Science.gov

Sample records for project analisi ambientale

  1. Analisys, processing and validation data from eolic stations of SONDA project (National Organization System of Environmental Data) at Brazilian National Institute for Space Research (CPTEC/INPE) .

    NASA Astrophysics Data System (ADS)

    Junior, A. B.; Nogueira, J. M.; Garcia, S. G.; Andrade, E. S.

    2007-05-01

    Asiel Bomfin Jr. LIM/CPTEC/INPE, Cachoeira Paulista, S.P., Brazil; Eliana Soares de Andrade; Jorge Luiz Martins Nogueira and Silvia Garcia de Castro. The Center for Weather Forecast and Climatic Analysis (CPTEC), a division of INPE, the Brazilian National Institute for Space Research. Several of the INPE´s departments and centers, like the CPTEC, have a variety of valuable datasets, many of them freely available and eolic data from SONDA project are also part of them at Meteorological Instrumental Laboratory (LIM). This paper presents the Analiys, processing and validation method applied to the eolic data in a temporal time of ten minutes, to be used in a PC IBM computer. This method is divided in tree separated programs. The first software called "separa.c" has the capability of divide the ingest data set in mensal files, identified by each station group. The second software called "minuto.c" does a syntactical analysis, verifying and correcting eventual lost data with NAN values. The third one called "validacode.c" generates two principal files, one containing the original data and the other with the codes of each variable for each minute analyzed. These codes is based on BSRN (Baseline Surface Radiation Network), but with some differences in their analyzed method. This method followed the Webmet.com, The Meteorological Resource Center. Table 1:Validation Codes Code Meaning 0 Quality check procedure is not avaiable for this level 2 The data is suspect 5 Quality check procedure is avaiable for this level, but not can be done 9 The data is correct Table 2: Validation levels for WIND SPEED: Validation Levels Quality check procedure for suspect data 0 Maximum and Minimum values of 25 m/s and 0 m/s 1 Can not vary more than 0,1 m/s for 03 consecutive hours 2 Can not vary more than 0,5 m/s for 12 consecutive hours 3 - Table 3: Validation levels for WIND DRECTION: Validation Levels Quality check procedure for suspect data 0 Maximum and Minimum values of 360 and 0

  2. Veicolarita e linguaggio scientifico--analisi del primo "Progetto italiano per studenti universitari somali" (Languages for Special Purposes and Scientific Usage--An Analysis of the First "Italian Project for Somali University Students").

    ERIC Educational Resources Information Center

    Amato, Antonio

    1979-01-01

    The development of an intensive Italian course for science students attending Somalia's National University is described. The historical background for this project, sponsored by the Italian Government and staffed by Italian teachers, is outlined. Course objectives, methods, and organization are illustrated by samples of instructional materials,…

  3. Determinacion de periodos fundamentales del suelo mediante vibraciones ambientales en el municipio de Humacao, Puerto Rico

    NASA Astrophysics Data System (ADS)

    Cintron Aponte, Rommel

    La tecnica de Nakamura ha sido utilizada a nivel mundial para determinar periodos fundamentales del suelo. La tecnica consiste en calcular y graficar cocientes espectrales H/V de vibraciones ambientales registradas sobre el suelo. Mediciones de vibraciones ambientales fueron tomadas en 151 lugares dentro del municipio de Humacao, localizado al este de Puerto Rico. Los datos se procesaron utilizando espectros de Fourier y espectros de potencia. La tecnica fue validada al compararla con los resultados de cocientes espectrales H/V de registros de sismos debiles y tambien con una modelacion numerica realizada con datos de un ensayo "downhole". Las graficas de los cocientes espectrales H/V fueron divididas en casos y grupos, los cuales dependen de la facilidad para identificar el periodo fundamental pico y amplitudes en frecuencias menores de 1 Hz, respectivamente. Los resultados obtenidos con ambos espectros fueron comparados y se concluye que los mismos se complementan para proveer resultados mas confiables. Se crearon mapas de periodos fundamentales, factores de amplitud, isoperiodos y clasificacion sismica de sitio. Los mapas de isoperiodos fueron realizados en las zonas mas pobladas sobre depositos de suelo. El mapa de periodos fundamentales del suelo mostro buena correlacion con la geologia local. El mapa de clasificacion sismica derivado de periodos de sitio fue comparado con el mapa de clasificacion sismica derivado de barrenos geotecnicos. El mapa de clasificacion obtenido de periodos puede sobreestimar un poco algunas clasificaciones del suelo. Sin embargo, este mapa puede proveer un estimado aproximado de la velocidad de onda de corte promedio del suelo hasta una profundidad de 100 pies (30 metros).

  4. Project: "Project!"

    ERIC Educational Resources Information Center

    Grayson, Katherine

    2007-01-01

    In November 2006, the editors of "Campus Technology" launched their first-ever High-Resolution Projection Study, to find out if the latest in projector technology could really make a significant difference in teaching, learning, and educational innovation on US campuses. The author and her colleagues asked campus educators, technologists, and…

  5. PROGRAMA PARA LA VERIFICACION DE LA TECNOLOGIA AMBIENTAL - CULTIVANDO ASOCIACIONES PARA EL INCREMENTO DE LAS SELECCIONES DE TECNOLOGIAS AMBIENTALES A LOS SECTORES PUBLICO Y PRIVADO EN LOS ESTADOS UNIDOS Y EN EL EXTERIOR (EPA/600/F-97/005A)

    EPA Science Inventory

    La meta del ETV es verificar, a travs de una
    evaluacin de informacin objectiva y de calidad, las caracteristicas del desempeo de tecnologas
    comerciales ambientales. As el ETV proporciona a
    los compradores y los licenciadores potenciales una valoracin imparcial y creble d...

  6. Project Wild (Project Tame).

    ERIC Educational Resources Information Center

    Siegenthaler, David

    For 37 states in the United States, Project Wild has become an officially sanctioned, distributed and funded "environemtnal and conservation education program." For those who are striving to implement focused, sequential, learning programs, as well as those who wish to promote harmony through a non-anthropocentric world view, Project Wild may…

  7. Reducing time delay in the thrombolysis of myocardial infarction: an internal quality improvement project. ARIAM Project Group. Analisis del Retraso en Infarto Agudo de Miocardio.

    PubMed

    Saturno, P J; Felices, F; Segura, J; Vera, A; Rodriguez, J J

    2000-01-01

    The objectives of this study were to improve thrombolytic therapy in acute myocardial infarction by reducing the "door-to-needle" time in a 285-bed university hospital in Spain. A quality management approach was used involving all the relevant staff. Target standard was set at 35 minutes. Baseline data, intervention effect, and continuous monitoring were analyzed using x control charts. Analysis of baseline data showed a wide out-of-control variation and 72 minutes' average delay. Cause analysis revealed organizational and clinical problems that were subjected to intervention. Postintervention data showed a stable process, with an average of 30 minutes. Continuous monitoring showed further improvement in average time and predictable variation. The template of the current control chart has an average of 26 minutes. Quality management methods, particularly staff involvement in problem analysis and intervention design, and the use of control charts were useful to understand, solve, and continuously monitor an important clinical problem whose existence was evident only after it was measured. PMID:10872258

  8. Projects Work!

    ERIC Educational Resources Information Center

    Textor, Martin R.

    2005-01-01

    The great educational value of projects is emphasized by contrasting negative aspects of the life of today's children with the goals of project work. This is illustrated by a project "Shopping." It is shown what children are learning in such projects and what the advantages of project work are. Relevant topic areas, criteria for selecting a…

  9. Shop Projects.

    ERIC Educational Resources Information Center

    Patton, Bob

    Vocational agriculture teachers in Oklahoma prepared the shop project drawings which comprise the document. Seventy-one projects, with lists of required materials, diagrams, and measurements, are included. Construction projects fall into six categories (number of projects in parentheses): Trailers (5), racks (3), livestock production projects…

  10. Analisis del contenido curricular de los Documentos Normativos del Programa de Ciencias en el area de biologia para la escuela superior del sistema de educacion publica de Puerto Rico: 1993-2012

    NASA Astrophysics Data System (ADS)

    Davila Montanez, Melissa

    Esta investigacion de naturaleza cualitativa se ocupo de realizar un analisis de contenido documental de los Documentos Normativos del Programa de Ciencias en el area de biologia de la escuela superior del sistema de educacion publica de Puerto Rico del periodo 1993-2012. Los documentos analizados fueron: Guia Curricular, 1995; Marco Curricular, 2003; Estandares de Excelencia, 1996, 2000 y Estandares de Contenido y Expectativas de Grado, 2007. Se indago si hubo cambios en significados en los Componentes Estructurales: Naturaleza de la ciencia, Paradigmas para la ensenanza de la ciencia, Funcion del curriculo formal, Mision de la ensenanza de la ciencia; Contenidos, destrezas y competencias, Estrategias de ensenanza y Evaluacion/Assessment del aprendizaje. El analisis sugiere que no hubo cambios sustanciales en los significados de los Componentes Estructurales. Los documentos estudiados muestran mayormente caracteristicas similares, aunque los documentos mas recientes eran mas descriptivos, explicativos y especificos.

  11. [Analisys of work-related accidents and incidents in an oil refinery in Rio de Janeiro].

    PubMed

    de Souza, Carlos Augusto Vaz; de Freitas, Carlos Machado

    2003-01-01

    Accidents in the chemical industry can have serious consequences for workers, communities, and the environment and are thus highly relevant to public health. This article is the result of an occupational surveillance project involving several public institutions. We analyze 800 work-related accidents that resulted in injuries, environmental damage, or loss of production in 1997 in an oil refinery located in Rio de Janeiro, Brazil. The methodology was based on managerial and organizational approaches to accident investigation, with the European Union reporting system as the reference. The results highlight various limitations in the process of reporting and investigating accidents, as well as a certain hierarchy of accidents, with more attention given to accidents involving loss of production and less to those resulting in injuries, particularly among outsourced workers. PMID:14666211

  12. Coastal morphodynamic features/patterns analisys through a video-based system and image processing

    NASA Astrophysics Data System (ADS)

    Santos, Fábio; Pais-Barbosa, Joaquim; Teodoro, Ana C.; Gonçalves, Hernâni; Baptista, Paolo; Moreira, António; Veloso-Gomes, Fernando; Taveira-Pinto, Francisco; Gomes-Costa, Paulo; Lopes, Vítor; Neves-Santos, Filipe

    2012-10-01

    The Portuguese coastline, like many other worldwide coastlines, is often submitted to several types of extreme events resulting in erosion, thus, acquisition of high quality field measurements has become a common concern. The nearshore survey systems have been traditionally based on in situ measurements or in the use of satellite or aircraft mounted remote sensing systems. As an alternative, video-monitoring systems proved to be an economic and efficient way to collect useful and continuous data, and to document extreme events. In this context, is under development the project MoZCo (Advanced Methodologies and Techniques Development for Coastal Zone Monitoring), which intends to develop and implement monitoring techniques for the coastal zone based on a low cost video monitoring system. The pilot study area is Ofir beach (north of Portugal), a critical coastal area. In the beginning of this project (2010) a monitoring video station was developed, collecting snapshots and 10 minutes videos every hour. In order to process the data, several video image processing algorithms were implemented in Matlab®, allowing achieve the main video-monitoring system products, such as, the shoreline detection. An algorithm based on image processing techniques was developed, using the HSV color space, the idea is to select a study and a sample area, containing pixels associated with dry and wet regions, over which a thresholding and some morphological operators are applied. After comparing the results with manual digitalization, promising results were achieved despite the method's simplicity, which is in continuous development in order to optimize the results.

  13. Project Success.

    ERIC Educational Resources Information Center

    Meredith, Larry D.

    Project Success consists of after-school, weekend, and summer educational programs geared toward minority and disadvantaged students to increase their numbers seeking postsecondary education from the Meadville, Pennsylvania area. The project is funded primarily through the Edinboro University of Pennsylvania, whose administration is committed to…

  14. Project SEED.

    ERIC Educational Resources Information Center

    Chemical and Engineering News, 1986

    1986-01-01

    Reports on Project SEED (Summer Educational Experience for the Disadvantaged) a project in which high school students from low-income families work in summer jobs in a variety of academic, industrial, and government research labs. The program introduces the students to career possibilities in chemistry and to the advantages of higher education.…

  15. Project EASIER.

    ERIC Educational Resources Information Center

    Alvord, David J.; Tack, Leland R.; Dallam, Jerald W.

    1998-01-01

    Describes the development of Project EASIER, a collaborative electronic-data interchange for networking Iowa local school districts, education agencies, community colleges, universities, and the Department of Education. The primary goal of this project is to develop and implement a system for collection of student information for state and federal…

  16. Project FAST.

    ERIC Educational Resources Information Center

    Essexville-Hampton Public Schools, MI.

    Described are components of Project FAST (Functional Analysis Systems Training) a nationally validated project to provide more effective educational and support services to learning disordered children and their regular elementary classroom teachers. The program is seen to be based on a series of modules of delivery systems ranging from mainstream…

  17. Geodynamics Project

    ERIC Educational Resources Information Center

    Drake, Charles L.

    1977-01-01

    Describes activities of Geodynamics Project of the Federal Council on Science and Technology, such as the application of multichannel seismic-reflection techniques to study the nature of the deep crust and upper mantle. (MLH)

  18. Project Soar.

    ERIC Educational Resources Information Center

    Austin, Marion

    1982-01-01

    Project Soar, a Saturday enrichment program for gifted students (6-14 years old), allows students to work intensively in a single area of interest. Examples are cited of students' work in crewel embroidery, creative writing, and biochemistry. (CL)

  19. Project Reptile!

    ERIC Educational Resources Information Center

    Diffily, Deborah

    2001-01-01

    Integrating curriculum is important in helping children make connections within and among areas. Presents a class project for kindergarten children which came out of the students' interests and desire to build a reptile exhibit. (ASK)

  20. Projection displays

    NASA Astrophysics Data System (ADS)

    Chiu, George L.; Yang, Kei H.

    1998-08-01

    Projection display in today's market is dominated by cathode ray tubes (CRTs). Further progress in this mature CRT projector technology will be slow and evolutionary. Liquid crystal based projection displays have gained rapid acceptance in the business market. New technologies are being developed on several fronts: (1) active matrix built from polysilicon or single crystal silicon; (2) electro- optic materials using ferroelectric liquid crystal, polymer dispersed liquid crystals or other liquid crystal modes, (3) micromechanical-based transducers such as digital micromirror devices, and grating light valves, (4) high resolution displays to SXGA and beyond, and (5) high brightness. This article reviews the projection displays from a transducer technology perspective along with a discussion of markets and trends.

  1. Cloudnet Project

    DOE Data Explorer

    Hogan, Robin

    2008-01-15

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  2. LLAMA Project

    NASA Astrophysics Data System (ADS)

    Arnal, E. M.; Abraham, Z.; Giménez de Castro, G.; de Gouveia dal Pino, E. M.; Larrarte, J. J.; Lepine, J.; Morras, R.; Viramonte, J.

    2014-10-01

    The project LLAMA, acronym of Long Latin American Millimetre Array is very briefly described in this paper. This project is a joint scientific and technological undertaking of Argentina and Brazil on the basis of an equal investment share, whose mail goal is both to install and to operate an observing facility capable of exploring the Universe at millimetre and sub/millimetre wavelengths. This facility will be erected in the argentinean province of Salta, in a site located at 4830m above sea level.

  3. Maximum Capital Project Management.

    ERIC Educational Resources Information Center

    Adams, Matt

    2002-01-01

    Describes the stages of capital project planning and development: (1) individual capital project submission; (2) capital project proposal assessment; (3) executive committee; and (4) capital project execution. (EV)

  4. Project CLASS.

    ERIC Educational Resources Information Center

    McBain, Susan L.; And Others

    Project CLASS (Competency-Based Live-Ability Skills) uses a series of 60 modules to teach life survival skills to adults with low-level reading ability--especially Adult Basic Education/English as a Second Language students. Two versions of the modules have been developed: one for use with teacher-directed instruction and another for independent…

  5. Limnological Projects.

    ERIC Educational Resources Information Center

    Hambler, David J.; Dixon, Jean M.

    1982-01-01

    Describes collection of quantitative samples of microorganisms and accumulation of physical data from a pond over a year. Provides examples of how final-year degree students have used materials and data for ecological projects (involving mainly algae), including their results/conclusions. Also describes apparatus and reagents used in the student…

  6. Project Schoolflight

    ERIC Educational Resources Information Center

    Owen, Ben

    1975-01-01

    Describes "Project School Flight" which is an idea originated by the Experimental Aircraft Association to provide the opportunity for young people to construct a light aircraft in the schools as part of a normal class. Address included of Experimental Aircraft Association for interested persons. (BR)

  7. Project Boomerang

    ERIC Educational Resources Information Center

    King, Allen L.

    1975-01-01

    Describes an experimental project on boomerangs designed for an undergraduate course in classical mechanics. The students designed and made their own boomerangs, devised their own procedures, and carried out suitable measurements. Presents some of their data and a simple analysis for the two-bladed boomerang. (Author/MLH)

  8. Project COLD.

    ERIC Educational Resources Information Center

    Kazanjian, Wendy C.

    1982-01-01

    Describes Project COLD (Climate, Ocean, Land, Discovery) a scientific study of the Polar Regions, a collection of 35 modules used within the framework of existing subjects: oceanography, biology, geology, meterology, geography, social science. Includes a partial list of topics and one activity (geodesic dome) from a module. (Author/SK)

  9. Project Documerica

    ERIC Educational Resources Information Center

    Journal of College Science Teaching, 1972

    1972-01-01

    The Environmental Protection Agency has started a project to actually picture the environmental movement in the United States. This is an attempt to make the public aware of the air pollution in their area or state and to acquaint them with the effects of air cleaning efforts. (PS)

  10. Tedese Project

    NASA Astrophysics Data System (ADS)

    Buforn, E.; Davila, J. Martin; Bock, G.; Pazos, A.; Udias, A.; Hanka, W.

    The TEDESE (Terremotos y Deformacion Cortical en el Sur de España) project is a joint project of the Universidad Complutense de Madrid (UCM) and Real Instituto y Observatorio de la Armada de San Fernando, Cadiz (ROA) supported by the Spanish Ministerio de Ciencia y Tecnologia with the participation of the GeoforschungZen- trum, Potsdam (GFZ). The aim is to carry out a study of the characteristics of the oc- currence and mechanism of earthquakes together with measurements of crustal struc- ture and deformations in order to obtain an integrated evaluation of seismic risk in southern Spain from. As part of this project a temporal network of 10 broad-band seismological stations, which will complete those already existing in the zone, have been installed in southern Spain and northern Africa for one year beginning in October 2001. The objectives of the project are the study in detail of the focal mechanisms of earthquakes in this area, of structural in crust and upper mantle, of seismic anisotropy in crust and mantle as indicator for tectonic deformation processed and the measure- ments of crustal deformations using techniques with permanent GPS and SLR stations and temporary GPS surveys. From these studies, seismotectonic models and maps will be elaborated and seismic risk in the zone will be evaluated.

  11. Project Reconstruct.

    ERIC Educational Resources Information Center

    Helisek, Harriet; Pratt, Donald

    1994-01-01

    Presents a project in which students monitor their use of trash, input and analyze information via a database and computerized graphs, and "reconstruct" extinct or endangered animals from recyclable materials. The activity was done with second-grade students over a period of three to four weeks. (PR)

  12. Projected Identities

    ERIC Educational Resources Information Center

    Anderson, Mark Alan

    2006-01-01

    This article presents the idea behind Projected Identities, an art activity wherein students fuse art-making processes and digital image manipulations in a series of exploratory artistic self-examinations. At some point in every person's life they've been told something hard to forget. Students might, for example, translate phrases like, "Good…

  13. Thanksgiving Project

    ERIC Educational Resources Information Center

    Hilden, Pauline

    1976-01-01

    A teacher describes a Thanksgiving project in which 40 educable mentally retarded students (6-13 years old) made and served their own dinner of stew, butter, bread, ice cream, and pie, and in the process learned about social studies, cooking, and proper meal behavior. (CL)

  14. PROJECT RESPECT

    EPA Science Inventory

    Project RESPECT was a national study evaluating the efficacy of HIV prevention counseling in changing high risk sexual behaviors and preventing new sexually transmitted diseases (STDs) and HIV. The trial enrolled men and women who came for diagnosis and treatment of an STD to one...

  15. Project Katrina

    ERIC Educational Resources Information Center

    Aghayan, Carol; Schellhaas, Andree; Wayne, Angela; Burts, Diane C.; Buchanan, Teresa K.; Benedict, Joan

    2005-01-01

    This article describes a spontaneous project that emerged from a group of 3- and 4-year-old children in Louisiana after Hurricane Katrina. The article describes how the teachers adapted the classroom and curriculum to meet the diverse needs of children who were evacuees, as well as those children who were affected in other ways by the…

  16. Project Notes

    ERIC Educational Resources Information Center

    School Science Review, 1977

    1977-01-01

    Listed and described are student A-level biology projects in the following areas: Angiosperm studies (e.g., factors affecting growth of various plants), 7; Bacterial studies, 1; Insect studies, 2; Fish studies, 1; Mammal studies, 1; Human studies, 1; Synecology studies, 2; Environmental studies, 2; and Enzyme studies, 1. (CS)

  17. Project Narrative

    SciTech Connect

    Driscoll, Mary C.

    2012-07-12

    The Project Narrative describes how the funds from the DOE grant were used to purchase equipment for the biology, chemistry, physics and mathematics departments. The Narrative also describes how the equipment is being used. There is also a list of the positive outcomes as a result of having the equipment that was purchased with the DOE grant.

  18. Project Notes.

    ERIC Educational Resources Information Center

    School Science Review, 1979

    1979-01-01

    Listed are 32 biology A-level projects, categorized by organisms studied as follows: algae (1), bryophytes (1), angiosperms (14), fungi (1), flatworms (1), annelids (2), molluscs (1), crustaceans (2), insects (4), fish (2), mammals (1), humans (1); and one synecological study. (CS)

  19. Project Paiute

    ERIC Educational Resources Information Center

    Dearmin, Evalyn Titus

    1977-01-01

    Working with the Humboldt County School District, the Fort McDermitt Indian Education Committee, and four Paiute Teacher aides, the University of Nevada developed a three-component project: a bilingual/bicultural reading text for K-4 Paiutes; an in-service training program in Native American education; and a pilot bilingual curriculum. (JC)

  20. Project Succeed.

    ERIC Educational Resources Information Center

    Patterson, John

    Project Succeed is a program for helping failure- and dropout-oriented pupils to improve their school achievement. Attendance and assignment completion are the key behaviors for enhancing achievement. Behavior modification and communications procedures are used to bring about the desired changes. Treatment procedures include current assessment…

  1. Project SUCCEED.

    ERIC Educational Resources Information Center

    Yarger, Sam; Klingner, Janette

    This paper describes Project SUCCEED (School University Community Coalition for Excellence in Education). The coalition includes the University of Miami School of Education, the University of Miami College of Arts and Sciences, Miami-Dade County Public Schools, and the Miami Museum of Science. The goal is to provide a comprehensive approach to…

  2. Project CAST.

    ERIC Educational Resources Information Center

    Charles County Board of Education, La Plata, MD. Office of Special Education.

    The document outlines procedures for implementing Project CAST (Community and School Together), a community-based career education program for secondary special education students in Charles County, Maryland. Initial sections discuss the role of a learning coordinator, (including relevant travel reimbursement and mileage forms) and an overview of…

  3. Spent Nuclear Fuel project, project management plan

    SciTech Connect

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  4. Cognitive Education Project. Summary Project.

    ERIC Educational Resources Information Center

    Mulcahy, Robert; And Others

    The Cognitive Education Project conducted a 3-year longitudinal evaluation of two cognitive education programs that were aimed at teaching thinking skills. The critical difference between the two experimental programs was that one, Feuerstein's Instrumental Enrichment (IE) method, was taught out of curricular content, while the other, the…

  5. Project Prometheus

    NASA Technical Reports Server (NTRS)

    Johnson, Steve

    2003-01-01

    Project Prometheus will enable a new paradigm in the scientific exploration of the Solar System. The proposed JIMO mission will start a new generation of missions characterized by more maneuverability, flexibility, power and lifetime. Project Prometheus organization is established at NASA Headquarters: 1.Organization established to carry out development of JIMO, nuclear power (radioisotope), and nuclear propulsion research. 2.Completed broad technology and national capacity assessments to inform decision making on planning and technology development. 3.Awarded five NRA s for nuclear propulsion research. 4.Radioisotope power systems in development, and Plutonium-238 being purchased from Russia. 5.Formulated science driven near-term and long-term plan for the safe utilization of nuclear propulsion based missions. 6.Completed preliminary studies (Pre-Phase A) of JIMO and other missions. 7.Initiated JIMO Phase A studies by Contractors and NASA.

  6. SIMBIOS Project

    NASA Technical Reports Server (NTRS)

    Fargion, Giulietta S.; McClain, Charles R.; Busalacchi, Antonio J. (Technical Monitor)

    2001-01-01

    The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRAI) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  7. Project summaries

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Lunar base projects, including a reconfigurable lunar cargo launcher, a thermal and micrometeorite protection system, a versatile lifting machine with robotic capabilities, a cargo transport system, the design of a road construction system for a lunar base, and the design of a device for removing lunar dust from material surfaces, are discussed. The emphasis on the Gulf of Mexico project was on the development of a computer simulation model for predicting vessel station keeping requirements. An existing code, used in predicting station keeping requirements for oil drilling platforms operating in North Shore (Alaska) waters was used as a basis for the computer simulation. Modifications were made to the existing code. The input into the model consists of satellite altimeter readings and water velocity readings from buoys stationed in the Gulf of Mexico. The satellite data consists of altimeter readings (wave height) taken during the spring of 1989. The simulation model predicts water velocity and direction, and wind velocity.

  8. Hydropower Projects

    SciTech Connect

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

  9. Project MEDSAT

    NASA Astrophysics Data System (ADS)

    During the winter term of 1991, two design courses at the University of Michigan worked on a joint project, MEDSAT. The two design teams consisted of the Atmospheric, Oceanic, and Spacite System Design and Aerospace Engineering 483 (Aero 483) Aerospace System Design. In collaboration, they worked to produce MEDSAT, a satellite and scientific payload whose purpose was to monitor environmental conditions over Chiapas, Mexico. Information gained from the sensing, combined with regional data, would be used to determine the potential for malaria occurrence in that area. The responsibilities of AOSS 605 consisted of determining the remote sensing techniques, the data processing, and the method to translate the information into a usable output. Aero 483 developed the satellite configuration and the subsystems required for the satellite to accomplish its task. The MEDSAT project is an outgrowth of work already being accomplished by NASA's Biospheric and Disease Monitoring Program and Ames Research Center. NASA's work has been to develop remote sensing techniques to determine the abundance of disease carriers and now this project will place the techniques aboard a satellite. MEDSAT will be unique in its use of both a Synthetic Aperture Radar and visual/IR sensor to obtain comprehensive monitoring of the site. In order to create a highly feasible system, low cost was a high priority. To obtain this goal, a light satellite configuration launched by the Pegasus launch vehicle was used.

  10. Project MEDSAT

    NASA Technical Reports Server (NTRS)

    1991-01-01

    During the winter term of 1991, two design courses at the University of Michigan worked on a joint project, MEDSAT. The two design teams consisted of the Atmospheric, Oceanic, and Spacite System Design and Aerospace Engineering 483 (Aero 483) Aerospace System Design. In collaboration, they worked to produce MEDSAT, a satellite and scientific payload whose purpose was to monitor environmental conditions over Chiapas, Mexico. Information gained from the sensing, combined with regional data, would be used to determine the potential for malaria occurrence in that area. The responsibilities of AOSS 605 consisted of determining the remote sensing techniques, the data processing, and the method to translate the information into a usable output. Aero 483 developed the satellite configuration and the subsystems required for the satellite to accomplish its task. The MEDSAT project is an outgrowth of work already being accomplished by NASA's Biospheric and Disease Monitoring Program and Ames Research Center. NASA's work has been to develop remote sensing techniques to determine the abundance of disease carriers and now this project will place the techniques aboard a satellite. MEDSAT will be unique in its use of both a Synthetic Aperture Radar and visual/IR sensor to obtain comprehensive monitoring of the site. In order to create a highly feasible system, low cost was a high priority. To obtain this goal, a light satellite configuration launched by the Pegasus launch vehicle was used.

  11. Burnet Project

    PubMed Central

    Masellis, A.; Atiyeh, B.

    2009-01-01

    Summary The BurNet project, a pilot project of the Eumedis initiative, has become true. The Eumedis (EUro MEDiterranean Information Society) initiative is part of the MEDA programme of the EU to develop the Information Society in the Mediterranean area. In the health care sector, the objective of Eumedis is: the deployment of network-based solutions to interconnect - using userfriendly and affordable solutions - the actors at all levels of the "health care system" of the Euro-Mediterranean region. The Bur Net project interconnects 17 Burn Centres (BC) in the Mediterranean Area through an information network both to standardize courses of action in the field of prevention, treatment, and functional and psychological rehabilitation of burn patients and to coordinate interactions between BC and emergency rooms in peripheral hospitals using training/information activities and telemedicine to optimize first aid provided to burn patients before referral to a BC. Shared procedure protocols for prevention and the care and rehabilitation of patients, both at individual and mass level, will help to create an international specialized database and a Webbased teleconsultation system. PMID:21991176

  12. Project Exodus

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Project Exodus is an in-depth study to identify and address the basic problems of a manned mission to Mars. The most important problems concern propulsion, life support, structure, trajectory, and finance. Exodus will employ a passenger ship, cargo ship, and landing craft for the journey to Mars. These three major components of the mission design are discussed separately. Within each component the design characteristics of structures, trajectory, and propulsion are addressed. The design characteristics of life support are mentioned only in those sections requiring it.

  13. SIMBIOS Project

    NASA Technical Reports Server (NTRS)

    Fargion, Giulietta S.; McClain, Charles R.

    2002-01-01

    The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. The SIMBIOS Science Team Principal Investigators' (PIs) original contributions to this report are in chapters four and above. The purpose of these contributions is to describe the current research status of the SIMBIOS-NRA-96 funded research. The contributions are published as submitted, with the exception of minor edits to correct obvious grammatical or clerical errors.

  14. PORTNUS Project

    SciTech Connect

    Loyal, Rebecca E.

    2015-07-14

    The objective of the Portunus Project is to create large, automated offshore ports that will the pace and scale of international trade. Additionally, these ports would increase the number of U.S. domestic trade vessels needed, as the imported goods would need to be transported from these offshore platforms to land-based ports such as Boston, Los Angeles, and Newark. Currently, domestic trade in the United States can only be conducted by vessels that abide by the Merchant Marine Act of 1920 – also referred to as the Jones Act. The Jones Act stipulates that vessels involved in domestic trade must be U.S. owned, U.S. built, and manned by a crew made up of U.S. citizens. The Portunus Project would increase the number of Jones Act vessels needed, which raises an interesting economic concern. Are Jones Act ships more expensive to operate than foreign vessels? Would it be more economically efficient to modify the Jones Act and allow vessels manned by foreign crews to engage in U.S. domestic trade? While opposition to altering the Jones Act is strong, it is important to consider the possibility that ship-owners who employ foreign crews will lobby for the chance to enter a growing domestic trade market. Their success would mean potential job loss for thousands of Americans currently employed in maritime trade.

  15. Project Explorer

    NASA Technical Reports Server (NTRS)

    Dannenberg, K. K.; Henderson, A.; Lee, J.; Smith, G.; Stluka, E.

    1984-01-01

    PROJECT EXPLORER is a program that will fly student-developed experiments onboard the Space Shuttle in NASA's Get-Away Special (GAS) containers. The program is co-sponsored by the Alabama Space and Rocket Center, the Alabama-Mississippi Section of the American Institute of Aeronautics and Astronautics, Alabama A&M University and requires extensive support by the University of Alabama in Huntsville. A unique feature of this project will demonstrate transmissions to ground stations on amateur radio frequencies in English language. Experiments Nos. 1, 2, and 3 use the microgravity of space flight to study the solidification of lead-antimony and aluminum-copper alloys, the growth of potassium-tetracyanoplatinate hydrate crystals in an aqueous solution, and the germination of radish seeds. Flight results will be compared with Earth-based data. Experiment No. 4 features radio transmission and will also provide timing for the start of all other experiments. A microprocessor will obtain real-time data from all experiments as well as temperature and pressure measurements taken inside the canister. These data will be transmitted on previously announced amateur radio frequencies after they have been converted into the English language by a digitalker for general reception.

  16. Project Exodus

    NASA Technical Reports Server (NTRS)

    Bryant, Rodney (Compiler); Dillon, Jennifer (Compiler); Grewe, George (Compiler); Mcmorrow, Jim (Compiler); Melton, Craig (Compiler); Rainey, Gerald (Compiler); Rinko, John (Compiler); Singh, David (Compiler); Yen, Tzu-Liang (Compiler)

    1990-01-01

    A design for a manned Mars mission, PROJECT EXODUS is presented. PROJECT EXODUS incorporates the design of a hypersonic waverider, cargo ship and NIMF (nuclear rocket using indigenous Martian fuel) shuttle lander to safely carry out a three to five month mission on the surface of Mars. The cargo ship transports return fuel, return engine, surface life support, NIMF shuttle, and the Mars base to low Mars orbit (LMO). The cargo ship is powered by a nuclear electric propulsion (NEP) system which allows the cargo ship to execute a spiral trajectory to Mars. The waverider transports ten astronauts to Mars and back. It is launched from the Space Station with propulsion provided by a chemical engine and a delta velocity of 9 km/sec. The waverider performs an aero-gravity assist maneuver through the atmosphere of Venus to obtain a deflection angle and increase in delta velocity. Once the waverider and cargo ship have docked the astronauts will detach the landing cargo capsules and nuclear electric power plant and remotely pilot them to the surface. They will then descend to the surface aboard the NIMF shuttle. A dome base will be quickly constructed on the surface and the astronauts will conduct an exploratory mission for three to five months. They will return to Earth and dock with the Space Station using the waverider.

