Science.gov

Sample records for planning approach final

  1. A stochastic approach to project planning in an R and D environment: Final report

    SciTech Connect

    Seyedghasemipour, S.J.

    1987-02-01

    This study describes a simulation approach to project planning in an R and D environment by network model. GERT (Graphical Evaluation and Review Technique), a network model, was utilized for the modeling of a hypothetical research and development project. GERT is a network model capable of including randomness in activity duration, probabilistic branching, feedback loop, and multiple terminate node in a project planning. These capabilities make it more suitable for modeling of research and development projects than the previous approaches such as CPM and PERT. SLAM II simulation language is utilized for simulation of the network model. SLAM II is a simulation language which heavily relies on GASP IV and Q-GERTS with powerful modeling capability in a single integrated framework. The simulation is performed on a hypothetical ''standard'' research and development project. Two cases of project planning are considered. In the first case, the traditional simulation of network model of the hypothetical R and D project is performed. In the second case, learning factor is incorporated in the simulation process. Learning factor, in the context of project planning, means the mean and variance of a probability distribution representing an activity duration is discounted (reduced) every time that activity is repeated. The results and statistics of each case study concerning expected duration of successful completion of the project, probability of washouts, and realization time of milestones are presented in details. The differences between two cases (i.e., with and without learning factor) are discussed. 19 refs.

  2. 300 Area dangerous waste tank management system: Compliance plan approach. Final report

    SciTech Connect

    1996-03-01

    In its Dec. 5, 1989 letter to DOE-Richland (DOE-RL) Operations, the Washington State Dept. of Ecology requested that DOE-RL prepare ``a plant evaluating alternatives for storage and/or treatment of hazardous waste in the 300 Area...``. This document, prepared in response to that letter, presents the proposed approach to compliance of the 300 Area with the federal Resource Conservation and Recovery Act and Washington State`s Chapter 173-303 WAC, Dangerous Waste Regulations. It also contains 10 appendices which were developed as bases for preparing the compliance plan approach. It refers to the Radioactive Liquid Waste System facilities and to the radioactive mixed waste.

  3. Personal Approaches to Career Planning.

    ERIC Educational Resources Information Center

    DeMont, Billie; DeMont, Roger

    1983-01-01

    Identifies four approaches to career planning based on situational leadership theory: the network approach, self-help approach, engineering approach, and mentor approach. Guidelines for the selection of a planning method based on the nature of the work environment and personal preference are discussed. (JAC)

  4. Final Draft Strategic Marketing Plan.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-02-01

    The Bonneville Power Administration (BPA) has developed a marketing plan to define how BPA can be viable and competitive in the future, a result important to BPA`s customers and constituents. The Marketing Plan represents the preferred customer outcomes, marketplace achievements, and competitive advantage required to accomplish the Vision and the Strategic Business Objectives of the agency. The Marketing Plan contributes to successful implementation of BPA`s Strategic Business Objectives (SBOs) by providing common guidance to organizations and activities throughout the agency responsible for (1) planning, constructing, operating, and maintaining the Federal Columbia River Power System; (2) conducting business with BPA`s customers; and (3) providing required internal support services.

  5. Technical planning activity: Final report

    SciTech Connect

    Not Available

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  6. A unified motion planning approach for redundant and non-redundant manipulators with actuator constraints. Ph.D. Thesis Final Report

    NASA Technical Reports Server (NTRS)

    Chung, Ching-Luan

    1990-01-01

    The term trajectory planning has been used to refer to the process of determining the time history of joint trajectory of each joint variable corresponding to a specified trajectory of the end effector. The trajectory planning problem was solved as a purely kinematic problem. The drawback is that there is no guarantee that the actuators can deliver the effort necessary to track the planned trajectory. To overcome this limitation, a motion planning approach which addresses the kinematics, dynamics, and feedback control of a manipulator in a unified framework was developed. Actuator constraints are taken into account explicitly and a priori in the synthesis of the feedback control law. Therefore the result of applying the motion planning approach described is not only the determination of the entire set of joint trajectories but also a complete specification of the feedback control strategy which would yield these joint trajectories without violating actuator constraints. The effectiveness of the unified motion planning approach is demonstrated on two problems which are of practical interest in manipulator robotics.

  7. Threat displays for final approach

    NASA Astrophysics Data System (ADS)

    Jennings, Chad Warren

    During periods of good visibility, airports can conduct Closely Spaced Parallel Approaches (CSPA) and simultaneously operate parallel runways separated by more than 750 feet. When visibility degrades to Instrument Meteorological Conditions (IMC) and pilots must fly exclusively by the instruments, the runway separation required to operate parallel runways increases to 3400 feet or more. For many airports around the country and the world this means the second runway must be closed and the airport operates at half capacity. To alleviate the delays caused by this capacity reduction many airports worldwide are planning to expand and build new runways. The projected cost of the ten largest airport projects in the United States is $8-16 Billion. Perhaps a less expensive solution can be found with innovative technology rather than real estate? This research presents the first ever design, implementation, and characterization of a synthetic vision display and the supporting flight system to attempt to achieve this solution. The display uses 3D graphics and an air to air datalink called Automatic Dependent Surveillance--Broadcast to present the pilot with the information necessary to aviate, navigate and monitor traffic. This thesis also documents the first series of flight experiments to test the applicability of synthetic vision displays to both runway incursion avoidance and CSPA. Finally, utilizing the results from the flight testing in a Monte Carlo analysis, the effect of deploying this display on minimum safe runway separation is calculated. It has been found that the minimum safe runway separation for IMC operation can safely be reduced to 1900 feet. If, in addition, significant changes are made in Air Traffic Control procedures for longitudinal aircraft spacing, the analysis shows that the display system presented herein will allow for runway separation of 1400 feet with no new restrictions on aircraft size or crosswind. Furthermore, with certain restrictions on

  8. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  9. Project "Flashlight" Planning Grant. Final Report.

    ERIC Educational Resources Information Center

    Ehrmann, Stephen C.

    This final report describes results of a planning grant for the "Flashlight" project, an effort to develop, test, and disseminate evaluation procedures that a postsecondary institution or department could use to periodically assess its evolving educational strategies, in particular strategies supported by use of computing, video, and…

  10. Reconstitution planning: SPC final report 1424. [System Planning Corporation (SPC)

    SciTech Connect

    Not Available

    1992-06-01

    The Office of the Deputy Under Secretary of Defense for Policy ODUSD(P) tasked the University of California's Los Alamos National Laboratory (LANL) to conduct a study to determine and assess the requirements and options for maintaining and developing a flexible and sustainable reconstitution base over the long term. In support of that study effort, System Planning Corporation (SPC) working closely with ODUSD(P) staff, developed and demonstrated an analytic process for conducting DoD reconstitution planning analyses on a regular basis and as part of the DoD PPBS. Within ODUSD(P), this planning approach is often referred to generically as a capacity-driven'' planning approach. Under the SPC-developed planning approach, DoD components would develop and maintain a family of reconstitution plans organized hierarchically on the basis of broad equipment categories (i.e., aircraft, ships, tracked combat vehicles, missiles and space, and munitions). For each selected broad equipment category, the cognizant DoD component will develop a reconstitution planning document that addresses a 20-year planning horizon. The analytic process to be used in support of activation scheduling would consist of the following activities; Defining appropriate demand schedule(s) for providing reconstitution response options; Identifying a menu of programmatic options for satisfying the above demand schedule; Conducting sensitivity and cost analyses; Selecting a set of reconstitution program options; Integrating and summarizing in a comprehensive, Department-wide manner reconstitution program options for all reconstitution plans; Developing and issuing planning guidance to DoD components; Estimating and projecting needed budgetary resources; Defending selected reconstitution programs throughout the PPBS process and Congressional budget process.

  11. Final Action Plan to Tiger Team

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  12. Technical approach to groundwater restoration. Final report

    SciTech Connect

    Not Available

    1993-11-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) and minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.

  13. WRAP program evaluation. Task 10, Evaluation of the low-income screening methodology; Task 11, Evaluation of the low-income program collaborative planning approach: [Final report

    SciTech Connect

    Ferrey, S.

    1990-12-31

    The ``Weatherization Residential Assistance Partnership,`` or WRAP program, is a fuel-blind conservation program designed to assist Northeast Utilities` low-income customers to use energy safely and efficiently. Innovative with respect to its collaborative approach and its focus on utilizing and strengthening the existing low-income weatherization service delivery network, the WRAP program offers an interesting model to other utilities which traditionally have relied on for-profit energy service contractors and highly centralized program implementation structures. This evaluation of the WRAP program is designed to: (1) Review the continuing relevance of the demand-side management option screening methodology for determining program configuration for services delivery, including rural populations; (2) locate and analyze recent additions to the energy conservation literature, data and information that bear on design of the WRAP program; and (3) through interviews assess participant impressions of the collaborative process used to plan, develop and implement the WRAP process.

  14. Groundwater monitoring well assessment final work plan

    SciTech Connect

    Not Available

    1993-10-01

    Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EA has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.

  15. 78 FR 44592 - Final General Management Plan, Final Wilderness Study, and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... Statement, Fort Pulaski National Monument, Georgia AGENCY: National Park Service, Interior. ACTION: Notice... Environmental Impact Statement for the General Management Plan and Wilderness Study (Final EIS/GMP/WS) for Fort... at Fort Pulaski National Monument Headquarters, Cockspur Island, US Highway 80 East,...

  16. Local Administrators Planning Handbook. Final Report.

    ERIC Educational Resources Information Center

    Dyrenfurth, Michael J.; Dunlap, William S.

    As part of a project to develop a planning guide to assist local vocational education administrators in improving their planning efforts, a needs assessment questionnaire was developed to identify the degree of need for assistance in planning activities. Two hundred sixty-four Missouri local vocational administrators completed the pilot-tested…

  17. ATST Enclosure final design and construction plans

    NASA Astrophysics Data System (ADS)

    Murga, Gaizka; Marshall, Heather; Ariño, Javier; Lorentz, Tom

    2012-09-01

    The Advanced Technology Solar Telescope (ATST) is a 4-m class solar telescope to be built at the Haleakal' High Altitude Observatory Site in Maui, Hawai'i. It will be the largest solar telescope in the world, with unprecedented abilities to view details of the Sun. Using adaptive optics technology, ATST will be able to provide the sharpest views ever taken of the solar surface. It is expected that the 4-meter class telescope will have a significant impact on the study of stellar magnetic fields, plasma physics and astronomy, allowing scientists to learn even more about the Sun and solarterrestrial interactions. The ATST enclosure is unique in its functionality, as not only it provides protection from adverse weather conditions when not in operation, but it also positions the telescope Aperture Stop which must be accurately aligned so that the primary mirror is fully illuminated, while insolation in other telescope equipment is prevented. The proposed design is based on a multi-sector shutter system arrangement with an innovative crawler drive system (patent pending) assembled on two steel fabricated arch girders. These arch girders are stiffened by a secondary structure and supported on a steel fabricated base ring. The base ring rests on an azimuth mechanism composed of several driven/idling bogies. The outer shape of the enclosure is configured by the secondary structure which supports the cladding and has been selected so as to minimize the solar irradiated surface and reduce shell seeing in early morning hours when the seeing is the best. This paper describes the work performed by AEC IDOM and ATST team to define both the final design of the Enclosure and the construction plan to erect it at the Observatory Site.

  18. Final Consolidated action plan to Tiger Team

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implemenation by Sandia and monitoring by DOE. This volume (2) contains information and corrective action plans pertaining to safety and health and management practices.

  19. Sensitivity-constrained nonlinear programming: a general approach for planning and design under parameter uncertainty and an application to treatment plant design. Final report

    SciTech Connect

    Uber, J.G.; Kao, J.J.; Brill, E.D.; Pfeffer, J.T.

    1988-01-01

    One important problem with using mathematical models is that parameter values, and thus the model results, are often uncertain. A general approach, Sensitivity Constrained Nonlinear Programming (SCNLP), was developed for extending nonlinear optimization models to include functions that depend on the system sensitivity to changes in parameter values. Such sensitivity-based functions include first-order measures of variance, reliability, and robustness. Thus SCNLP can be used to generate solutions or designs that are good with respect to modeled objectives, and that also reflect concerns about uncertainty in parameter values. A solution procedure and an implementation based on an existing nonlinear-programming code are presented. SCNLP was applied to a complex activated sludge waste-water treatment plant design problem.

  20. An Evolutionary Approach to Intelligent Planning

    NASA Astrophysics Data System (ADS)

    Mehta, Shikha; Sachdeva, Bhuvan; Bhargava, Rohit; Banati, Hema

    With the explosion of information on WWW, planning and decision making has become a tedious task. The huge volume of distributed and heterogeneous information resources and the complexity involved in their coordination and scheduling leads to difficulties in the conception of optimal plans. This paper presents an intelligent planner which uses modified Genetic Algorithm assisted Case Based Reasoning (CBR) to solve the cold start problem faced by CBR systems and generates novel plans. This approach minimizes the need of populating preliminary cases in the CBR systems. The system is capable of generating synchronized optimal plans within the specified constraints. The effectiveness of the approach is demonstrated with the help of case study on e-Travel Planning. Rigorous experiments were performed to generate synchronized plans with one hop and two hops between train and flight modes of transport. Results proved that GA assisted CBR outperforms the traditional CBR significantly in providing the number of optimized plans and solving cold start problem.

  1. Strategic Planning: The Catastrophic Approach.

    ERIC Educational Resources Information Center

    Brody, Stanley J.

    1987-01-01

    Reviews and defines continuity of care, or long term care, as a potential economic catastrophe which requires strategic planning. Proposes a Medicare revision that provides integrated funding for acute, sub-acute, and long-term care as elements of continuity of care. (Author/ABB)

  2. Final consolidated action plan to Tiger Team

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implementation by Sandia and monitoring by DOE. This volume (I) contains the findings and actions concerning the environment. Tables 4.2 and 4.7 summarize the annual costs estimated for completing the actions. The total costs for completion of all the actions are estimated to be $283 million over a 12 year period; the majority of the actions to be completed and costs incurred in the first five years. Resources are provided from DOE-ER/WM, the DOE/DP landlord funds (one time, physical fixes), and from the Sandia Indirect Budget.

  3. Test Planning Approach and Lessons

    NASA Technical Reports Server (NTRS)

    Parkinson, Douglas A.; Brown, Kendall K.

    2004-01-01

    As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.

  4. Northeast Regional Education Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Northeast Regional Exchange Steering Committee, Boston, MA.

    Created to facilitate the dissemination of information between researchers and the educational community, the Northeast Regional Exchange steering committee has defined needs, determined agency qualifications, identified priorities, undertaken a series of minigrant projects, and developed plans for the extension of these projects and a study of…

  5. The Devils Lake Planning Grant. Final Report.

    ERIC Educational Resources Information Center

    Brady, William J.; Thompson, Irving D.

    Results of a planning grant received by the Devils Lake, North Dakota, school district under Title III of the Elementary and Secondary Education Act (ESEA) are presented. The project included an enrollment survey of the public and non-public schools in a 10-county area; a vocational survey of seniors, parents of seniors, juniors, and sophomores in…

  6. SPATIAL APPROACH TO PLANNING THE PHYSICAL ENVIRONMENT.

    ERIC Educational Resources Information Center

    BELLOMY, CLEON C.; CAUDILL, WILLIAM W.

    THE PURPOSE OF THIS REPORT DEFINES THE SPATIAL APPROACH TO PLANNING THE PHYSICAL ENVIRONMENT AND SUGGESTS A MORE NATURAL APPROACH TO A LESS RESTRICTED ARCHITECTURE. ONE OF THE TWO BASIC ARCHITECTURAL ELEMENTS IN THE SPATIAL CONCEPT IS THE HORIZONTAL SCREEN WHICH KEEPS THE SUN AND RAIN OFF, LETS IN LIGHT, KEEPS OUT SUN HEAT, RETAINS ROOM HEAT, AND…

  7. Maglev program test plan. Final report

    SciTech Connect

    deBenedet, D.; Gilchrist, A.J.; Karanian, L.A.

    1992-07-01

    Maglev systems represent a promising evolution in the high-speed ground transportation, offering speeds in excess of 300 mph along with the potential for low operating costs and minimal environmental impact. The goal of this effort is to investigate the feasibility and viability of maglev systems in the United States. The emergence of a sophisticated technology such as maglev requires a need for a coordinated research test program and the determination of test requirements to identify and mitigate development risk and to maximize the use of domestic resources. The study is directed toward the identification and characterization of maglev systems development risks tied to a preliminary system architecture. Research objectives are accomplished by surveying experiences from previous maglev development programs, both foreign and domestic, and interviews with individuals involved with maglev research and testing. Findings include ninety-four distinct development risks and twenty risk types. Planning and implementation requirements are identified for a maglev test program, including the development of a facilities strategy to meet any operational concepts that evolve out of early development effort. Also specified is the logical development flow and associated long-lead support needs for sub-scale and full-scale testing.

  8. Technical assistance contractor Management Plan. Final [report

    SciTech Connect

    Not Available

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  9. Transportation Planning with Immune System Derived Approach

    NASA Astrophysics Data System (ADS)

    Sugiyama, Kenji; Yaji, Yasuhito; Ootsuki, John Takuya; Fujimoto, Yasutaka; Sekiguchi, Takashi

    This paper presents an immune system derived approach for planning transportation of materials between manufacturing processes in the factory. Transportation operations are modeled by Petri Net, and divided into submodels. Transportation orders are derived from the firing sequences of those submodels through convergence calculation by the immune system derived excitation and suppression operations. Basic evaluation of this approach is conducted by simulation-based investigation.

  10. Benchmarking: A New Approach to Space Planning.

    ERIC Educational Resources Information Center

    Fink, Ira

    1999-01-01

    Questions some fundamental assumptions of historical methods of space guidelines in college facility planning, and offers an alternative approach to space projections based on a new benchmarking method. The method, currently in use at several institutions, uses space per faculty member as the basis for prediction of need and space allocation. (MSE)

  11. Planning in Education--A Systematic Approach

    ERIC Educational Resources Information Center

    Barker, L. J.

    1977-01-01

    Presents a case for and poses a procedure including techniques for a systematic approach to planning in education as a means of improving efficiency and effectiveness. Available from: Australian College of Education, 916 Swanston Street, Carlton, Victoria 3053, Australia, $2.50 single copy. (Author/MLF)

  12. Optimization approaches for planning external beam radiotherapy

    NASA Astrophysics Data System (ADS)

    Gozbasi, Halil Ozan

    Cancer begins when cells grow out of control as a result of damage to their DNA. These abnormal cells can invade healthy tissue and form tumors in various parts of the body. Chemotherapy, immunotherapy, surgery and radiotherapy are the most common treatment methods for cancer. According to American Cancer Society about half of the cancer patients receive a form of radiation therapy at some stage. External beam radiotherapy is delivered from outside the body and aimed at cancer cells to damage their DNA making them unable to divide and reproduce. The beams travel through the body and may damage nearby healthy tissue unless carefully planned. Therefore, the goal of treatment plan optimization is to find the best system parameters to deliver sufficient dose to target structures while avoiding damage to healthy tissue. This thesis investigates optimization approaches for two external beam radiation therapy techniques: Intensity-Modulated Radiation Therapy (IMRT) and Volumetric-Modulated Arc Therapy (VMAT). We develop automated treatment planning technology for IMRT that produces several high-quality treatment plans satisfying provided clinical requirements in a single invocation and without human guidance. A novel bi-criteria scoring based beam selection algorithm is part of the planning system and produces better plans compared to those produced using a well-known scoring-based algorithm. Our algorithm is very efficient and finds the beam configuration at least ten times faster than an exact integer programming approach. Solution times range from 2 minutes to 15 minutes which is clinically acceptable. With certain cancers, especially lung cancer, a patient's anatomy changes during treatment. These anatomical changes need to be considered in treatment planning. Fortunately, recent advances in imaging technology can provide multiple images of the treatment region taken at different points of the breathing cycle, and deformable image registration algorithms can

  13. Reference condition approach to restoration planning

    USGS Publications Warehouse

    Nestler, J.M.; Theiling, C.H.; Lubinski, S.J.; Smith, D.L.

    2010-01-01

    Ecosystem restoration planning requires quantitative rigor to evaluate alternatives, define end states, report progress and perform environmental benefits analysis (EBA). Unfortunately, existing planning frameworks are, at best, semi-quantitative. In this paper, we: (1) describe a quantitative restoration planning approach based on a comprehensive, but simple mathematical framework that can be used to effectively apply knowledge and evaluate alternatives, (2) use the approach to derive a simple but precisely defined lexicon based on the reference condition concept and allied terms and (3) illustrate the approach with an example from the Upper Mississippi River System (UMRS) using hydrologic indicators. The approach supports the development of a scaleable restoration strategy that, in theory, can be expanded to ecosystem characteristics such as hydraulics, geomorphology, habitat and biodiversity. We identify three reference condition types, best achievable condition (A BAC), measured magnitude (MMi which can be determined at one or many times and places) and desired future condition (ADFC) that, when used with the mathematical framework, provide a complete system of accounts useful for goal-oriented system-level management and restoration. Published in 2010 by John Wiley & Sons, Ltd.

  14. Implementation of Head Start Planned Variation Testing and Data Collection Effort. Final Report.

    ERIC Educational Resources Information Center

    Stanford Research Inst., Menlo Park, CA.

    This final report on the Preliminary Evaluation of Planned Variation in Head Start According to Follow Through Approaches is a detailed account of the field testing and implementation activities performed during the 1969-1972 period, with emphasis on the second and third years. The sections of the report are as follows: I. Introduction; II.…

  15. 76 FR 61379 - Final Recovery Plan, Bexar County Karst Invertebrates

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... Bexar County karst invertebrates were listed as endangered species on December 26, 2000 (65 FR 81419... Fish and Wildlife Service Final Recovery Plan, Bexar County Karst Invertebrates AGENCY: Fish and... Invertebrates under the Endangered Species Act of 1973, as amended (Act). These species occur in Bexar...

  16. Ameliorated GA approach for base station planning

    NASA Astrophysics Data System (ADS)

    Wang, Andong; Sun, Hongyue; Wu, Xiaomin

    2011-10-01

    In this paper, we aim at locating base station (BS) rationally to satisfy the most customs by using the least BSs. An ameliorated GA is proposed to search for the optimum solution. In the algorithm, we mesh the area to be planned according to least overlap length derived from coverage radius, bring into isometric grid encoding method to represent BS distribution as well as its number and develop select, crossover and mutation operators to serve our unique necessity. We also construct our comprehensive object function after synthesizing coverage ratio, overlap ratio, population and geographical conditions. Finally, after importing an electronic map of the area to be planned, a recommended strategy draft would be exported correspondingly. We eventually import HongKong, China to simulate and yield a satisfactory solution.

  17. A new approach to family planning acceptance.

    PubMed

    Shukla, M

    1979-01-01

    The integrated approach to MCH/FP service delivery in the India Population Project is based on the assumption that positive results on family planning acceptance depend upon better health of children already born and a decline in the mortality rate. The Auxiliary Nurse and Midwife (ANM) performs all the family planning activities, distributes a nutritional supplement ("Balahar") to pregnant women, lactating mothers, and children between 6 months and 2 years, and keeps a record of births and deaths in order to convince the village population of the advantages of family planning. In 1975 a house to house inquiry was conducted in one of the affected villages to gather demographic and nutritional information. Analysis revealed that 77 of 82 eligible children were receiving "Balahar". The village birth rate was calculated at 50.3 per thousand and the death rate at 18.5 per thousand. Only 4 out of 233 family planning target couples were current users, and only 11 target couples were favorably disposed to family planning, while 94 were neutral and 128 were hostile. None of the 3 eligible women were receiving prenatal care, and only 1 of the 20 eligible women was receiving postnatal care. PMID:12261422

  18. 76 FR 27086 - Final General Management Plan, Wilderness Management Plan, and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... and Resource Management, Apostle Islands National Lakeshore, Route 1, Box 4, Bayfield, WI 54814... framework for management of the Lakeshore and the Gaylord Nelson Wilderness, including its resources... Van Stappen, Chief of Planning and Resource Management Apostle Islands National Lakeshore, Route...

  19. Guidance manual for managing transportation planning data. Final report

    SciTech Connect

    1997-12-31

    This guidance manual contains procedures for identifying, collecting, organizing, and using data for transportation planning purposes. Specific discussions are included on strategic assessments of data needs; a framework for organizing data, cost effectiveness of data, and the integration and consistency of data. The guidance contained herein will be of interest to planners in state departments of transportation (DOTs) and metropolitan planning organizations (MPOs). Two additional project reports are available on the Internet`s World Wide Web: the agency`s (1) Final Report and (2) Compendium of Data Collection Practices and Sources.

  20. Final Report - Development of a Strategic Energy Plan

    SciTech Connect

    Maracas, Kate; Hooks, Todd

    2006-11-30

    The Agua Caliente Band of Cahuilla Indians was awarded a grant under the U.S. Department of Energy’s (“DOE”) Tribal Energy Program to develop a comprehensive Tribal energy plan. The grant, awarded under DOE’s First Steps program, supported the development of a strategic energy plan that integrates with the Tribe’s overall planning and economic development goals, and aligns with Tribal cultural, social, political, and spiritual values. The Tribe set out to incorporate its energy plan into (i) a broader economic development strategy developed by investigators at the University of California at Riverside, and (ii) the overarching goals for job-creation and wealth-creation that are held by both the Tribe and the surrounding Coachella Valley. With these wide-ranging objectives in mind, the Tribe and its consultant, Red Mountain Energy Partners, engaged in a phased approach to creating the strategic energy plan. As illustrated in Figure 1 below, the proposed approach involved both “serial” and “parallel” activities. The capacity-building component of this approach occurred throughout the duration of the project period.

  1. Two Approaches to Reading Instruction. Final Report.

    ERIC Educational Resources Information Center

    Vilscek, Elaine C.; Cleland, Donald L.

    The extended effects of two instructional approaches, the Coordinated Basal Language Arts Approach and the Integrated Experience Approach to Communication, on pupils' language development at the second- and third-grade levels were investigated. Original subjects were 669 first graders who were pretested for readiness and intelligence. Of these,…

  2. PARETO: A novel evolutionary optimization approach to multiobjective IMRT planning

    SciTech Connect

    Fiege, Jason; McCurdy, Boyd; Potrebko, Peter; Champion, Heather; Cull, Andrew

    2011-09-15

    promise in optimizing the number of beams. Conclusions: This initial evaluation of the evolutionary optimization software tool pareto for IMRT treatment planning demonstrates feasibility and provides motivation for continued development. Advantages of this approach over current commercial methods for treatment planning are many, including: (1) fully automated optimization that avoids human controlled iterative optimization and potentially improves overall process efficiency, (2) formulation of the problem as a true multiobjective one, which provides an optimized set of Pareto nondominated solutions refined over hundreds of generations and compiled from thousands of parameter sets explored during the run, and (3) rapid exploration of the final nondominated set accomplished by a graphical interface used to select the best treatment option for the patient.

  3. Implementing corporate wellness programs: a business approach to program planning.

    PubMed

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials. PMID:7575791

  4. FINAL CLOSURE PLAN SURFACE IMPOUNDMENTS CLOSURE, SITE 300

    SciTech Connect

    Lane, J E; Scott, J E; Mathews, S E

    2004-09-29

    Lawrence Livermore National Laboratory of the University of California (LLNL) operates two Class II surface impoundments that store wastewater that is discharged from a number of buildings located on the Site 300 Facility (Site 300). The wastewater is the by-product of explosives processing. Reduction in the volume of water discharged from these buildings over the past several years has significantly reduced the wastewater storage needs. In addition, the impoundments were constructed in 1984, and the high-density polyethylene (HDPE) geomembrane liners are nearing the end of their service life. The purpose of this project is to clean close the surface impoundments and provide new wastewater storage using portable, above ground storage tanks at six locations. The tanks will be installed prior to closure of the impoundments and will include heaters for allowing evaporation during relatively cool weather. Golder Associates (Golder) has prepared this Final Closure Plan (Closure Plan) on behalf of LLNL to address construction associated with the clean closure of the impoundments. This Closure Plan complies with State Water Resources Control Board (SWRCB) Section 21400 of the California Code of Regulations Title 27 (27 CCR {section}21400). As required by these regulations and guidance, this Plan provides the following information: (1) A site characterization, including the site location, history, current operations, and geology and hydrogeology; (2) The regulatory requirements relevant to clean closure of the impoundments; (3) The closure procedures; and, (4) The procedures for validation and documentation of clean closure.

  5. ENPEP: An integrated approach to energy planning

    SciTech Connect

    Hamilton, B.P.; Cirillo, R.R.; Buehring, W.A.

    1992-01-01

    Many models have been developed to analyze various aspects of the energy system. The Energy and Power Evaluation Program (ENPEP) is a set of microcomputer-based energy planning tools that are designed to provide an integrated analysis capability. ENPEP begins with a macroeconomic analysis, develops an energy demand forecast based on this analysis, carries out an integrated supply/demand analysis for the entire energy system, evaluates the electric system component of the energy system in detail, and determines the impacts of alternative configurations. This approach is an enhancement of existing techniques in that it places emphasis on looking at the electric system as an integral part of the entire energy supply system. Also, it explicitly considers the impacts the power system has on the rest of the energy system and on the economy as a whole.

  6. ENPEP: An integrated approach to energy planning

    SciTech Connect

    Hamilton, B.P.; Cirillo, R.R.; Buehring, W.A.

    1992-09-01

    Many models have been developed to analyze various aspects of the energy system. The Energy and Power Evaluation Program (ENPEP) is a set of microcomputer-based energy planning tools that are designed to provide an integrated analysis capability. ENPEP begins with a macroeconomic analysis, develops an energy demand forecast based on this analysis, carries out an integrated supply/demand analysis for the entire energy system, evaluates the electric system component of the energy system in detail, and determines the impacts of alternative configurations. This approach is an enhancement of existing techniques in that it places emphasis on looking at the electric system as an integral part of the entire energy supply system. Also, it explicitly considers the impacts the power system has on the rest of the energy system and on the economy as a whole.

  7. Evaluation of Resource Acquisition Approaches : Final Report.

    SciTech Connect

    O`Neill, Maura L.; Mortimer, Tom; Palermini, Debbi; Nelson, Kari

    1991-09-12

    Over the last few years, Bonneville has been addressing this need and has developed numerous ways of acquiring resources. Four of these Approaches, the Competitive Acquisition, Billing Credits, and Targeted Acquisition Programs, and the Cowlitz Falls Hydroelectric Project, were the subject of this evaluation project. Each Approach is currently in different stages of a process, and Bonneville felt it was an appropriate time that an evaluation be conducted. The purpose of this evaluation is to analyze the various Approaches` processes, to learn what`s working and what`s not, and to offer recommendations as to how Bonneville might improve their resources acquisition efforts. The evaluation was conducted with no preconceived biases.

  8. Liquid effluent retention facility final-status groundwater monitoring plan

    SciTech Connect

    Sweeney, M.D.; Chou, C.J.; Bjornstad, B.N.

    1997-09-01

    The following sections describe the groundwater-monitoring program for the Liquid Effluent Retention Facility (LERF). The LERF is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The LERF is included in the {open_quotes}Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit WA890008967{close_quotes}, (referred to herein as the Permit) (Ecology 1994) and is subject to final-status requirements for groundwater monitoring (WAC 173-303-645). This document describes a RCRA/WAC groundwater detection-monitoring program for groundwater in the uppermost aquifer system at the LERF. This plan describes the LERF monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the LERF. This plan will be used to meet the groundwater monitoring requirements from the time the LERF becomes part of the Permit and through the post-closure care period, until certification of final closure.

  9. Environmental Education - A Problem Approach. Final Report.

    ERIC Educational Resources Information Center

    Presnell, Richard W.

    The envrionmental education project, "A Problem Approach," was designed to involve University faculty and community leaders in a number of goals. They attempted to produce a series of audio-taped slide presentations designed to develop a working level of environmental literacy in the project participants and in those people who subsequently…

  10. 75 FR 70670 - Final Vehicle Safety Rulemaking and Research Priority Plan 2010-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... National Highway Traffic Safety Administration 49 CFR Part 571 Final Vehicle Safety Rulemaking and Research... availability of the Final Vehicle Safety Rulemaking and Research Priority Plan 2010-2013 (Priority Plan) in Docket No. NHTSA-2009-0108. This Priority Plan is an update to the Final Vehicle Safety Rulemaking...

  11. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Monocacy National Battlefield

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... General Management Plan for Monocacy National Battlefield. The plan will provide guidance to park... National Park Service Final Environmental Impact Statement for the General Management Plan; Monocacy... Availability of the Final Environmental Impact Statement for the General Management Plan for Monocacy...

  12. 77 FR 39253 - Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan, Denali...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... NATIONAL PARK SERVICE Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan... of the Final Environmental Impact Statement for the Denali Park Road Vehicle Management Plan. SUMMARY... Denali Park Road Vehicle Management Plan (Plan/FEIS), for Denali National Park and Preserve, Alaska....

  13. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... National Park Service Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement... Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan, Biscayne National... Impact Statement for the Coral Reef Restoration Plan (Plan/FEIS) for Biscayne National Park, Florida....

  14. Plan for advanced microelectronics processing technology application. Final report

    SciTech Connect

    Goland, A.N.

    1990-10-01

    The ultimate objective of the tasks described in the research agreement was to identify resources primarily, but not exclusively, within New York State that are available for the development of a Center for Advanced Microelectronics Processing (CAMP). Identification of those resources would enable Brookhaven National Laboratory to prepare a program plan for the CAMP. In order to achieve the stated goal, the principal investigators undertook to meet the key personnel in relevant NYS industrial and academic organizations to discuss the potential for economic development that could accompany such a Center and to gauge the extent of participation that could be expected from each interested party. Integrated of these discussions was to be achieved through a workshop convened in the summer of 1990. The culmination of this workshop was to be a report (the final report) outlining a plan for implementing a Center in the state. As events unfolded, it became possible to identify the elements of a major center for x-ray lithography on Lone Island at Brookhaven National Laboratory. The principal investigators were than advised to substitute a working document based upon that concept in place of a report based upon the more general CAMP workshop originally envisioned. Following that suggestion from the New York State Science and Technology Foundation, the principals established a working group consisting of representatives of the Grumman Corporation, Columbia University, the State University of New York at Stony Brook, and Brookhaven National Laboratory. Regular meetings and additional communications between these collaborators have produced a preproposal that constitutes the main body of the final report required by the contract. Other components of this final report include the interim report and a brief description of the activities which followed the establishment of the X-ray Lithography Center working group.

  15. Offpost operable unit remedial investigation/endangerment assessment/feasibility study, draft final work plan

    SciTech Connect

    1989-12-01

    This document presents the scope of work for additional data collection activities and interpretive reports to be performed in the off-post operable unit (OU) for preparation of: (1) Addendum to the final remedial investigation report; (2)` Revision of the draft final endangerment assessment/feasibility study. The plan is divided into the following sections: (1) Requirements for the RI addendum - technical approach and data collection program for the RI addendum - technical approach and data collection program for ground water, soil, sediment, biota, air; (2) Revision of the endagerment assessment - items that need to be reevaluated; (3) Revision of the feasibility study - evaluation of different media and ARAR`s development of remedial alternatives; (4) Schedule and description of deliverables. Appendix a contains a detailed approach for the 96th avenue risk assessment.

  16. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  17. Planning and Design: A Systems Approach.

    ERIC Educational Resources Information Center

    Bozeman, William C.; Clements, Mary A.

    1981-01-01

    Explains "purpose design," a planning and problem-solving strategy involving determination of planning purposes, generation and selection of solutions, specification of solution details, implementation, and evaluation. Describes the application of purpose design to the planning of an alumni association at Black Hawk College, a community college in…

  18. 78 FR 25762 - Notice of Availability of the Final Trail Management Plan/Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... the restoration and sustainability of the trail system for the future. Of the actions that are... management related to the restoration of existing trails, planning and design for new trails and trail... National Park Service Notice of Availability of the Final Trail Management Plan/Final Environmental...

  19. Use of quantitative approaches in plan development.

    PubMed

    Palmer, B Z

    1978-04-01

    Health Planning as mandated by P.L. 93-641 requires considerable emphasis on technical procedures, especially during the development of the 5 year Health Systems Plans (HSP) and the one year Annual Implementation Plans (AIP). In addition, the State Health Plans and the State Medical Facilities Plans, which are to be developed in part on the basis of HSPs and AIPs of the Health Systems Agencies (HSAs) in each state, are expected to have solid quantitative documentation. The gap between these expectations and the state of the art reality are reviewed in this article. PMID:10307191

  20. A Comprehensive Approach to Emergency Planning

    ERIC Educational Resources Information Center

    Worsley, Tracy L.; Beckering, Don

    2007-01-01

    It is essential that the traditional emergency management structure be used as a framework for higher education emergency planning. The four phases of emergency management should be reflected in the architecture of all planning efforts. These include "preparedness," "response," "mitigation," and "recovery." All of the phases overlap, are…

  1. Forest Resource Management Plans--A Landowner-Oriented Approach.

    ERIC Educational Resources Information Center

    Straka, Thomas J.

    1993-01-01

    Describes a teaching approach that uses actual landowners and their forest lands to create real world management planning experiences for senior forestry students. Using land currently managed by natural resource professionals allows the instructor to compare student plans with professionally prepared plans. (MDH)

  2. Final-Approach-Spacing Subsystem For Air Traffic

    NASA Technical Reports Server (NTRS)

    Davis, Thomas J.; Erzberger, Heinz; Bergeron, Hugh

    1992-01-01

    Automation subsystem of computers, computer workstations, communication equipment, and radar helps air-traffic controllers in terminal radar approach-control (TRACON) facility manage sequence and spacing of arriving aircraft for both efficiency and safety. Called FAST (Final Approach Spacing Tool), subsystem enables controllers to choose among various levels of automation.

  3. 76 FR 68503 - Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park, Idaho, Montana...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... the Preferred Alternative as Alternative 8, a one-year plan to allow oversnow vehicle use in the park... National Park Service Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park... the Final Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park....

  4. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... National Highway Traffic Safety Administration 49 CFR Part 571 Final Vehicle Safety Rulemaking and Research... NHTSA Vehicle Safety and Fuel Economy Rulemaking and Research Priority Plan 2011-2013 (Priority Plan) in Docket No. NHTSA-2009-0108. This Priority Plan is an update to the Final Vehicle Safety Rulemaking...

  5. 75 FR 37790 - Lauryl Sulfate Salts; Antimicrobial Registration Review Final Work Plan and Proposed Registration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... AGENCY Lauryl Sulfate Salts; Antimicrobial Registration Review Final Work Plan and Proposed Registration.... SUMMARY: This notice announces the availability of EPA's final work plan and proposed registration review... with the posting of a summary document, containing a preliminary work plan, for public comment....

  6. Customer-focused planning: Demonstration project summaries. Final report

    SciTech Connect

    George, S.S.

    1992-12-01

    To succeed in the increasingly competitive and dynamic markets in which they operate, electric utilities are focusing ever greater attention on understanding and meeting customer needs. EPRI`s Customer Focused Planning (CFP) project was established to develop concepts and tools that will help utilities enhance their commitment to customer service. The project team conducted a series of interviews and meetings with participating utilities to collaboratively implement crucial steps in the CFP process. Although there is no unique set of tools or single management approach for improving product and service delivery, customer-focused companies have at least five ideals in common. They (1) define goals and objectives in concrete terms, (2) extend the planning boundaries of the organization to include all members of the energy services infrastructure, (3) painstakingly link functional activities directly to customer needs, (4) incorporate the customer`s voice in new product/ service design, and (5) align performance measures with customer needs. In addition, customer-focused companies use a variety of methods to improve customer satisfaction and company performance. These methods include conducting market research, developing market processes such as demand-side management contracting or bidding to reveal customer preferences, and involving customers more directly in the planning process. This report summarizes two brief demonstration projects conducted as part of EPRI`s CFP project, one at Commonwealth Edison Company (CECo) and one at PSI Energy. The CECo project emphasized developing customer-focused performance measures for telephone inquiries. The PSI Energy project involved a one-day workshop underscoring two important CFP elements-understanding customer wants and explicitly linking those wants to utility activities.

  7. RTSTEP regional transportation simulation tool for emergency planning - final report.

    SciTech Connect

    Ley, H.; Sokolov, V.; Hope, M.; Auld, J.; Zhang, K.; Park, Y.; Kang, X.

    2012-01-20

    Large-scale evacuations from major cities during no-notice events - such as chemical or radiological attacks, hazardous material spills, or earthquakes - have an obvious impact on large regions rather than on just the directly affected area. The scope of impact includes the accommodation of emergency evacuation traffic throughout a very large area; the planning of resources to respond appropriately to the needs of the affected population; the placement of medical supplies and decontamination equipment; and the assessment and determination of primary escape routes, as well as routes for incoming emergency responders. Compared to events with advance notice, such as evacuations based on hurricanes approaching an affected area, the response to no-notice events relies exclusively on pre-planning and general regional emergency preparedness. Another unique issue is the lack of a full and immediate understanding of the underlying threats to the population, making it even more essential to gain extensive knowledge of the available resources, the chain of command, and established procedures. Given the size of the area affected, an advanced understanding of the regional transportation systems is essential to help with the planning for such events. The objectives of the work described here (carried out by Argonne National Laboratory) is the development of a multi-modal regional transportation model that allows for the analysis of different evacuation scenarios and emergency response strategies to build a wealth of knowledge that can be used to develop appropriate regional emergency response plans. The focus of this work is on the effects of no-notice evacuations on the regional transportation network, as well as the response of the transportation network to the sudden and unusual demand. The effects are dynamic in nature, with scenarios changing potentially from minute to minute. The response to a radiological or chemical hazard will be based on the time-delayed dispersion of

  8. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    SciTech Connect

    Lim, E. Y.; Miller, W. J.; Parkinson, W. J.; Ritzman, R. L.; vonHerrmann, J. L.; Wood, P. J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix.

  9. The NASA planning process, appendix D. [as useful planning approach for solving urban problems

    NASA Technical Reports Server (NTRS)

    Annett, H. A.

    1973-01-01

    The planning process is outlined which NASA used in making some fundamental post-Apollo decisions concerning the reuseable space shuttle and the orbiting laboratory. It is suggested that the basic elements and principles of the process, when combined, form a useful planning approach for solving urban problems. These elements and principles are defined along with the basic strengths of the planning model.

  10. Program planning: a total quality approach.

    PubMed

    Dees, J P; Garcia, M A

    1995-05-01

    1. Deming's concepts for total quality management/continuous quality improvement are the basis for a tool occupational health nurses can apply in health program planning. 2. The program planning model provides a framework for systematically implementing, evaluating, and improving products and services. In the current business environment, this is critical to success and to demonstration of the value of occupational health services to a company. 3. A case study describing implementation of a medical case management program illustrates application of the model in a real life situation. PMID:7766248

  11. Energy planning for development - needs and approaches

    SciTech Connect

    Mubayi, V

    1981-01-01

    The capability of developing countries to carry out comprehensive national energy planning is examined. The analytical methods or models constructed for analyzing the energy system have to take into account the specific context in which they are built to address issues of interest to development planners. Issues discussed are resource development and technology research, energy equity considerations to all peoples in a nation, the pricing policy, and the balance of payments considerations. The impartance of the availability of adequate skilled personnel and training programs to impart the requisite skill necessary to carry out the planning is discussed. Various surveys were conducted to determine the training needs for energy planners in developing countries. (MCW)

  12. An optimisation approach to multiprobe cryosurgery planning.

    PubMed

    Giorgi, Giovanni; Avalle, Leopoldo; Brignone, Massimo; Piana, Michele; Caviglia, Giacomo

    2013-01-01

    In cryosurgery operations, tumoural cells are killed by means of a freezing procedure realised with the insertion of cryoprobes in the diseased tissue. Cryosurgery planning aims at establishing the best values for operation parameters like number and position of the probes or temperature and duration of the freezing process. Here, we present an application of ant colony optimisation (ACO) to cryosurgery planning, whereby the ACO cost function is computed by numerically solving several direct Stefan problems in biological tissues. The method is validated in the case of a 2D phantom of a prostate cross section. PMID:22224977

  13. Tax treatment of cafeteria plans. Internal Revenue Service (IRS), Treasury. Final regulations.

    PubMed

    2000-03-23

    This document contains final regulations relating to section 125 cafeteria plans. The final regulations clarify the circumstances under which a section 125 cafeteria plan election may be changed. The final regulations permit an employer to allow a section 125 cafeteria plan participant to revoke an existing election and make a new election during a period of coverage for accident or health coverage or group-term life insurance coverage. PMID:11010645

  14. Planning for Growth: A Nontraditional Approach

    ERIC Educational Resources Information Center

    Hagemeyer, Richard H.

