Science.gov

Sample records for project environmental microbiology

  1. Environmental microbiology

    SciTech Connect

    Mitchell, R.

    1992-01-01

    This book covers issues ranging from global climate changes to biocontrol of plant diseases. Many of its contributions stress how new technologies in areas such as molecular biology and environmental engineering expand understanding and applications of basic concepts in environmental microbiology. Articles in the book are in three basic subject areas: effects of environmental contamination on the role of microbes in geochemical cycling of the major elements, pathogens in the environment, and microbial activities in environmental management.

  2. Project environmental microbiology as related to planetary quarantine

    NASA Technical Reports Server (NTRS)

    Pflug, I. J.

    1974-01-01

    Microbiological analyses of soil particles allow for the following conclusions: (1) there is a considerable range in the values of aerobic, mesophilic microbial counts associated with different size soil fractions; (2) as soil particle size increases, there is an increase in the mean microbial concentration per particle; (3) plate counts of aerobic, mesophilic organisms in unheated soils yielded a mean concentration of about six organisms per particle for the smallest soil fraction; (4) aerobic, mesophilic counts for sonicated particles heated at 80 C for 20 minutes yielded mean values of about two organisms per particle for the smallest particles; (5) some actinomycetes associated with the soil fractions could survive dry heat treatment at 110 C for one hour; and (6) soil particles stored under ambient laboratory conditions for 2.5 years aerobic, mesophilic plate counts which were comparable or slightly greater than the counts for more recently collected soil.

  3. [Environmental microbiological control].

    PubMed

    Martín Salas, Carmen; Tordoya Titichoca, Igberto J; Ezpeleta Baquedano, Carmen

    2016-07-01

    The environmental microbiological control is necessary to prevent infections associated with certain procedures that are performed at the hospital. In this review the procedures for control of water and dialysis fluids, and air in operating rooms and immunocompromised units are addressed. The dialysis quality management guidelines define the highest levels of chemical, microbiological and endotoxin in purified water and dialysis fluids based on the recommendations of scientific societies. The microbiological control of water and dialysis fluids should include detection of microorganisms and endotoxin levels. Regarding the microbiological air sampling of operating rooms and immunocompromised units the types of clean rooms in which is recommended to perform microbiological air monitoring; the sample collection methods; culture media; incubation conditions; the most common microorganisms, and permissible levels depending on the type of surgery are described. PMID:27474243

  4. INTRODUCTION TO ENVIRONMENTAL MICROBIOLOGY

    EPA Science Inventory

    Environmental microbiology is the study of those microorganisms which exist in natural or artificial environments. The origin of scientific research in this field rests in the observations of Antony van Leewenhoeck that were published in 1677(4). Van Leewenhoeck used a microsco...

  5. Microbiological and ecological responses to global environmental changes in polar regions (MERGE): An IPY core coordinating project

    NASA Astrophysics Data System (ADS)

    Naganuma, Takeshi; Wilmotte, Annick

    2009-11-01

    An integrated program, “Microbiological and ecological responses to global environmental changes in polar regions” (MERGE), was proposed in the International Polar Year (IPY) 2007-2008 and endorsed by the IPY committee as a coordinating proposal. MERGE hosts original proposals to the IPY and facilitates their funding. MERGE selected three key questions to produce scientific achievements. Prokaryotic and eukaryotic organisms in terrestrial, lacustrine, and supraglacial habitats were targeted according to diversity and biogeography; food webs and ecosystem evolution; and linkages between biological, chemical, and physical processes in the supraglacial biome. MERGE hosted 13 original and seven additional proposals, with two full proposals. It respected the priorities and achievements of the individual proposals and aimed to unify their significant results. Ideas and projects followed a bottom-up rather than a top-down approach. We intend to inform the MERGE community of the initial results and encourage ongoing collaboration. Scientists from non-polar regions have also participated and are encouraged to remain involved in MERGE. MERGE is formed by scientists from Argentina, Australia, Austria, Belgium, Brazil, Bulgaria, Canada, Egypt, Finland, France, Germany, Italy, Japan, Korea, Malaysia, New Zealand, Philippines, Poland, Russia, Spain, UK, Uruguay, USA, and Vietnam, and associates from Chile, Denmark, Netherlands, and Norway.

  6. Manual of Environmental Microbiology - Literature Review.

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The field of environmental microbiology has made tremendous strides since the original microscopic observations of Antony van Leeuwenhock in 1677. The Manual of Environmental Microbiology, 3rd edition embraces these technological advances and is perhaps the most comprehensive and informative book s...

  7. Sampling and Data Analysis for Environmental Microbiology

    SciTech Connect

    Murray, Christopher J.

    2001-06-01

    A brief review of the literature indicates the importance of statistical analysis in applied and environmental microbiology. Sampling designs are particularly important for successful studies, and it is highly recommended that researchers review their sampling design before heading to the laboratory or the field. Most statisticians have numerous stories of scientists who approached them after their study was complete only to have to tell them that the data they gathered could not be used to test the hypothesis they wanted to address. Once the data are gathered, a large and complex body of statistical techniques are available for analysis of the data. Those methods include both numerical and graphical techniques for exploratory characterization of the data. Hypothesis testing and analysis of variance (ANOVA) are techniques that can be used to compare the mean and variance of two or more groups of samples. Regression can be used to examine the relationships between sets of variables and is often used to examine the dependence of microbiological populations on microbiological parameters. Multivariate statistics provides several methods that can be used for interpretation of datasets with a large number of variables and to partition samples into similar groups, a task that is very common in taxonomy, but also has applications in other fields of microbiology. Geostatistics and other techniques have been used to examine the spatial distribution of microorganisms. The objectives of this chapter are to provide a brief survey of some of the statistical techniques that can be used for sample design and data analysis of microbiological data in environmental studies, and to provide some examples of their use from the literature.

  8. 2009 Applied and Environmental Microbiology GRC

    SciTech Connect

    Nicole Dubilier

    2009-07-12

    The topic of the 2009 Gordon Conference on Applied and Environmental Microbiology is: From Single Cells to the Environment. The Conference will present and discuss cutting-edge research on applied and environmental microbiology with a focus on understanding interactions between microorganisms and the environment at levels ranging from single cells to complex communities. The Conference will feature a wide range of topics such as single cell techniques (including genomics, imaging, and NanoSIMS), microbial diversity at scales ranging from clonal to global, environmental 'meta-omics', biodegradation and bioremediation, metal - microbe interactions, animal microbiomes and symbioses. The Conference will bring together investigators who are at the forefront of their field, and will provide opportunities for junior scientists and graduate students to present their work in poster format and exchange ideas with leaders in the field. Some poster presenters will be selected for short talks. The collegial atmosphere of this Conference, with extensive discussion sessions as well as opportunities for informal gatherings in the afternoons and evenings, provides an ideal setting for scientists from different disciplines to exchange ideas, brainstorm and discuss cross-disciplinary collaborations.

  9. Applied and Environmental Microbiology Gordon Research Conference

    SciTech Connect

    Wall, Judy D.

    2003-11-19

    The main objective of the Gordon Research Conference on Applied and Environmental Microbiology was to present and discuss new, fundamental research findings on microorganisms, their activities in the environment, their ecosystem-level effects, and their environmental or commercial applications. To accomplish this goal, knowledge of microbial diversity, interactions and population dynamics was required. The genomic basis of microbial processes, the cycling of naturally occurring and hazardous substances, and methodologies to assess the functional relationships of microorganisms in their habitats were essential for understanding the ecological consequences of microbial activities and the formulation of generalizing principles. In the last decade, molecular technology has revealed that microbial diversity is far more extensive than the limited view obtained from culturing procedures. Great advances in environmental microbiology have resulted from the development and application of molecular approaches to ecology and molecular evolution. A further surprise resulting from the application of these new tools is the blurring of the distinction between pathogenic traits versus those considered non-pathogenic. This year's conference addressed the issues of biodiversity, its development, and the impact of stress on gene selection and expression. In addition microbial metabolic versatility with toxins such as heavy metals, antibiotics, and organic pollutants were discussed. The nine session topics were (1) biodiversity and the bacterial species, (2) mechanisms of biodiversification, (3) biofilms in health and environment, (4) a genomic view of microbial response to stress, (5) microbial use of toxic metals, (6) microbial mineral formation and dissolution, (7) power and limitations of antimicrobials, (8) biodegradation of organic pollutants, and (9) astrobiology. The Conference had an international profile: the Conference Vice-Chair, Dr. Gerard Muyzer, was from The Nether lands

  10. 76 FR 63615 - Environmental Science Center Microbiology Laboratory; Notice of Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-13

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Environmental Science Center Microbiology Laboratory; Notice of Public Meeting AGENCY... discussions which will be held at the EPA Environmental Science Center Microbiology Laboratory. DATES:...

  11. Application of phenotypic microarrays to environmental microbiology

    SciTech Connect

    Borglin, sharon; Joyner, Dominique; DeAngelis, Kristen; Khudyakov, Jane; D'haeseleer, Patrik; Joachimiak, Marcin; Hazen, Terry C; Fagan, Lisa Anne

    2012-01-01

    Environmental organisms are extremely diverse and only a small fraction has been successfully cultured in the laboratory. Culture in micro wells provides a method for rapid screening of a wide variety of growth conditions and commercially available plates contain a large number of substrates, nutrient sources, and inhibitors, which can provide an assessment of the phenotype of an organism. This review describes applications of phenotype arrays to anaerobic and thermophilic microorganisms, use of the plates in stress response studies, in development of culture media for newly discovered strains, and for assessment of phenotype of environmental communities. Also discussed are considerations and challenges in data interpretation and visualization, including data normalization, statistics, and curve fitting.

  12. Environmental microbiology as related to planetary quarantine

    NASA Technical Reports Server (NTRS)

    Pflug, I. J.

    1971-01-01

    The experiments carried out to determine the effects of temperature and relative humidity on the survival rate of Bacillus subtillis var. niger spores are reported. The experiments were conducted in environmental chambers at temperatures of 75 and 90 C. Data are also included on the survival characteristics of the spores suspended in sucrose solutions at 90 C with water activities of 0.99, 0.9, and 0.85

  13. Microbiology

    ERIC Educational Resources Information Center

    Spooner, D.

    1973-01-01

    Describes various types of training programs carried out in the study of microbiology. Indicates that the need for new energy sources and the expansion of medical schools and food industry may lead to an increasing demand for qualified microbiologists. (CC)

  14. Microbiology

    ERIC Educational Resources Information Center

    Anderson, Lucia

    1976-01-01

    Presents classroom activities for teaching microbiology at the elementary and secondary levels. Activities demonstrate the existence of the microbial world, types of microbes, and their growth needs and effects in nature. (MLH)

  15. Environmental microbiology as related to planetary quarantine

    NASA Technical Reports Server (NTRS)

    Pflug, I. J.

    1972-01-01

    The experimental design of a study to evaluate the effect of different cleaning methods and storage conditions on the dry heat resistance of Bacillus subtilis var. niger spores is described and the results for the first evaluation are reported. Specifically, the synergistic effect which occurs when spores are subjected simultaneously to dry heat and gamma radiation so as to be able to specify thermoradiation sterilization cycles was investigated. Attempts were made to understand the underlying mechanism(s) that lead to spore death from this combination of stresses. Data cover: (1) the survival of spores on surfaces at various temperatures in a precisely controlled environmental system, (2) the rate of destruction of these spores at ambient temperature when subjected to gamma radiation, and (3) the rate of destruction of spores when they are subjected to combined gamma radiation and thermal stresses.

  16. Micron2 Lab: Microfluidic Microbiology Lab Project

    NASA Technical Reports Server (NTRS)

    Burton, Aaron; Botkin, Douglas; Castro, Sarah; Crucian, Brian

    2015-01-01

    Microbial monitoring during spaceflight is crucial to maintain crew health and ensure water purifications systems are functioning properly. Current protocols for in-flight enumeration of bacteria in potable water systems require culture based methods. In this project, we aim to develop a flight- and microgravity-compatible flow cytometer capable of counting total microbial counts in the water supply and differentiating live from dead bacteria.

  17. Applications of MALDI-TOF MS in environmental microbiology.

    PubMed

    Santos, Inês C; Hildenbrand, Zacariah L; Schug, Kevin A

    2016-05-10

    Matrix-assisted laser desorption ionization time-of-flight (MALDI-TOF) mass spectrometry (MS) is an emerging technique for microbial identification, characterization, and typing. The single colony method can be used for obtaining a protein fingerprint or profile unique to each microorganism. This technique has been mainly used in the clinical field, but it also has significant potential in the environmental field. The applications of MALDI-TOF MS in environmental microbiology are discussed in this review. An overview on the use of MALDI-TOF MS for environmental proteomics and metabolomics is given as well as its use for bacterial strain typing and bioremediation research. A more detailed review on the use of this technique for the identification, differentiation, and categorization of environmental microorganisms is given. Some of the parameters that can influence the results and reproducibility of MALDI-TOF MS are also discussed. PMID:27072574

  18. Prospects for microbiological solutions to environmental pollution with plastics.

    PubMed

    Krueger, Martin C; Harms, Hauke; Schlosser, Dietmar

    2015-11-01

    Synthetic polymers, commonly named plastics, are among the most widespread anthropogenic pollutants of marine, limnic and terrestrial ecosystems. Disruptive effects of plastics are known to threaten wildlife and exert effects on natural food webs, but signs for and knowledge on plastic biodegradation are limited. Microorganisms are the most promising candidates for an eventual bioremediation of environmental plastics. Laboratory studies have reported various effects of microorganisms on many types of polymers, usually by enzymatic hydrolysis or oxidation. However, most common plastics have proved to be highly recalcitrant even under conditions known to favour microbial degradation. Knowledge on environmental degradation is yet scarcer. With this review, we provide a comprehensive overview of the current knowledge on microbiological degradation of several of the most common plastic types. Furthermore, we illustrate the analytical challenges concerning the evaluation of plastic biodegradation as well as constraints likely standing against the evolution of effective biodegradation pathways. PMID:26318446

  19. ENVIRONMENTAL BENIGN MITIGATION OF MICROBIOLOGICALLY INFLUENCED CORROSION (MIC)

    SciTech Connect

    J.R. Paterek

    2002-03-01

    The overall program objective is to develop and evaluate environmental benign agents or products that are effective in the prevention, inhibition, and mitigation of microbially influenced corrosion (MIC) in the internal surfaces of metallic natural gas pipelines. The goal is one or more environmental benign, a.k.a. ''green'' products that can be applied to maintain the structure and dependability of the natural gas infrastructure. The technical approach for this quarter has been to evaluate a number of real world pipeline sources for microbial communities or consortia that form biofilms under laboratory simulations of pipelines. The microorganisms will be identified using classical and molecular microbiological tools and there activities under pipeline simulating conditions will be studied. The quarter saw the collection of the first samples from the industry for isolation of the microorganisms, as well as the design and construction of the laboratory-scale pipeline simulators. Methods development for MIC and biofilm microbial isolations and identification, and laboratory design and construction of pipeline simulators were the only activities. At this stage of the study (first quarter), only preliminary results are available.

  20. ENVIRONMENTAL MONITORING FOR PUBLIC ACCESS AND COMMUNITY TRACKING (EMPACT) PROGRAM MICROBIOLOGICAL MONITORING OF RECREATIONAL WATER

    EPA Science Inventory

    Current Environmental Protection Agency (EPA) recommended microbiological monitoring practices for bathing beach water quality were suggested in 1968, as a part of the fecal coliform guideline developed by the Federal Water Pollution Control Administration. The guideline stated ...

  1. Planned Environmental Microbiology Aspects of Future Lunar and Mars Missions

    NASA Technical Reports Server (NTRS)

    Ott, C. Mark; Castro, Victoria A.; Pierson, Duane L.

    2006-01-01

    With the establishment of the Constellation Program, NASA has initiated efforts designed similar to the Apollo Program to return to the moon and subsequently travel to Mars. Early lunar sorties will take 4 crewmembers to the moon for 4 to 7 days. Later missions will increase in duration up to 6 months as a lunar habitat is constructed. These missions and vehicle designs are the forerunners of further missions destined for human exploration of Mars. Throughout the planning and design process, lessons learned from the International Space Station (ISS) and past programs will be implemented toward future exploration goals. The standards and requirements for these missions will vary depending on life support systems, mission duration, crew activities, and payloads. From a microbiological perspective, preventative measures will remain the primary techniques to mitigate microbial risk. Thus, most of the effort will focus on stringent preflight monitoring requirements and engineering controls designed into the vehicle, such as HEPA air filters. Due to volume constraints in the CEV, in-flight monitoring will be limited for short-duration missions to the measurement of biocide concentration for water potability. Once long-duration habitation begins on the lunar surface, a more extensive environmental monitoring plan will be initiated. However, limited in-flight volume constraints and the inability to return samples to Earth will increase the need for crew capabilities in determining the nature of contamination problems and method of remediation. In addition, limited shelf life of current monitoring hardware consumables and limited capabilities to dispose of biohazardous trash will drive flight hardware toward non-culture based methodologies, such as hardware that rapidly distinguishes biotic versus abiotic surface contamination. As missions progress to Mars, environmental systems will depend heavily on regeneration of air and water and biological waste remediation and

  2. Clinical Application Projects (CAPs) for Health Science Students in Introductory Microbiology.

    ERIC Educational Resources Information Center

    Halyard, Rebecca A.

    Clinical Application Projects (CAPs) have been developed that allow dental hygiene and nursing students to apply introductory microbiology principles and skills learned in lecture and laboratory to a problem in an appropriate clinical situation. CAPs therefore substitute for the traditional study of "unknowns". Principles and processes emphasized…

  3. Applied and Environmental Microbiology [agenda and attendee list

    SciTech Connect

    1999-07-03

    Conference sessions were held on the following topics: Microbes, metals and metabolism; Biological weapons, facts and fiction; Antimicrobials in food safety and human health; Microbial DNA chips; Global processes, microorganisms and molecular ecology; Microbes, art and artifacts; Functional genomics of environmental strains; and Biodegradation and biotransformation breakthroughs. There was also a special lecture titled ''The hand is quicker than a sneeze as a disseminator of disease.''

  4. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  5. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  6. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1991-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates.

  7. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-02-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates.

  8. ENVIRONMENTALLY BENIGN MITIGATION OF MICROBIOLOGICALLY INFLUENCED CORROSION (MIC)

    SciTech Connect

    John J. Kilbane II; William Bogan

    2004-01-31

    The overall program objective is to develop and evaluate environmentally benign agents or products that are effective in the prevention, inhibition, and mitigation of microbially influenced corrosion (MIC) in the internal surfaces of metallic natural gas pipelines. The goal is to develop one or more environmentally benign (a.k.a. ''green'') products that can be applied to maintain the structure and dependability of the natural gas infrastructure. The technical approach for this quarter included the fractionation of extracts prepared from several varieties of pepper plants, and using several solvents, by high performance liquid chromatography (HPLC). A preliminary determination of antimicrobial activities of the new extracts and fractions using a growth inhibition assay, and evaluation of the extracts ability to inhibit biofilm formation was also performed. The analysis of multiple extracts of pepper plants and fractions of extracts of pepper plants obtained by HPLC illustrated that these extracts and fractions are extremely complex mixtures of chemicals. Gas chromatography-mass spectrometry was used to identify the chemical constituents of these extracts and fractions to the greatest degree possible. Analysis of the chemical composition of various extracts of pepper plants has illustrated the complexity of the chemical mixtures present, and while additional work will be performed to further characterize the extracts to identify bioactive compounds the focus of efforts should now shift to an evaluation of the ability of extracts to inhibit corrosion in mixed culture biofilms, and in pure cultures of bacterial types which are known or believed to be important in corrosion.

  9. ENVIRONMENTALLY BENIGN MITIGATION OF MICROBIOLOGICALLY INFLUENCED CORROSION (MIC)

    SciTech Connect

    J. Robert Paterek; Gemma Husmillo

    2002-07-01

    The overall program objective is to develop and evaluate environmental benign agents or products that are effective in the prevention, inhibition, and mitigation of microbially influenced corrosion (MIC) in the internal surfaces of metallic natural gas pipelines. The goal is one or more environmental benign, a.k.a. ''green'' products that can be applied to maintain the structure and dependability of the natural gas infrastructure. Capsicum sp. extracts and pure compounds were screened for their antimicrobial activity against MIC causing bacteria. Studies on the ability of these compounds to dissociate biofilm from the substratum were conducted using microtiter plate assays. Tests using laboratory scale pipeline simulators continued. Preliminary results showed that the natural extracts possess strong antimicrobial activity being comparable to or even better than the pure compounds tested against strains of sulfate reducers. Their minimum inhibitory concentrations had been determined. It was also found that they possess bactericidal properties at minimal concentrations. Biofilm dissociation activity as assessed by microtiter plate assays demonstrated varying degrees of differences between the treated and untreated group with the superior performance of the extracts over pure compounds. Such is an indication of the possible benefits that could be obtained from these natural products. Confirmatory experiments are underway.

  10. ENVIRONMENTAL BENIGN MITIGATION OF MICROBIOLOGICALLY INFLUENCED CORROSION (MIC)

    SciTech Connect

    J.R. Paterek; G. Husmillo

    2002-11-01

    The overall program objective is to develop and evaluate environmental benign agents or products that are effective in the prevention, inhibition, and mitigation of microbially influenced corrosion (MIC) in the internal surfaces of metallic natural gas pipelines. The goal is one or more environmental benign, a.k.a. ''green'' products that can be applied to maintain the structure and dependability of the natural gas infrastructure. The technical approach for this quarter were monitoring the development of Desulfovibrio species biofilm using the continuous flow cell system, evaluation of pepper compounds by microtiter plate assay for mitigating and inhibiting biofilm formation, and testing the effective concentrations to verify the extent of corrosion on metal coupons. Biofilm formation of Desulfovibrio vulgaris and D. desulfuricans was monitored and documented over a 7-day period. The use of a continuous flow cell system proved to be efficient and non-destructive in studying biofilm growth. Live/Dead BacLight was an efficient stain to determine cell viability. The extracts showed 9-25% biofilm formation inhibition against the two organisms, and 18-19% activity in detaching the already formed biofilm. Preliminary data were obtained on the extent of corrosion of metal coupons when treated with pepper extracts as against the untreated ones. Confirmatory tests are underway. A presentation was prepared and give at the US DOE NETL meeting on gas and petroleum infrastructure. The presentation is include as an addition to this report.

  11. ENVIRONMENTAL BENIGN MITIGATION OF MICROBIOLOGICALLY INFLUENCED CORROSION (MIC)

    SciTech Connect

    J.R. Paterek; G. Husmillo; V. Trbovic

    2003-01-01

    The overall program objective is to develop and evaluate environmental benign agents or products that are effective in the prevention, inhibition, and mitigation of microbially influenced corrosion (MIC) in the internal surfaces of metallic natural gas pipelines. The goal is one or more environmental benign, a.k.a. ''green'' products that can be applied to maintain the structure and dependability of the natural gas infrastructure. The technical approach for this quarter were isolation and cultivation of MIC-causing microorganisms from corroded pipeline samples, optimizing parameters in the laboratory-scale corrosion test loop system and testing the effective concentrations of Capsicum sp. extracts to verify the extent of corrosion on metal coupons by batch culture method. A total of 22 strains from the group of heterotrophic, acid producing, denitrifying and sulfate reducing bacteria were isolated from the gas pipeline samples obtained from Northern Indiana Public Service Company in Trenton, Indiana. They were purified and will be sent out for identification. Bacterial strains of interest were used in antimicrobial screenings and test loop experiments. Parameters for the laboratory-scale test loop system such as gas and culture medium flow rate; temperature; inoculation period; and length of incubation were established. Batch culture corrosion study against Desulfovibrio vulgaris showed that one (S{sub 1}M) out of the four Capsicum sp. extracts tested was effective in controlling the corrosion rate in metal coupons by 33.33% when compared to the untreated group.

  12. Chemical and microbiological experimentation for development of environmental control and life support systems

    NASA Technical Reports Server (NTRS)

    Whitman, G. A.; Wilson, M. E.; Cole, H. E.; Traweek, M.

    1992-01-01

    Microbiological techniques are under study with a view to the identification of viable microorganisms in liquid cultures, improve the identification of stressed organisms, and determine the biocidal activity of iodine and other chemicals on isolates from recycled water. A quality-assurance program has been implemented to validate data employed in making decisions concerning engineering and human health and safety. Analytical laboratory refinements will strongly aid the development of environmental control and life-support systems.

