Sample records for nasa prime contractor

  1. Technology transfer from the viewpoint of a NASA prime contractor

    NASA Technical Reports Server (NTRS)

    Dyer, Gordon

    1992-01-01

    Viewgraphs on technology transfer from the viewpoint of a NASA prime contractor are provided. Technology Transfer Program for Manned Space Systems and the Technology Transfer Program status are addressed.

  2. 48 CFR 45.501 - Prime contractor alternate locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  3. 14 CFR 1240.105 - Special procedures-NASA and NASA contractor employees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Special procedures-NASA and NASA contractor...—NASA and NASA contractor employees. (a) A NASA Headquarters office, a NASA field installation, or a NASA contractor may submit to the Board an application for an award identifying the originator(s) of...

  4. 14 CFR 1240.105 - Special procedures-NASA and NASA contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Special procedures-NASA and NASA contractor...—NASA and NASA contractor employees. (a) A NASA Headquarters office, a NASA field installation, or a NASA contractor may submit to the Board an application for an award identifying the originator(s) of...

  5. 14 CFR 1240.105 - Special procedures-NASA and NASA contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Special procedures-NASA and NASA contractor...—NASA and NASA contractor employees. (a) A NASA Headquarters office, a NASA field installation, or a NASA contractor may submit to the Board an application for an award identifying the originator(s) of...

  6. 75 FR 43166 - Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...

  7. 48 CFR 49.108-2 - Prime contractor's rights and obligations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor's rights and obligations. 49.108-2 Section 49.108-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-2 Prime contractor's rights...

  8. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  9. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  10. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  11. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  12. Government - Prime Contractor - Subcontractor Relationships: An Analysis.

    DTIC Science & Technology

    1979-12-01

    contract, prime contractor frustration and animosity due to over zealous 122 JAM ,- Government managers, and subcontractor problems of "over- reach" and...Journal, Vol. 12, No. 2,Second Quarter, 1978. 41. Singer, N.P., "The Unheard of Standard Set of Sub- contract Terms and Conditions - As Easy as Pumpkin Pie

  13. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ..., [email protected] . SUPPLEMENTARY INFORMATION: I. Abstract The NASA Contractor Financial Management... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 12-019] Information Collection; NASA Contractor Financial Management Reports AGENCY: National Aeronautics and Space Administration (NASA). ACTION...

  14. 48 CFR 1019.202-70-5 - Incentives for prime contractor participation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for prime contractor participation. (a) Under the Small Business Act, 15 U.S.C. 637(d)(4)(E), Treasury.../management factors. (b) A mentor's performance will be evaluated against the criteria described in DTAR 1052... contracts as a factor in determining contractor responsibility under FAR 19.705-5(a)(1). (d) Mentor-protégé...

  15. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.

  16. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors. Decatur Mayor Tab Bowling chats with NASA retiree Don Odum

  17. 14 CFR 1240.105 - Special initial awards-NASA and NASA contractor employees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Special initial awards-NASA and NASA... initial awards—NASA and NASA contractor employees. (a) Patent Application Awards. (1) When the Board... Property or the Patent or Intellectual Property Counsel at a NASA Center that an invention made by an...

  18. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts. MSFC Director Todd May and Decatur Mayor Tab Bowling enjoy a light moment.

  19. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors. Decatur Mayor Tab Bowling greets David Brock.

  20. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. OSAC Director Johnny Stephenson talks about Marshall's Mission areas to audience

  1. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. City of Hartselle Mayor Randy Garrison welcomes attendees to conference.

  2. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts. MSFC Director Todd May shares opening remarks.

  3. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. Decatur Mayor Tab Bowling welcomes attendees.

  4. 14 CFR § 1240.105 - Special initial awards-NASA and NASA contractor employees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Special initial awards-NASA and NASA... initial awards—NASA and NASA contractor employees. (a) Patent Application Awards. (1) When the Board... Property or the Patent or Intellectual Property Counsel at a NASA Center that an invention made by an...

  5. 48 CFR 719.273-3 - Incentives for prime contractor participation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Development (USAID) Mentor-Protégé Program 719.273-3 Incentives for prime contractor participation. (a... provides additional guidance. (b) Costs incurred by a Mentor to provide developmental assistance, as... reimbursable as a direct cost under a USAID contract. If USAID is the mentor's responsible audit agency under...

  6. NASA Office of Small and Disadvantaged Business Utilization

    NASA Technical Reports Server (NTRS)

    2001-01-01

    The Office of Small and Disadvantaged Business Utilization (OSDBU) within NASA promotes the utilization of small, disadvantaged, and women-owned small businesses in compliance with Federal laws, regulations, and policies. We assist such firms in obtaining contracts and subcontracts with NASA and its prime contractors. The OSDBU also facilitates the participation of small businesses in NASA's technology transfer and commercialization activities. Our driving philosophy is to consider small businesses as our products. Our customers are the NASA Enterprises, Field Centers, Functional Staff Offices, major prime contractors, and other large institutions. We hone the skills of our products to make them marketable to our customers in the performance of NASA missions.

  7. David Brock addresses the "How to Launch Your Business with NASA" forum.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. David Brock, head of Marshall's Small Business Office talks about doing business with Marshall.

  8. Searching for Contracting Patterns over Time: Do Prime Contractor and Subcontractor Relations Follow Similar Patterns for Professional Services Provision?

    ERIC Educational Resources Information Center

    Ponomariov, Branco; Kingsley, Gordon; Boardman, Craig

    2011-01-01

    This paper compares over a 12-year period (1) patterns of contracting between a state transportation agency and its prime contractors providing engineering design services with (2) patterns between these prime contractors and their subcontractors. We find evidence of different contracting patterns at each level that emerge over time and coexist in…

  9. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Prime contractor performance requirements (limitations on subcontracting). 125.6 Section 125.6 Business Credit and Assistance SMALL BUSINESS... subcontracting). (a) In order to be awarded a full or partial small business set-aside contract, an 8(a) contract...

  10. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the Contractor's established financial management information system. (b) Lower level detail used by the Contractor for its own management purposes to validate information provided to NASA shall be... management reporting. 1852.242-73 Section 1852.242-73 Federal Acquisition Regulations System NATIONAL...

  11. NASA/contractor partnership on the second TDRSS ground terminal program: Breaking barriers

    NASA Technical Reports Server (NTRS)

    Tierney, Paul G.

    1992-01-01

    The Second Tracking and Data Relay Satellite System (TDRSS) Ground Terminal (STGT) Program from its technical and programmatic backgrounds is introduced and then several techniques to enhance communication and empower the NASA Contractor team are described. A major factor in our success was an approach used to shorten the time span of the Critical Design Review phase. This approach is described. The relationships involving NASA's O&M contractor are discussed. A set of lessons learned is included.

  12. 48 CFR 49.104 - Duties of prime contractor after receipt of notice of termination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Duties of prime contractor after receipt of notice of termination. 49.104 Section 49.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.104...

  13. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for Research, Development, Test, and Evaluation, Fiscal Year 1987.

    DTIC Science & Technology

    1987-01-01

    Headquarters Services Directorate for Information Operations and Reports D) ,( /NT IS lientitra on nn Iber for hIs bh act& r, s (i0 ’F H 7 FOREWORD 500...This report provides information on the 500 contractors that received the largest dollar volume in Department of Defense (DOD) prime contract awards... report presents summary data on the 500 prime contractors receiving the largest dollar volume in Department of Defense (DOD) awards over $25,000 for

  14. NASA 2012 Small Business Industry Awards (SBIA)

    NASA Image and Video Library

    2013-04-23

    NASA Administrator Charles Bolden, left, NASA Associate Administrator for Small Business Programs Glenn A. Delgado, and NASA Deputy Administrator Lori Garver, right, pose for a photograph with Autumn Sellars, President/CEO of A2Research of Huntsville, Alabama after the company was awarded the Small Business Prime Contractor of the Year at NASA Headquarters, Tuesday, April 23, 2013 in Washington. Photo Credit: (NASA/Bill Ingalls)

  15. Summary Report of the Seventh Annual NASA/Contractors Conference on Quality and Productivity: "Total Quality Leadership"

    NASA Technical Reports Server (NTRS)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity on October 12-13, 1990, in Grenelefe, Florida. The panel presentations and keynote speeches revolving around the theme of 'Total Quality Leadership" provided a solid base of understanding of the importance, benefits, and principles of total quality management. The implementation of these strategies is critical if we are to effectively pursue our mission of continuous quality improvement and reliability in our products, processes, and services. The annual NASA/contractors conferences serve as catalysts for achieving success in this mission.

  16. 48 CFR 3052.219-72 - Evaluation of prime contractor participation in the DHS mentor-protégé program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor participation in the DHS mentor-protégé program. 3052.219-72 Section 3052.219-72 Federal... Evaluation of prime contractor participation in the DHS mentor-protégé program. As prescribed in (HSAR) 48... the DHS Mentor-Protégé Program (JUN 2006) This solicitation contains a source selection factor or...

  17. 7th Annual NASA/Contractors Conference on Quality and Productivity: "Total Quality Leadership"

    NASA Technical Reports Server (NTRS)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity on October 12-13, 1990, in Grenelefe, Florida. The panel presentations and keynote speeches revolving around the theme of 'Total Quality Leadership' provided a solid base of understanding of the importance, benefits, and principles of total quality management. The implementation of these strategies is critical if we are to effectively pursue our mission of continuous quality improvement and reliability in our products, processess, and services. The annual NASA/contractors conferences serve as catalysts for achieving success in this mission. The conference was highlighted by the announcement of the first recipients of the George M. Low Trophy: NASA's Quality and Excellence Award. My congratulations go out to all nine finalist organizations and to the two recipients of this prestigious honor: Rockwell Space Systems Division and Marotta Scientific Controls, Inc. (the first small business to achieve this honor). These organizations have demonstrated a commitment to quality that is unsurpassed in the aerospace industry. This report summarizes the presentations and is not intended to be a verbatim proceedings document. You are encouraged to contact the speakers with any requests for further information.

  18. NASA 2012 Small Business Industry Awards (SBIA)

    NASA Image and Video Library

    2013-04-23

    NASA Administrator Charles Bolden, left, NASA Associate Administrator for Small Business Programs Glenn A. Delgado, second from left, and NASA Deputy Administrator Lori Garver, right, pose for a photograph with Patricia Rice, Manager, Supplier Diversity, Small Business Liaison Officer & Supplier Development, Pratt & Whitney Rocketdyne, Inc. and Jim Maser, President of Pratt & Whitney Rocketdyne, Inc. of East Hartford, Connecticut after the company was awarded the Large Business Prime Contractor of the Year at NASA Headquarters, Tuesday, April 23, 2013 in Washington. Photo Credit: (NASA/Bill Ingalls)

  19. 40 CFR 35.938-6 - Progress payments to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Progress payments to contractors. 35... § 35.938-6 Progress payments to contractors. (a) Policy. EPA policy is that, except as State law otherwise provides, grantees should make prompt progress payments to prime contractors and prime contractors...

  20. NASA New England Outreach Center

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The NASA New England Outreach Center in Nashua, New Hampshire was established to serve as a catalyst for heightening regional business awareness of NASA procurement, technology and commercialization opportunities. Emphasis is placed on small business participation, with the highest priority given to small disadvantaged businesses, women-owned businesses, HUBZone businesses, service disabled veteran owned businesses, and historically black colleges and universities and minority institutions. The Center assists firms and organizations to understand NASA requirements and to develop strategies to capture NASA related procurement and technology opportunities. The establishment of the NASA Outreach Center serves to stimulate business in a historically underserved area. NASA direct business awards have traditionally been highly present in the West, Midwest, South, and Southeast areas of the United States. The Center guides and assists businesses and organizations in the northeast to target opportunities within NASA and its prime contractors and capture business and technology opportunities. The Center employs an array of technology access, one-on-one meetings, seminars, site visits, and targeted conferences to acquaint Northeast firms and organizations with representatives from NASA and its prime contractors to learn about and discuss opportunities to do business and access the inventory of NASA technology. This stimulus of interaction also provides firms and organizations the opportunity to propose the use of their developed technology and ideas for current and future requirements at NASA. The Center provides a complement to the NASA Northeast Regional Technology Transfer Center in developing prospects for commercialization of NASA technology. In addition, the Center responds to local requests for assistance and NASA material and documents, and is available to address immediate concerns and needs in assessing opportunities, timely support to interact with NASA Centers on

  1. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  2. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (MAY 2009) (a) Prime contractors are encouraged to participate in the...

  3. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  4. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  5. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  6. Contractor relationships and inter-organizational strategies in NASA's R and D acquisition process

    NASA Technical Reports Server (NTRS)

    Guiltinan, J.

    1976-01-01

    Interorganizational analysis of NASA's acquisition process for research and development systems is discussed. The importance of understanding the contractor environment, constraints, and motives in selecting an acquisition strategy is demonstrated. By articulating clear project goals, by utilizing information about the contractor and his needs at each stage in the acquisition process, and by thorough analysis of the inter-organizational relationship, improved selection of acquisition strategies and business practices is possible.

  7. 48 CFR 1852.245-73 - Financial reporting of NASA property in the custody of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Financial reporting of NASA... CONTRACT CLAUSES Texts of Provisions and Clauses 1852.245-73 Financial reporting of NASA property in the custody of contractors. As prescribed in 1845.106-70(d), insert the following clause: Financial Reporting...

  8. Kennedy Space Center's NASA/Contractor Team-Centered Total Quality Management Seminar: Results, methods, and lessons learned

    NASA Technical Reports Server (NTRS)

    Kinlaw, Dennis C.; Eads, Jeannette

    1992-01-01

    It is apparent to everyone associated with the Nation's aeronautics and space programs that the challenge of continuous improvement can be reasonably addressed only if NASA and its contractors act together in a fully integrated and cooperative manner that transcends the traditional boundaries of proprietary interest. It is, however, one thing to assent to the need for such integration and cooperation; it is quite another thing to undertake the hard tasks of turning such a need into action. Whatever else total quality management is, it is fundamentally a team-centered and team-driven process of continuous improvement. The introduction of total quality management at KSC, therefore, has given the Center a special opportunity to translate the need for closer integration and cooperation among all its organizations into specific initiatives. One such initiative that NASA and its contractors have undertaken at KSC is a NASA/Contractor team-centered Total Quality Management Seminar. It is this seminar which is the subject of this paper. The specific purposes of this paper are to describe the following: Background, development, and evolution of Kennedy Space Center's Total Quality Management Seminar; Special characteristics of the seminar; Content of the seminar; Meaning and utility of a team-centered design for TQM training; Results of the seminar; Use that one KSC contractor, EG&G Florida, Inc. has made of the seminar in its Total Quality Management initiative; and Lessons learned.

  9. All Prime Contract Awards by State or Country, Place, and Contractor, FY 84. Part 1 (Antigua - Zaire).

    DTIC Science & Technology

    1984-01-01

    AD-RI65 86 ALL PRIME CONTRACT AWARDS BY STATE OR COUNTRY PLACE AND 1/ 9 CONTRACTOR FY 84, (U) WA HINGTON HEADQUARTERS SERVICES (DOD) DC DIRECTORATE...ISPONSORING I8b. OFFICE SYMBOL 9 . PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER *ORGANIZATION I (if applicable) 8c ADDRESS (City, State, and ZIP Code) 10...number) FIELD GROUP SUB-GROUP 9 . ABSTRACT (Continue on reverse if necessary and identify by block number) ....- 00 E / ELEGT F . _,0 ISTRIBUITION

  10. The NASA welding assessment program

    NASA Technical Reports Server (NTRS)

    Scott-Monck, J.; Bozek, J.

    1984-01-01

    The potential cost and performance advantages of welding was understood but ignored by solar panel manufacturers in the U.S. Although NASA, DOD and COMSAT have supported welding development efforts, soldering remains the only U.S. space qualified method for interconnecting solar cells. The reason is that no U.S. satellite prime contractor found it necessary, due to mission requirements, to abandon the space proven soldering process. It appears that the proposed NASA space station program will provide an array requirement, a 10 year operation in a low Earth orbital environment, that mandates welding. The status of welding technology in the U.S. is assessed.

  11. Contractor and government - Teamwork and commitment

    NASA Technical Reports Server (NTRS)

    Griffin, G. D.

    1985-01-01

    Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

  12. Evaluation of the NASA Quality Surveillance System Pilot in Meeting Requirements for Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2002-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  13. Evaluation Of The NASA Quality Surveillance System Pilot In Meeting Requirements For Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2001-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  14. 48 CFR 32.504 - Subcontracts under prime contracts providing progress payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor shall not delete the references to “Contracting Officer” and “Government” in adapting paragraph (g... “Contracting Officer” may be changed to “Contracting Officer or Prime Contractor.” (ii) The term “the Government” may be changed to “the Government or Prime Contractor.” (3) The subcontract special terms...

  15. 48 CFR 1852.245-73 - Financial reporting of NASA property in the custody of contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... due. However, contractors' procedures must document the process for developing these estimates based... shall have formal policies and procedures, which address the validation of NF 1018 data, including data... validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement...

  16. 48 CFR 1852.245-73 - Financial reporting of NASA property in the custody of contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... due. However, contractors' procedures must document the process for developing these estimates based... shall have formal policies and procedures, which address the validation of NF 1018 data, including data... validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement...

  17. 48 CFR 1852.245-73 - Financial reporting of NASA property in the custody of contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Financial reporting of... CONTRACT CLAUSES Texts of Provisions and Clauses 1852.245-73 Financial reporting of NASA property in the custody of contractors. As prescribed in 1845.106-70(d), insert the following clause: Financial Reporting...

  18. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  19. 75 FR 22805 - Submission for OMB Review; American Recovery and Reinvestment Act-Quarterly Reporting for Prime...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Recovery and Reinvestment Act--Quarterly Reporting for Prime Contractors AGENCIES: Department of Defense... Reinvestment Act--Quarterly Reporting for Prime Contractors published in the Federal Register is being...

  20. The Fifth Annual NASA/Contractors Conference on Quality and Productivity. Quality: A Commitment to the Future

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The report is a summary of the 5th NASA/Contractors Conference on Quality and Productivity. The theme was 'Quality - A Commitment to the Future'. The summary report highlights the key points: commitment to quality, strategic and long-range planning, quality commitment, risk management, teaming, quality measurement, creating a quality environment, contract incentives, software quality and reliability.

  1. Highlights of contractor initiatives in quality enhancement and productivity improvement

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The NASA/Contractor Team efforts are presented as part of NASA's continuing effort to facilitate the sharing of quality and productivity improvement ideas among its contractors. This complilation is not meant to be a comprehensive review of contractor initiative nor does it necessarily express NASA's views. The submissions represent samples from a general survey, and were not edited by NASA. The efforts are examples of quality and productivity programs in private industry, and as such, highlight company efforts in individual areas. Topics range from modernization of equipment, hardware, and technology to management of human resources. Of particular interest are contractor initiatives which deal with measurement and evaluation data pertaining to quality and productivity performance.

  2. Apollo 14 prime crew aboard NASA Motor Vessel Retriever during training

    NASA Image and Video Library

    1970-10-24

    S70-51699 (24 Oct. 1970) --- The prime crew of the Apollo 14 lunar landing mission relaxes aboard the NASA motor vessel retriever, prior to participating in water egress training in the Gulf of Mexico. Left to right are astronauts Alan B. Shepard Jr., commander; Stuart A. Roosa, command module pilot; and Edgar D. Mitchell, lunar module pilot. They are standing by a Command Module (CM) trainer which was used in the exercises.

  3. 2008 NASA Seal/Secondary Air System Workshop

    NASA Technical Reports Server (NTRS)

    Steinetz, Bruce M. (Editor); Hendricks, Robert C. (Editor); Delgado, Irebert R. (Editor)

    2009-01-01

    The 2008 NASA Seal/Secondary Air System Workshop covered the following topics: (i) Overview of NASA s new Orion project aimed at developing a new spacecraft that will fare astronauts to the International Space Station, the Moon, Mars, and beyond; (ii) Overview of NASA s fundamental aeronautics technology project; (iii) Overview of NASA Glenn s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing seal leakage as well as high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Turbine seal development topics covered include a method for fast-acting HPT blade tip clearance control, noncontacting low-leakage seals, intershaft seals, and a review of engine seal performance requirements for current and future Army engine platforms.

  4. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  5. NASA on a Strong Roll in Preparing Space Launch System Flight Engines

    NASA Image and Video Library

    2017-08-09

    NASA is on a roll when it comes to testing engines for its new Space Launch System (SLS) rocket that will send astronauts to deep-space destinations, including Mars. Just two weeks after the third test of a new RS-25 engine flight controller, the space agency recorded its fourth full-duration controller test Aug. 9 at Stennis Space Center near Bay St. Louis, Mississippi. Engineers conducted a 500-second test of the RS-25 engine controller on the A-1 Test Stand at Stennis. The test involved installing the controller on an RS-25 development engine and firing it in the same manner, and for the same length of time, as needed during an actual SLS launch. The test marked another milestone toward launch of the first integrated flight of the SLS rocket and Orion crew vehicle. Exploration Mission-1 will be an uncrewed mission into lunar orbit, designed to provide a final check-out test of rocket and Orion capabilities before astronauts are returned to deep space. The SLS rocket will be powered at launch by four RS-25 engines, providing a combined 2 million pounds of thrust, and with a pair of solid rocket boosters, providing more than 8 million pounds of total thrust. The RS-25 engines for the initial SLS flights are former space shuttle main engines that are now being used to launch the larger and heavier SLS rocket and with the new controller. The controller is a critical component that operates as the engine “brain” that communicates with SLS flight computers to receive operation performance commands and to provide diagnostic data on engine health and status. Engineers conducted early prototype tests at Stennis to collect data for development of the new controller by NASA, RS-25 prime contractor Aerojet Rocketdyne and subcontractor Honeywell. Testing of actual flight controllers began at Stennis in March. NASA is testing all controllers and engines designated for the EM-1 flight at Stennis. It also will test the SLS core stage for the flight at Stennis, which will

  6. The NASA Plan: To award eight percent of prime and subcontracts to socially and economically disadvantaged businesses

    NASA Technical Reports Server (NTRS)

    1990-01-01

    It is NASA's intent to provide small disadvantaged businesses, including women-owned, historically black colleges and universities and minority education institutions the maximum practicable opportunity to receive a fair proportion of NASA prime and subcontracted awards. Annually, NASA will establish socioeconomic procurement goals including small disadvantaged business goals, with a target of reaching the eight percent level by the end of FY 1994. The NASA Associate Administrators, who are responsible for the programs at the various NASA Centers, will be held accountable for full implementation of the socioeconomic procurement plans. Various aspects of this plan, including its history, are discussed.

  7. 2007 NASA Seal/Secondary Air System Workshop. Volume 1

    NASA Technical Reports Server (NTRS)

    Steinetz, Bruce M.; Hendricks, Robert C.; Delgado, Irebert

    2008-01-01

    The 2007 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA's new Orion project aimed at developing a new spacecraft that will fare astronauts to the International Space Station, the Moon, Mars, and beyond; (ii) Overview of NASA's fundamental aeronautics technology project; (iii) Overview of NASA Glenn s seal project aimed at developing advanced seals for NASA's turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing seal leakage as well as high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Turbine seal development topics covered include a method for fast-acting HPT blade tip clearance control, noncontacting low-leakage seals, intershaft seals, and a review of engine seal performance requirements for current and future Army engine platforms.

  8. 48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... Both the electronic and paper versions of NASA Form 1679 may be accessed at the electronic New Technology Reporting Web site http://invention.nasa.gov. (End of addition) (f)(5) The Contractor shall... subparagraph (c)(1). NASA prefers that the contractor use either the electronic or paper version of NASA Form...

  9. 48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... Both the electronic and paper versions of NASA Form 1679 may be accessed at the electronic New Technology Reporting Web site http://invention.nasa.gov. (End of addition) (f)(5) The Contractor shall... subparagraph (c)(1). NASA prefers that the contractor use either the electronic or paper version of NASA Form...

  10. 48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... Both the electronic and paper versions of NASA Form 1679 may be accessed at the electronic New Technology Reporting Web site http://invention.nasa.gov. (End of addition) (f)(5) The Contractor shall... subparagraph (c)(1). NASA prefers that the contractor use either the electronic or paper version of NASA Form...

  11. 48 CFR 32.110 - Payment of subcontractors under cost-reimbursement prime contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... under cost-reimbursement prime contracts. 32.110 Section 32.110 Federal Acquisition Regulations System... Purchase Financing 32.110 Payment of subcontractors under cost-reimbursement prime contracts. If the contractor makes financing payments to a subcontractor under a cost-reimbursement prime contract, the...

