Sample records for near-term operating licenses

  1. 47 CFR 13.15 - License term.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false License term. 13.15 Section 13.15 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.15 License term. (a) First Class Radiotelegraph Operator's Certificates, Second Class Radiotelegraph Operator's...

  2. 14 CFR 420.45 - Transfer of a license to operate a launch site.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Transfer of a license to operate a launch site. 420.45 Section 420.45 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and...

  3. 14 CFR 420.45 - Transfer of a license to operate a launch site.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Transfer of a license to operate a launch site. 420.45 Section 420.45 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and...

  4. 47 CFR 87.27 - License term.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false License term. 87.27 Section 87.27 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.27 License term. (a) Licenses for stations in the aviation services will...

  5. 47 CFR 87.27 - License term.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false License term. 87.27 Section 87.27 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.27 License term. (a) Licenses for stations in the aviation services will...

  6. 47 CFR 101.526 - License term.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false License term. 101.526 Section 101.526 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.526 License term. The license term for...

  7. 15 CFR 960.9 - License term.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.9 License term. (a) Each license for... licensee to: (1) Provide data to the National Satellite Land Remote Sensing Data Archive for the basic data set; (2) Make data available to the National Satellite Land Remote Sensing Data Archive that the...

  8. 47 CFR 27.1212 - License term.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false License term. 27.1212 Section 27.1212 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Broadband Radio Service and Educational Broadband Service § 27.1212 License term. (a) BRS...

  9. 47 CFR 27.1212 - License term.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false License term. 27.1212 Section 27.1212 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Broadband Radio Service and Educational Broadband Service § 27.1212 License term. (a) BRS...

  10. 47 CFR 27.1212 - License term.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false License term. 27.1212 Section 27.1212 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Broadband Radio Service and Educational Broadband Service § 27.1212 License term. (a) BRS...

  11. 47 CFR 27.1212 - License term.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false License term. 27.1212 Section 27.1212 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Broadband Radio Service and Educational Broadband Service § 27.1212 License term. (a) BRS...

  12. 47 CFR 27.1212 - License term.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false License term. 27.1212 Section 27.1212 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Broadband Radio Service and Educational Broadband Service § 27.1212 License term. (a) BRS...

  13. 47 CFR 90.149 - License term.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false License term. 90.149 Section 90.149 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Applications and Authorizations § 90.149 License term. (a) Except as provided in...

  14. 47 CFR 90.1311 - License term.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false License term. 90.1311 Section 90.1311 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Wireless Broadband Services in the 3650-3700 MHz Band § 90.1311 License term. The...

  15. 47 CFR 90.1311 - License term.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false License term. 90.1311 Section 90.1311 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Wireless Broadband Services in the 3650-3700 MHz Band § 90.1311 License term. The...

  16. 47 CFR 1.85 - Suspension of operator licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... license is ordered suspended, the operator shall send his operator license to the Licensing and Technical Analysis Branch, Public Safety and Private Wireless Division, Wireless Telecommunications Bureau, in...

  17. 47 CFR 1.85 - Suspension of operator licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... license is ordered suspended, the operator shall send his operator license to the Licensing and Technical Analysis Branch, Public Safety and Private Wireless Division, Wireless Telecommunications Bureau, in...

  18. 47 CFR 101.1413 - License term and renewal expectancy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GHz Band § 101.1413 License term and renewal expectancy. (a) The MVDDS license term is ten years... on a showing of substantial service at the end of five years into the license period and ten years... end of five years into the license term and ten years into the license period, the Commission will...

  19. 48 CFR 252.227-7005 - License term.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government under this license. [56 FR 36479, July 31, 1991, as amended at 66 FR 49861, Oct. 1, 2001] ... patent releases, license agreements, and assignments: License Term (OCT 2001) Alternate I (AUG 1984). The... applications for patent referred to in such “License Grant” clause. Alternate II (OCT 2001). The license hereby...

  20. 48 CFR 252.227-7005 - License term.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Government under this license. [56 FR 36479, July 31, 1991, as amended at 66 FR 49861, Oct. 1, 2001] ... patent releases, license agreements, and assignments: License Term (OCT 2001) Alternate I (AUG 1984). The... applications for patent referred to in such “License Grant” clause. Alternate II (OCT 2001). The license hereby...

  1. 47 CFR 97.9 - Operator license grant.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... grants are: Novice, Technician, Technician Plus (until such licenses expire, a Technical Class license granted before February 14, 1991, is considered a Technician Plus Class license), General, Advanced, and... grant. (b) The person named in an operator license grant of Novice, Technician, Technician Plus, General...

  2. 47 CFR 13.7 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... are twelve types of commercial radio operator licenses, certificates and permits (licenses). The... Radiotelephone Operator License (radiotelephone operator's general certificate). (6) Marine Radio Operator Permit (radiotelephone operator's restricted certificate). (7) Restricted Radiotelephone Operator Permit (radiotelephone...

  3. 47 CFR 13.7 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... are twelve types of commercial radio operator licenses, certificates and permits (licenses). The... Radiotelephone Operator License (radiotelephone operator's general certificate). (6) Marine Radio Operator Permit (radiotelephone operator's restricted certificate). (7) Restricted Radiotelephone Operator Permit (radiotelephone...

  4. 14 CFR 415.11 - Additional license terms and conditions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Additional license terms and conditions. 415.11 Section 415.11 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH LICENSE General § 415.11 Additional license terms...

  5. 14 CFR 415.11 - Additional license terms and conditions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Additional license terms and conditions. 415.11 Section 415.11 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH LICENSE General § 415.11 Additional license terms...

  6. 47 CFR 87.87 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Classification of operator licenses and... § 87.87 Classification of operator licenses and endorsements. (a) Commercial radio operator licenses... Telecommunication Union. (b) The following licenses are issued by the Commission. International classification, if...

  7. 77 FR 70837 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations... Commission the authority to issue and make immediately effective any amendment to an operating license or... Docket ID NRC-2012-0283. You may submit comments by the following methods: Federal rulemaking Web site...

  8. 77 FR 35069 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations... Commission the authority to issue and make immediately effective any amendment to an operating license or... ID NRC-2012-0131. You may submit comments by the following methods: Federal Rulemaking Web site: Go...

  9. 47 CFR 1.83 - Applications for radio operator licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Applications for radio operator licenses. 1.83... Rules of Practice and Procedure Miscellaneous Proceedings § 1.83 Applications for radio operator licenses. (a) Application filing procedures for amateur radio operator licenses are set forth in part 97 of...

  10. 47 CFR 13.7 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... endorsements. 13.7 Section 13.7 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.7 Classification of operator licenses and endorsements. (a) Commercial radio operator... are eleven types of commercial radio operator licenses, certificates and permits (licenses). The...

  11. 47 CFR 13.7 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Classification of operator licenses and... OPERATORS General § 13.7 Classification of operator licenses and endorsements. (a) Commercial radio operator... license's ITU classification, if different from its name, is given in parentheses. (1) First Class...

  12. 14 CFR 431.11 - Additional license terms and conditions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Additional license terms and conditions. 431.11 Section 431.11 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION...) General § 431.11 Additional license terms and conditions. The FAA may amend an RLV mission license at any...

  13. 14 CFR 431.11 - Additional license terms and conditions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Additional license terms and conditions. 431.11 Section 431.11 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION...) General § 431.11 Additional license terms and conditions. The FAA may amend an RLV mission license at any...

  14. 14 CFR 431.11 - Additional license terms and conditions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Additional license terms and conditions. 431.11 Section 431.11 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION...) General § 431.11 Additional license terms and conditions. The FAA may amend an RLV mission license at any...

  15. 14 CFR 431.11 - Additional license terms and conditions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Additional license terms and conditions. 431.11 Section 431.11 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION...) General § 431.11 Additional license terms and conditions. The FAA may amend an RLV mission license at any...

  16. 14 CFR 431.11 - Additional license terms and conditions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Additional license terms and conditions. 431.11 Section 431.11 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION...) General § 431.11 Additional license terms and conditions. The FAA may amend an RLV mission license at any...

  17. 10 CFR 40.41 - Terms and conditions of licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Terms and conditions of licenses. 40.41 Section 40.41 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL Licenses § 40.41 Terms and... the regulations in this part shall confine his possession and use of source or byproduct material to...

  18. 47 CFR 13.5 - Licensed commercial radio operator required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Licensed commercial radio operator required. 13.5 Section 13.5 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.5 Licensed commercial radio operator required. Rules that require FCC station...

  19. 47 CFR 13.211 - Commercial radio operator license examination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commercial radio operator license examination. 13.211 Section 13.211 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS Examination System § 13.211 Commercial radio operator license examination. (a) Each session where...

  20. 47 CFR 13.5 - Licensed commercial radio operator required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Licensed commercial radio operator required. 13.5 Section 13.5 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.5 Licensed commercial radio operator required. Rules that require FCC station...

  1. 48 CFR 252.227-7007 - License term-running royalty.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false License term-running... of Provisions And Clauses 252.227-7007 License term—running royalty. As prescribed at 227.7009-4(b), insert the following clause in patent releases, license agreements, and assignments: License Term—Running...

  2. 48 CFR 252.227-7007 - License term-running royalty.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false License term-running... of Provisions And Clauses 252.227-7007 License term—running royalty. As prescribed at 227.7009-4(b), insert the following clause in patent releases, license agreements, and assignments: License Term—Running...

  3. 47 CFR 80.151 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Classification of operator licenses and... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements § 80.151 Classification of... following licenses are issued by the Commission. International classification, if different from the license...

  4. Site Operators License: Guidelines for Applicants

    DOT National Transportation Integrated Search

    1995-08-08

    The U. S. Department of Transportation's Office of Commercial Space : Transportation (OCST) issues site operator licenses based on the site : operator's demonstration of the ability to ensure public safety and the : safety of property, both on and of...

  5. Astrophysics science operations - Near-term plans and vision

    NASA Technical Reports Server (NTRS)

    Riegler, Guenter R.

    1991-01-01

    Astrophysics science operations planned by the Science Operations branch of NASA Astrophysics Division for the 1990s for the purpose of gathering spaceborne astronomical data are described. The paper describes the near-future plans of the Science Operations in the areas of the preparation of the proposal; the planning and execution of spaceborne observations; the collection, processing, and analysis data; and the dissemination of results. Also presented are concepts planned for introduction at the beginning of the 20th century, including the concepts of open communications, transparent instrument and observatory operations, a spiral requirements development method, and an automated research assistant.

  6. 47 CFR 13.7 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Classification of operator licenses and endorsements. 13.7 Section 13.7 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.7 Classification of operator licenses and endorsements. (a) Commercial radio operator...

  7. 77 FR 50584 - Voluntary Licensing of Amateur Rocket Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ...-0318; Amdt. No. 400-4] RIN 2120-AJ84 Voluntary Licensing of Amateur Rocket Operations AGENCY: Federal... amending the scope of its regulations to allow launch operators that conduct certain amateur rocket...\\ amateur rocket \\2\\ to voluntarily apply for a license or experimental permit under chapter III. Because...

  8. 47 CFR 80.25 - License term.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maritime services will normally be issued for a term of ten years from the date of original issuance, or... of ten years from the date of original issuance, major modification, or renewal. (c) Licenses for...

  9. 47 CFR 87.87 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... endorsements. 87.87 Section 87.87 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... § 87.87 Classification of operator licenses and endorsements. (a) Commercial radio operator licenses... restricted certificate) [53 FR 28940, Aug. 1, 1988, as amended at 78 FR 23158, Apr. 18, 2013] ...

  10. 47 CFR 87.87 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... endorsements. 87.87 Section 87.87 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... § 87.87 Classification of operator licenses and endorsements. (a) Commercial radio operator licenses... restricted certificate) [53 FR 28940, Aug. 1, 1988, as amended at 78 FR 23158, Apr. 18, 2013] ...

  11. How Institutionalized Are Model License Use Terms? An Analysis of E-Journal License Use Rights Clauses from 2000 to 2009

    ERIC Educational Resources Information Center

    Eschenfelder, Kristin R.; Tsai, Tien-I; Zhu, Xiaohua; Stewart, Brenton

    2013-01-01

    This paper explored the degree to which use terms proposed by model licenses have become institutionalized across different publishers' licenses. It examined model license use terms in four areas: downloading, scholarly sharing, interlibrary loan, and electronic reserves. Data collection and analysis involved content analysis of 224 electronic…

  12. 14 CFR 420.47 - License modification.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false License modification. 420.47 Section 420.47 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and Conditions § 420.47 License...

  13. 47 CFR 74.765 - Posting of station and operator licenses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... station, together with the name, address, and telephone number of the licensee or local representative of... 47 Telecommunication 4 2012-10-01 2012-10-01 false Posting of station and operator licenses. 74... Power TV, TV Translator, and TV Booster Stations § 74.765 Posting of station and operator licenses. (a...

  14. 47 CFR 74.765 - Posting of station and operator licenses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... station, together with the name, address, and telephone number of the licensee or local representative of... 47 Telecommunication 4 2013-10-01 2013-10-01 false Posting of station and operator licenses. 74... Power TV, TV Translator, and TV Booster Stations § 74.765 Posting of station and operator licenses. (a...

  15. 47 CFR 74.765 - Posting of station and operator licenses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... station, together with the name, address, and telephone number of the licensee or local representative of... 47 Telecommunication 4 2014-10-01 2014-10-01 false Posting of station and operator licenses. 74... Power TV, TV Translator, and TV Booster Stations § 74.765 Posting of station and operator licenses. (a...

  16. 47 CFR 74.765 - Posting of station and operator licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... station, together with the name, address, and telephone number of the licensee or local representative of... 47 Telecommunication 4 2010-10-01 2010-10-01 false Posting of station and operator licenses. 74... Power TV, TV Translator, and TV Booster Stations § 74.765 Posting of station and operator licenses. (a...

  17. 47 CFR 74.765 - Posting of station and operator licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... station, together with the name, address, and telephone number of the licensee or local representative of... 47 Telecommunication 4 2011-10-01 2011-10-01 false Posting of station and operator licenses. 74... Power TV, TV Translator, and TV Booster Stations § 74.765 Posting of station and operator licenses. (a...

  18. 77 FR 22808 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0090] Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or...

  19. 78 FR 44167 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0158] Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or...

  20. 47 CFR 13.201 - Qualifying for a commercial operator license or endorsement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Qualifying for a commercial operator license or endorsement. 13.201 Section 13.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS Examination System § 13.201 Qualifying for a commercial operator license or endorsement...

  1. 47 CFR 13.11 - Holding more than one commercial radio operator license.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Holding more than one commercial radio operator license. 13.11 Section 13.11 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.11 Holding more than one commercial radio operator license. (a) An eligible person...

  2. Hydropower licensing and evolving climate: climate knowledge to support risk assessment for long-term infrastructure decisions

    NASA Astrophysics Data System (ADS)

    Ray, A. J.; Walker, S. H.; Trainor, S. F.; Cherry, J. E.

    2014-12-01

    This presentation focuses on linking climate knowledge to the complicated decision process for hydropower dam licensing, and the affected parties involved in that process. The U.S. Federal Energy Regulatory Commission issues of licenses for nonfederal hydroelectric operations, typically 30-50 year licenses, and longer infrastructure lifespan, a similar time frame as the anticipated risks of changing climate and hydrology. Resources managed by other federal and state agencies such as the NOAA National Marine Fisheries Service may be affected by new or re-licensed projects. The federal Integrated Licensing Process gives the opportunity for affected parties to recommend issues for consultative investigation and possible mitigation, such as impacts to downstream fisheries. New or re-licensed projects have the potential to "pre-adapt" by considering and incorporating risks of climate change into their planned operations as license terms and conditions. Hundreds of hydropower facilities will be up for relicensing in the coming years (over 100 in the western Sierra Nevada alone, and large-scale water projects such as the proposed Lake Powell Pipeline), as well as proposed new dams such as the Susitna project in Alaska. Therefore, there is a need for comprehensive guidance on delivering climate analysis to support understanding of risks of hydropower projects to other affected resources, and decisions on licensing. While each project will have a specific context, many of the questions will be similar. We also will discuss best practices for the use of climate science in water project planning and management, and how creating the best and most appropriate science is also still a developing art. We will discuss the potential reliability of that science for consideration in long term planning, licensing, and mitigation planning for those projects. For science to be "actionable," that science must be understood and accepted by the potential users. This process is a negotiation

  3. 10 CFR Appendix B to Subpart A of... - Environmental Effect of Renewing the Operating License of a Nuclear Power Plant

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... environmental impacts of renewing the operating license for a nuclear power plant as required by section 102(2... cooling ponds and is not expected to be a problem during the license renewal term. Aquatic Ecology (for... depression beyond the site boundary. Impacts of large ground-water withdrawal for cooling tower makeup at...

  4. 47 CFR 0.483 - Applications for amateur or commercial radio operator licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Applications for amateur or commercial radio operator licenses. 0.483 Section 0.483 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL..., and for Taking Examinations § 0.483 Applications for amateur or commercial radio operator licenses. (a...

  5. 77 FR 26321 - Reed College, Reed Research Nuclear Reactor, Renewed Facility Operating License No. R-112

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... Nuclear Reactor, Renewed Facility Operating License No. R-112 AGENCY: Nuclear Regulatory Commission... Commission (NRC or the Commission) has issued renewed Facility Operating License No. R- 112, held by Reed... License No. R-112 will expire 20 years from its date of issuance. The renewed facility operating license...

  6. Near-term Horizontal Launch for Flexible Operations: Results of the DARPA/NASA Horizontal Launch Study

    NASA Technical Reports Server (NTRS)

    Bartolotta, Paul A.; Wilhite, Alan W.; Schaffer, Mark G.; Huebner, Lawrence D.; Voland, Randall T.; Voracek, David F.

    2012-01-01

    Horizontal launch has been investigated for 60 years by over 130 different studies. During this time only one concept, Pegasus, has ever been in operation. The attractiveness of horizontal launch is the capability to provide a "mobile launch pad" that can use existing aircraft runways, cruise above weather, loiter for mission instructions, and provide precise placement for orbital intercept, rendezvous, or reconnaissance. A jointly sponsored study by DARPA and NASA, completed in 2011, explored the trade space of horizontal launch system concepts which included an exhaustive literature review of the past 70 years. The Horizontal Launch Study identified potential near- and mid-term concepts capable of delivering 15,000 lb payloads to a 28.5 due East inclination, 100 nautical-mile low-Earth orbit. Results are presented for a range of near-term system concepts selected for their availability and relatively low design, development, test, and evaluation (DDT&E) costs. This study identified a viable low-cost development path forward to make a robust and resilient horizontal launch capability a reality.

  7. 78 FR 22576 - Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ... Facility Operating License Involving Proposed No Significant Hazards Consideration Determination; San... Operating License No. NPF-10, issued to Southern California Edison (SCE, the licensee), for operation of the... operating conditions'' and ``normal steady state full power operation'' and restricts operation to 70...

  8. 78 FR 17450 - Notice of Issuance of Materials License Renewal, Operating License SUA-1341, Uranium One USA, Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-21

    ... License Renewal, Operating License SUA-1341, Uranium One USA, Inc., Willow Creek Uranium In Situ Recovery.... SUA- 1341 to Uranium One USA, Inc. (Uranium One) for its Willow Creek Uranium In Situ Recovery (ISR) Project in Johnson and Campbell Counties, Wyoming. ADDRESSES: Please refer to Docket ID NRC-2009-0036 when...

  9. 47 CFR 90.765 - Licenses term for Phase II licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 220-222 MHz Band Policies Governing the Licensing and Use of Phase II Ea, Regional and Nationwide...(a), EA and Regional licenses authorized pursuant to § 90.761, and non-nationwide licenses authorized...

  10. 47 CFR 90.765 - Licenses term for Phase II licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 220-222 MHz Band Policies Governing the Licensing and Use of Phase II Ea, Regional and Nationwide...(a), EA and Regional licenses authorized pursuant to § 90.761, and non-nationwide licenses authorized...

  11. 77 FR 77001 - Comprehensive Review of Licensing and Operating Rules for Satellite Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ...] Comprehensive Review of Licensing and Operating Rules for Satellite Services AGENCY: Federal Communications... Notice of Proposed Rulemaking that initiated a comprehensive review of the Commission's rules governing... summary of the Order in IB Docket No. 12-267, Comprehensive Review of Licensing and Operating Rules for...

  12. 77 FR 61513 - Voluntary Licensing of Amateur Rocket Operations; Correction; Delay of Effective Date

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ...-0318; Notice No. 400-4] RIN 2120-AK16 Voluntary Licensing of Amateur Rocket Operations; Correction... allow launch operators that conduct certain amateur rocket launches an opportunity to voluntarily apply... final rule entitled, ``Voluntary Licensing of Amateur Rocket Operations'' (77 FR 50584). In this rule...

  13. 10 CFR Appendix B to Subpart A of... - Environmental Effect of Renewing the Operating License of a Nuclear Power Plant

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Environmental Effect of Renewing the Operating License of a Nuclear Power Plant B Appendix B to Subpart A of Part 51 Energy NUCLEAR REGULATORY COMMISSION... near these plants could be of moderate significance in some situations. See § 51.53(c)(3)(ii)(A...

  14. 47 CFR 25.121 - License term and renewals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... specified in the instrument of authorization. (d) Space stations. (1) For geostationary satellite orbit...-geostationary satellite orbit satellites, the license term will begin at 3 a.m. EST on the date that the... system replacement authorization for non-geostationary orbit satellites shall be filed no earlier than 90...

  15. 47 CFR 25.121 - License term and renewals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... specified in the instrument of authorization. (d) Space stations. (1) For geostationary satellite orbit...-geostationary satellite orbit satellites, the license term will begin at 3 a.m. EST on the date that the... system replacement authorization for non-geostationary orbit satellites shall be filed no earlier than 90...

  16. 47 CFR 25.121 - License term and renewals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... specified in the instrument of authorization. (d) Space stations. (1) For geostationary satellite orbit...-geostationary satellite orbit satellites, the license term will begin at 3 a.m. EST on the date that the... system replacement authorization for non-geostationary orbit satellites shall be filed no earlier than 90...

  17. 47 CFR 25.121 - License term and renewals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... specified in the instrument of authorization. (d) Space stations. (1) For geostationary satellite orbit...-geostationary satellite orbit satellites, the license term will begin at 3 a.m. EST on the date that the... system replacement authorization for non-geostationary orbit satellites shall be filed no earlier than 90...

  18. 76 FR 62868 - Washington State University; Notice of Issuance of Renewed Facility Operating License No. R-76

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ...; Notice of Issuance of Renewed Facility Operating License No. R-76 AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance of renewed facility operating license No. R- 76. ADDRESSES: You can access.... Nuclear Regulatory Commission (NRC, the Commission) has issued renewed Facility Operating License No. R-76...

  19. 76 FR 44614 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... Facility Operating Licenses Involving No Significant Hazards Considerations Background Pursuant to Section... authority to issue and make immediately effective any amendment to an operating license upon a determination... electronic form will be posted on the NRC Web site and on the Federal rulemaking Web site http://www...

  20. 18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.106 Standard terms and conditions of case-specific exemption from licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is...

  1. 18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.106 Standard terms and conditions of case-specific exemption from licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is...

  2. 18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.106 Standard terms and conditions of case-specific exemption from licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is...

  3. 77 FR 20853 - Entergy Nuclear Operations, Inc.; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... Operations, Inc.; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by the Commission... Atomic Safety and Licensing Board (Board) is being established to preside over the following proceeding... administrative judges: Ann Marshall Young, Chair, Atomic Safety and Licensing Board Panel, U.S. Nuclear...

  4. 77 FR 30029 - Entergy Nuclear Operations, Inc.; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... Operations, Inc.; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by the Commission... Atomic Safety and Licensing Board (Board) is being established to preside over the following proceeding... of the following administrative judges: Ann Marshall Young, Chair, Atomic Safety and Licensing Board...

  5. 77 FR 67269 - Voluntary Licensing of Amateur Rocket Operations; Withdrawal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ...-0318; Amdt. No. 400-4] RIN 2120-AK16 Voluntary Licensing of Amateur Rocket Operations; Withdrawal... that conduct certain amateur rocket launches to voluntarily apply for a commercial space transportation... give operators of Class 3 advanced high-power rockets the option of applying for a chapter III launch...

  6. Use of a Prototype Airborne Separation Assurance System for Resolving Near-Term Conflicts During Autonomous Aircraft Operations

    NASA Technical Reports Server (NTRS)

    Barhydt, Richard; Eischeid, Todd M.; Palmer, Michael T.; Wing, David J.

    2003-01-01

    NASA is currently investigating a new concept of operations for the National Airspace System, designed to improve capacity while maintaining or improving current levels of safety. This concept, known as Distributed Air/Ground Traffic Management (DAGTM), allows appropriately equipped autonomous aircraft to maneuver freely for flight optimization while resolving conflicts with other traffic and staying out of special use airspace and hazardous weather. In order to perform these tasks, pilots use prototype conflict detection, prevention, and resolution tools, collectively known as an Airborne Separation Assurance System (ASAS). While ASAS would normally allow pilots to resolve conflicts before they become hazardous, evaluation of system performance in sudden, near-term conflicts is needed in order to determine concept feasibility. An experiment was conducted in NASA Langley's Air Traffic Operations Lab to evaluate the prototype ASAS for enabling pilots to resolve near-term conflicts and examine possible operational effects associated with the use of lower separation minimums. Sixteen commercial airline pilots flew a total of 32 traffic scenarios that required them to use prototype ASAS tools to resolve close range pop-up conflicts. Required separation standards were set at either 3 or 5 NM lateral spacing, with 1000 ft vertical separation being used for both cases. Reducing the lateral separation from 5 to 3 NM did not appear to increase operational risk, as indicated by the proximity to the intruder aircraft. Pilots performed better when they followed tactical guidance cues provided by ASAS than when they didn't follow the guidance. In an effort to improve compliance rate, ASAS design changes are currently under consideration. Further studies will of evaluate these design changes and consider integration issues between ASAS and existing Airborne Collision Avoidance Systems (ACAS).

  7. 77 FR 14441 - Facility Operating License Amendment From Southern Nuclear Operating, Inc., Joseph M. Farley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-348 AND 50-364; NRC-2012-0053] Facility Operating License Amendment From Southern Nuclear Operating, Inc., Joseph M. Farley Nuclear Plant, Units 1 and 2...-0053. You may submit comments by the following methods: Federal Rulemaking Web site: Go to http://www...

  8. NASA's EOSDIS Near Term Challenges

    NASA Technical Reports Server (NTRS)

    Behnke, Jeanne

    2018-01-01

    Given the long-term requirements, and the rapid pace of information technology and changing expectations of the user community, the ESDIS Project has had to evolve EOSDIS continually over the past three decades. However, many challenges remain. One near-term challenge is the enormous quantity of new data that will need to be managed by the EOSDIS. With the upcoming launch of the latest NASA missions coupled with existing operational missions and field campaigns, EOSDIS can expect to handle as much as 50 petabytes of data per year. In perspective, this is twice the size of the current existing archive, which took over 21 years to collect. Another continuing challenge is the disparate requirements of a diverse science community. Maintaining rigorous long-term data preservation, supporting ease of discovery and access, incorporating user feedback, enabling reanalysis/ reprocessing, and agile integration of new data sources, continue to be the Project's objectives.

  9. 76 FR 3678 - FirstEnergy Nuclear Operating Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... Nuclear Operating Company; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by... hereby given that an Atomic Safety and Licensing Board (Board) is being established to preside over the... administrative judges: William J. Froehlich, Chair, Atomic Safety and Licensing Board Panel, U.S. Nuclear...

  10. 78 FR 46255 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ... environmental effect of renewing the operating license of a nuclear power plant. This document is necessary to..., Environmental impact statement, Nuclear materials, Nuclear power plants and reactors, Reporting and... Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction AGENCY: Nuclear...

  11. Licensing a new industrial irradiator.

    PubMed

    Bates, Nicolas K; Entwistle, Frederick B

    2010-02-01

    After nearly three decades of medical product sterilization, 3M launched a major new project to build and license an irradiator facility. 3M Corporate Health Physics was responsible for the licensing aspect of this project. The licensing process consisted of six amendments, over 30 submissions to the U.S. Nuclear Regulatory Commission (U.S. NRC) and four U.S. NRC site visits. It took approximately 22 months to complete. The six license amendments are reviewed and several of the submissions are discussed. These include 3M's response to the U.S. NRC's interest in the shielding calculations used for the bioshield, the development of a protocol of radiation safety system test methods, and an analysis to show that a dropped cask during loading operations would not fall on sealed sources. A number of lessons were learned during the course of licensing the new irradiator. Among these were the importance of understanding the U.S. NRC license reviewer's perspective, the need to thoroughly review the irradiator manufacturer's licensing package during project negotiations, the benefits of leaving the Health Physics Office and meeting with the non-health physicists involved in the project, and the necessity of maintaining the solid relationships that already existed with the site Radiation Safety Officer and Sterilization Engineer.

  12. 77 FR 30559 - Entergy Nuclear Operations, Inc.; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... Operations, Inc.; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by the Commission... Atomic Safety and Licensing Board (Board) is being established to preside over the following proceeding... is comprised of the following administrative judges: Ann Marshall Young, Chair, Atomic Safety and...

  13. 75 FR 53985 - Southern Nuclear Operating Company Establishment of Atomic Safety And Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-02

    ...] Southern Nuclear Operating Company Establishment of Atomic Safety And Licensing Board Pursuant to..., notice is hereby given that an Atomic Safety and Licensing Board (Board) is being established to preside...). The Board is comprised of the following administrative judges: G. Paul Bollwerk, III, Chairman, Atomic...

  14. 76 FR 17460 - South Texas Project Nuclear Operating Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ...] South Texas Project Nuclear Operating Company; Establishment of Atomic Safety and Licensing Board..., 2.318, and 2.321, notice is hereby given that an Atomic Safety and Licensing Board (Board) is being...: Ronald M. Spritzer, Chair, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission...

