Science.gov

Sample records for programming planning

  1. Effective family planning programs.

    PubMed

    Rosenfield, A G

    1973-01-01

    Organizational and content features of various national family planning programs are reviewed. The Thai program is cited as an example of a family planning program organized on a massive unipurpose compaign basis. The Korean and Taiwan programs have utilized special field workers while upgrading the general health care network. 3 major problems with family planning programs are: 1) the lack of experience with such programs; 2) lack of commitment at the highest political levels; and 3) medical conservatism. Utilization of all available contraceptive methods instead of reliance on 1 method would improve most programs. Nursing and auxiliary personnel could be trained to take over the work of physicians in family planning programs. This is already being done with IUD insertion and pill prescription in several programs. The postpartum tubal ligation approach has proven effective and should be extended. There is a place in all national programs for both the private and the commercial sectors. Incentives for clinics, personnel, and acceptors might spread family planning more rapidly. PMID:12309877

  2. Fermilab Program and Plans

    SciTech Connect

    Denisov, Dmitri

    2014-01-01

    This article is a short summary of the talk presented at 2014 Instrumentation Conference in Novosibirsk about Fermilab's experimental program and future plans. It includes brief description of the P5 long term planning progressing in US as well as discussion of the future accelerators considered at Fermilab.

  3. Planned Programming Pays Dividends

    ERIC Educational Resources Information Center

    Geraldi, Kevin M.

    2008-01-01

    In this article, the author explains that before beginning to create concert programs, it is important that ensemble conductors first develop a long-term curricular plan to which each individual program will contribute. He continues that if an ensemble curriculum is devised so that students make progress over the long term, dynamic growth can take…

  4. Transportation Outreach Program Plan

    SciTech Connect

    Not Available

    1991-08-01

    The Department of Energy (DOE) Transportation Management Program (TMP) is committed to providing opportunities for public interaction, working cooperatively with groups interested in or affected by DOE transportation, and providing information through the development and implementation of its Outreach Program. This Plan describes how the DOE plans to involve the public in its transportation programs. This Transportation Outreach Program Plan will assist the Secretary of Energy is carrying out his vision of the good neighbor'' policy. The Department of Energy encourages face to face interaction and welcomes comments from everyone. Outreach means to go beyond,'' and the TMP, through its Outreach Program, will hear and address the public's concerns and recommendations about transportation of hazardous and radioactive materials. The TMP Outreach Program is based on a commitment to two-way communication. The TMP coordinates transportation policy for all DOE programs to ensure consistent approaches issues and operations. The TMP conducts outreach by interacting with many groups interested in DOE transportation, facilitating resolution of issues and information exchange, and coordinating the DOE's transportation emergency preparedness capabilities. Many of the specific activities in transportation outreach are usually carried out by field and area offices. 4 figs., 2 tabs.

  5. ESnet Program Plan 1994

    SciTech Connect

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  6. SNS application programming plan.

    SciTech Connect

    Chu, C. M.; Galambos, J. D.; Wei, J.; Allen, C.; McGehee, P. M.; Malitsky, N.

    2001-01-01

    The plan for Spallation Neutron Source accelerator physics application programs is presented. These high level applications involve processing and managing information from the diagnostic instruments, the machine control system, models and static databases and will be used to investigate and control beam behavior. Primary components include an SNS global database and Java-based XAL Application Toolkit. A key element in the SNS application programs is time synchronization of data used in these applications, due to the short pulse (1 ms), pulsed (60 Hz) nature of the device. The data synchronization progress is also presented.

  7. ADS pilot program Plan

    NASA Technical Reports Server (NTRS)

    Clauson, J.; Heuser, J.

    1981-01-01

    The Applications Data Service (ADS) is a system based on an electronic data communications network which will permit scientists to share the data stored in data bases at universities and at government and private installations. It is designed to allow users to readily locate and access high quality, timely data from multiple sources. The ADS Pilot program objectives and the current plans for accomplishing those objectives are described.

  8. NASA program plan

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Major facts are given for NASA'S planned FY-1981 through FY-1985 programs in aeronautics, space science, space and terrestrial applications, energy technology, space technology, space transportation systems, space tracking and data systems, and construction of facilities. Competition and cooperation, reimbursable launchings, schedules and milestones, supporting research and technology, mission coverage, and required funding are considered. Tables and graphs summarize new initiatives, significant events, estimates of space shuttle flights, and major missions in astrophysics, planetary exploration, life sciences, environmental and resources observation, and solar terrestrial investigations. The growth in tracking and data systems capabilities is also depicted.

  9. Logistics planning for phased programs.

    NASA Technical Reports Server (NTRS)

    Cook, W. H.

    1973-01-01

    It is pointed out that the proper and early integration of logistics planning into the phased program planning process will drastically reduce these logistics costs. Phased project planning is a phased approach to the planning, approval, and conduct of major research and development activity. A progressive build-up of knowledge of all aspects of the program is provided. Elements of logistics are discussed together with aspects of integrated logistics support, logistics program planning, and logistics activities for phased programs. Continuing logistics support can only be assured if there is a comprehensive sequential listing of all logistics activities tied to the program schedule and a real-time inventory of assets.

  10. TWRS safety program plan

    SciTech Connect

    Calderon, L.M., Westinghouse Hanford

    1996-08-01

    Management of Nuclear Safety, Industrial Safety, Industrial Hygiene, and Fire Protection programs, functions, and field support resources for Tank Waste Remediation Systems (TWRS) has, until recently, been centralized in TWRS Safety, under the Emergency, Safety, and Quality organization. Industrial hygiene technician services were also provided to support operational needs related to safety basis compliance. Due to WHC decentralization of safety and reengineering efforts in West Tank Farms, staffing and safety responsibilities have been transferred to the facilities. Under the new structure, safety personnel for TWRS are assigned directly to East Tank Farms, West Tank Farms, and a core Safety Group in TWRS Engineering. The Characterization Project Operations (CPO) safety organization will remain in tact as it currently exists. Personnel assigned to East Tank Farms, West Tank Farms, and CPO will perform facility-specific or project-specific duties and provide field implementation of programs. Those assigned to the core group will focus on activities having a TWRS-wide or programmatic focus. Hanford-wide activities will be the responsibility of the Safety Center of Expertise. In order to ensure an effective and consistent safety program for TWRS under the new organization program functions, goals, organizational structure, roles, responsibilities, and path forward must be clearly established. The purpose of the TWRS Safety Program Plan is to define the overall safety program, responsibilities, relationships, and communication linkages for safety personnel under the new structure. In addition, issues associated with reorganization transition are addressed, including training, project ownership, records management, and dissemination of equipment. For the purpose of this document ``TWRS Safety`` refers to all safety professionals and technicians (Industrial Safety, Industrial Hygiene, Fire Protection, and Nuclear Safety) within the TWRS organization, regardless of their

  11. Nonclinical family planning programs.

    PubMed

    Bair, W D

    1978-01-01

    Reasons commonly advanced for providing family planning are the need for it as a health measure, as part of the basic human right of parents to plan their families, and as a measure to slow demographic growth. Provision of access to all couples desiring birth control, not just to the wealthy and educated, is a less frequently discussed reason. All these reasons require broad coverage in order to be effective. The author argues, using data on the relative health risks of contraceptive usage vs. pregnancy, that nonclinic distribution of contraceptives is consistent with responsible health considerations. The argument is buttressed by ethical considerations. The demand for family planning services is next considered, with the author arguing that availability of contraceptives is an important factor in increasing demand for them. The characteristics and users of nonclinic delivery systems are then discussed. Commercial distribution systems may provide services for up to 5% of women of fertile age, thus providing a useful supplement to organized and more highly subsidized programs. Noncommercial distribution -- household or community based systems -- has allowed contraceptive use to expand to levels of 20 or 25% and sometimes as high as 50%, in periods as short as a year and a half, at low cost. Community leaders have often proven to be more effective than clinic personnel in providing instruction and support to contraceptive users. PMID:12309775

  12. Explosive cyclogenesis program planned

    NASA Astrophysics Data System (ADS)

    Hadlock, Ron

    A research program to study explosive cyclogenesis of Atlantic winter storms is being planned by the Office of Naval Research (ONR; Washington, D.C.) and a team of investigators from universities and other meteorological and oceanographic institutions. The goals of the Experiment on Rapidly Intensifying Cyclones in the Atlantic (ERICA) are to develop an understanding of the fundamental physical processes in the atmosphere that lead to explosive cyclogenesis at sea,to identify measurable precursors that can be used for accurate operational dynamical meteorological forecast model predictions, andto determine the minimum set of these observations that is necessary for accurate forecasts of intense cyclogenesis at sea.The multiyear program efforts, including numerical modeling research, will benefit from the related Genesis of Atlantic Lows Experiment (GALE) and Canadian Atlantic Storms Program (CASP) field measurement episodes, which were recently completed (January-March 1986). ERICA's phase of intensive measurements in the field is scheduled for January-March 1989 in the North Atlantic, centered at approximately 40°N and 60°W.

  13. National transuranic program plan

    SciTech Connect

    Not Available

    1994-10-11

    As a result of various program initiatives, the U.S. generated and will continue to generate waste contaminated with radioactive materials. Because of increased awareness of the risks and special requirements to safely manage long-lived alpha-emitting radionuclides, a new category of radioactive waste, transuranic (TRU) waste, was adopted in 1970. Heads of Field Elements can determine that other alpha-contaminated wastes, peculiar to a specific site, must be managed as transuranic waste{close_quotes}. TRU waste is generated and stored at various DOE sites around the country. In December 1993, the National Transuranic Program Office (NTPO) was established as part of the Carlsbad Area Office (CAO) to integrate and coordinate the diverse organizational elements that contribute to the complex-wide management of TRU waste. Numerous sites with small TRU waste inventories are also part of the national TRU waste system. The majority of TRU waste is also contaminated with hazardous materials and is thus considered mixed waste. Mixed waste must be managed in compliance with all federal, state, and local regulations that are applicable to the radioactive and/or hazardous component of the waste. Each generator site is responsible for the management of its respective waste. Sites must plan and implement programs to minimize, characterize, package, treat, store, ship, and dispose of all TRU waste; construct required waste management facilities and equipment; obtain permits; perform site-specific National Environmental Policy Act (NEPA) analyses; conduct environmental studies; perform laboratory analyses; and certify that waste meets appropriate disposal facility criteria. Due to the toxicity and long half-lives of TRU radionuclides, TRU waste must be disposed in a manner that offers greater confinement than shallow land burial.

  14. LDRD FY 2014 Program Plan

    SciTech Connect

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  15. New Production Reactors Program Plan

    SciTech Connect

    Not Available

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

  16. Groundwater protection management program plan

    SciTech Connect

    Not Available

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ``Groundwater Protection Management Program Plan`` (groundwater protection plan) of sufficient scope and detail to reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

  17. Fiscal year 1987 program plan

    SciTech Connect

    Not Available

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

  18. Biomedical programs operations plans

    NASA Technical Reports Server (NTRS)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  19. Performance assurance program plan

    SciTech Connect

    Rogers, B.H.

    1997-11-06

    B and W Protec, Inc. (BWP) is responsible for implementing the Performance Assurance Program for the Project Hanford Management Contract (PHMC) in accordance with DOE Order 470.1, Safeguards and Security Program (DOE 1995a). The Performance Assurance Program applies to safeguards and security (SAS) systems and their essential components (equipment, hardware, administrative procedures, Protective Force personnel, and other personnel) in direct support of Category I and H special nuclear material (SNM) protection. Performance assurance includes several Hanford Site activities that conduct performance, acceptance, operability, effectiveness, and validation tests. These activities encompass areas of training, exercises, quality assurance, conduct of operations, total quality management, self assessment, classified matter protection and control, emergency preparedness, and corrective actions tracking and trending. The objective of the Performance Assurance Program is to capture the critical data of the tests, training, etc., in a cost-effective, manageable program that reflects the overall effectiveness of the program while minimizing operational impacts. To aid in achieving this objective, BWP will coordinate the Performance Assurance Program for Fluor Daniel Hanford, Inc. (FDH) and serve as the central point for data collection.

  20. Population Growth: Family Planning Programs.

    ERIC Educational Resources Information Center

    Doberenz, Alexander R., Ed.; Taylor, N. Burwell G., Ed.

    These proceedings of the second annual symposium on population growth bring together speeches and panel discussions on family planning programs. Titles of speeches delivered are: Communicating Family Planning (Mrs. Jean Hutchinson); Effects of New York's Abortion Law Change (Dr. Walter Rogers); The Law and Birth Control, Sterilization and Abortion…

  1. Art. Program Planning, Primary, Junior.

    ERIC Educational Resources Information Center

    York Borough Board of Education, Toronto (Ontario).

    Over 20 ideas for planning art programs for grades 1 through 6 are included in this planning guide. Introductory comments stress the individuality of children and caution art teachers not to judge by adult standards and not to direct lessons step-by-step or show how things should be drawn. Outdoor sketching is recommended as a way to develop…

  2. Wildlife monitoring program plan

    NASA Technical Reports Server (NTRS)

    Sebesta, P.; Arno, R.

    1979-01-01

    A plan for integrating the various requirements for wildlife monitoring with modern aerospace technology is presented. This plan is responsive to user needs, recognizes legal requirements, and is based on an evolutionary growth from domestic animals and larger animals to smaller, more scarce and remote species. The basis for animal study selection was made from the 1973 Santa Cruz Summer Study on Wildlife Monitoring. As techniques are developed the monitoring and management tasks will be interfaced with and eventually operated by the user agencies. Field efforts, aircraft and satellites, will be supplemented by laboratory investigations. Sixty percent of the effort will be in hardware research and development (satellite technology, microminiaturization) and the rest for gathering and interpreting data.

  3. Program Planning: The Embryonic Stage.

    ERIC Educational Resources Information Center

    Stone, Gwen

    The document examines a number of sex education programs and reviews some of the problems and issues educators encounter in planning and initiating sex education programs. Included is a discussion of population background of Polk County, Iowa and a presentation by school administrators of five reasons which favor the teaching of sex education: (1)…

  4. Program Planning Procedures Wall Chart.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento. Right to Read Unit.

    These ten program planning procedure wall charts include: "Right to Read Center Data," for identifying school, grade, enrollment by grade, size of community, ethnic balance, percentage on aid for Dependent Children, and transiency rate; "Needs Assessment Summary," for information on student performance, reading program, teacher performance,…

  5. Site Support Program Plan Infrastructure Program

    SciTech Connect

    1995-09-26

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  6. CEBAF - environmental protection program plan

    SciTech Connect

    1995-10-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan.

  7. Head Start Planned Variation Program.

    ERIC Educational Resources Information Center

    Klein, Jenny

    There is little agreement concerning which methods of preschool intervention are most effective. In order to evaluate several approaches to early childhood education, Project Head Start, in conjunction with Project Follow Through, has initiated the Planned Variation program. This year only a pilot project is underway with eight schools…

  8. Agricultural Occupations Programs Planning Guides

    ERIC Educational Resources Information Center

    Stitt, Thomas R.; And Others

    1977-01-01

    A set of program planning guides that include seven areas (1) Agricultural Production, (2) Agricultural Supplies and Services, (3) Agricultural Mechanics, (4) Agricultural Products, (5) Ornamental Horticulture, (6) Agricultural Resources, and (7) Forestry, were developed and introduced to high school applied biological and agricultural occupations…

  9. Planning-Programming-Budgeting Systems.

    ERIC Educational Resources Information Center

    Tudor, Dean

    Planning Programming and Budgeting Systems (PPBS) have been considered as either synonymous with abstract, advanced, mathematical systems analysis or as an advanced accounting and control system. If PPBS is to perform a useful function, both viewpoints must be combined such that a number of standardized procedures and reports are required and…

  10. Geothermal induced seismicity program plan

    SciTech Connect

    Not Available

    1981-03-01

    A plan for a National Geothermal Induced Seismicity Program has been prepared in consultation with a panel of experts from industry, academia, and government. The program calls for baseline seismic monitoring in regions of known future geothermal development, continued seismic monitoring and characterization of earthquakes in zones of geothermal fluid production and injection, modeling of the earthquake-inducing mechanism, and in situ measurement of stresses in the geothermal development. The Geothermal Induced Seismicity Program (GISP) will have as its objectives the evaluation of the seismic hazard, if any, associated with geothermal resource exploitation and the devising of a technology which, when properly utilized, will control or mitigate such hazards.

  11. Solid Waste Management Program Plan

    SciTech Connect

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  12. Transportation technology program: Strategic plan

    NASA Astrophysics Data System (ADS)

    1991-09-01

    The purpose of this report is to define the technology program required to meet the transportation technology needs for current and future civil space missions. It is a part of an integrated plan, prepared by NASA in part in response to the Augustine Committee recommendations, to describe and advocate expanded and more aggressive efforts in the development of advanced space technologies. This expanded program will provide a technology basis for future space missions to which the U.S. aspires, and will help to regain technology leadership for the U.S. on a broader front. The six aspects of this integrated program/plan deal with focused technologies to support space sciences, exploration, transportation, platforms, and operations as well as provide a Research and Technology Base Program. This volume describes the technologies needed to support transportation systems, e.g., technologies needed for upgrades to current transportation systems and to provide reliable and efficient transportation for future space missions. The Office of Aeronautics, Exploration, and Technology (OAET) solicited technology needs from the major agency technology users and the aerospace industry community and formed a transportation technology team (appendix A) to develop a technology program to respond to those needs related to transportation technologies. This report addresses the results of that team activity. It is a strategic plan intended for use as a planning document rather than as a project management tool. It is anticipated that this document will be primarily utilized by research & technology (R&T) management at the various NASA Centers as well as by officials at NASA Headquarters and by industry in planning their corporate Independent Research and Development (IR&D) investments.

  13. Transportation technology program: Strategic plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of this report is to define the technology program required to meet the transportation technology needs for current and future civil space missions. It is a part of an integrated plan, prepared by NASA in part in response to the Augustine Committee recommendations, to describe and advocate expanded and more aggressive efforts in the development of advanced space technologies. This expanded program will provide a technology basis for future space missions to which the U.S. aspires, and will help to regain technology leadership for the U.S. on a broader front. The six aspects of this integrated program/plan deal with focused technologies to support space sciences, exploration, transportation, platforms, and operations as well as provide a Research and Technology Base Program. This volume describes the technologies needed to support transportation systems, e.g., technologies needed for upgrades to current transportation systems and to provide reliable and efficient transportation for future space missions. The Office of Aeronautics, Exploration, and Technology (OAET) solicited technology needs from the major agency technology users and the aerospace industry community and formed a transportation technology team (appendix A) to develop a technology program to respond to those needs related to transportation technologies. This report addresses the results of that team activity. It is a strategic plan intended for use as a planning document rather than as a project management tool. It is anticipated that this document will be primarily utilized by research & technology (R&T) management at the various NASA Centers as well as by officials at NASA Headquarters and by industry in planning their corporate Independent Research and Development (IR&D) investments.

  14. National Mirror Fusion Program Plan

    SciTech Connect

    Gerich, C.A.

    1982-08-01

    This Plan is current as of August 1982. The major milestones listed herein represent an aggressive, success-oriented program paced primarily by technical results. Consistent with applicable government policies and the overall program planning of the Department's Office of Fusion Energy, this Plan assumes approval of the Mirror Program's next major step beyond MFTF-B - a deuterium-tritium (D-T) burning engineering reactor called the Fusion Power Demonstration (FPD) facility (formerly the Tandem Mirror Next Step). The near-term goal of the tandem mirror program is to lay the scientific and technical groundwork for an economically attractive, D-T fusion reactor design before the end of the 1980s. Construction of the FPD facility based on the tandem mirror could be initited around 1988. A second phase, complete with a nuclear power blanket demonstration, could be initiated in the mid-1990s, based on nuclear engineering data from a facility such as the Technology Demonstration Facility (TDF) described below. The outline of an acceptable tandem mirror reactor (TMR) design was first published in 1981, and will be further developed and described in the Mirror Advanced Reactor Study (MARS) during FY 1982-1983.

  15. Active Sites Environmental Monitoring Program: Program plan

    SciTech Connect

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1990-10-01

    DOE Order 5820.2A requires that low-level waste (LLW) disposal sites active on or after September 1988 and all transuranic (TRU) waste storage sites be monitored periodically to assure that radioactive contamination does not escape from the waste sites and pose a threat to the public or to the environment. This plan describes such a monitoring program for the active LLW disposal sites in SWSA 6 and the TRU waste storage sites in SWSA 5 North. 14 refs., 8 figs.

  16. Environmental Planning and Ecology Program Annual Report.

    SciTech Connect

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  17. Industrial Waste Reduction Program. Program plan

    SciTech Connect

    Not Available

    1991-10-24

    US industry generates over 12 billion tons of wastes each year. These wastes consist of undesirable by-products of industrial production that are discarded into our environment. Energy is an integral part of these wastes; it is found in the embodied energy of industrial feedstocks not optimally used, in the energy content of the wastes themselves, and in the energy needed to transport, treat, and dispose of wastes. Estimates of the potential energy savings from reducing industrial wastes range from three to four quadrillion Btu per year -- enough to meet the annual energy needs of 30 million American homes. This document presents a plan for the Industrial Waste Reduction Program, which has been designed to help achieve national goals for energy efficiency and waste minimization. The objective of the program is to improve the energy efficiency of industrial processes through cost-effective waste reduction. The initial program focus is on waste reduction opportunities in the production and use of chemicals, due to the significant amount of energy used in these activities and the large amounts of hazardous and toxic wastes they generate. The chemical industry will be the initial subject of a series of waste reduction opportunity assessments conducted as part of the program. Assessments of other industries and waste problems will follow.

  18. Handbook for the ACT Career Planning Program.

    ERIC Educational Resources Information Center

    American Coll. Testing Program, Iowa City, IA. Research and Development Div.

    Prepared by the Research and Development Division of the American College Testing (ACT) Program, this handbook contains information pertaining to the ACT Career Planning Program, a guidance program for students considering and entering post-high school career education programs. The primary instrument of the Career Planning Program is a Career…

  19. Program Planning Concepts in Solid Waste Management

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  20. Environmental Restoration Quality Program Plan

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  1. Program and Evaluation Planning Lite: Planning in the Real World

    ERIC Educational Resources Information Center

    Randolph, Justus J.; Eronen, Pasi J.

    2004-01-01

    Background: Although there are many high-quality models for program and evaluation planning, these models are often too intensive to be used in situations when time and resources are scarce. Additionally, there is little added value in using an elaborate and expensive program and evaluation planning procedure when programs are small or are planned…

  2. LLNL Waste Minimization Program Plan

    SciTech Connect

    Not Available

    1990-02-14

    This document is the February 14, 1990 version of the LLNL Waste Minimization Program Plan (WMPP). The Waste Minimization Policy field has undergone continuous changes since its formal inception in the 1984 HSWA legislation. The first LLNL WMPP, Revision A, is dated March 1985. A series of informal revision were made on approximately a semi-annual basis. This Revision 2 is the third formal issuance of the WMPP document. EPA has issued a proposed new policy statement on source reduction and recycling. This policy reflects a preventative strategy to reduce or eliminate the generation of environmentally-harmful pollutants which may be released to the air, land surface, water, or ground water. In accordance with this new policy new guidance to hazardous waste generators on the elements of a Waste Minimization Program was issued. In response to these policies, DOE has revised and issued implementation guidance for DOE Order 5400.1, Waste Minimization Plan and Waste Reduction reporting of DOE Hazardous, Radioactive, and Radioactive Mixed Wastes, final draft January 1990. This WMPP is formatted to meet the current DOE guidance outlines. The current WMPP will be revised to reflect all of these proposed changes when guidelines are established. Updates, changes and revisions to the overall LLNL WMPP will be made as appropriate to reflect ever-changing regulatory requirements. 3 figs., 4 tabs.

  3. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning....

  4. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Program planning. 632.255 Section 632.255 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning....

  5. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Program planning. 632.255 Section 632.255 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a)(1) In developing the summer...

  6. Implementing corporate wellness programs: a business approach to program planning.

    PubMed

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials. PMID:7575791

  7. Multi-Year Program Plan - Building Regulatory Programs

    SciTech Connect

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  8. Disposal phase experimental program plan

    SciTech Connect

    1997-01-31

    The Waste Isolation Pilot Plant (WIPP) facility comprises surface and subsurface facilities, including a repository mined in a bedded salt formation at a depth of 2,150 feet. It has been developed to safely and permanently isolate transuranic (TRU) radioactive wastes in a deep geological disposal site. On April 12, 1996, the DOE submitted a revised Resource Conservation and Recovery Act (RCRA) Part B permit application to the New Mexico Environment Department (NMED). The DOE anticipates receiving an operating permit from the NMED; this permit is required prior to the start of disposal operations. On October 29, 1996, the DOE submitted a Compliance Certification Application (CCA) to the US Environmental Protection Agency (EPA) in accordance with the WIPP land Withdrawal Act (LWA) of 1992 (Public Law 102-579) as amended, and the requirements of Title 40 of the Code of Federal Regulations (40 CFR) Parts 191 and 194. The DOE plans to begin disposal operations at the WIPP in November 1997 following receipt of certification by the EPA. The disposal phase is expected to last for 35 years, and will include recertification activities no less than once every five years. This Disposal Phase Experimental Program (DPEP) Plan outlines the experimental program to be conducted during the first 5-year recertification period. It also forms the basis for longer-term activities to be carried out throughout the 35-year disposal phase. Once the WIPP has been shown to be in compliance with regulatory requirements, the disposal phase gives an opportunity to affirm the compliance status of the WIPP, enhance the operations of the WIPP and the national TRU system, and contribute to the resolution of national and international nuclear waste management technical needs. The WIPP is the first facility of its kind in the world. As such, it provides a unique opportunity to advance the technical state of the art for permanent disposal of long-lived radioactive wastes.

  9. An Introduction to NCOA's Retirement Planning Program.

    ERIC Educational Resources Information Center

    Fitzpatrick, Edmund W.

    1980-01-01

    Describes the National Council on the Aging (NCOA)-Industry Consortium Retirement Planning Program, which consists of eight modules corresponding to eight major areas of retirement planning: life-style planning, financial planning, new careers, leisure time, health, interpersonal relationships, living arrangements, and community services. (SK)

  10. Planning for Impact: A Guide to Planning Effective Family Program.

    ERIC Educational Resources Information Center

    Hardy, James M.

    A document intended to provide program planning guidelines for Young Men's Christian Associations (YMCAs) desirous of working with families, recommends adherence to eight principles and following of five steps. The principles involve planning before action, fact finding and analysis, clear delineation of operational objectives, planning at all…

  11. Active Sites Environmental Monitoring Program: Program plan

    SciTech Connect

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1992-02-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of transuranic (TRU) waste and active low-level waste (LLW) facilities at Oak Ridge National Laboratory (ORNL) in accordance with US Department of Energy (DOE) Order 5820.2A. Active LLW facilities in Solid Waste Storage Area (SWSA) 6 include Tumulus I and Tumulus II, the Interim Waste Management Facility (IWMF), LLW silos, high-range wells, asbestos silos, and fissile wells. The tumulus pads and IWMF are aboveground, high-strength concrete pads on which concrete vaults containing metal boxes of LLW are placed; the void space between the boxes and vaults is filled with grout. Eventually, these pads and vaults will be covered by an engineered multilayered cap. All other LLW facilities in SWSA 6 are below ground. In addition, this plan includes monitoring of the Hillcut Disposal Test Facility (HDTF) in SWSA 6, even though this facility was completed prior to the data of the DOE order. In SWSA 5 North, the TRU facilities include below-grade engineered caves, high-range wells, and unlined trenches. All samples from SWSA 6 are screened for alpha and beta activity, counted for gamma-emitting isotopes, and analyzed for tritium. In addition to these analytes, samples from SWSA 5 North are analyzed for specific transuranic elements.

  12. PC Squared: Programming Computers, Planning Careers.

    ERIC Educational Resources Information Center

    Cianni, Mary; Growney, Andrea

    1987-01-01

    Describes a program designed to encourage high school girls to learn about computers and to plan for careers. The girls in the program were introduced to programming, hardware, and software. They learned about themselves in relation to careers and developed skills to help them implement their career plans in a world in which computers are a common…

  13. Total quality management program planning

    SciTech Connect

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  14. Satellite services system program plan

    NASA Technical Reports Server (NTRS)

    Hoffman, Stephen J.

