technetium''. In this report data is included from real Hanford samples as well as for solutions spiked with technetium. This supplemental work confirms the ability of ICP-ES to monitor technetium as it breaks through an ion exchange process.

  12. Spring Chinook Salmon Interactions Indices and Residual/Precocious Male Monitoring in the Upper Yakima Basin; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2004-2005 Annual Report.

    SciTech Connect

    Pearsons, Todd N.; Johnson, Christopher L.; James, Brenda B.

    2005-05-01

    This report examines some of the factors that can influence the success of supplementation, which is currently being tested in the Yakima Basin using upper Yakima stock of spring chinook salmon. Supplementation success in the Yakima Basin is defined relative to four topic areas: natural production, genetics, ecological interactions, and harvest (Busack et al. 1997). The success of spring chinook salmon supplementation in the Yakima Basin is dependent, in part, upon fish culture practices and favorable physical and biological conditions in the natural environment (Busack et al. 1997; James et al. 1999; Pearsons et al., 2003; Pearsons et al. 2004). Shortfalls in either of these two topics (i.e., failure in culturing many fish that have high long-term fitness or environmental conditions that constrain spring chinook salmon production) will cause supplementation success to be limited. For example, inadvertent selection or propagation of spring chinook that residualize or precocially mature may hinder supplementation success. Spring chinook salmon that residualize (do not migrate during the normal migration period) may have lower survival rates than migrants and, additionally, may interact with wild fish and cause unacceptable impacts to non-target taxa. Large numbers of precocials (nonanadromous spawners) may increase competition for females and significantly skew ratios of offspring sired by nonanadromous males, which could result in more nonanadromous spring chinook in future generations. Conditions in the natural environment may also limit the success of spring chinook supplementation. For example, intra or interspecific competition may constrain spring chinook salmon production. Spring chinook salmon juveniles may compete with each other for food or space or compete with other species that have similar ecological requirements. Monitoring of spring chinook salmon residuals, precocials, prey abundance, carrying capacity, and competition will help researchers

  13. Pathogen Screening of Naturally Produced Yakima River Spring Chinook Smolts; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2001 Annual Report.

    SciTech Connect

    Pearsons, Todd N.; Thomas, Joan B.

    2003-01-01

    The change in pathogens prevalence to wild fish is probably the least studied ecological interaction associated with hatchery operations. In 1999, the Cle Elum Hatchery began releasing spring chinook smolts into the upper Yakima River to increase natural production. Part of the evaluation of this program is to evaluate whether introduction of hatchery produced smolts would impact the prevalence of specific pathogens in the naturally produced spring chinook smolts. Increases in prevalence of any of these pathogens could negatively impact the survival of these fish. Approximately 200 smolts were collected at the Chandler smolt collection facility on the lower Yakima River during 1998, 2000 and 2001 and monitored for specific pathogens. The pathogens monitored were infectious hematopoeitic necrosis virus, infectious pancreatic necrosis virus, viral hemorrhagic septicemia, Flavobacterium psychrophilum, Flavobacterium columnare, Aeromonas salmonicida, Yersinia ruckeri, Edwardsiella ictaluri, Renibacterium salmoninarum and Myxobolus cerebralis. In addition, the fish were tested for Ceratomyxa shasta spores in 2001. Not all testing has been completed for every year, but to date, there have only been minimal changes in levels of the bacterial pathogens in the naturally produced smolts. At this point, due to the limited testing so far, these changes are attributed to normal fluctuation of prevalence.

  14. Groundwater Monitoring Report Generation Tools - 12005

    SciTech Connect

    Lopez, Natalie

    2012-07-01

    Compliance with National and State environmental regulations (e.g. Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) aka SuperFund) requires Savannah River Site (SRS) to extensively collect and report groundwater monitoring data, with potential fines for missed reporting deadlines. Several utilities have been developed at SRS to facilitate production of the regulatory reports which include maps, data tables, charts and statistics. Components of each report are generated in accordance with complex sets of regulatory requirements specific to each site monitored. SRS developed a relational database to incorporate the detailed reporting rules with the groundwater data, and created a set of automation tools to interface with the information and generate the report components. These process improvements enhanced quality and consistency by centralizing the information, and have reduced manpower and production time through automated efficiencies. (author)

  15. GROUNDWATER MONITORING REPORT GENERATION TOOLS - 12005

    SciTech Connect

    Lopez, N.

    2011-11-21

    Compliance with National and State environmental regulations (e.g. Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) aka SuperFund) requires Savannah River Site (SRS) to extensively collect and report groundwater monitoring data, with potential fines for missed reporting deadlines. Several utilities have been developed at SRS to facilitate production of the regulatory reports which include maps, data tables, charts and statistics. Components of each report are generated in accordance with complex sets of regulatory requirements specific to each site monitored. SRS developed a relational database to incorporate the detailed reporting rules with the groundwater data, and created a set of automation tools to interface with the information and generate the report components. These process improvements enhanced quality and consistency by centralizing the information, and have reduced manpower and production time through automated efficiencies.

  16. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2004-2005 Annual Report.

    SciTech Connect

    Knudsen, Curtis M.; Schroder, Steven L.; Johnston, Mark V.

    2005-05-01

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from Oncorh Consulting to the Washington Department of Fish and Wildlife (WDFW), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning and (2) summarize results of research that have broader scientific relevance. This is the fourth in a series of reports that address reproductive ecological research and monitoring of spring chinook populations in the Yakima River basin. This annual report summarizes data collected between April 1, 2004 and March 31, 2005 and includes analyses of historical baseline data, as well. Supplementation success in the Yakima Klickitat Fishery Project's (YKFP) spring chinook (Oncorhynchus tshawytscha) program is defined as increasing natural production and harvest opportunities, while keeping adverse ecological interactions and genetic impacts within acceptable bounds (Busack et al. 1997). Within this context demographics, phenotypic traits, and reproductive ecology have significance because they directly affect natural productivity. In addition, significant changes in locally adapted traits due to hatchery influence, i.e. domestication, would likely be maladaptive resulting in reduced population productivity and fitness (Taylor 1991; Hard 1995). Thus, there is a need to study demographic and phenotypic traits in the YKFP in order to understand hatchery and wild population productivity, reproductive ecology, and the effects of domestication (Busack et al. 1997). Tracking trends in these traits over time is also a critical aspect of domestication monitoring (Busack et al. 2004) to determine whether trait changes have a genetic component and, if so, are they within acceptable limits. The first chapter of this report compares first generation hatchery and wild upper Yakima River spring chinook returns over a suite of life-history, phenotypic and demographic traits. The second chapter

  17. ICCP Environmental Monitoring Report CY-1992

    SciTech Connect

    Neff, J.K.

    1993-07-01

    Summarized in this report are the data collected through Environmental Monitoring programs conducted at the Idaho Chemical Processing Plant (ICPP) by the Environmental Safety & Health (ES&H) Department. This report is published in response to DOE Order 5400.1. This report covers the period from December 21, 1991 through December 20, 1992 and details airborne and liquid effluents from the Chemical Processing Plant.

  18. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2001-2002 Annual Report.

    SciTech Connect

    Knudsen, Curtis M.

    2003-05-01

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from Oncorh Consulting to the Washington Department of Fish and Wildlife (WDFW), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning, and (2) summarize results of research that have broader scientific relevance. This is the second in a series of reports that address reproductive ecological research and monitoring of spring chinook in the Yakima River basin. In addition to within-year comparisons, between-year comparisons will be made to determine if traits of the wild Naches basin control population, the naturally spawning population in the upper Yakima River and the hatchery control population are diverging over time. This annual report summarizes data collected between April 1, 2002 and March 31, 2003. In the future, these data will be compared to previous years to identify general trends and make preliminary comparisons. Supplementation success in the Yakima Klickitat Fishery Project's (YKFP) spring chinook (Oncorhynchus tshawytscha) program is defined as increasing natural production and harvest opportunities, while keeping adverse ecological interactions and genetic impacts within acceptable bounds (Busack et al. 1997). Within this context demographics, phenotypic traits, and reproductive ecology have significance because they directly affect natural productivity. In addition, significant changes in locally adapted traits due to hatchery influence, i.e. domestication, would likely be maladaptive resulting in reduced population productivity and fitness (Taylor 1991; Hard 1995). Thus, there is a need to study demographic and phenotypic traits in the YKFP in order to understand hatchery and wild population productivity, reproductive ecology, and the effects of domestication (Busack et al. 1997). Tracking trends in these traits over time is also a critical aspect of domestication monitoring (Busack et al

  19. Evaluating the efficiency of environmental monitoring programs

    USGS Publications Warehouse

    Levine, Carrie R.; Yanai, Ruth D.; Lampman, Gregory G.; Burns, Douglas A.; Driscoll, Charles T.; Lawrence, Gregory B.; Lynch, Jason; Schoch, Nian

    2014-01-01

    Statistical uncertainty analyses can be used to improve the efficiency of environmental monitoring, allowing sampling designs to maximize information gained relative to resources required for data collection and analysis. In this paper, we illustrate four methods of data analysis appropriate to four types of environmental monitoring designs. To analyze a long-term record from a single site, we applied a general linear model to weekly stream chemistry data at Biscuit Brook, NY, to simulate the effects of reducing sampling effort and to evaluate statistical confidence in the detection of change over time. To illustrate a detectable difference analysis, we analyzed a one-time survey of mercury concentrations in loon tissues in lakes in the Adirondack Park, NY, demonstrating the effects of sampling intensity on statistical power and the selection of a resampling interval. To illustrate a bootstrapping method, we analyzed the plot-level sampling intensity of forest inventory at the Hubbard Brook Experimental Forest, NH, to quantify the sampling regime needed to achieve a desired confidence interval. Finally, to analyze time-series data from multiple sites, we assessed the number of lakes and the number of samples per year needed to monitor change over time in Adirondack lake chemistry using a repeated-measures mixed-effects model. Evaluations of time series and synoptic long-term monitoring data can help determine whether sampling should be re-allocated in space or time to optimize the use of financial and human resources.