  15. 78 FR 73898 - Operator Licensing Examination Standards for Power Reactors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-09

    ... Reactors AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for comment. SUMMARY: The U.S..., Revision 10, ``Operator Licensing Examination Standards for Power Reactors.'' DATES: Submit comments [email protected] . Both of the Office of New Reactors; or Timothy Kolb, Office of Nuclear Reactor Regulation, U...

  16. 77 FR 7613 - Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-264; NRC-2012-0026] Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108 AGENCY: Nuclear Regulatory Commission... Facility Operating License No. R-108 (``Application''), which currently authorizes the Dow Chemical Company...

  17. Near-Term Actions to Address Long-Term Climate Risk

    NASA Astrophysics Data System (ADS)

    Lempert, R. J.

    2014-12-01

    Addressing climate change requires effective long-term policy making, which occurs when reflecting on potential events decades or more in the future causes policy makers to choose near-term actions different than those they would otherwise pursue. Contrary to some expectations, policy makers do sometimes make such long-term decisions, but not as commonly and successfully as climate change may require. In recent years however, the new capabilities of analytic decision support tools, combined with improved understanding of cognitive and organizational behaviors, has significantly improved the methods available for organizations to manage longer-term climate risks. In particular, these tools allow decision makers to understand what near-term actions consistently contribute to achieving both short- and long-term societal goals, even in the face of deep uncertainty regarding the long-term future. This talk will describe applications of these approaches for infrastructure, water, and flood risk management planning, as well as studies of how near-term choices about policy architectures can affect long-term greenhouse gas emission reduction pathways.

  18. The accuracy of coin-operated breath analysers installed in licensed premises in the Perth metropolitan area.

    PubMed

    Hay, Greg; Cercarelli, L Rina

    2004-04-01

    To examine the accuracy of coin-operated breath analysers installed in licensed premises in the Perth metropolitan area. Two hundred licensed premises were contacted, which resulted in the location of 36 wall-mounted, coin-operated breath analysers. One instrument was removed prior to testing. These premises were then visited and the accuracy of the instruments was tested in situ using National Association of Testing Authorities Australia (NATA) certified 0.080% and 0.100% ethanol in nitrogen gas. The instruments were installed in the licensed premises as follows: 15 in the lounge bar, 10 in the main entrance, six in the public bar, two in the passageway to the toilets, and one in the male toilets. One licensed premise provided a handheld breath instrument. All instruments were accompanied by warning and operating instructions, but only five had any educational material. Only seven of the licensed premises had staff who had received any training in the operation of the wall-mounted instruments. Half of the licensees were unaware of the servicing requirements of the instruments. The testing found that only nine (25%) of the instruments provided acceptable results. The low level of accuracy of coin-operated breath analysers in the Perth metropolitan area is alarming and users should be informed of the potential inaccuracies. This paper, however, does not rule out that some wall-mounted breath analysing instruments may provide accurate results when properly maintained.

  19. 10 CFR 55.51 - Issuance of licenses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Issuance of licenses. 55.51 Section 55.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Licenses § 55.51 Issuance of licenses. Operator and senior operator licenses. If the Commission determines that an applicant for an operator license or a...

  20. Community engagement as conflict prevention: Understanding the social license to operate

    NASA Astrophysics Data System (ADS)

    Knih, Dejana

    This thesis examines community engagement as a form of conflict prevention in order to obtain the social license to operate (SLO) in Alberta's oil and gas industry. It does this by answering the question: what are the key elements of the Social License to Operate and how can these elements be applied to community engagement/consultation in a way that prevents conflicts in Alberta's oil and gas industry? The underlying assumption of this thesis is that building good relationships and working collaboratively functions as a form of conflict prevention and that this in turn leads to the SLO. This thesis outlines the key features of both successful community engagement and of the SLO, to provide a guideline for what is needed to obtain the SLO. Data was collected from semi-structured interviews and through a literature review. The data analysis concluded that there are direct parallels between the key elements of effective community engagement and the key elements of the SLO as identified in the interviews. These parallels are: knowing the community, addressing community needs, corporate social responsibility, relationship building, follow through and evidence for what has been done, executive buy-in, excellent communication, and open dialogue, all within a process which is principled (there is trust, understanding, transparency and respect), inclusive, dynamic, flexible, ongoing, and long-term. Moreover, the key elements of effective community engagement and of the SLO identified in the interviews also overlapped with those found in the literature review, with only one exception. The literature review explicitly named early involvement as a key element of both effective community engagement and the SLO, whereas the interview participants only explicitly indicated it as a key factor of community engagement and implied it to be a key element of the SLO.

  1. Licensing Process | NREL

    Science.gov Websites

    Agreement After the company and NREL agree on license financial terms, NREL will draft a license agreement Group Licensing Guide and Sample License. 4. Negotiate License Language After a draft agreement has been created, NREL can tailor many of the license provisions to ensure an agreement that works for all parties

  2. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple... construct and operate nuclear power reactors of identical design (“common design”) to be located at multiple...

  3. 10 CFR 40.28 - General license for custody and long-term care of uranium or thorium byproduct materials disposal...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false General license for custody and long-term care of uranium or thorium byproduct materials disposal sites. 40.28 Section 40.28 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL General Licenses § 40.28 General license for custody and...

  4. 78 FR 33449 - FirstEnergy Nuclear Operating Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-04

    ... Nuclear Operating Company; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by... 2.104, 2.105, 2.300, 2.309, 2.313, 2.318, and 2.321, notice is hereby given that an Atomic Safety... administrative judges: Paul S. Ryerson, Chairman, Atomic Safety and Licensing Board Panel, U.S. Nuclear...

  5. 14 CFR 420.41 - License to operate a launch site-general.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... does it confer any proprietary, property, or exclusive right in the use of airspace or outer space. ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false License to operate a launch site-general. 420.41 Section 420.41 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION...

  6. 14 CFR 420.41 - License to operate a launch site-general.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... does it confer any proprietary, property, or exclusive right in the use of airspace or outer space. ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false License to operate a launch site-general. 420.41 Section 420.41 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION...

  7. 14 CFR 420.41 - License to operate a launch site-general.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... does it confer any proprietary, property, or exclusive right in the use of airspace or outer space. ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false License to operate a launch site-general. 420.41 Section 420.41 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION...

  8. Supervisory autonomous local-remote control system design: Near-term and far-term applications

    NASA Technical Reports Server (NTRS)

    Zimmerman, Wayne; Backes, Paul

    1993-01-01

    The JPL Supervisory Telerobotics Laboratory (STELER) has developed a unique local-remote robot control architecture which enables management of intermittent bus latencies and communication delays such as those expected for ground-remote operation of Space Station robotic systems via the TDRSS communication platform. At the local site, the operator updates the work site world model using stereo video feedback and a model overlay/fitting algorithm which outputs the location and orientation of the object in free space. That information is relayed to the robot User Macro Interface (UMI) to enable programming of the robot control macros. The operator can then employ either manual teleoperation, shared control, or supervised autonomous control to manipulate the object under any degree of time-delay. The remote site performs the closed loop force/torque control, task monitoring, and reflex action. This paper describes the STELER local-remote robot control system, and further describes the near-term planned Space Station applications, along with potential far-term applications such as telescience, autonomous docking, and Lunar/Mars rovers.

  9. 14 CFR 420.41 - License to operate a launch site-general.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false License to operate a launch site-general. 420.41 Section 420.41 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... regulations; nor does it confer any proprietary, property, or exclusive right in the use of airspace or outer...

  10. 14 CFR 420.41 - License to operate a launch site-general.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false License to operate a launch site-general. 420.41 Section 420.41 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... regulations; nor does it confer any proprietary, property, or exclusive right in the use of airspace or outer...

  11. 78 FR 29393 - University of Missouri-Columbia Facility Operating License No. R-103

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... Curators of the University of Missouri--Columbia (the licensee) to operate the Missouri University Research Reactor (MURR) at a maximum steady-state thermal power of 10 megawatts (MW). The renewed license would authorize the licensee to operate the MURR up to a steady-state thermal power of 10 MW for an additional 20...

  12. 77 FR 36015 - Atomic Safety and Licensing Board; Entergy Nuclear Operations, Inc. (Indian Point Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247-LR and 50-286-LR; ASLBP No. 07-858-03-LR-BD01] Atomic Safety and Licensing Board; Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3); Notice of Hearing (Application for License Renewal) June 8, 2012. Before Administrative Judges: Lawrence G. McDade, Chairman, Dr....

  13. AP1000{sup R} licensing and deployment in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two newmore » nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions

  14. 47 CFR 1.957 - Procedure with respect to amateur radio operator license.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Procedure with respect to amateur radio... AND PROCEDURE Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.957 Procedure with respect to amateur radio operator license. Each candidate for an amateur...

  15. 47 CFR 1.957 - Procedure with respect to amateur radio operator license.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... AND PROCEDURE Grants by Random Selection Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.957 Procedure with respect to amateur radio operator license. Each... 47 Telecommunication 1 2013-10-01 2013-10-01 false Procedure with respect to amateur radio...

  16. 47 CFR 1.957 - Procedure with respect to amateur radio operator license.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... AND PROCEDURE Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.957 Procedure with respect to amateur radio operator license. Each candidate for an amateur... 47 Telecommunication 1 2011-10-01 2011-10-01 false Procedure with respect to amateur radio...

  17. 47 CFR 1.957 - Procedure with respect to amateur radio operator license.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... AND PROCEDURE Grants by Random Selection Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.957 Procedure with respect to amateur radio operator license. Each... 47 Telecommunication 1 2014-10-01 2014-10-01 false Procedure with respect to amateur radio...

  18. 47 CFR 1.957 - Procedure with respect to amateur radio operator license.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... AND PROCEDURE Grants by Random Selection Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.957 Procedure with respect to amateur radio operator license. Each... 47 Telecommunication 1 2012-10-01 2012-10-01 false Procedure with respect to amateur radio...

  19. 75 FR 50009 - Babcock & Wilcox Nuclear Operations Group, Inc.; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... Nuclear Operations Group, Inc.; Establishment of Atomic Safety and Licensing Board Pursuant to delegation... 2.106, 2.300, 2.313(a), and 2.318, notice is hereby given that an Atomic Safety and Licensing Board..., 2010. The Board is comprised of the following administrative judges: Alan S. Rosenthal, Chair, Atomic...

  20. 10 CFR 40.28 - General license for custody and long-term care of uranium or thorium byproduct materials disposal...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false General license for custody and long-term care of uranium... long-term care of uranium or thorium byproduct materials disposal sites. (a) A general license is... in this part for uranium or thorium mill tailings sites closed under title II of the Uranium Mill...

  1. 10 CFR 40.28 - General license for custody and long-term care of uranium or thorium byproduct materials disposal...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false General license for custody and long-term care of uranium... long-term care of uranium or thorium byproduct materials disposal sites. (a) A general license is... in this part for uranium or thorium mill tailings sites closed under title II of the Uranium Mill...

  2. 10 CFR 40.28 - General license for custody and long-term care of uranium or thorium byproduct materials disposal...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false General license for custody and long-term care of uranium... long-term care of uranium or thorium byproduct materials disposal sites. (a) A general license is... in this part for uranium or thorium mill tailings sites closed under title II of the Uranium Mill...

  3. 10 CFR 40.28 - General license for custody and long-term care of uranium or thorium byproduct materials disposal...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false General license for custody and long-term care of uranium... long-term care of uranium or thorium byproduct materials disposal sites. (a) A general license is... in this part for uranium or thorium mill tailings sites closed under title II of the Uranium Mill...

  4. Social license to operate: case from brazilian mining industry

    NASA Astrophysics Data System (ADS)

    Santiago, Ana Lúcia F.; Demajorovic, Jacques; Aledo, Antonio

    2015-04-01

    The approach of the Social License to Operate (SLO) emerges as an important element in academic discussions and business practices related to extractive industries. It appears that in productive activities with great potential to produce economic, social and environmental impacts, conventional approaches based on legal compliance no longer sufficient to legitimize the actions of companies and engagement stakeholders. Studies highlight the need of mining activities receiving a SLO "issued" by companies stakeholders, including society, government, non-governmental organizations, media and communities. However, local communities appears as major stakeholders in governance arrangements, by virtue of its proximity to extractive areas and ability to affect the company's results. Stakeholders with unmet expectations can generate conflicts and risks to the company, the knowledge of these expectations and an awareness of company managers of the importance of Social License to Operate (SLO), can generate strategies and mitigating actions to prevent and or minimize possible conflicts. The concept of SLO arises in engineering extractive industry, when you need to respond to social challenges, beyond the usual environmental challenges, technological and management. According to Franks and Cohen (2012) there is a tendency of engineering sectors, sustainability, environmental, safety and especially in risk mappings, treat the technological issues in a neutral manner, separating the technological research projects of social influences. I want to contribute to the advancement of the debate on stakeholder engagement and adopting as focus on the company's relationship with the community, the aim of this study was to understand how a social project held by one of the largest mining companies in Brazil contributed to the process of SLO. This methodological procedure adopted was a qualitative, descriptive, and exploratory interviews with the communities located in rural areas of direct

  5. 10 CFR 55.3 - License requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false License requirements. 55.3 Section 55.3 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES General Provisions § 55.3 License requirements. A person must be authorized by a license issued by the Commission to perform the function of an operator or...

  6. 10 CFR 55.3 - License requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false License requirements. 55.3 Section 55.3 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES General Provisions § 55.3 License requirements. A person must be authorized by a license issued by the Commission to perform the function of an operator or...

  7. 31 CFR 598.306 - General license.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false General license. 598.306 Section 598.306 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF... Definitions § 598.306 General license. The term general license means any license or authorization the terms...

  8. 31 CFR 598.306 - General license.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 3 2011-07-01 2011-07-01 false General license. 598.306 Section 598.306 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF... Definitions § 598.306 General license. The term general license means any license or authorization the terms...

  9. 31 CFR 598.306 - General license.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance:Treasury 3 2013-07-01 2013-07-01 false General license. 598.306 Section 598.306 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF... Definitions § 598.306 General license. The term general license means any license or authorization the terms...

  10. 31 CFR 598.306 - General license.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance:Treasury 3 2014-07-01 2014-07-01 false General license. 598.306 Section 598.306 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF... Definitions § 598.306 General license. The term general license means any license or authorization the terms...

  11. 31 CFR 598.306 - General license.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance:Treasury 3 2012-07-01 2012-07-01 false General license. 598.306 Section 598.306 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF... Definitions § 598.306 General license. The term general license means any license or authorization the terms...

  12. Near Term Capacity Initiatives

    DOT National Transportation Integrated Search

    1992-07-01

    One of the major aviation challenges in recent years has been the increase in : the number and duration of flight delays. This pamphlet offers the reader a : description of near-term capacity initiatives, their intended purpose, an : indication of wh...

  13. 14 CFR 294.87 - Compliance with Canadian licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Compliance with Canadian licenses. 294.87 Section 294.87 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS CANADIAN CHARTER AIR TAXI OPERATORS Terms, Conditions, and Limitations of...

  14. 14 CFR 294.87 - Compliance with Canadian licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Compliance with Canadian licenses. 294.87 Section 294.87 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS CANADIAN CHARTER AIR TAXI OPERATORS Terms, Conditions, and Limitations of...

  15. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  16. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  17. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  18. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  19. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... REUSABLE LAUNCH VEHICLE (RLV) Post-Licensing Requirements-Reusable Launch Vehicle Mission License Terms and...

  20. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... REUSABLE LAUNCH VEHICLE (RLV) Post-Licensing Requirements-Reusable Launch Vehicle Mission License Terms and...

  1. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... REUSABLE LAUNCH VEHICLE (RLV) Post-Licensing Requirements-Reusable Launch Vehicle Mission License Terms and...

  2. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... REUSABLE LAUNCH VEHICLE (RLV) Post-Licensing Requirements-Reusable Launch Vehicle Mission License Terms and...

  3. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... REUSABLE LAUNCH VEHICLE (RLV) Post-Licensing Requirements-Reusable Launch Vehicle Mission License Terms and...

  4. Function of university reactors in operator licensing training for nuclear utilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wicks, F.

    1985-11-01

    The director of the Division of the US Nuclear Regulatory Commission in generic letter 84-10, dated April 26, 1984, spoke the requirement that applicants for senior reactor operator licenses for power reactors shall have performed then reactor startups. Simulator startups were not acknowledged. Startups performed on a university reactor are acceptable. The content and results of a five-day program combining instruction and experiments with the Rensselaer reactor are summarized.

  5. 77 FR 15818 - License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...

  6. 10 CFR 40.27 - General license for custody and long-term care of residual radioactive material disposal sites.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false General license for custody and long-term care of residual... residual radioactive material disposal sites. (a) A general license is issued for the custody of and long... water characterization and any necessary ground water protection activities or strategies. This...

  7. 47 CFR 13.9 - Eligibility and application for new license or endorsement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS Radio Operator's... Radiotelephone Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar...

  8. 47 CFR 13.9 - Eligibility and application for new license or endorsement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS Radio Operator's... Radiotelephone Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar...

  9. 10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2013-01-01 2013-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  10. 10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2011-01-01 2011-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  11. 10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2014-01-01 2014-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  12. 10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2012-01-01 2012-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  13. 10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2010-01-01 2010-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  14. Near-Term Laser Launch Capability: The Heat Exchanger Thruster

    NASA Astrophysics Data System (ADS)

    Kare, Jordin T.

    2003-05-01

    The heat exchanger (HX) thruster concept uses a lightweight (up to 1 MW/kg) flat-plate heat exchanger to couple laser energy into flowing hydrogen. Hot gas is exhausted via a conventional nozzle to generate thrust. The HX thruster has several advantages over ablative thrusters, including high efficiency, design flexibility, and operation with any type of laser. Operating the heat exchanger at a modest exhaust temperature, nominally 1000 C, allows it to be fabricated cheaply, while providing sufficient specific impulse (~600 seconds) for a single-stage vehicle to reach orbit with a useful payload; a nominal vehicle design is described. The HX thruster is also comparatively easy to develop and test, and offers an extremely promising route to near-term demonstration of laser launch.

  15. 31 CFR 598.308 - License.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false License. 598.308 Section 598.308 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN... Definitions § 598.308 License. Except as otherwise specified, the term license means any license or...

  16. 31 CFR 598.308 - License.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance:Treasury 3 2014-07-01 2014-07-01 false License. 598.308 Section 598.308 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS... § 598.308 License. Except as otherwise specified, the term license means any license or authorization...

  17. 31 CFR 598.308 - License.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 3 2011-07-01 2011-07-01 false License. 598.308 Section 598.308 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS... § 598.308 License. Except as otherwise specified, the term license means any license or authorization...

  18. 31 CFR 598.308 - License.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance:Treasury 3 2013-07-01 2013-07-01 false License. 598.308 Section 598.308 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS... § 598.308 License. Except as otherwise specified, the term license means any license or authorization...

  19. 31 CFR 598.308 - License.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance:Treasury 3 2012-07-01 2012-07-01 false License. 598.308 Section 598.308 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS... § 598.308 License. Except as otherwise specified, the term license means any license or authorization...

  20. 76 FR 62862 - Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non... document. You may submit comments by any one of the following methods: Federal Rulemaking Web Site: Go to...

  1. Modified symplectic schemes with nearly-analytic discrete operators for acoustic wave simulations

    NASA Astrophysics Data System (ADS)

    Liu, Shaolin; Yang, Dinghui; Lang, Chao; Wang, Wenshuai; Pan, Zhide

    2017-04-01

    Using a structure-preserving algorithm significantly increases the computational efficiency of solving wave equations. However, only a few explicit symplectic schemes are available in the literature, and the capabilities of these symplectic schemes have not been sufficiently exploited. Here, we propose a modified strategy to construct explicit symplectic schemes for time advance. The acoustic wave equation is transformed into a Hamiltonian system. The classical symplectic partitioned Runge-Kutta (PRK) method is used for the temporal discretization. Additional spatial differential terms are added to the PRK schemes to form the modified symplectic methods and then two modified time-advancing symplectic methods with all of positive symplectic coefficients are then constructed. The spatial differential operators are approximated by nearly-analytic discrete (NAD) operators, and we call the fully discretized scheme modified symplectic nearly analytic discrete (MSNAD) method. Theoretical analyses show that the MSNAD methods exhibit less numerical dispersion and higher stability limits than conventional methods. Three numerical experiments are conducted to verify the advantages of the MSNAD methods, such as their numerical accuracy, computational cost, stability, and long-term calculation capability.

  2. 78 FR 5840 - Notice of License Termination for University of Illinois Advanced TRIGA Reactor, License No. R-115

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... University of Illinois Advanced TRIGA Reactor, License No. R-115 The U.S. Nuclear Regulatory Commission (NRC) is noticing the termination of Facility Operating License No. R-115, for the University of Illinois... Operating License No. R-115 is terminated. The above referenced documents may be examined, and/or copied for...

  3. 75 FR 51490 - Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ...). The proposed amendment would approve the cyber security plan and implementation schedule, and revise... maintain in effect all provisions of the NRC-approved cyber security plan. Basis for proposed no... [facility operating license] to implement and maintain a Cyber Security Plan as part of Energy Northwest's...

  4. 75 FR 62592 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... Operating Licenses include: (1) The proposed Cyber Security Plan for CCNPP, Ginna, and NMPNS, (2) an... provisions of the Nuclear Regulatory Commission-approved Cyber Security Plan for CCNPP, Ginna, and NMPNS as... Communication Systems and Networks,'' establish the requirements for a cyber security program. This regulation...

  5. 75 FR 68831 - Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ...-safeguards information (SUNSI). The amendments would approve the proposed Cyber Security Plan and... Commission-approved Cyber Security Plan as required by 10 CFR 73.54. Basis for proposed no significant... Facility Operating License (FOL) to implement and maintain a Cyber Security Plan as part of the facility's...

  6. 78 FR 78411 - Consideration of Approval of Transfer of Renewed Facility Operating Licenses, Materials Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... licenses for nuclear power plants and spent fuel storage facilities from the current holder, Constellation... Independent Spent Fuel Storage Installation (ISFSI) Materials License No. SNM-2505; Nine Mile Point Nuclear.... A request for a hearing must be filed by January 15, 2014. Any potential party as defined in Sec. 2...

  7. 78 FR 40519 - Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ...; Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards... submitting comments on a specific subject): Federal Rulemaking Web site: Go to http://www.regulations.gov and...: Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0139. NRC...

  8. Near term application of water cooling

    NASA Astrophysics Data System (ADS)

    Horner, M. W.; Caruvana, A.; Cohn, A.; Smith, D. P.

    1980-03-01

    The paper presents studies of combined gas and steam-turbine cycles related to the near term application of water cooling technology to the commercial gas turbine operating on heavy residual oil or coal derived liquid fuels. Water cooling promises significant reduction of hot corrosion and ash deposition at the turbine first-stage nozzle. It was found that: (1) corrosion of some alloys in the presence of alkali contaminant was less as metal temperatures were lowered to the 800-1000 F range, (2) the rate of ash deposition is increased for air-cooled and water-cooled nozzles at the 2060 F turbine firing temperature compared to 1850 F, (3) the ash deposit for the water cooled nozzle was lighter and more easily removed at both 1850 and 2050 F, (4) on-line nutshelling was effective on the water-cooled nozzles even at 2050 F, and (5) the data indicates that the rate of ash deposition may be sensitive to surface wall temperatures.

  9. 10 CFR 55.53 - Conditions of licenses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Conditions of licenses. 55.53 Section 55.53 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Licenses § 55.53 Conditions of licenses. Each license contains and is subject to the following conditions whether stated in the license or not: (a) Neither the...

  10. 30 CFR 285.638 - What must I do upon completion of my commercial operations as approved in my COP or FERC license?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operations as approved in my COP or FERC license? 285.638 Section 285.638 Mineral Resources BUREAU OF OCEAN... Activities Under An Approved Cop § 285.638 What must I do upon completion of my commercial operations as approved in my COP or FERC license? (a) Upon completion of your approved activities under your COP, you...

  11. 76 FR 64388 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses; Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0241] Biweekly Notice; Applications and Amendments to Facility Operating Licenses; Involving No Significant Hazards Considerations Background Pursuant to section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC) is publishing...

  12. 76 FR 55125 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0205] Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC) is publishing thi...

  13. 76 FR 9821 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0040] Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations I. Background Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC) is publishing...

  14. 76 FR 4381 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0019] Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations I. Background Pursuant to section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC) is publishing...

  15. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...

  16. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...

  17. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  18. A Near Zero Refractive Index Metamaterial for Electromagnetic Invisibility Cloaking Operation

    PubMed Central

    Islam, Sikder Sunbeam; Faruque, Mohammad Rashed Iqbal; Islam, Mohammad Tariqul

    2015-01-01

    The paper reveals the design of a unit cell of a metamaterial that shows more than 2 GHz wideband near zero refractive index (NZRI) property in the C-band region of microwave spectra. The two arms of the unit cell were splitted in such a way that forms a near-pi-shape structure on epoxy resin fiber (FR-4) substrate material. The reflection and transmission characteristics of the unit cell were achieved by utilizing finite integration technique based simulation software. Measured results were presented, which complied well with simulated results. The unit cell was then applied to build a single layer rectangular-shaped cloak that operates in the C-band region where a metal cylinder was perfectly hidden electromagnetically by reducing the scattering width below zero. Moreover, the unit cell shows NZRI property there. The experimental result for the cloak operation was presented in terms of S-parameters as well. In addition, the same metamaterial shell was also adopted for designing an eye-shaped and triangular-shaped cloak structure to cloak the same object, and cloaking operation is achieved in the C-band, as well with slightly better cloaking performance. The novel design, NZRI property, and single layer C-band cloaking operation has made the design a promising one in the electromagnetic paradigm. PMID:28793472

  19. A Near Zero Refractive Index Metamaterial for Electromagnetic Invisibility Cloaking Operation.

    PubMed

    Islam, Sikder Sunbeam; Faruque, Mohammad Rashed Iqbal; Islam, Mohammad Tariqul

    2015-07-29

    The paper reveals the design of a unit cell of a metamaterial that shows more than 2 GHz wideband near zero refractive index (NZRI) property in the C-band region of microwave spectra. The two arms of the unit cell were splitted in such a way that forms a near-pi-shape structure on epoxy resin fiber (FR-4) substrate material. The reflection and transmission characteristics of the unit cell were achieved by utilizing finite integration technique based simulation software. Measured results were presented, which complied well with simulated results. The unit cell was then applied to build a single layer rectangular-shaped cloak that operates in the C-band region where a metal cylinder was perfectly hidden electromagnetically by reducing the scattering width below zero. Moreover, the unit cell shows NZRI property there. The experimental result for the cloak operation was presented in terms of S-parameters as well. In addition, the same metamaterial shell was also adopted for designing an eye-shaped and triangular-shaped cloak structure to cloak the same object, and cloaking operation is achieved in the C-band, as well with slightly better cloaking performance. The novel design, NZRI property, and single layer C-band cloaking operation has made the design a promising one in the electromagnetic paradigm.

  20. Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-06-01

    The US Nuclear Regulatory Commission`s monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided.

  1. 31 CFR 598.315 - Specific license.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance:Treasury 3 2012-07-01 2012-07-01 false Specific license. 598.315 Section 598.315 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF... Definitions § 598.315 Specific license. The term specific license means any license not set forth in this part...

  2. 31 CFR 598.315 - Specific license.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance:Treasury 3 2013-07-01 2013-07-01 false Specific license. 598.315 Section 598.315 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF... Definitions § 598.315 Specific license. The term specific license means any license not set forth in this part...

  3. 31 CFR 598.315 - Specific license.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 3 2011-07-01 2011-07-01 false Specific license. 598.315 Section 598.315 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF... Definitions § 598.315 Specific license. The term specific license means any license not set forth in this part...

  4. 31 CFR 598.315 - Specific license.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance:Treasury 3 2014-07-01 2014-07-01 false Specific license. 598.315 Section 598.315 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF... Definitions § 598.315 Specific license. The term specific license means any license not set forth in this part...

  5. 31 CFR 598.315 - Specific license.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Specific license. 598.315 Section 598.315 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF... Definitions § 598.315 Specific license. The term specific license means any license not set forth in this part...

  6. Spatial service delivery system for smart licensing & enforcement management

    NASA Astrophysics Data System (ADS)

    Wahap, N. A.; Ismail, N. M.; Nor, N. M.; Ahmad, N.; Omar, M. F.; Termizi, A. A. A.; Zainal, D.; Noordin, N. M.; Mansor, S.

    2016-06-01

    Spatial information has introduced a new sense of urgency for a better understanding of the public needs in term of what, when and where they need services and through which devices, platform or physical locations they need them. The objective of this project is to value- add existing license management process for business premises which comes under the responsibility of Local Authority (PBT). Manipulation of geospatial and tracing technology via mobile platform allows enforcement officers to work in real-time, use a standardized system, improve service delivery, and optimize operation management. This paper will augment the scope and capabilities of proposed concept namely, Smart Licensing/Enforcement Management (SLEm). It will review the current licensing and enforcement practice of selected PBT in comparison to the enhanced method. As a result, the new enhanced system is expected to offer a total solution for licensing/enforcement management whilst increasing efficiency and transparency for smart city management and governance.

  7. 10 CFR 55.57 - Renewal of licenses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Renewal of licenses. 55.57 Section 55.57 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Licenses § 55.57 Renewal of licenses. (a) The applicant for renewal of a license shall— (1) Complete and sign Form NRC-398 and include the number of the...

  8. 47 CFR 90.473 - Operation of internal transmitter control systems through licensed fixed control points.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operation of internal transmitter control systems through licensed fixed control points. 90.473 Section 90.473 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Transmitter Control Internal Transmitter Control...

  9. 47 CFR 90.473 - Operation of internal transmitter control systems through licensed fixed control points.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Operation of internal transmitter control systems through licensed fixed control points. 90.473 Section 90.473 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Transmitter Control Internal Transmitter Control...

