Sample records for national electric reliability

  1. Hawaii Electric System Reliability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loose, Verne William; Silva Monroy, Cesar Augusto

    2012-08-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers’ views of reliability “worth” and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and formore » application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers’ views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.« less

  2. Hawaii electric system reliability.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silva Monroy, Cesar Augusto; Loose, Verne William

    2012-09-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and formore » application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.« less

  3. Final Report to the National Energy Technology Laboratory on FY09-FY13 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vittal, Vijay

    2015-11-04

    The Consortium for Electric Reliability Technology Solutions (CERTS) was formed in 1999 in response to a call from U.S. Congress to restart a federal transmission reliability R&D program to address concerns about the reliability of the U.S. electric power grid. CERTS is a partnership between industry, universities, national laboratories, and government agencies. It researches, develops, and disseminates new methods, tools, and technologies to protect and enhance the reliability of the U.S. electric power system and the efficiency of competitive electricity markets. It is funded by the U.S. Department of Energy’s Office of Electricity Delivery and Energy Reliability (OE). This reportmore » provides an overview of PSERC and CERTS, of the overall objectives and scope of the research, a summary of the major research accomplishments, highlights of the work done under the various elements of the NETL cooperative agreement, and brief reports written by the PSERC researchers on their accomplishments, including research results, publications, and software tools.« less

  4. CERTS: Consortium for Electric Reliability Technology Solutions - Research Highlights

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph

    2003-07-30

    Historically, the U.S. electric power industry was vertically integrated, and utilities were responsible for system planning, operations, and reliability management. As the nation moves to a competitive market structure, these functions have been disaggregated, and no single entity is responsible for reliability management. As a result, new tools, technologies, systems, and management processes are needed to manage the reliability of the electricity grid. However, a number of simultaneous trends prevent electricity market participants from pursuing development of these reliability tools: utilities are preoccupied with restructuring their businesses, research funding has declined, and the formation of Independent System Operators (ISOs) andmore » Regional Transmission Organizations (RTOs) to operate the grid means that control of transmission assets is separate from ownership of these assets; at the same time, business uncertainty, and changing regulatory policies have created a climate in which needed investment for transmission infrastructure and tools for reliability management has dried up. To address the resulting emerging gaps in reliability R&D, CERTS has undertaken much-needed public interest research on reliability technologies for the electricity grid. CERTS' vision is to: (1) Transform the electricity grid into an intelligent network that can sense and respond automatically to changing flows of power and emerging problems; (2) Enhance reliability management through market mechanisms, including transparency of real-time information on the status of the grid; (3) Empower customers to manage their energy use and reliability needs in response to real-time market price signals; and (4) Seamlessly integrate distributed technologies--including those for generation, storage, controls, and communications--to support the reliability needs of both the grid and individual customers.« less

  5. 78 FR 41339 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ...] Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards AGENCY: Federal... Reliability Standards identified by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization. FOR FURTHER INFORMATION CONTACT: Kevin Ryan (Legal Information...

  6. Electrical service reliability: the customer perspective

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Samsa, M.E.; Hub, K.A.; Krohm, G.C.

    1978-09-01

    Electric-utility-system reliability criteria have traditionally been established as a matter of utility policy or through long-term engineering practice, generally with no supportive customer cost/benefit analysis as justification. This report presents results of an initial study of the customer perspective toward electric-utility-system reliability, based on critical review of over 20 previous and ongoing efforts to quantify the customer's value of reliable electric service. A possible structure of customer classifications is suggested as a reasonable level of disaggregation for further investigation of customer value, and these groups are characterized in terms of their electricity use patterns. The values that customers assign tomore » reliability are discussed in terms of internal and external cost components. A list of options for effecting changes in customer service reliability is set forth, and some of the many policy issues that could alter customer-service reliability are identified.« less

  7. Reliability Prediction Approaches For Domestic Intelligent Electric Energy Meter Based on IEC62380

    NASA Astrophysics Data System (ADS)

    Li, Ning; Tong, Guanghua; Yang, Jincheng; Sun, Guodong; Han, Dongjun; Wang, Guixian

    2018-01-01

    The reliability of intelligent electric energy meter is a crucial issue considering its large calve application and safety of national intelligent grid. This paper developed a procedure of reliability prediction for domestic intelligent electric energy meter according to IEC62380, especially to identify the determination of model parameters combining domestic working conditions. A case study was provided to show the effectiveness and validation.

  8. 18 CFR 39.3 - Electric Reliability Organization certification.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Electric Reliability... CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.3 Electric Reliability Organization certification. (a) Any...

  9. 18 CFR 39.3 - Electric Reliability Organization certification.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Electric Reliability... CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.3 Electric Reliability Organization certification. (a) Any...

  10. 18 CFR 39.3 - Electric Reliability Organization certification.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Electric Reliability... CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.3 Electric Reliability Organization certification. (a) Any...

  11. 18 CFR 39.3 - Electric Reliability Organization certification.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Electric Reliability... CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.3 Electric Reliability Organization certification. (a) Any...

  12. 76 FR 73608 - Reliability Technical Conference, North American Electric Reliability Corporation, Public Service...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... or municipal authority play in forming your bulk power system reliability plans? b. Do you support..., North American Electric Reliability Corporation (NERC) Nick Akins, CEO of American Electric Power (AEP..., EL11-62-000] Reliability Technical Conference, North American Electric Reliability Corporation, Public...

  13. American lifelines alliance efforts to improve electric power transmission reliability

    USGS Publications Warehouse

    Nishenko, S.P.; Savage, W.U.; Honegger, D.G.; McLane, T.R.; ,

    2002-01-01

    A study was performed on American Lifelines Alliance (ALA) efforts to improve electric power transmission reliability. ALA is a public-private partnership project, with the goal of reducing risks to lifelines from natural hazards and human threat events. The mechanism used by ALA for developing national guidelines for lifeline systems is dependent upon using existing Standards Developing Organizations (SDO) accredited by the American National Standards Institute (ANSI) as means to achieve national consensus.

  14. Applying reliability analysis to design electric power systems for More-electric aircraft

    NASA Astrophysics Data System (ADS)

    Zhang, Baozhu

    The More-Electric Aircraft (MEA) is a type of aircraft that replaces conventional hydraulic and pneumatic systems with electrically powered components. These changes have significantly challenged the aircraft electric power system design. This thesis investigates how reliability analysis can be applied to automatically generate system topologies for the MEA electric power system. We first use a traditional method of reliability block diagrams to analyze the reliability level on different system topologies. We next propose a new methodology in which system topologies, constrained by a set reliability level, are automatically generated. The path-set method is used for analysis. Finally, we interface these sets of system topologies with control synthesis tools to automatically create correct-by-construction control logic for the electric power system.

  15. 18 CFR 39.3 - Electric Reliability Organization certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... operators of the Bulk-Power System, and other interested parties for improvement of the Electric Reliability... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Electric Reliability..., Reliability Standards that provide for an adequate level of reliability of the Bulk-Power System, and (2) Has...

  16. Thermal Management and Reliability of Power Electronics and Electric Machines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Narumanchi, Sreekant

    2016-09-19

    Increasing the number of electric-drive vehicles (EDVs) on America's roads has been identified as a strategy with near-term potential for dramatically decreasing the nation's dependence on oil - by the U.S. Department of Energy, the federal cross-agency EV-Everywhere Challenge, and the automotive industry. Mass-market deployment will rely on meeting aggressive technical targets, including improved efficiency and reduced size, weight, and cost. Many of these advances will depend on optimization of thermal management. Effective thermal management is critical to improving the performance and ensuring the reliability of EDVs. Efficient heat removal makes higher power densities and lower operating temperatures possible, andmore » in turn enables cost and size reductions. The National Renewable Energy Laboratory (NREL), along with DOE and industry partners is working to develop cost-effective thermal management solutions to increase device and component power densities. In this presentation, the activities in recent years related to thermal management and reliability of automotive power electronics and electric machines are presented.« less

  17. Basic Principles of Electrical Network Reliability Optimization in Liberalised Electricity Market

    NASA Astrophysics Data System (ADS)

    Oleinikova, I.; Krishans, Z.; Mutule, A.

    2008-01-01

    The authors propose to select long-term solutions to the reliability problems of electrical networks in the stage of development planning. The guide lines or basic principles of such optimization are: 1) its dynamical nature; 2) development sustainability; 3) integrated solution of the problems of network development and electricity supply reliability; 4) consideration of information uncertainty; 5) concurrent consideration of the network and generation development problems; 6) application of specialized information technologies; 7) definition of requirements for independent electricity producers. In the article, the major aspects of liberalized electricity market, its functions and tasks are reviewed, with emphasis placed on the optimization of electrical network development as a significant component of sustainable management of power systems.

  18. 75 FR 14097 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-24

    ... Commission 18 CFR Part 40 [Docket No. RM09-18-000; 130 FERC ] 61,204] Revision to Electric Reliability... Reliability Organization (ERO) to revise its definition of the term ``bulk electric system'' to include all... compliance with mandatory Reliability Standards. The Commission believes that a 100 kV threshold for...

  19. Thermal Management and Reliability of Automotive Power Electronics and Electric Machines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Narumanchi, Sreekant V; Bennion, Kevin S; Cousineau, Justine E

    Low-cost, high-performance thermal management technologies are helping meet aggressive power density, specific power, cost, and reliability targets for power electronics and electric machines. The National Renewable Energy Laboratory is working closely with numerous industry and research partners to help influence development of components that meet aggressive performance and cost targets through development and characterization of cooling technologies, and thermal characterization and improvements of passive stack materials and interfaces. Thermomechanical reliability and lifetime estimation models are important enablers for industry in cost-and time-effective design.

  20. Limited electricity access in health facilities of sub-Saharan Africa: a systematic review of data on electricity access, sources, and reliability

    PubMed Central

    Adair-Rohani, Heather; Zukor, Karen; Bonjour, Sophie; Wilburn, Susan; Kuesel, Annette C; Hebert, Ryan; Fletcher, Elaine R

    2013-01-01

    ABSTRACT Background: Access to electricity is critical to health care delivery and to the overarching goal of universal health coverage. Data on electricity access in health care facilities are rarely collected and have never been reported systematically in a multi-country study. We conducted a systematic review of available national data on electricity access in health care facilities in sub-Saharan Africa. Methods: We identified publicly-available data from nationally representative facility surveys through a systematic review of articles in PubMed, as well as through websites of development agencies, ministries of health, and national statistics bureaus. To be included in our analysis, data sets had to be collected in or after 2000, be nationally representative of a sub-Saharan African country, cover both public and private health facilities, and include a clear definition of electricity access. Results: We identified 13 health facility surveys from 11 sub-Saharan African countries that met our inclusion criteria. On average, 26% of health facilities in the surveyed countries reported no access to electricity. Only 28% of health care facilities, on average, had reliable electricity among the 8 countries reporting data. Among 9 countries, an average of 7% of facilities relied solely on a generator. Electricity access in health care facilities increased by 1.5% annually in Kenya between 2004 and 2010, and by 4% annually in Rwanda between 2001 and 2007. Conclusions: Energy access for health care facilities in sub-Saharan African countries varies considerably. An urgent need exists to improve the geographic coverage, quality, and frequency of data collection on energy access in health care facilities. Standardized tools should be used to collect data on all sources of power and supply reliability. The United Nations Secretary-General's “Sustainable Energy for All” initiative provides an opportunity to comprehensively monitor energy access in health care

  1. Final Report to the National Energy Technology Laboratory on FY14- FY15 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vittal, Vijay; Lampis, Anna Rosa

    The Power System Engineering Research Center (PSERC) engages in technological, market, and policy research for an efficient, secure, resilient, adaptable, and economic U.S. electric power system. PSERC, as a founding partner of the Consortium for Electric Reliability Technology Solutions (CERTS), conducted a multi-year program of research for U.S. Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) to develop new methods, tools, and technologies to protect and enhance the reliability and efficiency of the U.S. electric power system as competitive electricity market structures evolve, and as the grid moves toward wide-scale use of decentralized generation (such asmore » renewable energy sources) and demand-response programs. Phase I of OE’s funding for PSERC, under cooperative agreement DE-FC26-09NT43321, started in fiscal year (FY) 2009 and ended in FY2013. It was administered by DOE’s National Energy Technology Laboratory (NETL) through a cooperative agreement with Arizona State University (ASU). ASU provided sub-awards to the participating PSERC universities. This document is PSERC’s final report to NETL on the activities for OE, conducted through CERTS, from September 2015 through September 2017 utilizing FY 2014 to FY 2015 funding under cooperative agreement DE-OE0000670. PSERC is a thirteen-university consortium with over 30 industry members. Since 1996, PSERC has been engaged in research and education efforts with the mission of “empowering minds to engineer the future electric energy system.” Its work is focused on achieving: • An efficient, secure, resilient, adaptable, and economic electric power infrastructure serving society • A new generation of educated technical professionals in electric power • Knowledgeable decision-makers on critical energy policy issues • Sustained, quality university programs in electric power engineering. PSERC core research is funded by industry, with a budget supporting

  2. 77 FR 65873 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Electric Reliability Corporation; Notice of Filing Take notice that on October 12, 2012, the North American Electric Reliability Corporation (NERC) submitted a compliance filing in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in North American Electric Reliability Corporation, 140...

  3. 77 FR 32629 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... Electric Reliability Corporation; Notice of Filing Take notice that on May 14, 2012, the North American Electric Reliability Corporation (NERC) submitted a compliance filing in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in North American Electric Reliability Corporation, 138...

  4. 78 FR 18333 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Electric Reliability Corporation; Notice of Filing Take notice that on March 15, 2013, the North American Electric Reliability Corporation (NERC) submitted a compliance filing and report in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in North American Electric Reliability...

  5. 78 FR 9687 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... Electric Reliability Corporation; Notice of Filing Take notice that on February 1, 2013, the North American Electric Reliability Corporation (NERC) submitted a compliance filing in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in North American Electric Reliability Corporation, 141...

  6. 75 FR 65624 - Notice of Attendance at North American Electric Reliability Corporation Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... Electric Reliability Corporation Meetings October 19, 2010. The Federal Energy Regulatory Commission hereby... Electric Reliability Corporation meetings: NERC Board of Trustees Meeting November 3, 2010, Wednesday..., North American Electric Reliability Corporation; Docket No. RC08-5, North American Electric Reliability...

  7. 78 FR 18333 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Electric Reliability Corporation; Notice of Filing Take notice that on March 11, 2013, the North American Electric Reliability Corporation and SERC Reliability Corporation submitted a compliance filing in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in Regional Reliability...

  8. 76 FR 16263 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ...'s Reliability Standards Development Process, to revise its definition of the term ``bulk electric... definition of ``bulk electric system'' through the NERC Standards Development Process to address the... undertake the process of revising the bulk electric system definition to address the Commission's concerns...

  9. Electric system restructuring and system reliability

    NASA Astrophysics Data System (ADS)

    Horiuchi, Catherine Miller

    In 1996 the California legislature passed AB 1890, explicitly defining economic benefits and detailing specific mechanisms for initiating a partial restructuring the state's electric system. Critics have since sought re-regulation and proponents have asked for patience as the new institutions and markets take shape. Other states' electric system restructuring activities have been tempered by real and perceived problems in the California model. This study examines the reduced regulatory controls and new constraints introduced in California's limited restructuring model using utility and regulatory agency records from the 1990's to investigate effects of new institutions and practices on system reliability for the state's five largest public and private utilities. Logit and negative binomial regressions indicate negative impact from the California model of restructuring on system reliability as measured by customer interruptions. Time series analysis of outage data could not predict the wholesale power market collapse and the subsequent rolling blackouts in early 2001; inclusion of near-outage reliability disturbances---load shedding and energy emergencies---provided a measure of forewarning. Analysis of system disruptions, generation capacity and demand, and the role of purchased power challenge conventional wisdom on the causality of Californian's power problems. The quantitative analysis was supplemented by a targeted survey of electric system restructuring participants. Findings suggest each utility and the organization controlling the state's electric grid provided protection from power outages comparable to pre-restructuring operations through 2000; however, this reliability has come at an inflated cost, resulting in reduced system purchases and decreased marginal protection. The historic margin of operating safety has fully eroded, increasing mandatory load shedding and emergency declarations for voluntary and mandatory conservation. Proposed remedies focused

  10. 75 FR 81601 - North American Electric Reliability Corporation; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... Electric Reliability Corporation; Notice of Compliance Filing December 20, 2010. Take notice that on December 1, 2010, North American Electric Reliability Corporation, in response to Paragraph 274 of the... Transfer Capability Reliability Standards. \\1\\ Mandatory Reliability Standards for the Calculation of...

  11. Reliability in Cross-National Content Analysis.

    ERIC Educational Resources Information Center

    Peter, Jochen; Lauf, Edmund

    2002-01-01

    Investigates how coder characteristics such as language skills, political knowledge, coding experience, and coding certainty affected inter-coder and coder-training reliability. Shows that language skills influenced both reliability types. Suggests that cross-national researchers should pay more attention to cross-national assessments of…

  12. Evaluating North American Electric Grid Reliability Using the Barabasi-Albert Network Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chassin, David P.; Posse, Christian

    2005-09-15

    The reliability of electric transmission systems is examined using a scale-free model of network topology and failure propagation. The topologies of the North American eastern and western electric grids are analyzed to estimate their reliability based on the Barabási-Albert network model. A commonly used power system reliability index is computed using a simple failure propagation model. The results are compared to the values of power system reliability indices previously obtained using other methods and they suggest that scale-free network models are usable to estimate aggregate electric grid reliability.

  13. Evaluating North American Electric Grid Reliability Using the Barabasi-Albert Network Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chassin, David P.; Posse, Christian

    2005-09-15

    The reliability of electric transmission systems is examined using a scale-free model of network topology and failure propagation. The topologies of the North American eastern and western electric grids are analyzed to estimate their reliability based on the Barabasi-Albert network model. A commonly used power system reliability index is computed using a simple failure propagation model. The results are compared to the values of power system reliability indices previously obtained using standard power engineering methods, and they suggest that scale-free network models are usable to estimate aggregate electric grid reliability.

  14. Bulk electric system reliability evaluation incorporating wind power and demand side management

    NASA Astrophysics Data System (ADS)

    Huang, Dange

    Electric power systems are experiencing dramatic changes with respect to structure, operation and regulation and are facing increasing pressure due to environmental and societal constraints. Bulk electric system reliability is an important consideration in power system planning, design and operation particularly in the new competitive environment. A wide range of methods have been developed to perform bulk electric system reliability evaluation. Theoretically, sequential Monte Carlo simulation can include all aspects and contingencies in a power system and can be used to produce an informative set of reliability indices. It has become a practical and viable tool for large system reliability assessment technique due to the development of computing power and is used in the studies described in this thesis. The well-being approach used in this research provides the opportunity to integrate an accepted deterministic criterion into a probabilistic framework. This research work includes the investigation of important factors that impact bulk electric system adequacy evaluation and security constrained adequacy assessment using the well-being analysis framework. Load forecast uncertainty is an important consideration in an electrical power system. This research includes load forecast uncertainty considerations in bulk electric system reliability assessment and the effects on system, load point and well-being indices and reliability index probability distributions are examined. There has been increasing worldwide interest in the utilization of wind power as a renewable energy source over the last two decades due to enhanced public awareness of the environment. Increasing penetration of wind power has significant impacts on power system reliability, and security analyses become more uncertain due to the unpredictable nature of wind power. The effects of wind power additions in generating and bulk electric system reliability assessment considering site wind speed

  15. A fuzzy set approach for reliability calculation of valve controlling electric actuators

    NASA Astrophysics Data System (ADS)

    Karmachev, D. P.; Yefremov, A. A.; Luneva, E. E.

    2017-02-01

    The oil and gas equipment and electric actuators in particular frequently perform in various operational modes and under dynamic environmental conditions. These factors affect equipment reliability measures in a vague, uncertain way. To eliminate the ambiguity, reliability model parameters could be defined as fuzzy numbers. We suggest a technique that allows constructing fundamental fuzzy-valued performance reliability measures based on an analysis of electric actuators failure data in accordance with the amount of work, completed before the failure, instead of failure time. Also, this paper provides a computation example of fuzzy-valued reliability and hazard rate functions, assuming Kumaraswamy complementary Weibull geometric distribution as a lifetime (reliability) model for electric actuators.

  16. 76 FR 62802 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. RC11-6-000] North American Electric Reliability Corporation; Notice of Filing Take notice that on September 30, 2011, the North American Electric Reliability Corporation (NERC) filed a petition requesting Federal Energy Regulatory...

  17. 77 FR 44610 - Notice of Filing; North American Electric Reliability Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RC08-5-003] Notice of Filing; North American Electric Reliability Corporation Take notice that on July 18, 2012, North American Electric Reliability Corporation (NERC) submitted a filing to comply with the Commission's directive in its...

  18. 75 FR 4374 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM06-22-011] North American Electric Reliability Corporation; Notice of Filing January 20, 2010. Take notice that on January 19, 2010, North American Electric Reliability Corporation (NERC) filed additional information that will allow the...

  19. 77 FR 45598 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. RM06-16-000] North American Electric Reliability Corporation; Notice of Filing Take notice that on March 16, 2012, the North American Electric Reliability Corporation (NERC) submitted a filing proposing to amend the NERC Glossary Definition...

  20. Metroliner Auxiliary Power Electrical System Reliability Study

    DOT National Transportation Integrated Search

    1971-06-01

    The reliability of the electrical system of any vehicle is greatly affected by the way the system is configured. The propulsion and braking systems of a train must be unaffected by failures occurring in the nonessential power areas. With these criter...

  1. 77 FR 59745 - Delegation of Authority Regarding Electric Reliability Organization's Budget, Delegation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ...; Order No. 766] Delegation of Authority Regarding Electric Reliability Organization's Budget, Delegation... Electric Reliability Organization (ERO) filings. In particular, this Final Rule transfers delegated... delegation agreements, and ERO policies and procedures. DATES: This rule is effective October 1, 2012. FOR...

  2. Durability, value, and reliability of selected electric powered wheelchairs.

    PubMed

    Fass, Megan V; Cooper, Rory A; Fitzgerald, Shirley G; Schmeler, Mark; Boninger, Michael L; Algood, S David; Ammer, William A; Rentschler, Andrew J; Duncan, John

    2004-05-01

    To compare the durability, value, and reliability of selected electric powered wheelchairs (EPWs), purchased in 1998. Engineering standards tests of quality and performance. A rehabilitation engineering center. Fifteen EPWs: 3 each of the Jazzy, Quickie, Lancer, Arrow, and Chairman models. Not applicable. Wheelchairs were evaluated for durability (lifespan), value (durability, cost), and reliability (rate of repairs) using 2-drum and curb-drop machines in accordance with the standards of the American National Standards Institute and Rehabilitation Engineering and Assistive Technology Society of North America. The 5 brands differed significantly (Preliability, except in terms of reliability of supplier repairs. The Arrow had the highest durability, value, and reliability in terms of the number of consumer failures, supplier failures, repairs, failures, consumer repairs and failures, and supplier repairs and failures. The Lancer had the poorest durability and reliability, and the Chairman had the lowest value. K0014 wheelchairs (Arrow, Permobil) were significantly more durable than K0011 wheelchairs (Jazzy, Quickie, Lancer). No significant differences in durability with respect to rear-wheel-drive (Arrow, Lancer, Quickie), mid-wheel-drive (Jazzy), or front-wheel-drive (Chairman) wheelchairs were found. The Arrow consistently outperformed the other wheelchairs in nearly every area studied, and K0014 wheelchairs were more durable than K0011 wheelchairs. These results can be used as an objective comparison guide for clinicians and consumers, as long as they are used in conjunction with other important selection criteria. Manufacturers can use these results as a guide for continued efforts to produce higher quality wheelchairs. Care should be taken when making comparisons, however, because the 5 brands had different features. Purchased in 1998, these models may be used for several more years. In addition, problem areas in these models

  3. 75 FR 67960 - North American Electric Reliability Corporation; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. RM06-16-011] North American Electric Reliability Corporation; Notice of Compliance Filing October 28, 2010. Take notice that on October 25, 2010, the North American Electric Reliability Corporation (NERC), submitted a compliance filing...

  4. Cultured Construction: Global Evidence of the Impact of National Values on Renewable Electricity Infrastructure Choice.

    PubMed

    Kaminsky, Jessica A

    2016-02-16

    Renewable electricity is an important tool in the fight against climate change, but globally these technologies are still in the early stages of diffusion. To contribute to our understanding of the factors driving this diffusion, I study relationships between national values (measured by Hofstede's cultural dimensions) and renewable electricity adoption at the national level. Existing data for 66 nations (representing an equal number of developed and developing economies) are used to fuel the analysis. Somewhat dependent on limited available data on controls for grid reliability and the cost of electricity, I discover that three of Hofstede's dimensions (high uncertainty avoidance, low masculinity-femininity, and high individualism-collectivism) have significant exponential relationships with renewable electricity adoption. The dimension of uncertainty avoidance appears particularly appropriate for practical application. Projects or organizations implementing renewable electricity policy, designs, or construction should particularly attend to this cultural dimension. In particular, as the data imply that renewable technologies are being used to manage risk in electricity supply, geographies with unreliable grids are particularly likely to be open to renewable electricity technologies.

  5. Electric service reliability cost/worth assessment in a developing country

    NASA Astrophysics Data System (ADS)

    Pandey, Mohan Kumar

    Considerable work has been done in developed countries to optimize the reliability of electric power systems on the basis of reliability cost versus reliability worth. This has yet to be considered in most developing countries, where development plans are still based on traditional deterministic measures. The difficulty with these criteria is that they cannot be used to evaluate the economic impacts of changing reliability levels on the utility and the customers, and therefore cannot lead to an optimum expansion plan for the system. The critical issue today faced by most developing countries is that the demand for electric power is high and growth in supply is constrained by technical, environmental, and most importantly by financial impediments. Many power projects are being canceled or postponed due to a lack of resources. The investment burden associated with the electric power sector has already led some developing countries into serious debt problems. This thesis focuses on power sector issues facing by developing countries and illustrates how a basic reliability cost/worth approach can be used in a developing country to determine appropriate planning criteria and justify future power projects by application to the Nepal Integrated Electric Power System (NPS). A reliability cost/worth based system evaluation framework is proposed in this thesis. Customer surveys conducted throughout Nepal using in-person interviews with approximately 2000 sample customers are presented. The survey results indicate that the interruption cost is dependent on both customer and interruption characteristics, and it varies from one location or region to another. Assessments at both the generation and composite system levels have been performed using the customer cost data and the developed NPS reliability database. The results clearly indicate the implications of service reliability to the electricity consumers of Nepal, and show that the reliability cost/worth evaluation is both

  6. Reliability and economy -- Hydro electricity for Iran

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jahromi-Shirazi, M.J.; Zarbakhsh, M.H.

    1998-12-31

    Reliability is the probability that a device or system will perform its function adequately, for the period of time intended, under the operating conditions intended. Reliability and economy are two important factors in operating any system, especially in power generation. Due to the high rate in population growth in Iran, the experts have estimated that the demand for electricity will be about 63,000 MW in the next 25 years, the installed power is now about 26,000 MW. Therefore, the energy policy decision made in Iran is to go to power generation by hydroelectric plants because of reliability, availability of watermore » resources and the economics of hydroelectric power.« less

  7. 78 FR 803 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ...In this Final Rule, pursuant to section 215 of the Federal Power Act, the Federal Energy Regulatory Commission (Commission) approves modifications to the currently-effective definition of ``bulk electric system'' developed by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization. The Commission finds that the modified definition of ``bulk electric system'' removes language allowing for regional discretion in the currently-effective bulk electric system definition and establishes a bright-line threshold that includes all facilities operated at or above 100 kV. The modified definition also identifies specific categories of facilities and configurations as inclusions and exclusions to provide clarity in the definition of ``bulk electric system.'' In this Final Rule, the Commission also approves: NERC's revisions to its Rules of Procedure, which create an exception process to add elements to, or remove elements from, the definition of ``bulk electric system'' on a case-by-case basis; NERC's form entitled ``Detailed Information To Support an Exception Request'' that entities will use to support requests for exception from the ``bulk electric system'' definition; and NERC's implementation plan for the revised ``bulk electric system'' definition.

  8. Scoping study on trends in the economic value of electricity reliability to the U.S. economy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph; Koomey, Jonathan; Lehman, Bryan

    During the past three years, working with more than 150 organizations representing public and private stakeholders, EPRI has developed the Electricity Technology Roadmap. The Roadmap identifies several major strategic challenges that must be successfully addressed to ensure a sustainable future in which electricity continues to play an important role in economic growth. Articulation of these anticipated trends and challenges requires a detailed understanding of the role and importance of reliable electricity in different sectors of the economy. This report is intended to contribute to that understanding by analyzing key aspects of trends in the economic value of electricity reliability inmore » the U.S. economy. We first present a review of recent literature on electricity reliability costs. Next, we describe three distinct end-use approaches for tracking trends in reliability needs: (1) an analysis of the electricity-use requirements of office equipment in different commercial sectors; (2) an examination of the use of aggregate statistical indicators of industrial electricity use and economic activity to identify high reliability-requirement customer market segments; and (3) a case study of cleanrooms, which is a cross-cutting market segment known to have high reliability requirements. Finally, we present insurance industry perspectives on electricity reliability as an example of a financial tool for addressing customers' reliability needs.« less

  9. The Challenge Posed by Geomagnetic Activity to Electric Power Reliability: Evidence From England and Wales

    NASA Astrophysics Data System (ADS)

    Forbes, Kevin F.; St. Cyr, O. C.

    2017-10-01

    This paper addresses whether geomagnetic activity challenged the reliability of the electric power system during part of the declining phase of solar cycle 23. Operations by National Grid in England and Wales are examined over the period of 11 March 2003 through 31 March 2005. This paper examines the relationship between measures of geomagnetic activity and a metric of challenged electric power reliability known as the net imbalance volume (NIV). Measured in megawatt hours, NIV represents the sum of all energy deployments initiated by the system operator to balance the electric power system. The relationship between geomagnetic activity and NIV is assessed using a multivariate econometric model. The model was estimated using half-hour settlement data over the period of 11 March 2003 through 31 December 2004. The results indicate that geomagnetic activity had a demonstrable effect on NIV over the sample period. Based on the parameter estimates, out-of-sample predictions of NIV were generated for each half hour over the period of 1 January to 31 March 2005. Consistent with the existence of a causal relationship between geomagnetic activity and the electricity market imbalance, the root-mean-square error of the out-of-sample predictions of NIV is smaller; that is, the predictions are more accurate, when the statistically significant estimated effects of geomagnetic activity are included as drivers in the predictions.

  10. Reliability of solid-state lighting electrical drivers subjected to WHTOL accelerated aging

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lall, Pradeep; Sakalauku, Peter; Davis, Lynn

    An investigation of a solid-state lighting (SSL) luminaire with the focus on the electronic driver which has been exposed to a standard wet hot temperature operating life (WHTOL) of 85% RH and 85°C in order to assess reliability of prolonged exposer to a harsh environment has been conducted. SSL luminaires are beginning introduced as head lamps in some of today's luxury automobiles and may also be fulfilling a variety of important outdoor applications such as overhead street lamps, traffic signals and landscape lighting. SSL luminaires in these environments are almost certain to encounter excessive moisture from humidity and high temperaturesmore » for a persistent period of time. The lack of accelerated test methods for LEDs to assess long-term reliability prior to introduction into the marketplace, a need for SSL physics based PHM modeling indicators for assessment and prediction of LED life, as well as the U.S. Department of Energy's R&D roadmap to replace todays lighting with SSL luminaires makes it important to increase the understanding of the reliability of SSL devices, specifically, in harsh environment applications. In this work, a set of SSL electrical drivers were investigated to determine failure mechanisms that occur during prolonged harsh environment applications. Each driver consists of four aluminum electrolytic capacitors (AECs) of three different types and was considered the weakest component inside the SSL electrical driver. The reliability of the electrical driver was assessed by monitoring the change in capacitance and the change in equivalent series resistance for each AEC, as well as monitoring the luminous flux of the SSL luminaire or the output of the electrical driver. The luminous flux of a pristine SSL electrical driver was also monitored in order to detect minute changes in the electrical drivers output and to aid in the investigation of the SSL luminaires reliability. The failure mechanisms of the electrical drivers have been

  11. 18 CFR 39.10 - Changes to an Electric Reliability Organization Rule or Regional Entity Rule.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Changes to an Electric Reliability Organization Rule or Regional Entity Rule. 39.10 Section 39.10 Conservation of Power and Water... ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.10 Changes to an Electric...

  12. 18 CFR 39.10 - Changes to an Electric Reliability Organization Rule or Regional Entity Rule.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Changes to an Electric Reliability Organization Rule or Regional Entity Rule. 39.10 Section 39.10 Conservation of Power and Water... ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.10 Changes to an Electric...

  13. 18 CFR 39.10 - Changes to an Electric Reliability Organization Rule or Regional Entity Rule.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Changes to an Electric Reliability Organization Rule or Regional Entity Rule. 39.10 Section 39.10 Conservation of Power and Water... ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.10 Changes to an Electric...

  14. 18 CFR 39.10 - Changes to an Electric Reliability Organization Rule or Regional Entity Rule.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Changes to an Electric Reliability Organization Rule or Regional Entity Rule. 39.10 Section 39.10 Conservation of Power and Water... ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.10 Changes to an Electric...

  15. Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rick Meeker; L. Baldwin; Steinar Dale

    2010-03-31

    Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintainingmore » system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and

  16. Potential for deserts to supply reliable renewable electric power

    NASA Astrophysics Data System (ADS)

    Labordena, Mercè; Lilliestam, Johan

    2015-04-01

    To avoid dangerous climate change, the electricity systems must be decarbonized by mid-century. The world has sufficient renewable electricity resources for complete power sector decarbonization, but an expansion of renewables poses several challenges for the electricity systems. First, wind and solar PV power are intermittent and supply-controlled, making it difficult to securely integrate this fluctuating generation into the power systems. Consequently, power sources that are both renewable and dispatchable, such as biomass, hydro and concentrating solar power (CSP), are particularly important. Second, renewable power has a low power density and needs vast areas of land, which is problematic both due to cost reasons and due to land-use conflicts, in particular with agriculture. Renewable and dispatchable technologies that can be built in sparsely inhabited regions or on land with low competition with agriculture would therefore be especially valuable; this land-use competition greatly limits the potential for hydro and biomass electricity. Deserts, however, are precisely such low-competition land, and are at the same time the most suited places for CSP generation, but this option would necessitate long transmission lines from remote places in the deserts to the demand centers such as big cities. We therefore study the potential for fleets of CSP plants in the large deserts of the world to produce reliable and reasonable-cost renewable electricity for regions with high and/or rapidly increasing electricity demand and with a desert within or close to its borders. The regions in focus here are the European Union, North Africa and the Middle East, China and Australia. We conduct the analysis in three steps. First, we identify the best solar generation areas in the selected deserts using geographic information systems (GIS), and applying restrictions to minimize impact on biodiversity, soils, human heath, and land-use and land-cover change. Second, we identify

  17. 78 FR 65640 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory... following meetings: North American Electric Reliability Corporation Member Representatives Committee and..., Compliance Committee, and Standards Oversight and Technology Committee Meetings The Westin Buckhead Atlanta...

  18. 78 FR 7773 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory... following meetings: North American Electric Reliability Corporation, Member Representatives Committee and... Resources Committee, and Standards Oversight and Technology Committee Meetings. Hotel del Coronado, 1500...

  19. 78 FR 43198 - Flexible and Local Resources Needed for Reliability in the California Wholesale Electric Market...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... Local Resources Needed for Reliability in the California Wholesale Electric Market; Notice of Staff... Flexible and Local Resources Needed for Reliability in the California Wholesale Electric Market July 31... development of a durable, market-based mechanism to provide incentives to insure reliability needs are met...

  20. 77 FR 65679 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ... Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory... following meetings: North American Electric Reliability Corporation Member Representatives Committee and Board of Trustees Meetings Board of Trustees Compliance Committee and Standards Oversight and Technology...

  1. 78 FR 26349 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory... following meetings: North American Electric Reliability Corporation Member Representatives Committee and... Standards Oversight and Technology Committee Meetings Sheraton Boston Hotel, 39 Dalton Street, Boston, MA...

  2. 10 CFR 500.3 - Electric regions-electric region groupings for reliability measurements under the Powerplant and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Electric regions-electric region groupings for reliability measurements under the Powerplant and Industrial Fuel Use Act of 1978. 500.3 Section 500.3 Energy DEPARTMENT OF... Coordination Group (FCG)—24. 8. Middle South Utilities—25. 9. Southern Company—22, 23. 10. Gulf States Group—35...

  3. High Electricity Demand in the Northeast U.S.: PJM Reliability Network and Peaking Unit Impacts on Air Quality.

    PubMed

    Farkas, Caroline M; Moeller, Michael D; Felder, Frank A; Henderson, Barron H; Carlton, Annmarie G

    2016-08-02

    On high electricity demand days, when air quality is often poor, regional transmission organizations (RTOs), such as PJM Interconnection, ensure reliability of the grid by employing peak-use electric generating units (EGUs). These "peaking units" are exempt from some federal and state air quality rules. We identify RTO assignment and peaking unit classification for EGUs in the Eastern U.S. and estimate air quality for four emission scenarios with the Community Multiscale Air Quality (CMAQ) model during the July 2006 heat wave. Further, we population-weight ambient values as a surrogate for potential population exposure. Emissions from electricity reliability networks negatively impact air quality in their own region and in neighboring geographic areas. Monitored and controlled PJM peaking units are generally located in economically depressed areas and can contribute up to 87% of hourly maximum PM2.5 mass locally. Potential population exposure to peaking unit PM2.5 mass is highest in the model domain's most populated cities. Average daily temperature and national gross domestic product steer peaking unit heat input. Air quality planning that capitalizes on a priori knowledge of local electricity demand and economics may provide a more holistic approach to protect human health within the context of growing energy needs in a changing world.

  4. 77 FR 21522 - Lake Tahoe Basin Management Unit and Tahoe National Forest, CA; Calpeco 625 and 650 Electrical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ... DEPARTMENT OF AGRICULTURE Forest Service Lake Tahoe Basin Management Unit and Tahoe National... hereby given that the USDA Forest Service (USFS), Lake Tahoe Basin Management Unit (LTBMU), together with... reliable electrical transmission system for the north Lake Tahoe area, while accommodating currently...

  5. 77 FR 49441 - Electricity Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-16

    ... recommendations to the Assistant Secretary for Electricity Delivery and Energy Reliability on programs to modernize the Nation's electric power system. Additionally, the renewal of the EAC has been determined to be... Energy Reliability, Department of Energy. ACTION: Notice of Renewal. SUMMARY: Pursuant to Section 14(a)(2...

  6. Solid Insulated Switchgear and Investigation of its Mechanical and Electrical Reliability

    NASA Astrophysics Data System (ADS)

    Sato, Junichi; Kinoshita, Susumu; Sakaguchi, Osamu; Miyagawa, Masaru; Shimizu, Toshio; Homma, Mitsutaka

    SF6 gas is applied widely to medium voltage switchgear because of its high insulation reliability and down-sizing ability. However, SF6 gas was placed on the list of greenhouse gases under the Kyoto Protocol in 1997. Since then, the investigation and development concerning SF6-free or less has carried out activity. Therefore, we paid attention to the solid material which has higher dielectric strength than SF6, and we have newly developed solid insulated switchgear (SIS) achieved by molding all main circuit. A new epoxy casting material is applied, which contains a great deal of spherical silica and a small amount of rubber particles. This new material has the high mechanical strength, high thermal resistance, high toughness, and also high dielectric strength because of directly molding the vacuum bottle, down-sizing and reliability. This paper describes about the technology of a new epoxy casting material which achieves the SIS. In addition, the mechanical and electrical reliability test of SIS applied a new epoxy resin are carried out, and effectiveness of the development material and the mechanical and electrical reliability of SIS are verified.

  7. National Electrical Code in Power Engineering Course for Electrical Engineering Curriculum

    ERIC Educational Resources Information Center

    Azizur, Rahman M. M.

    2011-01-01

    In order to ensure the safety of their inhabitants and properties, the residential, industrial and business installations require complying with NEC (national electrical code) for electrical systems. Electrical design engineers and technicians rely heavily on these very important design guidelines. However, these design guidelines are not formally…

  8. Coal-Powered Electric Generating Unit Efficiency and Reliability Dialogue: Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, Emmanuel

    Coal continues to play a critical role in powering the Nation’s electricity generation, especially for baseload power plants. With aging coal generation assets facing decreased performance due to the state of the equipment, and with challenges exacerbated by the current market pressures on the coal sector, there are opportunities to advance early-stage technologies that can retrofit or replace equipment components. These changes will eventually result in significant improvements in plant performance once further developed and deployed by industry. Research and development in areas such as materials, fluid dynamics, fuel properties and preparation characteristics, and a new generation of plant controlsmore » can lead to new components and systems that can help improve the efficiency and reliability of coal-fired power plants significantly, allowing these assets to continue to provide baseload power. Coal stockpiles at electricity generation plants are typically large enough to provide 30 to 60 days of power prior to resupply—significantly enhancing the stability and reliability of the U.S. electricity sector. Falling prices for non-dispatchable renewable energy and mounting environmental regulations, among other factors, have stimulated efforts to improve the efficiency of these coal-fired electric generating units (EGUs). In addition, increased reliance on natural gas and non-dispatchable energy sources has spurred efforts to further increase the reliability of coal EGUs. The Coal Powered EGU Efficiency and Reliability Dialogue brought together stakeholders from across the coal EGU industry to discuss methods for improvement. Participants at the event reviewed performance-enhancing innovations in coal EGUs, discussed the potential for data-driven management practices to increase efficiency and reliability, investigated the impacts of regulatory compliance on coal EGU performance, and discussed upcoming challenges for the coal industry. This report documents

  9. Interrater Reliability in Large-Scale Assessments--Can Teachers Score National Tests Reliably without External Controls?

    ERIC Educational Resources Information Center

    Pantzare, Anna Lind

    2015-01-01

    In most large-scale assessment systems a set of rather expensive external quality controls are implemented in order to guarantee the quality of interrater reliability. This study empirically examines if teachers' ratings of national tests in mathematics can be reliable without using monitoring, training, or other methods of external quality…

  10. Electrical insulation design requirements and reliability goals

    NASA Astrophysics Data System (ADS)

    Ross, R. G., Jr.

    1983-11-01

    The solar cells in a photovoltaic module which must be electrically isolated from module exterior surfaces to satisfy a variety of safety and operating considerations are discussed. The performance and reliability of the insulation system are examined. Technical requirements involve the capability of withstanding the differential voltage from the solar cells to the module frame. The maximum system voltage includes consideration of maximum open circuit array voltages achieved under low-temperature, high-irradiance conditions, and transient overvoltages due to system feedback of lightning transients. The latter is bounded by the characteristics of incorporated voltage limiting devices such as MOVs.

  11. Reliability Analysis of the Electrical Control System of Subsea Blowout Preventers Using Markov Models

    PubMed Central

    Liu, Zengkai; Liu, Yonghong; Cai, Baoping

    2014-01-01

    Reliability analysis of the electrical control system of a subsea blowout preventer (BOP) stack is carried out based on Markov method. For the subsea BOP electrical control system used in the current work, the 3-2-1-0 and 3-2-0 input voting schemes are available. The effects of the voting schemes on system performance are evaluated based on Markov models. In addition, the effects of failure rates of the modules and repair time on system reliability indices are also investigated. PMID:25409010

  12. 75 FR 41166 - Office of Electricity Delivery and Energy Reliability; Notice of Reestablishment of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-15

    ... DEPARTMENT OF ENERGY Office of Electricity Delivery and Energy Reliability; Notice of Reestablishment of the Electricity Advisory Committee Pursuant to Section 14(a)(2)(A) of the Federal Advisory... Administration, notice is hereby given that the Electricity Advisory Committee has been reestablished for a two...

  13. Drought and Heat Wave Impacts on Electricity Grid Reliability in Illinois

    NASA Astrophysics Data System (ADS)

    Stillwell, A. S.; Lubega, W. N.

    2016-12-01

    A large proportion of thermal power plants in the United States use cooling systems that discharge large volumes of heated water into rivers and cooling ponds. To minimize thermal pollution from these discharges, restrictions are placed on temperatures at the edge of defined mixing zones in the receiving waters. However, during extended hydrological droughts and heat waves, power plants are often granted thermal variances permitting them to exceed these temperature restrictions. These thermal variances are often deemed necessary for maintaining electricity reliability, particularly as heat waves cause increased electricity demand. Current practice, however, lacks tools for the development of grid-scale operational policies specifying generator output levels that ensure reliable electricity supply while minimizing thermal variances. Such policies must take into consideration characteristics of individual power plants, topology and characteristics of the electricity grid, and locations of power plants within the river basin. In this work, we develop a methodology for the development of these operational policies that captures necessary factors. We develop optimal rules for different hydrological and meteorological conditions, serving as rule curves for thermal power plants. The rules are conditioned on leading modes of the ambient hydrological and meteorological conditions at the different power plant locations, as the locations are geographically close and hydrologically connected. Heat dissipation in the rivers and cooling ponds is modeled using the equilibrium temperature concept. Optimal rules are determined through a Monte Carlo sampling optimization framework. The methodology is applied to a case study of eight power plants in Illinois that were granted thermal variances in the summer of 2012, with a representative electricity grid model used in place of the actual electricity grid.

  14. 10 CFR 500.3 - Electric regions-electric region groupings for reliability measurements under the Powerplant and...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Areas (PSA's) as authorized by section 202(a) of the Federal Power Act except where noted. They will be... Reliability Council (NERC) region with historical coordination policies. (b) The PSA's referred to in the... with DOE for an official determination. Electric Region Groupings and FERC PSA's: 1. Allegheny Power...

  15. Nuclear electric propulsion operational reliability and crew safety study: NEP systems/modeling report

    NASA Technical Reports Server (NTRS)

    Karns, James

    1993-01-01

    The objective of this study was to establish the initial quantitative reliability bounds for nuclear electric propulsion systems in a manned Mars mission required to ensure crew safety and mission success. Finding the reliability bounds involves balancing top-down (mission driven) requirements and bottom-up (technology driven) capabilities. In seeking this balance we hope to accomplish the following: (1) provide design insights into the achievability of the baseline design in terms of reliability requirements, given the existing technology base; (2) suggest alternative design approaches which might enhance reliability and crew safety; and (3) indicate what technology areas require significant research and development to achieve the reliability objectives.

  16. 78 FR 12042 - Electric Grid Integration Technical Workshops

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    .... The documents are the Electricity Distribution System Workshop Discussion Summary and the Electricity... FURTHER INFORMATION CONTACT: Caitlin A. Callaghan, National Electricity Delivery Division, Office of Electricity Delivery and Energy Reliability, U.S. Department of Energy, Forrestal Building, Room 8E-032, 1000...