    1985-01-01

    The purpose is to determine the potential for servicing from the Space Shuttle Orbiter and to assess NASA's role as the catalyst in bringing about routine on-orbit servicing. Specifically this study seeks to determine what requirements, in terms of both funds and time, are needed to make the Shuttle Orbiter not only a transporter of spacecraft but a servicing vehicle for those spacecraft as well. The scope of this effort is to focus on the near term development of a generic servicing capability. To make this capability truly generic and attractive requires that the customer's point of veiw be taken and transformed into a widely usable set of hardware. And to maintain a near term advent of this capability requires that a minimal reliance be made on advanced technology. With this background and scope, this study will proceed through three general phases to arrive at the desired program costs and schedule. The first step will be to determine the servicing requirements of the user community. This will provide the basis for the second phase which is to develop hardware concepts to meet these needs. Finally, a cost estimate will be made for each of the new hardware concepts and a phased hardware development plan will be established for the acquisition of these items based on the inputs obtained from the user community.

  15. Nevada Experiments and Operations Program (N Program) Management Plan

    SciTech Connect

    Nattrass, L.; Anastasio, M.R.

    2000-02-01

    This plan briefly describes the Lawrence Livermore National Laboratory (LLNL) institutional structure and how Nevada Experiments and Operations Program (N Program's) organization fits within this structure, roles and responsibilities, and management processes that govern N Program activities. This plan also serves as the Integrated Safety Management (ISM) Implementation Plan for N Program work. This plan applies to all work performed by and for LLNL that falls under the oversight of DOE/NV except LLNL activities in support of the Yucca Mountain Project Office (YMPO).

  16. Instructional Program Planning for Outdoor Education.

    ERIC Educational Resources Information Center

    Garbutt, Barbara; And Others

    A guide on instructional program planning for outdoor education, prepared for Oakland County (Michigan) teachers, contains suggestions for program planning and lists information sources on suitable outdoor activities. The purpose of outdoor education is defined as being: "to enrich, vitalize and complement content areas of the school curriculum by…

  17. Compare and Contrast Program Planning Models

    ERIC Educational Resources Information Center

    Baskas, Richard S.

    2011-01-01

    This paper will examine the differences and similarities between two program planning models, Tyler and Caffarella, to reveal their strengths and weaknesses. When adults are involved in training sessions, there are various program planning models that can be used, depending on the goal of the training session. Researchers developed these models…

  18. Ocean energy systems: Multiyear program plan

    NASA Astrophysics Data System (ADS)

    1980-05-01

    Specific planned activities to be conducted by the Department of Energy in connection with the Ocean Energy System Program for FY 1979 through FY 1984 are described. Program funding is presently 95 percent OTEC, with 5 percent directed toward alternate energy sources such as salinity gradients waves and currents, technical status, ocean energy systems resource requirements, issues, and a management plan are discussed.

  19. NASA aerospace pyrotechnically actuated systems: Program plan

    NASA Technical Reports Server (NTRS)

    Schulze, Norman R.

    1992-01-01

    The NASA Aerospace Pyrotechnically Actuated Systems (PAS) Program, a focused technology program, is being initiated to enhance the reliability, safety, and performance of pyrotechnically actuated systems. In broad terms, this Program Plan presents the approach that helps to resolve concerns raised by the NASA/DOD/DOE Aerospace Pyrotechnic Steering Committee. This Plan reflects key efforts needed in PAS technology. The resources committed to implement the Program will be identified in the Program Implementation Plan (PIP). A top level schedule is included along with major Program milestones and products. Responsibilities are defined in the PIP. The Plan identifies the goals and detailed objectives which define how those goals are to be accomplished. The Program will improve NASA's capabilities to design, develop, manufacture, and test pyrotechnically actuated systems for NASA's programs. Program benefits include the following: advanced pyrotechnic systems technology developed for NASA programs; hands-on pyrotechnic systems expertise; quick response capability to investigate and resolve pyrotechnic problems; enhanced communications and intercenter support among the technical staff; and government-industry PAS technical interchange. The PAS Program produces useful products that are of a broad-based technology nature rather than activities intended to meet specific technology objectives for individual programs. Serious problems have occurred with pyrotechnic devices although near perfect performance is demanded by users. The lack of a program to address those problems in the past is considered a serious omission. The nature of problems experienced as revealed by a survey are discussed and the origin of the program is explained.

  20. 24 Command Fire Improvement Action Program Plan

    SciTech Connect

    GRIFFIN, G.B.

    2000-12-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

  1. Natural Gas Multi-Year Program Plan

    SciTech Connect

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  2. Active sites environmental monitoring Program - Program Plan: Revision 2

    SciTech Connect

    Morrissey, C.M.; Hicks, D.S.; Ashwood, T.L.; Cunningham, G.R.

    1994-05-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of active low-level-waste (LLW) and transuranic (TRU) waste facilities at Oak Ridge National Laboratory (ORNL). Several changes have recently occurred in regard to the sites that are currently used for waste storage and disposal. These changes require a second set of revisions to the ASEMP program plan. This document incorporates those revisions. This program plan presents the organization and procedures for monitoring the active sites. The program plan also provides internal reporting levels to guide the evaluation of monitoring results.

  3. Ground water protection management program plan

    SciTech Connect

    Not Available

    1994-02-01

    U.S. Department of Energy (DOE) Order 5400.1 requires the establishment of a ground water protection management program to ensure compliance with DOE requirements and applicable federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office was prepared this Ground Water Protection Management Program Plan (ground water protection plan) whose scope and detail reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter III, for special program planning. This ground water protection plan highlights the methods designed to preserve, protect, and monitor ground water resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies technical guidance documents and site-specific documents for the UMTRA Project ground water protection management program. In addition, the plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA Project sites.

  4. Hazardous Waste Remedial Actions Program: Remedial Actions Planning Program Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1989-04-01

    The purpose of this Plan is to describe the quality assurance (QA) requirements for the RAP Program by identifying the quality elements to be controlled and specifying how they will be controlled. The activities for which control elements will be identified include those relating to: preparation, review, and approval of plans, reports, and studies; execution of field and analytical work by subcontractors and other agents; control of subcontractors and other agents during other phases of work; and actions internal to the RAP Program to ensure proper execution of projects.

  5. The ACT Career Planning Program

    ERIC Educational Resources Information Center

    Healy, Charles C.

    1973-01-01

    The CPP is a set of tests and inventories designed to help students who are making career plans to use information about their measured aptitudes, inventoried interests, self-reported competencies, values, and grades. The tests and inventories were especially constructed and normed for students considering junior college and vocational-technical…

  6. Building Technologies Program Multi-Year Program Plan Program Portfolio Management 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for program portfolio management, including the program portfolio management process, program analysis, performance assessment, stakeholder interactions, and cross-cutting issues.

  7. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  8. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  9. Wind Shear radar program future plans

    NASA Technical Reports Server (NTRS)

    Robertson, Roy E.

    1991-01-01

    The status of the Windshear Radar Program at the Collins Air Transport Division of Rockwell International is given in viewgraph form. Topics covered include goals, modifications to the WXR-700 system, flight test plans, technical approaches, design considerations, system considerations, certification, and future plans.

  10. Tank waste remediation system environmental program plan

    SciTech Connect

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  11. Guidelines for Planning the School Breakfast Program.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta. Office of School Administrative Services.

    The Child Nutrition Act of 1966 as amended provides cash and food assistance to local school systems for breakfast programs to help them improve diets of young people. These guidelines for planning the school breakfast are intended to help food service directors, supervisors and managers plan breakfast menus that will provide 1/4 to 1/3 of the…

  12. Program plan: DWPF/HLWDP stirred Melter Program Plan

    SciTech Connect

    Smith, M.E.

    1994-02-28

    Slurry Fed Melters (SFM) have been developed in the United States, Europe, and Japan for the conversion of high-level radioactive waste (HLW) to borosilicate glass for permanent disposal. The newest design, the stirred melter, combines the high production rates and high glass quality features of the Joule-heated melters with the low-cost, compact, simple maintenance features of the pot melters. However, further engineering design and demonstrations are needed to operate the stirred melter on a large scale. This document outlines the program which develops a full scale stirred melter for the DWPF (240 pph), and provides a basis which will allow further scale-up of the technology for use in the Hanford High Level Waste Disposal Program (HLWDP) for up to four times the reference capacity.

  13. Quality assurance program plan for Building 324

    SciTech Connect

    Tanke, J.M.

    1997-05-22

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 324. This plan supersedes the PNNL Nuclear Facilities Quality Management System Description, PNL-NF-QMSD, Revision 2, dated March 1996. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements.

  14. Planning integration FY 1996 program plan. Revision 1

    SciTech Connect

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M&I) contract.

  15. TROPOSPHERIC AEROSOL PROGRAM, PROGRAM PLAN, MARCH 2001

    SciTech Connect

    SCHWARTZ,S.E.; LUNN,P.

    2001-03-01

    The goal of Tropospheric Aerosol Program (TAP) will be to develop the fundamental scientific understanding required to construct tools for simulating the life cycle of tropospheric aerosols--the processes controlling their mass loading, composition, and microphysical properties, all as a function of time, location, and altitude. The TAP approach to achieving this goal will be by conducting closely linked field, modeling, laboratory, and theoretical studies focused on the processes controlling formation, growth, transport, and deposition of tropospheric aerosols. This understanding will be represented in models suitable for describing these processes on a variety of geographical scales; evaluation of these models will be a key component of TAP field activities. In carrying out these tasks TAP will work closely with other programs in DOE and in other Federal and state agencies, and with the private sector. A forum to directly work with our counterparts in industry to ensure that the results of this research are translated into products that are useful to that community will be provided by NARSTO (formerly the North American Research Strategy on Tropospheric Ozone), a public/private partnership, whose membership spans government, the utilities, industry, and university researchers in Mexico, the US, and Canada.

  16. Agricultural Products: Program Planning Guide: Volume 4.

    ERIC Educational Resources Information Center

    Welton, Richard; Robb, Sam

    The program planning guide for agricultural products was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of meat and meat byproducts, dairy processing, fruit and vegetable…

  17. Agricultural Resources: Program Planning Guide: Volume 6.

    ERIC Educational Resources Information Center

    German, Carl; And Others

    The program planning guide for agricultural resources was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of forests, recreation, soil, wildlife, and other agricultural…

  18. Agricultural Production: Program Planning Guide: Volume 1.

    ERIC Educational Resources Information Center

    Rich, William; Wood, Eugene

    The program planning guide for agricultural production was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of animal science, plant science, farm mechanics, and farm business…

  19. Planning and Implementing Career Education Programs: Perspectives.

    ERIC Educational Resources Information Center

    Crim, Alonzo A.; And Others

    The collection of six papers offers perspectives on planning and implementing career education programs. The first paper, the Introduction (David Goodwin), deals with program implementation. The second paper, Priorities in Career Education (Alonzo A. Crim), describes the historical origins of career education in the Atlanta school system with a…

  20. Ornamental Horticulture: Program Planning Guide: Volume 5.

    ERIC Educational Resources Information Center

    Ross, Roger R.; Stitt, Thomas R.

    The program planning guide for ornamental horticulture was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of arboriculture, floriculture, greenhouse operation and management,…

  1. A Guide to Planning Alcoholism Treatment Programs.

    ERIC Educational Resources Information Center

    McGough, Dixie P.; Hindman, Margaret H.

    This guide contains information from the alcoholism literature and from interviews with people in state alcoholism agencies, major professional associations, and public and private service programs. It is designed to help readers plan and develop community alcoholism programs by providing an overview of the many considerations involved in starting…

  2. Agricultural Mechanics: Program Planning Guide: Volume 3.

    ERIC Educational Resources Information Center

    Bristol, Benton K.

    The program planning guide for agricultural mechanics was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of agricultural power and machinery, structural and conveniences,…

  3. Planning an Education Program for Dental Hygienists.

    ERIC Educational Resources Information Center

    Bruce, Harry W.; And Others

    Intended for adaptation to local situations, the handbook was prepared to assist interested groups to determine whether a dental hygiene educational program is needed and feasible, and to supply basic guidelines for planning. The introduction deals with dental hygiene in preventive dentistry and the historical development of educational programs.…

  4. Forestry: Program Planning Guide: Volume 7.

    ERIC Educational Resources Information Center

    Roth, Paul L.; And Others

    The program planning guide for forestry was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of forests, forest protection, logging, wood utilization, recreation, and special…

  5. The 1989 long-range program plan

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The President's National Space Policy of 1988 reaffirms that space activities serve a variety of vital national goals and objectives, including the strengthening of U.S. scientific, technological, political, economic, and international leadership. The new policy stresses that civil space activities contribute significantly to enhancing America's world leadership. Goals and objectives must be defined and redefined, and each advance toward a given objective must be viewed as a potential building block for future programs. This important evolutionary process for research and development is reflected, describing NASA's program planning for FY89 and later years. This plan outlines the direction of NASA's future activities by discussing goals, objectives, current programs, and plans for the future. The 1989 plan is consistent with national policy for both space and aeronautics, and with the FY89 budget that the President submitted to Congress in February 1988.

  6. Space radiation health program plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The Space Radiation Health Program intends to establish the scientific basis for the radiation protection of humans engaged in the exploration of space, with particular emphasis on the establishment of a firm knowledge base to support cancer risk assessment for future planetary exploration. This document sets forth the technical and management components involved in the implementation of the Space Radiation Health Program, which is a major part of the Life Sciences Division (LSD) effort in the Office of Space Science and Applications (OSSA) at the National Aeronautics and Space Administration (NASA). For the purpose of implementing this program, the Life Sciences Division supports scientific research into the fundamental mechanisms of radiation effects on living systems and the interaction of radiation with cells, tissues, and organs, and the development of instruments and processes for measuring radiation and its effects. The Life Sciences Division supports researchers at universities, NASA field centers, non-profit research institutes and national laboratories; establishes interagency agreements for cooperative use and development of facilities; and conducts a space-based research program using available and future spaceflight vehicles.

  7. Materials Characterization Center program plan

    SciTech Connect

    Nelson, R.D.; Ross, W.A.; Hill, O.F.; Mendel, J.E.; Merz, M.D.; Turcotte, R.P.

    1980-03-01

    The Materials Characterization Center (MCC) has been established at Pacific Northwest Laboratory as part of the Materials Characterization Organization for providing an authoritative, referenceable basis for establishing nuclear waste material properties and test methods. The MCC will provide a data base that will include information on the components of the waste emplacement package - the spent fuel or processed waste form and the engineered barriers - and their interaction with each other and as affected by the environment. The MCC will plan materials testing, develop and document procedures, collect and analyze existing materials data, and conduct tests as necessary.

  8. Program planning: a total quality approach.

    PubMed

    Dees, J P; Garcia, M A

    1995-05-01

    1. Deming's concepts for total quality management/continuous quality improvement are the basis for a tool occupational health nurses can apply in health program planning. 2. The program planning model provides a framework for systematically implementing, evaluating, and improving products and services. In the current business environment, this is critical to success and to demonstration of the value of occupational health services to a company. 3. A case study describing implementation of a medical case management program illustrates application of the model in a real life situation. PMID:7766248

  9. Microgravity Program strategic plan, 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The all encompassing objective of the NASA Microgravity Program is the use of space as a lab to conduct research and development. The on-orbit microgravity environment, with its substantially reduced buoyancy forces, hydrostatic pressures, and sedimentation, enables the conduction of scientific studies not possible on Earth. This environment allows processes to be isolated and controlled with an accuracy that cannot be obtained in the terrestrial environment. The Microgravity Science and Applications Div. has defined three major science categories in order to develop a program structure: fundamental science, including the study of the behavior of fluids, transport phenomena, condensed matter physics, and combustion science; materials science, including electronic and photonic materials, metals and alloys, and glasses and ceramics; and biotechnology, focusing on macromolecular crystal growth as well as cell and molecular science. Experiments in these areas seek to provide observations of complex phenomena and measurements of physical attributes with a precision that is enabled by the microgravity environment.

  10. Information Technology Standards Program management plan

    SciTech Connect

    1998-05-01

    This document presents a logical and realistic plan to implement the Information Technology (IT) Standards Program throughout the Department of Energy (DOE). It was developed by DOE Chief Information Officer (CIO) staff, with participation from many other individuals throughout the DOE complex. The DOE IT Standards Program coordinates IT standards activities Department-wide, including implementation of standards to support the DOE Information Architecture. The Program is voluntary, participatory, and consensus-based. The intent is to enable accomplishment of the DOE mission, and the Program is applicable to all DOE elements, both Federal and contractor. The purpose of this document is to describe the key elements of the DOE IT Standards Program.

  11. Natural gas strategic plan and program crosscut plans

    SciTech Connect

    1995-06-01

    The natural gas strategic plan recognizes the challenges and opportunities facing increased U.S. natural gas use. Focus areas of research include natural gas supply, delivery, and storage, power generation, industrial, residential and commercial, natural gas vehicles, and the environment. Historical aspects, mission, situation analysis, technology trends, strategic issues, performance indicators, technology program overviews, and forecasting in the above areas are described.

  12. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect

    POWELL, P.A.

    2000-03-29

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  13. Integrated propulsion technology demonstrator. Program plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.

  14. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  15. Building Technologies Program Planning Summary

    SciTech Connect

    none,

    2009-11-01

    The U.S. Department of Energy’s (DOE) Building Technologies Program (BTP) works in partnership with industry, state, municipal, and other federal organizations to achieve the goals of marketable net-zero energy buildings. To carry out its mission, BTP involves builders; appliance, window, lighting, operational systems, and component manufacturers; and end users in setting the program’s research priorities. These groups advise and help guide BTP through implementing, deploying, and standardizing new technologies, equipment, and processes being developed and tested in DOE’s national laboratories and in real-world applications in many U.S. communities.

  16. Building Technologies Program Multi-Year Program Plan Program Overview 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan Program Overview 2008, including market overview and federal role, program vision, mission, design and structure, and goals and multi-year targets.

  17. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  18. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  19. Program change through mental health planning.

    PubMed

    Fogelso, F B; Demone, H W

    1969-02-01

    Planning for innovative program change is examined through references to selected experiences of the Massachusetts Mental Health Planning Project. The planning field was extremely complex and populated by a vast array of divergent forces. In the absence of an organization accepted as a neutral sanctioning body, the planning organism itself must develop some autonomy and positive sanction. It must develop credibility as a legitimate change system. Conscious mechanisms must be developed to insure interaction. Stressed factors are: open communication, two-way participation, flexibility and clear objectives. Dissent to recommendations may be non-directed, or aimed at specific elements of the innovative change. Strategies of neutralization of conflict are necessary. The planning body must engage in a series of everchanging flexible coalitions. PMID:24178692

  20. NASA: 1986 long-range program plan

    NASA Technical Reports Server (NTRS)

    1985-01-01

    For the years beyond FY 1986, the plan consists of activities that are technologically possible and considered to be in the national interest. Its implementation will ensure logical and continued progress in reaching the Nation's goals in aeronautics and space, consistent with the responsibilities assigned NASA by the National Aeronautics and Space Act of 1958, as amended. The major features of the programs are described in detail and the nature of the aeronautics and space programs beyond the year 2000 are projected. The abbreviations and acronyms that appear in this report are listed. The status of NASA's plans are summarized at the time of its preparation.

  1. 49 CFR 659.19 - System safety program plan: contents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false System safety program plan: contents. 659.19... State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall... safety program and describes the authority that establishes the system safety program plan. (b) A...

  2. 49 CFR 659.19 - System safety program plan: contents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false System safety program plan: contents. 659.19... State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall... safety program and describes the authority that establishes the system safety program plan. (b) A...

  3. Lightweight materials for transportation: Program plan

    SciTech Connect

    Not Available

    1993-07-01

    This Program Plan has been prepared by the Office of Transportation Materials in response to a request by the House Committee on Appropriations. It recognizes that a significant commitment to long-term, stable materials research and development (R&D) is required to realize the benefits of lighter weight vehicles, including economic, environmental and energy related benefits. Extensive input was obtained from the major US automakers and from representative materials and component suppliers. Considerable interaction with the key members of the US Automotive Materials Partnership (USAMP) has ensured consistency of technical direction. The program will support R&D activity at industrial sites through competitively bid subcontracts with cost sharing anticipated at 30--50%, with the higher amounts in process scale-up and manufacturing technology development. The recommended LWM Program will enable industry to develop pecessary technology by utilizing their capabilities as well as accessing supporting technology at national laboratories, universities, ongoing program activity at NASA, DoD, DOT, NIST, etc., and thereby leverage industry resources through integrated team approaches. Many individual program efforts are currently in place that address small portions of the overall needs of the LWM Program, both within DOE and in other agencies. Cognizance of these and overall integration of research activities are planned as significant program management tasks. Because of the international nature of the automobile business, benchmarking of foreign technology and tracking of worldwide developments are also key program elements.

  4. ARCTIC CONTAMINANTS RESEARCH PROGRAM: RESEARCH PLAN

    EPA Science Inventory

    This research plan was initially intended to contain the information needed to evaluate the U.S. Environmental Protection Agency (EPA) Arctic Contaminant Research Program (ACRP). t served as a basis for discussion at a peer review, and has been revised to incorporate changes and ...

  5. Fiscal Year 2007 Program Performance Plan

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    The strategic goals and objectives set forth in the Department of Education's "FY (Fiscal Year) 2002-2007 Strategic Plan" form the context for the broad outcomes that the Department believes should characterize American education. The Department administers more than 150 programs in support of these goals and objectives. This "FY 2007 Program…

  6. Microcomputer Applications in Educational Program Planning Development.

    ERIC Educational Resources Information Center

    Morgan, James M.

    The Cincinnati Public Schools have been exploring new applications of computers in the areas of program planning, management, and evaluation. For the past 10 years, they have collected and computer-stored information on student, staff, administrative, and socioeconomic variables for each school. Data on a selected set of the variables best…

  7. SOCIAL ACTION AND INTERACTION IN PROGRAM PLANNING.

    ERIC Educational Resources Information Center

    BEAL, GEORGE M.; AND OTHERS

    TWO RESEARCH FRAMEWORKS, SOCIAL ACTION AND GROUP FORMATION AND MAINTENANCE, WERE CHOSEN TO ANALYZE THE EFFECTIVENESS OF COMMUNICATION STRATEGIES EMPLOYED BY EXTENSION WORKERS. IN A STUDY ON THE INTRODUCTION OF PROGRAM PLANNING INTO A COUNTY, THE FULFILLMENT OF EACH OF 34 STEPS IN THE SOCIAL ACTION PROCESS WAS ANALYZED AND FOUND TO BE ONLY SOMEWHAT…

  8. Alternative Training Using Selected Program Planning Concepts.

    ERIC Educational Resources Information Center

    Zappala, John

    1996-01-01

    Discusses a study to determine the extent that Michigan Adult Education Alternative Training (AEAT) providers used selected concepts of systematic planning in developing training programs. Finds that 55.6% of 65 responding AEAT planners utilized the concepts. Suggests that planners should also incorporate political and practical considerations.…

  9. Guide for Program Planning: Medical Laboratory Technician.

    ERIC Educational Resources Information Center

    Kahler, Carol, Ed.; And Others

    Prepared by the American Association of Junior Colleges and the National Council on Medical Technology Education, this guide discusses programs for career-entry supportive medical laboratory personnel which have been cooperatively planned by junior college personnel and the medical community, particularly pathologists and medical technologists.…

  10. Life Planning Education: A Youth Development Program.

    ERIC Educational Resources Information Center

    Center for Population Options, Washington, DC.

    This document presents the curriculum guide for Life Planning Education, a youth development program that focuses on two of the most important tasks teenagers face: preparing for the world of work and dealing with their own sexual and reproductive development, feelings, and behaviors. These two tasks are integrated in the curriculum in a way that…

  11. Vocational Education Statistical Data Plans and Programs.

    ERIC Educational Resources Information Center

    Schwartz, Mark

    This document provides information on the Data on Vocational Education (DOVE) plan, which has provided the National Center for Education Statistics (NCES) with a framework on which a viable data collection and dissemination program is being constructed for vocational education. A section on the status of DOVE discusses the attainment of the…

  12. Program Plan for Community College Home Economics.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    This guide outlines the core curriculum and articulation plans that were developed by a home economics task force for the purpose of improving and standardizing home economics education programs at community colleges throughout California. The first five chapters deal with the following subject areas addressed in home economics education: child…

  13. National NIF Diagnostic Program Interim Management Plan

    SciTech Connect

    Warner, B

    2002-04-25

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  14. VCE testbed program planning and definition study

    NASA Technical Reports Server (NTRS)

    Westmoreland, J. S.; Godston, J.

    1978-01-01

    The flight definition of the Variable Stream Control Engine (VSCE) was updated to reflect design improvements in the two key components: (1) the low emissions duct burner, and (2) the coannular exhaust nozzle. The testbed design was defined and plans for the overall program were formulated. The effect of these improvements was evaluated for performance, emissions, noise, weight, and length. For experimental large scale testing of the duct burner and coannular nozzle, a design definition of the VCE testbed configuration was made. This included selecting the core engine, determining instrumentation requirements, and selecting the test facilities, in addition to defining control system and assembly requirements. Plans for a comprehensive test program to demonstrate the duct burner and nozzle technologies were formulated. The plans include both aeroacoustic and emissions testing.

  15. The 1985 long-range program plan

    NASA Technical Reports Server (NTRS)

    1984-01-01

    That continual evolution of NASA's research and development, is reflected in the missions, goals, and objectives planned for FY1985 and later years, in accordance with the responsibilities by the National Aeronautics and Space Act of 1958, as amended. New starts for the next ten years and space program activities to year 2000 are highlighted including space science and applications, space flight, space station, space tracking and data systems, and space research and technology. Space programs for the early 21st century and aeronautics programs up to and beyond the year 2000 are also covered.

  16. India: New family planning program direction outlined.

    PubMed

    1977-01-01

    The focus of the current Family Welfare Program in India is education and active community involvement rather than coercion and compulsion. The government is totally committed to the program and has indicated that it will spare no efforts to motivate people to voluntarily accept family planning. However, there is a need for family planning efforts to include all aspects of family welfare, particularly those designed to promote the health of mothers and children. All family planning methods will be made available, and the family will be free to choose the method they prefer. As part of the program, employees of the Union government, State governments, autonomous and local bodies are expected to set an example and adopt the small family norm. The policy statement made by Mr. Raj Narain, Minister of Health and Family Welfare, revealed the government's decision not to legislate, either at the national or the State level, for compulsory sterilization. Sterilization services will be available free of charge to those who voluntarily choose this method. A plan for training indigenous midwives will be implemented as part of the program in order that maternity services may be available to all expectant mothers. Additionally, in recognition of the direct correlation between illiteracy and fertility and between infant/maternal mortality and age at marriage, the government will introduce legislation to raise the minimum age at marriage to 18 years for girls and to 21 years for boys. The plan is for trade unions, Chambers of Commerce, cooperative societies, women's organizations, teachers' federation, district councils, and other voluntary institutions to be associated intimately with the educational campaign launching the Family Welfare Program. PMID:12260383

  17. Photovoltaics program plan, FY 1991--FY 1995

    SciTech Connect

    Not Available

    1991-10-01

    This program plan describes the goals and philosophy of DOE National Photovoltaics Program and its major research and development activities for fiscal years (FY) 1991 through 1995. The plan represents a consensus among researchers and manufacturers, as well as current and potential users of photovoltaics (PV). It defines the activites that we believe are necessary to continue the rapid progress toward acceptance of photovoltaics as a serious candidate for cost-competitive electric power generation by the utility, transportation, buildings, and industrial sectors. A succesful National Photovoltaics Program will help achieve many of our national priorities. The mission of the National Photovoltaics Program is to help US industry to develop photovoltaic technology for large-scale generation of economically competitive electric power in the United States, making PV a significant part of our national energy mix. To fully achieve this, we must continue to work toward the long-term goals established in our previous program plan: reducing the price of delivered electricity to 5 to 6 cents per kilowatt-hour (kWh), increasing lifetimes to 30 years, and increasing module efficiencies to 15% for flat-plate and 25% for concentrator technologies. If progress continues at its current pace, we expect that the PV industry will have installed at least 1000 megawatts (MW) of capacity in the United States and 500 MW internationally by the year 2000.

  18. Natural and accelerated bioremediation research program plan

    SciTech Connect

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of the solution to DOE`s environmental problems.

  19. Waste Management Program management plan. Revision 1

    SciTech Connect

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  20. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  1. Review of Global Change Research Program plan

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-01-01

    The draft 10-year strategic plan for the U.S. Global Change Research Program (USGCRP), which proposes broadening the scope of the program from climate change only to climate change and climaterelated global changes, “is an important step in the right direction,” according to a 5 January review of the plan by a committee of the U.S. National Research Council (NRC) of the National Academies. However, the committee also said that the program's legislative mandate is even broader in allowing USGCRP to address many aspects of global change including climate change, the global hydrological cycle, and widespread land use changes. “The Program's legislative mandate is to address all of global change, whether or not related to climate. The Committee concurs that this broader scope is appropriate, but realizes that such an expansion may be constrained by budget realities and by the practical challenge of maintaining clear boundaries for an expanded program,” the report states. “We encourage sustained efforts to expand the Program over time, along with efforts to better define and prioritize what specific topics are included within the bounds of global change research.”