  13. ENVIRONMENTALLY BENIGN MITIGATION OF MICROBIOLOGICALLY INFLUENCED CORROSION (MIC)

    SciTech Connect

    J. Robert Paterek; Gemma Husmillo; Amrutha Daram; Vesna Trbovic; Teri Storino

    2003-04-01

    The overall program objective is to develop and evaluate environmentally benign agents or products that are effective in the prevention, inhibition, and mitigation of microbially influenced corrosion (MIC) in the internal surfaces of metallic natural gas pipelines. The goal is to develop one or more environmentally benign (a.k.a. ''green'') products that can be applied to maintain the structure and dependability of the natural gas infrastructure. The technical approach for this quarter includes the application of new methods of Capsicum sp. (pepper) extraction by soxhlet method and analysis of a new set of extracts by thin layer chromatography (TLC) and high performance liquid chromatography (HPLC); isolation and cultivation of MIC-causing microorganisms from corroded pipeline samples; and evaluation of antimicrobial activities of the old set of pepper extracts in comparison with major components of known biocides and corrosion inhibitors. Twelve new extracts from three varieties of Capsicum sp. (Serrano, Habanero, and Chile de Arbol) were obtained by soxhlet extraction using 4 different solvents. Results of TLC done on these extracts showed the presence of capsaicin and some phenolic compounds, while that of HPLC detected capsaicin and dihydrocapsaicin peaks. More tests will be done to determine specific components. Additional isolates from the group of heterotrophic, acid-producing, denitrifying and sulfate-reducing bacteria were obtained from the pipeline samples submitted by gas companies. Isolates of interest will be used in subsequent antimicrobial testing and test-loop simulation system experiments. Results of antimicrobial screening of Capsicum sp. extracts and components of known commercial biocides showed comparable activities when tested against two strains of sulfate-reducing bacteria.

  14. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates.

  15. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.

    1990-09-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at the Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The TSP is composed of experts in numerous technical fields related to this project and represents the interests of the public. The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms, environmental transport, environmental monitoring data, demographics, agriculture, food habits, environmental pathways and dose estimates. 3 figs.

  16. Medical microbiological analysis of Apollo-Soyuz test project crewmembers

    NASA Technical Reports Server (NTRS)

    Taylor, G. R.; Zaloguev, S. N.

    1976-01-01

    The procedures and results of the Microbial Exchange Experiment (AR-002) of the Apollo-Soyuz Test Project are described. Included in the discussion of procedural aspects are methods and materials, in-flight microbial specimen collection, and preliminary analysis of microbial specimens. Medically important microorganisms recovered from both Apollo and Soyuz crewmen are evaluated.

  17. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1991-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon and Washington, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on human (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data; Demographics, Agriculture, Food Habits and; Environmental Pathways and Dose Estimates.

  18. Environmental Assessment Lakeview Geothermal Project

    SciTech Connect

    Treis, Tania

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  19. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed.

  20. 2001 Gordon Research Conference on Applied and Environmental Microbiology. Final progress report [agenda and attendee list

    SciTech Connect

    Drake, Harold

    2001-07-26

    The Gordon Research Conference on Applied and Environmental Microbiology was held at Connecticut College, New London, Connecticut, July 22-27, 2001. The conference was attended by 121 participants. The attendees represented the spectrum of endeavor in this field, coming from academia, industry, and government laboratories, and included US and foreign scientists, senior researchers, young investigators, and students. Emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate discussion about the key issues in the field today. Session topics included the following: Environmental and applied genomics, Cell-to-cell signaling and multicellular behavior, Emerging technologies and methods, Novel metabolisms and ecosystems, Directed evolution of enzymes and pathways, Symbiotic and trophic relationships, Synthesis and application of novel biopolymers, and Microbes at the oxic-anoxic interface. There was also a special lecture titled ''Under the umbrella of the big tree: microbial biology into the 21st century.''

  1. The EMPACT Beaches Project Results from a Study on Microbiological Monitoring in Recreational Waters

    EPA Science Inventory

    The EMPACT (Environmental Monitoring for Public Access and Community Tracking) Beaches project has attempted to define which characteristics are most signifi cant with regard to monitoring approaches. This project examined five beach environments to determine the factors that mos...

  2. Aquatic Microbiology Laboratory Manual.

    ERIC Educational Resources Information Center

    Cooper, Robert C.; And Others

    This laboratory manual presents information and techniques dealing with aquatic microbiology as it relates to environmental health science, sanitary engineering, and environmental microbiology. The contents are divided into three categories: (1) ecological and physiological considerations; (2) public health aspects; and (3)microbiology of water…

  3. Project environmental microbiology as related to planetary quarantine

    NASA Technical Reports Server (NTRS)

    Pflug, I. J.

    1973-01-01

    The viability and dry heat resistance of indigenous microflora associated with small soil particles were investigated. An aluminum boat TDT CUP-TSA solid media system was developed for the analyses; a complete description of the technique is included. Data cited here were obtained using analyses of individual soil particles. Detailed particle viability profiles for dry heat effects were determined for Kennedy Space Center soil. At 110 C at least some particles retained viability through a heating period of between 8 and 16 hours. Single particles heated at 125 C for 80 minutes or longer did not show evidence of viability under test conditions. Preliminary aerobic, mesophilic plate counts of the 74-88 micron m soil fraction yielded mean values of 16.2 organisms per dark particle and 2.6 organisms per light particle. Heat treatment of particles in a dry atmosphere did not appear to increase the rate of inactivation for in situ soil particle microflora.

  4. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S. M.; McMakin, A. H.

    1991-09-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation dose that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into five technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (i.e., dose estimates). The Source Terms Task develops estimates of radioactive emissions from Hanford facilities since 1944. The Environmental Transport Task reconstructs the movements of radioactive particles from the areas of release to populations. The Environmental Monitoring Data Task assemblies, evaluates and reports historical environmental monitoring data. The Demographics, Agriculture and Food Habits Task develops the data needed to identify the populations that could have been affected by the releases. The Environmental Pathways and Dose Estimates Task used the information derived from the other Tasks to estimate the radiation doses individuals could have received from Hanford radiation. This document lists the progress on this project as of September 1991. 3 figs., 2 tabs.

  5. Estimation of the environmental risk posed by landfills using chemical, microbiological and ecotoxicological testing of leachates.

    PubMed

    Matejczyk, Marek; Płaza, Grażyna A; Nałęcz-Jawecki, Grzegorz; Ulfig, Krzysztof; Markowska-Szczupak, Agata

    2011-02-01

    The leachates from 22 municipal solid waste (MSW) landfill sites in Southern Poland were characterized by evaluation of chemical, microbiological and ecotoxicological parameters. Chemical analyses were mainly focused on the identification of the priority hazardous substances according to Directive on Priority Substances, 2008/105/EC (a daughter directive of the WFD) in leachates. As showed, only five substances (Cd, Hg, hexachlorobutadiene, pentachlorobenzene and PAHs) were detected in the leachates. The compounds tested were absent or present at very low concentrations. Among them, only PAHs were found in all samples in the range from 0.057 to 77.2 μg L⁻¹. The leachates were contaminated with bacteria, including aerobic, psychrophilic and mesophilic bacteria, coliform and fecal coliforms, and spore-forming-bacteria, including Clostridium perfringens, and with filamentous fungi. From the analysis of specific microorganism groups (indicators of environmental pollution by pathogenic or opportunistic pathogenic organisms) it can be concluded that the landfill leachates showed sanitary and epidemiological hazard. In the ecotoxicological study, a battery of tests comprised of 5 bioassays, i.e. Microtox(®), Spirotox, Rotoxkit F™, Thamnotoxkit F™ and Daphtoxkit F™ magna was applied. The leachate samples were classified as toxic in 13.6%, highly toxic in 54.6% and very highly toxic in 31.8%. The Spirotox test was the most sensitive bioassay used. The percentage of class weight score was very high - above 60%; these samples could definitely be considered seriously hazardous and acutely toxic to the fauna and microflora. No correlations were found between the toxicity values and chemical parameters. The toxicity of leachate samples cannot be explained by low levels of the priority pollutants. It seems that other kinds of xenobiotics present in the samples at subacute levels gave the high aggregate toxic effect. The chemical, ecotoxicological and microbiological

  6. Environmental Noise: An Undergraduate Research Project

    ERIC Educational Resources Information Center

    Mahajan, Sukhbir; And Others

    1977-01-01

    Describes an undergraduate project of measuring environmental noise. Includes a discussion of current methodologies used in environmental noise assessment and the usefulness of projects which involve the physics profession with local governmental agencies and the community. (SL)

  7. Environmental mitigation at hydroelectric projects

    SciTech Connect

    Sale, M.J.; Cada, G.F.; Chang, L.H.; Christensen, S.W.; Railsback, S.F. ); Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. )

    1991-12-01

    Current environmental mitigation practices at nonfederal hydropower projects were analyzed. Information about instream flows, dissolved oxygen (DO) mitigation, and upstream and downstream fish passage facilities was obtained from project operators, regulatory and resource agencies, and literature reviews. Information provided by the operators includes the specific mitigation requirements imposed on each project, specific objectives or purposes of mitigation, mitigation measures chosen to meet the requirement, the kinds of post-project monitoring conducted, and the costs of mitigation. Costs are examined for each of the four mitigation methods, segmented by capital, study, operations and maintenance, and annual reporting costs. Major findings of the study include: the dominant role of the Instream Flow Incremental Methodology, in conjunction with professional judgment by agency biologists, to set instream flow requirements; reliance on spill flows for DO enhancement; and the widespread use of angled bar racks for downstream fish protection. All of these measures can have high costs and, with few exceptions, there are few data available from nonfederal hydropower projects with which to judge their effectiveness. 100 refs.

  8. Microbiological investigations

    NASA Technical Reports Server (NTRS)

    Ferguson, J. K.; Taylor, G. R.; Mieszkuc, B. J.

    1975-01-01

    The crew microbiology program was conducted to evaluate lunar contamination, to detect potentially pathogenic microoganisms, to identify medically important microorganisms recovered from ill crewmen, to aid in diagnosis and treatment, and to collect microbiological data that would aid in elucidating the response of the crew microbial autoflora to the space flight environment and in evaluating the resultant effect on the crewmember. Microbiological sampling of selected sites in the command module was initiated in support of the quarantine program. During lunar quarantine missions, microbial screening was accomplished for all support personnel to be isolated with the returning crewman. Virology support for the Apollo project consisted of characterization of the viral and mycoplasma flora of the crewmembers and performance of viral serology for crewmembers, crew contacts, and key mission personnel. Procedures and results are discussed in detail.

  9. The Environmental Education through Filmmaking Project

    ERIC Educational Resources Information Center

    Harness, Hallie; Drossman, Howard

    2011-01-01

    The environmental education through filmmaking project, a case study at an alternative US public high school, investigates environmental literacies of "at-risk" students who produced two short documentary films, one on recycling and one on water conservation. The filmmaking project sought to promote students' awareness of environmental issues and…

  10. Environmental assessment: The Eden project

    NASA Astrophysics Data System (ADS)

    Roza, Christodoulaki

    Non domestic buildings account for about one-sixth of the U.K.'s entire C02 emissions and one-third of the building related ones 2 . Their proportion of energy consumption, particularly electricity, has also been growing 2 . New buildings are not necessarily better, with energy use often proving to be much higher than their designers anticipated 2 . Annual C02 emissions of two- and sometimes three- times design expectations are far from unusual, leaving a massive credibility gap 2 . These and other global environmental and human health related concerns have motivated an increasing number of designers, developers and building users to pursue more environmentally sustainable designs and construction strategies 5 . However, these buildings can be difficult to evaluate, since they are large in scale, complex in materials and function and temporally dynamic due to limited service life of building components and changing user requirements 5 . All of these factors make environmental assessment of the buildings challenging. Previous Post Occupancy Review of Buildings and their Engineering (PROBE) building investigations have uncovered serious shortcomings in facilities management, or at least mismatches between a building's management needs and the ability of the occupiers to provide the right level of management 1 . Consequently, large differences between energy performance expectations and outcomes can occur virtually unnoticed, while designers continue to repeat flawed descriptions 2 . This investigation attempts to evaluate the building's operation and to help achieving demonstrable improvements in terms of energy efficiency and occupant satisfaction. The scope of this study is to evaluate the actual environmental performance of a building notable for its advanced design. The Education Resource Centre at the Eden Project was selected to compare design expectations with post occupancy performance. This report contains a small-scale survey of user satisfaction with the

  11. Hanford Environmental Dose Reconstruction Project. Monthly report

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  12. Hanford Environmental Dose Reconstruction Project. Monthly report

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates.

  13. Hanford Environmental Dose Reconstruction Project monthly report

    SciTech Connect

    Finch, S.M.

    1991-10-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doeses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates.

  14. Hanford Environmental Dose Reconstruction Project. Monthly report

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-03-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  15. Hanford Environmental Dose Reconstruction Project. Monthly report

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-02-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates.

  16. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-03-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  17. Comparison of the microbiological quality of environmentally friendly and conventionally grown vegetables sold at retail markets in Korea.

    PubMed

    Ryu, Jee-Hoon; Kim, Minju; Kim, Eun-Gyeong; Beuchat, Larry R; Kim, Hoikyung

    2014-09-01

    Fresh produce is usually eaten raw without cooking or heating, which may increase the probability of foodborne infection. The microbiological quality of 11 types of fresh, raw vegetables (romaine lettuce, sesame leaves, crown daisy, garlic chives, iceberg lettuce, cabbage, broccoli, leek, chili pepper, capsicum, and zucchini) purchased at retail markets in Iksan, Korea as affected by cultivation method (environmentally friendly vegetables [organic, pesticide-free, and low-pesticide vegetables] and conventionally grown vegetables) and harvest season was determined. Escherichia coli O157:H7 and Salmonella were not detected in all samples of vegetables tested. Aerobic mesophiles (>6 log cfu/g) were detected in environmentally friendly romaine lettuce and crown daisy and environmentally friendly and conventionally grown garlic chives, which also contained coliforms (>3 log cfu/g). Sesame leaf and crown daisy (regardless of cultivation method), as well as conventionally grown romaine lettuce and leek, contained >1 log cfu/g of E. coli. The overall microbiological quality of environmentally friendly and conventionally grown vegetables was not significantly different (P > 0.05). However, there were seasonal effects on populations of coliforms and generic E. coli on vegetables. The greatest numbers of microorganisms were isolated from environmentally friendly or conventionally grown vegetables purchased in winter. The vegetables, regardless of cultivation method or season, should be subjected to appropriate antimicrobial treatment to enhance their microbial safety. PMID:25124136

  18. Individuality, phenotypic differentiation, dormancy and ‘persistence’ in culturable bacterial systems: commonalities shared by environmental, laboratory, and clinical microbiology

    PubMed Central

    Kell, Douglas; Potgieter, Marnie; Pretorius, Etheresia

    2015-01-01

    For bacteria, replication mainly involves growth by binary fission. However, in a very great many natural environments there are examples of phenotypically dormant, non-growing cells that do not replicate immediately and that are phenotypically ‘nonculturable’ on media that normally admit their growth. They thereby evade detection by conventional culture-based methods. Such dormant cells may also be observed in laboratory cultures and in clinical microbiology. They are usually more tolerant to stresses such as antibiotics, and in clinical microbiology they are typically referred to as ‘persisters’. Bacterial cultures necessarily share a great deal of relatedness, and inclusive fitness theory implies that there are conceptual evolutionary advantages in trading a variation in growth rate against its mean, equivalent to hedging one’s bets. There is much evidence that bacteria exploit this strategy widely. We here bring together data that show the commonality of these phenomena across environmental, laboratory and clinical microbiology. Considerable evidence, using methods similar to those common in environmental microbiology, now suggests that many supposedly non-communicable, chronic and inflammatory diseases are exacerbated (if not indeed largely caused) by the presence of dormant or persistent bacteria (the ability of whose components to cause inflammation is well known). This dormancy (and resuscitation therefrom) often reflects the extent of the availability of free iron. Together, these phenomena can provide a ready explanation for the continuing inflammation common to such chronic diseases and its correlation with iron dysregulation. This implies that measures designed to assess and to inhibit or remove such organisms (or their access to iron) might be of much therapeutic benefit. PMID:26629334

  19. Careers in Microbiology...Horizons Unlimited

    ERIC Educational Resources Information Center

    Goldschmidt Millicent C.; Whitt, Dixie

    1978-01-01

    A broad range of present microbiological work is discussed in order to indicate the many possible careers now open in microbiology. Some areas are immunology, environmental microbiology, agricultural, industrial, and food microbiology, and space microbiology. An employment outlook is also given. (MDR)

  20. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.

    1990-10-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at the Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The TSP is composed of experts in numerous technical fields related to this project and represents the interests of the public. The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms, environmental transport, environmental monitoring data, demographics, agriculture, food habits, and environmental pathways and dose estimates. 3 figs., 3 tabs.

  1. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.

    1990-05-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The TSP is composed of experts in numerous technical fields related to this project and represents the interests of the public. The US Department of Energy (DOE) funds the project. The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks address each of the primary steps in the path from radioactive releases to dose estimates source terms, environmental transport, environmental monitoring data, demographics, agriculture, and food habits, and environmental pathways and dose estimates.

  2. Environmental projects. Volume 7: Environmental resources document

    NASA Technical Reports Server (NTRS)

    Kushner, Len; Kroll, Glenn

    1988-01-01

    The Goldstone Deep Space Communications Complex (GDSCC) in Barstow, California, is part of the NASA Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Goldstone is managed, directed and operated by the Jet Propulsion Laboratory of Pasadena, California. The GDSCC includes five distinct operational sites: Echo, Venus, Mars, Apollo, and Mojave Base. Within each site is a Deep Space Station (DPS), consisting of a large dish antenna and its support facilities. As required by NASA directives concerning the implementation of the National Environmental Policy Act, each NASA field installation is to publish an Environmental Resources Document describing the current environment at the installation, including any adverse effects that NASA operations may have on the local environment.

  3. Hanford Environmental Dose Reconstruction Project monthly report

    SciTech Connect

    Finch, S.M.

    1990-12-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have been have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 3 tabs.

  4. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.

    1990-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics; agriculture; food habits; and environmental pathways and dose estimates. 3 figs.

  5. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Dennis, B.S.

    1990-04-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks address each of the primary steps in the path from radioactive releases to dose estimates: source terms, environmental transport, environmental monitoring data, demographics, agriculture, and food habits, and environmental pathways and dose estimates. The source terms task will develop estimates for radioactive emissions from Hanford facilities since 1944. These estimates will be based on historical measurements and production information. 1 fig., 1 tab.

  6. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.

    1990-06-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The TSP is composed of experts in numerous technical fields related to this project and represents the interests of the public. The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is divided into technical tasks which address each of the primary steps in the path from radioactive releases to dose estimates: source terms, environmental transport, environmental monitoring data, demographics, agriculture, and food habits, and environmental pathways and dose estimates.

  7. Environmental projects. Volume 3: Environmental compliance audit

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Goldstone Deep Space Communications Complex is part of NASA's Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Activities at Goldstone are carried out in support of six large parabolic dish antennas. In support of the national goal of the preservation of the environment and the protection of human health and safety, NASA, JPL and Goldstone have adopted a position that their operating installations shall maintain a high level of compliance with Federal, state, and local laws governing the management of hazardous substances, abestos, and underground storage tanks. A JPL version of a document prepared as an environmental audit of Goldstone operations is presented. Both general and specific items of noncompliance at Goldstone are identified and recommendations are provided for corrective actions.

  8. Environmental Education Study Projects for College Students.

    ERIC Educational Resources Information Center

    Wert, Jonathan M.

    This publication concerns three environmental education study projects designed to help the college instructor, student, or group of students in identifying environmental problems at the community level and helping to find solutions to them. It discusses the need for and use of environmental problem solving and includes some factors involved with…

  9. The Mediterranean non-indigenous ascidian Polyandrocarpa zorritensis: Microbiological accumulation capability and environmental implications.

    PubMed

    Stabili, Loredana; Licciano, Margherita; Longo, Caterina; Lezzi, Marco; Giangrande, Adriana

    2015-12-15

    We investigated the bacterial accumulation and digestion capability of Polyandrocarpa zorritensis, a non-indigenous colonial ascidian originally described in Peru and later found in the Mediterranean. Microbiological analyses were carried out on homogenates from "unstarved" and "starved" ascidians and seawater from the same sampling site (Adriatic Sea, Italy). Culturable heterotrophic bacteria (22 °C), total culturable bacteria (37 °C) and vibrios abundances were determined on Marine Agar 2216, Plate Count Agar and TCBS Agar, respectively. Microbial pollution indicators were measured by the most probable number method. All the examined microbiological groups were accumulated by ascidians but differently digested. An interesting outcome is the capability of P. zorritensis to digest allochthonous microorganisms such as coliforms as well as culturable bacteria at 37 °C, counteracting the effects of microbial pollution. Thus, the potential exploitation of these filter feeders to restore polluted seawater should be taken into consideration in the management of this alien species. PMID:26561443

  10. Taiwanese students' scientific attitudes, environmental perceptions, self-efficacy, and achievement in microbiology courses

    NASA Astrophysics Data System (ADS)

    Lee, Jing-Jin

    One of the important aims of science education is to teach science for every one and to create scientifically literate citizens. In order to become more cognizant of students in the science classroom to better prepare students for an increasingly complex modern society, the study assessed students' science attitudes, science laboratory environment perceptions, self-efficacy in microbiology, and achievement to determine the differences based on gender, knowledge background, enrollment status, and the duration of learning background. Also, the relationships among students' scientific attitudes, perceptions of science laboratory environment, self-efficacy, and achievement were explored. The population for this study included 442 students who took microbiology course at CHCMT in Taiwan. The instruments for data collecting include scientific attitudes inventory, laboratory environment inventory, and self-efficacy inventory for microbiology. A series of t tests and one-way ANOVA, correlation, multiply regression, and path analysis are conducted for data analysis. The results reveal that students' scientific attitude is the only significant factor that affects attitudes. Students' perceptions of the laboratory environment first influenced self-efficacy and attitudes, and then affected achievement. Gender influences students' perceptions of the laboratory environment and self-efficacy. Knowledge background can cause differences in students' scientific attitudes. The duration of students' learning in science can influence students' perceptions of the laboratory environment and achievement. Enrollment status makes a difference in students' scientific attitudes, laboratory environment perceptions, and achievement.

  11. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  12. Environmental Control Unit Harness Project

    NASA Technical Reports Server (NTRS)

    Oliva-Buisson, Yvette J.

    2014-01-01

    Testing four new Environmental Control Unit Harnesses for improved user comfort during SCAPE operations. Phase I, testing in a lab environment, Phase II will continue testing the best candidates in a field environment.

  13. School Yard Environmental Projects: A Planning Primer.

    ERIC Educational Resources Information Center

    Megalos, Mark A.; And Others

    This guide describes how to establish successful trails, outdoor classrooms, or other environmental education improvements on rural and urban school grounds. Teachers are encouraged to promote the environmental project as a solution to an existing problem and to include all parties and stakeholders that can benefit from a coordinated environmental…

  14. Non-linearities in hydrological connectivity and microbiological flux in nested catchments - implications of environmental change

    NASA Astrophysics Data System (ADS)

    Tetzlaff, D.; Soulsby, C.; Birkel, C.; Capell, R.; Speed, M.

    2009-12-01

    The non-linearities of catchment hydrological behaviour are strongly influenced by the connectivity of hillslopes and channel networks, particularly where overland flow is an important runoff mechanism. Such surface connectivity also controls the flux of microbiological pollutants (coliform bacteria) from areas of live stock grazing which can have serious health implications for potable water supplies. We report a nested catchment study where hydrological and tracer monitoring over a two year period has been coupled with regular sampling for faecal indicator organisms (FIOs). The study has been based in catchments with mixed landuse where FIOs are derived from livestock (sheep and cows) in agricultural land and wild animals (red deer) on moorlands. At all scales (3-1800km2), high levels of FIO were transient and episodic and strongly correlated with periods of high hydrological connectivity. We show how this non-linearity in connectivity can be captured within a dynamic hydrological model. The model was used, along with climate change predictions, to assess possible scenarios of change in connectivity and microbiological contamination in catchments with different land use.

  15. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect

    POWELL, P.A.

    2000-03-29

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  16. Integrating TQM into environmental restoration projects

    SciTech Connect

    Caldwell, J.A.

    1992-12-31

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy`s Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review.

  17. Hanford Environmental Dose Reconstruction Project. Monthly report

    SciTech Connect

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed.

  18. [Microbiological quality of indoor air at the School of Building and Environmental Engineering at Białystok University of Technology].

