Science.gov

Sample records for power line corridor

  1. Remote sensing methods for power line corridor surveys

    NASA Astrophysics Data System (ADS)

    Matikainen, Leena; Lehtomäki, Matti; Ahokas, Eero; Hyyppä, Juha; Karjalainen, Mika; Jaakkola, Anttoni; Kukko, Antero; Heinonen, Tero

    2016-09-01

    To secure uninterrupted distribution of electricity, effective monitoring and maintenance of power lines are needed. This literature review article aims to give a wide overview of the possibilities provided by modern remote sensing sensors in power line corridor surveys and to discuss the potential and limitations of different approaches. Monitoring of both power line components and vegetation around them is included. Remotely sensed data sources discussed in the review include synthetic aperture radar (SAR) images, optical satellite and aerial images, thermal images, airborne laser scanner (ALS) data, land-based mobile mapping data, and unmanned aerial vehicle (UAV) data. The review shows that most previous studies have concentrated on the mapping and analysis of network components. In particular, automated extraction of power line conductors has achieved much attention, and promising results have been reported. For example, accuracy levels above 90% have been presented for the extraction of conductors from ALS data or aerial images. However, in many studies datasets have been small and numerical quality analyses have been omitted. Mapping of vegetation near power lines has been a less common research topic than mapping of the components, but several studies have also been carried out in this field, especially using optical aerial and satellite images. Based on the review we conclude that in future research more attention should be given to an integrated use of various data sources to benefit from the various techniques in an optimal way. Knowledge in related fields, such as vegetation monitoring from ALS, SAR and optical image data should be better exploited to develop useful monitoring approaches. Special attention should be given to rapidly developing remote sensing techniques such as UAVs and laser scanning from airborne and land-based platforms. To demonstrate and verify the capabilities of automated monitoring approaches, large tests in various environments

  2. Urban Power Line Corridors as Novel Habitats for Grassland and Alien Plant Species in South-Western Finland.

    PubMed

    Lampinen, Jussi; Ruokolainen, Kalle; Huhta, Ari-Pekka

    2015-01-01

    Regularly managed electric power line corridors may provide habitats for both early-successional grassland plant species and disturbance-dependent alien plant species. These habitats are especially important in urban areas, where they can help conserve native grassland species and communities in urban greenspace. However, they can also provide further footholds for potentially invasive alien species that already characterize urban areas. In order to implement power line corridors into urban conservation, it is important to understand which environmental conditions in the corridors favor grassland species and which alien species. Likewise it is important to know whether similar environmental factors in the corridors control the species composition of the two groups. We conducted a vegetation study in a 43 kilometer long urban power line corridor network in south-western Finland, and used generalized linear models and distance-based redundancy analysis to determine which environmental factors best predict the occurrence and composition of grassland and alien plant species in the corridors. The results imply that old corridors on dry soils and steep slopes characterized by a history as open areas and pastures are especially suitable for grassland species. Corridors suitable for alien species, in turn, are characterized by productive soils and abundant light and are surrounded by a dense urban fabric. Factors controlling species composition in the two groups are somewhat correlated, with the most important factors including light abundance, soil moisture, soil calcium concentration and soil productivity. The results have implications for grassland conservation and invasive alien species control in urban areas. PMID:26565700

  3. Urban Power Line Corridors as Novel Habitats for Grassland and Alien Plant Species in South-Western Finland

    PubMed Central

    Lampinen, Jussi; Ruokolainen, Kalle; Huhta, Ari-Pekka

    2015-01-01

    Regularly managed electric power line corridors may provide habitats for both early-successional grassland plant species and disturbance-dependent alien plant species. These habitats are especially important in urban areas, where they can help conserve native grassland species and communities in urban greenspace. However, they can also provide further footholds for potentially invasive alien species that already characterize urban areas. In order to implement power line corridors into urban conservation, it is important to understand which environmental conditions in the corridors favor grassland species and which alien species. Likewise it is important to know whether similar environmental factors in the corridors control the species composition of the two groups. We conducted a vegetation study in a 43 kilometer long urban power line corridor network in south-western Finland, and used generalized linear models and distance-based redundancy analysis to determine which environmental factors best predict the occurrence and composition of grassland and alien plant species in the corridors. The results imply that old corridors on dry soils and steep slopes characterized by a history as open areas and pastures are especially suitable for grassland species. Corridors suitable for alien species, in turn, are characterized by productive soils and abundant light and are surrounded by a dense urban fabric. Factors controlling species composition in the two groups are somewhat correlated, with the most important factors including light abundance, soil moisture, soil calcium concentration and soil productivity. The results have implications for grassland conservation and invasive alien species control in urban areas. PMID:26565700

  4. Mapping threats to power line corridors for Connecticut rights-of-way management.

    PubMed

    Poulos, H M; Camp, A E

    2011-02-01

    Trees are a major threat to power line security across forested regions of the world. We developed a decision support system for identifying locations in Connecticut, USA where trees have grown tall enough to make contact with transmission lines during storms. We used the Random Forest algorithm, danger tree presence/absence data, and 25 raster environmental datasets to develop (1) an understanding of the abiotic environmental settings that host danger trees and (2) a spatially explicit map of danger tree distributions across Connecticut power line corridors. Danger trees were prevalent in locations (1) with an infrequent history of storms; (2) forested and residential land uses; and (3) low to middle elevations. Products from this research can be transferred to adaptive right-of-way management because they present managers with key information on where danger trees are likely to occur, and the methods presented herein have great potential for future application to other regions managers seek to identify high priority areas for danger tree removal. PMID:21153640

  5. Reclamation and revegetation along a 250-mile 500 kV power line corridor

    SciTech Connect

    Griffith, E.F.

    1990-12-31

    Reclamation and revegetation success along the Montana Power Company Colstrip to Deepdale 500 kV powerline was monitored from 1985 through 1989. Followup revegetation was hampered by inadequate road and tower site earth work as a result of premature release of the reclamation bond. Drought conditions in 1985 and 1988 seriously affected revegetation efforts, especially on difficult sites. Weed control improved markedly, and all ROW areas are weed free except those next to infested range and cropland where a major cooperative effort is needed to control weeds. Access roads in previously unroaded areas resulted in changes of access, management practices, and cattle grazing behavior, all of which adversely affected revegetation success. Erosion, exacerbated by undersized culverts, the presence of very erodible soils, the occasional untrained contractor, is now the major ROW maintenance concern. Observation of the revegetation efforts clearly shows the need for adequate and appropriate reclamation by qualified equipment operators up front, and a patient, measured effort of continued revegetation, weed control and erosion control over the long term. The bond period of 5 years may not be long enough to achieve the 90 percent revegetation success required by the permit. Future projects guidelines should consider look to a flexible timeframe and more realistic vegetation requirements to account for the effects of non-construction related impacts.

  6. Concurrent Wind Cooling in Power Transmission Lines

    SciTech Connect

    Jake P Gentle

    2012-08-01

    Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

  7. Common raven occurrence in relation to transmission line corridors transiting human-altered sagebrush steppe

    USGS Publications Warehouse

    Coates, Peter S.; Howe, Kristy B.; Casazza, Michael L.; Delehanty, David J.

    2014-01-01

    Energy-related infrastructure and other human enterprises within sagebrush steppe of the American West often results in changes that promote common raven (Corvus corax; hereafter, raven) populations. Ravens, a generalist predator capable of behavioral innovation, present a threat to many species of conservation concern. We evaluate the effects of detailed features of an altered landscape on the probability of raven occurrence using extensive raven survey (n= 1045) and mapping data from southern Idaho, USA. We found nonlinear relationships between raven occurrence and distances to transmission lines, roads, and facilities. Most importantly, raven occurrence was greater with presence of transmission lines up to 2.2 km from the corridor.We further explain variation in raven occurrence along anthropogenic features based on the amount of non-native vegetation and cover type edge, such that ravens select fragmented sagebrush stands with patchy, exotic vegetative introgression. Raven occurrence also increased with greater length of edge formed by the contact of big sagebrush (Artemisia tridentate spp.) with non-native vegetation cover types. In consideration of increasing alteration of sagebrush steppe, these findings will be useful for planning energy transmission corridor placement and other management activities where conservation of sagebrush obligate species is a priority.

  8. Birds on power lines

    NASA Astrophysics Data System (ADS)

    Arnaldo Redinz, José

    2014-07-01

    Why can a bird safely rest on a high-voltage power line? We discuss three effects that can lead to the development of voltages and currents in the bird's body. To explain the absence of electric shocks, we give numerical estimates of these voltages and currents obtained from the standard solution for the voltage along a two-wire transmission line.

  9. Power line detection system

    DOEpatents

    Latorre, Victor R.; Watwood, Donald B.

    1994-01-01

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard.

  10. Power line detection system

    DOEpatents

    Latorre, V.R.; Watwood, D.B.

    1994-09-27

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard. 4 figs.

  11. Conservation with underground power lines

    SciTech Connect

    Graneau, P.

    1980-01-01

    The following aspects of underground power transmission lines are discussed: their contribution to area beautification; line losses and their causes; the energy conservation potential of large-conductor underground cables; reliability and outage advantages as compared with overhead lines; the history of underground systems; problems with polyethylene insulation; and the development and performance of sodium conductors for underground cables. (LCL)

  12. Prediction of corridor effect from the launching of the satellite power system. [air pollutant concentration into narrow band of latitude

    NASA Technical Reports Server (NTRS)

    Borucki, W. J.; Whitten, R. C.; Woodward, H. T.; Capone, L. A.; Riegel, C. A.

    1982-01-01

    A diagnostic model is developed to define the parameters which control the corridor effect of contaminants deposited in a narrow latitudinal band of the earth's atmosphere by numerous launches of the STS and heavy lift launch vehicles for construction of satellite solar power systems. Identified factors included the pollution injection rate, the ambient background levels of the pollutant species, and the transport properties related to the dilution rate of the chemicals. If the chemical life of the pollutant was shorter or the same length of time as the transport time, alterations in the chemical production and loss rates were found to be parameters necessarily added to the model. A comparison with NASA Ames Research Center two-dimensional model results indicate that the corridor effect was possile with operations above 60 km in the case of H2O, H2, and NO production.

  13. Collaboration across the Power Line.

    ERIC Educational Resources Information Center

    Romer, Karen T.; Whipple, William R.

    1991-01-01

    The college student who participates in genuine collaboration with a faculty member in an intellectual endeavor transcends the barrier of power. Once it has been breached, other power lines will be less constraining. The experience transforms the nature of learning and constructs a lasting authority in the student. (MSE)

  14. 24. View looking north up corridor from Charles Street Bridge. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. View looking north up corridor from Charles Street Bridge. Providence, Providence Co., RI. Sec. 4116, mp 186.44. - Northeast Railroad Corridor, Amtrak route between CT & MA state lines, Providence, Providence County, RI

  15. 1. HEBRONVILLE MILL COMPLEX ADJACENT TO NORTHEAST CORRIDOR. HEBRONVILLE, BRISTOL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. HEBRONVILLE MILL COMPLEX ADJACENT TO NORTHEAST CORRIDOR. HEBRONVILLE, BRISTOL CO., MA. Sec. 4116, MP 193.75. - Northeast Railroad Corridor, Amtrak Route between RI/MA State Line & South Station, Boston, Suffolk County, MA

  16. 23. Looking N up corridor from Chick Interlocking Tower. Boston, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Looking N up corridor from Chick Interlocking Tower. Boston, Suffolk Co., MA. Sec. 4116, MP 227.09. - Northeast Railroad Corridor, Amtrak Route between RI/MA State Line & South Station, Boston, Suffolk County, MA

  17. 3. DODGEVILLE MILL COMPLEX ADJACENT TO NORTHEAST CORRIDOR DODGEVILLE, BRISTOL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. DODGEVILLE MILL COMPLEX ADJACENT TO NORTHEAST CORRIDOR DODGEVILLE, BRISTOL CO., MA. Sec. 4116, MP 195.55. - Northeast Railroad Corridor, Amtrak Route between RI/MA State Line & South Station, Boston, Suffolk County, MA

  18. Ames Lab 101: Next Generation Power Lines

    ScienceCinema

    Russell, Alan

    2012-08-29

    Ames Laboratory scientist Alan Russell discusses the need to develop new power lines that are stronger and more conductive as a way to address the problem of the nation's aging and inadequate power grid.

  19. Power Line Technician's Training. Instructional Units.

    ERIC Educational Resources Information Center

    Smith, Earle L.

    These instructional units, developed in Oklahoma, are designed for training power line technicians for rural electric cooperatives. Planned to help current employees advance in knowledge and skill, the instructional materials are divided into seven areas of training: Laborer; Groundworker or Equipment Operator; Power Line Technician, Step 1; Power…

  20. Western Energy Corridor -- Energy Resource Report

    SciTech Connect

    Leslie Roberts; Michael Hagood

    2011-06-01

    The world is facing significant growth in energy demand over the next several decades. Strategic in meeting this demand are the world-class energy resources concentrated along the Rocky Mountains and northern plains in Canada and the U.S., informally referred to as the Western Energy Corridor (WEC). The fossil energy resources in this region are rivaled only in a very few places in the world, and the proven uranium reserves are among the world's largest. Also concentrated in this region are renewable resources contributing to wind power, hydro power, bioenergy, geothermal energy, and solar energy. Substantial existing and planned energy infrastructure, including refineries, pipelines, electrical transmission lines, and rail lines provide access to these resources.

  1. Automatic 3D power line reconstruction of multi-angular imaging power line inspection system

    NASA Astrophysics Data System (ADS)

    Zhang, Wuming; Yan, Guangjian; Wang, Ning; Li, Qiaozhi; Zhao, Wei

    2007-06-01

    We develop a multi-angular imaging power line inspection system. Its main objective is to monitor the relative distance between high voltage power line and around objects, and alert if the warning threshold is exceeded. Our multi-angular imaging power line inspection system generates DSM of the power line passage, which comprises ground surface and ground objects, for example trees and houses, etc. For the purpose of revealing the dangerous regions, where ground objects are too close to the power line, 3D power line information should be extracted at the same time. In order to improve the automation level of extraction, reduce labour costs and human errors, an automatic 3D power line reconstruction method is proposed and implemented. It can be achieved by using epipolar constraint and prior knowledge of pole tower's height. After that, the proper 3D power line information can be obtained by space intersection using found homologous projections. The flight experiment result shows that the proposed method can successfully reconstruct 3D power line, and the measurement accuracy of the relative distance satisfies the user requirement of 0.5m.

  2. Circuit for Communication Over Power Lines

    NASA Technical Reports Server (NTRS)

    Krasowski, Michael J.; Prokop, Normal F.; Greer, Lawrence C., III; Nappier, Jennifer

    2011-01-01

    Many distributed systems share common sensors and instruments along with a common power line supplying current to the system. A communication technique and circuit has been developed that allows for the simple inclusion of an instrument, sensor, or actuator node within any system containing a common power bus. Wherever power is available, a node can be added, which can then draw power for itself, its associated sensors, and actuators from the power bus all while communicating with other nodes on the power bus. The technique modulates a DC power bus through capacitive coupling using on-off keying (OOK), and receives and demodulates the signal from the DC power bus through the same capacitive coupling. The circuit acts as serial modem for the physical power line communication. The circuit and technique can be made of commercially available components or included in an application specific integrated circuit (ASIC) design, which allows for the circuit to be included in current designs with additional circuitry or embedded into new designs. This device and technique moves computational, sensing, and actuation abilities closer to the source, and allows for the networking of multiple similar nodes to each other and to a central processor. This technique also allows for reconfigurable systems by adding or removing nodes at any time. It can do so using nothing more than the in situ power wiring of the system.

  3. 47 CFR 15.113 - Power line carrier systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Power line carrier systems. 15.113 Section 15... Radiators § 15.113 Power line carrier systems. Power line carrier systems, as defined in § 15.3(t), are subject only to the following requirements: (a) A power utility operating a power line carrier...

  4. 47 CFR 15.113 - Power line carrier systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Power line carrier systems. 15.113 Section 15... Radiators § 15.113 Power line carrier systems. Power line carrier systems, as defined in § 15.3(t), are subject only to the following requirements: (a) A power utility operating a power line carrier...

  5. 76 FR 14986 - Notice of Availability of the Record of Decision for the One Nevada Transmission Line (ON Line...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... Action, in which the power line would be located largely within West-Wide Energy Corridors; (2) an... used in the analysis of impacts. The ON Line Final EIS addresses impacts of the power line on private... Line (ON Line) Project, Nevada AGENCY: Bureau of Land Management, Interior. ACTION: Notice...

  6. Flight route Designing and mission planning Of power line inspecting system Based On multi-sensor UAV

    NASA Astrophysics Data System (ADS)

    Xiaowei, Xie; Zhengjun, Liu; Zhiquan, Zuo

    2014-03-01

    In order to obtain various information of power facilities such as spatial location, geometry, images data and video information in the infrared and ultraviolet band and so on, Unmanned Aerial Vehicle (UAV) power line inspecting system needs to integrate a variety of sensors for data collection. Low altitude and side-looking imaging are required for UAV flight to ensure sensors to acquire high-quality data and device security. In this paper, UAV power line inspecting system is deferent from existing ones that used in Surveying and Mapping. According to characteristics of UAV for example equipped multiple sensor, side-looking imaging, working at low altitude, complex terrain conditions and corridor type flight, this paper puts forward a UAV power line inspecting scheme which comprehensively considered of the UAV performance, sensor parameters and task requirements. The scheme is finally tested in a region of Guangdong province, and the preliminary results show that the scheme is feasible.

  7. Power divergences in overlapping Wilson lines

    NASA Astrophysics Data System (ADS)

    Berwein, Matthias

    2016-01-01

    We discuss the divergence structure of Wilson line operators with partially overlapping segments on the basis of the cyclic Wilson loop as an explicit example. The generalized exponentiation theorem is used to show the exponentiation and factorization of power divergences for certain linear combinations of associated loop functions.

  8. Interaction of lightning with power distribution lines

    NASA Astrophysics Data System (ADS)

    Mata, Carlos Tomas

    Triggered-lightning experiments were conducted in 1996, 1999, and 2000 to study the responses of overhead power distribution lines to lightning at the International Center for Lightning Research and Testing (ICLRT) at Camp Blanding, Florida. The lightning was artificially initiated (triggered) from natural thunderclouds using the rocket-and-wire technique, and its current was directed to a phase conductor at midspan or at a pole near the center of the line. Experimental results and associated EMTP modeling are presented in this dissertation for the following line configurations: (1)a two-conductor, 740-m overhead distribution line with 2 arrester stations in 1996; (2)a four- conductor, 245-m overhead distribution line with 2 arrester stations in 1999; and (3)a four-conductor, 829-m overhead distribution line with 6 arrester stations in 2000. The three-phase lines tested in 1999 and 2000 were standard designs of a major Florida power company. Lightning peak currents injected into the lines ranged from 7 to 57 kA. Voltages and currents were measured at various locations along the line. Video and photographic cameras were used to image lightning channels and detect line flashovers. The significant results of the research are (1)flashovers between conductors were observed, both accompanied and not accompanied by arrester failures, (2)an arrester failed on seven of eight direct lightning strikes to the line in 2000, (3)arcing between conductors may prevent failures of arresters connected to the struck phase, (4)the bulk of the lightning current flows from the struck phase to neutral through the arresters closest to the strike point, (5)the withstand energy of the arresters can be exceeded due to the contribution from multiple strokes and/or relatively low-level, long-lasting current components, (6)the distribution of charge transferred to ground among multiple neutral grounds, which is determined by low-frequency, low-current grounding resistances is different from the

  9. Power line monitoring system using fiber optic power supply

    NASA Astrophysics Data System (ADS)

    Tanaka, Yosuke; Shioda, Tatsutoshi; Kurokawa, Takashi; Oka, Junji; Ueta, Kazuyuki; Fukuoka, Toshiharu

    2009-05-01

    We propose a novel power-line-monitoring system using optical fibers for transmitting power as well as signal. The principle is experimentally confirmed with a system composed of a monitoring side with a 1.5-μm laser diode, transmission line of a single mode fiber, and a sensing side having an efficient photovoltaic (PV) cell, electrical junction sensor, and low power liquid crystal optical modulator (LCOM). The PV cell generates the electrical power in the sensing side with a conversion efficiency of 20%. The LCOM is driven with low power of less than 50 μW, modulates the laser light with a signal indicating the power line condition, and transmits the optical signal. The developed sensing unit produces an optical signal having an extinction ratio of 15 dB with low optical power of 1.8 mW. Five systems were in operation for two years, faithfully monitoring the oil pressure in electrical cables every 20 min without incident.

  10. Random Forests Based Multiple Classifier System for Power-Line Scene Classification

    NASA Astrophysics Data System (ADS)

    Kim, H. B.; Sohn, G.

    2011-09-01

    The increasing use of electrical energy has yielded more necessities of electric utilities including transmission lines and electric pylons which require a real-time risk monitoring to prevent massive economical damages. Recently, Airborne Laser Scanning (ALS) has become one of primary data acquisition tool for corridor mapping due to its ability of direct 3D measurements. In particular, for power-line risk management, a rapid and accurate classification of power-line objects is an extremely important task. We propose a 3D classification method combining results obtained from multiple classifier trained with different features. As a base classifier, we employ Random Forests (RF) which is a composite descriptors consisting of a number of decision trees populated through learning with bootstrapping samples. Two different sets of features are investigated that are extracted in a point domain and a feature (i.e., line & polygon) domain. RANSAC and Minimum Description Length (MDL) are applied to create lines and a polygon in each volumetric pixel (voxel) for the line & polygon features. Two RFs are trained from the two groups of features uncorrelated by Principle Component Analysis (PCA), which results are combined for final classification. The experiment with two real datasets demonstrates that the proposed classification method shows 10% improvements in classification accuracy compared to a single classifier.

  11. 29 CFR 1926.1411 - Power line safety-while traveling under or near power lines with no load.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Power line safety-while traveling under or near power lines... CONSTRUCTION Cranes and Derricks in Construction § 1926.1411 Power line safety—while traveling under or near... equipment traveling under or near a power line on a construction site with no load. Equipment traveling on...

  12. 29 CFR 1926.1411 - Power line safety-while traveling under or near power lines with no load.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Power line safety-while traveling under or near power lines... CONSTRUCTION Cranes and Derricks in Construction § 1926.1411 Power line safety—while traveling under or near... equipment traveling under or near a power line on a construction site with no load. Equipment traveling on...

  13. 13. I95 bridge crossing corridor with Providence Station in background. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. I-95 bridge crossing corridor with Providence Station in background. Providence, Providence County, RI. sec. 4116, mp 185.15. - Northeast Railroad Corridor, Amtrak route between CT & MA state lines, Providence, Providence County, RI

  14. 29 CFR 1926.1411 - Power line safety-while traveling under or near power lines with no load.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... qualified person with respect to electrical power transmission and distribution). ... 29 Labor 8 2014-07-01 2014-07-01 false Power line safety-while traveling under or near power lines... CONSTRUCTION Cranes and Derricks in Construction § 1926.1411 Power line safety—while traveling under or...