  17. 7 CFR 1724.50 - Compliance with National Electrical Safety Code (NESC).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Compliance with National Electrical Safety Code (NESC... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.50 Compliance with National Electrical Safety Code...

  18. 7 CFR 1724.50 - Compliance with National Electrical Safety Code (NESC).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Compliance with National Electrical Safety Code (NESC... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.50 Compliance with National Electrical Safety Code...

  19. 7 CFR 1724.50 - Compliance with National Electrical Safety Code (NESC).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Compliance with National Electrical Safety Code (NESC... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.50 Compliance with National Electrical Safety Code...

  20. 7 CFR 1724.50 - Compliance with National Electrical Safety Code (NESC).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Compliance with National Electrical Safety Code (NESC... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.50 Compliance with National Electrical Safety Code...

  1. 7 CFR 1724.50 - Compliance with National Electrical Safety Code (NESC).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Compliance with National Electrical Safety Code (NESC... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.50 Compliance with National Electrical Safety Code...

  2. Reliability Measurement for Mixed Mode Failures of 33/11 Kilovolt Electric Power Distribution Stations

    PubMed Central

    Alwan, Faris M.; Baharum, Adam; Hassan, Geehan S.

    2013-01-01

    The reliability of the electrical distribution system is a contemporary research field due to diverse applications of electricity in everyday life and diverse industries. However a few research papers exist in literature. This paper proposes a methodology for assessing the reliability of 33/11 Kilovolt high-power stations based on average time between failures. The objective of this paper is to find the optimal fit for the failure data via time between failures. We determine the parameter estimation for all components of the station. We also estimate the reliability value of each component and the reliability value of the system as a whole. The best fitting distribution for the time between failures is a three parameter Dagum distribution with a scale parameter and shape parameters and . Our analysis reveals that the reliability value decreased by 38.2% in each 30 days. We believe that the current paper is the first to address this issue and its analysis. Thus, the results obtained in this research reflect its originality. We also suggest the practicality of using these results for power systems for both the maintenance of power systems models and preventive maintenance models. PMID:23936346

  3. Performance Issues for a Changing Electric Power Industry

    EIA Publications

    1995-01-01

    Provides an overview of some of the factors affecting reliability within the electric bulk power system. Historical and projected data related to reliability issues are discussed on a national and regional basis. Current research on economic considerations associated with reliability levels is also reviewed.

  4. Staff Report to the Secretary on Electricity Markets and Reliability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Energy Secretary Rick Perry issued a memo in April of 2017 requesting a study and directing his staff to develop a report to include an assessment of the reliability and resilience of the electric grid and an overview of the evolution of electricity markets. Various factors have emerged over the past 15 years which have impacted power supply and demand in different ways. This study, prepared by experts throughout the Department, contains a comprehensive analysis of these factors and the corresponding data, and presents a series of recommendations meant to inform and guide policy makers, regulators, and the general public.more » Potential areas for further research are also presented.« less

  5. Reliability measurement for mixed mode failures of 33/11 kilovolt electric power distribution stations.

    PubMed

    Alwan, Faris M; Baharum, Adam; Hassan, Geehan S

    2013-01-01

    The reliability of the electrical distribution system is a contemporary research field due to diverse applications of electricity in everyday life and diverse industries. However a few research papers exist in literature. This paper proposes a methodology for assessing the reliability of 33/11 Kilovolt high-power stations based on average time between failures. The objective of this paper is to find the optimal fit for the failure data via time between failures. We determine the parameter estimation for all components of the station. We also estimate the reliability value of each component and the reliability value of the system as a whole. The best fitting distribution for the time between failures is a three parameter Dagum distribution with a scale parameter [Formula: see text] and shape parameters [Formula: see text] and [Formula: see text]. Our analysis reveals that the reliability value decreased by 38.2% in each 30 days. We believe that the current paper is the first to address this issue and its analysis. Thus, the results obtained in this research reflect its originality. We also suggest the practicality of using these results for power systems for both the maintenance of power systems models and preventive maintenance models.

  6. Autonomous, Decentralized Grid Architecture: Prosumer-Based Distributed Autonomous Cyber-Physical Architecture for Ultra-Reliable Green Electricity Networks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-01-11

    GENI Project: Georgia Tech is developing a decentralized, autonomous, internet-like control architecture and control software system for the electric power grid. Georgia Tech’s new architecture is based on the emerging concept of electricity prosumers—economically motivated actors that can produce, consume, or store electricity. Under Georgia Tech’s architecture, all of the actors in an energy system are empowered to offer associated energy services based on their capabilities. The actors achieve their sustainability, efficiency, reliability, and economic objectives, while contributing to system-wide reliability and efficiency goals. This is in marked contrast to the current one-way, centralized control paradigm.

  7. Regulation of transmission line capacity and reliability in electric networks

    NASA Astrophysics Data System (ADS)

    Celebi, Metin

    This thesis is composed of two essays that analyze the incentives and optimal regulation of a monopolist line owner in providing capacity and reliability. Similar analyses in the economic literature resulted in under-investment by an unregulated line owner when line reliability was treated as an exogenous variable. However, reliability should be chosen on the basis of economic principles as well, taking into account not only engineering principles but also the preferences of electricity users. When reliability is treated as a choice variable, both over- and under-investment by the line owner becomes possible. The result depends on the cross-cost elasticity of line construction and on the interval in which the optimal choices of capacity take place. We present some sufficient conditions that lead to definite results about the incentives of the line owner. We also characterize the optimal regulation of the line owner under incomplete information. Our analysis shows that the existence of a line is justified for the social planner when the reliability of other lines on the network is not too high, or when the marginal cost of generation at the expensive generating plant is high. The expectation of higher demand in the future makes the regulator less likely to build the line if it will be congested and reliability of other lines is high enough. It is always optimal to have a congested line under complete information, but not necessarily under incomplete information.

  8. 76 FR 60820 - North American Electric Reliability Corporation; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RD10-8-000] North American Electric Reliability Corporation; Notice of Technical Conference Take notice that the Federal Energy... Conference will explore the risks of leaving dial-up intelligent electronic devices that are part of the Bulk...

  9. National Electric Sector Cybersecurity Organization Resource (NESCOR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The goal of the National Electric Sector Cybersecurity Organization Resource (NESCOR) project was to address cyber security issues for the electric sector, particularly in the near and mid-term. The following table identifies the strategies from the DOE Roadmap to Achieve Energy Delivery Systems Cybersecurity published in September 2011 that are applicable to the NESCOR project.

  10. Wholesale electricity market design with increasing levels of renewable generation: Revenue sufficiency and long-term reliability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Milligan, Michael; Frew, Bethany A.; Bloom, Aaron

    This paper discusses challenges that relate to assessing and properly incentivizing the resources necessary to ensure a reliable electricity system with growing penetrations of variable generation (VG). The output of VG (primarily wind and solar generation) varies over time and cannot be predicted precisely. Therefore, the energy from VG is not always guaranteed to be available at times when it is most needed. This means that its contribution towards resource adequacy can be significantly less than the contribution from traditional resources. Variable renewable resources also have near-zero variable costs, and with production-based subsidies they may even have negative offer costs.more » Because variable costs drive the spot price of energy, this can lead to reduced prices, sales, and therefore revenue for all resources within the energy market. The characteristics of VG can also result in increased price volatility as well as the need for more flexibility in the resource fleet in order to maintain system reliability. We explore both traditional and evolving electricity market designs in the United States that aim to ensure resource adequacy and sufficient revenues to recover costs when those resources are needed for longterm reliability. We also investigate how reliability needs may be evolving and discuss how VG may affect future electricity market designs« less

  11. A reliability design method for a lithium-ion battery pack considering the thermal disequilibrium in electric vehicles

    NASA Astrophysics Data System (ADS)

    Xia, Quan; Wang, Zili; Ren, Yi; Sun, Bo; Yang, Dezhen; Feng, Qiang

    2018-05-01

    With the rapid development of lithium-ion battery technology in the electric vehicle (EV) industry, the lifetime of the battery cell increases substantially; however, the reliability of the battery pack is still inadequate. Because of the complexity of the battery pack, a reliability design method for a lithium-ion battery pack considering the thermal disequilibrium is proposed in this paper based on cell redundancy. Based on this method, a three-dimensional electric-thermal-flow-coupled model, a stochastic degradation model of cells under field dynamic conditions and a multi-state system reliability model of a battery pack are established. The relationships between the multi-physics coupling model, the degradation model and the system reliability model are first constructed to analyze the reliability of the battery pack and followed by analysis examples with different redundancy strategies. By comparing the reliability of battery packs of different redundant cell numbers and configurations, several conclusions for the redundancy strategy are obtained. More notably, the reliability does not monotonically increase with the number of redundant cells for the thermal disequilibrium effects. In this work, the reliability of a 6 × 5 parallel-series configuration is the optimal system structure. In addition, the effect of the cell arrangement and cooling conditions are investigated.

  12. Wholesale electricity market design with increasing levels of renewable generation: Revenue sufficiency and long-term reliability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Milligan, Michael; Frew, Bethany A.; Bloom, Aaron

    This paper discusses challenges that relate to assessing and properly incentivizing the resources necessary to ensure a reliable electricity system with growing penetrations of variable generation (VG). The output of VG (primarily wind and solar generation) varies over time and cannot be predicted precisely. Therefore, the energy from VG is not always guaranteed to be available at times when it is most needed. This means that its contribution towards resource adequacy can be significantly less than the contribution from traditional resources. Variable renewable resources also have near-zero variable costs, and with production-based subsidies they may even have negative offer costs.more » Because variable costs drive the spot price of energy, this can lead to reduced prices, sales, and therefore revenue for all resources within the energy market. The characteristics of VG can also result in increased price volatility as well as the need for more flexibility in the resource fleet in order to maintain system reliability. Furthermore, we explore both traditional and evolving electricity market designs in the United States that aim to ensure resource adequacy and sufficient revenues to recover costs when those resources are needed for long-term reliability. We also investigate how reliability needs may be evolving and discuss how VG may affect future electricity market designs.« less

  13. Wholesale electricity market design with increasing levels of renewable generation: Revenue sufficiency and long-term reliability

    DOE PAGES

    Milligan, Michael; Frew, Bethany A.; Bloom, Aaron; ...

    2016-03-22

    This paper discusses challenges that relate to assessing and properly incentivizing the resources necessary to ensure a reliable electricity system with growing penetrations of variable generation (VG). The output of VG (primarily wind and solar generation) varies over time and cannot be predicted precisely. Therefore, the energy from VG is not always guaranteed to be available at times when it is most needed. This means that its contribution towards resource adequacy can be significantly less than the contribution from traditional resources. Variable renewable resources also have near-zero variable costs, and with production-based subsidies they may even have negative offer costs.more » Because variable costs drive the spot price of energy, this can lead to reduced prices, sales, and therefore revenue for all resources within the energy market. The characteristics of VG can also result in increased price volatility as well as the need for more flexibility in the resource fleet in order to maintain system reliability. Furthermore, we explore both traditional and evolving electricity market designs in the United States that aim to ensure resource adequacy and sufficient revenues to recover costs when those resources are needed for long-term reliability. We also investigate how reliability needs may be evolving and discuss how VG may affect future electricity market designs.« less

  14. Graphical Contingency Analysis for the Nation's Electric Grid

    ScienceCinema

    Zhenyu (Henry) Huang

    2017-12-09

    PNNL has developed a new tool to manage the electric grid more effectively, helping prevent blackouts and brownouts--and possibly avoiding millions of dollars in fines for system violations. The Graphical Contingency Analysis tool monitors grid performance, shows prioritized lists of problems, provides visualizations of potential consequences, and helps operators identify the most effective courses of action. This technology yields faster, better decisions and a more stable and reliable power grid.

  15. 77 FR 47051 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and/or Commission staff may attend...

  16. 76 FR 66924 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the...

  17. 76 FR 7839 - Notice of Commission Staff Attendance at North American Electric Reliability Corporation (NERC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance at North American Electric Reliability Corporation (NERC) Meetings from January-June 2011 The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and Commission staff may...

  18. 77 FR 24946 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the...

  19. 76 FR 28024 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the...

  20. 77 FR 6112 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the...

  1. 75 FR 44235 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings July 21, 2010. The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend...

  2. Global Electricity Trade Network: Structures and Implications

    PubMed Central

    Ji, Ling; Jia, Xiaoping; Chiu, Anthony S. F.; Xu, Ming

    2016-01-01

    Nations increasingly trade electricity, and understanding the structure of the global power grid can help identify nations that are critical for its reliability. This study examines the global grid as a network with nations as nodes and international electricity trade as links. We analyze the structure of the global electricity trade network and find that the network consists of four sub-networks, and provide a detailed analysis of the largest network, Eurasia. Russia, China, Ukraine, and Azerbaijan have high betweenness measures in the Eurasian sub-network, indicating the degrees of centrality of the positions they hold. The analysis reveals that the Eurasian sub-network consists of seven communities based on the network structure. We find that the communities do not fully align with geographical proximity, and that the present international electricity trade in the Eurasian sub-network causes an approximately 11 million additional tons of CO2 emissions. PMID:27504825

  3. Global Electricity Trade Network: Structures and Implications.

    PubMed

    Ji, Ling; Jia, Xiaoping; Chiu, Anthony S F; Xu, Ming

    2016-01-01

    Nations increasingly trade electricity, and understanding the structure of the global power grid can help identify nations that are critical for its reliability. This study examines the global grid as a network with nations as nodes and international electricity trade as links. We analyze the structure of the global electricity trade network and find that the network consists of four sub-networks, and provide a detailed analysis of the largest network, Eurasia. Russia, China, Ukraine, and Azerbaijan have high betweenness measures in the Eurasian sub-network, indicating the degrees of centrality of the positions they hold. The analysis reveals that the Eurasian sub-network consists of seven communities based on the network structure. We find that the communities do not fully align with geographical proximity, and that the present international electricity trade in the Eurasian sub-network causes an approximately 11 million additional tons of CO2 emissions.

  4. Inventing the future of reliability: FERC's recent orders and the consolidation of reliability authority

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Skees, J. Daniel

    2010-06-15

    The Energy Policy Act of 2005 established mandatory reliability standard enforcement under a system in which the Federal Energy Regulatory Commission and the Electric Reliability Organization would have their own spheres of responsibility and authority. Recent orders, however, reflect the Commission's frustration with the reliability standard drafting process and suggest that the Electric Reliability Organization's discretion is likely to receive less deference in the future. (author)

  5. Electric Power Monthly, June 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-09-13

    The EPM is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, electricity sales, and average revenue per kilowatthour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, company and plant level information are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity andmore » quality of fuel, and cost of fuel. Quantity, quality, and cost of fuel data lag the net generation, fuel consumption, fuel stocks, electricity sales, and average revenue per kilowatthour data by 1 month. This difference in reporting appears in the national, Census division, and State level tables. However, at the plant level, all statistics presented are for the earlier month for the purpose of comparison. 40 tabs.« less

  6. 75 FR 71613 - Mandatory Reliability Standards for Interconnection Reliability Operating Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... Reliability Standards. The proposed Reliability Standards were designed to prevent instability, uncontrolled... Reliability Standards.\\2\\ The proposed Reliability Standards were designed to prevent instability... the SOLs, which if exceeded, could expose a widespread area of the bulk electric system to instability...

  7. Electrical characterization of FIB processed metal layers for reliable conductive-AFM on ZnO microstructures

    NASA Astrophysics Data System (ADS)

    Pea, M.; Maiolo, L.; Giovine, E.; Rinaldi, A.; Araneo, R.; Notargiacomo, A.

    2016-05-01

    We report on the conductive-atomic force microscopy (C-AFM) study of metallic layers in order to find the most suitable configuration for electrical characterization of individual ZnO micro-pillars fabricated by focused ion beam (FIB). The electrical resistance between the probe tip and both as deposited and FIB processed metal layers (namely, Cr, Ti, Au and Al) has been investigated. Both chromium and titanium evidenced a non homogenous and non ohmic behaviour, non negligible scanning probe induced anodic oxidation associated to electrical measurements, and after FIB milling they exhibited significantly higher tip-sample resistance. Aluminium had generally a more apparent non conductive behaviour. Conversely, gold films showed very good tip-sample conduction properties being less sensitive to FIB processing than the other investigated metals. We found that a reliable C-AFM electrical characterization of ZnO microstructures obtained by FIB machining is feasible by using a combination of metal films as top contact layer. An Au/Ti bilayer on top of ZnO was capable to sustain the FIB fabrication process and to form a suitable ohmic contact to the semiconductor, allowing for reliable C-AFM measurement. To validate the consistency of this approach, we measured the resistance of ZnO micropillars finding a linear dependence on the pillar height, as expected for an ohmic conductor, and evaluated the resistivity of the material. This procedure has the potential to be downscaled to nanometer size structures by a proper choice of metal films type and thickness.

  8. 2017 NREL Photovoltaic Reliability Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, Sarah

    NREL's Photovoltaic (PV) Reliability Workshop (PVRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology -- both critical goals for moving PV technologies deeper into the electricity marketplace.

  9. Strategies, Protections and Mitigations for Electric Grid from Electromagnetic Pulse Effects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Foster, Rita Ann; Frickey, Steven Jay

    2016-01-01

    The mission of DOE’s Office of Electricity Delivery and Energy Reliability (OE) is to lead national efforts to modernize the electricity delivery system, enhance the security and reliability of America’s energy infrastructure and facilitate recovery from disruptions to the energy supply. One of the threats OE is concerned about is a high-altitude electro-magnetic pulse (HEMP) from a nuclear explosion and eletro-magnetic pulse (EMP) or E1 pulse can be generated by EMP weapons. DOE-OE provides federal leadership and technical guidance in addressing electric grid issues. The Idaho National Laboratory (INL) was chosen to conduct the EMP study for DOE-OE due tomore » its capabilities and experience in setting up EMP experiments on the electric grid and conducting vulnerability assessments and developing innovative technology to increase infrastructure resiliency. This report identifies known impacts to EMP threats, known mitigations and effectiveness of mitigations, potential cost of mitigation, areas for government and private partnerships in protecting the electric grid to EMP, and identifying gaps in our knowledge and protection strategies.« less

  10. 77 FR 66606 - Allegheny Electric Cooperative, Inc. and the Connecticut Bank and Trust Company, National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Electric Cooperative, Inc. and the Connecticut Bank and Trust Company, National Association; Notice of..., Allegheny Electric Cooperative, Inc. (AECI) and The U.S. Bank National Association, (as successor in..., Allegheny Electric Cooperative, Inc., 212 Locust Street, Harrisburg, PA 17101, phone (717) 233-5704. Mr...

  11. Improving yield and reliability of FIB modifications using electrical testing

    NASA Astrophysics Data System (ADS)

    Desplats, Romain; Benbrik, Jamel; Benteo, Bruno; Perdu, Philippe

    1998-08-01

    Focused Ion Beam technology has two main areas of application for ICs: modification and preparation for technological analysis. The most solicited area is modification. This involves physically modifying a circuit by cutting lines and creating new ones in order to change the electrical function of the circuit. IC planar technologies have an increasing number of metal interconnections making FIB modifications more complex and decreasing their changes of success. The yield of FIB operations on ICs reflects a downward trend that imposes a greater number of circuits to be modified in order to successfully correct a small number of them. This requires extended duration, which is not compatible with production line turn around times. To respond to this problem, two solutions can be defined: either, reducing the duration of each FIB operation or increasing the success rate of FIB modifications. Since reducing the time depends mainly on FIB operator experience, insuring a higher success rate represents a more crucial aspect as both experienced and novice operators could benefit from this improvement. In order to insure successful modifications, it is necessary to control each step of a FIB operation. To do this, we have developed a new method using in situ electrical testing which has a direct impact on the yield of FIB modifications. We will present this innovative development through a real case study of a CMOS ASIC for high-speed communications. Monitoring the electrical behavior at each step in a FIB operation makes it possible to reduce the number of circuits to be modified and consequently reduces system costs thanks to better yield control. Knowing the internal electrical behavior also gives us indications about the impact on reliability of FIB modified circuits. Finally, this approach can be applied to failure analysis and FIB operations on flip chip circuits.

  12. 76 FR 44323 - National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-49-000] National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of Petition for Declaratory Order Take..., 18 CFR 385.207, National Grid Transmission Services Corporation and Bangor Hydro Electric Company...

  13. 77 FR 34379 - North American Electric Reliability Corporation; Notice of Designation of Commission Staff as Non...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... Electric Reliability Corporation; Notice of Designation of Commission Staff as Non-Decisional With respect... below, the staff of the Office of Enforcement are designated as non-decisional in deliberations by the... non-decisional staff, pursuant to 18 CFR 385.2201 (2011), they are prohibited from communicating with...

  14. 78 FR 38311 - Reliability Technical Conference Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    ... issues related to the reliability of the Bulk-Power System. The agenda for this conference is attached... Reliability Technical Docket No. AD13-6-000 Conference. North American Electric Docket No. RC11-6-004 Reliability Corporation. North American Electric Docket No. RR13-2-000 Reliability Corporation. Not...

  15. Electric Trams : Lessons Learned at Cape Cod National Seashore

    DOT National Transportation Integrated Search

    2005-08-31

    In seeking to obtain environmentally friendly replacement vehicles for its parking shuttle service, Cape Cod National Seashore set out to procure two hybrid-electric trams in 1998. Ultimately, battery-powered trams were delivered with multiple safety...

  16. 2016 NREL Photovoltaic Module Reliability Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, Sarah

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology - both critical goals for moving PV technologies deeper into the electricity marketplace.

  17. 2015 NREL Photovoltaic Module Reliability Workshops

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, Sarah

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  18. Reliability as the big persuader to privatize the electrical system in Venezuela

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alvarez B., C.E.

    1998-12-31

    Throughout the past five years, the Venezuelan authorities, especially the Fondo de Inversiones de Venezuela (FIV), have done a major effort to privatize many of the state owned industries, among them, the electrical public utilities and some important electrical power generation plants or systems based on thermal generation. Mainly along the recent past years, black and brownouts have become more frequent in the system. In other words, system reliability has been diminishing, as a consequence of investment capital and O and M expenses have been reduced to levels below the required by the system. Public opinion is exercising pressure onmore » politicians, so signals are that Congress will probably approve during the current or beginning of next years the required laws to expedite privatization and assure incentives and guaranties to investors. This paper deals with the insides of all these aspects, and with how soon privatization will be carried out. The FIV has been committed to implement this process.« less

  19. High reliability organizing implementation at Sequoia and Kings Canyon National Parks

    Treesearch

    David A. Christenson; Mike DeGrosky; Anne E. Black; Brett Fay

    2008-01-01

    It is said that action often precedes cognition. For example, wildland fire management personnel already do things in the course of their work that they will later recognize as consistent with the principles of high reliability organizing (HRO), once they know about those principles. In the case of Sequoia and Kings Canyon National Parks (SEKI), the fire management...

  20. Reliability and Failure Modes of Solid-State Lighting Electrical Drivers Subjected to Accelerated Aging

    DOE PAGES

    Lall, Pradeep; Sakalaukus, Peter; Davis, Lynn

    2015-02-19

    An investigation of an off-the-shelf solid-state lighting device with the primary focus on the accompanied light-emitting diode (LED) electrical driver (ED) has been conducted. A set of 10 EDs were exposed to temperature humidity life testing of 85% RH and 85 C (85/85) without an electrical bias per the JEDEC standard JESD22-A101C in order to accelerate the ingress of moisture into the aluminum electrolytic capacitor (AEC) and the EDs in order to assess the reliability of the LED drivers for harsh environment applications. The capacitance and equivalent series resistance for each AEC inside the ED were measured using a handheldmore » LCR meter as possible leading indications of failure. The photometric quantities of a single pristine light engine were monitored in order to investigate the interaction between the light engine and the EDs. These parameters were used in assessing the overall reliability of the EDs. In addition, a comparative analysis has been conducted between the 85/85 accelerated test data and a previously published high-temperature storage life accelerated test of 135°C. The results of the 85/85 acceleration test and the comparative analysis are presented in this paper.« less

  1. 76 FR 71011 - Reliability Technical Conference Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... Reliability Technical Conference. Docket No. AD12-1-000 North American Electric Docket No. RC11-6-000... Chief Executive Officer, North American Electric Reliability Corporation (NERC) Kevin Burke, Chairman... and Reliability, American Public Power Association (APPA); NERC Standards Committee Chairman Deborah...

  2. From Ions to Wires to the Grid: The Transformational Science of LANL Research in High-Tc Superconducting Tapes and Electric Power Applications

    ScienceCinema

    Marken, Ken

    2018-01-09

    The Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) has been tasked to lead national efforts to modernize the electric grid, enhance security and reliability of the energy infrastructure, and facilitate recovery from disruptions to energy supplies. LANL has pioneered the development of coated conductors – high-temperature superconducting (HTS) tapes – which permit dramatically greater current densities than conventional copper cable, and enable new technologies to secure the national electric grid. Sustained world-class research from concept, demonstration, transfer, and ongoing industrial support has moved this idea from the laboratory to the commercial marketplace.

  3. 75 FR 15371 - Time Error Correction Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million Texas customers. As the independent system operator for the region, ERCOT schedules power on an electric grid that... Coordinating Council (WECC) is responsible for coordinating and promoting bulk electric system reliability in...

  4. Effect of UV curing time on physical and electrical properties and reliability of low dielectric constant materials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kao, Kai-Chieh; Cheng, Yi-Lung, E-mail: yjcheng@ncnu.edu.tw; Chang, Wei-Yuan

    2014-11-01

    This study comprehensively investigates the effect of ultraviolet (UV) curing time on the physical, electrical, and reliability characteristics of porous low-k materials. Following UV irradiation for various periods, the depth profiles of the chemical composition in the low-k dielectrics were homogeneous. Initially, the UV curing process preferentially removed porogen-related CH{sub x} groups and then modified Si-CH{sub 3} and cage Si-O bonds to form network Si-O bonds. The lowest dielectric constant (k value) was thus obtained at a UV curing time of 300 s. Additionally, UV irradiation made porogen-based low-k materials hydrophobic and to an extent that increased with UV curing time.more » With a short curing time (<300 s), porogen was not completely removed and the residues degraded reliability performance. A long curing time (>300 s) was associated with improved mechanical strength, electrical performance, and reliability of the low-k materials, but none of these increased linearly with UV curing time. Therefore, UV curing is necessary, but the process time must be optimized for porous low-k materials on back-end of line integration in 45 nm or below technology nodes.« less

  5. Metrics for the National SCADA Test Bed Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Craig, Philip A.; Mortensen, J.; Dagle, Jeffery E.

    2008-12-05

    The U.S. Department of Energy Office of Electricity Delivery and Energy Reliability (DOE-OE) National SCADA Test Bed (NSTB) Program is providing valuable inputs into the electric industry by performing topical research and development (R&D) to secure next generation and legacy control systems. In addition, the program conducts vulnerability and risk analysis, develops tools, and performs industry liaison, outreach and awareness activities. These activities will enhance the secure and reliable delivery of energy for the United States. This report will describe metrics that could be utilized to provide feedback to help enhance the effectiveness of the NSTB Program.

  6. National Plug-In Electric Vehicle Infrastructure Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, Eric W.; Rames, Clement L.; Muratori, Matteo

    This document describes a study conducted by the National Renewable Energy Laboratory quantifying the charging station infrastructure required to serve the growing U.S. fleet of plug-in electric vehicles (PEVs). PEV sales, which include plug-in hybrid electric vehicles (PHEVs) and battery electric vehicles (BEVs), have surged recently. Most PEV charging occurs at home, but widespread PEV adoption will require the development of a national network of non-residential charging stations. Installation of these stations strategically would maximize the economic viability of early stations while enabling efficient network growth as the PEV market matures. This document describes what effective co-evolution of the PEVmore » fleet and charging infrastructure might look like under a range of scenarios. To develop the roadmap, NREL analyzed PEV charging requirements along interstate corridors and within urban and rural communities. The results suggest that a few hundred corridor fast-charging stations could enable long-distance BEV travel between U.S. cities. Compared to interstate corridors, urban and rural communities are expected to have significantly larger charging infrastructure requirements. About 8,000 fast-charging stations would be required to provide a minimum level of coverage nationwide. In an expanding PEV market, the total number of non-residential charging outlets or 'plugs' required to meet demand ranges from around 100,000 to more than 1.2 million. Understanding what drives this large range in capacity requirements is critical. For example, whether consumers prefer long-range or short-range PEVs has a larger effect on plug requirements than does the total number of PEVs on the road. The relative success of PHEVs versus BEVs also has a major impact, as does the number of PHEVs that charge away from home. This study shows how important it is to understand consumer preferences and driving behaviors when planning charging networks.« less

  7. National Plug-In Electric Vehicle Infrastructure Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muratori, Matteo; Rames, Clement L; Srinivasa Raghavan, Sesha

    This presentation describes a study conducted by the National Renewable Energy Laboratory quantifying the charging station infrastructure required to serve the growing U.S. fleet of plug-in electric vehicles (PEVs). PEV sales, which include plug-in hybrid electric vehicles (PHEVs) and battery electric vehicles (BEVs), have surged recently. Most PEV charging occurs at home, but widespread PEV adoption will require the development of a national network of non-residential charging stations. Installation of these stations strategically would maximize the economic viability of early stations while enabling efficient network growth as the PEV market matures. This document describes what effective co-evolution of the PEVmore » fleet and charging infrastructure might look like under a range of scenarios. To develop the roadmap, NREL analyzed PEV charging requirements along interstate corridors and within urban and rural communities. The results suggest that a few hundred corridor fast-charging stations could enable long-distance BEV travel between U.S. cities. Compared to interstate corridors, urban and rural communities are expected to have significantly larger charging infrastructure requirements. About 8,000 fast-charging stations would be required to provide a minimum level of coverage nationwide. In an expanding PEV market, the total number of non-residential charging outlets or 'plugs' required to meet demand ranges from around 100,000 to more than 1.2 million. Understanding what drives this large range in capacity requirements is critical. For example, whether consumers prefer long-range or short-range PEVs has a larger effect on plug requirements than does the total number of PEVs on the road. The relative success of PHEVs versus BEVs also has a major impact, as does the number of PHEVs that charge away from home. This study shows how important it is to understand consumer preferences and driving behaviors when planning charging networks.« less

  8. Reliability and safety of the electrical power supply complex of the Hanford production reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robbins, F.D.

    Safety has been and must continue to be the inviolable modulus by which the operation of a nuclear reactor must be judged. A malfunction in any reactor may well result in a release of fission products which may dissipate over a wide geographical area. Such dissipation may place the health, happiness and even the lives of the people in the region in serious jeopardy. As a result, the property damage and liability cost may reach astronomical values in the order of magnitude of billions of dollars. Reliability of the electrical network is an indispensable factor in attaining a high ordermore » of safety assurance. Progress in the peaceful use of atomic energy may take the form of electrical power generation using the nuclear reactor as a source of thermal energy. In view of these factors it seems appropriate and profitable that a critical engineering study be made of the safety and reliability of the Hanford reactors without regard to cost economics. This individual and independent technical engineering analysis was made without regard to Hanford traditional engineering and administration assignments. The main objective has been to focus attention on areas which seem to merit further detailed study on conditions which seem to need adjustment but most of all on those changes which will improve reactor safety. This report is the result of such a study.« less

  9. National Student Survey: Are Differences between Universities and Courses Reliable and Meaningful?

    ERIC Educational Resources Information Center

    Cheng, Jacqueline H. S.; Marsh, Herbert W.

    2010-01-01

    The National Student Survey (NSS) of course experience satisfaction is sent to final year students of all higher education institutions in England, Northern Ireland, Scotland and Wales (N = 171,290 and 157,342 students in 2005 and 2006) and results are made publicly available. The present investigation assesses the reliability and appropriate use…

  10. Electric Motor Thermal Management R&D; NREL (National Renewable Energy Laboratory)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennion, Kevin

    2015-06-09

    Thermal constraints place significant limitations on how electric motors ultimately perform. Without the ability to remove heat, the motor cannot operate without sacrificing performance, efficiency, and reliability. Finite element analysis and computational fluid dynamics modeling approaches are being increasingly utilized in the design and analysis of electric motors. As the models become more sophisticated, it is important to have detailed and accurate knowledge of both the passive thermal performance and the active cooling performance. In this work, we provide an overview of research characterizing both passive and active thermal elements related to electric motor thermal management. To better characterize themore » passive thermal performance, work is being performed to measure motor material thermal properties and thermal contact resistances. The active cooling performance of automatic transmission fluid (ATF) jets is also being measured to better understand the heat transfer coefficients of ATF impinging on motor copper windings.« less

  11. Analysis of recent projections of electric power demand

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hudson, Jr, D V

    1993-08-01

    This report reviews the changes and potential changes in the outlook for electric power demand since the publication of Review and Analysis of Electricity Supply Market Projections (B. Swezey, SERI/MR-360-3322, National Renewable Energy Laboratory). Forecasts of the following organizations were reviewed: DOE/Energy Information Administration, DOE/Policy Office, DRI/McGraw-Hill, North American Electric Reliability Council, and Gas Research Institute. Supply uncertainty was briefly reviewed to place the uncertainties of the demand outlook in perspective. Also discussed were opportunities for modular technologies, such as renewable energy technologies, to fill a potential gap in energy demand and supply.

  12. The effect of the NERC CIP standards on the reliability of the North American Bulk Electric System

    DOE PAGES

    Ladendorff, Marlene Z.

    2016-06-01

    Considerable money and effort has been expended by generation, transmission, and distribution entities in North America to implement the North American Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) standards for the bulk electric system. Assumptions have been made that as a result of the implementation of the standards, the grid is more cyber secure than it was pre-NERC CIP, but are there data supporting these claims, or only speculation? Has the implementation of the standards had an effect on the grid? Furthermore, developing a research study to address these and other questions provided surprising results.

  13. Ensuring reliability in expansion schemes.

    PubMed

    Kamal-Uddin, Abu Sayed; Williams, Donald Leigh

    2005-01-01

    Existing electricity power supplies must serve, or be adapted to serve, the expansion of hospital buildings. With the existing power supply assets of many hospitals being up to 20 years old, assessing the security and reliability of the power system must be given appropriate priority to avoid unplanned outages due to overloads and equipment failures. It is imperative that adequate contingency is planned for essential and non-essential electricity circuits. This article describes the methodology undertaken, and the subsequent recommendations that were made, when evaluating the security and reliability of electricity power supplies to a number of major London hospitals. The methodology described aligns with the latest issue of NHS Estates HTM 2011 'Primary Electrical Infrastructure Emergency Electrical Services Design Guidance' (to which ERA Technology has contributed).

  14. A new approach to power quality and electricity reliability monitoring-case study illustrations of the capabilities of the I-GridTM system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Divan, Deepak; Brumsickle, William; Eto, Joseph

    2003-04-01

    This report describes a new approach for collecting information on power quality and reliability and making it available in the public domain. Making this information readily available in a form that is meaningful to electricity consumers is necessary for enabling more informed private and public decisions regarding electricity reliability. The system dramatically reduces the cost (and expertise) needed for customers to obtain information on the most significant power quality events, called voltage sags and interruptions. The system also offers widespread access to information on power quality collected from multiple sites and the potential for capturing information on the impacts ofmore » power quality problems, together enabling a wide variety of analysis and benchmarking to improve system reliability. Six case studies demonstrate selected functionality and capabilities of the system, including: Linking measured power quality events to process interruption and downtime; Demonstrating the ability to correlate events recorded by multiple monitors to narrow and confirm the causes of power quality events; and Benchmarking power quality and reliability on a firm and regional basis.« less

  15. Reliability Evaluation of Next Generation Inverter: Cooperative Research and Development Final Report, CRADA Number CRD-12-478

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Paret, Paul

    The National Renewable Energy Laboratory (NREL) will conduct thermal and reliability modeling on three sets of power modules for the development of a next generation inverter for electric traction drive vehicles. These modules will be chosen by General Motors (GM) to represent three distinct technological approaches to inverter power module packaging. Likely failure mechanisms will be identified in each package and a physics-of-failure-based reliability assessment will be conducted.

  16. Design and simulation of a novel E-mode GaN MIS-HEMT based on a cascode connection for suppression of electric field under gate and improvement of reliability

    NASA Astrophysics Data System (ADS)

    Li, Weiyi; Zhang, Zhili; Fu, Kai; Yu, Guohao; Zhang, Xiaodong; Sun, Shichuang; Song, Liang; Hao, Ronghui; Fan, Yaming; Cai, Yong; Zhang, Baoshun

    2017-07-01

    We proposed a novel AlGaN/GaN enhancement-mode (E-mode) high electron mobility transistor (HEMT) with a dual-gate structure and carried out the detailed numerical simulation of device operation using Silvaco Atlas. The dual-gate device is based on a cascode connection of an E-mode and a D-mode gate. The simulation results show that electric field under the gate is decreased by more than 70% compared to that of the conventional E-mode MIS-HEMTs (from 2.83 MV/cm decreased to 0.83 MV/cm). Thus, with the discussion of ionized trap density, the proposed dual-gate structure can highly improve electric field-related reliability, such as, threshold voltage stability. In addition, compared with HEMT with field plate structure, the proposed structure exhibits a simplified fabrication process and a more effective suppression of high electric field. Project supported by the Key Technologies Support Program of Jiangsu Province (No. BE2013002-2) and the National Key Scientific Instrument and Equipment Development Projects of China (No. 2013YQ470767).

  17. Electric propulsion reliability: Statistical analysis of on-orbit anomalies and comparative analysis of electric versus chemical propulsion failure rates

    NASA Astrophysics Data System (ADS)

    Saleh, Joseph Homer; Geng, Fan; Ku, Michelle; Walker, Mitchell L. R.

    2017-10-01

    With a few hundred spacecraft launched to date with electric propulsion (EP), it is possible to conduct an epidemiological study of EP's on orbit reliability. The first objective of the present work was to undertake such a study and analyze EP's track record of on orbit anomalies and failures by different covariates. The second objective was to provide a comparative analysis of EP's failure rates with those of chemical propulsion. Satellite operators, manufacturers, and insurers will make reliability- and risk-informed decisions regarding the adoption and promotion of EP on board spacecraft. This work provides evidence-based support for such decisions. After a thorough data collection, 162 EP-equipped satellites launched between January 1997 and December 2015 were included in our dataset for analysis. Several statistical analyses were conducted, at the aggregate level and then with the data stratified by severity of the anomaly, by orbit type, and by EP technology. Mean Time To Anomaly (MTTA) and the distribution of the time to (minor/major) anomaly were investigated, as well as anomaly rates. The important findings in this work include the following: (1) Post-2005, EP's reliability has outperformed that of chemical propulsion; (2) Hall thrusters have robustly outperformed chemical propulsion, and they maintain a small but shrinking reliability advantage over gridded ion engines. Other results were also provided, for example the differentials in MTTA of minor and major anomalies for gridded ion engines and Hall thrusters. It was shown that: (3) Hall thrusters exhibit minor anomalies very early on orbit, which might be indicative of infant anomalies, and thus would benefit from better ground testing and acceptance procedures; (4) Strong evidence exists that EP anomalies (onset and likelihood) and orbit type are dependent, a dependence likely mediated by either the space environment or differences in thrusters duty cycles; (5) Gridded ion thrusters exhibit both

  18. Photovoltaic Module Reliability Workshop 2014: February 25-26, 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, S.

    2014-02-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  19. Photovoltaic Module Reliability Workshop 2011: February 16-17, 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, S.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  20. Photovoltaic Module Reliability Workshop 2013: February 26-27, 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, S.

    2013-10-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  1. Photovoltaic Module Reliability Workshop 2010: February 18-19, 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, J.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  2. The Reliability of Results from National Tests, Public Examinations, and Vocational Qualifications in England

    ERIC Educational Resources Information Center

    He, Qingping; Opposs, Dennis

    2012-01-01

    National tests, public examinations, and vocational qualifications in England are used for a variety of purposes, including the certification of individual learners in different subject areas and the accountability of individual professionals and institutions. However, there has been ongoing debate about the reliability and validity of their…

  3. Improving electrical power systems reliability through locally controlled distributed curtailable load

    NASA Astrophysics Data System (ADS)

    Dehbozorgi, Mohammad Reza

    2000-10-01

    Improvements in power system reliability have always been of interest to both power companies and customers. Since there are no sizable electrical energy storage elements in electrical power systems, the generated power should match the load demand at any given time. Failure to meet this balance may cause severe system problems, including loss of generation and system blackouts. This thesis proposes a methodology which can respond to either loss of generation or loss of load. It is based on switching of electric water heaters using power system frequency as the controlling signal. The proposed methodology encounters, and the thesis has addressed, the following associated problems. The controller must be interfaced with the existing thermostat control. When necessary to switch on loads, the water in the tank should not be overheated. Rapid switching of blocks of load, or chattering, has been considered. The contributions of the thesis are: (A) A system has been proposed which makes a significant portion of the distributed loads connected to a power system to behave in a predetermined manner to improve the power system response during disturbances. (B) The action of the proposed system is transparent to the customers. (C) The thesis proposes a simple analysis for determining the amount of such loads which might be switched and relates this amount to the size of the disturbances which can occur in the utility. (D) The proposed system acts without any formal communication links, solely using the embedded information present system-wide. (E) The methodology of the thesis proposes switching of water heater loads based on a simple, localized frequency set-point controller. The thesis has identified the consequent problem of rapid switching of distributed loads, which is referred to as chattering. (F) Two approaches have been proposed to reduce chattering to tolerable levels. (G) A frequency controller has been designed and built according to the specifications required to

  4. In-Use Performance Comparison of Hybrid Electric, CNG, and Diesel Buses at New York City Transit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barnitt, R. A.

    2008-06-01

    The National Renewable Energy Laboratory (NREL) evaluated the performance of diesel, compressed natural gas (CNG), and hybrid electric (equipped with BAE Systems? HybriDrive propulsion system) transit buses at New York City Transit (NYCT). CNG, Gen I and Gen II hybrid electric propulsion systems were compared on fuel economy, maintenance and operating costs per mile, and reliability.

  5. 75 FR 72664 - System Personnel Training Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ...Under section 215 of the Federal Power Act, the Commission approves two Personnel Performance, Training and Qualifications (PER) Reliability Standards, PER-004-2 (Reliability Coordination--Staffing) and PER-005-1 (System Personnel Training), submitted to the Commission for approval by the North American Electric Reliability Corporation, the Electric Reliability Organization certified by the Commission. The approved Reliability Standards require reliability coordinators, balancing authorities, and transmission operators to establish a training program for their system operators, verify each of their system operators' capability to perform tasks, and provide emergency operations training to every system operator. The Commission also approves NERC's proposal to retire two existing PER Reliability Standards that are replaced by the standards approved in this Final Rule.

  6. Pilot evaluation of electricity-reliability and power-quality monitoring in California's Silicon Valley with the I-Grid(R) system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph; Divan, Deepak; Brumsickle, William

    2004-02-01

    Power-quality events are of increasing concern for the economy because today's equipment, particularly computers and automated manufacturing devices, is susceptible to these imperceptible voltage changes. A small variation in voltage can cause this equipment to shut down for long periods, resulting in significant business losses. Tiny variations in power quality are difficult to detect except with expensive monitoring equipment used by trained technicians, so many electricity customers are unaware of the role of power-quality events in equipment malfunctioning. This report describes the findings from a pilot study coordinated through the Silicon Valley Manufacturers Group in California to explore the capabilitiesmore » of I-Grid(R), a new power-quality monitoring system. This system is designed to improve the accessibility of power-quality in formation and to increase understanding of the growing importance of electricity reliability and power quality to the economy. The study used data collected by I-Grid sensors at seven Silicon Valley firms to investigate the impacts of power quality on individual study participants as well as to explore the capabilities of the I-Grid system to detect events on the larger electricity grid by means of correlation of data from the sensors at the different sites. In addition, study participants were interviewed about the value they place on power quality, and their efforts to address electricity-reliability and power-quality problems. Issues were identified that should be taken into consideration in developing a larger, potentially nationwide, network of power-quality sensors.« less

  7. Updated Value of Service Reliability Estimates for Electric Utility Customers in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, Michael; Schellenberg, Josh; Blundell, Marshall

    2015-01-01

    This report updates the 2009 meta-analysis that provides estimates of the value of service reliability for electricity customers in the United States (U.S.). The meta-dataset now includes 34 different datasets from surveys fielded by 10 different utility companies between 1989 and 2012. Because these studies used nearly identical interruption cost estimation or willingness-to-pay/accept methods, it was possible to integrate their results into a single meta-dataset describing the value of electric service reliability observed in all of them. Once the datasets from the various studies were combined, a two-part regression model was used to estimate customer damage functions that can bemore » generally applied to calculate customer interruption costs per event by season, time of day, day of week, and geographical regions within the U.S. for industrial, commercial, and residential customers. This report focuses on the backwards stepwise selection process that was used to develop the final revised model for all customer classes. Across customer classes, the revised customer interruption cost model has improved significantly because it incorporates more data and does not include the many extraneous variables that were in the original specification from the 2009 meta-analysis. The backwards stepwise selection process led to a more parsimonious model that only included key variables, while still achieving comparable out-of-sample predictive performance. In turn, users of interruption cost estimation tools such as the Interruption Cost Estimate (ICE) Calculator will have less customer characteristics information to provide and the associated inputs page will be far less cumbersome. The upcoming new version of the ICE Calculator is anticipated to be released in 2015.« less

  8. Multidisciplinary System Reliability Analysis

    NASA Technical Reports Server (NTRS)

    Mahadevan, Sankaran; Han, Song; Chamis, Christos C. (Technical Monitor)

    2001-01-01

    The objective of this study is to develop a new methodology for estimating the reliability of engineering systems that encompass multiple disciplines. The methodology is formulated in the context of the NESSUS probabilistic structural analysis code, developed under the leadership of NASA Glenn Research Center. The NESSUS code has been successfully applied to the reliability estimation of a variety of structural engineering systems. This study examines whether the features of NESSUS could be used to investigate the reliability of systems in other disciplines such as heat transfer, fluid mechanics, electrical circuits etc., without considerable programming effort specific to each discipline. In this study, the mechanical equivalence between system behavior models in different disciplines are investigated to achieve this objective. A new methodology is presented for the analysis of heat transfer, fluid flow, and electrical circuit problems using the structural analysis routines within NESSUS, by utilizing the equivalence between the computational quantities in different disciplines. This technique is integrated with the fast probability integration and system reliability techniques within the NESSUS code, to successfully compute the system reliability of multidisciplinary systems. Traditional as well as progressive failure analysis methods for system reliability estimation are demonstrated, through a numerical example of a heat exchanger system involving failure modes in structural, heat transfer and fluid flow disciplines.