    1975-01-01

    Central Piedmont Community College (North Carolina) has sought an alternative to building new campuses to meet the increasing demands for its services. Various non-traditional delivery systems, including satellite centers, cable TV, teleconference networks, and strengthened off-campus audiovisual and library support services, are planned to expand…

  15. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    1999-09-09

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP.

  16. Planning for Change. [Final Report and Training Package].

    ERIC Educational Resources Information Center

    Hawk, Kim; Herr, Linda; Merk, Dan; Shafer, Dehra; Sherow, Sheila; Weinberger, JoAnn

    This document contains materials about and from the Planning for Change (PfC) project, which was conducted to accomplish the following objectives: (1) further develop and document a comprehensive community planning process across Pennsylvania's workforce investment board (WIB) regions; (2) pilot the comprehensive planning project; and (3) expand…

  17. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    1999-12-14

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

  18. 75 FR 28287 - Final Plan for Fiscal Year 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-20

    ... December 1, 2009 (74 FR 62821). The deadline for submitting comments on the Proposed Plan was January 15... FY 2010 Proposed Plan OJJDP published its Proposed Plan for FY 2010 in the Federal Register (74 FR... reduction of negative behavior in elementary and middle school youth (e.g., truancy, bullying) and...

  19. Simulator evaluation of the Final Approach Spacing Tool

    NASA Technical Reports Server (NTRS)

    Davis, Thomas J.; Erzberger, Heinz; Green, Steven M.

    1990-01-01

    The design and simulator evaluation of an automation tool for assisting terminal radar approach controllers in sequencing and spacing traffic onto the final approach course is described. The automation tool, referred to as the Final Approach Spacing Tool (FAST), displays speed and heading advisories for arrivals and sequencing information on the controller's radar display. The main functional elements of FAST are a scheduler that schedules and sequences the traffic, a four-dimensional trajectory synthesizer that generates the advisories, and a graphical interface that displays the information to the controller. FAST has been implemented on a high-performance workstation. It can be operated stand-alone in the terminal radar approach control (TRACON) facility or as an element of a system integrated with automation tools in the Air Route Traffic Control Center). Simulation results show that FAST significantly reduced controller workload and demonstrated a potential for an increase in landing rate.

  20. Water Resources Planning under Uncertainty: A "Real Options" Approach

    NASA Astrophysics Data System (ADS)

    Jeuland, M. A.; Whittington, D.

    2011-12-01

    This research develops a real options approach for planning new water resources developments, in infrastructure construction and system operation, under uncertainty. The approach treats the planning problem as a series of staged decisions - the selection of new projects; their scale, timing and sequencing; and finally their operating rules - each of which is characterized by varying levels of irreversibility. The performance of different configurations of the system is then assessed along the various dimensions of the decision space, using simulation methods. The methodology is then made operational using an existing hydrological simulation model that can be used to study the example of hydropower development options in the Blue Nile in Ethiopia. The model includes physical linkages between climate change and system hydrology, and allows users to test the sensitivity of the basin-wide economic consequences of dams, which consist of energy generation, changes in irrigation crop-water demand, the value of flood control, and other basin-wide impacts, to climate change or changes in runoff, as well as to other uncertainties. The analysis shows that, from an economic perspective, there is no single optimal system configuration across a range of future climate conditions deemed plausible for this basin. For example, small infrastructures perform best in scenarios with reduced runoff into the river, whereas large ones are best when runoff increases. The real options framework therefore becomes useful for helping to identify configurations that are both more robust to poor outcomes and still contain sufficient flexibility to capture high upside benefits should favorable future conditions arise. The framework could readily be extended to explore a range of features that could be usefully built into water resources projects more generally, to improve the long-term economic performance of such investments.

  1. Final Consolidated action plan to Tiger Team. Volume 2

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implemenation by Sandia and monitoring by DOE. This volume (2) contains information and corrective action plans pertaining to safety and health and management practices.

  2. 21. Southern approach span plan and elevation views for pier ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Southern approach span plan and elevation views for pier and abutment structural changes required after flood of December 1955 on Moody Bridge. - Moody Bridge, Spanning South Fork Eel River, Garberville, Humboldt County, CA

  3. 26. Southern approach span showing detail plan, elevation, and existing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Southern approach span showing detail plan, elevation, and existing views for pier and abutment structural changes required after flood of December 1955. - Moody Bridge, Spanning South Fork Eel River, Garberville, Humboldt County, CA

  4. ANCHOR SETTING PLAN FOR TYPICAL APPROACH SPANS AND ELEVATION OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ANCHOR SETTING PLAN FOR TYPICAL APPROACH SPANS AND ELEVATION OF BENT CAPS FOR APALACHICOLA RIVER BRIDGE, SHEET 5509-M1 - Apalachicola River Bridge, State Route 20 spanning the Apalachicola River, Blountstown, Calhoun County, FL

  5. ANCHOR SETTING PLAN, WITH DETAILS, FOR STEEL BENTS AT APPROACH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ANCHOR SETTING PLAN, WITH DETAILS, FOR STEEL BENTS AT APPROACH SPANS FOR APALACHICOLA RIVER BRIDGE, SHEET 5509-M2 - Apalachicola River Bridge, State Route 20 spanning the Apalachicola River, Blountstown, Calhoun County, FL

  6. General Education Assessment Plan: A Four-Tiered Approach

    ERIC Educational Resources Information Center

    McLawhon, Ryan; Phillips, Loraine H.

    2013-01-01

    Planning is possibly the most important step of the assessment process. This article presents a four-tiered approach to designing and implementing a general education institutional assessment plan. Categorizing the measures you use to assess established learning outcomes helps you prioritize your general education assessment initiatives and keep…

  7. Optimization approaches to volumetric modulated arc therapy planning.

    PubMed

    Unkelbach, Jan; Bortfeld, Thomas; Craft, David; Alber, Markus; Bangert, Mark; Bokrantz, Rasmus; Chen, Danny; Li, Ruijiang; Xing, Lei; Men, Chunhua; Nill, Simeon; Papp, Dávid; Romeijn, Edwin; Salari, Ehsan

    2015-03-01

    Volumetric modulated arc therapy (VMAT) has found widespread clinical application in recent years. A large number of treatment planning studies have evaluated the potential for VMAT for different disease sites based on the currently available commercial implementations of VMAT planning. In contrast, literature on the underlying mathematical optimization methods used in treatment planning is scarce. VMAT planning represents a challenging large scale optimization problem. In contrast to fluence map optimization in intensity-modulated radiotherapy planning for static beams, VMAT planning represents a nonconvex optimization problem. In this paper, the authors review the state-of-the-art in VMAT planning from an algorithmic perspective. Different approaches to VMAT optimization, including arc sequencing methods, extensions of direct aperture optimization, and direct optimization of leaf trajectories are reviewed. Their advantages and limitations are outlined and recommendations for improvements are discussed. PMID:25735291

  8. Optimization approaches to volumetric modulated arc therapy planning

    SciTech Connect

    Unkelbach, Jan Bortfeld, Thomas; Craft, David; Alber, Markus; Bangert, Mark; Bokrantz, Rasmus; Chen, Danny; Li, Ruijiang; Xing, Lei; Men, Chunhua; Nill, Simeon; Papp, Dávid; Romeijn, Edwin; Salari, Ehsan

    2015-03-15

    Volumetric modulated arc therapy (VMAT) has found widespread clinical application in recent years. A large number of treatment planning studies have evaluated the potential for VMAT for different disease sites based on the currently available commercial implementations of VMAT planning. In contrast, literature on the underlying mathematical optimization methods used in treatment planning is scarce. VMAT planning represents a challenging large scale optimization problem. In contrast to fluence map optimization in intensity-modulated radiotherapy planning for static beams, VMAT planning represents a nonconvex optimization problem. In this paper, the authors review the state-of-the-art in VMAT planning from an algorithmic perspective. Different approaches to VMAT optimization, including arc sequencing methods, extensions of direct aperture optimization, and direct optimization of leaf trajectories are reviewed. Their advantages and limitations are outlined and recommendations for improvements are discussed.

  9. Implementation planning for industrial energy conservation: approach and methodology

    SciTech Connect

    Alston, T.G.; Falk, G.; Grogan, P.J.; Katz, D.; Tatar, J.

    1981-01-01

    Details of an industry-specific Conservation Technology Implementation Branch implementation plan is described in detail. CTIB has conducted implementation planning in the steel, pulp/paper, and agriculture/food processing industries, but in FY 1981, CTIB plans to conduct planning for the chemicals, petroleum refining, aluminum, glass, cement, and textile industries. Guidelines are presented for each contractor for each industry toward a common methodology in terms of approach, areas of analysis, assumptions, and reporting. The major parts of the CTIB plan are: an implementation study consisting of technology selection, market demand analysis, and policy analysis, and a plan consisting of a detailed description and schedule of future CTIB actions, followed by a recommended system for monitoring market results when the plan is implemented. (MCW)

  10. Final Report for the Soboba Strategic Tribal Energy Planning Project

    SciTech Connect

    Miller, Kim

    2013-09-17

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  11. Cluster approach allows budgeting, planning with DRGs.

    PubMed

    Grimaldi, P L

    1984-01-01

    Measuring costs and revenues on a diagnosis related group (DRG) basis allows health care managers to define product lines, identify market shares, and examine the effects of case mix and physician behavior on profitability. It also enables public agencies to predict bed needs and evaluate certificate-of-need applications. The large number of DRGs, however, and other managerial considerations may discourage the use of DRG-based budgeting and planning. To save time and enhance data usefulness, financial officers may consolidate the DRGs into fewer groups. Revenue, for example, can be estimated by grouping the DRGs into 23 major diagnostic categories or by clustering them according to cost weight or into one group. Comparisons of payment rates and costs will identify the DRGs that lose money and will determine whether departmental costs are excessive. Strategic planning units formed from the 468 DRGs will help health care managers analyze and project performance. Product lines for this purpose may be clustered according to major diagnostic category, physician specialty, or clinical department. Since a potentially enormous amount of DRG-based clinical and financial information could be generated, hospitals should create data committees to ensure that managers receive only the information they need. PMID:10310693

  12. 75 FR 47826 - Final General Management Plan/Environmental Impact Statement, Cumberland Gap National Historical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... National Park Service Final General Management Plan/Environmental Impact Statement, Cumberland Gap National... Management Plan and Environmental Impact Statement for the Cumberland Gap National Historical Park, Kentucky... Cumberland Gap National Historical Park, the Final GMP/EIS describes the NPS preferred...

  13. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... National Park Service Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand... Availability of a Record of Decision on the Final Environmental Impact Statement for the Fire Management Plan.... 4332(2)(C), the National Park Service announces the availability of the Record of Decision for the...

  14. 76 FR 62089 - General Management Plan/Abbreviated Final Environmental Impact Statement, New River Gorge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ...The National Park Service (NPS) announces the availability of the Abbreviated Final Environmental Impact Statement for the General Management Plan (GMP/EIS) for New River Gorge National River, West Virginia. When approved, the plan will provide guidance to park management for administration, development, and interpretation of park resources over the next 20 years. The Abbreviated Final GMP/EIS......

  15. 2006 Long Range Development Plan Final Environmental ImpactReport

    SciTech Connect

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been reduced since the Notice of Preparation for

  16. Designing Training Plans for Distributive Education. Final Report.

    ERIC Educational Resources Information Center

    Syhlman, William D.

    These distributive education training and development plans for secondary-level programs provide lists of competencies a student needs to hold a job in sales and marketing occupational areas. The design of the training plans is based on a "pyramid" which incorporates the following five sections or levels of competencies (from general to specific):…

  17. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document is a compilation of different issues identified by the Tiger Teams at the several locations of the Sandia National Laboratory. In this volume there are findings/concerns and the resultant responses and planned actions for these issues. Also included are the schedules and costs for the planned actions.

  18. The indexed time table approach for planning and acting

    NASA Technical Reports Server (NTRS)

    Ghallab, Malik; Alaoui, Amine Mounir

    1989-01-01

    A representation is discussed of symbolic temporal relations, called IxTeT, that is both powerful enough at the reasoning level for tasks such as plan generation, refinement and modification, and efficient enough for dealing with real time constraints in action monitoring and reactive planning. Such representation for dealing with time is needed in a teleoperated space robot. After a brief survey of known approaches, the proposed representation shows its computational efficiency for managing a large data base of temporal relations. Reactive planning with IxTeT is described and exemplified through the problem of mission planning and modification for a simple surveying satellite.

  19. The agricultural approach to rural family planning in the Philippines.

    PubMed

    Flavier, J M

    1990-12-01

    Overly technical terminology and excessive use of lectures impede effective communication and teaching of family planning in the philippines. To achieve better results in information dissemination, especially in rural areas, the author provides a simple, effective, and interactive approach. The clearly-defined objective of identifying what family planning is and how it works is achieved through the use of analogies between farming and human sexual development. These analogies are jointly-developed in the field by groups of family planning workers and 8-10 men and women from the community. The farmers begin the group process by educating the family planning workers about their local farming practices. The workers then develop parallels between farming and the desired family planning messages. Once initiated, farmers are encouraged to develop and share their own parallels, by they with plants, farm animals, beliefs, or household articles. Better understanding, acceptance, and continuation rates will result from this voluntary, interactive approach. PMID:12283886

  20. APOLLO 11: Landing the Eagle - The Final Approach

    NASA Technical Reports Server (NTRS)

    1974-01-01

    APOLLO 11: Landing the Eagle - The Final Approach. The dramatic final 60 seconds before touchdown. From the film documentary 'APOLLO 11:'The Eagle Has Landed'', part of a documentary series on the APOLLO missions made in the early '70's and narrated by Burgess Meredith. APOLLO 11: First manned lunar landing and return to Earth with Neil A. Armstrong, Michael Collins, and Edwin E. Aldrin. Landed in the Sea of Tranquilityon July 20, 1969; deployed TV camera and EASEP experiments, performed lunar surface EVA, returned lunar soil samples. Mission Duration 195 hrs 18 min 35sec

  1. Planning a Whole-School Approach to STEM

    ERIC Educational Resources Information Center

    Knowles, Becca

    2014-01-01

    An interdisciplinary approach to STEM has huge benefits in terms of engaging young people and increasing their awareness of the opportunities that STEM skills can provide. However, planning a whole-school approach to STEM education can be challenging. This article gives case studies of two recent projects in STEM education and introduces two…

  2. A planning approach for agricultural watersheds using precision conservation

    Technology Transfer Automated Retrieval System (TEKTRAN)

    This brief article, written for a non-technical audience, discusses a recently-developed approach for watershed planning and nutrient reduction. The approach can help local stakeholders identify conservation practices that are locally preferred and determine how those practices can be distributed ac...

  3. The Team Approach to Planning a College Science Building.

    ERIC Educational Resources Information Center

    Yarbrough, David B.

    In considering the team approach to architectural service, emphasis is given to the advantages of many specialists working together to solve complex building problems. An actual use of the team approach is described to illustrate how Caudill, Rowlett and Scott Architects solved the problems in planning a science building for Colorado College. The…

  4. Approach trajectory planning system for maximum concealment

    NASA Technical Reports Server (NTRS)

    Warner, David N., Jr.

    1986-01-01

    A computer-simulation study was undertaken to investigate a maximum concealment guidance technique (pop-up maneuver), which military aircraft may use to capture a glide path from masked, low-altitude flight typical of terrain following/terrain avoidance flight enroute. The guidance system applied to this problem is the Fuel Conservative Guidance System. Previous studies using this system have concentrated on the saving of fuel in basically conventional land and ship-based operations. Because this system is based on energy-management concepts, it also has direct application to the pop-up approach which exploits aircraft performance. Although the algorithm was initially designed to reduce fuel consumption, the commanded deceleration is at its upper limit during the pop-up and, therefore, is a good approximation of a minimum-time solution. Using the model of a powered-lift aircraft, the results of the study demonstrated that guidance commands generated by the system are well within the capability of an automatic flight-control system. Results for several initial approach conditions are presented.

  5. A global path planning approach for redundant manipulators

    NASA Technical Reports Server (NTRS)

    Seereeram, Sanjeev; Wen, J.

    1993-01-01

    A new approach for global path planning of redundant manipulators is proposed. It poses the path planning problem as a finite time nonlinear control problem. The solution is found by a Newton-Raphson type algorithm. This technique is capable of handling various goal task descriptions as well as incorporating both joint and task space constraints. The algorithm has shown promising preliminary results in planning joint path sequences for 3R and 4R planar robots to meet Cartesian tip tracking and goal endpoint planning. It is robust with respect to local path planning problems such as singularity considerations and local minimum problems. Repetitive joint path solutions for cyclic end-effector tasks are also generated. Eventual goals of this work include implementation on full spatial robots, as well as provision of an interface for supervisory input to aid in path planning for more complex problems.

  6. Least-cost utility planning consumer participation manual. [Final report

    SciTech Connect

    Mitchell, C.; Wellinghoff, J.; Goldberg, F.

    1989-12-31

    This manual is designed to provide guidance to state consumer advocates and other state consumer groups interested in either initiating and/or participating in an Least-Cost Utility Planning (LCUP) process in their state. Least cost utility planning examined primarily as a regulatory framework to be implemented by an appropriate state authority -- usually the public utility commission -- for the benefit of the state`s citizens and electric utility customers. LCUP is also a planning process to be used by investor owned and public utilities to select, support and justify future expenditures in resource additions. This manual is designed as a ``How-To`` manual for implementing and participating in a statewide LCUP process. Its goal is to guide the reader through the LCUP maze so that meaningful, forward-looking, and cost minimizing electric utility planning can be initiated and sustained in your state.

  7. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implementation by Sandia and monitoring by DOE. This volume (I) contains the findings and actions concerning the environment. Tables 4.2 and 4.7 summarize the annual costs estimated for completing the actions. The total costs for completion of all the actions are estimated to be $283 million over a 12 year period; the majority of the actions to be completed and costs incurred in the first five years. Resources are provided from DOE-ER/WM, the DOE/DP landlord funds (one time, physical fixes), and from the Sandia Indirect Budget.

  8. Licensing plan for UMTRA project disposal sites. Final [report

    SciTech Connect

    Not Available

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC`s acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information.

  9. Proliferation as a framework for adaptive planning. Final report

    SciTech Connect

    Adkins, M.A.

    1993-02-22

    Throughout the forty years of the cold war, the military proficiently demonstrated planning, exercising, and employing against weapons of mass destruction -- specifically nuclear weapons. However, this planning has never targeted the spread of those weapons. The four stages of proliferation (supply, demand, indigenous, threatening) provide a framework for using the adaptive planning concept and identifying proactive military objectives. The existence of nuclear technology, command and control of the weapons of mass destruction, associated moral issues, or the value of assured deterrence between two nuclear weapon states are not addressed. Weapons of mass destruction are the example used to examine the stages of proliferation. Once planning for proliferation of weapons of 'mass destruction has been proven effective, this framework can be applied to other types of proliferants such as narcotic trafficking and transfer of conventional/high technology arms.

  10. 76 FR 9596 - General Management Plan, Final Environmental Impact Statement, Cedar Creek and Belle Grove...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... Final Environmental Impact Statement for the General Management Plan (Final GMP/EIS) for Cedar Creek and... Final GMP/EIS responds to, and incorporates, agency and public comments received on the Draft GMP/EIS.... Copies of the Draft EIS/GMP were available at the park office, by request, and on the NPS...

  11. An integrated mission planning approach for the Space Exploration Initiative

    SciTech Connect

    Coomes, E.P.; Dagle, J.E.; Bamberger, J.A.; Noffsinger, K.E.

    1992-08-01

    This report discusses a fully integrated energy-based approach to mission planning which is needed if the Space Exploration Initiative (SEI) is to succeed. Such an approach would reduce the number of new systems and technologies requiring development. The resultant horizontal commonality of systems and hardware would reduce the direct economic impact of SEI and provide an economic benefit by greatly enhancing our international technical competitiveness through technology spin-offs and through the resulting early return on investment. Integrated planning and close interagency cooperation must occur if the SEI is to achieve its goal of expanding the human presence into the solar system and be an affordable endeavor. An energy-based mission planning approach gives each mission planner the needed power, yet preserves the individuality of mission requirements and objectives while reducing the concessions mission planners must make. This approach may even expand the mission options available and enhance mission activities.

  12. An integrated mission planning approach for the space exploration initiative

    SciTech Connect

    Coomes, E.P.; Dagle, J.E.; Bamberger, J.A.; Noffsinger, K.E.

    1992-01-01

    A fully integrated energy-based approach to mission planning is needed if the Space Exploration Initiative (SEI) is to succeed. Such an approach would reduce the number of new systems and technologies requiring development. The resultant horizontal commonality of systems and hardware would reduce the direct economic impact of SEI and provide an economic benefit by greatly enhancing our international technical competitiveness through technology spin-offs and through the resulting early return on investment. Integrated planning and close interagency cooperation must occur if the SEI is to achieve its goal of expanding the human presence into the solar system and be an affordable endeavor. An energy-based mission planning approach gives each mission planner the needed power, yet preserves the individuality of mission requirements and objectives while reducing the concessions mission planners must make. This approach may even expand the mission options available and enhance mission activities.

  13. Queuing network approach for building evacuation planning

    NASA Astrophysics Data System (ADS)

    Ishak, Nurhanis; Khalid, Ruzelan; Baten, Md. Azizul; Nawawi, Mohd. Kamal Mohd.

    2014-12-01

    The complex behavior of pedestrians in a limited space layout can explicitly be modeled using an M/G/C/C state dependent queuing network. This paper implements the approach to study pedestrian flows through various corridors in a topological network. The best arrival rates and their impacts to the corridors' performances in terms of the throughput, blocking probability, expected number of occupants in the system and expected travel time were first measured using the M/G/C/C analytical model. These best arrival rates were then fed to its Network Flow Programming model to find the best arrival rates to source corridors and routes optimizing the network's total throughput. The analytical results were then validated using a simulation model. Various results of this study can be used to support the current Standard Operating Procedures (SOP) to efficiently and safely evacuate people in emergency cases.

  14. Wildlife Protection, Mitigation, and Enhancement Plan, Palisades Project: Final Report.

    SciTech Connect

    Meuleman, G. Allyn

    1986-11-01

    Under direction of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 and the subsequent Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, projects have been developed in Idaho and Wyoming to mitigate the losses of wildlife habitat and annual production due to the development and operation of the Palisades Project. A modified Habitat Evaluation Procedure (HEP) was used to assess the benefits of the preferred mitigation plan to wildlife. The interagency work group used the target species Habitat Units (HU's) lost with inundation of the reservoir area as a guideline during the mitigation planning process, while considering needs of wildlife in eastern Idaho and western Wyoming. A total of 37,068 HU's were estimated to be lost as a result of the inundation of the Palisades Reservoir area. Through a series of protection/enhancement projects, the preferred mitigation plan will provide benefits of an estimated 37,066 HU's. Target species to be benefited by this mitigation plan include bald eagle, mule deer, elk, mallard, Canada goose, mink, yellow warbler, black-capped chickadee, ruffed grouse, and peregrine falcon.

  15. A Final Approach Trajectory Model for Current Operations

    NASA Technical Reports Server (NTRS)

    Gong, Chester; Sadovsky, Alexander

    2010-01-01

    Predicting accurate trajectories with limited intent information is a challenge faced by air traffic management decision support tools in operation today. One such tool is the FAA's Terminal Proximity Alert system which is intended to assist controllers in maintaining safe separation of arrival aircraft during final approach. In an effort to improve the performance of such tools, two final approach trajectory models are proposed; one based on polynomial interpolation, the other on the Fourier transform. These models were tested against actual traffic data and used to study effects of the key final approach trajectory modeling parameters of wind, aircraft type, and weight class, on trajectory prediction accuracy. Using only the limited intent data available to today's ATM system, both the polynomial interpolation and Fourier transform models showed improved trajectory prediction accuracy over a baseline dead reckoning model. Analysis of actual arrival traffic showed that this improved trajectory prediction accuracy leads to improved inter-arrival separation prediction accuracy for longer look ahead times. The difference in mean inter-arrival separation prediction error between the Fourier transform and dead reckoning models was 0.2 nmi for a look ahead time of 120 sec, a 33 percent improvement, with a corresponding 32 percent improvement in standard deviation.

  16. Final work plan : groundwater monitoring at Centralia, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2005-08-31

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at the site of a former grain storage facility at Centralia, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Centralia being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Centralia.

  17. Exxon Valdez oil spill restoration plan. Final environmental impact statement

    SciTech Connect

    1994-09-01

    The purpose of the proposed action analyzed in this final environmental impact statement (FEIS) is to restore, insofar as possible, the injured natural resources and thereby the services they provide that were affected by the Exxon Valdex oil spill (EVOS). The purpose of this document is to analyze the effects of proposed uses of the remaining funds (approximately $620 million as of February 1994, after final reimbursements) in accomplishing the mission of the Trustee Council.

  18. Simulator evaluation of the final approach spacing tool

    NASA Technical Reports Server (NTRS)

    Davis, Thomas J.; Erzberger, Heinz; Green, Steven M.

    1990-01-01

    The design and simulator evaluation of an automation tool for assisting terminal radar approach controllers in sequencing and spacing traffic onto the final approach course is described. The automation tool, referred to as the Final Approach Spacing Tool (FAST), displays speed and heading advisories for arrivals as well as sequencing information on the controller's radar display. The main functional elements of FAST are a scheduler that schedules and sequences the traffic, a 4-D trajectory synthesizer that generates the advisories, and a graphical interface that displays the information to the controller. FAST was implemented on a high performance workstation. It can be operated as a stand-alone in the Terminal Radar Approach Control (TRACON) Facility or as an element of a system integrated with automation tools in the Air Route Traffic Control Center (ARTCC). FAST was evaluated by experienced TRACON controllers in a real-time air traffic control simulation. Simulation results show that FAST significantly reduced controller workload and demonstrated a potential for an increase in landing rate.

  19. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect

    L. O. Nelson

    2003-09-01

    This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

  20. The Community Service Fellowship Planning Project: Final Report.

    ERIC Educational Resources Information Center

    McKee, Robert L.; Gaffney, Michael J.

    This report describes the findings and recommendations of the Community Service Fellowship (CSF) Planning Project conducted by the American Association of Community and Junior Colleges under a grant from ACTION, the federal agency charged with promoting volunteer service. The proposed CSF program is a means of providing young people with…

  1. Fixture and layout planning for reconfigurable workcells. LDRD final report

    SciTech Connect

    Strip, D.; Phillips, C.

    1994-06-01

    The work in this program covered four primary areas: solid modeling, path planning, modular fixturing, and stability analysis. This report contains highlights of results from the program, references to published reports, and, in an appendix, a currently unpublished report which has been accepted for journal publication, but has yet to appear.

  2. Monthly Planning Manual for Beginning Vocational Agriculture Teachers. Final Report.

    ERIC Educational Resources Information Center

    Miller, Stephen S.; Yoder, Edgar P.

    The purpose of this publication is to aid the beginning teacher of vocational agriculture/agribusiness in planning for the first year as a member of the teaching profession. The manual is organized on a monthly schedule starting with July, since this is often the month when a new vocational agriculture teacher is hired. Each month includes seven…

  3. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    2000-12-06

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

  4. Metropolitan Planning Project, 1977-78. Final Performance Report.

    ERIC Educational Resources Information Center

    Arnoff, Steven M.

    This document provides a description of the Metropolitan Planning Project (MPP), its objectives, strategies, and an evaluation of its implementation in the Boston area. In order to encourage the voluntary elimination, reduction, and prevention of minority group isolation in elementary and secondary schools in Boston, the project focuses on two…

  5. Comprehensive Development Plan in Office Skills. Final Performance Report.

    ERIC Educational Resources Information Center

    Waubonsee Community Coll., Sugar Grove, IL.

    The Waubonsee Community College Comprehensive Development Plan in Office Skills served 208 students by assessment of basic skills and referral to appropriate programs or help with job skills and referral to employment during the 18-month grant period from December 1988 through June 30, 1990. The target population was minority women or economically…

  6. Collaborative Planning between General and Special Educators. Final Report.

    ERIC Educational Resources Information Center

    Beirne-Smith, Mary; Smith, Cynthia Ruth Blocker

    A study investigated the effectiveness of a structured, collaborative co-planning model. Participants were 28 general education and special education teachers, who participated in extant team or co-teaching arrangements in grades 4-12 general education classes. The model was designed to increase: (1) the number of instructional interventions…

  7. University of Tennessee, Knoxville Library. Preservation Planning Program. Final Report.

    ERIC Educational Resources Information Center

    Bengtson, Betty; And Others

    This report is the result of a year-long preservation planning study at the University of Tennessee-Knoxville Library, during which four task forces investigated the physical condition of the collections, environmental conditions of the libraries, state of disaster preparedness, and organizational issues relating to preservation. Task force…

  8. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  9. 78 FR 760 - Notice of Availability of the Final General Management Plan/Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... Impact Statement for the Ice Age Complex at Cross Plains, WI AGENCY: National Park Service, Interior... the Final General Management Plan/Environmental Impact Statement (GMP/ EIS) for the Ice Age Complex at... writing to the Superintendent, Ice Age National Scenic Trail, 700 Rayovac Drive, Suite 100,...

  10. Impact of changing demographic trends on transportation planning. Final report

    SciTech Connect

    Lede, N.W.

    1991-01-01

    The study was designed to provide a reliable database on the effects of regional demographic, economic, and technological trends on transportation needs and demands in Federal Region VI. Baseline projections on regional growth patterns and shifts, transit use, changing sociodemographic characteristics, transit costs and funding requirements were developed for use in planning and decision making. Data were collected on an on-going basis for use in determining changes in demographic and employment characteristics and for predicting future transit needs and demands. A framework and methodology were developed for use in designing a comprehensive model comprising a regional database aimed at assessing regional transportation requirements to the year 2005 and beyond. Selected findings on regional demographic trends and their impacts are discussed in detail. Travel implementations and challenges to public transportation planning are delineated from the perspective of occupational differentiation and requirements.

  11. Mississippi DOE EPSCoR planning grant. Final report

    SciTech Connect

    Steele, W.G.

    1996-09-01

    The Mississippi DOE EPSCoR planning grant committee identified three focus areas for a proposal submitted on January 25, 1995, to the US DOE: Human Resource Development, Environmental Synergisms from Fuel Mixtures of Tire Particles and Low Rank Coals, and Energy Efficient Heat Transfer Equipment and Materials. In the human resources are, efforts were undertaken to identify and develop linkages with educational institutions, national laboratories, and industries and to identify strategies for attracting and involving students in areas leading to technical careers. The fuel mixtures project was directed toward developing ways to combine scrap tire particles and lignite coal into a blended fuel that could be used in electric power generation. In the energy efficient heat transfer area, analytical and experimental investigations were planned to increase the efficiency of heat exchangers and insulating materials.

  12. Transmission Expansion Planning - A Multiyear Dynamic Approach Using a Discrete Evolutionary Particle Swarm Optimization Algorithm

    NASA Astrophysics Data System (ADS)

    Rocha, M. C.; Saraiva, J. T.

    2012-10-01

    The basic objective of Transmission Expansion Planning (TEP) is to schedule a number of transmission projects along an extended planning horizon minimizing the network construction and operational costs while satisfying the requirement of delivering power safely and reliably to load centres along the horizon. This principle is quite simple, but the complexity of the problem and the impact on society transforms TEP on a challenging issue. This paper describes a new approach to solve the dynamic TEP problem, based on an improved discrete integer version of the Evolutionary Particle Swarm Optimization (EPSO) meta-heuristic algorithm. The paper includes sections describing in detail the EPSO enhanced approach, the mathematical formulation of the TEP problem, including the objective function and the constraints, and a section devoted to the application of the developed approach to this problem. Finally, the use of the developed approach is illustrated using a case study based on the IEEE 24 bus 38 branch test system.

  13. Final work plan for targeted sampling at Webber, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2006-05-01

    This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

  14. A Piloted Simulation Study of Wake Turbulence on Final Approach

    NASA Technical Reports Server (NTRS)

    Stewart, Eric C.

    1998-01-01

    A piloted simulation study has been conducted in a research simulator to provide a means to estimate the effects of different levels of wake turbulence on final approach. A worst-case methodology was used to ensure conservative estimates. Fourteen airline pilots voluntarily participated in the study and flew almost 1000 approaches. The pilots rated the subjective severity of the disturbances using a special rating scale developed for this study. Several objective measures of the airplane/pilot response to the simulated wake turbulence were also made. All the data showed a large amount of variation between pilots and to a lesser extent for a given pilot. Therefore, the data were presented at 50, 70, 90 percentile levels as a function of vortex strength. The data allow estimates of the vortex strength for a given subjective or objective response and vice versa. The results of this study appear to be more conservative than the results of previous studies.

  15. BUBBLES: an Automated Decision Support System for Final Approach Controllers

    NASA Technical Reports Server (NTRS)

    Chi, Zhizang

    1990-01-01

    With the assumptions that an explicit schedule exists for landings (and takeoffs) at each runway, that each aircraft has declared an IAS for final approach and will be obligated to fly it as accurately as possible, and that there is a continuous estimate of average windspeed on approach, the objective was to provide automated cues to assist controllers in the spacing of landing aircraft. The cues have two characteristics. First, they are adaptive to estimation errors in position and speed by the radar tracking process and piloting errors in the execution of turns and commanded speed reductions. Second, the cues are responsive to the desires of the human controller. Several diagrams are used to help explain the system.

  16. Planning in Reverse: A Viable Approach to Organizational Leadership

    ERIC Educational Resources Information Center

    Ballantyne, Scott; Berret, Beth; Wells, Mary Ellen

    2011-01-01

    Planning in Reverse is an innovative concept designed to make organizations more successful by altering the perspective utilized in the strategy process. What is needed for organizations to thrive in this new environment of change and uncertainty is a short-term approach for long-term viability. In this book, tools and concepts regarding Planning…

  17. Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach

    ERIC Educational Resources Information Center

    Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.

    2004-01-01

    Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…

  18. A Strategic Planning Approach to Web Site Management.

    ERIC Educational Resources Information Center

    Clyde, Laurel A.

    2000-01-01

    Using her own Web site as an example, the author discusses issues and tasks associated with creating and maintaining a professional Web site, within the context of a strategic planning approach. The stages of the process are outlined, including identification of user needs; selection and evaluation of information; organization of information;…

  19. The Integrated Curriculum of "Planned Approach to Healthier Schools"

    ERIC Educational Resources Information Center

    Lounsbery, Monica; Gast, Julie; Smith, Nicole

    2005-01-01

    Planned Approach to Healthier Schools (PATHS) is a multicomponent school program that aims to establish and sustain a social norm consistent with physical activity and healthy nutrition in the school community. The PATHS components include: (1) a professional development and wellness program for faculty and staff; (2) ongoing social-marketing…

  20. Personal Development Plans: Insights from a Case Based Approach

    ERIC Educational Resources Information Center

    Greenan, Peter

    2016-01-01

    Purpose: In light of contemporary shifts away from annual appraisals, this study aims to explore the implications of using a personal development plan (PDP) as a means of focussing on continuous feedback and development to improve individual performance and ultimately organisational performance. Design/methodology/approach: Data were collected…

  1. 75 FR 34151 - Availability: Final Comprehensive Conservation Plan and Finding of No Significant Impact; Modoc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... managers with a 15-year plan for achieving refuge purposes and contributing toward the mission of the... press releases, updates to constituents, and a Federal Register notice (74 FR 28271, June 15, 2009). The... Fish and Wildlife Service Availability: Final Comprehensive Conservation Plan and Finding of...

  2. Final Report of the ADAMHA/NIAAA Planning Panel on Alcoholism Counselor Credentialing.

    ERIC Educational Resources Information Center

    Boynton, Susan; And Others

    This final report presents the recommendation of the National Institute on Alcohol Abuse and Alcoholism (NIAAA) Planning Panel that a National Credentialing Organization for Alcoholism Counselors be established. Implementation plans for the National Credentialing Organization are presented in three phases. Funding and staffing are discussed. A…

  3. 76 FR 77249 - Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... National Park Service Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone..., Yellowstone National Park. SUMMARY: Pursuant to Sec. 102(2)(C) of the National Environmental Policy Act of... announces the availability of the Record of Decision for the Winter Use Plan for Yellowstone National......

  4. 78 FR 38072 - General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... National Park Service General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains... Plan, Guadalupe Mountains National Park, Texas. DATES: The NPS will execute a Record of Decision no... CONTACT: Dennis A. V squez, Superintendent, Guadalupe Mountains National Park, HC 60, Box 400, Salt...

  5. A Functional Plan for an Illinois Library Telecommunications Network. The Final Report.

    ERIC Educational Resources Information Center

    Calabrese, Alice; And Others

    This final report describes the plan developed by the Northern Illinois Learning Resources Cooperative, a consortium of 44 community colleges and other academic institutions, which was awarded a Library Services and Construction Act (LSCA) Title III planning grant to research the requirements for a statewide electronic network that would provide…

  6. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... actions, within four management alternatives, designed to address new management challenges and issues... Bureau of Land Management Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land...

  7. Preservation Planning Program. Study Report. Iowa State University Library. Final Report.

    ERIC Educational Resources Information Center

    Galejs, John; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Iowa State University, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing plans and procedures for preserving…

  8. Exxon Valdez restoration plan. summary of the final environmental impact statement

    SciTech Connect

    1994-09-01

    The Exxon Valdez Trustee Council issued a draft Restoration Plan in November of 1993. The draft Restoration Plan provides long-term guidance for restoring the resources and services injured by the Exxon Valdez Oil Spill of March 24, 1989. This final Environmental Impact Statement (FEIS) analyzes the potential environmental impacts of the draft Restoration Plan as the Proposed Action - Alternative 5, and four other alternatives that provide different policies and emphasis than the proposed action.

  9. Planning School Desegregation: A Working Note. Final Report.

    ERIC Educational Resources Information Center

    Keeler, Emmett

    A methodology for busing to achieve school desegregation is described. Two different approaches are proposed: a student interracial contact score and a quota method. Travel time and number of children bused are proxies for busing costs. Useful data include travel time, school capacity, and student residences for each region and level of school. A…

  10. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ..., for which notice was provided in the Federal Register on July 26, 2006 (71 FR 42415). The Kerr... Bureau of Indian Affairs Final Environmental Impact Statement for Drought Management Planning at the Kerr... Affairs (BIA) provides this notice that the Final Environmental Impact Statement (FEIS) for...

  11. 75 FR 44977 - General Management Plan/Abbreviated Final Environmental Impact Statement, Roosevelt-Vanderbilt...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... availability of the Abbreviated Final Environmental Impact Statement for the General Management Plan (GMP/EIS) for Roosevelt-Vanderbilt National Historic Sites, Hyde Park, New York. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses,...

  12. 77 FR 31870 - Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... Fish and Wildlife Service Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and Wildlife Service (Service) announce that our Final Comprehensive Conservation...

  13. Database management for power system planning: Final report

    SciTech Connect

    Carlsen, K.; Fink, L.H.

    1988-05-01

    This project was undertaken to assess the suitability of representative commercial data base management system (DBMS) for serving as a basis for integrating power system planning analysis software. A data base design was developed for that purpose, and implementation was attempted using the chosen commercial DBMS. Implementation was carried only far enough to demonstrate limitations due to the current state of the art in DBMS practice, which are related in large part to a commercial rather than engineering orientation. The data base design for power system analysis software integration that was developed is described in full. It appears suitable for implementation, given suitable means, and alternative means are discussed. Such means include existing special purpose software for the integration of engineering software, and possibly special purpose data base machines. 7 figs., 13 tabs.

  14. Standard review plan for dry cask storage systems. Final report

    SciTech Connect

    1997-01-01

    The Standard Review Plan (SRP) For Dry Cask Storage Systems provides guidance to the Nuclear Regulatory Commission staff in the Spent Fuel Project Office for performing safety reviews of dry cask storage systems. The SRP is intended to ensure the quality and uniformity of the staff reviews, present a basis for the review scope, and clarification of the regulatory requirements. Part 72, Subpart B generally specifies the information needed in a license application for the independent storage of spent nuclear fuel and high level radioactive waste. Regulatory Guide 3.61 {open_quotes}Standard Format and Content for a Topical Safety Analysis Report for a Spent Fuel Dry Storage Cask{close_quotes} contains an outline of the specific information required by the staff. The SRP is divided into 14 sections which reflect the standard application format. Regulatory requirements, staff positions, industry codes and standards, acceptance criteria, and other information are discussed.

  15. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    SciTech Connect

    LaFreniere, L. M.

    2012-07-15

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining

  16. Wildlife Protection, Mitigation, and Enhancment Plan: Minidoka Dam: Final Report.

    SciTech Connect

    Meuleman, G. Allyn; Martin, Robert C.; Hansen, H. Jerome

    1991-04-01

    A wildlife protection, mitigation, and enhancement plan has been developed for the US Bureau of Reclamation's Minidoka Dam and Reservoir in south-central Idaho. Specific objectives of this study included the following: Develop protection, mitigation, and enhancement goals and objectives for target wildlife species; identify potential protection, mitigation, and enhancement opportunities to achieve the mitigation objectives; and coordinate project activities with agencies, tribes, and the public. The interagency work group previously assessed the impacts of Minidoka Dam on wildlife. There were estimated losses of 10,503 habitat units (HU's) for some target wildlife species and gains of 5,129 HU's for other target species. The work group agreed that mitigation efforts should be directed toward target species that were negatively impacted by Minidoka Dam. They developed the following prioritized mitigation goals: 1,531 river otter HU's in riparian/river habitat, 1,922 sage grouse HU's in shrub-steppe (sagebrush-grassland) habitat, 1,746 mule deer HU's in shrub-steppe habitat, and 175 yellow warbler HU's in deciduous scrub-shrub wetland habitat. The work group proposed the following preferred mitigation options, in priority order: Provide benefits of 1,706 river otter and yellow warbler HU's by protecting and enhancing riparian/river habitat in south central Idaho; and provide benefits of 3,668 sage grouse and mule deer HU's by protecting and enhancing shrub-steppe (sagebrush-grassland) habitat. 38 refs., 2 figs., 5 tabs.

  17. Final work plan for targeted investigation at Hilton, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2007-08-28

    This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

  18. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  19. Final work plan for targeted investigation at Inman, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2007-11-05

    In 1997, low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5 {micro}g/L) were detected in groundwater at Inman, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1997 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Inman from 1954 to 1965. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Inman is located in southwest McPherson County, approximately 10 mi southwest of the city of McPherson (Figure 1.1). To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation at Inman, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA. For this work plan, Argonne compiled historical data related to the previous investigations and grain storage operations at Inman. Through a review of documents acquired from all available sources, other potential contaminant source areas (in addition to the former CCC/USDA facility) have been identified as (1) the commercial grain storage structures northwest of Inman, along the railroad right-of-way, and (2) small former private grain storage facilities west of Main Street and near the former CCC/USDA facility at the southern edge of Inman (Figure 1.2). Previous investigations and the potential source areas are discussed in Section 2.