  15. 29 CFR 1926.1411 - Power line safety-while traveling under or near power lines with no load.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... qualified person with respect to electrical power transmission and distribution). ... 29 Labor 8 2013-07-01 2013-07-01 false Power line safety-while traveling under or near power lines... CONSTRUCTION Cranes and Derricks in Construction § 1926.1411 Power line safety—while traveling under or...

  16. U. H. F. Power Transistors and Lecher Line Oscillators.

    ERIC Educational Resources Information Center

    Howes, R. W.

    1980-01-01

    Describes the use of transistors instead of valves for Lecher line and radiation demonstrations. Two oscillator circuits which provide power for Lecher line use are described. Impedance of Lecher line is also discussed. (HM)

  17. Apparatus and Method for Communication over Power Lines

    NASA Technical Reports Server (NTRS)

    Krasowski, Michael J. (Inventor); Prokop, Norman F. (Inventor); Greer, Lawrence C., III (Inventor); Nappier, Jennifer M. (Inventor)

    2015-01-01

    An apparatus and method are provided for communicating over power lines. The apparatus includes a coupling modem that is situated between a power line and a device. The coupling modem is configured to demodulate a signal received from the power line into a sine signal and a cosine signal. The coupling modem is also configured to modulate a communicated bit stream received from the device into a transmitted signal in order to impose the transmitted signal onto the power line.

  18. Current transducers used in power line measurements

    NASA Astrophysics Data System (ADS)

    Milcarz, Sz.; Gołebiowski, J.

    2014-08-01

    There are many solutions used for current measurements in power lines. The study shows a transducer consisting of a ferromagnetic core, a beam placed in an air-gap and a sensor for optical readout. The beam is made of silicon with a thin 50%Ni50%Fe film. The material of the core is permalloy. A distribution of magnetic field depends on current supplying the power line. The beam is deflected due to magnetic field in the air-gap. A deflection of the beam is measured by the optical fibre sensor. Its advantage is simple design, high precision of processing, non-electric transmission, low costs and ability of a non-contact measurement. Comsol Multiphysics 4.4 and Magnetic Fields Module (mef) were used for modeling. An influence of magnetic circuit's materials and dimensions of the ferromagnetic core and the air-gap were tested in order to determine the most sufficient distribution of magnetic field in the air-gap. The study shows results of the modeling of the transducer compared to practical results for a similar construction scaled down to lower current values.

  19. Power lines harmonic radiation in circumterrestrial space

    NASA Astrophysics Data System (ADS)

    Pronenko, Vira; Korepanov, Valery; Dudkin, Denis

    2014-05-01

    Currently, one of the main areas in the near-Earth space research is the space weather exploration and forecasting. This study mainly relates to solar activity influence on the ionosphere and the Earth's atmosphere (i.e., the energy transfer in the direction of the Sun-magnetosphere-ionosphere-atmosphere-surface of the Earth) and does not reflect a significant impact of the powerful natural and anthropogenic processes, which occur on the Earth's surface and influence on the atmosphere-ionosphere-magnetosphere chain. The powerful sources and consumers of electrical energy (radio transmitters, power plants, power lines and industrial objects) cause different ionospheric phenomena, for example, changes of the electromagnetic (EM) field and plasma in the ionosphere, and affect on the state of the Earth atmosphere. Anthropogenic EM effects in the ionosphere are already observed by the scientific satellites. Consequences of anthropogenic impacts on the ionosphere are not currently known. Therefore, it is very important and urgent task to conduct the statistically significant research of the ionospheric parameters variations due to the influence of the powerful man-made factors, primarily owing to substantial increase of the EM energy production. Naturally, the satellite monitoring of the ionosphere and magnetosphere in the frequency range from tens of hertz to tens of MHz with wide ground support offers the best opportunity to observe the EM energy release, both in the global and local scales. The available experimental data, as well as theoretical estimations, allow with a high degree of certainty to say that the permanent satellite monitoring of the ionospheric and magnetospheric anthropogenic EM perturbations can be used for: a) objective assessment and prediction of the space weather conditions; b) evaluation of the daily or seasonal changes in the level of energy consumption; c) construction of a map for estimation of near space EM pollution. The examples of power

  20. 47 CFR 15.113 - Power line carrier systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Power line carrier systems. 15.113 Section 15.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unintentional Radiators § 15.113 Power line carrier systems. Power line carrier systems, as defined in § 15.3(t),...

  1. 47 CFR 15.113 - Power line carrier systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Power line carrier systems. 15.113 Section 15.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unintentional Radiators § 15.113 Power line carrier systems. Power line carrier systems, as defined in § 15.3(t),...

  2. 47 CFR 15.113 - Power line carrier systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Power line carrier systems. 15.113 Section 15.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unintentional Radiators § 15.113 Power line carrier systems. Power line carrier systems, as defined in § 15.3(t),...

  3. 32 CFR 644.431 - Power transmission lines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Power transmission lines. 644.431 Section 644... Power transmission lines. (a) Authority. Pursuant to the provisions of section 13(d) of the Surplus... power transmission line and the right of way acquired for its construction is needed for or adaptable...

  4. 32 CFR 644.431 - Power transmission lines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Power transmission lines. 644.431 Section 644... Power transmission lines. (a) Authority. Pursuant to the provisions of section 13(d) of the Surplus... power transmission line and the right of way acquired for its construction is needed for or adaptable...

  5. X-Band Strip-Line Power Divider/Combiner

    NASA Technical Reports Server (NTRS)

    Conroy, B. L.

    1985-01-01

    Strip-line circuit for X-band signals both divides and combines microwave power for distributed amplifier. Strip-line pattern (foil pattern over insulating layer over ground plane) laid out so all eight distributed ports lie at electrical distances of odd integral multiples of half wavelength from main input/output port. Strip line used as power divider and as power combiner.

  6. Unequal-Split Strip-Line Power Divider

    NASA Technical Reports Server (NTRS)

    Bailey, M. C.

    1982-01-01

    Simple technique for designing strip-line or microstrip power dividers can be used for unequal, but inphase power split. Technique allows power splits ranging from equal to as large as required, with advantage of using same line impedances and line spacings for all splits. Output power ratio is determined by selecting location of input port in manner analogous to tap point for electric-power transformer.

  7. Automatic Railway Power Line Extraction Using Mobile Laser Scanning Data

    NASA Astrophysics Data System (ADS)

    Zhang, Shanxin; Wang, Cheng; Yang, Zhuang; Chen, Yiping; Li, Jonathan

    2016-06-01

    Research on power line extraction technology using mobile laser point clouds has important practical significance on railway power lines patrol work. In this paper, we presents a new method for automatic extracting railway power line from MLS (Mobile Laser Scanning) data. Firstly, according to the spatial structure characteristics of power-line and trajectory, the significant data is segmented piecewise. Then, use the self-adaptive space region growing method to extract power lines parallel with rails. Finally use PCA (Principal Components Analysis) combine with information entropy theory method to judge a section of the power line whether is junction or not and which type of junction it belongs to. The least squares fitting algorithm is introduced to model the power line. An evaluation of the proposed method over a complicated railway point clouds acquired by a RIEGL VMX450 MLS system shows that the proposed method is promising.

  8. 1. TEMPORARY POWER HOUSE AT ROOSEVELT DAM. TRAMWAY LINES CAN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. TEMPORARY POWER HOUSE AT ROOSEVELT DAM. TRAMWAY LINES CAN BE SEEN AT TOP OF PHOTOGRAPH Photographer: Walter J. Lubken, May 10, 1906 - Roosevelt Power Canal & Diversion Dam, Parallels Salt River, Roosevelt, Gila County, AZ

  9. 53. LAYOUT OF POWER CANAL LINE, LIST OF STRUCTURES Courtesy ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. LAYOUT OF POWER CANAL LINE, LIST OF STRUCTURES Courtesy of Reclamation Service, Salt River Project, Arizona - Roosevelt Power Canal & Diversion Dam, Parallels Salt River, Roosevelt, Gila County, AZ

  10. 2. LOOKING DOWN THE LINED POWER CANAL AS IT WINDS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. LOOKING DOWN THE LINED POWER CANAL AS IT WINDS ITS WAY TOWARD THE CEMENT MILL Photographer: Walter J. Lubken, November 19, 1907 - Roosevelt Power Canal & Diversion Dam, Parallels Salt River, Roosevelt, Gila County, AZ

  11. Coupling an induction motor type generator to ac power lines. [making windmill generators compatible with public power lines

    NASA Technical Reports Server (NTRS)

    Nola, F. J. (Inventor)

    1984-01-01

    A system for coupling an induction motor type generator to an A.C. power line includes an electronic switch means that is controlled by a control system and is regulated to turn on at a relatively late point in each half cycle of its operation. The energizing power supplied by the line to the induction motor type generator is decreased and the net power delivered to the line is increased.

  12. 32 CFR 644.431 - Power transmission lines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Power transmission lines. 644.431 Section 644.431... transmission lines. (a) Authority. Pursuant to the provisions of section 13(d) of the Surplus Property Act of... transmission line and the right of way acquired for its construction is needed for or adaptable to...

  13. 32 CFR 644.431 - Power transmission lines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Power transmission lines. 644.431 Section 644.431... transmission lines. (a) Authority. Pursuant to the provisions of section 13(d) of the Surplus Property Act of... transmission line and the right of way acquired for its construction is needed for or adaptable to...

  14. 32 CFR 644.431 - Power transmission lines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Power transmission lines. 644.431 Section 644.431... transmission lines. (a) Authority. Pursuant to the provisions of section 13(d) of the Surplus Property Act of... transmission line and the right of way acquired for its construction is needed for or adaptable to...

  15. The system of power on line

    NASA Astrophysics Data System (ADS)

    Wang, Yang; Zhou, Zhen; Yang, Xu; Chen, Qiu Fu

    2004-04-01

    As the digital network is expanding so quickly, many applications are widely used in the social living, especially wireless LAN and IP telephone. The DTE(Data Terminal Equipment) based on Ethernet are also used in many place, these equipments have low power cost, but commonly they have very high requirements in stability and reliability of power supply. This article brings forward a system solution project of long-distance centralize power supply, which can be controlled by network, according to the 802.3af standard. And also presents the key technology in this solution.

  16. Power Line Integrity Monitor and Repeater

    Energy Science and Technology Software Center (ESTSC)

    2005-09-30

    The Idaho National Laboratory (INL) has developed a power system integrity monitor and repeater that provide real time status of the integrity of the physical structure of power poles and transmission towers. It may be applied to other structures, such as pipelines or cell towers, which have multiple segments that can cover hundreds of miles. Sensors and on-board processing provide indication of tampering or impending damage to the structure with information provided to the centralmore » operations center or supervisory control and data acquisition (SCADA) for mitigative actions. This software runs on a series of small, inexpensive, low power electronic sensor platforms that are mounted on each tower of an electric power transmission or distribution system for the purpose of communicating system integrity to a central location. The software allows each platform to: 1) interface with sensors that monitor tower integrity, 2) record and analyze events, 3) communicate sensor information to other sensor platforms located on adjacent towers or to a central monitoring location, and 4) derive, conserve, and store platform power from the transmission of electric power.« less

  17. Power Line Integrity Monitor and Repeater

    SciTech Connect

    Svoboda, John

    2005-09-30

    The Idaho National Laboratory (INL) has developed a power system integrity monitor and repeater that provide real time status of the integrity of the physical structure of power poles and transmission towers. It may be applied to other structures, such as pipelines or cell towers, which have multiple segments that can cover hundreds of miles. Sensors and on-board processing provide indication of tampering or impending damage to the structure with information provided to the central operations center or supervisory control and data acquisition (SCADA) for mitigative actions. This software runs on a series of small, inexpensive, low power electronic sensor platforms that are mounted on each tower of an electric power transmission or distribution system for the purpose of communicating system integrity to a central location. The software allows each platform to: 1) interface with sensors that monitor tower integrity, 2) record and analyze events, 3) communicate sensor information to other sensor platforms located on adjacent towers or to a central monitoring location, and 4) derive, conserve, and store platform power from the transmission of electric power.

  18. Extraction of power lines from mobile laser scanning data

    NASA Astrophysics Data System (ADS)

    Xiang, Qing; Li, Jonathan; Wen, Chenglu; Huang, Pengdi

    2016-03-01

    Modern urban life is becoming increasingly more dependent on reliable electric power supply. Since power outages cause substantial financial losses to producers, distributors and consumers of electric power, it is in the common interest to minimize failures of power lines. In order to detect defects as early as possible and to plan efficiently the maintenance activities, distribution networks are regularly inspected. Carrying out foot patrols or climbing the structures to visually inspect transmission lines and aerial surveys (e.g., digital imaging or most recent airborne laser scanning (ALS) are the two most commonly used methods of power line inspection. Although much faster in comparison to the foot patrol inspection, aerial inspection is more expensive and usually less accurate, in complex urban areas particularly. This paper presents a scientific work that is done in the use of mobile laser scanning (MLS) point clouds for automated extraction of power lines. In the proposed method, 2D power lines are extracted using Hough transform in the projected XOY plane and the 3D power line points are visualized after the point searching. Filtering based on an elevation threshold is applied, which is combined with the vehicle's trajectory in the horizontal section.

  19. Wireless power transfer and fault diagnosis of high-voltage power line via robotic bird

    NASA Astrophysics Data System (ADS)

    Liu, Chunhua; Chau, K. T.; Zhang, Zhen; Qiu, Chun; Li, Wenlong; Ching, T. W.

    2015-05-01

    This paper presents a new idea of wireless power transfer (WPT) and fault diagnosis (FD) of high-voltage power line via robotic bird. The key is to present the conceptual robotic bird with WPT coupling coil for detecting and capturing the energy from the high-voltage power line. If the power line works in normal condition, the robotic bird is able to stand on the power line and extract energy from it. If fault occurs on the power line, the corresponding magnetic field distribution will become different from that in the normal situation. By analyzing the magnetic field distribution of the power line, the WPT to the robotic bird and the FD by the robotic bird are performed and verified.

  20. Integrating Residential Photovoltaics With Power Lines

    NASA Technical Reports Server (NTRS)

    Borden, C. S.

    1985-01-01

    Report finds rooftop solar-cell arrays feed excess power to electric-utility grid for fee are potentially attractive large-scale application of photovoltaic technology. Presents assessment of breakeven costs of these arrays under variety of technological and economic assumptions.

  1. National Maglev initiative: California line electric utility power system requirements

    NASA Technical Reports Server (NTRS)

    Save, Phil

    1994-01-01

    The electrical utility power system requirements were determined for a Maglev line from San Diego to San Francisco and Sacramento with a maximum capacity of 12,000 passengers an hour in each direction at a speed of 300 miles per hour, or one train every 30 seconds in each direction. Basically the Maglev line requires one 50-MVA substation every 12.5 miles. The need for new power lines to serve these substations and their voltage levels are based not only on equipment loading criteria but also on limitations due to voltage flicker and harmonics created by the Maglev system. The resulting power system requirements and their costs depend mostly on the geographical area, urban or suburban with 'strong' power systems, or mountains and rural areas with 'weak' power systems. A reliability evaluation indicated that emergency power sources, such as a 10-MW battery at each substation, were not justified if sufficient redundancy is provided in the design of the substations and the power lines serving them. With a cost of $5.6 M per mile, the power system requirements, including the 12-kV DC cables and the inverters along the Maglev line, were found to be the second largest cost component of the Maglev system, after the cost of the guideway system ($9.1 M per mile), out of a total cost of $23 M per mile.

  2. A Simulator of Periodically Switching Channels for Power Line Communications

    NASA Astrophysics Data System (ADS)

    Hayasaki, Taro; Umehara, Daisuke; Denno, Satoshi; Morikura, Masahiro

    An indoor power line is one of the most attractive media for in-home networks. However, there are many technical problems for achieving in-home power line communication (PLC) with high rate and high reliability. One of such problem is the degradation in the performance of the in-home PLC caused by periodically time-varying channel responses, particularly when connecting the switching power supply equipment. We present a measurement method for power line channel responses and reveal the switching of the channel responses synchronized with power-frequency voltage when connecting switching power supply equipment in sending or receiving outlets. In this paper, we term them periodically switching channel responses. The performance of PLC adapters is seriously affected by the periodically switching channel responses. Therefore, we provide a modeling of the periodically switching channel responses by using finite impulse response (FIR) filters with a shared channel memory and construct a simulator for in-home power line channels including the periodically switching channel responses in order to evaluate the various communication systems through the power line. We present the validity of the proposed simulator through the performance evaluation of OFDM/64QAM over periodically switching channels with additive white Gaussian noise. Furthermore, we evaluate the influence of the periodically switching channel responses on the communication quality of a time-invariant modulation scheme by using the proposed simulator.

  3. 29. CROSSCUT FACILITY PROPERTY AND POWER LINE LOCATION, SHOWING INDIAN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. CROSSCUT FACILITY PROPERTY AND POWER LINE LOCATION, SHOWING INDIAN BEND POND LABELLED 'SETTLING BASIN,' STEAM/DIESEL PLANT AND OTHER FEATURES. 1951 - Crosscut Steam Plant, North side Salt River near Mill Avenue & Washington Street, Tempe, Maricopa County, AZ

  4. Living and Working Safely Around High-Voltage Power Lines.

    SciTech Connect

    United States. Bonneville Power Administration.

    2001-06-01

    High-voltage transmission lines can be just as safe as the electrical wiring in the homes--or just as dangerous. The crucial factor is ourselves: they must learn to behave safely around them. This booklet is a basic safety guide for those who live and work around power lines. It deals primarily with nuisance shocks due to induced voltages, and with potential electric shock hazards from contact with high-voltage lines. References on possible long-term biological effects of transmission lines are shown. In preparing this booklet, the Bonneville Power Administration has drawn on more than 50 years of experience with high-voltage transmission. BPA operates one of the world`s largest networks of long-distance, high-voltage lines. This system has more than 400 substations and about 15,000 miles of transmission lines, almost 4,400 miles of which are operated at 500,000 volts.

  5. Long Island Smart Energy Corridor

    SciTech Connect

    Mui, Ming

    2015-02-04

    The Long Island Power Authority (LIPA) has teamed with Stony Brook University (Stony Brook or SBU) and Farmingdale State College (Farmingdale or FSC), two branches of the State University of New York (SUNY), to create a “Smart Energy Corridor.” The project, located along the Route 110 business corridor on Long Island, New York, demonstrated the integration of a suite of Smart Grid technologies from substations to end-use loads. The Smart Energy Corridor Project included the following key features: -TECHNOLOGY: Demonstrated a full range of smart energy technologies, including substations and distribution feeder automation, fiber and radio communications backbone, advanced metering infrastructure (AM”), meter data management (MDM) system (which LIPA implemented outside of this project), field tools automation, customer-level energy management including automated energy management systems, and integration with distributed generation and plug-in hybrid electric vehicles. -MARKETING: A rigorous market test that identified customer response to an alternative time-of-use pricing plan and varying levels of information and analytical support. -CYBER SECURITY: Tested cyber security vulnerabilities in Smart Grid hardware, network, and application layers. Developed recommendations for policies, procedures, and technical controls to prevent or foil cyber-attacks and to harden the Smart Grid infrastructure. -RELIABILITY: Leveraged new Smart Grid-enabled data to increase system efficiency and reliability. Developed enhanced load forecasting, phase balancing, and voltage control techniques designed to work hand-in-hand with the Smart Grid technologies. -OUTREACH: Implemented public outreach and educational initiatives that were linked directly to the demonstration of Smart Grid technologies, tools, techniques, and system configurations. This included creation of full-scale operating models demonstrating application of Smart Grid technologies in business and residential

  6. Corridor use by diverse taxa.

    SciTech Connect

    Haddad, Nick, M.; Browne, David, R.; Cunningham, Alan; Danielson, Brent, J.; Levey, Douglas, J.; Sargent, Sarah; Spira, Tim

    2003-01-01

    Haddad, N.M., D.R. Browne, A. Cunningham, B.J. Danielson, D.J. Levey, S. Sargent, and T. Spira. 2003. Corridor use by diverse taxa. Ecology, 84(3):609-615. One of the most popular approaches for maintaining populations and conserving biodiversity in fragmented landscapes is to retain or create corridors that connect otherwise isolated habitat patches. Working in large-scale, experimental landscapes in which open-habitat patches and corridors were created by harvesting pine forest, we showed that corridors direct movements of different types of species, including butterflies, small mammals, and bird dispersed plants, causing higher movement between connected than between unconnected patches. Corridors directed the movement of all 10 species studied, with all corridor effect sizes >68%. However, this corridor effect was significant for five species, not significant for one species, and inconclusive for four species because of small sample sizes. Although we found no evidence that corridors increase emigration from a patch, our results show that movements of disparate taxa with broadly different life histories and functional roles are directed by corridors.

  7. Five Mass Power Transmission Line of a Ship Computer Modelling

    NASA Astrophysics Data System (ADS)

    Kazakoff, Alexander Borisoff; Marinov, Boycho Ivanov

    2016-03-01

    The work, presented in this paper, appears to be a natural continuation of the work presented and reported before, on the design of power transmission line of a ship, but with different multi-mass model. Some data from the previous investigations are used as a reference data, mainly from the analytical investigations, for the developed in the previ- ous study, frequency and modal analysis of a five mass model of a power transmission line of a ship. In the paper, a profound dynamic analysis of a concrete five mass dynamic model of the power transmission line of a ship is performed using Finite Element Analysis (FEA), based on the previously recommended model, investigated in the previous research and reported before. Thus, the partially validated by frequency analysis five mass model of a power transmission line of a ship is subjected to dynamic analysis. The objective of the work presented in this paper is dynamic modelling of a five mass transmission line of a ship, partial validation of the model and von Mises stress analysis calculation with the help of Finite Element Analysis (FEA) and comparison of the derived results with the analytically calculated values. The partially validated five mass power transmission line of a ship can be used for definition of many dy- namic parameters, particularly amplitude of displacement, velocity and acceleration, respectively in time and frequency domain. The frequency behaviour of the model parameters is investigated in frequency domain and it corresponds to the predicted one.

  8. In-line process instrumentation for geothermal power plants

    SciTech Connect

    Shannon, D.W.; Robertus, R.J.; Sullivan, R.G.; Kindle, C.H.; Pierce, D.D.

    1985-05-01

    The economics of geothermal power depend on satisfactory plant reliability of continuous operation. Plant problems and extended downtime due to corrosion failures, scale buildup, or injection well plugging have affected many past geothermal projects. If in-line instrumentation can be developed to alert plant operators to correctable problems, then the cost and reliability of geothermal power will be improved. PNL has completed a problem of development of in-line corrosion and chemical instrumentation for binary cycle plants, and this technology has been used to set up a monitoring program at the Heber Binary Demonstration Power Plant. The current emphasis has shifted to development of particle meters for use on injection lines and CO/sub 2/ and pH probes for use in control of calcite scaling. Plans have been outlined to develop and demonstrate flash plant instrumentation for corrosion monitoring, scaling, steam purity, and injection line particle counting. 2 refs., 17 figs., 1 tab.

