Science.gov

Sample records for overhead ground wires

  1. New composite fiber-optic overhead ground wire

    NASA Astrophysics Data System (ADS)

    Nishiyama, S.; Kitayama, Y.; Ona, A.; Shimada, S.; Kikuta, T.

    1986-11-01

    A composite fiber-optic overhead ground wire (OPGW) has already been used commercially. Most of the electric power companies have the plans to establish new telecommunication networks by means of OPGW, and it is greatly needed to develop OPGW which has a maximum number of fibers for specific ground wire size with low transmission loss, easy handling and higher reliability. We have developed New OPGW, which satisfies these demands. It has the following features: (1) 18 fibers within 75 sq mm ground wire. (2) The fiber is a pure silica core and a fluorine-doped cladding single mode fiber with the average transmission loss of 0.4 dB/km at 1.3 micron. (3) Six fibers are stranded into a compact bunch and three bunches are housed in the spiral grooves of an aluminum spacer.

  2. Field trial of composite fiber-optic overhead ground wire

    NASA Astrophysics Data System (ADS)

    Kubota, S.; Kawahira, H.; Nakajima, T.; Matsubara, I.; Saito, Y.; Kitayama, Y.

    A composite fiber-optic ground wire (OPGW), which provides additional communication capabilities for system protection and control of overhead power transmission systems has been developed. After laboratory tests, the OPGW was strung along a live power transmission line in a mountainous region and has been confirmed to have sufficient performance to establish a high-speed digital transmission network able to withstand actual conditions. The field line, constructed substantially by existing techniques, has proved that the new OPGW, accessories such as clamps and joint boxes, installation technique, and on-tower splicing method can be effectively utilized to produce a protection and control system with extremely stable characteristics.

  3. Obstacle negotiation control for a mobile robot suspended on overhead ground wires by optoelectronic sensors

    NASA Astrophysics Data System (ADS)

    Zheng, Li; Yi, Ruan

    2009-11-01

    Power line inspection and maintenance already benefit from developments in mobile robotics. This paper presents mobile robots capable of crossing obstacles on overhead ground wires. A teleoperated robot realizes inspection and maintenance tasks on power transmission line equipment. The inspection robot is driven by 11 motor with two arms, two wheels and two claws. The inspection robot is designed to realize the function of observation, grasp, walk, rolling, turn, rise, and decline. This paper is oriented toward 100% reliable obstacle detection and identification, and sensor fusion to increase the autonomy level. An embedded computer based on PC/104 bus is chosen as the core of control system. Visible light camera and thermal infrared Camera are both installed in a programmable pan-and-tilt camera (PPTC) unit. High-quality visual feedback rapidly becomes crucial for human-in-the-loop control and effective teleoperation. The communication system between the robot and the ground station is based on Mesh wireless networks by 700 MHz bands. An expert system programmed with Visual C++ is developed to implement the automatic control. Optoelectronic laser sensors and laser range scanner were installed in robot for obstacle-navigation control to grasp the overhead ground wires. A novel prototype with careful considerations on mobility was designed to inspect the 500KV power transmission lines. Results of experiments demonstrate that the robot can be applied to execute the navigation and inspection tasks.

  4. 2. TYPICAL OVERHEAD WIRE CONSTRUCTION CURVE GUY WIRE ARRANGEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. TYPICAL OVERHEAD WIRE CONSTRUCTION - CURVE GUY WIRE ARRANGEMENT (ABANDONED WEST LEG OF WYE AT SIXTH AVENUE AND PINE STREET) - Yakima Valley Transportation Company Interurban Railroad, Trackage, Yakima, Yakima County, WA

  5. 500 kV shield wires; Sectionalize or ground everywhere

    SciTech Connect

    Tuominen, M.W. )

    1992-01-01

    The primary purpose of shield wires on transmission lines in lightning protection. Development of fiber-optic shied wires added communications capabilities. Schemes for adapting fiber-optic shield wires to sectionalized shield wire designs remain untested. It is a present policy to segment and insulate 500 kV shield wires. Computer modeling and supportive field measurements have revealed a characteristic distribution of grounded tower voltage versus distance for long lines. The intent of this paper is to report these results plus predict the outcome of grounding shield wires on transmission lines already in place. Shield wires are often called overhead ground wires and abbreviated OHGW.

  6. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  7. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  8. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  9. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  10. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  11. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits,...

  12. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits,...

  13. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will...

  14. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will...

  15. Determining damping characteristics of railway-overhead-wire system for finite-element analysis

    NASA Astrophysics Data System (ADS)

    Zou, Dong; Zhang, Wei Hua; Li, Rui Ping; Zhou, Ning; Mei, Gui Ming

    2016-07-01

    In order to investigate the damping characteristics of railway-overhead-wire systems, we propose herein an approach based on the continuous wavelet transform (CWT) and two existing formulas concerning Rayleigh damping coefficients (RDCs). In the proposed process, the displacement histories of a real catenary are first obtained by using a set of noncontact photogrammetric devices, following which an exclusive catenary damping ratio related to the first dominant modal component in the catenary response is identified through a complex Morlet CWT. Thereafter, iterative finite-element analysis is conducted to find the optimal RDCs, which involves using two related formulas and the similarity between the catenary displacements obtained by simulation and experimentation. The results of our study demonstrate that this combined approach is constructive, especially for structures with closely spaced modes, such as catenaries. For the case studied herein, the catenary modal damping ratio at 1.19 Hz is approximately 1%, and the mass and stiffness proportional Rayleigh damping coefficients are approximately 0.02845 and 0.00274, respectively.

  16. Polarization dynamics in optical ground wire network.

    PubMed

    Leeson, Jesse; Bao, Xiaoyi; Côté, Alain

    2009-04-20

    We report the polarization dynamics in an optical ground wire (OPGW) network for a summer period and a fall period for what is believed to be the first time. To better observe the surrounding magnetic fields contribution to modulating the state of polarization (SOP) we installed a Faraday rotating mirror to correct reciprocal birefringence from quasi-static changes. We also monitored the OPGW while no electrical current was present in the towers' electrical conductors. The spectral analysis, the arc length mapped out over a given time interval on a Poincaré sphere, histograms of the arc length, and the SOP autocorrelation function are calculated to analyze the SOP changes. Ambient temperature changes, wind, Sun-induced temperature gradients, and electrical current all have a significant impact on the SOP drift in an OPGW network. Wind-generated cable oscillations and Sun-induced temperature gradients are shown to be the dominant slow SOP modulations, while Aeolian vibrations and electrical current are shown to be the dominant fast SOP modulations. The spectral analysis revealed that the electrical current gives the fastest SOP modulation to be 300 Hz for the sampling frequency of 1 KHz. This has set the upper speed limit for real-time polarization mode dispersion compensation devices. PMID:19381169

  17. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power...

  18. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power...

  19. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power...

  20. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power...

  1. Detail of wire ground screen in relation to towers, looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of wire ground screen in relation to towers, looking southeast - Over-the-Horizon Backscatter Radar Network, Tulelake Radar Site Receive Sector Five Antenna Array, Unnamed Road West of Double Head Road, Tulelake, Siskiyou County, CA

  2. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  3. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  4. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  5. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  6. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  7. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  8. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  9. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  10. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  11. 30 CFR 77.704-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AREAS OF UNDERGROUND COAL MINES Grounding § 77.704-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such systems may be used as a grounding medium....

  12. 30 CFR 77.704-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AREAS OF UNDERGROUND COAL MINES Grounding § 77.704-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such systems may be used as a grounding medium....

  13. 30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding... may be used as a grounding medium....

  14. 30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding... may be used as a grounding medium....

  15. DC wiring system grounding and ground fault protection issues for central station photovoltaic power plants

    NASA Technical Reports Server (NTRS)

    Simburger, E. J.

    1983-01-01

    The DC wiring system for a photovoltaic power plant presents a number of unique challenges to be overcome by the plant designers. There are a number of different configurations that the grounding of the DC wiring system can take, and the choice will affect the number and type of protective devices required to ensure safety of personnel and protection of equipment. The major grounding and fault protection considerations that must be taken into account when selecting the basic overall circuit configuration are summarized. The inherent advantages and disadvantages of each type of circuit grounding (resistance or solid) along with the personnel safety and equipment protection issues for each of these grounding methods are presented.

  16. New method for lightning location using optical ground wire

    NASA Astrophysics Data System (ADS)

    Qin, Zhaoyu; Cheng, Zhaogu; Zhang, Zhiping; Zhu, Jianqiang; Li, Feng

    2006-12-01

    A new technology of lightning location is described, which is based on detecting the state of polarization (SOP) fluctuation of the laser light in the optic ground wire (OPGW). Compared with the conventional lightning location method, the new method is more accurate, more stable, and cheaper. Theories of Stokes parameters and Poincare sphere are introduced to analyze the SOP at the lightning strike point. It can be concluded that although the initial points of SOP on the Poincare sphere are random, the SOP fluctuation generated by lightning strike can still be accurately identified by detecting the velocity of polarization motion. A new algorithm to quantify the velocity is also introduced.

  17. Optical ground wire for Hydro-Quebec`s telecommunication network

    SciTech Connect

    Ghannoum, E.; Chouteau, J.P.; Miron, M.; Yaacoub, S.; Yoshida, K.

    1995-10-01

    An extensive telecommunication network of 6,000 km of Optical Ground Wire (OPGW) is currently planned by Hydro-Quebec for progressive installation from 1992 to 2004. By 1994, about 1,600 km of OPGW have already been purchased and installed mostly on new 735 kV lines. This document provides information relative to the OPGW selection, characteristics, design, fabrication, and testing. Other sections are devoted to the installation experience, description of current and future R and D OPGW projects, and Authors` biography.

  18. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Approved ground check systems not employing... Low- and Medium-Voltage Alternating Current Circuits § 75.902-2 Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires will be approved only...

  19. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Approved ground check systems not employing... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot... includes a fail safe design causing the circuit breaker to open when ground continuity is broken....

  20. 30 CFR 77.705 - Guy wires; grounding.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Grounding... securely connected to the system ground or be provided with insulators installed near the pole end....

  1. 30 CFR 77.705 - Guy wires; grounding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Grounding... securely connected to the system ground or be provided with insulators installed near the pole end....

  2. OVERHEAD PROJECTION.

    ERIC Educational Resources Information Center

    HARTSELL, HORACE C.; VEENENDAAL, W.L.

    THE OVERHEAD PROJECTOR WAS DESIGNED TO FILL A RECOGNIZED NEED IN VISUAL COMMUNICATION. IT IS A TRANSPARENT, STILL PROJECTOR CAPABLE OF ENLARGING UP TO 10" X 10" TRANSPARENCIES. BY LOCATING THE PROJECTOR AT THE FRONT OF THE CLASSROOM ITS USE MAY BE MULTIPLIED. THE SIZE OF THE MATERIAL CAN BE EASILY AND QUICKLY CHANGED, SHAPES CAN BE PRESENTED AND…

  3. Transient corona effects on a wire over the ground

    NASA Technical Reports Server (NTRS)

    Chen, K. C.

    1980-01-01

    The nuclear EMP effect on VLF/trailing wire antennas is investigated in relation to new features of corona effects. Previous experimental results on transmission lines with corona under E 80 kV/cm recorded in the nanosecond time frame are analyzed. A nonlinear macroscopic model which describes a transmission line with corona is discussed. The model not only accounts for overall waveform, but also describes the sharp changes in the waveform associated with the corona onset.

  4. Transient state of polarization in optical ground wire caused by lightning and impulse current

    NASA Astrophysics Data System (ADS)

    Kurono, Masahiro; Isawa, K.; Kuribara, Masayuki

    1996-08-01

    This paper describes a transient state of polarization in an optical ground wire (OPGW) theoretically, experimentally and with field measurements in lightning conditions, which is considered one of the fastest phenomena of polarization fluctuations in the natural environment. These characteristics will be required for optical coherent communication for utilities in future and for application to sensing of lightning with OPGW.

  5. Hybrid modelling of near-field coupling onto grounded wire under ultra-short duration perturbation

    NASA Astrophysics Data System (ADS)

    Ravelo, B.; Liu, Y.

    2014-10-01

    A time-frequency (TF) hybrid model (HM) for investigating the interaction between EM near-field (NF) aggression and grounded wire is addressed. The HM is based on the combination of techniques for extracting the EM NF radiated by electronic structures and the calculation of electrical disturbances across the wire due to EM coupling. The computation method is fundamentally inspired from transmission line (TL) theory under EM illumination. The methodology including flow chart interpreting the routine algorithm based on the combination of frequency and time domain approaches is featured. An experimental result showing the EM coupling between patch antenna-wire from 1.5-3.5GHz reveals the efficiency of the HM in frequency domain. The relevance of this HM was illustrated with a structure comprised of 20cm aggressor and 5cm victim I-shaped wires placed above a planar ground plane. The aggressor was excited with 40ns duration perturbation signal. After Matlab implementation of the HM, the disturbance voltages across the extremity of the victim wire were extracted. This simple and fast HM is useful for the EMC engineering during the design and fabrication phases of electrical and electronic systems.

  6. The rocket-and-wire triggering process: Channel-base currents and ground-level electric fields

    NASA Astrophysics Data System (ADS)

    Ngin, Terry Keo

    Rocket-and-wire triggered lightning flashes were studied from 2011 to 2013 at the International Center for Lightning Research and Testing. Ground-level electric fields and channel-base currents were recorded for 79 rocket launches. An eight-station network of electric field meters along with a milliampere-scale wire-base current measurement and a high-speed video record of the wire ascent allowed the calculation and analysis of the trigger-wire line charge density, generally found to be in the muC m-1 to hundreds of muC m-1 range and to increase quadratically with height. The wire-base currents collected during the wire ascent here are the most comprehensive in the literature to date. The trigger-wire line charge density, electric field at ground level, and characteristics of precursor pulses at the wire tip were examined to determine their usefulness in predicting the success or failure of a triggered-lightning attempt. The usefulness of the PICASSO model of space charge evolution from ground, originally developed by researchers at Paul Sabatier University in the 1980s, as a triggering criterion was also evaluated. An electrostatic model of the corona sheath around the trigger-wire was developed in order to estimate the radial extent of the corona sheath and the charge distribution within the corona sheath as a function of measured electric fields aloft taken from the published literature. The most sensitive measurements to date of channel-base current flowing prior to subsequent return strokes, where the current had generally been considered to be zero, were collected and are analyzed here. The channel-base current before return strokes was found to average 5.3 mA with a 2.8 mA standard deviation prior to 120 measured return strokes.

  7. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Hambly, Gordon F.; Goldsmith, Robert H.

    1988-01-01

    Presented is a method of demonstrating the optical activity of glucose using an overhead projector and easily obtainable materials. Explores the difference between reflected and transmitted light (Tyndall Effect) using sodium thiosulfate, hydrochloric acid, and an overhead projector. (ML)

  8. Highly precise distributed Brillouin scattering sensor for structural health monitoring of optical ground wire cable

    NASA Astrophysics Data System (ADS)

    Zou, Lufan; Ravet, Fabien; Bao, Xiaoyi; Chen, Liang

    2004-07-01

    A distributed Brillouin scattering sensor with high special precision has been developed for the measurement of small damages/cracks of 1.5 cm. The out-layer damaged regions in an optical ground wire (OPGW) cable have been identified successfully by measuring the strain distributions every 5 cm using this technology. The stress increased to 127 kN which corresponds to more than 7500 micro-strain in the fibers. The locations of structural indentations comprising repaired and undamaged regions are found and distinguished using their corresponding strain data. The elongation of repaired region increases with time on 127 kN. These results are quantified in terms of the fiber orientation, stress, and behavior relative to undamaged sections.

  9. 9. Interior view, overhead line shafting and lathe workbench, east ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Interior view, overhead line shafting and lathe workbench, east shop, ground floor, looking northwest. - Larrabee & Hingston Company, Main Shop Building, 19 Howley Street, Peabody, Essex County, MA

  10. Computer Program for Thin Wire Antenna over a Perfectly Conducting Ground Plane. [using Galerkins method and sinusoidal bases

    NASA Technical Reports Server (NTRS)

    Richmond, J. H.

    1974-01-01

    A computer program is presented for a thin-wire antenna over a perfect ground plane. The analysis is performed in the frequency domain, and the exterior medium is free space. The antenna may have finite conductivity and lumped loads. The output data includes the current distribution, impedance, radiation efficiency, and gain. The program uses sinusoidal bases and Galerkin's method.

  11. Overhead Image Statistics

    SciTech Connect

    Vijayaraj, Veeraraghavan; Cheriyadat, Anil M; Bhaduri, Budhendra L; Vatsavai, Raju; Bright, Eddie A

    2008-01-01

    Statistical properties of high-resolution overhead images representing different land use categories are analyzed using various local and global statistical image properties based on the shape of the power spectrum, image gradient distributions, edge co-occurrence, and inter-scale wavelet coefficient distributions. The analysis was performed on a database of high-resolution (1 meter) overhead images representing a multitude of different downtown, suburban, commercial, agricultural and wooded exemplars. Various statistical properties relating to these image categories and their relationship are discussed. The categorical variations in power spectrum contour shapes, the unique gradient distribution characteristics of wooded categories, the similarity in edge co-occurrence statistics for overhead and natural images, and the unique edge co-occurrence statistics of downtown categories are presented in this work. Though previous work on natural image statistics has showed some of the unique characteristics for different categories, the relationships for overhead images are not well understood. The statistical properties of natural images were used in previous studies to develop prior image models, to predict and index objects in a scene and to improve computer vision models. The results from our research findings can be used to augment and adapt computer vision algorithms that rely on prior image statistics to process overhead images, calibrate the performance of overhead image analysis algorithms, and derive features for better discrimination of overhead image categories.

  12. Wire-grid electromagnetic modelling of metallic cylindrical objects with arbitrary section, for Ground Penetrating Radar applications

    NASA Astrophysics Data System (ADS)

    Adabi, Saba; Pajewski, Lara

    2014-05-01

    This work deals with the electromagnetic wire-grid modelling of metallic cylindrical objects, buried in the ground or embedded in a structure, for example in a wall or in a concrete slab. Wire-grid modelling of conducting objects was introduced by Richmond in 1966 [1] and, since then, this method has been extensively used over the years to simulate arbitrarily-shaped objects and compute radiation patterns of antennas, as well as the electromagnetic field scattered by targets. For any wire-grid model, a fundamental question is the choice of the optimum wire radius and grid spacing. The most widely used criterion to fix the wire size is the so-called same-area rule [2], coming from empirical observation: the total surface area of the wires has to be equal to the surface area of the object being modelled. However, just few authors have investigated the validity of this criterion. Ludwig [3] studied the reliability of the rule by examining the canonical radiation problem of a transverse magnetic field by a circular cylinder fed with a uniform surface current, compared with a wire-grid model; he concluded that the same-area rule is optimum and that too thin wires are just as bad as too thick ones. Paknys [4] investigated the accuracy of the same-area rule for the modelling of a circular cylinder with a uniform current on it, continuing the study initiated in [3], or illuminated by a transverse magnetic monochromatic plane wave; he deduced that the same-area rule is optimal and that the field inside the cylinder is most sensitive to the wire radius than the field outside the object, so being a good error indicator. In [5], a circular cylinder was considered, embedded in a dielectric half-space and illuminated by a transverse magnetic monochromatic plane wave; the scattered near field was calculated by using the Cylindrical-Wave Approach and numerical results, obtained for different wire-grid models in the spectral domain, were compared with the exact solution. The

  13. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Kolb, Doris, Ed.

    1987-01-01

    Describes several chemistry demonstrations that use an overhead projector. Some of the demonstrations deal with electrochemistry, and another deals with the reactions of nonvolatile immiscible liquid in water. (TW)

  14. Anania Shirakatsi's Overheads System

    NASA Astrophysics Data System (ADS)

    Eynatyan, Julieta

    2014-10-01

    A review of Anania Shirakatsi's overheads system is given based on his chronological works. Lunar, solar and lunisolar calendars are discussed. Anania Shirakatsi is presented as having an important role in the establishment of the Armenian unique chronology.

  15. Frequency and time domain three-dimensional inversion of electromagnetic data for a grounded-wire source

    NASA Astrophysics Data System (ADS)

    Sasaki, Yutaka; Yi, Myeong-Jong; Choi, Jihyang; Son, Jeong-Sul

    2015-01-01

    We present frequency- and time-domain three-dimensional (3-D) inversion approaches that can be applied to transient electromagnetic (TEM) data from a grounded-wire source using a PC. In the direct time-domain approach, the forward solution and sensitivity were obtained in the frequency domain using a finite-difference technique, and the frequency response was then Fourier-transformed using a digital filter technique. In the frequency-domain approach, TEM data were Fourier-transformed using a smooth-spectrum inversion method, and the recovered frequency response was then inverted. The synthetic examples show that for the time derivative of magnetic field, frequency-domain inversion of TEM data performs almost as well as time-domain inversion, with a significant reduction in computational time. In our synthetic studies, we also compared the resolution capabilities of the ground and airborne TEM and controlled-source audio-frequency magnetotelluric (CSAMT) data resulting from a common grounded wire. An airborne TEM survey at 200-m elevation achieved a resolution for buried conductors almost comparable to that of the ground TEM method. It is also shown that the inversion of CSAMT data was able to detect a 3-D resistivity structure better than the TEM inversion, suggesting an advantage of electric-field measurements over magnetic-field-only measurements.

  16. Trends of Environmental Technology of Overhead Transmission Line

    NASA Astrophysics Data System (ADS)

    Kubokawa, Hiroshi

    Movement toward extra high voltage and large capacity of overhead transmission line induces problems of wind noise and corona noise to the peripheral areas. Accordingly, environmental concern has become a critical issue of overhead transmission line construction. To reduce environmental impact, low noise overhead conductors have been developed. Meanwhile, as the environmental impact of transmission lines, there is a problem of corrosion due to intrusion of sea salt and acid rain to the inside of the wire. To reduce the environmental impact, corrosion-resistant conductors have been developed. This paper presents various environmental technologies applied to the site and future trends.

  17. Demonstrating Forces between Parallel Wires.

    ERIC Educational Resources Information Center

    Baker, Blane

    2000-01-01

    Describes a physics demonstration that dramatically illustrates the mutual repulsion (attraction) between parallel conductors using insulated copper wire, wooden dowels, a high direct current power supply, electrical tape, and an overhead projector. (WRM)

  18. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Kolb, Doris, Ed.

    1988-01-01

    Details two demonstrations for use with an overhead projector in a chemistry lecture. Includes "A Very Rapidly Growing Silicate Crystal" and "A Colorful Demonstration to Simulate Orbital Hybridization." The materials and directions for each demonstration are included as well as a brief explanation of the essential learning involved. (CW)

  19. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Kolb, Doris, Ed.

    1989-01-01

    Presents two demonstrations using the overhead projector: (1) describes how to build a projecting voltmeter and presents uses for the classroom; and (2) investigates the color of fluorescent solutions by studying the absorption and transmission of light through the solutions. (MVL)

  20. 15. INTERIOR, INSPECTION PITS, OVERHEAD CATWALKS AND OVERHEAD CRANE SUPPORT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. INTERIOR, INSPECTION PITS, OVERHEAD CATWALKS AND OVERHEAD CRANE SUPPORT, FACING WEST - Delaware, Lackawanna & Western Railroad Freight & Rail Yard, Multiple Unit Light Inspection Shed, New Jersey Transit Hoboken Terminal Rail Yard, Hoboken, Hudson County, NJ

  1. Numerical analysis of complex impedance and microwave absorption of metamaterials composed of split cut wires on grounded dielectric substrate

    NASA Astrophysics Data System (ADS)

    Lim, Jun-Hee; Liu, Tian; Kim, Sung-Soo

    2014-06-01

    The microwave absorption of metamaterials composed of split cut wire (SCW) on grounded dielectric substrate has been investigated on the basis of equivalent transmission line circuit. S-parameters (S 11 and S 21) and input impedance are numerically simulated with variations of the thickness and dielectric loss of the substrate and the geometry of the SCW. Magnetic resonance resulting from antiparallel currents between SCW and ground plane was observed at the frequency of minimum reflection loss. The simulated resonance frequency and reflection loss can be explained well on the basis of the circuit theory of an LC resonator. Analysis of the input impedance of the high impedance surface has shown that perfect absorption can be obtained at the optimized impedance-matching condition, which is dependent on SCW width, thickness and the dielectric loss of the substrate. Better insight into the absorption mechanism of metamaterial absorbers can be attained through the parametric analysis on complex impedance of SCW and its relationship with reflection loss.

  2. OMB revises overhead rules

    NASA Astrophysics Data System (ADS)

    Katzoff, Judith A.

    After pressure from university administrators, the Office of Management and Budget (OMB) has issued a new plan for saving money on research overhead costs, in place of a controversial proposal that was originally published in February 1986 (Eos, May 20, 1986, p. 481). The agency made the new plan more palatable to administrators and faculty by choosing to cap the rate of reimbursement for the activity that researchers say they find among the most difficult to document: the time they spend on administration of federally sponsored grants and contracts. An amendment to a bill signed by President Ronald Reagan on July 2 might force OMB to make additional concessions to colleges and universities.How much money the federal government would save under this policy is a matter of dispute. The agency's revisions to OMB Circular A-21, “Cost Principles for Educational Institutions,” call for fixing the reimbursement rate at 3% of modified total direct costs for departmental administration work done by “department heads, directors of divisions faculty, and professional staff.” The 3% figure represents about half of the current national average rate of reimbursement for these costs and would lead to federal government savings of $100 million a year, according to OMB.

  3. Predictive model of avian electrocution risk on overhead power lines.

    PubMed

    Dwyer, J F; Harness, R E; Donohue, K

    2014-02-01

    Electrocution on overhead power structures negatively affects avian populations in diverse ecosystems worldwide, contributes to the endangerment of raptor populations in Europe and Africa, and is a major driver of legal action against electric utilities in North America. We investigated factors associated with avian electrocutions so poles that are likely to electrocute a bird can be identified and retrofitted prior to causing avian mortality. We used historical data from southern California to identify patterns of avian electrocution by voltage, month, and year to identify species most often killed by electrocution in our study area and to develop a predictive model that compared poles where an avian electrocution was known to have occurred (electrocution poles) with poles where no known electrocution occurred (comparison poles). We chose variables that could be quantified by personnel with little training in ornithology or electric systems. Electrocutions were more common at distribution voltages (≤ 33 kV) and during breeding seasons and were more commonly reported after a retrofitting program began. Red-tailed Hawks (Buteo jamaicensis) (n = 265) and American Crows (Corvus brachyrhynchos) (n = 258) were the most commonly electrocuted species. In the predictive model, 4 of 14 candidate variables were required to distinguish electrocution poles from comparison poles: number of jumpers (short wires connecting energized equipment), number of primary conductors, presence of grounding, and presence of unforested unpaved areas as the dominant nearby land cover. When tested against a sample of poles not used to build the model, our model distributed poles relatively normally across electrocution-risk values and identified the average risk as higher for electrocution poles relative to comparison poles. Our model can be used to reduce avian electrocutions through proactive identification and targeting of high-risk poles for retrofitting. PMID:24033371

  4. Measurement of SIFT operating system overhead

    NASA Technical Reports Server (NTRS)

    Palumbo, D. L.; Butler, R. W.

    1985-01-01

    The overhead of the software implemented fault tolerance (SIFT) operating system was measured. Several versions of the operating system evolved. Each version represents different strategies employed to improve the measured performance. Three of these versions are analyzed. The internal data structures of the operating systems are discussed. The overhead of the SIFT operating system was found to be of two types: vote overhead and executive task overhead. Both types of overhead were found to be significant in all versions of the system. Improvements substantially reduced this overhead; even with these improvements, the operating system consumed well over 50% of the available processing time.

  5. Spectroscopy on the Overhead Projector.

    ERIC Educational Resources Information Center

    Solomon, Sally; And Others

    1994-01-01

    Any overhead projector easily can be converted into a simple spectrometer by placing a piece of diffraction grating over the projecting lens. A detailed description of the apparatus and suggested spectroscopy experiments are included. Demonstrations can utilize solutions of cobalt chloride, potassium permanganate, potassium dichromate, or…

  6. The Overhead Projector = Le Retroprojecteur.

    ERIC Educational Resources Information Center

    Babin, Patrick; And Others

    This guide is designed to provide educators with basic information on both the proper utilization of the overhead projector and the preparation of good visual materials. Focusing on the mechanical aspects, the first section briefly outlines how to handle problems with the projector lamp, and provides information on general maintenance, proper…

  7. 30 CFR 1220.012 - Overhead allowance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OIL AND GAS LEASES § 1220.012 Overhead allowance. (a) During the capital recovery period the overhead... under § 1220.011(c) that are salvaged, returned, or used for the benefit of non-NPSL operations....

  8. Overhead transparency skills for perioperative nurse educators.

    PubMed

    Beitz, J M

    1996-10-01

    Successful design of creative overhead transparencies should be part of the instructional repertoire of perioperative educators. Personal computers and user-friendly software have revolutionized overhead transparencies' dynamic, imaginative production. This article reviews the advantages and disadvantages of overhead projection, presents practical suggestions for generating and using transparencies, and displays computer designed examples. PMID:8893964

  9. THE OVERHEAD PROJECTOR IN THE PHYSICS LECTURE.

    ERIC Educational Resources Information Center

    EPPENSTEIN, WALTER

    SOME SUCCESSFUL APPLICATIONS OF OVERHEAD PROJECTORS IN THE PHYSICS LECTURE HALL AT RENSSELAER POLYTECHNIC INSTITUTE ARE DESCRIBED--(1) PRODUCTION AND USE OF TRANSPARENCIES, (2) THE OVERHEAD PROJECTOR IN THE DEMONSTRATION LECTURE, (3) BREAD-BOARD FOR ELECTRICAL CONNECTIONS, AND (4) AN X-Y PLOTTER FOR THE OVERHEAD PROJECTOR. (MS)

  10. Overhead View of Pathfinder Landing Site

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Planimetric (overhead view) map of the landing site, to a distance of 20 meters from the spacecraft. North is at the top in this and Plates 3-5. To produce this map, images were geometrically projected onto an assumed mean surface representing the ground. Features above the ground plane (primarily rocks) therefore appear displaced radially outward; the amount of distortion increases systematically with distance. The upper surfaces of the lander and rover also appear enlarged and displaced because of their height. Primary grid (white) is based on the Landing Site Cartographic (LSC) coordinate system, defined with X eastward, Y north, and Z up, and origin located at the mean ground surface immediately beneath the deployed position of the IMP camera gimbal center. Secondary ticks (cyan) are based on the Mars local level (LL) frame, which has X north, Y east, Z down, with origin in the center of the lander baseplate. Rover positions (including APXS measurements) are commonly reported in the LL frame. Yellow grid shows polar coordinates based on the LSC system. Cartographic image processing by U.S. Geological Survey.

    NOTE: original caption as published in Science Magazine

    Mars Pathfinder is the second in NASA's Discovery program of low-cost spacecraft with highly focused science goals. The Jet Propulsion Laboratory, Pasadena, CA, developed and manages the Mars Pathfinder mission for NASA's Office of Space Science, Washington, D.C. JPL is a division of the California Institute of Technology (Caltech).