  12. Prime Contract Awards Over $25,000 by Major System, Contractor and State Part 1 (AAA-NAVY-AVG NAVY)

    DTIC Science & Technology

    1990-01-01

    Q-COC’) -4 M’i (a -4 c"a(aeo - ( D 0 AC 1 -ao f-.r qva 0(%Ioa.4 ()t a. c~cv(vc4 z *Za in -0f (4Jl w -44- m - .41 C,4 Ui 0 C4 IC4 P- -a l~~II I II cLE E...AO-A236 155iiiilulll l I l 1990 ANNUAL Prime Contract Awards Over $25,000 by Major System, Contractor and State Part 1 (AAA-NAVY-AVG NAVY) WHS...Special . 1 -9 __28284 pages I1 ~ . - e21 M(%I% cm -40W -4 I4 m V .. 4 mt WC)a r a- 4-r w~l w zl- qt qt V .4- 01-4 41-4 . 40 o r Lu V) c I OL 9 C U c

  13. California’s Shrinking Defense Contractors: Effects on Small Suppliers,

    DTIC Science & Technology

    1996-01-01

    They did not physically segregate any parts of their operations or set up a separate data management system to do business with prime contractors...of them out of business . * Small defense aerospace suppliers are not making cutting-edge products for commercial customers. Small defense aerospace...are considered critical to their primes’ supplier base are concerned. Most Firms Are Still in Business When we checked with a random sample of small

  14. OPTIMUS PRIME Challenge Brings Winning Students to NASA Goddard

    NASA Image and Video Library

    2017-12-08

    From June 28 through 30, 2016, the OPTIMUS PRIME Spinoff Promotion and Research Challenge (OPSPARC) gave the contest’s winning students the opportunity to explore NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Three teams of students from elementary, middle and high school won the contest by creating the most popular ideas to use NASA technology in new and innovative ways. The students used an online platform called Glogster to make posters about their ideas, and the general public voted for their favorites. Sophia Sheehan won the elementary school prize for her invention of the “blow coat,” which would be powered by solar panels and blow warm air into winter coats, helping people in her hometown of Chicago stay warm in the winter. Heidi Long, Aubrey Nesti, Katherine Valbuena and Jasmine Wu won in the middle school category for their idea called Tent-cordion, which would use spacesuit and satellite insulation materials in a foldable tent to house refugees and the homeless. Finally, Jake Laddis, Alex Li, Isaac Wecht and Isabel Wecht won in the high school category for their idea to use James Webb Space Telescope sunshield technology to shield houses from summer heat and reduce the need for air conditioning around the world. The high school winners also had the opportunity to compete in the NASA InWorld challenge, sponsored by the James Webb Space Telescope project, and continued developing their idea in a virtual world and gaming environment. During their three-day workshop at Goddard, the students toured the center, met with scientists and engineers, took a look at the James Webb Space Telescope in Goddard’s clean room, and even made their own videos in Goddard’s TV studio. One of the students talked about how the experience inspired her. Read more: go.nasa.gov/298fGdQ

  15. 48 CFR 519.7004 - Incentives for prime contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7004 Incentives for prime...) Costs incurred by a mentor to provide developmental assistance, as described in section 519.7012 to... under a GSA contract. If GSA is the mentor's responsible audit agency under FAR 42.703-1, GSA will...

  16. A Rainbow View of NASA's RS-25 Engine Test

    NASA Image and Video Library

    2017-02-22

    NASA engineers conducted their first RS-25 test of 2017 on the A-1 Test Stand at Stennis Space Center near Bay St. Louis, Mississippi, on Feb. 22, continuing to collect data on the performance of the rocket engine that will help power the new Space Launch System (SLS) rocket. Shown from the viewpoint of an overhead drone, the test of development engine No. 0528 ran the scheduled 380 seconds (six minutes and 20 seconds), allowing engineers to monitor various engine operating conditions. The test represents another step forward in development of the rocket that will launch humans aboard Orion deeper into space than ever before. Four RS-25 engines, together with a pair of solid rocket boosters, will power the SLS at launch on its deep-space missions. The engines for the first four SLS flights are former space shuttle main engines, which were tested extensively at Stennis and are some of the most proven engines in the world. Engineers are conducting an ongoing series of tests this year for SLS on both development and flight engines for future flights to ensure the engine, outfitted with a new controller, can perform at the higher level under a variety of conditions and situations. Stennis is also preparing its B-2 Test Stand to test the core stage for the first SLS flight with Orion, known as Exploration Mission-1. That testing will involve installing the flight stage on the stand and firing its four RS-25 engines simultaneously, just as during an actual launch. The Feb. 22 test was conducted by Aerojet Rocketdyne and Syncom Space Services engineers and operators. Aerojet Rocketdyne is the prime contractor for the RS-25 engines. Syncom Space Services is the prime contractor for Stennis facilities and operations. PAO Name:Kim Henry Phone Number:256-544-1899 Email Address: kimberly.m.henry@nasa.gov

  17. KSC-2010-5283

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer walk through the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  18. KSC-2010-5281

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer walk through the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  19. KSC-2010-5280

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer attend the opening ceremonies of the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  20. KSC-2010-5282

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer walk through the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  1. KSC-2010-5284

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer walk through the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  2. 78 FR 79455 - Information Collection; System for Award Management Registration Requirements for Prime Grant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ...Under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the Regulatory Secretariat Division will be submitting to the Office of Management and Budget (OMB) a request to review and approve a renewal of the currently approved information collection requirement regarding the pre-award registration requirements for Prime Grant Recipients. The title of the approved information collection is Central Contractor Registration Requirements for Prime Grant Recipients (OMB Control Number 3090-0290). The updated information collection title, based on the migration of the Central Contractor Registration system to the System for Award Management in late July 2012, is System for Award Management Registration Requirements for Prime Grant Recipients.

  3. 2005 NASA Seal/Secondary Air System Workshop, Volume 1

    NASA Technical Reports Server (NTRS)

    Steinetz, Bruce M. (Editor); Hendricks, Robert C. (Editor)

    2006-01-01

    The 2005 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of the NASA-sponsored Propulsion 21 Project; (iii) Overview of NASA Glenn s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary "androgynous" seal technologies were reviewed. Researchers also reviewed tests completed for the shuttle main landing gear door seals.

  4. Supplier Assessment System (SAS)

    NASA Technical Reports Server (NTRS)

    Dietrich, Kristen

    2016-01-01

    Background: Sponsored by NASA Headquarters; Charter - provide information to assist the quality assurance community in evaluating and determining supplier risk; Comprehensive on-line repository of supplier information; Available to approved civil service personnel from all NASA Centers, other U.S. Government Agencies, Prime Contractors, and NASA direct support contractors; User access to specific data types or documents is controlled as needed.

  5. The management approach to the NASA space station definition studies at the Manned Spacecraft Center

    NASA Technical Reports Server (NTRS)

    Heberlig, J. C.

    1972-01-01

    The overall management approach to the NASA Phase B definition studies for space stations, which were initiated in September 1969 and completed in July 1972, is reviewed with particular emphasis placed on the management approach used by the Manned Spacecraft Center. The internal working organizations of the Manned Spacecraft Center and its prime contractor, North American Rockwell, are delineated along with the interfacing techniques used for the joint Government and industry study. Working interfaces with other NASA centers, industry, and Government agencies are briefly highlighted. The controlling documentation for the study (such as guidelines and constraints, bibliography, and key personnel) is reviewed. The historical background and content of the experiment program prepared for use in this Phase B study are outlined and management concepts that may be considered for future programs are proposed.

  6. 2004 NASA Seal/Secondary Air System Workshop, Volume 1

    NASA Technical Reports Server (NTRS)

    2005-01-01

    The 2004 NASA Seal/Secondary Air System workshop covered the following topics: (1) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (2) Overview of the NASA-sponsored Ultra-Efficient Engine Technology (UEET) program; (3) Overview of NASA Glenn s seal program aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (4) Reviews of NASA prime contractor and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (5) Reviews of material development programs relevant to advanced seals development. The NASA UEET overview illustrated for the reader the importance of advanced technologies, including seals, in meeting future turbine engine system efficiency and emission goals. For example, the NASA UEET program goals include an 8- to 15-percent reduction in fuel burn, a 15-percent reduction in CO2, a 70-percent reduction in NOx, CO, and unburned hydrocarbons, and a 30-dB noise reduction relative to program baselines. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle, as part of NASA s new Exploration Initiative. Plans to develop the necessary mechanism and androgynous seal technologies were reviewed. Seal challenges posed by reusable re-entry space vehicles include high-temperature operation, resiliency at temperature to accommodate gap changes during operation, and durability to meet mission requirements.

  7. Ground-based plasma contractor characterization

    NASA Technical Reports Server (NTRS)

    Patterson, Michael J.; Aadland, Randall S.

    1987-01-01

    Presented are recent NASA Lewis Research Center (LeRC) plasma contractor experimental results, as well as a description of the plasma contractor test facility. The operation of a 24 cm diameter plasma source with hollow cathode was investigated in the lighted-mode regime of electron current collection from 0.1 to 7.0 A. These results are compared to those obtained with a 12 cm plasma source. Full two-dimensional plasma potential profiles were constructed from emissive probe traces of the contractor plume. The experimentally measured dimensions of the plume sheaths were then compared to those theoretically predicted using a model of a spherical double sheath. Results are consistent for currents up to approximately 1.0 A. For currents above 1.0 A, substantial deviations from theory occur. These deviations are due to sheath asphericity, and possibly volume ionization in the double-sheath region.

  8. Capital Investment Motivational Techniques Used by Prime Contractors on Subcontractors

    DTIC Science & Technology

    1984-12-01

    by block number) Productivity; Profit Policy; Subcontractors; Weighted Guidelines; Profitability; Profit 20. ABSTRACT (Continue on reverse aide If...probably productivity gains that could be made if defense contractors increased their investment [6:39]. A major deterrent to the Weighted Guideline...any profit gained would be offset to some degree by a profit loss from a reduction in profit based on costs . This result is a consequence of the cost

  9. The Eighth Annual NASA/Contractors Conference and 1991 National Symposium on Quality and Productivity: Extending the boundaries of total quality management

    NASA Technical Reports Server (NTRS)

    Templeton, Geoffrey B. (Editor); Stewart, Lynne M. (Editor); Still, William T. (Editor)

    1992-01-01

    The Eighth Annual NASA/Contractors Conference and 1991 National Symposium on Quality and Productivity provided a forum to exchange knowledge and experiences in these areas of continuous improvement. The more than 1,100 attendees from government, industry, academia, community groups, and the international arena had a chance to learn about methods, tools, and strategies for excellence and to discuss continuous improvement strategies, successes, and failures. This event, linked via satellite to concurrent conferences hosted by the NASA Goddard Space Flight Center in Greenbelt, Maryland, and Martin Marietta Astronautics Group in Denver, Colorado, also explored extending the boundaries of Total Quality Management to include partnerships for quality within communities and encouraged examination, evaluation, and change to incorporate the principles of continuous improvement.

  10. 2006 NASA Seal/Secondary Air System Workshop; Volume 1

    NASA Technical Reports Server (NTRS)

    Steinetz, Bruce, M. (Editor); Hendricks, Robert C. (Editor); Delgado, Irebert (Editor)

    2007-01-01

    The 2006 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of NASA s new fundamental aeronautics technology project; (iii) Overview of NASA Glenn Research Center s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing seal leakages as well as high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary "androgynous" seal technologies were reviewed. Researchers also reviewed seal technologies employed by the Apollo command module that serve as an excellent basis for seals for NASA s new Crew Exploration Vehicle (CEV).

  11. Alphabetic List of All DoD Prime Contractors (No Dollars), FY83.

    DTIC Science & Technology

    1983-01-01

    AIRCRAFT PARTS INC UNIVERSAL LINER OF NEW MEXICO INC UNIVERSITY FACULTY ASSOCIATES UNIVERSAL APPLICATORS INC UNIVERSAL LOGISTICS CORP UNIVERSITY MICROFILMS...LTD UNIVERSAL ASPHALT PAVING CO INC UNIVERSAL LUSITANIA MFG CORP UNIVERSITY OF HEALTH SCIENCES THE CONTRACTORS RECEIVING CONTRACTS OF S25,000 OR MORE

  12. Gemini 8 prime and backup crews during press conference

    NASA Image and Video Library

    1966-02-26

    S66-24380 (26 Feb. 1966) --- Gemini-8 prime and backup crews during press conference. Left to right are astronauts David R. Scott, prime crew pilot; Neil A. Armstrong, prime crew command pilot; Charles Conrad Jr., backup crew command pilot; and Richard F. Gordon Jr., backup crew pilot. Photo credit: NASA

  13. Selling to NASA

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The prospective NASA contractor is provided with information that describes the agency and its procurement practices. Products include ideas, manufacturing capabilities, fabricated components, construction, basic materials, and specialized services. NASA assistance in marketing these and other products is emphasized. Small and minority business enterprises are discussed. The agency's scientific and technical information activities are also discussed.

  14. Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

    NASA Technical Reports Server (NTRS)

    Hirshorn, Steven R.

    2017-01-01

    Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

  15. Selling to NASA

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Prospective contractors are acquainted with the organizational structure of NASA, and the major technical program offices and selected staff offices at the Headquarters level are briefly described. The basic procedures for Federal procurement are covered. A primer is presented on how to market to NASA. While the information is specific to NASA, many of the principles are applicable to other agencies as well. Some of the major programs are introduced which are available to small and disadvantaged businesses. The major research programs and fields of interest at individual NASA centers are summarized.

  16. NASA Space Rocket Logistics Challenges

    NASA Technical Reports Server (NTRS)

    Neeley, James R.; Jones, James V.; Watson, Michael D.; Bramon, Christopher J.; Inman, Sharon K.; Tuttle, Loraine

    2014-01-01

    The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discreet programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as commonality especially problematic. Additionally, a very low manifest rate of one flight every four years makes logistics comparatively expensive. That, along with the SLS architecture being developed using a block upgrade evolutionary approach, exacerbates long-range planning for supportability considerations. These common and unique logistics challenges must be clearly identified and tackled to allow SLS to have a successful program. This paper will address the common and unique challenges facing the SLS programs, along with the analysis and decisions the NASA Logistics engineers are making to mitigate the threats posed by each.

  17. 76 FR 11363 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... management and oversight of a program or effort (rather than to directly furnish an end item or service to... prime contractor or any such first-tier subcontractor in furnishing end items or services of the type.... 2320, which applies to technical data, but not to computer software (which is expressly excluded from...

  18. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    NASA Technical Reports Server (NTRS)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent

  19. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Information from NASA's Tech Transfer Office is on display at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  20. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Attendees speak to representatives from NASA's Office of Small Business Programs during Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  1. 14 CFR 1245.301 - Inventions under NASA contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Inventions under NASA contracts. 1245.301... INTELLECTUAL PROPERTY RIGHTS NASA Foreign Patent Program § 1245.301 Inventions under NASA contracts. (a) Pursuant to § 1245.113, NASA has facilitated the filing of foreign patent applications by contractors by...

  2. 14 CFR 1245.301 - Inventions under NASA contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Inventions under NASA contracts. 1245.301... INTELLECTUAL PROPERTY RIGHTS NASA Foreign Patent Program § 1245.301 Inventions under NASA contracts. (a) Pursuant to § 1245.113, NASA has facilitated the filing of foreign patent applications by contractors by...

  3. 14 CFR 1245.301 - Inventions under NASA contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Inventions under NASA contracts. 1245.301... INTELLECTUAL PROPERTY RIGHTS NASA Foreign Patent Program § 1245.301 Inventions under NASA contracts. (a) Pursuant to § 1245.113, NASA has facilitated the filing of foreign patent applications by contractors by...

  4. 14 CFR 1245.301 - Inventions under NASA contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Inventions under NASA contracts. 1245.301... INTELLECTUAL PROPERTY RIGHTS NASA Foreign Patent Program § 1245.301 Inventions under NASA contracts. (a) Pursuant to § 1245.113, NASA has facilitated the filing of foreign patent applications by contractors by...

  5. The role of NASA for aerospace information

    NASA Technical Reports Server (NTRS)

    Chandler, G. P., Jr.

    1980-01-01

    The NASA Scientific and Technical Information Program operations are performed by two contractor operated facilities. The NASA STI Facility, located near Baltimore, Maryland, employs about 210 people who process report literature, operate the computer complex, and provide support for software maintenance and developments. A second contractor, the Technical Information Services of the American Institute of Aeronautics and Astronautics, employs approximately 80 people in New York City and processes the open literature such as journals, magazines, and books. Features of these programs include online access via RECON, announcement services, and international document exchange.

  6. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification is...

  7. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification is...

  8. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification is...

  9. NASA/ORNL/AFRL Project Work on EBM LSHR: Additive Manufacturing of High-Temperature Gamma-Prime Strengthened Ni-Based Superalloys

    NASA Technical Reports Server (NTRS)

    Sudbrack, Chantal K.; Kirka, Michael M.; Dehoff, Ryan R.; Carter, Robert W.; Semiatin, Sheldon L.; Gabb, Timothy P.

    2016-01-01

    Powder-bed fabrication of aerospace alloys may revolutionize production by eliminating the need for extensive machining and expensive tooling. Heated-bed electron-beam melting (EBM) offers advantages over non-heated laser additive manufacturing (AM) methods, including lower residual stress, reduced risk of contamination, slower cooling rates, and faster build times. NASA Glenn Research Center has joint project work with Oak Ridge National Lab and the Air Force Research Laboratory to explore the feasibility of fabricating advanced Ni-based gamma-prime superalloys with EBM AM.

  10. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  11. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  12. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  13. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  14. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (MAY 2009) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  15. Contractor evaluations in the contractor selection process.

    DOT National Transportation Integrated Search

    2014-04-01

    The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...

  16. NASA safety manual. Volume 9: Fire protection

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Requirements are identified and guidelines are provided for implementing a comprehensive fire protection program. These requirements and guidelines are applicable to NASA headquarters and field installations. Portions also can be applied to NASA contractor operations within the scope of the contract.

  17. 48 CFR 1845.7101 - Instructions for preparing NASA Form 1018.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... NASA Form 1018. 1845.7101 Section 1845.7101 Federal Acquisition Regulations System NATIONAL AERONAUTICS... Instructions for preparing NASA Form 1018. NASA must account for and report assets in accordance with 31 U.S.C...) instructions. Since contractors maintain NASA's official records for its assets in their possession, NASA must...

  18. 48 CFR 1845.7101 - Instructions for preparing NASA Form 1018.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... NASA Form 1018. 1845.7101 Section 1845.7101 Federal Acquisition Regulations System NATIONAL AERONAUTICS... Instructions for preparing NASA Form 1018. NASA must account for and report assets in accordance with 31 U.S.C...) instructions. Since contractors maintain NASA's official records for its assets in their possession, NASA must...

  19. 48 CFR 1845.7101 - Instructions for preparing NASA Form 1018.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... NASA Form 1018. 1845.7101 Section 1845.7101 Federal Acquisition Regulations System NATIONAL AERONAUTICS... Instructions for preparing NASA Form 1018. NASA must account for and report assets in accordance with 31 U.S.C...) instructions. Since contractors maintain NASA's official records for its assets in their possession, NASA must...

  20. 48 CFR 1845.7101 - Instructions for preparing NASA Form 1018.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... NASA Form 1018. 1845.7101 Section 1845.7101 Federal Acquisition Regulations System NATIONAL AERONAUTICS... Instructions for preparing NASA Form 1018. NASA must account for and report assets in accordance with 31 U.S.C...) instructions. Since contractors maintain NASA's official records for its assets in their possession, NASA must...

  1. 48 CFR 1845.7101 - Instructions for preparing NASA Form 1018.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... NASA Form 1018. 1845.7101 Section 1845.7101 Federal Acquisition Regulations System NATIONAL AERONAUTICS... Instructions for preparing NASA Form 1018. NASA must account for and report assets in accordance with 31 U.S.C...) instructions. Since contractors maintain NASA's official records for its assets in their possession, NASA must...

  2. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with its...

  3. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with its...

  4. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with its...

  5. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with its...

  6. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with its...

  7. Strategic Management of Resource Markets: An Exploratory Study of Department of Defense Contractors.

    DTIC Science & Technology

    1982-04-01

    prime contractors focusing on (1) the operation and functional content of strategic management systems and their approaches to identifying, prioritizing...Introduction Strategic Planning for Procurement Approaches to Strategic Planning Relationship with the Procurement Process Organizational Demands Studies...planning/management with the same skill, content and commitment, what suggested improvements can come from a study of the approaches used by the more

  8. 48 CFR 1823.7001 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA solicitation..., RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 1823.7001 NASA..., astronauts and pilots, the NASA workforce (including contractor employees working on NASA contracts), or high...

  9. 48 CFR 1823.7001 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA solicitation..., RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 1823.7001 NASA..., astronauts and pilots, the NASA workforce (including contractor employees working on NASA contracts), or high...

  10. 48 CFR 1823.7001 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation..., RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 1823.7001 NASA..., astronauts and pilots, the NASA workforce (including contractor employees working on NASA contracts), or high...

  11. 48 CFR 1823.7001 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA solicitation..., RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 1823.7001 NASA..., astronauts and pilots, the NASA workforce (including contractor employees working on NASA contracts), or high...

  12. 48 CFR 1823.7001 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA solicitation..., RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 1823.7001 NASA..., astronauts and pilots, the NASA workforce (including contractor employees working on NASA contracts), or high...

  13. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Exhibitors answer questions at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  14. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    An exhibitor answers questions at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  15. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Attendees visit exhibitor booths at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  16. NASA Automatic Information Security Handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This handbook details the Automated Information Security (AIS) management process for NASA. Automated information system security is becoming an increasingly important issue for all NASA managers and with rapid advancements in computer and network technologies and the demanding nature of space exploration and space research have made NASA increasingly dependent on automated systems to store, process, and transmit vast amounts of mission support information, hence the need for AIS systems and management. This handbook provides the consistent policies, procedures, and guidance to assure that an aggressive and effective AIS programs is developed, implemented, and sustained at all NASA organizations and NASA support contractors.

  17. NASA Space Flight Vehicle Fault Isolation Challenges

    NASA Technical Reports Server (NTRS)

    Bramon, Christopher; Inman, Sharon K.; Neeley, James R.; Jones, James V.; Tuttle, Loraine

    2016-01-01

    The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discrete programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as testability of the integrated flight vehicle especially problematic. The cost of fully automated diagnostics can be completely justified for a large fleet, but not so for a single flight vehicle. Fault detection is mandatory to assure the vehicle is capable of a safe launch, but fault isolation is another issue. SLS has considered various methods for fault isolation which can provide a reasonable balance between adequacy, timeliness and cost. This paper will address the analyses and decisions the NASA Logistics engineers are making to mitigate risk while providing a reasonable testability solution for fault isolation.

  18. Microgravity Impact Experiments: The Prime Campaign on the NASA KC-135

    NASA Astrophysics Data System (ADS)

    Colwell, Joshua E.; Sture, Stein; Lemos, Andreas R.

    2002-11-01

    Low velocity collisions (v less than 100 m/s) occur in a number of astrophysical contexts, including planetary rings, protoplanetary disks, the Kuiper belt of comets, and in secondary cratering events on asteroids and planetary satellites. In most of these situations the surface gravity of the target is less than a few per cent of 1 g. Asteroids and planetary satellites are observed to have a regolith consisting of loose, unconsolidated material. Planetary ring particles likely are also coated with dust based on observations of dust within ring systems. The formation of planetesimals in protoplanetary disks begins with the accretion of dust particles. The response of the surface dust layer to collisions in the near absence of gravity is necessary for understanding the evolution of these systems. The Collisions Into Dust Experiment (COLLIDE) performs six impact experiments into simulated regolith in microgravity conditions on the space shuttle. The parameter space to be explored is quite large, including effects such as impactor mass and velocity, impact angle, target porosity, size distribution, and particle shape. We have developed an experiment, the Physics of Regolith Impacts in Microgravity Experiment (PRIME), that is analogous to COLLIDE that is optimized for flight on the NASA KC-135 reduced gravity aircraft. The KC-135 environment provides the advantage of more rapid turnover between experiments, allowing a broader range of parameters to be studied quickly, and more room for the experiment so that more impact experiments can be performed each flight. The acceleration environment of the KC-135 is not as stable and minimal as on the space shuttle, and this requires impact velocities to be higher than the minimum achievable with COLLIDE. The experiment consists of an evacuated PRIME Impact Chamber (PIC) with an aluminum base plate and acrylic sides and top. A target tray, launcher, and mirror mount to the base plate. The launcher may be positioned to allow for

  19. 48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Technology Reporting Web site http://invention.nasa.gov. (End of addition) (f)(5) The Contractor shall... of tier, for experimental, developmental, research, design, or engineering work to be performed by...

  20. 75 FR 17919 - Submission for OMB Review; American Recovery and Reinvestment Act-Quarterly Reporting for Prime...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Recovery and Reinvestment Act--Quarterly Reporting for Prime Contractors AGENCY: Department of Defense (DOD... cumulative amount from all the reports submitted for this action will be maintained by the government's on...

  1. NASA Excellence Award for Quality and Productivity 1989 highlights. The 1989 recipient: Lockheed Engineering and Sciences Company

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The NASA Excellence Award for Productivity and Quality is the result of NASA's desire to encourage superior quality and the continuous improvement philosophy in the aerospace industry. It is awarded to NASA contractors, subcontractors, and suppliers who have demonstrated sustained excellence, customer orientation, and outstanding achievements in a total quality management (TQM) environment. The 'highlights' booklet is intended to transfer successful techniques demonstrated by the performance and quality of major NASA contractors.

  2. Mission Planning and Scheduling System for NASA's Lunar Reconnaissance Mission

    NASA Technical Reports Server (NTRS)

    Garcia, Gonzalo; Barnoy, Assaf; Beech, Theresa; Saylor, Rick; Cosgrove, Jennifer Sager; Ritter, Sheila

    2009-01-01

    In the framework of NASA's return to the Moon efforts, the Lunar Reconnaissance Orbiter (LRO) is the first step. It is an unmanned mission to create a comprehensive atlas of the Moon's features and resources necessary to design and build a lunar outpost. LRO is scheduled for launch in April, 2009. LRO carries a payload comprised of six instruments and one technology demonstration. In addition to its scientific mission LRO will use new technologies, systems and flight operations concepts to reduce risk and increase productivity of future missions. As part of the effort to achieve robust and efficient operations, the LRO Mission Operations Team (MOT) will use its Mission Planning System (MPS) to manage the operational activities of the mission during the Lunar Orbit Insertion (LOI) and operational phases of the mission. The MPS, based on GMV's flexplan tool and developed for NASA with Honeywell Technology Solutions (prime contractor), will receive activity and slew maneuver requests from multiple science operations centers (SOC), as well as from the spacecraft engineers. flexplan will apply scheduling rules to all the requests received and will generate conflict free command schedules in the form of daily stored command loads for the orbiter and a set of daily pass scripts that help automate nominal real-time operations.

