Sample records for nasa-ksc lifting devices

  1. NASA safety standard for lifting devices and equipment

    NASA Astrophysics Data System (ADS)

    1990-09-01

    NASA's minimum safety requirements are established for the design, testing, inspection, maintenance, certification, and use of overhead and gantry cranes (including top running monorail, underhung, and jib cranes), mobile cranes, derrick hoists, and special hoist supported personnel lifting devices (these do not include elevators, ground supported personnel lifts, or powered platforms). Minimum requirements are also addressed for the testing, inspection, and use of Hydra-sets, hooks, and slings. Safety standards are thoroughly detailed.

  2. NASA safety standard for lifting devices and equipment

    NASA Technical Reports Server (NTRS)

    1990-01-01

    NASA's minimum safety requirements are established for the design, testing, inspection, maintenance, certification, and use of overhead and gantry cranes (including top running monorail, underhung, and jib cranes), mobile cranes, derrick hoists, and special hoist supported personnel lifting devices (these do not include elevators, ground supported personnel lifts, or powered platforms). Minimum requirements are also addressed for the testing, inspection, and use of Hydra-sets, hooks, and slings. Safety standards are thoroughly detailed.

  3. Advanced underwater lift device

    NASA Technical Reports Server (NTRS)

    Flanagan, David T.; Hopkins, Robert C.

    1993-01-01

    Flexible underwater lift devices ('lift bags') are used in underwater operations to provide buoyancy to submerged objects. Commercially available designs are heavy, bulky, and awkward to handle, and thus are limited in size and useful lifting capacity. An underwater lift device having less than 20 percent of the bulk and less than 10 percent of the weight of commercially available models was developed. The design features a dual membrane envelope, a nearly homogeneous envelope membrane stress distribution, and a minimum surface-to-volume ratio. A proof-of-concept model of 50 kg capacity was built and tested. Originally designed to provide buoyancy to mock-ups submerged in NASA's weightlessness simulators, the device may have application to water-landed spacecraft which must deploy flotation upon impact, and where launch weight and volume penalties are significant. The device may also be useful for the automated recovery of ocean floor probes or in marine salvage applications.

  4. A NASA helicopter lifts off from KSC after being painted

    NASA Technical Reports Server (NTRS)

    2000-01-01

    At S.R. 3 a NASA helicopter lifts off to return to Patrick Air Force Base. The helicopter is one of four UH-1H helicopters that have had its blades painted, changing the previous black color to a pattern of white and yellow stripes. The pattern provides better visibility in smoke and fire conditions. When the rotors are turning, the stripes create a yellow and white circle that is more easily seen by a second helicopter from above. The helicopters, primarily used for security and medical evacuation for NASA, will be used to deliver water via buckets during brush fires. The change was made to comply with U.S. Fish and Wildlife and Department of Forestry regulations for helicopter-assisted fire control.

  5. STS-1 - LAUNCH - KSC

    NASA Image and Video Library

    1981-04-15

    The Space Shuttle Columbia begins a new era of space transportation when it lifts off from NASA Kennedy Space Center (KSC). The reusable Orbiter, its two (2) fuel tanks and two (2) Solid Rocket Boosters (SRB) has just cleared the launch tower. Aboard the spacecraft are Astronauts John W. Young, Commander, and Robert L. Crippen, Pilot . 1. STS-I - LAUNCH KSC, FL KSC, FL Also available in 4x5 BW

  6. Deep Space Climate Observatory (DSCOVR) lifted off from Cape Canaveral

    NASA Image and Video Library

    2015-02-13

    Open Image KSC-2015-1368.KSC-2015-1368 (02/11/2015) --- The SpaceX Falcon 9 rocket carrying NOAA’s Deep Space Climate Observatory spacecraft, or DSCOVR, lifts off from Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida. Liftoff occurred at 6:03 p.m. EST. DSCOVR is a partnership between NOAA, NASA and the U.S. Air Force, and will maintain the nation's real-time solar wind monitoring capabilities. To learn more about DSCOVR, visit www.nesdis.noaa.gov/DSCOVR. Photo credit: NASA/Tony Gray and Tim Powers

  7. NASA Heavy Lift Rotorcraft Systems Investigation

    NASA Technical Reports Server (NTRS)

    Johnson, Wayne; Yamauchi, Gloria K.; Watts, Michael E.

    2005-01-01

    The NASA Heavy Lift Rotorcraft Systems Investigation examined in depth several rotorcraft configurations for large civil transport, designed to meet the technology goals of the NASA Vehicle Systems Program. The investigation identified the Large Civil Tiltrotor as the configuration with the best potential to meet the technology goals. The design presented was economically competitive, with the potential for substantial impact on the air transportation system. The keys to achieving a competitive aircraft were low drag airframe and low disk loading rotors; structural weight reduction, for both airframe and rotors; drive system weight reduction; improved engine efficiency; low maintenance design; and manufacturing cost comparable to fixed-wing aircraft. Risk reduction plans were developed to provide the strategic direction to support a heavy-lift rotorcraft development. The following high risk areas were identified for heavy lift rotorcraft: high torque, light weight drive system; high performance, structurally efficient rotor/wing system; low noise aircraft; and super-integrated vehicle management system.

  8. 14 CFR 23.345 - High lift devices.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false High lift devices. 23.345 Section 23.345 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... lift devices. (a) If flaps or similar high lift devices are to be used for takeoff, approach or landing...

  9. 14 CFR 23.345 - High lift devices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false High lift devices. 23.345 Section 23.345 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... lift devices. (a) If flaps or similar high lift devices are to be used for takeoff, approach or landing...

  10. 14 CFR 25.345 - High lift devices.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false High lift devices. 25.345 Section 25.345... STANDARDS: TRANSPORT CATEGORY AIRPLANES Structure Flight Maneuver and Gust Conditions § 25.345 High lift...) A head-on gust of 25 feet per second velocity (EAS). (c) If flaps or other high lift devices are to...

  11. 14 CFR 25.345 - High lift devices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false High lift devices. 25.345 Section 25.345... STANDARDS: TRANSPORT CATEGORY AIRPLANES Structure Flight Maneuver and Gust Conditions § 25.345 High lift...) A head-on gust of 25 feet per second velocity (EAS). (c) If flaps or other high lift devices are to...

  12. High-Lift Propeller System Configuration Selection for NASA's SCEPTOR Distributed Electric Propulsion Flight Demonstrator

    NASA Technical Reports Server (NTRS)

    Patterson, Michael D.; Derlaga, Joseph M.; Borer, Nicholas K.

    2016-01-01

    Although the primary function of propellers is typically to produce thrust, aircraft equipped with distributed electric propulsion (DEP) may utilize propellers whose main purpose is to act as a form of high-lift device. These \\high-lift propellers" can be placed upstream of wing such that, when the higher-velocity ow in the propellers' slipstreams interacts with the wing, the lift is increased. This technique is a main design feature of a new NASA advanced design project called Scalable Convergent Electric Propulsion Technology Operations Research (SCEPTOR). The goal of the SCEPTOR project is design, build, and y a DEP aircraft to demonstrate that such an aircraft can be much more ecient than conventional designs. This paper provides details into the high-lift propeller system con guration selection for the SCEPTOR ight demonstrator. The methods used in the high-lift propeller system conceptual design and the tradeo s considered in selecting the number of propellers are discussed.

  13. 14 CFR 25.697 - Lift and drag devices, controls.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.697 Lift and drag devices, controls. (a) Each lift device control must be designed so that the pilots... drag device control must be designed and located to make inadvertent operation improbable. Lift and...

  14. 14 CFR 25.697 - Lift and drag devices, controls.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.697 Lift and drag devices, controls. (a) Each lift device control must be designed so that the pilots... drag device control must be designed and located to make inadvertent operation improbable. Lift and...

  15. 14 CFR 25.697 - Lift and drag devices, controls.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.697 Lift and drag devices, controls. (a) Each lift device control must be designed so that the pilots... drag device control must be designed and located to make inadvertent operation improbable. Lift and...

  16. 14 CFR 25.697 - Lift and drag devices, controls.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.697 Lift and drag devices, controls. (a) Each lift device control must be designed so that the pilots... drag device control must be designed and located to make inadvertent operation improbable. Lift and...

  17. A Model for NASA-KSC's Privatization Transition

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.; Krumwiede, Dennis W.; Flowers, Jean

    1996-01-01

    This paper describes a model for government agencies that are considering privatization of all or part of their functions. Privatization encompasses the transitioning of government functions from government run to contractor run. The model developed in this paper is used to analyze the National Aeronautics and Space Administration's (NASA) decision to privatize space shuttle operations at the Kennedy Space Center (KSC). Several specific recommendations are given to KSC as they attempt to operationalize this privatization decision at the Center and to transition to a new relationship with their contractors.

  18. Deep Space Climate Observatory (DSCOVR) lifted off from Cape Canaveral

    NASA Image and Video Library

    2015-02-13

    KSC-2015-1363 (02/11/2015) --- The SpaceX Falcon 9 rocket carrying NOAA’s Deep Space Climate Observatory spacecraft, or DSCOVR, lifts off from Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida at 6:03 p.m. EST. DSCOVR is a partnership between NOAA, NASA and the U.S. Air Force, and will maintain the nation's real-time solar wind monitoring capabilities. To learn more about DSCOVR, visit www.nesdis.noaa.gov/DSCOVR. Photo credit: NASA/Tony Gray and Tim Powers

  19. Deep Space Climate Observatory (DSCOVR) lifted off from Cape Canaveral

    NASA Image and Video Library

    2015-02-13

    KSC-2015-1341 (02/11/2015) --- The SpaceX Falcon 9 rocket carrying NOAA’s Deep Space Climate Observatory spacecraft, or DSCOVR, lifts off from Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida. Liftoff occurred at 6:03 p.m. EST. DSCOVR is a partnership between NOAA, NASA and the U.S. Air Force, and will maintain the nation's real-time solar wind monitoring capabilities. To learn more about DSCOVR, visit www.nesdis.noaa.gov/DSCOVR. Photo credit: NASA/Ben Smegelsky

  20. Performance evaluation of NASA/KSC CAD/CAE graphics local area network

    NASA Technical Reports Server (NTRS)

    Zobrist, George

    1988-01-01

    This study had as an objective the performance evaluation of the existing CAD/CAE graphics network at NASA/KSC. This evaluation will also aid in projecting planned expansions, such as the Space Station project on the existing CAD/CAE network. The objectives were achieved by collecting packet traffic on the various integrated sub-networks. This included items, such as total number of packets on the various subnetworks, source/destination of packets, percent utilization of network capacity, peak traffic rates, and packet size distribution. The NASA/KSC LAN was stressed to determine the useable bandwidth of the Ethernet network and an average design station workload was used to project the increased traffic on the existing network and the planned T1 link. This performance evaluation of the network will aid the NASA/KSC network managers in planning for the integration of future workload requirements into the existing network.

  1. STS-57 Endeavour, Orbiter Vehicle (OV) 105, lifts off from KSC LC Pad 39B

    NASA Image and Video Library

    1993-06-21

    STS057-S-053 (21 June 1993) --- The Space Shuttle Endeavour lifts off Launch Pad 39B as captured on film by an audio-activated camera positioned at the 270-feet level on the Rotating Service Structure (RSS) at Launch Pad 39B. STS-57 launch occurred at 9:07:22 a.m. (EDT), June 21, 1993. The mission represents the first flight of the commercially developed SpaceHab laboratory module and also will feature a retrieval of the European Retrievable Carrier (EURECA). Onboard for Endeavour's fourth flight are a crew of six NASA astronauts; Ronald J. Grabe, mission commander; Brian Duffy, pilot; G. David Low, payload commander; and Nancy J. Sherlock, Peter J. K. (Jeff) Wisoff and Janice E. Voss, all mission specialists. An earlier launch attempt was scrubbed due to unacceptable weather conditions both at the Kennedy Space Center (KSC) and the overseas contingency landing sites.

  2. NASA-KSC/Florida Dual Use Technology Partnership

    NASA Technical Reports Server (NTRS)

    Kershaw, David

    2001-01-01

    This document constitutes the Technological Research and Development Authority's (TRDA) Final Reports for the NASA-KSC/Florida Dual Use Technology Partnership grant covering the period December 1, 1999 through November 30, 2000. The NASA Grant and Cooperative Agreement Handbook requires the TRDA to provide NASA with a final report on Subject Inventions, Federal Cash Transactions, Summary Research, and Federally-Owned Property. This report contains those requirements as well as a description of the TRDA's grant performance related to activities undertaken, difficulties incurred, remedial actions, and the current financial status of the contract.

  3. Overview of Fundamental High-Lift Research for Transport Aircraft at NASA

    NASA Technical Reports Server (NTRS)

    Leavitt, L. D.; Washburn, A. E.; Wahls, R. A.

    2007-01-01

    NASA has had a long history in fundamental and applied high lift research. Current programs provide a focus on the validation of technologies and tools that will enable extremely short take off and landing coupled with efficient cruise performance, simple flaps with flow control for improved effectiveness, circulation control wing concepts, some exploration into new aircraft concepts, and partnership with Air Force Research Lab in mobility. Transport high-lift development testing will shift more toward mid and high Rn facilities at least until the question: "How much Rn is required" is answered. This viewgraph presentation provides an overview of High-Lift research at NASA.

  4. Performance Evaluation of the NASA/KSC Transmission System

    NASA Technical Reports Server (NTRS)

    Christensen, Kenneth J.

    2000-01-01

    NASA-KSC currently uses three bridged 100-Mbps FDDI segments as its backbone for data traffic. The FDDI Transmission System (FTXS) connects the KSC industrial area, KSC launch complex 39 area, and the Cape Canaveral Air Force Station. The report presents a performance modeling study of the FTXS and the proposed ATM Transmission System (ATXS). The focus of the study is on performance of MPEG video transmission on these networks. Commercial modeling tools - the CACI Predictor and Comnet tools - were used. In addition, custom software tools were developed to characterize conversation pairs in Sniffer trace (capture) files to use as input to these tools. A baseline study of both non-launch and launch day data traffic on the FTXS is presented. MPEG-1 and MPEG-2 video traffic was characterized and the shaping of it evaluated. It is shown that the characteristics of a video stream has a direct effect on its performance in a network. It is also shown that shaping of video streams is necessary to prevent overflow losses and resulting poor video quality. The developed models can be used to predict when the existing FTXS will 'run out of room' and for optimizing the parameters of ATM links used for transmission of MPEG video. Future work with these models can provide useful input and validation to set-top box projects within the Advanced Networks Development group in NASA-KSC Development Engineering.

  5. Current Status of NASA's Heavy Lift Plans

    NASA Technical Reports Server (NTRS)

    Creech, Steve

    2010-01-01

    Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of - and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA's most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA's Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA's priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch Numerous studies

  6. NASA helicopter helps fight brush fire at KSC

    NASA Technical Reports Server (NTRS)

    2000-01-01

    A NASA helicopter flies toward the source of the smoke to drop its load of water on a wildfire at KSC. Before being extinguished, the fire burned about 20 acres at a site near gate 2C on Kennedy Parkway North (route 3).

  7. NASA helicopter helps fight brush fire at KSC

    NASA Technical Reports Server (NTRS)

    2000-01-01

    A NASA helicopter flies over fire-fighting equipment and personnel in order to drop its load of water on a wildfire at KSC. Before being extinguished, the fire burned about 20 acres at a site near gate 2C on Kennedy Parkway North (route 3).

  8. 14 CFR 25.697 - Lift and drag devices, controls.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... conditions of airspeed, engine power, and airplane attitude. (d) The lift device control must be designed to... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Lift and drag devices, controls. 25.697... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25...

  9. NASA helicopter helps fight brush fire at KSC

    NASA Technical Reports Server (NTRS)

    2000-01-01

    A NASA helicopter dips its fire-fighting bucket into the river to pick up and deliver a cargo of water to a wildfire at KSC. Before being extinguished, the fire burned about 20 acres at a site near gate 2C on Kennedy Parkway North (route 3).

  10. Lifting of NASA OCO-2 Delta II Launch Vehicle

    NASA Image and Video Library

    2014-04-15

    The Delta II second stage for NASA Orbiting Carbon Observatory-2 mission, or OCO-2, is lifted to the top of the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California.

  11. STS-37 Gamma Ray Observatory (GRO) at KSC Payload Hazardous Servicing Fac

    NASA Technical Reports Server (NTRS)

    1990-01-01

    At the Kennedy Space Center (KSC) Payload Hazardous Servicing Facility, the overhead crane lifts the Gamma Ray Observatory (GRO) from its storage container. GRO, one of four NASA Great Observatories, arrived at KSC on 02-06-90 from the California plant of builder TRW. Weighing a massive 34,700 pounds, GRO will be the heaviest payload without an upper stage ever carried aboard the Space Shuttle. It is scheduled for deployment from Atlantis, Orbiter Vehicle (OV) 104, during STS-37.

  12. RF Properties of Epitaxial Lift-Off HEMT Devices

    NASA Technical Reports Server (NTRS)

    Young, Paul G.; Alterovitz, Samuel A.; Mena, Rafael A.; Smith, Edwyn D.

    1993-01-01

    Epitaxial layers containing GaAs HEMT and P-HEMT structures have been lifted-off the GaAs substrate and attached to other host substrates using an AlAs parting layer. The devices were on-wafer RF probed before and after the lift-off step showing no degradation in the measured S-parameters. The maximum stable gain indicates a low frequency enhancement of the gain of 1-2 dB with some devices showing an enhancement of F(sub max)F(sub T) consistently shows an increase of 12-20% for all lifted-off HEMT structures. Comparison of the Hall measurements and small signal models show that the gain is improved and this is most probably associated with an enhanced carrier concentration.

  13. Performance evaluation of the NASA/KSC CAD/CAE and office automation LAN's

    NASA Technical Reports Server (NTRS)

    Zobrist, George W.

    1994-01-01

    This study's objective is the performance evaluation of the existing CAD/CAE (Computer Aided Design/Computer Aided Engineering) network at NASA/KSC. This evaluation also includes a similar study of the Office Automation network, since it is being planned to integrate this network into the CAD/CAE network. The Microsoft mail facility which is presently on the CAD/CAE network was monitored to determine its present usage. This performance evaluation of the various networks will aid the NASA/KSC network managers in planning for the integration of future workload requirements into the CAD/CAE network and determining the effectiveness of the planned FDDI (Fiber Distributed Data Interface) migration.

  14. Heavy Lift Vehicle (HLV) Avionics Flight Computing Architecture Study

    NASA Technical Reports Server (NTRS)

    Hodson, Robert F.; Chen, Yuan; Morgan, Dwayne R.; Butler, A. Marc; Sdhuh, Joseph M.; Petelle, Jennifer K.; Gwaltney, David A.; Coe, Lisa D.; Koelbl, Terry G.; Nguyen, Hai D.

    2011-01-01

    A NASA multi-Center study team was assembled from LaRC, MSFC, KSC, JSC and WFF to examine potential flight computing architectures for a Heavy Lift Vehicle (HLV) to better understand avionics drivers. The study examined Design Reference Missions (DRMs) and vehicle requirements that could impact the vehicles avionics. The study considered multiple self-checking and voting architectural variants and examined reliability, fault-tolerance, mass, power, and redundancy management impacts. Furthermore, a goal of the study was to develop the skills and tools needed to rapidly assess additional architectures should requirements or assumptions change.

  15. KSC-98pc510

    NASA Image and Video Library

    1998-04-17

    STS-90 Mission Specialist Kathryn (Kay) Hire is assisted by NASA and USA closeout crew members immediately preceding launch for the nearly 17-day Neurolab mission. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system. Hire and six fellow crew members will shortly enter the orbiter at KSC's Launch Pad 39B, where the Space Shuttle Columbia will lift off during a launch window that opens at 2:19 p.m. EDT, April 17

  16. KSC-98pc514

    NASA Image and Video Library

    1998-04-17

    STS-90 Payload Specialist Jay Buckey, M.D., is assisted by NASA and USA closeout crew members immediately preceding launch for the nearly 17-day Neurolab mission. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system. Buckey and six fellow crew members will shortly enter the orbiter at KSC's Launch Pad 39B, where the Space Shuttle Columbia will lift off during a launch window that opens at 2:19 p.m. EDT, April 17

  17. How NASA KSC Controls Interfaces with the use of Motion Skeletons and Product Structure

    NASA Technical Reports Server (NTRS)

    Jones, Corey

    2013-01-01

    This presentation will show how NASA KSC controls interfaces for Modular Product Architecture (MPA) using Locator Skeletons, Interface Skeletons, and Product Structure, to be combined together within a Motion Skeleton. The user will learn how to utilize skeleton models to communicate interface data, as successfully done at NASA KSC in their use of Motion Skeletons to control interfaces for multi-launch systems. There will be discussion of the methodology used to control design requirements through WTParts, and how to utilize product structure for non-CAD documents.

  18. KSC-98pc511

    NASA Image and Video Library

    1998-04-17

    KENNEDY SPACE CENTER, FLA. -- STS-90 Commander Richard Searfoss is assisted by NASA and USA closeout crew members immediately preceding launch for the nearly 17-day Neurolab mission. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system. Searfoss and his six fellow crew members will shortly enter the orbiter at KSC's Launch Pad 39B, where the Space Shuttle Columbia will lift off during a launch window that opens at 2:19 p.m. EDT, April 17

  19. KSC-98pc513

    NASA Image and Video Library

    1998-04-17

    KENNEDY SPACE CENTER, FLA. -- STS-90 Pilot Scott Altman is assisted by NASA and United Space Alliance closeout crew members immediately preceding launch for the nearly 17-day Neurolab mission. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system. Altman and six fellow crew members will shortly enter the orbiter at KSC's Launch Pad 39B, where the Space Shuttle Columbia will lift off during a launch window that opens at 2:19 p.m. EDT, April 17

  20. KSC-04pd1645

    NASA Image and Video Library

    2004-08-03

    KENNEDY SPACE CENTER, FLA. - In the Space Shuttle Main Engine (SSME) Processing Facility, Boeing-Rocketdyne crane operator Joe Ferrante (second from right) lifts SSME 2058, the first SSME fully assembled at KSC, with the assistance of other technicians on his team. The engine is being lifted from its vertical work stand into a horizontal position in preparation for shipment to NASA’s Stennis Space Center in Mississippi to undergo a hot fire acceptance test. It is the first of five engines to be fully assembled on site to reach the desired number of 15 engines ready for launch at any given time in the Space Shuttle program. A Space Shuttle has three reusable main engines. Each is 14 feet long, weighs about 7,800 pounds, is seven-and-a-half feet in diameter at the end of its nozzle, and generates almost 400,000 pounds of thrust. Historically, SSMEs were assembled in Canoga Park, Calif., with post-flight inspections performed at KSC. Both functions were consolidated in February 2002. The Rocketdyne Propulsion and Power division of The Boeing Co. manufactures the engines for NASA.

  1. Experimental and simulated control of lift using trailing edge devices

    NASA Astrophysics Data System (ADS)

    Cooperman, A.; Blaylock, M.; van Dam, C. P.

    2014-12-01

    Two active aerodynamic load control (AALC) devices coupled with a control algorithm are shown to decrease the change in lift force experienced by an airfoil during a change in freestream velocity. Microtabs are small (1% chord) surfaces deployed perpendicular to an airfoil, while microjets are pneumatic jets with flow perpendicular to the surface of the airfoil near the trailing edge. Both devices are capable of producing a rapid change in an airfoil's lift coefficient. A control algorithm for microtabs has been tested in a wind tunnel using a modified S819 airfoil, and a microjet control algorithm has been simulated for a NACA 0012 airfoil using OVERFLOW. In both cases, the AALC devices have shown the ability to mitigate the changes in lift during a gust.

  2. KSC-98pc509

    NASA Image and Video Library

    1998-04-17

    KENNEDY SPACE CENTER, FLA. -- STS-90 Payload Specialist James Pawelczyk, Ph.D., is assisted by NASA and United Space Alliance closeout crew members immediately preceding launch for the nearly 17-day Neurolab mission. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system. Pawelczyk and six fellow crew members will shortly enter the orbiter at KSC's Launch Pad 39B, where the Space Shuttle Columbia will lift off during a launch window that opens at 2:19 p.m. EDT, April 17

  3. KSC-98pc512

    NASA Image and Video Library

    1998-04-17

    KENNEDY SPACE CENTER, FLA. -- STS-90 Mission Specialist Richard Linnehan, D.V.M., is assisted by NASA and United Space Alliance closeout crew members immediately preceding launch for the nearly 17-day Neurolab mission. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system. Linnehan and six fellow crew members will shortly enter the orbiter at KSC's Launch Pad 39B, where the Space Shuttle Columbia will lift off during a launch window that opens at 2:19 p.m. EDT, April 17

  4. STS-45 Atlantis, OV-104, lifts off from KSC Launch Complex (LC) Pad

    NASA Image and Video Library

    1992-03-24

    STS-45 Atlantis, Orbiter Vehicle (OV) 104, lifts off from a Kennedy Space Center (KSC) Launch Complex (LC) Pad at 8:13:40:048 am (Eastern Standard Time (EST)). Exhaust billows out the solid rocket boosters (SRBs) as OV-104 atop its external tank (ET) soars above the mobile launcher platform and is nearly clear of the fixed service structure (FSS) tower. The diamond shock effect produced by the space shuttle main engines (SSMEs) is visible. The glow of the SRB/SSME firings is reflected in a nearby waterway. An exhaust cloud covers the launch pad area.

  5. A walker used as a lifting device.

    PubMed

    Glimskär, Bo; Hjalmarson, Jenny; Lundberg, Stefan; Larsson, Tore

    2014-05-01

    To develop assistive technology that would help an older person to arise from a kneeling position to a standing one. Developing a prototype, based on an inclusive design and then testing the prototype to verify the approach. The prototype was subsequently tested by a panel of 20 elderly users. These tests were observed and filmed. Participants' experiences of being lifted with the elevation seat were registered with the VIDAR ergonomic assessment system. None of the 20 participants used a walker at that time. In response to a question of whether, assuming they might have to use a walker in the future, they thought that a walker with an elevating seat would be helpful, 18 said that it would. Two of the participants did not believe that they would ever have to use a walker. A simple assistive technology such as a walker equipped with an elevating seat would in many of these cases simplify matters and reduce the distress of people who fall often. In addition, such a device can allow people who fall often to live in their homes longer. For caregivers dealing frequently with people who fall, this assistive device can contribute to decreasing occupational injuries. Development of a lifting device that can help people raise themselves up entirely on their own, or with minimal assistance, would be a revolutionary step for the individual. Lifting devices in use today requires much more extensive assistance from home helpers or others and due to the risk of injuries it is a great value for the helpers that easy to use devices develops. A walker equipped with an elevating seat could even provide a potential for people to stay in their homes longer.

  6. KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and NASA Space Shuttle Program Manager William Parsons each don an Emergency Life Support Apparatus (ELSA) during training on the proper use of the escape devices. NASA and United Space Alliance (USA) Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and NASA Space Shuttle Program Manager William Parsons each don an Emergency Life Support Apparatus (ELSA) during training on the proper use of the escape devices. NASA and United Space Alliance (USA) Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  7. NASA KSC Intern Final Paper

    NASA Technical Reports Server (NTRS)

    Colton, Andrew

    2012-01-01

    I am finishing up my internship with the Application & Simulation group at NASA Kennedy Space Center (KSC). During this internship I was working with the Plant Habitat development team. The Plant Habitat provides a large enclosed, environmentally controlled chamber designed to support commercial and fundamental plant research onboard the International Space Station (ISS). The work that I did was for the prototype of the Graphical User Interface (GUI) display. This display is used by the scientists to monitor the system health, start new experiment configurations, and get real-time information about the experiment as its being run. This display is developed using the Qt Framework Integrated Development Environment (IDE) and the programming language C++.

  8. 1997 NASA High-Speed Research Program Aerodynamic Performance Workshop. Volume 2; High Lift

    NASA Technical Reports Server (NTRS)

    Baize, Daniel G. (Editor)

    1999-01-01

    The High-Speed Research Program and NASA Langley Research Center sponsored the NASA High-Speed Research Program Aerodynamic Performance Workshop on February 25-28, 1997. The workshop was designed to bring together NASA and industry High-Speed Civil Transport (HSCT) Aerodynamic Performance technology development participants in areas of Configuration Aerodynamics (transonic and supersonic cruise drag, prediction and minimization), High-Lift, Flight Controls, Supersonic Laminar Flow Control, and Sonic Boom Prediction. The workshop objectives were to (1) report the progress and status of HSCT aerodynamic performance technology development; (2) disseminate this technology within the appropriate technical communities; and (3) promote synergy among the scientist and engineers working HSCT aerodynamics. In particular, single- and multi-point optimized HSCT configurations, HSCT high-lift system performance predictions, and HSCT Motion Simulator results were presented along with executives summaries for all the Aerodynamic Performance technology areas.

  9. STS-56 Discovery, OV-103, lifts off from KSC LC Pad 39B into darkness

    NASA Technical Reports Server (NTRS)

    1993-01-01

    STS-56 Discovery, Orbiter Vehicle (OV) 103, lifts off from Kennedy Space Center (KSC) Launch Complex (LC) Pad 39B into the early morning darkness at 1:29 am (Eastern Daylight Time (EDT)). OV-103, atop its external tank (ET) and flanked by solid rocket boosters (SRBs), rises above the mobile launcher platform. Exhaust plumes trail from the SRBs. The glow of the SRB / space shuttle main engine (SSME) firings illuminate the fixed service structure (FSS) tower. Trees are silhouetted against the launch fireworks in the foreground.

  10. Monitoring system of hydraulic lifting device based on the fiber optic sensors

    NASA Astrophysics Data System (ADS)

    Fajkus, Marcel; Nedoma, Jan; Novak, Martin; Martinek, Radek; Vanus, Jan; Mec, Pavel; Vasinek, Vladimir

    2017-10-01

    This article deals with the description of the monitoring system of hydraulic lifting device based on the fiber-optic sensors. For minimize the financial costs of the proposed monitoring system, the power evaluation of measured signal has been chosen. The solution is based on an evaluation of the signal obtained using the single point optic fiber sensors with overlapping reflective spectra. For encapsulation of the sensors was used polydimethylsiloxane (PDMS) polymer. To obtain a information of loading is uses the action of deformation of the lifting device on the pair single point optic fiber sensors mounted on the lifting device of the tested car. According to the proposed algorithm is determined information of pressure with an accuracy of +/- 5 %. Verification of the proposed system was realized on the various types of the tested car with different loading. The original contribution of the paper is to verify the new low-cost system for monitoring the hydraulic lifting device based on the fiber-optic sensors.

  11. Flow Control Research at NASA Langley in Support of High-Lift Augmentation

    NASA Technical Reports Server (NTRS)

    Sellers, William L., III; Jones, Gregory S.; Moore, Mark D.

    2002-01-01

    The paper describes the efforts at NASA Langley to apply active and passive flow control techniques for improved high-lift systems, and advanced vehicle concepts utilizing powered high-lift techniques. The development of simplified high-lift systems utilizing active flow control is shown to provide significant weight and drag reduction benefits based on system studies. Active flow control that focuses on separation, and the development of advanced circulation control wings (CCW) utilizing unsteady excitation techniques will be discussed. The advanced CCW airfoils can provide multifunctional controls throughout the flight envelope. Computational and experimental data are shown to illustrate the benefits and issues with implementation of the technology.

  12. KSC-03PD-3249

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and NASA Space Shuttle Program Manager William Parsons each don an Emergency Life Support Apparatus (ELSA) during training on the proper use of the escape devices. NASA and United Space Alliance (USA) Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  13. The influence of individual and organisational factors on nurses' behaviour to use lifting devices in healthcare.

    PubMed

    Koppelaar, E; Knibbe, J J; Miedema, H S; Burdorf, A

    2013-07-01

    This study evaluates the influence of individual and organisational factors on nurses' behaviour to use lifting devices in healthcare. Interviews among nurses were conducted to collect individual characteristics and to establish their behaviour regarding lifting devices use. Organisational factors were collected by questionnaires and walk-through-surveys, comprising technical facilities, organisation of care, and management-efforts. Generalised-Estimating-Equations for repeated measurements were used to estimate determinants of nurses' behaviour. Important determinants of nurses' behaviour to use lifting devices were knowledge of workplace procedures (OR = 5.85), strict guidance on required lifting devices use (OR = 2.91), and sufficient lifting devices (OR = 1.92). Management-support and supportive-management-climate were associated with these determinants. Since nurses' behaviour to use lifting devices is influenced by factors at different levels, studies in ergonomics should consider how multi-level factors impact each other. An integral approach, addressing individual and organisational levels, is necessary to facilitate appropriate implementation of ergonomic interventions, like lifting devices. Copyright © 2012 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  14. A NASA helicopter arrives at KSC for painting

    NASA Technical Reports Server (NTRS)

    2000-01-01

    A NASA helicopter is secured for transfer to Ransom Road at KSC. It is one of four UH-1H helicopters that will have its blades painted, changing the black to a pattern of white and yellow stripes. The pattern provides better visibility in smoke and fire conditions. When the rotors are turning, the stripes create a yellow and white circle that is more easily seen by a second helicopter from above. The helicopters, primarily used for security and medical evacuation for NASA, will be used to deliver water via buckets during brush fires. The change was made to comply with U.S. Fish and Wildlife and Department of Forestry regulations for helicopter-assisted fire control.

  15. KSC-07pd1764

    NASA Image and Video Library

    2007-07-03

    KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, workers supervise the movement of the sling above the orbiter Atlantis. The sling will be attached and lift the orbiter away from the shuttle carrier aircraft (SCA) underneath. The SCA carried the orbiter piggyback from California. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117. It returned to Kennedy atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Photo credit: NASA/Kim Shiflett

  16. KSC-97PC1026

    NASA Image and Video Library

    1997-07-08

    Technicians from the Jet Propulsion Laboratory (JPL) of the California Institute of Technology lift the remote sensing pallet in the Payload Hazardous Servicing Facility at KSC in July prior to installation on the Cassini spacecraft. A four- year, close-up study of the Saturnian system, the Cassini mission is scheduled for launch from Cape Canaveral Air Station in October 1997. It will take seven years for the spacecraft to reach Saturn. Scientific instruments carried aboard the spacecraft will study Saturn’s atmosphere, magnetic field, rings, and several moons. JPL is managing the Cassini project for NASA

  17. STS-38 Atlantis, OV-104, lifts off from KSC LC Pad during night launch

    NASA Technical Reports Server (NTRS)

    1990-01-01

    STS-38 Atlantis, Orbiter Vehicle (OV) 104, lifts off from Kennedy Space Center (KSC) Launch Complex (LC) Pad at 6:48:15:0639 pm (Eastern Standard Time (EST)) for Department of Defense (DOD)-devoted mission. OV-104, atop the external tank (ET) and flanked by solid rocket boosters (SRBs), is almost clear of the launch tower which is lit up by the SRB and space shuttle main engine (SSME) firings. Spotlight equipment is silhouetted against the SRB/SSME glow in the foreground. The retracted rotating service structure (RSS) is highlighted against the evening darkness by the launch fireworks.

  18. A NASA helicopter arrives at KSC for painting

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The pilot of the NASA helicopter secures the rotary blade before the helicopter's transfer to Ransom Road at KSC. It is one of four UH-1H helicopters that will have its blades painted, changing the black to a pattern of white and yellow stripes. The pattern provides better visibility in smoke and fire conditions. When the rotors are turning, the stripes create a yellow and white circle that is more easily seen by a second helicopter from above. The helicopters, primarily used for security and medical evacuation for NASA, will be used to deliver water via buckets during brush fires. The change was made to comply with U.S. Fish and Wildlife and Department of Forestry regulations for helicopter-assisted fire control.

  19. NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Johnson, Roger (Editor); Buckingham, Gregg (Editor)

    1996-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1996 NASA/ASEE Summer Faculty Fellowship Program at the Kennedy Space Center (KSC). This was the twelfth year that a NASA/ASEE program has been conducted at KSC. The 1996 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Office of Educational Affairs, NASA Headquarters, Washington, DC and KSC. The KSC Program was one of nine such Aeronautics and Space Research Program funded by NASA in 1996. The NASA/ASEE Program is intended to be a two-year program to allow in-depth research by the University faculty member. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many problems of current interest to NASA/KSC.

  20. KSC-2013-3531

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, NASA chief technologist Mason Peck addresses the audience in the KSC Training Auditorium at KSC Talks 2013 on the second day of the KSC Innovation Expo. KSC Talks featured a series of speakers that collectively took the audience on a journey through innovation, from inspiration to application and beyond. The variety of topics presented encouraged the audience to become “Ready for Anything,” to learn how to “Train and un-train Your Brain for Innovation,” and to discover how to “Change the Possible,” among others. Photo credit: NASA/Cory Huston

  1. KSC-2013-3532

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, NASA chief technologist Mason Peck engages the audience in the KSC Training Auditorium at KSC Talks 2013 on the second day of the KSC Innovation Expo. KSC Talks featured a series of speakers that collectively took the audience on a journey through innovation, from inspiration to application and beyond. The variety of topics presented encouraged the audience to become “Ready for Anything,” to learn how to “Train and un-train Your Brain for Innovation,” and to discover how to “Change the Possible,” among others. Photo credit: NASA/Cory Huston

  2. Dignitaries Await Apollo 11 Lift Off

    NASA Technical Reports Server (NTRS)

    1969-01-01

    From the right, NASA administrator, Dr. Thomas O. Paine talks with U.S. Vice President Spiro T. Agnew while awaiting the launch of Saturn V (AS-506) that carried the Apollo 11 spacecraft to the Moon for man's historic first landing on the lunar surface. At center is astronaut William Anders, a member of the first crew to orbit the moon during the Apollo 8 mission. At left is Lee B. James, director of Program Management at the NASA Marshall Space Flight Center (MSFC) where the Saturn V was developed. The craft lifted off from launch pad 39 at Kennedy Space Flight Center (KSC) on July 16, 1969. The moon bound crew included astronauts Neil A. Armstrong, commander; Michael Collins, Command Module (CM) pilot; and Edwin E. Aldrin Jr., Lunar Module (M) pilot. The mission finalized with splashdown in the Pacific Ocean on July 24, 1969. With the success of Apollo 11, the national objective to land men on the Moon and return them safely to Earth had been accomplished.

  3. NASA's Space Launch System: A Heavy-Lift Platform for Entirely New Missions

    NASA Technical Reports Server (NTRS)

    Creech, Stephen A.

    2012-01-01

    The National Aeronautics and Space Administration s (NASA's) Space Launch System (SLS) will contribute a new capability for human space flight and scientific missions beyond low-Earth orbit. The SLS Program, managed at NASA s Marshall Space Fight Center, will develop the heavy-lift vehicle that will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions. Orion will carry crews to space, provide emergency abort capability, sustain the crew during space travel, and provide safe reentry from deep-space return velocities. Supporting Orion s first autonomous flight to lunar orbit and back in 2017 and its first crewed flight in 2021, the SLS ultimately offers a flexible platform for both human and scientific exploration. The SLS plan leverages legacy infrastructure and hardware in NASA s inventory, as well as continues with advanced propulsion technologies now in development, to deliver an initial 70 metric ton (t) lift capability in 2017, evolving to a 130-t capability after 2021, using a block upgrade approach. This paper will give an overview of the SLS design and management approach against a backdrop of the missions it will support. It will detail the plan to deliver the initial SLS capability to the launch pad in the near term, as well as summarize the innovative approaches the SLS team is applying to deliver a safe, affordable, and sustainable long-range capability for entirely new missions opening a new realm of knowledge and a world of possibilities for multiple partners. Design reference missions that the SLS is being planned to support include asteroids, Lagrange Points, and Mars, among others. The Agency is developing its mission manifest in parallel with the development of a heavy-lift flagship that will dramatically increase total lift and volume capacity beyond current launch vehicle options, reduce trip times, and provide a robust platform for conducting new missions destined to rewrite textbooks with the

  4. High-Lift Engine Aeroacoustics Technology (HEAT) Test Program Overview

    NASA Technical Reports Server (NTRS)

    Zuniga, Fanny A.; Smith, Brian E.

