  1. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  2. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  3. Business System Planning Project, Preliminary System Design

    SciTech Connect

    EVOSEVICH, S.

    2000-10-30

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time.

  4. Business System Planning Project System Requirements Specification

    SciTech Connect

    NELSON, R.E.

    2000-09-08

    The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

  5. Business System Planning Project, Alternatives Analysis

    SciTech Connect

    EVOSEVICH, S.

    2000-10-30

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files.

  6. Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan

    SciTech Connect

    Not Available

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

  7. FY95 software project management plan: TMACS, CASS computer systems

    SciTech Connect

    Spurling, D.G.

    1994-11-11

    The FY95 Work Plan for TMACS and CASS Software Projects describes the activities planned for the current fiscal year. This plan replaces WHC-SD-WM-SDP-008. The TMACS project schedule is included in the TWRS Integrated Schedule.

  8. Automated Procurement System (APS) revised project management plan (DS-03)

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  9. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    SciTech Connect

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  10. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect

    Field, S. M.

    2007-04-01

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  11. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  12. 324 Building liquid waste handling and removal system project plan

    SciTech Connect

    Ham, J.E.

    1998-07-29

    This report evaluates the modification options for handling radiological liquid waste generated during decontamination and cleanout of the 324 Building. Recent discussions indicate that the Hanford site railroad system will be closed by the end of FY 1998 necessitating the need for an alternate transfer method. The issue of handling of Radioactive Liquid Waste (RLW) from the 324 Building (assuming the 340 Facility is not available to accept the RLW) has been examined in at least two earlier engineering studies (Parsons 1997a and Hobart 1997). Each study identified a similar preferred alternative that included modifying the 324 Building RLWS to allow load-out of wastewater to a truck tanker, while making maximum use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes to the building. This alternative is accepted as the basis for further discussion presented in this study. The goal of this engineering study is to verify the path forward presented in the previous studies and assure that the selected alternative satisfies the 324 Building deactivation goals and objectives as currently described in the project management plan. This study will also evaluate options available to implement the preferred alternative and select the preferred option for implementation of the entire system. Items requiring further examination will also be identified. Finally, the study will provide a conceptual design, schedule and cost estimate for the required modifications to the 324 Building to allow removal of RLW. Attachment 5 is an excerpt from the project baseline schedule found in the Project Management Plan.

  13. Manpower and project planning

    NASA Technical Reports Server (NTRS)

    Johnson, David W.

    1991-01-01

    The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

  14. Solid waste information and tracking system server conversion project management plan

    SciTech Connect

    MAY, D.L.

    1999-04-12

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  15. Tank waste remediation system privatization phase 1 infrastructure project W-519, project execution plan

    SciTech Connect

    Parazin, R.J.

    1998-08-28

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented.

  16. Metis Hub: The Development of an Intuitive Project Planning System

    SciTech Connect

    McConnell, Rachael M.

    2015-08-26

    The goal is to develop an intuitive, dynamic, and consistent interface for the Metis Planning System by combining user requirements and human engineering concepts. The system is largely based upon existing systems so some tools already have working models that we can follow. However, the web-based interface is completely new.

  17. Initial single shell tank retrieval system project system engineering management plan

    SciTech Connect

    Krieg, S.A., Westinghouse Hanford

    1996-07-31

    This System Engineering Management Plan (SEMP) describes the Systems Engineering approach that will be used to manage the retrieval of waste from the first single shell tank farm using past practice sluicing techniques. This Project SEMP is used to supplement the requirements of the TWRS SEMP, WHC-SD-WM-SEMP-002.

  18. Project Planning and Reporting

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.

  19. Project W-314 Specific Test and Evaluation Plan for 200E Waste Transfer System

    SciTech Connect

    HAMMERS, J.S.

    2000-02-25

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of the newly constructed 200E Waste Transfer System in the W-314 Project. The STEP provides the outline for test and evaluation methods that verify the system's performance and compliance to the established Project design criteria. The STEP is a ''lower tier'' document based on the W-314 Test & Evaluation Plan (TEP).

  20. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect

    VAN BEEK, J.E.

    1999-09-02

    Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AP-108, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the Privatized waste processing plant and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump based retrieval system for any DST. This Project Management Plan (PMP) documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering.

  1. Project W-151 Tank 101-AZ Waste Retrieval System Year 2000 Compliance Assessment Project Plan

    SciTech Connect

    BUSSELL, J.H.

    1999-08-02

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K compliance for Project W-151, Tank 101-AZ Waste Retrieval System. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. Two mixer pumps and instrumentation have been or are planned to be installed in waste tank 101-AZ to demonstrate solids mobilization. The information and experience gained during this process test will provide data for comparison with sludge mobilization prediction models and provide indication of the effects of mixer pump operation on an Aging Waste Facility tank. A limited description of system dates, functions, interfaces, potential Y2K problems, and date resolutions is presented. The project is presently on hold, and definitive design and procurement have been completed. This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems.

  2. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    SciTech Connect

    RIECK, C.A.

    1999-02-23

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.

  3. Design and implementation of a financial planning and tracking system for the Nova Project

    SciTech Connect

    Holcomb, F.

    1982-01-01

    The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation.

  4. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    SciTech Connect

    Wecks, M.D.

    1998-04-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  5. Developmental Facilitation: Helping Teams Promote Systems Change. Collaborative Planning Project for Planning Comprehensive Early Childhood Systems.

    ERIC Educational Resources Information Center

    Hayden, Peggy; Frederick, Linda; Smith, Barbara J.; Broudy, Alison

    This document provides information on how internal or external facilitators can support early intervention teams in promoting meaningful change in their communities. The information presented is derived from a federally funded project that provided training and technical assistance to local early intervention interagency teams. The project's…

  6. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    SciTech Connect

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  7. Case-Exercises, Diagnosis, and Explanations in a Knowledge Based Tutoring System for Project Planning.

    ERIC Educational Resources Information Center

    Pulz, Michael; Lusti, Markus

    PROJECTTUTOR is an intelligent tutoring system that enhances conventional classroom instruction by teaching problem solving in project planning. The domain knowledge covered by the expert module is divided into three functions. Structural analysis, identifies the activities that make up the project, time analysis, computes the earliest and latest…

  8. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    SciTech Connect

    SPENCER, S.G.

    1999-04-26

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates.

  9. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  10. A scientific operations plan for the NASA space telescope. [ground support systems, project planning

    NASA Technical Reports Server (NTRS)

    West, D. K.; Costa, S. R.

    1975-01-01

    A ground system is described which is compatible with the operational requirements of the space telescope. The goal of the ground system is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of space telescope science, or jeopardizing the safety of the space telescope in orbit. The resulting system is able to accomplish this goal through optimum use of existing and planned resources and institutional facilities. Cost is also reduced and efficiency in operation increased by drawing on existing experience in interfacing guest astronomers with spacecraft as well as mission control experience obtained in the operation of present astronomical spacecraft.

  11. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    SciTech Connect

    BUSSELL, J.H.

    1999-08-25

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems.

  12. HybridPlan: A Capacity Planning Technique for Projecting Storage Requirements in Hybrid Storage Systems

    SciTech Connect

    Kim, Youngjae; Gupta, Aayush; Urgaonkar, Bhuvan; Piotr, Berman; Sivasubramaniam, Anand

    2014-01-01

    Economic forces, driven by the desire to introduce flash into the high-end storage market without changing existing software-base, have resulted in the emergence of solid-state drives (SSDs), flash packaged in HDD form factors and capable of working with device drivers and I/O buses designed for HDDs. Unlike the use of DRAM for caching or buffering, however, certain idiosyncrasies of NAND Flash-based solid-state drives (SSDs) make their integration into hard disk drive (HDD)-based storage systems nontrivial. Flash memory suffers from limits on its reliability, is an order of magnitude more expensive than the magnetic hard disk drives (HDDs), and can sometimes be as slow as the HDD (due to excessive garbage collection (GC) induced by high intensity of random writes). Given the complementary properties of HDDs and SSDs in terms of cost, performance, and lifetime, the current consensus among several storage experts is to view SSDs not as a replacement for HDD, but rather as a complementary device within the high-performance storage hierarchy. Thus, we design and evaluate such a hybrid storage system with HybridPlan that is an improved capacity planning technique to administrators with the overall goal of operating within cost-budgets. HybridPlan is able to find the most cost-effective hybrid storage configuration with different types of SSDs and HDDs

  13. Project: Zero Reject. A System for Locating and Planning for Unserved Handicapped Children.

    ERIC Educational Resources Information Center

    Turner, Ruth

    A project was proposed to develop a system for the location of unserved handicapped students (3 to 21 years old) and a model for facilitating cooperative planning between the Dallas Independent School District and a major community agency. Efforts to ensure the continuation of these activities included the development of a computerized information…

  14. The Collaborative Planning Outreach Project: Building Comprehensive Early Childhood Systems. Final Report.

    ERIC Educational Resources Information Center

    Smith, Barbara J.

    This final report describes the objectives, activities and outcomes of a federally funded initiative to train and assist early childhood interagency teams in a model of planning systems and services for all young children, including children with disabilities and other special needs. The project is based on the value of stakeholder ownership in…

  15. Project Management Plan

    SciTech Connect

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  16. Waste receiving and processing facility module 1 data management system software project management plan

    SciTech Connect

    Clark, R.E.

    1994-11-02

    This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.

  17. Projecting technology change to improve space technology planning and systems management

    NASA Astrophysics Data System (ADS)

    Walk, Steven Robert

    2011-04-01

    Projecting technology performance evolution has been improving over the years. Reliable quantitative forecasting methods have been developed that project the growth, diffusion, and performance of technology in time, including projecting technology substitutions, saturation levels, and performance improvements. These forecasts can be applied at the early stages of space technology planning to better predict available future technology performance, assure the successful selection of technology, and improve technology systems management strategy. Often what is published as a technology forecast is simply scenario planning, usually made by extrapolating current trends into the future, with perhaps some subjective insight added. Typically, the accuracy of such predictions falls rapidly with distance in time. Quantitative technology forecasting (QTF), on the other hand, includes the study of historic data to identify one of or a combination of several recognized universal technology diffusion or substitution patterns. In the same manner that quantitative models of physical phenomena provide excellent predictions of system behavior, so do QTF models provide reliable technological performance trajectories. In practice, a quantitative technology forecast is completed to ascertain with confidence when the projected performance of a technology or system of technologies will occur. Such projections provide reliable time-referenced information when considering cost and performance trade-offs in maintaining, replacing, or migrating a technology, component, or system. This paper introduces various quantitative technology forecasting techniques and illustrates their practical application in space technology and technology systems management.

  18. HANDI 2000 project execution plan

    SciTech Connect

    BENNION, S.I.

    1999-09-09

    The HANDI 2000 project will meet some of the major objectives and goals of the PHMC Management and Integration Plan, HNF-MP-00, Rev. 11, by integrating the major Hanford business processes and their supporting information systems.

  19. Quality Assurance Project Plan

    SciTech Connect

    Holland, R. C.

    1998-06-01

    This Quality Assurance Project Plan documents the quality assurance activities for the Wastewater/Stormwater/Groundwater and Environmental Surveillance Programs. This QAPP was prepared in accordance with DOE guidance on compliance with 10CFR830.120.

  20. DAF Glovebox Project Plan

    SciTech Connect

    Martinez, M.W.; Higgs, R.L.

    2000-11-14

    This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

  1. Tank waste remediation system privatization phase I infrastructure and project W-519 and QA implementation plan

    SciTech Connect

    HUSTON, J.J.

    1999-08-19

    This document has been prepared to identify the quality requirements for all products/activities developed by or for Project W-519. This plan is responsive to the Numatec Hanford Corporation, Quality Assurance Program Plan, NHC-MP-001.

  2. Solid Waste Information and Tracking System Client Server Conversion Project Management Plan

    SciTech Connect

    GLASSCOCK, J.A.

    2000-02-10

    The Project Management Plan governing the conversion of SWITS to a client-server architecture. The PMP describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion

  3. Waste minimization plan construction and operation of the replacement cross-site transfer system, project W-058

    SciTech Connect

    Boucher, T.D.

    1996-04-01

    This report addresses the research and development of a waste minimization plan for the construction and operation of Project W-058, Replacement of the Cross-Site Transfer System, on the Hanford Site. The plan is based on Washington Administrative Code (WAC) 173-307, Plans. The waste minimization plan identifies areas where pollution prevention/waste minimization principles can be incorporated into the construction and operation of the cross-site transfer system.

  4. Planning Complex Projects Automatically

    NASA Technical Reports Server (NTRS)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  5. Spent Nuclear Fuel project, project management plan

    SciTech Connect

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  6. Airspace Systems Program: Next Generation Air Transportation System Concepts and Technology Development FY2010 Project Plan Version 3.0

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal H.

    2010-01-01

    This document describes the FY2010 plan for the management and execution of the Next Generation Air Transportation System (NextGen) Concepts and Technology Development (CTD) Project. The document was developed in response to guidance from the Airspace Systems Program (ASP), as approved by the Associate Administrator of the Aeronautics Research Mission Directorate (ARMD), and from guidelines in the Airspace Systems Program Plan. Congress established the multi-agency Joint Planning and Development Office (JPDO) in 2003 to develop a vision for the 2025 Next Generation Air Transportation System (NextGen) and to define the research required to enable it. NASA is one of seven agency partners contributing to the effort. Accordingly, NASA's ARMD realigned the Airspace Systems Program in 2007 to "directly address the fundamental research needs of the Next Generation Air Transportation System...in partnership with the member agencies of the JPDO." The Program subsequently established two new projects to meet this objective: the NextGen-Airspace Project and the NextGen-Airportal Project. Together, the projects will also focus NASA s technical expertise and world-class facilities to address the question of where, when, how and the extent to which automation can be applied to moving aircraft safely and efficiently through the NAS and technologies that address optimal allocation of ground and air technologies necessary for NextGen. Additionally, the roles and responsibilities of humans and automation influence in the NAS will be addressed by both projects. Foundational concept and technology research and development begun under the NextGen-Airspace and NextGen-Airportal projects will continue. There will be no change in NASA Research Announcement (NRA) strategy, nor will there be any change to NASA interfaces with the JPDO, Federal Aviation Administration (FAA), Research Transition Teams (RTTs), or other stakeholders

  7. A planning support system to optimize approval of private housing development projects

    NASA Astrophysics Data System (ADS)

    Hussnain, M. Q.; Wakil, K.; Waheed, A.; Tahir, A.

    2016-06-01

    Out of 182 million population of Pakistan, 38% reside in urban areas having an average growth rate of 1.6%, raising the urban housing demand significantly. Poor state response to fulfil the housing needs has resulted in a mushroom growth of private housing schemes (PHS) over the years. Consequently, only in five major cities of Punjab, there are 383 legal and 150 illegal private housing development projects against 120 public sector housing schemes. A major factor behind the cancerous growth of unapproved PHS is the prolonged and delayed approval process in concerned approval authorities requiring 13 months on average. Currently, manual and paper-based approaches are used for vetting and for granting the permission which is highly subjective and non-transparent. This study aims to design a flexible planning support system (PSS) to optimize the vetting process of PHS projects under any development authority in Pakistan by reducing time and cost required for site and documents investigations. Relying on the review of regulatory documents and interviews with professional planners and land developers, this study describes the structure of a PSS developed using open- source geo-spatial tools such as OpenGeo Suite, PHP, and PostgreSQL. It highlights the development of a Knowledge Module (based on regulatory documents) containing equations related to scheme type, size (area), location, access road, components of layout plan, planning standards and other related approval checks. Furthermore, it presents the architecture of the database module and system data requirements categorized as base datasets (built-in part of PSS) and input datasets (related to the housing project under approval). It is practically demonstrated that developing a customized PSS to optimize PHS approval process in Pakistan is achievable with geospatial technology. With the provision of such a system, the approval process for private housing schemes not only becomes quicker and user-friendly but also

  8. Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

  9. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    SciTech Connect

    SHOOP, D.S.

    1999-09-10

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment.

  10. Planning for Project Continuation.

    ERIC Educational Resources Information Center

    Berry, Grant, Jr.

    Designed to help colleges plan for the successful continuation of educational improvement projects beyond the end of their original funding period, this report presents a case study of Pennsylvania College of Technology's (PCT's) efforts to ensure the continuation of a Title III faculty development program. After describing the the Title III…

  11. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  12. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 10: PEP project plan

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.

  13. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project - Gen-4 and Gen-5 Radio Plans

    NASA Technical Reports Server (NTRS)

    Griner, James H.

    2014-01-01

    NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current plans for the prototype radio development.

  14. Project plan hydrogen energy systems technology. Phase 1: Hydrogen energy systems technology study

    NASA Technical Reports Server (NTRS)

    1974-01-01

    An overview of the potential need for hydrogen as a source of energy in the future was presented in order to identify and define the technology requirements for the most promising approaches to meet that need. The following study objectives were discussed: (1) determination of the future demand for hydrogen, based on current trends and anticipated new uses, (2) identification of the critical research and technology advances required to meet this need considering, to the extent possible, raw material limitations, economics, and environmental effects, and (3) definition and recommendation of the scope and space of a National Hydrogen Energy Systems Technology Program and outline of a Program Development Plan.

  15. Preventing Elder Abuse: The Texas Plan for a Coordinated Service Delivery System. Collaborative Elder Abuse Prevention Project.

    ERIC Educational Resources Information Center

    McDaniel, Garry L.

    The Texas Department of Human Services, in collaboration with 13 other public and private organizations, co-sponsored a statewide Collaborative Elder Abuse Prevention project. The goal of this project is to develop a comprehensive, long-range plan for the prevention of elder abuse, a method for achieving a coordinated service delivery system for…

  16. QUEST2: Project plan for preliminary analysis/system architecture phase (PA/SA)

    SciTech Connect

    Braaten, F.D.

    1995-03-08

    This Project Management Plan combines the project management deliverables from the P+ methodology that are applicable to this part of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19.

  17. Planning a Multimedia Documentation Project.

    ERIC Educational Resources Information Center

    Rockley, Ann

    1994-01-01

    Outlines the process of planning and developing a multimedia documentation project. Discusses audience, task, and information analysis; selection of the most appropriate media; effective design; establishment of the development team; hardware and software requirements; costs; and project planning. (SR)

  18. Permitting plan for project W-320 tank 241-C-106 waste retrievalsluicing system (WRSS)

    SciTech Connect

    Symons, G.A.

    1997-02-21

    This document describes the permitting plan for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). A comprehensive review of environmental regulations have indicated that several environmental reviews [e.g. National Environmental Policy Act (NEPA), State Environmental Policy Act (SEPA)], permits, and approvals are required prior to construction or operation of the facility. The environmental reviews, permits and approvals, as well the regulatory authority, potentially applicable to the Tank 241-C-106 WRSS include the following: for NEPA - U.S. Department of Energy-Headquarters: Action Description Memorandum, Environmental Assessment, Categorical Exclusion, and Environmental Impact Statement; and for SEPA - State of Washington Department of Ecology (Ecology) Determination of Nonsignificance, Mitigated Determination of Nonsignificance, Determination of Significance, and SEPA Environmental Checklist.

  19. Project Execution Plan, Rev. 3

    SciTech Connect

    IT Corporation, Las Vegas

    2002-08-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls.

  20. Manned orbital systems concepts study. Book 3: Configurations for extended duration missions. [mission planning and project planning for space missions

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Mission planning, systems analysis, and design concepts for the Space Shuttle/Spacelab system for extended manned operations are described. Topics discussed are: (1) payloads, (2) spacecraft docking, (3) structural design criteria, (4) life support systems, (5) power supplies, and (6) the role of man in long duration orbital operations. Also discussed are the assembling of large structures in space. Engineering drawings are included.

  1. Project resources planning and control

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1984-01-01

    This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.

  2. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  3. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  4. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  5. Advanced Life Support Project Plan

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Life support systems are an enabling technology and have become integral to the success of living and working in space. As NASA embarks on human exploration and development of space to open the space frontier by exploring, using and enabling the development of space and to expand the human experience into the far reaches of space, it becomes imperative, for considerations of safety, cost, and crew health, to minimize consumables and increase the autonomy of the life support system. Utilizing advanced life support technologies increases this autonomy by reducing mass, power, and volume necessary for human support, thus permitting larger payload allocations for science and exploration. Two basic classes of life support systems must be developed, those directed toward applications on transportation/habitation vehicles (e.g., Space Shuttle, International Space Station (ISS), next generation launch vehicles, crew-tended stations/observatories, planetary transit spacecraft, etc.) and those directed toward applications on the planetary surfaces (e.g., lunar or Martian landing spacecraft, planetary habitats and facilities, etc.). In general, it can be viewed as those systems compatible with microgravity and those compatible with hypogravity environments. Part B of the Appendix defines the technology development 'Roadmap' to be followed in providing the necessary systems for these missions. The purpose of this Project Plan is to define the Project objectives, Project-level requirements, the management organizations responsible for the Project throughout its life cycle, and Project-level resources, schedules and controls.

  6. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    SciTech Connect

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  7. Project specific quality assurance plan, W-151, Tank 241-AZ-101 waste retrieval system. Revision 2

    SciTech Connect

    Manthei, M.E.

    1994-11-21

    This project specific quality assurance program plan establishes the responsibility for the implementation of QA requirements, defines and documents the QA requirements associated with design, procurement, and construction, and defines and documents the degree of QA reviews and verifications on the design and construction necessary to assure compliance to project and DOE requirements. Revision 2 updates the QAPP to provide concurrence with approved work scope deletion. In addition, the Quality Assurance Program Index is being updated to reflect the current Quality Assurance Program requirements per DOE Order 5700.6C.

  8. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  9. Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms

    ERIC Educational Resources Information Center

    Zeng, Yajun

    2010-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…

  10. External tank project new technology plan. [development of space shuttle external tank system

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A production plan for the space shuttle external tank configuration is presented. The subjects discussed are: (1) the thermal protection system, (2) thermal coating application techniques, (3) manufacturing and tooling, (4) propulsion system configurations and components, (5) low temperature rotating and sliding joint seals, (6) lightning protection, and (7) nondestructive testing technology.

  11. Neste plans three projects

    SciTech Connect

    Not Available

    1993-02-03

    Neste Chemicals (Helsinki) is discussing three joint ventures with local authorities in China, says Mikko Haapavaara, v.p./Asia. The projects should help the Finnish producer to increase sales in Asia by a considerable amount by 2000, he says. The plan involves production of polyethylene (PE), unsaturated polyester resins and PE compounding-all core operations. Sites have not been selected, but Shanghai is the favored location for the PE operations. The company is also looking at a site in the south, near Hong Kong, and at locations near Beijing. The PE plant would need to be near an ethylene unit, says Haapavaara. The PE resin plant would be designed to produce about 150,000 m.t./year and would cost about No. 150 million. A part of the output would need to be exported to take care of the financing, the company says. A feasibility study now under way with the potential Chinese partners should be completed by the end of March. The plant would use Neste's linear low-density PE process, proved in a world-scale plant at Beringen, Belgium. The compounding units would produce specialty PE material for the wire and cable and pipe industry. The company is a joint venture partner in a propane dehydrogenation/polypropylene (PP) plant and a minority partner in a Qualipoly, the 20,000 m.t./year unsaturated polyester resin producer.

  12. Systems engineering management plans.

    SciTech Connect

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  13. DIGITAL ARCHITECTURE PROJECT PLAN

    SciTech Connect

    Thomas, Ken

    2014-09-01

    The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: • There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. • There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. • There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new

  14. A systems analysis and project management plan for the Petite Amateur Navy Satellite (PANSAT)

    NASA Astrophysics Data System (ADS)

    Rich, Markham K.