  3. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    John Murray, chief executive officer of the Canaveral Port Authority, welcomes participants to the Kennedy Space Center's 27th Business Opportunities Expo at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  4. Nasa's Emerging Productivity Program

    NASA Technical Reports Server (NTRS)

    Braunstein, D. R.

    1984-01-01

    The goals, membership, and organizational structure of the NASA Productivity Steering Committee are described as well as steps taken to make NASA a leader in the development and application of productivity and quality concepts at every level of agency management. The overall strategy for the Productivity Improvement and Quality Enhancement (PIQE) Program is through employee involvement, both civil servant and contractor, in all phases of agency-wide activity. Elements of the PIQE program and initial thrusts are examined.

  5. Process Product Integrity Audits: A Hardware Auditing Technique for the '90s'

    NASA Technical Reports Server (NTRS)

    Taylor, Mike

    1994-01-01

    The Space Shuttle program has experienced hardware problems that have delayed several shuttle launches. A NASA review determined that the problems could have been prevented. NASA further concluded that a new kind of Quality emphasis at all Space Shuttle prime contractors and subcontractors was necessary to ensure mission success. To meet this challenge, NASA initiated an innovative review process called Process/Product Integrity (PPIA).

  6. 48 CFR 1845.107-70 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA solicitation... NASA solicitation provisions and contract clauses. (a)(1) The contracting officer shall insert the... Government property is to be made available to a contractor working on a NASA installation, and the...

  7. 48 CFR 1845.107-70 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA solicitation... NASA solicitation provisions and contract clauses. (a)(1) The contracting officer shall insert the... Government property is to be made available to a contractor working on a NASA installation, and the...

  8. 48 CFR 1845.107-70 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA solicitation... NASA solicitation provisions and contract clauses. (a)(1) The contracting officer shall insert the... Government property is to be made available to a contractor working on a NASA installation, and the...

  9. 48 CFR 1845.107-70 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation... NASA solicitation provisions and contract clauses. (a)(1) The contracting officer shall insert the... Government property is to be made available to a contractor working on a NASA installation, and the...

  10. NASA Goddard All Hands Meeting

    NASA Image and Video Library

    2017-12-08

    Monday, September 30, 2013 - NASA Goddard civil servant and contractor employees were invited to an all hands meeting with Center Director Chris Scolese and members of the senior management team to learn the latest information about a possible partial government shutdown that could happen as early as midnight. Credit: NASA/Goddard/Bill Hrybyk NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  11. 48 CFR 1845.106-70 - NASA contract clauses and solicitation provision.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA contract clauses and... AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 1845.106-70 NASA contract... solicitations and contracts when Government property is to be made available to a contractor working on a NASA...

  12. The Shuttle processing contractors (SPC) reliability program at the Kennedy Space Center - The real world

    NASA Astrophysics Data System (ADS)

    McCrea, Terry

    The Shuttle Processing Contract (SPC) workforce consists of Lockheed Space Operations Co. as prime contractor, with Grumman, Thiokol Corporation, and Johnson Controls World Services as subcontractors. During the design phase, reliability engineering is instrumental in influencing the development of systems that meet the Shuttle fail-safe program requirements. Reliability engineers accomplish this objective by performing FMEA (failure modes and effects analysis) to identify potential single failure points. When technology, time, or resources do not permit a redesign to eliminate a single failure point, the single failure point information is formatted into a change request and presented to senior management of SPC and NASA for risk acceptance. In parallel with the FMEA, safety engineering conducts a hazard analysis to assure that potential hazards to personnel are assessed. The combined effort (FMEA and hazard analysis) is published as a system assurance analysis. Special ground rules and techniques are developed to perform and present the analysis. The reliability program at KSC is vigorously pursued, and has been extremely successful. The ground support equipment and facilities used to launch and land the Space Shuttle maintain an excellent reliability record.

  13. NASA scientific and technical program: User survey

    NASA Technical Reports Server (NTRS)

    Hunter, Judy F.; Shockley, Cynthia W.

    1993-01-01

    Results are presented of an intensive user requirements survey conducted by NASA's Scientific and Technical Information (STI) Program with the goal of improving the foundation for the user outreach program. The survey was carried out by interviewing 550 NASA scientists, engineers, and contractors and by analyzing 650 individual responses to a mailed out questionnaire. To analyze the user demographic data, a data base was built and used, and will be applied to ongoing analysis by the NASA STI Program.

  14. NEIS (NASA Environmental Information System)

    NASA Technical Reports Server (NTRS)

    Cook, Beth

    1995-01-01

    The NASA Environmental Information System (NEIS) is a tool to support the functions of the NASA Operational Environment Team (NOET). The NEIS is designed to provide a central environmental technology resource drawing on all NASA centers' capabilities, and to support program managers who must ultimately deliver hardware compliant with performance specifications and environmental requirements. The NEIS also tracks environmental regulations, usages of materials and processes, and new technology developments. It has proven to be a useful instrument for channeling information throughout the aerospace community, NASA, other federal agencies, educational institutions, and contractors. The associated paper will discuss the dynamic databases within the NEIS, and the usefulness it provides for environmental compliance efforts.

  15. The NASA SBIR product catalog

    NASA Technical Reports Server (NTRS)

    Gilman, J. A.; Paige, J. B.; Schwenk, F. Carl

    1992-01-01

    The purpose of this catalog is to assist small business firms in making the community aware of products emerging from their efforts in the Small Business Innovation Research (SBIR) program. It contains descriptions of some products that have advanced into Phase 3 and others that are identified as prospective products. Both lists of products in this catalog are based on information supplied by NASA SBIR contractors in responding to an invitation to be represented in this document. Generally, all products suggested by the small firms were included in order to meet the goals of information exchange for SBIR results. Of the 444 SBIR contractors NASA queried, 137 provided information on 219 products. The catalog presents the product information in the technology areas listed in the table of contents. Within each area, the products are listed in alphabetical order by product name and are given identifying numbers. Also included is an alphabetical listing of the companies that have products described. This listing cross-references the product list and provides information on the business activity of each firm. In addition, there are three indexes: one a list of firms by states, one that lists the products according to NASA Centers that managed the SBIR projects, and one that lists the products by the relevant Technical Topics utilized in NASA's annual program solicitation under which each SBIR project was selected.

  16. Development of Advanced Environmental Barrier Coatings for SiC/SiC Composites at NASA GRC: Prime-Reliant Design and Durability Perspectives

    NASA Technical Reports Server (NTRS)

    Zhu, Dongming

    2017-01-01

    Environmental barrier coatings (EBCs) are considered technologically important because of the critical needs and their ability to effectively protect the turbine hot-section SiC/SiC ceramic matrix composite (CMC) components in harsh engine combustion environments. The development of NASA's advanced environmental barrier coatings have been aimed at significantly improved the coating system temperature capability, stability, erosion-impact, and CMAS resistance for SiC/SiC turbine airfoil and combustors component applications. The NASA environmental barrier coating developments have also emphasized thermo-mechanical creep and fatigue resistance in simulated engine heat flux and environments. Experimental results and models for advanced EBC systems will be presented to help establishing advanced EBC composition design methodologies, performance modeling and life predictions, for achieving prime-reliant, durable environmental coating systems for 2700-3000 F engine component applications. Major technical barriers in developing environmental barrier coating systems and the coating integration with next generation composites having further improved temperature capability, environmental stability, EBC-CMC fatigue-environment system durability will be discussed.

  17. 75 FR 6669 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ...' Purchasing Systems Reviews AGENCIES: Department of Defense (DOD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Notice of request for public comments... collection requirement concerning contractors' purchasing systems reviews. A request for public comments was...

  18. Inactivation of the ribonucleoside triphosphate reductase from Lactobacillus leichmannii by 2 prime -chloro-2 prime -deoxyuridine 5 prime -triphosphate: A 3 prime -2 prime hydrogen transfer during the formation of 3 prime -keto-2 prime -deoxyuridine 5 prime -triphosphate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashley, G.W.; Harris, G.; Stubbe, J.

    1988-10-04

    The ribonucleoside triphosphate reductase of Lactobacillus leichmannii converts the substrate analogue 2{prime}-chloro-2{prime}-deoxyuridine 5{prime}-triphosphate (C1UTP) into a mixture of 2{prime}-deoxyuridine triphosphate (dUTP) and the unstable product 3{prime}-keto-2{prime}-deoxyuridine triphosphate (3{prime}-keto-dUTP). This ketone can be trapped by reduction with NaBH{sub 4}, producing a 4:1 mixture of xylo-dUTP and dUTP. When (3{prime}-{sup 3}H)C1UTP is treated with enzyme in the presence of NaBH{sub 4}, the isomeric deoxyuridines isolated after alkaline phosphatase treatment retained 15% of the {sup 3}H in C1UTP. Degradation of these isomeric nucleosides has established the location of the {sup 3}H in 3{prime}-keto-dUTP as predominantly 2{prime}(S). The xylo-dU had 98.6% of its labelmore » at the 2{prime}(S) position and 1.5% at 2{prime}(R). The isolated dU had 89.6% of its label at 2{prime}(S) and 1.4% at 2{prime}(R), with the remaining 9% label inferred to be at the 3{prime}-carbon, this resulting from the direct enzymic production of dUTP. These results are consistent with enzymic production of a 1:1,000 mixture of dUTP and 3{prime}-keto-dUTP, where the 3{prime}-hydrogen of C1UTP is retained at 3{prime} during production of dUTP and is transferred to 2{prime}(S) during production of 3{prime}-keto-dUTP. The implications of these results and the unique role of the cofactor adenosylcobalamin are discussed in terms of reductase being a model for the B{sub 12}-dependent rearrangement reactions.« less

  19. 48 CFR 1850.403-1 - Indemnification requests. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Indemnification requests. (NASA supplements paragraph (a)) 1850.403-1 Section 1850.403-1 Federal Acquisition Regulations System... Residual Powers 1850.403-1 Indemnification requests. (NASA supplements paragraph (a)) (a) Contractor...

  20. 48 CFR 1850.403-1 - Indemnification requests. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Indemnification requests. (NASA supplements paragraph (a)) 1850.403-1 Section 1850.403-1 Federal Acquisition Regulations System... Residual Powers 1850.403-1 Indemnification requests. (NASA supplements paragraph (a)) (a) Contractor...

  1. George M. Low Trophy: NASA's quality and excellence award

    NASA Technical Reports Server (NTRS)

    1991-01-01

    NASA's major goal is the preservation of America's position as a leader in the aerospace industry. To maintain that status, it is crucial that the products and services we depend upon from NASA contractors, subcontractors, and suppliers meet the highest quality standards to ensure the space program's success. The George M. Low Trophy: NASA's Quality and Excellence Award is the result of NASA's desire to encourage continuous improvement and Total Quality Management (TQM) in the aerospace industry and is awarded to members of NASA's contractor community that have demonstrated sustained excellence, customer orientation, and outstanding achievements in a Total Quality Management (TQM) environment. The purpose in presenting this award is to increase public awareness of the importance of quality and productivity to the nation's aerospace industry and the nation's leadership position overall; encourage domestic business to continuously pursue efforts that enhance quality and increase productivity which will strengthen the nation's competitiveness in the international arena; and provide a forum for sharing the successful techniques and strategies used by applicants with other American organizations. Awards to Rockwell International and Marotta Scientific Controls, Inc. are announced and discussed.

  2. Technical publications of the NASA Wallops Flight Facility, 1980 through 1983

    NASA Technical Reports Server (NTRS)

    Foster, J. N.

    1984-01-01

    This bibliography lists the publications sponsored by the NASA Wallops Flight Center/NASA Goddard Space Flight Center, Wallops Flight Facility during the period 1980 through 1983. The compilation contains citations listed by type of publication; i.e., NASA formal report, NASA contractor report, journal article, or presentation; by contract/grant number; and by accession number. Oceanography, astrophysics, artificial satellites, fluid mechanics, and sea ice are among the topics covered.

  3. Skylab 2 prime crew suit up during prelaunch training activity

    NASA Image and Video Library

    1973-05-08

    S73-25399 (8 May 1973) --- Astronaut Paul J. Weitz, prime crew pilot of the first manned Skylab mission, is suited up in Bldg. 5 at Johnson Space Center (JSC) during prelaunch training activity. He is assisted by astronaut Charles Conrad, Jr., prime crew commander. The man in the left background is wearing a face mask to insure that Conrad, Joseph Kerwin and Weitz are not exposed to disease prior to launch. Photo credit: NASA

  4. Productivity improvement and quality enhancement at NASA

    NASA Technical Reports Server (NTRS)

    Braunstein, D. R.

    1985-01-01

    NASA's Productivity Improvement and Quality Enhancement (PIQE) effort has as its objectives the encouragement of greater employee participation in management decision-making and the identification of impediments as well as opportunities for high productivity. Attempts are also made to try out novel management practices, and to evolve productivity trend analysis techniques. Every effort is made to note, reward, and diffuse successfully instituted PIQE approaches throughout the NASA-contractor organization.

  5. Associative and repetition priming with the repeated masked prime technique: no priming found.

    PubMed

    Avons, S E; Russo, Riccardo; Cinel, Caterina; Verolini, Veronica; Glynn, Kevin; McDonald, Rebecca; Cameron, Marie

    2009-01-01

    Wentura and Frings (2005) reported evidence of subliminal categorical priming on a lexical decision task, using a new method of visual masking in which the prime string consisted of the prime word flanked by random consonants and random letter masks alternated with the prime string on successive refresh cycles. We investigated associative and repetition priming on lexical decision, using the same method of visual masking. Three experiments failed to show any evidence of associative priming, (1) when the prime string was fixed at 10 characters (three to six flanking letters) and (2) when the number of flanking letters were reduced or absent. In all cases, prime detection was at chance level. Strong associative priming was observed with visible unmasked primes, but the addition of flanking letters restricted priming even though prime detection was still high. With repetition priming, no priming effects were found with the repeated masked technique, and prime detection was poor but just above chance levels. We conclude that with repeated masked primes, there is effective visual masking but that associative priming and repetition priming do not occur with experiment-unique prime-target pairs. Explanations for this apparent discrepancy across priming paradigms are discussed. The priming stimuli and prime-target pairs used in this study may be downloaded as supplemental materials from mc.psychonomic-journals.org/content/supplemental.

  6. KSC-2012-3111

    NASA Image and Video Library

    2012-05-23

    CAPE CANAVERAL, Fla. – Joanne Maguire, executive vice president of Space Systems for Lockheed Martin, and Kennedy Space Center Director Bob Cabana, far right, are accompanied by Lockheed Martin and NASA personnel during a tour of Kennedy's Operations and Checkout Building. Lockheed Martin is the prime contractor to NASA for the Orion Multi-Purpose Crew Vehicle, which will be processed in the refurbished Operations and Checkout building. For more information, visit http://www.nasa.gov/exploration/systems/ground. Photo credit: NASA/Jim Grossmann

  7. KSC-2012-3112

    NASA Image and Video Library

    2012-05-23

    CAPE CANAVERAL, Fla. – Lockheed Martin and NASA personnel accompany Joanne Maguire, executive vice president of Space Systems for Lockheed Martin, and Kennedy Space Center Director Bob Cabana, far right, during a tour of Kennedy's Operations and Checkout Building. Lockheed Martin is the prime contractor to NASA for the Orion Multi-Purpose Crew Vehicle, which will be processed in the refurbished Operations and Checkout building. For more information, visit http://www.nasa.gov/exploration/systems/ground. Photo credit: NASA/Jim Grossmann

  8. Development of an Outreach Program for NASA: "NASA Ambassadors"

    NASA Technical Reports Server (NTRS)

    Lebo, George

    1998-01-01

    The NASA Ambassadors Program is designed to present the excitement and importance of NASA's programs to its customers, the general public. Those customers, which are identified in the "Science Communications Strategy" developed by the Space Sciences Laboratory at the MSFC, are divided into three categories: (1) Not interested and not knowledgeable; (2) Interested but not knowledgeable; and (3) Science attentive. In it they recognize that it makes the most sense to attempt to communicate with those described in the last two categories. However, their plan suggests that the media and the educational institutions are the only means of outreach. The NASA Ambassadors Program allows NASA to reach its target audience directly. Steps to be taken in order for the program to commence: (1) MSFC chooses to support the NASA Ambassadors Program - decision point; (2) Designate an "Office In Charge". (3) Assign the "Operation" phase to in-house MSFC personnel or to a contractor - decision point; (4) Name a point of contact; (5) Identify partners in the program and enlist their assistance; (6) Process an unsolicited proposal from an outside source to accomplish those tasks which MSFC chooses to out-source.

  9. NASA Parts Selection List (NPSL) WWW Site http://nepp.nasa.gov/npsl

    NASA Technical Reports Server (NTRS)

    Brusse, Jay

    2000-01-01

    The NASA Parts Selection List (NPSL) is an on-line resource for electronic parts selection tailored for use by spaceflight projects. The NPSL provides a list of commonly used electronic parts that have a history of satisfactory use in spaceflight applications. The objective of this www site is to provide NASA projects, contractors, university experimenters, et al with an easy to use resource that provides a baseline of electronic parts from which designers are encouraged to select. The NPSL is an ongoing resource produced by Code 562 in support of the NASA HQ funded NASA Electronic Parts and Packaging (NEPP) Program. The NPSL is produced as an electronic format deliverable made available via the referenced www site administered by Code 562. The NPSL does not provide information pertaining to patented or proprietary information. All of the information contained in the NPSL is available through various other public domain resources such as US Military procurement specifications for electronic parts, NASA GSFC's Preferred Parts List (PPL-21), and NASA's Standard Parts List (MIL-STD975).

  10. NASA/FAA North Texas Research Station Overview

    NASA Technical Reports Server (NTRS)

    Borchers, Paul F.

    2012-01-01

    NTX Research Staion: NASA research assets embedded in an interesting operational air transport environment. Seven personnel (2 civil servants, 5 contractors). ARTCC, TRACON, Towers, 3 air carrier AOCs(American, Eagle and Southwest), and 2 major airports all within 12 miles. Supports NASA Airspace Systems Program with research products at all levels (fundamental to system level). NTX Laboratory: 5000 sq ft purpose-built, dedicated, air traffic management research facility. Established data links to ARTCC, TRACON, Towers, air carriers, airport and NASA facilities. Re-configurable computer labs, dedicated radio tower, state-of-the-art equipment.

  11. NASA's Exploration Technology Development Program Energy Storage Project Battery Technology Development

    NASA Technical Reports Server (NTRS)

    Reid, Concha M.; Miller, Thomas B.; Mercer, Carolyn R.; Jankovsky, Amy L.

    2010-01-01

    Technical Interchange Meeting was held at Saft America s Research and Development facility in Cockeysville, Maryland on Sept 28th-29th, 2010. The meeting was attended by Saft, contractors who are developing battery component materials under contracts awarded through a NASA Research Announcement (NRA), and NASA. This briefing presents an overview of the components being developed by the contractor attendees for the NASA s High Energy (HE) and Ultra High Energy (UHE) cells. The transition of the advanced lithium-ion cell development project at NASA from the Exploration Technology Development Program Energy Storage Project to the Enabling Technology Development and Demonstration High Efficiency Space Power Systems Project, changes to deliverable hardware and schedule due to a reduced budget, and our roadmap to develop cells and provide periodic off-ramps for cell technology for demonstrations are discussed. This meeting gave the materials and cell developers the opportunity to discuss the intricacies of their materials and determine strategies to address any particulars of the technology.

  12. Got a Minute? Tune Your iPad to NASA's Best

    NASA Astrophysics Data System (ADS)

    Leon, N.; Fitzpatrick, A. J.; Fisher, D. K.; Netting, R. A.

    2012-12-01

    Space Place Prime is a content presentation app for the iPad. It gathers some of the best and most recent web offerings from NASA. A spinoff of NASA's popular kids' website The Space Place (spaceplace.nasa.gov or science.nasa.gov/kids), Space Place Prime taps timely educational and easy-to-read articles from the website, as well as daily updates of NASA space and Earth images and the latest informative videos, including Science Casts and the monthly "What's up in the Sky." Space Place Prime targets a multigenerational audience, including anyone with an interest in NASA and science in general. Features are offered for kids, teachers, parents, space enthusiasts, and everyone in between. The app can be the user's own NASA news source. Like a newspaper or magazine app, Space Place Prime downloads new content daily via wireless connection. In addition to the Space Place website, several NASA RSS feeds are tapped to provide new content. Content is retained for the previous several days or some number of editions of each feed. All content is controlled on the server side, so we can push features about the latest news or change any content without updating the app in the Apple Store. The Space Place Prime interface is a virtual endless grid of small images with short titles, each image a link to an image, video, article, or hands-on activity for kids. The grid can be dragged in any direction with no boundaries. (Image links repeat to fill in the grid "infinitely.") For a more focused search, a list mode presents menus of images, videos, and articles (including activity articles) separately. If the user tags a page (image, video, or article) as a Favorite, the content is downloaded and maintained on the device, and remains permanently available regardless of connectivity. (Very large video files are permanently retained on the server side, however, rather than taking up the limited storage on the iPad.) Facebook, twitter, and e-mail connections make any feature easy to

  13. A Model for NASA-KSC's Privatization Transition

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.; Krumwiede, Dennis W.; Flowers, Jean

    1996-01-01

    This paper describes a model for government agencies that are considering privatization of all or part of their functions. Privatization encompasses the transitioning of government functions from government run to contractor run. The model developed in this paper is used to analyze the National Aeronautics and Space Administration's (NASA) decision to privatize space shuttle operations at the Kennedy Space Center (KSC). Several specific recommendations are given to KSC as they attempt to operationalize this privatization decision at the Center and to transition to a new relationship with their contractors.

  14. 48 CFR 1845.607-2 - Recovering precious metals. (NASA supplements paragraph (b)).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Recovering precious metals. (NASA supplements paragraph (b)). 1845.607-2 Section 1845.607-2 Federal Acquisition Regulations System..., Redistribution, and Disposal of Contractor Inventory 1845.607-2 Recovering precious metals. (NASA supplements...

  15. 48 CFR 1845.607-2 - Recovering precious metals. (NASA supplements paragraph (b)).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Recovering precious metals. (NASA supplements paragraph (b)). 1845.607-2 Section 1845.607-2 Federal Acquisition Regulations System..., Redistribution, and Disposal of Contractor Inventory 1845.607-2 Recovering precious metals. (NASA supplements...

  16. 48 CFR 1845.607-2 - Recovering precious metals. (NASA supplements paragraph (b)).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Recovering precious metals. (NASA supplements paragraph (b)). 1845.607-2 Section 1845.607-2 Federal Acquisition Regulations System..., Redistribution, and Disposal of Contractor Inventory 1845.607-2 Recovering precious metals. (NASA supplements...

  17. 48 CFR 1845.607-2 - Recovering precious metals. (NASA supplements paragraph (b)).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Recovering precious metals. (NASA supplements paragraph (b)). 1845.607-2 Section 1845.607-2 Federal Acquisition Regulations System..., Redistribution, and Disposal of Contractor Inventory 1845.607-2 Recovering precious metals. (NASA supplements...

  18. 48 CFR 1845.607-2 - Recovering precious metals. (NASA supplements paragraph (b)).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Recovering precious metals. (NASA supplements paragraph (b)). 1845.607-2 Section 1845.607-2 Federal Acquisition Regulations System..., Redistribution, and Disposal of Contractor Inventory 1845.607-2 Recovering precious metals. (NASA supplements...

  19. Space Place Prime

    NASA Technical Reports Server (NTRS)

    Fitzpatrick, Austin J.; Novati, Alexander; Fisher, Diane K.; Leon, Nancy J.; Netting, Ruth

    2013-01-01

    Space Place Prime is public engagement and education software for use on iPad. It targets a multi-generational audience with news, images, videos, and educational articles from the Space Place Web site and other NASA sources. New content is downloaded daily (or whenever the user accesses the app) via the wireless connection. In addition to the Space Place Web site, several NASA RSS feeds are tapped to provide new content. Content is retained for the previous several days, or some number of editions of each feed. All content is controlled on the server side, so features about the latest news, or changes to any content, can be made without updating the app in the Apple Store. It gathers many popular NASA features into one app. The interface is a boundless, slidable- in-any-direction grid of images, unique for each feature, and iconized as image, video, or article. A tap opens the feature. An alternate list mode presents menus of images, videos, and articles separately. Favorites can be tagged for permanent archive. Face - book, Twitter, and e-mail connections make any feature shareable.

  20. 20 CFR 401.90 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Contractors. 401.90 Section 401.90 Employees... Privacy Act § 401.90 Contractors. (a) All contracts which require a contractor to maintain, or on behalf... requiring the contractor to comply with the Privacy Act and this part. (b) A contractor and any employee of...

  1. Simulations - Joint NASA-USSR Mission - JSC

    NASA Image and Video Library

    1975-02-25

    S75-22187 (25 Feb. 1975) --- Two ASTP crewmen look over food cans and packages in the Soyuz orbital module trainer in Building 35 during Apollo-Soyuz Test Project joint crew training at NASA's Johnson Space Center. They are astronaut Thomas P. Stafford (left), commander of the American ASTP prime crew; and cosmonaut Aleksey A. Leonov, commander of the Soviet ASTP first (prime) crew. The training session simulated activity on the second day in Earth orbit.