    1999-01-01

    The NASA High-Speed Research program developed the High-Lift Engine Aeroacoustics Technology (HEAT) program to demonstrate satisfactory interaction between the jet noise suppressor and high-lift system of a High-Speed Civil Transport (HSCT) configuration at takeoff, climb, approach and landing conditions. One scheme for reducing jet exhaust noise generated by an HSCT is the use of a mixer-ejector system which would entrain large quantities of ambient air into the nozzle exhaust flow through secondary inlets in order to cool and slow the jet exhaust before it exits the nozzle. The effectiveness of such a noise suppression device must be evaluated in the presence of an HSCT wing high-lift system before definitive assessments can be made concerning its acoustic performance. In addition, these noise suppressors must provide the required acoustic attenuation while not degrading the thrust efficiency of the propulsion system or the aerodynamic performance of the high-lift devices on the wing. Therefore, the main objective of the HEAT program is to demonstrate these technologies and understand their interactions on a large-scale HSCT model. The HEAT program is a collaborative effort between NASA-Ames, Boeing Commercial Airplane Group, Douglas Aircraft Corp., Lockheed-Georgia, General Electric and NASA - Lewis. The suppressor nozzles used in the tests were Generation 1 2-D mixer-ejector nozzles made by General Electric. The model used was a 13.5%-scale semi-span model of a Boeing Reference H configuration.

  5. KSC History Project

    NASA Technical Reports Server (NTRS)

    Moore, Patrick K.

    2003-01-01

    The 2003 NASA/ASEE KSC History Project focused on a series of six history initiatives designed to acquire, preserve, and interpret the history of Kennedy Space Center. These six projects included the completion of Voices From the Cape, historical work co-authored with NASA historian Roger Launius, the completion of a series of oral histories with key KSC personnel, expansion of monograph on Public Affairs into two comprehensive pieces on KSC press operations and KSC visitor operations, the expansion of KSC Historical Concept Maps (Cmap) for history knowledge preservation, the expansion of the KSC oral history program through the administration of an oral history workshop for KSC-based practitioners, and the continued collaborative relationships between Kennedy Space Center, the University of West Florida, the University of Central Florida and other institutions including the University of Louisiana at Lafayette.

  6. KSC/IT Knowledge Sharing With JAXA/IT

    NASA Technical Reports Server (NTRS)

    Turner, Stacie

    2010-01-01

    The mission of NASA IT [organizations throughout the Agency] is to increase the productivity of scientists, engineers, and mission support personnel by responsively and efficiently delivering reliable, innovative and secure IT services. (http://insidenasa.nasa.gov/ocio/about/index.html, July 2010) IT at NASA/KSC serves to enable KSC's mission (Human Space Flight) in a customer-focused manner by offering a breadth of IT services to support the current and advanced information technology and communications needs of KSC institutional and NASA/KSC program customers.

  7. KSC-03PD-2266

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. Incoming KSC Director James W. Kennedy (left) and departing KSC Director Roy D. Bridges Jr. (center) view the new sign on the NASA Causeway naming the bridge for Bridges who is leaving KSC to become the director of NASA's Langley Research Center, Hampton, Va. At right is the 45th Space Wing Commander Brig. Gen. J. Gregory Pavlovich. The bridge spans the Banana River on the NASA Causeway and connects Kennedy Space Center and Cape Canaveral Air Force Station.

  8. KSC-98pc508

    NASA Image and Video Library

    1998-04-17

    KENNEDY SPACE CENTER, FLA. -- STS-90 Mission Specialist Dafydd (Dave) Williams, M.D., with the Canadian Space Agency is assisted by NASA and United Space Alliance closeout crew members immediately preceding launch for the nearly 17-day Neurolab mission. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system. Seen behind Williams also in an orange launch and re-entry suit is Mission Specialist Richard Linnehan, D.V.M. Williams and six fellow crew members will shortly enter the orbiter at KSC's Launch Pad 39B, where the Space Shuttle Columbia will lift off during a launch window that opens at 2:19 p.m. EDT, April 17

  9. Transition in the Human Exploration of Space at NASA

    NASA Technical Reports Server (NTRS)

    Koch, Carla A.; Cabana, Robert

    2011-01-01

    NASA is taking the next step in human exploration, beyond low Earth orbit. We have been going to low Earth orbit for the past 50 years and are using this experience to work with commercial companies to perform this function. This will free NASA resources to develop the systems necessary to travel to a Near Earth Asteroid, the Moon, Lagrange Points, and eventually Mars. At KSC, we are positioning ourselves to become a multi-user launch complex and everything we are working on is bringing us closer to achieving this goal. A vibrant multi-use spaceport is to the 21st Century what the airport was to the 20th Century - an invaluable transportation hub that supports government needs while promoting economic development and commercial markets beyond Earth's atmosphere. This past year saw the end of Shuttle, but the announcements of NASA's crew module, Orion, and heavy-lift rocket, the SLS, as well as the establishment of the Commercial Crew Program. We have a busy, but very bright future ahead of us and KSC is looking forward to playing an integral part in the next era of human space exploration. The future is SLS, 21st Century Ground Systems Program, and the Commercial Crew Program; and the future is here.

  10. KSC-2013-3530

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Director Robert Cabana opens KSC Talks 2013 in the KSC Training Auditorium on the second day of the KSC Innovation Expo. KSC Talks featured a series of speakers that collectively took the audience on a journey through innovation, from inspiration to application and beyond. The variety of topics presented encouraged the audience to become “Ready for Anything,” to learn how to “Train and un-train Your Brain for Innovation,” and to discover how to “Change the Possible,” among others. Photo credit: NASA/Cory Huston

  11. NASA's Space Launch System: A Heavy-Lift Platform for Entirely New Missions

    NASA Technical Reports Server (NTRS)

    Creech, Stephen D.

    2012-01-01

    The National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) will contribute a new capability for human space flight and scientific missions beyond low-Earth orbit (LEO). The SLS Program, managed at NASA s Marshall Space Flight Center, will develop the heavy-lift vehicle that will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions for exploration and discovery. Orion will carry crews to space, provide emergency abort capability, sustain the crew during space travel, and provide safe reentry from deep-space return velocities. Supporting Orion s first autonomous flight to lunar orbit and back in 2017 and its first crewed flight in 2021, the SLS ultimately offers a flexible platform for both human and scientific exploration. The SLS plan leverages legacy infrastructure and hardware in NASA s inventory, as well as continues with advanced technologies now in development, to deliver an initial 70 metric ton (t) lift capability in 2017, evolving to a 130-t capability, using a block upgrade approach. This paper will give an overview of the SLS design and management approach against a backdrop of the missions it will support. It will detail the plan to deliver the initial SLS capability to the launch pad in the near term, as well as summarize the innovative approaches the SLS team is applying to deliver a safe, affordable, and sustainable long-range capability for entirely new missions-opening a new realm of knowledge and a world of possibilities for multiple partners. Design reference missions that the SLS is being planned to support include Mars, Jupiter, Lagrange Points, and near-Earth asteroids (NEAs), among others. The Agency is developing its mission manifest in parallel with the development of a heavy-lift flagship that will dramatically increase total lift and volume capacity beyond current launch vehicle options, reduce trip times, and provide a robust platform for conducting new missions

  12. KSC-02pd1661

    NASA Image and Video Library

    2002-10-28

    KENNEDY SPACE CENTER, FLA. -- Workers in the Multi-Purpose Processing Facility at KSC lift the Solar Radiation and Climate Experiment (SORCE) spacecraft to move it to a workstand. SORCE arrived at Kennedy Space Center Oct. 26 to begin final processing. SORCE is equipped with four instruments that will measure variations in solar radiation much more accurately than anything now in use and observe some of the spectral properties of solar radiation for the first time. With data from NASA's SORCE mission, researchers should be able to follow how the Sun affects our climate now and in the future. The SORCE project is managed by NASA's Goddard Space Flight Center. The instruments on the SORCE spacecraft are built by the Laboratory for Atmospheric and Space Physics (LASP). Launch of SORCE aboard a Pegasus XL rocket is scheduled for mid-December 2002. Launch site is Cape Canaveral Air Force Station, Fla.

  13. STS-57 Endeavour, OV-105, framed by Florida vegetation, lifts off from KSC LC

    NASA Image and Video Library

    1993-06-21

    STS057-S-055 (21 June 1993) --- Framed by a variety of flora types, the Space Shuttle Endeavour lifts off Launch Pad 39B to begin the STS-57 mission. Launch occurred at 9:07:22 a.m. (EDT), June 21, 1993. The mission represents the first flight of the commercially developed SPACEHAB laboratory module and also will feature a retrieval of the European Retrievable Carrier (EURECA). Onboard for Endeavour's fourth flight are a crew of six - Ronald J. Grabe, mission commander; Brian Duffy, pilot; G. David Low, payload commander; and Nancy J. Sherlock, Peter J.K. (Jeff) Wisoff and Janice E. Voss, all mission specialists. An earlier launch attempt was scrubbed due to unacceptable weather conditions both at KSC and the overseas contingency landing sites.

  14. 2002 Research Reports: NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim (Editor); Black, Cassandra (Editor)

    2002-01-01

    This document is a collection of technical reports on research conducted by the participants in the 2002 NASA/ASEE Faculty Fellowship Program at the John F. Kennedy Space Center (KSC). This was the 18th year that a NASA/ASEE program has been conducted at KSC. The 2002 program was administered by the University of Central Florida (UCF) in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) and the Education Division, NASA Headquarters, Washington, D.C. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA Headquarters in 2002. The KSC Faculty Fellows spent ten weeks working with NASA scientists and engineers on research of mutual interest to the university faculty member and the NASA colleague. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many research areas of current interest to NASA/KSC. The NASA/ASEE program is intended to be a two-year program to allow in-depth research by the university faculty member.

  15. KSC-03pd1102

    NASA Image and Video Library

    2003-04-10

    KENNEDY SPACE CENTER, FLA. -- (From left) Dean Schaaf, Barksdale site manager and NASA KSC Shuttle Process Integration Ground Operations manager, and Elliot Clement, an United Space Alliance engineer at Kennedy Space Center, inspect bagged pieces of Columbia at the Barksdale Hangar site. KSC workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  16. A Versatile Lifting Device for Lunar Surface Payload Handling, Inspection and Regolith Transport Operations

    NASA Technical Reports Server (NTRS)

    Doggett, William R.; Dorsey, John T.; Collins, Timothy J.; King, Bruce D.; Mikulas, Martin M., Jr.

    2008-01-01

    Devices for lifting and transporting payloads and material are critical for efficient Earth-based construction operations. Devices with similar functionality will be needed to support lunar-outpost construction, servicing, inspection, regolith excavation, grading and payload placement. Past studies have proposed that only a few carefully selected devices are required for a lunar outpost. One particular set of operations involves lifting and manipulating payloads in the 100 kg to 3,000 kg range, which are too large or massive to be handled by unassisted astronauts. This paper will review historical devices used for payload handling in space and on earth to derive a set of desirable features for a device that can be used on planetary surfaces. Next, an innovative concept for a lifting device is introduced, which includes many of the desirable features. The versatility of the device is discussed, including its application to lander unloading, servicing, inspection, regolith excavation and site preparation. Approximate rules, which can be used to size the device for specific payload mass and reach requirements, are provided. Finally, details of a test-bed implementation of the innovative concept, which will be used to validate the structural design and develop operational procedures, is provided.

  17. KSC-03PD-2267

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. From left, incoming KSC Director James W. Kennedy looks on as departing KSC Director Roy D. Bridges Jr. shakes hands with the 45th Space Wing Commander Brig. Gen. J. Gregory Pavlovich. The occasion is the unveiling of the new sign on the NASA Causeway naming the bridge for Bridges who is leaving KSC to become the director of NASA's Langley Research Center, Hampton, Va. The bridge spans the Banana River on the NASA Causeway and connects Kennedy Space Center and Cape Canaveral Air Force Station.

  18. 2000 Research Reports: NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Hosler, E. Ramon (Editor); Buckingham, Gregg (Editor)

    2001-01-01

    This document is a collection of technical reports on research conducted by the participants in the 2000 NASA/ASEE Summer Faculty Fellowship Program at the Kennedy Space Center (KSC). This was the 16th year that a NASA/ASEE program has been conducted at KSC. The 2000 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Education Division, NASA Headquarters, Washington, D.C., and KSC. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA in 2000. The NASA/ASEE Program is intended to be a two-year program to allow in-depth research by the university faculty member. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many problems of current interest to NASA/KSC.

  19. 1997 Research Reports: NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Hosler, E. Ramon (Editor); Buckingham, Gregg (Editor)

    1997-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1997 NASA/ASEE Summer Faculty Fellowship Program at the Kennedy Space Center (KSC). This was the 13th year that a NASA/ASEE program has been conducted at KSC. The 1997 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Education Division, NASA Headquarters, Washington, D.C., and KSC. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA in 1997. The NASA/ASEE Program is intended to be a two-year program to allow in-depth research by the university faculty member. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many problems of current interest to NASA/KSC.

  20. 1998 Research Reports: NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Hosler, E. Ramon (Editor); Buckingham, Gregg (Editor)

    1999-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1998 NASA/ASEE Summer Faculty Fellowship Program at the Kennedy Space Center (KSC). This was the 14th year that a NASA/ASEE program has been conducted at KSC. The 1998 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Education Division, NASA Headquarters, Washington, D.C., and KSC. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA in 1998. The NASA/ASEE Program is intended to be a two-year program to allow in-depth research by the university faculty member. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many problems of current interest to NASA/KSC.

  1. NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Anderson, Loren A (Editor); Valdes, Carol (Editor)

    1992-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1992 NASA/ASEE Summer Faculty Fellowship Program at Kennedy Space Center (KSC). This was the eighth year that a NASA/ASEE program has been conducted at KSC. The 1992 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Office of Educational Affairs, NASA Headquarters, Washington, D.C. The KSC program was one of nine such Aeronautics and Space Research Programs funded by NASA Headquarters in 1992. The basic common objectives are to further the professional knowledge, to stimulate an exchange of ideas, to enrich and refresh the research and teaching activities, and to contribute to the research objectives of the NASA centers.

  2. 1999 Research Reports: NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Hosler, E. Ramon (Editor); Buckingham, Gregg (Editor)

    2000-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1999 NASA/ASEE Summer Faculty Fellowship Program at the Kennedy Space Center (KSC). This was the 15th year that a NASA/ASEE program has been conducted at KSC. The 1999 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE and the Education Division, NASA Headquarters, Washington, DC, and KSC. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA Headquarters in 1999. The NASA/ASEE Program is intended to be a two-year program to allow in-depth research by the university faculty member.

  3. KSC-98pc908

    NASA Image and Video Library

    1998-08-11

    Center Director Roy Bridges (right) displays the 2000th ISO Certificate Plaque he was given by Dalton Lyon (left) of Det Norske Veritas (DNV), Inc., an international ISO certification organization, at a ceremony at KSC. The plaque is a representation of the ISO 9001 certification awarded to KSC by DNV. ISO 9001 comprises the most detailed, comprehensive set of standard requirements for quality programs established by the International Standards Organization. The presentation followed a successful independent audit by DNV of the KSC Management System in May of this year. The third-party auditors examined about 20 elements of KSC's system, including management responsibility, design control, documentation, test and inspection, and corrective action procedures. DNV found that KSC met or exceeded the stringent quality standards in all areas. KSC will use this certification as a tool to improve an already worldclass team. All NASA centers are required by NASA Administrator Daniel S. Goldin to be ISO 9001 registered by September 1999. NASA is the first federal agency to seek the quality certification

  4. KENNEDY SPACE CENTER, FLA. - KSC Director Jim Kennedy and Glenn Research Center Director Dr. Julian Earls share the stage during the rollout of the One NASA initiative at KSC. Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center. The event was held at the IMAX Theater® where NASA leaders discussed One NASA with selected employees. Explaining how their respective centers contribute to One NASA, along with Kennedy and Earls, were James Jennings, NASA’s associate deputy administrator for institutions and asset management; Ed Weiler, associate administrator for Space Science; Kevin Peterson, Dryden Flight Research Center director; incoming KSC Deputy Director Woodrow Whitlow; and implementation team lead Johnny Stevenson.

    NASA Image and Video Library

    2003-08-20

    KENNEDY SPACE CENTER, FLA. - KSC Director Jim Kennedy and Glenn Research Center Director Dr. Julian Earls share the stage during the rollout of the One NASA initiative at KSC. Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center. The event was held at the IMAX Theater® where NASA leaders discussed One NASA with selected employees. Explaining how their respective centers contribute to One NASA, along with Kennedy and Earls, were James Jennings, NASA’s associate deputy administrator for institutions and asset management; Ed Weiler, associate administrator for Space Science; Kevin Peterson, Dryden Flight Research Center director; incoming KSC Deputy Director Woodrow Whitlow; and implementation team lead Johnny Stevenson.

  5. KENNEDY SPACE CENTER, FLA. - Dryden Flight Research Center Director Kevin Peterson talks about One NASA during the rollout of the Agency initiative at KSC. The event was held at the IMAX Theater® where NASA leaders discussed One NASA with selected employees. Explaining how their respective centers contribute to One NASA, along with Peterson, were KSC Director Jim Kennedy, James Jennings, NASA’s associate deputy administrator for institutions and asset management; Ed Weiler, associate administrator for Space Science; Kevin Peterson, Dryden Flight Research Center director; incoming KSC Deputy Director Woodrow Whitlow; and implementation team lead Johnny Stevenson. Glenn Research Center Director Dr. Julian Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center.

    NASA Image and Video Library

    2003-08-20

    KENNEDY SPACE CENTER, FLA. - Dryden Flight Research Center Director Kevin Peterson talks about One NASA during the rollout of the Agency initiative at KSC. The event was held at the IMAX Theater® where NASA leaders discussed One NASA with selected employees. Explaining how their respective centers contribute to One NASA, along with Peterson, were KSC Director Jim Kennedy, James Jennings, NASA’s associate deputy administrator for institutions and asset management; Ed Weiler, associate administrator for Space Science; Kevin Peterson, Dryden Flight Research Center director; incoming KSC Deputy Director Woodrow Whitlow; and implementation team lead Johnny Stevenson. Glenn Research Center Director Dr. Julian Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center.

  6. KSC-04pd1741

    NASA Image and Video Library

    2004-09-09

    KENNEDY SPACE CENTER, FLA. - A KSC employee uses a fork lift to move equipment relocated from the Thermal Protection System Facility (TPSF), damaged by Hurricane Frances, inside a hangar and storage facility near the KSC Shuttle Landing Facility. Previously, this hangar was used to house the Space Shuttle Columbia debris. Located in Launch Complex 39, the TPSF is used to manufacture both internal and external insulation products for the Space Shuttle orbiters. The storm's path over Florida took it through Cape Canaveral and KSC property during Labor Day weekend.

  7. KSC-03PD-2268

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. A new sign is in place on the NASA Causeway naming the bridge for departing KSC Director Roy D. Bridges Jr. Bridges is leaving KSC to become the director of NASA's Langley Research Center, Hampton, Va. The bridge spans the Banana River on the NASA Causeway and connects Kennedy Space Center and Cape Canaveral Air Force Station.

  8. KSC-03pd2268

    NASA Image and Video Library

    2003-08-06

    KENNEDY SPACE CENTER, FLA. - A new sign is in place on the NASA Causeway naming the bridge for departing KSC Director Roy D. Bridges Jr. Bridges is leaving KSC to become the director of NASA's Langley Research Center, Hampton, Va. The bridge spans the Banana River on the NASA Causeway and connects Kennedy Space Center and Cape Canaveral Air Force Station.

  9. KSC-98pc907

    NASA Image and Video Library

    1998-08-11

    Center Director Roy Bridges displays the ISO 9001 certificate he was awarded by Det Norske Veritas (DNV), Inc., an international ISO certification organization, at a ceremony at KSC. Dalton Lyon of DNV made the presentation, which included a 2000th ISO Certificate Plaque. ISO 9001 comprises the most detailed, comprehensive set of standard requirements for quality programs established by the International Standards Organization. The presentation followed a successful independent audit by DNV of the KSC Management System in May of this year. The third-party auditors examined about 20 elements of KSC's system, including management responsibility, design control, documentation, test and inspection, and corrective action procedures. DNV found that KSC met or exceeded the stringent quality standards in all areas. KSC will use this certification as a tool to improve an already world-class team. All NASA centers are required by NASA Administrator Daniel S. Goldin to be ISO 9001 registered by September 1999. NASA is the first federal agency to seek the quality certification

  10. KSC History Project

    NASA Technical Reports Server (NTRS)

    Moore, Patrick K.

    2002-01-01

    The 2002 NASA/ASEE KSC History Project focused on a series of seven history initiatives designed to acquire, preserve, and interpret the history of Kennedy Space Center. These seven projects included the co-authoring of Voices From the Cape, historical work with NASA historian Roger Launius, the completion of a series of oral histories with key KSC personnel, a monograph on Public Affairs, the development of a Historical Concept Map (CMap) for history knowledge preservation, advice on KSC history database and web interface capabilities, the development of a KSC oral history program and guidelines of training and collection, and the development of collaborative relationships between Kennedy Space Center, the University of West Florida, and the University of Central Florida.

  11. 1998 NASA High-Speed Research Program Aerodynamic Performance Workshop. Volume 2; High Lift

    NASA Technical Reports Server (NTRS)

    McMillin, S. Naomi (Editor)

    1999-01-01

    NASA's High-Speed Research Program sponsored the 1998 Aerodynamic Performance Technical Review on February 9-13, in Los Angeles, California. The review was designed to bring together NASA and industry High-Speed Civil Transport (HSCT) Aerodynamic Performance technology development participants in areas of Configuration Aerodynamics (transonic and supersonic cruise drag prediction and minimization), High-Lift, and Flight Controls. The review objectives were to (1) report the progress and status of HSCT aerodynamic performance technology development; (2) disseminate this technology within the appropriate technical communities; and (3) promote synergy among the scientists and engineers working HSCT aerodynamics. In particular, single- and multi-point optimized HSCT configurations, HSCT high-lift system performance predictions, and HSCT simulation results were presented along with executive summaries for all the Aerodynamic Performance technology areas. The HSR Aerodynamic Performance Technical Review was held simultaneously with the annual review of the following airframe technology areas: Materials and Structures, Environmental Impact, Flight Deck, and Technology Integration. Thus, a fourth objective of the Review was to promote synergy between the Aerodynamic Performance technology area and the other technology areas of the HSR Program.

  12. 1999 NASA High-Speed Research Program Aerodynamic Performance Workshop. Volume 2; High Lift

    NASA Technical Reports Server (NTRS)

    Hahne, David E. (Editor)

    1999-01-01

    The High-Speed Research Program sponsored the NASA High-Speed Research Program Aerodynamic Performance Review on February 8-12, 1999 in Anaheim, California. The review was designed to bring together NASA and industry High-Speed Civil Transport (HSCT) Aerodynamic Performance technology development participants in areas of: Configuration Aerodynamics (transonic and supersonic cruise drag prediction and minimization) and High-Lift. The review objectives were to: (1) report the progress and status of HSCT aerodynamic performance technology development; (2) disseminate this technology within the appropriate technical communities; and (3) promote synergy among the scientist and engineers working HSCT aerodynamics. The HSR AP Technical Review was held simultaneously with the annual review of the following airframe technology areas: Materials and Structures, Environmental Impact, Flight Deck, and Technology Integration Thus, a fourth objective of the Review was to promote synergy between the Aerodynamic Performance technology area and the other technology areas within the airframe element of the HSR Program. This Volume 2/Part 1 publication presents the High-Lift Configuration Development session.

  13. 14 CFR 25.699 - Lift and drag device indicator.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25... each lift or drag device having a separate control in the cockpit to adjust its position. In addition... controls must be clearly marked to identify this range of extension. [Amdt. 25-23, 35 FR 5675, Apr. 8, 1970] ...

  14. 14 CFR 25.699 - Lift and drag device indicator.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25... each lift or drag device having a separate control in the cockpit to adjust its position. In addition... controls must be clearly marked to identify this range of extension. [Amdt. 25-23, 35 FR 5675, Apr. 8, 1970] ...

  15. 14 CFR 25.699 - Lift and drag device indicator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25... each lift or drag device having a separate control in the cockpit to adjust its position. In addition... controls must be clearly marked to identify this range of extension. [Amdt. 25-23, 35 FR 5675, Apr. 8, 1970] ...

  16. KSC-03pd0285

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests, including former KSC Director of Shuttle Processing Robert Sieck (left), KSC lead vehicle manager Kelvin Manning (next), and Columbia's first pilot and former KSC Director Robert Crippen (third from left). The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  17. [Effect of gas-lift device on the morphology and performance of ANAMMOX sludge].

    PubMed

    Li, Xiang; Huang, Yong; Yuan, Yi; Zhou, Cheng; Chen, Zong-Heng; Zhang, Da-Lin

    2014-12-01

    The upflow reactor with gas-lift device was started up by inoculating ANAMMOX sludge granules of less than 0.9 mm. The effects of gas lift device system on the morphology and performance of ANAMMOX sludge were studied by using the nitrogen gas produced in ANAMMOX to drive the effluent circulation in the reactor. The results showed that, the airlift circulation function was not clear in the startup stage of the reactor, because the nitrogen gas production was very low. At the same time, the ANAMMOX granular sludge was easy to condensate. When the load rate of nitrogen removal reached 3.4 kg x (m3 x d)(-1), the function of gas lift was significant, resulting in gradually increased effluent self-circulation, and the granules were dispersed and grew gradually. After 183d of operation, the granular sludge was dominated by the granules with sizes of 1.6-2.5 mm, which accounted for 53.2% of the total sludge volume. The MLVSS content increased with the increase of sludge particle size. The gas lift device had the same function as the external reflux pump, and was helpful for sludge granulation in the ANAMMOX reactor, while reducing power consumption and the cost of the equipment.

  18. KSC-06pd2794

    NASA Image and Video Library

    2006-12-10

    KENNEDY SPACE CENTER, FLA. -- Floating in the Atlantic Ocean about 150 miles north east of Cape Canaveral are the right and left solid rocket boosters, which were jettisoned from the Space Shuttle Discovery two and a half minutes into the ascent to orbit on Dec. 9. Though the boosters landed in the ocean miles from each other, overnight wind and ocean currents allowed the left booster, which was floating higher in the water, to migrate to the location of the right booster. The SRB retrieval team monitored the boosters through the night, and confirmed that the boosters did not contact each other. Both boosters were towed back to Hangar AF at the Cape Canaveral Air Force Station, where the refurbishment operations are now underway. Discovery lifted off from KSC's Launch Pad 39B at 8:47 p.m. EST on mission STS-116. For more information about the process of retrieval, go to http://www-pao.ksc.nasa.gov/kscpao/nasafact/pdf/SRBships06.pdf and http://www.nasa.gov/mission_pages/shuttle/behindscenes/recovery_ships.html. This was the second launch attempt for mission STS-116. The first launch attempt on Dec. 7 was postponed due a low cloud ceiling over Kennedy Space Center. This is Discovery's 33rd mission and the first night launch since 2002. The 20th shuttle mission to the International Space Station, STS-116 carries another truss segment, P5. It will serve as a spacer, mated to the P4 truss that was attached in September. After installing the P5, the crew will reconfigure and redistribute the power generated by two pairs of U.S. solar arrays. Landing is expected Dec. 21 at KSC.

  19. KSC-98pc909

    NASA Image and Video Library

    1998-08-11

    Center Director Roy Bridges speaks to KSC employees at the ISO certification ceremony held at the Training Auditorium. Bridges was presented an ISO 9001 certificate and plaque awarded to KSC by Det Norske Veritas (DNV), Inc., an international ISO certification organization. ISO 9001 comprises the most detailed, comprehensive set of standard requirements for quality programs established by the International Standards Organization. The presentation followed a successful independent audit by DNV of the KSC Management System in May of this year. The third-party auditors examined about 20 elements of KSC's system, including management responsibility, design control, documentation, test and inspection, and corrective action procedures. DNV found that KSC met or exceeded the stringent quality standards in all areas. KSC will use this certification as a tool to improve an already worldclass team. All NASA centers are required by NASA Administrator Daniel S. Goldin to be ISO 9001 registered by September 1999. NASA is the first federal agency to seek the quality certification. Next to Bridges is Heidi Hollingsworth, with the Center for Independent Living, who uses American Sign Language for any hearing-impaired employees in the audience

  20. KSC-03pd0283

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests, including KSC Director Roy Bridges (center) and NASA Administrator Sean O'Keefe (right). The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  1. NASA/ASEE Summer Faculty Fellowship Program. 1994 research reports

    NASA Technical Reports Server (NTRS)

    Anderson, Loren A. (Editor); Hosler, E. Ramon (Editor); Camp, Warren (Editor)

    1994-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1994 NASA/ASEE Summer Faculty Fellowship Program at Kennedy Space Center (KSC). This was the tenth year that a NASA/ASEE program has been conducted at KSC. The 1994 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Office of Educational Affairs, NASA Headquarters, Washington, D.C. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA Headquarters in 1994. The NASA/ASEE program is intended to be a two-year program to allow in-depth research by the University faculty member. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many problems of current interest to NASA/KSC.

  2. KSC-04pd1641

    NASA Image and Video Library

    2004-08-03

    KENNEDY SPACE CENTER, FLA. - In the Space Shuttle Main Engine (SSME) Processing Facility, Boeing-Rocketdyne technicians prepare to move SSME 2058, the first SSME fully assembled at KSC. Move conductor Bob Brackett (on ladder) supervises the placement of a sling around the engine with the assistance of crane operator Joe Ferrante (center) and a technician. The engine will be lifted from its vertical work stand into a horizontal position in preparation for shipment to NASA’s Stennis Space Center in Mississippi to undergo a hot fire acceptance test. It is the first of five engines to be fully assembled on site to reach the desired number of 15 engines ready for launch at any given time in the Space Shuttle program. A Space Shuttle has three reusable main engines. Each is 14 feet long, weighs about 7,800 pounds, is seven-and-a-half feet in diameter at the end of its nozzle, and generates almost 400,000 pounds of thrust. Historically, SSMEs were assembled in Canoga Park, Calif., with post-flight inspections performed at KSC. Both functions were consolidated in February 2002. The Rocketdyne Propulsion and Power division of The Boeing Co. manufactures the engines for NASA.

  3. NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Endeavour on top lifts of

    NASA Technical Reports Server (NTRS)

    2001-01-01

    NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Endeavour on top lifts off from Edwards Air Force Base to begin its ferry flight back to the Kennedy Space Center in Florida.

  4. Detail of crankhandle lifting device. "Foote Bros. Gear & Mach ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of crank-handle lifting device. "Foote Bros. Gear & Mach Corp, Chicago, 01T" appears of the side of the crank - Wellton-Mohawk Irrigation System, Wasteway No. 1, Wellton-Mohawk Canal, North side of Wellton-Mohawk Canal, bounded by Gila River to North & the Union Pacific Railroad & Gila Mountains to south, Wellton, Yuma County, AZ

  5. Data Mining and Knowledge Discover - IBM Cognitive Alternatives for NASA KSC

    NASA Technical Reports Server (NTRS)

    Velez, Victor Hugo

    2016-01-01

    Skillful tools in cognitive computing to transform industries have been found favorable and profitable for different Directorates at NASA KSC. In this study is shown how cognitive computing systems can be useful for NASA when computers are trained in the same way as humans are to gain knowledge over time. Increasing knowledge through senses, learning and a summation of events is how the applications created by the firm IBM empower the artificial intelligence in a cognitive computing system. NASA has explored and applied for the last decades the artificial intelligence approach specifically with cognitive computing in few projects adopting similar models proposed by IBM Watson. However, the usage of semantic technologies by the dedicated business unit developed by IBM leads these cognitive computing applications to outperform the functionality of the inner tools and present outstanding analysis to facilitate the decision making for managers and leads in a management information system.

  6. KSC-98pc156

    NASA Image and Video Library

    1998-01-16

    Celebrating the official opening of the new International Space Station (ISS) Center at Kennedy Space Center are, left to right, James Ball, chief, NASA Public Services, KSC; KSC Director Roy D. Bridges Jr.; Hugh Harris, director, NASA Public Affairs, KSC; and Rick Abramson, president and chief operating officer, Delaware North Parks Services of Spaceport Inc. Center Director Bridges cuts the ribbon to the new tour attraction where full-scale mockups of station modules, through which visitors can walk, are on display. These include the Habitation Unit, where station crew members will live, sleep, and work; a Laboratory Module; and the Pressurized Logistics Module, where racks and supplies will be transported back and forth from KSC to space. Guests also can take an elevated walkway to a gallery overlooking the work are where actual ISS hardware is prepared for flight into space. This new tour site, in addition to a new Launch Complex 39 Observation Gantry, are part of a comprehensive effort by NASA and Delaware North to expand and improve the KSC public tour and visitor facilities

  7. KSC-03pd0312

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. Florida Gov. Jeb Bush is at the podium. Seated to his right are NASA Associate Deputy Administrator for Institutions & Asset Management James L. Jennings, NASA Administrator Sean O'Keefe, and Columbia's first pilot and former KSC Director Robert Crippen. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  8. KSC-03pd0288

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests, including (from left) NASA Associate Deputy Administrator for Institutions and Asset Management James L. Jennings, Florida Gov. Jeb Bush, NASA Administrator Sean O'Keefe, and Columbia's first pilot and former KSC Director Robert Crippen. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  9. KSC-04PD-0787

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Center Director Jim Kennedy (center left) and NASA Administrator Sean OKeefe (center right) wait with their wives, Bernadette and Laura, respectively, for the start of a tour of KSC facilities. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Kennedy and included remarks by NASA Administrator Sean OKeefe, Gov. Jeb Bush, U.S. Mint Director Henrietta Holsman Fore and Deputy Secretary of the Treasury Samuel W. Bodman. Kennedy and OKeefe accompanied by NASA Administrator Sean OKeefe and Center Director Jim Kennedy and their wives.

  10. Advanced transportation system studies. Technical area 2: Heavy lift launch vehicle development. Volume 2; Technical Results

    NASA Technical Reports Server (NTRS)

    1995-01-01

    Sections 10 to 13 of the Advanced Transportation System Studies final report are included in this volume. Section 10 contains a copy of an executive summary that was prepared by Lockheed Space Operations Company (LSOC) to document their support to the TA-2 contract during the first-year period of performance of the contract, May 1992 through May 1993. LSOC participated on the TA-2 contract as part of the concurrent engineering launch system definition team, and provided outstanding heavy lift launch vehicle (HLLV) ground operations requirements and concept assessments for Lockheed Missiles and Space Company (LMSC) through an intercompany work transfer as well as providing specific HLLV ground operations assessments at the direction of NASA KSC through KSC funding that was routed to the TA-2 contract. Section 11 contains a copy of a vehicle-independent, launch system health management requirements assessment. The purpose of the assessment was to define both health management requirements and the associated interfaces between a generic advanced transportation system launch vehicle and all related elements of the entire transportation system, including the ground segment. Section 12 presents the major TA-2 presentations provided to summarize the significant results and conclusions that were developed over the course of the contract. Finally, Section 13 presents the design and assessment report on the first lunar outpost heavy lift launch vehicle.

  11. A Device and Methodology for Measuring Repetitive Lifting VO2max (Oxygen Consumption Rate)

    DTIC Science & Technology

    1987-08-01

    variety of lifting and lowering tasks There have been no dcvice related injuries and little down time due to mechanical failure du ng more than 560 1hours...uptake procedure and is suitable to be used for a wide variety of lifting and lowering tasks. There have been no device related injuries and little...worker productivity and decreased injury rates. What has not been -examined in industrial research is high intensity, maximal effort repetitive lifting

  12. Modeling and Simulation of the ARES UPPER STAGE Transportation, Lifting, Stacking and Mating Operations Within the Vehicle Assembly Building at KSC

    NASA Technical Reports Server (NTRS)

    Kromis, Phillip A.

    2010-01-01

    This viewgraph presentation describes the modeling and simulation of the Ares Upper Stage Transportation, lifting, stacking, and mating operations within the Vehicle Assembly Building (VAB) at Kennedy Space Center (KSC). An aerial view of KSC Launch Shuttle Complex, two views of the Delmia process control layout, and an upper stage move subroutine and breakdown are shown. An overhead image of the VAB and the turning basin along with the Pegasus barge at the turning basin are also shown. This viewgraph presentation also shows the actual design and the removal of the mid-section spring tensioners, the removal of the AFT rear and forward tensioners tie downs, and removing the AFT hold down post and mount. US leaving the Pegasus Barge, the upper stage arriving at transfer aisle, upper stage receiving/inspection in transfer aisle, and an overhead view of upper stage receiving/inspection in transfer aisle are depicted. Five views of the actual connection of the cabling to the upper stage aft lifting hardware are shown. The upper stage transporter forward connector, two views of the rotation horizontal to vertical, the disconnection of the rear bolt ring cabling, the lowering of the upper stage to the inspection stand, disconnection of the rear bolt ring from the upper stage, the lifting of the upper stage and inspection of AFT fange, and the transfer of upper stage in an integrated stack are shown. Six views of the mating of the upper stage to the first stage are depicted. The preparation, inspection, and removal of the forward dome are shown. The upper stage mated on the integrated stack and crawler is also shown. This presentation concludes with A Rapid Upper Limb Assessment (RULA) utilizing male and female models for assessing risk factors to the upper extremities of human beings in an actual physical environment.

  13. KSC-03pd0287

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests, including Florida Gov. Jeb Bush (left), NASA Administrator Sean O'Keefe (center), and Columbia's first pilot and former KSC Director Robert Crippen (right). The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  14. 1999 NASA High-Speed Research Program Aerodynamic Performance Workshop. Volume 2; High Lift

    NASA Technical Reports Server (NTRS)

    Hahne, David E. (Editor)

    1999-01-01

    NASA's High-Speed Research Program sponsored the 1999 Aerodynamic Performance Technical Review on February 8-12, 1999 in Anaheim, California. The review was designed to bring together NASA and industry High-Speed Civil Transport (HSCT) Aerodynamic Performance technology development participants in the areas of Configuration Aerodynamics (transonic and supersonic cruise drag prediction and minimization), High Lift, and Flight Controls. The review objectives were to (1) report the progress and status of HSCT aerodynamic performance technology development; (2) disseminate this technology within the appropriate technical communities; and (3) promote synergy among die scientists and engineers working on HSCT aerodynamics. In particular, single and midpoint optimized HSCT configurations, HSCT high-lift system performance predictions, and HSCT simulation results were presented, along with executive summaries for all the Aerodynamic Performance technology areas. The HSR Aerodynamic Performance Technical Review was held simultaneously with the annual review of the following airframe technology areas: Materials and Structures, Environmental Impact, Flight Deck, and Technology Integration. Thus, a fourth objective of the Review was to promote synergy between the Aerodynamic Performance technology area and the other technology areas of the HSR Program. This Volume 2/Part 2 publication covers the tools and methods development session.