  9. Photovoltaic Module Reliability Workshop 2012: February 28 - March 1, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, S.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  10. Completeness and reliability of mortality data in Viet Nam: Implications for the national routine health management information system

    PubMed Central

    Phuong Hoa, Nguyen; Walker, Sue M.; Hill, Peter S.; Rao, Chalapati

    2018-01-01

    Background Mortality statistics form a crucial component of national Health Management Information Systems (HMIS). However, there are limitations in the availability and quality of mortality data at national level in Viet Nam. This study assessed the completeness of recorded deaths and the reliability of recorded causes of death (COD) in the A6 death registers in the national routine HMIS in Viet Nam. Methodology and findings 1477 identified deaths in 2014 were reviewed in two provinces. A capture-recapture method was applied to assess the completeness of the A6 death registers. 1365 household verbal autopsy (VA) interviews were successfully conducted, and these were reviewed by physicians who assigned multiple and underlying cause of death (UCOD). These UCODs from VA were then compared with the CODs recorded in the A6 death registers, using kappa scores to assess the reliability of the A6 death register diagnoses. The overall completeness of the A6 death registers in the two provinces was 89.3% (95%CI: 87.8–90.8). No COD recorded in the A6 death registers demonstrated good reliability. There is very low reliability in recording of cardiovascular deaths (kappa for stroke = 0.47 and kappa for ischaemic heart diseases = 0.42) and diabetes (kappa = 0.33). The reporting of deaths due to road traffic accidents, HIV and some cancers are at a moderate level of reliability with kappa scores ranging between 0.57–0.69 (p<0.01). VA methods identify more specific COD than the A6 death registers, and also allow identification of multiple CODs. Conclusions The study results suggest that data completeness in HMIS A6 death registers in the study sample of communes was relatively high (nearly 90%), but triangulation with death records from other sources would improve the completeness of this system. Further, there is an urgent need to enhance the reliability of COD recorded in the A6 death registers, for which VA methods could be effective. Focussed consultation among

  11. Completeness and reliability of mortality data in Viet Nam: Implications for the national routine health management information system.

    PubMed

    Hong, Tran Thi; Phuong Hoa, Nguyen; Walker, Sue M; Hill, Peter S; Rao, Chalapati

    2018-01-01

    Mortality statistics form a crucial component of national Health Management Information Systems (HMIS). However, there are limitations in the availability and quality of mortality data at national level in Viet Nam. This study assessed the completeness of recorded deaths and the reliability of recorded causes of death (COD) in the A6 death registers in the national routine HMIS in Viet Nam. 1477 identified deaths in 2014 were reviewed in two provinces. A capture-recapture method was applied to assess the completeness of the A6 death registers. 1365 household verbal autopsy (VA) interviews were successfully conducted, and these were reviewed by physicians who assigned multiple and underlying cause of death (UCOD). These UCODs from VA were then compared with the CODs recorded in the A6 death registers, using kappa scores to assess the reliability of the A6 death register diagnoses. The overall completeness of the A6 death registers in the two provinces was 89.3% (95%CI: 87.8-90.8). No COD recorded in the A6 death registers demonstrated good reliability. There is very low reliability in recording of cardiovascular deaths (kappa for stroke = 0.47 and kappa for ischaemic heart diseases = 0.42) and diabetes (kappa = 0.33). The reporting of deaths due to road traffic accidents, HIV and some cancers are at a moderate level of reliability with kappa scores ranging between 0.57-0.69 (p<0.01). VA methods identify more specific COD than the A6 death registers, and also allow identification of multiple CODs. The study results suggest that data completeness in HMIS A6 death registers in the study sample of communes was relatively high (nearly 90%), but triangulation with death records from other sources would improve the completeness of this system. Further, there is an urgent need to enhance the reliability of COD recorded in the A6 death registers, for which VA methods could be effective. Focussed consultation among stakeholders is needed to develop a suitable mechanism and

  12. 18 CFR 39.11 - Reliability reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Electric Reliability Organization shall conduct assessments of the adequacy of the Bulk-Power System in... assessments as determined by the Commission of the reliability of the Bulk-Power System in North America and... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Reliability reports. 39...

  13. Robot-Powered Reliability Testing at NREL's ESIF

    ScienceCinema

    Harrison, Kevin

    2018-02-14

    With auto manufacturers expected to roll out fuel cell electric vehicles in the 2015 to 2017 timeframe, the need for a reliable hydrogen fueling infrastructure is greater than ever. That's why the National Renewable Energy Laboratory (NREL) is using a robot in its Energy Systems Integration Facility (ESIF) to assess the durability of hydrogen fueling hoses, a largely untested-and currently costly-component of hydrogen fueling stations. The automated machine mimics the repetitive stress of a human bending and twisting the hose to refuel a vehicle-all under the high pressure and low temperature required to deliver hydrogen to a fuel cell vehicle's onboard storage tank.

  14. Final Report for Clean, Reliable, Affordable Energy that Reflects the Values of the Pinoleville Pomo Nation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steele, Lenora; Sampsel, Zachary N

    This report aims to present and analyze information on the potential of renewable energy power systems and electric vehicle charging near the Pinoleville Pomo Nation in Ukiah, California to provide an environmentally-friendly, cost-effective energy and transportation options for development. For each renewable energy option we examine, solar, wind, microhydro, and biogas in this case, we compiled technology and cost information for construction, estimates of energy capacity, and data on electricity exports rates.

  15. Accelerated reliability testing of highly aligned single-walled carbon nanotube networks subjected to DC electrical stressing.

    PubMed

    Strus, Mark C; Chiaramonti, Ann N; Kim, Young Lae; Jung, Yung Joon; Keller, Robert R

    2011-07-01

    We investigate the electrical reliability of nanoscale lines of highly aligned, networked, metallic/semiconducting single-walled carbon nanotubes (SWCNTs) fabricated through a template-based fluidic assembly process. We find that these SWCNT networks can withstand DC current densities larger than 10 MA cm(-2) for several hours and, in some cases, several days. We develop test methods that show that the degradation rate, failure predictability and total device lifetime can be linked to the initial resistance. Scanning electron and transmission electron microscopy suggest that fabrication variability plays a critical role in the rate of degradation, and we offer an empirical method of quickly determining the long-term performance of a network. We find that well-fabricated lines subject to constant electrical stress show a linear accumulation of damage reminiscent of electromigration in metallic interconnects, and we explore the underlying physical mechanisms that could cause such behavior.

  16. 46 CFR 169.619 - Reliability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Reliability. 169.619 Section 169.619 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Steering Systems § 169.619 Reliability. (a) Except where the OCMI judges it impracticable, the...

  17. 46 CFR 169.619 - Reliability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Reliability. 169.619 Section 169.619 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Steering Systems § 169.619 Reliability. (a) Except where the OCMI judges it impracticable, the...

  18. Fuel Cells Provide Reliable Power to U.S. Postal Service Facility in Anchorage, Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parker, Steven

    2003-01-01

    Working together, the U.S. Postal Service (USPS) and Chugach Electric Association, partnering with the Department of Defense (DOD), Department of Energy (DOE), US Army Corps of Engineers Construction Engineering Research Laboratories (USA CERL), Electric Power Research Institute (EPRI), and National Rural Electric Cooperative Association (NRECA), developed and installed one of the largest fuel cell installations in the world. The one-megawatt fuel cell combined heat and power plant sits behind the Anchorage U.S. Postal Service Mail Processing and Distribution Facility. Chugach Electric owns, operates, and maintains the fuel cell power plant, which provides clean, reliable power to the USPS facility. Inmore » addition, heat recovered from the fuel cells, in the form of hot water, is used to heat the USPS Mail Processing and Distribution Facility. By taking a leadership role, the USPS will save over $800,000 in electricity and natural gas costs over the 5 1/2-year contract term with Chugach Electric.« less

  19. Waste electrical and electronic equipment management and Basel Convention compliance in Brazil, Russia, India, China and South Africa (BRICS) nations.

    PubMed

    Ghosh, Sadhan Kumar; Debnath, Biswajit; Baidya, Rahul; De, Debashree; Li, Jinhui; Ghosh, Sannidhya Kumar; Zheng, Lixia; Awasthi, Abhishek Kumar; Liubarskaia, Maria A; Ogola, Jason S; Tavares, André Neiva

    2016-08-01

    Brazil, Russia, India, China and South Africa (BRICS) nations account for one-quarter of the world's land area, having more than 40% of the world's population, and only one-quarter of the world gross national income. Hence the study and review of waste electrical and electronic equipment management systems in BRICS nations is of relevance. It has been observed from the literature that there are studies available comparing two or three country's waste electrical and electronic equipment status, while the study encompassing the BRICS nations considering in a single framework is scant. The purpose of this study is to analyse the existing waste electrical and electronic equipment management systems and status of compliance to Basel convention in the BRICS nations, noting possible lessons from matured systems, such as those in the European Union EU) and USA. The study introduced a novel framework for a waste electrical and electronic equipment management system that may be adopted in BRICS nations and revealed that BRICS countries have many similar types of challenges. The study also identified some significant gaps with respect to the management systems and trans-boundary movement of waste electrical and electronic equipment, which may attract researchers for further research. © The Author(s) 2016.

  20. Renewable Electricity in the United States: The National Research Council Study and Recent Trends

    NASA Astrophysics Data System (ADS)

    Holmes, K. John; Papay, Lawrence T.

    2011-11-01

    The National Research Council issued Electricity from Renewables: Status, Prospects, and Impediments in 2009 as part of the America's Energy Future Study. The panel that authored this report, the Panel on Electricity from Renewable Sources, worked from 2007 to 2009 gathering information and analysis on the cost, performance and impacts of renewable electricity resources and technologies in the United States. The panel considered the magnitude and distribution of the resource base, the status of renewable electricity technologies, the economics of these technologies, their environmental footprint, and the issues related to scaling up renewables deployment. In its consideration of the future potential for renewable electricity, the panel emphasizes policy, technology, and capital equally because greatly scaling up renewable electricity encounters significant issues that go beyond resource availability or technical capabilities. Here we provide a summary of this report and discuss several recent trends that impact renewable electricity.

  1. Transit Reliability Information Program : PATCO-WMATA Propulsion System Reliability/Productivity Analysis

    DOT National Transportation Integrated Search

    1984-10-01

    The Transit Reliability Information Program (TRIP) is a government-initiated program to assist the transit industry in satisfying its need for transit reliability information. TRIP provides this assistance through the operation of a national data ban...

  2. Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

    NASA Technical Reports Server (NTRS)

    Turnquist, S. R.; Twombly, M.; Hoffman, D.

    1989-01-01

    A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

  3. 75 FR 65964 - Version One Regional Reliability Standard for Resource and Demand Balancing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... Standard developed by the Western Electricity Coordinating Council and approved by the North American... Electricity Coordinating Council 6 C. WECC Regional Reliability Standard BAL-002-WECC-1... 9 II. Discussion 14... Electricity Coordinating Council (WECC) and approved by the North American Electric Reliability Corporation...

  4. Multi-Disciplinary System Reliability Analysis

    NASA Technical Reports Server (NTRS)

    Mahadevan, Sankaran; Han, Song

    1997-01-01

    The objective of this study is to develop a new methodology for estimating the reliability of engineering systems that encompass multiple disciplines. The methodology is formulated in the context of the NESSUS probabilistic structural analysis code developed under the leadership of NASA Lewis Research Center. The NESSUS code has been successfully applied to the reliability estimation of a variety of structural engineering systems. This study examines whether the features of NESSUS could be used to investigate the reliability of systems in other disciplines such as heat transfer, fluid mechanics, electrical circuits etc., without considerable programming effort specific to each discipline. In this study, the mechanical equivalence between system behavior models in different disciplines are investigated to achieve this objective. A new methodology is presented for the analysis of heat transfer, fluid flow, and electrical circuit problems using the structural analysis routines within NESSUS, by utilizing the equivalence between the computational quantities in different disciplines. This technique is integrated with the fast probability integration and system reliability techniques within the NESSUS code, to successfully compute the system reliability of multi-disciplinary systems. Traditional as well as progressive failure analysis methods for system reliability estimation are demonstrated, through a numerical example of a heat exchanger system involving failure modes in structural, heat transfer and fluid flow disciplines.

  5. 18 CFR 40.2 - Mandatory Reliability Standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-POWER SYSTEM § 40.2 Mandatory Reliability Standards. (a) Each applicable user, owner or operator of the Bulk-Power System must comply with Commission-approved Reliability Standards developed by the Electric... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Mandatory Reliability...

  6. 76 FR 23222 - Electric Reliability Organization Interpretation of Transmission Operations Reliability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... applications or print-to-PDF format, and not in a scanned format, at http://www.ferc.gov/docs-filing/efiling....3d 1342 (DC Cir. 2009). \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... applications or print-to-PDF format and not in a scanned format. Commenters filing electronically do not need...

  7. Robot-Powered Reliability Testing at NREL's ESIF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrison, Kevin

    With auto manufacturers expected to roll out fuel cell electric vehicles in the 2015 to 2017 timeframe, the need for a reliable hydrogen fueling infrastructure is greater than ever. That's why the National Renewable Energy Laboratory (NREL) is using a robot in its Energy Systems Integration Facility (ESIF) to assess the durability of hydrogen fueling hoses, a largely untested-and currently costly-component of hydrogen fueling stations. The automated machine mimics the repetitive stress of a human bending and twisting the hose to refuel a vehicle-all under the high pressure and low temperature required to deliver hydrogen to a fuel cell vehicle'smore » onboard storage tank.« less

  8. Robot-Powered Reliability Testing at NREL's ESIF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrison, Kevin

    With auto manufacturers expected to roll out fuel cell electric vehicles in the 2015 to 2017 timeframe, the need for a reliable hydrogen fueling infrastructure is greater than ever. That's why the National Renewable Energy Laboratory (NREL) is using a robot in its Energy Systems Integration Facility (ESIF) to assess the durability of hydrogen fueling hoses, a largely untested—and currently costly—component of hydrogen fueling stations. The automated machine mimics the repetitive stress of a human bending and twisting the hose to refuel a vehicle—all under the high pressure and low temperature required to deliver hydrogen to a fuel cell vehicle'smore » onboard storage tank.« less

  9. Robot-Powered Reliability Testing at NREL's ESIF

    ScienceCinema

    Harrison, Kevin

    2018-02-14

    With auto manufacturers expected to roll out fuel cell electric vehicles in the 2015 to 2017 timeframe, the need for a reliable hydrogen fueling infrastructure is greater than ever. That's why the National Renewable Energy Laboratory (NREL) is using a robot in its Energy Systems Integration Facility (ESIF) to assess the durability of hydrogen fueling hoses, a largely untested—and currently costly—component of hydrogen fueling stations. The automated machine mimics the repetitive stress of a human bending and twisting the hose to refuel a vehicle—all under the high pressure and low temperature required to deliver hydrogen to a fuel cell vehicle's onboard storage tank.

  10. 18 CFR 39.5 - Reliability Standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... 39.5 Section 39.5 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC...

  11. Electrical Performance and Reliability Improvement of Amorphous-Indium-Gallium-Zinc-Oxide Thin-Film Transistors with HfO₂ Gate Dielectrics by CF₄ Plasma Treatment.

    PubMed

    Fan, Ching-Lin; Tseng, Fan-Ping; Tseng, Chiao-Yuan

    2018-05-17

    In this work, amorphous indium-gallium-zinc oxide thin-film transistors (a-IGZO TFTs) with a HfO₂ gate insulator and CF₄ plasma treatment was demonstrated for the first time. Through the plasma treatment, both the electrical performance and reliability of the a-IGZO TFT with HfO₂ gate dielectric were improved. The carrier mobility significantly increased by 80.8%, from 30.2 cm²/V∙s (without treatment) to 54.6 cm²/V∙s (with CF₄ plasma treatment), which is due to the incorporated fluorine not only providing an extra electron to the IGZO, but also passivating the interface trap density. In addition, the reliability of the a-IGZO TFT with HfO₂ gate dielectric has also been improved by the CF₄ plasma treatment. By applying the CF₄ plasma treatment to the a-IGZO TFT, the hysteresis effect of the device has been improved and the device's immunity against moisture from the ambient atmosphere has been enhanced. It is believed that the CF₄ plasma treatment not only significantly improves the electrical performance of a-IGZO TFT with HfO₂ gate dielectric, but also enhances the device's reliability.

  12. 75 FR 80391 - Electric Reliability Organization Interpretations of Interconnection Reliability Operations and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... configuration to maintain system stability, acceptable voltage or power flows.\\12\\ \\12\\ In the Western... prevent system instability or cascading outages, and protect other facilities in response to transmission... nature used to address system reliability vulnerabilities to prevent system instability, cascading...

  13. States of Cybersecurity: Electricity Distribution System Discussions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pena, Ivonne; Ingram, Michael; Martin, Maurice

    State and local entities that oversee the reliable, affordable provision of electricity are faced with growing and evolving threats from cybersecurity risks to our nation's electricity distribution system. All-hazards system resilience is a shared responsibility among electric utilities and their regulators or policy-setting boards of directors. Cybersecurity presents new challenges and should be a focus for states, local governments, and Native American tribes that are developing energy-assurance plans to protect critical infrastructure. This research sought to investigate the implementation of governance and policy at the distribution utility level that facilitates cybersecurity preparedness to inform the U.S. Department of Energy (DOE),more » Office of Energy Policy and Systems Analysis; states; local governments; and other stakeholders on the challenges, gaps, and opportunities that may exist for future analysis. The need is urgent to identify the challenges and inconsistencies in how cybersecurity practices are being applied across the United States to inform the development of best practices, mitigations, and future research and development investments in securing the electricity infrastructure. By examining the current practices and applications of cybersecurity preparedness, this report seeks to identify the challenges and persistent gaps between policy and execution and reflect the underlying motivations of distinct utility structures as they play out at the local level. This study aims to create an initial baseline of cybersecurity preparedness within the distribution electricity sector. The focus of this study is on distribution utilities not bound by the cybersecurity guidelines of the North American Electric Reliability Corporation (NERC) to examine the range of mechanisms taken by state regulators, city councils that own municipal utilities, and boards of directors of rural cooperatives.« less

  14. Transit Reliability Information Program : Reliability Verification Demonstration Plan for Rapid Rail Vehicles

    DOT National Transportation Integrated Search

    1981-08-01

    The Transit Reliability Information Program (TRIP) is a government-initiated program to assist the transit industry in satisfying its need for transit reliability information. TRIP provides this assistance through the operation of a national Data Ban...

  15. Overview of the National Energy-Water System (NEWS) Assessment Framework Study

    NASA Astrophysics Data System (ADS)

    Vorosmarty, C. J.; Miara, A.; Rosenzweig, B.; Corsi, F.; Piasecki, M.; Celicourt, P.; Fekete, B. M.; Macknick, J.; Melillo, J. M.; Newmark, R. L.; Tidwell, V. C.; Suh, S.; Prousevitch, A.

    2015-12-01

    In practical terms, strategic planning for the nation's economic, social and environmental future increasingly centers on issues relating to fresh water. U.S. energy security is highly dependent on electricity generated by the nation's fleet of thermoelectric power stations, which today contribute 90% to total electricity production. This presentation summarizes the overall structure and recent progress on a study devoted to climate adaptation and the reliability of power sector infrastructure and operations, when viewed through the lens of strategic water issues. The focus is on electric power infrastructure, i.e., the types, spatial distributions and levels of investment in technologies that deliver or could deliver electricity to the U.S. economy. The work is guided by a central hypothesis, that today's portfolio of electric power sector infrastructure is unsustainable in the context of satisfying its water needs under anticipated climate change and rising electricity demands. Insofar as water-mediated feedbacks reverberate throughout the national economy, we include macro-economic perspectives as well. The work is organized around the technical development of the NEWS framework which is then used to evaluate, in the context of anticipated climate, economic change and regulatory context: the performance of the nation's electricity sector, the feasibility of alternative pathways to improve climate adaptation, and impacts of energy technology. Scenarios are co-designed with a stakeholder community, and investment tradeoffs are considered with respect to the productivity of the economy, water availability and aquatic ecosystem condition.

  16. 18 CFR 39.6 - Conflict of a Reliability Standard with a Commission Order.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.6 Conflict of a Reliability Standard with...

  17. Electricity and generator availability in LMIC hospitals: improving access to safe surgery.

    PubMed

    Chawla, Sagar; Kurani, Shaheen; Wren, Sherry M; Stewart, Barclay; Burnham, Gilbert; Kushner, Adam; McIntyre, Thomas

    2018-03-01

    Access to reliable energy has been identified as a global priority and codified within United Nations Sustainable Goal 7 and the Electrify Africa Act of 2015. Reliable hospital access to electricity is necessary to provide safe surgical care. The current state of electrical availability in hospitals in low- and middle-income countries (LMICs) throughout the world is not well known. This study aimed to review the surgical capacity literature and document the availability of electricity and generators. Using Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines, a systematic search for surgical capacity assessments in LMICs in MEDLINE, PubMed, and World Health Organization Global Health Library was performed. Data regarding electricity and generator availability were extracted. Estimated percentages for individual countries were calculated. Of 76 articles identified, 21 reported electricity availability, totaling 528 hospitals. Continuous electricity availability at hospitals providing surgical care was 312/528 (59.1%). Generator availability was 309/427 (72.4%). Estimated continuous electricity availability ranged from 0% (Sierra Leone and Malawi) to 100% (Iran); estimated generator availability was 14% (Somalia) to 97.6% (Iran). Less than two-thirds of hospitals providing surgical care in 21 LMICs have a continuous electricity source or have an available generator. Efforts are needed to improve electricity infrastructure at hospitals to assure safe surgical care. Future research should look at the effect of energy availability on surgical care and patient outcomes and novel methods of powering surgical equipment. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. 76 FR 23801 - North American Electric Reliability Corporation; Order Approving Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-28

    ... primary control functionality. Nonetheless, until data from drills, exercises and tests can support a... control center becomes inoperable and to conduct reviews and tests, at least annually, to ensure viability... Preparedness and Operations (EOP) Reliability Standard EOP- 008-1 (Loss of Control Center Functionality). The...

  19. Structural Probability Concepts Adapted to Electrical Engineering

    NASA Technical Reports Server (NTRS)

    Steinberg, Eric P.; Chamis, Christos C.

    1994-01-01

    Through the use of equivalent variable analogies, the authors demonstrate how an electrical subsystem can be modeled by an equivalent structural subsystem. This allows the electrical subsystem to be probabilistically analyzed by using available structural reliability computer codes such as NESSUS. With the ability to analyze the electrical subsystem probabilistically, we can evaluate the reliability of systems that include both structural and electrical subsystems. Common examples of such systems are a structural subsystem integrated with a health-monitoring subsystem, and smart structures. Since these systems have electrical subsystems that directly affect the operation of the overall system, probabilistically analyzing them could lead to improved reliability and reduced costs. The direct effect of the electrical subsystem on the structural subsystem is of secondary order and is not considered in the scope of this work.

  20. 3 CFR - Transforming Our Nation's Electric Grid Through Improved Siting, Permitting, and Review

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Steering Committee and shall report to the Steering Committee their progress on meeting the milestones... Memorandum for the Heads of Executive Departments and Agencies Our Nation's electric transmission grid is the... for Transmission (RRTT), a collaborative effort involving nine different executive departments and...

  1. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line optionsmore » would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.« less

  2. 18 CFR 40.3 - Availability of Reliability Standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Availability of Reliability Standards. 40.3 Section 40.3 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... THE BULK-POWER SYSTEM § 40.3 Availability of Reliability Standards. The Electric Reliability...

  3. Revenue Sufficiency and Reliability in a Zero Marginal Cost Future

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frew, Bethany A.

    Features of existing wholesale electricity markets, such as administrative pricing rules and policy-based reliability standards, can distort market incentives from allowing generators sufficient opportunities to recover both fixed and variable costs. Moreover, these challenges can be amplified by other factors, including (1) inelastic demand resulting from a lack of price signal clarity, (2) low- or near-zero marginal cost generation, particularly arising from low natural gas fuel prices and variable generation (VG), such as wind and solar, and (3) the variability and uncertainty of this VG. As power systems begin to incorporate higher shares of VG, many questions arise about themore » suitability of the existing marginal-cost-based price formation, primarily within an energy-only market structure, to ensure the economic viability of resources that might be needed to provide system reliability. This article discusses these questions and provides a summary of completed and ongoing modelling-based work at the National Renewable Energy Laboratory to better understand the impacts of evolving power systems on reliability and revenue sufficiency.« less

  4. Aerospace reliability applied to biomedicine.

    NASA Technical Reports Server (NTRS)

    Lalli, V. R.; Vargo, D. J.

    1972-01-01

    An analysis is presented that indicates that the reliability and quality assurance methodology selected by NASA to minimize failures in aerospace equipment can be applied directly to biomedical devices to improve hospital equipment reliability. The Space Electric Rocket Test project is used as an example of NASA application of reliability and quality assurance (R&QA) methods. By analogy a comparison is made to show how these same methods can be used in the development of transducers, instrumentation, and complex systems for use in medicine.

  5. Inter-rater reliability of data elements from a prototype of the Paul Coverdell National Acute Stroke Registry

    PubMed Central

    Reeves, Mathew J; Mullard, Andrew J; Wehner, Susan

    2008-01-01

    Background The Paul Coverdell National Acute Stroke Registry (PCNASR) is a U.S. based national registry designed to monitor and improve the quality of acute stroke care delivered by hospitals. The registry monitors care through specific performance measures, the accuracy of which depends in part on the reliability of the individual data elements used to construct them. This study describes the inter-rater reliability of data elements collected in Michigan's state-based prototype of the PCNASR. Methods Over a 6-month period, 15 hospitals participating in the Michigan PCNASR prototype submitted data on 2566 acute stroke admissions. Trained hospital staff prospectively identified acute stroke admissions, abstracted chart information, and submitted data to the registry. At each hospital 8 randomly selected cases were re-abstracted by an experienced research nurse. Inter-rater reliability was estimated by the kappa statistic for nominal variables, and intraclass correlation coefficient (ICC) for ordinal and continuous variables. Factors that can negatively impact the kappa statistic (i.e., trait prevalence and rater bias) were also evaluated. Results A total of 104 charts were available for re-abstraction. Excellent reliability (kappa or ICC > 0.75) was observed for many registry variables including age, gender, black race, hemorrhagic stroke, discharge medications, and modified Rankin Score. Agreement was at least moderate (i.e., 0.75 > kappa ≥; 0.40) for ischemic stroke, TIA, white race, non-ambulance arrival, hospital transfer and direct admit. However, several variables had poor reliability (kappa < 0.40) including stroke onset time, stroke team consultation, time of initial brain imaging, and discharge destination. There were marked systematic differences between hospital abstractors and the audit abstractor (i.e., rater bias) for many of the data elements recorded in the emergency department. Conclusion The excellent reliability of many of the data elements

  6. The Reliability of Evidence Contained in the National Qualifications Framework Impact Study: A Critical Reflection--Research Article

    ERIC Educational Resources Information Center

    Higgs, Philip; Keevy, James

    2007-01-01

    This article reflects on the reliability of the evidence contained in the National Qualifications Framework Impact Study, a longitudinal comparative study conducted by the South African Qualifications Authority since 2002. In so doing, the veracity of evidence-based research in determining the impact of the South African Qualifications Framework…

  7. Electrical termination techniques

    NASA Technical Reports Server (NTRS)

    Oakey, W. E.; Schleicher, R. R.

    1976-01-01

    A technical review of high reliability electrical terminations for electronic equipment was made. Seven techniques were selected from this review for further investigation, experimental work, and preliminary testing. From the preliminary test results, four techniques were selected for final testing and evaluation. These four were: (1) induction soldering, (2) wire wrap, (3) percussive arc welding, and (4) resistance welding. Of these four, induction soldering was selected as the best technique in terms of minimizing operator errors, controlling temperature and time, minimizing joint contamination, and ultimately producing a reliable, uniform, and reusable electrical termination.

  8. Patient experiences questionnaire for interdisciplinary treatment for substance dependence (PEQ-ITSD): reliability and validity following a national survey in Norway.

    PubMed

    Haugum, Mona; Iversen, Hilde Hestad; Bjertnaes, Oyvind; Lindahl, Anne Karin

    2017-02-20

    Patient experiences are an important aspect of health care quality, but there is a lack of validated instruments for their measurement in the substance dependence literature. A new questionnaire to measure inpatients' experiences of interdisciplinary treatment for substance dependence has been developed in Norway. The aim of this study was to psychometrically test the new questionnaire, using data from a national survey in 2013. The questionnaire was developed based on a literature review, qualitative interviews with patients, expert group discussions and pretesting. Data were collected in a national survey covering all residential facilities with inpatients in treatment for substance dependence in 2013. Data quality and psychometric properties were assessed, including ceiling effects, item missing, exploratory factor analysis, and tests of internal consistency reliability, test-retest reliability and construct validity. The sample included 978 inpatients present at 98 residential institutions. After correcting for excluded patients (n = 175), the response rate was 91.4%. 28 out of 33 items had less than 20.5% of missing data or replies in the "not applicable" category. All but one item met the ceiling effect criterion of less than 50.0% of the responses in the most favorable category. Exploratory factor analysis resulted in three scales: "treatment and personnel", "milieu" and "outcome". All scales showed satisfactory internal consistency reliability (Cronbach's alpha ranged from 0.75-0.91) and test-retest reliability (ICC ranged from 0.82-0.85). 17 of 18 significant associations between single variables and the scales supported construct validity of the PEQ-ITSD. The content validity of the PEQ-ITSD was secured by a literature review, consultations with an expert group and qualitative interviews with patients. The PEQ-ITSD was used in a national survey in Norway in 2013 and psychometric testing showed that the instrument had satisfactory internal consistency

  9. 78 FR 21879 - Improving 9-1-1 Reliability; Reliability and Continuity of Communications Networks, Including...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... maps? What are the public safety and homeland security implications of public disclosure of key network... 13-33] Improving 9-1-1 Reliability; Reliability and Continuity of Communications Networks, Including... improve the reliability and resiliency of the Nation's 9-1-1 networks. The Notice of Proposed Rulemaking...

  10. National Plug-In Electric Vehicle Infrastructure Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, Eric; Rames, Clement; Muratori, Matteo

    This report addresses the fundamental question of how much plug-in electric vehicle (PEV) charging infrastructure—also known as electric vehicle supply equipment (EVSE)—is needed in the United States to support both plug-in hybrid electric vehicles (PHEVs) and battery electric vehicles (BEVs).

  11. 18 CFR 292.308 - Standards for operating reliability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... reliability. 292.308 Section 292.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying... may establish reasonable standards to ensure system safety and reliability of interconnected...

  12. Inverter testing at Sandia National Laboratories

    NASA Astrophysics Data System (ADS)

    Ginn, Jerry W.; Bonn, Russell H.; Sittler, Greg

    1997-02-01

    Inverters are key building blocks of photovoltaic (PV) systems that produce ac power. The balance of systems (BOS) portion of a PV system can account for up to 50% of the system cost, and its reliable operation is essential for a successful PV system. As part of its BOS program, Sandia National Laboratories (SNL) maintains a laboratory wherein accurate electrical measurements of power systems can be made under a variety of conditions. This paper outlines the work that is done in that laboratory.

  13. Revenue Sufficiency and Reliability in a Zero Marginal Cost Future: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frew, Bethany A.; Milligan, Michael; Brinkman, Greg

    Features of existing wholesale electricity markets, such as administrative pricing rules and policy-based reliability standards, can distort market incentives from allowing generators sufficient opportunities to recover both fixed and variable costs. Moreover, these challenges can be amplified by other factors, including (1) inelastic demand resulting from a lack of price signal clarity, (2) low- or near-zero marginal cost generation, particularly arising from low natural gas fuel prices and variable generation (VG), such as wind and solar, and (3) the variability and uncertainty of this VG. As power systems begin to incorporate higher shares of VG, many questions arise about themore » suitability of the existing marginal-cost-based price formation, primarily within an energy-only market structure, to ensure the economic viability of resources that might be needed to provide system reliability. This article discusses these questions and provides a summary of completed and ongoing modelling-based work at the National Renewable Energy Laboratory to better understand the impacts of evolving power systems on reliability and revenue sufficiency.« less

  14. The National Opportunity for Interoperability and its Benefits for a Reliable, Robust, and Future Grid Realized Through Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    Today, increasing numbers of intermittent generation sources (e.g., wind and photovoltaic) and new mobile intermittent loads (e.g., electric vehicles) can significantly affect traditional utility business practices and operations. At the same time, a growing number of technologies and devices, from appliances to lighting systems, are being deployed at consumer premises that have more sophisticated controls and information that remain underused for anything beyond basic building equipment operations. The intersection of these two drivers is an untapped opportunity and underused resource that, if appropriately configured and realized in open standards, can provide significant energy efficiency and commensurate savings on utility bills,more » enhanced and lower cost reliability to utilities, and national economic benefits in the creation of new markets, sectors, and businesses being fueled by the seamless coordination of energy and information through device and technology interoperability. Or, as the Quadrennial Energy Review puts it, “A plethora of both consumer-level and grid-level devices are either in the market, under development, or at the conceptual stage. When tied together through the information technology that is increasingly being deployed on electric utilities’ distribution grids, they can be an important enabling part of the emerging grid of the future. However, what is missing is the ability for all of these devices to coordinate and communicate their operations with the grid, and among themselves, in a common language — an open standard.” In this paper, we define interoperability as the ability to exchange actionable information between two or more systems within a home or building, or across and within organizational boundaries. Interoperability relies on the shared meaning of the exchanged information, with agreed-upon expectations and consequences, for the response to the information exchange.« less

  15. Feasible Electricity Infrastructure Pathways in the Context of Climate-Water Change Constraints

    NASA Astrophysics Data System (ADS)

    Miara, A.; Vorosmarty, C. J.; Macknick, J.; Cohen, S. M.; Tidwell, V. C.; Newmark, R. L.; Fekete, B. M.; Corsi, F.; Sun, Y.; Proussevitch, A. A.; Glidden, S.

    2017-12-01

    The carbon and water intensity of US electricity generation has recently decreased due to the natural gas revolution and deployment of renewable technologies. Yet, power plants that require water for cooling still provide 80% of electricity generation and projected climate-water conditions may limit their power output and affect reliability. Understanding the connections and tradeoffs across water, electricity and climate systems is timely, as the nation tries to mitigate and adapt to a changing climate. Electricity expansion models are used to provide insight on power sector pathways given certain policy goals and economic conditions, but do not typically account for productivity limitations due to physical climate-water constraints. Here, we account for such constraints by coupling an electricity expansion model (Regional Energy Deployment System - ReEDS) with the combined Water Balance and Thermoelectric Power and Thermal Pollution Models (WBM-TP2M), which calculate the available capacity at power plants as a function of hydrologic flows, climate conditions, power plant technology and environmental regulations. To fully capture and incorporate climate-water impacts into ReEDS, a specific rule-set was designed for the temporal and spatial downscaling and up-scaling of ReEDS results into WBM-TP2M inputs and visa versa - required to achieve a modeling `loop' that will enable convergence on a feasible solution in the context of economic and geophysical constraints and opportunities. This novel modeling approach is the next phase of research for understanding electricity system vulnerabilities and adaptation measures using energy-water-climate modeling, which to-date has been limited by a focus on individual generators without analyzing power generation as a collective regional system. This study considers four energy policy/economic pathways under future climate-water resource conditions, designed under the National Energy Water System assessment framework. Results

  16. 78 FR 38851 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... 215 of the Federal Power Act, the Commission proposes to approve the retirement of 34 requirements... of the Reliability Standards. In addition, the Commission proposes to withdraw 41 outstanding...-Power System. This proposal is part of the Commission's ongoing effort to review its requirements and...

  17. Reliable aluminum contact formation by electrostatic bonding

    NASA Astrophysics Data System (ADS)

    Kárpáti, T.; Pap, A. E.; Radnóczi, Gy; Beke, B.; Bársony, I.; Fürjes, P.

    2015-07-01

    The paper presents a detailed study of a reliable method developed for aluminum fusion wafer bonding assisted by the electrostatic force evolving during the anodic bonding process. The IC-compatible procedure described allows the parallel formation of electrical and mechanical contacts, facilitating a reliable packaging of electromechanical systems with backside electrical contacts. This fusion bonding method supports the fabrication of complex microelectromechanical systems (MEMS) and micro-opto-electromechanical systems (MOEMS) structures with enhanced temperature stability, which is crucial in mechanical sensor applications such as pressure or force sensors. Due to the applied electrical potential of  -1000 V the Al metal layers are compressed by electrostatic force, and at the bonding temperature of 450 °C intermetallic diffusion causes aluminum ions to migrate between metal layers.

  18. 77 FR 29995 - Electricity Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... DEPARTMENT OF ENERGY Electricity Advisory Committee AGENCY: Office of Electricity Delivery and... a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L... INFORMATION CONTACT: Matthew Rosenbaum, Office of Electricity Delivery and Energy Reliability, U.S. Department...

  19. 77 FR 58534 - Electricity Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-21

    ... DEPARTMENT OF ENERGY Electricity Advisory Committee AGENCY: Office of Electricity Delivery and... a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L... FURTHER INFORMATION CONTACT: Matthew Rosenbaum, Office of Electricity Delivery and Energy Reliability, U.S...

  20. 78 FR 35539 - Transforming Our Nation's Electric Grid Through Improved Siting, Permitting, and Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ... report to the Steering Committee their progress on meeting the milestones identified pursuant to this... Executive Departments and Agencies Our Nation's electric transmission grid is the backbone of our economy, a... collaborative effort involving nine different executive departments and agencies (agencies), which is working to...

  1. 76 FR 37103 - Electricity Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... DEPARTMENT OF ENERGY Electricity Advisory Committee AGENCY: Office of Electricity Delivery and... a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L...: David Meyer, Office of Electricity Delivery and Energy Reliability, U.S. Department of Energy, Forrestal...

  2. 78 FR 14836 - Notice Pursuant to the National Cooperative Research and Production Act of 1993-Members of SGIP 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-07

    ...; Electric Reliability Council of Texas (ERCOT), Austin, TX; Helikon.net , Washington, DC; Honeywell... Systems Engineering Research Center (PSERC), Tempe, AZ; Samsung Telecommunications America, Richardson, TX... DEPARTMENT OF JUSTICE Antitrust Division Notice Pursuant to the National Cooperative Research and...

  3. 78 FR 55692 - Electricity Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-11

    ... DEPARTMENT OF ENERGY Electricity Advisory Committee AGENCY: Office of Electricity Delivery and... a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L... Electricity Delivery and Energy Reliability, U.S. Department of Energy, Forrestal Building, Room 8G-017, 1000...

  4. The impact of national accreditation reform on survey reliability: a 2-year investigation of survey coordinators' perspectives.

    PubMed

    Greenfield, David; Hogden, Anne; Hinchcliff, Reece; Mumford, Virginia; Pawsey, Marjorie; Debono, Deborah; Westbrook, Johanna I; Braithwaite, Jeffrey

    2016-10-01

    Accrediting health care organizations against standards is a recognized safety and quality intervention. The credibility of an accreditation programme relies on surveying reliability. We investigated accreditation survey coordinators' perceptions of reliability issues and their continued relevancy, during a period of national accreditation reform. In 2013 and 2014, questionnaire surveys were developed using survey coordinators' feedback of their experiences and concerns regarding the accreditation process. Each year, a purpose-designed questionnaire survey was administered during the accrediting agency survey coordinator training days. Participants reported that survey reliability was informed by five categories of issues: the management of the accreditation process, including standards and health care organizational issues; surveyor workforce management; survey coordinator role; survey team; and individual surveyors. A new accreditation system and programme did not alter the factors reported to shape survey reliability. However, across the reform period, there was a noted change within each category of the specific issues that were of concern. Furthermore, consensus between coordinators that existed in 2013 appears to have diminished in 2014. Across all categories, in 2014 there was greater diversity of opinion than in 2013. The known challenges to the reliability of an accreditation programme retained their potency and relevancy during a period of reform. The diversity of opinion identified across the coordinator workforce could potentially place the credibility and reliability of the new scheme at risk. The study highlights that reliability of an accreditation scheme is an ongoing achievement, not a one-off attainment. © 2016 John Wiley & Sons, Ltd.

  5. 75 FR 51025 - Application to Export Electric Energy; Vitol Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... adversely impact on the reliability of the U.S. electric power supply system. Copies of this application... DEPARTMENT OF ENERGY [OE Docket No. EA-370] Application to Export Electric Energy; Vitol Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application...

  6. Reliability, Validity, and Factor Structure of the Current Assessment Practice Evaluation-Revised (CAPER) in a National Sample.

    PubMed

    Lyon, Aaron R; Pullmann, Michael D; Dorsey, Shannon; Martin, Prerna; Grigore, Alexandra A; Becker, Emily M; Jensen-Doss, Amanda

    2018-05-11

    Measurement-based care (MBC) is an increasingly popular, evidence-based practice, but there are no tools with established psychometrics to evaluate clinician use of MBC practices in mental health service delivery. The current study evaluated the reliability, validity, and factor structure of scores generated from a brief, standardized tool to measure MBC practices, the Current Assessment Practice Evaluation-Revised (CAPER). Survey data from a national sample of 479 mental health clinicians were used to conduct exploratory and confirmatory factor analyses, as well as reliability and validity analyses (e.g., relationships between CAPER subscales and clinician MBC attitudes). Analyses revealed competing two- and three-factor models. Regardless of the model used, scores from CAPER subscales demonstrated good reliability and convergent and divergent validity with MBC attitudes in the expected directions. The CAPER appears to be a psychometrically sound tool for assessing clinician MBC practices. Future directions for development and application of the tool are discussed.

  7. Electrical Performance and Reliability Improvement of Amorphous-Indium-Gallium-Zinc-Oxide Thin-Film Transistors with HfO2 Gate Dielectrics by CF4 Plasma Treatment

    PubMed Central

    Fan, Ching-Lin; Tseng, Fan-Ping; Tseng, Chiao-Yuan

    2018-01-01

    In this work, amorphous indium-gallium-zinc oxide thin-film transistors (a-IGZO TFTs) with a HfO2 gate insulator and CF4 plasma treatment was demonstrated for the first time. Through the plasma treatment, both the electrical performance and reliability of the a-IGZO TFT with HfO2 gate dielectric were improved. The carrier mobility significantly increased by 80.8%, from 30.2 cm2/V∙s (without treatment) to 54.6 cm2/V∙s (with CF4 plasma treatment), which is due to the incorporated fluorine not only providing an extra electron to the IGZO, but also passivating the interface trap density. In addition, the reliability of the a-IGZO TFT with HfO2 gate dielectric has also been improved by the CF4 plasma treatment. By applying the CF4 plasma treatment to the a-IGZO TFT, the hysteresis effect of the device has been improved and the device’s immunity against moisture from the ambient atmosphere has been enhanced. It is believed that the CF4 plasma treatment not only significantly improves the electrical performance of a-IGZO TFT with HfO2 gate dielectric, but also enhances the device’s reliability. PMID:29772767

  8. Oak Ridge National Laboratory Wireless Charging of Electric Vehicles - CRADA Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Onar, Omer C.; Campbell, Steven L.; Seiber, Larry Eugene

    Wireless power transfer (WPT) is a paradigm shift in electric-vehicle (EV) charging that offers the consumer an autonomous, safe, and convenient option to conductive charging and its attendant need for cables. With WPT, charging process can be fully automated due to the vehicle and grid side radio communication systems, and is non-contacting; therefore issues with leakage currents, ground faults, and touch potentials do not exist. It also eliminates the need for touching the heavy, bulky, dirty cables and plugs. It eliminates the fear of forgetting to plug-in and running out of charge the following day and eliminates the tripping hazardsmore » in public parking lots and in highly populated areas such as shopping malls, recreational areas, parking buildings, etc. Furthermore, the high-frequency magnetic fields employed in power transfer across a large air gap are focused and shielded, so that fringe fields (i.e., magnetic leakage/stray fields) attenuate rapidly over a transition region to levels well below limits set by international standards for the public zone (which starts at the perimeter of the vehicle and includes the passenger cabin). Oak Ridge National Laboratory s approach to WPT charging places strong emphasis on radio communications in the power regulation feedback channel augmented with software control algorithms. The over-arching goal for WPT is minimization of vehicle on-board complexity by keeping the secondary side content confined to coil tuning, rectification, filtering, and interfacing to the regenerative energy-storage system (RESS). This report summarizes the CRADA work between the Oak Ridge National Laboratory and the Toyota Research Institute of North America, Toyota Motor Engineering and Manufacturing North America (TEMA) on the wireless charging of electric vehicles which was funded by Department of Energy under DE-FOA-000667. In this project, ORNL is the lead agency and Toyota TEMA is one of the major partners. Over the course of the

  9. Product reliability and thin-film photovoltaics

    NASA Astrophysics Data System (ADS)

    Gaston, Ryan; Feist, Rebekah; Yeung, Simon; Hus, Mike; Bernius, Mark; Langlois, Marc; Bury, Scott; Granata, Jennifer; Quintana, Michael; Carlson, Carl; Sarakakis, Georgios; Ogden, Douglas; Mettas, Adamantios

    2009-08-01

    Despite significant growth in photovoltaics (PV) over the last few years, only approximately 1.07 billion kWhr of electricity is estimated to have been generated from PV in the US during 2008, or 0.27% of total electrical generation. PV market penetration is set for a paradigm shift, as fluctuating hydrocarbon prices and an acknowledgement of the environmental impacts associated with their use, combined with breakthrough new PV technologies, such as thin-film and BIPV, are driving the cost of energy generated with PV to parity or cost advantage versus more traditional forms of energy generation. In addition to reaching cost parity with grid supplied power, a key to the long-term success of PV as a viable energy alternative is the reliability of systems in the field. New technologies may or may not have the same failure modes as previous technologies. Reliability testing and product lifetime issues continue to be one of the key bottlenecks in the rapid commercialization of PV technologies today. In this paper, we highlight the critical need for moving away from relying on traditional qualification and safety tests as a measure of reliability and focus instead on designing for reliability and its integration into the product development process. A drive towards quantitative predictive accelerated testing is emphasized and an industrial collaboration model addressing reliability challenges is proposed.

  10. Water chemistry and electrical conductivity database for rivers in Yellowstone National Park, Wyoming

    USGS Publications Warehouse

    Clor, Laura E.; McCleskey, R. Blaine; Huebner, Mark A.; Lowenstern, Jacob B.; Heasler, Henry P.; Mahony, Dan L.; Maloney, Tim; Evans, William C.

    2012-01-01

    This study aims to quantify relations between solute concentrations (especially chloride) and electrical conductivity for several rivers in Yellowstone National Park (YNP), by using automated samplers and conductivity meters. Norton and Friedman (1985) found that chloride concentrations and electrical conductivity have a good correlation in the Falls, Snake, Madison, and Yellowstone Rivers. However, their results are based on limited sampling and hydrologic conditions and their relation with other solutes was not determined. Once the correlations are established, conductivity measurements can then be used as a proxy for chloride concentrations, thereby enabling continuous heat-flow estimation on a much finer timescale and at lower cost than is currently possible with direct sampling. This publication serves as a repository for all data collected during the course of the study from May 2010 through July 2011, but it does not include correlations between solutes and conductivity or recommendations for quantification of chloride through continuous electrical conductivity measurements. This will be the object of a future document.