  2. Disaster planning for peritoneal dialysis programs.

    PubMed

    Kleinpeter, Myra A; Norman, Lisa D; Krane, N Kevin

    2006-01-01

    Because of increased intensity of hurricanes in the Gulf Coast region of the United States, peritoneal dialysis (PD) programs have been disrupted and patients relocated temporarily following these catastrophic events. We describe the disaster planning, implementation, and follow-up that occurred in one such PD program in New Orleans following Hurricane Katrina. Each year at the beginning of the North American hurricane season, the PD program's disaster plan is reviewed by clinic staff and copies are distributed to patients. Patients are instructed to assemble a disaster kit and are provided with contact numbers for dialysis suppliers and for a PD program in their planned evacuation city. In July 2005, this disaster plan was tested when an early tropical storm and hurricane entered the Gulf and several patients briefly relocated or evacuated because of power loss and then returned without incident. However, when Hurricane Katrina, a category 5 storm, was predicted to strike the metropolitan area, patients were notified by telephone to evacuate, and contact information, including their evacuation city and telephone and cellular phone numbers, was obtained. Patients were also reminded to take all medications, bottled water, antibacterial soap, hand sanitizer, and 4-5 days of PD supplies. Following the storm, telephone and cellular phone services were severely disrupted. However, text messaging was available to contact patients to confirm safety and to provide further instructions. Arrangements with the major dialysis suppliers to ship emergency supplies to new locations were made by the PD nurse and the patients. Only 2 of 22 patients required hospitalization because of complications resulting from evacuation failure, contamination, and inability to perform dialysis for a prolonged period of time. Both of these patients were quickly released and have continued PD. Following the event, all patients remained on PD, and most have planned to return to their home PD

  3. Repository-Based Software Engineering Program: Working Program Management Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  4. Why some family planning program fail.

    PubMed

    1976-04-01

    40 experts representing Nepal, Malaysia, Thailand, Singapore, Korea, and the Philippines participated in a 3-day workshop in Manila in March 1976 for the purpose of discussing and proposing ways of dealing with the financial problems confronting the population programs of the individual countries. The Inter-Governmental Coordinating Committee for Southeast Asia Family/Population Planning sponsored the workshop. The recommendations made at the meeting were: 1) standardization of financing reporting procedures by the region's country programs on family planning; 2) closer coordination between donor agencies and policy-making bodies of country programs in the disbursement of funds; 3) frequent exchanges of experiences, ideas, technicaL knowledge, and other matters pertaining to the financial management of such programs; and 4) inclusion of applicable financial management topics in the training of clinical staffs and those involved in follow-up operations. Additionally, a proposal was made that national population organizations or committees develop research and evaluation units. Workshop discussion sessions focused on financial planning and management, accounting and disbursement of funds, use and control of foreign aid, cost of effectiveness and benefit analysis, and financial reporting. PMID:12309355

  5. 76 FR 7098 - Dealer Floor Plan Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-09

    ... ADMINISTRATION 13 CFR Parts 120 and 121 Dealer Floor Plan Pilot Program AGENCY: U.S. Small Business... Dealer Floor Plan Pilot Program to make available 7(a) loan guaranties for lines of credit that provide floor plan financing. This new Dealer Floor Plan Pilot Program was created in the Small Business...

  6. Arctic contaminants research program: Research plan

    SciTech Connect

    Landers, D.H.; Ford, J.; Allen, S.; Curtis, L.; Omernik, J.M.

    1992-12-01

    The research plan was initially intended to contain the information needed to evaluate the U.S. Environmental Protection Agency (EPA) Arctic Contaminant Research Program (ACRP). The scientific aspects of the proposed research form the main body of the document and focus on objectives of the specific research components, current literature, approach, and rationale. The ACRP has three major components: (1) extensive sampling of lichens, mosses, and soils to provide a spatial understanding of the status and extent of contaminants present in arctic ecosystems, (2) lake sediment research to evaluate the source and history of arctic contaminant inputs, and (3) food web research to evaluate the possible effects of atmospherically transported pollutants on arctic food webs. The research plan will be used to provide a framework for the ACRP, based on the preliminary studies done to date and will be implemented over the next five years. The Program will undergo additional peer reviews at two-year intervals in the future.

  7. Surplus Highly Enriched Uranium Disposition Program plan

    SciTech Connect

    1996-10-01

    The purpose of this document is to provide upper level guidance for the program that will downblend surplus highly enriched uranium for use as commercial nuclear reactor fuel or low-level radioactive waste. The intent of this document is to outline the overall mission and program objectives. The document is also intended to provide a general basis for integration of disposition efforts among all applicable sites. This plan provides background information, establishes the scope of disposition activities, provides an approach to the mission and objectives, identifies programmatic assumptions, defines major roles, provides summary level schedules and milestones, and addresses budget requirements.

  8. Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  9. Family planning program sustainability: threat or opportunity?

    PubMed

    Ashford, L S; Haws, J M

    1992-01-01

    This argument in favor of moving toward self-sufficiency in family planning suggests that programs can achieve by improving efficiency, generating income, and providing quality services. Philip Harvey in a 1991 article, offered persuasive arguments against moving toward self-sufficiency in family planning. He contends that self-sufficiency emphasizes income generation to the detriment of social objectives and reverses priorities to first serve those consumers within easy reach. Harvey's contention is countered by the following: 1) already favoring the well-off, policies of most developing countries rarely provide services to the poor. A self-sufficient program can cross-subsidize services for the poor. 2) studies have shown that even the poorest citizens are willing to pay for services they value. And 3) cost-benefit analysis has shown that family planning can have substantial economic benefits, and institutions that come to recognize these benefits will find it in their interest to pay for services. 2 issues involved in the move toward self-sufficiency are discussed: supply of funds and demand for services. As foreign assistance declines, family planning organizations will need to look to other sources for money. Money-raising strategies include persuading government and private institutions to pay for family planning services, and providing services such as sexually transmitted disease and infertility treatment for which clients are willing to pay. Grant reduction will make family planning organizations more conscious of cost-effectiveness and will increase efficiency. The importance of quality services is stressed: improved quality will attract more paying clients. PMID:1557796

  10. Savannah River Site DNAPL technical program plan

    SciTech Connect

    Jordan, J.E.; Looney, B.B.; Rossabi, J.; Bergren, C.L.

    1993-12-31

    This document was developed by the environmental remediation and technology development organizations at the Savannah River Site (SRS) and is the Site technical program plan to address the remediation of residual chlorinated hydrocarbon solvents in the groundwater and the soil. These solvents are often labeled dense nonaqueous phase liquids (DNAPLs). At SRS, the primary DNAPL constituents of concern are trichloroethylene (TCE) and tetrachloroethylene (PCE); two commonly used industrial organic solvents. The goal of the technical program plan is to provide clear objectives for DNAPL characterization and remediation activities at SRS. Developed by a task team of researchers at SRS, the objectives and program description document a coordinated, programmatic approach to identify solutions to the complex problem of DNAPL contamination. The purposes of this program are to expedite the development and application of technologies for DNAPL characterization and remediation, to provide a well characterized {open_quotes}real{close_quotes} site to perform the work, and to facilitate DNAPL remediation at SRS. Given the appropriate resources, SRS will provide an intelligent application of technical skills and confidence toward the remediation of DNAPLS. We have completed an initial characterization of DNAPLs that provides unique data on the location, nature, and extent of DNAPL occurrences at a field site. Future activities will leverage the initial characterization data for DNAPLs at SRS to demonstrate efficient progression through the characterization phase leading to cleanup. The initial characterization data provides a tool to focus this program`s activities. As a result, solutions to the complex problem of DNAPL contamination will be tested and demonstrated in the most cost-effective manner. Where appropriate, the program will rely on identifying and utilizing innovative technologies developed by industry and universities.

  11. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Annual review of system safety program plan and... SAFETY OVERSIGHT Role of the State Oversight Agency § 659.25 Annual review of system safety program plan... annual review of its system safety program plan and system security plan. (b) In the event the...

  12. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Annual review of system safety program plan and... SAFETY OVERSIGHT Role of the State Oversight Agency § 659.25 Annual review of system safety program plan... annual review of its system safety program plan and system security plan. (b) In the event the...

  13. [The challenges of the family planning program].

    PubMed

    Alarcon, F; Mojarro, O

    1991-01-01

    Mexican family planning officials used date from the 1990 population census to revise population growth estimates and determine program needs for different family planning institutions during 1990-94. Total fertility rates were used to estimate fertility, using information from sociodemographic surveys taken over the past 10 years. Total fertility rates were estimated at 3.29 in 1987, 2.8 in 1990, and projected at 2.5 in 1994. These rates correspond to a crude birth rate of 24-25/1000 in 1990 and 22-23 in 1994 and natural increase rates of 1.87% and 1.67%. In obtaining these estimates, the structure of fertility of the 1987 National Survey of Fertility and Health and the program projections of women by ages of the National Population Council and the National Institute of Statistics, Geography, and were considered. The TARGET model was used to estimate the numbers of women in union using different modern methods who would need to be served by family planning programs in order to meet the proposed total fertility rates. The prevalence of sterilization, IUDS, and oral contraceptives (OCs) in women in union would be 59% in 1990 and 62% in 1994, or in absolute terms 7.8 million women in 1990 and 9.3 million in 1994. The public sector has replaced the private as the major source of family planning services. The Mexican Institute of Social Security (IMSS) share is expected to increase from 48.3% of users in 1990 to 56.5% in 1994. The other 3 public sector institutions will maintain their current level of coverage. The private sector has played a smaller role in family planning in Mexico than in many other countries, and the state will thus have the major responsibility for service provision, including family planning education, promotion, and counseling of prospective clients. Existing services should be made more accessible as far as physical access and hours of operation, and the methods available should be increased beyond OCs and condoms. Traditional midwives in rural

  14. N Reactor Deactivation Program Plan. Revision 4

    SciTech Connect

    Walsh, J.L.

    1993-12-01

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.

  15. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    SciTech Connect

    Not Available

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  16. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POPCORN... Secretary for approval any program, plan or project authorized under this subpart. Such programs, plans...

  17. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POPCORN... Secretary for approval any program, plan or project authorized under this subpart. Such programs, plans...

  18. 7 CFR 1208.54 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....54 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE PROCESSED... program, plan, or project authorized under this subpart. Such a program, plan, or project shall...

  19. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POPCORN... Secretary for approval any program, plan or project authorized under this subpart. Such programs, plans...

  20. 7 CFR 1208.54 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....54 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE PROCESSED... program, plan, or project authorized under this subpart. Such a program, plan, or project shall...

  1. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POPCORN... Secretary for approval any program, plan or project authorized under this subpart. Such programs, plans...

  2. How Strategic Planning Keeps You Sane when Delivering Distance Programs

    ERIC Educational Resources Information Center

    MacNeil, Dixie; Luzius, Kim; Dunkin, Sonya

    2010-01-01

    This paper details the advantages of creating a strategic plan in the development and delivery of distance programs at the authors' own institution. The steps involved in the planning process and the three key elements of a successful strategic plan are addressed. The key elements include a program plan explaining the roles/responsibilities of…

  3. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  4. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  5. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State shall submit a description of its...

  6. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  7. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  8. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  9. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  10. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  11. 20 CFR 653.112 - State agency program budget plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 3 2014-04-01 2014-04-01 false State agency program budget plans. 653.112... State agency program budget plans. (a) Each State agency, in its annual program budget plan, shall... and Budget under control number 1205-0039) (Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))...

  12. 20 CFR 653.112 - State agency program budget plans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 3 2013-04-01 2013-04-01 false State agency program budget plans. 653.112... State agency program budget plans. (a) Each State agency, in its annual program budget plan, shall... and Budget under control number 1205-0039) (Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))...

  13. 20 CFR 653.112 - State agency program budget plans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false State agency program budget plans. 653.112... State agency program budget plans. (a) Each State agency, in its annual program budget plan, shall... and Budget under control number 1205-0039) (Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))...

  14. Design for Diversity: A Program Planning Grid for Student Activities.

    ERIC Educational Resources Information Center

    Kubik, Jan B.

    This guide provides a program planning grid for college student personnel workers involved in the area of student activities. A program planning and evaluative system is proposed to address campus needs and allow greater control in planning an educationally balanced program. This system is based on an outline of topical areas to be addressed…

  15. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State shall submit a description of its...

  16. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Program management and administration plan. 225.4... Provisions § 225.4 Program management and administration plan. (a) Not later than February 15 of each year, each State agency shall submit to FNSRO a Program management and administration plan for that...

  17. Radiological Assistance Program Flight Planning Tool

    SciTech Connect

    Messick, C.; Pham, M.; Ridgeway, J.; Smith, R.

    2011-12-19

    The Radiological Assitance Program (RAP) is the National Nuclear Security Administration's (NNSA) first responder to radiological emergencies. RAP's mission is to identify and minimize radiological hazards, as well as provide radiological emergency response and technical advice to decision makers. One tool commonly used is aerial radiation detection equipment. During a response getting this equipment in the right place quickly is critical. The RAP Flight Planning Tool (a ArcGIS 10 Desktop addin) helps minimize this response time and provides specific customizable flight path information to the flight staff including maps, coordinates, and azimuths.

  18. Planning aquatic ecosystem restoration monitoring programs

    SciTech Connect

    Thom, R.M.; Wellman, K.F.

    1997-01-01

    This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

  19. Mixed Waste Focus Area program management plan

    SciTech Connect

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

  20. Radiological Assistance Program Flight Planning Tool

    Energy Science and Technology Software Center (ESTSC)

    2011-12-19

    The Radiological Assitance Program (RAP) is the National Nuclear Security Administration's (NNSA) first responder to radiological emergencies. RAP's mission is to identify and minimize radiological hazards, as well as provide radiological emergency response and technical advice to decision makers. One tool commonly used is aerial radiation detection equipment. During a response getting this equipment in the right place quickly is critical. The RAP Flight Planning Tool (a ArcGIS 10 Desktop addin) helps minimize this responsemore » time and provides specific customizable flight path information to the flight staff including maps, coordinates, and azimuths.« less

  1. Standard Review Plan Update and Development Program

    SciTech Connect

    Not Available

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  2. MHD (Magnetohydrodynamics) Program Plan, FY 1989

    NASA Astrophysics Data System (ADS)

    1989-05-01

    The essential elements of the current program, which is a continuation of the program outlined in the FY 1988 MHD Program Plan, are to: develop technical and environmental data for the integrated MHD topping cycle system through long-term (1000 hours) proof of concept (POC) testing; develop technical and environmental data for the integrated MHD bottoming cycle subsystem through long-term (4000 hours) POC testing; design and construct a seed regeneration system capable of independent operation, using spent seed materials from the MHD process; prepare a conceptual design for an MHD retrofit plant; and continue system studies and supporting research necessary for system testing. Results of the topping cycle POC tests at the Component Development and Integration Facility (CDIF), coupled with the bottoming cycle POC test results obtained at the Coal Fired Flow Facility (CFFF), and the seed regeneration POC effort will provide the critical engineering data base for the private sector's final decision on proceeding with the design, construction, and operation of an MHD retrofit. The development schedule, decision points, and resource requirements are discussed. As part of the MHD program, international activities of several nations are monitored and evaluated through contact with the international MHD scientific and technical community.

  3. Evaluation plan for the Weatherization Assistance Program

    SciTech Connect

    Beschen, D.A. ); Brown, M.A. )

    1991-08-01

    The most recent national evaluation of the impacts of the US Department of Energy (DOE)'s Weatherization Assistance Program (WAP) was completed in 1984 based on consumption data for households weatherized in 1981. WAP regulations and operations have changed substantially over the last decade, and new opportunities are on the horizon. DOE recognizes the need for a more current national level evaluation of the program and has developed a plan for conducting the evaluation with the support of the Oak Ridge National Laboratory (ORNL). The national WAP evaluation as currently proposed has seven major goals: (1) estimate the energy saved by the program -- one, two, and three years after participation; (2) assess nonenergy impacts, such as comfort, safety, and housing affordability; (3) assess program cost effectiveness; (4) analyze factors which influence energy savings, nonenergy impacts, and cost effectiveness; (5) describe the WAP network's capabilities and the innovative weatherization technologies and procedures it has employed; (6) characterize the WAP-eligible population and the federal and non-federal funds that haven been used to meet its weatherization needs; and, (7) identify promising WAP opportunities for the future. The data collection, analyses, and reports are to be completed in phases between 1991 and 1993. The evaluation methodologies vary by fuel type, housing type, and climate zone. The analysis of energy savings and cost effectiveness will be based primarily on weather-normalized, retrospective utility billing records (collected for pre- and postretrofit years). 12 refs., 8 figs.

  4. Transmission network planning using linear programming

    SciTech Connect

    Villasana, R.; Garver, L.L.; Salon, S.J.

    1985-02-01

    In long range transmission planning, where new load growth, new generation sites and perhaps a new voltage level are to be considered, a computer aided method of visualizing new circuits in a network context is needed. The new method presented meets this need by the combined use of a linear (dc) power flow transmission model and a transportation model (also known as a trans-shipment model). The dc transmission model is solved for the facilities network by obeying both of Kirchhoff's laws, flow conservation at each bus and voltage conservation around each loop. The transportation model is solved for the overloads by obeying only the bus flow conservation law while minimizing a cost objective function. The linear programming solution of the two models together identifies where capacity shortages exist, where to add new circuits, and how much new capacity is needed. A standard linear programming computer package is used to solve the two model formulation. The overload network model is only a mathematical assistance in selecting new lines and is completely unused when the network design is complete and contains no overloads. An application of the model to the horizon-year planning of a six bus network serves to illustrate the method.

  5. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group...

  6. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group...

  7. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group...

  8. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group...

  9. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group...

  10. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency Provisions § 225.4 Program management and administration plan. (a) Not later than February 15 of each year... 7 Agriculture 4 2014-01-01 2014-01-01 false Program management and administration plan....

  11. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency Provisions § 225.4 Program management and administration plan. (a) Not later than February 15 of each year... 7 Agriculture 4 2012-01-01 2012-01-01 false Program management and administration plan....

  12. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency Provisions § 225.4 Program management and administration plan. (a) Not later than February 15 of each year... 7 Agriculture 4 2011-01-01 2011-01-01 false Program management and administration plan....

  13. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency Provisions § 225.4 Program management and administration plan. (a) Not later than February 15 of each year... 7 Agriculture 4 2013-01-01 2013-01-01 false Program management and administration plan....

  14. Environmental Restoration Quality Program Plan. Environmental Restoration Program

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  15. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    SciTech Connect

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

  16. Maglev program test plan. Final report

    SciTech Connect

    deBenedet, D.; Gilchrist, A.J.; Karanian, L.A.

    1992-07-01

    Maglev systems represent a promising evolution in the high-speed ground transportation, offering speeds in excess of 300 mph along with the potential for low operating costs and minimal environmental impact. The goal of this effort is to investigate the feasibility and viability of maglev systems in the United States. The emergence of a sophisticated technology such as maglev requires a need for a coordinated research test program and the determination of test requirements to identify and mitigate development risk and to maximize the use of domestic resources. The study is directed toward the identification and characterization of maglev systems development risks tied to a preliminary system architecture. Research objectives are accomplished by surveying experiences from previous maglev development programs, both foreign and domestic, and interviews with individuals involved with maglev research and testing. Findings include ninety-four distinct development risks and twenty risk types. Planning and implementation requirements are identified for a maglev test program, including the development of a facilities strategy to meet any operational concepts that evolve out of early development effort. Also specified is the logical development flow and associated long-lead support needs for sub-scale and full-scale testing.

  17. US RERTR Program: overview, status and plans

    SciTech Connect

    Travelli, A.

    1984-01-01

    The status of the Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a brief review of the accomplishments which the RERTR Program, in cooperation with its many international partners, had achieved by the end of 1983 in the area of LEU research reactor fuels development and application, emphasis is placed on the RERTR Program developments which took place during 1984 and on current plans and schedules. The RERTR progress in 1984 has been significant, with solid accomplishments and few surprises. Most LEU U/sub 3/Si/sub 2/-Al irradiation tests with 4.8 g U/cm/sup 3/ have been successfully completed, and contract negotiations are under way for the procurement of a whole-core demonstration of this fuel in the ORR. The demonstration is to begin in mid-1985 and to last for approximately eighteen months. Qualification of U/sub 3/Si/sub 2/-Al fuel with 7 g U/cm/sup 3/ is scheduled for 1989. International cooperation among fuel developers, commercial vendors, and reactor operators has been essential to the progress which has been achieved. With continued international cooperation, it will be feasible to significantly reduce HEU usage in research reactors in the next few years.

  18. Family planning program: world review 1974. Introduction.

    PubMed

    Watson, W B; Lapham, R J

    1975-08-01

    The 1974 Population Conference at Bucharest was marked with controversy between developed and developing countries, with the latter strongly critical of aid for population control but less for social and economic development. The Plan of Action which was finally approved emphasized the importance of social and economic factors in relation to population growth while recommending that couples in all nations should have access to family planning information. Different regions of the world, however, have widely divergent population policies and goals. The Asia-Pacific region of the developing world, which has 3/4 of the population of the developing world, has articulated a strong stance in favor of reducing birth rates at Post-Bucharest Consultation. Government-supported family planning programs are seen as a high priority item to reduce rapid population growth. Rapid population growth is not seen as a high-priority problem in most African, Arab, and Latin American countries. Population problems will be solved with economic and social advancement. There is more concern in Latin America for family planning as a "human right" issue than to promote demographic goals. Latin America was also concerned with migration/urbanization issues. All of the Regional Consultations after Bucharest favored a greater emphasis on population in development planning, concern for the problems caused by migration and urbanization, improvement in the status of women, and support for the reduction of mortality levels. Some 74 countries containing 93% of the population of the developing world, supported family planning, with only 4 populous countries -- Burma, Ethiopia, Peru, and North Korea not in support. More than 98% of the population of Asia lives in countries which support family planning; the figures are 94% for Latin America, 90% for the Middle East and North Africa and 64% for Sub-Saharan Africa. The governments of 39 countries with a combined population of 2.3 billion have stated that

  19. 75 FR 70061 - Dealer Floor Plan Pilot Program Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business Administration (SBA). ACTION... agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in the Small Business Jobs Act of 2010. The meeting will be open to the public. DATES: The Dealer Floor Plan Pilot...

  20. The NIF Ignition Program: Progress And Planning

    SciTech Connect

    Hammel, B A

    2006-06-12

    The first experimental campaign for ignition, beginning in 2010 after NIF construction and commissioning are completed, will include experiments to measure and optimize key laser and target conditions necessary for ignition. These ''tuning campaigns'' will precede the first ignition shots. Ignition requires acceptable target performance in several key areas: Energetics, Symmetry, Shock timing, and Capsule Hydrodynamics. Detailed planning and simulations for ''tuning campaigns'' in each of these areas is currently underway, as part of the National Ignition Campaign (NIC) Program. Tuning and diagnostic methods are being developed and tested on present facilities, including the Omega laser at the Laboratory for Energetics (LLE), the Z facility at Sandia National Laboratories (SNL), and the Trident laser at Los Alamos National Laboratory (LANL).

  1. Robot trajectory planning via dynamic programming

    SciTech Connect

    Dohrmann, C.R.; Robinett, R.D.

    1994-03-01

    The method of dynamic programming is applied to three example problems dealing with robot trajectory planning. The first two examples involve end-effector tracking of a straight line with rest-to-rest motions of planar two-link and three-link rigid robots. These examples illustrate the usefulness of the method for producing smooth trajectories either in the presence or absence of joint redundancies. The last example demonstrates the use of the method for rest-to-rest maneuvers of a single-link manipulator with a flexible payload. Simulation results for this example display interesting symmetries that are characteristic of such maneuvers. Details concerning the implementation and computational aspects of the method are discussed.

  2. The transition to sustainable family planning programs.

    PubMed

    1993-05-01

    USAID, through the matching grant project, provided International Planned Parenthood Federation's Western Hemisphere Region (IPPF/WHR) funds to increase and strengthen family planning (FP) services in Latin America. Family planning associations (FPAs) were to match any USAID-awarded funds with other funds, supporting efforts to promote sustainability of service delivery. The matching grant was an extremely effective and efficient means to expand access to good quality, voluntary FP services to low income, underserved people. Local income funded about 33% of Matching Grant FPA budgets. USAID and IPPF or other donors shared the other 66%. The Matching Grant FPAs reached the original target of 2.8 million new acceptors. The project was so successful that USAID awarded IPPF/WHR a new 5-year (1992-97) Transition Project. In Latin America and the Caribbean, its goals are to increase people's freedom to choose the number and spacing of their children and to promote a population growth rate appropriate to each country's socioeconomic development goals by helping some FPAs to become sustainable without USAID funding. Strengthening the institutional capacity of FP programs and evaluation of their performance and impact are 2 ways to achieve these goals. BEMFAM/Brazil, PROFAMILIA/Colombia, MEXFAM/Mexico, INPPARES/Peru, APROFA/Chile, CEPEP/Paraguay, AUPFIRH/Uruguay, FPATT/Trinidad and Tobago, PLAFAM/Venezuela, and BFLA/Belize have received matching subcontracts for FP service delivery and sustainability. IPPF/WHR considers Brazil, Colombia, Peru, and Mexico to be high-priority countries, largely because they have more than 60% of the population of Latin America. About 81% of Transition Project funds will go to in-country sub-grants and on regional activities, matched on a 1-to-1 basis. 86% of subcontracts will go to Colombia, Mexico, and Peru. Technical assistance and funding are also targeted to HIV/AIDS and sexually transmitted disease prevention. PMID:12179841

  3. Solar index generation and delivery. Program plan

    SciTech Connect

    Lantz, L J

    1980-02-01

    The Solar Index, or, more completely defined as the Service Hot Water Solar Index, was conceptualized during the spring of 1978 with direction from a US Government interoffice agency committee, headed by the Department of Energy. The purpose was to enhance public awareness to solar energy usability. Basically, the Solar Index represents the percentage of energy that solar would provide in order to heat an 80 gallon service hot water load for a given location and day. The Index is computer by utilizing SOLCOST, a computer program, which also has applications to space heating, cooling, and heat pump systems and which supplies economic analyses for such solar energy systems. The Index is generated for approximately 75 geographic locations in the country on a daily basis. The definition of the Index, how the project came to be, what it is at the present time and a plan for the future are described. Also presented are the models used for the generation of the Index, a discussion of the primary tool of implementation (the SOLCOST program) and future efforts.

  4. Tactical aircraft optical cable plant program plan

    NASA Astrophysics Data System (ADS)

    Weaver, Thomas L.; Murdock, John K.; Ide, James R.

    1995-05-01

    A program was created with joint industry and government funding to apply fiber optic technologies to tactical aircraft. The technology offers many potential benefits, including increased electromagnetic interference immunity and the possibility of reduced weight, increased reliability, and enlarged capability from redesigning architectures to use the large bandwidth of fiber optics. Those benefits will only be realized if fiber optics meets the unique requirements of aircraft networks. The application of fiber optics to tactical aircraft presents challenges to physical components which can only be met by a methodical attention to what is required, what are the conditions of use, and how will the components be produced in the broad context of a fiber optics using economy. For this purpose, the FLASH program has outlined a plan, and developed a team to evaluate requirements, delineate environmental and use conditions, and design practical, low cost components for tactical aircraft fiber optic cable plants including cables, connectors, splices, backplanes, manufacturing and installation methods, and test and maintenance methods.

  5. Program Planning in Two-Year Colleges: A Handbook.

    ERIC Educational Resources Information Center

    Posner, George; And Others

    Part I of this document describes a model for occupational program planning in two-year colleges. The planning process begins with an estimation decision, i.e., whether the program idea is worth investigating. This decision can be divided into seven sub-questions or systems: (1) Identity--what should be the general content of the program? (2)…

  6. DOE Hydrogen and Fuel Cells Program Plan (September 2011)

    SciTech Connect

    none,

    2011-09-01

    The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Program and the DOE offices of Nuclear Energy, Fossil Energy, and Science.

  7. Site support program plan for ICF Kaiser Hanford Company

    SciTech Connect

    Dieterle, S.E.

    1996-09-27

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  8. FY97 Geothermal R&D Program Plan

    SciTech Connect

    1996-09-01

    This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

  9. Quality assurance program plan for radionuclide airborne emissions monitoring

    SciTech Connect

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements.

  10. 45 CFR 1355.35 - Program improvement plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... included in the annual reviews and progress reports related to the CFSP required in 45 CFR 1357.16. ... MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL § 1355.35 Program improvement... conformity shall develop a program improvement plan. The program improvement plan must: (i) Be...