  10. 47 CFR 90.473 - Operation of internal transmitter control systems through licensed fixed control points.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Operation of internal transmitter control systems through licensed fixed control points. 90.473 Section 90.473 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Transmitter Control Internal Transmitter Control...

  11. 47 CFR 90.473 - Operation of internal transmitter control systems through licensed fixed control points.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Operation of internal transmitter control systems through licensed fixed control points. 90.473 Section 90.473 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Transmitter Control Internal Transmitter Control...

  12. 47 CFR 90.473 - Operation of internal transmitter control systems through licensed fixed control points.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Operation of internal transmitter control systems through licensed fixed control points. 90.473 Section 90.473 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Transmitter Control Internal Transmitter Control...

  13. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... operating licenses for nuclear power reactors, if the Commission has not found that a hearing is in the public interest, the Commission, the Director, Office of New Reactors or Director, Office of Nuclear... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  14. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  15. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  16. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... operating licenses for nuclear power reactors, if the Commission has not found that a hearing is in the public interest, the Commission, the Director, Office of New Reactors or Director, Office of Nuclear... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  17. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  18. Mental Illness Training for Licensed Staff in Long-Term Care

    PubMed Central

    Irvine, A. Blair; Billow, Molly B.; Eberhage, Mark G.; Seeley, John R.; McMahon, Edward; Bourgeois, Michelle

    2013-01-01

    Licensed care staff working in long-term care facilities may be poorly prepared to work with residents with mental illness. This research reports on the program evaluation of Caring Skills: Working with Mental Illness, a training program delivered on the Internet. It was tested with a randomized treatment-control design, with an eight-week follow-up. The training provided video-based behavioral skills and knowledge training. Measures included video situations testing and assessment of psycho-social constructs including empathy and stigmatization. ANCOVA analysis at 4-weeks posttest showed significant positive effects with medium-large effect sizes, which were largely maintained at the 8-week follow-up. The training was well-received by the users. PMID:22364430

  19. 76 FR 10409 - License No. NPF-3; FirstEnergy Nuclear Operating Company Notice of Issuance of Director's Decision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-346; NRC-2010-0253] License No. NPF-3; FirstEnergy Nuclear Operating Company Notice of Issuance of Director's Decision Notice is hereby given that the... Petitioner states that FirstEnergy Nuclear Operating Company (the licensee for DBNPS) has violated Federal...

  20. 78 FR 42587 - Deepwater Port License: Amendment of the Neptune LNG LLC Deepwater Port License and Temporary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... Neptune LNG LLC Deepwater Port License and Temporary Suspension of Operations at the Neptune LNG Deepwater... decision to approve the request of Neptune LNG LLC (Neptune) for a temporary five-year suspension of port operations at the Neptune Deepwater Port by amending the Neptune Deepwater Port License. ADDRESSES: The...

  1. Conceptual design of thermal energy storage systems for near term electric utility applications

    NASA Technical Reports Server (NTRS)

    Hall, E. W.; Hausz, W.; Anand, R.; Lamarche, N.; Oplinger, J.; Katzer, M.

    1979-01-01

    Potential concepts for near term electric utility applications were identified. The most promising ones for conceptual design were evaluated for their economic feasibility and cost benefits. The screening process resulted in selecting two coal-fired and two nuclear plants for detailed conceptual design. The coal plants utilized peaking turbines and the nuclear plants varied the feedwater extraction to change power output. It was shown that the performance and costs of even the best of these systems could not compete in near term utility applications with cycling coal plants and typical gas turbines available for peaking power. Lower electricity costs, greater flexibility of operation, and other benefits can be provided by cycling coal plants for greater than 1500 hours of peaking or by gas turbines for less than 1500 hours if oil is available and its cost does not increase significantly.

  2. 18 CFR 16.21 - Operation of projects with a minor or minor part license not subject to sections 14 and 15 of the...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... with a minor or minor part license not subject to sections 14 and 15 of the Federal Power Act after... TAKEOVER AND RELICENSING OF LICENSED PROJECTS Projects With Minor and Minor Part Licenses Not Subject to Sections 14 and 15 of the Federal Power Act § 16.21 Operation of projects with a minor or minor part...

  3. 18 CFR 16.21 - Operation of projects with a minor or minor part license not subject to sections 14 and 15 of the...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... with a minor or minor part license not subject to sections 14 and 15 of the Federal Power Act after... TAKEOVER AND RELICENSING OF LICENSED PROJECTS Projects With Minor and Minor Part Licenses Not Subject to Sections 14 and 15 of the Federal Power Act § 16.21 Operation of projects with a minor or minor part...

  4. Preserving the Near-Earth Space Environment with Green Engineering and Operations

    NASA Technical Reports Server (NTRS)

    Johnson, Nicholas L.

    2009-01-01

    Green engineering and operations are essential to preserving the near-Earth space environment for future generations. The U.S. and the international aerospace community have been proactive in addressing the threat of the increasing orbital debris population and the risks to people and property from reentering debris. NASA has led this activity first by devoting resources to thoroughly understand the technical issues and then by developing effective and acceptable policies and guidelines. NASA also worked closely with the international community to ensure that the US aerospace industry was not placed at an economic disadvantage. In the long term, the removal of large orbital debris will be essential to the sustainability of space operations.

  5. Chapter 5, "License Renewal and Aging Management for Continued Service

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Naus, Dan J

    As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of themore » license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.« less

  6. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...

  7. 76 FR 50767 - Southern Nuclear Operating Co., et al.; Combined Licenses for Vogtle Electric Generating Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... Limited Work Authorizations AGENCY: Nuclear Regulatory Commission. ACTION: Notice of hearing. SUMMARY: The... Southern Nuclear Operating Company for two combined licenses (COLs) seeking approval to construct and...), as well as for two limited work authorizations (LWAs) to engage in selected construction activities...

  8. 47 CFR 90.185 - Multiple licensing of radio transmitting equipment in the mobile radio service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... frequency(ies) on which the land station operates. (c) If the multiple licensed base station is... the same land station under the following terms and conditions. (a) Each licensee complies with the...

  9. Near-Term Electric Vehicle Program. Phase II: Mid-Term Summary Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1978-08-01

    The Near Term Electric Vehicle (NTEV) Program is a constituent elements of the overall national Electric and Hybrid Vehicle Program that is being implemented by the Department of Energy in accordance with the requirements of the Electric and Hybrid Vehicle Research, Development, and Demonstration Act of 1976. Phase II of the NTEV Program is focused on the detailed design and development, of complete electric integrated test vehicles that incorporate current and near-term technology, and meet specified DOE objectives. The activities described in this Mid-Term Summary Report are being carried out by two contractor teams. The prime contractors for these contractormore » teams are the General Electric Company and the Garrett Corporation. This report is divided into two discrete parts. Part 1 describes the progress of the General Electric team and Part 2 describes the progress of the Garrett team.« less

  10. 27 CFR 478.93 - Authorized operations by a licensed collector.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the licensed collector in curios and relics. The collector's license is of no force or effect and a... disposition as required by § 478.125 (a) and (b). [T.D. ATF-270, 53 FR 10496, Mar. 31, 1988] ...

  11. 27 CFR 478.93 - Authorized operations by a licensed collector.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the licensed collector in curios and relics. The collector's license is of no force or effect and a... disposition as required by § 478.125 (a) and (b). [T.D. ATF-270, 53 FR 10496, Mar. 31, 1988] ...

  12. A Post Licensing Study of Community Effects at Two Operating Nuclear Power Plants. Final Report.

    ERIC Educational Resources Information Center

    Purdy, Bruce J.; And Others

    In an effort to identify and assess the social, economic, and political effects of nuclear power plant construction and operation upon two host communities (Plymouth, Massachusetts and Waterford, Connecticut), a post-licensing review revealed that the primary impact of the nuclear power plants in both communities was an increase in the property…

  13. 47 CFR 90.1307 - Licensing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... licenses will serve as a prerequisite for registering individual fixed and base stations. A licensee cannot operate a fixed or base station before registering it under its license and licensees must delete registrations for unused fixed and base stations. ...

  14. A Short Term Evaluation of the Direct Operating Grants. Final Report.

    ERIC Educational Resources Information Center

    Levy-Coughlin Partnership.

    Findings of a survey of a sample of center-based child care (CBCC) programs and private home day care (PHDC) agencies listed in Ontario's Direct Operating Grant Calculation Data Base are reported. During 1988, licensed child care programs in Ontario received approximately 46.5 million dollars in Direct Operating Grants (DOGs). Grants were…

  15. 77 FR 40647 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... operation of the shared unit's diesel generator (emergency power) and to assure long term operation of the... actuation system limiting safety system settings, and emergency diesel generator surveillance start voltage... specification for the Vogtle Electric Generating Plant, Units 1 and 2, associated with the ``Steam Generator (SG...

  16. A Near-Term, High-Confidence Heavy Lift Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Rothschild, William J.; Talay, Theodore A.

    2009-01-01

    The use of well understood, legacy elements of the Space Shuttle system could yield a near-term, high-confidence Heavy Lift Launch Vehicle that offers significant performance, reliability, schedule, risk, cost, and work force transition benefits. A side-mount Shuttle-Derived Vehicle (SDV) concept has been defined that has major improvements over previous Shuttle-C concepts. This SDV is shown to carry crew plus large logistics payloads to the ISS, support an operationally efficient and cost effective program of lunar exploration, and offer the potential to support commercial launch operations. This paper provides the latest data and estimates on the configurations, performance, concept of operations, reliability and safety, development schedule, risks, costs, and work force transition opportunities for this optimized side-mount SDV concept. The results presented in this paper have been based on established models and fully validated analysis tools used by the Space Shuttle Program, and are consistent with similar analysis tools commonly used throughout the aerospace industry. While these results serve as a factual basis for comparisons with other launch system architectures, no such comparisons are presented in this paper. The authors welcome comparisons between this optimized SDV and other Heavy Lift Launch Vehicle concepts.

  17. Photovoltaic remote instrument applications: Assessment of the near-term market

    NASA Technical Reports Server (NTRS)

    Rosenblum, L.; Scudder, L. R.; Poley, W. A.; Bifano, W. J.

    1977-01-01

    A preliminary assessment of the near term market for photovoltaic remote instrument applications is presented. Among the potential users, two market sectors are considered: government and private. However, the majority of the remote systems studied are operated by or for the federal, state, or local governments. Environmental monitoring and surveillance remote instrument systems are discussed. Based on information obtained in this preliminary market survey, a domestic, civilian market of at least 1.3 MW sub pk is forecast for remote instrument systems. This estimate is exclusive of several potentially large scale markets for remote instruments which are identified but for which no hard data is available.

  18. Orbital and Landing Operations at Near-Earth

    NASA Technical Reports Server (NTRS)

    Scheeres, D. J.

    1995-01-01

    Orbital and landing operations about near-Earth asteroids are different than classical orbital operations about large bodies. The major differences lie with the small mass of the asteroid, the lower orbital velocities, the larger Solar tide and radiation pressure perturbations, the irregular shape of the asteroid and the potential for non-uniform rotation of the asteroid. These differences change the nature of orbits about an asteroid to where it is often common to find trajectories that evolve from stable, near-circular orbits to crashing or escaping orbits in a matter of days. The understanding and control of such orbits is important if a human or robotic presence at asteroids is to be commonplace in the future.

  19. Near-term Forecasting of Solar Total and Direct Irradiance for Solar Energy Applications

    NASA Astrophysics Data System (ADS)

    Long, C. N.; Riihimaki, L. D.; Berg, L. K.

    2012-12-01

    Integration of solar renewable energy into the power grid, like wind energy, is hindered by the variable nature of the solar resource. One challenge of the integration problem for shorter time periods is the phenomenon of "ramping events" where the electrical output of the solar power system increases or decreases significantly and rapidly over periods of minutes or less. Advance warning, of even just a few minutes, allows power system operators to compensate for the ramping. However, the ability for short-term prediction on such local "point" scales is beyond the abilities of typical model-based weather forecasting. Use of surface-based solar radiation measurements has been recognized as a likely solution for providing input for near-term (5 to 30 minute) forecasts of solar energy availability and variability. However, it must be noted that while fixed-orientation photovoltaic panel systems use the total (global) downwelling solar radiation, tracking photovoltaic and solar concentrator systems use only the direct normal component of the solar radiation. Thus even accurate near-term forecasts of total solar radiation will under many circumstances include inherent inaccuracies with respect to tracking systems due to lack of information of the direct component of the solar radiation. We will present examples and statistical analyses of solar radiation partitioning showing the differences in the behavior of the total/direct radiation with respect to the near-term forecast issue. We will present an overview of the possibility of using a network of unique new commercially available total/diffuse radiometers in conjunction with a near-real-time adaptation of the Shortwave Radiative Flux Analysis methodology (Long and Ackerman, 2000; Long et al., 2006). The results are used, in conjunction with persistence and tendency forecast techniques, to provide more accurate near-term forecasts of cloudiness, and both total and direct normal solar irradiance availability and

  20. 47 CFR 87.35 - Cancellation of license.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Cancellation of license. 87.35 Section 87.35 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.35 Cancellation of license. When a station permanently discontinues operation...

  1. 47 CFR 87.35 - Cancellation of license.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Cancellation of license. 87.35 Section 87.35 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.35 Cancellation of license. When a station permanently discontinues operation...

  2. 78 FR 35758 - Drawbridge Operation Regulation; Bishop Cut, Near Stockton, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... Operation Regulation; Bishop Cut, Near Stockton, CA AGENCY: Coast Guard, DHS. ACTION: Notice of deviation... operating regulation that governs the San Joaquin County Highway Bridge across Bishop Cut, mile 1.0, near... Highway Bridge, mile 1.0, over Bishop Cut, near Stockton, CA. The drawbridge navigation span provides a...

  3. Licensing: pros and cons for biotech.

    PubMed

    Villiger, Ralph; Bogdan, Boris

    2009-03-01

    This article guides the reader through strategic considerations when facing the option to license a drug development project. It is crucial to understand these licensing events in their full complexity in order to achieve maximum value for the company and the shareholders, while minimizing risk. First, the nature of various license agreements and the needs of licensor and licensee are discussed. Second, the main strategic issues for the licensor are explained and a guideline, how to come to a decision whether to license and to what terms, is given. Third, the authors explain how to overcome different assumptions when negotiating a license contract.

  4. 47 CFR 5.51 - Eligibility of license.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Eligibility of license. 5.51 Section 5.51...) Applications and Licenses § 5.51 Eligibility of license. (a) Authorizations for stations in the Experimental... for scientific or technical operation data directly related to a use of radio not provided by existing...

  5. Research notes : Oregon teen licensing changes have safety benefits.

    DOT National Transportation Integrated Search

    2007-08-01

    Changes in Oregons teen licensing laws that went into effect in March 2000 significantly strengthened the provisional driver license program, which had been in place since October 1989. Nearly all states and Canadian provinces have some form of a ...

  6. 75 FR 57798 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants Notice is hereby... license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean.../ Treasurer/CFO, (Qualifying Individual). Application Type: New NVO License. World Class Solutions LLC (NVO...

  7. 10 CFR 72.210 - General license issued.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.210 General license issued. A general license is... reactor sites to persons authorized to possess or operate nuclear power reactors under 10 CFR part 50 or...

  8. 10 CFR 72.210 - General license issued.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.210 General license issued. A general license is... reactor sites to persons authorized to possess or operate nuclear power reactors under 10 CFR part 50 or...

  9. 47 CFR 80.13 - Station license required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... individually or by fleet. (b) One ship station license will be granted for operation of all maritime services... be authorized, however, unless specifically requested by the applicant. (c) A ship station is licensed by rule and does not need an individual license issued by the FCC if the ship station is not...

  10. 47 CFR 80.13 - Station license required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... individually or by fleet. (b) One ship station license will be granted for operation of all maritime services... be authorized, however, unless specifically requested by the applicant. (c) A ship station is licensed by rule and does not need an individual license issued by the FCC if the ship station is not...

  11. 47 CFR 80.13 - Station license required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... individually or by fleet. (b) One ship station license will be granted for operation of all maritime services... be authorized, however, unless specifically requested by the applicant. (c) A ship station is licensed by rule and does not need an individual license issued by the FCC if the ship station is not...

  12. 47 CFR 80.13 - Station license required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... individually or by fleet. (b) One ship station license will be granted for operation of all maritime services... be authorized, however, unless specifically requested by the applicant. (c) A ship station is licensed by rule and does not need an individual license issued by the FCC if the ship station is not...

  13. 47 CFR 80.13 - Station license required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... individually or by fleet. (b) One ship station license will be granted for operation of all maritime services... be authorized, however, unless specifically requested by the applicant. (c) A ship station is licensed by rule and does not need an individual license issued by the FCC if the ship station is not...

  14. Environmental assessment proposed license renewal of Nuclear Metals, Inc. Concord, Massachusetts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, R.L.; Easterly, C.E.; Lombardi, C.E.

    1997-02-01

    The US Nuclear Regulatory Commission (NRC) has prepared this Environmental Assessment (EA) to evaluate environmental issues associated with the renewal of licenses issued by NRC for facilities operated by Nuclear Metals, Inc. (NMI) in Concord, Massachusetts. By renewing the licenses, NRC proposes to allow the continuation of ongoing operations involving radioactive materials at NMI`s facilities. This EA focuses on the potential impacts related to air emissions at NMI during normal (incident-free) operations and accidental releases. Findings indicate that there are only two areas of potential concern. First, modeling results for sulfur dioxide (SO{sub 2}) emissions from the boilers during normalmore » operations indicate that the potential exists for exceeding the short-term National Ambient Air Quality Standards (NAAQS). NMI is prepared to undertake mitigative action to prevent potential exceedances of the short-term SO{sub 2} NAAQS, and the Massachusetts Department of Environmental Protection is prepared to resolve the issue via a permit/approval change or through a Consent Order. Second, in the unlikely event of a severe fire, predicted sulfuric acid (H{sub 2}SO{sub 4}) concentrations based on conservative (upper bound) modeling exceed the Emergency Response Planning Guideline (ERPG) levels. NMI has committed to NRC to give a briefing for local emergency response officials regarding the potential for an accidental H{sub 2}SO{sub 4} release.« less

  15. 47 CFR 90.1207 - Licensing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... license gives the licensee authority to construct and operate any number of base stations anywhere within the area authorized by the license, except as follows: (1) A station is required to be individually... assessment is required under § 1.1307 of this chapter; or (iii) The station would affect areas identified in...

  16. 75 FR 60124 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants Notice is hereby... license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean..., Application Type: New OFF License Myunghe Choi dba World Express Shipping (NVO), 4733 Torrance Blvd., 187...

  17. Licensed operating reactors: Status summary report data as of December 31, 1991. Volume 16

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-03-01

    The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1991) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1more » capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.« less

  18. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1more » capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.« less

  19. 47 CFR 13.17 - Replacement license.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Replacement license. 13.17 Section 13.17 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement license. (a) Each licensee or permittee whose original document is lost, mutilated, or destroyed must...

  20. 47 CFR 13.9 - Eligibility and application for new license or endorsement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS... Operator License, Marine Radio Operator Permit, First Class Radiotelegraph Operator's Certificate, Second... Restricted Radiotelephone Operator Permit or a Restricted Radiotelephone Operator Permit-Limited Use must be...

  1. 10 CFR 40.71 - Modification and revocation of licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Modification and revocation of licenses. 40.71 Section 40.71 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL Modification and Revocation of Licenses § 40.71 Modification and revocation of licenses. (a) The terms and conditions of each...

  2. 76 FR 34992 - Ocean Transportation Intermediary License; Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License; Applicants Notice is hereby... license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean... License Echo Trans World, Inc. (NVO), 462 7th Avenue, 14th Floor, New York, NY 10018, Officer: Moshe...

  3. A comparison of licensed and un-licensed artisanal and small-scale gold miners (ASGM) in terms of socio-demographics, work profiles, and injury rates.

    PubMed

    Calys-Tagoe, Benedict N L; Clarke, Edith; Robins, Thomas; Basu, Niladri

    2017-11-06

    Artisanal and small-scale gold mining (ASGM) represents one of the most hazardous work environments. While formalization of this sector has been suggested (e.g., Minamata Convention) as a means to improve working conditions, we are unaware of empirical evidence that supports this notion. This study aimed to compare sociodemographic profiles, work profiles, and injury rates among miners working in licensed versus un-licensed ASGM sites. In the Tarkwa mining region of Ghana, 404 small-scale miners were recruited in 2014 and interviewed regarding their occupational injury experiences over the preceding 10 years. Workers were drawn from 9 mining sites, of which 5 were licensed and 4 were not licensed. Sociodemographic characteristics of miners from the two groups were relatively similar. Those currently working in an un-licensed mine have spent more time in the ASGM sector than those currently working in a licensed mine (94 vs. 70 months). Miners working in an un-licensed site tended to experience more injury episodes (e.g., 26% vs. 8% had 3 or more injury events) and not use personal protective equipment during the time of an injury (92% indicated to not using vs. 73%) when compared to miners working in a licensed site. A total of 121 injury episodes were recorded for 2245 person years of ASGM work. The injury rate for those working in un-licensed mines was 5.9 per 100 person years (59 injuries in 995 person years) versus 5.0 (62 injuries in 1250 person-years) in the licensed mines. When focusing on the male miners, there was a significant difference in injury rates between those working in a licensed mine (4.2 per 100 person years) versus an un-licensed mine (6.1 per 100 person years). These findings advance our understanding of injuries amongst ASGM workers, and help identify important differences in socio-demographics, work profiles, and injury rates between miners working in a licensed versus and un-licensed site. The findings suggest that certain working

  4. An Examination of Selected Datacom Options for the Near-Term Implementation of Trajectory Based Operations

    NASA Technical Reports Server (NTRS)

    Johnson, Walter W.; Lachter, Joel B.; Battiste, Vernol; Lim, Veranika; Brandt, Summer L.; Koteskey, Robert W.; Dao, Arik-Quang V.; Ligda, Sarah V.; Wu, Shu-Chieh

    2011-01-01

    A primary feature of the Next Generation Air Transportation System (NextGen) is trajectory based operations (TBO). Under TBO, aircraft flight plans are known to computer systems on the ground that aid in scheduling and separation. The Future Air Navigation System (FANS) was developed to support TBO, but relatively few aircraft in the US are FANSequipped. Thus, any near-term implementation must provide TBO procedures for non-FANS aircraft. Previous research has explored controller clearances, but any implementation must also provide procedures for aircraft requests. The work presented here aims to surface issues surrounding TBO communication procedures for non-FANS aircraft and for aircraft requesting deviations around weather. Three types of communication were explored: Voice, FANS, and ACARS,(Aircraft Communications Addressing and Reporting System). ACARS and FANS are datacom systems that differ in that FANS allows uplinked flight plans to be loaded into the Flight Management System (FMS), while ACARS delivers flight plans as text that must be entered manually via the Control Display Unit (CDU). Sixteen pilots (eight two-person flight decks) and four controllers participated in 32 20-minute scenarios that required the flight decks to navigate through convective weather as they approached their top of descents (TODs). Findings: The rate of non-conformance was higher than anticipated, with aircraft off path more than 20% of the time. Controllers did not differentiate between the ACARS and FANS datacom, and were mixed in their preference for Voice vs. datacom (ACARS and FANS). Pilots uniformly preferred Voice to datacom, particularly ACARS. Much of their dislike appears to result from the slow response times in the datacom conditions. As a result, participants frequently resorted to voice communication. These results imply that, before implementing TBO in environments where pilots make weather deviation requests, further research is needed to develop communication

  5. 76 FR 58311 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... nuclear power plants. In response to a request from the Nuclear Energy Institute (NEI), the NRC is... NUCLEAR REGULATORY COMMISSION [NRC-2011-0191] Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Draft...

  6. 31 CFR 510.305 - Licenses; general and specific.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance:Treasury 3 2013-07-01 2013-07-01 false Licenses; general and specific. 510.305 Section 510.305 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued... Definitions § 510.305 Licenses; general and specific. (a) Except as otherwise specified, the term license...

  7. 31 CFR 510.305 - Licenses; general and specific.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 3 2011-07-01 2011-07-01 false Licenses; general and specific. 510.305 Section 510.305 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued... Definitions § 510.305 Licenses; general and specific. (a) Except as otherwise specified, the term license...

  8. 31 CFR 510.305 - Licenses; general and specific.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance:Treasury 3 2014-07-01 2014-07-01 false Licenses; general and specific. 510.305 Section 510.305 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued... Definitions § 510.305 Licenses; general and specific. (a) Except as otherwise specified, the term license...

  9. Licensing and Negotiations for Electronic Content

    ERIC Educational Resources Information Center

    Crawford, Amy R.

    2008-01-01

    This article provides an overview of the basic characteristics of database, or eContent, license agreements, defines general licensing terms, maps the anatomy of an electronic resources subscription agreement, and discusses negotiating skills and techniques for library staff. (Contains a list of additional resources and a sample agreement.)

  10. Iterative near-term ecological forecasting: Needs, opportunities, and challenges

    USGS Publications Warehouse

    Dietze, Michael C.; Fox, Andrew; Beck-Johnson, Lindsay; Betancourt, Julio L.; Hooten, Mevin B.; Jarnevich, Catherine S.; Keitt, Timothy H.; Kenney, Melissa A.; Laney, Christine M.; Larsen, Laurel G.; Loescher, Henry W.; Lunch, Claire K.; Pijanowski, Bryan; Randerson, James T.; Read, Emily; Tredennick, Andrew T.; Vargas, Rodrigo; Weathers, Kathleen C.; White, Ethan P.

    2018-01-01

    Two foundational questions about sustainability are “How are ecosystems and the services they provide going to change in the future?” and “How do human decisions affect these trajectories?” Answering these questions requires an ability to forecast ecological processes. Unfortunately, most ecological forecasts focus on centennial-scale climate responses, therefore neither meeting the needs of near-term (daily to decadal) environmental decision-making nor allowing comparison of specific, quantitative predictions to new observational data, one of the strongest tests of scientific theory. Near-term forecasts provide the opportunity to iteratively cycle between performing analyses and updating predictions in light of new evidence. This iterative process of gaining feedback, building experience, and correcting models and methods is critical for improving forecasts. Iterative, near-term forecasting will accelerate ecological research, make it more relevant to society, and inform sustainable decision-making under high uncertainty and adaptive management. Here, we identify the immediate scientific and societal needs, opportunities, and challenges for iterative near-term ecological forecasting. Over the past decade, data volume, variety, and accessibility have greatly increased, but challenges remain in interoperability, latency, and uncertainty quantification. Similarly, ecologists have made considerable advances in applying computational, informatic, and statistical methods, but opportunities exist for improving forecast-specific theory, methods, and cyberinfrastructure. Effective forecasting will also require changes in scientific training, culture, and institutions. The need to start forecasting is now; the time for making ecology more predictive is here, and learning by doing is the fastest route to drive the science forward.

  11. Iterative near-term ecological forecasting: Needs, opportunities, and challenges.

    PubMed

    Dietze, Michael C; Fox, Andrew; Beck-Johnson, Lindsay M; Betancourt, Julio L; Hooten, Mevin B; Jarnevich, Catherine S; Keitt, Timothy H; Kenney, Melissa A; Laney, Christine M; Larsen, Laurel G; Loescher, Henry W; Lunch, Claire K; Pijanowski, Bryan C; Randerson, James T; Read, Emily K; Tredennick, Andrew T; Vargas, Rodrigo; Weathers, Kathleen C; White, Ethan P

    2018-02-13

    Two foundational questions about sustainability are "How are ecosystems and the services they provide going to change in the future?" and "How do human decisions affect these trajectories?" Answering these questions requires an ability to forecast ecological processes. Unfortunately, most ecological forecasts focus on centennial-scale climate responses, therefore neither meeting the needs of near-term (daily to decadal) environmental decision-making nor allowing comparison of specific, quantitative predictions to new observational data, one of the strongest tests of scientific theory. Near-term forecasts provide the opportunity to iteratively cycle between performing analyses and updating predictions in light of new evidence. This iterative process of gaining feedback, building experience, and correcting models and methods is critical for improving forecasts. Iterative, near-term forecasting will accelerate ecological research, make it more relevant to society, and inform sustainable decision-making under high uncertainty and adaptive management. Here, we identify the immediate scientific and societal needs, opportunities, and challenges for iterative near-term ecological forecasting. Over the past decade, data volume, variety, and accessibility have greatly increased, but challenges remain in interoperability, latency, and uncertainty quantification. Similarly, ecologists have made considerable advances in applying computational, informatic, and statistical methods, but opportunities exist for improving forecast-specific theory, methods, and cyberinfrastructure. Effective forecasting will also require changes in scientific training, culture, and institutions. The need to start forecasting is now; the time for making ecology more predictive is here, and learning by doing is the fastest route to drive the science forward.

  12. 36 CFR 264.3 - Licensing for commercial use.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Licensing for commercial use... PROPERTY MANAGEMENT Official Forest Service Insignia § 264.3 Licensing for commercial use. (a) Each commercial license granted for the use of the insignia or likeness thereof shall contain the following terms...

  13. Photovoltaic highway applications: Assessment of the near-term market

    NASA Technical Reports Server (NTRS)

    Rosenblum, L.; Scudder, L. R.; Bifano, W. J.; Poley, W. A.

    1977-01-01

    A preliminary assessment of the near-term market for photovoltaic highway applications is presented. Among the potential users, two market sectors are considered: government and commercial. Within these sectors, two possible application areas, signs and motorist aids, are discussed. Based on judgemental information, obtained by a brief survey of representatives of the two user sectors, the government sector appears more amenable to the introduction of photovoltaic power sources for highway applications in the near-term. However, considerable interest and potential opportunities were also found to exist in the commercial sector. Further studies to quantify the market for highway applications appear warranted.

  14. 47 CFR 25.121 - License term and renewals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... specified in the instrument of authorization. (d) Space stations. (1) For geostationary-orbit space stations... authorization. (2) For non-geostationary orbit space stations, the license period will begin at 3 a.m. Eastern... system replacement authorization for non-geostationary orbit satellites shall be filed no earlier than 90...