  15. KSC-04PD-1882

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. In the Debus Center at the KSC Visitor Complex, employees help themselves to a variety of Hispanic foods during the Centers annual Hispanic American Heritage luncheon. The theme was Hispanic Americans Making a Difference and featured guest speaker Charles A. Gambaro, NASA KSC engineering lead and Combat Engineering Group commander, who recently returned from Operation Iraqi Freedom. Hosted by the Hispanic Employment Program Working Group, the luncheon also provided live cultural entertainment. The annual event helps employees reflect on the extensive contributions Hispanics have made to KSC, NASA and the nation.

  16. NASA/ASEE Faculty Fellowship Program: 2003 Research Reports

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim (Editor); LopezdeCastillo, Eduardo (Editor)

    2003-01-01

    This document is a collection of technical reports on research conducted by the participants in the 2003 NASA/ASEE Faculty Fellowship Program at the John F. Kennedy Space Center (KSC). This was the nineteenth year that a NASA/ASEE program has been conducted at KSC. The 2003 program was administered by the University of Central Florida (UCF) in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) and the Education Division, NASA Headquarters, Washington, D.C. The KSC program was one of nine such Aeronautics and Space Research Programs funded by NASA Headquarters in 2003. The basic common objectives of the NASA/ASEE Faculty Fellowship Program are: A) To further the professional knowledge of qualified engineering and science faculty members; B) To stimulate an exchange of ideas between teaching participants and employees of NASA; C) To enrich and refresh the research and teaching activities of participants institutions; D) To contribute to the research objectives of the NASA center. The KSC Faculty Fellows spent ten weeks (May 19 through July 25, 2003) working with NASA scientists and engineers on research of mutual interest to the university faculty member and the NASA colleague. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many research areas of current interest to NASA/KSC. A separate document reports on the administrative aspects of the 2003 program. The NASA/ASEE program is intended to be a two-year program to allow in-depth research by the university faculty member. In many cases a faculty member has developed a close working relationship with a particular NASA group that had provided funding beyond the two-year limit.

  17. Wingless Flight: The Lifting Body Story

    NASA Technical Reports Server (NTRS)

    Reed, R. Dale; Lister, Darlene (Editor); Huntley, J. D. (Editor)

    1997-01-01

    Wingless Flight tells the story of the most unusual flying machines ever flown, the lifting bodies. It is my story about my friends and colleagues who committed a significant part of their lives in the 1960s and 1970s to prove that the concept was a viable one for use in spacecraft of the future. This story, filled with drama and adventure, is about the twelve-year period from 1963 to 1975 in which eight different lifting-body configurations flew. It is appropriate for me to write the story, since I was the engineer who first presented the idea of flight-testing the concept to others at the NASA Flight Research Center. Over those twelve years, I experienced the story as it unfolded day by day at that remote NASA facility northeast of los Angeles in the bleak Mojave Desert. Benefits from this effort immediately influenced the design and operational concepts of the winged NASA Shuttle Orbiter. However, the full benefits would not be realized until the 1990s when new spacecraft such as the X-33 and X-38 would fully employ the lifting-body concept. A lifting body is basically a wingless vehicle that flies due to the lift generated by the shape of its fuselage. Although both a lifting reentry vehicle and a ballistic capsule had been considered as options during the early stages of NASA's space program, NASA initially opted to go with the capsule. A number of individuals were not content to close the book on the lifting-body concept. Researchers including Alfred Eggers at the NASA Ames Research Center conducted early wind-tunnel experiments, finding that half of a rounded nose-cone shape that was flat on top and rounded on the bottom could generate a lift-to-drag ratio of about 1.5 to 1. Eggers' preliminary design sketch later resembled the basic M2 lifting-body design. At the NASA Langley Research Center, other researchers toyed with their own lifting-body shapes. Meanwhile, some of us aircraft-oriented researchers at the, NASA Flight Research Center at Edwards Air

  18. KENNEDY SPACE CENTER, FLA. - At the rollout of the One NASA initiative at KSC, Glenn Research Center Director Dr. Julian Earls embraces implementation team lead Johnny Stevenson while KSC Director Jim Kennedy (left) applauds. Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center. The event was held at the IMAX Theater® where NASA leaders discussed One NASA with selected employees. Explaining how their respective centers contribute to One NASA, along with Kennedy and Earls, were James Jennings, NASA’s associate deputy administrator for institutions and asset management; Ed Weiler, associate administrator for Space Science; Kevin Peterson, Dryden Flight Research Center director; incoming KSC Deputy Director Woodrow Whitlow; and implementation team lead Johnny Stevenson.

    NASA Image and Video Library

    2003-08-20

    KENNEDY SPACE CENTER, FLA. - At the rollout of the One NASA initiative at KSC, Glenn Research Center Director Dr. Julian Earls embraces implementation team lead Johnny Stevenson while KSC Director Jim Kennedy (left) applauds. Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center. The event was held at the IMAX Theater® where NASA leaders discussed One NASA with selected employees. Explaining how their respective centers contribute to One NASA, along with Kennedy and Earls, were James Jennings, NASA’s associate deputy administrator for institutions and asset management; Ed Weiler, associate administrator for Space Science; Kevin Peterson, Dryden Flight Research Center director; incoming KSC Deputy Director Woodrow Whitlow; and implementation team lead Johnny Stevenson.

  19. KSC00pp0939

    NASA Image and Video Library

    2000-07-20

    After being involved in a minor derailment incident during a routine movement on the tracks, rail cars carrying solid rocket booster segments sit idle. The rail cars were being moved as part of a standard operation to “order” the cars, placing them into a proper sequence for upcoming segment processing activities. The rear wheels of one car and the front wheels of the car behind it slid off the tracks while passing through a railway switch onto a siding. They were traveling approximately 3 miles per hour at the time, about normal walking speed. No damage occurred to the SRB segments, or to the devices that secure the segments to the rail cars. The incident occurred on KSC property, just north of the NASA Causeway in the KSC Industrial Area

  20. KSC-00pp0934

    NASA Image and Video Library

    2000-07-20

    One of two solid rocket booster rail cars is off the track after being involved in a minor derailment incident during a routine movement on the tracks. The rail cars were being moved as part of a standard operation to “order” the cars, placing them into a proper sequence for upcoming segment processing activities. The rear wheels of one car and the front wheels of the car behind it slid off the tracks while passing through a railway switch onto a siding. They were traveling approximately 3 miles per hour at the time, about normal walking speed. No damage occurred to the SRB segments, or to the devices that secure the segments to the rail cars. The incident occurred on KSC property, just north of the NASA Causeway in the KSC Industrial Area

  1. KSC00pp0934

    NASA Image and Video Library

    2000-07-20

    One of two solid rocket booster rail cars is off the track after being involved in a minor derailment incident during a routine movement on the tracks. The rail cars were being moved as part of a standard operation to “order” the cars, placing them into a proper sequence for upcoming segment processing activities. The rear wheels of one car and the front wheels of the car behind it slid off the tracks while passing through a railway switch onto a siding. They were traveling approximately 3 miles per hour at the time, about normal walking speed. No damage occurred to the SRB segments, or to the devices that secure the segments to the rail cars. The incident occurred on KSC property, just north of the NASA Causeway in the KSC Industrial Area

  2. KSC-00pp0939

    NASA Image and Video Library

    2000-07-20

    After being involved in a minor derailment incident during a routine movement on the tracks, rail cars carrying solid rocket booster segments sit idle. The rail cars were being moved as part of a standard operation to “order” the cars, placing them into a proper sequence for upcoming segment processing activities. The rear wheels of one car and the front wheels of the car behind it slid off the tracks while passing through a railway switch onto a siding. They were traveling approximately 3 miles per hour at the time, about normal walking speed. No damage occurred to the SRB segments, or to the devices that secure the segments to the rail cars. The incident occurred on KSC property, just north of the NASA Causeway in the KSC Industrial Area

  3. KSC-03pd0300

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. Columbia's first pilot and former KSC Director Robert Crippen is at the podium. Seated to his right are NASA Associate Deputy Administrator for Institutions and Asset Management James L. Jennings, Florida Gov. Jeb Bush, and NASA Administrator Sean O'Keefe. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  4. KSC-03pd0299

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. NASA Administrator Sean O'Keefe is at the podium. Seated to his right are NASA Associate Deputy Administrator for Institutions and Asset Management James L. Jennings, Florida Gov. Jeb Bush, and Columbia's first pilot and former KSC Director Robert Crippen. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  5. KSC-03pd0298

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. NASA Administrator Sean O'Keefe is at the podium. Seated to his right are NASA Associate Deputy Administrator for Institutions and Asset Management James L. Jennings, Florida Gov. Jeb Bush, and Columbia's first pilot and former KSC Director Robert Crippen. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  6. KENNEDY SPACE CENTER, FLA. - KSC Director Jim Kennedy (left) and incoming KSC Deputy Director Woodrow Whitlow talk about One NASA during the rollout of the Agency initiative at KSC. They were joined at the IMAX Theater® by other NASA leaders James Jennings, NASA’s associate deputy administrator for institutions and asset management; Ed Weiler, associate administrator for Space Science; Kevin Peterson, Dryden Flight Research Center director; and implementation team lead Johnny Stevenson to explain how their respective centers contribute to One NASA. Glenn Research Center Director Dr. Julian Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center.

    NASA Image and Video Library

    2003-08-20

    KENNEDY SPACE CENTER, FLA. - KSC Director Jim Kennedy (left) and incoming KSC Deputy Director Woodrow Whitlow talk about One NASA during the rollout of the Agency initiative at KSC. They were joined at the IMAX Theater® by other NASA leaders James Jennings, NASA’s associate deputy administrator for institutions and asset management; Ed Weiler, associate administrator for Space Science; Kevin Peterson, Dryden Flight Research Center director; and implementation team lead Johnny Stevenson to explain how their respective centers contribute to One NASA. Glenn Research Center Director Dr. Julian Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center.

  7. KSC-2012-3572

    NASA Image and Video Library

    2012-06-28

    CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, workers inside the Operations and Checkout Building high bay detach a lifting device from the transportation canister holding the Orion crew module. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. NASA's Michoud Assembly Facility in New Orleans built the crew module pressure vessel. The Orion production team will prepare the module for flight by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Charisse Nahser

  8. KSC-2012-3569

    NASA Image and Video Library

    2012-06-28

    CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, workers inside the Operations and Checkout Building high bay attach a lifting device to the transportation canister holding the Orion crew module. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. NASA's Michoud Assembly Facility in New Orleans built the crew module pressure vessel. The Orion production team will prepare the module for flight by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Charisse Nahser

  9. A fundamental study of drag and an assessment of conventional drag-due-to-lift reduction devices

    NASA Astrophysics Data System (ADS)

    Yates, J. E.; Donald, C. D.

    1986-09-01

    The integral conservation laws of fluid mechanics are used to assess the drag efficiency of lifting wings, both CTOL and various out-of-plane configurations. The drag-due-to-lift is separated into two major components: (1) the induced drag-due-to-lift that depends on aspect ratio but is relatively independent of Reynolds number; (2) the form drag-due-to-lift that is independent of aspect ratio but dependent on the details of the wing section design, planform and Reynolds number. For each lifting configuration there is an optimal load distribution that yields the minimum value of drag-due-to-lift. For well designed high aspect ratio CTOL wings the two drag components are independent. With modern design technology CTOL wings can be (and usually are) designed with a drag-due-to-lift efficiency close to unity. Wing tip-devices (winglets, feathers, sails, etc.) can improve drag-due-to-lift efficiency by 10 to 15% if they are designed as an integral part of the wing. As add-on devices they can be detrimental. It is estimated that 25% improvements of wing drag-due-to-lift efficiency can be obtained with joined tip configurations and vertically separated lifting elements without considering additional benefits that might be realized by improved structural efficiency. It is strongly recommended that an integrated aerodynamic/structural approach be taken in the design of (or research on) future out-of-plane configurations.

  10. A fundamental study of drag and an assessment of conventional drag-due-to-lift reduction devices

    NASA Technical Reports Server (NTRS)

    Yates, J. E.; Donald, C. D.

    1986-01-01

    The integral conservation laws of fluid mechanics are used to assess the drag efficiency of lifting wings, both CTOL and various out-of-plane configurations. The drag-due-to-lift is separated into two major components: (1) the induced drag-due-to-lift that depends on aspect ratio but is relatively independent of Reynolds number; (2) the form drag-due-to-lift that is independent of aspect ratio but dependent on the details of the wing section design, planform and Reynolds number. For each lifting configuration there is an optimal load distribution that yields the minimum value of drag-due-to-lift. For well designed high aspect ratio CTOL wings the two drag components are independent. With modern design technology CTOL wings can be (and usually are) designed with a drag-due-to-lift efficiency close to unity. Wing tip-devices (winglets, feathers, sails, etc.) can improve drag-due-to-lift efficiency by 10 to 15% if they are designed as an integral part of the wing. As add-on devices they can be detrimental. It is estimated that 25% improvements of wing drag-due-to-lift efficiency can be obtained with joined tip configurations and vertically separated lifting elements without considering additional benefits that might be realized by improved structural efficiency. It is strongly recommended that an integrated aerodynamic/structural approach be taken in the design of (or research on) future out-of-plane configurations.

  11. Chronology of KSC and KSC-related events for 1985

    NASA Technical Reports Server (NTRS)

    Nail, Ken, Jr.; Liston, Elaine

    1986-01-01

    A chronology of developments and events at the Kennedy Space Center (KSC) in 1985 documents the KSC role in NASA's progress. The chronology serves as a reference source for historians and other researchers. Arrangement is by day and month. Individual articles are attributed to published sources.

  12. KSC-04pd1882

    NASA Image and Video Library

    2004-09-22

    KENNEDY SPACE CENTER, FLA. - In the Debus Center at the KSC Visitor Complex, employees help themselves to a variety of Hispanic foods during the Center’s annual Hispanic American Heritage luncheon. The theme was “Hispanic Americans Making a Difference” and featured guest speaker Charles A. Gambaro, NASA KSC engineering lead and Combat Engineering Group commander, who recently returned from Operation Iraqi Freedom. Hosted by the Hispanic Employment Program Working Group, the luncheon also provided live cultural entertainment. The annual event helps employees reflect on the extensive contributions Hispanics have made to KSC, NASA and the nation.

  13. KSC-06pd2078

    NASA Image and Video Library

    2006-09-08

    KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Pilot Christopher Ferguson dons his launch and re-entry suit before heading to the launch pad. Ferguson is making his first shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett

  14. KSC-06pd2079

    NASA Image and Video Library

    2006-09-08

    KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Commander Brent Jett dons his launch and re-entry suit before heading to the launch pad. Jett is making his fourth shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett

  15. KSC-06pd2076

    NASA Image and Video Library

    2006-09-08

    KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Joseph Tanner dons his launch and re-entry suit before heading to the launch pad. Tanner is making his fourth shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett

  16. KSC-06pd2082

    NASA Image and Video Library

    2006-09-08

    KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Heidemarie Stefanyshyn-Piper is helped with her launch and re-entry suit before heading to the launch pad. Stefanyshyn-Piper is making her first shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett

  17. KSC-02pd1480

    NASA Image and Video Library

    2002-10-08

    KENNEDY SPACE CENTER, FLA. - Adam Kissiah (right), a retired NASA-KSC engineer, looks at a photo of Allan Dianic's daughter, who has benefited from a cochlear implant that Kissiah developed while at NASA. Dianic (left) is a software engineer with ENSCO. Kissiah received an exceptional category NASA Space Act Award for his 25-year-old technology breakthrough during a technology awards luncheon held at the KSC Visitor Complex Debus Center. The award included a monetary award and a certificate signed by the NASA Administrator. Space Act Awards provide official recognition and grant equitable monetary awards for inventions and scientific and technical contributions that have helped achieve NASA's aeronautical and space goals.

  18. The 1995 Research Reports: NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Hosler, E. Ramon (Editor); Buckingham, Gregg (Editor)

    1995-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1995 NASA/ASEE Summer Faculty Fellowship Program at the Kennedy Space Center (KSC). This was the eleventh year that a NASA/ASEE program has been conducted at KSC. The 1995 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Office of Educational Affairs, NASA Headquarters, Washington, D.C. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA Headquarters in 1995. The NASA/ASEE Program is intended to be a two-year program to allow in-depth research by the University faculty member.

  19. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Information from NASA's Tech Transfer Office is on display at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  20. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Attendees speak to representatives from NASA's Office of Small Business Programs during Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  1. KSC-04PD-0797

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Former astronaut Winston Scott (left) presents a NASA flag flown at the KSC Space Life Sciences Lab to NASA Administrator Sean OKeefe. The flag was flown during construction through the dedication of the Lab. The presentation was during a tour of the Lab following the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Center Director Jim Kennedy and included remarks by OKeefe, Florida Gov. Jeb Bush, U.S. Mint Director Henrietta Holsman Fore and Deputy Secretary of the Treasury Samuel W. Bodman. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida.

  2. KSC-04PD-0798

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Former astronaut Winston Scott (left) presents a NASA flag flown at the KSC Space Life Sciences Lab to NASA Administrator Sean OKeefe. The flag was flown during construction through the dedication of the Lab. The presentation was during a tour of the Lab following the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Center Director Jim Kennedy and included remarks by OKeefe, Florida Gov. Jeb Bush, U.S. Mint Director Henrietta Holsman Fore and Deputy Secretary of the Treasury Samuel W. Bodman. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida.

  3. KSC-00padig016

    NASA Image and Video Library

    2000-04-22

    KENNEDY SPACE CENTER, FLA. -- After a successful dive, the one-man submarine known as DeepWorker 2000 is lifted from Atlantic waters near Cape Canaveral, Fla., onto the deck of the Liberty Star, one of two KSC solid rocket booster recovery ships. Inside the sub is the pilot, Anker Rasmussen. The sub is being tested on its ability to duplicate the sometimes hazardous job United Space Alliance (USA) divers perform to recover the expended boosters in the ocean after a launch. The boosters splash down in an impact area about 140 miles east of Jacksonville and after recovery are towed back to KSC for refurbishment by the specially rigged recovery ships. DeepWorker 2000 will be used in a demonstration during retrieval operations after the upcoming STS-101 launch. The submarine pilot will demonstrate capabilities to cut tangled parachute riser lines using a manipulator arm and attach a Diver Operator Plug to extract water and provide flotation for the booster. DeepWorker 2000 was built by Nuytco Research Ltd., North Vancouver, British Columbia. It is 8.25 feet long, 5.75 feet high, and weighs 3,800 pounds. USA is a prime contractor to NASA for the Space Shuttle program

  4. KSC00padig016

    NASA Image and Video Library

    2000-04-22

    KENNEDY SPACE CENTER, FLA. -- After a successful dive, the one-man submarine known as DeepWorker 2000 is lifted from Atlantic waters near Cape Canaveral, Fla., onto the deck of the Liberty Star, one of two KSC solid rocket booster recovery ships. Inside the sub is the pilot, Anker Rasmussen. The sub is being tested on its ability to duplicate the sometimes hazardous job United Space Alliance (USA) divers perform to recover the expended boosters in the ocean after a launch. The boosters splash down in an impact area about 140 miles east of Jacksonville and after recovery are towed back to KSC for refurbishment by the specially rigged recovery ships. DeepWorker 2000 will be used in a demonstration during retrieval operations after the upcoming STS-101 launch. The submarine pilot will demonstrate capabilities to cut tangled parachute riser lines using a manipulator arm and attach a Diver Operator Plug to extract water and provide flotation for the booster. DeepWorker 2000 was built by Nuytco Research Ltd., North Vancouver, British Columbia. It is 8.25 feet long, 5.75 feet high, and weighs 3,800 pounds. USA is a prime contractor to NASA for the Space Shuttle program

  5. Design and Analyze a New Measuring Lift Device for Fin Stabilizers Using Stiffness Matrix of Euler-Bernoulli Beam

    PubMed Central

    Liang, Lihua; Sun, Mingxiao; Shi, Hongyu; Luan, Tiantian

    2017-01-01

    Fin-angle feedback control is usually used in conventional fin stabilizers, and its actual anti-rolling effect is difficult to reach theoretical design requirements. Primarily, lift of control torque is a theoretical value calculated by static hydrodynamic characteristics of fin. However, hydrodynamic characteristics of fin are dynamic while fin is moving in waves. As a result, there is a large deviation between actual value and theoretical value of lift. Firstly, the reasons of deviation are analyzed theoretically, which could avoid a variety of interference factors and complex theoretical derivations. Secondly, a new device is designed for direct measurement of actual lift, which is composed of fin-shaft combined mechanism and sensors. This new device can make fin-shaft not only be the basic function of rotating fin, but also detect actual lift. Through analysis using stiffness matrix of Euler-Bernoulli beam, displacement of shaft-core end is measured instead of lift which is difficult to measure. Then quantitative relationship between lift and displacement is defined. Three main factors are analyzed with quantitative relationship. What is more, two installation modes of sensors and a removable shaft-end cover are proposed according to hydrodynamic characteristics of fin. Thus the new device contributes to maintenance and measurement. Lastly, the effectiveness and accuracy of device are verified by contrasting calculation and simulation on the basis of actual design parameters. And the new measuring lift method can be proved to be effective through experiments. The new device is achieved from conventional fin stabilizers. Accordingly, the reliability of original equipment is inherited. The alteration of fin stabilizers is minor, which is suitable for engineering application. In addition, the flexural properties of fin-shaft are digitized with analysis of stiffness matrix. This method provides theoretical support for engineering application by carrying out finite

  6. KSC-03pd0578

    NASA Image and Video Library

    2003-03-04

    KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.

  7. KSC-03PD-0578

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.

  8. KSC-03pd0284

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests, including former astronaut and KSC Director Robert Crippen (center). The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  9. KSC-03pd0304

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. KSC Director and former astronaut Roy D. Bridges, Jr., is seated third from right. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  10. KSC-03pd1114

    NASA Image and Video Library

    2003-04-09

    KENNEDY SPACE CENTER, FLA. -- Space Gateway Support Security Officer Jeff Ellison signs in a worker at the Nacogdoches site. In the background, NASA site lead Ronnie Lawson (left) speaks with his United Space Alliance counterpart George Odom. Kennedy Space Center workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  11. KSC-03pd1110

    NASA Image and Video Library

    2003-04-09

    KENNEDY SPACE CENTER, FLA. -- NASA Kennedy Space Center engineer Lamar Russell, who is serving as team lead for debris siting reports outside of Texas, points out to his Lufkin Command Center team a location targeted for a grid search. Kennedy Space Center workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  12. KSC-04PD-0020

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- From the KSC television studio, KSC management and other employees applaud President George W. Bush, who addressed the public and an assembly of government officials at NASA Headquarters as he outlined a new focus and vision for the space agency. Shown from left are Mike Leinbach, Shuttle launch director; David Culp, with NASA; Steve Francois, director, Launch Services Program; Richard Cota, deputy chief financial officer, KSC; Bill Pickavance vice president and associate program manager of Florida Operations, United Space Alliance (USA) ; Howard DeCastro, vice president and Space Shuttle program manager, USA; Shannon Roberts, with External Affairs; Woodrow Whitlow, KSC deputy director; Bruce Buckingham, assistant to Dr. Whitlow; Lisa Malone, director of External Affairs; Ken Aguilar, chief, Equal Opportunity office; and Cheryl Cox, External Affairs. The President stated his goals for NASAs new mission: Completing the International Space Station, retiring the Space Shuttle orbiters, developing a new crew exploration vehicle, and returning to the moon and beyond within the next two decades. Pres. Bush was welcomed by NASA Administrator Sean OKeefe and Expedition 8 Commander Michael Foale, who greeted him from the International Space Station. Members of the Washington, D.C., audience included astronauts Eileen Collins, Ed Lu and Michael Lopez-Alegria, and former astronaut Gene Cernan

  13. KSC-02pd0146

    NASA Image and Video Library

    2002-02-15

    KENNEDY SPACE CENTER, Fla. - The new NASA Administrator Sean O'Keefe (left) is presented with a can of Bush's original baked beans by space reporter Jim Banke in the KSC Newsroom. The administrator was at KSC on an agencywide familiarization tour of NASA field centers. He was nominated for the position as administrator in November 2001 by President George W. Bush. He was sworn in Dec. 21 as the agency's tenth chief

  14. Lift Recovery for AFC-Enabled High Lift System

    NASA Technical Reports Server (NTRS)

    Shmilovich, Arvin; Yadlin, Yoram; Dickey, Eric D.; Gissen, Abraham N.; Whalen, Edward A.

    2017-01-01

    This project is a continuation of the NASA AFC-Enabled Simplified High-Lift System Integration Study contract (NNL10AA05B) performed by Boeing under the Fixed Wing Project. This task is motivated by the simplified high-lift system, which is advantageous due to the simpler mechanical system, reduced actuation power and lower maintenance costs. Additionally, the removal of the flap track fairings associated with conventional high-lift systems renders a more efficient aerodynamic configuration. Potentially, these benefits translate to a approx. 2.25% net reduction in fuel burn for a twin-engine, long-range airplane.

  15. KENNEDY SPACE CENTER, FLA. - NASA leaders discuss the Agency’s One NASA initiative with selected employees at the KSC Visitor Complex IMAX Theater®. From left are KSC Director Jim Kennedy; James Jennings, NASA’s associate deputy administrator for institutions and asset management; Ed Weiler, associate administrator for Space Science; Kevin Peterson, Dryden Flight Research Center director; incoming KSC Deputy Director Woodrow Whitlow; and implementation team lead Johnny Stevenson. Glenn Research Center Director Dr. Julian Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center.

    NASA Image and Video Library

    2003-08-20

    KENNEDY SPACE CENTER, FLA. - NASA leaders discuss the Agency’s One NASA initiative with selected employees at the KSC Visitor Complex IMAX Theater®. From left are KSC Director Jim Kennedy; James Jennings, NASA’s associate deputy administrator for institutions and asset management; Ed Weiler, associate administrator for Space Science; Kevin Peterson, Dryden Flight Research Center director; incoming KSC Deputy Director Woodrow Whitlow; and implementation team lead Johnny Stevenson. Glenn Research Center Director Dr. Julian Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center.

  16. KSC-2010-4454B

    NASA Image and Video Library

    2010-07-29

    CAPE CANAVERAL, Fla. -- This is a printable version of space shuttle Endeavour's orbiter tribute, or OV-105, which hangs in Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida. It features Endeavour soaring into orbit above the sailing vessel HMS Endeavour for which it was named. The Cupola, delivered to the International Space Station by Endeavour on STS-130, frames various images that represent the processing and execution of the Space Shuttle Program. Clockwise from top, are the first-ever use of a drag chute during the STS-49 landing, rollout to a launch pad, a ferry flight return to Kennedy, rolling into an orbiter processing facility, docking to the International Space Station, and lifting operations before being mated to an external fuel tank and solid rocket boosters in the Vehicle Assembly Building. The background image was captured by the Hubble Space Telescope and signifies the first shuttle servicing mission, which was performed by Endeavour's STS-61 crew. Crew-designed patches from Endeavour’s maiden voyage through its final mission are shown ascending toward the stars. Five orbiter tributes are on display in the firing room, representing Atlantis, Challenger, Columbia, Endeavour and Discovery. Graphic design credit: NASA/Amy Lombardo. NASA publication number: SP-2010-08-165-KSC

  17. KSC-2010-4454A

    NASA Image and Video Library

    2010-07-29

    CAPE CANAVERAL, Fla. -- This is a version of space shuttle Endeavour's orbiter tribute, or OV-105, which hangs in Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida. It features Endeavour soaring into orbit above the sailing vessel HMS Endeavour for which it was named. The Cupola, delivered to the International Space Station by Endeavour on STS-130, frames various images that represent the processing and execution of the Space Shuttle Program. Clockwise from top, are the first-ever use of a drag chute during the STS-49 landing, rollout to a launch pad, a ferry flight return to Kennedy, rolling into an orbiter processing facility, docking to the International Space Station, and lifting operations before being mated to an external fuel tank and solid rocket boosters in the Vehicle Assembly Building. The background image was captured by the Hubble Space Telescope and signifies the first shuttle servicing mission, which was performed by Endeavour's STS-61 crew. Crew-designed patches from Endeavour’s maiden voyage through its final mission are shown ascending toward the stars. Five orbiter tributes are on display in the firing room, representing Atlantis, Challenger, Columbia, Endeavour and Discovery. Graphic design credit: NASA/Amy Lombardo. NASA publication number: SP-2010-08-165-KSC

  18. Exploration Launch Projects RS-68B Engine Requirements for NASA's Heavy Lift Ares V

    NASA Technical Reports Server (NTRS)

    Sumrall, John P.; McArthur, J. Craig; Lacey, Matt

    2007-01-01

    NASA's Vision for Exploration requires a safe, efficient, reliable, and versatile launch vehicle capable of placing large payloads into Earth orbit for transfer to the Moon and destinations beyond. The Ares V Cargo Launch Vehicle (CaLV) will provide this heavy lift capability. The Ares V launch concept is shown in Fig. 1. When it stands on the launch pad at Kennedy Space Center late in the next decade, the Ares V stack will be almost 360 feet tall. As currently envisioned, it will lift 133,000 to 144,000 pounds to trans-lunar injection, depending on the length of loiter time on Earth orbit. This presentation will provide an overview of the Constellation architecture, the Ares launch vehicles, and, specifically, the latest developments in the RS-68B engine for the Ares V.

  19. STS-65 Columbia, OV-102, lifts off from KSC LC Pad 39A

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Columbia, Orbiter Vehicle (OV) 102, begins its roll maneuver after clearing the fixed service structure (FSS) tower as it rises above Kennedy Space Center (KSC) Launch Complex (LC) Pad 39A. In the foreground of this horizontal scene is Florida brush and a waterway. Beyond the brush, the shuttle's exhaust cloud envelops the immediate launch pad area. Launch occurred at 12:43 pm Eastern Daylight Time (EDT). The glow of the space shuttle main engine (SSME) and solid rocket booster (SRB) firings is reflected in the nearby waterway. Once in Earth orbit, STS-65's six NASA astronauts and a Japanese Payload Specialist aboard OV-102 will begin two weeks of experimentation in support of the second International Microgravity Laboratory (IML-2).

  20. STS-65 Columbia, OV-102, lifts off from KSC LC Pad 39A

    NASA Image and Video Library

    1994-07-08

    Columbia, Orbiter Vehicle (OV) 102, begins its roll maneuver after clearing the fixed service structure (FSS) tower as it rises above Kennedy Space Center (KSC) Launch Complex (LC) Pad 39A. In the foreground of this horizontal scene is Florida brush and a waterway. Beyond the brush, the shuttle's exhaust cloud envelops the immediate launch pad area. Launch occurred at 12:43 pm Eastern Daylight Time (EDT). The glow of the space shuttle main engine (SSME) and solid rocket booster (SRB) firings is reflected in the nearby waterway. Once in Earth orbit, STS-65's six NASA astronauts and a Japanese Payload Specialist aboard OV-102 will begin two weeks of experimentation in support of the second International Microgravity Laboratory (IML-2).

  1. KSC-03pd0289

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests, including NASA Administrator Sean O'Keefe. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  2. KSC-04PD-1883

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Guest speaker Charles A. Gambaro, NASA KSC engineering lead and Combat Engineering Group commander, speaks to an appreciative audience during KSCs annual Hispanic American Heritage luncheon. The theme was Hispanic Americans Making a Difference. Gambaro recently returned from Operation Iraqi Freedom. Hosted by the Hispanic Employment Program Working Group, the luncheon also provided live cultural entertainment. The annual event helps employees reflect on the extensive contributions Hispanics have made to KSC, NASA and the nation.

  3. STS-49 Endeavour, Orbiter Vehicle (OV) 105, lifts off from KSC LC Pad 39B

    NASA Image and Video Library

    1992-05-07

    STS049-S-251 (7 May 1992) --- The Space Shuttle Endeavour soars toward Earth orbit where a crew of seven NASA astronauts will spend at least a week. Endeavour, the newest orbiter in NASA's Space Shuttle fleet, lifted off from Pad 39B at 7:40 p.m. (EDT), May 7, 1992. A diamond shock effect can be seen beneath the three main engines. Onboard are astronauts Daniel C. Brandenstein, mission commander; Kevin P. Chilton, pilot; and Richard J. Hieb, Bruce E. Melnick, Pierre J. Thuot, Kathryn C. Thornton and Thomas D. Akers, all mission specialists.

  4. KSC01padig062

    NASA Image and Video Library

    2001-02-08

    At a groundbreaking ceremony at KSC, Florida’s Lt. Gov. Frank Brogan expresses his support of the Center’s growth and important role of technology, especially through the International Space Station. The groundbreaking is for a roadway, to be known as Space Commerce Way, that will serve the public by providing a 24-hour access route through KSC from S.R. 3 to the NASA Causeway and KSC Visitor Complex. It is the start of a construction project that includes the Space Experiment Research & Processing Laboratory (SERPL). The project is enabled by a partnership and collaboration between NASA and the State of Florida to create a vital resource for international and commercial space customers. SERPL is considered a magnet facility, and will support the development and processing of life sciences experiments destined for the International Space Station and accommodate NASA, industry and academic researchers performing associated biological research

  5. KSC-04pd0786

    NASA Image and Video Library

    2004-04-07

    KENNEDY SPACE CENTER, FLA. -- Florida Gov. Jeb Bush and his wife, Columba (right), wait outside the KSC Space Life Sciences (SLS) Lab for a tour. At left is Debra Holliday, director of Business Development and International Affairs, Florida Spaceport Authority. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Kennedy and included remarks by NASA Administrator Sean O’Keefe, Gov. Jeb Bush, U.S. Mint Director Henrietta Holsman Fore and Deputy Secretary of the Treasury Samuel W. Bodman. On the tour, Gov. Bush was accompanied by NASA Administrator Sean O’Keefe and Center Director Jim Kennedy and their wives.

  6. KSC-04PD-0786

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Florida Gov. Jeb Bush and his wife, Columba (right), wait outside the KSC Space Life Sciences (SLS) Lab for a tour. At left is Debra Holliday, director of Business Development and International Affairs, Florida Spaceport Authority. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Kennedy and included remarks by NASA Administrator Sean OKeefe, Gov. Jeb Bush, U.S. Mint Director Henrietta Holsman Fore and Deputy Secretary of the Treasury Samuel W. Bodman. On the tour, Gov. Bush was accompanied by NASA Administrator Sean OKeefe and Center Director Jim Kennedy and their wives.

  7. Energy Exchange NASA Opening Plenary

    NASA Technical Reports Server (NTRS)

    Marrs, Rick

    2017-01-01

    Rick Marrs, Deputy Assistant Administrator Office of Strategic Infrastructure NASA Headquarters will be speaking during the 2017 Energy Exchange opening plenary. His presentation showcases the NASA mission, sustainability at NASA, NASA's strategic Sustainability Performance Plan, Existing PV Partnerships, and NASA funded Solar Initiatives at KSC.

  8. A 10-GHz amplifier using an epitaxial lift-off pseudomorphic HEMT device

    NASA Technical Reports Server (NTRS)

    Young, Paul G.; Romanofsky, Robert R.; Alterovitz, Samuel A.; Mena, Rafael A.; Smith, Edwyn D.

    1993-01-01

    A process to integrate epitaxial lift-off devices and microstrip circuits has been demonstrated using a pseudomorphic HEMT on an alumina substrate. The circuit was a 10 GHz amplifier with the interconnection between the device and the microstrip circuit being made with photolithographically patterned metal. The measured and modeled response correlated extremely well with a maximum gain of 6.8 dB and a return loss of -14 dB at 10.4 GHz.

  9. Statistical Process Control for KSC Processing

    NASA Technical Reports Server (NTRS)

    Ford, Roger G.; Delgado, Hector; Tilley, Randy

    1996-01-01

    The 1996 Summer Faculty Fellowship Program and Kennedy Space Center (KSC) served as the basis for a research effort into statistical process control for KSC processing. The effort entailed several tasks and goals. The first was to develop a customized statistical process control (SPC) course for the Safety and Mission Assurance Trends Analysis Group. The actual teaching of this course took place over several weeks. In addition, an Internet version of the same course complete with animation and video excerpts from the course when it was taught at KSC was developed. The application of SPC to shuttle processing took up the rest of the summer research project. This effort entailed the evaluation of SPC use at KSC, both present and potential, due to the change in roles for NASA and the Single Flight Operations Contractor (SFOC). Individual consulting on SPC use was accomplished as well as an evaluation of SPC software for KSC use in the future. A final accomplishment of the orientation of the author to NASA changes, terminology, data format, and new NASA task definitions will allow future consultation when the needs arise.

  10. KSC-03pd1111

    NASA Image and Video Library

    2003-04-09

    KENNEDY SPACE CENTER, FLA. -- Jeff Angermeier, assigned to lead the ground operations at the Lufkin Command Center, points out a town near the Columbia debris field. KSC workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  11. KSC-04pd0930

    NASA Image and Video Library

    2004-03-31

    KENNEDY SPACE CENTER, FLA. - An aerial photo of the Space Life Sciences Lab at KSC. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA KSC and the State of Florida.

  12. KSC-04pd0931

    NASA Image and Video Library

    2004-03-31

    KENNEDY SPACE CENTER, FLA. - An aerial photo of the Space Life Sciences Lab at KSC. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA KSC and the State of Florida.

  13. KSC-04pd0932

    NASA Image and Video Library

    2004-03-31

    KENNEDY SPACE CENTER, FLA. - An aerial photo of the Space Life Sciences Lab at KSC. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA KSC and the State of Florida.

  14. KSC-06pd2220

    NASA Image and Video Library

    2006-09-26

    KENNEDY SPACE CENTER, FLA. - A ribbon-cutting at NASA's Kennedy Space Center officially reactivated the Operations and Checkout Building's west door as entry to the crew exploration vehicle (CEV) environment. At the podium is Center Director Jim Kennedy, who is discussing KSC's transition from shuttle to CEV in the rest of the decade. During the rest of the decade, KSC will transition from launching space shuttles to launching new vehicles in NASA’s Vision For Space Exploration. Photo credit: NASA/Kim Shiflett

  15. KSC-04pd1883

    NASA Image and Video Library

    2004-09-22

    KENNEDY SPACE CENTER, FLA. - Guest speaker Charles A. Gambaro, NASA KSC engineering lead and Combat Engineering Group commander, speaks to an appreciative audience during KSC’s annual Hispanic American Heritage luncheon. The theme was “Hispanic Americans Making a Difference.” Gambaro recently returned from Operation Iraqi Freedom. Hosted by the Hispanic Employment Program Working Group, the luncheon also provided live cultural entertainment. The annual event helps employees reflect on the extensive contributions Hispanics have made to KSC, NASA and the nation.