  2. The NASA teleconferencing system: An evaluation

    NASA Technical Reports Server (NTRS)

    Connors, M. M.; Lindsey, G.; Miller, R. H.

    1976-01-01

    The communication requirements of the Apollo project led to the development of a teleconferencing network which linked together, in an audio-fax mode, the several NASA centers and supporting contractors of the Apollo project. The usefulness of this communication linkage for the Apollo project suggested that the system might be extended to include all NASA centers, enabling them to conduct their in-house business more efficiently than by traveling to other centers. A pilot project was run in which seventeen NASA center and subcenters, some with multiple facilities, were connected into the NASA teleconferencing network. During that year, costs were charted and, at the end of the year, an evaluation was made to determine how the system had been used and with what results. The year-end evaluation of the use of NASA teleconferencing system is summarized.

  3. Defense Primer: DOD Contractors

    DTIC Science & Technology

    2017-02-10

    contractors . A defense contractor , as defined by the Code of Federal Regulations, is “any individual, firm, corporation, partnership, association...158.3, “Definitions”). Within the defense policy community, the term contractor is commonly used in two different contexts. The word can describe

  4. Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

    NASA Technical Reports Server (NTRS)

    Brothers, Mary Ann; Safie, Fayssal M. (Technical Monitor)

    2002-01-01

    NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

  5. Oligomerizations of deoxyadenosine bis-phosphates and of their 3-prime-5-prime, 3-prime-3-prime, and 5-prime-5-prime dimers - Effects of a pyrophosphate-linked, poly(T) analog

    NASA Technical Reports Server (NTRS)

    Visscher, J.; Bakker, C. G.; Schwartz, Alan W.

    1990-01-01

    The effect of a 3-prime-5-prime pyrophosphate-linked oligomer of pTp on oligomerizations of pdAp and of its 3-prime-5-prime, 3-prime-3-prime, and 5-prime-5-prime dimers was investigated, using HPLC to separate the reaction mixtures; peak detection was by absorbance monitoring at 254 nm. It was expected that the dimers would form stable complexes with the template, with the degree of stability depending upon the internal linkage of each dimer. It was found that, although the isomers differ substantially in their oligomerization behavior in the absence of template, the analog-template catalyzes the oligomerization to about the same extent in all three cases.

  6. 22 CFR 136.6 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Contractors. 136.6 Section 136.6 Foreign... Contractors. To the extent that contractors enjoy importation or tax privileges in a foreign country because... provisions in their contracts that require the contractors to observe the requirements of these regulations...

  7. Guidelines for health surveillance in the NASA (National Aeronautics and Space Administration) workplace

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The adequacy of biomedical data sheets used by the NASA medical staff for NASA employees and contractors was assessed. Procedures for developing medical histories, conducting medical examinations, and collecting toxicity data were reviewed. Recommendations for employee health maintenance and early detection of work-related abnormalities are given.

  8. 76 FR 68026 - Federal Acquisition Regulation; Small Disadvantaged Business Self-Certification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... Business Administration (SBA) to its small disadvantaged business (SDB) program. DATES: Effective Date... disadvantaged businesses (SDBs) to self-represent their SDB status to prime contractors in good faith when... certified by the SBA as SDB firms. DoD, GSA, and NASA received no comments in response to the interim rule...

  9. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., development, maintenance, and operation of Spanish-American installations and facilities. (b) The Contractor... this contract by reference. (c) The Contractor shall apply to the appropriate Spanish authorities for approval of status as a Direct Contractor in order to complete duty-free import of non-Spanish equipment...

  10. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Contractors' bonds. 1788.12 Section 1788.12... Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  11. NASA X-Ray Observatory Completes Tests Under Harsh Simulated Space Conditions

    NASA Astrophysics Data System (ADS)

    1998-07-01

    NASA's most powerful X-ray observatory has successfully completed a month-long series of tests in the extreme heat, cold, and airless conditions it will encounter in space during its five-year mission to shed new light on some of the darkest mysteries of the universe. The Advanced X-ray Astrophysics Facility was put through the rigorous testing as it was alternately heated and cooled in a special vacuum chamber at TRW Space and Electronics Group in Redondo Beach, Calif., NASA's prime contractor for the observatory. "Successful completion of thermal vacuum testing marks a significant step in readying the observatory for launch aboard the Space Shuttle in January," said Fred Wojtalik, manager of the Observatory Projects Office at NASA's Marshall Space Flight Center in Huntsville, Ala. "The observatory is a complex, highly sophisticated, precision instrument," explained Wojtalik. "We are pleased with the outcome of the testing, and are very proud of the tremendous team of NASA and contractor technicians, engineers and scientists that came together and worked hard to meet this challenging task." Testing began in May after the observatory was raised into the 60-foot thermal vacuum chamber at TRW. Testing was completed on June 20. During the tests the Advanced X-ray Astrophysics Facility was exposed to 232 degree heat and 195 degree below zero Fahrenheit cold. During four temperature cycles, all elements of the observatory - the spacecraft, telescope, and science instruments - were checked out. Computer commands directing the observatory to perform certain functions were sent from test consoles at TRW to all Advanced X-ray Astrophysics Facility components. A team of contractor and NASA engineers and scientists monitored and evaluated the results. Commands were also sent from, and test data monitored at, the Advanced X-ray Astrophysics Facility Operations Control Center in Cambridge, Mass., as part of the test series. The observatory will be managed and controlled from

  12. SKYLAB PRIME CREW IN BLDG. 5

    NASA Image and Video Library

    1973-03-19

    S73-20236 (1 March 1973) --- The three members of the prime crew of the first manned Skylab mission dine on specially prepared Skylab space food in the wardroom of the crew quarters of the Skylab Orbital Workshop (OWS) trainer during Skylab training at the Johnson Space Center. They are, left to right, scientist-astronaut Joseph P. Kerwin, science pilot; astronaut Paul J. Weitz, pilot; and astronaut Charles Conrad Jr., commander. Photo credit: NASA

  13. Kennedy NASA Procedural Requirements 1840.19, Indoor Air Quality Section

    EPA Pesticide Factsheets

    This Section establishes the IAQ management program at Kennedy Space Center. The support services described in this section are available to all Civil Service organizations and NASA contractor organizations as defined in their respective contracts.

  14. NASA Conference on Thermal Radiation Problems in Space Technology: a Compilation of Summaries of the Papers Presented

    NASA Technical Reports Server (NTRS)

    1960-01-01

    This document contains summaries of the talks presented at a small NASA Conference on Thermal Radiation Problems in Space Technology held at the Langley Research Center on September 12 and 13, 1960. The conferees were NASA members and NASA contractors directly concerned with radiation characteristics of materials and with thermal problems of spacecraft. The purpose of the conference was not only to present significant research information but also to provide an opportunity for the conferees to become aware of each other's fields of interest, activities, techniques, and problems. As arranged herein, the first set of talks, mostly by the contractors, is concerned with surfaces and surface coatings, and with the determination of their pertinent characteristics. The second set of talks, mostly by NASA personnel, is concerned with spacecraft and their thermal problems.

  15. NASA Software Engineering Benchmarking Effort

    NASA Technical Reports Server (NTRS)

    Godfrey, Sally; Rarick, Heather

    2012-01-01

    Benchmarking was very interesting and provided a wealth of information (1) We did see potential solutions to some of our "top 10" issues (2) We have an assessment of where NASA stands with relation to other aerospace/defense groups We formed new contacts and potential collaborations (1) Several organizations sent us examples of their templates, processes (2) Many of the organizations were interested in future collaboration: sharing of training, metrics, Capability Maturity Model Integration (CMMI) appraisers, instructors, etc. We received feedback from some of our contractors/ partners (1) Desires to participate in our training; provide feedback on procedures (2) Welcomed opportunity to provide feedback on working with NASA

  16. Contractor and Government: Teamwork and Commitment

    NASA Technical Reports Server (NTRS)

    Griffin, Gerald D.

    1984-01-01

    The assigned topic, "Contractor and Government: Teamwork and Commitment," is a subject about vitally interested. The successes of the U.S. space program were built on such teamwork and commitment. It seems only a short time ago that man's role in space was an unknown quantity. In rapid succession, however, the flights of Shepard, Glenn, and Armstrong demonstrated man's capability to live and travel in space. Consequently, we no longer live with the same awe of space. The success of these joint industry-NASA efforts in achieving our Nation's space goals testifies to the validity of our team's past commitment, management expertise, communications techniques, and teamwork over a period of 25 years. Today, however, We are at the beginning of a new era in space.

  17. Masked priming effect reflects evidence accumulated by the prime.

    PubMed

    Kinoshita, Sachiko; Norris, Dennis

    2010-01-01

    In the same-different match task, masked priming is observed with the same responses but not different responses. Norris and Kinoshita's (2008) Bayesian reader account of masked priming explains this pattern based on the same principle as that explaining the absence of priming for nonwords in the lexical decision task. The pattern of priming follows from the way the model makes optimal decisions in the two tasks; priming does not depend on first activating the prime and then the target. An alternative explanation is in terms of a bias towards responding "same" that exactly counters the facilitatory effect of lexical access. The present study tested these two views by varying both the degree to which the prime predicts the response and the visibility of the prime. Unmasked primes produced effects expected from the view that priming is influenced by the degree to which the prime predicts the response. In contrast, with masked primes, the size of priming for the same response was completely unaffected by predictability. These results rule out response bias as an explanation of the absence of masked priming for different responses and, in turn, indicate that masked priming is not a consequence of automatic lexical access of the prime.

  18. NASA/LaRC jet plume research

    NASA Technical Reports Server (NTRS)

    Seiner, John M.; Ponton, Michael K.; Manning, James C.

    1992-01-01

    The following provides a summary for research being conducted by NASA/LaRC and its contractors and grantees to develop jet engine noise suppression technology under the NASA High Speed Research (HSR) program for the High Speed Civil Transport (HSCT). The objective of this effort is to explore new innovative concepts for reducing noise to Federally mandated guidelines with minimum compromise on engine performance both in take-off and cruise. The research program is divided into four major technical areas: (1) jet noise research on advanced nozzles; (2) plume prediction and validation; (3) passive and active control; and (4) methodology for noise prediction.

  19. Workmanship Challenges for NASA Mission Hardware

    NASA Technical Reports Server (NTRS)

    Plante, Jeannette

    2010-01-01

    This slide presentation reviews several challenges in workmanship for NASA mission hardware development. Several standards for NASA workmanship exist, that are required for all programs, projects, contracts and subcontracts. These Standards contain our best known methods for avoiding past assembly problems and defects. These best practices may not be available if suppliers are used who are not compliant with them. Compliance includes having certified operators and inspectors. Some examples of problems that have occured from the lack of requirements flow-down to contractors are reviewed. The presentation contains a detailed example of the challenge in regards to The Packaging "Design" Dilemma.

  20. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATLmore » Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.« less

  1. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  2. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  3. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  4. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  5. Gemini 11 prime crew during water egress training in Gulf of Mexico

    NASA Technical Reports Server (NTRS)

    1966-01-01

    Gemini 11 prime crew, Astronauts Richard F. Gordon Jr. (left), pilot, and Charles Conrad Jr., command pilot, relax on deck of the NASA Motor Vessel Retriever after suiting up for water egress training in Gulf of Mexico.

  6. 76 FR 39015 - Contractor Performance Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...

  7. 1st NASA Electronic Parts Packaging (NEPP) Program Electronic Technology Workshop (ETW)

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Sampson, Michael J.

    2010-01-01

    NEPP supports all of NASA for >20 years - 7 NASA Centers and JPL actively participate The NEPP Program focuses on the reliability aspects of electronic devices - Three prime technical areas: Parts (die), Packaging, and Radiation Alternately, reliability may be viewed as: -

  8. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...

  9. Overview of NASA MSFC IEC Federated Engineering Collaboration Capability

    NASA Technical Reports Server (NTRS)

    Moushon, Brian; McDuffee, Patrick

    2005-01-01

    The MSFC IEC federated engineering framework is currently developing a single collaborative engineering framework across independent NASA centers. The federated approach allows NASA centers the ability to maintain diversity and uniqueness, while providing interoperability. These systems are integrated together in a federated framework without compromising individual center capabilities. MSFC IEC's Federation Framework will have a direct affect on how engineering data is managed across the Agency. The approach is directly attributed in response to the Columbia Accident Investigation Board (CAB) finding F7.4-11 which states the Space Shuttle Program has a wealth of data sucked away in multiple databases without a convenient way to integrate and use the data for management, engineering, or safety decisions. IEC s federated capability is further supported by OneNASA recommendation 6 that identifies the need to enhance cross-Agency collaboration by putting in place common engineering and collaborative tools and databases, processes, and knowledge-sharing structures. MSFC's IEC Federated Framework is loosely connected to other engineering applications that can provide users with the integration needed to achieve an Agency view of the entire product definition and development process, while allowing work to be distributed across NASA Centers and contractors. The IEC DDMS federation framework eliminates the need to develop a single, enterprise-wide data model, where the goal of having a common data model shared between NASA centers and contractors is very difficult to achieve.

  10. The Mars Express/NASA Project at JPL

    NASA Astrophysics Data System (ADS)

    Thompson, T. W.; Horttor, R. L.; Acton, C. H., Jr.; Zamani, P.; Johnson, W. T. K.; Plaut, J. J.; Holmes, D. P.; No, S.; Asmar, S.; Goltz, G.

    2006-03-01

    The Mars Express/NASA Project at JPL supports much of the U.S. involvement in ESA's Mars Express mission. Mars Express has just completed its prime mission in late 2005 and has embarked on its first extended mission cycle.

  11. TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

    NASA Technical Reports Server (NTRS)

    Young, Roy M.; Adams, Charles L.

    2010-01-01

    The NASA In-Space Propulsion Technology (ISPT) Projects Office sponsored two separate, independent solar sail system design and development demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L' Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators.

  12. Analysis of Potential Alternatives to Reduce NASA's Cost of Human Access to Space

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The purpose of this report is to analyze NASA's potential options for significantly reducing the cost of human access to space. The opinions expressed in this report are based on Hawthorne, Krauss & Associates' ("HKA") interaction with NASA and several of its key contractors over the past nine months. This report is not intended to be an exhaustive quantitative analysis of the various options available to NASA. Instead, its purpose is to outline key decision-related issues that the agency should consider prior to making a decision as to which option to pursue. This report attempts to bring a private-sector perspective to bear on the issue of reducing the cost of human access to space. HKA believes that the key to the NASA's success in reducing those costs over the long-term is the involvement of the private-sector incentives and disciplines--which is achieved only through the assumption of risk by the private sector, not through a traditional contractor relationship--is essential to achieve significant long-term cost reductions.

  13. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Contractors. 68.87 Section 68.87... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This section applies to contractors performing maintenance or repair, turnaround, major renovation, or...

  14. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Government contractors. 10.27 Section 10.27... INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract..., Criminal Penalties, any such contractor and any employee of the contractor are considered, in accordance...

  15. 49 CFR 199.245 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...

  16. 38 CFR 46.8 - Independent contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Independent contractors... contractors. Independent contractors acting on behalf of the Department of Veterans Affairs are subject to the... provide the contractor with notice that a report of a clinical privileges action will be filed with the...

  17. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...

  18. 7 CFR 1726.27 - Contractor's bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall be used when a contractor's bond is required by RUS Forms 200, 257...

  19. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be... furnished by the contractor. Otherwise, state that the contractor shall furnish clean and sound closed-type...

  20. The 2001 NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    Brewer, Jeff C. (Compiler)

    2002-01-01

    This document contains the proceedings of the 34th annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center, November 27-29, 2001. The workshop was attended by scientists and engineers from various agencies of the US Government, aerospace contractors, and battery manufacturers, as well as international participation in like kind. The subjects covered included nickel-hydrogen, nickel-cadmium, lithium-ion, and silver-zinc technologies.

  1. 1401316

    NASA Image and Video Library

    2014-09-17

    RONALD BLAKELY, ASSOCIATE DIRECTOR FOR THE WHITE HOUSE INITIATIVE ON HISTORICALLY BLACK COLLEGES AND UNIVERSITIES, SPEAKS DURING NASA’S FIRST PARTNERSHIPS MEETING FOR HISTORICALLY BLACK COLLEGES AND UNIVERSITIES AND MINORITY SERVING INSTITUTIONS. NASA’S OFFICE OF SMALL BUSINESS PROGRAMS HOSTED THE EVENT, WHICH ALLOWED REPRESENTATIVES FROM 30 NATIONWIDE UNIVERSITIES AND NASA PRIME CONTRACTORS TO DISCUSS POTENTIAL SUBCONTRACTING OPPORTUNITIES

  2. 48 CFR 18.102 - Central contractor registration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Central contractor... Central contractor registration. Contractors are not required to be registered in the Central Contractor.... (See 4.1102). However, contractors are required to register with CCR in order to gain access to the...

  3. Five major NASA health and safety issues

    NASA Astrophysics Data System (ADS)

    Gavert, Raymond B.

    2000-01-01

    The goal has been set to establish NASA as number one in safety in the nation. This includes Systems and Mission Safety as well as Occupational Safety for all NASA employees and contractors on and off the job. There are five major health and safety issues important in the pursuit of being number one and they are: (1) Radiation (2) Hearing (3) Habitability/Toxicology (4) Extravehicular Activity (EVA) (5) Stress. The issues have features of accumulated injury since NASA's future missions involve long time human presence in space i.e., International Space Station operations and Mars missions. The objective of this paper is to discuss these five issues in terms of controlling risks and enhancing health and safety. Safety metrics are discussed in terms of the overall goal of NASA to be number one in safety. .

  4. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Government contractors. 83.19 Section 83.19 Accounts... contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel... of this part to be applied to such system. Any such contractor and any employee of such contractor...

  5. Heat Shield Construction for NASA InSight Mission

    NASA Image and Video Library

    2015-05-27

    In this February 2015 scene from a clean room at Lockheed Martin Space Systems, Denver, specialists are building the heat shield to protect NASA's InSight spacecraft when it is speeding through the Martian atmosphere. Note: After thorough examination, NASA managers have decided to suspend the planned March 2016 launch of the Interior Exploration using Seismic Investigations Geodesy and Heat Transport (InSight) mission. The decision follows unsuccessful attempts to repair a leak in a section of the prime instrument in the science payload. http://photojournal.jpl.nasa.gov/catalog/PIA19404

  6. Priming mortality salience: supraliminal, subliminal and "double-death" priming techniques.

    PubMed

    Mahoney, Melissa B; Saunders, Benjamin A; Cain, Nicole M

    2014-01-01

    The study examined whether successively presented subliminal and supraliminal morality salience primes ("double death" prime) would have a stronger influence on death thought accessibility than subliminal or supraliminal primes alone. A between-subjects 2 (subliminal prime/control) × 2 (supraliminal prime/control) design was used. The supraliminal prime prompted participants to answer questions about death. For the subliminal prime, the word death was presented outside of awareness. Both priming techniques differed significantly from a control in ability to elicit mortality salience. There was an interactive influence of both primes. Implications for unconscious neutral networks relating to death are discussed.

  7. 32 CFR 1701.16 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractors. 1701.16 Section 1701.16 National... Under the Privacy Act of 1974 § 1701.16 Contractors. (a) Any approved contract for the operation of a... prescribed by the Federal Acquisition Regulations (FAR) at 48 CFR part 24, requiring the contractor to comply...

  8. Conversion of prime agricultural land to urban land uses in Kansas City

    NASA Technical Reports Server (NTRS)

    Shaklee, R. V.

    1976-01-01

    In an expanding urban environment, agriculture and urban land uses are the two primary competitors for regional land resources. As a result of an increasing awareness of the effects which urban expansion has upon the regional environment, the conversion of prime agricultural land to urban land uses has become a point of concern to urban planners. A study was undertaken for the Kansas City Metropolitan Region, to determine the rate at which prime agricultural land has been converted to urban land uses over a five year period from 1969 to 1974. Using NASA high altitude color infrared imagery acquired over the city in October, 1969 and in May, 1974 to monitor the extent and location of urban expansion in the interim period, it was revealed that 42% of that expansion had occurred upon land classified as having prime agricultural potential. This involved a total of 10,727 acres of prime agricultural land and indicated a 7% increase over the 1969 which showed that 35% of the urban area had been developed on prime agricultural land.

  9. NASA Worldwide Emergency Medical Assistance

    NASA Technical Reports Server (NTRS)

    Martin, George A.; Tipton, David A.; Long, Irene D.

    1997-01-01

    In an effort to maintain employee health and welfare, ensure customer satisfaction, and to deliver high quality emergency medical care when necessary to employees located overseas, NASA has instituted a new contract with International SOS Assistance INC. International SOS Assistance INC. will provide civil servants and contractors engaged in official NASA business with many services upon request during a medical or personal emergency. Through the years, International SOS Assistance INC. has developed the expertise necessary to provide medical service in all remote areas of the world. One phone call connects you to the SOS network of multilingual staff trained to help resolve travel, medical, legal, and security problems. The SOS network of critical care and aeromedical specialists operates 24 hours a day, 365 days a year from SOS Alarm Centers around the world. This exhibit illustrates the details of the NASA-International SOS Assistance INC. agreement.

  10. Cathode Priming vs. RF Priming for Relativistic Magnetrons

    NASA Astrophysics Data System (ADS)

    White, W. M.; Spencer, T. A.; Price, D.

    2005-10-01

    Magnetron start-oscillation time, pulsewidth and pi-mode locking are experimentally compared for RF priming versus cathode priming on the Michigan-Titan relativistic magnetron (-300 kV, 2-10 kA, 300-500 ns). Cathode priming [1, 2] is an innovative technique first demonstrated experimentally at UM. In this technique, the cathode is fabricated with N/2 emitting strips or N/2-separate cathodes (for an N-cavity magnetron), which generate the desired number of spokes for pi-mode. Cathode priming yields 13% faster startup with more reproducible pi-mode oscillation. Radio Frequency (RF) priming is investigated as the baseline priming technique for magnetrons. The external priming source is a 100kW, 3μs pulsewidth magnetron on loan from AFRL. RF priming reduced startup delay by 15% and increased pulsewidth by 9%. [1] M.C. Jones, V.B. Neculaes, R.M. Gilgenbach, W.M. White, M.R. Lopez, Y.Y. Lau, T.A. Spencer, and D. Price, Rev. Sci. Inst., 75, 2976 (2004) [2] M.C. Jones, Doctoral Dissertation, University of Michigan, 2005

  11. Orion EM-1 Booster Preps - Aft Skirt Preps/Painting

    NASA Image and Video Library

    2016-10-28

    A technician with Orbital ATK, prime contractor for the Space Launch System (SLS) Booster, preps a section of the right hand aft skirt for primer and paint in a support building at the Hangar AF facility at Cape Canaveral Air Force Station in Florida. The space shuttle-era aft skirt will be used on the right hand booster of NASA's SLS rocket for Exploration Mission 1 (EM-1). NASA is preparing for EM-1, deep space missions, and the Journey to Mars.

  12. NASA operations: An agency wide approach to reduce cost

    NASA Technical Reports Server (NTRS)

    Squibb, Gael F.

    1996-01-01

    The NASA Space Operations Management Office (SOMO) is presented. The SOMO concept is based on continuing the distributed participation of the various NASA field centers and agencies, while employing consolidated management through a single lead center. The aim is to determine the duplicity and the overlap between the different agencies that independently developed their own operations management approaches in order to enable more cost effective mission operations by providing common services to the NASA programs. The space operations management will be performed in a distributed manner with a greater degree of contractor involvement than in the past. The changes, approaches and anticipated benefits of this approach to operations are discussed.

  13. 48 CFR 1845.502 - Contractor responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor responsibility. 1845.502 Section 1845.502 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Contractors 1845.502 Contractor responsibility. ...

  14. Orion EM-1 Booster Preps - Aft Skirt Preps/Painting

    NASA Image and Video Library

    2016-10-28

    Technicians with Orbital ATK, prime contractor for the Space Launch System (SLS) Booster, prepare the right hand aft skirt for NASA’s SLS rocket for primer and painting inside a support building at the Hangar AF facility at Cape Canaveral Air Force Station in Florida. The space shuttle-era aft skirt, was inspected and resurfaced and will be primed and painted for use on the right hand booster of the SLS rocket for Exploration Mission 1 (EM-1). NASA is preparing for EM-1, deep-space missions, and the journey to Mars.

  15. Orion EM-1 Booster Preps - Aft Skirt Preps/Painting

    NASA Image and Video Library

    2016-10-28

    Technicians with Orbital ATK, prime contractor for the Space Launch System (SLS) Booster, prepare a paint mixture for the right hand aft skirt for NASA’s SLS in a support building at the Hangar AF facility at Cape Canaveral Air Force Station in Florida. The space shuttle-era aft skirt, was inspected and resurfaced, and will be primed and painted for use on the right hand booster of the SLS rocket for Exploration Mission 1 (EM-1). NASA is preparing for EM-1, deep-space missions, and the Journey to Mars.

  16. 48 CFR 3009.171-8 - Ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Ineligible contractors..., HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 3009.171-8 Ineligible contractors. Any business concern determined to be ineligible...

  17. NASA total quality management 1989 accomplishments report

    NASA Technical Reports Server (NTRS)

    Tai, Betty P. (Editor); Stewart, Lynne M. (Editor)

    1990-01-01

    NASA and contractor employees achieved many notable improvements in 1989. The highlights of those improvements, described in this seventh annual Accomplishments Report, demonstrate that the people who support NASA's activities are getting more involved in quality and continuous improvement efforts. Their gains solidly support NASA's and this Nation's goal to remain a leader in space exploration and in world-wide market competition, and, when communicated to others through avenues such as this report, foster improvement efforts across government and industry. The principles in practice which led to these process refinements are important cultural elements to any organization's productivity and quality efforts. The categories in this report reflect NASA principles set forth in the 1980's and are more commonly known today as Total Quality Management (TQM): top management leadership and support; strategic planning; focus on the customer; employee training and recognition; employee empowerment and teamwork; measurement and analysis; and quality assurance.