  15. 10 CFR 34.11 - Application for a specific license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Specific Licensing Provisions § 34.11 Application for a... industrial radiography on NRC Form 313, “Application for Material License,” in accordance with the provisions...

  16. 10 CFR 34.11 - Application for a specific license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Specific Licensing Provisions § 34.11 Application for a... industrial radiography on NRC Form 313, “Application for Material License,” in accordance with the provisions...

  17. 10 CFR 34.11 - Application for a specific license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Specific Licensing Provisions § 34.11 Application for a... industrial radiography on NRC Form 313, “Application for Material License,” in accordance with the provisions...

  18. 10 CFR 34.11 - Application for a specific license.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Specific Licensing Provisions § 34.11 Application for a... industrial radiography on NRC Form 313, “Application for Material License,” in accordance with the provisions...

  19. 10 CFR 34.11 - Application for a specific license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Specific Licensing Provisions § 34.11 Application for a... industrial radiography on NRC Form 313, “Application for Material License,” in accordance with the provisions...

  20. 47 CFR 74.832 - Licensing requirements and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Stations § 74.832 Licensing requirements and procedures. (a) A license authorizing operation of one or more low power auxiliary stations will be issued only to the following: (1) A licensee of an AM, FM, TV, or International broadcast station or low power TV station. Low power auxiliary stations will be licensed for used...

  1. 47 CFR 74.832 - Licensing requirements and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Stations § 74.832 Licensing requirements and procedures. (a) A license authorizing operation of one or more low power auxiliary stations will be issued only to the following: (1) A licensee of an AM, FM, TV, or International broadcast station or low power TV station. Low power auxiliary stations will be licensed for used...

  2. 47 CFR 74.832 - Licensing requirements and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Stations § 74.832 Licensing requirements and procedures. (a) A license authorizing operation of one or more low power auxiliary stations will be issued only to the following: (1) A licensee of an AM, FM, TV, or International broadcast station or low power TV station. Low power auxiliary stations will be licensed for used...

  3. 47 CFR 74.832 - Licensing requirements and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Stations § 74.832 Licensing requirements and procedures. (a) A license authorizing operation of one or more low power auxiliary stations will be issued only to the following: (1) A licensee of an AM, FM, TV, or International broadcast station or low power TV station. Low power auxiliary stations will be licensed for used...

  4. 47 CFR 74.832 - Licensing requirements and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Stations § 74.832 Licensing requirements and procedures. (a) A license authorizing operation of one or more low power auxiliary stations will be issued only to the following: (1) A licensee of an AM, FM, TV, or International broadcast station or low power TV station. Low power auxiliary stations will be licensed for used...

  5. 10 CFR 60.41 - Standards for issuance of a license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REPOSITORIES Licenses License Issuance and Amendment § 60.41 Standards for issuance of a license. A license to receive and possess source, special nuclear, or byproduct material at a geologic repository operations area may be issued by the Commission upon finding that: (a) Construction of the geologic repository...

  6. 10 CFR 81.32 - Terms of exclusive license grant.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commission a written notice of the Commission's intention to modify or revoke the license, and the licensee... other books, documents, papers, and records pertaining to such suit. If, as a result of any such...

  7. 47 CFR 13.13 - Application for a renewed or modified license.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 13.13 Section 13.13 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO... operator class must be filed on FCC Form 605. Each application for a commercial operator license involving... a period of 1 year. (d) Provided that a person's commercial radio operator license was not revoked...

  8. Guide for the preparation of applications for Nuclear Pharmacy Licenses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-08-01

    The purpose of this regulatory guide is to provide assistance to applicants and licensees in preparing applications for new licenses, license amendments, and license renewals for the possession, use, and distribution of by-product material in nuclear pharmacy operations.

  9. Opportunistic tri-band carrier aggregation in licensed spectrum for multi-operator 5G hetnet

    NASA Astrophysics Data System (ADS)

    Maksymuk, Taras; Kyryk, Maryan; Klymash, Mykhailo; Jo, Minho; Romaniuk, Ryszard; Kotyra, Andrzej; Zhanpeisova, Aizhan; Kozbekova, Ainur

    2017-08-01

    Increasing capacity of mobile networks is a real challenge due to rapid increasing of traffic demands and spectrum scarcity. Carrier aggregation technology is aimed to increase the user data rate by combining the throughput of few spectrum bands, even if they are not physically collocated. Utilization of unlicensed Wi-Fi 5 GHz band for mobile transmission opens new perspectives for carrier aggregation due to vast amount of spectrum range, which can be available for aggregation to supplement data rates for end users. There are many solutions proposed to enable mobile data transmission in unlicensed band without disturbing interference for the existing Wi-Fi users. The paper presents a new approach for opportunistic carrier aggregation in licensed and unlicensed band for multi-operator 5G network. It allows multiple network operators to utilize unlicensed spectrum opportunistically if it is not currently used by Wi-Fi or other mobile network operators. Performance of the proposed approach has been simulated in case of two competing operators. Simulation results reveal that applying the proposed method ensures achieving satisfactory performance of carrier aggregation for the case of two network operators.

  10. Your EHR license agreement: critical issues.

    PubMed

    Shay, Daniel F

    2014-01-01

    This article discusses several key provisions and concepts in software license agreements for electronic health records. It offers insight into what physician practices can expect to find in their license agreements, as well as practical advice on beneficial provisions. The article examines contractual language relating to term and termination, technical specifications and support, and compliance with governmental programs.

  11. 13 CFR 107.1900 - Surrender of license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Surrender of license. 107.1900 Section 107.1900 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS INVESTMENT COMPANIES Ending Operations as a Licensee § 107.1900 Surrender of license. You may not surrender your...

  12. Preliminary results of steady state characterization of near term electric vehicle breadboard propulsion system

    NASA Technical Reports Server (NTRS)

    Sargent, N. B.

    1980-01-01

    The steady state test results on a breadboard version of the General Electric Near Term Electric Vehicle (ETV-1) are discussed. The breadboard was built using exact duplicate vehicle propulsion system components with few exceptions. Full instrumentation was provided to measure individual component efficiencies. Tests were conducted on a 50 hp dynamometer in a road load simulator facility. Characterization of the propulsion system over the lower half of the speed-torque operating range has shown the system efficiency to be composed of a predominant motor loss plus a speed dependent transaxle loss. At the lower speeds with normal road loads the armature chopper loss is also a significant factor. At the conditions corresponding to a cycle for which the vehicle system was specifically designed, the efficiencies are near optimum.

  13. 77 FR 52736 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...

  14. 77 FR 58378 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...

  15. 78 FR 50054 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...

  16. 78 FR 56229 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-12

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...

  17. 77 FR 43599 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-25

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...

  18. 78 FR 53456 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...

  19. 78 FR 23252 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-18

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...

  20. 78 FR 3424 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-16

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...

  1. 78 FR 33841 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-05

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...

  2. 78 FR 69852 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-21

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...

  3. Photovoltaic village power application: assessment of the near-term market

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosenblum, L.; Bifano, W.J.; Poley, W.A.

    1978-01-01

    A preliminary assessment of the near-term market for photovoltaic village power applications is presented. One of the objectives of the Department of Energy's (DOE) National Photovoltaic Program is to stimulate the demand for photovoltaic power systems so that appropriate markets will be developed in the near-term to support the increasing photovoltaic production capacity also being developed by DOE. The village power application represents such a potential market for photovoltaics. The price of energy for photovoltaic systems is compared to that of utility line extensions and diesel generators. The potential ''domestic''' demand (including the 50 states of the union plus themore » areas under legal control of the U.S. government) is defined in both the goverment and commercial sectors. The foreign demand and sources of funding for village power systems in the developing countries are also discussed briefly. It is concluded that a near-term domestic market of at least 12 MW (peak) and a foreign market of about 10 GW (peak) exists and that significant market penetration should be possible beginning in the 1981--82 period.« less

  4. Drug safety assurance through clinical genotyping: near-term considerations for a system-wide implementation of personalized medicine.

    PubMed

    Kane, Michael D; Springer, John A; Sprague, Jon E

    2008-07-01

    The rationale and overall system-wide behavior of a clinical genotyping information system (both DNA analysis and data management) requires a near-term, scalable approach, which is emerging in the focused implementation of pharmacogenomics and drug safety assurance. The challenges to implementing a successful clinical genotyping system are described, as are how the benefits of a focused, near-term system for drug safety assessment and assurance overcome the logistical and operational challenges that perpetually hinder the development of a societal-scale clinical genotyping system. This rationale is based on the premise that a focused application domain for clinical genotyping, specifically drug safety assurance, provides a transition paradigm for both professionals and consumers of healthcare, thereby facilitating the movement of genotyping from bench to bedside and paving the way for the adoption of prognostic and diagnostic applications in clinical genomics.

  5. 30 CFR 285.638 - What must I do upon completion of my commercial operations as approved in my COP or FERC license?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations as approved in my COP or FERC license? 285.638 Section 285.638 Mineral Resources MINERALS... FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Activities Under An Approved Cop § 285.638 What must I do upon completion of my commercial operations as approved in my COP or FERC...

  6. 14 CFR 420.17 - Bases for issuance of a license.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Bases for issuance of a license. 420.17 Section 420.17 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements...

  7. 77 FR 26008 - Ocean Transportation Intermediary License; Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License; Applicants Notice is hereby... license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean... Consulting LLC dba World, Maritime NVOCC (OFF), 2081 Raritan Road, Scotch Plains, NJ 07076, Officers: Robin...

  8. 76 FR 27643 - Ocean Transportation Intermediary License; Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License; Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean...

  9. 77 FR 5013 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean...

  10. Effect of an Education Presentation On the Knowledge and Awareness of Urinary Tract Infection among Non-Licensed and Licensed Health Care Workers in Long-Term Care Facilities.

    PubMed

    Freeman-Jobson, Jennifer H; Rogers, Jamie L; Ward-Smith, Peggy

    2016-01-01

    This article presents the findings of a pre-test, post-test quality improvement project that describes the change in knowledge from prior to and following an evidence-based education presentation. The presentation addressed the clinical symptoms, diagnostic processes, interventions, and responsibilities of licensed and unlicensed health care workers employed in long-term care facilities related to prevention and detection of non-catheter-related urinary tract infections. Results indicate that the education presentation improved knowledge in specific.

  11. 30 CFR 585.638 - What must I do upon completion of my commercial operations as approved in my COP or FERC license?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operations as approved in my COP or FERC license? 585.638 Section 585.638 Mineral Resources BUREAU OF OCEAN... FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Activities Under An Approved Cop § 585.638 What must I do upon completion of my commercial operations as approved in my COP or FERC...

  12. 30 CFR 585.638 - What must I do upon completion of my commercial operations as approved in my COP or FERC license?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operations as approved in my COP or FERC license? 585.638 Section 585.638 Mineral Resources BUREAU OF OCEAN... FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Activities Under An Approved Cop § 585.638 What must I do upon completion of my commercial operations as approved in my COP or FERC...

  13. 30 CFR 585.638 - What must I do upon completion of my commercial operations as approved in my COP or FERC license?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operations as approved in my COP or FERC license? 585.638 Section 585.638 Mineral Resources BUREAU OF OCEAN... FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Activities Under An Approved Cop § 585.638 What must I do upon completion of my commercial operations as approved in my COP or FERC...

  14. Near-roadway monitoring of vehicle emissions as a function of mode of operation for light-duty vehicles.

    PubMed

    Wen, Dongqi; Zhai, Wenjuan; Xiang, Sheng; Hu, Zhice; Wei, Tongchuan; Noll, Kenneth E

    2017-11-01

    Determination of the effect of vehicle emissions on air quality near roadways is important because vehicles are a major source of air pollution. A near-roadway monitoring program was undertaken in Chicago between August 4 and October 30, 2014, to measure ultrafine particles, carbon dioxide, carbon monoxide, traffic volume and speed, and wind direction and speed. The objective of this study was to develop a method to relate short-term changes in traffic mode of operation to air quality near roadways using data averaged over 5-min intervals to provide a better understanding of the processes controlling air pollution concentrations near roadways. Three different types of data analysis are provided to demonstrate the type of results that can be obtained from a near-roadway sampling program based on 5-min measurements: (1) development of vehicle emission factors (EFs) for ultrafine particles as a function of vehicle mode of operation, (2) comparison of measured and modeled CO 2 concentrations, and (3) application of dispersion models to determine concentrations near roadways. EFs for ultrafine particles are developed that are a function of traffic volume and mode of operation (free flow and congestion) for light-duty vehicles (LDVs) under real-world conditions. Two air quality models-CALINE4 (California Line Source Dispersion Model, version 4) and AERMOD (American Meteorological Society/U.S. Environmental Protection Agency Regulatory Model)-are used to predict the ultrafine particulate concentrations near roadways for comparison with measured concentrations. When using CALINE4 to predict air quality levels in the mixing cell, changes in surface roughness and stability class have no effect on the predicted concentrations. However, when using AERMOD to predict air quality in the mixing cell, changes in surface roughness have a significant impact on the predicted concentrations. The paper provides emission factors (EFs) that are a function of traffic volume and mode of

  15. 75 FR 31438 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-03

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants Notice is hereby... application for a license as a Non- Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean Transportation Intermediary (OTI) pursuant to section 19 of the Shipping Act of 1984 as amended...

  16. Time-domain near-field/near-field transform with PWS operations

    NASA Astrophysics Data System (ADS)

    Ravelo, B.; Liu, Y.; Slama, J. Ben Hadj

    2011-03-01

    This article deals with the development of computation method dedicated to the extraction of the transient EM-near-field at certain distance from the given 2D data for the baseband application up to GHz. As described in the methodological analysis, it is based on the use of fft combined with the plane wave spectrum (PWS) operation. In order to verify the efficiency of the introduced method, a radiating source formed by the combination of electric dipoles excited by a short duration transient pulse current with a spectrum bandwidth of about 5 GHz is considered. It was shown that compared to the direct calculation, one gets the same behaviors of magnetic near-field components Hx, Hy and Hz with the presented extraction method, in the planes placed at {3 mm, 8 mm, 13 mm} of the initial reference plane. To confirm the relevance of the proposed transform, validation with a standard commercial tool was performed. In future, we envisage to exploit the proposed computation method to predict the transient electromagnetic (EM) field emissions notably in the microwave electronic devices for the EMC applications.

  17. 77 FR 27457 - Ocean Transportation Intermediary License; Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-10

    ... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License; Applicants Notice is hereby... license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean... at (202) 523-5843 or by email at [email protected] . DTS World Cargo Services, Inc. dba DTS World Cargo...

  18. 77 FR 24712 - Ocean Transportation Intermediary License; Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-25

    ... Global Logistics LLC (OFF), 9816 Whithorn Drive, Suite B, Houston, TX 77095, Officer: Herbert R. Hogg, Operating Manager (Qualifying Individual), Application Type: New OFF License. Toyo Logistics America, Inc... Individual), Application Type: New NVO License. Choiceone Logistics, Inc. (NVO & OFF), 10025 NW 116th Way, 17...

  19. Attention Problems, Phonological Short-Term Memory, and Visuospatial Short-Term Memory: Differential Effects on Near- and Long-Term Scholastic Achievement

    ERIC Educational Resources Information Center

    Sarver, Dustin E.; Rapport, Mark D.; Kofler, Michael J.; Scanlan, Sean W.; Raiker, Joseph S.; Altro, Thomas A.; Bolden, Jennifer

    2012-01-01

    The current study examined individual differences in children's phonological and visuospatial short-term memory as potential mediators of the relationship among attention problems and near- and long-term scholastic achievement. Nested structural equation models revealed that teacher-reported attention problems were associated negatively with…

  20. Near-Term Fetuses Process Temporal Features of Speech

    ERIC Educational Resources Information Center

    Granier-Deferre, Carolyn; Ribeiro, Aurelie; Jacquet, Anne-Yvonne; Bassereau, Sophie

    2011-01-01

    The perception of speech and music requires processing of variations in spectra and amplitude over different time intervals. Near-term fetuses can discriminate acoustic features, such as frequencies and spectra, but whether they can process complex auditory streams, such as speech sequences and more specifically their temporal variations, fast or…

  1. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant... that the applicant wishes to have the application considered under 10 CFR part 52, appendix N, and must...

  2. Effect of umbilical cord milking in term and near term infants: randomized control trial.

    PubMed

    Upadhyay, Amit; Gothwal, Sunil; Parihar, Rajeshwari; Garg, Amit; Gupta, Abhilasha; Chawla, Deepak; Gulati, Ish K

    2013-02-01

    The objective of the study was to investigate the effect of umbilical cord milking as compared with early cord clamping on hematological parameters at 6 weeks of age among term and near term neonates. This was a randomized control trial. Eligible neonates (>35 weeks' gestation) were randomized in intervention and control groups (100 each). Neonates of both groups got early cord clamping (within 30 seconds). The cord of the experimental group was milked after cutting and clamping at 25 cm from the umbilicus, whereas in control group cord was clamped near (2-3 cm) the umbilicus and not milked. Both groups got similar routine care. Unpaired Student t and Fisher exact tests were used for statistical analysis. Baseline characteristics were comparable in the 2 groups. Mean hemoglobin (Hgb) (11.9 [1.5] g/dL and mean serum ferritin 355.9 [182.6] μg/L) were significantly higher in the intervention group as compared with the control group (10.8 [0.9] g/dL and 177.5 [135.8] μg/L), respectively, at 6 weeks of age. The mean Hgb and hematocrit at 12 hours and 48 hours was significantly higher in intervention group (P = .0001). The mean blood pressure at 30 minutes, 12 hours, and 48 hours after birth was significantly higher but within normal range. No significant difference was observed in the heart rate, respiratory rate, polycythemia, serum bilirubin, and need of phototherapy in the 2 groups. Umbilical cord milking is a safe procedure and it improved Hgb and iron status at 6 weeks of life among term and near term neonates. Copyright © 2013 Mosby, Inc. All rights reserved.

  3. 10 CFR 50.57 - Issuance of operating license. 1

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...

  4. 10 CFR 50.57 - Issuance of operating license. 1

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...

  5. 10 CFR 50.57 - Issuance of operating license. 1

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...

  6. 10 CFR 50.57 - Issuance of operating license. 1

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...

  7. 10 CFR 50.57 - Issuance of operating license. 1

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...

  8. Integrating a Trusted Computing Base Extension Server and Secure Session Server into the LINUX Operating System

    DTIC Science & Technology

    2001-09-01

    Readily Available Linux has been copyrighted under the terms of the GNU General Public 5 License (GPL)1. This is a license written by the Free...GNOME and KDE . d. Portability Linux is highly compatible with many common operating systems. For...using suitable libraries, Linux is able to run programs written for other operating systems. [Ref. 8] 1 The GNU Project is coordinated by the

  9. 30 CFR 57.12071 - Movement or operation of equipment near high-voltage powerlines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement or operation of equipment near high-voltage powerlines. 57.12071 Section 57.12071 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION...-voltage powerlines. When equipment must be moved or operated near energized high-voltage powerlines (other...

  10. 10 CFR Appendix B to Subpart A of... - Environmental Effect of Renewing the Operating License of a Nuclear Power Plant

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...). Aquatic Ecology (for all plants) Refurbishment 1 SMALL. During plant shutdown and refurbishment there will... cooling ponds and is not expected to be a problem during the license renewal term. Aquatic Ecology (for...)(ii)(B). Aquatic Ecology (for plants with cooling-tower-based heat dissipation systems) Entrainment of...

  11. 10 CFR 60.3 - License required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES General... byproduct material at a geologic repository operations area except as authorized by a license issued by the Commission pursuant to this part. (b) DOE shall not commence construction of a geologic repository operations...

  12. 7 CFR 4290.2000 - Operational Assistance Grants to RBICs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulatory Capital raised by the RBIC at the time of licensing or $1,000,000. (d) Term. Operational... Smaller Enterprises to which it either has made, or expects to make, a Financing. (c) Amount of grant...

  13. Nuclear Regulatory Commission activities to prepare for reviewing license applications and issuing licenses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Uleck, R.B.; DeFino, C.V.

    1991-12-31

    The Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA) assigned States the responsibility to provide for disposal of commercial low-level radioactive waste (LLRW) by 1993. The LLRWPAA also required the US Nuclear Regulatory Commission (NRC) to establish procedures and develop the technical review capability to process license applications for new LLRW disposal facilities. Under the LLRWPAA, NRC is required, to the extent practicable, to complete its review of an LLRW disposal facility license application within 15 months of its submittal by a State. This provision of the LLRWPAA helps ensure that NRC, in addition to protecting public health andmore » safety and the environment, facilitates States` achievement of LLRWPAA milestones for new facility development. A timely NRC review is needed for States to accomplish their objective of having new disposal facilities in operation on the dates prescribed in the LLRWPAA. To help assure NRC and States` compliance with the provisions of the LLRWPAA, NRC has developed a licensing review strategy that includes: (1) the further development of regulatory guidance, (2) enhancement of licensing review capability, and (3) prelicensing regulatory consultation with potential applicants.« less

  14. 47 CFR 80.53 - Application for a portable ship station license.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable ship station license... a portable ship station license. The Commission may grant a license permitting operation of a portable ship station aboard different vessels of the United States. [63 FR 68956, Dec. 14, 1998] ...

  15. 47 CFR 80.53 - Application for a portable ship station license.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Application for a portable ship station license... a portable ship station license. The Commission may grant a license permitting operation of a portable ship station aboard different vessels of the United States. [63 FR 68956, Dec. 14, 1998] ...

  16. 47 CFR 80.53 - Application for a portable ship station license.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Application for a portable ship station license... a portable ship station license. The Commission may grant a license permitting operation of a portable ship station aboard different vessels of the United States. [63 FR 68956, Dec. 14, 1998] ...

  17. 47 CFR 80.53 - Application for a portable ship station license.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Application for a portable ship station license... a portable ship station license. The Commission may grant a license permitting operation of a portable ship station aboard different vessels of the United States. [63 FR 68956, Dec. 14, 1998] ...

  18. 47 CFR 80.53 - Application for a portable ship station license.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Application for a portable ship station license... a portable ship station license. The Commission may grant a license permitting operation of a portable ship station aboard different vessels of the United States. [63 FR 68956, Dec. 14, 1998] ...

  19. 47 CFR 13.9 - Eligibility and application for new license or endorsement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... endorsement. 13.9 Section 13.9 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO..., the following persons are eligible to apply for commercial radio operator licenses: (1) Any person..., no person shall be eligible to be issued a commercial radio operator license when (i) The person's...

  20. 75 FR 4560 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... license as a Non-Vessel-Operating Common Carrier and Ocean Freight Forwarder--Ocean Transportation..., DC 20573. Non-Vessel-Operating Common Carrier--Ocean Transportation Intermediary Applicants: Doma... (Qualifying Individual), Rafia S. Waheed, President. Non-Vessel-Operating Common Carrier and Ocean Freight...

  1. Large Engine Technology Program. Task 21: Rich Burn Liner for Near Term Experimental Evaluations

    NASA Technical Reports Server (NTRS)

    Hautman, D. J.; Padget, F. C.; Kwoka, D.; Siskind, K. S.; Lohmann, R. P.

    2005-01-01

    The objective of the task reported herein, which was conducted as part of the NASA sponsored Large Engine Technology program, was to define and evaluate a near-term rich-zone liner construction based on currently available materials and fabrication processes for a Rich-Quench-Lean combustor. This liner must be capable of operation at the temperatures and pressures of simulated HSCT flight conditions but only needs sufficient durability for limited duration testing in combustor rigs and demonstrator engines in the near future. This must be achieved at realistic cooling airflow rates since the approach must not compromise the emissions, performance, and operability of the test combustors, relative to the product engine goals. The effort was initiated with an analytical screening of three different liner construction concepts. These included a full cylinder metallic liner and one with multiple segments of monolithic ceramic, both of which incorporated convective cooling on the external surface using combustor airflow that bypassed the rich zone. The third approach was a metallic platelet construction with internal convective cooling. These three metal liner/jacket combinations were tested in a modified version of an existing Rich-Quench-Lean combustor rig to obtain data for heat transfer model refinement and durability verification.

  2. AVC/H.264 patent portfolio license

    NASA Astrophysics Data System (ADS)

    Horn, Lawrence A.

    2004-11-01

    MPEG LA, LLC recently announced terms of a joint patent license for the AVC (a/k/a H.264) Standard (ISO/IEC IS 14496-10: Information technology -- Coding of audio-visual objects -- Part 10: Advanced Video Coding | ITU-T Rec. H.264: Series H: Audiovisual and Multimedia Systems: Infrastructure of audiovisual services -- Coding of moving video: Advanced video coding for generic audiovisual services). Like MPEG LA"s other licenses, the AVC Patent Portfolio License is offered for the convenience of the marketplace as an alternative enabling users to access essential intellectual property owned by many patent holders under a single license rather than negotiating licenses with each of them individually. The AVC Patent Portfolio License includes essential patents owned by Columbia Innovation Enterprises; Electronics and Telecommunications Research Institute (ETRI); France Télécom, société anonyme; Fujitsu Limited; Koninklijke Philips Electronics N.V.; Matsushita Electric Industrial Co., Ltd.; Microsoft Corporation; Mitsubishi Electric Corporation; Robert Bosch GmbH; Samsung Electronics Co., Ltd.; Sharp Kabushiki Kaisha; Sony Corporation; Toshiba Corporation; and Victor Company of Japan, Limited. MPEG LA"s objective is to provide worldwide access to as much AVC essential intellectual property as possible for the benefit of AVC users. Therefore, any party that believes it has essential patents is welcome to submit them for evaluation of their essentiality and inclusion in the License if found essential.

  3. Drivers license display system

    NASA Astrophysics Data System (ADS)

    Prokoski, Francine J.

    1997-01-01

    Carjackings are only one of a growing class of law enforcement problems associated with increasingly violent crimes and accidents involving automobiles plays weapons, drugs and alcohol. Police traffic stops have become increasingly dangerous, with an officer having no information about a vehicle's potentially armed driver until approaching him. There are 15 million alcoholics in the US and 90 percent of them have drivers licenses. Many of them continue driving even after their licenses have ben revoked or suspended. There are thousands of unlicensed truck drivers in the country, and also thousands who routinely exceed safe operating periods without rest; often using drugs in an attempt to stay alert. MIKOS has developed the Drivers License Display Systems to reduce these and other related risks. Although every state requires the continuous display of vehicle registration information on every vehicle using public roads, no state yet requires the display of driver license information. The technology exists to provide that feature as an add-on to current vehicles for nominal cost. An initial voluntary market is expected to include: municipal, rental, and high value vehicles which are most likely to be mis-appropriated. It is anticipated that state regulations will eventually require such systems in the future, beginning with commercial vehicles, and then extending to high risk drivers and eventually all vehicles. The MIKOS system offers a dual-display approach which can be deployed now, and which will utilize all existing state licenses without requiring standardization.

  4. Benchmark for license plate character segmentation

    NASA Astrophysics Data System (ADS)

    Gonçalves, Gabriel Resende; da Silva, Sirlene Pio Gomes; Menotti, David; Shwartz, William Robson

    2016-09-01

    Automatic license plate recognition (ALPR) has been the focus of many researches in the past years. In general, ALPR is divided into the following problems: detection of on-track vehicles, license plate detection, segmentation of license plate characters, and optical character recognition (OCR). Even though commercial solutions are available for controlled acquisition conditions, e.g., the entrance of a parking lot, ALPR is still an open problem when dealing with data acquired from uncontrolled environments, such as roads and highways when relying only on imaging sensors. Due to the multiple orientations and scales of the license plates captured by the camera, a very challenging task of the ALPR is the license plate character segmentation (LPCS) step, because its effectiveness is required to be (near) optimal to achieve a high recognition rate by the OCR. To tackle the LPCS problem, this work proposes a benchmark composed of a dataset designed to focus specifically on the character segmentation step of the ALPR within an evaluation protocol. Furthermore, we propose the Jaccard-centroid coefficient, an evaluation measure more suitable than the Jaccard coefficient regarding the location of the bounding box within the ground-truth annotation. The dataset is composed of 2000 Brazilian license plates consisting of 14000 alphanumeric symbols and their corresponding bounding box annotations. We also present a straightforward approach to perform LPCS efficiently. Finally, we provide an experimental evaluation for the dataset based on five LPCS approaches and demonstrate the importance of character segmentation for achieving an accurate OCR.

  5. Near-term hybrid vehicle program, phase 1

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The preliminary design of a hybrid vehicle which fully meets or exceeds the requirements set forth in the Near Term Hybrid Vehicle Program is documented. Topics addressed include the general layout and styling, the power train specifications with discussion of each major component, vehicle weight and weight breakdown, vehicle performance, measures of energy consumption, and initial cost and ownership cost. Alternative design options considered and their relationship to the design adopted, computer simulation used, and maintenance and reliability considerations are also discussed.

  6. 10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...

  7. 10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...

  8. 10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...

  9. 10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...

  10. Landmine policy in the near-term: a framework for technology analysis and action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eimerl, D., LLNL

    1997-08-01

    Any effective solution to the problem of leftover landmines and other post-conflict unexploded ordnance (UXO) must take into account the real capabilities of demining technologies and the availability of sufficient resources to carry out demining operations. Economic and operational factors must be included in analyses of humanitarian demining. These factors will provide a framework for using currently available resources and technologies to complete this task in a time frame that is both practical and useful. Since it is likely that reliable advanced technologies for demining are still several years away, this construct applies to the intervening period. It may alsomore » provide a framework for utilizing advanced technologies as they become available. This study is an economic system model for demining operations carried out by the developed nations that clarifies the role and impact of technology on the economic performance and viability of these operations. It also provides a quantitative guide to assess the performance penalties arising from gaps in current technology, as well as the potential advantages and desirable features of new technologies that will significantly affect the international community`s ability to address this problem. Implications for current and near-term landmine and landmine technology policies are drawn.« less

  11. 76 FR 13973 - United States Warehouse Act; Processed Agricultural Products Licensing Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ... license for the processed agricultural products that are stored in climate controlled, cooler, and freezer..., and dry beans. Warehouse operators voluntarily agree to be licensed, observe the rules for licensing... program for processed agricultural products that are stored in climate controlled, cooler, and freezer...