  11. Behavioral economics. Avoiding overhead aversion in charity.

    PubMed

    Gneezy, Uri; Keenan, Elizabeth A; Gneezy, Ayelet

    2014-10-31

    Donors tend to avoid charities that dedicate a high percentage of expenses to administrative and fundraising costs, limiting the ability of nonprofits to be effective. We propose a solution to this problem: Use donations from major philanthropists to cover overhead expenses and offer potential donors an overhead-free donation opportunity. A laboratory experiment testing this solution confirms that donations decrease when overhead increases, but only when donors pay for overhead themselves. In a field experiment with 40,000 potential donors, we compared the overhead-free solution with other common uses of initial donations. Consistent with prior research, informing donors that seed money has already been raised increases donations, as does a $1:$1 matching campaign. Our main result, however, clearly shows that informing potential donors that overhead costs are covered by an initial donation significantly increases the donation rate by 80% (or 94%) and total donations by 75% (or 89%) compared with the seed (or matching) approach. PMID:25359974

  12. The fallacy of the overhead quick fix.

    PubMed

    Blaxill, M F; Hout, T M

    1991-01-01

    Facing pressure from a few large, low-cost competitors, Thornton, an old-guard specialty-equipment manufacturer, fought back by eliminating overhead. Over two-years, it outsourced components and consolidated operations. But instead of cutting overhead, it added more and became still more uncompetitive. Thornton is not alone in either its predicament or its failed reaction. Many large manufacturing companies are finding themselves at a cost disadvantage in markets they have dominated for years. One reason is excessive overhead structures, the result of an unchecked buildup of indirect employees needed to control rising organizational complexity. Another reason is the emergence of the "robust" competitor, comparable in size and product scope but able to produce at a lower unit overhead cost. Data collected from more than 100 manufacturing plants worldwide illustrate the differences between overhead cost structures of bureaucratic, niche, and robust companies. The gulf between these groups highlights the need for action by bureaucratic companies, and, in some cases, by niche companies. But high-overhead companies are doomed if they cut overhead out of the system either by outsourcing or downsizing. If they expect to retain their size and also become more cost competitive, they must rethink their manufacturing systems. Well-designed and well-controlled processes mean higher product quality, faster cycle time, improved flexibility, and lower overhead costs. Sustainable overhead reduction means a commitment to continuous improvement. This includes segmenting, mapping, and measuring existing processes and then working to improve them.(ABSTRACT TRUNCATED AT 250 WORDS) PMID:10112923

  13. The choice of optimum cross section for overhead line by economic intervals' method

    NASA Astrophysics Data System (ADS)

    Guseva, Svetlana; Petrichenko, Lubov

    2011-01-01

    In this paper an approach to choosing the optimum cross section for overhead line in conditions of incomplete and uncertain information is considered. The two methods of such choice are presented: method of economic current density and economic intervals' method. The correction of the economic intervals method is offered under market conditions of costs. As example 20 kV and 110 kV overhead lines with aluminum, copper and ferroaluminum wires are selected. Universal nomograms with different standard cross section are calculated and constructed. The graphics using Mathcad software are offered.

  14. Basic Wiring.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; And Others

    This module is the first in a series of three wiring publications; it serves as the foundation for students enrolled in a wiring program. It is a prerequisite to either "Residential Wiring" or "Commercial and Industrial Wiring." The module contains 16 instructional units that cover the following topics: occupational introduction; general safety;…

  15. 29 CFR 1926.554 - Overhead hoists.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Overhead hoists. 1926.554 Section 1926.554 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Helicopters, Hoists, Elevators, and Conveyors § 1926.554 Overhead hoists. (a)...

  16. Limiting electric fields of HVDC overhead power lines.

    PubMed

    Leitgeb, N

    2014-05-01

    As a consequence of the increased use of renewable energy and the now long distances between energy generation and consumption, in Europe, electric power transfer by high-voltage (HV) direct current (DC) overhead power lines gains increasing importance. Thousands of kilometers of them are going to be built within the next years. However, existing guidelines and regulations do not yet contain recommendations to limit static electric fields, which are one of the most important criteria for HVDC overhead power lines in terms of tower design, span width and ground clearance. Based on theoretical and experimental data, in this article, static electric fields associated with adverse health effects are analysed and various criteria are derived for limiting static electric field strengths. PMID:24573710

  17. 30 CFR 57.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Circuits powered from trolley wires. 57.12053... Electricity Surface and Underground § 57.12053 Circuits powered from trolley wires. Ground wires for lighting circuits powered from trolley wires shall be connected securely to the ground return circuit. Surface Only...

  18. 45. MACHINE SHOP NORTH/NORTHEAST INCLUDING OVERHEAD LINE SHAFTING. MOSTLY BELT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. MACHINE SHOP NORTH/NORTHEAST INCLUDING OVERHEAD LINE SHAFTING. MOSTLY BELT DRIVEN WITH ONE ROPE DRIVEN LATHE IN MIDDLE GROUND. POWER COMES FROM KNIGHT TURBINE ON FAR WALL SHOWN IN K-77, 78 (42') - Knight Foundry, 13 Eureka Street, Sutter Creek, Amador County, CA

  19. Residential Wiring.

    ERIC Educational Resources Information Center

    Taylor, Mark

    The second in a series of three curriculum packages on wiring, these materials for a five-unit course were developed to prepare postsecondary students for entry-level employment in the residential wiring trade. The five units are: (1) blueprint reading and load calculations; (2) rough-in; (3) service; (4) trim out and troubleshooting; and (5) load…

  20. Wire chamber

    DOEpatents

    Atac, Muzaffer

    1989-01-01

    A wire chamber or proportional counter device, such as Geiger-Mueller tube or drift chamber, improved with a gas mixture providing a stable drift velocity while eliminating wire aging caused by prior art gas mixtures. The new gas mixture is comprised of equal parts argon and ethane gas and having approximately 0.25% isopropyl alcohol vapor.

  1. Overhead-Aware-Best-Fit (OABF) Resource Allocation Algorithm for Minimizing VM Launching Overhead

    SciTech Connect

    Wu, Hao; Garzoglio, Gabriele; Ren, Shangping; Timm, Steven; Noh, Seo Young

    2014-11-11

    FermiCloud is a private cloud developed in Fermi National Accelerator Laboratory to provide elastic and on-demand resources for different scientific research experiments. The design goal of the FermiCloud is to automatically allocate resources for different scientific applications so that the QoS required by these applications is met and the operational cost of the FermiCloud is minimized. Our earlier research shows that VM launching overhead has large variations. If such variations are not taken into consideration when making resource allocation decisions, it may lead to poor performance and resource waste. In this paper, we show how we may use an VM launching overhead reference model to minimize VM launching overhead. In particular, we first present a training algorithm that automatically tunes a given refer- ence model to accurately reflect FermiCloud environment. Based on the tuned reference model for virtual machine launching overhead, we develop an overhead-aware-best-fit resource allocation algorithm that decides where and when to allocate resources so that the average virtual machine launching overhead is minimized. The experimental results indicate that the developed overhead-aware-best-fit resource allocation algorithm can significantly improved the VM launching time when large number of VMs are simultaneously launched.

  2. 30 CFR 220.012 - Overhead allowance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Overhead allowance. 220.012 Section 220.012 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR MINERALS REVENUE MANAGEMENT ACCOUNTING PROCEDURES FOR DETERMINING NET PROFIT SHARE PAYMENT FOR OUTER CONTINENTAL SHELF OIL AND GAS...

  3. 30 CFR 1220.012 - Overhead allowance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Overhead allowance. 1220.012 Section 1220.012 Mineral Resources OFFICE OF NATURAL RESOURCES REVENUE, DEPARTMENT OF THE INTERIOR NATURAL RESOURCES REVENUE ACCOUNTING PROCEDURES FOR DETERMINING NET PROFIT SHARE PAYMENT FOR OUTER CONTINENTAL SHELF OIL...

  4. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  5. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  6. Viewing Vertical Objects with an Overhead Projector.

    ERIC Educational Resources Information Center

    Wild, R. L.

    1988-01-01

    Discusses the use of an overhead projector for the deflection of a vertical image to a screen. Describes three demonstrations: magnetizing of a steel ball bearing and paper clip; convection currents of a hot liquid within a cold liquid; and oscillation of concentrated salt solution into fresh water. (YP)

  7. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  8. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  9. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  10. Centripetal Force on an Overhead Projector.

    ERIC Educational Resources Information Center

    Rheam, Harry

    1995-01-01

    Describes two simple demonstrations of an object moving in a straight line tangent to the circle if centripetal force is removed. Demonstrations use a pie plate and petri dish with ball bearings to illustrate the phenomena on an overhead projector. (LZ)

  11. 29 CFR 1926.955 - Overhead lines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission and Distribution § 1926.955 Overhead... event of high wind or other adverse weather conditions which would make the work hazardous. (v... procedures, work from structures shall be discontinued when adverse weather (such as high wind or ice...

  12. 29 CFR 1926.955 - Overhead lines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission and Distribution § 1926.955 Overhead... event of high wind or other adverse weather conditions which would make the work hazardous. (v... procedures, work from structures shall be discontinued when adverse weather (such as high wind or ice...

  13. 29 CFR 1926.955 - Overhead lines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission and Distribution § 1926.955 Overhead... event of high wind or other adverse weather conditions which would make the work hazardous. (v... procedures, work from structures shall be discontinued when adverse weather (such as high wind or ice...

  14. 29 CFR 1926.955 - Overhead lines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission and Distribution § 1926.955 Overhead... event of high wind or other adverse weather conditions which would make the work hazardous. (v... procedures, work from structures shall be discontinued when adverse weather (such as high wind or ice...

  15. 29 CFR 1926.955 - Overhead lines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission and Distribution § 1926.955 Overhead... event of high wind or other adverse weather conditions which would make the work hazardous. (v... procedures, work from structures shall be discontinued when adverse weather (such as high wind or ice...

  16. Overhead Projection Cell for Streamline Flow

    ERIC Educational Resources Information Center

    Waage, Harold M.

    1969-01-01

    Describes the construction and operation of an overhead projection apparatus designed to demonstrate streamline flow of a liquid. The apparatus consists of a Plexiglass tank containing water in which plates forming the cell are submerged, a constant level reservoir, an overflow device and a system for marking the flow lines with a dye. (LC)

  17. An Overhead Projection Demonstration of Optical Activity

    ERIC Educational Resources Information Center

    Hill, John W.

    1973-01-01

    Describes the use of two polarizing lenses, a yellow filter, an oatmeal bos, a piece of cardboard, a 1,000 ml beaker, and an overhead projector to demonstrate compound optical activity to large classes. Indicates the presence of an accuracy within 1-2 degrees of usually acceptable data. (CC)

  18. 29 CFR 1926.554 - Overhead hoists.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Overhead hoists. 1926.554 Section 1926.554 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes, Derricks, Hoists, Elevators, and...

  19. Wire Wise.

    ERIC Educational Resources Information Center

    Swanquist, Barry

    1998-01-01

    Discusses how today's technology is encouraging schools to invest in furnishings that are adaptable to computer use and telecommunications access. Explores issues concerning modularity, wiring management, ergonomics, durability, price, and aesthetics. (GR)

  20. Wire insulation defect detector

    NASA Technical Reports Server (NTRS)

    Greulich, Owen R. (Inventor)

    2004-01-01

    Wiring defects are located by detecting a reflected signal that is developed when an arc occurs through the defect to a nearby ground. The time between the generation of the signal and the return of the reflected signal provides an indication of the distance of the arc (and therefore the defect) from the signal source. To ensure arcing, a signal is repeated at gradually increasing voltages while the wire being tested and a nearby ground are immersed in a conductive medium. In order to ensure that the arcing occurs at an identifiable time, the signal whose reflection is to be detected is always made to reach the highest potential yet seen by the system.

  1. Ground and flight test experience with a triple redundant digital fly by wire control system. [installed in F-8C aircraft

    NASA Technical Reports Server (NTRS)

    Jarvis, C. R.; Szalai, K. J.

    1981-01-01

    A triplex digital fly by wire flight control system was developed and installed in an F-8C aircraft to provide fail operative, full authority control. Hardware and software redundancy management techniques were designed to detect and identify failures in the system. Control functions typical of those projected for future actively controlled vehicles were implemented.

  2. 18 CFR 367.52 - Overhead construction costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... amount of each overhead expenditure charged to each construction project and to each property account... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Overhead construction... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All...

  3. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Overhead drive belts. 56.14108 Section 56.14108... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts shall be guarded to contain the whipping action of a broken belt if that action could be hazardous...

  4. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Overhead drive belts. 56.14108 Section 56.14108... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts shall be guarded to contain the whipping action of a broken belt if that action could be hazardous...

  5. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Overhead drive belts. 56.14108 Section 56.14108... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts shall be guarded to contain the whipping action of a broken belt if that action could be hazardous...

  6. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead drive belts. 57.14108 Section 57.14108... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive belts shall be guarded to contain the whipping action of a broken belt if that action could be hazardous...

  7. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead drive belts. 56.14108 Section 56.14108... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts shall be guarded to contain the whipping action of a broken belt if that action could be hazardous...

  8. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Overhead drive belts. 57.14108 Section 57.14108... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive belts shall be guarded to contain the whipping action of a broken belt if that action could be hazardous...

  9. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Overhead drive belts. 57.14108 Section 57.14108... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive belts shall be guarded to contain the whipping action of a broken belt if that action could be hazardous...

  10. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Overhead drive belts. 57.14108 Section 57.14108... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive belts shall be guarded to contain the whipping action of a broken belt if that action could be hazardous...

  11. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Overhead drive belts. 56.14108 Section 56.14108... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts shall be guarded to contain the whipping action of a broken belt if that action could be hazardous...

  12. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Overhead drive belts. 57.14108 Section 57.14108... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive belts shall be guarded to contain the whipping action of a broken belt if that action could be hazardous...

  13. 30 CFR 56.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes...

  14. 30 CFR 56.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes...

  15. 30 CFR 57.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes...

  16. 30 CFR 57.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes...

  17. 30 CFR 57.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes...

  18. 30 CFR 56.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes...

  19. 30 CFR 56.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes...

  20. 30 CFR 57.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes...

  1. 30 CFR 57.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes...

  2. 30 CFR 56.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes...

  3. Common conditions in the overhead athlete.

    PubMed

    Edmonds, Eric W; Dengerink, Douglas D

    2014-04-01

    The overhead athlete is at unique risk for injury because of the mechanics associated with rapid shoulder elevation, abduction, and external rotation. Angulation of the humeral head against the posterosuperior glenoid can cause rotator cuff tendon and labral impingement. The throwing or striking motion of baseball, softball, water polo, tennis, racquetball, and volleyball may result in scapular dyskinesis, partial articular-sided supraspinatus avulsions, and posterosuperior labral tears. The SICK scapula syndrome (scapular malposition, inferior medial border prominence, coracoid pain and malposition, and dyskinesis of scapular movement) is thought to increase the risk of injury in the overhead athlete. Special physical examination maneuvers and magnetic resonance imaging may be helpful in diagnosing intra-articular pathology. Rehabilitation of injuries associated with internal impingement of the shoulder should include three basic components: strengthening, stretching, and sport-specific exercises. Arthroscopic surgery may be considered if symptoms do not improve after three months of conservative management. PMID:24695599

  4. Human Factors Engineering Guidelines for Overhead Cranes

    NASA Technical Reports Server (NTRS)

    Chandler, Faith; Delgado, H. (Technical Monitor)

    2001-01-01

    This guideline provides standards for overhead crane cabs that can be applied to the design and modification of crane cabs to reduce the potential for human error due to design. This guideline serves as an aid during the development of a specification for purchases of cranes or for an engineering support request for crane design modification. It aids human factors engineers in evaluating existing cranes during accident investigations or safety reviews.

  5. High voltage lightning grounding device

    NASA Technical Reports Server (NTRS)

    Hoffman, R. G.; Peterson, V. S.

    1971-01-01

    Grounding device insertion in wire termination cabinets and terminal block modification prevent lightning-induced high voltage transients from reaching inputs or outputs of solid state instruments and control systems. Installation minimizes wiring confusion and achieves 100 percent protection.

  6. Wiring design for the control of electromagnetic interference (EMI)

    NASA Technical Reports Server (NTRS)

    Kopasakis, George

    1995-01-01

    Wiring design is only one important aspect of EMI control. Other important areas for EMI are: circuit design, filtering, grounding, bonding, shielding, lighting, electrostatic discharge (ESD), transient suppression, and electromagnetic pulse (EMP). Topics covered include: wire magnetic field emissions at low frequencies; wire radiated magnetic field emissions at frequencies; wire design guidelines for EMI control; wire design guidelines for EMI control; high frequency emissions from cables; and pulse frequency spectra.

  7. Flexural self-damping in overhead electrical transmission conductors

    NASA Astrophysics Data System (ADS)

    Rawlins, Charles B.

    2009-06-01

    Internal damping of tensioned cables during flexure by transverse vibration is analyzed. The flexure causes relative movements between the wires or strands of the cable, movements which are constrained by friction between them. Under conditions common to vibration of overhead transmission line conductors the friction is great enough to prevent gross sliding. However, there is microslip at the edges of the interstrand contacts, so there is frictional dissipation. In addition, the frictional forces cause shear strains at the contacts with resulting material damping. An analysis is presented that connects the bodily flexure of the conductor with the internal interstrand movements and forces, and with the amounts of dissipation that occur—self-damping. Comparison of estimates based on the analysis with measured data on self-damping reveals reasonable agreement, for a limited range. Cases lying outside that range appear to be associated with treatments applied to cable samples involved in the measurements prior to testing. Possible mechanisms activated by these treatments are discussed.

  8. 24 CFR 3280.809 - Grounding.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... shall be grounded through the green-colored conductor in the supply cord or the feeder wiring to the... grounding means. (1) The green-colored grounding wire in the supply cord or permanent feeder wiring shall be... approved paint-penetrating fitting shall be used to bond terminals to chassis or other coated areas....

  9. 24 CFR 3280.809 - Grounding.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... shall be grounded through the green-colored conductor in the supply cord or the feeder wiring to the... grounding means. (1) The green-colored grounding wire in the supply cord or permanent feeder wiring shall be... approved paint-penetrating fitting shall be used to bond terminals to chassis or other coated areas....

  10. 24 CFR 3280.809 - Grounding.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... shall be grounded through the green-colored conductor in the supply cord or the feeder wiring to the... grounding means. (1) The green-colored grounding wire in the supply cord or permanent feeder wiring shall be... approved paint-penetrating fitting shall be used to bond terminals to chassis or other coated areas....

  11. 24 CFR 3280.809 - Grounding.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... shall be grounded through the green-colored conductor in the supply cord or the feeder wiring to the... grounding means. (1) The green-colored grounding wire in the supply cord or permanent feeder wiring shall be... approved paint-penetrating fitting shall be used to bond terminals to chassis or other coated areas....

  12. No Wires.

    ERIC Educational Resources Information Center

    DeLoughry, Thomas J.

    1995-01-01

    The University of California at Santa Cruz has completed a successful test of a wireless computer network that would enable students and professors to get on line from anywhere on campus. The network, linked by radio waves, could save millions of dollars in campus wiring costs and would better meet student and faculty information needs. (MSE)

  13. Shoulder Instability in the Overhead Athlete

    PubMed Central

    Nassiri, Nima; Eliasberg, Claire; Jones, Kristofer J.; McAllister, David R.; Petrigliano, Frank A.

    2015-01-01

    Objectives: Overhead athletes place extraordinary physiologic demands on the shoulder during athletic activity. Repetitive microtrauma can result in attenuation of important capsuloligamentous structures that are responsible for providing glenohumeral stability resulting in symptomatic instability. Surgical management can utilize either an arthroscopic or open approach to shoulder stabilization; however, there is a paucity of data to support a specific technique and guide surgical decision making in this unique patient population. The purpose of the present study was to determine functional outcomes, including return to play, range of motion (ROM), validated outcome scores and recurrent instability following arthroscopic and open shoulder stabilization in overhead athletes diagnosed with anterior instability. Methods: MEDLINE and the Cochrane Database of Systematic Reviews were searched. Eleven articles matched our selection criteria for randomized controlled trials in which a cohort of overhead athletes participating in sports including baseball, tennis, volleyball, and freestyle swimming, were surgically treated by capsular plication or Bankart repair through either an open or arthroscopic approach for anterior shoulder subluxation or dislocation. The studies were assessed for methodological quality and relevant data was extracted and further evaluated. Results of comparable groups of trials were pooled and mean differences as well as 95% confidence intervals were calculated for continuous outcomes. A grading schema was designed to assess return to play: return to the same level of play (Grade 1), diminished level of play (Grade 2), and failure to return to play (Grade 3). Results: In overhead athletes with anterior glenohumeral subluxation or dislocation, return to play was similar between arthroscopic and open approaches (Grade 1 = arthroscopic 72 ± 22.6%, open 68.7 ± 7.8%; Grade 2 = arthroscopic 24.2 ± 18.3%, open 34.5 ± 7.8%; Grade 3 = arthroscopic 7.2

  14. Low overhead slipless carrier phase estimation scheme.

    PubMed

    Cheng, Haiquan; Li, Yan; Kong, Deming; Zang, Jizhao; Wu, Jian; Lin, Jintong

    2014-08-25

    Two slipless schemes are compared with application to single carrier 30 Gbaud quadrature phase shift keying (QPSK) system. An equivalent linewidth model considering the phase noise induced by both the laser linewidth and fiber nonlinearity is applied in the performance analysis. The simulation results show that it is possible to mitigate cycle slip (CS) using only 0.39% pilot overhead for the proposed blind carrier phase recovery (CPR) + pilot-symbols-aided phase unwrapping (PAPU) scheme within 1 dB signal-to-noise ratio (SNR) penalty limit at the bit error ratio (BER) of 10(-3) with 4 MHz equivalent linewidth. PMID:25321277

  15. Electrical and mechanical design criteria for EHV and UHV: overhead transmission lines

    SciTech Connect

    Not Available

    1980-06-01

    The results are presented of a program devoted to the selection of electrical and mechanical design criteria and parameters for overhead power transmission lines for ac systems rated at from 345 to 1100 kV and for dc systems rated at from 600 to 1200 kV. Information is included on the environmental effects, i.e., audible noise and electric fields, of the lines, mechanical and economic requirements, safety, failures, grounding, and lightning protection. (LCL)

  16. Supercooled liquid water content profiling case studies with a new vibrating wire sonde compared to a ground-based microwave radiometer

    NASA Astrophysics Data System (ADS)

    Serke, David; Hall, Emrys; Bognar, John; Jordan, Allen; Abdo, Spencer; Baker, Kirstin; Seitel, Tom; Nelson, Marta; Ware, Randolph; McDonough, Frank; Politovich, Marcia

    2014-11-01

    An improved version of the vibrating wire sensor, used to measure supercooled cloud liquid water content, was developed by Anasphere Inc. and tested during early 2012. The sensor works on the principle that supercooled liquid will freeze to the vibrating wire and reduce the frequency at a known rate proportional to the liquid water content as the sensor rises through the cloud attached to a weather balloon and radiosonde. The disposable Anasphere sensor interfaces with an InterMet Systems iMet radiosonde. This updated sensor reduces the weight of the instrument while updating the technology when compared to the preceding balloon-borne sensor that was developed in the 1980's by Hill and Woffinden. Balloon-borne test flights were performed from Boulder, Colorado during February and March of 2012. These flights provided comparisons to integrated liquid water and profiles of liquid water content derived from a collocated multichannel microwave radiometer, built and operated by Radiometrics Corporation. Inter-comparison data such as these are invaluable for calibration, verification and validation of remote-sensing instruments. The data gathered from this sensor are potentially important to detection of icing hazards to aircraft, validation of microphysical output from numerical models, and calibrating remote sensors measuring supercooled liquid water.

  17. Add-On Shielding for Unshielded Wire

    NASA Technical Reports Server (NTRS)

    Koenig, J. C.; Billitti, J. W.; Tallon, J. M.

    1983-01-01

    Fabrication sequence used to produce compact shields slipped into place from free ends of wires already soldered into connectors at other ends. Single shields are formed into harnesses by connecting grounding jumpers. Technique is especially useful for small diameter wire attached to microminiature connectors.

  18. Overhead analysis in a surgical practice: a brief communication.

    PubMed

    Frezza, Eldo E

    2006-08-01

    Evaluating overhead is an essential part of any business, including that of the surgeon. By examining each component of overhead, the surgeon will have a better grasp of the profitability of his or her practice. The overhead discussed in this article includes health insurance, overtime, supply costs, rent, advertising and marketing, telephone costs, and malpractice insurance. While the importance of evaluating and controlling overhead in a business is well understood, few know that overhead increases do not always imply increased expenses. National standards have been provided by the Medical Group Management Association. One method of evaluating overhead is to calculate the amount spent in terms of percent of net revenue. Net revenue includes income from patients, from interest, and from insurers less refunds. Another way for surgeons to evaluate their practice is to calculate income and expenses for two years, then calculate the variance between the two years and the percentage of variance to see where they stand. PMID:16968190

  19. Method of locating ground faults

    NASA Astrophysics Data System (ADS)

    Patterson, Richard L.; Rose, Allen H.; Cull, Ronald C.

    1994-11-01

    The present invention discloses a method of detecting and locating current imbalances such as ground faults in multiwire systems using the Faraday effect. As an example, for 2-wire or 3-wire (1 ground wire) electrical systems, light is transmitted along an optical path which is exposed to magnetic fields produced by currents flowing in the hot and neutral wires. The rotations produced by these two magnetic fields cancel each other, therefore light on the optical path does not read the effect of either. However, when a ground fault occurs, the optical path is exposed to a net Faraday effect rotation due to the current imbalance thereby exposing the ground fault.

  20. Method of locating ground faults

    NASA Technical Reports Server (NTRS)

    Patterson, Richard L. (Inventor); Rose, Allen H. (Inventor); Cull, Ronald C. (Inventor)

    1994-01-01

    The present invention discloses a method of detecting and locating current imbalances such as ground faults in multiwire systems using the Faraday effect. As an example, for 2-wire or 3-wire (1 ground wire) electrical systems, light is transmitted along an optical path which is exposed to magnetic fields produced by currents flowing in the hot and neutral wires. The rotations produced by these two magnetic fields cancel each other, therefore light on the optical path does not read the effect of either. However, when a ground fault occurs, the optical path is exposed to a net Faraday effect rotation due to the current imbalance thereby exposing the ground fault.

  1. 19. DETAIL, OVERHEAD CATWALK Delaware, Lackawanna & Western Railroad ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. DETAIL, OVERHEAD CATWALK - Delaware, Lackawanna & Western Railroad Freight & Rail Yard, Multiple Unit Light Inspection Shed, New Jersey Transit Hoboken Terminal Rail Yard, Hoboken, Hudson County, NJ

  2. REACH. Residential Electrical Wiring Units.

    ERIC Educational Resources Information Center

    Ansley, Jimmy; Ennis, Mike

    As a part of the REACH (Refrigeration, Electro-Mechanical, Air-Conditioning, Heating) electromechanical cluster, this student manual contains individualized instructional units in the area of residential electrical wiring. The instructional units focus on grounded outlets, service entrance, and blueprint reading. Each unit follows a typical format…

  3. Precision wire feeder for small diameter wire

    DOEpatents

    Brandon, E.D.; Hooper, F.M.; Reichenbach, M.L.

    1992-08-11

    A device for feeding small diameter wire having a diameter less than 0.04 mm (16 mil) to a welding station includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut. 1 figure.

  4. Precision wire feeder for small diameter wire

    DOEpatents

    Brandon, Eldon D.; Hooper, Frederick M.; Reichenbach, Marvin L.

    1992-01-01

    A device for feeding small diameter wire having a diameter less than 0.04 mm (16 mil) to a welding station includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut.

  5. Cost reduction and minimization of land based on an accurate determination of fault current distribution in shield wires and grounding systems

    SciTech Connect

    Daily, W.K. ); Dawalibi, F. )

    1993-01-01

    Careful analysis of Fault Current Distribution in neutral metallic paths, Power System Protection requirements and Ground Potential Rise (GPR) evaluations were carried out at FPL's Lauderdale Power Plant and associated switchyard. These studies resulted in substantial cost savings and land utilization minimization for the power system expansions at Lauderdale Plant by confirming that the in-situ expansion and reconfiguration aimed at constructing two electrically independent substations sharing the same site and grounding system is a sound economical alternative to the construction of a new substation and associated significant site preparation and construction costs. This paper describes the methodology used to conduct this study.

  6. Mechanical behavior of a composite reinforced overhead conductor

    NASA Astrophysics Data System (ADS)

    Alawar, Ahmad

    A new type of overhead conductor with a polymer composite core is evaluated in terms of the mechanical properties and operating characteristics. The conductor is composed of trapezoidal O'-tempered aluminum wires helically wound around a hybrid glass/carbon composite core produced by pultrusion. The conductor is intended for electrical power transmission, and is designated ACCC/TW, for aluminum conductor composite core/trapezoidal wire. Measurements of core properties and conductor sag at high temperatures were compared to conventional ACSR (aluminum conductor, steel-reinforced) of the same diameter. The mechanical properties of ACCC/TW, such as the tensile strength, CTE and SAG performance, showed superiority to conventional ACSR. The ACCC/TW conductor also exhibited greater ampacity than ACSR conductor at all operating temperatures. A modification to a Numerical Sag Method for predicting conductor sag is presented that accurately predicts the observed bilinear sag behavior of composite conductors. The modified method is called the Hybrid Sag Method (HSM). It is used to predict the sag of conductors with conventional designs. The HSM predictions are compared with those obtained using a conventional graphical sag method. The HSM shows virtually the same accuracy as the graphical method for predicting sag for composite conductors operated under specific conditions. The HSM predictions of sag are validated by comparisons with experimental measurements. Tensile strength and storage modulus were measured to determine the temperature dependence of the composite core from 20°-200°C. The storage modulus was measured by dynamic mechanical analysis (DMA) and showed temperature dependence nearly identical to the tensile strength for both composites. The correlation between storage modulus and tensile strength was analyzed in terms of the temperature-dependent matrix shear strength, and the storage modulus behavior is presented as a basis for projecting the strength

  7. Reducing space overhead for independendent checkpointing

    NASA Technical Reports Server (NTRS)

    Wang, Yi-Min; Chung, Pi-Yu; Lin, In-Jen; Fuchs, W. Kent

    1992-01-01

    The main disadvantages of independent checkpointing are the possible domino effect and the associated storage space overhead for maintaining multiple checkpoints. In most previous work, it has been assumed that only the checkpoints older than the current global recovery line can be discarded. Here, we generalize a notion of recovery line to potential recovery line. Only the checkpoints belonging to at least one of the potential recovery lines cannot be discarded. By using the model of maximum-sized antichains on a partially ordered set, an efficient algorithm is developed for finding all non-discardable checkpoints, and we show that the number of non-discardable checkpoints cannot exceed N(N+1)/2, where N is the number of processors. Communication trace driven simulation for several hypercube programs is performed to show the benefit of the proposed algorithm for real applications.

  8. NIOSH alert: Request for assistance in preventing electrocutions of crane operators and crew members working near overhead power lines

    SciTech Connect

    1995-05-01

    In this alert, NIOSH warned that crane operators and crew members may be electrocuted when working near overhead power lines. Five cases were described which resulted in six electrocutions. Case 1 involved a 29 year old who pushed the crane cable on a 1 yard cement bucket into a 7,200 volt power line. Case 2 involved a 33 year old well driller who was electrocuted when a metal pipe lifted by a truck mounted crane contacted a 12,000 volt overhead power line. The third case involved a 24 year old forman for a telecommunications company who was electrocuted when he grabbed the door handle of a truck mounted crane whose boom was in contact with a 7,200 volt overhead power line. Case 4 involved a 37 year old construction laborer electrocuted while pulling a wire rope attached to a crane cable toward a load. The fifth case involved a 20 year old male truck driver and his 70 year old male employer who were electrocuted when the boom of a truck mounted crane contacted a 7,200 volt conductor of an overhead power line.

  9. Rapid Real-Time SpaceWire Emulation

    NASA Astrophysics Data System (ADS)

    Mudie, Stephen; Parkes, Steve; Dunstan, Martin

    2015-09-01

    The SpaceWire Electronic Ground Support Equipment (EGSE) test and development unit from STAR-Dundee can be used to very rapidly emulate real-time behaviour of SpaceWire equipment. The behaviour of the equipment to emulate is described in a script using a SpaceWire specific scripting language. Once configured the SpaceWire EGSE unit operates independent of software. This paper describes three camera emulation scripts to demonstrate the rapid real-time SpaceWire emulation possible using the SpaceWire EGSE.

  10. Geography via the Overhead Projector: Do It This Way, 7.

    ERIC Educational Resources Information Center

    Best, Thomas D.

    This booklet is designed to assist teachers in their use of overhead projectors when teaching geography. With the overhead technique, relationships among patterns can be suggested bit by bit on inexpensive, easily prepared overlays that are projected to sizes appropriate for a particular instructional situation. A general discussion of the…

  11. 29 CFR 1926.1438 - Overhead & gantry cranes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., except in 2-3.5.1(b), “29 CFR 1910.147” is substituted for “ANSI Z244.1.” ..., including semigantry, cantilever gantry, wall cranes, storage bridge cranes, and others having the same... installed in a facility: Overhead and gantry cranes, overhead/bridge cranes, semigantry, cantilever...

  12. 29 CFR 1926.1438 - Overhead & gantry cranes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., except in 2-3.5.1(b), “29 CFR 1910.147” is substituted for “ANSI Z244.1.” ..., including semigantry, cantilever gantry, wall cranes, storage bridge cranes, and others having the same... installed in a facility: Overhead and gantry cranes, overhead/bridge cranes, semigantry, cantilever...

  13. 29 CFR 1926.1438 - Overhead & gantry cranes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., except in 2-3.5.1(b), “29 CFR 1910.147” is substituted for “ANSI Z244.1.” ..., including semigantry, cantilever gantry, wall cranes, storage bridge cranes, and others having the same... installed in a facility: Overhead and gantry cranes, overhead/bridge cranes, semigantry, cantilever...