    1994-09-01

    The Petite Amateur Navy Satellite (PANSAT) is a communications satellite being developed at the Naval Postgraduate School by the Space Systems Academic Group. This thesis is the result of an investigation into all aspects of the project. Research, analyses, and recommendations were concentrated in the areas of engineering design, testing, orbital operations, and organization and management. The study identified the upcoming Shuttle to Mir flights as providing the most attractive orbital parameters for PANSAT operations. A systems analysis was conducted that attempted to develop and prioritize engineering design issues requiring more thorough investigation. The chief problem area discovered by this analysis was in the power production aspect of the Electrical Power System (EPS). PANSAT was determined to have a negative power margin under certain conditions, and an even lower power margin than previously believed under most conditions. It is recommended that the project make satellite development its principal objective (over education) to maximize the likelihood of success. Student participation in the project is the single greatest asset of the project, and it remains largely untapped. Reorganizing the project to increase student involvement, within the constraints of the Space Systems curricula, will improve efficiency by easing extraneous requirements on an over-tasked engineering staff, and thereby improve overall productivity.

  15. Software Configuration Management Plan for the K West Basin Integrated Water Treatment System (IWTS) Project A.9

    SciTech Connect

    GREEN, J.W.

    2000-05-01

    This document provides a configuration control plan for the software associated with the operation and control of the Integrated Water Treatment System (IWTS). It establishes requirements for ensuring configuration item identification, configuration control, configuration status accounting, defect reporting and resolution of computer software. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998) and HNF-PRO-309 Computer Software Quality Assurance Requirements, and applicable sections of administrative procedure CM-6-037-00, SNF Project Process Automation Software and Equipment.

  16. PMIS: System Description. PMIS Project. Planning & Management Information System. A Project To Develop a Data Processing System for Support of the Planning and Management Needs of Local School Districts.

    ERIC Educational Resources Information Center

    Council of the Great City Schools, Washington, DC.

    PMIS (Planning and Management Information System) is an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time, interactive data management system for strategic planning;…

  17. Project Surveillance and Maintenance Plan. [UMTRA Project

    SciTech Connect

    Not Available

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

  18. Project W-320 ALARA Plan

    SciTech Connect

    Harty, W.M.

    1995-06-06

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials.

  19. PLANNING QUALITY IN GEOSPATIAL PROJECTS

    EPA Science Inventory

    This presentation will briefly review some legal drivers and present a structure for the writing of geospatial Quality Assurance Projects Plans. In addition, the Geospatial Quality Council geospatial information life-cycle and sources of error flowchart will be reviewed.

  20. Public Information Plan. [UMTRA Project

    SciTech Connect

    Not Available

    1984-06-01

    The Public Information Plan is intended to be used in conjunction with the DOE-UMTRA Project Public Participation Plan'' to describe the Department of Energy's plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control of Act of 1978, PL95-604. The Act provides for a cooperative effort with affected states and Indian tribes for the cleanup of designated abandoned or inactive uranium mill tailings sites. The objective of the Public Information Plan of the UMTRA Project is timely and sufficient dissemination of factual information to promote understanding of the project by federal, state, and local officials, the media, special interest groups, and the general public; and thereby to encourage informed participation in the project by the public and government officials. The Uranium Mill Tailings Radiation Control Act provides for public involvement in remedial action planning, with special consideration given to landowners, Indian tribes, and the states. According to the Act, the Secretary of Energy shall hold public hearings in the states where processing sites, vicinity properties, and disposal sites are located. Public participation in the UMTRA Project will not, however, be limited to those mechanisms formally required by law. The public may also be involved informally through informational meetings, workshops, and local citizens' task forces. 12 refs., 2 figs., 1 tab.

  1. SNF project engineering process improvement plan

    SciTech Connect

    KELMENSON, R.L.

    1999-05-24

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999.

  2. ART/Ada design project, phase 1: Project plan

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.

    1988-01-01

    The plan and schedule for Phase 1 of the Ada based ESBT Design Research Project is described. The main platform for the project is a DEC Ada compiler on VAX mini-computers and VAXstations running the Virtual Memory System (VMS) operating system. The Ada effort and lines of code are given in tabular form. A chart is given of the entire project life cycle.

  3. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  4. OAST system technology planning

    NASA Technical Reports Server (NTRS)

    Sadin, S. R.

    1978-01-01

    The NASA Office of Aeronautics and Space Technology developed a planning model for space technology consisting of a space systems technology model, technology forecasts and technology surveys. The technology model describes candidate space missions through the year 2000 and identifies their technology requirements. The technology surveys and technology forecasts provide, respectively, data on the current status and estimates of the projected status of relevant technologies. These tools are used to further the understanding of the activities and resources required to ensure the timely development of technological capabilities. Technology forecasting in the areas of information systems, spacecraft systems, transportation systems, and power systems are discussed.

  5. Tasks, Tips and Tools for Promoting Collaborative Community Teams. Collaborative Planning Project for Planning Comprehensive Early Childhood Systems.

    ERIC Educational Resources Information Center

    Hayden, Peggy; Frederick, Linda; Smith, Barbara J.; Broudy, Alison

    This document provides information on tasks, tips, and tools derived from a federally funded project that provided training and technical assistance to local early intervention interagency teams. The project's purpose was to facilitate the establishment of local collaborative teams to work on challenges associated with putting in place a long-term…

  6. System definition phase and acquisition phase project plan for Small Astronomy Satellite SAS-D

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The objective of the SAS-D project is to conduct spectral distribution studies of celestial ultraviolet sources using an Explorer-class spacecraft launched by a Delta vehicle into a geosynchronous orbit in the last half of 1975. The telescope system is intended for use by guest astronomers for a major portion of the total observing time. The concept of the overall system, designed to resemble functionally the operation of a ground-based observatory, should maximize the usefulness of the instrument to the astronomical community by limiting the amount of special instruction needed to use the spaceborne telescope. The SAS-D mission will obtain information on what stars, nebulae, and galaxies are and how they develop.

  7. Optics Supply Planning System

    SciTech Connect

    Gaylord, J

    2009-04-30

    The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system

  8. Project Execution Plan

    SciTech Connect

    DOE /NV

    1999-03-22

    Created in 1989 to address over 50 years of environmental liabilities arising out of nuclear weapons production and testing in the United States since World War II, the U.S. Department of Energy's (DOE's) Environmental Management (EM) Programs decade-long effort to reduce the costs of those environmental liabilities, collectively known as DOE's ''environmental mortgage,'' includes past as well as future cleanup costs associated with environmental contamination, hazardous and radioactive materials and wastes, contaminated buildings and facilities, and their associated risks. Tasked with the bulk of these cleanup efforts, the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's), Nevada Environmental Restoration Project (NV ERP) is attempting to complete applicable corrective actions at inactive contaminated sites and facilities managed by DOE/NV, while at the same time protecting human health and the environment. Regulated under the Federal Facility Agreement and Consent Order, the objectives of the NV ERP are to identify the nature and extent of the contamination, determine its potential risk to the public and the environment, and to perform the necessary corrective actions in compliance with this and other state and federal regulations, guidelines, and requirements. Associated with this vast effort are approximately 2,000 sites both on and off of the Nevada Test Site (NTS) that were used primarily for nuclear testing and are addressed in the NV ERP. This includes sites that were underground areas where tests were actually conducted, contaminated surface soils resulting from aboveground testing activities, and sites that supported other related testing hardware paraphenalia and/or NTS real estate properties (e.g., underground storage tanks, leachfields, landfills, contaminated waste areas, injection wells, muckpiles, and ponds). To assist in this effort, a NV ERP Team was assembled which is composed of organizations from both the public and private

  9. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect

    POWELL, P.A.

    2000-03-29

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  10. Project Plan Remote Target Fabrication Refurbishment Project

    SciTech Connect

    Bell, Gary L; Taylor, Robin D

    2009-08-01

    authorization for the work was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

  11. Airspace Systems Program: Next Generation Air Transportation System, NextGen Systems Analysis, Integration and Evaluation Project. Version 1.0; Project Plan

    NASA Technical Reports Server (NTRS)

    Quon, Leighton

    2010-01-01

    The key objectives of the NASA ASP are to: Improve mobility, capacity efficiency and access of the airspace system. Improve collaboration, predictability, and flexibility for the airspace users. Enable accurate modeling and simulation of air transportation systems. Accommodate operations of all classes of aircraft. Maintain system safety and environmental protection. In support of these program objectives, the major goal of the NextGen-SAIE Project is to enable the transition of key capacity and efficiency improvements to the NAS. Since many aspects of the NAS are unique to specific airport or airspace environments, demand on various parts of the NAS is not expected to increase equally as system demand grows. SAIE will provide systems level analysis of the NAS characteristics, constraints, and demands such that a suite of capacity-increasing concepts and technologies for system solutions are enabled and facilitated. The technical objectives in support of this goal are the following: Integration, evaluation, and transition of more mature concepts and technologies in an environment that faithfully emulates real-world complexities. Interoperability research and analysis of ASP technologies across ATM functions is performed to facilitate integration and take ASP concepts and technologies to higher Technology Readiness Level (TRL). Analyses are conducted on the program s concepts to identify the system benefits or impacts. System level analysis is conducted to increase understanding of the characteristics and constraints of airspace system and its domains.

  12. Nascom System Development Plan: System Description, Capabilities and Plans

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The NASA Communications (Nascom) System Development Plan (NSDP), reissued annually, describes the organization of Nascom, how it obtains communication services, its current systems, its relationship with other NASA centers and International Partner Agencies, some major spaceflight projects which generate significant operational communication support requirements, and major Nascom projects in various stages of development or implementation.

  13. AVLIS Production Plant Project Management Plan

    SciTech Connect

    Not Available

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  14. Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

    NASA Technical Reports Server (NTRS)

    Mckay, Charles

    1991-01-01

    This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

  15. Integrated Project Management System description. [UMTRAP Project

    SciTech Connect

    Not Available

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office ( Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs.

  16. SNF Project Engineering Process Improvement Plan

    SciTech Connect

    DESAI, S.P.

    2000-02-09

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities.

  17. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  18. Remote sensing applications for urban planning - The LUMIS project. [Land Use Management Information System

    NASA Technical Reports Server (NTRS)

    Paul, C. K.; Landini, A. J.; Diegert, C.

    1975-01-01

    The Santa Monica mountains of Los Angeles consist primarily of complexly folded sedimentary marine strata with igneous and metamorphic rocks at the eastern end of the mountains. With the increased development of the Santa Monicas, a study was conducted to determine the critical land use data items in the mountains. Two information systems developed in parallel are described. One capitalizes on the City's present computer line printer system, and the second utilizes map overlay techniques on an interactive computer terminal. Results concerning population, housing, and land improvement illustrate the successful linking of ordinal and nominal data files in the interactive system.-

  19. Preliminary design study of advanced composite blade and hub and nonmechanical control system for the tilt-rotor aircraft. Volume 2: Project planning data

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Project planning data for a rotor and control system procurement and testing program for modifications to the XV-15 tilt-rotor research demonstrator aircraft is presented. The design, fabrication, and installation of advanced composite blades compatible with the existing hub, an advanced composite hub, and a nonmechanical control system are required.

  20. Project Management Plan (PMP) for Work Management Implementation

    SciTech Connect

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  1. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    SciTech Connect

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  2. Crustal dynamics project observing plan for highly mobile systems 1981 - 1986

    NASA Technical Reports Server (NTRS)

    Frey, H.

    1980-01-01

    Measurement of crustal motion in the western United States and other tectonically active regions makes use of fixed, movable and highly mobile satellite laser ranging and very long baseline interferometry systems. Measurement of the rotational dynamics of the Earth as well as regional deformation and plate motion are discussed.

  3. Project Plan 7930 Cell G PaR Remote Handling System Replacement

    SciTech Connect

    Kinney, Kathryn A

    2009-10-01

    For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully

  4. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  5. PMIS Project. Planning & Management Information System. A Project To Develop a Data Processing System for Support of the Planning and Management Needs of Local School Districts. Final Report, Year 2.

    ERIC Educational Resources Information Center

    Council of the Great City Schools, Washington, DC.

    This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…

  6. Subjective risk assessment for planning conservation projects

    NASA Astrophysics Data System (ADS)

    Game, Edward T.; Fitzsimons, James A.; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-12-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner.

  7. Early Owner Planning Leads to Project Success

    ERIC Educational Resources Information Center

    Gainsboro, Dan

    2006-01-01

    In the vast majority of building projects, decisions made in the first 10 percent of project activity directly determine 90 percent of the final cost and schedule. When a project is poorly planned, project costs can expand beyond estimates by as much as 50 percent. Since the owner's rate of spending increases as a building project proceeds,…

  8. SAPHIRE 8 Software Project Plan

    SciTech Connect

    Curtis L.Smith; Ted S. Wood

    2010-03-01

    This project is being conducted at the request of the DOE and the NRC. The INL has been requested by the NRC to improve and maintain the Systems Analysis Programs for Hands-on Integrated Reliability Evaluation (SAPHIRE) tool set concurrent with the changing needs of the user community as well as staying current with new technologies. Successful completion will be upon NRC approved release of all software and accompanying documentation in a timely fashion. This project will enhance the SAPHIRE tool set for the user community (NRC, Nuclear Power Plant operations, Probabilistic Risk Analysis (PRA) model developers) by providing improved Common Cause Failure (CCF), External Events, Level 2, and Significance Determination Process (SDP) analysis capabilities. The SAPHIRE development team at the Idaho National Laboratory is responsible for successful completion of this project. The project is under the supervision of Curtis L. Smith, PhD, Technical Lead for the SAPHIRE application. All current capabilities from SAPHIRE version 7 will be maintained in SAPHIRE 8. The following additional capabilities will be incorporated: • Incorporation of SPAR models for the SDP interface. • Improved quality assurance activities for PRA calculations of SAPHIRE Version 8. • Continue the current activities for code maintenance, documentation, and user support for the code.

  9. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

  10. Fast flux test facility, transition project plan

    SciTech Connect

    Guttenberg, S.

    1994-11-15

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  11. Tools for Supporting Distributed Agile Project Planning

    NASA Astrophysics Data System (ADS)

    Wang, Xin; Maurer, Frank; Morgan, Robert; Oliveira, Josyleuda

    Agile project planning plays an important part in agile software development. In distributed settings, project planning is severely impacted by the lack of face-to-face communication and the inability to share paper index cards amongst all meeting participants. To address these issues, several distributed agile planning tools were developed. The tools vary in features, functions and running platforms. In this chapter, we first summarize the requirements for distributed agile planning. Then we give an overview on existing agile planning tools. We also evaluate existing tools based on tool requirements. Finally, we present some practical advices for both designers and users of distributed agile planning tools.

  12. Analysis of offsite emergency planning zones project

    SciTech Connect

    Petrocchi, A.J.; Armstrong, C.E. . Rocky Flats Plant); McKinney, J.M.; Verholek, M.G.; Fraser, P.J.; Dalfonso, P.H. )

    1991-07-18

    The Rocky Flats Plant maintains and uses significant nonradioactive chemically hazardous material (HAZMAT) inventories. Some of these materials are used in sufficient quantities to represent a credible risk to the offsite public in the event of an emergency at the facility. In Phase 2 of this project, the EG G Rocky Flats, Inc. and TENERA, L.P. Task Team (Task Team) produced an initial screening-level modeling analysis study and an Emergency Planning Zone (EPZ) encompassing the Vulnerable Zones (VZs) for hazardous materials stored at the facility. The screening-level analysis will be supplemented with more refined evaluations during subsequent phases of the project. The existence of these chemicals in the Rocky Flats Plant Occupational Health Information System (OHIS) chemical inventory database was verified. All liquid and gaseous chemicals were considered as potential hazardous material source terms for further screening analysis. Hazards associated with solid substances were not considered in this phase of the project. 2 figs., 13 tabs.

  13. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  14. Florida Board of Governors Degree Planning and Projection Model for the State University System. Report of Findings

    ERIC Educational Resources Information Center

    Florida Board of Governors, State University System, 2004

    2004-01-01

    North Highland conducted a six (6) week study with support from the Florida Department of Education, Independent Colleges and Universities of Florida (ICUF), Division of Community Colleges, and the Board of Governors (BOG) to forecast and analyze the State University System's (SUS) plans for degree production through 2013-2014. The primary goal…

  15. UMTRA Project: Environment, Safety, and Health Plan

    SciTech Connect

    Not Available

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project`s ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors` evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations.

  16. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    SciTech Connect

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals.

  17. Yucca Mountain Site Characterization Project Plan

    SciTech Connect

    Gertz, C.P.; Bartlett, J.

    1992-01-01

    The purpose of this document is to describe the Yucca Mountain Site Characterization Project (YMP) and establish an approved YMP baseline against which overall YMP progress and management effectiveness shall be measured. For the sake of brevity, this document will be referred to as the Project Plan throughout this document. This Project Plan only addresses activities up to the submittal of the repository license application (LA) to the Nuclear Regulatory Commission (NRC). A new Project Plan will be submitted to establish the technical, cost, and schedule baselines for the final design and construction phase of development extending through the start of repository operations, assuming that the site is determined to be suitable.

  18. 78 FR 54949 - Major Project Financial Plan Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... TRANSPORTATION Federal Highway Administration Major Project Financial Plan Guidance AGENCY: Federal Highway... Major Project Financial Plan Guidance outlining the procedures the FHWA will follow when reviewing and approving Financial Plans. The proposed Major Project Financial Plan Guidance incorporates changes...

  19. Project X Accelerator R&D Plan

    SciTech Connect

    Not Available

    2008-01-31

    Project X is a high intensity proton facility conceived to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report. Project X is based on an 8 GeV superconducting H-linac, paired with the existing (but modified) Main Injector and Recycler Ring, to provide in excess of 2 MW of beam power throughout the energy range 60-120 GeV, simultaneous with at least 100 kW of beam power at 8 GeV. The linac utilizes technology in common with the ILC over the energy range 0.6-8.0 GeV. Beam current parameters can be made identical to ILC resulting in identical rf generation and distribution systems. This alignment of ILC and Project X technologies allows for a shared development effort. The initial 0.6 GeV of the linac draws heavily on technology developed by Argonne National Laboratory for a facility for rare isotope beams. It is anticipated that the exact configuration and operating parameters of the linac will be defined through the R&D program and will retain alignment with the ILC plan as it evolves over this period. Utilization of the Recycler Ring as an H{sup -} stripper and accumulator ring is the key element that provides the flexibility to operate the linac with the same beam parameters as the ILC. The linac operates at 5 Hz with a total of 5.6 x 10{sup 13} H{sup -} ions delivered per pulse. H{sup -} are stripped at injection into the Recycler in a manner that 'paints' the beam both transversely and longitudinally to reduce space charge forces. Following the 1 ms injection, the orbit moves off the stripping foil and circulates for 200 msec, awaiting the next injection. Following three such injections a total of 1.7 x 10{sup 14} protons are transferred in a single turn to the Main Injector. These protons are then accelerated to 120 GeV and fast extracted to a neutrino target. The Main Injector cycle takes 1.4 seconds

  20. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  1. 54. PLAN OF POWERHOUSE, PROJECT 1933, EXHIBIT F, SANTA ANA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    54. PLAN OF POWERHOUSE, PROJECT 1933, EXHIBIT F, SANTA ANA POWERHOUSE NO. 1. SCE drawing no. 5206855 (no date; FERC no. 1933-45). - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  2. Oak Ridge National Laboratory Facilities Revitalization Project - Project Management Plan

    SciTech Connect

    Myrick, T.E.

    2000-06-06

    The Facilities Revitalization Project (FRP) has been established at Oak Ridge National Laboratory (ORNL) to provide new and/or refurbished research and support facilities for the Laboratory's science mission. The FRP vision is to provide ORNL staff with world-class facilities, consolidated at the X-10 site, with the first phase of construction to be completed within five years. The project will utilize a combination of U.S. Department of Energy (DOE), State of Tennessee, and private-sector funds to accomplish the new construction, with the facilities requirements to be focused on support of the ORNL Institutional Plan. This FRP Project Management Plan has been developed to provide the framework under which the project will be conducted. It is intended that the FRP will be managed as a programmatic office, with primary resources for execution of the project to be obtained from the responsible organizations within ORNL (Engineering, Procurement, Strategic Planning, etc.). The FRP Project Management Plan includes a definition of the project scope, the organizational responsibilities, and project approach, including detailed Work Breakdown Structure (WBS), followed by more detailed discussions of each of the main WBS elements: Project Planning Basis, Facility Deactivation and Consolidation, and New Facilities Development. Finally, a general discussion of the overall project schedule and cost tracking approach is provided.

  3. Uranium Mill Tailings Remedial Action (UMTRA) Surface Project: Project plan. Revision 1

    SciTech Connect

    Not Available

    1993-08-11

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) [Public Law (PL) 95-604, 42 United States Code (USC) 7901], hereinafter referred to as the ``Act,`` authorizes the US Department of Energy (DOE) to stabilize and control surface tailings and ground water contamination. To fulfill this mission, the DOE has established two projects under the Uranium Mill Tailings Remedial Action (UMTRA) Project Office. The Ground Water Project was established in April 1991 as a major project and a separate project plan will be prepared for that portion of the mission. This project plan covers the UMTRA Surface Project, a major system acquisition (MSA).

  4. The telerobot workstation testbed for the shuttle aft flight deck: A project plan for integrating human factors into system design

    NASA Technical Reports Server (NTRS)

    Sauerwein, Timothy

    1989-01-01

    The human factors design process in developing a shuttle orbiter aft flight deck workstation testbed is described. In developing an operator workstation to control various laboratory telerobots, strong elements of human factors engineering and ergonomics are integrated into the design process. The integration of human factors is performed by incorporating user feedback at key stages in the project life-cycle. An operator centered design approach helps insure the system users are working with the system designer in the design and operation of the system. The design methodology is presented along with the results of the design and the solutions regarding human factors design principles.

  5. Demil planning and management system

    SciTech Connect

    Huber, C.C.; Bormet, S.M.; Whitfield, R.G.; Bowen, M.; Chun, K.C.; Golden, R.E.; Fuller, R.

    1997-08-01

    The National Maintenance Point (NMP) Branch of the US Army Industrial Operations Command (IOC) serves as the Single Manager for Conventional Ammunition (SMCA) agent for managing the renovation, modification, recycling, and disposal of conventional ammunition, thereby improving readiness. The mission of the NMP includes program management for demilitarization (demil) activities, ammunition maintenance, and ammunition peculiar equipment (APE) projects. Through an Interagency Agreement between the US Army and the US Department of Energy, Argonne National Laboratory (ANL) is developing an integrated data management system, called the Demil Planning and Management System (DPMS), for IOC. DPMS is intended to help NMP efficiently manage information on ongoing demil project activities and asset inventories, plan future projects, and allocate budgets. This system, when fully implemented, will also make it possible for the user community to interactively access the DPMS database; perform data entry and queries; and run reports through network, modem, and Internet access to the system. This paper describes the principal components of the DPMS, current capabilities, and planned enhancements.

  6. Mission planning for autonomous systems

    NASA Technical Reports Server (NTRS)

    Pearson, G.

    1987-01-01

    Planning is a necessary task for intelligent, adaptive systems operating independently of human controllers. A mission planning system that performs task planning by decomposing a high-level mission objective into subtasks and synthesizing a plan for those tasks at varying levels of abstraction is discussed. Researchers use a blackboard architecture to partition the search space and direct the focus of attention of the planner. Using advanced planning techniques, they can control plan synthesis for the complex planning tasks involved in mission planning.

  7. Conceptual Design Plan SM-43 Replacement Project

    SciTech Connect

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  8. UMTRA Project value engineering plan

    SciTech Connect

    Not Available

    1990-06-01

    The objective of value engineering (VE) on the Uranium MILL Tailings Remedial Action (UMTRA) Project is to ensure that remedial action at the UMTRA Project sites is performed to meet the US Environmental Protection Agency (EPA) standards for inactive uranium mill tailings sites at the lowest cost, while maintaining a high quality of work. Through review of designs and consideration of reasonable, less expensive alternatives, VE can be an effective cost reduction tool and a means to improve the design. The UMTRA Project products are the design and construction of stabilized tailings embankments.