  18. 48 CFR 1602.170-4 - Contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... 1602.170-4 Contractor. Contractor means carrier. ...

  19. 48 CFR 1609.471 - Contractor certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...

  20. Subliminal priming with nearly perfect performance in the prime-classification task.

    PubMed

    Finkbeiner, Matthew

    2011-05-01

    The subliminal priming paradigm is widely used by cognitive scientists, and claims of subliminal perception are common nowadays. Nevertheless, there are still those who remain skeptical. In a recent critique of subliminal priming, Pratte and Rouder (Attention, Perception, & Psychophysics, 71, 1276-1283, 2009) suggested that previous claims of subliminal priming may have been due to a failure to control the task difficulty between the experiment proper and the prime-classification task. Essentially, because the prime-classification task is more difficult than the experiment proper, the prime-classification task results may underrepresent the subjects' true ability to perceive the prime stimuli. To address this possibility, prime words were here presented in color. In the experiment proper, priming was observed. In the prime-classification task, subjects reported the color of the primes very accurately, indicating almost perfect control of task difficulty, but they could not identify the primes. Thus, I conclude that controlling for task difficulty does not eliminate subliminal priming.

  1. NASA gateway requirements analysis

    NASA Technical Reports Server (NTRS)

    Duncan, Denise R.; Doby, John S.; Shockley, Cynthia W.

    1991-01-01

    NASA devotes approximately 40 percent of its budget to R&D. Twelve NASA Research Centers and their contractors conduct this R&D, which ranges across many disciplines and is fueled by information about previous endeavors. Locating the right information is crucial. While NASA researchers use peer contacts as their primary source of scientific and technical information (STI), on-line bibliographic data bases - both Government-owned and commercial - are also frequently consulted. Once identified, the STI must be delivered in a usable format. This report assesses the appropriateness of developing an intelligent gateway interface for the NASA R&D community as a means of obtaining improved access to relevant STI resources outside of NASA's Remote Console (RECON) on-line bibliographic database. A study was conducted to determine (1) the information requirements of the R&D community, (2) the information sources to meet those requirements, and (3) ways of facilitating access to those information sources. Findings indicate that NASA researchers need more comprehensive STI coverage of disciplines not now represented in the RECON database. This augmented subject coverage should preferably be provided by both domestic and foreign STI sources. It was also found that NASA researchers frequently request rapid delivery of STI, in its original format. Finally, it was found that researchers need a better system for alerting them to recent developments in their areas of interest. A gateway that provides access to domestic and international information sources can also solve several shortcomings in the present STI delivery system. NASA should further test the practicality of a gateway as a mechanism for improved STI access.

  2. Parachute Testing for NASA InSight Mission

    NASA Image and Video Library

    2015-05-27

    This parachute testing for NASA's InSight mission to Mars was conducted inside the world's largest wind tunnel, at NASA Ames Research Center, Moffett Field, California, in February 2015. The wind tunnel is 80 feet (24 meters) tall and 120 feet (37 meters) wide. It is part of the National Full-Scale Aerodynamics Complex, operated by the Arnold Engineering Development Center of the U.S. Air Force. Note: After thorough examination, NASA managers have decided to suspend the planned March 2016 launch of the Interior Exploration using Seismic Investigations Geodesy and Heat Transport (InSight) mission. The decision follows unsuccessful attempts to repair a leak in a section of the prime instrument in the science payload. http://photojournal.jpl.nasa.gov/catalog/PIA19405

  3. 48 CFR 752.7013 - Contractor-mission relationships.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...

  4. 48 CFR 852.237-70 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...

  5. 30 CFR 45.4 - Independent contractor register.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...

  6. A Wideband Autonomous Cognitive Radio Development and Prototyping System

    DTIC Science & Technology

    2017-11-14

    Gain, High Frequency , Circularly Polarized Planar Antenna Arrays for Space Applications”, NASA. 3. C. G. Christodoulou (Co-Principal Investigator...Investigator), “Cognitive Communications for SATCOM”, Space Vehicles (RV) University Grants Program, 04/26/16-04/25/17 ($150K), Air Force Research...Aerospace (Prime Contractor). 2. S. K. Jayaweera (Principal Investigator), “Cognitive Communications for SATCOM”, Space Vehicles (RV) University Grants

  7. 48 CFR 1509.170-8 - Contractor Performance Report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  8. NASA-6 atmospheric measuring station. [calibration, functional checks, and operation of measuring instruments

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Information required to calibrate, functionally check, and operate the Instrumentation Branch equipment on the NASA-6 aircraft is provided. All procedures required for preflight checks and in-flight operation of the NASA-6 atmospheric measuring station are given. The calibration section is intended for only that portion of the system maintained and calibrated by IN-MSD-12 Systems Operation contractor personnel. Maintenance is not included.

  9. 48 CFR 52.241-5 - Contractor's Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Facilities....241-5 Contractor's Facilities. As prescribed in 41.501(c)(4), insert a clause substantially the same as the following: Contractor's Facilities (FEB 1995) (a) The Contractor, at its expense, unless...

  10. 14 CFR 1245.108 - License to contractor.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  11. 48 CFR 52.247-28 - Contractor's Invoices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed by...

  12. 48 CFR 33.207 - Contractor certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor certification... CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 33.207 Contractor certification. (a) Contractors shall provide the certification specified in paragraph (c) of this section when...

  13. 48 CFR 725.703 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an USAID...

  14. NASA SBIR product catalog, 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This catalog is a partial list of products of NASA SBIR (Small Business Innovation Research) projects that have advanced to some degree into Phase 3. While most of the products evolved from work conducted during SBIR Phase 1 and 2, a few advanced to commercial status solely from Phase 1 activities. The catalog presents information provided to NASA by SBIR contractors who wished to have their products exhibited at Technology 2001, a NASA-sponsored technology transfer conference held in San Jose, California, on December 4, 5, and 6, 1991. The catalog presents the product information in the following technology areas: computer and communication systems; information processing and AI; robotics and automation; signal and image processing; microelectronics; electronic devices and equipment; microwave electronic devices; optical devices and lasers; advanced materials; materials processing; materials testing and NDE; materials instrumentation; aerodynamics and aircraft; fluid mechanics and measurement; heat transfer devices; refrigeration and cryogenics; energy conversion devices; oceanographic instruments; atmosphere monitoring devices; water management; life science instruments; and spacecraft electromechanical systems.

  15. At the Cosmonaut Hotel in Baikonur, Kazakhstan, Expedition 48-49 backup crewmember Peggy Whitson of NASA waters a tree in her name first planted in 2007 during traditional pre-launch activities June 30. Whitson is one of three backups to the prime crewmembers, Kate Rubins of NASA, Anatoly Ivanishin of Roscosmos and Takuya Onishi of the Japan Aerospace Exploration Agency, who will launch July 7, Baikonur time, on the Soyuz MS-01 spacecraft for a planned four-month mission on the International Space Station...NASA/Alexander Vysotsky.

    NASA Image and Video Library

    2016-06-30

    At the Cosmonaut Hotel in Baikonur, Kazakhstan, Expedition 48-49 backup crewmember Peggy Whitson of NASA waters a tree in her name first planted in 2007 during traditional pre-launch activities June 30. Whitson is one of three backups to the prime crewmembers, Kate Rubins of NASA, Anatoly Ivanishin of Roscosmos and Takuya Onishi of the Japan Aerospace Exploration Agency, who will launch July 7, Baikonur time, on the Soyuz MS-01 spacecraft for a planned four-month mission on the International Space Station. NASA/Alexander Vysotsky

  16. 48 CFR 1845.502-70 - Contractor-acquired property.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor-acquired... Possession of Contractors 1845.502-70 Contractor-acquired property. All contractor-acquired property must be... contractor-acquired. (2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format...

  17. 48 CFR 1252.242-71 - Contractor testimony.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony. 1252... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to...

  18. Apollo 7 prime crew during water egress training in Gulf of Mexico

    NASA Technical Reports Server (NTRS)

    1968-01-01

    The prime crew of the first manned Apollo space mission, Apollo 7, stands on the deck of the NASA Motor Vessel Retriever after suiting up for water egress training in the Gulf of Mexico. Left to right, are Astronauts Walter Cunningham, Donn F. Eisele, and Walter M. Schirra Jr.

  19. 24 CFR 242.53 - Excluded contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Excluded contractors. 242.53... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.53 Excluded contractors. (a) Contracts relating to the... participation in federal programs, including but not limited to: A general contractor, a subcontractor, or...

  20. 40 CFR 35.6600 - Contractor claims.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contractor claims. 35.6600 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6600 Contractor claims. (a) General... prepared by the contractor to support a claim against the recipient; and (4) The award official determines...

  1. NASA Announces Contest to Name X-Ray Observatory

    NASA Astrophysics Data System (ADS)

    1998-04-01

    NASA is searching for a new name for the Advanced X-ray Astrophysics Facility (AXAF), currently scheduled for launch Dec. 3, 1998, from the Space Shuttle Columbia. AXAF is the third of NASA's Great Observatories, after the Hubble Space Telescope and the Compton Gamma Ray Observatory. Once in orbit around Earth, it will explore hot, turbulent regions in the universe where X-rays are produced. Dr. Alan Bunner, director of NASA's Structure and Evolution of the universe science program, will announce April 18 at the National Science Teacher's Association meeting in Las Vegas, NV, the start of a contest, open to people worldwide, to find a new name for the observatory. Entries should contain the name of a person (not living), place, or thing from history, mythology, or fiction. Contestants should describe in a few sentences why this choice would be a good name for AXAF. The name must not have been used before on space missions by NASA or other organizations or countries. The grand prize will be a trip to NASA's Kennedy Space Center in Cape Canaveral, FL, to see the launch of the satellite aboard the Space Shuttle. Ten runner-up prizes will be awarded and all entrants will receive an AXAF poster. The grand prize is sponsored by TRW Inc., AXAF's prime contractor. The AXAF Science Center in Cambridge, MA, will run the contest for NASA. NASA will announce the final selection of the winning name later this year. Entries also can be mailed to: AXAF Contest, AXAF Science Center, Office of Education and Public Outreach, 60 Garden Street, MS 83, Cambridge, MA 02138. Mailed entries must be postmarked no later than June 30, 1998. All entries must state a name for the mission, along with the reason the name would make a good choice. The observatory, now in the final stages of assembly and testing at TRW's facility in Redondo Beach, CA, is more than 45 feet long and weighs 10,500 pounds. AXAF is the largest and most powerful X-ray observatory ever constructed, and its images will be

  2. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  3. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  4. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  5. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  6. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  7. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Government contractors. 513.36 Section... contractors. (a) No Bureau component may contract for the operation of a record system by or on behalf of the... component shall have the responsibility to ensure that the contractor complies with the contract...

  8. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    A Small Business panel discussion was held during Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. Seated at the table, from left, are Ileana Serrano, data dissemination specialist, U.S. Census Bureau; Margot Dorfman, chief executive officer, U.S. Women's Chamber of Commerce; Valerie Muck, Small Business director; U.S. Air Force; Andrew Harold, co-founder and board chairman, Florida 8(a) Alliance; and Eduardo Ramos, senior area manager, U.S. Small Business Administration. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  9. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  10. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  11. How do we Remain Us in a Time of Change: Culture and Knowledge Management at NASA

    NASA Technical Reports Server (NTRS)

    Linde, Charlotte

    2003-01-01

    This viewgraph representation presents an overview of findings of a NASA agency-wide Knowledge Management Team considering culture and knowledge management issues at the agency. Specific issues identified by the team include: (1) NASA must move from being a knowledge hoarding culture to a knowledge sharing culture; (2) NASA must move from being center focused to being Agency focused; (3) NASA must capture the knowledge of a departing workforce. Topics considered include: what must NASA know to remain NASA, what were previous forms of knowledge reproduction and how has technological innovations changed these systems, and what changes in funding and relationships between contractors and NASA affected knowledge reproduction.

  12. Development of occupational health at NASA: five decades of progress.

    PubMed

    Doarn, Charles R; Angotti, Catherine; Cooper, Linda

    2012-03-01

    As NASA celebrates the 50th anniversary of human spaceflight, we reflect back on the individuals who forged a new way in the frontier of space. While much has been written about the astronauts and the systems that got them into space and safely home; less attention has been given to NASA employees and its contractors. NASA has always been conscious of the unique nature of its workforce and its importance to the space program. NASA established a comprehensive occupational health program, which began as part of the Agency's Space Medicine function in the early 1960s. Over the years, this program grew in stature and capability. This paper traces the history and development of NASA's Occupational Health, highlighting the programs and people who focused their energies on ensuring the health and safety of its workforce.

  13. 45 CFR 5b.12 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Contractors. 5b.12 Section 5b.12 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION PRIVACY ACT REGULATIONS § 5b.12 Contractors. (a) All contracts entered into on or after September 27, 1975 which require a contractor to maintain...

  14. Management and operating contractors' pension plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1987-06-01

    This report concerns the management of 28 M and O contractor pension plans with assets exceeding $2.6 billion in 1983. At the end of 1983, these pension plans were overfunded by $600 million. The Department could have saved $94 million in 1983 had the contractors been required to limit their pension plan contributions to the Government-established minimum level. Since 1979, the Department has continually reimbursed these contractors for contributions to pension plans that were already overfunded and we estimate that these plans are currently overfunded in excess of $1 billion. Additional annual savings of about $548,000 could be realized ifmore » the Department obtained waivers for M and O contractors participating in the Pension Benefit Guaranty Corporation's (PBGC) insurance program. Management and Administration, which has overall responsibility for controlling such costs, indicated it did not agree that contractors should fund pension plans at only the minimum required level. General agreement was indicated with the need to obtain waivers from PBGC premiums and better protect the Department's interest in contractor excess pension assets.« less

  15. The 1999 NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    Brewer, J. C. (Compiler)

    2000-01-01

    This document contains the proceedings of the 32nd annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center on November 16-18, 1999. The workshop was attended by scientists and engineers from various agencies of the US Government, aerospace contractors, and battery manufacturers, as well as international participation in like kind from a number of countries around the world. The subjects covered included nickel-hydrogen, nickel-cadmium, lithium-ion, and silver-zinc technologies.

  16. The 2000 NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    Brewer, J. C. (Compiler)

    2001-01-01

    This document contains the proceedings of the 33nd annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center on November 14-16, 2000. The workshop was attended by scientists and engineers from various agencies of the U.S. Government, aerospace contractors, and battery manufacturers, as well as international participation in like kind from a number of countries around the world. The subjects covered included nickel-hydrogen, lithium-ion, lithium-sulfur, and silver-zinc technologies.

  17. The 'prime-ome': towards a holistic approach to priming.

    PubMed

    Balmer, Andrea; Pastor, Victoria; Gamir, Jordi; Flors, Victor; Mauch-Mani, Brigitte

    2015-07-01

    Plants can be primed to respond faster and more strongly to stress and multiple pathways, specific for the encountered challenge, are involved in priming. This adaptability of priming makes it difficult to pinpoint an exact mechanism: the same phenotypic observation might be the consequence of unrelated underlying events. Recently, details of the molecular aspects of establishing a primed state and its transfer to offspring have come to light. Advances in techniques for detection and quantification of elements spanning the fields of transcriptomics, proteomics, and metabolomics, together with adequate bioinformatics tools, will soon allow us to take a holistic approach to plant defence. This review highlights the state of the art of new strategies to study defence priming in plants and provides perspectives towards 'prime-omics'. Copyright © 2015 Elsevier Ltd. All rights reserved.

  18. NASA Technology Evaluation for Environmental Risk Mitigation Remediation Technology Collaboration Development

    NASA Technical Reports Server (NTRS)

    Romeo, James

    2013-01-01

    NASA is committed to finding solutions to agency cleanup problems that are better, cheaper, and more effective than the status quo. Unfortunately, some potential solutions involve innovative technologies for which NASA remediation managers may not have a high level of understanding or confidence. Since 2004, NASA's Stennis Space Center (SSC) in Mississippi has been pumping groundwater contaminated with trichloroethylene (TCE) and other halogenated volatile organic compounds (HVOC) from their cleanup location designated "Area G" through extraction wells to an aboveground treatment system. Over time, however, the effectiveness of this treatment strategy has diminished and an alternative approach is needed. In 2012, professionals from NASA's Principal Center for Technology Evaluation for Environmental Risk Mitigation (TEERM) introduced SSC managers to an innovative technology for enhancing the performance of SSC's existing pump and treat system. The technology, generally referred to as in situ chemical oxidation (ISCO), involves slowly and continuously injecting a strong but safe chemical oxidant into the groundwater. Treatment is enhanced by a "surfactant-type effect" which causes residual contamination from saturated soil to be released into the dissolved-phase where it can be readily oxidized. Any dissolved-phase contamination that was not oxidized can be collected by the extraction well network and treated aboveground. SSC was not familiar with the technology so to increase their confidence, TEERM identified a contractor who was willing to demonstrate their product and process at a significantly reduced price. An initial, small-scale demonstration of ISCO began at sse in March 2012 and completed in August 2012. This successful demonstration was followed by three larger-scale ISCO demonstrations between August and December 2012. The contractor's innovative Continuous Injection System (CIS) incorporated "green" and sustainable technologies and practices. A slow

  19. 48 CFR 970.4402 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  20. 34 CFR 5b.12 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Contractors. 5b.12 Section 5b.12 Education Office of the Secretary, Department of Education PRIVACY ACT REGULATIONS § 5b.12 Contractors. (a) All contracts entered into on or after September 27, 1975 which require a contractor to maintain or on behalf of the...

  1. Interaction of prime and target in the subliminal affective priming effect.

    PubMed

    Haneda, Kaoruko; Nomura, Michio; Iidaka, Tetsuya; Ohira, Hideki

    2003-04-01

    It has been found that an emotional stimulus such as a facial expression presented subliminally can affect subsequent information processing and behavior, usually by shifting evaluation of a subsequent stimulus to a valence congruent with the previous stimulus. This phenomenon is called subliminal affective priming. The present study was conducted to replicate and expand previous findings by investigating interaction of primes and targets in the affective priming effect. Two conditions were used. Prime (subliminal presentation 35 msec.) of an angry face of a woman and a No Prime control condition. Just after presentation of the prime, an ambiguous angry face or an emotionally neutral face was presented above the threshold of awareness (500 msec.). 12 female undergraduate women judged categories of facial expressions (Anger, Neutral, or Happiness) for the target faces. Analysis indicated that the Anger primes significantly facilitated judgment of anger for the ambiguous angry faces; however, the priming effect of the Anger primes was not observed for neutral faces. Consequently, the present finding suggested that a subliminal affective priming effect should be more prominent when affective valence of primes and targets is congruent.

  2. Prime Retrieval of Motor Responses in Negative Priming

    ERIC Educational Resources Information Center

    Mayr, Susanne; Buchner, Axel; Dentale, Sandra

    2009-01-01

    Three auditory identification experiments were designed to specify the prime-response retrieval model of negative priming (S. Mayr & A. Buchner, 2006), which assumes that the prime response is retrieved in ignored repetition trials and interferes with probe responding. In Experiment 1, shortly before (in Experiment 1A) or after (in Experiment 1B)…

  3. NASA Langley Research and Technology-Transfer Program in Formal Methods

    NASA Technical Reports Server (NTRS)

    Butler, Ricky W.; Caldwell, James L.; Carreno, Victor A.; Holloway, C. Michael; Miner, Paul S.; DiVito, Ben L.

    1995-01-01

    This paper presents an overview of NASA Langley research program in formal methods. The major goals of this work are to make formal methods practical for use on life critical systems, and to orchestrate the transfer of this technology to U.S. industry through use of carefully designed demonstration projects. Several direct technology transfer efforts have been initiated that apply formal methods to critical subsystems of real aerospace computer systems. The research team consists of five NASA civil servants and contractors from Odyssey Research Associates, SRI International, and VIGYAN Inc.

  4. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burdick, A.

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVACmore » companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational

  5. 48 CFR 51.104 - Furnishing assistance to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors. 51.104 Section 51.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 51.104 Furnishing assistance to contractors. After receiving an activity address code, the contracting...

  6. Leadership Development Program Final Project

    NASA Technical Reports Server (NTRS)

    Parrish, Teresa C.

    2016-01-01

    TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.

  7. PrimeSupplier Cross-Program Impact Analysis and Supplier Stability Indicator Simulation Model

    NASA Technical Reports Server (NTRS)

    Calluzzi, Michael

    2009-01-01

    PrimeSupplier, a supplier cross-program and element-impact simulation model, with supplier solvency indicator (SSI), has been developed so that the shuttle program can see early indicators of supplier and product line stability, while identifying the various elements and/or programs that have a particular supplier or product designed into the system. The model calculates two categories of benchmarks to determine the SSI, with one category focusing on agency programmatic data and the other focusing on a supplier's financial liquidity. PrimeSupplier was developed to help NASA smoothly transition design, manufacturing, and repair operations from the Shuttle program to the Constellation program, without disruption in the industrial supply base.

  8. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  9. Aerospace Safety Advisory Panel

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This report provides findings, conclusions and recommendations regarding the National Space Transportation System (NSTS), the Space Station Freedom Program (SSFP), aeronautical projects and other areas of NASA activities. The main focus of the Aerospace Safety Advisory Panel (ASAP) during 1988 has been monitoring and advising NASA and its contractors on the Space Transportation System (STS) recovery program. NASA efforts have restored the flight program with a much better management organization, safety and quality assurance organizations, and management communication system. The NASA National Space Transportation System (NSTS) organization in conjunction with its prime contractors should be encouraged to continue development and incorporation of appropriate design and operational improvements which will further reduce risk. The data from each Shuttle flight should be used to determine if affordable design and/or operational improvements could further increase safety. The review of Critical Items (CILs), Failure Mode Effects and Analyses (FMEAs) and Hazard Analyses (HAs) after the Challenger accident has given the program a massive data base with which to establish a formal program with prioritized changes.

  10. 30 CFR 45.3 - Identification of independent contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Identification of independent contractors. 45.3... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.3 Identification of independent contractors. (a) Any independent contractor may obtain a permanent MSHA identification number. To obtain an identification number...

  11. 48 CFR 52.204-7 - Central Contractor Registration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Central Contractor....204-7 Central Contractor Registration. As prescribed in 4.1105, use the following clause: Central Contractor Registration (APR 2008) (a) Definitions. As used in this clause— Central Contractor Registration...

  12. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  13. NASA Ares I Crew Launch Vehicle Upper Stage Overview

    NASA Technical Reports Server (NTRS)

    Davusm Daniel J.; McArthur, J. Craig

    2008-01-01

    By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system.

  14. NASA Ares I Crew Launch Vehicle Upper State Overview

    NASA Technical Reports Server (NTRS)

    Davis, Daniel J.

    2008-01-01

    By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA s Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program s transportation system.

  15. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  16. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  17. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business system... BUSINESS SYSTEMS 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  18. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor business system... BUSINESS SYSTEMS 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  19. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  20. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  1. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  2. 48 CFR 42.402 - Visits to contractors' facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Visits to contractors... contractors' facilities. (a) Government personnel planning to visit a contractor's facility in connection with... positions, and security clearances. (2) Date and duration of visit. (3) Name and address of contractor and...

  3. (GT-6 PRIME CREW((PREFLIGHT ACTIVITY) - ASTRONAUT THOMAS P. STAFFORD - MISC.

    NASA Image and Video Library

    1965-12-12

    S65-59977 (15 Dec. 1965) --- Astronauts Thomas P. Stafford (foreground), Gemini-6 prime crew pilot; and Alan B. Shepard Jr., chief, Astronaut Office, Manned Spacecraft Center, look over a Gemini mission chart in the suiting trailer at Launch Complex 16 during the Gemini-6 prelaunch countdown at Cape Kennedy, Florida. Photo credit: NASA or National Aeronautics and Space Administration

  4. 41 CFR 109-38.301-1 - Contractors' use.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Contractors' use. 109-38...-38.301-1 Contractors' use. Heads of field organizations shall ensure that provisions of the FPMR concerning contractor use of Government motor vehicles are complied with by their designated contractors. ...

  5. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...

  6. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...

  7. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...

  8. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...

  9. 48 CFR 450.303-1 - Contractor requests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor requests. 450.303-1 Section 450.303-1 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Contract Adjustments 450.303-1 Contractor requests. Contractor...

  10. 78 FR 11164 - Policy on Contractor Profits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System Policy on Contractor Profits AGENCY... Authorization Act for Fiscal Year 2013. Section 804, Department of Defense Policy on Contractor Profits... modifications to such guidelines that are necessary to ensure an appropriate link between contractor profit and...