  12. Effects of license revocation on drunk-driving offenders.

    PubMed

    Ross, H L; Gonzales, P

    1988-10-01

    Revoking or suspending the licenses of persons convicted of driving while intoxicated has often been claimed to be uniquely effective in reducing subsequent dangerous driving, as indexed by crashes and violations. This finding holds despite the impression that many suspended and revoked drivers continue to drive illegally. The research described here inquires into the operation of license actions. It uses intensive personal interviews with offenders to obtain information concerning the nature and amount of illegal driving and the effects of license deprivation on employment and other aspects of the offenders' lives.

  13. Licensing Biotech Intellectual Property in University–Industry Partnerships

    PubMed Central

    Drozdoff, Vladimir; Fairbairn, Daryl

    2015-01-01

    Appropriate negotiation and drafting of license agreements are critical to successfully establishing and managing the expansive and complex relationships that are becoming more common between industry and universities. More often than not, the resulting licensing agreements become quite lengthy and complex, and the key principles become difficult to discern among all the details. This summary provides a short, nonexhaustive introduction to some of the essential components of these licenses with the intent of providing the non–licensing professional a better appreciation of some of the key commercial and legal terms from both an academic and company perspective, keeping in mind some of the considerations that particularly apply to biotechnology deals. PMID:25605752

  14. On short-term memory of prefrontal cortex using near-infrared spectroscopy

    NASA Astrophysics Data System (ADS)

    Li, Chengjun; Gan, Zhuo; Gong, Hui; Luo, Qingming; Zeng, Shaoqun

    2003-12-01

    For studying prefrontal cortical function in short-term memory two tasks were designed. In task one, a plus expression appears on screen for 300 milliseconds every other 2 seconds and the subject is required to give it"s answer but not to remember it. In task two, an Arabic numeral presents on screen as the same frequency as in task one. While a number is present, the subject need adding it to the sum he got last time. As subjects, 26 children participated in the work. Blood volume changes(BVCs) of right prefrontal cortex(PC) under two cognitive tasks were examined using functional near infrared imaging(fNIRI), a noninvasive technique for localizing regional BVCs which correlate with neural activities. The BVCs caused by short-term memory for numbers were retrieved from BVCs by task one and task two. Results revealed that short-term memory is related to PC and the near-infrared spectroscopy(NIRS) can be used to study prefrontal cortical function in short-term memory.

  15. 23 CFR 635.110 - Licensing and qualification of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.110 Licensing and qualification... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... of a bid or before the bid may be considered for award of a contract. This, however, is not intended...

  16. 49 CFR 383.33 - Notification of driver's license suspensions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Notification of driver's license suspensions. 383... Employer Responsibilities § 383.33 Notification of driver's license suspensions. Each employee who has a... operate a commercial motor vehicle in a State or jurisdiction for any period, or who is disqualified from...

  17. 30 CFR 56.12071 - Movement or operation of equipment near high-voltage power lines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-voltage power lines. 56.12071 Section 56.12071 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... NONMETAL MINES Electricity § 56.12071 Movement or operation of equipment near high-voltage power lines. When equipment must be moved or operated near energized high-voltage powerlines (other than trolley...

  18. 78 FR 61398 - Notice of Intent To Grant Exclusive License

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 13-117] Notice of Intent To Grant Exclusive License AGENCY: National Aeronautics and Space Administration. ACTION: Notice of intent to grant exclusive... Aeronautics and Space Administration. The prospective exclusive license will comply with the terms and...

  19. Licensing biotech intellectual property in university-industry partnerships.

    PubMed

    Drozdoff, Vladimir; Fairbairn, Daryl

    2015-01-20

    Appropriate negotiation and drafting of license agreements are critical to successfully establishing and managing the expansive and complex relationships that are becoming more common between industry and universities. More often than not, the resulting licensing agreements become quite lengthy and complex, and the key principles become difficult to discern among all the details. This summary provides a short, nonexhaustive introduction to some of the essential components of these licenses with the intent of providing the non-licensing professional a better appreciation of some of the key commercial and legal terms from both an academic and company perspective, keeping in mind some of the considerations that particularly apply to biotechnology deals. Copyright © 2015 Cold Spring Harbor Laboratory Press; all rights reserved.

  20. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... required for issuance of a construction permit, operating license, combined license, in any hearing under... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases for not incorporating severe accident mitigation design alternatives into the design of the reactor to...

  1. NRC Licensing Status Summary Report for NGNP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne Leland; Kinsey, James Carl

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction andmore » operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.« less

  2. Nextgen Technologies for Mid-Term and Far-Term Air Traffic Control Operations

    NASA Technical Reports Server (NTRS)

    Prevot, Thomas

    2009-01-01

    This paper describes technologies for mid-term and far-term air traffic control operations in the Next Generation Air Transportation System (NextGen). The technologies were developed and evaluated with human-in-the-loop simulations in the Airspace Operations Laboratory (AOL) at the NASA Ames Research Center. The simulations were funded by several research focus areas within NASA's Airspace Systems program and some were co-funded by the FAA's Air Traffic Organization for Planning, Research and Technology.

  3. Workshop Report on Deep Mars: Accessing the Subsurface of Mars on Near Term Missions

    NASA Technical Reports Server (NTRS)

    Langhoff, Stephanie R. (Editor)

    2008-01-01

    The workshop encompassed three major themes. The first theme was the scientific objectives of drilling, which center on the search for clues to the existence of past life and to the geological and climate history of Mars. Key questions are where and how deep to drill? Planetary protection issues were stressed as an important consideration in the design of any drilling mission. Secondly, architectures for drilling missions were discussed, including an overview of most of the current drills in operation that would be applicable to drilling on Mars. Considerable emphasis was placed on remote operation and drilling automation technologies. Finally, alternatives to conventional drilling were discussed. These included underground moles, penetrometers, horizontal drilling, impactors, and access to the subsurface from subsurface cavities. Considerable discussion centered on the possible Mars drilling missions that could be performed in both the near and longer term. The workshop participants concluded that useful science could be obtained today using low-cost impactors, with or without a sheperding spacecraft.

  4. LONG TERM OPERATION ISSUES FOR ELECTRICAL CABLE SYSTEMS IN NUCLEAR POWER PLANTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fifield, Dr Leonard S; Duckworth, Robert C; Glass III, Dr. Samuel W.

    conditions, but extension of behavior to long term degradation under more mild conditions, such as those experienced by most installed cables in nuclear power plants, is complicated by the fact that different degradation mechanisms may be involved in extreme and mild scenarios. The discrepancy in predicted results from short term, more extreme exposure and actual results from longer term, more mild exposures can be counter intuitive. For instance, due to the attenuation of oxidation penetration in material samples rapidly aged through exposure to high temperatures, the bulk of the samples may be artificially protected from thermal aging. In another example, simultaneous exposure of cable insulation material to heat and radiation may actually lead to less damage at higher temperatures than may be observed at lower temperatures. The Light Water Reactor Sustainability program of the United States (US) Department of Energy Office (DOE) of Nuclear Energy is funding research to increase the predictive understanding of electrical cable material aging and degradation in existing nuclear power plants in support of continued safe operation of plants beyond their initial license periods. This research includes the evaluation and development of methods to assess installed cable condition.« less

  5. Association of sleep habits with accidents and near misses in United States transportation operators.

    PubMed

    Johnson, Kevin D; Patel, Sanjay R; Baur, Dorothee M; Edens, Edward; Sherry, Patrick; Malhotra, Atul; Kales, Stefanos N

    2014-05-01

    To explore sleep risk factors and their association with adverse events in transportation operators. Self-reported sleep-related behaviors were analyzed in transportation operators (drivers, pilots, and rail operators) aged 26 to 78 years who completed the National Sleep Foundation's 2012 "Planes, Trains, Automobiles, and Sleep" survey. Regression analyses were used to assess the associations of various sleep-related variables with the combined outcome of self-reported accidents and near misses. Age- and body mass-adjusted predictors of accidents/near misses included an accident while commuting (odds ratio [OR] = 4.6; confidence interval [CI], 2.1 to 9.8), driving drowsy (OR = 4.1; CI, 2.5 to 6.7), and Sheehan Disability Scale score greater than 15 (OR = 3.5; CI, 2.2 to 5.5). Sleeping more than 7 hours nightly was protective for accident/near misses (OR = 0.6; CI, 0.4 to 0.9). Recognized risk factors for poor sleep or excessive daytime sleepiness were significantly associated with self-reported near misses and/or accidents in transportation operators.

  6. Association of Sleep Habits With Accidents and Near Misses in United States Transportation Operators

    PubMed Central

    Johnson, Kevin D.; Patel, Sanjay R.; Baur, Dorothee M.; Edens, Edward; Sherry, Patrick; Malhotra, Atul; Kales, Stefanos N.

    2015-01-01

    Objective To explore sleep risk factors and their association with adverse events in transportation operators. Methods Self-reported sleep-related behaviors were analyzed in transportation operators (drivers, pilots, and rail operators) aged 26 to 78 years who completed the National Sleep Foundation’s 2012 “Planes, Trains, Automobiles, and Sleep” survey. Regression analyses were used to assess the associations of various sleep-related variables with the combined outcome of self-reported accidents and near misses. Results Age- and body mass–adjusted predictors of accidents/near misses included an accident while commuting (odds ratio [OR] = 4.6; confidence interval [CI], 2.1 to 9.8), driving drowsy (OR = 4.1; CI, 2.5 to 6.7), and Sheehan Disability Scale score greater than 15 (OR = 3.5; CI, 2.2 to 5.5). Sleeping more than 7 hours nightly was protective for accident/near misses (OR = 0.6; CI, 0.4 to 0.9). Conclusion Recognized risk factors for poor sleep or excessive daytime sleepiness were significantly associated with self-reported near misses and/or accidents in transportation operators. PMID:24806564

  7. Short-term Hydropower Reservoir Operations in Chile's Central Interconnected System: Tradeoffs between Hydrologic Alteration and Economic Performance

    NASA Astrophysics Data System (ADS)

    Olivares, M. A.

    2011-12-01

    Hydropower accounts for about 50% of the installed capacity in Chile's Central Interconnected System (CIS) and new developments are envisioned in the near future. Large projects involving reservoirs are perceived negatively by the general public. In terms of operations, hydropower scheduling takes place at monthly, weekly, daily and hourly intervals, and operations at each level affect different environmental processes. Due to its ability to quickly and inexpensively respond to short-term changes in demand, hydropower reservoirs often are operated to provide power during periods of peak demand. This operational scheme, known as hydropeaking, changes the hydrologic regime by altering the rate and frequency of changes in flow magnitude on short time scales. To mitigate impacts on downstream ecosystems, operational constraints -typically minimum instream flows and maximum ramping rates- are imposed on hydropower plants. These operational restrictions limit reduce operational flexibility and can reduce the economic value of energy generation by imposing additional costs on the operation of interconnected power systems. Methods to predict the degree of hydrologic alteration rely on statistical analyses of instream flow time series. Typically, studies on hydrologic alteration use historical operational records for comparison between pre- and post-dam conditions. Efforts to assess hydrologic alteration based on future operational schemes of reservoirs are scarce. This study couples two existing models: a mid-term operations planning and a short-term economic dispatch to simulate short-term hydropower reservoir operations under different future scenarios. Scenarios of possible future configurations of the Chilean CIS are defined with emphasis on the introduction of non-conventional renewables (particularly wind energy) and large hydropower projects in Patagonia. Both models try to reproduce the actual decision making process in the Chilean Central Interconnected System

  8. Recidivism Among Licensed-Released Prisoners Who Participated in the EM Program in Israel.

    PubMed

    Shoham, Efrat; Yehosha-Stern, Shirley; Efodi, Rotem

    2015-08-01

    Toward the end of 2006, a pilot program was launched in Israel wherein licensed-released prisoners were put under electronic monitoring (EM). In addition to EM, the pilot program, operated by the Prisoners' Rehabilitation Authority, provides programs of occupational supervision and personal therapy and is designed to allow for early release of those prisoners who, without increased supervision, would have been found unsuitable for early release. The aim of this study was to ascertain whether participation in the EM program among licensed-released prisoners in Israel might bring about lessened recidivism. For that matter, rates of arrests and incarceration were examined during a follow-up period of up to 4 years, among the entirety of licensed-released prisoners participating in the EM program between the years 2007 and 2009 (n = 155). To compare recidivism rates, a control group was assembled from among the entirety of released prisoners who were found unsuitable for early release in judicial conditions, and had therefore served the full term of their incarceration, to be released between the years 2005 and 2006 (a period of time during which an EM program was not yet operated among licensed-released prisoners in Israel). Study findings clearly show that while among the control group, 42% of released prisoners were re-incarcerated, at the end of a 4-year follow-up period, only 15% among the study group had returned to prison. These findings can be explained by combining the Social Control theory and the Self-Control theory which consider the period of time under EM program and the occupational and familial integration tools for reducing criminal connections and enhancing pro-social behavior. © The Author(s) 2014.

  9. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  10. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  11. AV Licensing Brings Kids & Media Together

    ERIC Educational Resources Information Center

    Watson, Elizabeth; Maloney, Brenda D.

    1975-01-01

    The Fitchburg, Massachusetts, Public Library holds training sessions for children on the use of audiovisual equipment, and licenses children who have learned how to operate the equipment so they may check it out and take it home. (LS)

  12. Exploring State Policy regarding Teachers Removing License Endorsements: Short Term and Long Term Policy Implications

    ERIC Educational Resources Information Center

    Earley, Penelope; Brazer, S. David

    2005-01-01

    This study explores and begins baseline documentation of state policies governing teachers' voluntary removal of endorsement areas from their licenses. Through a survey of state licensure officers we find that most states allow teachers to remove endorsements, though the specifics of how this can be done vary from state to state. The No Child Left…

  13. Saving teenage lives : the case for graduated driver licensing

    DOT National Transportation Integrated Search

    1998-11-01

    Two recent public opinion surveys point to widespread support for graduated driver licensing. A 1996 public opinion poll conducted by the American Automobile Association found that nearly three out of four respondents favor limiting the use of cars b...

  14. Antimatter Production for Near-Term Propulsion Applications

    NASA Technical Reports Server (NTRS)

    Schmidt, G. R.; Gerrish, H. P.; Martin, J. J.; Smith, G. A.; Meyer, K. J.

    1999-01-01

    The superior energy density of antimatter annihilation has often been pointed to as the ultimate source of energy for propulsion. However, the limited capacity and very low efficiency of present-day antiproton production methods suggest that antimatter may be too costly to consider for near-term propulsion applications. We address this issue by assessing the antimatter requirements for six different types of propulsion concepts, including two in which antiprotons are used to drive energy release from combined fission/fusion. These requirements are compared against the capacity of both the current antimatter production infrastructure and the improved capabilities which could exist within the early part of next century. Results show that although it may be impractical to consider systems which rely on antimatter as the sole source of propulsive energy, the requirements for propulsion based on antimatter-assisted fission/fusion do fall within projected near-ten-n production capabilities. In fact, such systems could feasibly support interstellar precursor missions and omniplanetary spaceflight with antimatter costs ranging up to $60 million per mission.

  15. Towards Harmonious Coexistence in the Unlicensed Spectrum: Rational Cooperation of Operators.

    PubMed

    Bae, Sunghwan; Kim, Hongseok

    2017-10-24

    5G New Radio (NR) operating in the unlicensed spectrum is accelerating the Fourth Industrial Revolution by supporting Internet of Things (IoT) networks or Industrial IoT deployments. Specifically, LTE-Advanced (LTE-A) is looking to achieve spectrum integration through coexistence with multi-radio access technology (RAT) systems in the same unlicensed bands with both licensed-assisted and stand-alone access. The listen-before-talk (LBT) mechanism is mainly considered to enable an LTE operator to protect other incumbent unlicensed systems. In this article, we investigate the behaviors of multiple LTE operators along with the deployment of WiFi networks in the unlicensed spectrum from both short- and long-term points of view. In countries without mandatory LBT requirements, we show that an LTE operator is susceptible to collusion with another LTE operator, thus exploiting scarce spectrum resources by deceiving other wireless networks into thinking that channels are always busy; hence, mandatory usage of LTE with LBT is highly recommended at national level to achieve harmonious coexistence in the unlicensed spectrum. We discuss several possible coexistence scenarios to resolve the operator's dilemmaas well as to improve unlicensed spectrum efficiency among multi-RAT systems, which is viable in the near future.

  16. Terms and conditions of use” for journal articles and scholarly journals : A survey on the licensing processes associated with electronic scholarly materials

    NASA Astrophysics Data System (ADS)

    Hidaka, Masako

    Copyright policies and terms directly affect the approach taken by journal editors, authors and readers regarding dealing with of articles and/or copyrighted materials. However Japanese academic society publishers have some trouble in licensing processes for copyrighted materials as previous studies pointed out. In 2011 we conducted a survey on “terms and conditions of use” of electronic journal and the licensing practices associated with electronic scholarly materials. The survey showed commercial publishers have enough announcements on reuse of copyrighted materials for readers. On the other hand Japanese academic societies' cares for readers tend to not enough. They publish journals both in Japanese and in English. Subsequently, English and Japanese templates of “terms and conditions of use” for Japanese academic society publishers were proposed. The templates were developed based on an understanding of the International Association of Scientific, Technical and Medical Publishers' “STM Permissions Guidelines,” which were designed to establish a standard and reasonable approach to granting permission for republication to all signatory publishers.The survey showed that Japanese academic society publishers and commercial publishers are facing the same issues regarding acceptable use of electronic supplemental materials for journal articles. This issue remains to be solved.

  17. 76 FR 13972 - United States Warehouse Act; Export Food Aid Commodities Licensing Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ... such as peas, beans and lentils. Current USWA licenses for agricultural products include grain, cotton, nuts, cottonseed, and dry beans. Warehouse operators that apply voluntarily agree to be licensed...

  18. 47 CFR 90.1337 - Operation near Canadian and Mexican borders.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Operation near Canadian and Mexican borders. 90.1337 Section 90.1337 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Wireless Broadband Services in the 3650-3700 MHz Band...

  19. 47 CFR 90.1337 - Operation near Canadian and Mexican borders.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Operation near Canadian and Mexican borders. 90.1337 Section 90.1337 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Wireless Broadband Services in the 3650-3700 MHz Band...

  20. 47 CFR 80.33 - Developmental license.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... number of frequencies assignable to a particular station will depend upon the specific requirements of... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE... about the licensing of developmental operations at stations subject to this part. (a) Supplemental...

  1. Principal visual word discovery for automatic license plate detection.

    PubMed

    Zhou, Wengang; Li, Houqiang; Lu, Yijuan; Tian, Qi

    2012-09-01

    License plates detection is widely considered a solved problem, with many systems already in operation. However, the existing algorithms or systems work well only under some controlled conditions. There are still many challenges for license plate detection in an open environment, such as various observation angles, background clutter, scale changes, multiple plates, uneven illumination, and so on. In this paper, we propose a novel scheme to automatically locate license plates by principal visual word (PVW), discovery and local feature matching. Observing that characters in different license plates are duplicates of each other, we bring in the idea of using the bag-of-words (BoW) model popularly applied in partial-duplicate image search. Unlike the classic BoW model, for each plate character, we automatically discover the PVW characterized with geometric context. Given a new image, the license plates are extracted by matching local features with PVW. Besides license plate detection, our approach can also be extended to the detection of logos and trademarks. Due to the invariance virtue of scale-invariant feature transform feature, our method can adaptively deal with various changes in the license plates, such as rotation, scaling, illumination, etc. Promising results of the proposed approach are demonstrated with an experimental study in license plate detection.

  2. Nearly frictionless faulting by unclamping in long-term interaction models

    USGS Publications Warehouse

    Parsons, T.

    2002-01-01

    In defiance of direct rock-friction observations, some transform faults appear to slide with little resistance. In this paper finite element models are used to show how strain energy is minimized by interacting faults that can cause long-term reduction in fault-normal stresses (unclamping). A model fault contained within a sheared elastic medium concentrates stress at its end points with increasing slip. If accommodating structures free up the ends, then the fault responds by rotating, lengthening, and unclamping. This concept is illustrated by a comparison between simple strike-slip faulting and a mid-ocean-ridge model with the same total transform length; calculations show that the more complex system unclapms the transforms and operates at lower energy. In another example, the overlapping San Andreas fault system in the San Francisco Bay region is modeled; this system is complicated by junctions and stepovers. A finite element model indicates that the normal stress along parts of the faults could be reduced to hydrostatic levels after ???60-100 k.y. of system-wide slip. If this process occurs in the earth, then parts of major transform fault zones could appear nearly frictionless.

  3. Desert RATS 2011: Near-Earth Asteroid Human Exploration Operations

    NASA Technical Reports Server (NTRS)

    Abercromby, Andrew; Gernhardt, Michael L.; Chappel, Steve

    2012-01-01

    The Desert Research and Technology Studies (D-RATS) 2011 field test involved the planning and execution of a series of exploration scenarios under operational conditions similar to those that would be expected during a human exploration mission to a near-Earth asteroid (NEA). The focus was on understanding the operations tempo during simulated NEA exploration and the implications of communications latency and limited data bandwidth. Anchoring technologies and sampling techniques were not evaluated due to the immaturity of those technologies and the inability to meaningfully test them at D-RATS. Reduced gravity analogs and simulations are being used to fully evaluate Multi-Mission Space Exploration Vehicle (MMSEV) and extravehicular (EVA) operations and interactions in near-weightlessness at a NEA as part of NASA s integrated analogs program. Hypotheses were tested by planning and performing a series of 1-day simulated exploration excursions comparing test conditions all of which involved a single Deep Space Habitat (DSH) and either zero, one, or two MMSEVs; three or four crewmembers; one of two different communications bandwidths; and a 100-second roundtrip communications latency between the field site and Houston. Excursions were executed at the Black Point Lava Flow test site with a Mission Control Center and Science Support Room at Johnson Space Center (JSC) being operated with 100-second roundtrip communication latency to the field. Crews were composed of astronauts and professional field geologists and teams of Mission Operations, Science, and Education & Public Outreach (EPO) experts also supported the mission simulations each day. Data were collected separately from the Crew, Mission Operations, Science, and EPO teams to assess the test conditions from multiple perspectives. For the operations tested, data indicates practically significant benefits may be realized by including at least one MMSEV and by including 4 versus 3 crewmembers in the NEA exploration

  4. 49 CFR 384.210 - Limitation on licensing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... permit (including a provisional or temporary license) permitting a person to drive a CMV during a period in which: (a) A person is disqualified from operating a CMV, as disqualification is defined in § 383...

  5. 49 CFR 384.210 - Limitation on licensing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... permit (including a provisional or temporary license) permitting a person to drive a CMV during a period in which: (a) A person is disqualified from operating a CMV, as disqualification is defined in § 383...

  6. 49 CFR 384.210 - Limitation on licensing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... permit (including a provisional or temporary license) permitting a person to drive a CMV during a period in which: (a) A person is disqualified from operating a CMV, as disqualification is defined in § 383...

  7. 49 CFR 384.210 - Limitation on licensing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... permit (including a provisional or temporary license) permitting a person to drive a CMV during a period in which: (a) A person is disqualified from operating a CMV, as disqualification is defined in § 383...

  8. "Near-term" Natural Catastrophe Risk Management and Risk Hedging in a Changing Climate

    NASA Astrophysics Data System (ADS)

    Michel, Gero; Tiampo, Kristy

    2014-05-01

    Competing with analytics - Can the insurance market take advantage of seasonal or "near-term" forecasting and temporal changes in risk? Natural perils (re)insurance has been based on models following climatology i.e. the long-term "historical" average. This is opposed to considering the "near-term" and forecasting hazard and risk for the seasons or years to come. Variability and short-term changes in risk are deemed abundant for almost all perils. In addition to hydrometeorological perils whose changes are vastly discussed, earthquake activity might also change over various time-scales affected by earlier local (or even global) events, regional changes in the distribution of stresses and strains and more. Only recently has insurance risk modeling of (stochastic) hurricane-years or extratropical-storm-years started considering our ability to forecast climate variability herewith taking advantage of apparent correlations between climate indicators and the activity of storm events. Once some of these "near-term measures" were in the market, rating agencies and regulators swiftly adopted these concepts demanding companies to deploy a selection of more conservative "time-dependent" models. This was despite the fact that the ultimate effect of some of these measures on insurance risk was not well understood. Apparent short-term success over the last years in near-term seasonal hurricane forecasting was brought to a halt in 2013 when these models failed to forecast the exceptional shortage of hurricanes herewith contradicting an active-year forecast. The focus of earthquake forecasting has in addition been mostly on high rather than low temporal and regional activity despite the fact that avoiding losses does not by itself create a product. This presentation sheds light on new risk management concepts for over-regional and global (re)insurance portfolios that take advantage of forecasting changes in risk. The presentation focuses on the "upside" and on new opportunities

  9. Making tradeoffs between the reasons to leave and reasons to stay employed in long-term care homes: perspectives of licensed nursing staff.

    PubMed

    McGilton, Katherine S; Boscart, Veronique M; Brown, Maryanne; Bowers, Barbara

    2014-06-01

    Turnover of licensed nursing staff in long-term care (LTC) settings (e.g., nursing homes) is a mounting concern and is associated with poor quality of care and low staff morale. Retention and turnover research in LTC have focused primarily on direct care workers (i.e., nurse aides) leaving the issues largely unexplored for licensed nursing staff (i.e., registered nurses and licensed practical nurses). The main objective of this study was to understand factors that influence nurses' intentions to remain employed at their current job. Qualitative descriptive study. Seven nursing homes in Ontario, Canada. A convenience sample of forty-one licensed LTC nurses. Data were collected through focus groups conducted at each of the participating nursing homes. Focus group discussions were transcribed verbatim. Directed content analysis was used to identify and develop themes. Work conditions were a salient element affecting nurses' intention to stay and included impact of regulations on nurse role flexibility and professional judgment, an underfunded system contributing to insufficient resources and staffing, and a lack of supportive leadership. Factors promoting nurses' willingness to stay included the development of meaningful relationships with residents and staff and opportunities for learning and professional development. Nurses also considered personal and life circumstances (e.g., marital status and seniority) when discussing intention to stay. Nurses in this study weighed positive and negative work-related factors as well as personal circumstances to determine their intent to stay. Developing a more individualized approach to address attrition of licensed nurses in LTC may be the most successful strategy for improving retention of highly skilled staff in this sector. Copyright © 2013 Elsevier Ltd. All rights reserved.

  10. Towards Harmonious Coexistence in the Unlicensed Spectrum: Rational Cooperation of Operators

    PubMed Central

    2017-01-01

    5G New Radio (NR) operating in the unlicensed spectrum is accelerating the Fourth Industrial Revolution by supporting Internet of Things (IoT) networks or Industrial IoT deployments. Specifically, LTE-Advanced (LTE-A) is looking to achieve spectrum integration through coexistence with multi-radio access technology (RAT) systems in the same unlicensed bands with both licensed-assisted and stand-alone access. The listen-before-talk (LBT) mechanism is mainly considered to enable an LTE operator to protect other incumbent unlicensed systems. In this article, we investigate the behaviors of multiple LTE operators along with the deployment of WiFi networks in the unlicensed spectrum from both short- and long-term points of view. In countries without mandatory LBT requirements, we show that an LTE operator is susceptible to collusion with another LTE operator, thus exploiting scarce spectrum resources by deceiving other wireless networks into thinking that channels are always busy; hence, mandatory usage of LTE with LBT is highly recommended at national level to achieve harmonious coexistence in the unlicensed spectrum. We discuss several possible coexistence scenarios to resolve the operator’s dilemmaas well as to improve unlicensed spectrum efficiency among multi-RAT systems, which is viable in the near future. PMID:29064434

  11. 78 FR 15383 - Approval of Direct Transfer of Licenses and Issuance of License Amendment To Effectuate Such...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-11

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 70-7003 and 70-7004; NRC-2010-0355] Approval of Direct... Operating, LLC AGENCY: Nuclear Regulatory Commission. ACTION: Notice of approval of direct transfer of control and issuance of license amendments to effectuate such transfers. SUMMARY: The U.S. Nuclear...

  12. Super-radiant effects in electron oscillators with near-cutoff operating waves

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bandurkin, I. V.; Savilov, A. V.; Lobachevsky State University of Nizhny Novgorod, Nizhny Novgorod

    2015-06-15

    Super-radiant regimes in electron oscillators can be attractive for applications requiring powerful and relatively short pulses of microwave radiation, since the peak power of the super-radiant pulse can exceed the power of the operating electron beam. In this paper, possibilities for realization of the super-radiant regimes are studied in various schemes of electron oscillators based on excitation of near-cutoff operating waves (gyrotron and orotron)

  13. 49 CFR 384.210 - Limitation on licensing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (including a provisional or temporary license) permitting a person to drive a CMV during a period in which: (a) A person is disqualified from operating a CMV, as disqualification is defined by § 383.5 of this...