  9. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect

    Not Available

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  10. Designs for a high power superconducting delay line

    SciTech Connect

    Chen, Y.J.; Caporaso, G.

    1997-06-26

    Potential designs for a high power superconducting delay line of approximately 10 microsecs duration are described. The transmitted signal should have low dispersion and little attenuation to recapture the original signal. Such demands cannot be met using conventional metal conductors. This paper outlines a proposal for a new transmission line design using low temperature superconducting material which meets system specifications. The 25 omega line is designed to carry pulsed signals with an approximate rise time of 8 nsec and a maximum voltage magnitude of 25 kV. Predicted electrical design and performance of the line will be presented.

  11. 18. Readiness Crew Building interior, lower level corridor. This corridor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Readiness Crew Building interior, lower level corridor. This corridor is located in the southwest side of the building and runs from southeast to northwest; view looking northwest from the exit door at the southeast end. Lyon - Whiteman Air Force Base, Bomber Alert Facility S-6, 1300 Alert Road, Knob Noster, Johnson County, MO

  12. 20. Readiness Crew Building interior, upper level corridor. This corridor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Readiness Crew Building interior, upper level corridor. This corridor runs from northwest to southeast. Photograph taken at the northwest end looking southeast. Lyon - Whiteman Air Force Base, Bomber Alert Facility S-6, 1300 Alert Road, Knob Noster, Johnson County, MO

  13. Fracture corridors in carbonates

    NASA Astrophysics Data System (ADS)

    Chatelée, Sébastien; Lamarche, Juliette; Gauthier, Bertrand D. M.

    2015-04-01

    Among fractures, Fracture Corridors (FC) are anomalous structures made of highly persistent fracture clusters having a strong effect on multi-phase fluid flow in the subsurface. While mechanical and geological conditions for diffuse fracture systems are well constrained, FC genetic conditions remain a matter of questioning. FC can be localized in larger structures such as folds and fault zones but recent studies suggest that a large amount of fractures and FC also arise as distributed in the host rock and formed in tabular layers during burial with early rock mechanical differentiation. In addition, while the mechanical stratigraphy is of prime importance for fracture stratigraphy, it is still unknown which factor prevails on FC genesis among the local versus regional stress-state, the host rock mechanical stratigraphy or the sedimentary facies. We present a study of fractures in a 400×300 m wide quarry (Calvisson, SE France) dug in homogeneous marly limestones of Hauterivian age. The quarry exhibits diffuse fractures as well as 16 FC. The aim of this study is to reveal the genetics factor for FC development, their global geometry and internal morphologic variations, but also to clear the impact of fracture corridors on diffuse fracture. For that, we measured >2500 fractures (strike, dip, spacing, filling, aperture, etc.) and studied microstructures in 80 thin sections. We calculated fracture density and acquired LiDAR data with >90 million points with a resolution of 4 to 15mm. Diffuse fractures are organized as two perpendicular sets, a main set NE-SW-trending and minor set NW-SE-trending. The FC have the same trend, but the NW-SE trend prevail on the NE-SW one. The LiDAR acquisition allows to visualize the 3D lateral continuity with corridors with a minimal extension of 30m. We distinguish 4 internal morphologic types in FC, depending on fracture morphology, occurrence of breccia and number of zones. The types may occur in a single FC with a lateral transition

  14. Signal pulses superimposed on power supply lines improve electrical control

    SciTech Connect

    1996-06-01

    To manipulate or monitor the operation of cranes and hoists, control engineers typically create control schemes that add numerous conductors, festoon systems, bulky dedicated conductor rails, radio and infrared controls. With modern power line communication equipment, power and intelligence can be combined to: add an unlimited number of control circuits without adding a single wire; have data communication without special cables; and eliminate bulky festoon systems and heavy cable track. Available from US Safety Trolley Corp., a SmartRail system superimposes data and control information on the power line to create a fully functional Local Area Network (LAN). The system network is based on the CEBus protocol EIA/IS-60 and uses a spread spectrum power line carrier technology. The heart of this system is the controller which manages all communication and control tasks. A power line coupling circuit couples the data signal from the controller to the a-c power conductors. These power conductors are often TRI-BAR/FOUR-BAR continuous conductor bar systems or existing conductor bar systems. The combination results in a secure data communications and control system for moving equipment.

  15. Magnetic and electric field testing of the Amtrak Northeast Corridor and New Jersey transit/North Jersey coast line rail systems. Volume 2. Appendices. Final report, May 1993-March 1993

    SciTech Connect

    Dietrich, F.M.; Robertson, D.C.; Steiner, G.A.

    1993-04-01

    The safety of magnetically levitated (maglev) and high speed rail (HSR) trains proposed for application in the United States is the responsibility of the Federal Railroad Administration (FRA). The characterization of electric and magnetic fields (EMF) produced by both steady (dc) and alternating currents (ac) at power frequency (50 Hz in Europe and 60 Hz in the U.S.) and above, in the Extreme Low Frequency (ELF) range (3-3000 Hz), is of interest with respect to any potential health effects these fields may have on the public and on transportation workers. An EMF survey of National Rail Passengers Corporation trains operating on the Northeast Corridor (NEC) was performed, as part of a comprehensive comparative safety assessment of the German Transrapid (TR-07) maglev system and of existing (NEC and transit trains) and advanced rail systems (the French TGV). The report is Volume 2 of two volumes. A portable magnetic field monitoring system (augmented to include an electric fields probe) was used to sample, record and store three-axis static and ac magnetic fields waveforms simultaneously, at multiple locations. A real time Digital Audio Tape (DAT) recorder able to capture EMF transients, and two personal power-frequency magnetic field monitors were used to collect complementary data.

  16. Magnetic and electric field testing of the Amtrak Northeast Corridor and New Jersey Transit/North Jersey coast line rail systems. Volume 1. Analysis. Final report, May 1992-March 1992

    SciTech Connect

    Dietrich, F.M.; Feero, W.E.; Papas, P.N.; Steiner, G.A.

    1993-04-01

    The safety of magnetically levitated (maglev) and high speed rail (HSR) trains proposed for application in the United States is the responsibility of the Federal Railroad Administration (FRA). The characterization of electric and magnetic fields (EMF) produced by both steady (dc) and alternating currents (ac) at power frequency (50 Hz in Europe and 60 Hz in the U.S.) and above, in the Extreme Low Frequency (ELF) range (3-3000 Hz), is of interest with respect to any potential health effects these fields may have on the public and on transportation workers. An EMF survey of National Rail Passengers Corporation trains operating on the Northeast Corridor (NEC) was performed, as part of a comprehensive comparative safety assessment of the German Transrapid (TR-07) maglev system, and of existing (NEC and transit trains) and advanced rail systems (the French TGV). The report is Volume 1 of two volumes. A portable magnetic field monitoring system (augmented to include an electric fields probe) was used to sample, record and store three-axis static and ac magnetic fields waveforms simultaneously, at multiple locations. A real time Digital Audio Tape (DAT) recorder able to capture EMF transients, and two personal power-frequency magnetic field monitors were used to collect complementary data.

  17. Fast wave power flow along SOL field lines in NSTX

    NASA Astrophysics Data System (ADS)

    Perkins, R. J.; Bell, R. E.; Diallo, A.; Gerhardt, S.; Hosea, J. C.; Jaworski, M. A.; Leblanc, B. P.; Kramer, G. J.; Phillips, C. K.; Roquemore, L.; Taylor, G.; Wilson, J. R.; Ahn, J.-W.; Gray, T. K.; Green, D. L.; McLean, A.; Maingi, R.; Ryan, P. M.; Jaeger, E. F.; Sabbagh, S.

    2012-10-01

    On NSTX, a major loss of high-harmonic fast wave (HHFW) power can occur along open field lines passing in front of the antenna over the width of the scrape-off layer (SOL). Up to 60% of the RF power can be lost and at least partially deposited in bright spirals on the divertor floor and ceiling [1,2]. The flow of HHFW power from the antenna region to the divertor is mostly aligned along the SOL magnetic field [3], which explains the pattern of heat deposition as measured with infrared (IR) cameras. By tracing field lines from the divertor back to the midplane, the IR data can be used to estimate the profile of HHFW power coupled to SOL field lines. We hypothesize that surface waves are being excited in the SOL, and these results should benchmark advanced simulations of the RF power deposition in the SOL (e.g., [4]). Minimizing this loss is critical optimal high-power long-pulse ICRF heating on ITER while guarding against excessive divertor erosion.[4pt] [1] J.C. Hosea et al., AIP Conf Proceedings 1187 (2009) 105. [0pt] [2] G. Taylor et al., Phys. Plasmas 17 (2010) 056114. [0pt] [3] R.J. Perkins et al., to appear in Phys. Rev. Lett. [0pt] [4] D.L. Green et al., Phys. Rev. Lett. 107 (2011) 145001.

  18. 40Ar/39Ar dating of basaltic dykes swarm in Western Cameroon: Evidence of Late Paleozoic and Mesozoic magmatism in the corridor of the Cameroon Line

    NASA Astrophysics Data System (ADS)

    Tchouankoue, Jean Pierre; Simeni Wambo, Nicole Armelle; Kagou Dongmo, Armand; Li, Xian-Hua

    2014-05-01

    40Ar/39Ar ages of three basalt dykes that intrude the Precambrian basement in the southern continental part of the Cretaceous Cameroon Line are presented. Specimen were sampled at Dschang, Maham and Kendem (Cameroon). The ages obtained are 421.3 ± 3.5 Ma (Dschang), 404.22 ± 3.51 Ma (Maham), and 192.10 ± 7.45 Ma (Kendem). The Dschang and Maham samples yield a relatively undisturbed spectrum while the Kendem sample shows an excess of argon but with plateau ages in the frame of the Mesozoic. Plateau ages at Dschang, Maham and Kendem represent more than 80% of the total 39Ar released and are interpreted as emplacement ages. 40Ar/39Ar dating results confirm Devonian and Jurassic K/Ar ages obtained from similar dykes of the same region. Geochemically, the basalt dykes are subalkaline in composition with 45-50 wt.% SiO2. Incompatible trace elements and rare earth elements are lower than that of the Cameroon Line basalts. Overall geochemical characteristics of the basalt dykes much more closely resemble those of tholeiites of the Benue Through in Nigeria that are interpreted as related to the opening of the Atlantic Ocean. The combination of 40Ar/39Ar ages, major, trace and rare earth elements geochemistry data demonstrate a magmatic phase that is significantly older and different of that of the Cretaceous Cameroon Line and younger than the dominantly granitic Neoproterozoic to early Paleozoic magmatism in the region. These findings offer new clues for a better understanding of the tectonic history of the region, particularly the origin of the Cameroon Line and Africa-South America pre-drift reconstitutions.

  19. Corridors cause differential seed predation.

    SciTech Connect

    Orrock, John L.; Damschen, Ellen I.

    2005-06-01

    Orrock, John, L., and Ellen I. Damschen. 2005. Corridors cause differential seed predation. Ecol. Apps. 15(3):793-798. Abstract. Corridors that connect disjunct populations are heavily debated in conservation, largely because the effects of corridors have rarely been evaluated by replicated, large-scale studies. Using large-scale experimental landscapes, we found that, in addition to documented positive effects, corridors also have negative impacts on bird-dispersed plants by affecting seed predation, and that overall predation is a function of the seeds primary consumer (rodents or arthropods). Both large-seeded Prunus serotina and small-seeded Rubus allegheniensis experienced greater predation in connected patches. However, P. serotina experienced significantly less seed predation compared to R. allegheniensis in unconnected patches, due to decreased impacts of rodent seed predators on this large-seeded species. Viewed in light of previous evidence that corridors have beneficial impacts by increasing pollination and seed dispersal, this work demonstrates that corridors may have both positive and negative effects for the same plant species at different life stages. Moreover, these effects may differentially affect plant species within the same community: seeds primarily consumed by rodents suffer less predation in unconnected patches. By shifting the impact of rodent and arthropod seed predators, corridors constructed for plant conservation could lead to shifts in the seed bank.

  20. Environmental impacts of pipeline corridors in the Mojave Desert, California

    SciTech Connect

    Wilshire, H.G. )

    1992-01-01

    Three recently-built gas and oil pipelines that cross the Mojave Desert have graded constructed zones averaging 107 feet wide (range 68--200) on terrain of low relief, and 135 feet (range 77--273) on steeper terrain. Where corridors overlap, the graded width of two pipelines combined averages 157 feet (range 100--388). Right Of Way (ROW) Grants stipulate ROWs 50 feet wide, with an extra 25 feet allowed for construction. Pre- and post-construction measurements on one pipeline show that the width of the graded corridor exceeds the surveyed width by about 21%. A moderate rainstorm of 4 hr duration in the Tehachapi Mtns. eroded about 120 tons/ac to 250 tons/ac of soil from one pipeline corridor, measured on 3 transects across steep slopes. Especially in the western Mojave Desert, the pipeline corridors remain vulnerable to wind erosion for at least 5 years, and thus pose hazards to traffic on nearby highways. Pipeline corridors that pass through areas of stable eolian deposits are undergoing active erosion that expands by undercutting roots and sandblasting plants on downwind sides of the corridors, and by burial of plants beneath drifts. Techniques used to clear vegetation from construction corridors range from deep bulldozing to those designed to remove foliage while leaving root systems intact; the former technique guarantees long-term impacts, but the latter technique may have been defeated by final grading. Problems arise from failure to implement existing mitigations, inadequacies in environmental stipulations, and inadequacies in engineering oversight. Environmental benefits can be achieved by reducing or eliminating the practice of mechanical grading of the corridor, and by placing ditch lines of subsequent pipelines within existing 50 ft. ROWs and limiting construction disturbance to the existing disturbed zone.

  1. 2. VIEW OF NORTHWEST CORNER OF MST. POWER LINES TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW OF NORTHWEST CORNER OF MST. POWER LINES TO CAMERA TOWER IN FOREGROUND; UMBILICAL MAST ON RIGHT SIDE OF PHOTOGRAPH. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  2. Power line carrier interference from HVDC converter terminals

    SciTech Connect

    Tatro, P.J.; Adamson, K.A. ); Eitzmann, M.A.; Smead, M. . Power Systems Engineering Dept.)

    1993-07-01

    Power line carrier (PLC) equipment typically operates in the frequency range from 25 kHz to 300 kHz. Interference studies for HVDC converters usually concentrate on interference from noise sources within this frequency range. However, operating experience at the Sandy Pond converter terminal has indicated that PLC equipment is also susceptible to interference from sources of power system harmonics below the PLC frequency range. Extensive field testing and analytical studies have shown that each PLC circuit has a resonant frequency below the operating frequency. If excited at this resonant frequency, high voltages may exist within the PLC circuit. The resulting saturation of PLC components leads to local generation of radio frequency (RF) noise that interferes with proper operation of PLC circuits. Sources of power system harmonics in the 3-10 kHz range, such as line commutated dc converters, are potential sources of this type of interference.

  3. Limiting electric fields of HVDC overhead power lines.

    PubMed

    Leitgeb, N

    2014-05-01

    As a consequence of the increased use of renewable energy and the now long distances between energy generation and consumption, in Europe, electric power transfer by high-voltage (HV) direct current (DC) overhead power lines gains increasing importance. Thousands of kilometers of them are going to be built within the next years. However, existing guidelines and regulations do not yet contain recommendations to limit static electric fields, which are one of the most important criteria for HVDC overhead power lines in terms of tower design, span width and ground clearance. Based on theoretical and experimental data, in this article, static electric fields associated with adverse health effects are analysed and various criteria are derived for limiting static electric field strengths. PMID:24573710

  4. Interstate power plants 8-inch HDPE gas feeder line

    SciTech Connect

    Not Available

    1982-07-01

    Interstate Power Co.'s newly laid 8-in. high density polyethylene gas feeder line on the banks of the Mississippi River from Savanna to Thomson, IL., has an expected minimum 100-year lifetime. Serving a rapidly growing industrial and residential area, the 9.5-mile distribution line is initially operating as a 60-psi system, although it is ultimately designed for 82-psi service obtained by using Plexco PE 3406/3408 pipe with a 0.639-in.-thick wall and weighing 7 lb/ft. The Thomson line is the first time Interstate has planted 8-in. pipe using a Vermeer T600C ladder trencher. Lower material and labor costs make the plastic line only 65% of the installed cost of a comparable steel pipeline.

  5. Corridor Displays in Glass Cabinets

    ERIC Educational Resources Information Center

    Matthews, Lee D.

    1976-01-01

    Reports on the increased enthusiasm of college students toward physics following the development of student-activated corridor display units. Includes a listing of displays and comments on student reactions. (CP)

  6. Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council

    SciTech Connect

    Kuiper, James A.; Cantwell, Brian J.; Hlava, Kevin J.; Moore, H Robert; Orr, Andrew B.; Zvolanek, Emily A.

    2014-02-24

    analyze the proposed energy corridors in the WECC report in five topic areas: Federal land jurisdiction, Existing Section 368 corridors, Existing transmission lines, Previously studied corridor locations, and Protected areas. Analysis methods are explained and tables and maps are provided to describe the results of the analyses in all five topic areas. WECC used a rational approach to connecting the hubs it identified, although there may be opportunities for adapting some of the proposed WECC routes to previously designated Section 368 corridors, for example: The WECC proposed energy corridors are in fact centerlines of proposed routes connecting hubs of various descriptions related to electric energy transmission. Although the centerlines were sited to avoid sensitive areas, infrastructure proposed within actual pathways or corridors defined by the centerlines would sometimes affect lands where such development would not normally be allowed, such as National Parks and Monuments, National Wildlife Refuges, and Wilderness Areas. Many WECC proposed energy corridors are sited along centerlines of existing roads, including Interstate Highways, where in some cases additional width to accommodate energy transmission infrastructure may not be available. Examples include the WECC Proposed Corridor along Interstate 70 through Glenwood Canyon in Colorado, and along U.S. Highway 89 across Glen Canyon Dam in Arizona. Several WECC proposed energy corridors are parallel to designated Section 368 corridors that have already cleared the preliminary steps to right-of-way approval. In many of these cases, the WECC hub connection objectives can be met more efficiently by routing on the designated Section 368 corridors.

  7. HIGH FREQUENCY POWER TRANSMISSION LINE FOR CYCLOTRONS AND THE LIKE

    DOEpatents

    Armstrong, W.J.

    1954-04-20

    High-frequency power transmission systems, particularly a stacked capacitance alternating power current transmission line wherein maximum utilization of the effective conductios skin of the line conductors is achieved while enabling a low impedance to be obtained are reported. The transmission line consists of a number of flat metal strips with interleaved dielectric strips. The metal dielectric strips are coiled spirally with the axis of the spiral extending along the length of the strips, and the alternating metal strips at the output end have outwardly extending aligned lugs which are directly strapped together and connected to the respective terminals on the load. At the input end of the transmission line, similarly, the alternate metal strips are directly strapped together and connected to an altereating current source. With the arrangement described each metal strip conducts on both sides, so that the metal strips are designed to have a thickness corresponding to twice the depth of the "skin effect" conducting lamina of each conductor at the source frequency.

  8. Analysis of a high power microwave radial line slot antenna.

    PubMed

    Peng, Shengren; Yuan, Chengwei; Shu, Ting

    2013-07-01

    A traditional radial line slot antenna (RLSA) is a high gain planar array. To improve the power handling capacity, we design a radial line slow wave structure which replaces a traditional dielectric sheet in the radial waveguide of the traditional RLSA. This high power microwave (HPM) RLSA is fed from a double-layered radial line waveguide to realize the directional radiation of the microwave. However, the track of the widen slot array on the upper waveguide could cause large reflection, which disturbs the normal antenna operation, accordingly a reflection canceling slot is added to the lower waveguide, the key technology employed in the design of the HPM RLSA and the antenna return-loss is effectively improved. This article mainly gives the design theory of this antenna, which is confirmed by the simulations and experiments. At 9.4 GHz, the calculated aperture efficiency reaches more than 40%, the reflectance is less than 0.1, the radiation efficiency is more than 99% and its measured power-handling capacity exceeds 700 MW. PMID:23902089

  9. Analysis of a high power microwave radial line slot antenna

    NASA Astrophysics Data System (ADS)

    Peng, Shengren; Yuan, Chengwei; Shu, Ting

    2013-07-01

    A traditional radial line slot antenna (RLSA) is a high gain planar array. To improve the power handling capacity, we design a radial line slow wave structure which replaces a traditional dielectric sheet in the radial waveguide of the traditional RLSA. This high power microwave (HPM) RLSA is fed from a double-layered radial line waveguide to realize the directional radiation of the microwave. However, the track of the widen slot array on the upper waveguide could cause large reflection, which disturbs the normal antenna operation, accordingly a reflection canceling slot is added to the lower waveguide, the key technology employed in the design of the HPM RLSA and the antenna return-loss is effectively improved. This article mainly gives the design theory of this antenna, which is confirmed by the simulations and experiments. At 9.4 GHz, the calculated aperture efficiency reaches more than 40%, the reflectance is less than 0.1, the radiation efficiency is more than 99% and its measured power-handling capacity exceeds 700 MW.

  10. Strategy for the Identification of an INL Comprehensive Utility Corridor

    SciTech Connect

    John Reisenauer

    2011-05-01

    This report documents the strategy developed to identify a comprehensive utility corridor (CUC) on the Idaho National Laboratory (INL) Site. The strategy established the process for which the Campus Development Office will evaluate land management issues. It is a process that uses geographical information system geospatial technology to layer critical INL mission information in a way that thorough evaluations can be conducted and strategies developed. The objective of the CUC Project was to develop a process that could be implemented to identify potential utility corridor options for consideration. The process had to take into account all the missions occurring on the INL and other land-related issues. The process for developing a CUC strategy consists of the following four basic elements using geographical information system capabilities: 1. Development of an INL base layer map; this base layer map geospatially references all stationary geographical features on INL and sitewide information. 2. Development of current and future mission land-use need maps; this involved working with each directorate to identify current mission land use needs and future land use needs that project 30 years into the future. 3. Development of restricted and potential constraint maps; this included geospatially mapping areas such as wells, contaminated areas, firing ranges, cultural areas, ecological areas, hunting areas, easement, and grazing areas. 4. Development of state highway and power line rights of way map; this included geospatially mapping rights-of-way along existing state highways and power lines running through the INL that support INL operations. It was determined after completing and evaluating the geospatial information that the area with the least impact to INL missions was around the perimeter of the INL Site. Option 1, in this document, identifies this perimeter; however, it does not mean the entire perimeter is viable. Many places along the perimeter corridor cannot

  11. Corridor use by Asian elephants.

    PubMed

    Pan, Wenjing; Lin, Liu; Luo, Aidong; Zhang, Li

    2009-06-01

    There are 18 km of Kunming-Bangkok Highway passing through the Mengyang Nature Reserve of Xishuangbanna National Nature Reserve in Yunnan Province, China. From September 2005 to September 2006 the impact of this highway on movement of wild Asian elephants between the eastern and western part of the nature reserve was studied using track transecting, rural surveys and direct monitoring. Our results showed that the number of crossroad corridors used by Asian elephants diminished from 28 to 23 following the construction of the highway. In some areas, the elephant activity diminished or even disappeared, which indicated a change in their home ranges. The utilization rate of artificial corridors was 44%. We also found that elephants preferred artificial corridors that were placed along their original corridors. During the research, wild elephants revealed their adaptation to the highway. They were found walking across the highway road surface many times and for different reasons. We suggest that the highway management bureau should revise their management strategies to mitigate the potential risks caused by elephants on the road for the safety of the public and to protect this endangered species from harm. It is also very important to protect and maintain current Asian elephants corridors in this region. PMID:21392292

  12. Investigation of a stripline transmission line structure for gyromagnetic nonlinear transmission line high power microwave sources

    NASA Astrophysics Data System (ADS)

    Reale, D. V.; Parson, J. M.; Neuber, A. A.; Dickens, J. C.; Mankowski, J. J.