    PubMed

    Butarewicz, Andrzej

    2005-01-01

    The investigation of microbiological rate of indoor air pollution on Faculty of Building and Environmental Engineering at Białystok University of Technology were made by sedimentation method in accordance with Polish standards (PN-89/Z-04111/01,02,03). Six series of measurements were carried out from autumn 2002 to spring 2003. The results show bad microbiological quality of indoor air on Faculty of Building and Environmental Engineering at Białystok University of Technology. It was found that the number of Staphylococcus, Actinomycetales as well as the total count of bacteria were too high and broke the Polish regulations of the clear air. Because of the students' and other workers' safety, monitoring of microbiological pollution of the indoor air must be done and existing emergency to improve the quality of the air must be lead. PMID:16252812

  19. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Not Available

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  20. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.

    1991-02-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon and Washington, cultural and technical experts nominated by the regional Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. Project reports and references used in the reports are made available to the public in a public reading room. Project progress is documented in this monthly report, which is available to the public. 3 figs., 3 tabs.

  1. Wastewater reuse in irrigation: a microbiological perspective on implications in soil fertility and human and environmental health.

    PubMed

    Becerra-Castro, Cristina; Lopes, Ana Rita; Vaz-Moreira, Ivone; Silva, Elisabete F; Manaia, Célia M; Nunes, Olga C

    2015-02-01

    The reuse of treated wastewater, in particular for irrigation, is an increasingly common practice, encouraged by governments and official entities worldwide. Irrigation with wastewater may have implications at two different levels: alter the physicochemical and microbiological properties of the soil and/or introduce and contribute to the accumulation of chemical and biological contaminants in soil. The first may affect soil productivity and fertility; the second may pose serious risks to the human and environmental health. The sustainable wastewater reuse in agriculture should prevent both types of effects, requiring a holistic and integrated risk assessment. In this article we critically review possible effects of irrigation with treated wastewater, with special emphasis on soil microbiota. The maintenance of a rich and diversified autochthonous soil microbiota and the use of treated wastewater with minimal levels of potential soil contaminants are proposed as sine qua non conditions to achieve a sustainable wastewater reuse for irrigation. PMID:25461421

  2. Comparative study of airborne viable particles assessment methods in microbiological environmental monitoring.

    PubMed

    Temprano, G; Garrido, D; Daquino, M

    2004-01-01

    A comparative study was done among available assessment methods to measure airborne viable particles in controlled rooms. Active methods were compared (sieve/nozzle impactor, slit-to-agar, centrifugal, filtration, and impinger). The comparative study was carried out by means of a two-way (factors: day and method) analysis of variance, after to logarithmical transformation of experimental results in order to fulfill the normality test of the variables. Statistically significant differences were found among the results of the five methods (P < 0.0001). In a post hoc study, by means of Tukey's test, no differences were found among centrifugal, filtration, and impinger methods. Differences were found among all the other methods (P < 0.05). It is concluded that centrifugal, filtration, and impinger methods (in which numerical results were higher than in the others) may be the most suitable methods for microbiological monitoring of a clean room. The mean results among the three selected active methods were compared with results on the settle plate (SP) (the passive method). A relationship was established between results of the passive method (CFU/h/plate 90 mmø) and the results of active methods (CFU/m3 air). By means of a lineal regression study, it was obtained a relation factor of 22.7; (95% CI: 19.7, 25.7). This factor is only valid for values between 3 and 16 in CFU/h/plate 90 mmø, and it is put on record that the experimental study took place in a room that fulfills Class D clean room specifications (WHO standards) in microbiological terms. PMID:15368991

  3. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  4. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  5. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Dennis, B.S.

    1990-02-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is divided into technical tasks which address each of the primary steps in the path from radioactive releases to dose estimates. Included are source terms, environmental transport, environmental monitoring data, demographics, agriculture, and food habits, and environmental pathways and dose estimates. The source terms task will develop estimates of radioactive emissions from Hanford facilities since 1944. The environmental transport task will reconstruct the movement of radioactive materials from the areas of release to populations via the atmosphere, surface water, and ground water. The environmental monitoring task will assemble, evaluate, and report historical environmental monitoring data. The demographics, agriculture, and food habits task will develop the data needed to determine the populations that could have been affected by the releases. Population and demographic information will be developed for the general population within the study area. In addition to population and demographic data, the food and water consumption patterns and sources of food and water for these populations must be estimated since these provide a primary pathway for the intake of radionuclides. The environmental pathways and dose estimates task will use the information produced by the other tasks to estimate the radiation doses populations could have received from Hanford. 1 tab., 1 fig.

  6. Hanford Environmental Dose Reconstruction Project monthly report

    SciTech Connect

    McMakin, A.H., Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction MDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in envirorunental pathways. epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering. radiation dosimetry. and cultural anthropology. Included are appointed members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates.

  7. Rapid Electrochemical Detection and Identification of Microbiological and Chemical Contaminants for Manned Spaceflight Project

    NASA Technical Reports Server (NTRS)

    Pierson, Duane; Botkin, Douglas; Gazda, Daniel

    2014-01-01

    Microbial control in the spacecraft environment is a daunting task, especially in the presence of human crew members. Currently, assessing the potential crew health risk associated with a microbial contamination event requires return of representative environmental samples that are analyzed in a ground-based laboratory. It is therefore not currently possible to quickly identify microbes during spaceflight. This project addresses the unmet need for spaceflight-compatible microbial identification technology. The electrochemical detection and identification platform is expected to provide a sensitive, specific, and rapid sample-to-answer capability for in-flight microbial monitoring that can distinguish between related microorganisms (pathogens and non-pathogens) as well as chemical contaminants. This will dramatically enhance our ability to monitor the spacecraft environment and the health risk to the crew. Further, the project is expected to eliminate the need for sample return while significantly reducing crew time required for detection of multiple targets. Initial work will focus on the optimization of bacterial detection and identification. The platform is designed to release nucleic acids (DNA and RNA) from microorganisms without the use of harmful chemicals. Bacterial DNA or RNA is captured by bacteria-specific probe molecules that are bound to a microelectrode, and that capture event can generate a small change in the electrical current (Lam, et al. 2012. Anal. Chem. 84(1): 21-5.). This current is measured, and a determination is made whether a given microbe is present in the sample analyzed. Chemical detection can be accomplished by directly applying a sample to the microelectrode and measuring the resulting current change. This rapid microbial and chemical detection device is designed to be a low-cost, low-power platform anticipated to be operated independently of an external power source, characteristics optimal for manned spaceflight and areas where power

  8. 1995 project of the year Hanford Environmental compliance project nomination

    SciTech Connect

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  9. 15 CFR 291.2 - Environmental integration projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... environmental issues; and the extent of environmentally related information and expert resources which will be... 15 Commerce and Foreign Trade 1 2012-01-01 2012-01-01 false Environmental integration projects... MANUFACTURING EXTENSION PARTNERSHIP; ENVIRONMENTAL PROJECTS § 291.2 Environmental integration projects....

  10. 15 CFR 291.2 - Environmental integration projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... environmental issues; and the extent of environmentally related information and expert resources which will be... 15 Commerce and Foreign Trade 1 2014-01-01 2014-01-01 false Environmental integration projects... MANUFACTURING EXTENSION PARTNERSHIP; ENVIRONMENTAL PROJECTS § 291.2 Environmental integration projects....

  11. 15 CFR 291.2 - Environmental integration projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... environmental issues; and the extent of environmentally related information and expert resources which will be... 15 Commerce and Foreign Trade 1 2013-01-01 2013-01-01 false Environmental integration projects... MANUFACTURING EXTENSION PARTNERSHIP; ENVIRONMENTAL PROJECTS § 291.2 Environmental integration projects....

  12. A simple microbiological tool to evaluate the effect of environmental health interventions on hand contamination.

    PubMed

    Devamani, Carol; Norman, Guy; Schmidt, Wolf-Peter

    2014-11-01

    The effects of interventions such as sanitation or hand hygiene on hand contamination are difficult to evaluate. We explored the ability of a simple microbiological test to: (1) detect recontamination after handwashing; (2) reflect risk factors for microbial contamination and (3) be applicable to large populations. The study was done in rural Andhra Pradesh, India, and Maputo, Mozambique. Participants placed all 10 fingertips on a chromogenic agar that stains Enterococcus spp. and E. coli spp. Outcomes were the number of colonies and the number of fingertips with colonies. In the recontamination study, participants were randomised to handwashing with soap and no handwashing, and tested at 30 min intervals afterwards. In two cross sectional studies, risk factors for hand contamination were explored. Recontamination of hands after washing with soap was fast, with baseline levels reached after 1 h. Child care was associated with higher Enterococcus spp. counts, whereas agricultural activities increased E. coli spp. counts. Food preparation was associated with higher counts for both organisms. In Maputo, counts were not strongly associated with water access, latrine type, education or diarrhoea. The method seems unsuitable for the evaluation of handwashing promotion. It may reflect immediately preceding risk practices but not household-level risk factors. PMID:25407420

  13. A Simple Microbiological Tool to Evaluate the Effect of Environmental Health Interventions on Hand Contamination

    PubMed Central

    Devamani, Carol; Norman, Guy; Schmidt, Wolf-Peter

    2014-01-01

    The effects of interventions such as sanitation or hand hygiene on hand contamination are difficult to evaluate. We explored the ability of a simple microbiological test to: (1) detect recontamination after handwashing; (2) reflect risk factors for microbial contamination and (3) be applicable to large populations. The study was done in rural Andhra Pradesh, India, and Maputo, Mozambique. Participants placed all 10 fingertips on a chromogenic agar that stains Enterococcus spp. and E. coli spp. Outcomes were the number of colonies and the number of fingertips with colonies. In the recontamination study, participants were randomised to handwashing with soap and no handwashing, and tested at 30 min intervals afterwards. In two cross sectional studies, risk factors for hand contamination were explored. Recontamination of hands after washing with soap was fast, with baseline levels reached after 1 h. Child care was associated with higher Enterococcus spp. counts, whereas agricultural activities increased E. coli spp. counts. Food preparation was associated with higher counts for both organisms. In Maputo, counts were not strongly associated with water access, latrine type, education or diarrhoea. The method seems unsuitable for the evaluation of handwashing promotion. It may reflect immediately preceding risk practices but not household-level risk factors. PMID:25407420

  14. 15 CFR 291.3 - Environmental tools and techniques projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... MANUFACTURING EXTENSION PARTNERSHIP; ENVIRONMENTAL PROJECTS § 291.3 Environmental tools and techniques projects... initial development and implementation of tools or techniques which will aide manufacturing extension..., manufacturing assessment tools, environmental benchmarking tools, training delivery programs,...

  15. Environmental Assessment : Happy Valley [Substation Project].

    SciTech Connect

    United States. Bonneville Power Administration.

    1982-05-01

    The proposed Happy Valley project consists of construction of a new BPA customer service 69-kV substation south of Sequim in Clallam County, Washington. A tie line, to be constructed by the customer as part of this project, will link the new BPA facility to the existing customer's transmission system in the area. This project responds to rapid load growth in the Olympic Peninsula, and will strengthen the existing BPA system and interconnected utility systems. It will reduce transmission losses presently incurred, especially on the BPA system supplying power to the Olympic Peninsula. This report describes the potential environmental impact of the proposed actions. 2 figs., 1 tab.

  16. NPOESS Preparatory Project (NPP) Environmental Products

    NASA Astrophysics Data System (ADS)

    Grant, K. D.; Smith, D. C.

    2011-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will contribute the afternoon orbit component and ground processing system of the restructured National Polar-orbiting Operational Environmental Satellite System (NPOESS). As such, the Joint Polar Satellite System replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the ground processing component of both POES and the Defense Meteorological Satellite Program (DMSP) replacement, known as the Defense Weather Satellite System (DWSS), managed by the Department of Defense (DoD). The Joint Polar Satellite System satellite will carry a suite of sensors designed to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground processing system for the Joint Polar Satellite System is known as the Common Ground System (JPSS CGS), and consists of a Command, Control, and Communications Segment (C3S) and the Interface Data Processing Segment (IDPS). Both are developed by Raytheon Intelligence and Information Systems (IIS). The Interface Data Processing Segment will process Joint Polar Satellite System and Defense Weather Satellite System satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to the National Oceanic and Atmospheric Administration and Department of Defense processing centers operated by the United States government. The Interface Data Processing Segment will process Environmental Data Records beginning with the NPOESS Preparatory Project (NPP) and continue through the lifetime of the Joint Polar Satellite System and Defense Weather Satellite System programs. Under the National Polar-orbiting Operational Environmental

  17. Workplace Environmental Literacy Project (WELP). Final Report.

    ERIC Educational Resources Information Center

    North Orange County Community Coll. District, Fullerton, CA.

    A project was conducted to determine formal and informal competencies based on an expanded definition of workplace environmental literacy. A secondary goal was to develop a compact between employers and training program graduates whereby graduates would have preferential access to employment opportunities. Issues that arose during the…

  18. Environmental Science Projects. LC Science Tracer Bullet.

    ERIC Educational Resources Information Center

    Carter, Constance, Comp.

    This bibliography cites sources to assist middle, junior, and senior high school students and teachers in planning, preparing, and executing science fair projects in the environmental sciences. In addition, a few books with experiments suitable for elementary grade students are included. The listing includes: (1) 5 introductory texts; (2) 31…

  19. Environmental Science Projects. LC Science Tracer Bullet.

    ERIC Educational Resources Information Center

    Carter, Constance, Comp.

    Sources to assist junior and senior high school students and teachers in planning, preparing, and executing science fair projects in the environmental sciences are cited in this bibliography that includes a few books with experiments suitable for elementary grade students. Information and/or citations are provided under the following headings: (1)…

  20. Mounds View Environmental Education Project, Report #1.

    ERIC Educational Resources Information Center

    Budde, Duane

    Prepared for the 1971 National Science Teachers Association (NSTA) Annual Meeting, this collection of ideas, activities, and unit plans from the Mounds View Environmental Education Project would be useful for junior and senior high school teachers and curriculum planners. Content includes: (1) a senior high course outline and daily lesson plans…

  1. Project Approval, Environmental Assessment and Public Participation.

    ERIC Educational Resources Information Center

    Elder, P. S.

    1982-01-01

    Presents a case study of a heavy oil project proposed by Esso Resources Canada Limited at Cold Lake, Alberta, Canada. Focuses on the approval process, environmental and social impact assessments, and public participation. Evaluates the case and makes recommendations concerning the approval process. (DC)

  2. Hanford Environmental Dose Reconstruction Project. Monthly report

    SciTech Connect

    Finch, S. M.; McMakin, A. H.

    1991-09-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation dose that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into five technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (i.e., dose estimates). The Source Terms Task develops estimates of radioactive emissions from Hanford facilities since 1944. The Environmental Transport Task reconstructs the movements of radioactive particles from the areas of release to populations. The Environmental Monitoring Data Task assemblies, evaluates and reports historical environmental monitoring data. The Demographics, Agriculture and Food Habits Task develops the data needed to identify the populations that could have been affected by the releases. The Environmental Pathways and Dose Estimates Task used the information derived from the other Tasks to estimate the radiation doses individuals could have received from Hanford radiation. This document lists the progress on this project as of September 1991. 3 figs., 2 tabs.

  3. 15 CFR 291.2 - Environmental integration projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... MANUFACTURING EXTENSION PARTNERSHIP; ENVIRONMENTAL PROJECTS § 291.2 Environmental integration projects. (a) Eligibility criteria. Eligible applicants for these projects are manufacturing extension centers or state... contracts with the NIST Manufacturing Extension Partnership. Only one proposal per organization...

  4. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  5. Microbiological Detection Systems for Molecular Analysis of Environmental Water and Soil Samples

    EPA Science Inventory

    Multiple detection systems are being targeted to track various species and genotypes of pathogens found in environmental samples with the overreaching goal of developing analytical separation and detection techniques for Salmonella enterica Serovars Typhi, Cryptosporidium parvum,...

  6. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    SciTech Connect

    Sebastian Puente

    1998-07-25

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics.

  7. Hanford environmental dose reconstruction project: Monthly report

    SciTech Connect

    Dennis, B.S.

    1989-02-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The Technical Steering Panel consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included among the members are appointed technical members representing the States of Oregon and Washington, cultural and technical experts nominated by the Indian tribes in the region, and an individual representing the public.

  8. A Project-Based Model for Professional Environmental Experience

    ERIC Educational Resources Information Center

    Meehan, Barry; Thomas, Ian

    2006-01-01

    The projects described in this article were designed to provide a real world situation akin to the work of environmental professionals. The projects were conducted with Australian students working on environmental issues in Vietnam. The projects demonstrated that multi-disciplinary teamwork fits well into environmental projects, and importantly…

  9. Promoting Student Investigation of Local Environmental Issues through the Southern Highlands Environmental Project: Project Report.

    ERIC Educational Resources Information Center

    Bousquet, Woodward S.

    This report of the Southern Highlands Environmental Project (SHEP) in North Carolina describes its initiation, needs assessment, teacher institute, classroom implementation, outcomes, and dissemination. The purpose of this project was to prepare and support Appalachian teachers in leading their students in investigations of local and regional…

  10. Antelope-Fossil Rebuild Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration`s (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower`s Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

  11. Antelope-Fossil Rebuild Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration's (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower's Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

  12. Salty Microbiology

    ERIC Educational Resources Information Center

    Schneegurt, Mark A.; Wedel, Adrianne N.; Pokorski, Edward W.

    2004-01-01

    Using microbiology activities in the classroom is an effective way for teachers to address National Standards in the life sciences. However, common microbiology activities that involve swabbing doorknobs and hands are too risky due to the likelihood of culturing human pathogens. In addition, making sterile media and maintaining sterile conditions…

  13. Proteomic tools for environmental microbiology--a roadmap from sample preparation to protein identification and quantification.

    PubMed

    Wöhlbrand, Lars; Trautwein, Kathleen; Rabus, Ralf

    2013-10-01

    The steadily increasing amount of (meta-)genomic sequence information of diverse organisms and habitats has a strong impact on research in microbial physiology and ecology. In-depth functional understanding of metabolic processes and overall physiological adaptation to environmental changes, however, requires application of proteomics, as the context specific proteome constitutes the true functional output of a cell. Considering the enormous structural and functional diversity of proteins, only rational combinations of various analytical approaches allow a holistic view on the overall state of the cell. Within the past decade, proteomic methods became increasingly accessible to microbiologists mainly due to the robustness of analytical methods (e.g. 2DE), and affordability of mass spectrometers and their relative ease of use. This review provides an overview on the complex portfolio of state-of-the-art proteomics and highlights the basic principles of key methods, ranging from sample preparation of laboratory or environmental samples, via protein/peptide separation (gel-based or gel-free) and different types of mass spectrometric protein/peptide analyses, to protein identification and abundance determination. PMID:23894077

  14. Single-stranded DNA phages: from early molecular biology tools to recent revolutions in environmental microbiology.

    PubMed

    Székely, Anna J; Breitbart, Mya

    2016-03-01

    Single-stranded DNA (ssDNA) phages are profoundly different from tailed phages in many aspects including the nature and size of their genome, virion size and morphology, mutation rate, involvement in horizontal gene transfer, infection dynamics and cell lysis mechanisms. Despite the importance of ssDNA phages as molecular biology tools and model systems, the environmental distribution and ecological roles of these phages have been largely unexplored. Viral metagenomics and other culture-independent viral diversity studies have recently challenged the perspective of tailed, double-stranded DNA (dsDNA) phages, dominance by demonstrating the prevalence of ssDNA phages in diverse habitats. However, the differences between ssDNA and dsDNA phages also substantially limit the efficacy of simultaneously assessing the abundance and diversity of these two phage groups. Here we provide an overview of the major differences between ssDNA and tailed dsDNA phages that may influence their effects on bacterial communities. Furthermore, through the analysis of 181 published metaviromes we demonstrate the environmental distribution of ssDNA phages and present an analysis of the methodological biases that distort their study through metagenomics. PMID:26850442

  15. THE EMPACT BEACHES PROJECT - A STUDY OF THE PARAMETERS THAT AFFECT MICROBIOLOGICAL MONITORING

    EPA Science Inventory

    The current U. S. Environmental Protection Agency (EPA) water sample collection method for recreational water was suggested by the Federal Water Pollution Control Agency in 1968 as part of the fecal coliform guideline. Although improvements have been made in the indicator bacter...

  16. UMTRA Project environmental, health, and safety plan

    SciTech Connect

    Not Available

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs.

  17. NPOESS Preparatory Project (NPP) Environmental Products

    NASA Astrophysics Data System (ADS)

    Grant, K. D.; Hughes, R.; Andreas, N. S.

    2010-12-01

    The National Oceanic and Atmospheric Administration (NOAA), Department of Defense (DoD), and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation weather and environmental satellite system; the National Polar-orbiting Operational Environmental Satellite System (NPOESS). NPOESS replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the Defense Meteorological Satellite Program (DMSP) managed by the DoD. The NPOESS satellites carry a suite of sensors that collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground data processing segment for NPOESS is the Interface Data Processing Segment (IDPS), developed by Raytheon Intelligence and Information Systems. The IDPS processes NPOESS satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to NOAA and DoD processing centers operated by the United States government. The IDPS will process EDRs beginning with the NPOESS Preparatory Project (NPP) and continuing through the lifetime of the NPOESS system. Northrop Grumman Aerospace Systems Algorithms and Data Products (A&DP) organization is responsible for the algorithms that produce the EDRs, including their quality aspects. Given a launch date for the NPP spacecraft on the near horizon and the need for users to become familiar with NPP environmental products, this paper will provide an overview of all the products generated by the IDPS and provided to NOAA’s Comprehensive Large Array-data Stewardship System (CLASS) for public distribution. It will discuss each of the 25 NPP EDRs in detail, including a description of the EDR, its size, coverage, measurement range, and expected uses.

  18. Fundamental Fluidization Research Project. Environmental Assessment

    SciTech Connect

    Not Available

    1994-01-01

    Morgantown Energy Technology Center proposes to conduct fundamental research on fluidization technology by designing, constructing, and operating a 2-foot diameter, 50-foot high, pressurized fluidized-bed unit. The anticipated result of the proposed project would be a better, understanding of fluidization phenomena under pressurized and high velocity conditions. This improved understanding would, provide a sound basis for design and scale-up of pressurized circulating fluidized-bed combustion (PCFBC) processes for fossil energy applications. Based on the analysis in the EA, DOE has determined that the proposed action is not a major, Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement is not required and the Department is issuing this FONSI.

  19. Overview of Microbiological Tests Performed During the Design of the International Space Station Environmental Control and Life Support Systems

    NASA Technical Reports Server (NTRS)

    Roman, Monsi C.; Mittelman, Marc W.

    2010-01-01

    The design and manufacturing of the main Environmental Control and Life Support Systems (ECLSS) for the United States segments of the International Space Station (ISS) was an involved process that started in the late 1980's, with the assessment and testing of competing technologies that could be used to clean the air and recycle water. It culminated in 2009 with the delivery and successful activation of the Water Recovery System (WRS) water processor (WP). The ECLSS required the work of a team of engineers and scientist working together to develop systems that could clean and/or recycle human metabolic loads to maintain a clean atmosphere and provide the crew clean water. One of the main goals of the ECLSS is to minimize the time spent by the crew worrying about vital resources not available in the vacuum of space, which allows them to spend most of their time learning to live in a microgravity environment many miles from the comforts of Earth and working on science experiments. Microorganisms are a significant part of the human body as well as part of the environment that we live in. Therefore, the ISS ECLSS design had to take into account the effect microorganisms have on the quality of stored water and wastewater, as well as that of the air systems. Hardware performance issues impacted by the accumulation of biofilm and/or microbiologically influenced corrosion were also studied during the ECLSS development stages. Many of the tests that were performed had to take into account the unique aspects of a microgravity environment as well as the challenge of understanding how to design systems that could not be sterilized or maintained in a sterile state. This paper will summarize the work of several studies that were performed to assess the impacts and/or to minimize the effects of microorganisms in the design of a closed loop life support system.

  20. Agricultural Microbiology.

    ERIC Educational Resources Information Center

    Brill, Winston J.

    1981-01-01

    Elucidates strategies for applying microbiological techniques to traditional agricultural practices. Discusses the manipulation of microorganisms that live with plants and also the problems involved in the introduction of new genes into crop plants by recombinant DNA methods. (CS)

  1. Microbiology Made Relevant

    ERIC Educational Resources Information Center

    Cronholm, Lois S.; Metz, Mildred C.