  17. SISCAL project

    NASA Astrophysics Data System (ADS)

    Santer, Richard P.; Fell, Frank

    2003-05-01

    The first "ocean colour" sensor, Coastal Zone Color Scanner (CZCS), was launched in 1978. Oceanographers learnt a lot from CZCS but it remained a purely scientific sensor. In recent years, a new generation of satellite-borne earth observation (EO) instruments has been brought into space. These instruments combine high spectral and spatial resolution with revisiting rates of the order of one per day. More instruments with further increased spatial, spectral and temporal resolution will be available within the next years. In the meantime, evaluation procedures taking advantage of the capabilities of the new instruments were derived, allowing the retrieval of ecologically important parameters with higher accuracy than before. Space agencies are now able to collect and to process satellite data in real time and to disseminate them via the Internet. It is therefore meanwhile possible to envisage using EO operationally. In principle, a significant demand for EO data products on terrestrial or marine ecosystems exists both with public authorities (environmental protection, emergency management, natural resources management, national parks, regional planning, etc) and private companies (tourist industry, insurance companies, water suppliers, etc). However, for a number of reasons, many data products that can be derived from the new instruments and methods have not yet left the scientific community towards public or private end users. It is the intention of the proposed SISCAL (Satellite-based Information System on Coastal Areas and Lakes) project to contribute to the closure of the existing gap between space agencies and research institutions on one side and end users on the other side. To do so, we intend to create a data processor that automatically derives and subsequently delivers over the Internet, in Near-Real-Time (NRT), a number of data products tailored to individual end user needs. The data products will be generated using a Geographical Information System (GIS

  18. SISCAL project

    NASA Astrophysics Data System (ADS)

    Santer, Richard P.; Fell, Frank

    2003-05-01

    The first "ocean colour" sensor, Coastal Zone Color Scanner (CZCS), was launched in 1978. Oceanographers learnt a lot from CZCS but it remained a purely scientific sensor. In recent years, a new generation of satellite-borne earth observation (EO) instruments has been brought into space. These instruments combine high spectral and spatial resolution with revisiting rates of the order of one per day. More instruments with further increased spatial, spectral and temporal resolution will be available within the next years. In the meantime, evaluation procedures taking advantage of the capabilities of the new instruments were derived, allowing the retrieval of ecologically important parameters with higher accuracy than before. Space agencies are now able to collect and to process satellite data in real time and to disseminate them via the Internet. It is therefore meanwhile possible to envisage using EO operationally. In principle, a significant demand for EO data products on terrestrial or marine ecosystems exists both with public authorities (environmental protection, emergency management, natural resources management, national parks, regional planning, etc) and private companies (tourist industry, insurance companies, water suppliers, etc). However, for a number of reasons, many data products that can be derived from the new instruments and methods have not yet left the scientific community towards public or private end users. It is the intention of the proposed SISCAL (Satellite-based Information System on Coastal Areas and Lakes) project to contribute to the closure of the existing gap between space agencies and research institutions on one side and end users on the other side. To do so, we intend to create a data processor that automatically derives and subsequently delivers over the Internet, in Near-Real-Time (NRT), a number of data products tailored to individual end user needs. The data products will be generated using a Geographical Information System (GIS

  19. Project Grandmaster

    Energy Science and Technology Software Center (ESTSC)

    2013-09-16

    The purpose of the Project Grandmaster Application is to allow individuals to opt-in and give the application access to data sources about their activities on social media sites. The application will cross-reference these data sources to build up a picture of each individual activities they discuss, either at present or in the past, and place this picture in reference to groups of all participants. The goal is to allow an individual to place themselves inmore » the collective and to understand how their behavior patterns fit with the group and potentially find changes to make, such as activities they weren’t already aware of or different groups of interest they might want to follow.« less

  20. Apollo Project

    NASA Technical Reports Server (NTRS)

    1966-01-01

    From Spaceflight Revolution: 'Top NASA officials listen to a LOPO briefing at Langley in December 1966. Sitting to the far right with his hand on his chin is Floyd Thompson. To the left sits Dr. George Mueller, NASA associate administrator for Manned Space Flight. On the wall is a diagram of the sites selected for the 'concentrated mission.' 'The most fundamental issue in the pre-mission planning for Lunar Orbiter was how the moon was to be photographed. Would the photography be 'concentrated' on a predetermined single target, or would it be 'distributed' over several selected targets across the moon's surface? On the answer to this basic question depended the successful integration of the entire mission plan for Lunar Orbiter.' The Lunar Orbiter Project made systematic photographic maps of the lunar landing sites. Published in James R. Hansen, Spaceflight Revolution: NASA Langley Research Center From Sputnik to Apollo, (Washington: NASA, 1995), p. 337.

  1. Project Grandmaster

    SciTech Connect

    None, None

    2013-09-16

    The purpose of the Project Grandmaster Application is to allow individuals to opt-in and give the application access to data sources about their activities on social media sites. The application will cross-reference these data sources to build up a picture of each individual activities they discuss, either at present or in the past, and place this picture in reference to groups of all participants. The goal is to allow an individual to place themselves in the collective and to understand how their behavior patterns fit with the group and potentially find changes to make, such as activities they weren’t already aware of or different groups of interest they might want to follow.

  2. Apollo Project

    NASA Technical Reports Server (NTRS)

    1964-01-01

    Artists used paintbrushes and airbrushes to recreate the lunar surface on each of the four models comprising the LOLA simulator. Project LOLA or Lunar Orbit and Landing Approach was a simulator built at Langley to study problems related to landing on the lunar surface. It was a complex project that cost nearly $2 million dollars. James Hansen wrote: 'This simulator was designed to provide a pilot with a detailed visual encounter with the lunar surface; the machine consisted primarily of a cockpit, a closed-circuit TV system, and four large murals or scale models representing portions of the lunar surface as seen from various altitudes. The pilot in the cockpit moved along a track past these murals which would accustom him to the visual cues for controlling a spacecraft in the vicinity of the moon. Unfortunately, such a simulation--although great fun and quite aesthetic--was not helpful because flight in lunar orbit posed no special problems other than the rendezvous with the LEM, which the device did not simulate. Not long after the end of Apollo, the expensive machine was dismantled.' (p. 379) Ellis J. White further described LOLA in his paper 'Discussion of Three Typical Langley Research Center Simulation Programs,' 'Model 1 is a 20-foot-diameter sphere mounted on a rotating base and is scaled 1 in. = 9 miles. Models 2,3, and 4 are approximately 15x40 feet scaled sections of model 1. Model 4 is a scaled-up section of the Crater Alphonsus and the scale is 1 in. = 200 feet. All models are in full relief except the sphere.' Published in James R. Hansen, Spaceflight Revolution: NASA Langley Research Center From Sputnik to Apollo, (Washington: NASA, 1995), p. 379; From Ellis J. White, 'Discussion of Three Typical Langley Research Center Simulation Programs,' Paper presented at the Eastern Simulation Council (EAI's Princeton Computation Center), Princeton, NJ, October 20, 1966.

  3. Apollo Project

    NASA Technical Reports Server (NTRS)

    1965-01-01

    Artists used paintbrushes and airbrushes to recreate the lunar surface on each of the four models comprising the LOLA simulator. Project LOLA or Lunar Orbit and Landing Approach was a simulator built at Langley to study problems related to landing on the lunar surface. It was a complex project that cost nearly $2 million dollars. James Hansen wrote: 'This simulator was designed to provide a pilot with a detailed visual encounter with the lunar surface; the machine consisted primarily of a cockpit, a closed-circuit TV system, and four large murals or scale models representing portions of the lunar surface as seen from various altitudes. The pilot in the cockpit moved along a track past these murals which would accustom him to the visual cues for controlling a spacecraft in the vicinity of the moon. Unfortunately, such a simulation--although great fun and quite aesthetic--was not helpful because flight in lunar orbit posed no special problems other than the rendezvous with the LEM, which the device did not simulate. Not long after the end of Apollo, the expensive machine was dismantled.' (p. 379) Ellis J. White described the simulator as follows: 'Model 1 is a 20-foot-diameter sphere mounted on a rotating base and is scaled 1 in. = 9 miles. Models 2,3, and 4 are approximately 15x40 feet scaled sections of model 1. Model 4 is a scaled-up section of the Crater Alphonsus and the scale is 1 in. = 200 feet. All models are in full relief except the sphere.' Published in James R. Hansen, Spaceflight Revolution: NASA Langley Research Center From Sputnik to Apollo, (Washington: NASA, 1995), p. 379; Ellis J. White, 'Discussion of Three Typical Langley Research Center Simulation Programs,' Paper presented at the Eastern Simulation Council (EAI's Princeton Computation Center), Princeton, NJ, October 20, 1966.

  4. Apollo Project

    NASA Technical Reports Server (NTRS)

    1963-01-01

    Track, Model 2 and Model 1, the 20-foot sphere. Project LOLA or Lunar Orbit and Landing Approach was a simulator built at Langley to study problems related to landing on the lunar surface. It was a complex project that cost nearly $2 million dollars. James Hansen wrote: 'This simulator was designed to provide a pilot with a detailed visual encounter with the lunar surface; the machine consisted primarily of a cockpit, a closed-circuit TV system, and four large murals or scale models representing portions of the lunar surface as seen from various altitudes. The pilot in the cockpit moved along a track past these murals which would accustom him to the visual cues for controlling a spacecraft in the vicinity of the moon. Unfortunately, such a simulation--although great fun and quite aesthetic--was not helpful because flight in lunar orbit posed no special problems other than the rendezvous with the LEM, which the device did not simulate. Not long after the end of Apollo, the expensive machine was dismantled.' (p. 379) From Ellis J. White, 'Discussion of Three Typical Langley Research Center Simulation Programs,' Paper presented at the Eastern Simulation Council (EAI's Princeton Computation Center), Princeton, NJ, October 20, 1966. 'The model system is designed so that a television camera is mounted on a camera boom on each transport cart and each cart system is shared by two models. The cart's travel along the tracks represents longitudinal motion along the plane of a nominal orbit, vertical travel of the camera boom represents latitude on out-of-plane travel, and horizontal travel of the camera boom represents altitude changes.' Published in James R. Hansen, Spaceflight Revolution: NASA Langley Research Center From Sputnik to Apollo, (Washington: NASA, 1995), p. 379.

  5. Apollo Project

    NASA Technical Reports Server (NTRS)

    1964-01-01

    Artists used paintbrushes and airbrushes to recreate the lunar surface on each of the four models comprising the LOLA simulator. Project LOLA or Lunar Orbit and Landing Approach was a simulator built at Langley to study problems related to landing on the lunar surface. It was a complex project that cost nearly $2 million dollars. James Hansen wrote: 'This simulator was designed to provide a pilot with a detailed visual encounter with the lunar surface; the machine consisted primarily of a cockpit, a closed-circuit TV system, and four large murals or scale models representing portions of the lunar surface as seen from various altitudes. The pilot in the cockpit moved along a track past these murals which would accustom him to the visual cues for controlling a spacecraft in the vicinity of the moon. Unfortunately, such a simulation--although great fun and quite aesthetic--was not helpful because flight in lunar orbit posed no special problems other than the rendezvous with the LEM, which the device did not simulate. Not long after the end of Apollo, the expensive machine was dismantled.' (p. 379) Ellis J. White further described LOLA in his paper 'Discussion of Three Typical Langley Research Center Simulation Programs,' 'Model 1 is a 20-foot-diameter sphere mounted on a rotating base and is scaled 1 in. = 9 miles. Models 2,3, and 4 are approximately 15x40 feet scaled sections of model 1. Model 4 is a scaled-up section of the Crater Alphonsus and the scale is 1 in. = 200 feet. All models are in full relief except the sphere.' Published in James R. Hansen, Spaceflight Revolution: NASA Langley Research Center From Sputnik to Apollo, (Washington: NASA, 1995), p. 379; Ellis J. White, 'Discussion of Three Typical Langley Research Center Simulation Programs,' Paper presented at the Eastern Simulation Council (EAI's Princeton Computation Center), Princeton, NJ, October 20, 1966.

  6. Apollo Project

    NASA Technical Reports Server (NTRS)

    1964-01-01

    Construction of Model 1 used in the LOLA simulator. This was a twenty-foot sphere which simulated for the astronauts what the surface of the moon would look like from 200 miles up. Project LOLA or Lunar Orbit and Landing Approach was a simulator built at Langley to study problems related to landing on the lunar surface. It was a complex project that cost nearly $2 million dollars. James Hansen wrote: 'This simulator was designed to provide a pilot with a detailed visual encounter with the lunar surface; the machine consisted primarily of a cockpit, a closed-circuit TV system, and four large murals or scale models representing portions of the lunar surface as seen from various altitudes. The pilot in the cockpit moved along a track past these murals which would accustom him to the visual cues for controlling a spacecraft in the vicinity of the moon. Unfortunately, such a simulation--although great fun and quite aesthetic--was not helpful because flight in lunar orbit posed no special problems other than the rendezvous with the LEM, which the device did not simulate. Not long after the end of Apollo, the expensive machine was dismantled.' (p. 379) Ellis J. White wrote: 'Model 1 is a 20-foot-diameter sphere mounted on a rotating base and is scaled 1 in. = 9 miles. Models 2,3, and 4 are approximately 15x40 feet scaled sections of model 1. Model 4 is a scaled-up section of the Crater Alphonsus and the scale is 1 in. = 200 feet. All models are in full relief except the sphere.' Published in James R. Hansen, Spaceflight Revolution: NASA Langley Research Center From Sputnik to Apollo, (Washington: NASA, 1995), p. 379; Ellis J. White, 'Discussion of Three Typical Langley Research Center Simulation Programs,' Paper presented at the Eastern Simulation Council (EAI's Princeton Computation Center), Princeton, NJ, October 20, 1966.

  7. Apollo Project

    NASA Technical Reports Server (NTRS)

    1964-01-01

    Artists used paintbrushes and airbrushes to recreate the lunar surface on each of the four models comprising the LOLA simulator. Project LOLA or Lunar Orbit and Landing Approach was a simulator built at Langley to study problems related to landing on the lunar surface. It was a complex project that cost nearly $2 million dollars. James Hansen wrote: 'This simulator was designed to provide a pilot with a detailed visual encounter with the lunar surface; the machine consisted primarily of a cockpit, a closed-circuit TV system, and four large murals or scale models representing portions of the lunar surface as seen from various altitudes. The pilot in the cockpit moved along a track past these murals which would accustom him to the visual cues for controlling a spacecraft in the vicinity of the moon. Unfortunately, such a simulation--although great fun and quite aesthetic--was not helpful because flight in lunar orbit posed no special problems other than the rendezvous with the LEM, which the device did not simulate. Not long after the end of Apollo, the expensive machine was dismantled.' (p. 379) Ellis J. White further described LOLA in his paper 'Discussion of Three Typical Langley Research Center Simulation Programs,' 'Model 1 is a 20-foot-diameter sphere mounted on a rotating base and is scaled 1 in. = 9 miles. Models 2,3, and 4 are approximately 15x40 feet scaled sections of model 1. Model 4 is a scaled-up section of the Crater Alphonsus and the scale is 1 in. = 200 feet. All models are in full relief except the sphere.' Published in James R. Hansen, Spaceflight Revolution, NASA SP-4308, p. 379; Ellis J. White, 'Discussion of Three Typical Langley Research Center Simulation Programs,' Paper presented at the Eastern Simulation Council (EAI's Princeton Computation Center), Princeton, NJ, October 20, 1966.

  8. VIPER project

    NASA Technical Reports Server (NTRS)

    Kershaw, John

    1990-01-01

    The VIPER project has so far produced a formal specification of a 32 bit RISC microprocessor, an implementation of that chip in radiation-hard SOS technology, a partial proof of correctness of the implementation which is still being extended, and a large body of supporting software. The time has now come to consider what has been achieved and what directions should be pursued in the future. The most obvious lesson from the VIPER project was the time and effort needed to use formal methods properly. Most of the problems arose in the interfaces between different formalisms, e.g., between the (informal) English description and the HOL spec, between the block-level spec in HOL and the equivalent in ELLA needed by the low-level CAD tools. These interfaces need to be made rigorous or (better) eliminated. VIPER 1A (the latest chip) is designed to operate in pairs, to give protection against breakdowns in service as well as design faults. We have come to regard redundancy and formal design methods as complementary, the one to guard against normal component failures and the other to provide insurance against the risk of the common-cause failures which bedevil reliability predictions. Any future VIPER chips will certainly need improved performance to keep up with increasingly demanding applications. We have a prototype design (not yet specified formally) which includes 32 and 64 bit multiply, instruction pre-fetch, more efficient interface timing, and a new instruction to allow a quick response to peripheral requests. Work is under way to specify this device in MIRANDA, and then to refine the spec into a block-level design by top-down transformations. When the refinement is complete, a relatively simple proof checker should be able to demonstrate its correctness. This paper is presented in viewgraph form.

  9. Ace Project as a Project Management Tool

    ERIC Educational Resources Information Center

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  10. Project Longshot

    NASA Technical Reports Server (NTRS)

    West, J. Curtis; Chamberlain, Sally A.; Stevens, Robert; Pagan, Neftali

    1989-01-01

    Project Longshot is an unmanned probe to our nearest star system, Alpha Centauri, 4.3 light years away. The Centauri system is a trinary system consisting of two central stars (A and B) orbiting a barycenter, and a third (Proxima Centauri) orbiting the two. The system is a declination of -67 degrees. The goal is to reach the Centauri system in 50 years. This time space was chosen because any shorter time would be impossible of the relativistic velocities involved, and any greater time would be impossible because of the difficulty of creating a spacecraft with such a long lifetime. Therefore, the following mission profile is proposed: (1) spacecraft is assembled in Earth orbit; (2) spacecraft escapes Earth and Sun in the ecliptic with a single impulse maneuver; (3) spacecraft changed declination to point toward Centauri system; (4) spacecraft accelerates to 0.1c; (5) spacecraft coasts at 0.1c for 41 years; (6) spacecraft decelerates upon reaching Centauri system; and (7) spacecraft orbits Centauri system, conducts investigations, and relays data to Earth. The total time to reach the Centauri system, taking into consideration acceleration and deceleration, will be approximately 50 years.

  11. Project LASER

    NASA Technical Reports Server (NTRS)

    1990-01-01

    NASA formally launched Project LASER (Learning About Science, Engineering and Research) in March 1990, a program designed to help teachers improve science and mathematics education and to provide 'hands on' experiences. It featured the first LASER Mobile Teacher Resource Center (MTRC), is designed to reach educators all over the nation. NASA hopes to operate several MTRCs with funds provided by private industry. The mobile unit is a 22-ton tractor-trailer stocked with NASA educational publications and outfitted with six work stations. Each work station, which can accommodate two teachers at a time, has a computer providing access to NASA Spacelink. Each also has video recorders and photocopy/photographic equipment for the teacher's use. MTRC is only one of the five major elements within LASER. The others are: a Space Technology Course, to promote integration of space science studies with traditional courses; the Volunteer Databank, in which NASA employees are encouraged to volunteer as tutors, instructors, etc; Mobile Discovery Laboratories that will carry simple laboratory equipment and computers to provide hands-on activities for students and demonstrations of classroom activities for teachers; and the Public Library Science Program which will present library based science and math programs.

  12. Project Information Packages Kit.

    ERIC Educational Resources Information Center

    RMC Research Corp., Mountain View, CA.

    Presented are an overview booklet, a project selection guide, and six Project Information Packages (PIPs) for six exemplary projects serving underachieving students in grades k through 9. The overview booklet outlines the PIP projects and includes a chart of major project features. A project selection guide reviews the PIP history, PIP contents,…

  13. RESOLVE Project

    NASA Technical Reports Server (NTRS)

    Parker, Ray; Coan, Mary; Cryderman, Kate; Captain, Janine

    2013-01-01

    The RESOLVE project is a lunar prospecting mission whose primary goal is to characterize water and other volatiles in lunar regolith. The Lunar Advanced Volatiles Analysis (LAVA) subsystem is comprised of a fluid subsystem that transports flow to the gas chromatograph - mass spectrometer (GC-MS) instruments that characterize volatiles and the Water Droplet Demonstration (WDD) that will capture and display water condensation in the gas stream. The LAVA Engineering Test Unit (ETU) is undergoing risk reduction testing this summer and fall within a vacuum chamber to understand and characterize component and integrated system performance. Testing of line heaters, printed circuit heaters, pressure transducers, temperature sensors, regulators, and valves in atmospheric and vacuum environments was done. Test procedures were developed to guide experimental tests and test reports to analyze and draw conclusions from the data. In addition, knowledge and experience was gained with preparing a vacuum chamber with fluid and electrical connections. Further testing will include integrated testing of the fluid subsystem with the gas supply system, near-infrared spectrometer, WDD, Sample Delivery System, and GC-MS in the vacuum chamber. This testing will provide hands-on exposure to a flight forward spaceflight subsystem, the processes associated with testing equipment in a vacuum chamber, and experience working in a laboratory setting. Examples of specific analysis conducted include: pneumatic analysis to calculate the WDD's efficiency at extracting water vapor from the gas stream to form condensation; thermal analysis of the conduction and radiation along a line connecting two thermal masses; and proportional-integral-derivative (PID) heater control analysis. Since LAVA is a scientific subsystem, the near-infrared spectrometer and GC-MS instruments will be tested during the ETU testing phase.

  14. Project summary

    NASA Technical Reports Server (NTRS)

    1991-01-01

    California Polytechnic State University's design project for the 1990-91 school year was the design of a close air support aircraft. There were eight design groups that participated and were given requests for proposals. These proposals contained mission specifications, particular performance and payload requirements, as well as the main design drivers. The mission specifications called for a single pilot weighing 225 lb with equipment. The design mission profile consisted of the following: (1) warm-up, taxi, take off, and accelerate to cruise speed; (2) dash at sea level at 500 knots to a point 250 nmi from take off; (3) combat phase, requiring two combat passes at 450 knots that each consist of a 360 deg turn and an energy increase of 4000 ft. - at each pass, half of air-to-surface ordnance is released; (4) dash at sea level at 500 knots 250 nmi back to base; and (5) land with 20 min of reserve fuel. The request for proposal also specified the following performance requirements with 50 percent internal fuel and standard stores: (1) the aircraft must be able to accelerate from Mach 0.3 to 0.5 at sea level in less than 20 sec; (2) required turn rates are 4.5 sustained g at 450 knots at sea level; (3) the aircraft must have a reattack time of 25 sec or less (reattack time was defined as the time between the first and second weapon drops); (4) the aircraft is allowed a maximum take off and landing ground roll of 2000 ft. The payload requirements were 20 Mk 82 general-purpose free-fall bombs and racks; 1 GAU-8A 30-mm cannon with 1350 rounds; and 2 AIM-9L Sidewinder missiles and racks. The main design drivers expressed in the request for proposal were that the aircraft should be survivable and maintainable. It must be able to operate in remote areas with little or no maintenance. Simplicity was considered the most important factor in achieving the former goal. In addition, the aircraft must be low cost both in acquisition and operation. The summaries of the aircraft

  15. RESOLVE Project

    NASA Technical Reports Server (NTRS)

    Parker, Ray O.

    2012-01-01

    The RESOLVE project is a lunar prospecting mission whose primary goal is to characterize water and other volatiles in lunar regolith. The Lunar Advanced Volatiles Analysis (LAVA) subsystem is comprised of a fluid subsystem that transports flow to the gas chromatograph- mass spectrometer (GC-MS) instruments that characterize volatiles and the Water Droplet Demonstration (WDD) that will capture and display water condensation in the gas stream. The LAVA Engineering Test Unit (ETU) is undergoing risk reduction testing this summer and fall within a vacuum chamber to understand and characterize C!Jmponent and integrated system performance. Ray will be assisting with component testing of line heaters, printed circuit heaters, pressure transducers, temperature sensors, regulators, and valves in atmospheric and vacuum environments. He will be developing procedures to guide these tests and test reports to analyze and draw conclusions from the data. In addition, he will gain experience with preparing a vacuum chamber with fluid and electrical connections. Further testing will include integrated testing of the fluid subsystem with the gas supply system, near-infrared spectrometer, WDD, Sample Delivery System, and GC-MS in the vacuum chamber. This testing will provide hands-on exposure to a flight forward spaceflight subsystem, the processes associated with testing equipment in a vacuum chamber, and experience working in a laboratory setting. Examples of specific analysis Ray will conduct include: pneumatic analysis to calculate the WOO's efficiency at extracting water vapor from the gas stream to form condensation; thermal analysis of the conduction and radiation along a line connecting two thermal masses; and proportional-integral-derivative (PID) heater control analysis. In this Research and Technology environment, Ray will be asked to problem solve real-time as issues arise. Since LAVA is a scientific subsystem, Ray will be utilizing his chemical engineering background to

  16. Revision curricular a partir de un analisis comparativo de las discrepancias en los curriculos de una escuela de optometria en Puerto Rico con las competencias requeridas para las agencias de revalida y acreditacion 2004

    NASA Astrophysics Data System (ADS)

    Rivera Pacheco, Andres

    El proposito de esta investigacion, un estudio cualitativo de caso, fue comparar y contrastar el curriculo vigente de la Escuela de Optometria de la UIAPR con las competencias y estandares requeridos por las agencias de acreditacion y de revalida. Con este proposito, decidimos realizar una revision y un analisis de documentos: el prontuario de cada uno de los cursos de los curriculos implantados en el 1993 y en el 2001; las competencias y estandares establecidos por las agencias de revalida y de acreditacion; y las estadisticas en las que se analiza el porcentaje de estudiantes que aprueban cada una de las partes de los examenes de revalida entre el 1998 al 2003. Se realizaron entrevistas dirigidas para dar apoyo y complementar la revision y el analisis de estos documentos. Los participantes de las entrevistas fueron tres estudiantes de la clase de optometria del 2004 (ultima clase del curriculo del 1993); tres estudiantes de la clase de optometria del 2005 (primera clase graduanda del curriculo vigente) y tres profesores y/o directores de los Departamentos de Ciencias Basicas, Ciencias Clinicas y Cuidado al Paciente. Esta investigacion se enmarco en el modelo de evaluacion curricular de discrepancia de Malcolm Provus y en el modelo de desarrollo basado en competencias. Uno de los hallazgos mas importantes del estudio es que los cambios que se implantaron al curriculo del 2001 no han logrado que los estudiantes mejoren su ejecucion en los examenes de revalida. Por otro lado, se encontro que el curriculo vigente atiende completamente los estandares de la practica de Optometria, pero no las competencias. Esta informacion fue validada mediante el uso de una tabla de cotejo para el analisis de los cursos y de la informacion obtenida de las entrevistas. El estudio determina y concluye que existen discrepancias entre los prontuarios de los cursos del curriculo y las competencias requeridas por la agencia de revalida. Segundo, que el Departamento de Ciencias Basicas es el

  17. Integrated Project Management System description. [UMTRAP Project

    SciTech Connect

    Not Available

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office ( Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs.

  18. The Hairy Head Project.

    ERIC Educational Resources Information Center

    Gallick, Barbara

    A class of 3- to 6-year-old children in a Midwestern child care center chose to study hair and hairstyling salons as a group project. This article discusses how the project evolved, describes the three phases of the project, and provides the teacher's reflections on the project. Photos taken during the project are included. (Author)

  19. Project CREST, Gainesville, Florida. An Exemplary Project.

    ERIC Educational Resources Information Center

    DeJong, William; Stewart, Carolyn

    This manual describes Project CREST (Clinical Regional Support Teams), a community project established in Gainesville, Florida, to supplement State probation services by providing professional counseling to delinquent youth. The project uses a dual treatment approach in which, on the one hand, probation officers impose restrictions, while on the…

  20. Managing Projects for Change: Contextualised Project Management

    ERIC Educational Resources Information Center

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  1. Project Panama: An International Service Project

    ERIC Educational Resources Information Center

    Aydlett, Lydia; Randolph, Mickey; Wells, Gayle

    2010-01-01

    Participation in service learning projects is a growing phenomenon at universities and colleges. Research indicates service projects are beneficial for college students and adults. There is little data investigating developmental differences in how younger versus older participants perceive the service learning process. In this project, older…

  2. Elementary School Projects.

    ERIC Educational Resources Information Center

    Learning By Design, 2001

    2001-01-01

    Highlights elementary school construction projects that have won the Learning By Design Awards for 2001. Projects covered involve new school construction; and renovation, additions, and restoration. (GR)

  3. eProject Builder

    Energy Science and Technology Software Center (ESTSC)

    2014-06-01

    eProject Builder enables Energy Services Companies (ESCOs) and their contracting agencies to: 1. upload and track project-level Information 2. generate basic project reports required by local, state, and/or federal agencies 3. benchmark new Energy Savings Performance Contract (ESPC) projects against historical data

  4. The 100 People Project

    ERIC Educational Resources Information Center

    McLeod, Keri

    2007-01-01

    This article describes the 100 People Project and how the author integrates the project in her class. The 100 People Project is a nonprofit organization based in New York City. The organization poses the question: If there were only 100 people in the world, what would the world look like? Through the project, students were taught about ethics in…

  5. Determinants of project success

    NASA Technical Reports Server (NTRS)

    Murphy, D. C.; Baker, B. N.; Fisher, D.

    1974-01-01

    The interactions of numerous project characteristics, with particular reference to project performance, were studied. Determinants of success are identified along with the accompanying implications for client organization, parent organization, project organization, and future research. Variables are selected which are found to have the greatest impact on project outcome, and the methodology and analytic techniques to be employed in identification of those variables are discussed.

  6. Korea's School Grounds Projects

    ERIC Educational Resources Information Center

    Park, Joohun

    2003-01-01

    This article describes two projects which Korea has undertaken to improve its school grounds: (1) the Green School Project; and (2) the School Forest Pilot Project. The Korean Ministry of Education and Human Resources Development (MOE&HRI) recently launched the Green School Project centred on existing urban schools with poor outdoor environments.…

  7. NCMS ESS 2000 Project

    NASA Technical Reports Server (NTRS)

    Gibbel, Mark; Bellamy, Marvin; DeSantis, Charlie; Hess, John; Pattok, Tracy; Quintero, Andrew; Silver, R.

    1996-01-01

    ESS 2000 has the vision of enhancing the knowledge necessary to implement cost-effective, leading-edge ESS technologies and procedures in order to increase U.S. electronics industry competitiveness. This paper defines EES and discusses the factors driving the project, the objectives of the project, its participants, the three phases of the project, the technologies involved, and project deliverables.

  8. Earth System Science Project

    ERIC Educational Resources Information Center

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  9. Project Lodestar Special Report.

    ERIC Educational Resources Information Center

    Brown, Peggy, Ed.

    1981-01-01

    The Association of American Colleges' (AAC) Project Lodestar is addressed in an article and descriptions of the pilot phase of the project at 13 institutions. In "Project Lodestar: Realistically Assessing the Future," Peggy Brown provides an overview of the project, which is designed to help colleges and universities in assessment of institutional…

  10. Project Follow Through.

    ERIC Educational Resources Information Center

    Illinois State Office of the Superintendent of Public Instruction, Springfield. Dept. for Exceptional Children.

    The four Follow Through projects in Illinois are described and evaluated. These projects involve approximately 1,450 children in K-3 in Mounds, East Saint Louis, Waukegan, and Chicago. The Chicago project is subdivided into three individual projects and is trying three experimental programs. Emphasis is given to the nature of the environmental…

  11. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  12. NSF Funded Projects: Perspectives of Project Leaders.

    ERIC Educational Resources Information Center

    Custer, Rodney L.; Loepp, Franzie; Martin, G. Eugene

    2000-01-01

    A survey of 23 principal investigators of National Science Foundation-funded projects identified the chief facilitating factor to be direct contact with program officers. They had difficulties conceptualizing and envisioning their projects, finding time and confidence for writing proposals, and dealing with the complexity of the guidelines and the…

  13. Canadian Urban Dynamics Project. Project Canada West.

    ERIC Educational Resources Information Center

    Western Curriculum Project on Canada Studies, Edmonton (Alberta).

    This is a progress report of a curriculum development project aimed at involving students in community and regional development by creating an awareness of urban problems and instilling a sense of positive self worth and capability which will stimulate active community participation. Initial planning of the project is reported in ED 055 017. The…

  14. Analisis parametrico de las variables que influyen en el comportamiento adherente de las armaduras pretesas en el hormigon

    NASA Astrophysics Data System (ADS)

    Arbelaez Jaramillo, Cesar Augusto

    Prestressed concrete technique through the use of prestressed reinforcement is extended in the precast concrete industry. This technique consists on casting a concrete element over a previously prestressed reinforcement, proceeding to release once the concrete has reached a determined strength so the prestressed stress introduced to the reinforcement be transmitted, by bond, to concrete. The bond behaviour of prestressed reinforcement includes two phenomena: prestress transmission from the reinforcement to concrete and anchorage of the reinforcement. This bond behaviour is characterized by mean of two lengths: transmission length and anchorage length. The good design of these lengths is a basic and fundamental aspect in the project of precast prestressed concrete elements to guaranty the appropriate transmission of prestress and to allow the anchorage of the reinforcement along the structural element service life. The influence of the parameters related to the concrete dosage on the transmission and anchorage lengths of prestressing strands have been analyzed. The ECADA test method has been applied. With this method the operations of transmission of prestress and anchorage of the reinforcement are sequentially done. The transmission and anchorage lengths are determined from the force control supported by the reinforcement testing series of specimens with different embedment lengths. The differentiation of the concepts of anchorage length without slips and with slips has been proposed. The relationship of the parameters of dosage with the bond stress and the registered slips during the processes of transmission and anchorage has been studied. Expressions to value the slips distribution of the reinforcement in the transmission zone and in the anchorage zone have been proposed. A study on the determination of the transmission length from the free reinforcement slip end has been done and the viability to experimentally determine the transmission length from the slips

  15. The Alzheimer's Project

    MedlinePlus

    ... Bar Home Current Issue Past Issues The Alzheimer's Project Past Issues / Spring 2009 Table of Contents For ... this page please turn Javascript on. The Alzheimer's Project A 4-Part Documentary Series Starting May 10 ...

  16. Elective Program Projects

    ERIC Educational Resources Information Center

    Estrada, Christelle

    1976-01-01

    Outlined is an interdisciplinary program in Ecology and Oceanography for grades six through eight. Numerous student projects are suggested in the outline and the course requirements and the project system are explained. (MA)

  17. Venezuela's Bolivarian Schools Project.

    ERIC Educational Resources Information Center

    Diaz, Maria Magnolia Santamaria

    2002-01-01

    Discusses efforts by the Venezuelan government to improve the nation's school infrastructure through the Bolivarian Schools Project administered by the Ministry of Education, Culture and Sport. The project set educational principles which are guiding current school building efforts. (EV)

  18. The Alzheimer's Project

    MedlinePlus

    ... Navigation Bar Home Current Issue Past Issues The Alzheimer's Project Past Issues / Spring 2009 Table of Contents ... of this page please turn Javascript on. The Alzheimer's Project A 4-Part Documentary Series Starting May ...

  19. GHPsRUS Project

    DOE Data Explorer

    Battocletti, Liz

    2013-07-09

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  20. The Proposal Project

    ERIC Educational Resources Information Center

    Pierce, Elizabeth

    2007-01-01

    The proposal project stretches over a significant portion of the semester-long sophomore course Professional Communication (ENG 250) at Monroe Community College. While developing their proposal project, students need to use time management skills to successfully complete a quality project on time. In addition, excellent oral and written…

  1. Kansas Advanced Semiconductor Project

    SciTech Connect

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-09-21

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  2. Library Digitisation Project Management.