  9. Planning Systems for Distributed Operations

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  10. Safe teleradiology: information assurance as project planning methodology

    NASA Astrophysics Data System (ADS)

    Collmann, Jeff R.; Alaoui, Adil; Nguyen, Dan; Lindisch, David

    2003-05-01

    This project demonstrates use of OCTAVE, an information security risk assessment method, as an approach to the safe design and planning of a teleradiology system. By adopting this approach to project planning, we intended to provide evidence that including information security as an intrinsic component of project planning improves information assurance and that using information assurance as a planning tool produces and improves the general system management plan. Several considerations justify this approach to planning a safe teleradiology system. First, because OCTAVE was designed as a method for retrospectively assessing and proposing enhancements for the security of existing information management systems, it should function well as a guide to prospectively designing and deploying a secure information system such as teleradiology. Second, because OCTAVE provides assessment and planning tools for use primarily by interdisciplinary teams from user organizations, not consultants, it should enhance the ability of such teams at the local level to plan safe information systems. Third, from the perspective of sociological theory, OCTAVE explicitly attempts to enhance organizational conditions identified as necessary to safely manage complex technologies. Approaching information system design from the perspective of information security risk management proactively integrates health information assurance into a project"s core. This contrasts with typical approaches that perceive "security" as a secondary attribute to be "added" after designing the system and with approaches that identify information assurance only with security devices and user training. The perspective of health information assurance embraces so many dimensions of a computerized health information system"s design that one may successfully deploy a method for retrospectively assessing information security risk as a prospective planning tool. From a sociological perspective, this approach enhances the

  11. Life sciences space biology project planning

    NASA Technical Reports Server (NTRS)

    Primeaux, G.; Newkirk, K.; Miller, L.; Lewis, G.; Michaud, R.

    1988-01-01

    The Life Sciences Space Biology (LSSB) research will explore the effect of microgravity on humans, including the physiological, clinical, and sociological implications of space flight and the readaptations upon return to earth. Physiological anomalies from past U.S. space flights will be used in planning the LSSB project.The planning effort integrates science and engineering. Other goals of the LSSB project include the provision of macroscopic view of the earth's biosphere, and the development of spinoff technology for application on earth.

  12. SNF project engineering process improvement plan

    SciTech Connect

    DESAI, S.P.

    1999-07-13

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999.

  13. Guidelines for the Planning Year. Project Trident.

    ERIC Educational Resources Information Center

    Lincoln Community High School, IL.

    A major goal of education should be to prepare every young person leaving school to enter higher education or to enter useful and rewarding work. This is the goal of Project Trident, a comprehensive career education program being developed at Lincoln Community High School, Illinois. The project, in its planning year, is directed toward secondary…

  14. Northeast Regional Education Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Northeast Regional Exchange Steering Committee, Boston, MA.

    Created to facilitate the dissemination of information between researchers and the educational community, the Northeast Regional Exchange steering committee has defined needs, determined agency qualifications, identified priorities, undertaken a series of minigrant projects, and developed plans for the extension of these projects and a study of…

  15. Geothermal energy projects - Planning and management

    SciTech Connect

    Goodman, L.J.; Love, R.N.

    1980-01-01

    A presentation is made of management requirements for the development of geothermal resources by citing three major, and successful, projects: the Wairakei geothermal power project of New Zealand, the Hawaii geothermal project of the United States, and the Tiwi geothermal project of the Philippines. The three case studies are presented according to a format in which the history of each project falls into four phases: (1) planning, appraisal and design (2) section, approval and activation (3) operation, control and handover and (4) evaluation and refinement. Each case study furnishes extensive performance and economic figures, along with consideration of such related issues as geothermal effluent chemical content, infrastructural requirements, and environmental impact.

  16. 11. GENERAL PLAN. Vasona Light Rail Project, Asbuilt Plan, Diridon ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. GENERAL PLAN. Vasona Light Rail Project, As-built Plan, Diridon Station Water Tank. Scale 1:200. Drawing no. SP701, submitted by Biggs Cardoss Associates, Inc., 1871 The Alameda, Suite 200, San Jose, California. Contract no. C326, CADD file 326SP701. Stamped by Roy M. Schnabel, California registered professional engineer no. C46828. - Southern Pacific Depot, Water Tower, 65 Cahill Street, San Jose, Santa Clara County, CA

  17. Project W-420 stack monitoring system upgrades

    SciTech Connect

    CARPENTER, K.E.

    1999-02-25

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420.

  18. National Security Technology Incubation Project Continuation Plan

    SciTech Connect

    2008-09-30

    This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

  19. IAIMS at Columbia: a strategic plan and model project.

    PubMed Central

    Hendrickson, G L; Anderson, R K; Levy, R I

    1986-01-01

    This report describes the Integrated Academic Information Management System (IAIMS) prototype project at the Columbia-Presbyterian Medical Center, the factors that led to the selection of this particular project, and the planning for its implementation. The lessons learned to date and implications for the library are summarized. PMID:3527311

  20. Bantam System Technology Project

    NASA Technical Reports Server (NTRS)

    Moon, J. M.; Beveridge, J. R.

    1998-01-01

    This report focuses on determining a best value, low risk, low cost and highly reliable Data and Command System for support of the launch of low cost vehicles which are to carry small payloads into low earth orbit. The ground-based DCS is considered as a component of the overall ground and flight support system which includes the DCS, flight computer, mission planning system and simulator. Interfaces between the DCS and these other component systems are considered. Consideration is also given to the operational aspects of the mission and of the DCS selected. This project involved: defining requirements, defining an efficient operations concept, defining a DCS architecture which satisfies the requirements and concept, conducting a market survey of commercial and government off-the-shelf DCS candidate systems and rating the candidate systems against the requirements/concept. The primary conclusions are that several low cost, off-the-shelf DCS solutions exist and these can be employed to provide for very low cost operations and low recurring maintenance cost. The primary recommendation is that the DCS design/specification should be integrated within the ground and flight support system design as early as possible to ensure ease of interoperability and efficient allocation of automation functions among the component systems.

  1. Mobile systems capability plan

    SciTech Connect

    1996-09-01

    This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered.

  2. Project Hanford management contract quality improvement project management plan

    SciTech Connect

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  3. Finance and supply management project execution plan

    SciTech Connect

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  4. Energy Strategic Planning & Sufficiency Project

    SciTech Connect

    Retziaff, Greg

    2005-03-30

    This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follows: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

  5. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect

    Burritt, James G.; Berkey, Edgar

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  6. Earth System Science Project

    ERIC Educational Resources Information Center

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  7. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  8. Tank waste remediation system configuration management plan

    SciTech Connect

    Vann, J.M.

    1998-01-08

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

  9. Cesium legacy safety project management work plan

    SciTech Connect

    Durham, J.S.

    1998-04-21

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell).

  10. Guidance and Control Software Project Data - Volume 1: Planning Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  11. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  12. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  13. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  14. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  15. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  16. Breckinridge Project, initial effort. Report VI. Project Management Plan

    SciTech Connect

    1982-01-01

    Report VI presents a comprehensive plan for the management of the Breckinridge Project. For the purpose of this report, the project work is divided into five major project phases: Development, Engineering, Procurement, Construction, and Operations. The results of the Development Phase (Initial Effort) of the project are discussed in Section 1.0. This phase of the project was performed under a Cooperative Agreement with US Department of Energy and has produced 43 volumes of documentation. Fifteen volumes contain information of proprietary nature for patented processes and are therefore classified as Limited Access; however, twenty-eight volumes are not classified and are suitable for public dissemination. This Project Management Plan is a volume of the unclassified documentation. The other twenty-seven volumes contain comprehensive data on technical, financial, and environmental aspects of the project. Each of the four remaining project phases is presented starting with the extensive planning that will be performed and continuing through to the execution and completion of each phase. The major roles of the Operator, Ashland Synthetic Fuels, Inc. (ASFI), and the Managing Contractor are defined. Although a contract has not yet been executed with a Managing Contractor, the procedures, controls, organization and management philosophy of Bechtel Petroleum, Inc., are presented in this report as being representative of those used by contractors in the business of performing the engineering, procurement, and construction of projects of this size and complexity. The organizational structures of the Operator and the Managing Contractor are described, with designation of key project team personnel by job description and organization charts. Provisions for cost, schedule, and material control are described.

  17. Fast Flux Test Facility Closure Project - Project Management Plan

    SciTech Connect

    BEACH, R.R.

    2002-09-26

    The Fast Flux Test Facility (FFTF) Closure Project, Project Management Plan, Revision 5, provides the scope, cost, and schedule to achieve the most cost effective and expeditious closure of the FFTF to an assumed final end-state with the reactor vessel and the containment building, below the 5504 grade level, being entombed in place. Closure will be completed by December 2009 at a cost of $547 million.

  18. UMTRA Project environmental, health, and safety plan

    SciTech Connect

    Not Available

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs.

  19. Spent Nuclear Fuel Project dose management plan

    SciTech Connect

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts.

  20. NEW HAMPSHIRE ESTUARIES PROJECT MANAGEMENT PLAN, 2000

    EPA Science Inventory

    The Comprehensive Conservation and Management Plan of the New Hampshire Estuaries Project presents a broad framework and specific list of actions to protect and enhance the environmental quality of the estuaries of the State of New Hampshire. It is intended to be a guide for all ...

  1. Project "Flashlight" Planning Grant. Final Report.

    ERIC Educational Resources Information Center

    Ehrmann, Stephen C.

    This final report describes results of a planning grant for the "Flashlight" project, an effort to develop, test, and disseminate evaluation procedures that a postsecondary institution or department could use to periodically assess its evolving educational strategies, in particular strategies supported by use of computing, video, and…

  2. National Ignition Facility project acquisition plan

    SciTech Connect

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

  3. NEW HAMPSHIRE ESTUARIES PROJECT MANAGEMENT PLAN

    EPA Science Inventory

    This Comprehensive Conservation and Management Plan of the New Hampshire Estuaries Project presents a broad framework and specific list of actions to protect and enhance the environmental quality of the estuaries of the State of New Hampshire. It is intended to be a guide for all...

  4. Management Information System Project.

    ERIC Educational Resources Information Center

    Foley, Walter J.; Harr, Gordon G.

    The Management Information System (MIS) described in this report represents a plan to utilize modern management techniques to facilitate the goal of a learner-responsive school system. The MIS component is being developed to meet the need for the coordination of the resources of staff, facilities, and time with the long range planning and…

  5. Management and Evaluation Plan for Instructional Systems Development for Vocational-Technical Education. Project ABLE: Development and Evaluation of an Experimental Curriculum for the New Quincy (Mass.) Vocational-Technical School.

    ERIC Educational Resources Information Center

    Ullery, J. William

    Intended to serve as a manual for the developmental and evaluative activities of Project ABLE, this report presents the management and evaluation plan for instructional system development. Major emphasis of the plan is the formation of evaluative procedures drawing on student performance data as the primary source of feedback. To insure continuous…

  6. [Remote radiation planning support system].

    PubMed

    Atsumi, Kazushige; Nakamura, Katsumasa; Yoshidome, Satoshi; Shioyama, Yoshiyuki; Sasaki, Tomonari; Ohga, Saiji; Yoshitake, Tadamasa; Shinoto, Makoto; Asai, Kaori; Sakamoto, Katsumi; Hirakawa, Masakazu; Honda, Hiroshi

    2012-08-01

    We constructed a remote radiation planning support system between Kyushu University Hospital (KUH) in Fukuoka and Kyushu University Beppu Hospital (KBH) in Oita. Between two institutions, radiology information system for radiotherapy division (RT-RIS) and radiation planning system (RTPS) were connected by virtual private network (VPN). This system enables the radiation oncologists at KUH to perform radiotherapy planning for the patients at KBH. The detail of the remote radiation planning support system in our institutions is as follows: The radiation oncologist at KBH performs radiotherapy planning and the data of the patients are sent anonymously to the radiation oncologists at KUH. The radiation oncologists at KUH receive the patient's data, access to RTPS at KBH, verify or change the radiation planning at KBH: Radiation therapy is performed at KBH according to the confirmed plan by the radiation oncologists at KUH. Our remote radiation planning system is useful for providing radiation therapy with safety and accuracy. PMID:23157128

  7. Minimal Technologies Application Project: Planning and installation

    SciTech Connect

    Zellmer, S.D.; Hinchman, R.R.; Severinghaus, W.D.; Johnson, D.O.; Brent, J.J.

    1989-03-01

    Intensive and continuous tactical training during the last 35 years at the Hohenfels Training Area in West Germany has caused the loss of vegetative ground cover and has accelerated soil erosion rates, resulting in extensive environmental damage, safety hazards, and unrealistic training habitats. The objectives of this project are to develop and evaluate revegetation procedures for establishing adequate vegetative cover to control erosion at minimal costs and disruption to training activities. This project involved the development and installation of 12 revegetation procedures that combined four seedbed preparation methods and seeding options with three site-closure periods. In March 1987, the four seedbed preparation/seeding options and closure periods were selected, a study site design and location chosen, and specifications for the revegetation procedures developed. A German rehabilitation contractor attempted the specified seedbed preparation and seeding on the 13.5-ha site in June, but abnormally high rainfall, usually wet site conditions, and lack of adequate equipment prevented the contractor from completing six of the 12 planned procedures. Planning and execution of the project has nonetheless provided valuable information on the importance and use of soil analytical results, seed availability and cost data, contractor equipment requirements, and time required for planning future revegetation efforts. Continued monitoring of vegetative ground cover at the site for the next two years, combined with cost information, will provide necessary data to determine which of the six revegetation procedures is the most effective. These data will be used in planning future rehabilitation efforts on tactical training areas.

  8. Distribution system harmonic filter planning

    SciTech Connect

    Ortmeyer, T.H.; Hiyama, Takashi

    1996-10-01

    A planning methodology for distribution system harmonic filtering is proposed. The method is intended for use on radial distribution systems with no large harmonic sources. It is proposed that 60 hertz var planning be done first to allocate the var resources. Following this process, the harmonic filter planning can be readily accomplished. Characteristics of the distribution systems and the harmonic sources are exploited to provide a practical filter planning technique which is effective and efficient.

  9. Systems Check: Community Colleges Turn to Facilities Assessments to Plan Capital Projects and Avoid Expensive Emergency Repairs

    ERIC Educational Resources Information Center

    Joch, Alan

    2014-01-01

    With an emphasis on planning and cutting costs to make better use of resources, facilities managers at community colleges across the nation have undertaken facilities audits usually with the help of outside engineers. Such assessments analyze the history and structural integrity of buildings and core components on campus, including heating…

  10. 14 CFR 152.109 - Project eligibility: Airport planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project eligibility: Airport planning. 152....109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport master planning is not approved unless— (1) The location of the existing or proposed airport is...

  11. Customer-focused planning: Demonstration project summaries

    SciTech Connect

    George, S.S. )

    1992-12-01

    To succeed in the increasingly competitive and dynamic markets in which they operate, electric utilities are focusing ever greater attention on understanding and meeting customer needs. EPRI's Customer Focused Planning (CFP) project was established to develop concepts and tools that will help utilities enhance their commitment to customer service. The project team conducted a series of interviews and meetings with participating utilities to collaboratively implement crucial steps in the CFP process. Although there is no unique set of tools or single management approach for improving product and service delivery, customer-focused companies have at least five ideals in common. They (1) define goals and objectives in concrete terms, (2) extend the planning boundaries of the organization to include all members of the energy services infrastructure, (3) painstakingly link functional activities directly to customer needs, (4) incorporate the customer's voice in new product/ service design, and (5) align performance measures with customer needs. In addition, customer-focused companies use a variety of methods to improve customer satisfaction and company performance. These methods include conducting market research, developing market processes such as demand-side management contracting or bidding to reveal customer preferences, and involving customers more directly in the planning process. This report summarizes two brief demonstration projects conducted as part of EPRI's CFP project, one at Commonwealth Edison Company (CECo) and one at PSI Energy. The CECo project emphasized developing customer-focused performance measures for telephone inquiries. The PSI Energy project involved a one-day workshop underscoring two important CFP elements-understanding customer wants and explicitly linking those wants to utility activities.

  12. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  13. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  14. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  15. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  16. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  17. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2007-01-10

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  18. WELLTON GOVERNMENT CAMP. PLOT PLAN AND SCHEDULE. RESIDENCES & PROJECT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    WELLTON GOVERNMENT CAMP. PLOT PLAN AND SCHEDULE. RESIDENCES & PROJECT BUILDINGS. Drawing 50-308-4544, dated September 26, 1949. U.S. Department of the Interior, Bureau of Reclamation, Yuma, Arizona. - Wellton-Mohawk Irrigation System, Building No. 1 (House), 30601 Wellton-Mohawk Drive, Wellton, Yuma County, AZ

  19. Environmental Management System Plan

    SciTech Connect

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  20. Single-shell tank interim stabilization project plan

    SciTech Connect

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  1. PREPARING PERFECT PROJECT PLANS: A POCKET GUIDE FOR THE PREPARATION OF QUALITY ASSURANCE PROJECT PLANS

    EPA Science Inventory

    This Pocket Guide helps you prepare Quality Assurance (QA) Project Plans thoroughly and easily. he Risk Reduction Engineering Laboratory (RREL) utilizes a four-tiered project category approach in order to more effectively focus QA with respect to the intended use of the data and ...

  2. Strategic planning for an information system.

    PubMed

    Clement, H; Salois-Swallow, D

    1995-01-01

    1. BACKGROUND. This strategic plan was developed by members of the Ontario Nursing Informatics Group (ONIG), an affiliated group of the Registered Nurses Association of Ontario (RNAO), in response to priorities set by its membership. This project management approach is an overview of the step-by-step approach described in the workbook Framework for Planning Nursing Information Systems [1]. 2. PLANNING PROCESS. The first phase, "Getting Ready," of the planning process emphasizes the importance of developing a strategic vision and preparing a business case. The objectives to be attained include a review of the current healthcare trends and state-of-the-art, the development of commitment from managers, and the establishment of a project structure. Secondly, one must "Analyze the Needs" of the health care facility. The current system is reviewed and future information requirements are defined. To facilitate this analysis, a detailed review of the current system is undertaken, the current system costs are identified, the technical and functional requirements are determined, and anticipated costs and benefits are outlined. Phase three, "Choosing a System," involves selecting system(s) that best meet the needs of the healthcare facility. A detailed system review is undertaken; it includes planning for the selection process, developing a request for information and/or a request for proposal, attending vendor demonstrations, attending site visits, and negotiating the contract. "Implementing the System" outlines the project plan for integrating the selected system in the work environment. The activities involved in managing the change process include the identification of the project team, defining the project plan, reviewing the budget, tailoring the system to meet the health care facility requirements, developing policies and procedures, outlining educational requirements, installing new hardware and software, piloting the system, and managing the transition. During the

  3. Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-12-01

    In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

  4. 7 CFR 1208.54 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....54 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE PROCESSED... program, plan, or project authorized under this subpart. Such a program, plan, or project shall...

  5. 7 CFR 1208.54 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....54 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE PROCESSED... program, plan, or project authorized under this subpart. Such a program, plan, or project shall...

  6. A System for Planning Ahead

    NASA Technical Reports Server (NTRS)

    2002-01-01

    A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.

  7. Integrated project management plan for the Plutonium Finishing Plant stabilization and deactivation project

    SciTech Connect

    SINCLAIR, J.C.

    1999-05-03

    This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex.

  8. UAVSAR Flight-Planning System

    NASA Technical Reports Server (NTRS)

    2008-01-01

    A system of software partly automates planning of a flight of the Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) -- a polarimetric synthetic-aperture radar system aboard an unpiloted or minimally piloted airplane. The software constructs a flight plan that specifies not only the intended flight path but also the setup of the radar system at each point along the path.

  9. INTERIM GUIDANCE FOR DEVELOPING GLOBAL POSITIONING SYSTEM DATA COLLECTION STANDARD OPERATING PROCEDURES AND QUALITY ASSURANCE PROJECT PLANS

    EPA Science Inventory

    The United States Environmental Protection Agency Geospatial Quality Council developed this document to harmonize the process of collecting, editing, and exporting spatial data of known quality using the Global Positioning System (GPS). Each organizational entity may adopt this d...

  10. Real-Time Projection to Verify Plan Success During Execution

    NASA Technical Reports Server (NTRS)

    Wagner, David A.; Dvorak, Daniel L.; Rasmussen, Robert D.; Knight, Russell L.; Morris, John R.; Bennett, Matthew B.; Ingham, Michel D.

    2012-01-01

    The Mission Data System provides a framework for modeling complex systems in terms of system behaviors and goals that express intent. Complex activity plans can be represented as goal networks that express the coordination of goals on different state variables of the system. Real-time projection extends the ability of this system to verify plan achievability (all goals can be satisfied over the entire plan) into the execution domain so that the system is able to continuously re-verify a plan as it is executed, and as the states of the system change in response to goals and the environment. Previous versions were able to detect and respond to goal violations when they actually occur during execution. This new capability enables the prediction of future goal failures; specifically, goals that were previously found to be achievable but are no longer achievable due to unanticipated faults or environmental conditions. Early detection of such situations enables operators or an autonomous fault response capability to deal with the problem at a point that maximizes the available options. For example, this system has been applied to the problem of managing battery energy on a lunar rover as it is used to explore the Moon. Astronauts drive the rover to waypoints and conduct science observations according to a plan that is scheduled and verified to be achievable with the energy resources available. As the astronauts execute this plan, the system uses this new capability to continuously re-verify the plan as energy is consumed to ensure that the battery will never be depleted below safe levels across the entire plan.

  11. Planning "and" Sprinting: Use of a Hybrid Project Management Methodology within a CIS Capstone Course

    ERIC Educational Resources Information Center

    Baird, Aaron; Riggins, Frederick J.

    2012-01-01

    An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…

  12. Reconstitution planning: SPC final report 1424. [System Planning Corporation (SPC)

    SciTech Connect

    Not Available

    1992-06-01

    The Office of the Deputy Under Secretary of Defense for Policy ODUSD(P) tasked the University of California's Los Alamos National Laboratory (LANL) to conduct a study to determine and assess the requirements and options for maintaining and developing a flexible and sustainable reconstitution base over the long term. In support of that study effort, System Planning Corporation (SPC) working closely with ODUSD(P) staff, developed and demonstrated an analytic process for conducting DoD reconstitution planning analyses on a regular basis and as part of the DoD PPBS. Within ODUSD(P), this planning approach is often referred to generically as a capacity-driven'' planning approach. Under the SPC-developed planning approach, DoD components would develop and maintain a family of reconstitution plans organized hierarchically on the basis of broad equipment categories (i.e., aircraft, ships, tracked combat vehicles, missiles and space, and munitions). For each selected broad equipment category, the cognizant DoD component will develop a reconstitution planning document that addresses a 20-year planning horizon. The analytic process to be used in support of activation scheduling would consist of the following activities; Defining appropriate demand schedule(s) for providing reconstitution response options; Identifying a menu of programmatic options for satisfying the above demand schedule; Conducting sensitivity and cost analyses; Selecting a set of reconstitution program options; Integrating and summarizing in a comprehensive, Department-wide manner reconstitution program options for all reconstitution plans; Developing and issuing planning guidance to DoD components; Estimating and projecting needed budgetary resources; Defending selected reconstitution programs throughout the PPBS process and Congressional budget process.