  16. KSC-06pd2077

    NASA Image and Video Library

    2006-09-08

    KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Steven MacLean dons his launch and re-entry suit before heading to the launch pad. MacLean is with the Canadian Space Agency. MacLean is making his second shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett

  17. KSC-2012-2128

    NASA Image and Video Library

    2012-04-14

    CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida, workers secure a sling to space shuttle Discovery to enable the mate-demate device to lift it onto a Shuttle Carrier Aircraft. The device, known as the MDD, is a large gantry-like steel structure used to hoist a shuttle off the ground and position it onto the back of the aircraft, or SCA. The SCA is a Boeing 747 jet, originally manufactured for commercial use, which was modified by NASA to transport the shuttles between destinations on Earth. The SCA designated NASA 905 is assigned to the remaining ferry missions, delivering the shuttles to their permanent public display sites. NASA 905 is scheduled to ferry Discovery to the Washington Dulles International Airport in Virginia on April 17, after which the shuttle will be placed on display in the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center. For more information on the SCA, visit http://www.nasa.gov/centers/dryden/news/FactSheets/FS-013-DFRC.html. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis

  18. KSC-2012-2129

    NASA Image and Video Library

    2012-04-14

    CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida, workers secure a sling to space shuttle Discovery to enable the mate-demate device to lift it onto a Shuttle Carrier Aircraft. The device, known as the MDD, is a large gantry-like steel structure used to hoist a shuttle off the ground and position it onto the back of the aircraft, or SCA. The SCA is a Boeing 747 jet, originally manufactured for commercial use, which was modified by NASA to transport the shuttles between destinations on Earth. The SCA designated NASA 905 is assigned to the remaining ferry missions, delivering the shuttles to their permanent public display sites. NASA 905 is scheduled to ferry Discovery to the Washington Dulles International Airport in Virginia on April 17, after which the shuttle will be placed on display in the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center. For more information on the SCA, visit http://www.nasa.gov/centers/dryden/news/FactSheets/FS-013-DFRC.html. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis

  19. KSC-04pd0644

    NASA Image and Video Library

    2004-03-26

    KENNEDY SPACE CENTER, FLA. -- An aerial photo of the recently completed Space Life Sciences Lab at KSC. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida.

  20. KSC-04pd0645

    NASA Image and Video Library

    2004-03-26

    KENNEDY SPACE CENTER, FLA. -- An aerial photo of the recently completed Space Life Sciences Lab at KSC. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida.

  1. KSC-04pd0646

    NASA Image and Video Library

    2004-03-26

    KENNEDY SPACE CENTER, FLA. -- An aerial photo of the recently completed Space Life Sciences Lab at KSC. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida.

  2. KSC-04pd0647

    NASA Image and Video Library

    2004-03-26

    KENNEDY SPACE CENTER, FLA. -- An aerial photo of the recently completed Space Life Sciences Lab at KSC. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida.

  3. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Exhibitors answer questions at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  4. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    An exhibitor answers questions at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  5. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Attendees visit exhibitor booths at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  6. KSC-03pd1108

    NASA Image and Video Library

    2003-04-10

    KENNEDY SPACE CENTER, FLA. -- Members of a Columbia Recovery search team take a break while walking a grid during a search near the Hemphill site. At center is NASA engineer Clay Thomlinson. The U.S. Forest Service group is accompanied by a space program worker able to identify potential hazards of Shuttle parts. Kennedy Space Center workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  7. KSC-04PD-0796

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- In the KSC Space Life Sciences Lab, NASA Administrator Sean OKeefe (far right) learns about some of the experiments being conducted. At far left is former astronaut Winston Scott; next to him is U.S. Mint Director Henrietta Holsman Fore. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Center Director Jim Kennedy and included remarks by OKeefe, Bush, Fore and Deputy Secretary of the Treasury Samuel W. Bodman.

  8. KSC-04pd0799

    NASA Image and Video Library

    2004-04-07

    KENNEDY SPACE CENTER, FLA. -- An aerial photo of the recently completed Space Life Sciences Lab at KSC. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The Lab was the site of a tour by Florida Gov. Jeb Bush, NASA Administrator Sean O’Keefe, Center Director Jim Kennedy, U.S. Mint Director Henrietta Holsman Fore and Deputy Secretary of the Treasury Samuel W. Bodman. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Kennedy and included remarks by O’Keefe, Bush, Fore and Bodman.

  9. KSC-07pd1291

    NASA Image and Video Library

    2007-05-25

    KENNEDY SPACE CENTER, FLA. -- NASA, Kennedy Space Center and State of Florida dignitaries helped launch the opening of the newest attraction at Kennedy Space Center's Visitor Complex, the Shuttle Launch Experience. Breaking the ribbon are (left to right) Dan LeBlanc, chief operating officer of the KSC Visitor Complex; Lt. Governor of Florida Jeff Kottkamp; former astronauts John Young and Bob Crippen; Center Director Bill Parsons; KSC Director of External Relations Lisa Malone; and former astronaut Buzz Aldrin. The attraction includes a simulated launch with the sights, sounds and sensations of launching into space. Find out more about the Visitor Complex and the Shuttle Launch Experience at http://www.kennedyspacecenter.com/visitKSC/attractions/index.asp. Photo credit: NASA/George Shelton

  10. KSC-07pd1290

    NASA Image and Video Library

    2007-05-25

    KENNEDY SPACE CENTER, FLA. -- NASA, Kennedy Space Center and State of Florida dignitaries helped launch the opening of the newest attraction at Kennedy Space Center's Visitor Complex, the Shuttle Launch Experience. Holding the ribbon for the breaking are (left to right) Dan LeBlanc, chief operating officer of the KSC Visitor Complex; Lt. Governor of Florida Jeff Kottkamp; former astronauts John Young and Bob Crippen; Center Director Bill Parsons; KSC Director of External Relations Lisa Malone; and former astronaut Buzz Aldrin. The attraction includes a simulated launch with the sights, sounds and sensations of launching into space. Find out more about the Visitor Complex and the Shuttle Launch Experience at http://www.kennedyspacecenter.com/visitKSC/attractions/index.asp. Photo credit: NASA/George Shelton

  11. KSC-04PD-0799

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- An aerial photo of the recently completed Space Life Sciences Lab at KSC. The new lab is a state- of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The Lab was the site of a tour by Florida Gov. Jeb Bush, NASA Administrator Sean OKeefe, Center Director Jim Kennedy, U.S. Mint Director Henrietta Holsman Fore and Deputy Secretary of the Treasury Samuel W. Bodman. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Kennedy and included remarks by OKeefe, Bush, Fore and Bodman.

  12. KSC-04PD-0793

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Neil Yorio, a Dynamac scientist (left) in the KSC Space Life Sciences (SLS) Lab, explains the function of the facility to Florida Gov. Jeb Bush and his wife, Columba. Bush and others were touring the Lab following the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. . The new lab is a state-of-the- art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The launching ceremony was emceed by Center Director Jim Kennedy and included remarks by NASA Administrator Sean OKeefe, Bush, U.S. Mint Director Henrietta Holsman Fore and Deputy Secretary of the Treasury Samuel W. Bodman.

  13. KSC-97PC1281

    NASA Image and Video Library

    1997-08-22

    KENNEDY SPACE CENTER, FLA. -- Following the presentation of the Universal Signal Conditioning Amplifier (USCA), a new piece of technology developed through a National Aeronautics and Space Administration (NASA) partnership with industry, to Kennedy Space Center (KSC) Director Roy Bridges, Jr., key participants in the partnership pose for a group portrait. They are (from left) Bill Larson, NASA; Dr. Pedro Medelius, INET; Roy Bridges, Jr., KSC Director; Ed Gladney and William Saputo, L-3 Communications; Pam Gillespi, representing Congressman Dave Weldon; and Frank Kinney, Technological Research and Development Authority. The USCA is a key component of the codeveloped Automated Data Acquisition System (ADAS) that measures temperature, pressure and vibration at KSC's launch pads. The breakthrough technology is expected to reduce sensor setup and configuration times from hours to seconds. KSC teamed up with Florida's Technological Research and Development Authority and manufacturer L-3 Communications to produce a system that would benefit the aerospace industry and other commercial markets

  14. Can Skateboarding Save the Planet? A Curricular Unit on Global Climate Change Developed Through the NASA LIFT-OFF Program

    NASA Astrophysics Data System (ADS)

    Pruett, L. E.; Burrell, S.; Chidester, C.; Metzger, E. P.

    2010-12-01

    The inclusion of global climate change education in California public high schools is constrained by several factors, including the planning time needed to effectively correlate state content standards to the multidisciplinary science of climate change, the lack of time in the curriculum, and budget constraints that limit resources for teachers. Recent efforts by the NASA LIFT-OFF program to support classroom teachers in the development of inquiry-based curricular materials have helped to alleviate many of these burdens. NASA LIFT-OFF is funded by a grant to the Alameda County Office of Education and involves a partnership between the Alameda, Santa Clara, and Los Angeles county offices of education and science faculty at California State University (CSU) East Bay, San Jose State University (SJSU), and Cal Poly Pomona. LIFT-OFF goals are to improve high school science teachers’ content knowledge through interactions with scientists from the CSU campuses, NASA, and the SETI Institute and to enhance their ability to plan and implement high-quality science inquiry in their classrooms. LIFT-OFF teachers at the three CSU campuses are developing instructional cases that use NASA resources and research-based pedagogical practices to explore engaging real-world questions. We participated in SJSU’s 2010 LIFT-OFF summer institute and worked as a team to develop a 12-day unit for high school students that focuses on the science behind global climate change. In addition to delivering science content, the unit engages students in critical thinking and evaluation. Students generate, access and interpret data, and use the knowledge gained to make small lifestyle changes that aid in the reduction of their greenhouse gas emissions. Not only does this unit of study empower students to make science-based decisions, it also incorporates diverse learning strategies, such as the use of visuals aids, language acquisition techniques to improve literacy, formative assessments and daily

  15. KSC-03pd0297

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. NASA Administrator Sean O'Keefe is at the podium. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  16. KSC-03pd0286

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests, including Florida Gov. Jeb Bush (second from right) and NASA Administrator Sean O'Keefe (right). The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  17. KSC-04pd2000

    NASA Image and Video Library

    2004-09-21

    KENNEDY SPACE CENTER, FLA. - KSC Deputy Director Dr. Woodrow Whitlow Jr. (left) talks with staff members of Gainesville Elementary School, a NASA Explorer School in Gainesville, Ga. In the background are Bruce Buckingham (left) , NASA KSC News Chief, and Jim Jennings, deputy associate administrator for Institutions and Asset Management at NASA Headquarters. Jennings shared the new vision for space exploration with this next generation of explorers. Whitlow talked with students about our destiny as explorers, NASA’s stepping stone approach to exploring Earth, the Moon, Mars and beyond, how space impacts our lives, and how people and machines rely on each other in space.

  18. KSC-04PD-0710

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- NASA-KSC representatives pose with two students in front of Oscar Patterson Elementary Magnet School in Panama City, Fla. From left are Pam Biegert (chief of KSCs Education Programs and University Research Office), astronaut Sam Durrance, Center Director Jim Kennedy, John Halsema (chief, Government Relations Office), Steve Lewis (assistant to Kennedy), and Mike Rein (division chief, Communications). NASA-KSC officials are visiting NASA Explorer Schools in Florida and Georgia to share Americas new vision for space exploration with the next generation of explorers. Kennedy is talking with students about our destiny as explorers, NASAs stepping stone approach to exploring Earth, the Moon, Mars and beyond, how space impacts our lives, and how people and machines rely on each other in space.

  19. KSC-07pd1738

    NASA Image and Video Library

    2007-07-03

    KENNEDY SPACE CENTER, FLA. -- After a three-day trip from California, the shuttle carrier aircraft, or SCA, and its piggyback passenger Atlantis are parked on the KSC Shuttle Landing Facility. Touchdown was at 8:27 a.m. EDT. The SCA is a modified Boeing 747 jetliner. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. Atlantis landed at Edwards Air Force Base in California to end mission STS-117. The return to KSC began July 1 and took three days after stops across the country for fuel. The last stop was at Ft. Campbell in Kentucky. Weather conditions over the last leg postponed the return trip until July 3. Atlantis will be removed from the back of the SCA via the mate/demate device at the SLF. It will then be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Photo credit: NASA/Ken Thornsley

  20. KSC00pp1030

    NASA Image and Video Library

    2000-07-22

    The railroad tracks are under repair at Kennedy Space Center. This section of track is located on KSC property, just north of the NASA Causeway in the KSC Industrial Area. The repairs were required following the minor derailment of two solid rocket booster segment cars on July 18

  1. KSC-00pp1031

    NASA Image and Video Library

    2000-07-27

    Railroad track repairs have been completed at Kennedy Space Center. This section of track is located on KSC property, just north of the NASA Causeway in the KSC Industrial Area. The repairs were required following the minor derailment of two solid rocket booster segment cars on July 18

  2. KSC-00pp1029

    NASA Image and Video Library

    2000-07-22

    The railroad tracks are under repair at Kennedy Space Center. This section of track is located on KSC property, just north of the NASA Causeway in the KSC Industrial Area. The repairs were required following the minor derailment of two solid rocket booster segment cars on July 18

  3. KSC-00pp1032

    NASA Image and Video Library

    2000-07-27

    Railroad track repairs have been completed at Kennedy Space Center. This section of track is located on KSC property, just north of the NASA Causeway in the KSC Industrial Area. The repairs were required following the minor derailment of two solid rocket booster segment cars on July 18

  4. KSC-00pp1030

    NASA Image and Video Library

    2000-07-22

    The railroad tracks are under repair at Kennedy Space Center. This section of track is located on KSC property, just north of the NASA Causeway in the KSC Industrial Area. The repairs were required following the minor derailment of two solid rocket booster segment cars on July 18

  5. KSC00pp1031

    NASA Image and Video Library

    2000-07-27

    Railroad track repairs have been completed at Kennedy Space Center. This section of track is located on KSC property, just north of the NASA Causeway in the KSC Industrial Area. The repairs were required following the minor derailment of two solid rocket booster segment cars on July 18

  6. KSC00pp1032

    NASA Image and Video Library

    2000-07-27

    Railroad track repairs have been completed at Kennedy Space Center. This section of track is located on KSC property, just north of the NASA Causeway in the KSC Industrial Area. The repairs were required following the minor derailment of two solid rocket booster segment cars on July 18

  7. KSC00pp1029

    NASA Image and Video Library

    2000-07-22

    The railroad tracks are under repair at Kennedy Space Center. This section of track is located on KSC property, just north of the NASA Causeway in the KSC Industrial Area. The repairs were required following the minor derailment of two solid rocket booster segment cars on July 18

  8. KSC-99pc0142

    NASA Image and Video Library

    1999-01-28

    The KSC-developed X-33 weight simulator (top), known as the "iron bird," is lifted to a vertical position at the X-33 launch site as part of launch equipment testing on Edwards Air Force Base, CA. The simulator matches the 75,000-pound weight and 63-foot height of the X-33 vehicle that will be using the launch equipment. KSC's Vehicle Positioning System (VPS) placed the simulator on the rotating launch platform prior to the rotation. The new VPS will dramatically reduce the amount of manual labor required to position a reusable launch vehicle for liftoff

  9. KSC-99pc0145

    NASA Image and Video Library

    1999-01-28

    The KSC-developed X-33 weight simulator (top, right), known as the "iron bird," is lifted to a vertical position at the X-33 launch site as part of launch equipment testing on Edwards Air Force Base, CA. The simulator matches the 75,000-pound weight and 63-foot height of the X-33 vehicle that will be using the launch equipment. KSC's Vehicle Positioning System (VPS) placed the simulator on the rotating launch platform prior to the rotation. The new VPS will dramatically reduce the amount of manual labor required to position a reusable launch vehicle for liftoff

  10. KSC-99pc0143

    NASA Image and Video Library

    1999-01-28

    As part of X-33 launch equipment testing at Edwards Air Force Base, CA, the KSC-developed X-33 weight simulator (top), known as the "iron bird," is lifted to a vertical position at the X-33 launch site. The simulator matches the 75,000-pound weight and 63-foot height of the X-33 vehicle that will be using the launch equipment. KSC's Vehicle Positioning System (VPS) placed the simulator on the rotating launch platform prior to the rotation. The new VPS will dramatically reduce the amount of manual labor required to position a reusable launch vehicle for liftoff

  11. KSC-03pd1112

    NASA Image and Video Library

    2003-04-09

    KENNEDY SPACE CENTER, FLA. -- Eric Baker, a United Space Alliance project engineer at Kennedy Space Center, (right) works at the Lufkin Command Center to track hazardous tank finds. KSC workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  12. KSC-03pd1103

    NASA Image and Video Library

    2003-04-10

    KENNEDY SPACE CENTER, FLA. -- Kennedy Space Center workers chat with Forest Service workers at the Hemphill site in East Texas before heading out to the field for grid searches. KSC workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  13. KSC-03PD-1103

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. -- Kennedy Space Center workers chat with Forest Service workers at the Hemphill site in East Texas before heading out to the field for grid searches. KSC workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  14. Modifications to the NASA SP-8072 Distributed Source Method II for Ares I Lift-off Environment Predictions

    NASA Technical Reports Server (NTRS)

    Haynes, Jared; Kenny, Jeremy

    2009-01-01

    Lift-off acoustic environments for NASA's Ares I - Crew Launch Vehicle are predicted using the second source distribution methodology described in the NASA SP-8072. Three modifications made to the model include a shorter core length approximation, a core termination procedure upon plume deflection, and a new set of directivity indices measured from static test firings of the Reusable Solid Rocket Motor (RSRM). The modified sound pressure level predictions increased more than 5 dB overall, and the peak levels shifted two third-octave bands higher in frequency.

  15. A Simple Method for High-Lift Propeller Conceptual Design

    NASA Technical Reports Server (NTRS)

    Patterson, Michael; Borer, Nick; German, Brian

    2016-01-01

    In this paper, we present a simple method for designing propellers that are placed upstream of the leading edge of a wing in order to augment lift. Because the primary purpose of these "high-lift propellers" is to increase lift rather than produce thrust, these props are best viewed as a form of high-lift device; consequently, they should be designed differently than traditional propellers. We present a theory that describes how these props can be designed to provide a relatively uniform axial velocity increase, which is hypothesized to be advantageous for lift augmentation based on a literature survey. Computational modeling indicates that such propellers can generate the same average induced axial velocity while consuming less power and producing less thrust than conventional propeller designs. For an example problem based on specifications for NASA's Scalable Convergent Electric Propulsion Technology and Operations Research (SCEPTOR) flight demonstrator, a propeller designed with the new method requires approximately 15% less power and produces approximately 11% less thrust than one designed for minimum induced loss. Higher-order modeling and/or wind tunnel testing are needed to verify the predicted performance.

  16. KSC-03pd0301

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. KSC Director and former astronaut Roy Bridges, Jr., is seated third from right. Florida Senator Bill Nelson, seated in the center (gold tie), also flew on Columbia in 1986 as a payload specialist on mission STS 61-C. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  17. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    John Murray, chief executive officer of the Canaveral Port Authority, welcomes participants to the Kennedy Space Center's 27th Business Opportunities Expo at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  18. KSC-02pd0659

    NASA Image and Video Library

    2002-05-14

    KENNEDY SPACE CENTER, FLA. -- Gregg Buckingham, with KSC's Center for Space Education, addresses participants in this year's NASA MarsPort Engineering Design Student Competition 2002 conference at the KSC Visitor Complex, organized by the Florida Space Grant Consortium. Students and faculty from the nation's universities converged at Kennedy for the MarsPort Competition, presenting papers on engineering trade studies to design optimal configurations for a MarsPort Deployable Greenhouse for operation on the surface of Mars. Judges in the competition were from KSC, Dynamac Corporation and Florida Institute of Technology. The winning team's innovative ideas will be used by NASA to evaluate and study other engineering trade concepts. Also featured at the opening ceremony were Dr. Sam Durrance, FSGC director and former astronaut, and Dr. Gary Stutte, plant scientist, Dynamac Corporation.

  19. KSC-04PD-0792

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Neil Yorio, a Dynamac scientist(left), explains the function of the KSC Space Life Sciences (SLS) Lab to a prestigious tour group: (from left) Florida Gov. Jeb Bush and his wife, Columba; NASA Administrator Sean OKeefe and his wife, Laura; and U.S. Mint Director Henrietta Holsman Fore. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Center Director Jim Kennedy and included remarks by OKeefe, Bush, Fore and Deputy Secretary of the Treasury Samuel W. Bodman.

  20. KSC-04PD-0794

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- A Dynamac worker (left) explains the function of the KSC Space Life Sciences (SLS) Lab to a prestigious tour group: in the center, Laura OKeefe and NASA Administrator Sean OKeefe; at right, Florida Gov. Jeb Bush flanked by his wife, Columba on the left and Bernadette Kennedy, wife of Center Director Jim Kennedy. The new lab is a state-of- the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed Kennedy and included remarks by OKeefe, Bush, U.S. Mint Director Henrietta Holsman Fore and Deputy Secretary of the Treasury Samuel W. Bodman.

  1. KSC-04PD-0788

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Following the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint, NASA Administrator Sean OKeefe (far left), Gov. Jeb Bush (center), U.S. Mint Director Henrietta Holsman Fore (center right) and Center Director Jim Kennedy (in front of Neil Yorio, a Dynamac scientist, at right) tour the KSC Space Life Sciences (SLS) Lab. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. Next to OKeefe is Bernadette Kennedy, wife of the Center Director. The launching ceremony was emceed by Kennedy and included remarks by OKeefe, Bush, Fore and Deputy Secretary of the Treasury Samuel W. Bodman.

  2. Chronology of KSC and KSC Related Events for 2012

    NASA Technical Reports Server (NTRS)

    Liston, Elaine E.

    2013-01-01

    This 2012 Chronology is published to describe and document KSC's role in NASA's progress. Materials for this Chronology were selected from a number of published sources. The document records KSC events of interest to historians and other researchers. Arrangement is by date of occurrence, though the source cited may be dated one or more days after the event. Materials were researched and compiled for publication by Archivist Elaine Liston.

  3. Chronology of KSC and KSC related events for 1992

    NASA Technical Reports Server (NTRS)

    Nail, Ken, Jr.

    1993-01-01

    This chronology is published to fulfill the requirements of KMI 2700.1 to describe and document KSC's role in NASA's progress. Materials for this chronology were selected from a number of published sources. The document records KSC events of interest to historians and other researchers. Arrangement is by date of occurrence, though the source cited may be dated one or more days after the event. An index is included.

  4. KSC-02pd0663

    NASA Image and Video Library

    2002-05-14

    KENNEDY SPACE CENTER, FLA. -- A presentation by Franklin W. Olin College of Engineering is on display at the KSC Visitor Complex for this year's NASA MarsPort Engineering Design Student Competition 2002 conference. Participants are presenting papers on engineering trade studies to design optimal configurations for a MarsPort Deployable Greenhouse for operation on the surface of Mars. Judges in the competition were from KSC, Dynamac Corporation and Florida Institute of Technology. The winning team's innovative ideas will be used by NASA to evaluate and study other engineering trade concepts

  5. KSC-03pd0280

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - Employees at KSC gather at the Shuttle Landing Facility for a Columbia Crew Memorial Service. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  6. KSC-06pd2134

    NASA Image and Video Library

    2006-09-09

    KENNEDY SPACE CENTER, FLA. - Inside the Launch Control Center, KSC officials turn from their computers to watch through the broad windows the launch of Space Shuttle Atlantis on mission STS-115. Second from left is NASA Test Director Pete Nickolenko. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. sts-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett

  7. KSC-04pd1881

    NASA Image and Video Library

    2004-09-22

    KENNEDY SPACE CENTER, FLA. - Felix A. Soto Toro (left) and Joseph Tellado (right) get into the spirit of KSC’s annual Hispanic American Heritage luncheon. The theme was “Hispanic Americans Making a Difference.” Soto Toro and Tellado are co-chairs of the event hosted by the Hispanic Employment Program Working Group. The annual event helps employees reflect on the extensive contributions Hispanics have made to KSC, NASA and the nation. The guest speaker was Charles A. Gambaro, NASA KSC engineering lead and Combat Engineering Group commander, who recently returned from Operation Iraqi Freedom.

  8. KSC-07pd1287

    NASA Image and Video Library

    2007-05-25

    KENNEDY SPACE CENTER, FLA. -- NASA, Kennedy Space Center and State of Florida dignitaries helped launch the opening of the newest attraction at Kennedy Space Center's Visitor Complex, the Shuttle Launch Experience. Walking through the crowd is former astronaut Roy Bridges, who also is a former center director of KSC. The attraction includes a simulated launch with the sights, sounds and sensations of launching into space. Find out more about the Visitor Complex and the Shuttle Launch Experience at http://www.kennedyspacecenter.com/visitKSC/attractions/index.asp. Photo credit: NASA/George Shelton

  9. KSC-04PD-1881

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Felix A. Soto Toro (left) and Joseph Tellado (right) get into the spirit of KSCs annual Hispanic American Heritage luncheon. The theme was Hispanic Americans Making a Difference. Soto Toro and Tellado are co-chairs of the event hosted by the Hispanic Employment Program Working Group. The annual event helps employees reflect on the extensive contributions Hispanics have made to KSC, NASA and the nation. The guest speaker was Charles A. Gambaro, NASA KSC engineering lead and Combat Engineering Group commander, who recently returned from Operation Iraqi Freedom.

  10. KSC-99pp1480

    NASA Image and Video Library

    1999-12-19

    KENNEDY SPACE CENTER, FLA. -- STS-103 Commander Curtis L. Brown Jr., in his orange launch and entry suit, enjoys a laugh with closeout crew members in the White Room before entering the orbiter. From left are United Space Alliance (USA) Mechanical Technician Rene Arriens, USA Orbiter Vehicle Closeout Chief Travis Thompson, and NASA Quality Assurance Specialist Danny Wyatt. The white room is an environmental chamber at the end of the orbiter access arm on the fixed service structure. It provides entry to the orbiter crew compartment. The mission, to service the Hubble Space Telescope, is scheduled to lift off at 7:50 p.m. EST Dec. 19 on mission STS-103, servicing the Hubble Space Telescope. Objectives for the nearly eight-day mission include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. Discovery is expected to land at KSC Monday, Dec. 27, at about 5:24 p.m. EST

  11. KSC01padig280

    NASA Image and Video Library

    2001-09-29

    KODIAK ISLAND, Alaska -- A Lockheed Martin Athena I launch vehicle lifts off the launch pad at Kodiak Launch Complex (KSC) with the Kodiak Star spacecraft on board. Liftoff occurred at 10:40 p.m. EDT, Sept. 29. The Kodiak Star payload consists of four satellites: PICOSat, PCSat, Sapphire and Starshine 3. Starshine is sponsored by NASA. The 200-pound sphere will be used by students to study orbital decay. The other three satellites, also on educational missions, are sponsored by the department of defense. PICOSat is a technology demonstration satellite with four experiments on board. PCSat was designed by midshipmen at the U.S. Naval Academy, and will become part of the amateur radio community's automatic position reporting system. Sapphire is a micro-satellite built by students at Stanford University and Washington University - St. Louis to test infrared sensors for space use. KLC is the newest commercial launch complex in the United States, ideal for launch payloads requiring low-Earth polar or sun-synchronous orbits

  12. STS-65 Columbia, OV-102, lifts off from KSC Launch Complex (LC) Pad 39A

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Columbia, Orbiter Vehicle (OV) 102, atop its external tank (ET) rises above the Kennedy Space Center (KSC) Launch Complex (LC) Pad 39A after liftoff at 12:43 pm Eastern Daylight Time (EDT). OV-102 starboard side and one of the two solid rocket boosters (SRBs) are visible in this launch view. The retracted rotating service structure (RSS) is nearly covered in the shuttle's exhaust at the left as OV-102 clears the fixed service structure (FSS) tower. The space shuttle main engines produce a diamond shock effect. Once in orbit, STS-65's six NASA astronauts and a Japanese Payload Specialist will begin two weeks of experimentation in support of the second International Microgravity Laboratory (IML-2) mission.

  13. Experiments on the flow field physics of confluent boundary layers for high-lift systems

    NASA Technical Reports Server (NTRS)

    Nelson, Robert C.; Thomas, F. O.; Chu, H. C.

    1994-01-01

    The use of sub-scale wind tunnel test data to predict the behavior of commercial transport high lift systems at in-flight Reynolds number is limited by the so-called 'inverse Reynolds number effect'. This involves an actual deterioration in the performance of a high lift device with increasing Reynolds number. A lack of understanding of the relevant flow field physics associated with numerous complicated viscous flow interactions that characterize flow over high-lift devices prohibits computational fluid dynamics from addressing Reynolds number effects. Clearly there is a need for research that has as its objective the clarification of the fundamental flow field physics associated with viscous effects in high lift systems. In this investigation, a detailed experimental investigation is being performed to study the interaction between the slat wake and the boundary layer on the primary airfoil which is known as a confluent boundary layer. This little-studied aspect of the multi-element airfoil problem deserves special attention due to its importance in the lift augmentation process. The goal of this research is is to provide an improved understanding of the flow physics associated with high lift generation. This process report will discuss the status of the research being conducted at the Hessert Center for Aerospace Research at the University of Notre Dame. The research is sponsored by NASA Ames Research Center under NASA grant NAG2-905. The report will include a discussion of the models that have been built or that are under construction, a description of the planned experiments, a description of a flow visualization apparatus that has been developed for generating colored smoke for confluent boundary layer studies and some preliminary measurements made using our new 3-component fiber optic LDV system.

  14. KSC-03pd0296

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. NASA Associate Deputy Administrator for Institutions and Asset Management James L. Jennings is at the podium. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  15. Lift producing device exhibiting low drag and reduced ventilation potential and method for producing the same

    NASA Technical Reports Server (NTRS)

    Caldwell, Richard A. (Inventor)

    1991-01-01

    A lift producing device is disclosed which is adapted to be connected to a vehicle to provide lift to the vehicle when the vehicle is moved relative to a first fluid medium having a first density and viscosity and being in contact with a second fluid medium adjacent the vehicle. The second fluid medium has a second fluid density which is different from the first fluid density. The lift producing device comprises opposed first and second major surfaces joined at a longitudinally extending leading edge and at a longitudinally extending trailing edge, with at least a portion of the longitudinally extending leading edge being spaced from the longitudinally extending trailing edge by a predetermined mean chord length. When the vehicle is moved relative to the first fluid medium at a velocity within a range of predetermined velocities, with each of the velocities having a direction inclined from a plane extending through the leading edge and the trailing edge within a predetermined angular range, a region of high pressure is generated in the first fluid medium adjacent the first major surface and a region of low pressure is generated in the first fluid medium adjacent the second major surface. The lift producing device has a cross-sectional shape which will generate a pressure distribution around the device when the vehicle is moved relative to the first fluid medium at a velocity within the range of predetermined velocities such that the first fluid medium exhibits attached laminar flow along the device for a portion of the predetermined mean chord length from the leading edge to the trailing edge and will neither form a laminar separation bubble adjacent the second major surface of the device, nor exhibit turbulent separation adjacent the second major surface for substantially all of the predetermined mean chord length from the leading edge to the trailing edge. The portion along which attached laminar flow is maintained is the longest portion which will still fulfill

  16. KSC-03PD-1101

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. -- Lisa DeVries uses a sensor to test a piece of Columbia at the Barksdale Hangar for toxic fumes. DeVries, on assignment at Barksdale, La., works with United Space Alliance Safety at Kennedy Space Center. KSC workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., Hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  17. KSC-03pd1113

    NASA Image and Video Library

    2003-04-09

    KENNEDY SPACE CENTER, FLA. -- Kennedy Space Center and Forest Service workers pose in front of a helicopter landed at the Nacogdoches field site. The helicopter is one of those being used to survey for parts of Columbia. KSC workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  18. KSC-03pd1101

    NASA Image and Video Library

    2003-04-10

    KENNEDY SPACE CENTER, FLA. -- Lisa DeVries uses a sensor to test a piece of Columbia at the Barksdale Hangar for toxic fumes. DeVries, on assignment at Barksdale, La., works with United Space Alliance Safety at Kennedy Space Center. KSC workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., Hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  19. KSC-98pc419

    NASA Image and Video Library

    1998-03-25

    KENNEDY SPACE CENTER, FLA. -- John F. Kennedy Jr., editor-in-chief of George Magazine, greets invited guests at the Home Box Office (HBO) and Imagine Entertainment premiere of the 12-part miniseries "From the Earth to the Moon" at Kennedy Space Center (KSC). The series was filmed in part on location at KSC and dramatizes the human aspects of NASA's efforts to launch Americans to the Moon. The miniseries highlights NASA's Apollo program and the events leading up to and including the six successful missions to the Moon. A special 500-seat theater was constructed next to the Apollo/Saturn V Center for the KSC premiere showing. Speakers at the event included KSC Director Roy Bridges (at right); Jeff Bewkes, chairman and CEO for HBO; and John F. Kennedy Jr. Also attending the event, which featured the episode entitled "1968," were Buzz Aldrin, Apollo 11 astronaut, and Al Worden, Apollo 15 astronaut. The original miniseries event, created for HBO by actor Tom Hanks and Imagine Entertainment, will premiere on HBO beginning April 5, 1998

  20. KSC-98pc420

    NASA Image and Video Library

    1998-03-25

    KENNEDY SPACE CENTER, FLA. -- John F. Kennedy Jr., editor-in-chief of George Magazine, speaks with members of the national media at the Home Box Office (HBO) and Imagine Entertainment premiere of the 12-part miniseries "From the Earth to the Moon" at Kennedy Space Center (KSC). The series was filmed in part on location at KSC and dramatizes the human aspects of NASA's efforts to launch Americans to the Moon. The miniseries highlights NASA's Apollo program and the events leading up to and including the six successful missions to the Moon. A special 500-seat theater was constructed next to the Apollo/Saturn V Center for the KSC premiere showing. Speakers at the event included KSC Director Roy Bridges (at right); Jeff Bewkes, chairman and CEO for HBO; and John F. Kennedy Jr. Also attending the event, which featured the episode entitled "1968," were Buzz Aldrin, Apollo 11 astronaut, and Al Worden, Apollo 15 astronaut. The original miniseries event, created for HBO by actor Tom Hanks and Imagine Entertainment, will premiere on HBO beginning April 5, 1998

  1. Launching the Future... Constellation Program at KSC

    NASA Technical Reports Server (NTRS)

    Denson, Erik C.

    2010-01-01

    With the Constellation Program, NASA is entering a new age of space exploration that will take us back to the Moon, to Mars, and beyond, and NASA is developing the new technology and vehicles to take us there. At the forefront are the Orion spacecraft and the Ares I launch vehicle. As NASA's gateway to space, Kennedy Space Center (KSC) will process and launch the new vehicles. This will require new systems and extensive changes to existing infrastructure. KSC is designing a new mobile launcher, a new launch control system, and new ground support equipment; modifying the Vehicle Assembly Building, one of the launch pads, and other facilities; and launching the Ares I-X flight test. It is an exciting and challenging time to be an engineer at KSC.

  2. KSC-2012-2127

    NASA Image and Video Library

    2012-04-14

    CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida, workers secure a sling to space shuttle Discovery for its lift onto the top of a Shuttle Carrier Aircraft with the aid of the mate-demate device. The device, known as the MDD, is a large gantry-like steel structure used to hoist a shuttle off the ground and position it onto the back of the aircraft, or SCA. The SCA is a Boeing 747 jet, originally manufactured for commercial use, which was modified by NASA to transport the shuttles between destinations on Earth. The SCA designated NASA 905 is assigned to the remaining ferry missions, delivering the shuttles to their permanent public display sites. NASA 905 is scheduled to ferry Discovery to the Washington Dulles International Airport in Virginia on April 17, after which the shuttle will be placed on display in the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center. For more information on the SCA, visit http://www.nasa.gov/centers/dryden/news/FactSheets/FS-013-DFRC.html. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis

  3. KSC-2012-2126

    NASA Image and Video Library

    2012-04-14

    CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida, workers secure a sling to space shuttle Discovery in order to lift it onto the top of a Shuttle Carrier Aircraft with the aid of the mate-demate device. The device, known as the MDD, is a large gantry-like steel structure used to hoist a shuttle off the ground and position it onto the back of the aircraft, or SCA. The SCA is a Boeing 747 jet, originally manufactured for commercial use, which was modified by NASA to transport the shuttles between destinations on Earth. The SCA designated NASA 905 is assigned to the remaining ferry missions, delivering the shuttles to their permanent public display sites. NASA 905 is scheduled to ferry Discovery to the Washington Dulles International Airport in Virginia on April 17, after which the shuttle will be placed on display in the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center. For more information on the SCA, visit http://www.nasa.gov/centers/dryden/news/FactSheets/FS-013-DFRC.html. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis

  4. KSC-99pp1272

    NASA Image and Video Library

    1999-11-01

    Two of KSC's X-34 technicians (far right), David Rowell and Roger Cartier, look at work being done on the modified A-1A at Dryden Flight Research Center, Calif. Since September, eight NASA engineering technicians from KSC's Engineering Prototype Lab have assisted Orbital Sciences Corporation and NASA's Dryden Flight Research Center in the complex process of converting the X-34 A-1 vehicle from captive carry status to unpowered flight status, the A-1A. The other KSC technicians are Kevin Boughner, Mike Dininny, Mike Lane, Jerry Moscoso, James Niehoff Jr. and Bryan Taylor. The X-34 is 58.3 feet long, 27.7 feet wide from wing tip to wing tip, and 11.5 feet tall from the bottom of the fuselage to the top of the tail. The autonomously operated technology demonstrator will be air-launched from an L-1011 airplane and should be capable of flying eight times the speed of sound, reaching an altitude of 250,000 feet. The X-34 Project is managed by NASA's Marshall Space Flight Center in Huntsville, Ala

  5. KSC-04pd0795

    NASA Image and Video Library

    2004-04-07

    KENNEDY SPACE CENTER, FLA. -- On a tour of the KSC Space Life Sciences Lab, Florida Gov. Jeb Bush and NASA Administrator Sean O’Keefe (at left) listen to Rob Ferl (right), assistant director of the Bio Technology Program, University of Florida (one of the five partners in the SLS Lab). Second from right is U.S. Mint Director Henrietta Holsman Fore. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Center Director Jim Kennedy and included remarks by O’Keefe, Bush, Fore and Deputy Secretary of the Treasury Samuel W. Bodman.

  6. KSC-02pd0658

    NASA Image and Video Library

    2002-05-14

    KENNEDY SPACE CENTER, FLA. -- JoAnn H. Morgan, director of External Relations and Business Development at KSC, welcomes participants in this year's NASA MarsPort Engineering Design Student Competition 2002 conference at the KSC Visitor Complex, organized by the Florida Space Grant Consortium. Students and faculty from the nation's universities converged at Kennedy for the MarsPort Competition, presenting papers on engineering trade studies to design optimal configurations for a MarsPort Deployable Greenhouse for operation on the surface of Mars. Judges in the competition were from KSC, Dynamac Corporation and Florida Institute of Technology. The winning team's innovative ideas will be used by NASA to evaluate and study other engineering trade concepts. Also featured at the opening ceremony were Dr. Sam Durrance, FSGC director and former astronaut, and Dr. Gary Stutte, plant scientist, Dynamac Corporation.

  7. KSC-04PD-0791

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Neil Yorio, a Dynamac scientist(left), explains the function of the KSC Space Life Sciences (SLS) Lab to a prestigious tour group: Florida Gov. Jeb Bush, left of center, and NASA Administrator Sean OKeefe, and his wife, Laura, at right. Others in the group included former astronaut Winston Scott, U.S. Mint Director Henrietta Holsman Fore, and Center Director Jim Kennedy. The new lab is a state-of- the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Kennedy and included remarks by OKeefe, Bush, Fore and Deputy Secretary of the Treasury Samuel W. Bodman.