    2016-03-01

    A stripline gyromagnetic nonlinear transmission line (NLTL) was constructed out of yttrium iron garnet ferrite and tested at charge voltages of 35 kV-55 kV with bias fields ranging from 10 kA/m to 20 kA/m. Typically, high power gyromagnetic NLTLs are constructed in a coaxial geometry. While this approach has many advantages, including a uniform transverse electromagnetic (TEM) mode, simple interconnection between components, and the ability to use oil or pressurized gas as an insulator, the coaxial implementation suffers from complexity of construction, especially when using a solid insulator. By moving to a simpler transmission line geometry, NLTLs can be constructed more easily and arrayed on a single substrate. This work represents a first step in exploring the suitability of various transmission line structures, such as microstrips and coplanar waveguides. The resulting high power microwave (HPM) source operates in ultra high frequency (UHF) band with an average bandwidth of 40.1% and peak rf power from 2 MW to 12.7 MW.

  13. Investigation of a stripline transmission line structure for gyromagnetic nonlinear transmission line high power microwave sources.

    PubMed

    Reale, D V; Parson, J M; Neuber, A A; Dickens, J C; Mankowski, J J

    2016-03-01

    A stripline gyromagnetic nonlinear transmission line (NLTL) was constructed out of yttrium iron garnet ferrite and tested at charge voltages of 35 kV-55 kV with bias fields ranging from 10 kA/m to 20 kA/m. Typically, high power gyromagnetic NLTLs are constructed in a coaxial geometry. While this approach has many advantages, including a uniform transverse electromagnetic (TEM) mode, simple interconnection between components, and the ability to use oil or pressurized gas as an insulator, the coaxial implementation suffers from complexity of construction, especially when using a solid insulator. By moving to a simpler transmission line geometry, NLTLs can be constructed more easily and arrayed on a single substrate. This work represents a first step in exploring the suitability of various transmission line structures, such as microstrips and coplanar waveguides. The resulting high power microwave (HPM) source operates in ultra high frequency (UHF) band with an average bandwidth of 40.1% and peak rf power from 2 MW to 12.7 MW. PMID:27036802

  14. Investigation into the Effects of Microsecond Power Line Transients on Line-Connected Capacitors

    NASA Technical Reports Server (NTRS)

    Javor, K.

    2000-01-01

    An investigation was conducted into the effect of power-line transients on capacitors used by NASA and installed on platform primary power inputs to avionics. The purpose was to investigate whether capacitor voltage ratings needs to be derated for expected spike potentials. Concerns had been voiced in the past by NASA suppliers that MIL-STD-461 CS06-like requirements were overly harsh and led to physically large capacitors. The author had previously predicted that electrical-switching spike requirements representative of actual power-line transient potentials, durations. and source impedance would require no derating. This investigation bore out that prediction. It was further determined that traditional low source impedance CS06-like transients also will not damage a capacitor, although the spikes themselves are not nearly as well filtered. This report should be used to allay fears that CS06-like requirements drive capacitor voltage derating. Only that derating required by the relatively long duration transients in power quality specification need concern the equipment designer.

  15. Investigation Into The Effects of Microsecond Power Line Transients On Line-Connected Capacitors

    NASA Technical Reports Server (NTRS)

    Javor, Ken

    1999-01-01

    An investigation was conducted into the effect of power-line transients on capacitors used by NASA and installed on platform primary power inputs to avionics. The purpose was to investigate whether capacitor voltage rating needs to be derated for expected spike potentials. Concerns had been voiced in the past by NASA suppliers that MIL-STD-461 CS06-like requirements were overly harsh and led to physically large capacitors. The author had previously predicted that electrical-switching spike requirements representative of actual power-line transient potentials, durations and source impedance would require no derating. This investigation bore out that prediction. It was further determined that traditional low source impedance CS06-like transients also will not damage a capacitor, although the spikes themselves are not nearly as well filtered. This report should be used to allay fears that CS06-like requirements drive capacitor voltage derating. Only that derating required by the relatively long duration transients in power quality specification need concern the equipment designer.

  16. Predicting ice accretion and alleviating galloping on overhead power lines

    NASA Astrophysics Data System (ADS)

    Lu, Mingliang

    2002-04-01

    Both the static and dynamic effects of an ice storm on an overhead power line are investigated fairly comprehensively in this thesis. To determine the static, extreme ice load as well as the combined ice and wind load, a systematic procedure is established based on extensive freezing rain experiments and a Monte Carlo simulation. On the other hand, a dynamic effect---galloping---is examined quite extensively with the objective of better understanding its behavior. A novel add-on device---the hybrid nutation damper (HND)---is proposed to control galloping. Its effectiveness is assessed numerically by using a modified, 3DOF based, galloping software. The present investigations lead to the following findings. (i) Goodwin's simple theoretical model surprisingly predicts, quite accurately, the temporally changing weight of not only a dry ice growth but also a wet ice growth for a fixed, unheated conductor sample. (ii) The maximum ice loading may vary significantly over a power line's planned lifetime because of the randomness of an ice storm and its characteristics as well as the uncertainty involved in identifying the extreme probability distribution of the ice loading. Consequently, backup protection is presently essential for a power line in an ice prone area. (iii) A conductor's torsional flexibility does not appear to affect the growth of the accreted ice weight but it modifies the ice shape significantly. (iv) Three representative ice shapes (a crescent, D-like and icicle pendant) can initiate galloping so that galloping may occur in any icing condition. (v) A noticeable swingback or twist appears to develop only when their respective natural frequencies coincide with the plunge's natural frequency. (vi) A hydraulic jump is the major source of energy dissipation in a nutation damper. A properly induced rotation can significantly enhance a nutation damper's performance. (vii) A hybrid nutation damper has been demonstrated to be a promising means of alleviating

  17. Trend on High-speed Power Line Communication Technology

    NASA Astrophysics Data System (ADS)

    Ogawa, Osamu

    High-speed power line communication (PLC) is useful technology to easily build the communication networks, because construction of new infrastructure is not necessary. In Europe and America, PLC has been used for broadband networks since the beginning of 21th century. In Japan, high-speed PLC was deregulated only indoor usage in 2006. Afterward it has been widely used for home area network, LAN in hotels and school buildings and so on. And recently, PLC is greatly concerned as communication technology for smart grid network. In this paper, the author surveys the high-speed PLC technology and its current status.

  18. 1. Operating Floor Front (east) Corridor, view to the north. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Operating Floor Front (east) Corridor, view to the north. The wall of turbine Unit 1 is visible in left foreground of photograph. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  19. Corridor location: the multi-gateway shortest path model

    NASA Astrophysics Data System (ADS)

    Scaparra, Maria P.; Church, Richard L.; Medrano, F. Antonio

    2014-07-01

    The problem of corridor location can be found in a number of fields including power transmission, highways, and pipelines. It involves the placement of a corridor or rights-of-way that traverses a landscape starting at an origin and ending at a destination. Since most systems are subject to environmental review, it is important to generate competitive, but different alternatives. This paper addresses the problem of generating efficient, spatially different alternatives to the corridor location problem. We discuss the weaknesses in current models and propose a new approach which is designed to overcome many of these problems. We present an application of this model to a real landscape and compare the results to past work. Overall, the new model called the multi-gateway shortest path problem can generate a wide variety of efficient alignments, which eclipse what could be generated by past work.

  20. PCF based high power narrow line width pulsed fiber laser

    NASA Astrophysics Data System (ADS)

    Chen, H.; Yan, P.; Xiao, Q.; Wang, Y.; Gong, M.

    2012-09-01

    Based on semiconductor diode seeded multi-stage cascaded fiber amplifiers, we have obtained 88-W average power of a 1063-nm laser with high repetition rate of up to 1.5 MHz and a constant 2-ns pulse duration. No stimulated Brillouin scattering pulse or optical damage occurred although the maximum pulse peak power has exceeded 112 kW. The output laser exhibits excellent beam quality (M2x = 1.24 and M2y = 1.18), associated with a spectral line width as narrow as 0.065 nm (FWHM). Additionally, we demonstrate high polarization extinction ratio of 18.4 dB and good pulse stabilities superior to 1.6 % (RMS).

  1. Power line field sensing to support autonomous navigation of small unmanned aerial vehicles

    NASA Astrophysics Data System (ADS)

    Matthews, John; Bukshpun, Leonid; Pradhan, Ranjit

    2013-06-01

    Autonomous navigation around power lines in a complex urban environment is a critical challenge facing small unmanned aerial vehicles (SUAVs). As part of an ongoing development of an electric and magnetic field sensor system designed to provide SUAVs with the capability to sense and avoid power transmission and distribution lines by monitoring their electric and magnetic field signatures, we have performed field measurements and analysis of power-line signals. We discuss the nature of the power line signatures to be detected, and optimal strategies for detecting these signals amid SUAV platform noise and environmental interference. Based on an analysis of measured power line signals and vehicle noise, we have found that, under certain circumstances, power line harmonics can be detected at greater range than the fundamental. We explain this phenomenon by combining a model of power line signal nonlinearity with the quasi-static electric and magnetic signatures of multiphase power lines.

  2. A Line Weighted Frequency Droop Controller for Decentralized Enforcement of Transmission Line Power Flow Constraints in Inverter-Based Networks

    SciTech Connect

    Ainsworth, Nathan G; Grijalva, Prof. Santiago

    2013-01-01

    Recent works have shown that networks of voltagesource inverters implementing frequency droop control may be analyzed as consensus-like networks. Based on this understanding, we show that enforcement of network line power flows can be viewed as an edge-preservation problem in a -disk dynamic interaction graph. Inspired by other works solving similar problems in other domains, we propose a line weighted frequency droop controller such that a network of all active buses implementing this controller enforces the specified line power flow constraints without need for communication. We provide simulation results verifying that our proposed controller limits line power to enforce constraints, and otherwise acts as a traditional droop controller.

  3. Research of on-line detection system for power capacitor

    NASA Astrophysics Data System (ADS)

    Yao, Junda; Qian, Zheng; Yu, Hao; Xia, Jiuyun

    2016-01-01

    The hidden danger exists in the power capacitor of power system due to long-time operation under the environment of high voltage. Thus, it is possible to induce serious fault, and the on-line detection system is urgently required. In this paper, two methods of the on-line detection system are compared in order to realize the better real-time condition detection. The first method is based on the STM microprocessor with an internal 12 bit A/D converter, which converts analog signals which is arrived from the sample circuit into digital signals, and then the FFT algorithm is used to accomplish the measurement of the voltage and current values of the capacitor. The second method is based on the special electric energy metering IC, which can obtain RMS (Root Mean Square) of voltage and current by processing the sampled data of the voltage and current, and store RMS of voltage and current in its certain registers. The operating condition of the capacitor can be obtained after getting the values of voltage and current. By comparing the measuring results of two methods, the second method could achieve a higher measurement accuracy and more simple construction.

  4. Fast Burst Synchronization for Power Line Communication Systems

    NASA Astrophysics Data System (ADS)

    Bumiller, Gerd; Lampe, Lutz

    2007-12-01

    Fast burst synchronization is an important requirement in asynchronous communication networks, where devices transmit short data packets in an unscheduled fashion. Such a synchronization is typically achieved by means of a preamble sent in front of the data packet. In this paper, we study fast burst synchronization for power line communication (PLC) systems operating below 500 kHz and transmitting data rates of up to about 500 kbps as it is typical in various PLC network applications. In particular, we are concerned with the receiver processing of the preamble signal and the actual design of preambles suitable for fast burst synchronization in such PLC systems. Our approach is comprehensive in that it takes into account the most distinctive characteristics of the power line channel, which are multipath propagation, highly varying path loss, and disturbance by impulse noise, as well as important practical constraints, especially the need for spectral shaping of the preamble signal and fast adjustment of the automatic gain control (AGC). In fact, we regard the explicit incorporation of these various requirements into the preamble design as the main contribution of this work. We devise an optimization criterion and a stochastic algorithm to search for suitable preamble sequences. A comprehensive performance comparison of a designed and two conventional preambles shows that the designed sequence is superior in terms of (a) fast burst synchronization in various transmission environments, (b) fast AGC adjustment, and (c) compliance of its spectrum with the spectral mask applied to the data transmit signal.

  5. New live line tester for porcelain suspension insulators on high-voltage power lines

    SciTech Connect

    Vaillancourt, G.H.; St-Jean, M. ); Bellerive, J.P. ); Jean, C. )

    1994-01-01

    Suspension insulator assemblies known as insulator strings are used in overhead power transmission lines to mechanically support high-voltage conductors while providing adequate insulation to withstand switching and lightning overvoltages. Since the useful life in service of the individual insulator elements making up these strings is hard to predict, they must be verified periodically to insure that adequate line reliability is maintained at all times. Over the years many testing methods have been used for this purpose, each one with its own advantages and disadvantages. Until now at Hydro-Quebec, porcelain insulators had been tested by the buzz method which simply consists of applying a short-circuit to each insulator in a string and listening for a buzz-like sound indicating a good insulator. However, safety considerations that preclude short-circuiting insulators and other disadvantages of that method have led Hydro-Quebec to undertake and complete the development of a new insulator tester. The working principle of this new device is based on the automatic measurement and recording of the electric field along the insulator string which decreases considerably in front of an internally-shorted insulator. The tester is slid along the string while the insulators are counted automatically. The information from tests on up to 200 strings can be stored in the device to be later transferred in a host computer for interpretation and/or permanent storage. The new tester also gives information on voltage distribution along the insulator strings which can be useful for the design of future power transmission lines.

  6. Evaluaton of working techniques using teleoperation for power line maintenance

    NASA Astrophysics Data System (ADS)

    Lessard, Jean; Robert, Jean-Marc; Rondot, Pascale

    1995-12-01

    The focus of this study is the application of teleoperation to live-line maintenance work on power distribution lines. The research team's objectives are to measure and compare human performance, the levels of mental workload and the degree of satisfaction corresponding to three working techniques: the hot-stick technique (S), the direct-vision teleoperation technique with and without force feedback (T1 and T2, respectively) and the ground-level teleoperation technique (G). Three linemen with substantial experience with S, little experience with T1 and none with T2 or G took part in a study in which they had to perform a typical task with each of the three techniques. The results show that, compared to S, the productivity ratios for teleoperation are approximately 0.6 for T1, 0.5 for T2 and 0.3 for G. Extrapolation of the results shows that these productivity levels will increase with practice but not to the point where the teleoperation techniques would be as rapid as the hot- stick technique. Technical improvements in the near future are expected to help increase these ratios. The mental workload is higher with T2 and G than with S and T1. Lastly, T1 is the preferred technique and T2 the least appreciated.

  7. Potential negative ecological effects of corridors.

    PubMed

    Haddad, Nick M; Brudvig, Lars A; Damschen, Ellen I; Evans, Daniel M; Johnson, Brenda L; Levey, Douglas J; Orrock, John L; Resasco, Julian; Sullivan, Lauren L; Tewksbury, Josh J; Wagner, Stephanie A; Weldon, Aimee J

    2014-10-01

    Despite many studies showing that landscape corridors increase dispersal and species richness for disparate taxa, concerns persist that corridors can have unintended negative effects. In particular, some of the same mechanisms that underlie positive effects of corridors on species of conservation interest may also increase the spread and impact of antagonistic species (e.g., predators and pathogens), foster negative effects of edges, increase invasion by exotic species, increase the spread of unwanted disturbances such as fire, or increase population synchrony and thus reduce persistence. We conducted a literature review and meta-analysis to evaluate the prevalence of each of these negative effects. We found no evidence that corridors increase unwanted disturbance or non-native species invasion; however, these have not been well-studied concerns (1 and 6 studies, respectively). Other effects of corridors were more often studied and yielded inconsistent results; mean effect sizes were indistinguishable from zero. The effect of edges on abundances of target species was as likely to be positive as negative. Corridors were as likely to have no effect on antagonists or population synchrony as they were to increase those negative effects. We found 3 deficiencies in the literature. First, despite studies on how corridors affect predators, there are few studies of related consequences for prey population size and persistence. Second, properly designed studies of negative corridor effects are needed in natural corridors at scales larger than those achievable in experimental systems. Third, studies are needed to test more targeted hypotheses about when corridor-mediated effects on invasive species or disturbance may be negative for species of management concern. Overall, we found no overarching support for concerns that construction and maintenance of habitat corridors may result in unintended negative consequences. Negative edge effects may be mitigated by widening

  8. HANFORD SITE RIVER CORRIDOR CLEANUP

    SciTech Connect

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

  9. Biological effects of power line fields: New York State Power Lines Project Scientific Advisory Panel: Final report

    SciTech Connect

    Ahlbom, A.; Albert, E.N.; Fraser-Smith, A.C.; Grodzinsky, A.J.; Marron, M.T.; Martin, A.O.; Persinger, M.A.; Shelanski, M.L.; Wolpow, E.R.

    1987-07-01

    The New York State Power Lines Project was established to conduct research and to review the scientific literature to determine whether health hazards of electric and magnetic fields are possible. Particular attention was directed to the fields generated by 765-kV overhead transmission lines. The research program provided support to 16 research groups studying human, animal and isolated cell sensitivity to electric and magnetic fields. No effects were found on reproduction, growth or development. Several studies showed no evidence of genetic or chromosomal damage that might lead to inherited effects or cause cancer. While most measurements of behavior and brain function did not demonstrate changes, some did show changes that were small but consistent. Some of these appear to result from changes in body rhythms, and might interfere with normal sleep patterns. There were also changes in pain responses and in the ability of rats to learn. A more serious concern comes from a study of cancer in children suggesting that children with leukemia and brain cancer are more likely to live in homes where there are elevated 60-Hz magnetic field levels. Although much more research is needed before the question whether the magnetic fields actually cause or promote cancer can be resolved, the basis for such an hypothesis is now established. 159 refs., 12 figs., 7 tabs.

  10. How Corridors Reduce Indigo Bunting Nest Success.

    SciTech Connect

    Weldon, Aimee, J.

    2006-08-01

    Abstract: Corridors are a popular strategy to conserve biodiversity and promote gene flow in fragmented landscapes. Corridor effectiveness has been bolstered by the fact that no empirical field studies have shown negative effects on populations or communities. I tested the hypothesis that corridors increase nest predation in connected habitat fragments relative to unconnected fragments. I evaluated this hypothesis in a large-scale experimental system of open-habitat fragments that varied in shape and connectivity. Corridors increased nest predation rates in connected fragments relative to unconnected fragments with lower edge:area ratios. Nest predation rates were similar between connected and unconnected fragments with higher edge:area ratios. These results suggest that the increase in predator activity is largely attributable to edge effects incurred through the addition of a corridor. This is the first field study to demonstrate that corridors can negatively impact animal populations occupying connected fragments.

  11. 29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... person with respect to electrical power transmission and distribution confirms that a line is insulated... or registered professional engineer who is a qualified person with respect to electrical power... 29 Labor 8 2014-07-01 2014-07-01 false Power line safety (up to 350 kV)-equipment operations....

  12. 29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... person with respect to electrical power transmission and distribution confirms that a line is insulated... or registered professional engineer who is a qualified person with respect to electrical power... 29 Labor 8 2013-07-01 2013-07-01 false Power line safety (up to 350 kV)-equipment operations....

  13. Power Lines and Crops Can Be Good Neighbors

    SciTech Connect

    2010-08-01

    Two of the Pacific Northwest’s greatest economic assets are its wealth of agriculture and its clean and reliable electricity fueled largely by hydropower. Sometimes the two intersect. Transmission lines carrying electricity to the region’s farms, businesses and homes must, of necessity, span large areas where people grow crops and orchards. To ensure a safe and reliable flow of electricity across these expanses, trees and other vegetation must be managed to certain standards. At the same time, the Bonneville Power Administration — which owns and operates three-quarters of the region’s high-voltage transmission — recognizes the importance of our region’s agricultural bounty. We are committed to working with individuals and agricultural communities to facilitate ongoing land-use activities in transmission rights-of-way as long as those uses are compatible with transmission safety and reliability standards. Our goal with vegetation management is to keep you and your property safe while protecting the reliability of our region’s electricity system. By working together, BPA and landowners can protect the system and public safety.

  14. Inspection Robot Based Mobile Sensing and Power Line Tracking for Smart Grid.

    PubMed

    Byambasuren, Bat-Erdene; Kim, Donghan; Oyun-Erdene, Mandakh; Bold, Chinguun; Yura, Jargalbaatar

    2016-01-01

    Smart sensing and power line tracking is very important in a smart grid system. Illegal electricity usage can be detected by remote current measurement on overhead power lines using an inspection robot. There is a need for accurate detection methods of illegal electricity usage. Stable and correct power line tracking is a very prominent issue. In order to correctly track and make accurate measurements, the swing path of a power line should be previously fitted and predicted by a mathematical function using an inspection robot. After this, the remote inspection robot can follow the power line and measure the current. This paper presents a new power line tracking method using parabolic and circle fitting algorithms for illegal electricity detection. We demonstrate the effectiveness of the proposed tracking method by simulation and experimental results. PMID:26907274

  15. Inspection Robot Based Mobile Sensing and Power Line Tracking for Smart Grid

    PubMed Central

    Byambasuren, Bat-erdene; Kim, Donghan; Oyun-Erdene, Mandakh; Bold, Chinguun; Yura, Jargalbaatar

    2016-01-01

    Smart sensing and power line tracking is very important in a smart grid system. Illegal electricity usage can be detected by remote current measurement on overhead power lines using an inspection robot. There is a need for accurate detection methods of illegal electricity usage. Stable and correct power line tracking is a very prominent issue. In order to correctly track and make accurate measurements, the swing path of a power line should be previously fitted and predicted by a mathematical function using an inspection robot. After this, the remote inspection robot can follow the power line and measure the current. This paper presents a new power line tracking method using parabolic and circle fitting algorithms for illegal electricity detection. We demonstrate the effectiveness of the proposed tracking method by simulation and experimental results. PMID:26907274

  16. Control Quality of a Feedback Control System under Cyclostationary Noise in Power Line Communication

    NASA Astrophysics Data System (ADS)

    Carrizo, Cesar; Kobayashi, Kentaro; Okada, Hiraku; Katayama, Masaaki

    This paper discusses a control system that employs a power line to transfer signals to control the motion of a single machine, and explores the influence of packet losses on the quality of the control. As an example of a controlled system, a controller with a rotary inverted pendulum as a controlled object, is considered. The feedback loop in between is the power line. The control performance is evaluated in the power line cyclostationary noise environment and compared against the performance in a stationary noise environment. As a result, it is confirmed that the power line and its cyclostationary noise features present an advantage against transmission in a channel with stationary noise.