  14. 29 CFR 1926.1438 - Overhead & gantry cranes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., except in 2-3.5.1(b), “29 CFR 1910.147” is substituted for “ANSI Z244.1.” ..., including semigantry, cantilever gantry, wall cranes, storage bridge cranes, and others having the same... installed in a facility: Overhead and gantry cranes, overhead/bridge cranes, semigantry, cantilever...

  15. 1. EAST SIDE OF OVERHEAD BOMB TRANSPORT RACK, WITH BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EAST SIDE OF OVERHEAD BOMB TRANSPORT RACK, WITH BUILDING 343 AT LEFT AND BUILDING 328 AT RIGHT. VIEW TO WEST. - Rocky Mountain Arsenal, Overhead Bomb Transport Rack, 1580 feet South of December Seventh Avenue; 860 feet West of D Street, Commerce City, Adams County, CO

  16. Nondestructive Testing of Overhead Transmission LINES—NUMERICAL and Experimental Investigation

    NASA Astrophysics Data System (ADS)

    Kulkarni, S.; Hurlebaus, S.

    2009-03-01

    Overhead transmission lines are periodically inspected using both on-ground and helicopter-aided visual inspection. Factors including sun glare, cloud cover, close proximity to power lines and the rapidly changing visual circumstances make airborne inspection of power lines a particularly hazardous task. In this study, a finite element model is developed that can be used to create the theoretical dispersion curves of an overhead transmission line. The numerical results are then verified with experimental test using a non-contact and broadband laser detection technique. The methodology developed in this study can be further extended to a continuous monitoring system and be applied to other cable monitoring applications, such as bridge cable monitoring, which would otherwise put human inspectors at risk.

  17. Phase-Sensing Guidance for Wire-Following Vehicles

    NASA Technical Reports Server (NTRS)

    Hansen, G. R.

    1983-01-01

    Guidance system for wire-following vehicles tested successfully at speeds exceeding 50 mi/h (80 km/h) on difficult 1 mile (1.6km) course. Unlike previous sensors that compare amplitudes of signals picked up from guide wire, new system compares signal phases. Array of coils is mounted in line along front bumper of vehicle and monitors electromagnetic signal radiating from wire. Guide wire on ground beneath vehicle carrier 6- to 7-kHz alternating current.

  18. 29 CFR 1926.404 - Wiring design and protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Wiring design and protection. 1926.404 Section 1926.404... Requirements § 1926.404 Wiring design and protection. (a) Use and identification of grounded and grounding...) Power conductors below communication conductors—30 inches (762 mm) . (B) Power conductors alone or...

  19. Air-cooled overhead-valve engine

    SciTech Connect

    Shirai, T.

    1987-06-16

    This patent describes an air-cooled overhead-valve internal combustion engine. The engine is composed of a crankcase with a crankshaft, a cylinder block with a cylinder head and a combustion chamber mounted in the crankcase. At least a pair of intake and exhaust valves installed in intake and exhaust ports are formed in the cylinder head. A valve drive system mounted adjacent to the cylinder block drives the intake and exhaust valves through cam-driven push rods. An intake pipe is connected at one end of the intake port and at its opposite end to an air cleaner and a carburetor. An exhaust duct is connected at one end of the exhaust port. A flywheel is joined to the crankshaft at the other end of the output side end of the crankshaft and a cooling fan mounted on the flywheel. The improvements are where the cooling fan is housed, together with the crankcase and flywheel, in a fan casing having a pair of inlet and outlet openings bored in opposite walls. The inlet opening is located at the flywheel side of the crankshaft, while the outlet opening is located at the opposite side of the crankshaft from the flywheel. The cam-driven push rods are located in the crankcase on that side of the cylinder block far remote from where the intake pipe is connected to the intake port. The cooling fan is mounted in the fan casing in such a manner that the cooling air from the cooling fan is allowed to flow in a direction substantially parallel with the axis of the crankshaft, along the surface of the cylinder block and cylinder head.

  20. Overhead View of Area Surrounding Pathfinder

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Overhead view of the area surrounding the Pathfinder lander illustrating the Sojourner traverse. Red rectangles are rover positions at the end of sols 1-30. Locations of soil mechanics experiments, wheel abrasion experiments, and APXS measurements are shown. The A numbers refer to APXS measurements as discussed in the paper by Rieder et al. (p. 1770, Science Magazine, see image note). Coordinates are given in the LL frame.

    The photorealistic, interactive, three-dimensional virtual reality (VR) terrain models were created from IMP images using a software package developed for Pathfinder by C. Stoker et al. as a participating science project. By matching features in the left and right camera, an automated machine vision algorithm produced dense range maps of the nearfield, which were projected into a three-dimensional model as a connected polygonal mesh. Distance and angle measurements can be made on features viewed in the model using a mouse-driven three-dimensional cursor and a point-and-click interface. The VR model also incorporates graphical representations of the lander and rover and the sequence and spatial locations at which rover data were taken. As the rover moved, graphical models of the rover were added for each position that could be uniquely determined using stereo images of the rover taken by the IMP. Images taken by the rover were projected into the model as two-dimensional 'billboards' to show the proper perspective of these images.

    NOTE: original caption as published in Science Magazine

    Mars Pathfinder is the second in NASA's Discovery program of low-cost spacecraft with highly focused science goals. The Jet Propulsion Laboratory, Pasadena, CA, developed and manages the Mars Pathfinder mission for NASA's Office of Space Science, Washington, D.C. JPL is a division of the California Institute of Technology (Caltech).

  1. Comparison of Analysis, Simulation, and Measurement of Wire-to-Wire Crosstalk. Part 2

    NASA Technical Reports Server (NTRS)

    Bradley, Arthur T.; Yavoich, Brian James; Hodson, Shane M.; Godley, Franklin

    2010-01-01

    In this investigation, we compare crosstalk analysis, simulation, and measurement results for electrically short configurations. Methods include hand calculations, PSPICE simulations, Microstripes transient field solver, and empirical measurement. In total, four representative physical configurations are examined, including a single wire over a ground plane, a twisted pair over a ground plane, generator plus receptor wires inside a cylindrical conduit, and a single receptor wire inside a cylindrical conduit. Part 1 addresses the first two cases, and Part 2 addresses the final two. Agreement between the analysis methods and test data is shown to be very good.

  2. Comparison of Analysis, Simulation, and Measurement of Wire-to-Wire Crosstalk. Part 1

    NASA Technical Reports Server (NTRS)

    Bradley, Arthur T.; Yavoich, Brian James; Hodson, Shame M.; Godley, Richard Franklin

    2010-01-01

    In this investigation, we compare crosstalk analysis, simulation, and measurement results for electrically short configurations. Methods include hand calculations, PSPICE simulations, Microstripes transient field solver, and empirical measurement. In total, four representative physical configurations are examined, including a single wire over a ground plane, a twisted pair over a ground plane, generator plus receptor wires inside a cylindrical conduit, and a single receptor wire inside a cylindrical conduit. Part 1 addresses the first two cases, and Part 2 addresses the final two. Agreement between the analysis, simulation, and test data is shown to be very good.

  3. Windows: Life after Wire.

    ERIC Educational Resources Information Center

    Razwick, Jerry

    2003-01-01

    Although wired glass is extremely common in school buildings, the International Building Code adopted new standards that eliminate the use of traditional wired glass in K-12 schools, daycare centers, and athletic facilities. Wired glass breaks easily, and the wires can cause significant injuries by forming dangerous snags when the glass breaks.…

  4. 107. OVERHEAD REFRIGERANT PIPING AND ELECTRICAL TERMINALS FOR SYSTEM 2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    107. OVERHEAD REFRIGERANT PIPING AND ELECTRICAL TERMINALS FOR SYSTEM 2 CONTROLS IN MECHANICAL EQUIPMENT ROOM (201), LSB (BLDG. 751) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  5. Interior view of main section of milk barn. Opening overhead ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior view of main section of milk barn. Opening overhead leads to attic crawl space. Camera is pointed SW. - Kosai Farm, Milk Barn, B Street north of Northwest Twenty-ninth Street, Auburn, King County, WA

  6. 114. OVERHEAD CABLE TRAYS AT NORTH SIDE OF MECHANICAL AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    114. OVERHEAD CABLE TRAYS AT NORTH SIDE OF MECHANICAL AND ELECTRICAL ROOM (110), LSB (BLDG. 770) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  7. INTERIOR VIEW, SETTING LARGE CORE WITH ASSISTANCE FROM THE OVERHEAD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR VIEW, SETTING LARGE CORE WITH ASSISTANCE FROM THE OVERHEAD RAIL CRANE IN BOX FLOOR MOLD AREA (WORKERS: DAN T. WELLS AND TRUMAN CARLISLE). - Stockham Pipe & Fittings Company, Ductile Iron Foundry, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  8. Detail, east side, north end, showing door and overhead rail ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail, east side, north end, showing door and overhead rail for refrigeration room. - Fitzsimons General Hospital, Ice Plant, Southwest Corner of East I Avenue & North Thirteenth Street, Aurora, Adams County, CO

  9. INTERIOR VIEW OF THE OVERHEAD GARAGE DOOR. SHOWING THE LARGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR VIEW OF THE OVERHEAD GARAGE DOOR. SHOWING THE LARGE OPENING WITH CAST STONE SILL IN THE EXTERIOR GARAGE WALL AT LEFT. VIEW FACING NORTHWEST. - Hickam Field, Officers' Housing Type F, 602 Beard Avenue, Honolulu, Honolulu County, HI

  10. 161. BLACKSMITH SHOP, OVERHEAD SHAFT. BELT ON LEFT CONNECTS TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    161. BLACKSMITH SHOP, OVERHEAD SHAFT. BELT ON LEFT CONNECTS TO SHAFTS WHICH RUN POWER PRESS AND HYDRAULIC TIRE SETTER. - Gruber Wagon Works, Pennsylvania Route 183 & State Hill Road at Red Bridge Park, Bernville, Berks County, PA

  11. 2. OVERHEAD CHEMICAL PROCESS PIPING BETWEEN BUILDINGS 422, ON RIGHT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. OVERHEAD CHEMICAL PROCESS PIPING BETWEEN BUILDINGS 422, ON RIGHT, AND 431, ON LEFT. - Rocky Mountain Arsenal, Crude Mustard & Aldrin Manufacturing, 1200 feet South of December Seventh Avenue; 600 feet East of D Street, Commerce City, Adams County, CO

  12. Overhead Projector Demonstrations: A Classroom Demonstration of Aliphatic Substitution.

    ERIC Educational Resources Information Center

    Perina, Ivo; Mihanovic, Branka

    1989-01-01

    Presents a halogen substitution of an alkane using a compartmentalized Petri dish or Conway dish on an overhead projector. Provides methodology and several modifications for different reactions. Uses hexane, methyl orange, bromine, and silver nitrate. (MVL)

  13. 13. DETAIL, LATERAL BRACING FOR INTERIOR OVERHEAD CRANE Delaware, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. DETAIL, LATERAL BRACING FOR INTERIOR OVERHEAD CRANE - Delaware, Lackawanna & Western Railroad Freight & Rail Yard, Multiple Unit Light Inspection Shed, New Jersey Transit Hoboken Terminal Rail Yard, Hoboken, Hudson County, NJ

  14. 14. INTERIOR, INSPECTION PITS AND OVERHEAD CATWALKS, FACING WEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INTERIOR, INSPECTION PITS AND OVERHEAD CATWALKS, FACING WEST - Delaware, Lackawanna & Western Railroad Freight & Rail Yard, Multiple Unit Light Inspection Shed, New Jersey Transit Hoboken Terminal Rail Yard, Hoboken, Hudson County, NJ

  15. 17. INTERIOR, INSPECTION PITS, OVERHEAD CRANE SUPPORT AND CAR JACKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. INTERIOR, INSPECTION PITS, OVERHEAD CRANE SUPPORT AND CAR JACKING PADS, FACING EAST - Delaware, Lackawanna & Western Railroad Freight & Rail Yard, Multiple Unit Light Inspection Shed, New Jersey Transit Hoboken Terminal Rail Yard, Hoboken, Hudson County, NJ

  16. 9. SOUTH CABLEWAY TOWER AND OVERHEAD SKIP, SOUTH SIDE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. SOUTH CABLEWAY TOWER AND OVERHEAD SKIP, SOUTH SIDE OF THE COLORADO RIVER ABOVE THE DENVER AND RIO GRANDE RAILROAD TRACKS, VIEW TO THE EAST. - Shoshone Hydroelectric Plant Complex, 60111 U.S. Highway 6, Garfield County, CO

  17. Overhead Projector Demonstrations: Tilted TOPS: Inclined Plane Projection.

    ERIC Educational Resources Information Center

    Alyea, Hubert N.

    1989-01-01

    The construction and uses of a device to facilitate the use of an overhead projector to show chemical reactions is presented. Materials and instructions for construction as well as reactor vessels are discussed. (CW)

  18. New rain shed (Building No. 241), overhead pipeline and raw ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    New rain shed (Building No. 241), overhead pipeline and raw water tank T4. Distribution pump house can be seen at the center of building. - Hawaii Volcanoes National Park Water Collection System, Hawaii Volcanoes National Park, Volcano, Hawaii County, HI

  19. WEST ELEVATION, CAMERA FACING EAST. THE OVERHEAD PIPES ARE FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    WEST ELEVATION, CAMERA FACING EAST. THE OVERHEAD PIPES ARE FOR DISTRIBUTING STEAM FROM THE NEARBY HEATING PLANT TO VARIOUS PARTS OF THE COMPLEX. - New Haven Rail Yard, Oil Storage Building, Vicinity of Union Avenue, New Haven, New Haven County, CT

  20. Universities Review Overhead Charges; Some Alter Policies on President's Home.

    ERIC Educational Resources Information Center

    Cordes, Colleen

    1991-01-01

    Congressional investigations into university overhead charges, especially those at Stanford University (California), for federally sponsored research are leading universities to reexamine and change some policies, including charging some housing costs for university officers to government contracts. (DB)

  1. 27. OVERHEAD TOILET, SHOWER, CHANGE ROOM STRUCTURE. VIEW TO NORTHNORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. OVERHEAD TOILET, SHOWER, CHANGE ROOM STRUCTURE. VIEW TO NORTH-NORTHEAST. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  2. Overhead Transparencies for Viewing Molecular Structure in Three Dimensions.

    ERIC Educational Resources Information Center

    Hale, Edward M.

    1993-01-01

    Explains how a useful stereo image for overhead projection can be easily produced using technology available to most teachers. Red and green transparency films and red/green glasses are used to produce the three-dimensional view. (PR)

  3. Southeast corner with overhead crane in foreground Bureau of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Southeast corner with overhead crane in foreground - Bureau of Mines Boulder City Experimental Station, Titanium Development Plant, Date Street north of U.S. Highway 93, Boulder City, Clark County, NV

  4. 16. THE INSTALLATION OF CONVEYORS AND OVERHEAD RAILS ELIMINATED THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. THE INSTALLATION OF CONVEYORS AND OVERHEAD RAILS ELIMINATED THE NEED TO LAY MOLDS OUT ON FLOORS AND HAND-POUR THEM. INSTEAD, WORKERS PULLED LARGE LADLES ALONG OVERHEAD RAILS AND FILLED CONVEYOR-DRIVEN MOLDS WHILE THEY STOOD ON A MOVING PLATFORM THAT TRAVELED AT THE SAME SPEED AS THE MOLD CONVEYOR, CA. 1950. - Stockham Pipe & Fittings Company, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  5. Stretched Wire Mechanics

    SciTech Connect

    Bowden, Gordon; /SLAC

    2005-09-06

    Stretched wires are beginning to play an important role in the alignment of accelerators and synchrotron light sources. Stretched wires are proposed for the alignment of the 130 meter long LCLS undulator. Wire position technology has reached sub-micron resolution yet analyses of perturbations to wire straightness are hard to find. This paper considers possible deviations of stretched wire from the simple 2-dimensional catenary form.

  6. Computer-based mechanical design of overhead lines

    NASA Astrophysics Data System (ADS)

    Rusinaru, D.; Bratu, C.; Dinu, R. C.; Manescu, L. G.

    2016-02-01

    Beside the performance, the safety level according to the actual standards is a compulsory condition for distribution grids’ operation. Some of the measures leading to improvement of the overhead lines reliability ask for installations’ modernization. The constraints imposed to the new lines components refer to the technical aspects as thermal stress or voltage drop, and look for economic efficiency, too. The mechanical sizing of the overhead lines is after all an optimization problem. More precisely, the task in designing of the overhead line profile is to size poles, cross-arms and stays and locate poles along a line route so that the total costs of the line's structure to be minimized and the technical and safety constraints to be fulfilled.The authors present in this paper an application for the Computer-Based Mechanical Design of the Overhead Lines and the features of the corresponding Visual Basic program, adjusted to the distribution lines. The constraints of the optimization problem are adjusted to the existing weather and loading conditions of Romania. The outputs of the software application for mechanical design of overhead lines are: the list of components chosen for the line: poles, cross-arms, stays; the list of conductor tension and forces for each pole, cross-arm and stay for different weather conditions; the line profile drawings.The main features of the mechanical overhead lines design software are interactivity, local optimization function and high-level user-interface

  7. Overhead in communication systems as the cost of constraints

    NASA Astrophysics Data System (ADS)

    Dunn, Brian P.

    This dissertation develops a perspective for studying overhead in communication systems that contrasts the traditional viewpoint that overhead is the "non-data" portion of transmissions. By viewing overhead as the cost of constraints imposed on a system, information-theoretic techniques can be used to obtain fundamental limits on system performance. In principle, protocol overhead in practical implementations can then be benchmarked against these fundamental limits in order to identify opportunities for improvement. We examine three sources of overhead that have been studied in both information theory and networking using different models and metrics. For multi-access communication systems, we compute constrained capacity regions for two binary additive channels with feedback and develop inner and outer bounds on the capacity region of the packet collision channel with feedback that appear to be tight numerically. We develop bounds on the protocol overhead required to meet an average delay constraint and then use these bounds to characterize rate-delay tradeoffs for communicating a bursty source over a noisy channel. Finally, we study information-theoretic security in timing channels and show that non-zero secrecy rates can be achieved over the wiretap timing channel using a deterministic encoder.

  8. Concealed wire tracing apparatus

    DOEpatents

    Kronberg, James W.

    1994-01-01

    An apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receivers position with respect to the wiring. The receivers audible signal is strongest when the receiver is directly above the wiring and the long axis of the receivers coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring's concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest.

  9. Wire Test Grip Fixture

    NASA Technical Reports Server (NTRS)

    Burke, Christopher S.

    2011-01-01

    Wire-testing issues, such as the gripping strains imposed on the wire, play a critical role in obtaining clean data. In a standard test frame fitted with flat wedge grips, the gripping action alone creates stresses on the wire specimen that cause the wire to fail at the grip location. A new test frame, which is outfitted with a vacuum chamber, negated the use of any conventional commercially available wire test fixtures, as only 7 in. (17.8 cm) existed between the grip faces. An innovative grip fixture was designed to test thin gauge wire for a variety of applications in an existing Instron test frame outfitted with a vacuum chamber.

  10. Performance of gas-insulated substations and associated grounding networks during fault and transient conditions

    SciTech Connect

    Lee, H.; Dawalibi, F.P.; Ruan, W.; Fortin, S.

    1996-11-01

    This paper discusses in detail the electric modeling of the overhead tubular enclosures of a 500 kV circuit breaker in a gas insulated substation. Under both steady-state and phase-to-ground fault conditions, the current distribution on the enclosure as well as the spatial distribution of the scalar potentials and electromagnetic fields near the circuit breaker are computed at different frequencies for various wire-mesh models of the breaker enclosure. The selected frequencies are representative of those present in the frequency spectrum of typical lightning transient currents. The different models of the breaker enclosure are obtained by varying the number of conductors used to represent the enclosure. For a given enclosure diameter and length, the minimum number of conductors required to obtain satisfactory current distribution and electromagnetic field results at different frequencies are determined.

  11. CURRENT CONCEPTS IN SHOULDER EXAMINATION OF THE OVERHEAD ATHLETE

    PubMed Central

    Ellenbecker, Todd

    2013-01-01

    Examination of the shoulder complex has long been described as challenging. This is particularly true in the examination of the overhead athlete who has structural differences when compared to a shoulder patient who is a non‐athlete. Complexity with the examination is due to unique biomechanical and structural changes, multiple joint articulations, multiple pain patterns, and the potential of injury to structures both inside (intra‐articular) and outside (extra‐articular) the glenohumeral joint. Repetitive stresses placed on the shoulders of overhead athletes may affect range of motion, strength, scapular position, and ultimately, the integrity of soft tissue and bony structures in any of the joints that comprise the shoulder complex. Furthermore, many shoulder examination tests thought to be unique to a single structure, joint, or condition can be positive in multiple conditions. The examination of the overhead athletes shoulder, coupled with a thorough medical history will provide a solid foundation to allow a functional physical therapy diagnosis and provide clues as to the presence of the lesion (s) causing disability. The purpose of this clinical commentary is to assist the reader to understand the unique physical characteristics of the overhead athlete, which will lead to a more accurate and reproducible evaluation of athletes who sustain injuries while participating in overhead sports. Level of Evidence: 5 PMID:24175138

  12. Biceps instability and Slap type II tear in overhead athletes.

    PubMed

    Osti, Leonardo; Soldati, Francesco; Cheli, Andrea; Pari, Carlotta; Massari, Leo; Maffulli, Nicola

    2012-10-01

    Type II lesions are common lesions encountered in overhead athletes with controversies arising in term of timing for treatment, surgical approach, rehabilitation and functional results. The aim of our study was to evaluate the outcomes of arthroscopic repair of type II SLAP tears in overhead athletes, focusing on the time elapsed from diagnosis and treatment, time needed to return to sport, rate of return to sport and to previous level of performance, providing an overview concerning evidence for the effectiveness of different surgical approaches to type II SLAP tears in overhead athletes. A internet search on peer reviewed Journal from 1990, first descriprion of this pathology, to 2012, have been conducted evaluating the outcomes for both isolated Slap II tear overhead athletes and those who presented associated lesions treated. The results have been analyzed according to the scale reported focusing on return to sport and level of activity. Apart from a single study, non prospective level I and II studies were detected. Return to play at the same level ranged form 22% to 94% with different range of technique utilized with the majority of the authors recommending the fixation of these lesions but biceps tenodesis can lead to higher satisfaction racte when directly compated to the anchor fixation. Associated pathologies such as partial or full tickness rotator cuff tear did not clearly affect the outcomes and complications rate. There is no consensus regarding timing and treatment for type II SLAP, especially in overhead athletes who need to regain a high level of performance. PMID:23738307

  13. Report on Analyses of WAC Samples of Evaporator Overheads - 2004

    SciTech Connect

    Oji, L

    2005-03-18

    In November and December of 2004, the Tank Farm submitted annual samples from 2F, 2H and 3H Evaporator Overhead streams for characterization to verify compliance with the new Effluent Treatment Facility (ETF) Waste Acceptance Criteria (WAC) and to look for organic species. With the exception of slightly high ammonia in the 2F evaporator overheads and high radiation control guide number for the 3H and 2F evaporator overhead samples, all the overheads samples were found to be in compliance with the Effluent Treatment Facility WAC. The ammonium concentration in the 2F-evaporator overhead, at 33 mg/L, was above the ETF waste water collection tank (WWCT) limits of 28 mg/L. The RCG Number for the 3H and 2F evaporator samples at, respectively, 1.38E-02 and 8.24E-03 were higher than the WWCT limit of 7.69E-03. The analytical detection limits for americium-241 and radium-226 in the evaporator samples were not consistently met because of low WWCT detection limits and insufficient evaporator samples.

  14. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1998-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: 3.7 amps per wire, bundle of 15 or more wires, 70 C environment, and vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  15. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1998-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: (1) 3.7 amps per wire; (2) bundle of 15 or more wires; (3) 70 C environment: and (4) vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  16. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1999-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 degree C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: (1) 3.7 amps per wire (2) bundle of 15 or more wires (3) 70 C environment (4) vacuum of 10(exp -5) torr or less To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  17. Ulnar collateral ligament in the overhead athlete: a current review.

    PubMed

    Dugas, Jeffrey; Chronister, Justin; Cain, E Lyle; Andrews, James R

    2014-09-01

    Ulnar collateral ligament (UCL) injuries are most commonly reported in baseball players (particularly in pitchers) but have also been observed in other overhead athletes including javelin, softball, tennis, volleyball, water polo, and gymnastics. Partial injuries have been successfully treated with appropriate nonoperative measures but complete tears and chronic injuries have shown less benefit from conservative measures. In these cases, surgical reconstruction has become the treatment modality for overhead athlete who wishes to continue to play. This article discusses the functional anatomy and biomechanics of the UCL as related to the pathophysiology of overhead throwing, as well as the important clinical methods needed to make accurate and timely diagnosis. It also gives an updated review of the current clinical outcomes and complications of surgical reconstruction. PMID:25077747

  18. Laser Wire Stripper

    NASA Technical Reports Server (NTRS)

    1983-01-01

    NASA-developed space shuttle technology is used in a laser wire stripper designed by Raytheon Company. Laser beams cut through insulation on a wire without damaging conductive metal, because laser radiation that melts plastic insulation is reflected by the metal. The laser process is fast, clean, precise and repeatable. It eliminates quality control problems and the expense of rejected wiring.

  19. 86. SITE INSTRUMENTATION: VIEW OF COMMUNICATIONS WIRING APPROXIMATELY THREE MILES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    86. SITE INSTRUMENTATION: VIEW OF COMMUNICATIONS WIRING APPROXIMATELY THREE MILES NORTH OF GROUND ZERO, LOOKING NORTH - White Sands Missile Range, Trinity Site, Vicinity of Routes 13 & 20, White Sands, Dona Ana County, NM

  20. 30 CFR 75.516 - Power wires; support.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-voltage power to underground rectifying equipment or transformers, or bare or insulated ground and return wires) shall be supported on well-insulated insulators and shall not contact combustible material,...

  1. 30 CFR 75.516 - Power wires; support.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-voltage power to underground rectifying equipment or transformers, or bare or insulated ground and return wires) shall be supported on well-insulated insulators and shall not contact combustible material,...

  2. 30 CFR 75.516 - Power wires; support.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-voltage power to underground rectifying equipment or transformers, or bare or insulated ground and return wires) shall be supported on well-insulated insulators and shall not contact combustible material,...

  3. 30 CFR 75.516 - Power wires; support.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-voltage power to underground rectifying equipment or transformers, or bare or insulated ground and return wires) shall be supported on well-insulated insulators and shall not contact combustible material,...

  4. 19. Interior view showing flight simulator partition and rear overhead ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Interior view showing flight simulator partition and rear overhead door, dock no. 493. View to south. - Offutt Air Force Base, Looking Glass Airborne Command Post, Nose Docks, On either side of Hangar Access Apron at Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  5. MOBILE LADLES, ATTACHED TO OVERHEAD RAILS, ARE FILLED AT EITHER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MOBILE LADLES, ATTACHED TO OVERHEAD RAILS, ARE FILLED AT EITHER THE MALLEABLE FOUNDRY BULL LADLE OR ELECTRIC FURNACE BEFORE THEY TRANSPORT MOLTEN IRON TO MOLDS PREPARED BY DISAMATIC MOLDMAKING MACHINE OR ON ONE OF THE CONVEYORS. - Stockham Pipe & Fittings Company, Malleable Foundry, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  6. 18. PRIOR TO THE USE OF CONVEYORS AND OVERHEAD RAILS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. PRIOR TO THE USE OF CONVEYORS AND OVERHEAD RAILS, MOLDERS, USUALLY AFRICAN-AMERICAN, HAD TO INDIVIDUALLY HAND FILL MOLDS LAID OUT ON THE FLOOR, SUCH AS THESE IN THE MALLEABLE FOUNDRY IN 1923. - Stockham Pipe & Fittings Company, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  7. 30 CFR 56.16010 - Dropping materials from overhead.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 56.16010 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Materials Storage and Handling § 56.16010 Dropping materials from overhead. To protect personnel, material shall...

  8. 30 CFR 56.16010 - Dropping materials from overhead.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Section 56.16010 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Materials Storage and Handling § 56.16010 Dropping materials from overhead. To protect personnel, material shall...

  9. 30 CFR 56.16010 - Dropping materials from overhead.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 56.16010 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Materials Storage and Handling § 56.16010 Dropping materials from overhead. To protect personnel, material shall...

  10. 30 CFR 56.16010 - Dropping materials from overhead.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 56.16010 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Materials Storage and Handling § 56.16010 Dropping materials from overhead. To protect personnel, material shall...

  11. 30 CFR 57.16010 - Dropping materials from overhead.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 57.16010 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Materials Storage and Handling § 57.16010 Dropping materials from overhead. To protect personnel, material shall...

  12. 30 CFR 57.16010 - Dropping materials from overhead.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 57.16010 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Materials Storage and Handling § 57.16010 Dropping materials from overhead. To protect personnel, material shall...

  13. 30 CFR 57.16010 - Dropping materials from overhead.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 57.16010 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Materials Storage and Handling § 57.16010 Dropping materials from overhead. To protect personnel, material shall...

  14. 30 CFR 56.16010 - Dropping materials from overhead.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 56.16010 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Materials Storage and Handling § 56.16010 Dropping materials from overhead. To protect personnel, material shall...

  15. 30 CFR 57.16010 - Dropping materials from overhead.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 57.16010 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Materials Storage and Handling § 57.16010 Dropping materials from overhead. To protect personnel, material shall...

  16. 30 CFR 57.16010 - Dropping materials from overhead.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Section 57.16010 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Materials Storage and Handling § 57.16010 Dropping materials from overhead. To protect personnel, material shall...

  17. Communication overhead on the Intel iPSC-860 hypercube

    NASA Technical Reports Server (NTRS)

    Bokhari, Shahid H.

    1990-01-01

    Experiments were conducted on the Intel iPSC-860 hypercube in order to evaluate the overhead of interprocessor communication. It is demonstrated that: (1) contrary to popular belief, the distance between two communicating processors has a significant impact on communication time, (2) edge contention can increase communication time by a factor of more than 7, and (3) node contention has no measurable impact.

  18. Dissolving Carboxylic Acids and Primary Amines on the Overhead Projector

    ERIC Educational Resources Information Center

    Solomon, Sally D.; Rutkowsky, Susan A.

    2010-01-01

    Liquid carboxylic acids (or primary amines) with limited solubility in water are dissolved by addition of aqueous sodium hydroxide (or hydrochloric acid) on the stage of an overhead projector using simple glassware and very small quantities of chemicals. This effective and colorful demonstration can be used to accompany discussions of the…

  19. 52. SOUTH PLANT PROCESS PIPING OVERHEAD RACK, WITH SHELL OIL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. SOUTH PLANT PROCESS PIPING OVERHEAD RACK, WITH SHELL OIL COMPANY FACILITIES IN BACKGROUND. VIEW TO SOUTHEAST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  20. 50. SOUTH PLANT PROCESS PIPING OVERHEAD RACK OVER SOUTHCENTER RAILROAD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. SOUTH PLANT PROCESS PIPING OVERHEAD RACK OVER SOUTH-CENTER RAILROAD SPUR. VIEW TO NORTHWEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  1. 45. SOUTH PLANT NORTHCENTER RAILROAD SPUR, WITH PROCESS PIPING OVERHEAD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. SOUTH PLANT NORTH-CENTER RAILROAD SPUR, WITH PROCESS PIPING OVERHEAD RACK. VIEW TO WEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  2. Conversion of Bench Demonstration Using the Overhead Projector.

    ERIC Educational Resources Information Center

    Johnstone, A. H.; Al-Shuaili, Ali

    2001-01-01

    Presents a new technique for projecting science demonstrations, enabling a larger number of students to see the demonstration without scaling up the experiment. Describes innovative attachments that magnify projector images using mirrors, solutions to the problem of convergent test tubes, development of overhead projection experiments, necessary…

  3. 23 CFR 140.907 - Overhead and indirect construction costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the railroad; (3) The costs are eligible in accordance with the Federal Acquisition Regulation (48 CFR... REIMBURSEMENT Reimbursement for Railroad Work § 140.907 Overhead and indirect construction costs. (a) A State... work orders and other functions on an equitable and uniform basis in accordance with generally...