  8. KSC-04PD-0795

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- On a tour of the KSC Space Life Sciences Lab, Florida Gov. Jeb Bush and NASA Administrator Sean OKeefe (at left) listen to Rob Ferl (right), assistant director of the Bio Technology Program, University of Florida (one of the five partners in the SLS Lab). Second from right is U.S. Mint Director Henrietta Holsman Fore. The new lab is a state-of-the- art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Center Director Jim Kennedy and included remarks by OKeefe, Bush, Fore and Deputy Secretary of the Treasury Samuel W. Bodman.

  9. KSC-2012-1371

    NASA Image and Video Library

    2012-02-16

    VANDENBERG AIR FORCE BASE, Calif. -- Inside Orbital Sciences' processing facility at Vandenberg Air Force Base in California, a lifting device is lowered toward NASA's NuSTAR spacecraft. The spacecraft will be rotated to horizontal for joining with the Pegasus XL rocket. The Orbital Sciences Pegasus will launch NASA's Nuclear Spectroscopic Telescope Array NuSTAR into space. After the rocket and spacecraft are processed at Vandenberg, they will be flown on Orbital's L-1011 carrier aircraft to the Ronald Reagan Ballistic Missile Defense Test Site at the Pacific Ocean’s Kwajalein Atoll for launch. The high-energy x-ray telescope will conduct a census for black holes, map radioactive material in young supernovae remnants, and study the origins of cosmic rays and the extreme physics around collapsed stars. For more information, visit science.nasa.gov/missions/nustar/. Photo credit: NASA/Randy Beaudoin, VAFB

  10. KSC-04PD-1102

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- During filming at KSC by a crew from India, KSC videographer Glen Mic Miracle (left) and Bobbie Faye Ferguson talk to actor Rahul Vohra (right). The film crew spent several days at KSC filming at various sites for the movie Swades, a story about Indias brain-drain. Vohra is one of the actors in the film that stars Shahrukh Khan and Gayatri Joshi. The writer-director is Ashutosh Gowariker. Sunita Gowariker is executive producer. Ferguson is manager of Multimedia, for NASA Public Affairs.

  11. KSC-03pd0294

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  12. KSC-03pd0290

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  13. KSC-03pd0306

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  14. KSC-03pd0295

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  15. KSC-03pd0293

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  16. KSC-03pd0302

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  17. KSC-03pd0282

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  18. KSC-03pd0315

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft, seen here. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base.

  19. KSC-03pd0292

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  20. KSC-03pd0303

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  1. KSC-03pd0308

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  2. KSC-03pd0281

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  3. KSC-03pd0309

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. At the podium is astronaut Jim Halsell. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Also taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  4. KSC-03pd0291

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  5. KSC-03pd0313

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft, seen here. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base.

  6. KSC-03pd0314

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft, seen here. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base.

  7. KSC-04pd1879

    NASA Image and Video Library

    2004-09-22

    KENNEDY SPACE CENTER, FLA. - Astronaut Fernando Caldeiro (left) and Joseph Tellado (right) present a memento of appreciation to Charles A. Gambaro (center), NASA KSC engineering lead and Combat Engineering Group commander, who recently returned from Operation Iraqi Freedom. Gambaro was the guest speaker at KSC’s annual Hispanic American Heritage luncheon. The theme was “Hispanic Americans Making a Difference.” Caldeiro was born in Buenos Aires, Argentina. Tellado was co-chair of the event hosted by the Hispanic Employment Program Working Group. The annual event helps employees reflect on the extensive contributions Hispanics have made to KSC, NASA and the nation.

  8. KSC-04PD-1879

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Astronaut Fernando Caldeiro (left) and Joseph Tellado (right) present a memento of appreciation to Charles A. Gambaro (center), NASA KSC engineering lead and Combat Engineering Group commander, who recently returned from Operation Iraqi Freedom. Gambaro was the guest speaker at KSCs annual Hispanic American Heritage luncheon. The theme was Hispanic Americans Making a Difference. Caldeiro was born in Buenos Aires, Argentina. Tellado was co-chair of the event hosted by the Hispanic Employment Program Working Group. The annual event helps employees reflect on the extensive contributions Hispanics have made to KSC, NASA and the nation.

  9. Industrial Engineering Lifts Off at Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Barth, Tim

    1998-01-01

    When the National Aeronautics and Space Administration (NASA) began the Space Shuttle Program, it did not have an established industrial engineering (IE) capability for several probable reasons. For example, it was easy for some managers to dismiss IE principles as being inapplicable at NASA's John F. Kennedy Space Center (KSC). When NASA was formed by the National Aeronautics and Space Act of 1958, most industrial engineers worked in more traditional factory environments. The primary emphasis early in the shuttle program, and during previous human space flight programs such as Mercury and Apollo, was on technical accomplishments. Industrial engineering is sometimes difficult to explain in NASA's highly technical culture. IE is different in many ways from other engineering disciplines because it is devoted to process management and improvement, rather than product design. Images of clipboards and stopwatches still come to the minds of many people when the term industrial engineering is mentioned. The discipline of IE has only recently begun to gain acceptance and understanding in NASA. From an IE perspective today, the facilities used for flight hardware processing at KSC are NASA's premier factories. The products of these factories are among the most spectacular in the world: safe and successful launches of shuttles and expendable vehicles that carry tremendous payloads into space.

  10. KSC-2011-6689

    NASA Image and Video Library

    2011-07-12

    CAPE CANAVERAL, Fla. -- In the high bay of the Payload Hazardous Servicing Facility (PHSF) at NASA's Kennedy Space Center in Florida, spacecraft technicians from NASA's Jet Propulsion Laboratory attach guide ropes to the turning fixture connected to the multi-mission radioisotope thermoelectric generator (MMRTG) for NASA's Mars Science Laboratory (MSL) mission during preparations to lift it from its support base. The turning fixture will lift and lower the MMRTG onto the MMRTG integration cart. The cart will be used to install the MMRTG on Curiosity for a fit check. The MMRTG will be installed on the rover for launch at the pad. The MMRTG will generate the power needed for the mission from the natural decay of plutonium-238, a non-weapons-grade form of the radioisotope. Heat given off by this natural decay will provide constant power through the day and night during all seasons. Curiosity, MSL's car-sized rover, has 10 science instruments designed to search for signs of life, including methane, and help determine if the gas is from a biological or geological source. Waste heat from the MMRTG will be circulated throughout the rover system to keep instruments, computers, mechanical devices and communications systems within their operating temperature ranges. Launch of MSL aboard a United Launch Alliance Atlas V rocket is planned for Nov. 25 from Space Launch Complex 41 on Cape Canaveral Air Force Station. For more information, visit http://www.nasa.gov/msl. Photo credit: NASA/Cory Huston

  11. KSC Center Director Bridges accepts an ISO 9001 certificate from DNV

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Center Director Roy Bridges displays the ISO 9001 certificate he was awarded by Det Norske Veritas (DNV), Inc., an international ISO certification organization, at a ceremony at KSC. Dalton Lyon of DNV made the presentation, which included a 2000th ISO Certificate Plaque. ISO 9001 comprises the most detailed, comprehensive set of standard requirements for quality programs established by the International Standards Organization. The presentation followed a successful independent audit by DNV of the KSC Management System in May of this year. The third-party auditors examined about 20 elements of KSC's system, including management responsibility, design control, documentation, test and inspection, and corrective action procedures. DNV found that KSC met or exceeded the stringent quality standards in all areas. KSC will use this certification as a tool to improve an already world-class team. All NASA centers are required by NASA Administrator Daniel S. Goldin to be ISO 9001 registered by September 1999. NASA is the first federal agency to seek the quality certification.

  12. KSC-05PD-1751

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. In the stands at NASA Kennedy Space Centers Banana Creek viewing site, First Lady Laura Bush (center) watches Launch Pad 39B for the liftoff of Space Shuttle Discovery on Return to Flight mission STS-114, scheduled to lift off at 10:39 a.m. EDT. She is flanked by astronaut Scott Altmann at left and Florida Gov. Jeb Bush at right. In front of her are Michael OBrien (left), assistant administrator for External Relations, and Woodrow Whitlow Jr. (right), KSC deputy director. Mrs. Bush is only the third First Lady to witness a Space Shuttle launch at KSC. On this mission to the International Space Station the crew will perform inspections on-orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure. The 12-day mission is expected to end with touchdown at the Shuttle Landing Facility on Aug. 7.

  13. KSC-03pd1109

    NASA Image and Video Library

    2003-04-10

    KENNEDY SPACE CENTER, FLA. -- A memorial erected by the Hemphill, Texas, community commemorates a location where remains of a fallen Columbia astronaut were found. Kennedy Space Center workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  14. KSC-04pd1102

    NASA Image and Video Library

    2004-05-05

    KENNEDY SPACE CENTER, FLA. -- During filming at KSC by a crew from India, KSC videographer Glen “Mic” Miracle (left) and Bobbie Faye Ferguson talk to actor Rahul Vohra (right). The film crew spent several days at KSC filming at various sites for the movie “Swades,” a story about India’s brain-drain. Vohra is one of the actors in the film that stars Shahrukh Khan and Gayatri Joshi. The writer-director is Ashutosh Gowariker. Sunita Gowariker is executive producer. Ferguson is manager of Multimedia, for NASA Public Affairs.

  15. KSC Aerial Photos SI

    NASA Image and Video Library

    2016-11-28

    KSC Aerial Photos; 00;00;12;00-00;00;28;50 VAB 00;00;28;50 -00;02;11;55 Pad 39B 00;02;11;55 -00;02;31;13 Sand Dunes/Beach 00;02;31;13-00;03;41;33 Pad 39A SpaceX 00;03;41;33-00;04;41;45 LC-41 ULA 00;04;41;45-00;05;54;40 NASA KSC Headquarters 00;05;54;40-00;07;18;00 KSC Industrial Area; Center Contact - Gregory B. Harland (321) 867-2468

  16. KSC01padig112

    NASA Image and Video Library

    2001-03-02

    Robots, controlled by student teams, vie for points on the playing field during the NASA/KSC FIRST Southeastern Regional event held March 1-3, 2001. Three are KSC joint-sponsored teams: numbers 493, 386 and 168. FIRST (For Inspiration and Recognition of Science and Technology) events are held nationwide, pitting robots against each other and the clock on a playing field. Many teams are sponsored by corporations and academic institutions. There are 27 teams throughout the State of Florida who are competing. KSC, which sponsors nine teams, has held the regional event for two years

  17. KSC-108-75P-0057

    NASA Image and Video Library

    1975-02-10

    CAPE CANAVERAL, Fla. – The Soviet and American crews for the July Apollo Soyuz Test Project [standing, center] addressed personnel assembled in a firing room at KSC on February 10. The crews for the joint manned space mission toured the Center during their three-day visit which also included inspection of ASTP equipment and facilities and a trip to Disney World. The first international crewed spaceflight was a joint U.S.-U.S.S.R. rendezvous and docking mission. The Apollo-Soyuz Test Project, or ASTP, took its name from the spacecraft employed: the American Apollo and the Soviet Soyuz. The three-man Apollo crew lifted off from Kennedy Space Center aboard a Saturn IB rocket on July 15, 1975, to link up with the Soyuz that had launched a few hours earlier. A cylindrical docking module served as an airlock between the two spacecraft for transfer of the crew members. Photo credit: NASA

  18. KSC-2011-6560

    NASA Image and Video Library

    2011-07-21

    VANDENBERG AIR FORCE BASE, Calif. -- At NASA's Space Launch Complex-2 on Vandenberg Air Force Base in California, spacecraft technicians prepare to attach the interstage of the United Launch Alliance Delta II that will carry NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite into space to a lifting device. The interstage provides an interface between the launch vehicle's first and second stages. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS) to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB, Rudy Bledsoe

  19. KSC-04PD-0789

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Neil Yorio, a Dynamac scientist (right), explains the function of the KSC Space Life Sciences (SLS) Lab to a prestigious tour group. From left are NASA Administrator Sean OKeefe and his wife, Laura; Florida Gov. Jeb Bush; Bernadette Kennedy, wife of the Center Director (CD); Columba Bush, wife of the governor; behind Mrs. Bush, former astronaut Winston Scott; and third from right, CD Jim Kennedy. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Kennedy and included remarks by OKeefe, Bush, U.S. Mint Director Henrietta Holsman Fore and Deputy Secretary of the Treasury Samuel W. Bodman.

  20. KSC Center Director Bridges accepts an ISO 9001 certification plaque from DNV

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Center Director Roy Bridges (right) displays the 2000th ISO Certificate Plaque he was given by Dalton Lyon (left) of Det Norske Veritas (DNV), Inc., an international ISO certification organization, at a ceremony at KSC. The plaque is a representation of the ISO 9001 certification awarded to KSC by DNV. ISO 9001 comprises the most detailed, comprehensive set of standard requirements for quality programs established by the International Standards Organization. The presentation followed a successful independent audit by DNV of the KSC Management System in May of this year. The third-party auditors examined about 20 elements of KSC's system, including management responsibility, design control, documentation, test and inspection, and corrective action procedures. DNV found that KSC met or exceeded the stringent quality standards in all areas. KSC will use this certification as a tool to improve an already world- class team. All NASA centers are required by NASA Administrator Daniel S. Goldin to be ISO 9001 registered by September 1999. NASA is the first federal agency to seek the quality certification.

  1. A New Lift for Those Who Need It

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The eZ-uP device was designed by NASA engineer, Paul Neal, who worked with Kennedy Space Center. He took his idea to RJDesigns & Associates. With refinements, they developed a lightweight aluminium structure to assist the elderly in lifting themselves from seated positions. It can support people in excess of 500 pounds and is quickly assembled without tools. It is completely adjustable to fit under most sofas, chairs, and beds and will not slip on wood or tile floors. Also, it is relatively inexpensive compared to other products on the market. The apparatus is placed under the seat and adjusted so that the hand supports are in front of the person just under shoulder level. The seated person then takes hold and easily lifts himself from the seat. Product still commercially available as of March 2002.

  2. 21 CFR 880.5500 - AC-powered patient lift.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false AC-powered patient lift. 880.5500 Section 880.5500... Devices § 880.5500 AC-powered patient lift. (a) Identification. An AC-powered lift is an electrically powered device either fixed or mobile, used to lift and transport patients in the horizontal or other...

  3. 21 CFR 880.5500 - AC-powered patient lift.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false AC-powered patient lift. 880.5500 Section 880.5500... Devices § 880.5500 AC-powered patient lift. (a) Identification. An AC-powered lift is an electrically powered device either fixed or mobile, used to lift and transport patients in the horizontal or other...

  4. NASA, Engineering, and Swarming Robots

    NASA Technical Reports Server (NTRS)

    Leucht, Kurt

    2015-01-01

    This presentation is an introduction to NASA, to science and engineering, to biologically inspired robotics, and to the Swarmie ant-inspired robot project at KSC. This presentation is geared towards elementary school students, middle school students, and also high school students. This presentation is suitable for use in STEM (science, technology, engineering, and math) outreach events. The first use of this presentation will be on Oct 28, 2015 at Madison Middle School in Titusville, Florida where the author has been asked by the NASA-KSC Speakers Bureau to speak to the students about the Swarmie robots.

  5. Experimental study of delta wing leading-edge devices for drag reduction at high lift

    NASA Technical Reports Server (NTRS)

    Johnson, T. D., Jr.; Rao, D. M.

    1982-01-01

    The drag reduction devices selected for evaluation were the fence, slot, pylon-type vortex generator, and sharp leading-edge extension. These devices were tested on a 60 degree flatplate delta (with blunt leading edges) in the Langley Research Center 7- by 10-foot high-speed tunnel at low speed and to angles of attack of 28 degrees. Balance and static pressure measurements were taken. The results indicate that all the devices had significant drag reduction capability and improved longitudinal stability while a slight loss of lift and increased cruise drag occurred.

  6. High-Lift Systems on Commercial Subsonic Airliners

    NASA Technical Reports Server (NTRS)

    Rudolph, Peter K. C.

    1996-01-01

    The early breed of slow commercial airliners did not require high-lift systems because their wing loadings were low and their speed ratios between cruise and low speed (takeoff and landing) were about 2:1. However, even in those days the benefit of high-lift devices was recognized. Simple trailing-edge flaps were in use, not so much to reduce landing speeds, but to provide better glide-slope control without sideslipping the airplane and to improve pilot vision over the nose by reducing attitude during low-speed flight. As commercial-airplane cruise speeds increased with the development of more powerful engines, wing loadings increased and a real need for high-lift devices emerged to keep takeoff and landing speeds within reasonable limits. The high-lift devices of that era were generally trailing-edge flaps. When jet engines matured sufficiently in military service and were introduced commercially, airplane speed capability had to be increased to best take advantage of jet engine characteristics. This speed increase was accomplished by introducing the wing sweep and by further increasing wing loading. Whereas increased wing loading called for higher lift coefficients at low speeds, wing sweep actually decreased wing lift at low speeds. Takeoff and landing speeds increased on early jet airplanes, and, as a consequence, runways worldwide had to be lengthened. There are economical limits to the length of runways; there are safety limits to takeoff and landing speeds; and there are speed limits for tires. So, in order to hold takeoff and landing speeds within reasonable limits, more powerful high-lift devices were required. Wing trailing-edge devices evolved from plain flaps to Fowler flaps with single, double, and even triple slots. Wing leading edges evolved from fixed leading edges to a simple Krueger flap, and from fixed, slotted leading edges to two- and three-position slats and variable-camber (VC) Krueger flaps. The complexity of high-lift systems probably

  7. Structural Analysis Peer Review for the Static Display of the Orbiter Atlantis at the Kennedy Space Center Visitors Center

    NASA Technical Reports Server (NTRS)

    Minute, Stephen A.

    2013-01-01

    Mr. Christopher Miller with the Kennedy Space Center (KSC) NASA Safety & Mission Assurance (S&MA) office requested the NASA Engineering and Safety Center's (NESC) technical support on March 15, 2012, to review and make recommendations on the structural analysis being performed for the Orbiter Atlantis static display at the KSC Visitor Center. The principal focus of the assessment was to review the engineering firm's structural analysis for lifting and aligning the orbiter and its static display configuration

  8. KSC-98pc780

    NASA Image and Video Library

    1998-06-25

    KENNEDY SPACE CENTER, FLA. -- Sgt. Mark Hines, of Kennedy Space Center (KSC) Security, points out a view of a fire on the Forward Looking Infrared Radar (FLIR) video screen to Greg Dunn, of Florida's Division of Forestry, as KSC pilots fly NASA's Huey UH-1 helicopter over fires burning in Volusia County, Florida. The FLIR includes a beach-ball sized infrared camera that is mounted on the helicopter's right siderail and a real-time TV monitor and recorder installed inside. The helicopter has also been outfitted with a portable global positioning satellite (GPS) system to support the Division of Forestry as they fight the brush fires which have been plaguing the state as a result of extremely dry conditions and lightning storms. While the FLIR collects temperature data and images, the GPS system provides the exact coordinates of the fires being observed and transmits the data to the firefighters on the ground. KSC's security team routinely uses the FLIR equipment prior to Shuttle launch and landing activities to ensure that the area surrounding the launch pad and runway are clear of unauthorized personnel. KSC's Base Operations Contractor, EG&G Florida, operates the NASA-owned helicopter.

  9. KSC-2012-1861

    NASA Image and Video Library

    2012-02-17

    Presidential Visits to Kennedy Space Center: All the U. S. presidents shown here were in office at the time they visited KSC. President Dwight D. Eisenhower, 02/10/1960 President Lyndon B. Johnson visited twice, 09/14/1964 and 09/27/1966 President Richard M. Nixon viewed the Apollo 12 launch on 11/14/1969 President Jimmy Carter came to KSC on 10/01/1978 President William J. Clinton viewed the STS-95 launch on 10/29/1998 and President Barack H. Obama visited KSC twice, 04/15/2010 and 04/29/2011. Poster designed by Kennedy Space Center Graphics Department/Greg Lee. Credit: NASA

  10. Lifting Body Flight Vehicles

    NASA Technical Reports Server (NTRS)

    Barret, Chris

    1998-01-01

    NASA has a technology program in place to build the X-33 test vehicle and then the full sized Reusable Launch Vehicle, VentureStar. VentureStar is a Lifting Body (LB) flight vehicle which will carry our future payloads into orbit, and will do so at a much reduced cost. There were three design contenders for the new Reusable Launch Vehicle: a Winged Vehicle, a Vertical Lander, and the Lifting Body(LB). The LB design won the competition. A LB vehicle has no wings and derives its lift solely from the shape of its body, and has the unique advantages of superior volumetric efficiency, better aerodynamic efficiency at high angles-of-attack and hypersonic speeds, and reduced thermal protection system weight. Classically, in a ballistic vehicle, drag has been employed to control the level of deceleration in reentry. In the LB, lift enables the vehicle to decelerate at higher altitudes for the same velocity and defines the reentry corridor which includes a greater cross range. This paper outlines our LB heritage which was utilized in the design of the new Reusable Launch Vehicle, VentureStar. NASA and the U.S. Air Force have a rich heritage of LB vehicle design and flight experience. Eight LB's were built and over 225 LB test flights were conducted through 1975 in the initial LB Program. Three LB series were most significant in the advancement of today's LB technology: the M2-F; HL-1O; and X-24 series. The M2-F series was designed by NASA Ames Research Center, the HL-10 series by NASA Langley Research Center, and the X-24 series by the Air Force. LB vehicles are alive again today.

  11. KSC01padig064

    NASA Image and Video Library

    2001-02-08

    At a groundbreaking ceremony, participants and guests get ready to dig in, signifying the start of construction on a new roadway through KSC. It is the start of a construction project that includes the Space Experiment Research & Processing Laboratory (SERPL). From left are Dr. Pamella J. Dana, from the executive office of Florida’s governor, Jeb Bush; Deputy Associate Administrator Michael Hawes, Space Station, NASA; Sen. George Kirkpatrick; Spaceport Florida Authority Executive Director Ed Gormel; Executive Director Dr. Samuel T. Durrance, Florida Space Research Institute; Florida’s Lt. Gov. Frank Brogan; Congressman Dave Weldon; Center Director Roy Bridges Jr.; SFA SERPL Program Manager Debra Holliday; KSC SERPL Program Manager Jan Heuser; District Manager Cheryl Harrison-Lee, Florida Department of Transportation; State Senator Jim Sebesta; and KSC Director JoAnn H. Morgan, External Relations and Business Development. The project is enabled by a partnership and collaboration between NASA and the State of Florida to create a vital resource for international and commercial space customers. SERPL is considered a magnet facility, and will support the development and processing of life sciences experiments destined for the International Space Station and accommodate NASA, industry and academic researchers performing associated biological research

  12. KSC-06pd2034

    NASA Image and Video Library

    2006-09-04

    KENNEDY SPACE CENTER, FLA. - A Shuttle Training Aircraft (STA) is positioned in the parking area of KSC's Shuttle Landing Facility. In the specially configured aircraft, STS-115 Commander Brent Jett and Pilot Christopher Ferguson practiced landing the shuttle this morning. The space shuttle's Mate-Demate Device is seen in the background. STA practice is part of launch preparations. The STA is a Grumman American Aviation-built Gulf Stream II jet that was modified to simulate an orbiter’s cockpit, motion and visual cues, and handling qualities. In flight, the STA duplicates the orbiter’s atmospheric descent trajectory from approximately 35,000 feet altitude to landing on a runway. Because the orbiter is unpowered during re-entry and landing, its high-speed glide must be perfectly executed the first time. Mission STS-115 is scheduled to lift off about 12:29 p.m. Sept. 6. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett

  13. NASA/ASEE Summer Faculty Fellowship Program. 1991 Research Reports

    NASA Technical Reports Server (NTRS)

    Hosler, E. Ramon (Editor); Beymer, Mark A. (Editor); Armstrong, Dennis W. (Editor)

    1991-01-01

    Reports from the NASA/ASEE Summer Faculty Fellowship Program are presented. The editors are responsible for selecting appropriately qualified faculty to address some of the many problems of current interest to NASA Kennedy. Some representative titles are as follows: Development of an Accelerated Test Method for the Determination of Susceptibility to Atmospheric Corrosion; Hazardous Gas Leak Analysis in the Space Shuttle; Modeling and Control of the Automated Radiator Inspection Device; Study of the Finite Element Software Packages at KSC; Multispectral Image Processing for Plants; Algorithms for Contours Depicting Static Electric Fields during Adverse Weather Conditions; Transient Study of a Cryogenic Hydrogen Filling System; and Precision Cleaning Verification of Nonvolatile Residues by using Water, Ultrasonics, and Turbidity Analyses.

  14. KSC-08pd3235

    NASA Image and Video Library

    2008-10-16

    CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility, or PHSF, at NASA's Kennedy Space Center in Florida, the Super Lightweight Interchangeable Carrier, or SLIC, is lifted from the payload canister which transported the Hubble Space Telescope equipment back to the clean room from Launch Pad 39A. The payload for Hubble servicing mission 4 comprises four carriers holding various equipment for the mission. In the PHSF, the carriers will be stored until a new target launch date in 2009 can be set for Atlantis’ STS-125 mission. Atlantis’ October target launch date was delayed after a device on board Hubble, used in the storage and transmission of science data to Earth, shut down on Sept. 27. Replacing the broken device will be added to Atlantis’ servicing mission to the telescope. Photo credit: NASA/Jim Grossmann

  15. KSC-03pd0310

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - With the Vehicle Assembly Building looming in the background, a Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  16. KSC-07pd0647

    NASA Image and Video Library

    2007-03-20

    KENNEDY SPACE CENTER, FLA. -- High in a pine tree at NASA's Kennedy Space Center, an adult bald eagle (right) and a fledgling keep watch from their nest. There are approximately a dozen active bald eagle nests both in KSC and in the Merritt Island National Wildlife Refuge, which surrounds KSC. The refuge includes several wading bird rookeries, many osprey nests, up to 400 manatees during the spring, and approximately 2,500 Florida scrub jays. It also is a major wintering area for migratory birds. More than 500 species of wildlife inhabit the refuge, with 15 considered federally threatened or endangered. Photo credit: NASA/George Shelton

  17. KSC-07pd0366

    NASA Image and Video Library

    2007-02-09

    KENNEDY SPACE CENTER, FLA. -- Not far from the roadside in NASA's Kennedy Space Center, a female bald eagle rests near her new nest, constructed in a tall pine tree. There are approximately a dozen active bald eagle nests both in KSC and in the Merritt Island National Wildlife Refuge, which surrounds KSC. The refuge is a habitat for more than 310 species of birds, 25 mammals, 117 fishes and 65 amphibians and reptiles. In addition, the refuge supports 19 endangered or threatened wildlife species on Federal or State lists, more than any other single refuge in the U.S. Photo credit: NASA/Ken Thornsley

  18. KSC-07pd0648

    NASA Image and Video Library

    2007-03-20

    KENNEDY SPACE CENTER, FLA. -- High in a pine tree at NASA's Kennedy Space Center, an adult bald eagle (right) and a fledgling keep watch from their nest. There are approximately a dozen active bald eagle nests both in KSC and in the Merritt Island National Wildlife Refuge, which surrounds KSC. The refuge includes several wading bird rookeries, many osprey nests, up to 400 manatees during the spring, and approximately 2,500 Florida scrub jays. It also is a major wintering area for migratory birds. More than 500 species of wildlife inhabit the refuge, with 15 considered federally threatened or endangered. Photo credit: NASA/George Shelton

  19. KSC-07pd0368

    NASA Image and Video Library

    2007-02-09

    KENNEDY SPACE CENTER, FLA. -- This eagle is wary of the photographer as she sits in her nest, a new one constructed in a tall pine tree not far from the roadside in NASA's Kennedy Space Center. There are approximately a dozen active bald eagle nests both in KSC and in the Merritt Island National Wildlife Refuge, which surrounds KSC. The refuge is a habitat for more than 310 species of birds, 25 mammals, 117 fishes and 65 amphibians and reptiles. In addition, the refuge supports 19 endangered or threatened wildlife species on Federal or State lists, more than any other single refuge in the U.S. Photo credit: NASA/Ken Thornsley

  20. KSC-06pd2222

    NASA Image and Video Library

    2006-09-26

    KENNEDY SPACE CENTER, FLA. - NASA officials cut the ribbon to officially reactivate the Operations and Checkout Building's west door as entry to the crew exploration vehicle (CEV) environment. From left are Russell Romanella, director of the ISS Payload and Processing Directorate; Conrad Nagel, consultant for Space Florida; Jim Kennedy, director of KSC; Adrian Lafitte, director of government relations for Lockheed Martin; Mark Jager, program manager of Checkout, Assembly, Payloads Processing Services with Boeing; and Lynda Weatherman, with the Economic Development Commission. During the rest of the decade, KSC will transition from launching space shuttles to launching new vehicles in NASA’s Vision For Space Exploration. Photo credit: NASA/Kim Shiflett

  1. KSC-03pd0311

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. Florida Gov. Jeb Bush is at the podium. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  2. KSC00pp1921

    NASA Image and Video Library

    2000-12-08

    KENNEDY SPACE CENTER, FLA. -- Master Carpenter Norm Abram and crew of the television series "This Old House" stop in the Space Station Processing Facility on their tour of KSC. Abram is at left center. Escorting them is Bill Johnson (center, in the aisle), NASA TV manager; accompanying them is astronaut John Herrington (behind Johnson). Abram is at KSC to film an episode of the series

  3. KSC-00pp1921

    NASA Image and Video Library

    2000-12-08

    KENNEDY SPACE CENTER, FLA. -- Master Carpenter Norm Abram and crew of the television series "This Old House" stop in the Space Station Processing Facility on their tour of KSC. Abram is at left center. Escorting them is Bill Johnson (center, in the aisle), NASA TV manager; accompanying them is astronaut John Herrington (behind Johnson). Abram is at KSC to film an episode of the series

  4. KENNEDY SPACE CENTER, FLA. - KSC’s incoming Deputy Director Woodrow Whitlow speaks to employees and guests during the rollout at KSC of the Agency initiative One NASA . The event was held at the IMAX Theater® where NASA leaders discussed One NASA with selected employees. Explaining how their respective centers contribute to One NASA, along with Whitlow, were KSC Director Jim Kennedy; James Jennings, NASA’s associate deputy administrator for institutions and asset management; Ed Weiler, associate administrator for Space Science; Kevin Peterson, Dryden Flight Research Center director; and implementation team lead Johnny Stevenson. Glenn Research Center Director Dr. Julian Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center.

    NASA Image and Video Library

    2003-08-20

    KENNEDY SPACE CENTER, FLA. - KSC’s incoming Deputy Director Woodrow Whitlow speaks to employees and guests during the rollout at KSC of the Agency initiative One NASA . The event was held at the IMAX Theater® where NASA leaders discussed One NASA with selected employees. Explaining how their respective centers contribute to One NASA, along with Whitlow, were KSC Director Jim Kennedy; James Jennings, NASA’s associate deputy administrator for institutions and asset management; Ed Weiler, associate administrator for Space Science; Kevin Peterson, Dryden Flight Research Center director; and implementation team lead Johnny Stevenson. Glenn Research Center Director Dr. Julian Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center.

  5. Lifting the Runners

    NASA Image and Video Library

    2010-08-25

    Under the unflinching summer sun, workers at NASA Deep Space Network complex in Goldstone, Calif., use a crane to lift a runner segment that is part of major surgery on a giant, 70-meter-wide antenna.

  6. KSC-04PD-2214

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Olympic champion and motivational speaker Bruce Jenner talks to KSC employees during opening ceremonies for Spaceport Super Safety and Health Day at KSC. Other speakers included Dr. Pamela Peeke, Navy Com. Stephen E. Iwanowicz and NASAs Dr. Kristine Calderon. Later in the day, employees could visit many vendors exhibits featuring safety and health items. Super Safety and Health Day was initiated at KSC in 1998 to increase awareness of the importance of safety and health among the government and contractor workforce. The theme for this years event was Safety and Health: A Winning Combination.

  7. KSC-04PD-2213

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Guest speaker Dr. Pamela Peeke talks to KSC employees during opening ceremonies for Spaceport Super Safety and Health Day at KSC. Other speakers included Navy Com. Stephen E. Iwanowicz , NASAs Dr. Kristine Calderon and Olympic- great Bruce Jenner. Later in the day, employees could visit many vendors exhibits featuring safety and health items. Super Safety and Health Day was initiated at KSC in 1998 to increase awareness of the importance of safety and health among the government and contractor workforce. The theme for this years event was Safety and Health: A Winning Combination.

  8. KSC-03pd1105

    NASA Image and Video Library

    2003-04-10

    KENNEDY SPACE CENTER, FLA. -- David Mclaughlin, Prototype Lab technician at Kennedy Space Center, (center) poses with his Native American search team, the Laguna Firefighters from New Mexico, at the Hemphill site. Kennedy Space Center workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  9. KSC-04PD-0959

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. A green sea turtle that was rescued at KSC in January 2003 and rehabilitated at the Clearwater Aquarium has been returned to KSC and fitted with a sonic tracking device before release back into its environment at Mosquito Lagoon at KSC. This turtle is one of three that were found stunned, impacted by the unseasonal cold temperatures experienced in Central Florida.

  10. KSC-04PD-0960

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. A green sea turtle that was rescued at KSC in January 2003 and rehabilitated at the Clearwater Aquarium has been returned to KSC. It is being fitted with a sonic tracking device before release back into its environment at Mosquito Lagoon at KSC. This turtle is one of three that were found stunned, impacted by the unseasonal cold temperatures experienced in Central Florida.

  11. KSC-04pd0960

    NASA Image and Video Library

    2004-04-26

    KENNEDY SPACE CENTER, FLA. - A green sea turtle that was rescued at KSC in January 2003 and rehabilitated at the Clearwater Aquarium has been returned to KSC. It is being fitted with a sonic tracking device before release back into its environment at Mosquito Lagoon at KSC. This turtle is one of three that were found stunned, impacted by the unseasonal cold temperatures experienced in Central Florida.

  12. KSC-04pd0959

    NASA Image and Video Library

    2004-04-26

    KENNEDY SPACE CENTER, FLA. - A green sea turtle that was rescued at KSC in January 2003 and rehabilitated at the Clearwater Aquarium has been returned to KSC and fitted with a sonic tracking device before release back into its environment at Mosquito Lagoon at KSC. This turtle is one of three that were found stunned, impacted by the unseasonal cold temperatures experienced in Central Florida.

  13. KSC-03pd0272

    NASA Image and Video Library

    2003-02-05

    KENNEDY SPACE CENTER, FLA. - Don Maxwell, Safety, United Space Alliance, checks a map of Texas during a meeting of the Recovery Management Team at KSC. The team is part of the investigation into the accident that claimed orbiter Columbia and her crew of seven on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Other team members are Russ DeLoach, chief, Shuttle Mission Assurance Branch, NASA; George Jacobs, Shuttle Engineering; Jeff Campbell, Shuttle Engineering; Dave Rainer, Launch and Landing Operations; the two co-chairs of the Response Management Team, Denny Gagen, Landing Recovery Manager, Chris Hasselbring, Landing Operations, USA; and Larry Ulmer, Safety, NASA. The team is coordinating KSC technical support and assets to the Mishap Investigation Team in Barksdale, La., and providing support for the Recovery teams in Los Angeles, Texas, New Mexico, Arizona and California. In addition, the team is following up on local leads pertaining to potential debris in the KSC area. .

  14. KSC-04PD-0790

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Neil Yorio, a Dynamac scientist(left), explains the function of the KSC Space Life Sciences (SLS) Lab to a prestigious tour group. In the background at left is former astronaut Winston Scott; at center is Bernadette Kennedy, wife of the Center Director (CD); next to her are Columba and Florida Gov. Jeb Bush; third from right is NASA Administrator Sean OKeefe, next to his wife, Laura; and on the far right is U.S. Mint Director Henrietta Holsman Fore. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida. The tour followed the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by CD Jim Kennedy and included remarks by OKeefe, Bush, Fore and Deputy Secretary of the Treasury Samuel W. Bodman.

  15. Chronology of KSC and KSC related events for 1983

    NASA Technical Reports Server (NTRS)

    Nail, K., Jr. (Compiler)

    1984-01-01

    Materials for this chronology were selected from Aviation Week and Space Technology, Defense Daily, Miami Herald, Sentinel Star (Orlando), Today (Cocoa), Spaceport News (KSC), NASA News Releases, and other sources. The document is intended to serve as a record of KSC events and as a reference source for historians and other researchers. Arrangement is by month; items are by date of the published sources. Actual date of the event may be indicated in parenthesis, when the article itself does not make that information explicit.

  16. Shaping NASA's Kennedy Space Center Safety for the Future

    NASA Technical Reports Server (NTRS)

    Kirkpatrick, Paul; McDaniel, Laura; Smith, Maynette

    2011-01-01

    With the completion of the Space Shuttle Program, the Kennedy Space Center (KSC) safety function will be required to evolve beyond the single launch vehicle launch site focus that has held prominence for almost fifty years. This paper will discuss how that evolution is taking place. Specifically, we will discuss the future of safety as it relates to a site that will have multiple, very disparate, functions. These functions will include new business; KSC facilities not under the control of NASA; traditional payload and launch vehicle processing; and, operations conducted by NASA personnel, NASA contractors or a combination of both. A key element in this process is the adaptation of the current KSC set of safety requirements into a multi-faceted set that can address each of the functions above, while maintaining our world class safety environment. One of the biggest challenges that will be addressed is how to protect our personnel and property without dictating how other Non-NASA organizations protect their own employees and property. The past history of KSC Safety will be described and how the lessons learned from previous programs will be applied to the future. The lessons learned from this process will also be discussed as information for other locations that may undergo such a transformation.

  17. The Revolutionary Vertical Lift Technology (RVLT) Project

    NASA Technical Reports Server (NTRS)

    Yamauchi, Gloria K.

    2018-01-01

    The Revolutionary Vertical Lift Technology (RVLT) Project is one of six projects in the Advanced Air Vehicles Program (AAVP) of the NASA Aeronautics Research Mission Directorate. The overarching goal of the RVLT Project is to develop and validate tools, technologies, and concepts to overcome key barriers for vertical lift vehicles. The project vision is to enable the next generation of vertical lift vehicles with aggressive goals for efficiency, noise, and emissions, to expand current capabilities and develop new commercial markets. The RVLT Project invests in technologies that support conventional, non-conventional, and emerging vertical-lift aircraft in the very light to heavy vehicle classes. Research areas include acoustic, aeromechanics, drive systems, engines, icing, hybrid-electric systems, impact dynamics, experimental techniques, computational methods, and conceptual design. The project research is executed at NASA Ames, Glenn, and Langley Research Centers; the research extensively leverages partnerships with the US Army, the Federal Aviation Administration, industry, and academia. The primary facilities used by the project for testing of vertical-lift technologies include the 14- by 22-Ft Wind Tunnel, Icing Research Tunnel, National Full-Scale Aerodynamics Complex, 7- by 10-Ft Wind Tunnel, Rotor Test Cell, Landing and Impact Research facility, Compressor Test Facility, Drive System Test Facilities, Transonic Turbine Blade Cascade Facility, Vertical Motion Simulator, Mobile Acoustic Facility, Exterior Effects Synthesis and Simulation Lab, and the NASA Advanced Supercomputing Complex. To learn more about the RVLT Project, please stop by booth #1004 or visit their website at https://www.nasa.gov/aeroresearch/programs/aavp/rvlt.