    ERIC Educational Resources Information Center

    Middleton, Michael

    Supervision of library digitization is the focus of this paper. First outlined are the definition, formalization, implementation, and completion phases of project management. Descriptions of management decisions involved in digitization projects follow on matters such as: collection analysis, resourcing, project personnel, production, access and…

  3. The Sidewalk Project

    ERIC Educational Resources Information Center

    Church, William

    2005-01-01

    In this article, the author features "the sidewalk project" in Littleton High School. The sidewalk project is a collaboration of more than 40 high school physics students, 10 local mentors, and a few regional and national organizations who worked together to invent a way to heat a sidewalk with an alternative energy source. The project, which…

  4. Project ASTRO: A Partnership.

    ERIC Educational Resources Information Center

    Rothenberger, Lisa

    2001-01-01

    Describes a project that enriches astronomy lessons with hands-on activities facilitated by an astronomer. The project links professional and amateur astronomers with middle-level classroom teachers and informal educators. Families and community organizations are also involved in the project. Provides information on how to join the ASTRO network.…

  5. Ideas for Science Projects.

    ERIC Educational Resources Information Center

    Showalter, Victor; Slesnick, Irwin

    This booklet was written for students as a source of ideas for research type science projects. Part One shows how three high school students developed individual projects a s a result of asking questions about the same natural phenomena. Part Two contains project suggestions and sample questions designed to stimulate student thinking along…

  6. Toll Gate Metrication Project

    ERIC Educational Resources Information Center

    Izzi, John

    1974-01-01

    The project director of the Toll Gate Metrication Project describes the project as the first structured United States public school educational experiment in implementing change toward the adoption of the International System of Units. He believes the change will simplify, rather than complicate, the educational task. (AG)

  7. Visible Human Project

    MedlinePlus

    ... Mobile Gallery Site Navigation Home The Visible Human Project ® Overview The Visible Human Project ® is an outgrowth of the NLM's 1986 Long- ... The long-term goal of the Visible Human Project ® is to produce a system of knowledge structures ...

  8. THE ATLANTA SUPERSITE PROJECT

    EPA Science Inventory

    The Atlanta Supersites project is the first of two Supersites projects to be established during Phase I of EPA's Supersites Program; Phase 11 is being established through a Request for Assistance. The other initial project is in Fresno, California. The Supersites Program is par...

  9. Of Principals and Projects.

    ERIC Educational Resources Information Center

    Wyant, Spencer H.; And Others

    Principals play an important role in the success of externally funded change projects in their schools. Interviews exploring the participation of principals in such projects in 14 Oregon elementary and secondary schools provided 11 case studies illustrating helpful and unhelpful behaviors. The projects were found to have life cycles of their own,…

  10. Humane Education Projects Handbook.

    ERIC Educational Resources Information Center

    Junior League of Ogden, UT.

    This handbook was developed to promote interest in humane education and to encourage the adoption of humane education projects. Although specifically designed to assist Junior Leagues in developing such projects, the content should prove valuable to animal welfare organizations, zoos, aquariums, nature centers, and other project-oriented groups…

  11. The Eggen Card Project

    NASA Astrophysics Data System (ADS)

    Silvis, G.

    2014-06-01

    (Abstract only) Olin Eggen, noted astronomer (1919-1998), left to us all his raw observation records recorded on 3x5 cards. This project is to make all this data available as an online resource. History and progress of the project will be presented. Project details available at: https://sites.google.com/site/eggencards/home.

  12. Projection: A Bibliography.

    ERIC Educational Resources Information Center

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  13. The Illinois Rivers Project.

    ERIC Educational Resources Information Center

    Williams, Robert A.; And Others

    The Illinois Rivers Project was developed as an integrated, multidimensional science/technology/society pilot project designed to introduce water quality dimensions into Illinois high schools. The project involved high school science, social science, and English teachers in an integrated study of their local river and community. Science students…

  14. Underestimation of Project Costs

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  15. Managing Projects with KPRO

    NASA Technical Reports Server (NTRS)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  16. ALS Project Management Manual

    SciTech Connect

    Krupnick, Jim; Harkins, Joe

    2000-05-01

    This manual has been prepared to help establish a consistent baseline of management practices across all ALS projects. It describes the initial process of planning a project, with a specific focus on the production of a formal project plan. We feel that the primary weakness in ALS project management efforts to date stems from a failure to appreciate the importance of ''up-front'' project planning. In this document, we present a guide (with examples) to preparing the documents necessary to properly plan, monitor, and control a project's activities. While following the manual will certainly not guarantee good project management, failure to address the issues we raise will dramatically reduce the chance of success. Here we define success as meeting the technical goals on schedule and within the prescribed budget.

  17. Project Surveillance and Maintenance Plan. [UMTRA Project

    SciTech Connect

    Not Available

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

  18. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  19. Pine Hollow Watershed Project : FY 2000 Projects.

    SciTech Connect

    Sherman County Soil and Water Conservation District

    2001-06-01

    The Pine Hollow Project (1999-010-00) is an on-going watershed restoration effort administered by Sherman County Soil and Water Conservation District and spearheaded by Pine Hollow/Jackknife Watershed Council. The headwaters are located near Shaniko in Wasco County, and the mouth is in Sherman County on the John Day River. Pine Hollow provides more than 20 miles of potential summer steelhead spawning and rearing habitat. The watershed is 92,000 acres. Land use is mostly range, with some dryland grain. There are no water rights on Pine Hollow. Due to shallow soils, the watershed is prone to rapid runoff events which scour out the streambed and the riparian vegetation. This project seeks to improve the quality of upland, riparian and in-stream habitat by restoring the natural hydrologic function of the entire watershed. Project implementation to date has consisted of construction of water/sediment control basins, gradient terraces on croplands, pasture cross-fences, upland water sources, and grass seeding on degraded sites, many of which were crop fields in the early part of the century. The project is expected to continue through about 2007. From March 2000 to June 2001, the Pine Hollow Project built 6 sediment basins, 1 cross-fence, 2 spring developments, 1 well development, 1 solar pump, 50 acres of native range seeding and 1 livestock waterline. FY2000 projects were funded by BPA, Oregon Watershed Enhancement Board, US Fish and Wildlife Service and landowners. In-kind services were provided by Sherman County Soil and Water Conservation District, USDA Natural Resources Conservation Service, USDI Bureau of Land Management, Oregon Department of Fish and Wildlife, Pine Hollow/Jackknife Watershed Council, landowners and Wasco County Soil and Water Conservation District.

  20. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    ERIC Educational Resources Information Center

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  1. Battleground Energy Recovery Project

    SciTech Connect

    Bullock, Daniel

    2011-12-31

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and Create a Showcase Waste Heat Recovery Demonstration Project.

  2. Orion Project Status Report

    NASA Astrophysics Data System (ADS)

    Stiewing, Albert; Hopkins, Jeffrey L.

    2015-05-01

    Originally started in 2012 as the Betelgeuse Project, interest in the other bright stars of Orion soon expanded the Project stars to include a total of six of the brightest stars in Orion. The name was then changed to the Orion Project. Orion is one of the most famous constellations. Its declination along the celestial equator is such that it is visible from most of northern and southern hemispheres. In addition, the stars of Orion are very bright and interesting. The Orion Project now includes the stars Betelgeuse, Rigel, Saiph and the three stars of Orion's belt, Mintaka, Alnilam and Alnitak. The projects objectives are both to help the observer produce quality photometric and spectroscopic data and to produce archival quality photometric (BVRIJH bands) and spectroscopy (low, mid and high-resolution) data. This paper is a summary of the Orion Project status.

  3. Project GlobWave

    NASA Astrophysics Data System (ADS)

    Busswell, Geoff; Ash, Ellis; Piolle, Jean-Francois; Poulter, David J. S.; Snaith, Helen; Collard, Fabrice; Sheera, Harjit; Pinnock, Simon

    2010-12-01

    The ESA GlobWave project is a three year initiative, funded by ESA and CNES, to service the needs of satellite wave product users across the globe. Led by Logica UK, with support from CLS, IFREMER, SatOC and NOCS, the project will provide free access to satellite wave data and products in a common format, both historical and in near real time, from various European and American SAR and altimeter missions. Building on the successes of similar projects for Sea Surface Temperature and ocean colour, the project aims to stimulate increased use and analysis of satellite wave products. In addition to common-format satellite data the project will provide comparisons with in situ measurements, interactive data analysis tools and a pilot spatial wave forecast verification scheme for operational forecast production centres. The project will begin operations in January 2010, with direction from regular structured user consultation.

  4. Operational waste volume projection

    SciTech Connect

    Koreski, G.M.; Strode, J.N.

    1995-06-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the tri-party agreement. Assumptions are current as of June 1995.

  5. Operational Waste Volume Projection

    SciTech Connect

    STRODE, J.N.

    1999-08-24

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  6. Spin projection chromatography

    NASA Astrophysics Data System (ADS)

    Danieli, E. P.; Pastawski, H. M.; Levstein, P. R.

    2004-01-01

    We formulate the many-body spin dynamics at high temperature within the non-equilibrium Keldysh formalism. For the simplest XY interaction, analytical expressions in terms of the one particle solutions are obtained for linear and ring configurations. For small rings of even spin number, the group velocities of excitations depend on the parity of the total spin projection. This should enable a dynamical filtering of spin projections with a given parity i.e., a spin projection chromatography.

  7. Microwave solidification project overview

    SciTech Connect

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included.

  8. KSC History Project

    NASA Technical Reports Server (NTRS)

    Snaples, Lee

    2001-01-01

    The project is a joint endeavor between Dr. Henry Dethloff and myself and is producing a number of products related to KSC history. This report is a summary of those projects. First, there is an overview monograph covering KSC history. Second, there is a chapter outline for an eventual book-length history. Third, there is monograph on safety at KSC. Finally, there is a web page and database dedicated to the KSC oral history project.

  9. Computer Assets Recovery Project

    NASA Technical Reports Server (NTRS)

    CortesPena, Aida Yoguely

    2010-01-01

    This document reports on the project that was performed during the internship of the author. The project involved locating and recovering machines in various locations that Boeing has no need for, and therefore requires that they be transferred to another user or transferred to a non-profit organization. Other projects that the author performed was an inventory of toner and printers, loading new computers and connecting them to the network.

  10. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  11. KSC History Project

    NASA Technical Reports Server (NTRS)

    Dethloff, Henry C.

    2001-01-01

    The KSC History Project focuses on archival research and oral history interviews on the history of Kennedy Space Center (KSC). Related projects include the preparation of a precis and chapter outline for a proposed book-length narrative history, a bibliography of key primary and secondary resources, a brief monograph overview of the history of KSC, and a monograph on the history of safety at the Center. Finally, there is work on the development of a web page and a personal history data base associated with the oral history project. The KSC History Project has been a joint endeavor between Henry C. Dethloff and Dr. Noble Lee Snaples, Jr.

  12. Project Worm Bin.

    ERIC Educational Resources Information Center

    McGuire, Daniel C.

    1987-01-01

    Describes a project centering around earthworm activity in a compost bin. Includes suggestions for exercises involving biological and conservation concepts, gardening skills, and dramatical presentations. (ML)

  13. Manpower and project planning

    NASA Technical Reports Server (NTRS)

    Johnson, David W.

    1991-01-01

    The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

  14. Other School Projects.

    ERIC Educational Resources Information Center

    Learning By Design, 2001

    2001-01-01

    Highlights selected construction projects for learning centers, early childhood and development schools, and special purpose educational facilities that have won the Learning By Design Awards for 2001.(GR)

  15. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  16. FLEXI Project Management Survey

    NASA Astrophysics Data System (ADS)

    Rohunen, Anna; Krzanik, Lech; Kuvaja, Pasi; Similä, Jouni; Rodriguez, Pilar; Hyysalo, Jarkko; Linna, Tommi

    FLEXI Project Management Survey (FLEXI PMS) has been established to gain detailed knowledge on how the software industry - in particular successful companies - manages agile software development. FLEXI PMS investigates the actual agile values, principles, practices and contexts. The survey is supported by a careful literature review and analysis of existing studies. Special attention is attached to large, multi-site, multi-company and distributed projects - the target area of FLEXI project. The survey is intended to provide solid data for further knowledge acquisition and project/company positioning with regard to feasible agile management practices.

  17. Comparison of time series of integrated water vapor measured using radiosonde, GPS and microwave radiometer at the CNR-IMAA Atmospheric Observatory

    NASA Astrophysics Data System (ADS)

    Amato, Franceso; Rosoldi, Marco; Madonna, Fabio

    2015-04-01

    Information about the amount and spatial distribution of atmospheric water vapor is essential to improve our knowledge of weather forecasting and climate change. Water vapor is highly variable in space and time depending on the complex interplay of several phenomena like convection, precipitation, turbulence, etc. It remains one of the most poorly characterized meteorological parameters. Remarkable progress in using of Global Navigation Satellite Systems (GNSS), in particular GPS, for the monitoring of atmospheric water vapor has been achieved during the last decades. Various studies have demonstrated that GPS could provide accurate water vapor estimates for the study of the atmosphere. Different GPS data processing provided within the scientific community made use of various tropospheric models that primarily differs for the assumptions on the vertical refractivity profiles and the mapping of the vertical delay with elevation angles. This works compares several models based on the use of surface meteorological data. In order to calculate the Integrated Water Vapour (IWV), an algorithm for calculating the zenith tropospheric delay was implemented. It is based upon different mapping functions (Niell, Saastamoinen, Chao and Herring Mapping Functions). Observations are performed at the Istituto di Metodologie per l'Analisi Ambientale (IMAA) GPS station located in Tito Scalo, Potenza (40.60N, 15.72E), from July to December 2014, in the framework of OSCAR project (Observation System for Climate Application at Regional scale). The retrieved values of the IWV using the GPS are systematically compared with the other estimation of IWV collected at CIAO (CNR-IMAA Atmospheric Observatory) using the other available measurement techniques. In particular, in this work the compared IWV are retrieved from: 1. a Trimble GPS antenna (data processed by the GPS-Met network, see gpsmet.nooa.gov); 2. a Novatel GPS antenna (data locally processed using a software developed at CIAO); 3

  18. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  19. Basalt Waste Isolation Project Reclamation Support Project:

    SciTech Connect

    Brandt, C.A.; Rickard, W.H. Jr.; Cadoret, N.A.

    1992-06-01

    The Basalt Waste Isolation Project (BWIP) Reclamation Support Project began in the spring of 1988 by categorizing sites distributed during operations of the BWIP into those requiring revegetation and those to be abandoned or transferred to other programs. The Pacific Northwest Laboratory's role in this project was to develop plans for reestablishing native vegetation on the first category of sites, to monitor the implementation of these plans, to evaluate the effectiveness of these efforts, and to identify remediation methods where necessary. The Reclamation Support Project focused on three major areas: geologic hydrologic boreholes, the Exploratory Shaft Facility (ESF), and the Near-Surface Test Facility (NSTF). A number of BWIP reclamation sites seeded between 1989 and 1990 were found to be far below reclamation objectives. These sites were remediated in 1991 using various seedbed treatments designed to rectify problems with water-holding capacity, herbicide activity, surficial crust formation, and nutrient imbalances. Remediation was conducted during November and early December 1991. Sites were examined on a monthly basis thereafter to evaluate plant growth responses to these treatments. At all remediation sites early plant growth responses to these treatments. At all remediation sites, early plant growth far exceeded any previously obtained using other methods and seedbed treatments. Seeded plants did best where amendments consisted of soil-plus-compost or fertilizer-only. Vegetation growth on Gable Mountain was less than that found on other areas nearby, but this difference is attributed primarily to the site's altitude and north-facing orientation.

  20. Conservation Science Fair Projects.

    ERIC Educational Resources Information Center

    Soil Conservation Society of America, Ankeny, IA.

    Included are ideas, suggestions, and examples for selecting and designing conservation science projects. Over 70 possible conservation subject areas are presented with suggested projects. References are cited with each of these subject areas, and a separate list of annotated references is included. The references pertain to general subject…

  1. Project STRIDE: Welcome Revivals.

    ERIC Educational Resources Information Center

    Welch, Nancy; Sandler, Linda

    Project STRIDE was conducted at Keys Community Center in Phoenix, Arizona, to create job linkages and prepare local people for jobs in distressed areas through relationships among residents, employers, and service providers. The project's components include a community jobs team, group employability training, goal-setting, computer training, job…

  2. Plant Biology Science Projects.

    ERIC Educational Resources Information Center

    Hershey, David R.

    This book contains science projects about seed plants that deal with plant physiology, plant ecology, and plant agriculture. Each of the projects includes a step-by-step experiment followed by suggestions for further investigations. Chapters include: (1) "Bean Seed Imbibition"; (2) "Germination Percentages of Different Types of Seeds"; (3)…

  3. Spray combustion stability project

    NASA Technical Reports Server (NTRS)

    Jeng, San-Mou; Litchford, Ron J.

    1992-01-01

    This report summarizes research activity on the Spray Combustion Stability Project, characterizes accomplishments and current status, and discusses projected future work. The purpose is to provide a concise conceptual overview of the research effort to date so the reader can quickly assimilate the gist of the research results and place them within the context of their potential impact on liquid rocket engine design technology.

  4. Men's Family Learning Project.

    ERIC Educational Resources Information Center

    Bryant, Duane; Robinson, George; Taylor, Jane

    A Men's Family Learning Project was conducted in Bristol to induce men, many of whom were unemployed, to take advantage of learning opportunities and to volunteer to interact with children in the Hareclive Primary School. Following a survey of educational needs in the community, a project director (a male with experience as a volunteer and ties to…

  5. The Moon Project

    ERIC Educational Resources Information Center

    Trundle, Kathy Cabe; Willmore, Sandra; Smith, Walter S.

    2006-01-01

    What Australia, Alaska, Qatar, Indiana, and Ohio have in common is the authentic writing More Observations Of Nature (MOON) project. In this unique project, teachers from these disparate geographic locations teamed up to instruct children in grades four through eight via the internet on a nearly universally challenging subject for teachers in the…

  6. Project Week at Yeovil.

    ERIC Educational Resources Information Center

    Gadd, K. F.

    1979-01-01

    This article describes an approach to science teaching in which secondary school students and faculty members lived and worked together for a week at Yeovil College, concentrating on science project work. The projects investigated during this time are briefly described. (GA)

  7. The Baby Project

    ERIC Educational Resources Information Center

    Harden, Darby L.; Verdeyen, Tasha B.

    2007-01-01

    This article discusses a project about babies undertaken by a class of children ranging in age from 2.9 years to 3.9 years old in a small Illinois town. Throughout this project, the children studied equipment and supplies needed to care for babies. They made dolls for the classroom, constructed a cradle, made observational drawings, created topic…

  8. Family Reunification Project.

    ERIC Educational Resources Information Center

    Administration for Children, Youth, and Families (DHHS), Washington, DC.

    Utah's Department of Human Services' Family Reunification Project was initiated to demonstrate that intensive, time-limited, home-based services would enable children in foster care to return to their natural families more rapidly than regular foster care management permits. The following steps were taken in project development: (1) sites were…

  9. SDM Virtualness Project

    NASA Technical Reports Server (NTRS)

    Lim, Christopher Yit-Seong; Klein, Janice

    2004-01-01

    In the summer of 2001, NASA and Ford Motor Company co-sponsored a research project aimed at improving the education process and application of lessons learned through distant education. The System Design & Management Program (SDM) was used as a laboratory for improving distance learning capabilities. The research project was a follow up to previous research on globally dispersed teams.

  10. A Holiday Project.

    ERIC Educational Resources Information Center

    Kofod, Maudrey Taranto

    1996-01-01

    Describes a classroom project involving the construction of a holiday mobile. Necessary supplies include a lightweight hanger, construction paper, string, scissors, protractors, compasses, and rulers. Concepts involved in the construction of the project include illustrating a chord, radius, diameter, shapes, metric measuring, circumference, area,…

  11. The Home Microbiome Project

    SciTech Connect

    Gilbert, Jack

    2014-08-25

    The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

  12. The Home Microbiome Project

    ScienceCinema

    Gilbert, Jack

    2014-09-15

    The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

  13. The Plate Tectonics Project

    ERIC Educational Resources Information Center

    Hein, Annamae J.

    2011-01-01

    The Plate Tectonics Project is a multiday, inquiry-based unit that facilitates students as self-motivated learners. Reliable Web sites are offered to assist with lessons, and a summative rubric is used to facilitate the holistic nature of the project. After each topic (parts of the Earth, continental drift, etc.) is covered, the students will…

  14. Avoiding Project Creep.

    ERIC Educational Resources Information Center

    Kennerknecht, Norbert J.; Scarnati, James T.

    1998-01-01

    Discusses how to keep school district capital-improvement projects within budget. Examines areas where runaway costs creep into a project and ways of cutting or lessening these costs, such as using standard agreements, controlling architect's expense reimbursements, developing a quality-control process, and reducing document duplication. (GR)

  15. Project CAPABLE: Model Unit.

    ERIC Educational Resources Information Center

    Madawaska School District, ME.

    Project CAPABLE (Classroom Action Program: Aim: Basic Learning Effectiveness) is a classroom approach which integrates the basic learning skills with content. The goal of the project is to use basic learning skills to enhance the learning of content and at the same time use the content to teach basic learning skills. This manual illustrates how…

  16. Winnipeg Centre Project.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education, Winnipeg.

    The Winnipeg Centre Project is a field-based, work-study program that attempts to create more appropriate education for the inner-city child. Sponsored by the Planning and Research Branch of the Department of Colleges and Universities Affairs and administered by Brandon University in consultation with the Winnipeg School Division, the project is…

  17. Designing job enrichment projects.

    PubMed

    Clakeley, G L

    1988-01-01

    This paper describes a management strategy for a job satisfaction program utilized in a large occupational therapy department. The goal of the program is to retain satisfied, productive employees and reduce attrition of therapists and assistants. The use of job enrichment projects for occupational therapy assistants will be presented with brief descriptions of two projects. PMID:23944880

  18. Small Projects First

    ERIC Educational Resources Information Center

    Shang-Kuei, Chen

    1975-01-01

    For thousands of years China has been troubled by droughts and floods. In the past 25 years, the country has worked to alleviate these problems. Numerous water conservation projects requiring the communal efforts of the people have been carried out. Record grain crops have resulted from these projects. (MA)

  19. Distortion in Perspective Projection

    ERIC Educational Resources Information Center

    Kelso, Robert P., Sr.

    2008-01-01

    The paper presents a unique approach in associating perspective projection with the image beheld by the eye and demonstrates that all graphical and photographic perspective projections must contain distortion when compared to the image beheld by the eye. (Contains 8 figures.)

  20. The HALI Project

    ERIC Educational Resources Information Center

    Thompson, Brad

    2011-01-01

    This article features The HALI Project and shares experiences that led to the first part of the project--Empowered Parents. This program taught parents how to first come to grips with the reality of their situation, then dream new, appropriate dreams for their children. From there it addressed understanding the ongoing emotional journey and how it…

  1. Projecting Personnel Needs.

    ERIC Educational Resources Information Center

    Kelly, Philip T.

    Increased reliance on personnel services is placing school districts' business operations in a no-win situation. This report evaluates methods of student population projection in relation to teacher costs. Educational costs reflect personnel costs in light of a decrease in the number of pupils being served. Increased enrollment projections create…

  2. Beacon College Project Directory.

    ERIC Educational Resources Information Center

    Barnett, Lynn, Ed.

    The American Association of Community Colleges' Beacon College Project (BCP) uses funds from the Kellogg Foundation to award two-year grants to "Beacon" community colleges to form consortia with at least five associate colleges, designed to improve a specific aspect of institutional life. A total of 26 projects, many involving community…

  3. The Global Thinking Project.

    ERIC Educational Resources Information Center

    Hassard, Jack; Weisburg, Julie

    1992-01-01

    Describes the Global Thinking Project, a collaborative effort between Georgia State University and the Russian Academy of Pedagogical Sciences to develop strategies, methods, and teaching materials to help students think globally. Students are connected through the AppleLink network. Student and teacher attitudes toward the project are reported.…

  4. The TULIP Project.

    ERIC Educational Resources Information Center

    Gusack, Nancy, Ed.; And Others

    1995-01-01

    Contains 11 articles that describe different university access systems designed and built to provide access to journals via The University Licensing Program (TULIP), a science journal access project, involving Elsevier Science Publishing and major universities. The project produced insights to help with future electronic information delivery…

  5. Life Skills Project

    ERIC Educational Resources Information Center

    Jalazo, Michael D.

    2005-01-01

    In this article, the author, Program Administrator of the Pinellas County Sheriff's Office (PCSO) Project New Attitudes in Clearwater, Florida, describes the project. The PCSO is the country's largest law enforcement agency, providing law enforcement services to over 400,000 of its residents who reside in the unincorporated areas of the county and…

  6. MEXICAN MIGRATION PROJECT

    EPA Science Inventory

    The Mexican Migration Project is designed to make timely, high-quality data on documented and undocumented Mexican migrants available to researchers and policy analysts. Each year since 1987 the project has administered a semi-structured interview schedule to representative sampl...

  7. Intergenerational Projects: Idea Book.

    ERIC Educational Resources Information Center

    Clay, Rebecca; Ventura-Merkel, Cathy; Eades-Goudy, Dianne; Dubich, Teresa

    This book profiles 74 intergenerational programs in the United States. The programs range from basic tutoring projects to a sophisticated corporate-based day care center. Project selection was based on replicatable programs involving mutually beneficial exchanges. Grouped by subjects, profiles include programs targeting both young and old. Most…

  8. Mathematics Projects Handbook.

    ERIC Educational Resources Information Center

    Hess, Adrien L.

    This handbook is designed as a guide for teachers and students in choosing and developing mathematics projects, from simple demonstrations of mathematical problems or principles that the teacher has assigned as classroom learning experiences to complex, sophisticated exhibits, intended for entrance in fairs and competitions. The use of projects to…

  9. Award Winning Science Projects.

    ERIC Educational Resources Information Center

    Showalter, Victor M.; Slesnick, Irwin L.

    This is a collection of reports of student award winning science projects that have appeared in "The Science Teacher." Grade levels 7-12 are represented with projects categorized as follows: biology, chemistry and physics, earth-space science, and miscellaneous. In each section the abstracts are arranged in order of increasing complexity beginning…

  10. Science Explorers Translation Project.

    ERIC Educational Resources Information Center

    Jacobs, Dolores

    This paper describes a pilot project of Los Alamos National Laboratory (New Mexico) to translate a science education curriculum for junior and senior high school students into Navajo. The project consisted of translating a video, a teacher's guide, and an interactive multimedia product on the 1993 hantavirus outbreak in the Four Corners area…

  11. Project Planning and Reporting

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.

  12. Interactive Genetics Tutorial Project.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Dept. of Curriculum and Instruction.

    The Interactive Genetics Tutorial (IGT) project and the Intelligent Tutoring System for the IGT project named MENDEL supplement genetics instruction in biology courses by providing students with experience in designing, conducting, and evaluating genetics experiments. The MENDEL software is designed to: (1) simulate genetics experiments that…

  13. The Mars Millennium Project.

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, Washington, DC.

    The countdown to a new century provides a unique opportunity to engage America's youth in charting a course for the future. The Mars Millennium Project challenges students across the nation to design a community yet to be imagined for the planet Mars. This interdisciplinary learning project aims to encourage K-12 students in classrooms and youth…

  14. Project BEST Final Report.

    ERIC Educational Resources Information Center

    Pankratz, David; Friedenberg, Joan

    Project BEST (Building Energy Systems Technology), a bilingual vocational training program, operated at Oakton Community College between March 1986 and September 1987. The purpose of the project was to provide 60 limited English proficient (LEP) Hispanic and Polish adults with sufficient vocational skills, English language skills, and appropriate…

  15. The Paint Creek Project.

    ERIC Educational Resources Information Center

    Northrop, David; Vonck, Beth

    1998-01-01

    Describes a summer program project designed and conducted by a mixed-age group of elementary children. Students collected data to determine whether a local stream was polluted, and interpretations of the data varied. An informational video about the project and the creek was produced. (PVD)

  16. Playground Beautification Project.

    ERIC Educational Resources Information Center

    Lussiez, Yann W.

    2001-01-01

    Presents a project for high school art students called "The Playground Beautification Project" where they created: (1) "Cartoon Playground", featuring benches painted with checkerboards and decorated with cartoon and storybook characters; and (2) "Artist Garden", displaying benches painted with surrealist and post-modern art. (CMK)

  17. Prison Literacy Project Handbook.

    ERIC Educational Resources Information Center

    Kops, Joan, Ed.

    This handbook records the creation, development and growth, and stumbling blocks and successes of the Prison Literacy Project (PLP). It is intended to serve as a model for other community groups that are developing their own literacy projects. The handbook provides a history and philosophy of PLP, states PLP's vision and purpose, discusses need,…

  18. Educational Project with MIND.

    ERIC Educational Resources Information Center

    Ruddock, Helen; Worrall, Paul

    A project in creative writing and literacy was developed and implemented for people experiencing mental health difficulties. The project was a jointly organized activity between Dearne Valley College and Doncaster MIND in England. (MIND is a network of mental health associations in England and Wales.) The college counselor acted as the supervisor…

  19. Schoolyard Habitat Project Guide.

    ERIC Educational Resources Information Center

    Mason, Rich

    This project aims to provide basic steps for students to restore and create wildlife habitats on school grounds. Four chapters are included in this guide, and each chapter is divided into teacher and student sections. Chapter 1 provides necessary information for starting a habitat project. Chapters 2, 3, and 4 discuss the details for the Forest…

  20. The Physics Plus Project.

    ERIC Educational Resources Information Center

    McKim, F. R.

    1983-01-01

    The Physics Plus Project is producing a series of pamphlets designed to supplement existing curricula with physics application topics (such as physics of sports, motor cars, weather, medical physics, energy). Discusses rationale for the projects, pamphlet production, distribution to schools, and use of pamphlet material on examinations. (JM)

  1. The Ribosomal Database Project

    PubMed Central

    Olsen, Gary J.; Overbeek, Ross; Larsen, Niels; Marsh, Terry L.; McCaughey, Michael J.; Maciukenas, Michael A.; Kuan, Wen-Min; Macke, Thomas J.; Xing, Yuqing; Woese, Carl R.

    1992-01-01

    The Ribosomal Database Project (RDP) compiles ribosomal sequences and related data, and redistributes them in aligned and phylogenetically ordered form to its user community. It also offers various software packages for handling, analyzing and displaying sequences. In addition, the RDP offers (or will offer) certain analytic services. At present the project is in an intermediate stage of development. PMID:1598241

  2. Alternatives: Project Description.

    ERIC Educational Resources Information Center

    Brier, Norman

    Alternatives is a project designed for youngsters, ages 11-15, who display serious conduct problems and severe learning deficiencies. The primary goal of the project is to prevent the development of a chronic antisocial orientation among youngsters who are at high risk for such an outcome. The interventions employed at Alternatives are based on…

  3. Metadata: Projects & Standards.

    ERIC Educational Resources Information Center

    Milstead, Jessica; Feldman, Susan

    1999-01-01

    Describes efforts of three official metadata standards-setting bodies. Discusses the three categories of metadata formats; metadata registries; the Dublin Core and its relatives; several geospatial and biological metadata projects; and vocabularies/data element content. Provides a list of links to metadata projects and resources. (AEF)

  4. Fundred Dollar Bill Project

    ERIC Educational Resources Information Center

    Rubin, Mary

    2009-01-01

    This article describes the Fundred Dollar Bill Project which is an innovative artwork made of millions of drawings. This creative collective action is intended to support Operation Paydirt, an extraordinary art/science project uniting three million children with educators, scientists, healthcare professionals, designers, urban planners, engineers,…

  5. Winter Art Education Project

    ERIC Educational Resources Information Center

    Jokela, Timo

    2007-01-01

    The purpose of this article is to describe how the Department of Art Education at the University of Lapland in Finland has developed winter art as a method of environmental and community-based art education. I will focus on the Snow Show Winter Art Education Project, a training project funded by the European Union and the State Provincial Office…

  6. BI Project Success

    ERIC Educational Resources Information Center

    Tracey, Graham; Riha, James

    2009-01-01

    Managing business intelligence (BI) projects in higher education is a formidable responsibility that challenges even the most experienced technical project managers. Data source dependencies, uncertain data quality, changing information requirements, and urgency for actionable information are but a few examples among the multitude of challenges.…

  7. The Billboard Project

    ERIC Educational Resources Information Center

    Weaver, Victoria

    2005-01-01

    Since 1997, the author coordinated a large-scale billboard project. Coordinated to coincide with the National Art Education Association's celebration of Youth Art Month, strong commitments from faculty, students, administrators, public-relations liaisons, local press, radio, TV, and community businesses have made this project a success. The first…

  8. The CLASS Project.

    ERIC Educational Resources Information Center

    National Wildlife Federation, Washington, DC.

    The CLASS project is a series of investigations and projects designed by the National Wildlife Federation as supplementary materials for existing junior high school environmental curricula. This notebook contains nine different sections: an introduction, six content areas, a series of case studies, and a resource bibliography. The six content…

  9. Enrollment Projection Model.

    ERIC Educational Resources Information Center

    Gustafson, B. Kerry; Hample, Stephen R.

    General documentation for the Enrollment Projection Model used by the Maryland Council for Higher Education (MCHE) is provided. The manual is directed toward both the potential users of the model as well as others interested in enrollment projections. The first four chapters offer administrators or planners insight into the derivation of the…

  10. Project 8 Tags

    ERIC Educational Resources Information Center

    Ramos-Burrows, Michele

    2010-01-01

    In this article, the author describes 8 Tags, a project that she used with her eighth-grade studio art students to encourage them to come up with original and creative solutions to an assignment. She also wanted to incorporate their knowledge of the elements of art and principles of design. In this project, students were challenged to create an…

  11. The Comic Book Project

    ERIC Educational Resources Information Center

    Bitz, Michael

    2008-01-01

    The Comic Book Project (CBP) celebrates its eighth anniversary this year. The project, which just originated with one school in New York City, had grown to encompass thousands of students nationwide. The goal of the CBP is not to create comics the "Marvel way" or to develop the next Stan Lee. Rather, the goal is to give students the opportunity to…

  12. Project resource reallocation algorithm

    NASA Technical Reports Server (NTRS)

    Myers, J. E.

    1981-01-01

    A methodology for adjusting baseline cost estimates according to project schedule changes is described. An algorithm which performs a linear expansion or contraction of the baseline project resource distribution in proportion to the project schedule expansion or contraction is presented. Input to the algorithm consists of the deck of cards (PACE input data) prepared for the baseline project schedule as well as a specification of the nature of the baseline schedule change. Output of the algorithm is a new deck of cards with all work breakdown structure block and element of cost estimates redistributed for the new project schedule. This new deck can be processed through PACE to produce a detailed cost estimate for the new schedule.

  13. DAF Glovebox Project Plan

    SciTech Connect

    Martinez, M.W.; Higgs, R.L.

    2000-11-14

    This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

  14. North American LNG Project Sourcebook

    SciTech Connect

    2007-06-15

    The report provides a status of the development of LNG Import Terminal projects in North America, and includes 1-2 page profiles of 63 LNG projects in North America which are either in operation, under construction, or under development. For each project, the sourcebook provides information on the following elements: project description, project ownership, project status, projected operation date, storage capacity, sendout capacity, and pipeline interconnection.

  15. Energy Efficiency Project Development

    SciTech Connect

    IUEP

    2004-03-01

    The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1, 2001 through

  16. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect

    Terry W. Battiest

    2008-06-11

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  17. Hydropower major rehabilitation projects

    SciTech Connect

    Norlin, J.A.

    1995-12-31

    The Corps of Engineers has developed an active Major Rehabilitation Program to handle large, long duration restoration projects. These projects are funded by specific appropriations and subsequently are required to have detailed rehabilitation plans to justify the work. The emphasis of the Major Rehabilitation Program is correcting reliability problems. Papers that were presented at Waterpower `93 discussed the basic concepts that are required in preparing a Major Rehabilitation Evaluation Report. This paper will cover the current status of each of the current major rehabilitation projects that the Corps of Engineers has in progress.

  18. NACA documents database project

    NASA Technical Reports Server (NTRS)

    Smith, Ruth S.