    1976-01-01

    Described are two hospital-based laboratory exercises which helped students perceive the relationship between the principles of microbiology and the practice of nursing. The exercises involved an environmental study focusing on problems of nosocomial infection and a study of patients hospitalized with infectious diseases. (Author/MS)

  2. Final rapid reactivation project environmental assessment

    SciTech Connect

    1999-02-10

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA.

  3. The Environmental and Genetic Approach for Life on Earth (EAGLE) project

    NASA Astrophysics Data System (ADS)

    Kanda, Hiroshi

    2009-11-01

    The Transdisciplinary Research Integration Center (TRIC) advances the basic objectives under the umbrella of the Research Organization of Information and Systems (ROIS). The TRIC co-ordinates the development of novel fields of research within the Inter-University Research Institute Corporation of Japan. The TRIC program fosters integrated research and develops information platforms that support the quest for new paradigms in the fields of Earth science and life systems. The project, “Environmental and Genetic Approach for Life on Earth with a Study of Relevant Modeling and Prediction Techniques (EAGLE)” began under the TRIC program in 2005. The goal of the EAGLE project is to improve our understanding of ecosystems on Earth and to investigate the mechanisms leading to the evolution of life and the adaptation of species as a result of past environmental changes. The EAGLE project is also positioned as a national project of the “Microbiological and Ecological Responses to Global Environmental Changes in polar regions (MERGE) program”, so called, “MERGE-Japan” which was initiated as part of the International Polar Year (IPY, 2007-2008). A general outline of the current achievements and discussion of the EAGLE project during the IPY period are presented in this progress report.

  4. Environmental impact assessment of the Dulang oilfield development project

    SciTech Connect

    Hasan, M.N. ); ))

    1988-01-01

    The authors discuss an environmental impact assessment (EIA) of the Dulang Oilfield Development Project, conducted to determine whether the project could proceed in a safe and environmentally acceptable manner. This is the first EIA for an offshore oilfield in Malaysian waters, and was conducted in anticipation of the Environmental Quality (Prescribed Activities) (Environmental Impact Assessment Order(1987)) which requires an EIA to be conducted for major oil and gas field development projects.

  5. Bangladesh Agro-Climatic Environmental Monitoring Project

    NASA Technical Reports Server (NTRS)

    Vermillion, C.; Maurer, H.; Williams, M.; Kamowski, J.; Moore, T.; Maksimovich, W.; Obler, H.; Gilbert, E.

    1988-01-01

    The Agro-Climatic Environmental Monitoring Project (ACEMP) is based on a Participating Agency Service Agreement (PASA) between the Agency for International Development (AID) and the National Oceanic and Atmospheric Administration (NOAA). In FY80, the Asia Bureau and Office of Federal Disaster Assistance (OFDA), worked closely to develop a funding mechanism which would meet Bangladesh's needs both for flood and cyclone warning capability and for application of remote sensing data to development problems. In FY90, OFDA provided for a High Resolution Picture Transmission (HRPT) receiving capability to improve their forecasting accuracy for cyclones, flooding and storm surges. That equipment is primarily intended as a disaster prediction and preparedness measure. The ACEM Project was designed to focus on the development applications of remote sensing technology. Through this Project, AID provided to the Bangladesh Government (BDG) the equipment, technical assistance, and training necessary to collect and employ remote sensing data made available by satellites as well as hydrological data obtained from data collection platforms placed in major rivers. The data collected will enable the BDG to improve the management of its natural resources.

  6. 15 CFR 291.3 - Environmental tools and techniques projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 1 2013-01-01 2013-01-01 false Environmental tools and techniques... MANUFACTURING EXTENSION PARTNERSHIP; ENVIRONMENTAL PROJECTS § 291.3 Environmental tools and techniques projects... initial development and implementation of tools or techniques which will aide manufacturing...

  7. 15 CFR 291.3 - Environmental tools and techniques projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 1 2014-01-01 2014-01-01 false Environmental tools and techniques... MANUFACTURING EXTENSION PARTNERSHIP; ENVIRONMENTAL PROJECTS § 291.3 Environmental tools and techniques projects... initial development and implementation of tools or techniques which will aide manufacturing...

  8. 15 CFR 291.3 - Environmental tools and techniques projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 1 2012-01-01 2012-01-01 false Environmental tools and techniques... MANUFACTURING EXTENSION PARTNERSHIP; ENVIRONMENTAL PROJECTS § 291.3 Environmental tools and techniques projects... initial development and implementation of tools or techniques which will aide manufacturing...

  9. Public Scholarship Student Projects for Introductory Environmental Courses

    ERIC Educational Resources Information Center

    Baum, Seth D.; Aman, Destiny D.; Israel, Andrei L.

    2012-01-01

    This paper presents a model project for introductory undergraduate courses that develops students as citizens contributing scholarship to public discussions of environmental issues. In this field-based project, students actively and independently engage with an environmental issue and present their project experience to a relevant public forum. In…

  10. Environmentally Preferable Coatings for Structural Steel Project

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie L. (Editor)

    2014-01-01

    The Ground Systems Development and Operations (GSDO) Program at NASA John F. Kennedy Space Center (KSC) has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described a the "launch support and infrastructure modernization program" in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion resistant coatings for launch facilities and ground support equipment. The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. Number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of corrosion protective coating system.

  11. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    ERIC Educational Resources Information Center

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  12. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Hobble Creek Restoration Project Final Environmental Assessment AGENCY: Office of the Assistant Secretary... with the Final Environmental Assessment--East Hobble Creek Restoration Project. These two agencies have... Restoration Project. The Final Environmental Assessment has been completed in conjunction with the June...

  13. Hanford Environmental Dose Reconstruction Project monthly report, February 1993

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1993-03-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project Is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data; Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates.

  14. Hanford Environmental Dose Reconstruction Project monthly report, February 1993

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1993-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project Is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data; Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates.

  15. Hanford Environmental Dose Reconstruction Project. Monthly report, November 1991

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1991-12-31

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates.

  16. Hanford Environmental Dose Reconstruction Project. Monthly report, January 1992

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-05-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  17. Hanford Environmental Dose Reconstruction Project monthly report, March 1993

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1993-03-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture and Environmental Pathways and Dose Estimates.

  18. Hanford Environmental Dose Reconstruction Project monthly report, January 1993

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1993-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944.The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data; Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates.

  19. Hanford Environmental Dose Reconstruction Project monthly report, January 1993

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1993-03-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944.The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data; Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates.

  20. Hanford Environmental Dose Reconstruction Project monthly report, August 1992

    SciTech Connect

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates.

  1. Hanford Environmental Dose Reconstruction Project monthly report, August 1992

    SciTech Connect

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates.

  2. Hanford Environmental Dose Reconstruction Project monthly report, May 1992

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These task correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates.

  3. Hanford Environmental Dose Reconstruction Project monthly report, May 1992

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-08-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These task correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates.

  4. Hanford Environmental Dose Reconstruction Project. Monthly Technical Report, November 1987

    SciTech Connect

    Haerer, H. A.

    1987-11-01

    This monthly report for November 1987 summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction Project being conducted at Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP).

  5. Industrial Microbiology.

    ERIC Educational Resources Information Center

    Demain, Arnold L.; Solomon, Nadine A.

    1981-01-01

    Presents an overview of the field of industrial microbiology, providing historical backgrounds of scientific discoveries in the field and descriptions of industrially important microorganisms. Applied research in industry is also detailed, with mention of gene amplification, DNA recombination, pharmaceutical approaches, and detoxification and…

  6. Coral microbiology

    USGS Publications Warehouse

    Rosenberg, Eugene; Kellogg, Christina A.; Rohwer, Forest

    2007-01-01

    In the last 30 years, there has been approximately a 30% loss of corals worldwide, largely due to emerging diseases (Harvell et al., 2002, 2007; Hughes et al., 2003). Coral microbiology is a new field, driven largely by a desire to understand the interactions between corals and their symbiotic microorganisms and to use this knowledge to eventually prevent the spread of coral diseases.

  7. Group Projects as a Method of Promoting Student Scientific Communication and Collaboration in a Public Health Microbiology Course

    ERIC Educational Resources Information Center

    Walton, Kristen L. W.; Baker, Jason C.

    2009-01-01

    Communication of scientific and medical information and collaborative work are important skills for students pursuing careers in health professions and other biomedical sciences. In addition, group work and active learning can increase student engagement and analytical skills. Students in our public health microbiology class were required to work…

  8. Learning about Foodborne Pathogens: Evaluation of Student Perceptions of Group Project Work in a Food Microbiology Course

    ERIC Educational Resources Information Center

    Turner, Mark S.

    2009-01-01

    This study examined the experiences of students in an active learning group work exercise in an introductory food microbiology course involving the study of foodborne pathogens. Small groups were required to access, analyze, and present information regarding a single food poisoning bacterium. The presentations contained features and…

  9. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  10. Kalispell Maintenance Headquarters Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-01-01

    The facilities needed to maintain and repair Bonneville Power Administration (BPA's) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area's maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

  11. Fernald Environmental Management Project 1995 site environmental report summary

    SciTech Connect

    1996-06-01

    This report summarizes the 1995 Site Environmental Report for the Fernald site. It describes the Fernald site mission, exposure pathways, and environmental standards and guidelines. An overview is presented of the impact these activities have on the local environment and public health. Environmental monitoring activities measure and estimate the amount of radioactive and nonradioactive materials that may leave the site and enter the surrounding environment.

  12. South Carolina Course Alignment Project: Environmental Scan

    ERIC Educational Resources Information Center

    Educational Policy Improvement Center (NJ1), 2007

    2007-01-01

    An "environmental scan" is designed to identify key issues of policy and practice in an area of interest so that action can be taken. By definition, an environmental scan focuses upon areas of concern. However, the results of an environmental scan are not designed to be either an indictment or endorsement of the current way of doing business since…

  13. Hanford Environmental Dose Reconstruction Project. Monthly report, June 1992

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates.

  14. Operational Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect

    Perkins, C.J.

    1994-08-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and operational environmental monitoring performed by Westinghouse Hanford Company as it implements the Operational Environmental Monitoring program. This plan applies to all sampling and monitoring activities performed by Westinghouse Hanford Company in implementing the Operational Environmental Monitoring program at the Hanford Site.

  15. Engaging Citizens in Environmental Decision Making: Burlington, Vermont's EMPACT Project

    ERIC Educational Resources Information Center

    Wang, Deane

    2002-01-01

    In 1998 a Burlington, Vermont partnership of a branch of city government and several educational and environmental organizations received a "metro-grant" to develop a project for the U.S. Environmental Protection Agency (EPA) under its Environmental Monitoring for Public Access and Community Tracking (EMPACT) Program. One goal was to develop…

  16. Hanford Environmental Dose Reconstruction Project monthly report, November 1992

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1992-12-31

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed members representing the states of Oregon, Washington. and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks: Source terms; environmental transport; environmental monitoring data; demography, food consumption and agriculture; environmental pathways and dose estimates.

  17. Hanford Environmental Dose Reconstruction Project monthly report, November 1992

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed members representing the states of Oregon, Washington. and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks: Source terms; environmental transport; environmental monitoring data; demography, food consumption and agriculture; environmental pathways and dose estimates.

  18. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ... Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft... impacts of the proposed East Hobble Creek Restoration project. The draft environmental assessment, being...: Notice of availability. SUMMARY: The draft environmental assessment for the East Hobble Creek...

  19. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  20. Fernald Environmental Management Project 1995 site environmental report

    SciTech Connect

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  1. The Field Project as a Tool for Teaching Environmental Psychology.

    ERIC Educational Resources Information Center

    Howells, Gary N.

    1978-01-01

    Describes a university class project designed to enable students to translate environmental research into action. Students focused on a conflict between state and county government over solid waste management. Outlines steps involved in such a project and discusses student involvement and the success of the project. (KC)

  2. Environmental Report Utah State Prison Geothermal Project

    SciTech Connect

    1980-03-01

    This environmental report assesses the potential impact of developing a geothermal resource for space heating at the Utah State Prison. Wells will be drilled on prison property for production and for injection to minimize reservoir depletion and provide for convenient disposal of cooled fluid. The most significant environmental concerns are the proper handling of drilling muds during well drilling and the disposal of produced water during well testing. These problems will be handled by following currently accepted practices to reduce the potential risks.

  3. Criticality accident alarm system at the Fernald Environmental Management Project

    SciTech Connect

    Marble, R.C.; Brown, T.D.; Wooldridge, J.C.

    1994-12-31

    This paper describes the staus of the Fernald Environmental Management Project (FEMP) criticality alarm system. A new radiation detection alarm system was installed in 1990. The anunciation system, calibration and maintenance, and detector placement is described.

  4. Hanford Environmental Dose Reconstruction Project. Monthly report, December 1991

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1991-12-31

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon and Washington, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on human (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data; Demographics, Agriculture, Food Habits and; Environmental Pathways and Dose Estimates.

  5. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  6. Environmental Technology (Laboratory Analysis and Environmental Sampling) Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Hinojosa, Oscar V.; Guillen, Alfonso

    A project assessed the need and developed a curriculum for environmental technology (laboratory analysis and environmental sampling) in the emerging high technology centered around environmental safety and health in Texas. Initial data were collected through interviews by telephone and in person and through onsite visits. Additional data was…

  7. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  8. Successful Application of Active Learning Techniques to Introductory Microbiology.

    ERIC Educational Resources Information Center

    Hoffman, Elizabeth A.

    2001-01-01

    Points out the low student achievement in microbiology courses and presents an active learning method applied in an introductory microbiology course which features daily quizzes, cooperative learning activities, and group projects. (Contains 30 references.) (YDS)

  9. Environmental Studies: Five Miscellaneous Reports. Project Reports, Volume 7, The Rachel Carson Project.

    ERIC Educational Resources Information Center

    Tanner, R. Thomas

    This document is the last of seven volumes included in the Rachel Carson Project. The project attempts to introduce environmental education lessons and units into existing courses of study within a high school curriculum rather than to implement environmental education through the introduction of new courses. Included in this volume is a report…

  10. Environmental Studies in Several Science Courses. Project Reports, Volume 4, The Rachel Carson Project.

    ERIC Educational Resources Information Center

    Tanner, R. Thomas

    This document is the fourth of seven accompanying volumes included in the Rachel Carson Project. The project attempts to introduce environmental education lessons and units into existing courses of study within a high school curriculum rather than to implement environmental education through the introduction of new courses. This volume reports the…

  11. Environmental Studies in the Physical Sciences. Project Reports, Volume 3, The Rachel Carson Project.

    ERIC Educational Resources Information Center

    Tanner, R. Thomas

    This document is the third of seven accompanying volumes included in the Rachel Carson Project. The project attempts to introduce environmental education lessons and units into existing courses of study within a high school rather than to implement environmental education through the introduction of new courses. This volume reports the…

  12. Environmentally Sound Small-Scale Energy Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Bassan, Elizabeth Ann; Wood, Timothy S., Ed.

    This manual is the fourth volume in a series of publications that provide information for the planning of environmentally sound small-scale projects. Programs that aim to protect the renewable natural resources that supply most of the energy used in developing nations are suggested. Considerations are made for physical environmental factors as…

  13. Trade-off analysis for environmental projects: An annotated bibliography

    SciTech Connect

    Feather, T.D.; Harrington, K.W.; Capan, D.T.

    1995-08-01

    This is a report with an attached annotated bibliography. This study explores the literature for analytical techniques that can support the complex decision-making process associated with Corps of Engineers environmental projects. The literature review focuses on opportunities for using trade-off methodologies and group processes in environmental plan formulation and evaluation. The work was conducted under the Evaluation Framework Work Unit within the Evaluation of Environmental Investments Research Program.

  14. Environmental Projects. Volume 9: Construction of hazardous materials storage facilities

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Activities at the Goldstone Deep Space Communications Complex (GDSCC) are carried out in support of seven parabolic dish antennas. These activities may give rise to environmental hazards. This report is one in a series of reports describing environmental projects at GDSCC. The construction of two hazardous materials and wastes storage facilities and an acid-wash facility is described. An overview of the Goldstone complex is also presented along with a description of the environmental aspects of the GDSCC site.

  15. Environmentally Sound Small-Scale Water Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Tillman, Gus

    This manual is the second volume in a series of publications on community development programs. Guidelines are suggested for small-scale water projects that would benefit segments of the world's urban or rural poor. Strategies in project planning, implementation and evaluation are presented that emphasize environmental conservation and promote…

  16. The Project-Based Learning Approach in Environmental Education

    ERIC Educational Resources Information Center

    Genc, Murat

    2015-01-01

    The purpose of this study is to investigate the effect of project-based learning on students' attitudes toward the environment. In the study that was performed with 39 students who take the "Environmental Education" course, attitude changes toward the environment were investigated in students who developed projects on environmental…

  17. Project Canada West. Canadian Environmental Concepts.

    ERIC Educational Resources Information Center

    Western Curriculum Project on Canada Studies, Edmonton (Alberta).

    The overall objective of the curriculum development project is to develop a general high school level interdisciplinary course on environment studies. This potential five to ten month course is outlined as follows: ecology, water pollution, air pollution, noise pollution, population, socioeconomic implications, and resource management. The general…

  18. Environmental training research project. Final report

    SciTech Connect

    1996-04-01

    Santa Fe Community College serves an area including the city and county of Santa Fe. The population has a high percentage of Hispanics and a Native American population of about 3%. The student body at the college generally reflects that of the service district. The college strives to recruit students from all segments of the population so there is representation among all ethnic and economic groups. The college strives to serve students and the community by offering educational opportunities that meet the needs of both elements and which will lead to gainful employment. Instruction is also offered to meets needs for retraining, upgrades, and personal enlightenment. The college started a hazardous materials management program in the fall of 1991 which has since been renamed environmental management. The purpose of this program is to prepare students for environmental careers, to provide required training such as OSHA HAZWOPER and refresher courses, and to provide educational opportunities that would make the public more environmentally aware. The program content needs to be studied to ensure we`re meeting the needs of the students and the business community. There had not been a significant opportunity to conduct this research.

  19. Managing environmental issues during international electric power project development

    SciTech Connect

    Cooper, H.W.

    1998-07-01

    Responsible international project developers most often view environmental matters with quite mixed emotions. Those with whom Dynalytics has worked would certainly never contemplate jeopardizing the health of anyone in the world. But while they want their projects realized, and are willing to implement reasonable requirements, they are often asked to do more than is appropriate, more than is technologically possible, and more than is financially possible. The paper discusses the following: who is in charge of environmental matters; whose environmental standards apply; the role of technology; accelerating timetables and reducing costs; documentation and applications; and post-construction requirements.

  20. Project W-314 phase I environmental permits and approvals plan

    SciTech Connect

    TOLLEFSON, K.S.

    1999-02-24

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided.

  1. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    SciTech Connect

    Not Available

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  2. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Not Available

    1992-10-01

    The Uranium Mill Tallings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1 (Chapter 3, paragraph 2). The UMTRA EPIP covers the time period of November 9, 1992, through November 8, 1993. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  3. International environmental issues and requirements for new power projects

    SciTech Connect

    Newman, J.R.; Maltby, J.H.

    1997-12-31

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  4. Application of quality assurance standards to environmental projects

    SciTech Connect

    Richardson, T.L.; Lynch, J.E.; Chaudhary, T.B.

    1994-12-31

    Quality assurance (QA) is critical to every environmental project undertaken. While QA appears to be a cut-and-dried subject, it is actually an evolving issue. Environmental projects need high QA standards. The needs of the nuclear industry have driven most QA programs for the last several decades. Mom recently, the internationally accepted ISO-9000 standard, and the more recent E-4 standard (in draft), have been suggested as alternatives to achieving QA for environmental firms. These standards can be successfully integrated and implemented. However, this requires good up-front planning of the program`s purpose and function and commitments by management and staff to make it work. The purpose of this paper is to discuss how various QA standards can be appropriately applied to the demands of environmental projects.

  5. Advanced Coal Conversion Process Demonstration Project. Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1992-04-01

    Western Energy Company (WECO) was selected by the Department of Energy (DOE) to demonstrate the Advanced Coal Conversion Process (ACCP) which upgrades low rank coals into high Btu, low sulfur, synthetic bituminous coal. As specified in the Corporate Agreement, RSCP is required to develop an Environmental Monitoring Plan (EMP) which describes in detail the environmental monitoring activities to be performed during the project execution. The purpose of the EMP is to: (1) identify monitoring activities that will be undertaken to show compliance to applicable regulations, (2) confirm the specific environmental impacts predicted in the National Environmental Policy Act documentation, and (3) establish an information base of the assessment of the environmental performance of the technology demonstrated by the project. The EMP specifies the streams to be monitored (e.g. gaseous, aqueous, and solid waste), the parameters to be measured (e.g. temperature, pressure, flow rate), and the species to be analyzed (e.g. sulfur compounds, nitrogen compounds, trace elements) as well as human health and safety exposure levels. The operation and frequency of the monitoring activities is specified, as well as the timing for the monitoring activities related to project phase (e.g. preconstruction, construction, commissioning, operational, post-operational). The EMP is designed to assess the environmental impacts and the environmental improvements resulting from construction and operation of the project.

  6. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  7. Environmental mitigation and the Upper Yazoo Projects

    NASA Astrophysics Data System (ADS)

    Dardeau, E. A.; Fischenich, J. C.

    1995-02-01

    The US Army Engineer District, Vicksburg (CELMK), evaluated an array of flood control alternatives, which included up to 167 water control structures, 52 confined disposal facilities, and 47 borrow pits as part of a major flood control effort known as the Upper Yazoo Projects (UYP). Many of these project features are capable of ponding water and thus can be managed to mitigate for aquatic, terrestrial, waterfowl, and wetland resource losses expected to occur as a result of the UYP. The benefits to be derived will depend upon the land uses and management of the ponded areas. The US Army Engineer Waterways Experiment Station developed procedures to quantify the cost and habitat benefits of the many management options for these sites. The mitigation strategy was derived by optimizing various combinations of land acquisition, reforestation, land-use change, and site hydrology so that the least-cost mitigation plan could be selected.

  8. Griffith Energy Project Final Environmental Impact Statement

    SciTech Connect

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  9. The Environmental Management Project Manager`s Handbook for improved project definition

    SciTech Connect

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook.

  10. Domestic environmental requirements, new and projected

    SciTech Connect

    McLean, B.J.

    1997-12-31

    The paper outlines and/or gives data on the following: environmental concerns; goal of Title IV; national SO{sub 2} emissions; reductions in wet sulfate deposition; SO{sub 2} allowance program--benefits and costs; utility NO{sub x} emissions; NO{sub x} compliance options; cost effectiveness of NO{sub x} control; electric power regulations timeline; Clean Air power initiative; what a new approach would look like; and an analysis of NO{sub x} and SO{sub 2} cap and trade scenarios.

  11. Near Facility Environmental Monitoring Quality Assurance Project Plan

    SciTech Connect

    MCKINNEY, S.M.

    2000-05-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards.

  12. Environmental planning for oil and gas projects in alliance organizations

    SciTech Connect

    Hanley, P.T.; Campbell, G.R.B.; Wuestenfield, K.S.

    1996-12-31

    Oil companies are increasingly adopting the {open_quotes}alliance{close_quotes} organization to develop innovative engineering solutions to make projects economic in an industry characterized by global opportunities and competition for investment dollars. This structure involves strategic contractual relationships between companies and contractors. On Alaska`s North Slope, BP Exploration (Alaska) Inc. has formed alliances to engineer and develop its Badami and Northstar oil fields. These fields are small in comparison to Prudhoe Bay and Endicott and their economics cannot support high capital and operating costs. Costs, reserves, and permits are the three major building blocks of a successful oil development project. The alliance structure presents some special challenges and opportunities in successfully designing an environmentally sensitive project rd obtaining permits. On the Badami project, permitting has required that alliance members, the regulators, and BPXA environmental personnel develop a mutual understanding and reaction of engineering and environmental constraints and opportunities. Part of the communications challenge has resulted from the differing mandates and boundaries of the alliance and the external requirements of environmental laws and regulations. The lessons learned on Badami have been adopted in environmental planning and permitting the Northstar project.

  13. Improving Environmental Projections in Nonboreal Eastern Europe

    NASA Astrophysics Data System (ADS)

    Groisman, Pavel; Ivanov, Sergiy; Gutman, Garik; Simmer, Clemens

    2009-02-01

    Regional Aspects of Climate-Terrestrial-Hydrologic Interactions in Non-boreal Eastern Europe; Odessa, Ukraine, 23-28 August 2008; Ecosystems in Eastern Europe, in particular environments such as grasslands and semiarid regions, have undergone significant changes during the entire twentieth century due to warming climate and socioeconomic impacts. As a result, the biome boundaries between forests and steppes and between steppes and semideserts have become increasingly volatile, with dramatic changes in phenology and land fertility. Compounding these problems is a dense rural population engaging in intense land use, a population that suffers socioeconomic hardships resulting from recent and still unsettled political changes. Such political problems combined with a lack of local funds have limited the amount of observational data collected in Eastern Europe, leaving climate modelers unable to validate regional climate projections.