  11. Establishing Apprenticeship Programs for Youth Workers: A Planning Guide

    ERIC Educational Resources Information Center

    Dawson, Amy L.

    2004-01-01

    This planning guide describes the BEST Youth Development Practitioner Apprenticeship Program, provides perspectives on the benefits of apprenticeship and other considerations for community stakeholders, and offers guidance on planning milestones and activities needed to accomplish Youth Development Practitioner Apprenticeships through…

  12. Review of NASA's Planned Mars Program

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The exploration of Mars has long been a prime scientific objective of the U.S. planetary exploration program. Yet no U.S. spacecraft has successfully made measurements at Mars since the Viking missions of the late 1970s. Mars Observer, which was designed to conduct global observations from orbit, failed just before orbit insertion in 1993. The Russian spacecraft Phobos 2 did succeed in making some observations of the planet in 1989, but it was designed primarily to observe Phobos, the innermost satellite of Mars; the spacecraft failed 2 months after insertion into Mars orbit during the complex maneuvers required to rendezvous with the martian satellite. In fall 1996 NASA plans to launch Mars Pathfinder for a landing on the martian surface in mid-1997. This spacecraft is one of the first two missions in NASA's Discovery program that inaugurates a new style of planetary exploration in which missions are low-cost (less than $150 million) and have very focused science objectives. As can be seen in the comparative data presented in Box 1, this mission is considerably smaller in terms of cost, mass, and scope than NASA's previous Mars missions. NASA's FY 1995 budget initiated a continuing Mars exploration program, called Mars Surveyor, that involves multiple launches of spacecraft as small as or smaller than Mars Pathfinder to Mars over the next several launch opportunities, which recur roughly every 26 months. The first mission in the program, Mars Global Surveyor, set for launch late in 1996, is intended to accomplish many of the objectives of the failed Mars Observer. Like the Discovery program, Mars Surveyor is a continuing series of low-cost missions, each of which has highly focused science objectives. See Box 1 for comparative details of those Surveyor missions currently defined. Around the same time that the Mars Surveyor series was chosen as the centerpiece of NASA's solar system exploration program, the Committee on Planetary and Lunar Exploration (COMPLEX

  13. Planning for Life: Developing and Recognizing Exemplary Career Planning Programs. A Resource Guide for Counselors.

    ERIC Educational Resources Information Center

    Dahir, Carol, Ed.

    Recognizing the importance of the need for effective career planning, the United States Army, in conjunction with the Council of Economic Development, conducted a forum to focus on this issue. What emerged was a program called Planning for Life, which annually recognizes outstanding career planning programs at the state and national level. The…

  14. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  15. Quality Assurance Program Plan for FFTF effluent controls. Revision 1

    SciTech Connect

    Seamans, J.A.

    1995-06-08

    This Quality Assurance Program Plan is specific to environmental related activities within the FFTF Property Protected Area. The activities include effluent monitoring and Low Level Waste Certification.

  16. Reducing discontinuation in family planning programs.

    PubMed

    Roberts, D; Panitchpakdi, P; Loevinsohn, B

    1993-01-01

    Management strategies for reducing discontinuation in family planning programs are summarized; the strategies are practical and show how to analyze data for women who stop using contraception. Common factors that are associated with high levels of discontinuation are identified. Recommendations are made for how program managers can change service delivery in order to improve client continuation. Understanding the size and nature of discontinuation is an important precursor to a solution. Data collection on discontinuation could be combined with a system for tracking and follow-up of individual clients. The reasons that women stop using contraception are identified as those which clinics can or cannot control. A clinic discontinues is one who is a "no show" within a reasonable period of time. Decisions need to be made about the type of discontinues to be tracked, e.g. all new acceptors or pill users only. How to identify no shows, how to use the daily register tracking system, and how to calculate discontinuation rates are described. A special daily record tracking system can be used to track clients over years and does not replace the client medical and reproductive history record. The advantages are that client forms to not have to be redesigned and staff training is simple. The disadvantages apply to large clinics and the need for ample filing areas and proper management. An example is given of a working solution in Kenya for a community-based distribution program. Discontinuation rates may be calculated in various ways; a more exact measure tends to be the most useful. Recalculating discontinuation rates at regular intervals can provide an effective way to check standards of care. A tally sheet can be used to track characteristics of discontinues; a sample is given and analyzed to show interpretations which point the way to program changes. Comparisons may be made by age, method type, length of use. An example is given of the Rwanda service delivery system and

  17. U.S. Department of Education FY 1999 Annual Plan, Volume 2: Program Performance Plans.

    ERIC Educational Resources Information Center

    Department of Education, Washington, DC.

    The Government Performance and Results Act of 1993 called for the U.S. Department of Education to prepare an Annual Performance Plan which links the Department's budget request with its Strategic Plan. To meet that directive, Volume 2 of the Department's Strategic Plan for 1999 is presented here. It includes the program performance plans that…

  18. Planning for Life. A Compendium of Nationally Recognized Career Planning Programs.

    ERIC Educational Resources Information Center

    National Consortium of State Career Guidance Supervisors, Columbus, OH.

    This compendium, which is designed to provide readers with a variety of career planning (CP) program ideas, contains abstracts summarizing 10 elementary, middle, and high school CP programs identified as exemplary by a national review team. Explained in chapter 1 are the primary objectives of the Planning for Life program, which is jointly…

  19. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  20. Study Abroad Programs in Business: Planning, Organizing, and Marketing.

    ERIC Educational Resources Information Center

    Tashakori, Ahmad; Dotson, Michael

    1989-01-01

    Focuses on study abroad programs as a means of increasing the intercultural understanding of U.S. business students. Offers guidelines for planning, organizing, and marketing such programs. (Author/JOW)

  1. The SETI program plan and instrument development status

    NASA Technical Reports Server (NTRS)

    Berman, A. L.; Crow, R. B.

    1981-01-01

    The primary thrust of the SETI (Search for Extraterrestrial Intelligence) Program is to search the microwave region of the spectrum for signals of extraterrestrial intelligent origin. The SETI program plan and current SETI breadboard instrument development activities are described.

  2. QA program plan plutonium stabilization and handling project W-460

    SciTech Connect

    SCHULTZ, J.W.

    1999-09-02

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

  3. NASA Year 2000 (Y2K) Program Plan

    NASA Technical Reports Server (NTRS)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  4. Planning, Programing, and Administration of Functional Literacy.

    ERIC Educational Resources Information Center

    Bhola, H. S.

    The document was prepared as part of a UNESCO contract to train 16 counterpart officials of UNESCO-sponsored literacy projects. Functional literacy was studied in three parts, all dealing with the total planning process. First was project planning. Literacy projects must consider national educational plans and be related to relevant economic…

  5. Well-planning programs give students field-like experience

    SciTech Connect

    Sifferman, T.R.; Chapman, L.

    1983-01-01

    The University of Tulsa recently was given a package of computer well planning and drilling programs that will enable petroleum engineering students to gain valuable experience in designing well programs while still in school. Comprehensive homework assignments are now given in areas of drilling fluids programing, hydraulics, directional wells and surveying. Additional programs are scheduled for next semester.

  6. Planning Programs for Infants: State Series Paper (Number 2).

    ERIC Educational Resources Information Center

    Woodruff, Geneva; And Others

    Planning for infant intervention programs is the focus of the booklet. The approach rests on key principles, including family support, interagency cooperation, and individualization of early intervention services. Questions are raised for consideration in six topic areas: (1) planning (structure of planning process); (2) funding (legislative…

  7. Bilingual Crosscultural Programs: A Plan for Community Colleges.

    ERIC Educational Resources Information Center

    Petersen, Allan; Cepeda, Rita

    This report presents the California Community Colleges (CCC) Plan for Bilingual Crosscultural Programs and explains the background and context of the plan's development. First, the report provides a summary of the history of the proposed plan; an overview of relevant federal and state legislation concerned with bilingual education; and the…

  8. 30 CFR 75.161 - Plans for training programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 75.161 Section 75.161 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Qualified and Certified Persons § 75.161 Plans for training programs. Each operator...

  9. Developing a Program Evaluation Plan: Options and Opportunities.

    PubMed

    Lubejko, Barbara G

    2016-09-01

    Planning how to evaluate educational programs needs to be a thoughtful process that begins early in program planning. By considering a series of questions and choosing between direct and indirect outcome measures, the evaluation process can provide useful data about successes and opportunities. J Contin Educ Nurs. 2016;47(9):388-389. PMID:27580502

  10. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Planning programs affecting land use. 9.15 Section 9.15 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning programs affecting land use. The Agency...

  11. Highway Safety Program Manual: Volume O: Planning and Administration.

    ERIC Educational Resources Information Center

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    As the introductory volume to the 19-volume Highway Safety Program Manual (which provides guidance to State and local governments on preferred highway safety practices), the document concentrates on aspects of planning and administration of a statewide highway safety program. Topics discussed are: the purpose of planning and administration,…

  12. Operational Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect

    Perkins, C.J.

    1994-08-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and operational environmental monitoring performed by Westinghouse Hanford Company as it implements the Operational Environmental Monitoring program. This plan applies to all sampling and monitoring activities performed by Westinghouse Hanford Company in implementing the Operational Environmental Monitoring program at the Hanford Site.

  13. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Updated program plans and budgets. 603.885 Section 603.885... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision... effort and a revised budget if there is a significant change from the initial budget....

  14. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Updated program plans and budgets. 603.885 Section 603.885... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision... effort and a revised budget if there is a significant change from the initial budget....

  15. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Updated program plans and budgets. 603.885 Section 603.885... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision... effort and a revised budget if there is a significant change from the initial budget....

  16. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Updated program plans and budgets. 603.885 Section 603.885... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision... effort and a revised budget if there is a significant change from the initial budget....

  17. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Updated program plans and budgets. 603.885 Section 603.885... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision... effort and a revised budget if there is a significant change from the initial budget....

  18. Program Planning: The Neglected Dimension of Service-Learning

    ERIC Educational Resources Information Center

    Sandmann, Lorilee R.; Kiely, Richard C.; Grenier, Robin S.

    2009-01-01

    While service-learning has distinguished itself in the literature as a problem-based experiential alternative to dominant classroom-based, subject-centered pedagogies, there is a strange absence of research based on program planning theory. This work introduces program planning theory to the field of service-learning and reports findings from a…

  19. 30 CFR 75.161 - Plans for training programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Plans for training programs. 75.161 Section 75.161 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Qualified and Certified Persons § 75.161 Plans for training programs. Each operator...

  20. 30 CFR 75.161 - Plans for training programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Plans for training programs. 75.161 Section 75.161 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Qualified and Certified Persons § 75.161 Plans for training programs. Each operator...

  1. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 1 2012-01-01 2012-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and...

  2. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 1 2014-01-01 2014-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and...

  3. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty jurisdictions are encouraged to adopt...

  4. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and...

  5. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and...

  6. 49 CFR 236.905 - Railroad Safety Program Plan (RSPP).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad Safety Program Plan (RSPP). 236.905 Section 236.905 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... for Processor-Based Signal and Train Control Systems § 236.905 Railroad Safety Program Plan (RSPP)....

  7. 49 CFR 236.905 - Railroad Safety Program Plan (RSPP).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad Safety Program Plan (RSPP). 236.905 Section 236.905 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... for Processor-Based Signal and Train Control Systems § 236.905 Railroad Safety Program Plan (RSPP)....

  8. 49 CFR 236.905 - Railroad Safety Program Plan (RSPP).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad Safety Program Plan (RSPP). 236.905 Section 236.905 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... for Processor-Based Signal and Train Control Systems § 236.905 Railroad Safety Program Plan (RSPP)....

  9. 49 CFR 236.905 - Railroad Safety Program Plan (RSPP).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad Safety Program Plan (RSPP). 236.905 Section 236.905 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... for Processor-Based Signal and Train Control Systems § 236.905 Railroad Safety Program Plan (RSPP)....

  10. Developmental Training Program: Individual Educational Plan/Individual Transitional Plan.

    ERIC Educational Resources Information Center

    Educational Service Unit #9, Hastings, NE.

    The curriculum model and implementation procedures outlined in this manual for the Developmental Training Program for students with disabilities are based on two trends: the emphasis upon teaching functional skills in the natural environment and the need for educational programs which demonstrate measurability, reportability, and accountability.…

  11. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect

    George Griffith; Robert Youngblood; Jeremy Busby; Bruce Hallbert; Cathy Barnard; Kathryn McCarthy

    2012-01-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

  12. The NASA Space Station program plans

    NASA Technical Reports Server (NTRS)

    Freitag, R. F.

    1984-01-01

    The design of a permanently manned space station is discussed. The role of the space shuttle, planning guidelines, international cooperation, and commercial possibilities are among the topics discussed.

  13. The NASA Space Station program plans

    NASA Technical Reports Server (NTRS)

    Freitag, R. F.

    1985-01-01

    The design of a permanently manned Space Station is discussed. The role of the Space Shuttle, planning guidelines, international cooperation, and commercial possibilities are among the topics discussed.

  14. National Civil Applications Program: strategic plan vision for 2005

    USGS Publications Warehouse

    U.S. Geological Survey

    2004-01-01

    The National Mapping Division (NMD) has developed this comprehensive strategic plan to chart the course of the National Civil Applications Program (NCAP) over the next 5 years. To meet the challenges of the future, the NCAP is changing its program emphases, methods of responding to customer needs, and business practices. The NCAP Strategic Plan identifies the new direction for the program through a series of strategic thrusts and goals for managers to use in formulating plans, establishing program emphases, and determining resource needs and allocations.

  15. Active Sites Environmental Monitoring Program: Program plan. Revision 1

    SciTech Connect

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1992-02-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of transuranic (TRU) waste and active low-level waste (LLW) facilities at Oak Ridge National Laboratory (ORNL) in accordance with US Department of Energy (DOE) Order 5820.2A. Active LLW facilities in Solid Waste Storage Area (SWSA) 6 include Tumulus I and Tumulus II, the Interim Waste Management Facility (IWMF), LLW silos, high-range wells, asbestos silos, and fissile wells. The tumulus pads and IWMF are aboveground, high-strength concrete pads on which concrete vaults containing metal boxes of LLW are placed; the void space between the boxes and vaults is filled with grout. Eventually, these pads and vaults will be covered by an engineered multilayered cap. All other LLW facilities in SWSA 6 are below ground. In addition, this plan includes monitoring of the Hillcut Disposal Test Facility (HDTF) in SWSA 6, even though this facility was completed prior to the data of the DOE order. In SWSA 5 North, the TRU facilities include below-grade engineered caves, high-range wells, and unlined trenches. All samples from SWSA 6 are screened for alpha and beta activity, counted for gamma-emitting isotopes, and analyzed for tritium. In addition to these analytes, samples from SWSA 5 North are analyzed for specific transuranic elements.

  16. Strategies for Manpower Planning and Programming.

    ERIC Educational Resources Information Center

    Burack, Elmer H.

    The book is concerned with optimum manpower utilization in the private and public sectors and examines a variety of types of organizations. In this guide to structured manpower planning, contents include management and manpower in an era of change; a model of the overall manpower planning and implementation process; case material on technological…

  17. Sandia wind program FY94 annual operating plan

    SciTech Connect

    Dodd, H.M.

    1993-10-01

    This document presents the objectives, accomplishments and activity plan for the Sandia Wind Energy Technology Program. The status of the current program is summarized and the planned FY94 activities are defined. Appendices detailing the cost, performance and schedule associated with these activities are also included. Funding requirements are given for several scenarios in order to reflect the impact of funding variability on program progress.

  18. Program Plan: field radionuclide migration studies in Climax granite

    SciTech Connect

    Isherwood, D.; Raber, E.; Coles, D.; Stone, R.

    1980-11-01

    This Program Plan describes the field radionuclide migration studies we plan to conduct in the Climax granite at the Nevada Test Site. Laboratory support studies are included to help us understand the geochemical and hydrologic processes involved in the field. The Program Plan begins with background information (Section 1) on how this program fits into the National Waste Terminal Storage Program Plan and discusses the needs for field studies of this type. The objectives stated in Section 2 are in direct response to these needs, particularly the need to determine whether laboratory studies accurately reflect actual field conditions and the need for field testing to provide a data base for verification of hydrologic and mass transport models. The technical scope (Section 3) provides a work breakdown structure that integrates the various activities and establishes a base for the technical approach described in Section 4. Our approach combines an interactive system of field and laboratory migration experiments with the use of hydrologic models for pre-test predictions and data interpretation. Section 5 on program interfaces identifies how information will be transferred to other related DOE projects. A schedule of activities and major milestones (Section 6) and the budget necessary to meet the project objectives (Section 7) are included in the Program Plan. Sections 8 and 9 contain brief descriptions of how the technical and program controls will be established and maintained and an outline of our quality assurance program. This program plan is an initial planning document and provides a general description of activities. An Engineering Test Plan containing detailed experimental test plans, an instrumentation plan and equipment design drawings will be published as a separate document.

  19. Review of NASA's Planned Mars Program

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Contents include the following: Executive Summary; Introduction; Scientific Goals for the Exploration of Mars; Overview of Mars Surveyor and Others Mars Missions; Key Issues for NASA's Mars Exploration Program; and Assessment of the Scientific Potential of NASA's Mars Exploration Program.

  20. Computer Applications Planning. A Guide to Planning and Implementing a District-Wide Computer Program.

    ERIC Educational Resources Information Center

    Mojkowski, Charles

    Designed to help school districts move from exploring the use of computers in the classroom to the comprehensive planning and development of computer education programs, this guide is organized around five steps essential to the process of developing a district program. Phase 1 includes the following preliminary activities involved in planning for…

  1. HTGR generic technology program plan (FY 80)

    SciTech Connect

    Not Available

    1980-01-01

    Purpose of the program is to develop base technology and to perform design and development common to the HTGR Steam Cycle, Gas Turbine, and Process Heat Plants. The generic technology program breaks into the base technology, generic component, pebble-bed study, technology transfer, and fresh fuel programs. (DLC)

  2. Planning Evaluation through the Program Life Cycle

    ERIC Educational Resources Information Center

    Scheirer, Mary Ann; Mark, Melvin M.; Brooks, Ariana; Grob, George F.; Chapel, Thomas J.; Geisz, Mary; McKaughan, Molly; Leviton, Laura

    2012-01-01

    Linking evaluation methods to the several phases of a program's life cycle can provide evaluation planners and funders with guidance about what types of evaluation are most appropriate over the trajectory of social and educational programs and other interventions. If methods are matched to the needs of program phases, evaluation can and should…

  3. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect

    Kathryn McCarthy; Jeremy Busby; Bruce Hallbert; Shannon Bragg-Sitton; Curtis Smith; Cathy Barnard

    2013-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

  4. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect

    McCarthy, Kathryn A.; Busby, Jeremy; Hallbert, Bruce; Bragg-Sitton, Shannon; Smith, Curtis; Barnard, Cathy

    2014-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

  5. Developing a Chapter 1 Program Improvement Plan: A Guide.

    ERIC Educational Resources Information Center

    Thompson, Linda W.

    A new Chapter 1 law, P.L. 100-297, was passed in 1988. Chapter 1 schools must examine the program operated during the previous school year. Schools that fail to demonstrate overall achievement gains must develop a Program Improvement Plan (PIP), a document describing how the Chapter 1 program in that school will be modified. This guide provides a…

  6. Program Planning for Research Libraries in a University Setting.

    ERIC Educational Resources Information Center

    Mason, Thomas R.

    The Planning-Programing-Budgeting System (PPBS) uses techniques of systems analysis, cost-benefit analysis, and program budgeting in the administration of large, complex organizations. Some university administrators hope to improve their institutions' internal management through the PPBS approach. The basic program categories of the university are…

  7. Solar Terrestrial programs: A five year plan

    NASA Technical Reports Server (NTRS)

    Stern, D. P.

    1978-01-01

    Major projects to be initiated in the 1980-1985 period, designed to study the Sun, the heliosphere, Earth's magnetosphere, and the upper atmosphere involve the use of spacelab as well as free flying spacecraft. Current and recent investigations in these areas are reviewed and the guiding principles followed in planning future missions are examined. The implementation strategy, the planning process, and supporting research and technology are discussed.

  8. Culture and the management of family planning programs.

    PubMed

    Warwick, D P

    1988-01-01

    Integrating family planning programs with local cultures can increase or undermine their effectiveness. Program design and organization will be influenced by kinship and reproductive decision-making, which varies across regions, racial and communal divisions, and religions. Program implementation depends on four aspects of culture: (1) the understanding, acceptance, and continued practice of family planning by clients; (2) the climate in the organizations responsible for fieldwork, which affects the disposition to work and the tasks to be done; (3) the ability and willingness of field implementers to do their work; and (4) the communities in which clients live, including collective attitudes toward family planning and local pressures put on clients to participate. The Indonesian family planning program is a case in which these elements of culture are often positive. Other programs, such as that in Kenya, have a more negative environment for action. PMID:3284022

  9. Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

    NASA Technical Reports Server (NTRS)

    Smith, Janice F. (Compiler); Forrest, Larry

    1993-01-01

    A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

  10. Individualized Program Planning (IPP): ECS to Grade 12. Programming for Students with Special Needs

    ERIC Educational Resources Information Center

    Online Submission, 2006

    2006-01-01

    This resource is a revision of the teaching resource Individualized Program Plans (1995), Book 3 (ED392232) in the Programming for Students with Special Needs series. It aims to create a bridge between the product, the process and the underlying vision of Individualized Program Planning (IPP). The Standards for Special Education (Amended June…

  11. Civilian radioactive waste management program plan. Revision 2

    SciTech Connect

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  12. How To Plan a Conservation Education Program.

    ERIC Educational Resources Information Center

    Wood, David S.; Wood, Diane Walton

    Designed to provide assistance to natural resource managers in the preparation of conservation educator programs and materials, this manual describes specific procedures for developing programs that would have significant environmental impact. Five steps are identified and explained under separate chapter headings. Each chapter concludes with a…

  13. Handbook for Planning an Effective Reading Program.

    ERIC Educational Resources Information Center

    Far West Lab. for Educational Research and Development, San Francisco, CA.

    Intended to help provide breadth to a reading program, this handbook emphasizes that reading is learned and reinforced through the use of the other language skills: listening, speaking, and writing. The first section relates to key instructional components of effective reading programs and includes divisions dealing with skill development…

  14. Planning and Implementing Health Screening Programs.

    ERIC Educational Resources Information Center

    Webster, Katherine P.

    1980-01-01

    School health screening programs, which include screening, education of children and parents, and follow-up in the form of appropriate treatment, are described. A scoliosis screening program is described as an example of the model presented. Suggestions for planners, participants, and evaluators of any school health screening are summarized. (JMF)

  15. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE... development of new marketing strategies; to advance the image and desirability of, increase the efficiency of..., effectuation, administration, and evaluation of programs, plans, and projects for marketing...

  16. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE... development of new marketing strategies; to advance the image and desirability of, increase the efficiency of..., effectuation, administration, and evaluation of programs, plans, and projects for marketing...

  17. 7 CFR 1221.121 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....121 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SORGHUM... evaluate, or on its own initiative develop, and submit to the Secretary for approval any program, plan,...

  18. 7 CFR 1221.121 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....121 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SORGHUM... evaluate, or on its own initiative develop, and submit to the Secretary for approval any program, plan,...

  19. 7 CFR 1221.121 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....121 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SORGHUM... evaluate, or on its own initiative develop, and submit to the Secretary for approval any program, plan,...

  20. Revised plans for Hot Dry Rock geothermal program

    SciTech Connect

    Murphy, Hugh D.

    1987-03-10

    This letter is our response to your February 13 letter directing us to respond to Headquarters' request for new HDR program plans. This request was initiated by John E. Mock, CE-342, HQ. Our response is organized as three attachments.

  1. Highly enriched uranium (HEU) storage and disposition program plan

    SciTech Connect

    Arms, W.M.; Everitt, D.A.; O`Dell, C.L.

    1995-01-01

    Recent changes in international relations and other changes in national priorities have profoundly affected the management of weapons-usable fissile materials within the United States (US). The nuclear weapon stockpile reductions agreed to by the US and Russia have reduced the national security requirements for these fissile materials. National policies outlined by the US President seek to prevent the accumulation of nuclear weapon stockpiles of plutonium (Pu) and HEU, and to ensure that these materials are subjected to the highest standards of safety, security and international accountability. The purpose of the Highly Enriched Uranium (HEU) Storage and Disposition Program Plan is to define and establish a planned approach for storage of all HEU and disposition of surplus HEU in support of the US Department of Energy (DOE) Fissile Material Disposition Program. Elements Of this Plan, which are specific to HEU storage and disposition, include program requirements, roles and responsibilities, program activities (action plans), milestone schedules, and deliverables.

  2. Planned Maintenance Programs: A Memorandum to Facility Officers.

    ERIC Educational Resources Information Center

    Glass, Thomas E.

    1984-01-01

    Good school maintenance can save money that can later be used for educational programs. Appropriate activities are listed to obtain community support. Specific areas to be addressed in a district maintenance plan are listed. (MLF)

  3. Federal Geothermal Program Plan for Fiscal Year 1983

    SciTech Connect

    1983-03-01

    This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This is a report of the Interagency Geothermal Coordinating Committee (IGCC). (DJE 2005)

  4. Program plan for the Modular Integrated Video System

    SciTech Connect

    Gaertner, K.J.; Heaysman, B.; Holt, R.; Sonnier, C.

    1986-01-01

    The Modular Integrated Video System (MIVS) is intended to provide a simple, highly reliable CCTV system capable of replacing the IAEA Twin Minolta Film Camera Systems. The program plan is described. The principal steps in this plan are: identification of the need for the system, assessment of state/facility acceptance, specification formulation and approval, reliability/performance certification test program formulation and approval, prototype system development and demonstration, system modification as required, establishment of a production capability, delivery of the first production quantity, reliability/performance certification test program, field evaluation program, system production, and implementation. The IAEA and developer responsibilities throughout this development testing and implementation process are also described.

  5. Transuranic Waste Characterization Quality Assurance Program Plan

    SciTech Connect

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  6. Program Planning. A Higher Education Training Monograph.

    ERIC Educational Resources Information Center

    Turner, Susan

    This training monograph was produced by the Manpower Development Higher Education System and provides manpower planners with the types of theoretical and practical information necessary to achieve planning effectiveness. The training is designed for delivery on three consecutive days. The material is most appropriate for the new planner or for the…

  7. The cryogenics analysis program for Apollo mission planning and analysis

    NASA Technical Reports Server (NTRS)

    Scott, W.; Williams, J.

    1971-01-01

    The cryogenics analysis program was developed as a simplified tool for use in premission planning operations for the Apollo command service module. Through a dynamic development effort, the program has been extended to include real time and postflight analysis capabilities with nominal and contingency planning features. The technical aspects of the program and a comparison of ground test and mission data with data generated by using the cryogenics analysis program are presented. The results of the program capability to predict flight requirements also are presented. Comparisons of data from the program with data from flight results, from a tank qualifications program, and from various system anomalies that have been encountered are discussed. Future plans and additional considerations for the program also are included. Among these plans are a three tank management scheme for hydrogen, venting profile generation for Skylab, and a capability for handling two gas atmospheres. The plan for two gas atmospheres will involve the addition of the capability to handle nitrogen as well as oxygen and hydrogen.

  8. Weatherization and Intergovernmental Program - State Energy Program Helps States Plan and Implement Energy Efficiency

    SciTech Connect

    2010-06-01

    State energy offices use SEP funds to develop state plans that identify opportunities for adopting renewable energy and energy efficiency technologies, and implementing programs to improve energy sustainability.

  9. Space shuttle maintenance program planning document

    NASA Technical Reports Server (NTRS)

    Brown, D. V.

    1972-01-01

    A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

  10. 1997 Operating plan for the Office of International Health Programs

    SciTech Connect

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  11. Career Planning in the Teacher Preparation Program (TPP).

    ERIC Educational Resources Information Center

    Greis, Naguib

    The question posed by this paper is: How can a teacher preparation program (TPP) guide participants in the critical area of career planning, which is also important to the profession? The aim of this article is to describe the structure of a proposed special career planning course, in light of the relevant areas in current practice and the…

  12. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    ERIC Educational Resources Information Center

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  13. Supplement to the Handbook for Institutional Academic and Program Planning.

    ERIC Educational Resources Information Center

    Cherin, Ellen; Armijo, Frank

    Sample procedures, data formats; questionnaires, and explanations are presented that institutions can use to adapt and implement the planning process described in "A Handbook for Institutional and Academic Program Planning: From Idea to Implementation" (Kieft, Armijo, and Bucklew, 1978). Materials are designed for use by two-year and four-year…

  14. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... land use. 9.15 Section 9.15 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... programs affecting land use. The Agency shall take floodplain management into account when formulating or evaluating any water and land use plans. No plan may be approved unless it: (a) Reflects consideration...