  20. Bonneville Power Administration Fish & Wildlife Implementation Plan Final Environmental Impact Statement

    SciTech Connect

    N /A

    2003-05-09

    The Pacific Northwest has long prided itself on its bountiful and diverse natural resources--its forests and grasslands, minerals and rivers, fish and wildlife. The Region has also relied on these natural resources to serve multiple, and sometimes conflicting, uses. The independent demands of the whole spectrum of human uses (such as irrigation, municipal water supplies, grazing, fishing and hunting, electric power production, recreation, timber harvest, and transportation) have placed increasing stress on the natural resources of the Columbia River Basin. One consequence is that, over the last decade, the number of fish and wildlife species listed as endangered or threatened under the Endangered Species Act (ESA) has dramatically increased. The Region has sought to stem and even reverse the species decline. Unfortunately, after a decade of good intentions, there has been less progress than is necessary to reverse this trend. Here are the most important reasons: (1) Different groups have different value judgments about priorities, leading to different (and often conflicting) ideas about what recovery and mitigation efforts should be. (2) There is no clear and agreed-upon scientific answer to the problem. (3) Conflicting directives and jurisdictions of regional authorities have meant that funds dedicated to fish and wildlife mitigation and recovery efforts have often been used less efficiently and effectively than they otherwise could have been. Recently, regional entities have taken steps to work together to develop a comprehensive and coordinated planning approach for species recovery and mitigation. For example, over the past several years the Council's Columbia River Basin Fish and Wildlife Program, the Recommendations for the Protection and Restoration of Fish In The Columbia River Basin by the Governors of the four Northwestern States, and the Federal Caucus' Conservation of Columbia Basin Fish: Final Basinwide Salmon Recovery Strategy (Basinwide Strategy

  1. Modelling sustainable development planning: a multicriteria decision conferencing approach.

    PubMed

    Quaddus, M A; Siddique, M A

    2001-09-01

    Development planning is multidimensional in nature. On the one hand, it addresses economic growth, and on the other, it deals with economic development of the whole nation. Sustainable development, on the other hand, emphasizes the need for integration of economics and environment, as well as promoting intra- and intergenerational equity. While the literature deals extensively with the issues of sustainable development, it lacks a prescription of an easy-to-use, yet rigorous, methodology for it. In this paper, we offer a decision conferencing approach to sustainable development planning based on a multicriteria model. The integrated model is presented and applied to a sustainable development planning exercise in a third world country. Sample results are presented and detailed sensitivity analyses show the environmental variables that are of major concern. PMID:11697680

  2. Innovative approaches to inertial confinement fusion reactors: Final report

    SciTech Connect

    Bourque, R.F.; Schultz, K.R.

    1986-11-01

    Three areas of innovative approaches to inertial confinement fusion (ICF) reactor design are given. First, issues pertaining to the Cascade reactor concept are discussed. Then, several innovative concepts are presented which attempt to directly recover the blast energy from a fusion target. Finally, the Turbostar concept for direct recovery of that energy is evaluated. The Cascade issues discussed are combustion of the carbon granules in the event of air ingress, the use of alternate granule materials, and the effect of changes in carbon flow on details of the heat exchanger. Carbon combustion turns out to be a minor problem. Four ICF innovative concepts were considered: a turbine with ablating surfaces, a liquid piston system, a wave generator, and a resonating pump. In the final analysis, none show any real promise. The Turbostar concept of direct recovery is a very interesting idea and appeared technically viable. However, it shows no efficiency gain or any decrease in capital cost compared to reactors with conventional thermal conversion systems. Attempts to improve it by placing a close-in lithium sphere around the target to increase gas generation increased efficiency only slightly. It is concluded that these direct conversion techniques require thermalization of the x-ray and debris energy, and are Carnot limited. They therefore offer no advantage over existing and proposed methods of thermal energy conversion or direct electrical conversion.

  3. A Planning Approach of Engineering Characteristics Based on QFD-TRIZ Integrated

    NASA Astrophysics Data System (ADS)

    Liu, Shang; Shi, Dongyan; Zhang, Ying

    Traditional QFD planning method compromises contradictions between engineering characteristics to achieve higher customer satisfaction. However, this compromise trade-off can not eliminate the contradictions existing among the engineering characteristics which limited the overall customer satisfaction. QFD (Quality function deployment) integrated with TRIZ (the Russian acronym of the Theory of Inventive Problem Solving) becomes hot research recently for TRIZ can be used to solve contradictions between engineering characteristics which construct the roof of HOQ (House of quality). But, the traditional QFD planning approach is not suitable for QFD integrated with TRIZ for that TRIZ requires emphasizing the contradictions between engineering characteristics at problem definition stage instead of compromising trade-off. So, a new planning approach based on QFD / TRIZ integration is proposed in this paper, which based on the consideration of the correlation matrix of engineering characteristics and customer satisfaction on the basis of cost. The proposed approach suggests that TRIZ should be applied to solve contradictions at the first step, and the correlation matrix of engineering characteristics should be amended at the second step, and at next step IFR (ideal final result) must be validated, then planning execute. An example is used to illustrate the proposed approach. The application indicated that higher customer satisfaction can be met and the contradictions between the characteristic parameters are eliminated.

  4. An efficient neural network approach to dynamic robot motion planning.

    PubMed

    Yang, S X; Meng, M

    2000-03-01

    In this paper, a biologically inspired neural network approach to real-time collision-free motion planning of mobile robots or robot manipulators in a nonstationary environment is proposed. Each neuron in the topologically organized neural network has only local connections, whose neural dynamics is characterized by a shunting equation. Thus the computational complexity linearly depends on the neural network size. The real-time robot motion is planned through the dynamic activity landscape of the neural network without any prior knowledge of the dynamic environment, without explicitly searching over the free workspace or the collision paths, and without any learning procedures. Therefore it is computationally efficient. The global stability of the neural network is guaranteed by qualitative analysis and the Lyapunov stability theory. The effectiveness and efficiency of the proposed approach are demonstrated through simulation studies. PMID:10935758

  5. Quality planning, part 1: a holistic and practical approach.

    PubMed

    Odegard, Russell D

    2013-01-01

    This article is the first in a two-part series that breaks down quality planning into a systematic, stepwise process. Part 1 addresses the tangible aspects of compounding that directly influence the quality of compounded preparations. Part 2 will speak to less tangible but critically important mechanisms targeting continuous improvement. The author takes a holistic approach, which he describes as a comprehensive, systematic, and proactive approach to continuously improve everything that may, directly or indirectly, influence the quality of a preparation or service. PMID:24459786

  6. Single Event Effects (SEE) Testing: Practical Approach to Test Plans

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Pellish, Jonathan A.; Berg, Melanie D.

    2014-01-01

    While standards and guidelines for performing SEE testing have existed for several decades, guidance for developing SEE test plans has not been as easy to find. In this presentation, the variety of areas that need to be considered ranging from resource issues (funds, personnel, schedule) to extremely technical challenges (particle interaction and circuit application), shall be discussed. Note: We consider the approach outlined here as a living document: mission specific constraints and new technology related issues always need to be taken into account.

  7. Final monitoring plan for site restoration at Murdock, Nebraska.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2006-02-28

    In early 2005, Argonne National Laboratory conducted an Engineering Evaluation/Cost Analysis (EE/CA; Argonne 2005b) to address carbon tetrachloride contamination identified in groundwater and surface water at Murdock, Nebraska, approximately 22 mi east-northeast of Lincoln (Figure 1.1). The EE/CA study was performed for the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA), as the technical basis for a proposed removal action for the Murdock site. The EE/CA was conducted in compliance with an Administrative Order on Consent issued for Murdock by the U.S. Environmental Protection Agency (EPA 1991). Three removal action alternatives were examined through the use of site-specific data and predictive simulations of groundwater flow and contaminant transport performed with calibrated numerical models. The alternatives were evaluated individually and compared against performance criteria established under the National Oil and Hazardous Substances Pollution Contingency Plan and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). On the basis of these evaluations, an alternative employing phytoremediation in conjunction with seasonal groundwater extraction and treatment by spray irrigation was recommended by the CCC/USDA to permanently reduce the carbon tetrachloride contaminant levels in groundwater and surface water at the site. The proposed alternative is being implemented in cooperation with the EPA. Under the direction of the CCC/USDA and the EPA, implementation of the chosen removal action occurred in phases, beginning in April 2005. Installation of all the required remediation systems was completed by the end of August 2005. Specific technical objectives of the removal action are as follows: (1) To eliminate pathways for potential human exposure to carbon tetrachloride concentrations above the regulatory limit of 44.2 {micro}g/L in surface water at the site. (2) To minimize or eliminate any detrimental

  8. Leadership development plan. A CQI approach to management performance appraisals.

    PubMed

    Fisk, S V; Maas, L M

    1995-05-01

    In 1993 managers at St. Mary's Hospital Medical Center established the attributes necessary to be a successful leader in St. Mary's continuous quality improvement culture. These leadership attributes formed the basis of a new performance appraisal system for managers. The medical center adopted its new performance appraisal system at the beginning of fiscal year 1994-1995. The objective of the plan is to develop St. Mary's managers' leadership skills. St. Mary's Leadership Development Plan is an ongoing cycle, with three phases. First, managers and administrative representatives jointly agree on objectives to discuss throughout the fiscal year. The objectives reflect the hospital planning and financial goals and objectives, department goals and objectives, and leadership growth opportunities. Each manager is then responsible for gathering feedback from subordinates on how well he or she is meeting the set objectives. Finally, each manager and administrative representative highlight accomplishments achieved during the fiscal year. St. Mary's decided to discontinue pay-for-performance salary increases beginning with the 1994-1995 fiscal year, coinciding with the initiation of the Leadership Development Plan. Manager's compensation is now a flat percentage increase granted to all managers. PMID:10142227

  9. Applying electrical utility least-cost approach to transportation planning

    SciTech Connect

    McCoy, G.A.; Growdon, K.; Lagerberg, B.

    1994-09-01

    Members of the energy and environmental communities believe that parallels exist between electrical utility least-cost planning and transportation planning. In particular, the Washington State Energy Strategy Committee believes that an integrated and comprehensive transportation planning process should be developed to fairly evaluate the costs of both demand-side and supply-side transportation options, establish competition between different travel modes, and select the mix of options designed to meet system goals at the lowest cost to society. Comparisons between travel modes are also required under the Intermodal Surface Transportation Efficiency Act (ISTEA). ISTEA calls for the development of procedures to compare demand management against infrastructure investment solutions and requires the consideration of efficiency, socioeconomic and environmental factors in the evaluation process. Several of the techniques and approaches used in energy least-cost planning and utility peak demand management can be incorporated into a least-cost transportation planning methodology. The concepts of avoided plants, expressing avoidable costs in levelized nominal dollars to compare projects with different on-line dates and service lives, the supply curve, and the resource stack can be directly adapted from the energy sector.

  10. A mathematical approach for mission planning and rehearsal

    NASA Astrophysics Data System (ADS)

    Gelenbe, Erol; Wang, Yu

    2006-05-01

    The world that we live in is filled with large scale agent systems, from diverse fields such as biology, ecology or finance. Inspired by the desire to better understand and make the best out of these systems, we propose an approach which builds stochastic mathematical models, in particular G-networks models, that allow the efficient representation of systems of agents and offer the possibility to analyze their behavior using mathematics. This work complements our previous results on the discrete event simulation of adversarial tactical scenarios. We aim to provide insights into systems in terms of their performance and behavior, to identify the parameters which strongly influence them, and to evaluate how well individual goals can be achieved. With our approach, one can compare the effects of alternatives and chose the best one available. We model routine activities as well as situations such as: changing plans (e.g. destination or target), splitting forces to carry out alternative plans, or even changing on adversary group. Behaviors such as competition and collaboration are included. We demonstrate our approach with some urban military planning scenarios and analyze the results. This work can be used to model the system at different abstraction levels, in terms of the number of agents and the size of the geographical location. In doing so, we greatly reduce computational complexity and save time and resources. We conclude the paper with potential extensions of the model, for example the arrival of reinforcements, the impact of released chemicals and so on.

  11. The development of the Final Approach Spacing Tool (FAST): A cooperative controller-engineer design approach

    NASA Technical Reports Server (NTRS)

    Lee, Katharine K.; Davis, Thomas J.

    1995-01-01

    Historically, the development of advanced automation for air traffic control in the United States has excluded the input of the air traffic controller until the need of the development process. In contrast, the development of the Final Approach Spacing Tool (FAST), for the terminal area controller, has incorporated the end-user in early, iterative testing. This paper describes a cooperative between the controller and the developer to create a tool which incorporates the complexity of the air traffic controller's job. This approach to software development has enhanced the usability of FAST and has helped smooth the introduction of FAST into the operational environment.

  12. A Preliminary Evaluation of Richmond Plan Programs (Pre-Technical Plan) in Secondary Schools. Final Report.

    ERIC Educational Resources Information Center

    Kincaid, Harry V.; Hamilton, Phyllis D.

    Descriptive data were collected in the form of program case histories, student and teacher surveys and interviews, and school records from eight schools (1966-67) and two schools (1967-68) that were conducting Richmond Plan type programs for average underachieving secondary students. In writing this evaluation, two major questions were asked,…

  13. 77 FR 54922 - Record of Decision for the General Management Plan/Final Environmental Impact Statement, Hampton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ... National Park Service Record of Decision for the General Management Plan/Final Environmental Impact... Final General Management Plan and Environmental Impact Statement (GMP/EIS), Hampton National Historic... Region signed the Record of Decision selecting Alternative 3 as the approved General Management Plan...

  14. 78 FR 76176 - Notice of Availability of the Record of Decision for the Final Trail Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ... implement the 1985 Trail Plan. Actions common to all action alternatives included the restoration of the... National Park Service Notice of Availability of the Record of Decision for the Final Trail Management Plan... the Record of Decision (ROD) for the Final Trail Management Plan/ Environmental Impact Statement...

  15. A Unified Approach to Model-Based Planning and Execution

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Dorais, Gregory A.; Fry, Chuck; Levinson, Richard; Plaunt, Christian; Norvig, Peter (Technical Monitor)

    2000-01-01

    Writing autonomous software is complex, requiring the coordination of functionally and technologically diverse software modules. System and mission engineers must rely on specialists familiar with the different software modules to translate requirements into application software. Also, each module often encodes the same requirement in different forms. The results are high costs and reduced reliability due to the difficulty of tracking discrepancies in these encodings. In this paper we describe a unified approach to planning and execution that we believe provides a unified representational and computational framework for an autonomous agent. We identify the four main components whose interplay provides the basis for the agent's autonomous behavior: the domain model, the plan database, the plan running module, and the planner modules. This representational and problem solving approach can be applied at all levels of the architecture of a complex agent, such as Remote Agent. In the rest of the paper we briefly describe the Remote Agent architecture. The new agent architecture proposed here aims at achieving the full Remote Agent functionality. We then give the fundamental ideas behind the new agent architecture and point out some implication of the structure of the architecture, mainly in the area of reactivity and interaction between reactive and deliberative decision making. We conclude with related work and current status.

  16. An exact approach to direct aperture optimization in IMRT treatment planning

    NASA Astrophysics Data System (ADS)

    Men, Chunhua; Romeijn, H. Edwin; Caner Taşkın, Z.; Dempsey, James F.

    2007-12-01

    We consider the problem of intensity-modulated radiation therapy (IMRT) treatment planning using direct aperture optimization. While this problem has been relatively well studied in recent years, most approaches employ a heuristic approach to the generation of apertures. In contrast, we use an exact approach that explicitly formulates the fluence map optimization (FMO) problem as a convex optimization problem in terms of all multileaf collimator (MLC) deliverable apertures and their associated intensities. However, the number of deliverable apertures, and therefore the number of decision variables and constraints in the new problem formulation, is typically enormous. To overcome this, we use an iterative approach that employs a subproblem whose optimal solution either provides a suitable aperture to add to a given pool of allowable apertures or concludes that the current solution is optimal. We are able to handle standard consecutiveness, interdigitation and connectedness constraints that may be imposed by the particular MLC system used, as well as jaws-only delivery. Our approach has the additional advantage that it can explicitly account for transmission of dose through the part of an aperture that is blocked by the MLC system, yielding a more precise assessment of the treatment plan than what is possible using a traditional beamlet-based FMO problem. Finally, we develop and test two stopping rules that can be used to identify treatment plans of high clinical quality that are deliverable very efficiently. Tests on clinical head-and-neck cancer cases showed the efficacy of our approach, yielding treatment plans comparable in quality to plans obtained by the traditional method with a reduction of more than 75% in the number of apertures and a reduction of more than 50% in beam-on time, with only a modest increase in computational effort. The results also show that delivery efficiency is very insensitive to the addition of traditional MLC constraints; however, jaws

  17. Social marketing: an approach to planned social change.

    PubMed

    Kotler, P; Zaltman, G

    1971-07-01

    This article examines the applicability of marketing concepts to social causes and social change. Social marketing is defined as the design, implementation, and control of programs calculated to influence the acceptability of social ideas and involving considerations of product planning, pricing, communication, distribution and marketing research. Wiebe examined four social advertising campaigns and concluded that their effectiveness depended on the presence of adequate force, direction, adequate and compatible social mechanism, and distance (the "cost" of the new attitude as seen by message's message"s recepient). A marketing planning approach is not a guarantee for the achievement of social objectives; yet, it represents a bridging mechanism linking the knowledge of the behavioral scientist with the socially useful implementation of that knowledge. PMID:12276120

  18. The metal-free approach to restorative treatment planning.

    PubMed

    Cortellini, Davide; Valenti, Marco; Canale, Angelo

    2006-01-01

    Considerable developments in the area of metal-free restorations--in response to increasing esthetic demands from patients--are offering the clinician and dental technician new therapeutic paths to follow when performing restorative treatments. Effective and reliable high-strength ceramic systems, suitable for anterior and posterior sites, may allow the achievement of predictable esthetics and function. Along with the evident indications for the treatment of anterior compromised elements, these types of restorations may be used in a wider variety of clinical cases, including complex prosthetic rehabilitations. Appropriate usage of different materials according to the specific clinical situation is mandatory for long-lasting, functional, and esthetic results. Therefore, a thorough application of metal-free restorations may be considered a "metal-free approach", which includes a specific formulation of treatment planning. In this article, the different materials, selection criteria, clinical indications, and benefits are evaluated, with a particular regard for treatment planning. PMID:19655489

  19. An alternative approach to solar system exploration planning

    NASA Astrophysics Data System (ADS)

    Herman, Daniel H.; Niehoff, John C.; Spadoni, Daniel J.

    Planning for the future exploration of the solar system has involved the structuring of a series of missions that address major scientific objectives at a minimum runout cost for the entire endeavor. In many cases, however, the optimal structuring of a program that would minimize the runout cost would entail an unacceptable high annual funding. Our actual planning must consider the planning wedge imposed on the National Aeronautics and Space Administration. It is vital that a plan be structured that copes with the annual restraint. If we do not recognize this, our plan will not be realized and a queing problem will result, thus negating all of our planning efforts. This paper presents ideas as to how planetary initiatives can be structured, wherein the peak annual funding is minimized. One vital aspect in the plan is to have a transportation capability that can launch a mission in any planetary opportunity. Solar electric propulsion can provide this capability. Another cost reduction approach would be to structure a mission set in a time sequenced fashion that could utilize essentially the same spacecraft for the implementation of several missions. This opportunity does exist. A third technique would be to fulfill a scientific objective in several sequential missions rather than attempt to accomplish all of the objectives with one mission. This approach might be applied to a mission currently in the planning stage designated the Saturn Orbiter Dual Probe mission. The current concept involves the delivery of a Saturn probe, a Titan probe, and a Saturn Orbiter by a one Shuttle launch. In this case, the orbiter must serve as a relay station for both probes; map the magnetosphere of Saturn; conduct a survey of Saturn's major satellites; and perform the planetological observation of Saturn itself. This mission entails the development of a complex spacecraft that would be required to have a fairly long life due to the extended mission operations at the benefit of

  20. Incentives for nondiscriminatory wellness programs in group health plans. Final rule.

    PubMed

    2013-06-01

    This document contains final regulations, consistent with the Affordable Care Act, regarding nondiscriminatory wellness programs in group health coverage. Specifically, these final regulations increase the maximum permissible reward under a health-contingent wellness program offered in connection with a group health plan (and any related health insurance coverage) from 20 percent to 30 percent of the cost of coverage. The final regulations further increase the maximum permissible reward to 50 percent for wellness programs designed to prevent or reduce tobacco use. These regulations also include other clarifications regarding the reasonable design of health-contingent wellness programs and the reasonable alternatives they must offer in order to avoid prohibited discrimination. PMID:23734399

  1. 78 FR 51205 - Culebra National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ... invasive species control and eradication and pursue habitat restoration on offshore cays. Within 5 years of... Fish and Wildlife Service Culebra National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No Significant Impact for the Environmental Assessment AGENCY: Fish and...

  2. Supplement to the Final Report on the Edgewood School Plan. Volume II.

    ERIC Educational Resources Information Center

    Development Associates, Inc., Arlington, VA.

    Prepared to assist professional educators and researchers who want greater detail on certain aspects of the evaluation of the five-year Experimental Schools Program conducted by the Edgewood Independent School District in San Antonio, Texas, this supplement to the Final Report on the Edgewood School Plan is composed of abstracts that give the…

  3. The Collaborative Planning Outreach Project: Building Comprehensive Early Childhood Systems. Final Report.

    ERIC Educational Resources Information Center

    Smith, Barbara J.

    This final report describes the objectives, activities and outcomes of a federally funded initiative to train and assist early childhood interagency teams in a model of planning systems and services for all young children, including children with disabilities and other special needs. The project is based on the value of stakeholder ownership in…

  4. 78 FR 8184 - DEEPWATER HORIZON Oil Spill; Final Phase II Early Restoration Plan and Environmental Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... DEEPWATER HORIZON Oil Spill; Final Phase II Early Restoration Plan and Environmental Review AGENCY: Interior... Addressing Injuries Resulting from the DEEPWATER HORIZON Oil Spill (Framework Agreement), notice is hereby... services injured or lost as a result of the DEEPWATER HORIZON oil spill, which occurred on or about...

  5. 77 FR 23741 - DEEPWATER HORIZON Oil Spill; Final Phase I Early Restoration Plan and Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... Fish and Wildlife Service DEEPWATER HORIZON Oil Spill; Final Phase I Early Restoration Plan and... DEEPWATER HORIZON Oil Spill (Framework Agreement), notice is hereby given that ] the Federal and State... the DEEPWATER HORIZON oil spill, which occurred on or about April 20, 2010, in the Gulf of Mexico....

  6. Essential Communication and Documentation Skills. Module: Final Assessment and Action Planning.

    ERIC Educational Resources Information Center

    Medina, Muriel; And Others

    This module is the 10th of 10 in the Essential Communication and Documentation Skills curriculum. It develops final assessment and action planning, workplace literacy skills identified as being directly related to the job of the direct care worker. The curriculum is designed to improve the competence of New York State Division for Youth direct…

  7. 76 FR 50247 - Willapa National Wildlife Refuge, Pacific County, WA; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Fish and Wildlife Service Willapa National Wildlife Refuge, Pacific County, WA; Final Comprehensive Conservation Plan and Environmental Impact Statement AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce...

  8. 76 FR 43156 - Approval and Promulgation of Air Quality Implementation Plan; Missouri; Final Disapproval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... Disapproval of Interstate Transport State Implementation Plan Revision for the 2006 24-Hour PM2.5 NAAQS AGENCY.... Final Action III. Administrative Requirements I. Background On March 18, 2011 (76 FR 14835), EPA... proposed Transport Rule (see 75 FR 45210, August 2, 2010). The reader should refer to the March 18,...

  9. Diffusion Planning for the Right to Read Packaged Programs: A Supplement to the Final Report.

    ERIC Educational Resources Information Center

    Campeau, Peggie L.; Roberts, Sarah J.

    This supplement to the final report, "Identifying, Validating, and Multi-Media Packaging of Effective Reading Programs," was prepared for Right to Read for use in developing an effective plan for interesting potential users in examining and possibly adopting the validated, packaged programs. The six chapters in the document address key steps in…

  10. 78 FR 24228 - Lake Andes National Wildlife Refuge Complex, Lake Andes, SD; Final Comprehensive Conservation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... review and comment following the announcement in the Federal Register on October 29, 2012 ] (77 FR 65574... Fish and Wildlife Service Lake Andes National Wildlife Refuge Complex, Lake Andes, SD; Final... conservation plan and finding of no significant impact (FONSI) for the Lake Andes National Wildlife...

  11. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  12. Minimum-jerk online planning by a mathematical programming approach

    NASA Astrophysics Data System (ADS)

    Canali, Federico; Guarino Lo Bianco, Corrado; Locatelli, Marco

    2014-06-01

    Engineering applications are often handled by means of algorithms for constrained optimization. Currently, more frequently than in the past, the need for fast solvers that admit convergence times compatible with those of online applications is strongly felt. Such a need poses new additional implementation requirements, since the convergence of the mathematical programming algorithms is no longer sufficient to allow their use, but, conversely, such convergence must be achieved in very limited times. This article proposes an efficient approach for a constrained minimum-jerk online planning problem. In particular, the robotic application considered requires accounting for time, distance, velocity and acceleration constraints. The proposed approach returns good quality solutions by admitting execution times that meet the online requirements. Comparisons with a previously adopted strategy are proposed.

  13. Innovative design approaches for large wind turbine blades : final report.

    SciTech Connect

    Not Available

    2004-05-01

    The goal of the Blade System Design Study (BSDS) was investigation and evaluation of design and manufacturing issues for wind turbine blades in the one to ten megawatt size range. A series of analysis tasks were completed in support of the design effort. We began with a parametric scaling study to assess blade structure using current technology. This was followed by an economic study of the cost to manufacture, transport and install large blades. Subsequently we identified several innovative design approaches that showed potential for overcoming fundamental physical and manufacturing constraints. The final stage of the project was used to develop several preliminary 50m blade designs. The key design impacts identified in this study are: (1) blade cross-sections, (2) alternative materials, (3) IEC design class, and (4) root attachment. The results show that thick blade cross-sections can provide a large reduction in blade weight, while maintaining high aerodynamic performance. Increasing blade thickness for inboard sections is a key method for improving structural efficiency and reducing blade weight. Carbon/glass hybrid blades were found to provide good improvements in blade weight, stiffness, and deflection when used in the main structural elements of the blade. The addition of carbon resulted in modest cost increases and provided significant benefits, particularly with respect to deflection. The change in design loads between IEC classes is quite significant. Optimized blades should be designed for each IEC design class. A significant portion of blade weight is related to the root buildup and metal hardware for typical root attachment designs. The results show that increasing the number of blade fasteners has a positive effect on total weight, because it reduces the required root laminate thickness.

  14. Selected approaches to determining the purpose of emergency planning zones

    NASA Astrophysics Data System (ADS)

    Dobeš, Pavel; Baudišová, Barbora; Sluka, Vilém; Skřínský, Jan; Danihelka, Pavel; Dlabka, Jakub; Řeháček, Jakub

    2013-04-01

    One of the major accident hazards (hereinafter referred to as "MAH") tools to determine the range of effects of a major accident and consequent protection of the public is the determination of the emergency planning zone (hereinafter referred to as "zone"). In the Czech Republic, the determination of the zone is regulated by the Decree No. 103/2006 Coll. laying down the principles for determination of the emergency planning zone and the extent and manner of elaborating the external emergency plan (hereinafter referred to as "Decree") 3. The Decree is based on the principles of the IAEA-TECDOC-727 method - Manual for the Classification and Prioritization of Risks Due to Major Accidents in Process and Related Industries (hereinafter referred to as "method" and "manual", respectively)3. In the manual, it is pointed out that the method used is not suitable for making emergency plans for special situations (industrial activities in an inhabited area). Nonetheless, its principles and procedures are still used for such purposes in the Czech Republic. The expert scientific community dealing with MAH issues in the Czech Republic, however, realizes that the procedure of the zone boundary delineation should be modified to reflect up-to-date knowledge in protection of the public and its enhancement. Therefore, the OPTIZON Project (Optimization of the Emergency Planning Zone Designation and Elaboration of Emergency Plans Based on Threatening Effects of Dangerous Chemical Substances at Operational Accidents with Respect to Inhabitant Protection Enhancement) was developed and approved for the Program of Security Research of the Czech Republic 2010 - 2015 (BV II/2-VS). One of the main project's objectives is to define clearly the purpose of the zone because at present it is not quite apparent. From the general view, this step may seem insignificant or trivial, but the reverse is true. It represents one of the most important stages in seeking the approach to the zone designation as

  15. Final Rules for Grandfathered Plans, Preexisting Condition Exclusions, Lifetime and Annual Limits, Rescissions, Dependent Coverage, Appeals, and Patient Protections Under the Affordable Care Act. Final rules.

    PubMed

    2015-11-18

    This document contains final regulations regarding grandfathered health plans, preexisting condition exclusions, lifetime and annual dollar limits on benefits, rescissions, coverage of dependent children to age 26, internal claims and appeal and external review processes, and patient protections under the Affordable Care Act. It finalizes changes to the proposed and interim final rules based on comments and incorporates subregulatory guidance issued since publication of the proposed and interim final rules. PMID:26595941

  16. Final consolidated action plan to Tiger Team. Volume 1, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  17. Final consolidated action plan to Tiger Team. Volume 2, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  18. Final Action Plan to Tiger Team. Environmental, safety and health assessment

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  19. Backwards planning approach for rapid attitude maneuvers steering

    NASA Astrophysics Data System (ADS)

    Verbin, D.

    Remote sensing satellites are often built with payloads that do not include line of sight steering mechanisms. In cases, when frequent line of sight retargeting is required, there is a need for efficient actuators and control schemes that would support rapid attitude manoeuvring together with adequate pointing accuracy and stability between the manoeuvres. Within this frame, this research develops the Backwards Planning approach as one of the possible control methods for rapid manoeuvring. The method is based on state feedback and combines time efficient together with straight forward computation flow. Novel efficient methods to execute the Backwards Planning Control in the 3D attitude space are proposed here. The methods refer both for the first saturated control phase of the manoeuvre and for the last braking phase. The actuators used for the spacecraft control in this research are either Reaction Wheels (RWs) or Single Gimbal Control Moments Gyros (SGCMGs) or both of them together. The advantage of the SGCMG is in rapid rotational manoeuvring, but their application for high quality pointing requires very accurate gimbal mechanisms. On the other hand, RWs are usually more suitable for accurate pointing, but their torque to power performance is inferior in manoeuvring. It is shown that the coordination of SGCMGs and RWs together enables to draw more performance from the SGCMGs in terms of agility and meet the pointing requirements between manoeuvres where only the RWs are used. Novel SGCMG steering laws are suggested as well. While the steering laws determine the required angular rate for each gimbal, most steering laws are defined in the angular momentum domain and output the gimbals angular rates to produce a given required torque or angular momentum increment. This research however, practices a novel steering law in the gimbal angles domain. While both steering laws turn to be dynamically equivalent for small control signals, as in the steady state, it is shown

  20. The School District Role in Introducing Microcomputers: A Contingency Planning Approach.

    ERIC Educational Resources Information Center

    Williams, Richard C.; And Others

    1984-01-01

    Briefly discusses no-plan approach and linear approach to school district computer involvement and suggests contingency planning approach is better. Components of this approach--conducting situation audit of internal and external environments, generating within-district support, formulating district-wide policies, and developing an ongoing…

  1. Sustainability science: an integrated approach for health-programme planning.

    PubMed

    Gruen, Russell L; Elliott, Julian H; Nolan, Monica L; Lawton, Paul D; Parkhill, Anne; McLaren, Cameron J; Lavis, John N

    2008-11-01

    Planning for programme sustainability is a key contributor to health and development, especially in low-income and middle-income countries. A consensus evidence-based operational framework would facilitate policy and research advances in understanding, measuring, and improving programme sustainability. We did a systematic review of both conceptual frameworks and empirical studies about health-programme sustainability. On the basis of the review, we propose that sustainable health programmes are regarded as complex systems that encompass programmes, health problems targeted by programmes, and programmes' drivers or key stakeholders, all of which interact dynamically within any given context. We show the usefulness of this approach with case studies drawn from the authors' experience. PMID:18984192

  2. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect

    D. Vandel

    2003-09-01

    This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

  3. Helping Traditional Teachers To Plan and Implement Student Centered Classrooms; Selected Classroom Project. Final Report.

    ERIC Educational Resources Information Center

    Johnson, Gerald F. J.; Page, William C.

    The Selected Classroom Project was planned, implemented, evaluated, and disseminated between October 1970 and June 1971. It narrowed the focus of Project COD to helping teachers in specific classroom develop a practical approach to the transition from traditional to "open" classrooms. The 21 participating teachers in grades 4 through 8 were…

  4. Evaluation of hospital inpatient complications: a planning approach

    PubMed Central

    2010-01-01

    Background Hospital inpatient complications are one of a number of adverse health care outcomes. Reducing complications has been identified as an approach to improving care and saving resources as part of the health care reform efforts in the United States. An objective of this study was to describe the Potentially Preventable Complications software developed as a tool for evaluating hospital inpatient outcomes. Additional objectives included demonstration of the use of this software to evaluate the connection between health care outcomes and expenses in United States administrative data at the state and local levels and the use of the software to plan and implement interventions to reduce hospital complications in one U.S. metropolitan area. Methods The study described the Potentially Preventable Complications software as a tool for evaluating these inpatient hospital outcomes. Through administrative hospital charge data from California and Maryland and through cost data from three hospitals in Syracuse, New York, expenses for patients with and without complications were compared. These comparisons were based on patients in the same All Patients Refined Diagnosis Related Groups and severity of illness categories. This analysis included tests of statistical significance. In addition, the study included a planning process for use of the Potentially Preventable Complications software in three Syracuse hospitals to plan and implement reductions in hospital inpatient complications. The use of the PPC software in cost comparisons and reduction of complications included tests of statistical significance. Results The study demonstrated that Potentially Preventable Complications were associated with significantly increased cost in administrative data from the United States in California and Maryland and in actual cost data from the hospitals of Syracuse, New York. The implementation of interventions in the Syracuse hospitals was associated with the reduction of

  5. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... FR 34538). Paragraph (a)(1)(ii) of the interim final regulations provides that if a group health plan... Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan Under... and Insurance Oversight, Department of Health and Human Services. ACTION: Amendment to interim...

  6. 77 FR 24451 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ...EPA is proposing to approve, through direct final rulemaking, Illinois' revised State Plan to control air pollutants from Hazardous/ Medical/Infectious Waste Incinerators (HMIWI). The Illinois Environmental Protection Agency submitted the revised State Plan on November 8, 2011 and supplemented it on December 28, 2011, following the required public process. The revised State Plan is consistent......

  7. 77 FR 24451 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ...EPA is proposing to approve, through direct final rulemaking, Indiana's revised State Plan to control air pollutants from Hazardous/ Medical/Infectious Waste Incinerators (HMIWI). The Indiana Department of Environmental Management submitted the revised State Plan on December 19, 2011, following the required public process. The revised State Plan is consistent with Emission Guidelines......

  8. Developing and Testing Simulated Occupational Experiences for Distributive Education Students in Rural Communities: Volume III: Training Plans: Final Report.

    ERIC Educational Resources Information Center

    Virginia Polytechnic Inst. and State Univ., Blacksburg.

    Volume 3 of a three volume final report presents prototype job training plans developed as part of a research project which pilot tested a distributive education program for rural schools utilizing a retail store simulation plan. The plans are for 15 entry-level and 15 career-level jobs in seven categories of distributive business (department…

  9. Final proposed plan, Army Materials Technology Laboratory, task order 1, remedial investigation/feasibility study

    SciTech Connect

    1996-04-01

    The U.S. Army is proposing a cleanup plan, referred to as a preferred alternative, to address outdoor contamination at the MTL Superfund site in Watertown, Massachusetts. The Proposed Plan recommends one of the cleanup options from among those that were evaluated during the Remedial Investigation (RI) and Feasibility Study (FS) performed for the site. The Army is publishing this Proposed Plan to provide opportunity for public review and comment on the cleanup alternatives, known as remedial alternatives, under consideration for the site. The Army is soliciting comments on the proposed level of cleanup and will consider public comments as part of the final decision-making process for selecting the cleanup remedy for the site.

  10. Aquatic ecosystem condition: The Fraser River Action Plan approach

    SciTech Connect

    Tuominen, T.; Raymond, B.; Sekela, M.; Reynoldson, T.

    1995-12-31

    A major goal of the Canadian government`s Fraser River Action Plan (FRAP) is to clean up existing pollution problems in the Fraser River Basin. In support of this goal, the Environmental Quality Assessment Program is assessing the quality of the aquatic environment, particularly with respect to contaminants. The program, conducted from 1993 to 1998, is to establish a baseline condition for the aquatic ecosystem against which the success of clean up efforts can be measured. The FRAP approach is to use a combination of contaminant exposure or stressor indicators and organism ``effects`` indicators. The focus is on three components of the aquatic ecosystem: (1) bed sediment, (2) resident fish and (3) benthos. A priority for the program is integration of the three components, wherever possible. Bed sediments, as indicators of contaminant stress, are sampled at fourteen reaches in the river and major tributaries. Two species of resident fish are sampled and analyzed for condition factors, enzyme induction, histopathology and contaminant content at each of nine sites in the basin. The resident fish data are providing a measure of contaminant exposure and effect. Organism community effects will be assessed by a study which is classifying approximately 200 tributary and mainstem sites based on benthos community structure. For the first time in a large river system in Canada, this benthos study uses a multivariate approach which relates a suite of chemical and physical characteristics to benthos community structure.

  11. A strategic approach for Water Safety Plans implementation in Portugal.

    PubMed

    Vieira, Jose M P

    2011-03-01

    Effective risk assessment and risk management approaches in public drinking water systems can benefit from a systematic process for hazards identification and effective management control based on the Water Safety Plan (WSP) concept. Good results from WSP development and implementation in a small number of Portuguese water utilities have shown that a more ambitious nationwide strategic approach to disseminate this methodology is needed. However, the establishment of strategic frameworks for systematic and organic scaling-up of WSP implementation at a national level requires major constraints to be overcome: lack of legislation and policies and the need for appropriate monitoring tools. This study presents a framework to inform future policy making by understanding the key constraints and needs related to institutional, organizational and research issues for WSP development and implementation in Portugal. This methodological contribution for WSP implementation can be replicated at a global scale. National health authorities and the Regulator may promote changes in legislation and policies. Independent global monitoring and benchmarking are adequate tools for measuring the progress over time and for comparing the performance of water utilities. Water utilities self-assessment must include performance improvement, operational monitoring and verification. Research and education and resources dissemination ensure knowledge acquisition and transfer. PMID:21301119

  12. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  13. Dispersive approaches for three-particle final state interaction

    DOE PAGESBeta

    Guo, Peng; Danilkin, Igor V.; Szczepaniak, Adam P.

    2015-10-30

    In this work, we presented different representations of Khuri-Treiman equation, the advantage and disadvantage of each representations are discussed. With a scattering amplitude toy model, we also studied the sensitivity of solution of KT equation to left-hand cut of toy model and to the different approximate methods. At last, we give a brief discussion of Watson's theorem when three particles in final states are involved.

  14. 2013 Nutrition Risk Research Plan Review Final Report. Research Plan Review for: The Risk Factor of Inadequate Nutrition

    NASA Technical Reports Server (NTRS)

    2014-01-01

    The 2013 Nutrition Risk Standing Review Panel (from here on referred to as the SRP) was impressed by the degree of progress the nutrition discipline has made with the research plan presented since the 2012 Nutrition Risk SRP WebEx/teleconference. The scientists and staff associated with the nutrition discipline have, in addition, continued their impressive publication track record. Specifically the SRP found that the novel and important progress in the ocular health research area (Gap N7.3) represents an important advance in understanding the etiology and potential countermeasures for this condition and thinks that the work will not only be valuable for vision, but may have implications for cardiovascular health, as well. The SRP also considered the bone countermeasure data presented a potentially valuable tool for investigating bone metabolism under the unique conditions of space travel, specifically the innovation of variable use of stable Ca isotopes for bone synthesis and equal contribution for bone to investigate bone metabolism, as well as, the impact of the advanced resistive exercise device (ARED) on body composition during spaceflight. Finally, the SRP considers the planned Integrated Nutrition task to be an important and necessary strategic part of the research plan. The SRP is concerned that the risks observed in previous research on Low Earth Orbit (LEO) may not capture all the risks of longer duration flight beyond LEO. In particular, the SRP believes that there may be a much greater likelihood of an intensified chronic inflammatory response compared to the very minimal evidence seen to date and that modest effects seen in LEO, such as the reduction in appetite, may not predict an absence in longer duration flight out of LEO. The added complications of longer duration flight, greater bio-behavioral stress, radiation exposure, poorer communication, and inability to respond to unforeseen exigencies may create different risks. Thus, preparation for

  15. Comparison of anatomy-based, fluence-based and aperture-based treatment planning approaches for VMAT.

    PubMed

    Rao, Min; Cao, Daliang; Chen, Fan; Ye, Jinsong; Mehta, Vivek; Wong, Tony; Shepard, David

    2010-11-01

    Volumetric modulated arc therapy (VMAT) has the potential to reduce treatment times while producing comparable or improved dose distributions relative to fixed-field intensity-modulated radiation therapy. In order to take full advantage of the VMAT delivery technique, one must select a robust inverse planning tool. The purpose of this study was to evaluate the effectiveness and efficiency of VMAT planning techniques of three categories: anatomy-based, fluence-based and aperture-based inverse planning. We have compared these techniques in terms of the plan quality, planning efficiency and delivery efficiency. Fourteen patients were selected for this study including six head-and-neck (HN) cases, and two cases each of prostate, pancreas, lung and partial brain. For each case, three VMAT plans were created. The first VMAT plan was generated based on the anatomical geometry. In the Elekta ERGO++ treatment planning system (TPS), segments were generated based on the beam's eye view (BEV) of the target and the organs at risk. The segment shapes were then exported to Pinnacle TPS followed by segment weight optimization and final dose calculation. The second VMAT plan was generated by converting optimized fluence maps (calculated by the Pinnacle TPS) into deliverable arcs using an in-house arc sequencer. The third VMAT plan was generated using the Pinnacle SmartArc IMRT module which is an aperture-based optimization method. All VMAT plans were delivered using an Elekta Synergy linear accelerator and the plan comparisons were made in terms of plan quality and delivery efficiency. The results show that for cases of little or modest complexity such as prostate, pancreas, lung and brain, the anatomy-based approach provides similar target coverage and critical structure sparing, but less conformal dose distributions as compared to the other two approaches. For more complex HN cases, the anatomy-based approach is not able to provide clinically acceptable VMAT plans while highly

  16. Comparison of anatomy-based, fluence-based and aperture-based treatment planning approaches for VMAT

    NASA Astrophysics Data System (ADS)

    Rao, Min; Cao, Daliang; Chen, Fan; Ye, Jinsong; Mehta, Vivek; Wong, Tony; Shepard, David

    2010-11-01

    Volumetric modulated arc therapy (VMAT) has the potential to reduce treatment times while producing comparable or improved dose distributions relative to fixed-field intensity-modulated radiation therapy. In order to take full advantage of the VMAT delivery technique, one must select a robust inverse planning tool. The purpose of this study was to evaluate the effectiveness and efficiency of VMAT planning techniques of three categories: anatomy-based, fluence-based and aperture-based inverse planning. We have compared these techniques in terms of the plan quality, planning efficiency and delivery efficiency. Fourteen patients were selected for this study including six head-and-neck (HN) cases, and two cases each of prostate, pancreas, lung and partial brain. For each case, three VMAT plans were created. The first VMAT plan was generated based on the anatomical geometry. In the Elekta ERGO++ treatment planning system (TPS), segments were generated based on the beam's eye view (BEV) of the target and the organs at risk. The segment shapes were then exported to Pinnacle3 TPS followed by segment weight optimization and final dose calculation. The second VMAT plan was generated by converting optimized fluence maps (calculated by the Pinnacle3 TPS) into deliverable arcs using an in-house arc sequencer. The third VMAT plan was generated using the Pinnacle3 SmartArc IMRT module which is an aperture-based optimization method. All VMAT plans were delivered using an Elekta Synergy linear accelerator and the plan comparisons were made in terms of plan quality and delivery efficiency. The results show that for cases of little or modest complexity such as prostate, pancreas, lung and brain, the anatomy-based approach provides similar target coverage and critical structure sparing, but less conformal dose distributions as compared to the other two approaches. For more complex HN cases, the anatomy-based approach is not able to provide clinically acceptable VMAT plans while highly

  17. Manpower Planning: The Need for a Diagnostic Approach.

    ERIC Educational Resources Information Center

    Fyfe, John

    1980-01-01

    Makes observations about progress in the field of manpower planning in highly industrialized and developed countries. Discusses the internal and external labor market, the state of the art of manpower planning at the micro level, and an economic framework. (CT)

  18. Social impact assessment: A review and proposed approach: Final report

    SciTech Connect

    Bradbury, J A

    1986-12-01

    The objective of the report is to identify the essential components of a comprehensive plan to assess the potential social impacts of the proposed construction and operation of a high level radioactive waste repository by the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The tasks taken to achieve this objective are: examination of the literature on Social Impact Assessment (SIA); identification of different conceptual frameworks that have been proposed or used in SIA; examination of specific aspects of the frameworks; assessment of strengths and weaknesses of the frameworks; synthesis of common elements in these frameworks; and examination and evaluation of methods of data collection and analysis. 150 refs., 6 figs., 7 tabs.