  14. Uranium-Loaded Water Treatment Resins: 'Equivalent Feed' at NRC and Agreement State-Licensed Uranium Recovery Facilities - 12094

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Camper, Larry W.; Michalak, Paul; Cohen, Stephen

    Community Water Systems (CWSs) are required to remove uranium from drinking water to meet EPA standards. Similarly, mining operations are required to remove uranium from their dewatering discharges to meet permitted surface water discharge limits. Ion exchange (IX) is the primary treatment strategy used by these operations, which loads uranium onto resin beads. Presently, uranium-loaded resin from CWSs and mining operations can be disposed as a waste product or processed by NRC- or Agreement State-licensed uranium recovery facilities if that licensed facility has applied for and received permission to process 'alternate feed'. The disposal of uranium-loaded resin is costly andmore » the cost to amend a uranium recovery license to accept alternate feed can be a strong disincentive to commercial uranium recovery facilities. In response to this issue, the NRC issued a Regulatory Issue Summary (RIS) to clarify the agency's policy that uranium-loaded resin from CWSs and mining operations can be processed by NRC- or Agreement State-licensed uranium recovery facilities without the need for an alternate feed license amendment when these resins are essentially the same, chemically and physically, to resins that licensed uranium recovery facilities currently use (i.e., equivalent feed). NRC staff is clarifying its current alternate feed policy to declare IX resins as equivalent feed. This clarification is necessary to alleviate a regulatory and financial burden on facilities that filter uranium using IX resin, such as CWSs and mine dewatering operations. Disposing of those resins in a licensed facility could be 40 to 50 percent of the total operations and maintenance (O and M) cost for a CWS. Allowing uranium recovery facilities to treat these resins without requiring a license amendment lowers O and M costs and captures a valuable natural resource. (authors)« less

  15. 78 FR 23150 - Commercial Radio Operators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-18

    ...] Commercial Radio Operators AGENCY: Federal Communications Commission. ACTION: Final rule. SUMMARY: This document amends our rules concerning commercial radio operator licenses for maritime and aviation radio... certain maritime and aviation radio stations hold an appropriate commercial radio operator license. The...

  16. Practical methods for near-term piloted Mars missions

    NASA Technical Reports Server (NTRS)

    Zubrin, Robert M.; Weaver, David B.

    1993-01-01

    An evaluation is made of ways of using near-term technologies for direct and semidirect manned Mars missions. A notable feature of the present schemes is the in situ propellant production of CH4/O2 and H2O on the Martian surface in order to reduce surface consumable and return propellant requirements. Medium-energy conjunction class trajectories are shown to be optimal for such missions. Attention is given to the backup plans and abort philosophy of these missions. Either the Russian Energia B or U.S. Saturn VII launch vehicles may be used.

  17. A near-real-time full-parallax holographic display for remote operations

    NASA Technical Reports Server (NTRS)

    Iavecchia, Helene P.; Huff, Lloyd; Marzwell, Neville I.

    1991-01-01

    A near real-time, full parallax holographic display system was developed that has the potential to provide a 3-D display for remote handling operations in hazardous environments. The major components of the system consist of a stack of three spatial light modulators which serves as the object source of the hologram; a near real-time holographic recording material (such as thermoplastic and photopolymer); and an optical system for relaying SLM images to the holographic recording material and to the observer for viewing.

  18. Meta-analysis: pre-operative infliximab treatment and short-term post-operative complications in patients with ulcerative colitis.

    PubMed

    Yang, Z; Wu, Q; Wu, K; Fan, D

    2010-02-15

    Infliximab was approved for use in ulcerative colitis in recent years. It has been debated if infliximab increases the risk of post-operative complications in patients with ulcerative colitis. To perform a meta-analysis that examines the relationship between preoperative infliximab treatment and short-term post-operative complications in patients with ulcerative colitis. We searched the PubMed and MEDLINE databases to identify observational studies on the impact of pre-operative infliximab use on short-term post-operative complications in ulcerative colitis. Infectious complications mainly included wound infection, sepsis and abscess, whereas non-infectious complications included intestinal obstruction, thromboembolism and gastrointestinal haemorrhage. Pooled odds ratios (ORs) were calculated for each relationship. A total of 5 studies and 706 patients were included in our meta-analysis. Overall, we did not find a strong association between pre-operative treatment of infliximab and short-term infectious [OR 2.24, 95% confidence interval (CI) 0.63-7.95] or non-infectious (OR 0.85, 95% CI 0.50-1.45) post-operative complications in ulcerative colitis patients. On the contrary, we discovered that pre-operative infliximab use increased short-term total post-operative complications (OR 1.80, 95% CI 1.12-2.87). Pre-operative infliximab use increased the risk of short-term post-operative complications. Subgroup analysis is underpowered to assess the nature of these complications but shows a trend towards increased post-operative infection.

  19. Model to predict hyperbilirubinemia in healthy term and near-term newborns with exclusive breast feeding.

    PubMed

    Huang, Hsin-Chung; Yang, Hwai-I; Chang, Yu-Hsun; Chang, Rui-Jane; Chen, Mei-Huei; Chen, Chien-Yi; Chou, Hung-Chieh; Hsieh, Wu-Shiun; Tsao, Po-Nien

    2012-12-01

    The aim of this study was to identify high-risk newborns who will subsequently develop significant hyperbilirubinemia Days 4 to 10 of life by using the clinical data from the first three days of life. We retrospectively collected exclusively breastfeeding healthy term and near-term newborns born in our nursery between May 1, 2002, to June 30, 2005. Clinical data, including serum bilirubin were collected and the significant predictors were identified. Bilirubin level ≥15mg/dL during Days 4 to 10 of life was defined as significant hyperbilirubinemia. A prediction model to predict subsequent hyperbilirubinemia was established. This model was externally validated in another group of newborns who were enrolled by the same criteria to test its discrimination capability. Totally, 1979 neonates were collected and 1208 cases were excluded by our exclusion criteria. Finally, 771 newborns were enrolled and 182 (23.6%) cases developed significant hyperbilirubinemia during Days 4 to 10 of life. In the logistic regression analysis, gestational age, maximal body weight loss percentage, and peak bilirubin level during the first 72 hours of life were significantly associated with subsequent hyperbilirubinemia. A prediction model was derived with the area under receiver operating characteristic (AUROC) curve of 0.788. Model validation in the separate study (N = 209) showed similar discrimination capability (AUROC = 0.8340). Gestational age, maximal body weight loss percentage, and peak serum bilirubin level during the first 3 days of life have highest predictive value of subsequent significant hyperbilirubinemia. We provide a good model to predict the risk of subsequent significant hyperbilirubinemia. Copyright © 2012. Published by Elsevier B.V.

  20. Antimatter Requirements and Energy Costs for Near-Term Propulsion Applications

    NASA Technical Reports Server (NTRS)

    Schmidt, G. R.; Gerrish, H. P.; Martin, J. J.; Smith, G. A.; Meyer, K. J.

    1999-01-01

    The superior energy density of antimatter annihilation has often been pointed to as the ultimate source of energy for propulsion. However, the limited capacity and very low efficiency of present-day antiproton production methods suggest that antimatter may be too costly to consider for near-term propulsion applications. We address this issue by assessing the antimatter requirements for six different types of propulsion concepts, including two in which antiprotons are used to drive energy release from combined fission/fusion. These requirements are compared against the capacity of both the current antimatter production infrastructure and the improved capabilities that could exist within the early part of next century. Results show that although it may be impractical to consider systems that rely on antimatter as the sole source of propulsive energy, the requirements for propulsion based on antimatter-assisted fission/fusion do fall within projected near-term production capabilities. In fact, a new facility designed solely for antiproton production but based on existing technology could feasibly support interstellar precursor missions and omniplanetary spaceflight with antimatter costs ranging up to $6.4 million per mission.

  1. 10 CFR 34.61 - Records of the specific license for industrial radiography.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Records of the specific license for industrial radiography. 34.61 Section 34.61 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.61...

  2. 10 CFR 34.61 - Records of the specific license for industrial radiography.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Records of the specific license for industrial radiography. 34.61 Section 34.61 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.61...

  3. 10 CFR 34.61 - Records of the specific license for industrial radiography.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Records of the specific license for industrial radiography. 34.61 Section 34.61 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.61...

  4. 10 CFR 34.61 - Records of the specific license for industrial radiography.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Records of the specific license for industrial radiography. 34.61 Section 34.61 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.61...

  5. 10 CFR 34.61 - Records of the specific license for industrial radiography.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Records of the specific license for industrial radiography. 34.61 Section 34.61 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.61...

  6. Compliance with driver's license laws and illegal licensing among commercial bus drivers in Lagos, Nigeria: policy implications and evidence for action.

    PubMed

    Okafor, I P; Odeyemi, K A; Dolapo, D C; Adegbola, A A

    2014-09-01

    To determine the level of compliance with driver's license laws among commercial bus drivers in Lagos, Nigeria. Two intercity motor parks were selected by simple random sampling and all consenting minibus drivers participated in the study. Key Informant Interviews (KIIs) were also conducted with selected officials in the driver training and licensing authorities. Compliance with the minimum age for driving was high (93.6%), so also was having driving test prior to driver's license procurement (83.3%). Formal driver training and VA testing were very low, (26.1% and 32.9% respectively) Overall, only 9.3% of them were found to have fulfilled all the pre-license obligations before obtaining their first driver's license. The odds of a driver with a secondary education having formal driver training is 3.33 times higher than those with no education (OR 3.33, 95% CI 1.01-11.35). Drivers who were 60 years or older were 3.62 times more likely to be compliant than those who were between 20-29 years (OR 3.62, 95% CI 0.56-29.19). For the 98.3% of them who possessed valid licenses, 52.3% of them obtained them illegally. All the key officials saw RTIs as a serious public health problem but faced several challenges in the course of their work. Overall compliance with pre-license regulations was very poor. There is need for a review and strict enforcement of driver's license laws to improve compliance. Also vital are fostering inter-sectoral collaboration and improvement in the operations of all establishments involved in driver training and license procurement in Nigeria.

  7. Almost conserved operators in nearly many-body localized systems

    NASA Astrophysics Data System (ADS)

    Pancotti, Nicola; Knap, Michael; Huse, David A.; Cirac, J. Ignacio; Bañuls, Mari Carmen

    2018-03-01

    We construct almost conserved local operators, that possess a minimal commutator with the Hamiltonian of the system, near the many-body localization transition of a one-dimensional disordered spin chain. We collect statistics of these slow operators for different support sizes and disorder strengths, both using exact diagonalization and tensor networks. Our results show that the scaling of the average of the smallest commutators with the support size is sensitive to Griffiths effects in the thermal phase and the onset of many-body localization. Furthermore, we demonstrate that the probability distributions of the commutators can be analyzed using extreme value theory and that their tails reveal the difference between diffusive and subdiffusive dynamics in the thermal phase.

  8. 7 CFR 1530.103 - License eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OF AGRICULTURE THE REFINED SUGAR RE-EXPORT PROGRAM, THE SUGAR CONTAINING PRODUCTS RE-EXPORT PROGRAM, AND THE POLYHYDRIC ALCOHOL PROGRAM § 1530.103 License eligibility. (a) A raw cane sugar refiner, a manufacturer of sugar containing products, or a producer of certain polyhydric alcohols, that owns and operates...

  9. 7 CFR 1530.103 - License eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OF AGRICULTURE THE REFINED SUGAR RE-EXPORT PROGRAM, THE SUGAR CONTAINING PRODUCTS RE-EXPORT PROGRAM, AND THE POLYHYDRIC ALCOHOL PROGRAM § 1530.103 License eligibility. (a) A raw cane sugar refiner, a manufacturer of sugar containing products, or a producer of certain polyhydric alcohols, that owns and operates...

  10. Safely Enabling Low-Altitude Airspace Operations

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal

    2015-01-01

    Near-term Goal: Enable initial low-altitude airspace and UAS operations with demonstrated safety as early as possible, within 5 years. Long-term Goal: Accommodate increased UAS operations with highest safety, efficiency, and capacity as much autonomously as possible (10-15 years).

  11. 15 CFR 970.515 - Duration of a license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance/Transfer/Terms... Administrator, based on the criteria, and for the length of time, specified in paragraph (b) of this section. ...

  12. 10 CFR 52.110 - Termination of license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... final legally effective order to permanently cease operations has come into effect, the 10 CFR part 52... reasons for concluding that the environmental impacts associated with site-specific decommissioning...

  13. 78 FR 46379 - Exelon Generation Company, LLC, License Renewal Application for Braidwood Station, Units 1 and 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ...On May 29, 2013, Exelon Generation Company, LLC (Exelon) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for renewal of Facility Operating Licenses (NPF-72 and NPF-77) for an additional 20 years of operation for Braidwood Station, Units 1 and 2. Braidwood Station is located in Will County, Illinois. The current operating licenses for Braidwood Station, Units 1 and 2, expire on October 17, 2026 and December 18, 2027, respectively. This notice advises the public that the NRC intends to gather information to prepare an EIS on the proposed license renewal.

  14. 47 CFR 90.1337 - Operation near Canadian and Mexican borders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Wireless Broadband Services in the 3650-3700 MHz Band § 90.1337 Operation near Canadian and Mexican borders. (a) Fixed devices generally must be located at least 8 kilometers from the U.S./Canada or U.S./Mexico border if the antenna of that device looks within...

  15. 47 CFR 13.9 - Eligibility and application for new license or endorsement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Eligibility and application for new license or endorsement. 13.9 Section 13.9 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.9 Eligibility and application for new license or endorsement. (a) If found qualified...

  16. 9 CFR 2.5 - Duration of license and termination of license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Duration of license and termination of license. 2.5 Section 2.5 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Licensing § 2.5 Duration of license and termination of...

  17. 9 CFR 2.5 - Duration of license and termination of license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Duration of license and termination of license. 2.5 Section 2.5 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Licensing § 2.5 Duration of license and termination of...

  18. 9 CFR 2.5 - Duration of license and termination of license.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Duration of license and termination of license. 2.5 Section 2.5 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Licensing § 2.5 Duration of license and termination of...

  19. 9 CFR 2.5 - Duration of license and termination of license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Duration of license and termination of license. 2.5 Section 2.5 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Licensing § 2.5 Duration of license and termination of...

  20. 9 CFR 2.5 - Duration of license and termination of license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Duration of license and termination of license. 2.5 Section 2.5 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Licensing § 2.5 Duration of license and termination of...

  1. Improving understanding of near-term barrier island evolution through multi-decadal assessment of morphologic change

    USGS Publications Warehouse

    Lentz, Erika E.; Hapke, Cheryl J.; Stockdon, Hilary F.; Hehre, Rachel E.

    2013-01-01

    Observed morphodynamic changes over multiple decades were coupled with storm-driven run-up characteristics at Fire Island, New York, to explore the influence of wave processes relative to the impacts of other coastal change drivers on the near-term evolution of the barrier island. Historical topography was generated from digital stereo-photogrammetry and compared with more recent lidar surveys to quantify near-term (decadal) morphodynamic changes to the beach and primary dune system between the years 1969, 1999, and 2009. Notably increased profile volumes were observed along the entirety of the island in 1999, and likely provide the eolian source for the steady dune crest progradation observed over the relatively quiescent decade that followed. Persistent patterns of erosion and accretion over 10-, 30-, and 40-year intervals are attributable to variations in island morphology, human activity, and variations in offshore bathymetry and island orientation that influence the wave energy reaching the coast. Areas of documented long-term historical inlet formation and extensive bayside marsh development show substantial landward translation of the dune–beach profile over the near-term period of this study. Correlations among areas predicted to overwash, observed elevation changes of the dune crestline, and observed instances of overwash in undeveloped segments of the barrier island verify that overwash locations can be accurately predicted in undeveloped segments of coast. In fact, an assessment of 2012 aerial imagery collected after Hurricane Sandy confirms that overwash occurred at the majority of near-term locations persistently predicted to overwash. In addition to the storm wave climate, factors related to variations within the geologic framework which in turn influence island orientation, offshore slope, and sediment supply impact island behavior on near-term timescales.

  2. 47 CFR 13.201 - Qualifying for a commercial operator license or endorsement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... must pass an examination for the issuance of a new Ship Radar Endorsement. Each application for the... License: Written Elements 1, 3, and 9. (7) Ship Radar Endorsement: Written Element 8. [58 FR 9124, Feb. 19...

  3. 47 CFR 13.201 - Qualifying for a commercial operator license or endorsement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... must pass an examination for the issuance of a new Ship Radar Endorsement. Each application for the... License: Written Elements 1, 3, and 9. (7) Ship Radar Endorsement: Written Element 8. [58 FR 9124, Feb. 19...

  4. Field validation of secondary data sources for enumerating retail tobacco outlets in a state without tobacco outlet licensing.

    PubMed

    D'Angelo, Heather; Fleischhacker, Sheila; Rose, Shyanika W; Ribisl, Kurt M

    2014-07-01

    Identifying tobacco retail outlets for U.S. FDA compliance checks or calculating tobacco outlet density is difficult in the 13 States without tobacco retail licensing or where licensing lists are unavailable for research. This study uses primary data collection to identify tobacco outlets in three counties in a non-licensing state and validate two commercial secondary data sources. We calculated sensitivity and positive predictive values (PPV) to examine the evidence of validity for two secondary data sources, and conducted a geospatial analysis to determine correct allocation to census tract. ReferenceUSA had almost perfect sensitivity (0.82) while Dun & Bradstreet (D&B) had substantial sensitivity (0.69) for identifying tobacco outlets; combined, sensitivity improved to 0.89. D&B identified fewer "false positives" with a PPV of 0.82 compared to 0.71 for ReferenceUSA. More than 90% of the outlets identified by ReferenceUSA were geocoded to the correct census tract. Combining two commercial data sources resulted in enumeration of nearly 90% of tobacco outlets in a three county area. Commercial databases appear to provide a reasonably accurate way to identify tobacco outlets for enforcement operations and density estimation. Copyright © 2014 Elsevier Ltd. All rights reserved.

  5. Managing aging effects on dry cask storage systems for extended long-term storage and transportation of used fuel - rev. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chopra, O.K.; Diercks, D.; Fabian, R.

    The cancellation of the Yucca Mountain repository program in the United States raises the prospect of extended long-term storage (i.e., >120 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S. Nuclear Regulatory Commission (NRC) at the expiration of the license term upon application by the licensee for a periodmore » not to exceed 40 years. Application for ISFSI license renewals must include the following: (1) Time-limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation; and (2) a description of the aging management program (AMP) for management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must also include design bases information as documented in the most recent updated final safety analysis report as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference provided that those references are clear and specific. The NRC has recently issued the Standard Review Plan (SRP) for renewal of used-fuel dry cask storage system (DCSS) licenses and Certificates of Compliance (CoCs), NUREG-1927, under which NRC may renew a specific license or a CoC for a term not to exceed 40 years. Both the license and the CoC renewal applications must contain revised technical requirements and operating conditions (fuel storage, surveillance and maintenance, and other requirements) for the ISFSI and DCSS that address aging effects

  6. Near-term acceleration in the rate of temperature change

    NASA Astrophysics Data System (ADS)

    Smith, Steven J.; Edmonds, James; Hartin, Corinne A.; Mundra, Anupriya; Calvin, Katherine

    2015-04-01

    Anthropogenically driven climate changes, which are expected to impact human and natural systems, are often expressed in terms of global-mean temperature. The rate of climate change over multi-decadal scales is also important, with faster rates of change resulting in less time for human and natural systems to adapt. We find that present trends in greenhouse-gas and aerosol emissions are now moving the Earth system into a regime in terms of multi-decadal rates of change that are unprecedented for at least the past 1,000 years. The rate of global-mean temperature increase in the CMIP5 (ref. ) archive over 40-year periods increases to 0.25 +/- 0.05 °C (1σ) per decade by 2020, an average greater than peak rates of change during the previous one to two millennia. Regional rates of change in Europe, North America and the Arctic are higher than the global average. Research on the impacts of such near-term rates of change is urgently needed.

  7. Preliminary Planning for NEAR's Low-Altitude Operations at 433 Eros

    NASA Technical Reports Server (NTRS)

    Antreasian, P. G.; Helfrich, C. L.; Miller, J. K.; Owen, W. M.; Williams, B. G.; Yeomans, D. K.; Scheeres, D. J.; Dunham, D. W.; Farquhar, R. W.; McAdams, J. V.

    1999-01-01

    On February 14, 2000, an orbit insertion burn will place NASA's Near Earth Asteroid Rendezvous (NEAR) spacecraft (S/C) into orbit around asteroid 433 Eros. NEAR will initially orbit Eros with distances ranging from 500 to 100 km in order to characterize the shape, gravity and spin of Eros. Once the physical parameters of Eros are determined reasonably well, the plan is to establish an orbit of the NEAR S/C with increasingly lower altitudes as the one year orbital mission progresses while further characterizing the gravity and shape of Eros. Towards the end of the NEAR mission, after the shape, gravity and spin of Eros have been well characterized, the scientific interest of obtaining very close observations (< 5 km) can be realized. The navigation during this phase relies on a combination of NASA's Deep Space Network (DSN) radio metric tracking, laser ranging (LIDAR) data from the S/C to the surface of Eros, and onboard optical imaging of landmarks on Eros. This paper will provide preliminary plans for mission design and navigation during the last two months of the orbit phase, where several close passes to the surface will be incorporated to enhance the science return. The culmination of these close passes will result in the eventual landing of the S/C on the surface of Eros. Several considerations for these plans are given by Antreasian, et at. [1998]. The objective for the end of the mission will be to land the S/C autonomously using the surface relative information obtained from the onboard LIDAR instrument. The goal will be to soft land the S/C in such a way as to keep it operational. With the use of an onboard LIDAR landing algorithm as discussed by Antreasian et at. [1998], it is believed that the S/C impact velocity can be kept well under 7 m/s which is a requirement for allowing the S/C to remain operational.

  8. Cold Test Operation of the German VEK Vitrification Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fleisch, J.; Schwaab, E.; Weishaupt, M.

    2008-07-01

    In 2007 the German High-Level Liquid Waste (HLLW) Vitrification plant VEK (Verglasungseinrichtung Karlsruhe) has passed a three months integral cold test operation as final step before entering the hot phase. The overall performance of the vitrification process equipment with a liquid-fed ceramic glass melter as main component proved to be completely in line with the requirements of the regulatory body. The retention efficiency of main radioactive-bearing elements across melter and wet off-gas treatment system exceeded the design values distinctly. The strategy to produce a specified waste glass could be successfully demonstrated. The results of the cold test operation allow enteringmore » the next step of hot commissioning, i.e. processing of approximately 2 m{sup 3} of diluted HLLW. In summary: An important step of the VEK vitrification plant towards hot operation has been the performance of the cold test operation from April to July 2007. This first integral operation was carried out under boundary conditions and rules established for radioactive operation. Operation and process control were carried out following the procedure as documented in the licensed operational manuals. The function of the process technology and the safe operation could be demonstrated. No severe problems were encountered. Based on the positive results of the cold test, application of the license for hot operation has been initiated and is expected in the near future. (authors)« less

  9. Natural analog studies: Licensing perspective

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradbury, J.W.

    1995-09-01

    This report describes the licensing perspective of the term {open_quotes}natural analog studies{close_quotes} as used in CFR Part 60. It describes the misunderstandings related to its definition which has become evident during discussions at the U.S Nuclear Regulatory Commission meetings and tries to clarify the appropriate applications of natural analog studies to aspects of repository site characterization.

  10. Proving Ground Potential Mission and Flight Test Objectives and Near Term Architectures

    NASA Technical Reports Server (NTRS)

    Smith, R. Marshall; Craig, Douglas A.; Lopez, Pedro Jr.

    2016-01-01

    NASA is developing a Pioneering Space Strategy to expand human and robotic presence further into the solar system, not just to explore and visit, but to stay. NASA's strategy is designed to meet technical and non-technical challenges, leverage current and near-term activities, and lead to a future where humans can work, learn, operate, and thrive safely in space for an extended, and eventually indefinite, period of time. An important aspect of this strategy is the implementation of proving ground activities needed to ensure confidence in both Mars systems and deep space operations prior to embarking on the journey to the Mars. As part of the proving ground development, NASA is assessing potential mission concepts that could validate the required capabilities needed to expand human presence into the solar system. The first step identified in the proving ground is to establish human presence in the cis-lunar vicinity to enable development and testing of systems and operations required to land humans on Mars and to reach other deep space destinations. These capabilities may also be leveraged to support potential commercial and international objectives for Lunar Surface missions. This paper will discuss a series of potential proving ground mission and flight test objectives that support NASA's journey to Mars and can be leveraged for commercial and international goals. The paper will discuss how early missions will begin to satisfy these objectives, including extensibility and applicability to Mars. The initial capability provided by the launch vehicle will be described as well as planned upgrades required to support longer and more complex missions. Potential architectures and mission concepts will be examined as options to satisfy proving ground objectives. In addition, these architectures will be assessed on commercial and international participation opportunities and on how well they develop capabilities and operations applicable to Mars vicinity missions.

  11. 78 FR 75381 - Entergy Operations, Inc.; Combined License Application for Grand Gulf Unit 3; Exemption From the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-11

    ... License Application To Comply With Enhancements to Emergency Preparedness Rule AGENCY: Nuclear Regulatory... exemption from addressing enhancements to the Emergency Preparedness (EP) rules in their Combined License..., 2013, [[Page 75382

  12. Evaluation of the Terminal Precision Scheduling and Spacing System for Near-Term NAS Application

    NASA Technical Reports Server (NTRS)

    Thipphavong, Jane; Martin, Lynne Hazel; Swenson, Harry N.; Lin, Paul; Nguyen, Jimmy

    2012-01-01

    NASA has developed a capability for terminal area precision scheduling and spacing (TAPSS) to provide higher capacity and more efficiently manage arrivals during peak demand periods. This advanced technology is NASA's vision for the NextGen terminal metering capability. A set of human-in-the-loop experiments was conducted to evaluate the performance of the TAPSS system for near-term implementation. The experiments evaluated the TAPSS system under the current terminal routing infrastructure to validate operational feasibility. A second goal of the study was to measure the benefit of the Center and TRACON advisory tools to help prioritize the requirements for controller radar display enhancements. Simulation results indicate that using the TAPSS system provides benefits under current operations, supporting a 10% increase in airport throughput. Enhancements to Center decision support tools had limited impact on improving the efficiency of terminal operations, but did provide more fuel-efficient advisories to achieve scheduling conformance within 20 seconds. The TRACON controller decision support tools were found to provide the most benefit, by improving the precision in schedule conformance to within 20 seconds, reducing the number of arrivals having lateral path deviations by 50% and lowering subjective controller workload. Overall, the TAPSS system was found to successfully develop an achievable terminal arrival metering plan that was sustainable under heavy traffic demand levels and reduce the complexity of terminal operations when coupled with the use of the terminal controller advisory tools.

  13. Interpreting operational altimetry signals in near-coastal areas using underwater autonomous vehicles and remotely sensed ocean colour data

    NASA Astrophysics Data System (ADS)

    Borrione, Ines; Oddo, Paolo; Russo, Aniello; Coelho, Emanuel

    2017-04-01

    During the LOGMEC16 (Long-Term Glider Mission for Environmental Characterization) sea trial carried out in the eastern Ligurian Sea (Northwestern Mediterranean Sea), two oceanographic gliders rated to a maximum depth of 1000m were operating continuously from 3 May to 27 June 2016. When possible, glider tracks were synchronized with the footprints of contemporaneous altimeters (i.e., Jason 2, Altika and Cryosat 2). Temperature and salinity measured by the gliders along the tracks that were co-localized with the altimeter passages, were used to calculate along-track dynamic heights. The latter were then compared with near-real time absolute sea level CMEMS-TAPAS (Copernicus Marine Environment Monitoring Service - Tailored Product for Data Assimilation) product. TAPAS provides along-track sea level anomaly (SLA) estimates together with all the terms used in the correction and the associated Mean Dynamic Topography. Where available, the CMEMS near-real time 1km resolution, Aqua-MODIS ocean colour data was also used as a tracer of the main oceanographic features of the region. Comparison between SLA derived from gliders and TAPAS along common transects, indicates that differences increase for larger sampling time lags between platforms and especially when time differences exceed 20 hrs. In fact, contemporaneous ocean color images reveal the presence of several mesoscale/sub-mesoscale structures (i.e., transient meanders and filaments), suggesting that the oceanographic variability of the region is likely the main cause for the differences observed between the glider and altimetry-based SLA. Results from this study provide additional evidence of the advantages on using a networked ocean observing system. In fact, the interpretation of in-situ observations obtained from a continuously operating sampling platform (also during ongoing experiments at sea) can be greatly improved when combined with other operational datasets, as the CMEMS SLA used here.

  14. Implementation of a near-zero fluoroscopy approach in interventional electrophysiology: impact of operator experience.

    PubMed

    Wannagat, Severin; Loehr, Lena; Lask, Sebastian; Völk, Katharina; Karaköse, Tamer; Özcelik, Cemil; Mügge, Andreas; Wutzler, Alexander

    2018-04-01

    Catheter ablation is performed under fluoroscopic guidance. Reduction of radiation dose for patients and staff is emphasized by current recommendations. Previous studies have shown that lower operator experience leads to increased radiation dose. On the other hand, less experienced operators may depend even more on fluoroscopic guidance. Our study aimed to evaluate feasibility and efficacy of a non-fluoroscopic approach in different training levels. From January 2017, a near-zero fluoroscopy approach was established in two centers. Four operators (beginner, 1st year fellow, 2nd year fellow, expert) were instructed to perform the complete procedure with the use of a 3-D mapping system without fluoroscopy. A historical cohort that underwent procedures with fluoroscopy use served as control group. Dose area product (DPA), procedure duration, acute procedural success, and complications were compared between the groups and for each operator. Procedures were performed in 157 patients. The first 100 patients underwent procedures with fluoroscopic guidance, the following 57 procedures were performed with the near-zero fluoroscopy approach. The results show a significant reduction in DPA for all operators immediately after implementation of the near-zero fluoroscopy protocol (control 637 ± 611 μGy/m 2 ; beginner 44.1 ± 79.5 μGy/m 2 , p = 0.002; 1st year fellow 24.3 ± 46.4.5 μGy/m 2 , p = 0.001; 2nd year fellow 130.3 ± 233.3 μGy/m 2 , p = 0.003; expert 9.3 ± 37.4 μGy/m 2 , P < 0.001). Procedure duration, acute success, and complications were not significantly different between the groups. Our results show a 90% reduction of DPA shortly after implementation of a near-zero fluoroscopy approach in interventional electrophysiology even in operators in training.

  15. 47 CFR 25.134 - Licensing provisions for Very Small Aperture Terminal (VSAT) and C-band Small Aperture Terminal...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Applications and Licenses Earth Stations § 25.134 Licensing provisions for Very Small Aperture Terminal (VSAT... affected adjacent satellite operators by the operation of the non-conforming earth station. (b) VSAT...) VSAT networks operating in the 12/14 GHz bands may use more than one hub earth station, and the hubs...