  20. Evaluation of workplace air monitoring locations

    SciTech Connect

    Stoetzel, G.A.; Cicotte, G.R.; Lynch, T.P. ); Aldrich, L.K. )

    1991-10-01

    Current federal guidance on occupational radiation protection recognizes the importance of conducting air flow studies to assist in the placement of air sampling and monitoring equipment. In support of this, Pacific Northwest Laboratory has provided technical assistance to Westinghouse Hanford Company for the purpose of evaluating the adequacy of air sampling and monitoring locations at selected Hanford facilities. Qualitative air flow studies were performed using smoke aerosols to visually determine air movement. Three examples are provided of how air flow studies results, along with information on the purpose of the air sample being collected, were used as a guide in placing the air samplers and monitors. Preparatory steps in conducting an air flow study should include: (1) identifying type of work performed in the work area including any actual or potential release points; (2) determining the amounts of radioactive material available for release and its chemical and physical form; (3) obtaining accurate work area descriptions and diagrams; (4) identifying the location of existing air samplers and monitors; (5) documenting physical and ventilation configurations; (6) notifying appropriate staff of the test; and (7) obtaining necessary equipment and supplies. The primary steps in conducting an air flow study are measurements of air velocities in the work area, release of the smoke aerosol at selected locations in the work area and the observation of air flow patterns, and finally evaluation and documentation of the results. 2 refs., 3 figs.

  1. Evaluation of Monitoring Approaches for Natural Attenuation

    NASA Astrophysics Data System (ADS)

    Roll, L. L.; Labolle, E. M.; Fogg, G. E.

    2008-12-01

    Monitored natural attenuation (MNA) can be a useful alternative to active remediation, however, firm conclusions regarding effectiveness of MNA may be elusive because of multiple processes that can produce similar, apparent trends in chemical concentrations in the heterogeneous subsurface. Current monitoring approaches need to be critically evaluated for typical field settings, such as heterogeneous alluvial aquifer systems, because spatially varying aquifer properties create non uniform flow fields that greatly influence transport processes, producing complex plume behavior that may not be adequately depicted by monitoring networks. Highly-resolved simulations of flow and conservative transport in a typical alluvial aquifer system facilitate a critical review of three monitoring approaches including estimation of mass balance from sampling along the plume centerline, estimation of mass balance from fine grid sampling, and estimation of mass flux from sampling along cross sections. The simulation procedure involves generation of unconditional transition-probability fields of hydrofacies distributions, simulation of steady state flow followed by simulation of conservative transport using a highly accurate random walk particle method (RWHET). The results elucidate limitations and potential pitfalls of the monitoring methods and use of simple models in typically heterogeneous systems. For example, simulations show that because of the system complexity, apparent concentration trends in space and time can be falsely attributed to biodegradation when none is occurring if simplistic models are used to interpret the data. Measured concentrations alone are likely insufficient to judge effectiveness of MNA.

  2. Development and Evaluation of Sensor Concepts for Ageless Aerospace Vehicles: Report 6 - Development and Demonstration of a Self-Organizing Diagnostic System for Structural Health Monitoring

    NASA Technical Reports Server (NTRS)

    Batten, Adam; Edwards, Graeme; Gerasimov, Vadim; Hoschke, Nigel; Isaacs, Peter; Lewis, Chris; Moore, Richard; Oppolzer, Florien; Price, Don; Prokopenko, Mikhail; Scott, Andrew; Wang, Peter

    2010-01-01

    This report describes a significant advance in the capability of the CSIRO/NASA structural health monitoring Concept Demonstrator (CD). The main thrust of the work has been the development of a mobile robotic agent, and the hardware and software modifications and developments required to enable the demonstrator to operate as a single, self-organizing, multi-agent system. This single-robot system is seen as the forerunner of a system in which larger numbers of small robots perform inspection and repair tasks cooperatively, by self-organization. While the goal of demonstrating self-organized damage diagnosis was not fully achieved in the time available, much of the work required for the final element that enables the robot to point the video camera and transmit an image has been completed. A demonstration video of the CD and robotic systems operating will be made and forwarded to NASA.

  3. Consolidated Monitor and Review. Maxi II Report.

    ERIC Educational Resources Information Center

    Bispo, Edward L.

    This book describes a practicum project that developed instruments and procedures to aid staff members of the California State Department of Education in monitoring multiple educational programs. The instruments and procedures developed were used by staff members to analyze applicable federal and state regulations and evaluate program quality for…

  4. Reporters to monitor cellular MMP12 activity

    NASA Astrophysics Data System (ADS)

    Cobos-Correa, Amanda; Mall, Marcus A.; Schultz, Carsten

    2010-02-01

    Macrophage elastase, also called MMP12, belongs to a family of proteolytic enzymes whose best known physiological function is the remodeling of the extracellular matrix. Under certain pathological conditions, including inflammation, chronic overexpression of MMP12 has been observed and its elevated proteolytic activity has been suggested to be the cause of pulmonary emphysema. However, it was until recently impossible to monitor the activity of MMP12 under disease conditions, mainly due to a lack of detection methods. Recent development of new reporters for monitoring MMP12 activity in living cells, such as LaRee1, provided novel insights into the pathobiology of MMP12 in pulmonary inflammation.1 In the future, these reporters might contribute to improved diagnosis and in finding better treatments for chronic inflammatory lung diseases and emphysema. Our approach for visualizing MMP12 activity is based on peptidic, membrane-targeted FRET (Foerster Resonance Energy Transfer) reporters. Here we describe a set of new reporters containing different fluorophore pairs as well as modifications in the membrane-targeting lipid moiety. We studied the influence of these modifications on reporter performance and the reporter mobility on live cell membranes by FRAP (fluorescence recovery after photobleaching). Finally, we generated several new fluorescently labeled MMP inhibitors based on the peptidic reporter structures as prototypes for future tools to inhibit and monitor MMP activity at the same time.

  5. Ecological Monitoring and Compliance Program 2014 Report

    SciTech Connect

    Hall, Derek B.; Anderson, David C.; Greger, Paul D.; Ostler, W. Kent

    2015-05-12

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2014. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2014, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives. Sensitive and protected/regulated species of the NNSS include 42 plants, 1 mollusk, 2 reptiles, 236 birds, and 27 mammals. These species are protected, regulated, or considered sensitive according to state or federal regulations and natural resource agencies and organizations. The desert tortoise (Gopherus agassizii) and the western yellow-billed cuckoo (Coccyzus americanus) are the only species on the NNSS protected under the Endangered Species Act, both listed as threatened. However, only one record of the cuckoo has ever been documented on the NNSS, and there is no good habitat for this species on the NNSS. It is considered a rare migrant. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 18 projects. A total of 199.18 hectares (ha) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found during these surveys included a predator burrow, one sidewinder rattlesnake (Crotalus cerastes), two mating speckled rattlesnakes

  6. Characteristics of District Evaluation Reports.

    ERIC Educational Resources Information Center

    McGranahan, Pamela

    This study provides information about the actual functions and activities of school district evaluation units by examining an integral product of the units. This product, an evaluation report, was examined from a nationwide sample of district evaluation organizations (N=116). Reports were checked for the presence of particular evaluation report…

  7. Annual environmental monitoring report: calendar year 1981

    SciTech Connect

    Farmer, B.M.; Carfagno, D.G.

    1982-04-21

    The environment locally surrounding Mound was monitored primarily for tritium and plutonium-238. The results are reported for CY-1981. The environmental medium analyzed included air, water, vegetation, foodstuffs, and sediment. The average concentrations of plutonium-238 and tritium were within the applicable standards (adopted by the US DOE) for radioactive species.