  13. HLW system plan - revision 2

    SciTech Connect

    Not Available

    1994-01-14

    The projected ability of the Tank Farm to support DWPF startup and continued operation has diminished somewhat since revision 1 of this Plan. The 13 month delay in DWPF startup, which actually helps the Tank Farm condition in the near term, was more than offset by the 9 month delay in ITP startup, the delay in the Evaporator startups and the reduction to Waste Removal funding. This Plan does, however, describe a viable operating strategy for the success of the HLW System and Mission, albeit with less contingency and operating flexibility than in the past. HLWM has focused resources from within the division on five near term programs: The three evaporator restarts, DWPF melter heatup and completion of the ITP outage. The 1H Evaporator was restarted 12/28/93 after a 9 month shutdown for an extensive Conduct of Operations upgrade. The 2F and 2H Evaporators are scheduled to restart 3/94 and 4/94, respectively. The RHLWE startup remains 11/17/97.

  14. Plan for CELSS test bed project

    NASA Technical Reports Server (NTRS)

    Knott, W. M.

    1986-01-01

    The Closed Ecological Life Support Systems (CELSS) testbed project will achieve two major goals: It will develop the knowledge and technology needed to build and test biological or combined biological physiochemical regenerative life support systems. It will fabricate, test, and operate ground based facilities to accomplish proof-of-concent testing and evaluation leading to flight experimentation. The project will combine basic research and applied research/engineering to achieve a phased, integrated development of hardware, systems, and techniques for food and oxygen production, food processing, and waste processing in closed systems. The project will design, fabricate, and operate within three years a botanical production system scaled to a sufficient size to verify oxygen and nutrient load production (carbohydrates, fats, proteins) at a useable level. It will develop within five years a waste management system compatible with the botanical production system and a food processing system that converts available biomass into edible products. It will design, construct, and operate within ten years a ground based candidate CELSS that includes man as an active participant in the system. It will design a flight CELSS module within twelve years and construct and conduct initial flight tests within fifteen years.

  15. NIF Project Quality Assurance Program Plan Revision E

    SciTech Connect

    Dun, C; Brereton, S; Yatabe, J; Moses, E I

    2001-06-01

    The National Ignition Facility (NIF) is a key constituent of the Department Energy's (DOE's) Stockpile Stewardship Program. The NIF will use inertial confinement fusion (ICF) to produce ignition and energy gain in ICF targets and will perform weapons physics, weapons effects, and high-energy-density experiments in support of national security and civilian objectives. The primary mission of the NIF Project is the design and construction of the facility and equipment, acceptance testing, and activation. To accomplish this mission, the LLNL Director created the NIF Programs Directorate, and within that Directorate, the NIF Project Office to organize and manage the Project. The NIF Project Office establishes this QA Program to ensure its success. This QA Program Plan (QAPP) defines and describes the program--the management system--for specifying, achieving, and assuring the quality of all NIF Project work consistent with the policies of LLNL and the NIF Programs Directorate.

  16. Procedures and technical methods for transit-project planning

    SciTech Connect

    Ryan, J.M.; Emerson, D.J.; Thomas, E.L.; Mowll, K.U.; Ossi, A.J.

    1990-01-01

    The guidance is specifically designed for State and local agencies that are considering the implementation of fixed guideway transit projects--new rail systems, rail extensions, busways, and the like--with Urban Mass Transit Administration (UMTA) funds. Familiarity with the guidance is essential for all individuals involved in conducting an alternatives analysis involving new or extended heavy rail, light rail or busway projects for which UMTA funding is being contemplated. The guidance may also be of interest to local and State officials who are anxious to understand the Federal perspective on major investments and the type and amount of work which will be done by their staff and consultants to satisfy UMTA's alternatives analysis requirement. The guidance is divided into three major parts: The Major Capital Investment Planning Process; Conduct of the Technical Analysis; and The Decisionmaking Process. The manual also contains a series of appendices which bring together the most important regulations, policy statements, and other information relevant to project planning.

  17. Project management plan for the Objective Supply Capability Adaptive Redesign (OSCAR) project

    SciTech Connect

    Rasch, K.A.; Reid, R.W.

    1997-02-01

    This document establishes the project management plan for design and development of the Object Supply Capability Adaptive Redesign (OSCAR) Project. The purpose of the project management plan is to document the plans, goals, directions, commitments, approaches, and decisions that relate to guiding a project throughout its life cycle. Special attention is given to project goals, deliverables, sponsor and project standards, project resources, schedule, and cost estimates.

  18. Planning health care delivery systems.

    PubMed Central

    Baum, M A; Bergwall, D F; Reeves, P N

    1975-01-01

    The increasing concern and interest in the health delivery system in the United States has placed the health system planners in a difficult position. They are inadequately prepared, in many cases, to deal with the management techniques that have been designed for use with system problems. This situation has been compounded by the failure, until recently, of educational programs to train new health professionals in these techniques. Computer simulation is a technique that allows the planners dynamic feedback on his proposed plans. This same technique provides the planning student with a better understanding of the systems planning process. PMID:1115292

  19. NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)

    EPA Science Inventory

    This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...

  20. UMTRA Project Office Records Management Plan

    SciTech Connect

    Not Available

    1993-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office maintains two distinct records handling areas. One of the areas is maintained by a Technical Assistance Contractor (TAC), and is referred to as the UMTRA Project Document Control Center (UPDCC). The UPDCC manages all UMTRA records except those dealing with contracts, personnel, budgeting, finance, and any other documents which are of a purely administrative nature. The second area, the UMTRA Project Administrative Files Collection (UPAFC), contains all those records listed above that are not managed by the UPDCC. This Records Management Plan (RMP) for the UPAFC will be the framework for identifying the elements and activities that relate to the management and operational aspects involved in the handling of UPAFC. Guidelines for the program will be obtained from US Department of Energy (DOE) Orders. DOE Orders implement the guidelines issued by the National Archives and Records Administration (NARA), the final authority for records management. The RMP will address the life cycle of records, including their creation, maintenance, use, and disposition.

  1. Spent nuclear fuel project high-level information management plan

    SciTech Connect

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements

  2. Hydrologic index development and application to selected Coastwide Reference Monitoring System sites and Coastal Wetlands Planning, Protection and Restoration Act projects

    USGS Publications Warehouse

    Snedden, Gregg A.; Swenson, Erick M.

    2012-01-01

    Hourly time-series salinity and water-level data are collected at all stations within the Coastwide Reference Monitoring System (CRMS) network across coastal Louisiana. These data, in addition to vegetation and soils data collected as part of CRMS, are used to develop a suite of metrics and indices to assess wetland condition in coastal Louisiana. This document addresses the primary objectives of the CRMS hydrologic analytical team, which were to (1) adopt standard time-series analytical techniques that could effectively assess spatial and temporal variability in hydrologic characteristics across the Louisiana coastal zone on site, project, basin, and coastwide scales and (2) develop and apply an index based on wetland hydrology that can describe the suitability of local hydrology in the context of maximizing the productivity of wetland plant communities. Approaches to quantifying tidal variability (least squares harmonic analysis) and partitioning variability of time-series data to various time scales (spectral analysis) are presented. The relation between marsh elevation and the tidal frame of a given hydrograph is described. A hydrologic index that integrates water-level and salinity data, which are collected hourly, with vegetation data that are collected annually is developed. To demonstrate its utility, the hydrologic index is applied to 173 CRMS sites across the coast, and variability in index scores across marsh vegetation types (fresh, intermediate, brackish, and saline) is assessed. The index is also applied to 11 sites located in three Coastal Wetlands Planning, Protection and Restoration Act projects, and the ability of the index to convey temporal hydrologic variability in response to climatic stressors and restoration measures, as well as the effect that this community may have on wetland plant productivity, is illustrated.

  3. Tailoring Small IT Projects in the Project Planning Phase

    ERIC Educational Resources Information Center

    Mulhearn, Michael F.

    2011-01-01

    Project management (PM) and systems engineering (SE) are essential skills in information technology (IT). There is an abundance of information available detailing the comprehensive bodies of knowledge, standards, and best practices. Despite the volume of information, there is surprisingly little information about how to tailor PM and SE tasks for…

  4. Single-shell tank interim stabilization project plan

    SciTech Connect

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  5. Report on the Preservation Planning Project: University of Pennsylvania Libraries.

    ERIC Educational Resources Information Center

    Sparks, Peter G., Comp.

    The University of Pennsylvania Libraries' Preservation Planning Project was designed to explore new ideas for planning and operating a preservation program for the Penn Library. The first goal of the project was to study the feasibility of an organizational plan that would put the preservation effort under the direction of a small internal staff…

  6. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  7. Planning for large construction projects in space

    NASA Technical Reports Server (NTRS)

    Disher, J. H.

    1978-01-01

    The paper discusses briefly some broad plans for developing the technology needed for large construction projects in space ranging from orbiting solar power stations to large communications antennas. Space construction classes include assembly of modules, deployment of compacted structures, assembly of passive preformed pieces, and fabrication of structures from sheet stock. Technological areas related to structural concepts include (1) analyses for prediction of structural behavior, structural/control interaction, electromagnetic and control performance, and integrated design development; (2) electronics for signal conditioning and data acquisition, power distribution, and signal channel interference and multipaction; (3) concepts for shape control, attitude/pointing control, and orbital transfer and station keeping; and (4) materials and techniques for 30-year dimensional stable composites, thermal control, thin-lightweight structural alloys, and material joining in space. The concept of a power module for the construction operations is discussed along with a concept for a habitability module.

  8. Test plan for glass melter system technologies for vitrification of high-sodium content low-level radioactive liquid waste, Project No. RDD-43288

    SciTech Connect

    Higley, B.A.

    1995-03-15

    This document provides a test plan for the conduct of combustion fired cyclone vitrification testing by a vendor in support of the Hanford Tank Waste Remediation System, Low-Level Waste Vitrification Program. The vendor providing this test plan and conducting the work detailed within it is the Babcock & Wilcox Company Alliance Research Center in Alliance, Ohio. This vendor is one of seven selected for glass melter testing.

  9. The RHIC project -- Status and plans

    SciTech Connect

    Harrison, M.

    1995-05-01

    The Relativistic Heavy Ion Collider (RHIC) Project is in the 4th year of an estimated 8 year construction cycle at Brookhaven National Laboratory. The accelerator complex is designed to collide a variety of ion species at center-of-mass energies up to 100 GeV/nucleon in a two ring superconducting structure. Industrial magnet production is in progress as well as the other accelerator systems. This presentation will outline the status of the construction effort, near and long term goals.

  10. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    SciTech Connect

    Hays, W.H.

    1998-06-25

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  11. Project W-314 specific test and evaluation plan 241-AN-B valve pit

    SciTech Connect

    Hays, W.H.

    1998-04-08

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  12. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POPCORN... Secretary for approval any program, plan or project authorized under this subpart. Such programs, plans...

  13. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POPCORN... Secretary for approval any program, plan or project authorized under this subpart. Such programs, plans...

  14. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POPCORN... Secretary for approval any program, plan or project authorized under this subpart. Such programs, plans...

  15. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POPCORN... Secretary for approval any program, plan or project authorized under this subpart. Such programs, plans...

  16. National Ignition Facility project acquisition plan revision 1

    SciTech Connect

    Clobes, A.R.

    1996-10-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  17. PRE-QUALITY ASSURANCE PROJECT PLAN (QAPP) AGREEMENT (PQA) (HANDOUT)

    EPA Science Inventory

    The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...

  18. Information Systems for University Planning.

    ERIC Educational Resources Information Center

    Robinson, Robert J.

    This paper proposes construction of a separate data base environment for university planning information, distinct from data bases and systems supporting operational functioning and management. The data base would receive some of its input from the management information systems (MIS)/transactional data bases and systems through a process of…

  19. Planning-Programming-Budgeting Systems.

    ERIC Educational Resources Information Center

    Tudor, Dean

    Planning Programming and Budgeting Systems (PPBS) have been considered as either synonymous with abstract, advanced, mathematical systems analysis or as an advanced accounting and control system. If PPBS is to perform a useful function, both viewpoints must be combined such that a number of standardized procedures and reports are required and…

  20. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    SciTech Connect

    Hays, W.H.

    1998-05-19

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  1. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    SciTech Connect

    Hays, W.H.

    1998-05-19

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  2. Planning ATES systems under uncertainty

    NASA Astrophysics Data System (ADS)

    Jaxa-Rozen, Marc; Kwakkel, Jan; Bloemendal, Martin

    2015-04-01

    Aquifer Thermal Energy Storage (ATES) can contribute to significant reductions in energy use within the built environment, by providing seasonal energy storage in aquifers for the heating and cooling of buildings. ATES systems have experienced a rapid uptake over the last two decades; however, despite successful experiments at the individual level, the overall performance of ATES systems remains below expectations - largely due to suboptimal practices for the planning and operation of systems in urban areas. The interaction between ATES systems and underground aquifers can be interpreted as a common-pool resource problem, in which thermal imbalances or interference could eventually degrade the storage potential of the subsurface. Current planning approaches for ATES systems thus typically follow the precautionary principle. For instance, the permitting process in the Netherlands is intended to minimize thermal interference between ATES systems. However, as shown in recent studies (Sommer et al., 2015; Bakr et al., 2013), a controlled amount of interference may benefit the collective performance of ATES systems. An overly restrictive approach to permitting is instead likely to create an artificial scarcity of available space, limiting the potential of the technology in urban areas. In response, master plans - which take into account the collective arrangement of multiple systems - have emerged as an increasingly popular alternative. However, permits and master plans both take a static, ex ante view of ATES governance, making it difficult to predict the effect of evolving ATES use or climactic conditions on overall performance. In particular, the adoption of new systems by building operators is likely to be driven by the available subsurface space and by the performance of existing systems; these outcomes are themselves a function of planning parameters. From this perspective, the interactions between planning authorities, ATES operators, and subsurface conditions

  3. Project management plan for the gunite and associated tanks treatability studies project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1995-12-01

    This plan for the Gunite and Associated Tanks (GAAT) Treatability Studies Project satisfies the requirements of the program management plan for the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program as established in the Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program. This plan is a subtier of several other ER documents designed to satisfy the US Department of Energy (DOE) Order 4700.1 requirement for major systems acquisitions. This project management plan identifies the major activities of the GAAT Treatability Studies Project; establishes performance criteria; discusses the roles and responsibilities of the organizations that will perform the work; and summarizes the work breakdown structure, schedule, milestones, and cost estimate for the project.

  4. 7 CFR 1220.117 - Plans and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SOYBEAN PROMOTION, RESEARCH, AND CONSUMER INFORMATION Soybean Promotion and Research Order Definitions § 1220.117 Plans and projects....

  5. 7 CFR 1220.117 - Plans and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SOYBEAN PROMOTION, RESEARCH, AND CONSUMER INFORMATION Soybean Promotion and Research Order Definitions § 1220.117 Plans and projects....

  6. 7 CFR 1220.117 - Plans and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SOYBEAN PROMOTION, RESEARCH, AND CONSUMER INFORMATION Soybean Promotion and Research Order Definitions § 1220.117 Plans and projects....

  7. 7 CFR 1220.117 - Plans and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SOYBEAN PROMOTION, RESEARCH, AND CONSUMER INFORMATION Soybean Promotion and Research Order Definitions § 1220.117 Plans and projects....

  8. 7 CFR 1220.117 - Plans and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SOYBEAN PROMOTION, RESEARCH, AND CONSUMER INFORMATION Soybean Promotion and Research Order Definitions § 1220.117 Plans and projects....

  9. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  10. Fast Flux Test Facility project plan. Revision 2

    SciTech Connect

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  11. QA program plan plutonium stabilization and handling project W-460

    SciTech Connect

    SCHULTZ, J.W.

    1999-09-02

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

  12. Information System Plan.

    ERIC Educational Resources Information Center

    McIntyre, Chuck

    Prepared for review and discussion by the Board of Governors of the California Community Colleges (CCC), this report provides background and recommendations for the refinement, expansion, and increased use of the information system of the CCC Chancellor's Office. Following introductory material proposing an expanded scope of the information system…

  13. Hanford Waste Vitrification Plant Project Plan. Revision 1

    SciTech Connect

    Brown, R.W.

    1993-06-01

    A major mission of the US DOE is the permanent disposal of Hanford defense wastes by safe, environmentally acceptable, and cost effective methods which meet applicable regulations. The Hanford Waste Vitrification Plant (HWVP) Project was initiated to immobilize the Hanford high-level waste (HLW) and provide interim storage. The HWVP will vitrify the pre-treated HLW into borosilicate glass, cast the glass into stainless steel canisters, and store the canisters on site until they are shipped to a federal geologic repository. The HWVP project objective is to design, construct, and operate a facility for immobilizing defense high-level waste for storage. Technical objectives include using the Defense Waste Processing Facility designed plants systems or elements, where practical, and the exchange and review of information on plants in foreign countries. More definitive objectives for quality, reliability, environmental, and safety are provided in the HWVP Project Management Plan.

  14. Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study

    ERIC Educational Resources Information Center

    Battleson, Douglas Aloys

    2013-01-01

    Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…

  15. Tracking and data system support for the Pioneer project. Volume 2: Pioneer 11 prelaunch planning through second trajectory correction, to 1 May 1973

    NASA Technical Reports Server (NTRS)

    Barton, W. R.; Miller, R. B.

    1975-01-01

    The tracking and data system support of the planning, testing, launch, near-earth, and deep space phases of the Pioneer 11 Jupiter Mission are described, including critical phases of spacecraft flight and guidance. Scientific instruments aboard the spacecraft registered information relative to interplanetary particles and fields. Knowledge of the celestial mechanics of the solar system was improved through radiometric data gathering. Network performance, details of network support activity, and special support activities are discussed.

  16. B plant transition project management plan

    SciTech Connect

    Godfrey, S.D.

    1997-01-22

    The mission of the B Plant Transition Project is to place B Plant and its ancillary facilities (referred to as B Plant throughout this document) in a safe and stable condition which requires minimal long term surveillance and maintenance (S&M), thereby reducing the risks associated with the current radiological and chemical inventory and the costs for S&M until disposition. Transition may include activities such as removal of stored radioactive and hazardous materials, safe shutdown of support systems such as electrical circuits and ventilation, and installation of new or modified systems required to support S&M for a 10 year period. The goal of this Project is to complete B Plant transition activities by September 30, 1998. During transition, the Waste Encapsulation and Storage Facility will be isolated from B Plant for stand alone operation. Upon completion of transition, B Plant will be turned over to the Office of Environmental Restoration (EM-40) for the S&M phase of B Plant decommissioning.

  17. B Plant Transition Project Management Plan

    SciTech Connect

    Godfrey, S.D.

    1996-05-06

    The mission of the B Plant Transition Project is to place B Plant and its ancillary facilities (refeffed to as B Plant throughout this document) in a safe and stable condition which requires minimal long term surveillance and maintenance (S&M), thereby reducing the risks associated with the current radiological and chemical inventory and the costs for S&M until disposition. Transition may include activities such as removal of stored radioactive and hazardous materials, safe shutdown of support systems such as electrical circuits and ventilation, and installation of new or modified systems required to support S&M for a 10 year period. The goal of this Project is to complete B Plant transition activities by September 30, 1998. During transition, the Waste Encapsulation and Storage Facility will be isolated from B Plant for stand alone operation. Upon completion of transition, B Plant will be turned over to the Office of Environmental Restoration (EM-40) for the S&M phase of B Plant decommissioning.

  18. MSFC Propulsion Systems Department Knowledge Management Project

    NASA Technical Reports Server (NTRS)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  19. Project W-314 Specific Test and Evaluation Plan 241-AN-A Valve Pit

    SciTech Connect

    HAMMERS, J.S.

    1999-08-25

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  20. Planning Project For The Coordinating Council For Higher Education.

    ERIC Educational Resources Information Center

    Wisconsin Coordinating Council for Higher Education, Madison.

    The purpose of this planning project is to develop policies, plans, and procedures to improve higher education in Wisconsin. To achieve this goal, attention was concentrated in the following areas: (1) budget analysis, (2) fund disbursement, (3) distribution of costs among students, local, state, and federal governments, (4) projections of space…

  1. Project W-314 Specific Test and Evaluation Plan 241-AN-B Valve Pit

    SciTech Connect

    HAMMERS, J.S.

    1999-08-25

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities performed on the 241-AN-B Valve Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  2. An automatic assembly planning system

    NASA Astrophysics Data System (ADS)

    Huang, Y. F.; Lee, C. S. G.

    An automatic assembly planning system which takes the CAD description of a product as input and automatically generates an assembly plan subject to the resource constraint of a given assembly cell is presented. The system improves the flexibility and productivity of flexible manufacturing systems and is composed of five modules: world database, simulated world model, knowledge acquisition mechanism, planning knowledge base, and assembly planner. The acquired knowledge forms the planning knowledge base. The simulated world model keeps track of the current state of the assembly world. In the initial state, all the components are separated, while in the final state, all the components are assembled. The assembly planner is made up of a set of production rules which models the effects of real assembly tasks. By repeatedly applying these production rules to the simulated world state, the planner transforms the initial state into the final state. The set of rules applied during this transformation process forms the assembly plan to actually assemble the product in the given assembly cell. Examples are given to illustrate the concepts in these five modules.

  3. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    1999-12-14

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

  4. Department of Energy Project Management System

    SciTech Connect

    Not Available

    1981-01-08

    This manual provides guidance to all appropriate personnel for implementation of DOE Project Management Policy. It sets forth the principles and requirements that govern the development, approval, and execution of DOE's outlay programs as embodied within the Project Management System (PMS). Its primary goal is to assure application of sound management principles providing a disciplined, systematic, and coordinated approach resulting in efficient planning, organization, coordination, budgeting, management, review, and control of DOE projects. The provisions of this manual are mandatory for the Department's Major Systems Acquisitions (MSA's) and Major Projects and will be used for other projects to the extent practicable. Department's project-management task is over 250 projects, with a total estimated cost in excess of $24 billion at completion. This diverse array of project activities requires a broad spectrum of scientific, engineering, and management skills to assure that they meet planned technical and other objectives and are accomplished on schedule, within cost and scope, and that they serve the purposes intended. In recognition of these requirements and the Department's ever-increasing magnitude of responsibilities, an interim Project Management System was established and has been in use for over a year. This manual constitutes an update of the system based on the experience gained and lessons learned during this initial period.

  5. Licensing plan for UMTRA project disposal sites. Final [report

    SciTech Connect

    Not Available

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC`s acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information.

  6. GEWEX America Prediction Project (GAPP) Science and Implementation Plan

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The purpose of this Science and Implementation Plan is to describe GAPP science objectives and the activities required to meet these objectives, both specifically for the near-term and more generally for the longer-term. The GEWEX Americas Prediction Project (GAPP) is part of the Global Energy and Water Cycle Experiment (GEWEX) initiative that is aimed at observing, understanding and modeling the hydrological cycle and energy fluxes at various time and spatial scales. The mission of GAPP is to demonstrate skill in predicting changes in water resources over intraseasonal-to-interannual time scales, as an integral part of the climate system.

  7. NASA Global Hawk: Project Overview and Future Plans

    NASA Technical Reports Server (NTRS)

    Naftel, Chris

    2011-01-01

    The NASA Global Hawk Project is supporting Earth Science research customers. These customers include: US Government agencies, civilian organizations, and universities. The combination of the Global Hawk's range, endurance, altitude, payload power, payload volume and payload weight capabilities separates the Global Hawk platform from all other platforms available to the science community. This presentation includes an overview of the concept of operations and an overview of the first two science campaigns. In addition the future science plans, using the NASA Global Hawk System, will be presented.

  8. NASA Global Hawk: Project Update and Future Plans

    NASA Technical Reports Server (NTRS)

    Naftel, Chris

    2010-01-01

    The NASA Global Hawk Project is supporting Earth Science research customers. These customers include: US Government agencies, civilian organizations, and universities. The combination of the Global Hawk's range, endurance, altitude, payload power, payload volume and payload weight capabilities separates the Global Hawk platform from all other platforms available to the science community. This presentation includes an overview of the concept of operations and an overview of the first two science campaigns. In addition the future science plans, using the NASA Global Hawk System, will be presented.