  11. 75 FR 29336 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... (VSL) assignments for Version 1 of the Critical Infrastructure Protection (CIP) Reliability Standards... Infrastructure Protection Reliability Standards, 130 FERC ] 61,211 at PP 23, 28, 31-33 (2010) (March 18 CIP VSL...

  12. 76 FR 10577 - Electricity Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-25

    ... DEPARTMENT OF ENERGY Electricity Advisory Committee Meeting AGENCY: Office of Electricity Delivery... announces a meeting of the reestablished Electricity Advisory Committee (EAC). The Federal Advisory... CONTACT: David Meyer, Office of Electricity Delivery and Energy Reliability, U.S. Department of Energy...

  13. Structural Testing at the NWTC Helps Improve Blade Design and Increase System Reliability; NREL (National Renewable Energy Laboratory)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2015-08-01

    Since 1990, the National Renewable Energy Laboratory’s (NREL's) National Wind Technology Center (NWTC) has tested more than 150 wind turbine blades. NWTC researchers can test full-scale and subcomponent articles, conduct data analyses, and provide engineering expertise on best design practices. Structural testing of wind turbine blades enables designers, manufacturers, and owners to validate designs and assess structural performance to specific load conditions. Rigorous structural testing can reveal design and manufacturing problems at an early stage of development that can lead to overall improvements in design and increase system reliability.

  14. 75 FR 61454 - Electricity Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... DEPARTMENT OF ENERGY Electricity Advisory Committee AGENCY: Department of Energy, Office of Electricity Delivery and Energy Reliability. ACTION: Notice of open meeting. SUMMARY: This notice announces the open meeting of the re-established DOE Electricity Advisory Committee. The Federal Advisory...

  15. Research on Novel Algorithms for Smart Grid Reliability Assessment and Economic Dispatch

    NASA Astrophysics Data System (ADS)

    Luo, Wenjin

    In this dissertation, several studies of electric power system reliability and economy assessment methods are presented. To be more precise, several algorithms in evaluating power system reliability and economy are studied. Furthermore, two novel algorithms are applied to this field and their simulation results are compared with conventional results. As the electrical power system develops towards extra high voltage, remote distance, large capacity and regional networking, the application of a number of new technique equipments and the electric market system have be gradually established, and the results caused by power cut has become more and more serious. The electrical power system needs the highest possible reliability due to its complication and security. In this dissertation the Boolean logic Driven Markov Process (BDMP) method is studied and applied to evaluate power system reliability. This approach has several benefits. It allows complex dynamic models to be defined, while maintaining its easy readability as conventional methods. This method has been applied to evaluate IEEE reliability test system. The simulation results obtained are close to IEEE experimental data which means that it could be used for future study of the system reliability. Besides reliability, modern power system is expected to be more economic. This dissertation presents a novel evolutionary algorithm named as quantum evolutionary membrane algorithm (QEPS), which combines the concept and theory of quantum-inspired evolutionary algorithm and membrane computation, to solve the economic dispatch problem in renewable power system with on land and offshore wind farms. The case derived from real data is used for simulation tests. Another conventional evolutionary algorithm is also used to solve the same problem for comparison. The experimental results show that the proposed method is quick and accurate to obtain the optimal solution which is the minimum cost for electricity supplied by wind

  16. Approximating genomic reliabilities for national genomic evaluation

    USDA-ARS?s Scientific Manuscript database

    With the introduction of standard methods for approximating effective daughter/data contribution by Interbull in 2001, conventional EDC or reliabilities contributed by daughter phenotypes are directly comparable across countries and used in routine conventional evaluations. In order to make publishe...

  17. Magnetically operated limit switch has improved reliability, minimizes arcing

    NASA Technical Reports Server (NTRS)

    Steiner, R.

    1966-01-01

    Limit switch for reliable, low-travel, snap action with negligible arcing uses an electrically nonconductive permanent magnet consisting of a ferrimagnetic ceramic and ferromagnetic pole shoes which form a magnetic and electrically conductive circuit with a ferrous-metal armature.

  18. 76 FR 71966 - Notice of Commissioner and Staff Attendance at ReliabilityFirst

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... Attendance at ReliabilityFirst Corporation Meetings The Federal Energy Regulatory Commission hereby gives...: ReliabilityFirst Corporation, Annual Meeting of Members and Board of Directors Meetings, Grand Hyatt... Reliability Corporation Docket No. RC11-1, North American Electric Reliability Corporation Docket No. RC11-2...

  19. Returning vacationers face heavy reading loads. [Reports, surveys and projections on the national energy supply

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, T.F.

    1991-10-01

    This article reviews the various reports, surveys and projections on the national energy supply of the summer of 1991. Discussed are the natural gas supplies, competitive electric power production, reliability of independent power, public attitudes toward natural gas, the market share of natural gas, and projection of US energy supply and demand.

  20. Stirling Convertor Fasteners Reliability Quantification

    NASA Technical Reports Server (NTRS)

    Shah, Ashwin R.; Korovaichuk, Igor; Kovacevich, Tiodor; Schreiber, Jeffrey G.

    2006-01-01

    Onboard Radioisotope Power Systems (RPS) being developed for NASA s deep-space science and exploration missions require reliable operation for up to 14 years and beyond. Stirling power conversion is a candidate for use in an RPS because it offers a multifold increase in the conversion efficiency of heat to electric power and reduced inventory of radioactive material. Structural fasteners are responsible to maintain structural integrity of the Stirling power convertor, which is critical to ensure reliable performance during the entire mission. Design of fasteners involve variables related to the fabrication, manufacturing, behavior of fasteners and joining parts material, structural geometry of the joining components, size and spacing of fasteners, mission loads, boundary conditions, etc. These variables have inherent uncertainties, which need to be accounted for in the reliability assessment. This paper describes these uncertainties along with a methodology to quantify the reliability, and provides results of the analysis in terms of quantified reliability and sensitivity of Stirling power conversion reliability to the design variables. Quantification of the reliability includes both structural and functional aspects of the joining components. Based on the results, the paper also describes guidelines to improve the reliability and verification testing.

  1. Exchange biased and closed-flux pseudo spin-valve materials, device applications, and electrical reliability

    NASA Astrophysics Data System (ADS)

    Bae, Seongtae

    can be promisingly substituted for current microelectronic devices. Finally, the last is to focus on studying electrical reliability of GMR read sensor and GMR MRAM cell in terms of electromigration-induced failures of various kinds of magnetic thin films, which are currently used in GMR spin-valve materials, and is to investigate the effects of current (or voltage) induced dielectric breakdown in aluminum oxide tunnel barrier under various testing conditions on the electrical stability of real TMR read sensors.

  2. FY2011 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olszewski, Mitchell

    The U.S. Department of Energy (DOE) announced in May 2011 a new cooperative research effort comprising DOE, the U.S. Council for Automotive Research (composed of automakers Ford Motor Company, General Motors Company, and Chrysler Group), Tesla Motors, and representatives of the electric utility and petroleum industries. Known as U.S. DRIVE (Driving Research and Innovation for Vehicle efficiency and Energy sustainability), it represents DOE's commitment to developing public-private partnerships to fund high risk-high reward research into advanced automotive technologies. The new partnership replaces and builds upon the partnership known as FreedomCAR (derived from 'Freedom' and 'Cooperative Automotive Research') that ran frommore » 2002 through 2010 and the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. The Oak Ridge National Laboratory's (ORNL's) Power Electronics and Electric Machines (PEEM) subprogram within the DOE Vehicle Technologies Program (VTP) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE), electric motor (EM), and traction drive system technologies that will leapfrog current on-the-road technologies. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow's automobiles will function as a unified system to improve fuel efficiency. In supporting the development of advanced vehicle propulsion systems, the PEEM subprogram has enabled the development of technologies that will significantly improve efficiency, costs, and fuel economy. The PEEM subprogram supports the efforts of the U.S. DRIVE partnership through a three phase approach intended to: (1) identify overall propulsion and vehicle related needs by analyzing programmatic goals and reviewing industry's recommendations and requirements

  3. Thin-film reliability and engineering overview

    NASA Technical Reports Server (NTRS)

    Ross, R. G., Jr.

    1984-01-01

    The reliability and engineering technology base required for thin film solar energy conversions modules is discussed. The emphasis is on the integration of amorphous silicon cells into power modules. The effort is being coordinated with SERI's thin film cell research activities as part of DOE's Amorphous Silicon Program. Program concentration is on temperature humidity reliability research, glass breaking strength research, point defect system analysis, hot spot heating assessment, and electrical measurements technology.

  4. Thin-film reliability and engineering overview

    NASA Astrophysics Data System (ADS)

    Ross, R. G., Jr.

    1984-10-01

    The reliability and engineering technology base required for thin film solar energy conversions modules is discussed. The emphasis is on the integration of amorphous silicon cells into power modules. The effort is being coordinated with SERI's thin film cell research activities as part of DOE's Amorphous Silicon Program. Program concentration is on temperature humidity reliability research, glass breaking strength research, point defect system analysis, hot spot heating assessment, and electrical measurements technology.

  5. Electric Power Annual

    EIA Publications

    2016-01-01

    The Electric Power Annual 2015 presents 11 years (2005-15) of national-level data on electricity generating capacity, electricity generation and useful thermal output, fuel receipts, consumption, and emissions.

  6. Effect of global warming on willingness to pay for uninterrupted electricity supply in European nations

    NASA Astrophysics Data System (ADS)

    Cohen, Jed; Moeltner, Klaus; Reichl, Johannes; Schmidthaler, Michael

    2018-01-01

    Predicted changes in temperature and other weather events may damage the electricity grid and cause power outages. Understanding the costs of power outages and how these costs change over time with global warming can inform outage-mitigation-investment decisions. Here we show that across 19 EU nations the value of uninterrupted electricity supply is strongly related to local temperatures, and will increase as the climate warms. Bayesian hierarchical modelling of data from a choice experiment and respondent-specific temperature measures reveals estimates of willingness to pay (WTP) to avoid an hour of power outage between €0.32 and €1.86 per household. WTP varies on the basis of season and is heterogeneous between European nations. Winter outages currently cause larger per household welfare losses than summer outages per hour of outage. However, this dynamic will begin to shift under plausible future climates, with summer outages becoming substantially more costly and winter outages becoming slightly less costly on a per-household, per-hour basis.

  7. 78 FR 22773 - Revisions to Reliability Standard for Transmission Vegetation Management; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ...; Order No. 777] Revisions to Reliability Standard for Transmission Vegetation Management; Correction... other requirements the North American Electric Reliability Corporation (NERC) needs to submit when modifying certain Reliability Standards. DATES: Effective on May 28, 2013. FOR FURTHER INFORMATION CONTACT...

  8. 78 FR 44909 - Regional Reliability Standard BAL-002-WECC-2-Contingency Reserve

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-25

    ...] Regional Reliability Standard BAL-002-WECC-2--Contingency Reserve AGENCY: Federal Energy Regulatory...-002-WECC-2 (Contingency Reserve). The North American Electric Reliability Corporation (NERC) and... contingency reserve required to ensure reliability under normal and abnormal conditions. The Commission also...

  9. Power Quality and Reliability Project

    NASA Technical Reports Server (NTRS)

    Attia, John O.

    2001-01-01

    One area where universities and industry can link is in the area of power systems reliability and quality - key concepts in the commercial, industrial and public sector engineering environments. Prairie View A&M University (PVAMU) has established a collaborative relationship with the University of'Texas at Arlington (UTA), NASA/Johnson Space Center (JSC), and EP&C Engineering and Technology Group (EP&C) a small disadvantage business that specializes in power quality and engineering services. The primary goal of this collaboration is to facilitate the development and implementation of a Strategic Integrated power/Systems Reliability and Curriculum Enhancement Program. The objectives of first phase of this work are: (a) to develop a course in power quality and reliability, (b) to use the campus of Prairie View A&M University as a laboratory for the study of systems reliability and quality issues, (c) to provide students with NASA/EPC shadowing and Internship experience. In this work, a course, titled "Reliability Analysis of Electrical Facilities" was developed and taught for two semesters. About thirty seven has benefited directly from this course. A laboratory accompanying the course was also developed. Four facilities at Prairie View A&M University were surveyed. Some tests that were performed are (i) earth-ground testing, (ii) voltage, amperage and harmonics of various panels in the buildings, (iii) checking the wire sizes to see if they were the right size for the load that they were carrying, (iv) vibration tests to test the status of the engines or chillers and water pumps, (v) infrared testing to the test arcing or misfiring of electrical or mechanical systems.

  10. 75 FR 32357 - Gallatin National Forest; Montana; Jack Rabbit to Big Sky Meadow Village 161 kV Transmission Line...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... DEPARTMENT OF AGRICULTURE Forest Service Gallatin National Forest; Montana; Jack Rabbit to Big Sky... electric transmission line. The upgraded 161-kV transmission line would connect the existing Jack Rabbit... with eight regional entities to improve the reliability of the bulk power system. The Jack Rabbit to...

  11. Photovoltaic power system reliability considerations

    NASA Technical Reports Server (NTRS)

    Lalli, V. R.

    1980-01-01

    An example of how modern engineering and safety techniques can be used to assure the reliable and safe operation of photovoltaic power systems is presented. This particular application is for a solar cell power system demonstration project designed to provide electric power requirements for remote villages. The techniques utilized involve a definition of the power system natural and operating environment, use of design criteria and analysis techniques, an awareness of potential problems via the inherent reliability and FMEA methods, and use of fail-safe and planned spare parts engineering philosophy.

  12. Potential Impact of the National Plan for Future Electric Power Supply on Air Quality in Korea

    NASA Astrophysics Data System (ADS)

    Shim, C.; Hong, J.

    2014-12-01

    Korean Ministry of Trade, Industry and Energy (MOTIE) announced the national plan for Korea's future electric power supply (2013 - 2027) in 2013. According to the plan, the national demand for electricity will be increased by 60% compared to that of 2010 and primary energy sources for electric generation will still lean on the fossil fuels such as petroleum, LNG, and coal, which would be a potential threat to air quality of Korea. This study focused on two subjects: (1) How the spatial distribution of the primary air pollutant's emissions (i.e., NOx, SOx, CO, PM) will be changed and (2) How the primary emission changes will influence on the national ambient air quality including ozone in 2027. We used GEOS-Chem model simulation with modification of Korean emissions inventory (Clean Air Policy Support System (CAPSS)) to simulate the current and future air quality in Korea. The national total emissions of CO, NOx, SOx, PM in year 2027 will be increased by 3%, 8%, 13%, 2%, respectively compared to 2010 and there are additional concern that the future location of the power plants will be closer to the Seoul Metropolitan Area (SMA), where there are approximately 20 million population vulnerable to the potentially worsened air quality. While there are slight increase of concentration of CO, NOx, SOx, and PM in 2027, the O3 concentration is expected to be similar to the level of 2010. Those results may imply the characteristics of air pollution in East Asia such as potentially severe O3 titration and poorer O3/CO or O3/NOx ratio. Furthermore, we will discuss on the impact of transboundary pollution transport from China in the future, which is one of the large factors to control the air quality of Korea.

  13. 75 FR 72909 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ...) Comments 135 (b) Commission Determination 139 6. Impact on Generation Owners and Operators 142 (a) Comments... Organization, the electrical generation resources, transmission lines, interconnections with neighboring... above that interconnect with registered generation facilities are excluded from NPCC's list of bulk...

  14. Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuiper, James A.; Krummel, John R.; Hlava, Kevin J.

    As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to studymore » routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines.« less

  15. Blow molding electric drives of Mechanical Engineering

    NASA Astrophysics Data System (ADS)

    Bukhanov, S. S.; Ramazanov, M. A.; Tsirkunenko, A. T.

    2018-03-01

    The article considers the questions about the analysis of new possibilities, which gives the use of adjustable electric drives for blowing mechanisms of plastic production. Thus, the use of new semiconductor converters makes it possible not only to compensate the instability of the supply network by using special dynamic voltage regulators, but to improve (correct) the power factor. The calculation of economic efficiency in controlled electric drives of blowing mechanisms is given. On the basis of statistical analysis, the calculation of the reliability parameters of the regulated electric drives’ elements under consideration is given. It is shown that an increase in the reliability of adjustable electric drives is possible both due to overestimation of the electric drive’s installed power, and in simpler schemes with pulse-vector control.

  16. Reliability Modeling of Microelectromechanical Systems Using Neural Networks

    NASA Technical Reports Server (NTRS)

    Perera. J. Sebastian

    2000-01-01

    Microelectromechanical systems (MEMS) are a broad and rapidly expanding field that is currently receiving a great deal of attention because of the potential to significantly improve the ability to sense, analyze, and control a variety of processes, such as heating and ventilation systems, automobiles, medicine, aeronautical flight, military surveillance, weather forecasting, and space exploration. MEMS are very small and are a blend of electrical and mechanical components, with electrical and mechanical systems on one chip. This research establishes reliability estimation and prediction for MEMS devices at the conceptual design phase using neural networks. At the conceptual design phase, before devices are built and tested, traditional methods of quantifying reliability are inadequate because the device is not in existence and cannot be tested to establish the reliability distributions. A novel approach using neural networks is created to predict the overall reliability of a MEMS device based on its components and each component's attributes. The methodology begins with collecting attribute data (fabrication process, physical specifications, operating environment, property characteristics, packaging, etc.) and reliability data for many types of microengines. The data are partitioned into training data (the majority) and validation data (the remainder). A neural network is applied to the training data (both attribute and reliability); the attributes become the system inputs and reliability data (cycles to failure), the system output. After the neural network is trained with sufficient data. the validation data are used to verify the neural networks provided accurate reliability estimates. Now, the reliability of a new proposed MEMS device can be estimated by using the appropriate trained neural networks developed in this work.

  17. Assessing the Dimensionality and Reliability of Teachers' Performance Evaluation in Eastern Zone High Schools, Tigrai National Regional State, Ethiopia

    ERIC Educational Resources Information Center

    Embiza, Samuel; Hadush, Selamawit

    2015-01-01

    The purpose of this study was to assess the dimensionality and reliability of Teachers Evaluation Questionnaire in Eastern Zone high school; Tigrai National Regional State which was filled by school principal. To this end: 9 high schools in 7 woredas were selected using the lottery method, in which 459 teachers' rate forms were collected. All…

  18. Answer to the dynamic (fretting effect) and static (oxide) behavior of electric contact surfaces: based on a five-year infrared thermographic study

    NASA Astrophysics Data System (ADS)

    Paez-Leon, Cristobal D.; Patino, Antonio R.; Aguillon, Luis

    1991-03-01

    This paper describes the results of a five-year study carried out in 38 power substations (230, 115, 34.5 and 13.8 Kv), located in the Western power electric system of CADAFE (Venezuela's national Electric Utility). A total of 154 hot spots were found between 1980 and 1982, a time span considered a reliable source of information in connection with methodology, term and results. The distribution of hot spots found during those years was 77, 33 and 44. The reduction of the spot/substation parameter was found to be 4.1, 3.3 and 3.1, respectively. Every item detected could have been the cause of major interruptions, locally and regionally, or even the system's blackout. The methodology used to determine the major concentration of findings and their location on the equipment, followed the sequence of Pareto's Diagram and Ishikawa's Graphic. Based on the results of the study whose results are presented here, a lubricant and compound-aid connector for Al-Al and bimetallic electric connections was formulated, developed, manufactured, tested (at IREQ laboratories) and traded (CONECTECH CAC- 01). To date, the whole process represents 12 years of work. The connector's behavior and reliability are being tested throughout Venezuela's national electric system (responsible for the supply of around 50,000 Gwh/year) with the use of 12 Tons of CONECTECH CAC-01.

  19. FY2009 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olszewski, Mitchell

    The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and Chrysler) announced in January 2002 a new cooperative research effort. Known as FreedomCAR (derived from 'Freedom' and 'Cooperative Automotive Research'), it represents DOE's commitment to developing public/private partnerships to fund high-risk, high-payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieve the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ran from 1993more » through 2001. The Oak Ridge National Laboratory's (ORNL's) Advanced Power Electronics and Electric Machines (APEEM) subprogram within the Vehicle Technologies Program provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on understanding and improving the way the various new components of tomorrow's automobiles will function as a unified system to improve fuel efficiency. In supporting the development of advanced vehicle propulsion systems, the APEEM effort has enabled the development of technologies that will significantly improve efficiency, costs, and fuel economy. The APEEM subprogram supports the efforts of the FreedomCAR and Fuel Partnership through a three-phase approach intended to: (1) identify overall propulsion and vehicle-related needs by analyzing programmatic goals and reviewing industry's recommendations and requirements and then develop the appropriate technical targets for systems, subsystems, and component research and development activities; (2) develop and validate individual subsystems and components, including electric motors and power electronics; and (3) determine how well the components and subsystems work together in a vehicle environment or as a complete

  20. Effects of Nitrogen and Hydrogen Codoping on the Electrical Performance and Reliability of InGaZnO Thin-Film Transistors.

    PubMed

    Abliz, Ablat; Gao, Qingguo; Wan, Da; Liu, Xingqiang; Xu, Lei; Liu, Chuansheng; Jiang, Changzhong; Li, Xuefei; Chen, Huipeng; Guo, Tailiang; Li, Jinchai; Liao, Lei

    2017-03-29

    Despite intensive research on improvement in electrical performances of ZnO-based thin-film transistors (TFTs), the instability issues have limited their applications for complementary electronics. Herein, we have investigated the effect of nitrogen and hydrogen (N/H) codoping on the electrical performance and reliability of amorphous InGaZnO (α-IGZO) TFTs. The performance and bias stress stability of α-IGZO device were simultaneously improved by N/H plasma treatment with a high field-effect mobility of 45.3 cm 2 /(V s) and small shifts of threshold voltage (V th ). On the basis of X-ray photoelectron spectroscopy analysis, the improved electrical performances of α-IGZO TFT should be attributed to the appropriate amount of N/H codoping, which could not only control the V th and carrier concentration efficiently, but also passivate the defects such as oxygen vacancy due to the formation of stable Zn-N and N-H bonds. Meanwhile, low-frequency noise analysis indicates that the average trap density near the α-IGZO/SiO 2 interface is reduced by the nitrogen and hydrogen plasma treatment. This method could provide a step toward the development of α-IGZO TFTs for potential applications in next-generation high-definition optoelectronic displays.

  1. Evaluating the Impacts of Climate Change on the Operations and Future Development of the U.S. Electricity System

    NASA Astrophysics Data System (ADS)

    Newmark, R. L.; Cohen, S. M.; Averyt, K.; Macknick, J.; Meldrum, J.; Sullivan, P.

    2014-12-01

    Climate change has the potential to exacerbate reliability concerns for the power sector through changes in water availability and air temperatures. The power sector is responsible for 41% of U.S. freshwater withdrawals, primarily for power plant cooling needs, and any changes in the water available for the power sector, given increasing competition among water users, could affect decisions about new power plant builds and reliable operations for existing generators. Similarly, increases in air temperatures can reduce power plant efficiencies, which in turn increases fuel consumption as well as water withdrawal and consumption rates. This analysis describes an initial link between climate, water, and electricity systems using the National Renewable Energy Laboratory's (NREL) Regional Energy Deployment System (ReEDS) electricity system capacity expansion model. Average surface water runoff projections from Coupled Model Intercomparison Project 5 (CMIP5) data are applied to surface water available to generating capacity in ReEDS, and electric sector growth is compared with and without climate-influenced water availability for the 134 electricity balancing regions in the ReEDS model. In addition, air temperature changes are considered for their impacts on electricity load, transmission capacity, and power plant efficiencies and water use rates. Mean climate projections have only a small impact on national or regional capacity growth and water use because most regions have sufficient unappropriated or previously retired water access to offset climate impacts. Climate impacts are notable in southwestern states, which experience reduced water access purchases and a greater share of water acquired from wastewater and other higher-cost water resources. The electric sector climate impacts demonstrated herein establish a methodology to be later exercised with more extreme climate scenarios and a more rigorous representation of legal and physical water availability.

  2. Socio-economic benefits of electric power

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clemente, F.

    1979-01-01

    Empirical evidence and actual experience strongly demonstrate that the socio-economic benefits of electric power have received less than adequate attention. In terms of the reliability issue, so much emphasis has been placed on the cost of having electricity that the cost of not having reliable power has been ignored. Apart from a few comments on jobs or taxes, the Environmental Impact Statements submitted by utilities generally ignore the broad range of socio-economic (quality of life) benefits the proposed facility will have for the local community, the region, and society at large. The author feels strongly that electric utilities should notmore » look askance at the soft sciences, but should begin to utilize them. Sociology, social welfare, and macroeconomics remain fertile ground for the electric-power industry. The techniques and concepts of the social sciences can be readily utilized to identify and document many heretofore unarticulated socio-economic benefits of electric power.« less

  3. Procedure for contact electrical resistance measurements as developed for use at Sandia National Laboratories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finch, J.L.

    1994-06-01

    Military Specifications call out general procedures and guidelines for conducting contact resistance measurements on chemical conversion coated panels. This paper deals with a test procedure developed at Sandia National Laboratories used to conduct contact electrical resistance on non-chromated conversion coated test panels. MIL-C-81706 {open_quotes}Chemical Conversion Materials For Coating Aluminum and Aluminum Alloys{close_quotes} was the reference specification used for guidance.

  4. Improvement of the Reliability of Dielectrics for MLCC

    NASA Astrophysics Data System (ADS)

    Nakamura, Tomoyuki; Yao, Takayuki; Ikeda, Jun; Kubodera, Noriyuki; Takagi, Hiroshi

    2011-10-01

    To achieve enough reliability of monolithic ceramic capacitor, it is important to know the contribution of grain boundary and grain interior to its reliability and insulation resistance. As the number of grain boundaries per layer increased, mean time to failure (MTTF) increased. In addition, as the number of grain boundaries per layer increased, samples showed lower current leakage in the measured electric field range. Using these data, the grain boundary E-J curves were determined by simulation. As a result, temperature and electric field dependence of insulation resistance of grain boundary were very low. The insulation characteristics of one BaTiO3 grain per layer were examined. The resistance and reliability of grain interior were very low. To improve the degradation resistance of grain interior, Ca-doped BaTiO3-based dielectrics were developed. The influence of Ca substitution on MTTF was investigated and it was found out that MTTF increased with the increase of Ca substitution.

  5. 78 FR 44557 - Revision to Transmission Vegetation Management Reliability Standard; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... Transmission Vegetation Management Reliability Standard; Notice of Compliance Filing Take notice that on July 12, 2013, the North American Electric Reliability Corporation (NERC), pursuant to Order No. 777 \\1... Reliability Standard FAC-003-2 to its Web site. \\1\\ Revisions to Reliability Standard for Transmission...

  6. The National Aeronautics and Space Administration Nondestructive Evaluation Program for Safe and Reliable Operations

    NASA Technical Reports Server (NTRS)

    Generazio, Ed

    2005-01-01

    The National Aeronautics and Space Administration (NASA) Nondestructive Evaluation (NDE) Program is presented. As a result of the loss of seven astronauts and the Space Shuttle Columbia on February 1, 2003, NASA has undergone many changes in its organization. NDE is one of the key areas that are recognized by the Columbia Accident Investigation Board (CAIB) that needed to be strengthened by warranting NDE as a discipline with Independent Technical Authority (iTA). The current NASA NDE system and activities are presented including the latest developments in inspection technologies being applied to the Space Transportation System (STS). The unfolding trends and directions in NDE for the future are discussed as they apply to assuring safe and reliable operations.

  7. Test-Retest Reliability of the National Health and Nutrition Examination Survey’s 5-Question Food Insecurity Survey Completed by Fourth-Grade Children

    PubMed Central

    Baxter, Suzanne D.; Smith, Albert F.; Hitchcock, David B.; Collins, Kathleen L.; Guinn, Caroline H.; Finney, Christopher J.; Royer, Julie A.; Miller, Patricia H.

    2015-01-01

    Objective To examine test-retest reliability and internal consistency of a 5-question food insecurity survey used in the National Health and Nutrition Examination Survey. Methods Researchers administered the National Health and Nutrition Examination Survey in the classroom to 92 fourth-grade children (74 African American; 48 girls) in 2 sessions 27–30 days apart in spring, 2011. Each classroom administration lasted 5–10 minutes. Results Test-retest reliability was 0.66 (Kendall tau), which is modest. Internal consistency (Cronbach alpha) was .67 and .70 for respective administrations. Food insecurity scores were related to gender (adjusted P = .05) and academic achievement (adjusted P = .004) but not to socioeconomic status or body mass index percentile (binomial regression). On average, boys reported higher food insecurity than girls. Children with lower academic achievement scores reported higher food insecurity than children with higher academic achievement scores. Conclusions and Implications The National Health and Nutrition Examination 5-question survey may be group administered to assess food insecurity efficiently as reported by individual fourth-grade children. PMID:26363937

  8. Bridging Climate Change Resilience and Mitigation in the Electricity Sector Through Renewable Energy and Energy Efficiency: Emerging Climate Change and Development Topics for Energy Sector Transformation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cox, Sarah L; Hotchkiss, Elizabeth L; Bilello, Daniel E

    Reliable, safe, and secure electricity is essential for economic and social development and a necessary input for many sectors of the economy. However, electricity generation and associated processes make up a significant portion of global greenhouse gas (GHG) emissions contributing to climate change. Furthermore, electricity systems are vulnerable to climate change impacts - both short-term events and changes over the longer term. This vulnerability presents both near-term and chronic challenges in providing reliable, affordable, equitable, and sustainable energy services. Within this context, developing countries face a number of challenges in the energy sector, including the need to reliably meet growingmore » electricity demand, lessen dependence on imported fuels, expand energy access, and improve stressed infrastructure for fuel supply and electricity transmission. Energy efficiency (EE) and renewable energy (RE) technical solutions described in this paper can bridge action across climate change mitigation and resilience through reducing GHG emissions and supporting electric power sector adaptation to increasing climate risk. Integrated planning approaches, also highlighted in this paper, play an integral role in bringing together mitigation and resilience action under broader frameworks. Through supporting EE and RE deployment and integrated planning approaches, unique to specific national and local circumstances, countries can design and implement policies, strategies, and sectoral plans that unite development priorities, climate change mitigation, and resilience.« less

  9. Electric machine differential for vehicle traction control and stability control

    NASA Astrophysics Data System (ADS)

    Kuruppu, Sandun Shivantha

    Evolving requirements in energy efficiency and tightening regulations for reliable electric drivetrains drive the advancement of the hybrid electric (HEV) and full electric vehicle (EV) technology. Different configurations of EV and HEV architectures are evaluated for their performance. The future technology is trending towards utilizing distinctive properties in electric machines to not only to improve efficiency but also to realize advanced road adhesion controls and vehicle stability controls. Electric machine differential (EMD) is such a concept under current investigation for applications in the near future. Reliability of a power train is critical. Therefore, sophisticated fault detection schemes are essential in guaranteeing reliable operation of a complex system such as an EMD. The research presented here emphasize on implementation of a 4kW electric machine differential, a novel single open phase fault diagnostic scheme, an implementation of a real time slip optimization algorithm and an electric machine differential based yaw stability improvement study. The proposed d-q current signature based SPO fault diagnostic algorithm detects the fault within one electrical cycle. The EMD based extremum seeking slip optimization algorithm reduces stopping distance by 30% compared to hydraulic braking based ABS.

  10. Reliability and validity of an arabic version of the dyspnea-12 questionnaire for Saudi nationals with chronic obstructive pulmonary disease.

    PubMed

    Alyami, Mohammed M; Jenkins, Sue C; Lababidi, Hani; Hill, Kylie

    2015-01-01

    Dyspnea is a distressing symptom experienced by people with chronic obstructive pulmonary disease (COPD). The dyspnea-12 (D-12) questionnaire comprises of 12 items and assesses the quality of this symptom, its severity and the emotional response. The original (English) version of the D-12 is reliable and valid for the measurement of dyspnea in pulmonary diseases. To translate the D-12 into Arabic and determine whether this version is reliable and valid in Saudi nationals with COPD. The D-12 was translated into Arabic version and reviewed by an expert panel before being back-translated into English. The Arabic version was administered to five patients with COPD to test whether it was easily understood after which a final Arabic version was produced. Thereafter, 40 patients with COPD (aged 63 ΁ 9 years; 33 [82.5%] males; forced expiratory volume in one second (FEV 1) 47 ΁ 16% predicted) completed the D-12, the COPD Assessment Test (CAT) and the Chronic Respiratory Disease Questionnaire (CRDQ). Lung function and 6-minute walk distance were also measured. The D-12 was re-administered two weeks later. The Arabic version of the D-12 demonstrated good reliability over the two administration (intraclass correlation coefficient = 0.94, P = 0.01). Strong associations were demonstrated between the (1) total score for the D-12 and the CAT, (2) quality sub-score of the D-12 and the CAT and (3) emotional response sub-score of the D-12 and emotional function domain of the CRDQ (r ≥ 0.6, all P < 0.01). The Arabic version of the D-12 is a reliable and valid instrument in Saudi nationals with COPD.

  11. Improving the estimated cost of sustained power interruptions to electricity customers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaCommare, Kristina Hamachi; Eto, Joseph H.; Dunn, Laurel N.

    Electricity reliability and resiliency have become a topic of heightened interest in recent years in the United States. As utilities, regulators, and policymakers determine how to achieve optimal levels of electricity reliability while considering how best to prepare for future disruptions in power, the related issue of how much it costs when customers lose power remains a largely unanswered question. In 2006, Lawrence Berkeley National Laboratory developed an end-use based framework that estimates the cost of power interruptions in the U.S that has served as a foundational paper using the best available, yet far from perfect, information at that time.more » Since then, an abundance of work has been done to improve the quality and availability of information that now allow us to make a much more robust assessment of the cost of power interruptions to U.S. customers. In this paper, we find that the total U.S. cost of sustained power interruptions is 44 billion dollars per year (2015-) -25% more than the 26 billion dollars per year in 2002- (or 35 billion dollars per year in 2015-) estimated in our 2006 study.« less

  12. Improving the estimated cost of sustained power interruptions to electricity customers

    DOE PAGES

    LaCommare, Kristina Hamachi; Eto, Joseph H.; Dunn, Laurel N.; ...

    2018-04-18

    Electricity reliability and resiliency have become a topic of heightened interest in recent years in the United States. As utilities, regulators, and policymakers determine how to achieve optimal levels of electricity reliability while considering how best to prepare for future disruptions in power, the related issue of how much it costs when customers lose power remains a largely unanswered question. In 2006, Lawrence Berkeley National Laboratory developed an end-use based framework that estimates the cost of power interruptions in the U.S that has served as a foundational paper using the best available, yet far from perfect, information at that time.more » Since then, an abundance of work has been done to improve the quality and availability of information that now allow us to make a much more robust assessment of the cost of power interruptions to U.S. customers. In this paper, we find that the total U.S. cost of sustained power interruptions is 44 billion dollars per year (2015-) -25% more than the 26 billion dollars per year in 2002- (or 35 billion dollars per year in 2015-) estimated in our 2006 study.« less

  13. Electric organ discharges and electric images during electrolocation

    NASA Technical Reports Server (NTRS)

    Assad, C.; Rasnow, B.; Stoddard, P. K.

    1999-01-01

    Weakly electric fish use active electrolocation - the generation and detection of electric currents - to explore their surroundings. Although electrosensory systems include some of the most extensively understood circuits in the vertebrate central nervous system, relatively little is known quantitatively about how fish electrolocate objects. We believe a prerequisite to understanding electrolocation and its underlying neural substrates is to quantify and visualize the peripheral electrosensory information measured by the electroreceptors. We have therefore focused on reconstructing both the electric organ discharges (EODs) and the electric images resulting from nearby objects and the fish's exploratory behaviors. Here, we review results from a combination of techniques, including field measurements, numerical and semi-analytical simulations, and video imaging of behaviors. EOD maps are presented and interpreted for six gymnotiform species. They reveal diverse electric field patterns that have significant implications for both the electrosensory and electromotor systems. Our simulations generated predictions of the electric images from nearby objects as well as sequences of electric images during exploratory behaviors. These methods are leading to the identification of image features and computational algorithms that could reliably encode electrosensory information and may help guide electrophysiological experiments exploring the neural basis of electrolocation.

  14. Reliability Testing of NASA Piezocomposite Actuators

    NASA Technical Reports Server (NTRS)

    Wilkie, W.; High, J.; Bockman, J.

    2002-01-01

    NASA Langley Research Center has developed a low-cost piezocomposite actuator which has application for controlling vibrations in large inflatable smart space structures, space telescopes, and high performance aircraft. Tests show the NASA piezocomposite device is capable of producing large, directional, in-plane strains on the order of 2000 parts-per-million peak-to-peak, with no reduction in free-strain performance to 100 million electrical cycles. This paper describes methods, measurements, and preliminary results from our reliability evaluation of the device under externally applied mechanical loads and at various operational temperatures. Tests performed to date show no net reductions in actuation amplitude while the device was moderately loaded through 10 million electrical cycles. Tests were performed at both room temperature and at the maximum operational temperature of the epoxy resin system used in manufacture of the device. Initial indications are that actuator reliability is excellent, with no actuator failures or large net reduction in actuator performance.

  15. Development and Performance of Alternative Electricity Sector Pathways Subject to Multiple Climate and Water Projections

    NASA Astrophysics Data System (ADS)

    Newmark, R. L.; Vorosmarty, C. J.; Miara, A.; Cohen, S.; Macknick, J.; Sun, Y.; Corsi, F.; Fekete, B. M.; Tidwell, V. C.

    2017-12-01

    Climate change impacts on air temperatures and water availability have the potential to alter future electricity sector investment decisions as well as the reliability and performance of the power sector. Different electricity sector configurations are more or less vulnerable to climate-induced changes. For example, once-through cooled thermal facilities are the most cost-effective and efficient technologies under cooler and wetter conditions, but can be substantially affected by and vulnerable to warmer and drier conditions. Non-thermal renewable technologies, such as PV and wind, are essentially "drought-proof" but have other integration and reliability challenges. Prior efforts have explored the impacts of climate change on electric sector development for a limited set of climate and electricity scenarios. Here, we provide a comprehensive suite of scenarios that evaluate how different electricity sector pathways could be affected by a range of climate and water resource conditions. We use four representative concentration pathway (RCP) scenarios under five global circulation models (GCM) as climate drivers to a Water Balance Model (WBM), to provide twenty separate future climate-water conditions. These climate-water conditions influence electricity sector development from present day to 2050 as determined using the Regional Energy Deployment Systems (ReEDS) model. Four unique electricity sector pathways will be considered, including business-as-usual, carbon cap, high renewable energy technology costs, and coal reliance scenarios. The combination of climate-water and electricity sector pathway scenarios leads to 80 potential future cases resulting in different national and regional electricity infrastructure configurations. The vulnerability of these configurations in relation to climate change (including in-stream thermal pollution impacts and environmental regulations) is evaluated using the Thermoelectric Power and Thermal Pollution (TP2M) model, providing

  16. 78 FR 11633 - Application To Export Electric Energy; ConocoPhillips Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ...Phillips Company AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application. SUMMARY: ConocoPhillips Company (CoP) has applied to renew its authority to transmit electric... Delivery and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000 Independence Avenue SW...

  17. Between-day reliability of the trapezius muscle H-reflex and M-wave.

    PubMed

    Vangsgaard, Steffen; Hansen, Ernst A; Madeleine, Pascal

    2015-12-01

    The aim of this study was to investigate the between-day reliability of the trapezius muscle H-reflex and M-wave. Sixteen healthy subjects were studied on 2 consecutive days. Trapezius muscle H-reflexes were evoked by electrical stimulation of the C3/4 cervical nerves; M-waves were evoked by electrical stimulation of the accessory nerve. Relative reliability was estimated by intraclass correlation coefficients (ICC2,1 ). Absolute reliability was estimated by computing the standard error of measurement (SEM) and the smallest real difference (SRD). Bland-Altman plots were constructed to detect any systematic bias. Variables showed substantial to excellent relative reliability (ICC = 0.70-0.99). The relative SEM ranged from 1.4% to 34.8%; relative SRD ranged from 3.8% to 96.5%. No systematic bias was present in the data. The amplitude and latency of the trapezius muscle H-reflex and M-wave in healthy young subjects can be measured reliably across days. © 2015 Wiley Periodicals, Inc.

  18. Summary of EPA’s Review of Comments on the National Electric Energy Data System (NEEDS) v.5.15

    EPA Pesticide Factsheets

    This document summarizes EPA’s review of comments on inputs to the IPM, including the National Electric Energy Data System (NEEDS) database. and highlights common comment types and how EPA generally reviewed and acted on those comments.

  19. 77 FR 30517 - Electricity Subsector Cybersecurity Risk Management Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of publication. SUMMARY... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk...

  20. Added Value of Reliability to a Microgrid: Simulations of Three California Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marnay, Chris; Lai, Judy; Stadler, Michael

    The Distributed Energy Resources Customer Adoption Model is used to estimate the value an Oakland nursing home, a Riverside high school, and a Sunnyvale data center would need to put on higher electricity service reliability for them to adopt a Consortium for Electric Reliability Technology Solutions Microgrid (CM) based on economics alone. A fraction of each building's load is deemed critical based on its mission, and the added cost of CM capability to meet it added to on-site generation options. The three sites are analyzed with various resources available as microgrid components. Results show that the value placed on highermore » reliability often does not have to be significant for CM to appear attractive, about 25 $/kWcdota and up, but the carbon footprint consequences are mixed because storage is often used to shift cheaper off-peak electricity to use during afternoon hours in competition with the solar sources.« less

  1. Design of fuel cell powered data centers for sufficient reliability and availability

    NASA Astrophysics Data System (ADS)

    Ritchie, Alexa J.; Brouwer, Jacob

    2018-04-01

    It is challenging to design a sufficiently reliable fuel cell electrical system for use in data centers, which require 99.9999% uptime. Such a system could lower emissions and increase data center efficiency, but the reliability and availability of such a system must be analyzed and understood. Currently, extensive backup equipment is used to ensure electricity availability. The proposed design alternative uses multiple fuel cell systems each supporting a small number of servers to eliminate backup power equipment provided the fuel cell design has sufficient reliability and availability. Potential system designs are explored for the entire data center and for individual fuel cells. Reliability block diagram analysis of the fuel cell systems was accomplished to understand the reliability of the systems without repair or redundant technologies. From this analysis, it was apparent that redundant components would be necessary. A program was written in MATLAB to show that the desired system reliability could be achieved by a combination of parallel components, regardless of the number of additional components needed. Having shown that the desired reliability was achievable through some combination of components, a dynamic programming analysis was undertaken to assess the ideal allocation of parallel components.

  2. The all electric airplane-benefits and challenges

    NASA Technical Reports Server (NTRS)

    Spitzer, C. R.; Hood, R. V.

    1982-01-01

    The all electric aircraft considered in the present investigation is an aircraft which has digital flight crucial controls, electromechanical actuators, and electrical secondary power. There are no hydraulic or pneumatic systems. The characteristics of an all electric aircraft are related to reduced acquisition cost, reduced weight, reduced fuel consumption, increased reliability, reduced support equipment, simpler maintenance, an expanded flight envelope, and improved survivability. An additional benefit is the dramatically increased design flexibility and mission adaptability. However, the implementation of the all electric aircraft concept requires the resolution of a number of major technology issues. Issues in the digital flight controls area are related to achieving the required levels of safety and reliability in a cost effective manner. Other challenges which have to be met are concerned with electromechanical actuators, environmental control and ice protection systems, and engine technology.

  3. Transit Reliability Information Program (TRIP) Phase I Report

    DOT National Transportation Integrated Search

    1981-06-01

    The Transit Reliability Information Program (TRIP) is a government initiated program to assist the transit industry in satisfying its need for transit reliability information. TRIP provides this assistance through the operation of a national reliabil...

  4. Study of aircraft electrical power systems

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The formulation of a philosophy for devising a reliable, efficient, lightweight, and cost effective electrical power system for advanced, large transport aircraft in the 1980 to 1985 time period is discussed. The determination and recommendation for improvements in subsystems and components are also considered. All aspects of the aircraft electrical power system including generation, conversion, distribution, and utilization equipment were considered. Significant research and technology problem areas associated with the development of future power systems are identified. The design categories involved are: (1) safety-reliability, (2) power type, voltage, frequency, quality, and efficiency, (3) power control, and (4) selection of utilization equipment.

  5. 76 FR 67430 - Application To Export Electric Energy; Tenaska Power Services Co.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... Services Co. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Tenaska Power Services Co. (Tenaska) has applied to renew its authority to transmit... of Electricity Delivery and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000...

  6. Did Geomagnetic Activity Challenge Electric Power Reliability During Solar Cycle 23? Evidence from the PJM Regional Transmission Organization in North America

    NASA Technical Reports Server (NTRS)

    Forbes, Kevin F.; Cyr, Chris St

    2012-01-01

    During solar cycle 22, a very intense geomagnetic storm on 13 March 1989 contributed to the collapse of the Hydro-Quebec power system in Canada. This event clearly demonstrated that geomagnetic storms have the potential to lead to blackouts. This paper addresses whether geomagnetic activity challenged power system reliability during solar cycle 23. Operations by PJM Interconnection, LLC (hereafter PJM), a regional transmission organization in North America, are examined over the period 1 April 2002 through 30 April 2004. During this time PJM coordinated the movement of wholesale electricity in all or parts of Delaware, Maryland, New Jersey, Ohio, Pennsylvania, Virginia, West Virginia, and the District of Columbia in the United States. We examine the relationship between a proxy of geomagnetically induced currents (GICs) and a metric of challenged reliability. In this study, GICs are proxied using magnetometer data from a geomagnetic observatory located just outside the PJM control area. The metric of challenged reliability is the incidence of out-of-economic-merit order dispatching due to adverse reactive power conditions. The statistical methods employed make it possible to disentangle the effects of GICs on power system operations from purely terrestrial factors. The results of the analysis indicate that geomagnetic activity can significantly increase the likelihood that the system operator will dispatch generating units based on system stability considerations rather than economic merit.

  7. Intra-instrument reliability of 4 goniometers.

    PubMed

    Pringle, R Kevin

    2003-01-01

    Cervical spine ROM movements taken accurately with reliable measuring devices are important in outcome measures as well as in measuring disability. To compare the active cervical spine ROM in healthy young adult population using 4 different goniometers. Subjects were tested during active cervical spine ROM. The devices were a single hinge inclinometer, single bubble carpenter's inclinometer, dual bubble goniometers and Cybex EDI 320 electrical inclinometer. All subjects were tested for rotational limits along each of the orthogonal axes of movement. There are 3 trials for each movement direction, except rotation was not measured with the Cybex as per manual suggestions. The subjects were randomly assigned to the sequence of devices. Twenty-seven student volunteers (19 men and 8 women) were tested. Ages ranged from 21 to 41, mean age of 27.6 years of age. Active cervical spine ROM trials for each measurement was used to calculate mean and standard deviation. An overall analysis of variance (ANOVA) and Bonferroni adjusted T-test were determined in order to calculate reliability and significance. The cost of the instruments were not used in determining reliability or significance. The single hinge inclinometer was found to be a reliable measure but not likely valid. The Cybex EDI 320 was found to be the best measuring device; however, the 2 instruments whose cost were in-between the single hinge inclinometer and the electrical goniometer were just as reliable as the more expensive device. The AMA Guides of Impairment were used as the normative data to compare these devices. Since the devices could measure reliably, whether expensive or more cost effective for students they would likely make adequate devices for training students on the methods for measuring ROM. There is previous data to suggest that older populations have gender differences and age differences with ROM. This study could not measure that and would make a useful follow-up study.