  8. Administrative reports for monitoring pharmacy purchasing.

    PubMed

    Chin, R K

    1984-11-01

    The use of administrative reports in a hospital pharmacy department to monitor communication regarding drug supply problems and to assist pharmacy administration in assessing the performance of its purchasing area is described. The weekly drug supply problems report was developed as a method to communicate problems in the storeroom to other pharmacy areas. The weekly borrow and loan report, which accounts for all borrow and loan transactions, helps determine the proper reorder quantities of drug products borrowed frequently and monitors repayment for loaned items. The inventory assessment report is prepared annually; in this report, drug expenditures for a "market-basket" list of drug products are compared for the current and previous years. To assess the use of nonformulary drugs, a quarterly report of expenditures for nonformulary drugs is compiled. The purchasing pharmacist, who is responsible for inventory control, prepares these reports. When considered in relation to the budget and workload statistics, the reports can be used to assess the performance of the purchasing area. Increased accountability and more orderly operation of the purchasing area has accompanied the use of these reports. PMID:6507438

  9. Removing mystique of the monitoring report.

    PubMed

    Durbin, Jack

    2008-01-01

    This article provides a clearer understanding of how to use the monitoring report, a monthly statement of how the department is performing compared to the budget, to move the department forward. Critical items discussed in relation to the report include revenue, salaries, benefits, supplies, services, utilities, leases and rentals, and depreciation. Data in the report tells a story of what is happening in the department and it guides the reviewer to key areas in resolving discrepancies between what has been budgeted and what is actually occurring. PMID:18953983

  10. Uncertainty evaluation in BEACON power distribution monitoring

    SciTech Connect

    Morita, T.; Goldstein, N.P. )

    1989-11-01

    BEACON is an advanced operational core support package that has a three-dimensional nodal code as its cornerstone. The three-dimensional calculation includes all necessary pressurized water reactor feedback effects. The generation of the measured power distribution from the core instrumentation is one of the primary functions of the core-monitoring software. The purpose of this paper is to discuss evaluation of the uncertainty in the measured assembly power from the BEACON system. The study covers not only the normal operating conditions, but off-normal situations to demonstrate BEACON's applicability for that condition.

  11. Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 2002 Annual Report.

    SciTech Connect

    Rocklage, Stephen J.; Kellar, Dale S.

    2005-07-01

    The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam in 2002. This was the seventh year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 479,358 yearlings released from the Fall Chinook Acclimation Project facilities exceeded the 450,000 fish quota. We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 7,545 PIT tagged yearlings from Pittsburg Landing, 7,482 from Big Canyon and 2,487 from Captain John Rapids. Fish health sampling indicated that, overall, bacterial kidney disease levels at the acclimation facilities could be considered medium to high with 43-62% of fish sampled rating medium to very high. Mean fork lengths (95% confidence interval) of the PIT tagged groups ranged from 146.7 mm (146.2-147.2 mm) at Captain John Rapids to 164.8 mm (163.5-166.1 mm) at Lyons Ferry Hatchery. Mean condition factors ranged from 1.06 at Lyons Ferry Hatchery to 1.14 at Pittsburg Landing and Captain John Rapids. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 88.6% (86.0-91.1%) for Pittsburg Landing to 97.0% (92.4-101.7%) for Captain John Rapids. Estimated survival from release to McNary Dam ranged from 54.3% (50.2-58.3%) for Big Canyon to 70.5% (65.4-75.5%) for Pittsburg Landing. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 8.1 river kilometers per

  12. Project Quinte annual report, 1993. Monitoring report No. 5. Annual publication

    SciTech Connect

    1995-12-31

    This report reviews the activities of Project Quinte, a long-term multi-agency research and monitoring project whose objectives include studying, comparing, and evaluating the Bay of Quinte limnological attributes (biological, physical, and chemical) before and after phosphorus control was implemented at municipal sewage treatment plans. The project also monitors long-term ecosystem responses within the Bay. The report includes papers summarizing research on such topics as phosphorus loadings, hydrology and sediment monitoring, nutrients and phytoplankton, toxic contaminant modeling, benthic fauna, fish populations, and wastewater toxicity.

  13. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Management evaluation and monitoring reviews. 246.19... WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews. (a) Management evaluations and reviews. (1) FNS and each State agency shall establish a...

  14. 29 CFR 97.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reports shall be due 30 days after the reporting period. The final performance report will be due 90 days... 29 Labor 1 2011-07-01 2011-07-01 false Monitoring and reporting program performance. 97.40 Section... Enforcement § 97.40 Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees...

  15. 24 CFR 85.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... reports shall be due 30 days after the reporting period. The final performance report will be due 90 days... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Monitoring and reporting program..., Retention, and Enforcement § 85.40 Monitoring and reporting program performance. (a) Monitoring by...

  16. 7 CFR 3016.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... reports shall be due 30 days after the reporting period. The final performance report will be due 90 days... 7 Agriculture 15 2011-01-01 2011-01-01 false Monitoring and reporting program performance. 3016.40... Enforcement § 3016.40 Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees...

  17. Evaluation of a multiport groundwater monitoring system

    SciTech Connect

    Gilmore, T.J.; Hall, S.H.; Olsen, K.B.; Spane, F.A. Jr.

    1991-03-01

    In 1988 and 1989, Pacific Northwest Laboratory installed a multiport groundwater monitoring system in two wells on the Hanford Site: one near the 216-B-3 Pond in the center of the Hanford Site and one just north of the 300 Area near the Columbia River. The system was installed to provide the US Department of Energy with needed three-dimensional data on the vertical distribution of contaminants and hydraulic heads on the Hanford Site. This study evaluates the ability of the multiport system to obtain hydrogeologic data at multiple points vertically in a single borehole, and addresses the representativeness of the data. Data collected from the two wells indicate that the multiport system is well suited for groundwater monitoring networks requiring three-dimensional characterization of the hydrogeologic system. A network of these systems could provide valuable information on the hydrogeologic environment. However, the advantages of the multiport system diminish when the system is applied to long-term monitoring networks (30+ years) and to deeper wells (<300 ft). For shallow wells, the multiport system provides data in a cost-effective manner that would not be reasonably obtainable with the conventional methods currently in use at the Hanford Site. 17 refs., 28 figs., 6 tabs.

  18. Augmented Fish Health Monitoring; Volume II of II, Completion Report.

    SciTech Connect

    Michak, Patty

    1991-12-01

    The Bonneville Power Administration (BPA) initiated the Augmented Fish Health Monitoring project in 1986. This project was a five year interagency project involving fish rearing agencies in the Columbia Basin. Participating agencies included: Washington Department of Fisheries (WDF), Oregon Department of Fish and Wildlife, Idaho Department of Fish and Game, and the US Fish and Wildlife Service (USFWS). This is the final data report for the Augmented Fish Health Monitoring project. Data collected and sampling results for 1990 and 1991 are presented within this report. An evaluation of this project can be found in Augmented Fish Health Monitoring, Volume 1, Completion Report.'' May, 1991. Pathogen detection methods remained the same from methods described in Augmented Fish Health Monitoring, Annual Report 1989,'' May, 1990. From January 1, 1990 to June 30, 1991 fish health monitoring sampling was conducted. In 1990 21 returning adult stocks were sampled. Juvenile pre-release exams were completed on 20 yearling releases, and 13 sub-yearling releases in 1990. In 1991 17 yearling releases and 11 sub-yearling releases were examined. Midterm sampling was completed on 19 stocks in 1990. Organosomatic analysis was performed at release on index station stocks; Cowlitz spring and fall chinook, Lewis river early coho and Lyons Ferry fall chinook.

  19. The new ozone monitor. Final report

    SciTech Connect

    Karlson, E.L.

    1994-09-20

    This report describes the development of an invention for measuring the concentration of ozone by measuring the heat evolved when the ozone is catalyzed and converted back to oxygen. This ozone monitor evolved through a number of prototype as described in the final report. The final instrument is accurate, reliable and can be installed as a part of a control system. This instrument can be built and calibrated for any necessary specific ozone concentration range. This instrument uses inexpensive parts and would be simple to maintain. the manufacturing cost is less than any equally reliable and accurate ozone monitor presently available. The advantage this system has is that the ozone is directly measured as the temperature of the catalyst. It does not need UV lamps (which continually degrade in use and have a variable life) or use any chemistry where a material is continuously used up. This new ozone monitor directly measures the heat that is generated from the ozone as it converts back into oxygen as the gas mixture flows through the catalyst. The catalyst has theocratically an infinite life. It can clog if the system it is installed in, is dusty. But in systems that produce ozone, it is important that the gas is clean. Under normal clean gas conditions this instrument will give long term service free monitoring.

  20. ICPP environmental monitoring report CY-1994

    SciTech Connect

    1995-05-01

    Summarized in this report are the data collected through Environmental Monitoring programs conducted at the Idaho Chemical Processing Plant (ICPP) by the Environmental Protection Department. The ICPP is responsible for complying with all applicable Federal, State, Local and DOE Rules, Regulations and Orders. Radiological effluent and emissions are regulated by the DOE in accordance with the Derived Concentration Guides (DCGs) as presented in DOE Order 5400.5. The State of Idaho regulates nonradiological waste resulting from the ICPP operations including airborne, liquid, and solid waste. The Environmental Department updated the Quality Assurance (QA) Project Plan for Environmental Monitoring activities during the third quarter of 1992. QA activities have resulted in the ICPP`s implementation of the Environmental Protection Agency (EPA) rules and guidelines pertaining to the collection, analyses, and reporting of environmentally related samples. Where no EPA methods for analyses existed for radionuclides, LITCO methods were used.