  19. Study of the Subarea Approach to Health Manpower Planning.

    ERIC Educational Resources Information Center

    Comprehensive Health Planning, Inc., Chicago, IL.

    Recognizing the need for a health manpower planning system that would insure the recruitment, training, utilization, and retention of area residents as skilled providers of health care, Comprehensive Health Planning, Inc., Metropolitan Chicago (CHP), and the West Side Health Planning Organization (WSHPO) embarked on a 1-year project to demonstrate…

  20. A Home Learning Center Approach to Early Stimulation. Final Report.

    ERIC Educational Resources Information Center

    Gordon, Ira J.; Guinagh, Barry J.

    The Home Learning Center (HLC) Project, a combination of research and demonstration containing phases of basic research, material development and field testing of materials and delivery system, began in 1968 as a longitudinal investigation of a home-oriented approach to intervention in the lives of very young children which might enhance their…

  1. Report on Approaches to Database Translation. Final Report.

    ERIC Educational Resources Information Center

    Gallagher, Leonard; Salazar, Sandra

    This report describes approaches to database translation (i.e., transferring data and data definitions from a source, either a database management system (DBMS) or a batch file, to a target DBMS), and recommends a method for representing the data structures of newly-proposed network and relational data models in a form suitable for database…

  2. The educational approach within Colombia's nutrition plan (PAN)

    NASA Astrophysics Data System (ADS)

    de Pizano, Julia Mejia

    1980-03-01

    With the knowledge that malnutrition affects the quality of life of an individual, the Colombian Government set up in 1976 a unique multi-sectorial plan (PAN), to combat the country's serious malnutrition. Government agencies and private industries in the sectors of production, distribution, health, sanitation, and education have coordinated their previously independent efforts. Among the interesting aspects are the coordination of sectors through work at various levels and through control of the budget, the limitation of bureaucracy, and the decentralization of decision-making. The ongoing attempts to overcome the difficulties encountered include making decisions in the face of inconclusive knowledge on what constitutes a well-balanced diet; combating the lack of knowledge of professionals about the environment of the poorest percentage of the population; and revising the traditional teaching method to make it more successful through a multi-media approach to assure wider coverage and more impact for the least cost, using materials such as games, puppets, posters and radio.

  3. Combined approach to the inverse protein folding problem. Final report

    SciTech Connect

    Ruben A. Abagyan

    2000-06-01

    The main scientific contribution of the project ''Combined approach to the inverse protein folding problem'' submitted in 1996 and funded by the Department of Energy in 1997 is the formulation and development of the idea of the multilink recognition method for identification of functional and structural homologues of newly discovered genes. This idea became very popular after they first announced it and used it in prediction of the threading targets for the CASP2 competition (Critical Assessment of Structure Prediction).

  4. Phase 1 Final status survey plan for the West Valley demonstration project.

    SciTech Connect

    Johnson, R. L.

    2011-05-31

    This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to

  5. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    SciTech Connect

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  6. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... Planning) and Director's Order Number 12 (Conservation Planning, Environmental Impact Analysis, and... development of the Preserve. Alternative B: The concept for management under alternative B would be to...

  7. Population planning: a well co-ordinated approach required.

    PubMed

    1984-01-01

    of the region explicit or implicit incentives and/or disincentives are included in the population/family planning program. In the Philippine Population Program, incentives are explicitly given only to volunteer program workers. Disincentives are incorporated in the Internal Revenue Code and the Woman and Child Labor Code. In Indonesia preference is given to incentives rather than to disincentives. The government of Bangladesh is seriously considering the introduction of a package deal of incentives and disincentives in an all out effort to reach desired demographic objectives. In Nepal such a package is already in operation. The more recent innovative measures to encourage the 2-child child family norm in India include: increased compensation money to acceptors of sterilization and IUD and giving lottery tickets to acceptors of sterilization. There is recognition in these countries of the need for an integrated approach to population and development programs. PMID:12313052

  8. New approaches for high-efficiency solar cells. Final report

    SciTech Connect

    Bedair, S M; El-Masry, N A

    1997-12-01

    This report summarizes the activities carried out in this subcontract. These activities cover, first the atomic layer epitaxy (ALE) growth of GaAs, AlGaAs and InGaP at fairly low growth temperatures. This was followed by using ALE to achieve high levels of doping both n-type and p-type required for tunnel junctions (Tj) in the cascade solar cell structures. Then the authors studied the properties of AlGaAs/InGaP and AlGaAs/GaAs tunnel junctions and their performances at different growth conditions. This is followed by the use of these tunnel junctions in stacked solar cell structures. The effect of these tunnel junctions on the performance of stacked solar cells was studied at different temperatures and different solar fluences. Finally, the authors studied the effect of different types of black surface fields (BSF), both p/n and n/p GaInP solar cell structures, and their potential for window layer applications. Parts of these activities were carried in close cooperation with Dr. Mike Timmons of the Research Triangle Institute.

  9. A novel approach to modeling unstable EOR displacements. Final report

    SciTech Connect

    Peters, E.J.

    1994-04-01

    Most enhanced oil recovery schemes involve the displacement of a more dense and more viscous oil by a less dense and less viscous fluid in a heterogeneous porous medium. The interaction of heterogeneity with the several competing forces, namely, viscous, capillary, gravitational, and dispersive forces, can conspire to make the displacements unstable and difficult to model and to predict. The objective of this research was to develop a systematic methodology for modeling unstable fluid displacements in heterogeneous media. Flow visualization experiments were conducted using X-ray computed tomography imaging and a video imaging workstation to gain insights into the dynamics of unstable displacements, acquire detailed quantitative experimental image data for calibrating numerical models of unstable displacements, and image and characterize heterogeneities in laboratory cores geostatistically. High-resolution numerical models modified for use on vector-architecture supercomputers were used to replicate the image data. Geostatistical models of reservoir heterogeneity were incorporated in order to study the interaction of hydrodynamic instability and heterogeneity in reservoir displacements. Finally, a systematic methodology for matching the experimental data with the numerical models and scaling the laboratory results to other systems were developed. The result is a new method for predicting the performance of unstable EOR displacements in the field based on small-scale displacements in the laboratory. The methodology is general and can be applied to forecast the performance of most processes that involve fluid flow and transport in porous media. Therefore, this research should be of interest to those involved in forecasting the performance of enhanced oil recovery processes and the spreading of contaminants in heterogeneous aquifers.

  10. Approach to rapid mission design and planning. [earth orbit missions

    NASA Technical Reports Server (NTRS)

    Green, W. G.; Matthys, V. J.

    1973-01-01

    Methods and techniques are described for implementation in automated computer systems to assess parametric data, capabilities, requirements and constraints for planning earth orbit missions. Mission planning and design procedures are defined using two types of typical missions as examples. These missions were the high energy Astronomical Observatory Satellite missions, and Small Applications Technology Satellite missions.

  11. A Social-Action Approach for Planning Education.

    ERIC Educational Resources Information Center

    Bolan, Richard S.; And Others

    The growing complexity of urban industrial society necessitates adequate planning techniques to insure future livability, but traditional methods of training planners have emphasized technology and ignored the human element. To remedy this deficiency, training programs should be expanded to include the social and political aspects of planning.…

  12. College and University Strategic Planning: A Methodological Approach.

    ERIC Educational Resources Information Center

    Hollowood, James R.

    A two-year strategic planning methodology is presented by which college administrators can develop a framework for institutional decision-making. After introductory material describing the theoretical characteristics of the methodology, the report outlines and discusses eight basic planning components: (1) developing a context for strategic…

  13. Planning Strategically for Communication--A Holistic Approach.

    ERIC Educational Resources Information Center

    Frank, Allan D.

    The primary cause of difficulties in the implementation phase of planned change in business organizations is the lack of a parallel communication plan to facilitate the changes implied by new strategy. Planners usually concentrate on content (the strategy itself) to the neglect of process (how the strategy should be developed and implemented).…

  14. Language Planning and Questions of National Security: An Overview of Planning Approaches

    ERIC Educational Resources Information Center

    Liddicoat, Anthony J.

    2008-01-01

    This paper examines ways in which language planning has been used to address issues of security. It gives an overview of a range of areas of security in which government-level language planning has had a role as a way of developing a typology of language planning work in this area. It examines the nexus between language, communication and security…

  15. Emergency response planning guidelines: A step-by-step approach

    SciTech Connect

    Petroff, D.M.

    1997-02-01

    Emergency planning and response has become a larger part of hazardous materials management since the enactment of the Emergency Planning and Community Right to Know Act, Hazardous Waste Operations and Emergency Response, Process Safety Management, and now Risk Management for Accidental Chemical Releases under the Clean Air Act (CAA). A large obstacle to the emergency planning process has been how to evaluate an incident and determine its potential consequences. To help alleviate this problem, the American Industrial Hygiene Association developed and approved a series of emergency response planning guidelines (ERPGs). The guidelines are intended to provide estimates of concentrations where the adverse effects as described for each of the levels defined would be observed -- thus providing a common measurement of harm to people from a multitude of chemicals. To date, ERPGs have been adopted by the US EPA, the Occupational Safety and Health Administration, the Department of Transportation, and the Department of Energy for emergency planning or response.

  16. A molecular-genetic approach to studying source-sink interactions in Arabidopsis thalian. Final report

    SciTech Connect

    Gibson, S. I.

    2000-06-01

    This is a final report describing the results of the research funded by the DOE Energy Biosciences Program grant entitled ''A Molecular-Genetic Approach to Studying Source-Sink Interactions in Arabidiopsis thaliana''.

  17. Final Report on the Fuel Saving Effectiveness of Various Driver Feedback Approaches

    SciTech Connect

    Gonder, J.; Earleywine, M.; Sparks, W.

    2011-03-01

    This final report quantifies the fuel-savings opportunities from specific driving behavior changes, identifies factors that influence drivers' receptiveness to adopting fuel-saving behaviors, and assesses various driver feedback approaches.

  18. Creating Our Future: An Integrated and Future Oriented Approach to Planning.

    ERIC Educational Resources Information Center

    Shields, Carolyn M.

    1990-01-01

    The planning and decision-making models from the traditional research paradigms, combined with the tools and orientation of futurists, have much to contribute to our knowledge about planning for educational change. Educators must approach planning, coping with change, goal setting, decision making, problem solving, and curricular leadership with…

  19. Breaking the Boundaries: A One-World Approach to Planning Education. Urban Innovation Abroad Series.

    ERIC Educational Resources Information Center

    Sanyal, Bishwapriya, Ed.

    Chapters in this collection present the views of academics and professionals from the Third World who have received their planning education in the west and who now hold posts in western urban and regional planning schools. They discuss the need for a radically changed curriculum based on a comparative, one-world approach to planning education.…

  20. A Preservation Program for the Colorado State University Libraries. The Final Report of the ARL/OMS Preservation Planning Program.

    ERIC Educational Resources Information Center

    Green, Stephen; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…

  1. 75 FR 34537 - Interim Final Rules for Group Health Plans and Health Insurance Coverage Relating to Status as a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... Health Insurance Coverage Relating to Status as a Grandfathered Health Plan Under the Patient Protection...-AB68 Interim Final Rules for Group Health Plans and Health Insurance Coverage Relating to Status as a... Consumer Information and Insurance Oversight, Department of Health and Human Services. ACTION:...

  2. 78 FR 24232 - Record of Decision for the Denali Park Road Final Vehicle Management Plan and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... plan/environmental impact statement was published in the Federal Register on August 1, 2011 (FR 45848... final plan/environmental impact statement was published in the Federal Register on July 29, 2012 (FR..., the environmentally preferable alternative, measures adopted to minimize environmental harm,...

  3. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    SciTech Connect

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  4. Robust Planning for Autonomous Navigation of Mobile Robots in Unstructured, Dynamic Environments: An LDRD Final Report

    SciTech Connect

    EISLER, G. RICHARD

    2002-08-01

    This report summarizes the analytical and experimental efforts for the Laboratory Directed Research and Development (LDRD) project entitled ''Robust Planning for Autonomous Navigation of Mobile Robots In Unstructured, Dynamic Environments (AutoNav)''. The project goal was to develop an algorithmic-driven, multi-spectral approach to point-to-point navigation characterized by: segmented on-board trajectory planning, self-contained operation without human support for mission duration, and the development of appropriate sensors and algorithms to navigate unattended. The project was partially successful in achieving gains in sensing, path planning, navigation, and guidance. One of three experimental platforms, the Minimalist Autonomous Testbed, used a repetitive sense-and-re-plan combination to demonstrate the majority of elements necessary for autonomous navigation. However, a critical goal for overall success in arbitrary terrain, that of developing a sensor that is able to distinguish true obstacles that need to be avoided as a function of vehicle scale, still needs substantial research to bring to fruition.

  5. Regional power systems planning: a state of the art assessment. Final report

    SciTech Connect

    Not Available

    1980-10-01

    The purpose of this report was to define regional power systems planning problems, the tools available and their shortcomings, and to document all of the above in a concise readable form. The approach consisted of a survey and literature search. The survey determined the tools being used by utilities, the tools they had rejected, and the tools they planned to try out. The literature search was conducted for the purpose of documenting the tools available, and performing a comparative analysis of these tools. The project included a mix of utility, university, and consulting organizations. Several organizations were consulted in the selection of the participants. A non-profit organization, The University of Oklahoma, was selected to manage the project. The results were reviewed in a series of four one day meetings by known authorities in each field. This report consists of the results of this project. Perhaps its major finding is that several aspects of the regional planning problem are not well defined, the roles of the various participants in regional planning is not clear, and certainly research is needed for the development of new methodology.

  6. 45 CFR 2103.1 - General approaches to review of plans by the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false General approaches to review of plans by the Commission. 2103.1 Section 2103.1 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION OF FINE ARTS STATEMENTS OF POLICY § 2103.1 General approaches to review of plans by the Commission. The Commission functions relate to...

  7. Curriculum Planning and the Concept of Participation in the Reggio Emilia Pedagogical Approach

    ERIC Educational Resources Information Center

    Hocevar, Andreja; Šebart, Mojca Kovac; Štefanc, Damijan

    2013-01-01

    The article analyses two defining assumptions about the Reggio Emilia (RE) approach: the absence of a planned curriculum designed in advance as a basis for educational work and children's participation in preschools. The authors demonstrate that different approaches to planning preschool education have advantages and disadvantages, which we…

  8. Assessing Changes in Job Behavior Due to Training: A Guide to the Participant Action Plan Approach.

    ERIC Educational Resources Information Center

    Office of Personnel Management, Washington, DC.

    This guide provides a brief introduction to the Participant Action Plan Approach (PAPA) and a user's handbook. Part I outlines five steps of PAPA which determine how job behavior is changed by training course or program participation. Part II, the manual, is arranged by the five steps of the PAPA approach. Planning for PAPA discusses making…

  9. 45 CFR 2103.1 - General approaches to review of plans by the Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false General approaches to review of plans by the Commission. 2103.1 Section 2103.1 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION OF FINE ARTS STATEMENTS OF POLICY § 2103.1 General approaches to review of plans by the...

  10. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... COMMISSION Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan, Section 13.6.1, Revision 1 on Physical Security--Combined License and Operating Reactors AGENCY: Nuclear Regulatory Commission (NRC). ACTION: Notice of Availability. SUMMARY: The NRC is issuing its Final Revision...

  11. 77 FR 76515 - Notice of Availability of the National Petroleum Reserve-Alaska Final Integrated Activity Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Bureau of Land Management Notice of Availability of the National Petroleum Reserve-Alaska Final... National Petroleum Reserve in Alaska (NPR-A) Final Integrated Activity Plan/Environmental Impact...

  12. 76 FR 76972 - Release of Final Integrated Review Plan for the National Ambient Air Quality Standards for Lead

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... available for public comment (76 FR 20347). The final IRP announced today has been prepared after... was issued on February 26, 2010 (75 FR 8934). Dated: December 5, 2011. Mary E. Henigin, Acting... AGENCY Release of Final Integrated Review Plan for the National Ambient Air Quality Standards for...

  13. 77 FR 24980 - Final General Management Plan and Environmental Impact Statement for the South Unit of Badlands...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... the Final General Management Plan and Environmental Impact Statement (GMP/EIS) for the South Unit of Badlands National Park, South Dakota. DATES: The Final GMP/EIS will remain available for public review for... Environmental Protection Agency. ADDRESSES: Copies of the GMP/EIS are available by request by writing...

  14. Language Management Theory as One Approach in Language Policy and Planning

    ERIC Educational Resources Information Center

    Nekvapil, Jirí

    2016-01-01

    Language Policy and Planning is currently a significantly diversified research area and thus it is not easy to find common denominators that help to define basic approaches within it. Richard B. Baldauf attempted to do so by differentiating between four basic approaches: (1) the classical approach, (2) the language management approach (Language…

  15. MRI-based treatment plan simulation and adaptation for ion radiotherapy using a classification-based approach

    PubMed Central

    2013-01-01

    Background In order to benefit from the highly conformal irradiation of tumors in ion radiotherapy, sophisticated treatment planning and simulation are required. The purpose of this study was to investigate the potential of MRI for ion radiotherapy treatment plan simulation and adaptation using a classification-based approach. Methods Firstly, a voxelwise tissue classification was applied to derive pseudo CT numbers from MR images using up to 8 contrasts. Appropriate MR sequences and parameters were evaluated in cross-validation studies of three phantoms. Secondly, ion radiotherapy treatment plans were optimized using both MRI-based pseudo CT and reference CT and recalculated on reference CT. Finally, a target shift was simulated and a treatment plan adapted to the shift was optimized on a pseudo CT and compared to reference CT optimizations without plan adaptation. Results The derivation of pseudo CT values led to mean absolute errors in the range of 81 - 95 HU. Most significant deviations appeared at borders between air and different tissue classes and originated from partial volume effects. Simulations of ion radiotherapy treatment plans using pseudo CT for optimization revealed only small underdosages in distal regions of a target volume with deviations of the mean dose of PTV between 1.4 - 3.1% compared to reference CT optimizations. A plan adapted to the target volume shift and optimized on the pseudo CT exhibited a comparable target dose coverage as a non-adapted plan optimized on a reference CT. Conclusions We were able to show that a MRI-based derivation of pseudo CT values using a purely statistical classification approach is feasible although no physical relationship exists. Large errors appeared at compact bone classes and came from an imperfect distinction of bones and other tissue types in MRI. In simulations of treatment plans, it was demonstrated that these deviations are comparable to uncertainties of a target volume shift of 2 mm in two directions

  16. A Systemwide Approach to Improving Early Childhood Program Quality in the Detroit Metropolitan Area. Final Report.

    ERIC Educational Resources Information Center

    Shouse, A. Clay; Epstein, Ann S.

    This document is the final report of the McGregor-funded High/Scope training initiative, a system-wide approach to improving the quality of early childhood programs in the Detroit metropolitan area. The 3-year project was based on the validated High/Scope educational approach and training model, which advocates hands-on active learning for both…

  17. Environmental planning, ecosystem science, and ecosystem approaches for integrating environment and development

    NASA Astrophysics Data System (ADS)

    Slocombe, D. Scott

    1993-05-01

    Currently popular concepts such as sustainable development and sustainability seek the integration of environment and development planning. However, there is little evidence that this integration is occurring in either mainstream development planning or environmental planning. This is a function of the history, philosophies, and evolved roles of both. A brief review of the experience and results of mainstream planning, environmental planning, and ecosystem science suggests there is much in past scientific and professional practice that is relevant to the goal of integrated planning for environment and development, but still such commonly recommended reforms as systems and multidisciplinary approaches, institutional integration, and participatory, goal-oriented processes are rarely achieved. “Ecosystem approaches,” as developed and applied in ecology, human ecology, environmental planning, anthropology, psychology, and other disciplines, may provide a more transdisciplinary route to successful integration of environment and development. Experience with ecosystem approaches is reviewed, their advantages and disadvantages are discussed, and they are compared to traditional urban and regional planning, environmental planning, and ecosystem science approaches. Ultimately a synthesis of desirable characteristics for a framework to integrate environment and development planning is presented as a guide for future work and a criterion for evaluating existing programs.

  18. Towards healthy family planning attitude: a self persuasion approach.

    PubMed

    Balogun, S K

    1990-07-01

    The potential usefulness of improvisational techniques in changing deeply embedded pronatalist attitudes was assessed in an exercise involving University of Ibadan students. The students were instructed to write an essay in support of family planning. To assist them, 4 statements were provided to the students as guidelines: 1) birth control is the best way to create a happy family; 2) family planning can reduce the burden created by overly large family size; 3) family planning has the potential to raise the standard of living of African families; and 4) overpopulation is at a critical point in Nigeria. It was hypothesized that these arguments, which are counter to those prevalent in Nigeria, would force students to critically examine their thinking and lead to some attitudinal conversion. In addition, some students were given a pretest before and/or after writing the essay that asked their opinion on 5 items: 1) family planning is alien to African culture; 2) excessive childbearing is unhealthy for families and the society; 3) the government should enact antinatalist legislation; 4) there is no present need for large families; and 5) family planning is essential to provide children with a good education. Although students who wrote the essays developed stronger support for all items except number 3, the change in attitudes was not statistically significant. The attitude changes were greatest among the subset of students who took the test before writing the essay and thus were sensitized to the issues. Males, Christians, and older students were more likely to be supportive of family planning than their counterparts. Although this technique was not very effective in this study, its evaluation in other populations is suggested. PMID:12343207

  19. A stochastic optimization approach for integrated urban water resource planning.

    PubMed

    Huang, Y; Chen, J; Zeng, S; Sun, F; Dong, X

    2013-01-01

    Urban water is facing the challenges of both scarcity and water quality deterioration. Consideration of nonconventional water resources has increasingly become essential over the last decade in urban water resource planning. In addition, rapid urbanization and economic development has led to an increasing uncertain water demand and fragile water infrastructures. Planning of urban water resources is thus in need of not only an integrated consideration of both conventional and nonconventional urban water resources including reclaimed wastewater and harvested rainwater, but also the ability to design under gross future uncertainties for better reliability. This paper developed an integrated nonlinear stochastic optimization model for urban water resource evaluation and planning in order to optimize urban water flows. It accounted for not only water quantity but also water quality from different sources and for different uses with different costs. The model successfully applied to a case study in Beijing, which is facing a significant water shortage. The results reveal how various urban water resources could be cost-effectively allocated by different planning alternatives and how their reliabilities would change. PMID:23552255

  20. Developing a Classroom Management Plan Using a Tiered Approach

    ERIC Educational Resources Information Center

    Sayeski, Kristin L.; Brown, Monica R.

    2011-01-01

    In this article, the authors present a response-to-intervention (RTI) framework that both special and general education teachers can use in evaluating existing class structures and developing comprehensive classroom management plans for the purpose of managing challenging behaviors. They applied the concept of a three-tiered model of support at…

  1. An Approach to Planned Change in A College Setting.

    ERIC Educational Resources Information Center

    Crookston, Burns B.; Blaesser, Willard W.

    The elements of planned change outlined in this article, while directed toward a student personnel program, may also prove useful if applied to other aspects of the college program. One useful scheme for thinking about change describes it as a level or phase of behavior within an institutional setting, not as a static "habit" or "custom," but as a…

  2. [Learning plans: experience with an innovative approach to nursing education].

    PubMed

    Davi, F; Stillo, P; De Feo, C; Divo, A; Esposito, G; Follador, E; Moschella, S; Terentieva, I; Venaruzzo, S

    1998-01-01

    According to the literature, self-learning plans represent an helpful and very flexible method in order to individualize the nursing students' learning activities, to develop the students' autonomy and responsibility together with the skills required for continuing nursing education. The educational experience of the implementation of the self learning plans in the practical training of the nursing students of the Pediatric Nursing School of Trieste, during 1996-97, is described. The 9 third year students produced 27 learning plans. According to the mentors and the students, the overall experience had a positive impact. The presentation and evaluation of the learning plans spurred the students' initiative, the adoption of innovative learning and research strategies and allowed to replace the traditional classroom teaching lectures. The main problems related to the implementation of this method lay in the increase of mentors' workload and in the difficulties in matching the high flexibility of the method with the inflexibility and constraints of both the organization and teaching programs and paces. PMID:9807516

  3. Strategic by Design: Iterative Approaches to Educational Planning

    ERIC Educational Resources Information Center

    Chance, Shannon

    2010-01-01

    Linear planning and decision-making models assume a level of predictability that is uncommon today. Such models inadequately address the complex variables found in higher education. When academic organizations adopt paired-down business strategies, they restrict their own vision. They fail to harness emerging opportunities or learn from their own…

  4. A Holistic Approach to Family Planning Counseling and Education.

    ERIC Educational Resources Information Center

    Chaves, Lushanhya Coutinho; And Others

    A family planning clinic which was part of a large public maternity hospital in Salvador Bahia, Brazil received a grant to expand its services and to evaluate a service model focusing on client counseling and education. The counseling, education, and service provision process included individual pre-consultation with a nurse, group education and…

  5. A Strategic Planning Approach to Technology Integration: Critical Success Factors.

    ERIC Educational Resources Information Center

    Shaw, Sam; Zabudsky, Jeff

    Within most institutions of higher learning, the typical approach to the integration of new information and communications technologies into the teaching and learning process has involved a heavy reliance on early adopters. This path of least resistance approach has provided organizations with the opportunity to quickly claim a presence in the…

  6. Do Rural and Suburban Principals Approach Planning Differently? A Two-State Comparison.

    ERIC Educational Resources Information Center

    Howley, Craig B.; Howley, Aimee; Larson, William

    1999-01-01

    A survey of 604 principals of suburban and rural schools in Ohio and West Virginia found that suburban Ohio principals showed less interest in traditional-consensual approaches to planning, whereas rural Ohio principals showed less interest in the new technicist approaches. Suburban West Virginia principals favored the new technicist approach,…

  7. Planning and Evaluating Telecommunications Demonstration Projects and Assessing the Costs of Telecommunications Demonstration Projects. Final Report #146-03.

    ERIC Educational Resources Information Center

    Clippinger, John H.; Fain, Sanford B.

    This two-report volume was prepared to describe approaches for evaluating individual Office of Telecommunications Policy (OTP) demonstration projects in the future and to aid demonstration project directors in project planning and development. The first report focuses on the role of planning and evaluation activities, stressing their importance in…

  8. Minimum Value of Eligible Employer-Sponsored Plans and Other Rules Regarding the Health Insurance Premium Tax Credit. Final regulations.

    PubMed

    2015-12-18

    This document contains final regulations on the health insurance premium tax credit enacted by the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010, as amended by the Medicare and Medicaid Extenders Act of 2010, the Comprehensive 1099 Taxpayer Protection and Repayment of Exchange Subsidy Overpayments Act of 2011, and the Department of Defense and Full-Year Continuing Appropriations Act, 2011. These final regulations affect individuals who enroll in qualified health plans through Affordable Insurance Exchanges (Exchanges, sometimes called Marketplaces) and claim the health insurance premium tax credit, and Exchanges that make qualified health plans available to individuals and employers. PMID:26685369

  9. Planning phase for the New Mexico Improved Oil Recovery Project. Final report

    SciTech Connect

    Martin, F.D.; Weiss, W.W.

    1991-06-01

    This project is a collaborative effort with Los Alamos National Laboratory, Sandia National Laboratories, and a number of universities throughout the country. Field and laboratory tests were proposed to investigate advanced technologies in reservoir characterization, reservoir simulation, and recovery enhancement. Basically, the approach was to acquire an oilfield property for experimental purposes where interdisciplinary testing could be performed. Several researchers, especially in the academic area, would like to have access to field data and have expressed interest in participating in the project. A standardized dataset from a well-characterized site could be made available to anyone who is developing and validating new simulators. The data-gathering phase should be coordinated fully with the principal users of the data, and all data should be stored in an easily accessible form. A database for the New Mexico Improved Oil Recovery Project (NMIORP) could be established which would be designed for access by various computer networks. Initially, this project provided for a planning phase for the NMIORP. A field site, the Sulimar Queen Unit, has been acquired by New Mexico Tech, and the activities specified in the planning phase have been completed. A data acquisition well was drilled, logged, and cored. Geological and reservoir studies for the Sulimar Queen Unit were conducted. Results of these studies indicate that the Sulimar Queen Unit is a suitable field site for the NMIORP. This report describes the results of the studies that were conducted and outlines possible future tests that could be performed at the field site.

  10. Recovery Planning for Endangered Salmon : A Multiple Attribute Analysis, Final Report,

    SciTech Connect

    Paulsen, Charles M.; Hyman, Jeffrey B.; Wernstedt, Kris

    1993-12-09

    This analysis addresses multiple dimensions or attributes of recovery planning for endangered Snake River chinook stocks. The authors present a range of biological, economic, and social attributes for a number of recovery actions, and discuss aspects of the recovery actions that relate to each attribute. The emphasis on multiple attributes rather than on narrower biological measures alone reflects their belief that biological issues are only one of several sets of concerns that warrant attention in developing a recovery plan. Furthermore, the authors focus on both qualitative and quantitative factors because a lack of numerical information on certain attributes and recovery actions does not justify ignoring the non-numerical attributes or actions. After introducing the approach and providing the background, they define the attributes. An overview is provided of the biological modeling embedded in the analysis. The model used, the Stochastic Life Cycle Model (SLCM), determines the survival changes (relative to a base case) necessary to meet several biological criteria. These criteria reflect both the likelihood of population extinction and the projected population abundance 100 years into the future, relative to the initial abundance. The recovery options are outlined. The passage and harvest actions are characterized across the attributes is provided. The report assesses the life-stage survival improvements deemed necessary to avoid extinction and comments on the likelihood of meeting these improvements with the proposed actions. A cost-effectiveness analysis of the recovery strategies is provided.

  11. Do Rural and Suburban Principals Approach Planning Differently? A Two-State Comparison.

    ERIC Educational Resources Information Center

    Howley, Craig; Howley, Aimee; Larson, Bill

    A survey of rural and suburban principals in Ohio and West Virginia explored the different approaches to planning that principals take and examined two possible contextual influences: rural versus suburban locale, and state. A survey instrument based on five types of planning discussed in the literature was completed by 207 West Virginia…

  12. Developing a Collegial Approach to Integrated Planning at a Small College: Communication, Understanding, and Cooperation.

    ERIC Educational Resources Information Center

    Farmer, D. W.

    1983-01-01

    An effective collegial and relatively noncompetitive approach to integrated planning developed at King's College is discussed. The development of a structured system of intensive oral communication; an organizational design integrating planning, budgeting, marketing, and evaluation, and a modified matrix management system are described. (MLW)

  13. A Multifaceted Approach to Investigating Pre-Task Planning Effects on Paired Oral Test Performance

    ERIC Educational Resources Information Center

    Nitta, Ryo; Nakatsuhara, Fumiyo

    2014-01-01

    Despite the growing popularity of paired format speaking assessments, the effects of pre-task planning time on performance in these formats are not yet well understood. For example, some studies have revealed the benefits of planning but others have not. Using a multifaceted approach including analysis of the process of speaking performance, the…

  14. Putting people on the map through an approach that integrates social data in conservation planning.

    PubMed

    Stephanson, Sheri L; Mascia, Michael B

    2014-10-01

    Conservation planning is integral to strategic and effective operations of conservation organizations. Drawing upon biological sciences, conservation planning has historically made limited use of social data. We offer an approach for integrating data on social well-being into conservation planning that captures and places into context the spatial patterns and trends in human needs and capacities. This hierarchical approach provides a nested framework for characterizing and mapping data on social well-being in 5 domains: economic well-being, health, political empowerment, education, and culture. These 5 domains each have multiple attributes; each attribute may be characterized by one or more indicators. Through existing or novel data that display spatial and temporal heterogeneity in social well-being, conservation scientists, planners, and decision makers may measure, benchmark, map, and integrate these data within conservation planning processes. Selecting indicators and integrating these data into conservation planning is an iterative, participatory process tailored to the local context and planning goals. Social well-being data complement biophysical and threat-oriented social data within conservation planning processes to inform decisions regarding where and how to conserve biodiversity, provide a structure for exploring socioecological relationships, and to foster adaptive management. Building upon existing conservation planning methods and insights from multiple disciplines, this approach to putting people on the map can readily merge with current planning practices to facilitate more rigorous decision making. PMID:25102957

  15. Formulation of consumables management models. Development approach for the mission planning processor working model

    NASA Technical Reports Server (NTRS)

    Connelly, L. C.

    1977-01-01

    The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.

  16. Patient Protection and Affordable Care Act; establishment of exchanges and qualified health plans; Small Business Health Options Program. Final rule.

    PubMed

    2013-06-01

    This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act) related to the Small Business Health Options Program (SHOP). Specifically, this final rule amends existing regulations regarding triggering events and special enrollment periods for qualified employees and their dependents and implements a transitional policy regarding employees' choice of qualified health plans (QHPs) in the SHOP. PMID:23734400

  17. Computer-aided liver surgery planning: an augmented reality approach

    NASA Astrophysics Data System (ADS)

    Bornik, Alexander; Beichel, Reinhard; Reitinger, Bernhard; Gotschuli, Georg; Sorantin, Erich; Leberl, Franz W.; Sonka, Milan

    2003-05-01

    Surgical resection of liver tumors requires a detailed three-dimensional understanding of a complex arrangement of vasculature, liver segments and tumors inside the liver. In most cases, surgeons need to develop this understanding by looking at sequences of axial images from modalities like X-ray computed tomography. A system for liver surgery planning is reported that enables physicians to visualize and refine segmented input liver data sets, as well as to simulate and evaluate different resections plans. The system supports surgeons in finding the optimal treatment strategy for each patient and eases the data preparation process. The use of augmented reality contributes to a user-friendly design and simplifies complex interaction with 3D objects. The main function blocks developed so far are: basic augmented reality environment, user interface, rendering, surface reconstruction from segmented volume data sets, surface manipulation and quantitative measurement toolkit. The flexible design allows to add functionality via plug-ins. First practical evaluation steps have shown a good acceptance. Evaluation of the system is ongoing and future feedback from surgeons will be collected and used for design refinements.

  18. A scenario planning approach for disasters on Swiss road network

    NASA Astrophysics Data System (ADS)

    Mendes, G. A.; Axhausen, K. W.; Andrade, J. S.; Herrmann, H. J.

    2014-05-01

    We study a vehicular traffic scenario on Swiss roads in an emergency situation, calculating how sequentially roads block due to excessive traffic load until global collapse (gridlock) occurs and in this way displays the fragilities of the system. We used a database from Bundesamt für Raumentwicklung which contains length and maximum allowed speed of all roads in Switzerland. The present work could be interesting for government agencies in planning and managing for emergency logistics for a country or a big city. The model used to generate the flux on the Swiss road network was proposed by Mendes et al. [Physica A 391, 362 (2012)]. It is based on the conservation of the number of vehicles and allows for an easy and fast way to follow the formation of traffic jams in large systems. We also analyze the difference between a nonlinear and a linear model and the distribution of fluxes on the Swiss road.

  19. Approaches to defining reference regimes for river restoration planning

    NASA Astrophysics Data System (ADS)

    Beechie, T. J.

    2014-12-01

    Reference conditions or reference regimes can be defined using three general approaches, historical analysis, contemporary reference sites, and theoretical or empirical models. For large features (e.g., floodplain channels and ponds) historical data and maps are generally reliable. For smaller features (e.g., pools and riffles in small tributaries), field data from contemporary reference sites are a reasonable surrogate for historical data. Models are generally used for features that have no historical information or present day reference sites (e.g., beaver pond habitat). Each of these approaches contributes to a watershed-wide understanding of current biophysical conditions relative to potential conditions, which helps create not only a guiding vision for restoration, but also helps quantify and locate the largest or most important restoration opportunities. Common uses of geomorphic and biological reference conditions include identifying key areas for habitat protection or restoration, and informing the choice of restoration targets. Examples of use of each of these three approaches to define reference regimes in western USA illustrate how historical information and current research highlight key restoration opportunities, focus restoration effort in areas that can produce the largest ecological benefit, and contribute to estimating restoration potential and assessing likelihood of achieving restoration goals.

  20. Euro 2012 European Football Championship Finals: planning for a health legacy.

    PubMed

    Smallwood, Catherine A H; Arbuthnott, Katherine G; Banczak-Mysiak, Barbara; Borodina, Mariya; Coutinho, Ana Paula; Payne-Hallström, Lara; Lipska, Elzbieta; Lyashko, Viktor; Miklasz, Miroslaw; Miskiewicz, Paulina; Nitzan, Dorit; Pokanevych, Igor; Posobkiewicz, Marek; Rockenschaub, Gerald; Sadkowska-Todys, Malgorzata; Sinelnik, Svetlana; Smiley, Daniel; Tomialoic, Rysard; Yurchenko, Volodimir; Memish, Ziad A; Heymann, David; Endericks, Tina; McCloskey, Brian; Zumla, Alimuddin; Barbeschi, Maurizio

    2014-06-14

    The revised international health regulations offer a framework that can be used by host countries to organise public health activities for mass gatherings. From June 8, to July 1, 2012, Poland and Ukraine jointly hosted the Union of European Football Associations European Football Championship Finals (Euro 2012). More than 8 million people from around the world congregated to watch the games. Host countries and international public health agencies planned extensively to assess and build capacity in the host countries and to develop effective strategies for dissemination of public health messages. The effectiveness of public health services was maximised through rapid sharing of information between parties, early use of networks of experienced individuals, and the momentum of existing national health programmes. Organisers of future mass gatherings for sporting events should share best practice and their experiences through the WHO International Observer Program. Research about behaviour of large crowds is needed for crowd management and the evidence base translated into practice. A framework to measure and evaluate the legacy of Euro 2012 is needed based on the experiences and the medium-term and long-term benefits of the tournament. PMID:24857705

  1. Approaches to determining Final Ecosystem Goods and Services: Benefits and Beneficiaries

    EPA Science Inventory

    By nature, the concept of ‘Final’ Ecosystem Goods and Services (FEGS) poses the question; to what or to whom are these goods and services final? We identify two main approaches theoreticians and practitioners are using to define and perceive FEGS (note: we recognize t...

  2. Patient Protection and Affordable Care Act; establishment of the Multi-State Plan Program for the Affordable Insurance Exchanges. Final rule.

    PubMed

    2014-02-24

    The U.S. Office of Personnel Management (OPM) is issuing a final rule implementing modifications to the Multi-State Plan (MSP) Program based on the experience of the Program to date. OPM established the MSP Program pursuant to the Affordable Care Act. This rule clarifies the approach used to enforce the applicable standards of the Affordable Care Act with respect to health insurance issuers that contract with OPM to offer MSP options; amends MSP standards related to coverage area, benefits, and certain contracting provisions under section 1334 of the Affordable Care Act; and makes non-substantive technical changes. PMID:25735057

  3. A graph-based ant colony optimization approach for process planning.

    PubMed

    Wang, JinFeng; Fan, XiaoLiang; Wan, Shuting

    2014-01-01

    The complex process planning problem is modeled as a combinatorial optimization problem with constraints in this paper. An ant colony optimization (ACO) approach has been developed to deal with process planning problem by simultaneously considering activities such as sequencing operations, selecting manufacturing resources, and determining setup plans to achieve the optimal process plan. A weighted directed graph is conducted to describe the operations, precedence constraints between operations, and the possible visited path between operation nodes. A representation of process plan is described based on the weighted directed graph. Ant colony goes through the necessary nodes on the graph to achieve the optimal solution with the objective of minimizing total production costs (TPC). Two cases have been carried out to study the influence of various parameters of ACO on the system performance. Extensive comparative experiments have been conducted to demonstrate the feasibility and efficiency of the proposed approach. PMID:24995355

  4. A Graph-Based Ant Colony Optimization Approach for Process Planning

    PubMed Central

    Wang, JinFeng; Fan, XiaoLiang; Wan, Shuting

    2014-01-01

    The complex process planning problem is modeled as a combinatorial optimization problem with constraints in this paper. An ant colony optimization (ACO) approach has been developed to deal with process planning problem by simultaneously considering activities such as sequencing operations, selecting manufacturing resources, and determining setup plans to achieve the optimal process plan. A weighted directed graph is conducted to describe the operations, precedence constraints between operations, and the possible visited path between operation nodes. A representation of process plan is described based on the weighted directed graph. Ant colony goes through the necessary nodes on the graph to achieve the optimal solution with the objective of minimizing total production costs (TPC). Two cases have been carried out to study the influence of various parameters of ACO on the system performance. Extensive comparative experiments have been conducted to demonstrate the feasibility and efficiency of the proposed approach. PMID:24995355

  5. 77 FR 42761 - Final Environmental Impact Statement for the Oil and Gas Management Plan at Big South Fork...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR National Park Service Final Environmental Impact Statement for the Oil and Gas Management Plan at Big South... Blount, Big South Fork National River ] and Recreation Area and Obed Wild and Scenic River Chief...

  6. 77 FR 24483 - Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Energy Regulatory Commission Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting... 14, 2011. d. Applicant: Wausau Paper Mills, LLC. e. Name of Project: Rhinelander Hydroelectric... Power Act, 16 U.S.C. 791a-825r. h. Applicant Contact: Mr. Tim Hasbargen, Wausau Paper Mills, LLC,...

  7. 78 FR 3025 - St. Vincent National Wildlife Refuge, FL; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... Fish and Wildlife Service St. Vincent National Wildlife Refuge, FL; Final Comprehensive Conservation Plan and Finding of No Significant Impact for the Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the Fish and Wildlife Service...

  8. 77 FR 43405 - Final Standard Review Plan, Branch Technical Position 7-19 on Guidance for Evaluation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... COMMISSION Final Standard Review Plan, Branch Technical Position 7-19 on Guidance for Evaluation of Diversity... ``Guidance for Evaluation of Diversity and Defense-in-Depth in Digital Computer-Based Instrumentation and Control Systems.'' This BTP is to be cited as the acceptance criteria for Diversity and...

  9. A Knowledge-Based Approach to Improving and Homogenizing Intensity Modulated Radiation Therapy Planning Quality Among Treatment Centers: An Example Application to Prostate Cancer Planning

    SciTech Connect

    Good, David; Lo, Joseph; Lee, W. Robert; Wu, Q. Jackie; Yin, Fang-Fang; Das, Shiva K.