  4. View east from western edge of complex. Collapsed overhead conveyor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View east from western edge of complex. Collapsed overhead conveyor in foreground carried ganister down to the brickyard from crushing and grinding facility on the mountain. - Harbison-Walker Refractories Company, West end of Shirley Street, Mount Union, Huntingdon County, PA

  5. 29 CFR 1910.179 - Overhead and gantry cranes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operator in a cab located on the bridge or trolley. (4) Cantilever gantry crane means a gantry or... more legs. It may have one or more fixed or hinged cantilever ends. (14) Wall crane means a crane.... This section applies to overhead and gantry cranes, including semigantry, cantilever gantry,...

  6. 29 CFR 1910.179 - Overhead and gantry cranes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operator in a cab located on the bridge or trolley. (4) Cantilever gantry crane means a gantry or... more legs. It may have one or more fixed or hinged cantilever ends. (14) Wall crane means a crane.... This section applies to overhead and gantry cranes, including semigantry, cantilever gantry,...

  7. 29 CFR 1910.179 - Overhead and gantry cranes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operator in a cab located on the bridge or trolley. (4) Cantilever gantry crane means a gantry or... more legs. It may have one or more fixed or hinged cantilever ends. (14) Wall crane means a crane.... This section applies to overhead and gantry cranes, including semigantry, cantilever gantry,...

  8. 29 CFR 1910.179 - Overhead and gantry cranes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operator in a cab located on the bridge or trolley. (4) Cantilever gantry crane means a gantry or... more legs. It may have one or more fixed or hinged cantilever ends. (14) Wall crane means a crane.... This section applies to overhead and gantry cranes, including semigantry, cantilever gantry,...

  9. Overhead Projector Spectrum of Polymethine Dye: A Physical Chemistry Demonstration.

    ERIC Educational Resources Information Center

    Solomon, Sally; Hur, Chinhyu

    1995-01-01

    Encourages the incorporation into lecture of live experiments that can be predicted or interpreted with abstract models. A demonstration is described where the position of the predominant peak of 1,1'-diethyl-4,4'-cyanine iodide is measured in class using an overhead projector spectrometer, then predicted using the model of a particle in a…

  10. View, from south showing verticals, diagonals, and overhead bracing of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View, from south showing verticals, diagonals, and overhead bracing of south span Pratt through trusses, south portal of north span, pipe rails and posts, and concrete deck with bituminous wearing surface - Castle Garden Bridge, Township Route 343 over Bennetts Branch of Sinnemahoning Creek, Driftwood, Cameron County, PA

  11. Phase Sensitive Cueing for 3D Objects in Overhead Images

    SciTech Connect

    Paglieroni, D

    2005-02-04

    Locating specific 3D objects in overhead images is an important problem in many remote sensing applications. 3D objects may contain either one connected component or multiple disconnected components. Solutions must accommodate images acquired with diverse sensors at various times of the day, in various seasons of the year, or under various weather conditions. Moreover, the physical manifestation of a 3D object with fixed physical dimensions in an overhead image is highly dependent on object physical dimensions, object position/orientation, image spatial resolution, and imaging geometry (e.g., obliqueness). This paper describes a two-stage computer-assisted approach for locating 3D objects in overhead images. In the matching stage, the computer matches models of 3D objects to overhead images. The strongest degree of match over all object orientations is computed at each pixel. Unambiguous local maxima in the degree of match as a function of pixel location are then found. In the cueing stage, the computer sorts image thumbnails in descending order of figure-of-merit and presents them to human analysts for visual inspection and interpretation. The figure-of-merit associated with an image thumbnail is computed from the degrees of match to a 3D object model associated with unambiguous local maxima that lie within the thumbnail. This form of computer assistance is invaluable when most of the relevant thumbnails are highly ranked, and the amount of inspection time needed is much less for the highly ranked thumbnails than for images as a whole.

  12. Oblique view to the northwest detailing four overhead rolling doors ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Oblique view to the northwest detailing four overhead rolling doors on the northeast elevation - Over-the-Horizon Backscatter Radar Network, Mountain Home Air Force Operations Building, On Desert Street at 9th Avenue Mountain Home Air Force Base, Mountain Home, Elmore County, ID

  13. GRINDING ROOM, LOOKING EAST. NOTE OVERHEAD BRIDGE CRANE RIDING ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GRINDING ROOM, LOOKING EAST. NOTE OVERHEAD BRIDGE CRANE RIDING ON STEEL RAILS SUPPORTED BY WOODEN BEAMS AND CYCLONE CLASSIFIER IN CENTER. AT RIGHT IS TOP PORTION OF FLASH FLOTATION CELL. - Shenandoah-Dives Mill, 135 County Road 2, Silverton, San Juan County, CO

  14. The Overhead Projector and the Teacher of English in Brazil.

    ERIC Educational Resources Information Center

    Funck, Elvio Antonio

    This paper presents arguments for the consistent use of modern audiovisual aids in English classes, not as a complementary device, but as a fundamental aid. The intention of the thesis is to: (1) show that the overhead projector can be used to help students develop the four language skills; and (2) encourage English teachers, particularly in…

  15. 78 FR 77027 - Overhead Clearance (Air-Draft) Accidents

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ... Federal Register (73 FR 3316). Description of Petition for Rulemaking In its Petition for Rulemaking dated... meeting notice (78 FR 49543, 49544, August 14, 2013) and copy of Task 13-10, Recommendation to Establish... SECURITY Coast Guard 33 CFR Parts 117, 161, and 164 46 CFR Part 4 Overhead Clearance (Air-Draft)...

  16. The Overhead System: Production, Implementation and Utilization. 2nd Edition.

    ERIC Educational Resources Information Center

    Smith, Richard E.; Pearson, Jerry D.

    This handbook is designed to help three groups: the administrator who does not have the services of a media specialist, the media specialist who wishes to expand his knowledge or skills, and the classroom teacher who recognizes the value of the overhead as a teaching tool and is looking for practical assistance. Guidelines are provided in 11…

  17. DEVELOPMENT AND EVALUATION OF A NEW DEVICE FOR OVERHEAD DRILLING

    PubMed Central

    Rempel, David M.; Star, Demetra; Gibbons, Billy; Barr, Alan; Janowitz, Ira

    2008-01-01

    Drilling overhead into concrete is a strenuous task that is associated with shoulder, arm, neck and back musculoskeletal disorders due to the forceful and awkward aspects of the work. This common task is done to hang pipes, ducts and trays and is performed by construction workers in the electrical, pipe fitting, sheet metal, ironwork and carpentry trades. In this project, alternative devices for overhead drilling were developed in order to reduce the high shoulder loads. The design premise for the alternative devices was adopted from interventions developed on construction sites. These devices were evaluated for usability, productivity, and fatigue in two rounds of testing by 30 construction workers performing their usual overhead drilling. After each round of testing the device designs were modified based on feedback. The final design was associated with much less arm fatigue but similar productivity compared to the usual method for overhead drilling. The feedback, design suggestions and field testing by experienced construction workers was vital to the successful development of these devices. Field testing were done with real tasks, in diverse field settings, with subjects familiar with the task. Multiple rounds of field testing and redesign can significantly improve the safety and usability of new tools. Having experienced workers accessing the new tools can help with determining if and how a new tool is compatible and beneficial to current work practices. PMID:19079737

  18. Overhead Projector Demonstrations: Some Ideas from the Past.

    ERIC Educational Resources Information Center

    Kolb, Doris

    1987-01-01

    Describes nine chemistry demonstrations that can be done using an overhead projector. Includes demonstrations on common ion effect, crystal formation from supersaturated solutions, making iron positive with nitric acid, optical activity, carbon dioxide in human breath, amphoteric hydroxides, the surface tension of mercury, and natural acid-base…

  19. Launcher and Transparent Air Table for Use with Overhead Projector

    ERIC Educational Resources Information Center

    Carr, H. Y.; and others

    1969-01-01

    Describes an apparatus designed for quantitative demonstrations of collision experiments. The apparatus consists of a transparent air table and a launching device for projecting two objects simultaneously. It may be used with an overhead projector. The apparatus won third prize in Demonstration Lecture Apparatus in the A.A.P.T. Apparatus…

  20. 12. OVERHEAD VIEW OF THE EVISCERATION AREA; LOOKING NORTH FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. OVERHEAD VIEW OF THE EVISCERATION AREA; LOOKING NORTH FROM THE VISITORS' GALLERY; NOTE THE RAISED CONCRETE PLATFORMS FOR WORKERS; VISCERA TABLE HAS BEEN REMOVED - Rath Packing Company, Beef Killing Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  1. 13. Emplacement no. 2, overhead view of counterweight well, showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Emplacement no. 2, overhead view of counterweight well, showing channel for gun motor cable and bolt plates upon which base ring of gun carriage was mounted - Fort Wadsworth Battery Romeyn B. Ayers, South side of Ayers Road, Staten Island, Rosebank, Richmond County, NY

  2. STOCK YARD LOOKING SOUTHEAST SHOWING OVERHEAD YARD CRANE RAIL, THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    STOCK YARD LOOKING SOUTHEAST SHOWING OVERHEAD YARD CRANE RAIL, THE MALLEABLE CUPOLAS AND EMISSION RECOVERY SYSTEM, OLD SHED ROOF THAT COVERED THE EARLIER MALLEABLE CUPOLA CHARGING CRANE, MALLEABLE FOUNDRY, AND POLLUTION CONTROL BAGHOUSE. - Stockham Pipe & Fittings Company, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  3. SUMMARY OF THE WESTERN ENERGY OVERHEAD MONITORING PROJECT

    EPA Science Inventory

    The Environmental Protection Agency and the National Aeronautics and Space Administration entered into a five-year overhead monitoring project in June, 1975. The purpose of this joint project was to transfer, from NASA to EPA, hardware and software technology for processing remot...

  4. DETAIL OVERHEAD VIEW OF SECONDARY ORE BIN, CONVEYOR PLATFORM TRAM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL OVERHEAD VIEW OF SECONDARY ORE BIN, CONVEYOR PLATFORM TRAM TRESTLE, AND LOADING PLATFORM, LOOKING SOUTHWEST. THE HOLE IN THE ORE BIN FLOOR CAN BE SEEN, AND BALL MILL FOUNDATION AT LOWER LEFT CORNER. SEE CA-291-13 FOR IDENTICAL B&W NEGATIVE. - Keane Wonder Mine, Park Route 4 (Daylight Pass Cutoff), Death Valley Junction, Inyo County, CA

  5. 5. Overhead trackandpulley system used to haul materials stored in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Overhead track-and-pulley system used to haul materials stored in stock bins under Jones Street to the Tender Frame Shop. - Central of Georgia Railway, Savannah Repair Shops & Terminal Facilities, Tender Frame Shop, Bounded by West Broad, Jones, West Boundary & Hull Streets, Savannah, Chatham County, GA

  6. Overhead throwing injuries of the shoulder and elbow.

    PubMed

    Anderson, Mark W; Alford, Bennett A

    2010-11-01

    Injuries to the shoulder and elbow are common in athletes involved in sporting activities that require overhead motion of the arm. An understanding of the forces involved in the throwing motion, the anatomic structures most at risk, and the magnetic resonance imaging appearances of the most common associated injuries can help to improve diagnostic accuracy when interpreting imaging studies in these patients. PMID:21094403

  7. 5. OVERHEAD VIEW OF GENE CAMP LOOKING SOUTH. GENE PUMP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. OVERHEAD VIEW OF GENE CAMP LOOKING SOUTH. GENE PUMP PLANT IS AT CENTER WITH ADMINISTRATIVE COMPLEX IN FOREGROUND AND RESIDENTIAL AREA BEYOND PLANT. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA

  8. Prevalence of Scapular Dyskinesis in Overhead and Nonoverhead Athletes

    PubMed Central

    Burn, Matthew B.; McCulloch, Patrick C.; Lintner, David M.; Liberman, Shari R.; Harris, Joshua D.

    2016-01-01

    Background: Scapular dyskinesis, or abnormal dynamic scapular control, is a condition that is commonly associated with shoulder pathology but is also present in asymptomatic individuals. Literature varies on whether it represents a cause or symptom of shoulder pathology, but it is believed to be a risk factor for further injury. Clinical identification focuses on visual observation and examination maneuvers. Treatment of altered scapular motion has been shown to improve shoulder symptoms. It is thought to be more common in overhead athletes due to their reliance on unilateral upper extremity function but the incidence within nonoverhead athletes is unknown. Hypothesis: Overhead athletes will have a greater prevalence of scapular dyskinesis when compared with nonoverhead athletes. Study Design: Systematic review; Level of evidence, 3. Methods: After PROSPERO registration, a systematic review was performed using PRISMA guidelines through the PubMed database looking for studies published before October 2014. All studies containing the search terms scapular, scapulothoracic, dyskinesis, dyskinesia, shoulder athlete, or overhead athlete were included. Studies that did not include prevalence data for scapular dyskinesis were excluded. Study methodological quality was evaluated using the modified Coleman methodology score. Descriptive statistics and 2-proportion 2-tailed z-tests were used to compare the reported prevalence of scapular dyskinesis between overhead and nonoverhead athletes. Results: Twelve studies were analyzed including 1401 athletes (1257 overhead and 144 nonoverhead; mean age, 24.4 ± 7.1 years; 78% men). All the studies were evidence level 2 (33%) or level 3 (67%). The reported prevalence of scapular dyskinesis was significantly (P < .0001) higher in overhead athletes (61%) compared with nonoverhead athletes (33%). Conclusion: Scapular dyskinesis was found to have a greater reported prevalence (61%) in overhead athletes compared with nonoverhead athletes

  9. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  10. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires...

  11. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires...

  12. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  13. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  14. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires...

  15. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires...

  16. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  17. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  18. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires...

  19. Thin wire pointing method

    NASA Technical Reports Server (NTRS)

    Green, G.; Mattauch, R. J. (Inventor)

    1983-01-01

    A method is described for forming sharp tips on thin wires, in particular phosphor bronze wires of diameters such as one-thousandth inch used to contact micron size Schottky barrier diodes, which enables close control of tip shape and which avoids the use of highly toxic solutions. The method includes dipping an end of a phosphor bronze wire into a dilute solution of sulfamic acid and applying a current through the wire to electrochemically etch it. The humidity in the room is controlled to a level of less than 50%, and the voltage applied between the wire and another electrode in the solutions is a half wave rectified voltage. The current through the wire is monitored, and the process is stopped when the current falls to a predetermined low level.

  20. Sintered wire annode

    DOEpatents

    Falce, Louis R.; Ives, R. Lawrence

    2007-12-25

    A plurality of high atomic number wires are sintered together to form a porous rod that is parted into porous disks which will be used as x-ray targets. A thermally conductive material is introduced into the pores of the rod, and when a stream of electrons impinges on the sintered wire target and generates x-rays, the heat generated by the impinging x-rays is removed by the thermally conductive material interspersed in the pores of the wires.

  1. Zinc wired rebar

    SciTech Connect

    Zhang, X.G.; Hwang, J.

    1997-02-01

    A novel method for corrosion protection of rebar in concrete is reported wherein it is galvanically protected by attaching a zinc wire along its length. The self-corrosion and galvanic-corrosion loss of the zinc wire is dependent on the water/cement ratio, the size of the cathode, and the concrete cover thickness. The wire acts as a sacrificial anode when the rebar embedded in concrete is exposed to corrosive environments.

  2. Concealed wire tracing apparatus

    DOEpatents

    Kronberg, J.W.

    1994-05-31

    An apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface is disclosed. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receivers position with respect to the wiring. The receivers audible signal is strongest when the receiver is directly above the wiring and the long axis of the receivers coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring's concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest. 4 figs.

  3. Weld Wire Investigation Summary

    SciTech Connect

    Cunningham, M.A.

    1999-03-22

    After GTA welding reservoir A production/process prove-in assemblies, X-ray examination detected a lack of sidewall fusion. After examining several possible causes, it was determined that the weld wire filler metal was responsible, particularly the wire cleaning process. The final conclusion was that the filler wire must be abrasively cleaned in a particular manner to perform as required. The abrasive process was incorporated into the wire material specification, ensuring consistency for all reservoir GTA welding at AlliedSignal Federal Manufacturing and Technologies (FM and T).

  4. Wire-inhomogeneity detector

    DOEpatents

    Gibson, G.H.; Smits, R.G.; Eberhard, P.H.

    1982-08-31

    A device for uncovering imperfections in electrical conducting wire, particularly superconducting wire, by detecting variations in eddy currents. Eddy currents effect the magnetic field in a gap of an inductor, contained in a modified commercial ferrite core, through which the wire being tested is passed. A small increase or decrease in the amount of conductive material, such as copper, in a fixed cross section of wire will unbalance a bridge used to measure the impedance of the inductor, tripping a detector and sounding an alarm.

  5. Mechanism of wire breaking due to sparks in proportional or drift chambers

    NASA Astrophysics Data System (ADS)

    Roderburg, E.; Walsh, S.

    1993-09-01

    The mechanism of wire breaking due to sparks is examined by a setup allowing for a fast change of mechanical wire tension and for optical and electronical registration of sparks. It is shown, that it is possible to choose a wire tension dependant on the capacitance (between the high voltage and ground) so that the wire will not be damaged by sparks. The effect of sparks to wires are compared between tungsten and steel wires and between two chamber gases (argon-methane and pure isobutane).

  6. 1998 wire development workshop proceedings

    SciTech Connect

    1998-04-01

    This report consists of vugraphs of the presentations at the conference. The conference was divided into the following sessions: (1) First Generation Wire Development: Status and Issues; (2) First Generation Wire in Pre-Commercial Prototypes; (3) Second Generation Wire Development: Private Sector Progress and Issues; (4) Second Generation Wire Development: Federal Laboratories; and (5) Fundamental Research Issues for HTS Wire Development.

  7. VIEW SOUTHEASTBUILDING 4 NO. 1 WIRE MILL (1871) WIRE DRAWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW SOUTHEAST-BUILDING 4 NO. 1 WIRE MILL (1871) WIRE DRAWING MACHINE - John A. Roebling's Sons Company & American Steel & Wire Company, South Broad, Clark, Elmer, Mott & Hudson Streets, Trenton, Mercer County, NJ

  8. Wire Array Photovoltaics

    NASA Astrophysics Data System (ADS)

    Turner-Evans, Dan

    Over the past five years, the cost of solar panels has dropped drastically and, in concert, the number of installed modules has risen exponentially. However, solar electricity is still more than twice as expensive as electricity from a natural gas plant. Fortunately, wire array solar cells have emerged as a promising technology for further lowering the cost of solar. Si wire array solar cells are formed with a unique, low cost growth method and use 100 times less material than conventional Si cells. The wires can be embedded in a transparent, flexible polymer to create a free-standing array that can be rolled up for easy installation in a variety of form factors. Furthermore, by incorporating multijunctions into the wire morphology, higher efficiencies can be achieved while taking advantage of the unique defect relaxation pathways afforded by the 3D wire geometry. The work in this thesis shepherded Si wires from undoped arrays to flexible, functional large area devices and laid the groundwork for multijunction wire array cells. Fabrication techniques were developed to turn intrinsic Si wires into full p-n junctions and the wires were passivated with a-Si:H and a-SiNx:H. Single wire devices yielded open circuit voltages of 600 mV and efficiencies of 9%. The arrays were then embedded in a polymer and contacted with a transparent, flexible, Ni nanoparticle and Ag nanowire top contact. The contact connected >99% of the wires in parallel and yielded flexible, substrate free solar cells featuring hundreds of thousands of wires. Building on the success of the Si wire arrays, GaP was epitaxially grown on the material to create heterostructures for photoelectrochemistry. These cells were limited by low absorption in the GaP due to its indirect bandgap, and poor current collection due to a diffusion length of only 80 nm. However, GaAsP on SiGe offers a superior combination of materials, and wire architectures based on these semiconductors were investigated for multijunction

  9. MICROINSTABILITY OF THE SHOULDER IN THE OVERHEAD ATHLETE

    PubMed Central

    Curtis, Alan S.

    2013-01-01

    The overhead throwing athlete is an extremely challenging patient in sports medicine. The repetitive microtraumatic stresses and extreme ranges of motion observed within the athlete’s shoulder joint complex during the throwing motion constantly place the athlete at risk for injury. While gross instability of the shoulder is possible, microinstability is seen far more frequently and is associated with a variety of different pathologies, including rotator cuff tendonitis, internal impingement, and labral lesions. Treatment of the overhead athlete requires the understanding of several principles based on the unique physical characteristics of this type of athlete and the demands placed upon the static stabilizing structures during the act of throwing. The purpose of this paper is to describe these principles and incorporate them into in a multi‐phase progressive rehabilitation program designed to prevent injuries and rehabilitate the injured athlete, both non‐operatively and postoperatively. PMID:24175140

  10. Reducing the overhead for quantum computation when noise is biased

    NASA Astrophysics Data System (ADS)

    Webster, Paul; Bartlett, Stephen D.; Poulin, David

    2015-12-01

    We analyze a model for fault-tolerant quantum computation with low overhead suitable for situations where the noise is biased. The basis for this scheme is a gadget for the fault-tolerant preparation of magic states that enable universal fault-tolerant quantum computation using only Clifford gates that preserve the noise bias. We analyze the distillation of |T > -type magic states using this gadget at the physical level, followed by concatenation with the 15-qubit quantum Reed-Muller code, and comparing our results with standard constructions. In the regime where the noise bias (rate of Pauli Z errors relative to other single-qubit errors) is greater than a factor of 10, our scheme has lower overhead across a broad range of relevant noise rates.

  11. Electromyographic analysis of an ergonomic risk factor: overhead work.

    PubMed

    Kinali, Gulsah; Kara, Sadık; Yıldırım, Mustafa Selman

    2016-06-01

    [Purpose] Repetitive upper extremity exercises result in overuse injuries. However, it is challenging to identify the specific causative movements. This study evaluated the effects of different shoulder positions on grip and electrophysiological activity of upper extremity muscles. [Subjects and Methods] Forty subjects ranging from 18 and 30 years of age were analyzed. Surface electromyography and hand grip strength were measured during a range of shoulder exercises and numerous signal processing methods were applied. [Results] The maximum electromyographic activity intensity was observed in the wrist extensors at various angles. Deltoid activity rose significantly during shoulder flexion. [Conclusion] Overhead work causes shoulder muscle fatigue and prevents effective hand function, which affects occupational health and efficiency. Overhead work involves a hazardous position and decreases efficiency. Ergonomic solutions should be developed to prevent muscle fatigue and decreased grip force. PMID:27390448

  12. CLOMP: Accurately Characterizing OpenMP Application Overheads

    SciTech Connect

    Bronevetsky, G; Gyllenhaal, J; de Supinski, B

    2008-02-11

    Despite its ease of use, OpenMP has failed to gain widespread use on large scale systems, largely due to its failure to deliver sufficient performance. Our experience indicates that the cost of initiating OpenMP regions is simply too high for the desired OpenMP usage scenario of many applications. In this paper, we introduce CLOMP, a new benchmark to characterize this aspect of OpenMP implementations accurately. CLOMP complements the existing EPCC benchmark suite to provide simple, easy to understand measurements of OpenMP overheads in the context of application usage scenarios. Our results for several OpenMP implementations demonstrate that CLOMP identifies the amount of work required to compensate for the overheads observed with EPCC. Further, we show that CLOMP also captures limitations for OpenMP parallelization on NUMA systems.

  13. Electromyographic analysis of an ergonomic risk factor: overhead work

    PubMed Central

    Kinali, Gulsah; Kara, Sadık; Yıldırım, Mustafa Selman

    2016-01-01

    [Purpose] Repetitive upper extremity exercises result in overuse injuries. However, it is challenging to identify the specific causative movements. This study evaluated the effects of different shoulder positions on grip and electrophysiological activity of upper extremity muscles. [Subjects and Methods] Forty subjects ranging from 18 and 30 years of age were analyzed. Surface electromyography and hand grip strength were measured during a range of shoulder exercises and numerous signal processing methods were applied. [Results] The maximum electromyographic activity intensity was observed in the wrist extensors at various angles. Deltoid activity rose significantly during shoulder flexion. [Conclusion] Overhead work causes shoulder muscle fatigue and prevents effective hand function, which affects occupational health and efficiency. Overhead work involves a hazardous position and decreases efficiency. Ergonomic solutions should be developed to prevent muscle fatigue and decreased grip force. PMID:27390448

  14. 4. Overhead view showing the 1927 bridge (narrow bridgeleft side) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Overhead view showing the 1927 bridge (narrow bridge-left side) and 1959 bridge (right side) across Carquinez Strait. Town of Crockett is on south bank (bottom of image). C&H sugar factory is along the strait to the east (right) side of the 1959 bridge. The toll plaza is at the top of the image on the 1959 bridge side. - Carquinez Bridge, Spanning Carquinez Strait at Interstate 80, Vallejo, Solano County, CA

  15. Four steps solve crude-tower overhead corrosion problems

    SciTech Connect

    Lieberman, N.P. )

    1993-07-05

    Hydrochloric acid attack is one of the oldest and best-understood refinery process problems. This would lead one to think that preventing localized hydrochloric acid attack would also be well-understood. Experience, however, indicates that this is far from true. The problem originates with the presence of salt water in crude oils. Most of the salt content of the brine dispersed in crudes is in the form of sodium chloride (NaCl). About 10% of the salt, however, is present as magnesium chloride (MgCl[sub 2]) and calcium chloride (CaCl[sub 2]). In the presence of water and heat, these chloride salts hydrolyze to form HCI. The two-stage overhead system using the hot and cold drum is a design that, despite its widespread use, does not fulfill its objective of stopping crude-tower overhead corrosion. The following program is, in the opinion of the author, the only way to halt overhead corrosion in a crude tower: effective desalting that removes more than 60% of the MgCl[sub 2]; caustic injection down-stream of the desalter to control chlorides in the reflux-drum water draw-off boot; forced water condensation in the crude-tower overhead vapors; and sufficient addition of neutralizing amine to control water boot at a pH of about 6. Finally, there can never be a truly effective replacement for proper desalting. Process Improvement Engineering's experience has repeatedly proven that desalting is the most cost-effective method of controlling hydroscopic hydrochloric acid corrosion. When downstream resid-hydrotreating processes preclude the use of neutralizing caustic, the importance of the desalter is magnified even further.

  16. An estimation of lightning insulation level of overhead distribution lines

    SciTech Connect

    Jacob, P.B.; Grzybowski, S. . Dept. of Electrical Engineering); Ross, E.R. )

    1991-01-01

    This paper develops a practical procedure for determining the total insulation strength of multiple or composite insulations most commonly used in the design of overhead distribution lines. Laboratory test data were obtained on a wide range of combinations and configurations utilizing porcelain, polymer and fiberglass insulators as well as wood poles and wood crossarms. Data were obtained for both dry and wet conditions with positive and negative polarities of the impulses.

  17. Modeling the Virtual Machine Launching Overhead under Fermicloud

    SciTech Connect

    Garzoglio, Gabriele; Wu, Hao; Ren, Shangping; Timm, Steven; Bernabeu, Gerard; Noh, Seo-Young

    2014-11-12

    FermiCloud is a private cloud developed by the Fermi National Accelerator Laboratory for scientific workflows. The Cloud Bursting module of the FermiCloud enables the FermiCloud, when more computational resources are needed, to automatically launch virtual machines to available resources such as public clouds. One of the main challenges in developing the cloud bursting module is to decide when and where to launch a VM so that all resources are most effectively and efficiently utilized and the system performance is optimized. However, based on FermiCloud’s system operational data, the VM launching overhead is not a constant. It varies with physical resource (CPU, memory, I/O device) utilization at the time when a VM is launched. Hence, to make judicious decisions as to when and where a VM should be launched, a VM launch overhead reference model is needed. The paper is to develop a VM launch overhead reference model based on operational data we have obtained on FermiCloud and uses the reference model to guide the cloud bursting process.

  18. Life cycle assessment of overhead and underground primary power distribution.

    PubMed

    Bumby, Sarah; Druzhinina, Ekaterina; Feraldi, Rebe; Werthmann, Danae; Geyer, Roland; Sahl, Jack

    2010-07-15

    Electrical power can be distributed in overhead or underground systems, both of which generate a variety of environmental impacts at all stages of their life cycles. While there is considerable literature discussing the trade-offs between both systems in terms of aesthetics, safety, cost, and reliability, environmental assessments are relatively rare and limited to power cable production and end-of-life management. This paper assesses environmental impacts from overhead and underground medium voltage power distribution systems as they are currently built and managed by Southern California Edison (SCE). It uses process-based life cycle assessment (LCA) according to ISO 14044 (2006) and SCE-specific primary data to the extent possible. Potential environmental impacts have been calculated using a wide range of midpoint indicators, and robustness of the results has been investigated through sensitivity analysis of the most uncertain and potentially significant parameters. The studied underground system has higher environmental impacts in all indicators and for all parameter values, mostly due to its higher material intensity. For both systems and all indicators the majority of impact occurs during cable production. Promising strategies for impact reduction are thus cable failure rate reduction for overhead and cable lifetime extension for underground systems. PMID:20553042

  19. Medial Epicondyle Fractures in the Pediatric Overhead Athlete.

    PubMed

    Cruz, Aristides I; Steere, Joshua T; Lawrence, J Todd R

    2016-06-01

    The medial epicondyle serves as the proximal attachment of the medial ulnar collateral ligament and the origin of the flexor pronator musculature and as such it is responsible for resisting the main static and dynamic restraints to valgus force at the elbow. Fractures through the physis in the developing elbow are common and treatment remains controversial. Biomechanical modeling predicts that anterior should be the direction of greatest displacement. Anatomic considerations predict that anterior displacement should have the greatest effect on elbow stability and range of motion making the ulnar collateral ligament too loose in flexion and too tight in extension and potentially leading to valgus laxity in flexion and a block to full extension. In the elite overhead athlete, where elbow stability is critical both for sports performance and the long-term health of the elbow, assessment of anterior displacement is thus theoretically an important consideration. Standard radiographic views cannot adequately assess anterior displacement. Specialized radiographs and 3-dimensional modalities such as computerized tomography and magnetic resonance imaging can adequately assess anterior displacement and in the overhead athlete can sometimes aid in the decision-making process. Here, we present a review of the current literature and the rationale for a treatment algorithm for medial epicondyle fractures in the skeletally immature overhead athlete. PMID:27100037

  20. Parallel garbage collection without synchronization overhead. Technical report

    SciTech Connect

    Patel, J.H.

    1984-08-01

    Incremental garbage-collection schemes incur substantial overhead that is directly translated as reduced execution efficiency for the user. Parallel garbage-collection schemes implemented via time-slicing on a serial processor also incur this overhead, which might even be aggravated due to context switching. It is useful, therefore, to examine the possibility of implementing a parallel garbage-collection algorithm using a separate processor operating asynchronously with the main-list processor. The overhead in such a scheme arises from the synchronization necessary to manage the two processors, maintaining memory consistency. In this paper, the authors present an architecture and supporting parallel garbage-collection algorithms designed for a virtual memory system with separate processors for list processing and for garbage collection. Each processor has its own primary memory; in addition, there is a small common memory which both processors may access. Individual memories swap off a common secondary memory, but no locking mechanism is required. In particular, a page may reside in both memories simultaneously, and indeed may be accessed and modified freely by each processor. A secondary memory controller ensures consistency without necessitating numerous lockouts on the pages.

  1. Commercial and Industrial Wiring.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; Flowers, Gary

    This module is the third in a series of three wiring publications, includes additional technical knowledge and applications required for job entry in the commercial and industrial wiring trade. The module contains 15 instructional units that cover the following topics: blueprint reading and load calculations; tools and equipment; service;…

  2. 2016 MOST WIRED.

    PubMed

    Barr, Paul; Butcher, Lola; Hoppszallern, Suzanna

    2016-07-01

    This year's IT survey shows that hospitals are aggressively fighting cyber crime and looking for ways to use data to help in the transition to value-based care. Find out who made the 2016 lists of Most Wired, Most Advanced, Most Improved and Most Wired-Small and Rural. PMID:27526506

  3. The exploding wire phenomenon

    NASA Astrophysics Data System (ADS)

    Aspden, H.

    1985-02-01

    Graneau's recent interpretation of the exploding wire phenomenon as an electrodynamic effect verifying Ampère's classical formulation is questioned. Instead, it is shown that the rupturing force arising from the imbalance of the self-induced electromotive force and the ohmic potential during an explosive current surge will account for the wire breaking into several segments, as is observed.