  1. Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 2004 Annual Report.

    SciTech Connect

    Rocklage, Stephen J. Nez Perce Tribe, Department of Fisheries Resource Management, Lapawi, ID)

    2005-07-01

    The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project (FCAP) sites upstream of Lower Granite Dam in 2004. This was the ninth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 414,452 yearlings released from the Fall Chinook Acclimation Project facilities were short of the 450,000 fish quota. We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 4,983 PIT tagged yearlings from Pittsburg Landing, 4,984 from Big Canyon and 4,982 from Captain John Rapids. Fish health sampling indicated that, overall, bacterial kidney disease levels could be considered low with 53-94% rating not detected to low. Mean fork lengths (95% confidence interval) of the PIT tagged groups ranged from 154.6 mm (154.0-155.2 mm) at Pittsburg Landing to 163.0 mm (162.6-163.4 mm) at Captain John Rapids. Mean condition factors ranged from 1.06 at Lyons Ferry Hatchery to 1.16 at Big Canyon. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 74.7% (72.9-76.5%) for Big Canyon to 88.1% (85.7-90.6%) for Captain John Rapids. Estimated survival from release to McNary Dam ranged from 45.3% (39.2-51.5%) for Pittsburg Landing to 52.1% (42.9-61.2%) for Big Canyon. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 5.5 river kilometers per day (rkm/d) for Captain John Rapids to 12.8 rkm/d for Pittsburg Landing. Median migration

  2. Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 2001 Annual Report.

    SciTech Connect

    Rocklage, Stephen J.; Kellar, Dale S.

    2005-07-01

    The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 2001. This was the sixth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 318,932 yearlings released from the Fall Chinook Acclimation Project facilities were short of the 450,000 fish quota. We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 7,503 PIT tagged yearlings from Pittsburg Landing, 7,499 from Big Canyon and 2,518 from Captain John Rapids. The Washington Department of Fish and Wildlife released 991 PIT tagged yearlings from Lyons Ferry Hatchery. Fish health sampling indicated that, overall, bacterial kidney disease levels could be considered relatively low. Compared to prior years, Quantitative Health Assessment Indices were relatively low at Big Canyon and Captain John Rapids and about average at Pittsburg Landing and Lyons Ferry Hatchery. Mean fork lengths (95% confidence interval) of the PIT tagged groups ranged from 155.4 mm (154.7-156.1 mm) at Captain John Rapids to 171.6 mm (170.7-172.5 mm) at Lyons Ferry Hatchery. Mean condition factors ranged from 1.02 at Lyons Ferry Hatchery to 1.16 at Big Canyon and Captain John Rapids. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 74.4% (73.2-75.5%) for Big Canyon to 85.2% (83.5-87.0%) for Captain John Rapids. Estimated survival from release

  3. Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 2003 Annual Report.

    SciTech Connect

    Rocklage, Stephen J.

    2005-07-01

    The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project (FCAP) sites upstream of Lower Granite Dam in 2003. This was the eighth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 437,633 yearlings released from the Fall Chinook Acclimation Project facilities were short of the 450,000 fish quota. We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 7,492 PIT tagged yearlings from Pittsburg Landing, 7,494 from Big Canyon and 2,497 from Captain John Rapids. Fish health sampling indicated that, overall, bacterial kidney disease levels at the acclimation facilities could be considered medium with 37-83% of the fish sampled rating medium to very high. Mean fork lengths (95% confidence interval) of the PIT tagged groups ranged from 153.7 mm (153.2-154.2 mm) at Captain John Rapids to 164.2 mm (163.9-164.5 mm) at Pittsburg Landing. Mean condition factors ranged from 1.06 at Lyons Ferry Hatchery to 1.22 at Captain John Rapids. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 83.1% (80.7-85.5%) for Big Canyon to 91.7% (87.7-95.7%) for Captain John Rapids. Estimated survival from release to McNary Dam ranged from 59.9% (54.6-65.2%) for Big Canyon to 69.4% (60.5-78.4%) for Captain John Rapids. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 5.8 river kilometers per day (rkm/d) for Captain

  4. Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 2000 Annual Report.

    SciTech Connect

    Rocklage, Stephen J.; Kellar, Dale S.

    2005-07-01

    The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 2000. This was the fifth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 397,339 yearlings released from the Fall Chinook Acclimation Project facilities were short of the 450,000 fish quota. We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 7,477 PIT tagged yearlings from Pittsburg Landing, 7,421 from Big Canyon and 2,488 from Captain John Rapids. The Washington Department of Fish and Wildlife released 980 PIT tagged yearlings from Lyons Ferry Hatchery. Fish health sampling indicated that, overall, bacterial kidney disease levels could be considered relatively low. Compared to prior years, Quantitative Health Assessment Indices were relatively low at Big Canyon and Captain John Rapids and about average at Pittsburg Landing and Lyons Ferry Hatchery. Mean fork lengths (95% confidence interval) of the PIT tagged groups ranged from 157.7 mm (157.3-158.1 mm) at Big Canyon to 172.9 mm (172.2-173.6 mm) at Captain John Rapids. Mean condition factors ranged from 1.06 at Captain John Rapids and Lyons Ferry Hatchery to 1.12 at Big Canyon. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 87.0% (84.7-89.4%) for Pittsburg Landing to 95.2% (91.5-98.9%) for Captain John Rapids. Estimated survival from release to

  5. Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 1999 Annual Report.

    SciTech Connect

    Rocklage, Stephen J.; Kellar, Dale S.

    2005-07-01

    The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project (FCAP) sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 1999. This was the fourth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 453,117 yearlings released from the Fall Chinook Acclimation Project facilities not only slightly exceeded the 450,000 fish quota, but a second release of 76,386 yearlings (hereafter called Surplus) were acclimated at the Big Canyon facility and released about two weeks after the primary releases. We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 9,941 PIT tagged yearlings from Pittsburg Landing, 9,583 from Big Canyon, 2,511 Big Canyon Surplus and 2,494 from Captain John Rapids. The Washington Department of Fish and Wildlife released 983 PIT tagged yearlings from Lyons Ferry Hatchery. Fish health sampling indicated that, overall, bacterial kidney disease levels could be considered relatively low and did not appear to increase after transport to the acclimation facilities. Compared to prior years, Quantitative Health Assessment Indices were relatively low at Pittsburg Landing and Lyons Ferry Hatchery and relatively high at Big Canyon and Captain John Rapids. Mean fork lengths (95% confidence interval) of the release groups ranged from 147.4 mm (146.7-148.1 mm) at Captain John Rapids to 163.7 mm (163.3-164.1 mm) at Pittsburg Landing. Mean condition factors ranged from 1.04 at

  6. Evaluation of a Blood Glucose Monitoring System with Automatic High- and Low-Pattern Recognition Software in Insulin-Using Patients: Pattern Detection and Patient-Reported Insights

    PubMed Central

    Grady, Mike; Campbell, Denise; MacLeod, Kirsty; Srinivasan, Aparna

    2013-01-01

    Background This study aimed to evaluate the performance of a glucose pattern recognition tool incorporated in a blood glucose monitoring system (BGMS) and its association with clinical measures, and to assess user perception and understanding of the pattern messages they receive. Methods Participants had type 1 or type 2 diabetes mellitus and were self-adjusting insulin doses for ≥1 year. During a 4-week home testing period, participants performed ≥6 daily self-tests, adjusted their insulin regimen based on BGMS results, and recorded pattern messages in the logbook. Participants reflected on usability of the pattern tool in a questionnaire. Results Study participants (n = 101) received a mean ± standard deviation of 4.5 ± 1.9 pattern messages per week (3.6 ± 1.8 high glucose patterns and 0.9 ± 1.3 low glucose patterns). Most received ≥1 high (96.5%) and/or ≥1 low (46.0%) pattern message per week. The average number of high- and low-pattern messages per week was associated with higher and lower, respectively, baseline hemoglobin A1c (p < .01) and fasting plasma glucose (p < .05). Participants found high- and low-pattern messages clear and easy to understand (84.2% and 83.2%, respectively) and considered the frequency of low (82.0%) and high (63.4%) pattern messages about right. Overall, 71.3% of participants indicated they preferred to use a meter with pattern messages. Conclusions The on-device Pattern tool identified meaningful blood glucose patterns, highlighting potential opportunities for improving glycemic control in patients who self-adjust their insulin. PMID:23911178

  7. Idaho Habitat/Natural Production Monitoring, Part II: Intensive Monitoring Subproject : Annual Progress Report 1990.

    SciTech Connect

    Kiefer, Russell B.; Forster, Katharine A.