    2013-09-01

    Purpose: Intensity modulated radiation therapy (IMRT) treatment planning can have wide variation among different treatment centers. We propose a system to leverage the IMRT planning experience of larger institutions to automatically create high-quality plans for outside clinics. We explore feasibility by generating plans for patient datasets from an outside institution by adapting plans from our institution. Methods and Materials: A knowledge database was created from 132 IMRT treatment plans for prostate cancer at our institution. The outside institution, a community hospital, provided the datasets for 55 prostate cancer cases, including their original treatment plans. For each “query” case from the outside institution, a similar “match” case was identified in the knowledge database, and the match case’s plan parameters were then adapted and optimized to the query case by use of a semiautomated approach that required no expert planning knowledge. The plans generated with this knowledge-based approach were compared with the original treatment plans at several dose cutpoints. Results: Compared with the original plan, the knowledge-based plan had a significantly more homogeneous dose to the planning target volume and a significantly lower maximum dose. The volumes of the rectum, bladder, and femoral heads above all cutpoints were nominally lower for the knowledge-based plan; the reductions were significantly lower for the rectum. In 40% of cases, the knowledge-based plan had overall superior (lower) dose–volume histograms for rectum and bladder; in 54% of cases, the comparison was equivocal; in 6% of cases, the knowledge-based plan was inferior for both bladder and rectum. Conclusions: Knowledge-based planning was superior or equivalent to the original plan in 95% of cases. The knowledge-based approach shows promise for homogenizing plan quality by transferring planning expertise from more experienced to less experienced institutions.

  10. A greedy-navigator approach to navigable city plans

    NASA Astrophysics Data System (ADS)

    Lee, Sang Hoon; Holme, Petter

    2013-01-01

    We use a set of four theoretical navigability indices for street maps to investigate the shape of the resulting street networks, if they are grown by optimizing these indices. The indices compare the performance of simulated navigators (having a partial information about the surroundings, like humans in many real situations) to the performance of optimally navigating individuals. We show that our simple greedy shortcut construction strategy generates the emerging structures that are different from real road network, but not inconceivable. The resulting city plans, for all navigation indices, share common qualitative properties such as the tendency for triangular blocks to appear, while the more quantitative features, such as degree distributions and clustering, are characteristically different depending on the type of metrics and routing strategies. We show that it is the type of metrics used which determines the overall shapes characterized by structural heterogeneity, but the routing schemes contribute to more subtle details of locality, which is more emphasized in case of unrestricted connections when the edge crossing is allowed.

  11. Burrell, Pennsylvania, vicinty property Long-Term Surveillance Plan. Final report

    SciTech Connect

    1993-09-01

    The purpose of this document is to establish elements of the US Department of Energy (DOE) Long-Term Surveillance Plan (LTSP) for the Burrell, Pennsylvania, vicinity property. The US Nuclear Regulatory Commission (NRC) will use this plan to support the issuance of a license for the long-term surveillance and maintenance of the Burrell vicinity property. The DOE and the NRC previously reached agreement regarding the issuance of a license for the Burrell vicinity property. This is a departure from the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, which requires the licensing only of disposal sites, not vicinity properties. However, given the unusually large volume of wastes and the distance from the Canonsburg disposal cell of the Burrell vicinity property, it was agreed that a license for a designed disposal cell with surveillance requirements constituted a reasonable and prudent approach in keeping with the spirit of UMTRCA. The Burrell vicinity property covers approximately 29 hectares (72 acres). Disposal of the 10,500 tonnes (I 1,600 tons) of residual radioactive material (RRM) removed from the Canonsburg Uranium Mill Tailings Remedial Action (UMTRA) Project site took place within an approximately 0.6-hectare (1.6-acre) section in the western portion and an approximately 0.6-hectare (1.6-acre) section in the eastern portion of the Burrell vicinity property. The RRM was brought in as fill for under the ConRail railroad tracks. The excess RRM was placed in a storage location adjacent to the Conemaugh River at Burrell, which was later added to the disposal area. The disposal area contains a total of 78,000 tonnes (86,000 tons) of RRM.

  12. A Co-Equals Team Approach to Planning, Managing, and Reporting an Evaluation.

    ERIC Educational Resources Information Center

    Stevens, Floraline I.

    An innovative approach to planning, managing, and reporting evaluations was created by a need for conducting an effective evaluation in a bureaucratic setting where credibility was important. A more comprehensive and all-inclusive evaluation results when one person's evaluation perspective is expanded to include other approaches and viewpoints. An…

  13. Pockets...A Unit Approach to Planning Instruction Related to the State Kindergarten Objectives.

    ERIC Educational Resources Information Center

    Corley, Rhonda M.; And Others

    An addendum to the larger publication entitled "The Kangaroo Book," this document describes a unit approach to planning kindergarten curriculum and offers three sammple units. Exploration of the unit approach includes discussions of topic, concepts, large and small group experiences; descriptions of learning center activities; techniques for…

  14. Mobilization plan for the Y-12 9409-5 tank storage facility RCRA closure plan. Final report. Revision 1

    SciTech Connect

    1993-11-01

    This mobilization plan identifies the activities and equipment necessary to begin the field sampling for the Oak Ridge Y-12 9409-5 Diked Tank Storage Facility (DTSF) Resource Conservation and Recovery Act (RCRA) closure. Elements of the plan outline the necessary components of each mobilization task and identify whether SAIC or the Martin Marietta Energy Systems, Inc. Y-12 Environmental Restoration Division will be responsible for task coordination. Field work will be conducted in two phases: mobilization phase and soil sampling phase. Training and medical monitoring, access, permits and passes, decontamination/staging area, equipment, and management are covered in this document.

  15. Research in knowledge representation for natural language communication and planning assistance. Final report, 18 March 1985-30 September 1988

    SciTech Connect

    Goodman, B.A.; Grosz, B.; Haas, A.; Litman, D.; Reinhardt, T.

    1988-11-01

    BBN's DARPA project in Knowledge Representation for Natural Language Communication and Planning Assistance has two primary objectives: 1) To perform research on aspects of the interaction between users who are making complex decisions and systems that are assisting them with their task. In particular, this research is focused on communication and the reasoning required for performing its underlying task of discourse processing, planning, and plan recognition and communication repair. 2) Based on the research objectives to build tools for communication, plan recognition, and planning assistance and for the representation of knowledge and reasoning that underlie all of these processes. This final report summarizes BBN's research activities performed under this contract in the areas of knowledge representation and speech and natural language. In particular, the report discusses the work in the areas of knowledge representation, planning, and discourse modeling. We describe a parallel truth maintenance system. We provide an extension to the sentential theory of propositional attitudes by adding a sentential semantics. The report also contains a description of our research in discourse modelling in the areas of planning and plan recognition.

  16. Commitment to Student Retention: A Plan for Success. Final Report of the Retention Task Force.

    ERIC Educational Resources Information Center

    Lettman, Dennis

    A retention taskforce was established at Sinclair Community College (SCC) in Ohio to develop a plan to increase student retention. The 24-member taskforce, representing key areas within the college, worked for 15 months to prepare the plan. The plan was designed to be comprehensive, touching upon all points where the students interact with the…

  17. CABPRO: An expert system for process planning multiwire cables. Final report

    SciTech Connect

    Schaefer, R.M.

    1994-04-01

    CABPRO (CABle PROcessor) is a set of computer programs using Artificial Intelligence programming to automatically generate process plans and work instructions in support of the manufacture of multiwire cables. Development of these programs required selecting appropriate hardware and software tools, defining engineering process planning activities, acquiring and representing process planning knowledge, and creating a prototype system. A successful prototype was developed and demonstrated.

  18. National Data Program for the Marine Environment Technical Development Plan. Final Report, Volume Two.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)

  19. Family planning and sex education: the Chinese approach.

    PubMed

    Fraser, S E

    1977-03-01

    The limitation of population growth in China to about 1.7% annually is, in large part, the result of changing sexual norms which have been brought about by community-wide sexual education. These changes include elevating the status of women, dismissing the traditional striving for male children as "old fashioned," and emphasizing responsible parenthood. About 6% of China's population is made up of minority peoples, some 54 distinctive groups including a few such as the Khalkhas and Sibos who have virtually been saved from extinction during the past 25 years. For these groups the growth rate is 6% and the central government in Peking stresses to visitors that for minorities there is no limitation of family size but that health of the mother is stressed. Conversations with Chinese health workers indicate that rural women are much more in favor of family planning than their husbands and are much more willing to be sterilized when the acceptable family size of 2 or 3 children is reached. However, men are becoming more willing to use condoms which are available without cost from village health workers. There is little sex education in the schools. Physiology is included as a minor part of general biology. Young people are cautioned not to "fall in love" at too early an age or else they will not keep their minds on their studies and will get married too early. Emphasis is on late marriage, 25 for women and 27 for men. Only a modest glance at population or sexually oriented topics are encouraged until marriage is contemplated. Then sex education is given in great variety and detail. It is the opinion of doctors and health workers that sex education is a matter for the married, not the single. Chinese society has little external sexual stimuli, nudity or seminudity is not acceptable except at the beach or the swimming pool, and the young people are generally taught to be circumspect. There is none of the advertising which permeates Western culture. It is understandable

  20. Carvacrol Codrugs: A New Approach in the Antimicrobial Plan

    PubMed Central

    Fornasari, Erika; Di Stefano, Antonio; Cerasa, Laura Serafina; Marinelli, Lisa; Turkez, Hasan; Di Campli, Emanuela; Di Bartolomeo, Soraya; Robuffo, Iole; Cellini, Luigina

    2015-01-01

    Objective The increasing prevalence of antibiotic-resistant bacterial infections led to identify alternative strategies for a novel therapeutic approach. In this study, we synthesized ten carvacrol codrugs – obtained linking the carvacrol hydroxyl group to the carboxyl moiety of sulphur-containing amino acids via an ester bond – to develop novel compounds with improved antimicrobial and antibiofilm activities and reduced toxicity respect to carvacrol alone. Method All carvacrol codrugs were screened against a representative panel of Gram positive (S. aureus and S. epidermidis), Gram negative (E. coli and P. aeruginosa) bacterial strains and C. albicans, using broth microdilution assays. Findings Results showed that carvacrol codrug 4 possesses the most notable enhancement in the anti-bacterial activity displaying MIC and MBC values equal to 2.5 mg/mL for all bacterial strains, except for P. aeruginosa ATCC 9027 (MIC and MBC values equal to 5 mg/mL and 10 mg/mL, respectively). All carvacrol codrugs 1-10 revealed good antifungal activity against C. albicans ATCC 10231. The cytotoxicity assay showed that the novel carvacrol codrugs did not produce human blood hemolysis at their MIC values except for codrugs 8 and 9. In particular, deepened experiments performed on carvacrol codrug 4 showed an interesting antimicrobial effect on the mature biofilm produced by E. coli ATCC 8739, respect to the carvacrol alone. The antimicrobial effects of carvacrol codrug 4 were also analyzed by TEM evidencing morphological modifications in S. aureus, E. coli, and C. albicans. Conclusion The current study presents an insight into the use of codrug strategy for developing carvacrol derivatives with antibacterial and antibiofilm potentials, and reduced cytotoxicity. PMID:25859852

  1. A Simplified Approach To Include Essential Facilities In Risk Scenarios For Civil Defence Plans.

    NASA Astrophysics Data System (ADS)

    González, M.; Susagna, T.; Goula, X.; Roca, A.; Safina, S.

    Given the importance of essential facilities in an earthquake crisis, it is recommended that detailed studies for assessing their functional vulnerability should be carried out. Although there have been many experiences in past earthquakes showing the problems associated to the damages to these facilities, like hospitals and police and firemen departments, many civil defence plans do not take into account their vulnerability. In some cases the reason is that there has not been opportunity to perform detailed vulnerability studies for these buildings before the issue of the prevention plans. A simplified statistical approach for the quick evaluation of the functional vulnerability of firemen stations and hospitals has been developed. This method allows these building to be at least considered in a first approach within the emergency plans. The method has been applied to facilities in Catalonia, Spain and have been incorporated to the recent developed plans of the Civil Defence department.

  2. A Logical Approach to Designing Safety Test Plans for Space Nuclear Systems

    NASA Astrophysics Data System (ADS)

    Coleman, James R.

    2004-02-01

    This paper presents a logical approach to designing a safety test plan for a space nuclear system. It is pointed out that two important facts need to underlie the development of a test plan: first, that sequential insults and the accumulation of damage are the rule; and second that the response of the nuclear system is stochastic (i.e., for any given set of conditions a probabilistic range of outcomes will occur regardless of the state of our knowledge). Because of these facts a deterministic approach can only be a starting point. The substance of the approach consists of undertaking and documenting three basic efforts: (1) a description of the analysts view of the problem and how it fits into the safety analysis, (2) a formal documentation of the purpose and requirements of the test plan (or test), and (3) an assessment of the use or usefulness of existing test data.

  3. A Logical Approach to Designing Safety Test Plans for Space Nuclear Systems

    SciTech Connect

    Coleman, James R

    2004-02-04

    This paper presents a logical approach to designing a safety test plan for a space nuclear system. It is pointed out that two important facts need to underlie the development of a test plan: first, that sequential insults and the accumulation of damage are the rule; and second that the response of the nuclear system is stochastic (i.e., for any given set of conditions a probabilistic range of outcomes will occur regardless of the state of our knowledge). Because of these facts a deterministic approach can only be a starting point. The substance of the approach consists of undertaking and documenting three basic efforts: (1) a description of the analysts view of the problem and how it fits into the safety analysis, (2) a formal documentation of the purpose and requirements of the test plan (or test), and (3) an assessment of the use or usefulness of existing test data.

  4. Inspection planning development: An evolutionary approach using reliability engineering as a tool

    NASA Technical Reports Server (NTRS)

    Graf, David A.; Huang, Zhaofeng

    1994-01-01

    This paper proposes an evolutionary approach for inspection planning which introduces various reliability engineering tools into the process and assess system trade-offs among reliability, engineering requirement, manufacturing capability and inspection cost to establish an optimal inspection plan. The examples presented in the paper illustrate some advantages and benefits of the new approach. Through the analysis, reliability and engineering impacts due to manufacturing process capability and inspection uncertainty are clearly understood; the most cost effective and efficient inspection plan can be established and associated risks are well controlled; some inspection reductions and relaxations are well justified; and design feedbacks and changes may be initiated from the analysis conclusion to further enhance reliability and reduce cost. The approach is particularly promising as global competitions and customer quality improvement expectations are rapidly increasing.

  5. TH-C-BRD-10: An Evaluation of Three Robust Optimization Approaches in IMPT Treatment Planning

    SciTech Connect

    Cao, W; Randeniya, S; Mohan, R; Zaghian, M; Kardar, L; Lim, G; Liu, W

    2014-06-15

    Purpose: Various robust optimization approaches have been proposed to ensure the robustness of intensity modulated proton therapy (IMPT) in the face of uncertainty. In this study, we aim to investigate the performance of three classes of robust optimization approaches regarding plan optimality and robustness. Methods: Three robust optimization models were implemented in our in-house IMPT treatment planning system: 1) L2 optimization based on worst-case dose; 2) L2 optimization based on minmax objective; and 3) L1 optimization with constraints on all uncertain doses. The first model was solved by a L-BFGS algorithm; the second was solved by a gradient projection algorithm; and the third was solved by an interior point method. One nominal scenario and eight maximum uncertainty scenarios (proton range over and under 3.5%, and setup error of 5 mm for x, y, z directions) were considered in optimization. Dosimetric measurements of optimized plans from the three approaches were compared for four prostate cancer patients retrospectively selected at our institution. Results: For the nominal scenario, all three optimization approaches yielded the same coverage to the clinical treatment volume (CTV) and the L2 worst-case approach demonstrated better rectum and bladder sparing than others. For the uncertainty scenarios, the L1 approach resulted in the most robust CTV coverage against uncertainties, while the plans from L2 worst-case were less robust than others. In addition, we observed that the number of scanning spots with positive MUs from the L2 approaches was approximately twice as many as that from the L1 approach. This indicates that L1 optimization may lead to more efficient IMPT delivery. Conclusion: Our study indicated that the L1 approach best conserved the target coverage in the face of uncertainty but its resulting OAR sparing was slightly inferior to other two approaches.

  6. Simulated vortex encounters by a twin-engine commercial transport aircraft during final approach

    NASA Technical Reports Server (NTRS)

    Hastings, E. C., Jr.; Keyser, G. L., Jr.

    1980-01-01

    Piloted simulations of encounters with vortices of various ages and degrees of attenuation were performed with the Visual Motion Simulator. In the simulations, a twin-engine, commercial transport on final approach encountered the modeled vortices of a four-engine, wide-body, commercial transport. The data in this report show the effect of vortex age and ground effect on the severity of the initial upset, as well as the effect of the vortex encounters on the landing capability.

  7. Final Report for Harvesting a New Wind Crop: Innovative Economic Approaches for Rural America

    SciTech Connect

    Susan Innis; Randy Udall; Project Officer - Keith Bennett

    2005-09-30

    Final Report for ''Harvesting a New Wind Crop: Innovative Economic Approaches for Rural America'': This project, ''Harvesting a New Wind Crop'', helped stimulate wind development by rural electric cooperatives and municipal utilities in Colorado. To date most of the wind power development in the United States has been driven by large investor-owned utilities serving major metropolitan areas. To meet the 5% by 2020 goal of the Wind Powering America program the 2,000 municipal and 900 rural electric cooperatives in the country must get involved in wind power development. Public power typically serves rural and suburban areas and can play a role in revitalizing communities by tapping into the economic development potential of wind power. One barrier to the involvement of public power in wind development has been the perception that wind power is more expensive than other generation sources. This project focused on two ways to reduce the costs of wind power to make it more attractive to public power entities. The first way was to develop a revenue stream from the sale of green tags. By selling green tags to entities that voluntarily support wind power, rural coops and munis can effectively reduce their cost of wind power. Western Resource Advocates (WRA) and the Community Office for Resource Efficiency (CORE) worked with Lamar Light and Power and Arkansas River Power Authority to develop a strategy to use green tags to help finance their wind project. These utilities are now selling their green tags to Community Energy, Inc., an independent for-profit marketer who in turn sells the tags to consumers around Colorado. The Lamar tags allow the University of Colorado-Boulder, the City of Boulder, NREL and other businesses to support wind power development and make the claim that they are ''wind-powered''. This urban-rural partnership is an important development for the state of Colorado's rural communities get the economic benefits of wind power and urban businesses are

  8. Coordinating robot motion, sensing, and control in plans. LDRD project final report

    SciTech Connect

    Xavier, P.G.; Brown, R.G.; Watterberg, P.A.

    1997-08-01

    The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The project considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.

  9. National Institute on Disability and Rehabilitation Research--Notice of Final Long-Range Plan for Fiscal Years 2005-2009. Federal Register, Part III: Department of Education

    ERIC Educational Resources Information Center

    National Archives and Records Administration, 2006

    2006-01-01

    The Assistant Secretary for Special Education and Rehabilitative Services (OSERS) publishes the Final Long-Range Plan (Final Plan) for the National Institute on Disability and Rehabilitation Research (NIDRR) for FY 2005 through 2009. As required by the Rehabilitation Act of 1973, as amended (Act), the Assistant Secretary takes this action to…

  10. 40 CFR 62.15065 - How do I comply with the increment of progress for submittal of a final control plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....15065 How do I comply with the increment of progress for submittal of a final control plan? For your... 40 Protection of Environment 8 2010-07-01 2010-07-01 false How do I comply with the increment of progress for submittal of a final control plan? 62.15065 Section 62.15065 Protection of...

  11. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    SciTech Connect

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  12. System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

    SciTech Connect

    Zhu, Charles

    2015-05-15

    In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information

  13. A strategic planning approach for operational-environmental tradeoff assessments in terminal areas

    NASA Astrophysics Data System (ADS)

    Jimenez, Hernando

    This thesis proposes the use of well established statistical analysis techniques, leveraging on recent developments in interactive data visualization capabilities, to quantitatively characterize the interactions, sensitivities, and tradeoffs prevalent in the complex behavior of airport operational and environmental performance. Within the strategic airport planning process, this approach is used in the assessment of airport performance under current/reference conditions, as well as in the evaluation of terminal area solutions under projected demand conditions. More specifically, customized designs of experiments are utilized to guide the intelligent selection and definition of modeling and simulation runs that will yield greater understanding, insight, and information about the inherent systemic complexity of a terminal area, with minimal computational expense. For the research documented in this thesis, a modeling and simulation environment was created featuring three primary components. First, a generator of schedules of operations, based primarily on previous work on aviation demand characterization, whereby growth factors and scheduling adjustment algorithms are applied on appropriate baseline schedules so as to generate notional operational sets representative of consistent future demand conditions. The second component pertains to the modeling and simulation of aircraft operations, defined by a schedule of operations, on the airport surface and within its terminal airspace. This component is a discrete event simulator for multiple queuing models that captures the operational architecture of the entire terminal area along with all the necessary operational logic pertaining to simulated Air Traffic Control (ATC) functions, rules, and standard practices. The third and final component is comprised of legacy aircraft performance, emissions and dispersion, and noise exposure modeling tools, that use the simulation history of aircraft movements to generate estimates

  14. 77 FR 74688 - Final Recovery Plan, First Revision; Mexican Spotted Owl

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-17

    ... Region. We made the draft plan available via a Federal Register notice published on June 24, 2011 (76 FR... Mexican spotted owl as a threatened species under the Act on March 16, 1993 (58 FR 14248). We designated critical habitat on August 31, 2004 (69 FR 53182). We originally completed a recovery plan for the...

  15. Ten Year Plan for the Redevelopment of Intellectual Disability Services: Consumers' Guide. Final Report.

    ERIC Educational Resources Information Center

    Neilson Associates Pty. Ltd., Melbourne (Australia).

    This consumers' guide provides an easily understandable, large print summary of the recommendations in a 10-year plan for changes in services to people with intellectual disabilities in Victoria, Australia. Twenty of the 250 recommendations of the plan are given in simplified language accompanied by illustrations, including recommendations for:…

  16. International Workshop on Communications in Family Planning Programs (Teheran, June 6-18, 1970). Final Report.

    ERIC Educational Resources Information Center

    Blake, Robert R., Ed.; Wolfe, Suzanne, R., Ed.

    This report presents some of the proceedings of a workshop on communications in family planning programs held in Teheran, Iran. A total of 82 participants from 15 Mid-Eastern and African countries attended. The purpose of the workshop was to assist each country to prepare a work plan for information and education activities related to population…

  17. 77 FR 74027 - Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-12

    ..., Yellowstone National Park, Idaho, Montana, and Wyoming AGENCY: National Park Service, Interior. ACTION: Notice... Winter Use Plan, Yellowstone National Park. SUMMARY: Pursuant to Sec. 102(2)(C) of the National... availability of the Amended Record of Decision for the Winter Use Plan for Yellowstone National......

  18. The Feasibility of Implementing a "Voucher Plan" in Seattle, Phase 2. Final Report.

    ERIC Educational Resources Information Center

    Washington Univ., Seattle. Bureau of School Service and Research.

    In February 1971, the Seattle School District received funds to conduct a study of the feasibility of implementing the education voucher plan in Seattle. The study was divided into two preliminary phases. Phase 1 conducted over a 4-month period, consisted of an investigation of the areas of the city where the plan could best be tested, an analysis…

  19. International Conference on Educational Planning (Paris, August 6-14, 1968). Final Report.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    The principal aims of the conference were to analyze the experience gained during the past 10 years in educational planning and development; to evaluate main problems and future trends; to suggest ways of improving educational planning; and to devise strategies for extending and improving education in all member States. Four major ideas emerged…

  20. Nebraska State Plan Career Education Project. Final Performance Report for Period Ending June 30, 1977.

    ERIC Educational Resources Information Center

    Nebraska State Dept. of Education, Lincoln.

    The Nebraska state career education plan was developed to assist individuals in developing essential educational and career skills for responsible functioning. The plan, linking the school and work world, extends chronologically: elementary level--career awareness, middle/junior high school level--career exploration, and senior high school…

  1. Streamlined approach for environmental restoration plan for corrective action unit 416, Mud Pit, Project Shoal Area

    SciTech Connect

    1997-07-01

    This plan addresses the actions necessary for the restoration and closure of the Project Shoal Area (PSA), Surface Corrective Action Unit (CAU) 416, Mud Pit (Corrective Action Site No. 57-09-01), a pit that was used to store effluent produced during drilling of the Post-Shot Borehole PS-1 in 1963. This plan describes the activities that will occur at the site and the steps that will be taken to gather enough data to obtain a notice of completion from the Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented with the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996) and the Industrial Sites Quality Assurance Project Plan (DOE/NV, 1994). The SAFER process is being employed at this CAU where enough information exists about the nature and extent of contamination to propose an appropriate corrective action without completing a Corrective Action Decision Document and Corrective Action Plan. This process combines elements of the Data Quality Objective (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. This has already been completed for the mud pit so it will not be repeated here. The DQOs for the mud pit are presented in the Corrective Action Investigation Plan for Project Shoal Area, CAU No. 416 (DOE/NV, 1996). This observational approach provides a framework for managing uncertainty and planning decision making.

  2. Design and evaluation of an air traffic control Final Approach Spacing Tool

    NASA Technical Reports Server (NTRS)

    Davis, Thomas J.; Erzberger, Heinz; Green, Steven M.; Nedell, William

    1991-01-01

    This paper describes the design and simulator evaluation of an automation tool for assisting terminal radar approach controllers in sequencing and spacing traffic onto the final approach course. The automation tool, referred to as the Final Approach Spacing Tool (FAST), displays speed and heading advisories for arriving aircraft as well as sequencing information on the controller's radar display. The main functional elements of FAST are a scheduler that schedules and sequences the traffic, a four-dimensional trajectory synthesizer that generates the advisories, and a graphical interface that displays the information to the controller. FAST has been implemented on a high-performance workstation. It can be operated as a stand-alone in the terminal radar approach control facility or as an element of a system integrated with automation tools in the air route traffic control center. FAST was evaluated by experienced air traffic controllers in a real-time air traffic control simulation. simulation results summarized in the paper show that the automation tools significantly reduced controller work load and demonstrated a potential for an increase in landing rate.

  3. IPIP: A new approach to inverse planning for HDR brachytherapy by directly optimizing dosimetric indices

    SciTech Connect

    Siauw, Timmy; Cunha, Adam; Atamtuerk, Alper; Hsu, I-Chow; Pouliot, Jean; Goldberg, Ken

    2011-07-15

    Purpose: Many planning methods for high dose rate (HDR) brachytherapy require an iterative approach. A set of computational parameters are hypothesized that will give a dose plan that meets dosimetric criteria. A dose plan is computed using these parameters, and if any dosimetric criteria are not met, the process is iterated until a suitable dose plan is found. In this way, the dose distribution is controlled by abstract parameters. The purpose of this study is to develop a new approach for HDR brachytherapy by directly optimizing the dose distribution based on dosimetric criteria. Methods: The authors developed inverse planning by integer program (IPIP), an optimization model for computing HDR brachytherapy dose plans and a fast heuristic for it. They used their heuristic to compute dose plans for 20 anonymized prostate cancer image data sets from patients previously treated at their clinic database. Dosimetry was evaluated and compared to dosimetric criteria. Results: Dose plans computed from IPIP satisfied all given dosimetric criteria for the target and healthy tissue after a single iteration. The average target coverage was 95%. The average computation time for IPIP was 30.1 s on an Intel(R) Core{sup TM}2 Duo CPU 1.67 GHz processor with 3 Gib RAM. Conclusions: IPIP is an HDR brachytherapy planning system that directly incorporates dosimetric criteria. The authors have demonstrated that IPIP has clinically acceptable performance for the prostate cases and dosimetric criteria used in this study, in both dosimetry and runtime. Further study is required to determine if IPIP performs well for a more general group of patients and dosimetric criteria, including other cancer sites such as GYN.

  4. Fees on health insurance policies and self-insured plans for the patient-centered outcomes research trust fund. Final regulations.

    PubMed

    2012-12-01

    This document contains final regulations that implement and provide guidance on the fees imposed by the Patient Protection and Affordable Care Act on issuers of certain health insurance policies and plan sponsors of certain self-insured health plans to fund the Patient-Centered Outcomes Research Trust Fund. These final regulations affect the issuers and plan sponsors that are directed to pay those fees. PMID:23227570

  5. WastePlan model implementation for New York State. Final report

    SciTech Connect

    Visalli, J.R.; Blackman, D.A.

    1995-07-01

    WastePlan is a computer software tool that models solid waste quantities, costs, and other parameters on a regional basis. The software was developed by the Tellus Institute, a nonprofit research and consulting firm. The project`s objective was to provide local solid waste management planners in New York State responsible to develop and implement comprehensive solid waste management plans authorized by the Solid Waste Management Act of 1988, with a WastePlan model specifically tailored to fit the demographic and other characteristics of New York State and to provide training and technical support to the users. Two-day workshops were held in 1992 to introduce planners to the existing versions; subsequently, extensive changes were made to the model and a second set of two-day workshops were held in 1993 to introduce planners to the enhanced version of WastePlan. Following user evaluations, WastePlan was further modified to allow users to model systems using a simplified version, and to incorporate report forms required by New York State. A post-project survey of trainees revealed limited regular use of software. Possible reasons include lack of synchronicity with NYSDEC planning process; lack of computer literacy and aptitude among trainees; hardware limitations; software user-friendliness; and the work environment of the trainees. A number of recommendations are made to encourage use of WastePlan by local solid waste management planners.

  6. 75 FR 21651 - Final Environmental Impact Statement; Prisoners Harbor Coastal Wetland Restoration Plan, Channel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ...Pursuant to Sec. 102(2)(C) of the National Environmental Policy Act of 1969, the National Park Service, Department of the Interior, has prepared a Final Environmental Impact Statement (EIS) assessing the potential impacts of restoring the coastal wetland and lower riparian corridor at Prisoners Harbor on Santa Cruz Island, Channel Island National Park. The Final EIS analyzes the effects of......

  7. 77 FR 39180 - Withdrawal of Direct Final Rule Revising the California State Implementation Plan, South Coast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ...: Withdrawal of direct final rule. SUMMARY: On June 1, 2012 (77 FR 32398), EPA published a direct final... proposal also published on June 1, 2012 (77 FR 32398), or repropose an alternative action. As stated in the... addition of 40 CFR 52.220 (c)(362)(i)(B)(2) published at 77 FR 32398 on June 1, 2012 is withdrawn as...

  8. A morphological adaptation approach to path planning inspired by slime mould

    NASA Astrophysics Data System (ADS)

    Jones, Jeff

    2015-04-01

    Path planning is a classic problem in computer science and robotics which has recently been implemented in unconventional computing substrates such as chemical reaction-diffusion computers. These novel computing schemes utilise the parallel spatial propagation of information and often use a two-stage method involving diffusive propagation to discover all paths and a second stage to highlight or visualise the path between two particular points in the arena. The true slime mould Physarum polycephalum is known to construct efficient transport networks between nutrients in its environment. These networks are continuously remodelled as the organism adapts its body plan to changing spatial stimuli. It can be guided towards attractant stimuli (nutrients, warm regions) and it avoids locations containing hazardous stimuli (light irradiation, repellents, or regions occupied by predatory threats). Using a particle model of slime mould we demonstrate scoping experiments which explore how path planning may be performed by morphological adaptation. We initially demonstrate simple path planning by a shrinking blob of virtual plasmodium between two attractant sources within a polygonal arena. We examine the case where multiple paths are required and the subsequent selection of a single path from multiple options. Collision-free paths are implemented via repulsion from the borders of the arena. Finally, obstacle avoidance is implemented by repulsion from obstacles as they are uncovered by the shrinking blob. These examples show proof-of-concept results of path planning by morphological adaptation which complement existing research on path planning in novel computing substrates.

  9. X-ray pulsars/Doppler integrated navigation for Mars final approach

    NASA Astrophysics Data System (ADS)

    Cui, Pingyuan; Wang, Shuo; Gao, Ai; Yu, Zhengshi

    2016-05-01

    The performance of the navigation system during the Mars final approach phase determines the initial accuracy of Mars entry phase, which is critical for a pin-point landing. An X-ray pulsars/Doppler integrated navigation strategy is proposed to improve the estimation accuracy of the spacecraft's entry state, as well as to enhance the autonomy, real-time and reliability. The navigation system uses the X-ray pulsar measurements and Doppler velocity measurements which are complementary to each other. The performance degradation in velocity estimation at the end of the final approach phase for X-ray pulsar based navigation can thus be eliminated. The nonlinearity of the system and the performance of Extended Kalman Filter are analyzed in this paper. Furthermore, in order to optimize the navigation scheme, a principle for navigation beacons selection based on the Fisher information matrix is used. Finally, a navigation scenario based on the 2012 encounter at Mars of Mars Science Laboratory spacecraft is considered to demonstrate the feasibility and accuracy of the proposed scheme. Simulation results also indicate that the proposed navigation scheme has reference value for the design of the future Mars explorations.

  10. Responses to Defense Cutbacks: The Community Planning Approach. Research and Evaluation Report Series 97-B.

    ERIC Educational Resources Information Center

    Social Policy Research Associates, Menlo Park, CA.

    Of the 19 projects conducted as part of the Defense Conversion Adjustment (DCA) Demonstration administered by the U.S. Department of Labor's Office of Work-Based Learning, 5 tested the community planning approach. The projects attempted to alleviate the negative impacts of defense cutbacks on communities, firms, and workers. The project sites…

  11. A Thematic Approach to the Institutional Self-Study: A Model for University Evaluation and Planning.

    ERIC Educational Resources Information Center

    O'Brien, Gregory M. St. L.; Waters, Gregory L.

    1983-01-01

    Describes the University of Michigan-Flint's program evaluation and planning effort, which used a thematic approach focusing on the liberal arts and sciences, the productive and technological environment, health and human services, and fine arts and cultural affairs. The effort involved external consultants, faculty surveys, and regional…

  12. Planning and Developing Open and Distance Learning : A Quality Assurance Approach. Radiological Studies in Distance Education.

    ERIC Educational Resources Information Center

    Melton, Reginald F.

    This book presents a blueprint for using a quality assurance-based approach to planning and developing open and distance learning (ODL) courses in the United Kingdom. The following are among the specific topics discussed: (1) typical aims of ODL (opening access to education; responding to student needs; designing self-study materials; student…

  13. 7 CFR 220.8 - Nutrition standards and menu planning approaches for breakfasts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... disability under 7 CFR part 15b.3 and whose disability restricts their diet. Substitutions must be made on a... 7 Agriculture 4 2011-01-01 2011-01-01 false Nutrition standards and menu planning approaches for... NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM §...

  14. 7 CFR 220.23 - Nutrition standards and menu planning approaches for breakfasts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... disability under 7 CFR part 15b.3 and whose disability restricts their diet. Substitutions must be made on a... 7 Agriculture 4 2014-01-01 2014-01-01 false Nutrition standards and menu planning approaches for... AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST...

  15. 7 CFR 220.8 - Nutrition standards and menu planning approaches for breakfasts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... disability under 7 CFR part 15b.3 and whose disability restricts their diet. Substitutions must be made on a... 7 Agriculture 4 2010-01-01 2010-01-01 false Nutrition standards and menu planning approaches for... NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM §...

  16. 7 CFR 220.23 - Nutrition standards and menu planning approaches for breakfasts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... disability under 7 CFR part 15b.3 and whose disability restricts their diet. Substitutions must be made on a... 7 Agriculture 4 2013-01-01 2013-01-01 false Nutrition standards and menu planning approaches for... AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST...

  17. 7 CFR 220.8 - Nutrition standards and menu planning approaches for breakfasts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... disability under 7 CFR part 15b.3 and whose disability restricts their diet. Substitutions must be made on a... 7 Agriculture 4 2012-01-01 2012-01-01 false Nutrition standards and menu planning approaches for... NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM §...

  18. Emergency Planning Guidelines for Campus Health Services: An All-Hazards Approach

    ERIC Educational Resources Information Center

    Journal of American College Health, 2011

    2011-01-01

    This document, written collaboratively by members of ACHA's Emerging Public Health Threats and Emergency Response Coalition and Campus Safety and Violence Coalition, is designed to assist members of the college health community in planning for emergencies using an all-hazards approach. Its perspective is both macro and micro, beginning with a…

  19. Administration by Objectives: A Systematic Approach to Educational Planning in Virginia. Report of a Study.

    ERIC Educational Resources Information Center

    Holmes, George W., III; Seawell, William H.

    This report presents (1) details of a program for educational administration by objectives and (2) the results of such a program developed by the Virginia State Department of Education to upgrade the quality of education in the public schools of that State. Administration by objectives is a systematic approach to education planning using…

  20. Beyond Lip Service: A Council Approach to Planning for Behaviour Change

    ERIC Educational Resources Information Center

    Collier, Grahame; Smith, Phil

    2009-01-01

    The Council of the City of Sydney--like many other councils around Australia--has embarked on a whole-of-council approach to establishing sustainable behaviours amongst its residents. In developing its "Residential Environmental Action Plan"--designed to motivate and bring about real change in resident choices and behaviours--the City sought to…

  1. Patient Activities Planning and Progress Noting a Humanistic Integrated-Team Approach.

    ERIC Educational Resources Information Center

    Muilenburg, Ted

    This document outlines a system for planning recreation therapy, documenting progress, and relating the entire process to a team approach which includes patient assessment and involvement. The recreation program is seen as therapeutic, closely related to the total medical treatment program. The model is designed so that it can be adapted to almost…

  2. University Strategic Planning and the Foresight/Futures Approach: An Irish Case Study

    ERIC Educational Resources Information Center

    Munck, Ronaldo; McConnell, Gordon

    2009-01-01

    The contemporary university operates within a global context characterized by ever-increasing uncertainty and complexity. Strategic planning must, therefore, be cognizant of future trends and how those trends will affect the university by creating both threats and opportunities. Our hypothesis is that an approach we refer to as "strategic…

  3. Oil-spill contingency planning: National status. A report to the President. Final report

    SciTech Connect

    Not Available

    1990-10-01

    The report examines the Nation's oil spill preparedness and response system in the wake of the Exxon Valdez disaster. It describes the nationwide oil spill response system, including the Federal Government's National Response System; the status of Federal, state, local and industry contingency planning; the adequacy of exercises testing oil spill plans; the effectiveness of oil spill contingency plans; and the development, response, and shortfall assessment of worst-case scenarios. The document also addresses key environmental and health concerns, including the potential for contamination of the food chain, the emotional and social stress that accompany significant spills, and strategies for mitigating these hazards. An extensive set of appendices summarizes regional response team contingency plans. The report emphasizes that prevention activities remain the best protection against oil spills, regardless of the effectiveness of response capabilities.

  4. 77 FR 37432 - Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... Springfield Plateau Regional Restoration Plan and Environmental Assessment (77 FR 1717). The public comment... Finding of No Significant Impact (FONSI). The U.S. Department of the Interior (DOI), acting through the...

  5. Health and safety plan, Kalakaket Creek, Radion Relay Station, Alaska. Final report

    SciTech Connect

    Not Available

    1994-09-01

    This Health and Safety Plan provides guidance for safe operations for field crew members performing activities at the Galena AFS and Campion AFS. It includes site descriptions, possible hazards, protective measures, and emergency procedures.

  6. 75 FR 36064 - Stellwagen Bank National Marine Sanctuary Final Revised Management Plan: Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ....noaa.gov . For a hard copy or data CD of the plan contact the sanctuary office at the contact number... FURTHER INFORMATION CONTACT: Anne Smrcina, Stellwagen Bank National Marine Sanctuary, 175 Edward...

  7. Environmental guidelines for development of Cultural Resource Management plans. Final report

    SciTech Connect

    1995-08-01

    The purpose of this document is to provide guidelines to the DOE field managements with responsibility for the development of an individual Cultural Resource Management Plan for each DOE facility and program.

  8. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    SciTech Connect

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  9. Wildlife and Wildlife Habitat Mitigation Plan for the Thompson Falls Hydroelectric Project, Final Report.

    SciTech Connect

    Bissell, Gael; Wood, Marilyn

    1985-08-01

    This document presents a preliminary mitigation and enhancement plan for the Thompson Falls hydroelectric project. It discusses options available to provide wildlife protection, mitigation and enhancement in accordance with the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L. 96-501). The options focus on mitigation for wildlife and wildlife habitat losses attributable to the construction of the hydroelectric project. These losses were previously estimated from the best available information concerning the degree of negative and positive impacts to target wildlife species (Wood and Olsen 1984). Criteria by which the mitigation alternatives were evaluated were the same as those used to assess the impacts identified in the Phase I document (Wood and Olsen 1984). They were also evaluated according to feasibility and cost effectiveness. This document specifically focuses on mitigation for target species which were identified during Phase I (Wood and Olsen 1984). It was assumed mitigation and enhancement for the many other target wildlife species impacted by the hydroelectric developments will occur as secondary benefits. The recommended mitigation plan includes two recommended mitigation projects: (1) development of wildlife protection and enhancement plans for MPC lands and (2) strategies to protect several large islands upstream of the Thompson Falls reservoir. If implemented, these projects would provide satisfactory mitigation for wildlife losses associated with the Thompson Falls hydroelectric project. The intent of the mitigation plan is to recommend wildlife management objectives and guidelines. The specific techniques, plans, methods and agreements would be developed is part of the implementation phase.

  10. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    SciTech Connect

    Carr, D.; Hertel, B.; Jewett, M.; Janke, R.; Conner, B.

    1996-02-01

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy`s (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities.

  11. 75 FR 61174 - Warner Valley Comprehensive Site Plan, Final Environmental Impact Statement, Lassen Volcanic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ...-contributing structures and functions. The Final EIS evaluates alternative methods for accomplishing ecological... describes and analyzes a ``no action'' alternative (Alternative 1) which would continue current management.... Alternative 2 (agency preferred) components include: (a) Ecological restoration of Warner Valley fen...

  12. FINAL DISPOSAL OF RADIOACTIVE WASTE IN GERMANY: PLAN APPROVAL PROCESS OF KONRAD MINE AND ACCEPTANCE REQUIREMENTS

    SciTech Connect

    Bandt, Gabriele; Posnatzki, Britta; Beckers, Klaus-Arno

    2003-02-27

    Currently no final repository for any type of radioactive waste is operated in Germany. Preliminary Final Storage Acceptance Requirements for radioactive waste packages were published in 1995. Up to now these are the basis for treatment of radioactive waste in Germany. After licensing of the final repository these preliminary waste acceptance requirements are completed with licensing conditions. Some of these conditions affect the preliminary waste acceptance requirements, e. g. behavior of chemo-toxic substances in case of accidents in the final repository or the allowed maximum concentration of fissile material. The presented examples of radioactive waste conditioning campaigns demonstrate that no difficulties are expected in management, characterization and quality assurance of radioactive wastes due to the licensing conditions.

  13. Wildlife Protection, Mitigation, and Enhancement Plans, Anderson Ranch and Black Canyon Facilities: Final Report.

    SciTech Connect

    Meuleman, G. Allyn

    1987-06-01

    Under direction of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, and the subsequent Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, projects have been developed in Idaho to mitigate the impacts to wildlife habitat and production due to the development and operation of the Anderson Ranch and Black Canyon Facilities (i.e., dam, power plant, and reservoir areas). The Anderson Ranch Facility covered about 4812 acres of wildlife habitat while the Black Canyon Facility covered about 1115 acres. These acreages include dam and power plant staging areas. A separate mitigation plan has been developed for each facility. A modified Habitat Evaluation Procedure (HEP) was used to assess the benefits of the mitigation plans to wildlife. The interagency work group used the target species Habitat Units (HU's) lost at each facility as a guideline during the mitigation planning process, while considering the needs of wildlife in the areas. Totals of 9619 and 2238 target species HU's were estimated to be lost in the Anderson Ranch and Black Canyon Facility areas, respectively. Through a series of projects, the mitigation plans will provide benefits of 9620 target species HU's to replace Anderson Ranch wildlife impacts and benefits of 2195 target species HU's to replace Black Canyon wildlife impacts. Target species to be benefited by the Anderson Ranch and/or Black Canyon mitigation plans include the mallard, Canada goose, mink, yellow warbler, black-capped chickadee, ruffed grouse, mule deer, blue grouse, sharp-tailed grouse, ring-necked pheasant, and peregrine falcon.