  8. Interrater Reliability of the Power Mobility Road Test in the Virtual Reality-Based Simulator-2.

    PubMed

    Kamaraj, Deepan C; Dicianno, Brad E; Mahajan, Harshal P; Buhari, Alhaji M; Cooper, Rory A

    2016-07-01

    To assess interrater reliability of the Power Mobility Road Test (PMRT) when administered through the Virtual Reality-based SIMulator-version 2 (VRSIM-2). Within-subjects repeated-measures design. Participants interacted with VRSIM-2 through 2 display options (desktop monitor vs immersive virtual reality screens) using 2 control interfaces (roller system vs conventional movement-sensing joystick), providing 4 different driving scenarios (driving conditions 1-4). Participants performed 3 virtual driving sessions for each of the 2 display screens and 1 session through a real-world driving course (driving condition 5). The virtual PMRT was conducted in a simulated indoor office space, and an equivalent course was charted in an open space for the real-world assessment. After every change in driving condition, participants completed a self-reported workload assessment questionnaire, the Task Load Index, developed by the National Aeronautics and Space Administration. A convenience sample of electric-powered wheelchair (EPW) athletes (N=21) recruited at the 31st National Veterans Wheelchair Games. Not applicable. Total composite PMRT score. The PMRT had high interrater reliability (intraclass correlation coefficient [ICC]>.75) between the 2 raters in all 5 driving conditions. Post hoc analyses revealed that the reliability analyses had >80% power to detect high ICCs in driving conditions 1 and 4. The PMRT has high interrater reliability in conditions 1 and 4 and could be used to assess EPW driving performance virtually in VRSIM-2. However, further psychometric assessment is necessary to assess the feasibility of administering the PMRT using the different interfaces of VRSIM-2. Copyright © 2016 American Congress of Rehabilitation Medicine. Published by Elsevier Inc. All rights reserved.

  9. A Quantitative Assessment of Utility Reporting Practices for Reporting Electric Power Distribution Events

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamachi La Commare, Kristina

    Metrics for reliability, such as the frequency and duration of power interruptions, have been reported by electric utilities for many years. This study examines current utility practices for collecting and reporting electricity reliability information and discusses challenges that arise in assessing reliability because of differences among these practices. The study is based on reliability information for year 2006 reported by 123 utilities in 37 states representing over 60percent of total U.S. electricity sales. We quantify the effects that inconsistencies among current utility reporting practices have on comparisons of System Average Interruption Duration Index (SAIDI) and System Average Interruption Frequency Indexmore » (SAIFI) reported by utilities. We recommend immediate adoption of IEEE Std. 1366-2003 as a consistent method for measuring and reporting reliability statistics.« less

  10. Apples to Apples: Equivalent-Reliability Power Systems Across Diverse Resource Mix Scenarios

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stephen, Gordon W; Frew, Bethany A; Sigler, Devon

    Electricity market research is highly price sensitive, and prices are strongly influenced by balance of supply and demand. This work looks at how to combine capacity expansion models and reliability assessment tools to assess equivalent-reliability power systems across diverse resource mix scenarios.

  11. Compact, Reliable EEPROM Controller

    NASA Technical Reports Server (NTRS)

    Katz, Richard; Kleyner, Igor

    2010-01-01

    A compact, reliable controller for an electrically erasable, programmable read-only memory (EEPROM) has been developed specifically for a space-flight application. The design may be adaptable to other applications in which there are requirements for reliability in general and, in particular, for prevention of inadvertent writing of data in EEPROM cells. Inadvertent writes pose risks of loss of reliability in the original space-flight application and could pose such risks in other applications. Prior EEPROM controllers are large and complex and do not provide all reasonable protections (in many cases, few or no protections) against inadvertent writes. In contrast, the present controller provides several layers of protection against inadvertent writes. The controller also incorporates a write-time monitor, enabling determination of trends in the performance of an EEPROM through all phases of testing. The controller has been designed as an integral subsystem of a system that includes not only the controller and the controlled EEPROM aboard a spacecraft but also computers in a ground control station, relatively simple onboard support circuitry, and an onboard communication subsystem that utilizes the MIL-STD-1553B protocol. (MIL-STD-1553B is a military standard that encompasses a method of communication and electrical-interface requirements for digital electronic subsystems connected to a data bus. MIL-STD- 1553B is commonly used in defense and space applications.) The intent was to both maximize reliability while minimizing the size and complexity of onboard circuitry. In operation, control of the EEPROM is effected via the ground computers, the MIL-STD-1553B communication subsystem, and the onboard support circuitry, all of which, in combination, provide the multiple layers of protection against inadvertent writes. There is no controller software, unlike in many prior EEPROM controllers; software can be a major contributor to unreliability, particularly in fault

  12. Identification of advantageous electricity generation options in sub-Saharan Africa integrating existing resources

    NASA Astrophysics Data System (ADS)

    Szabó, Sándor; Moner-Girona, Magda; Kougias, Ioannis; Bailis, Rob; Bódis, Katalin

    2016-10-01

    Pioneering approaches are needed to accelerate universal access to electricity while simultaneously transitioning to reliable, sustainable and affordable energy systems. In sub-Saharan Africa (SSA), the challenges lie in attracting the private sector to complement public investments. Here, we present an integrated ‘low-hanging-fruit’ approach aimed at boosting private investment and speeding up the deployment of renewable energy systems in SSA. We analyse the potential of existing energy infrastructure, where a significant upfront investment has already been made, to be exploited for electricity generation. We develop a comprehensive methodology to identify and select suitable locations in SSA and estimate their potential for exploitation. These locations have been further analysed in terms of power capacity potential, electricity output, investments needed and population to be benefited. This strategy to attract additional finance can easily be reproduced, engaging private investors while simultaneously helping to achieve the United Nations (UN) Sustainable Development Goals on energy.

  13. A study on reliability of power customer in distribution network

    NASA Astrophysics Data System (ADS)

    Liu, Liyuan; Ouyang, Sen; Chen, Danling; Ma, Shaohua; Wang, Xin

    2017-05-01

    The existing power supply reliability index system is oriented to power system without considering actual electricity availability in customer side. In addition, it is unable to reflect outage or customer’s equipment shutdown caused by instantaneous interruption and power quality problem. This paper thus makes a systematic study on reliability of power customer. By comparing with power supply reliability, reliability of power customer is defined and extracted its evaluation requirements. An indexes system, consisting of seven customer indexes and two contrast indexes, are designed to describe reliability of power customer from continuity and availability. In order to comprehensively and quantitatively evaluate reliability of power customer in distribution networks, reliability evaluation method is proposed based on improved entropy method and the punishment weighting principle. Practical application has proved that reliability index system and evaluation method for power customer is reasonable and effective.

  14. Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test

    DOE Data Explorer

    Keller, Jonathan (ORCID:0000000177243885)

    2016-12-28

    The GRC uses a combined gearbox testing, modeling, and analysis approach disseminating data and results to the industry and facilitating improvement of gearbox reliability. This test data describes the tests of GRC gearbox 3 in the National Wind Technology Center dynamometer and documents any modifications to the original test plan. It serves as a guide to interpret the publicly released data sets with brief analyses to illustrate the data. TDMS viewer and Solidworks software required to view data files. The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) was established by the U.S. Department of Energy in 2006; its key goal is to understand the root causes of premature gearbox failures and improve their reliability.

  15. Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test

    DOE Data Explorer

    Keller, Jonathan; Robb, Wallen

    2016-05-12

    The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) was established by the U.S. Department of Energy in 2006; its key goal is to understand the root causes of premature gearbox failures and improve their reliability. The GRC uses a combined gearbox testing, modeling, and analysis approach disseminating data and results to the industry and facilitating improvement of gearbox reliability. This test data describes the tests of GRC gearbox 2 in the National Wind Technology Center dynamometer and documents any modifications to the original test plan. It serves as a guide to interpret the publicly released data sets with brief analyses to illustrate the data. TDMS viewer and Solidworks software required to view data files.

  16. 77 FR 53884 - Automatic Underfrequency Load Shedding and Load Shedding Plans Reliability Standards; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... Underfrequency Load Shedding and Load Shedding Plans Reliability Standards; Notice of Compliance Filing Take notice that on August 9, 2012, North American Electric Reliability Corporation submitted a compliance... Load Shedding Plans Reliability Standards, 139 FERC ] 61,098, (Order No. 763) (2012). Any person...

  17. 77 FR 13585 - Electricity Subsector Cybersecurity Risk Management Process Guideline

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process Guideline AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of public... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk...

  18. Stratum Electricity Markets: Toward Multi-temporal Distributed Risk Management for Sustainable Electricity Provision

    NASA Astrophysics Data System (ADS)

    Wu, Zhiyong (Richard)

    Motivated by the overall challenge of ensuring long-term sustainable electricity service, we view this challenge as a long-term decision making problem under uncertainties. We start by recognizing that, independent of the industry organization, the uncertainties are enormous and often exogenous to the energy service providers. They are multi-dimensional and are result of fundamental drivers, ranging from the supply side, through the demand side, to the regulatory and policy sides. The basic contribution of this thesis comes from the recognition that long-term investments for ensuring reliable and stable electricity service critically depend on how these uncertainties are perceived, valued and managed by the different stakeholders within the complex industry organization such as the electric power industry. We explain several reasons why price signals obtained from current short-term electricity markets alone are not sufficient enough for long-term sustainable provision. Some enhancements are presented in the thesis to improve the short-term electricity market price signals to reflect the true cost of operation. New market mechanisms and instruments are needed to facilitate the stakeholders to better deal with long-term risks. The problems of ensuring long-term stable reliable service in the sense of the traditional resource adequacy requirements are revisited in both the restructuring industry and regulated industry. We introduce a so-called Stratum Electricity Market (SEM) design as the basic market mechanism for solving the problem of long-term reliable electricity service through a series of interactive multi-lateral market exchange platforms for risks communication, management and evaluations over various time horizons and by the different groups of stakeholders. In other words, our proposed SEM is a basic IT-enabled framework for the decision making processes by various parties over different time. Because of the uniqueness of electricity as a commodity, the

  19. 76 FR 76153 - Allco Renewable Energy Limited v. Massachusetts Electric Company d/b/a National Grid; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-12-000] Allco Renewable Energy Limited v. Massachusetts Electric Company d/b/a National Grid; Notice of Complaint Take notice... Public Utilities Regulatory Policies Act (PURPA), Allco Renewable Energy Limited filed a formal complaint...

  20. FY2010 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olszewski, Mitchell

    The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and Chrysler) announced in January 2002 a new cooperative research effort. Known as FreedomCAR (derived from ''Freedom'' and ''Cooperative Automotive Research''), it represents DOE's commitment to developing public-private partnerships to fund high risk, high payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieve the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ranmore » from 1993 through 2001. The Oak Ridge National Laboratory's (ORNL's) Advanced Power Electronics and Electric Machines (APEEM) subprogram within the DOE Vehicle Technologies Program (VTP) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE) and electric motor technologies that will leapfrog current on-the-road technologies. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow's automobiles will function as a unified system to improve fuel efficiency. In supporting the development of advanced vehicle propulsion systems, the APEEM subprogram has enabled the development of technologies that will significantly improve efficiency, costs, and fuel economy. The APEEM subprogram supports the efforts of the FreedomCAR and Fuel Partnership through a three phase approach intended to: (1) identify overall propulsion and vehicle related needs by analyzing programmatic goals and reviewing industry's recommendations and requirements and then develop the appropriate technical targets for systems, subsystems, and component research and development

  1. Modeling water resources as a constraint in electricity capacity expansion models

    NASA Astrophysics Data System (ADS)

    Newmark, R. L.; Macknick, J.; Cohen, S.; Tidwell, V. C.; Woldeyesus, T.; Martinez, A.

    2013-12-01

    In the United States, the electric power sector is the largest withdrawer of freshwater in the nation. The primary demand for water from the electricity sector is for thermoelectric power plant cooling. Areas likely to see the largest near-term growth in population and energy usage, the Southwest and the Southeast, are also facing freshwater scarcity and have experienced water-related power reliability issues in the past decade. Lack of water may become a barrier for new conventionally-cooled power plants, and alternative cooling systems will impact technology cost and performance. Although water is integral to electricity generation, it has long been neglected as a constraint in future electricity system projections. Assessing the impact of water resource scarcity on energy infrastructure development is critical, both for conventional and renewable energy technologies. Efficiently utilizing all water types, including wastewater and brackish sources, or utilizing dry-cooling technologies, will be essential for transitioning to a low-carbon electricity system. This work provides the first demonstration of a national electric system capacity expansion model that incorporates water resources as a constraint on the current and future U.S. electricity system. The Regional Electricity Deployment System (ReEDS) model was enhanced to represent multiple cooling technology types and limited water resource availability in its optimization of electricity sector capacity expansion to 2050. The ReEDS model has high geographic and temporal resolution, making it a suitable model for incorporating water resources, which are inherently seasonal and watershed-specific. Cooling system technologies were assigned varying costs (capital, operations and maintenance), and performance parameters, reflecting inherent tradeoffs in water impacts and operating characteristics. Water rights supply curves were developed for each of the power balancing regions in ReEDS. Supply curves include costs

  2. Optical sensors for electrical elements of a medium voltage distribution network

    NASA Astrophysics Data System (ADS)

    De Maria, Letizia; Bartalesi, Daniele; Serragli, Paolo; Paladino, Domenico

    2012-04-01

    The aging of most of the components of the National transmission and distribution system can potentially influence the reliability of power supply in a Medium Voltage (MV) network. In order to prevent possible dangerous situations, selected diagnostic indicators on electrical parts exploiting reliable and potentially low-cost sensors are required. This paper presents results concerning two main research activities regarding the development and application of innovative optical sensors for the diagnostic of MV electrical components. The first concerns a multi-sensor prototype for the detection of pre-discharges in MV switchboards: it is the combination of three different types of sensors operating simultaneously to detect incipient failure and to reduce the occurrence of false alarms. The system is real-time controlled by an embedded computer through a LabView interface. The second activity refers to a diagnostic tool to provide significant real-time information about early aging of MV/Low Voltage (LV) transformers by means of its vibration fingerprint. A miniaturized Optical Micro-Electro-Mechanical System (MEMS) based unit has been assembled for vibration measurements, wireless connected to a remote computer and controlled via LabView interface. Preliminary comparative tests were carried out with standard piezoelectric accelerometers on a conventional MV/LV test transformer under open circuit and in short-circuited configuration.

  3. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING... interruption as it transitions from one method of funding to another. Any proposed transitional funding plan...

  4. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING... interruption as it transitions from one method of funding to another. Any proposed transitional funding plan...

  5. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING... interruption as it transitions from one method of funding to another. Any proposed transitional funding plan...

  6. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING... interruption as it transitions from one method of funding to another. Any proposed transitional funding plan...

  7. Electric bus systems.

    DOT National Transportation Integrated Search

    2017-04-01

    Pure electric buses (EBs) offer an alternative fuel for the nations transit bus systems. To : evaluate EBs in a transit setting, this project investigated the five electric bus fleet of the : StarMetro transit system of the city of Tallahassee, FL...

  8. Visual inspection reliability for precision manufactured parts

    DOE PAGES

    See, Judi E.

    2015-09-04

    Sandia National Laboratories conducted an experiment for the National Nuclear Security Administration to determine the reliability of visual inspection of precision manufactured parts used in nuclear weapons. In addition visual inspection has been extensively researched since the early 20th century; however, the reliability of visual inspection for nuclear weapons parts has not been addressed. In addition, the efficacy of using inspector confidence ratings to guide multiple inspections in an effort to improve overall performance accuracy is unknown. Further, the workload associated with inspection has not been documented, and newer measures of stress have not been applied.

  9. 78 FR 77574 - Protection System Maintenance Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    ... protection system component type, except that the maintenance program for all batteries associated with the... Electric System reliability and promoting efficiency through consolidation [of protection system-related... ITC that PRC-005-2 promotes efficiency by consolidating protection system maintenance requirements...

  10. Renewable Electricity Futures: Exploration of a U.S. Grid with 80% Renewable Electricity

    NASA Astrophysics Data System (ADS)

    Mai, Trieu

    2013-04-01

    Renewable Electricity Futures is an initial investigation of the extent to which renewable energy supply can meet the electricity demands of the contiguous United States over the next several decades. This study explores the implications and challenges of very high renewable electricity generation levels: from 30% up to 90% (focusing on 80%) of all U.S. electricity generation from renewable technologies in 2050. At such high levels of renewable electricity penetration, the unique characteristics of some renewable resources, specifically geographical distribution and variability and un-certainty in output, pose challenges to the operability of the nation's electric system. The study focuses on key technical implications of this environment from a national perspective, exploring whether the U.S. power system can supply electricity to meet customer demand on an hourly basis with high levels of renewable electricity, including variable wind and solar generation. The study also identifies some of the potential economic, environmental, and social implications of deploying and integrating high levels of renewable electricity in the U.S. The full report and associated supporting information is available at: http://www.nrel.gov/analysis/refutures/.

  11. Alternative Fuels Data Center: Electric Vehicle Charging Network Expands at

    Science.gov Websites

    National Parks Electric Vehicle Charging Network Expands at National Parks to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Charging Network Expands at National Parks on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Charging Network Expands at National

  12. Electricity Market Module - NEMS Documentation

    EIA Publications

    2017-01-01

    Documents the Electricity Market Module as it was used for the Annual Energy Outlook. The Electricity Market Module (EMM) is the electricity supply component of the National Energy Modeling System (NEMS). The EMM represents the generation, transmission, and pricing of electricity. It consists of four submodules: the Electricity Capacity Planning (ECP) Submodule, the Electricity Fuel Dispatch (EFD) Submodule, the Electricity Finance and Pricing (EFP) Submodule, and the Electricity Load and Demand (ELD) Submodule.

  13. Application of urban neighborhoods in understanding of local level electricity consumption patterns

    NASA Astrophysics Data System (ADS)

    Roy Chowdhury, P. K.; Bhaduri, B. L.

    2017-12-01

    Aggregated national or regional level electricity consumption data fail to capture the spatial variation in consumption, a function of location, climate, topography, and local economics. Spatial monitoring of electricity usage patterns helps to understand derivers of location specific consumption behavior and develop models to cater to the consumer needs, plan efficiency measures, identify settled areas lacking access, and allows for future planning through assessing requirements. Developed countries have started to deploy sensor systems such as smart meters to gather information on local level consumption patterns, but such infrastructure is virtually nonexistent in developing nations, resulting in serious dearth of reliable data for planners and policy makers. Remote sensing of artificial nighttime lights from human settlements have proven useful to study electricity consumptions from global to regional scales, however, local level studies remain scarce. Using the differences in spatial characteristics among different urban neighborhoods such as industrial, commercial and residential, observable through very high resolution day time satellite images (<0.5 meter), formal urban neighborhoods have been generated through texture analysis. In this study, we explore the applicability of these urban neighborhoods in understanding local level electricity consumption patterns through exploring possible correlations between the spatial characteristics of these neighborhoods, associated general economic activities, and corresponding VIIRS day-night band (DNB) nighttime lights observations, which we use as a proxy for electricity consumption in the absence of ground level consumption data. The overall trends observed through this analysis provides useful explanations helping in understanding of broad electricity consumption patterns in urban areas lacking ground level observations. This study thus highlights possible application of remote sensing data driven methods in

  14. 75 FR 22579 - Application To Export Electric Energy; Morgan Stanley Capital Group Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... Stanley Capital Group Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION...: Office of Electricity Delivery and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000.... Zabrocki, Morgan Stanley & Co. Incorporated, 2000 Westchester Ave., Purchase, NY 10577 and Daniel E. Frank...

  15. The use of beeswax as heating element in non-electric infant incubator.

    PubMed

    Fadhillah Nugraha, Putri; Putra, Nandy; Ariantara, Bambang; Amin, Muhammad

    2017-11-01

    Non-electric infant incubators are needed in remote areas that have no access to electricity to reduce infant mortality nationwide. In previous studies, non-electric infant incubators have been developed using phase change material of beeswax as the heating element. This study aims to improve the performance of beeswax non-electric infant incubator to obtain a more reliable and practical one. The design of the original beeswax cartridge in the form of copper boxes was modified into tubes of stainless steel. The geometry and location of the air holes were also modified. Wood that was previously used as the body material was replaced with polyurethane to reduce the weight of the incubator. The beeswax cartridges were heated using boiling water until the beeswax melted. For temperature measurement, five 0.5 mm k-type thermocouples were placed inside of the incubator according to the National Industrial Standard of SNI 16-4221. The beeswax cartridge arrangement was varied to obtain the best performance. The results showed that polyurethane provides infant incubator lighter and more practical to use. The new design of non-electric infant incubator was capable of providing a temperature of 32-36 °C for 2 h.

  16. Reliability and prevalence of physical performance examination assessing mobility and balance in older persons in the US: data from the Third National Health and Nutrition Examination Survey.

    PubMed

    Ostchega, Y; Harris, T B; Hirsch, R; Parsons, V L; Kington, R; Katzoff, M

    2000-09-01

    This report provides reliability and prevalence estimates by sex, age, and race/ethnicity of an observed physical performance examination (PPE) assessing mobility and balance. The Third National Health and Nutrition Examination Survey (NHANES III) 1988-1994. A cross-sectional nationally representative survey. All persons aged 60 and older (n = 5,403) who performed the PPE either in the mobile examination center (MEC) or in the home during NHANES III (conducted 1988-1994). The PPE included timed chair stand, full tandem stand, and timed 8-foot walk. Timed chair stand and 8-foot timed walk were reliable measurements (Intraclass Correlations > 0.5). Women were significantly slower (P < .001) than men for both timed chair stands and timed walk. Non-Hispanic white men and women did the maneuvers in significantly less time than non-Hispanic black men and women and Mexican Americans women (P < .001). Lower extremity functions measured by timed chair stand and walk are reliable. Women at every age group were more physically limited than men.

  17. Selenide isotope generator for the Galileo mission. Reliability program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less

  18. Model documentation: Electricity Market Module, Electricity Fuel Dispatch Submodule

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report documents the objectives, analytical approach and development of the National Energy Modeling System Electricity Fuel Dispatch Submodule (EFD), a submodule of the Electricity Market Module (EMM). The report catalogues and describes the model assumptions, computational methodology, parameter estimation techniques, model source code, and forecast results generated through the synthesis and scenario development based on these components.

  19. Evaluation of a proposal for reliable low-cost grid power with 100% wind, water, and solar.

    PubMed

    Clack, Christopher T M; Qvist, Staffan A; Apt, Jay; Bazilian, Morgan; Brandt, Adam R; Caldeira, Ken; Davis, Steven J; Diakov, Victor; Handschy, Mark A; Hines, Paul D H; Jaramillo, Paulina; Kammen, Daniel M; Long, Jane C S; Morgan, M Granger; Reed, Adam; Sivaram, Varun; Sweeney, James; Tynan, George R; Victor, David G; Weyant, John P; Whitacre, Jay F

    2017-06-27

    A number of analyses, meta-analyses, and assessments, including those performed by the Intergovernmental Panel on Climate Change, the National Oceanic and Atmospheric Administration, the National Renewable Energy Laboratory, and the International Energy Agency, have concluded that deployment of a diverse portfolio of clean energy technologies makes a transition to a low-carbon-emission energy system both more feasible and less costly than other pathways. In contrast, Jacobson et al. [Jacobson MZ, Delucchi MA, Cameron MA, Frew BA (2015) Proc Natl Acad Sci USA 112(49):15060-15065] argue that it is feasible to provide "low-cost solutions to the grid reliability problem with 100% penetration of WWS [wind, water and solar power] across all energy sectors in the continental United States between 2050 and 2055", with only electricity and hydrogen as energy carriers. In this paper, we evaluate that study and find significant shortcomings in the analysis. In particular, we point out that this work used invalid modeling tools, contained modeling errors, and made implausible and inadequately supported assumptions. Policy makers should treat with caution any visions of a rapid, reliable, and low-cost transition to entire energy systems that relies almost exclusively on wind, solar, and hydroelectric power.

  20. Evaluation of a proposal for reliable low-cost grid power with 100% wind, water, and solar

    PubMed Central

    Apt, Jay; Bazilian, Morgan; Diakov, Victor; Hines, Paul D. H.; Jaramillo, Paulina; Kammen, Daniel M.; Long, Jane C. S.; Morgan, M. Granger; Reed, Adam; Sivaram, Varun; Sweeney, James; Tynan, George R.; Victor, David G.; Weyant, John P.; Whitacre, Jay F.

    2017-01-01

    A number of analyses, meta-analyses, and assessments, including those performed by the Intergovernmental Panel on Climate Change, the National Oceanic and Atmospheric Administration, the National Renewable Energy Laboratory, and the International Energy Agency, have concluded that deployment of a diverse portfolio of clean energy technologies makes a transition to a low-carbon-emission energy system both more feasible and less costly than other pathways. In contrast, Jacobson et al. [Jacobson MZ, Delucchi MA, Cameron MA, Frew BA (2015) Proc Natl Acad Sci USA 112(49):15060–15065] argue that it is feasible to provide “low-cost solutions to the grid reliability problem with 100% penetration of WWS [wind, water and solar power] across all energy sectors in the continental United States between 2050 and 2055”, with only electricity and hydrogen as energy carriers. In this paper, we evaluate that study and find significant shortcomings in the analysis. In particular, we point out that this work used invalid modeling tools, contained modeling errors, and made implausible and inadequately supported assumptions. Policy makers should treat with caution any visions of a rapid, reliable, and low-cost transition to entire energy systems that relies almost exclusively on wind, solar, and hydroelectric power. PMID:28630353

  1. Reliability evaluation of microgrid considering incentive-based demand response

    NASA Astrophysics Data System (ADS)

    Huang, Ting-Cheng; Zhang, Yong-Jun

    2017-07-01

    Incentive-based demand response (IBDR) can guide customers to adjust their behaviour of electricity and curtail load actively. Meanwhile, distributed generation (DG) and energy storage system (ESS) can provide time for the implementation of IBDR. The paper focus on the reliability evaluation of microgrid considering IBDR. Firstly, the mechanism of IBDR and its impact on power supply reliability are analysed. Secondly, the IBDR dispatch model considering customer’s comprehensive assessment and the customer response model are developed. Thirdly, the reliability evaluation method considering IBDR based on Monte Carlo simulation is proposed. Finally, the validity of the above models and method is studied through numerical tests on modified RBTS Bus6 test system. Simulation results demonstrated that IBDR can improve the reliability of microgrid.

  2. Sustainable Federal Fleets: Deploying Electric Vehicles and Electric Vehicle Supply Equipment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for Sustainable Federal Fleets. To assist agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory's (NREL's) EVSE Tiger Teams.

  3. Precision measurement of electric organ discharge timing from freely moving weakly electric fish.

    PubMed

    Jun, James J; Longtin, André; Maler, Leonard

    2012-04-01

    Physiological measurements from an unrestrained, untethered, and freely moving animal permit analyses of neural states correlated to naturalistic behaviors of interest. Precise and reliable remote measurements remain technically challenging due to animal movement, which perturbs the relative geometries between the animal and sensors. Pulse-type electric fish generate a train of discrete and stereotyped electric organ discharges (EOD) to sense their surroundings actively, and rapid modulation of the discharge rate occurs while free swimming in Gymnotus sp. The modulation of EOD rates is a useful indicator of the fish's central state such as resting, alertness, and learning associated with exploration. However, the EOD pulse waveforms remotely observed at a pair of dipole electrodes continuously vary as the fish swims relative to the electrodes, which biases the judgment of the actual pulse timing. To measure the EOD pulse timing more accurately, reliably, and noninvasively from a free-swimming fish, we propose a novel method based on the principles of waveform reshaping and spatial averaging. Our method is implemented using envelope extraction and multichannel summation, which is more precise and reliable compared with other widely used threshold- or peak-based methods according to the tests performed under various source-detector geometries. Using the same method, we constructed a real-time electronic pulse detector performing an additional online pulse discrimination routine to enhance further the detection reliability. Our stand-alone pulse detector performed with high temporal precision (<10 μs) and reliability (error <1 per 10(6) pulses) and permits longer recording duration by storing only event time stamps (4 bytes/pulse).

  4. Electricity Transmission, Pipelines, and National Trails. An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuiper, James A; Krummel, John R; Hlava, Kevin J

    2014-03-25

    As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to studymore » routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines. Based on Platts electrical transmission line data, a total of 101 existing intersections with national trails on federal land were found, and 20 proposed intersections. Transmission lines and pipelines are proposed in Alaska; however there are no

  5. Optimal Wind Power Uncertainty Intervals for Electricity Market Operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Ying; Zhou, Zhi; Botterud, Audun

    It is important to select an appropriate uncertainty level of the wind power forecast for power system scheduling and electricity market operation. Traditional methods hedge against a predefined level of wind power uncertainty, such as a specific confidence interval or uncertainty set, which leaves the questions of how to best select the appropriate uncertainty levels. To bridge this gap, this paper proposes a model to optimize the forecast uncertainty intervals of wind power for power system scheduling problems, with the aim of achieving the best trade-off between economics and reliability. Then we reformulate and linearize the models into a mixedmore » integer linear programming (MILP) without strong assumptions on the shape of the probability distribution. In order to invest the impacts on cost, reliability, and prices in a electricity market, we apply the proposed model on a twosettlement electricity market based on a six-bus test system and on a power system representing the U.S. state of Illinois. The results show that the proposed method can not only help to balance the economics and reliability of the power system scheduling, but also help to stabilize the energy prices in electricity market operation.« less

  6. Durability and reliability of electric vehicle batteries under electric utility grid operations: Bidirectional charging impact analysis

    NASA Astrophysics Data System (ADS)

    Dubarry, Matthieu; Devie, Arnaud; McKenzie, Katherine

    2017-08-01

    Vehicle-to-grid and Grid-to-vehicle strategies are often cited as promising to mitigate the intermittency of renewable energy on electric power grids. However, their impact on the vehicle battery degradation has not been investigated in detail. The aim of this work is to understand the impact of bidirectional charging on commercial Li-ion cells used in electric vehicles today. Results show that additional cycling to discharge vehicle batteries to the power grid, even at constant power, is detrimental to cell performance. This additional use of the battery packs could shorten the lifetime for vehicle use to less than five years. By contrast, the impact of delaying the charge in order to reduce the impact on the power grid is found to be negligible at room temperature, but could be significant in warmer climates.

  7. Parts and Components Reliability Assessment: A Cost Effective Approach

    NASA Technical Reports Server (NTRS)

    Lee, Lydia

    2009-01-01

    System reliability assessment is a methodology which incorporates reliability analyses performed at parts and components level such as Reliability Prediction, Failure Modes and Effects Analysis (FMEA) and Fault Tree Analysis (FTA) to assess risks, perform design tradeoffs, and therefore, to ensure effective productivity and/or mission success. The system reliability is used to optimize the product design to accommodate today?s mandated budget, manpower, and schedule constraints. Stand ard based reliability assessment is an effective approach consisting of reliability predictions together with other reliability analyses for electronic, electrical, and electro-mechanical (EEE) complex parts and components of large systems based on failure rate estimates published by the United States (U.S.) military or commercial standards and handbooks. Many of these standards are globally accepted and recognized. The reliability assessment is especially useful during the initial stages when the system design is still in the development and hard failure data is not yet available or manufacturers are not contractually obliged by their customers to publish the reliability estimates/predictions for their parts and components. This paper presents a methodology to assess system reliability using parts and components reliability estimates to ensure effective productivity and/or mission success in an efficient manner, low cost, and tight schedule.

  8. 77 FR 39858 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ...'' as used in the NERC Glossary. \\25\\ Id. at 15. \\26\\ Id. at 16. 16. NERC also explains that, while the...: Through http://www.ferc.gov . Documents created electronically using word processing software should be...'s Glossary of Terms Used in Reliability Standards (NERC Glossary) developed by the North American...

  9. Identifying Electricity Capacity at Risk to Changes in Climate and Water Resources in the United States

    NASA Astrophysics Data System (ADS)

    Miara, A.; Macknick, J.; Vorosmarty, C. J.; Corsi, F.; Fekete, B. M.; Newmark, R. L.; Tidwell, V. C.; Cohen, S. M.

    2016-12-01

    Thermoelectric plants supply 85% of electricity generation in the United States. Under a warming climate, the performance of these power plants may be reduced, as thermoelectric generation is dependent upon cool ambient temperatures and sufficient water supplies at adequate temperatures. In this study, we assess the vulnerability and reliability of 1,100 operational power plants (2015) across the contiguous United States under a comprehensive set of climate scenarios (five Global Circulation Models each with four Representative Concentration Pathways). We model individual power plant capacities using the Thermoelectric Power and Thermal Pollution model (TP2M) coupled with the Water Balance Model (WBM) at a daily temporal resolution and 5x5 km spatial resolution. Together, these models calculate power plant capacity losses that account for geophysical constraints and river network dynamics. Potential losses at the single-plant level are put into a regional energy security context by assessing the collective system-level reliability at the North-American Electricity Reliability Corporation (NERC) regions. Results show that the thermoelectric sector at the national level has low vulnerability under the contemporary climate and that system-level reliability in terms of available thermoelectric resources relative to thermoelectric demand is sufficient. Under future climates scenarios, changes in water availability and warm ambient temperatures lead to constraints on operational capacity and increased vulnerability at individual power plant sites across all regions in the United States. However, there is a strong disparity in regional vulnerability trends and magnitudes that arise from each region's climate, hydrology and technology mix. Despite increases in vulnerabilities at the individual power plant level, regional energy systems may still be reliable (with no system failures) due to sufficient back-up reserve capacities.

  10. National Maglev initiative: California line electric utility power system requirements

    NASA Technical Reports Server (NTRS)

    Save, Phil

    1994-01-01

    The electrical utility power system requirements were determined for a Maglev line from San Diego to San Francisco and Sacramento with a maximum capacity of 12,000 passengers an hour in each direction at a speed of 300 miles per hour, or one train every 30 seconds in each direction. Basically the Maglev line requires one 50-MVA substation every 12.5 miles. The need for new power lines to serve these substations and their voltage levels are based not only on equipment loading criteria but also on limitations due to voltage flicker and harmonics created by the Maglev system. The resulting power system requirements and their costs depend mostly on the geographical area, urban or suburban with 'strong' power systems, or mountains and rural areas with 'weak' power systems. A reliability evaluation indicated that emergency power sources, such as a 10-MW battery at each substation, were not justified if sufficient redundancy is provided in the design of the substations and the power lines serving them. With a cost of $5.6 M per mile, the power system requirements, including the 12-kV DC cables and the inverters along the Maglev line, were found to be the second largest cost component of the Maglev system, after the cost of the guideway system ($9.1 M per mile), out of a total cost of $23 M per mile.

  11. Optimal Wind Energy Integration in Large-Scale Electric Grids

    NASA Astrophysics Data System (ADS)

    Albaijat, Mohammad H.

    The major concern in electric grid operation is operating under the most economical and reliable fashion to ensure affordability and continuity of electricity supply. This dissertation investigates the effects of such challenges, which affect electric grid reliability and economic operations. These challenges are: 1. Congestion of transmission lines, 2. Transmission lines expansion, 3. Large-scale wind energy integration, and 4. Phaser Measurement Units (PMUs) optimal placement for highest electric grid observability. Performing congestion analysis aids in evaluating the required increase of transmission line capacity in electric grids. However, it is necessary to evaluate expansion of transmission line capacity on methods to ensure optimal electric grid operation. Therefore, the expansion of transmission line capacity must enable grid operators to provide low-cost electricity while maintaining reliable operation of the electric grid. Because congestion affects the reliability of delivering power and increases its cost, the congestion analysis in electric grid networks is an important subject. Consequently, next-generation electric grids require novel methodologies for studying and managing congestion in electric grids. We suggest a novel method of long-term congestion management in large-scale electric grids. Owing to the complication and size of transmission line systems and the competitive nature of current grid operation, it is important for electric grid operators to determine how many transmission lines capacity to add. Traditional questions requiring answers are "Where" to add, "How much of transmission line capacity" to add, and "Which voltage level". Because of electric grid deregulation, transmission lines expansion is more complicated as it is now open to investors, whose main interest is to generate revenue, to build new transmission lines. Adding a new transmission capacity will help the system to relieve the transmission system congestion, create

  12. Measure of Truck Delay and Reliability at the Corridor Level

    DOT National Transportation Integrated Search

    2018-04-01

    Freight transportation provides a significant contribution to our nations economy. A reliable and accessible freight network enables business in the Twin Cities to be more competitive in the Upper Midwest region. Accurate and reliable freight data...

  13. Effect of knee angle on neuromuscular assessment of plantar flexor muscles: A reliability study

    PubMed Central

    Cornu, Christophe; Jubeau, Marc

    2018-01-01

    Introduction This study aimed to determine the intra- and inter-session reliability of neuromuscular assessment of plantar flexor (PF) muscles at three knee angles. Methods Twelve young adults were tested for three knee angles (90°, 30° and 0°) and at three time points separated by 1 hour (intra-session) and 7 days (inter-session). Electrical (H reflex, M wave) and mechanical (evoked and maximal voluntary torque, activation level) parameters were measured on the PF muscles. Intraclass correlation coefficients (ICC) and coefficients of variation were calculated to determine intra- and inter-session reliability. Results The mechanical measurements presented excellent (ICC>0.75) intra- and inter-session reliabilities regardless of the knee angle considered. The reliability of electrical measurements was better for the 90° knee angle compared to the 0° and 30° angles. Conclusions Changes in the knee angle may influence the reliability of neuromuscular assessments, which indicates the importance of considering the knee angle to collect consistent outcomes on the PF muscles. PMID:29596480

  14. Deploying Electric Vehicles and Electric Vehicle Supply Equipment: Tiger Teams Offer Project Assistance for Federal Fleets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    To assist federal agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory’s EVSE Tiger Teams.

  15. 78 FR 64207 - Application To Export Electric Energy; TEC Energy Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-28

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-388] Application To Export Electric Energy; TEC Energy Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application. SUMMARY: TEC Energy Inc. (TEC) has applied for authority to transmit electric energy from the United...

  16. 76 FR 3882 - Application To Export Electric Energy; Intercom Energy, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-21

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-289-B] Application To Export Electric Energy; Intercom Energy, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Intercom Energy, Inc. (Intercom) has applied to renew its authority to transmit electric...

  17. The Future of Electricity Resource Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kahrl, Fredrich; Mills, Andrew; Lavin, Luke

    Electricity resource planning is the process of identifying longer-term investments to meet electricity reliability requirements and public policy goals at a reasonable cost. Resource planning processes provide a forum for regulators, electric utilities, and electricity industry stakeholders to evaluate the economic, environmental, and social benefits and costs of different investment options. By facilitating a discussion on future goals, challenges and strategies, resource planning processes often play an important role in shaping utility business decisions. Resource planning emerged more than three decades ago in an era of transition, where declining electricity demand and rising costs spurred fundamental changes in electricity industrymore » regulation and structure. Despite significant changes in the industry, resource planning continues to play an important role in supporting investment decision making. Over the next two decades, the electricity industry will again undergo a period of transition, driven by technological change, shifting customer preferences and public policy goals. This transition will bring about a gradual paradigm shift in resource planning, requiring changes in scope, approaches and methods. Even as it changes, resource planning will continue to be a central feature of the electricity industry. Its functions — ensuring the reliability of high voltage (“bulk”) power systems, enabling oversight of regulated utilities and facilitating low-cost compliance with public policy goals — are likely to grow in importance as the electricity industry enters a new period of technological, economic and regulatory change. This report examines the future of electricity resource planning in the context of a changing electricity industry. The report examines emerging issues and evolving practices in five key areas that will shape the future of resource planning: (1) central-scale generation, (2) distributed generation, (3) demand-side resources, (4

  18. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... business plan and organization chart, explaining the proposed collection of all dues, fees and charges and... budget and business plan no later than sixty (60) days in advance of the beginning of the Electric... Organization may include in the application a plan for a transitional funding mechanism that would allow such...

  19. Rural Electric Youth Tour Packet.

    ERIC Educational Resources Information Center

    National Rural Electric Cooperative Association, Washington, DC.

    This packet of materials provides information about tours for rural secondary students in Washington, D.C., sponsored jointly by the National Rural Electric Cooperative Association (NRECA), state rural electric cooperatives, and statewide associations of rural electric systems. Since 1958 this program has selected high school students to visit…

  20. TOPEX electrical power system

    NASA Technical Reports Server (NTRS)

    Chetty, P. R. K.; Roufberg, Lew; Costogue, Ernest

    1991-01-01

    The TOPEX mission requirements which impact the power requirements and analyses are presented. A description of the electrical power system (EPS), including energy management and battery charging methods that were conceived and developed to meet the identified satellite requirements, is included. Analysis of the TOPEX EPS confirms that all of its electrical performance and reliability requirements have been met. The TOPEX EPS employs the flight-proven modular power system (MPS) which is part of the Multimission Modular Spacecraft and provides high reliability, abbreviated development effort and schedule, and low cost. An energy balance equation, unique to TOPEX, has been derived to confirm that the batteries will be completely recharged following each eclipse, under worst-case conditions. TOPEX uses three NASA Standard 50AH Ni-Cd batteries, each with 22 cells in series. The MPS contains battery charge control and protection based on measurements of battery currents, voltages, temperatures, and computed depth-of-discharge. In case of impending battery depletion, the MPS automatically implements load shedding.

  1. Electrical reliability, multilevel data storage and mechanical stability of MoS2-PMMA nanocomposite-based non-volatile memory device

    NASA Astrophysics Data System (ADS)

    Bhattacharjee, Snigdha; Sarkar, Pranab Kumar; Prajapat, Manoj; Roy, Asim

    2017-07-01

    Molybdenum disulfide (MoS2) is of great interest for its applicability in various optoelectronic devices. Here we report the resistive switching properties of polymethylmethacrylate embedding MoS2 nano-crystals. The devices are developed on an ITO-coated PET substrate with copper as the top electrode. Systematic evaluation of resistive switching parameters, on the basis of MoS2 content, suggests non-volatile memory characteristics. A decent ON/OFF ratio, high retention time and long endurance of 3  ×  103, 105 s and 105 cycles are respectively recorded in a device with 1 weight percent (wt%) of MoS2. The bending cyclic measurements confirm the flexibility of the memory devices with good electrical reliability as well as mechanical stability. In addition, multilevel storage has been demonstrated by controlling the current compliance and span of voltage sweeping in the memory device.

  2. Smart grid technologies in local electric grids

    NASA Astrophysics Data System (ADS)

    Lezhniuk, Petro D.; Pijarski, Paweł; Buslavets, Olga A.

    2017-08-01

    The research is devoted to the creation of favorable conditions for the integration of renewable sources of energy into electric grids, which were designed to be supplied from centralized generation at large electric power stations. Development of distributed generation in electric grids influences the conditions of their operation - conflict of interests arises. The possibility of optimal functioning of electric grids and renewable sources of energy, when complex criterion of the optimality is balance reliability of electric energy in local electric system and minimum losses of electric energy in it. Multilevel automated system for power flows control in electric grids by means of change of distributed generation of power is developed. Optimization of power flows is performed by local systems of automatic control of small hydropower stations and, if possible, solar power plants.

  3. 20--500 watt AMTEC auxiliary electric power system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ivanenok, J.F. III; Sievers, R.K.

    1996-12-31

    Numerous design studies have been completed on Alkali Metal Thermal to Electric Converter (AMTEC) power systems for space applications demonstrating their substantial increase in performance. Recently design studies have been initiated to couple AMTEC power conversion with fossil fueled combustion systems. This paper describes the results of a Phase 1 SBIR effort to design an innovative, efficient, reliable, long life AMTEC Auxiliary Electric Power System (AEPS) for remote site applications (20--500 watts). The concept uses high voltage AMTEC cells, each containing 7 to 9 small electrolyte tubes, integrated with a combustor and recuperator. These multi-tube AMTEC cells are low cost,more » reliable, long life static converters. AMTEC technology is ideal for auxiliary electric power supplies that must operate reliably over a broad range of temperatures, fuel sources, power levels, and operational specifications. The simplicity, efficiency (20% systems) and modularity of this technology allow it to fill applications as varied as light-weight backpacks, remote site power supplies, and military base power. Phase 1 demonstrated the feasibility of a 20% system design, and showed that the development needs to focus on identifying long life AMTEC cell components, determining the AMTEC cell and system reliability, and demonstrating that a 20 watt AMTEC system is 3--5 times more efficient than existing systems for the same application.« less

  4. Atoms to Electricity.

    ERIC Educational Resources Information Center

    Department of Energy, Washington, DC.

    This booklet explains the basic technology of nuclear fission power reactors, the nuclear fuel cycle, and the role of nuclear energy as one of the domestic energy resources being developed to meet the national energy demand. Major topic areas discussed include: the role of nuclear power; the role of electricity; generating electricity with the…

  5. Open-Ended Electric Motor

    ERIC Educational Resources Information Center

    Gould, Mauri

    1975-01-01

    Presents complete instructions for assembling an electric motor which does not require large amounts of power to operate and which is inexpensive as well as reliable. Several open-ended experiments with the motor are included as well as information for obtaining a kit of parts and instructions. (BR)

  6. Reliability Analysis of Differential Relay as Main Protection Transformer Using Fuzzy Logic Algorithm

    NASA Astrophysics Data System (ADS)

    Mulyadi, Y.; Sucita, T.; Sumarto; Alpani, M.

    2018-02-01

    Electricity supply demand is increasing every year. It makes PT. PLN (Persero) is required to provide optimal customer service and satisfaction. Optimal service depends on the performance of the equipment of the power system owned, especially the transformer. Power transformer is an electrical equipment that transforms electricity from high voltage to low voltage or vice versa. However, in the electrical power system, is inseparable from interference included in the transformer. But, the disturbance can be minimized by the protection system. The main protection transformer is differential relays. Differential relays working system using Kirchoff law where inflows equal outflows. If there are excessive currents that interfere then the relays will work. But, the relay can also experience decreased performance. Therefore, this final project aims to analyze the reliability of the differential relay on the transformer in three different substations. Referring to the standard applied by the transmission line protection officer, the differential relay shall have slope characteristics of 30% in the first slope and 80% in the second slope when using two slopes and 80% when using one slope with an instant time and the corresponding ratio. So, the results obtained on the Siemens differential release have a reliable slope characteristic with a value of 30 on the fuzzy logic system. In a while, ABB a differential relay is only 80% reliable because two experiments are not reliable. For the time, all the differential relays are instant with a value of 0.06 on the fuzzy logic system. For ratios, the differential relays ABB have a better value than others brand with a value of 151 on the fuzzy logic system.