  18. KSC-2014-1923

    NASA Image and Video Library

    2014-03-28

    VANDENBERG AIR FORCE BASE, Calif. – The lifting device detached and moved away from the upper end of the United Launch Alliance Delta II rocket for NASA's Orbiting Carbon Observatory-2 mission, or OCO-2, in the environmental enclosure, or clean room, at the top of the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California. Launch is scheduled for July 2014. The observatory will collect precise global measurements of carbon dioxide in the Earth's atmosphere and provide scientists with a better idea of the chemical compound's impacts on climate change. Scientists will analyze this data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important atmospheric gas. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  19. KSC-05PD-0799

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. Lynda Weatherman, president and CEO of the Economic Development Commission of Floridas Space Coast, and Jim Kennedy, director of Kennedy Space Center, sign a three-year Space Act Agreement for economic development cooperation in support of existing and future missions of NASA at KSC. The agreement underscores business development strategies to ensure KSC and Brevard County continue to be competitive and develop space-related initiatives.

  20. KSC-06pd2072

    NASA Image and Video Library

    2006-09-07

    KENNEDY SPACE CENTER, FLA. - The lights on Launch Pad 39B paint columns of light in the water next to the pad where Space Shuttle Atlantis is illuminated. Atlantis was originally scheduled to launch on Aug. 27, but a scrub was called by mission managers due to a concern with fuel cell 1. Atlantis is scheduled to lift off at 11:41 a.m. EDT Sept. 8. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Ken Thornsley

  1. KSC01padig281

    NASA Image and Video Library

    2001-09-29

    KODIAK ISLAND, Alaska. -- With light still on the horizon, a Lockheed Martin Athena I launch vehicle lifts off the launch pad at Kodiak Launch Complex (KSC) with the Kodiak Star spacecraft on board. Liftoff occurred at 10:40 p.m. EDT, Sept. 29. The Kodiak Star payload consists of four satellites: PICOSat, PCSat, Sapphire and Starshine 3. Starshine is sponsored by NASA. The 200-pound sphere will be used by students to study orbital decay. The other three satellites, also on educational missions, are sponsored by the department of defense. PICOSat is a technology demonstration satellite with four experiments on board. PCSat was designed by midshipmen at the U.S. Naval Academy, and will become part of the amateur radio community's automatic position reporting system. Sapphire is a micro-satellite built by students at Stanford University and Washington University - St. Louis to test infrared sensors for space use. KLC is the newest commercial launch complex in the United States, ideal for launch payloads requiring low-Earth polar or sun-synchronous orbits

  2. Heavy Lift for Exploration: Options and Utilization

    NASA Technical Reports Server (NTRS)

    Creech, Steve; Sumrall, Phil

    2010-01-01

    Every study of exploration capabilities since the Apollo Program has recommended the renewal of a heavy lift launch capability for the United States. NASA is aggressively pursuing that capability. This paper will discuss several aspects of that effort and the potential uses for that heavy lift capability. The need for heavy lift was cited most recent in the findings of the Review of U.S. Human Space Flight Plans Committee. Combined with considerations of launch availability and on-orbit operations, the Committee finds that exploration will benefit from the availability of a heavy-lift vehicle, the report said. In addition, heavy lift would enable the launching of large scientific observatories and more capable deep-space missions. It may also provide benefit in national security applications. The most recent focus of NASA s heavy lift effort is the Ares V cargo launch vehicle, which is part of the Constellation Program architecture for human exploration beyond low Earth orbit (LEO). The most recent point-of-departure configuration of the Ares V was approved during the Lunar Capabilities concept Review (LCCR) in 2008. The Ares V first stage propulsion system consists of a core stage powered by six commercial liquid hydrogen/liquid oxygen (LH2/LOX) RS-68 engines, flanked by two 5.5-segment solid rocket boosters (SRBs) based on the 5-segment Ares I first stage. The boosters use the same Polybutadiene Acrylonitrile (PBAN) propellant as the Space Shuttle. Atop the core stage is the Earth departure stage (EDS), powered by a single J-2X upper stage engine based on the Ares I upper stage engine. The 33-foot-diameter payload shroud can enclose a lunar lander, scientific instruments, or other payloads. Since LCCR, NASA has continued to refine the design through several successive internal design cycles. In addition, NASA has worked to quantify the broad national consensus for heavy lift in ways that, to the extent possible, meet the needs of the user community.

  3. Wall-modeled large eddy simulation of high-lift devices from low to post-stall angle of attacks

    NASA Astrophysics Data System (ADS)

    Bodart, Julien; Larsson, Johan; Moin, Parviz

    2013-11-01

    The flow around a McDonnell-Douglas 30P/30N multi-element airfoil at the flight Reynolds number of 9 million (based on chord) is computed using LES with an equilibrium wall-model with special treatment for transitional flows. Several different angles of attack are considered, up to and including stall, challenging the wall-model in several flow regimes. The maximum lift coefficient, which is generally difficult to predict with RANS approaches, is accurately predicted, as compared to experiments performed in the NASA LPT wind-tunnel. NASA grant: NNX11AI60A.

  4. KSC-03pd1375

    NASA Image and Video Library

    2003-04-29

    KENNEDY SPACE CENTER, FLA. - Onboard the Liberty Star, the NASA Space Shuttle support ship operated by United Space Alliance, .Dr. Grant Gilmore holds some of the equipment to be used on an undersea expedition. Gilmore is co-principle investigator of the Passive Acoustic Monitoring System (PAMS), part of the equipment. NASA/KSC is participating in the expedition to characterize the condition of the deep-sea coral reefs and reef fish populations in the Oculina Banks, a marine protected area, 20 miles offshore of the east coast of Florida. Scientists on the team will be deploying an underwater robot, a seafloor sampler, and the PAMS, originally developed by NASA to monitor the impact of rocket launches on wildlife refuge lagoons at KSC. The research is sponsored by NOAA Fisheries. The ship departed from Port Canaveral April 29 and will return May 9.

  5. KSC-05PD-1048

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. Michael Griffin (left), administrator of the National Aeronautics and Space Administration (NASA), and James Kennedy, director of the John F. Kennedy Space Center (KSC), address KSC employees during a Town Hall meeting. The meeting was held in the Training Auditorium and broadcast around the Center to employees not in attendance. This is Griffin's first official visit to Kennedy Space Center. Griffin is the 11th administrator of NASA, a role he assumed on April 14, 2005. Griffin was nominated to the position in March while serving as the Space Department head at Johns Hopkins University's Applied Physics Laboratory in Baltimore. A registered professional engineer in Maryland and California, Griffin served as chief engineer at NASA earlier in his career. He holds numerous scientific and technical degrees including a Ph.D. in Aerospace Engineering from the University of Maryland.

  6. NASA/Navy lift/cruise fan. Phase 1: Design summary

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The initial design of the LCF459 lift/cruise fan system is documented. The LCF459 is a 1.5 meter diameter turbotip lift/cruise fan whose design point pressure ratio is 1.32 at a tip speed of 353 meters per second. The gas source for the tip turbine is the YJ97-GE-100 engine.

  7. KENNEDY SPACE CENTER, FLA. - NASA’s Ed Weiler, associate administrator for Space Science, speaks to employees and guests during the rollout at KSC of the Agency initiative One NASA . The event was held at the IMAX Theater®. Explaining how their respective centers contribute to One NASA, along with Weiler, were KSC Director Jim Kennedy; James Jennings, NASA’s associate deputy administrator for institutions and asset management; Kevin Peterson, Dryden Flight Research Center director; incoming KSC Deputy Director Woodrow Whitlow; and implementation team lead Johnny Stevenson. Glenn Research Center Director Dr. Julian Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center.

    NASA Image and Video Library

    2003-08-20

    KENNEDY SPACE CENTER, FLA. - NASA’s Ed Weiler, associate administrator for Space Science, speaks to employees and guests during the rollout at KSC of the Agency initiative One NASA . The event was held at the IMAX Theater®. Explaining how their respective centers contribute to One NASA, along with Weiler, were KSC Director Jim Kennedy; James Jennings, NASA’s associate deputy administrator for institutions and asset management; Kevin Peterson, Dryden Flight Research Center director; incoming KSC Deputy Director Woodrow Whitlow; and implementation team lead Johnny Stevenson. Glenn Research Center Director Dr. Julian Earls gave a motivational speech during the luncheon held at the Visitor Complex Debus Conference Center.

  8. 21 CFR 880.5510 - Non-AC-powered patient lift.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Non-AC-powered patient lift. 880.5510 Section 880... Devices § 880.5510 Non-AC-powered patient lift. (a) Identification. A non-AC-powered patient lift is a hydraulic, battery, or mechanically powered device, either fixed or mobile, used to lift and transport a...

  9. 21 CFR 880.5510 - Non-AC-powered patient lift.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Non-AC-powered patient lift. 880.5510 Section 880... Devices § 880.5510 Non-AC-powered patient lift. (a) Identification. A non-AC-powered patient lift is a hydraulic, battery, or mechanically powered device, either fixed or mobile, used to lift and transport a...

  10. An auto lifting device to lift manhole cover with ergonomics consideration

    NASA Astrophysics Data System (ADS)

    Draman, Wan Nur A'tiqah Wan; Majid, D. L.; Ishak, Muhammad Ikman; Rosli, M. U.; Lailina N., M.; Ismail, Ras Izzati

    2017-09-01

    The sewerage and maintenance process of manhole is important to ensure that the underground pipelines and other systems are in good condition. The manhole is covered with manhole cover to prevent people, animals or any objects fall into it. The manhole cover has one pocket which is to lock it and ensure that nobody open it. A questionnaire survey is distributed to the workers at Indah Water Konsortium Sdn Bhd, Kuala Lumpur and interviews are conducted with Indah Water Konsortium (IWK) and Jabatan Perkhidmatan Pembentungan (JPP), Selangor to access the user requirements and needs for an effective manhole cover lifter. Currently, the workers used a T-hook to unlock the heavy manhole cover and lift it. However, this method affected some of the workers because they experienced back, legs, shoulders and arm injuries. The T-hook is also quite heavy and it is difficult to bring anywhere. Based on the result of questionnaire survey, four concepts are designed to create new manhole cover lifter with automated operation. The best concept is finalized by using concept screening and scoring method. The chosen concept is applied pulley chain mechanism and it is selected as the best concept because it is easy and safe to use, low cost maintenance, low time consuming and affordable price. The design of the device is suitable for Malaysian male and secured them from musculoskeletal disorder. The worker's posture is analyzed by using Rapid Upper Limb Analysis (RULA) ergonomics analysis. The stability and strength of the device is analyzed by calculation and Finite Element Analysis (FEA) is used to analyze the screw cylinder.

  11. KSC-02pd0661

    NASA Image and Video Library

    2002-05-14

    KENNEDY SPACE CENTER, FLA. -- Former astronaut Story Musgrave speaks to students and faculty from across the nation gathered at the KSC Visitor Complex for this year's NASA MarsPort Engineering Design Student Competition 2002 conference. The participants are presenting papers on engineering trade studies to design optimal configurations for a MarsPort Deployable Greenhouse for operation on the surface of Mars. Judges in the competition were from KSC, Dynamac Corporation and Florida Institute of Technology. The winning team's innovative ideas will be used by NASA to evaluate and study other engineering trade concepts. Featured at the opening ceremony were Dr. Sam Durrance, FSGC director and former astronaut, and Dr. Gary Stutte, plant scientist, Dynamac Corporation.

  12. KSC-02pd0662

    NASA Image and Video Library

    2002-05-14

    KENNEDY SPACE CENTER, FLA. -- Former astronaut Story Musgrave speaks to students and faculty from across the nation gathered at the KSC Visitor Complex for this year's NASA MarsPort Engineering Design Student Competition 2002 conference. The participants are presenting papers on engineering trade studies to design optimal configurations for a MarsPort Deployable Greenhouse for operation on the surface of Mars. Judges in the competition were from KSC, Dynamac Corporation and Florida Institute of Technology. The winning team's innovative ideas will be used by NASA to evaluate and study other engineering trade concepts. Featured at the opening ceremony were Dr. Sam Durrance, FSGC director and former astronaut, and Dr. Gary Stutte, plant scientist, Dynamac Corporation.

  13. KSC-03pd0307

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. Rabbi Zvi Konikov of the Chabad Jewish Community Center of the Space Coast is at the podium. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  14. KSC-07pd0365

    NASA Image and Video Library

    2007-02-09

    KENNEDY SPACE CENTER, FLA. -- A recent addition to the eagle nests in the Merritt Island National Wildlife Refuge is seen here in this group of tall pine trees, second from the right, not far from the roadside in NASA's Kennedy Space Center. There are approximately a dozen active bald eagle nests both in KSC and in the refuge, which surrounds KSC. The refuge is a habitat for more than 310 species of birds, 25 mammals, 117 fishes and 65 amphibians and reptiles. In addition, the refuge supports 19 endangered or threatened wildlife species on Federal or State lists, more than any other single refuge in the U.S. Photo credit: NASA/Ken Thornsley

  15. KSC-04PD-1319

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Sitting in front of the open hatch into Discovery, which is in the Orbiter Processing Facility, Mike Bolt (left), NASAs Jack Legere (center front) and Jay Feaster (right) display the Stanley Cup. Feaster is general manager of the Tampa Bay Lightning, who won the cup in 2004, and Bolt is keeper of the cup. Legere is NASA Quality Assurance specialist for the Shuttle Program. The cup was also briefly available for viewing by employees in the KSC Training Auditorium. Feaster brought the cup to KSC while on a tour. The Stanley Cup weighs 35 pounds and is more than 100 years old. The Lightning will be added to the cup in September.

  16. KSC-05PD-0801

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. Members of the Economic Development Commission (EDC) of Floridas Space Coast were on hand to witness the signing of a three-year agreement for economic development cooperation in support of existing and future missions of NASA at KSC. Lynda Weatherman (third from left), president and CEO of the EDC, and Jim Kennedy (center) , director of Kennedy Space Center, signed the Space Act Agreement. At far right is Lisa Malone, director of External Relations and Business Development at KSC. Standing with them are members of the NASA External Relations directorate who helped facilitate the Space Act Agreement are, from left, James Ball, Kim Agee, John Hudiberg, David Pierce, Jessica Livingston and Trudy McCarthy.

  17. KSC-07pd1284

    NASA Image and Video Library

    2007-05-25

    KENNEDY SPACE CENTER, FLA. -- NASA, Kennedy Space Center and State of Florida dignitaries helped launch the opening of the newest attraction at Kennedy Space Center's Visitor Complex, the Shuttle Launch Experience. At the dais is Dan LeBlanc, chief operating officer of the KSC Visitor Complex. Seated on stage are (from left) Lt. Governor of Florida Jeff Kottkamp, Center Director Bill Parsons, and former astronauts John Young and Bob Crippen. The attraction includes a simulated launch with the sights, sounds and sensations of launching into space. Find out more about the Visitor Complex and the Shuttle Launch Experience at http://www.kennedyspacecenter.com/visitKSC/attractions/index.asp. Photo credit: NASA/George Shelton

  18. KSC-08pd3239

    NASA Image and Video Library

    2008-10-16

    CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility, or PHSF, at NASA's Kennedy Space Center in Florida, the Orbital Replacement Unit Carrier, or ORUC, is lifted from the payload canister which transported the Hubble Space Telescope equipment back to the clean room from Launch Pad 39A. In the foreground is the Super Lightweight Interchangeable Carrier, or SLIC. The payload for Hubble servicing mission 4 comprises four carriers holding various equipment for the mission. In the PHSF, the carriers will be stored until a new target launch date in 2009 can be set for Atlantis’ STS-125 mission. Atlantis’ October target launch date was delayed after a device on board Hubble, used in the storage and transmission of science data to Earth, shut down on Sept. 27. Replacing the broken device will be added to Atlantis’ servicing mission to the telescope. Photo credit: NASA/Jim Grossmann

  19. KSC-2014-2824

    NASA Image and Video Library

    2014-06-03

    CAPE CANAVERAL, Fla. -- Wayne Kee, NASA emergency manager at NASA's Kennedy Space Center in Florida, moderates the center's annual hurricane awareness briefing. The briefing, held at the start of the 2014 hurricane season, is attended by the center's emergency hurricane coordinators and other interested employees in the KSC Training Auditorium. The briefing also is broadcast to the workforce. For more information, visit http://www.patrick.af.mil/weather. Photo credit: NASA/Kim Shiflett

  20. KSC-2014-4547

    NASA Image and Video Library

    2014-11-20

    CAPE CANAVERAL, Fla. – A lifting device is attached to NOAA’s Deep Space Climate Observatory spacecraft, or DSCOVR, wrapped in plastic, to remove it from its transportation pallet at the Astrotech payload processing facility in Titusville, Florida, near Kennedy Space Center. DSCOVR is a partnership between NOAA, NASA and the U.S. Air Force. DSCOVR will maintain the nation's real-time solar wind monitoring capabilities which are critical to the accuracy and lead time of NOAA's space weather alerts and forecasts. Launch is currently scheduled for January 2015 aboard a SpaceX Falcon 9 v 1.1 launch vehicle from Cape Canaveral Air Force Station, Florida. To learn more about DSCOVR, visit http://www.nesdis.noaa.gov/DSCOVR. Photo credit: NASA/Kim Shiflett

  1. KSC-04PD-2211

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. During opening ceremonies for Spaceport Super Safety and Health Day at KSC, members of the astronaut corps and KSC employees enjoy the humor of guest speaker Dr. Pamela Peeke. Other speakers included Navy Com. Stephen E. Iwanowicz, NASAs Dr. Kristine Calderon and Olympic- great Bruce Jenner. Later in the day, employees could visit many vendors exhibits featuring safety and health items. Super Safety and Health Day was initiated at KSC in 1998 to increase awareness of the importance of safety and health among the government and contractor workforce. The theme for this years event was Safety and Health: A Winning Combination.

  2. KSC-03pd1117

    NASA Image and Video Library

    2003-04-09

    KENNEDY SPACE CENTER, FLA. -- John Lopez of Bristol, Texas, a crew boss for a camp crew at the Nacogdoches site, looks over tents used by U.S. Forest Service workers in the field searching for parts of Columbia. Kennedy Space Center workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  3. Building a QC Database of Meteorological Data from NASA KSC and the United States Air Force's Eastern Range

    NASA Technical Reports Server (NTRS)

    Brenton, J. C.; Barbre, R. E.; Decker, R. K.; Orcutt, J. M.

    2018-01-01

    The National Aeronautics and Space Administration's (NASA) Marshall Space Flight Center (MSFC) Natural Environments Branch (EV44) provides atmospheric databases and analysis in support of space vehicle design and day-of-launch operations for NASA and commercial launch vehicle programs launching from the NASA Kennedy Space Center (KSC), co-located on the United States Air Force's Eastern Range (ER) at the Cape Canaveral Air Force Station. The ER complex is one of the most heavily instrumented sites in the United States with over 31 towers measuring various atmospheric parameters on a continuous basis. An inherent challenge with large datasets consists of ensuring erroneous data are removed from databases, and thus excluded from launch vehicle design analyses. EV44 has put forth great effort in developing quality control (QC) procedures for individual meteorological instruments, however no standard QC procedures for all databases currently exists resulting in QC databases that have inconsistencies in variables, development methodologies, and periods of record. The goal of this activity is to use the previous efforts to develop a standardized set of QC procedures from which to build meteorological databases from KSC and the ER, while maintaining open communication with end users from the launch community to develop ways to improve, adapt and grow the QC database. Details of the QC procedures will be described. As the rate of launches increases with additional launch vehicle programs, It is becoming more important that weather databases are continually updated and checked for data quality before use in launch vehicle design and certification analyses.

  4. The Boeing Delta II rocket with Mars Polar Lander aboard lifts off at Pad 17B, CCAS

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Silhouetted against the gray sky, a Boeing Delta II expendable launch vehicle with NASA's Mars Polar Lander lifts off from Launch Complex 17B, Cape Canaveral Air Station, at 3:21:10 p.m. EST. The lander is a solar-powered spacecraft designed to touch down on the Martian surface near the northern-most boundary of the south polar cap, which consists of carbon dioxide ice. The lander will study the polar water cycle, frosts, water vapor, condensates and dust in the Martian atmosphere. It is equipped with a robotic arm to dig beneath the layered terrain at the polar cap. In addition, Deep Space 2 microprobes, developed by NASA's New Millennium Program, are installed on the lander's cruise stage. After crashing into the planet's surface, they will conduct two days of soil and water experiments up to 1 meter (3 feet) below the Martian surface, testing new technologies for future planetary descent probes. The lander is the second spacecraft to be launched in a pair of Mars Surveyor '98 missions. The first is the Mars Climate Orbiter, which was launched aboard a Delta II rocket from Launch Complex 17A on Dec. 11, 1998.

  5. The Boeing Delta II rocket with Mars Polar Lander aboard lifts off at Pad 17B, CCAS

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Amid clouds of exhaust and into a gray-clouded sky , a Boeing Delta II expendable launch vehicle lifts off with NASA's Mars Polar Lander at 3:21:10 p.m. EST from Launch Complex 17B, Cape Canaveral Air Station. The lander is a solar-powered spacecraft designed to touch down on the Martian surface near the northern- most boundary of the south polar cap, which consists of carbon dioxide ice. The lander will study the polar water cycle, frosts, water vapor, condensates and dust in the Martian atmosphere. It is equipped with a robotic arm to dig beneath the layered terrain at the polar cap. In addition, Deep Space 2 microprobes, developed by NASA's New Millennium Program, are installed on the lander's cruise stage. After crashing into the planet's surface, they will conduct two days of soil and water experiments up to 1 meter (3 feet) below the Martian surface, testing new technologies for future planetary descent probes. The lander is the second spacecraft to be launched in a pair of Mars Surveyor '98 missions. The first is the Mars Climate Orbiter, which was launched aboard a Delta II rocket from Launch Complex 17A on Dec. 11, 1998.

  6. The Boeing Delta II rocket with Mars Polar Lander aboard lifts off at Pad 17B, CCAS

    NASA Technical Reports Server (NTRS)

    1999-01-01

    A Boeing Delta II expendable launch vehicle lifts off with NASA's Mars Polar Lander into a cloud-covered sky at 3:21:10 p.m. EST from Launch Complex 17B, Cape Canaveral Air Station. The lander is a solar-powered spacecraft designed to touch down on the Martian surface near the northern-most boundary of the south polar cap, which consists of carbon dioxide ice. The lander will study the polar water cycle, frosts, water vapor, condensates and dust in the Martian atmosphere. It is equipped with a robotic arm to dig beneath the layered terrain at the polar cap. In addition, Deep Space 2 microprobes, developed by NASA's New Millennium Program, are installed on the lander's cruise stage. After crashing into the planet's surface, they will conduct two days of soil and water experiments up to 1 meter (3 feet) below the Martian surface, testing new technologies for future planetary descent probes. The lander is the second spacecraft to be launched in a pair of Mars Surveyor '98missions. The first is the Mars Climate Orbiter, which was launched aboard a Delta II rocket from Launch Complex 17A on Dec. 11, 1998.

  7. KSC-05PD-0800

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. Lynda Weatherman, president and CEO of the Economic Development Commission of Floridas Space Coast, and Jim Kennedy, director of Kennedy Space Center, congratulate each other after signing a three-year Space Act Agreement for economic development cooperation in support of existing and future missions of NASA at KSC. The agreement underscores business development strategies to ensure KSC and Brevard County continue to be competitive and develop space-related initiatives.

  8. KSC Center Director Bridges addresses the audience at an ISO 9001 certification ceremony

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Center Director Roy Bridges speaks to KSC employees at the ISO certification ceremony held at the Training Auditorium. Bridges was presented an ISO 9001 certificate and plaque awarded to KSC by Det Norske Veritas (DNV), Inc., an international ISO certification organization. ISO 9001 comprises the most detailed, comprehensive set of standard requirements for quality programs established by the International Standards Organization. The presentation followed a successful independent audit by DNV of the KSC Management System in May of this year. The third-party auditors examined about 20 elements of KSC's system, including management responsibility, design control, documentation, test and inspection, and corrective action procedures. DNV found that KSC met or exceeded the stringent quality standards in all areas. KSC will use this certification as a tool to improve an already world- class team. All NASA centers are required by NASA Administrator Daniel S. Goldin to be ISO 9001 registered by September 1999. NASA is the first federal agency to seek the quality certification. Next to Bridges is Heidi Hollingsworth, with the Center for Independent Living, who uses American Sign Language for any hearing-impaired employees in the audience.

  9. The lift-fan aircraft: Lessons learned

    NASA Technical Reports Server (NTRS)

    Deckert, Wallace H.

    1995-01-01

    This report summarizes the highlights and results of a workshop held at NASA Ames Research Center in October 1992. The objective of the workshop was a thorough review of the lessons learned from past research on lift fans, and lift-fan aircraft, models, designs, and components. The scope included conceptual design studies, wind tunnel investigations, propulsion systems components, piloted simulation, flight of aircraft such as the SV-5A and SV-5B and a recent lift-fan aircraft development project. The report includes a brief summary of five technical presentations that addressed the subject The Lift-Fan Aircraft: Lessons Learned.

  10. KSC-2014-3776

    NASA Image and Video Library

    2014-09-07

    CAPE CANAVERAL, Fla. – Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion crew and service module stack for Exploration Flight Test-1 was lifted by crane out of the test cell. The stack has been lowered onto the mating device. Technicians are attaching the stack to the mating device. A protective covering surrounds the crew module. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch later this year atop a Delta IV Heavy rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Ben Smegelsky

  11. KSC-2009-3447

    NASA Image and Video Library

    2009-05-28

    CAPE CANAVERAL, Fla. – Under the mate/demate device at Edwards Air Force Base in California, Atlantis is fitted with a sling to lift it for attachment to the Shuttle Carrier Aircraft, or SCA, a modified Boeing 747. Atlantis landed at Edwards on May 24, which concluded mission STS-125, after two landing opportunities at Kennedy were waved off due to weather concerns. Atlantis is being returned to Florida on a ferry flight on the SCA. Atlantis' next assignment is the STS-129 mission, targeted to launch in November 2009. Photo credit: NASA/Ben Smegelsky

  12. KSC-2009-3450

    NASA Image and Video Library

    2009-05-29

    CAPE CANAVERAL, Fla. – Under the mate/demate device at Edwards Air Force Base in California, Atlantis is fitted with a sling to lift it for attachment to the Shuttle Carrier Aircraft, or SCA, a modified Boeing 747. Atlantis landed at Edwards on May 24, which concluded mission STS-125, after two landing opportunities at Kennedy were waved off due to weather concerns. Atlantis is being returned to Florida on a ferry flight on the SCA. Atlantis' next assignment is the STS-129 mission, targeted to launch in November 2009. Photo credit: NASA/Ben Smegelsky

  13. A Case Study: Using Delmia at Kennedy Space Center to Support NASA's Constellation Program

    NASA Technical Reports Server (NTRS)

    Kickbusch, Tracey; Humeniuk, Bob

    2010-01-01

    The presentation examines the use of Delmia (Digital Enterprise Lean Manufacturing Interactive Application) for digital simulation in NASA's Constellation Program. Topics include an overview of the Kennedy Space Center (KSC) Design Visualization Group tasks, NASA's Constellation Program, Ares 1 ground processing preliminary design review, and challenges and how Delmia is used at KSC, Challenges include dealing with large data sets, creating and maintaining KSC's infrastructure, gathering customer requirements and meeting objectives, creating life-like simulations, and providing quick turn-around on varied products,

  14. KSC-04PD-0253

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. KSC Director Jim Kennedy (center) makes a presentation to NASA and other officials about the benefits of locating NASAs new Shared Services Center in the Central Florida Research Park, near Orlando. Central Florida leaders are proposing the research park as the site for the NASA Shared Services Center. The center would centralize NASAs payroll, accounting, human resources, facilities and procurement offices that are now handled at each field center. The consolidation is part of the One NASA focus. Six sites around the U.S. are under consideration by NASA.

  15. NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Hosler, E. Ramon (Editor); Valdes, Carol (Editor); Brown, Tom (Editor)

    1993-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1993 NASA/ASEE Summer Faculty Fellowship Program at KSC. The basic common objectives of the Program are: to further the professional knowledge of qualified engineering and science faculty members; to stimulate an exchange of ideas between participants and NASA; to enrich and refresh the research and teaching activities of participants' institutions; and to contribute to the research objectives of the NASA centers. 1993 topics include wide band fiber optic communications, a prototype expert/information system for examining environmental risks of KSC activities, alternatives to premise wiring using ATM and microcellular technologies, rack insertion end effector (RIEE) automation, FTIR quantification of industrial hydraulic fluids in perchloroethylene, switch configuration for migration to optical fiber network, and more.

  16. New NASA Technologies for Space Exploration

    NASA Technical Reports Server (NTRS)

    Calle, Carlos I.

    2015-01-01

    NASA is developing new technologies to enable planetary exploration. NASA's Space Launch System is an advance vehicle for exploration beyond LEO. Robotic explorers like the Mars Science Laboratory are exploring Mars, making discoveries that will make possible the future human exploration of the planet. In this presentation, we report on technologies being developed at NASA KSC for planetary exploration.

  17. NASA NDE Applications for Mobile MEMS Devices and Sensors

    NASA Technical Reports Server (NTRS)

    Wilson, William C.; Atkinson, Gary M.; Barclay, R. O.

    2008-01-01

    NASA would like new devices and sensors for performing nondestructive evaluation (NDE) of aerospace vehicles. These devices must be small in size/volume, mass, and power consumption. The devices must be autonomous and mobile so they can access the internal structures of aircraft and spacecraft and adequately monitor the structural health of these craft. The platforms must be mobile in order to transport NDE sensors for evaluating structural integrity and determining whether further investigations will be required. Microelectromechanical systems (MEMS) technology is crucial to the development of the mobile platforms and sensor systems. This paper presents NASA s needs for micro mobile platforms and MEMS sensors that will enable NDE to be performed on aerospace vehicles.

  18. KSC-00pp1584

    NASA Image and Video Library

    2000-10-18

    During Super Safety and Health Day at KSC, workers from Florida Power and Light (at left) demonstrate to an interested group of KSC employees how they safely handle high power lines. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  19. KSC00pp1584

    NASA Image and Video Library

    2000-10-18

    During Super Safety and Health Day at KSC, workers from Florida Power and Light (at left) demonstrate to an interested group of KSC employees how they safely handle high power lines. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  20. KSC-98pc774

    NASA Image and Video Library

    1998-06-25

    KENNEDY SPACE CENTER, FLA. -- Sgt. Mark Hines, of Kennedy Space Center (KSC) Security, checks out equipment used to operate the Forward Looking Infrared Radar (FLIR) installed on NASA's Huey UH-1 helicopter. The helicopter has also been outfitted with a portable global positioning satellite (GPS) system to support Florida's Division of Forestry as they fight the brush fires which have been plaguing the state as a result of extremely dry conditions and lightning storms. The FLIR includes a beach ball-sized infrared camera that is mounted on the helicopter's right siderail and a real-time television monitor and recorder installed inside. While the FLIR collects temperature data and images, the GPS system provides the exact coordinates of the fires being observed and transmits the data to the firefighters on the ground. KSC's security team routinely uses the FLIR equipment prior to Shuttle launch and landing activities to ensure that the area surrounding the launch pad and runway are clear of unauthorized personnel. KSC's Base Operations Contractor, EG&G Florida, operates the NASA-owned helicopter

  1. KSC-98pc775

    NASA Image and Video Library

    1998-06-25

    KENNEDY SPACE CENTER, FLA. -- NASA's Huey UH-1 helicopter lands at the Shuttle Landing Facility to pick up Kennedy Space Center (KSC) Security personnel who operate the Forward Looking Infrared Radar (FLIR) installed on board. The helicopter has also been outfitted with a portable global positioning satellite (GPS) system to support Florida's Division of Forestry as they fight the brush fires which have been plaguing the state as a result of extremely dry conditions and lightning storms. The FLIR includes a beach ball-sized infrared camera that is mounted on the helicopter's right siderail and a real-time television monitor and recorder installed inside. While the FLIR collects temperature data and images, the GPS system provides the exact coordinates of the fires being observed and transmits the data to the firefighters on the ground. KSC's security team routinely uses the FLIR equipment prior to Shuttle launch and landing activities to ensure that the area surrounding the launch pad and runway are clear of unauthorized personnel. KSC's Base Operations Contractor, EG&G Florida, operates the NASA-owned helicopter

  2. KSC-98pc777

    NASA Image and Video Library

    1998-06-25

    KENNEDY SPACE CENTER, FLA. -- A beach ball-sized infrared camera, part of the Forward Looking Infrared Radar (FLIR), has been mounted on the right siderail of NASA's Huey UH-1 helicopter. A KSC pilot prepares to fly the helicopter, which has also been outfitted with a portable global positioning satellite (GPS) system, to support Florida's Division of Forestry as they fight the brush fires which have been plaguing the state as a result of extremely dry conditions and lightning storms. The FLIR also includes a real-time television monitor and recorder installed inside the helicopter. While the FLIR collects temperature data and images, the GPS system provides the exact coordinates of the fires being observed and transmits the data to the firefighters on the ground. The Kennedy Space Center (KSC) security team routinely uses the FLIR equipment prior to Shuttle launch and landing activities to ensure that the area surrounding the launch pad and runway are clear of unauthorized personnel. KSC's Base Operations Contractor, EG&G Florida, operates the NASA-owned helicopter

  3. KSC-99pp1275

    NASA Image and Video Library

    1999-11-01

    At Dryden Flight Research Center, Calif., KSC technician Bryan Taylor makes an adjustment on the modified X-34, known as A-1A. Taylor is one of eight NASA engineering technicians from KSC's Engineering Prototype Lab who have assisted Orbital Sciences Corporation and Dryden in the complex process of converting the X-34 A-1 vehicle from captive carry status to unpowered flight status, the A-1A. The other KSC technicians are Kevin Boughner, Roger Cartier, Mike Dininny, Mike Lane, Jerry Moscoso, James Niehoff Jr. and David Rowell. The X-34 is 58.3 feet long, 27.7 feet wide from wing tip to wing tip, and 11.5 feet tall from the bottom of the fuselage to the top of the tail. The autonomously operated technology demonstrator will be air-launched from an L-1011 airplane and should be capable of flying eight times the speed of sound, reaching an altitude of 250,000 feet. The X-34 Project is managed by NASA's Marshall Space Flight Center in Huntsville, Ala

  4. KSC-99pp1274

    NASA Image and Video Library

    1999-11-01

    At Dryden Flight Research Center, Calif., KSC technician James Niehoff Jr. (left) helps attach the wing of the modified X-34, known as A-1A. Niehoff is one of eight NASA engineering technicians from KSC's Engineering Prototype Lab who have assisted Orbital Sciences Corporation and Dryden in the complex process of converting the X-34 A-1 vehicle from captive carry status to unpowered flight status, the A-1A. The other KSC technicians are Kevin Boughner, Roger Cartier, Mike Dininny, Mike Lane, Jerry Moscoso, David Rowell and Bryan Taylor. The X-34 is 58.3 feet long, 27.7 feet wide from wing tip to wing tip, and 11.5 feet tall from the bottom of the fuselage to the top of the tail. The autonomously operated technology demonstrator will be air-launched from an L-1011 airplane and should be capable of flying eight times the speed of sound, reaching an altitude of 250,000 feet. The X-34 Project is managed by NASA's Marshall Space Flight Center in Huntsville, Ala

  5. KSC-03pd0271

    NASA Image and Video Library

    2003-02-05

    KENNEDY SPACE CENTER, FLA. - Two members of the Recovery Management Team at KSC are at work in the Operations Support Building. At left is Don Maxwell, Safety, United Space Alliance, and at right is Larry Ulmer, Safety, NASA. They are part of the investigation into the accident that claimed orbiter Columbia and her crew of seven on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Other team members are Russ DeLoach, chief, Shuttle Mission Assurance Branch, NASA; George Jacobs, Shuttle Engineering; Jeff Campbell, Shuttle Engineering; Dave Rainer, Launch and Landing Operations; and the two co-chairs of the Response Management Team, Denny Gagen, Landing Recovery Manager, and Chris Hasselbring, Landing Operations, USA. The team is coordinating KSC technical support and assets to the Mishap Investigation Team in Barksdale, La., and providing support for the Recovery teams in Los Angeles, Texas, New Mexico, Arizona and California. In addition, the team is following up on local leads pertaining to potential debris in the KSC area. .

  6. NASA Kennedy Space Center: Contributions to Sea Turtle Science and Conservation

    NASA Technical Reports Server (NTRS)

    Provancha, Jane A.; Phillips, Lynne V.; Mako, Cheryle L.

    2018-01-01

    The National Aeronautics and Space Administration (NASA) is a United States (US) federal agency that oversees US space exploration and aeronautical research. NASA's primary launch site, Kennedy Space Center (KSC) is located along the east coast of Florida, on Cape Canaveral and the western Atlantic Ocean. The natural environment within KSC's large land boundaries, not only functions as an extensive safety buffer-area, it performs simultaneously as a wildlife refuge and a national seashore. In the early 1960s, NASA was developing KSC for rocket launches and the US was establishing an awareness of, and commitment to protecting the environment. The US began creating regulations that required the consideration of the environment when taking action on federal land or with federal funds. The timing of the US Endangered Species Act (1973), the US National Environmental Policy Act (1972), coincided with the planning and implementation of the US Space Shuttle Program. This resulted in the first efforts to evaluate the impacts of space launch operation operations on waterways, air quality, habitats, and wildlife. The first KSC fauna and flora baseline studies were predominantly performed by University of Central Florida (then Florida Technological University). Numerous species of relative importance were observed and sea turtles were receiving regulatory review and protection as surveys by Dr. L Ehrhart (UCF) from 1973-1978 described turtles nesting along the KSC beaches and foraging in the KSC lagoon systems. These data were used in the first NASA Environmental Impact Statement for the Space Transportation System (shuttle program) in 1980. In 1982, NASA began a long term ecological monitoring program with contracted scientists on site. This included efforts to track sea turtle status and trends at KSC and maintain protective measures for these species. Many studies and collaborations have occurred on KSC over these last 45 years with agencies (USFWS, NOAA, NAVY), students

  7. KSC-03pd0305

    NASA Image and Video Library

    2003-02-07

    KENNEDY SPACE CENTER, FLA. - A Columbia Crew Memorial Service is held at the Shuttle Landing Facility for KSC employees and invited guests. Florida Senator Bill Nelson, seated in the center (gold tie), flew on Columbia in 1986 as a payload specialist on mission STS 61-C. Beside him (left) is Congressman Dave Weldon. The Columbia and her crew of seven were lost on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Taking part in the service were NASA Administrator Sean O’Keefe, former KSC Director Robert Crippen, astronaut Jim Halsell, several employees, area clergymen, and members of Patrick Air Force Base. The service concluded with a “Missing Man Formation Fly Over” by NASA T-38 jet aircraft.