    1991-01-01

    The plan to get all the National Advisory Committee on Aeronautics (NACA) collection online, with quality records, led to the NACA Documents Data base Project. The project has a two fold purpose: (1) to develop the definitive bibliography of NACA produced and/or held documents; and (2) to make that bibliography and the associated documents available to the aerospace community. This study supports the first objective by providing an analysis of the NACA collection and its bibliographic records, and supports the second objective by defining the NACA archive and recommending methodologies for meeting the project objectives.

  19. The Methanol Economy Project

    SciTech Connect

    Olah, George; Prakash, G. K.

    2014-02-01

    The Methanol Economy Project is based on the concept of replacing fossil fuels with methanol generated either from renewable resources or abundant natural (shale) gas. The full methanol cycle was investigated in this project, from production of methanol through bromination of methane, bireforming of methane to syngas, CO2 capture using supported amines, co-electrolysis of CO2 and water to formate and syngas, decomposition of formate to CO2 and H2, and use of formic acid in a direct formic acid fuel cell. Each of these projects achieved milestones and provided new insights into their respective fields.

  20. WFIRST Project Science Activities

    NASA Technical Reports Server (NTRS)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  1. LIMB demonstration project extension

    SciTech Connect

    Not Available

    1990-09-21

    The purpose of the DOE limestone injection multistage burner (LIMB) Demonstration Project Extension is to extend the data base on LIMB technology and to expand DOE's list of Clean Coal Technologies by demonstrating the Coolside process as part of the project. The main objectives of this project are: to demonstrate the general applicability of LIMB technology by testing 3 coals and 4 sorbents (total of 12 coal/sorbent combinations) at the Ohio Edison Edgewater plant; and to demonstrate that Coolside is a viable technology for improving precipitator performance and reducing sulfur dioxide emissions while acceptable operability is maintained. Progress is reported. 3 figs.

  2. One project`s waste is another project`s resource

    SciTech Connect

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  3. The human genome project

    SciTech Connect

    Bell, G.I.

    1991-06-01

    The Human Genome Project will obtain high-resolution genetic and physical maps of each human chromosome and, somewhat later, of the complete nucleotide sequence of the deoxyribonucleic acid (DNA) in a human cell. The talk will begin with an extended introduction to explain the Project to nonbiologists and to show that map construction and sequence determination require extensive computation in order to determine the correct order of the mapped entities and to provide estimates of uncertainty. Computational analysis of the sequence data will become an increasingly important part of the project, and some computational challenges are described. 5 refs.

  4. "Cheesy Pizza": The Pizza Project

    ERIC Educational Resources Information Center

    Gallick, Barbara; Lee, Lisa

    2009-01-01

    A class of 3- to 5-year-old children in a midwestern child care center chose to study pizza restaurants as a group project. This article discusses how the project evolved, describes the three phases of the project, and provides the teachers' reflections on the project. Photos taken during the project and children's sketches are included. (Contains…

  5. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  6. Air Traffic Network Project

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The high level requirement of the Air Traffic Network (ATN) project is to provide a mechanism for evaluating the impact of router scheduling modifications on a networks efficiency, without implementing the modifications in the live network.

  7. Projecting Health Needs

    NASA Technical Reports Server (NTRS)

    1976-01-01

    NASA's Jet Propulsion Laboratory has developed a computer model for planning future health care needs in the Los Angeles area. The model integrates demographic health and other data to provide rational projections of hospital bed and physician specialty requirements.

  8. Navajo Electrification Demonstraiton Project

    SciTech Connect

    Larry Ahasteen, Project Manager

    2006-07-17

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

  9. The Classroom Space Project.

    ERIC Educational Resources Information Center

    Verbickas, Sarah

    2002-01-01

    Introduces the Classroom Space project aimed at revitalizing science education at Key Stages 3 and 4 by using exciting examples from Space Science and Astronomy to illustrate key science concepts. (Author/YDS)

  10. DOE Robotics Project

    SciTech Connect

    Not Available

    1991-01-01

    This document provide the bimonthly progress reports on the Department of Energy (DOE) Robotics Project by the University of Michigan. Reports are provided for the time periods of December 90/January 91 through June 91/July 91. (FI)

  11. Lake Charles CCS Project

    SciTech Connect

    Leib, Thomas; Cole, Dan

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials

  12. Project Delivery Methods.

    ERIC Educational Resources Information Center

    Dolan, Thomas G.

    2003-01-01

    Describes project delivery methods that are replacing the traditional Design/Bid/Build linear approach to the management, design, and construction of new facilities. These variations can enhance construction management and teamwork. (SLD)

  13. Principles of project management

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  14. Vitamin D Pooling Project

    Cancer.gov

    The Vitamin D Pooling Project of Rarer Cancers brought together investigators from 10 cohorts to conduct a large prospective epidemiologic study of the association between vitamin D status and seven rarer cancers.

  15. Project financial evaluation

    SciTech Connect

    None, None

    2009-01-18

    The project financial section of the Renewable Energy Technology Characterizations describes structures and models to support the technical and economic status of emerging renewable energy options for electricity supply.

  16. An Industrial Project

    ERIC Educational Resources Information Center

    Petherbridge, R. F.; Poole, J. T.

    1974-01-01

    Discusses a two-year project on the properties of polyelectrolyte flocculants conducted by students at the Abbey High School, Redditch, England. Included are descriptions of the experimental procedures used and conclusions arrived at. (CC)

  17. Quality Assurance Project Plan

    SciTech Connect

    Holland, R. C.

    1998-06-01

    This Quality Assurance Project Plan documents the quality assurance activities for the Wastewater/Stormwater/Groundwater and Environmental Surveillance Programs. This QAPP was prepared in accordance with DOE guidance on compliance with 10CFR830.120.

  18. Desktop Computing Integration Project

    NASA Technical Reports Server (NTRS)

    Tureman, Robert L., Jr.

    1992-01-01

    The Desktop Computing Integration Project for the Human Resources Management Division (HRMD) of LaRC was designed to help division personnel use personal computing resources to perform job tasks. The three goals of the project were to involve HRMD personnel in desktop computing, link mainframe data to desktop capabilities, and to estimate training needs for the division. The project resulted in increased usage of personal computers by Awards specialists, an increased awareness of LaRC resources to help perform tasks, and personal computer output that was used in presentation of information to center personnel. In addition, the necessary skills for HRMD personal computer users were identified. The Awards Office was chosen for the project because of the consistency of their data requests and the desire of employees in that area to use the personal computer.

  19. Space Traveler Project.

    ERIC Educational Resources Information Center

    Instructor, 1981

    1981-01-01

    Describes the winners of the Space Traveler Project, a contest jointly sponsored by Rockwell International, NASA, and this magazine to identify worthwhile elementary science programs relating to the Space Shuttle. (SJL)

  20. AgrAbility Project

    MedlinePlus

    ... About AgrAbility State Projects Directory The Toolbox AT Database Resources Veterans & Beginning Farmers Communities of Interest News ... 800) 825-4264 Home About The Toolbox AT Database Resources Online Training Contact Us You are here: ...

  1. The LEGENDS Project.

    ERIC Educational Resources Information Center

    Clark, G. Christopher

    1993-01-01

    Describes the Legends Project in Indiana in which a class collaboratively researches, writes, and illustrates a local legend and sends it via computers and modems to other classes across the state. (SR)

  2. West Hackberry Tertiary Project

    SciTech Connect

    Gillham, Travis H.

    1999-01-14

    The West Hackberry Tertiary Project is a field test of the concept that air injection can be combined with the Double Displacement Process to produce a tertiary recovery process that is both low cost and economic at current oil prices.

  3. Project Playpen -- Primary Prevention

    ERIC Educational Resources Information Center

    Finck, George H.; And Others

    1972-01-01

    A pilot project of subsidized family day care, designed for low-income working mothers and aimed at fostering a child's developmental needs, turned out to be a comprehensive service that also altered attitudes of middle-class volunteers. (Editor)

  4. Student Originated Projects

    ERIC Educational Resources Information Center

    Young, L. J.; Purcupile, J. C.

    1972-01-01

    Describes an interdisciplinary research project on production of food or fodder yeast from sewage. Indicates the presence of satisfactory educational and experimental results in operation of a pilot plant. (CC)

  5. The Poisons Project.

    ERIC Educational Resources Information Center

    Crawford, Barbara A.

    1998-01-01

    Details a project in which students explore and study the poisons in their environment by asking and finding answers to their own research questions. Includes some suggestions for involving students successfully in inquiry-based learning. (DDR)

  6. Mathematics Case Methods Project.

    ERIC Educational Resources Information Center

    Barnett, Carne S.

    1998-01-01

    Presents an overview and analysis of the Mathematics Case Methods Project, which uses cases in order to examine and reflect upon teaching. Focuses on a special kind of teacher knowledge, coined pedagogical-content knowledge. (ASK)

  7. Evaluation of microfinance projects.

    PubMed

    Johnson, S

    1999-08-01

    This paper criticizes the quick system proposed by Henk Moll for evaluating microfinance projects in the article ¿How to Pre-Evaluate Credit Projects in Ten Minutes¿. The author contended that there is a need to emphasize the objectives of the project. The procedure used by Moll, he contended, is applicable only to projects that have only two key objectives, such as credit operations, and the provision of services. Arguments are presented on the three specific questions proposed by Moll, ranging from the availability of externally audited financial reports, the performance of interest rate on loans vis-a-vis the inflation rate, and the provision of loans according to the individual requirements of the borrowers. Lastly, the author emphasizes that the overall approach is not useful and suggests that careful considerations should be observed in the use or abuse of a simple scoring system or checklist such as the one proposed by Moll. PMID:12349295

  8. Robotic Lander Development Project

    NASA Video Gallery

    The Robotic Lander Development Project at the Marshall Center is testing a prototype lander that will aid in the design and development of a new generation of small, smart, versatile robotic lander...

  9. Presupposti teorici per un progetto di insegnamento della traduzione dalla lingua straniera basato sull'analisi testuale (Theoretical Presuppositions for a Project to Teach Translation from a Foreign Language Based on Textual Analysis).

    ERIC Educational Resources Information Center

    Horrakh, Livio

    1987-01-01

    Discusses an approach to translation based on textual linguistics. The student/translator first looks at the foreign language text as a whole, then analyzes its parts, and finally arrives at a new synthesis (the translation) that is comparable to the original text. (CFM)

  10. The Mississippi CCS Project

    SciTech Connect

    Doug Cathro

    2010-09-30

    The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

  11. Spray combustion stability project

    NASA Technical Reports Server (NTRS)

    Jeng, San-Mou; Litchford, Ron J.

    1990-01-01

    This report summarizes research activity on the Spray Combustion Stability Project, characterizes accomplishments and current status, and discusses projected future work. The purpose is to provide a concise conceptual overview of the research effort so the reader can quickly assimilate the gist of the research results and place them within the context of their potential impact on liquid rocket engine design technology. Therefore, this report does not elaborate on many of the detailed technical aspects of the research program.

  12. Badgers gasohol project

    SciTech Connect

    Not Available

    1981-07-29

    It is reported that Badger Energy is to participate in a gasohol project that will utilize the Tate and Lyle fermentation process at the proposed plant at Thibodaux, La., to produce 20 million gal/year of ethanol. The facility will be able to process alternative feedstocks such as grain, sorghum and sugar cane. The Dept. of Energy is funding the first phase of the project, which includes a feasibility study, by a grant of $1.9 million.

  13. COBRA Main Engine Project

    NASA Technical Reports Server (NTRS)

    Snoddy, Jim; Sides, Steve; Lyles, Garry M. (Technical Monitor)

    2002-01-01

    The COBRA (CO-Optimized Booster for Reusable Applications) project include the following: 1. COBRA main engine project team. 2. COBRA and RLX cycles selected. 3. COBRA proto-type engine approach enables mission success. 4. COBRA provides quick, low cost demo of cycle and technologies. 5. COBRA cycle I risk reduction supports. 6. Achieving engine safety. 6. RLX cycle I risk reduction supports. 7. Flight qualification. 9. Life extension engine testing.

  14. Solar education project workshop

    SciTech Connect

    Smith, J.B.

    1980-10-31

    A summary of proceedings of the Solar Education Project Workshop is presented. The workshop had as its focus the dissemination of curriculum materials developed by the Solar Energy Project of the New York State Department of Education under the sponsorship of the US Department of Energy. It includes, in addition to presentations by speakers and workshop leaders, specific comments from participants regarding materials available and energy-related activities underway in their respective states and suggested strategies from them for ongoing dissemination efforts.

  15. Student Research Projects

    NASA Technical Reports Server (NTRS)

    Yeske, Lanny A.

    1998-01-01

    Numerous FY1998 student research projects were sponsored by the Mississippi State University Center for Air Sea Technology. This technical note describes these projects which include research on: (1) Graphical User Interfaces, (2) Master Environmental Library, (3) Database Management Systems, (4) Naval Interactive Data Analysis System, (5) Relocatable Modeling Environment, (6) Tidal Models, (7) Book Inventories, (8) System Analysis, (9) World Wide Web Development, (10) Virtual Data Warehouse, (11) Enterprise Information Explorer, (12) Equipment Inventories, (13) COADS, and (14) JavaScript Technology.

  16. Black Pine Circle Project

    ScienceCinema

    Mytko, Christine

    2014-09-15

    A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

  17. Black Pine Circle Project

    SciTech Connect

    Mytko, Christine

    2014-03-31

    A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

  18. Popeye Project: ROV interface

    SciTech Connect

    Scates, C.R.; Hernandez, D.A.; Hickok, D.D.

    1996-12-31

    This paper discusses the Remote Operated Vehicle (ROV) interface with the Popeye Project Subsea System. It describes the ROV-related plans, design philosophies, intervention tasks, tooling/equipment requirements, testing activities, and offshore installation experiences. Early identification and continuous consideration of the ROV interfaces significantly improved the overall efficiency of equipment designs and offshore operations. The Popeye Project helped advance the technology and standardization of ROV interfaces for deep water subsea production systems.

  19. Project S'COOL

    NASA Technical Reports Server (NTRS)

    Green, Carolyn J.; Chambers, Lin H.

    1998-01-01

    The Students Clouds Observations On-Line or S'COOL project was piloted in 1997. It was created with the idea of using students to serve as one component of the validation for the Clouds and the Earth's Radiant Energy System (CERES) instrument which was launched with the Tropical Rainfall Measuring Mission (TRMM) in November, 1997. As part of NASA's Earth Science Enterprise CERES is interested in the role clouds play in regulating our climate. Over thirty schools became involved in the initial thrust of the project. The CERES instrument detects the location of clouds and identifies their physical properties. S'COOL students coordinate their ground truth observations with the exact overpass of the satellite at their location. Their findings regarding cloud type, height, fraction and opacity as well as surface conditions are then reported to the NASA Langley Distributed Active Archive Center (DAAC). The data is then accessible to both the CERES team for validation and to schools for educational application via the Internet. By March of 1998 ninety-three schools, in nine countries had enrolled in the S'COOL project. Joining the United States participants were from schools in Australia, Canada, France, Germany, Norway, Spain, Sweden, and Switzerland. The project is gradually becoming the global project envisioned by the project s creators. As students obtain the requested data useful for the scientists, it was hoped that students with guidance from their instructors would have opportunity and motivation to learn more about clouds and atmospheric science as well.

  20. Current projects in Fuzzy Control

    NASA Technical Reports Server (NTRS)

    Sugeno, Michio

    1990-01-01

    Viewgraphs on current projects in fuzzy control are presented. Three projects on helicopter flight control are discussed. The projects are (1) radio control by oral instructions; (2) automatic autorotation entry in engine failure; and (3) unmanned helicopter for sea rescue.

  1. Project Plan Remote Target Fabrication Refurbishment Project

    SciTech Connect

    Bell, Gary L; Taylor, Robin D

    2009-08-01

    authorization for the work was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

  2. California Hydrogen Infrastructure Project

    SciTech Connect

    Heydorn, Edward C

    2013-03-12

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations

  3. Analisi dell'Interazione Verbale Nella Discussione Matematica: Un Approccio Vygotskiano (A Verbal Analysis of Interaction in Mathematics Discussion: The Vygotskiano Approach).

    ERIC Educational Resources Information Center

    Bussi, Maria G. Bartolini; Boni, Mara

    1995-01-01

    Presents a methodology for analyzing verbal interaction in mathematical discussion which is both a product and an instrument of a research project in grades one through eight. Analyzes an example of discussion from a first-grade classroom about point of view. (Author/MKR)

  4. Japan's Sunshine Project

    NASA Astrophysics Data System (ADS)

    1992-07-01

    The 1991 results of the Sunshine Project carried out by the Japanese government's MITI is summarized. The outline of the project is given in terms of basic research and development of new energy technology, Sunshine Project promotion/support researches, and international cooperation. As for the basic R and D, research and development of ocean energy, wind energy, and bio-energy are conducted, and the analytical evaluation is made. Concerning the project promotion/support researches, the issue of introduction of new energy such as energy and environment, energy use best mix, etc. was studied. As to the international cooperation, exchanges with international organizations like IEA, participation in international joint projects, and exchange and collection of information are conducted. Details are mainly given to the studies of the ocean thermal energy conversion system, the large wind turbine power generation system, production of hydrocarbon system from CO2 fixation plant, energy conversion by microbial photosynthesis, production of new fuel oil by biotechnology, growth control compounds for biomass, etc.

  5. Radiation Embrittlement Archive Project

    SciTech Connect

    Klasky, Hilda B; Bass, Bennett Richard; Williams, Paul T; Phillips, Rick; Erickson, Marjorie A; Kirk, Mark T; Stevens, Gary L

    2013-01-01

    The Radiation Embrittlement Archive Project (REAP), which is being conducted by the Probabilistic Integrity Safety Assessment (PISA) Program at Oak Ridge National Laboratory under funding from the U.S. Nuclear Regulatory Commission s (NRC) Office of Nuclear Regulatory Research, aims to provide an archival source of information about the effect of neutron radiation on the properties of reactor pressure vessel (RPV) steels. Specifically, this project is an effort to create an Internet-accessible RPV steel embrittlement database. The project s website, https://reap.ornl.gov, provides information in two forms: (1) a document archive with surveillance capsule(s) reports and related technical reports, in PDF format, for the 104 commercial nuclear power plants (NPPs) in the United States, with similar reports from other countries; and (2) a relational database archive with detailed information extracted from the reports. The REAP project focuses on data collected from surveillance capsule programs for light-water moderated, nuclear power reactor vessels operated in the United States, including data on Charpy V-notch energy testing results, tensile properties, composition, exposure temperatures, neutron flux (rate of irradiation damage), and fluence, (Fast Neutron Fluence a cumulative measure of irradiation for E>1 MeV). Additionally, REAP contains data from surveillance programs conducted in other countries. REAP is presently being extended to focus on embrittlement data analysis, as well. This paper summarizes the current status of the REAP database and highlights opportunities to access the data and to participate in the project.

  6. National conversion pilot project

    SciTech Connect

    Floyd, D.; Nichols, F.; Lily, A.

    1994-12-31

    Manufacturing Sciences Corporation (MSC) has undertaken a project from the U.S. Department of Energy (DOE) to convert buildings that are currently contaminated at Rocky Flats into buildings that are capable of producing commercial products. This conversion project is called the National Conversion Pilot Project (NCPP). The mission of the NCPP is to explore and demonstrate at the Rocky Flats site the feasibility of economic conversion at DOE facilities. This project was officially started on April 1 with the signing of a Cooperative Assistance Agreement between MSC and the DOE. The NCPP was jointly announced by Roy Romer, Governor of the State of Colorado; Mark Silverman, Manager of the Department of Energy Rocky Flats Office; Jack McGraw, Activity Administrator for U.S. Environmental Protection Agency (EPA) Region 8; and Tom Looby, Director of the Office of Environment from the Colorado Department of Health. On March 25, 1994, Hazel O`Leary, the Secretary of the DOE, toured the site of the NCPP and heartily endorsed the project as an example of how the DOE and commercial industry can jointly accomplish the conversion and cleanup of government facilities into productive commercial ventures.

  7. Instrument validation project

    SciTech Connect

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells.

  8. Spaceborne Imaging Radar Project

    NASA Technical Reports Server (NTRS)

    Herman, Neil

    1986-01-01

    In June of 1985 the Project Initiation Agreement was signed by the Jet Propulsion Laboratory and the NASA Office of Space Science and Applications for the Spaceborne Imaging Radar Project (SIR). The thrust of the Spaceborne Imaging Radar Project is to continue the evolution of synthetic aperture radar (SAR) science and technology developed during SEASAT, SIR-A and SIR-B missions to meet the needs of the Earth Observing System (EOS) in the mid 1990's. As originally formulated, the Project plans were for a reflight of the SIR-B in 1987, the development of a new SAR, SIR-C, for missions in mid 1989 and early 1990, and the upgrade of SIR-C to EOS configuration with a qualification flight aboard the shuttle in the 1993 time frame (SIR-D). However, the loss of the shuttle Challenger has delayed the first manifest for SIR to early 1990. This delay prompted the decision to drop SIR-B reflight plans and move ahead with SIR-C to more effectively utilize this first mission opportunity. The planning for this project is discussed.

  9. 2020 Vision Project Summary

    SciTech Connect

    Gordon, K.W.; Scott, K.P.

    2000-11-01

    Since the 2020 Vision project began in 1996, students from participating schools have completed and submitted a variety of scenarios describing potential world and regional conditions in the year 2020 and their possible effect on US national security. This report summarizes the students' views and describes trends observed over the course of the 2020 Vision project's five years. It also highlights the main organizational features of the project. An analysis of thematic trends among the scenarios showed interesting shifts in students' thinking, particularly in their views of computer technology, US relations with China, and globalization. In 1996, most students perceived computer technology as highly beneficial to society, but as the year 2000 approached, this technology was viewed with fear and suspicion, even personified as a malicious, uncontrollable being. Yet, after New Year's passed with little disruption, students generally again perceived computer technology as beneficial. Also in 1996, students tended to see US relations with China as potentially positive, with economic interaction proving favorable to both countries. By 2000, this view had transformed into a perception of China emerging as the US' main rival and ''enemy'' in the global geopolitical realm. Regarding globalization, students in the first two years of the project tended to perceive world events as dependent on US action. However, by the end of the project, they saw the US as having little control over world events and therefore, we Americans would need to cooperate and compromise with other nations in order to maintain our own well-being.

  10. The Astronomy Genealogy Project

    NASA Astrophysics Data System (ADS)

    Tenn, Joseph S.

    2014-01-01

    The Astronomy Genealogy Project, to be known as AstroGen, will list as many as possible of the world's astronomers with their academic parents (aka thesis advisors) and enable the reader to trace both academic ancestors and descendants. It will be very similar to the highly successful Mathematics Genealogy Project (MGP), available at http://genealogy.math.ndsu.nodak.edu. The MGP, which has been in operation since 1996, now contains the names of about 170,000 "mathematicians." These include many physicists and astronomers, as well as practitioners of related sciences. Mitchel Keller, the director of the MGP, has generously shared the software used in that project, and the American Astronomical Society (AAS) will host AstroGen, a project of the Historical Astronomy Division, on its website. We expect to start seeking entries soon, depending on the availability of computational assistance from the AAS IT department. We are seeking volunteers to help run the project. If you are interested, please contact me at joe.tenn@sonoma.edu.

  11. The PANDA project

    NASA Astrophysics Data System (ADS)

    Katinka Petersen, Anna; Brasseur, Guy; Granier, Claire; Bouarar, Idir; Wang, Xuemei

    2014-05-01

    The PANDA project Even though air quality in many urbanized and industrialized areas of the world has improved as a result of mitigation actions, it has declined in other regions. This is specifically the case in many emerging countries where emissions have been increasing as a result of rapidly expanding motor vehicle fleets, growing industrial and power generation activities, and domestic and biomass burning. The situation is particularly acute in China and the Western Pacific Region with rapid industrialization and urbanization, where, in spite of efforts to reduce surface emissions of reactive gases, 360,000 people die prematurely from air pollution each year, according to the World Health Organization. The EU-funded PANDA project will offer scientific knowledge that will help China and other nations to use space and in-situ observations together with a modelling system to address improve air quality and human heath at the regional and global scales. Through the proposed cooperation between Europe and China, the following objectives will be reached before the completion of the Project: 1. Improvement of methods for monitoring air quality from combined space and in-situ observations 2. Elaboration of indicators for air quality, in support of European and Chinese policies 3. Development of toolboxes for air quality and emissions monitoring 4. Dissemination of information and educational activities, specifically in China. We would like to introduce the EU-funded project PANDA, and present the first results obtained through the project.

  12. The human genome project.

    PubMed Central

    Olson, M V

    1993-01-01

    The Human Genome Project in the United States is now well underway. Its programmatic direction was largely set by a National Research Council report issued in 1988. The broad framework supplied by this report has survived almost unchanged despite an upheaval in the technology of genome analysis. This upheaval has primarily affected physical and genetic mapping, the two dominant activities in the present phase of the project. Advances in mapping techniques have allowed good progress toward the specific goals of the project and are also providing strong corollary benefits throughout biomedical research. Actual DNA sequencing of the genomes of the human and model organisms is still at an early stage. There has been little progress in the intrinsic efficiency of DNA-sequence determination. However, refinements in experimental protocols, instrumentation, and project management have made it practical to acquire sequence data on an enlarged scale. It is also increasingly apparent that DNA-sequence data provide a potent means of relating knowledge gained from the study of model organisms to human biology. There is as yet little indication that the infusion of technology from outside biology into the Human Genome Project has been effectively stimulated. Opportunities in this area remain large, posing substantial technical and policy challenges. PMID:8506271

  13. The Rural Outreach Project

    NASA Technical Reports Server (NTRS)

    Coleman, Clarence D.

    2000-01-01

    The Rural Outreach Project was designed to increase the diversity of NASA's workforce by: 1) Conducting educational research designed to investigate the most effective strategies for expanding innovative, NASA-sponsored pre-college programs into rural areas; 2) Field-testing identified rural intervention strategies; 3) Implementing expanded NASA educational programs to include 300 rural students who are disabled, female and/or minority; and 4) Disseminating project strategies. The Project was a partnership that included NASA Langley Research Center's Office of Education, Norfolk State University, Cooperative Hampton Roads Organizations for Minorities in Engineering (CHROME) and Paul D. Camp Community College. There were four goals and activities identified for this project; 1) Ascertain effective strategies for expanding successful NASA-sponsored urban-based, pre-college programs into rural settings; 2) Field test identified rural intervention strategies; 3) Publish or disseminate two reports, concerning project research and activities at a national conference; 4) Provide educational outreach to 300, previously underserved, rural students who are disabled, female and /or minority.

  14. The Eclipse Project

    NASA Technical Reports Server (NTRS)

    Tucker, Tom; Launius, Roger (Technical Monitor)

    2000-01-01

    The Eclipse Project by Tom Tucker provides a readable narrative and a number of documents that record an important flight research effort at NASA's Dryden Flight Research Center. Carried out by Kelly Space and Technology, Inc., in partnership with the Air Force and Dryden at Edwards Air Force Base in the Mojave Desert of California, this project tested and gathered data about a potential newer and less expensive way to launch satellites into space. Whether the new technology comes into actual use will depend on funding, market forces, and other factors at least partly beyond the control of the participants in the project. This is a familiar situation in the history of flight research.

  15. Sun light European Project

    NASA Astrophysics Data System (ADS)

    Soubielle, Marie-Laure

    2015-04-01

    2015 has been declared the year of light. Sunlight plays a major role in the world. From the sunbeams that heat our planet and feed our plants to the optical analysis of the sun or the modern use of sun particles in technologies, sunlight is everywhere and it is vital. This project aims to understand better the light of the Sun in a variety of fields. The experiments are carried out by students aged 15 to 20 in order to share their discoveries with Italian students from primary and secondary schools. The experiments will also be presented to a group of Danish students visiting our school in January. All experiments are carried out in English and involve teams of teachers. This project is 3 folds: part 1: Biological project = what are the mechanisms of photosynthesis? part 2: Optical project= what are the components of sunlight and how to use it? part 3: Technical project= how to use the energy of sunlight for modern devices? Photosynthesis project Biology and English Context:Photosynthesis is a process used by plants and other organisms to convert light energy, normally from the Sun, into chemical energy that can later fuel the organisms' activities. This chemical energy is stored in molecules which are synthesized from carbon dioxide and water. In most cases, oxygen is released as a waste product. Most plants perform photosynthesis. Photosynthesis maintains atmospheric oxygen levels and supplies all of the organic compounds and most of the energy necessary for life on Earth. Outcome: Our project consists in understanding the various steps of photosynthesis. Students will shoot a DVD of the experiments presenting the equipments required, the steps of the experiments and the results they have obtained for a better understanding of photosynthesis Digital pen project Electricity, Optics and English Context: Sunlight is a complex source of light based on white light that can be decomposed to explain light radiations or colours. This light is a precious source to create

  16. Breckinridge Project, initial effort

    SciTech Connect

    None, None

    1982-09-01

    Report III, Volume 1 contains those specifications numbered A through J, as follows: General Specifications (A); Specifications for Pressure Vessels (C); Specifications for Tanks (D); Specifications for Exchangers (E); Specifications for Fired Heaters (F); Specifications for Pumps and Drivers (G); and Specifications for Instrumentation (J). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project, and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available to the Initial Effort (Phase Zero) work performed by all contractors and subcontractors. Report III, Volume 1 also contains the unique specifications prepared for Plants 8, 15, and 27. These specifications will be substantially reviewed during Phase I of the project, and modified as necessary for use during the engineering, procurement, and construction of this project.

  17. Project ACHIEVE final report

    SciTech Connect

    1997-06-13

    Project ACHIEVE was a math/science academic enhancement program aimed at first year high school Hispanic American students. Four high schools -- two in El Paso, Texas and two in Bakersfield, California -- participated in this Department of Energy-funded program during the spring and summer of 1996. Over 50 students, many of whom felt they were facing a nightmare future, were given the opportunity to work closely with personal computers and software, sophisticated calculators, and computer-based laboratories -- an experience which their regular academic curriculum did not provide. Math and science projects, exercises, and experiments were completed that emphasized independent and creative applications of scientific and mathematical theories to real world problems. The most important outcome was the exposure Project ACHIEVE provided to students concerning the college and technical-field career possibilities available to them.

  18. NAESA Augmentation Pilot Project

    NASA Technical Reports Server (NTRS)

    Hoover, John J.

    1998-01-01

    This project was one project within the Native American Earth and Space Academy (NAESA). NAESA is a national initiative comprised of several organizations that support programs which focus on 1) enhancing the technological, scientific and pedagogical skills of K-14 teachers who instruct Native Americans, 2) enhancing the understanding and applications of science, technology, and engineering of college-bound Native Americans and teaching them general college "survival skills" (e.g., test taking, time management, study habits), 3) enhancing the scientific and pedagogical skills of the faculty of tribally-controllcd colleges and community colleges with large Native American enrollments, and 4) strengthening the critical relationships between students, their parents, tribal elders, and their communities. This Augmentation Pilot Project focused on the areas of community-school alliances and intemet technology use in teaching and learning and daily living addressing five major objectives.

  19. Enhanced project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  20. The Timbuktu Astronomy Project

    NASA Astrophysics Data System (ADS)

    Medupe, Rodney Thebe; Warner, Brian; Jeppie, Shamil; Sanogo, Salikou; Maiga, Mohammed; Maiga, Ahmed; Dembele, Mamadou; Diakite, Drissa; Tembely, Laya; Kanoute, Mamadou; Traore, Sibiri; Sodio, Bernard; Hawkes, Sharron

    The ancient city of Timbuktu was the main centre for commerce and scholarship in West Africa from the 13th century until the 17th century. Books were bought from North Africa and other centres of Islamic learning, and local scholars also wrote many books on astronomy, medicine, mathematics, literature, law and islam. Scholarship peaked during the 16th and 17th century but declined gradually until the 19th century. Our project aims to study the ancient manuscripts from Timbuktu in order to search for astronomy in them. The main aim of the project is to document our research and use it to attract African youth into science and technology by appealing to their heritage. This paper outlines progress made since the inception of the project in 2006.

  1. Brazilian Eratosthenes Project

    NASA Astrophysics Data System (ADS)

    Langhi, R.; Vilaça, J.

    2014-10-01

    The objective of Brazilian Eratosthenes Project is the development and application of teaching training actions according the ``docent autonomy" concept to basic Astronomy Education. Argentina coordinates the project in South America, but Brazil works in this project since 2010 with the theme ``Projeto Eratóstenes Brasil" in the homepage: http://sites.google.com/site/projetoerato. Two schools measure a sticks shadow and communicate their results. After, they calculate an average radius of Earth. The stick (gnomon) should stay in vertical position in the leveled ground. Since 2010, the project received hundreds of Brazilian schools with different experiments that were constructed with autonomy, because our site doesn't show some itinerary pre-ready to elaborate the experiments. To collect data for our research, we will use interviews via Skype with the teachers. These data are useful to researches about Science Education area and the Teaching Formation. Teaching professional practice could change and we see modifications in the teachers work, what depends of their realities and context. This project intents to respect the docent autonomy. This autonomy to responsible modifications during continued formation is called ``activist formative model" according Langhi & Nardi (Educação em Astronomia: repensando a formação de professores. São Paulo: Escrituras Editora, 2012). This project discusses about researches in Astronomy Education - still extreme rare in Brazil, when we compare with other areas in Science Education. We believe that actions like this could motivate the students to learn more Astronomy. Furthermore, this national action can be a rich source of data to investigations about teaching formation and scientific divulgation.

  2. Student's Microsatellite Project

    NASA Astrophysics Data System (ADS)

    Zelentsov, Victor; Kopik, Anatoliy; Karpenko, Stanislav; Mayorova, Victoria

    2002-01-01

    Nowadays BMSTU Youth space center carries on development of the microsatellite project. The project is based on principles of students direct involvement on all stages of development and maintenance of the satellite. The group of students was organized within the university with purpose of coordination of work at the program. Project current condition The work on creation of an experimental model of the micro satellite is performed. The aim is to define the structure and parameters of on-board devices (mass-overall dimensions characteristics, energy consumption and so on). developed. According to the simplified model an active stabilization system (three orthogonal electro-magnetic coils) and orientation characterization system (sunlight detector and magnitometer) are included in OCS structure. most suitable battery storage, power-supply controlling system. Student micro-satellite program goals 1.Scientific Information gaining in the field of Earth study- using perspective research methods. Studying of new devices behavior in space conditions. 2. Educative a. Students derive real experience of projecting, building of a spacecraft from the point of view of an experimenter, a constructor and a researcher. b. Organization of student's cooperation with key men of aerospace industry and other branches. c. Brainpower and material base preparation for micro-satellite systems' development. d. Attraction of youth interest to the topic, by: - Students' and pupils' groups attraction and involvement in experiments conduction and results processing. - Seminars and lections devoted to Earth study from the space organization - Specific scientific data distribution over World Wide Web. 3. International With purpose of program expansion, the developers' group looks to start of an international project. Within the project new experiments conduction and scientific information exchange are expected. 4. Status Bauman Moscow State Technical University's status improvement in the field

  3. Human Genome Project

    SciTech Connect

    Block, S.; Cornwall, J.; Dally, W.; Dyson, F.; Fortson, N.; Joyce, G.; Kimble, H. J.; Lewis, N.; Max, C.; Prince, T.; Schwitters, R.; Weinberger, P.; Woodin, W. H.