  11. 48 CFR 970.5203-3 - Contractor's organization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  12. 48 CFR 46.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  13. NASA Awards Chandra X-Ray Observatory Follow-On Contract

    NASA Astrophysics Data System (ADS)

    2003-08-01

    blocks X-rays from reaching the surface. The Chandra Observatory travels one-third of the way to the moon during its orbit around the Earth every 64 hours. At its highest point, Chandra's highly elliptical, or egg- shaped, orbit is 200 times higher than that of its visible- light-gathering sister, the Hubble Space Telescope. NASA's Marshall Space Flight Center, Huntsville, Ala., manages the Chandra program for the Office of Space Science, NASA Headquarters, Washington. Northrop Grumman of Redondo Beach, Calif., formerly TRW, Inc., was the prime development contractor for the observatory. The Smithsonian Astrophysical Observatory controls science and flight operations from the Chandra X-ray Center in Cambridge, Mass. For information about NASA on the Internet, visit: http://www.nasa.gov For information about the Chandra X-ray Observatory on the Internet, visit: http://chandra.harvard.edu and http://chandra.nasa.gov

  14. Microgravity

    NASA Image and Video Library

    2000-01-30

    Engineers from NASA's Glenn Research Center demonstrate the access to one of the experiment racks planned for the U.S. Destiny laboratory module on the International Space Station (ISS). This mockup has the full diameter, full corridor width, and half the length of the module. The mockup includes engineering mockups of the Fluids and Combustion Facility being developed by NASA's Glenn Research Center. (The full module will be six racks long; the mockup is three racks long). Listening at center is former astronaut Brewster Shaw (center), now a program official with the Boeing Co., the ISS prime contractor. Photo credit: NASA/Marshall Space Flight Center (MSFC)

  15. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... 923.102 Applicability to contractors. Many of the Department's major facilities are operated by contractors. Provisions regarding those contracts may be found at Part 970 of this chapter. At other locations...

  16. 48 CFR 2427.305-2 - Follow-up by contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...

  17. A NASA-wide approach toward cost-effective, high-quality software through reuse

    NASA Technical Reports Server (NTRS)

    Scheper, Charlotte O. (Editor); Smith, Kathryn A. (Editor)

    1993-01-01

    NASA Langley Research Center sponsored the second Workshop on NASA Research in Software Reuse on May 5-6, 1992 at the Research Triangle Park, North Carolina. The workshop was hosted by the Research Triangle Institute. Participants came from the three NASA centers, four NASA contractor companies, two research institutes and the Air Force's Rome Laboratory. The purpose of the workshop was to exchange information on software reuse tool development, particularly with respect to tool needs, requirements, and effectiveness. The participants presented the software reuse activities and tools being developed and used by their individual centers and programs. These programs address a wide range of reuse issues. The group also developed a mission and goals for software reuse within NASA. This publication summarizes the presentations and the issues discussed during the workshop.

  18. 14 CFR 1245.108 - License to contractor.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true License to contractor. 1245.108 Section 1245.108 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PATENTS AND OTHER INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor reporting...

  19. 6 CFR 25.8 - Government contractor Defense.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 6 Domestic Security 1 2012-01-01 2012-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  20. 6 CFR 25.8 - Government contractor Defense.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 6 Domestic Security 1 2013-01-01 2013-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  1. 32 CFR 989.23 - Contractor prepared documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractor prepared documents. 989.23 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force... should reflect on the cover sheet they are an Air Force document. Contractor preparation information...

  2. 6 CFR 25.8 - Government contractor Defense.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  3. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  4. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  5. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  6. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  7. Prime Diagnosticity in Short-Term Repetition Priming: Is Primed Evidence Discounted, Even when It Reliably Indicates the Correct Answer?

    ERIC Educational Resources Information Center

    Weidemann, Christoph T.; Huber, David E.; Shiffrin, Richard M.

    2008-01-01

    The authors conducted 4 repetition priming experiments that manipulated prime duration and prime diagnosticity in a visual forced-choice perceptual identification task. The strength and direction of prime diagnosticity produced marked effects on identification accuracy, but those effects were resistant to subsequent changes of diagnosticity.…

  8. The NASA space power technology program

    NASA Technical Reports Server (NTRS)

    Stephenson, R. Rhoads

    1992-01-01

    NASA has a broad technology program in the field of space power. This paper describes that program, including the roles and responsibilities of the various NASA field centers and major contractors. In the power source area, the paper discusses the SP-100 Space Nuclear Power Project, which has been under way for about seven years and is making substantial progress toward development of components for a 100-kilowatt power system that can be scaled to other sizes. This system is a candidate power source for nuclear electric propulsion, as well as for a power plant for a lunar base. In the energy storage area, the paper describes NASA's battery- and fuel-cell development programs. NASA is actively working on NiCd, NiH2, and lithium batteries. A status update is also given on a U.S. Air Force-sponsored program to develop a large (150 ampere-hour) lithium-thionyl chloride battery for the Centaur upper-stage launch vehicle. Finally, the area of power management and distribution (PMAD) is addressed, including power system components such as solid-state switches and power integrated circuits. Automated load management and other computer-controlled functions offer considerable payoffs. The state of the art in space power is described, along with NASA's medium- and long-term goals in the area.

  9. The NGST Yardstick Integrated Science Instrument Module (ISIM) Feasibility Study

    NASA Astrophysics Data System (ADS)

    Greenhouse, M. A.; NGST ISIM Team

    1999-05-01

    The Next Generation Space Telescope (NGST) Integrated Science Instrument Module (ISIM) is a distributed system consisting of a cryogenic instrument module that is integrated with the Optical Telescope Assembly (OTA) and science processors, software, and other electronics located in the Space Support Module (SSM). The ISIM system provides structure, environment, and data handling for several modular science instruments as well as several components of the OTA optics train. An ISIM baseline design and feasibility study is ongoing at GSFC. This pre-Phase A design was developed for integration with the Yardstick NGST architecture and packaging in a 5 m class EELV fairing. The goals of this study are to: [1] demonstrate mission science feasibility, [2] assess ISIM engineering and cost feasibility, [3] identify ISIM technology challenge areas,and [4] enable smart customer procurement of the NGST. In depth results from this work beyond those displayed here can be found at: http://www701.gsfc.nasa.gov/isim/isim.htm The flight ISIM will be developed by a GSFC led IPT that includes members from the STScI and, during Phase A/B, will grow to include the NGST Prime Contractor, and science instrument development teams from European, Canadian , and US science communities. Science instruments will be competitively procured from the science community, and will be integrated into the ISIM by GSFC. The flight qualified ISIM will then be delivered by GSFC to the NGST Prime Contractor for observatory level integration. At the start of NGST Phase A (Spring 1999), two competing prime contractors will begin development of separate NGST architectures, and the ISIM IPT will develop two ISIM designs corresponding to these architectures. Down selection to a single design will occur during mid 2001. The ISIM team welcomes science community feedback. Contact the IPT lead: Matt Greenhouse: matt@stars.gsfc.nasa.gov.

  10. 42 CFR 455.202 - Limitation on contractor liability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Limitation on contractor liability. 455.202 Section... § 455.202 Limitation on contractor liability. (a) A program contractor, a person, or an entity employed... contractor will not be held to have violated any criminal law and will not be held liable in any civil action...

  11. NASA Sees Orbiting Stars Flooding Space with Gravitational Waves

    NASA Astrophysics Data System (ADS)

    2005-05-01

    period of 321.5 seconds - barely more than five minutes. The observed five-minute period in J0806 is most likely the orbital period of the white dwarf system. However the possibility that it represents the spin of one of its white dwarfs cannot yet be completely ruled out. "It's either the most compact binary known or one of the most unusual systems we've ever seen," said Strohmayer. "Either way it's got a great story to tell." Strohmayer's Chandra X-ray observations, which will be published in an upcoming issue of The Astrophysical Journal, tighten orbital decay estimates made through optical observations in recent years independently by teams led by GianLuca Israel of the Astronomical Observatory of Rome and by Pasi Hakala of the University of Helsinki. NASA's Marshall Space Flight Center, Huntsville, Ala., manages the Chandra program for NASA's Science Mission Directorate, Washington. Northrop Grumman of Redondo Beach, Calif., was the prime development contractor for the observatory. The Smithsonian Astrophysical Observatory controls science and flight operations from the Chandra X-ray Center in Cambridge, Mass. Additional information and images are available at: http://chandra.harvard.edu and http://chandra.nasa.gov

  12. The Role of Representation Strength of the Prime in Subliminal Visuomotor Priming.

    PubMed

    Wang, Yongchun; Wang, Yonghui; Liu, Peng; Di, Meilin; Gong, Yanyan; Tan, Mengge

    2017-11-01

    This study investigated the role of representation strength of the prime in subliminal visuomotor priming in two experiments. Prime/target compatibility (compatible and incompatible) and preposed object type (jumbled lines, strong masking; and rectangular outlines, weak masking) were manipulated in Experiment 1. A significant negative compatibility effect (NCE) was observed in the rectangle condition, whereas no compatibility effect was found in the line condition. However, when a new variable, prime duration, was introduced in Experiment 2, the NCE was reversed with an increase in the prime duration in the rectangle condition, whereas the NCE was maintained in the line condition. This result is consistent with the claim that increasing the prime duration causes the prime representation to be too strong for inhibition in the rectangle condition but strong enough to reliably trigger inhibition in the line condition. The findings demonstrated that prime representation has a causal role in subliminal visuomotor priming.

  13. 5[prime] to 3[prime] nucleic acid synthesis using 3[prime]-photoremovable protecting group

    DOEpatents

    Pirrung, M.C.; Shuey, S.W.; Bradley, J.C.

    1999-06-01

    The present invention relates, in general, to a method of synthesizing a nucleic acid, and, in particular, to a method of effecting 5[prime] to 3[prime] nucleic acid synthesis. The method can be used to prepare arrays of oligomers bound to a support via their 5[prime] end. The invention also relates to a method of effecting mutation analysis using such arrays. The invention further relates to compounds and compositions suitable for use in such methods.

  14. Motor Priming in Neurorehabilitation

    PubMed Central

    Stoykov, Mary Ellen; Madhavan, Sangeetha

    2014-01-01

    Priming is a type of implicit learning wherein a stimulus prompts a change in behavior. Priming has been long studied in the field of psychology. More recently, rehabilitation researchers have studied motor priming as a possible way to facilitate motor learning. For example, priming of the motor cortex is associated with changes in neuroplasticity that are associated with improvements in motor performance. Of the numerous motor priming paradigms under investigation, only a few are practical for the current clinical environment, and the optimal priming modalities for specific clinical presentations are not known. Accordingly, developing an understanding of the various types of motor priming paradigms and their underlying neural mechanisms is an important step for therapists in neurorehabilitation. Most importantly, an understanding of the methods and their underlying mechanisms is essential for optimizing rehabilitation outcomes. The future of neurorehabilitation is likely to include these priming methods, which are delivered prior to or in conjunction with primary neurorehabilitation therapies. In this Special Interest article we discuss those priming paradigms that are supported by the greatest amount of evidence including: (i) stimulation-based priming, (ii) motor imagery and action observation, (iii) sensory priming, (iv) movement-based priming, and (v) pharmacological priming. PMID:25415551

  15. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a contractor...

  16. 10 CFR 436.32 - Qualified contractors lists.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Qualified contractors lists. 436.32 Section 436.32 Energy... Procedures for Energy Savings Performance Contracting § 436.32 Qualified contractors lists. (a) DOE shall... energy savings performance contracts. (c) DOE may remove a firm from DOE's list of qualified contractors...

  17. 21 CFR 21.30 - Records of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Records of contractors. 21.30 Section 21.30 Food... PRIVACY Requirements for Specific Categories of Records § 21.30 Records of contractors. (a) Systems of... contractors to accomplish Food and Drug Administration functions, from which information is retrieved by...

  18. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Disclosure to contractors. 20.90 Section 20.90... INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise exempt from public disclosure may be disclosed to contractors with the Food and Drug Administration and...

  19. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a contractor...

  20. The 1993 NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    Brewer, Jeffrey C. (Compiler)

    1994-01-01

    This document contains the proceedings of the 26th annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center on 16-18 Nov. 1993. The workshop was attended by scientists and engineers from various agencies of the U.S. Government, aerospace contractors, and battery manufacturers, as well as international participation in like kind from a number of countries around the world. The subjects covered included nickel-cadmium, nickel-hydrogen, nickel-metal hydride, and lithium based technologies, as well as advanced technologies including various bipolar designs.

  1. The 1990 NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    Kennedy, Lewis M. (Compiler)

    1991-01-01

    This document contains the proceedings of the 21st annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center on December 4-6, 1990. The workshop was attended by scientists and engineers from various agencies of the U.S. Government, aerospace contractors, and battery manufacturers as well as participation in like kind from the European Space Agency member nations. The subjects covered included nickel-cadmium, nickel-hydrogen, silver-zinc, lithium based chemistries, and advanced technologies as they relate to high reliability operations in aerospace applications.

  2. Crew Training - Apollo 9 - Grumman Aircraft Eng. Corp. (GAEC)

    NASA Image and Video Library

    1969-01-25

    S69-17615 (25 Jan. 1969) --- Astronaut Russell L. Schweickart, lunar module pilot of the Apollo 9 prime crew, participates in a press conference at the Grumman Aircraft Engineering Corporation. Grumman is the contractor to NASA for the Lunar Module. Schweickart is holding a model of a docked Lunar Module/Command and Service Modules. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.

  3. Relational integrativity of prime-target pairs moderates congruity effects in evaluative priming.

    PubMed

    Ihmels, Max; Freytag, Peter; Fiedler, Klaus; Alexopoulos, Theodore

    2016-05-01

    In evaluative priming, positive or negative primes facilitate reactions to targets that share the same valence. While this effect is commonly explained as reflecting invariant structures in semantic long-term memory or in the sensorimotor system, the present research highlights the role of integrativity in evaluative priming. Integrativity refers to the ease of integrating two concepts into a new meaningful compound representation. In extended material tests using paired comparisons from two pools of positive and negative words, we show that evaluative congruity is highly correlated with integrativity. Therefore, in most priming studies, congruity and integrativity are strongly confounded. When both aspects are disentangled by manipulating congruity and integrativity orthogonally, three priming experiments show that evaluative-priming effects were confined to integrative prime-target pairs. No facilitation of prime-congruent targets was obtained for non-integrative stimuli. These findings are discussed from a broader perspective on priming conceived as flexible, context-dependent, and serving a generative adaptation function.

  4. Bibliography of NASA published reports on general aviation, 1975 to 1981

    NASA Technical Reports Server (NTRS)

    1981-01-01

    This bibliography lists 478 documents which relate to all heavier-than-air fixed wing aircraft exclusive of military types and those used for commercial air transport. An exception is the inclusion of commuter transport aircraft types within the general aviation category. NASA publications included in this bibliography are: conference publications (CP), reference publications (RP), technical memorandums (TM, TMX), technical notes (TN), technical papers (TP), and contractor reports (CR). In addition, papers and articles on NASA general aviation programs published by technical societies (AIAA, SAE, etc.) are included, as well as those listed in NASA's Scientific and Technical Aerospace Reports (STAR) Journal. Author and subject indexes are also provided to facilitate use of the bibliography.

  5. Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

    NASA Technical Reports Server (NTRS)

    Graham, Scott R.

    2015-01-01

    The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agency-wide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

  6. Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

    NASA Technical Reports Server (NTRS)

    Graham, Scott R.

    2014-01-01

    The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agencywide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

  7. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that... event the notice is inadequate to make a decision, advise the Contractor what additional information is...

  8. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that... event the notice is inadequate to make a decision, advise the Contractor what additional information is...

  9. NASA and Ethics: Training and Practice

    NASA Technical Reports Server (NTRS)

    Bruce, Willa Marie (Editor); Russell, Valerie (Editor)

    1997-01-01

    This paper is about the National Aeronautics and Space Administration(NASA) and the practice of professional ethics. It has been eleven years(Jan. 28, 1986) since the Challenger accident and the past decade has been a time of investigation, assessment, and finger-pointing, as well as a time for introspection and internal reform. While there has been a lot of rhetoric about ethical commitments at NASA, there has also been a dearth of empirically-based knowledge about what NASA and its various contractors are doing about professional ethics and what decisionmaking criteria are being used. It has been a decade of cost-cutting and personnel cut-backs. One has to wonder what, in all this time, NASA has done to create an ethical climate in which events like the Challenger accident are less likely to happen. In the fall of 1995, as part of competition for a mini-grant from NASA, a request for funding to complete an ethical profile of the agency was submitted. This papeR contributes to knowledge about NASA and ethics by reporting on the results of the first year of research which was spent in doing a comprehensive literature and web-site review along with phone interviews and e-mail correspondence with NASA ethics officers. The goal of this first year was to see what ethics activity has been documented and to ascertain what work is being done to raise the ethical question with NASA. Questions for which answers were sought include: (1) What is NASA now doing regarding ethics?; (2) What training is being provided? By whom? For whom?; (3) Are the answers to these questions different at different NASA installations?

  10. Problems with Primes

    ERIC Educational Resources Information Center

    Melrose, Tim; Scott, Paul

    2005-01-01

    This article discusses prime numbers, defined as integers greater than 1 that are divisible only by only themselves and the number 1. A positive integer greater than 1 that is not a prime is called composite. The number 1 itself is considered neither prime nor composite. As the name suggests, prime numbers are one of the most basic but important…

  11. Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report

    NASA Technical Reports Server (NTRS)

    Dorman, Lane

    2015-01-01

    This Corrective Measures Implementation (CMI) Progress Report, Revision 1, for Contractor's Road Heavy Equipment (CRHE) Area Solid Waste Management Unit (SWMU) Number 055 was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B, Delivery Order NNK09CA62D and Project Number PCN ENV-2324. This CMI Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site.

  12. General practitioners and the independent contractor status

    PubMed Central

    Gray, D. J. Pereira

    1977-01-01

    Primary medical care can be provided either by a bureaucratic hierarchical organization or alternatively by independent contractors. Most members of the caring professions in medicine, nursing, and social work are employed in bureaucracies, whereas general medical practitioners, general dental practitioners, opticians, and pharmacists are independent contractors. The independent contractor status has recently been heavily attacked from within the medical and nursing professions, and also from outside. It has been suggested that contracting for services is an inappropriate and anomalous way of arranging medical care, which should now be stopped. However, this process of contracting for services can be analysed, using perspectives from some of the behavioural sciences, to reveal hidden depths in the independent contractor status which suggest that the provision of primary medical care is best carried out by independent contractors. PMID:616865

  13. A Review of the NASA Textile Composites Research

    NASA Technical Reports Server (NTRS)

    Poe, C. C., Jr.; Dexter, H. B.; Raju, I. S.

    1997-01-01

    During the past 15 years NASA has taken the lead role in exploiting the benefits of textile reinforced composite materials for application to aircraft structures. The NASA Advanced Composites Technology (ACT) program was started in 1989 to develop composite primary structures for commercial transport airplanes with costs that are competitive with metal structures. As part of this program, several contractors investigated the cost, weight, and performance attributes of textile reinforced composites. Textile composites made using resin transfer molding type processes were evaluated for numerous applications. Methods were also developed to predict resin infiltration and flow in textile preforms and to predict and measure mechanical properties of the textile composites. This paper describes the salient results of that program.

  14. 41 CFR 60-741.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-741.68 Section 60-741.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... Reinstatement of ineligible contractors. (a) Application for reinstatement. A contractor debarred from further...

  15. 41 CFR 60-300.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-300.68 Section 60-300.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... ineligible contractors. (a) Application for reinstatement. A contractor debarred from further contracts for...

  16. 41 CFR 60-250.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-250.68 Section 60-250.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... ineligible contractors. (a) Application for reinstatement. A contractor debarred from further contracts for...

  17. American ASTP prime crew participate in press conference

    NASA Image and Video Library

    1975-05-14

    S75-26573 (14 May 1975) --- The three members of the American ASTP prime crew participate in an Apollo-Soyuz Test Project press conference conducted on May 14, 1975 in the Building 2 briefing room at NASA's Johnson Space Center. They are, left to right, Donald K. Slayton, docking module pilot; Vance D. Brand, command module pilot; and Thomas P. Stafford, commander. The astronauts discussed with the news media their recent ASTP joint training session in the Soviet Union, and the crew?s tour of the USSR?s Baikonur launch complex in Kazakhstan.

  18. 78 FR 54252 - Information Collection; American Recovery and Reinvestment Act-Reporting Requirements-One Time...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... Contractors AGENCY: Department of Defense (DOD), General Services Administration (GSA), and National... Requirements for Prime Contractors. DATES: Submit comments on or before November 4, 2013. ADDRESSES: Submit... Requirements-- One Time Reporting Requirements for Prime Contractors, by any of the following methods...

  19. Independent Orbiter Assessment (IOA): FMEA/CIL assessment

    NASA Technical Reports Server (NTRS)

    Hinsdale, L. W.; Swain, L. J.; Barnes, J. E.

    1988-01-01

    The McDonnell Douglas Astronautics Company (MDAC) was selected to perform an Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL). Direction was given by the Orbiter and GFE Projects Office to perform the hardware analysis and assessment using the instructions and ground rules defined in NSTS 22206. The IOA analysis featured a top-down approach to determine hardware failure modes, criticality, and potential critical items. To preserve independence, the analysis was accomplished without reliance upon the results contained within the NASA and Prime Contractor FMEA/CIL documentation. The assessment process compared the independently derived failure modes and criticality assignments to the proposed NASA post 51-L FMEA/CIL documentation. When possible, assessment issues were discussed and resolved with the NASA subsystem managers. Unresolved issues were elevated to the Orbiter and GFE Projects Office manager, Configuration Control Board (CCB), or Program Requirements Control Board (PRCB) for further resolution. The most important Orbiter assessment finding was the previously unknown stuck autopilot push-button criticality 1/1 failure mode. The worst case effect could cause loss of crew/vehicle when the microwave landing system is not active. It is concluded that NASA and Prime Contractor Post 51-L FMEA/CIL documentation assessed by IOA is believed to be technically accurate and complete. All CIL issues were resolved. No FMEA issues remain that have safety implications. Consideration should be given, however, to upgrading NSTS 22206 with definitive ground rules which more clearly spell out the limits of redundancy.

  20. 41 CFR 60-1.31 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-1.31 Section 60-1.31 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS General Enforcement; Compliance Review and Complaint Procedure § 60-1.31 Reinstatement of ineligible contractors. A contractor debarred from...

  1. ISS Logistics Hardware Disposition and Metrics Validation

    NASA Technical Reports Server (NTRS)

    Rogers, Toneka R.

    2010-01-01

    I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

  2. The 1995 NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    Brewer, J. C. (Compiler)

    1996-01-01

    This document contains the proceedings of the 28th annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center on 28-30 Nov. 1995. The workshop was attended by scientists and engineers from various agencies of the U.S. Government, aerospace contractors, and battery manufacturers, as well as international participation in like kind from a number of countries around the world. The subjects covered included nickel-cadmium, nickel-hydrogen, nickel-metal hybride, and lithium based technologies, as well as flight and ground test data. Nickel-hydrogen modeling was also covered.

  3. The 1998 NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    Brewer, Jeffrey C. (Compiler)

    1999-01-01

    This document contains the proceedings of the 31st annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center on October 27-29, 1998. The workshop was attended by scientists and engineers from various agencies of the U.S. Government, aerospace contractors, and battery manufacturers, as well as international participation in like kind from a number of countries around the world. The subjects covered included nickel-hydrogen, silver-hydrogen, nickel-metal hydride, and lithium-based technologies, as well as results from destructive physical analyses on various cell chemistries.

  4. The 1992 NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    Brewer, Jeffrey C. (Compiler)

    1993-01-01

    This document contains the proceedings of the 23rd annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center on November 15-19, 1992. The workshop was attended by scientists and engineers from various agencies of the U.S. Government, aerospace contractors, and battery manufacturers, as well as international participation in like kind from a number of countries around the world. The subjects covered included nickel-cadmium, nickel-hydrogen, nickel-metal hydride, and lithium based technologies, as well as advanced technologies including sodium-sulfur and various bipolar designs.

  5. The 1997 NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    Brewer, Jeffrey C. (Compiler)

    1998-01-01

    This document contains the proceedings of the 30th annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center on November 18-20, 1997. The workshop was attended by scientists and engineers from various agencies of the U.S. Government, aerospace contractors, and battery manufacturers, as well as international participation in like kind from a number of countries around the world. The subjects covered included nickel-cadmium, nickel-hydrogen, nickel-metal hydride, lithium, lithium-ion, and silver-zinc technologies, as well as various aspects of nickel electrode design.

  6. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employee travel... Contractor employee travel discounts. As prescribed in 951.7002, insert the following clause: Contractor Employee Travel Discounts (AUG 2009) (a) The Contractor shall take advantage of travel discounts offered to...

  7. 48 CFR 245.608 - Screening of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory. ...

  8. 48 CFR 1553.209 - Contractor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  9. 75 FR 17919 - Submission for OMB Review; American Recovery and Reinvestment Act-One-time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... Recovery and Reinvestment Act--One-time Reporting Requirements for Prime Contractors AGENCY: Department of... requirement concerning the American Recovery and Reinvestment Act--One-time Reporting Requirements for Prime... Act--One-time Reporting Requirements for Prime Contractors, in all correspondence. FOR FURTHER...

  10. 28 CFR 548.14 - Community involvement (volunteers, contractors).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., contractors). 548.14 Section 548.14 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE... Community involvement (volunteers, contractors). (a) The institution's chaplain may contract with... require a recognized representative of the faith group to verify a volunteer's or contractor's religious...

  11. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor. 1852.209-72 Section 1852.209-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one legal...

  12. 48 CFR 53.209 - Contractor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  13. The U.S. Rosetta Project: Preparations for Prime Mission, 2014

    NASA Technical Reports Server (NTRS)

    Alexander, C.; Chmielewski, A.; Aguinaldo, A. M.; Ko, A.; Accomazzo, A.; Taylor, M. G. G.