  8. KSC-07pd0357

    NASA Image and Video Library

    2007-02-12

    KENNEDY SPACE CENTER, FLA. -- A pair of brown pelicans rest on a wall near the turn basin at NASA's Kennedy Space Center. The turn basin was carved out of the Banana River when KSC was built. The birds' habitat is sandy coastal beaches and lagoons, ranging along the Atlantic Coast from North Carolina south to Venezuela. It nests in colonies. KSC shares a boundary with the Merritt Island Wildlife Nature Refuge. The refuge is a habitat for more than 310 species of birds, 25 mammals, 117 fishes and 65 amphibians and reptiles. In addition, the Refuge supports 19 endangered or threatened wildlife species on Federal or State lists, more than any other single refuge in the U.S. Photo credit: NASA/George Shelton

  9. KSC-06pd2218

    NASA Image and Video Library

    2006-09-26

    KENNEDY SPACE CENTER, FLA. - A ribbon-cutting at NASA's Kennedy Space Center officially reactivated the Operations and Checkout Building's west door as entry to the crew exploration vehicle environment. At the podium is Russell Romanella, who opened the ceremony. Romanella is director of the ISS Payload and Processing Directorate. Seated at right are Conrad Nagel, consultant for Space Florida; Jim Kennedy, director of KSC; Adrian Lafitte, director of government relations for Lockheed Martin; Mark Jager, program manager of Checkout, Assembly, Payloads Processing Services with Boeing; and Lynda Weatherman, with the Economic Development Commission. During the rest of the decade, KSC will transition from launching space shuttles to launching new vehicles in NASA’s Vision For Space Exploration. Photo credit: NASA/Kim Shiflett

  10. KSC-04pd0800

    NASA Image and Video Library

    2004-04-07

    KENNEDY SPACE CENTER, FLA. -- Center Director Jim Kennedy presents a Florida flag to Florida Gov. Jeb Bush. The flag was flown during construction of the Space Life Sciences Lab through dedication of the Lab. The presentation was during a tour of the Lab following the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Center Director Jim Kennedy and included remarks by NASA Administrator Sean O’Keefe, Bush, U.S. Mint Director Henrietta Holsman Fore and Deputy Secretary of the Treasury Samuel W. Bodman. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida.

  11. KSC-04PD-0800

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Center Director Jim Kennedy presents a Florida flag to Florida Gov. Jeb Bush. The flag was flown during construction of the Space Life Sciences Lab through dedication of the Lab. The presentation was during a tour of the Lab following the launching ceremony at the KSC Visitor Complex for the new Florida quarter issued by the U.S. Mint. The ceremony was emceed by Center Director Jim Kennedy and included remarks by NASA Administrator Sean OKeefe, Bush, U.S. Mint Director Henrietta Holsman Fore and Deputy Secretary of the Treasury Samuel W. Bodman. The new lab is a state-of-the-art facility built for ISS biotechnology research. It was developed as a partnership between NASA-KSC and the State of Florida.

  12. The railroad tracks are being repaired at KSC

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The railroad tracks are under repair at Kennedy Space Center. This section of track is located on KSC property, just north of the NASA Causeway in the KSC Industrial Area. The repairs were required following the minor derailment of two solid rocket booster segment cars on July 18.

  13. A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Sumrall, John P.; McArthur, J. Craig

    2007-01-01

    The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007

  14. KSC-2011-6688

    NASA Image and Video Library

    2011-07-12

    CAPE CANAVERAL, Fla. -- In the high bay of the Payload Hazardous Servicing Facility (PHSF) at NASA's Kennedy Space Center in Florida, preparations are under way for a crane to lift the turning fixture connected to the multi-mission radioisotope thermoelectric generator (MMRTG) for NASA's Mars Science Laboratory (MSL) mission from its support base. Between the MMRTG and the spacecraft technicians at right is a mobile plexiglass radiation shield to help minimize the employees' radiation exposure. The turning fixture will lift and lower the MMRTG onto the MMRTG integration cart. The cart will be used to install the MMRTG on Curiosity for a fit check. The MMRTG will be installed on the rover for launch at the pad. The MMRTG will generate the power needed for the mission from the natural decay of plutonium-238, a non-weapons-grade form of the radioisotope. Heat given off by this natural decay will provide constant power through the day and night during all seasons. Curiosity, MSL's car-sized rover, has 10 science instruments designed to search for signs of life, including methane, and help determine if the gas is from a biological or geological source. Waste heat from the MMRTG will be circulated throughout the rover system to keep instruments, computers, mechanical devices and communications systems within their operating temperature ranges. Launch of MSL aboard a United Launch Alliance Atlas V rocket is planned for Nov. 25 from Space Launch Complex 41 on Cape Canaveral Air Force Station. For more information, visit http://www.nasa.gov/msl. Photo credit: NASA/Cory Huston

  15. A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Sumrall, John P.

    2006-01-01

    The National Aeronautics and Space Administration (NASA) is developing new launch systems in preparation for the retirement of the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo Saturn (1961 to 1975) and Space Shuttle (1972 to 2010) programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as the vast amount of legacy knowledge gained from almost a half-century of hard-won experience in the space enterprise. Beginning early next decade, the Ares I will launch the new Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both the Ares I and Ares V systems are being designed to support longer future trips to Mars. The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also touches on risk-based management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it gives a summary of several

  16. KSC-03pd1107

    NASA Image and Video Library

    2003-04-10

    KENNEDY SPACE CENTER, FLA. -- Members of a U.S. Forest Service search team walk a grid during a Columbia Recovery search near the Hemphill site. The group is accompanied by a space program worker able to identify potential hazards of Shuttle parts. Kennedy Space Center workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  17. KSC-03pd1106

    NASA Image and Video Library

    2003-04-10

    KENNEDY SPACE CENTER, FLA. -- Members of a U.S. Forest Service search team walk a grid during a Columbia Recovery search near the Hemphill site. The group is accompanied by a space program worker able to identify potential hazards of Shuttle parts. Kennedy Space Center workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  18. KSC-03pd1115

    NASA Image and Video Library

    2003-04-09

    KENNEDY SPACE CENTER, FLA. -- Members of a U.S. Forest Service search team walk a grid during a Columbia Recovery search near the Nacogdoches site. The group is accompanied by a space program worker able to identify potential hazards of Shuttle parts. Kennedy Space Center workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  19. KSC-03pd1116

    NASA Image and Video Library

    2003-04-09

    KENNEDY SPACE CENTER, FLA. -- Temporary camp worker Michael Trujillo of North New Mexico displays chaps in the supply tent at the Nacogdoches site. The chaps are used by U.S. Forest Service, Environmental Protection Agency and space program workers searching through dense forests in East Texas. Kennedy Space Center workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  20. KSC-97PC1280

    NASA Image and Video Library

    1997-08-22

    KENNEDY SPACE CENTER, FLA. -- William Saputo, L-3 Communications, presents a new piece of technology, developed through a National Aeronautics and Space Administration (NASA) partnership with industry, to Kennedy Space Center (KSC) Director Roy Bridges, Jr. (second from left). The piece of technology being presented, the Universal Signal Conditioning Amplifier (USCA), is a key component of the codeveloped Automated Data Acquisition System (ADAS) that measures temperature, pressure and vibration at KSC's launch pads. The breakthrough technology is expected to reduce sensor setup and configuration times from hours to seconds. KSC teamed up with Florida's Technological Research and Development Authority and manufacturer L-3 Communications to produce a system that would benefit the aerospace industry and other commercial markets

  1. KSC-98pc829

    NASA Image and Video Library

    1998-07-14

    STS-88 crew members inspect the orbital docking mechanism in the payload bay of Orbiter Endeavor during the Crew Equipment Interface Test (CEIT), held in the Orbiter Processing Facility Bay 1 at KSC. The tunnel and airlock are below it. The CEIT gives astronauts an opportunity for a hands-on look at the payloads on which they will be working on orbit. STS-88 will be the first Space Shuttle launch for the International Space Station. Scheduled to lift off from KSC on Dec. 3, 1998, the seven-day mission will be highlighted by the mating of the U.S.-built Unity connecting module to the Zarya control module, which will already be in orbit, and two space walks to connect power and data transmission cables between the two modules

  2. KSC-2011-4531

    NASA Image and Video Library

    2011-06-16

    CAPE CANAVERAL, Fla. -- At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers practice assembly and disassembling a mobile sling and crane, part of a portable mate-demate device. The portable sling and crane will be used to lift shuttles off their 747 carrier aircraft for delivery to museums next year. Shuttle Discovery will go to the Smithsonian's National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va., Endeavour will go to the California Science Center in Los Angeles and Enterprise will be moved from the Smithsonian to the Intrepid Sea, Air and Space Museum in New York. Shuttle Atlantis will go to the Kennedy Space Center Visitor Complex and won't require use of the portable sling and crane. Photo credit: NASA/Jim Grossmann

  3. KSC-2011-4530

    NASA Image and Video Library

    2011-06-16

    CAPE CANAVERAL, Fla. -- At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers practice assembly and disassembling a mobile sling and crane, part of a portable mate-demate device. The portable sling and crane will be used to lift shuttles off their 747 carrier aircraft for delivery to museums next year. Shuttle Discovery will go to the Smithsonian's National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va., Endeavour will go to the California Science Center in Los Angeles and Enterprise will be moved from the Smithsonian to the Intrepid Sea, Air and Space Museum in New York. Shuttle Atlantis will go to the Kennedy Space Center Visitor Complex and won't require use of the portable sling and crane. Photo credit: NASA/Jim Grossmann

  4. KSC-2011-4529

    NASA Image and Video Library

    2011-06-16

    CAPE CANAVERAL, Fla. -- At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers practice assembly and disassembling a mobile sling and crane, part of a portable mate-demate device. The portable sling and crane will be used to lift shuttles off their 747 carrier aircraft for delivery to museums next year. Shuttle Discovery will go to the Smithsonian's National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va., Endeavour will go to the California Science Center in Los Angeles and Enterprise will be moved from the Smithsonian to the Intrepid Sea, Air and Space Museum in New York. Shuttle Atlantis will go to the Kennedy Space Center Visitor Complex and won't require use of the portable sling and crane. Photo credit: NASA/Jim Grossmann

  5. KSC-2011-4533

    NASA Image and Video Library

    2011-06-16

    CAPE CANAVERAL, Fla. -- At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers practice assembly and disassembling a mobile sling and crane, part of a portable mate-demate device. The portable sling and crane will be used to lift shuttles off their 747 carrier aircraft for delivery to museums next year. Shuttle Discovery will go to the Smithsonian's National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va., Endeavour will go to the California Science Center in Los Angeles and Enterprise will be moved from the Smithsonian to the Intrepid Sea, Air and Space Museum in New York. Shuttle Atlantis will go to the Kennedy Space Center Visitor Complex and won't require use of the portable sling and crane. Photo credit: NASA/Jim Grossmann

  6. KSC-2011-4532

    NASA Image and Video Library

    2011-06-16

    CAPE CANAVERAL, Fla. -- At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers practice assembly and disassembling a mobile sling and crane, part of a portable mate-demate device (image left). The portable sling and crane will be used to lift shuttles off their 747 carrier aircraft for delivery to museums next year. Shuttle Discovery will go to the Smithsonian's National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va., Endeavour will go to the California Science Center in Los Angeles and Enterprise will be moved from the Smithsonian to the Intrepid Sea, Air and Space Museum in New York. Shuttle Atlantis will go to the Kennedy Space Center Visitor Complex and won't require use of the portable sling and crane. Photo credit: NASA/Jim Grossmann

  7. KSC-2011-4534

    NASA Image and Video Library

    2011-06-16

    CAPE CANAVERAL, Fla. -- At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers practice assembly and disassembling a mobile sling and crane, part of a portable mate-demate device. The portable sling and crane will be used to lift shuttles off their 747 carrier aircraft for delivery to museums next year. Shuttle Discovery will go to the Smithsonian's National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va., Endeavour will go to the California Science Center in Los Angeles and Enterprise will be moved from the Smithsonian to the Intrepid Sea, Air and Space Museum in New York. Shuttle Atlantis will go to the Kennedy Space Center Visitor Complex and won't require use of the portable sling and crane. Photo credit: NASA/Jim Grossmann

  8. KSC01padig063

    NASA Image and Video Library

    2001-02-08

    Center Director Roy Bridges Jr. addresses attendees at a groundbreaking ceremony held on S.R. 3. The groundbreaking is for a roadway, to be known as Space Commerce Way, that will serve the public by providing a 24-hour access route through KSC from S.R. 3 to the NASA Causeway and KSC Visitor Complex. It is the start of a construction project that includes the Space Experiment Research & Processing Laboratory (SERPL). The project is enabled by a partnership and collaboration between NASA and the State of Florida to create a vital resource for international and commercial space customers. Among the participants and guests seated under the tent are (in front row, at right) Florida’s Lt. Gov. Frank Brogan and Congressman Dave Weldon. SERPL is considered a magnet facility, and will support the development and processing of life sciences experiments destined for the International Space Station and accommodate NASA, industry and academic researchers performing associated biological research

  9. KSC01padig059

    NASA Image and Video Library

    2001-02-08

    Ed Gormel (left), executive director of Spaceport Florida Authority, and Roy Bridges Jr., Center Director, get ready to sign a SERPL Real Property Use Permit Agreement between the two organizations to construct a three-mile roadway. It is the start of a construction project that includes the Space Experiment Research & Processing Laboratory (SERPL). The signing took place outdoors on S.R. 3 prior to a groundbreaking ceremony for the roadway. The road, to be known as Space Commerce Way, will serve the public by providing a 24-hour access route through KSC from S.R. 3 to the NASA Causeway and KSC Visitor Complex. The SERPL project is enabled by a partnership and collaboration between NASA and the State of Florida to create a vital resource for international and commercial space customers. SERPL is considered a magnet facility, and will support the development and processing of life sciences experiments destined for the International Space Station and accommodate NASA, industry and academic researchers performing associated biological research

  10. Heavy Lift Launch Capability with a New Hydrocarbon Engine

    NASA Technical Reports Server (NTRS)

    Threet, Grady E., Jr.; Holt, James B.; Philips, Alan D.; Garcia, Jessica A.

    2011-01-01

    The Advanced Concepts Office at NASA's George C. Marshall Space Flight Center was tasked to define the thrust requirement of a new liquid oxygen rich staged combustion cycle hydrocarbon engine that could be utilized in a launch vehicle to meet NASA s future heavy lift needs. Launch vehicle concepts were sized using this engine for different heavy lift payload classes. Engine out capabilities for one of the heavy lift configurations were also analyzed for increased reliability that may be desired for high value payloads or crewed missions. The applicability for this engine in vehicle concepts to meet military and commercial class payloads comparable to current ELV capability was also evaluated.

  11. KSC-99pp1141

    NASA Image and Video Library

    1999-09-24

    KENNEDY SPACE CENTER, FLA. -- The Boeing 747 Shuttle Carrier Aircraft is cast in morning shadows as it backs away from the Mate/Demate Device with the orbiter Columbia strapped to its back. The oldest of four orbiters in NASA's fleet, Columbia is being ferried to Palmdale, Calif., where it will undergo extensive inspections and modifications in Boeing's Orbiter Assembly Facility. The nine-month orbiter maintenance down period (OMDP) is the second in Columbia's history. Orbiters are periodically removed from flight operations for an OMDP. Columbia's first was in 1994. Along with more than 100 modifications on the vehicle, Columbia will be the second orbiter to be outfitted with the multifunctional electronic display system, or "glass cockpit." Columbia is expected to return to KSC in July 2000

  12. KSC-04PD-0962

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Three green sea turtles are being released into the Mosquito Lagoon at KSC. The turtles were rescued at KSC in January 2003, after being found stunned, impacted by the unseasonal cold temperatures experienced in Central Florida, and rehabilitated at the Clearwater Aquarium. They were fitted with sonic tracking devices.

  13. KSC-04pd0962

    NASA Image and Video Library

    2004-04-26

    KENNEDY SPACE CENTER, FLA. - Three green sea turtles are being released into the Mosquito Lagoon at KSC. The turtles were rescued at KSC in January 2003, after being found stunned, impacted by the unseasonal cold temperatures experienced in Central Florida, and rehabilitated at the Clearwater Aquarium. They were fitted with sonic tracking devices.

  14. Determining Desirable Cursor Control Device Characteristics for NASA Exploration Missions

    NASA Technical Reports Server (NTRS)

    Sandor, Aniko; Holden, Kritina L.

    2007-01-01

    A test battery was developed for cursor control device evaluation: four tasks were taken from ISO 9241-9, and three from previous studies conducted at NASA. The tasks focused on basic movements such as pointing, clicking, and dragging. Four cursor control devices were evaluated with and without Extravehicular Activity (EVA) gloves to identify desirable cursor control device characteristics for NASA missions: 1) the Kensington Expert Mouse, 2) the Hulapoint mouse, 3) the Logitech Marble Mouse, and 4) the Honeywell trackball. Results showed that: 1) the test battery is an efficient tool for differentiating among input devices, 2) gloved operations were about 1 second slower and had at least 15% more errors; 3) devices used with gloves have to be larger, and should allow good hand positioning to counteract the lack of tactile feedback, 4) none of the devices, as designed, were ideal for operation with EVA gloves.

  15. KSC-00pp1275

    NASA Image and Video Library

    2000-09-08

    At the KSC Visitor Complex, Center Director Roy D. Bridges (left) and Florida’s Lieutenant Governor Frank T. Brogan sign a Memorandum of Understanding (MOU). The MOU documents the intent of NASA KSC and the State of Florida to form partnerships with academic institutions in Florida for development of aerospace-related advanced training and academic/educational programs. The three-year project anticipates that the partnership and educational programs fostered will improve the lifelong learning environment for the aerospace and engineering workforce

  16. KSC00pp1275

    NASA Image and Video Library

    2000-09-08

    At the KSC Visitor Complex, Center Director Roy D. Bridges (left) and Florida’s Lieutenant Governor Frank T. Brogan sign a Memorandum of Understanding (MOU). The MOU documents the intent of NASA KSC and the State of Florida to form partnerships with academic institutions in Florida for development of aerospace-related advanced training and academic/educational programs. The three-year project anticipates that the partnership and educational programs fostered will improve the lifelong learning environment for the aerospace and engineering workforce

  17. KSC-2014-2840

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – Workers prepare to rotate a section of the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, in a lifting device in the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  18. KSC-2014-2843

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – A section of the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, secured to a lifting device, glides across the floor of the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  19. KSC-2014-2841

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – Workers rotate a section of the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, in a lifting device in the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  20. Ares V: Progress Toward Unprecedented Heavy Lift

    NASA Technical Reports Server (NTRS)

    Sumrall, Phil

    2010-01-01

    Every major examination of America s spaceflight capability since the Apollo program has highlighted and reinforced the need for a heavy lift vehicle for human exploration, science, national security, and commercial development. The Ares V is NASA s most recent effort to address this gap and provide the needed heavy lift capability for NASA and the nation. An Ares V-class heavy lift capability is important to supporting beyond earth orbit (BEO) human exploration. Initially, that consists of exploration of the Moon vastly expanded from the narrow equatorial Apollo missions to a global capability that includes the interesting polar regions. It also enables a permanent human outpost. Under the current program of record, both the Ares V and the lunar exploration it enables serve as a significant part of the technology and experience base for exploration beyond the Moon, including Mars, asteroids, and other destinations. The Ares V is part of NASA s Constellation Program architecture. The Ares V remains in an early stage of concept development, while NASA focused on development of the Ares I crew launch vehicle to replace the Space Shuttle fleet. However, Ares V development has benefitted from its commonality with Ares I, the Shuttle, and contemporary programs on which its design is based. The Constellation program is currently slated for cancellation under the proposed 2011 federal budget, pending review by the legislative branch. However, White House guidance on its 2011 budget retains funding for heavy lift research. This paper will discuss progress to date on the Ares V and its potential utility to payload users.

  1. Catwalk grate lifting tool

    DOEpatents

    Gunter, L.W.

    1992-08-11

    A device is described for lifting catwalk grates comprising an elongated bent member with a handle at one end and a pair of notched braces and a hook at the opposite end that act in conjunction with each other to lock onto the grate and give mechanical advantage in lifting the grate. 10 figs.

  2. KSC-2012-3082

    NASA Image and Video Library

    2012-05-25

    CAPE CANAVERAL, Fla. – Children work with family members in the KSC Family Exploration Station at the Kennedy Space Center Visitor Complex. The station offered numerous scientific- and engineering-related activities for children to experience. Photo credit: NASA/Jim Grossmann

  3. KSC-2012-3083

    NASA Image and Video Library

    2012-05-25

    CAPE CANAVERAL, Fla. – Children work with family members in the KSC Family Exploration Station at the Kennedy Space Center Visitor Complex. The station offered numerous scientific- and engineering-related activities for children to experience. Photo credit: NASA/Jim Grossmann

  4. KSC-2012-3085

    NASA Image and Video Library

    2012-05-25

    CAPE CANAVERAL, Fla. – Children work with family members in the KSC Family Exploration Station at the Kennedy Space Center Visitor Complex. The station offered numerous scientific- and engineering-related activities for children to experience. Photo credit: NASA/Jim Grossmann

  5. KSC-03pd0267

    NASA Image and Video Library

    2003-02-05

    KENNEDY SPACE CENTER, FLA. - Employees at KSC reveal emotion as they watch the memorial service for the fallen seven astronauts of Columbia being held at Johnson Space Center, Houston, and broadcast on NASA television. .

  6. KSC-03PD-0267

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. - Employees at KSC reveal emotion as they watch the memorial service for the fallen seven astronauts of Columbia being held at Johnson Space Center, Houston, and broadcast on NASA television. .

  7. KSC-75PC-0365

    NASA Image and Video Library

    1975-07-17

    CAPE CANAVERAL, Fla. -- Technicians check out the Symphonie-B spacecraft during launch preparations at KSC. Symphonie is a synchronous-orbit communications satellite, jointly owned and managed by West Germany and France. Photo credit: NASA

  8. KSC-03PD-2451

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. Daniel L. Tweed, with the Facilities Division, NASA Spaceport Services, addresses attendees at the ribbon cutting for the KSC Security gates. Tweed was project manager. The two new Security gates on Kennedy Parkway (Gate 2) and NASA Parkway (Gate 3) were activated Aug. 1, allowing the general public to have access to the new Space Commerce Way, which will provide access to the Research Park and KSC Visitor Complex, and providing an alternate route for the general public between Titusville and Merritt Island that is accessible 24 hours a day. The gates are staffed 24 hours daily. Others taking part in the ribbon cutting were Center Director Jim Kennedy; Chief, Protective & Safe Guards Office, Calvin L. Burch; SGS Deputy Program Manager William A. Sample; and Bobby Porter, with Oneida Construction.

  9. Rocket University at KSC

    NASA Technical Reports Server (NTRS)

    Sullivan, Steven J.

    2014-01-01

    "Rocket University" is an exciting new initiative at Kennedy Space Center led by NASA's Engineering and Technology Directorate. This hands-on experience has been established to develop, refine & maintain targeted flight engineering skills to enable the Agency and KSC strategic goals. Through "RocketU", KSC is developing a nimble, rapid flight engineering life cycle systems knowledge base. Ongoing activities in RocketU develop and test new technologies and potential customer systems through small scale vehicles, build and maintain flight experience through balloon and small-scale rocket missions, and enable a revolving fresh perspective of engineers with hands on expertise back into the large scale NASA programs, providing a more experienced multi-disciplined set of systems engineers. This overview will define the Program, highlight aspects of the training curriculum, and identify recent accomplishments and activities.

  10. KSC-07pd0374

    NASA Image and Video Library

    2007-02-09

    KENNEDY SPACE CENTER, FLA. -- Partly covered with moss (foreleg and mouth), a large alligator suns on the bank of a pond within NASA's Kennedy Space Center. A protected species, alligators can be spotted in the drainage canals and other waters surrounding KSC. American alligators feed and rest in the water, and lay their eggs in dens they dig into the banks. The young alligators spend their first several weeks in these dens. KSC shares a boundary with the Merritt Island National Wildlife Refuge. The refuge is a habitat for more than 310 species of birds, 25 mammals, 117 fishes and 65 amphibians and reptiles. In addition, the refuge supports 19 endangered or threatened wildlife species on Federal or State lists, more than any other single refuge in the U.S. Photo credit: NASA/Ken Thornsley

  11. KSC-07pd0373

    NASA Image and Video Library

    2007-02-09

    KENNEDY SPACE CENTER, FLA. -- A large alligator suns on the bank of a pond within NASA's Kennedy Space Center. A protected species, alligators can be spotted in the drainage canals and other waters surrounding KSC. American alligators feed and rest in the water, and lay their eggs in dens they dig into the banks. The young alligators spend their first several weeks in these dens. KSC shares a boundary with the Merritt Island National Wildlife Refuge. The refuge is a habitat for more than 310 species of birds, 25 mammals, 117 fishes and 65 amphibians and reptiles. In addition, the refuge supports 19 endangered or threatened wildlife species on Federal or State lists, more than any other single refuge in the U.S. Photo credit: NASA/Ken Thornsley

  12. KSC-07pd0157

    NASA Image and Video Library

    2007-01-19

    KENNEDY SPACE CENTER, FLA. -- On NASA's Kennedy Space Center, the bank of a pond provides the perfect spot for sunbathing alligators. American alligators feed and rest in the water, and lay their eggs in dens they dig into the banks. The young alligators spend their first several weeks in these dens. A protected species, alligators can be spotted in the drainage canals and other waters surrounding KSC. KSC shares a boundary with the Merritt Island Wildlife Nature Refuge. The refuge is a habitat for more than 310 species of birds, 25 mammals, 117 fishes and 65 amphibians and reptiles. In addition, the Refuge supports 19 endangered or threatened wildlife species on Federal or State lists, more than any other single refuge in the U.S. Photo credit: NASA/Ken Thornsley

  13. KSC-07pd0155

    NASA Image and Video Library

    2007-01-19

    KENNEDY SPACE CENTER, FLA. -- On NASA's Kennedy Space Center, alligators begin climbing out of a pond to sunbathe on the bank. American alligators feed and rest in the water, and lay their eggs in dens they dig into the banks. The young alligators spend their first several weeks in these dens. A protected species, alligators can be spotted in the drainage canals and other waters surrounding KSC. KSC shares a boundary with the Merritt Island Wildlife Nature Refuge. The refuge is a habitat for more than 310 species of birds, 25 mammals, 117 fishes and 65 amphibians and reptiles. In addition, the Refuge supports 19 endangered or threatened wildlife species on Federal or State lists, more than any other single refuge in the U.S. Photo credit: NASA/Ken Thornsley

  14. KSC-99pp0406

    NASA Image and Video Library

    1999-04-08

    KENNEDY SPACE CENTER, FLA. -- At the grand opening of the newly expanded KSC Visitor Complex, Center Director Roy Bridges presents Deep Space Nine star Avery Brooks with a plaque, NASA jacket and hat. Brooks narrates the new film Quest for Life at the Visitor Center. Brooks was recognized for his contribution to advancing the public's understanding of NASA and the search for life elsewhere in the universe. The Complex now includes an International Space Station-themed ticket plaza, featuring a structure of overhanging solar panels and astronauts performing assembly tasks, a new foyer, films, and exhibits. The KSC Visitor Complex was inaugurated three decades ago and is now one of the top five tourist attractions in Florida. It is located on S.R. 407, east of I-95, within the Merritt Island National Wildlife Refuge

  15. FEB (Multifilter Electronics Box) lifting device analysis, revision A

    NASA Astrophysics Data System (ADS)

    Croskey, Charles L.

    1988-02-01

    This document is to determine the mechanical loads produced when the FEB is either lifted manually with handles or by a sling and overhead hoist. 2. Relevant Documents 2.1 JA418 2.2 ES-MAS-DS-003 MAS Ground Support Equipment Specification 2.3 An Introduction to the Design and Behavior of Bolted Joints John H. Bickford, MARCEL DEKKER, New York 3. Lifting Apparatus 3.1 For the lifting of FEB by either handles or a sling from an overhead hoist, four eyebolts are attached to the top mounting edge, through the top cover and into the top flange of the sidewalls. When the FEB is to be lifted manually without mechanical assistance, two long stainless steel rods are inserted lengthwise through the upright eyebolts. A small collar is then slipped over the rod so that the rod cannot shift lengthwise. The rod ends which extend beyond the eyebolt positions serve as handles for two people to lift the FEB. When an overhead hoist is to be used, the rods are not used. Instead a wire-rope sling is attached to each eyebolt. The four sling arms meet at a center jump ring which is lifted by the hook of the overhead crane. A spreader frame is used just above the eye-bolt attachments so that the load transfered to the bolts is strictly vertical.

  16. KSC-03PD-2177

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. Children enjoy a hands-on display of fire equipment behind KSC NASA Headquarters. Employees were invited to share their work experience with their children for Take Our Children to Work Day.

  17. KSC00pp1578

    NASA Image and Video Library

    2000-10-18

    Center Director Roy Bridges talks to workers outside the Hazardous Maintenance Facility during Super Safety and Health Day at KSC. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  18. KSC-00pp1578

    NASA Image and Video Library

    2000-10-18

    Center Director Roy Bridges talks to workers outside the Hazardous Maintenance Facility during Super Safety and Health Day at KSC. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  19. KSC-03pd1104

    NASA Image and Video Library

    2003-04-10

    KENNEDY SPACE CENTER, FLA. -- At left, David Mclaughlin, Prototype Lab technician at Kennedy Space Center, listens to a coworker at the Hemphill site in East Texas before going to the field with his search team. Mclaughlin holds a walking stick used to beat down briars and knock away snakes in the East Texas woods. Kennedy Space Center workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC.

  20. KSC00pp1586

    NASA Image and Video Library

    2000-10-18

    Employees take a look at this NASCAR auto being displayed during Super Safety and Health Day at KSC. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  1. KSC00pp1588

    NASA Image and Video Library

    2000-10-18

    In an exhibit tent during Super Safety and Health Day at KSC, employees sample iced tea from a vendor. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of healthand safety-related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  2. KSC-00pp1588

    NASA Image and Video Library

    2000-10-18

    In an exhibit tent during Super Safety and Health Day at KSC, employees sample iced tea from a vendor. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of healthand safety-related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  3. KSC-00pp1586

    NASA Image and Video Library

    2000-10-18

    Employees take a look at this NASCAR auto being displayed during Super Safety and Health Day at KSC. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  4. KSC-00pp1589

    NASA Image and Video Library

    2000-10-18

    Employees gather around a demonstration by Florida Power and Light during Super Safety and Health Day at KSC. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of healthand safety-related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  5. KSC00pp1589

    NASA Image and Video Library

    2000-10-18

    Employees gather around a demonstration by Florida Power and Light during Super Safety and Health Day at KSC. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of healthand safety-related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  6. KSC01padig113

    NASA Image and Video Library

    2001-03-02

    Student teams adjust their robots before competing on the playing field field during the NASA/KSC FIRST Southeastern Regional event held March 1-3, 2001. At left is the ComBBAT 2001 team from Astronaut and Titusville High Schools, Florida. It is a KSC joint-sponsored team. At right is the PC Panthers, no. 710, from Pine Crest School, Fort Lauderdale, Fla. FIRST (For Inspiration and Recognition of Science and Technology) events are held nationwide, pitting robots against each other and the clock on a playing field. Many teams are sponsored by corporations and academic institutions. There are 27 teams throughout the State of Florida who are competing. KSC, which sponsors nine teams, has held the regional event for two years

  7. JWST Lifting System

    NASA Technical Reports Server (NTRS)

    Tolleson, William

    2012-01-01

    A document describes designing, building, testing, and certifying a customized crane (Lifting Device LD) with a strong back (cradle) to facilitate the installation of long wall panels and short door panels for the GHe phase of the James Webb Space Telescope (JWST). The LD controls are variable-frequency drive controls designed to be adjustable for very slow and very-short-distance movements throughout the installation. The LD has a lift beam with an electric actuator attached at the end. The actuator attaches to a rectangular strong back (cradle) for lifting the long wall panels and short door panels from a lower angle into the vertical position inside the chamber, and then rotating around the chamber for installation onto the existing ceiling and floor. The LD rotates 360 (in very small increments) in both clockwise and counterclockwise directions. Eight lifting pads are on the top ring with 2-in. (.5-cm) eye holes spaced evenly around the ring to allow for the device to be suspended by three crane hoists from the top of the chamber. The LD is operated by remote controls that allow for a single, slow mode for booming the load in and out, with slow and very slow modes for rotating the load.

  8. KSC-04PD-0963

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. A green sea turtle makes its way back into the Mosquito Lagoon at KSC. It is one of three turtles rescued at KSC in January 2003 and rehabilitated at the Clearwater Aquarium. The turtles were found stunned, impacted by the unseasonal cold temperatures experienced in Central Florida. They have been fitted with sonic tracking devices.

  9. KSC-04pd0963

    NASA Image and Video Library

    2004-04-26

    KENNEDY SPACE CENTER, FLA. - A green sea turtle makes its way back into the Mosquito Lagoon at KSC. It is one of three turtles rescued at KSC in January 2003 and rehabilitated at the Clearwater Aquarium. The turtles were found stunned, impacted by the unseasonal cold temperatures experienced in Central Florida. They have been fitted with sonic tracking devices.

  10. KSC01padig096

    NASA Image and Video Library

    2001-03-01

    Students and their mentors prepare their team robot to compete in the NASA/KSC FIRST Southeastern Regional event.  FIRST (For Inspiration and Recognition of Science and Technology) events are held nationwide, pitting the student-built robots against each other and the clock on a playing field.   Many teams are sponsored by corporations and academic institutions.  There are 27 teams throughout the State of Florida who are competing.  KSC, which sponsors nine teams, has held the regional event for two years.

  11. KSC00pp1276

    NASA Image and Video Library

    2000-09-08

    At the KSC Visitor Complex, Center Director Roy D. Bridges (left) and Florida’s Lieutenant Governor Frank T. Brogan shake hands after signing a Memorandum of Understanding (MOU). The MOU documents the intent of NASA KSC and the State of Florida to form partnerships with academic institutions in Florida for development of aerospace-related advanced training and academic/educational programs. The three-year project anticipates that the partnership and educational programs fostered will improve the lifelong learning environment for the aerospace and engineering workforce

  12. KSC-00pp1276

    NASA Image and Video Library

    2000-09-08

    At the KSC Visitor Complex, Center Director Roy D. Bridges (left) and Florida’s Lieutenant Governor Frank T. Brogan shake hands after signing a Memorandum of Understanding (MOU). The MOU documents the intent of NASA KSC and the State of Florida to form partnerships with academic institutions in Florida for development of aerospace-related advanced training and academic/educational programs. The three-year project anticipates that the partnership and educational programs fostered will improve the lifelong learning environment for the aerospace and engineering workforce

  13. KSC-03PD-3248

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. -- From front row left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and NASA Space Shuttle Program Manager William Parsons are trained on the proper use of the Emergency Life Support Apparatus (ELSA). NASA and United Space Alliance (USA) Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  14. KSC technicians on team to modify X-34

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Two of KSC's X-34 technicians (far right), David Rowell and Roger Cartier, look at work being done on the modified A-1A at Dryden Flight Research Center, Calif. Since September, eight NASA engineering technicians from KSC's Engineering Prototype Lab have assisted Orbital Sciences Corporation and NASA's Dryden Flight Research Center in the complex process of converting the X-34 A-1 vehicle from captive carry status to unpowered flight status, the A-1A. The other KSC technicians are Kevin Boughner, Mike Dininny, Mike Lane, Jerry Moscoso, James Niehoff Jr. and Bryan Taylor. The X-34 is 58.3 feet long, 27.7 feet wide from wing tip to wing tip, and 11.5 feet tall from the bottom of the fuselage to the top of the tail. The autonomously operated technology demonstrator will be air-launched from an L-1011 airplane and should be capable of flying eight times the speed of sound, reaching an altitude of 250,000 feet. The X-34 Project is managed by NASA's Marshall Space Flight Center in Huntsville, Ala.

  15. KSC-98pc1194

    NASA Image and Video Library

    1998-10-01

    Workers at this clean room facility, Cape Canaveral Air Station, prepare to lift the protective can that covered Deep Space 1 during transportation from KSC. The spacecraft will undergo spin testing at the site. Deep Space 1, the first flight in NASA's New Millennium Program, is designed to validate 12 new technologies for scientific space missions of the next century. Onboard experiments include a solar-powered ion propulsion engine and software that tracks celestial bodies so the spacecraft can make its own navigation decisions without the intervention of ground controllers. The ion propulsion engine is the first non-chemical propulsion to be used as the primary means of propelling a spacecraft. Deep Space 1 will complete most of its mission objectives within the first two months, but may also do a flyby of a near-Earth asteroid, 1992 KD, in July 1999. The spacecraft will be launched aboard a Boeing Delta 7326 rocket from Launch Pad 17A, Cape Canaveral Air Station, in October. Delta II rockets are medium capacity expendable launch vehicles derived from the Delta family of rockets built and launched since 1960. Since then there have been more than 245 Delta launches

  16. KENNEDY SPACE CENTER, FLA. - Lisa Malone, deputy director of External Relations and Business Development at KSC, emcees a ceremony in the Space Station Processing Facility to highlight the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope) arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Speakers at the ceremony included KSC Director Roy Bridges Jr.; NASA's Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs, and William Gerstenmaier, International Space Station Program manager; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.

    NASA Image and Video Library

    2003-06-18

    KENNEDY SPACE CENTER, FLA. - Lisa Malone, deputy director of External Relations and Business Development at KSC, emcees a ceremony in the Space Station Processing Facility to highlight the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope) arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Speakers at the ceremony included KSC Director Roy Bridges Jr.; NASA's Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs, and William Gerstenmaier, International Space Station Program manager; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.

  17. KSC-99pp1273

    NASA Image and Video Library

    1999-11-01

    KSC technician David Rowell works on the wing of the modified X-34, known as A-1A, at the Dryden Flight Research Center, Calif. Looking on are Art Cape, with Dryden, and Mike Brainard, with Orbital Sciences Corporation. Rowell is one of eight NASA engineering technicians from KSC's Engineering Prototype Lab who have assisted Orbital and Dryden in the complex process of converting the X-34 A-1 vehicle from captive carry status to unpowered flight status, the A-1A. The other KSC technicians are Kevin Boughner, Roger Cartier, Mike Dininny, Mike Lane, Jerry Moscoso, James Niehoff Jr. and Bryan Taylor. The X-34 is 58.3 feet long, 27.7 feet wide from wing tip to wing tip, and 11.5 feet tall from the bottom of the fuselage to the top of the tail. The autonomously operated technology demonstrator will be air-launched from an L-1011 airplane and should be capable of flying eight times the speed of sound, reaching an altitude of 250,000 feet. The X-34 Project is managed by NASA's Marshall Space Flight Center in Huntsville, Ala

  18. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    A Small Business panel discussion was held during Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. Seated at the table, from left, are Ileana Serrano, data dissemination specialist, U.S. Census Bureau; Margot Dorfman, chief executive officer, U.S. Women's Chamber of Commerce; Valerie Muck, Small Business director; U.S. Air Force; Andrew Harold, co-founder and board chairman, Florida 8(a) Alliance; and Eduardo Ramos, senior area manager, U.S. Small Business Administration. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  19. KSC-04pd1839

    NASA Image and Video Library

    2004-09-18

    KENNEDY SPACE CENTER, FLA. - From left, Martin Wilson, manager of Thermal Protection System (TPS) operations for United Space Alliance, briefs NASA Administrator Sean O’Keefe, KSC Director of the Spaceport Services Scott Kerr, NASA Associate Administrator of the Space Operations Mission Directorate William Readdy, and Center Director James Kennedy (right) on the temporary tile shop set up in the RLV hangar. O’Keefe and Readdy are visiting KSC to survey the damage sustained by KSC facilities from Hurricane Frances. The Thermal Protection System Facility (TPSF), which creates the TPS tiles, blankets and all the internal thermal control systems for the Space Shuttles, is almost totally unserviceable at this time after losing approximately 35 percent of its roof in the storm, which blew across Central Florida Sept. 4-5. Undamaged equipment was removed from the TPSF and stored in the hangar. NASA’s three Space Shuttle orbiters -- Discovery, Atlantis and Endeavour - along with the Shuttle launch pads, all of the critical flight hardware for the orbiters and the International Space Station, and NASA’s Swift spacecraft, awaiting launch in October, were well protected and unharmed.