    1998-01-04

    The study reviews Department of Energy supported aspects of the United States Human Genome Project, the joint National Institutes of Health/Department of Energy program to characterize all human genetic material, to discover the set of human genes, and to render them accessible for further biological study. The study concentrates on issues of technology, quality assurance/control, and informatics relevant to current effort on the genome project and needs beyond it. Recommendations are presented on areas of the genome program that are of particular interest to and supported by the Department of Energy.

  4. On projective coordinate spaces

    NASA Astrophysics Data System (ADS)

    Ćiftçi, Süleyman; Erdoǧan, Fatma Özen

    2015-09-01

    In the present study, an (n+1)-dimensional module over the local ring K = Mmm(ℝ) is constructed. Further, an n- dimensional projective coordinate space over this module is constructed by the help of equivalence classes. The points and lines of this space are determined and the points are classified. Finally, for a 3-dimensional projective coordinate space, the incidence matrix for a line that goes through the given points and also all points of a line given with the incidence matrix are found by the use of Maple commands.

  5. CONNECTICUT BIOFUELS TECHNOLOGY PROJECT

    SciTech Connect

    BARTONE, ERIK

    2010-09-28

    DBS Energy Inc. (“DBS”) intends on using the Connecticut Biofuels Technology Project for the purpose of developing a small-scale electric generating systems that are located on a distributed basis and utilize biodiesel as its principle fuel source. This project will include research and analysis on the quality and applied use of biodiesel for use in electricity production, 2) develop dispatch center for testing and analysis of the reliability of dispatching remote generators operating on a blend of biodiesel and traditional fossil fuels, and 3) analysis and engineering research on fuel storage options for biodiesel of fuels for electric generation.

  6. Solar Dish Project

    SciTech Connect

    Robert F. Boehm

    2004-06-06

    (Original wording, now somewhat outdated.) The Nevada Solar Dish Project is designed to deploy at least 1 MW of dish-based, field validation power generation systems in a mini-power plant near Las Vegas, Nevada, as a transitional precursor to the full commercialization of the technology. This will occur over a period of about three years, from 2001 through 2004. The statement of work defines activities that the University of Nevada Las Vegas (UNLV) will provide by establishing a test site for two dish/Stirling systems on the UNLV campus and providing operation, test and training, and education in support of the project.

  7. Biofuels: Project summaries

    SciTech Connect

    Not Available

    1994-07-01

    The US DOE, through the Biofuels Systems Division (BSD) is addressing the issues surrounding US vulnerability to petroleum supply. The BSD goal is to develop technologies that are competitive with fossil fuels, in both cost and environmental performance, by the end of the decade. This document contains summaries of ongoing research sponsored by the DOE BSD. A summary sheet is presented for each project funded or in existence during FY 1993. Each summary sheet contains and account of project funding, objectives, accomplishments and current status, and significant publications.

  8. Project Summary Report

    NASA Technical Reports Server (NTRS)

    Upchurch, Christopher

    2011-01-01

    The project, being the development of resource management applications, consisted entirely of my own effort. From deliverable requirements provided by my mentor, and some functional requirement additions generated through design reviews, It was my responsibility to implement the requested features as well as possible, given the resources available. For the most part development work consisted of database programming and functional testing using real resource data. Additional projects I worked on included some firing room console training, configuring the new NE-A microcontroller development lab network, mentoring high school CubeSat students, and managing the NE interns' component of the mentor appreciation ceremony.

  9. The project Scotia competition

    NASA Astrophysics Data System (ADS)

    Ellington, H. I.; Addinall, E.; Hately, M. C.

    1980-07-01

    In Project Scotia, competing schools had to design a UHF television broadcasting network for the hypothetical Scotia region, supposedly located somewhere on the west coast of Scotland. They then had to prepare a written 'consultants' report' describing and justifying their proposed scheme, and also produce a presentation of the scheme using models, drawings and similar techniques. The project was designed to foster effective interdepartmental and cross disciplinary cooperation. It required the pupils to carry out detailed calculations of a highly technical nature, and also to take full account of all relevant economic, geographical, social and environmental factors.

  10. Genomic standards consortium projects.

    PubMed

    Field, Dawn; Sterk, Peter; Kottmann, Renzo; De Smet, J Wim; Amaral-Zettler, Linda; Cochrane, Guy; Cole, James R; Davies, Neil; Dawyndt, Peter; Garrity, George M; Gilbert, Jack A; Glöckner, Frank Oliver; Hirschman, Lynette; Klenk, Hans-Peter; Knight, Rob; Kyrpides, Nikos; Meyer, Folker; Karsch-Mizrachi, Ilene; Morrison, Norman; Robbins, Robert; San Gil, Inigo; Sansone, Susanna; Schriml, Lynn; Tatusova, Tatiana; Ussery, Dave; Yilmaz, Pelin; White, Owen; Wooley, John; Caporaso, Gregory

    2014-06-15

    The Genomic Standards Consortium (GSC) is an open-membership community that was founded in 2005 to work towards the development, implementation and harmonization of standards in the field of genomics. Starting with the defined task of establishing a minimal set of descriptions the GSC has evolved into an active standards-setting body that currently has 18 ongoing projects, with additional projects regularly proposed from within and outside the GSC. Here we describe our recently enacted policy for proposing new activities that are intended to be taken on by the GSC, along with the template for proposing such new activities. PMID:25197446

  11. Managemant of NASA's major projects

    NASA Technical Reports Server (NTRS)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  12. Mirror Confinement Systems: project summaries

    SciTech Connect

    Not Available

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided.

  13. The Pumpkin Project

    ERIC Educational Resources Information Center

    Hardman, Bonnie

    2005-01-01

    Ms. Hardman's group of special education students were supposed to be "difficult." But their engagement in a novel interdisciplinary project had a transformative effect -- on them, on their teachers, and even on individuals far beyond their school. This article describes children and their experiences in a special education class and how they…

  14. Photographic Projects and Processes.

    ERIC Educational Resources Information Center

    King, James M.

    This highly illustrated monograph includes 22 projects developed by students in a basic photography course that can be inexpensively reproduced by students or by anyone interested in photography. Instructions are provided for making 14 photographic accessories, including a film washer, drying cabinet, camera copy stand, and bounce flash diffuser.…

  15. Vicmico algogas '80 project

    SciTech Connect

    De Luzuriaga, E.R.

    1980-12-01

    The conversion of the Victorias Milling Co. distillery into an anhydrous alcohol distillery as part of the Alcogas '80 Project is reported. The company received a loan of 7.5 million for the purchase of molasses and for the production of anhydrous alcohol which will be sold to PNOC for blending with gasoline for alcogas fuel.

  16. The Quiet Skies Project

    ERIC Educational Resources Information Center

    Rapp, Steve

    2008-01-01

    To help promote student awareness of the connection between radio astronomy and radio frequency interference (RFI), an inquiry-based science curriculum was developed to allow high school students to determine RFI levels in their communities. The Quiet Skies Project--the result of a collaboration between the National Aeronautics and Space…

  17. The Minnesota Projects

    SciTech Connect

    Gipe, P.

    1995-10-01

    In June 1995, Northern States Power (NSP), Minnesota`s largest investor-owned utility, took the wind industry by surprise when it awarded a 100-MW contract worth at least $75 million to California wind company Zond Systems. What was surprising was the bid to use 143 of Zond`s Z46 - a turbine not yet in production. The project would be the world`s largest single wind plant. Despite the award and the boost to the windpower industry, there is some controversy surrounding the Zzzzzond/NSP project. One of Zond`s competitors, Kenetech Windpower, has requested a declaratory judgement from the Minnesota Public Utility Commission voiding the NSP award to Zond. Kenetech charged that Zond`s proposed Z46 does not exist, that there is no performance data on such a turbine, and that Zond is not capable of financing such a project. NSP is under pressure to have the Zond project completed. Under an agreement hammered out by Minnesota`s state legislature, NSP is permitted to continue storing wastes from its Prarie Island nuclear plant as long as it develops wind energy according to a 100 MW incremental schedule.

  18. The Human Toxome Project

    EPA Science Inventory

    The Human Toxome project, funded as an NIH Transformative Research grant 2011--‐ 2016, is focused on developing the concepts and the means for deducing, validating, and sharing molecular Pathways of Toxicity (PoT). Using the test case of estrogenic endocrine disruption, the respo...

  19. Project ACORDE. Final Report.

    ERIC Educational Resources Information Center

    Kelley, Marjorie L.

    A report is presented on the evaluation and redevelopment of an 11-module course of instruction in restorative dentistry conducted under Project Acorde. The major learning goals for students were: acquisition of the necessary skills and knowledge of appropriate tools and materials; and self-appraisal of one's own work in performing the various…

  20. No Easy Project

    ERIC Educational Resources Information Center

    Keller, Bess

    2007-01-01

    Feeling stifled at his old school, Timothy S. Cagwin, a 39-year-old English teacher, was particularly attracted to a new schools' plans to focus on "project-based learning," a pedagogical approach high on the list of high-school-reform ideas championed by the Bill & Melinda Gates Foundation and other like-minded philanthropies, academics, and…

  1. Planning for Project Continuation.

    ERIC Educational Resources Information Center

    Berry, Grant, Jr.

    Designed to help colleges plan for the successful continuation of educational improvement projects beyond the end of their original funding period, this report presents a case study of Pennsylvania College of Technology's (PCT's) efforts to ensure the continuation of a Title III faculty development program. After describing the the Title III…

  2. Project Adobe. Final Report.

    ERIC Educational Resources Information Center

    Van Curen, Sallie A.

    This final report describes activities and accomplishments of Project Adobe, the New Mexico Parent Training and Information Center, which provides information, support, education and training to families with school-aged children with disabilities in their local communities. Achievements include: (1) completion and printing of a booklet on the…

  3. Russian Language Analysis Project

    ERIC Educational Resources Information Center

    Serianni, Barbara; Rethwisch, Carolyn

    2011-01-01

    This paper is the result of a language analysis research project focused on the Russian Language. The study included a diverse literature review that included published materials as well as online sources in addition to an interview with a native Russian speaker residing in the United States. Areas of study include the origin and history of the…

  4. Stock Market Project.

    ERIC Educational Resources Information Center

    Distel, Brenda D.

    This project is designed to teach students the process of buying stocks and to tracking their investments over the course of a semester. The goals of the course are to teach students about the relationships between conditions in the economy and the stock market; to predict the effect of an economic event on a specific stock or industry; to relate…

  5. Substance Use Prevention Project.

    ERIC Educational Resources Information Center

    Simmons, Judy

    This report outlines the Hillsborough County, Florida, Head Start Program's project to field test with young children and their families curricula that were designed to prevent alcohol and other drug problems. A national search conducted by means of computers, individual contacts, and other methods yielded information on 22 substance abuse…

  6. ALASKA VILLAGE DEMONSTRATION PROJECTS

    EPA Science Inventory

    Two demonstration projects were built as authorized by Section 113 of PL 92-500. Modular construction was used to provide central utility systems which included water supply, laundry, bathing, saunas, and wastewater treatment. Service to homes was by vehicular delivery. Fire dest...

  7. Cooperative Market Research Project.

    ERIC Educational Resources Information Center

    Carels, Peter; McCullough, Lynette

    A pilot project was developed in which the Advertising and Market Research Center of the Vienna School of Economics and Business in Austria and the German Department as well as the Marketing Department of Miami University in Ohio are working together to collect market research data and formulate a market entry strategy for Roemerquelle, an…

  8. Project-Based Science

    ERIC Educational Resources Information Center

    Krajcik, Joe

    2015-01-01

    Project-based science is an exciting way to teach science that aligns with the "Next Generation Science Standards" ("NGSS"). By focusing on core ideas along with practices and crosscutting concepts, classrooms become learning environments where teachers and students engage in science by designing and carrying out…

  9. The Student Assessment Project.

    ERIC Educational Resources Information Center

    Baumgart, Neil

    1984-01-01

    A set of instructional materials aimed at the inservice education of teachers on the topic of student assessment was developed. The Student Assessment Project comprises seven modules in slide-tape format covering the topics of test design, item writing, analysis of norm-referenced and criterion-referenced tests, etc. (Author/MLW)

  10. Spanish Literacy Investigation Project.

    ERIC Educational Resources Information Center

    Cook, Jacqueline; Quinones, Anisia

    The Spanish Literacy Investigation Project was implemented to identify adult Spanish literacy programs throughout the country, to explore the availability of relevant Spanish literacy teaching methods, to determine relevant elements between Spanish literacy and English as a Second Language (ESL), and to describe a model for incorporating a Spanish…

  11. Meteorology: Project Earth Science.

    ERIC Educational Resources Information Center

    Smith, P. Sean; Ford, Brent A.

    This document on meteorology is one of a four-volume series of Project Earth Science that includes exemplary hands-on science and reading materials for use in the classroom. This book is divided into three sections: activities, readings, and appendix. The activities are constructed around three basic concept divisions. First, students investigate…

  12. Life Skills Project

    ERIC Educational Resources Information Center

    Schwartz, Sunny

    2005-01-01

    In this article, the author describes the San Francisco Sheriff's Department (SFSD) Life Skills for Prisoners Program. The program was designed to enhance and expand the Resolve to Stop the Violence Project, which had operated successfully for three years in the San Francisco County Jail as a restorative justice program. The mission of SFSD is to…

  13. Language Arts Project.

    ERIC Educational Resources Information Center

    New Mexico Western States Small Schools Project, Santa Fe.

    The 1963 language arts project in Wagon Mound, New Mexico, was designed to make administrators and teachers aware of and concerned about the problems of teaching English to Spanish-speaking children in grades 1-12. General and specific objectives and instructional techniques stressed improvement of oral and written communication. An analysis of…

  14. The Take Action Project

    ERIC Educational Resources Information Center

    Boudreau, Sue

    2010-01-01

    The Take Action Project (TAP) was created to help middle school students take informed and effective action on science-related issues. The seven steps of TAP ask students to (1) choose a science-related problem of interest to them, (2) research their problem, (3) select an action to take on the problem, (4) plan that action, (5) take action, (6)…

  15. Campus Energy Management Projects.

    ERIC Educational Resources Information Center

    Welzenbach, Lanora, Ed.

    This publication is a compilation of data concerning energy conservation measures at more than 60 colleges and universities in the United States and Canada. The data are presented for the information of all who are interested in the variety of ways in which institutions of higher education are managing energy. Project descriptions are divided into…

  16. The Puente Project.

    ERIC Educational Resources Information Center

    Meznek, James; And Others

    The Puente Project is a statewide program that helps Mexican American/Latino community college students in California achieve their academic goals. Puente's goals are to reduce the number of Mexican American/Latino community college students who drop out of school and increase the number who transfer to four-year institutions. To meet these goals,…

  17. These Projects are WINNERS!

    ERIC Educational Resources Information Center

    Levi, Tricia

    1995-01-01

    Describes the winners of the Prentice Hall/National Middle School Association Teaching Team Awards (established to recognize exceptional interdisciplinary projects by middle school teaching teams). Students designed a new school, simulated a journey over the Oregon trail, conducted oral histories, and turned a local river into a learning…

  18. The Internet Scout Project.

    ERIC Educational Resources Information Center

    Calcari, Susan

    1997-01-01

    Describes the Internet Scout Project which provides Internet users, particularly those in higher education, with current, selective, and well-annotated pointers to information about resources, network tools, and Internet news items. Offered through regular e-mail updates, titles include The Scout Report, The Scout Report Signpost, Net-Happenings,…

  19. The History Computerization Project.

    ERIC Educational Resources Information Center

    Clark, David L.

    1992-01-01

    Description of the History Computerization Project, which is being developed for the exchange of information between researchers, librarians, archivists, museum curators, preservation groups, and historical societies, focuses on workshops that teach the use of computer database management for historical cataloging and research. (LRW)

  20. Urban Indian Project.

    ERIC Educational Resources Information Center

    Greymountain, Gus; And Others

    The second of a 2 phase study, this project provided information for the non-Indian population about problems and needs of urban American Indians. Phase I (1971) discussed urban Indian experiences and trends; compared differences and highlighted issues of Indian urbanization. Phase II focused entirely on the urban Indian community. The thrust was…

  1. Projecting California's Fiscal Future.

    ERIC Educational Resources Information Center

    Carroll, Stephen; And Others

    This paper presents findings of a study that analyzed the trends that will shape the California budget over the next decade. The study assumed that current demographic and economic trends, tax policies, and mandated spending programs will continue through the next decade, and projects their implications for state general-fund revenues and spending…

  2. Project Self: Beyond Resilience.

    ERIC Educational Resources Information Center

    Hampson, June E.; Rahman, Muhammad A.; Brown, Bobbi, Jr.; Taylor, Maryellen E.; Donaldson, Carl J., Jr.

    1998-01-01

    Describes the implementation and results of Project Self, an African-American cultural identity program, in three classes of fourth graders in the Jersey City public schools. The curriculum covers cultural inheritance, interrelations among social structures (education, politics, law, religion, economics) of a culture, and problem solving for self,…

  3. Polar processing project

    NASA Astrophysics Data System (ADS)

    Tom, C. N.; Davies, W. J.; Goycochea, J. F.

    1993-09-01

    The purpose of this project was to explore the use of polar processing techniques in SIGINT-related signal processing applications. An investigation of ways to apply the CORDIC arithmetic algorithm to signal processing problems, and an application of the TMC2330 Coordinate Transformer chip in a coprocessor or accelerator board for a Sun workstation are covered.

  4. The Castle Project

    SciTech Connect

    Tom Anderson; David Culler; James Demmel; Jerry Feldman; Susan Graham; Paul Hilfinger; Katherine Yelick

    2000-02-16

    The goal of the Castle project was to provide a parallel programming environment that enables the construction of high performance applications that run portably across many platforms. The authors approach was to design and implement a multilayered architecture, with higher levels building on lower ones to ensure portability, but with care taken not to introduce abstractions that sacrifice performance.

  5. The Child Development Project.

    ERIC Educational Resources Information Center

    Developmental Studies Center, San Ramon, CA.

    In the context of a regular academic program, the Child Development Project (CDP) helps teachers and parents promote characteristics such as helpfulness and responsibility in children in kindergarten through sixth grade. The CDP program contains five major elements: (1) cooperative activities; (2) helping activities; (3) the highlighting of…

  6. West Hackberry Tertiary Project

    SciTech Connect

    Gillham, Travis; Yannimaras, Demetrios

    1999-11-03

    The West Hackberry Tertiary Project is a field test of the concept that air injection can generate tertiary oil recovery through the Double Displacement Process. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. In Gulf Coast oil reservoirs with pronounced bed dip, reservoir performance has shown that gravity drainage recoveries average 80% to 90% of the original oil in place while water drive recoveries average 50% to 60% of the original oil in place. The target for tertiary oil recovery with the Double Displacement Process is the incremental oil between the 50% to 60% water drive recoveries and the 80% to 90% gravity drainage recoveries. The use of air injection in this process combines the benefits of air's low cost and universal accessibility with the potential for improved oil recovery resulting from spontaneous in situ combustion. If successful, this project will demonstrate that utilizing air injection in the Double Displacement Process will result in an economically viable tertiary process in many Gulf Coast oil reservoirs where other tertiary processes are presently uneconomic. The West Hackberry Tertiary Project receives matching funds from the United States Department of Energy (DOE) as part of the DOE's Class 1 Program for the development of advance recovery technologies in fluvial dominated deltaic reservoirs. In addition, the Petroleum Engineering Department at Louisiana State University (LSU) provides independent study and technology transfer.

  7. Transnational Spanish Language Project.

    ERIC Educational Resources Information Center

    Gavillan, Eva; And Others

    The Transnational Spanish Language Project curriculum is a set of instructional materials designed to enhance intercultural business communication between North American and Spanish American cultures. The curriculum covers three areas: office procedures; banking; and import/export business. Lessons, all in Spanish, are intended for…

  8. The Values Manifesto Project

    ERIC Educational Resources Information Center

    Euvrard, George

    2006-01-01

    South Africa and Namibia, two countries building young democracies, face the task of transforming their public education systems to support the values articulated in their new constitutions. This article describes a project designed to incorporate these values into schools. A group of 50 Namibian teachers, who were enrolled in the author's…

  9. SOIL BIOVENTING DEMONSTRATION PROJECT

    EPA Science Inventory

    A pilot scale demonstration project of a soil bioventing system, which utilizes the biodegradation in soil and physical removal of VOC by induced air flow, is in operation at the U.S. Coast Guard Aviation Field in Traverse City, Michigan. he system is being tested to determine it...

  10. Project Echo Task Group

    NASA Technical Reports Server (NTRS)

    1964-01-01

    'A technician assigned to the Project Echo Task Group separates the two hemispheres of the Echo 1 container for inspection. The charge that freed the balloon was placed inside of a ring encircling the canister at its equator.' Published in James R. Hansen, Spaceflight Revolution: NASA Langley Research Center From Sputnik to Apollo, NASA SP-4308, p. 181.

  11. Healy clean coal project

    SciTech Connect

    Not Available

    1992-03-01

    The objective of the Healy Clean Coal Project is to demonstrate the integration of an advanced combustor and a heat recovery system with both high and low temperature emission control processes. Resulting emission levels of SO{sub 2}, NO{sub x}, and particulates are expected to be significantly better than the federal New Source Performance Standards. (VC)

  12. Healy clean coal project

    SciTech Connect

    Not Available

    1992-05-01

    The objective of the Healy Clean Coal Project is to demonstrate the integration of an advanced combustor and heat recovery system with both high and low temperature emission control processes. The emission levels of SO{sub 2}, NO{sub x}, and particulates are expected to be significantly better then the federal New Source Performance Standards. (VC)

  13. The Lighthouse Project.

    ERIC Educational Resources Information Center

    LeRose, Barbara; And Others

    1979-01-01

    The project is based on a general systems approach. Developmental stage theory is employed as a starting point, and the developmental "minitasks" which act as stair risers from one developmental level to another are carried through with the use of Bloom's cognitive taxonomy. (Author/DLS)

  14. Eagle Writing Project.

    ERIC Educational Resources Information Center

    Davis, Thomas

    1995-01-01

    Describes a Wyoming junior high school teacher's expansion of a library research assignment to an Eagle Writing Project stressing practical skills applications, including critical thinking, listening, note taking, reviewing, respecting different opinions, communicating with government officials, writing as a practical tool, and respecting the…

  15. Manufacturing Education Curriculum Project.

    ERIC Educational Resources Information Center

    Umstattd, William D.

    The Manufacturing Education Curriculum Project's feasibility study concerned with industrial arts curriculum development in manufacturing for the senior high school level is described. The need for an industrial arts curriculum which meets and reflects present and future trends is discussed in the introduction, followed by a review of the…

  16. A Semester Ecology Project

    ERIC Educational Resources Information Center

    Baskett, Russell C.

    1969-01-01

    Describes a semester-long study of microorganisms in an aquarium as performed by a beginning microbiology class. Gives results and conclusions drawn by students utilizing many ecological principles to interpret the results. Similar projects could be used from beginning high school through advanced college biology. (EB)

  17. Alum Rock Voucher Project

    ERIC Educational Resources Information Center

    Warren, Jim

    1976-01-01

    Notes that thus far surveys show that the children like the project, the parents like it and the teachers love it. Even the National Institute of Education likes it. Yet it is the only one of its kind in the country and seems likely to remain so for the foreseeable future. (Author/AM)

  18. Meteor Beliefs Project: Introduction

    NASA Astrophysics Data System (ADS)

    McBeath, A.; Gheorghe, A. D.

    2003-05-01

    A new project to investigate beliefs in meteors and meteoric phenomena in past and present times using chiefly folklore, mythology, prose and poetic literature, is described. Some initial examples are given, along with a bibliography of relevant items already in print in IMO publications.

  19. Baltimore applications project

    NASA Technical Reports Server (NTRS)

    Golden, T. S.; Yaffee, P.

    1979-01-01

    An update is presented for the following projects: (1) asphalt pavement recycling; (2) data collection platform/water quality monitoring; (3) digital emergency traffic routing; (4) fire department communications and dispatch system; (5) health department management information system; (6) hazardous materials; (7) coal gasification; and (8) emergency vehicle proximity sensing.

  20. Irrigation Monitoring Project Results

    NASA Technical Reports Server (NTRS)

    Terrie, Gregory; Berglund, Judith; Ryan, Robert; Harrington, Gary; Stewart, Randy; Spiering, Bruce

    2003-01-01

    The objective of this project is to investigate remote sensing requirements for irrigation scheduling to define future systems. Temperature-based crop stress indicators have been developed that could be used for irrigation management. This viewgraph presentation describes an experiment to use airborne and satellite thermal imagery to evaulate the water requirements of irrigated crops.

  1. The Habitat Project

    ERIC Educational Resources Information Center

    Hein, Annamae J.

    2011-01-01

    The Habitat Project is a multiday, differentiated, interdisciplinary environmental science lesson that incorporates skill-building and motivational strategies to internalize ecosystem vocabulary. Middle school students research an animal, display its physical characteristics on a poster, build a three-dimensional habitat and present their work…

  2. Urban Education Project.

    ERIC Educational Resources Information Center

    Bowling Green State Univ., OH. Coll. of Education.

    A brief description of the Urban Education Project of the Bowling Green State University is presented. Designed to prepare students for teaching urban area youths, the program results in triple certification for the teaching of mildly retarded children (K-12, with or without behavior disorders), learning disabled and/or behaviorally disordered…

  3. MAIZE ALLELIC DIVERSITY PROJECT

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Of the estimated 250-300 races of maize, only 24 races are represented in materials utilized by the Germplasm Enhancement of Maize (GEM) project, a collaborative effort between USDA-ARS and public and private sector research scientists. This is largely a result of poor performance of many races in ...

  4. Amarpurkashi Village Project

    ERIC Educational Resources Information Center

    Singh, Mukat

    1973-01-01

    The Amarpurkashi Village Project in India is an example of a total rural development program that encourages the school-leaving generation to remain. Focus is on the Agro-Industrial Polytechnic that provides training for self-employment and agro-industrial employment. Its approach is an evolving one directed to the rural population. (EA)

  5. Careers Booklet. Project SEARCH.

    ERIC Educational Resources Information Center

    Heart of the Earth Survival School, Minneapolis, MN.

    Developed by the staff of Project SEARCH, this booklet is designed to assist American Indian adults of the Minneapolis-St. Paul area in an exploration of careers. As noted by the introduction, it may also be of interest to Indian high school students, college students, and others who are looking for ideas about the kinds of careers available. The…

  6. Final Year Project Report

    SciTech Connect

    Hubsch, Tristan

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  7. IPAD project overview

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.

    1980-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace-Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of technology and associated software for integrated company-wide management of engineering information. The project has been underway since 1976 under the guidance of an Industry Technical Advisory Board (ITAB) composed of representatives of major engineering and computer companies and in close collaboration with the Air Force Integrated Computer-Aided Manufacturing (ICAM) program. Results to date on the IPAD project include an in-depth documentation of a representative design process for a large engineering project, the definition and design of computer-aided design software needed to support that process, and the release of prototype software to integrate selected design functions. Ongoing work concentrates on development of prototype software to manage engineering information, and initial software is nearing release.

  8. Life Skills Project

    ERIC Educational Resources Information Center

    Bates, Jan P.

    2005-01-01

    In this article, Bates, the Inmate Programs Manager of the Hillsborough County Sheriff's Office in Tampa, Florida, describes her office's Life Skills Project, a comprehensive program that has significantly enhanced three existing programs by adding extensive life skills components. The added life skills modules reinforce the importance of…

  9. Update: School Enrollment Projections.

    ERIC Educational Resources Information Center

    Liner, Charles D.

    1994-01-01

    Statewide enrollment in North Carolina's public schools is expected to increase 9.2% between 1992-93 and 1997-98, and by 15.6% between 1992-93 and 2002-03. Two tables and one figure illustrate these projections. (MLF)

  10. Update: School Enrollment Projections.

    ERIC Educational Resources Information Center

    Liner, Charles D.

    1995-01-01

    During the next decade statewide public school enrollment in North Carolina will continue the upward trend begun in 1990-91, but the rate of growth in enrollment will decline over the decade. Two tables and one figure illustrate the actual and projected enrollment data. (MLF)

  11. A Radio Station Project.

    ERIC Educational Resources Information Center

    Geva, Edna

    2002-01-01

    Describes a radio program in an English-as-a-Foreign-Language classroom in Israel. Classrooms of English students listen carefully to daily broadcasts, waiting to solve the brain teaser. Personal messages and catchy music follow the program. The project has encouraged students to use English actively and purposefully. Evaluation of the broadcasts…

  12. ISOE Pilot Project Update

    SciTech Connect

    D. A. Hagemeyer D. E. Lewis

    2012-05-05

    This slide show introduces the Pilot Project to increase the value of Information System on Occupational Exposure (ISOE) data by increasing participation and amount of data reported from the U.S., reduce the hurdles and effort in participating, streamline the process of reporting and reduce time delay, and eliminate data entry and redundant effort.

  13. Digging into Archaeology Projects.

    ERIC Educational Resources Information Center

    Grambo, Greg

    1996-01-01

    Suggestions are offered for a classroom project of planning and conducting an archaeological dig on or near school property. Principles of archaeological practice such as making drawings of the site and using a grid frame to record locations are explained. Also suggested is a simulation activity in which students pick imbedded "findings" out of…

  14. CONNECT Special Demonstration Project.

    ERIC Educational Resources Information Center

    Hawk, Kim; And Others

    Project CONNECT (Inmate Advocacy) was developed to provide counseling to inmates involved in the education programs at Fayette County Prison in Uniontown, Pennsylvania, before and immediately following their release. Twenty-one inmates who had been selected through a screening process received individual basic skills remediation in a classroom…

  15. The Herpetology Project

    ERIC Educational Resources Information Center

    Vacchina, Peter; Aguirre, Mary

    2008-01-01

    In this article, the authors describe their ongoing experience with the Herpetology Project. Through this field study, students catch and track amphibians and reptiles in the Assabet River area, record and analyze data, share their findings with the community, and ultimately, work toward protecting turtles' habitats. The authors chose to focus on…

  16. COASTAL EMAP PROJECT

    EPA Science Inventory

    Several state and federal agencies are collecting monitoring data. One of the goals of the project is to assist the states in the implementation of their statewide coastal monitoring strategy by dealing with issues of statewide data comparability and information management. The ...

  17. The National SEED Project.

    ERIC Educational Resources Information Center

    Nelson, Cathy L.

    1991-01-01

    The National SEED (Seeking Educational Equity and Diversity) project on Inclusive Curriculum provides K-12 teachers an opportunity for renewal and consideration of gender-inclusive and multicultural curricula. Seminars, led from multiple perspectives, immerse participants in recent scholarship on inclusive education and model teaching strategies…

  18. UNIVERSAL DATA COLLECTION PROJECT

    EPA Science Inventory

    CDC has created the UDC project to maintain a monitoring of the nation's blood supply for those receiving blood products as well as those experiencing hemophilia. CDC is to monitor the extent of the disease, the risk factors, and related complications in persons being treated wit...

  19. Weekend Science Project

    ERIC Educational Resources Information Center

    Santos, Karey

    2012-01-01

    Weekend plans...every family has them. Whether it's fishing, swimming, or simply picnicking by the river, water plays a significant role in many recreational endeavors. Encouraging students and their families to use their "scientific eyes" to explore these wonderful wet places is what Weekend Science Project is all about. Weekend Science Project…

  20. Elder Abuse Awareness Project.

    ERIC Educational Resources Information Center

    Morrow, Marilyn J.; Doyle, Kathleen

    The Elder Abuse Awareness Project was developed to determine the incidence of abuse and neglect of elderly people in several rural counties in central Illinois. A primary purpose of the study was to survey service providers as to their actual encounters with elder abuse and neglect. Each provider was asked about warning signs or cues that were…

  1. The Ethiopian Orphanage Project

    ERIC Educational Resources Information Center

    LaVecchia, Antoinette

    2010-01-01

    The Ethiopian Orphanage Project was the brainchild of a prominent pediatrician who, through her foundation and private practice, has been saving the physical and emotional lives of children for years, both in the United States and abroad, with a focus on HIV+ orphans in developing countries. Three years ago, after introducing ARVs (antiretroviral…

  2. An Infants School Project.

    ERIC Educational Resources Information Center

    Greenhalgh, Lynn

    1995-01-01

    Describes a wildlife garden developed on school grounds which converted a large, derelict quadrangle into an outdoor classroom used by staff across the curriculum. The area was divided into various habitats including ponds, mini-woodlands, herb garden, hedgerows, wildflower meadow, and bird borders. Preparatory work and projects generated are…

  3. SERT C project study

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The SERT C (Space Electric Rocket Test - C) project study defines a spacecraft mission that would demonstrate the technology readiness of ion thruster systems for primary propulsion and station keeping applications. As a low cost precursor, SERT C develops the components and systems required for subsequent Solar Electric Propulsion (SEP) applications. The SERT C mission requirements and preliminary spacecraft and subsystem design are described.

  4. Teacher-Training Projects

    ERIC Educational Resources Information Center

    Greer, Leslie

    1977-01-01

    The Sociedade Brasileira de Cultura Inglesa of Sao Paolo, Brazil, is an English teaching center which also runs an introductory course to train teachers of English. This article describes some of the projects completed by prospective teachers; they include language games, pictures, cartoons, role-playing and writing creative dialogue. (CHK)

  5. Optoelectronic fringe projection operations

    NASA Astrophysics Data System (ADS)

    Garavaglia, Mario; Rabal, Hector J.; Aguirre, E.

    1990-07-01

    We present a simple optoelectronical fringe projection method for topographic or deformation study of objects. Programmed positioning and repositioning can also be performed. 1. DESCRIPTION An incoherent method for fringe projection operations was recently reported'' using photographic procedures. It is extended now to real time operation using an LCD video projector and a CCD camera. Fringes consisting in Rbnchitype rulings are generated in a personal computer and projected onto an object by using a Kodak LCD colour video projector. Its image is then read by a SVHS-CCD Panasonic camera and electronically memorized. This fringe pattern contains information concerning the position and topography of the object stored as fringe phase modulation. A standard state of the object can be frozen in the screen of a monitor and its evolution deformation or misspositioning followed through the Moire between current and stored fringes. Topography of the object expressed as a mathemati cal functi on h ( x y) and its time evolution can alsO be determined from the memorized data. . Besides a conjugated grid can be generated so that when the latter is projected onto the object the observed fringes are corrected to straight lines resembling the original Ronchi rul ings i. e. distortion produced by object topography is cancelled out. Deformations with respect to this state are straightforwardly interpreted by an observer both in magnitude and sign. The system can be made

  6. The Crime Lab Project.

    ERIC Educational Resources Information Center

    Hein, Annamae J.

    2003-01-01

    Describes the Crime Lab Project, which takes an economical, hands-on, interdisciplinary approach to studying the career of forensics in the middle or high school classroom. Includes step-by-step student requirements for the investigative procedure, a sample evidence request form, and an assessment rubric. (KHR)

  7. Compendium of Project Profiles.

    ERIC Educational Resources Information Center

    Phelps, L. Allen; And Others

    This compendium, which is part of a series, describes the current status of 105 demonstration projects funded by the United States Department of Education, Office of Special Education and Rehabilitative Services, as part of the Transition Initiative to help disabled youth make the transition from schooling to successful employment. Eight major…

  8. The EPA Liver Project

    EPA Science Inventory

    The v-Liver is part of a broader EPA effort on Virtual Tissues (VT) aimed at reducing the magnitude and spectrum of animal testing by integrative in silico and in vitro models, which recapitulate the properties of intact organs. The other VT projects include the Virtual Embryo (...