    2014-01-01

    In 2014, the International Rosetta mission will place a spacecraft in orbit around comet 67P/Churyumov-Gerasimenko and deliver a lander to the comet's surface. The National Aeronautics and Space Administration's (NASA) contribution to the International Rosetta mission, designated the U.S. Rosetta Project, includes several instruments, tracking support, and science support for some non-US payloads. In July 2011 the spacecraft was placed in a long-duration hibernation mode planned to last approximately 37 months to conserve electrical power. Rosetta will rendezvous with 67P/Churyumov-Gerasimenko in 2014. On the eve of the mission's arrival at its target, this paper highlights three issues related to Rosetta's looming prime mission: (A) measures taken in 2009 to prepare the US Rosetta Project for the long-duration hibernation mode; (B) risk reviews conducted in 2013 to prepare the US Rosetta Project for exit from hibernation; (C) ESA and NASA preparations for use of NASA Deep Space Network (DSN) assets related to keyword files.

  14. 48 CFR 1552.209-76 - Contractor performance evaluations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor performance... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002...

  15. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...

  16. 48 CFR 2936.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate construction contractor performance and prepare performance reports as required by FAR 36.201. ...

  17. 48 CFR 32.909 - Contractor inquiries.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inquiries. 32.909 Section 32.909 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Prompt Payment 32.909 Contractor inquiries. (a) Direct questions...

  18. Meeting NASA's Mission Through Commercial Partnerships

    NASA Technical Reports Server (NTRS)

    Nall, Mark

    2003-01-01

    This paper examines novel approaches to furthering NASA's missions through the use of commercial partnerships. The exploration of space ha proven to be a costly endeavor requiring the development of new technologies at significant expense. One of the prime factors holding bac the robust development of space is insufficient investment in the technologies necessary to make it a reality. The key to success in bringin needed space development technologies to maturation lies in bringing technology investors together from government, industry and academia. aggressive road map for developing space will require a diverse set of interest to industry or other government agencies. By having each invest( contributing to the part of the technology development of interest to them development of space systems can be put together at a cost far below wl would be required to develop for a stand-alone effort. The NASA Space Partnership Division has been employing this technique to leverage a 30 million dollar NASA investment into at 100 million dollar advanced technology development effort focused on meeting NASA's mission needs.

  19. PORTRAIT - PRIME AND BACKUP CREWS - ASTRONAUT EDWARD H. WHITE II

    NASA Image and Video Library

    1966-04-01

    S66-30236 (1 April 1966) --- The National Aeronautics and Space Administration (NASA) has named these astronauts as the prime crew of the first manned Apollo Space Flight. Left to right, are Edward H. White II, command module pilot; Virgil I. Grissom, mission commander; and Roger B. Chaffee, lunar module pilot. Editor's Note: Astronauts Grissom, White and Chaffee lost their lives in a Jan. 27, 1967 fire in the Apollo Command Module (CM) during testing at the launch facility.

  20. Hydrothermal syntheses, crystal structures and luminescence properties of zinc(II) and cadmium(II) coordination polymers based on bifunctional 3,2 Prime :6 Prime ,3 Prime Prime -terpyridine-4 Prime -carboxylic acid

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Na; Guo, Hui-Lin; Hu, Huai-Ming, E-mail: ChemHu1@NWU.EDU.CN

    2013-02-15

    Five new coordination polymers, [Zn{sub 2}(ctpy){sub 2}Cl{sub 2}]{sub n} (1), [Zn{sub 2}(ctpy){sub 2}(ox)(H{sub 2}O){sub 2}]{sub n} (2), [Zn{sub 2}(ctpy)(3-btc)(H{sub 2}O)]{sub n}{center_dot}0.5nH{sub 2}O (3), [Cd(ctpy){sub 2}(H{sub 2}O)]{sub n} (4), [Cd{sub 4}(ctpy){sub 2}(2-btc){sub 2}(H{sub 2}O){sub 2}]{sub n}{center_dot}2nH{sub 2}O (5), (Hctpy=3,2 Prime :6 Prime ,3 Prime Prime -terpyridine-4 Prime -carboxylic acid, H{sub 2}ox=oxalic acid, H{sub 3}(3-btc)=1,3,5-benzenetricarboxylic acid, H{sub 3}(2-btc)=1,2,4-benzenetricarboxylic acid) have been synthesized under hydrothermal conditions and characterized by elemental analysis, IR spectroscopy, and single-crystal X-ray diffraction. Compounds 1-2 are a one-dimensional chain with weak interactions to form 3D supramolecular structures. Compound 3 is a 4-nodal 3D topology framework comprised of binuclear zincmore » units and (ctpy){sup -} anions. Compound 4 shows two dimensional net. Compound 5 is a (4,5,6)-connected framework with {l_brace}4{sup 4}{center_dot}6{sup 2}{r_brace}{l_brace}4{sup 6}{center_dot}6{sup 4}{r_brace}{sub 2}{l_brace}4{sup 9}{center_dot}6{sup 6}{r_brace} topology. In addition, the thermal stabilities and photoluminescence properties of 1-5 were also studied in the solid state. - Graphical abstract: Five new Zn/Cd compounds with 3,2 Prime :6 Prime ,3 Prime Prime -terpyridine-4 Prime -carboxylic acid were prepared. The photoluminescence and thermal stabilities properties of 1-5 were investigated in the solid state. Highlights: Black-Right-Pointing-Pointer Five new zinc/cadmium metal-organic frameworks have been hydrothermal synthesized. Black-Right-Pointing-Pointer The structural variation is attributed to the diverse metal ions and auxiliary ligand. Black-Right-Pointing-Pointer Compounds 1-5 exhibit 1D ring chain, 2D layer and 3D open-framework, respectively. Black-Right-Pointing-Pointer These compounds exhibit strong solid state luminescence emission at room temperature.« less

  1. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970... management system. The Contractor's approved purchasing system and methods shall include the requirements set... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contractor purchasing...

  2. 48 CFR 2152.215-70 - Contractor records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... PRECONTRACT PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 2152.215-70 Contractor records retention. As prescribed in 2115.071, insert the following clause: Contractor Records Retention (OCT 2005...

  3. 75 FR 69037 - Medicaid Program; Recovery Audit Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-10

    ... [CMS-6034-P] RIN 0938-AQ19 Medicaid Program; Recovery Audit Contractors AGENCY: Centers for Medicare... Recovery Audit Contractors (Medicaid RACs) and the payment methodology for State payments to Medicaid RACs... RACs coordinate with other contractors and entities auditing Medicaid providers and with State and...

  4. 48 CFR 3036.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... contractor performance. (a)(2) Performance reports shall be prepared and entered into the Contractor...

  5. 48 CFR 36.506 - Superintendence by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor. 36.506 Section 36.506 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Superintendence by the contractor. The contracting officer shall insert the clause at 52.236-6, Superintendence by the Contractor, in solicitations and contracts when a fixed-price construction contract or a fixed...

  6. 48 CFR 2452.251-70 - Contractor employee travel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT 1999...

  7. 76 FR 57807 - Medicaid Program; Recovery Audit Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... for Medicare & Medicaid Services 42 CFR Part 455 Medicaid Program; Recovery Audit Contractors; Final... 42 CFR Part 455 [CMS-6034-F] RIN 0938-AQ19 Medicaid Program; Recovery Audit Contractors AGENCY... costs of Medicaid Recovery Audit Contractors (Medicaid RACs) and the payment methodology for State...

  8. 48 CFR 1652.204-70 - Contractor records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... of FEHBP Clauses 1652.204-70 Contractor records retention. As prescribed in 1604.705 the following clause will be inserted in all FEHB Program contracts. Contractor Records Retention (JUL 2005...

  9. Prime crew of Apollo/Saturn Mission 204 prepares for water egress training

    NASA Image and Video Library

    1966-10-27

    S66-58501 (27 Oct. 1966) --- The prime crew of the first manned Apollo Space Flight, Apollo/Saturn (AS) mission 204, is suited up aboard the NASA Motor Vessel Retriever (MVR) in preparation for Apollo water egress training in the Gulf of Mexico. Left to right, are astronauts Edward H. White II, senior pilot; Virgil I. Grissom, command pilot; and Roger B. Chaffee, pilot.

  10. NASA technology utilization survey on composite materials

    NASA Technical Reports Server (NTRS)

    Leeds, M. A.; Schwartz, S.; Holm, G. J.; Krainess, A. M.; Wykes, D. M.; Delzell, M. T.; Veazie, W. H., Jr.

    1972-01-01

    NASA and NASA-funded contractor contributions to the field of composite materials are surveyed. Existing and potential non-aerospace applications of the newer composite materials are emphasized. Economic factors for selection of a composite for a particular application are weight savings, performance (high strength, high elastic modulus, low coefficient of expansion, heat resistance, corrosion resistance,), longer service life, and reduced maintenance. Applications for composites in agriculture, chemical and petrochemical industries, construction, consumer goods, machinery, power generation and distribution, transportation, biomedicine, and safety are presented. With the continuing trend toward further cost reductions, composites warrant consideration in a wide range of non-aerospace applications. Composite materials discussed include filamentary reinforced materials, laminates, multiphase alloys, solid multiphase lubricants, and multiphase ceramics. New processes developed to aid in fabrication of composites are given.

  11. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  12. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  13. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  14. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  15. 48 CFR 4.102 - Contractor's signature.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor's signature. 4.102 Section 4.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Contract Execution 4.102 Contractor's signature. (a) Individuals. A contract with an...

  16. 48 CFR 253.209 - Contractor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  17. The contractor`s role in low-level waste disposal facility application review and licensing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Serie, P.J.; Dressen, A.L.

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department inmore » a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.« less

  18. Commercializing the transfer orbit stage

    NASA Technical Reports Server (NTRS)

    Miller, M. W.

    1984-01-01

    Key milestones necessary to establish the transfer orbit stage are examined. The selection of the project concept and synthesis of the company are described followed by an analysis venture capability support and the selection of a major aerospace company as prime contractor. A landmark agreement with NASA sanctioned the commercial TOS concept and provided the critical support necessary to raise the next round of venture capital. Project management and customer commitments are also discussed.

  19. Orion European Service Module (ESM) Development, Integration and Qualification Status

    NASA Technical Reports Server (NTRS)

    Berthe, Philippe; Over, Ann P.; Picardo, Michelle; Byers, Anthony W.

    2017-01-01

    ESA and the European Industry are supplying the European Service Module for Orion. An overview of the system and subsystem configuration of the Orion European Service Module (ESM) as designed and built for the EM-1 mission is provided as well as an outline of its development, assembly, integration and verification process performed by ESA and NASA in coordination with their respective Industrial prime contractors, Airbus Defence and Space and Lockheed Martin.

  20. KSC-07pd3622

    NASA Image and Video Library

    2007-12-12

    WASHINGTON, D.C. -- (From left) Brewster Shaw, vice president and genral manager of Boeing Space Exploration; Jeff Hanley, Constellation Program manager; Danny Davis, Upper Stage Element manager; Steve Cook, Ares Project manager; Doug Cooke, deputy associate administrator for Exploration Systems; and Rick Gilbrech, associate administrator for Space Exploration, stand with a model of the Ares I rocket on Dec. 12, 2007, at NASA Headquarters in Washington. NASA has selected The Boeing Company of Huntsville, Ala., as the prime contractor to produce, deliver and install avionics systsems for the Ares I rocket that will launch the Orion crew exploration vehicle into orbit. The selection is the final major contract award for Ares I. Photo credit: NASA/Paul E. Alers

  1. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: Contractor Business Systems (FEB 2012) (a) This clause only applies to covered...

  2. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: Contractor Business Systems (FEB 2012) (a) This clause only applies to covered...

  3. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: CONTRACTOR BUSINESS SYSTEMS (MAY 2011) (a) Definitions. As used in this clause...

  4. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: Contractor Business Systems (FEB 2012) (a) This clause only applies to covered...

  5. 48 CFR 53.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors. 53.209-1 Section 53.209-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209-1 Responsible prospective contractors. (a) SF 1403 (Rev. 9/88), Preaward Survey of Prospective Contractor (General). SF 1403 is authorized for...

  6. 30 CFR 874.16 - Contractor eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 874.16 Section 874.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.16 Contractor eligibility. To receive...

  7. 30 CFR 875.20 - Contractor eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 875.20 Section 875.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION CERTIFICATION AND NONCOAL RECLAMATION § 875.20 Contractor eligibility. Every...

  8. Contractor Motivation Theory and Applications.

    DTIC Science & Technology

    1981-03-01

    Project Officer, Chief, Test and Evaluation Group , US Army Procurement Research Office, ALMC. BS, Aeronautical Engineering, University of Wyoming, 1963...Contractor Motivation Theory and Applications SEE DISTRIBUTION Inclosed is a copy of subject report for your use . This report describes the DOD contractor...motivation process and various areas for improvement. In particular, it identifies effective incentives that can be used and recommends policy that

  9. 20 CFR 655.19 - Job contractor filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 3 2013-04-01 2013-04-01 false Job contractor filing requirements. 655.19... States (H-2B Workers) Application for Temporary Employment Certification Filing Procedures § 655.19 Job contractor filing requirements. (a) Provided that a job contractor and any employer-client are joint...

  10. 20 CFR 655.19 - Job contractor filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 3 2014-04-01 2014-04-01 false Job contractor filing requirements. 655.19... States (H-2B Workers) Application for Temporary Employment Certification Filing Procedures § 655.19 Job contractor filing requirements. (a) Provided that a job contractor and any employer-client are joint...

  11. 20 CFR 655.19 - Job contractor filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Job contractor filing requirements. 655.19... States (H-2B Workers) Application for Temporary Employment Certification Filing Procedures § 655.19 Job contractor filing requirements. (a) Provided that a job contractor and any employer-client are joint...

  12. 32 CFR 516.21 - Litigation against government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 3 2012-07-01 2009-07-01 true Litigation against government contractors. 516.21... government contractors. (a) General. A contract might require that the government reimburse a contractor (or... with the government requires reimbursement for adverse judgments or costs of the litigation, the SJA or...

  13. 7 CFR 3015.183 - Access to contractor records.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Access to contractor records. 3015.183 Section 3015... contractor records. The Attachment 0 requires recipients to include in specified kinds of contracts a provision for access to the contractor's records by the recipient and the Federal government. The following...

  14. 4 CFR 75.1 - Contractors' and vendors' certificates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Contractors' and vendors' certificates. 75.1 Section 75.1... BASIC VOUCHERS AND INVOICES § 75.1 Contractors' and vendors' certificates. (a) The Government... bills and invoices of contractors and vendors, with the exception that carriers, or other corporations...

  15. 75 FR 22805 - Submission for OMB Review; American Recovery and Reinvestment Act-One-Time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Recovery and Reinvestment Act--One-Time Reporting Requirements for Prime Contractors AGENCIES: Department... Recovery and Reinvestment Act--One-time Reporting Requirements for Prime Contractors published in the...

  16. Skylab 3 prime crew participate in water egress simulations at JSC

    NASA Image and Video Library

    1973-05-01

    S73-27787 (1 May 1973) --- The three members of the prime crew of the second manned Skylab mission participate in prelaunch training, specifically water egress simulations, at the Johnson Space Center (JSC), Houston. They are, left to right, astronaut Alan J. Bean, commander; scientist-astronaut Owen K. Garriott, science pilot; and astronaut Jack R. Lousma, pilot. This training took place in JSC?s Building 220 on May 1, 1973. Photo credit: NASA

  17. The 1994 27th Annual NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    Brewer, Jeffrey C. (Compiler)

    1995-01-01

    The proceedings of the 27th Annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center on November 15-17, 1994 are presented. The workshop was attended by representatives from various government agencies, as well as contractors and manufacturers, both U.S. and abroad. The subjects covered included: (1) nickel-cadium; (2) nickel-hydrogen, (3) nickel-metal hydride, and (4) lithium based technologies, as well as flight and ground test data.

  18. 48 CFR 3052.204-71 - Contractor employee access.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contractor employee access... CLAUSES Text of Provisions and Clauses 3052.204-71 Contractor employee access. As prescribed in (HSAR) 48...: Contractor Employee Access (JUN 2006) (a) “Sensitive Information,” as used in this Chapter, means any...

  19. 78 FR 51658 - Weighing, Feed, and Swine Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... RIN 0580-AA99 Weighing, Feed, and Swine Contractors AGENCY: Grain Inspection, Packers and Stockyards... and swine contractors to poultry and swine production contract growers are based on accurate weighing... reweighing to add swine contractors to the list of firms that must comply, and adding feed to the list of...

  20. Contractor Accounting, Reporting and Estimating (CARE).

    DTIC Science & Technology

    Contractor Accounting Reporting and Estimating (CARE) provides check lists that may be used as guides in evaluating the accounting system, financial reporting , and cost estimating capabilities of the contractor. Experience gained from the Management Review Technique was used as a basis for the check lists. (Author)

  1. Electrical, Electronic, and Electromechanical (EEE) parts management and control requirements for NASA space flight programs

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications

  2. SKYLAB (SL)-2 PRIME CREW - BLDG. 5 - JSC

    NASA Image and Video Library

    1973-03-20

    S73-20713 (1 March 1973) --- Astronaut Charles Conrad Jr., commander of the first manned Skylab mission, wipes perspiration from his face following an exercise session on the bicycle ergometer during Skylab training at Johnson Space Center. Conrad is in the work and experiments compartment of the crew quarters of the Skylab Orbital Workshop (OWS) trainer at JSC. In addition to being the prime exercise for the crewmen, the ergometer is also used for the vector-cardiogram test and the metabolic activity experiment. The bicycle ergometer produces measured workloads for use in determining man's metabolic effectiveness. Photo credit: NASA

  3. Littoral Combat Ship and Frigate: Congress Faced with Critical Acquisition Decisions

    DTIC Science & Technology

    2016-12-01

    D.C.: Mar. 1, 2005). 3Lockheed Martin is the prime contractor for LCS 1 and the odd numbered seaframes. For LCS 2 and LCS 4, General Dynamics was...the prime contractor for the Austal USA built ships. General Dynamics and Austal USA ended their teaming arrangement in 2010. Austal USA is the...prime contractor for the remaining even-numbered seaframes. The Course of the LCS Program Has Changed Significantly over Time Page 3 GAO

  4. 48 CFR 945.610-4 - Contractor inventory in foreign countries.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor inventory in... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 945.610-4 Contractor inventory in foreign countries. Contractor inventory located in foreign countries...

  5. 41 CFR 109-43.302-50 - Utilization by designated contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designated contractors. 109-43.302-50 Section 109-43.302-50 Public Contracts and Property Management Federal... Utilization by designated contractors. Heads of field organizations may authorize designated contractors to... Federal agency, provided the designated contractors have written policies and procedures. ...

  6. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract...

  7. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract...

  8. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract...

  9. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract...

  10. Non-cognate translation priming in masked priming lexical decision experiments: A meta-analysis.

    PubMed

    Wen, Yun; van Heuven, Walter J B

    2017-06-01

    The masked translation priming paradigm has been widely used in the last 25 years to investigate word processing in bilinguals. Motivated by studies reporting mixed findings, in particular for second language (L2) to first language (L1) translation priming, we conducted, for the first time in the literature, a meta-analysis of 64 masked priming lexical decision experiments across 24 studies to assess the effect sizes of L1-L2 and L2-L1 non-cognate translation priming effects in bilinguals. Our meta-analysis also investigated the influence of potential moderators of translation priming effects. The results provided clear evidence of significant translation priming effects for both directions, with L1-L2 translation priming significantly larger than L2-L1 translation priming (i.e., effect size of 0.86 vs. 0.31). The analyses also revealed that L1-L2 translation effect sizes were moderated by the interval between prime and target (ISI), whereas L2-L1 translation effect sizes were modulated by the number of items per cell. Theoretical and methodological implications of this meta-analysis are discussed and recommendations for future studies are provided.

  11. Reading a standing wave: figure-ground-alternation masking of primes in evaluative priming.

    PubMed

    Bermeitinger, Christina; Kuhlmann, Michael; Wentura, Dirk

    2012-09-01

    We propose a new masking technique for masking word stimuli. Drawing on the phenomena of metacontrast and paracontrast, we alternately presented two prime displays of the same word with the background color in one display matching the font color in the other display and vice versa. The sequence of twenty alterations (spanning approx. 267 ms) was sandwich-masked by structure masks. Using this masking technique, we conducted evaluative priming experiments with positive and negative target and prime words. Significant priming effects were found - for primes and targets drawn from the same as well as from different word sets. Priming effects were independent of prime discrimination performance in direct tests and they were still significant after the sample was restricted to those participants who showed random responding in the direct test. Copyright © 2012 Elsevier Inc. All rights reserved.

  12. NASA Johnson Space Center: Total quality partnership

    NASA Technical Reports Server (NTRS)

    Harlan, Charlie; Boyd, Alfred A.

    1992-01-01

    The development of and benefits realized from a joint NASA, support contractor continuous improvement process at the Johnson Space Center (JSC) is traced. The joint effort described is the Safety, Reliability, and Quality Assurance Directorate relationship with its three support contractors which began in early 1990. The Continuous Improvement effort started in early 1990 with an initiative to document and simplify numerous engineering change evaluation processes. This effort quickly grew in scope and intensity to include process improvement teams, improvement methodologies, awareness, and training. By early 1991, the support contractor had teams in place and functioning, program goals established and a cultural change effort underway. In mid-l991 it became apparent that a major redirection was needed to counter a growing sense of frustration and dissatisfaction from teams and managers. Sources of frustration were isolated to insufficient joint participation on teams, and to a poorly defined vision. Over the next year, the effort was transformed to a truly joint process. The presentation covers the steps taken to define vision, values, goals, and priorities and to form a joint Steering Committee and joint process improvement teams. The most recent assessment against the President's award criteria is presented as a summary of progress. Small, but important improvement results have already demonstrated the value of the joint effort.

  13. NASA TEERM Project: Corn Based Blast Media

    NASA Technical Reports Server (NTRS)

    Griffin, Chuck

    2009-01-01

    Coatings removal is a necessary part of the maintenance, repair, and overhaul activities at many NASA centers and contractor support sites. Sensitive substrates, such as composites and thin aluminum alloys require special handling such as the use of chemical stripping, pneumatic hand sanding, or softer blast media. Type V, acrylic based PMB is commonly used to de-coat, strip, or de-paint the delicate substrates of the Solid Rocket Boosters (SRBs) currently used in support of the Shuttle and slated to be used in support of CxP.

  14. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 1 (Adamsville, Alabama-Santa Clara, California).

    DTIC Science & Technology

    1984-01-01

    CITRONELLE TORRENT CORP THE 296 296 WERCO INC 25 25 TOTAL - CITRONELLE 321 321 CLAIBORNE ERNEST CONSTRUCTION COMPANY 57 57 COLUMBIANA CENTRAL ALABAMA FAB INC...WAINWRIGHT ENGRNO CO INC 136 136 WALLEY CONTRACTORS 89 89 WELDING SPECIALISTS INC 197 197 WHITESELL-GREEN INC 1,134 1,134 WILLIAMS BURT CONSTR RMDLG CO 192 192...ENi PR I S INC 35 35 IRUSSVILLE AMERADA HESS CORPORATION 16C 166 TUSCALOOSA WILLIAMS -MC WILLIAMS CC INC 1,200 1,200 MONTGOMERY AMERICANI STERILIZER

  15. The 1993 NASA Aerospace Battery Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brewer, J.C.

    1994-02-01

    This document contains the proceedings of the 26th annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center on 16-18 Nov. 1993. The workshop was attended by scientists and engineers from various agencies of the U.S. Government, aerospace contractors, and battery manufacturers, as well as international participation in like kind from a number of countries around the world. The subjects covered included nickel-cadmium, nickel-hydrogen, nickel-metal hydride, and lithium based technologies, as well as advanced technologies including various bipolar designs. Separate abstracts have been prepared for papers from this report.

  16. 76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... Federal Acquisition Regulation; Documenting Contractor Performance AGENCY: Department of Defense (DoD..., and to require all past performance information be entered into the Contractor Performance Assessment... Contractor Performance Information. These changes provide Governmentwide standardized evaluation factors and...

  17. RF Priming Experiments and Simulations of Magnetic Priming in Relativistic Magnetrons

    NASA Astrophysics Data System (ADS)

    White, W. M.; Gilgenbach, R. M.; Jones, M. C.; Neculaes, V. B.; Lau, Y. Y.; Jordan, N.; Pengvanich, P.; Edgar, R.; Hoff, B.; Spencer, T. A.; Price, D.

    2004-11-01

    We investigate 2 priming techniques in relativistic magnetrons for rapid startup and mode-locking: RF priming experiments with 0.1-1 MW from a 2nd magnetron; Magnetic-priming simulations by azimuthally-varying-axial magnetic field. Experiments utilize MELBA-C with a Titan 6-vane magnetron: V = -300kV, I = 1-10kA, e-beam T = 0.5 μs, microwave power = 100-500 MW, f= 1-1.3 GHz, base vacuum= 8.5 x 10-10 Torr. The AFRL RF priming magnetron is at 0.1-2 MW, 3 μsec, 1.27-1.32 GHz. About 0.2-0.3 MW is injected into 1 of 3 open coupling slots in the relativistic magnetron. Analysis of the relativistic magnetron's microwave output shows a clear effect of RF priming. Simulations of magnetic priming in the pi-mode are run in MAGIC code by imposing N/2 azimuthal-variations in the axial magnetic field of an N-vane magnetron. Faster startup and mode-locking are simulated by rapid-electron spoke formation and excitation of RF fields.

  18. Debarment and suspension. [of contractors

    NASA Technical Reports Server (NTRS)

    Whelan, Thomas J.