  16. ISRU Development Strategy and Recent Activities to Support Near and Far Term Missions

    NASA Astrophysics Data System (ADS)

    Baird, Russell S.; Sanders, Gerald B.; Simon, Thomas M.

    2003-01-01

    The practical expansion of humans beyond low Earth orbit into near-Earth space and out into the solar system for exploration, commercialization, tourism, and colonization will require the effective utilization of whatever indigenous resources are available to make these endeavors economically feasible and capable of extended operations. This concept of ``living off the land'' is called In-Situ Resource Utilization (ISRU). The resources available for ISRU applications vary widely, depending upon the location. However, there are resources, technologies, and processes that are common to multiple destinations and ISRU-related applications. These resources range from carbon dioxide (CO2) and water vapor found in human habitats (surface & spacecraft) and in the Martian atmosphere, to water (ice and hydrated minerals) and various oxygen, carbon, and metal-bearing resources found on comets and asteroids, and in planetary surface materials at numerous destinations of interest (Moon, Mars, Titan, and Europa). Many parties are investigating the common technologies and processes to effectively extract and use these resources. This paper will discuss how ISRU is enabling for both near and far term human exploration missions, and present a summary of recent and on-going ISRU work sponsored by the NASA/Johnson Space Center. Technology development activities that will be described in detail include an advanced CO2 freezer acquisition system, a multi-fluid common bulkhead cryogenic storage tank, and a variety of microchannel chemical reactor concepts. Recent advanced Sabatier reactor concept development activities in preparation for later, end-to-end system testing will be described as well. This paper will also discuss an ISRU-based strategy to enable extensive robotic and human surface exploration operations and a related on-going demonstration program for a fuel cell based power plant for rover applications. Technology commonalities between ISRU, life support systems, and Extra

  17. Image simulation for automatic license plate recognition

    NASA Astrophysics Data System (ADS)

    Bala, Raja; Zhao, Yonghui; Burry, Aaron; Kozitsky, Vladimir; Fillion, Claude; Saunders, Craig; Rodríguez-Serrano, José

    2012-01-01

    Automatic license plate recognition (ALPR) is an important capability for traffic surveillance applications, including toll monitoring and detection of different types of traffic violations. ALPR is a multi-stage process comprising plate localization, character segmentation, optical character recognition (OCR), and identification of originating jurisdiction (i.e. state or province). Training of an ALPR system for a new jurisdiction typically involves gathering vast amounts of license plate images and associated ground truth data, followed by iterative tuning and optimization of the ALPR algorithms. The substantial time and effort required to train and optimize the ALPR system can result in excessive operational cost and overhead. In this paper we propose a framework to create an artificial set of license plate images for accelerated training and optimization of ALPR algorithms. The framework comprises two steps: the synthesis of license plate images according to the design and layout for a jurisdiction of interest; and the modeling of imaging transformations and distortions typically encountered in the image capture process. Distortion parameters are estimated by measurements of real plate images. The simulation methodology is successfully demonstrated for training of OCR.

  18. Structuring the Multimedia Deal: Legal Issues--Part 1: Licensing in the Multimedia Arena.

    ERIC Educational Resources Information Center

    Gersh, David L.; Jeffrey, Sheri

    1993-01-01

    Provides an overview of legal issues related to licensing entertainment rights for multimedia source materials, including the grant of rights clause, copyright ownership, territory and languages, term provision, specifications, approvals/controls, royalties, guilds, bankruptcies, termination of the license, and confidentiality. Common mistakes…

  19. 77 FR 26304 - Prospective Grant of Exclusive License: Development of Ocular Therapeutics Utilizing the Peptide...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... Biotech, a Texas corporation, having a place of business in Dallas, Texas, to practice the inventions... E-008-2004/0. The exclusive license is one which qualifies under the Start-Up License Agreement... start up exclusive license will be royalty bearing and will comply with the terms and conditions of 35 U...

  20. Near-Term Options for Improving Security at Los Angeles International Airport

    DTIC Science & Technology

    2004-09-26

    the Transportation Security Administration (TSA), the Los Angeles Police Department ( LAPD ), and LAX to make sure the list was reasonable...World Airports; the Transportation Security Agency; the Los Angeles International Airport Police Department ; the Los Angeles Police Department ; the Los ...Airports. iii PREFACE This document assesses near-term security

  1. 47 CFR 78.13 - Eligibility for license.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Eligibility for license. 78.13 Section 78.13 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY... television system, (b) To a cooperative enterprise wholly owned by cable television owners or operators, or...

  2. 47 CFR 78.13 - Eligibility for license.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Eligibility for license. 78.13 Section 78.13 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY... television system, (b) To a cooperative enterprise wholly owned by cable television owners or operators, or...

  3. 47 CFR 78.13 - Eligibility for license.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Eligibility for license. 78.13 Section 78.13 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY... television system, (b) To a cooperative enterprise wholly owned by cable television owners or operators, or...

  4. 47 CFR 78.13 - Eligibility for license.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Eligibility for license. 78.13 Section 78.13 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY... television system, (b) To a cooperative enterprise wholly owned by cable television owners or operators, or...

  5. 47 CFR 78.13 - Eligibility for license.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Eligibility for license. 78.13 Section 78.13 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY... television system, (b) To a cooperative enterprise wholly owned by cable television owners or operators, or...

  6. 76 FR 38463 - SAFE Mortgage Licensing Act: Minimum Licensing Standards and Oversight Responsibilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ... Parts 30 and 3400 SAFE Mortgage Licensing Act: Minimum Licensing Standards and Oversight... No. FR-5271-F-03] RIN 2502-A170 SAFE Mortgage Licensing Act: Minimum Licensing Standards and... pursuant to the Secure and Fair Enforcement Mortgage Licensing Act of 2008 (SAFE Act or Act), to ensure...

  7. Computer Software: Copyright and Licensing Considerations for Schools and Libraries. ERIC Digest.

    ERIC Educational Resources Information Center

    Reed, Mary Hutchings

    This digest notes that the terms and conditions of computer software package license agreements control the use of software in schools and libraries, and examines the implications of computer software license agreements for classroom use and for library lending policies. Guidelines are provided for interpreting the Copyright Act, and insuring the…

  8. 75 FR 66709 - Commercial Radio Operators Rules

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    .... SUMMARY: This document proposes to amend our rules concerning commercial radio operator licenses for... operators service, to determine which rules can be clarified, streamlined, or eliminated. DATES: Submit... Radiotelegraph Operator's Certificates, and seek comment on extending the current five-year license for...

  9. 10 CFR 171.15 - Annual fees: Reactor licenses and independent spent fuel storage licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Annual fees: Reactor licenses and independent spent fuel... REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS LICENSES, INCLUDING HOLDERS OF CERTIFICATES OF... NRC § 171.15 Annual fees: Reactor licenses and independent spent fuel storage licenses. (a) Each...

  10. 10 CFR 171.15 - Annual fees: Reactor licenses and independent spent fuel storage licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Annual fees: Reactor licenses and independent spent fuel... REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS LICENSES, INCLUDING HOLDERS OF CERTIFICATES OF... NRC § 171.15 Annual fees: Reactor licenses and independent spent fuel storage licenses. (a) Each...

  11. 47 CFR 0.484 - Amateur radio operator examinations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Amateur radio operator examinations. 0.484....484 Amateur radio operator examinations. Generally, examinations for amateur radio operation licenses... FCC conducts examinations for amateur radio operator licenses, they shall take place at locations and...

  12. Aerosol contribution to the rapid warming of near-term climate under RCP 2.6

    NASA Astrophysics Data System (ADS)

    Chalmers, N.; Highwood, E. J.; Hawkins, E.; Sutton, R.; Wilcox, L. J.

    2012-09-01

    The importance of aerosol emissions for near term climate projections is investigated by analysing simulations with the HadGEM2-ES model under two different emissions scenarios: RCP2.6 and RCP4.5. It is shown that the near term warming projected under RCP2.6 is greater than under RCP4.5, even though the greenhouse gas forcing is lower. Rapid and substantial reductions in sulphate aerosol emissions due to a reduction of coal burning in RCP2.6 lead to a reduction in the negative shortwave forcing due to aerosol direct and indirect effects. Indirect effects play an important role over the northern hemisphere oceans, especially the subtropical northeastern Pacific where an anomaly of 5-10 Wm-2 develops. The pattern of surface temperature change is consistent with the expected response to this surface radiation anomaly, whilst also exhibiting features that reflect redistribution of energy, and feedbacks, within the climate system. These results demonstrate the importance of aerosol emissions as a key source of uncertainty in near term projections of global and regional climate.

  13. 10 CFR 51.20 - Criteria for and identification of licensing and regulatory actions requiring environmental...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... design capacity license to operate an isotopic enrichment plant pursuant to part 50 of this chapter. (4... uranium enrichment facility. (11) Issuance of renewal of a license authorizing receipt and disposal of...

  14. 76 FR 40617 - Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Near Hackberry, LA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ...) vertical lift bridge across the Gulf Intracoastal Waterway, mile 243.8 west of Harvey Lock, near Hackberry... work from the operating schedule for the vertical lift bridge on the SR 27 (Ellender Ferry) across the...

  15. Creating Near-Term Climate Scenarios for AgMIP

    NASA Astrophysics Data System (ADS)

    Goddard, L.; Greene, A. M.; Baethgen, W.

    2012-12-01

    For the next assessment report of the IPCC (AR5), attention is being given to development of climate information that is appropriate for adaptation, such as decadal-scale and near-term predictions intended to capture the combined effects of natural climate variability and the emerging climate change signal. While the science and practice evolve for the production and use of dynamic decadal prediction, information relevant to agricultural decision-makers can be gained from analysis of past decadal-scale trends and variability. Statistical approaches that mimic the characteristics of observed year-to-year variability can indicate the range of possibilities and their likelihood. In this talk we present work towards development of near-term climate scenarios, which are needed to engage decision-makers and stakeholders in the regions in current decision-making. The work includes analyses of decadal-scale variability and trends in the AgMIP regions, and statistical approaches that capture year-to-year variability and the associated persistence of wet and dry years. We will outline the general methodology and some of the specific considerations in the regional application of the methodology for different AgMIP regions, such those for Western Africa versus southern Africa. We will also show some examples of quality checks and informational summaries of the generated data, including (1) metrics of information quality such as probabilistic reliability for a suite of relevant climate variables and indices important for agriculture; (2) quality checks relative to the use of this climate data in crop models; and, (3) summary statistics (e.g., for 5-10-year periods or across given spatial scales).

  16. Air Traffic Management Technology Demostration Phase 1 (ATD) Interval Management for Near-Term Operations Validation of Acceptability (IM-NOVA) Experiment

    NASA Technical Reports Server (NTRS)

    Kibler, Jennifer L.; Wilson, Sara R.; Hubbs, Clay E.; Smail, James W.

    2015-01-01

    The Interval Management for Near-term Operations Validation of Acceptability (IM-NOVA) experiment was conducted at the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) in support of the NASA Airspace Systems Program's Air Traffic Management Technology Demonstration-1 (ATD-1). ATD-1 is intended to showcase an integrated set of technologies that provide an efficient arrival solution for managing aircraft using Next Generation Air Transportation System (NextGen) surveillance, navigation, procedures, and automation for both airborne and ground-based systems. The goal of the IMNOVA experiment was to assess if procedures outlined by the ATD-1 Concept of Operations were acceptable to and feasible for use by flight crews in a voice communications environment when used with a minimum set of Flight Deck-based Interval Management (FIM) equipment and a prototype crew interface. To investigate an integrated arrival solution using ground-based air traffic control tools and aircraft Automatic Dependent Surveillance-Broadcast (ADS-B) tools, the LaRC FIM system and the Traffic Management Advisor with Terminal Metering and Controller Managed Spacing tools developed at the NASA Ames Research Center (ARC) were integrated into LaRC's Air Traffic Operations Laboratory (ATOL). Data were collected from 10 crews of current 757/767 pilots asked to fly a high-fidelity, fixed-based simulator during scenarios conducted within an airspace environment modeled on the Dallas-Fort Worth (DFW) Terminal Radar Approach Control area. The aircraft simulator was equipped with the Airborne Spacing for Terminal Area Routes (ASTAR) algorithm and a FIM crew interface consisting of electronic flight bags and ADS-B guidance displays. Researchers used "pseudo-pilot" stations to control 24 simulated aircraft that provided multiple air traffic flows into the DFW International Airport, and recently retired DFW air traffic controllers served as confederate Center, Feeder, Final

  17. 76 FR 15826 - Fisheries of the Exclusive Economic Zone Off Alaska; Gulf of Alaska License Limitation Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... or non-trawl gear designations); and (4) designate the type of vessel operation permitted (i.e., LLP... catcher/processor). The endorsements for specific regulatory areas, gear designations, and vessel operational types are non-severable from the LLP license (i.e., once an LLP license is issued, the components...

  18. Acute Kidney Injury Classification Underestimates Long-Term Mortality After Cardiac Valve Operations.

    PubMed

    Bouma, Hjalmar R; Mungroop, Hubert E; de Geus, A Fred; Huisman, Daniel D; Nijsten, Maarten W N; Mariani, Massimo A; Scheeren, Thomas W L; Burgerhof, Johannes G M; Henning, Robert H; Epema, Anne H

    2018-03-01

    Perioperative acute kidney injury (AKI) is an important predictor of long-term all-cause mortality after coronary artery bypass (CABG). However, the effect of AKI on long-term mortality after cardiac valve operations is hitherto undocumented. Perioperative renal injury and long-term all-cause mortality after valve operations were studied in a prospective cohort of patients undergoing solitary valve operations (n=2,806) or valve operations combined with CABG (n=1,260) with up to 18 years of follow-up. Postoperative serum creatinine increase was classified according to AKI 0-3. Patients undergoing solitary CABG (n=4,938) with cardiopulmonary bypass served as reference. In both valve and valve+CABG operations, postoperative renal injury of AKI stage 1 or higher was progressively associated with an increase in long-term mortality (HR 2.27, p<0.05 for valve; HR 1.65, p<0.05 for valve operations combined with CABG; HR 1.56, p<0.05 for CABG). Notably, the mortality risk increased already substantially at serum creatinine rises of 10-25%, i.e. far below the threshold for AKI stage 1 after valve operations (HR 1.39, p<0.05), but not after valve operations combined with CABG or CABG only. An increase in serum creatinine by more than 10%during the first week following valve operation is associated with an increased risk for long-term mortality following cardiac valve operation. Thus, AKI-classification clearly underestimates long-term mortality risk in patients undergoing valve operations. Copyright © 2018 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  19. Features of a Self-Mixing Laser Diode Operating Near Relaxation Oscillation.

    PubMed

    Liu, Bin; Yu, Yanguang; Xi, Jiangtao; Fan, Yuanlong; Guo, Qinghua; Tong, Jun; Lewis, Roger A

    2016-09-21

    When a fraction of the light reflected by an external cavity re-enters the laser cavity, both the amplitude and the frequency of the lasing field can be modulated. This phenomenon is called the self-mixing effect (SME). A self-mixing laser diode (SM-LD) is a sensor using the SME. Usually, such LDs operate below the stability boundary where no relaxation oscillation happens. The boundary is determined by the operation condition including the injection current, optical feedback strength and external cavity length. This paper discovers the features of an SM-LD where the LD operates beyond the stability boundary, that is, near the relaxation oscillation (RO) status. We call the signals from such a SM-LD as RO-SM signals to differentiate them from the conventional SM signals reported in the literature. Firstly, simulations are made based on the well-known Lang and Kobayashi (L-K) equations. Then the experiments are conducted on different LDs to verify the simulation results. It shows that a RO-SM signal exhibits high frequency oscillation with its amplitude modulated by a slow time varying envelop which corresponds to the movement of the external target. The envelope has same fringe structure (half-wavelength displacement resolution) with the conventional SM signals. However, the amplitudes of the RO-SM signals are much higher compared to conventional SM signals. The results presented reveal that an SM-LD operating near the RO has potential for achieving sensing with improved sensitivity.

  20. Features of a Self-Mixing Laser Diode Operating Near Relaxation Oscillation

    PubMed Central

    Liu, Bin; Yu, Yanguang; Xi, Jiangtao; Fan, Yuanlong; Guo, Qinghua; Tong, Jun; Lewis, Roger A.

    2016-01-01

    When a fraction of the light reflected by an external cavity re-enters the laser cavity, both the amplitude and the frequency of the lasing field can be modulated. This phenomenon is called the self-mixing effect (SME). A self-mixing laser diode (SM-LD) is a sensor using the SME. Usually, such LDs operate below the stability boundary where no relaxation oscillation happens. The boundary is determined by the operation condition including the injection current, optical feedback strength and external cavity length. This paper discovers the features of an SM-LD where the LD operates beyond the stability boundary, that is, near the relaxation oscillation (RO) status. We call the signals from such a SM-LD as RO-SM signals to differentiate them from the conventional SM signals reported in the literature. Firstly, simulations are made based on the well-known Lang and Kobayashi (L-K) equations. Then the experiments are conducted on different LDs to verify the simulation results. It shows that a RO-SM signal exhibits high frequency oscillation with its amplitude modulated by a slow time varying envelop which corresponds to the movement of the external target. The envelope has same fringe structure (half-wavelength displacement resolution) with the conventional SM signals. However, the amplitudes of the RO-SM signals are much higher compared to conventional SM signals. The results presented reveal that an SM-LD operating near the RO has potential for achieving sensing with improved sensitivity. PMID:27657077

  1. A Near-Term Concept for Trajectory Based Operations with Air/Ground Data Link Communication

    NASA Technical Reports Server (NTRS)

    McNally, David; Mueller, Eric; Thipphavong, David; Paielli, Russell; Cheng, Jinn-Hwei; Lee, Chuhan; Sahlman, Scott; Walton, Joe

    2010-01-01

    An operating concept and required system components for trajectory-based operations with air/ground data link for today's en route and transition airspace is proposed. Controllers are fully responsible for separation as they are today, and no new aircraft equipage is required. Trajectory automation computes integrated solutions to problems like metering, weather avoidance, traffic conflicts and the desire to find and fly more time/fuel efficient flight trajectories. A common ground-based system supports all levels of aircraft equipage and performance including those equipped and not equipped for data link. User interface functions for the radar controller's display make trajectory-based clearance advisories easy to visualize, modify if necessary, and implement. Laboratory simulations (without human operators) were conducted to test integrated operation of selected system components with uncertainty modeling. Results are based on 102 hours of Fort Worth Center traffic recordings involving over 37,000 individual flights. The presence of uncertainty had a marginal effect (5%) on minimum-delay conflict resolution performance, and windfavorable routes had no effect on detection and resolution metrics. Flight plan amendments and clearances were substantially reduced compared to today s operations. Top-of-descent prediction errors are the largest cause of failure indicating that better descent predictions are needed to reliably achieve fuel-efficient descent profiles in medium to heavy traffic. Improved conflict detections for climbing flights could enable substantially more continuous climbs to cruise altitude. Unlike today s Conflict Alert, tactical automation must alert when an altitude amendment is entered, but before the aircraft starts the maneuver. In every other failure case tactical automation prevented losses of separation. A real-time prototype trajectory trajectory-automation system is running now and could be made ready for operational testing at an en route

  2. Kirkland gets license in hot Philippines area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirkland, A.S.

    1992-08-03

    This paper reports that Kirkland As, Oslo, has received a geophysical survey and exploration contract (GSEC) in a sizzling exploration and development theater off the Philippines. The license covers about 6,000 sq miles of undisputed waters, with depths mostly less than 300 ft, and lies in the Reed Bank area off Northwest Palawan Island, where several major oil and gas strikes have been made recently. Kirkland has 1 year in which to carry out its seismic work commitment. The terms of the GSEC then give an option to drill one well in a 6 month period. Once the results havemore » been analyzed, the company can either drill another well or enter into a service contract for the license. Kirkland has a 65% share in the license, with the remainder split between Philippine companies Philodrill Corp., Beguet Mining Corp. subsidiary Petrofields, and Seafront Resources Corp. The Philippines is one of Kirkland's main areas of activity, the Kirkland Commercial Manager Ralph Baxter.« less

  3. Rapid DNA replication origin licensing protects stem cell pluripotency

    PubMed Central

    Matson, Jacob Peter; Dumitru, Raluca; Coryell, Philip; Baxley, Ryan M; Chen, Weili; Twaroski, Kirk; Webber, Beau R; Tolar, Jakub; Bielinsky, Anja-Katrin; Purvis, Jeremy E

    2017-01-01

    Complete and robust human genome duplication requires loading minichromosome maintenance (MCM) helicase complexes at many DNA replication origins, an essential process termed origin licensing. Licensing is restricted to G1 phase of the cell cycle, but G1 length varies widely among cell types. Using quantitative single-cell analyses, we found that pluripotent stem cells with naturally short G1 phases load MCM much faster than their isogenic differentiated counterparts with long G1 phases. During the earliest stages of differentiation toward all lineages, MCM loading slows concurrently with G1 lengthening, revealing developmental control of MCM loading. In contrast, ectopic Cyclin E overproduction uncouples short G1 from fast MCM loading. Rapid licensing in stem cells is caused by accumulation of the MCM loading protein, Cdt1. Prematurely slowing MCM loading in pluripotent cells not only lengthens G1 but also accelerates differentiation. Thus, rapid origin licensing is an intrinsic characteristic of stem cells that contributes to pluripotency maintenance. PMID:29148972

  4. 31 CFR 537.310 - Licenses; general and specific.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... part or are made available on OFAC's Web site: www.treasury.gov/ofac. (c) The term specific license... part or made available on OFAC's Web site. Note to § 537.310: See § 501.801 of this chapter on...

  5. 31 CFR 558.305 - Licenses; general and specific.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... made available on OFAC's Web site: www.treasury.gov/ofac. (c) The term specific license means any... available on OFAC's Web site: www.treasury.gov/ofac. Note to § 558.305: See § 501.801 of this chapter on...

  6. An Operational Short-Term Forecasting System for Regional Hydropower Management

    NASA Astrophysics Data System (ADS)

    Gronewold, A.; Labuhn, K. A.; Calappi, T. J.; MacNeil, A.

    2017-12-01

    The Niagara River is the natural outlet of Lake Erie and drains four of the five Great lakes. The river is used to move commerce and is home to both sport fishing and tourism industries. It also provides nearly 5 million kilowatts of hydropower for approximately 3.9 million homes. Due to a complex international treaty and the necessity of balancing water needs for an extensive tourism industry, the power entities operating on the river require detailed and accurate short-term river flow forecasts to maximize power output. A new forecast system is being evaluated that takes advantage of several previously independent components including the NOAA Lake Erie operational Forecast System (LEOFS), a previously developed HEC-RAS model, input from the New York Power Authority(NYPA) and Ontario Power Generation (OPG) and lateral flow forecasts for some of the tributaries provided by the NOAA Northeast River Forecast Center (NERFC). The Corps of Engineers updated the HEC-RAS model of the upper Niagara River to use the output forcing from LEOFS and a planned Grass Island Pool elevation provided by the power entities. The entire system has been integrated at the NERFC; it will be run multiple times per day with results provided to the Niagara River Control Center operators. The new model helps improve discharge forecasts by better accounting for dynamic conditions on Lake Erie. LEOFS captures seiche events on the lake that are often several meters of displacement from still water level. These seiche events translate into flow spikes that HEC-RAS routes downstream. Knowledge of the peak arrival time helps improve operational decisions at the Grass Island Pool. This poster will compare and contrast results from the existing operational flow forecast and the new integrated LEOFS/HEC-RAS forecast. This additional model will supply the Niagara River Control Center operators with multiple forecasts of flow to help improve forecasting under a wider variety of conditions.

  7. 31 CFR 542.309 - Licenses; general and specific.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... part or made available on OFAC's Web site: www.treasury.gov/ofac. (c) The term specific license means... or made available on OFAC's Web site: www.treasury.gov/ofac. Note to § 542.309: See § 501.801 of this...

  8. 31 CFR 589.305 - Licenses; general and specific.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... part or made available on OFAC's Web site: www.treasury.gov/ofac. (c) The term specific license means... or made available on OFAC's Web site: www.treasury.gov/ofac. Note to § 589.305: See § 501.801 of this...

  9. 29 CFR 825.602 - Special rules for school employees, limitations on leave near the end of an academic term.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... near the end of an academic term. 825.602 Section 825.602 Labor Regulations Relating to Labor... on leave near the end of an academic term. (a) There are also different rules for instructional... days. (b) For purposes of these provisions, academic term means the school semester, which typically...

  10. 29 CFR 825.602 - Special rules for school employees, limitations on leave near the end of an academic term.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... near the end of an academic term. 825.602 Section 825.602 Labor Regulations Relating to Labor... on leave near the end of an academic term. (a) There are also different rules for instructional... days. (b) For purposes of these provisions, academic term means the school semester, which typically...

  11. Geospatial analysis of near-term potential for carbon-negative bioenergy in the United States

    PubMed Central

    Baik, Ejeong; Turner, Peter A.; Mach, Katharine J.; Field, Christopher B.; Benson, Sally M.

    2018-01-01

    Bioenergy with carbon capture and storage (BECCS) is a negative-emissions technology that may play a crucial role in climate change mitigation. BECCS relies on the capture and sequestration of carbon dioxide (CO2) following bioenergy production to remove and reliably sequester atmospheric CO2. Previous BECCS deployment assessments have largely overlooked the potential lack of spatial colocation of suitable storage basins and biomass availability, in the absence of long-distance biomass and CO2 transport. These conditions could constrain the near-term technical deployment potential of BECCS due to social and economic barriers that exist for biomass and CO2 transport. This study leverages biomass production data and site-specific injection and storage capacity estimates at high spatial resolution to assess the near-term deployment opportunities for BECCS in the United States. If the total biomass resource available in the United States was mobilized for BECCS, an estimated 370 Mt CO2⋅y−1 of negative emissions could be supplied in 2020. However, the absence of long-distance biomass and CO2 transport, as well as limitations imposed by unsuitable regional storage and injection capacities, collectively decrease the technical potential of negative emissions to 100 Mt CO2⋅y−1. Meeting this technical potential may require large-scale deployment of BECCS technology in more than 1,000 counties, as well as widespread deployment of dedicated energy crops. Specifically, the Illinois basin, Gulf region, and western North Dakota have the greatest potential for near-term BECCS deployment. High-resolution spatial assessment as conducted in this study can inform near-term opportunities that minimize social and economic barriers to BECCS deployment. PMID:29531081

  12. Planning as a Precursor to Scheduling for Space Station Payload Operations

    NASA Technical Reports Server (NTRS)

    Howell, Eric; Maxwell, Theresa

    1995-01-01

    Contemporary schedulers attempt to solve the problem of best fitting a set of activities into an available timeframe while still satisfying the necessary constraints. This approach produces results which are optimized for the region of time the scheduler is able to process, satisfying the near term goals of the operation. In general the scheduler is not able to reason about the activities which precede or follow the window into which it is inputs to scheduling so that the intermediate placing activities. This creates a problem for operations which are composed of many activities spanning long durations (which exceed the scheduler's reasoning horizon) such as the continuous operations environment for payload operations on the Space Station. Not only must the near term scheduling objectives be met, but somehow the results of near term scheduling must be made to support the attainment of long term goals.

  13. Creative Commons licenses and the non-commercial condition: Implications for the re-use of biodiversity information

    PubMed Central

    Hagedorn, Gregor; Mietchen, Daniel; Morris, Robert A.; Agosti, Donat; Penev, Lyubomir; Berendsohn, Walter G.; Hobern, Donald

    2011-01-01

    Abstract The Creative Commons (CC) licenses are a suite of copyright-based licenses defining terms for the distribution and re-use of creative works. CC provides licenses for different use cases and includes open content licenses such as the Attribution license (CC BY, used by many Open Access scientific publishers) and the Attribution Share Alike license (CC BY-SA, used by Wikipedia, for example). However, the license suite also contains non-free and non-open licenses like those containing a “non-commercial” (NC) condition. Although many people identify “non-commercial” with “non-profit”, detailed analysis reveals that significant differences exist and that the license may impose some unexpected re-use limitations on works thus licensed. After providing background information on the concepts of Creative Commons licenses in general, this contribution focuses on the NC condition, its advantages, disadvantages and appropriate scope. Specifically, it contributes material towards a risk analysis for potential re-users of NC-licensed works. PMID:22207810

  14. Creative Commons licenses and the non-commercial condition: Implications for the re-use of biodiversity information.

    PubMed

    Hagedorn, Gregor; Mietchen, Daniel; Morris, Robert A; Agosti, Donat; Penev, Lyubomir; Berendsohn, Walter G; Hobern, Donald

    2011-01-01

    The Creative Commons (CC) licenses are a suite of copyright-based licenses defining terms for the distribution and re-use of creative works. CC provides licenses for different use cases and includes open content licenses such as the Attribution license (CC BY, used by many Open Access scientific publishers) and the Attribution Share Alike license (CC BY-SA, used by Wikipedia, for example). However, the license suite also contains non-free and non-open licenses like those containing a "non-commercial" (NC) condition. Although many people identify "non-commercial" with "non-profit", detailed analysis reveals that significant differences exist and that the license may impose some unexpected re-use limitations on works thus licensed. After providing background information on the concepts of Creative Commons licenses in general, this contribution focuses on the NC condition, its advantages, disadvantages and appropriate scope. Specifically, it contributes material towards a risk analysis for potential re-users of NC-licensed works.

  15. 25 CFR 141.13 - Amusement company licenses.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... licenses. (a) No person may operate a portable dance pavilion, mechanical amusement device such as a ferris... amount not exceeding ten thousand dollars ($10,000) and a personal injury and property damage liability... to the tribe and for the protection of the public against personal injury and property damage by bond...

  16. 25 CFR 141.13 - Amusement company licenses.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... licenses. (a) No person may operate a portable dance pavilion, mechanical amusement device such as a ferris... amount not exceeding ten thousand dollars ($10,000) and a personal injury and property damage liability... to the tribe and for the protection of the public against personal injury and property damage by bond...