  15. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... land use. 9.15 Section 9.15 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... programs affecting land use. The Agency shall take floodplain management into account when formulating or evaluating any water and land use plans. No plan may be approved unless it: (a) Reflects consideration...

  16. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... land use. 9.15 Section 9.15 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... programs affecting land use. The Agency shall take floodplain management into account when formulating or evaluating any water and land use plans. No plan may be approved unless it: (a) Reflects consideration...

  17. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... land use. 9.15 Section 9.15 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... programs affecting land use. The Agency shall take floodplain management into account when formulating or evaluating any water and land use plans. No plan may be approved unless it: (a) Reflects consideration...

  18. Basic Steps in Planning Resident Outdoor Education Programs.

    ERIC Educational Resources Information Center

    Nassau County Board of Cooperative Educational Services, Westbury, NY.

    Intended to serve as a planning guide for teachers who become involved for the first time in the resident camping phase of an outdoor education program, this document answers the question of where to initiate the planning process and what sequential form the process should follow. Site familiarization is the first step to be taken, and information…

  19. Administering Adult Literacy Programs: The Role of Strategic Planning.

    ERIC Educational Resources Information Center

    Michael, Steve Olu

    In an era of rising public criticism of education and decreasing resources, strategic planning can be a major tool for educational administrators who wish to respond to the increasing challenges their adult literacy programs face. Strategic planning can be defined as a disciplined effort to produce fundamental decisions and actions that shape and…

  20. Is Program Planning Just a Ritual?

    ERIC Educational Resources Information Center

    Durfee, Arthur E.

    1976-01-01

    The failure of supervisors to follow through with helpful interest and discussion has had a debilitating impact on too many Extension programs. The accountability aspect is explored using seven questions with which Extension professionals should be concerned. (ABM)

  1. Program Development Plan and Team up

    SciTech Connect

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  2. Integrated Technology Plan for the Civil Space Program, 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of the Integrated Technology Plan (ITP) is to serve as a strategic plan for the OAST space research and technology (R&T) program, and as a strategic planning framework for other NASA and national participants in advocating and conducting technology developments that support future U.S. civil space missions. The ITP begins with a discussion of the national policy and NASA organization which establishes the overall framework for civil space R&T planning. The second chapter provides a top-level review of the potential users of civil space R&T, their strategic mission plans, and the technologies they have identified as needed to achieve those plans. The overall methodology used to develop a civil space technology strategy is discussed. The technical details of the 1991 strategic plan are described, ending with a review of civil space R&T priorities. The fourth chapter describes how the strategic plan is annually translated into the OAST Space R&T Program, with a summary of the fiscal year 1992 program. The ITP concludes with a discussion of requirements for technology development coordination and strategies for facilitating the transfer of civil space technology to the private sector. Several appendices also are attached that provide further information regarding budget implications of the strategic plan, organizational roles, and other topics.

  3. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    SciTech Connect

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  4. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  5. Quality assurance program plan for radionuclide airborne emissions monitoring

    SciTech Connect

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented.

  6. Planning an Effective Speakers Outreach Program

    NASA Technical Reports Server (NTRS)

    McDonald, Malcolm W.

    1996-01-01

    The National Aeronautics and Space Administration (NASA) and, in particular, the Marshall Space Flight Center (MSFC) have played pivotal roles in the advancement of space exploration and space-related science and discovery since the early 1960's. Many of the extraordinary accomplishments and advancements of NASA and MSFC have gone largely unheralded to the general public, though they often border on the miraculous. This lack of suitable and deserved announcement of these "miracles" seems to have occurred because NASA engineers and scientists are inclined to regard extraordinary accomplishment as a normal course of events. The goal in this project has been to determine an effective structure and mechanism for communicating to the general public the extent to which our investment in our US civilian space program, NASA, is, in fact, a very wise investment. The project has involved discerning important messages of truth which beg to be conveyed to the public. It also sought to identify MSFC personnel who are particularly effective as messengers or communicators. A third aspect of the project was to identify particular target audiences who would appreciate knowing the facts about their NASA investment. The intent is to incorporate the results into the formation of an effective, proactive MSFC speakers bureau. A corollary accomplishment for the summer was participation in the formation of an educational outreach program known as Nasa Ambassadors. Nasa Ambassadors are chosen from the participants in the various MSFC summer programs including: Summer Faculty Fellowship Program (SFFP), Science Teacher Enrichment Program (STEP), Community College Enrichment Program (CCEP), Joint Venture (JOVE) program, and the NASA Academy program. NASA Ambassadors agree to make pre-packaged NASA-related presentations to non-academic audiences in their home communities. The packaged presentations were created by a small cadre of participants from the 1996 MSFC summer programs, volunteering

  7. Zero discharge programs require careful planning

    SciTech Connect

    Buecker, B.

    1997-05-01

    Environmental regulations, increasing scarcity of fresh water supplies and rising costs of clean water production have contributed to greater water conservation throughout the country. Reduced or zero discharge programs have become much more commonplace at electric utilities, chemical process industries and manufacturing facilities. Water conservation can be a very complicated issue, with methods varying considerably from site to site. The issues that influence water reduction programs include: quality, quantity and cost of fresh water available to the plant; quality of water needed for various plant processes; ability to recycle wastewater streams to other plant processes; techniques for water treatment; capital, operations, maintenance and labor costs, and floor space and construction requirements for water treatment equipment, pilot testing of proposed treatment methods and environmental restrictions on the quantity and quality of any wastewater that may be discharged. This article describes several water discharge programs available to address the complex needs of each unique plant site.

  8. Near coastal program plan for 1991: Estuaries

    SciTech Connect

    Not Available

    1990-11-01

    Environmental regulatory programs in the United States have been estimated to cost more than $70 billion annually. The Environmental Monitoring and Assessment Program (EMAP) is a nationwide initiative being implemented by EPA's Office of Research and Development (ORD). It was developed in response to the demand for information on the condition of the nation's ecological resources. The goal of EMAP is to assess and document the status and trends in the condition of the nation's forests, wetlands, estuaries, coastal waters, lakes, rivers, and streams, Great Lakes, agricultural lands, and arid lands on an integrated and continuing basis.

  9. Development of an interactive computer program for advance care planning

    PubMed Central

    Green, Michael J.; Levi, Benjamin H.

    2013-01-01

    Objective To describe the development of an innovative, multimedia decision aid for advance care planning. Background Advance care planning is an important way for people to articulate their wishes for medical care when they are not able to speak for themselves. Living wills and other types of advance directives are the most commonly used tools for advance care planning, but have been criticized for being vague, difficult to interpret, and inconsistent with individuals’ core beliefs and values. Results We developed a multimedia, computer-based decision aid for advance care planning (‘Making Your Wishes Known: Planning Your Medical Future’) to overcome many of the limitations of standard advance directive forms. This computer program guides individuals through the process of advance care planning, and unlike standard advance directives, provides tailored education, values clarification exercises, and a decision-making tool that translates an individual’s values and preferences into a specific medical plan that can be implemented by a health-care team. Pilot testing with 50 adult volunteers recruited from an outpatient primary care clinic showed high levels of satisfaction with the program. Further pilot testing with 34 cancer patients indicated that the program was perceived to be highly accurate at representing patients’ wishes. Conclusions This paper describes the development of an innovative decision aid for advance care planning that was designed to overcome common problems with standard advance directives. Preliminary testing suggests that it is acceptable to users and is accurate. PMID:18823445

  10. How to Plan a College Program for Older People.

    ERIC Educational Resources Information Center

    Scanlon, John

    Recommendations are offered in this manual for planning, organizing, and financing academic programs for older people, based on the experience of institutions already conducting programs for older students, on current thinking in gerontology, and on knowledge and experience of staff and consultants of the Academy for Educational Development. Three…

  11. The Role of Communications in Population and Family Planning Programs.

    ERIC Educational Resources Information Center

    Sweeney, William O.

    In this paper, the author outlines the historical development of information and education programs for population control and family planning, arguing that communications activities should receive as much emphasis as the health services program. The public information aspect includes use of mass media, advertising and promotion, public relations…

  12. TTIP: Texas Teacher Internship Program 1994 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    The Texas Teacher Internship Program (TTIP) is a competitive program for science, technology and mathematics teachers who serve as summer interns at industry and university sites in order to experience real world applications of the subjects they teach. This document contains curriculum implementation plans developed by the teachers to illustrate…

  13. Personal and Family Financial Planning: Perspectives on Community College Programs.

    ERIC Educational Resources Information Center

    Leo, Robert J.; And Others

    After a brief summary of the findings of a 1979 study of Personal and Family Financial Planning (PFFP) programs at member institutions of the League for Innovation in the Community College (LICC), this two-part monograph provides information on selected PFFP programs. Part I presents in-depth descriptions of the implementation, subject coverage,…

  14. Agricultural Supplies and Services. Program Planning Guide: Volume 2.

    ERIC Educational Resources Information Center

    Welton, Richard; Marks, Michael

    The program planning guide for agricultural supplies and services was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of agricultural chemicals, feeds, seeds, fertilizers, and…

  15. The Living with a Star Program Mission Plan

    NASA Technical Reports Server (NTRS)

    Barth, Janet; Day, John (Technical Monitor)

    2001-01-01

    LWS (Living With a Star) is research science focused to facilitate enabling science for spacecraft design (specifically environment specification models) and spacecraft operations (specifically Space Weather research). The following topics are discussed: LWS goals and program, program architecture, the solar dynamic observer, the geospace plan, the space environment testbed concept, and the heliosphere missions.

  16. Planning Techniques for Local Programs of Vocational Education.

    ERIC Educational Resources Information Center

    Malinski, Joseph F.

    This paper presents a synthesis of the development of educational management practices, with the aim of improving communications among the various institutions providing vocational programs at the local level and the agencies providing programs support at local, state, and national levels. The planning and management cycle consists of: (1) policy…

  17. Drunk Driving Public Information Program Strategies and Planning Guide.

    ERIC Educational Resources Information Center

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This guide, designed to accompany a videocassette of selected television spots is a compendium of specific drunk driving topics and issues for each of the major planning steps of a public information program. The guide is organized around these steps, which are (1) select program strategies, (2) select target audiences, (3) select media channels,…

  18. Course Length Versus Course Price: Marketing Factors in Program Planning.

    ERIC Educational Resources Information Center

    Lamoureux, Marvin E.

    Recent program planning literature involving adult education has attempted to draw upon techniques from marketing management. Most of the literature has, however, not explored the relationship between adult education program decision needs and fundamental marketing concepts. Adult educators and marketing managers are conducting similar daily…

  19. Planning and Programming for Handicapped Young Children; Tadscript 4.

    ERIC Educational Resources Information Center

    Hayes, Andrew E.; Ellis, Norman E.

    Presented is a state-by-state summary of programs and activities for young handicapped children obtained through a 1973 survey of 37 state directors of special education. Each summary includes a brief description of legislation and current programs, plans, and needs. Summarized are general problems common to all states such as a lack of specific…

  20. Configuration management program plan for Hanford site systems engineering

    SciTech Connect

    Kellie, C.L.

    1996-03-28

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  1. The NASA computer science research program plan

    NASA Technical Reports Server (NTRS)

    1983-01-01

    A taxonomy of computer science is included, one state of the art of each of the major computer science categories is summarized. A functional breakdown of NASA programs under Aeronautics R and D, space R and T, and institutional support is also included. These areas were assessed against the computer science categories. Concurrent processing, highly reliable computing, and information management are identified.

  2. Planning Public Relations Programs for Exceptional Events.

    ERIC Educational Resources Information Center

    McElreath, Mark P.

    This paper discusses Program Management (PM), a decision-making process which uses a diachronic, idea-generating communication mode. Decision making according to a PM model entails obtaining a mandate or authorization, identifying the problem, exploring for knowledge and generating solutions, reviewing proposals and developing resources,…

  3. Probation Program Planning for Youthful Offenders

    ERIC Educational Resources Information Center

    Weinberg, Henry

    1977-01-01

    Describes a program of early intervention in the cases of youthful adult offenders appearing before a district court that was developed by a probation officer, a career developer, an administrative assistant-coordinator, and three probation aides in the Brockton, Massachusetts district court. (Author/RK)

  4. Strategic Planning to Improve EHDI Programs

    ERIC Educational Resources Information Center

    White, Karl R.; Blaiser, Kristina M.

    2011-01-01

    Because newborn hearing screening has become the standard of care in the United States, every state has established an early hearing detection and intervention (EHDI) program responsible for establishing, maintaining, and improving the system of services needed to serve children with hearing loss and their families. While significant developments…

  5. Operating and Assurance Program Plan. Revision 4

    SciTech Connect

    Not Available

    1994-07-01

    The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

  6. Data Driven Program Planning for GIS Instruction

    ERIC Educational Resources Information Center

    Scarletto, Edith

    2013-01-01

    This study used both focus groups (qualitative) and survey data (quantitative) to develop and expand an instruction program for GIS services. It examined the needs and preferences faculty and graduate students have for learning about GIS applications for teaching and research. While faculty preferred in person workshops and graduate students…

  7. Subseabed Disposal Program Plan. Volume I. Overview

    SciTech Connect

    1981-07-01

    The primary objective of the Subseabed Disposal Program (SDP) is to assess the scientific, environmental, and engineering feasibility of disposing of processed and packaged high-level nuclear waste in geologic formations beneath the world's oceans. High-level waste (HLW) is considered the most difficult of radioactive wastes to dispose of in oceanic geologic formations because of its heat and radiation output. From a scientific standpoint, the understanding developed for the disposal of such HLW can be used for other nuclear wastes (e.g., transuranic - TRU - or low-level) and materials from decommissioned facilities, since any set of barriers competent to contain the heat and radiation outputs of high-level waste will also contain such outputs from low-level waste. If subseabed disposal is found to be feasible for HLW, then other factors such as cost will become more important in considering subseabed emplacement for other nuclear wastes. A secondary objective of the SDP is to develop and maintain a capability to assess and cooperate with the seabed nuclear waste disposal programs of other nations. There are, of course, a number of nations with nuclear programs, and not all of these nations have convenient access to land-based repositories for nuclear waste. Many are attempting to develop legislative and scientific programs that will avoid potential hazards to man, threats to other ocean uses, and marine pollution, and they work together to such purpose in meetings of the international NEA/Seabed Working Group. The US SDP, as the first and most highly developed R and D program in the area, strongly influences the development of subseabed-disposal-related policy in such nations.

  8. Oil program implementation plan FY 1996--2000

    SciTech Connect

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  9. Systems engineering implementation plan for the liquid effluents services program

    SciTech Connect

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described.

  10. U.S. Department of Education FY 2000 Annual Plan, Volume 2: Program Performance Plans.

    ERIC Educational Resources Information Center

    Department of Education, Washington, DC.

    This volume of the Department of Education's (ED) annual plan contains the program-performance plans to support efforts to reach the department's four goals. These four goals are as follows: (1) help all students reach challenging academic standards so that they are prepared for responsible citizenship, further learning, and productive employment;…

  11. Program plan for EMP survivability of Navy C2 systems

    SciTech Connect

    Latorre, V.R.; Greenwell, R.A.

    1986-08-01

    This report provides a plan for implementing the Navy Tactical C2 EMP Survivability Program. This program will emphasize the development of EMP standards and specifications for all phases of a C2 system's life from its concept formulation phase through its total in service life. In order to achieve an EMP survivable Navy C2 system, the US Navy must develop a program that will provide appropriate guidance and direction.

  12. Tank farm waste characterization Technology Program Plan

    SciTech Connect

    Hohl, T.M.; Schull, K.E.; Bensky, M.S.; Sasaki, L.M.

    1989-03-01

    This document presents technological and analytical methods development activities required to characterize, process, and dispose of Hanford Site wastes stored in underground waste tanks in accordance with state and federal environmental regulations. The document also lists the need date, current (fiscal year 1989) funding, and estimate of future funding for each task. Also identified are the impact(s) if an activity is not completed. The document integrates these needs to minimize duplication of effort between the various programs involved.

  13. Tanks focus area multiyear program plan - FY96-FY98

    SciTech Connect

    1995-07-01

    The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary.

  14. Effectiveness of publications in family planning program.

    PubMed

    Noor Laily Abu Bakar; Tan, B A; Tey, N P; Yusuf, Y

    1983-12-01

    The aim of the present study is to evaluate the degree of exposure to to Information, Education, and Communication (I.E.C.) publications such as pamphlets and booklets on contraceptive methods among those who have attended the dialog sessions; and to investigate the effects of such exposure on contraceptive use as well as the ppropensity to talk about family planning. The survey, conducted by the National Family Planning Board and assisted by the Sciences University of Malaysia in 1978/79, covers 6 states. A total of 1190 respondents were selected from those who attended dialog sessions during that period. Of the total sample, 723 respondents (60.8%) were contacted and interviewed. The I.E.C. publications evaluated in this survey include booklets on methods of contraception; pamphlets on the pill, IUD, condom, rhythm method, tubal ligation, vasectomy; booklets on responsible parenthood, flip charts and posters. 61% of the respondents have been exposed to at least 1 form of the I.E.C. materials. About 17 to 18% of currently married respondents have been exposed to pamphlets on tubal ligation, rhythm methods, IUD and condom; 22% have been exposed to pamphlets on the pill and 43% to booklets on contraceptive methods. In gerneral, those who have been exposed to pamphlets on a particular method were more likely to use that method. Among those who have been exposed to pamphlets on the pill 26.4% were using the pill compared to 16.2% who have not been exposed. The proportion of condom users were 3 times more after exposure to pamphlets on the condom: 16% vs. 4.7%. About 50% of currently married respondents were using a contraceptive method at the time of the survey. Of those who have not been exposed to I.E.C. materials, only 34.4% were using a method, compared to 53-60% of those who had been exposed. Exposure to I.E.C. materials and its interaction with ethnicity act as the most important factor in accounting for the differntials in contraceptive use, both in the

  15. Constance mirror program: Progress and plans

    NASA Astrophysics Data System (ADS)

    Klinkowstein, R. E.; Mauel, M. E.; Irby, J. H.; Smullin, L. D.; Voldman, S. H.

    1981-03-01

    The current state of the mechanics of the Constance II experiment, the physics results gathered, the motivation background, and future plans for the Constance II experiment are reviewed. Several improvements have been made and several experimental investigations have been completed. These include the construction/installation/testing of: (1) liquid-nitrogen cooled, Ioffe bars installed, (2) a diverter coil (3) the 100 kW ICRF generator, (4) the data acquisition system, and (5) the optimum hot-iron operation of the machine with Titanium and pulsed-gas plasma guns. Measurements were made of the density, temperature, and radius of the plasma. Ion-cyclotron fluctuations were observed, their bandwidth measured, and data collected demonstrating resonance heating. New X-ray diagnostics were designed and purchased, and progress on the Thomson scattering was made. Finally, a new hot cathode gun was designed and constructed.

  16. Constance mirror program: Progress and plans

    NASA Technical Reports Server (NTRS)

    Klinkowstein, R. E.; Mauel, M. E.; Irby, J. H.; Smullin, L. D.; Voldman, S. H.

    1981-01-01

    The current state of the mechanics of the Constance II experiment, the physics results gathered, the motivation background, and future plans for the Constance II experiment are reviewed. Several improvements have been made and several experimental investigations have been completed. These include the construction/installation/testing of: (1) liquid-nitrogen cooled, Ioffe bars installed, (2) a diverter coil (3) the 100 kW ICRF generator, (4) the data acquisition system, and (5) the optimum hot-iron operation of the machine with Titanium and pulsed-gas plasma guns. Measurements were made of the density, temperature, and radius of the plasma. Ion-cyclotron fluctuations were observed, their bandwidth measured, and data collected demonstrating resonance heating. New X-ray diagnostics were designed and purchased, and progress on the Thomson scattering was made. Finally, a new hot cathode gun was designed and constructed.

  17. Active microwave users working group program planning

    NASA Technical Reports Server (NTRS)

    Ulaby, F. T.; Bare, J.; Brown, W. E., Jr.; Childs, L. F.; Dellwig, L. F.; Heighway, J. E.; Joosten, R.; Lewis, A. J.; Linlor, W.; Lundien, J. R.

    1978-01-01

    A detailed programmatic and technical development plan for active microwave technology was examined in each of four user activities: (1) vegetation; (2) water resources and geologic applications, and (4) oceanographic applications. Major application areas were identified, and the impact of each application area in terms of social and economic gains were evaluated. The present state of knowledge of the applicability of active microwave remote sensing to each application area was summarized and its role relative to other remote sensing devices was examined. The analysis and data acquisition techniques needed to resolve the effects of interference factors were reviewed to establish an operational capability in each application area. Flow charts of accomplished and required activities in each application area that lead to operational capability were structured.

  18. Mixed Waste Integrated Program Quality Assurance requirements plan

    SciTech Connect

    Not Available

    1994-04-15

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities.

  19. The Indonesian family planning program: its strategy for the future.

    PubMed

    Suyono, H; Parsons, J S; Teachman, J D

    1978-01-01

    This paper discusses the strategy of the Indonesian national family planning program for the coming 5-10 years, in which communities will be given greater responsibility for their own fertility limitation programs and a stronger alliance with other government programs will be sought in order to assure the long-term success of both family planning and development activities. The article explains why more vigorous fertility limitation efforts will be required in the future despite encouraging results so far, and describes the structure of the Indonesian national family planning program. The rationale behind the move away from clinics as depensers of family planning services is examined, and the community family planning approach in Bali is described and compared to that in Java. The differing approach to service delivery in the Outer Islands is then discussed. The relationship between development and the small family norm is discussed, and efforts underway to maximize cooperation between the family planning and development sector projects are described. PMID:12309781

  20. Hanford Site waste tank farm facilities design reconstitution program plan

    SciTech Connect

    Vollert, F.R.

    1994-09-06

    Throughout the commercial nuclear industry the lack of design reconstitution programs prior to the mid 1980`s has resulted in inadequate documentation to support operating facilities configuration changes or safety evaluations. As a result, many utilities have completed or have ongoing design reconstitution programs and have discovered that without sufficient pre-planning their program can be potentially very expensive and may result in end-products inconsistent with the facility needs or expectations. A design reconstitution program plan is developed here for the Hanford waste tank farms facility as a consequence of the DOE Standard on operational configuration management. This design reconstitution plan provides for the recovery or regeneration of design requirements and basis, the compilation of Design Information Summaries, and a methodology to disposition items open for regeneration that were discovered during the development of Design Information Summaries. Implementation of this plan will culminate in an end-product of about 30 Design Information Summary documents. These documents will be developed to identify tank farms facility design requirements and design bases and thereby capture the technical baselines of the facility. This plan identifies the methodology necessary to systematically recover documents that are sources of design input information, and to evaluate and disposition open items or regeneration items discovered during the development of the Design Information Summaries or during the verification and validation processes. These development activities will be governed and implemented by three procedures and a guide that are to be developed as an outgrowth of this plan.

  1. WASTE CERTIFICATION PROGRAM PLAN - REVISION 7

    SciTech Connect

    MORGAN, LK

    2002-01-08

    The primary changes that have been made to this revision reflect the relocation of the Waste Certification Official (WCO) organizationally from the Quality Services Division (QSD) into the Laboratory Waste Services (LWS) Organization. Additionally, the responsibilities for program oversight have been differentiated between the QSD and LWS. The intent of this effort is to ensure that those oversight functions, which properly belonged to the WCO, moved with that function; but retain an independent oversight function outside of the LWS Organization ensuring the potential for introduction of organizational bias, regarding programmatic and technical issues, is minimized. The Waste Certification Program (WCP) itself has been modified to allow the waste certification function to be performed by any of the personnel within the LWS Waste Acceptance/Certification functional area. However, a single individual may not perform both the technical waste acceptance review and the final certification review on the same 2109 data package. Those reviews must be performed by separate individuals in a peer review process. There will continue to be a designated WCO who will have lead programmatic responsibility for the WCP and will exercise overall program operational oversite as well as determine the overall requirements of the certification program. The quality assurance organization will perform independent, outside oversight to ensure that any organizational bias does not degrade the integrity of the waste certification process. The core elements of the previous WCP have been retained, however, the terms and process structure have been modified.. There are now two ''control points,'' (1) the data package enters the waste certification process with the signature of the Generator Interface/Generator Interface Equivalent (GI/GIE), (2) the package is ''certified'', thus exiting the process. The WCP contains three steps, (1) the technical review for waste acceptance, (2) a review of the

  2. Fiscal year 1986 program plan for the Defense Transuranic Waste Program (DTWP)

    SciTech Connect

    Not Available

    1985-11-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy is national planning, integration, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 86 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of all R D activities meet requirements tated in the Technical Management Plan for the Transuranic Waste Management Program. The Program Plan is revised as needed. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 86; outyear budget projections are presented for future years.

  3. Program Plan for 2005: NASA Scientific and Technical Information Program

    NASA Technical Reports Server (NTRS)

    2005-01-01

    Throughout 2005 and beyond, NASA will be faced with great challenges and even greater opportunities. Following a period of reevaluation, reinvention, and transformation, we will move rapidly forward to leverage new partnerships, approaches, and technologies that will enhance the way we do business. NASA's Scientific and Technical Information (STI) Program, which functions under the auspices of the Agency's Chief Information Officer (CIO), is an integral part of NASA's future. The program supports the Agency's missions to communicate scientific knowledge and understanding and to help transfer NASA's research and development (R&D) information to the aerospace and academic communities and to the public. The STI Program helps ensure that the Agency will remain at the leading edge of R&D by quickly and efficiently capturing and sharing NASA and worldwide STI to use for problem solving, awareness, and knowledge management and transfer.

  4. Strategic plan for the geothermal energy program

    SciTech Connect

    1998-06-01

    Geothermal energy (natural heat in the Earth`s crust) represents a truly enormous amount of energy. The heat content of domestic geothermal resources is estimated to be 70,000,000 quads, equivalent to a 750,000-year supply of energy for the entire Nation at current rates of consumption. World geothermal resources (exclusive of resources under the oceans) may be as much as 20 times larger than those of the US. While industry has focused on hydrothermal resources (those containing hot water and/or steam), the long-term future of geothermal energy lies in developing technology to enable use of the full range of geothermal resources. In the foreseeable future, heat may be extracted directly from very hot rocks or from molten rocks, if suitable technology can be developed. The US Department of Energy`s Office of Geothermal Technologies (OGT) endorses a vision of the future in which geothermal energy will be the preferred alternative to polluting energy sources. The mission of the Program is to work in partnership with US industry to establish geothermal energy as a sustainable, environmentally sound, economically competitive contributor to the US and world energy supply. In executing its mission and achieving its long-term vision for geothermal energy, the Program has identified five strategic goals: electric power generation; direct use applications and geothermal heat pumps; international geothermal development; science and technology; and future geothermal resources. This report discusses the objectives of these five goals.

  5. 23 CFR 450.308 - Funding for transportation planning and unified planning work programs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... provisions of this section and 23 CFR part 420. (c) Except as provided in paragraph (d) of this section, each... State's planning work program, in accordance with 23 CFR part 420. (e) Arrangements may be made with the... contained in 23 CFR part 420 and FTA Circular C8100.1B (Program Guidance and Application Instructions...

  6. A Preliminary Evaluation of Richmond Plan Programs (Pre-Technical Plan) in Secondary Schools. Final Report.

    ERIC Educational Resources Information Center

    Kincaid, Harry V.; Hamilton, Phyllis D.

    Descriptive data were collected in the form of program case histories, student and teacher surveys and interviews, and school records from eight schools (1966-67) and two schools (1967-68) that were conducting Richmond Plan type programs for average underachieving secondary students. In writing this evaluation, two major questions were asked,…

  7. Program plan, and request for reprogramming first year funds

    SciTech Connect

    Not Available

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  8. Integrated High Payoff Rocket Propulsion Technologies Program Material Development Plan

    NASA Technical Reports Server (NTRS)

    Clinton, R. G., Jr.; Stropki, M.; Cleyrat, D.; Stucke, B.; Phillips, S.; Reed, B.

    2001-01-01

    In this viewgraph presentation, IMWG (IHPRPT Materials Working Group) government and industry members, together with the IHPRPT (Integrated High Payoff Rocket Propulsion Technologies Program Material Development Plan) National Component Leads, have developed a materials plan to address the critical needs of the IHPRPT community: (1) liquids boost and orbit transfer; (2) solids boost and orbit transfer; (3) tactical propulsion; and (4) spacecraft propulsion. Criticality of materials' role in achieving IHPRPT goals is evidenced by the significant investment over the next five years.

  9. MIP- MULTIMISSION INTERACTIVE PICTURE PLANNING PROGRAM

    NASA Technical Reports Server (NTRS)

    Callahan, J. D.