  14. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  15. Yakima Fisheries Project : Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  16. Environmental projects. Volume 16: Waste minimization assessment

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The Goldstone Deep Space Communications Complex (GDSCC), located in the MoJave Desert, is part of the National Aeronautics and Space Administration's (NASA's) Deep Space Network (DSN), the world's largest and most sensitive scientific telecommunications and radio navigation network. The Goldstone Complex is operated for NASA by the Jet Propulsion Laboratory. At present, activities at the GDSCC support the operation of nine parabolic dish antennas situated at five separate locations known as 'sites.' Each of the five sites at the GDSCC has one or more antennas, called 'Deep Space Stations' (DSS's). In the course of operation of these DSS's, various hazardous and non-hazardous wastes are generated. In 1992, JPL retained Kleinfelder, Inc., San Diego, California, to quantify the various streams of hazardous and non-hazardous wastes generated at the GDSCC. In June 1992, Kleinfelder, Inc., submitted a report to JPL entitled 'Waste Minimization Assessment.' This present volume is a JPL-expanded version of the Kleinfelder, Inc. report. The 'Waste Minimization Assessment' report did not find any deficiencies in the various waste-management programs now practiced at the GDSCC, and it found that these programs are being carried out in accordance with environmental rules and regulations.

  17. The Effect of Environmental Science Projects on Students' Environmental Knowledge and Science Attitudes

    ERIC Educational Resources Information Center

    Al-Balushi, Sulaiman M.; Al-Aamri, Shamsa S.

    2014-01-01

    The current study explores the effectiveness of involving students in environmental science projects for their environmental knowledge and attitudes towards science. The study design is a quasi-experimental pre-post control group design. The sample was 62 11th-grade female students studying at a public school in Oman. The sample was divided into…

  18. Kinetic Modeling of Microbiological Processes

    SciTech Connect

    Liu, Chongxuan; Fang, Yilin

    2012-08-26

    Kinetic description of microbiological processes is vital for the design and control of microbe-based biotechnologies such as waste water treatment, petroleum oil recovery, and contaminant attenuation and remediation. Various models have been proposed to describe microbiological processes. This editorial article discusses the advantages and limiation of these modeling approaches in cluding tranditional, Monod-type models and derivatives, and recently developed constraint-based approaches. The article also offers the future direction of modeling researches that best suit for petroleum and environmental biotechnologies.

  19. Ashtabula Environmental Management Project Main Extrusion Plant Demolition Project. Demolition of the Ashtabula Environmental Management Project's Main Extrusion Plant

    SciTech Connect

    Colborn, Kurt; Johnson, Kathryn K.

    2003-02-27

    Significant progress was made this year toward closure of the Department of Energy's Ashtabula Environmental Management Project (AEMP) with the demolition of the 9-building Main Extrusion Plant Complex. The 44,000 square foot building complex formerly housed uranium extrusion facilities and equipment. At the start of the project in October of 2001, the buildings still contained a RCRA Part B storage area, operating mixed waste treatment facilities, active waste shredding and compacting process areas, and a state EPA permitted HEPA ventilation system. This paper presents a discussion of the multidisciplinary effort to bring the building to a safe shutdown condition in just six months, including relocation of existing process areas, utility isolation, and preliminary decontamination. Also discussed is the demolition strategy in which portions of the facility remained active while demolition was proceeding in other areas. Other details of the technical approach to the demolition are also discussed, including innovative techniques for demolition, galbestos removal, contamination control, and waste minimization. These techniques contributed to the early completion of demolition in July of 2002, fully two months ahead of schedule and $1.5 million under budget.

  20. Near-facility environmental monitoring quality assurance project plan

    SciTech Connect

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  1. Legionnaires’ disease from a cooling tower in a community outbreak in Lidköping, Sweden- epidemiological, environmental and microbiological investigation supported by meteorological modelling

    PubMed Central

    2012-01-01

    Background An outbreak of Legionnaires’ Disease took place in the Swedish town Lidköping on Lake Vänern in August 2004 and the number of pneumonia cases at the local hospital increased markedly. As soon as the first patients were diagnosed, health care providers were informed and an outbreak investigation was launched. Methods Classical epidemiological investigation, diagnostic tests, environmental analyses, epidemiological typing and meteorological methods. Results Thirty-two cases were found. The median age was 62 years (range 36 – 88) and 22 (69%) were males. No common indoor exposure was found. Legionella pneumophila serogroup 1 was found at two industries, each with two cooling towers. In one cooling tower exceptionally high concentrations, 1.2 × 109 cfu/L, were found. Smaller amounts were also found in the other tower of the first industry and in one tower of the second plant. Sero- and genotyping of isolated L. pneumophila serogroup 1 from three patients and epidemiologically suspected environmental strains supported the cooling tower with the high concentration as the source. In all, two L. pneumophila strains were isolated from three culture confirmed cases and both these strains were detected in the cooling tower, but one strain in another cooling tower as well. Meteorological modelling demonstrated probable spread from the most suspected cooling tower towards the town centre and the precise location of four cases that were stray visitors to Lidköping. Conclusions Classical epidemiological, environmental and microbiological investigation of an LD outbreak can be supported by meteorological modelling methods. The broad competence and cooperation capabilities in the investigation team from different authorities were of paramount importance in stopping this outbreak. PMID:23171054

  2. Hanford Environmental Dose Reconstruction Project: Monthly report, May 1989

    SciTech Connect

    Dennis, B.S.

    1989-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by Pacific Northwest Laboratory under the direction of independent Technical Steering Panel. The Technical Steering Panel consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included among the members are appointed technical members representing the States of Oregon and Washington, cultural and technical experts nominated by the Indian tribes in the region, and an individual representing the public.

  3. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    SciTech Connect

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  4. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    SciTech Connect

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE`s deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  5. Networking environmental metadata: a pilot project for the Mediterranean Region

    NASA Astrophysics Data System (ADS)

    Bonora, N.; Benito, M.; Abou El-Magd, I.; Mazzetti, P.; Ndong, C.

    2012-04-01

    To better exploit any environmental dataset it is necessary to provide detailed information (metadata) capable to furnish the best data description. Operating environmental data and information networking requires the long-term investment of financial and human resources. As these resources are scarce, ensuring sustainability can be a struggle. Then, to use more effectively human and economic resources and to avoid duplication, it is essential to test existing models and, where appropriate, replicate strategies and experiences. For the above reasons, it has been programmed to pilot a project to implement and test a metadata catalogue's networking, involving Countries afferent the Mediterranean Region, to demonstrate that the adoption of open source and free software and international interoperability standards can contribute to the alignment of I&TC resources to achieve environmental information sharing. This pilot, planned in the frame of the EGIDA FP7 European Project, aims to support the implementation of a replication methodology for the establishment of national/regional environmental information nodes on the bases of the System of Systems architecture concept, to support the exchange of environmental information in the frame of the Barcelona Convention and to incept a Mediterranean scale joint contribution to GEOSS focusing on partnership, infrastructures and products. To establish the partnership and to conduce interoperability tests, this pilot project build on the Info-RAC (Information and Communication Activity Centre of the United Nation Environmental Programme - Mediterranean Action Plan) and GEO (Group on Earth Observations) networks.

  6. HEDR model validation plan. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Napier, B.A.; Gilbert, R.O.; Simpson, J.C.; Ramsdell, J.V. Jr.; Thiede, M.E.; Walters, W.H.

    1993-06-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project has developed a set of computational ``tools`` for estimating the possible radiation dose that individuals may have received from past Hanford Site operations. This document describes the planned activities to ``validate`` these tools. In the sense of the HEDR Project, ``validation`` is a process carried out by comparing computational model predictions with field observations and experimental measurements that are independent of those used to develop the model.

  7. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  8. West Valley Demonstration Project site environmental report, calendar year 1997

    SciTech Connect

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  9. West Valley Demonstration Project site environmental report, calendar year 1999

    SciTech Connect

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  10. West Valley Demonstration Project site environmental report calendar year 1998

    SciTech Connect

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  11. Environmental cost of using poor decision metrics to prioritize environmental projects.

    PubMed

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. PMID:26365219

  12. Environmentally Sound Small-Scale Agricultural Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Mohonk Trust, New Paltz, NY.

    This publication is the first of a series of manuals that present environmental guidelines for planning and implementing ecologically sustainable projects. Attention is particularly directed to the agricultural situation and needs of developing nations. Subject areas discussed include: (1) users and uses (identifying the major purposes of the…

  13. Environmentally Responsible Aviation Project: Infrastructure Enhancements and New Capabilities

    NASA Technical Reports Server (NTRS)

    Bezos-OConnor, Gaudy M.

    2015-01-01

    This oral presentation highlights the technical investments the NASA Environmentally Responsible Aviation Project under the Integrated Systems Research Program within ARMD made during FY10-FY14 to upgrade/enhance the NASA infrastructure/testing assets and new capabilities required to mature the ERA N=2 Portfolio of airframe and propulsion technologies to TRL 5/6.

  14. 15 CFR 291.2 - Environmental integration projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Environmental integration projects. 291.2 Section 291.2 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NIST EXTRAMURAL PROGRAMS MANUFACTURING EXTENSION PARTNERSHIP;...

  15. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    SciTech Connect

    N /A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The

  16. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    NASA Technical Reports Server (NTRS)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  17. INEL Waste and Environmental Information Integration Project approach and concepts

    SciTech Connect

    Dean, L.A.; Fairbourn, P.J.; Randall, V.C.; Riedesel, A.M.

    1994-06-01

    The Idaho National Engineering, Laboratory (INEL) Waste and Environmental Information integration Project (IWEIIP) was established in December 1993 to address issues related to INEL waste and environmental information including: Data quality; Data redundancy; Data accessibility; Data integration. This effort includes existing information, new development, and acquisition activities. Existing information may not be a database record; it may be an entire document (electronic, scanned, or hard-copy), a video clip, or a file cabinet of information. The IWEIIP will implement an effective integrated information framework to manage INEL waste and environmental information as an asset. This will improve data quality, resolve data redundancy, and increase data accessibility; therefore, providing more effective utilization of the dollars spent on waste and environmental information.

  18. ENVIRONMENTAL EFFECTS OF WESTERN COAL SURFACE MINING. PART IV--CHEMICAL AND MICROBIOLOGICAL INVESTIGATIONS OF A SURFACE COAL MINE SETTLING POND

    EPA Science Inventory

    Chemical and microbiological investigations of the settling pond system at the West Decker Coal Mine in southeastern Montana were undertaken during 1975-1977. Concentrations of total dissolved solids, bicarbonate, sodium, sulfate, and nitrogen species in pond water were elevated ...

  19. 78 FR 52819 - Environmental Impact Statement: Interstate 81 Viaduct Project (Onondaga County, New York)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-26

    ... Federal Highway Administration Environmental Impact Statement: Interstate 81 Viaduct Project (Onondaga... the public that an Environmental Impact Statement (EIS) will be prepared for the proposed... Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act (NEPA) on...

  20. Effect of culture intensity and probiotics application on microbiological and environmental parameters in Litopenaeus vannamei culture ponds.

    PubMed

    Patil, Prasanna Kumar; Muralidhar, M; Solanki, Haresh G; Patel, Pretesh P; Patel, Krishna; Gopla, Chavali

    2016-01-01

    The present study examined the complex interaction among stocking density and extent of probiotic use with production and environmental parameters in Litopenaeus vannamei culture ponds to suggest suitable management strategies. The study was conducted inL. vannamei culture ponds with stocking density of 35 nos sq m(-1) (Group I) and 56 nos sq m(-1) (Group II) and probiotic application @16.5 kg ha(-1) and 157 kg ha(-1), respectively. There was no significant difference noted between the two groups of ponds in respect to ammonia oxidizing bacteria (AOB) in sediment and nitrite oxidizing bacteria (NOB) in water samples, whereas significantly higher levels of AOB in water samples of high intensity culture ponds (Group II) and NOB in sediment samples of Group I were observed. The levels of sulphur oxidizing bacteria (SOB) and sulphur reducing bacteria (SRB) in Group I pond water and in Group II sediment were significantly higher than their corresponding levels in the other group. In both the groups, ammonia, nitrite and sulphide concentrations were below toxic limits prescribed for shrimp farming. Comparing the production parameters at harvest revealed that low intensity culture ponds (Group I) had higher growth rate, average body weight and significantly lower FCR and higher survival rate than high intensity culture ponds (Group II). The results indicated that application of microbial products in higher quantities did not benefit significantly, and there is a need to regulate quantum and schedule of biological product usage for economically sustainable shrimp culture. PMID:26930856

  1. Designing of an environmental assessment algorithm for surface mining projects.

    PubMed

    Mirmohammadi, Mirsaleh; Gholamnejad, Javad; Fattahpour, Vahidoddin; Seyedsadri, Pejman; Ghorbani, Yousef

    2009-06-01

    This paper depicts the method used to quantify the environmental impact of mining activities in surface mine projects. The affected environment was broken down into thirteen components, such as Human health and immunity, Surface water, Air quality, etc. The effect of twenty impacting factors from the mining and milling activities was then calculated for each Environmental Component. Environmental assessments are often performed by using matrix methods in which one dimension of the matrix is the "Impacting Factor" and the other one is the "Environmental Components". For the presented matrix method, each Impacting Factor was first given a magnitude between -10 and 10. These factors are used to set up a matrix named Impacting Factor Matrix, whose elements represent the Impacting Factor values. The effects of each Impacting Factor on each Environmental Component were then quantified by multiplying the Impacting Factor Matrix by Weighting Factor Matrix. The elements of the weighting factors matrix reflect the effects of each Impacting Factor on each Environmental Component. The outlined method was originally developed for a mining and milling operation in Iran, but it can successfully be used for mining ventures and more general industrial activities in other countries in accordance to their environmental regulations and laws. PMID:19286301

  2. Influence of Animation-Supported Project-Based Instruction Method on Environmental Literacy and Self-Efficacy in Environmental Education

    ERIC Educational Resources Information Center

    Aslan Efe, Hulya; Yucel, Sait; Baran, Medine; Oner Sunkur, Meral

    2012-01-01

    The present study conducted to establish effective environmental education investigated the influence of the project-based environmental education method supported with computer animations and of the traditional environmental education method on students' environmental literacy and on their self-efficacy beliefs in giving environmental education.…

  3. Work plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Not Available

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  4. Environmental benefits of Boston Harbor clean-up projects

    SciTech Connect

    Connor, M.S.; Smith, W.M. )

    1990-01-09

    The Massachusetts Water Resources Authority has undertaken one of the largest public works projects in the country to control the pollution of Boston Harbor. The project includes construction of a new primary and secondary treatment plant and sludge treatment facilities, excavation of a long ocean outfall and diffuser, and a solution to the overflow of mixed sewage and stormwater during storms; it will take over twenty years and billions of dollars to construct. A comparison of the relative costs and environmental benefits of relative costs and environmental benefits of the various construction projects, and other pollution control strategies, shows that some projects are more cost-effective than others for solving specific pollution problems. The capture and treatment of combined sewer overflow (CSO) will result in a more dramatic reduction of pathogen contamination than will completion of the primary and secondary treatment plants. Although the flow of raw sewage is intermittent and relatively small, it has high concentrations of bacteria and viruses. On the other hand, the new treatment plants will be more important in reducing toxic contamination of fish and shellfish. In summary, all the planned clean-up projects appear to be necessary to reach the goal of a swimmable, fishable Boston Harbor.

  5. Summary of Session Activities: Coordination of Environmental Education Projects

    NASA Technical Reports Server (NTRS)

    Keeler, Michael; Mahootian, Farzad

    1995-01-01

    In this session, we address four fundamental questions related to environmental fields with emphasis on education. These are: What are the goals, objectives, and practical opportunities for coordinating our projects? How can we improve awareness of, interest in, access to, and support the products of our work? How can we build relationships between projects for scientific, educational, technical, and programmatic benefit? How can we evaluate the effectiveness of coordination efforts. In this working session, we produced answers to these questions and proposed a structure for future collaboration.

  6. Validation of HEDR models. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Napier, B.A.; Simpson, J.C.; Eslinger, P.W.; Ramsdell, J.V. Jr.; Thiede, M.E.; Walters, W.H.

    1994-05-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project has developed a set of computer models for estimating the possible radiation doses that individuals may have received from past Hanford Site operations. This document describes the validation of these models. In the HEDR Project, the model validation exercise consisted of comparing computational model estimates with limited historical field measurements and experimental measurements that are independent of those used to develop the models. The results of any one test do not mean that a model is valid. Rather, the collection of tests together provide a level of confidence that the HEDR models are valid.

  7. Statistical analysis of real-time, environmental radon monitoring results at the Fernald Environmental Management Project.

    PubMed

    Liu, N; Spitz, H B; Tomczak, L

    1996-02-01

    A comprehensive real-time, environmental radon monitoring program is being conducted at the Fernald Environmental Management Project, where a large quantity of radium-bearing residues have been stored in two covered earth-bermed silos. Statistical analyses of radon measurement results were conducted to determine what impact, if any, radon emitted by the radium bearing materials contained in the silos has on the ambient radon concentration at the Fernald Environmental Management Project site. The distribution that best describes the outdoor radon monitoring data was determined before statistical analyses were conducted. Random effects associated with the selection of radon monitoring locations were accommodated by using nested and nested factorial classification models. The Fernald Environmental Management Project site was divided into four general areas according to their characteristics and functions: 1) the silo area, where the radium-bearing waste is stored; 2) the production/administration area; 3) the perimeter area, or fence-line, of the Fernald Environmental Management Project site; and 4) a background area, located approximately 13 km from the Fernald Environmental Management Project site, representing the naturally-occurring radon concentration. A total of 15 continuous, hourly readout radon monitors were installed in these 4 areas to measure the outdoor radon concentration. Measurement results from each individual monitor were found to be log-normally distributed. A series of contrast tests, which take random effects into account, were performed to compare the radon concentration between different areas of the site. These comparisons demonstrate that the radon concentrations in the production/administration area and the perimeter area are statistically equal to the natural background, whereas the silo area is significantly higher than background. The study also showed that the radon concentration in the silo area was significantly reduced after a sealant

  8. Environmental Audit of the Grand Junction Projects Office

    SciTech Connect

    Not Available

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  9. Environmental management compliance reengineering project, FY 1997 report

    SciTech Connect

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  10. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  11. Tiering strategic environmental assessment and project environmental impact assessment in highway planning in Sao Paulo, Brazil

    SciTech Connect

    Sanchez, Luis E. Silva-Sanchez, Solange S.

    2008-10-15

    Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project, called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on 'what is strategic' is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval.

  12. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    SciTech Connect

    Cercy, M; Ronald Fayfich, R; Steven P Schneider, S

    2008-12-12

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

  13. Technical Risk Rating of DOE Environmental Projects - 9153

    SciTech Connect

    Cercy, Michael; Fayfich, Ronald; Schneider, Steven

    2009-02-11

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

  14. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  15. Phase 1 of the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Not Available

    1990-07-20

    This report summarizes the water pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project, conducted by Battelle staff at the Pacific Northwest Laboratory under the direction of an independent Technical Steering Panel. The HEDR Project is estimating radiation doses that could have been received by the public from the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the water-pathway dose reconstruction sought to determine whether dose estimates could be calculated for populations in the area from above the Hanford Site at Priest Rapids Dam to below the site at McNary Dam from January 1964 to December 1966. Of the potential sources of radionuclides from the river, fish consumption was the most important. Later phases of the HEDR Project will address dose estimates for periods other than 1964--1966 and for populations downstream of McNary Dam. 17 refs., 20 figs., 1 tab.

  16. Estimation of food consumption. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Callaway, J.M. Jr.

    1992-04-01

    The research reported in this document was conducted as a part of the Hanford Environmental Dose Reconstruction (HEDR) Project. The objective of the HEDR Project is to estimate the radiation doses that people could have received from operations at the Hanford Site. Information required to estimate these doses includes estimates of the amounts of potentially contaminated foods that individuals in the region consumed during the study period. In that general framework, the objective of the Food Consumption Task was to develop a capability to provide information about the parameters of the distribution(s) of daily food consumption for representative groups in the population for selected years during the study period. This report describes the methods and data used to estimate food consumption and presents the results developed for Phase I of the HEDR Project.

  17. Environmental monitoring and assessment program forest health monitoring quality assurance project plan for detection monitoring project

    SciTech Connect

    Cline, S.P.; Alexander, S.A.; Barnard, J.E.

    1995-05-01

    The Quality Assurance Project Plan (QAP) is written specifically for the Detection Minitoring project of the interagency Forest Health Monitoring (FHM) program. Sections 1 through 3 briefly explain key features of the Environmental Monitoring and Assessment Program (EMAP), the FHM program, and their interrelationship, respectively. Section 4 describes the general quality assurance (QA) requirements for the FHM Detection Monitoring project. Section 5 contains the separate QAPs for each forest condition indicator: site condition and tree growth and regeneration, tree crown condition, tree damage assessment, photosynthetically active radiation (PAR), vegetation structure, ozone bioindicator plants, and lichen communities.

  18. Final report for SNL/NM environmental drilling project

    SciTech Connect

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  19. Environmental assessment of USAID housing projects in the Russian Federation

    SciTech Connect

    Loran, B.; Miller, C.

    1995-12-01

    Parsons was selected by the United States Agency for International Development (USAID) as the general contractor for construction management for the construction of 2,500 housing units within the Russian Federation. These housing units, to be occupied by Russian officers returning from the Baltic States, are under construction on 15 sites, selected from an initial list of 200, based on habitability, capability of successful final construction. Cost meeting USAID guidelines, and impacts on the environment. USAID fulfilled NEPA requirements by preparing, with assistance of Parsons Engineering Science, a Programmatic Environmental Assessment and 15 site specific Environmental Assessments for the project. The sites were scattered over the entire Russian Federation west of the Ural Mountains. The site offerors completed an environmental checklist covering a broad range of possible impacts. Significant environmental issues and concerns were further identified during scoping meetings held at the site locations. The most important issues discussed were: soil contamination; gaseous, liquid, and solid pollutants to which the site may be exposed; incompatible adjacent land uses; ready access to utilities and social services; and socioeconomic situation favorable to resettlement of Russian military officers. No major environmental issues or concerns were identified for the 15 selected sites. Certificates indicating the absence of chemical and radiological surface and subsurface contamination at the proposed sites were provided by the local environmental officers. Polynuclear aromatic hydrocarbons were found present at one of the sites considered in a preliminary selection, and later rejected due to the failure of contractual negotiations. The environmental assessments included mitigation and monitoring measures for construction and operation (occupancy) impacts.

  20. Environmental impacts of dispersed development from federal infrastructure projects.

    PubMed

    Southerland, Mark T

    2004-06-01

    Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning. PMID:15141453

  1. Interim report for SNL/NM environmental drilling project

    SciTech Connect

    Wemple, R.P.; Meyer, R.D.; Layne, R.R.

    1994-02-01

    Concern for the environment and cost reduction are the driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. Preliminary activities included surveying the directional drilling access needs of various DOE sites, identifying an existing class of machinery that could be enhanced for environmental work through development, and establishing a mutually beneficial working relationship with an industry partner. Since that time the project has tested a variety of prototype machinery and hardware built by the industrial partner, and SNL. The project continues to test and develop the machinery and technique refinements needed for future applications at DOE, DOD, and private sector sites. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of ``cut/thrust and compact cuttings without adding large quantities of fluid`` to an environmental problem site. Technology transfer to the private sector is ongoing and ultimately should result in commercial availability of the machinery. Education of regulatory agencies resulting in restructuring appropriate regulatory standards for specification of the horizontal drilling techniques will be a final project goal.

  2. Student Project Work and Abstracts. Beaufort, North Carolina Environmental Studies Project, No. 2.

    ERIC Educational Resources Information Center

    Carteret County Board of Education, Beaufort, NC.