  9. Icosahedrons: A Multifaceted Project.

    ERIC Educational Resources Information Center

    Strazdin, Ray

    2000-01-01

    Discusses a project focusing on icosahedrons that combines geometry, structure, graphic design, animation, motion, and mechanical and freehand drawing with ancient Greek catapult mechanics. Includes directions on how to both construct a template and develop the pattern for the icosahedrons. (CMK)

  10. The Wish Tree Project

    ERIC Educational Resources Information Center

    Brooks, Sarah DeWitt

    2010-01-01

    This article describes the author's experience in implementing a Wish Tree project in her school in an effort to bring the school community together with a positive art-making experience during a potentially stressful time. The concept of a wish tree is simple: plant a tree; provide tags and pencils for writing wishes; and encourage everyone to…

  11. A Helical Stairway Project

    ERIC Educational Resources Information Center

    Farmer, Tom

    2008-01-01

    We answer a geometric question that was raised by the carpenter in charge of erecting helical stairs in a 10-story hospital. The explanation involves the equations of lines, planes, and helices in three-dimensional space. A brief version of the question is this: If A and B are points on a cylinder and the line segment AB is projected radially onto…

  12. Directory of Projects, 1998.

    ERIC Educational Resources Information Center

    National Inst. on Early Childhood Development and Education (ED/OERI), Washington, DC.

    The National Institute on Early Childhood Development and Education (ECI) was established to carry out a comprehensive program of research, development, and dissemination to improve young children's learning and development. This directory contains information on the programs and projects funded by ECI in fiscal year 1998. The directory's 10…

  13. Cognitive Education Project.

    ERIC Educational Resources Information Center

    Mulcahy, Robert; And Others

    The Cognitive Education Project centered at the University of Alberta undertook a 3-year longitudinal evaluation of two cognitive education programs aimed at teaching thinking skills. The critical difference between the two experimental programs was that one, Feuerstein's Instrumental Enrichment (IE) method was taught out of curricular content,…

  14. Adult Counseling Project.

    ERIC Educational Resources Information Center

    Perrone, Phil; Davis, Sandy A.

    In order to determine the specific counseling needs of the adult learner, staff of the Adult Counseling Project began by conducting a literature search pertaining to the problems of returning students and those considering a return to school. The review revealed that little is known about the educational and vocational needs of the returning…

  15. Science in Schools Project

    NASA Astrophysics Data System (ADS)

    Waugh, Mike

    As part of a program to increase learning and engagement in science classes 124 Victorian schools are trialing a best practice teaching model. The Science in Schools Research Project is a DEET funded project under the Science in Schools Strategy, developed in response to recent research and policy decisions at national and state levels through which literacy, numeracy and science have been identified as key priorities for learning. This major science research project aims to identify, develop and trial best practice in Science teaching and learning. The Department will then be able to provide clear advice to Victoria's schools that can be adopted and sustained to: * enhance teaching and learning of Science * enhance student learning outcomes in Science at all year levels * increase student access to, and participation in Science learning from Prep through to Year 10, and hence in the VCE as well. The nature of the SiS program will be detailed with specific reference to the innovative programs in solar model cars, robotics and environmental science developed at Forest Hill College in response to this project.

  16. ACCESS Project: Final Report

    SciTech Connect

    Weller, Heiko

    2015-04-01

    The ACCESS project addressed the development, testing, and demonstration of the proposed advanced technologies and the associated emission and fuel economy improvement at an engine dynamometer and on a full-scale vehicle. Improve fuel economy by 25% with minimum performance penalties Achieve SULEV level emissions with gasoline Demonstrate multi-mode combustion engine management system

  17. Projects in Musical Acoustics

    ERIC Educational Resources Information Center

    Firth, Ian

    1974-01-01

    These projects utilize musical instruments to teach the physics of sound by investigating standing waves in strings and plates, main resonance of stringed instruments, loudness curves, and analysis of tones. Can be adapted for secondary level or college level instruction. (MLH)

  18. Project SERAPHIM Report.

    ERIC Educational Resources Information Center

    Moore, John W.

    1983-01-01

    Lists and briefly describes computer programs recently added to those currently available from Project SERAPHIM. Program name, subject, hardware, author, supplier, and cost are provided in separate listings for Apple, PET, TRS-80 I or III, IBM, VIC-20, TERAK, and PDP-11 microcomputers. Includes corrections for two current Apple programs. (JN)

  19. The Argonne Braille Project.

    ERIC Educational Resources Information Center

    Grunwald, Arnold

    A project summary and 20 related papers are presented on the Argonne Braille Machine, a device which produces braille-equivalent information on magnetic tape rather than embossing dots on paper. The summary traces the machine's development while 10 papers cover such issues as user reactions, evaluation proposals, use and care of the machine, the…

  20. The Visual Identity Project

    ERIC Educational Resources Information Center

    Tennant-Gadd, Laurie; Sansone, Kristina Lamour

    2008-01-01

    Identity is the focus of the middle-school visual arts program at Cambridge Friends School (CFS) in Cambridge, Massachusetts. Sixth graders enter the middle school and design a personal logo as their first major project in the art studio. The logo becomes a way for students to introduce themselves to their teachers and to represent who they are…

  1. Praise Acres Project

    ERIC Educational Resources Information Center

    Hayes, Carolyn

    2004-01-01

    In this article, the author presents the "Praise Acres Project," which was initiated from a letter written by a local resident. The resident wrote about an idea to develop a wetlands and outdoor lab facility on his property for students. Thus, a plan was conceived that would not only benefit the owner, but also enhance high school science…

  2. The ARL Microform Project.

    ERIC Educational Resources Information Center

    Association of Research Libraries, Washington, DC.

    In 1980, a study was conducted for the Association of Research Libraries (ARL) by Information Systems Consultants (ISCI) which led to the establishment of the ARL Microform Project. Based on a three-part survey, to which a total of 848 academic, government, public, and special libraries responded, the ISCI study covered: (1) general microform…

  3. Projectable Basic Electronics Kit.

    ERIC Educational Resources Information Center

    H'ng, John; And Others

    1982-01-01

    Outlines advantages derived from constructing and using a Projectable Basic Electronics Kit and provides: (1) list of components; (2) diagrams of 10 finished components (resistor; capacitor; diode; switch; bulb; transistor; meter; variable capacitor; coil; connecting terminal); and (3) diode and transistor activities. (JN)

  4. Directory of Projects, 1997.

    ERIC Educational Resources Information Center

    National Inst. on Early Childhood Development and Education (ED/OERI), Washington, DC.

    The National Institute on Early Childhood Development and Education (ECI) was established by the U.S. Department of Education to carry out a comprehensive program of research, development, and dissemination to improve young children's learning and development. This directory contains information on the programs and projects funded by ECI in fiscal…

  5. The Radio Jove Project

    NASA Technical Reports Server (NTRS)

    Thieman, J. R.

    2010-01-01

    The Radio love Project is a hands-on education and outreach project in which students, or any other interested individuals or groups build a radio telescope from a kit, operate the radio telescope, transmit the resulting signals through the internet if desired, analyze the results, and share the results with others through archives or general discussions among the observers. Radio love is intended to provide an introduction to radio astronomy for the observer. The equipment allows the user to observe radio signals from Jupiter, the Sun, the galaxy, and Earth-based radiation both natural and man-made. The project was started through a NASA Director's Discretionary Fund grant more than ten years ago. it has continued to be carried out through the dedicated efforts of a group of mainly volunteers. Dearly 1500 kits have been distributed throughout the world. Participation can also be done without building a kit. Pre-built kits are available. Users can also monitor remote radio telescopes through the internet using free downloadable software available through the radiosky.com website. There have been many stories of prize-winning projects, inspirational results, collaborative efforts, etc. We continue to build the community of observers and are always open to new thoughts about how to inspire the observers to still greater involvement in the science and technology associated with Radio Jove.

  6. The History Education Project.

    ERIC Educational Resources Information Center

    Seifman, Eli

    In addition to briefly intoducing the History Education Project (HEP) sponsored by the American Historical Association and Indiana University, and funded by USOE, this report announces the establishment (Spring, 1970) of a regional HEP team at Stony Brook, describes its tentative plan of operation, and solicits assistance from the community. The…

  7. The European Project TILA

    ERIC Educational Resources Information Center

    Jauregi, Kristi; Melchor-Couto, Sabela; Beltrán, Elina Vilar

    2013-01-01

    Telecollaboration for Intercultural Language Acquisition (TILA), is an EU-funded project within the Lifelong Learning Programme that will run between January 2013 and June 2015. TILA's overall objectives are: (1) to innovate, enrich and make foreign language teaching programmes more attractive and effective by encouraging the implementation of…

  8. The MERMAID project

    NASA Technical Reports Server (NTRS)

    Cowderoy, A. J. C.; Jenkins, John O.; Poulymenakou, A

    1992-01-01

    The tendency for software development projects to be completed over schedule and over budget was documented extensively. Additionally many projects are completed within budgetary and schedule target only as a result of the customer agreeing to accept reduced functionality. In his classic book, The Mythical Man Month, Fred Brooks exposes the fallacy that effort and schedule are freely interchangeable. All current cost models are produced on the assumption that there is very limited scope for schedule compression unless there is a corresponding reduction in delivered functionality. The Metrication and Resources Modeling Aid (MERMAID) project, partially financed by the Commission of the European Communities (CEC) as Project 2046 began in Oct. 1988 and its goal were as follows: (1) improvement of understanding of the relationships between software development productivity and product and process metrics; (2) to facilitate the widespread technology transfer from the Consortium to the European Software Industry; and (3) to facilitate the widespread uptake of cost estimation techniques by the provision of prototype cost estimation tools. MERMAID developed a family of methods for cost estimation, many of which have had tools implemented in prototypes. These prototypes are best considered as toolkits or workbenches.

  9. The Button Project

    ERIC Educational Resources Information Center

    Armstrong, Charley

    2005-01-01

    In this article, the author describes The Button Project. It started as a dream, a need to educate future generations about the Holocaust, to teach tolerance, and to remember the past. Under the auspices of the Jewish Federation of Peoria, a small band of people joined together with the goal of teaching people about the Holocaust so that it will…

  10. Spaceship Earth Curriculum Project.

    ERIC Educational Resources Information Center

    McInnis, Noel; And Others

    Three separate papers from the Project are included in this document. One of these, by the Center staff, is entitled "Potentials of the Spaceship Earth Metaphor". It discusses static, dynamic, and analogic representations of spaceship earth and their educational value. A second paper, "Some Resources for Introducing Environmental Education Into…

  11. Payload Documentation Enhancement Project

    NASA Technical Reports Server (NTRS)

    Brown, Betty G.

    1999-01-01

    In late 1998, the Space Shuttle Program recognized a need to revitalize its payload accommodations documentation. As a result a payload documentation enhancement project was initiated to review and update payload documentation and improve the accessibility to that documentation by the Space Shuttle user community.

  12. Concurrent Software Engineering Project

    ERIC Educational Resources Information Center

    Stankovic, Nenad; Tillo, Tammam

    2009-01-01

    Concurrent engineering or overlapping activities is a business strategy for schedule compression on large development projects. Design parameters and tasks from every aspect of a product's development process and their interdependencies are overlapped and worked on in parallel. Concurrent engineering suffers from negative effects such as excessive…

  13. Occupant Protection Project

    NASA Technical Reports Server (NTRS)

    Bopp, Genie; Somers, Jeff; Granderson, Brad; Gernhardt, Mike; Currie, Nancy; Lawrence, Chuck

    2010-01-01

    Topics include occupant protection overview with a focus on crew protection during dynamic phases of flight; occupant protection collaboration; modeling occupant protection; occupant protection considerations; project approach encompassing analysis tools, injury criteria, and testing program development; injury criteria update methodology, unique effects of pressure suits and other factors; and a summary.

  14. Climate Change Schools Project...

    ERIC Educational Resources Information Center

    McKinzey, Krista

    2010-01-01

    This article features the award-winning Climate Change Schools Project which aims to: (1) help schools to embed climate change throughout the national curriculum; and (2) showcase schools as "beacons" for climate change teaching, learning, and positive action in their local communities. Operating since 2007, the Climate Change Schools Project…

  15. The Great Mathematician Project

    ERIC Educational Resources Information Center

    Goldberg, Sabrina R.

    2013-01-01

    The Great Mathematician Project (GMP) introduces both mathematically sophisticated and struggling students to the history of mathematics. The rationale for the GMP is twofold: first, mathematics is a uniquely people-centered discipline that is used to make sense of the world; and second, students often express curiosity about the history of…

  16. The Legacy Project

    ERIC Educational Resources Information Center

    Moye, Johnny J.

    2012-01-01

    This article is the first in a series of articles entitled "The Legacy Project." It focuses on the lives and actions of leaders who have forged technology engineering education profession into what it is today. Members of the profession owe a debt of gratitude to these leaders. One simple way to demonstrate that gratitude is to recognize them and…

  17. The RMIT Wuhan Project.

    ERIC Educational Resources Information Center

    Silver, Alan

    In March 1995, Australia's Royal Melbourne Institute of Technology began offering Australian and Chinese students an Associate Diploma of Business in International Trade at the Wuhan Yejin University of Science and Technology, in China. The course is offered at the University's China Iron and Steel Industry Training Centre, a joint project between…

  18. The History Research Project

    ERIC Educational Resources Information Center

    Estes, Matt; Brady, Ann

    2005-01-01

    Matt Estes, a social studies teacher, mentions the main instructional goals for his students like understanding the importance of proper citation and attribution presenting the Machiavelli project that deals with the skills he wants his students to develop and the course material that must be covered. In addition, Ann Brady, a library media…

  19. Interstate Electrification Improvement Project

    SciTech Connect

    Puckette, Margaret; Kim, Jeff

    2015-07-01

    The Interstate Electrification Improvement Project, publicly known as the Shorepower Truck Electrification Project (STEP), started in May 2011 and ended in March 2015. The project grant was awarded by the Department of Energy’s Vehicles Technology Office in the amount of $22.2 million. It had three overarching missions: 1. Reduce the idling of Class 8 tractors when parked at truck stops, to reduce diesel fuel consumption and thus U.S. dependence on foreign petroleum; 2. Stimulate job creation and economic activity as part of the American Reinvestment and Recovery Act of 2009; 3. Reduce greenhouse gas emissions (GHG) from diesel combustion and the carbon footprint of the truck transportation industry. The project design was straightforward. First, build fifty Truck Stop Electrification (TSE) facilities in truck stop parking lots across the country so trucks could plug-in to 110V, 220V, or 480VAC, and shut down the engine instead of idling. These facilities were strategically located at fifty truck stops along major U.S. Interstates with heavy truck traffic. Approximately 1,350 connection points were installed, including 150 high-voltage electric standby Transport Refrigeration Unit (eTRU) plugs--eTRUs are capable of plugging in to shore power1 to cool the refrigerated trailer for loads such as produce, meats and ice cream. Second, the project provided financial incentives on idle reduction equipment to 5,000 trucks in the form of rebates, to install equipment compatible with shore power. This equipment enables drivers to shut down the main engine when parked, to heat or cool their cab, charge batteries, or use other household appliances without idling—a common practice that uses approximately 1 gallon of diesel per hour. The rebate recipients were intended to be the first fleets to plug into Shorepower to save diesel fuel and ensure there is significant population of shore power capable trucks. This two part project was designed to complement each other by

  20. Energy Storage Project

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.; Jankovsky, Amy L.; Reid, Concha M.; Miller, Thomas B.; Hoberecht, Mark A.

    2011-01-01

    NASA's Exploration Technology Development Program funded the Energy Storage Project to develop battery and fuel cell technology to meet the expected energy storage needs of the Constellation Program for human exploration. Technology needs were determined by architecture studies and risk assessments conducted by the Constellation Program, focused on a mission for a long-duration lunar outpost. Critical energy storage needs were identified as batteries for EVA suits, surface mobility systems, and a lander ascent stage; fuel cells for the lander and mobility systems; and a regenerative fuel cell for surface power. To address these needs, the Energy Storage Project developed advanced lithium-ion battery technology, targeting cell-level safety and very high specific energy and energy density. Key accomplishments include the development of silicon composite anodes, lithiated-mixed-metal-oxide cathodes, low-flammability electrolytes, and cell-incorporated safety devices that promise to substantially improve battery performance while providing a high level of safety. The project also developed "non-flow-through" proton-exchange-membrane fuel cell stacks. The primary advantage of this technology set is the reduction of ancillary parts in the balance-of-plant--fewer pumps, separators and related components should result in fewer failure modes and hence a higher probability of achieving very reliable operation, and reduced parasitic power losses enable smaller reactant tanks and therefore systems with lower mass and volume. Key accomplishments include the fabrication and testing of several robust, small-scale nonflow-through fuel cell stacks that have demonstrated proof-of-concept. This report summarizes the project s goals, objectives, technical accomplishments, and risk assessments. A bibliography spanning the life of the project is also included.

  1. ARJIS satellite demonstration project

    NASA Astrophysics Data System (ADS)

    Severance, Steve; Williams, Carl

    2005-06-01

    In 2003, the California Space Authority (CSA) was provided funding by the U. S. Congress through the Defense Appropriations Act to develop a project that would demonstrate the U.S. space enterprise capability that would contribute to the effectiveness of those engaged in Homeland Security. The project was given broad latitude in selecting the area of Homeland Security to be addressed and the nature of the space technology to be applied. CSA became aware of a nascent law enforcement data-sharing project in the San Diego region known as the Automated Regional Justice Information System (ARJIS). First developed by the police departments in San Diego, ARJIS is an innovative system that shares criminal justice information among 50 federal, state, and local agencies. ARJIS was completing a pilot project that enabled officers to receive information on handheld computers, which was transmitted wirelessly through cellular networks. The accessed information came from several databases that collectively contained the entire region's crime and arrest reports, traffic citations, and incidents, as well as state and county wants and warrants. The fundamental limitations that plague all cellular-based devices caught CSA's attention and resulted in a cooperative effort to harden the communications link between the patrol officer and critical data. The principal goal of the SATCOM development task was to create a proof-of-concept application that would use SATCOM links to augment the current ARJIS handheld wireless (cellular) capability. The successful technical demonstration and the positive support for satellite communications from the law enforcement community showed that this project filled a need-both for improved information sharing and for highly reliable communications systems.

  2. Ceramic Technology Project

    SciTech Connect

    Not Available

    1992-03-01

    The Ceramic Technology Project was developed by the USDOE Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS's Materials Development Program, was developed to meet the ceramic technology requirements of the OTS's automotive technology programs. Significant accomplishments in fabricating ceramic components for the USDOE and NASA advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. These programs have also demonstrated that additional research is needed in materials and processing development, design methodology, and data base and life prediction before industry will have a sufficient technology base from which to produce reliable cost-effective ceramic engine components commercially. A five-year project plan was developed with extensive input from private industry. In July 1990 the original plan was updated through the estimated completion of development in 1993. The objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on the structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines. To facilitate the rapid transfer of this technology to US industry, the major portion of the work is being done in the ceramic industry, with technological support from government laboratories, other industrial laboratories, and universities.

  3. Preserving the Manhattan Project

    NASA Astrophysics Data System (ADS)

    Kelly, Cynthia

    2014-03-01

    When future generations look back on the 20th century, few events will rival the harnessing of nuclear energy as a turning point in world history, science and society. Yet, the Department of Energy has not always embraced its Manhattan Project origins. The presentation will focus on the progress made over the last 20 years to preserve the properties and first-hand accounts that for decades have been threatened with demolition and indifference. Since the mid-1950s, most remaining Manhattan Project properties at the Los Alamos National Laboratory had been abandoned. Among them was a cluster of wooden buildings called the ``V Site.'' This is where scientists assembled the ``Gadget,'' the world's first atomic device tested on July 16, 1945. Regardless of its significance, the ``V Site'' buildings like all the rest were slated for demolition. The Advisory Council on Historic Preservation (ACHP) toured the properties in November 1998. Most could not believe that the world's first atomic bomb was designed in such humble structures. The properties were declared to be ``monumental in their lack of monumentality.'' A Save America's Treasures grant for 700,000 was awarded to restore the properties. To raise the required matching funds, I left the Federal government and soon founded the Atomic Heritage Foundation. The presentation will trace the progress made over the last decade to generate interest and support nationwide to preserve the Manhattan Project heritage. Saving both the physical properties and first-hand accounts of the men and women have been a priority. Perhaps our most significant achievement may be legislation now under consideration by Congress to create a Manhattan Project National Historical Park. Seventy years later, the Manhattan Project is finally getting the recognition it deserves.

  4. Breakthrough Propulsion Physics Project: Project Management Methods

    NASA Technical Reports Server (NTRS)

    Millis, Marc G.

    2004-01-01

    To leap past the limitations of existing propulsion, the NASA Breakthrough Propulsion Physics (BPP) Project seeks further advancements in physics from which new propulsion methods can eventually be derived. Three visionary breakthroughs are sought: (1) propulsion that requires no propellant, (2) propulsion that circumvents existing speed limits, and (3) breakthrough methods of energy production to power such devices. Because these propulsion goals are presumably far from fruition, a special emphasis is to identify credible research that will make measurable progress toward these goals in the near-term. The management techniques to address this challenge are presented, with a special emphasis on the process used to review, prioritize, and select research tasks. This selection process includes these key features: (a) research tasks are constrained to only address the immediate unknowns, curious effects or critical issues, (b) reliability of assertions is more important than the implications of the assertions, which includes the practice where the reviewers judge credibility rather than feasibility, and (c) total scores are obtained by multiplying the criteria scores rather than by adding. Lessons learned and revisions planned are discussed.

  5. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    ERIC Educational Resources Information Center

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  6. Artificial Gravity Research Project

    NASA Technical Reports Server (NTRS)

    Kamman, Michelle R.; Paloski, William H.

    2005-01-01

    Protecting the health, safety, and performance of exploration-class mission crews against the physiological deconditioning resulting from long-term weightlessness during transit and long-term hypogravity during surface operations will require effective, multi-system countermeasures. Artificial gravity (AG), which would replace terrestrial gravity with inertial forces generated by rotating the transit vehicle or by a human centrifuge device within the transit vehicle or surface habitat, has long been considered a potential solution. However, despite its attractiveness as an efficient, multi-system countermeasure and its potential for improving the environment and simplifying operational activities (e.g., WCS, galley, etc.), much still needs to be learned regarding the human response to rotating environments before AG can be successfully implemented. This paper will describe our approach for developing and implementing a rigorous AG Research Project to address the key biomedical research questions that must be answered before developing effective AG countermeasure implementation strategies for exploration-class missions. The AG Research Project will be performed at JSC, ARC, extramural academic and government research venues, and international partner facilities maintained by DLR and IMBP. The Project includes three major ground-based human research subprojects that will lead to flight testing of intermittent short-radius AG in ISS crewmembers after 201 0, continuous long-radius AG in CEV crews transiting to and from the Moon, and intermittent short-radius AG plus exercise in lunar habitats. These human ground-based subprojects include: 1) a directed, managed international short-radius project to investigate the multi-system effectiveness of intermittent AG in human subjects deconditioned by bed rest, 2) a directed, managed long-radius project to investigate the capacity of humans to live and work for extended periods in rotating environments, and 3) a focused

  7. Parallel Eclipse Project Checkout

    NASA Technical Reports Server (NTRS)

    Crockett, Thomas M.; Joswig, Joseph C.; Shams, Khawaja S.; Powell, Mark W.; Bachmann, Andrew G.

    2011-01-01

    Parallel Eclipse Project Checkout (PEPC) is a program written to leverage parallelism and to automate the checkout process of plug-ins created in Eclipse RCP (Rich Client Platform). Eclipse plug-ins can be aggregated in a feature project. This innovation digests a feature description (xml file) and automatically checks out all of the plug-ins listed in the feature. This resolves the issue of manually checking out each plug-in required to work on the project. To minimize the amount of time necessary to checkout the plug-ins, this program makes the plug-in checkouts parallel. After parsing the feature, a request to checkout for each plug-in in the feature has been inserted. These requests are handled by a thread pool with a configurable number of threads. By checking out the plug-ins in parallel, the checkout process is streamlined before getting started on the project. For instance, projects that took 30 minutes to checkout now take less than 5 minutes. The effect is especially clear on a Mac, which has a network monitor displaying the bandwidth use. When running the client from a developer s home, the checkout process now saturates the bandwidth in order to get all the plug-ins checked out as fast as possible. For comparison, a checkout process that ranged from 8-200 Kbps from a developer s home is now able to saturate a pipe of 1.3 Mbps, resulting in significantly faster checkouts. Eclipse IDE (integrated development environment) tries to build a project as soon as it is downloaded. As part of another optimization, this innovation programmatically tells Eclipse to stop building while checkouts are happening, which dramatically reduces lock contention and enables plug-ins to continue downloading until all of them finish. Furthermore, the software re-enables automatic building, and forces Eclipse to do a clean build once it finishes checking out all of the plug-ins. This software is fully generic and does not contain any NASA-specific code. It can be applied to any

  8. Apollo - LOLA project

    NASA Technical Reports Server (NTRS)

    1961-01-01

    Project LOLA. Test subject sitting at the controls: Project LOLA or Lunar Orbit and Landing Approach was a simulator built at Langley to study problems related to landing on the lunar surface. It was a complex project that cost nearly $2 million dollars. James Hansen wrote: 'This simulator was designed to provide a pilot with a detailed visual encounter with the lunar surface; the machine consisted primarily of a cockpit, a closed-circuit TV system, and four large murals or scale models representing portions of the lunar surface as seen from various altitudes. The pilot in the cockpit moved along a track past these murals which would accustom him to the visual cues for controlling a spacecraft in the vicinity of the moon. Unfortunately, such a simulation--although great fun and quite aesthetic--was not helpful because flight in lunar orbit posed no special problems other than the rendezvous with the LEM, which the device did not simulate. Not long after the end of Apollo, the expensive machine was dismantled.' (p. 379) Ellis J. White wrote in his paper, 'Discussion of Three Typical Langley Research Center Simulation Programs' : 'A typical mission would start with the first cart positioned on model 1 for the translunar approach and orbit establishment. After starting the descent, the second cart is readied on model 2 and, at the proper time, when superposition occurs, the pilot's scene is switched from model 1 to model 2. then cart 1 is moved to and readied on model 3. The procedure continues until an altitude of 150 feet is obtained. The cabin of the LM vehicle has four windows which represent a 45 degree field of view. The projection screens in front of each window represent 65 degrees which allows limited head motion before the edges of the display can be seen. The lunar scene is presented to the pilot by rear projection on the screens with four Schmidt television projectors. The attitude orientation of the vehicle is represented by changing the lunar scene

  9. Exe-Guard Project

    SciTech Connect

    Smith, Rhett; Marshall, Tim; Chavez, Adrian; Bratus, Sergey

    2015-12-26

    The exe-Guard Project is an alliance between Dominion Virginia Power (DVP), Sandia National Laboratories (SNL), Dartmouth University, and Schweitzer Engineering Laboratories (SEL). SEL is primary recipient on this project. The exe-Guard project was selected for award under DE-FOA-0000359 with CFDA number 81.122 to address Topic Area of Interest 4: Hardened platforms and Systems. The exe-Guard project developed an antivirus solution for control system embedded devices to prevent the execution of unauthorized code and maintain settings and configuration integrity. This project created a white list antivirus solution for control systems capable of running on embedded Linux® operating systems. White list antivirus methods allow only credible programs to run through the use of digital signatures and hash functions. Once a system’s secure state is baselined, white list antivirus software denies deviations from that state because of the installation of malicious code as this changes hash results. Black list antivirus software has been effective in traditional IT environments but has negative implications for control systems. Black list antivirus uses pattern matching and behavioral analysis to identify system threats while relying on regular updates to the signature file and recurrent system scanning. Black list antivirus is vulnerable to zero day exploits which have not yet been incorporated into a signature file update. System scans hamper the performance of high availability applications, as revealed in NIST special publication 1058 which summarizes the impact of blacklist antivirus on control systems: Manual or “on-demand” scanning has a major effect on control processes in that they take CPU time needed by the control process (Sometimes close to 100% of CPU time). Minimizing the antivirus software throttle setting will reduce but not eliminate this effect. Signature updates can also take up to 100% of CPU time, but for a much shorter period than a typical

  10. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  11. Project ASTRO - Tucson

    NASA Astrophysics Data System (ADS)

    Walker, C. E.; Jacoby, S. H.

    2001-05-01

    Led by NOAO Educational Outreach, Project ASTRO-Tucson has reached nearly 14,000 2nd - 9th grade students over the last six years by forming ongoing partnerships of teachers and astronomers. To foster and facilitate these partnerships, the Project ASTRO-Tucson website now features activities and resources of interest to astronomers and teachers. Highlights include a video showing frame by frame impact of projectiles in flour from the popular ``Universe at Your Fingertips'' activity, ``Experimenting with Craters'', and a forum for discussing the integration of astronomy, inquiry, writing and art within the framework of Moon Journals. This work is funded by the National Science Foundation and NASA IDEAS Grant #ED-90207.01-99A,

  12. Land Cover Trends Project

    USGS Publications Warehouse

    Acevedo, William

    2006-01-01

    The Land Cover Trends Project is designed to document the types, rates, causes, and consequences of land cover change from 1973 to 2000 within each of the 84 U.S. Environmental Protection Agency (EPA) Level III ecoregions that span the conterminous United States. The project's objectives are to: * Develop a comprehensive methodology using probability sampling and change analysis techniques and Landsat Multispectral Scanner (MSS), Thematic Mapper (TM), and Enhanced Thematic Mapper (ETM) data for estimating regional land cover change. * Characterize the spatial and temporal characteristics of conterminous U.S. land cover change for five periods from 1973 to 2000 (nominally 1973, 1980, 1986, 1992, and 2000). * Document the regional driving forces and consequences of change. * Prepare a national synthesis of land cover change.

  13. KSC History Project

    NASA Technical Reports Server (NTRS)

    Moore, Patrick K.

    2002-01-01

    The 2002 NASA/ASEE KSC History Project focused on a series of seven history initiatives designed to acquire, preserve, and interpret the history of Kennedy Space Center. These seven projects included the co-authoring of Voices From the Cape, historical work with NASA historian Roger Launius, the completion of a series of oral histories with key KSC personnel, a monograph on Public Affairs, the development of a Historical Concept Map (CMap) for history knowledge preservation, advice on KSC history database and web interface capabilities, the development of a KSC oral history program and guidelines of training and collection, and the development of collaborative relationships between Kennedy Space Center, the University of West Florida, and the University of Central Florida.

  14. Fermilab Library projects

    SciTech Connect

    Garrett, P.; Ritchie, D.

    1990-05-03

    Preprint database management as done at various centers -- the subject of this workshop -- is hard to separate from the overall activities of the particular center. We therefore present the wider context at the Fermilab Library into which preprint database management fits. The day-to-day activities of the Library aside, the dominant activity at present is that of the ongoing Fermilab Library Automation. A less dominant but relatively time-consuming activity is that of doing more online searches in commercial databases on behalf of laboratory staff and visitors. A related activity is that of exploring the benefits of end-user searching of similar sources as opposed to library staff searching of the same. The Library Automation Project, which began about two years ago, is about to go fully online.'' The rationale behind this project is described in the documents developed during the December 1988--February 1989 planning phase.

  15. Swamp Works- Multiple Projects

    NASA Technical Reports Server (NTRS)

    Carelli, Jonathan M.; Schuler, Jason M.; Chandler, Meredith L.

    2013-01-01

    My Surface Systems internship over the summer 2013 session covered a broad range of projects that utilized multiple fields of engineering and technology. This internship included a project to create a command center for a 120 ton regolith bin, for the design and assembly of a blast shield to add further protection for the Surface Systems engineers, for the design and assembly of a portable four monitor hyper wall strip that could extend as large as needed, research and programming a nano drill that could be utilized on a next generation robot or rover, and social media tasks including the making of videos, posting to social networking websites and creation of a new outreach program to help spread the word about the Swamp Works laboratory.

  16. DSN human factors project

    NASA Technical Reports Server (NTRS)

    Chafin, R. L.; Martin, T. H.

    1980-01-01

    The project plan was to hold focus groups to identify the factors influencing the ease of use characteristics of software and to bond the problem. A questionnaire survey was conducted to evaluate those factors which were more appropriately measured with that method. The performance oriented factors were analyzed and relationships hypothesized. The hypotheses were put to test in the experimental phase of the project. In summary, the initial analysis indicates that there is an initial performance effect favoring computer controlled dialogue but the advantage fades fast as operators become experienced. The user documentation style is seen to have a significant effect on performance. The menu and prompt command formats are preferred by inexperienced operators. The short form mnemonic is least favored. There is no clear best command format but the short form mnemonic is clearly the worst.

  17. Project DEEP STEAM

    NASA Astrophysics Data System (ADS)

    Aeschliman, D. P.; Clay, R. G.; Donaldson, A. B.; Eisenhawer, S. W.; Fox, R. L.; Johnson, D. R.; Mulac, A. J.

    1982-01-01

    The objective of Project DEEP STEAM is to develop the technology to economically produce heavy oils from deep reservoirs. The tasks included in this project are the development of thermally efficient delivery systems and downhole steam generation systems. During the period January 1-March 31, 1981, effort has continued on a low pressure combustion downhole generator (Rocketdyne), and on two high pressure designs (Foster-Miller Associates, Sandia National Laboratories). The Sandia design was prepared for deployment in the Wilmington Field at Long Beach, California. Progress continued on the Min-Stress II packer concept at L'Garde, Inc., and on the extruded metal packer at Foster-Miller. Initial bare string field data are reported on the insulated tubular test at Lloydminster, Saskatchewan, Canada.

  18. KSC History Project

    NASA Technical Reports Server (NTRS)

    Moore, Patrick K.

    2003-01-01

    The 2003 NASA/ASEE KSC History Project focused on a series of six history initiatives designed to acquire, preserve, and interpret the history of Kennedy Space Center. These six projects included the completion of Voices From the Cape, historical work co-authored with NASA historian Roger Launius, the completion of a series of oral histories with key KSC personnel, expansion of monograph on Public Affairs into two comprehensive pieces on KSC press operations and KSC visitor operations, the expansion of KSC Historical Concept Maps (Cmap) for history knowledge preservation, the expansion of the KSC oral history program through the administration of an oral history workshop for KSC-based practitioners, and the continued collaborative relationships between Kennedy Space Center, the University of West Florida, the University of Central Florida and other institutions including the University of Louisiana at Lafayette.

  19. Moisture Metrics Project

    SciTech Connect

    Schuchmann, Mark

    2011-08-31

    the goal of this project was to determine the optimum moisture levels for biomass processing for pellets commercially, by correlating data taken from numerous points in the process, and across several different feedstock materials produced and harvested using a variety of different management practices. This was to be done by correlating energy consumption and material through put rates with the moisture content of incoming biomass ( corn & wheat stubble, native grasses, weeds, & grass straws), and the quality of the final pellet product.This project disseminated the data through a public website, and answering questions form universities across Missouri that are engaged in biomass conversion technologies. Student interns from a local university were employed to help collect data, which enabled them to learn firsthand about biomass processing.