    1987-01-01

    The changing Government attitude toward contractor debarment and suspension is examined, with emphasis on the fact that the Government is more alert to fraud, waste, and abuse. Consideration is given to causes of debarment or suspension, procedures and due process hearings, settlement agreements, compliance programs, and recent related legislation. It is concluded that the change in the Government contracting environment in recent years should be sufficient incentive for contractors to monitor their operations more closely.

  19. Benefit from NASA

    NASA Image and Video Library

    1999-01-01

    The same rocket fuel that helps power the Space Shuttle as it thunders into orbit will now be taking on a new role, with the potential to benefit millions of people worldwide. Leftover rocket fuel from NASA is being used to make a flare that destroys land mines where they were buried, without using explosives. The flare is safe to handle and easy to use. People working to deactivate the mines simply place the flare next to the uncovered land mine and ignite it from a safe distance using a battery-triggered electric match. The flare burns a hole in the land mine's case and ignites its explosive contents. The explosive burns away, disabling the mine and rendering it harmless. Using leftover rocket fuel to help destroy land mines incurs no additional costs to taxpayers. To ensure enough propellant is available for each Shuttle mission, NASA allows for a small percentage of extra propellant in each batch. Once mixed, surplus fuel solidifies and carnot be saved for use in another launch. In its solid form, it is an ideal ingredient for the new flare. The flare was developed by Thiokol Propulsion in Brigham City, Utah, the NASA contractor that designs and builds rocket motors for the Solid Rocket Booster Space Shuttle. An estimated 80 million or more active land mines are scattered around the world in at least 70 countries, and kill or maim 26,000 people a year. Worldwide, there is one casualty every 22 minutes

  20. Supreme Court Hears Privacy Case Between NASA and Jet Propulsion Laboratory Scientists

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2010-10-01

    After NASA put into practice the 2004 Homeland Security Presidential Directive-12, known as HSPD-12, Dennis Byrnes talked to then-NASA administrator Michael Griffin. Byrnes recalls that Griffin told him in 2007 that if he didn’t like the agency's implementation of HSPD-12, he should go to court. That's exactly what Byrnes, an employee of the California Institute of Technology (Caltech) working as a senior engineer at NASA's Jet Propulsion Laboratory (JPL) in Pasadena, Calif., did. Concerned about prying and open-ended background investigations of federal contractors through NASA's implementation of HSPD-12, he, along with lead plaintiff Robert Nelson and 26 other Caltech employees working at JPL, sued NASA. Following several lower court decisions, including an injunction issued by a U.S. federal appeals court in response to a plaintiff motion, the case made it all the way to the U.S. Supreme Court, which heard oral arguments on 5 October.

  1. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 4 Accounts 1 2011-01-01 2011-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  2. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 4 Accounts 1 2013-01-01 2013-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  3. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 4 Accounts 1 2012-01-01 2012-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  4. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 4 Accounts 1 2014-01-01 2013-01-01 true Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  5. NASA Handbook for Spacecraft Structural Dynamics Testing

    NASA Technical Reports Server (NTRS)

    Kern, Dennis L.; Scharton, Terry D.

    2005-01-01

    Recent advances in the area of structural dynamics and vibrations, in both methodology and capability, have the potential to make spacecraft system testing more effective from technical, cost, schedule, and hardware safety points of view. However, application of these advanced test methods varies widely among the NASA Centers and their contractors. Identification and refinement of the best of these test methodologies and implementation approaches has been an objective of efforts by the Jet Propulsion Laboratory on behalf of the NASA Office of the Chief Engineer. But to develop the most appropriate overall test program for a flight project from the selection of advanced methodologies, as well as conventional test methods, spacecraft project managers and their technical staffs will need overall guidance and technical rationale. Thus, the Chief Engineer's Office has recently tasked JPL to prepare a NASA Handbook for Spacecraft Structural Dynamics Testing. An outline of the proposed handbook, with a synopsis of each section, has been developed and is presented herein. Comments on the proposed handbook are solicited from the spacecraft structural dynamics testing community.

  6. NASA Handbook for Spacecraft Structural Dynamics Testing

    NASA Technical Reports Server (NTRS)

    Kern, Dennis L.; Scharton, Terry D.

    2004-01-01

    Recent advances in the area of structural dynamics and vibrations, in both methodology and capability, have the potential to make spacecraft system testing more effective from technical, cost, schedule, and hardware safety points of view. However, application of these advanced test methods varies widely among the NASA Centers and their contractors. Identification and refinement of the best of these test methodologies and implementation approaches has been an objective of efforts by the Jet Propulsion Laboratory on behalf of the NASA Office of the Chief Engineer. But to develop the most appropriate overall test program for a flight project from the selection of advanced methodologies, as well as conventional test methods, spacecraft project managers and their technical staffs will need overall guidance and technical rationale. Thus, the Chief Engineer's Office has recently tasked JPL to prepare a NASA Handbook for Spacecraft Structural Dynamics Testing. An outline of the proposed handbook, with a synopsis of each section, has been developed and is presented herein. Comments on the proposed handbook is solicited from the spacecraft structural dynamics testing community.

  7. The Contractor's Role in Competitive Bid Construction.

    ERIC Educational Resources Information Center

    Toy, G. Arlan

    1986-01-01

    In a competitive bid situation, the general contractor's first priority is controlling construction costs. The actions the general contractor take focus on adequate control, effective communication, efficient use of resources, and prevention of delays. (MLF)

  8. 76 FR 60838 - Debarment, Suspension, and Ineligibility of Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... GOVERNMENT ACCOUNTABILITY OFFICE Debarment, Suspension, and Ineligibility of Contractors AGENCY... of government contractors. As a legislative branch agency, GAO is not subject to the requirements of... (hereinafter, contractors) who are responsible. However, GAO's Procurement Order has not explicitly referenced...

  9. 78 FR 12106 - Debarment, Suspension, and Ineligibility of Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ... OFFICE OF PERSONNEL MANAGEMENT Debarment, Suspension, and Ineligibility of Contractors AGENCY: U.S... Acquisition Regulation (FAR) regarding the debarment, suspension, and ineligibility of government contractors... ensure that it contracts only with those entities and individuals (hereinafter, contractors) who are...

  10. Navy Virginia (SSN 774) Class Attack Submarine Procurement: Background and Issues for Congress

    DTIC Science & Technology

    2016-10-25

    proposed plan include the following:  GD/EB is to be the prime contractor for designing and building Ohio replacement boats;  HII/NNS is to be a...boats, and HII/NNS would receive 22%-23%;  GD/EB is to continue as prime contractor for the Virginia-class program, but to help balance out projected...execute this strategy, GDEB has been selected as the prime contractor for OR with the responsibilities to deliver the twelve OR [Ohio replacement

  11. 77 FR 7579 - Debarment, Suspension, and Ineligibility of Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... GOVERNMENT ACCOUNTABILITY OFFICE Debarment, Suspension, and Ineligibility of Contractors AGENCY... government contractors. Comments on GAO's policy were due on or before November 14, 2011. GAO received two... debarment, suspension, and ineligibility of government contractors. Neither comment suggested any changes to...

  12. Private Security Contractors: The Other Force

    DTIC Science & Technology

    2011-03-22

    improving PSC oversight. This paper will not address private contractors conducting Police force training , governmental use of PSCs outside of Iraq...theater entry requirements, conduct mandatory training , conduct weapons training and qualification and conduct security verification and criminal...an effective oversight program including contractor deployment tracking, limited contract oversight personnel, and untrained Contract Officer

  13. A New Way of Doing Business: Reusable Launch Vehicle Advanced Thermal Protection Systems Technology Development: NASA Ames and Rockwell International Partnership

    NASA Technical Reports Server (NTRS)

    Carroll, Carol W.; Fleming, Mary; Hogenson, Pete; Green, Michael J.; Rasky, Daniel J. (Technical Monitor)

    1995-01-01

    NASA Ames Research Center and Rockwell International are partners in a Cooperative Agreement (CA) for the development of Thermal Protection Systems (TPS) for the Reusable Launch Vehicle (RLV) Technology Program. This Cooperative Agreement is a 30 month effort focused on transferring NASA innovations to Rockwell and working as partners to advance the state-of-the-art in several TPS areas. The use of a Cooperative Agreement is a new way of doing business for NASA and Industry which eliminates the traditional customer/contractor relationship and replaces it with a NASA/Industry partnership.

  14. James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Development Status

    NASA Technical Reports Server (NTRS)

    Feinberg, Lee D.

    2004-01-01

    The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is a segmented, cryogenic telescope scheduled for launch in 2011. In September of 2002, NASA selected prime contractor Northrop Grumman Space Technology (NGST) to build the observatory including management of the OTE. NGST is teamed with subcontractors Ball Aerospace, Alliant Techsystems (ATK). and Kodak. The team has completed several significant design, technology, architecture definition, and manufacturing milestones in the past year that are summarized in this paper.

  15. 41 CFR 109-45.300-50 - Sales by designated contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contractors. 109-45.300-50 Section 109-45.300-50 Public Contracts and Property Management Federal Property... § 109-45.300-50 Sales by designated contractors. Sales of surplus contractor inventory will be conducted by designated contractors when heads of field organizations determine that it is in the best interest...

  16. 48 CFR 2110.7002 - Contractor investment of FEGLI Program funds.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Contractor investment of FEGLI Program funds. (a) The Contractor is required to invest and reinvest all FEGLI... Contractor is required to credit income earned from its investment of FEGLI Program funds to the FEGLI... appropriate manner. If the Contractor fails to invest funds on hand, properly allocate investment income, or...

  17. A Paradox of Syntactic Priming: Why Response Tendencies Show Priming for Passives, and Response Latencies Show Priming for Actives

    PubMed Central

    Segaert, Katrien; Menenti, Laura; Weber, Kirsten; Hagoort, Peter

    2011-01-01

    Speakers tend to repeat syntactic structures across sentences, a phenomenon called syntactic priming. Although it has been suggested that repeating syntactic structures should result in speeded responses, previous research has focused on effects in response tendencies. We investigated syntactic priming effects simultaneously in response tendencies and response latencies for active and passive transitive sentences in a picture description task. In Experiment 1, there were priming effects in response tendencies for passives and in response latencies for actives. However, when participants' pre-existing preference for actives was altered in Experiment 2, syntactic priming occurred for both actives and passives in response tendencies as well as in response latencies. This is the first investigation of the effects of structure frequency on both response tendencies and latencies in syntactic priming. We discuss the implications of these data for current theories of syntactic processing. PMID:22022352

  18. 48 CFR 47.305-15 - Loading responsibilities of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Loading responsibilities of contractors. 47.305-15 Section 47.305-15 Federal Acquisition Regulations System FEDERAL... responsibilities of contractors. (a)(1) Contractors are responsible for loading, blocking, and bracing carload...

  19. 77 FR 6676 - Office of Inspector General; Contractor Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-09

    ... POSTAL SERVICE 39 CFR Part 230 Office of Inspector General; Contractor Requirements AGENCY: Postal... for contractors employed by the Office of Inspector General. The rule also emphasizes consistency in contractor selection, and clarifies the OIG's exclusive authority to set qualifications and standards for its...

  20. 41 CFR 109-40.000-50 - Applicability to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contractors. 109-40.000-50 Section 109-40.000-50 Public Contracts and Property Management Federal Property...-50 Applicability to contractors. DOE-PMR 109-40, Transportation and Traffic Management, should be applied to cost-type contractors' transportation and traffic management activities. Departure by cost-type...

  1. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of the...

  2. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of the...

  3. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of the...

  4. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of the...

  5. Survey of university programs in remote sensing funded under grants from the NASA University-Space Applications program

    NASA Technical Reports Server (NTRS)

    Madigan, J. A.; Earhart, R. W.

    1978-01-01

    NASA's Office of Space and Terrestrial Applications (OSTA) is currently assessing approaches to transferring NASA technology to both the public and private sectors. As part of this assessment, NASA is evaluating the effectiveness of an ongoing program in remote sensing technology transfer conducted by 20 university contractors/grantees, each supported totally or partially by NASA funds. The University-Space Applications program has as its objective the demonstration of practical benefits from the use of remote sensing technology to a broad spectrum of new users, principally in state and local governments. To evaluate the University-Space Applications program, NASA has a near-term requirement for data on each university effort including total funding, funding sources, length of program, program description, and effectiveness measures.

  6. Aero-acoustic performance comparison of core engine noise suppressors on NASA quiet engine C

    NASA Technical Reports Server (NTRS)

    Bloomer, H. E.; Schaefer, J. W.

    1977-01-01

    The relative aero-acoustic effectiveness of two core engine suppressors, a contractor-designed suppressor delivered with the Quiet Engine, and a NASA-designed suppressor was evaluated. The NASA suppressor was tested with and without a splitter making a total of three configurations being reported in addition to the baseline hardwall case. The aerodynamic results are presented in terms of tailpipe pressure loss, corrected net thrust, and corrected specific fuel consumption as functions of engine power setting. The acoustic results are divided into duct and far-field acoustic data. The NASA-designed core suppressor did the better job of suppressing aft end noise, but the splitter associated with it caused a significant engine performance penality. The NASA core suppressor without the spltter suppressed most of the core noise without any engine performance penalty.

  7. 48 CFR 970.0407 - Contractor records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...

  8. At the Cosmonaut Hotel in Baikonur, Kazakhstan, Expedition 48-49 prime crewmember Kate Rubins of NASA (left) and her backup, NASA���s Peggy Whitson (right) share a game of chess June 30 during pre-launch activities. Rubins, Anatoly Ivanishin of Roscosmos and Takuya Onishi of the Japan Aerospace Exploration Agency, will launch July 7, Baikonur time, on the Soyuz MS-01 spacecraft for a planned four-month mission on the International Space Station...NASA/Alexander Vysotsky.

    NASA Image and Video Library

    2016-06-30

    At the Cosmonaut Hotel in Baikonur, Kazakhstan, Expedition 48-49 prime crewmember Kate Rubins of NASA (left) and her backup, NASA’s Peggy Whitson (right) share a game of chess June 30 during pre-launch activities. Rubins, Anatoly Ivanishin of Roscosmos and Takuya Onishi of the Japan Aerospace Exploration Agency, will launch July 7, Baikonur time, on the Soyuz MS-01 spacecraft for a planned four-month mission on the International Space Station. NASA/Alexander Vysotsky

  9. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... rulemaking (NOPR) to revise existing regulations covering contractor legal management requirements and make... relating to the DOE notice of proposed rulemaking to revise existing regulations covering contractor legal...

  10. 48 CFR 2452.237-75 - Clearance of contractor personnel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Clearance of contractor... Clauses 2452.237-75 Clearance of contractor personnel. As prescribed in 2437.110(e), insert the following clause in solicitations and contracts. Clearance of Contractor Personnel (OCT 1999) (a) General. This...

  11. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  12. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime... the subcontract for any reason, the recipient must require the prime contractor to employ the six good...

  13. Subliminal semantic priming in speech.

    PubMed

    Daltrozzo, Jérôme; Signoret, Carine; Tillmann, Barbara; Perrin, Fabien

    2011-01-01

    Numerous studies have reported subliminal repetition and semantic priming in the visual modality. We transferred this paradigm to the auditory modality. Prime awareness was manipulated by a reduction of sound intensity level. Uncategorized prime words (according to a post-test) were followed by semantically related, unrelated, or repeated target words (presented without intensity reduction) and participants performed a lexical decision task (LDT). Participants with slower reaction times in the LDT showed semantic priming (faster reaction times for semantically related compared to unrelated targets) and negative repetition priming (slower reaction times for repeated compared to semantically related targets). This is the first report of semantic priming in the auditory modality without conscious categorization of the prime.

  14. Subliminal Semantic Priming in Speech

    PubMed Central

    Tillmann, Barbara; Perrin, Fabien

    2011-01-01

    Numerous studies have reported subliminal repetition and semantic priming in the visual modality. We transferred this paradigm to the auditory modality. Prime awareness was manipulated by a reduction of sound intensity level. Uncategorized prime words (according to a post-test) were followed by semantically related, unrelated, or repeated target words (presented without intensity reduction) and participants performed a lexical decision task (LDT). Participants with slower reaction times in the LDT showed semantic priming (faster reaction times for semantically related compared to unrelated targets) and negative repetition priming (slower reaction times for repeated compared to semantically related targets). This is the first report of semantic priming in the auditory modality without conscious categorization of the prime. PMID:21655277

  15. NASA Technical Management Report (533Q)

    NASA Technical Reports Server (NTRS)

    Klosko, S. M.; Sanchez, B. (Technical Monitor)

    2001-01-01

    The objective of this task is analytical support of the NASA Satellite Laser Ranging (SLR) program in the areas of SLR data analysis, software development, assessment of SLR station performance, development of improved models for atmospheric propagation and interpretation of station calibration techniques, and science coordination and analysis functions for the NASA led Central Bureau of the International Laser Ranging Service (ILRS). The contractor shall in each year of the five year contract: (1) Provide software development and analysis support to the NASA SLR program and the ILRS. Attend and make analysis reports at the monthly meetings of the Central Bureau of the ILRS covering data received during the previous period. Provide support to the Analysis Working Group of the ILRS including special tiger teams that are established to handle unique analysis problems. Support the updating of the SLR Bibliography contained on the ILRS web site; (2) Perform special assessments of SLR station performance from available data to determine unique biases and technical problems at the station; (3) Develop improvements to models of atmospheric propagation and for handling pre- and post-pass calibration data provided by global network stations; (4) Provide review presentation of overall ILRS network data results at one major scientific meeting per year; (5) Contribute to and support the publication of NASA SLR and ILRS reports highlighting the results of SLR analysis activity.

  16. 75 FR 3977 - Addressing Tax Delinquency by Government Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... Contractors #0; #0; #0; Presidential Documents #0; #0; #0;#0;Federal Register / Vol. 75, No. 15 / Monday... of January 20, 2010 Addressing Tax Delinquency by Government Contractors Memorandum for the Heads of... contractors and has an important obligation to protect American taxpayer money and the integrity of the...

  17. 76 FR 81408 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... Energy (DOE or Department) is proposing to revise existing regulations covering contractor legal... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  18. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952, and 970 RIN 1990-AA37 Contractor Legal.... ACTION: Final rule. SUMMARY: The Department of Energy revises existing regulations covering contractor... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  19. 48 CFR 52.236-6 - Superintendence by the Contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor. 52.236-6 Section 52.236-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....236-6 Superintendence by the Contractor. As prescribed in 36.506, insert the following clause: Superintendence by the Contractor (APR 1984) At all times during performance of this contract and until the work...

  20. 48 CFR 752.7013 - Contractor-mission relationships.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas... contract, and for advising USAID regarding the performance of the work under the contract and its effect on... of academic freedom. Notwithstanding these academic freedoms, the Contractor's employees, while in...

  1. Aerospace Safety Advisory Panel

    NASA Technical Reports Server (NTRS)

    1984-01-01

    An assessment of NASA's safety performance for 1983 affirms that NASA Headquarters and Center management teams continue to hold the safety of manned flight to be their prime concern, and that essential effort and resources are allocated for maintaining safety in all of the development and operational programs. Those conclusions most worthy of NASA management concentration are given along with recommendations for action concerning; product quality and utility; space shuttle main engine; landing gear; logistics and management; orbiter structural loads, landing speed, and pitch control; the shuttle processing contractor; and the safety of flight operations. It appears that much needs to be done before the Space Transportation System can achieve the reliability necessary for safe, high rate, low cost operations.

  2. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  3. 48 CFR 227.7108 - Contractor data repositories.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established... procedures for protecting technical data delivered to or stored at the repository from unauthorized release... disclosure of technical data from the repository to third parties consistent with the Government's rights in...

  4. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  5. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  6. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  7. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  8. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  9. 48 CFR 1437.7001 - Contractor qualification requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  10. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...

  11. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...

  12. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...

  13. Electrophysiology reveals semantic priming at a short SOA irrespective of depth of prime processing.

    PubMed

    Küper, Kristina; Heil, Martin

    2009-04-03

    The otherwise robust behavioral semantic priming effect is reduced to the point of being absent when a letter search has to be performed on the prime word. As a result the automaticity of semantic activation has been called into question. It is unclear, however, in how far automatic processes are even measurable in the letter search priming paradigm as the prime task necessitates a long prime-probe stimulus-onset asynchrony (SOA). In a modified procedure, a short SOA can be realized by delaying the prime task response until after participants have made a lexical decision on the probe. While the absence of lexical decision priming has already been demonstrated in this design it seems premature to draw any definite conclusions from this purely behavioral result since event related potential (ERP) measures have been shown to be a more sensitive index of semantic activation. Using the modified paradigm we thus recorded ERP in addition to lexical decision times. Stimuli were presented at two different SOAs (240 ms vs. 840 ms) and participants performed either a grammatical discrimination (Experiment 1) or a letter search (Experiment 2) on the prime. Irrespective of prime task, the modulation of the N400, the ERP correlate of semantic activation, provided clear-cut evidence of semantic processing at the short SOA. Implications for theories of semantic activation as well as the constraints of the delayed prime task procedure are discussed.

  14. Customer interviews to improve NASA office of space science education and public outreach leveraging success

    NASA Technical Reports Server (NTRS)

    Lowes, L. L.

    2002-01-01

    Leveraging with organizations that serve our customers and focusing on the needs of those organizations are two prime elements of the NASA Office of Space Science (OSS) Education and Public Outreach (E/PO) Strategy. On behalf of NASA OSS, the Solar System Exploration (SSE) Education and Public Outreach Forum has conducted a series of customer interviews with representatives from leading organizations who serve some of the audiences we wish to reach.

  15. The TPS Advanced Development Project for CEV

    NASA Technical Reports Server (NTRS)

    Reuther, James; Wercinski, Paul; Venkatapathy, Ethiraj; Ellerby, Don; Raiche, George; Bowman, Lynn; Jones, Craig; Kowal, John

    2006-01-01

    The CEV TPS Advanced Development Project (ADP) is a NASA in-house activity for providing two heatshield preliminary designs (a Lunar direct return as well as a LEO only return) for the CEV, including the TPS, the carrier structure, the interfaces and the attachments. The project s primary objective is the development of a single heatshield preliminary design that meets both Lunar direct return and LEO return requirements. The effort to develop the Lunar direct return capable heatshield is considered a high risk item for the NASA CEV development effort due to the low TRL (approx. 4) of the candidate TPS materials. By initiating the TPS ADP early in the development cycle, the intent is to use materials analysis and testing in combination with manufacturing demonstrations to reduce the programmatic risk of using advanced TPS technologies in the critical path for CEV. Due to the technical and schedule risks associated a Lunar return heatshield, the ADP will pursue a parallel path design approach, whereby a back-up TPS/heatshield design that only meets LEO return requirements is also developed. The TPS materials and carrier structure design concept selections will be based on testing, analysis, design and evaluation of scalability and manufacturing performed under the ADP. At the TPS PDR, the preferred programmatic strategy is to transfer the continued (detailed) design, development, testing and evaluation (DDT&E) of both the Lunar direct and LEO return designs to a government/prime contractor coordinated sub-system design team. The CEV prime contractor would have responsibility for the continued heatshield sub-system development. Continued government participation would include analysis, testing and evaluation as well as decision authority at TPS Final System Decision (FSD) (choosing between the primary and back-up heatshields) occurring between TPS PDR and TPS Critical Design Review (CDR). After TPS FSD the prime CEV contractor will complete the detailed design

  16. Cognate status and cross-script translation priming.

    PubMed

    Voga, Madeleine; Grainger, Jonathan

    2007-07-01

    Greek-French bilinguals were tested in three masked priming experiments with Greek primes and French targets. Related primes were the translation equivalents of target words, morphologically related to targets, or phonologically related to targets. In Experiment 1, cognate translation equivalents (phonologically similar translations) showed facilitatory priming, relative to matched phonologically related primes, in conditions in which morphologically related primes showed no effect (50-msec prime exposure). Cross-language morphological priming emerged at longer prime exposure durations (66 msec), but cognate primes continued to generate more priming than did those in the morphological condition. In Experiments 2 and 3, the level of phonological overlap across translation equivalents was varied, and priming effects were measured against those for matched phonologically related primes and those in an unrelated prime condition. When measured against the unrelated baseline, cognate primes showed the typical advantage over noncognate primes. However, this cognate advantage disappeared when priming was measured against the phonologically related prime condition. The results are discussed in terms of how translation equivalents are represented in bilingual memory.

  17. False memories and lexical decision: even twelve primes do not cause long-term semantic priming.

    PubMed

    Zeelenberg, René; Pecher, Diane

    2002-03-01

    Semantic priming effects are usually obtained only if the prime is presented shortly before the target stimulus. Recent evidence obtained with the so-called false memory paradigm suggests, however, that in both explicit and implicit memory tasks semantic relations between words can result in long-lasting effects when multiple 'primes' are presented. The aim of the present study was to investigate whether these effects would generalize to lexical decision. In four experiments we showed that even as many as 12 primes do not cause long-term semantic priming. In all experiments, however, a repetition priming effect was obtained. The present results are consistent with a number of other results showing that semantic information plays a minimal role in long-term priming in visual word recognition.

  18. Battlefield Contractors: Operational Risk and System Support Contractors

    DTIC Science & Technology

    2010-10-27

    incentive for the use of contractors is the proven cost savings when compared to similarly trained active duty military forces. The Office of...no military or government civilian is trained to do. The reality is that “modern military operations now depend heavily on high-tech weapons systems...squadrons that rely exclusively on contracted line maintenance, with no military personnel trained to support the aircraft. Defense supplemental funds

  19. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise... of such data and information as Food and Drug Administration employees. (b) A written agreement between the Food and Drug Administration and any contractor shall be entered into before data and...

  20. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise... of such data and information as Food and Drug Administration employees. (b) A written agreement between the Food and Drug Administration and any contractor shall be entered into before data and...