  9. Planning Istanbul's Public Library System.

    ERIC Educational Resources Information Center

    Dokmeci, Vedia; Korca, Perver

    1992-01-01

    Discussion of the role of public libraries in socioeconomic development focuses on an evaluation of the existing library system in Istanbul (Turkey) and proposes a plan for its balanced development with respect to population distribution and technological advances. Highlights include building design, library automation, and financial…

  10. How to Plan Ventilation Systems.

    ERIC Educational Resources Information Center

    Clarke, John H.

    1963-01-01

    Ventilation systems for factory safety demand careful planning. The increased heat loads and new processes of industry have introduced complex ventilation problems in--(1) ventilation supply, (2) duct work design, (3) space requirements, (4) hood face velocities, (5) discharge stacks, and (6) building eddies. This article describes and diagrams…

  11. State Planning System. Case Studies.

    ERIC Educational Resources Information Center

    Cherin, Ellen, Ed.

    The State Planning System (SPS) is a policy-oriented management tool intended to help analyze the interrelated effects of alternative policies and their relationships to state goals. Two pilot-test case studies are described--the SPS tuition policy evaluation conducted in Colorado, and New York's SPS evaluation of the applicability of large scale…

  12. WESTERN AIRBORNE CONTAMINANTS ASSESSMENT PROJECT RESEARCH PLAN

    EPA Science Inventory

    The goal of the Western Airborne Contaminants Assessment Project (WACAP) is to assess the deposition of airborne contaminants in Western National Parks, providing regional and local information on exposure, accumulation, impacts, and probable sources. This project is being desig...

  13. NASA's Radioisotope Power Systems - Plans

    NASA Technical Reports Server (NTRS)

    Hamley, John A.; Mccallum, Peter W.; Sandifer, Carl E., II; Sutliff, Thomas J.; Zakrajsek, June F.

    2015-01-01

    NASA's Radioisotope Power Systems (RPS) Program continues to plan and implement content to enable planetary exploration where such systems could be needed, and to prepare more advanced RPS technology for possible infusion into future power systems. The 2014-2015 period saw significant changes, and strong progress. Achievements of near-term objectives have enabled definition of a clear path forward in which payoffs from research investments and other sustaining efforts can be applied. The future implementation path is expected to yield a higher-performing thermoelectric generator design, a more isotope-fuel efficient system concept design, and a robust RPS infrastructure maintained effectively within both NASA and the Department of Energy. This paper describes recent work with an eye towards the future plans that result from these achievements.

  14. Program Planning and Grant Writing in One Massachusetts School System.

    ERIC Educational Resources Information Center

    Maloy, Robert W.; Seldin, Clement A.

    1982-01-01

    The Greenfield Secondary Schools Project in Greenfield (Massachusetts) includes a planning and grant-writing system, a grantsperson, and a structure encouraging community involvement and interagency cooperation, and has enabled Greenfield to finance innovation in lean times. (Author/JM)

  15. Expedited technology demonstration project. Project baseline revision 2.2 and FY96 plan

    SciTech Connect

    1996-07-01

    The Expedited Technology Demonstration Project Plan, Mixed Waste Management Facility (MWMF) current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include feed preparation and feed delivery systems, and the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is provided. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in fiscal year 97, followed by the activation of feed preparation and final forms in fiscal year 98.

  16. Using Open Plan with integrated Xbase applications for effective project management solutions

    SciTech Connect

    Freier, K.D.; Hirschi, E.J.

    1994-04-01

    Open Plan`s open architecture allows the user many advantages that are not available from other project management software. One of these advantages is its ability to interface with various database management systems, thereby allowing the user to develop a project management system tailored to their specific needs. This open architecture offers maximum flexability to the user to personalize reports, screens, data structures, and develop customized management systems. Using Xbase, applications can be developed for every facet of a complete project management system including baseline development, performance measurement, reporting, and analysis. These applications can range from simple routines such as user-defined status worksheets, milestone logs and other reports, to complex cost,and schedule control systems. The combined power of Xbase and Open Plan can be used to produce effective project management solutions. Customized applications are easily obtainable allowing the user to gather information more timely and efficiently, produce customized reports, and analyze project management information more effectively.

  17. Phased project planning and development in anticipation of operational programs

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  18. Shippingport Station Decommissioning Project decommissioning plan. Volume XII

    SciTech Connect

    Not Available

    1983-01-01

    Information is presented concerning allowable residual contamination levels in soil for decommissioning the Shippingport reactor site; draft statement of work for the decommissioning operations contractor; the Shippingport Station Decommissioning Project Change Control Board charter; the surplus facilities management program; the Shippingport Station Decommissioning Project charter; DOE-RL/DOE-PNR program management agreement; and draft occupational medical plan for the decommissioning project.

  19. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  20. Summary of Activities and Policy Studies. Educational Policy and Planning Project. A Government of Indonesia-USAID Project.

    ERIC Educational Resources Information Center

    Boediono; And Others

    The Educational Policy and Planning (EPP) Project assists the Indonesian Ministry of Education and Culture (MOEC) in establishing an information system to improve policy analysis and formulation. There are five elements of the project strategy: increase the ability of MOEC staff to create and use information for use in policy research, strengthen…

  1. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  2. Laser autostereoscopic projection system

    NASA Astrophysics Data System (ADS)

    Wang, Yuchang; Huang, Junejei

    2013-09-01

    The current autostereoscopic projection system is accomplished by array projectors. It is easy to realize optically but has a drawback with size. Another type is to place the shutter on the screen. It saves the volume but reduces the efficiency depending on how many views are produced. The shutter in the lens aperture has the same efficiency problem, too. To overcome these problems, a full HD autostereoscopic projector based on the lens aperture switching type is proposed. It has RGB laser sources and can produce 16-views or even higher stereoscopic images. This system removes the shutter in the lens aperture by the opti-mechanism itself. The specific light on the lens aperture coming from the point on the DMD is reflected to different angles. The proper angle of light is generated in the object side by the relay and folding system. The UHP lamps or the LED rays are difficult to constrain in a relative small cone angle. For this reason, the laser is applied to the design. The very small etendue of the laser is good for this architecture. The rays are combined by dichroic filter from RGB laser sources then forming and expanding to the mirror. The mirror is synchronized with DMD by the DSP control system. The images of different views are generated by DMD and specific position of the mirror. By the double lenticular screen, the lens aperture is imaged to the observer's viewing zone and the 3D scene is created.

  3. Transuranic waste projections at SRS for long range planning

    SciTech Connect

    Hootman, H.E.; Cook, J.R.

    1994-05-01

    This report predicts 30 year receipts of solid transuranic (TRU) wastes from eventual plutonium facility deactivation and cleanup, and combines them with the existing TRU waste holdings to provide a technical and quantitative basis for interim and long range TRU waste management planning. The current TRU waste holdings have been characterized based on data from the Computerized Radioactive Waste Burial Records Analysis (COBRA) system. Six TRU waste disposition categories have been identified for existing TRU waste as shown in Table 1. An additional category has been quantified that includes projected waste volumes from the Decontamination and Decommissioning (D&D) of TRU waste generating facilities. These projections are based on COBRA data from D&D of the original plutonium finishing facilities in F and H Areas that were replaced in the 1970`s and 80`s.

  4. Mirror Confinement Systems: project summaries

    SciTech Connect

    Not Available

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided.

  5. River Protection Project (RPP) Dangerous Waste Training Plan

    SciTech Connect

    POHTO, R.E.

    2000-03-09

    This supporting document contains the training plan for dangerous waste management at River Protection Project TSD Units. This document outlines the dangerous waste training program developed and implemented for all Treatment, Storage, and Disposal (TSD) Units operated by River Protection Project (RPP) in the Hanford 200 East, 200 West and 600 Areas and the <90 Day Accumulation Area at 209E. Operating TSD Units managed by RPP are: the Double-Shell Tank (DST) System, 204-AR Waste Unloading Facility, Grout, and the Single-Shell Tank (SST) System. The program is designed in compliance with the requirements of Washington Administrative Code (WAC) 173-303-330 and Title 40 Code of Federal Regulations (CFR) 265.16 for the development of a written dangerous waste training program and the Hanford Facility Permit. Training requirements were determined by an assessment of employee duties and responsibilities. The RPP training program is designed to prepare employees to operate and maintain the Tank Farms in a safe, effective, efficient, and environmentally sound manner. In addition to preparing employees to operate and maintain the Tank Farms under normal conditions, the training program ensures that employees are prepared to respond in a prompt and effective manner should abnormal or emergency conditions occur. Emergency response training is consistent with emergency responses outlined in the following Building Emergency Plans: HNF-IP-0263-TF and HNF-=IP-0263-209E.

  6. Spent nuclear fuel project integrated schedule plan

    SciTech Connect

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  7. Exploration Medical System Demonstration Project

    NASA Technical Reports Server (NTRS)

    Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.

    2011-01-01

    A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide

  8. Regenerative fuel cell systems for project pathfinder

    NASA Technical Reports Server (NTRS)

    Huff, J. R.; Hedstrom, J.; Vanderborgh, N. E.; Prokopius, P.

    1989-01-01

    The objectives of a surface power program, an element of the exploration thrust of the Pathfinder project, and plans for meeting them are outlined. Technological assessment and tradeoff studies of fuel cell and electrolyzer technologies suitable for use in a regenerative fuel cell are described. The viability of proton exchange membranes (PEM) in meeting the system requirements is discussed.

  9. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    SciTech Connect

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports.

  10. A Values Based Objectives Planning System: Planning for Quality Education.

    ERIC Educational Resources Information Center

    Burns, Mildred L.

    The Values Based Objectives Planning System is a method of educational planning that will achieve quality education, according to the author, by expressing goals and objectives as values instead of as behaviors. The author first defines planning as the preparation in visual form of a conceptual model of a thing, operation, or event. She then…

  11. Comprehensive Cost Planning Yields Successful Tech Projects

    ERIC Educational Resources Information Center

    Breeding, Marshall

    2006-01-01

    In this article, the author calls for librarians to find ways to implement technology projects with very limited budgets and to consider all the cost components of a technology project amidst the economic pressures. The author offers some perspective on what is involved in trying to accomplish important work with limited resources while…

  12. Advanced Ground Systems Maintenance Physics Models for Diagnostics Project

    NASA Technical Reports Server (NTRS)

    Harp, Janicce Leshay

    2014-01-01

    The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations.

  13. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  14. River Protection Project information systems assessment

    SciTech Connect

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  15. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE... development of new marketing strategies; to advance the image and desirability of, increase the efficiency of..., effectuation, administration, and evaluation of programs, plans, and projects for marketing...

  16. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE... development of new marketing strategies; to advance the image and desirability of, increase the efficiency of..., effectuation, administration, and evaluation of programs, plans, and projects for marketing...

  17. Project Helios-A. [mission planning for solar probe

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The Helios-A solar probe which will fly within 28 million miles of the sun is described as a joint American and German project. The spacecraft and instrument designs, planned experiments, and mission are briefly discussed.

  18. Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.

    SciTech Connect

    Bissell, Gael

    1985-01-01

    This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.

  19. Wildlife and Wildlife Habitat Mitigation Plan for Libby Hydroelectric Project, Final Report.

    SciTech Connect

    Mundinger, John

    1985-01-01

    This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Libby hydroelectric project. Mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. The report describes mitigation that has already taken place and 8 recommended mitigation projects designed to complete total wildlife mitigation. 8 refs., 2 figs., 12 tabs.

  20. Yield model development project implementation plan

    NASA Technical Reports Server (NTRS)

    Ambroziak, R. A.

    1982-01-01

    Tasks remaining to be completed are summarized for the following major project elements: (1) evaluation of crop yield models; (2) crop yield model research and development; (3) data acquisition processing, and storage; (4) related yield research: defining spectral and/or remote sensing data requirements; developing input for driving and testing crop growth/yield models; real time testing of wheat plant process models) and (5) project management and support.

  1. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    SciTech Connect

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  2. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  3. 7 CFR 1150.117 - Plans and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 9 2013-01-01 2013-01-01 false Plans and projects. 1150.117 Section 1150.117 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MILK), DEPARTMENT OF AGRICULTURE DAIRY PROMOTION PROGRAM Dairy Promotion and Research Order Definitions § 1150.117 Plans...

  4. DOE plan for UMTRA Project water protection standards

    SciTech Connect

    Not Available

    1986-07-01

    This plan was developed to define DOE`s implementation of water protection standards for the UMTRA Project, on an interim basis, until the EPA promulgates revised standards in response to the September, 1985, decision by the Tenth Circuit Court of Appeals. This plan presents the historical background of the development of the Title I standards and the rationale for the DOE implementation approach.

  5. DOE plan for UMTRA Project water protection standards

    SciTech Connect

    Not Available

    1986-07-01

    This plan was developed to define DOE's implementation of water protection standards for the UMTRA Project, on an interim basis, until the EPA promulgates revised standards in response to the September, 1985, decision by the Tenth Circuit Court of Appeals. This plan presents the historical background of the development of the Title I standards and the rationale for the DOE implementation approach.

  6. Operational Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect

    Perkins, C.J.

    1994-08-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and operational environmental monitoring performed by Westinghouse Hanford Company as it implements the Operational Environmental Monitoring program. This plan applies to all sampling and monitoring activities performed by Westinghouse Hanford Company in implementing the Operational Environmental Monitoring program at the Hanford Site.

  7. Ask Pete, software planning and estimation through project characterization

    NASA Technical Reports Server (NTRS)

    Kurtz, T.

    2001-01-01

    Ask Pete, was developed by NASA to provide a tool for integrating the estimation and planning activities for a software development effort. It incorporates COCOMO II estimating with NASA's software development practices and IV&V criteria to characterize a project. This characterization is then used to generate estimates and tailored planning documents.

  8. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    SciTech Connect

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  9. Environmentally Sound Small-Scale Agricultural Projects: Guidelines for Planning. Revised Edition.

    ERIC Educational Resources Information Center

    Altieri, Miguel; Vukasin, Helen L., Ed.

    Environmental planning requires more than finding the right technology and a source of funds. Planning involves consideration of the social, cultural, economic, and natural environments in which the project occurs. The challenge is to develop sustainable food systems that have reasonable production but do not degrade the resource base and upset…

  10. OAST planning model for space systems technology

    NASA Technical Reports Server (NTRS)

    Sadin, S. R.

    1978-01-01

    The NASA Office of Aeronautics and Space Technology (OAST) planning model for space systems technology is described, and some space technology forecasts of a general nature are reported. Technology forecasts are presented as a span of technology levels; uncertainties in level of commitment to project and in required time are taken into account, with emphasis on differences resulting from high or low commitment. Forecasts are created by combining several types of data, including information on past technology trends, the trends of past predictions, the rate of advancement predicted by experts in the field, and technology forecasts already published.

  11. System integration test plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-24

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  12. Non-Profit/Higher Education Project Management Series: The Project Plan

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  13. Reactor Safety Planning for Prometheus Project, for Naval Reactors Information

    SciTech Connect

    P. Delmolino

    2005-05-06

    The purpose of this letter is to submit to Naval Reactors the initial plan for the Prometheus project Reactor Safety work. The Prometheus project is currently developing plans for cold physics experiments and reactor prototype tests. These tests and facilities may require safety analysis and siting support. In addition to the ground facilities, the flight reactor units will require unique analyses to evaluate the risk to the public from normal operations and credible accident conditions. This letter outlines major safety documents that will be submitted with estimated deliverable dates. Included in this planning is the reactor servicing documentation and shipping analysis that will be submitted to Naval Reactors.

  14. Environmentally Sound Small-Scale Water Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Tillman, Gus

    This manual is the second volume in a series of publications on community development programs. Guidelines are suggested for small-scale water projects that would benefit segments of the world's urban or rural poor. Strategies in project planning, implementation and evaluation are presented that emphasize environmental conservation and promote…

  15. Guide of Ideas for Planning and Implementing Intergenerational Projects

    ERIC Educational Resources Information Center

    Pinto, Teresa Almeida; Marreel, Iris; Hatton-Yeo, Alan

    2009-01-01

    "Guide of Ideas for Planning and Implementing Intergenerational Projects," is for all professionals that are or wish to be enrolled in the development of intergenerational activities. This "Guide" is the main product of the Project MATES--Mainstreaming Intergenerational Solidarity, co-financed by the Lifelong Learning Programme from the…

  16. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... disbursements of the Board in the administration of this subpart, including the projected costs of Hass avocado..., or on its own initiative develop programs, plans and projects for Hass avocado promotion,...

  17. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... disbursements of the Board in the administration of this subpart, including the projected costs of Hass avocado..., or on its own initiative develop programs, plans and projects for Hass avocado promotion,...

  18. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... disbursements of the Board in the administration of this subpart, including the projected costs of Hass avocado..., or on its own initiative develop programs, plans and projects for Hass avocado promotion,...

  19. Metropolitan Planning Project, 1977-78. Final Performance Report.

    ERIC Educational Resources Information Center

    Arnoff, Steven M.

    This document provides a description of the Metropolitan Planning Project (MPP), its objectives, strategies, and an evaluation of its implementation in the Boston area. In order to encourage the voluntary elimination, reduction, and prevention of minority group isolation in elementary and secondary schools in Boston, the project focuses on two…

  20. QUEST2: Release 1: Project plan deliverable set

    SciTech Connect

    Braaten, F.D.

    1995-02-10

    This Project Management Plan combines the project management deliverables from the P+ methodology which are applicable to Release 1 of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19.

  1. Pyramid Project: An Exemplary Staff Development Plan.

    ERIC Educational Resources Information Center

    Ardmore City Schools, OK.

    The Ardmore, Oklahoma, School District developed the 3-year Pyramid Project to implement the following recommendations of the Sid W. Richardson Foundation Study of exemplary programs for high ability students: (1) broaden the process for assessing student abilities, (2) adopt continuous progress and appropriate pacing, (3) cultivate students'…

  2. Spent Nuclear Fuel (SNF) Project Execution Plan

    SciTech Connect

    LEROY, P.G.

    2000-11-03

    The Spent Nuclear Fuel (SNF) Project supports the Hanford Site Mission to cleanup the Site by providing safe, economic, environmentally sound management of Site spent nuclear fuel in a manner that reduces hazards by staging it to interim onsite storage and deactivates the 100 K Area facilities.

  3. School Yard Environmental Projects: A Planning Primer.

    ERIC Educational Resources Information Center

    Megalos, Mark A.; And Others

    This guide describes how to establish successful trails, outdoor classrooms, or other environmental education improvements on rural and urban school grounds. Teachers are encouraged to promote the environmental project as a solution to an existing problem and to include all parties and stakeholders that can benefit from a coordinated environmental…

  4. Planning for Preservation during Mass Digitization Projects

    ERIC Educational Resources Information Center

    Teper, Jennifer Hain; Shaw, Emily F.

    2011-01-01

    In anticipation of current and future mass digitization projects in which the University of Illinois at Urbana-Champaign's Library will participate, the Library's Conservation Unit began to gather data on the "scannability" of our general book collections to anticipate potential effects on conservation and preservation work flows. The findings…

  5. Remote Excavation System test plan

    SciTech Connect

    Walker, S.; Hyde, R.A.

    1993-05-01

    The Office of Technology Development (OTD) established the Robotics Technology Development Program (RTDP) to integrate robotic development activities on a national basis; provide needs-oriented, timely, and economical robotics technology to support environmental and waste operations activities at Department of Energy (DOE) sites; and provide the focus and direction for the near term (less than five years) and guidance for the tong-term (five to twenty years) research and development efforts for site-specific problems. The RTDP consists of several programs including the Buried Waste Robotics Program (BWRP), which addresses remote buried waste applications. The Remote Excavation System (RES) was developed under the RTDP to provide a safer method of excavating hazardous materials for both the DOE and the Department of Defense (DOD). The excavator, initially developed by the DOD as a manually-operated small excavator, has been modified for teleoperation with joint funding from the BWRP and the DOD. The Buried Waste Integrated Demonstration (BWID) and the Uranium Soils Integrated Demonstration (USID) are funding the demonstration, testing, and evaluation of the RES covered in this test plan. This document covers testing both at Oak Ridge National Laboratory (ORNL) and the Idaho National Engineering Laboratory (INEL), as funded by BWID and USID. This document describes the tests planned for the RES demonstration for the BWRP. The purposes of the test plan are (1) to establish test parameters to ensure that the demonstration results are deemed useful and usable and (2) to demonstrate performance in a safe manner within all regulatory requirements.

  6. NIF Project Management System Description

    SciTech Connect

    Wolfe, C.R.

    1997-08-01

    This document has been prepared for two purposes: 1. To demonstrate compliance with the project management requirements of DOE Order 430. 1, Life-Cycle Asset Management (LCAM). 2. To summarize in one place the approved Project documents which, taken as a whole, describe the NIF Project Management System.

  7. 25 CFR 170.415 - What is pre-project planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is pre-project planning? 170.415 Section 170.415... Transportation Planning § 170.415 What is pre-project planning? (a) Pre-project planning is part of overall transportation planning and includes the activities conducted before final project approval on the...

  8. ERD UMTRA Project quality assurance program plan, Revision 7

    SciTech Connect

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors.

  9. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  10. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    SciTech Connect

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-12-31

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites` input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves.

  11. Tank waste remediation system characterization project quality policies

    SciTech Connect

    Trible, T.C., Westinghouse Hanford

    1996-07-31

    This quality plan describes the system used by Characterization Project management to achieve quality. This plan is comprised on eleven quality policies which, when taken together, form a management system deployed to achieve quality. This quality management system is based on the customer`s quality requirements known as the `RULE`, 10 CFR 830.120, Quality Assurance.

  12. Tank waste remediation system characterization project quality policies

    SciTech Connect

    Board, D.C.

    1997-09-24

    This quality plan describes the system used by Characterization Project management to achieve quality. This plan is comprised of eleven quality policies which, when taken together, form a management system deployed to achieve quality. This quality management system is based on the customer`s quality requirements known as the `RULE`, 10 CFR 830.120, Quality Assurance.

  13. Project Management Plan for the INEL technology logic diagrams

    SciTech Connect

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ``Technology Logic Diagrams For The INEL.`` The work on this project will be conducted by personnel in EG&G Idaho, Inc.`s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

  14. Project Management Plan for the INEL technology logic diagrams

    SciTech Connect

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

  15. Integrated monitoring plan for the Hanford groundwater monitoring project

    SciTech Connect

    Hartman, M.J.; Dresel, P.E.; McDonald, J.P.; Mercer, R.B.; Newcomer, D.R.; Thornton, E.C.

    1998-09-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy (DOE) manages these activities through the Hanford Groundwater Monitoring Project (groundwater project), which is the responsibility of Pacific Northwest National Laboratory. The groundwater project does not include all of the monitoring to assess performance of groundwater remediation or all monitoring associated with active facilities. This document is the first integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; other, established monitoring plans by reference; and a master well/constituent/frequency matrix for the entire Hanford Site.

  16. Advanced Hybrid Particulate Collector Project Management Plan

    SciTech Connect

    Miller, S.J.

    1995-11-01

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

  17. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  18. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  19. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  1. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  2. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  3. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  4. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  5. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  6. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  7. Tunisia Renewable Energy Project systems description report

    NASA Technical Reports Server (NTRS)

    Scudder, L. R.; Martz, J. E.; Ratajczak, A. F.

    1986-01-01

    In 1979, the Agency for International Development (AID) initiated a renewable energy project with the Government of Tunisia to develop an institutional capability to plan and institute renewable energy technologies in a rural area. The specific objective of the district energy applications subproject was to demonstrate solar and wind energy systems in a rural village setting. The NASA Lewis Research Center was asked by the AID Near East Bureau to manage and implement this subproject. This report describes the project and gives detailed desciptions of the various systems.