    This document contains reports of 11 environmental study projects conducted by junior and senior students in a North Carolina high school. Topics range from the construction of an artificial reef and a survey of seashore changes to surveys of past and present development of various facets of the county ecology. The emphasis is on student…

  3. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  4. BP Cherry Point Cogeneration Project, Draft Environmental Impact Statement

    SciTech Connect

    N /A

    2003-09-19

    BP West Coast Products, LLC (BP or the Applicant) proposes to construct and operate a nominal 720-megawatt (MW), natural-gas-fired, combined-cycle cogeneration facility next to the existing BP Cherry Point Refinery in Whatcom County, Washington. The Applicant also owns and operates the refinery, but the cogeneration facility and the refinery would be operated as separate business units. The cogeneration facility and its ancillary infrastructure would provide steam and 85 MW of electricity to meet the operating needs of the refinery and 635 MW of electrical power for local and regional consumption. The proposed cogeneration facility would be located between Ferndale and Blaine in northwestern Whatcom County, Washington. The Canadian border is approximately 8 miles north of the proposed project site. The Washington State Energy Facility Site Evaluation Council (EFSEC) has jurisdiction over the evaluation of major energy facilities including the proposed project. As such, EFSEC will recommend approval or denial of the proposed cogeneration facility to the governor of Washington after an environmental review. On June 3, 2002, the Applicant filed an Application for Site Certification (ASC No. 2002-01) with EFSEC in accordance with Washington Administrative Code (WAC) 463-42. On April 22, 2003, the Applicant submitted an amended ASC that included, among other things, a change from air to water cooling. With the submission of the ASC and in accordance with the State Environmental Policy Act (SEPA) (WAC 463-47), EFSEC is evaluating the siting of the proposed project and conducting an environmental review with this Environmental Impact Statement (EIS). Because the proposed project requires federal agency approvals and permits, this EIS is intended to meet the requirements under both SEPA and the National Environmental Policy Act (NEPA). The Bonneville Power Administration (Bonneville) and U.S. Army Corps of Engineers (Corps) also will use this EIS as part of their

  5. Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  6. Microbiological Tests Performed During the Design of the International Space Station Environmental Control and Life Support Systems. Part 1, Bulk Phase. Part 1; Bulk Phase

    NASA Technical Reports Server (NTRS)

    Roman, Monsi C.; Mittelman, Marc W.

    2010-01-01

    The design and manufacturing of the main Environmental Control and Life Support Systems (ECLSS) for the United States segments of the International Space Station (ISS) was an involved process that started in the mid 1980s, with the assessment and testing of competing technologies that could be used to clean the air and recycle water. It culminated in 2009 with the delivery and successful activation of the Water Recovery System (WRS) water processor (WP). The ECLSS required the work of a team of engineers and scientist working together to develop systems that could clean and/or recycle human metabolic loads to maintain a clean atmosphere and provide the crew clean water. One of the main goals of the ECLSS is to minimize the time spent by the crew worrying about vital resources not available in the vacuum of space, which allows them to spend most of their time learning to live in a microgravity environment many miles from the comforts of Earth and working on science experiments. Microorganisms are a significant part of the human body as well as part of the environment that we live in. Therefore, the ISS ECLSS design had to take into account the effect microorganisms have on the quality of stored water and wastewater, as well as that of the air systems. Hardware performance issues impacted by the accumulation of biofilm and/or microbiologically influenced corrosion were also studied during the ECLSS development stages. Many of the tests that were performed had to take into account the unique aspects of a microgravity environment as well as the challenge of understanding how to design systems that could not be sterilized or maintained in a sterile state. This paper will summarize the work of several studies that were performed to assess the impacts and/or to minimize the effects of microorganisms in open, semi-closed and closed loop life support system. The biofilm and biodeterioration studies that were performed during the design and test periods will be presented in

  7. Environmental Project of I.E.S. Antoni Maura

    NASA Astrophysics Data System (ADS)

    Crespi Salom, Pere

    2010-05-01

    Environmental Project of I.E.S. Antoni Maura Author(s): Pere Crespí i Salom Teacher of Department of Biology and Geology and Environmental Coordinator (2009-2010) from I.E.S. Antoni Maura . Mallorca. Illes Balears. Spain Teachers participating in the project : Myriam Fuentes Milani, Olga Ballester Nebot, Antoni Salom Ruiz, Julio René Loayza Casanova, Puy Aguirre Rémirez, Yolanda Martínez Laserna, Jaume Puppo Lama, Carme Arrom , Dolors Aguiló Segura, Marga Ordinas Boter, Angel Fernàndez Albertí , Immaculada Suau López, Antònia Florit Torrandell, Isabel Mateu Arcos, Román Piña Valls i Pere Crespí Salom. Our institute takes part since 2004 in adapting environmentally the schools in the Balearics which consists of developing activities which aim is that both teachers and students acquire habits so as to apply to their ordinary lives though different participative commissions ( 10-15 teachers): 1st commission: recycling and reusing materials. Enough bins in the classrooms and floors: yellow for plastic, blue for paper, and green for the other. We tend to use recycled materials in different celebrations such as Carnival, Christmas, Saint Jordi and Environmental day. We also organise workshops for the teachers to develop afterwards with the students and nature of environmental exposures. 2nd commission: Scatter information ( MonMaura, Maurifull, Green window and website).Throughout different means we inform the teachers and students about all the school activities and where to consult.( www.iesantonimaura.net, Playful area , environmental project ). 3rd commission: Reusing text books.( there is a students service of borrowing books and giving them back at the end of the school year if the book is in good use.) 4th commission: Improving the school surroundings, the back garden and garden with native plants. Department of Biology and Geology is responsible for caring for an organic garden and in turn improve the center's garden with native plants within the

  8. Automation in Clinical Microbiology

    PubMed Central

    Ledeboer, Nathan A.

    2013-01-01

    Historically, the trend toward automation in clinical pathology laboratories has largely bypassed the clinical microbiology laboratory. In this article, we review the historical impediments to automation in the microbiology laboratory and offer insight into the reasons why we believe that we are on the cusp of a dramatic change that will sweep a wave of automation into clinical microbiology laboratories. We review the currently available specimen-processing instruments as well as the total laboratory automation solutions. Lastly, we outline the types of studies that will need to be performed to fully assess the benefits of automation in microbiology laboratories. PMID:23515547

  9. Microbiology & Toxicology: Space Environment

    NASA Video Gallery

    One key aspect in maintaining crew health and performance during spaceflight missions is the provision of a habitable environment with acceptably low concentrations of microbiological and toxicolog...

  10. Draft environmental assessment -- Test Area North pool stabilization project update

    SciTech Connect

    1997-06-01

    The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

  11. Environmental Assessment -- Test Area North pool stabilization project update

    SciTech Connect

    1997-08-01

    The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

  12. An overview of the Environmental Monitoring Computer Automation Project

    SciTech Connect

    Johnson, S.M.; Lorenz, R.

    1992-12-31

    The Savannah River Site (SRS) was bulk to produce plutonium and tritium for national defense. As a result of site operations, routine and accidental releases of radionuclides have occurred. The effects these releases have on the k>cal population and environment are of concern to the Department of Energy (DOE) and SRS personnel. Each year, approximately 40,000 environmental samples are collected. The quality of the samples, analytical methods and results obtained are important to site personnel. The Environmental Monitoring Computer Automation Project (EMCAP) was developed to better manage scheduling, log-in, tracking, analytical results, and report generation. EMCAP can be viewed as a custom Laboratory Information Management System (LIMS) with the ability to schedule samples, generate reports, and query data. The purpose of this paper is to give an overview of the SRS environmental monitoring program, describe the development of EMCAP software and hardware, discuss the different software modules, show how EMCAP improved the Environmental Monitoring Section program, and examine the future of EMCAP at SRS.

  13. An overview of the Environmental Monitoring Computer Automation Project

    SciTech Connect

    Johnson, S.M.; Lorenz, R.

    1992-01-01

    The Savannah River Site (SRS) was bulk to produce plutonium and tritium for national defense. As a result of site operations, routine and accidental releases of radionuclides have occurred. The effects these releases have on the k>cal population and environment are of concern to the Department of Energy (DOE) and SRS personnel. Each year, approximately 40,000 environmental samples are collected. The quality of the samples, analytical methods and results obtained are important to site personnel. The Environmental Monitoring Computer Automation Project (EMCAP) was developed to better manage scheduling, log-in, tracking, analytical results, and report generation. EMCAP can be viewed as a custom Laboratory Information Management System (LIMS) with the ability to schedule samples, generate reports, and query data. The purpose of this paper is to give an overview of the SRS environmental monitoring program, describe the development of EMCAP software and hardware, discuss the different software modules, show how EMCAP improved the Environmental Monitoring Section program, and examine the future of EMCAP at SRS.

  14. ENVIRONMENTAL FACTORS AND CHEMICAL AND MICROBIOLOGICAL WATER QUALITY CONSTITUTENTS RELATED TO THE PRESENCE OF ENTERIC VIRUSES IN GROUND WATER FROM SMALL PUBLIC WATER SUPPLIES IN SOUTHEASTERN MICHIGAN

    EPA Science Inventory

    A study of small public ground-water-supply wells that produce water from discontinuous sand and gravel aquifers was done from July 1999 through July 2001 in southeastern Michigan. Samples were collected to determine the occurrence of viral pathogens and microbiological indicato...

  15. ENVIRONMENTAL FACTORS AND CHEMICAL AND MICROBIOLOGICAL CONSTITUENTS RELATED TO THE PRESENECE OF VIRUSES IN GROUND WATER FROM SMALL PUBLIC WATER SUPPLIES IN SOUTHEASTERN MICHIGAN

    EPA Science Inventory

    Thirty-eight public ground-water-supply wells serving fewer than 3,300 people were sampled from July 1999 through July 2001 in southeastern Michigan to determine (1) the occurrence of viral pathogens and microbiological indicators, (2) the adequacy of indicators as predictors of...

  16. [Nuclear energy and environment: review of the IAEA environmental projects].

    PubMed

    Fesenko, S; Fogt, G

    2012-01-01

    The review of the environmental projects of the International Atomic Energy Agency is presented. Basic IAEA documents intended to protect humans and the Environment are considered and their main features are discussed. Some challenging issues in the area of protection of the Environment and man, including the impact of nuclear facilities on the environment, radioactive waste management, and remediation of the areas affected by radiological accidents, nuclear testing and sites of nuclear facilities are also discussed. The need to maintain the existing knowledge in radioecology and protection of the environment is emphasised. PMID:23516895

  17. Environmental information volume: Liquid Phase Methanol (LPMEOH{trademark}) project

    SciTech Connect

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature.

  18. The Rocky Flats Environmental Technology Site beryllium characterization project

    SciTech Connect

    Morrell, D.M.; Miller, J.R.; Allen, D.F.

    1999-06-01

    A site beryllium characterization project was completed at the Rocky Flats Environmental Technology Site (RFETS) in 1997. Information from historical reviews, previous sampling surveys, and a new sampling survey were used to establish a more comprehensive understanding of the locations and levels of beryllium contamination in 35 buildings. A feature of the sampling strategy was to test if process knowledge was a good predictor of where beryllium contamination could be found. Results revealed that this technique was effective at identifying where surface contamination levels might exceed the RFETS smear control level but that it was not effective in identifying where low concentrations of beryllium might be found.

  19. Idaho National Engineering Laboratory Sewer System Upgrade Project. Environmental Assessment

    SciTech Connect

    Not Available

    1994-04-01

    The Department of Energy (DOE) has prepared an environmental assessment for a proposed Sewer System Upgrade Project at the Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho. The proposed action would include activities conducted at the Central Facilities Area, Test Reactor Area, and the Containment Test Facility at the Test Area North at INEL. The proposed action would consist of replacing or remodeling the existing sewage treatment plants at the Central Facilities Area, Test Reactor Area, and Containment Test Facility. Also, a new sewage testing laboratory would be constructed at the Central Facilities Area. Finally, the proposed action would include replacing, repairing, and/or adding sewer lines in areas where needed.

  20. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    SciTech Connect

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment.

  1. HEDR modeling approach. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; Napier, B.A.

    1992-07-01

    This report details the conceptual approaches to be used in calculating radiation doses to individuals throughout the various periods of operations at the Hanford Site. The report considers the major environmental transport pathways--atmospheric, surface water, and ground water--and projects and appropriate modeling technique for each. The modeling sequence chosen for each pathway depends on the available data on doses, the degree of confidence justified by such existing data, and the level of sophistication deemed appropriate for the particular pathway and time period being considered.

  2. User instructions for the DESCARTES environmental accumulation code. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Miley, T.B.; Eslinger, P.W.; Nichols, W.E.; Lessor, K.S.; Ouderkirk, S.J.

    1994-05-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation dose that individuals could have received as a result of emissions since 1944 from the Hanford Site near Richland, Washington. The HEDR Project work is conducted under several technical and administrative tasks, among which is the Environmental Pathways and Dose Estimates task. The staff on this task have developed a suite of computer codes which are used to estimate doses to individuals in the public. This document contains the user instructions for the DESCARTES (Dynamic estimates of concentrations and Accumulated Radionuclides in Terrestrial Environments) suite of codes. In addition to the DESCARTES code, this includes two air data preprocessors, a database postprocessor, and several utility routines that are used to format input data needed for DESCARTES.

  3. Environmental Assessment for the Accelerated Tank Closure Demonstration Project

    SciTech Connect

    N /A

    2003-06-16

    The U.S. Department of Energy's (DOE) Office of River Protection (ORP) needs to collect engineering and technical information on (1) the physical response and behavior of a Phase I grout fill in an actual tank, (2) field deployment of grout production equipment and (3) the conduct of component closure activities for single-shell tank (SST) 241-C-106 (C-106). Activities associated with this Accelerated Tank Closure Demonstration (ATCD) project include placement of grout in C-106 following retrieval, and associated component closure activities. The activities will provide information that will be used in determining future closure actions for the remaining SSTs and tank farms at the Hanford Site. This information may also support preparation of the Environmental Impact Statement (EIS) for Retrieval, Treatment, and Disposal of Tank Waste and Closure of Single-Shell Tanks at the Hanford Site, Richland, Washington (Tank Closure EIS). Information will be obtained from the various activities associated with the component closure activities for C-106 located in the 241-C tank farm (C tank farm) under the ''Resource Conservation and Recovery Act of 1976'' (RCRA) and the Hanford Federal Facility Agreement and Consent Order (HFFACO) (Ecology et al. 1989). The impacts of retrieving waste from C-106 are bounded by the analysis in the Tank Waste Remediation System (TWRS) EIS (DOE/EIS-0189), hereinafter referred to as the TWRS EIS. DOE has conducted and continues to conduct retrieval activities at C-106 in preparation for the ATCD Project. For major federal actions significantly affecting the quality of the human environment, the ''National Environmental Policy Act of 1969'' (NEPA) requires that federal agencies evaluate the environmental effects of their proposed and alternative actions before making decisions to take action. The President's Council on Environmental Quality (CEQ) has developed regulations for implementing NEPA. These regulations are found in Title 40 of the Code

  4. A guide to environmental monitoring data, 1945--1972: Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Thiede, M.E.; Bates, D.J.; Mart, E.I.; Hanf, R.W.

    1994-03-01

    This report is a guide to the work accomplished by the Environmental Monitoring Data Task, which is one of the tasks in the Hanford Environmental Dose Reconstruction (HEDR) Project. The objective of the Environmental Monitoring Data Task was to recover, evaluate, process, and/or reconstruct the environmental monitoring data for the period 1945--1972. The period of time for which environmental monitoring data were sought was determined by the start-up and shut-down dates of the Hanford facilities that emitted the majority of radionuclides to the two major pathways: air and the Columbia River. Radionuclide emissions to the air were mainly the result of the operation of the chemical separations plants from 1944--1972 (Heeb 1994). Radionuclide emissions to the Columbia River were mainly the result of the operation of the single-pass production reactors from 1944--1971 (Heeb and Bates 1994). Therefore, the historical environmental monitoring data sought were for the period 1945--1972. Within the period of 1945--1972, specific periods of interest to the HEDR Project vary depending on the pathway. For example, 1945--1951 was the peak period for radionuclide emissions to the air and hence vegetation uptake of radionuclides, while 1956--1965 was the peak period for radionuclide emissions to the Columbia River and hence fish uptake of radionuclides. However, adequate historical data were not always available for the periods of interest. In the case of vegetation measurements, conversion and correction factors had to be developed to convert the historical measurements to modern standard measurements. Table S.1 lists the reports that explain these conversion and correction factors. In the case of Columbia River fish and waterfowl, bioconcentration factors were developed for use in any year where the river pathway data are insufficient.

  5. New Technologies in Clinical Microbiology

    PubMed Central

    Wolk, Donna M.; Dunne, W. Michael

    2011-01-01

    Rapid identification of microorganisms in the clinical microbiology laboratory can be of great value for selection of optimal patient management strategies for infections caused by bacteria, viruses, fungi, mycobacteria, and parasites. Rapid identification of microorganisms in clinical samples enables expedient de-escalation from broad-spectrum agents to targeted antimicrobial therapy. The switch to tailored therapy minimizes risks of antibiotics, namely, disruption of normal flora, toxic side effects, and selective pressure. There is a critical need for new technologies in clinical microbiology, particularly for bloodstream infections, in which associated mortality is among the highest of all infections. Just as importantly, there is a need for the clinical laboratory community to embrace the practices of evidence-based interventional laboratory medicine and collaborate in translational research projects to establish the clinical utility, cost benefit, and impact of new technologies.

  6. Susitna Hydroelectric Project: terrestrial environmental workshop and preliminary simulation model

    USGS Publications Warehouse

    Everitt, Robert R.; Sonntag, Nicholas C.; Auble, Gregory T.; Roelle, James E.; Gazey, William

    1982-01-01

    The technical feasibility, economic viability, and environmental impacts of a hydroelectric development project in the Susitna River Basin are being studied by Acres American, Inc. on behalf of the Alaska Power Authority. As part of these studies, Acres American recently contracted LGL Alaska Research Associates, Inc. to coordinate the terrestrial environmental studies being performed by the Alaska Department of Fish and Game and, as subcontractors to LGL, several University of Alaska research groups. LGL is responsible for further quantifying the potential impacts of the project on terrestrial wildlife and vegetation, and for developing a plan to mitigate adverse impacts on the terrestrial environment. The impact assessment and mitigation plan will be included as part of a license application to the Federal Energy Regulatory Commission (FERC) scheduled for the first quarter of 1983. The quantification of impacts, mitigation planning, and design of future research is being organized using a computer simulation modelling approach. Through a series of workshops attended by researchers, resource managers, and policy-makers, a computer model is being developed and refined for use in the quantification of impacts on terrestrial wildlife and vegetation, and for evaluating different mitigation measures such as habitat enhancement and the designation of replacement lands to be managed by wildlife habitat. This report describes the preliminary model developed at the first workshop held August 23 -27, 1982 in Anchorage.

  7. Egg Microbiology Basics

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Microbiology is the study of living microorganisms. This includes any single living animal not visible to the naked eye most of which are less than 0.1 mm in diameter. Bacteria, yeasts, molds, viruses, some algae and protozoans are considered microorganisms. Microbiology is a diverse field and fo...

  8. Microbiology of Water.

    ERIC Educational Resources Information Center

    Geldreich, Edwin E.

    1978-01-01

    Presents a literature review of microbiology of water, covering publications of 1967-77. This review covers: (1) microbial indicators of pollution; and (2) microbiology of rivers, potable waters, natural lakes, and impoundments. A list of 192 references is also presented. (HM)

  9. Microbiology, philosophy and education.

    PubMed

    O'Malley, Maureen A

    2016-09-01

    There are not only many links between microbiological and philosophical topics, but good educational reasons for microbiologists to explore the philosophical issues in their fields. I examine three broad issues of classification, causality and model systems, showing how these philosophical dimensions have practical implications. I conclude with a discussion of the educational benefits for recognising the philosophy in microbiology. PMID:27465488

  10. Microbiology of Waste Treatment.

    ERIC Educational Resources Information Center

    Unz, Richard F.

    1978-01-01

    Presents a literature review of the microbiology of waste treatment, covering publications of 1976-77. This review includes topics such as: (1) sanitary microbiology; (2) wastewater disinfectant; (3) viruses in wastewater; and (4) wastewater microbial populations. A list of 142 references is also presented. (HM)

  11. CNR LARA project, Italy: Airborne laboratory for environmental research

    NASA Technical Reports Server (NTRS)

    Bianchi, R.; Cavalli, R. M.; Fiumi, L.; Marino, C. M.; Pignatti, S.

    1995-01-01

    The increasing interest for the environmental problems and the study of the impact on the environment due to antropic activity produced an enhancement of remote sensing applications. The Italian National Research Council (CNR) established a new laboratory for airborne hyperspectral imaging, the LARA Project (Laboratorio Aero per Ricerche Ambientali - Airborne Laboratory for Environmental Research), equipping its airborne laboratory, a CASA-212, mainly with the Daedalus AA5000 MIVIS (Multispectral Infrared and Visible Imaging Spectrometer) instrument. MIVIS's channels, spectral bandwidths, and locations are chosen to meet the needs of scientific research for advanced applications of remote sensing data. MIVIS can make significant contributions to solving problems in many diverse areas such as geologic exploration, land use studies, mineralogy, agricultural crop studies, energy loss analysis, pollution assessment, volcanology, forest fire management and others. The broad spectral range and the many discrete narrow channels of MIVIS provide a fine quantization of spectral information that permits accurate definition of absorption features from a variety of materials, allowing the extraction of chemical and physical information of our environment. The availability of such a hyperspectral imager, that will operate mainly in the Mediterranean area, at the present represents a unique opportunity for those who are involved in environmental studies and land-management to collect systematically large-scale and high spectral-spatial resolution data of this part of the world. Nevertheless, MIVIS deployments will touch other parts of the world, where a major interest from the international scientific community is present.

  12. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    SciTech Connect

    Williams, C.V.; Burford, T.D.; Allen, C.A.

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

  13. Environmental Field Surveys, EMF Rapid Program, Engineering Project No.3

    SciTech Connect

    Enertech Consultants

    1996-04-01

    The EMF Research and Public Information Dissemination Program (RAPID) includes several engineering research in the area of exposure assessment and source characterization. RAPID engineering project No. 3: ''Environmental Field Surveys'' was performed to obtain information on the levels and characteristics of different environments, for which only limited data were available, especially in comparison to magnetic field data for the residential environment and for electric utility facilities, such as power lines and substations. This project was also to provide information on the contribution of various field sources in the surveyed environments. Magnetic field surveys were performed at four sites for each of five environments: schools, hospitals, office buildings, machine shops, and grocery stores. Of the twenty sites surveyed, 11 were located in the San Francisco Bay Area and 9 in Massachusetts. The surveys used a protocol based on magnetic field measurements and observation of activity patterns, designed to provide estimates of magnetic field exposure by type of people and by type of sources. The magnetic field surveys conducted by this project produced a large amount of data which will form a part of the EMF measurement database Field and exposure data were obtained separately for ''area exposure'' and ''at exposure points''. An exposure point is a location where persons engage in fixed, site specific activities near a local source that creates a significant increase in the area field. The area field is produced by ''area sources'', whose location and field distribution is in general not related to the location of the people in the area.

  14. Environmental Assessment: geothermal direct heat project, Marlin, Texas

    SciTech Connect

    Not Available

    1980-08-01

    The Federal action addressed by this Environmental Assessment (EA) is joint funding the retrofitting of a heating and hot water system in a hospital at Marlin, Texas, with a geothermal preheat system. The project will be located within the existing hospital boiler room. One supply well was drilled in an existing adjacent parking lot. It was necessary to drill the well prior to completion of this environmental assessment in order to confirm the reservoir and to obtain fluids for analysis in order to assess the environmental effects of fluid disposal. Fluid from operation will be disposed of by discharging it directly into existing street drains, which will carry the fluid to Park Lake and eventually the Brazos River. Fluid disposal activities are regulated by the Texas Railroad Commission. The local geology is determined by past displacements in the East Texas Basin. Boundaries are marked by the Balcones and the Mexia-Talco fault systems. All important water-bearing formations are in the cretaceous sedimentary rocks and are slightly to highly saline. Geothermal fluids are produced from the Trinity Group; they range from approximately 3600 to 4000 ppM TDS. Temperatures are expected to be above 64/sup 0/C (147/sup 0/F). Surface water flows southeastward as a part of the Brazos River Basin. The nearest perennial stream is the Brazos River 5.6 km (3.5 miles) away, to which surface fluids will eventually discharge. Environmental impacts of construction were small because of the existing structures and paved areas. Construction run-off and geothermal flow-test fluid passed through a small pond in the city park, lowering its water quality, at least temporarily. Construction noise was not out of character with existing noises around the hospital.

  15. Upper Mississippi River ECO-Center Environmental Education Project. First Year Report, Project Year 72-73.

    ERIC Educational Resources Information Center

    Upper Mississippi River ECO-Center, Thomson, IL.