    1992-04-01

    Project 83-7 was established under the Northeast Power Planning Council's 1982 Fish and Wildlife Program, Measure 704 (d) (1) to monitor natural production of anadromous fish, evaluate Bonneville Power Administration habitat improvement project, and develop a credit record for off-site mitigation projects in Idaho. Project 83-7 is divided into two sub-projects: general and intensive monitoring. Results of the intensive monitoring sub-project are reported here. Results from the general monitoring sub-project will be reported in a separate document. The purpose of this intensive monitoring project is to determine the number of returning chinook and steelhead adults necessary to achieve optimal smolt production, and develop mitigation accounting based on increases in smolt production. Two locations are being intensively studied to meet these objectives. Information from this research will be applied to parr monitoring streams statewide to develop escapement objectives and determine success of habitat enhancement projects. Field work began in 1987 in upper Salmon River and Crooked River (South Fork Clearwater River tributary). Methods include using weirs to trap adults, conducting ground and aerial redd counts, snorkeling to estimate parr populations, PIT-tagging juveniles to determine parr-tosmolt survival, trapping fall and spring downstream emigrants with scoop traps, and outplanting adults to determine juvenile carrying capacity. PIT tags also provide a wide range of other information such as migration timing, effects of flow and passage conditions on smolt survival, other factors affecting smolt survival, and growth.

  8. Diagnostics and performance evaluation of neutron monitoring system detectors

    SciTech Connect

    Kniss, T.; Doyle, J.

    2006-07-01

    Neutron monitoring detectors used in Boiling Water Reactor (BWR) power range monitoring control systems are typically miniature fission chambers that remain in the core for many years. Pressurized Water Reactors (PWR) also utilize movable miniature fission chambers for neutron flux mapping during power operations. The baseline performance of the detectors must be established at the time of installation and retested periodically during the life of the detector to evaluate its suitability for continued use. This paper reports on the characteristics that the power range detectors typically exhibit at the beginning of life and describes the normal changes in characteristics that are expected to occur as the detector ages in the in-core environment. Deviations from the normal aging effects that may be revealed through periodic testing are described. Possible root causes for some deviations from the expected performance are discussed. In addition to the power range monitoring detectors, the neutron monitoring system also utilizes other fission chambers for source range or intermediate range neutron monitoring during startup, and neutron or gamma detectors for periodic sensitivity re-calibration of the power range monitoring detectors. Each of the detectors has function specific requirements that call for additional diagnostic testing methods to evaluate performance. Diagnostic tests such as Time Domain Reflectometry and Current vs. Voltage (IV) characterization provide useful information about the condition of the detector and the signal path that links the detector to the reactor monitoring and control system. Typical test results of properly functioning detectors are described and the significance of deviations from a normal result is discussed. (authors)

  9. Y-12 Groundwater Protection Program Calendar Year 2000 Groundwater Monitoring Data Evaluation Report for the Bear Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect

    2001-09-01

    This report presents an evaluation of the groundwater and surface water monitoring data obtained during calendar year (CY) 2000 in the Bear Creek Hydrogeologic Regime (Bear Creek Regime). The Bear Creek Regime encompasses many confirmed and potential sources of groundwater and surface water contamination associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee (Figure A.1). Prepared by the Y-12 Groundwater Protection Program (GWPP), this report addresses applicable provisions of DOE Order 5400.1 (General Environmental Protection Program) that require: (1) an evaluation of the quantity and quality of groundwater and surface water in areas that are, or could be, affected by Y-12 operations, (2) an evaluation of groundwater and surface water quality in areas where contaminants from Y-12 operations are most likely to migrate beyond the DOE Oak Ridge Reservation (ORR) property line, and (3) an evaluation of long-term trends in groundwater quality at Y-12. The following sections of this report contain relevant background information (Section 2.0); describe the results of the respective data evaluations required under DOE Order 5400.1 (Section 3.0); summarize significant findings of each evaluation (Section 4.0); and list the technical reports and regulatory documents cited for more detailed information (Section 5.0). Illustrations (maps and trend graphs) are presented in Appendix A. Brief data summary tables referenced in each section are contained within the sections. Supplemental information and extensive data tables are provided in Appendix B.

  10. 40 CFR 31.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be due 30 days after the reporting period. The final performance report will be due 90 days after the... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Monitoring and reporting program... Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible...

  11. 40 CFR 31.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... be due 30 days after the reporting period. The final performance report will be due 90 days after the... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Monitoring and reporting program... Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible...

  12. 32 CFR 33.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be due 30 days after the reporting period. The final performance report will be due 90 days after the... 32 National Defense 1 2011-07-01 2011-07-01 false Monitoring and reporting program performance. 33... Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible...

  13. 32 CFR 33.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... be due 30 days after the reporting period. The final performance report will be due 90 days after the... 32 National Defense 1 2010-07-01 2010-07-01 false Monitoring and reporting program performance. 33... Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible...

  14. 38 CFR 43.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... be due 30 days after the reporting period. The final performance report will be due 90 days after the... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Monitoring and reporting... Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible...

  15. Geothermal Progress Monitor report No. 8. Progress report

    SciTech Connect

    Not Available

    1983-11-01

    Geothermal Progress Monitor (GPM) Report Number 8 presents information concerning ongoing technology transfer activities and the mechanisms used to support these activities within geothermal R and D programs. A state-by-state review of major geothermal development activities for the reporting period 1 February 1983 through 31 July 1983 is provided. Recent drilling and exploration efforts and the current status of geothermal electric power plant development in the United States are summarized.

  16. TECHNOLOGY EVALUATION REPORT:

    EPA Science Inventory

    A demonstration of the Retech, Inc. Plasma Centrifugal Furnace (PCF) was conducted under the Superfund Innovative Technology Evaluation (SITE) Program at the Department of Energy's (DOE's) Component Development and Integration Facility in Butte, Montana. The furnace uses heat gen...

  17. Engineering flight evaluation report

    NASA Technical Reports Server (NTRS)

    Morrison, J. A.

    1973-01-01

    The primary objective was to determine if the two-segment profile equipment, and operational procedures as defined by the B-727 Simulation Evaluation are operationally sound under all flight conditions expected to be encountered in line service. The evaluation was divided into the following areas: (1) to verify that the two-segment system operates as it was designed; (2) to conduct sufficient tests to secure a supplemental type certificate for line operation of the system; (3) to evaluate the normal operation of the equipment and procedures; (4) to evaluate the need for an autothrottle system for two-segment approaches; (5) to investigate abnormal operation of the equipment and procedures, including abused approaches and malfunctions of airborne and ground components; (6) to determine the accuracy and ease of flying the two-segment approach; (7) to determine the improvement in ground noise levels; and (8) to develop a guest pilot flight test syllabus.

  18. Intensive Evaluation and Monitoring of Chinook Salmon and Steelhead Trout Production, Crooked River and Upper Salmon River Sites, 1992 Annual Report.

    SciTech Connect

    Kiefer, Russell B.; Lockhart, Jerald N.

    1994-12-01

    The purpose of this intensive monitoring project is to determine the number of returning chinook salmon Oncorhynchus tshawytscha and steelhead trout 0. mykiss adults necessary to achieve optimal smolt production, and develop mitigation accounting based on increases in smolt production. Two locations in Idaho are being intensively studied to meet these objectives. Information from this research will be applied to parr monitoring streams statewide to develop escapement objectives and determine success of habitat enhancement projects.

  19. Intensive Evaluation and Monitoring of Chinook Salmon and Steelhead Trout Production Crooked River and Upper Salmon River Sites, 1993 Annual Report.

    SciTech Connect

    Kiefer, Russell B.; Lockhart, Jerald N.

    1995-06-01

    The purpose of this intensive monitoring project is to determine the number of returning chinook and steelhead adults necessary to achieve optimal smolt production and develop mitigation accounting based on increases in smolt production. Two locations in Idaho are being intensively studied to meet these objectives. Information from this research will be applied to parr monitoring streams statewide to develop escapement objectives and determine success of habitat enhancement projects.

  20. 29 CFR 97.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 1 2014-07-01 2013-07-01 true Monitoring and reporting program performance. 97.40 Section... Enforcement § 97.40 Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are... and that performance goals are being achieved. Grantee monitoring must cover each program, function...

  1. 29 CFR 97.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Monitoring and reporting program performance. 97.40 Section... Enforcement § 97.40 Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are... and that performance goals are being achieved. Grantee monitoring must cover each program, function...

  2. 10 CFR 600.240 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Monitoring and reporting program performance. 600.240... Post-Award Requirements § 600.240 Monitoring and reporting program performance. (a) Monitoring by... applicable Federal requirements and that performance goals are being achieved. Grantee monitoring must...