    1994-01-01

    The Multimission Interactive Picture Planner, MIP, is a scientifically accurate and fast, 3D animation program for deep space. MIP is also versatile, reasonably comprehensive, portable, and will run on microcomputers. New techniques were developed to rapidly perform the calculations and transformations necessary to animate scientifically accurate 3D space. At the same time, portability is maintained, as the transformations and clipping have been written in FORTRAN 77 code. MIP was primarily designed to handle Voyager, Galileo, and the Space Telescope. It can, however, be adapted to handle other missions. The space simulation consists of a rotating body (usually a planet), any natural satellites, a spacecraft, the sun, stars, descriptive labelling, and field of view boxes. The central body and natural satellites are tri-axial wireframe representations with terminators, limbs, and landmarks. Hidden lines are removed for the central body and natural satellites, but not for the scene as a whole so that bodies may be seen behind one another. The program has considerable flexibility in its step time, observer position, viewed object, field of view, etc. Most parameters may be changed from the keyboard while the simulation is running. When MIP is executed it will ask the user for a control file, which should be prepared before execution. The control file identifies which mission MIP should simulate, the star catalog files, the ephemerides files to be used, the central body, planets, asteroids, and comets, and solar system landmarks and constants such as planets, asteroids, and comets. The control file also describes the fields of view. Control files are included to simulate the Voyager 1 encounter at Jupiter and the Giotto spacecraft's flyby of Halley's comet. Data is included for Voyager 1 and 2 (all 6 planetary encounters) and Giotto. MIP was written for an IBM PC or compatibles. It requires 512K of RAM, a CGA or compatible graphics adapter, and DOS 2.0 or higher. Users

  10. Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan

    SciTech Connect

    Casey, Leslie A.

    2004-09-01

    The Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Explosion Monitoring Research and Engineering (NEM R&E) Program is dedicated to providing knowledge, technical expertise, and products to US agencies responsible for monitoring nuclear explosions in all environments and is successful in turning scientific breakthroughs into tools for use by operational monitoring agencies. To effectively address the rapidly evolving state of affairs, the NNSA NEM R&E program is structured around three program elements described within this strategic plan: Integration of New Monitoring Assets, Advanced Event Characterization, and Next-Generation Monitoring Systems. How the Program fits into the National effort and historical accomplishments are also addressed.

  11. Experimental program plan for the Waste Isolation Pilot Plant

    SciTech Connect

    Not Available

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

  12. Human Research Program Integrated Research Plan. Revision A January 2009

    NASA Technical Reports Server (NTRS)

    2009-01-01

    The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  13. Scientists Meet to Plan ALMA Science Program

    NASA Astrophysics Data System (ADS)

    1999-09-01

    world astronomical community." At the Washington conference, scientists will describe in detail ALMA's capabilities in studying galaxies from near the time of their formation to the present; the detection and study of planets and disks around nearby stars; the study of star formation; and the study of the origin, distribution, and evolution of the elements and their isotopes. "ALMA will produce dramatic steps forward in our understanding of objects as close as the planets of our own solar system and as distant as the young galaxies at the edge of the observable universe." said Dr. Paul Vanden Bout, Director of the National Radio Astronomy Observatory. "The purpose of this meeting is to plan how to maximize ALMA's scientific potential." A press briefing on ALMA will take place Thursday, October 7, at 10:30 a.m. EST in the Board Room at CIW. Participants in the briefing include: incoming President of the American Astronomical Society Dr. Anneila Sargent (Caltech), noted author Dr. Alan Boss (CIW Department of Terrestrial Magnetism), Dr. David Spergel (Princeton University), Dr. Robert Eisenstein (NSF Assistant Director for Mathematics & Physical Sciences), Dr. Catherine Cesarky (Director General of the European Southern Observatory), and Dr. Keiichi Kodaira (Director General of the National Astronomical Observatory of Japan). Dr. Anneila Sargent will deliver the conference keynote address on Thursday, Oct. 7, at 8:30 a.m. There is a complete schedule for the meeting, as well as abstracts of invited talks and poster sessions, at the NRAO Web site. The National Radio Astronomy Observatory is a facility of the National Science Foundation and is operated under cooperative agreement by Associated Universities, Inc.

  14. Coal Power Systems strategic multi-year program plans

    SciTech Connect

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  15. General test plan redundant sensor strapdown IMU evaluation program

    NASA Technical Reports Server (NTRS)

    Hartwell, T.; Irwin, H. A.; Miyatake, Y.; Wedekind, D. E.

    1971-01-01

    The general test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The inertial unit contains six gyros and three orthogonal accelerometers. The software incorporates failure detection and correction logic and a land vehicle navigation program. The principal objective of the test is a demonstration of the practicability, reliability, and performance of the inertial measuring unit with failure detection and correction in operational environments.

  16. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  17. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  18. NIF Project Quality Assurance Program Plan Revision E

    SciTech Connect

    Dun, C; Brereton, S; Yatabe, J; Moses, E I

    2001-06-01

    The National Ignition Facility (NIF) is a key constituent of the Department Energy's (DOE's) Stockpile Stewardship Program. The NIF will use inertial confinement fusion (ICF) to produce ignition and energy gain in ICF targets and will perform weapons physics, weapons effects, and high-energy-density experiments in support of national security and civilian objectives. The primary mission of the NIF Project is the design and construction of the facility and equipment, acceptance testing, and activation. To accomplish this mission, the LLNL Director created the NIF Programs Directorate, and within that Directorate, the NIF Project Office to organize and manage the Project. The NIF Project Office establishes this QA Program to ensure its success. This QA Program Plan (QAPP) defines and describes the program--the management system--for specifying, achieving, and assuring the quality of all NIF Project work consistent with the policies of LLNL and the NIF Programs Directorate.

  19. Measuring infrastructure: A key step in program evaluation and planning.

    PubMed

    Schmitt, Carol L; Glasgow, LaShawn; Lavinghouze, S Rene; Rieker, Patricia P; Fulmer, Erika; McAleer, Kelly; Rogers, Todd

    2016-06-01

    State tobacco prevention and control programs (TCPs) require a fully functioning infrastructure to respond effectively to the Surgeon General's call for accelerating the national reduction in tobacco use. The literature describes common elements of infrastructure; however, a lack of valid and reliable measures has made it difficult for program planners to monitor relevant infrastructure indicators and address observed deficiencies, or for evaluators to determine the association among infrastructure, program efforts, and program outcomes. The Component Model of Infrastructure (CMI) is a comprehensive, evidence-based framework that facilitates TCP program planning efforts to develop and maintain their infrastructure. Measures of CMI components were needed to evaluate the model's utility and predictive capability for assessing infrastructure. This paper describes the development of CMI measures and results of a pilot test with nine state TCP managers. Pilot test findings indicate that the tool has good face validity and is clear and easy to follow. The CMI tool yields data that can enhance public health efforts in a funding-constrained environment and provides insight into program sustainability. Ultimately, the CMI measurement tool could facilitate better evaluation and program planning across public health programs. PMID:27037655

  20. Sequential decision plans, benthic macroinvertebrates, and biological monitoring programs

    NASA Astrophysics Data System (ADS)

    Jackson, John K.; Resh, Vincent H.

    1989-07-01

    A common obstacle to the inclusion of benthic macroinvertebrates in water quality monitoring programs is that numerous sample units must be examined in order to distinguish between impacted and unimpacted conditions, which can add significantly to the total cost of a monitoring program. Sequential decision plans can be used to reduce this cost because the number of sample units needed to classify a site as impacted or unimpacted is reduced by an average of 50%. A plan is created using definitions of unimpacted and impacted conditions, a description of the mathematical distribution of the data, and definitions of acceptable risks of type I and II errors. The applicability of using sequential decision plans and benthic macroinvertebrates in water quality monitoring programs is illustrated with several examples (e.g., identifying moderate and extreme changes in species richness in response to acid mine drainage; assessing the impact of a crude oil contamination on the density of two benthic populations; monitoring the effect of geothermal effluents on species diversity). These examples use data conforming to the negative binomial, Poisson, and normal distributions and define impact as changes in population density, species richness, or species diversity based on empirical data or the economic feasibility of the sequential decision plan. All mathematical formulae and intermediate values are provided for the step-by-step calculation of each sequential decision plan.

  1. 20 CFR 653.112 - State agency program budget plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false State agency program budget plans. 653.112 Section 653.112 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR SERVICES OF THE EMPLOYMENT SERVICE SYSTEM Services for Migrant and Seasonal Farmworkers (MSFWs) §...

  2. 20 CFR 653.112 - State agency program budget plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false State agency program budget plans. 653.112 Section 653.112 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR SERVICES OF THE EMPLOYMENT SERVICE SYSTEM Services for Migrant and Seasonal Farmworkers (MSFWs) §...

  3. 30 CFR 77.107-1 - Plans for training programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 77.107-1 Section 77.107-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Qualified and Certified Persons §...

  4. Orbit attitude processor. STS-1 bench program verification test plan

    NASA Technical Reports Server (NTRS)

    Mcclain, C. R.

    1980-01-01

    A plan for the static verification of the STS-1 ATT PROC ORBIT software requirements is presented. The orbit version of the SAPIENS bench program is used to generate the verification data. A brief discussion of the simulation software and flight software modules is presented along with a description of the test cases.

  5. 7 CFR 1215.15 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Programs, plans, and projects. 1215.15 Section 1215.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  6. 7 CFR 1215.15 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Programs, plans, and projects. 1215.15 Section 1215.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  7. 7 CFR 1217.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Programs, plans, and projects. 1217.21 Section 1217.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  8. 7 CFR 1219.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Programs, plans, and projects. 1219.21 Section 1219.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  9. 7 CFR 1219.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans, and projects. 1219.21 Section 1219.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  10. 7 CFR 1219.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Programs, plans, and projects. 1219.21 Section 1219.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  11. 7 CFR 1217.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Programs, plans, and projects. 1217.21 Section 1217.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  12. 7 CFR 1214.15 - Programs, plans and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans and projects. 1214.15 Section 1214.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE CHRISTMAS TREE...

  13. 7 CFR 1214.15 - Programs, plans and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Programs, plans and projects. 1214.15 Section 1214.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE CHRISTMAS TREE...

  14. 7 CFR 1219.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Programs, plans, and projects. 1219.21 Section 1219.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  15. 7 CFR 1217.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans, and projects. 1217.21 Section 1217.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  16. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans, and projects. 1215.40 Section 1215.40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POPCORN PROMOTION, RESEARCH, AND CONSUMER...

  17. 7 CFR 1215.15 - Programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans, and projects. 1215.15 Section 1215.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  18. 7 CFR 1215.15 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Programs, plans, and projects. 1215.15 Section 1215.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  19. 7 CFR 1215.15 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Programs, plans, and projects. 1215.15 Section 1215.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  20. 7 CFR 1221.121 - Programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans, and projects. 1221.121 Section 1221.121 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SORGHUM PROMOTION, RESEARCH, AND INFORMATION ORDER...

  1. 7 CFR 1219.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Programs, plans, and projects. 1219.21 Section 1219.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  2. 7 CFR 1214.15 - Programs, plans and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Programs, plans and projects. 1214.15 Section 1214.15 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE CHRISTMAS TREE...

  3. 7 CFR 1212.60 - Programs, plans and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Programs, plans and projects. 1212.60 Section 1212.60 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE HONEY PACKERS AND IMPORTERS RESEARCH, PROMOTION,...

  4. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    SciTech Connect

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site.

  5. Bioenergy Technologies Office Multi-Year Program Plan: July 2014

    SciTech Connect

    none,

    2014-07-09

    This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  6. 45 CFR 1355.35 - Program improvement plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Program improvement plans. 1355.35 Section 1355.35 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON CHILDREN, YOUTH AND FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION...

  7. Performance assessment implementation plan for the geologic repository program

    SciTech Connect

    1990-01-01

    Performance assessment is a major constituent of the program being conducted in the Civilian Radioactive Waste Management (CRWM) Program of the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations of repository-system performance to access compliance with regulations and to support the development of the geologic repository. To define the strategy for these evaluations, the DOE has developed this performance assessment strategy plan. This document discusses the need for such a strategy, the objectives and scope of the strategy plan, the relationship of the plan to other program plans. Additionally, it defines performance assessment and describes the roles of performance assessment in this program, discusses concepts and general strategies needed for performance assessment, outlines the content of the Safety Analysis Report, summarizes the requirements for the repository Environmental Impact Statement, discusses the requirements that apply to the site-suitability analyses and describes the site characterization. 10 figs., 7 tabs.

  8. TTIP: Texas Teacher Internship Program: 1995 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    In 1989 the Texas Alliance for Science, Technology and Mathematics Education began placing teachers of all levels at industry sites as part of its Texas Teacher Internship Program. In 1995, 15 teachers interned at 11 sites. Each teacher was required to develop a curriculum implementation plan which was to illustrate how they would translate the…

  9. From Strategic Plan to Sustainable Program: One College's Journey

    ERIC Educational Resources Information Center

    Rush, Carol A.

    2010-01-01

    Westmoreland County Community College focused on enhancing success for first-time, full-time, degree-seeking students testing into two or more developmental courses. The project progressed from a planning objective, to a program on a sliding-scale budget, to becoming sustainable in five years. Results include improved retention and enhanced data…

  10. Phased project planning and development in anticipation of operational programs

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  11. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... disbursements of the Board in the administration of this subpart, including the projected costs of Hass avocado..., or on its own initiative develop programs, plans and projects for Hass avocado promotion,...

  12. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... disbursements of the Board in the administration of this subpart, including the projected costs of Hass avocado..., or on its own initiative develop programs, plans and projects for Hass avocado promotion,...

  13. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... disbursements of the Board in the administration of this subpart, including the projected costs of Hass avocado..., or on its own initiative develop programs, plans and projects for Hass avocado promotion,...

  14. Multi-Year Program Plan 2011-2015

    SciTech Connect

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  15. 49 CFR 659.19 - System safety program plan: contents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false System safety program plan: contents. 659.19 Section 659.19 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19...

  16. Preservation at Stony Brook. Preservation Planning Program. Study Report.

    ERIC Educational Resources Information Center

    Cook, Donald C.; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the State University of New York (SUNY), Stony Brook, working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  17. 30 CFR 77.107-1 - Plans for training programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Plans for training programs. 77.107-1 Section 77.107-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Qualified and Certified Persons §...

  18. 30 CFR 77.107-1 - Plans for training programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Plans for training programs. 77.107-1 Section 77.107-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Qualified and Certified Persons §...

  19. Training Program for Operation of Emergency Vehicles. Instructor Lesson Plans.

    ERIC Educational Resources Information Center

    INNOVATRIX, Inc., Ingomar, PA.

    Unit lesson plans for the three parts of the Emergency Vehicle (EV) Operator training program are provided. The units in parts 1 and 2 are designed for use in a classroom setting and contain the following components: description of the unit; trainees' knowledge objectives; instructor preparation activities; instructional content/presentation…

  20. Make safety programs work efficiently with an effective management plan

    SciTech Connect

    Lyle, D.

    1995-07-01

    Like budgets or any other major projects, safety works better when everyone in the company commits to manage the program effectively. Let someone overspend a budget or miss a projected revenue plan and a company moves quickly to correct the problem. However, there is a tendency to ignore a manager whose department has a poor safety record, as though it`s bad luck.

  1. 7 CFR 1217.60 - Programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Programs, plans, and projects. 1217.60 Section 1217.60 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  2. 7 CFR 1217.60 - Programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Programs, plans, and projects. 1217.60 Section 1217.60 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  3. 7 CFR 1217.60 - Programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Programs, plans, and projects. 1217.60 Section 1217.60 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE...

  4. The planning and control of NASA programs and resources

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.

  5. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    SciTech Connect

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

  6. A family planning program that pays for itself.

    PubMed

    1987-07-01

    In Japan, the condom is the method of choice of 82% of all contraceptive users. The Japan Family Planning Association covers about 3% of the total condom market through a well-organized social marketing scheme. Mobile guidance teams, equipped with a vehicle, supply contraceptives to health centers, independent midwives, and maternity hospitals in 17 prefectures and collect payment for condoms distributed after their previous visit. As an incentive, organizations and health institutions receive a commission for the condoms they supply. Japan's largest condom manufacturer provides supplies to the Family Planning Association at a very low price. The contraceptive social marketing program pays for its own promotion, and the Family Planning Association is able to support its other activities from the income it earns. The program was designed to complement rather than compete with commercial marketing channels such as pharmacies, which supply 60% of the 660 million condoms purchased in Japan each year. PMID:12341264

  7. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    SciTech Connect

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required.

  8. UMTRA technical assistance contractor quality assurance program plan

    SciTech Connect

    Not Available

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements.

  9. Operating plan for the Office of International Health Programs

    SciTech Connect

    1996-01-01

    In this report unified ideas are presented about what the Office of International Health Programs does, what the individual contributions are, and how the organization connects to the Department of Energy. The planning efforts have focused on the office`s three areas of responsibility: Europe, Japan, and the Marshall Islands. Common to each technical program area are issues related to the following: health of populations exposed to radiation incidents and the associated medical aspects of exposure; dose reconstruction; training; and public involvement. Each of the program areas, its customers, and primary customer interests are described.

  10. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    SciTech Connect

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  11. The ORNL Surplus Facilities Management Program Long Range Plan

    SciTech Connect

    Myrick, T.E.

    1984-09-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy`s (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 76 individual surplus facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. The ORNL SFMP has prepared this Long Range Plan to outline the long-term management strategy for those facilities included in the program. The primary objective of this plan are to: (1) develop a base of information for each ORNL SFMP facility, (2) conduct preliminary decommissioning analyses to identify feasible alternatives, (3) assess the current and future risk of each facility, (4) establish a priority list for the decommissioning projects, and (5) integrate the individual project costs and schedules into an overall program schedule and cost estimate for the ORNL site. The Long Range Plan also provides an overview of the ORNL SFMP management structure, specifies the decommissioning criteria to be employed, and identifies special technical problems, research and development needs, and special facilities and equipment that may be required for decommissioning operations.

  12. On financial management of population and family planning programs.

    PubMed

    1976-03-01

    In the 3 day workshop of the Southeast Asian Region on the Financial Management of Population/Family Planning Programs held from March 15 to 17 it was recommended that there by standardization of financial reporting procedures by country programs for population planning. Related to this recommendation was the proposal that measurement of cost benefit and cost effective analysis of country programs be undertaken by the Research and Evaluation Units of the respective population organizations in close coordination with the financial managers. Other major recommendations included: 1) closer coordination between donor agencies and policy making bodies of country programs in the disbursement of funds; 2) more exchange of experiences, ideas, technical knowledge on the financial management of country programs in the Inter G overnmental Coordinating Committee for Southeast Asian countries; and 3) inclusion of applicable financial management topics in the training of clinical staff and followup in actual operation. The priority areas identified for the Inter Governmental Coordinating Committee countries (Nepal, Malaysia, Thailand, Singapore, and the Philippines) are financial planning; generation of resources and budgeting and allocation of funds; accounting and disbursement of funds; financial management at the clinic level; use of and control of foreign aid; and cost effectiveness, benefit analysis and financial reporting. PMID:12334205

  13. Puerto Rico water resources planning model program description

    USGS Publications Warehouse

    Moody, D.W.; Maddock, Thomas; Karlinger, M.R.; Lloyd, J.J.

    1973-01-01

    Because the use of the Mathematical Programming System -Extended (MPSX) to solve large linear and mixed integer programs requires the preparation of many input data cards, a matrix generator program to produce the MPSX input data from a much more limited set of data may expedite the use of the mixed integer programming optimization technique. The Model Definition and Control Program (MODCQP) is intended to assist a planner in preparing MPSX input data for the Puerto Rico Water Resources Planning Model. The model utilizes a mixed-integer mathematical program to identify a minimum present cost set of water resources projects (diversions, reservoirs, ground-water fields, desalinization plants, water treatment plants, and inter-basin transfers of water) which will meet a set of future water demands and to determine their sequence of construction. While MODCOP was specifically written to generate MPSX input data for the planning model described in this report, the program can be easily modified to reflect changes in the model's mathematical structure.

  14. Utility Battery Storage Systems Program plan: FY 1994--FY 1998

    SciTech Connect

    Not Available

    1994-02-01

    The Utility Battery Storage Systems Program, sponsored by the US Department of Energy (DOE), is addressing needed improvements so that the full benefits of these systems can be realized. A key element of the Program is the quantification of the benefits of batteries used in utility applications. The analyses of the applications and benefits are ongoing, but preliminary results indicate that the widespread introduction of battery storage by utilities could benefit the US economy by more than $26 billion by 2010 and create thousands of new jobs. Other critical elements of the DOE Program focus on improving the batteries, power electronics, and control subsystems and reducing their costs. These subsystems are then integrated and the systems undergo field evaluation. Finally, the most important element of the Program is the communication of the capabilities and benefits of battery systems to utility companies. Justifiably conservative, utilities must have proven, reliable equipment that is economical before they can adopt new technologies. While several utilities are leading the industry by demonstrating battery systems, a key task of the DOE program is to inform the entire industry of the value, characteristics, and availability of utility battery systems so that knowledgeable decisions can be made regarding future investments. This program plan for the DOE Utility Battery Storage Systems Program describes the technical and programmatic activities needed to bring about the widespread use of batteries by utilities. By following this plan, the DOE anticipates that many of the significant national benefits from battery storage will be achieved in the near future.

  15. Program Risk Planning with Risk as a Resource

    NASA Technical Reports Server (NTRS)

    Ray, Paul S.

    1998-01-01

    The current focus of NASA on cost effective ways of achieving mission objectives has created a demand for a change in the risk management process of a program. At present, there is no guidelines as to when risk taking is justified due to high cost for a marginal improvement in risk. As a remedial step, Dr. Greenfield of NASA, developed a concept of risk management with risk as a resource. In the report, the following topics are addressed: (1) the risk management approach; (2) planning risk and program life cycle; (3) key components of a typical program; (4) the risk trading methodology; (5) review and decision process; (6) merits of the proposed risk planning approach; and (7) recommendations.

  16. Environmental development plan for transportation programs: FY80 update

    SciTech Connect

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  17. An Online Recovery Plan Program: Can Peer Coaching Increase Participation?

    PubMed Central

    Simon, Gregory E.; Cutsogeorge, Dona; Ludman, Evette J.; Operskalski, Belinda; Goodale, Lisa C.; Savarino, James; Dykstra, Donna M.; Pabiniak, Chester; Stone, Elisa

    2014-01-01

    Objective A pilot study evaluated whether the addition of online coaching from a peer specialist increased participation in an online program featuring educational and interactive modules to promote self-management of bipolar disorder. Methods A total of 118 participants with bipolar disorder recruited from online and in-person support groups and clinical settings were enrolled in MyRecoveryPlan. Half the group was randomly assigned to receive online coaching support from a certified peer specialist. Results Participants offered online peer coaching were more likely to return to the program after registration (71% versus 44%, p=.005) and to continue using the program after three weeks (38% versus 9%, p<.001). This pattern was consistent for all program elements. Conclusions The addition of online coaching from a peer specialist significantly increased engagement and retention in the program, but further research is needed to evaluate the program’s effects on clinical and recovery outcomes. PMID:21632737

  18. Lawrence Berkeley Laboratory Self-Assessment Program: Implementation Plan

    SciTech Connect

    Not Available

    1992-06-01

    The Lawrence Berkeley Laboratory (LBL) Self-Assessment Program provides a formal process for assuring quality and regulatory compliance in all facets of Laboratory operations. The program, which integrates the ongoing self-assessment activities of the individual Divisions and Offices in a comprehensive, top-to-bottom process, provides assistance to the US Department of Energy (DOE), the University of California, and Laboratory management in their appraisals of Laboratory performance. This document describes the program goals, scope, responsibilities, elements, and implementation schedule. This document is also the implementation plan for the institutional level self-assessment program. Each Division is also required to develop a self-assessment program that contains the elements described in this document.

  19. Multiyear Program Plan for the High Temperature Materials Laboratory

    SciTech Connect

    Arvid E. Pasto

    2000-03-17

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.

  20. Planned Closeout of the Cf-252 Loan/Lease Program

    SciTech Connect

    Sherman, Steven R; Patton, Bradley D

    2012-09-01

    New funding is sought to pursue planned closeout of the Cf-252 Loan Program. The work will be performed in phases. In the initial phase, users will be surveyed to determine whether they wish to take ownership of sources in their possession, or return them. In the second phase, sources will be recalled from non-DOE entities, and source ownership transfers will be performed. In the third phase, the remaining sources from DOE entities will be recalled. Initial funding of $350K is sought to fund the first phase, and to plan execution of the remaining phases given information collected from user surveys.

  1. ERD UMTRA Project quality assurance program plan, Revision 7

    SciTech Connect

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors.

  2. Geothermal-subsidence research program plan and review

    SciTech Connect

    Goldstein, N.E.; Noble, J.E.; Simkin, T.L.

    1980-09-01

    The revised Geothermal Subsidence Research Plan (GSRP) presented here is the result of two years of research based on the recommendations of a technical advisory committee and on the DOE/DGE's wish to include specific components applicable to the geopressure resources on the Gulf Coast. This revised plan describes events leading up to FY 1979 and 1980 and the resulting research activities completed for that period. At the time of this writing most of the projects are completed; this document summarizes the accomplishments of the GSRP during FY 1979 and 1980 and includes recommendations for the FY 1981 and 1982 programs.

  3. Facilities Planning Guide for Special Education Programs: Planning Accessibility for the Handicapped in Public Schools.

    ERIC Educational Resources Information Center

    Brooks, Kenneth W.

    The guide details characteristics to provide architecturally accessible special education programs for handicapped students. Impetus for the accessibility movement is traced to legislation, including the Architectural Barriers Act and Sections 503 and 504 of the Rehabilitation Act of 1973. Planning features considered are the development of a…

  4. A Guide to Occupational Program Planning Using the HOEPS (Hawaii Occupational Employment Planning System).

    ERIC Educational Resources Information Center

    Stanley, Patrick A.

    This guide is intended to help bridge the gap between the goal of fitting individuals for gainful and satisfying employment and the realities of the labor market which must provide that employment. It provides occupational program planners with simple suggestions on how to incorporate pertinent information into the planning process at minimal cost…

  5. DOE-owned spent nuclear fuel program plan

    SciTech Connect

    1995-11-01

    The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines.

  6. Planning and Implementation of Certificate Programs in Pharmacy: A Review of Six Programs in the Literature.

    ERIC Educational Resources Information Center

    Smith, Jayne L.

    2001-01-01

    Explores planning and implementation issues related to pharmacy certificate programs, including provider collaboration and American Council on Pharmaceutical Education standards in needs assessment, instructional design, and evaluation. Reviewed six recent articles on certificate programs and found good indication that they are meeting high…

  7. Guidelines for Occupational Program Planning. Evaluation Handbook. California Guidelines for Modifying and Terminating Occupational Programs.

    ERIC Educational Resources Information Center

    Holcomb, Robert E.; And Others

    The primary emphasis of this handbook is upon occupational program evaluation, particularly as it relates to modification and termination. It is the result of a series of nine workshops whose purpose was to review and improve Guidelines for Occupational Program Planning (ED 143 404) written in 1977. A basic flow chart is presented with specific…

  8. Career Planning Programs for Women Employees: Prototype Programs. Research and Development Series No. 137.

    ERIC Educational Resources Information Center

    Vetter, Louise; And Others

    A project was conducted to develop three prototype comprehensive career planning programs and to offer those prototypes as models that could be used by both educators and personnel directors who are interested in helping employed women improve their occupational status. A national survey of programs in operation in community and junior colleges…

  9. 10 CFR 905.1 - What are the purposes of the Energy Planning and Management Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What are the purposes of the Energy Planning and Management Program? 905.1 Section 905.1 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM General Provisions § 905.1 What are the purposes of the Energy Planning and Management Program? The purposes of the Energy Planning and...

  10. Program-Level Curriculum Planning: An Exploration of Faculty Perspectives on Two Different Campuses.

    ERIC Educational Resources Information Center

    Stark, Joan S.; And Others

    1997-01-01

    A survey of 59 faculty at two very different colleges investigated assumptions and influences on them as they worked with colleagues in planning program curriculum. While some common factors influenced course and program planning, program planning was irregular or infrequent compared to course planning, typically responded to a specific catalyst,…

  11. Statewide Strategic Forest Resource Planning Programs: Evaluation Based on Context, Process, Outputs, and Performance.

    ERIC Educational Resources Information Center

    Gray, Gerald J.; Ellefson, Paul V.