    The proposal describes the history of the Upper Mississippi River ECO-Center Environmental Education Project (funded by Title III, Elementary and Secondary Education Act), Carroll County, Illinois. The goal of the project, which began in July 1972, is to implement and coordinate a comprehensive environmental education program for the county's…

  16. Phase 1 of the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Not Available

    1991-08-01

    The work described in this report was prompted by the public's concern about potential effect from the radioactive materials released from the Hanford Site. The Hanford Environmental Dose Reconstruction (HEDR) Project was established to estimate radiation dose the public might have received from the Hanford Site since 1944, when facilities began operating. Phase 1 of the HEDR Project is a pilot'' or demonstration'' phase. The objectives of this initial phase were to determine whether enough historical information could be found or reconstructed to be used for dose estimation and develop and test conceptual and computational models for calculating credible dose estimates. Preliminary estimates of radiation doses were produced in Phase 1 because they are needed to achieve these objectives. The reader is cautioned that the dose estimates provided in this and other Phase 1 HEDR reports are preliminary. As the HEDR Project continues, the dose estimates will change for at least three reasons: more complete input information for models will be developed; the models themselves will be refined; and the size and shape of the geographic study area will change. This is one of three draft reports that summarize the first phase of the four-phased HEDR Project. This, the Summary Report, is directed to readers who want a general understanding of the Phase 1 work and preliminary dose estimates. The two other reports -- the Air Pathway Report and the Columbia River Pathway Report -- are for readers who understand the radiation dose assessment process and want to see more technical detail. Detailed descriptions of the dose reconstruction process are available in more than 20 supporting reports listed in Appendix A. 32 refs., 46 figs.

  17. Project Management Plan for the Hawaii Geothermal Project Environmental Impact Statement

    SciTech Connect

    Reed, R.M.; Saulsbury, J.W.

    1993-06-01

    In 1990, Congress appropriated $5 million (Pu 101-514) for the State of Hawaii to use in Phase 3 of the Hawaii Geothermal Project (HGP). As defined by the State in its 1990 proposal to Congress, the HGP would consist of four phases: (1) exploration and testing of the geothermal resource associated with the Kilauea Volcano on the Island of Hawaii (the Big Island), (2) demonstration of deep-water power transmission cable technology in the Alenuihaha Channel between the Big Island and Maui, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands (DBED 1990). Because it considered Phase 3 to be research and not project development or construction, Congress indicated that allocation of this funding would not be considered a major federal action under NEPA and would not require an EIS. However, because the project is highly visible, somewhat controversial, and involves a particularly sensitive environment in Hawaii, Congress directed in 1991 (House Resolution 1281) that ''...the Secretary of Energy shall use such sums as are necessary from amounts previously provided to the State of Hawaii for geothermal resource verification and characterization to conduct the necessary environmental assessments and/or environmental impact statement (EIS) for the geothermal initiative to proceed''. In addition, the U.S. District Court of Hawaii (Civil No. 90-00407, June 25, 1991) ruled that the federal government must prepare an EIS for Phases 3 and 4 before any further disbursement of funds was made to the State for the HGP. This Project Management Plan (PMP) briefly summarizes the background information on the HGP and describes the project management structure, work breakdown structure, baseline budget and schedule, and reporting procedures

  18. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    SciTech Connect

    Not Available

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made.

  19. Systems Analysis Approach for the NASA Environmentally Responsible Aviation Project

    NASA Technical Reports Server (NTRS)

    Kimmel, William M.

    2011-01-01

    This conference paper describes the current systems analysis approach being implemented for the Environmentally Responsible Aviation Project within the Integrated Systems Research Program under the NASA Aeronautics Research Mission Directorate. The scope and purpose of these systems studies are introduced followed by a methodology overview. The approach involves both top-down and bottoms-up components to provide NASA s stakeholders with a rationale for the prioritization and tracking of a portfolio of technologies which enable the future fleet of aircraft to operate with a simultaneous reduction of aviation noise, emissions and fuel-burn impacts to our environment. Examples of key current results and relevant decision support conclusions are presented along with a forecast of the planned analyses to follow.

  20. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    SciTech Connect

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  1. Next Generation Microbiology Requirements

    NASA Technical Reports Server (NTRS)

    Ott, C. M.; Oubre, C. M.; Elliott, T. F.; Castro, V. A.; Pierson, D. L.

    2012-01-01

    As humans continue to explore deep into space, microorganisms will travel with them. The primary means to mitigate the risk of infectious disease are a combination of prudent spacecraft design and rigorous operational controls. The effectiveness of these methods are evaluated by microbiological monitoring of spacecraft, food, water, and the crew that is performed preflight, in-flight, and post-flight. Current NASA requirements associated with microbiological monitoring are based on culture-based methodology where microorganisms are grown on a semi-solid growth medium and enumerated. Subsequent identification of the organisms requires specialized labor and large equipment, which historically has been performed on Earth. Requirements that rely strictly on culture-based units limit the use of non-culture based monitoring technology. Specifically, the culture-based "measurement criteria" are Colony Forming Units (CFU, representing the growth of one microorganism at a single location on the agar medium) per a given volume, area, or sample size. As the CFU unit by definition is culture-based, these requirements limit alternative technologies for spaceflight applications. As spaceflight missions such as those to Mars extend further into space, culture-based technology will become difficult to implement due to the (a) limited shelf life of the culture media, (b) mass/volume necessary to carry these consumables, and (c) problems associated with the production of biohazardous material in the habitable volume of the spacecraft. In addition, an extensive amount of new knowledge has been obtained during the Space Shuttle, NASA-Mir, and International Space Station Programs, which gave direction for new or modified microbial control requirements for vehicle design and mission operations. The goal of this task is to develop and recommend a new set of requirements for vehicle design and mission operations, including microbiological monitoring, based upon "lessons learned" and new

  2. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    SciTech Connect

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  3. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    SciTech Connect

    1998-05-01

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

  4. Environmentally Conscious Manufacturing Project: ECM assessment guidance manual

    SciTech Connect

    Not Available

    1994-11-01

    The purpose of this document is to provide a summary of the basic tools that will be used in conducting assessments under the Environmentally Conscious Manufacturing (ECM) Project assessment program. ECM can cover a wide range of issues including: finding safer alternatives to toxic materials; changing processes to become more efficient; environmental costs and regulatory compliance; waste reduction; energy conservation; product packaging; and product reuse/recycling. The assessments performed as part of this program will try to identify opportunities to implement technologies/actions that will promote the types of results listed above. The general methodology, or sequence of events, that will be used in conducting assessments is as follows: 1. Form an Assessment Team; 2. Map Process by flow diagrams and materials accounting; 3. Identify opportunities for ECM by activity based accounting and pareto analysis; 4. Identify and evaluate ECM/pollution prevention alternatives; 5. Implement alternatives; 6. Monitor progress. All of the assessment steps listed above are addressed in this document except forming the assessment team. The tools discussed in this document are well known, widely used process analysis or quality improvement tools which have been adapted for use in evaluating opportunities for ECM/Pollution prevention.

  5. Remediation activities at the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Walsh, T.J.; Danner, R.

    1996-07-01

    The Fernald Environmental Management Project (FEMP) is a United States Department of Energy (DOE) facility located in southwestern Ohio. The facility began manufacturing uranium products in the early 1950`s and continued processing uranium ore concentrates until 1989. The facility used a variety of chemical and metallurgical processes to produce uranium metals for use at other DOE sites across the country. Since the facility manufactured uranium metals for over thirty years, various amounts of radiological contamination exists at the site. Because of the chemical and metallurgical processes employed at the site, some hazardous wastes as defined by the Resource Conservation and Recovery Act (RCRA) were also generated at the site. In 1989. the FEMP was placed on the National Priorities List (NPL) requiring cleanup of the facility`s radioactive and chemical contamination under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This paper discusses the proposed remediation activities at the five Operable Units (OUs) designated at the FEMP. In addition, the paper also examines the ongoing CERCLA response actions and RCRA closure activities at the facility.

  6. Environmental assessment of the Environmental Restoration Project at Sandia National Laboratories/New Mexico

    SciTech Connect

    1996-03-01

    Sandia National Laboratories/New Mexico (SNL/NM) is managed and operated for the U.S. Department of Energy (DOE) by Sandia Corporation, a subsidiary of the Lockheed Martin Company. SNL/NM is located on land controlled by DOE within the boundaries of Kirtland Air Force Base (KAFB) in Albuquerque, New Mexico. The major responsibilities of SNL/NM are the support of national security and energy projects. This report provides an environmental assessment of proposed remedial action activities at the solid waste management units at SNL/NM. A risk assessment of health hazards is also discussed.

  7. 42 CFR 137.301 - How are project and program environmental review costs identified?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction Nepa Process § 137.301 How are project and program environmental review costs identified? (a) The... identified during the performance of the construction project, the Self-Governance Tribe or, at the request... 42 Public Health 1 2010-10-01 2010-10-01 false How are project and program environmental...

  8. Environmental Projects of Jewish and Arab Youth in Israel: The Adult Leaders' Views

    ERIC Educational Resources Information Center

    Alkaher, Iris; Tal, Tali

    2011-01-01

    Socio-environmental projects involving Arab and Jewish youth in Israel are uncommon. In this study, we interviewed 16 adult leaders of two projects that were carried out in the Galilee in northern Israel, to better understand the views of the leaders and their motives. The two projects focused on mutual environmental issues and dealt with social,…

  9. Meeting Environmental Guidelines and Completing School Construction Projects on Time and Within Budget.

    ERIC Educational Resources Information Center

    Preyar, Chester F.

    2000-01-01

    Taxpayers expect school-construction projects to be managed efficiently and in accordance with environmental standards. Phases include selecting an architect and site, stating project requirements, working with the architect, considering environmental factors, getting budget estimates and reviews, and choosing a contractor and project-schedule…

  10. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells Hydrolectric Project In accordance with the National Environmental... reviewed the application for license for the Wells Hydroelectric Project (FERC No. 2149), located on...

  11. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    SciTech Connect

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10{sup 9} electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE`s National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE`s evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc.

  12. Subsurface Microbiology and Biogeochemistry

    SciTech Connect

    Fredrickson, Jim K.; Fletcher, Madilyn

    2001-05-01

    Jim contributed a chapter to this book, in addition to co-editing it with Madilyn Fletcher. Fredrickson, J. K., and M. Fletcher. (eds.) 2001 Subsurface Microbiology and Biogeochemistry. Wiley-Liss, Inc., New York.

  13. Microbiology in Introductory Biology.

    ERIC Educational Resources Information Center

    Callery, Michael L.; And Others

    1980-01-01

    Describes a microbiology unit developed for an introductory college biology course in which the identity of an unknown bacterium is determined. Also described is an interactive taxonomy computer program which aids in the identity of the unknown organism. (CS)

  14. Decisionmaking in Environmental Education: Notes from Research in the Dutch NME-VO Project.

    ERIC Educational Resources Information Center

    De Jager, Henk; van der Loo, Frans

    1990-01-01

    The Dutch project on environmental education, which features decision making on environmental issues within its teaching materials, is described. The results of research done on teaching units entitled "Meat" and "Fuel" are outlined. (CW)

  15. Preoperational Environmental Survey for the Spent Nuclear Fuel (SNF) Project Facilities

    SciTech Connect

    MITCHELL, R.M.

    2000-09-28

    This document represents the report for environmental sampling of soil, vegetation, litter, cryptograms, and small mammals at the Spent Nuclear Fuel Project facilities located in 100 K and 200 East Areas in support of the preoperational environmental survey.

  16. Preoperational Environmental Survey for the Spent Nuclear Fuel (SNF) Project Facilities

    SciTech Connect

    MITCHELL, R.M.

    2000-10-12

    This document represents the report for environmental sampling of soil, vegetation, litter, cryptograms, and small mammals at the Spent Nuclear Fuel Project facilities located in 100 K and 200 East Areas in support of the preoperational environmental survey.

  17. Sustainable Urban Waters: Opportunities to Integrate Environmental Protection in Multi-objective Projects

    EPA Science Inventory

    Abstract: Nonpoint source pollution is an ongoing challenge for environmental agencies who seek to protect waters of the U.S. Urban stream and waterfront redevelopment projects present opportunities to achieve integrated environmental, economic, and social benefits in urban water...

  18. 78 FR 43183 - Notice of Availability for Sharpe Permit Relinquishment Project Environmental Assessment Finding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... Availability (NOA) for Sharpe Permit Relinquishment Project Environmental Assessment (EA) Finding of No... Federal Register (78 FR 25258-25259) announcing the publication of the Sharpe Permit Relinquishment... environmental assessment, David Rodriquez, Director, DLA Installation Support, concludes the proposed action...

  19. Clinical Microbiology Informatics

    PubMed Central

    Sintchenko, Vitali; Rauch, Carol A.; Pantanowitz, Liron

    2014-01-01

    SUMMARY The clinical microbiology laboratory has responsibilities ranging from characterizing the causative agent in a patient's infection to helping detect global disease outbreaks. All of these processes are increasingly becoming partnered more intimately with informatics. Effective application of informatics tools can increase the accuracy, timeliness, and completeness of microbiology testing while decreasing the laboratory workload, which can lead to optimized laboratory workflow and decreased costs. Informatics is poised to be increasingly relevant in clinical microbiology, with the advent of total laboratory automation, complex instrument interfaces, electronic health records, clinical decision support tools, and the clinical implementation of microbial genome sequencing. This review discusses the diverse informatics aspects that are relevant to the clinical microbiology laboratory, including the following: the microbiology laboratory information system, decision support tools, expert systems, instrument interfaces, total laboratory automation, telemicrobiology, automated image analysis, nucleic acid sequence databases, electronic reporting of infectious agents to public health agencies, and disease outbreak surveillance. The breadth and utility of informatics tools used in clinical microbiology have made them indispensable to contemporary clinical and laboratory practice. Continued advances in technology and development of these informatics tools will further improve patient and public health care in the future. PMID:25278581

  20. Hanford Environmental Dose Reconstruction Project, Quarterly report, September--November 1993

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1993-12-31

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates); Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  1. Hanford Environmental Dose Reconstruction Project. Quarterly report, June--August 1993

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1993-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  2. Hanford Environmental Dose Reconstruction Project. Quarterly report, December 1993--February 1994

    SciTech Connect

    Cannon, S.D.

    1994-04-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radio-nuclides followed from release to impact on humans(dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, agriculture; environmental pathways; and dose estimates.

  3. 76 FR 20657 - Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Wells Hydrolectric Project and Intention To Hold Public Meetings...

  4. Projects at the Western Environmental Technology Office. Quarterly technical progress report, April 1--June 30, 1995

    SciTech Connect

    1995-08-01

    This report contains brief outlines of the multiple projects under the responsibility of the Western Environmental Technology Office in Butte Montana. These projects include biomass remediation, remediation of contaminated soils, mine waste technology, and several other types of remediation.

  5. The role of SEPs--supplemental environmental projects

    SciTech Connect

    Umberger, N.

    1995-12-01

    The newest weapons in EPA`s arsenal for ensuring compliance multimedia pollution control and pollution prevention are Supplemental Environmental Projects--SEPs, which are being introduced into enforcement negotiations with willing industrial dischargers. SEPs allow EPA to reach beyond the compliance milepost and require industry to do more and spend more than required to reach compliance. Innovative technologies, best management practices (BMPs) and pollution prevention measures can be implemented through SEPs. SEPs involve monetary and time commitments beyond the fine for violating environmental statues, such as the Clean Water Act. SEPs can redirect expenditures to active efforts to clean up the environment. SEPs can allow industry to conduct compliance audits, demonstrate innovative technologies, and implement pollution prevention methods. A company can demonstrate its commitment to the environment, gain positive PR, and accomplish desirable economic activities through the proposal of favorable SEPs. On the other hand, EPA can use SePs to compel actions contrary to the company`s business strategy. EPA can use SEPs to require specific corrective measures, expand the focus of compliance determinations to beyond the facility in question, or mandate a multimedia compliance initiative. SEPs also allow EPA to move beyond its outdated command and control mindset and the reliance on end-of-pipe pollution controls. SEPs can serve as a reward to local, state, and regional agencies who cooperate with compliance and enforcement initatives. The Agency policy on the inclusion of SEPs in compliance and enforcement negotiations is being revised by the newly-reorganized and expanded Office of Enforcement. Industry needs to request a seat at the table. Industry has the opportunity to advise EPA to adopt a policy that allows SEPs to be utilized in a manner advantageous to industry, while also satisfying EPA`s objectives.

  6. Learning through Teaching: A Microbiology Service-Learning Experience †

    PubMed Central

    Webb, Ginny

    2016-01-01

    Service learning is defined as a strategy in which students apply what they have learned in the classroom to a community service project. Many educators would agree that students often learn best through teaching others. This premise was the motivation for a new service-learning project in which undergraduate microbiology students developed and taught hands-on microbiology lessons to local elementary school children. The lessons included teaching basic information about microbes, disease transmission, antibiotics, vaccines, and methods of disease prevention. This service-learning project benefitted the college students by enforcing their knowledge of microbiology and provided them an opportunity to reach out to children within their community. This project also benefitted the local schools by teaching the younger students about microbes, infections, and handwashing. In this paper, I discuss the development and implementation of this new microbiology service-learning project, as well as the observed impact it had on everyone involved. PMID:27047598

  7. 42 CFR 137.329 - What environmental considerations must be included in the construction project agreement?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SELF-GOVERNANCE Construction Project Assumption Process § 137.329 What environmental considerations must be included in the construction project agreement? The construction project agreement must include... in the construction project agreement? 137.329 Section 137.329 Public Health PUBLIC HEALTH...

  8. 42 CFR 137.329 - What environmental considerations must be included in the construction project agreement?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in the construction project agreement? 137.329 Section 137.329 Public Health PUBLIC HEALTH SERVICE... SELF-GOVERNANCE Construction Project Assumption Process § 137.329 What environmental considerations must be included in the construction project agreement? The construction project agreement must...

  9. 77 FR 21722 - Gore Creek Restoration Project; Intent To Prepare an Environmental Impact Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... Forest Service Gore Creek Restoration Project; Intent To Prepare an Environmental Impact Statement AGENCY: Medicine Bow-Routt National Forests, Forest Service, USDA. Project: Gore Creek Restoration Project. ACTION... proposed Gore Creek Restoration Project (Gore Creek). The Gore Creek analysis area...

  10. Symbiosis in the Soil: Citizen Microbiology in Middle and High School Classrooms †

    PubMed Central

    McKenney, Erin; Flythe, Taylar; Millis, Courtney; Stalls, Jennifer; Urban, Julie M.; Dunn, Robert R.; Stevens, Julia L.

    2016-01-01

    Microorganisms are vital to environmental health, yet their association with disease often overshadows these benefits. Building citizen-science activities around the positive role of microorganisms and an understanding of their ubiquity can begin to dispel misconceptions while simultaneously engaging the public in research. Here, we describe a citizen-science microbiology project geared toward implementation in middle and high school classrooms. Students culture environmental microorganisms and document microbial diversity of plant root systems compared with adjacent bulk soil. Results contribute data toward research on microbiome recruitment of weeds and other successful plants while addressing core topics in science education. PMID:27047592

  11. Symbiosis in the Soil: Citizen Microbiology in Middle and High School Classrooms.

    PubMed

    McKenney, Erin; Flythe, Taylar; Millis, Courtney; Stalls, Jennifer; Urban, Julie M; Dunn, Robert R; Stevens, Julia L

    2016-03-01

    Microorganisms are vital to environmental health, yet their association with disease often overshadows these benefits. Building citizen-science activities around the positive role of microorganisms and an understanding of their ubiquity can begin to dispel misconceptions while simultaneously engaging the public in research. Here, we describe a citizen-science microbiology project geared toward implementation in middle and high school classrooms. Students culture environmental microorganisms and document microbial diversity of plant root systems compared with adjacent bulk soil. Results contribute data toward research on microbiome recruitment of weeds and other successful plants while addressing core topics in science education. PMID:27047592

  12. A microbiological view of sterile service production.

    PubMed

    Atfield, R D

    1991-06-01

    The primary purpose of a Sterile Services Department is the prevention of infection. A specific guide to Good Manufacturing Practice (GMP) has been published by the Institute of Sterile Service Management to assist managers to ensure that the final products are of the nature and quality intended. The testing and monitoring of machinery, such as autoclaves, has an obvious microbiological relevance but other practices, such as expire dates and presterilization of used items, are of dubious microbiological advantage and can act against the main aim. GMP recommendations on environmental controls have received disproportionate attention to the remainder of the document, particularly relating to packing rooms. The standard should not be seen as a primarily microbiological measure but as a sensible control to limit the ingress of unwanted dust, flies and people and provide basic ventilation. Tests indicate that the standard for particle counts can be achieved without structural alteration in some departments. Microbiological counts are similar to those within operating theatres and additional protective clothing is of no apparent advantage. Process failure is the main cause of risks to the patient, and other practices, although both relevant and important, should not be given a false microbiological significance as these can detract and distract attention from the main issue. PMID:1679826

  13. Children as Community Planners: Report on an Environmental Design Project 1.

    ERIC Educational Resources Information Center

    Hanley, Gerard L.; And Others

    1981-01-01

    Describes a six-month project emphasizing participant-observation teaching strategy in which a third-grade class of 24 students employed methods of environmental design to design communities within a modern forest and more primitive tundra and desert regions. Discusses project goals, results, and implications for future use of environmental design…

  14. 77 FR 24976 - Environmental Impact Statement for the Proposed Wheatgrass Ridge Wind Project, Fort Hall Indian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... the proposed action, was published in the Federal Register on June 2, 2011 (76 FR 31975). The Draft... Bureau of Indian Affairs Environmental Impact Statement for the Proposed Wheatgrass Ridge Wind Project... on the Environmental Impact Statement (EIS) for the proposed Wheatgrass Ridge Wind Project on...

  15. 75 FR 7029 - Notice of Availability of the Final Environmental Assessment for Solar Roof Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-16

    ... Geological Survey Notice of Availability of the Final Environmental Assessment for Solar Roof Project AGENCY..., the US Geological Survey (USGS) has prepared a Final Environmental Assessment for the Solar Roof... for the Solar Roof Project should immediately contact the USGS S.O. Conte Anadromous Fish...

  16. 76 FR 76121 - Revised Notice, Draft Environmental Impact Statement, Rosemont Copper Project on the Coronado...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ..., Coronado National Forest, published a Notice of Availability of the Rosemont Copper Project Draft Environmental Impact Statement and public meetings and commenting options (76 FR 64893). This revised notice... Forest Service Revised Notice, Draft Environmental Impact Statement, Rosemont Copper Project on...

  17. 76 FR 64991 - Environmental Assessment for the I-395 Air Rights Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-19

    ... Federal Highway Administration Environmental Assessment for the I-395 Air Rights Project AGENCY: Federal... Department of Transportation are announcing the availability for public review of the Environmental Assessment (EA) prepared for the I-395 Air Rights Projects in conjunction with the District Department...

  18. ECP (Environmental Conservation Project) Report, No. 8, December 1976. ECP State Bibliography.

    ERIC Educational Resources Information Center

    Dean, Norman L., Ed.

    This issue of the Environmental Conservation Project (ECP) Report contains the second supplement to the "ECP State Bibliography," a collection of state energy legislation compiled by the Energy Conservation Project at the Environmental Law Institute. Earlier publications of state legislative actions appear in the October 1975 and January 1976…

  19. Phase 1 of the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Not Available

    1990-07-20

    For more than 40 years, the US government made plutonium for nuclear weapons at the Hanford Site in southeastern Washington State. Radioactive materials were released to both the air and water from Hanford. People could have been exposed to these materials, called radionuclides. The Hanford Environmental Dose Reconstruction (HEDR) Project is a multi-year scientific study to estimate the radiation doses the public may have received as a results of these releases. The study began in 1988. During the first phase, scientists began to develop and test methods for reconstructing the radiation doses. To do this, scientists found or reconstructed information about the amount and type of radionuclides that were released from Hadford facilities, where they traveled in environment, and how they reached people. Information about the people who could have been exposed was also found or reconstructed. Scientists then developed a computer model that can estimate doses from radiation exposure received many years ago. All the information that had been gathered was fed into the computer model. Then scientists did a test run'' to see whether the model was working properly. As part of its test run,'' scientists asked the computer model to generate two types of preliminary results: amounts of radionuclides in the environment (air, soil, pasture grass, food, and milk) and preliminary doses people could have received from all the routes of radiation exposure, called exposure pathways. Preliminary dose estimates were made for categories of people who shared certain characteristics and for the Phase 1 population as a whole. 26 refs., 48 figs.