  3. Academic Challenge Program: Evaluation Report.

    ERIC Educational Resources Information Center

    Harty, Harold; And Others

    The evaluation report by Bartholomew Consolidated School Corporation (Columbus, Indiana) describes findings concerning what works and what does not work in the Academic Challenge Program, a gifted and talented education program at the elementary and middle school levels. A corollary purpose of the report is to share the evaluation plan itself,…

  4. Pinellas Plant environmental monitoring report, 1982

    SciTech Connect

    Not Available

    1983-04-01

    This report presents the results of the 1982 annual effluent and environmental monitoring program for the Pinellas Plant. Average maximum ground level concentrations of tritium, carbon 14 and krypton 85 were all less than 0.2% of the standard for continuous monoccupational exposure. Offsite releases of liquid effluents were analyzed for biochemical oxygen demand, suspended solids, fecal coliform bacteria, pH, nitrogen, phosphorus, arsenic, chlorides, chromium, copper, cyanides, detergents, fluorides, iron, lead, mercury, oil plus greases, phenols, turbidity and zinc. No plutonium was released to the environment and monitoring data showed background levels. Calculations were made to determine the radiation doses resulting from releases of tritium oxide, krypton 85 and carbon 14. (ASR)

  5. Augmented Fish Health Monitoring, 1987 Annual Report.

    SciTech Connect

    Michak, Patty

    1989-04-01

    Washington Department of Fisheries has divided the sampling and data collection into three major groups: adult analysis, juvenile analysis and database development. The adult analysis done at spawning includes screening for viral pathogens and Bacterial Kidney Disease (BKD). Pre-spawning mortalities are sampled for the presence of bacterial pathogens and parasites to determine causes of pre-spawning loss. Juvenile analysis involves monthly monitoring; pre-release examinations for viral pathogens, BKD and, where appropriate, whirling disease (M. cerebralis); completion of the Organosomatic analysis on four index stocks, and midterm exams on yearling groups for BKD and M. cerebralis. Database development required constructing fish health monitoring forms and a computer based data entry and retrieval system. We have completed a full year of sampling and data collection, January, 1987 to January, 1988. This report will present and analyze this information.

  6. Quarterly report of RCRA groundwater monitoring data for period July 1--September 30, 1995

    SciTech Connect

    1996-01-01

    Nineteen RCRA groundwater monitoring projects are conducted at the Hanford site. They include treatment, storage, and disposal facilities for both solid and liquid waste. Groundwater monitoring programs described in this report comply with the interim- and final- status federal and state regulations. The RCRA projects are monitored under one of the following programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment or detection. This quarterly report contains data received between July 1 and Sept. 30, 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the July-Sept. quarter, but also data from earlier sampling events not previously reported.

  7. ICPP environmental monitoring report for CY-1996

    SciTech Connect

    Neff, J.K.

    1997-06-01

    Summarized in this report are the data collected through Environmental Monitoring programs conducted at the Idaho Chemical Processing Plant (ICPP) by the Environmental Affairs Department. This report is published in response to DOE Order 5400.1. The ICPP is responsible for complying with all applicable Federal, State, Local and DOE Rules, Regulations and Orders. Radiological effluent and emissions are regulated by the DOE in accordance with the Derived Concentration Guides (DCGs) as presented in DOE Order 5400.5. The State of Idaho regulates nonradiological waste resulting from the ICPP operations including airborne, liquid, and solid waste. Quality Assurance activities have resulted in the ICPP`s implementation of the Environmental Protection Agency (EPA) rules and guidelines pertaining to the collection, analyses, and reporting of environmentally related samples. Where no EPA methods for analyses existed for radionuclides, Lockheed Martin Idaho Technologies Company (LMITCO) methods were used.

  8. NOVOCS TECHNOLOGY EVALUATION REPORT

    EPA Science Inventory

    An evaluation of the MACTEC Inc., NoVOCs(TM) technology ws conducted under the SITE Program, in partnership with the Naval Facilities Engineering Command SW Division, the Navy Environmental Leadership Program, the EPA Technology Innovation Office and Clean Sites, Inc. Specificall...

  9. Annual report of groundwater monitoring at Centralia, Kansas, in 2009.

    SciTech Connect

    LaFreniere, L. M.

    2010-10-19

    in the injection test area (Argonne 2009a). The KDHE (2008a) has requested that sitewide monitoring continue at Centralia until a final remedy has been selected (as part of a Corrective Action Study [CAS] evaluation) and implemented for this site. In response to this request, twice-yearly sampling of 10 monitoring wells and 6 piezometers (Figure 1.1) previously approved by the KDHE for monitoring of the groundwater at Centralia (KDHE 2005a,b) was continued in 2008. The sampling events under this extension of the two-year (2005-2007) monitoring program occurred in March and September 2008 (Argonne 2008b, 2009b). Additional piezometers specifically installed to evaluate the progress of the IM pilot test (PMP1-PMP9; Figure 1.2) were also sampled in 2008; the results of these analyses were reported and discussed separately (Argonne 2009a). On the basis of results of the 2005-2008 sitewide monitoring and the 2008 IM pilot test monitoring, the CCC/USDA recommended a revised sampling program to address both of the continuing monitoring objectives until a CAS for Centralia is developed (Section 4.2 in Argonne 2009b). The elements of this interim monitoring plan are as follows: (1) Annual sampling of twelve previously established (before the pilot test) monitoring points (locations identified in Figure 1.3) and the five outlying pilot test monitoring points (PMP4, PMP5, PMP6, PMP7, PMP9; Figure 1.4); and (2) Sampling twice yearly at the five pilot test monitoring points inside the injection area (PMP1-PMP3, PMP8, MW02; Figure 1.4). With the approval of the KDHE (2009), groundwater sampling for analyses of VOCs and selected other geochemical parameters was conducted at Centralia under the interim monitoring program outlined above in April and October 2009. This report documents the findings of the 2009 monitoring events.

  10. MONITORING TECHNIQUES FOR CARBON FIBER EMISSIONS: EVALUATION B

    EPA Science Inventory

    An evaluation of available measurement methods for continously monitoring the number and mass of carbon fibers emitted from source operations was conducted. A total of eleven candidate monitoring methods were identified based on contact (electrical), locally sensing (optical, mic...

  11. Sensor Evaluation Report

    EPA Science Inventory

    This report is the result of low cost air quality sensor performance trials conducted in the NERL’s on-site laboratories located in the Research Triangle Park, NC during 2012-2013. Such trials were viewed as highly valuable for all parties following the conclusion of the U.S. E...

  12. ASEDRA Evaluation Final Report.

    SciTech Connect

    Mitchell, Dean James; Detwiler, Dr. Rebecca; Sjoden, Dr, Glenn E.

    2008-09-01

    The performance of the Advanced Synthetically Enhanced Detector Resolution Algorithm (ASEDRA) was evaluated by performing a blind test of 29 sets of gamma-ray spectra that were provided by DNDO. ASEDRA is a post-processing algorithm developed at the Florida Institute of Nuclear Detection and Security at the University of Florida (UF/FINDS) that extracts char-acteristic peaks in gamma-ray spectra. The QuickID algorithm, also developed at UF/FINDS, was then used to identify nuclides based on the characteristic peaks generated by ASEDRA that are inferred from the spectra. The ASEDRA/QuickID analysis results were evaluated with respect to the performance of the DHSIsotopeID algorithm, which is a mature analysis tool that is part of the Gamma Detector Response and Analysis Software (GADRAS). Data that were used for the blind test were intended to be challenging, and the radiation sources included thick shields around the radioactive materials as well as cargo containing naturally occurring radio-active materials, which masked emission from special nuclear materials and industrial isotopes. Evaluation of the analysis results with respect to the ground truth information (which was provided after the analyses were finalized) showed that neither ASEDRA/QuickID nor GADRAS could identify all of the radiation sources correctly. Overall, the purpose of this effort was primarily to evaluate ASEDRA, and GADRAS was used as a standard against which ASEDRA was compared. Although GADRAS was somewhat more accurate on average, the performance of ASEDRA exceeded that of GADRAS for some of the unknowns. The fact that GADRAS also failed to identify many of the radiation sources attests to the difficulty of analyzing the blind-test data that were used as a basis for the evaluation. This evaluation identified strengths and weaknesses of the two analysis approaches. The importance of good calibration data was also clear because the performance of both analysis methods was impeded by the

  13. Great Basin Integrated Landscape Monitoring Pilot Summary Report

    USGS Publications Warehouse

    Finn, Sean P.; Kitchell, Kate; Baer, Lori Anne; Bedford, David R.; Brooks, Matthew L.; Flint, Alan L.; Flint, Lorraine E.; Matchett, J.R.; Mathie, Amy; Miller, David M.; Pilliod, David S.; Torregrosa, Alicia; Woodward, Andrea

    2010-01-01

    The Great Basin Integrated Landscape Monitoring Pilot project (GBILM) was one of four regional pilots to implement the U.S. Geological Survey (USGS) Science Thrust on Integrated Landscape Monitoring (ILM) whose goal was to observe, understand, and predict landscape change and its implications on natural resources at multiple spatial and temporal scales and address priority natural resource management and policy issues. The Great Basin is undergoing rapid environmental change stemming from interactions among global climate trends, increasing human populations, expanding and accelerating land and water uses, invasive species, and altered fire regimes. GBLIM tested concepts and developed tools to store and analyze monitoring data, understand change at multiple scales, and forecast landscape change. The GBILM endeavored to develop and test a landscape-level monitoring approach in the Great Basin that integrates USGS disciplines, addresses priority management questions, catalogs and uses existing monitoring data, evaluates change at multiple scales, and contributes to development of regional monitoring strategies. GBILM functioned as an integrative team from 2005 to 2010, producing more than 35 science and data management products that addressed pressing ecosystem drivers and resource management agency needs in the region. This report summarizes the approaches and methods of this interdisciplinary effort, identifies and describes the products generated, and provides lessons learned during the project.