  17. a Meteorological Risk Assessment Method for Power Lines Based on GIS and Multi-Sensor Integration

    NASA Astrophysics Data System (ADS)

    Lin, Zhiyong; Xu, Zhimin

    2016-06-01

    Power lines, exposed in the natural environment, are vulnerable to various kinds of meteorological factors. Traditional research mainly deals with the influence of a single meteorological condition on the power line, which lacks of comprehensive effects evaluation and analysis of the multiple meteorological factors. In this paper, we use multiple meteorological monitoring data obtained by multi-sensors to implement the meteorological risk assessment and early warning of power lines. Firstly, we generate meteorological raster map from discrete meteorological monitoring data using spatial interpolation. Secondly, the expert scoring based analytic hierarchy process is used to compute the power line risk index of all kinds of meteorological conditions and establish the mathematical model of meteorological risk. By adopting this model in raster calculator of ArcGIS, we will have a raster map showing overall meteorological risks for power line. Finally, by overlaying the power line buffer layer to that raster map, we will get to know the exact risk index around a certain part of power line, which will provide significant guidance for power line risk management. In the experiment, based on five kinds of observation data gathered from meteorological stations in Guizhou Province of China, including wind, lightning, rain, ice, temperature, we carry on the meteorological risk analysis for the real power lines, and experimental results have proved the feasibility and validity of our proposed method.

  18. 2. Pipe Floor Front Corridor, view to the northwest, with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Pipe Floor Front Corridor, view to the northwest, with Unit 4 turbine pit visible in right foreground of photograph. One of the governor compressors, originally used as an air blast circuit breaker compressor, is visible in the left foreground with one of the station sump and unwatering pump clusters located just beyond the compressor. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  19. 2. Operating Floor Rear (west) Corridor, view to the south. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Operating Floor Rear (west) Corridor, view to the south. Note the cooling and service water take-off pipes for Unit 4 visible in left foreground of photograph. The deck plating that covers the oil pipes is also visible in the photograph. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  20. Fast Power Line Detection and Localization Using Steerable Filter for Active Uav Guidance

    NASA Astrophysics Data System (ADS)

    Liu, Y.; Mejias, L.; Li, Z.

    2012-08-01

    In this paper we present a fast power line detection and localisation algorithm as well as propose a high-level guidance architecture for active vision-based Unmanned Aerial Vehicle (UAV) guidance. The detection stage is based on steerable filters for edge ridge detection, followed by a line fitting algorithm to refine candidate power lines in images. The guidance architecture assumes an UAV with an onboard Gimbal camera. We first control the position of the Gimbal such that the power line is in the field of view of the camera. Then its pose is used to generate the appropriate control commands such that the aircraft moves and flies above the lines. We present initial experimental results for the detection stage which shows that the proposed algorithm outperforms two state-of-the-art line detection algorithms for power line detection from aerial imagery.

  1. 18 CFR 12.43 - Power and communication lines and gas pipelines.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Power and communication lines and gas pipelines. 12.43 Section 12.43 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER...

  2. 18 CFR 12.43 - Power and communication lines and gas pipelines.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Power and communication lines and gas pipelines. 12.43 Section 12.43 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER...

  3. 18 CFR 12.43 - Power and communication lines and gas pipelines.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Power and communication lines and gas pipelines. 12.43 Section 12.43 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER...

  4. 18 CFR 12.43 - Power and communication lines and gas pipelines.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Power and communication lines and gas pipelines. 12.43 Section 12.43 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER...

  5. 18 CFR 12.43 - Power and communication lines and gas pipelines.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Power and communication lines and gas pipelines. 12.43 Section 12.43 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER...

  6. Using collaborative tools for energy corridor planning.

    SciTech Connect

    Kuiper, J. A.; Cantwell, B.; Hlohowskyj, I.; Krummel, J.; Moore, R.; Sullivan, R.; Environmental Science Division

    2008-01-01

    In November 2007, the Draft Programmatic Environmental Impact Statement on Designation of Energy Corridors on Federal Land in the Western 11 States was released. The draft proposes a network of 6055 miles of energy corridors on lands managed by seven different federal agencies. Determining the proposed locations of the corridors was a large collaborative effort among the agencies and included local, state, and federal land managers. To connect this geographically dispersed group of people, the project team employed a variety of approaches to communicate corridor siting issues, including sharing GIS layers and electronic maps, a downloadable GIS database and ArcReader project, workshops, and Internet webcast teleconferences. This collaborative approach allowed difficult siting issues to be understood and discussed from many perspectives, which resulted in rapid and effective decision making. The result was a proposed corridor system that avoids many sensitive resources and protected lands while accommodating expected energy development.

  7. 78 FR 55249 - Grand Valley Rural Power Lines, Inc., Holy Cross Electric Association, Inc., Intermountain Rural...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... Energy Regulatory Commission Grand Valley Rural Power Lines, Inc., Holy Cross Electric Association, Inc., Intermountain Rural Electric Association, Inc., Yampa Valley Electric Association, Inc. v. Public Service.... 824, 824(e) and 825(e) 2013, Grand Valley Rural Power Lines, Inc., Holy Cross Electric...

  8. Power Line Damage, Electrical Outages Reduced in the ''Sleet Belt'': NICE3 Steel Project Fact Sheet

    SciTech Connect

    2000-04-25

    The AR Windamper System was developed through a grant from the Inventions and Innovation Program, to protect power transmission lines in sleet belt states and provinces by eliminating the ''galloping'' phenomenon. Wind damping products minimize power outages and reduce repair costs to transmission lines.

  9. Research of Characteristics of the Low Voltage Power Line in Underground Coal Mine

    NASA Astrophysics Data System (ADS)

    Wei, Shaoliang; Qin, Shiqun; Gao, Wenchang; Cheng, Fengyu; Cao, Zhongyue

    The power line communications (PLCs) can count on existing electrical connections reaching each corner in the locations where such applications are required, so signal transmission over power lines is nowadays gaining more and more interest for applications like internet. The research of characteristics of the low voltage power line is the fundamental and importance task. This work presents a device to test the characteristics of the low voltage power line. The low voltage power line channel characteristics overground and the channel characteristics underground were tested in using this device. Experiments show that, the characteristics are different between the PLCs channel underground coal mine and the PLC channel overground. Different technology should be adopted to structure the PLCs channel model underground coal mine and transmit high speed digital signal. But how to use the technology better to the high-speed digital communication under coal mine is worth of further studying.

  10. 29 CFR 1926.1409 - Power line safety (over 350 kV).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... professional engineer who is a qualified person with respect to electrical power transmission and distribution. ... 29 Labor 8 2014-07-01 2014-07-01 false Power line safety (over 350 kV). 1926.1409 Section 1926... Construction § 1926.1409 Power line safety (over 350 kV). The requirements of § 1926.1407 and § 1926.1408...

  11. 29 CFR 1926.1409 - Power line safety (over 350 kV).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... professional engineer who is a qualified person with respect to electrical power transmission and distribution. ... 29 Labor 8 2013-07-01 2013-07-01 false Power line safety (over 350 kV). 1926.1409 Section 1926... Construction § 1926.1409 Power line safety (over 350 kV). The requirements of § 1926.1407 and § 1926.1408...

  12. Noise control in the transportation corridor.

    PubMed

    Manning, C J; Harris, G J

    2003-01-01

    This paper considers the opportunities for noise control within the route corridor required for construction of road, rail and other guided transport schemes. It deals with control of noise generation at source, and in the transmission path close to the point of generation. In this way it is possible to control the amount of acoustic power generated, and to absorb part of the radiated power at points of reflection. Purely reflective wayside barriers do little to absorb acoustic energy, merely reflecting it in a different direction. Whilst this has selfish benefits to the receptor in the shadow zone of the barrier, it makes things worse for others on the reflective side of the geometry. The paper therefore considers the options available to the engineer in the design of rolling and sliding interfaces and the use of acoustically absorptive finishes on all surfaces close to the point of noise generation. This includes the running surface itself, structural components, retaining walls, over and under passes, and the inner surfaces of track and wayside barriers. PMID:12631436

  13. Corridor Length and Patch Colonization by a Butterfly Junonia coenia

    SciTech Connect

    Nick Haddad

    2000-06-01

    Habitat corridors have been proposed to reduce patch isolation and increase population persistence in fragmented landscapes. This study tested whether patch colonization was increased by the presence and various length corridors. The specific butterfly species tested has been shown to use corridors, however, the results indicate that neither the distance between patches or the presence of a corridor influenced colonization.

  14. Power market analysis and potential revenues of new transmission lines in a deregulated environment.

    SciTech Connect

    Koritarov, V. S.; Veselka, T. D.; Trouille, B.

    2002-05-15

    This paper describes an approach that was developed to analyze the market potential for power transactions via proposed transmission lines among the electric power utilities of Macedonia, Bulgaria, and Albania. The approach uses an integrated modeling framework consisting of several computer models that estimate the financial and economic benefits of constructing new transmission lines. The integrated model simulates open power markets under several scenarios that include cases with and without the proposed interconnections. The approach estimates power transactions among the three Balkan utility systems and the benefits of coordinated or joint system operations, including short-term power sales agreements.

  15. Application of a power line maintenance information system using OPGW to the Nishi-Gunma UHV line

    SciTech Connect

    Ooura, K.; Kanemaru, K.; Matsubara, R.; Ibuki, S.

    1995-01-01

    Tokyo Electric Power Company, Inc. began operation of the Nishi-Gunma UHV trunk line, the first 1,000 kV-designed power line in Japan, in April, 1992. This line is expected to be the key line in a major trunk-line system that is being developed. It traverses high-altitude mountainous areas subject to severe environmental and meteorological conditions for a long distance. A system using Composite Fiber-optic Overhead Ground Wire (OPGW) is constructed to obtain precise information on this line for maintenance purposes. This system comprises three major functions; (1) meteorological and facility`s monitoring for gathering meteorological data on such elements as winds, and icing and snow accretion, and for evaluating the corresponding reaction of the components such as conductor tension, and strain In the tower structure, (2) Industrial TV (ITV) monitoring for visual observation of weather, surrounding conditions and site facilities, and (3) fault section location for pinpointing faults quickly and determining the maintenance office that should respond to the faults. This Is done by estimating the fault section accurately around the boundaries of the maintenance jurisdictions. This paper describes the development of these functions and results obtained from practical operation.

  16. Gain Purchasing Power the Newfangled Way--On-Line.

    ERIC Educational Resources Information Center

    Milshtein, Amy

    1999-01-01

    Examines how San Diego State University uses computers to cut purchasing costs and boost efficiency and whether their solution can work for other business-to-business needs. How the school developed the totally self-sustaining, on-line and on-time purchasing system is discussed, including solutions to start-up problems. (GR)

  17. Electric Power Lines : Questions and Answers on Research into Health Effects.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-05-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this booklet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

  18. 1. Pipe Floor Rear Corridor, view to the southeast. The ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Pipe Floor Rear Corridor, view to the southeast. The wall of Unit 2 turbine pit is visible in the right foreground. The pipe and valve cluster in the right foreground is part of the blow down valve for Unit 2. This valve allows the water in the draft chest to be lowered (i.e., 'blown down') so that the unit can be motored (i.e., run like an electric motor rather than an electric power generator). - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  19. Wildlife and electric power transmission

    USGS Publications Warehouse

    Ellis, D.H.; Goodwin, J.G., Jr.; Hunt, J.R.

    1978-01-01

    Hundreds of thousands of miles of transmission lines have been introduced into our natural environment. These lines and their corridors can be damaging or beneficial to wildlife communities depending on how they are designed, where they are placed, and when they are constructed and maintained. With the current trend toward UHV systems, new problems (associated with additional increments in audible noise, electric and magnetic force fields, etc.) must be addressed. We recommend the following areas for careful study: (1) the response of wilderness species to transmission lines and line construction and maintenance activities (2) the magnitude of bird collision and electrocution mortality, (3) the response of power corridor and power tower in habiting wildlife to laboratory and field doses of electro-chemical oxidants, corona noise, electric and magnetic fields, etc., (4) the productivity of tower inhabiting birds compared with nearby non-tower nesters, and (5) the influence of powerline corridors on mammalian and avian migration patterns. It is our hope that the questions identified in this study will help stimulate further research so that we can maximize wildlife benefits and minimize wildlife detriments.

  20. Corridor Length and Patch Colonization by a Butterfly, Junonia coenia

    SciTech Connect

    Haddad, N.

    1999-01-22

    Study hypothesized that corridors increase patch colonization by Junonia coenia regardless of insects initial distance from patch, as the butterfly is known to move between patches preferentially through corridors. Neither corridor nor distance had significant effect on patch colonization, but significant interaction between presence or absence of corridors and distance. One critical factor is interpatch distance which may determine the relative effectiveness of corridors and other landscape configurations.

  1. A bee in the corridor: centering and wall-following

    NASA Astrophysics Data System (ADS)

    Serres, Julien R.; Masson, Guillaume P.; Ruffier, Franck; Franceschini, Nicolas

    2008-12-01

    In an attempt to better understand the mechanism underlying lateral collision avoidance in flying insects, we trained honeybees ( Apis mellifera) to fly through a large (95-cm wide) flight tunnel. We found that, depending on the entrance and feeder positions, honeybees would either center along the corridor midline or fly along one wall. Bees kept following one wall even when a major (150-cm long) part of the opposite wall was removed. These findings cannot be accounted for by the “optic flow balance” hypothesis that has been put forward to explain the typical bees’ “centering response” observed in narrower corridors. Both centering and wall-following behaviors are well accounted for, however, by a control scheme called the lateral optic flow regulator, i.e., a feedback system that strives to maintain the unilateral optic flow constant. The power of this control scheme is that it would allow the bee to guide itself visually in a corridor without having to measure its speed or distance from the walls.

  2. An algorithm for power line detection and warning based on a millimeter-wave radar video.

    PubMed

    Ma, Qirong; Goshi, Darren S; Shih, Yi-Chi; Sun, Ming-Ting

    2011-12-01

    Power-line-strike accident is a major safety threat for low-flying aircrafts such as helicopters, thus an automatic warning system to power lines is highly desirable. In this paper we propose an algorithm for detecting power lines from radar videos from an active millimeter-wave sensor. Hough Transform is employed to detect candidate lines. The major challenge is that the radar videos are very noisy due to ground return. The noise points could fall on the same line which results in signal peaks after Hough Transform similar to the actual cable lines. To differentiate the cable lines from the noise lines, we train a Support Vector Machine to perform the classification. We exploit the Bragg pattern, which is due to the diffraction of electromagnetic wave on the periodic surface of power lines. We propose a set of features to represent the Bragg pattern for the classifier. We also propose a slice-processing algorithm which supports parallel processing, and improves the detection of cables in a cluttered background. Lastly, an adaptive algorithm is proposed to integrate the detection results from individual frames into a reliable video detection decision, in which temporal correlation of the cable pattern across frames is used to make the detection more robust. Extensive experiments with real-world data validated the effectiveness of our cable detection algorithm. PMID:21652287

  3. 77 FR 38793 - Grand Valley Rural Power Lines, Inc., Yampa Valley Electric Association, Inc., Intermountain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Energy Regulatory Commission Grand Valley Rural Power Lines, Inc., Yampa Valley Electric Association, Inc., Intermountain Rural Electric Association, Tri-State Generation and Transmission Association, Inc. v. Public... Association, Inc., Intermountain Rural Electric Association, and Tri-State Generation and...

  4. The Power of Quantum Systems on a Line

    NASA Astrophysics Data System (ADS)

    Aharonov, Dorit; Gottesman, Daniel; Irani, Sandy; Kempe, Julia

    2009-04-01

    We study the computational strength of quantum particles (each of finite dimensionality) arranged on a line. First, we prove that it is possible to perform universal adiabatic quantum computation using a one-dimensional quantum system (with 9 states per particle). This might have practical implications for experimentalists interested in constructing an adiabatic quantum computer. Building on the same construction, but with some additional technical effort and 12 states per particle, we show that the problem of approximating the ground state energy of a system composed of a line of quantum particles is QMA-complete; QMA is a quantum analogue of NP. This is in striking contrast to the fact that the analogous classical problem, namely, one-dimensional MAX-2-SAT with nearest neighbor constraints, is in P. The proof of the QMA-completeness result requires an additional idea beyond the usual techniques in the area: Not all illegal configurations can be ruled out by local checks, so instead we rule out such illegal configurations because they would, in the future, evolve into a state which can be seen locally to be illegal. Our construction implies (assuming the quantum Church-Turing thesis and that quantum computers cannot efficiently solve QMA-complete problems) that there are one-dimensional systems which take an exponential time to relax to their ground states at any temperature, making them candidates for being one-dimensional spin glasses.

  5. Avian behavior and mortality at power lines in coastal South Carolina

    USGS Publications Warehouse

    Savereno, A.J.; Savereno, L.A.; Boettcher, R.; Haig, S.M.

    1996-01-01

    We compared avian behavior and mortality associated with two 115-kV transmission lines on the central South Carolina coast during 3,392 hours of observation from May 1991 through May 1994. One line was marked with 30-cm-diameter yellow aviation markers. The second line was unmarked, but was similar in most other aspects. We conducted ground searches (n = 445) beneath each line year-round to document avian mortality due to power-line collisions. At marked lines, birds that approached at line height changed behavior more at unmarked lines (P< 0.001), and fewer crossed between static and conductor wires. Collision rate was 53% lower at marked than unmarked lines. Among collisions at both sites, 82% of birds collided with static wires. Based on observed collisions and carcass recoveries, wading birds particularly appeared to be at risk. We concluded that aviation markers were effective at increasing line visibility and reducing collisions and recommend marking static wires of power lines in potentially sensitive areas.

  6. Performance analysis of radiation cooled dc transmission lines for high power space systems

    NASA Technical Reports Server (NTRS)

    Schwarze, G. E.

    1985-01-01

    As space power levels increase to meet mission objectives and also as the transmission distance between power source and load increases, the mass, volume, power loss, and operating voltage and temperature become important system design considerations. This analysis develops the dependence of the specific mass and percent power loss on the power and voltage levels, transmission distance, operating temperature and conductor material properties. Only radiation cooling is considered since the transmission line is assumed to operate in a space environment. The results show that the limiting conditions for achieving low specific mass, percent power loss, and volume for a space-type dc transmission line are the permissible transmission voltage and operating temperature. Other means to achieve low specific mass include the judicious choice of conductor materials. The results of this analysis should be immediately applicable to power system trade-off studies including comparisons with ac transmission systems.

  7. Performance analysis of radiation cooled dc transmission lines for high power space systems

    NASA Technical Reports Server (NTRS)

    Schwarze, G. E.

    1985-01-01

    As space power levels increase to meet mission objectives and also as the transmission distance between power source and load increases, the mass, volume, power loss, and operating voltage and temperature become important system design considerations. This analysis develops the dependence of the specific mass and percent power loss on hte power and voltage levels, transmission distance, operating temperature and conductor material properties. Only radiation cooling is considered since the transmission line is assumed to operate in a space environment. The results show that the limiting conditions for achieving low specific mass, percent power loss, and volume for a space-type dc transmission line are the permissible transmission voltage and operating temperature. Other means to achieve low specific mass include the judicious choice of conductor materials. The results of this analysis should be immediately applicable to power system trade-off studies including comparisons with ac transmission systems.

  8. Electric Power Lines : Questions and Answers on Research into Health Effects.

    SciTech Connect

    United States. Bonneville Power Administration.

    1993-11-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this pamphlet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. (BPA is the Pacific Northwest`s Federal electric power marketing agency.) First, some basic electrical terms are defined, and electric and magnetic fields are described. Next, answers are given to several questions about recent scientific studies. We then describe how BPA is addressing public concerns raised by these studies. Some important information about electrical safety follows. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this pamphlet.

  9. 29 CFR 1926.1407 - Power line safety (up to 350 kV)-assembly and disassembly.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Cranes and Derricks in Construction § 1926.1407 Power line safety (up to 350 kV)—assembly and disassembly...) Assembly/disassembly below power lines prohibited. No part of a crane/derrick, load line, or load... part of a crane/derrick, load line, or load (including rigging and lifting accessories),...

  10. 29 CFR 1926.1407 - Power line safety (up to 350 kV)-assembly and disassembly.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Cranes and Derricks in Construction § 1926.1407 Power line safety (up to 350 kV)—assembly and disassembly...) Assembly/disassembly below power lines prohibited. No part of a crane/derrick, load line, or load... part of a crane/derrick, load line, or load (including rigging and lifting accessories),...

  11. 29 CFR 1926.1407 - Power line safety (up to 350 kV)-assembly and disassembly.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Cranes and Derricks in Construction § 1926.1407 Power line safety (up to 350 kV)—assembly and disassembly...) Assembly/disassembly below power lines prohibited. No part of a crane/derrick, load line, or load... part of a crane/derrick, load line, or load (including rigging and lifting accessories),...

  12. 29 CFR 1926.1407 - Power line safety (up to 350 kV)-assembly and disassembly.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Cranes and Derricks in Construction § 1926.1407 Power line safety (up to 350 kV)—assembly and disassembly...) Assembly/disassembly below power lines prohibited. No part of a crane/derrick, load line, or load... part of a crane/derrick, load line, or load (including rigging and lifting accessories),...

  13. 29 CFR 1926.1410 - Power line safety (all voltages)-equipment operations closer than the Table A zone.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... accessories) to a complete stop; wind conditions; degree of sway in the power line; lighting conditions, and... 29 Labor 8 2011-07-01 2011-07-01 false Power line safety (all voltages)-equipment operations... FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1410 Power line safety (all...

  14. 29 CFR 1926.1410 - Power line safety (all voltages)-equipment operations closer than the Table A zone.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... accessories) to a complete stop; wind conditions; degree of sway in the power line; lighting conditions, and... 29 Labor 8 2013-07-01 2013-07-01 false Power line safety (all voltages)-equipment operations... FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1410 Power line safety (all...

  15. 29 CFR 1926.1410 - Power line safety (all voltages)-equipment operations closer than the Table A zone.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...; wind conditions; degree of sway in the power line; lighting conditions, and other conditions affecting... 29 Labor 8 2014-07-01 2014-07-01 false Power line safety (all voltages)-equipment operations... FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1410 Power line safety (all...

  16. 29 CFR 1926.1410 - Power line safety (all voltages)-equipment operations closer than the Table A zone.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... accessories) to a complete stop; wind conditions; degree of sway in the power line; lighting conditions, and... 29 Labor 8 2012-07-01 2012-07-01 false Power line safety (all voltages)-equipment operations... FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1410 Power line safety (all...