  14. Active debris removal: Aspects of trajectories, communication and illumination during final approach

    NASA Astrophysics Data System (ADS)

    Deloo, J. A. F.; Mooij, E.

    2015-12-01

    The aim of this research is to investigate a debris-remediation technique where a chaser performs a rendezvous with the debris, establishes a rigid-link connection, and actively de-orbits the debris. ESA's satellite Envisat has been used as a design case. The research assessed passive safety aspects of the final-approach manoeuvres by analysing the resulting trajectories after thrust inhibit. Next, the research explored the possibility for continuous ground communication by considering the chain of European space tracking (ESTRACK) ground stations (located mainly in Europe). Furthermore, obstruction of the communication signal by the target was studied. Last, the research studies the illumination conditions encountered by the chaser, where obscuration of the Sun by the target was taken into account. Each of these elements are studied for the final approach only. In the topic of passive safety, the results confirm that manoeuvres on H-bar are passively unsafe, and indicate this also for the fly-around manoeuvres along the natural orbital motion. It can be concluded from the communication analysis that the maximum duration of the uninterrupted window varies between 22 and 32 min, using the chain of core ESTRACK ground stations. However, the study on communication blockage shows that frequent communication gaps can occur, with the longest gaps being in the order of one minute in duration. In the field of illumination, it can be concluded that correct target illumination and sensor visibility cannot be guaranteed. Furthermore, the average solar-array area available during final approach varies between 35% and 75%, due to both incorrect pointing of the solar array by the chaser and obscuration by the target.

  15. Dual-bridge inverters: A new approach to bearing currents and conducted EMI. Final report

    SciTech Connect

    1998-04-01

    The purpose of this research report is to present a dual-bridge inverter approach to eliminating the motor common-mode voltage and resulting bearing and leakage currents and conducted electromagnetic interference (EMI). The report reviews first the existing technologies in solving the problems concerning the application of adjustable speed drives. The theoretical analysis is then given for the operation of the novel dual-bridge inverter which is controlled to generate balanced excitation of the induction motor under pulse-width modulation (PWM) operation mode. Finally, simulation and experimental results are presented to verify this concept.

  16. Wildlife Protection, Mitigation, and Enhancement Planning Phase II, Dworshak Reservoir, Final Report.

    SciTech Connect

    Hansen, H. Jerome; Martin, Robert C.

    1989-11-01

    The Pacific Northwest Electric Power Planning and Conservation Act of 1980 directed that measures be implemented to protect, mitigate, and enhance fish and wildlife to the extent affected by development and operation of hydropower projects on the Columbia River System. This Act created the Northwest Power Planning Council, which in turn developed the Columbia River Basin Fish and Wildlife Program. This program established a four-part process: wildlife mitigation status reports; wildlife impact assessments; wildlife protection, mitigation, and enhancement plans; and implementation of protection, mitigation, and enhancement projects. This mitigation plan for the Dworshak Reservoir Hydroelectric Facility was developed to fulfill requirements of Sections 1003(b)(2) and (3) of the Columbia River Basin Fish and Wildlife Program. Specific objectives of wildlife protection, mitigation, and enhancement planning for Dworshak Reservoir included: quantify net impacts to target wildlife species affected by hydroelectric development and operation of Dworshak Dam and Reservoir; develop protection, mitigation, and enhancement goals and objectives for the target wildlife species; recommend protection, mitigation, and enhancement actions for the target wildlife species; and coordination of project activities. 46 refs., 4 figs., 31 tabs.

  17. Analysis of local planning interviews. Final report, September 1983-April 1984

    SciTech Connect

    Wittenberg, C.A.; Parham, P.J.

    1984-04-01

    This report provides the reader with an insight on information collected and applied through the interview process developing state and local Emergency Operations Plans over a seven-year period within FEMA's Region X. The report will show the transition from Nuclear Civil Protection (Crisis Relocation) plans to Integrated Emergency Management plans. The contractor conducted over 200 interviews of private, public, and quasi-public agencies. This document takes the cumulative information from the interviews and categorizes it according to functional areas and by public or provide sector. The interviews documented in the report show the change in emergency management over the past seven years. This change can be attributed to (1) an increased emphasis on all-hazard planning, (2) younger, more aggressive and qualified directors with planning and management backgrounds, (3) the upgrading of the position of Emergency Manager to department status, (4) increased involvement of public safety agencies such as police and fire, (5) better public information and awareness, (6) better training programs and materials through FEMA, and (7) more recruitment and involvement of the private sector and volunteer agencies.

  18. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  19. Preventing landslides on terraced slopes: A methodological approach in planning and constructing new terraces

    NASA Astrophysics Data System (ADS)

    Ažman Momirski, Lucija

    2015-04-01

    In everyday practice, the construction of terraces does not follow a premade plan. Consequently, poorly designed and maintained terraces are often significant sediment sources induced by terrace collapse. The purpose of a plan for terrace construction is to arrange terraces according to geological, geomechanical, geodetic, agricultural, and other data. It is possible to anticipate the consequences of these arrangements through carefully considered decisions (about the ratio of the terrace slope, the quantity and direction of soil shifted when constructing terraces, fitting the terrace geometry to the terrain geometry, the width and length of terrace plains, the inclinations of terrace plains, the construction of field roads and turning points, the construction of drainage for removing groundwater, and other factors). Such a methodological approach in planning and constructing new terraces ensures greater stability of terraces, the smallest quantity of earth shifted, and the greatest possible area of usable land. Building terraces is a direct method for preventing landslides. Building terraces according to a plan increases the efficiency of this method. Such an approach is even more important in areas where terraces extend from the top to bottom of slopes. Two case studies from the Mediterranean area are presented: old terraces from Brkini area, where terraces and their slopes have preserved the same form for almost two hundred years, and the planning process for newly constructed terraced vineyards in the Gorizia Hills with post-project monitoring.

  20. Bioassessment Tools for Stony Corals: Monitoring Approaches and Proposed Sampling Plan for the U.S. Virgin Islands

    EPA Science Inventory

    This document describes three general approaches to the design of a sampling plan for biological monitoring of coral reefs. Status assessment, trend detection and targeted monitoring each require a different approach to site selection and statistical analysis. For status assessm...

  1. Study of the planned N.E. Pacific Street HOV facility. Final report

    SciTech Connect

    Nihan, N.L.

    1992-06-01

    This report presents an analysis of HOV improvements for two signalized arterials in the Seattle metropolitan area. The first involves a planned 1,000 foot queue jumper lane on NE Pacific St. in the University District of Seattle. This planned improvement was studied prior to its implementation in Spring of 1990. As part of this study, an extensive before-data set was developed. The planned improvement in now in place, and an extensive after-study is now in progress as part of a follow-up project. The second study was more of a feasibility analysis of possible HOV improvements for a suburan arterial. Specifically, NE 85/Redmond Way, a 2.5 mile stretch of arterial for Interstate 405 in Kirkland to Willows Road in Redmond, was identified as one of the highest priority arterials to be considered for HOV improvements.

  2. Site inspection health and safety plan. Bennett Army National Guard Facility Bennett, Colorado. Final report

    SciTech Connect

    1995-01-26

    This Health and Safety Plan (HSP) is based on the Remedial Investigation/Feasibility Study (RI/FS) HSP originally developed by R.L. Stollar Associates, Inc. in 1991 for use at the Bennett Army National Guard Facility (BANGF). Subsequent to the initial preparation of the plan, funding to perform the RI/FS at BANGF was not provided. The original RI/FS HSP has been modified to address the potential health and safety hazards associated with conducting a Site Inspection (SI) of this facility. The HSP meets the requirements of Title 29 of the Code of Federal Regulations, Section 1910.120 (29 CFR 1910.120) and 29 CFR 1910.134. Compliance with this HSP for BANGF is required of all field personnel, including subcontractors conducting investigations and waste management identified in the BANGF SI Sampling and Analysis Plan.

  3. Design of a final approach spacing tool for TRACON air traffic control

    NASA Technical Reports Server (NTRS)

    Davis, Thomas J.; Erzberger, Heinz; Bergeron, Hugh

    1989-01-01

    This paper describes an automation tool that assists air traffic controllers in the Terminal Radar Approach Control (TRACON) Facilities in providing safe and efficient sequencing and spacing of arrival traffic. The automation tool, referred to as the Final Approach Spacing Tool (FAST), allows the controller to interactively choose various levels of automation and advisory information ranging from predicted time errors to speed and heading advisories for controlling time error. FAST also uses a timeline to display current scheduling and sequencing information for all aircraft in the TRACON airspace. FAST combines accurate predictive algorithms and state-of-the-art mouse and graphical interface technology to present advisory information to the controller. Furthermore, FAST exchanges various types of traffic information and communicates with automation tools being developed for the Air Route Traffic Control Center. Thus it is part of an integrated traffic management system for arrival traffic at major terminal areas.

  4. Electric utility system planning studies for OTEC power integration. Final report

    SciTech Connect

    1980-11-30

    Florida Power Corporation (FPC) conducted an evaluation of the possible integration of OTEC into the FPC system. Existing system planning procedures, assumptions, and corporate financial criteria for planning new generating capacity were used without modification. A baseline configuration for an OTEC plant was developed for review with standard planning procedures. The OTEC plant characteristics and costs were incorporated in considerable detail. These basic inputs were examined using the FPC system planning methods. It was found that with the initial set of conditions, OTEC would not be economically viable. Using the same system planning procedures, a number of adjustments were made to the key study assumptions. It was found that two considerations dominate the analysis; the assumed rate of fuel cost escalation, and the projected capital cost of the OTEC plant. The analysis produced a parametric curve: on one hand, if fuel costs were to escalate at a rate greater than assumed (12% vs the assumed 5% for coal), and if no change were made to the OTEC input assumptions, the basic economic competitive criteria would be equivalent to the principal alternative, coal fueled plants. Conversely, if the projected cost of the OTEC plant were to be reduced from the assumed $2256/kW to $1450/kW, the economic competitiveness criterion would be satisfied. After corporate financial analysis, it was found that even if the cost competitive criterion were to be reached, the plan including OTEC could not be financed by Florida Power Corporation. Since, under the existing set of conditions for financing new plant capital requirements, FPC could not construct an OTEC plant, some other means of ownership would be necessary to integrate OTEC into the FPC system. An alternative such as a third party owning the plant and selling power to FPC, might prove attractive. (WHK)

  5. Comprehensive Plan for Rehabilitation of Anadromous Fish Stocks in the Umatilla River Basin, 1985 Final Report.

    SciTech Connect

    Boyce, Raymond R.

    1986-01-01

    The goals of the project were to: establish fishery rehabilitation objectives for naturally and hatchery produced salmonids in the Umatilla Basin; estimate potential benefits of each of the rehabilitation and flow enhancement projects to naturally and hatchery produced salmonids; and develop a plan to set priorities, implement, and evaluate projects that will achieve rehabilitation objectives. This document identifies fishery needs, quantifies the contribution of proposed fishery projects under present and enhanced flows, provides cost estimates for projects, and provides a plan for prioritization, implementation, and evaluation of projects.

  6. Kansas DOE/EPSCoR planning and traineeship grants: Final progress report

    SciTech Connect

    1997-05-01

    In 1991, Kansas became the 18th state eligible for EPSCoR support, and it responded quickly to calls for planning proposals from DOE, NSF, and EPA. Planning process was carried out to improve the quality of scientific and engineering R&D in Kansas. All programs attempt to strengthen the intra- and inter-institutional ties to develop a critical mass of researchers in several areas. The following areas of excellence were selected for DOE/EPSCoR traineeships: atomic processes, electric power production, petroleum, high-energy physics, and energy alternative and efficiency.

  7. A knowledge-based approach to improving optimization techniques in system planning

    NASA Technical Reports Server (NTRS)

    Momoh, J. A.; Zhang, Z. Z.

    1990-01-01

    A knowledge-based (KB) approach to improve mathematical programming techniques used in the system planning environment is presented. The KB system assists in selecting appropriate optimization algorithms, objective functions, constraints and parameters. The scheme is implemented by integrating symbolic computation of rules derived from operator and planner's experience and is used for generalized optimization packages. The KB optimization software package is capable of improving the overall planning process which includes correction of given violations. The method was demonstrated on a large scale power system discussed in the paper.

  8. Methodical Approach to Developing a Decision Support System for Well Interventions Planning

    NASA Astrophysics Data System (ADS)

    Silich, V. A.; Savelev, A. O.; Isaev, A. N.

    2016-04-01

    The paper contains aspects of developing a decision support systems aimed for well interventions planning within the process of oil production engineering. The specific approach described by authors is based on system analysis methods and object model for system design. Declared number of problem-decision principles as follows: the principle of consolidated information area, the principle of integrated control, the principle of development process transparency. Also observed a set of models (class model, object model, attribute interdependence model, component model, coordination model) specified for designing decision support system for well intervention planning.

  9. A Simulation Based Approach for Contingency Planning for Aircraft Turnaround Operation System Activities in Airline Hubs

    NASA Technical Reports Server (NTRS)

    Adeleye, Sanya; Chung, Christopher

    2006-01-01

    Commercial aircraft undergo a significant number of maintenance and logistical activities during the turnaround operation at the departure gate. By analyzing the sequencing of these activities, more effective turnaround contingency plans may be developed for logistical and maintenance disruptions. Turnaround contingency plans are particularly important as any kind of delay in a hub based system may cascade into further delays with subsequent connections. The contingency sequencing of the maintenance and logistical turnaround activities were analyzed using a combined network and computer simulation modeling approach. Experimental analysis of both current and alternative policies provides a framework to aid in more effective tactical decision making.

  10. MARSSIM vs. DOE Order 5400.5: the Final Status Survey plan at the Rocky Flats Environmental Technology Site.

    PubMed

    Roberts, Sarah J; Stevens, Jeff

    2003-06-01

    A challenge unique to the decommissioning of Department of Energy (DOE) facilities involves the compromise between the existing and newly recommended standards for the unrestricted release of property and materials. The Rocky Flats Environmental Technology Site (RFETS) is currently decommissioning numerous plutonium contaminated facilities. The default DOE standard for unrestricted release, Order 5400.5, defines surface activity guidelines as averaged over a 1-square-meter area with a maximum value defined for any given 100-square-centimeter area. While the Order was initially developed to release property and materials from an operating site, it is restrictive in its use when performing Final Status Survey and, to date, no new complex wide standard has been developed. However, the RFETS stakeholders selected the MARSSIM, which provides a progressive method to demonstrate compliance with the defined "dose-based" limits for a specific site, as the governing document in developing a final survey method. The end result is a hybrid final status survey plan that incorporates the requirements of both documents. This plan represents several years of development and negotiation between the contractor, the DOE, the Colorado Department of Public Health and Environment, the Rocky Flats stakeholders, and other interested parties. PMID:12792399

  11. Strategic planning for aircraft noise route impact analysis: A three dimensional approach

    NASA Technical Reports Server (NTRS)

    Bragdon, C. R.; Rowan, M. J.; Ahuja, K. K.

    1993-01-01

    The strategic routing of aircraft through navigable and controlled airspace to minimize adverse noise impact over sensitive areas is critical in the proper management and planning of the U.S. based airport system. A major objective of this phase of research is to identify, inventory, characterize, and analyze the various environmental, land planning, and regulatory data bases, along with potential three dimensional software and hardware systems that can be potentially applied for an impact assessment of any existing or planned air route. There are eight data bases that have to be assembled and developed in order to develop three dimensional aircraft route impact methodology. These data bases which cover geographical information systems, sound metrics, land use, airspace operational control measures, federal regulations and advisories, census data, and environmental attributes have been examined and aggregated. A three dimensional format is necessary for planning, analyzing space and possible noise impact, and formulating potential resolutions. The need to develop this three dimensional approach is essential due to the finite capacity of airspace for managing and planning a route system, including airport facilities. It appears that these data bases can be integrated effectively into a strategic aircraft noise routing system which should be developed as soon as possible, as part of a proactive plan applied to our FAA controlled navigable airspace for the United States.

  12. Ecology of Greater Sage-Grouse in the Bi-State Planning Area Final Report, September 2007

    USGS Publications Warehouse

    Casazza, Michael L.; Overton, Cory T.; Farinha, Melissa A.; Torregrosa, Alicia; Fleskes, Joseph P.; Miller, Michael R.; Sedinger, James S.; Kolada, Eric

    2009-01-01

    completed in 2004 and 2005 addressed each of the specific objectives and this final report focuses on the biological information gathered in support of local conservation efforts. Participation in the development of the Bi-State Local Area Conservation Plan was accomplished on multiple scales. Beginning in the fall of 2002, USGS personnel began participating in meetings of local stakeholders involved in the development of a sage-grouse conservation plan for the Bi-State planning area. This included attendance at numerous local PMU group meetings and field trips as well as participating on the technical advisory committee (TAC) for the Bi-State group. Whenever appropriate, ongoing results and findings regarding sage-grouse ecology in the local area were incorporated into these working group meetings. In addition, the USGS partnered with CDFG to help reorganize one of the local PMU groups (South Mono) and edited that portion of the Bi-State plan. The USGS also worked closely with CDFG to draft a description of the state of knowledge for sage-grouse genetic information for inclusion in the Bi-State Conservation Plan. The first edition of the Bi-State Conservation Plan for Greater Sage-Grouse was completed in June 2004 (Bi-State Sage-grouse Conservation Team 2004). This report is organized primarily by PMU to facilitate the incorporation of these research findings into the individual PMU plans that compose the Bi-State plan. Information presented in this report was derived from over 7,000 radio-telemetry locations obtained on 145 individual sage-grouse during a three year period (2003-2005). In addition, we collected detailed vegetation measurements at over 590 habitat sampling plots within the study area including canopy cover, shrubs, forbs, and grasses diversity. Vegetation data collection focused on sage-grouse nests, and brood-use areas. Additionally we collected data at random sites to examine sage-grouse habitat relationships within the study area. The majori

  13. A Descriptive Case Study of Appreciative Inquiry as an Approach to Strategic Planning for Special Education in a Public School

    ERIC Educational Resources Information Center

    Ruhlman, Paul L., Jr.

    2014-01-01

    This study's purpose was to describe appreciative inquiry (AI) as an approach to strategic planning for special education in a public school. The study investigated four research questions. How do plans for special education emerge as participants engage in the four phases of AI during strategic planning for the future of special education in a…

  14. Evaluating R and D options under uncertainty. Volume 3. An electric-utility generation-expansion planning model. Final report

    SciTech Connect

    Borison, A.B.; Judd, B.R.; Morris, P.A.; Walters, E.C.

    1981-08-01

    This report describes an electric utility generation expansion model developed for use in research and development (R and D) planning under uncertainty. The model provides a framework for examining broad utility and R and D planning issues, rather than the specific generation expansion decisions of individual utilities. Unlike existing approaches, the model focuses directly on the demand, technological, and regulatory uncertainties and the long-term dynamics that affect the impact of R and D achievements. The model's somewhat aggregate approach to electric utility decision-making (to allow repeated application at low cost) can be modified, as needed, for more detailed utility planning. When fully implemented, the model can be applied to the analysis of issues such as technology adoption, reserve margin, unit size, reliability, storage and load management effects, lead time, and government regulation. The model inputs include demand, supply (generation technology characteristics), and external factors (regulatory constraints). The outputs are the optimal (minimum discounted expected cost) generation expansion plan, its cost, and other aspects of this plan. The model relies on three mathematical programming approaches: dynamic programming, iterative dynamic programming, and state-of-the-world decomposition. The state-of-the-world decomposition component separates the main problem into a set of individual scenario problems, each of which is solved with the iterative dynamic-programming component. The iterative dynamic-programming component, in turn, transforms each individual scenario problem into a series of even simpler problems, each of which is solved with the dynamic-programming component. Possible future extensions of the model involve increased operating detail, increased financial detail, explicit incorporation of storage and load management options, and more efficient treatment of closed-loop decision-making.

  15. A Model Plan for a Career Education Curriculum Laboratory. Final Report.

    ERIC Educational Resources Information Center

    Koenig, John H.

    To develop a model plan for a career education curriculum laboratory, a 2-phase study was conducted with phase one concentrating upon the state-of-the-art of curriculum development in Vocational Education Curriculum Laboratories and the production, nationally, of vocational instructional materials, and phase two starting with the study of the…

  16. An Evaluation of the Plan To Revise Special Education in New Jersey. Final Report.

    ERIC Educational Resources Information Center

    Joy, Myra F.; And Others

    In response to the recommendations of the New Jersey Special Education Study Commission and input from parents, educators, and the general public, the New Jersey Department of Education's Division of Special Education developed "A Plan To Revise Special Education in New Jersey" (1986), commonly called P2R. P2R calls for changes in the focus and…

  17. A Marketing and Distributive Education Curriculum Development Plan with Student Learning Objectives. Final Report.

    ERIC Educational Resources Information Center

    Wilson, Blaine R.

    This project was conducted to design marketing and distributive education (MDE) student learning objectives and an MDE curriculum development plan. The objectives of this project were met through the following procedures: (1) basic MDE task research was identified; (2) a task force of two MDE teacher coordinators and the project director grouped…

  18. 78 FR 4430 - Chassahowitzka National Wildlife Refuge, FL; Final Comprehensive Conservation Plan and Finding of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... 8, 2009 (74 FR 27173). For more about the refuge and our planning process, please see that notice... May 11, 2012 (77 FR 27792). We provided over 125 copies of the Draft CCP/EA to individuals or... refuge's diverse ecosystems, including prime estuarine habitat, hosts a myriad and abundance of flora...

  19. Final Pantex Report - 2006 [Phase 1 plan for assessment of Former Workers at the Pantex Facility

    SciTech Connect

    Abdo, Ronna

    2013-07-18

    The purpose of this project was to develop a Phase 1 plan for assessment of Former Workers at the Pantex Facility in Amarillo, TX and to determine the suitability to start a medical surveillance program among former workers for this site.

  20. Model Plan for Administration and Supervision Services. (Student Vocational Organization Coordinator.) Final Report.

    ERIC Educational Resources Information Center

    Wonser, Renee; Kohns, Donald

    Growing out of a project to improve administrative and support services for North Dakota student vocational organizations, this manual outlines possible duties and responsibilities of a state-level student vocational organizational coordinator based on a sequential planning and implementation system. The manual is divided into four areas with…

  1. 77 FR 32022 - Direct Final Negative Declaration and Withdrawal of Large Municipal Waste Combustors State Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ..., were originally established by EPA on December 15, 1995 (60 FR 65415). EPA approved Illinois' LMWC State Plan to implement EPA's emission guidelines for existing LMWCs on December 29,1997 at 62 FR 67570... 12866 (58 FR 51735, October 4, 1993), this action is not a ``significant regulatory action''...

  2. 75 FR 15457 - Notice of Availability of Final Elk Management Plan and Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... National Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces... through the NPS Planning, Environment, and Public Comment Web site ( http://parkplanning.nps.gov/THRO... within management goals is no longer an option because of a an NPS policy issued in 2002...

  3. The 1993 Parent Meetings for Planning the Saint Paul/Ramsey County Children's Initiative. Final Report.

    ERIC Educational Resources Information Center

    Sandell, Elizabeth J., Ed.

    This report describes the initial plan, participants, and evaluation of Saint Paul (Minnesota) Children's Initiative (SPCI) during 1993. The SPCI is a family-community program to improve child health, child development, school performance, and to enhance family functioning through formal and informal support systems in Saint Paul/Ramsey county. At…

  4. 78 FR 49762 - Desecheo National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... in the Federal Register on December 19, 2008 (73 FR 77828). For more about the refuge and planning... July 11, 2012 (77 FR 40893). We provided copies of the Draft CCP/EA to a number of individuals, non..., if necessary, efforts to remove invasive species. The number of vegetation plots and frequency...

  5. 76 FR 43143 - Approval and Promulgation of Air Quality Implementation Plan; Kansas; Final Disapproval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... Disapproval of Interstate Transport State Implementation Plan Revision for the 2006 24-hour PM2.5 NAAQS AGENCY.... Background On March 18, 2011 (76 FR 14831-14835), EPA proposed to disapprove a portion of the...) regarding EPA's March 18, 2011 proposed disapproval (76 FR 14831). The commenters submitted...

  6. A College Marketing Plan That's Working: Final Report. CASE Certification Program in Executive Management.

    ERIC Educational Resources Information Center

    Noll, Gayle

    In response to a 3% decline in fall 1977 enrollments, Odessa College developed and implemented a comprehensive marketing program. After initial planning, a marketing task force and nine mini-task forces were created to deal with the topics of community economic markets, community cultural markets, student retention, student recruitment techniques,…

  7. EVALUATION CONFERENCE ON LEADERSHIP DEVELOPMENT SEMINARS, PROGRAM PLANNING, BUDGETING AND EVALUATION. FINAL REPORT.

    ERIC Educational Resources Information Center

    HIMMELE, IRVIN H.; SMITH, CLODUS R.

    THIRTY-FOUR PARTICIPANTS REPRESENTING THE LEADERSHIP-ACTION LEVEL OF PERSONNEL THROUGHOUT THE NATION AND FROM THE U.S. OFFICE OF EDUCATION EVALUATED THE LEADERSHIP DEVELOPMENT AND PROGRAM PLANNING, AND BUDGETING SEMINARS HELD DURING 1967. GUIDELINES FOR SEMINAR EVALUATION WERE PRESENTED--(1) "RATIONALE AND RETROSPECT" BY N. EDWIN CRAWFORD, (2)…

  8. Individualized Surgical Approach Planning for Petroclival Tumors Using a 3D Printer.

    PubMed

    Muelleman, Thomas John; Peterson, Jeremy; Chowdhury, Naweed Iffat; Gorup, Jason; Camarata, Paul; Lin, James

    2016-06-01

    Objectives To determine the utility of three-dimensional (3D) printed models in individualized petroclival tumor resection planning by measuring the fidelity of printed anatomical structures and comparing tumor exposure afforded by different approaches. Design Case series and review of the literature. Setting Tertiary care center. Participants Three patients with petroclival lesions. Main Outcome Measures Subjective opinion of access by neuro-otologists and neurosurgeons as well as surface area of tumor exposure. Results Surgeons found the 3D models of each patient's skull and tumor useful for preoperative planning. Limitations of individual surgical approaches not identified through preoperative imaging were apparent after 3D models were evaluated. Significant variability in exposure was noted between models for similar or identical approaches. A notable drawback is that our printing process did not replicate mastoid air cells. Conclusions We found that 3D modeling is useful for individualized preoperative planning for approaching petroclival tumors. Our printing techniques did produce authentic replicas of the tumors in relation to bony structures. PMID:27175320

  9. Final work plan : investigation of potential contamination at the former USDA facility in Ramona, Kansas.

    SciTech Connect

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work that will be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Ramona, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential source areas on the property, (2) determine the vertical and horizontal extent of potential contamination, and (3) provide recommendations for future actions, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the United States Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy. Under the Intergovernmental Agreement, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. The Master Work Plan was approved by the KDHE. It contains materials common to investigations at locations in Kansas and should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Ramona.

  10. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    SciTech Connect

    Not Available

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  11. An Ecological Approach to Seeking and Utilising the Views of Young People with Intellectual Disabilities in Transition Planning

    ERIC Educational Resources Information Center

    Small, Neil; Raghavan, Raghu; Pawson, Nicole

    2013-01-01

    Transition planning using a person-centred approach has, in the main, failed to shape service provision. We offer an alternative based on an ecological understanding of human development linked to public health approaches that prioritise whole system planning. A total of 43 young people with intellectual disabilities, in Bradford, England, who…

  12. 77 FR 20840 - Bogue Chitto National Wildlife Refuge, LA and MS; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... in the Federal Register on February 20, 2009 (74 FR 7913). Please see that notice for more about the... Federal Register notice on May 27, 2011 (76 FR 30959). A news release was sent out to four local, State..., Louisiana, and Pearl River County, Mississippi. In the final CCP, we describe how we will manage this...

  13. 75 FR 49514 - Notice of Availability for the Little Snake Proposed Resource Management Plan and Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... EIS. The Proposed RMP/Final EIS addresses many issues important to the area, including energy..., or other personal identifying information in your protest, you should be aware that your entire protest--including your personal identifying information--may be made publicly available at any...

  14. 78 FR 68858 - Seal Beach National Wildlife Refuge, Orange County, CA; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ..., updates to constituents, and a Federal Register notice (76 FR 16634; March 24, 2011). The draft CCP/EA... Fish and Wildlife Service Seal Beach National Wildlife Refuge, Orange County, CA; Final Comprehensive...) for the Seal Beach National Wildlife Refuge (Refuge). In the CCP, we describe how we will manage...

  15. 78 FR 16286 - Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... Federal Register (73 FR 76677) on December 17, 2008. For more about the initial process and the history of... comments in a notice of availability (77 FR 50155) on August 20, 2012. The 30-day comment period ended on... Fish and Wildlife Service Neal Smith National Wildlife Refuge, Jasper County, IA; Final...

  16. Technology in Early Childhood: Planning and Learning about Community Environments (TEChPLACEs). Final Report.

    ERIC Educational Resources Information Center

    Hutinger, Patricia; Clark, Letha; Johanson, Joyce

    This final report discusses the outcomes of a 2-year project designed to provide an innovative tool process and a state-of-the-art instructional environment for children from 3 through 8 years of age with a wide range of disabilities across ages, classrooms, and locations as they constructed their own communities and participated in building a…

  17. 76 FR 29259 - Swan Lake National Wildlife Refuge, Chariton County, MO; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... notice of availability (75 FR 30422) on June 1, 2010. Swan Lake NWR was established in 1937 by Executive... notice of intent on (71 FR 20722, April 21, 2006). For more information about the initial process, see... Fish and Wildlife Service Swan Lake National Wildlife Refuge, Chariton County, MO; Final...

  18. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric Administration (NOAA), Department of Commerce (DOC). ACTION: Notice of public availability. SUMMARY: NOAA is releasing the final... 23606; (757) 591-7328; or via email at Monitor@noaa.gov . Copies can also be downloaded from the...

  19. 77 FR 75644 - Malheur National Wildlife Refuge, Harney County, OR; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... final CCP/EIS for the Refuge. We started this process through a notice in the Federal Register (74 FR... notice of availability in the Federal Register (77 FR 13141, March 5, 2012). The Refuge was established... solicited comments on the Draft CCP/EIS from March 5 to May 4, 2012 (77 FR 13139, March 5, 2012)....

  20. 76 FR 18870 - Approval and Promulgation of Implementation Plans: Alabama: Final Disapproval of Revisions to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-06

    ...-8363). By its plain language, section 110(l) applies to every SIP revision submitted by a state. In..., 2008, final rule (73 FR 60957) approving revisions to the Alabama SIP embodied in two submittals dated... the SIP revisions. The third was an October 2, 2009, proposed rule (74 FR 50930) identifying...

  1. CAD/CAM Fabrication of Definitive Implant Prostheses: A Digital Workflow From Planning to Implant Placement to Final Restoration.

    PubMed

    Baumgarten, Harold S; Wunsche, Alexander

    2015-01-01

    Traditional methods of performing dental implant surgery and fabricating a definitive implant-supported prosthesis are being supplanted by digital techniques that provide greater precision and a more durable and esthetic restoration. In the present case, a 68-year-old woman presented a severely compromised dentition. She had received extensive restorative dentistry in the past and, due to recurrent caries and chronic periodontitis, was facing the loss of her maxillary teeth, as well as teeth in the lower left quadrant. This case report illustrates the use of a number of digital techniques for both treatment planning and fabrication of the final restoration. PMID:26625167

  2. CONSIDERATIONS FOR DEVELOPING A DOSIMETRY-BASED CUMULATIVE RISK ASSESSMENT APPROACH FOR MIXTURES OF ENVIRONMENTAL CONTAMINANTS (Final Report)

    EPA Science Inventory

    This final report, Considerations for Developing a Dosimetry-Based Cumulative Risk Assessment Approach for Mixtures of Environmental Contaminants, addresses the justification for developing physiologically based pharmacokinetic (PBPK) models for cumulative risk assessment....

  3. National Aeronautics and Space Administration FY 02 Revised Final Annual Performance Plan

    NASA Astrophysics Data System (ADS)

    2002-01-01

    The Government Performance and Results Act (GPRA) was passed by Congress and signed by the President in 1993. GPRA was enacted to improve the efficiency of all Federal agencies, with the following specific goals: (1) Improve Federal program management, effectiveness, and public accountability; (2) Improve Congressional decision making on where to commit the Nation's financial and human resources; and (3) Improve citizen confidence in government performance. GPRA directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The Act directs agencies to manage and measure results to justify Congressional appropriations and authorizations. The Report Consolidation Act of 2000 directs agencies to provide a report on the degree of success in achieving the goals and performance measures defined in the strategic and performance plans one hundred and fifty days after the completion of the fiscal year.

  4. A sampling plan for riparian birds of the Lower Colorado River-Final Report

    USGS Publications Warehouse

    Bart, Jonathan; Dunn, Leah; Leist, Amy

    2010-01-01

    A sampling plan was designed for the Bureau of Reclamation for selected riparian birds occurring along the Colorado River from Lake Mead to the southerly International Boundary with Mexico. The goals of the sampling plan were to estimate long-term trends in abundance and investigate habitat relationships especially in new habitat being created by the Bureau of Reclamation. The initial objective was to design a plan for the Gila Woodpecker (Melanerpes uropygialis), Arizona Bell's Vireo (Vireo bellii arizonae), Sonoran Yellow Warbler (Dendroica petechia sonorana), Summer Tanager (Piranga rubra), Gilded Flicker (Colaptes chrysoides), and Vermilion Flycatcher (Pyrocephalus rubinus); however, too little data were obtained for the last two species. Recommendations were therefore based on results for the first four species. The study area was partitioned into plots of 7 to 23 hectares. Plot borders were drawn to place the best habitat for the focal species in the smallest number of plots so that survey efforts could be concentrated on these habitats. Double sampling was used in the survey. In this design, a large sample of plots is surveyed a single time, yielding estimates of unknown accuracy, and a subsample is surveyed intensively to obtain accurate estimates. The subsample is used to estimate detection ratios, which are then applied to the results from the extensive survey to obtain unbiased estimates of density and population size. These estimates are then used to estimate long-term trends in abundance. Four sampling plans for selecting plots were evaluated based on a simulation using data from the Breeding Bird Survey. The design with the highest power involved selecting new plots every year. Power with 80 plots surveyed per year was more than 80 percent for three of the four species. Results from the surveys were used to provide recommendations to the Bureau of Reclamation for their surveys of new habitat being created in the study area.

  5. Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.

    SciTech Connect

    Bissell, Gael

    1985-01-01

    This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.

  6. Wildlife and Wildlife Habitat Mitigation Plan for Libby Hydroelectric Project, Final Report.

    SciTech Connect

    Mundinger, John

    1985-01-01

    This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Libby hydroelectric project. Mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. The report describes mitigation that has already taken place and 8 recommended mitigation projects designed to complete total wildlife mitigation. 8 refs., 2 figs., 12 tabs.

  7. LDRD final report: Automated planning and programming of assembly of fully 3D mechanisms

    SciTech Connect

    Kaufman, S.G.; Wilson, R.H.; Jones, R.E.; Calton, T.L.; Ames, A.L.

    1996-11-01

    This report describes the results of assembly planning research under the LDRD. The assembly planning problem is that of finding a sequence of assembly operations, starting from individual parts, that will result in complete assembly of a device specified as a CAD model. The automated assembly programming problem is that of automatically producing a robot program that will carry out a given assembly sequence. Given solutions to both of these problems, it is possible to automatically program a robot to assemble a mechanical device given as a CAD data file. This report describes the current state of our solutions to both of these problems, and a software system called Archimedes 2 we have constructed to automate these solutions. Because Archimedes 2 can input CAD data in several standard formats, we have been able to test it on a number of industrial assembly models more complex than any before attempted by automated assembly planning systems, some having over 100 parts. A complete path from a CAD model to an automatically generated robot program for assembling the device represented by the CAD model has also been demonstrated.

  8. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    SciTech Connect

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  9. Basewide energy systems plan, Fort Gordon, Georgia. Executive summary. Final report

    SciTech Connect

    1983-01-01

    This is a summary of the results for Increments A, B, C, D, and E of the Basewide Energy Systems Plan for Fort Gordon, Georgia. (The results for Increments F and G are summarized on pages 5 through 7.) The plan includes analyses and recommendations of energy conservation projects for reduction of the installation`s present energy consumption. The installation should be aware that savings figures presented in this summary can only be realized after all projects have been implemented. Black and Veatch has developed projects that would meet the funding requirements for the energy conservation program. Furthermore, the recommended projects provide partial compliance with the energy conservation requirements for the installation as outlined in the Army Facilities Energy Plan. This summary presents data on the following: Existing energy consumption, source energy reductions due to energy conservation techniques for buildings and their systems, application of solar energy to reduce fossil fuel consumption, savings utilizing central energy monitoring and control systems (EMCS), use of solid waste as an alternate energy source, analysis of Total Energy/Selective Energy (TE/SE) systems.

  10. A Dynamic Path Planning Approach for Multirobot Sensor-Based Coverage Considering Energy Constraints.

    PubMed

    Yazici, Ahmet; Kirlik, Gokhan; Parlaktuna, Osman; Sipahioglu, Aydin

    2014-03-01

    Multirobot sensor-based coverage path planning determines a tour for each robot in a team such that every point in a given workspace is covered by at least one robot using its sensors. In sensor-based coverage of narrow spaces, i.e., obstacles lie within the sensor range, a generalized Voronoi diagram (GVD)-based graph can be used to model the environment. A complete sensor-based coverage path plan for the robot team can be obtained by using the capacitated arc routing problem solution methods on the GVD-based graph. Unlike capacitated arc routing problem, sensor-based coverage problem requires to consider two types of edge demands. Therefore, modified Ulusoy algorithm is used to obtain mobile robot tours by taking into account two different energy consumption cases during sensor-based coverage. However, due to the partially unknown nature of the environment, the robots may encounter obstacles on their tours. This requires a replanning process that considers the remaining energy capacities and the current positions of the robots. In this paper, the modified Ulusoy algorithm is extended to incorporate this dynamic planning problem. A dynamic path-planning approach is proposed for multirobot sensor-based coverage of narrow environments by considering the energy capacities of the mobile robots. The approach is tested in a laboratory environment using Pioneer 3-DX mobile robots. Simulations are also conducted for a larger test environment. PMID:23757551

  11. Renewable energy in electric utility capacity planning: a decomposition approach with application to a Mexican utility

    SciTech Connect

    Staschus, K.

    1985-01-01

    In this dissertation, efficient algorithms for electric-utility capacity expansion planning with renewable energy are developed. The algorithms include a deterministic phase that quickly finds a near-optimal expansion plan using derating and a linearized approximation to the time-dependent availability of nondispatchable energy sources. A probabilistic second phase needs comparatively few computer-time consuming probabilistic simulation iterations to modify this solution towards the optimal expansion plan. For the deterministic first phase, two algorithms, based on a Lagrangian Dual decomposition and a Generalized Benders Decomposition, are developed. The probabilistic second phase uses a Generalized Benders Decomposition approach. Extensive computational tests of the algorithms are reported. Among the deterministic algorithms, the one based on Lagrangian Duality proves fastest. The two-phase approach is shown to save up to 80% in computing time as compared to a purely probabilistic algorithm. The algorithms are applied to determine the optimal expansion plan for the Tijuana-Mexicali subsystem of the Mexican electric utility system. A strong recommendation to push conservation programs in the desert city of Mexicali results from this implementation.

  12. Comment and response document on the final remedial action plan and site design for stabilization of the inactive Uranium Mill Tailings Site at Lakeview, Oregon

    SciTech Connect

    Not Available

    1991-10-01

    This report contains comments provided by the Oregon Department of Energy and responses to these comments on the final remedial action plan for the inactive uranium mill tailings site at Lakeview, Oregon.

  13. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. OVERVIEW AND APPLICATION. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  14. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 4: ANALYTICAL GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  15. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS, MODULE 3: SITE CHARACTERIZATION AND SAMPLING GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  16. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    NASA Astrophysics Data System (ADS)

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  17. Trail inventory and assessment approaches to trail system planning at Delaware Water Gap National Recreation Area

    USGS Publications Warehouse

    Williams, P.B.; Marion, J.L.

    1993-01-01

    Trail system planning and management require accurate assessments of existing trail resources and their condition. A standardized and efficient process for surveying, inventorying, and assessing trail systems was developed and applied in the Delaware Water Gap National Recreation Area. Two approaches employed were (1) a Trail System Inventory, and (2) Prescriptive Work Logs. These complimentary approaches provide resource managers with valuable information regarding the location and length of individual trails, their current condition and needed maintenance work, and material and labor estimates necessary to conduct such work.

  18. Approach to computer-based medication planning and coordination support in intensive care units.

    PubMed

    Thull, B; Janssens, U; Rau, G; Hanrath, P

    1997-07-01

    Due to more and more complex diagnosis and therapy measures, the critical care of patients requires an extensive work organisation which comprises patient, doctors, nurses and external services (e.g., central laboratory). In this organisation, the documentation plays a major role for the planning and coordination of work procedures and information flow within the medical staff. Various studies in intensive care units (ICU) reveal that the complex work organisation and the related information flow are faulty. Breakdowns are often caused by a lack of coordination between doctors and nurses and by poor transparency of work procedures. A typical example is the incorrect application of a doctor's medication orders by a nurse because she might have overseen a plan modification. This intransparency increases the strain on the medical staff and might result in critical effects on the patient. One approach to design a computer support for medication planning as well as the coordination when executing medication plans is given by work flow models. This paper shows that work flow models could be used to improve deficiencies in medication planning and coordination. Furthermore, it is demonstrated how such a support can be mediated to the user through an appropriately designed user interface. PMID:9263371

  19. Stakeholder perceptions of a total market approach to family planning in Viet Nam.

    PubMed

    Drake, Jennifer Kidwell; Thi Thanh, Luu Huong; Suraratdecha, Chutima; Thi Thu, Ha Phan; Vail, Janet G

    2010-11-01

    Viet Nam has high modern contraceptive prevalence (68%), with most services received through the public sector. As the country transitions to middle-income status, Viet Nam's donors have ceased donations of contraceptive supplies, causing a large projected shortfall in the family planning budget. In response, the Ministry of Health has decided to prioritize free or subsidized contraceptives for poor and vulnerable groups, while enhancing social marketing and sales of contraceptives in the free market. To support planning for this "total market approach", a descriptive exploratory study was conducted with 38 public and private sector family planning stakeholders to gain their perceptions of the proposals. There was a high level of support for government leadership of public-private coordination and stewardship of the entire family planning system. Key information gaps were identified regarding how the reforms can promote equitable access to family planning and financial sustainability in pricing. The government's experience with this transition may yield valuable guidance for other settings. PMID:21111350

  20. Fuel cell power systems for remote applications. Phase 1 final report and business plan

    SciTech Connect

    1998-02-01

    The goal of the Fuel Cell Power Systems for Remote Applications project is to commercialize a 0.1--5 kW integrated fuel cell power system (FCPS). The project targets high value niche markets, including natural gas and oil pipelines, off-grid homes, yachts, telecommunication stations and recreational vehicles. Phase 1 includes the market research, technical and financial analysis of the fuel cell power system, technical and financial requirements to establish manufacturing capability, the business plan, and teaming arrangements. Phase 1 also includes project planning, scope of work, and budgets for Phases 2--4. The project is a cooperative effort of Teledyne Brown Engineering--Energy Systems, Schatz Energy Research Center, Hydrogen Burner Technology, and the City of Palm Desert. Phases 2 through 4 are designed to utilize the results of Phase 1, to further the commercial potential of the fuel cell power system. Phase 2 focuses on research and development of the reformer and fuel cell and is divided into three related, but potentially separate tasks. Budgets and timelines for Phase 2 can be found in section 4 of this report. Phase 2 includes: Task A--Develop a reformate tolerant fuel cell stack and 5 kW reformer; Task B--Assemble and deliver a fuel cell that operates on pure hydrogen to the University of Alaska or another site in Alaska; Task C--Provide support and training to the University of Alaska in the setting up and operating a fuel cell test lab. The Phase 1 research examined the market for power systems for off-grid homes, yachts, telecommunication stations and recreational vehicles. Also included in this report are summaries of the previously conducted market reports that examined power needs for remote locations along natural gas and oil pipelines. A list of highlights from the research can be found in the executive summary of the business plan.