  20. The Viking project. [summary

    NASA Technical Reports Server (NTRS)

    Soffen, G. A.

    1977-01-01

    The Viking project launched two unmanned spacecraft to Mars in 1975 for scientific exploration with special emphasis on the search for life. Each spacecraft consisted of an orbiter and a lander. The landing sites were finally selected after the spacecraft were in orbit. Thirteen investigations were performed: three mapping experiments from the orbiter, one atmospheric investigation during the lander entry phase, eight experiments on the surface of the planet, and one using the spacecraft radio and radar systems. The experiments on the surface dealt principally with biology, chemistry, geology, and meteorology. Seventy-eight scientists have participated in the 13 teams performing these experiments. This paper is a summary of the project and an introduction to the articles that follow.

  1. GOATS Image Projection Component

    NASA Technical Reports Server (NTRS)

    Haber, Benjamin M.; Green, Joseph J.

    2011-01-01

    When doing mission analysis and design of an imaging system in orbit around the Earth, answering the fundamental question of imaging performance requires an understanding of the image products that will be produced by the imaging system. GOATS software represents a series of MATLAB functions to provide for geometric image projections. Unique features of the software include function modularity, a standard MATLAB interface, easy-to-understand first-principles-based analysis, and the ability to perform geometric image projections of framing type imaging systems. The software modules are created for maximum analysis utility, and can all be used independently for many varied analysis tasks, or used in conjunction with other orbit analysis tools.

  2. Project ASTRO-Tucson

    NASA Astrophysics Data System (ADS)

    Walker, C. E.; Jacoby, S. H.

    2001-12-01

    Imagine melding together the best ingredients available to inspire and excite children about astronomy. Project ASTRO-Tucson has succeeded in perfecting one such recipe: equal parts of art, writing, inquiry, and astronomy blended with inspiring speakers and set against the magnificent backdrop of Kitt Peak National Observatory. Led by the National Optical Astronomy Observatory (NOAO) Educational Outreach Department and funded by NSF, Project ASTRO-Tucson has presented six annual workshops and reached over 13,000 students by forming ongoing partnerships between astronomers and educators. We present results from the 2001 workshop, including efforts to make the integrated workshop palatable to astronomers and teachers, and describe plans to make some components of the successful face to face workshop web-accessible, and therefore available to a larger audience.

  3. The Orphan Lenses Project

    NASA Astrophysics Data System (ADS)

    Moustakas, Leonidas A.; Brownstein, J.; Fadely, R.; Fassnacht, C. D.; Gavazzi, R.; Goodsall, T.; Griffith, R. L.; Keeton, C. R.; Kneib, J. P.; Koekemoer, A.; Koopmans, L. V. E.; Marshall, P. J.; Merten, J.; Metcalf, R. B.; Oguri, M.; Papovich, C.; Rein, H.; Ryan, R.; Stewart, K. R.; Treu, T.

    2012-01-01

    Strong gravitational lenses are uniquely suited for the study of dark matter structure and substructure within massive halos of many scales, act as gravitational telescopes for distant faint objects, and can give powerful and competitive cosmological constraints. Some 300 lenses have been identified in the literature in one form or another; many others have been found, but perhaps have not warranted dedicated publications. The Orphan Lenses project aims to be a master compilation of all strong gravitational lenses that are known, and a community repository for candidate lenses. A clear and uniform database of basic properties and gravitational lens models is being developed, which will be available online and through a smartphone interactive application. I will present the project, and scientific highlights with this dataset.

  4. The EUROTRANS Project

    SciTech Connect

    Podlech, H.; Busch, M.; Dziuba, F.; Klein, H.; Ratzinger, U.; Tiede, R.; Zhang, C.; Barbanotti, S.; Panzeri, N.; Pierini, P.; Bechtold, A.; Biarrotte, J.-L.; Junquera, T.; Mueller, A. C.; Olry, G.; Bousson, S.; Gobin, R.; Luong, M.

    2010-08-04

    Accelerator Driven Systems (ADS) for nuclear waste transmutation require proton drivers with energies between 600 and 800 MeV and beam currents of several mA for demonstrators and up to 25 mA for large industrial systems. Within the EUROTRANS project a 600 MeV linac has been designed to meet the stringent requirements regarding reliability, availability and extreme low beam losses. The first accelerating section using the novel CH-cavity accelerates the beam to 17 MeV at the injection point into the main linac. The intermediate energy section (17-100 MeV) of the main linac consists of superconducting independently phased spoke-type cavities followed by the high energy section consisting of 704 MHz superconducting elliptical cavities. The paper covers the development of the linac, prototype testing and reliability considerations of the whole EUROTRANS project.

  5. Nucla CFB Demonstration Project

    SciTech Connect

    Not Available

    1990-12-01

    This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

  6. The Apollo Lightcraft Project

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The overall goal for this NASA/USRA-sponsored 'Apollo Lightcraft Project' is to develop a revolutionary launch vehicle technology that can reduce payload transport costs by a factor of 1000 below the Space Shuttle Orbiter. The RPI design team proposes to utilize advanced, highly energetic, beamed-energy sources (laser, microwave) and innovative combined-cycle (airbreathing/rocket) engines to accomplish this goal. This second year focused on systems integration and analysis of the 'Apollo Lightcraft'. This beam-powered, single-stage-to-orbit vehicle is envisioned as the globe-trotting family shuttlecraft of the 21st century. Detailed investigations of the Apollo Lightcraft Project during the second year of study helped evolve the propulsion system design, while focusing on the following areas: (1) man/machine interface; (2) flight control systems; (3) power beaming system architecture; (4) reentry aerodynamics; (5) shroud structural dynamics; and (6) optimal trajectory analysis.

  7. ISIS and META projects

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth; Cooper, Robert; Marzullo, Keith

    1990-01-01

    The ISIS project has developed a new methodology, virtual synchony, for writing robust distributed software. High performance multicast, large scale applications, and wide area networks are the focus of interest. Several interesting applications that exploit the strengths of ISIS, including an NFS-compatible replicated file system, are being developed. The META project is distributed control in a soft real-time environment incorporating feedback. This domain encompasses examples as diverse as monitoring inventory and consumption on a factory floor, and performing load-balancing on a distributed computing system. One of the first uses of META is for distributed application management: the tasks of configuring a distributed program, dynamically adapting to failures, and monitoring its performance. Recent progress and current plans are reported.

  8. Final Project Report

    SciTech Connect

    Small, R. Justin; Bryan, Frank; Tribbia, Joseph; Park, Sungsu; Dennis, John; Saravanan, R.; Schneider, Niklas; Kwon, Young-Oh

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  9. Geothermal Project. Final report

    SciTech Connect

    Not Available

    1983-03-31

    The project was designed to take 95/sup 0/F water from an existing well and process it through a heat exchanger carrying supply water for our boiler make up and domestic hot water systems. The temperature of this water runs from 55/sup 0/F to 65/sup 0/F. In operation it was possible to raise the temperature of this water an average of approximately 12/sup 0/F. The amount of energy captured was recorded and it was found that one can capture approximately 199 x 10/sup 6/ Btu/Mo. Using current energy costs and a boiler efficiency factor of .8 a potential annual savings of approximately $11,104/year was calculated. The total cost of the project was $31,893.68. Using these figures a simple pay back period of 2.9 years was calculated.

  10. Project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Gawdiak, Yuri O. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  11. The ESTER project

    NASA Astrophysics Data System (ADS)

    Rieutord, M.; Dintrans, B.; Lignières, F.; Corbard, T.; Pichon, B.

    2005-12-01

    The ESTER project aims at building a stellar evolution code in two dimensions of space for the study of effects of rotation. The numerical scheme is based on spectral methods with a spherical harmonic decomposition in the horizontal direction and a Chebyshev polynomial expansion in the vertical direction. Coordinates adapted to the centrifugally distorted shape are mapped to spherical coordinates. First tests on rotating polytropes are presented.

  12. Project Proposals Evaluation

    NASA Astrophysics Data System (ADS)

    Encheva, Sylvia; Tumin, Sharil

    2009-08-01

    Collaboration among various firms has been traditionally used trough single project joint ventures for bonding purposes. Eventhough the performed work is usually beneficial to some extend to all participants, the type of collaboration option to be adapted is strongly influenced by overall purposes and goals that can be achieved. In order to facilitate a choice of collaboration option best suited to a firm's need a computer based model is proposed.

  13. TEDESE project: preliminary results

    NASA Astrophysics Data System (ADS)

    Buforn, E.; Martín Dávila, J.; Bock, G.; Pazos, A.; Udías, A.; Hanka, H.; Gárate, J.; Perez Peña, A.

    2003-04-01

    The TEDESE (Terremotos y Deformación Cortical en el Sur de España) project is a joint project of the Universidad Complutense de Madrid (UCM) and Real Instituto y Observatorio de la Armada de San Fernando, Cádiz (ROA) supported by the Spanish Ministerio de Ciencia y Tecnología with the participation of the GeoforschungZentrum, Potsdam (GFZ). The project started on January 2001 and it will extend till December 2003. As part of this project a temporal network of 10 broad-band seismological stations, which will complete those already existing in the zone, have been installed for a period of 20 months (October 01-June 03) in southern Spain and northern Africa. This temporary net has recorded, till November 2002, more than 760 regional earthquakes, with magnitudes between 1.7 and 5.1. We have studied in detail two shallow events occurred in Gergal (Almería, SE Spain, 04-02- 02, M=5.0) and Bullas (Murcia, SE Span, 06-08-02, M=4.8), its aftershocks series and two intermediate depth (h=90km) earthquakes located in Málaga (Spain, M=4.5). GPS time series, from permanent GPS stations deployed at the region by ROA and other institutions, have been produced and velocity vectors have been derived. GPS data coming from previous periodic field campaigns carried out in the region by ROA since 1996 are being reprocessed, and a new GPS campaing is planned for June 2003.

  14. Baltimore applications project

    NASA Technical Reports Server (NTRS)

    Golden, T. S.; Yaffee, P.

    1978-01-01

    The Baltimore Applications Project (BAP) was originally designed as an experimental effort to assist the government of the City of Baltimore in applying technology to the solution of municipal problems. Recent modifications in the structuring and operation of the program are discussed. A tabular update on the individual tasks undertaken and their treatment is provided. Details of energy and nonenergy related tasks are presented in appendices.

  15. Project Ares 3

    NASA Technical Reports Server (NTRS)

    Raymer, Dan; Russell, Phyllis; Fox, Tim; Meyers, Doug; Lovric, Steven; Grabow, Robert; Epp, Manfred; Wynn, Warren, Jr.; Mako, Zoltan; Linzner, Gunther

    1992-01-01

    The mission of Project Ares is to design and fabricate an Earth prototype, autonomous flying rover capable of flying on the Martian surface. The project was awarded to California State University, Northridge (CSUN) in 1989 where an in-depth paper study was completed. The second year's group, Project Ares 2, designed and fabricated a full-scale flight demonstration aircraft. Project Ares 3, the third and final group, is responsible for propulsion system design and installation, controls and instrumentation, and high altitude testing. The propulsion system consists of a motor and its power supply, geartrain, and propeller. The motor is a four-brush DC motor powered by a 50-V NiCd battery supply. A pulley and belt arrangement is used for the geartrain and includes light weight, low temperature materials. The propeller is constructed from composite materials which ensures high strength and light weight, and is specifically developed to provide thrust at extremely high altitudes. The aircraft is controlled with a ground-based radio control system and an autopilot which will activate in the event that the control signal is lost. A transponder is used to maintain radar contact for ground tracking purposes. The aircraft possesses a small, onboard computer for collecting and storing flight data. To safeguard the possibility of computer failure, all flight data is transmitted to a ground station via a telemetry system. An initial, unpowered, low-level test flight was completed in August of 1991. Testing of systems integration in the second low-level test flight resulted in loss of elevator control which caused considerable damage on landing. Complete failure analysis and repairs are scheduled for September of 1992.

  16. HOTPC PMC Project Overview

    NASA Technical Reports Server (NTRS)

    Sutter, Jim; Gray, Hugh R. (Technical Monitor)

    2002-01-01

    A review of NASA GRCs Higher Operating Temperature Propulsion Components Project (HOTPC) on polymer matrix composites (PMCs) will be described. The summary includes research from NASA GRC in-house, university and industry's cooperative programs. Current research emphasis focuses on developing high temperature PMCs used in rapidly heated structures, erosion coatings for PMCs, nano-materials compatible with polyimide resins, and development of more durable high temperature PMCs.

  17. HAD Oral History Project

    NASA Astrophysics Data System (ADS)

    Holbrook, Jarita

    2014-01-01

    The Historical Astronomy Division is the recipient of an American Institute of Physics Neils Bohr Library Grant for Oral History. HAD has assembled a team of volunteers to conduct oral history interviews since May 2013. Each oral history interview varies in length between two and six hours. This presentation is an introduction to the HAD Oral History Project and the activities of the team during the first six months of the grant.

  18. Bloch vector projection noise

    NASA Technical Reports Server (NTRS)

    Wang, Li-Jun; Bacon, A. M.; Zhao, H.-Z.; Thomas, J. E.

    1994-01-01

    In the optical measurement of the Bloch vector components describing a system of N two-level atoms, the quantum fluctuations in these components are coupled into the measuring optical field. This paper develops the quantum theory of optical measurement of Bloch vector projection noise. The preparation and probing of coherence in an effective two-level system consisting of the two ground states in an atomic three-level lambda-scheme are analyzed.

  19. Project DEEP STEAM

    NASA Astrophysics Data System (ADS)

    Marshall, B. W.

    Development of technology for thermally efficient downhole delivery of surface generated steam and for downhole steam generators are the major elements of Project DEEP STEAM. Specific activities include development of advanced concept thermal packers, evaluation of the thermal performance of insulated tubing designs in a test tower and in a field environment, and development of downhole steam generator concepts. Field tests were performed in both technology areas and the results and status are presented.

  20. Project DEEP STEAM

    SciTech Connect

    Marshall, B.W.

    1982-01-01

    Development of technology for thermally efficient downhole delivery of surface-generated steam and for downhole steam generators are the major elements of Project DEEP STEAM. Specific activities include development of advanced concept thermal packers, evaluation of the thermal performance of insulated tubing designs in a test tower and in a field environment, and development of downhole steam generator concepts. Field tests have been performed in both technology areas and the results and status are presented.

  1. Swamp Works- Multiple Projects

    NASA Technical Reports Server (NTRS)

    Carelli, Jonathan M.

    2013-01-01

    My Surface Systems internship over the summer 2013 session covered a broad range of projects that ranged multiple aspects and fields of engineering and technology. This internship included a project to create a command center for a 120 ton regolith bin, a design and build for a blast shield to add further protection for the Surface Systems engineers, a design for a portable four monitor hyper wall that can extend as large as needed, research and programming a nano drill for a next generation robot, and social media tasks including the making of videos, posting to social networking websites and implementation of a new weekly outreach program to help spread the word about the Swamp Works laboratory. The objectives for the command center were to create a central computer controlled area for the still in production lunar regolith bin. It needed to be easy to use and the operating systems had to be Linux. The objectives for the hyper wall were to build a mobile transport of monitors that could potentially attach to one another. It needed to be light but sturdy, and have the ability to last. The objectives for the blast shield included a robust design that could withstand a small equipment malfunction, while also being convenient for use. The objectives for the nano-drill included the research and implementation of programming for vertical and horizontal movement. The hyper wall and blasts shield project were designed by me in the Pro/Engineer/Creo2 software. Each project required a meeting with the Swamp Works engineers and was declared successful.

  2. SIRIUS FEL project

    NASA Astrophysics Data System (ADS)

    Roche, Michel; Moret-Bailly, Jacques

    1991-07-01

    This article presents a 6 MV electrostatic accelerator-driven free electron laser project, with a wavelength range of 80 to 1000 μm. The study of this facility, called SIRIUS (source intense de rayonnement infra-rouge pour utilisations scientifiques), is based on the facility realized by Elias at the University of California, Santa Barbara. We plan to improve some important technological features.

  3. Robotics research projects report

    SciTech Connect

    Hsia, T.C.

    1983-06-01

    The research results of the Robotics Research Laboratory are summarized. Areas of research include robotic control, a stand-alone vision system for industrial robots, and sensors other than vision that would be useful for image ranging, including ultrasonic and infra-red devices. One particular project involves RHINO, a 6-axis robotic arm that can be manipulated by serial transmission of ASCII command strings to its interfaced controller. (LEW)

  4. Geospace Exploration: ERG project

    NASA Astrophysics Data System (ADS)

    Miyoshi, Yoshizumi; Kasaba, Yasumasa; Shiokawa, Kazuo; Hirahara, Masafumi; Nagatsuma, Tsutomu; Takashima, Takeshi; Seki, Kanako; Kumamoto, Atsushi; Asamura, Kazushi; Kojima, Hirotsugu; Ono, DTakayuki; Matsuoka, Ayako; Fujimoto, Masaki

    2012-07-01

    The ERG (Energization and Radiation in Geospace) is a geospace exploration mission in Japan for the solar maximum and subsequent declining phase of solar cycle 24. The mission is especially focusing on the relativistic electron acceleration mechanism in the context of the cross-energy coupling via wave-particle interactions as well as the dynamics of space storms. The interplay among different plasma/particle populations of the inner magnetosphere; plasmasphere, ring current/plasma sheet, and radiation belts is a key to understand the energetic particle accelerations. The cross-regional coupling such as magnetosphere-ionosphere via FAC and the potential electric fields causes the spontaneous variations of the ambient fields. The ERG project consists of the satellite observation team, the ground-based observation team, and integrated-data analysis/simulation team, as well as the science working team and the project science team. The SPRINT-B/ERG satellite of ISAS/JAXA will be launched into inner magnetosphere in FY2014-2015. The comprehensive instruments for plasma/particles, field and waves are installed in the SPRING-B/ERG satellite to elucidate the electron acceleration processes. The newly developed system will directly measure the flow of the Poynting flux between particles and waves in the wave-particle interactions. The Japanese ground-network teams including magnetometer, SuperDARN radar, optical imager, VLF, etc. join the ERG project, which are very powerful tool for geospace remote sensing. The integrated data analysis and simulation team is now developing the simulation tools which can be compared directly with the observations. In this talk, we will present the current status of the ERG project and possible collaborations with other geospace satellite missions such as THEMIS, RBSP and RESONANCE etc. as well as the ground-based observations and simulation studies.

  5. Renewable energy project development

    SciTech Connect

    Ohi, J.

    1996-12-31

    The author presents this paper with three main thrusts. The first is to discuss the implementation of renewable energy options in China, the second is to identify the key project development steps necessary to implement such programs, and finally is to develop recommendations in the form of key issues which must be addressed in developing such a program, and key technical assistance needs which must be addressed to make such a program practical.

  6. Viking 75 Project.

    NASA Technical Reports Server (NTRS)

    Martin, J. S., Jr.; Sibbers, C. W.

    1972-01-01

    Description of the Viking Project, a current effort to explore Mars using two unmanned spacecraft, consisting of an orbiter and lander each, during the 1975-1976 opportunity. The experiments on the surface will deal principally with biology, geology, and meteorology. If life is discovered on Mars, the dramatic find would greatly expand the field of exobiology and lead to a remarkable opportunity to study life that may be similar or different from our own.

  7. The plagiarism project.

    PubMed

    Glassman, Nancy R; Sorensen, Karen; Habousha, Racheline G; Minuti, Aurelia; Schwartz, Rachel

    2011-01-01

    Plagiarism has been a problem plaguing academia for centuries. The Internet has made it easier than ever to copy material from one electronic document and paste it into another. Many cases are unintentional, as writers are unaware of the rules regarding plagiarism. This paper provides an overview of plagiarism and describes a project in which librarians partnered with the assistant dean of a graduate science program to educate students about the perils of plagiarism and encourage ethical writing practices. PMID:22040240

  8. Stumping for the Project

    NASA Technical Reports Server (NTRS)

    Ginty, Carol

    2003-01-01

    Advocating research is a little trickier than selling other projects at NASA. You can point to a satellite. You can point to a rocket you can see the Shuttle and the International Space Station . But it's different on the research side . How do you display Computational Fluid Dynamics? How do you get someone to understand the value of composite materials or Nano-tubes that they can't even see without a microscope?

  9. The ribosomal database project.

    PubMed Central

    Larsen, N; Olsen, G J; Maidak, B L; McCaughey, M J; Overbeek, R; Macke, T J; Marsh, T L; Woese, C R

    1993-01-01

    The Ribosomal Database Project (RDP) is a curated database that offers ribosome data along with related programs and services. The offerings include phylogenetically ordered alignments of ribosomal RNA (rRNA) sequences, derived phylogenetic trees, rRNA secondary structure diagrams and various software packages for handling, analyzing and displaying alignments and trees. The data are available via ftp and electronic mail. Certain analytic services are also provided by the electronic mail server. PMID:8332524

  10. The ABINIT software project

    NASA Astrophysics Data System (ADS)

    Rignanese, Gian-Marco

    The ABINIT software project aims at providing the total energy, charge density and electronic structure of systems made of electrons and nuclei (molecules and periodic solids) thanks to a``first-principle'' approach. The ground state properties are calculated in the framework of the Density-Functional Theory (DFT). The excited states properties are computed within the Many-Body Perturbation Theory (MBPT). Finally, the response properties are obtained from Density-Functional Perturbation Theory (DFPT). The ABINIT software project was started in 1997 as an open software project, without a ``definite'' goal, developed using several software engineering techniques to allow international collaboration of many different groups. The first publicly available version of ABINIT was released in December 2000 under the GNU GPL. The software has already been described in various articles [1-4]. The last stable version of the package (7.10.4) has now a 70 MBytes size, consisting in nearly 1400 files written in F90 (830000 lines) and including documentation, tutorials and more than one thousand tests. The code is developed by an always opened community (around fifty people) and it is used by more than a thousand individuals worldwide.

  11. Cohort Profile: Project Viva

    PubMed Central

    Oken, Emily; Baccarelli, Andrea A; Gold, Diane R; Kleinman, Ken P; Litonjua, Augusto A; De Meo, Dawn; Rich-Edwards, Janet W; Rifas-Shiman, Sheryl L; Sagiv, Sharon; Taveras, Elsie M; Weiss, Scott T; Belfort, Mandy B; Burris, Heather H; Camargo, Carlos A; Huh, Susanna Y; Mantzoros, Christos; Parker, Margaret G; Gillman, Matthew W

    2015-01-01

    We established Project Viva to examine prenatal diet and other factors in relation to maternal and child health. We recruited pregnant women at their initial prenatal visit in eastern Massachusetts between 1999 and 2002. Exclusion criteria included multiple gestation, inability to answer questions in English, gestational age ≥22 weeks at recruitment and plans to move away before delivery. We completed in-person visits with mothers during pregnancy in the late first (median 9.9 weeks of gestation) and second (median 27.9 weeks) trimesters. We saw mothers and children in the hospital during the delivery admission and during infancy (median age 6.3 months), early childhood (median 3.2 years) and mid-childhood (median 7.7 years). We collected information from mothers via interviews and questionnaires, performed anthropometric and neurodevelopmental assessments and collected biosamples. We have collected additional information from medical records and from mailed questionnaires sent annually to mothers between in-person visits and to children beginning at age 9 years. From 2341 eligible women, there were 2128 live births; 1279 mother-child pairs provided data at the mid-childhood visit. Primary study outcomes include pregnancy outcomes, maternal mental and cardiometabolic health and child neurodevelopment, asthma/atopy and obesity/cardiometabolic health. Investigators interested in learning more about how to obtain Project Viva data can contact Project_Viva@hphc.org. PMID:24639442

  12. Final Project Report

    SciTech Connect

    Bogucz, E A

    2010-12-13

    This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for “intelligent nested environmental systems technologies (iNEST),” which monitor and control energy flows and IEQ across a cascade of spaces from individuals’ desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoE’s Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuse’s Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoE’s website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

  13. Milliwatt Generator Project

    SciTech Connect

    Latimer, T.W.; Rinehart, G.H.

    1992-05-01

    This report covers progress on the Milliwatt Generator Project from April 1986 through March 1988. Activities included fuel processing and characterization, production of heat sources, fabrication of pressure-burst test units, compatibility studies, impact testing, and examination of surveillance units. The major task of the Los Alamos Milliwatt Generator Project is to fabricate MC2893A heat sources (4.0 W) for MC2730A radioisotope thermoelectric generators (RTGS) and MC3599 heat sources (4.5 W) for MC3500 RTGs. The MWG Project interfaces with the following contractors: Sandia National Laboratories, Albuquerque (designer); E.I. du Pont de Nemours and Co. (Inc.), Savannah River Plant (fuel); Monsanto Research Corporation, Mound Facility (metal hardware); and General Electric Company, Neutron Devices Department (RTGs). In addition to MWG fabrication activities, Los Alamos is involved in (1) fabrication of pressure-burst test units, (2) compatibility testing and evaluation, (3) examination of surveillance units, and (4) impact testing and subsequent examination of compatibility and surveillance units.

  14. Final project report

    SciTech Connect

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  15. Astronomy Science Fair Projects

    NASA Astrophysics Data System (ADS)

    Pittichová, J.; Kadooka, M.-A.; Meech, K. J.

    2004-12-01

    ``Extrasolar Planet Transit", ``Lightcurve of a Variable Star", and ``Retrograde Motion of Mars" are some of the titles of high school students' projects entered in the Hawaii State Science Fair. TOPS (Toward Other Planetary Systems) teachers who participated in the University of Hawaii Institute for Astronomy summer outreach program under the direction of professor Karen J. Meech mentored their students. After attending the 3-week National Science Foundation Institute for several summers since 1999, these teachers in the summer of 2003 were trained to do observing plans to obtain images from telescopes, use image processing software MIRA for photometry, and produce light curves of variable stars and extrasolar planet transits. Others used the software ``Astrometrica" to do astrometry of Kuiper Belt Objects. Using Compaq laptop computers on long term loan, our teachers mentored students for astronomy projects during the 2003-2004 school year. These students made observing plans for images from the 31inch Lowell Telescope in Arizona and/or from the 2.2m University of Hawaii Telescope at Mauna Kea Observatory. Learning about filters, exposure time, magnitude, frequency of taking CCD images, and ephemeris required many iterations between students, teachers, and astronomers and graduate students who were assisting. Poor weather conditions and other frustrations exposed the students to the realities of research. However, they were rewarded with projects that impressed the judges and that will be described.

  16. Milliwatt Generator Project

    NASA Astrophysics Data System (ADS)

    Latimer, T. W.; Rinehart, G. H.

    1992-05-01

    This report covers progress on the Milliwatt Generator Project from April 1986 through March 1988. Activities included fuel processing and characterization, production of heat sources, fabrication of pressure-burst test units, compatibility studies, impact testing, and examination of surveillance units. The major task of the Los Alamos Milliwatt Generator Project is to fabricate MC2893A heat sources (4.0 W) for MC2730A radioisotope thermoelectric generators (RTG's) and MC3599 heat sources (4.5 W) for MC3500 RTG's. The MWG Project interfaces with the following contractors: Sandia National Laboratories, Albuquerque (designer); E.I. du Pont de Nemours and Co. (Inc.), Savannah River Plant (fuel); Monsanto Research Corporation, Mound Facility (metal hardware); and General Electric Company, Neutron Devices Department (RTG's). In addition to MWG fabrication activities, Los Alamos is involved in (1) fabrication of pressure-burst test units, (2) compatibility testing and evaluation, (3) examination of surveillance units, and (4) impact testing and subsequent examination of compatibility and surveillance units.

  17. Cohort profile: project viva.

    PubMed

    Oken, Emily; Baccarelli, Andrea A; Gold, Diane R; Kleinman, Ken P; Litonjua, Augusto A; De Meo, Dawn; Rich-Edwards, Janet W; Rifas-Shiman, Sheryl L; Sagiv, Sharon; Taveras, Elsie M; Weiss, Scott T; Belfort, Mandy B; Burris, Heather H; Camargo, Carlos A; Huh, Susanna Y; Mantzoros, Christos; Parker, Margaret G; Gillman, Matthew W

    2015-02-01

    We established Project Viva to examine prenatal diet and other factors in relation to maternal and child health. We recruited pregnant women at their initial prenatal visit in eastern Massachusetts between 1999 and 2002. Exclusion criteria included multiple gestation, inability to answer questions in English, gestational age ≥22 weeks at recruitment and plans to move away before delivery. We completed in-person visits with mothers during pregnancy in the late first (median 9.9 weeks of gestation) and second (median 27.9 weeks) trimesters. We saw mothers and children in the hospital during the delivery admission and during infancy (median age 6.3 months), early childhood (median 3.2 years) and mid-childhood (median 7.7 years). We collected information from mothers via interviews and questionnaires, performed anthropometric and neurodevelopmental assessments and collected biosamples. We have collected additional information from medical records and from mailed questionnaires sent annually to mothers between in-person visits and to children beginning at age 9 years. From 2341 eligible women, there were 2128 live births; 1279 mother-child pairs provided data at the mid-childhood visit. Primary study outcomes include pregnancy outcomes, maternal mental and cardiometabolic health and child neurodevelopment, asthma/atopy and obesity/cardiometabolic health. Investigators interested in learning more about how to obtain Project Viva data can contact Project_Viva@hphc.org. PMID:24639442

  18. The Manhattan Project

    NASA Astrophysics Data System (ADS)

    Reed, B. Cameron

    2014-10-01

    The Manhattan Project was the United States Army’s program to develop and deploy nuclear weapons during World War II. In these devices, which are known popularly as ‘atomic bombs’, energy is released not by a chemical explosion but by the much more violent process of fission of nuclei of heavy elements via a neutron-mediated chain-reaction. Three years after taking on this project in mid-1942, the Army’s Manhattan Engineer District produced three nuclear bombs of two different designs. Two of these devices were fueled with the 239 isotope of the synthetic element plutonium, while the third employed the rare 235 isotope of uranium. One of the plutonium devices, code-named Trinity, was detonated in a test in southern New Mexico on 16 July 1945; this was the world’s first nuclear explosion. Three weeks later, on 6 August, the uranium bomb, Little Boy, was dropped on the Japanese city of Hiroshima. On 9 August the second plutonium device, Fat Man, was dropped on Nagasaki. Together, the two bombings killed over 100 000 people and were at least partially responsible for the Japanese government’s 14 August decision to surrender. This article surveys, at an undergraduate level, the science and history of the Manhattan Project.

  19. AAS Oral History Project

    NASA Astrophysics Data System (ADS)

    Buxner, Sanlyn; Holbrook, Jarita; AAS Oral History Team

    2016-06-01

    Now in its fourth year, the AAS Oral History Project has interviewed over 80 astronomers from all over the world. Led by the AAS Historical Astronomy Division (HAD) and partially funded by the American Institute of Physics Niels Bohr Library and ongoing support from the AAS, volunteers have collected oral histories from astronomers at professional meetings starting in 2015, including AAS, DPS, and the IAU general assembly. Each interview lasts one and a half to two hours and focuses on interviewees’ personal and professional lives. Questions include those about one’s family, childhood, strong influences on one’s scientific career, career path, successes and challenges, perspectives on how astronomy is changing as a field, and advice to the next generation. Each interview is audio recorded and transcribed, the content of which is checked with each interviewee. Once complete, interview transcripts are posted online as part of a larger oral history library at https://www.aip.org/history-programs/niels-bohr-library/oral-histories. Future analysis will reveal a rich story of astronomers and will help the community address issues of diversity, controversies, and the changing landscape of science. We are still recruiting individuals to be interviewed from all stages of career from undergraduate students to retired and emeritus astronomers. Contact Jarita Holbrook to schedule an interview or to find out more information about the project (astroholbrook@gmail.com). Also, contact Jarita Holbrook if you would like to become an interviewer for the project.

  20. Project Management Plan

    SciTech Connect

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  1. Biorefinery projects in China

    SciTech Connect

    Yinging, R.M.; Lambert, R.O.; Barrier, J.W.; Broder, J.D.

    1996-12-31

    YSC Holdings (YSC) is working on a three joint venture project in the Peoples Republic of China to convert cellulosic feedstock such as corn stover to fuels, chemicals and electricity. The Tennessee Valley Authority (TVA) is providing technology and technical assistance for these project to YSC under a contractual agreement. TVA has developed a biorefinery process which uses dilute sulfuric acid hydrolysis technology to convert cellulosic feedstocks to sugars which can then be used to produce chemicals. Lignin, the solid residue of the process can be used as a combustion fuel for production of steam and electricity. The process will accept a variety of feedstocks which include agricultural residues, such as corn stover, sugar cane baggas, wheat straw, wood waste, short rotation woody crops, grass crops, and the cellulosic portion of municipal solid waste (MSW). The primary products of the biorefinery process are ethanol, furfural, and clean burning lignin as a solid boiler fuel. Electricity can also be produced if the price paid for electricity provides a better return on an investment than direct sale of lignin as a boiler fuel. By-products are carbon dioxide, gypsum, and biogas (60% methane). The three plants will each process 1,800 metric ton/day of corn stover. The first plant, in Weifang, China has central government approval. The second and third plants, in Benxi and Jinzhou, China are awaiting local approval. The projected economics for these commercial facilities will be presented.

  2. Nationwide Eclipse Ballooning Project

    NASA Astrophysics Data System (ADS)

    Colman Des Jardins, Angela; Berk Knighton, W.; Larimer, Randal; Mayer-Gawlik, Shane; Fowler, Jennifer; Harmon, Christina; Koehler, Christopher; Guzik, Gregory; Flaten, James; Nolby, Caitlin; Granger, Douglas; Stewart, Michael

    2016-05-01

    The purpose of the Nationwide Eclipse Ballooning Project is to make the most of the 2017 rare eclipse event in four main areas: public engagement, workforce development, partnership development, and science. The Project is focused on two efforts, both student-led: online live video of the eclipse from the edge of space and the study of the atmospheric response to the eclipse. These efforts, however, involving more than 60 teams across the US, are challenging in many ways. Therefore, the Project is leveraging the NASA Space Grant and NOAA atmospheric science communities to make it a success. The first and primary topic of this poster is the NASA Space Grant supported online live video effort. College and high school students on 48 teams from 31 states will conduct high altitude balloon flights from 15-20 locations across the 8/21/2017 total eclipse path, sending live video and images from near space to a national website. Video and images of a total solar eclipse from near space are fascinating and rare. It’s never been done live and certainly not in a network of coverage across a continent. In addition to the live video to the web, these teams are engaged in several other science experiments as secondary payloads. We also briefly highlight the eclipse atmospheric science effort, where about a dozen teams will launch over one hundred radiosondes from across the 2017 path, recording an unprecedented atmospheric data sample. Collected data will include temperature, density, wind, humidity, and ozone measurements.

  3. Commuting projections on graphs

    SciTech Connect

    Vassilevski, Panayot S.; Zikatanov, Ludmil T.