  17. On-line diagnostic system for power generators

    SciTech Connect

    Skormin, V.A.; Goodenough, G.S.; Huber, R.K.

    1996-12-31

    A novel approach to diagnostics of a power generator is developed. It utilizes readily available data acquired by the existing computer-based monitoring/control system. Diagnostic procedures detect various trends in the generator data and interpret these trends in the generator data and interpret these trends as changes in the generator performance caused by incipient failures. Results of trend analyses, subjected to statistical validation, facilitate failure prediction and identification thus providing the justification for service when needed. The procedures are incorporated in a diagnostic system implemented in a PC interfaced with the existing VAX-based process monitoring and control system. The diagnostic system provides graphical display of the diagnostic messages.

  18. Circuit and Method for Communication Over DC Power Line

    NASA Technical Reports Server (NTRS)

    Krasowski, Michael J.; Prokop, Norman F.

    2007-01-01

    A circuit and method for transmitting and receiving on-off-keyed (OOK) signals with fractional signal-to-noise ratios uses available high-temperature silicon- on-insulator (SOI) components to move computational, sensing, and actuation abilities closer to high-temperature or high-ionizing radiation environments such as vehicle engine compartments, deep-hole drilling environments, industrial control and monitoring of processes like smelting, and operations near nuclear reactors and in space. This device allows for the networking of multiple, like nodes to each other and to a central processor. It can do this with nothing more than the already in-situ power wiring of the system. The device s microprocessor allows it to make intelligent decisions within the vehicle operational loop and to effect control outputs to its associated actuators. The figure illustrates how each node converts digital serial data to OOK 18-kHz in transmit mode and vice-versa in receive mode; though operations at lower frequencies or up to a megahertz are within reason using this method and these parts. This innovation s technique modulates a DC power bus with millivolt-level signals through a MOSFET (metal oxide semiconductor field effect transistor) and resistor by OOK. It receives and demodulates this signal from the DC power bus through capacitive coupling at high temperature and in high ionizing radiation environments. The demodulation of the OOK signal is accomplished by using an asynchronous quadrature detection technique realized by a quasi-discrete Fourier transform through use of the quadrature components (0 and 90 phases) of the carrier frequency as generated by the microcontroller and as a function of the selected crystal frequency driving its oscillator. The detected signal is rectified using an absolute-value circuit containing no diodes (diodes being non-operational at high temperatures), and only operational amplifiers. The absolute values of the two phases of the received signal

  19. A study of electric power transmission lines for use on the lunar surface

    SciTech Connect

    Gordon, L.B.; Gaustad, K.L. )

    1991-01-10

    Analytical models have been developed to study the operating characteristics of electrical transmission lines for use on the lunar surface. Important design considerations for a transmission line operating on the lunar surface are mass, temperature, and efficiency. Transmission line parameters which impact these considerations include voltage, power loss, and waveform. The electrical and thermal models developed are used to calculate transmission line mass, size, and temperature as a function of voltage, geometry, waveform, location, and efficiency. The analyses include AC and DC for above and below ground operation. Geometries studied include a vacuum-insulated, two-wire transmission line and a solid-dielectric insulated, coaxial transmission line. A brief discussion of design considerations and the models developed is followed by results for parameter studies for both DC and AC transmission lines.

  20. An artificial intelligence framework for on-line transient stability assessment of power systems

    SciTech Connect

    Wehenkel, L.; VanCutsem, T.; Ribbens-Pavella, M.

    1989-05-01

    A new framework is proposed to tackle the on-line transient stability problem of power systems. Based on artificial intelligence, it successively makes use of an inductive inference method to automatically build decision rules, and a deductive inference method to apply them on-line. This paper attempts to lay the foundations of an inductive inference method, where the rules explicitly relate a system's stability with relevant static parameters of it. A simple but realistic power system is treated to illustrate important features of the method and to suggest how the derived decision rules could be used on-line.

  1. 78 FR 76140 - Extension of Public Comment Period for the Champlain Hudson Power Express Transmission Line...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ...The U.S. Department of Energy (DOE) is extending the public comment period for the Champlain Hudson Power Express Transmission Line Project Draft Environmental Impact Statement (DOE/EIS-0447). The Draft EIS evaluates the environmental impacts of DOE's proposed Federal action of issuing a Presidential permit to the Applicant, Champlain Hudson Power Express, Inc. (CHPEI), to construct, operate,......

  2. Large-Scale Habitat Corridors for Biodiversity Conservation: A Forest Corridor in Madagascar

    PubMed Central

    Ramiadantsoa, Tanjona; Ovaskainen, Otso; Rybicki, Joel; Hanski, Ilkka

    2015-01-01

    In biodiversity conservation, habitat corridors are assumed to increase landscape-level connectivity and to enhance the viability of otherwise isolated populations. While the role of corridors is supported by empirical evidence, studies have typically been conducted at small spatial scales. Here, we assess the quality and the functionality of a large 95-km long forest corridor connecting two large national parks (416 and 311 km2) in the southeastern escarpment of Madagascar. We analyze the occurrence of 300 species in 5 taxonomic groups in the parks and in the corridor, and combine high-resolution forest cover data with a simulation model to examine various scenarios of corridor destruction. At present, the corridor contains essentially the same communities as the national parks, reflecting its breadth which on average matches that of the parks. In the simulation model, we consider three types of dispersers: passive dispersers, which settle randomly around the source population; active dispersers, which settle only in favorable habitat; and gap-avoiding active dispersers, which avoid dispersing across non-habitat. Our results suggest that long-distance passive dispersers are most sensitive to ongoing degradation of the corridor, because increasing numbers of propagules are lost outside the forest habitat. For a wide range of dispersal parameters, the national parks are large enough to sustain stable populations until the corridor becomes severely broken, which will happen around 2065 if the current rate of forest loss continues. A significant decrease in gene flow along the corridor is expected after 2040, and this will exacerbate the adverse consequences of isolation. Our results demonstrate that simulation studies assessing the role of habitat corridors should pay close attention to the mode of dispersal and the effects of regional stochasticity. PMID:26200351

  3. Power lines, roads, and avian nest survival: effects on predator identity and predation intensity.

    PubMed

    DeGregorio, Brett A; Weatherhead, Patrick J; Sperry, Jinelle H

    2014-05-01

    1 Anthropogenic alteration of landscapes can affect avian nest success by influencing the abundance, distribution, and behavior of predators. Understanding avian nest predation risk necessitates understanding how landscapes affect predator distribution and behavior. 2 From a sample of 463 nests of 17 songbird species, we evaluated how landscape features (distance to forest edge, unpaved roads, and power lines) influenced daily nest survival. We also used video cameras to identify nest predators at 137 nest predation events and evaluated how landscape features influenced predator identity. Finally, we determined the abundance and distribution of several of the principal predators using surveys and radiotelemetry. 3 Distance to power lines was the best predictor of predator identity: predation by brown-headed cowbirds (Molothrus ater), corvids (Corvus sp. and Cyanocitta cristata), racers (Coluber constrictor), and coachwhips (Masticophis flagellum) increased with proximity to power lines, whereas predation by rat snakes (Elaphe obsoleta) and raptors decreased. In some cases, predator density may reliably indicate nest predation risk because racers, corvids, and cowbirds frequently used power line right-of-ways. 4 Of five bird species with enough nests to analyze individually, daily nest survival of only indigo buntings (Passerina cyanea) decreased with proximity to power lines, despite predation by most predators at our site being positively associated with power lines. For all nesting species combined, distance to unpaved road was the model that most influenced daily nest survival. This pattern is likely a consequence of rat snakes, the locally dominant nest predator (28% of predation events), rarely using power lines and associated areas. Instead, rat snakes were frequently associated with road edges, indicating that not all edges are functionally similar. 5 Our results suggest that interactions between predators and landscape features are likely to be specific to

  4. Power lines, roads, and avian nest survival: effects on predator identity and predation intensity

    PubMed Central

    DeGregorio, Brett A; Weatherhead, Patrick J; Sperry, Jinelle H

    2014-01-01

    1 Anthropogenic alteration of landscapes can affect avian nest success by influencing the abundance, distribution, and behavior of predators. Understanding avian nest predation risk necessitates understanding how landscapes affect predator distribution and behavior. 2 From a sample of 463 nests of 17 songbird species, we evaluated how landscape features (distance to forest edge, unpaved roads, and power lines) influenced daily nest survival. We also used video cameras to identify nest predators at 137 nest predation events and evaluated how landscape features influenced predator identity. Finally, we determined the abundance and distribution of several of the principal predators using surveys and radiotelemetry. 3 Distance to power lines was the best predictor of predator identity: predation by brown-headed cowbirds (Molothrus ater), corvids (Corvus sp. and Cyanocitta cristata), racers (Coluber constrictor), and coachwhips (Masticophis flagellum) increased with proximity to power lines, whereas predation by rat snakes (Elaphe obsoleta) and raptors decreased. In some cases, predator density may reliably indicate nest predation risk because racers, corvids, and cowbirds frequently used power line right-of-ways. 4 Of five bird species with enough nests to analyze individually, daily nest survival of only indigo buntings (Passerina cyanea) decreased with proximity to power lines, despite predation by most predators at our site being positively associated with power lines. For all nesting species combined, distance to unpaved road was the model that most influenced daily nest survival. This pattern is likely a consequence of rat snakes, the locally dominant nest predator (28% of predation events), rarely using power lines and associated areas. Instead, rat snakes were frequently associated with road edges, indicating that not all edges are functionally similar. 5 Our results suggest that interactions between predators and landscape features are likely to be specific to

  5. Do power lines and protected areas present a catch-22 situation for Cape vultures (Gyps coprotheres)?

    PubMed

    Phipps, W Louis; Wolter, Kerri; Michael, Michael D; MacTavish, Lynne M; Yarnell, Richard W

    2013-01-01

    Cape vulture Gyps coprotheres populations have declined across their range due to multiple anthropogenic threats. Their susceptibility to fatal collisions with the expanding power line network and the prevalence of carcasses contaminated with illegal poisons and other threats outside protected areas are thought to be the primary drivers of declines in southern Africa. We used GPS-GSM units to track the movements and delineate the home ranges of five adult (mean ±SD minimum convex polygon area = 121,655±90,845 km(2)) and four immature (mean ±SD minimum convex polygon area = 492,300±259,427 km(2)) Cape vultures to investigate the influence of power lines and their use of protected areas. The vultures travelled more than 1,000 km from the capture site and collectively entered five different countries in southern Africa. Their movement patterns and core foraging ranges were closely associated with the spatial distribution of transmission power lines and we present evidence that the construction of power lines has allowed the species to extend its range to areas previously devoid of suitable perches. The distribution of locations of known Cape vulture mortalities caused by interactions with power lines corresponded to the core ranges of the tracked vultures. Although some of the vultures regularly roosted at breeding colonies located inside protected areas the majority of foraging activity took place on unprotected farmland. Their ability to travel vast distances very quickly and the high proportion of time they spend in the vicinity of power lines and outside protected areas make Cape vultures especially vulnerable to negative interactions with the expanding power line network and the full range of threats across the region. Co-ordinated cross-border conservation strategies beyond the protected area network will therefore be necessary to ensure the future survival of threatened vultures in Africa. PMID:24137496

  6. Bird behavior and mortality in relation to power lines in prairie habitats

    USGS Publications Warehouse

    Faanes, C.A.

    1987-01-01

    Research was conducted to determine the magnitude of avian mortality caused by power transmission lines in prairie habitats during the two spring and two fall migration periods between July 1980 and May 1982. Searches for dead birds were made at least twice weekly during each migration period. Study sites were selected to include 'worst-case' situations involving potentially large concentrations of birds.In total, 633 dead birds were found beneath 9.6 km of power lines. About 81% of the birds were found during fall migration. Removal of birds by scavengers was of minor, although local, importance, and observer error in finding birds was greatest in areas of dense vegetation. Total kill was estimated at 1,332 birds.Data were gathered on more than 7,000 bird flights observed in the vicinity of the power lines. Sixty-eight percent of the birds did not respond to the presence of the power lines. Flaring and climbing over the conductor or overhead ground wire occurred in about 25% of the flights. One hundred nine birds in 82 flocks were observed to collide with a power line. Of these birds, 87% flared to climb over the power line before colliding. The overhead ground wire was responsible for most deaths, as 102 of 109 birds collided with it.Whereas none of the mortality observed was considered to be biologically significant at the particular sites examined, the cumulative effect of mortality sustained from collisions with power lines may be important, particularly to populations of rare or endangered birds.

  7. Do Power Lines and Protected Areas Present a Catch-22 Situation for Cape Vultures (Gyps coprotheres)?

    PubMed Central

    Phipps, W. Louis; Wolter, Kerri; Michael, Michael D.; MacTavish, Lynne M.; Yarnell, Richard W.

    2013-01-01

    Cape vulture Gyps coprotheres populations have declined across their range due to multiple anthropogenic threats. Their susceptibility to fatal collisions with the expanding power line network and the prevalence of carcasses contaminated with illegal poisons and other threats outside protected areas are thought to be the primary drivers of declines in southern Africa. We used GPS-GSM units to track the movements and delineate the home ranges of five adult (mean ±SD minimum convex polygon area  =  121,655±90,845 km2) and four immature (mean ±SD minimum convex polygon area  =  492,300±259,427 km2) Cape vultures to investigate the influence of power lines and their use of protected areas. The vultures travelled more than 1,000 km from the capture site and collectively entered five different countries in southern Africa. Their movement patterns and core foraging ranges were closely associated with the spatial distribution of transmission power lines and we present evidence that the construction of power lines has allowed the species to extend its range to areas previously devoid of suitable perches. The distribution of locations of known Cape vulture mortalities caused by interactions with power lines corresponded to the core ranges of the tracked vultures. Although some of the vultures regularly roosted at breeding colonies located inside protected areas the majority of foraging activity took place on unprotected farmland. Their ability to travel vast distances very quickly and the high proportion of time they spend in the vicinity of power lines and outside protected areas make Cape vultures especially vulnerable to negative interactions with the expanding power line network and the full range of threats across the region. Co-ordinated cross-border conservation strategies beyond the protected area network will therefore be necessary to ensure the future survival of threatened vultures in Africa. PMID:24137496

  8. Inductive energy harvesting from variable frequency and amplitude aircraft power lines

    NASA Astrophysics Data System (ADS)

    Toh, T. T.; Wright, S. W.; Kiziroglou, M. E.; Mueller, J.; Sessinghaus, M.; Yeatman, E. M.; Mitcheson, P. D.

    2014-11-01

    This paper presents a non-contact method of harvesting energy from an aircraft power line that has an AC current of variable amplitude and a frequency range of 360-800 Hz. The current and frequency characteristics of the aircraft power line are dependent on the rotation speed of the electrical generators and will therefore change during a flight. The harvester consists of an inductive coil with a ferrite core, which is interfaced to a rectifier, step-down regulator and supercapacitor. A prototype system was constructed to demonstrate reliable output voltage regulation across a supercapacitor that will supply a peak power of 100 mW under duty cycled load conditions. The system could fully charge a 40 mF supercapacitor to 3.3 V in 78 s from a power line current of 1.5 Arms at 650 Hz.

  9. Lifelines and Earthquake Hazards in the Interstate 5 Urban Corridor: Cottage Grove to Woodburn, Oregon

    USGS Publications Warehouse

    Barnett, E.A.; Weaver, C.S.; Meagher, K.L.; Wang, Z.; Madin, I.P.; Wang, M.; Haugerud, R.A.; Wells, R.E.; Ballantyne, D.B.; Darienzo, M.; Southern Willamette Valley Working Group

    2004-01-01

    The Interstate 5 highway corridor, stretching from Mexico to Canada, is not only the economic artery of the Pacific Northwest, but is also home to the majority of Oregonians and Washingtonians. Accordingly, most regional utility and transportation systems, such as railroads and electrical transmission lines, have major components in the I-5 corridor. The section of I-5 from Cottage Grove, Oregon, to Blaine, Washington, is rapidly urbanizing, with population growth and economic development centered around the cities of Eugene, Salem, Portland, Olympia, Tacoma, Seattle, Everett, and Bellingham. For the purposes of this map, we refer to this area as the I-5 Urban Corridor. This publicaton consists of two large sheets: A map and a text-and-figures poster.

  10. Predictive model of avian electrocution risk on overhead power lines.

    PubMed

    Dwyer, J F; Harness, R E; Donohue, K

    2014-02-01

    Electrocution on overhead power structures negatively affects avian populations in diverse ecosystems worldwide, contributes to the endangerment of raptor populations in Europe and Africa, and is a major driver of legal action against electric utilities in North America. We investigated factors associated with avian electrocutions so poles that are likely to electrocute a bird can be identified and retrofitted prior to causing avian mortality. We used historical data from southern California to identify patterns of avian electrocution by voltage, month, and year to identify species most often killed by electrocution in our study area and to develop a predictive model that compared poles where an avian electrocution was known to have occurred (electrocution poles) with poles where no known electrocution occurred (comparison poles). We chose variables that could be quantified by personnel with little training in ornithology or electric systems. Electrocutions were more common at distribution voltages (≤ 33 kV) and during breeding seasons and were more commonly reported after a retrofitting program began. Red-tailed Hawks (Buteo jamaicensis) (n = 265) and American Crows (Corvus brachyrhynchos) (n = 258) were the most commonly electrocuted species. In the predictive model, 4 of 14 candidate variables were required to distinguish electrocution poles from comparison poles: number of jumpers (short wires connecting energized equipment), number of primary conductors, presence of grounding, and presence of unforested unpaved areas as the dominant nearby land cover. When tested against a sample of poles not used to build the model, our model distributed poles relatively normally across electrocution-risk values and identified the average risk as higher for electrocution poles relative to comparison poles. Our model can be used to reduce avian electrocutions through proactive identification and targeting of high-risk poles for retrofitting. PMID:24033371

  11. Transmission line design for a power distribution system at 20 kHz for aircraft

    NASA Technical Reports Server (NTRS)

    Zelby, L. W.; Mathes, J. B.; Shawver, J. W.

    1986-01-01

    A low inductance, low characteristic impedance transmission line was designed for a 20 kHz power distribution system. Several different conductor configurations were considered: strip lines, interdigitated metal ribbons, and standard insulated wires in multiwire configurations (circular and rectangular cylindrical arrangements). The final design was a rectangular arrangement of multiple wires of the same gauge with alternating polarities from wire to wire. This offered the lowest inductance per unit length (on the order of several nanohenries/meter) and the lowest characteristic impedance (on the order of one Ohm). Standard multipin connectors with gold-plated elements were recommended with this transmission line, the junction boxes to be internally connected with flat metal ribbons for low inductance, and the line to be constructed in sections of suitable length. Computer programs for the calculation of inductance of multiwire lines and of capacitances of strip lines were developed.

  12. Final report: Prototyping a combustion corridor

    SciTech Connect

    Rutland, Christopher J.; Leach, Joshua

    2001-12-15

    The Combustion Corridor is a concept in which researchers in combustion and thermal sciences have unimpeded access to large volumes of remote computational results. This will enable remote, collaborative analysis and visualization of state-of-the-art combustion science results. The Engine Research Center (ERC) at the University of Wisconsin - Madison partnered with Lawrence Berkeley National Laboratory, Argonne National Laboratory, Sandia National Laboratory, and several other universities to build and test the first stages of a combustion corridor. The ERC served two important functions in this partnership. First, we work extensively with combustion simulations so we were able to provide real world research data sets for testing the Corridor concepts. Second, the ERC was part of an extension of the high bandwidth based DOE National Laboratory connections to universities.

  13. Increased deposition of polychlorinated biphenyls (PCBs) under an AC high-voltage power line

    NASA Astrophysics Data System (ADS)

    Öberg, Tomas; Peltola, Pasi

    2009-12-01

    There is considerable public concern regarding the potential risks to health of electromagnetic fields in general and high-voltage power lines in particular. As epidemiological findings are not supported by a clearly defined mechanism of direct magnetic field interactions with the human body, potential indirect effects are of interest. It has been suggested that an increased exposure to chemical pollutants could occur near high-voltage power lines due to formation and deposition of charged aerosols. The current study reports empirical evidence that seems to support this hypothesis. The deposition of 18 congeners of polychlorinated biphenyls (PCBs) was studied by collecting samples of pine needles under a 400 kV AC power line and at reference sites in the vicinity. Compared to the reference sites, the average deposition of PCB congeners under the power line was almost double. This difference between the two groups of samples was statistically significant. While it is premature to draw any conclusions regarding the human exposure near high-voltage power lines, the issue deserves attention and further investigations.

  14. A Measurement and Power Line Communication System Design for Renewable Smart Grids

    NASA Astrophysics Data System (ADS)

    Kabalci, E.; Kabalci, Y.

    2013-10-01

    The data communication over the electric power lines can be managed easily and economically since the grid connections are already spread around all over the world. This paper investigates the applicability of Power Line Communication (PLC) in an energy generation system that is based on photovoltaic (PV) panels with the modeling study in Matlab/Simulink. The Simulink model covers the designed PV panels, boost converter with Perturb and Observe (P&O) control algorithm, full bridge inverter, and the binary phase shift keying (BPSK) modem that is utilized to transfer the measured data over the power lines. This study proposes a novel method to use the electrical power lines not only for carrying the line voltage but also to transmit the measurements of the renewable energy generation plants. Hence, it is aimed at minimizing the additional monitoring costs such as SCADA, Ethernet-based or GSM based systems by using the proposed technique. Although this study is performed with solar power plants, the proposed model can be applied to other renewable generation systems. Consequently, the usage of the proposed technique instead of SCADA or Ethernet-based systems eliminates additional monitoring costs.

  15. Research of on-line monitoring method for insulation condition of power transformer bushing

    NASA Astrophysics Data System (ADS)

    Xia, Jiuyun; Qian, Zheng; Yu, Hao; Yao, Junda

    2016-01-01

    The power transformer is the key equipment of the power system; its insulation condition will directly influence the security and reliability of the power system. Thus, the on-line monitoring of power transformer is urgently required in order to guarantee the normal operation of the power system. Moreover, the dielectric loss factor is a significant parameter reflecting the condition of transformer bushing, so the on-line measurement of dielectric loss factor is really important. In this paper, the phase-to-phase comparison method is selected as the on-line monitoring method based on the overall analysis and discussion of the existing on-line monitoring methods. At first, the harmonic analysis method is utilized to calculate the dielectric loss of each phase of the three-phase transformer bushing, and then the differences of dielectric loss between every two phases are calculated and analyzed. So the insulation condition of each bushing could be achieved based on the careful analysis of different phase-to-phase dielectric loss. The simulation results of phase-to-phase comparison method are carried out in this paper, and the validity is verified. At last, this method is utilized in an actual equipment of on-line monitoring.