  7. U.S. Electric System Operating Data

    EIA Publications

    EIA provides hourly electricity operating data, including actual and forecast demand, net generation, and the power flowing between electric systems. EIA's new U.S. Electric System Operating Data tool provides nearly real-time demand data, plus analysis and visualizations of hourly, daily, and weekly electricity supply and demand on a national and regional level for all of the 66 electric system balancing authorities that make up the U.S. electric grid.

  8. Reliability evaluation of CMOS RAMs

    NASA Astrophysics Data System (ADS)

    Salvo, C. J.; Sasaki, A. T.

    The results of an evaluation of the reliability of a 1K x 1 bit CMOS RAM and a 4K x 1 bit CMOS RAM for the USAF are reported. The tests consisted of temperature cycling, thermal shock, electrical overstress-static discharge and accelerated life test cells. The study indicates that the devices have high reliability potential for military applications. Use-temperature failure rates at 100 C were 0.54 x 10 to the -5th failures/hour for the 1K RAM and 0.21 x 10 to the -5th failures/hour for the 4K RAM. Only minimal electrostatic discharge damage was noted in the devices when they were subjected to multiple pulses at 1000 Vdc, and redesign of the 7 Vdc quiescent parameter of the 4K RAM is expected to raise its field threshold voltage.

  9. Results of a Demonstration Assessment of Passive System Reliability Utilizing the Reliability Method for Passive Systems (RMPS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bucknor, Matthew; Grabaskas, David; Brunett, Acacia

    2015-04-26

    Advanced small modular reactor designs include many advantageous design features such as passively driven safety systems that are arguably more reliable and cost effective relative to conventional active systems. Despite their attractiveness, a reliability assessment of passive systems can be difficult using conventional reliability methods due to the nature of passive systems. Simple deviations in boundary conditions can induce functional failures in a passive system, and intermediate or unexpected operating modes can also occur. As part of an ongoing project, Argonne National Laboratory is investigating various methodologies to address passive system reliability. The Reliability Method for Passive Systems (RMPS), amore » systematic approach for examining reliability, is one technique chosen for this analysis. This methodology is combined with the Risk-Informed Safety Margin Characterization (RISMC) approach to assess the reliability of a passive system and the impact of its associated uncertainties. For this demonstration problem, an integrated plant model of an advanced small modular pool-type sodium fast reactor with a passive reactor cavity cooling system is subjected to a station blackout using RELAP5-3D. This paper discusses important aspects of the reliability assessment, including deployment of the methodology, the uncertainty identification and quantification process, and identification of key risk metrics.« less

  10. Large wind turbines: A utility option for the generation of electricity

    NASA Technical Reports Server (NTRS)

    Robbins, W. H.; Thomas, R. L.; Baldwin, D. H.

    1980-01-01

    The wind resource is such that wind energy generation has the potential to save 6-7 quads of energy nationally. Thus, the Federal Government is sponsoring and encouraging the development of cost effective and reliable wind turbines. One element of the Federal Wind Energy Programs, Large Horizontal Axis Wind Turbine Development, is managed by the NASA Lewis Research Center for the Department of Energy. There are several ongoing wind system development projects oriented primarily toward utility application within this program element. In addition, a comprehensive technology program supporting the wind turbine development projects is being conducted. An overview is presented of the NASA activities with emphasis on application of large wind turbines for generation of electricity by utility systems.

  11. Electrical localization of weakly electric fish using neural networks

    NASA Astrophysics Data System (ADS)

    Kiar, Greg; Mamatjan, Yasin; Jun, James; Maler, Len; Adler, Andy

    2013-04-01

    Weakly Electric Fish (WEF) emit an Electric Organ Discharge (EOD), which travels through the surrounding water and enables WEF to locate nearby objects or to communicate between individuals. Previous tracking of WEF has been conducted using infrared (IR) cameras and subsequent image processing. The limitation of visual tracking is its relatively low frame-rate and lack of reliability when visually obstructed. Thus, there is a need for reliable monitoring of WEF location and behaviour. The objective of this study is to provide an alternative and non-invasive means of tracking WEF in real-time using neural networks (NN). This study was carried out in three stages. First stage was to recreate voltage distributions by simulating the WEF using EIDORS and finite element method (FEM) modelling. Second stage was to validate the model using phantom data acquired from an Electrical Impedance Tomography (EIT) based system, including a phantom fish and tank. In the third stage, the measurement data was acquired using a restrained WEF within a tank. We trained the NN based on the voltage distributions for different locations of the WEF. With networks trained on the acquired data, we tracked new locations of the WEF and observed the movement patterns. The results showed a strong correlation between expected and calculated values of WEF position in one dimension, yielding a high spatial resolution within 1 cm and 10 times higher temporal resolution than IR cameras. Thus, the developed approach could be used as a practical method to non-invasively monitor the WEF in real-time.

  12. Evaluating Proposed Investments in Power System Reliability and Resilience: Preliminary Results from Interviews with Public Utility Commission Staff

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaCommare, Kristina; Larsen, Peter; Eto, Joseph

    Policymakers and regulatory agencies are expressing renewed interest in the reliability and resilience of the U.S. electric power system in large part due to growing recognition of the challenges posed by climate change, extreme weather events, and other emerging threats. Unfortunately, there has been little or no consolidated information in the public domain describing how public utility/service commission (PUC) staff evaluate the economics of proposed investments in the resilience of the power system. Having more consolidated information would give policymakers a better understanding of how different state regulatory entities across the U.S. make economic decisions pertaining to reliability/resiliency. To helpmore » address this, Lawrence Berkeley National Laboratory (LBNL) was tasked by the U.S. Department of Energy Office of Energy Policy and Systems Analysis (EPSA) to conduct an initial set of interviews with PUC staff to learn more about how proposed utility investments in reliability/resilience are being evaluated from an economics perspective. LBNL conducted structured interviews in late May-early June 2016 with staff from the following PUCs: Washington D.C. (DCPSC), Florida (FPSC), and California (CPUC).« less

  13. 75 FR 38514 - Application to Export Electric Energy; Brookfield Energy Marketing LP

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... Energy Marketing LP AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Brookfield Energy Marketing LP (BEM LP) has applied for authority to transmit electric... surplus energy purchased from electric utilities, Federal power marketing agencies and other entities...

  14. 76 FR 11437 - Application To Export Electric Energy; Societe Generale Energy Corp.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-376] Application To Export Electric Energy; Societe Generale Energy Corp. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Societe Generale Energy Corp. (SGEC) has applied for authority to transmit electric...

  15. Electricity distribution industry restructuring, electrification, and competition in South Africa

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Galen, P S

    1997-07-01

    This paper reviews the status of the South African electricity supply industry (ESI) and proposals for reorienting and restructuring it. South Africa has been intensely examining its ESI for more than 4 years in an effort to determine whether and how it should be restructured to best support the country`s new economic development and social upliftment goals. The debate has been spirited and inclusive of most ESI stakeholders. The demands on and expectations for the ESI are many and varied. The debate has reflected this diversity of interests and views. In essence, however, there is a consensus on what ismore » expected of the industry, namely, to extend provision of adequate, reliable, and affordable electricity service to all citizens and segments of the economy. This means a large-scale electrification program to reach as many of the nearly 50% of households currently without electricity service as soon as possible, tariff reform to promote equity and efficiency, and the upgrading of service quality now being provided by some of the newly consolidated municipal authorities. The issues involved are how best to achieve these results within the context of the national Reconstruction and Development Program, while accounting for time and resource constraints and balancing the interests of the various parties.« less

  16. 75 FR 36385 - Reliability Standards Development and NERC and Regional Entity Enforcement Supplemental Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... Standards Development and NERC and Regional Entity Enforcement Supplemental Notice of Technical Conference... development and enforcement of mandatory Reliability Standards for the Bulk-Power System by the North American Electric Reliability Corporation and the Regional Entities. The conference will be held on Tuesday, July 6...

  17. Oak Ridge National Laboratory Annual Progress Report for the Electric Drive Technologies Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ozpineci, Burak

    The US Department of Energy (DOE) announced in May 2011 a new cooperative research effort comprising DOE, the US Council for Automotive Research (composed of automakers Ford Motor Company, General Motors Company, and Chrysler Group), Tesla Motors, and representatives of the electric utility and petroleum industries. Known as U.S. DRIVE (Driving Research and Innovation for Vehicle efficiency and Energy sustainability), it represents DOE’s commitment to developing public–private partnerships to fund high-risk–high-reward research into advanced automotive technologies. The new partnership replaces and builds upon the partnership known as FreedomCAR (derived from “Freedom” and “Cooperative Automotive Research”) that ran from 2002 throughmore » 2010 and the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. Oak Ridge National Laboratory’s (ORNL’s) Electric Drive Technologies (EDT) subprogram within the DOE Vehicle Technologies Office (VTO) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE), electric motor (EM), and traction drive system (TDS) technologies that will leapfrog current on-the-road technologies, leading to lower cost and better efficiency in transforming battery energy to useful work. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow’s automobiles will function as a unified system to improve fuel efficiency through research in more efficient TDSs. In supporting the development of advanced vehicle propulsion systems, the EDT subprogram fosters the development of technologies that will significantly improve efficiency, costs, and fuel economy« less

  18. 75 FR 75994 - Application To Export Electric Energy; NRG Power Marketing LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... Marketing LLC AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: NRG Power Marketing LLC (NRGPML) has applied to renew its authority to transmit electric... to Canada would be surplus energy purchased from electric utilities, Federal power marketing agencies...

  19. Northeastern Summer Electricity Market Alert

    EIA Publications

    2013-01-01

    The National Weather Service declared an excessive-heat warning for much of the Mid-Atlantic and northeastern United States, including major electric markets covering Philadelphia, Boston, Washington, D.C., and New York City. This report highlights the wholesale electricity market activity occurring in response to the higher-than-normal electricity demand caused by the heat wave.

  20. Pilot testing of SHRP 2 reliability data and analytical products: Washington.

    DOT National Transportation Integrated Search

    2014-07-30

    The second Strategic Highway Research Program (SHRP 2) addresses the challenges of moving people and goods efficiently and safely on the nations highways. In its Reliability focus area, the research emphasizes improving the reliability of highway ...

  1. Electrical safety during transplantation.

    PubMed

    Amicucci, G L; Di Lollo, L; Fiamingo, F; Mazzocchi, V; Platania, G; Ranieri, D; Razzano, R; Camin, G; Sebastiani, G; Gentile, P

    2010-01-01

    Technologic innovations enable management of medical equipment and power supply systems, with improvements that can affect the technical aspects, economics, and quality of medical service. Herein are outlined some technical guidelines, proposed by Istituto Superiore per la Prevenzione e la Sicurezza del Lavoro, for increasing the effectiveness of the power supply system and the safety of patients and surgeons in the operating room, with particular focus on transplantation. The dependence of diagnoses and therapies on operation of the electrical equipment can potentially cause great risk to patients. Moreover, it is possible that faulty electrical equipment could produce current that may flow through the patient. Because patients are particularly vulnerable when their natural protection is considerably decreased, as during transplantation or other surgery, power supply systems must operate with a high degree of reliability and quality to prevent risk, and must be designed to reduce hazards from direct and indirect contact. Reliability of the power supply system is closely related to the quality of the project, choice of materials, and management of the system (eg, quality and frequency of servicing). Among the proposed guidelines, other than normal referencing, are (1) adoption of a monitoring system to improve the quality of the electrical parameters in the operating room, (2) institution of emergency procedures for management of electrical faults, (3) a procedure for management of fires in the operating room, (4) and maintenance interventions and inspections of medical devices to maintain minimal requirements of safety and performance. Copyright 2010 Elsevier Inc. All rights reserved.

  2. Wind Turbine Drivetrain Reliability Collaborative Workshop: A Recap

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keller, Jonathan; Sheng, Shuangwen; Cotrell, Jason

    The Wind Turbine Drivetrain Reliability Collaborative Workshop was convened by the National Renewable Energy Laboratory (NREL), Argonne National Laboratory, and the U.S. Department of Energy to explore the state of the art in wind turbine drivetrain mechanical system reliability as well as research and development (R&D) challenges that if solved could have significant benefits. The workshop was held at the Research Support Facility on NREL's main campus in Golden, Colorado, from February 16-17, 2016. More than 120 attendees participated from industry, academia, and government. Plenary presentations covered wind turbine drivetrain design, testing, and analysis; tribology -- the science and engineeringmore » of interacting surfaces in relative motion -- and failure modes; and condition monitoring and data analytics. In addition to the presentations, workshops were held in each of these areas to discuss R&D challenges. This report serves as a summary of the presentations, workshops, and conclusions on R&D challenges in wind turbine drivetrain reliability.« less

  3. Electric vehicles

    NASA Astrophysics Data System (ADS)

    1990-03-01

    Quiet, clean, and efficient, electric vehicles (EVs) may someday become a practical mode of transportation for the general public. Electric vehicles can provide many advantages for the nation's environment and energy supply because they run on electricity, which can be produced from many sources of energy such as coal, natural gas, uranium, and hydropower. These vehicles offer fuel versatility to the transportation sector, which depends almost solely on oil for its energy needs. Electric vehicles are any mode of transportation operated by a motor that receives electricity from a battery or fuel cell. EVs come in all shapes and sizes and may be used for different tasks. Some EVs are small and simple, such as golf carts and electric wheel chairs. Others are larger and more complex, such as automobile and vans. Some EVs, such as fork lifts, are used in industries. In this fact sheet, we will discuss mostly automobiles and vans. There are also variations on electric vehicles, such as hybrid vehicles and solar-powered vehicles. Hybrid vehicles use electricity as their primary source of energy, however, they also use a backup source of energy, such as gasoline, methanol or ethanol. Solar-powered vehicles are electric vehicles that use photovoltaic cells (cells that convert solar energy to electricity) rather than utility-supplied electricity to recharge the batteries. These concepts are discussed.

  4. Wind turbine reliability database update.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, Valerie A.; Hill, Roger Ray; Stinebaugh, Jennifer A.

    2009-03-01

    This report documents the status of the Sandia National Laboratories' Wind Plant Reliability Database. Included in this report are updates on the form and contents of the Database, which stems from a fivestep process of data partnerships, data definition and transfer, data formatting and normalization, analysis, and reporting. Selected observations are also reported.

  5. Assessment of the reliability of data collected for the Department of Veterans Affairs national surgical quality improvement program.

    PubMed

    Davis, Chester L; Pierce, John R; Henderson, William; Spencer, C David; Tyler, Christine; Langberg, Robert; Swafford, Jennan; Felan, Gladys S; Kearns, Martha A; Booker, Brigitte

    2007-04-01

    The Office of the Medical Inspector of the Department of Veterans Affairs (VA) studied the reliability of data collected by the VA's National Surgical Quality Improvement Program (NSQIP). The study focused on case selection bias, accuracy of reports on patients who died, and interrater reliability measurements of patient risk variables and outcomes. Surgical data from a sample of 15 VA medical centers were analyzed. For case selection bias, reviewers applied NSQIP criteria to include or exclude 2,460 patients from the database, comparing their results with those of NSQIP staff. For accurate reporting of patients who died, reviewers compared Social Security numbers of 10,444 NSQIP records with those found in the VA Beneficiary Identification and Records Locator Subsystem, VA Patient Treatment Files, and Social Security Administration death files. For measurement of interrater reliability, reviewers reabstracted 59 variables in each of 550 patient medical records that also were recorded in the NSQIP database. On case selection bias, the reviewers agreed with NSQIP decisions on 2,418 (98%) of the 2,460 cases. Computer record matching identified 4 more deaths than the NSQIP total of 198, a difference of about 2%. For 52 of the categorical variables, agreement, uncorrected for chance, was 96%. For 48 of 52 categorical variables, kappas ranged from 0.61 to 1.0 (substantial to almost perfect agreement); none of the variables had kappas of less than 0.20 (slight to poor agreement). This sample of medical centers shows adherence to criteria in selecting cases for the NSQIP database, for reporting deaths, and for collecting patient risk variables.

  6. 77 FR 11515 - Application To Export Electric Energy; Pilot Power Group, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... reliability of the U.S. electric power supply system. Copies of this application will be made available, upon... DEPARTMENT OF ENERGY [OE Docket No. EA-383] Application To Export Electric Energy; Pilot Power... application. SUMMARY: Pilot Power Group, Inc. (Pilot Power) has applied for authority to transmit electric...

  7. 77 FR 50486 - Application To Export Electric Energy; TexMex Energy, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-294-B] Application To Export Electric Energy; TexMex Energy, LLC AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: TexMex Energy, LLC (TexMex) has applied to renew its authority to transmit electric energy from...

  8. Demonstration of Essential Reliability Services by a 300-MW Solar Photovoltaic Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loutan, Clyde; Klauer, Peter; Chowdhury, Sirajul

    The California Independent System Operator (CAISO), First Solar, and the National Renewable Energy Laboratory (NREL) conducted a demonstration project on a large utility-scale photovoltaic (PV) power plant in California to test its ability to provide essential ancillary services to the electric grid. With increasing shares of solar- and wind-generated energy on the electric grid, traditional generation resources equipped with automatic governor control (AGC) and automatic voltage regulation controls -- specifically, fossil thermal -- are being displaced. The deployment of utility-scale, grid-friendly PV power plants that incorporate advanced capabilities to support grid stability and reliability is essential for the large-scale integrationmore » of PV generation into the electric power grid, among other technical requirements. A typical PV power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. In this way, PV power plants can be used to mitigate the impact of variability on the grid, a role typically reserved for conventional generators. In August 2016, testing was completed on First Solar's 300-MW PV power plant, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to use grid-friendly controls to provide essential reliability services. These data showed how the development of advanced power controls can enable PV to become a provider of a wide range of grid services, including spinning reserves, load following, voltage support, ramping, frequency response, variability smoothing, and frequency regulation to power quality. Specifically, the tests conducted included various forms of active power control such as AGC and frequency regulation; droop response; and reactive power, voltage, and power factor controls. This project demonstrated that advanced power electronics and solar generation can be controlled

  9. Method and algorithm of ranking boiler plants at block electric power stations by the criterion of operation reliability and profitability

    NASA Astrophysics Data System (ADS)

    Farhadzadeh, E. M.; Muradaliyev, A. Z.; Farzaliyev, Y. Z.

    2015-10-01

    A method and an algorithm of ranking of boiler installations based on their technical and economic indicators are proposed. One of the basic conditions for ranking is the independence of technical and economic indicators. The assessment of their interrelation was carried out with respect to the correlation rate. The analysis of calculation data has shown that the interrelation stability with respect to the value and sign persists only for those indicators that have an evident relationship between each other. One of the calculation steps is the normalization of quantitative estimates of technical and economic indicators, which makes it possible to eliminate differences in dimensions and indicator units. The analysis of the known methods of normalization has allowed one to recommend the relative deviation from the average value as a normalized value and to use the arithmetic mean of the normalized values of independent indicators of each boiler installation as an integrated index of performance reliability and profitability. The fundamental differences from the existing approach to assess the "weak components" of a boiler installation and the quality of monitoring of its operating regimes are that the given approach takes into account the reliability and profitability of the operation of all other analogous boiler installations of an electric power station; it also implements competing elements with respect to the quality of control among the operating personnel of separate boiler installations and is aimed at encouraging an increased quality of maintenance and repairs.

  10. 33 CFR 127.107 - Electrical power systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Electrical power systems. 127.107... Waterfront Facilities Handling Liquefied Natural Gas § 127.107 Electrical power systems. (a) The electrical... source does not affect the capability of the other source. The system must meet the National Electrical...

  11. 33 CFR 127.107 - Electrical power systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Electrical power systems. 127.107... Waterfront Facilities Handling Liquefied Natural Gas § 127.107 Electrical power systems. (a) The electrical... source does not affect the capability of the other source. The system must meet the National Electrical...

  12. 33 CFR 127.107 - Electrical power systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Electrical power systems. 127.107... Waterfront Facilities Handling Liquefied Natural Gas § 127.107 Electrical power systems. (a) The electrical... source does not affect the capability of the other source. The system must meet the National Electrical...

  13. 33 CFR 127.107 - Electrical power systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Electrical power systems. 127.107... Waterfront Facilities Handling Liquefied Natural Gas § 127.107 Electrical power systems. (a) The electrical... source does not affect the capability of the other source. The system must meet the National Electrical...

  14. 33 CFR 127.107 - Electrical power systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Electrical power systems. 127.107... Waterfront Facilities Handling Liquefied Natural Gas § 127.107 Electrical power systems. (a) The electrical... source does not affect the capability of the other source. The system must meet the National Electrical...

  15. Power processing for electric propulsion

    NASA Technical Reports Server (NTRS)

    Finke, R. C.; Herron, B. G.; Gant, G. D.

    1975-01-01

    The potential of achieving up to 30 per cent more spacecraft payload or 50 per cent more useful operating life by the use of electric propulsion in place of conventional cold gas or hydrazine systems in science, communications, and earth applications spacecraft is a compelling reason to consider the inclusion of electric thruster systems in new spacecraft design. The propulsion requirements of such spacecraft dictate a wide range of thruster power levels and operational lifetimes, which must be matched by lightweight, efficient, and reliable thruster power processing systems. This paper will present electron bombardment ion thruster requirements; review the performance characteristics of present power processing systems; discuss design philosophies and alternatives in areas such as inverter type, arc protection, and control methods; and project future performance potentials for meeting goals in the areas of power processor weight (10 kg/kW), efficiency (approaching 92 per cent), reliability (0.96 for 15,000 hr), and thermal control capability (0.3 to 5 AU).

  16. Reliability Issues in Stirling Radioisotope Power Systems

    NASA Technical Reports Server (NTRS)

    Schreiber, Jeffrey; Shah, Ashwin

    2005-01-01

    Stirling power conversion is a potential candidate for use in a Radioisotope Power System (RPS) for space science missions because it offers a multifold increase in the conversion efficiency of heat to electric power and reduced requirement of radioactive material. Reliability of an RPS that utilizes Stirling power conversion technology is important in order to ascertain long term successful performance. Owing to long life time requirement (14 years), it is difficult to perform long-term tests that encompass all the uncertainties involved in the design variables of components and subsystems comprising the RPS. The requirement for uninterrupted performance reliability and related issues are discussed, and some of the critical areas of concern are identified. An overview of the current on-going efforts to understand component life, design variables at the component and system levels, and related sources and nature of uncertainties are also discussed. Current status of the 110 watt Stirling Radioisotope Generator (SRG110) reliability efforts is described. Additionally, an approach showing the use of past experience on other successfully used power systems to develop a reliability plan for the SRG110 design is outlined.

  17. Reliability Issues in Stirling Radioisotope Power Systems

    NASA Technical Reports Server (NTRS)

    Shah, Ashwin R.; Schreiber, Jeffrey G.

    2004-01-01

    Stirling power conversion is a potential candidate for use in a Radioisotope Power System (RPS) for space science missions because it offers a multifold increase in the conversion efficiency of heat to electric power and reduced requirement of radioactive material. Reliability of an RPS that utilizes Stirling power conversion technology is important in order to ascertain long term successful performance. Owing to long life time requirement (14 years), it is difficult to perform long-term tests that encompass all the uncertainties involved in the design variables of components and subsystems comprising the RPS. The requirement for uninterrupted performance reliability and related issues are discussed, and some of the critical areas of concern are identified. An overview of the current on-going efforts to understand component life, design variables at the component and system levels, and related sources and nature of uncertainties are also discussed. Current status of the 110 watt Stirling Radioisotope Generator (SRG110) reliability efforts is described. Additionally, an approach showing the use of past experience on other successfully used power systems to develop a reliability plan for the SRG110 design is outlined.

  18. Geomagnetic storms: Potential economic impacts on electric utilities

    NASA Astrophysics Data System (ADS)

    Barnes, P. R.; Vandyke, J. W.

    1991-03-01

    Geomagnetic storms associated with sunspot and solar flare activity can disturb communications and disrupt electric power. A very severe geomagnetic storm could cause a major blackout with an economic impact of several billion dollars. The vulnerability of electric power systems in the northeast United States will likely increase during the 1990s because of the trend of transmitting large amounts of power over long distance to meet the electricity demands of this region. A comprehensive research program and a warning satellite to monitor the solar wind are needed to enhance the reliability of electric power systems under the influence of geomagnetic storms.

  19. Trial application of reliability technology to emergency diesel generators at the Trojan Nuclear Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wong, S.M.; Boccio, J.L.; Karimian, S.

    1986-01-01

    In this paper, a trial application of reliability technology to the emergency diesel generator system at the Trojan Nuclear Power Plant is presented. An approach for formulating a reliability program plan for this system is being developed. The trial application has shown that a reliability program process, using risk- and reliability-based techniques, can be interwoven into current plant operational activities to help in controlling, analyzing, and predicting faults that can challenge safety systems. With the cooperation of the utility, Portland General Electric Co., this reliability program can eventually be implemented at Trojan to track its effectiveness.

  20. Electrical power technology for robotic planetary rovers

    NASA Technical Reports Server (NTRS)

    Bankston, C. P.; Shirbacheh, M.; Bents, D. J.; Bozek, J. M.

    1993-01-01

    Power technologies which will enable a range of robotic rover vehicle missions by the end of the 1990s and beyond are discussed. The electrical power system is the most critical system for reliability and life, since all other on board functions (mobility, navigation, command and data, communications, and the scientific payload instruments) require electrical power. The following are discussed: power generation, energy storage, power management and distribution, and thermal management.

  1. 76 FR 50476 - Application To Export Electric Energy; Glacial Energy of Texas, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-382] Application To Export Electric Energy; Glacial Energy of Texas, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application. SUMMARY: Glacial Energy of Texas, Inc. (Glacial) has applied for authority to transmit electric...

  2. 75 FR 52528 - Mandatory Reliability Standards for the Bulk-Power System; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... Frequency Response in the Wholesale Electric Grid on Thursday, September 23, from 10 a.m. to approximately 4... Order No. 693 the Commission approved Reliability Standard BAL-003-0 as mandatory and enforceable and directed the ERO to develop a modification to BAL-003-0 through the Reliability Standards development...

  3. Wavelet-based information filtering for fault diagnosis of electric drive systems in electric ships.

    PubMed

    Silva, Andre A; Gupta, Shalabh; Bazzi, Ali M; Ulatowski, Arthur

    2017-09-22

    Electric machines and drives have enjoyed extensive applications in the field of electric vehicles (e.g., electric ships, boats, cars, and underwater vessels) due to their ease of scalability and wide range of operating conditions. This stems from their ability to generate the desired torque and power levels for propulsion under various external load conditions. However, as with the most electrical systems, the electric drives are prone to component failures that can degrade their performance, reduce the efficiency, and require expensive maintenance. Therefore, for safe and reliable operation of electric vehicles, there is a need for automated early diagnostics of critical failures such as broken rotor bars and electrical phase failures. In this regard, this paper presents a fault diagnosis methodology for electric drives in electric ships. This methodology utilizes the two-dimensional, i.e. scale-shift, wavelet transform of the sensor data to filter optimal information-rich regions which can enhance the diagnosis accuracy as well as reduce the computational complexity of the classifier. The methodology was tested on sensor data generated from an experimentally validated simulation model of electric drives under various cruising speed conditions. The results in comparison with other existing techniques show a high correct classification rate with low false alarm and miss detection rates. Copyright © 2017 ISA. Published by Elsevier Ltd. All rights reserved.

  4. NASA Puffin Electric Tailsitter VTOL Concept

    NASA Technical Reports Server (NTRS)

    Moore, Mark D.

    2010-01-01

    Electric propulsion offers dramatic new vehicle mission capabilities, not possible with turbine or reciprocating engines; including high reliability and efficiency, low engine weight and maintenance, low cooling drag and volume required, very low noise and vibration, and zero emissions. The only penalizing characteristic of electric propulsion is the current energy storage technology level, which is set to triple over the next 5-10 years through huge new investments in this field. Most importantly, electric propulsion offers incredible new degrees of freedom in aircraft system integration to achieve unprecedented levels of aerodynamic, propulsive, control, and structural synergistic coupling. A unique characteristic of electric propulsion is that the technology is nearly scale-free, permitting small motors to be parallelized for fail-safe redundancy, or distributed across the airframe for tightly coupled interdisciplinary functionality without significant impacts in motor-controller efficiency or specific weight. Maximizing the potential benefit of electric propulsion is dependent on applying this technology to synergistic mission concepts. The vehicle missions with the most benefit include those which constrain environmental impact (or limit noise, exhaust, or emission signatures) are short range, or where large differences exist in the propulsion system sizing between takeoff and cruise conditions. Electric propulsion offers the following unique capabilities that other propulsion systems can t provide for short range Vertical Takeoff and Landing (VTOL) aircraft; elimination of engine noise and emissions, drastic reduction in engine cooling and radiated heat, drastic reduction in vehicle vibration levels, drastic improvement in reliability and operating costs, variable speed output at full power, for improved cruise efficiency at low tip-speed, elimination of high/hot sizing penalty, and reduction of engine-out penalties.

  5. 76 FR 16691 - Western Electric Coordinating Council Qualified Transfer Path Unscheduled Flow Relief Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... of the Western Electricity Coordinating Council (WECC) IRO-006-WECC-1 (Qualified Transfer Path... the Western Electricity Coordinating Council (WECC) IRO-006-WECC-1 (Qualified Transfer Path...: Balancing Authorities and Reliability Coordinator in the Western Electricity Coordinating Council. Frequency...

  6. Reliability Analysis of the Space Station Freedom Electrical Power System

    DTIC Science & Technology

    1989-08-01

    Cleveland, Ohio, who assisted in obtaining related research materials and provided feedback on our efforts to produce a dynamic analysis tool useful to...System software that we used to do our analysis of the electrical power system. Thanks are due to Dr. Vira Chankong, my thesis advisor, for his...a frequency duration analysis . Using a transition rate matrix with a model of the photovoltaic and solar dynamic systems, they have one model that

  7. Long-term Mechanical Circulatory Support System reliability recommendation by the National Clinical Trial Initiative subcommittee.

    PubMed

    Lee, James

    2009-01-01

    The Long-Term Mechanical Circulatory Support (MCS) System Reliability Recommendation was published in the American Society for Artificial Internal Organs (ASAIO) Journal and the Annals of Thoracic Surgery in 1998. At that time, it was stated that the document would be periodically reviewed to assess its timeliness and appropriateness within 5 years. Given the wealth of clinical experience in MCS systems, a new recommendation has been drafted by consensus of a group of representatives from the medical community, academia, industry, and government. The new recommendation describes a reliability test methodology and provides detailed reliability recommendations. In addition, the new recommendation provides additional information and clinical data in appendices that are intended to assist the reliability test engineer in the development of a reliability test that is expected to give improved predictions of clinical reliability compared with past test methods. The appendices are available for download at the ASAIO journal web site at www.asaiojournal.com.

  8. Integrating plug-in electric vehicles into the electric power system

    NASA Astrophysics Data System (ADS)

    Wu, Di

    This dissertation contributes to our understanding of how plug-in hybrid electric vehicles (PHEVs) and plug-in battery-only electric vehicles (EVs)---collectively termed plug-in electric vehicles (PEVs)---could be successfully integrated with the electric power system. The research addresses issues at a diverse range of levels pertaining to light-duty vehicles, which account for the majority of highway vehicle miles traveled, energy consumed by highway travel modes, and carbon dioxide emissions from on-road sources. Specifically, the following topics are investigated: (i) On-board power electronics topologies for bidirectional vehicle-to-grid and grid-to-vehicle power transfer; (ii) The estimation of the electric energy and power consumption by fleets of light-duty PEVs; (iii) An operating framework for the scheduling and dispatch of electric power by PEV aggregators; (iv) The pricing of electricity by PHEV aggregators and how it affects the decision-making process of a cost-conscious PHEV owner; (v) The impacts on distribution systems from PEVs under aggregator control; (vi) The modeling of light-duty PEVs for long-term energy and transportation planning at a national scale.

  9. Specifications and Standards for the Electric Warship

    DTIC Science & Technology

    2013-04-01

    number of professional societies issue standards documents. For the electric warship, IEEE, IEC, NEMA , ASTM, SAE and API are likely to be the sources...consideration should be given to referencing National Electrical Manufacturers Association ( NEMA ) specifications such as NEMA 250 Enclosures for Electrical

  10. 75 FR 57911 - Application to Export Electric Energy; EDF Trading North America, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... the proposed action will not adversely impact on the reliability of the U.S. electric power supply... from electric utilities, Federal power marketing agencies and other entities within the United States... DEPARTMENT OF ENERGY [OE Docket No. EA-373] Application to Export Electric Energy; EDF Trading...

  11. Impact of Distributed Energy Resources on the Reliability of a Critical Telecommunications Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson, D.; Atcitty, C.; Zuffranieri, J.

    2006-03-01

    Telecommunications has been identified by the Department of Homeland Security as a critical infrastructure to the United States. Failures in the power systems supporting major telecommunications service nodes are a main contributor to major telecommunications outages, as documented by analyses of Federal Communications Commission (FCC) outage reports by the National Reliability Steering Committee (under auspices of the Alliance for Telecommunications Industry Solutions). There are two major issues that are having increasing impact on the sensitivity of the power distribution to telecommunication facilities: deregulation of the power industry, and changing weather patterns. A logical approach to improve the robustness of telecommunicationmore » facilities would be to increase the depth and breadth of technologies available to restore power in the face of power outages. Distributed energy resources such as fuel cells and gas turbines could provide one more onsite electric power source to provide backup power, if batteries and diesel generators fail. But does the diversity in power sources actually increase the reliability of offered power to the office equipment, or does the complexity of installing and managing the extended power system induce more potential faults and higher failure rates? This report analyzes a system involving a telecommunications facility consisting of two switch-bays and a satellite reception system.« less

  12. Direct drive options for electric propulsion systems

    NASA Technical Reports Server (NTRS)

    Hamley, John A.

    1995-01-01

    Power processing units (PPU's) in an electric propulsion system provide many challenging integration issues. The PPU must provide power to the electric thruster while maintaining compatibility with all of the spacecraft power and data systems. Inefficiencies in the power processor produce heat, which must be radiated to the environment in order to ensure reliable operation. Although PPU efficiencies are generally greater than 0.9, heat loads are often substantial. This heat must be rejected by thermal control systems which generally have specific masses of 15-30 kg/kW. PPU's also represent a large fraction of the electric propulsion system dry mass. Simplification or elimination of power processing in a propulsion system would reduce the electric propulsion system specific mass and improve the overall reliability and performance. A direct drive system would eliminate all or some of the power supplies required to operate a thruster by directly connecting the various thruster loads to the solar array. The development of concentrator solar arrays has enabled power bus voltages in excess of 300 V which is high enough for direct drive applications for Hall thrusters such as the Stationary Plasma Thruster (SPT). The option of solar array direct drive for SPT's is explored to provide a comparison between conventional and direct drive system mass.

  13. Electrical device fabrication from nanotube formations

    DOEpatents

    Nicholas, Nolan Walker; Kittrell, W. Carter; Kim, Myung Jong; Schmidt, Howard K.

    2013-03-12

    A method for forming nanotube electrical devices, arrays of nanotube electrical devices, and device structures and arrays of device structures formed by the methods. Various methods of the present invention allow creation of semiconducting and/or conducting devices from readily grown SWNT carpets rather than requiring the preparation of a patterned growth channel and takes advantage of the self-controlling nature of these carpet heights to ensure a known and controlled channel length for reliable electronic properties as compared to the prior methods.

  14. Experimental study of camel powered electricity generation unit

    NASA Astrophysics Data System (ADS)

    Jakhar, O. P.; Choudhary, Rahul Raj; Budaniya, Mukesh; Kumar, Ashish

    2018-05-01

    Developing nations are facing a huge gap in generation and demand of electricity across the world. In present scenario the demand of electricity is increasing day by day and the shortfall of electricity has become one of the major obstructions in the development of rural areas. There is a big gap between electricity supply and demand. In India it is very difficult that to give twenty four hours electric supply in rural areas. The traditional use of camel as draught animal, for the purpose of transport of goods and agricultural work, has been drastically reduced during last few decades, due to advancements and cheaper availability of mechanical machineries. In this research paper we experimentally studied the camel powered electricity generation system at National Research Centre on Camels (NRCC) Bikaner. Camel Energy in form of high torque low speed can be converted into low torque high speed through motion converting system i.e. gear and pulley mechanism for high RPM output. This high RPM (more than 3000) output is used for electricity generation. The electricity generated can be used directly or stored in the battery and later may be used whenever it is required either for DC light or AC light using inverter. According to experimental study a camel can comfortably generate electricity up to 1KW by rotating shaft. The complete set up for electricity generation using camel power has been designed, developed and physically commissioned at National Research Centre on Camels (NRCC) Bikaner.

  15. Survey of aircraft electrical power systems

    NASA Technical Reports Server (NTRS)

    Lee, C. H.; Brandner, J. J.

    1972-01-01

    Areas investigated include: (1) load analysis; (2) power distribution, conversion techniques and generation; (3) design criteria and performance capabilities of hydraulic and pneumatic systems; (4) system control and protection methods; (5) component and heat transfer systems cooling; and (6) electrical system reliability.

  16. Renewable Electricity Futures Study. Volume 3: End-Use Electricity Demand

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hostick, D.; Belzer, D.B.; Hadley, S.W.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a futuremore » through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).« less

  17. Investigation of Perception in Electric Field based on Scholastic Tests of National Institute for Educational Policy Research

    NASA Astrophysics Data System (ADS)

    Eguchi, Kei; Sugimura, Tatsuya; Watanabe, Toshiya; Kurebayashi, Shuji

    To investigate the perception of science and technology of university students, the scholastic test concerning electric field was conducted in this paper. The scholastic test, which was conducted to university students, is based on the scholastic test provided by the National Institute for Educational Policy Research of Japan's Curriculum Research Center. The result of the scholastic test showed that 1. For the questions related to “A4(i): Maintenance check and prevention of accidents of equipment” in the junior high school government guidelines for teaching, the percentage of correct answer was the lowest and 2. Not only liberal arts course students but also science course students do not have sufficient perception concerning the capability of “Device and Creativity”, because the percentage of correct answer to the questions concerning “Device and Creativity” was about 70%. The results of this study will give us the directivity of electricity education.

  18. 75 FR 66038 - Planning Resource Adequacy Assessment Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... (R1 and R2) are assigned a violation risk factor (VRF) and violation severity level (VSL). However... base penalty amount. To do so, RFC is to assign a VRF to each Requirement and sub-Requirement of a... each VRF assignment.\\59\\ \\59\\ See North American Electric Reliability Corp., 119 FERC ] 61,145, order...

  19. Modeling the effects of changes in New Source Review on national SO{sub 2} and NOx emissions from electricity-generating units

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David A. Evans; Benjamin F. Hobbs; Craig Oren

    2007-03-15

    The Clean Air Act establishes New Source Review (NSR) programs that apply to the construction or modification of major stationary emissions sources. In 2002 and 2003, the U.S. Environmental Protection Agency revised its rules to narrow the applicability of NSR to facility renovations. Congress then mandated a National Research Council study of the effects of the rules. An electricity-sector model - the Integrated Planning Model (IPM) - was used to explore the possible effects of the equipment replacement provision (ERP), the principal NSR change that was to affect the power-generation industry. The studies focused in particular on coal-fired electricity generatingmore » units, EGUs, for two reasons. First, coal-fired EGUs are important contributors of these pollutants, accounting for approximately 70 and 20% of nations SO{sub 2} and NOx emissions in 2004, respectively. Second, the shares of total capacity of large coal-fired EGUs that lack flue-gas desulfurization to control SO{sub 2} and selective catalytic reduction to reduce NOx emissions are 62 and 63% respectively. Although the analysis cannot predict effects on local emissions, assuming that the Clean Air Interstate Rule (CAIR) is implemented, we find that stringent enforcement of the previous NSR rules would likely lead to no or limited decreases in national emissions compared to policies such as ERP. Our results indicate that tighter emissions caps could achieve further decreases in national emissions more cost-effectively than NSR programs. 15 refs., 3 figs., 1 tab.« less

  20. Storage Reliability of Missile Materiel Program. Storage Reliability Analysis Summary Report. Volume 1. Electrical and Electronic Devices

    DTIC Science & Technology

    1976-05-01

    since the platinum silicide and titanium metals also offer very low mobility to the alkaline ions, the BLSJ . is inert to sodium . Inversion and...gettering agents for sodium ions, thus making the cont&-nination far less mobile. The stability of the structural and electrical properties of the oxide...to be an effective barrier to sodium migration. In Beam Lead Sealed ,unction (BLSJ) devices, the silicon nitride seals the devices from sodium and

  1. Assuring long-term reliability of concentrator PV systems

    NASA Astrophysics Data System (ADS)

    McConnell, R.; Garboushian, V.; Brown, J.; Crawford, C.; Darban, K.; Dutra, D.; Geer, S.; Ghassemian, V.; Gordon, R.; Kinsey, G.; Stone, K.; Turner, G.

    2009-08-01

    Concentrator PV (CPV) systems have attracted significant interest because these systems incorporate the world's highest efficiency solar cells and they are targeting the lowest cost production of solar electricity for the world's utility markets. Because these systems are just entering solar markets, manufacturers and customers need to assure their reliability for many years of operation. There are three general approaches for assuring CPV reliability: 1) field testing and development over many years leading to improved product designs, 2) testing to internationally accepted qualification standards (especially for new products) and 3) extended reliability tests to identify critical weaknesses in a new component or design. Amonix has been a pioneer in all three of these approaches. Amonix has an internal library of field failure data spanning over 15 years that serves as the basis for its seven generations of CPV systems. An Amonix product served as the test CPV module for the development of the world's first qualification standard completed in March 2001. Amonix staff has served on international standards development committees, such as the International Electrotechnical Commission (IEC), in support of developing CPV standards needed in today's rapidly expanding solar markets. Recently Amonix employed extended reliability test procedures to assure reliability of multijunction solar cell operation in its seventh generation high concentration PV system. This paper will discuss how these three approaches have all contributed to assuring reliability of the Amonix systems.

  2. Electricity and Water Conservation on College and University Campuses in Response to National Competitions among Dormitories: Quantifying Relationships between Behavior, Conservation Strategies and Psychological Metrics.

    PubMed

    Petersen, John E; Frantz, Cynthia M; Shammin, Md Rumi; Yanisch, Tess M; Tincknell, Evan; Myers, Noel

    2015-01-01

    "Campus Conservation Nationals" (CCN) is a recurring, nation-wide electricity and water-use reduction competition among dormitories on college campuses. We conducted a two year empirical study of the competition's effects on resource consumption and the relationship between conservation, use of web technology and various psychological measures. Significant reductions in electricity and water use occurred during the two CCN competitions examined (n = 105,000 and 197,000 participating dorm residents respectively). In 2010, overall reductions during the competition were 4% for electricity and 6% for water. The top 10% of dorms achieved 28% and 36% reductions in electricity and water respectively. Participation was larger in 2012 and reductions were slightly smaller (i.e. 3% electricity). The fact that no seasonal pattern in electricity use was evident during non-competition periods suggests that results are attributable to the competition. Post competition resource use data collected in 2012 indicates that conservation behavior was sustained beyond the competition. Surveys were used to assess psychological and behavioral responses (n = 2,900 and 2,600 in 2010 and 2012 respectively). Electricity reductions were significantly correlated with: web visitation, specific conservation behaviors, awareness of the competition, motivation and sense of empowerment. However, participants were significantly more motivated than empowered. Perceived benefits of conservation were skewed towards global and future concerns while perceived barriers tended to be local. Results also suggest that competitions may be useful for "preaching beyond the choir"-engaging those who might lack prior intrinsic or political motivation. Although college life is distinct, certain conclusions related to competitions, self-efficacy, and motivation and social norms likely extend to other residential settings.

  3. 75 FR 45607 - Application To Export Electric Energy; Manitoba Hydro

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... that the proposed action will not adversely impact on the reliability of the U.S. electric power supply... United States to Canada pursuant to section 202(e) of the Federal Power Act (FPA). DATES: Comments... electric energy from the United States to Canada as a power marketer using existing international...

  4. Electric power supply and demand for the contiguous United States, 1981 - 1990

    NASA Astrophysics Data System (ADS)

    1981-07-01

    The outlook for electric power supply and demand in the United States decade 1981 to 1990 is reviewed from the perspective of reliability and adequacy of service. Electric power supply adequacy as projected for the nine Regional Reliability Council areas of the contiguous United States is reported as well as interruptible load data reported by the Councils. cogeneration is discussed. Each of the 27 electric regions (sub-areas of the nine Council areas) in the contiguous US are studied. A glossary of terms is given. Appendices describe the Council structure, and include a copy of the ERA-411 Manual, which contains all the items to which the Councils were asked to respond. The utilities with included data, the Staff Report, Estimated Electric Demand and Supply for Summer 1981, Contiguous United States dated May 1981 are included.

  5. HOMER: The hybrid optimization model for electric renewable

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lilienthal, P.; Flowers, L.; Rossmann, C.

    1995-12-31

    Hybrid renewable systems are often more cost-effective than grid extensions or isolated diesel generators for providing power to remote villages. There are a wide variety of hybrid systems being developed for village applications that have differing combinations of wind, photovoltaics, batteries, and diesel generators. Due to variations in loads and resources determining the most appropriate combination of these components for a particular village is a difficult modelling task. To address this design problem the National Renewable Energy Laboratory has developed the Hybrid Optimization Model for Electric Renewables (HOMER). Existing models are either too detailed for screening analysis or too simplemore » for reliable estimation of performance. HOMER is a design optimization model that determines the configuration, dispatch, and load management strategy that minimizes life-cycle costs for a particular site and application. This paper describes the HOMER methodology and presents representative results.« less

  6. High-reliability gas-turbine combined-cycle development program: Phase II. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hecht, K.G.; Sanderson, R.A.; Smith, M.J.

    This three-volume report presents the results of Phase II of the multiphase EPRI-sponsored High-Reliability Gas Turbine Combined-Cycle Development Program whose goal is to achieve a highly reliable gas turbine combined-cycle power plant, available by the mid-1980s, which would be an economically attractive baseload generation alternative for the electric utility industry. The Phase II program objective was to prepare the preliminary design of this power plant. This volume presents information of the reliability, availability, and maintainability (RAM) analysis of a representative plant and the preliminary design of the gas turbine, the gas turbine ancillaries, and the balance of plant including themore » steam turbine generator. To achieve the program goals, a gas turbine was incorporated which combined proven reliability characteristics with improved performance features. This gas turbine, designated the V84.3, is the result of a cooperative effort between Kraftwerk Union AG and United Technologies Corporation. Gas turbines of similar design operating in Europe under baseload conditions have demonstrated mean time between failures in excess of 40,000 hours. The reliability characteristics of the gas turbine ancillaries and balance-of-plant equipment were improved through system simplification and component redundancy and by selection of component with inherent high reliability. A digital control system was included with logic, communications, sensor redundancy, and mandual backup. An independent condition monitoring and diagnostic system was also included. Program results provide the preliminary design of a gas turbine combined-cycle baseload power plant. This power plant has a predicted mean time between failure of nearly twice the 3000-hour EPRI goal. The cost of added reliability features is offset by improved performance, which results in a comparable specific cost and an 8% lower cost of electricity compared to present market offerings.« less

  7. Electric and hybrid vehicles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacovides, L.J.; Cornell, E.P.; Kirk, R.