  4. Water Desalination with Wires.

    PubMed

    Porada, S; Sales, B B; Hamelers, H V M; Biesheuvel, P M

    2012-06-21

    We show the significant potential of water desalination using a novel capacitive wire-based technology in which anode/cathode wire pairs are constructed from coating a thin porous carbon electrode layer on top of electrically conducting rods (or wires). By alternately dipping an array of electrode pairs in freshwater with and in brine without an applied cell voltage, we create an ion adsorption/desorption cycle. We show experimentally how in six subsequent cycles we can reduce the salinity of 20 mM feed (brackish) water by a factor of 3, while application of a cation exchange membrane on the cathode wires makes the desalination factor increase to 4. Theoretical modeling rationalizes the experimental findings, and predicts that system performance can be significantly enhanced by material modifications. To treat large volumes of water, multiple stacks of wire pairs can be used simultaneously in a "merry-go-round" operational mode. PMID:26285717

  5. International space station wire program

    NASA Technical Reports Server (NTRS)

    May, Todd

    1995-01-01

    Hardware provider wire systems and current wire insulation issues for the International Space Station (ISS) program are discussed in this viewgraph presentation. Wire insulation issues include silicone wire contamination, Tefzel cold temperature flexibility, and Russian polyimide wire insulation. ISS is a complex program with hardware developed and managed by many countries and hundreds of contractors. Most of the obvious wire insulation issues are known by contractors and have been precluded by proper selection.

  6. Characterization of vertical electric fields and associated voltages induced on a overhead power line from close artificially initiated lightning

    NASA Technical Reports Server (NTRS)

    Rubinstein, Marcos; Uman, Martin A.; Thomson, Ewen M.; Medelius, Pedro J.

    1991-01-01

    Measurements were characterized of simultaneous vertical electric fields and voltages induced at both ends of a 448 m overhead power line by artificially initiated lightning return strokes. The lightning discharges struck ground about 20 m from one end of the line. The measured line voltages could be grouped into two categories: those in which multiple, similarly shaped, evenly spaced pulses were observed, which are called oscillatory; and those dominated by a principal pulse with subsidiary oscillations of much smaller amplitude, which are called impulsive. Voltage amplitudes range from tens of kilovolts for oscillatory voltages to hundreds of kilovolts for impulsive voltages.

  7. SRTM is removed from Endeavour's payload bay to ease wiring inspections

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Orbiter Processing Facility, workers observe as an overhead crane lowers the Shuttle Radar Topography Mission (SRTM) into a payload canister. The payload on mission STS-99, SRTM was removed from orbiter Endeavour's payload bay to allow technicians access to the orbiter's midbody for planned wiring inspections. The entire fleet of orbiters is being inspected for wiring abrasions after the problem was first discovered in Columbia. Shuttle managers are reviewing several manifest options and could establish new target launch dates for the balance of 1999 next week. Shuttle Endeavour currently remains slated for launch in early October.

  8. SRTM is removed from Endeavour's payload bay to ease wiring inspections

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Workers inside orbiter Endeavour's payload bay observe as an overhead crane maneuvers to lift the Shuttle Radar Topography Mission (SRTM) for its transfer out of the orbiter to a payload canister. The payload on mission STS-99, SRTM is being removed to allow technicians access to the orbiter's midbody for planned wiring inspections. Endeavour is in the Orbiter Processing Facility. The entire fleet of orbiters is being inspected for wiring abrasions after the problem was first discovered in Columbia. Shuttle managers are reviewing several manifest options and could establish new target launch dates for the balance of 1999 next week. Shuttle Endeavour currently remains slated for launch in early October.

  9. Next Generation Wiring

    NASA Technical Reports Server (NTRS)

    Medelius, Petro; Jolley, Scott; Fitzpatrick, Lilliana; Vinje, Rubiela; Williams, Martha; Clayton, LaNetra; Roberson, Luke; Smith, Trent; Santiago-Maldonado, Edgardo

    2007-01-01

    Wiring is a major operational component on aerospace hardware that accounts for substantial weight and volumetric space. Over time wire insulation can age and fail, often leading to catastrophic events such as system failure or fire. The next generation of wiring must be reliable and sustainable over long periods of time. These features will be achieved by the development of a wire insulation capable of autonomous self-healing that mitigates failure before it reaches a catastrophic level. In order to develop a self-healing insulation material, three steps must occur. First, methods of bonding similar materials must be developed that are capable of being initiated autonomously. This process will lead to the development of a manual repair system for polyimide wire insulation. Second, ways to initiate these bonding methods that lead to materials that are similar to the primary insulation must be developed. Finally, steps one and two must be integrated to produce a material that has no residues from the process that degrades the insulating properties of the final repaired insulation. The self-healing technology, teamed with the ability to identify and locate damage, will greatly improve reliability and safety of electrical wiring of critical systems. This paper will address these topics, discuss the results of preliminary testing, and remaining development issues related to self-healing wire insulation.

  10. Orbiter Kapton wire operational requirements and experience

    NASA Technical Reports Server (NTRS)

    Peterson, R. V.

    1994-01-01

    The agenda of this presentation includes the Orbiter wire selection requirements, the Orbiter wire usage, fabrication and test requirements, typical wiring installations, Kapton wire experience, NASA Kapton wire testing, summary, and backup data.

  11. Dual wire weld feed proportioner

    NASA Technical Reports Server (NTRS)

    Nugent, R. E.

    1968-01-01

    Dual feed mechanism enables proportioning of two different weld feed wires during automated TIG welding to produce a weld alloy deposit of the desired composition. The wires are fed into the weld simultaneously. The relative feed rates of the wires and the wire diameters determine the weld deposit composition.

  12. Field evaluation of a modified intervention for overhead drilling.

    PubMed

    Rempel, David; Star, Demetra; Barr, Alan; Blanco, Marco Mendoza; Janowitz, Ira

    2010-04-01

    Drilling holes into concrete or metal ceilings is one of the most physically demanding tasks performed in construction. The work is done overhead with rotary impact hammer drills that weigh up to 40 N. The task is associated with pain and musculoskeletal disorders at the wrist, forearm, shoulder, and back. The mechanism of injury is thought to be the high forces and non-neutral shoulder and wrist postures applied during drilling. Previously, we described a field study of a foot lever and inverted drill press intervention devices that received poor usability ratings compared with the usual method for overhead drilling based on problems with mobility and productivity. Using a participatory intervention model, feedback from construction workers (N = 13) was used to develop a new intervention design that incorporated a wheeled tripod base and a unique method of aligning the drilling column to vertical. A different group of construction workers (N = 23) evaluated usability and fatigue of the new device during their regular overhead drilling in comparison with the usual method. Four of 12 usability ratings were significantly better with the intervention device compared with the usual method. Subjective shoulder fatigue was less with the new intervention (1.1 vs. 3.3; scale 0 to 5; p < 0.001). This difference was supported by objective outcome measures; the mean hand forces during drilling were 26 N with the intervention compared with 245 N with the usual method. The percentage of time with the shoulder flexed or abducted to more than 60 degrees was less with the intervention compared with the usual method (21 vs. 40%; p = 0.007). There was significantly less head extension with the intervention compared with the usual method. There were no significant differences in overall productivity between the two methods. This study demonstrates that a new intervention device for overhead drilling has improved usability and subjective fatigue ratings compared with the usual method

  13. Path-sensitive analysis for reducing rollback overheads

    SciTech Connect

    O'Brien, John K.P.; Wang, Kai-Ting Amy; Yamashita, Mark; Zhuang, Xiaotong

    2014-07-22

    A mechanism is provided for path-sensitive analysis for reducing rollback overheads. The mechanism receives, in a compiler, program code to be compiled to form compiled code. The mechanism divides the code into basic blocks. The mechanism then determines a restore register set for each of the one or more basic blocks to form one or more restore register sets. The mechanism then stores the one or more register sets such that responsive to a rollback during execution of the compiled code. A rollback routine identifies a restore register set from the one or more restore register sets and restores registers identified in the identified restore register set.

  14. Evaluation of an overhead line forecast rating algorithm

    SciTech Connect

    Foss, S.D. ); Maraio, R.A. )

    1992-07-01

    A forecast rating scheme that accounts for the cyclic and random variation in ratings over time is essential to practical field application of dynamic overhead line rating. In principle, dynamic line ratings apply only for the instant in time in which the field data are measured. As time proceeds, the likelihood that the dynamic line ratings continue to remain valid diminishes. This paper evaluates a forecast rating scheme and identifies the degree of conservatism that needs to be applied if dynamic line rating is to be a viable field concept.

  15. Generating Water-Soluble Noxious Gases: An Overhead Projector Demonstration

    NASA Astrophysics Data System (ADS)

    Solomon, Sally; Oliver-Hoyo, Maria; Hur, Chinhyu

    1998-12-01

    A simple, inexpensive apparatus to generate and collect water-soluble noxious gases as an overhead projector demonstration can be made from two small beakers and a Petri dish. The detection and generation of sulfur dioxide and nitrogen dioxide are described. Sulfur dioxide dissolved in water is detected using an acid-base indicator, decolorizing of anthocyanin, or reduction of permanganate. The SO2 is generated by addition of sulfite or bisulfite to a strong acid or by the addition of concentrated sulfuric acid to sugars. Nitrogen dioxide is generated by mixing copper and nitric acid and detected using an acid-base indicator.

  16. Evaluation of Impingement Syndromes in the Overhead-Throwing Athlete

    PubMed Central

    Jobe, Christopher M.; Coen, Michael J.; Screnar, Pat

    2000-01-01

    Objective: We outline impingement entities, describe the history and physical examination, and provide an overview of treatment beyond that routinely used in glenohumeral and scapulothoracic dysfunction. Background: In the athlete, pain and dysfunction due to excessive overhead use or abnormal positioning of the shoulder is common and can result from multiple etiologies, including impingement syndromes. Primary, secondary, internal, and coracoid impingement have all been described. Description: These entities will be discussed, including pathology, evaluation, and treatment. Clinical Advantages: Incorporating a systematic evaluation and treatment of impingement syndromes optimizes care for the patient with shoulder pain. PMID:16558643

  17. Contamination source review for Building E3613, Edgewood Area, Aberdeen Proving Ground, Maryland

    SciTech Connect

    Billmark, K.A.; Emken, M.E.; Muir-Ploense, K.L.

    1995-09-01

    This report was prepared by Argonne National Laboratory (ANL) to document the results of a contamination source review of Building E3613 at the Aberdeen Proving Ground (APG) in Maryland. The report may be used to assist the U.S. Army in planning for the future use or disposition of this building, The review included a historical records search, physical inspection, photographic documentation, geophysical investigation, and collection of air samples. The field investigations were performed by ANL during 1994 and 1995. Building E3613 (APG designation) is located in the Canal Creek Area of APG. The building was constructed in 1954 for use as a change house, office, and storage building in support of the white phosphorus smoke program. The building has not been used since 1988. During an inspection in 1988, asbestos was listed as the only potential contaminant. The physical inspection and photographic documentation of Building E3613 were completed in November 1994. At the time of the inspection, Building E3613 was inactive and in disrepair. The single-story, rectangular structure contains five rooms and measures 16 ft 2 in. by 32 ft. The building is wood frame construction with a gabled roof. The exterior walls and roof are constructed of wood covered with asphalt sheeting. The building rests on a concrete foundation. The interior walls are 6-in.-thick wood, and the ceiling is assumed to be white drywall nailed to a wooden frame. Overhead steam pipes supported by vertical pipes traverse the area. Two concrete footings for guy wires that support the overhead steam pipes are located north and west of the building. Four additional vertical pipes exit the ground east of the building.

  18. Active Ground Optical Remote Sensing for Improved Monitoring of Seedling Stress in Nurseries

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Active ground optical remote sensing (AGORS) devices mounted on overhead irrigation booms could help to improve seedling quality by autonomously monitoring seedling stress. In contrast to traditionally used passive optical sensors, AGORS devices operate independently of ambient light conditions and ...

  19. Thermal Model of a Current-Carrying Wire in a Vacuum

    NASA Technical Reports Server (NTRS)

    Border, James

    2006-01-01

    A computer program implements a thermal model of an insulated wire carrying electric current and surrounded by a vacuum. The model includes the effects of Joule heating, conduction of heat along the wire, and radiation of heat from the outer surface of the insulation on the wire. The model takes account of the temperature dependences of the thermal and electrical properties of the wire, the emissivity of the insulation, and the possibility that not only can temperature vary along the wire but, in addition, the ends of the wire can be thermally grounded at different temperatures. The resulting second-order differential equation for the steady-state temperature as a function of position along the wire is highly nonlinear. The wire is discretized along its length, and the equation is solved numerically by use of an iterative algorithm that utilizes a multidimensional version of the Newton-Raphson method.

  20. Splicing Wires Permanently With Explosives

    NASA Technical Reports Server (NTRS)

    Bement, Laurence J.; Kushnick, Anne C.

    1990-01-01

    Explosive joining process developed to splice wires by enclosing and metallurgically bonding wires within copper sheets. Joints exhibit many desirable characteristics, 100-percent conductivity and strength, no heat-induced annealing, no susceptibility to corrosion in contacts between dissimilar metals, and stability at high temperature. Used to join wires to terminals, as well as to splice wires. Applicable to telecommunications industry, in which millions of small wires spliced annually.

  1. NASA/BAE SYSTEMS SpaceWire Effort

    NASA Technical Reports Server (NTRS)

    Rakow, Glenn Parker; Schnurr, Richard G.; Kapcio, Paul

    2003-01-01

    This paper discusses the state of the NASA and BAE SYSTEMS developments of SpaceWire. NASA has developed intellectual property that implements SpaceWire in Register Transfer Level (RTL) VHDL for a SpaceWire link and router. This design has been extensively verified using directed tests from the SpaceWire Standard and design specification, as well as being randomly tested to flush out hard to find bugs in the code. The high level features of the design will be discussed, including the support for multiple time code masters, which will be useful for the James Webb Space Telescope electrical architecture. This design is now ready to be targeted to FPGA's and ASICs. Target utilization and performance information will be presented for Spaceflight worthy FPGA's and a discussion of the ASIC implementations will be addressed. In particular, the BAE SYSTEMS ASIC will be highlighted which will be implemented on their .25micron rad-hard line. The chip will implement a 4-port router with the ability to tie chips together to make larger routers without external glue logic. This part will have integrated LVDS drivers/receivers, include a PLL and include skew control logic. It will be targeted to run at greater than 300 MHz and include the implementation for the proposed SpaceWire transport layer. The need to provide a reliable transport mechanism for SpaceWire has been identified by both NASA And ESA, who are attempting to define a transport layer standard that utilizes a low overhead, low latency connection oriented approach that works end-to-end. This layer needs to be implemented in hardware to prevent bottlenecks.

  2. Does scapular positioning predict shoulder pain in recreational overhead athletes?

    PubMed

    Struyf, F; Nijs, J; Meeus, M; Roussel, N A; Mottram, S; Truijen, S; Meeusen, R

    2014-01-01

    The objective of this prospective study is to investigate possible scapular related risk factors for developing shoulder pain. Therefore, a 2-year follow-up study in a general community sports centre setting was conducted. A sample of convenience of 113 recreational overhead athletes (59 women and 54 men) with a mean age of 34 (17-64; SD 12) years were recruited. At baseline, visual observation for scapular dyskinesis, measured scapular protraction, upward scapular rotation and dynamic scapular control were evaluated. 22% (n=25) of all athletes developed shoulder pain during the 24 months following baseline assessment. The Mean Shoulder Disability Questionnaire (SDQ) score for the painful shoulders was 34.8 (6.3-62.5; SD 17.4). None of the scapular characteristics predicted the development of shoulder pain. However, the athletes that developed shoulder pain demonstrated significantly less upward scapular rotation at 45° (p=0.010) and 90° (p=0.016) of shoulder abduction in the frontal plane at baseline in comparison to the athletes that remained pain-free. In conclusion, although these scapular characteristics are not of predictive value for the development of shoulder pain, this study increases our understanding of the importance of a scapular upward rotation assessment among recreational overhead athletes. PMID:23825003

  3. TAUOVERSUPERMON: LOW-OVERHEAD ONLINE PARALLEL PERFORMANCE MONITORING

    SciTech Connect

    SOTTILE, MATTHEW JOSEPH; NATARAJ, AROON; MALONY, ALLEN; MORRIS, ALAN; SHENDE, SAMEER

    2007-01-30

    Online or Real-time application performance monitoring allows tracking performance characteristics during execution as opposed to doing so post-mortem. This opens up several possibilities otherwise unavailable such as real-time visualization and application performance steering that can be useful in the context of long-running applications. Two fundamental components that constitute such a performance monitor are the measurement and transport systems. The former captures performance metrics of individual contexts (processes, threads). The latter enables querying the parallel/distributed state from the different contexts and also allows measurement control. As HPC systems grow in size and complexity, the key challenge is to keep the online performance monitor scalable and low overhead while still providing a useful performance reporting capability. We adapt and combine two existing, mature systems - Tuning and Analysis Utility (TAU) and Supermon - to address this problem. Tau performs the measurement while Supermon is used to collect the distributed measurement state. Our experiments show that this novel approach of using a cluster-monitor, Supermon, as the transport for online performance data from Tau leads to very low-overhead application monitoring as well as other beneits unavailable from using a traditional transport such as NFS.

  4. Output gating performance overhead elimination for scan test

    NASA Astrophysics Data System (ADS)

    Suhag, Ashok Kumar; Ahlawat, Satdev; Shrivastava, Vivek; Choudhary, Rahul Raj

    2015-07-01

    Switching activity is much higher in test mode as compared to normal mode of operation which causes higher power dissipation, and this leads to several reliability issues. Output gating is proposed as a very effective low-power test technique, which is used to eliminate redundant switching activity in the combinational logic of circuit under test (CUT) during the shifting of test vectors in a scan chain. This method reduces the average power significantly, but it introduces performance overhead in normal mode of operation. In this work, a new output gating technique is proposed which eliminates redundant switching activity in combinational logic of CUT during shifting of test vectors without any negative impact on performance as compared to earlier proposed output gating techniques. The proposed design also improves the performance of the scan flop in functional mode with negligible area overhead incurred due to extra transistors. Experimental results show that our design has a more robust performance over wide range of capacitive load as compared to earlier designs.

  5. CLOMP: Accurately Characterizing OpenMP Application Overheads

    SciTech Connect

    Bronevetsky, G; Gyllenhaal, J; de Supinski, B R

    2008-11-10

    Despite its ease of use, OpenMP has failed to gain widespread use on large scale systems, largely due to its failure to deliver sufficient performance. Our experience indicates that the cost of initiating OpenMP regions is simply too high for the desired OpenMP usage scenario of many applications. In this paper, we introduce CLOMP, a new benchmark to characterize this aspect of OpenMP implementations accurately. CLOMP complements the existing EPCC benchmark suite to provide simple, easy to understand measurements of OpenMP overheads in the context of application usage scenarios. Our results for several OpenMP implementations demonstrate that CLOMP identifies the amount of work required to compensate for the overheads observed with EPCC.We also show that CLOMP also captures limitations for OpenMP parallelization on SMT and NUMA systems. Finally, CLOMPI, our MPI extension of CLOMP, demonstrates which aspects of OpenMP interact poorly with MPI when MPI helper threads cannot run on the NIC.

  6. Steal Tree: Low-Overhead Tracing of Work Stealing Schedulers

    SciTech Connect

    Lifflander, Jonathan; Krishnamoorthy, Sriram; Kale, Laxmikant

    2013-06-16

    Work stealing is a popular approach to scheduling task-parallel programs. The flexibility inherent in work stealing when dealing with load imbalance results in seemingly irregular computation structures, complicating the study of its runtime behavior. In this paper, we present an approach to efficiently trace async-finish parallel programs scheduled using work stealing. We identify key properties that allow us to trace the execution of tasks with low time and space overheads. We also study the usefulness of the proposed schemes in supporting algorithms for data-race detection and retentive steal- ing presented in the literature. We demonstrate that the perturbation due to tracing is within the variation in the execution time with 99% confidence and the traces are concise, amounting to a few tens of kilobytes per thread in most cases. We also demonstrate that the traces enable significant reductions in the cost of detecting data races and result in low, stable space overheads in supporting retentive stealing for async-finish programs.

  7. 30 CFR 75.701-5 - Use of grounding connectors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Use of grounding connectors. 75.701-5 Section... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-5 Use of grounding connectors. The attachment of grounding wires to a mine track or other grounded power conductor will...

  8. 30 CFR 75.701-5 - Use of grounding connectors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Use of grounding connectors. 75.701-5 Section... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-5 Use of grounding connectors. The attachment of grounding wires to a mine track or other grounded power conductor will...

  9. Software in the DOE: The Hidden Overhead of''The Build''

    SciTech Connect

    Kumfert, G; Epperly, T

    2002-02-28

    ''The Build'' is the infrastructure needed to convert software from source code to usable form. It is intimately tied to the software it supports, knowing about every file and automating every transformation needed to produce a working program. Every developer knows that a project spends some labor overhead on ''the build.'' How big is this hidden overhead? According to 34 scientific software developers we surveyed at Lawrence Livermore National Labs, among colleagues at other DOE labs, and a handful of academics the ''perceived'' overhead averages around 12%. Individual cases of 20% to 30% were not uncommon. In one project claiming a 20% overhead, we found supporting evidence by combing through their CVS repository.

  10. Effect of electrode polarity on wire explosion in vacuum

    SciTech Connect

    Rousskikh, A. G.; Pil'tikhina, D; Baksht, R. B.; Beilis, I. I.; Chaikovsky, S. A.

    2008-07-01

    This paper presents experimental results on electrical explosions of thin tungsten wires at wire currents of 0.04-0.4 kA and current rise times of several tens of nanoseconds. The experiment was performed for both negative and positive polarity of the high-voltage electrode. In addition to conventional current and voltage measurements, the current to a grounded cylindrical collector placed between the exploded wire and the return conductor was measured. The collector current was observed only for a 6 {mu}m wire exploded with the high-voltage electrode being at a negative potential. In all other test modes (a 6 {mu}m wire exploded with electrode positive polarity, 6 {mu}m wire exploded with electrodes enclosed in ceramic tubes, 30 {mu}m wires exploded with electrode negative and positive polarities) no collector current was detected. A model of the discharge initiation during a wire explosion (WE) in vacuum has been proposed which is based on the supposition that a surface discharge develops over the electrodes. The presence of plasma-emitted electrons at the cathode surface makes it possible to interpret the experimental results on WEs at different electrode polarities reported both in this paper and in previous publications.

  11. 46 CFR 98.30-13 - Ground connection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... vessel by a— (1) Cargo hose constructed with an integral grounding wire if the end connections are used for electrical continuity; or (2) Separate grounding that is maintained until the cargo hose...

  12. 49 CFR 234.213 - Grounds.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: circuits that include track rail; alternating current power distribution circuits that are grounded in the...) Circuits that include track rail; (2) Alternating current power distribution circuits that are grounded in... internal to semiconductor-based memory; and (5) Common return wires of grounded common return single...

  13. Thermal Testing and Integration: Magnetospheric MultiScale (MMS) Observatories with Digital 1-Wire Sensors

    NASA Technical Reports Server (NTRS)

    Solimani, Jason A.; Rosanova, Santino

    2015-01-01

    Thermocouples require two thin wires to be routed out of the spacecraft to connect to the ground support equipment used to monitor and record the temperature data. This large number of wires that exit the observatory complicates integration and creates an undesirable heat path during testing. These wires exiting the spacecraft need to be characterized as a thermal short that will not exist during flight. To minimize complexity and reduce thermal variables from these ground support equipment (GSE) wires, MMS pursued a hybrid path for temperature monitoring, utilizing thermocouples and digital 1-wire temperature sensors. Digital 1-wire sensors can greatly reduce harness mass, length and complexity as they can be spliced together. For MMS, 350 digital 1-wire sensors were installed on the spacecraft with only 18 wires exiting as opposed to a potential 700 thermocouple wires. Digital 1-wire sensors had not been used in such a large scale at NASAGSFC prior to the MMS mission. During the MMS thermal vacuum testing a lessons learned matrix was formulated that will assist future integration of 1-wires into thermal testing and one day into flight.

  14. Wire brush fastening device

    SciTech Connect

    Meigs, R.A.

    1993-08-31

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus.

  15. Wire brush fastening device

    DOEpatents

    Meigs, Richard A.

    1995-01-01

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus.

  16. Wire brush fastening device

    DOEpatents

    Meigs, R.A.

    1995-09-19

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus. 13 figs.

  17. Dielectric coated wire antennas

    NASA Technical Reports Server (NTRS)

    Richmond, J. H.; Newman, E. H.

    1976-01-01

    An electrically thin dielectric insulating shell on an antenna composed of electrically thin circular cylindrical wires is examined. A moment method solution is obtained, and the insulating shell is modeled by equivalent volume polarization currents. These polarization currents are related in a simple manner to the surface charge density on the wire antenna. In this way the insulating shell causes no new unknowns to be introduced, and the size of the impedance matrix is the same as for the uninsulated wires. The insulation is accounted for entirely through a modification of the symmetric impedance matrix. This modification influences the current distribution, impedance, efficiency, field patterns, and scattering properties. The theory is compared with measurement for dielectric coated antennas in air.

  18. Increased range of ultrasonic guided wave testing of overhead transmission line cables using dispersion compensation.

    PubMed

    Legg, Mathew; Yücel, Mehmet K; Kappatos, Vassilios; Selcuk, Cem; Gan, Tat-Hean

    2015-09-01

    Overhead Transmission Line (OVTL) cables can experience structural defects and are, therefore, inspected using Non-Destructive Testing (NDT) techniques. Ultrasonic Guided Waves (UGW) is one NDT technique that has been investigated for inspection of these cables. For practical use, it is desirable to be able to inspect as long a section of cable as possible from a single location. This paper investigates increasing the UGW inspection range on Aluminium Conductor Steel Reinforced (ACSR) cables by compensating for dispersion using dispersion curve data. For ACSR cables, it was considered to be difficult to obtain accurate dispersion curves using modelling due to the complex geometry and unknown coupling between wire strands. Group velocity dispersion curves were, therefore, measured experimentally on an untensioned, 26.5m long cable and a method of calculating theoretical dispersion curves was obtained. Attenuation and dispersion compensation were then performed for a broadband Maximum Length Sequence (MLS) excitation signal. An increase in the Signal to Noise Ratio (SNR) of about 4-8dB compared to that of the dispersed signal was obtained. However, the main benefit was the increased ability to resolve the individual echoes from the end of the cable and an introduced defect in the form of a cut, which was 7 to at least 13dB greater than that of the dispersed signal. Five echoes were able to be clearly detected using MLS excitation signal, indicating the potential for an inspection range of up to 130m in each direction. To the best of the authors knowledge, this is the longest inspection range for ACSR cables reported in the literature, where typically cables, which were only one or two meter long, have been investigated previously. Narrow band tone burst and Hann windowed tone burst excitation signal also showed increased SNR and ability to resolve closely spaced echoes. PMID:25991388

  19. Flying wires at Fermilab

    SciTech Connect

    Gannon, J.; Crawford, C.; Finley, D.; Flora, R.; Groves, T.; MacPherson, M.

    1989-03-01

    Transverse beam profile measurement systems called ''Flying Wires'' have been installed and made operational in the Fermilab Main Ring and Tevatron accelerators. These devices are used routinely to measure the emittance of both protons and antiprotons throughout the fill process, and for emittance growth measurements during stores. In the Tevatron, the individual transverse profiles of six proton and six antiproton bunches are obtained simultaneously, with a single pass of the wire through the beam. Essential features of the hardware, software, and system operation are explained in the rest of the paper. 3 refs., 4 figs.

  20. SHOULDER POSTERIOR INTERNAL IMPINGEMENT IN THE OVERHEAD ATHLETE

    PubMed Central

    Grant‐Nierman, Meggan; Lucas, Brennen

    2013-01-01

    Posterior internal impingement (PII) of the glenohumeral joint is a common cause of shoulder complex pain in the overhead athlete. This impingement is very different from standard outlet impingement seen in shoulder patients. Internal impingement is characterized by posterior shoulder pain when the athlete places the humerus in extreme external rotation and abduction as in the cocking phase of pitching or throwing. Impingement in this position occurs between the supraspinatus and or infraspinatus and the glenoid rim. Understanding regarding this pathology continues to evolve. Definitive understanding of precipitating factors, causes, presentation and methods of treatment have yet to be determined. A high index of suspicion should be used when attempting to make this diagnosis. This current concepts review presents the current thinking regarding pathophysiology, evaluation, and treatment of this condition. Level of Evidence: 5 PMID:23593557

  1. Phase Sensitive Cueing for 3D Objects in Overhead Images

    SciTech Connect

    Paglieroni, D W; Eppler, W G; Poland, D N

    2005-02-18

    A 3D solid model-aided object cueing method that matches phase angles of directional derivative vectors at image pixels to phase angles of vectors normal to projected model edges is described. It is intended for finding specific types of objects at arbitrary position and orientation in overhead images, independent of spatial resolution, obliqueness, acquisition conditions, and type of imaging sensor. It is shown that the phase similarity measure can be efficiently evaluated over all combinations of model position and orientation using the FFT. The highest degree of similarity over all model orientations is captured in a match surface of similarity values vs. model position. Unambiguous peaks in this surface are sorted in descending order of similarity value, and the small image thumbnails that contain them are presented to human analysts for inspection in sorted order.

  2. Wiring for space applications program

    NASA Technical Reports Server (NTRS)

    Hammoud, Ahmad

    1994-01-01

    The insulation testing and analysis consists of: identifying and prioritizing NASA wiring requirements; selecting candidate wiring constructions; developing test matrix and formulating test program; managing, coordinating, and conducting tests; and analyzing and documenting data, establishing guidelines and recommendations.

  3. NewsWire, 2002.

    ERIC Educational Resources Information Center

    Byrom, Elizabeth, Ed.; Bingham, Margaret, Ed.; Bowman, Gloria, Ed.; Shoemaker, Dan, Ed.

    2002-01-01

    This document presents the 3 2002 issues of the newsletter "NewsWire," (volume 5). Issue Number One focuses on collaborative Web projects. This issue begins with descriptions of four individual projects: "iEARN"; "Operation RubyThroat"; "Follow the Polar Huskies!"; and "Log in Your Animal Roadkill!" Features that follow include: "Bringing the…

  4. Basic Wiring. Second Edition.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; And Others

    This guide is designed to assist teachers conducting a foundation course to prepare students for additional courses of training for entry-level employment in either the residential or commercial and industrial wiring trades. Included in the guide are 17 instructional units and the following sections of information for teachers: guidelines in using…

  5. Improved wire chamber

    DOEpatents

    Atac, M.

    1987-05-12

    An improved gas mixture for use with proportional counter devices, such as Geiger-Mueller tubes and drift chambers. The improved gas mixture provides a stable drift velocity while eliminating wire aging caused by prior art gas mixtures. The new gas mixture is comprised of equal parts argon and ethane gas and having approximately 0.25% isopropyl alcohol vapor. 2 figs.

  6. Caroviologens: Towards molecular wires

    NASA Astrophysics Data System (ADS)

    Blanchard-Desce, M.; Arrhenius, T. S.; Dvolaïtzky, M.; Kugimiya, S.-I.; Lazrak, T.; Lehn, J.-M.

    1992-07-01

    Bispyridinium conjugated polyenes of different lengths and charges have been synthesized. Since they combine the features of carotenoids and of viologens, they have been termed caroviologens. Such molecules, possessing an extended conjugated chain fitted with polar electroactive endgroups, and having a length sufficient to span a lipid membrane could function as transmembrane electron channels, i.e., as molecular wires.

  7. A World without Wires

    ERIC Educational Resources Information Center

    Panettieri, Joseph C.

    2006-01-01

    The wireless bandwagon is rolling across Mississippi, picking up a fresh load of converts and turning calamity into opportunity. Traditional wired school networks, many of which unraveled during Hurricane Katrina, are giving way to advanced wireless mesh networks that frequently include voice-over-IP (VoIP) capabilities. Vendor funding is helping…

  8. Residential Wiring. Second Edition.

    ERIC Educational Resources Information Center

    Taylor, Mark; And Others

    This guide is designed to assist teachers conducting a course to prepare students for entry-level employment in the residential wiring trade. Included in the guide are six instructional units and the following sections of information for teachers: guidelines in using the unit components; academic and workplace skills classifications and…

  9. A Comparison of the Effectiveness of Overhead Projection and Chalkboard in Teaching Music Notation.

    ERIC Educational Resources Information Center

    Hunt, David

    A research project was designed to test two hypotheses concerning the teaching of music notation: (1) the overhead projector would prove superior to the chalkboard as a teaching aid; and (2) the use of the overhead projector would cause students to retain knowledge better and score higher on standardized music tests. The study involved 93 students…

  10. How To Prepare Effective Overhead Projector Presentations: One Picture Is Worth a Thousand Words.

    ERIC Educational Resources Information Center

    National Audio-Visual Supply, East Rutherford, NJ.