  16. Childhood cancer and exposure to corona ions from power lines: an epidemiological test.

    PubMed

    Swanson, J; Bunch, K J; Vincent, T J; Murphy, M F G

    2014-12-01

    We previously reported an association between childhood leukaemia in Britain and proximity of the child's address at birth to high-voltage power lines that declines from the 1960s to the 2000s. We test here whether a 'corona-ion hypothesis' could explain these results. This hypothesis proposes that corona ions, atmospheric ions produced by power lines and blown away from them by the wind, increase the retention of airborne pollutants in the airways when breathed in and hence cause disease. We develop an improved model for calculating exposure to corona ions, using data on winds from meteorological stations and considering the whole length of power line within 600 m of each subject's address. Corona-ion exposure is highly correlated with proximity to power lines, and hence the results parallel the elevations in leukaemia risk seen with distance analyses. But our model explains the observed pattern of leukaemia rates around power lines less well than straightforward distance measurements, and ecological considerations also argue against the hypothesis. This does not disprove the corona-ion hypothesis as the explanation for our previous results, but nor does it provide support for it, or, by extension, any other hypothesis dependent on wind direction. PMID:25356811

  17. 76 FR 3695 - Environmental Impact Statement: Interstate 64 Corridor, Virginia

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... Federal Highway Administration Environmental Impact Statement: Interstate 64 Corridor, Virginia AGENCY... Statement (EIS) in cooperation with the Virginia Department of Transportation for potential transportation improvements along the Interstate 64 corridor in Virginia. FOR FURTHER INFORMATION CONTACT: John...

  18. 43 CFR 2802.11 - How does BLM designate corridors?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... activities located within the proposed right-of-way corridor; (7) Social and economic impacts of the right-of...) Transportation and utility corridor studies previously developed by user groups; and (9) Engineering...

  19. 43 CFR 2802.11 - How does BLM designate corridors?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... activities located within the proposed right-of-way corridor; (7) Social and economic impacts of the right-of...) Transportation and utility corridor studies previously developed by user groups; and (9) Engineering...

  20. 43 CFR 2802.11 - How does BLM designate corridors?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... activities located within the proposed right-of-way corridor; (7) Social and economic impacts of the right-of...) Transportation and utility corridor studies previously developed by user groups; and (9) Engineering...

  1. 76 FR 65561 - Multistate Corridor Operations and Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-21

    ... corridor transportation activities and research to apply for participation in the Multistate Corridor... Transportation Equity Act: A Legacy for Users (SAFETEA-LU) Intelligent Transportation Systems (ITS) Research... implementation for research programs and projects to improve multimodal transportation system management...

  2. 45 CFR 153.540 - Compliance with risk corridors standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CARE ACCESS STANDARDS RELATED TO REINSURANCE, RISK CORRIDORS, AND RISK ADJUSTMENT UNDER THE AFFORDABLE CARE ACT Health Insurance Issuer Standards Related to the Risk Corridors Program § 153.540...

  3. Interior, looking corridor connecting 511 to 515 into Medical Research ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior, looking corridor connecting 511 to 515 into Medical Research Library in 516. - Fitzsimons General Hospital, Central Service Building, North of Building No. 511, East of corridor connecting Building 511 to Building 515, Aurora, Adams County, CO

  4. Electric Power Lines : Questions and Answers on Research into Health Effects.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-06-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the EMF (electric and magnetic fields) produced by power lines and other electrical devices affect our health. Although no adverse health effects of electric power EMF have been confirmed, there is continued scientific uncertainty about this issue. Research on EMF is ongoing throughout the world. The purpose of this booklet is to answer some common questions that the BPA (Bonneville Power Administration) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

  5. California air transportation study: A transportation system for the California Corridor of the year 2010

    NASA Technical Reports Server (NTRS)

    1989-01-01

    To define and solve the problems of transportation in the California Corrider in the year 2010, the 1989 California Polytechnic State University Aeronautical Engineering Senior Design class determined future corridor transportation needs and developed a system to meet the requirements. A market study, which included interpreting travel demand and gauging the future of regional and national air travel in and out of the corridor, allowed the goals of the project to be accurately refined. Comprehensive trade-off studies of several proposed transporation systems were conducted to determine which components would form the final proposed system. Preliminary design and further analysis were performed for each resulting component. The proposed system consists of three vehicles and a special hub or mode mixer, the Corridor Access Port (CAP). The vehicles are: (1) an electric powered aircraft to serve secondary airports and the CAP; (2) a high speed magnetic levitation train running through the CAP and the high population density areas of the corridor; and (3) a vertical takeoff and landing tilt rotor aircraft to serve both intercity and intrametropolitan travelers from the CAP and city vertiports. The CAP is a combination and an extension of the hub, mode mixer, and Wayport concepts. The CAP is an integrated part of the system which meets the travel demands in the corridor, and interfaces with interstate and international travel.

  6. On-line Adaptive and Intelligent Distance Relaying Scheme for Power Network

    NASA Astrophysics Data System (ADS)

    Dubey, Rahul; Samantaray, S. R.; Panigrahi, B. K.; Venkoparao, G. V.

    2015-10-01

    The paper presents an on-line sequential extreme learning machine (OS-ELM) based fast and accurate adaptive distance relaying scheme (ADRS) for transmission line protection. The proposed method develops an adaptive relay characteristics suitable to the changes in the physical conditions of the power systems. This can efficiently update the trained model on-line by partial training on the new data to reduce the model updating time whenever a new special case occurs. The effectiveness of the proposed method is validated on simulation platform for test system with two terminal parallel transmission lines with complex mutual coupling. The test results, considering wide variations in operating conditions of the faulted power network, indicate that the proposed adaptive relay setting provides significant improvement in the relay performance.

  7. Nonlinear femtosecond pump-probe spectroscopy using a power-encoded soliton delay line.

    PubMed

    Saint-Jalm, Sarah; Andresen, Esben Ravn; Bendahmane, Abdelkrim; Kudlinski, Alexandre; Rigneault, Hervé

    2016-01-01

    We show femtosecond time-resolved nonlinear pump-probe spectroscopy using a fiber soliton as the probe pulse. Furthermore, we exploit soliton dynamics to record an entire transient trace with a power-encoded delay sweep. The power-encoded delay line takes advantage of the dependency of the soliton trajectory in the (λ,z) space upon input power; the difference in accumulated group delay between trajectories converts a fast power sweep into a fast delay sweep. We demonstrate the concept by performing transient absorption spectroscopy in a test sample and validate it against a conventional pump-probe setup. PMID:26696172

  8. Visual based navigation for power line inspection by using virtual environments

    NASA Astrophysics Data System (ADS)

    Cerón, Alexander; Mondragón, Iván. F.; Prieto, Flavio

    2015-01-01

    Power line inspection is an important task for the maintenance of electrical infrastructure. UAVs (Unmanned aerial vehicle) can be very useful in the inspection process because the high costs of obtaining images of power lines from different perspectives and the logistic problems of manned flights. The use of the power line as a reference for navigation can be difficult because the different backgrounds, we consider the use of the tower as a reference in order to improve the orientation of the UAV respect to the electrical grid. In this work we generate a process for navigation based in tower detection. The navigation is performed by using the information extracted from a frontal camera in a visual control scheme and validated in virtual environments.

  9. High-Power Ka-Band Transmission Line with a Frequency Bandwidth of 1 GHZ

    NASA Astrophysics Data System (ADS)

    Bogdashov, A. A.; Denisov, G. G.; Samsonov, S. V.; Gachev, I. G.; Dominyuk, Ya. V.; Murzin, V. N.; Levitan, B. A.

    2016-03-01

    We present experimental results on a high-power transmission line from the broadband pulsed Ka-band gyro-TWT to the phased antenna array. The transmission line is designed to operate in a pulse-periodic regime with a pulse width of up to 250 μs, a duty factor of 8, and an average output power of up to 15 kW. Amplitude-frequency and phase-frequency characteristics of the transmission line were measured at a low power level. It is shown that the nonlinearity of the phase-frequency characteristic does not exceed ±10° in the 34 ± 0.5 GHz frequency band.

  10. System for transmitting low frequency analog signals over AC power lines

    DOEpatents

    Baker, Steven P.; Durall, Robert L.; Haynes, Howard D.

    1989-09-05

    A system for transmitting low frequency analog signals over AC power lines using FM modulation. A low frequency analog signal to be transmitted is first applied to a voltage-to-frequency converter where it is converted to a signal whose frequency varies in proportion to the analog signal amplitude. This signal is then used to modulate the carrier frequency of an FM transmitter coupled to an AC power line. The modulation signal frequency range in selected to be within the response band of the FM transmitter. The FM modulated carrier signal is received by an FM receiver coupled to the AC power line, demodulated and the demodulated signal frequency is converted by a frequency-to-voltage converter back to the form of the original low frequency analog input signal.

  11. A system for tranmitting low frequency analog signals over ac power lines

    DOEpatents

    Baker, S.P.; Durall, R.L.; Haynes, H.D.

    1987-07-30

    A system for transmitting low frequency analog signals over ac power lines using FM modulation. A low frequency analog signal to be transmitted is first applied to a voltage-to-frequency converter where it is converted to a signal whose frequency varies in proportion to the analog signal amplitude. This signal is then used to modulate the carrier frequency of an FM transmitter coupled to an ac power line. The modulation signal frequency range is selected to be within the response band of the FM transmitter. The FM modulated carrier signal is received by an FM receiver coupled to the ac power line, demodulated and the demodulated signal frequency is converted by a frequency-to-voltage converter back to the form of the original low frequency analog input signal. 4 figs.

  12. System for transmitting low frequency analog signals over AC power lines

    DOEpatents

    Baker, Steven P.; Durall, Robert L.; Haynes, Howard D.

    1989-01-01

    A system for transmitting low frequency analog signals over AC power lines using FM modulation. A low frequency analog signal to be transmitted is first applied to a voltage-to-frequency converter where it is converted to a signal whose frequency varies in proportion to the analog signal amplitude. This signal is then used to modulate the carrier frequency of an FM transmitter coupled to an AC power line. The modulation signal frequency range in selected to be within the response band of the FM transmitter. The FM modulated carrier signal is received by an FM receiver coupled to the AC power line, demodulated and the demodulated signal frequency is converted by a frequency-to-voltage converter back to the form of the original low frequency analog input signal.

  13. 46 CFR 190.10-30 - Dead end corridors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Dead end corridors. 190.10-30 Section 190.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 190.10-30 Dead end corridors. (a) Dead end corridors, or the equivalent,...

  14. 46 CFR 92.10-30 - Dead end corridors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Dead end corridors. 92.10-30 Section 92.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 92.10-30 Dead end corridors. (a) Dead end corridors, or...

  15. 46 CFR 190.10-30 - Dead end corridors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Dead end corridors. 190.10-30 Section 190.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 190.10-30 Dead end corridors. (a) Dead end corridors, or the equivalent,...

  16. 46 CFR 92.10-30 - Dead end corridors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Dead end corridors. 92.10-30 Section 92.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 92.10-30 Dead end corridors. (a) Dead end corridors, or...

  17. 46 CFR 92.10-30 - Dead end corridors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Dead end corridors. 92.10-30 Section 92.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 92.10-30 Dead end corridors. (a) Dead end corridors, or...

  18. 46 CFR 72.10-30 - Dead end corridors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 3 2011-10-01 2011-10-01 false Dead end corridors. 72.10-30 Section 72.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 72.10-30 Dead end corridors. (a) Dead end corridors, or the equivalent, more than...

  19. 46 CFR 92.10-30 - Dead end corridors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Dead end corridors. 92.10-30 Section 92.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 92.10-30 Dead end corridors. (a) Dead end corridors, or...

  20. 46 CFR 72.10-30 - Dead end corridors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 3 2013-10-01 2013-10-01 false Dead end corridors. 72.10-30 Section 72.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 72.10-30 Dead end corridors. (a) Dead end corridors, or the equivalent, more than...

  1. 46 CFR 190.10-30 - Dead end corridors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Dead end corridors. 190.10-30 Section 190.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 190.10-30 Dead end corridors. (a) Dead end corridors, or the equivalent,...

  2. 46 CFR 72.10-30 - Dead end corridors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 3 2012-10-01 2012-10-01 false Dead end corridors. 72.10-30 Section 72.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 72.10-30 Dead end corridors. (a) Dead end corridors, or the equivalent, more than...

  3. 46 CFR 190.10-30 - Dead end corridors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Dead end corridors. 190.10-30 Section 190.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 190.10-30 Dead end corridors. (a) Dead end corridors, or the equivalent,...

  4. 46 CFR 190.10-30 - Dead end corridors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Dead end corridors. 190.10-30 Section 190.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 190.10-30 Dead end corridors. (a) Dead end corridors, or the equivalent,...

  5. 46 CFR 92.10-30 - Dead end corridors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Dead end corridors. 92.10-30 Section 92.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 92.10-30 Dead end corridors. (a) Dead end corridors, or...

  6. 46 CFR 72.10-30 - Dead end corridors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Dead end corridors. 72.10-30 Section 72.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 72.10-30 Dead end corridors. (a) Dead end corridors, or the equivalent, more than...

  7. 46 CFR 72.10-30 - Dead end corridors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 3 2014-10-01 2014-10-01 false Dead end corridors. 72.10-30 Section 72.10-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 72.10-30 Dead end corridors. (a) Dead end corridors, or the equivalent, more than...

  8. 45 CFR 153.530 - Risk corridors data requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Risk corridors data requirements. 153.530 Section... ACCESS STANDARDS RELATED TO REINSURANCE, RISK CORRIDORS, AND RISK ADJUSTMENT UNDER THE AFFORDABLE CARE ACT Health Insurance Issuer Standards Related to the Risk Corridors Program § 153.530 Risk...

  9. 45 CFR 153.530 - Risk corridors data requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Risk corridors data requirements. 153.530 Section... ACCESS STANDARDS RELATED TO REINSURANCE, RISK CORRIDORS, AND RISK ADJUSTMENT UNDER THE AFFORDABLE CARE ACT Health Insurance Issuer Standards Related to the Risk Corridors Program § 153.530 Risk...

  10. Refining Estimates of Bird Collision and Electrocution Mortality at Power Lines in the United States

    PubMed Central

    Loss, Scott R.; Will, Tom; Marra, Peter P.

    2014-01-01

    Collisions and electrocutions at power lines are thought to kill large numbers of birds in the United States annually. However, existing estimates of mortality are either speculative (for electrocution) or based on extrapolation of results from one study to all U.S. power lines (for collision). Because national-scale estimates of mortality and comparisons among threats are likely to be used for prioritizing policy and management strategies and for identifying major research needs, these estimates should be based on systematic and transparent assessment of rigorously collected data. We conducted a quantitative review that incorporated data from 14 studies meeting our inclusion criteria to estimate that between 12 and 64 million birds are killed each year at U.S. power lines, with between 8 and 57 million birds killed by collision and between 0.9 and 11.6 million birds killed by electrocution. Sensitivity analyses indicate that the majority of uncertainty in our estimates arises from variation in mortality rates across studies; this variation is due in part to the small sample of rigorously conducted studies that can be used to estimate mortality. Little information is available to quantify species-specific vulnerability to mortality at power lines; the available literature over-represents particular bird groups and habitats, and most studies only sample and present data for one or a few species. Furthermore, additional research is needed to clarify whether, to what degree, and in what regions populations of different bird species are affected by power line-related mortality. Nonetheless, our data-driven analysis suggests that the amount of bird mortality at U.S. power lines is substantial and that conservation management and policy is necessary to reduce this mortality. PMID:24991997

  11. On the application of a machine learning technique to fault diagnosis of power distribution lines

    SciTech Connect

    Togami, Masato; Abe, Norihiro; Kitahashi, T.; Ogawa, Harunao

    1995-10-01

    This paper presents one method for fault diagnosis of power distribution lines by using a decision tree. The conventional method, using a decision tree, applies only to discrete attribute values. To apply it to fault diagnosis of power distribution lines, in practice it must be revised in order to treat attributes whose values range over certain widths. This is because the sensor value or attribute value varies owing to the resistance of the fault point or is influenced by noise. The proposed method is useful when the attribute value has such a property, and it takes into consideration the cost of acquiring the information and the probability of the occurrence of a fault.

  12. Theory and simulation of high-power microwave generation in a magnetically insulated transmission line oscillator

    NASA Astrophysics Data System (ADS)

    Lemke, Raymond W.; Clark, Collins M.

    1987-10-01

    The magnetically insulated transmission line (MITE-LINE) oscillator is an electron beam diode comprised of a field emitting cathode and a corrugated anode. The device is similar to a linear magnetron except that the insulating magnetic field is self-generated. The self-insulating property makes this device a robust high-power microwave tube. Using the thin-beam approximation a dispersion relation for a cylindrical MITE-LINE oscillator is derived. The dispersion relation is used to predict frequency and growth rate of the microwave generating instability. Analytical results are compared with CCUBE particle simulations.

  13. Theory and simulation of high-power microwave generation in a magnetically insulated transmission line oscillator

    SciTech Connect

    Lemke, R.W.; Collins Clark, M.

    1987-10-15

    The magnetically insulated transmission line (MITE-LINE) oscillator is an electron beam diode comprised of a field emitting cathode and a corrugated anode. The device is similar to a linear magnetron except that the insulating magnetic field is self-generated. The self-insulating property makes this device a robust high-power microwave tube. Using the thin-beam approximation we have derived a dispersion relation for a cylindrical MITE-LINE oscillator. The dispersion relation is used to predict frequency and growth rate of the microwave generating instability. Analytical results are compared with c-smcapsc-smcapsu-smcapsb-smcapse-smcaps particle simulations.

  14. Comparison of charged nanoparticle concentrations near busy roads and overhead high-voltage power lines.

    PubMed

    Jayaratne, E R; Ling, X; Morawska, L

    2015-09-01

    Overhead high-voltage power lines are known sources of corona ions. These ions rapidly attach to aerosols to form charged particles in the environment. Although the effect of ions and charged particles on human health is largely unknown, much attention has focused on the increasing exposure as a result of the expanding power network in urban residential areas. However, it is not widely known that a large number of charged particles in urban environments originate from motor vehicle emissions. In this study, for the first time, we compare the concentrations of charged nanoparticles near busy roads and overhead power lines. We show that large concentrations of both positive and negative charged nanoparticles are present near busy roadways and that these concentrations commonly exceed those under high-voltage power lines. We estimate that the concentration of charged nanoparticles found near two freeways carrying around 120 vehicles per minute exceeded the corresponding maximum concentrations under two corona-emitting overhead power lines by as much as a factor of 5. The difference was most pronounced when a significant fraction of traffic consisted of heavy-duty diesel vehicles which typically have high particle and charge emission rates. PMID:25917858

  15. A compact high power pulsed modulator based on spiral Blumlein line.

    PubMed

    Liu, Jinliang; Yin, Yi; Ge, Bin; Cheng, Xinbing; Feng, Jiahuai; Zhang, Jiande; Wang, Xinxin

    2007-10-01

    A compact high power pulsed modulator based on spiral water Blumlein line, which consists of primary storage capacitors, a Tesla transformer, a spiral Blumlein line of water dielectric, and a field-emission diode, is described. The experimental results showed that the diode voltage is more than 500 kV, the electron beam current of diode is about 32 kA, and the pulse duration is about 180 ns. The distributions for electrical field in the spiral water Blumlein line were obtained by the simulations. In addition, the process of the charging a spiral Blumlein line was simulated through the PSPICE software to get the wave form of charging voltage of pulse forming line, the diode voltage, and diode current of modulator. The theoretical and simulated results are in agreement. This accelerator is very compact and works stably and reliably. PMID:17979411

  16. Observations of radiation from power lines in near-earth space

    NASA Astrophysics Data System (ADS)

    Korepanov, V. E.; Dudkin, F. L.; Pronenko, V. A.

    2015-09-01

    The possible effects of technogenic impacts on the ionosphere, with the continuing trend towards its sustainable growth, are unknown today. It is therefore very important and urgent task to conduct statistically valid research related to the study of variations of ionospheric parameters due to the influence of powerful technogenic factors, primarily due to a significant increase of the electromagnetic energy production. In this paper, we discuss new results of observations of electromagnetic fields in the ionosphere at the power lines main frequency of 50 (60) Hz and its harmonics onboard SICH-1M (2004) and CHIBIS-M (2012-2014) satellites. The spatial distribution of the observed phenomena and their connection with possible ground-based sources-powerful transmission lines is presented. It is concluded that organization of regular monitoring of technogenic fields may allow continuous control of energy consumption in both the local (within a country or even a powerful consumer) and global scales.

  17. Safety against lightning for linemen working on de-energized power lines

    SciTech Connect

    Mousa, A.M.; Srivastava, K.D.

    1986-01-01

    Where the risk of accidental power-frequency energization is concerned, the safety ground has a short-circuit discharge duty determined by the configuration and parameters of the power system. Safety is thus assured by selecting a safety ground having a short-circuit safety rating which matches the duty imposed by the power system. Up to now, a similar matching for lightning currents has not been possible. This paper addresses this problem by: 1. Determining the lightning current rating of typical safety grounds. 2. Calculating the lightning current discharge duty of safety grounds in terms of the insulatuon level of the line and the distance from the location of the thunderstorm. The analysis shows that special precautions are needed when working on power lines of voltage classes above 360 kV.

  18. The Effect Analysis of Strain Rate on Power Transmission Tower-Line System under Seismic Excitation

    PubMed Central

    Wang, Wenming

    2014-01-01

    The effect analysis of strain rate on power transmission tower-line system under seismic excitation is studied in this paper. A three-dimensional finite element model of a transmission tower-line system is created based on a real project. Using theoretical analysis and numerical simulation, incremental dynamic analysis of the power transmission tower-line system is conducted to investigate the effect of strain rate on the nonlinear responses of the transmission tower and line. The results show that the effect of strain rate on the transmission tower generally decreases the maximum top displacements, but it would increase the maximum base shear forces, and thus it is necessary to consider the effect of strain rate on the seismic analysis of the transmission tower. The effect of strain rate could be ignored for the seismic analysis of the conductors and ground lines, but the responses of the ground lines considering strain rate effect are larger than those of the conductors. The results could provide a reference for the seismic design of the transmission tower-line system. PMID:25105157

  19. The effect analysis of strain rate on power transmission tower-line system under seismic excitation.

    PubMed

    Tian, Li; Wang, Wenming; Qian, Hui

    2014-01-01

    The effect analysis of strain rate on power transmission tower-line system under seismic excitation is studied in this paper. A three-dimensional finite element model of a transmission tower-line system is created based on a real project. Using theoretical analysis and numerical simulation, incremental dynamic analysis of the power transmission tower-line system is conducted to investigate the effect of strain rate on the nonlinear responses of the transmission tower and line. The results show that the effect of strain rate on the transmission tower generally decreases the maximum top displacements, but it would increase the maximum base shear forces, and thus it is necessary to consider the effect of strain rate on the seismic analysis of the transmission tower. The effect of strain rate could be ignored for the seismic analysis of the conductors and ground lines, but the responses of the ground lines considering strain rate effect are larger than those of the conductors. The results could provide a reference for the seismic design of the transmission tower-line system. PMID:25105157

  20. Magnet power supply control of the NSLS VUV and x-ray storage rings transfer lines

    SciTech Connect

    Klein, J.D.; Ramamoorthy, S.; Singh, O.; Smith, J.D.