    2013-02-19

    For a given (connected) graph, we consider vector spaces of (discrete) functions defined on its vertices and its edges. These two spaces are related by a discrete gradient operator, Grad and its adjoint, ₋Div, referred to as (negative) discrete divergence. We also consider a coarse graph obtained by aggregation of vertices of the original one. Then a coarse vertex space is identified with the subspace of piecewise constant functions over the aggregates. We consider the ℓ2-projection QH onto the space of these piecewise constants. In the present paper, our main result is the construction of a projection π H from the original edge-space onto a properly constructed coarse edge-space associated with the edges of the coarse graph. The projections π H and QH commute with the discrete divergence operator, i.e., we have div π H = QH div. The respective pair of coarse edge-space and coarse vertexspace offer the potential to construct two-level, and by recursion, multilevel methods for the mixed formulation of the graph Laplacian which utilizes the discrete divergence operator. The performance of one two-level method with overlapping Schwarz smoothing and correction based on the constructed coarse spaces for solving such mixed graph Laplacian systems is illustrated on a number of graph examples.

  4. OCGen Module Mooring Project

    SciTech Connect

    McEntee, Jarlath

    2015-02-06

    Ocean Renewable Power Company's OCGen Module Mooring Project provided an extensive research, design, development, testing and data collection effort and analysis conducted with respect to a positively buoyant, submerged MHK device secured to the seabed using a tensioned mooring system. Different analytic tools were evaluated for their utility in the design of submerged systems and their moorings. Deployment and testing of a prototype OCGen® system provided significant data related to mooring line loads and system attitude and station keeping. Mooring line loads were measured in situ and reported against flow speeds. The Project made a significant step in the development of designs, methodologies and practices related to floating and mooring of marine hydrokinetic (MHK) devices. Importantly for Ocean Renewable Power Company, the Project provided a sound basis for advancing a technically and commercially viable OCGen® Power System. The OCGen® Power System is unique in the MHK industry and, in itself, offers distinct advantages of MHK devices that are secured to the seabed using fixed structural frames. Foremost among these advantages are capital and operating cost reductions and increased power extraction by allowing the device to be placed at the most energetic level of the water column.

  5. Tidd PFBC demonstration project

    SciTech Connect

    Marrocco, M.

    1997-12-31

    The Tidd project was one of the first joint government-industry ventures to be approved by the US Department of Energy (DOE) in its Clean Coal Technology Program. In March 1987, DOE signed an agreement with the Ohio Power Company, a subsidiary of American Electric Power, to refurbish the then-idle Tidd plant on the banks of the Ohio River with advanced pressurized fluidized bed technology. Testing ended after 49 months of operation, 100 individual tests, and the generation of more than 500,000 megawatt-hours of electricity. The demonstration plant has met its objectives. The project showed that more than 95 percent of sulfur dioxide pollutants could be removed inside the advanced boiler using the advanced combustion technology, giving future power plants an attractive alternative to expensive, add-on scrubber technology. In addition to its sulfur removal effectiveness, the plant`s sustained periods of steady-state operation boosted its availability significantly above design projections, heightening confidence that pressurized fluidized bed technology will be a reliable, baseload technology for future power plants. The technology also controlled the release of nitrogen oxides to levels well below the allowable limits set by federal air quality standards. It also produced a dry waste product that is much easier to handle than wastes from conventional power plants and will likely have commercial value when produced by future power plants.

  6. NREL Smart Grid Projects

    SciTech Connect

    Hambrick, J.

    2012-01-01

    Although implementing Smart Grid projects at the distribution level provides many advantages and opportunities for advanced operation and control, a number of significant challenges must be overcome to maintain the high level of safety and reliability that the modern grid must provide. For example, while distributed generation (DG) promises to provide opportunities to increase reliability and efficiency and may provide grid support services such as volt/var control, the presence of DG can impact distribution operation and protection schemes. Additionally, the intermittent nature of many DG energy sources such as photovoltaics (PV) can present a number of challenges to voltage regulation, etc. This presentation provides an overview a number of Smart Grid projects being performed by the National Renewable Energy Laboratory (NREL) along with utility, industry, and academic partners. These projects include modeling and analysis of high penetration PV scenarios (with and without energy storage), development and testing of interconnection and microgrid equipment, as well as the development and implementation of advanced instrumentation and data acquisition used to analyze the impacts of intermittent renewable resources. Additionally, standards development associated with DG interconnection and analysis as well as Smart Grid interoperability will be discussed.

  7. Status of NICA project

    SciTech Connect

    Meshkov, I. N.

    2012-05-15

    The project of Nuclotron-based Ion Collider fAcility NICA/MPD (+MultiPurpose Detector) under development at JINR (Dubna) is presented. The general goals of the project are providing of colliding beams for experimental studies of both hot and dense strongly interacting baryonicmatter and search for the mixed phase and critical endpoint and spin physics in collisions of polarized protons (deuterons). The first program requires providing of heavy-ion collisions in the energy range of {radical}s{sub NN} = 4 - 11 GeV at average luminosity of L = 1 Multiplication-Sign 10{sup 27} cm{sup -2} s{sup -1} for {sup 197}Au{sup 79+}. The polarized beams mode is proposed to be used in energy range of {radical}s = 12 - 27 GeV (protons) at luminosity of L {>=} 1 Multiplication-Sign 10{sup 30} cm{sup -2} s{sup -1}. The report contains description of the facility scheme and characteristics in heavy-ion operation mode, status and plans of the project development.

  8. ISIS and META projects

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth; Cooper, Robert; Marzullo, Keith

    1990-01-01

    ISIS and META are two distributed systems projects at Cornell University. The ISIS project, has developed a new methodology, virtual synchrony, for writing robust distributed software. This approach is directly supported by the ISIS Toolkit, a programming system that is distributed to over 300 academic and industrial sites. Several interesting applications that exploit the strengths of ISIS, including an NFS-compatible replicated file system, are being developed. The META project, is about distributed control in a soft real time environment incorporating feedback. This domain encompasses examples as diverse as monitoring inventory and consumption on a factory floor and performing load-balancing on a distributed computing system. One of the first uses of META is for distributed application management: the tasks of configuring a distributed program, dynamically adapting to failures, and monitoring its performance. Recent progress and current plans are presented. This approach to distributed computing, a philosophy that is believed to significantly distinguish the work from that of others in the field, is explained.

  9. AIP's Career Pathways Project

    NASA Astrophysics Data System (ADS)

    Avila, Jose

    2014-03-01

    The American Institute of Physics (AIP) Career Pathways Project, funded by the National Science Foundation, aims to increase the number of undergraduates going into STEM careers. The main purposes of this project are to show students the professional opportunities for a STEM career, understand what departments can do to better prepare physics bachelor's degree recipients to enter the workforce, understand what students can do to better prepare themselves, and develop resources based on these findings. I was chosen by the Society of Physics Students (SPS) to be the 2013 summer intern of the AIP's Career Pathways Project. In this talk I will discuss several resources I worked on with the Statistical Research Center of the American Institute of Physics and SPS. These resources include how to write a resume and cover letter, how to perform an informational interview, common job titles for physics bachelors, how to find career information in physics and STEM, how to search and use job postings, and how to network.

  10. The contoured auricular projection graft for nasal tip projection.

    PubMed

    Porter, J P; Tardy, M E; Cheng, J

    1999-01-01

    In all rhinoplasty surgery, the universal need exists to increase, decrease, or preserve existing tip projection. When proper tip projection is lacking, a variety of techniques are useful for improving projection. We describe a valuable technique for tip projection, particularly useful and indicated in the Asian rhinoplasty, African American rhinoplasty, and in certain revision rhinoplasties. In the past 15 years, the senior author (M.E.T.) has used the contoured auricular projection graft in selected patients for achieving satisfactory tip projection in patients with blunted tips. The aesthetic outcomes have been predictable, pleasing, and reliable for the long term. Precision pocket preparation for auricular conchal cartilage graft placement is key to symmetry and projection of the final outcome. The results yielded a rounded nasal tip that may be more natural-appearing in Asians, African Americans, and selected patients with revision rhinoplasty. The contoured auricular projection graft provides a highly useful graft for the nasal tip. PMID:10937122

  11. Project analysis and integration area

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The objective of the Project Analysis and Integration Area (PA&I) is to support the planning, analysis, integration, and decision making activities of the Flat-plate Solar Array FSA) Project. Accordingly, PA&I supports the Project by developing and documenting Project plans based, in part, on the technical and economic assessments performed by PA&I of the various technical options. Goals for module technical performance and costs, derived from National Photovoltaics Program goals, are established by PA&I for each of the major technical activities in the Project. Assessments of progress toward achievement of goals are made to guide decision making within the Project.

  12. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  13. Apollo Project - LOLA

    NASA Technical Reports Server (NTRS)

    1970-01-01

    Test subject sitting at the controls: Project LOLA or Lunar Orbit and Landing Approach was a simulator built at Langley to study problems related to landing on the lunar surface. It was a complex project that cost nearly $2 million dollars. James Hansen wrote: 'This simulator was designed to provide a pilot with a detailed visual encounter with the lunar surface; the machine consisted primarily of a cockpit, a closed-circuit TV system, and four large murals or scale models representing portions of the lunar surface as seen from various altitudes. The pilot in the cockpit moved along a track past these murals which would accustom him to the visual cues for controlling a spacecraft in the vicinity of the moon. Unfortunately, such a simulation--although great fun and quite aesthetic--was not helpful because flight in lunar orbit posed no special problems other than the rendezvous with the LEM, which the device did not simulate. Not long after the end of Apollo, the expensive machine was dismantled.' (p. 379) From Ellis J. White, 'Discussion of Three Typical Langley Research Center Simulation Programs,' Paper presented at the Eastern Simulation Council (EAI's Princeton Computation Center), Princeton, NJ, October 20, 1966. 'A typical mission would start with the first cart positioned on model 1 for the translunar approach and orbit establishment. After starting the descent, the second cart is readied on model 2 and, at the proper time, when superposition occurs, the pilot's scene is switched from model 1 to model 2. then cart 1 is moved to and readied on model 3. The procedure continues until an altitude of 150 feet is obtained. The cabin of the LM vehicle has four windows which represent a 45 degree field of view. The projection screens in front of each window represent 65 degrees which allows limited head motion before the edges of the display can be seen. The lunar scene is presented to the pilot by rear projection on the screens with four Schmidt television

  14. Smart Grid Demonstration Project

    SciTech Connect

    Miller, Craig; Carroll, Paul; Bell, Abigail

    2015-03-11

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and

  15. The Human Genome Diversity Project

    SciTech Connect

    Cavalli-Sforza, L.

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  16. Project Future Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…

  17. NEH Curriculum Integration Project: Selected Project Materials, 1981-1982.

    ERIC Educational Resources Information Center

    Arizona Univ., Tucson. Women's Studies Program.

    Materials from a project to integrate the new research on women into the University of Arizona curriculum are divided into four sections. Section I, recruitment, contains a letter describing the project to prospective faculty participants and a list of questions used to interview faculty for participation in the project. Section II contains an…

  18. Geothermal Outreach and Project Financing

    SciTech Connect

    Elizabeth Battocletti

    2006-04-06

    The ?Geothermal Outreach and Project Financing? project substantially added to the understanding of geothermal resources, technology, and small business development by both the general public as well as those in the geothermal community.

  19. Class Projects on the Internet.

    ERIC Educational Resources Information Center

    Nicholson, Danny

    1996-01-01

    Discusses the use of the Internet in the classroom. Presents a project on renewable energy sources in which students produce web pages. Provides the web page address of the project completed by students. (ASK)

  20. Middle/High School Project.

    ERIC Educational Resources Information Center

    Learning By Design, 2001

    2001-01-01

    Highlights middle school/high school construction projects that have won the Learning By Design Awards for 2001. Projects covered involve new school construction; and renovation, additions, and restoration. (GR)

  1. Health System Measurement Project: Quality

    MedlinePlus

    ... on individual measures in the Surgical Care Improvement Project (SCIP). The composite measure is the proportion of ... appropriate processes of care, as defined by the project. These processes include, for example, timeliness of antibiotics ...

  2. GONOCOCCAL SURVEILLANCE ISOLATE PROJECT (GSIP)

    EPA Science Inventory

    The Gonococcal Isolate Surveillance Project (GISP) is a collaborative project to monitor antimicrobial resistance in Neisseria gonorrhoeae in the United States. The database is a sentinel surveillance system of 26 clinics for sexually transmitted diseases (STDs) and 5 regional la...

  3. Planning a Multimedia Documentation Project.

    ERIC Educational Resources Information Center

    Rockley, Ann

    1994-01-01

    Outlines the process of planning and developing a multimedia documentation project. Discusses audience, task, and information analysis; selection of the most appropriate media; effective design; establishment of the development team; hardware and software requirements; costs; and project planning. (SR)

  4. Project-Based Teaching: Helping Students Make Project Connections

    NASA Astrophysics Data System (ADS)

    Johnson, Heather Jo Pusich

    Project-based curriculum materials are designed to support students in engaging with scientific content and practices in meaningful ways, with the goal of improving students' science learning. However, students need to understand the connections between what they are doing on a day-to-day basis with respect to the goals of the overall project for students to get the motivational and cognitive benefits of a project-based approach. In this dissertation, I looked at the challenges that four ninth grade science teachers faced as they helped students to make these connections using a project-based environmental science curriculum. The analysis revealed that in general when the curriculum materials made connections explicit, teachers were better able to articulate the relationship between the lesson and the project during enactment. However, whether the connections were explicit or implicit in the materials, enactments of the same lesson across teachers revealed that teachers leveraged different aspects of the project context in different ways depending on their knowledge, beliefs, and goals about project-based teaching. The quantitative analysis of student data indicated that when teacher enactments supported project goals explicitly, students made stronger connections between a lesson and the project goal. Therefore, a teacher's ability to make clear connections during classroom instruction is essential. Furthermore, when students made connections between each lesson and the larger project goals their attitudes toward the lesson were more positive and they performed better on the final assessment. These findings suggest that connections between individual lessons and the goals of the project are critical to the effectiveness of project-based learning. This study highlights that while some teachers were able to forge these connections successfully as a result of leveraging cognitive resources, teachers' beliefs, knowledge and goals about project-based teaching are

  5. Project SHARE - An interim report

    NASA Astrophysics Data System (ADS)

    Bouck, Gail P.; Stevenson, Jim; Gillick, David

    1987-05-01

    Project SHARE, a program sponsored jointly by the International Institute of Communications and Intersat, has been undertaken to foster telecommunications development in rural and remote areas of the world. Completed projects such as Teleeducation in the People's Republic of China and The American Society of Microbiology in Africa are discussed as well as projects currently in progress. Projects under active planning include Education in Pakistan through the Pakistan Space and Upper Atmosphere Research Commission and The Sky Channel of the Pacific.

  6. Managing a project's legacy: implications for organizations and project management

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  7. The EEE Project

    NASA Astrophysics Data System (ADS)

    Abbrescia, M.; An, S.; Antolini, R.; Badala, A.; Baldini Ferroli, R.; Bencivenni, G.; Blanco, F.; Bressan, E.; Chiavassa, A.; Chiri, C.; Cifarelli, L.; Cindolo, F.; Coccia, E.; de Pasquale, S.; di Giovanni, A.; d'Incecco, M.; Fabbri, F.L.; Frolov, V.; Garbini, M.; Gustavino, C.; Hatzifotiadou, D.; Imponente, G.; Kim, J.; La Rocca, P.; Librizzi, F.; Maggiora, A.; Menghetti, H.; Miozzi, S.; Moro, R.; Panareo, M.; Pappalardo, G.S.; Piragino, G.; Riggi, F.; Romano, F.; Sartorelli, G.; Sbarra, C.; Selvi, M.; Serci, S.; WIlliams, C.; Zichichi, A.; Zuyenski, R.

    The EEE (/Extreme Energy Event/) Project is an experiment for the study of very high-energy extensive air showers, actually starting in Italy. It is based on the detection of the shower muon component by means of a network of tracking detectors, installed in Italian High Schools. The Project, supported by the Ministero dell’Università e della Ricerca (MIUR), Istituto Nazionale di Fisica Nucleare (INFN), European Organization for Nuclear Research (CERN) and Museo Storico della Fisica e Centro Studi e Ricerche “E. Fermi” has been conceived by its leader Professor Antonino Zichichi. In its first phase the detector telescopes will be installed in 21 High Schools in 7 piloting cities all over Italy. The network will soon be heavily upgraded by increasing the number of High Schools and cities. The single tracking telescope is composed by 3 large (~ 2 m2 ) Multi-gap Resistive Plate Chambers (MRPC), realized with float glass electrodes. The use of particle detectors based on such MRPCs will allow to determine with a very high accuracy the direction of the axis of cosmic ray showers initiated by primaries of ultra-high energy, together with a high temporal resolution. The first MRPC telescope, installed in the Liceo Scientifico “B.Touschek” in Grottaferrata near the LNF-INFN site (nearby Rome), is successfully running. By the end of year 2007, the installation of the other telescopes will open the way for the first search of high-energy cosmic rays distant coincidences. In the future, serving many High Schools scattered all over the Italian territory, the EEE Project will also allow to investigate coincidences between multiple primaries producing distant showers. Here we present the experimental apparatus and its tasks.

  8. Final project report

    SciTech Connect

    Podzorov, Vitaly

    2012-10-28

    The scope of this project is to investigate fundamental aspects of self-assembled monolayers (SAMs) grown at the surface of organic semiconductors and other electronic materials, recently discovered in our group (Fig. 1) [1]. Understanding the growth mechanism and structure of these SAMs, as well as investigating the effect of SAM-induced high surface conductivity, are the main thrusts of the project. An additional thrust of the project is to find new ways of surface doping or surface gating of novel semiconductors, in which electronic traps at the interface would be passivated. Molecular self assembly is an exciting research area of modern materials science, playing an important role in a variety of emerging applications, such as organic and molecular electronics, bioengineering, sensors and actuators. The current effort in this field has been focused on two experimental platforms: SAMs on metals (e.g., Au) and SAMs on inorganic oxides (e.g., SiO2). We have recently discovered the third platform, molecular self-assembly at the surface of carbon-based electronic materials (organic semiconductors, graphene and CNTs), which opens new opportunities for fundamental research and applications (Fig. 1) [1, 2, 3]. One of the most intriguing aspects of the new discovery is that formation of an FTS self-assembled monolayer on these materials induces a high-density mobile charges, with n up to 1014 cm-2, resulting in a large surface conductivity, σ ≈ 10-5 S·square-1 [1]. The effect is due to an interfacial electron transfer from the semiconductor to the SAM, resulting in a 0.54 V potential drop across the 1.3 nm-thick SAM, as recently revealed by Kelvin probe microscopy in rubrene [4].

  9. Demonstration Projects: Implementation and Institutionalization.

    ERIC Educational Resources Information Center

    Bina, James V.; Hull, William L.

    Three purposes are listed for this paper: (1) to share the results of a national survey of vocational education exemplary projects; (2) to emphasize the importance of a project director's communication with five clientele audiences; and (3) to suggest specific actions likely to result in institutionalization of a demonstration project. A brief…

  10. The Fleming Applied Projects Program

    ERIC Educational Resources Information Center

    Spasov, Peter

    2004-01-01

    Applied Projects is a program where every technology student engages in an intensive team project full time during the final academic semester. A wide range of enterprises provide the real-world problems that form the basis of student projects. This article describes the program and how Fleming College uses this program for applied research. To…

  11. Astro tourism: Astro Izery project

    NASA Astrophysics Data System (ADS)

    Mrozek, Tomasz; Kołomański, Sylwester; Żakowicz, Grzegorz; Kornafel, Stanisław; Czarnecki, Tomasz L.; Suchan, Pavel; Kamiński, Zbigniew

    2015-03-01

    The Astro Izery project is carried by several institutions from Poland and Czech Republic. Its aim is to educate and inform tourists, who visit the Izery Mountains, about astronomy and light pollution. The project consists of two activities: permanent (sundials, planetary path etc.) and periodic (meetings, workshops). After five years the project is in good health and will gain more elements in next years.

  12. Project Management in Higher Education

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  13. Project WORKSMART. A Final Report.

    ERIC Educational Resources Information Center

    NashvilleREAD, Nashville, TN.

    Project WORKSMART was a Nashville, Tennessee-based workplace literacy project to provide an exemplary multidimensional workplace literacy program while simultaneously demonstrating products and practices that promote lifelong learning that can be customized and replicated in diverse work environments. The project was a partnership between…

  14. Operational Guidelines; Reading Improvement Project.

    ERIC Educational Resources Information Center

    Columbus Public Schools, OH.

    Operational procedures designed to increase the effectiveness of an ESEA/Title I Columbus, Ohio, public schools reading improvement project are presented. The project's three-pronged approach includes direct service to children, staff development, and program development. The rationale and objectives of the project are outlined. The multiple roles…

  15. Indian River Hydroelectric Project Grant

    SciTech Connect

    Rebecca Garrett

    2005-04-29

    This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

  16. Gifted Science Project: Evaluation Report.

    ERIC Educational Resources Information Center

    Ott, Susan L.; Emanuel, Elizabeth, Ed.

    The document contains the evaluation report on the Gifted Science Project in Montgomery County, Maryland, a program to identify resources for students in grades 3-8 who are motivated in science. The Project's primary product is a Project Resource File (PRF) listing people, places, and published materials that can be used by individual students. An…

  17. NIF Project Management System Description

    SciTech Connect

    Wolfe, C.R.

    1997-08-01

    This document has been prepared for two purposes: 1. To demonstrate compliance with the project management requirements of DOE Order 430. 1, Life-Cycle Asset Management (LCAM). 2. To summarize in one place the approved Project documents which, taken as a whole, describe the NIF Project Management System.

  18. The Project Approach. ERIC Digest.

    ERIC Educational Resources Information Center

    Katz, Lilian G.

    A project is an in-depth investigation of a topic worth learning more about, usually undertaken by a group of children within a class. The goal of a project is to learn more about a topic rather than to find answers to questions posed by a teacher. Project work is complementary to the systematic parts of a curriculum. Whereas systematic…

  19. Project IEP: Albama State Report.

    ERIC Educational Resources Information Center

    Penney, Catherine

    The document reports the Alabama component of Project IEP (individualized education program), a project designed to identify and clarify perceptions related to roles in the IEP process as mandated by P.L. 94-142, the Education for All Handicapped Children Act. It is explained that under Project IEP approximately 200 persons (including state and…

  20. Project IEP: Wisconsin State Report.

    ERIC Educational Resources Information Center

    Norton, Barbara Dwyer

    The document reports the Wisconsin component of Project IEP (individualized education program), a project designed to identify and clarify perceptions related to roles in the IEP process as mandated by P.L. 94-142, the Education for All Handicapped Children Act. It is explained that under Project IEP approximately 200 persons (including state and…

  1. Project IEP: Washington State Report.

    ERIC Educational Resources Information Center

    Lewis, Linda M.

    The document reports the Washington component of Project IEP (individualized education program), a project designed to identify and clarify perceptions related to roles in the IEP process as mandated by P.L. 94-142, the Education for All Handicapped Children Act. It is explained that under Project IEP approximately 200 persons (including state and…

  2. Measuring Impact of Demonstration Projects.

    ERIC Educational Resources Information Center

    Fleischman, Howard L.

    A proposed evaluation model for measuring the impact of demonstration projects in vocational education defines sets of criteria, standards, and documentation for both interim and final acceptable evidence of project impact. Interim acceptable evidence is that evidence of project success which should be expected during the demonstration grant…

  3. 6 Project-Management Tips

    ERIC Educational Resources Information Center

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  4. VISTA: project status

    NASA Astrophysics Data System (ADS)

    McPherson, Alistair M.; Born, Andrew; Sutherland, Will; Emerson, Jim; Little, Bryan; Jeffers, Paul; Stewart, Malcolm; Murray, John; Ward, Kim

    2006-06-01

    VISTA is a 4-m wide field survey telescope with a near infra-red camera and a demanding f/1 primary design now well into its manufacturing phase. We contracted out major items, and generated a coordinated approach to the management of engineering budgets through systems engineering, risks through risk management, and safety through the generation of safety cases. Control of the interfaces and science requirements has been maintained and developed through the current phase. The project is developing the commissioning plan to deliver an effective and safe facility. The current status of VISTA is presented as we move towards the on site integration phase.

  5. Bonanza project, 1971

    NASA Technical Reports Server (NTRS)

    Lee, K.

    1972-01-01

    Research on the application of remote sensing techniques to the mineral industry stresses photointerpretation by human interpreter experienced in the extraction of geological information from aerial color and multiband photographs and from thermal scanner imagery. Also considered are optical and digital image enhancement, multiband color additive projection, video image processing, and computer reduction and analysis of infrared spectrometry. Evaluation of those parameters which have the most contrast between adjacent rock formations and which can be remotely sensed establish the following most useful geological characteristics: Topographic landform, color, albedo, and surface temperature.

  6. The RHIC project

    SciTech Connect

    Harrison, M.A.

    1996-07-01

    The design and construction status of the Relativistic Heavy Ion collider (RHIC) is discussed. Those novel features of a heavy ion collider that are distinct from hadron colliders in general are noted. These features are derived from the experimental requirements of operation with a variety of ion species over a wide energy range including collisions between ions of unequal energies. The project is in the fourth year of a seven year construction cycle. A review of the superconducting magnet program is given together with progress to date on the machine construction.

  7. Planning Complex Projects Automatically

    NASA Technical Reports Server (NTRS)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  8. Tomcat-Projects_RF

    SciTech Connect

    Warrant, Marilyn M.; Garcia, Rudy J.; Zhang, Pengchu; Arms, Robert M.; Herzer, John A.; Conrad, Gregory N.; Brabson, John M.

    2004-09-15

    Tomcat-Projects_RF is a software package for analyzing sensor data obtained from a database and displaying the results with Java Servlet Pages (JSP). SQL Views into the dataset are tailored for personnel having different roles in monitoring the items in a storage facility. For example, an inspector, a host treaty compliance officer, a system engineer and software developers were the users identified that would need to access data at different levels of detail, The analysis provides a high level status of the storage facility and allows the user to go deeper into the data details if the user desires.

  9. STEAM GENERATOR GROUP PROJECT

    SciTech Connect

    Clark, R. A.; Lewis, M

    1985-09-01

    This report is a summary of progress in the Surry Steam Generator Group Project for 1984. Information is presented on the analysis of two baseline eddy current inspections of the generator. Round robin series of tests using standard in-service inspection techniques are described along with some preliminary results. Observations are reported of degradation found on tubing specimens removed from the generator, and on support plates characterized in-situ. Residual stresses measured on a tubing specimen are reported. Two steam generator repair demonstrations are described; one for antivibration bar replacement, and one on tube repair methods. Chemical analyses are shown for sludge samples removed from above the tube sheet.

  10. Tomcat-Projects_RF

    Energy Science and Technology Software Center (ESTSC)

    2004-09-15

    Tomcat-Projects_RF is a software package for analyzing sensor data obtained from a database and displaying the results with Java Servlet Pages (JSP). SQL Views into the dataset are tailored for personnel having different roles in monitoring the items in a storage facility. For example, an inspector, a host treaty compliance officer, a system engineer and software developers were the users identified that would need to access data at different levels of detail, The analysis providesmore » a high level status of the storage facility and allows the user to go deeper into the data details if the user desires.« less

  11. Autostereoscopic projection viewer

    DOEpatents

    Toeppen, John S.

    2006-12-19

    An autostereoscopic viewer is employed to produce aberration corrected images to simulate a virtual presence by employing pairs of projector optical components coupled with an image corrector plate and a field lens. Images are designed with magnifications and optical qualities and positioned at predetermined eyezones having controlled directional properties. The viewer's eyes are positioned in these eyezones. The size of these zones is related to the aperture of the projection lenses, the magnification produced by the Fresnel(s), and the optical properties and position of the image corrector plate.

  12. Hawaii geothermal project

    NASA Technical Reports Server (NTRS)

    Kamins, R. M.

    1974-01-01

    Hawaii's Geothermal Project is investigating the occurrence of geothermal resources in the archipelago, initially on the Island of Hawaii. The state's interest in geothermal development is keen, since it is almost totally dependent on imported oil for energy. Geothermal development in Hawaii may require greater participation by the public sector than has been true in California. The initial exploration has been financed by the national, state, and county governments. Maximization of net benefits may call for multiple use of geothermal resources; the extraction of by-products and the application of treated effluents to agricultural and aquacultural uses.

  13. NDLGS project update

    SciTech Connect

    Lienert, Thomas J; Sutton, Jacob O; Piltch, Martin S; Lujan, Dennis J

    2011-01-14

    Recent results for laser and ESD processing for the NDLGS project will be reviewed. Conclusions are: (1) Short mix passes have profound effect on window T; (2) Multiple drill and re-weld at single location has been shown to be feasible and successful; (3) Kapton beam profiling method has been successfully developed. Comparison of 100 mm and 120 mm lenses gives reasonable and consistent results; (4) Manifold pumpdown data has been presented; (5) ESO results can be accurately predicted once a repeatable efficiency has been established; and (6) The electrode-workpiece geometry may play an important on ESO efficiency. Experiments are planned to investigate these effects.

  14. Bronx Zoo cogeneration project

    SciTech Connect

    Rivet, P.H.

    1988-09-01

    The New York Zoological Society commenced feasibility studies for a proposed cogeneration and district heating system for the Bronz Zoo in spring 1982. Early studies focused on evaluating the Zoo's energy loads, infrastructure, and energy delivery and financing systems. The Zoological Society and New York City joined in the decision to support the construction of a system which would serve not only the Bronx Zoo but also five nearby City-funded installations, including the adjacent New York Botanical Garden. Since the submission of that study, the project has been modified in scope, scaling back to a generating capacity designed to serve only the Bronz Zoo.

  15. Overview of Project Orion

    NASA Astrophysics Data System (ADS)

    Hopps, Nick W.; Bett, Thomas H.; Cann, Nicolas; Danson, Colin N.; Duffield, Stuart J.; Egan, David A.; Elsmere, Stephen P.; Girling, Mark T.; Harvey, Ewan J.; Hillier, David I.; Hoarty, David J.; Jinks, Paul M. R.; Norman, Michael J.; Parker, Stefan J. F.; Treadwell, Paul A.; Winter, David N.

    2011-03-01

    Project Orion will provide a facility for performing high energy density plasma physics experiments at AWE. The laser consists of ten, nanosecond beam lines delivering a total of 5kJ with 0.1-5ns temporally shaped pulses and two short pulse beam lines, each producing 500J in 0.5ps with intensity > 10^21 W/cm^2. The performance of the Orion laser is reported as the first phase of commissioning (one short and one long pulse beam) concludes. Target shots with all beam lines will begin in 2012.

  16. The Ribosomal Database Project.

    PubMed Central

    Maidak, B L; Larsen, N; McCaughey, M J; Overbeek, R; Olsen, G J; Fogel, K; Blandy, J; Woese, C R

    1994-01-01

    The Ribosomal Database Project (RDP) is a curated database that offers ribosome-related data, analysis services, and associated computer programs. The offerings include phylogenetically ordered alignments of ribosomal RNA (rRNA) sequences, derived phylogenetic trees, rRNA secondary structure diagrams, and various software for handling, analyzing and displaying alignments and trees. The data are available via anonymous ftp (rdp.life.uiuc.edu), electronic mail (server/rdp.life.uiuc.edu) and gopher (rdpgopher.life.uiuc.edu). The electronic mail server also provides ribosomal probe checking, approximate phylogenetic placement of user-submitted sequences, screening for chimeric nature of newly sequenced rRNAs, and automated alignment. PMID:7524021

  17. Project Earth Lover

    SciTech Connect

    Slobotski, Stephanie,

    2011-09-01

    Under this project, the Ponca Tribe of Nebraska (PTN) will conduct An Energy Options Analysis (EOA) to empower Tribal Leadership with critical information to allow them to effectively screen energy options that will further develop the Tribe's long-term strategic plan and energy vision. The PTN will also provide community workshops to enhance Tribal Members' capabilities, skills and awareness of energy efficiency and conservation technology and practices. A 90- minute workshop will be conducted at each of the 5 sites and one-hundred tribal members will receive an erergy efficiency kit.

  18. THE BIOCATALYTIC DESULFURIZATION PROJECT

    SciTech Connect

    Steven E. Bonde; David Nunn

    2003-01-01

    During the first quarter of the Biological Desulfurization project several activities were pursued. A project kickoff meeting was held at the Diversa facility in San Diego, CA. Activities that were in process before the meeting and begun afterwards by Diversa Corporation and Petro Star Inc. include: Technology transfer in the form of information generated by Enchira to Diversa, the purchase and installation of equipment by Diversa, development of synthetic methods and preparation of organo-sulfur substrates for use in determining enzyme activities, production of extract via Petro Star's CED process, detailed analysis of Petro Star Inc. diesel and CED extract, and several activities in molecular biology. Diversa Corporation, in the area of molecular biology, engaged in several activities in support of the task list of the contract. These included: construction of a genomic library; development and utilization of a sequence-based gene discovery effort; a parallel discovery approach based on functional expression of enzymes with the ability to oxidize organosulfur compounds. Biodesulfurization genes have already been identified and are being sequenced and subcloned for expression in heterologous biological hosts. Diversa has evaluated and adapted assays developed by Enchira used to assess the activities of DBT and DBTO{sub 2} monooxygenases. Finally, Diversa personnel have developed two novel selection/screen strategies for the improvement of biocatalyst strains by directed evolution.

  19. The Human Variome Project.

    PubMed

    Burn, John; Watson, Michael

    2016-06-01

    The practical realization of genomics has meant a growing realization that variant interpretation is a major barrier to practical use of DNA sequence data. The late Professor Dick Cotton devoted his life to innovation in molecular genetics and was a prime mover in the international response to the need to understand the "variome." His leadership resulted in the launch first of the Human Genetic Variation Society and then, in 2006, an international agreement to launch the Human Variome Project (HVP), aimed at data integration enabled by standards and infrastructure of the databases of variants being identified in families with a range of inherited disorders. The project attracted a network of affiliates across 81 countries and earned formal recognition by UNESCO, which now hosts its biennial meetings. It has also signed a Memorandum of Understanding with the World Health Organization. Future progress will depend on longer term secure funding and integration with the efforts of the genomics community where the rapid advances in sequencing technology have enabled variant capture on a previously unimaginable scale. Efforts are underway to integrate the efforts of HVP with those of the Global Alliance for Genomics and Health to provide a lasting legacy of Dick Cotton's vision. PMID:26987309

  20. Device Oriented Project Controller

    SciTech Connect

    Dalesio, Leo; Kraimer, Martin

    2013-11-20

    This proposal is directed at the issue of developing control systems for very large HEP projects. A de-facto standard in accelerator control is the Experimental Physics and Industrial Control System (EPICS), which has been applied successfully to many physics projects. EPICS is a channel based system that requires that each channel of each device be configured and controlled. In Phase I, the feasibility of a device oriented extension to the distributed channel database was demonstrated by prototyping a device aware version of an EPICS I/O controller that functions with the current version of the channel access communication protocol. Extensions have been made to the grammar to define the database. Only a multi-stage position controller with limit switches was developed in the demonstration, but the grammar should support a full range of functional record types. In phase II, a full set of record types will be developed to support all existing record types, a set of process control functions for closed loop control, and support for experimental beam line control. A tool to configure these records will be developed. A communication protocol will be developed or extensions will be made to Channel Access to support introspection of components of a device. Performance bench marks will be made on both communication protocol and the database. After these records and performance tests are under way, a second of the grammar will be undertaken.