    Designed to help create effective presentations, this guide describes the basic techniques and provides hints for producing professional, attention-getting overhead transparencies in a step-by-step procedure format. Eight topics are addressed in the guide: (1) eight steps to a successful meeting presentation; (2) advantages of overhead projection;…

  11. 31 CFR Appendix II(f) to Part 13 - Overhead and Administrative Costs

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Overhead and Administrative Costs II(F) Appendix II(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. II(F) Appendix II(F) to Part 13—Overhead and Administrative Costs Date: Select Only...

  12. 31 CFR Appendix I(f) to Part 13 - Estimated Overhead and Administrative Costs

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Estimated Overhead and Administrative Costs I(F) Appendix I(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. I(F) Appendix I(F) to Part 13—Estimated Overhead and Administrative Costs Date:...

  13. 31 CFR Appendix II(f) to Part 13 - Overhead and Administrative Costs

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Overhead and Administrative Costs II(F) Appendix II(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. II(F) Appendix II(F) to Part 13—Overhead and Administrative Costs Date: Select Only...

  14. 31 CFR Appendix I(f) to Part 13 - Estimated Overhead and Administrative Costs

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Estimated Overhead and Administrative Costs I(F) Appendix I(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. I(F) Appendix I(F) to Part 13—Estimated Overhead and Administrative Costs Date:...

  15. 30 CFR 77.203 - Use of material or equipment overhead; safeguards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Use of material or equipment overhead; safeguards. 77.203 Section 77.203 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...; safeguards. Where overhead repairs are being made at surface installations and equipment or material is...

  16. 30 CFR 77.203 - Use of material or equipment overhead; safeguards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Use of material or equipment overhead; safeguards. 77.203 Section 77.203 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...; safeguards. Where overhead repairs are being made at surface installations and equipment or material is...

  17. 75 FR 81661 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Overhead...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... information, see the related notice published in the Federal Register on July 28, 2010 (75 FR 44288...; Overhead and Gantry Cranes Standard ACTION: Notice. SUMMARY: The Department of Labor (DOL) hereby announces... collection request (ICR) titled, ``Overhead and Gantry Cranes Standard,'' to the Office of Management...

  18. Easily-wired toggle switch

    NASA Technical Reports Server (NTRS)

    Dean, W. T.; Stringer, E. J.

    1979-01-01

    Crimp-type connectors reduce assembly and disassembly time. With design, no switch preparation is necessary and socket contracts are crimped to wires inserted in module attached to back of toggle switch engaging pins inside module to make electrical connections. Wires are easily removed with standard detachment tool. Design can accommodate wires of any gage and as many terminals can be placed on switch as wire gage and switch dimensions will allow.

  19. Wire EDM for Refractory Materials

    NASA Technical Reports Server (NTRS)

    Zellars, G. R.; Harris, F. E.; Lowell, C. E.; Pollman, W. M.; Rys, V. J.; Wills, R. J.

    1982-01-01

    In an attempt to reduce fabrication time and costs, Wire Electrical Discharge Machine (Wire EDM) method was investigated as tool for fabricating matched blade roots and disk slots. Eight high-strength nickel-base superalloys were used. Computer-controlled Wire EDM technique provided high quality surfaces with excellent dimensional tolerances. Wire EDM method offers potential for substantial reductions in fabrication costs for "hard to machine" alloys and electrically conductive materials in specific high-precision applications.

  20. 1997 wire development workshop: Proceedings

    SciTech Connect

    1997-04-01

    This conference is divided into the following sections: (1) First Generation Wires I; (2) First Generation Wires II; (3) Coated conductors I; and (4) Coated conductors II. Applications of the superconducting wires include fault current limiters, superconducting motors, transformers, and power transmission lines.

  1. Production of hot-wires

    NASA Astrophysics Data System (ADS)

    Dickinson, S. C.

    1983-04-01

    Several methods for producing hot-wire probes are described. Discussion includes the manufacture of probe bodies, soldering plated wires to the prongs etching Walaston type wires, and finishing the probe. This report is written as an instruction manual for researchers who desire to produce or repair their own sensors.

  2. LANSCE wire scanner AFE: analysis, design, and fabrication

    SciTech Connect

    Gruchalla, Mike; Chacon, Phillip; Gilpatrick, John D; Martinez, Derwin; Power, John F; Smith, Brian

    2010-01-01

    The goal of the design LANSCE-R Wire-Scanner Analog Front-end Electronics is to develop a high-performance, dual-axis wire-scanner analog front-end system implemented in a single cRIO module. This new design accommodates macropulse widths as wide as 700 {mu}s at a maximum pulse rate of 120Hz. A lossey integrator is utilized as the integration element to eliminate the requirement for providing gating signals to each wire scanner. The long macropulse and the high repetition rate present conflicting requirements for the design of the integrator. The long macropulse requires a long integration time constant to assure minimum integrator droop for accurate charge integration, and the high repetition rate requires a short time constant to assure adequate integrator reset between macropulses. Also, grounding is a serious concern due to the small signal levels. This paper reviews the basic Wire Scanner AFE system design implemented in the cRIO-module form factor to capture the charge information from the wire sensors and the grounding topology to assure minimum noise contamination of the wire signals.

  3. Excessive magnetic field flux density distribution from overhead isolated powerline conductors due to neutral line current.

    PubMed

    Netzer, Moshe

    2013-06-01

    Overhead isolated powerline conductors (hereinafter: "OIPLC") are the most compact form for distributing low voltage currents. From the known physics of magnetic field emission from 3-phase power lines, it is expected that excellent symmetry of the 120° shifted phase currents and where compact configuration of the 3-phase+neutral line exist, the phase current vectorial summation of the magnetic field flux density (MFFD) is expected to be extremely low. However, despite this estimation, an unexpectedly very high MFFD was found in at least three towns in Israel. This paper explains the reasons leading to high MFFD emissions from compact OIPLC and the proper technique to fix it. Analysis and measurement results had led to the failure hypothsis of neutral line poor connection design and poor grounding design of the HV-LV utility transformers. The paper elaborates on the low MFFD exposure level setup by the Israeli Environmental Protection Office which adopted a rather conservative precaution principal exposure level (2 mG averaged over 24 h). PMID:23675630

  4. 49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Insulation resistance tests, wires in trunking and... Inspections and Tests § 234.267 Insulation resistance tests, wires in trunking and cables. (a) Insulation... thereafter. (b) Insulation resistance tests shall be made between all conductors and ground,...

  5. 49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Insulation resistance tests, wires in trunking and... Inspections and Tests § 234.267 Insulation resistance tests, wires in trunking and cables. (a) Insulation... thereafter. (b) Insulation resistance tests shall be made between all conductors and ground,...

  6. 49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Insulation resistance tests, wires in trunking and... Inspections and Tests § 234.267 Insulation resistance tests, wires in trunking and cables. (a) Insulation... thereafter. (b) Insulation resistance tests shall be made between all conductors and ground,...

  7. Electrical Principles and Wiring Review. Courseware Evaluation for Vocational and Technical Education.

    ERIC Educational Resources Information Center

    Kaylor, Robert; And Others

    This courseware evaluation rates the Electrical Principles and Wiring Review program developed by Hobar Publications. (The program--not contained in this document--includes 400 test questions on basic electricity, grounding, transmission, measuring, and practical wiring practices.) Part A describes the program in terms of subject area and hardware…

  8. Silver-sheathed multifilament wires

    NASA Astrophysics Data System (ADS)

    Wu, C. T.; Goretta, K. C.; Shi, D.; Lanagan, M. T.; Poeppel, R. B.

    1991-01-01

    The process for manufacturing Ag-sheathed multifilament superconducting wires was investigated. Bi2Sr(1.7)CaCu2O(x), Pb-doped Bi2Sr2Ca2Cu3O(x), or YBa2Cu3O(x) powders were packed into Ag tubes and swaged into long wires. Pieces were cut from each wire, packed into a second Ag tube and swaged or rolled into multifilament wires. Each wire was then sintered to produce a superconductor. Processing considerations included the sheath workability, effects of compacting and residual stresses, and heat treatment schedules. The superconducting properties of the Bi-based wires were superior to those of the YBa2Cu3O(x) wires at 4.2 K, but not at 77 K.

  9. From wires to cosmology

    NASA Astrophysics Data System (ADS)

    Amin, Mustafa A.; Baumann, Daniel

    2016-02-01

    We provide a statistical framework for characterizing stochastic particle production in the early universe via a precise correspondence to current conduction in wires with impurities. Our approach is particularly useful when the microphysics is uncertain and the dynamics are complex, but only coarse-grained information is of interest. We study scenarios with multiple interacting fields and derive the evolution of the particle occupation numbers from a Fokker-Planck equation. At late times, the typical occupation numbers grow exponentially which is the analog of Anderson localization for disordered wires. Some statistical features of the occupation numbers show hints of universality in the limit of a large number of interactions and/or a large number of fields. For test cases, excellent agreement is found between our analytic results and numerical simulations.

  10. Dental Arch Wire

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Straightening teeth is an arduous process requiring months, often years, of applying corrective pressure by means of arch wires-better known as brace-which may have to be changed several times in the course of treatment. A new method has been developed by Dr. George Andreasen, orthodontist and dental scientist at the University of Iowa. The key is a new type of arch wire material, called Nitinol, with exceptional elasticity which helps reduce the required number of brace changes. An alloy of nickel and titanium, Nitinol was originally developed for aerospace applications by the Naval Ordnance Laboratory, now the Naval Surface Weapons Laboratory, White Oaks, Maryland. NASA subsequently conducted additional research on the properties of Nitinol and on procedures for processing the metal.

  11. 30 CFR 77.701-4 - Use of grounding connectors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Use of grounding connectors. 77.701-4 Section 77.701-4 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE... COAL MINES Grounding § 77.701-4 Use of grounding connectors. If ground wires are attached to...

  12. 30 CFR 77.701-4 - Use of grounding connectors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Use of grounding connectors. 77.701-4 Section 77.701-4 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE... COAL MINES Grounding § 77.701-4 Use of grounding connectors. If ground wires are attached to...

  13. Wiring for aerospace applications

    NASA Technical Reports Server (NTRS)

    Christian, J. L., Jr.; Dickman, J. E.; Bercaw, R. W.; Myers, I. T.; Hammoud, A. N.; Stavnes, M.; Evans, J.

    1992-01-01

    In this paper, the authors summarize the current state of knowledge of arc propagation in aerospace power wiring and efforts by the National Aeronautics and Space Administration (NASA) towards the understanding of the arc tracking phenomena in space environments. Recommendations will be made for additional testing. A database of the performance of commonly used insulating materials will be developed to support the design of advanced high power missions, such as Space Station Freedom and Lunar/Mars Exploration.

  14. Plated wire memory subsystem

    NASA Technical Reports Server (NTRS)

    Reynolds, L.; Tweed, H.

    1972-01-01

    The work performed entailed the design, development, construction and testing of a 4000 word by 18 bit random access, NDRO plated wire memory for use in conjunction with a spacecraft imput/output unit and central processing unit. The primary design parameters, in order of importance, were high reliability, low power, volume and weight. A single memory unit, referred to as a qualification model, was delivered.

  15. Dual wire welding torch and method

    DOEpatents

    Diez, Fernando Martinez; Stump, Kevin S.; Ludewig, Howard W.; Kilty, Alan L.; Robinson, Matthew M.; Egland, Keith M.

    2009-04-28

    A welding torch includes a nozzle with a first welding wire guide configured to orient a first welding wire in a first welding wire orientation, and a second welding wire guide configured to orient a second welding wire in a second welding wire orientation that is non-coplanar and divergent with respect to the first welding wire orientation. A method of welding includes moving a welding torch with respect to a workpiece joint to be welded. During moving the welding torch, a first welding wire is fed through a first welding wire guide defining a first welding wire orientation and a second welding wire is fed through a second welding wire guide defining a second welding wire orientation that is divergent and non-coplanar with respect to the first welding wire orientation.

  16. Wire detecting apparatus and method

    SciTech Connect

    Kronberg, J.W.

    1991-12-31

    This invention is comprised of an apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receiver`s position with respect to the wiring. The receiver`s audible signal is strongest when the receiver is directly above the wiring and the long axis of the receiver`s coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring`s concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest.

  17. Manually Operated Welding Wire Feeder

    NASA Technical Reports Server (NTRS)

    Rybicki, Daniel J. (Inventor)

    2001-01-01

    A manual welding wire feeder apparatus comprising a bendable elongate metal frame with a feed roller mounted at the center thereof for rotation about an axis transverse to the longitudinal axis of the frame. The frame ends are turned up as tabs and each provided with openings in alignment with each other and the mid-width center of the roller surface. The tab openings are sized to accommodate welding wire and each extends to a side edge of the tab, both opening on the same side of the frame, whereby welding wire can be side-loaded onto the frame. On the side of the frame, opposite the roller a lock ring handle is attached tangentially and is rotatable about the attachment point and an axis perpendicular to the frame. The device is grasped in the hand normally used to hold the wire. A finger is placed through the loop ring and the frame positioned across the palm and lower fingers. The thumb is positioned atop the wire so it can be moved from the back of the frame across the roller, and towards the front. In doing so, the wire is advanced at a steady rate in axial alignment with the tab openings and roller. To accommodate different wire diameters the frame is bendable about its center in the plane of the frame axis and wire so as to keep the wire in sufficient tension against the roller and to keep the wire fixed when the frame is tilted and thumb pressure released.

  18. Current Concepts in the Evaluation and Treatment of the Shoulder in Overhead Throwing Athletes, Part 2

    PubMed Central

    Reinold, Michael M.; Gill, Thomas J.; Wilk, Kevin E.; Andrews, James R.

    2010-01-01

    The overhead throwing athlete is an extremely challenging patient in sports medicine. The repetitive microtraumatic stresses imposed on the athlete’s shoulder joint complex during the throwing motion constantly place the athlete at risk for injury. Treatment of the overhead athlete requires the understanding of several principles based on the unique physical characteristics of the overhead athlete and the demands endured during the act of throwing. These principles are described and incorporated in a multiphase progressive rehabilitation program designed to prevent injuries and rehabilitate the injured athlete, both nonoperatively and postoperatively. PMID:23015928

  19. Metering Wheel-Wire Track Wire Boom Deployment Mechanism

    NASA Technical Reports Server (NTRS)

    Granoff, Mark S.

    2014-01-01

    The NASA MMS Spin Plane Double Probe (SDP) Deployer utilizes a helical path, rotating Metering Wheel and a spring loaded Wire "Holding" Track to pay out a "fixed end" 57 meter x 1.5 mm diameter Wire Boom stored between concentric storage cylinders. Unlike rotating spool type storage devices, the storage cylinders remain stationary, and the boom wire is uncoiled along the length of the cylinder via the rotation of the Metering Wheel. This uncoiling action avoids the need for slip-ring contacts since the ends of the wire can remain stationary. Conventional fixed electrical connectors (Micro-D type) are used to terminate to operational electronics.

  20. Predicting ice accretion and alleviating galloping on overhead power lines

    NASA Astrophysics Data System (ADS)

    Lu, Mingliang

    2002-04-01

    Both the static and dynamic effects of an ice storm on an overhead power line are investigated fairly comprehensively in this thesis. To determine the static, extreme ice load as well as the combined ice and wind load, a systematic procedure is established based on extensive freezing rain experiments and a Monte Carlo simulation. On the other hand, a dynamic effect---galloping---is examined quite extensively with the objective of better understanding its behavior. A novel add-on device---the hybrid nutation damper (HND)---is proposed to control galloping. Its effectiveness is assessed numerically by using a modified, 3DOF based, galloping software. The present investigations lead to the following findings. (i) Goodwin's simple theoretical model surprisingly predicts, quite accurately, the temporally changing weight of not only a dry ice growth but also a wet ice growth for a fixed, unheated conductor sample. (ii) The maximum ice loading may vary significantly over a power line's planned lifetime because of the randomness of an ice storm and its characteristics as well as the uncertainty involved in identifying the extreme probability distribution of the ice loading. Consequently, backup protection is presently essential for a power line in an ice prone area. (iii) A conductor's torsional flexibility does not appear to affect the growth of the accreted ice weight but it modifies the ice shape significantly. (iv) Three representative ice shapes (a crescent, D-like and icicle pendant) can initiate galloping so that galloping may occur in any icing condition. (v) A noticeable swingback or twist appears to develop only when their respective natural frequencies coincide with the plunge's natural frequency. (vi) A hydraulic jump is the major source of energy dissipation in a nutation damper. A properly induced rotation can significantly enhance a nutation damper's performance. (vii) A hybrid nutation damper has been demonstrated to be a promising means of alleviating

  1. Review of wire chamber aging

    SciTech Connect

    Va'Vra, J.

    1986-02-01

    This paper makes an overview of the wire chamber aging problems as a function of various chamber design parameters. It emphasizes the chemistry point of view and many examples are drawn from the plasma chemistry field as a guidance for a possible effort in the wire chamber field. The paper emphasizes the necessity of variable tuning, the importance of purity of the wire chamber environment, as well as it provides a practical list of presently known recommendations. In addition, several models of the wire chamber aging are qualitatively discussed. The paper is based on a summary talk given at the Wire Chamber Aging Workshop held at LBL, Berkeley on January 16-17, 1986. Presented also at Wire Chamber Conference, Vienna, February 25-28, 1986. 74 refs., 18 figs., 11 tabs.

  2. Some studies on carrier propagation in overhead transmission lines

    SciTech Connect

    Indulkar, C.S.; Kothari, D.P.; Kumar, P.

    1983-04-01

    The effectiveness of a carrier channel on a power line under various power frequency load conditions is studied. The effect of increase of load current results in an increase of conductor temperature, line length and sag. Therefore, the resistivity of the ACSR conductor material increases and the effective height of the conductor above the earth level decreases. A mathematical model of series-impedance and shunt-admittance which takes into account the above effects is used to evaluate the carrier signal attenuation on a line. Further, for the case of a bundle conductor line, the effect of subconductor deflections on the carrier attenuation has been studied. The effects of earth resistivity and earth wires on the actual carrier attenuation have also been studied.

  3. Detail, cyclops 15ton overhead traveling crane and rails running the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail, cyclops 15-ton overhead traveling crane and rails running the length of the building - Wellton-Mohawk Irrigation System, Pumping Plant No. 1, Bounded by Gila River & Union Pacific Railroad, Wellton, Yuma County, AZ

  4. DETAIL OVERHEAD VIEW OF SECONDARY ORE BIN, CONVEYOR PLATFORM,TRAM TRESTLE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL OVERHEAD VIEW OF SECONDARY ORE BIN, CONVEYOR PLATFORM,TRAM TRESTLE, LOADING PLATFORM, AND BOILER, LOOKING SOUTHEAST. - Keane Wonder Mine, Park Route 4 (Daylight Pass Cutoff), Death Valley Junction, Inyo County, CA

  5. Steel tanks T5 and T4 with overhead pipeline between. Redwood ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Steel tanks T5 and T4 with overhead pipeline between. Redwood tanks seen in background - Hawaii Volcanoes National Park Water Collection System, Hawaii Volcanoes National Park, Volcano, Hawaii County, HI

  6. GENERAL VIEW OF POWERHOUSE (MI100B) OPERATING FLOOR, SHOWING THE OVERHEAD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL VIEW OF POWERHOUSE (MI-100-B) OPERATING FLOOR, SHOWING THE OVERHEAD THRUST BEARINGS AND EXCITERS OF THE PLANT'S THREE GENERATING UNITS. VIEW TO NORTHWEST - Hardy Hydroelectric Plant, 6928 East Thirty-sixth Street, Newaygo, Newaygo County, MI

  7. 15. VIEW OF THE ORIGINAL 10TON OVERHEAD NILES TRAVELING CRANE. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW OF THE ORIGINAL 10-TON OVERHEAD NILES TRAVELING CRANE. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  8. Neural wiring optimization.

    PubMed

    Cherniak, Christopher

    2012-01-01

    Combinatorial network optimization theory concerns minimization of connection costs among interconnected components in systems such as electronic circuits. As an organization principle, similar wiring minimization can be observed at various levels of nervous systems, invertebrate and vertebrate, including primate, from placement of the entire brain in the body down to the subcellular level of neuron arbor geometry. In some cases, the minimization appears either perfect, or as good as can be detected with current methods. One question such best-of-all-possible-brains results raise is, what is the map of such optimization, does it have a distinct neural domain? PMID:22230636

  9. Plated wire memory subsystem

    NASA Technical Reports Server (NTRS)

    Carpenter, K. H.

    1974-01-01

    The design, construction, and test history of a 4096 word by 18 bit random access NDRO Plated Wire Memory for use in conjunction with a spacecraft input/output and central processing unit is reported. A technical and functional description is given along with diagrams illustrating layout and systems operation. Test data is shown on the procedures and results of system level and memory stack testing, and hybrid circuit screening. A comparison of the most significant physical and performance characteristics of the memory unit versus the specified requirements is also included.

  10. Texture development in Galfenol wire

    NASA Astrophysics Data System (ADS)

    Boesenberg, A. J.; Restorff, J. B.; Wun-Fogle, M.; Sailsbury, H.; Summers, E.

    2013-05-01

    Galfenol (Fe-Ga alloy) wire fabrication provides a low cost alternative to directional solidification methods. This work evaluates the compositional dependence of the wire drawing suitability of Fe-Ga and characterizes the microstructural and magnetic properties of these wires. Wire has been produced with Ga contents between 10 at. % and 17 at. % to allow determination of the ductile to brittle transition (DTBT) in wire manufacture. Published results on chill cast bend specimens indicated that a DTBT occurs at roughly 15 at. % Ga. This DTBT was observed under tensile loading with a corresponding change in fracture behavior from transverse fracture to intergranular fracture. For improved magnetostrictive performance, higher Ga contents are desired, closer to the 17 at. % Ga evaluated in this work. Electron backscattered diffraction B-H loop and resonance measurements as a function of magnetic field (to determine modulus and coupling factor) are presented for as-drawn, furnace, and direct current (DC) annealed wire. Galfenol wire produced via traditional drawing methods is found to have a strong <110> (α) texture parallel to the drawing direction. As-drawn wire was observed to have a lower magnetic permeability and larger hysteresis than DC annealed wire. This is attributed to the presence of a large volume of crystalline defects; such as vacancies and dislocations.

  11. Corrosion resistance of premodeled wires made of stainless steel used for heart electrotherapy leaders

    NASA Astrophysics Data System (ADS)

    Przondziono, J.; Walke, W.; Młynarski, R.; Szatka, W.

    2012-05-01

    The purpose of the study is to evaluate resistance to electrochemical corrosion of wire made of X10CrNi18-8 stainless steel designed for use in cardiology treatment. The influence of strain formed in the premodeling process and methods of wire surface preparation to corrosive resistance in artificial plasma solution were analysed. Wire corrosion tests were carried out in the solution of artificial plasma. Resistance to electrochemical corrosion was evaluated on the ground of recorded curves of anodic polarization by means of potentiodynamic method. Potentiodynamic tests carried out enabled to determine how the resistance to pitting corrosion of wire changes, depending on strain formed in the premodeling process as well as on the method of wire surface preparation. For evaluation of phenomena occurring on the surface of tested steel, electrochemical impedance spectroscopy (EIS) was applied. Deterioration of corrosive properties of wire along with the increase in the formed strain hardening was observed.

  12. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING... wire; splice in underground wire. Insulated wire shall be protected from mechanical injury....

  13. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING... wire; splice in underground wire. Insulated wire shall be protected from mechanical injury....

  14. 49 CFR 234.241 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... underground wire. 234.241 Section 234.241 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY... of insulated wire; splice in underground wire. Insulated wire shall be protected from...

  15. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING... wire; splice in underground wire. Insulated wire shall be protected from mechanical injury....

  16. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING... wire; splice in underground wire. Insulated wire shall be protected from mechanical injury....

  17. 49 CFR 234.241 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... underground wire. 234.241 Section 234.241 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY... of insulated wire; splice in underground wire. Insulated wire shall be protected from...

  18. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING... wire; splice in underground wire. Insulated wire shall be protected from mechanical injury....

  19. Area overhead analysis of SEF: A design methodology for tolerating SEU

    SciTech Connect

    Blaquiere, Y.; Savaria, Y.

    1987-12-01

    Soft-Error filtering (SEF) is a design methodology proposed recently for implementing machines tolerant to SEU. This paper deals mainly with the evaluation and the reduction of the area overhead brought by SEF. A new shift register filtering latch configuration is proposed. The use of this latch, optimized for minimum area, reduces the area overhead by a factor of 2.6, when compared with latches optimized for time performance. A detailed analysis of the area overhead with SEF implemented on two relatively complex machines produced the following results: a SEF version of the 6800 microprocessor would require an area overhead varying between 12% and 69% depending on the SEF latch used and, a SEF version of the RISCII microprocessor would result in a 38.8% area overhead. An analysis of the cost of implementing the Hamming error correcting code on a register array is presented and this cost is compared with that of implementing SEU tolerance directly with SEF. Finally, a hybrid approach is proposed where a large register array is protected by an error correcting code whereas the isolated latches are replaced by filtering latches. This hybrid approach reduces the area overhead to 18.8% for the RISCII architecture.

  20. Two-Wire to Four-Wire Audio Converter

    NASA Technical Reports Server (NTRS)

    Talley, G. L., Jr; Seale, B. L.

    1983-01-01

    Simple circuit provides interface between normally incompatible voicecommunication lines. Circuit maintains 40 dB of isolation between input and output halves of four-wire line permitting two-wire line to be connected. Balancing potentiometer, Rg, adjusts gain of IC2 to null feed through from input to output. Adjustment is done on workbench just after assembly.

  1. Soft magnetic wires

    NASA Astrophysics Data System (ADS)

    Vázquez, M.

    2001-06-01

    An overview of the present state of the art on the preparation techniques, outstanding magnetic properties and applications of soft magnetic micro and nanowires is presented. Rapid solidification techniques (in-rotating-water quenching and drawing methods) to fabricate amorphous microwires with diameter in the range from 100 down to 1 μm are first described. Electrodeposition is also employed to prepare composite microtubes (magnetic coatings) and to fill porous membranes (diameter of the order of 0.1 μm). Magnetic behaviours of interest are related to the different hysteresis loops of samples: square-shaped loops typical of bistable behaviour, and nearly non-hysteretic loop with well-defined transverse anisotropy field. The role played by magnetic dipolar interactions in the magnetic behaviour of arrays of micro and nanowires is described. A particular analysis is done on the giant magnetoimpedance (GMI) effect in the radio and microwave frequency ranges exhibited by ultrasoft microwires. Finally, a few examples of applications are introduced for magnetostrictive and non-magnetostrictive wires, they are: “magnetoelastic pens”, micromotors; DC current-sensors based on GMI, and sharpened amorphous wire tips in spin polarised scanning tunneling microscopy.

  2. Improved superconducting magnet wire

    DOEpatents

    Schuller, I.K.; Ketterson, J.B.

    1983-08-16

    This invention is directed to a superconducting tape or wire composed of alternating layers of copper and a niobium-containing superconductor such as niobium of NbTi, Nb/sub 3/Sn or Nb/sub 3/Ge. In general, each layer of the niobium-containing superconductor has a thickness in the range of about 0.05 to 1.5 times its coherence length (which for Nb/sub 3/Si is 41 A) with each copper layer having a thickness in the range of about 170 to 600 A. With the use of very thin layers of the niobium composition having a thickness within the desired range, the critical field (H/sub c/) may be increased by factors of 2 to 4. Also, the thin layers of the superconductor permit the resulting tape or wire to exhibit suitable ductility for winding on a magnet core. These compositions are also characterized by relatively high values of critical temperature and therefore will exhibit a combination of useful properties as superconductors.

  3. Adaptations of the Shoulder to Overhead Throwing in Youth Athletes

    PubMed Central

    Astolfi, Matthew Michael; Struminger, Aaron H.; Royer, Todd D.; Kaminski, Thomas W.; Swanik,, Charles B.

    2015-01-01

    Context The high number of repetitions and high forces associated with overhead throwing lead to anatomical adaptations, such as humeral retrotorsion and posterior-capsule thickness, in elite and professional baseball athletes. However, little is known about the origin and progression of these changes that may account for the increasing trend of chronic shoulder injuries in youth baseball and precipitate subsequent pathologic conditions throughout a young athlete's lifetime. Objective To investigate the relationship of age and upper extremity dominance on humeral retrotorsion, posterior-capsule thickness, and glenohumeral range of motion. Design Cross-sectional study. Setting Research laboratory, local baseball fields, and training facilities. Patients or Other Participants Thirty-six boys (mean age = 10.94 ± 1.34 years, height = 151.31 ± 12.17 cm, mass = 42.51 ± 10.32 kg) ranging in age from 8 to 12 years and involved in organized youth baseball. Main Outcome Measure(s) Diagnostic ultrasound was used to determine humeral retrotorsion and posterior-capsule thickness. Glenohumeral internal rotation and external rotation were measured using a handheld inclinometer. We used 2 × 2 mixed-model analyses of variance to compare the influence of limb dominance and age on the dependent variables of humeral retrotorsion, posterior-capsule thickness, internal rotation, and external rotation. Results The dominant shoulders of youth throwers exhibited less glenohumeral internal rotation but greater humeral retrotorsion, posterior-capsule thickness, and glenohumeral external rotation than the nondominant shoulders. Dominant internal rotation was greater in the 8- to 10-year-old group than in the 11- to 12-year-old group, and results trended toward a difference (F1,33 = 4.12, P = .05). Correlations existed between humeral retrotorsion and range of motion (P < .05). Conclusions The structural adaptations in the dominant shoulders of younger baseball players were similar to

  4. The Current in a Wire

    ERIC Educational Resources Information Center

    Thompson, Keith

    2009-01-01

    This little problem arose because I was frustrated with the standard electromagnetism texts, which show the magnetic field due to a current-bearing wire outside the wire [proportional to] 1/r and inside [proportional to] r. However, they never point out that the moving electrons must be influenced by the magnetic field created by the other moving…

  5. Aircraft wiring program status report

    NASA Technical Reports Server (NTRS)

    Beach, Rex

    1995-01-01

    In this Naval Air Warfare Center (NAWC) Aircraft Division status report, the general and wire and cable component activities, the systems engineering activities, the aircraft wiring lead maintenance activities, the NAVAIR/NASA interface activities, and the Base Realignment and Closure (BRAC) Commission recommendations are presented.

  6. First Wire-Free Pacemaker Approved

    MedlinePlus

    ... Wire-Free Pacemaker Approved Treats irregular heartbeat without wired leads To use the sharing features on this ... said in a news release. In traditional pacemakers, wired leads may malfunction and require the device to ...

  7. Welding wire pressure sensor assembly

    NASA Technical Reports Server (NTRS)

    Morris, Timothy B. (Inventor); Milly, Peter F., Sr. (Inventor); White, J. Kevin (Inventor)

    1994-01-01

    The present invention relates to a device which is used to monitor the position of a filler wire relative to a base material being welded as the filler wire is added to a welding pool. The device is applicable to automated welding systems wherein nonconsumable electrode arc welding processes are utilized in conjunction with a filler wire which is added to a weld pool created by the electrode arc. The invention senses pressure deviations from a predetermined pressure between the filler wire and the base material, and provides electrical signals responsive to the deviations for actuating control mechanisms in an automatic welding apparatus so as to minimize the pressure deviation and to prevent disengagement of the contact between the filler wire and the base material.

  8. Welding wire pressure sensor assembly

    NASA Astrophysics Data System (ADS)

    Morris, Timothy B.; Milly, Peter F.; White, J. Kevin

    1993-05-01

    The present invention relates to a device which is used to monitor the position of a filler wire relative to a base material being welded as the filler wire is added to a welding pool. The device is applicable to automated welding systems wherein nonconsumable electrode arc welding processes are utilized in conjunction with a filler wire which is added to a weld pool created by the electrode arc. The invention senses pressure deviations from a predetermined pressure between the filler wire and the base material, and provides electrical signals responsive to the deviations for actuating control mechanisms in an automatic welding apparatus so as to minimize the pressure deviation and to prevent disengagement of the contact between the filler wire and the base material.

  9. Welding wire pressure sensor assembly

    NASA Astrophysics Data System (ADS)

    Morris, Timothy B.; Milly, Peter F., Sr.; White, J. Kevin

    1994-04-01

    The present invention relates to a device which is used to monitor the position of a filler wire relative to a base material being welded as the filler wire is added to a welding pool. The device is applicable to automated welding systems wherein nonconsumable electrode arc welding processes are utilized in conjunction with a filler wire which is added to a weld pool created by the electrode arc. The invention senses pressure deviations from a predetermined pressure between the filler wire and the base material, and provides electrical signals responsive to the deviations for actuating control mechanisms in an automatic welding apparatus so as to minimize the pressure deviation and to prevent disengagement of the contact between the filler wire and the base material.