  8. Engineering task plan for purged light system

    SciTech Connect

    BOGER, R.M.

    1999-05-11

    A purged, closed circuit television system is currently used to video inside of waste tanks. The video is used to support inspection and assessment of the tank interiors, waste residues, and deployed hardware. The system is also used to facilitate deployment of new equipment. A new light source has been requested by Characterization Project Operations (CPO) for the video system. The current light used is mounted on the camera and provides 75 watts of light, which is insufficient for clear video. Other light sources currently in use on the Hanford site either can not be deployed in a 4-inch riser or do not meet the ignition source controls. The scope of this Engineering Task Plan is to address all activities associated with the specification and procurement of a light source for use with the existing CPO video equipment. The installation design change to tank farm facilities is not within the scope of this ETP.

  9. Advanced Ground Systems Maintenance Prognostics Project

    NASA Technical Reports Server (NTRS)

    Perotti, Jose M.

    2015-01-01

    The project implements prognostics capabilities to predict when a component system or subsystem will no longer meet desired functional or performance criteria, called the end of life. The capability also provides an assessment of the remaining useful life of a hardware component. The project enables the delivery of system health advisories to ground system operators. This project will use modeling techniques and algorithms to assess components' health andpredict remaining life for such components. The prognostics capability being developed will beused:during the design phase and during pre/post operations to conduct planning and analysis ofsystem design, maintenance & logistics plans, and system/mission operations plansduring real-time operations to monitor changes to components' health and assess their impacton operations.This capability will be interfaced to Ground Operations' command and control system as a part ofthe AGSM project to help assure system availability and mission success. The initial modelingeffort for this capability will be developed for Liquid Oxygen ground loading applications.

  10. Submergence Vulnerability Index development and application to Coastwide Reference Monitoring System Sites and Coastal Wetlands Planning, Protection and Restoration Act projects

    USGS Publications Warehouse

    Stagg, Camille L.; Sharp, Leigh Anne; McGinnis, Thomas E.; Snedden, Gregg A.

    2013-01-01

    Since its implementation in 2003, the Coastwide Reference Monitoring System (CRMS) in Louisiana has facilitated the creation of a comprehensive dataset that includes, but is not limited to, vegetation, hydrologic, and soil metrics on a coastwide scale. The primary impetus for this data collection is to assess land management activities, including restoration efforts, across the coast. The aim of the CRMS analytical team is to provide a method to synthesize this data to enable multiscaled evaluations of activities in Louisiana’s coastal wetlands. Several indices have been developed to facilitate data synthesis and interpretation, including a Floristic Quality Index, a Hydrologic Index, and a Landscape Index. This document details the development of the Submergence Vulnerability Index, which incorporates sediment-elevation data as well as hydrologic data to determine the vulnerability of a wetland based on its ability to keep pace with sea-level rise. The objective of this document is to provide Federal and State sponsors, project managers, planners, landowners, data users, and the rest of the coastal restoration community with the following: (1) data collection and model development methods for the sediment-elevation response variables, and (2) a description of how these response variables will be used to evaluate CWPPRA project and program effectiveness.

  11. National Ignition Facility Project Execution Plan

    SciTech Connect

    Moses, E

    2000-08-14

    The ''National Ignition Facility (NIF) Justification of Mission Need'', which was approved by the Secretary of Energy in January 1993, defines the mission of the National Inertial Confinement Fusion (ICF) Program and discusses the specific mission of the NIF Project. The NIF experimental capability will allow nuclear-weapons scientists to assess stockpile problems, verify computational tools, test for nuclear-weapons effects, and increase their understanding of weapons physics. The three weapons laboratory directors and the National Nuclear Security Administration (NNSA) Deputy Administrator for Defense Programs have reviewed the role of the NIT; in Stockpile Stewardship in a joint letter. Along with the Accelerated Strategic Computing Initiative numerical simulations and other aboveground experimental facilities, the NIF will provide critical data that will allow the United States to maintain its technical capabilities in nuclear weapons in the absence of underground testing. As a secondary objective, the NIF will advance our understanding of ICF and help to assess its potential as an energy source. Achieving fusion ignition in the NIF will advance both defense and energy objectives. In affirming the Project's Critical Decision 2,* ''Approval of New Start'', the Secretary of Energy verified the mission need and emphasized that the NIF has the potential to contribute significantly to the DOE missions.

  12. UMTRA Project Office quality assurance program plan. Revision 6

    SciTech Connect

    Not Available

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors.

  13. Final Report for the Soboba Strategic Tribal Energy Planning Project

    SciTech Connect

    Miller, Kim

    2013-09-17

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  14. Project management plan for Project W-178, 219-S secondary containment

    SciTech Connect

    Buckles, D.I.

    1995-01-26

    This Project Management Plan (PMP) establishes the organizational responsibilities, control systems, and procedures for managing the execution of project activities for Project W-178, the 219-S Secondary Containment Upgrade. The scope of this project will provide the 219-S Facility with secondary containment for all tanks and piping systems. Tank 103 will be replaced with a new tank which will be designated as Tank 104. Corrosion protection shall be installed as required. The cells shall be cleaned and the surface repaired as required. The 219-S Waste Handling Facility (219-S Facility), located in the 200 West Area, was constructed in 1951 to support the 222-S Laboratory Facility. The 219-S Facility has three tanks, TK-101, TK-102, and TK-103, which receive and neutralize low level radioactive wastes from the 222-S Laboratory. For purposes of the laboratory, the different low level waste streams have been designated as high activity and intermediate activity. The 219-S Facility accumulates and treats the liquid waste prior to transferring it to SY Tank Farm in the 200-W Area. Transfers are normally made by pipeline from the 219-S Facility to the 241-SY Tank Farm. Presently transfers are being made by tanker truck to the 200-E Area Tank Farms due to the diversion box catch tank which has been removed from service.

  15. UMTRA Project Office Quality Assurance Program Plan. Revision 5

    SciTech Connect

    Not Available

    1993-11-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office directs the overall Project. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA Project Office shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan or an industry standard format that has been approved by the DOE Project Office.

  16. Energy Strategic Planning & Self-Sufficiency Project

    SciTech Connect

    Greg Retzlaff

    2005-03-30

    This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follow: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

  17. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Annual review of system safety program plan and... SAFETY OVERSIGHT Role of the State Oversight Agency § 659.25 Annual review of system safety program plan... annual review of its system safety program plan and system security plan. (b) In the event the...

  18. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Annual review of system safety program plan and... SAFETY OVERSIGHT Role of the State Oversight Agency § 659.25 Annual review of system safety program plan... annual review of its system safety program plan and system security plan. (b) In the event the...

  19. Coordinating robot motion, sensing, and control in plans. LDRD project final report

    SciTech Connect

    Xavier, P.G.; Brown, R.G.; Watterberg, P.A.

    1997-08-01

    The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The project considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.

  20. Tank waste remediation system systems engineering management plan

    SciTech Connect

    Peck, L.G.

    1998-01-08

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.

  1. UMTRA project water sampling and analysis plan, Tuba City, Arizona

    SciTech Connect

    1996-02-01

    Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site.

  2. Resource Constrained Planning of Multiple Projects with Separable Activities

    NASA Astrophysics Data System (ADS)

    Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya

    In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.

  3. Near-facility environmental monitoring quality assurance project plan

    SciTech Connect

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  4. Evolution of project planning tools in a matrix organization

    SciTech Connect

    Furaus, J.P.; Figueroa-McInteer, C.; McKeever, P.S.; Wisler, D.B.; Zavadil, J.T.

    1996-10-01

    Until recently, the Corporate Construction Program at Sandia was experiencing difficulties in managing projects: poor planning and cost estimating caused schedule and budget problems. The first step taken was a Microsoft {reg_sign} Project schedule that provides a standard template for scheduling individual construction projects. It is broken down according to the life cycle of the project and prevents the project team from leaving out an important item. A WBS (work breakdown structure) dictionary was also developed that describes how capital and operating funds are used to develop, design, construct, equip, and manage projects. We also developed a matrix chart that maps the planning guide against the major types of construction projects at Sandia. The guide, dictionary, and matrix chart offer enough flexibility that the project manager can make choices about how to structure work, yet ensure that all work rolls up to the cost categories and key DOE WBS elements. As requirements change, the tools can be updated; they also serve as training tools for new project team members.

  5. NASCOM system development plan: System description, capabilities, and plans, FY 94-2

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.

  6. SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT PROJECT.

    ERIC Educational Resources Information Center

    BOICE, JOHN,; AND OTHERS

    ONE-HUNDRED MANUFACTURERS EXPRESSED INTEREST IN BIDDING FOR A SYSTEM ON SCHOOL CONSTRUCTION CALLED SCSD OR SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT TO THE FIRST CALIFORNIA COMMISSION ON SCHOOL CONSTRUCTION SYSTEMS. TWENTY-TWO BUILDINGS COMPRISED THE PROJECT. THE OBJECTIVE WAS TO DEVELOP AN INTEGRATED SYSTEM OF STANDARD SCHOOL BUILDING COMPONENTS…

  7. Wildlife Protection, Mitigation, and Enhancement Plan, Palisades Project: Final Report.

    SciTech Connect

    Meuleman, G. Allyn

    1986-11-01

    Under direction of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 and the subsequent Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, projects have been developed in Idaho and Wyoming to mitigate the losses of wildlife habitat and annual production due to the development and operation of the Palisades Project. A modified Habitat Evaluation Procedure (HEP) was used to assess the benefits of the preferred mitigation plan to wildlife. The interagency work group used the target species Habitat Units (HU's) lost with inundation of the reservoir area as a guideline during the mitigation planning process, while considering needs of wildlife in eastern Idaho and western Wyoming. A total of 37,068 HU's were estimated to be lost as a result of the inundation of the Palisades Reservoir area. Through a series of protection/enhancement projects, the preferred mitigation plan will provide benefits of an estimated 37,066 HU's. Target species to be benefited by this mitigation plan include bald eagle, mule deer, elk, mallard, Canada goose, mink, yellow warbler, black-capped chickadee, ruffed grouse, and peregrine falcon.

  8. Work plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Not Available

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  9. 12. DETAILS NO. 1. Vasona Light Rail Project, Asbuilt Plan, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. DETAILS NO. 1. Vasona Light Rail Project, As-built Plan, Diridon Station Water Tank. Tank Elevation, Foundation Plan, Framing Plan, all at 1:50, and a Section at 1:5. Drawing no. SD701, submitted by Biggs Cardosa Associates, Inc., 1871 The Alameda, Suite 200, San Jose, California. Contract no. C326, CADD file 326SD701. Stamped by Roy. Schnabel, California registered professional engineer no. C46828. - Southern Pacific Depot, Water Tower, 65 Cahill Street, San Jose, Santa Clara County, CA

  10. Sampling and Analysis Plan - Waste Treatment Plant Seismic Boreholes Project

    SciTech Connect

    Reidel, Steve P.

    2006-05-26

    This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the basalt, up to three new deep rotary boreholes through the basalt and sedimentary interbeds, and one corehole through the basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities.

  11. HEDR model validation plan. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Napier, B.A.; Gilbert, R.O.; Simpson, J.C.; Ramsdell, J.V. Jr.; Thiede, M.E.; Walters, W.H.

    1993-06-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project has developed a set of computational ``tools`` for estimating the possible radiation dose that individuals may have received from past Hanford Site operations. This document describes the planned activities to ``validate`` these tools. In the sense of the HEDR Project, ``validation`` is a process carried out by comparing computational model predictions with field observations and experimental measurements that are independent of those used to develop the model.

  12. 244-CR Vault Interim Stabilization Project Plan

    SciTech Connect

    PARKMAN, D.B.

    2000-04-25

    The 244-CR Vault is a two-level, multi-cell structure of reinforced concrete constructed below grade. The lower cell contains four individual compartments, each containing a steel process storage tank and equipped with a concrete sump. The upper cell contains the piping and support equipment, and has two compartments for each of the tanks. The ''pump pit'' is accessed by the removal of concrete cover blocks, while the smaller ''riser pit'' is accessed by steel cover plates. The facility most recently was used as a double-contained receiver tank (DCRT). A DCRT is a type of waste transfer tank that together with its related equipment constitutes a short-term storage area for liquid waste and has a pump pit for waste transfer operations. This vault most recently was used for short-term storage and waste routing for saltwell liquid pumped from the 241-C Tank Farm in the 200 East Area. Waste transfer lines are connected inside the pump pit by a jumper installed between connecting nozzles. An active ventilation system is in operation at the 244-CR vault. Ventilation supply air enters the upper vault section through an inlet header with some leakage through the spaces between the cell cover blocks. The upper and lower vaults are connected by exhauster ports, which allow airflow between the two sections. Normal flow moves air from the upper cell to the lower cell where it is removed and routed into a filter plenum; there the air is treated by a bank of four prefilters and two banks of high-efficiency particulate air (HEPA) filters (each containing four HEPAs). The air is exhausted to the atmosphere through the 296-C-05 Stack. The stack is equipped with a record sampler and continuous air monitor. Two fans (each rated at 4,200 cubic feet per minute) installed downstream of the filtration system provide the motive force for exhausting the vaults and the tanks. As an active system, it is operated continuously with only one of the two fans required to operate at a time. A

  13. Draft test plan for hydrogen getters project

    SciTech Connect

    Mroz, G.; Weinrach, J.

    1998-04-01

    Hydrogen levels in many transuranic (TRU) waste drums are above the compliance threshold, therefore deeming the drums non-shippable to the Waste Isolation Pilot Plant (WIPP). Hydrogen getters (alkynes and dialkynes) are known to react irreversibly with hydrogen in the presence of certain catalysts. The primary purpose of this investigation is to ascertain the effectiveness of a hydrogen getter in an environment that contains gaseous compounds commonly found in the headspace of drums containing TRU waste. It is not known whether the volatile organic compounds (VOCs) commonly found in the headspace of TRU waste drums will inhibit (poison) the effectiveness of the hydrogen getter. The results of this study will be used to assess the feasibility of a hydrogen-getter system, which is capable of removing hydrogen from the payload containers or the Transuranic Package Transporter-II (TRUPACT-II) inner containment vessel to increase the quantity of TRU waste that can be shipped to the WIPP.

  14. Oregon Wildlife Planning Coordination Project, October 1, 1998 to September 30, 1999 Annual Report.

    SciTech Connect

    Barnes, Susan P.

    1999-10-05

    The intent of the Oregon Wildlife Planning Coordination project is to fund Oregon Department of Fish and Wildlife (ODFW) staff to facilitate wildlife mitigation coordination and planning between Oregon wildlife managers. The primary goal of ODFW wildlife mitigation planning/coordination staff is to foster, facilitate, and manage a statewide cooperative wildlife mitigation planning and implementation effort between the Oregon wildlife managers (the Oregon Wildlife Coalition or OWC) to mitigate for wildlife losses in Oregon caused by the development and operation of the hydropower system.

  15. Project Records Information System (PRIS)

    SciTech Connect

    Smith, P.S.; Schwarz, R.K.

    1990-11-01

    The Project Records Information System (PRIS) is an interactive system developed for the Information Services Division (ISD) of Martin Marietta Energy Systems, Inc., to perform indexing, maintenance, and retrieval of information about Engineering project record documents for which they are responsible. This PRIS User's Manual provides instruction on the use of this system. This manual presents an overview of PRIS, describing the system's purpose; the data that it handles; functions it performs; hardware, software, and access; and help and error functions. This manual describes the interactive menu-driven operation of PRIS. Appendixes A, B, C, and D contain the data dictionary, help screens, report descriptions, and a primary menu structure diagram, respectively.

  16. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    SciTech Connect

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  17. User computer system pilot project

    SciTech Connect

    Eimutis, E.C.

    1989-09-06

    The User Computer System (UCS) is a general purpose unclassified, nonproduction system for Mound users. The UCS pilot project was successfully completed, and the system currently has more than 250 users. Over 100 tables were installed on the UCS for use by subscribers, including tables containing data on employees, budgets, and purchasing. In addition, a UCS training course was developed and implemented.

  18. Environmentally Sound Small-Scale Agricultural Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Mohonk Trust, New Paltz, NY.

    This publication is the first of a series of manuals that present environmental guidelines for planning and implementing ecologically sustainable projects. Attention is particularly directed to the agricultural situation and needs of developing nations. Subject areas discussed include: (1) users and uses (identifying the major purposes of the…

  19. 7 CFR 1150.117 - Plans and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 9 2014-01-01 2013-01-01 true Plans and projects. 1150.117 Section 1150.117 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MILK), DEPARTMENT OF AGRICULTURE DAIRY PROMOTION PROGRAM Dairy Promotion and...

  20. 7 CFR 1150.117 - Plans and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Plans and projects. 1150.117 Section 1150.117 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Milk), DEPARTMENT OF AGRICULTURE DAIRY PROMOTION PROGRAM Dairy Promotion and...

  1. The Community Service Fellowship Planning Project: Final Report.

    ERIC Educational Resources Information Center

    McKee, Robert L.; Gaffney, Michael J.

    This report describes the findings and recommendations of the Community Service Fellowship (CSF) Planning Project conducted by the American Association of Community and Junior Colleges under a grant from ACTION, the federal agency charged with promoting volunteer service. The proposed CSF program is a means of providing young people with…

  2. 14. PROJECT PLAN, INTAKE PIER, RAW WATER CONDUITS, PUMPING STATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. PROJECT PLAN, INTAKE PIER, RAW WATER CONDUITS, PUMPING STATION FORCE MAINS, TREATED WATER PIPELINES, AND FILTRATION PLANT, SHEET 1 OF 117, 1920. - Sacramento River Water Treatment Plant Intake Pier & Access Bridge, Spanning Sacramento River approximately 175 feet west of eastern levee on river; roughly .5 mile downstream from confluence of Sacramento & American Rivers, Sacramento, Sacramento County, CA

  3. 7 CFR 1215.15 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Programs, plans, and projects. 1215.15 Section 1215.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  4. 7 CFR 1260.126 - Plans and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Plans and projects. 1260.126 Section 1260.126 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE BEEF PROMOTION AND RESEARCH...

  5. 7 CFR 1230.17 - Plans and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Plans and projects. 1230.17 Section 1230.17 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE PORK PROMOTION, RESEARCH,...

  6. 7 CFR 1215.15 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Programs, plans, and projects. 1215.15 Section 1215.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  7. 7 CFR 1217.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Programs, plans, and projects. 1217.21 Section 1217.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  8. 7 CFR 1230.17 - Plans and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Plans and projects. 1230.17 Section 1230.17 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE PORK PROMOTION, RESEARCH,...

  9. 7 CFR 1219.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Programs, plans, and projects. 1219.21 Section 1219.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  10. 7 CFR 1250.314 - Plans and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Plans and projects. 1250.314 Section 1250.314 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... research, consumer and producer education, advertising, marketing, product development, and promotion...

  11. 7 CFR 1260.126 - Plans and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Plans and projects. 1260.126 Section 1260.126 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE BEEF PROMOTION AND RESEARCH...

  12. 7 CFR 1150.117 - Plans and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 9 2012-01-01 2012-01-01 false Plans and projects. 1150.117 Section 1150.117 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Milk), DEPARTMENT OF AGRICULTURE DAIRY PROMOTION PROGRAM Dairy Promotion and...

  13. 7 CFR 1219.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans, and projects. 1219.21 Section 1219.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  14. 7 CFR 1219.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Programs, plans, and projects. 1219.21 Section 1219.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  15. 7 CFR 1260.126 - Plans and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Plans and projects. 1260.126 Section 1260.126 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE BEEF PROMOTION AND RESEARCH...

  16. 7 CFR 1217.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Programs, plans, and projects. 1217.21 Section 1217.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  17. 7 CFR 1214.15 - Programs, plans and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans and projects. 1214.15 Section 1214.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE CHRISTMAS TREE...

  18. 7 CFR 1214.15 - Programs, plans and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Programs, plans and projects. 1214.15 Section 1214.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE CHRISTMAS TREE...

  19. 7 CFR 1250.314 - Plans and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Plans and projects. 1250.314 Section 1250.314 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... research, consumer and producer education, advertising, marketing, product development, and promotion...

  20. 7 CFR 1219.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Programs, plans, and projects. 1219.21 Section 1219.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  1. 7 CFR 1217.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans, and projects. 1217.21 Section 1217.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  2. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans, and projects. 1215.40 Section 1215.40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POPCORN PROMOTION, RESEARCH, AND CONSUMER...

  3. 7 CFR 1250.314 - Plans and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Plans and projects. 1250.314 Section 1250.314 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE EGG RESEARCH AND PROMOTION Egg Research and Promotion...

  4. 7 CFR 1215.15 - Programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans, and projects. 1215.15 Section 1215.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  5. 7 CFR 1230.17 - Plans and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Plans and projects. 1230.17 Section 1230.17 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE PORK PROMOTION, RESEARCH,...

  6. 7 CFR 1215.15 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Programs, plans, and projects. 1215.15 Section 1215.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  7. 7 CFR 1260.126 - Plans and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Plans and projects. 1260.126 Section 1260.126 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE BEEF PROMOTION AND RESEARCH...

  8. 7 CFR 1150.117 - Plans and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 9 2011-01-01 2011-01-01 false Plans and projects. 1150.117 Section 1150.117 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Milk), DEPARTMENT OF AGRICULTURE DAIRY PROMOTION PROGRAM Dairy Promotion and...

  9. 7 CFR 1215.15 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Programs, plans, and projects. 1215.15 Section 1215.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  10. 7 CFR 1230.17 - Plans and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Plans and projects. 1230.17 Section 1230.17 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE PORK PROMOTION, RESEARCH,...

  11. 7 CFR 1230.17 - Plans and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Plans and projects. 1230.17 Section 1230.17 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE PORK PROMOTION, RESEARCH,...

  12. 7 CFR 1250.314 - Plans and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Plans and projects. 1250.314 Section 1250.314 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... research, consumer and producer education, advertising, marketing, product development, and promotion...

  13. 7 CFR 1221.121 - Programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans, and projects. 1221.121 Section 1221.121 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SORGHUM PROMOTION, RESEARCH, AND INFORMATION ORDER...

  14. 7 CFR 1219.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Programs, plans, and projects. 1219.21 Section 1219.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  15. 7 CFR 1214.15 - Programs, plans and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Programs, plans and projects. 1214.15 Section 1214.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE CHRISTMAS TREE...

  16. 7 CFR 1260.126 - Plans and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Plans and projects. 1260.126 Section 1260.126 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE BEEF PROMOTION AND RESEARCH...

  17. 7 CFR 1250.314 - Plans and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Plans and projects. 1250.314 Section 1250.314 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... research, consumer and producer education, advertising, marketing, product development, and promotion...

  18. 7 CFR 1212.60 - Programs, plans and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Programs, plans and projects. 1212.60 Section 1212.60 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE HONEY PACKERS AND IMPORTERS RESEARCH, PROMOTION,...

  19. Underground Test Area Subproject Project Management Plan, Revision 1

    SciTech Connect

    1998-06-03

    This Project Management Plan (PMP) describes the manner in which the US Department of Energy Nevada Operations Office (DOE/NV) will manage the Underground Test Area (UGTA) Subproject at the Nevada Test Site (NTS). It provides the basic guidance for implementation and the organizational structure for meeting the UGTA objectives.

  20. Environmentally Sound Small-Scale Forestry Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Ffolliott, Peter F.; Thames, John L.