    1981-01-01

    A study of the energy utilization of gasoline and battery-electric powered special purpose vehicles is discussed along with the impact of electric cars on national energy consumption, the development of electric vehicles in Japan, the applicability of safety standards to electric and hybrid-vehicles, and crashworthiness tests on two electric vehicles. Aspects of energy storage are explored, taking into account a review of battery systems for electrically powered vehicles, the dynamic characterization of lead-acid batteries for vehicle applications, nickel-zinc storage batteries as energy sources for electric vehicles, and a high energy tubular battery for a 1800 kg payload electric delivery van.more » Subjects considered in connection with drive systems include the drive system of the DOE near-term electric vehicle, a high performance AC electric drive system, an electromechanical transmission for hybrid vehicle power trains, and a hybrid vehicle for fuel economy. Questions of vehicle development are examined, giving attention to the Electrovair electric car, special purpose urban cars, the system design of the electric test vehicle, a project for city center transport, and a digital computer program for simulating electric vehicle performance.« less

  8. Toward increased reliability in the electric power industry: direct temperature measurement in transformers using fiber optic sensors

    NASA Astrophysics Data System (ADS)

    McDonald, Greg

    1998-09-01

    Optimal loading, prevention of catastrophic failures and reduced maintenance costs are some of the benefits of accurate determination of hot spot winding temperatures in medium and high power transformers. Temperature estimates obtained using current theoretical models are not always accurate. Traditional technology (IR, thermocouples...) are unsuitable or inadequate for direct measurement. Nortech fiber-optic temperature sensors offer EMI immunity and chemical resistance and are a proven solution to the problem. The Nortech sensor's measurement principle is based on variations in the spectral absorption of a fiber-mounted semiconductor chip and probes are interchangeable with no need for recalibration. Total length of probe + extension can be up to several hundred meters allowing system electronics to be located in the control room or mounted in the transformer instrumentation cabinet. All of the sensor materials withstand temperatures up to 250 degree(s)C and have demonstrated excellent resistance to the harsh transformer environment (hot oil, kerosene). Thorough study of the problem and industry collaboration in testing and installation allows Nortech to identify and meet the need for durable probes, leak-proof feedthroughs, standard computer interfaces and measurement software. Refined probe technology, the method's simplicity and reliable calibration are all assets that should lead to growing acceptance of this type of direct measuring in the electric power industry.

  9. 78 FR 70163 - Communication of Operational Information between Natural Gas Pipelines and Electric Transmission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... a continued high level of reliability of interstate natural gas pipelines and that this will, in turn, ensure a continued high level of reliability of the electric transmission grid.\\40\\ Consumers...

  10. 30 CFR 77.503-1 - Electric conductors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Cable Engineers Association—National Electric Manufacturers Association in effect when such cables are... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Electric conductors. 77.503-1 Section 77.503-1... MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Electrical...

  11. 30 CFR 77.503-1 - Electric conductors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Cable Engineers Association—National Electric Manufacturers Association in effect when such cables are... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric conductors. 77.503-1 Section 77.503-1... MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Electrical...

  12. 30 CFR 77.503-1 - Electric conductors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Cable Engineers Association—National Electric Manufacturers Association in effect when such cables are... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Electric conductors. 77.503-1 Section 77.503-1... MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Electrical...

  13. 30 CFR 77.503-1 - Electric conductors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Cable Engineers Association—National Electric Manufacturers Association in effect when such cables are... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Electric conductors. 77.503-1 Section 77.503-1... MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Electrical...

  14. 30 CFR 77.503-1 - Electric conductors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Cable Engineers Association—National Electric Manufacturers Association in effect when such cables are... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Electric conductors. 77.503-1 Section 77.503-1... MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Electrical...

  15. TECHNICAL SUPPORT DOCUMENT: NATIONAL-SCALE MERCURY RISK ASSESSMENT SUPPORTING THE APPROPRIATE AND NECESSARY FINDING FOR COAL- AND OIL-FIRED ELECTRIC GENERATING UNITS

    EPA Science Inventory

    The EPA has completed a national-scale risk assessment for mercury to inform the appropriate and necessary determination for electric utility steam generating unites in the United States (U.S. EGU's), persuant to Section 112(n)(1)(A) of the Clean Air Act. This document describes...

  16. Distributed Generation of Electricity and its Environmental Impacts

    EPA Pesticide Factsheets

    Distributed generation refers to technologies that generate electricity at or near where it will be used. Learn about how distributed energy generation can support the delivery of clean, reliable power to additional customers.

  17. Renewable Electricity Futures Study. Volume 3. End-Use Electricity Demand

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hostick, Donna; Belzer, David B.; Hadley, Stanton W.

    2012-06-15

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a futuremore » through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%–90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT). Learn more at the RE Futures website. http://www.nrel.gov/analysis/re_futures/« less

  18. Electric motor-transformer aggregate in hermetic objects of transport vehicles

    NASA Astrophysics Data System (ADS)

    Zabora, Igor

    2017-10-01

    The construction and features of operation for new electrical unit - electric motor-transformer aggregate (DTA) are considered. Induction motors are intended for operation in hermetic plants with extreme conditions surrounding gas, steam-to-gas and liquid environment at a high temperature (to several hundred of degrees). Main objective of spent researches is the substantiation of possibility reliable and effective electric power transform with electric machine means directly in hermetic objects with extreme conditions environment by means of new DTA. The principle and job analysis of new disk induction motors of block-module type are observed.

  19. 78 FR 65978 - Application to Export Electric Energy; Brookfield Energy Marketing Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-258-D] Application to Export Electric Energy; Brookfield Energy Marketing Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Brookfield Energy Marketing Inc. (BEMI) has applied to renew its authority...

  20. 75 FR 57912 - Application To Export Electric Energy; Rainbow Energy Marketing Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-375] Application To Export Electric Energy; Rainbow Energy Marketing Corporation AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Rainbow Energy Marketing Corporation (Rainbow) has applied for authority to transmit...

  1. Reliability modeling of fault-tolerant computer based systems

    NASA Technical Reports Server (NTRS)

    Bavuso, Salvatore J.

    1987-01-01

    Digital fault-tolerant computer-based systems have become commonplace in military and commercial avionics. These systems hold the promise of increased availability, reliability, and maintainability over conventional analog-based systems through the application of replicated digital computers arranged in fault-tolerant configurations. Three tightly coupled factors of paramount importance, ultimately determining the viability of these systems, are reliability, safety, and profitability. Reliability, the major driver affects virtually every aspect of design, packaging, and field operations, and eventually produces profit for commercial applications or increased national security. However, the utilization of digital computer systems makes the task of producing credible reliability assessment a formidable one for the reliability engineer. The root of the problem lies in the digital computer's unique adaptability to changing requirements, computational power, and ability to test itself efficiently. Addressed here are the nuances of modeling the reliability of systems with large state sizes, in the Markov sense, which result from systems based on replicated redundant hardware and to discuss the modeling of factors which can reduce reliability without concomitant depletion of hardware. Advanced fault-handling models are described and methods of acquiring and measuring parameters for these models are delineated.

  2. Electric Power Quarterly, October-December 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1984-04-01

    The Electric Power Quarterly (EPQ) provides comprehensive information about the electric utilities' cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks on a plant and company level, as well as State, census region, and national aggregates.

  3. Distribution System Reliability Analysis for Smart Grid Applications

    NASA Astrophysics Data System (ADS)

    Aljohani, Tawfiq Masad

    Reliability of power systems is a key aspect in modern power system planning, design, and operation. The ascendance of the smart grid concept has provided high hopes of developing an intelligent network that is capable of being a self-healing grid, offering the ability to overcome the interruption problems that face the utility and cost it tens of millions in repair and loss. To address its reliability concerns, the power utilities and interested parties have spent extensive amount of time and effort to analyze and study the reliability of the generation and transmission sectors of the power grid. Only recently has attention shifted to be focused on improving the reliability of the distribution network, the connection joint between the power providers and the consumers where most of the electricity problems occur. In this work, we will examine the effect of the smart grid applications in improving the reliability of the power distribution networks. The test system used in conducting this thesis is the IEEE 34 node test feeder, released in 2003 by the Distribution System Analysis Subcommittee of the IEEE Power Engineering Society. The objective is to analyze the feeder for the optimal placement of the automatic switching devices and quantify their proper installation based on the performance of the distribution system. The measures will be the changes in the reliability system indices including SAIDI, SAIFI, and EUE. The goal is to design and simulate the effect of the installation of the Distributed Generators (DGs) on the utility's distribution system and measure the potential improvement of its reliability. The software used in this work is DISREL, which is intelligent power distribution software that is developed by General Reliability Co.

  4. The Reliability of Neurons

    PubMed Central

    Bullock, Theodore Holmes

    1970-01-01

    The prevalent probabilistic view is virtually untestable; it remains a plausible belief. The cases usually cited can not be taken as evidence for it. Several grounds for this conclusion are developed. Three issues are distinguished in an attempt to clarify a murky debate: (a) the utility of probabilistic methods in data reduction, (b) the value of models that assume indeterminacy, and (c) the validity of the inference that the nervous system is largely indeterministic at the neuronal level. No exception is taken to the first two; the second is a private heuristic question. The third is the issue to which the assertion in the first two sentences is addressed. Of the two kinds of uncertainty, statistical mechanical (= practical unpredictability) as in a gas, and Heisenbergian indeterminancy, the first certainly exists, the second is moot at the neuronal level. It would contribute to discussion to recognize that neurons perform with a degree of reliability. Although unreliability is difficult to establish, to say nothing of measure, evidence that some neurons have a high degree of reliability, in both connections and activity is increasing greatly. An example is given from sternarchine electric fish. PMID:5462670

  5. A guide to onboard checkout. Volume 3: Electrical power

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The baseline electrical power subsystem for a space station is considered. The subsystem was anlayzed in order to define onboard checkout requirements. Reliability, failure effects, and maintenance are discussed.

  6. The welfare effects of integrating renewable energy into electricity markets

    NASA Astrophysics Data System (ADS)

    Lamadrid, Alberto J.

    The challenges of deploying more renewable energy sources on an electric grid are caused largely by their inherent variability. In this context, energy storage can help make the electric delivery system more reliable by mitigating this variability. This thesis analyzes a series of models for procuring electricity and ancillary services for both individuals and social planners with high penetrations of stochastic wind energy. The results obtained for an individual decision maker using stochastic optimization are ambiguous, with closed form solutions dependent on technological parameters, and no consideration of the system reliability. The social planner models correctly reflect the effect of system reliability, and in the case of a Stochastic, Security Constrained Optimal Power Flow (S-SC-OPF or SuperOPF), determine reserve capacity endogenously so that system reliability is maintained. A single-period SuperOPF shows that including ramping costs in the objective function leads to more wind spilling and increased capacity requirements for reliability. However, this model does not reflect the inter temporal tradeoffs of using Energy Storage Systems (ESS) to improve reliability and mitigate wind variability. The results with the multiperiod SuperOPF determine the optimum use of storage for a typical day, and compare the effects of collocating ESS at wind sites with the same amount of storage (deferrable demand) located at demand centers. The collocated ESS has slightly lower operating costs and spills less wind generation compared to deferrable demand, but the total amount of conventional generating capacity needed for system adequacy is higher. In terms of the total system costs, that include the capital cost of conventional generating capacity, the costs with deferrable demand is substantially lower because the daily demand profile is flattened and less conventional generation capacity is then needed for reliability purposes. The analysis also demonstrates that the

  7. Flat conductor cable for electrical packaging

    NASA Technical Reports Server (NTRS)

    Angele, W.

    1972-01-01

    Flat conductor cable (FCC) is relatively new, highly promising means for electrical packaging and system integration. FCC offers numerous desirable traits (weight, volume and cost savings, flexibility, high reliability, predictable and repeatable electrical characteristics) which make it extremely attractive as a packaging medium. FCC, today, finds wide application in everything from integration of lunar equipment to the packaging of electronics in nuclear submarines. Described are cable construction and means of termination, applicable specifications and standards, and total FCC systems. A list of additional sources of data is also included for more intensive study.

  8. Alcohol Drinking Onset: A Reliability Study

    ERIC Educational Resources Information Center

    Prause, JoAnn; Dooley, David; Ham-Rowbottom, Kathleen A.; Emptage, Nicholas

    2007-01-01

    Early alcohol drinking onset (ADO) is associated with adult alcohol misuse, but the accuracy of ADO is unclear. Reliability of self-reported ADO was studied in two panels of the National Longitudinal Survey of Youth. For the Adult sample (n = 6,215), the intraclass correlation coefficient (ICC) was 0.36. Older respondents had higher reliabilities…

  9. National Economic Value Assessment of Plug-in Electric Vehicles: Volume I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Melaina, Marc; Bush, Brian; Eichman, Joshua

    The adoption of plug-in electric vehicles (PEVs) can reduce household fuel expenditures by substituting electricity for gasoline while reducing greenhouse gas emissions and petroleum imports. A scenario approach is employed to provide insights into the long-term economic value of increased PEV market growth across the United States. The analytic methods estimate fundamental costs and benefits associated with an economic allocation of PEVs across households based upon household driving patterns, projected vehicle cost and performance attributes, and simulations of a future electricity grid. To explore the full technological potential of PEVs and resulting demands on the electricity grid, very high PEVmore » market growth projections from previous studies are relied upon to develop multiple future scenarios.« less

  10. Documents About the Approval to Dispose of Less than 50 Parts Per Million (ppm) PCB Remediation Waste Issued to National Rural Electric Cooperative Association (NRECA) Members

    EPA Pesticide Factsheets

    Documents About the Approval to Dispose of Less than 50 Parts Per Million (ppm) Polychlorinated Biphenyl (PCB) Remediation Waste Issued to National Rural Electric Cooperative Association (NRECA) Members

  11. Reliability improvement methods for sapphire fiber temperature sensors

    NASA Astrophysics Data System (ADS)

    Schietinger, C.; Adams, B.

    1991-08-01

    Mechanical, optical, electrical, and software design improvements can be brought to bear in the enhancement of fiber-optic sapphire-fiber temperature measurement tool reliability in harsh environments. The optical fiber thermometry (OFT) equipment discussed is used in numerous process industries and generally involves a sapphire sensor, an optical transmission cable, and a microprocessor-based signal analyzer. OFT technology incorporating sensors for corrosive environments, hybrid sensors, and two-wavelength measurements, are discussed.

  12. Reliability Assessment Approach for Stirling Convertors and Generators

    NASA Technical Reports Server (NTRS)

    Shah, Ashwin R.; Schreiber, Jeffrey G.; Zampino, Edward; Best, Timothy

    2004-01-01

    Stirling power conversion is being considered for use in a Radioisotope Power System for deep-space science missions because it offers a multifold increase in the conversion efficiency of heat to electric power. Quantifying the reliability of a Radioisotope Power System that utilizes Stirling power conversion technology is important in developing and demonstrating the capability for long-term success. A description of the Stirling power convertor is provided, along with a discussion about some of the key components. Ongoing efforts to understand component life, design variables at the component and system levels, related sources, and the nature of uncertainties is discussed. The requirement for reliability also is discussed, and some of the critical areas of concern are identified. A section on the objectives of the performance model development and a computation of reliability is included to highlight the goals of this effort. Also, a viable physics-based reliability plan to model the design-level variable uncertainties at the component and system levels is outlined, and potential benefits are elucidated. The plan involves the interaction of different disciplines, maintaining the physical and probabilistic correlations at all the levels, and a verification process based on rational short-term tests. In addition, both top-down and bottom-up coherency were maintained to follow the physics-based design process and mission requirements. The outlined reliability assessment approach provides guidelines to improve the design and identifies governing variables to achieve high reliability in the Stirling Radioisotope Generator design.

  13. Reliability Quantification of Advanced Stirling Convertor (ASC) Components

    NASA Technical Reports Server (NTRS)

    Shah, Ashwin R.; Korovaichuk, Igor; Zampino, Edward

    2010-01-01

    The Advanced Stirling Convertor, is intended to provide power for an unmanned planetary spacecraft and has an operational life requirement of 17 years. Over this 17 year mission, the ASC must provide power with desired performance and efficiency and require no corrective maintenance. Reliability demonstration testing for the ASC was found to be very limited due to schedule and resource constraints. Reliability demonstration must involve the application of analysis, system and component level testing, and simulation models, taken collectively. Therefore, computer simulation with limited test data verification is a viable approach to assess the reliability of ASC components. This approach is based on physics-of-failure mechanisms and involves the relationship among the design variables based on physics, mechanics, material behavior models, interaction of different components and their respective disciplines such as structures, materials, fluid, thermal, mechanical, electrical, etc. In addition, these models are based on the available test data, which can be updated, and analysis refined as more data and information becomes available. The failure mechanisms and causes of failure are included in the analysis, especially in light of the new information, in order to develop guidelines to improve design reliability and better operating controls to reduce the probability of failure. Quantified reliability assessment based on fundamental physical behavior of components and their relationship with other components has demonstrated itself to be a superior technique to conventional reliability approaches based on utilizing failure rates derived from similar equipment or simply expert judgment.

  14. Stretchable biocompatible electronics by embedding electrical circuitry in biocompatible elastomers.

    PubMed

    Jahanshahi, Amir; Salvo, Pietro; Vanfleteren, Jan

    2012-01-01

    Stretchable and curvilinear electronics has been used recently for the fabrication of micro systems interacting with the human body. The applications range from different kinds of implantable sensors inside the body to conformable electrodes and artificial skins. One of the key parameters in biocompatible stretchable electronics is the fabrication of reliable electrical interconnects. Although very recent literature has reported on the reliability of stretchable interconnects by cyclic loading, work still needs to be done on the integration of electrical circuitry composed of rigid components and stretchable interconnects in a biological environment. In this work, the feasibility of a developed technology to fabricate simple electrical circuits with meander shaped stretchable interconnects is presented. Stretchable interconnects are 200 nm thin Au layer supported with polyimide (PI). A stretchable array of light emitting diodes (LEDs) is embedded in biocompatible elastomer using this technology platform and it features a 50% total elongation.

  15. Development of social capital scale from a national longitudinal survey and examination of its validity and reliability.

    PubMed

    Aiba, Miyuki; Tachikawa, Hirokazu; Nakamine, Shin; Takahashi, Sho; Noguchi, Haruko; Takahashi, Hideto; Tamiya, Nanako

    2017-01-01

    Objectives Social capital consists of two subordinate concepts; first one is structural formal, structural informal, or cognitive and second one is bonding or bridging. This study was designed to develop a social capital scale using samples from a national longitudinal survey and evaluate the validity and test-retest reliability of the scale.Methods Data were collected from a nationwide panel survey, the "Longitudinal Survey of Middle-aged and Elderly Persons." Individuals aged 50-59 years living in Japan were selected by stratified random sampling in the first wave conducted in 2005. The first (n=34,240) and second (n=32,285) sets of data were used for Phase 1, and the sixth (n=26,220) and seventh (n=25,321) sets of data were used for Phase 2. In regard to first subordinate concept, the occurrence of six selected social activities with "neighborhood association" and "NPOs, or Public Interest Corporations" were calculated as the structural formal index, and the occurrence of six selected social activities with "families or friends" and "colleagues" were calculated as the structural informal index. Moreover, satisfaction with social activities (community activities, support for the elderly, and others) was used as the cognitive index. In regard to second subordinate concept, the bonding index was calculated using "families or friends," "colleagues," and "neighborhood association;" the bridging index was calculated using "NPOs or Public Interest Corporations." The diagnoses of heart disease, stroke, and cancer (yes=1, no=0) and self-rated health (1 item, 6-point scale) were used as variables for determining validity.Results We categorized social capital indices into subordinate concepts based on the construct of social capital defined by professional agreement to assess content validity. The results showed that this survey questionnaire was constructed using items that assessed all the subordinate concepts. Hierarchical Linear Modeling examined the relationship

  16. 77 FR 1474 - Application To Export Electric Energy; AEP Energy Partners, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-318-B] Application To Export Electric Energy; AEP Energy Partners, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: AEP Energy Partners, Inc. (AEPEP) has applied to renew its authority to transmit...

  17. Development of battery management system for nickel-metal hydride batteries in electric vehicle applications

    NASA Astrophysics Data System (ADS)

    Jung, Do Yang; Lee, Baek Haeng; Kim, Sun Wook

    Electric vehicle (EV) performance is very dependent on traction batteries. For developing electric vehicles with high performance and good reliability, the traction batteries have to be managed to obtain maximum performance under various operating conditions. Enhancement of battery performance can be accomplished by implementing a battery management system (BMS) that plays an important role in optimizing the control mechanism of charge and discharge of the batteries as well as monitoring the battery status. In this study, a BMS has been developed for maximizing the use of Ni-MH batteries in electric vehicles. This system performs several tasks: the control of charging and discharging, overcharge and over-discharge protection, the calculation and display of state-of-charge (SOC), safety, and thermal management. The BMS is installed in and tested in a DEV5-5 electric vehicle developed by Daewoo Motor Co. and the Institute for Advanced Engineering in Korea. Eighteen modules of a Panasonic nickel-metal hydride (Ni-MH) battery, 12 V, 95 A h, are used in the DEV5-5. High accuracy within a range of 3% and good reliability are obtained. The BMS can also improve the performance and cycle-life of the Ni-MH battery peak, as well as the reliability and the safety of the electric vehicles.

  18. Advanced Stirling Convertor Heater Head Durability and Reliability Quantification

    NASA Technical Reports Server (NTRS)

    Krause, David L.; Shah, Ashwin R.; Korovaichuk, Igor; Kalluri, Sreeramesh

    2008-01-01

    The National Aeronautics and Space Administration (NASA) has identified the high efficiency Advanced Stirling Radioisotope Generator (ASRG) as a candidate power source for long duration Science missions, such as lunar applications, Mars rovers, and deep space missions, that require reliable design lifetimes of up to 17 years. Resistance to creep deformation of the MarM-247 heater head (HH), a structurally critical component of the ASRG Advanced Stirling Convertor (ASC), under high temperatures (up to 850 C) is a key design driver for durability. Inherent uncertainties in the creep behavior of the thin-walled HH and the variations in the wall thickness, control temperature, and working gas pressure need to be accounted for in the life and reliability prediction. Due to the availability of very limited test data, assuring life and reliability of the HH is a challenging task. The NASA Glenn Research Center (GRC) has adopted an integrated approach combining available uniaxial MarM-247 material behavior testing, HH benchmark testing and advanced analysis in order to demonstrate the integrity, life and reliability of the HH under expected mission conditions. The proposed paper describes analytical aspects of the deterministic and probabilistic approaches and results. The deterministic approach involves development of the creep constitutive model for the MarM-247 (akin to the Oak Ridge National Laboratory master curve model used previously for Inconel 718 (Special Metals Corporation)) and nonlinear finite element analysis to predict the mean life. The probabilistic approach includes evaluation of the effect of design variable uncertainties in material creep behavior, geometry and operating conditions on life and reliability for the expected life. The sensitivity of the uncertainties in the design variables on the HH reliability is also quantified, and guidelines to improve reliability are discussed.

  19. Visual Inspection Reliability for Precision Manufactured Parts.

    PubMed

    See, Judi E

    2015-12-01

    Sandia National Laboratories conducted an experiment for the National Nuclear Security Administration to determine the reliability of visual inspection of precision manufactured parts used in nuclear weapons. Visual inspection has been extensively researched since the early 20th century; however, the reliability of visual inspection for nuclear weapons parts has not been addressed. In addition, the efficacy of using inspector confidence ratings to guide multiple inspections in an effort to improve overall performance accuracy is unknown. Further, the workload associated with inspection has not been documented, and newer measures of stress have not been applied. Eighty-two inspectors in the U.S. Nuclear Security Enterprise inspected 140 parts for eight different defects. Inspectors correctly rejected 85% of defective items and incorrectly rejected 35% of acceptable parts. Use of a phased inspection approach based on inspector confidence ratings was not an effective or efficient technique to improve the overall accuracy of the process. Results did verify that inspection is a workload-intensive task, dominated by mental demand and effort. Hits for Nuclear Security Enterprise inspection were not vastly superior to the industry average of 80%, and they were achieved at the expense of a high scrap rate not typically observed during visual inspection tasks. This study provides the first empirical data to address the reliability of visual inspection for precision manufactured parts used in nuclear weapons. Results enhance current understanding of the process of visual inspection and can be applied to improve reliability for precision manufactured parts. © 2015, Human Factors and Ergonomics Society.

  20. Human Reliability Program Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Landers, John; Rogers, Erin; Gerke, Gretchen

    A Human Reliability Program (HRP) is designed to protect national security as well as worker and public safety by continuously evaluating the reliability of those who have access to sensitive materials, facilities, and programs. Some elements of a site HRP include systematic (1) supervisory reviews, (2) medical and psychological assessments, (3) management evaluations, (4) personnel security reviews, and (4) training of HRP staff and critical positions. Over the years of implementing an HRP, the Department of Energy (DOE) has faced various challenges and overcome obstacles. During this 4-day activity, participants will examine programs that mitigate threats to nuclear security andmore » the insider threat to include HRP, Nuclear Security Culture (NSC) Enhancement, and Employee Assistance Programs. The focus will be to develop an understanding of the need for a systematic HRP and to discuss challenges and best practices associated with mitigating the insider threat.« less

  1. Postfact phenomena of the wet-steam flow electrization in turbines

    NASA Astrophysics Data System (ADS)

    Tarelin, A. A.

    2017-11-01

    Physical processes occurring in a turbine with natural electrization of a humidity-steam flow and their effect on efficiency and reliability of the turbine operation has been considered. Causes of the electrical potential occurrence on a rotor shaft are analyzed. The wet steam's electrization exposure on the electrical potential that is one of the major factors of bearings' electroerosion has been demonstrated on the full-scale installation. Hydrogen formation in wheelspace of the turbine as a result of electrochemical processes and electric field exposure of the space charge has been considered. Hydrogen concentration dependence on a volume charge density in the steam flow has been determined. It is stated that the processes occurring behind the final stage of wet-steam turbines are similar to the ones in elaerosol ectrostatic generators. It has been demonstrated that this phenomenon causes the flow's temporal inhibition and starts pulsations. These factors' impact on power loss of the turbine has been evaluated and recommendations for their elimination have been offered. It has been determined that motions of charged drops can cause self-maintained discharges inside of the flow and between the flow and grounded surfaces that are accompanied by electromagnetic radiation of the wide spectrum. The integrated studies have shown that physical phenomena occurring due to natural electrization negatively affect efficiency and reliability of the turbine operation. Practical recommendations allowing one to minimize the negative effects of the flow natural electrization process have been offered.

  2. 77 FR 50487 - Application To Export Electric Energy; RBC Energy Services LP

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-328-A] Application To Export Electric Energy; RBC Energy Services LP AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: RBC Energy Services LP (RBC Energy) has applied to renew its authority to transmit...

  3. 75 FR 76962 - Application To Export Electric Energy; MAG Energy Solutions, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-306-A] Application To Export Electric Energy; MAG Energy Solutions, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application. SUMMARY: MAG Energy Solutions, Inc. (MAG E.S.) has applied to renew its authority to transmit...

  4. 77 FR 20805 - Application to Export Electric Energy; PPL EnergyPlus, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-210-C] Application to Export Electric Energy; PPL EnergyPlus, LLC AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: PPL EnergyPlus, LLC. (PPL EnergyPlus) has applied to renew its authority to transmit...

  5. PV industry growth and module reliability in Thailand

    NASA Astrophysics Data System (ADS)

    Chenvidhya, Dhirayut; Seapan, Manit; Sangpongsanont, Yaowanee; Chenvidhya, Tanokkorn; Limsakul, Chamnan; Songprakorp, Roongrojana

    2015-09-01

    The PV applications in Thailand are now installed more than 1.2 GWp cumulatively. It is due to the National Renewable Energy Program and its targets. In the latest Alternative Energy Development Plan (AEDP), the PV electricity production target has increased from 2 GWp to 3 GWp. With this rapid growth, customers and manufacturers seek for module standard testing. So far over one thousands of PV modules per annum have been tested since 2012. The normal tests include type approval test according to TIS standard, acceptance test and testing for local standard development. For type test, the most module failure was found during damp heat test. For annual evaluation test, the power degradation and delamination of power was found between 0 to 6 percent from its nameplate after deployment of 0 to 5 years in the field. For thin-film module, the degradation and delamination was found in range of 0 to 13 percent (about 5 percent on average) from its nameplate for the modules in operation with less than 5 years. However, for the PV modules at the reference site on campus operated for 12 years, the power degradation was ranging from 10 to 15 percent. Therefore, a long term performance assessment needs to be considered to ensure the system reliability.

  6. Teflon/SiO₂ Bilayer Passivation for Improving the Electrical Reliability of Oxide TFTs Fabricated Using a New Two-Photomask Self-Alignment Process.

    PubMed

    Fan, Ching-Lin; Shang, Ming-Chi; Li, Bo-Jyun; Lin, Yu-Zuo; Wang, Shea-Jue; Lee, Win-Der; Hung, Bohr-Ran

    2015-04-13

    This study proposes a two-photomask process for fabricating amorphous indium-gallium-zinc oxide (a-IGZO) thin-film transistors (TFTs) that exhibit a self-aligned structure. The fabricated TFTs, which lack etching-stop (ES) layers, have undamaged a-IGZO active layers that facilitate superior performance. In addition, we demonstrate a bilayer passivation method that uses a polytetrafluoroethylene (Teflon) and SiO₂ combination layer for improving the electrical reliability of the fabricated TFTs. Teflon was deposited as a buffer layer through thermal evaporation. The Teflon layer exhibited favorable compatibility with the underlying IGZO channel layer and effectively protected the a-IGZO TFTs from plasma damage during SiO₂ deposition, resulting in a negligible initial performance drop in the a-IGZO TFTs. Compared with passivation-free a-IGZO TFTs, passivated TFTs exhibited superior stability even after 168 h of aging under ambient air at 95% relative humidity.

  7. Renewable Electricity Futures Study. Volume 2: Renewable Electricity Generation and Storage Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Augustine, C.; Bain, R.; Chapman, J.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a futuremore » through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).« less

  8. Fuzzy Logic as a Tool to Compare Reliability of Torsion Bar System

    DTIC Science & Technology

    2009-12-17

    A paper by Arati Dexit, Harpreet Singh and Kassem Saab presents a possible scenario of simulating reliability using Fuzzy Logic.[4] This...29, Issue: 3 [2]. Weibell.com: “ Overview of System Reliability” [3]. Arati MDixit, Harpreet Singh, and Kassem Saab Department of Electrical

  9. Electric power annual 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics formore » the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.« less

  10. Testing and development of electric vehicle batteries for EPRI Electric Transportation Program

    NASA Astrophysics Data System (ADS)

    1985-11-01

    Argonne National Laboratory conducted an electric-vehicle battery testing and development program for the Electric Power Research Institute. As part of this program, eighteen battery modules previously developed by Johnson Controls, Inc. were tested. This type of battery (EV-2300 - an improved state-of-the-art lead-acid battery) was designed specifically for improved performance, range, and life in electric vehicles. In order to obtain necessary performance data, the batteries were tested under various duty cycles typical of normal service. This program, supported by the Electric Power Research Institute, consisted of three tasks: determination of the effect of cycle life vs peak power and rest period, determination of the impact of charge method on cycle life, and evaluation of the EV-2300 battery system. Two supporting studies were also carried out: one on thermal management of electric-vehicle batteries and one on enhanced utilization of active material in lead-acid batteries.

  11. A Historical and Engineering View of Power Transmission Systems in Kansai Electric Power Co., Inc.

    NASA Astrophysics Data System (ADS)

    Ito, Shunichi; Akiyama, Tetsuo

    During our work in operations related to power transmission technology, we have encountered various natural calamities and man-made disasters. Over the years, we learned many valuable lessons from these bitter experiences, and we now have more reliable, cost-effective and flexible electric power systems. This paper describes the new technologies we have introduced in the facilities making up the power systems and how we operate these systems and facilities. It also takes up the Southern Hyogo Earthquake and loss of Ohi nuclear power generation due to galloping phenomena as typical examples showing how a set of measures as mentioned above substantially improved the reliability of the electric power systems to such an extent that the Japanese electric power systems have attained the world's highest level of reliability. These facts prove that steady and continuous efforts are a prerequisite to success for all power engineers.

  12. The Variability and Intermittency of Wind and Solar Power Can Be Overcome Without Storage By Using the National Energy With Weather System (NEWS) Simulator To Design A National US Electric (and Energy) Sector

    NASA Astrophysics Data System (ADS)

    Clack, C.; MacDonald, A. E.; Wilczak, J. M.; Alexander, A.; Dunbar, A. D.; Xie, Y.; Picciano, P.; Paine, J.; Terry, L.; Marquis, M.

    2015-12-01

    The importance of weather-driven renewable energies for the United States energy portfolio is growing. The main perceived problems with weather-driven renewable energies are their intermittent nature, low power density, and high costs. The Cooperative Institute for the Research in Environmental Sciences at the University of Colorado collaborated with the Earth Systems Research Laboratory of the National Oceanic and Atmospheric Administration to construct a mathematical optimization of a reduced form of the US electric sector. Care was taken to retain salient features of the electric sector, while allowing for detailed weather and power data to be incorporated for wind and solar energies. The National Energy with Weather System (NEWS) simulator was created. With the NEWS simulator tests can be performed that are unique and insightful. The simulator can maintain the status quo and build out a system following costs or imposed targets for carbon dioxide emission reductions. It can find the least cost electric sector for each state, or find a national power system that incorporates vast amounts of variable generation. In the current presentation, we will focus on one of the most unique aspects of the NEWS simulator; the ability to specify a specific amount of wind and/or solar each hour for a three-year historical period for the least total cost. The simulator can find where to place wind and solar to reduce variability (ramping requirements for back-up generators). The amount of variable generation each hour is very different to an RPS type standard because the generators need to work in concert for long periods of time. The results indicate that for very similar costs the amount of back-up generation (natural gas or storage) can be reduced significantly.

  13. Renewable Electricity Futures Study Executive Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mai, Trieu; Sandor, Debra; Wiser, Ryan

    2012-12-01

    The Renewable Electricity Futures Study (RE Futures) provides an analysis of the grid integration opportunities, challenges, and implications of high levels of renewable electricity generation for the U.S. electric system. The study is not a market or policy assessment. Rather, RE Futures examines renewable energy resources and many technical issues related to the operability of the U.S. electricity grid, and provides initial answers to important questions about the integration of high penetrations of renewable electricity technologies from a national perspective. RE Futures results indicate that a future U.S. electricity system that is largely powered by renewable sources is possible andmore » that further work is warranted to investigate this clean generation pathway.« less

  14. Survey on the implementation and reliability of CubeSat electrical bus interfaces

    NASA Astrophysics Data System (ADS)

    Bouwmeester, Jasper; Langer, Martin; Gill, Eberhard

    2017-06-01

    This paper provides results and conclusions on a survey on the implementation and reliability aspects of CubeSat bus interfaces, with an emphasis on the data bus and power distribution. It provides recommendations for a future CubeSat bus standard. The survey is based on a literature study and a questionnaire representing 60 launched CubeSats and 44 to be launched CubeSats. It is found that the bus interfaces are not the main driver for mission failures. However, it is concluded that the Inter Integrated Circuit (I2C) data bus, as implemented in a great majority of the CubeSats, caused some catastrophic satellite failures and a vast amount of bus lockups. The power distribution may lead to catastrophic failures if the power lines are not protected against overcurrent. A connector and wiring standard widely implemented in CubeSats is based on the PC/104 standard. Most participants find the 104 pin connector of this standard too large. For a future CubeSat bus interface standard, it is recommended to implement a reliable data bus, a power distribution with overcurrent protection and a wiring harness with smaller connectors compared with PC/104.

  15. Renewable Electricity Futures (Presentation)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hand, M. M.

    2012-08-01

    This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented to the 2012 Western Conference of Public Service Commissioners, during their June, 2012, meeting. The Western Conference of Public Service Commissioners is a regional association within the National Association of Regulatory Utility Commissioners (NARUC).

  16. Joint Lead-Free Solder Test Program for High Reliability Military and Space Applications

    NASA Technical Reports Server (NTRS)

    Brown, Christina

    2004-01-01

    Current and future space and defense systems face potential risks from the continued use of tin-lead solder, including: compliance with current environmental regulations, concerns about potential environmental legislation banning lead-containing products, reduced mission readiness, and component obsolescence with lead surface finishes. For example, the United States Environmental Protection Agency (USEPA) has lowered the Toxic Chemical Release reporting threshold for lead to 100 pounds. Overseas, the Waste Electrical and Electronic Equipment (WEEE) and the Restriction on Hazardous Substances (RoHS) Dicctives in Europe and similar mandates in Japan have instilled concern that a legislative body will prohibit the use of lead in aerospace/military electronics soldering. Any potential banning of lead compounds could reduce the supplier base and adversely affect the readiness of missions led by the National Aeronautics and Space Administration (NASA) and the U.S. Department of Defense (DoD). Before considering lead-free electronics for system upgrades or future designs, however, it is important for the DoD and NASA to know whether lead-free solders can meet their systems' requirements. No single lead-free solder is likely to qualify for all defense and space applications. Therefore, it is important to validate alternative solders for discrete applications. As a result of the need for comprehensive test data on the reliability of lead-free solders, a partnership was formed between the DoD, NASA, and several original equipment manufactures (OEMs) to conduct solder-joint reliability (laboratory) testing of three lead-free solder alloys on newly manufactured and reworked circuit cards to generate performance data for high-reliability (IPC Class 3) applications.

  17. Regional Variability and Uncertainty of Electric Vehicle Life Cycle CO₂ Emissions across the United States.

    PubMed

    Tamayao, Mili-Ann M; Michalek, Jeremy J; Hendrickson, Chris; Azevedo, Inês M L

    2015-07-21

    We characterize regionally specific life cycle CO2 emissions per mile traveled for plug-in hybrid electric vehicles (PHEVs) and battery electric vehicles (BEVs) across the United States under alternative assumptions for regional electricity emission factors, regional boundaries, and charging schemes. We find that estimates based on marginal vs average grid emission factors differ by as much as 50% (using National Electricity Reliability Commission (NERC) regional boundaries). Use of state boundaries versus NERC region boundaries results in estimates that differ by as much as 120% for the same location (using average emission factors). We argue that consumption-based marginal emission factors are conceptually appropriate for evaluating the emissions implications of policies that increase electric vehicle sales or use in a region. We also examine generation-based marginal emission factors to assess robustness. Using these two estimates of NERC region marginal emission factors, we find the following: (1) delayed charging (i.e., starting at midnight) leads to higher emissions in most cases due largely to increased coal in the marginal generation mix at night; (2) the Chevrolet Volt has higher expected life cycle emissions than the Toyota Prius hybrid electric vehicle (the most efficient U.S. gasoline vehicle) across the U.S. in nearly all scenarios; (3) the Nissan Leaf BEV has lower life cycle emissions than the Prius in the western U.S. and in Texas, but the Prius has lower emissions in the northern Midwest regardless of assumed charging scheme and marginal emissions estimation method; (4) in other regions the lowest emitting vehicle depends on charge timing and emission factor estimation assumptions.

  18. Results from the Operational Testing of the General Electric Smart Grid Capable Electric Vehicle Supply Equipment (EVSE)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, Richard Barney; Scoffield, Don; Bennett, Brion

    2013-12-01

    The Idaho National Laboratory conducted testing and analysis of the General Electric (GE) smart grid capable electric vehicle supply equipment (EVSE), which was a deliverable from GE for the U.S. Department of Energy FOA-554. The Idaho National Laboratory has extensive knowledge and experience in testing advanced conductive and wireless charging systems though INL’s support of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. This document details the findings from the EVSE operational testing conducted at the Idaho National Laboratory on the GE smart grid capable EVSE. The testing conducted on the EVSE included energy efficiency testing, SAE J1772 functionalitymore » testing, abnormal conditions testing, and charging of a plug-in vehicle.« less

  19. 76 FR 23470 - Version One Regional Reliability Standard for Transmission Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... (BPA), WECC, and San Diego Gas & Electric Company (SDG&E). II. Discussion 16. The Commission approves... unknown operating state. 23. Similarly, BPA states that it is unnecessary to carry over from TOP-STD-007-0... as TOP-004-2. BPA also notes that the continent-wide Reliability Standard, TOP-007-0, does not...

  20. Advancing electric-vehicle development with pure-lead-tin battery technology

    NASA Astrophysics Data System (ADS)

    O'Brien, W. A.; Stickel, R. B.; May, G. J.

    Electric-vehicle (EV) development continues to make solid progress towards extending vehicle range, reliability and ease of use, aided significantly by technological advances in vehicle systems. There is, however, a widespread misconception that current battery technologies are not capable of meeting even the minimum user requirements that would launch EVs into daily use. Existing pure-lead-tin technology is moving EVs out of research laboratories and onto the streets, in daily side-by-side operation with vehicles powered by conventional gasoline and alternative fuels. This commercially available battery technology can provide traffic-compatible performance in a reliable and affordable manner, and can be used for either pure EVs or hybrid electric vehicles (HEVs). Independent results obtained when applying lead-tin batteries in highly abusive conditions, both electrically and environmentally, are presented. The test fleet of EVs is owned and operated by Arizona Public Service (APS), an electric utility in Phoenix, AZ, USA. System, charger and battery development will be described. This gives a single charge range of up to 184 km at a constant speed of 72 km h -1, and with suitable opportunity charging, a 320 km range in a normal 8 h working day.

  1. Preliminary designs for 25 kWe advanced Stirling conversion systems for dish electric applications

    NASA Technical Reports Server (NTRS)

    Shaltens, Richard K.; Schreiber, Jeffrey G.

    1990-01-01

    Under the Department of Energy's (DOE) Solar Thermal Technology Program, Sandia National Laboratories is evaluating heat engines for terrestrial Solar Distributed Heat Receivers. The Stirling engine has been identified by Sandia as one of the most promising engines for terrestrial applications. The Stirling engine also has the potential to meet DOE's performance and cost goals. The NASA Lewis Research Center is conducting Stirling engine technology development activities directed toward a dynamic power source for space applications. Space power systems requirements include high reliability, very long life, low vibration and high efficiency. The free-piston Stirling engine has the potential for future high power space conversion systems, either nuclear or solar powered. Although both applications appear to be quite different, their requirements complement each other. Preliminary designs feature a free-piston Stirling engine, a liquid metal heat transport system, and a means to provide nominally 25 kW electric power to a utility grid while meeting DOE's performance and long term cost goals. The Cummins design incorporates a linear alternator to provide the electrical output, while the STC design generates electrical power indirectly through a hydraulic pump/motor coupled to an induction generator. Both designs for the ASCS's will use technology which can reasonably be expected to be available in the early 1990's.

  2. Preliminary designs for 25 kWe advanced Stirling conversion systems for dish electric applications

    NASA Astrophysics Data System (ADS)

    Shaltens, Richard K.; Schreiber, Jeffrey G.

    Under the Department of Energy's (DOE) Solar Thermal Technology Program, Sandia National Laboratories is evaluating heat engines for terrestrial Solar Distributed Heat Receivers. The Stirling engine has been identified by Sandia as one of the most promising engines for terrestrial applications. The Stirling engine also has the potential to meet DOE's performance and cost goals. The NASA Lewis Research Center is conducting Stirling engine technology development activities directed toward a dynamic power source for space applications. Space power systems requirements include high reliability, very long life, low vibration and high efficiency. The free-piston Stirling engine has the potential for future high power space conversion systems, either nuclear or solar powered. Although both applications appear to be quite different, their requirements complement each other. Preliminary designs feature a free-piston Stirling engine, a liquid metal heat transport system, and a means to provide nominally 25 kW electric power to a utility grid while meeting DOE's performance and long term cost goals. The Cummins design incorporates a linear alternator to provide the electrical output, while the STC design generates electrical power indirectly through a hydraulic pump/motor coupled to an induction generator. Both designs for the ASCS's will use technology which can reasonably be expected to be available in the early 1990's.

  3. Preliminary designs for 25 kWe advanced Stirling conversion systems for dish electric applications

    NASA Technical Reports Server (NTRS)

    Shaltens, Richard K.; Schreiber, Jeffrey G.

    1990-01-01

    Under the Department of Energy's (DOE) Solar Thermal Technology Program, Sandia National Laboratories is evaluating heat engines for terrestrial Solar Distributed Heat Receivers. The Stirling engine has been identified by Sandia as one of the most promising engines for terrestrial applications. The Stirling engine also has the potential to meet DOE's performance and cost goals. The NASA Lewis Research Center is conducting Stirling engine technology development activities directed toward a dynamic power source for space applications. Space power systems requirements include high reliability, very long life, low vibration and high efficiency. The free-piston Stirling engine has the potential for future high power space conversion systems, either nuclear or solar powered. Although both applications appear to be quite different, their requirements complement each other. Preliminary designs feature a free-piston Stirling engine, a liquid metal heat transport system, and a means to provide nominally 25 kW electric power to a utility grid while meeting DOE's performance and long term cost goals. The Cummins design incorporates a linear alternator to provide the electrical output, while the STC design generates electrical power indirectly through a hydraulic pump/motor coupled to an induction generator. Both designs for the ASCS's will use technology which can reasonably be expected to be available in the early 1990's

  4. 75 FR 12737 - Applications To Export Electric Energy; Noble Energy Marketing and Trade Corp.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-17

    ...; Noble Energy Marketing and Trade Corp. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Under two separate applications, Noble Energy Marketing... power marketing agencies, and other entities within the United States. NEMT has requested electricity...

  5. Power system characteristics for more electric aircraft

    NASA Technical Reports Server (NTRS)

    Hansen, Irving G.

    1993-01-01

    It should not be suprising that more electric aircraft must meet significantly more difficult electrical power system requirements than were considereed when today's power distribution systems were being developed. Electric power, no longer a secondary system, will become a critical element of the primary control system. Functional reliability requiirements will be extremely stringent and can only be met by controlling element redundancy within a distributed power system. Existing electrical systems were not developed to have both the power system and the control/sensing elements distributed and yet meet the requirements of lighting tolerance and high intensity radio frequency (HIRF). In addition, the operation of electric actuators involves high transient loading and reverse energy flows. Such phenomena were also not anticipated when power quality was specified for either 270 vdc or 400 Hertz ac power systems. This paper will expand upon the issues and discuss some of the technologies involved in their resolution.