    1991-01-01

    Evaluation of strategic planning programs is illustrated using the examples of statewide forest resource planning programs implemented by state governments in 1986. Client-based perspectives were studied via a survey of 216 officials affected by the forestry planning program. Considering planning's context, process, outputs, and performance helped…

  12. Formulating the Program Implementation Plan and Securing and Allocating Resources. Systematic Planning Series for Local Education Agencies. Monograph Number 6.

    ERIC Educational Resources Information Center

    Boone, Lee; And Others

    Preparation and use of a written plan can increase the chance that people will do what has been planned using the ways selected and specified during the planning process. Program implementation plans should include the following elements: a review of product objectives and strategies; a statement of activities involved in meeting product…

  13. Budget FY 1996 Site Support Program Plan: WBS 6.10.1. Revision 1

    SciTech Connect

    Wemhoff, G.M.

    1995-09-01

    This is the budget site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance baseline schedule, cost baseline by month, and the program funding required.

  14. Laser programs facility management plan for environment, safety, and health

    SciTech Connect

    Cruz, G.E.

    1996-01-01

    The Lawrence Livermore National Laboratory`s (LLNL) Laser Programs ES&H policy is established by the Associate Director for Laser Programs. This FMP is one component of that policy. Laser Programs personnel design, construct and operate research and development equipment located in various Livermore and Site 300 buildings. The Programs include a variety of activities, primarily laser research and development, inertial confinement fusion, isotope separation, and an increasing emphasis on materials processing, imaging systems, and signal analysis. This FMP is a formal statement of responsibilities and controls to assure operational activities are conducted without harm to employees, the general public, or the environment. This plan identifies the hazards associated with operating a large research and development facility and is a vehicle to control and mitigate those hazards. Hazards include, but are not limited to: laser beams, hazardous and radioactive materials, criticality, ionizing radiation or x rays, high-voltage electrical equipment, chemicals, and powered machinery.

  15. Self-assessment program implementation plan. Revision A

    SciTech Connect

    Quets, A.L.

    1991-10-23

    This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

  16. 32 CFR 34.15 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Post-award Requirements Financial and Program Management § 34.15 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the... 32 National Defense 1 2010-07-01 2010-07-01 false Revision of budget and program plans....

  17. 32 CFR 34.15 - Revision of budget and program plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Revision of budget and program plans. 34.15... Post-award Requirements Financial and Program Management § 34.15 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during...

  18. Hanford Surplus Facilities Program plan, Fiscal year 1991

    SciTech Connect

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1990-09-01

    The Hanford Surplus Facilities Program is responsible for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The management of these facilities requires a surveillance and maintenance program to keep them in a safe condition and development of a plan for ultimate disposition. Criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy-Richland Operations Office, Environmental Restoration Division, and are consistent with the Westinghouse Hanford Company commitment to decommission the Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities to the end of disposition. 12 refs., 2 figs., 4 tabs.

  19. DOE Region 6 Radiological Assistance Program plan. Revision 1

    SciTech Connect

    Jakubowski, F.M.

    1995-11-01

    The US Department of Energy (DOE) has sponsored a Radiological Assistance Program (RAP) since the 1950`s. The RAP is designed to make DOE resources available to other DOE facilities, state, tribal, local, private businesses, and individuals for the explicit purpose of assisting during radiological incidents. The DOE has an obligation, through the Atomic Energy Act of 1954, as amended, to provide resources through the Federal Radiological Emergency Response Plan (FRERP, Nov. 1985) in the event of a radiological incident. Toward this end, the RAP program is implemented on a regional basis, and has planned for an incremental response capability with regional coordination between states and DOE response elements. This regional coordination is intended to foster a working relationship between DOE radiological assistance elements and those state, tribal, and local agencies responsible for first response to protect public health and safety.

  20. UMTRA Project Office quality assurance program plan. Revision 6

    SciTech Connect

    Not Available

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors.

  1. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect

    Washington TRU Solutions

    2002-09-24

    U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

  2. National Ignition Facility quality assurance program plan revision 2

    SciTech Connect

    Wolfe, C R

    1998-06-01

    NIF Project activities will be conducted in a manner consistent with the guidance and direction of the DOE Order on Quality Assurance (414.1), the LLNL QA Program, and the Laser Directorate QA Plan. Quality assurance criteria will be applied in a graded manner to achieve a balance between the rigor of application of QA measures and the scale, cost, and complexity of the work involved. Accountability for quality is everyone's, extending from the Project Manager through established lines of authority to all Project personnel, who are responsible for the requisite quality of their own work. The NLF QA Program will be implemented by personnel conducting their activities to meet requirements and expectations, according to established plans and procedures that reflect the way business is to be conducted on the Project.

  3. Path planning for complex terrain navigation via dynamic programming

    SciTech Connect

    Kwok, K.S.; Driessen, B.J.

    1998-12-31

    This work considers the problem of planning optimal paths for a mobile robot traversing complex terrain. In addition to the existing obstacles, locations in the terrain where the slope is too steep for the mobile robot to navigate safely without tipping over become mathematically equivalent to extra obstacles. To solve the optimal path problem, the authors use a dynamic programming approach. The dynamic programming approach utilized herein does not suffer the difficulties associated with spurious local minima that the artificial potential field approaches do. In fact, a globally optimal solution is guaranteed to be found if a feasible solution exists. The method is demonstrated on several complex examples including very complex terrains.

  4. Access 5 - Step 1: Human Systems Integration Program Plan (HSIPP)

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This report describes the Human System Interface (HSI) analysis, design and test activities that will be performed to support the development of requirements and design guidelines to facilitate the incorporation of High Altitude Long Endurance (HALE) Remotely Operated Aircraft (ROA) at or above FL400 in the National Airspace System (NAS). These activities are required to support the design and development of safe, effective and reliable ROA operator and ATC interfaces. This plan focuses on the activities to be completed for Step 1 of the ACCESS 5 program. Updates to this document will be made for each of the four ACCESS 5 program steps.

  5. Variable Cycle Engine Technology Program Planning and Definition Study

    NASA Technical Reports Server (NTRS)

    Westmoreland, J. S.; Stern, A. M.

    1978-01-01

    The variable stream control engine, VSCE-502B, was selected as the base engine, with the inverted flow engine concept selected as a backup. Critical component technologies were identified, and technology programs were formulated. Several engine configurations were defined on a preliminary basis to serve as demonstration vehicles for the various technologies. The different configurations present compromises in cost, technical risk, and technology return. Plans for possible variably cycle engine technology programs were formulated by synthesizing the technology requirements with the different demonstrator configurations.

  6. Program plan for the Modular Integrated Video System

    SciTech Connect

    Gaertner, K.J.; Heaysman, B.; Holt, R.; Sonnier, C.

    1986-01-01

    The Modular Integrated Video System (MIVS) is intended to provide a simple, highly reliable CCTV system capable of replacing the IAEA Twin Minolta Film Camera Systems in (l) those safeguarded facilities where main power is readily available, and (2) situations where it is desired to have the CCTV camera separated from the CCTV recording console. The principal steps of the program plan for development and implementation of this system are described. The IAEA and developer responsibilities throughout this process are also described.

  7. Nurse manager residency program: an innovative leadership succession plan.

    PubMed

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence. PMID:24704735

  8. The Philippine Population Program strategic plan (1981-1985).

    PubMed

    1980-01-01

    The challenge of the population problem is to effectively mobilize the country's population for productive activity. Rather than simply concern with controlling numbers, emphasis is on human resource management, the structure of employment, labor productivity and income distribution. The long-term Philippine Development Plans reflect recognition of the dynamic interaction between fertility, productivity and welfare. Objectives of the 5-Year Philippine Development Plan 1978-1982, the 10-Year Plan 1978-1987, and the Long-Term Plan to year 2000 integrate population concerns and socioeconomic goals. These objectives include the following: promotion of social development and social justice; attainment of self-sufficiency in food and greater self-reliance in energy; increased development of lagging regions, especially rural areas; improvements of habitat through the development of human settlements and proper management of the environment; and maintenance of population growth at levels conducive to national welfare. Some population concerns that are directly relevant to welfare (in addition to those related to productivity) are distribution patterns of social goods and services, access to services by sectors of the population, and buying power of families. As a total population policy should establish closer linkages, operationally, between the demographic aspects and the productivity and welfare aspects of development, the mission of the National Population Program encompasses 3 areas: fertility; productivity; and welfare. Strategic policies include the following: abortion is unacceptable as a contraceptive method; the population program shall be non-coercive; and the program shall view individual and family welfare in the context and as the main objective of national socioeconomic programs. PMID:12337599

  9. Program plan to develop airworthiness standards for STOL aircraft

    NASA Technical Reports Server (NTRS)

    Cayot, J. E.; Chubboy, R. A.; Hynes, C. S.

    1972-01-01

    A program plan to develop criteria for airworthiness standards for STOL transport aircraft is presented. Initially, three different STOL concepts are to be examined with a goal to arrive at a generalized set of standards. The Breguet 941 deflected-slipstream STOL has been initially evaluated on a piloted motion simulator and in flight. Confidence in establishing criteria for airworthiness standards for STOL transport aircraft has been obtained from these studies.

  10. Developing the Learning Door: a case study in youth participatory program planning.

    PubMed

    Randolph, Justus J; Eronen, Pasi J

    2007-02-01

    This article presents the results of a case study in youth participatory program planning conducted in the context of a nonformal technology-education program in eastern Finland. The purpose of the program was to have youth, university, and business stakeholders work together to create the Learning Door, a door that would meet the needs of older people and people with disabilities. The participatory program planning process that was used involved clarifying the mission, roles, and modes of collaboration as well as creating stakeholder matrices, logic models, program plans, and implementation plans. It was found that the observed program planning process was similar to the intended planning process and that the process was well received by the planning participants. The lessons learned include clarifying the nature of collaboration before the program gets underway, reviewing program planning steps often, and making clear distinctions between logic models and implementations plans. PMID:17689313

  11. Fish Processed Production Planning Using Integer Stochastic Programming Model

    NASA Astrophysics Data System (ADS)

    Firmansyah, Mawengkang, Herman

    2011-06-01

    Fish and its processed products are the most affordable source of animal protein in the diet of most people in Indonesia. The goal in production planning is to meet customer demand over a fixed time horizon divided into planning periods by optimizing the trade-off between economic objectives such as production cost and customer satisfaction level. The major decisions are production and inventory levels for each product and the number of workforce in each planning period. In this paper we consider the management of small scale traditional business at North Sumatera Province which performs processing fish into several local seafood products. The inherent uncertainty of data (e.g. demand, fish availability), together with the sequential evolution of data over time leads the production planning problem to a nonlinear mixed-integer stochastic programming model. We use scenario generation based approach and feasible neighborhood search for solving the model. The results which show the amount of each fish processed product and the number of workforce needed in each horizon planning are presented.

  12. Verification and Planning Based on Coinductive Logic Programming

    NASA Technical Reports Server (NTRS)

    Bansal, Ajay; Min, Richard; Simon, Luke; Mallya, Ajay; Gupta, Gopal

    2008-01-01

    Coinduction is a powerful technique for reasoning about unfounded sets, unbounded structures, infinite automata, and interactive computations [6]. Where induction corresponds to least fixed point's semantics, coinduction corresponds to greatest fixed point semantics. Recently coinduction has been incorporated into logic programming and an elegant operational semantics developed for it [11, 12]. This operational semantics is the greatest fix point counterpart of SLD resolution (SLD resolution imparts operational semantics to least fix point based computations) and is termed co- SLD resolution. In co-SLD resolution, a predicate goal p( t) succeeds if it unifies with one of its ancestor calls. In addition, rational infinite terms are allowed as arguments of predicates. Infinite terms are represented as solutions to unification equations and the occurs check is omitted during the unification process. Coinductive Logic Programming (Co-LP) and Co-SLD resolution can be used to elegantly perform model checking and planning. A combined SLD and Co-SLD resolution based LP system forms the common basis for planning, scheduling, verification, model checking, and constraint solving [9, 4]. This is achieved by amalgamating SLD resolution, co-SLD resolution, and constraint logic programming [13] in a single logic programming system. Given that parallelism in logic programs can be implicitly exploited [8], complex, compute-intensive applications (planning, scheduling, model checking, etc.) can be executed in parallel on multi-core machines. Parallel execution can result in speed-ups as well as in larger instances of the problems being solved. In the remainder we elaborate on (i) how planning can be elegantly and efficiently performed under real-time constraints, (ii) how real-time systems can be elegantly and efficiently model- checked, as well as (iii) how hybrid systems can be verified in a combined system with both co-SLD and SLD resolution. Implementations of co-SLD resolution

  13. Report of the Integrated Program Planning Activity for the DOE Fusion Energy Sciences Program

    SciTech Connect

    2000-12-01

    This report of the Integrated Program Planning Activity (IPPA) has been prepared in response to a recommendation by the Secretary of Energy Advisory Board that, ''Given the complex nature of the fusion effort, an integrated program planning process is an absolute necessity.'' We, therefore, undertook this activity in order to integrate the various elements of the program, to improve communication and performance accountability across the program, and to show the inter-connectedness and inter-dependency of the diverse parts of the national fusion energy sciences program. This report is based on the September 1999 Fusion Energy Sciences Advisory Committee's (FESAC) report ''Priorities and Balance within the Fusion Energy Sciences Program''. In its December 5,2000, letter to the Director of the Office of Science, the FESAC has reaffirmed the validity of the September 1999 report and stated that the IPPA presents a framework and process to guide the achievement of the 5-year goals listed in the 1999 report. The National Research Council's (NRC) Fusion Assessment Committee draft final report ''An Assessment of the Department of Energy's Office of Fusion Energy Sciences Program'', reviewing the quality of the science in the program, was made available after the IPPA report had been completed. The IPPA report is, nevertheless, consistent with the recommendations in the NRC report. In addition to program goals and the related 5-year, 10-year, and 15-year objectives, this report elaborates on the scientific issues associated with each of these objectives. The report also makes clear the relationships among the various program elements, and cites these relationships as the reason why integrated program planning is essential. In particular, while focusing on the science conducted by the program, the report addresses the important balances between the science and energy goals of the program, between the MFE and IFE approaches, and between the domestic and international aspects

  14. SNL/CA Environmental Planning and Ecology Program Annual Report 2007.

    SciTech Connect

    Larsen, Barbara L.

    2007-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  15. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    SciTech Connect

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  16. Research and Development Program Plan for Geopressure-Geothermal Resources

    SciTech Connect

    1980-12-01

    The objective of the Geopressure-Geothermal Program of the Division of Geothermal Energy, U.S. Department of Energy, is to determine by the end of FY86 the magnitude and economic potential of the geopressure-geothermal resources. This Program Plan describes how the Department of Energy proposes to achieve this objective. The main purposes of the current program are to narrow the range of uncertainty on the potential recovery of energy from the geopressure-geothermal resources and to ensure the timely development of these resources as the potential is demonstrated. For these purposes, the Division of Geothermal Energy has established the following objectives: (1) Define the magnitude, potential, and economics of the resources. (2) Conduct supporting research on reservoir and fluid characteristics. (3) Adapt or develop downhole, surface, and disposal technology. (4) Identify and mitigate adverse environmental, legal, and institutional issues in order to promote commercialization.

  17. NASA's Next Generation Launch Technology Program - Strategy and Plans

    NASA Technical Reports Server (NTRS)

    Hueter, Uwe

    2003-01-01

    The National Aeronautics and Space Administration established a new program office, Next Generation Launch Technology (NGLT) Program Office, last year to pursue technologies for future space launch systems. NGLT will fund research in key technology areas such as propulsion, launch vehicles, operations and system analyses. NGLT is part of NASA s Integrated Space Technology Plan. The NGLT Program is sponsored by NASA s Office of Aerospace Technology and is part of the Space Launch Initiative theme that includes both NGLT and Orbital Space Plane. NGLT will focus on technology development to increase safety and reliability and reduce overall costs associated with building, flying and maintaining the nation s next-generations of space launch vehicles. These investments will be guided by systems engineering and analysis with a focus on the needs of National customers.

  18. Superconductivity for electric systems program plan, FY 1996--FY 2000

    SciTech Connect

    1996-03-01

    This describes a comprehensive, integrated approach for the development of HTS (high-temperature superconductivity) technology for cost-effective use in electric power applications. This approach supports the program`s mission: to develop the technology that could lead to industrial commercialization of HTS electric power applications, such as fault-current limiters, motors, generators, transmission cables, superinductors, and superconducting energy storage. The vision is that, by 2010, the US power systems equipment industry will regain a major share of the global market by offering superconducting products that outperform the competition; and in US, the power grid will gain increased efficiency and stability by incorporating many kinds of HTS devices. After an overview and a discussion of the program plan (wires, systems technology, partnership initiative), this document discusses technology status, stakeholders, and the role of US DOE.

  19. Proceedings of the DOE solar thermal technology program planning workshop

    SciTech Connect

    Radosevich, L.G.

    1982-03-01

    The workshop reviewed several strategies for solar thermal technology program planning. After the strategy options were presented to the workshop participants, each committee (user/supplier, system test and evaluation, technology development, and research) was asked to address the following issues: which strategy shows the best potential for meeting the objectives of the solar thermal program; is there an obvious imbalance in the program in terms of emphasis in various areas; are there any activities which should be added or deleted; and, if a funding cut occurs, how should the cut be made. The strategy options are briefly discussed. Summary reports from each committee follow, and a compilation of the committee findings highlights major similarities and differences. (LEW)

  20. Planning for a smooth transition: evaluation of a succession planning program for prospective nurse unit managers.

    PubMed

    Manning, Vicki; Jones, Alan; Jones, Pamela; Fernandez, Ritin S

    2015-01-01

    The current and projected nurse workforce shortage has created significant pressure on health care organizations to examine their approach to managing talent. This includes the need for strategic development of new formal leaders. This article reports on a succession planning program for prospective nursing unit managers. Eight prospective management candidates participated in a Future Nursing Unit Managers program. The effectiveness of the program was measured through a comparison of pre- and postprogram surveys relating to participants' perception of personal managerial and leadership skills. Significant differences in scores from baseline to 6-month follow-up surveys were observed in the participants' confidence in undertaking the nursing unit manager role and in their management skills. Investment in structured programs to prepare nurses for leadership roles is strongly recommended as a management workforce strategy. PMID:25474668

  1. Systems autonomy technology: Executive summary and program plan

    NASA Technical Reports Server (NTRS)

    Bull, John S (Editor)

    1987-01-01

    The National Space Strategy approved by the President and Congress in 1984 sets for NASA a major goal of conducting effective and productive space applications and technology programs which contribute materially toward United States leadership and security. To contribute to this goal, OAST supports the Nation's civil and defense space programs and overall economic growth. OAST objectives are to ensure timely provision of new concepts and advanced technologies, to support both the development of NASA missions in space and the space activities of industry and other organizations, to utilize the strengths of universities in conducting the NASA space research and technology program, and to maintain the NASA centers in positions of strength in critical space technology areas. In line with these objectives, NASA has established a new program in space automation and robotics that will result in the development and transfer and automation technology to increase the capabilities, productivity, and safety of NASA space programs including the Space Station, automated space platforms, lunar bases, Mars missions, and other deep space ventures. The NASA/OAST Automation and Robotics program is divided into two parts. Ames Research Center has the lead role in developing and demonstrating System Autonomy capabilities for space systems that need to make their own decisions and do their own planning. The Jet Propulsion Laboratory has the lead role for Telerobotics (that portion of the program that has a strong human operator component in the control loop and some remote handling requirement in space). This program is intended to be a working document for NASA Headquarters, Program Offices, and implementing Project Management.

  2. Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2

    SciTech Connect

    Not Available

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.

  3. Data Quality Assurance Program Plan for NRC Division of Risk Analysis Programs at the INL

    SciTech Connect

    Sattison, Martin B.; Wierman, Thomas E.; Vedros, Kurt G.; Germain, Shawn W. St.; Eide, Steven A.; Sant, Robert L.

    2009-07-01

    The Division of Risk Analysis (DRA), Office of Nuclear Regulatory Research (RES), must ensure that the quality of the data that feed into its programs follow Office of Management and Budget (OMB) and U.S. Nuclear Regulatory Commission (NRC) guidelines and possibly other standards and guidelines used in nuclear power plant risk analyses. This report documents the steps taken in DRA’s Data Quality Improvement project (Job Control Number N6145) to develop a Data Quality Assurance Program Plan. These steps were 1. Conduct a review of data quality requirements 2. Review current data programs, products, and data quality control activities 3. Review the Institute of Nuclear Power Operation (INPO) Equipment Performance and Information Exchange (EPIX) data quality programs and characterize the EPIX data quality and uncertainty 4. Compare these programs, products, and activities against the requirements 5. Develop a program plan that provides assurance that data quality is being maintained. It is expected that the Data Quality Assurance Program Plan will be routinely implemented in all aspects of future data collection and processing efforts and that specific portions will be executed annually to provide assurance that data quality is being maintained.

  4. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  5. Quality Assurance Program Plan for AGR Fuel Development and Qualification Program

    SciTech Connect

    W. Ken Sowder

    2004-02-01

    Quality Assurance Plan (QPP) is to document the Idaho National Engineering and Environmental Laboratory (INEEL) Management and Operating (M&O) Contractor’s quality assurance program for AGR Fuel Development and Qualification activities, which is under the control of the INEEL. The QPP is an integral part of the Gen IV Program Execution Plan (PEP) and establishes the set of management controls for those systems, structures and components (SSCs) and related quality affecting activities, necessary to provide adequate confidence that items will perform satisfactorily in service.

  6. 75 FR 60465 - Division of Program Coordination, Planning, and Strategic Initiatives, Office of the Director...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Division of Program Coordination, Planning, and Strategic... Secretary, Division of Program Coordination, Planning, and Strategic Initiatives, Office of the...

  7. 75 FR 35076 - Division of Program Coordination, Planning, and Strategic Initiatives, Office of the Director...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Division of Program Coordination, Planning, and Strategic... Deputy Director, Division of Program Coordination, Planning, and Strategic Initiatives, Office of...

  8. 75 FR 417 - National Protection and Programs Directorate; Statewide Communication Interoperability Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... SECURITY National Protection and Programs Directorate; Statewide Communication Interoperability Plan...: Statewide Communication Interoperability Plan Implementation Report. Form: Not Applicable. OMB Number: 1670... Emergency Communications Grant Program (IECGP) (6 U.S.C. 579) comply with the Statewide...

  9. Solid waste operations complex engineering verification program plan

    SciTech Connect

    Bergeson, C.L.

    1994-09-28

    This plan supersedes, but does not replace, the previous Waste Receiving and Processing/Solid Waste Engineering Development Program Plan. In doing this, it does not repeat the basic definitions of the various types or classes of development activities nor provide the rigorous written description of each facility and assign the equipment to development classes. The methodology described in the previous document is still valid and was used to determine the types of verification efforts required. This Engineering Verification Program Plan will be updated on a yearly basis. This EVPP provides programmatic definition of all engineering verification activities for the following SWOC projects: (1) Project W-026 - Waste Receiving and Processing Facility Module 1; (2) Project W-100 - Waste Receiving and Processing Facility Module 2A; (3) Project W-112 - Phase V Storage Facility; and (4) Project W-113 - Solid Waste Retrieval. No engineering verification activities are defined for Project W-112 as no verification work was identified. The Acceptance Test Procedures/Operational Test Procedures will be part of each project`s Title III operation test efforts. The ATPs/OTPs are not covered by this EVPP.

  10. A Handbook for Institutional Academic and Program Planning: From Idea to Implementation.

    ERIC Educational Resources Information Center

    Kieft, Raymond N.; And Others

    Planning activities at higher education institutions should be comprehensive, program based, and long-range. The daily process of planning and the necessity of integrating planning and resource allocation into a single system are emphasized in this handbook, which deals only with centralized planning activities. The focus is on program merit, not…

  11. 10 CFR 600.315 - Revision of budget and program plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Revision of budget and program plans. 600.315 Section 600... Requirements § 600.315 Revision of budget and program plans. (a) The budget plan is the financial expression of... non-Federal shares when there are cost sharing requirements. The budget plan must be related...

  12. SPADE: A Grammar Based Editor for Planning and Debugging Programs. AI Memo 386.

    ERIC Educational Resources Information Center

    Miller, Mark L.; Goldstein, Ira P.

    The Structured Planning and Debugging Editor (SPADE) is a new kind of interactive programming environment in which computer programs are generated by explicitly articulating planning decisions. The design of SPADE is based upon the development of a grammar of plans from a taxonomy of basic planning techniques. The utility of this approach to…

  13. Developing and Implementing Training Plans. Module Number 8. Work Experience Program Modules. Coordination Techniques Series.

    ERIC Educational Resources Information Center

    Burrow, Jim

    This self-instructional module, the eighth in a series of 16 on techniques for coordinating work experience programs, deals with developing and implementing training plans. Addressed in the module are the purposes and features of a training plan, developing a training plan, and implementing a training plan for each student in the program. The…

  14. Orbital rendezvous mission planning using mixed integer nonlinear programming

    NASA Astrophysics Data System (ADS)

    Zhang, Jin; Tang, Guo-jin; Luo, Ya-Zhong; Li, Hai-yang

    2011-04-01

    The rendezvous and docking mission is usually divided into several phases, and the mission planning is performed phase by phase. A new planning method using mixed integer nonlinear programming, which investigates single phase parameters and phase connecting parameters simultaneously, is proposed to improve the rendezvous mission's overall performance. The design variables are composed of integers and continuous-valued numbers. The integer part consists of the parameters for station-keeping and sensor-switching, the number of maneuvers in each rendezvous phase and the number of repeating periods to start the rendezvous mission. The continuous part consists of the orbital transfer time and the station-keeping duration. The objective function is a combination of the propellant consumed, the sun angle which represents the power available, and the terminal precision of each rendezvous phase. The operational requirements for the spacecraft-ground communication, sun illumination and the sensor transition are considered. The simple genetic algorithm, which is a combination of the integer-coded and real-coded genetic algorithm, is chosen to obtain the optimal solution. A practical rendezvous mission planning problem is solved by the proposed method. The results show that the method proposed can solve the integral rendezvous mission planning problem effectively, and the solution obtained can satisfy the operational constraints and has a good overall performance.

  15. Risk communications and the Chemical Stockpile Emergency-Planning Program

    SciTech Connect

    Vogt, B.M.; Sorensen, J.H.

    1994-09-01

    The CSEPP (Chemical Stockpile Emergency Preparedness Program) was created to improve emergency planning and response capabilities at the eight sites around the country that store chemical weapons. These weapons are scheduled to be destroyed in the near future. In preparation of the Draft Programmatic Environmental Impact Statement (DPEIS) for the Chemical Stockpile Disposal Program (CSDP), it was proposed that the Army mitigate accidents through an enhanced community emergency preparedness program at the eight storage sites. In 1986, the Army initiated the development of an Emergency Response Concept Plan (ERCP) for the CSDP, one of 12 technical support studies conducted during preparation of the Final Programmatic Environmental Impact Statement (FPEIS). The purpose of this document is to provide a fairly comprehensive source book on risk, risk management, risk communication research and recommended risk communication practices. It does not merely summarize each publication in the risk communication literature, but attempts to synthesize them along the lines of a set of organizing principles. Furthermore, it is not intended to duplicate other guidance manuals (such as Covello et al.`s manual on risk comparison). The source book was developed for the CSEPP in support of the training module on risk communications. Although the examples provided are specific to CSEPP, its use goes beyond that of CSEPP as the findings apply to a broad spectrum of risk communication topics. While the emphasis is on communication in emergency preparedness and response specific to the CSEPP, the materials cover other non-emergency communication settings. 329 refs.

  16. Single-shell tank systems technical support program plan

    SciTech Connect

    Klem, M.J.; Golberg, C.E.; Gibby, R.D.; Giese, K.A.; Ruck, F.A.; Sonnichsen, J.C.; Wanner, D.D.; Wing, N.R.; Woodworth, K.A. ); Fletcher, J.F. )

    1990-06-01

    This Single-Shell Tank Systems Technical Support Program Plan (TSPP) provides documentation of the required technology, resources, equipment, program funding, and plans for closure of the six single-shell tank (SST) operable units (OU). The SST OUs comprise treatment, storage, and disposal units (wastes, tanks, and soil contaminated by leaks) and past practice units (ancillary units and soil contaminated by spills). A systems engineering approach is being used as a management tool to assist in reaching a final disposal decision for the SST OUs. The systems approach is a structured process to define and solve a problem. It is useful for large programs that involve multiple scientific and engineering disciplines and span long time periods. The systems approach ensures that development activities are conducted in an integrated, efficient, thorough, logical, defensible, auditable, and verifiable manner. It will allow the US Department of Energy to meet Hanford Federal Facility Agreement and Consent Order milestones and develop the technology required for the supplemental environmental impact statement for SST waste. 19 refs., 41 figs., 46 tabs.