    This manual, the third in a series of publications that address community development possibilities in developing nations, provides guidelines for small-scale forestry projects that are integrative and conservation-oriented. Chapters focus on: (1) users and uses (specifying targeted audience and general objectives); (2) planning process (including…

  1. QUALITY ASSURANCE PROJECT PLAN: 1991 EMAP WETLANDS SOUTHEASTERN PILOT STUDY

    EPA Science Inventory

    Quality Assurance (QA) methodology, as set forth in this plan is used to insure the QA objectives of the study are met. ll participants must be impressed from the beginning with importance of maintaining a commitment to quality throughout the project. raining field personnel is a...

  2. WATERSHED MANIPULATION PROJECT: FIELD IMPLEMENTATION PLAN FOR 1986-1989

    EPA Science Inventory

    The Field Implementation Plan (FIP) of the Watershed Manipulation Project (WMP) has been developed for the Bear Brook Watershed in Maine (BBWM). This document provides details on field activities for site and task groups for the period 1986 to October 1989. pecific objectives of ...

  3. 7 CFR 1217.60 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Programs, plans, and projects. 1217.60 Section 1217.60 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  4. 7 CFR 1217.60 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Programs, plans, and projects. 1217.60 Section 1217.60 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  5. 7 CFR 1217.60 - Programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans, and projects. 1217.60 Section 1217.60 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  6. Environmentally Sound Small-Scale Energy Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Bassan, Elizabeth Ann; Wood, Timothy S., Ed.

    This manual is the fourth volume in a series of publications that provide information for the planning of environmentally sound small-scale projects. Programs that aim to protect the renewable natural resources that supply most of the energy used in developing nations are suggested. Considerations are made for physical environmental factors as…

  7. 78 FR 63481 - Therapeutic Area Standards Initiative Project Plan; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... exchange of regulated study data, and (2) issuing a notice in the August 14, 2012 Federal Register (77 FR... process for drugs and biologics. The TA Project Plan will be updated annually and made available for... develop and implement TA standards to support the regulatory review process for drugs and...

  8. Electric utility system planning studies for OTEC power integration

    NASA Astrophysics Data System (ADS)

    1980-11-01

    The integration of OTEC into the Florida Power Corporation (FTC) system was evaluated. Existing system planning procedures, assumptions, and corporate financial criteria for planning generating capacity were used without modification. A baseline configuration for an OTEC plant was developed for review with standard planning procedures. The OTEC plant characteristics and costs were incorporated in considerable detail. It was found that with the initial set of conditions, OTEC would not be economically viable. Using the same system planning procedures, a number of adjustments were made to the key study assumptions. It was found that two considerations dominate the analysis: the assumed rate of fuel cost escalation, and the projected capital cost of the OTEC plant. After corporate financial analysis, it was found that even if the cost competitive criterion were to be reached, the plan including OTEC could not be financed by FPC.

  9. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    SciTech Connect

    MERCADO, L.C.

    2000-04-22

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects.

  10. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Carl Wharton; Kent Norris

    2009-12-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  11. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Carl Wharton; Kent Norris

    2010-03-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  12. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Carl Wharton

    2009-10-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  13. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  14. PV large systems project

    NASA Technical Reports Server (NTRS)

    Leonard, S. L.

    1982-01-01

    Near term photovoltaic central-station markets are analyzed. Cost effectiveness of photovoltaic plants is determined in terms of reduction of oil consumption. The breakeven photovoltaic system cost vs oil-steam power generation is given. The value of photovoltaic power plants in Southern California and in Los Angelos is given in terms of fuel savings and capacity value. The potential value of third party financing, facilitated by Federal and state tax incentives is analyzed.

  15. UMTRA project technical assistance contractor quality assurance implementation plan

    SciTech Connect

    Not Available

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

  16. Quinault Indian Nation Comprehensive Biomass Strategic Planning Project

    SciTech Connect

    Cardenas, Jesus

    2015-03-31

    The overall purposes of the Quinault Indian Nation’s Comprehensive Biomass Strategic Planning Project were to: (1) Identify and confirm community and tribal energy needs; (2) Conducting an inventory of sustainable biomass feedstock availability; (3) Development of a biomass energy vision statement with goals and objectives; (4) Identification and assessment of biomass options for both demand-side and supply side that are viable to the Quinault Indian Nation (QIN); and (5) Developing a long-term biomass strategy consistent with the long-term overall energy goals of the QIN. This Comprehensive Biomass Strategic Planning Project is consistent with the QIN’s prior two-year DOE Renewable Energy Study from 2004 through 2006. That study revealed that the most viable options to the QIN’s renewable energy options were biomass and energy efficiency best practices. QIN's Biomass Strategic Planning Project is focused on using forest slash in chipped form as feedstock for fuel pellet manufacturing in support of a tribal biomass heating facility. This biomass heating facility has been engineered and designed to heat existing tribal facilities as well as tribal facilities currently being planned including a new K-12 School.

  17. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    2000-12-06

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

  18. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    SciTech Connect

    HOLSTEIN, W.A.

    1999-08-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  19. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    SciTech Connect

    MCGRATH, G.M.

    2000-06-21

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  20. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    SciTech Connect

    Not Available

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made.

  1. Incorporating climate change projections into riparian restoration planning and design

    USGS Publications Warehouse

    Perry, Laura G.; Lindsay V. Reynolds; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  2. Intermediate evaluation of USAID/Cairo energy policy planning project

    SciTech Connect

    Wilbanks, T.J.; Wright, S.B. ); Barron, W.F. ); Kamel, A.M. ); Santiago, H.T. )

    1992-01-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an intermediate evaluation'' of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  3. Intermediate evaluation of USAID/Cairo energy policy planning project

    SciTech Connect

    Wilbanks, T.J.; Wright, S.B.; Barron, W.F.; Kamel, A.M.; Santiago, H.T.

    1992-09-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an ``intermediate evaluation`` of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  4. 327 Building liquid waste handling options modification project plan

    SciTech Connect

    Ham, J.E.

    1998-03-28

    This report evaluates the modification options for handling radiological liquid waste (RLW) generated during decontamination and cleanout of the 327 Building. The overall objective of the 327 Facility Stabilization Project is to establish a passively safe and environmentally secure configuration of the 327 Facility. The issue of handling of RLW from the 327 Facility (assuming the 34O Facility is not available to accept the RLW) has been conceptually examined in at least two earlier engineering studies (Parsons 1997a and Hobart l997). Each study identified a similar preferred alternative that included modifying the 327 Facility RLWS handling systems to provide a truck load-out station, either within the confines of the facility or exterior to the facility. The alternatives also maximized the use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes. An issue discussed in each study involved the anticipated volume of the RLW stream. Estimates ranged between 113,550 and 387,500 liters in the earlier studies. During the development of the 324/327 Building Stabilization/Deactivation Project Management Plan, the lower estimate of approximately 113,550 liters was confirmed and has been adopted as the baseline for the 327 Facility RLW stream. The goal of this engineering study is to reevaluate the existing preferred alternative and select a new preferred alternative, if appropriate. Based on the new or confirmed preferred alternative, this study will also provide a conceptual design and cost estimate for required modifications to the 327 Facility to allow removal of RLWS and treatment of the RLW generated during deactivation.

  5. Intelligent transportation systems strategic plan: Phase 1 report

    SciTech Connect

    1998-05-01

    This interim report on an Intelligent Transportation Systems (ITS) Strategic Plan has been developed as documentation of the process of offering a vision for ITS and recommending an outline for organizational structure, infrastructure, and long-term planning for ITS in Kentucky. This plan provides an overview of the broad scope of ITS and relationships between various Intelligent Vehicle Highway Systems (IVHS) functional areas and ITS user service areas. Three of the functional areas of ITS have been addressed in this interim report with sections devoted to mission, vision, goals, and potential technology applications. Within each of the three areas, recommendations have been made for applications and technologies for deployment. A more formalized business plan for ITS will be developed to recommend specific projects for implementation. Those three functional areas are: (1) Advanced Rural Transportation Systems (ARTS), (2) Advanced Traveler Information Systems (ATIS), and (3) Commercial Vehicle Operations (CVO).

  6. 42 CFR 59.5 - What requirements must be met by a family planning project?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What requirements must be met by a family planning... GRANTS GRANTS FOR FAMILY PLANNING SERVICES Project Grants for Family Planning Services § 59.5 What requirements must be met by a family planning project? (a) Each project supported under this part must:...

  7. Tank waste remediation system environmental program plan

    SciTech Connect

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  8. School Planning, Evaluation and Communication System (SPECS).

    ERIC Educational Resources Information Center

    Flocco, Edward C.

    A comprehensive school planning tool is available from General Learning Corporation and the Center for the Advanced Study of Educational Administration at the University of Oregon. This School Planning, Evaluation and Communication System (SPECS) provides a deliverable system of training, implementation strategies and materials and technical…

  9. Ocean energy systems: Multiyear program plan

    NASA Astrophysics Data System (ADS)

    1980-05-01

    Specific planned activities to be conducted by the Department of Energy in connection with the Ocean Energy System Program for FY 1979 through FY 1984 are described. Program funding is presently 95 percent OTEC, with 5 percent directed toward alternate energy sources such as salinity gradients waves and currents, technical status, ocean energy systems resource requirements, issues, and a management plan are discussed.

  10. Customer-focused planning: Demonstration project summaries. Final report

    SciTech Connect

    George, S.S.

    1992-12-01

    To succeed in the increasingly competitive and dynamic markets in which they operate, electric utilities are focusing ever greater attention on understanding and meeting customer needs. EPRI`s Customer Focused Planning (CFP) project was established to develop concepts and tools that will help utilities enhance their commitment to customer service. The project team conducted a series of interviews and meetings with participating utilities to collaboratively implement crucial steps in the CFP process. Although there is no unique set of tools or single management approach for improving product and service delivery, customer-focused companies have at least five ideals in common. They (1) define goals and objectives in concrete terms, (2) extend the planning boundaries of the organization to include all members of the energy services infrastructure, (3) painstakingly link functional activities directly to customer needs, (4) incorporate the customer`s voice in new product/ service design, and (5) align performance measures with customer needs. In addition, customer-focused companies use a variety of methods to improve customer satisfaction and company performance. These methods include conducting market research, developing market processes such as demand-side management contracting or bidding to reveal customer preferences, and involving customers more directly in the planning process. This report summarizes two brief demonstration projects conducted as part of EPRI`s CFP project, one at Commonwealth Edison Company (CECo) and one at PSI Energy. The CECo project emphasized developing customer-focused performance measures for telephone inquiries. The PSI Energy project involved a one-day workshop underscoring two important CFP elements-understanding customer wants and explicitly linking those wants to utility activities.

  11. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    SciTech Connect

    Not Available

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  12. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Not Available

    1992-10-01

    The Uranium Mill Tallings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1 (Chapter 3, paragraph 2). The UMTRA EPIP covers the time period of November 9, 1992, through November 8, 1993. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  13. Software Configuration Management Plan for the B-Plant Canyon Ventilation Control System

    SciTech Connect

    MCDANIEL, K.S.

    1999-08-31

    Project W-059 installed a new B Plant Canyon Ventilation System. Monitoring and control of the system is implemented by the Canyon Ventilation Control System (CVCS). This Software Configuration Management Plan provides instructions for change control of the CVCS.

  14. Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Wilson, Charmaine V.

    2012-01-01

    Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…

  15. UMTRA project water sampling and analysis plan, Maybell, Colorado

    SciTech Connect

    Not Available

    1994-06-01

    This water sampling and analysis plan (WSAP) describes planned water sampling activities and provides the regulatory and technical basis for ground water sampling in 1994 at the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Maybell, Colorado. The WSAP identifies and justifies sampling locations, analytical parameters, and sampling frequencies at the site. The ground water data will be used for site characterization and risk assessment. The regulatory basis for the ground water and surface water monitoring activities is derived from the EPA regulations in 40 CFR Part 192 (1993) and the proposed EPA standards of 1987 (52 FR 36000). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. This WSAP also includes a summary and the results of water sampling activities from 1989 through 1992 (no sampling was performed in 1993).

  16. 13. DETAIL NO. 2. Vasona Light Rail Project, Asbuilt Plan, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. DETAIL NO. 2. Vasona Light Rail Project, As-built Plan, Diridon Station Water Tank. Interior and Exterior Column Details, all at 1:5. Drawing no. SD702, submitted by Biggs Cardosa Associates, Inc., 1871 The Alameda, Suite 200, San Jose, California. Contract no. C326, CADD file 326SD702. Stamped by Roy M. Schnabel, California registered professional engineer no. C46828. - Southern Pacific Depot, Water Tower, 65 Cahill Street, San Jose, Santa Clara County, CA

  17. 46 CFR 162.060-36 - Quality Assurance Project Plan (QAPP) requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Quality Assurance Project Plan (QAPP) requirements. 162.060-36 Section 162.060-36 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-36 Quality...

  18. Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

    SciTech Connect

    Millard, W. David; Johnson, Daniel M.; Henderson, John M.; Lombardo, Nicholas J.; Bass, Robert B.; Smith, Jason E.

    2014-07-28

    Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedback during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.

  19. IBM PC/IX operating system evaluation plan

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros

    1984-01-01

    An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.

  20. Enroute flight planning: The design of cooperative planning systems

    NASA Technical Reports Server (NTRS)

    Smith, Philip J.; Layton, Chuck; Mccoy, Elaine

    1990-01-01

    Design concepts and principles to guide in the building of cooperative problem solving systems are being developed and evaluated. In particular, the design of cooperative systems for enroute flight planning is being studied. The investigation involves a three stage process, modeling human performance in existing environments, building cognitive artifacts, and studying the performance of people working in collaboration with these artifacts. The most significant design concepts and principles identified thus far are the principle focus.

  1. Project 'VOLCANO': Electronics of tethered satellite system

    NASA Astrophysics Data System (ADS)

    Savich, N. A.

    The main goal of the 'VOLCANO' project developed jointly by the Institute of Radio Engineering and Electronics and space concern 'ENERGIA' is experimental investigation of the current-voltage characteristics of the 'Collector-Boom-Emitter' system simulating the long Tethered Satellite System (TSS) in the real space flight conditions on the transport ship 'PROGRESS'. These measurements will allow scientists to determine the attainable current values for different combinations of collectors and emitters (passive metallic sphere, thermocathode, hollow cathodes and show up some prospects of active TSS. The report is concerned with the concept, purpose and tasks of the project, the planned set up of the measurement equipment on the 'PROGRESS' ship and in the container extended on the deployable 100 m long boom end.

  2. Near Facility Environmental Monitoring Quality Assurance Project Plan

    SciTech Connect

    MCKINNEY, S.M.

    2000-05-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards.

  3. 242-A evaporator quality assurance project plan: Revision 1

    SciTech Connect

    Tucker, B.J.

    1994-11-04

    The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal.

  4. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    SciTech Connect

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  5. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    SciTech Connect

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  6. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  7. IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

  8. OCRWM Systems Engineering Management Plan (SEMP). Revision 3

    SciTech Connect

    Not Available

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.

  9. Strategic Plan for the Coordinated Intermountain Restoration Project

    USGS Publications Warehouse

    Pyke, David A.; Pellant, Michael L.

    2002-01-01

    management agencies within the region. U.S. Geological Survey funds will support (1) continued development of VegSpec, a computer program that is a restoration expert system, (2) research to examine changes in ecosystem processes when native plant-dominated communities shift to communities dominated by exotic annual grasses, and (3) research to address mechanisms for establishing native plants in locations dominated by exotic annual grasses. Through these initial funds, USGS hopes to leverage additional research with other agencies (e.g., BLM?s Great Basin Restoration Initiative or the Native Plant Materials Development Project, which is an interagency program to supply and manage native plant materials for restoration and rehabilitation on Federal lands) or funding organizations (e.g., the U.S. Department of Agriculture?s [USDA] National Research Initiative Competitive Grants Program, or the USDA?s and U.S. Department of the Interior?s [USDOI] Joint Fire Science Program), and to obtain additional research partners (e.g., university or Federal scientists) willing to expand this effort to address all aspects of this strategic plan.

  10. Tracking and data system support for the Pioneer project. Volume 1: Pioneer 10-prelaunch planning through second trajectory correction, 4 December 1969 - 1 April 1972

    NASA Technical Reports Server (NTRS)

    Siegmeth, A. J.; Purdue, R. E.; Ryan, R. E.

    1973-01-01

    The tracking and data system support of the launch, near-earth, and deep space phases of the Pioneer 10 mission, which sent a Pioneer spacecraft into a flyby of Jupiter that would eventually allow the spacecraft to escape the solar system is discussed. The support through the spacecraft's second trajectory correction is reported. During this period, scientific instruments aboard the spacecraft registered information relative to interplanetary particles and fields, and radiometric data generated by the network continued to improve knowledge of the celestial mechanics of the solar system. In addition to network support activity detail, network performance and special support activities are covered.

  11. UMTRA project water sampling and analysis plan, Gunnison, Colorado

    SciTech Connect

    Not Available

    1994-06-01

    This water sampling and analysis plan summarizes the results of previous water sampling activities and the plan for water sampling activities for calendar year 1994. A buffer zone monitoring plan is included as an appendix. The buffer zone monitoring plan is designed to protect the public from residual contamination that entered the ground water as a result of former milling operations. Surface remedial action at the Gunnison Uranium Mill Tailings Remedial Action Project site began in 1992; completion is expected in 1995. Ground water and surface water will be sampled semiannually in 1994 at the Gunnison processing site (GUN-01) and disposal site (GUN-08). Results of previous water sampling at the Gunnison processing site indicate that ground water in the alluvium is contaminated by the former uranium processing activities. Background ground water conditions have been established in the uppermost aquifer (Tertiary gravels) at the Gunnison disposal site. The monitor well locations provide a representative distribution of sampling points to characterize ground water quality and ground water flow conditions in the vicinity of the sites. The list of analytes has been modified with time to reflect constituents that are related to uranium processing activities and the parameters needed for geochemical evaluation. Water sampling will be conducted at least semiannually during and one year following the period of construction activities, to comply with the ground water protection strategy discussed in the remedial action plan (DOE, 1992a).

  12. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  13. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan. Revised

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  14. The Archimedes 2 mechanical assembly planning system

    SciTech Connect

    Kaufman, S.G.; Wilson, R.H.; Jones, R.E.; Calton, T.L.; Ames, A.L.

    1996-03-01

    We describe the implementation and performance of Archimedes 2, an integrated mechanical assembly planning system. Archimedes 2 includes two planners, two assembly sequence animation facilities, and an associated robotic workcell. Both planners use full 3 dimensional data. A rudimentary translator from high level assembly plans to control code for the robotic workcell has also been implemented. We can translate data from a commercial CAD system into input data for the system, which has allowed us to plan assembly sequences for many industrial assemblies. Archimedes 2 has been used to plan sequences for assemblies consisting of 5 to 109 parts. We have also successfully taken a CAD model of an assembly, produced an optimized assembly sequence for it, and translated the plan into robot code, which successfully assembles the device specified in the model.

  15. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    SciTech Connect

    Golder Associates, Inc.

    2003-04-22

    The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a result of

  16. Study to evaluate the effect of EVA on payload systems. Volume 1: Executive summary. [project planning of space missions employing extravehicular activity as a means of cost reduction

    NASA Technical Reports Server (NTRS)

    Patrick, J. W.; Kraly, E. F.

    1975-01-01

    Programmatic benefits to payloads are examined which can result from the routine use of extravehicular activity (EVA) during space missions. Design and operations costs were compared for 13 representative baseline payloads to the costs of those payloads adapted for EVA operations. The EVA-oriented concepts developed in the study were derived from these baseline concepts and maintained mission and program objectives as well as basic configurations. This permitted isolation of cost saving factors associated specifically with incorporation of EVA in a variety of payload designs and operations. The study results were extrapolated to a total of 74 payload programs. Using appropriate complexity and learning factors, net EVA savings were extrapolated to over $551M for NASA and U.S. civil payloads for routine operations. Adding DOD and ESRO payloads increases the net estimated savings of $776M. Planned maintenance by EVA indicated an estimated $168M savings due to elimination of automated service equipment. Contingency problems of payloads were also analyzed to establish expected failure rates for shuttle payloads. The failure information resulted in an estimated potential for EVA savings of $1.9 B.

  17. Information systems to support area planning

    SciTech Connect

    Chow, P.

    1995-12-01

    EPRI has conducted more than $3 million dollars of tailored collaboration research with utilities interested in developing area and time specific (ATS) data for use in planning and pricing. This ATS data has led to a number of data transformation, planning, and pricing tools. British Columbia Hydro (BC Hydro) is among the vanguard of utilities who have contributed to the formation of both data and methods in this new area. Several leading utilities, including BC Hydro, are now beginning to ask how they can transform the data used in their own particular studies to develop internal planning and pricing processes that lower costs and increase margin. This presentation describes a project underway at BC Hydro to harness and apply this information. Other utilities have applied the data in the following ways: Philadelphia Energy Company believes that by changing the capital evaluation standards to require the use of ATS data, they will develop a better local area planning process. Central Power and Light, and Pacific Gas and Electric Company have gained regulatory approval for use of ATS costing and load data in pricing and planning. Niagara Mohawk believes that making the ATS data relatively easy to access and use is the first step towards incorporating the data into their existing utility planning and pricing processes. BC Hydro`s project will accommodate all of these applications and goals, and will also position BC Hydro for a competitive future.

  18. Not planning a sustainable transport system

    SciTech Connect

    Finnveden, Göran Åkerman, Jonas

    2014-04-01

    The overall objective of the Swedish transport policy is to ensure the economically efficient and sustainable provision of transport services for people and business throughout the country. More specifically, the transport sector shall, among other things, contribute to the achievement of environmental quality objectives in which the development of the transport system plays an important role in the achievement of the objectives. The aim of this study is to analyse if current transport planning supports this policy. This is done by analysing two recent cases: the National Infrastructure Plan 2010–2021, and the planning of Bypass Stockholm, a major road investment. Our results show that the plans are in conflict with several of the environmental quality objectives. Another interesting aspect of the planning processes is that the long-term climate goals are not included in the planning processes, neither as a clear goal nor as factor that will influence future transport systems. In this way, the long-term sustainability aspects are not present in the planning. We conclude that the two cases do not contribute to a sustainable transport system. Thus, several changes must be made in the processes, including putting up clear targets for emissions. Also, the methodology for the environmental assessments needs to be further developed and discussed. - Highlights: • Two cases are studied to analyse if current planning supports a sustainable transport system. • Results show that the plans are in conflict with several of the environmental quality objectives. • Long-term climate goals are not included in the planning processes. • Current practices do not contribute to a sustainable planning processes. • Methodology and process for environmental assessments must be further developed and discussed.

  19. Integrated development and testing plan for the plutonium immobilization project

    SciTech Connect

    Kan, T.

    1998-07-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D&T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D&T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D&T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the plutonium

  20. Expert system application education project

    NASA Technical Reports Server (NTRS)

    Gonzelez, Avelino J.; Ragusa, James M.

    1988-01-01

    Artificial intelligence (AI) technology, and in particular expert systems, has shown potential applicability in many areas of operation at the Kennedy Space Center (KSC). In an era of limited resources, the early identification of good expert system applications, and their segregation from inappropriate ones can result in a more efficient use of available NASA resources. On the other hand, the education of students in a highly technical area such as AI requires an extensive hands-on effort. The nature of expert systems is such that proper sample applications for the educational process are difficult to find. A pilot project between NASA-KSC and the University of Central Florida which was designed to simultaneously address the needs of both institutions at a minimum cost. This project, referred to as Expert Systems Prototype Training Project (ESPTP), provided NASA with relatively inexpensive development of initial prototype versions of certain applications. University students likewise benefit by having expertise on a non-trivial problem accessible to them at no cost. Such expertise is indispensible in a hands-on training approach to developing expert systems.

  1. Development of a Planning System for Educational Research and Development Centers.

    ERIC Educational Resources Information Center

    Vivekananthan, P. S.