  6. National Wind Technology Center Dynamic 5-Megawatt Dynamometer

    ScienceCinema

    Felker, Fort

    2018-06-06

    The National Wind Technology Center (NWTC) offers wind industry engineers a unique opportunity to conduct a wide range of tests. Its custom-designed dynamometers can test wind turbine systems from 1 kilowatt (kW) to 5 megawatts (MW). The NWTC's new dynamometer facility simulates operating field conditions to assess the reliability and performance of wind turbine prototypes and commercial machines, thereby reducing deployment time, failures, and maintenance or replacement costs. Funded by the U.S. Department of Energy with American Recovery and Reinvestment Act (ARRA) funds, the 5-MW dynamometer will provide the ability to test wind turbine drivetrains and connect those drivetrains directly to the electricity grid or through a controllable grid interface (CGI). The CGI tests the low-voltage ride-through capability of a drivetrain as well as its response to faults and other abnormal grid conditions.

  7. Illinois high-speed rail four-quadrant gate reliability assessment

    DOT National Transportation Integrated Search

    2009-10-01

    The Federal Railroad Administration (FRA) tasked the John A. Volpe National Transportation Systems Center (Volpe Center) to conduct a reliability analysis of the four-quadrant gate/vehicle detection equipment installed on the future high-speed rail (...

  8. Power processing for electric propulsion

    NASA Technical Reports Server (NTRS)

    Finke, R. C.; Herron, B. G.; Gant, G. D.

    1975-01-01

    The inclusion of electric thruster systems in spacecraft design is considered. The propulsion requirements of such spacecraft dictate a wide range of thruster power levels and operational lifetimes, which must be matched by lightweight, efficient, and reliable thruster power processing systems. Electron bombardment ion thruster requirements are presented, and the performance characteristics of present power processing systems are reviewed. Design philosophies and alternatives in areas such as inverter type, arc protection, and control methods are discussed along with future performance potentials for meeting goals in the areas of power process or weight (10 kg/kW), efficiency (approaching 92 percent), reliability (0.96 for 15,000 hr), and thermal control capability (0.3 to 5 AU).

  9. Space Electric Research Test in the Electric Propulsion Laboratory

    NASA Image and Video Library

    1964-06-21

    Technicians prepare the Space Electric Research Test (SERT-I) payload for a test in Tank Number 5 of the Electric Propulsion Laboratory at the National Aeronautics and Space Administration (NASA) Lewis Research Center. Lewis researchers had been studying different methods of electric rocket propulsion since the mid-1950s. Harold Kaufman created the first successful engine, the electron bombardment ion engine, in the early 1960s. These electric engines created and accelerated small particles of propellant material to high exhaust velocities. Electric engines have a very small amount of thrust, but once lofted into orbit by workhorse chemical rockets, they are capable of small, continuous thrust for periods up to several years. The electron bombardment thruster operated at a 90-percent efficiency during testing in the Electric Propulsion Laboratory. The package was rapidly rotated in a vacuum to simulate its behavior in space. The SERT-I mission, launched from Wallops Island, Virginia, was the first flight test of Kaufman’s ion engine. SERT-I had one cesium engine and one mercury engine. The suborbital flight was only 50 minutes in duration but proved that the ion engine could operate in space. The Electric Propulsion Laboratory included two large space simulation chambers, one of which is seen here. Each uses twenty 2.6-foot diameter diffusion pumps, blowers, and roughing pumps to remove the air inside the tank to create the thin atmosphere. A helium refrigeration system simulates the cold temperatures of space.

  10. Examination of local and systemic in vivo responses to electrical injury using an electrical burn delivery system.

    PubMed

    Shupp, Jeffrey W; Moffatt, Lauren T; Nguyen, Thu; Ramella-Roman, Jessica C; Hammamieh, Rasha; Miller, Stacy-Ann; Leto, Ellen J; Jo, Daniel Y; Randad, Pranay R; Jett, Marti; Jeng, James C; Jordan, Marion H

    2012-01-01

    Electrical injuries are devastating and are difficult to manage due to the complexity of the tissue damage and physiological impacts. A paucity of literature exists which describes models for electrical injury. To date, those models have been used primarily to demonstrate thermal and morphological effects at the points of contact. Creating a more representative model for human injury and further elucidating the physics and pathophysiology of this unique form of tissue injury could be helpful in designing stage-appropriate therapy and improving limb salvage. An electrical burn delivery system was developed to accurately and reliably deliver electrical current at varying exposure times. A series of Sprague-Dawley rats were anesthetized and subjected to injury with 1000 V of direct current at incremental exposure times (2-20 seconds). Whole blood and plasma were obtained immediately before shock, immediately postinjury, and then hourly for 3 hours. Laser Doppler images of tissue adjacent to the entrance and exit wounds were obtained at the outlined time points to provide information on tissue perfusion. The electrical exposure was nonlethal in all animals. The size and the depth of contact injury increased in proportion to the exposure times and were reproducible. Skin adjacent to injury (both entrance and exit sites) exhibited marked edema within 30 minutes. In adjacent skin of upper extremity wounds, mean perfusion units increased immediately postinjury and then gradually decreased in proportion to the severity of the injuries. In the lower extremity, this phenomenon was only observed for short contact times, while longer contact times had marked malperfusion throughout. In the plasma, interleukin-10 and vascular endothelial growth factor levels were found to be augmented by injury. Systemic transcriptome analysis revealed promising information about signal networks involved in dermatological, connective tissue, and neurological pathophysiological processes. A

  11. U.S. power generation, water stress, and climate change: using science to understand "water-smart" electricity-sector decision making

    NASA Astrophysics Data System (ADS)

    Rogers, J. H.; Frumhoff, P. C.; Averyt, K.; Newmark, R. L.

    2012-12-01

    In 2011, nearly 90 percent of U.S. electricity came from thermoelectric (steam-producing) power plants that use water for cooling. These water demands can tax rivers and aquifers, threaten fish and wildlife, and spark conflicts between power plants and other water users. Climate change, driven by in large part by emissions from fossil fuel-based electricity generation, is adding to the strain. Higher temperatures raise electricity demand and lower cooling-system efficiency, while drought and changes in precipitation patterns may make freshwater supplies less reliable. Here we report new findings on the impacts, present and projected, of power-plant water use on local water stress across the United States, and its implications for understanding what constitutes "water-smart" energy decision making. This work was carried out under the auspices of the Energy and Water in a Warming World initiative (EW3), a research and outreach collaboration designed to inform and motivate U.S. public awareness and science-based public policy at the energy-water nexus. The research has involved cataloguing the water use characteristics of virtually every U.S. power generator in the nation to develop a robust assessment of the water resource implications of cooling the nation's power plants. By analyzing local water supply and demand conditions across the nation, we identified water basins where current power plant water use appears to contribute strongly to local water supply stress, and where water-intensive electricity choices could substantially exacerbate water stress. We also identified other potential approaches to considering stress, particularly related to water temperature. The research has also involved analyzing the water implications of different electricity pathways in the United States over the next 40 years. We used a high-resolution electricity model to generate a range of electricity mixes, particularly in the context of a carbon budget, and assessed the water

  12. Assessment of deep tissue hyperalgesia in the groin - a method comparison of electrical vs. pressure stimulation.

    PubMed

    Aasvang, E K; Werner, M U; Kehlet, H

    2014-09-01

    Deep pain complaints are more frequent than cutaneous in post-surgical patients, and a prevalent finding in quantitative sensory testing studies. However, the preferred assessment method - pressure algometry - is indirect and tissue unspecific, hindering advances in treatment and preventive strategies. Thus, there is a need for development of methods with direct stimulation of suspected hyperalgesic tissues to identify the peripheral origin of nociceptive input. We compared the reliability of an ultrasound-guided needle stimulation protocol of electrical detection and pain thresholds to pressure algometry, by performing identical test-retest sequences 10 days apart, in deep tissues in the groin region. Electrical stimulation was performed by five up-and-down staircase series of single impulses of 0.04 ms duration, starting from 0 mA in increments of 0.2 mA until a threshold was reached and descending until sensation was lost. Method reliability was assessed by Bland-Altman plots, descriptive statistics, coefficients of variance and intraclass correlation coefficients. The electrical stimulation method was comparable to pressure algometry regarding 10 days test-retest repeatability, but with superior same-day reliability for electrical stimulation (P < 0.05). Between-subject variance rather than within-subject variance was the main source for test variation. There were no systematic differences in electrical thresholds across tissues and locations (P > 0.05). The presented tissue-specific direct deep tissue electrical stimulation technique has equal or superior reliability compared with the indirect tissue-unspecific stimulation by pressure algometry. This method may facilitate advances in mechanism based preventive and treatment strategies in acute and chronic post-surgical pain states. © 2014 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.

  13. Performance and Reliability of Bonded Interfaces for High-Temperature Packaging; NREL (National Renewable Energy Laboratory)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DeVoto, Douglas

    2015-06-10

    This is a technical review of the DOE VTO EDT project EDT063, Performance and Reliability of Bonded Interfaces for High-Temperature Packaging. A procedure for analyzing the reliability of sintered-silver through experimental thermal cycling and crack propagation modeling has been outlined and results have been presented.

  14. Research on Relation between El Nino Climate and Summer Electricity Consumption

    NASA Astrophysics Data System (ADS)

    Miao, B.; Lin, J. Y.; Liu, C.

    2018-01-01

    El Nino is a typical climate phenomena. Such phenomena would have influence on climate in China and furthermore impact the electricity condition. This paper is purposed to explore how El Nino phenomena affecting electricity and make prediction on summer electricity consumption. Since meteorological characteristics are complex and multiplex, a variety of meteorological factors should be considered and the paper used Body Feeling Temperature to measure it. Furthermore, to make prediction on summer electricity, the paper used the Pearson Analysis to measure the correlation between weather and electricity and then extracted the weather-used electricity from the whole society electricity using least square method. Finally, the paper built the model on relation between weather-used electricity and body feeling temperature, and took Beijing as an example to make electricity prediction. The prediction idea and model the paper put forward is reliable and practicable.

  15. Renewable Electricity Futures Study. Volume 1: Exploration of High-Penetration Renewable Electricity Futures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mai, T.; Wiser, R.; Sandor, D.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a futuremore » through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).« less

  16. National audit of continence care: laying the foundation.

    PubMed

    Mian, Sarah; Wagg, Adrian; Irwin, Penny; Lowe, Derek; Potter, Jonathan; Pearson, Michael

    2005-12-01

    National audit provides a basis for establishing performance against national standards, benchmarking against other service providers and improving standards of care. For effective audit, clinical indicators are required that are valid, feasible to apply and reliable. This study describes the methods used to develop clinical indicators of continence care in preparation for a national audit. To describe the methods used to develop and test clinical indicators of continence care with regard to validity, feasibility and reliability. A multidisciplinary working group developed clinical indicators that measured the structure, process and outcome of care as well as case-mix variables. Literature searching, consensus workshops and a Delphi process were used to develop the indicators. The indicators were tested in 15 secondary care sites, 15 primary care sites and 15 long-term care settings. The process of development produced indicators that received a high degree of consensus within the Delphi process. Testing of the indicators demonstrated an internal reliability of 0.7 and an external reliability of 0.6. Data collection required significant investment in terms of staff time and training. The method used produced indicators that achieved a high degree of acceptance from health care professionals. The reliability of data collection was high for this audit and was similar to the level seen in other successful national audits. Data collection for the indicators was feasible to collect, however, issues of time and staffing were identified as limitations to such data collection. The study has described a systematic method for developing clinical indicators for national audit. The indicators proved robust and reliable in primary and secondary care as well as long-term care settings.

  17. A new lifetime estimation model for a quicker LED reliability prediction

    NASA Astrophysics Data System (ADS)

    Hamon, B. H.; Mendizabal, L.; Feuillet, G.; Gasse, A.; Bataillou, B.

    2014-09-01

    LED reliability and lifetime prediction is a key point for Solid State Lighting adoption. For this purpose, one hundred and fifty LEDs have been aged for a reliability analysis. LEDs have been grouped following nine current-temperature stress conditions. Stress driving current was fixed between 350mA and 1A and ambient temperature between 85C and 120°C. Using integrating sphere and I(V) measurements, a cross study of the evolution of electrical and optical characteristics has been done. Results show two main failure mechanisms regarding lumen maintenance. The first one is the typically observed lumen depreciation and the second one is a much more quicker depreciation related to an increase of the leakage and non radiative currents. Models of the typical lumen depreciation and leakage resistance depreciation have been made using electrical and optical measurements during the aging tests. The combination of those models allows a new method toward a quicker LED lifetime prediction. These two models have been used for lifetime predictions for LEDs.

  18. Renewable Electricity Futures Study. Volume 2. Renewable Electricity Generation and Storage Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Augustine, Chad; Bain, Richard; Chapman, Jamie

    2012-06-15

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a futuremore » through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%–90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT). Learn more at the RE Futures website. http://www.nrel.gov/analysis/re_futures/« less

  19. Validity and reliability of chronic tic disorder and obsessive-compulsive disorder diagnoses in the Swedish National Patient Register.

    PubMed

    Rück, Christian; Larsson, K Johan; Lind, Kristina; Perez-Vigil, Ana; Isomura, Kayoko; Sariaslan, Amir; Lichtenstein, Paul; Mataix-Cols, David

    2015-06-22

    The usefulness of cases diagnosed in administrative registers for research purposes is dependent on diagnostic validity. This study aimed to investigate the validity and inter-rater reliability of recorded diagnoses of tic disorders and obsessive-compulsive disorder (OCD) in the Swedish National Patient Register (NPR). Chart review of randomly selected register cases and controls. 100 tic disorder cases and 100 OCD cases were randomly selected from the NPR based on codes from the International Classification of Diseases (ICD) 8th, 9th and 10th editions, together with 50 epilepsy and 50 depression control cases. The obtained psychiatric records were blindly assessed by 2 senior psychiatrists according to the criteria of the fourth edition of the Diagnostic and Statistical Manual of Mental Disorders, Fourth Edition, Text Revision (DSM-IV-TR) and ICD-10. Positive predictive value (PPV; cases diagnosed correctly divided by the sum of true positives and false positives). Between 1969 and 2009, the NPR included 7286 tic disorder and 24,757 OCD cases. The vast majority (91.3% of tic cases and 80.1% of OCD cases) are coded with the most recent ICD version (ICD-10). For tic disorders, the PPV was high across all ICD versions (PPV=89% in ICD-8, 86% in ICD-9 and 97% in ICD-10). For OCD, only ICD-10 codes had high validity (PPV=91-96%). None of the epilepsy or depression control cases were wrongly diagnosed as having tic disorders or OCD, respectively. Inter-rater reliability was outstanding for both tic disorders (κ=1) and OCD (κ=0.98). The validity and reliability of ICD codes for tic disorders and OCD in the Swedish NPR is generally high. We propose simple algorithms to further increase the confidence in the validity of these codes for epidemiological research. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  20. Electricity pricing policy: A neo-institutional, developmental and cross-national policy design map

    NASA Astrophysics Data System (ADS)

    Koundinya, Sridarshan Umesh

    This dissertation explores the role of ideas and ideology in the mental policy design maps of regulators in the US and in India. The research approach is to describe the regulatory design process in the history of the US electric industry from a neo-institutional and developmental perspective. And then to use the insights of such a study to suggest policy options to a sample of Indian experts. A regulatory process model explores the interactions among normative values, regulatory instruments and historical phases in policy design. A spectrum of seven regulatory instruments--subsidized rates, average cost pricing, marginal cost pricing, time-of-use pricing, ramsey pricing, incentive regulation and spot pricing is examined. A neo-institutional perspective characterizes the process of institutionalizing these regulatory instruments as a design process that infuses them with values beyond mere technical requirements. The process model includes normative values such as efficiency, fairness, free choice and political feasibility. These values arise from an analytical classification of various market metaphors debated in the history of economic thought. The theory of development and co-evolution applied to the history of electricity regulation yields a typology of evolutionary phases in the US. The typology describes hierarchically emergent relationships between supply and demand and among the normative values. The theory hypothesizes technologically contingent relationships between pricing policies and normative values in the historical phases of dependence (or rural), independence (or urban) and interdependence (or informational). The contents of this model are represented as related elements in a policy design map that simplifies the process of designing regulatory instruments in the US. This neo-institutional, developmental policy design map was used to design a survey instrument. The survey was conducted among electricity experts in India to test the hypothesized

  1. The National Surgical Quality Improvement Program 30-Day Challenge: Microsurgical Breast Reconstruction Outcomes Reporting Reliability

    PubMed Central

    Chen, Austin D.; Kamali, Parisa; Chattha, Anmol S.; Bucknor, Alexandra; Cohen, Justin B.; Bletsis, Patrick P.; Flecha-Hirsch, Renata; Tobias, Adam M.; Lee, Bernard T.

    2018-01-01

    Background: The aim was to assess reliability of the American College of Surgeons National Surgical Quality Improvement Program (ACS-NSQIP) 30-day perioperative outcomes and complications for immediate, free-tissue transfer breast reconstruction by direct comparisons with our 30-day and overall institutional data, and assessing those that occur after 30 days. Methods: Data were retrieved for consecutive immediate, free-tissue transfer breast reconstruction patients from a single-institution database (2010–2015) and the ACS-NSQIP (2011–2014). Multiple logistic regressions were performed to compare adjusted outcomes between the 2 datasets. Results: For institutional versus ACS-NSQIP outcomes, there were no significant differences in surgical-site infection (SSI; 30-day, 3.6% versus 4.1%, P = 0.818; overall, 5.3% versus 4.1%, P = 0.198), wound disruption (WD; 30-day, 1.3% versus 1.5%, P = 0.526; overall, 2.3% versus 1.5%, P = 0.560), or unplanned readmission (URA; 30-day, 2.3% versus 3.3%, P = 0.714; overall, 4.6% versus 3.3%, P = 0.061). However, the ACS-NSQIP reported a significantly higher unplanned reoperation (URO) rate (30-day, 3.6% versus 9.5%, P < 0.001; overall, 5.3% versus 9.5%, P = 0.025). Institutional complications consisted of 5.3% SSI, 2.3% WD, 5.3% URO, and 4.6% URA, of which 25.0% SSI, 28.6% WD, 12.5% URO, and 7.1% URA occurred at 30–60 days, and 6.3% SSI, 14.3% WD, 18.8% URO, and 42.9% URA occurred after 60 days. Conclusion: For immediate, free-tissue breast reconstruction, the ACS-NSQIP may be reliable for monitoring and comparing SSI, WD, URO, and URA rates. However, clinicians may find it useful to understand limitations of the ACS-NSQIP for complications and risk factors, as it may underreport complications occurring beyond 30 days. PMID:29707443

  2. Reliability of analog quantum simulation

    NASA Astrophysics Data System (ADS)

    Sarovar, Mohan; Zhang, Jun; Zeng, Lishan

    Analog quantum simulators (AQS) will likely be the first nontrivial application of quantum technology for predictive simulation. However, there remain questions regarding the degree of confidence that can be placed in the results of AQS since they do not naturally incorporate error correction. We formalize the notion of AQS reliability to calibration errors by determining sensitivity of AQS outputs to underlying parameters, and formulate conditions for robust simulation. Our approach connects to the notion of parameter space compression in statistical physics and naturally reveals the importance of model symmetries in dictating the robust properties. This work was supported by the Laboratory Directed Research and Development program at Sandia National Laboratories. Sandia National Laboratories is a multi-mission laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the United States Department of Energy's National Nuclear Security Administration under Contract No. DE-AC04-94AL85000.

  3. Cost-effective solutions to maintaining smart grid reliability

    NASA Astrophysics Data System (ADS)

    Qin, Qiu

    As the aging power systems are increasingly working closer to the capacity and thermal limits, maintaining an sufficient reliability has been of great concern to the government agency, utility companies and users. This dissertation focuses on improving the reliability of transmission and distribution systems. Based on the wide area measurements, multiple model algorithms are developed to diagnose transmission line three-phase short to ground faults in the presence of protection misoperations. The multiple model algorithms utilize the electric network dynamics to provide prompt and reliable diagnosis outcomes. Computational complexity of the diagnosis algorithm is reduced by using a two-step heuristic. The multiple model algorithm is incorporated into a hybrid simulation framework, which consist of both continuous state simulation and discrete event simulation, to study the operation of transmission systems. With hybrid simulation, line switching strategy for enhancing the tolerance to protection misoperations is studied based on the concept of security index, which involves the faulted mode probability and stability coverage. Local measurements are used to track the generator state and faulty mode probabilities are calculated in the multiple model algorithms. FACTS devices are considered as controllers for the transmission system. The placement of FACTS devices into power systems is investigated with a criterion of maintaining a prescribed level of control reconfigurability. Control reconfigurability measures the small signal combined controllability and observability of a power system with an additional requirement on fault tolerance. For the distribution systems, a hierarchical framework, including a high level recloser allocation scheme and a low level recloser placement scheme, is presented. The impacts of recloser placement on the reliability indices is analyzed. Evaluation of reliability indices in the placement process is carried out via discrete event

  4. Biomass for Electricity Generation

    EIA Publications

    2002-01-01

    This paper examines issues affecting the uses of biomass for electricity generation. The methodology used in the National Energy Modeling System to account for various types of biomass is discussed, and the underlying assumptions are explained.

  5. Reliability of ionic polymer metallic composite for opto-mechanical applications

    NASA Astrophysics Data System (ADS)

    Yu, Chung-Yi; Su, Guo-Dung J.

    2014-09-01

    Electroactive polymer (EAP) is capable of exhibiting large shape changes in response to electrical stimulation. EAPs can produce large deformation with lower applied voltage for actuation applications. IPMC (Ionic Polymer Metal Composite) is a well-known ionic EAPs. It has numerous attractive advantages, such as low electrical energy consumption and light weight. The mechanism of IPMC actuator is due to the ionic diffusion when the voltage gradient is applied, so that the type of ionic solution has a large impact on the physical properties of IPMC. In this paper, the reliability tests of IPMC with non-aqueous ionic solution are demonstrated. Pt-IPMC with LiOH aqueous solution exhibits the best maximum displacement, but the water in LiOH solution is electrolyzed because of the low electrolysis voltage 1.23 V of water. To improve electrolysis problems and the operation time in the air, proper solvents including high electrolysis voltage and low vapor pressure should be considered. The reliability tests focus on the durability of IPMC in the air. The surface resistance, tip displacement and response time of IPMC are presented. More improvements of IPMC fabrication, such as Ag-IPMC, was developed in this paper.

  6. Teflon/SiO2 Bilayer Passivation for Improving the Electrical Reliability of Oxide TFTs Fabricated Using a New Two-Photomask Self-Alignment Process

    PubMed Central

    Fan, Ching-Lin; Shang, Ming-Chi; Li, Bo-Jyun; Lin, Yu-Zuo; Wang, Shea-Jue; Lee, Win-Der; Hung, Bohr-Ran

    2015-01-01

    This study proposes a two-photomask process for fabricating amorphous indium–gallium–zinc oxide (a-IGZO) thin-film transistors (TFTs) that exhibit a self-aligned structure. The fabricated TFTs, which lack etching-stop (ES) layers, have undamaged a-IGZO active layers that facilitate superior performance. In addition, we demonstrate a bilayer passivation method that uses a polytetrafluoroethylene (Teflon) and SiO2 combination layer for improving the electrical reliability of the fabricated TFTs. Teflon was deposited as a buffer layer through thermal evaporation. The Teflon layer exhibited favorable compatibility with the underlying IGZO channel layer and effectively protected the a-IGZO TFTs from plasma damage during SiO2 deposition, resulting in a negligible initial performance drop in the a-IGZO TFTs. Compared with passivation-free a-IGZO TFTs, passivated TFTs exhibited superior stability even after 168 h of aging under ambient air at 95% relative humidity. PMID:28788026

  7. 29 CFR 1926.97 - Electrical protective equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... glove. (2) Electrical requirements. (i) Equipment shall be capable of withstanding the ac proof-test voltage specified in Table E-1 or the dc proof-test voltage specified in Table E-2. (A) The proof test shall reliably indicate that the equipment can withstand the voltage involved. (B) The test voltage...

  8. Electrical Actuation Technology Bridging

    NASA Technical Reports Server (NTRS)

    Hammond, Monica (Compiler); Sharkey, John (Compiler)

    1993-01-01

    This document contains the proceedings of the NASA Electrical Actuation Technology Bridging (ELA-TB) Workshop held in Huntsville, Alabama, September 29-October 1, 1992. The workshop was sponsored by the NASA Office of Space Systems Development and Marshall Space Flight Center (MSFC). The workshop addressed key technologies bridging the entire field of electrical actuation including systems methodology, control electronics, power source systems, reliability, maintainability, and vehicle health management with special emphasis on thrust vector control (TVC) applications on NASA launch vehicles. Speakers were drawn primarily from industry with participation from universities and government. In addition, prototype hardware demonstrations were held at the MSFC Propulsion Laboratory each afternoon. Splinter sessions held on the final day afforded the opportunity to discuss key issues and to provide overall recommendations. Presentations are included in this document.

  9. Electrical Actuation Technology Bridging

    NASA Astrophysics Data System (ADS)

    Hammond, Monica; Sharkey, John

    1993-05-01

    This document contains the proceedings of the NASA Electrical Actuation Technology Bridging (ELA-TB) Workshop held in Huntsville, Alabama, September 29-October 1, 1992. The workshop was sponsored by the NASA Office of Space Systems Development and Marshall Space Flight Center (MSFC). The workshop addressed key technologies bridging the entire field of electrical actuation including systems methodology, control electronics, power source systems, reliability, maintainability, and vehicle health management with special emphasis on thrust vector control (TVC) applications on NASA launch vehicles. Speakers were drawn primarily from industry with participation from universities and government. In addition, prototype hardware demonstrations were held at the MSFC Propulsion Laboratory each afternoon. Splinter sessions held on the final day afforded the opportunity to discuss key issues and to provide overall recommendations. Presentations are included in this document.

  10. Electrical impedance myography in facioscapulohumeral muscular dystrophy.

    PubMed

    Statland, Jeffrey M; Heatwole, Chad; Eichinger, Katy; Dilek, Nuran; Martens, William B; Tawil, Rabi

    2016-10-01

    In this study we determined the reliability and validity of electrical impedance myography (EIM) in facioscapulohumeral muscular dystrophy (FSHD). We performed a prospective study of EIM on 16 bilateral limb and trunk muscles in 35 genetically defined and clinically affected FSHD patients (reliability testing on 18 patients). Summary scores based on body region were derived. Reactance and phase (50 and 100 kHz) were compared with measures of strength, FSHD disease severity, and functional outcomes. Participants were mostly men, mean age 53.0 years, and included a full range of severity. Limb and trunk muscles showed good to excellent reliability [intraclass correlation coefficients (ICC) 0.72-0.99]. Summary scores for the arm, leg, and trunk showed excellent reliability (ICC 0.89-0.98). Reactance was the most sensitive EIM parameter to a broad range of FSHD disease metrics. EIM is a reliable measure of muscle composition in FSHD that offers the possibility to serially evaluate affected muscles. Muscle Nerve 54: 696-701, 2016. © 2016 Wiley Periodicals, Inc.

  11. Electric Power Monthly, August 1990. [Glossary included

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-11-29

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national, Census division, and State level. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data includes generation by energy source (coal, oil, gas, hydroelectric, and nuclear); generation by region; consumption of fossil fuels for power generation; sales of electric power, cost data; and unusual occurrences. A glossary is included.

  12. 75 FR 57911 - Application To Export Electric Energy; GDF SUEZ Energy Marketing NA, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... Marketing NA, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: GDF SUEZ Energy Marketing NA, Inc. (GSEMNA) has applied for authority to transmit... purchased from electric utilities, Federal power marketing agencies and other entities within the United...

  13. 2000 national fire plan and its ramifications for wood supply from western national forests

    Treesearch

    Henry Spelter; Peter Ince

    2001-01-01

    Will the National Forests become a more reliable supplier of timber again in conjunction with the National Fire Plan? The National Forests represent a major potential source of wood fiber in the West. They occupy 48% of the commercial forestland, hold 63% of the region?s softwood growing stock, and contribute 48% of its net annual growth. But in California, Idaho,...

  14. Qualification Users' Perceptions and Experiences of Assessment Reliability

    ERIC Educational Resources Information Center

    Chamberlain, Suzanne

    2013-01-01

    This paper presents the findings of a study designed to explore qualification users' perceptions and experiences of reliability in the context of national assessment outcomes in England. The study consisted of 17 focus groups conducted across six sectors of qualification users: students, teachers, trainee teachers, job-seekers, employers and…

  15. Low-Cost, Robust, Threat-Aware Wireless Sensor Network for Assuring the Nation's Energy Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carols H. Rentel

    2007-03-31

    Eaton, in partnership with Oak Ridge National Laboratory and the Electric Power Research Institute (EPRI) has completed a project that applies a combination of wireless sensor network (WSN) technology, anticipatory theory, and a near-term value proposition based on diagnostics and process uptime to ensure the security and reliability of critical electrical power infrastructure. Representatives of several Eaton business units have been engaged to ensure a viable commercialization plan. Tennessee Valley Authority (TVA), American Electric Power (AEP), PEPCO, and Commonwealth Edison were recruited as partners to confirm and refine the requirements definition from the perspective of the utilities that actually operatemore » the facilities to be protected. Those utilities have cooperated with on-site field tests as the project proceeds. Accomplishments of this project included: (1) the design, modeling, and simulation of the anticipatory wireless sensor network (A-WSN) that will be used to gather field information for the anticipatory application, (2) the design and implementation of hardware and software prototypes for laboratory and field experimentation, (3) stack and application integration, (4) develop installation and test plan, and (5) refinement of the commercialization plan.« less

  16. Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olszewski, M.

    efficiency and performance targets at the vehicle level have been achieved. The research performed under this subprogram will help remove technical and cost barriers to enable the development of technology for use in such advanced vehicles as hybrid electric vehicles (HEVs), plug-in HEVs, and fuel-cell-powered automobiles that meet the goals of the Vehicle Technologies Program. A key element in making HEVs practical is providing an affordable electric traction drive system. This will require attaining weight, volume, and cost targets for the power electronics and electrical machines subsystems of the traction drive system. Areas of development include these: (1) novel traction motor designs that result in increased power density and lower cost; (2) inverter technologies involving new topologies to achieve higher efficiency and the ability to accommodate higher-temperature environments; (3) converter concepts that employ means of reducing the component count and integrating functionality to decrease size, weight, and cost; (4) more effective thermal control and packaging technologies; and (5) integrated motor/inverter concepts. The Oak Ridge National Laboratory's (ORNL's) Power Electronics and Electric Machinery Research Center conducts fundamental research, evaluates hardware, and assists in the technical direction of the DOE Vehicle Technologies Program, APEEM subprogram. In this role, ORNL serves on the FreedomCAR Electrical and Electronics Technical Team, evaluates proposals for DOE, and lends its technological expertise to the direction of projects and evaluation of developing technologies.« less

  17. Perspectives on the future of the electric utility industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tonn, B.; Schaffhauser, A.

    1994-04-01

    This report offers perspectives on the future of the electric utility industry. These perspectives will be used in further research to assess the prospects for Integrated Resource Planning (IRP). The perspectives are developed first by examining economic, political and regulatory, societal, technological, and environmental trends that are (1) national and global in scope and (2) directly related to the electric utility industry. Major national and global trends include increasing global economic competition, increasing political and ethnic strife, rapidly changing technologies, and increasing worldwide concern about the environment. Major trends in the utility industry include increasing competition in generation; changing patternsmore » of electricity demand; increasing use of information technology to control power systems; and increasing implementation of environmental controls. Ways in which the national and global trends may directly affect the utility industry are also explored. The trends are used to construct three global and national scenarios- ``business as usual,`` ``technotopia future,`` and ``fortress state`` -and three electric utility scenarios- ``frozen in headlights,`` ``megaelectric,`` and ``discomania.`` The scenarios are designed to be thought provoking descriptions of potential futures, not predictions of the future, although three key variables are identified that will have significant impacts on which future evolves-global climate change, utility technologies, and competition. While emphasis needs to be placed on understanding the electric utility scenarios, the interactions between the two sets of scenarios is also of interest.« less

  18. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Milligan, M.; Ela, E.; Hein, J.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a futuremore » through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).« less

  19. Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Gujarat

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, Jaquelin M; Palchak, Joseph D; Ehlen, Annaliese K

    This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plantsmore » for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'« less

  20. Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Rajasthan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, Jaquelin M; Palchak, Joseph D; Ehlen, Annaliese K

    This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plantsmore » for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'« less

  1. Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Karnataka

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, Jaquelin M; Palchak, Joseph D; Ehlen, Annaliese K

    This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plantsmore » for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'« less

  2. Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Maharashtra

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, Jaquelin M; Palchak, Joseph D; Ehlen, Annaliese K

    This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plantsmore » for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'« less

  3. Small space station electrical power system design concepts

    NASA Technical Reports Server (NTRS)

    Jones, G. M.; Mercer, L. N.

    1976-01-01

    A small manned facility, i.e., a small space station, placed in earth orbit by the Shuttle transportation system would be a viable, cost effective addition to the basic Shuttle system to provide many opportunities for R&D programs, particularly in the area of earth applications. The small space station would have many similarities with Skylab. This paper presents design concepts for an electrical power system (EPS) for the small space station based on Skylab experience, in-house work at Marshall Space Flight Center, SEPS (Solar Electric Propulsion Stage) solar array development studies, and other studies sponsored by MSFC. The proposed EPS would be a solar array/secondary battery system. Design concepts expressed are based on maximizing system efficiency and five year operational reliability. Cost, weight, volume, and complexity considerations are inherent in the concepts presented. A small space station EPS based on these concepts would be highly efficient, reliable, and relatively inexpensive.

  4. Renewable Electricity Futures Study. Volume 1. Exploration of High-Penetration Renewable Electricity Futures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hand, M. M.; Baldwin, S.; DeMeo, E.

    2012-06-15

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a futuremore » through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%–90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT). Learn more at the RE Futures website. http://www.nrel.gov/analysis/re_futures/« less

  5. 75 FR 78979 - Application to Export Electric Energy; Twin Rivers Paper Company Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    .... Twin Rivers has requested an export authorization in order to be able to supply emergency power as... proposed action will not adversely impact on the reliability of the U.S. electric power supply system... electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act. DATES...

  6. Reliability and quality EEE parts issues

    NASA Technical Reports Server (NTRS)

    Barney, Dan; Feigenbaum, Irwin

    1990-01-01

    NASA policy and procedures are established which govern the selection, testing, and application of electrical, electronic, and electromechanical (EEE) parts. Recent advances in the state-of-the-art of electronic parts and associated technologies can significantly impact the electronic designs and reliability of NASA space transportation avionics. Significant issues that result from these advances are examined, including: recent advances in microelectronics technology (as applied to or considered for use in NASA projects); electron packaging technology advances (concurrent with, and as a result of, the development of the advanced microelectronic devices); availability of parts used in space avionics; and standardization and integration of parts activities between projects, centers, and contractors.

  7. The Development of a Highly Reliable Power Management and Distribution System for Civil Transport Aircraft

    NASA Technical Reports Server (NTRS)

    Coleman, Anthony S.; Hansen, Irving G.

    1994-01-01

    NASA is pursuing a program in Advanced Subsonic Transport (AST) to develop the technology for a highly reliable Fly-By-Light/Power-By-WIre aircraft. One of the primary objectives of the program is to develop the technology base for confident application of integrated PBW components and systems to transport aircraft to improve operating reliability and efficiency. Technology will be developed so that the present hydraulic and pneumatic systems of the aircraft can be systematically eliminated and replaced by electrical systems. These motor driven actuators would move the aircraft wing surfaces as well as the rudder to provide steering controls for the pilot. Existing aircraft electrical systems are not flight critical and are prone to failure due to Electromagnetic Interference (EMI) (1), ground faults and component failures. In order to successfully implement electromechanical flight control actuation, a Power Management and Distribution (PMAD) System must be designed having a reliability of 1 failure in 10(exp +9) hours, EMI hardening and a fault tolerance architecture to ensure uninterrupted power to all aircraft flight critical systems. The focus of this paper is to analyze, define, and describe technically challenging areas associated with the development of a Power By Wire Aircraft and typical requirements to be established at the box level. The authors will attempt to propose areas of investigation, citing specific military standards and requirements that need to be revised to accommodate the 'More Electric Aircraft Systems'.

  8. Linking Electricity for Peace: A Compelling Global Strategy.

    ERIC Educational Resources Information Center

    Meisen, Peter

    1997-01-01

    Comparative trend analysis shows striking improvements in all major societal indicators as electricity becomes available to developing nations. Discusses the linking of electrical grids between countries and across continents and the ramifications for standards of living, sustainable development, and world peace. (PVD)

  9. Overcoming the Adoption Barrier to Electric Flight

    NASA Technical Reports Server (NTRS)

    Borer, Nicholas K.; Nickol, Craig L.; Jones, Frank P.; Yasky, Richard J.; Woodham, Kurt; Fell, Jared S.; Litherland, Brandon L.; Loyselle, Patricia L.; Provenza, Andrew J.; Kohlman, Lee W.; hide

    2016-01-01

    Electrically-powered aircraft can enable dramatic increases in efficiency and reliability, reduced emissions, and reduced noise as compared to today's combustion-powered aircraft. This paper describes a novel flight demonstration concept that will enable the benefits of electric propulsion, while keeping the extraordinary convenience and utility of common fuels available at today's airports. A critical gap in airborne electric propulsion research is addressed by accommodating adoption at the integrated aircraft-airport systems level, using a confluence of innovative but proven concepts and technologies in power generation and electricity storage that need to reside only on the airframe. Technical discriminators of this demonstrator concept include (1) a novel, high-efficiency power system that utilizes advanced solid oxide fuel cells originally developed for ultra-long-endurance aircraft, coupled with (2) a high-efficiency, high-power electric propulsion system selected from mature products to reduce technical risk, assembled into (3) a modern, high-performance demonstration platform to provide useful and compelling data, both for the targeted early adopters and the eventual commercial market.

  10. FY2014 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Motors Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ozpineci, Burak

    The US Department of Energy (DOE) announced in May 2011 a new cooperative research effort comprising DOE, the US Council for Automotive Research (composed of automakers Ford Motor Company, General Motors Company, and Chrysler Group), Tesla Motors, and representatives of the electric utility and petroleum industries. Known as U.S. DRIVE (Driving Research and Innovation for Vehicle efficiency and Energy sustainability), it represents DOE’s commitment to developing public–private partnerships to fund high-risk–high-reward research into advanced automotive technologies. The new partnership replaces and builds upon the partnership known as FreedomCAR (derived from “Freedom” and “Cooperative Automotive Research”) that ran from 2002 throughmore » 2010 and the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. Oak Ridge National Laboratory’s (ORNL’s) Advanced Power Electronics and Electric Motors (APEEM) subprogram within the DOE Vehicle Technologies Office (VTO) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE), electric motor, and traction drive system (TDS) technologies that will leapfrog current on-the-road technologies, leading to lower cost and better efficiency in transforming battery energy to useful work. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow’s automobiles will function as a unified system to improve fuel efficiency through research in more efficient TDSs.« less

  11. The Science Camp Model based on maker movement and tinkering activity for developing concept of electricity in middle school students to meet standard evaluation of ordinary national educational test (O-NET)

    NASA Astrophysics Data System (ADS)

    Chamrat, Suthida

    2018-01-01

    The standard evaluation of Thai education relies excessively on the Ordinary National Educational Test, widely known as O-NET. However, a focus on O-Net results can lead to unsatisfactory teaching practices, especially in science subjects. Among the negative consequences, is that schools frequently engage in "cramming" practices in order to elevate their O-NET scores. Higher education, which is committed to generating and applying knowledge by socially engaged scholars, needs to take account of this situation. This research article portrays the collaboration between the faculty of education at Chiang Mai University and an educational service area to develop the model of science camp. The activities designed for the Science Camp Model were based on the Tinkering and Maker Movement. Specifically, the Science Camp Model was designed to enhance the conceptualization of electricity for Middle School Students in order to meet the standard evaluation of the Ordinary National Educational Test. The hands-on activities consisted of 5 modules which were simple electrical circuits, paper circuits, electrical measurement roleplay motor art robots and Force from Motor. The data were collected by 11 items of Electricity Socratic-based Test adapted from cumulative published O-NET tests focused on the concept of electricity concept. The qualitative data were also collected virtually via Flinga.com. The results indicated that students after participating in 5modules of science camp based on the Maker Movement and tinkering activity developed average percentage of test scores from 33.64 to 65.45. Gain score analysis using dependent t-test compared pretest and posttest mean scores. The p value was found to be statistically significant (less than 0.001). The posttest had a considerably higher mean score compared with the pretest. Qualitative data also indicated that students could explain the main concepts of electrical circuits, and the transformation of electrical energy to

  12. An Analytical Performance Assessment of a Fuel Cell-powered, Small Electric Airplane

    NASA Technical Reports Server (NTRS)

    Berton, Jeffrey J.; Freeh, Joshua E.; Wickenheiser, Timothy J.

    2003-01-01

    Rapidly emerging fuel cell power technologies may be used to launch a new revolution of electric propulsion systems for light aircraft. Future small electric airplanes using fuel cell technologies hold the promise of high reliability, low maintenance, low noise, and with exception of water vapor zero emissions. This paper describes an analytical feasibility and performance assessment conducted by NASA's Glenn Research Center of a fuel cell-powered, propeller-driven, small electric airplane based on a model of the MCR 01 two-place kitplane.

  13. Battery capacity and recharging needs for electric buses in city transit service

    DOE PAGES

    Gao, Zhiming; Lin, Zhenhong; LaClair, Tim J.; ...

    2017-01-27

    Our paper evaluates the energy consumption and battery performance of city transit electric buses operating on real day-to-day routes and standardized bus drive cycles, based on a developed framework tool that links bus electrification feasibility with real-world vehicle performance, city transit bus service reliability, battery sizing and charging infrastructure. The impacts of battery capacity combined with regular and ultrafast charging over different routes have been analyzed in terms of the ability to maintain city transit bus service reliability like conventional buses. These results show that ultrafast charging via frequent short-time boost charging events, for example at a designated bus stopmore » after completing each circuit of an assigned route, can play a significant role in reducing the battery size and can eliminate the need for longer duration charging events that would cause schedule delays. Furthermore, the analysis presented shows that significant benefits can be realized by employing multiple battery configurations and flexible battery swapping practices in electric buses. These flexible design and use options will allow electric buses to service routes of varying city driving patterns and can therefore enable meaningful reductions to the cost of the vehicle and battery while ensuring service that is as reliable as conventional buses.« less

  14. Battery capacity and recharging needs for electric buses in city transit service

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gao, Zhiming; Lin, Zhenhong; LaClair, Tim J.

    Our paper evaluates the energy consumption and battery performance of city transit electric buses operating on real day-to-day routes and standardized bus drive cycles, based on a developed framework tool that links bus electrification feasibility with real-world vehicle performance, city transit bus service reliability, battery sizing and charging infrastructure. The impacts of battery capacity combined with regular and ultrafast charging over different routes have been analyzed in terms of the ability to maintain city transit bus service reliability like conventional buses. These results show that ultrafast charging via frequent short-time boost charging events, for example at a designated bus stopmore » after completing each circuit of an assigned route, can play a significant role in reducing the battery size and can eliminate the need for longer duration charging events that would cause schedule delays. Furthermore, the analysis presented shows that significant benefits can be realized by employing multiple battery configurations and flexible battery swapping practices in electric buses. These flexible design and use options will allow electric buses to service routes of varying city driving patterns and can therefore enable meaningful reductions to the cost of the vehicle and battery while ensuring service that is as reliable as conventional buses.« less

  15. Wide-area situation awareness in electric power grid

    NASA Astrophysics Data System (ADS)

    Greitzer, Frank L.

    2010-04-01

    Two primary elements of the US energy policy are demand management and efficiency and renewable sources. Major objectives are clean energy transmission and integration, reliable energy transmission, and grid cyber security. Development of the Smart Grid seeks to achieve these goals by lowering energy costs for consumers, achieving energy independence and reducing greenhouse gas emissions. The Smart Grid is expected to enable real time wide-area situation awareness (SA) for operators. Requirements for wide-area SA have been identified among interoperability standards proposed by the Federal Energy Regulatory Commission and the National Institute of Standards and Technology to ensure smart-grid functionality. Wide-area SA and enhanced decision support and visualization tools are key elements in the transformation to the Smart Grid. This paper discusses human factors research to promote SA in the electric power grid and the Smart Grid. Topics that will be discussed include the role of human factors in meeting US energy policy goals, the impact and challenges for Smart Grid development, and cyber security challenges.

  16. Identification of potential locations of electric vehicle supply equipment

    NASA Astrophysics Data System (ADS)

    Brooker, R. Paul; Qin, Nan

    2015-12-01

    Proper placement of electric vehicle supply equipment (charging stations) requires an understanding of vehicle usage patterns. Using data from the National Household Travel Survey on vehicle mileage and destination patterns, analyses were performed to determine electric vehicles' charging needs, as a function of battery size and state of charge. This paper compares electric vehicle charging needs with Department of Energy electric vehicle charging data from real-world charging infrastructure. By combining the electric vehicles charging needs with charging data from real-world applications, locations with high electric vehicle charging likelihood are identified.

  17. Electric Field Distribution in High Voltage Power Modules Using Finite Element Simulations

    NASA Astrophysics Data System (ADS)

    Wang, Zhao; Liu, Yaoning

    2018-03-01

    With the development of the high voltage insulated gate bipolar transistor (IGBT) power module, it leads to serious problems concerning the electric field insulation. The electric field capabilities of the silicone gels used in the power module encapsulation directly affect the module insulation. Some solutions have been developed to optimize the electric field and reliability. In this letter, the finite element simulation was used to analyze and localize the maximum electric field position; solutions were proposed to improve the module insulation. It’s demonstrated that BaTiO3 silicone composite is a promising insulation material for high voltage power device.

  18. Energy and Environment Guide to Action - Chapter 7: Electric Utility Policies

    EPA Pesticide Factsheets

    Focuses on the authorites that state legislatures have granted to PUCs to regulate electricity and reliability, as these authorities directly affect utilities' and customers' investments in energy efficiency, renewable energy, and CHP.

  19. 75 FR 35021 - Reliability Standards Development and NERC and Regional Entity Enforcement; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... Standards Development and NERC and Regional Entity Enforcement; Notice of Technical Conference June 15, 2010... Technical Conference to address industry perspectives on certain issues pertaining to the development and... Electric Reliability Organization's (ERO) standards development process; communication and interactions...

  20. A high voltage electrical power system for low Earth orbit applications

    NASA Technical Reports Server (NTRS)

    Lanier, J. R., Jr.; Bush, J. R., Jr.

    1984-01-01

    The results of testing a high voltage electrical power system (EPS) breadboard using high voltage power processing equipment developed at Marshall Space Flight Center and Ni-Cd batteries are discussed. These test results are used to extrapolate to an efficient, reliable, high capacity EPS for near term low Earth orbit, high power applications. EPS efficiencies, figures of merit, and battery reliability with a battery protection and reconditioning circuit are presented.