  14. Sanitary landfill groundwater monitoring report. Annual report, 1992

    SciTech Connect

    Not Available

    1993-02-01

    The Sanitary Landfill at the Savannah River Site (SRS) is composed of the original 32-acre landfill, plus expansion areas to the north and south that added 16 and 22 acres, respectively, to the facility. The landfill is subject to the requirements of the Resource Conservation and Recovery Act and currently operates under South Carolina Department of Health and Environmental Control (SCDHEC) Domestic Waste Permit 87A. Fifty-seven wells of the LFW series monitor the groundwater quality in Steed Pond Aquifer (formerly Aquifer Zone I/IIC{sub 2}) (Water Table) beneath the Sanitary Landfill. These wells are sampled quarterly for certain indicator parameters, inorganics, metals, radionuclides, volatile organics, and other constituents as part of the SRS Groundwater Monitoring Program and to comply with the SCDHEC domestic waste permit. This report reviews the 1992 activities of the SRS Groundwater Monitoring Program.

  15. The EMEFS model evaluation. An interim report

    SciTech Connect

    Barchet, W.R.; Dennis, R.L.; Seilkop, S.K.; Banic, C.M.; Davies, D.; Hoff, R.M.; Macdonald, A.M.; Mickle, R.E.; Padro, J.; Puckett, K.; Byun, D.; McHenry, J.N.; Karamchandani, P.; Venkatram, A.; Fung, C.; Misra, P.K.; Hansen, D.A.; Chang, J.S.

    1991-12-01

    The binational Eulerian Model Evaluation Field Study (EMEFS) consisted of several coordinated data gathering and model evaluation activities. In the EMEFS, data were collected by five air and precipitation monitoring networks between June 1988 and June 1990. Model evaluation is continuing. This interim report summarizes the progress made in the evaluation of the Regional Acid Deposition Model (RADM) and the Acid Deposition and Oxidant Model (ADOM) through the December 1990 completion of a State of Science and Technology report on model evaluation for the National Acid Precipitation Assessment Program (NAPAP). Because various assessment applications of RADM had to be evaluated for NAPAP, the report emphasizes the RADM component of the evaluation. A protocol for the evaluation was developed by the model evaluation team and defined the observed and predicted values to be used and the methods by which the observed and predicted values were to be compared. Scatter plots and time series of predicted and observed values were used to present the comparisons graphically. Difference statistics and correlations were used to quantify model performance. 64 refs., 34 figs., 6 tabs.

  16. 22 CFR 135.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Monitoring and reporting program performance... Reports, Records, Retention, and Enforcement § 135.40 Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible for managing the day-to-day operations of grant and...

  17. 49 CFR 18.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Monitoring and reporting program performance. 18... Reports, Records, Retention, and Enforcement § 18.40 Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible for managing the day-to-day operations of grant and...

  18. 20 CFR 437.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Monitoring and reporting program performance... Reports, Records, Retention, and Enforcement § 437.40 Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible for managing the day-to-day operations of grant and...

  19. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... MARKETING § 108.20 Monitoring office responsibility for monitoring plans and reports. (a) Submission of documentation. Pursuant to initiation of marketing, the applicant shall submit to the monitoring office reports documenting the implementation of the AFHM plan, including sales or rental reports, as required by...

  20. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... MARKETING § 108.20 Monitoring office responsibility for monitoring plans and reports. (a) Submission of documentation. Pursuant to initiation of marketing, the applicant shall submit to the monitoring office reports documenting the implementation of the AFHM plan, including sales or rental reports, as required by...

  1. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... MARKETING § 108.20 Monitoring office responsibility for monitoring plans and reports. (a) Submission of documentation. Pursuant to initiation of marketing, the applicant shall submit to the monitoring office reports documenting the implementation of the AFHM plan, including sales or rental reports, as required by...

  2. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... MARKETING § 108.20 Monitoring office responsibility for monitoring plans and reports. (a) Submission of documentation. Pursuant to initiation of marketing, the applicant shall submit to the monitoring office reports documenting the implementation of the AFHM plan, including sales or rental reports, as required by...

  3. 28 CFR 66.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... reporting period. The final performance report will be due 90 days after the expiration or termination of... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Monitoring and reporting program... Requirements Reports, Records, Retention, and Enforcement § 66.40 Monitoring and reporting program...

  4. 13 CFR 143.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... reporting period. The final performance report will be due 90 days after the expiration or termination of... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Monitoring and reporting program... Requirements Reports, Records, Retention, and Enforcement § 143.40 Monitoring and reporting program...

  5. 15 CFR 24.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... reporting period. The final performance report will be due 90 days after the expiration or termination of... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Monitoring and reporting program... Requirements Reports, Records, Retention, and Enforcement § 24.40 Monitoring and reporting program...

  6. Economic evaluation report

    SciTech Connect

    Not Available

    1992-03-01

    The objective of this report is to establish a database of costs associated with operating a circulating fluidized bed boiler for electric power production in a utility environment. Such data and information can be used by others for resource planning and for comparisons with competing technologies. Costs are also presented for the engineering, construction and start-up of the Nucla CFB. These are compared with estimates made in 1981 prior to completing detailed engineering. Detailed monthly operating costs over the testing period covered by the Cooperative Agreement, from September 1988 through January 1991, are presented in Appendix D. An overall summary of cost data for this period is presented in the same format in Appendix C. These data were generated by CUEA using reporting requirements established by the Rural Electrification Administration`s Uniform System of Accounts. This accounting system is consistent with that used by the Federal Energy Regulatory Commission`s Uniform System of Accounts, which is prescribed for public utilities and licensees subject to the provisions of the Federal Power Act. The definitions of terms used in the REA code of accounts are contained in Appendix B.

  7. Economic evaluation report

    SciTech Connect

    Not Available

    1992-03-01

    The objective of this report is to establish a database of costs associated with operating a circulating fluidized bed boiler for electric power production in a utility environment. Such data and information can be used by others for resource planning and for comparisons with competing technologies. Costs are also presented for the engineering, construction and start-up of the Nucla CFB. These are compared with estimates made in 1981 prior to completing detailed engineering. Detailed monthly operating costs over the testing period covered by the Cooperative Agreement, from September 1988 through January 1991, are presented in Appendix D. An overall summary of cost data for this period is presented in the same format in Appendix C. These data were generated by CUEA using reporting requirements established by the Rural Electrification Administration's Uniform System of Accounts. This accounting system is consistent with that used by the Federal Energy Regulatory Commission's Uniform System of Accounts, which is prescribed for public utilities and licensees subject to the provisions of the Federal Power Act. The definitions of terms used in the REA code of accounts are contained in Appendix B.

  8. 1996 LMITCO environmental monitoring program report for the Idaho National Engineering and Environmental Laboratory

    SciTech Connect

    1997-09-01

    This report describes the calendar year 1996 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory (INEEL). Results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs are included in this report. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1996 data with program-specific regulatory guidelines and past data to evaluate trends.

  9. Intensive Evaluation and Monitoring of Chinook Salmon and Steelhead Trout Production, Crooked River and Upper Salmon River Sites, 1994 Annual Report.

    SciTech Connect

    Kiefer, Russell B.; Lockhart, Jerald N.

    1997-06-01

    The purpose of this intensive monitoring project is to determine the number of returning chinook and steelhead adults necessary to achieve optimal smolt production, and develop mitigation accounting based on increases in smolt production. Two locations in Idaho are being intensively studied to meet these objectives. Information from this research will be applied to parr monitoring streams statewide to develop escapement objectives and determine success of habitat enhancement projects. This project to date has developed good information on the relationship between adult chinook salmon escapement and smolt production at low to medium seeding levels. This information for steelhead includes a fair estimate of carrying capacity. To date, we have been unable to accurately estimate egg-to-parr survival for steelhead. Future efforts will include determining the relationship between adult steelhead trout escapement and age 1 + parr production, determining environmental and habitat factors that affect smolt production, and developing project results to help the region make good management decisions for anadromous fish.

  10. Intensive Evaluation and Monitoring of Chinook Salmon and Steelhead Trout Production, Crooked River and Upper Salmon River Sites, 1995 Annual Report.

    SciTech Connect

    Kiefer, Russell B.; Lockhart, Jerald N.

    1999-10-01

    The purpose of this intensive monitoring project is to determine the number of returning chinook salmon and steelhead trout adults necessary to achieve optimal smolt production and develop habitat enhancement mitigation accounting based on increases in wild/natural smolt production. Two locations in Idaho are being intensively studied to meet these objectives. Information from this research will be applied to parr monitoring streams statewide to develop escapement objectives and determine success of habitat enhancement projects. The project to date has developed good information on the relationship between chinook salmon adult escapement and smolt production at low to medium seeding levels. Adult chinook salmon escapements have been too low for us to test carrying capacity. For steelhead trout, they have developed a relationship between parr populations and smolt production at low to high seeding levels, with limited information on carrying capacity.