  17. National Program Plan Fuel Cells in Transportation. Executive Summary

    SciTech Connect

    Not Available

    1993-02-01

    Fuel cells are being developed for application in the transportation sector because they will convert hydrogen to electric power at high efficiencies with virtually no detrimental environmental impact. To realize these energy, environmental, and economic benefits, developers of FCVs need to (1) reduce the size and weight of current designs, (2) develop fuel cell propulsion systems with rapid start-up and greater load-following capability, (3) reduce system cost and/or improve performance, and (4) utilize alternative fuels to a large extent. This Plan addresses the FCV-related requirements of the Energy Act, describing a development program for light- and heavy-duty propulsion systems, a basic R&D program on fuel cell technology that is separate from, but feeds into, the system development activities, and supporting analyses. Implementation of the Program Plan by means of industry/government alliances will accelerate the commercialization of FCVs. In the long term, the successful deployment of large numbers of FCVs promises to eliminate the transportation sector as a major contributor to the nation`s environmental problems.

  18. Tank waste remediation system vadose zone program plan

    SciTech Connect

    Fredenburg, E.A.

    1998-07-27

    The objective of the vadose zone characterization under this program is to develop a better conceptual geohydrologic model of identified tank farms which will be characterized so that threats to human health and the environment from past leaks and spills, intentional liquid discharges, potential future leaks during retrieval, and from residual contaminants that may remain in tank farms at closure can be explicitly addressed in decision processes. This model will include geologic, hydrologic, and hydrochemical parameters as defined by the requirements of each of the TWRS programs identified here. The intent of this TWRS Vadose Zone Program Plan is to provide justification and an implementation plan for the following activities: Develop a sufficient understanding of subsurface conditions and transport processes to support decisions on management, cleanup, and containment of past leaks, spills, and intentional liquid discharges; Develop a sufficient understanding of transport processes to support decisions on controlling potential retrieval leaks; Develop a sufficient understanding of transport processes to support decisions on tank farm closure, including allowable residual waste that may remain at closure; and Provide new information on geotechnical properties in the 200 Area to supplement data used for design and performance assessment for immobilized low-activity waste disposal facilities.

  19. Human Research Program Integrated Research Plan. Revision C

    NASA Technical Reports Server (NTRS)

    Steinberg, Susan

    2011-01-01

    Crew health and performance are critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes (1) HRP's approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and (2) the method of integration for risk mitigation. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  20. A methodology for comprehensive strategic planning and program prioritization

    NASA Astrophysics Data System (ADS)

    Raczynski, Christopher Michael

    2008-10-01

    This process developed in this work, Strategy Optimization for the Allocation of Resources (SOAR), is a strategic planning methodology based off Integrated Product and Process Development and systems engineering techniques. Utilizing a top down approach, the process starts with the creation of the organization vision and its measures of effectiveness. These measures are prioritized based on their application to external world scenarios which will frame the future. The programs which will be used to accomplish this vision are identified by decomposing the problem. Information is gathered on the programs as to the application, cost, schedule, risk, and other pertinent information. The relationships between the levels of the hierarchy are mapped utilizing subject matter experts. These connections are then utilized to determine the overall benefit of the programs to the vision of the organization. Through a Multi-Objective Genetic Algorithm a tradespace of potential program portfolios can be created amongst which the decision maker can allocate resources. The information and portfolios are presented to the decision maker through the use of a Decision Support System which collects and visualizes all the data in a single location. This methodology was tested utilizing a science and technology planning exercise conducted by the United States Navy. A thorough decomposition was defined and technology programs identified which had the potential to provide benefit to the vision. The prioritization of the top level capabilities was performed through the use of a rank ordering scheme and a previous naval application was used to demonstrate a cumulative voting scheme. Voting was performed utilizing the Nominal Group Technique to capture the relationships between the levels of the hierarchy. Interrelationships between the technologies were identified and a MOGA was utilized to optimize portfolios with respect to these constraints and information was placed in a DSS. This

  1. National program plan for electric vehicle battery research and development

    SciTech Connect

    Henriksen, G.L.; Douglas, D.L.; Warde, C.J.; Douglas , Inc., Bloomington, MN; Warde Associates, Inc., Greensboro, NC )

    1989-08-01

    EVs offer the prospect of reducing US petroleum fuel usage and air pollution in major metropolitan areas. In 1987, DOE-EHP commissioned a two-phase study at INEL to produce a national plan for R D on battery technology -- the limiting component in EVs. The battery assessment phase identified the most-promising'' technologies from a comprehensive list of viable EV batteries. This multi-year R D program plan identifies development schedules, milestones, and tasks directed at resolving the critical technical and economic issues for the most-promising developmental batteries: bipolar lead/acid, flow-through lead/acid, iron/air, lithium/iron sulfide, nickel/iron, sodium/metal chloride, sodium/sulfur, zinc/air, and zinc/bromine. 8 refs., 1 fig., 6 tabs.

  2. Beyond Instruction. Comprehensive Program Planning for Business and Education. Jossey-Bass Business and Management Series.

    ERIC Educational Resources Information Center

    Rothwell, William J.; Cookson, Peter S.

    This book introduces key issues in program planning as practiced in business and educational settings. Two chapters in part 1 introduce two foundational models--Lifelong Education Program Planning (LEPP) model and Contingency-Based Program Planning--and provide background on models designed by Houle, Knowles, Boyle, and Nadler. Parts 2-5 focus on…

  3. 10 CFR 420.15 - Minimum criteria for required program activities for plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Minimum criteria for required program activities for plans. 420.15 Section 420.15 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION STATE ENERGY PROGRAM Formula Grant Procedures § 420.15 Minimum criteria for required program activities for plans. A plan shall satisfy all of the following minimum criteria...

  4. Program Planning for the Training and Continuing Education of Adults: North American Perspectives.

    ERIC Educational Resources Information Center

    Cookson, Peter S., Ed.

    This book provides an overview of program planning for adult learning from philosophical and pedagogical perspectives. It contains 19 papers and an introduction by the editor, Peter S. Cookson. The following are included: "A Conceptual Context for Program Planning" (Peter S. Cookson); "Prototypical Program Planning Models"--"Houle's Fundamental…

  5. 49 CFR 659.17 - System safety program plan: general requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System safety program plan: general requirements... Role of the State Oversight Agency § 659.17 System safety program plan: general requirements. (a) The...) The oversight agency shall review and approve the rail transit agency system safety program plan....

  6. 49 CFR 659.17 - System safety program plan: general requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false System safety program plan: general requirements... Role of the State Oversight Agency § 659.17 System safety program plan: general requirements. (a) The...) The oversight agency shall review and approve the rail transit agency system safety program plan....

  7. Y-12 Site environmental protection program implementation plan (EPPIP)

    SciTech Connect

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  8. HTGR Spent Fuel Treatment Program. HTGR Spent Fuel Treatment Development Program Plan

    SciTech Connect

    Not Available

    1984-12-01

    The spent fuel treatment (SFT) program plan addresses spent fuel volume reduction, packaging, storage, transportation, fuel recovery, and disposal to meet the needs of the HTGR Lead Plant and follow-on plants. In the near term, fuel refabrication will be addressed by following developments in fresh fuel fabrication and will be developed in the long term as decisions on the alternatives dictate. The formulation of this revised program plan considered the implications of the Nuclear Waste Policy Act of 1982 (NWPA) which, for the first time, established a definitive national policy for management and disposal of nuclear wastes. Although the primary intent of the program is to address technical issues, the divergence between commercial and government interests, which arises as a result of certain provisions of the NWPA, must be addressed in the economic assessment of technically feasible alternative paths in the management of spent HTGR fuel and waste. This new SFT program plan also incorporates a significant cooperative research and development program between the United States and the Federal Republic of Germany. The major objective of this international program is to reduce costs by avoiding duplicate efforts.

  9. Applying national survey results for strategic planning and program improvement: the National Diabetes Education Program.

    PubMed

    Griffey, Susan; Piccinino, Linda; Gallivan, Joanne; Lotenberg, Lynne Doner; Tuncer, Diane

    2015-02-01

    Since the 1970s, the federal government has spearheaded major national education programs to reduce the burden of chronic diseases in the United States. These prevention and disease management programs communicate critical information to the public, those affected by the disease, and health care providers. The National Diabetes Education Program (NDEP), the leading federal program on diabetes sponsored by the National Institutes of Health (NIH) and the Centers for Disease Control and Prevention (CDC), uses primary and secondary quantitative data and qualitative audience research to guide program planning and evaluation. Since 2006, the NDEP has filled the gaps in existing quantitative data sources by conducting its own population-based survey, the NDEP National Diabetes Survey (NNDS). The NNDS is conducted every 2–3 years and tracks changes in knowledge, attitudes and practice indicators in key target audiences. This article describes how the NDEP has used the NNDS as a key component of its evaluation framework and how it applies the survey results for strategic planning and program improvement. The NDEP's use of the NNDS illustrates how a program evaluation framework that includes periodic population-based surveys can serve as an evaluation model for similar national health education programs. PMID:25463016

  10. Solar electric propulsion system /SEPS/ program plans and system definition

    NASA Technical Reports Server (NTRS)

    Austin, R. E.; Kisko, W. A.

    1979-01-01

    The status of the NASA Solar Electric Propulsion System (SEPS) program is reviewed. The plans for SEPS definition and development include the initiation of the SEPS definition phase, the procurement for full-scale development in 1980, delivery of the SEPS for integration and tests with the comet rendezvous spacecraft in 1984, and a launch in 1985 that involves a flyby of Halley's comet in 1985 and a subsequent rendezvous with the comet Tempel 2 in 1988. In preparation for this, the acquisition process for SEPS has been initiated based on mission requirements rather than system requirements.

  11. 200 Area Liquid Effluent Facilities -- Quality assurance program plan

    SciTech Connect

    Fernandez, L.

    1995-03-13

    This Quality Assurance Program Plan (QAPP) describes the quality assurance and management controls used by the 200 Area Liquid Effluent Facilities (LEF) to perform its activities in accordance with DOE Order 5700.6C. The 200 Area LEF consists of the following facilities: Effluent Treatment Facility (ETF); Treated Effluent Disposal Facility (TEDF); Liquid Effluent Retention facility (LERF); and Truck Loading Facility -- (Project W291). The intent is to ensure that all activities such as collection of effluents, treatment, concentration of secondary wastes, verification, sampling and disposal of treated effluents and solids related with the LEF operations, conform to established requirements.

  12. Westinghouse Hanford Company quality assurance program and implementation plan

    SciTech Connect

    Moss, S.S., Westinghouse Hanford

    1996-07-01

    This is the first revision of the Quality AssurancePlan/Implementation Plan (QAP/IP) for nuclear facilities managedand operated by the Westinghouse Hanford Company (WHC).Development of the initial IP required review of the WHC qualityassurance program to the requirements of the 10 CFR 830.120, andcompletion of initial baseline assessments against the QAP toverify implementation of the program. Each WHC-managed nuclearfacility provided a stand-alone section to the QAP/IP, describingits mission and life-cycle status. WHC support organizationsalso performed assessments for their lead areas, and providedinputs to a separate stand-alone section with the initialbaseline assessment results. In this first revision, the initialbaseline matrixes for those facilities found to be in compliancewith the QAP have been removed. Tank Waste Remediation System(TWRS) and K Basins have modified their baseline matrixes to showcompletion of action items to date. With the followingexceptions, the WHC-managed nuclear facilities and their supportorganizations were found to have implemented QA programs thatsatisfy the requirements of 10 CFR 830.120. TWRS identifiedImplementation Plan Action Items having to do with: generationand revision of as-built drawings; updating TWRS organizationaland program documents; tracking the condition/age ofmaterials/equipment; and reconstitution of design bases forexisting, active facilities. No incremental funding needs wereidentified for FY95. For FY97, TWRS identified incrementalfunding in the amount of $65,000 for as-built drawings, and$100,000 for tracking the age/condition of materials/equipment.The K Basin Fuel Storage Facility identified Implementation PlanAction Items having to do with: training; updating procedures;establishing configuration management; reconstituting designbases; and providing darwings; and developing integrated,resource-loaded schedules. Incremental funding needs in theamount of $1.7 million were identified, over a time

  13. Operational readiness and operational readiness review program plan

    SciTech Connect

    Depew, E.G.

    1992-10-01

    The purpose of this program and set of procedures is to describe Mound`s plan to conduct and document Operational Readiness (OR) and Operational Readiness Reviews (ORR). The OR process provides a formal, auditable methodology for obtaining operational readiness of Category 1, Category 2, and Category 3 hazard facilities, systems, processes, or operations. This effort and subsequent review must, at a minimum, consider environmental, safety, health, technical, operational, programmatic and administrative activities. The ORR is used as a contractor line management tool for making initial start and restart decisions. It is the intent of this policy to establish the requirements for Mound OR and ORR projects.

  14. Standard Review Plan Update and Development Program. Implementing Procedures Document

    SciTech Connect

    Not Available

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  15. Integrating a Family Planning Program with a County Health Department Based Maternal and Child Health Program.

    ERIC Educational Resources Information Center

    Malinoski, Angela; Gressman, John W.

    This paper provides a description and analysis of the development, implementation, and continuing framework of practice for a model of comprehensive, coordinated maternal and child health programs in which traditional maternal and child health services are provided by a local county health department while family planning and related services are…

  16. Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999

    SciTech Connect

    Not Available

    1993-12-01

    DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

  17. [Public health program planning through the capabilities lens].

    PubMed

    Breton, E; Sherlaw, W

    2013-06-01

    As a theory of distributive justice, Amartya Sen's theory of capabilities questions the choices and decisions associated with the development and planning of public health programs. In this paper, the authors describe Sen's approach and explore its implications for public health by applying it to the case of tobacco control programs. Based on the tobacco control objectives set by the WHO and on the MPOWER package of measures, they notice that the translation of the objectives in capabilities call for a greater attention to the conditions of living of the different population groups. It also put into doubt the measures restricting access to tobacco products that do not account for their differing impacts on adults. The authors conclude that this ethical perspective is likely to be controversial as it may rank freedom as a value that overrides health. PMID:23684105

  18. Joint United States/Japanese criticality data development program plan

    SciTech Connect

    Hachiya, Y.; Koyama, T.; Smolen, G.R.; Whitesides, G.E.

    1985-01-01

    A joint program on the subject of criticality data development has been initiated by the US Department of Energy and the Japan Power Reactor and Nuclear Fuel Development Corporation. A large number of critical experiments are planned to enhance the data base of mixed plutonium and uranium solution experiments. These data will be used to validate computer codes and cross-section libraries so that nuclear fuel recycling facilities can be designed to operate more safely and economically. The program also encompasses the development of a Subcriticality Measurement System which utilizes the /sup 252/Cf source-driven neutron noise analysis method. The system will be used to measure the subcriticality states of several experimental arrangements.

  19. High-level waste management technology program plan

    SciTech Connect

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs.

  20. Next Generation Nuclear Plant Methods Technical Program Plan -- PLN-2498

    SciTech Connect

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2010-09-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  1. Next Generation Nuclear Plant Methods Technical Program Plan

    SciTech Connect

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2007-01-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  2. Next Generation Nuclear Plant Methods Technical Program Plan

    SciTech Connect

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2010-12-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  3. National Ignition Facility Quality Assurance Program Plan. Revision 1

    SciTech Connect

    Wolfe, C.R.; Yatabe, J.

    1996-09-01

    The National Ignition Facility (NIF) is a key constituent of the Department of Energy`s Stockpile Stewardship Program. The NIF will use inertial confinement fusion (ICF) to produce ignition and energy gain in ICF targets, and will perform weapons physics and high-energy- density experiments in support of national security and civilian objectives. The NIF Project is a national facility involving the collaboration of several DOE laboratories and subcontractors, including Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), and the University of Rochester Laboratory for Laser Energetics (UR/LLE). The primary mission of the NIF Project is the construction and start-up operation of laser-based facilities that will demonstrate fusion ignition in the laboratory to provide nuclear-weapons-related physics data, and secondarily, to propagate fusion burn aimed at developing a potential source of civilian energy. To support the accomplishment of this very important mission, the LLNL Laser Directorate created the NIF Project Office to organize and bring about the Project. The NIF Project Office has established this Quality Assurance Program to ensure its success. This issue of the Quality Assurance Program Plan (QAPP) adds the requirements for the conduct of Title 11 design, construction, procurement, and Title III engineering. This QAPP defines and describes the program-the management system-for specifying, achieving, and assuring the quality of all NIF Project work consistent with the policies of the Laboratory and the Laser Directorate.

  4. Planning influenza vaccination programs: a cost benefit model

    PubMed Central

    2012-01-01

    Background Although annual influenza vaccination could decrease the significant economic and humanistic burden of influenza in the United States, immunization rates are below recommended levels, and concerns remain whether immunization programs can be cost beneficial. The research objective was to compare cost benefit of various immunization strategies from employer, employee, and societal perspectives. Methods An actuarial model was developed based on the published literature to estimate the costs and benefits of influenza immunization programs. Useful features of the model included customization by population age and risk-level, potential pandemic risk, and projection year. Various immunization strategies were modelled for an average U.S. population of 15,000 persons vaccinated in pharmacies or doctor’s office during the 2011/12 season. The primary outcome measure reported net cost savings per vaccinated (PV) from the perspective of various stakeholders. Results Given a typical U.S. population, an influenza immunization program will be cost beneficial for employers when more than 37% of individuals receive vaccine in non-traditional settings such as pharmacies. The baseline scenario, where 50% of persons would be vaccinated in non-traditional settings, estimated net savings of $6 PV. Programs that limited to pharmacy setting ($31 PV) or targeted persons with high-risk comorbidities ($83 PV) or seniors ($107 PV) were found to increase cost benefit. Sensitivity analysis confirmed the scenario-based findings. Conclusions Both universal and targeted vaccination programs can be cost beneficial. Proper planning with cost models can help employers and policy makers develop strategies to improve the impact of immunization programs. PMID:22835081

  5. The Fast Flux Test Facility shutdown program plan

    SciTech Connect

    Guttenberg, S.; Jones, D.H.; Midgett, J.C.; Nielsen, D.L.

    1995-01-01

    The Fast Flux Test Facility (FFTF) is a 400 MWt sodium-cooled research reactor owned by the US Department of Energy (DOE) and operated by the Westinghouse Hanford Company (WHC) on the Hanford Site in southeastern Washington State. The decision was made by the DOE in December, 1993, to initiate shutdown of the FFTF. This paper describes the FFTF Transition Project Plan (1) (formerly the FFTF Shutdown Program Plan) which provides the strategy, major elements, and project baseline for transitioning the FFTF to an industrially and radiologically safe shutdown condition. The Plan, and its resource loaded schedule, indicate this transition can be achieved in a period of six to seven years at a cost of approximately $359 million. The transition activities include reactor defueling, fuel offload to dry cask storage, sodium drain and reaction, management of sodium residuals, shutdown of auxiliary systems, and preparation of appropriate environmental and regulatory documentation. Completion of these activities will involve resolution of many challenging and unique issues associated with shutdown of a large sodium reactor facility. At the conclusion of these activities, the FFTF will be in a safe condition for turnover to the Hanford Site Environmental Restoration Contractor for a long term surveillance and maintenance phase and decommissioning.

  6. UMTRA Project Office Quality Assurance Program Plan. Revision 5

    SciTech Connect

    Not Available

    1993-11-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office directs the overall Project. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA Project Office shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan or an industry standard format that has been approved by the DOE Project Office.

  7. "Family planning and population programs" a book review article.

    PubMed

    Hauser, P M

    1967-03-01

    RESUMEN: El volumen Planeamiento Familiar y Programas de Poblacion es un libro indispensable tanto para demógrafos como para otras personas interesadas en el control de población. Tiene sus limitaciones dodo su caracter heterogéneo, su falta de autocrítica, el no tratar sobre la validez y confiabilidad de las encuestas de conocimientos, attitudes y prácticas (KAP), su injustificado tono optimista, y su fracaso al no explorar y considerar alternativas para las presunciones y premisas sobre las cuales se basan los actuates programas de planeamiento familiar. Es sin embargo un importante hito que resume las contribuciones de las ciencias sociales y biomédicas al campo de la demografía.SummaryThe volume Family Planning and Population Programs is an indispensable book to demographers as well as to others concerned with population control. It is not without limitations because of its heterogeneous character, its lack of self-criticism, its failure to deal with the reliability and validity of KAP surveys, its unwarranted optimistic aura, and its failure to explore and consider alternatives to the basic assumptions and premises on which present family planning programs are based. It is, nevertheless, a landmark in its summarization of the contribution of the social and biomedical sciences to demographic engineering. PMID:21279790

  8. The Des Moines Plan for Student Success. Focus on Program Evaluation.

    ERIC Educational Resources Information Center

    Des Moines Public Schools, IA.

    The Des Moines (Iowa) Plan for Student Success provides an academic program for about 6,500 students having difficulty in reading/writing and/or mathematics in K-12. The Plan is a comprehensive kindergarten through grade 12 program with five components: (1) a Kindergarten Enrichment Program; (2) the Reading Recovery Program; (3) the…

  9. Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases

    SciTech Connect

    Carlsbad Field Office

    2007-11-19

    The Performance Demonstration Program (PDP) for headspace gases distributes blind audit samples in a gas matrix for analysis of volatile organic compounds (VOCs). Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document

  10. Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases

    SciTech Connect

    Carlsbad Field Office

    2007-11-13

    The Performance Demonstration Program (PDP) for headspace gases distributes blind audit samples in a gas matrix for analysis of volatile organic compounds (VOCs). Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document

  11. Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases

    SciTech Connect

    Carlsbad Field Office

    2006-04-01

    The Performance Demonstration Program (PDP) for headspace gases distributes sample gases of volatile organic compounds (VOCs) for analysis. Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document. Participating measurement

  12. Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability

    PubMed Central

    Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.

    2014-01-01

    Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program’s sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning. PMID:24456644

  13. National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006

    SciTech Connect

    Ternes, Mark P; Schweitzer, Martin; Tonn, Bruce Edward; Schmoyer, Richard L; Eisenberg, Joel Fred

    2007-02-01

    The U.S. Department of Energy's (DOE's) Weatherization Assistance Program was created by Congress in 1976 under Title IV of the Energy Conservation and Production Act. The purpose and scope of the Program as currently stated in the Code of Federal Regulations (CFR) 10CFR 440.1 is 'to increase the energy efficiency of dwellings owned or occupied by low-income persons, reduce their total residential expenditures, and improve their health and safety, especially low-income persons who are particularly vulnerable such as the elderly, persons with disabilities, families with children, high residential energy users, and households with high energy burden' (Code of Federal Regulations, 2005). DOE sponsored a comprehensive evaluation of the Program in the early 1990's to provide policy makers and program implementers with up-to-date and reliable information they needed for effective decision making and cost-effective operations. Oak Ridge National Laboratory (ORNL) managed the five part study which was based primarily on data from Program Year (PY) 1989 and supplemented by data from 1991-92 (Brown, Berry, and Kinney, 1994). In more recent years, ORNL has conducted four metaevaluations of the Program's energy savings using studies conducted by individual states between the years 1990-1996 (Berry, 1997), 1996-1998 (Schweitzer and Berry, 1999), 1993-2002 (Berry and Schweitzer, 2003), and 1993-2005 (Schweitzer, 2005). DOE announced through its Weatherization Program Notice 05-1 (DOE, 2004) that it would undertake a new national evaluation of the Program because the Program that was evaluated comprehensively in the early 1990's is vastly different from the Program of today. The Program has incorporated new funding sources, management principles, audit procedures, and energy-efficiency measures in response to findings and recommendations resulting from the 1989 National Evaluation, the Weatherization Plus strategic planning process, and other federal, state, and local initiatives

  14. NASA earth science and applications division: The program and plans for FY 1988-1989-1990

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Described here are the Division's research goals, priorities and emphases for the next several years and an outline of longer term plans. Included are highlights of recent accomplishments, current activities in FY 1988, research emphases in FY 1989, and longer term future plans. Data and information systems, the Geodynamics Program, the Land Processes Program, the Oceanic Processes Program, the Atmospheric Dynamics and Radiation Program, the Atmospheric Chemistry Program, and space flight programs are among the topic covered.

  15. The Australian Geodetic Observing Program. Current Status and Future Plans

    NASA Astrophysics Data System (ADS)

    Johnston, G.; Dawson, J. H.

    2015-12-01

    Over the last decade, the Australian government has through programs like AuScope, the Asia Pacific Reference Frame (APREF), and the Pacific Sea Level Monitoring (PSLM) Project made a significant contribution to the Global Geodetic Observing Program. In addition to supporting the national research priorities, this contribution is justified by Australia's growing economic dependence on precise positioning to underpin efficient transportation, geospatial data management, and industrial automation (e.g., robotic mining and precision agriculture) and the consequent need for the government to guarantee provision of precise positioning products to the Australian community. It is also well recognised within Australia that there is an opportunity to exploit our near unique position as being one of the few regions in the world to see all new and emerging satellite navigation systems including Galileo (Europe), GPS III (USA), GLONASS (Russia), Beidou (China), QZSS (Japan) and IRNSS (India). It is in this context that the Australian geodetic program will build on earlier efforts and further develop its key geodetic capabilities. This will include the creation of an independent GNSS analysis capability that will enable Australia to contribute to the International GNSS Service (IGS) and an upgrade of key geodetic infrastructure including the national VLBI and GNSS arrays. This presentation will overview the significant geodetic activities undertaken by the Australian government and highlight its future plans.

  16. UMTRA technical assistance contractor Quality Assurance Program Plan. Revision 4

    SciTech Connect

    Pehrson, P.

    1993-10-12

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation.

  17. Proceedings of the flexible, midsize gas turbine program planning workshop

    SciTech Connect

    1997-03-01

    The US Department of Energy (DOE) and the California Energy Commission (CEC) held a program planning workshop on March 4--5, 1997 in Sacramento, California on the subject of a flexible, midsize gas turbine (FMGT). The workshop was also co-sponsored by the Electric Power Research Institute (EPRI), the Gas Research Institute (GRI), the Gas Turbine Association (GTA), and the Collaborative Advanced Gas Turbine Program (CAGT). The purpose of the workshop was to bring together a broad cross section of knowledgeable people to discuss the potential benefits, markets, technical attributes, development costs, and development funding approaches associated with making this new technology available in the commercial marketplace. The participants in the workshop included representatives from the sponsoring organizations, electric utilities, gas utilities, independent power producers, gas turbine manufacturers, gas turbine packagers, and consultants knowledgeable in the power generation field. Thirteen presentations were given on the technical and commercial aspects of the subject, followed by informal breakout sessions that dealt with sets of questions on markets, technology requirements, funding sources and cost sharing, and links to other programs.

  18. Program plan for the resolution of tank vapor issues

    SciTech Connect

    Osborne, J.W.; Huckaby, J.L.

    1994-05-01

    Since 1987, workers at the Hanford Site waste tank farms in Richland, Washington, have reported strong odors emanating from the large, underground high-level radioactive waste storage tanks. Some of these workers have complained of symptoms (e.g., headaches, nausea) related to the odors. In 1992, the U.S. Department of Energy, which manages the Hanford Site, and Westinghouse Hanford Company determined that the vapor emissions coming from the tanks had not been adequately characterized and represented a potential health risk to workers in the immediate vicinity of the tanks. At that time, workers in certain areas of the tank farms were required to use full-face, supplied-breathing-air masks to reduce their exposure to the fugitive emissions. While use of supplied breathing air reduced the health risks associated with the fugitive emissions, it introduced other health and safety risks (e.g., reduced field of vision, air-line tripping hazards, and heat stress). In 1992, an aggressive program was established to assure proper worker protection while reducing the use of supplied breathing air. This program focuses on characterization of vapors inside the tanks and industrial hygiene monitoring in the tank farms. If chemical filtration systems for mitigation of fugitive emissions are deemed necessary, the program will also oversee their design and installation. This document presents the plans for and approach to resolving the Hanford Site high-level waste tank vapor concerns. It is sponsored by the Department of Energy Office of Environmental Restoration and Waste Management.

  19. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  20. Fossil Energy Materials Program implementation plan for fiscal years 1985 through 1989

    SciTech Connect

    Bradley, R.A.; Carlson, P.T.

    1985-02-01

    This program implementation plan for the Department of Energy Advanced Research and Technology Development (AR and TD) Fossil Energy Materials Program reviews the background, technical issues, and research and development needs for materials of construction for fossil energy systems. The status and plans for research and development activities in the AR and TD Fossil Energy Materials Program are then discussed for various materials disciplines. Detailed information about these plans is provided for FY 1985 through FY 1987, and long-range plans are described for FY 1988 and FY 1989. In addition to descriptions of planned research activities, this plan provides levels of effort required for the various activities.