  20. KSC-04pd1851

    NASA Image and Video Library

    2004-09-18

    KENNEDY SPACE CENTER, FLA. - Looking at damage inside the hurricane-ravaged Thermal Protection System Facility are KSC Director of Spaceport Services Scott Kerr (left) and NASA Associate Administrator of Space Operations Mission Directorate William Readdy (right). The TPSF, which creates the TPS tiles, blankets and all the internal thermal control systems for the Space Shuttles, is almost totally unserviceable at this time after losing approximately 35 percent of its roof during Hurricane Frances, which blew across Central Florida Sept. 4-5. Readdy and NASA Administrator Sean O’Keefe are visiting KSC to survey the damage sustained by KSC facilities from the hurricane. The Labor Day storm also caused significant damage to the Vehicle Assembly Building and Processing Control Center. Additionally, the Operations and Checkout Building, Vertical Processing Facility, Hangar AE, Hangar S and Hangar AF Small Parts Facility each received substantial damage. However, well-protected and unharmed were NASA’s three Space Shuttle orbiters - Discovery, Atlantis and Endeavour - along with the Shuttle launch pads, all of the critical flight hardware for the orbiters and the International Space Station, and NASA’s Swift spacecraft that is awaiting launch in October.

  1. Ribbon-cutting ceremony occurs at grand opening of new International Space Station Center at KSC

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Celebrating the official opening of the new International Space Station (ISS) Center at Kennedy Space Center are, left to right, James Ball, chief, NASA Public Services, KSC; KSC Director Roy D. Bridges Jr.; Hugh Harris, director, NASA Public Affairs, KSC; and Rick Abramson, president and chief operating officer, Delaware North Parks Services of Spaceport Inc. Center Director Bridges cuts the ribbon to the new tour attraction where full-scale mockups of station modules, through which visitors can walk, are on display. These include the Habitation Unit, where station crew members will live, sleep, and work; a Laboratory Module; and the Pressurized Logistics Module, where racks and supplies will be transported back and forth from KSC to space. Guests also can take an elevated walkway to a gallery overlooking the work are where actual ISS hardware is prepared for flight into space. This new tour site, in addition to a new Launch Complex 39 Observation Gantry, are part of a comprehensive effort by NASA and Delaware North to expand and improve the KSC public tour and visitor facilities.

  2. A summary of joint US-Canadian augmentor wing powered-lift STOL research programs at the Ames Research Center, NASA, 1975-1980

    NASA Technical Reports Server (NTRS)

    Hindson, W. S.; Hardy, G.

    1980-01-01

    Several different flight research programs carried out by NASA and the Canadian Government using the Augmentor Wing Jet STOL Research Aircraft to investigate the design, operational, and systems requirements for powered-lift STOL aircraft are summarized. Some of these programs considered handling qualities and certification criteria for this class of aircraft, and addressed pilot control techniques, control system design, and improved cockpit displays for the powered-lift STOL approach configuration. Other programs involved exploiting the potential of STOL aircraft for constrained terminal-area approaches within the context of present or future air traffic control environments. Both manual and automatic flight control investigations are discussed, and an extensive bibliography of the flight programs is included.

  3. KSC-2009-2211

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – The booster segments for the Ares I-X test rocket were delivered to NASA's Kennedy Space Center in Florida by the Florida East Coast Railroad and the NASA Railroad. Accompanying the train on its route from Jacksonville, Fla., were NASA and ATK officials. Standing here, from left, are ATK Ares I Flight Tests Program Director Joe Oliva, ATK Ares I-X Florida Program Manager Russ Page, NASA Ares Program Manager Steve Cook, ATK Deputy Site Director in Florida Ted Shaffner, NASA KSC Ares I-X Deputy Mission Manager Jon Cowart, ATK Vice President of Space Launch Propulson Cary Ralston, ATK Ares I First Stage program Director Fred Brasfield, ATK Vice President Space Launch Systems Charlie Precourt, ATK Ares I Flight Tests Deputy Program Director Kathy Philpot, NASA Marshall Space Flight Center Reusable Solid Rocket Booster Integration Lead Roy Worthy, ATK Florida Site Director Bob Herman, NASA Res First Stage Project Manager Alex Priskos and NASA KSC Shuttle Launch Director Mike Leinbach. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  4. KSC-06pd0460

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - During the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando, Kennedy Space Center Director Jim Kennedy (left) greets members of the "Pink Team," whose robot is named Roccobot and is co-sponsored by NASA KSC. At least four teams in the competition were sponsored by KSC, NASA and contractors. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  5. KSC-06pd0458

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - Members of the "Pink Team" explain their robot to Florida Governor Jeb Bush at the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando. The Pink Team, whose robot is named Roccobot, is co-sponsored by NASA KSC. At least four teams in the competition were sponsored by KSC, NASA and contractors. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  6. KSC-04pd0915

    NASA Image and Video Library

    2004-03-31

    KENNEDY SPACE CENTER, FLA. - Known as the press mound, this site holds the press bleachers (center left), the NASA-KSC News Center (center) and television network buildings at right, along with trailers for networks such as API.

  7. KSC-2014-3145

    NASA Image and Video Library

    2014-07-08

    CAPE CANAVERAL, Fla. -- In the KSC Training Auditorium at NASA's Kennedy Space Center in Florida, Center Director Robert Cabana makes the opening remarks at a special event marking the 50th anniversary of the Civil Rights Act of 1964. Dr. Mary Frances Berry, an award-winning civil rights activist and former member of the U.S. Commission on Civil Rights, was the guest speaker. The event was presented by Kennedy's Office of Diversity and Equal Opportunity. For more information on Kennedy Space Center, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Kim Shiflett

  8. Metrics for NASA Aeronautics Research Mission Directorate (ARMD) Strategic Thrust 3B Vertical Lift Strategic Direction

    NASA Technical Reports Server (NTRS)

    Hochstetler, Ronald D.; Salvano, Dan; Gorton, Susan A.

    2017-01-01

    The NASA Aeronautics Research Mission Directorate (ARMD) Strategic Implementation Plan details an ambitious plan for aeronautical research for the next quarter century and beyond. It includes a number of advanced technologies needed to address requirements of the overall aviation community (domestic and international), with an emphasis on safety, efficiency, operational flexibility, and alternative propulsion air transport options. The six ARMD Strategic Thrust Areas (STAs) represent a specific set of multi-decade research agendas for creating the global aviation improvements most in demand by the aviation service consumers and the general public. To provide NASA with a measurement of the preeminent value of these research areas, it was necessary to identify and quantify the measurable benefits to the aviation community from capabilities delivered by the research programs. This paper will describe the processes used and the conclusions reached in defining the principal metrics for ARMD Strategic Thrust Area 3B "Vertical Lift Strategic Direction."

  9. Building a QC Database of Meteorological Data From NASA KSC and the United States Air Force's Eastern Range

    NASA Technical Reports Server (NTRS)

    Brenton, James C.; Barbre, Robert E.; Orcutt, John M.; Decker, Ryan K.

    2018-01-01

    The National Aeronautics and Space Administration's (NASA) Marshall Space Flight Center (MSFC) Natural Environments Branch (EV44) has provided atmospheric databases and analysis in support of space vehicle design and day-of-launch operations for NASA and commercial launch vehicle programs launching from the NASA Kennedy Space Center (KSC), co-located on the United States Air Force's Eastern Range (ER) at the Cape Canaveral Air Force Station. The ER is one of the most heavily instrumented sites in the United States measuring various atmospheric parameters on a continuous basis. An inherent challenge with the large databases that EV44 receives from the ER consists of ensuring erroneous data are removed from the databases, and thus excluded from launch vehicle design analyses. EV44 has put forth great effort in developing quality control (QC) procedures for individual meteorological instruments; however, no standard QC procedures for all databases currently exist resulting in QC databases that have inconsistencies in variables, methodologies, and periods of record. The goal of this activity is to use the previous efforts by EV44 to develop a standardized set of QC procedures from which to build flags within the meteorological databases from KSC and the ER, while maintaining open communication with end users from the launch community to develop ways to improve, adapt and grow the QC database. Details of the QC checks are described. The flagged data points will be plotted in a graphical user interface (GUI) as part of a manual confirmation that the flagged data do indeed need to be removed from the archive. As the rate of launches increases with additional launch vehicle programs, more emphasis is being placed to continually update and check weather databases for data quality before use in launch vehicle design and certification analyses.

  10. Numerical analysis of a variable camber rotor blade as a lift control device

    NASA Technical Reports Server (NTRS)

    Awani, A. O.; Stroub, R. H.

    1984-01-01

    A new rotor configuration called the variable camber rotor was numerically investigated as a lift control device. This rotor differs from a conventional (baseline) rotor only in the blade aft section. In this configuration, the aft section or flap is attached to the forward section by pin joint arrangement, and also connected to the rotor control system for the control of rotor thrust level and vectoring. Pilot action to the flap deflection controls rotor lift and tip path plane tilt. The drag due to flaps is presented and the theoretical result correlated with test data. The assessment of payoff for the variable camber rotor in comparison with conventional (baseline) rotor was examined in hover. The variable camber rotor is shown to increase hover power required by 1.35%, but such a minimal power penalty is not significant enough to be considered a negative result. In forward flight, the control needs of the variable camber rotor were evaluated.

  11. Parametric Investigation of a High-Lift Airfoil at High Reynolds Numbers

    NASA Technical Reports Server (NTRS)

    Lin, John C.; Dominik, Chet J.

    1997-01-01

    A new two-dimensional, three-element, advanced high-lift research airfoil has been tested in the NASA Langley Research Center s Low-Turbulence Pressure Tunnel at a chord Reynolds number up to 1.6 x 107. The components of this high-lift airfoil have been designed using a incompressible computational code (INS2D). The design was to provide high maximum-lift values while maintaining attached flow on the single-segment flap at landing conditions. The performance of the new NASA research airfoil is compared to a similar reference high-lift airfoil. On the new high-lift airfoil the effects of Reynolds number on slat and flap rigging have been studied experimentally, as well as the Mach number effects. The performance trend of the high-lift design is comparable to that predicted by INS2D over much of the angle-of-attack range. However, the code did not accurately predict the airfoil performance or the configuration-based trends near maximum lift where the compressibility effect could play a major role.

  12. KSC-04PD-2220

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. KSC Employees stop by the American Red Cross exhibit during Spaceport Super Safety and Health Day. The event included guest speakers Dr. Pamela Peeke, Navy Com. Stephen E. Iwanowicz, NASAs Dr. Kristine Calderon and Olympic-great Bruce Jenner. In addition, many vendors exhibits were on display for employees. Super Safety and Health Day was initiated at KSC in 1998 to increase awareness of the importance of safety and health among the government and contractor workforce. The theme for this years event was Safety and Health: A Winning Combination.

  13. KSC-04PD-2219

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. KSC employees learn about a mechanical robot displayed at an exhibit during Spaceport Super Safety and Health Day. The event included guest speakers Dr. Pamela Peeke, Navy Com. Stephen E. Iwanowicz, NASAs Dr. Kristine Calderon and Olympic-great Bruce Jenner. In addition, many vendors exhibits were on display for employees. Super Safety and Health Day was initiated at KSC in 1998 to increase awareness of the importance of safety and health among the government and contractor workforce. The theme for this years event was Safety and Health: A Winning Combination.

  14. KSC-04PD-1315

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Jack Legere, NASA Quality Assurance specialist for the Shuttle Program, displays the Stanley Cup to employees in the Orbiter Processing Facility. Behind him is Discovery. Jay Feaster, general manager of the National Hockey League 2004 Champions Tampa Bay Lightning, brought the cup to KSC while on a tour. The cup was also briefly available for viewing by employees in the KSC Training Auditorium. The Stanley Cup weighs 35 pounds and is more than 100 years old. The Lightning will be added to the cup in September.

  15. KSC-04PD-0762

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Deputy Secretary of the Treasury Samuel W. Bodman remarks on the design of the new Florida quarter at its launch ceremony. Sharing the stage with him at the KSC Visitor Complex are, from left, Florida Gov. Jeb Bush, U.S. Mint Director Henrietta Holsman Fore, NASA Administrator Sean O'Keefe and KSC Director James W. Kennedy. The quarter celebrates Florida as the gateway to discovery -- a destination for explorers in the past, a launch site for space explorers of the future, and an inviting place for visitors today.

  16. KSC-04pd0762

    NASA Image and Video Library

    2004-04-07

    KENNEDY SPACE CENTER, FLA. -- Deputy Secretary of the Treasury Samuel W. Bodman remarks on the design of the new Florida quarter at its launch ceremony. Sharing the stage with him at the KSC Visitor Complex are, from left, Florida Gov. Jeb Bush, U.S. Mint Director Henrietta Holsman Fore, NASA Administrator Sean O'Keefe and KSC Director James W. Kennedy. The quarter celebrates Florida as the gateway to discovery -- a destination for explorers in the past, a launch site for space explorers of the future, and an inviting place for visitors today.

  17. KSC-99pp1061

    NASA Image and Video Library

    1999-08-23

    A worker takes a measurement for construction of the Reusable Launch Vehicle (RLV) complex at KSC. Located near the Shuttle Landing Facility, the complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000

  18. KSC-99pp1062

    NASA Image and Video Library

    1999-08-23

    At the construction site of the Reusable Launch Vehicle (RLV) complex at KSC, a worker takes a measurement. Located near the Shuttle Landing Facility, the complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000

  19. KSC-99pp1060

    NASA Image and Video Library

    1999-08-23

    Construction is under way for the X-33/X-34 hangar complex near the Shuttle Landing Facility at KSC. The Reusable Launch Vehicle (RLV) complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000

  20. KSC01padig108

    NASA Image and Video Library

    2001-03-02

    Student teams and spectators look over the playing field and listen to instructions about the competition at the NASA/KSC FIRST Southeastern Regional event held March 1-3, 2001. FIRST (For Inspiration and Recognition of Science and Technology) events are held nationwide, pitting robots against each other and the clock on a playing field. Many teams are sponsored by corporations and academic institutions. There are 27 teams throughout the State of Florida who are competing. KSC, which sponsors nine teams, has held the regional event for two years

  1. KSC01padig097

    NASA Image and Video Library

    2001-03-01

    Students from Plantation, Fla., and their mentors prepare their team robot to compete in the  NASA/KSC FIRST Southeastern Regional event. FIRST (For Inspiration and Recognition of Science and Technology) events are held nationwide, pitting the student-built robots against each other and the clock on a playing field.  Many teams are sponsored by corporations, such as Motorola seen on these students’ shirts, and academic institutions. There are 27 teams throughout the State of Florida who are competing.  KSC, which sponsors nine teams, has held the regional event for two years.

  2. KSC01padig110

    NASA Image and Video Library

    2001-03-02

    The student team Viking Electros, from W.M. Raines High School, Jacksonville, Fla., relaxes between heats at the NASA/KSC FIRST Southeastern Regional event held March 1-3, 2001. FIRST (For Inspiration and Recognition of Science and Technology) events are held nationwide, pitting robots against each other and the clock on a playing field. Many teams are sponsored by corporations and academic institutions. There are 27 teams throughout the State of Florida who are competing. KSC, which sponsors nine teams, has held the regional event for two years

  3. KSC-04PD-2222

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. KSC employees stop at a table with a display of juices during Spaceport Super Safety and Health Day. The event included guest speakers Dr. Pamela Peeke, Navy Com. Stephen E. Iwanowicz, NASAs Dr. Kristine Calderon and Olympic- great Bruce Jenner. In addition, many vendors exhibits were on display for employees. Super Safety and Health Day was initiated at KSC in 1998 to increase awareness of the importance of safety and health among the government and contractor workforce. The theme for this years event was Safety and Health: A Winning Combination.

  4. KSC-03PD-2406

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. Japanese girls from Urawa Daiichi Girls High School, Urawa, Japan, pose for a group photo during a visit to the Orbiter Processing Facility. They were awarded the trip to Kennedy Space Center when their experiments were chosen to fly on mission STS-107. The girls are accompanied by American students from Melbourne and Jacksonville, Fla. The National Space Development Agency of Japan (NASDA) and the KSC International Space Station/Payload Processing Directorate worked with the NASA KSC Education Programs and University Research Division to coordinate the students visit.

  5. KSC-03PD-2405

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. Japanese girls from Urawa Daiichi Girls High School, Urawa, Japan, pose for a group photo during a visit to the Space Station Processing Facility. They were awarded the trip to Kennedy Space Center when their experiments were chosen to fly on mission STS-107. The girls are accompanied by American students from Melbourne and Jacksonville, Fla. The National Space Development Agency of Japan (NASDA) and the KSC International Space Station/Payload Processing Directorate worked with the NASA KSC Education Programs and University Research Division to coordinate the students visit.

  6. KSC-04PD-0961

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. A green sea turtle that was rescued at KSC in January 2003 and rehabilitated at the Clearwater Aquarium is being released back into its environment at Mosquito Lagoon at KSC. It has been fitted with a sonic tracking device. This turtle is one of three that were found stunned, impacted by the unseasonal cold temperatures experienced in Central Florida.

  7. KSC-04pd0961

    NASA Image and Video Library

    2004-04-26

    KENNEDY SPACE CENTER, FLA. - A green sea turtle that was rescued at KSC in January 2003 and rehabilitated at the Clearwater Aquarium is being released back into its environment at Mosquito Lagoon at KSC. It has been fitted with a sonic tracking device. This turtle is one of three that were found stunned, impacted by the unseasonal cold temperatures experienced in Central Florida.

  8. KSC-00pp0315

    NASA Image and Video Library

    2000-03-09

    Team 393 from Morristown, Ind., sets up its robot on a table to prepare it for the FIRST (For Inspiration and Recognition of Science and Technology) Southeast Regional competition March 9-11 at the KSC Visitor Complex. KSC is co-sponsoring the team, The Bee Bots, from Morristown Junior and Senior High Schools. On the floor at right is team 386, known as Voltage: The South Brevard First Team. This team is made up of students from Eau Gallie, Satellite, Palm Bay, Melbourne, Bayside and Melbourne Central Catholic High Schools. They are sponsored by KSC as well as Harris Corp., Intersil Corp., Interface & Control Systems. Inc. and Rockwell Collins. Teams of high school students are testing the limits of their imagination using robots they have designed, with the support of business and engineering professionals and corporate sponsors, to compete in a technological battle against other schools' robots. Of the 30 high school teams competing at KSC, 16 are Florida teams co-sponsored by NASA and KSC contractors. Local high schools participating are Astronaut, Bayside, Cocoa Beach, Eau Gallie, Melbourne, Melbourne Central Catholic, Palm Bay, Rockledge, Satellite, and Titusville

  9. KSC00pp0315

    NASA Image and Video Library

    2000-03-09

    Team 393 from Morristown, Ind., sets up its robot on a table to prepare it for the FIRST (For Inspiration and Recognition of Science and Technology) Southeast Regional competition March 9-11 at the KSC Visitor Complex. KSC is co-sponsoring the team, The Bee Bots, from Morristown Junior and Senior High Schools. On the floor at right is team 386, known as Voltage: The South Brevard First Team. This team is made up of students from Eau Gallie, Satellite, Palm Bay, Melbourne, Bayside and Melbourne Central Catholic High Schools. They are sponsored by KSC as well as Harris Corp., Intersil Corp., Interface & Control Systems. Inc. and Rockwell Collins. Teams of high school students are testing the limits of their imagination using robots they have designed, with the support of business and engineering professionals and corporate sponsors, to compete in a technological battle against other schools' robots. Of the 30 high school teams competing at KSC, 16 are Florida teams co-sponsored by NASA and KSC contractors. Local high schools participating are Astronaut, Bayside, Cocoa Beach, Eau Gallie, Melbourne, Melbourne Central Catholic, Palm Bay, Rockledge, Satellite, and Titusville

  10. Super Safety and Health Day at KSC

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Employees take a look at this NASCAR auto being displayed during Super Safety and Health Day at KSC. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is '''Safety and Health First.''' KSC's number one goal is to '''Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.'''

  11. Super Safety and Health Day at KSC

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Center Director Roy Bridges talks to workers outside the Hazardous Maintenance Facility during Super Safety and Health Day at KSC. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is '''Safety and Health First.''' KSC's number one goal is to '''Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.'''

  12. Super Safety and Health Day at KSC

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Employees gather around a demonstration by Florida Power and Light during Super Safety and Health Day at KSC. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health- and safety-related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is '''Safety and Health First.''' KSC's number one goal is to '''Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.'''

  13. Super Safety and Health Day at KSC

    NASA Technical Reports Server (NTRS)

    2000-01-01

    In an exhibit tent during Super Safety and Health Day at KSC, employees sample iced tea from a vendor. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health- and safety-related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is '''Safety and Health First.''' KSC's number one goal is to '''Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.'''

  14. KSC-03PD-3240

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, United Space Alliance (USA) Director of Orbiter Operations Patty Stratton, and NASA Space Shuttle Program Manager William Parsons view the underside of Shuttle Discovery in Orbiter Processing Facility Bay 3. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  15. KSC-08pd2387

    NASA Image and Video Library

    2008-08-12

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, technicians monitor the lifting of the Soft Capture Mechanism (SCM), part of the Soft Capture and Rendezvous System, or SCRS, from its shipping container. The SCRS will enable the future rendezvous, capture and safe disposal of Hubble by either a crewed or robotic mission. The ring-like device attaches to Hubble’s aft bulkhead. The SCRS greatly increases the current shuttle capture interfaces on Hubble, therefore significantly reducing the rendezvous and capture design complexities associated with the disposal mission. The SCRS comprises the Soft Capture Mechanism system and the Relative Navigation System and is part of the payload on the fifth and final Hubble servicing mission, STS-125, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  16. KSC-07pd1499

    NASA Image and Video Library

    2007-06-13

    KENNEDY SPACE CENTER, FLA. -- United Space Alliance employees prepare test articles to be used in wind tunnel testing by NASA to collect data for analysis of the detached Flexible Insulation Blanket, or FIB, on Atlantis. A tear occurred in an area of the OMS pod on Atlantis during launch of mission STS-117 on June 8, 2007. The test articles each feature three tiles (Low Temperature Reusable Surface Insulation, or LRSI) affixed next to two FIB blankets, simulating the thermal protection system set-up on Atlantis' OMS pod in the vicinity of the in-flight anomaly. These test articles will be flown to Texas the morning of June 14. The TPS team at KSC has also provided a total of 22 FIB samples for other testing and analysis. Repair is under consideration following testing at KSC and Houston. Photo credit: NASA/Amanda Diller

  17. KSC-07pd1498

    NASA Image and Video Library

    2007-06-13

    KENNEDY SPACE CENTER, FLA. -- United Space Alliance employees prepare test articles to be used in wind tunnel testing by NASA to collect data for analysis of the detached Flexible Insulation Blanket, or FIB, on Atlantis. A tear occurred in an area of the OMS pod on Atlantis during launch of mission STS-117 on June 8, 2007. The test articles each feature three tiles (Low Temperature Reusable Surface Insulation, or LRSI) affixed next to two FIB blankets, simulating the thermal protection system set-up on Atlantis' OMS pod in the vicinity of the in-flight anomaly. These test articles will be flown to Texas the morning of June 14. The TPS team at KSC has also provided a total of 22 FIB samples for other testing and analysis. Repair is under consideration following testing at KSC and Houston. Photo credit: NASA/Amanda Diller

  18. KSC-07pd1497

    NASA Image and Video Library

    2007-06-13

    KENNEDY SPACE CENTER, FLA. -- United Space Alliance employees prepare test articles to be used in wind tunnel testing by NASA to collect data for analysis of the detached Flexible Insulation Blanket, or FIB, on Atlantis. A tear occurred in an area of the OMS pod on Atlantis during launch of mission STS-117 on June 8, 2007. The test articles each feature three tiles (Low Temperature Reusable Surface Insulation, or LRSI) affixed next to two FIB blankets, simulating the thermal protection system set-up on Atlantis' OMS pod in the vicinity of the in-flight anomaly. These test articles will be flown to Texas the morning of June 14. The TPS team at KSC has also provided a total of 22 FIB samples for other testing and analysis. Repair is under consideration following testing at KSC and Houston. Photo credit: NASA/Amanda Diller

  19. KSC-07pd1501

    NASA Image and Video Library

    2007-06-13

    KENNEDY SPACE CENTER, FLA. -- United Space Alliance employees prepare test articles to be used in wind tunnel testing by NASA to collect data for analysis of the detached Flexible Insulation Blanket, or FIB, on Atlantis. A tear occurred in an area of the OMS pod on Atlantis during launch of mission STS-117 on June 8, 2007. The test articles each feature three tiles (Low Temperature Reusable Surface Insulation, or LRSI) affixed next to two FIB blankets, simulating the thermal protection system set-up on Atlantis' OMS pod in the vicinity of the in-flight anomaly. These test articles will be flown to Texas the morning of June 14. The TPS team at KSC has also provided a total of 22 FIB samples for other testing and analysis. Repair is under consideration following testing at KSC and Houston. Photo credit: NASA/Amanda Diller

  20. KSC-07pd1500

    NASA Image and Video Library

    2007-06-13

    KENNEDY SPACE CENTER, FLA. -- United Space Alliance employees prepare test articles to be used in wind tunnel testing by NASA to collect data for analysis of the detached Flexible Insulation Blanket, or FIB, on Atlantis. A tear occurred in an area of the OMS pod on Atlantis during launch of mission STS-117 on June 8, 2007. The test articles each feature three tiles (Low Temperature Reusable Surface Insulation, or LRSI) affixed next to two FIB blankets, simulating the thermal protection system set-up on Atlantis' OMS pod in the vicinity of the in-flight anomaly. These test articles will be flown to Texas the morning of June 14. The TPS team at KSC has also provided a total of 22 FIB samples for other testing and analysis. Repair is under consideration following testing at KSC and Houston. Photo credit: NASA/Amanda Diller

  1. KSC-04pd1151

    NASA Image and Video Library

    2004-05-14

    KENNEDY SPACE CENTER, FLA. -- During a visit to Howard A. Doolin Middle School, Miami, Fla., Center Director Jim Kennedy and other NASA and KSC representatives are greeted by students on stage. From left to right, are Jim Gerard, Aerospace Education Services Program (AESP) representative; Steve Lewis, assistant to Kennedy; Amber Marek, with KSC External Relations; David Wolf, astronaut; Kennedy; Les Gold, AESP representative; Burdette Brown; and Patricia Leonard and Clarence Bostic, Education Programs and University Research Division. Doolin Middle School is one of 100 to take part in the NASA Explorer Schools program. Kennedy is talking with students, the next generation of explorers, about our destiny as explorers, NASA’s stepping stone approach to exploring Earth, the Moon, Mars and beyond, how space impacts our lives, and how people and machines rely on each other in space.

  2. KSC-04pd1152

    NASA Image and Video Library

    2004-05-14

    KENNEDY SPACE CENTER, FLA. -- During a visit to Howard A. Doolin Middle School, Miami, Fla., Center Director Jim Kennedy and other NASA and KSC representatives are greeted by students on stage. From left to right are Jim Gerard, Aerospace Education Services Program representative; Steve Lewis, assistant to Kennedy; Amber Marek, with KSC External Relations; David Wolf, astronaut; Kennedy; Les Gold, AESP representative; Burdette Brown; and Patricia Leonard and Clarence Bostic, Education Programs and University Research Division. Doolin Middle School is one of 100 to take part in the NASA Explorer Schools program. Kennedy is talking with students, the next generation of explorers, about our destiny as explorers, NASA’s stepping stone approach to exploring Earth, the Moon, Mars and beyond, how space impacts our lives, and how people and machines rely on each other in space.

  3. KSC-04pd1153

    NASA Image and Video Library

    2004-05-14

    KENNEDY SPACE CENTER, FLA. -- During a visit to Howard A. Doolin Middle School, Miami, Fla., Center Director Jim Kennedy and other NASA and KSC representatives applaud faculty and students from the stage. From left to right are Jim Gerard, Aerospace Education Services Program (AESP) representative; Steve Lewis, assistant to Kennedy; Amber Marek, with KSC External Relations; David Wolf, astronaut; Kennedy; Les Gold, AESP representative; Burdette Brown; and Patricia Leonard and Clarence Bostic, Education Programs and University Research Division. Doolin Middle School is one of 100 to take part in the NASA Explorer Schools program. Kennedy is talking with students, the next generation of explorers, about our destiny as explorers, NASA’s stepping stone approach to exploring Earth, the Moon, Mars and beyond, how space impacts our lives, and how people and machines rely on each other in space.

  4. KSC-04pd1150

    NASA Image and Video Library

    2004-05-14

    KENNEDY SPACE CENTER, FLA. -- During a visit to Howard A. Doolin Middle School, Miami, Fla., Center Director Jim Kennedy (shaking hands, center) and other NASA and KSC representatives are greeted by students on stage. With Kennedy on stage are (left to right), Jim Gerard, Aerospace Education Services Program (AESP) representative; Steve Lewis, assistant to Kennedy; Amber Marek, with KSC External Relations; David Wolf, astronaut; Kennedy; Les Gold, AESP representative; Burdette Brown; and Patricia Leonard and Clarence Bostic, Education Programs and University Research Division. Doolin Middle School is one of 100 to take part in the NASA Explorer Schools program. Kennedy is talking with students, the next generation of explorers, about our destiny as explorers, NASA’s stepping stone approach to exploring Earth, the Moon, Mars and beyond, how space impacts our lives, and how people and machines rely on each other in space.

  5. KSC-00pp1585

    NASA Image and Video Library

    2000-10-18

    Employees at KSC look over a display of work-related shoes in an exhibit tent during Super Safety and Health Day. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  6. KSC00pp1585

    NASA Image and Video Library

    2000-10-18

    Employees at KSC look over a display of work-related shoes in an exhibit tent during Super Safety and Health Day. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  7. KSC-00pp1587

    NASA Image and Video Library

    2000-10-18

    Vendor tents and displays filled the grounds in the Industrial Area as well as LC 39 Area during Super Safety and Health Day at KSC. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  8. KSC00pp1587

    NASA Image and Video Library

    2000-10-18

    Vendor tents and displays filled the grounds in the Industrial Area as well as LC 39 Area during Super Safety and Health Day at KSC. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  9. KSC00pp1579

    NASA Image and Video Library

    2000-10-18

    In the Training Auditorium at KSC, Center Director Roy Bridges addresses attendees at a presentation for Super Safety and Health Day. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  10. KSC-00pp1579

    NASA Image and Video Library

    2000-10-18

    In the Training Auditorium at KSC, Center Director Roy Bridges addresses attendees at a presentation for Super Safety and Health Day. Safety Day is a full day of NASA-sponsored, KSC and 45th Space Wing events involving a number of health and safety related activities: Displays, vendors, technical paper sessions, panel discussions, a keynote speaker, etc. The entire Center and Wing stand down to participate in the planned events. Safety Day is held annually to proactively increase awareness in safety and health among the government and contractor workforce population. The first guiding principle at KSC is “Safety and Health First.” KSC’s number one goal is to “Assure sound, safe and efficient practices and processes are in place for privatized/commercialized launch site processing.

  11. Insulation-Testing Cryostat With Lifting Mechanism

    NASA Technical Reports Server (NTRS)

    Fesmire, James; Dokos, Adam; Scholtens, Brekke; Nagy, Zoltan; Augustynowicz, Stanislaw

    2010-01-01

    The figure depicts selected aspects of an apparatus for testing thermal-insulation materials for cryogenic systems at temperatures and under vacuum or atmospheric conditions representative of those encountered in use. This apparatus, called "Cryostat-100," is based on the established cryogen-boil-off calorimeter method, according to which the amount of heat that passes through an insulation specimen to a cryogenic fluid in a container, and thus the effective thermal conductance of the specimen, is taken to be proportional to the amount of the cryogenic fluid that boils off from the container. The design of Cryostat-100 is based partly on, and incorporates improvements over, the design of a similar prior apparatus called "Cryostat-1" described in "Improved Methods of Testing Cryogenic Insulation Materials" (KSC-12107 & KSC- 12108), NASA Tech Briefs, Vol. 24, No. 12 (December 2000), page 46. The design of Cryostat-100 also incorporates the best features of two other similar prior apparatuses called "Cryostat-2" (also described in the cited prior article) and "Cryostat- 4." Notable among the improvements in Cryostat-100 is the addition of a lifting mechanism that enables safe, rapid, reliable insertion and removal of insulation specimens and facilitates maintenance operations that involve lifting. As in Cryostat-1, the cold mass is a vertical stainless-steel cylindrical vessel subdivided into a larger measurement vessel with smaller thermal-guard vessels at both ends. During operation, all three vessels are kept filled with liquid nitrogen near saturation at ambient pressure (temperature .77.4 K). The cold mass of Cryostat-100 has a length of 1 m and diameter of 168 mm. Each specimen has a corresponding nominal length and inner diameter and a nominal thickness of 25.4 mm. Specimens that are shorter and have thicknesses between 0 and 50 mm are also acceptable. Bulk-fill, foam, clam-shell, multilayer insulation, and layered materials can be tested over a very wide range

  12. KSC-99pp1270

    NASA Image and Video Library

    1999-11-01

    Six of the KSC workers who supported recent X-34 modifications pose in front of the modified A-1A vehicle at Edwards Air Force Base, Calif. From left are Mike Lane, Roger Cartier, Dave Rowell, Mike Dininny, Bryan Taylor and James Niehoff Jr. Not shown are Kevin Boughner and Jerry Moscoso. Since September, the eight NASA engineering technicians from KSC's Engineering Prototype Lab have assisted Orbital Sciences Corporation and NASA's Dryden Flight Research Center in the complex process of converting the X-34 A-1 vehicle from captive carry status to unpowered flight status, known as A-1A. The X-34 is 58.3 feet long, 27.7 feet wide from wing tip to wing tip, and 11.5 feet tall from the bottom of the fuselage to the top of the tail. The autonomously operated technology demonstrator will be air-launched from an L-1011 airplane and should be capable of flying eight times the speed of sound, reaching an altitude of 250,000 feet. The X-34 Project is managed by NASA's Marshall Space Flight Center in Huntsville, Ala

  13. KSC01padig060

    NASA Image and Video Library

    2001-02-08

    During a signing ceremony, Ed Gormel (left), executive director of Spaceport Florida Authority, and Roy Bridges Jr., Center Director, respond to a remark from the audience. The two are signing a SERPL Real Property Use Permit Agreement between the two organizations to construct a three-mile roadway. It is the start of a construction project that includes the Space Experiment Research & Processing Laboratory (SERPL). The signing took place outdoors on S.R. 3 prior to a groundbreaking ceremony for the roadway. The road, to be known as Space Commerce Way, will serve the public by providing a 24-hour access route through KSC from S.R. 3 to the NASA Causeway and KSC Visitor Complex. The SERPL project is enabled by a partnership and collaboration between NASA and the State of Florida to create a vital resource for international and commercial space customers. SERPL is considered a magnet facility, and will support the development and processing of life sciences experiments destined for the International Space Station and accommodate NASA, industry and academic researchers performing associated biological research

  14. Corrosion Activities at the NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Heidersbach, Robert H.

    2002-01-01

    This report documents summer faculty fellow efforts in the corrosion test bed at the NASA Kennedy Space Center. During the summer of 2002 efforts were concentrated on three activities: a short course on corrosion control for KSC personnel, evaluation of commercial wash additives used for corrosion control on Army aircraft, and improvements in the testing of a new cathodic protection system under development at KSC.

  15. KSC Wildlife

    NASA Image and Video Library

    2007-02-09

    A pair of brown pelicans rest on a wall near the turn basin at NASA's Kennedy Space Center. The turn basin was carved out of the Banana River when KSC was built. The birds' habitat is sandy coastal beaches and lagoons, ranging along the Atlantic Coast from North Carolina south to Venezuela. It nests in colonies. KSC shares a boundary with the Merritt Island Wildlife Nature Refuge. The refuge is a habitat for more than 310 species of birds, 25 mammals, 117 fishes and 65 amphibians and reptiles. In addition, the Refuge supports 19 endangered or threatened wildlife species on Federal or State lists, more than any other single refuge in the U.S.

  16. KSC-2014-2067

    NASA Image and Video Library

    2014-04-13

    CAPE CANAVERAL, Fla. - Astronaut Resource Managing System team members Sam Neblett of KSC Technik Inc., left, and Roberto Ricci participate in the International Space Apps Challenge in the Center for Space Education at the Kennedy Space Center Visitor Complex in Florida. Kennedy Space Center hosted one of the over 90 locations around the world where participants congregated for the attempt to design innovative solutions for global challenges over a 48-hour period. This year's development marathon focused on five NASA mission areas: Asteroids, Earth Watch, Human Spaceflight, Robotics, and Technology in Space. Three of this year’s challenges were developed by KSC employees: Space Wearables: Fashion Designer to Astronauts, Growing Food for a Martian Table, and Asteroid Prospector. The winners selected in 2014 at Kennedy were Astronaut Resource Managing System, or ARMS, for Best Use of Data and SpaceWear for Best Use of Hardware. ARMS also took the People's Choice Award. For more information, visit https://2014.spaceappschallenge.org. Photo credit: NASA/Daniel Casper

  17. Strategic Project Management at the NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.

    2000-01-01

    This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.

  18. Atmospheric sciences program at NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Nicholson, James R.; Jafferis, William

    1988-01-01

    A very keen awareness of the impact of lightning threat on ground operations exists at NASA Kennedy Space Center (KSC) because of the high frequency of thunderstorm occurrences in Florida. The majority of thunder events occur in the summertime, initiated by solar heating of the land. Merritt Island, where KSC is located, produces its own thunderstorms under light flow conditions; because some are small, their importance might be unappreciated at first glance. The impress of these facts, and others of pertinence, on the KSC atmospheric sciences development program will be discussed, priorities enumerated, and a review of development projects presented.

  19. Review of V/STOL lift/cruise fan technology

    NASA Technical Reports Server (NTRS)

    Rolls, L. S.; Quigley, H. C.; Perkins, R. G., Jr.

    1976-01-01

    This paper presents an overview of supporting technology programs conducted to reduce the risk in the joint NASA/Navy Lift/Cruise Fan Research and Technology Aircraft Program. The aeronautical community has endeavored to combine the low-speed and lifting capabilities of the helicopter with the high-speed capabilities of the jet aircraft; recent developments have indicated a lift/cruise fan propulsion system may provide these desired characteristics. NASA and the Navy have formulated a program that will provide a research and technology aircraft to furnish viability of the lift/cruise fan aircraft through flight experiences and obtain data on designs for future naval and civil V/STOL aircraft. The supporting technology programs discussed include: (1) design studies for operational aircraft, a research and technology aircraft, and associated propulsion systems; (2) wind-tunnel tests of several configurations; (3) propulsion-system thrust vectoring tests; and (4) simulation. These supporting technology programs have indicated that a satisfactory research and technology aircraft program can be accomplished within the current level of technology.

  20. KSC-04PD-2020

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Shawn McCollough, principal of Gainesville Elementary School, a NASA Explorer School (NES) in Gainesville, Ga., and a teacher sign a Memorandum of Understanding between KSC and the school for the NES program. Schools from across the country are eligible to apply online for an opportunity to partner with NASA in a program designed to bring engaging mathematics, science and technology learning to educators, students and families.