  1. Quality assurance project plan for the UMTRA technical assistance contractor hydrochemistry facility. Final report

    SciTech Connect

    1993-07-01

    The Uranium Mill Tailings Remedial Action (UMTRA) hydrochemistry facility is used to perform a limited but important set of services for the UMTRA Project. Routine services include support of field-based hydrological and geochemical operations and water sampling activities. Less commonly, the hydrology and geochemistry staff undertake special studies and site characterization studies at this facility. It is also used to train hydrologists, geochemists, and groundwater sampling crews. A review of this Quality Assurance Project Plan (QAPP) shall be accomplished once each calendar year. This review will be targeted to be accomplished not sooner than 6 months and not later than 18 months after the last review.

  2. Texas geothermal R D and D program planning support document. Final report

    SciTech Connect

    Davis, R.J.; Conover, M.F.; Keeney, R.C.; Personett, M.L.; Richmann, D.L.

    1981-08-28

    Program planning support was provided by; developing a geothermal RD and D program structure, characterizing the status of geothermal RD and D through review of literature and interaction with the geothermal research community, developing a candidate list of future Texas geothermal projects, and prioritizing the candidate projects based on appropriate evaluation criteria. The method used to perform this study and the results thereof are presented. Summary reviews of selected completed and ongoing projects and summary descriptions and evaluations of the candidate RD and D projects ar provided. A brief discussion emerging federal RD and D policies is presented. References and independent project rankings by three of the GRP members are included. (MHR)

  3. Comment and response document for the final remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Revision 2

    SciTech Connect

    1996-05-01

    This document for the final remedial action plan and site design has been prepared for US Department of Energy Environmental Restoration Division as part of the Uranium Mill Tailings Remedial Action plan. Comments and responses are included for the site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado.

  4. Long-Range Strategic Planning for Libraries & Information Resources in the Research University. The Final Report on a Research Program on the Future of the Academic Research Library.

    ERIC Educational Resources Information Center

    California Univ., Los Angeles. Graduate School of Library and Information Science.

    This final report on a project at the University of California at Los Angeles (UCLA) on strategic planning for libraries and information resources in the research university begins with an introductory section on levels of consideration in planning; issues of current concern (effects of technology, economics of libraries, changes in the academic…

  5. UMTRA Project Office Federal Employee Occupational Safety and Health Program Plan. Final draft

    SciTech Connect

    Young, B.H.

    1994-02-01

    This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with the applicable requirements of DOE Order 3790.1 B and DOE Albuquerque Operations Office (AL) Order 3790.1A. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES&H) Plan (DOE, 1992), which establishes the basic programmatic ES&H requirements for all participants on the UMTRA Project. The ES&H plan is designed primarily to cover remedial action activities at UMTRA sites, and defines the ES&H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES&H program and covers only the federal employees working on the UMTRA Project.

  6. Wildlife Protection, Mitigation and Enhancement Planning for Grand Coulee Dam, Final Report.

    SciTech Connect

    Creveling, Jennifer

    1986-08-01

    The development and operation of Grand Coulee Dam inundated approximately 70,000 acres of wildlife habitat under the jurisdictions of the Colville Confederated Tribes, the Spokane Tribe, and the State of Washington. Under the provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, this study reviews losses to wildlife and habitat, and proposes mitigation for those losses. Wildlife loss estimates were developed from information available in the literature. Habitat losses and potential habitat gains through mitigation were estimated by a modified Habitat Evaluation Procedure. The mitigation plan proposes (1) acquisition of sufficient land or management rights to land to protect Habitat Units equivalent to those lost (approximately 73,000 acres of land would be required), (2) improvement and management of those lands to obtain and perpetuate target Habitat Units, and (3) protection and enhancement of suitable habitat for bald eagles. Mitigation is presented as four actions to be implemented over a 10-year period. A monitoring program is proposed to monitor mitigation success in terms of Habitat Units and wildlife population trends.

  7. Albeni Falls Wildlife Protection, Mitigation, and Enhancement Plan, Final Report 1987.

    SciTech Connect

    Martin, Robert C.

    1988-08-01

    A wildlife impact assessment and mitigation plan has been developed for the US Army Corps of Engineers Albeni Falls Project in northern Idaho. The Habitat Evaluation Procedure (HEP) was used to evaluate pre- and post-construction habitat conditions at the Albeni Falls Project. There were 6617 acres of wetlands converted to open water due to development and operation of the project. Eight evaluation species were selected with impacts expressed in numbers of Habitat Units (HU's). For a given species, one HU is equivalent to one acre of prime habitat. The Albeni Falls Project resulted in estimated losses of 5985 mallard HU's, 4699 Canada goose HU's, 3379 redhead HU's, 4508 breeding bald eagle HU's, 4365 wintering bald eagle HU's, 2286 black-capped chickadee HU's, 1680 white-tailed deer HU's, and 1756 muskrat HU's. The yellow warbler gained 71 HU's. Therefore, total target species estimated impacts were 28,587 HU's. Impacts on peregrine falcons were not quantified in terms of HU's. Projects have been proposed by an interagency team of biologists to mitigate the impacts of Albeni Falls on wildlife. The HEP was used to estimate benefits of proposed mitigation projects to target species. Through a series of proposed protection and enhancement actions, the mitigation plan will provide benefits of an estimated 28,590 target species HU's to mitigate Albeni Falls wildlife habitat values lost. 52 refs., 9 figs., 14 tabs.

  8. Final Report: African Power/Energy and Environmental Development Plan, July 1, 1994 - August 21, 1999

    SciTech Connect

    Butler, John M.

    1999-08-21

    In 1994 AEF signed a Cooperative Agreement with DOE to address a program called the African Power /Energy and Environmental Development Plan. The Program initially addressed five area: (1) Historical Black Colleges and Universities Energy/Environmental Program; (2) The Department of Energy and United States Private Industry Africa Program; (3) The Annual United States Energy Study Tour; (4) South African Training Program, and (5) South African Environmental Program. The programs were implemented in conjunction with DOE, institutions, agencies and the private sector support in the USA and within African nations. AEF has worked with government and technical representatives from 13 African nations and expanded the program to address sponsorship of South African students in Historical Black Colleges and Universities, supporting DOE trade missions through participation and planning, and giving presentations in the U.S., and Africa regarding business opportunities in the African energy sector. The programs implemented have also opened doors for the US private sector to seek business opportunities in Africa and for African nations to gain exposure to US products and services.

  9. Wildlife Protection, Mitigation, and Enhancement Planning Phase I, Dworshak Reservoir, Final Report.

    SciTech Connect

    Hansen, H. Jerome

    1988-02-01

    Under direction of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, and the subsequent Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, impacts to wildlife due to the development and operation of the US Army Corps of Engineers Dworshak Project have been examined. Using existing information, it has been determined that the project has resulted in the loss of 15,316 acres of elk habitat, 15,286 acres of white-tailed deer habitat, 16,986 acres of black bear habitat, 14,776 acres of ruffed grouse habitat, 13,616 acres of pileated woodpecker habitat, and 66 acres of yellow warbler habitat (scrub-shrub/red alder). Acreages of mallard, Canada goose, river otter, and beaver habitat could not be determined from existing information. The interagency work group has recommended that a HEP (Habitat Evaluation Procedure) be used to determine changes in the quantity and quality of target species habitat in the study area, due to the development and operation of Dworshak Reservoir. 60 refs., 3 figs., 6 tabs.

  10. Final long-term surveillance plan for the Spook, Wyoming, disposal site

    SciTech Connect

    1993-01-01

    A general license for the custody and long-term care of DOE Uranium Mill Tailings Remedial Action (UMTRA) Project permanent disposal sites was issued by the US Nuclear Regulatory Commission (NRC), and became effective on November 29, 1990. The general license will be in effect for a specific disposal site when the NRC accepts the disposal site`s long-term surveillance plan (LTSP) and concurs that remedial action is complete at that site. This document describes in detail the long-term surveillance activities for the Spook, Wyoming, disposal site, including monitoring, maintenance, and emergency measures necessary to fulfill the conditions of the general license, and to ensure that the disposal cell continues to comply with the UMTRA design standards.

  11. Geothermal energy planning and communication for native Americans. Final report. Draft

    SciTech Connect

    Robertson, T.A.

    1982-03-30

    The purpose was to explore and develop geothermal energy resources on Indian lands. Activities included the following: (1) continued review of Indian communities and their potential for geothermal energy development; (2) introduced tribes to the availability of geothermal energy and removed the barriers to the implementation of this energy source; (3) provided information by telephone and by mailing packages of information; (4) published articles on geothermal energy development in the UIPA newsletter and supplied articles to other Indian publication; (5) conducted two seminars specific to geothermal energy development on Indian lands in western states; (6) carried out survey of Indian attitudes and opinions toward energy in general and geothermal energy in specific; (7) incorporated geothermal energy development information in Economic Development Administration sponsored tribal government management programs, and (8) developed draft written material addressing Indian planning problems and supporting their ability to affect a more productive working relationship with government agencies and reduced dependency.

  12. Final record of decision/remedial action plan, nine sites, Sierra Army Depot, Lassen County, California

    SciTech Connect

    Arroyo, S.L.; Larson, A.M.; Parent, M.M.; Silvers, J.M.; Weaverling, P.H.

    1996-10-01

    This ROD/RAP presents the selected response actions for nine sites at SIAD. The response actions were selected by the US Department of the Army (Army) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments Reauthorization Act of 1986 (SARA)(collectively referred to as CERCLA), the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), and Section 6.8 of the California Health and Safety Code. This ROD/RAP includes the factual and legal basis for selecting the response action at each of the nine sites listed above. The data used to support the selected response action are contained in the Administrative Record for each site. The State of California as represented by the Department of Toxic Substances Control (DTSC), and the Lahontan Regional Water Quality Control Board (RWQCB) concur with the selected response action at each site.

  13. Nevada Test Site site treatment plan, final annual update. Revision 1

    SciTech Connect

    1998-04-01

    A Site Treatment Plan (STP) is required for facilities at which the US Department of Energy Nevada Operations Office (DOE/NV) generates or stores mixed waste (MW), defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act (RCRA) and a radioactive material subject to the Atomic Energy Act. This STP was written to identify specific treatment facilities for treating DOE/NV generated MW and provides proposed implementation schedules. This STP was approved by the Nevada Division of Environmental Protection (NDEP) and provided the basis for the negotiation and issuance of the FFCAct Consent Order (CO) dated March 6, 1996. The FFCAct CO sets forth stringent regulatory requirements to comply with the implementation of the STP.

  14. Maine State Planning Office, 1990--1991 heating season home heating fuels price survey. Final report

    SciTech Connect

    Not Available

    1991-12-31

    The 1990--1991 heating season was the first time in Maine that the Home Heating Fuels Survey was conducted for the United States Department of Energy by the Maine State Planning Office. This season also marked the first time that dealers were surveyed for a price for propane. Under a late agreement, the State of Maine was picked up by the regional survey of the Energy Information Agency in the beginning of October. This accounted for the weekly survey of the traditional participants in the State`s Home Heating Fuels Price Survey being supplemented by biweekly DOE surveys of separate survey samples of oil and propane dealers. The SPO sample identifies 36 dealers in the State of Maine, while the DOE sample was constructed around 22 oil dealers in Maine and New Hampshire and 29 propane dealers in Maine.

  15. Human Factors Assessment: The Passive Final Approach Spacing Tool (pFAST) Operational Evaluation

    NASA Technical Reports Server (NTRS)

    Lee, Katharine K.; Sanford, Beverly D.

    1998-01-01

    Automation to assist air traffic controllers in the current terminal and en route air traff ic environments is being developed at Ames Research Center in conjunction with the Federal Aviation Administration. This automation, known collectively as the Center-TRACON Automation System (CTAS), provides decision- making assistance to air traffic controllers through computer-generated advisories. One of the CTAS tools developed specifically to assist terminal area air traffic controllers is the Passive Final Approach Spacing Tool (pFAST). An operational evaluation of PFAST was conducted at the Dallas/Ft. Worth, Texas, Terminal Radar Approach Control (TRACON) facility. Human factors data collected during the test describe the impact of the automation upon the air traffic controller in terms of perceived workload and acceptance. Results showed that controller self-reported workload was not significantly increased or reduced by the PFAST automation; rather, controllers reported that the levels of workload remained primarily the same. Controller coordination and communication data were analyzed, and significant differences in the nature of controller coordination were found. Controller acceptance ratings indicated that PFAST was acceptable. This report describes the human factors data and results from the 1996 Operational Field Evaluation of Passive FAST.

  16. An improved ant colony optimization approach for optimization of process planning.

    PubMed

    Wang, JinFeng; Fan, XiaoLiang; Ding, Haimin

    2014-01-01

    Computer-aided process planning (CAPP) is an important interface between computer-aided design (CAD) and computer-aided manufacturing (CAM) in computer-integrated manufacturing environments (CIMs). In this paper, process planning problem is described based on a weighted graph, and an ant colony optimization (ACO) approach is improved to deal with it effectively. The weighted graph consists of nodes, directed arcs, and undirected arcs, which denote operations, precedence constraints among operation, and the possible visited path among operations, respectively. Ant colony goes through the necessary nodes on the graph to achieve the optimal solution with the objective of minimizing total production costs (TPCs). A pheromone updating strategy proposed in this paper is incorporated in the standard ACO, which includes Global Update Rule and Local Update Rule. A simple method by controlling the repeated number of the same process plans is designed to avoid the local convergence. A case has been carried out to study the influence of various parameters of ACO on the system performance. Extensive comparative experiments have been carried out to validate the feasibility and efficiency of the proposed approach. PMID:25097874

  17. Planning sample sizes when effect sizes are uncertain: The power-calibrated effect size approach.

    PubMed

    McShane, Blakeley B; Böckenholt, Ulf

    2016-03-01

    Statistical power and thus the sample size required to achieve some desired level of power depend on the size of the effect of interest. However, effect sizes are seldom known exactly in psychological research. Instead, researchers often possess an estimate of an effect size as well as a measure of its uncertainty (e.g., a standard error or confidence interval). Previous proposals for planning sample sizes either ignore this uncertainty thereby resulting in sample sizes that are too small and thus power that is lower than the desired level or overstate the impact of this uncertainty thereby resulting in sample sizes that are too large and thus power that is higher than the desired level. We propose a power-calibrated effect size (PCES) approach to sample size planning that accounts for the uncertainty associated with an effect size estimate in a properly calibrated manner: sample sizes determined on the basis of the PCES are neither too small nor too large and thus provide the desired level of power. We derive the PCES for comparisons of independent and dependent means, comparisons of independent and dependent proportions, and tests of correlation coefficients. We also provide a tutorial on setting sample sizes for a replication study using data from prior studies and discuss an easy-to-use website and code that implement our PCES approach to sample size planning. PMID:26651984

  18. From principles to practice: a spatial approach to systematic conservation planning in the deep sea.

    PubMed

    Wedding, L M; Friedlander, A M; Kittinger, J N; Watling, L; Gaines, S D; Bennett, M; Hardy, S M; Smith, C R

    2013-12-22

    Increases in the demand and price for industrial metals, combined with advances in technological capabilities have now made deep-sea mining more feasible and economically viable. In order to balance economic interests with the conservation of abyssal plain ecosystems, it is becoming increasingly important to develop a systematic approach to spatial management and zoning of the deep sea. Here, we describe an expert-driven systematic conservation planning process applied to inform science-based recommendations to the International Seabed Authority for a system of deep-sea marine protected areas (MPAs) to safeguard biodiversity and ecosystem function in an abyssal Pacific region targeted for nodule mining (e.g. the Clarion-Clipperton fracture zone, CCZ). Our use of geospatial analysis and expert opinion in forming the recommendations allowed us to stratify the proposed network by biophysical gradients, maximize the number of biologically unique seamounts within each subregion, and minimize socioeconomic impacts. The resulting proposal for an MPA network (nine replicate 400 × 400 km MPAs) covers 24% (1 440 000 km(2)) of the total CCZ planning region and serves as example of swift and pre-emptive conservation planning across an unprecedented area in the deep sea. As pressure from resource extraction increases in the future, the scientific guiding principles outlined in this research can serve as a basis for collaborative international approaches to ocean management. PMID:24197407

  19. An Improved Ant Colony Optimization Approach for Optimization of Process Planning

    PubMed Central

    Wang, JinFeng; Fan, XiaoLiang; Ding, Haimin

    2014-01-01

    Computer-aided process planning (CAPP) is an important interface between computer-aided design (CAD) and computer-aided manufacturing (CAM) in computer-integrated manufacturing environments (CIMs). In this paper, process planning problem is described based on a weighted graph, and an ant colony optimization (ACO) approach is improved to deal with it effectively. The weighted graph consists of nodes, directed arcs, and undirected arcs, which denote operations, precedence constraints among operation, and the possible visited path among operations, respectively. Ant colony goes through the necessary nodes on the graph to achieve the optimal solution with the objective of minimizing total production costs (TPCs). A pheromone updating strategy proposed in this paper is incorporated in the standard ACO, which includes Global Update Rule and Local Update Rule. A simple method by controlling the repeated number of the same process plans is designed to avoid the local convergence. A case has been carried out to study the influence of various parameters of ACO on the system performance. Extensive comparative experiments have been carried out to validate the feasibility and efficiency of the proposed approach. PMID:25097874

  20. A hybrid simulation approach for integrating safety behavior into construction planning: An earthmoving case study.

    PubMed

    Goh, Yang Miang; Askar Ali, Mohamed Jawad

    2016-08-01

    One of the key challenges in improving construction safety and health is the management of safety behavior. From a system point of view, workers work unsafely due to system level issues such as poor safety culture, excessive production pressure, inadequate allocation of resources and time and lack of training. These systemic issues should be eradicated or minimized during planning. However, there is a lack of detailed planning tools to help managers assess the impact of their upstream decisions on worker safety behavior. Even though simulation had been used in construction planning, the review conducted in this study showed that construction safety management research had not been exploiting the potential of simulation techniques. Thus, a hybrid simulation framework is proposed to facilitate integration of safety management considerations into construction activity simulation. The hybrid framework consists of discrete event simulation (DES) as the core, but heterogeneous, interactive and intelligent (able to make decisions) agents replace traditional entities and resources. In addition, some of the cognitive processes and physiological aspects of agents are captured using system dynamics (SD) approach. The combination of DES, agent-based simulation (ABS) and SD allows a more "natural" representation of the complex dynamics in construction activities. The proposed hybrid framework was demonstrated using a hypothetical case study. In addition, due to the lack of application of factorial experiment approach in safety management simulation, the case study demonstrated sensitivity analysis and factorial experiment to guide future research. PMID:26456000

  1. From principles to practice: a spatial approach to systematic conservation planning in the deep sea

    PubMed Central

    Wedding, L. M.; Friedlander, A. M.; Kittinger, J. N.; Watling, L.; Gaines, S. D.; Bennett, M.; Hardy, S. M.; Smith, C. R.

    2013-01-01

    Increases in the demand and price for industrial metals, combined with advances in technological capabilities have now made deep-sea mining more feasible and economically viable. In order to balance economic interests with the conservation of abyssal plain ecosystems, it is becoming increasingly important to develop a systematic approach to spatial management and zoning of the deep sea. Here, we describe an expert-driven systematic conservation planning process applied to inform science-based recommendations to the International Seabed Authority for a system of deep-sea marine protected areas (MPAs) to safeguard biodiversity and ecosystem function in an abyssal Pacific region targeted for nodule mining (e.g. the Clarion–Clipperton fracture zone, CCZ). Our use of geospatial analysis and expert opinion in forming the recommendations allowed us to stratify the proposed network by biophysical gradients, maximize the number of biologically unique seamounts within each subregion, and minimize socioeconomic impacts. The resulting proposal for an MPA network (nine replicate 400 × 400 km MPAs) covers 24% (1 440 000 km2) of the total CCZ planning region and serves as example of swift and pre-emptive conservation planning across an unprecedented area in the deep sea. As pressure from resource extraction increases in the future, the scientific guiding principles outlined in this research can serve as a basis for collaborative international approaches to ocean management. PMID:24197407

  2. Digital approach to planning computer-guided surgery and immediate provisionalization in a partially edentulous patient.

    PubMed

    Arunyanak, Sirikarn P; Harris, Bryan T; Grant, Gerald T; Morton, Dean; Lin, Wei-Shao

    2016-07-01

    This report describes a digital approach for computer-guided surgery and immediate provisionalization in a partially edentulous patient. With diagnostic data obtained from cone-beam computed tomography and intraoral digital diagnostic scans, a digital pathway of virtual diagnostic waxing, a virtual prosthetically driven surgical plan, a computer-aided design and computer-aided manufacturing (CAD/CAM) surgical template, and implant-supported screw-retained interim restorations were realized with various open-architecture CAD/CAM systems. The optional CAD/CAM diagnostic casts with planned implant placement were also additively manufactured to facilitate preoperative inspection of the surgical template and customization of the CAD/CAM-fabricated interim restorations. PMID:26868961

  3. Chicago air quality: PCB (polychlorinated biphenyl) air-monitoring plan. Phase 2. Final report

    SciTech Connect

    Not Available

    1986-04-01

    Polychlorinated biphenyls (PCBs) have significant commercial value because of their high chemical and physical stability, resistance to fire, low vapor pressure, and high dielectric (insulating) strength. The chemical stability and physical properties of PCBs that have made them commercially valuable also makes their safe disposal difficult. The environmentally preferred option for disposing of PCB containing wastes is incineration. In order to provide assurance that the operation of the SCA incinerator did not represent a threat to public health, the Illinois EPA initiated an air-sampling study in the vicinity to measure the levels of PCBs in the ambient air. Quality control checks conducted during the study revealed a previously unknown weakness in the analysis method that caused the quantitative results to be unreliable. A revised method has now been validated and will be used to further characterize ambient air quality and assess the environmental impact, if any, of the incineration of PCBs in Chicago. The document presents the overall plan for the project. Objectives: (1) Quantitatively determine PCB levels in the ambient air at three locations in the area of impacted by the SCA incinerator in southeast Chicago; (2) Correlate the air sampling results and meteorological conditions with the operational parameters from the SCA incinerator; (3) Assess the environmental impact associated with the incineration of PCBs; (4) Establish background concentrations of PCBs in the ambient air in the area.

  4. Comprehensive transit plan for the Virgin Islands. Technical report. Final report, September 1987-July 1988

    SciTech Connect

    Casey, R.F.; Schwenk, J.C.; Levinson, H.S.

    1989-01-01

    The report contains a description of the elements and recommendations of a transportation study of the islands of St. Thomas, St. Croix, and St. John in the U.S. Virgin Island archipelago. St. Thomas transit recommendations included the purchase of new buses, the construction of new maintenance facilities, a substantial increase in service levels, and an open competition for management and operation of the service. For St. Croix, a subsidized taxivan service was recommended on a trial basis on three routes; highway recommendations included an increase in roadway capacity along the Charlotte Amalie waterfront and reconstruction of critical intersections. Traffic engineering improvements, and the implementation of a paid on-street parking program were recommended for St. Thomas. Reconstruction of major intersections, several turning movement enhancements, construction of the long-proposed Christiansted bypass, the expression of off-street parking lots in Christiansted, and on-street parking management changes were recommended for St. Croix. The study endorsed current Department of Public Works plans to rehabilitate sections of major roadways on St. John. Of an institutional nature, it was recommended that a new governmental instrumentality be created to oversee mass transportation (including ferries), parking, and taxi services. Several possible sources of added revenue were discussed as potential means of providing the funding for the needed improvements.

  5. Setting priorities for action plans at Los Alamos National Laboratory. Final report

    SciTech Connect

    Miller, A.C.

    1992-09-30

    This report summarizes work done by Applied Decision Analysis (ADA) for Los Alamos National Laboratory (LANL) under Subcontract Number 9-XQ2-Y3837-1 with the University of California. The purpose of this work was to develop a method of setting priorities for environmental, safety, and health (ES&H) deficiencies at Los Alamos. The deficiencies were identified by a DOE Tiger Team that visited LANL in the fall of 1991, and by self assessments done by the Laboratory. ADA did the work described here between October 1991 and the end of September 1992. The ADA staff working on this project became part of a Risk Management Team in the Laboratory`s Integration and Coordination Office (ICO). During the project, the Risk Management Team produced a variety of documents describing aspects of the action-plan prioritization system. Some of those documents are attached to this report. Rather than attempt to duplicate their contents, this report provides a guide to those documents, and references them whenever appropriate.

  6. Operations, Maintenance, and Replacement 10-Year Plan 1990-1999 : Environmental Strategy. Final Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-09-01

    In operating and maintaining its regional power transmission system, Bonneville Power Administration (BPA) must address environmental concerns. Pollution sources and pathways for pollution migration, including potential contamination from hazardous or toxic materials, are present. BPA must develop and follow precautionary measures, respond to emergencies, minimize wastes, redress past problems, alert and train employees to problems and safety needs, constantly evaluate this effort and update the program for improvements and changes in regulations and technology. Part of BPA's mission is to conduct its operation, maintenance, and replacement programs in an environmentally sound manner. BPA recognizes its responsibility to be good stewards of the environment. BPA will meet its environmental obligations as set forth in environmental laws and regulations. BPA intends to make consistent and measurable progress toward meeting these responsibilities. The target for the 10-Year Plan is to achieve environmental compliance and meet the following goals: (1) protect human health and the environment; (2) avoid or limit liability (3) set up an effective internal management structure to maintain compliance; and (4) achieve cost-effective compliance. 6 figs.

  7. Growth management planning in New England: The role of EPA (No. 90-6103). Final report

    SciTech Connect

    Prewitt, E.

    1991-04-01

    Increasingly land use planning for growth management is seen as the only solution to the environmental degradation accompanying rapid growth in New England. In particular, growth management is viewed as the best preventative of non-point source pollution, which former EPA administrator Lee Thomas has called the agency's largest chunk of unfinished business. Because most growth management ordinances are relatively new, the hierarchy of authority among the different levels of government and private citizens is unclear. The report seeks to ascertain the proper role of EPA. It examines the experience of growth management, and the philosophical basis of federal involvement in land use. The majority of growth management activities have occured at the local, regional and state levels. EPA's extensive and vital involvement in growth management has been in cooperation with other levels of government in every case examined. EPA is on the right track in doing so. Its strengths with respect to growth management and the basis for its involvement, lie in its technical expertise, prestige and notoriety, and funding. The eight recommendations herein are based on those strengths.

  8. Statewide plan for utilization of scrap tires in Kansas. Final report, September 1993-May 1995

    SciTech Connect

    Nelson, R.G.; Hossain, M.

    1995-05-01

    This study was conducted to determine the current and future supply of scrap tire rubber and the feasibility of using scrap tires in Kansas for various purposes. The goal was to determine if a sufficient quantity of recycled rubber existed and what the cost would be to meet the ISTEA (Intermodal Surface Transportation Efficiency Act) requirements for 1995 and thereafter. The four tasks included in the study were: surveying scrap tire utilization plans in other states; inventory scrap tires in Kansas; estimating scrap tire generation in the future; and determiming cost effectiveness of various uses of scrap tires. Currently there are 4.5 to 5.5 million scrap tires in Kansas and the annual generation of scrap tires is estimated to be 2 to 3 million. The ISTEA mandate would require an estimated 367,000 scrap tires be recycled annually. KDOT has used more rubber in 1993 and 1994 than will be required by 1997 when the 20% required by ISTEA is in effect.

  9. Data collection plan for Phase 2 Alternative Fuels Bus Data Collection Program. Final report

    SciTech Connect

    Krenelka, T

    1993-07-01

    This document constitutes the plan for collecting and reporting data associated with a special set of transit bus demonstrations to be conducted under the Urban Bus Program of the Alternative Motor Fuels Act (AMFA) of 1988. This program, called the Phase 2 Bus Data Collection Program, serves as an adjunct to the Phase I Bus Data Collection Program, collecting detailed data on just a few buses to augment and enhance the Phase 1 data in fulfilling the urban bus requirements of AMFA. Demonstrations will be conducted at a few transit system locations throughout the US and will use alternative fuels and associated technologies to reduce undesirable transit bus exhaust emissions. Several organizations will be involved in the data collection; NREL will manage the program, analyze and store vehicle data, and make these data available through the Alternative Fuels Data Center. This information will enable transit agencies, equipment manufacturers, fuel suppliers, and government policy makers to make informed decisions about buying and using alternative fuels.

  10. Integrity assessment plan for PNL 300 area radioactive hazardous waste tank system. Final report

    SciTech Connect

    1996-03-01

    The Pacific Northwest Laboratory (PNL), operated by Battelle Memorial Institute under contract to the U.S. Department of Energy, operates tank systems for the U.S. Department of Energy, Richland Operations Office (DOE-RL), that contain dangerous waste constituents as defined by Washington State Department of Ecology (WDOE) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-040(18). Chapter 173-303-640(2) of the WAC requires the performance of integrity assessments for each existing tank system that treats or stores dangerous waste, except those operating under interim status with compliant secondary containment. This Integrity Assessment Plan (IAP) identifies all tasks that will be performed during the integrity assessment of the PNL-operated Radioactive Liquid Waste Systems (RLWS) associated with the 324 and 325 Buildings located in the 300 Area of the Hanford Site. It describes the inspections, tests, and analyses required to assess the integrity of the PNL RLWS (tanks, ancillary equipment, and secondary containment) and provides sufficient information for adequate budgeting and control of the assessment program. It also provides necessary information to permit the Independent, Qualified, Registered Professional Engineer (IQRPE) to approve the integrity assessment program.

  11. A systematic conservation planning approach to fire risk management in Natura 2000 sites.

    PubMed

    Foresta, Massimiliano; Carranza, Maria Laura; Garfì, Vittorio; Di Febbraro, Mirko; Marchetti, Marco; Loy, Anna

    2016-10-01

    A primary challenge in conservation biology is to preserve the most representative biodiversity while simultaneously optimizing the efforts associated with conservation. In Europe, the implementation of the Natura 2000 network requires protocols to recognize and map threats to biodiversity and to identify specific mitigation actions. We propose a systematic conservation planning approach to optimize management actions against specific threats based on two fundamental parameters: biodiversity values and threat pressure. We used the conservation planning software Marxan to optimize a fire management plan in a Natura 2000 coastal network in southern Italy. We address three primary questions: i) Which areas are at high fire risk? ii) Which areas are the most valuable for threatened biodiversity? iii) Which areas should receive priority risk-mitigation actions for the optimal effect?, iv) which fire-prevention actions are feasible in the management areas?. The biodiversity values for the Natura 2000 spatial units were derived from the distribution maps of 18 habitats and 89 vertebrate species of concern in Europe (Habitat Directive 92/43/EEC). The threat pressure map, defined as fire probability, was obtained from digital layers of fire risk and of fire frequency. Marxan settings were defined as follows: a) planning units of 40 × 40 m, b) conservation features defined as all habitats and vertebrate species of European concern occurring in the study area, c) conservation targets defined according with fire sensitivity and extinction risk of conservation features, and d) costs determined as the complement of fire probabilities. We identified 23 management areas in which to concentrate efforts for the optimal reduction of fire-induced effects. Because traditional fire prevention is not feasible for most of policy habitats included in the management areas, alternative prevention practices were identified that allows the conservation of the vegetation structure. The

  12. Yakima Tributary Access and Habitat Program : Action Plan Final Report 2002.

    SciTech Connect

    Myra, David; Ready, Carol A.

    2003-04-01

    This report covers activities conducted by the Yakima Tributary Access and Habitat Program under Bonneville Power Administration (BPA) grant project No. 2002-025-00 for fiscal year 2002. The Yakima Tributary Access and Habitat Program (YTAHP, Program) was organized to restore salmonid passage to Yakima tributaries that historically supported salmonids and improve habitat in areas where access is restored. Specifically, this program is designed to (a) screen unscreened diversion structures to prevent fish entrainment into artificial waterways; (b) provide for fish passage at man-made barriers, such as diversion dams, culverts, siphons and bridges; and (c) provide information and assistance to landowners interested in to contributing to the improvement of water quality, water reliability and stream habitat. The YTAHP developed from a number of groups actively engaged in watershed management, and/or habitat restoration within the Yakima River Basin. These groups include the Washington State Fish and Wildlife (WDFW), Kittitas County Conservation District (KCCD), North Yakima Conservation District (NYCD), Kittitas County Water Purveyors (KCWP), and Ahtanum Irrigation District (AID). The US Bureau of Reclamation (Reclamation) and Yakama Nation (YN) both participated in the development of the objectives of YTAHP. Other entities that will be involved during permitting or project review may include the YN, the federal Natural Resources Conservation Service (NRCS), the US Fish and Wildlife Service (USFWS), the National Marine Fisheries Service (NMFS), and US Army Corps of Engineers (COE). Achievements of YTAHP with BPA Action Plan funding during FY 2002 were to: (1) Establish contracts with RC&D and YTAHP participants. (2) Determine contract mechanism for MWH engineering services. (3) Provide engineering designs and services for 11 early action projects, including inverted siphons, pump and gravity diversion screening, diversion metering, rock weirs for improved fish passage

  13. Statistical planning and analysis for treatments of tar sand wastewater. Final report

    SciTech Connect

    Pirie, W.R.

    1984-03-01

    The first part of this report discusses the overall statistical planning, coordination and design for several tar sand wastewater treatment projects contracted by the Laramie Energy Technology Center (LETC) of the Department of Energy. A general discussion of the benefits of consistent statistical design and analysis for data-oriented projects is included, with recommendations for implementation. A detailed outline of the principles of general linear models design is followed by an introduction to recent developments in general linear models by ranks (GLMR) analysis and a comparison to standard analysis using Gaussian or normal theory (GLMN). A listing of routines contained in the VPI Nonparametric Statistics Package (NPSP), installed on the Cyber computer system at the University of Wyoming is included. Part 2 describes in detail the design and analysis for treatments by Gas Flotation, Foam Separation, Coagulation, and Ozonation, with comparisons among the first three methods. Rank methods are used for most analyses, and several detailed examples are included. For optimization studies, the powerful tools of response surface analysis (RSA) are employed, and several sections contain discussion on the benefits of RSA. All four treatment methods proved to be effective for removal of TOC and suspended solids from the wastewater. Because the processes and equipment designs were new, optimum removals were not achieved by these initial studies and reasons for that are discussed. Pollutant levels were nevertheless reduced to levels appropriate for recycling within the process, and for such reuses as steam generation, according to the DOE/LETC project officer. 12 refs., 8 figs., 21 tabs.

  14. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  15. Transzygomatic approach for the resection of large condylar osteochondromas using computer-assisted preoperative planning.

    PubMed

    Ye, Z-X; Yang, C; Chen, M-J

    2016-09-01

    The purpose of this study was to evaluate the outcomes of patients with large osteochondromas (OCs) treated via transzygomatic approach for exposure and local resection. All patients with large OCs treated by transzygomatic approach from 2006 through 2014 were investigated. The inclusion criteria were (1) condylar OC of exogenous type; (2) a mass that could be treated only via transzygomatic approach, as assessed using computer-assisted preoperative planning. The preliminary results evaluated included recurrence, joint form and function, occurrence of facial deformity, facial nerve function, and the condition of the zygomatic arch fixation. Other parameters assessed included tumour size and location and the length of follow-up. Ten patients with OCs were included in this study. All masses were located anteromedial to the condyle; the average maximal diameter was 33.15mm. During follow-up (average 28.5 months), the average maximum inter-incisal opening increased from 25.4mm to 32.0mm. Nine patients recovered without recurrence, a change in occlusion, secondary deformity, or nerve dysfunction. One patient had severe disc perforation and condylar resorption. The transzygomatic approach is applicable for the resection of large condylar OCs protruding anteromedially into the infratemporal space. Surgical simulations may help to identify the indications for this approach and to design the surgery. PMID:27131594

  16. A new Monte Carlo-based treatment plan optimization approach for intensity modulated radiation therapy.

    PubMed

    Li, Yongbao; Tian, Zhen; Shi, Feng; Song, Ting; Wu, Zhaoxia; Liu, Yaqiang; Jiang, Steve; Jia, Xun

    2015-04-01

    Intensity-modulated radiation treatment (IMRT) plan optimization needs beamlet dose distributions. Pencil-beam or superposition/convolution type algorithms are typically used because of their high computational speed. However, inaccurate beamlet dose distributions may mislead the optimization process and hinder the resulting plan quality. To solve this problem, the Monte Carlo (MC) simulation method has been used to compute all beamlet doses prior to the optimization step. The conventional approach samples the same number of particles from each beamlet. Yet this is not the optimal use of MC in this problem. In fact, there are beamlets that have very small intensities after solving the plan optimization problem. For those beamlets, it may be possible to use fewer particles in dose calculations to increase efficiency. Based on this idea, we have developed a new MC-based IMRT plan optimization framework that iteratively performs MC dose calculation and plan optimization. At each dose calculation step, the particle numbers for beamlets were adjusted based on the beamlet intensities obtained through solving the plan optimization problem in the last iteration step. We modified a GPU-based MC dose engine to allow simultaneous computations of a large number of beamlet doses. To test the accuracy of our modified dose engine, we compared the dose from a broad beam and the summed beamlet doses in this beam in an inhomogeneous phantom. Agreement within 1% for the maximum difference and 0.55% for the average difference was observed. We then validated the proposed MC-based optimization schemes in one lung IMRT case. It was found that the conventional scheme required 10(6) particles from each beamlet to achieve an optimization result that was 3% difference in fluence map and 1% difference in dose from the ground truth. In contrast, the proposed scheme achieved the same level of accuracy with on average 1.2 × 10(5) particles per beamlet. Correspondingly, the computation

  17. A new Monte Carlo-based treatment plan optimization approach for intensity modulated radiation therapy

    NASA Astrophysics Data System (ADS)

    Li, Yongbao; Tian, Zhen; Shi, Feng; Song, Ting; Wu, Zhaoxia; Liu, Yaqiang; Jiang, Steve; Jia, Xun

    2015-04-01

    Intensity-modulated radiation treatment (IMRT) plan optimization needs beamlet dose distributions. Pencil-beam or superposition/convolution type algorithms are typically used because of their high computational speed. However, inaccurate beamlet dose distributions may mislead the optimization process and hinder the resulting plan quality. To solve this problem, the Monte Carlo (MC) simulation method has been used to compute all beamlet doses prior to the optimization step. The conventional approach samples the same number of particles from each beamlet. Yet this is not the optimal use of MC in this problem. In fact, there are beamlets that have very small intensities after solving the plan optimization problem. For those beamlets, it may be possible to use fewer particles in dose calculations to increase efficiency. Based on this idea, we have developed a new MC-based IMRT plan optimization framework that iteratively performs MC dose calculation and plan optimization. At each dose calculation step, the particle numbers for beamlets were adjusted based on the beamlet intensities obtained through solving the plan optimization problem in the last iteration step. We modified a GPU-based MC dose engine to allow simultaneous computations of a large number of beamlet doses. To test the accuracy of our modified dose engine, we compared the dose from a broad beam and the summed beamlet doses in this beam in an inhomogeneous phantom. Agreement within 1% for the maximum difference and 0.55% for the average difference was observed. We then validated the proposed MC-based optimization schemes in one lung IMRT case. It was found that the conventional scheme required 106 particles from each beamlet to achieve an optimization result that was 3% difference in fluence map and 1% difference in dose from the ground truth. In contrast, the proposed scheme achieved the same level of accuracy with on average 1.2 × 105 particles per beamlet. Correspondingly, the computation time

  18. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 496: Buried Rocket Site, Antelope Lake, Tonopah Test Range

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    2004-05-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan details the activities necessary to close Corrective Action Unit 496: Buried Rocket Site, Antelope Lake. CAU 496 consists of one site located at the Tonopah Test Range, Nevada.

  19. Final monitoring plan for the Utica aquifer-North Lake Basin restoration project at Utica, Nebraska.

    SciTech Connect

    LaFreniere, L. M.

    2005-10-05

    restoration has also expanded to include the addition of a fourth groundwater extraction (GWEX) well and a dedicated treatment system (now required for containment and recovery of the carbon tetrachloride plume) that will be operated independently of the seasonal spray irrigation system. This document presents updated recommendations for initial groundwater sampling, for subsequent long-term groundwater monitoring, and for monitoring of the treatment systems that will be required to comply with the National Pollutant Discharge Elimination System (NPDES) permit requested from the Nebraska Department of Environmental Quality (NDEQ) for the Utica site. Argonne again suggests that the wetlands agencies accept responsibility for planning and implementing any monitoring that might be required to evaluate the progress of the wetlands ecosystem restoration.

  20. The GeoCitizen-approach: community-based spatial planning – an Ecuadorian case study

    PubMed Central

    Atzmanstorfer, Karl; Resl, Richard; Eitzinger, Anton; Izurieta, Xiomara

    2014-01-01

    Over the last years, geospatial web platforms, social media, and volunteered geographic information (VGI) have opened a window of opportunity for traditional Public Participatory GIS (PPGIS) to usher in a new era. Taking advantage of these technological achievements, this paper presents a new approach for a citizen-orientated framework of spatial planning that aims at integrating participatory community work into existing decision-making structures. One major cornerstone of the presented approach is the application of a social geoweb platform (the GeoCitizen platform) that combines geo-web technologies and social media in one single tool allowing citizens to collaboratively report observations, discuss ideas, solve, and monitor problems in their living environment at a local level. This paper gives an account of an ongoing participatory land-zoning process in the Capital District of Quito, Ecuador, where the GeoCitizen platform is applied in a long-term study. PMID:27019644

  1. Combining Computational Fluid Dynamics and Agent-Based Modeling: A New Approach to Evacuation Planning

    PubMed Central

    Epstein, Joshua M.; Pankajakshan, Ramesh; Hammond, Ross A.

    2011-01-01

    We introduce a novel hybrid of two fields—Computational Fluid Dynamics (CFD) and Agent-Based Modeling (ABM)—as a powerful new technique for urban evacuation planning. CFD is a predominant technique for modeling airborne transport of contaminants, while ABM is a powerful approach for modeling social dynamics in populations of adaptive individuals. The hybrid CFD-ABM method is capable of simulating how large, spatially-distributed populations might respond to a physically realistic contaminant plume. We demonstrate the overall feasibility of CFD-ABM evacuation design, using the case of a hypothetical aerosol release in Los Angeles to explore potential effectiveness of various policy regimes. We conclude by arguing that this new approach can be powerfully applied to arbitrary population centers, offering an unprecedented preparedness and catastrophic event response tool. PMID:21687788

  2. Quality assurance plan for placement of cold-cap grout, demonstration vault, Hanford Grout Vault Program. Final report

    SciTech Connect

    Harrington, P.T.; Wakeley, L.D.; Ernzen, J.J.; Walley, D.M.