  17. 10 CFR 55.43 - Written examination: Senior operators.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... operator will contain a representative selection of questions on the knowledge, skills, and abilities needed to perform licensed senior operator duties. The knowledge, skills, and abilities will be identified, in part, from learning objectives derived from a systematic analysis of licensed senior operator...

  18. 10 CFR 55.43 - Written examination: Senior operators.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... operator will contain a representative selection of questions on the knowledge, skills, and abilities needed to perform licensed senior operator duties. The knowledge, skills, and abilities will be identified, in part, from learning objectives derived from a systematic analysis of licensed senior operator...

  19. 10 CFR 55.43 - Written examination: Senior operators.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... operator will contain a representative selection of questions on the knowledge, skills, and abilities needed to perform licensed senior operator duties. The knowledge, skills, and abilities will be identified, in part, from learning objectives derived from a systematic analysis of licensed senior operator...

  20. 47 CFR 74.1232 - Eligibility and licensing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Translator Stations and FM Broadcast Booster Stations § 74.1232 Eligibility and licensing requirements. (a... translator station may be issued to any qualified individual, organized group of individuals, broadcast... the installation and operation of the translator are sufficiently sound to assure prompt construction...

  1. Antibiotic prophylaxis for term or near-term premature rupture of membranes: metaanalysis of randomized trials.

    PubMed

    Saccone, Gabriele; Berghella, Vincenzo

    2015-05-01

    The objective of the study was to evaluate the efficacy of antibiotic prophylaxis in women with term or near-term premature rupture of membranes. Searches were performed in MEDLINE, OVID, Scopus, ClinicalTrials.gov, the PROSPERO International Prospective Register of Systematic Reviews, EMBASE, ScienceDirect.com, MEDSCAPE, and the Cochrane Central Register of Controlled Trials with the use of a combination of key words and text words related to antibiotics, premature rupture of membranes, term, and trials from inception of each database to September 2014. We included all randomized trials of singleton gestations with premature rupture of membranes at 36 weeks or more, who were randomized to antibiotic prophylaxis or control (either placebo or no treatment). The primary outcomes included maternal chorioamnionitis and neonatal sepsis. A subgroup analysis on studies with latency more than 12 hours was planned. Before data extraction, the review was registered with the PROSPERO International Prospective Register of Systematic Reviews (registration number CRD42014013928). The metaanalysis was performed following the Preferred Reporting Item for Systematic Reviews and Meta-analyses statement. Women who received antibiotics had the same rate of chorioamnionitis (2.7% vs 3.7%; relative risk [RR], 0.73, 95% confidence interval [CI], 0.48-1.12), endometritis (0.4% vs 0.9%; RR, 0.44, 95% CI, 0.18-1.10), maternal infection (3.1% vs 4.6%; RR, 0.48, 95% CI, 0.19-1.21), and neonatal sepsis (1.0% vs 1.4%; RR, 0.69, 95% CI, 0.34-1.39). In the planned subgroup analysis, women with latency longer than 12 hours, who received antibiotics, had a lower rate of chorioamnionitis (2.9% vs 6.1%; RR, 0.49, 95% CI, 0.27-0.91) and endometritis (0% vs 2.2%; RR, 0.12, 95% CI, 0.02-0.62) compared with the control group. Antibiotic prophylaxis for term or near-term premature rupture of membranes is not associated with any benefits in either maternal or neonatal outcomes. In women with latency longer

  2. Developing an Onboard Traffic-Aware Flight Optimization Capability for Near-Term Low-Cost Implementation

    NASA Technical Reports Server (NTRS)

    Wing, David J.; Ballin, Mark G.; Koczo, Stefan, Jr.; Vivona, Robert A.; Henderson, Jeffrey M.

    2013-01-01

    The concept of Traffic Aware Strategic Aircrew Requests (TASAR) combines Automatic Dependent Surveillance Broadcast (ADS-B) IN and airborne automation to enable user-optimal in-flight trajectory replanning and to increase the likelihood of Air Traffic Control (ATC) approval for the resulting trajectory change request. TASAR is designed as a near-term application to improve flight efficiency or other user-desired attributes of the flight while not impacting and potentially benefiting ATC. Previous work has indicated the potential for significant benefits for each TASAR-equipped aircraft. This paper will discuss the approach to minimizing TASAR's cost for implementation and accelerating readiness for near-term implementation.

  3. A New Look at the GEO and Near-GEO Regimes: Operations, Disposals, and Debris

    NASA Technical Reports Server (NTRS)

    Johnson, Nicholas

    2011-01-01

    Since 1963 more than 900 spacecraft and more than 200 launch vehicle upper stages have been inserted into the vicinity of the geosynchronous regime. Equally important, more than 300 spacecraft have been maneuvered into disposal orbits at mission termination to alleviate unnecessary congestion in the finite GEO region. However, the number of GEO satellites continues to grow, and evidence exists of a substantial small debris population. In addition, the operational modes of an increasing number of GEO spacecraft differ from those of their predecessors of several decades ago, including more frequent utilization of inclined and eccentric geosynchronous orbits. Consequently, the nature of the GEO regime and its immediate surroundings is evolving from well-known classical characteristics. This paper takes a fresh look at the GEO satellite population and the near- and far-term environmental implications of the region, including the effects of national and international debris mitigation measures.

  4. Intraoperative near-infrared fluorescent imaging during robotic operations.

    PubMed

    Macedo, Antonio Luiz de Vasconcellos; Schraibman, Vladimir

    2016-01-01

    The intraoperative identification of certain anatomical structures because they are small or visually occult may be challenging. The development of minimally invasive surgery brought additional difficulties to identify these structures due to the lack of complete tactile sensitivity. A number of different forms of intraoperative mapping have been tried. Recently, the near-infrared fluorescence imaging technology with indocyanine green has been added to robotic platforms. In addition, this technology has been tested in several types of operations, and has advantages such as safety, low cost and good results. Disadvantages are linked to contrast distribution in certain clinical scenarios. The intraoperative near-infrared fluorescent imaging is new and promising addition to robotic surgery. Several reports show the utility of this technology in several different procedures. The ideal dose, time and site for dye injection are not well defined. No high quality evidence-based comparative studies and long-term follow-up outcomes have been published so far. Initial results, however, are good and safe. RESUMO A identificação intraoperatória de certas estruturas anatômicas, por seu tamanho ou por elas serem ocultas à visão, pode ser desafiadora. O desenvolvimento da cirurgia minimamente invasiva trouxe dificuldades adicionais, pela falta da sensibilidade tátil completa. Diversas formas de detecção intraoperatória destas estruturas têm sido tentadas. Recentemente, a tecnologia de fluorescência infravermelha com verde de indocianina foi associada às plataformas robóticas. Além disso, essa tecnologia tem sido testada em uma variedade de cirurgias, e suas vantagens parecem estar ligadas a baixo custo, segurança e bons resultados. As desvantagens estão associadas à má distribuição do contraste em determinados cenários. A imagem intraoperatória por fluorescência infravermelha é uma nova e promissora adição à cirurgia robótica. Diversas séries mostram

  5. 78 FR 15747 - Charlissa C. Smith (Denial of Senior Reactor Operator License)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-12

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 55-23694-SP; ASLBP No. 13-925-01-SP-BD01] Charlissa C... Reconstitution Pursuant to 10 CFR 2.313(c) and 2.321(b), the Atomic Safety and Licensing Board (Board) in the above-captioned Charlissa C. Smith case is hereby reconstituted because Administrative Judge Alan S...

  6. A Modern Operating System for Near-real-time Environmental Observatories

    NASA Astrophysics Data System (ADS)

    Orcutt, John; Vernon, Frank

    2014-05-01

    The NSF Ocean Observatory Initiative (OOI) provided an opportunity for expanding the capabilities for managing open, near-real-time (latencies of seconds) data from ocean observatories. The sensors deployed in this system largely return data from seafloor, cabled fiber optic cables as well as satellite telemetry. Bandwidth demands range from high-definition movies to the transmission of data via Iridium satellite. The extended Internet also provides an opportunity to not only return data, but to also control the sensors and platforms that comprise the observatory. The data themselves are openly available to any users. In order to provide heightened network security and overall reliability, the connections to and from the sensors/platforms are managed without Layer 3 of the Internet, but instead rely upon message passing using an open protocol termed Advanced Queuing Messaging Protocol (AMQP). The highest bandwidths in the system are in the Regional Scale Network (RSN) off Oregon and Washington and on the continent with highly reliable network connections between observatory components at 10 Gbps. The maintenance of metadata and life cycle histories of sensors and platforms is critical for providing data provenance over the years. The integrated cyberinfrastructure is best thought of as an operating system for the observatory - like the data, the software is also open and can be readily applied to new observatories, for example, in the rapidly evolving Arctic.

  7. Assuring the Quality of Licensing and Certification Programs.

    ERIC Educational Resources Information Center

    Shimberg, Benjamin

    When one considers the importance and social significance of licensing and certification examinations, it is amazing that the enterprise operates with virtually no societal oversight. The "Standards for Educational and Psychological Testing" and the "Code of Fair Testing Practices in Education" of the American Psychological…

  8. 76 FR 33757 - Ocean Transportation Intermediary License; Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... Club Drive, Bensenville, IL 60106. Officers: Dale Jordon, Director (Operations), (Qualifying Individual...), Application Type: Add OFF Service. Oceanic Link USA LLC (NVO & OFF), 5430 Jimmy Carter Blvd., Suite 216... NVO & OFF License. The Ultimate Logistics Service Corporation (NVO & OFF), 3 Birch Place, Pine Brook...

  9. Differences in liquor prices between control state-operated and license-state retail outlets in the United States.

    PubMed

    Siegel, Michael; DeJong, William; Albers, Alison B; Naimi, Timothy S; Jernigan, David H

    2013-02-01

    This study aims to compare the average price of liquor in the United States between retail alcohol outlets in states that have a monopoly ('control' states) with those that do not ('licence' states). A cross-sectional study of brand-specific alcohol prices in the United States. We determined the average prices in February 2012 of 74 brands of liquor among the 13 control states that maintain a monopoly on liquor sales at the retail level and among a sample of 50 license-state liquor stores, using their online-available prices. We calculated average prices for 74 brands of liquor by control versus license state. We used a random-effects regression model to estimate differences between control and license state prices-overall and by alcoholic beverage type. We also compared prices between the 13 control states. The overall mean price for the 74 brands was $27.79 in the license states [95% confidence interval (CI): $25.26-30.32] and $29.82 in the control states (95% CI: $26.98-32.66). Based on the random-effects linear regression model, the average liquor price was approximately $2 lower (6.9% lower) in license states. In the United States monopoly of alcohol retail outlets appears to be associated with slightly higher liquor prices. © 2012 The Authors, Addiction © 2012 Society for the Study of Addiction.

  10. Differences in liquor prices between control state-operated and license-state retail outlets in the U.S.

    PubMed Central

    Siegel, Michael; DeJong, William; Albers, Alison B.; Naimi, Timothy S.; Jernigan, David H.

    2012-01-01

    Aims This study aims to compare the average price of liquor in the United States between retail alcohol outlets in states that have a monopoly ('control' states) with those that do not ('licence' states). Design A cross-sectional study of brand-specific alcohol prices in the United States. Setting We determined the average prices in February 2012 of 74 brands of liquor among the 13 control states that maintain a monopoly on liquor sales at the retail level and among a sample of 50 license-state liquor stores, using their online-available prices. Measurements We calculated average prices for 74 brands of liquor by control vs. license state. We used a random effects regression model to estimate differences between control and license state prices – overall and by alcoholic beverage type. We also compared prices between the 13 control states. Findings The overall mean price for the 74 brands was $27.79 in the license states (95% confidence interval [CI], $25.26–$30.32) and $29.82 in the control states (95% CI, $26.98–$32.66). Based on the random effects linear regression model, the average liquor price was approximately two dollars lower (6.9% lower) in license states. Conclusions In the United States monopoly of alcohol retail outlets appears to be associated with slightly higher liquor prices. PMID:22934914

  11. Plasma metabolomic profiles predict near-term death among individuals with lower extremity peripheral arterial disease.

    PubMed

    Huang, Chiang-Ching; McDermott, Mary M; Liu, Kiang; Kuo, Ching-Hua; Wang, San-Yuan; Tao, Huimin; Tseng, Yufeng Jane

    2013-10-01

    Individuals with peripheral arterial disease (PAD) have a nearly two-fold increased risk of all-cause and cardiovascular disease mortality compared to those without PAD. This pilot study determined whether metabolomic profiling can accurately identify patients with PAD who are at increased risk of near-term mortality. We completed a case-control study using (1)H NMR metabolomic profiling of plasma from 20 decedents with PAD, without critical limb ischemia, who had blood drawn within 8 months prior to death (index blood draw) and within 10 to 28 months prior to death (preindex blood draw). Twenty-one PAD participants who survived more than 30 months after their index blood draw served as a control population. Results showed distinct metabolomic patterns between preindex decedent, index decedent, and survivor samples. The major chemical signals contributing to the differential pattern (between survivors and decedents) arose from the fatty acyl chain protons of lipoproteins and the choline head group protons of phospholipids. Using the top 40 chemical signals for which the intensity was most distinct between survivor and preindex decedent samples, classification models predicted near-term all-cause death with overall accuracy of 78% (32/41), a sensitivity of 85% (17/20), and a specificity of 71% (15/21). When comparing survivor with index decedent samples, the overall classification accuracy was optimal at 83% (34/41) with a sensitivity of 80% (16/20) and a specificity of 86% (18/21), using as few as the top 10 to 20 chemical signals. Our results suggest that metabolomic profiling of plasma may be useful for identifying PAD patients at increased risk for near-term death. Larger studies using more sensitive metabolomic techniques are needed to identify specific metabolic pathways associated with increased risk of near-term all-cause mortality among PAD patients. Copyright © 2013 Society for Vascular Surgery. Published by Mosby, Inc. All rights reserved.

  12. 10 CFR 55.45 - Operating tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... in the administration of the operating test by the Commission under § 55.46(b). [52 FR 9460, Mar. 25... operator licenses in accordance with paragraph (b)(1) of this section are generally similar in scope. The... that the limitations in its license and amendments are not violated. (b) Implementation—Administration...

  13. 10 CFR 55.45 - Operating tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... in the administration of the operating test by the Commission under § 55.46(b). [52 FR 9460, Mar. 25... operator licenses in accordance with paragraph (b)(1) of this section are generally similar in scope. The... that the limitations in its license and amendments are not violated. (b) Implementation—Administration...

  14. 10 CFR 55.45 - Operating tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... in the administration of the operating test by the Commission under § 55.46(b). [52 FR 9460, Mar. 25... operator licenses in accordance with paragraph (b)(1) of this section are generally similar in scope. The... that the limitations in its license and amendments are not violated. (b) Implementation—Administration...

  15. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... Commission's 1996 findings on the environmental impacts of renewing the operating license of a nuclear power.... Specifically, the final rule amends Table B-1 by redefining the number and scope of the environmental impact... is publishing Revision 1 to NUREG-1437, ``Generic Environmental Impact Statement for License Renewal...

  16. Four Facets of Privacy and Intellectual Freedom in Licensing Contracts for Electronic Journals

    ERIC Educational Resources Information Center

    Rubel, Alan; Zhang, Mei

    2015-01-01

    This is a study of the treatment of library patron privacy in licenses for electronic journals in academic libraries. We begin by distinguishing four facets of privacy and intellectual freedom based on the LIS and philosophical literature. Next, we perform a content analysis of 42 license agreements for electronic journals, focusing on terms for…

  17. Prediction of near-term breast cancer risk using a Bayesian belief network

    NASA Astrophysics Data System (ADS)

    Zheng, Bin; Ramalingam, Pandiyarajan; Hariharan, Harishwaran; Leader, Joseph K.; Gur, David

    2013-03-01

    Accurately predicting near-term breast cancer risk is an important prerequisite for establishing an optimal personalized breast cancer screening paradigm. In previous studies, we investigated and tested the feasibility of developing a unique near-term breast cancer risk prediction model based on a new risk factor associated with bilateral mammographic density asymmetry between the left and right breasts of a woman using a single feature. In this study we developed a multi-feature based Bayesian belief network (BBN) that combines bilateral mammographic density asymmetry with three other popular risk factors, namely (1) age, (2) family history, and (3) average breast density, to further increase the discriminatory power of our cancer risk model. A dataset involving "prior" negative mammography examinations of 348 women was used in the study. Among these women, 174 had breast cancer detected and verified in the next sequential screening examinations, and 174 remained negative (cancer-free). A BBN was applied to predict the risk of each woman having cancer detected six to 18 months later following the negative screening mammography. The prediction results were compared with those using single features. The prediction accuracy was significantly increased when using the BBN. The area under the ROC curve increased from an AUC=0.70 to 0.84 (p<0.01), while the positive predictive value (PPV) and negative predictive value (NPV) also increased from a PPV=0.61 to 0.78 and an NPV=0.65 to 0.75, respectively. This study demonstrates that a multi-feature based BBN can more accurately predict the near-term breast cancer risk than with a single feature.

  18. 34 CFR 395.7 - The issuance and conditions of licenses.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... licensing qualified applicants, including a provision for giving preference to blind persons who are in need... United States; and (3) Certified by the State vocational rehabilitation agency as qualified to operate a...

  19. Licensing in an international triopoly

    NASA Astrophysics Data System (ADS)

    Ferreira, Fernanda A.; Ferreira, Flávio

    2011-12-01

    We study the effects of entry of two foreign firms on domestic welfare in the presence of licensing, when the incumbent is technologically superior to the entrants. We consider two different situations: (i) the cost-reducing innovation is licensed to both entrants; (ii) the cost-reducing innovation is licensed to just one of the entrants. We analyse three kind of license: (lump-sum) fixed-fee; (per-unit) royalty; and two-part tariff, that is a combination of a fixed-fee and a royalty. We prove that a two part tariff is never an optimal licensing scheme for the incumbent. Moreover, (i) when the technology is licensed to the two entrants, the optimal contract consists of a licensing with only output royalty; and (ii) when the technology is licensed to just one of the entrants, the optimal contract consists of a licensing with only a fixed-fee.

  20. Photovoltaic water pumping applications: Assessment of the near-term market

    NASA Technical Reports Server (NTRS)

    Rosenblum, L.; Bifano, W. J.; Scudder, L. R.; Poley, W. A.; Cusick, J. P.

    1978-01-01

    Water pumping applications represent a potential market for photovoltaics. The price of energy for photovoltaic systems was compared to that of utility line extensions and diesel generators. The potential domestic demand was defined in the government, commercial/institutional and public sectors. The foreign demand and sources of funding for water pumping systems in the developing countries were also discussed briefly. It was concluded that a near term domestic market of at least 240 megawatts and a foreign market of about 6 gigawatts exist.

  1. 75 FR 32360 - Proposed Information Collection; Comment Request; Licensing of Private Remote-Sensing Space Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... Collection; Comment Request; Licensing of Private Remote-Sensing Space Systems AGENCY: National Oceanic and.... Abstract NOAA has established requirements for the licensing of private operators of remote-sensing space... Land Remote- Sensing Policy Act of 1992 and with the national security and international obligations of...

  2. 78 FR 44536 - Proposed Information Collection; Comment Request; Licensing of Private Remote-Sensing Space Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... Collection; Comment Request; Licensing of Private Remote-Sensing Space Systems AGENCY: National Oceanic and... for the licensing of private operators of remote-sensing space systems. The information in applications and subsequent reports is needed to ensure compliance with the Land Remote- Sensing Policy Act of...

  3. The Role of Near-Earth Asteroids in Long-Term Platinum Supply

    NASA Astrophysics Data System (ADS)

    Blair, B. R.

    2000-01-01

    High-grade platinum-group metal concentrations have been identified in an abundant class of near-Earth asteroids known as LL Chondrites. The potential existence of a high-value asteroid-derived mineral product is examined from an economic perspective to assess the possible impacts on long-term precious metal supply. It is hypothesized that extraterrestrial sources of platinum group metals will become available in the global marketplace in a 20-year time frame, based on current trends of growth in technology and increasing levels of human activities in near-Earth space. Current and projected trends in platinum supply and demand are cited from the relevant literature to provide an economic context and provide an example for evaluating the economic potential of future asteroid-derived precious and strategic metals.

  4. 77 FR 54934 - Government-Owned Inventions, Available for Licensing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ... Trademark Office, and are available for licensing. DATES: September 6, 2012. FOR FURTHER INFORMATION CONTACT....: ARC-16386-1: Visual Display and Comparison of Systems Operation in Different Modes; NASA Case No.: ARC-16351-1: Movable Ground Based Recovery [[Page 54935

  5. Changing mobility patterns and road mortality among pre-license teens in a late licensing country: an epidemiological study

    PubMed Central

    2013-01-01

    focus on fatalities has led to an underestimation of the magnitude of the problem because of the physical resilience of young adolescents that leads to high survival rates but probably also to long term disabilities. In addition, to explore the generalizability of these results, international comparisons among and between early and late licensing countries are necessary, especially in relation to moped riding as an alternative for car driving. PMID:23577703

  6. Changing mobility patterns and road mortality among pre-license teens in a late licensing country: an epidemiological study.

    PubMed

    Twisk, Divera; Bos, Niels; Shope, Jean T; Kok, Gerjo

    2013-04-11

    magnitude of the problem because of the physical resilience of young adolescents that leads to high survival rates but probably also to long term disabilities. In addition, to explore the generalizability of these results, international comparisons among and between early and late licensing countries are necessary, especially in relation to moped riding as an alternative for car driving.

  7. 76 FR 71034 - Ocean Transportation Intermediary License; Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean Transportation Intermediary (OTI) pursuant to section 19 of the Shipping Act of 1984 as amended (46 U.S.C..., Jamaica, NY 11434. Officer: Demba S. Ba, Owner/Member Manager (Qualifying Individual). Application Type...

  8. The Brazilian Audit Tribunal's role in improving the federal environmental licensing process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lima, Luiz Henrique, E-mail: luizhlima@terra.com.b; Magrini, Alessandra, E-mail: ale@ppe.ufrj.b; Centro de Tecnologia - Bloco C Sala 211, Ilha do Fundao, 21949-900 - Rio de Janeiro, Caixa-Postal: 68565, RJ

    This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Auditmore » Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.« less

  9. Young driver licensing: examination of population-level rates using New Jersey's state licensing database.

    PubMed

    Curry, Allison E; Pfeiffer, Melissa R; Durbin, Dennis R; Elliott, Michael R; Kim, Konny H

    2015-03-01

    Recent surveys have provided insight on the primary reasons why US teens delay licensure but are limited in their ability to estimate licensing rates and trends. State administrative licensing data are the ideal source to provide this information but have not yet been analyzed for this purpose. Our objective was to analyze New Jersey's (NJ) licensing database to: (1) describe population-based rates of licensure among 17- to 20-year-olds, overall and by gender and zip code level indicators of household income, population density, and race/ethnicity; and (2) examine recent trends in licensure. We obtained records on all licensed NJ drivers through June 2012 from the NJ Motor Vehicle Commission's licensing database and determined each young driver's age at the time of intermediate and full licensure. Data from the US Census and American Community Survey were used to estimate a fixed cohort of NJ residents who turned 17 years old in 2006-2007 (n=255,833). Licensing data were used to estimate the number of these drivers who obtained an intermediate license by each month of age (numerators) and, among those who obtained an intermediate license, time to graduation to full licensure. Overall, 40% of NJ residents-and half of those who ultimately obtained a license by age 21-were licensed within a month of NJ's minimum licensing age of 17, 64% by their 18th birthday, and 81% by their 21st birthday. Starkly different patterns of licensure were observed by socioeconomic indicators; for example, 65% of 17-year-olds residing in the highest-income zip codes were licensed in the first month of eligibility compared with 13% of residents living in the lowest-income zip codes. The younger an individual obtained their intermediate license, the earlier they graduated to a full license. Finally, the rate and timing of licensure in NJ has been relatively stable from 2006 to 2012, with at most a 1-3% point decline in rates. These findings support the growing body of literature suggesting

  10. 47 CFR 87.43 - Operation during emergency.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.43 Operation during emergency. A station may be used for emergency communications in a manner other than that specified in the station license or in the operating rules when normal...

  11. Teenagers' licensing decisions and their views of licensing policies: a national survey.

    PubMed

    Williams, Allan F

    2011-08-01

    One objective was to determine teenage licensing rates on a national basis, interest in early licensure, and reasons for delay. A second objective was to learn teenagers' opinions about licensing policies, important in states considering ways to upgrade their current licensing systems. One thousand three hundred eighty-three 15- to 18-year-olds completed an online survey in November 2010. They were drawn from a nationally representative panel of US households recruited using probability-based sampling. The panel included cell phone-only households, and Internet access was provided to those without it. Weighting procedures were applied so that the study population represented the national US population of 15- to 18-year-olds. Most teens said that they were interested in getting a license as soon as legally possible, but many had not started the process. At 16, teens were about equally divided among those who had not started, those in the learner stage, and those with a restricted or full license. At 18, 62 percent had full licenses; 22 percent had not started. For those old enough to start, lack of a car, costs, parent availability, ability to get around without a car, and being busy with other activities were leading reasons for delay. The majority of teens were not in favor of higher licensing ages. Forty-six percent thought the minimum learner age should be 16; 30 percent thought the full license age should be 18 or older. The majority approved of night (78%) and passenger (57%) restrictions, and 85 and 93 percent endorsed cell phone and texting bans, respectively. When these policies were packaged together in a single law that included an age 16 start, night, passenger, cell phone and texting bans, and a full license at age 18, 74 percent of teens were in favor. Teenagers are not as supportive of strong licensing policies as parents of teens, but there is evidence that they will support comprehensive policies likely to lead to further reductions in teen crash

  12. 47 CFR 76.616 - Operation near certain aeronautical and marine emergency radio frequencies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... emergency radio frequencies. 76.616 Section 76.616 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Technical Standards § 76.616 Operation near certain aeronautical and marine emergency radio frequencies. (a) The transmission...

  13. 78 FR 9745 - Kewaunee Power Station; Application for Amendment to Facility Operating License

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... FURTHER INFORMATION CONTACT: Karl Feintuch, Project Manager, Office of Nuclear Reactor Regulation, U.S... Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2013-03037 Filed 2-8-13; 8:45 am] BILLING CODE... NUCLEAR REGULATORY COMMISSION [Docket No. 50-305; NRC-2013-0028] Kewaunee Power Station...

  14. Photovoltaic village power application: Assessment of the near-term market

    NASA Technical Reports Server (NTRS)

    Rosenblum, L.; Bifano, W. J.; Poley, W. A.; Scudder, L. R.

    1978-01-01

    The village power application represents a potential market for photovoltaics. The price of energy for photovoltaic systems was compared to that of utility line extensions and diesel generators. The potential domestic demand was defined in both the government and commercial sectors. The foreign demand and sources of funding for village power systems in the developing countries were also discussed briefly. It was concluded that a near term domestic market of at least 12 MW min and a foreign market of about 10 GW exists.

  15. Commercial space transportation licensing : Quarterly Launch Report : special report

    DOT National Transportation Integrated Search

    1999-01-01

    In order to conduct a commercial space launch or operate a commercial launch site in the U.S., it is necessary to obtain a license from the United States government. Under the 1972 United Nations Convention on International Liability for Damage Cause...

  16. Long term hydrographic variability near Bermuda and relation to surface forcing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Joyce, T.M.

    1997-11-01

    This paper provides an extremely brief description of long-term hydrographic observations at Bermuda. The time series of observations near the island goes back to 1922. A secular increase of temperature of approximately 0.5 C per century in the deep water pressure range has been observed; this depth layer is the only one observed at Bermuda to have such a long-term increase. Decadal time scale fluctuations have also been identified, and are correlated to decadal variations in the Labrador Sea. The recent period of decreasing temperature at Bermuda may be a reflection of the increased cooling in the Labrador Sea inmore » recent years. 2 figs.« less

  17. Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel`s caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

  18. Administrative license revocation

    DOT National Transportation Integrated Search

    1996-10-01

    Administrative license revocation (ALR) : laws are based on objective chemical : tests (blood, breath, or urine), similar : to illegal per se criminal laws against : impaired driving. Administrative license : revocation allows police and driver...

  19. 10 CFR 40.27 - General license for custody and long-term care of residual radioactive material disposal sites.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... disposed. In such cases, the Commission shall grant a license permitting use of the land if it finds that... the disposal site to be licensed, including documentation on whether land and interests are owned by the United States or an Indian tribe. If the site is on Indian land, then, as specified in the Uranium...

  20. Classical boson sampling algorithms with superior performance to near-term experiments

    NASA Astrophysics Data System (ADS)

    Neville, Alex; Sparrow, Chris; Clifford, Raphaël; Johnston, Eric; Birchall, Patrick M.; Montanaro, Ashley; Laing, Anthony

    2017-12-01

    It is predicted that quantum computers will dramatically outperform their conventional counterparts. However, large-scale universal quantum computers are yet to be built. Boson sampling is a rudimentary quantum algorithm tailored to the platform of linear optics, which has sparked interest as a rapid way to demonstrate such quantum supremacy. Photon statistics are governed by intractable matrix functions, which suggests that sampling from the distribution obtained by injecting photons into a linear optical network could be solved more quickly by a photonic experiment than by a classical computer. The apparently low resource requirements for large boson sampling experiments have raised expectations of a near-term demonstration of quantum supremacy by boson sampling. Here we present classical boson sampling algorithms and theoretical analyses of prospects for scaling boson sampling experiments, showing that near-term quantum supremacy via boson sampling is unlikely. Our classical algorithm, based on Metropolised independence sampling, allowed the boson sampling problem to be solved for 30 photons with standard computing hardware. Compared to current experiments, a demonstration of quantum supremacy over a successful implementation of these classical methods on a supercomputer would require the number of photons and experimental components to increase by orders of magnitude, while tackling exponentially scaling photon loss.