  10. Apollo experience report: Electrical wiring subsystem

    NASA Technical Reports Server (NTRS)

    White, L. D.

    1975-01-01

    The general requirements of the electrical wiring subsystems and the problem areas and solutions that occurred during the major part of the Apollo Program are detailed in this report. The concepts and definitions of specific requirements for electrical wiring; wire-connecting devices; and wire-harness fabrication, checkout, and installation techniques are discussed. The design and development of electrical wiring and wire-connecting devices are described. Mission performance is discussed, and conclusions and recommendations for future programs are presented.

  11. Electrode carrying wire for GTAW welding

    NASA Technical Reports Server (NTRS)

    Morgan, Gene E. (Inventor); Dyer, Gerald E. (Inventor)

    1990-01-01

    A welding torch for gas tungsten arc welding apparatus has a hollow tungsten electrode including a ceramic liner and forms the filler metal wire guide. The wire is fed through the tungsten electrode thereby reducing the size of the torch to eliminate clearance problems which exist with external wire guides. Since the wire is preheated from the tungsten more wire may be fed into the weld puddle, and the wire will not oxidize because it is always within the shielding gas.

  12. Internal wire guide for GTAW welding

    NASA Technical Reports Server (NTRS)

    Morgan, Gene E. (Inventor); Dyer, Gerald E. (Inventor)

    1989-01-01

    A welding torch for gas tungsten arc welding apparatus has a filler metal wire guide positioned within the torch, and within the shielding gas nozzle. The wire guide is adjacent to the tungsten electrode and has a ceramic liner through which the wire is fed. This reduces the size of the torch and eliminates the outside clearance problems that exit with external wire guides. Additionally, since the wire is always within the shielding gas, oxidizing of the wire is eliminated.

  13. Sintered wire cathode

    DOEpatents

    Falce, Louis R.; Ives, R. Lawrence

    2009-06-09

    A porous cathode structure is fabricated from a plurality of wires which are placed in proximity to each other in elevated temperature and pressure for a sintering time. The sintering process produces the porous cathode structure which may be divided into a plurality of individual porous cathodes, one of which may be placed into a dispenser cathode support which includes a cavity for containing a work function reduction material such as BaO, CaO, and Al.sub.2O.sub.3. The work function reduction material migrates through the pores of the porous cathode from a work replenishment surface adjacent to the cavity of the dispenser cathode support to an emitting cathode surface, thereby providing a dispenser cathode which has a uniform work function and therefore a uniform electron emission.

  14. CCD Photometry of bright stars using objective wire mesh

    SciTech Connect

    Kamiński, Krzysztof; Zgórz, Marika; Schwarzenberg-Czerny, Aleksander

    2014-06-01

    Obtaining accurate photometry of bright stars from the ground remains problematic due to the danger of overexposing the target and/or the lack of suitable nearby comparison stars. The century-old method of using objective wire mesh to produce multiple stellar images seems promising for the precise CCD photometry of such stars. Furthermore, our tests on β Cep and its comparison star, differing by 5 mag, are very encouraging. Using a CCD camera and a 20 cm telescope with the objective covered by a plastic wire mesh, in poor weather conditions, we obtained differential photometry with a precision of 4.5 mmag per two minute exposure. Our technique is flexible and may be tuned to cover a range as big as 6-8 mag. We discuss the possibility of installing a wire mesh directly in the filter wheel.

  15. Wire Electrical Discharge Truing of Metal Bond Diamond Grinding Wheels

    SciTech Connect

    McSpadden, SB

    2002-01-24

    Cylindrical wire EDM profile truing of the metal bond diamond wheel for precision form grinding of ceramics is presented in this report. First a corrosion-resistant, precise spindle with the high-electrical current capability for wire EDM truing of grinding wheel was fabricated. An arc profile was adopted in order to determine form tolerances capabilities of this process. Results show the wire EDM process can generate {micro}m-scale precision form on the diamond wheel efficiently. The wheel, after truing, was used to grind silicon nitride. Grinding forces, surface finish of ground components, and wheel wear were measured. The EDM trued wheel showed a reduction in grinding force from that of the stick dressed wheel. Surface finishes between the two truing methods were similar. In the beginning of the grinding, significant wheel wear rate was identified. The subsequent wheel wear rate stabilized and became considerably lower.

  16. CCD Photometry of Bright Stars Using Objective Wire Mesh

    NASA Astrophysics Data System (ADS)

    Kamiński, Krzysztof; Schwarzenberg-Czerny, Aleksander; Zgórz, Marika

    2014-06-01

    Obtaining accurate photometry of bright stars from the ground remains problematic due to the danger of overexposing the target and/or the lack of suitable nearby comparison stars. The century-old method of using objective wire mesh to produce multiple stellar images seems promising for the precise CCD photometry of such stars. Furthermore, our tests on β Cep and its comparison star, differing by 5 mag, are very encouraging. Using a CCD camera and a 20 cm telescope with the objective covered by a plastic wire mesh, in poor weather conditions, we obtained differential photometry with a precision of 4.5 mmag per two minute exposure. Our technique is flexible and may be tuned to cover a range as big as 6-8 mag. We discuss the possibility of installing a wire mesh directly in the filter wheel.

  17. Plasma chemistry in wire chambers

    SciTech Connect

    Wise, J.

    1990-05-01

    The phenomenology of wire chamber aging is discussed and fundamentals of proportional counters are presented. Free-radical polymerization and plasma polymerization are discussed. The chemistry of wire aging is reviewed. Similarities between wire chamber plasma (>1 atm dc-discharge) and low-pressure rf-discharge plasmas, which have been more widely studied, are suggested. Construction and use of a system to allow study of the plasma reactions occurring in wire chambers is reported. A proportional tube irradiated by an {sup 55}Fe source is used as a model wire chamber. Condensable species in the proportional tube effluent are concentrated in a cryotrap and analyzed by gas chromatography/mass spectrometry. Several different wire chamber gases (methane, argon/methane, ethane, argon/ethane, propane, argon/isobutane) are tested and their reaction products qualitatively identified. For all gases tested except those containing methane, use of hygroscopic filters to remove trace water and oxygen contaminants from the gas resulted in an increase in the average molecular weight of the products, consistent with results from low-pressure rf-discharge plasmas. It is suggested that because water and oxygen inhibit polymer growth in the gas phase that they may also reduce polymer deposition in proportional tubes and therefore retard wire aging processes. Mechanistic implications of the plasma reactions of hydrocarbons with oxygen are suggested. Unresolved issues in this work and proposals for further study are discussed.

  18. Overhead drilling: Comparing three bases for aligning a drilling jig to vertical

    PubMed Central

    Rempel, David; Star, Demetra; Barr, Alan; Janowitz, Ira

    2010-01-01

    Problem Drilling overhead into concrete or metal ceilings is a strenuous task done by construction workers to hang ductwork, piping, and electrical equipment. The task is associated with upper body pain and musculoskeletal disorders. Previously, we described a field usability evaluation of a foot lever and inverted drill press intervention devices that were compared to the usual method for overhead drilling. Both interventions were rated as inferior to the usual method based on poor setup time and mobility. Method Three new interventions, which differed on the design used for aligning the drilling column to vertical, were compared to the usual method for overhead drilling by commercial construction workers (n=16). Results The usual method was associated with the highest levels of regional body fatigue and the poorest usability ratings when compared to the three interventions. Conclusion Overall, the ‘Collar Base’ intervention design received the best usability ratings. Impact on Industry Intervention designs developed for overhead drilling may reduce shoulder fatigue and prevent subsequent musculoskeletal disorders. These designs may also be useful for other overhead work such as lifting and supporting materials (e.g., piping, ducts) that are installed near the ceiling. Workplace health and safety interventions may require multiple rounds of field-testing prior to achieving acceptable usability ratings by the end users. PMID:20630276

  19. Effects of overhead work configuration on muscle activity during a simulated drilling task.

    PubMed

    Maciukiewicz, Jacquelyn M; Cudlip, Alan C; Chopp-Hurley, Jaclyn N; Dickerson, Clark R

    2016-03-01

    Overhead work is a known catalyst for occupational shoulder injury. Industrial workers must often adopt awkward overhead postures and loading profiles to complete required tasks, potentially elevating injury risk. This research examined the combined influence of multiple overhead working parameters on upper extremity muscular demands for an industrial drilling application. Twenty-two right-handed males completed 24 unilateral and bilateral overhead work exertions stratified by direction (upward, forward), point of force application (15, 30 and 45 cm in front of the body), and whole-body posture (seated, standing). The dependency of electromyographic (EMG) activity on several factors was established. Significant two-way interactions existed between point of force application and direction (p < 0.0001) and direction and whole body posture (p < 0.0001). An average increase in muscular activity of 6.5% maximal voluntary contraction (MVC) occurred for the contralateral limb when the bilateral task was completed, compared to unilateral tasks, with less than a 1% MVC increase for the active limb. These findings assist evidence-based approaches to overhead tasks, specifically in the construction industry. A bilateral task configuration is recommended to reduce glenohumeral stability demands. As well, particularly for tasks with a far reach distance, design tasks to promote a forward directed exertion. The considerable inter-subject variability suggests that fixed heights are not ideal, and should be avoided, and where this is not possible reaches should be reduced. PMID:26674399

  20. 30 CFR 57.12069 - Lightning protection for telephone wires and ungrounded conductors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ungrounded conductors. 57.12069 Section 57.12069 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... ungrounded conductors. Each ungrounded conductor or telephone wire that leads underground and is directly... resistance grounding medium on the surface and shall be separated from neutral grounds by a distance of...

  1. 30 CFR 57.12069 - Lightning protection for telephone wires and ungrounded conductors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ungrounded conductors. 57.12069 Section 57.12069 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... ungrounded conductors. Each ungrounded conductor or telephone wire that leads underground and is directly... resistance grounding medium on the surface and shall be separated from neutral grounds by a distance of...

  2. 30 CFR 57.12069 - Lightning protection for telephone wires and ungrounded conductors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ungrounded conductors. 57.12069 Section 57.12069 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... ungrounded conductors. Each ungrounded conductor or telephone wire that leads underground and is directly... resistance grounding medium on the surface and shall be separated from neutral grounds by a distance of...

  3. 30 CFR 57.12069 - Lightning protection for telephone wires and ungrounded conductors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ungrounded conductors. 57.12069 Section 57.12069 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... ungrounded conductors. Each ungrounded conductor or telephone wire that leads underground and is directly... resistance grounding medium on the surface and shall be separated from neutral grounds by a distance of...

  4. 30 CFR 57.12069 - Lightning protection for telephone wires and ungrounded conductors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ungrounded conductors. 57.12069 Section 57.12069 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... ungrounded conductors. Each ungrounded conductor or telephone wire that leads underground and is directly... resistance grounding medium on the surface and shall be separated from neutral grounds by a distance of...

  5. Requirements for printed wiring boards

    NASA Technical Reports Server (NTRS)

    1984-01-01

    In order to maintain the high standards of the NASA printed wiring programs, this publication: prescribes NASA's requirements for assuring reliable rigid printed wiring boards; describes and incorporates basic considerations necessary to assure reliable rigid printed wiring boards; establishes the supplier's responsibility to train and certify personnel; provides for supplier documentation of the fabrication and inspection procedures to be used for NASA work, including supplier innovations and changes in technology; and provides visual workmanship standards to aid those responsible for determining quality conformance to the established requirements.

  6. Operational environments for electrical power wiring on NASA space systems

    NASA Technical Reports Server (NTRS)

    Stavnes, Mark W.; Hammoud, Ahmad N.; Bercaw, Robert W.

    1994-01-01

    Electrical wiring systems are used extensively on NASA space systems for power management and distribution, control and command, and data transmission. The reliability of these systems when exposed to the harsh environments of space is very critical to mission success and crew safety. Failures have been reported both on the ground and in flight due to arc tracking in the wiring harnesses, made possible by insulation degradation. This report was written as part of a NASA Office of Safety and Mission Assurance (Code Q) program to identify and characterize wiring systems in terms of their potential use in aerospace vehicles. The goal of the program is to provide the information and guidance needed to develop and qualify reliable, safe, lightweight wiring systems, which are resistant to arc tracking and suitable for use in space power applications. This report identifies the environments in which NASA spacecraft will operate, and determines the specific NASA testing requirements. A summary of related test programs is also given in this report. This data will be valuable to spacecraft designers in determining the best wiring constructions for the various NASA applications.

  7. 7 CFR 1755.406 - Shield or armor ground resistance measurements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... plant and fiber optic cable plant. (b) Method of measurement. (1) The shield or armor ground resistance measurement shall be made between the copper cable and wire shield and ground and between the fiber optic... instructions. (d) Applicable results. (1) For all new copper cable and wire facilities and all new fiber...

  8. 7 CFR 1755.406 - Shield or armor ground resistance measurements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... plant and fiber optic cable plant. (b) Method of measurement. (1) The shield or armor ground resistance measurement shall be made between the copper cable and wire shield and ground and between the fiber optic... instructions. (d) Applicable results. (1) For all new copper cable and wire facilities and all new fiber...

  9. 7 CFR 1755.406 - Shield or armor ground resistance measurements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... plant and fiber optic cable plant. (b) Method of measurement. (1) The shield or armor ground resistance measurement shall be made between the copper cable and wire shield and ground and between the fiber optic... instructions. (d) Applicable results. (1) For all new copper cable and wire facilities and all new fiber...

  10. 7 CFR 1755.406 - Shield or armor ground resistance measurements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... plant and fiber optic cable plant. (b) Method of measurement. (1) The shield or armor ground resistance measurement shall be made between the copper cable and wire shield and ground and between the fiber optic... instructions. (d) Applicable results. (1) For all new copper cable and wire facilities and all new fiber...

  11. Lazy Checkpointing : Exploiting Temporal Locality in Failures to Mitigate Checkpointing Overheads on Extreme-Scale Systems

    SciTech Connect

    Tiwari, Devesh; Gupta, Saurabh; Vazhkudai, Sudharshan S

    2014-01-01

    Continuing increase in the computational power of supercomputers has enabled large-scale scientific applications in the areas of astrophysics, fusion, climate and combustion to run larger and longer-running simulations, facilitating deeper scientific insights. However, these long-running simulations are often interrupted by multiple system failures. Therefore, these applications rely on ``checkpointing'' as a resilience mechanism to store application state to permanent storage and recover from failures. \\\\ \\indent Unfortunately, checkpointing incurs excessive I/O overhead on supercomputers due to large size of checkpoints, resulting in a sub-optimal performance and resource utilization. In this paper, we devise novel mechanisms to show how checkpointing overhead can be mitigated significantly by exploiting the temporal characteristics of system failures. We provide new insights and detailed quantitative understanding of the checkpointing overheads and trade-offs on large-scale machines. Our prototype implementation shows the viability of our approach on extreme-scale machines.

  12. Communication overhead on the Intel Paragon, IBM SP2 and Meiko CS-2

    NASA Technical Reports Server (NTRS)

    Bokhari, Shahid H.

    1995-01-01

    Interprocessor communication overhead is a crucial measure of the power of parallel computing systems-its impact can severely limit the performance of parallel programs. This report presents measurements of communication overhead on three contemporary commercial multicomputer systems: the Intel Paragon, the IBM SP2 and the Meiko CS-2. In each case the time to communicate between processors is presented as a function of message length. The time for global synchronization and memory access is discussed. The performance of these machines in emulating hypercubes and executing random pairwise exchanges is also investigated. It is shown that the interprocessor communication time depends heavily on the specific communication pattern required. These observations contradict the commonly held belief that communication overhead on contemporary machines is independent of the placement of tasks on processors. The information presented in this report permits the evaluation of the efficiency of parallel algorithm implementations against standard baselines.

  13. A Testing Platform for Validation of Overhead Conductor Aging Models and Understanding Thermal Limits

    SciTech Connect

    Irminger, Philip; Starke, Michael R; Dimitrovski, Aleksandar D; Young II, Marcus Aaron; Rizy, D Tom; Stovall, John P; Overholt, Philip N

    2014-01-01

    Power system equipment manufacturers and researchers continue to experiment with novel overhead electric conductor designs that support better conductor performance and address congestion issues. To address the technology gap in testing these novel designs, Oak Ridge National Laboratory constructed the Powerline Conductor Accelerated Testing (PCAT) facility to evaluate the performance of novel overhead conductors in an accelerated fashion in a field environment. Additionally, PCAT has the capability to test advanced sensors and measurement methods for accessing overhead conductor performance and condition. Equipped with extensive measurement and monitoring devices, PCAT provides a platform to improve/validate conductor computer models and assess the performance of novel conductors. The PCAT facility and its testing capabilities are described in this paper.

  14. Nitrate leaching beneath a containerized nursery crop receiving trickle or overhead irrigation.

    PubMed

    Colangelo, D J; Brand, M H

    2001-01-01

    Container production of nursery crops is intensive and a potential source of nitrogen release to the environment. This study was conducted to determine if trickle irrigation could be used by container nursery producers as an alternative to standard overhead irrigation to reduce nitrogen release into the environment. The effect of overhead irrigation and trickle irrigation on leachate nitrate N concentration, flow-weighted nitrate N concentration, leachate volume, and plant growth was investigated using containerized rhododendron (Rhododendron catawbiense Michx. 'Album') supplied with a controlled-release fertilizer and grown outdoors on top of soil-monolith lysimeters. Leachate was collected over two growing seasons and overwinter periods, and natural precipitation was allowed as a component of the system. Precipitation accounted for 69% of the water entering the overhead-irrigated system and 80% of the water entering the trickle-irrigated system. Leachate from fertilized plants exceeded the USEPA limit of 10 mg L(-1) at several times and reached a maximum of 26 mg L(-1) with trickle irrigation. Average annual loss of nitrate N in leachate for fertilized treatments was 51.8 and 60.5 kg ha(-1) for the overhead and trickle treatments, respectively. Average annual flow-weighted concentration of nitrate N in leachate of fertilized plants was 7.2 mg L(-1) for overhead irrigation and 12.7 mg L(-1) for trickle irrigation. Trickle irrigation did not reduce the amount of nitrate N leached from nursery containers when compared with overhead irrigation because precipitation nullified the potential benefits of reduced leaching fractions and irrigation inputs provided under trickle irrigation. PMID:11577861

  15. Method of manufacturing superconductor wire

    SciTech Connect

    Motowidlo, Leszek

    2014-09-16

    A method for forming Nb.sub.3Sn superconducting wire is provided. The method employs a powder-in-tube process using a high-tin intermetallic compound, such as MnSn.sub.2, for producing the Nb.sub.3Sn. The use of a high-tin intermetallic compound enables the process to perform hot extrusion without melting the high-tin intermetallic compound. Alternatively, the method may entail drawing the wire without hot extrusion.

  16. Smart Wire Grid: Resisting Expectations

    SciTech Connect

    Ramsay, Stewart; Lowe, DeJim

    2014-03-03

    Smart Wire Grid's DSR technology (Discrete Series Reactor) can be quickly deployed on electrical transmission lines to create intelligent mesh networks capable of quickly rerouting electricity to get power where and when it's needed the most. With their recent ARPA-E funding, Smart Wire Grid has been able to move from prototype and field testing to building out a US manufacturing operation in just under a year.

  17. Smart Wire Grid: Resisting Expectations

    ScienceCinema

    Ramsay, Stewart; Lowe, DeJim

    2014-04-09

    Smart Wire Grid's DSR technology (Discrete Series Reactor) can be quickly deployed on electrical transmission lines to create intelligent mesh networks capable of quickly rerouting electricity to get power where and when it's needed the most. With their recent ARPA-E funding, Smart Wire Grid has been able to move from prototype and field testing to building out a US manufacturing operation in just under a year.

  18. Infrared spectral marker bands characterizing a transient water wire inside a hydrophobic membrane protein.

    PubMed

    Wolf, Steffen; Freier, Erik; Cui, Qiang; Gerwert, Klaus

    2014-12-14

    Proton conduction along protein-bound "water wires" is an essential feature in membrane proteins. Here, we analyze in detail a transient water wire, which conducts protons via a hydrophobic barrier within a membrane protein to create a proton gradient. It is formed only for a millisecond out of three water molecules distributed at inactive positions in a polar environment in the ground state. The movement into a hydrophobic environment causes characteristic shifts of the water bands reflecting their different chemical properties. These band shifts are identified by time-resolved Fourier Transform Infrared difference spectroscopy and analyzed by biomolecular Quantum Mechanical/Molecular Mechanical simulations. A non-hydrogen bonded ("dangling") O-H stretching vibration band and a broad continuum absorbance caused by a combined vibration along the water wire are identified as characteristic marker bands of such water wires in a hydrophobic environment. The results provide a basic understanding of water wires in hydrophobic environments. PMID:25494795

  19. Infrared spectral marker bands characterizing a transient water wire inside a hydrophobic membrane protein

    NASA Astrophysics Data System (ADS)

    Wolf, Steffen; Freier, Erik; Cui, Qiang; Gerwert, Klaus

    2014-12-01

    Proton conduction along protein-bound "water wires" is an essential feature in membrane proteins. Here, we analyze in detail a transient water wire, which conducts protons via a hydrophobic barrier within a membrane protein to create a proton gradient. It is formed only for a millisecond out of three water molecules distributed at inactive positions in a polar environment in the ground state. The movement into a hydrophobic environment causes characteristic shifts of the water bands reflecting their different chemical properties. These band shifts are identified by time-resolved Fourier Transform Infrared difference spectroscopy and analyzed by biomolecular Quantum Mechanical/Molecular Mechanical simulations. A non-hydrogen bonded ("dangling") O-H stretching vibration band and a broad continuum absorbance caused by a combined vibration along the water wire are identified as characteristic marker bands of such water wires in a hydrophobic environment. The results provide a basic understanding of water wires in hydrophobic environments.

  20. HTS Wire Development Workshop: Proceedings

    SciTech Connect

    Not Available

    1994-07-01

    The 1994 High-Temperature Superconducting Wire Development Workshop was held on February 16--17 at the St. Petersburg Hilton and Towers in St. Petersburg, Florida. The meeting was hosted by Florida Power Corporation and sponsored by the US Department of Energy`s Superconductivity Program for Electric Power Systems. The meeting focused on recent high-temperature superconducting wire development activities in the Department of Energy`s Superconductivity Systems program. The meeting opened with a general discussion on the needs and benefits of superconductivity from a utility perspective, the US global competitiveness position, and an outlook on the overall prospects of wire development. The meeting then focused on four important technology areas: Wire characterization: issues and needs; technology for overcoming barriers: weak links and flux pinning; manufacturing issues for long wire lengths; and physical properties of HTS coils. Following in-depth presentations, working groups were formed in each technology area to discuss the most important current research and development issues. The working groups identified research areas that have the potential for greatly enhancing the wire development effort. These areas are discussed in the summary reports from each of the working groups. This document is a compilation of the workshop proceedings including all general session presentations and summary reports from the working groups.

  1. 1 mil gold bond wire study.

    SciTech Connect

    Huff, Johnathon; McLean, Michael B.; Jenkins, Mark W.; Rutherford, Brian Milne

    2013-05-01

    In microcircuit fabrication, the diameter and length of a bond wire have been shown to both affect the current versus fusing time ratio of a bond wire as well as the gap length of the fused wire. This study investigated the impact of current level on the time-to-open and gap length of 1 mil by 60 mil gold bond wires. During the experiments, constant current was provided for a control set of bond wires for 250ms, 410ms and until the wire fused; non-destructively pull-tested wires for 250ms; and notched wires. The key findings were that as the current increases, the gap length increases and 73% of the bond wires will fuse at 1.8A, and 100% of the wires fuse at 1.9A within 60ms. Due to the limited scope of experiments and limited data analyzed, further investigation is encouraged to confirm these observations.

  2. Fabrication of Pd-Cr wire

    NASA Technical Reports Server (NTRS)

    Diamond, Sidney; Leach, Dennen M.

    1989-01-01

    Fabrication of Pd-13 percent Cr alloy wires is described. Melting, casting, swaging and annealing processes are discussed. Drawing to reach two diameters (0.003 inch and 0.00176 inch) of wire is described. Representative micrographs of the Pd-Cr alloy at selected stages during wire fabrication are included. The resistance of the wire was somewhat lower, by about 15 to 20 percent, than comparable wire of other alloys used for strain gages.

  3. Experimental Results for Space-Wire-D

    NASA Astrophysics Data System (ADS)

    Parkes, Steve; Gibson, David; Ferrer, Albert

    2015-09-01

    SpaceWire-D is a deterministic extension to SpaceWire that uses time-division multiplexing to schedule traffic within time-slots. It allows a single SpaceWire network to be used for both time-critical avionics control applications and asynchronous payload data-handling simultaneously using existing SpaceWire technology. In this paper we describe the services of SpaceWire-D and present experimental results for each service.

  4. Connecting to Thermocouples with Fewer Lead Wires

    NASA Technical Reports Server (NTRS)

    Goldsby, Jon C.

    2003-01-01

    A simple technique has been devised to reduce the number of lead wires needed to connect an array of thermocouples to the instruments (e.g., voltmeters) used to read their output voltages. Because thermocouple wires are usually made of expensive metal alloys, reducing the number of lead wires can effect a considerable reduction in the cost of such an array. Reducing the number of wires also reduces the number of terminals and the amount of space needed to accommodate the wires.

  5. Improved Method of Locating Defects in Wiring Insulation

    NASA Technical Reports Server (NTRS)

    Greulich, Owen R.

    2004-01-01

    An improved method of locating small breaches in insulation on electrical wires combines aspects of the prior dielectric withstand voltage (DWV) and time-domain reflectometry (TDR) methods. The method was invented to satisfy a need for reliably and quickly locating insulation defects in spacecraft, aircraft, ships, and other complex systems that contain large amounts of wiring, much of it enclosed in structures that make it difficult to inspect. In the DWV method, one applies a predetermined potential (usually 1.5 kV DC) to the wiring and notes whether the voltage causes any arcing between the wiring and ground. The DWV method does not provide an indication of the location of the defect (unless, in an exceptional case, the arc happens to be visible). In addition, if there is no electrically conductive component at ground potential within about 0.010 in. (approximately equal to 0.254 mm) of the wire at the location of an insulation defect, then the DWV method does not provide an indication of the defect. Moreover, one does not have the option to raise the potential in an effort to increase the detectability of such a defect because doing so can harm previously undamaged insulation. In the TDR method as practiced heretofore, one applies a pulse of electricity having an amplitude of less than 25 V to a wire and measures the round-trip travel time for the reflection of the pulse from a defect. The distance along the wire from the point of application of the pulse to the defect is then calculated as the product of half the round-trip travel time and the characteristic speed of a propagation of an electromagnetic signal in the wire. While the TDR method as practiced heretofore can be used to locate a short or open circuit, it does not ordinarily enable one to locate a small breach in insulation because the pulse voltage is too low to cause arcing and thus too low to induce an impedance discontinuity large enough to generate a measurable reflection. The present improved

  6. Terahertz radiation from a wire target irradiated by an ultra-intense laser pulse

    SciTech Connect

    Li Zhichao; Zheng Jian

    2007-05-15

    When an ultra-intense laser pulse impacts the tip of a wire whose other end is grounded, a strong return current can be driven along the wire because some energetic electrons generated in ultra-intense laser matter interaction can escape from the target and an electric field builds up. The wire then behaves like a current-carrying antenna that can emit electromagnetic radiations. If the duration of the driving pulse is several tens of femtoseconds, the radiation spectrum reaches a maximum at terahertz region, and the radiation power per solid angle could be as high as 10{sup 9} W/rad.

  7. Marangoni Flowers and the Evil Eye: Overhead Presentations of Marangoni Flow

    ERIC Educational Resources Information Center

    Mundell, Donald W.

    2009-01-01

    Intermolecular forces and surface tension gradients in solutions lead to remarkable flows, known as Marangoni flows, where liquid flows from a region of low surface tension towards higher surface tension. Details of these flows, not visible to the naked eye, are made visible on an overhead projector owing to variation in the index of refraction.…

  8. 48 CFR 3452.216-71 - Negotiated overhead rates-fixed.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... bases agreed upon by the parties, as specified below. A negotiated fixed rate(s) is based on an estimate of the costs which will be incurred during the period for which the rate(s) applies. If the... cognizant audit activity, a proposed fixed overhead rate or rates based on the contractor's actual...

  9. How To Set Up Your Own Small Business. Volumes I-II and Overhead Transparencies.

    ERIC Educational Resources Information Center

    Fallek, Max

    This two-volume textbook and collection of overhead transparency masters is intended for use in a course in setting up a small business. The following topics are covered in the first volume: getting off to a good start, doing market research, forecasting sales, financing a small business, understanding the different legal needs of different types…

  10. 49 CFR 214.515 - Overhead covers for existing on-track roadway maintenance machines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... maintenance machines. 214.515 Section 214.515 Transportation Other Regulations Relating to Transportation... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.515 Overhead covers for existing on-track roadway maintenance machines. (a) For those existing on-track roadway maintenance machines either currently...

  11. 49 CFR 214.515 - Overhead covers for existing on-track roadway maintenance machines.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... maintenance machines. 214.515 Section 214.515 Transportation Other Regulations Relating to Transportation... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.515 Overhead covers for existing on-track roadway maintenance machines. (a) For those existing on-track roadway maintenance machines either currently...

  12. 49 CFR 214.515 - Overhead covers for existing on-track roadway maintenance machines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintenance machines. 214.515 Section 214.515 Transportation Other Regulations Relating to Transportation... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.515 Overhead covers for existing on-track roadway maintenance machines. (a) For those existing on-track roadway maintenance machines either currently...

  13. 49 CFR 214.515 - Overhead covers for existing on-track roadway maintenance machines.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... maintenance machines. 214.515 Section 214.515 Transportation Other Regulations Relating to Transportation... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.515 Overhead covers for existing on-track roadway maintenance machines. (a) For those existing on-track roadway maintenance machines either currently...

  14. 49 CFR 214.515 - Overhead covers for existing on-track roadway maintenance machines.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... maintenance machines. 214.515 Section 214.515 Transportation Other Regulations Relating to Transportation... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.515 Overhead covers for existing on-track roadway maintenance machines. (a) For those existing on-track roadway maintenance machines either currently...

  15. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....16015 Section 57.16015 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL... shall work from or travel on the bridge of an overhead crane unless the bridge is provided...

  16. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....16015 Section 57.16015 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL... shall work from or travel on the bridge of an overhead crane unless the bridge is provided...

  17. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....16015 Section 56.16015 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES... from or travel on the bridge of an overhead crane unless the bridge is provided with...

  18. 33 CFR 165.T09-0971 - Safety zone; overhead cable replacement, Maumee River, Toledo, OH.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CFR 165.7(a). Such means of notification may also include, but are not limited to Broadcast Notice to... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Safety zone; overhead cable... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PORTS AND WATERWAYS SAFETY REGULATED NAVIGATION...

  19. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....16015 Section 57.16015 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL... shall work from or travel on the bridge of an overhead crane unless the bridge is provided...

  20. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Work or travel on overhead crane bridges. 56.16015 Section 56.16015 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Materials Storage and Handling § 56.16015 Work...

  1. 33 CFR 165.T09-0971 - Safety zone; overhead cable replacement, Maumee River, Toledo, OH.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Safety zone; overhead cable replacement, Maumee River, Toledo, OH. 165.T09-0971 Section 165.T09-0971 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PORTS AND WATERWAYS SAFETY REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS...

  2. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Work or travel on overhead crane bridges. 56.16015 Section 56.16015 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Materials Storage and Handling § 56.16015 Work...

  3. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Work or travel on overhead crane bridges. 57.16015 Section 57.16015 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Materials Storage and Handling §...

  4. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....16015 Section 56.16015 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES... from or travel on the bridge of an overhead crane unless the bridge is provided with...

  5. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....16015 Section 56.16015 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES... from or travel on the bridge of an overhead crane unless the bridge is provided with...

  6. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Work or travel on overhead crane bridges. 57.16015 Section 57.16015 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Materials Storage and Handling §...

  7. 77 FR 71697 - Safety Zone; Overhead Cable Replacement, Maumee River, Toledo, OH

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... Security FR Federal Register NPRM Notice of Proposed Rulemaking A. Regulatory History and Information On... SECURITY Coast Guard 33 CFR Part 165 RIN 1625-AA08 Safety Zone; Overhead Cable Replacement, Maumee River... Cable Replacement, Maumee River, Toledo, OH (docket number USCG-2012-0948) in support of the...