    1992-08-01

    During FY 91, the U.S. Army Engineer Waterways Experiment Station (WES) developed a grout to be used as a cold cap, a nonradioactive layer, between the solidified waste and the cover blocks of a demonstration waste disposal vault at the U.S. Department of Energy Hanford Facility. This document recommends requirements for a quality assurance (QA) plan for field mixing and placing of the cold-cap grout during final closure of the demonstration vault. Preplacement activities emphasize selection and testing of materials that will match the performance of materials used in the WES grout. Materials sources and applicable American Society of Testing and Materials, American Concrete Institute, and American Petroleum Institute specifications and requirements are provided. Archiving of physical samples of materials is essential, in addition to careful maintenance of test reports and laboratory data. Full-scale field trial mixing and a detailed preconstruction conference are recommended. Placement activities focus on production and placement of a grout that remains sufficiently constant throughout all batches and meets performance requirements. QA activities must be coordinated between the batch plant and delivery site. Recommended sampling during placement includes cylinders cast for subsequent tests of compressive strength and for nondestructive evaluation and prisms cast for monitoring volume stability. A minimum of two lifts is recommended. Postplacement activities include long-term monitoring of the properties of grout specimens cast during placement. Minimum testing of cylinders includes pulse velocity, fundamental frequency, and unconfined compressive strength. Monitoring characteristics of the microstructure also are recommended. The QA plan should designate an organization to have responsibility for maintaining complete records, reports, and archived samples, including details of deviations from plans written before field placement.

  3. Technical program plan for the transitioning, decommissioning, and final disposition focus area

    SciTech Connect

    Not Available

    1994-01-01

    Hundreds of aging nuclear materials processing facilities within the Department of Energy`s (DOE) Weapons Complex are now being shut down and deactivated. These facilities, situated throughout the United States, will require a monumental effort to clean up safely and with minimal environmental insult. Current cleanup technologies tend to be labor intensive and expensive, they produce an unacceptably large volume of waste, and they expose workers to radioactive and other hazardous substances. This document describes an emerging program designed to develop and demonstrate new technical approaches to the decontamination and decommissioning (D&D) program for DOE`s nuclear materials processing facilities. Sponsored by the DOE Office of Technology Development within the Office of Environmental Restoration and Waste Management (EM), the program seeks to integrate the strengths of DOE`s technical, managerial, and systems engineering capabilities with those of industry, universities, and other government agencies. Once developed, these technologies will help to provide US industry with a competitive edge in the worldwide market that exists for improved environmental restoration and D&D services.

  4. Planning additional drilling campaign using two-space genetic algorithm: A game theoretical approach

    NASA Astrophysics Data System (ADS)

    Kumral, Mustafa; Ozer, Umit

    2013-03-01

    Grade and tonnage are the most important technical uncertainties in mining ventures because of the use of estimations/simulations, which are mostly generated from drill data. Open pit mines are planned and designed on the basis of the blocks representing the entire orebody. Each block has different estimation/simulation variance reflecting uncertainty to some extent. The estimation/simulation realizations are submitted to mine production scheduling process. However, the use of a block model with varying estimation/simulation variances will lead to serious risk in the scheduling. In the medium of multiple simulations, the dispersion variances of blocks can be thought to regard technical uncertainties. However, the dispersion variance cannot handle uncertainty associated with varying estimation/simulation variances of blocks. This paper proposes an approach that generates the configuration of the best additional drilling campaign to generate more homogenous estimation/simulation variances of blocks. In other words, the objective is to find the best drilling configuration in such a way as to minimize grade uncertainty under budget constraint. Uncertainty measure of the optimization process in this paper is interpolation variance, which considers data locations and grades. The problem is expressed as a minmax problem, which focuses on finding the best worst-case performance i.e., minimizing interpolation variance of the block generating maximum interpolation variance. Since the optimization model requires computing the interpolation variances of blocks being simulated/estimated in each iteration, the problem cannot be solved by standard optimization tools. This motivates to use two-space genetic algorithm (GA) approach to solve the problem. The technique has two spaces: feasible drill hole configuration with minimization of interpolation variance and drill hole simulations with maximization of interpolation variance. Two-space interacts to find a minmax solution

  5. Weather Information Communication (WINCOMM) VDL-3 and 1090ES Final Test Requirements, Test Plans, and Test Results

    NASA Technical Reports Server (NTRS)

    Griner, James H.; Jirberg, Russ; Frantz, Brian; Kachmar, Brian A.

    2006-01-01

    NASA s Aviation Safety Program was created for the purpose of making a significant reduction in the incidents of weather related aviation accidents by improving situational awareness. The objectives of that program are being met in part through advances in weather sensor technology, and in part through advances in the communications technology that are developed for use in the National Airspace System. It is this latter element, i.e., the improvements in aviation communication technologies, that is the focus of the Weather Information Communications project. This report describes the final flight test results completed under the WINCOMM project at the NASA Glenn Research Center of the 1090 Extended Squitter (1090ES) and VDL Mode 3 (VDL-3) data links as a medium for weather data exchange. It presents the use of 1090ES to meet the program objectives of sending broadcast turbulence information and the use of VDL-3 to send graphical weather images. This report provides the test requirements and test plans, which led to flight tests, as well as final results from flight testing. The reports define the changes made to both avionics and ground-based receivers as well as the ground infrastructure to support implementation of the recommended architecture, with a focus on the issues associated with these changes.

  6. Implementing a simpler approach to mission-based planning in a medical school.

    PubMed

    Sloan, Tod B; Kaye, Celia I; Allen, William R; Magness, Brian E; Wartman, Steven A

    2005-11-01

    Changes in the education, research, and health care environments have had a major impact on the way in which medical schools fulfill their missions, and mission-based management approaches have been suggested to link the financial information of mission costs and revenues with measures of mission activity and productivity. The authors describe a simpler system, termed Mission-Aligned Planning (MAP), and its development and implementation, during fiscal years 2002 and 2003, at the School of Medicine at the University of Texas Health Science Center at San Antonio, Texas. The MAP system merges financial measures and activity measures to allow a broad understanding of the mission activities, to facilitate strategic planning at the school and departmental levels. During the two fiscal years mentioned above, faculty of the school of medicine reported their annual hours spent in the four missions of teaching, research, clinical care, and administration and service in a survey designed by the faculty. A financial profit or loss in each mission was determined for each department by allocation of all departmental expenses and revenues to each mission. Faculty expenses (and related expenses) were allocated to the missions based on the percentage of faculty effort in each mission. This information was correlated with objective measures of mission activities. The assessment of activity allowed a better understanding of the real costs of mission activities by linking salary costs, assumed to be related to faculty time, to the missions. This was a basis for strategic planning and for allocation of institutional resources. PMID:16249297

  7. Acoustic sensor planning for gunshot location in national parks: a pareto front approach.

    PubMed

    González-Castaño, Francisco Javier; Alonso, Javier Vales; Costa-Montenegro, Enrique; López-Matencio, Pablo; Vicente-Carrasco, Francisco; Parrado-García, Francisco J; Gil-Castiñeira, Felipe; Costas-Rodríguez, Sergio

    2009-01-01

    In this paper, we propose a solution for gunshot location in national parks. In Spain there are agencies such as SEPRONA that fight against poaching with considerable success. The DiANa project, which is endorsed by Cabaneros National Park and the SEPRONA service, proposes a system to automatically detect and locate gunshots. This work presents its technical aspects related to network design and planning. The system consists of a network of acoustic sensors that locate gunshots by hyperbolic multi-lateration estimation. The differences in sound time arrivals allow the computation of a low error estimator of gunshot location. The accuracy of this method depends on tight sensor clock synchronization, which an ad-hoc time synchronization protocol provides. On the other hand, since the areas under surveillance are wide, and electric power is scarce, it is necessary to maximize detection coverage and minimize system cost at the same time. Therefore, sensor network planning has two targets, i.e., coverage and cost. We model planning as an unconstrained problem with two objective functions. We determine a set of candidate solutions of interest by combining a derivative-free descent method we have recently proposed with a Pareto front approach. The results are clearly superior to random seeding in a realistic simulation scenario. PMID:22303135

  8. Acoustic Sensor Planning for Gunshot Location in National Parks: A Pareto Front Approach

    PubMed Central

    González-Castaño, Francisco Javier; Alonso, Javier Vales; Costa-Montenegro, Enrique; López-Matencio, Pablo; Vicente-Carrasco, Francisco; Parrado-García, Francisco J.; Gil-Castiñeira, Felipe; Costas-Rodríguez, Sergio

    2009-01-01

    In this paper, we propose a solution for gunshot location in national parks. In Spain there are agencies such as SEPRONA that fight against poaching with considerable success. The DiANa project, which is endorsed by Cabaneros National Park and the SEPRONA service, proposes a system to automatically detect and locate gunshots. This work presents its technical aspects related to network design and planning. The system consists of a network of acoustic sensors that locate gunshots by hyperbolic multi-lateration estimation. The differences in sound time arrivals allow the computation of a low error estimator of gunshot location. The accuracy of this method depends on tight sensor clock synchronization, which an ad-hoc time synchronization protocol provides. On the other hand, since the areas under surveillance are wide, and electric power is scarce, it is necessary to maximize detection coverage and minimize system cost at the same time. Therefore, sensor network planning has two targets, i.e., coverage and cost. We model planning as an unconstrained problem with two objective functions. We determine a set of candidate solutions of interest by combining a derivative-free descent method we have recently proposed with a Pareto front approach. The results are clearly superior to random seeding in a realistic simulation scenario. PMID:22303135

  9. Quadratic programming-based approach for autonomous vehicle path planning in space

    NASA Astrophysics Data System (ADS)

    Chen, Yang; Han, Jianda; Wu, Huaiyu

    2012-07-01

    Path planning for space vehicles is still a challenging problem although considerable progress has been made over the past decades. The major difficulties are that most of existing methods only adapt to static environment instead of dynamic one, and also can not solve the inherent constraints arising from the robot body and the exterior environment. To address these difficulties, this research aims to provide a feasible trajectory based on quadratic programming(QP) for path planning in three-dimensional space where an autonomous vehicle is requested to pursue a target while avoiding static or dynamic obstacles. First, the objective function is derived from the pursuit task which is defined in terms of the relative distance to the target, as well as the angle between the velocity and the position in the relative velocity coordinates(RVCs). The optimization is in quadratic polynomial form according to QP formulation. Then, the avoidance task is modeled with linear constraints in RVCs. Some other constraints, such as kinematics, dynamics, and sensor range, are included. Last, simulations with typical multiple obstacles are carried out, including in static and dynamic environments and one of human-in-the-loop. The results indicate that the optimal trajectories of the autonomous robot in three-dimensional space satisfy the required performances. Therefore, the QP model proposed in this paper not only adapts to dynamic environment with uncertainty, but also can satisfy all kinds of constraints, and it provides an efficient approach to solve the problems of path planning in three-dimensional space.

  10. Emergency planning and mitigation at Vesuvius: A new evidence-based approach

    NASA Astrophysics Data System (ADS)

    Baxter, P. J.; Aspinall, W. P.; Neri, A.; Zuccaro, G.; Spence, R. J. S.; Cioni, R.; Woo, G.

    2008-12-01

    Disasters from explosive volcanic eruptions are infrequent and experience in emergency planning and mitigation for such events remains limited. The need for urgently developing more robust methods for risk assessment and decision making in volcanic crises has become increasingly apparent as world populations continue to expand in areas of active explosive volcanism. Nowhere is this more challenging than at Vesuvius, Italy, with hundreds of thousands of people living on the flanks of one of the most dangerous volcanoes in the world. We describe how a new paradigm, evidence-based volcanology, has been applied in EXPLORIS to contribute to crisis planning and management for when the volcano enters its next state of unrest, as well as in long-term land-use planning. The analytical approach we adopted enumerates and quantifies all the processes and effects of the eruptive hazards of the volcano known to influence risk, a scientific challenge that combines field data on the vulnerability of the built environment and humans in past volcanic disasters with theoretical research on the state of the volcano, and including evidence from the field on previous eruptions as well as numerical simulation modelling of eruptive processes. Formal probabilistic reasoning under uncertainty and a decision analysis approach have provided the basis for the development of an event tree for a future range of eruption types with probability paths and hypothetical casualty outcomes for risk assessment. The most likely future eruption scenarios for emergency planning were derived from the event tree and elaborated upon from the geological and historical record. Modelling the impacts in these scenarios and quantifying the consequences for the circumvesuvian area provide realistic assessments for disaster planning and for showing the potential risk-benefit of mitigation measures, the main one being timely evacuation, but include for consideration protecting buildings against dilute, low dynamic

  11. Maglev demonstration, design and develoment plan. Final report, February 1990-August 1994

    SciTech Connect

    Yarwood, G.; Gray, H.A.; Ligocki, M.P.; Whitten, G.Z.

    1994-08-01

    This study examines the feasibility of a regional high speed magnetic levitation (MAGLEV) system connecting the Greater Pittsburgh airport with strategic stops between the Midwest and the East Coast. A suburban commuter system, which operates on the same lines as the regional system, is also investigated. The first link of the regional and suburban MAGLEV system consists of a demonstration line connecting the Greater Pittsburgh International Airport with downtown Pittsburgh. This study considers the economic value of such a system from the aspects of transportation, manufacturing and economic development. The study concludes that an investment of $41 billion over the next 30 years would be required to build a regional MAGLEV system, cover its operating cost and produce enough additional transportation revenue to pay back part of this investment in the private sector financial markets. A substantial portion of this investment must come from the public sector. The additional economic activity generated by this investment would be over $78 billion. Over 675,000 person-years of work would be created by such a venture.The current regulatory approach to achieving ozone and related air quality standards is based on emissions estimation and modeling. In recent years, several studies have attempted to evaluate the emissions estimates and methods against ambient measurements by comparing non-methane organic compound (NMOC) species profiles, NMOC:NOx ratios, CO:NOx ratios, and using receptor modeling of NMOCs. Areas of interest have included the relative contributions of mobile, stationary, and biogenic sources, and evidence for underestimation of sources and/or missing sources. However, over the same time period the emission estimates have also been revised to reflect the latest information.

  12. Mission Planning and Decision Support for Underwater Glider Networks: A Sampling on-Demand Approach.

    PubMed

    Ferri, Gabriele; Cococcioni, Marco; Alvarez, Alberto

    2015-01-01

    This paper describes an optimal sampling approach to support glider fleet operators and marine scientists during the complex task of planning the missions of fleets of underwater gliders. Optimal sampling, which has gained considerable attention in the last decade, consists in planning the paths of gliders to minimize a specific criterion pertinent to the phenomenon under investigation. Different criteria (e.g., A, G, or E optimality), used in geosciences to obtain an optimum design, lead to different sampling strategies. In particular, the A criterion produces paths for the gliders that minimize the overall level of uncertainty over the area of interest. However, there are commonly operative situations in which the marine scientists may prefer not to minimize the overall uncertainty of a certain area, but instead they may be interested in achieving an acceptable uncertainty sufficient for the scientific or operational needs of the mission. We propose and discuss here an approach named sampling on-demand that explicitly addresses this need. In our approach the user provides an objective map, setting both the amount and the geographic distribution of the uncertainty to be achieved after assimilating the information gathered by the fleet. A novel optimality criterion, called A η , is proposed and the resulting minimization problem is solved by using a Simulated Annealing based optimizer that takes into account the constraints imposed by the glider navigation features, the desired geometry of the paths and the problems of reachability caused by ocean currents. This planning strategy has been implemented in a Matlab toolbox called SoDDS (Sampling on-Demand and Decision Support). The tool is able to automatically download the ocean fields data from MyOcean repository and also provides graphical user interfaces to ease the input process of mission parameters and targets. The results obtained by running SoDDS on three different scenarios are provided and show that So

  13. Mission Planning and Decision Support for Underwater Glider Networks: A Sampling on-Demand Approach

    PubMed Central

    Ferri, Gabriele; Cococcioni, Marco; Alvarez, Alberto

    2015-01-01

    This paper describes an optimal sampling approach to support glider fleet operators and marine scientists during the complex task of planning the missions of fleets of underwater gliders. Optimal sampling, which has gained considerable attention in the last decade, consists in planning the paths of gliders to minimize a specific criterion pertinent to the phenomenon under investigation. Different criteria (e.g., A, G, or E optimality), used in geosciences to obtain an optimum design, lead to different sampling strategies. In particular, the A criterion produces paths for the gliders that minimize the overall level of uncertainty over the area of interest. However, there are commonly operative situations in which the marine scientists may prefer not to minimize the overall uncertainty of a certain area, but instead they may be interested in achieving an acceptable uncertainty sufficient for the scientific or operational needs of the mission. We propose and discuss here an approach named sampling on-demand that explicitly addresses this need. In our approach the user provides an objective map, setting both the amount and the geographic distribution of the uncertainty to be achieved after assimilating the information gathered by the fleet. A novel optimality criterion, called Aη, is proposed and the resulting minimization problem is solved by using a Simulated Annealing based optimizer that takes into account the constraints imposed by the glider navigation features, the desired geometry of the paths and the problems of reachability caused by ocean currents. This planning strategy has been implemented in a Matlab toolbox called SoDDS (Sampling on-Demand and Decision Support). The tool is able to automatically download the ocean fields data from MyOcean repository and also provides graphical user interfaces to ease the input process of mission parameters and targets. The results obtained by running SoDDS on three different scenarios are provided and show that So

  14. Multimodal Logistics Network Design over Planning Horizon through a Hybrid Meta-Heuristic Approach

    NASA Astrophysics Data System (ADS)

    Shimizu, Yoshiaki; Yamazaki, Yoshihiro; Wada, Takeshi

    Logistics has been acknowledged increasingly as a key issue of supply chain management to improve business efficiency under global competition and diversified customer demands. This study aims at improving a quality of strategic decision making associated with dynamic natures in logistics network optimization. Especially, noticing an importance to concern with a multimodal logistics under multiterms, we have extended a previous approach termed hybrid tabu search (HybTS). The attempt intends to deploy a strategic planning more concretely so that the strategic plan can link to an operational decision making. The idea refers to a smart extension of the HybTS to solve a dynamic mixed integer programming problem. It is a two-level iterative method composed of a sophisticated tabu search for the location problem at the upper level and a graph algorithm for the route selection at the lower level. To keep efficiency while coping with the resulting extremely large-scale problem, we invented a systematic procedure to transform the original linear program at the lower-level into a minimum cost flow problem solvable by the graph algorithm. Through numerical experiments, we verified the proposed method outperformed the commercial software. The results indicate the proposed approach can make the conventional strategic decision much more practical and is promising for real world applications.

  15. Interactive approach to segment organs at risk in radiotherapy treatment planning

    NASA Astrophysics Data System (ADS)

    Dolz, Jose; Kirisli, Hortense A.; Viard, Romain; Massoptier, Laurent

    2014-03-01

    Accurate delineation of organs at risk (OAR) is required for radiation treatment planning (RTP). However, it is a very time consuming and tedious task. The use in clinic of image guided radiation therapy (IGRT) becomes more and more popular, thus increasing the need of (semi-)automatic methods for delineation of the OAR. In this work, an interactive segmentation approach to delineate OAR is proposed and validated. The method is based on the combination of watershed transformation, which groups small areas of similar intensities in homogeneous labels, and graph cuts approach, which uses these labels to create the graph. Segmentation information can be added in any view - axial, sagittal or coronal -, making the interaction with the algorithm easy and fast. Subsequently, this information is propagated within the whole volume, providing a spatially coherent result. Manual delineations made by experts of 6 OAR - lungs, kidneys, liver, spleen, heart and aorta - over a set of 9 computed tomography (CT) scans were used as reference standard to validate the proposed approach. With a maximum of 4 interactions, a Dice similarity coefficient (DSC) higher than 0.87 was obtained, which demonstrates that, with the proposed segmentation approach, only few interactions are required to achieve similar results as the ones obtained manually. The integration of this method in the RTP process may save a considerable amount of time, and reduce the annotation complexity.

  16. Scaling the dynamic approach to path planning and control: Competition among behavioral constraints

    SciTech Connect

    Large, E.W.; Bajcsy, R.; Christensen, H.I.

    1999-01-01

    The dynamic-systems approach to robot path planning defines a dynamics of robot behavior in which task constraints contribute independently to a nonlinear vector field that governs robot actions. The authors address problems that arise in scaling this approach to handle complex behavioral requirements. They propose a dynamics that operates in the space of task constraints, determining the relative contribution of each constraint to the behavioral dynamics. Competition among task constraints is able to deal with problems that arise when combining constraint contributions, making it possible to specify tasks that are more complex than simple navigation. To demonstrate the utility of this approach, the authors design a system of two agents to perform a cooperative navigation task. They show how competition among constraints enables agents to make decisions regarding which behavior to execute in a given situation, resulting in the execution of sequences of behaviors that satisfy task requirements. The authors discuss the scalability of the competitive-dynamics approach to the design of more complex autonomous systems.

  17. A network flow approach for tactical resource planning in outpatient clinics.

    PubMed

    Nguyen, Thu Ba T; Sivakumar, Appa Iyer; Graves, Stephen C

    2015-06-01

    This paper introduces a deterministic model to plan the physician requirements for outpatient clinics to achieve service targets for the appointment lead-times of patients. The Ministry of Health of Singapore has established targets for the median, 95th percentile, and 100th percentile of appointment lead-times for patients, since long appointment postponements are regarded as being unacceptable for health care services. The study is to match the capacity of the healthcare providers to the patient demand for a re-entry system, subject to restrictions on the appointment lead-times for patients. We propose a mixed-integer programming model for planning capacity with the minimization of the maximum required capacity as its objective. In the model we assume a finite planning horizon, deterministic arrivals, multiple types of patients, identical physicians, and dependent demand between types of patients. We solve this model with a Branch and Cut algorithm. We test the model with numerical experiments using real data from the chosen specialty at the outpatient clinic of the studied hospital. The results show the value of the proposed model via a systematic push-pull mechanism in scheduling patients' requests to minimize the objective. The clinic should use one of the appointment lead-time targets to determine the patients' appointment dates. Finally, from the sensitivity analyses we demonstrate that the objective is negatively correlated with first-visit patients' appointment lead-time targets, the discharge rates, and the re-visit patients' mean appointment lead-time; we find a positive correlation between the first-visit patients' mean appointment lead-time and the appointment lead-time targets. PMID:24879403

  18. Establishing Baseline Key Ecological Functions of Fish and Wildlife for Subbasin Planning, Final Report 2001.

    SciTech Connect

    O'Neil, Thomas A.

    2001-08-01

    As we strive to manage the Columbia River Basin for its sustainable, productive, and diverse ecosystems, we are, in fact, managing these systems to provide an a array of ecological functions upon which these systems are based. These ecological functions avail themselves as an important tool with which to assess our historical and current habitat conditions, as well as proposed future or ideal conditions under differing management scenarios. So what are key ecological functions (KEFs) and which ones are involved? Key ecological functions refer to the major ecological roles played by an organism in its ecosystem that can affect environmental conditions for themselves or other species, or that directly influences other organisms (Marcot and Vander Heyden 2001). Currently, 111 KEFs are identified for fish and wildlife species as a result of Task 1 of this project. Even though the assessment phase of this project encompasses the entire Columbia River Basin, only a subset of KEFs (58) that are associated with the lotic systems, which includes 7 anadromous fish, 20 co-occurring resident fish, and 137 wildlife species linked to salmon are addressed. Since the basin has not be systematically surveyed for each fish and wildlife species, baseline conditions for each KEF are determined by developing basin-wide species range maps using the following information: wildlife-habitat type associations, county and ecoprovince occurrence, literature (like individual state atlases), and expert peer review. This approach produced a set of species range maps that depict a species potential for occurrence given the current or historic conditions. It is this potential occurrence that serves as a baseline condition to determine the key ecological functions. The results offer a framework and a set of baseline assessments that can be done with existing databases. Thus, allowing resource managers the ability to assess future management activities against this norm and guide their activities in

  19. Three Dimensional Rover/Lander/Orbiter Mission-Planning (3D-ROMPS) System: A Modern Approach to Mission Planning

    NASA Technical Reports Server (NTRS)

    Scharfe, Nathan D.

    2005-01-01

    NASA's current mission planning system is based on point design, two-dimensional display, spread sheets, and report technology. This technology does not enable engineers to analyze the results of parametric studies of missions plans. This technology will not support the increased observational complexity and data volume of missions like Cassini, Mars Reconnaissance Orbiter (MRO), Mars Science Laboratory (MSL), and Mars Sample Return (MSR). The goal of the 3D-ROMPS task has been to establish a set of operational mission planning and analysis tools in the Image Processing Laboratory (IPL) Mission Support Area (MSA) that will respond to engineering requirements for planning future Solar System Exploration (SSE) missions using a three-dimensional display.

  20. Collaborative multi-stakeholder approach to drafting flood risk management plans in Wallonia, Belgium

    NASA Astrophysics Data System (ADS)

    Maroy, Edith; Javaux, Mathieu; Vandermosten, Pierre; Englebert, Benjamin

    2015-04-01

    The Flood Directive 2007/60/CE establishes a common framework within the European Union for assessing and reducing risks posed by floods on human health, the environment, economic activity and cultural heritage. For that purpose, Member States had to establish flood areas and flood risk maps, and subsequently, flood risk management plans (due December 2015). According to the Directive, special attention is to be paid to international coordination for transboundary water courses, integrated management approaches at the catchment scale, cost-effectiveness of measures and public involvement. Management measures must focus on reducing the probability of flooding and the potential consequences of flooding. They must cover prevention, protection and preparedness and must take into account relevant aspects, such as water management, soil management, spatial planning, land use and nature conservation. Floods in Wallonia mostly originate from overflowing of both little sloped rivers and highly reactive rivers but also, from concentrated runoff in the intensely cultivated and erosion-prone region north of the Sambre-Meuse axis. Consequently, walloon flood area maps not only show flood areas based on hydraulic modelling and observations but also runoff concentration axis in agricultural areas. Now released to the public, this information can be used to assess the risk of damage for land planning and erosion control strategies. Incidentally, some 166 km2 were mapped as flood hazard area with a return period of 25 years, 28.8 of which are urbanized or destined to urbanisation and counting of number of approximatively 39.000 people living in those areas. Flood area and flood risk maps should be the starting point of elaborating flood risk management plans. In order to involve the diversity of water managers and stakeholders in the drafting of a management plan for hydrographic districts in Wallonia, responsible authorities decided to mandate scientists and engineers to organize

  1. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Appendix D. Final report

    SciTech Connect

    1988-07-01

    This appendix is an assessment of the present conditions of the inactive uranium mill site near Mexican Hat, Utah. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan. Plan is to characterize the conditions at the mill and tailings site so that the Remedial Action Contractor may complete final designs of the remedial action.

  2. Voluntary Truck and Bus Fuel-Economy-Program marketing plan. Final technical report, September 29, 1980-January 29, 1982

    SciTech Connect

    1982-01-01

    The aim of the program is to improve the utilization of fuel by commercial trucks and buses by updating and implementing specific approaches for educating and monitoring the trucking industry on methods and means of conserving fuels. The following outlines the marketing plan projects: increase use of program logo by voluntary program members and others; solicit trade publication membership and support; brief Congressional delegations on fuel conservation efforts; increase voluntary program presence before trade groups; increase voluntary program presence at truck and trade shows; create a voluntary program display for use at trade shows and in other areas; review voluntary program graphics; increase voluntary program membership; and produce placemats carrying fuel conservation messages; produce a special edition of Fuel Economy News, emphasizing the driver's involvement in fuel conservation; produce posters carrying voluntary program fuel conservation message. Project objectives, activities, and results for each project are summarized.

  3. Planning a Year-Round School Operation (A Case-Study of the Valley View School District 45-15 Plan). Final Report.

    ERIC Educational Resources Information Center

    Rogge, William M.

    The year-round school operation of the Valley View School District is described from its planning stages through the implementation of the plans. A "45-15 Plan" provides for each pupil forty-five days of instruction and fifteen equivalent days of vacation. With the cycle repeated four times each year, one-fourth of the pupils are on vacation at…

  4. Bicultural Socialization Project: A Group Process Approach to Bilingual Instruction - Title VII. Final Report, 1970-71.

    ERIC Educational Resources Information Center

    Baker, Jean M.

    This final report relates to student socialization through a bilingual (Spanish/English), bicultural program involving 6 second grades in 3 schools of Phoenix, Arizona, for the 1970-71 school year. As reported, the major objective of the program was to develop and implement a group process approach to bilingual education; in addition, classroom…

  5. Approaches for the Application of Physiologically Based Pharmacokinetic (PBPK) Models and Supporting Data in Risk Assessment (Final Report)

    EPA Science Inventory

    This final report, Approaches for the Application of Physiologically Based Pharmacokinetic (PBPK) Models and Supporting Data in Risk Assessment addresses the application and evaluation of PBPK models for risk assessment purposes. These models represent an important class o...

  6. 76 FR 54288 - Notice of Final Federal Agency Actions on Proposed Bridge and Approach Roadways in Nevada and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Bridge and Approach... proposed Laughlin-Bullhead City Bridge project in Laughlin, Clark County, Nevada; and in Bullhead City... claim seeking judicial review of the Federal agency actions on the bridge and roadway project will...

  7. An Approach to Developing Independent Learning and Non-Technical Skills Amongst Final Year Mining Engineering Students

    ERIC Educational Resources Information Center

    Knobbs, C. G.; Grayson, D. J.

    2012-01-01

    There is mounting evidence to show that engineers need more than technical skills to succeed in industry. This paper describes a curriculum innovation in which so-called "soft" skills, specifically inter-personal and intra-personal skills, were integrated into a final year mining engineering course. The instructional approach was designed to…

  8. The Education of Attention as Explanation of Variability of Practice Effects : Learning the Final Approach Phase in a Flight Simulator

    ERIC Educational Resources Information Center

    Huet, Michael; Jacobs, David M.; Camachon, Cyril; Missenard, Olivier; Gray, Rob; Montagne, Gilles

    2011-01-01

    The present study reports two experiments in which a total of 20 participants without prior flight experience practiced the final approach phase in a fixed-base simulator. All participants received self-controlled concurrent feedback during 180 practice trials. Experiment 1 shows that participants learn more quickly under variable practice…

  9. Biologically optimized helium ion plans: calculation approach and its in vitro validation

    NASA Astrophysics Data System (ADS)

    Mairani, A.; Dokic, I.; Magro, G.; Tessonnier, T.; Kamp, F.; Carlson, D. J.; Ciocca, M.; Cerutti, F.; Sala, P. R.; Ferrari, A.; Böhlen, T. T.; Jäkel, O.; Parodi, K.; Debus, J.; Abdollahi, A.; Haberer, T.

    2016-06-01

    Treatment planning studies on the biological effect of raster-scanned helium ion beams should be performed, together with their experimental verification, before their clinical application at the Heidelberg Ion Beam Therapy Center (HIT). For this purpose, we introduce a novel calculation approach based on integrating data-driven biological models in our Monte Carlo treatment planning (MCTP) tool. Dealing with a mixed radiation field, the biological effect of the primary 4He ion beams, of the secondary 3He and 4He (Z  =  2) fragments and of the produced protons, deuterons and tritons (Z  =  1) has to be taken into account. A spread-out Bragg peak (SOBP) in water, representative of a clinically-relevant scenario, has been biologically optimized with the MCTP and then delivered at HIT. Predictions of cell survival and RBE for a tumor cell line, characterized by {{(α /β )}\\text{ph}}=5.4 Gy, have been successfully compared against measured clonogenic survival data. The mean absolute survival variation ({μΔ \\text{S}} ) between model predictions and experimental data was 5.3%  ±  0.9%. A sensitivity study, i.e. quantifying the variation of the estimations for the studied plan as a function of the applied phenomenological modelling approach, has been performed. The feasibility of a simpler biological modelling based on dose-averaged LET (linear energy transfer) has been tested. Moreover, comparisons with biophysical models such as the local effect model (LEM) and the repair-misrepair-fixation (RMF) model were performed. {μΔ \\text{S}} values for the LEM and the RMF model were, respectively, 4.5%  ±  0.8% and 5.8%  ±  1.1%. The satisfactorily agreement found in this work for the studied SOBP, representative of clinically-relevant scenario, suggests that the introduced approach could be applied for an accurate estimation of the biological effect for helium ion radiotherapy.

  10. Biologically optimized helium ion plans: calculation approach and its in vitro validation.

    PubMed

    Mairani, A; Dokic, I; Magro, G; Tessonnier, T; Kamp, F; Carlson, D J; Ciocca, M; Cerutti, F; Sala, P R; Ferrari, A; Böhlen, T T; Jäkel, O; Parodi, K; Debus, J; Abdollahi, A; Haberer, T

    2016-06-01

    Treatment planning studies on the biological effect of raster-scanned helium ion beams should be performed, together with their experimental verification, before their clinical application at the Heidelberg Ion Beam Therapy Center (HIT). For this purpose, we introduce a novel calculation approach based on integrating data-driven biological models in our Monte Carlo treatment planning (MCTP) tool. Dealing with a mixed radiation field, the biological effect of the primary (4)He ion beams, of the secondary (3)He and (4)He (Z  =  2) fragments and of the produced protons, deuterons and tritons (Z  =  1) has to be taken into account. A spread-out Bragg peak (SOBP) in water, representative of a clinically-relevant scenario, has been biologically optimized with the MCTP and then delivered at HIT. Predictions of cell survival and RBE for a tumor cell line, characterized by [Formula: see text] Gy, have been successfully compared against measured clonogenic survival data. The mean absolute survival variation ([Formula: see text]) between model predictions and experimental data was 5.3%  ±  0.9%. A sensitivity study, i.e. quantifying the variation of the estimations for the studied plan as a function of the applied phenomenological modelling approach, has been performed. The feasibility of a simpler biological modelling based on dose-averaged LET (linear energy transfer) has been tested. Moreover, comparisons with biophysical models such as the local effect model (LEM) and the repair-misrepair-fixation (RMF) model were performed. [Formula: see text] values for the LEM and the RMF model were, respectively, 4.5%  ±  0.8% and 5.8%  ±  1.1%. The satisfactorily agreement found in this work for the studied SOBP, representative of clinically-relevant scenario, suggests that the introduced approach could be applied for an accurate estimation of the biological effect for helium ion radiotherapy. PMID:27203864

  11. Model-based approach for planning and evaluation of confocal measurements of rough surfaces

    NASA Astrophysics Data System (ADS)

    Mauch, F.; Osten, W.

    2014-10-01

    Confocal sensors, along with white light interferometers, have been considered promising candidates for replacing traditional tactile sensors in the inspection of rough surfaces for several years now. However, despite their obvious advantages concerning measurement speed and a non-contact working principle, their acceptance for routine measurement tasks in industry is still unsatisfactory. This is presumably because the mechanisms that limit the resolution of such sensors are more complex than those of tactile sensors. The planning for the measurements, e.g. choosing the proper objective lens, is still a very challenging task. Therefore, many confocal measurements produce erroneous results because of improperly chosen sensor parameters. At the same time, the behavior of improperly configured sensors is not well understood, rendering the recognition of erroneous measurements a hard task as well. Current national as well as international technical standards suggest an approach based on the spatial frequencies of the surface profile and a cut-off frequency that is characteristic for the sensor. While this is in perfect analogy to optical two-dimensional imaging devices, we present theoretical as well as experimental reasoning against this approach. Instead, we propose an approach based on local surface curvatures and the radii of curvature of the illuminating wavefronts.

  12. New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect

    Nelson, L. O.

    2007-06-12

    This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

  13. Planning for Water Resources of South Florida: A system dynamics modeling approach

    NASA Astrophysics Data System (ADS)

    Ahmad, S.

    2006-12-01

    With enormous growth in population, changes in land use, substantial agriculture activity, and need to protect vital environmental resources such as Everglades, south Florida presents a very challenging case for water resources planning. Working with stakeholders to meet challenges of water resources planning in south Florida, we are exploring important questions: (a) What are some major changes in terms of population growth, land use, water demand, and water availability that can be expected in south Florida in the short and long term?; (b) What would be the major hydrologic effects of climate variability and change on south Florida's water system?; (c) How could Florida's water system adapt to anticipated population growth, urban sprawl, and climate change?; and (d) What are the most promising (cost effective) policies for south Florida's water management in response to growth and climate change? We are developing a decision support (DS) framework, using system dynamics modeling approach, to evaluate and compare different short and long term water management policies. Besides climate information, the integrated DS framework considers other major factors that influence water demand and availability including: demographic changes, land use changes, economy, and environment. We analyze how increased or better use of climate information can lead to better, more cost-effective decisions for sustainable management of water resources. Using games/scenarios involving decision makers, we evaluate cost-effectiveness of different policy choices for short and long term water management in the region. We evaluate policies based on both demand side management through efficiency and conservation (low flow appliances, xeriscaping, pricing) and supply side management (desalination, water reuse). The outcome is a framework for exploring cost-effectiveness of alternative water management policies. The research advances work on water resources planning considering the impacts of

  14. Reformulation linearization technique based branch-and-reduce approach applied to regional water supply system planning

    NASA Astrophysics Data System (ADS)

    Lan, Fujun; Bayraksan, Güzin; Lansey, Kevin

    2016-03-01

    A regional water supply system design problem that determines pipe and pump design parameters and water flows over a multi-year planning horizon is considered. A non-convex nonlinear model is formulated and solved by a branch-and-reduce global optimization approach. The lower bounding problem is constructed via a three-pronged effort that involves transforming the space of certain decision variables, polyhedral outer approximations, and the Reformulation Linearization Technique (RLT). Range reduction techniques are employed systematically to speed up convergence. Computational results demonstrate the efficiency of the proposed algorithm; in particular, the critical role range reduction techniques could play in RLT based branch-and-bound methods. Results also indicate using reclaimed water not only saves freshwater sources but is also a cost-effective non-potable water source in arid regions. Supplemental data for this article can be accessed at http://dx.doi.org/10.1080/0305215X.2015.1016508.

  15. A variational dynamic programming approach to robot-path planning with a distance-safety criterion

    NASA Technical Reports Server (NTRS)

    Suh, Suk-Hwan; Shin, Kang G.

    1988-01-01

    An approach to robot-path planning is developed by considering both the traveling distance and the safety of the robot. A computationally-efficient algorithm is developed to find a near-optimal path with a weighted distance-safety criterion by using a variational calculus and dynamic programming (VCDP) method. The algorithm is readily applicable to any factory environment by representing the free workspace as channels. A method for deriving these channels is also proposed. Although it is developed mainly for two-dimensional problems, this method can be easily extended to a class of three-dimensional problems. Numerical examples are presented to demonstrate the utility and power of this method.

  16. Lessons learned from New York's community approach to advance care planning and MOLAT.

    PubMed

    Bomba, Patricia A; Orem, Katie

    2015-01-01

    This article reviews the lessons learned from the development and implementation of New York's community approach to advance care planning (ACP) as a wellness initiative and the key components of the complementary programs: Community Conversations on Compassionate Care (CCCC) and Medical Orders for Life-Sustaining Treatment (MOLST). Shared, informed medical decision-making is a patient-centered process that is critical to ensuring patient preferences for care are honored at the end of life. Providers must be trained, qualified, and comfortable with the discussions needed for effective shared, informed medical decision-making. Development, implementation, outcomes, lessons learned and sustainability of the CCCC and MOLST programs highlight the success of a healthcare and community collaborative initiative focused on improving care at the end of life. Community data support the value of implementing the CCCC and New York's MOLST throughout the country. PMID:25813415

  17. A holistic approach towards optimal planning of hybrid renewable energy systems: Combining hydroelectric and wind energy

    NASA Astrophysics Data System (ADS)

    Dimas, Panagiotis; Bouziotas, Dimitris; Efstratiadis, Andreas; Koutsoyiannis, Demetris

    2014-05-01

    Hydropower with pumped storage is a proven technology with very high efficiency that offers a unique large-scale energy buffer. Energy storage is employed by pumping water upstream to take advantage of the excess of produced energy (e.g. during night) and next retrieving this water to generate hydro-power during demand peaks. Excess energy occurs due to other renewables (wind, solar) whose power fluctuates in an uncontrollable manner. By integrating these with hydroelectric plants with pumped storage facilities we can form autonomous hybrid renewable energy systems. The optimal planning and management thereof requires a holistic approach, where uncertainty is properly represented. In this context, a novel framework is proposed, based on stochastic simulation and optimization. This is tested in an existing hydrosystem of Greece, considering its combined operation with a hypothetical wind power system, for which we seek the optimal design to ensure the most beneficial performance of the overall scheme.

  18. Participatory approach in planning for low carbon and eco-village: A case of Felda Taib Andak

    NASA Astrophysics Data System (ADS)

    Ngah, I.; Zulkifli, A. S.

    2014-02-01

    Participatory approaches have becoming an important tool in planning of sustainable communities. Although participation is conceived as a malleable concept there are certain methods that planners can adopt to ensure a meaningful participation. This paper will provide some experiences and lessons on how participatory planning could be carried out with local people, the role of planners in the process of plan preparation, implementation and the outcome. This paper first explores some of the meanings of participation, the criteria of participation and the approaches of participation in planning for sustainable community. The second part is a description and discussion of how participatory approach in planning was applied in planning for low carbon and eco-village in Iskandar Malaysia based on a case study of planning of Felda Taib Andak scheme. The participatory approach involved a series of meetings, site visit and focus group discussions with representative of the Felda Village to come out with action plan and actual implementation. From focus group discussions a roadmap consisted of a vision and objectives and a dozen actions were formulated and adopted. In the process of implementation the main implementation & coordination committee was form in which the author (planner) is one of its members to look into fund raising & implementation strategies together with the local people. Several task forces or sub committees responsible to implement the dozen actions were also formed. The outcome was encouraging in which some of the actions such as planting of bamboo trees, reduction of pollution from oil palm factory and bicycling activities has been implemented and shown progress. The paper also highlights some of the issues and challenges in participatory planning.

  19. Motion planning for mobile manipulators using the FSP (full space parameterization) approach

    SciTech Connect

    Pin, F.G.; Morgansen, K.A.; Tulloch, F.A.; Hacker, C.J.

    1996-05-01

    The efficient utilization of the motion capabilities of mobile manipulators, i.e., manipulators mounted on mobile platforms, requires the resolution of the kinematically redundant system formed by the addition of the degrees of freedom (d.o.f.) of the platform to those of the manipulator. At the velocity level, the linearized Jacobian equation for such a redundant system represents an underspecified system of algebraic equations. In addition, constraints such as obstacle avoidance or joint limits may appear at any time during the trajectory of the system. A method, which we named the FSP (Full Space Parameterization), has recently been developed to resolve such underspecified systems with constraints that may vary in time and in number during a single trajectory. In this paper, we review the principles of the FSP and give analytical solutions for the constrained motion case, with a general optimization criterion for resolving the redundancy. We then focus on a solution to the problem introduced by the combined use of prismatic and revolute joints (a common occurrence in practical mobile manipulators) which makes the dimensions of the joint displacement vector components non-homogeneous. Successful applications to the motion planning of several large-payload mobile manipulators with up to 11 d.o.f. are discussed. Sample trajectories involving combined motions of the platform and manipulator under the time-varying occurrence of obstacle and joint limit constraints are presented to illustrate the use and efficiency of the FSP approach in complex motion planning problems.

  20. A global approach to kinematic path planning to robots with holonomic and nonholonomic constraints

    NASA Technical Reports Server (NTRS)

    Divelbiss, Adam; Seereeram, Sanjeev; Wen, John T.

    1993-01-01

    Robots in applications may be subject to holonomic or nonholonomic constraints. Examples of holonomic constraints include a manipulator constrained through the contact with the environment, e.g., inserting a part, turning a crank, etc., and multiple manipulators constrained through a common payload. Examples of nonholonomic constraints include no-slip constraints on mobile robot wheels, local normal rotation constraints for soft finger and rolling contacts in grasping, and conservation of angular momentum of in-orbit space robots. The above examples all involve equality constraints; in applications, there are usually additional inequality constraints such as robot joint limits, self collision and environment collision avoidance constraints, steering angle constraints in mobile robots, etc. The problem of finding a kinematically feasible path that satisfies a given set of holonomic and nonholonomic constraints, of both equality and inequality types is addressed. The path planning problem is first posed as a finite time nonlinear control problem. This problem is subsequently transformed to a static root finding problem in an augmented space which can then be iteratively solved. The algorithm has shown promising results in planning feasible paths for redundant arms satisfying Cartesian path following and goal endpoint specifications, and mobile vehicles with multiple trailers. In contrast to local approaches, this algorithm is less prone to problems such as singularities and local minima.