    1985-01-01

    The transfer lines for NSLS VUV and x-ray storage rings have been split. New power supplies have been incorporated with existing ones. The existing microprocessor system has been upgraded in order to control the additional functions. This system expands the input/output port of the microprocessor to an addressable serial/parallel link to each magnet power supply. The implementation of this system will be discussed.

  1. Bias-field controlled phasing and power combination of gyromagnetic nonlinear transmission lines

    SciTech Connect

    Reale, D. V. Bragg, J.-W. B.; Gonsalves, N. R.; Johnson, J. M.; Neuber, A. A.; Dickens, J. C.; Mankowski, J. J.

    2014-05-15

    Gyromagnetic Nonlinear Transmission Lines (NLTLs) generate microwaves through the damped gyromagnetic precession of the magnetic moments in ferrimagnetic material, and are thus utilized as compact, solid-state, frequency agile, high power microwave (HPM) sources. The output frequency of a NLTL can be adjusted by control of the externally applied bias field and incident voltage pulse without physical alteration to the structure of the device. This property provides a frequency tuning capability not seen in many conventional e-beam based HPM sources. The NLTLs developed and tested are mesoband sources capable of generating MW power levels in the L, S, and C bands of the microwave spectrum. For an individual NLTL the output power at a given frequency is determined by several factors including the intrinsic properties of the ferrimagnetic material and the transmission line structure. Hence, if higher power levels are to be achieved, it is necessary to combine the outputs of multiple NLTLs. This can be accomplished in free space using antennas or in a transmission line via a power combiner. Using a bias-field controlled delay, a transient, high voltage, coaxial, three port, power combiner was designed and tested. Experimental results are compared with the results of a transient COMSOL simulation to evaluate combiner performance.

  2. Bias-field controlled phasing and power combination of gyromagnetic nonlinear transmission lines.

    PubMed

    Reale, D V; Bragg, J-W B; Gonsalves, N R; Johnson, J M; Neuber, A A; Dickens, J C; Mankowski, J J

    2014-05-01

    Gyromagnetic Nonlinear Transmission Lines (NLTLs) generate microwaves through the damped gyromagnetic precession of the magnetic moments in ferrimagnetic material, and are thus utilized as compact, solid-state, frequency agile, high power microwave (HPM) sources. The output frequency of a NLTL can be adjusted by control of the externally applied bias field and incident voltage pulse without physical alteration to the structure of the device. This property provides a frequency tuning capability not seen in many conventional e-beam based HPM sources. The NLTLs developed and tested are mesoband sources capable of generating MW power levels in the L, S, and C bands of the microwave spectrum. For an individual NLTL the output power at a given frequency is determined by several factors including the intrinsic properties of the ferrimagnetic material and the transmission line structure. Hence, if higher power levels are to be achieved, it is necessary to combine the outputs of multiple NLTLs. This can be accomplished in free space using antennas or in a transmission line via a power combiner. Using a bias-field controlled delay, a transient, high voltage, coaxial, three port, power combiner was designed and tested. Experimental results are compared with the results of a transient COMSOL simulation to evaluate combiner performance. PMID:24880394

  3. Bias-field controlled phasing and power combination of gyromagnetic nonlinear transmission lines

    NASA Astrophysics Data System (ADS)

    Reale, D. V.; Bragg, J.-W. B.; Gonsalves, N. R.; Johnson, J. M.; Neuber, A. A.; Dickens, J. C.; Mankowski, J. J.

    2014-05-01

    Gyromagnetic Nonlinear Transmission Lines (NLTLs) generate microwaves through the damped gyromagnetic precession of the magnetic moments in ferrimagnetic material, and are thus utilized as compact, solid-state, frequency agile, high power microwave (HPM) sources. The output frequency of a NLTL can be adjusted by control of the externally applied bias field and incident voltage pulse without physical alteration to the structure of the device. This property provides a frequency tuning capability not seen in many conventional e-beam based HPM sources. The NLTLs developed and tested are mesoband sources capable of generating MW power levels in the L, S, and C bands of the microwave spectrum. For an individual NLTL the output power at a given frequency is determined by several factors including the intrinsic properties of the ferrimagnetic material and the transmission line structure. Hence, if higher power levels are to be achieved, it is necessary to combine the outputs of multiple NLTLs. This can be accomplished in free space using antennas or in a transmission line via a power combiner. Using a bias-field controlled delay, a transient, high voltage, coaxial, three port, power combiner was designed and tested. Experimental results are compared with the results of a transient COMSOL simulation to evaluate combiner performance.

  4. Reducing The Risk Of Abrupt Climate Change: Emission Corridors Preserving The Thermohaline Circulation

    NASA Astrophysics Data System (ADS)

    Zickfeld, K.

    Paleo-reconstructions have shown that large and abrupt climate changes have occurred throughout the last ice-age cycles. This evidence, supplemented by insights into the complex and nonlinear nature of the climate system, gives raise to the concern that anthropogenic forcing may trigger such events in the future. A prominent example for such a potential climatic shift is the collapse of the North Atlantic thermohaline circu- lation (THC), which would cause a major cooling of the northern North Atlantic and north-western Europe and considerable regional sea level rise, with possibly severe consequences on, e.g., fisheries, agriculture and ecosystems. In this paper we present emission corridors for the 21st century preserving the THC. Emission corridors embrace the range of future emissions beyond which either the THC collapses or the mitigation burden becomes intolerable. They are calculated along the conceptual and methodological lines of the tolerable windows approach. We investigate the sensitivity of the emission corridors to the main uncertain parame- ters (climate and North Atlantic hydrological sensitivities as well as emissions of non CO_2 greenhouse gases). Results show a high dependence of the size of the emis- sion corridors on hydrological and climate sensitivities. For the best-guess values of both parameters we find that the emission corridors are wider than the range spanned by the SRES emissions scenarios. Thus, no immediate mitigation seems necessary in order to preserve the THC. For high but still realistic values of the sensitivities, however, even the low SRES emissions scenarios transgress the corridor boundaries. These findings imply that under 'business as usual' a non-negligible risk of either a THC collapse or an intolerable mitigation burden exists.

  5. Corridors Increase Plant Species Richness at Large Scales

    SciTech Connect

    Damschen, Ellen I.; Haddad, Nick M.; Orrock,John L.; Tewksbury, Joshua J.; Levey, Douglas J.

    2006-09-01

    Habitat fragmentation is one of the largest threats to biodiversity. Landscape corridors, which are hypothesized to reduce the negative consequences of fragmentation, have become common features of ecological management plans worldwide. Despite their popularity, there is little evidence documenting the effectiveness of corridors in preserving biodiversity at large scales. Using a large-scale replicated experiment, we showed that habitat patches connected by corridors retain more native plant species than do isolated patches, that this difference increases over time, and that corridors do not promote invasion by exotic species. Our results support the use of corridors in biodiversity conservation.

  6. Remote sensing impact on corridor selection and placement

    NASA Technical Reports Server (NTRS)

    Thomson, F. J.; Sellman, A. N.

    1975-01-01

    Computer-aided corridor selection techniques, utilizing digitized data bases of socio-economic, census, and cadastral data, and developed for highway corridor routing are considered. Land resource data generated from various remote sensing data sources were successfully merged with the ancillary data files of a corridor selection model and prototype highway corridors were designed using the combined data set. Remote sensing derived information considered useful for highway corridor location, special considerations in geometric correction of remote sensing data to facilitate merging it with ancillary data files, and special interface requirements are briefly discussed.

  7. 29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926.1408 Section 1926.1408 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes...

  8. 29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926.1408 Section 1926.1408 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes...

  9. 29 CFR 1926.1409 - Power line safety (over 350 kV).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Power line safety (over 350 kV). 1926.1409 Section 1926.1409 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks...

  10. 29 CFR 1926.1409 - Power line safety (over 350 kV).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Power line safety (over 350 kV). 1926.1409 Section 1926.1409 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks...

  11. 30 CFR 56.12071 - Movement or operation of equipment near high-voltage power lines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Movement or operation of equipment near high... NONMETAL MINES Electricity § 56.12071 Movement or operation of equipment near high-voltage power lines. When equipment must be moved or operated near energized high-voltage powerlines (other than...

  12. 30 CFR 56.12071 - Movement or operation of equipment near high-voltage power lines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Movement or operation of equipment near high... NONMETAL MINES Electricity § 56.12071 Movement or operation of equipment near high-voltage power lines. When equipment must be moved or operated near energized high-voltage powerlines (other than...

  13. 30 CFR 56.12071 - Movement or operation of equipment near high-voltage power lines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Movement or operation of equipment near high... NONMETAL MINES Electricity § 56.12071 Movement or operation of equipment near high-voltage power lines. When equipment must be moved or operated near energized high-voltage powerlines (other than...

  14. Power Line Technician. Second Edition. Module E. Instructor's Manual [and] Student Workbook.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This module is the fifth in a series that is designed to help students achieve greater professional and personal success as power line technicians. Each module represents one or more complete units of instruction with components organized into one instructor and one student "package": the instructor's manual and the student workbook. The…

  15. Power Line Technician. Second Edition. Module B. Instructor's Manual [and] Student Workbook.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This module is the second in a series that is designed to help students achieve greater professional and personal success as power line technicians. Each module represents one or more complete units of instruction with components organized into one instructor and one student "package": the instructor's manual and the student workbook. The…

  16. Power Line Technician. Second Edition. Module G. Instructor's Manual [and] Student Workbook.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This module is the seventh in a series that is designed to help students achieve greater professional and personal success as power line technicians. Each module represents one or more complete units of instruction with components organized into one instructor and one student "package": the instructor's manual and the student workbook. The…

  17. Power Line Technician. Second Edition. Module F. Instructor's Manual [and] Student Workbook.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This module is the sixth in a series that is designed to help students achieve greater professional and personal success as power line technicians. Each module represents one or more complete units of instruction with components organized into one instructor and one student "package": the instructor's manual and the student workbook. The…

  18. Evaluation of line focus solar central power systems. Volume II. Systems evaluation

    SciTech Connect

    Not Available

    1980-03-15

    An evaluation was completed to ascertain the applicability of line focus technologies to electrical power applications and to compare their performance and cost potential with point focus central receiver power systems. It was concluded that although the high temperature line focus (SRI) and fixed mirror line focus (GA) concepts duplicate the heat source characteristics and power conversion technology of the central receiver concepts these configurations do not offer a sufficient improvement in cost to warrant full scale development. The systems are, however, less complex than their point focus counterpart and should the central receiver system development falter they provide reasonable technology alternatives. The parabolic trough concept (BDM) was found to provide a low temperature technology alternative to the central receiver concept with promising performance and cost potential. Its continued development is recommended, with special emphasis on lower temperature (< 700/sup 0/F) applications. Finally, a variety of new promising line focus power system configurations were identified for a range of utility and industrial applications and recommendations were made on their implementation. This volume contains the detailed report. (WHK)

  19. HHFW Power Flow Along Magnetic Field Lines In The Scrape-off Layer of NSTX

    SciTech Connect

    Rory Perkins, et. al.

    2012-02-27

    A significant fraction of high-harmonic fast-wave (HHFW) power applied to NSTX can be lost to the scrape-off layer (SOL) and deposited in bright and hot spirals on the divertor rather than in the core plasma. We show that the HHFW power flows to these spirals along magnetic field lines passing through the SOL in front of the antenna, implying that the HHFW power couples across the entire width of the SOL rather than mostly at the antenna face. This result will help guide future efforts to understand and minimize these edge losses in order to maximize fast wave heating and current drive.

  20. Development of traveling wave resonator based test bed for high power transmission line component testing

    NASA Astrophysics Data System (ADS)

    Jha, Akhil; Harikrishna, JVS; Ajesh, P.; Anand, Rohit; Trivedi, Rajesh; Mukherjee, Aparajita

    2015-12-01

    India is responsible for delivery of 8+1(prototype) RF sources to ITER Organization. Each RF source will provide 2.5MW of RF power at 2 VSWR in the frequency range of 35 to 65MHz. Eight such RF sources will generate total 20MW of RF power. A large number of high power transmission line components are required for connecting various stages of RF source. To test these passive transmission line components at high power, prior to connecting with RF source system, a test facility is required. India is developing a 3MW test facility based on the concept of Traveling Wave Resonator (TWR) for testing of transmission line components. TWR is basically a ring resonator which will build high power under certain operation condition at resonant frequency (˜55MHz in this case). In TWR, power is fed to the ring via a directional coupler continuously which leads to development of high circulating power in the ring. The voltage and current magnitude inside the ring increases with the increasing circulating power. Detailed RF simulation and design of the TWR test bed has been done using high frequency simulator Microwave Studio (MWS). Calculations done for the ring gain, transmission loss, resonance frequency etc. and are verified with the simulation results. Concept validated using 3-1/8 inch prototype TWR test bed, where experiments were carried out with a ˜10dB (λ/4 coupled) coupler to feed the ring. Ring gain of ˜13.24dB (˜21times) was achieved with ˜0.17 dB of ring loss. Around 9.2 kW ring power is achieved with an input power of 440W. At present, the 3-1/8inch TWR test bed is being upgraded with a ˜15dB coupler to achieve ring gain ˜19-20dB (˜80-100 times). This concept will be finally adopted for 12inch TWR test bed to achieve 3MW ring power with ˜30-40kW of input power. In this paper, detailed design, simulation, test results out of prototype activity and future plan for establishing MW level transmission line test bed is described.

  1. Improvements of high-power diode laser line generators open up new application fields

    NASA Astrophysics Data System (ADS)

    Meinschien, J.; Bayer, A.; Bruns, P.; Aschke, L.; Lissotschenko, V. N.

    2009-02-01

    Beam shaping improvements of line generators based on high power diode lasers lead to new application fields as hardening, annealing or cutting of various materials. Of special interest is the laser treatment of silicon. An overview of the wide variety of applications is presented with special emphasis of the relevance of unique laser beam parameters like power density and beam uniformity. Complementary to vision application and plastic processing, these new application markets become more and more important and can now be addressed by high power diode laser line generators. Herewith, a family of high power diode laser line generators is presented that covers this wide spectrum of application fields with very different requirements, including new applications as cutting of silicon or glass, as well as the beam shaping concepts behind it. A laser that generates a 5m long and 4mm wide homogeneous laser line is shown with peak intensities of 0.2W/cm2 for inspection of railway catenaries as well as a laser that generates a homogeneous intensity distribution of 60mm x 2mm size with peak intensities of 225W/cm2 for plastic processing. For the annealing of silicon surfaces, a laser was designed that generates an extraordinary uniform intensity distribution with residual inhomogeneities (contrast ratio) of less than 3% over a line length of 11mm and peak intensities of up to 75kW/cm2. Ultimately, a laser line is shown with a peak intensity of 250kW/cm2 used for cutting applications. Results of various application tests performed with the above mentioned lasers are discussed, particularly the surface treatment of silicon and the cutting of glass.

  2. Investigation of potential islanding problems of a line-commutated static power converter in photovoltaic systems

    SciTech Connect

    Sims, T.R.; Jones, R.A. . Research and Development Dept.); Imece, A.F. )

    1990-09-01

    Islanding is one of the major concerns that electric power utilities have about the impact of distributed photovoltaic (PV) generation. Islanding is the isolated operation of PV systems after the interruption of utility power. This paper reports the results of a research project on the possible islanding operation of a section of a distribution feeder containing line-commutated static power converters. The approach of the project was to develop a computer model of the SPC to predict islanding operation and verify the model with laboratory and field tests. The computer model accurately predicted the operation of the SPC during islanding. Furthermore, the effect of general system parameters on the islanding performance of the Gemini line-commutated SPC are presented.

  3. Voltages induced on a power distribution line by overhead cloud lightning

    NASA Technical Reports Server (NTRS)

    Yacoub, Ziad; Rubinstein, Marcos; Uman, Martin A.; Thomson, Ewen M.; Medelius, Pedro J.

    1991-01-01

    Voltages induced by overhead cloud lightning on a 448 m open circuited power distribution line and the corresponding north-south component of the lightning magnetic field were simultaneously measured at the NASA Kennedy Space Center during the summer of 1986. The incident electric field was calculated from the measured magnetic field. The electric field was then used as an input to the computer program, EMPLIN, that calculated the voltages at the two ends of the power line. EMPLIN models the frequency domain field/power coupling theory found, for example, in Ianoz et al. The direction of the source, which is also one of the inputs to EMPLIN, was crudely determined from a three station time delay technique. The authors found reasonably good agreement between calculated and measured waveforms.

  4. Design and testing of piezoelectric energy harvester for powering wireless sensors of electric line monitoring system

    NASA Astrophysics Data System (ADS)

    Qiu, Jing; Wen, Yumei; Li, Ping; Yang, Jin

    2012-04-01

    Scavenging electromagnetic and vibration energy from environments is an attractive technique for powering wireless sensors in a wireless sensor network. This paper reports our design and testing results on the electric output performance of a piezoelectric energy harvesting device, which consists of cantilever beams, magnetoelectric (ME) transducers, and permanent magnets. The geometric parameters of the device are based on an optimization design with a targeted resonant frequency of 50 Hz. Experimental results show that an output voltage of 56.1 V and an average power of 0.24 mW are achieved responding to a current of 3 A at 50 Hz. Remarkably, this power is a very encouraging power figure that gives the prospect of being able to power a wide range of wireless sensors in an electric line monitoring system.

  5. Extensive Sampling of Forest Carbon using High Density Power Line Lidar

    NASA Astrophysics Data System (ADS)

    Hampton, H. M.; Chen, Q.; Dye, D. G.; Hungate, B. A.

    2013-12-01

    unmanaged areas, using high point density lidar collected over transmission line corridors. The lidar metric of quadratic mean height guided our selection of field plots spanning the full range from low to high levels of aboveground biomass across the study region. Before model selection, we minimized two of the major sources of errors in lidar calibration: variance in tree allometry across landscapes and plot edge effects (spatial mismatch between field measurements and lidar points). We tested an assortment of model selection techniques and goodness of fit measures for deriving forest structural metrics of interest. For example, we obtained an R-squared value for aboveground biomass (Mg/ha) of 0.9 using stepwise regression. The forest metrics obtained are being used in the next stage of the project to parameterize biogeochemical models linking terrestrial carbon pools and atmospheric greenhouse gas exchanges.

  6. Transmission Line Security Monitor: Final Report

    SciTech Connect

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  7. INVESTIGATION OF A DYNAMIC POWER LINE RATING CONCEPT FOR IMPROVED WIND ENERGY INTEGRATION OVER COMPLEX TERRAIN

    SciTech Connect

    Jake P. Gentle; Kurt S Myers; Tyler B Phillips; Inanc Senocak; Phil Anderson

    2014-08-01

    Dynamic Line Rating (DLR) is a smart grid technology that allows the rating of power line to be based on real-time conductor temperature dependent on local weather conditions. In current practice overhead power lines are generally given a conservative rating based on worst case weather conditions. Using historical weather data collected over a test bed area, we demonstrate there is often additional transmission capacity not being utilized with the current static rating practice. We investigate a new dynamic line rating methodology using computational fluid dynamics (CFD) to determine wind conditions along transmission lines at dense intervals. Simulated results are used to determine conductor temperature by calculating the transient thermal response of the conductor under variable environmental conditions. In calculating the conductor temperature, we use both a calculation with steady-state assumption and a transient calculation. Under low wind conditions, steady-state assumption predicts higher conductor temperatures that could lead to curtailments, whereas transient calculations produce conductor temperatures that are significantly lower, implying the availability of additional transmission capacity.

  8. Multivariable time series prediction for the icing process on overhead power transmission line.

    PubMed

    Li, Peng; Zhao, Na; Zhou, Donghua; Cao, Min; Li, Jingjie; Shi, Xinling

    2014-01-01

    The design of monitoring and predictive alarm systems is necessary for successful overhead power transmission line icing. Given the characteristics of complexity, nonlinearity, and fitfulness in the line icing process, a model based on a multivariable time series is presented here to predict the icing load of a transmission line. In this model, the time effects of micrometeorology parameters for the icing process have been analyzed. The phase-space reconstruction theory and machine learning method were then applied to establish the prediction model, which fully utilized the history of multivariable time series data in local monitoring systems to represent the mapping relationship between icing load and micrometeorology factors. Relevant to the characteristic of fitfulness in line icing, the simulations were carried out during the same icing process or different process to test the model's prediction precision and robustness. According to the simulation results for the Tao-Luo-Xiong Transmission Line, this model demonstrates a good accuracy of prediction in different process, if the prediction length is less than two hours, and would be helpful for power grid departments when deciding to take action in advance to address potential icing disasters. PMID:25136653

  9. Multivariable Time Series Prediction for the Icing Process on Overhead Power Transmission Line

    PubMed Central

    Li, Peng; Zhao, Na; Zhou, Donghua; Cao, Min; Li, Jingjie; Shi, Xinling

    2014-01-01

    The design of monitoring and predictive alarm systems is necessary for successful overhead power transmission line icing. Given the characteristics of complexity, nonlinearity, and fitfulness in the line icing process, a model based on a multivariable time series is presented here to predict the icing load of a transmission line. In this model, the time effects of micrometeorology parameters for the icing process have been analyzed. The phase-space reconstruction theory and machine learning method were then applied to establish the prediction model, which fully utilized the history of multivariable time series data in local monitoring systems to represent the mapping relationship between icing load and micrometeorology factors. Relevant to the characteristic of fitfulness in line icing, the simulations were carried out during the same icing process or different process to test the model's prediction precision and robustness. According to the simulation results for the Tao-Luo-Xiong Transmission Line, this model demonstrates a good accuracy of prediction in different process, if the prediction length is less than two hours, and would be helpful for power grid departments when deciding to take action in advance to address potential icing disasters. PMID:25136653

  10. Mitigation of 50-60 Hz power line interference in geophysical data

    NASA Astrophysics Data System (ADS)

    Cohen, M. B.; Said, R. K.; Inan, U. S.

    2010-12-01

    The analysis of ELF/VLF radio data has broad applications for ionospheric and magnetospheric phenomena, lightning activity, long-range communications, and geophysical prospecting. However, recordings of ELF/VLF data on the ground are adversely affected by the presence of electromagnetic fields from 50-60 Hz power lines, whose harmonics can extend to many kilohertz and interfere with the detection of natural and man-made signals. Removal of this interference is complicated by the time-varying fundamental frequency of power lines and strongly varying characteristics across different power grids. We discuss two methods for isolation and then subtraction of this interference, by an adaptive filtering technique and with least squares matrix analysis. Methods for estimating the time-varying frequency are also discussed. A few variants of these techniques are applied both to simulated data and then to real data. It is found that least squares isolation gives superior results, although the adaptive filter is potentially more effective for poorly behaved power line interference with rapidly changing fundamental frequencies as well as being computationally more efficient.