    A 2-phase project has been undertaken to develop a research and development planning system which consists of (1) a systematic procedure to formulate research projects, and (2) a systematic procedure to guide the selection of a subset of projects. Phase 1 of the project involves the development of a meta model which is based on a modular concept…

  2. A System For Temporal Plan Generation

    NASA Astrophysics Data System (ADS)

    Tirumala, Bharadwaj S.; Hall, Lawrence O.

    1989-03-01

    Temporal reasoning, which is a way of pursuing goals and drawing inferences based on events occurring over time, plays an important role in automated planning systems and in general in common sense reasoning. This work is an attempt at exploring the problems involved in reasoning over time which typically involve updating a plan structure with changing world patterns. This involves developing the appropriate knowledge representation in addition to a plan generation system. A deductive retrieval mechanism, which has been tailored to the needs of temporal retrievals, has been imple-mented. Uncertainty due to incomplete information and indecision is resolved using fuzzy values and a dynamic resolution over a temporal data base. Imprecise temporal information is captured in fuzzy intervals. These intervals are made up of a beginning hour and ending hour. The system can find the tightest possible bounds on a possible event or step in a plan. The system user provides the constraint information for plan development. This is combined with basic domain information in the knowledge base. A plan or set of steps through some temporal constraints will be presented based upon the constraints and domain information. A fuzzy belief in the chance of the plans' success is associated with the information provided by the system.

  3. Sampling and Analysis Plan Waste Treatment Plant Seismic Boreholes Project.

    SciTech Connect

    Brouns, Thomas M.

    2007-07-15

    This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the Saddle Mountains Basalt, up to three new deep rotary boreholes through the Saddle Mountains Basalt and sedimentary interbeds, and one corehole through the Saddle Mountains Basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities. Revision 3 incorporates all interim change notices (ICN) that were issued to Revision 2 prior to completion of sampling and analysis activities for the WTP Seismic Boreholes Project. This revision also incorporates changes to the exact number of samples submitted for dynamic testing as directed by the U.S. Army Corps of Engineers. Revision 3 represents the final version of the SAP.

  4. A review of mission planning systems

    NASA Technical Reports Server (NTRS)

    Jones, M.; Sorensen, E. M.; Wolff, T.; Haddow, C. R.

    1993-01-01

    A general definition of Mission Planning is given. The definition covers the full scope of an end-to-end mission planning system. Noting the mission-specific nature of most mission planning systems, a classification of autonomous spacecraft missions is made into Observatory, Survey, multi-instrument science, and Telecommunications missions. The mission planning approach for one mission in each category is examined critically. The following missions were chosen: ISO (Infrared Space Observatory); ERS-1 (European Remote Sensing Satellite); and Eureca (European Retrievable Carrier). The paper gives a summary of lessons learned from these missions suggesting improvements in areas such as requirements analysis, testing, user interfacing, rules, and constraints handling. The paper will also examine commonalities in functions, which could constitute a basis for identification of generic mission planning support tools.

  5. Environmental monitoring and assessment program forest health monitoring quality assurance project plan for detection monitoring project

    SciTech Connect

    Cline, S.P.; Alexander, S.A.; Barnard, J.E.

    1995-05-01

    The Quality Assurance Project Plan (QAP) is written specifically for the Detection Minitoring project of the interagency Forest Health Monitoring (FHM) program. Sections 1 through 3 briefly explain key features of the Environmental Monitoring and Assessment Program (EMAP), the FHM program, and their interrelationship, respectively. Section 4 describes the general quality assurance (QA) requirements for the FHM Detection Monitoring project. Section 5 contains the separate QAPs for each forest condition indicator: site condition and tree growth and regeneration, tree crown condition, tree damage assessment, photosynthetically active radiation (PAR), vegetation structure, ozone bioindicator plants, and lichen communities.

  6. Up-Stream Dissolved Oxygen TMDL Project Quality Assurance ProjectPlan

    SciTech Connect

    Stringfellow, William T.

    2005-05-13

    A quality assurance project plan (QAPP) for the execution of an ecosystem level monitoring and research program examining algal ecology in highly impaired rivers. Procedures for executing both field and laboratory surface water quality and flow analysis are described. The procedures described here are compatible with the California Surface Water Ambient Monitoring program (SWAMP).

  7. FRG sealed isotopic heat sources project (C-229) project management plan

    SciTech Connect

    Metcalf, I.L.

    1997-05-16

    This Project Management Plan defines the cost, scope, schedule, organizational responsibilities, and work breakdown structure for the removal of the Federal Republic of Germany (FRG) Sealed Isotopic Heat Sources from the 324 Building and placed in interim storage at the Central Waste Complex (CWC).

  8. Environmental planning for oil and gas projects in alliance organizations

    SciTech Connect

    Hanley, P.T.; Campbell, G.R.B.; Wuestenfield, K.S.

    1996-12-31

    Oil companies are increasingly adopting the {open_quotes}alliance{close_quotes} organization to develop innovative engineering solutions to make projects economic in an industry characterized by global opportunities and competition for investment dollars. This structure involves strategic contractual relationships between companies and contractors. On Alaska`s North Slope, BP Exploration (Alaska) Inc. has formed alliances to engineer and develop its Badami and Northstar oil fields. These fields are small in comparison to Prudhoe Bay and Endicott and their economics cannot support high capital and operating costs. Costs, reserves, and permits are the three major building blocks of a successful oil development project. The alliance structure presents some special challenges and opportunities in successfully designing an environmentally sensitive project rd obtaining permits. On the Badami project, permitting has required that alliance members, the regulators, and BPXA environmental personnel develop a mutual understanding and reaction of engineering and environmental constraints and opportunities. Part of the communications challenge has resulted from the differing mandates and boundaries of the alliance and the external requirements of environmental laws and regulations. The lessons learned on Badami have been adopted in environmental planning and permitting the Northstar project.

  9. Air quality and future energy system planning

    NASA Astrophysics Data System (ADS)

    Sobral Mourao, Zenaida; Konadu, Dennis; Lupton, Rick

    2016-04-01

    Ambient air pollution has been linked to an increasing number of premature deaths throughout the world. Projected increases in demand for food, energy resources and manufactured products will likely contribute to exacerbate air pollution with an increasing impact on human health, agricultural productivity and climate change. Current events such as tampering emissions tests by VW car manufacturers, failure to comply with EU Air Quality directives and WHO guidelines by many EU countries, the problem of smog in Chinese cities and new industrial emissions regulations represent unique challenges but also opportunities for regulators, local authorities and industry. However current models and practices of energy and resource use do not consider ambient air impacts as an integral part of the planing process. Furthermore the analysis of drivers, sources and impacts of air pollution is often fragmented, difficult to understand and lacks effective visualization tools that bring all of these components together. This work aims to develop a model that links impacts of air quality on human health and ecosystems to current and future developments in the energy system, industrial and agricultural activity and patterns of land use. The model will be added to the ForeseerTM tool, which is an integrated resource analysis platform that has been developed at the University of Cambridge initially with funding from BP and more recently through the EPSRC funded Whole Systems Energy Modeling (WholeSEM) project. The basis of the tool is a set of linked physical models for energy, water and land, including the technologies that are used to transform these resources into final services such as housing, food, transport and household goods. The new air quality model will explore different feedback effects between energy, land and atmospheric systems with the overarching goal of supporting better communication about the drivers of air quality and to incorporate concerns about air quality into

  10. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  11. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of...

  12. PUREX/UO{sub 3} deactivation project management plan

    SciTech Connect

    Washenfelder, D.J.

    1993-12-01

    From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.

  13. Planning and Evaluating Telecommunications Demonstration Projects and Assessing the Costs of Telecommunications Demonstration Projects. Final Report #146-03.

    ERIC Educational Resources Information Center

    Clippinger, John H.; Fain, Sanford B.

    This two-report volume was prepared to describe approaches for evaluating individual Office of Telecommunications Policy (OTP) demonstration projects in the future and to aid demonstration project directors in project planning and development. The first report focuses on the role of planning and evaluation activities, stressing their importance in…

  14. In-space propellant logistics. Volume 4: Project planning data

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The prephase A conceptual project planning data as it pertains to the development of the selected logistics module configuration transported into earth orbit by the space shuttle orbiter. The data represents the test, implementation, and supporting research and technology requirements for attaining the propellant transfer operational capability for early 1985. The plan is based on a propellant module designed to support the space-based tug with cryogenic oxygen-hydrogen propellants. A logical sequence of activities that is required to define, design, develop, fabricate, test, launch, and flight test the propellant logistics module is described. Included are the facility and ground support equipment requirements. The schedule of activities are based on the evolution and relationship between the R and T, the development issues, and the resultant test program.

  15. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    SciTech Connect

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  16. Planning for an Irrigation System.

    ERIC Educational Resources Information Center

    Turner, J. Howard; Anderson, Carl L.

    The publication, with the aid of tables and colored illustrations and diagrams, presents information to help the farmer who is considering the installation of an irrigation system determine whether or not to irrigate, the type of system to use, and the irrigation cost and return on investment. Information is presented on the increase in yield to…

  17. Modeling studies for planning: The Green Bay project

    SciTech Connect

    Martin, J.L.; Richardson, W.L.; McCutcheon, S.C.

    1991-06-01

    A major contaminant monitoring and modeling study is underway for Green Bay, Lake Michigan. Monitoring programs in support of contaminant modeling of large waterbodies, such as for Green Bay, are expensive and their extent is often limited by budget limitations, laboratory capacity, and logistic constraints. Physical/chemical and food chain models were applied using historical data to aid in project planning by identifying processes having the greatest impact on the predictive capability of mass balance models. Studies were also conducted to estimate errors in computed tributary loadings and in-Bay concentrations and contaminant mass associated with different sampling strategies.

  18. UMTRA Project water sampling and analysis plan, Slick Rock, Colorado

    SciTech Connect

    Not Available

    1994-08-01

    This water sampling and analysis plan (WSAP) provides the regulatory and technical basis for ground water and surface water sampling at the Uranium Mill Tailings Remedial Action (UMTRA) Project Union Carbide (UC) and North Continent (NC) processing sites and the proposed Burro Canyon disposal site near Slick Rock, Colorado for the upcoming year. It identifies and justifies the sampling locations, analytical parameters, and sampling frequencies. The WSAP bridges water quality characterization and data collection objectives for the surface remediation program (Subpart A) and the ground water compliance program (Subpart B) identified in 40 CFR Part 192 (1994).

  19. Quality Assurance Project Plan for waste tank vapor characterization

    SciTech Connect

    Suydam, C.D. Jr.

    1993-12-01

    This Quality Assurance Project Plan, WHC-SD-WM-QAPP-013, applies to four separate vapor sampling tasks associated with Phases 1 and 2 of the Tank Vapor Issue Resolution Program and support of the Rotary Mode Core Drilling Portable Exhauster Permit. These tasks focus on employee safety concerns and tank ventilation emission control design requirements. Previous characterization efforts and studies are of insufficient accuracy to adequately define the problem. It is believed that the technology and maturity of sampling and analytical methods can be sufficiently developed to allow the characterization of the constituents of the tank vapor space.

  20. UMTRA project water sampling and analysis plan -- Shiprock, New Mexico

    SciTech Connect

    Not Available

    1994-02-01

    Water sampling and analysis plan (WSAP) is required for each U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide a basis for ground water and surface water sampling at disposal and former processing sites. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring stations at the Navaho Reservation in Shiprock, New Mexico, UMTRA Project site. The purposes of the water sampling at Shiprock for fiscal year (FY) 1994 are to (1) collect water quality data at new monitoring locations in order to build a defensible statistical data base, (2) monitor plume movement on the terrace and floodplain, and (3) monitor the impact of alluvial ground water discharge into the San Juan River. The third activity is important because the community of Shiprock withdraws water from the San Juan River directly across from the contaminated alluvial floodplain below the abandoned uranium mill tailings processing site.

  1. The Fermilab ISDN Pilot Project: Experiences and future plans

    SciTech Connect

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-12-31

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking.

  2. Satellite services system program plan

    NASA Technical Reports Server (NTRS)

    Hoffman, Stephen J.

    1985-01-01

    The purpose is to determine the potential for servicing from the Space Shuttle Orbiter and to assess NASA's role as the catalyst in bringing about routine on-orbit servicing. Specifically this study seeks to determine what requirements, in terms of both funds and time, are needed to make the Shuttle Orbiter not only a transporter of spacecraft but a servicing vehicle for those spacecraft as well. The scope of this effort is to focus on the near term development of a generic servicing capability. To make this capability truly generic and attractive requires that the customer's point of veiw be taken and transformed into a widely usable set of hardware. And to maintain a near term advent of this capability requires that a minimal reliance be made on advanced technology. With this background and scope, this study will proceed through three general phases to arrive at the desired program costs and schedule. The first step will be to determine the servicing requirements of the user community. This will provide the basis for the second phase which is to develop hardware concepts to meet these needs. Finally, a cost estimate will be made for each of the new hardware concepts and a phased hardware development plan will be established for the acquisition of these items based on the inputs obtained from the user community.

  3. The Effect of Organizational Structure on Planning. A Report of the National Dissemination Project for Community Colleges.

    ERIC Educational Resources Information Center

    Carlson, Dennis; Das, Deb

    Ways in which community college systems might better serve the needs of minority and disadvantaged students through planning are suggested. A number of organizational variables that appeared to affect achievement in 10 previous OEO state planning projects are presented and discussed. The variables are divided into three structural levels: state…

  4. The NASA-Lewis/ERDA solar heating and cooling technology program. [project planning/energy policy

    NASA Technical Reports Server (NTRS)

    Couch, J. P.; Bloomfield, H. S.

    1975-01-01

    Plans by NASA to carry out a major role in a solar heating and cooling program are presented. This role would be to create and test the enabling technology for future solar heating, cooling, and combined heating/cooling systems. The major objectives of the project are to achieve reduction in solar energy system costs, while maintaining adequate performance, reliability, life, and maintenance characteristics. The project approach is discussed, and will be accomplished principally by contract with industry to develop advanced components and subsystems. Advanced hardware will be tested to establish 'technology readiness' both under controlled laboratory conditions and under real sun conditions.

  5. Advanced Coal Conversion Process Demonstration Project. Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1992-04-01

    Western Energy Company (WECO) was selected by the Department of Energy (DOE) to demonstrate the Advanced Coal Conversion Process (ACCP) which upgrades low rank coals into high Btu, low sulfur, synthetic bituminous coal. As specified in the Corporate Agreement, RSCP is required to develop an Environmental Monitoring Plan (EMP) which describes in detail the environmental monitoring activities to be performed during the project execution. The purpose of the EMP is to: (1) identify monitoring activities that will be undertaken to show compliance to applicable regulations, (2) confirm the specific environmental impacts predicted in the National Environmental Policy Act documentation, and (3) establish an information base of the assessment of the environmental performance of the technology demonstrated by the project. The EMP specifies the streams to be monitored (e.g. gaseous, aqueous, and solid waste), the parameters to be measured (e.g. temperature, pressure, flow rate), and the species to be analyzed (e.g. sulfur compounds, nitrogen compounds, trace elements) as well as human health and safety exposure levels. The operation and frequency of the monitoring activities is specified, as well as the timing for the monitoring activities related to project phase (e.g. preconstruction, construction, commissioning, operational, post-operational). The EMP is designed to assess the environmental impacts and the environmental improvements resulting from construction and operation of the project.

  6. 49 CFR 611.7 - Relation to planning and project development processes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with 23 CFR part 450. To be eligible for FTA capital investment funding, a proposed project must be... 49 Transportation 7 2010-10-01 2010-10-01 false Relation to planning and project development... Relation to planning and project development processes. All new start projects proposed for...

  7. 49 CFR 611.7 - Relation to planning and project development processes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with 23 CFR part 450. To be eligible for FTA capital investment funding, a proposed project must be... 49 Transportation 7 2011-10-01 2011-10-01 false Relation to planning and project development... Relation to planning and project development processes. All new start projects proposed for...

  8. As Built Verification Plan for Cask Transportation Facility Modifications (CTFM) Project A.5 and A.6

    SciTech Connect

    LANE, K.I.

    2000-04-20

    This document establishes an As-built Verification Plan (AVP) for implementing requirements in PHMC Engineering Requirements HNF-PRO-1819, Rev. 4, Sections 2.8.3.d and 2.10.8 and Spent Nuclear Fuels (SNF) Project Administrative Procedure EN-6-012-01. This AVP defines and implements approved processes to document the physical configuration of the project scope installed within the facility and identify discrepancies between the associated project engineering drawings and the field configuration, and the component index (CI) database as defined in AP EN 6-005-02. This AVP defines requirements for project activities verifying conformance of structures, systems, and components (SSCs) to project specified requirements.

  9. Lee Hot Springs power project. First topical report management plan

    SciTech Connect

    1996-03-18

    The Lee Hot Springs Project ({open_quotes}the Project{close_quotes}) will use binary cycle turbine-generators supplied by geothermal hot water to make electricity. Two clusters of three (3) 1,000 kilowatt ({open_quotes}kw{close_quotes}) projects, each cluster comprising a {open_quotes}plant,{close_quotes} will use the pumped output of one geothermal well. The plants will tie into Sierra Pacific Power Company`s ({open_quotes}Sierra`s{open_quotes}) transmission system. The Project objectives are designed to demonstrate that geothermal energy is a non-polluting, non-CO{sub 2} emitting form of generation, which if used in larger increments, will significantly reduce the emissions of greenhouse gasses. The Project will also demonstrate the use of modular, {open_quotes}non-grid{close_quotes} or {open_quotes}village{close_quotes} units which can be used throughout the world where geothermal energy is present in remote locations and power is not. The Project was conceived as a 20,000 kw Qualifying Facility, divided into two phases, a 5,000 kw phase one followed by a 15,000 kw phase two. The first phase of the Project now consists of two (2) 3,000 kw plants to generate 6,000 kws.

  10. Ares I Crew Launch Vehicle Project: Forward Plan to Preliminary Design Review

    NASA Technical Reports Server (NTRS)

    Dumbacher, Daniel L.; Reuter, James L.

    2007-01-01

    The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, conducted the Ares I Crew Launch Vehicle System Requirements Review (SRR) at the end of 2006, a mere year after the project team was assembled. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the operability, reliability, and affordability goals outlined by the Constellation Program. As directed in NASA Procedure and Regulation (NPR) 7123, NASA Systems Engineering Procedural Requirements, the Ares I SRR examined "the functional and performance requirements defined for the system and the preliminary program or project plan and ensures that the requirements and the selected concept will satisfy the mission." The SRR was conducted to ensure the system- and element-level design and interface requirements are defined prior to proceeding into the project's design phase. The Exploration Launch Projects Control Board convened on December 19,2006, and accepted the findings of the SRR and the go-forward plan proceeding to PDR. Based upon these findings, the Ares project believes that operability must drive the vehicle's design, and that a number of design challenges, including system mass and reliability, must be addressed as part of the progress to PDR.

  11. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    SciTech Connect

    Hartman, Mary J.; Dresel, P Evan; Lindberg, Jonathan W.; Newcomer, Darrell R.; Thornton, Edward C.

    2000-10-18

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954; the Resource Conservation and Recovery Act of 1976; the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The U.S. Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/ frequency matrix for the entire site. The objectives of monitoring fall into three general categories: plume and trend tracking, treatment/ storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently.

  12. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    SciTech Connect

    Newcomer, D.R.; Thornton, E.C.; Hartman, M.J.; Dresel, P.E.

    1999-10-06

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954 the Resource Conservation and Recovery Act of 1976 the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/frequency matrix for the entire site. The objectives of monitoring fall into three general categories plume and trend tracking, treatment/storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently.

  13. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  14. Intelligent Planning and Scheduling for Controlled Life Support Systems

    NASA Technical Reports Server (NTRS)

    Leon, V. Jorge

    1996-01-01

    Planning in Controlled Ecological Life Support Systems (CELSS) requires special look ahead capabilities due to the complex and long-term dynamic behavior of biological systems. This project characterizes the behavior of CELSS, identifies the requirements of intelligent planning systems for CELSS, proposes the decomposition of the planning task into short-term and long-term planning, and studies the crop scheduling problem as an initial approach to long-term planning. CELSS is studied in the realm of Chaos. The amount of biomass in the system is modeled using a bounded quadratic iterator. The results suggests that closed ecological systems can exhibit periodic behavior when imposed external or artificial control. The main characteristics of CELSS from the planning and scheduling perspective are discussed and requirements for planning systems are given. Crop scheduling problem is identified as an important component of the required long-term lookahead capabilities of a CELSS planner. The main characteristics of crop scheduling are described and a model is proposed to represent the problem. A surrogate measure of the probability of survival is developed. The measure reflects the absolute deviation of the vital reservoir levels from their nominal values. The solution space is generated using a probability distribution which captures both knowledge about the system and the current state of affairs at each decision epoch. This probability distribution is used in the context of an evolution paradigm. The concepts developed serve as the basis for the development of a simple crop scheduling tool which is used to demonstrate its usefulness in the design and operation of CELSS.

  15. GPLAN: A Generalized Data Base Planning System.

    ERIC Educational Resources Information Center

    Nunamaker, J. F., Jr.; And Others

    It is recognized that there is a major gap between the promises of large data bases and optimization and simulation models and their actual ability to solve real world problems. This document describes a Generalized Data Base Planning System (GPLAN), currently being developed at Purdue University, that is proposed as a system to bridge this gap. A…

  16. Progress, status, and plans for the HRIBF project

    SciTech Connect

    Auble, R.L.; Alton, G.D.; Bailey, J.D

    1995-12-31

    Over the last three years, the Holifield accelerator system has been reconfigured into a first-generation radioactive ion beam facility, the HRIBF, a national user facility for RIB research. The construction and reconfiguration have been completed and the equipment commissioning and beam development phases have started. The progress to date, the present status, and future plans will be given. The special problems connected with the production and acceleration of RIBs will be discussed.

  17. UMTRA project water sampling and analysis plan, Monument Valley, Arizona

    SciTech Connect

    Not Available

    1994-04-01

    The Monument Valley Uranium Mill Tailings Remedial Action (UMTRA) Project site in Cane Valley is a former uranium mill that has undergone surface remediation in the form of tailings and contaminated materials removal. Contaminated materials from the Monument Valley (Arizona) UMTRA Project site have been transported to the Mexican Hat (Utah) UMTRA Project site for consolidation with the Mexican Hat tailings. Tailings removal was completed in February 1994. Three geologic units at the site contain water: the unconsolidated eolian and alluvial deposits (alluvial aquifer), the Shinarump Conglomerate (Shinarump Member), and the De Chelly Sandstone. Water quality analyses indicate the contaminant plume has migrated north of the site and is mainly in the alluvial aquifer. An upward hydraulic gradient in the De Chelly Sandstone provides some protection to that aquifer. This water sampling and analysis plan recommends sampling domestic wells, monitor wells, and surface water in April and September 1994. The purpose of sampling is to continue periodic monitoring for the surface program, evaluate changes to water quality for site characterization, and provide data for the baseline risk assessment. Samples taken in April will be representative of high ground water levels and samples taken in September will be representative of low ground water levels. Filtered and nonfiltered samples will be analyzed for plume indicator parameters and baseline risk assessment parameters.

  18. Guidelines for Planning in Colleges and Universities. Volume One, Planning System.

    ERIC Educational Resources Information Center

    Pinnell, Charles; Wacholder, Michael

    This volume outlines a system for effective planning in higher education. The system integrates management and program planning, physical plant planning, and financial planning into a single process designed to support institutional management and decision making at all administrative levels. Because successful planning is a process, procedures…

  19. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study

    SciTech Connect

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie

    2013-11-15

    Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (∼2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ∼2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the

  20. Project W-314 specific test and evaluation plan for AZ tank farm upgrades

    SciTech Connect

    Hays, W.H.

    1998-08-12

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.