  8. Using the Overhead Projector as a Light Source for Physics Demonstrations

    ERIC Educational Resources Information Center

    Mak, Se-Yuen

    2006-01-01

    This article illustrates how the overhead projector can be used as a light source in some peculiar ways for physics demonstrations. Five examples are included: (1) Study of chromatic aberration; (2) Making giant Newton's rings; (3) Comparison of the rate of heat absorption by different surfaces; (4) Demonstration of greenhouse effect; and (5)…

  9. DETAIL OVERHEAD VIEW OF SECONDARY ORE BIN. CONVEYOR PLATFORM,TRAM TRESTLE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL OVERHEAD VIEW OF SECONDARY ORE BIN. CONVEYOR PLATFORM,TRAM TRESTLE, AND LOADING PLATFORM. LOOKING SOUTHWEST. THE HOLE IN THE ORE BIN FLOOR CAN BE SEEN, AND BALL MILL FOUNDATION AT LOWER LEFT CORNER. SEE CA-291-47(CT) FOR IDENTICAL COLOR TRANSPARENCY. - Keane Wonder Mine, Park Route 4 (Daylight Pass Cutoff), Death Valley Junction, Inyo County, CA

  10. Apparatus for positioning modular components on a vertical or overhead surface

    NASA Technical Reports Server (NTRS)

    Haynig, C. C.; Messineo, S. V. (Inventor)

    1976-01-01

    An apparatus is disclosed for holding a plurality of modular components against a surface. A fixture prepositions the components and a vacuum develops a uniform pressure which presses and holds the fixture and objects against a surface. The surface may be curved, vertical, or overhead and since local load concentrations are avoided, fragile ceramic tiles may be installed using the apparatus.

  11. Demonstrating Heat Changes on the Overhead Projector with a Projecting Thermometer.

    ERIC Educational Resources Information Center

    Hur, Chinhyu; Solomon, Sally; Wetzel, Christy

    1998-01-01

    Heat changes in a lecture setting can be safely shown on an overhead projector using a simple and inexpensive apparatus. Heat evolution can be observed on a projector with adapted digital thermometers or by illuminating the red fluid in nonmercury thermometers. Describes a setup for doing this as well as a collection of demonstrations involving…

  12. 30 CFR 57.19110 - Overhead protection for shaft deepening work.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Overhead protection for shaft deepening work. 57.19110 Section 57.19110 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL...

  13. 30 CFR 56.19110 - Overhead protection for shaft deepening work.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Overhead protection for shaft deepening work. 56.19110 Section 56.19110 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND...

  14. 45. DETAIL OF OVERHEAD SERVICE CRANE (5TON CRANE MANUFACTURED BY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. DETAIL OF OVERHEAD SERVICE CRANE (5-TON CRANE MANUFACTURED BY ARMINGTON CARRIAGE; 3-TON HOIST MANUFACTURED BY WRIGHT HOIST COMPANY) IN VALVEHOUSE FOR NEEDLE VALVE OUTLET WORKS ON GALLERY 2. VIEW TO EAST. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  15. Demonstrating Biological Principles Efficiently and Effectively: The Overhead Is More than Just a Lighted Chalkboard

    ERIC Educational Resources Information Center

    Barden-Gabbei, Laura M.

    2006-01-01

    The overhead projector is an excellent tool for teachers at both the high school and college level. Teachers often use it to display class notes as they monitor students' actions and reactions to the concepts being presented and discussed, to display diagrams and figures too complex to draw on the chalkboard, and more recently to display computer…

  16. The Use of Probability Theory as a Basis for Planning and Controlling Overhead Costs in Education and Industry. Final Report.

    ERIC Educational Resources Information Center

    Vinson, R. B.

    In this report, the author suggests changes in the treatment of overhead costs by hypothesizing that "the effectiveness of standard costing in planning and controlling overhead costs can be increased through the use of probability theory and associated statistical techniques." To test the hypothesis, the author (1) presents an overview of the…

  17. 78 FR 68477 - Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ... Act of 1995 (44 U.S.C. 3506 et seq.) and Secretary of Labor's Order No. 1-2012 (77 FR 3912). Signed at... Occupational Safety and Health Administration Overhead and Gantry Cranes; Extension of the Office of Management...) approval of the information collection requirements specified in the Standard on Overhead and Gantry...

  18. 75 FR 44288 - Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ... Secretary of Labor's Order No. 5-2007 (72 FR 31160). Signed at Washington, DC, on July 22, 2010. David... Occupational Safety and Health Administration Overhead and Gantry Cranes; Extension of the Office of Management...) approval of the information collection requirements specified in the Standard on Overhead and Gantry...

  19. Wire chambers revisited.

    PubMed

    Ott, R J

    1993-04-01

    Detectors used for radioisotope imaging have, historically, been based on scintillating crystal/photomultiplier combinations in various forms. From the rectilinear scanner through to modern gamma cameras and positron cameras, the basic technology has remained much the same. Efforts to overcome the limitations of this form of technology have foundered on the inability to reproduce the required sensitivity, spatial resolution and sensitive area at acceptable cost. Multiwire proportional chambers (MWPCs) have long been used as position-sensitive charged particle detectors in nuclear and high-energy physics. MWPCs are large-area gas-filled ionisation chambers in which large arrays of fine wires are used to measure the position of ionisation produced in the gas by the passage of charged particles. The important properties of MWPCs are high-spatial-resolution, large-area, high-count-rate performance at low cost. For research applications, detectors several metres square have been built and small-area detectors have a charged particle resolution of 0.4 mm at a count rate of several million per second. Modification is required to MWPCs for nuclear medicine imaging. As gamma rays or X-rays cannot be detected directly, they must be converted into photo- or Compton scatter electrons. Photon-electron conversion requires the use of high atomic number materials in the body of the chamber. Pressurised xenon is the most useful form of "gas only" photon-electron convertor and has been used successfully in a gamma camera for the detection of gamma rays at energies below 100 keV. This camera has been developed specifically for high-count-rate first-pass cardiac imaging. This high-pressure xenon gas MWPC is the key to a highly competitive system which can outperform scintillator-based systems. The count rate performance is close to a million counts per second and the intrinsic spatial resolution is better than the best scintillator-based camera. The MWPC camera produces quantitative

  20. Return to Preinjury Levels of Participation After Superior Labral Repair in Overhead Athletes: A Systematic Review

    PubMed Central

    Sciascia, Aaron; Myers, Natalie; Kibler, W. Ben; Uhl, Timothy L.

    2015-01-01

    Context Athletes often preoperatively weigh the risks and benefits of electing to undergo an orthopaedic procedure to repair damaged tissue. A common concern for athletes is being able to return to their maximum levels of competition after shoulder surgery, whereas clinicians struggle with the ability to provide a consistent prognosis of successful return to participation after surgery. The variation in study details and rates of return in the existing literature have not supplied clinicians with enough evidence to give overhead athletes adequate information regarding successful return to participation when deciding to undergo shoulder surgery. Objective To investigate the odds of overhead athletes returning to preinjury levels of participation after arthroscopic superior labral repair. Data Sources The CINAHL, MEDLINE, and SPORTDiscus databases from 1972 to 2013. Study Selection The criteria for article selection were (1) The study was written in English. (2) The study reported surgical repair of an isolated superior labral injury or a superior labral injury with soft tissue debridement. (3) The study involved overhead athletes equal to or less than 40 years of age. (4) The study assessed return to the preinjury level of participation. Data Extraction We critically reviewed articles for quality and bias and calculated and compared odds ratios for return to full participation for dichotomous populations or surgical procedures. Data Synthesis Of 215 identified articles, 11 were retained: 5 articles about isolated superior labral repair and 6 articles about labral repair with soft tissue debridement. The quality range was 11 to 17 (42% to 70%) of a possible 24 points. Odds ratios could be generated for 8 of 11 studies. Nonbaseball, nonoverhead, and nonthrowing athletes had a 2.3 to 5.8 times greater chance of full return to participation than overhead/throwing athletes after isolated superior labral repair. Similarly, nonoverhead athletes had 1.5 to 3.5 times greater

  1. Plasma arc torch with coaxial wire feed

    DOEpatents

    Hooper, Frederick M

    2002-01-01

    A plasma arc welding apparatus having a coaxial wire feed. The apparatus includes a plasma arc welding torch, a wire guide disposed coaxially inside of the plasma arc welding torch, and a hollow non-consumable electrode. The coaxial wire guide feeds non-electrified filler wire through the tip of the hollow non-consumable electrode during plasma arc welding. Non-electrified filler wires as small as 0.010 inches can be used. This invention allows precision control of the positioning and feeding of the filler wire during plasma arc welding. Since the non-electrified filler wire is fed coaxially through the center of the plasma arc torch's electrode and nozzle, the wire is automatically aimed at the optimum point in the weld zone. Therefore, there is no need for additional equipment to position and feed the filler wire from the side before or during welding.

  2. Californium Recovery from Palladium Wire

    SciTech Connect

    Burns, Jon D.

    2014-08-01

    The recovery of 252Cf from palladium-252Cf cermet wires was investigated to determine the feasibility of implementing it into the cermet wire production operation at Oak Ridge National Laboratory’s Radiochemical Engineering Development Center. The dissolution of Pd wire in 8 M HNO3 and trace amounts of HCl was studied at both ambient and elevated temperatures. These studies showed that it took days to dissolve the wire at ambient temperature and only 2 hours at 60°C. Adjusting the ratio of the volume of solvent to the mass of the wire segment showed little change in the kinetics of dissolution, which ranged from 0.176 mL/mg down to 0.019 mL/mg. A successful chromatographic separation of 153Gd, a surrogate for 252Cf, from Pd was demonstrated using AG 50x8 cation exchange resin with a bed volume of 0.5 mL and an internal diameter of 0.8 cm.

  3. Comparison of the thoracic flexion relaxation ratio and pressure pain threshold after overhead assembly work and below knee assembly work

    PubMed Central

    Yoo, Won-gyu

    2016-01-01

    [Purpose] The purpose of this study was to compare the thoracic flexion relaxation ratio following overhead work and below-knee work. [Subjects and Methods] Ten men (20–30 years) were recruited to this study. The thoracic flexion relaxation ratio and pressure pain threshold was measured after both overhead work and below-knee work. [Results] The pressure-pain thresholds of the thoracic erector spinae muscle decreased significantly from initial, to overhead, to below-knee work. Similarly, the thoracic flexion relaxation ratio decreased significantly from initial, to overhead, to below-knee work. [Conclusion] Below-knee work results in greater thoracic pain than overhead work. Future studies should investigate below-knee work in detail. This study confirmed the thoracic relaxation phenomenon in the mid-position of the thoracic erector spinae. PMID:26957744

  4. Lightning and surge protection of large ground facilities

    NASA Astrophysics Data System (ADS)

    Stringfellow, Michael F.

    1988-04-01

    The vulnerability of large ground facilities to direct lightning strikes and to lightning-induced overvoltages on the power distribution, telephone and data communication lines are discussed. Advanced electrogeometric modeling is used for the calculation of direct strikes to overhead power lines, buildings, vehicles and objects within the facility. Possible modes of damage, injury and loss are discussed. Some appropriate protection methods for overhead power lines, structures, vehicles and aircraft are suggested. Methods to mitigate the effects of transients on overhead and underground power systems as well as within buildings and other structures are recommended. The specification and location of low-voltage surge suppressors for the protection of vulnerable hardware such as computers, telecommunication equipment and radar installations are considered. The advantages and disadvantages of commonly used grounding techniques, such as single point, multiple and isolated grounds are compared. An example is given of the expected distribution of lightning flashes to a large airport, its buildings, structures and facilities, as well as to vehicles on the ground.

  5. Ground Operations

    NASA Technical Reports Server (NTRS)

    Eastman, Randy

    2000-01-01

    The contents include: 1) Integrated Space Transportation; 2) Fourth Generation Reusable Launch Vehicle (RLV) Research; 3) Ground Operations; 4) Ground Operations Technologies; 5) Sensors; and 6) Umbilicals. This paper is presented in viewgraph form.

  6. Antenna coupled photonic wire lasers.

    PubMed

    Kao, Tsung-Yu; Cai, Xiaowei; Lee, Alan W M; Reno, John L; Hu, Qing

    2015-06-29

    Slope efficiency (SE) is an important performance metric for lasers. In conventional semiconductor lasers, SE can be optimized by careful designs of the facet (or the modulation for DFB lasers) dimension and surface. However, photonic wire lasers intrinsically suffer low SE due to their deep sub-wavelength emitting facets. Inspired by microwave engineering techniques, we show a novel method to extract power from wire lasers using monolithically integrated antennas. These integrated antennas significantly increase the effective radiation area, and consequently enhance the power extraction efficiency. When applied to wire lasers at THz frequency, we achieved the highest single-side slope efficiency (~450 mW/A) in pulsed mode for DFB lasers at 4 THz and a ~4x increase in output power at 3 THz compared with a similar structure without antennas. This work demonstrates the versatility of incorporating microwave engineering techniques into laser designs, enabling significant performance enhancements. PMID:26191717

  7. Deployment/retraction ground testing of a large flexible solar array

    SciTech Connect

    Chung, D.T.

    1982-05-01

    The simulated zero-gravity ground testing of the flexible fold-up solar array consisting of eighty-four full-size panels (.368 m x .4 m each) is addressed. Automatic, hands-off extension, retraction, and lockup operations are included. Three methods of ground testing were investigated: (1) vertical testing, (2) horizontal testing, using an overhead water trough to support the panels, and (3) horizontal testing, using an overhead track in conjunction with a counterweight system to support the panels. Method 3 was selected as baseline. The wing/assembly vertical support structure, the five-tier overhead track, and the mast-element support track comprise the test structure. The flexible solar array wing assembly was successfully extended and retracted numerous times under simulated zero-gravity conditions.

  8. Deployment/retraction ground testing of a large flexible solar array

    NASA Technical Reports Server (NTRS)

    Chung, D. T.

    1982-01-01

    The simulated zero-gravity ground testing of the flexible fold-up solar array consisting of eighty-four full-size panels (.368 m x .4 m each) is addressed. Automatic, hands-off extension, retraction, and lockup operations are included. Three methods of ground testing were investigated: (1) vertical testing; (2) horizontal testing, using an overhead water trough to support the panels; and (3) horizontal testing, using an overhead track in conjunction with a counterweight system to support the panels. Method 3 was selected as baseline. The wing/assembly vertical support structure, the five-tier overhead track, and the mast-element support track comprise the test structure. The flexible solar array wing assembly was successfully extended and retracted numerous times under simulated zero-gravity conditions.

  9. Designing potentials by sculpturing wires

    SciTech Connect

    Della Pietra, Leonardo; Aigner, Simon; Groth, Soenke; Hagen, Christoph von; Schmiedmayer, Joerg; Bar-Joseph, Israel; Lezec, Henri J.

    2007-06-15

    Magnetic trapping potentials for atoms on atom chips are determined by the current flow in the chip wires. By modifying the shape of the conductor we can realize specialized current flow patterns and therefore microdesign the trapping potentials. We have demonstrated this by nano-machining an atom chip using the focused ion beam technique. We built a trap, a barrier, and using a Bose-Einstein Condensate as a probe we showed that by polishing the conductor edge the potential roughness on the selected wire can be reduced. Furthermore, we give different other designs and discuss the creation of a one-dimensional magnetic lattice on an atom chip.

  10. Wire Detection Algorithms for Navigation

    NASA Technical Reports Server (NTRS)

    Kasturi, Rangachar; Camps, Octavia I.

    2002-01-01

    In this research we addressed the problem of obstacle detection for low altitude rotorcraft flight. In particular, the problem of detecting thin wires in the presence of image clutter and noise was studied. Wires present a serious hazard to rotorcrafts. Since they are very thin, their detection early enough so that the pilot has enough time to take evasive action is difficult, as their images can be less than one or two pixels wide. Two approaches were explored for this purpose. The first approach involved a technique for sub-pixel edge detection and subsequent post processing, in order to reduce the false alarms. After reviewing the line detection literature, an algorithm for sub-pixel edge detection proposed by Steger was identified as having good potential to solve the considered task. The algorithm was tested using a set of images synthetically generated by combining real outdoor images with computer generated wire images. The performance of the algorithm was evaluated both, at the pixel and the wire levels. It was observed that the algorithm performs well, provided that the wires are not too thin (or distant) and that some post processing is performed to remove false alarms due to clutter. The second approach involved the use of an example-based learning scheme namely, Support Vector Machines. The purpose of this approach was to explore the feasibility of an example-based learning based approach for the task of detecting wires from their images. Support Vector Machines (SVMs) have emerged as a promising pattern classification tool and have been used in various applications. It was found that this approach is not suitable for very thin wires and of course, not suitable at all for sub-pixel thick wires. High dimensionality of the data as such does not present a major problem for SVMs. However it is desirable to have a large number of training examples especially for high dimensional data. The main difficulty in using SVMs (or any other example-based learning

  11. Dimensioning of nearby substations interconnected ground system

    SciTech Connect

    Sobral, S.T. ); Costa, V.S. ); Campos, M.S.; Goldman, B. ); Mukhedkar, D. )

    1988-10-01

    This paper deals with the ground mat dimensioning of two or more neighbor interconnected substations, a situation that is very common in the Electrical Industry. The paper recalls that the external ground circuits connected to the ground grid of each substation can drastically reduce the percentage of total ground current injected into the soil through the mat (from 40% up to 2% of the total fault current). The paper presents a set of specific calculation procedures to deal with nearby interconnected ground mats. These procedures correspond to a particular illustration of the general ''Decoupled Method'' (3,4,5), showing how to apply its 8 sequencial steps to solve this type of circuit. The paper shows that the electric neighborhood of nearby substations depends on the ''Space Constant'' (or ''Characteristic Length'') of the ground circuits interconnecting them such as transmission line ground-wires, power cable sheaths, etc. This paper complements also Ref. (3,4), introducing the complete derivation of useful expressions used to solve lumped parameter ladder circuits of any size (from one pi to an infinite number of pis). The derivation of these expressions also used in (3,4) were not included in these References due to lack of space. In the paper it is also shown a simple procedure to determine the suitable number of ACSR ground-wire spans near a substation necessary to allow a reduction of the ground grid conductor extension.

  12. Anode wire aging tests with selected gases

    SciTech Connect

    Kadyk, J.; Wise, J.; Hess, D.; Williams, M. )

    1990-04-01

    As a continuation of earlier wire aging investigations, additional candidates for wire chamber gas and wire have been tested. These include the gases: argon/ethane, HRS gas, dimethyl ether, carbon dioxide/ethane, and carbon tetrafluoride/isobutane. Wires used were: gold- plated tungsten, Stablohm, Nicotin, and Stainless Steel. Measurements were made of the effects upon wire aging of impurities from plumbing materials or contamination from various types of oil. Attempts were made to induce wire aging by adding measured amounts of oxygen and halogen (methyl chloride) with negative results. In this paper, the possible role of electronegativity in the wire aging process is discussed, and measurements of electronegativity are made with several single carbon Freons, using both an electron capture detector and a wire chamber operating with dimethyl ether.

  13. Electrical wire insulation and electromagnetic coil

    DOEpatents

    Bich, George J.; Gupta, Tapan K.

    1984-01-01

    An electromagnetic coil for high temperature and high radiation application in which glass is used to insulate the electrical wire. A process for applying the insulation to the wire is disclosed which results in improved insulation properties.

  14. Quality control of microelectronic wire bonds

    NASA Technical Reports Server (NTRS)

    Thiel, R. A.; Schmidt, G. D.

    1975-01-01

    Report evaluates ultrasonic bonding of small-diameter aluminum wire joined to ceramic substrates metalized with thin-film and thick-film gold. Quick testing technique for nondestructive location of poor wire bonds is also presented.

  15. Put Your Cable Wiring to the Test.

    ERIC Educational Resources Information Center

    Day, C. William

    2001-01-01

    Discusses why schools and universities should use testing procedures in any wire bid specification for cable wiring and also know how experienced the installers are in testing and installing structured cabling systems. Key cabling terms are included. (GR)

  16. New insulation constructions for aerospace wiring applications

    NASA Technical Reports Server (NTRS)

    Slenski, George

    1994-01-01

    Outlined in this presentation is the background to insulation constructions for aerospace wiring applications, the Air Force wiring policy, the purpose and contract requirements of new insulation constructions, the test plan, and the test results.

  17. A manually set magnetic wire counter

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Magnetic storage wire counter design principles are given. Magnetic storage wire was coupled with two phase propagational driver in manual set counter shift register. Time delay between magnetic counter domain insertion and corresponding output pulse provides counting functions.

  18. Technique for stripping Teflon insulated wire

    NASA Technical Reports Server (NTRS)

    Babb, B. D.

    1967-01-01

    Cryogenic stripping of Teflon insulated wire leaves no residue and produces no physical damage. After the wire is immersed in liquid nitrogen, bent slightly, and returned to room temperature, the Teflon is removed by fingernails or flat-nosed pliers.

  19. Wire Capture Programs for Macintosh and IBM.

    ERIC Educational Resources Information Center

    Wiley, Gale

    1989-01-01

    Discusses wire capture programs (computer programs which gather and process wire services such as the Associated Press or United Press) for computer labs in journalism departments. Describes details of such programs for Macintosh, IBM, and IBM clones. (SR)

  20. Electrical Wire Insulation and Electromagnetic Coil

    SciTech Connect

    Bich, G. J.; Gupta, T. K.

    1984-01-31

    An electromagnetic coil for high temperature and high radiation application in which glass is used to insulate the electrical wire. A process for applying the insulation to the wire is disclosed which results in improved insulation properties.

  1. Unattended ground sensor situation assessment workstation

    NASA Astrophysics Data System (ADS)

    Jeppesen, David M.; Trellue, Ron

    1997-07-01

    Advancements in both sensor hardware technology and in software systems and processing technology have enabled the development of practical realtime situation assessment capabilities based upon information from unattended ground sensors. A decision support workstation that employs rule- based expert system processing of reports from unattended ground sensors is described. The primary goal of this development activity is to produce a suite of software to track vehicles using data from unattended ground sensors. The situational assessment products from this system have stand-alone utility, but are also intended to provide cueing support for overhead sensors and supplementary feeds to all- source fusion centers. The conceptual framework, developmental architecture, and demonstration field tests of the system are described.

  2. Flexible substrate for printed wiring

    NASA Technical Reports Server (NTRS)

    Asakura, M.; Yabe, K.; Tanaka, H.; Soda, A.

    1982-01-01

    A very flexible substrate for printed wiring is disclosed which is composed of a blend of phenoxy resin-polyisocyanate-brominated epoxy resin in which the equivalent ration of the functional groups is hydroxyl grouped: isocyanate group: epoxy group = 1:0.2 to 2:0.5 to 3. The product has outstanding solder resistance and is applied to metal without using adhesives.

  3. Health care's 100 most wired.

    PubMed

    Solovy, A; Serb, C

    1999-02-01

    They're wired all right, and America's 100 most techno-savvy hospitals and health systems share one more thing: a commitment to using technology to link with employees, patients, suppliers, and insurers. "We want to be a health care travel agency for our community," says one chief information officer. "And we see Internet technology as a key." PMID:10081454

  4. Regeneration: New Neurons Wire Up.

    PubMed

    Raymond, Pamela A

    2016-09-12

    Functional repair of damage in the nervous system requires re-establishment of precise patterns of synaptic connectivity. A new study shows that after selective ablation, zebrafish retinal neurons regenerate and reconstruct some, although not all, of their stereotypic wiring. PMID:27623258

  5. Fabrication of tungsten wire needles

    SciTech Connect

    Roder, A.

    1983-02-01

    Fine point needles for field emissoin are conventionally produced by electrolytically or chemically etching tungsten wire. Points formed in this manner have a typical tip radius of about 0.5 microns and a cone angle of some 30 degrees. The construction of needle matrix detector chambers has created a need for tungsten needles whose specifications are: 20 mil tungsten wire, 1.5 inch total length, 3 mm-long taper (resulting in a cone angle of about 5 degrees), and 25 micron-radius point (similar to that found on sewing needles). In the process described here for producing such needles, tungsten wire, immersed in a NaOH solution and in the presence of an electrode, is connected first to an ac voltage and then to a dc supply, to form a taper and a point on the end of the wire immersed in the solution. The process parameters described here are for needles that will meet the above specifications. Possible variations will be discussed under each approprite heading.

  6. Plated wire random access memories

    NASA Technical Reports Server (NTRS)

    Gouldin, L. D.

    1975-01-01

    A program was conducted to construct 4096-work by 18-bit random access, NDRO-plated wire memory units. The memory units were subjected to comprehensive functional and environmental tests at the end-item level to verify comformance with the specified requirements. A technical description of the unit is given, along with acceptance test data sheets.

  7. Wire-Wrap Chatter Detector

    NASA Technical Reports Server (NTRS)

    Fisch, G. Z.; Borden, T. J.

    1982-01-01

    Monitoring circuit responds to changes in resistance as little as 0.1 ohm. Has been used to detect defective wire-wrap connections during thermal and vibration tests. Defect is indicated to operator by light-emitting diode and by increase in count on a two-digit display.

  8. Ultrasonic Calibration Wire Test Phantom

    SciTech Connect

    Lehman, S K; Fisher, K A; Werve, M; Chambers, D H

    2004-09-24

    We designed and built a phantom consisting of vertical wires maintained under tension to be used as an ultrasonic test, calibration, and reconstruction object for the Lawrence Livermore National Laboratory annular array scanner. We provide a description of the phantom, present example data sets, preliminary reconstructions, example metadata, and MATLAB codes to read the data.

  9. Transport Through Carbon Nanotube Wires

    NASA Technical Reports Server (NTRS)

    Anantram, M. P.; Kwak, Dochan (Technical Monitor)

    2001-01-01

    This viewgraph presentation deals with the use of carbon nanotubes as a transport system. Contact, defects, tubular bend, phonons, and mechanical deformations all contribute to reflection within the nanotube wire. Bragg reflection, however, is native to an ideal energy transport system. Transmission resistance depends primarily on the level of energy present. Finally, the details regarding coupling between carbon nanotubes and simple metals are presented.

  10. Novel Wiring Technologies for Aerospace Applications

    NASA Technical Reports Server (NTRS)

    Gibson, Tracy L.; Parrish, Lewis M.

    2014-01-01

    Because wire failure in aerospace vehicles could be catastrophic, smart wiring capabilities have been critical for NASA. Through the years, researchers at Kennedy Space Center (KSC) have developed technologies, expertise, and research facilities to meet this need. In addition to aerospace applications, NASA has applied its knowledge of smart wiring, including self-healing materials, to serve the aviation industry. This webinar will discuss the development efforts of several wiring technologies at KSC and provide insight into both current and future research objectives.

  11. Further Studies Of Hot-Wire Anemometry

    NASA Technical Reports Server (NTRS)

    Mckenzie, Robert; Logan, Pamela; Bershader, Daniel

    1990-01-01

    Report discusses factors affecting readings of hot-wire anemometer in turbulent supersonic boundary layer. Represents extension of work described in "Hot-Wire Anemometry Versus Laser-Induced Fluorescence" (ARC-11802). Presents theoretical analysis of responses of hot-wire probe to changes in flow; also compares measurements by hot-wire probe with measurements of same flows by laser-induced fluorescence (LIF).

  12. Different mechanical properties in Seldinger guide wires

    PubMed Central

    Schummer, Wolfram

    2015-01-01

    Background and Aims: Most central venous catheters are placed using Seldinger guide wires. EN ISO 11070 is the guideline for testing guide wire flexing performance and tensile strength, and we can safely assume that guide wires in use meet these requirements. Unfortunately, EN ISO 11070 guidelines do not reflect the clinical requirements and we continue to see mechanical failures and their associated complications. Material and Methods: This in vitro study was performed in an accredited laboratory. With regard to flexing, we: (1) Established the minimum flexing performance needed to meet clinical requirements, (2) developed flexing performance tests which mimic clinical requirement, and (3) evaluated the mechanical properties of various guide wires relative to these requirements. With regard to tensile strength, we used the testing method prescribed in ISO 11070, but did not end the test at 5 Newton (N). We continued until the guide wire was damaged, or we reached maximum tractive force. We then did a wire-to-wire comparison. We examined two basic wire constructions, monofil and core and coil. Results: Tensile strength: All wires tested, except one, met EN ISO 11070 requirements for 5 N tensile strength. The mean of the wire types tested ranged from 15.06 N to 257.76 N. Flexing performance: None of the wires kinked. The monofil had no evidence of bending. Two core/coil wires displayed minor bending (angle 1.5°). All other wires displayed bending angles between 22.5° and 43.0°. Conclusion: We recommend that: (1) Clinicians use guide wires with high-end mechanical properties, (2) EN ISO 11070 incorporate our flexing test into their testing method, raise the flexing requirement to kink-proof, (3) and raise the tensile strength requirement to a minimum of 30 N, and (3) all manufacturers and suppliers be required to display mechanical properties of all guide wire, and guide wire kits sold. PMID:26702209

  13. NEMA wire and cable standards development programs

    NASA Technical Reports Server (NTRS)

    Baird, Robert W.

    1994-01-01

    The National Electrical Manufacturers Association (NEMA) is the nation's largest trade association for manufacturers of electrical equipment. Its member companies produce components, end-use equipment and systems for the generation, transmission, distribution, control and use of electricity. The wire and cable division is presented in 6 sections: building wire and cable, fabricated conductors, flexible cords, high performance wire and cable, magnet wire, and power and control cable. Participating companies are listed.

  14. 49 CFR 236.838 - Wire, shunt.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Wire, shunt. 236.838 Section 236.838 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Wire, shunt. A wire forming part of a shunt circuit....

  15. 30 CFR 57.12047 - Guy wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Guy wires. 57.12047 Section 57.12047 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Electricity Surface and Underground § 57.12047 Guy wires. Guy wires of...

  16. Getting "Wired" for McLuhan's Cyberculture.

    ERIC Educational Resources Information Center

    McMurdo, George

    1995-01-01

    Examines the introduction of the computing magazine, "Wired", into the United Kingdom's (UK) market. Presents conversations with the founder and editorial staff of the UK edition, and discusses the accessibility of "Wired" via the World Wide Web. Describes 10 articles from United States "Wired" back-issues and presents critiques of a utopian…

  17. 49 CFR 393.28 - Wiring systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Wiring systems. 393.28 Section 393.28 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.28 Wiring...

  18. Home and School Technology: Wired versus Wireless.

    ERIC Educational Resources Information Center

    Van Horn, Royal

    2001-01-01

    Presents results of informal research on smart homes and appliances, structured home wiring, whole-house audio/video distribution, hybrid cable, and wireless networks. Computer network wiring is tricky to install unless all-in-one jacketed cable is used. Wireless phones help installers avoid pre-wiring problems in homes and schools. (MLH)

  19. Evaluation of overhead guide sign sheeting materials to increase visibility and safety for drivers.

    PubMed

    Obeidat, Mohammed Said; Rys, Malgorzata J; Rys, Andrew; Du, Juan

    2016-09-01

    Overhead guide sign visibility must increase to improve driver safety on roadways. Two methods increase overhead guide sign visibility: sign illumination and use of retroreflective sheeting materials. This paper compares three types of retroreflective sheeting: Engineering Grade (type I), Diamond Grade (type XI), and High Intensity (type IV). A field experiment was conducted at night using licensed drivers to determine the optimum retroreflective sheeting material that increases sign visibility and legibility. Results showed that, of the three types of retroreflective sheeting, Diamond Grade (type XI) sheeting requires minimum illuminance to be visible, followed by High Intensity (type IV) sheeting. Cost analysis, including labor, maintenance, and material cost components of the three retroreflective sheeting materials, showed that High Intensity (type IV) could increase sign visibility and legibility at night for Departments of Transportation with limited budgets, consequently increasing driver safety on roadways. PMID:27184321

  20. REPORT ON THE ANALYSIS OF WAC SAMPLES FROM EVAPORATOR OVERHEADS FOR 2011

    SciTech Connect

    Washington, A.

    2012-03-29

    This report tabulates the chemical analysis of the 3H, 2H and 2F evaporator overhead samples including the inorganic, organic, and radionuclide species according the ETP WAC (rev.4). In addition, the physical properties including pH, total suspended solids, and average particle size are listed for each sample. The report identifies all sample receipt dates, preparation methods, and analyses completed to accumulate these values. All values were found to be within the ETP WAC specifications for WWCT except for the {sup 137}Cs concentration for the 2F sample which was slightly above the limit ({approx}5%). However, tank farm personnel sample each tank overhead for beta/gamma prior to transfer using a pulse height analyzer and these field readings were all well within limits. Additional actions will be taken to help understand the reason in the discrepancy of the field measurement versus laboratory analysis.