  11. Evaluation of Diesel Exhaust Continuous Monitors in Controlled Environmental Conditions

    PubMed Central

    Yu, Chang Ho; Patton, Allison P.; Zhang, Andrew; Fanac, Zhi-Hua (Tina); Weisel, Clifford P.; Lioy, Paul J.

    2015-01-01

    Diesel exhaust (DE) contains a variety of toxic air pollutants, including diesel particulate matter (DPM) and gaseous contaminants (e.g., carbon monoxide (CO)). DPM is dominated by fine (PM2.5) and ultrafine particles (UFP), and can be representatively determined by its thermal-optical refractory as elemental carbon (EC) or light-absorbing characteristics as black carbon (BC). The currently accepted reference method for sampling and analysis of occupational exposure to DPM is the National Institute for Occupational Safety and Health (NIOSH) Method 5040. However, this method cannot provide in-situ short-term measurements of DPM. Thus, real-time monitors are gaining attention to better examine DE exposures in occupational settings. However, real-time monitors are subject to changing environmental conditions. Field measurements have reported interferences in optical sensors and subsequent real-time readings, under conditions of high humidity and abrupt temperature changes. To begin dealing with these issues, we completed a controlled study to evaluate five real-time monitors: Airtec real-time DPM/EC Monitor, TSI SidePak Personal Aerosol Monitor AM510 (PM2.5), TSI Condensation Particle Counter 3007, microAeth AE51 BC Aethalometer, and Langan T15n CO Measurer. Tests were conducted under different temperatures (55, 70, and 80 °F), relative humidity (10, 40, and 80%), and DPM concentrations (50 and 200 µg/m3) in a controlled exposure facility. The 2-hour averaged EC measurements from the Airtec instrument showed relatively good agreement with NIOSH Method 5040 (R2=0.84; slope=1.17±0.06; N=27) and reported ~17% higher EC concentrations than the NIOSH reference method. Temperature, relative humidity, and DPM levels did not significantly affect relative differences in 2-hour averaged EC concentrations obtained by the Airtec instrument versus the NIOSH method (p<0.05). Multiple linear regression analyses, based on 1-min averaged data, suggested combined effects of up to 5

  12. Report of Field Test Evaluation.

    ERIC Educational Resources Information Center

    Michigan State Univ., East Lansing. Regional Instructional Materials Center for Handicapped Children and Youth.

    Reported by the Great Lakes Region Special Education Instructional Materials Center are field test evaluation of 18 auditory instructional materials for use with handicapped children who learn best through the auditory modality. Among materials evaluated are a taped program on use of the abacus and a cassette audiotape on bird habits and sounds.…

  13. Sanitary Landfill 1991 annual groundwater monitoring report

    SciTech Connect

    Thompson, C.Y.; Norrell, G.T.; Bennett, C.B.

    1992-02-01

    The Savannah River Site (SRS) Sanitary Landfill is an approximately seventy acre site located just south of SRS Road C between the Savannah River Site`s B-Area and Upper Three Runs Creek. Results from the first through third quarter 1991 groundwater monitoring date continue to show evidence of elevated levels of several hazardous constituents beneath the Sanitary Landfill: tritium, vinyl chloride, total radium, cadmium, 1,1,1-trichloroethane, 1,2 dichloroethane, 1,4 dichlorobenzene, trichloroethylene (TCE), tetrachloroethylene, and 1,1 dichloroethylene in excess of the primary drinking water standards were observed in at least one well monitoring the Sanitary Landfill during the third quarter of 1991. All of these constituents, except radium, were observed in the lower half of the original thirty-two acre site or the southern expansion site. Trichloroethylene and vinyl chloride are the primary organic contaminants in groundwater beneath the Sanitary Landfill. Vinyl chloride has become the primary contaminant during 1991. Elevated levels of benzene were consistently detected in LFW 7 in the past, but were not present in any LFW wells during the third quarter of 1991. A minor tritium plume is present in the central part of original thirty-two acre landfill. Elevated levels of tritium above the PDWS were consistently present in LFW 10A through 1991. This well has exhibited elevated tritium activities since the second quarter of 1989. Contaminant concentrations in the Sanitary Landfill are presented and discussed in this report.

  14. Sanitary Landfill 1991 annual groundwater monitoring report

    SciTech Connect

    Thompson, C.Y.; Norrell, G.T.; Bennett, C.B.

    1992-02-01

    The Savannah River Site (SRS) Sanitary Landfill is an approximately seventy acre site located just south of SRS Road C between the Savannah River Site's B-Area and Upper Three Runs Creek. Results from the first through third quarter 1991 groundwater monitoring date continue to show evidence of elevated levels of several hazardous constituents beneath the Sanitary Landfill: tritium, vinyl chloride, total radium, cadmium, 1,1,1-trichloroethane, 1,2 dichloroethane, 1,4 dichlorobenzene, trichloroethylene (TCE), tetrachloroethylene, and 1,1 dichloroethylene in excess of the primary drinking water standards were observed in at least one well monitoring the Sanitary Landfill during the third quarter of 1991. All of these constituents, except radium, were observed in the lower half of the original thirty-two acre site or the southern expansion site. Trichloroethylene and vinyl chloride are the primary organic contaminants in groundwater beneath the Sanitary Landfill. Vinyl chloride has become the primary contaminant during 1991. Elevated levels of benzene were consistently detected in LFW 7 in the past, but were not present in any LFW wells during the third quarter of 1991. A minor tritium plume is present in the central part of original thirty-two acre landfill. Elevated levels of tritium above the PDWS were consistently present in LFW 10A through 1991. This well has exhibited elevated tritium activities since the second quarter of 1989. Contaminant concentrations in the Sanitary Landfill are presented and discussed in this report.

  15. 22 CFR 226.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each... clearance requirements of 5 CFR part 1320 when requesting performance data from recipients. ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Monitoring and reporting program...

  16. 29 CFR 97.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Monitoring and reporting program performance. 97.40 Section... Enforcement § 97.40 Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible for managing the day-to-day operations of grant and subgrant supported activities. Grantees...

  17. 24 CFR 85.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Monitoring and reporting program..., Retention, and Enforcement § 85.40 Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible for managing the day-to-day operations of grant and subgrant supported...

  18. 7 CFR 3016.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Monitoring and reporting program performance. 3016.40... Enforcement § 3016.40 Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible for managing the day-to-day operations of grant and subgrant supported activities. Grantees...

  19. 43 CFR 12.80 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Monitoring and reporting program... Enforcement § 12.80 Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible for managing the day-to-day operations of grant and subgrant supported activities. Grantees...

  20. 10 CFR 600.240 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Monitoring and reporting program performance. 600.240... Post-Award Requirements § 600.240 Monitoring and reporting program performance. (a) Monitoring by grantees. Grantees are responsible for managing the day-to-day operations of grant and subgrant...

  1. 40 CFR 52.1680 - Control strategy: Monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Control strategy: Monitoring and reporting. (a) Section 227.6 (a) and (f) are disapproved because they are not consistent with the continuous monitoring and reporting requirements of 40 CFR 51.214. ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Control strategy: Monitoring...

  2. 40 CFR 141.706 - Reporting source water monitoring results.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Reporting source water monitoring...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.706 Reporting source water monitoring results....

  3. 40 CFR 141.706 - Reporting source water monitoring results.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Reporting source water monitoring...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.706 Reporting source water monitoring results....

  4. 40 CFR 141.706 - Reporting source water monitoring results.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Reporting source water monitoring...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.706 Reporting source water monitoring results....

  5. 40 CFR 52.1680 - Control strategy: Monitoring and reporting.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Control strategy: Monitoring and reporting. (a) Section 227.6 (a) and (f) are disapproved because they are not consistent with the continuous monitoring and reporting requirements of 40 CFR 51.214. ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Control strategy: Monitoring...

  6. 40 CFR 52.1680 - Control strategy: Monitoring and reporting.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Control strategy: Monitoring and reporting. (a) Section 227.6 (a) and (f) are disapproved because they are not consistent with the continuous monitoring and reporting requirements of 40 CFR 51.214. ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Control strategy: Monitoring...

  7. 40 CFR 141.706 - Reporting source water monitoring results.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Reporting source water monitoring...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.706 Reporting source water monitoring results....

  8. 40 CFR 141.706 - Reporting source water monitoring results.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Reporting source water monitoring...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.706 Reporting source water monitoring results....

  9. 40 CFR 464.03 - Monitoring and reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Monitoring and reporting requirements. 464.03 Section 464.03 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT....03 Monitoring and reporting requirements. (a) As an alternative to monitoring for TTO (total...

  10. 40 CFR 464.03 - Monitoring and reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Monitoring and reporting requirements. 464.03 Section 464.03 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT....03 Monitoring and reporting requirements. (a) As an alternative to monitoring for TTO (total...