  20. Bridging Environmental Education Trans-Atlantic: An American and Hungarian Teacher In-service Project.

    ERIC Educational Resources Information Center

    Brown, Fletcher; Blank, Lisa

    2001-01-01

    Reviews a teacher training project that brought together 20 teachers from Hungary and the United States to develop and implement an environmental education curriculum. Initially, the teachers differed in their definitions of environmental education, teaching, and curriculum reform. By the end, teacher definitions of environmental education…

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  3. Hanford Environmental Dose Reconstruction Project. Quarterly report, April--May 1993

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1993-06-01

    The objective of the Hanford Environment Dose Reconstruction (HEDR) Project is to estimate the radiation dose that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; and, environmental pathways and dose estimates.

  4. Final Project Summary Report Bechtel Nevada and Fiberchem Environmental, Inc., Cooperative Research and Technology Development Project

    SciTech Connect

    R. J. Pollina

    1999-04-01

    This is a report summarizing work on a small project dedicated to adapting a new chemical sensing platform for the US Department of Energy and its customers. At the same time and in the spirit of technology transfer, FCI Environmental, Inc., would receive technical support in the form of expertise from the US Department of Energy to assist in developing this product. The sensor is a hybrid integrated-circuit, optical waveguide, chemical sensor that is patented by FCI Environmental, Inc., and manufactured under license by Texas Instruments, Inc. A down-hole penetrometer probe was designed for use in hot, 60 C, hydrocarbon-saturated, saline environment at a depth of 200 feet. The probe design includes three chemical sensing, hybrid integrated-circuits with chemical reference and measurement channels, a water seal, output electronics, and a removable measurement head for replacement in the field. A hand-held chemical detector prototype--containing a hybrid integrated-circuit chemical sensor with reference channel, user alarm, and level display--was designed and constructed, and a software interface developed to operate the hand-held sensor interfaced with a laboratory data acquisition system.

  5. Environmental Friendly Coatings and Corrosion Prevention For Flight Hardware Project

    NASA Technical Reports Server (NTRS)

    Calle, Luz

    2014-01-01

    Identify, test and develop qualification criteria for environmentally friendly corrosion protective coatings and corrosion preventative compounds (CPC's) for flight hardware an ground support equipment.

  6. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... process for construction projects? 137.294 Section 137.294 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT... SELF-GOVERNANCE Construction Nepa Process § 137.294 What is the typical IHS environmental review process for construction projects? (a) Most IHS construction projects normally do not have a...

  7. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... process for construction projects? 137.294 Section 137.294 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT... SELF-GOVERNANCE Construction Nepa Process § 137.294 What is the typical IHS environmental review process for construction projects? (a) Most IHS construction projects normally do not have a...

  8. 75 FR 23798 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... Minerals Management Service Environmental Assessment Prepared for Proposed Cape Wind Energy Project in...), announces the availability of an EA and FONNSI for the Cape Wind Energy Project proposed for Nantucket Sound... Impact Statement (FEIS) for the Cape Wind Energy Project. The FEIS assessed the physical, biological,...

  9. 77 FR 45597 - Middle Fork American River Project; Notice of Availability of the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... Energy Regulatory Commission Middle Fork American River Project; Notice of Availability of the Draft Environmental Impact Statement for the Middle Fork American River Hydrolectric Project and Intention To Hold... CFR part 380 ), the Office of Energy Projects has reviewed the application for license for the...

  10. 78 FR 13660 - Middle Fork American River Project; Notice of Availability of the Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... Energy Regulatory Commission Middle Fork American River Project; Notice of Availability of the Final Environmental Impact Statement for the Middle Fork American River Hydrolectric Project In accordance with the... Projects has reviewed the application for license for the Middle Fork American River Hydroelectric...

  11. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-13

    ... (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has... Energy Regulatory Commission Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings...

  12. Microbiology of ensiling

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Recent advances in our understanding of silage microbiology are reviewed. The ability to extract microbial DNA from silages, amplify portions of DNA, and then separate those portions by the strains of microorganisms that have produced them has been at the core of the changes that have occurred recen...

  13. Microbiology--Safety Considerations.

    ERIC Educational Resources Information Center

    Hoffmann, Sheryl K.

    This paper discusses the risk assessment associated with microbiology instruction based on grade level, general control measures, appropriate activities for middle school and high school students, the preparation and sterilization of equipment, and safe handling techniques. Appended are instructions and figures on making wire loops and the…

  14. Making Microbiology Even Smaller!

    ERIC Educational Resources Information Center

    Young, Linda Mull; Motz, Vicki Abrams

    2013-01-01

    We outline protocols for producing slant-minis (SLINIs) and mini-deeps (MEEPs) and examples of their use in simple microbiology experiments suitable for high school students. The principal benefits of these protocols are decreased cost associated with significantly reduced media use; easier, less expensive disposal of waste; and increased safety…

  15. Microbiological test results of the environmental control and life support systems vapors compression distillation subsystem recycle tank components following various pretreatment protocols

    NASA Technical Reports Server (NTRS)

    Huff, Tim

    1993-01-01

    Microbiological samples were collected from the recycle tank of the vapor compression distillation (VCD) subsystem of the water recovery test at NASA MSFC following a 68-day run. The recycle tank collects rejected urine brine that was pretreated with a commercially available oxidant (Oxone) and sulfuric acid and pumps it back to the processing component of the VCD. Samples collected included a water sample and two swab samples, one from the particulate filter surface and a second from material floating on the surface of the water. No bacteria were recovered from the water sample. Both swab samples contained a spore-forming bacterium, Bacillus insolitus. A filamentous fungus was isolated from the floating material. Approximately 1 month after the pretreatment chemicals were changed to sodium hypochlorite and sulfuric acid, a swab of the particulate filter was again analyzed for microbial content. One fungus was isolated, and spore-forming bacteria were observed. These results indicate the inability of these pretreatments to inhibit surface attachment. The implications of the presence of these organisms are discussed.

  16. Environmental impact assessment of Attenda abattoir, Ogbomoso southwestern Nigeria on surface and groundwater quality using geo-electrical imaging and microbiological analysis.

    PubMed

    Adelowo, Olawale Olufemi; Akinlabi, Ismail A; Fagade, Obasola Ezekiel

    2012-07-01

    The impact of Attenda abattoir, Ogbomoso southwestern Nigeria on four water sources was investigated using geoelectrical imaging and microbiological analysis. 2D electrical resistivity imaging indicated groundwater contamination by leachate from the abattoir. Electrical resistivity values measured by the traverse run directly on the waste dump and other areas impacted by the waste from the abattoir are generally very low (6.68-16.7 Ωm) in comparison to other positions (135-288 Ωm). The total viable bacteria count of the water samples ranged from 0.49 × 10(6) to 2.85 × 10(8) cfu/ml and all samples are contaminated with coliforms with the most probable number (MPN)/100 ml ranging from 110 to ≥ 1,600 MPN/100 ml. Among bacteria isolated from the study site (n = 95), resistance to eight antibiotics ranged from 35.8% to 94%. In addition, 85% of Streptococcus agalactiae (n = 31) and Staphylococci (n = 9) showed haemolytic activity while 92% of all isolates showed β-lactamase activity. These results suggest that operations of the abattoir may impact negatively on surrounding aquatic ecosystem and endanger the health of surrounding residents who use water from the wells for domestic purposes. Furthermore, such aquatic ecosystems may serve as reservoir of antibiotic resistant bacteria. PMID:22105848

  17. Environmental Education through Watershed Studies: Budd/Deschutes Project GREEN.

    ERIC Educational Resources Information Center

    Lewis, Lisa Bryce

    1992-01-01

    Describes the development and current status of the Global Rivers Environmental Education Network, cited as an exemplary Environmental Education program in the Pacific northwest. It is an international educational effort that provides a means for improving local and global water quality through hands-on monitoring and local problem solving for…

  18. Uranium Mill Tailings Remedial Action Project Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1992-11-01

    The Department of Energy (DOE) has issued requirements for complying with DOLE and other Federal agency environmental regulations. DOE Order 5400.1 requires environmental monitoring plans for each DOE operation that uses, generates, releases, or manages pollutants of radioactive and hazardous materials.

  19. Environmental Education Study Projects for High School Students.

    ERIC Educational Resources Information Center

    Wert, Jonathan M.

    This paper has been designed as a general guide to the teacher, student, group, or club interested in identifying environmental or resource problems at the community level and helping to find solutions to them. The paper discusses the independent studies program as a method of studying environmental problems as well as a source of academic credit.…

  20. Environmental Education in Germany: Concepts, History, Projects, Visions.

    ERIC Educational Resources Information Center

    Tapia, Ivan, Ed.; Blochmann, Georg, Ed.

    2000-01-01

    This document presents the history of environmental education in Germany and reports on the diversions and solutions in the search for sustainable education. Five sections include: (1) "Environmental Education: Learning with All One's Senses"; (2) "Sustainability as the New Model: Knowledge of a New Quality"; (3) "Tomorrow's Education in…

  1. Project Galaxy - Sustianable Resource Supply and Environmental Implications

    SciTech Connect

    Downing, Mark; Wimmer, Robert

    2012-03-01

    Understanding what it takes to move from a corn-based liquid fuels industry to one that is cellulosic-based requires a complex transition over time. This transition implies, among other things, a shift from annual cropping systems considered under United States Department of Agriculture (USDA) policy as commodity crops, to perennial lignocellulosic crops that are herbaceous and wood-based. Because of changes in land use as well as biomass and other crop supplies, land-based environmental amenities such as water quality, soil health and tilth, air quality, and animal and avian species populations and their diversity change also. Environmental effects are measured as magnitudes (how much they are impacted), and direction of the impact (either positive or negative). By developing a series of quantitative and qualitative metrics, the larger issue of defining relative sustainability may be addressed, and this can be done at a finer detail of regional (scale) and environmental amenity-specific impacts. Although much literature exists about research relevant to specific environmental variables, there is no published, documented, nor research literature on direct application of environmental over-compliance with regards a 'biorefinery.' Our three goals were to (1) understand and quantify bioenergy sustainability and some key environmental effects in a generic set of examples; (2) explain the effort and means to define and quantify specific qualitative environmental measures, and to determine a way to understand changes in these measures over time and what their implications might be; and (3) use these outcomes to evaluate potential sites in any geographic area. This would permit assessment of candidate locations, combined with an understanding of co-production of fuels, chemicals, and electric power, to interpret sustainability measures and the relationship between environmental sustainability and economic sustainability. The process of determining environmental

  2. Environmental changes and microbiological health risks. Satellite-derived turbidity: an indicator of "health hazard" for surface water in West Africa (Bagre lake, Burkina Faso).

    NASA Astrophysics Data System (ADS)

    Robert, E.; Grippa, M.; Kergoat, L.; Martinez, J.; Pinet, S.; Gal, L.; Soumaguel, N.

    2015-12-01

    A significant correlation exists between the concentration of parasites, bacteria and some water quality parameters including surface suspended solids (SSS) and turbidity. Suspended particles can carry viruses and pathogenic bacteria affecting human health and foster their development. High SSS, associated with high turbidity, can therefore be considered as a vector of microbiological contaminants, causing diarrheal diseases. Few studies have focused on the turbidity parameter in rural Africa, while many cases of intestinal parasitic infections are due to the consumption of unsafe water from ponds, lakes, and rivers. Monitoring turbidity may therefore contribute to health hazard monitoring. Turbidity refers to the optical properties of water and is known to impact water reflectance in the visible and near-infrared domain. Ideally, its spatial and temporal variability requires the use of high temporal resolution (MODIS) and spatial resolution (Landsat, SPOT, Sentinel-2). Here we investigate turbidity in West-Africa. Various algorithms and indices proposed in the literature for inland waters are applied to MODIS series and to Landsat 7 and 8 CDR images, and SPOT5 images. The data and algorithms are evaluated with field measurements: turbidity, SSS, and hyperspectral ground radiometry. We show that turbidity of the Bagre Lake displays a strong increase over 2000-2015, associated with the corresponding increase of the red and NIR reflectances, as well as a reduction of the seasonal variations. Water level derived from the Jason 2 altimeter does not explain such variations. The most probable hypothesis is a change in land use (increase in bare and degraded soils), that leads to an increase in the particles transported by surface runoff to the lake. Such an increase in turbidity reinforces the health risk. We will discuss the link between turbidity and health in view of data from health centers on diarrheal diseases as well as data on practices and uses of populations.

  3. Microbiology operations and facilities aboard restructured Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis A.; Mishra, S. K.; Pierson, Duane L.

    1992-01-01

    With the restructure and funding changes for Space Station Freedom, the Environmental Health System (EHS)/Microbiology Subsystem revised its scheduling and operational requirements for component hardware. The function of the Microbiology Subsystem is to monitor the environmental quality of air, water, and internal surfaces and, in part, crew health on board Space Station. Its critical role shall be the identification of microbial contaminants in the environment that may cause system degradation, produce unsanitary or pathogenic conditions, or reduce crew and mission effectiveness. EHS/Microbiology operations and equipment shall be introduced in concert with a phased assembly sequence, from Man Tended Capability (MTC) through Permanently Manned Capability (PMC). Effective Microbiology operations and subsystem components will assure a safe, habitable, and useful spacecraft environment for life sciences research and long-term manned exploration.

  4. Environmental Assessment: Winnett School District Boiler Replacement Project

    SciTech Connect

    Not Available

    1994-07-01

    This environmental assessment analyzes the environmental impacts of replacing the Winnett School District complex`s existing oil-fired heating system with a new coal-fired heating system with funds provided from a grant under the Institutional Conservation Program. This Assessment has been prepared in accordance with the provisions of the National Environmental Policy Act (NEPA), the Council on Environmental Quality`s regulations; the Department`s Implementing Procedures and Guidelines Revocation; and the May 1993 ``Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements,`` by the Department`s Office of NEPA Oversight. Under the Institutional Conservation Programs, created by the National Energy Conservation Policy Act (PL 95--619), the Department is authorized to encourage energy conservation-by providing funding for up to 50 percent of the costs of installation of qualified energy conservation measures by entities such as schools, hospitals, and other buildings owned by local governments. This proposed action to fund partially the installation of a new coal-fired heating system for the Winnett School District is part of this energy conservation program.

  5. Summer Undergraduate Research Program: Environmental studies

    SciTech Connect

    McMillan, J.

    1994-12-31

    The purpose of the summer undergraduate internship program for research in environmental studies is to provide an opportunity for well-qualified students to undertake an original research project as an apprentice to an active research scientist in basic environmental research. The students are offered research topics at the Medical University in the scientific areas of pharmacology and toxicology, epidemiology and risk assessment, environmental microbiology, and marine sciences. Students are also afforded the opportunity to work with faculty at the University of Charleston, SC, on projects with an environmental theme. Ten well-qualified students from colleges and universities throughout the eastern United States were accepted into the program.

  6. Environmental impact assessments of the Three Gorges Project in China: Issues and interventions

    NASA Astrophysics Data System (ADS)

    Xu, Xibao; Tan, Yan; Yang, Guishan

    2013-09-01

    The paper takes China's authoritative Environmental Impact Statement for the Yangzi (Yangtze) Three Gorges Project (TGP) in 1992 as a benchmark against which to evaluate emerging major environmental outcomes since the initial impoundment of the Three Gorges reservoir in 2003. The paper particularly examines five crucial environmental aspects and associated causal factors. The five domains include human resettlement and the carrying capacity of local environments (especially land), water quality, reservoir sedimentation and downstream riverbed erosion, soil erosion, and seismic activity and geological hazards. Lessons from the environmental impact assessments of the TGP are: (1) hydro project planning needs to take place at a broader scale, and a strategic environmental assessment at a broader scale is necessary in advance of individual environmental impact assessments; (2) national policy and planning adjustments need to react quickly to the impact changes of large projects; (3) long-term environmental monitoring systems and joint operations with other large projects in the upstream areas of a river basin should be established, and the cross-impacts of climate change on projects and possible impacts of projects on regional or local climate considered.

  7. Environmental considerations for international projects in coastal waters

    SciTech Connect

    Ryan, P.J.; Kubanis, S.A.

    1994-12-31

    From the industrial revolution until the late 1960s, development and the environment were largely viewed as mutually exclusive. In the late 1960s a change in public awareness and attitude emerged, and since the U.N Conference on the Human Environment in 1972 there has been a significant change in the global perception of the relationship between the environment and development. Recognition that renewable resources, such as forests, atmospheric oxygen, and soil, can be harvested indefinitely through sound management practices has led to the current focus on sustainable development. When the National Environmental Policy Act was adopted in 1969, a comprehensive environmental management process was set in place. The impact of these regulations was felt by different industries at different levels, with the initial brunt being borne by the power industry, followed by the petroleum industry. In recent years the mining industry has been heavily impacted. Although industry has been increasingly regulated in the US since 1969, development in many other countries was not subject to environmental review or regulation. In recent years, however, this picture has changed dramatically. Currently, most other industrialized, and many developing countries have environmental laws, regulations, and review processes in place. For example, Indonesia, Thailand, Republic of China, Ecuador, Venezuela, Saudi Arabia, and Russia all have environmental laws, standards, and/or review requirements applicable to petroleum and other industrial developments. Most Western European and Pacific Rim countries have environmental standards and review processes in place. In Eastern Europe, Asia and South America, about half of the countries have regulations, and in Africa a small but growing number of countries have some level of environmental regulation.

  8. Short Mountain Landfill Gas Recovery Project : Stage 1 Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Bonneville Power Administration (BPA), a Federal power marketing agency, has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. BPA`s latest load/resource balance forecast, projects the capability of existing resources to satisfy projected Federal system loads. The forecast indicates a potential resource deficit. The underlying need for action is to satisfy BPA customers` demand for electrical power.

  9. Newberry Geothermal Pilot Project : Final Environmental Impact Statement.

    SciTech Connect

    US Forest Service; US Bureau of Land Management; US Bonneville Power Administration

    1994-09-01

    BPA has decided to acquire 20 average megawatts (aMW) of electrical power from a privately-owned geothermal power plant on the west flank of Newberry Volcano in Deschutes County, Oregon. The Newberry Project will generate 30 aMW and will be developed, owned, and operated by CE Newberry, Inc. of Portland, Oregon. In addition, BPA has decided to grant billing credits to EWEB for 10 aMW of electrical power and to provide wheeling services to EWEB for the transmission of this power to their system. BPA expects the Newberry Project to be in commercial operation by November 1997. BPA has statutory responsibilities to supply electrical power to its utility industrial and other customers in the Pacific Northwest. The Newberry Project will be used to meet the electrical power supply obligations of these customers. The Newberry Project will also demonstrate the availability of geothermal power to meet power supply needs in the Pacific Northwest and is expected to be the first commercial geothermal plant in the region. The Newberry Project was selected under the BPA Geothermal Pilot Project Program. The goal of the Program is to initiate development of the Pacific Northwest`s large, but essentially untapped, geothermal resources, and to confirm the availability of this resource to meet the energy needs of the region. The primary underlying objective of this Program is to assure the supply of alternative sources of electrical power to help meet growing regional power demands and needs.

  10. 76 FR 63342 - Environmental Impact Statement, Tappan Zee Hudson River Crossing Project (Rockland and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... Federal Highway Administration Environmental Impact Statement, Tappan Zee Hudson River Crossing Project... proposed infrastructure improvements for the Tappan Zee Hudson River crossing in Rockland and Westchester... alternatives to improve the transportation infrastructure of the Tappan Zee Hudson River crossing....

  11. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    SciTech Connect

    Deffenbaugh, M.L.

    1998-05-28

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464.

  12. Environmental Assessment and Finding of No Significant Impact: Kalina Geothermal Demonstration Project Steamboat Springs, Nevada

    SciTech Connect

    N /A

    1999-02-22

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA) to provide the DOE and other public agency decision makers with the environmental documentation required to take informed discretionary action on the proposed Kalina Geothermal Demonstration project. The EA assesses the potential environmental impacts and cumulative impacts, possible ways to minimize effects associated with partial funding of the proposed project, and discusses alternatives to DOE actions. The DOE will use this EA as a basis for their decision to provide financial assistance to Exergy, Inc. (Exergy), the project applicant. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human or physical environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  13. Microbiological analysis of cosmetics.

    PubMed

    Herrera, Anavella Gaitan

    2004-01-01

    Cosmetics are products of chemical or natural origin dedicated specifically for use in skin and mucosa. The constant development of the cosmetic industry has generated the necessity to carry out microbiological analysis on the raw materials used in the industrial production of cosmetics as well as the final products, with the purpose of obtaining products of good microbiological quality. Cosmetic products are recognized to be substrates for the survival and development of a large variety of microorganisms, since they possess some of the nutrients that facilitate growth such as: lipids, polysaccharides, alcohol, proteins, amino acids, glucosides, esteroids, peptides, and vitamins. Also, the conditions of readiness (oxygenation, pH, temperature, osmotic degree, superficial activity, perfume, and essential oils) present in the cosmetic products favor microbial multiplication. Routine analyses to determine the microbiological quality of a cosmetic product include the following: Count of mesophilic aerobic microorganisms. Most probable number (MPN) of total coliforms. Count of molds and yeasts. Absence/presence of Staphylococcus aureus probe. Absence/presence of Pseudomonas aeruginosa probe. PMID:15156038

  14. Environmental assessment. Downhole steam generator field test project DEEP STEAM: enhanced oil recovery project (DOE No. 16), Kern County, California

    SciTech Connect

    Church, H.W.; Zak, B.D.

    1980-02-01

    Objective of DEEP STEAM is to develop the technology to economically produce heavy oil from reservoirs greater than 760 m deep using steam injection. The proposed site is in the Kern River Oil Field in the San Joaquin Valley. This document describes the project, existing environment, and possible impact of the project. It is concluded that the proposed action does not significantly affect the quality of the environment, and therefore an environmental impact statement is not required. (DLC)

  15. Richland Environmental Restoration Project Fiscal Year 2000--2002 Detailed Work Plan -- Surveillance/Maintenance and Transition Project

    SciTech Connect

    Swan, K.N.

    1999-09-29

    The US Department of Energy (DOE), Richland Operations Office (RL), directed Hanford Site contractors to update multi-year work plans in accordance with the guidance provided to them. The Richland Environmental Restoration Project continued the Detailed Work Plan update approach that was approved in fiscal year 1998. This Detailed Work Plan provides the cost, scope, and schedule for the FY00 through FY02 activities required to support the Surveillance/Maintenance and Transition Project.

  16. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  17. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public... Management Assessment of Environmental Issues § 102-80.75 Who assesses environmental issues in Federal construction and lease construction projects? Federal agencies must assess required environmental...

  18. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public... Management Assessment of Environmental Issues § 102-80.75 Who assesses environmental issues in Federal construction and lease construction projects? Federal agencies must assess required environmental...

  19. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public... Management Assessment of Environmental Issues § 102-80.75 Who assesses environmental issues in Federal construction and lease construction projects? Federal agencies must assess required environmental...

  20. Successful Application of Active Learning Techniques to Introductory Microbiology

    PubMed Central

    HOFFMAN, ELIZABETH A.

    2001-01-01

    While the traditional lecture format may be a successful way to teach microbiology to both medical and nursing students, it was not an effective means of learning for many prenursing and preprofessional students enrolled in either of the introductory microbiology courses at Ashland Community College, an open enrollment institution. The structure of both Medical Microbiology and Principles of Microbiology was redesigned to allow students to address the material in an active manner. Daily quizzes, student group discussions, scrapbooks, lab project presentations and papers, and extra credit projects were all added in order to allow students maximum exposure to the course material in a manner compatible with various methods of learning. Student knowledge, course evaluations, and student success rates have all improved with the active learning format. PMID:23653538

  1. Environmental projects. Volume 1: Polychlorinated biphenyl (PCB) abatement program

    NASA Technical Reports Server (NTRS)

    Kushner, L.

    1987-01-01

    Six large parabolic dish antennas are located at the Goldstone Deep Space Communications Complex north of Barstow, California. Some of the ancillary electrical equipment of thes Deep Space Stations, particularly transformers and power capicitors, were filled with stable, fire-retardant, dielectric fluids containing substances called polychlorobiphenyls (PCBs). Because the Environmental Protection Agency has determined that PCBs are environmental pollutants toxic to humans, all NASA centers have been asked to participate in a PCB-abatement program. Under the supervision of JPL's Office of Telecommunications and Data Acquisition, a two-year long PCB-abatement program has eliminated PCBs from the Goldstone Complex.

  2. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  3. Environmental Assessment and (FONSI) Winnett School District Boiler Replacement Project.

    ERIC Educational Resources Information Center

    Department of Energy, Washington, DC.

    An analysis is presented of the environmental impacts of replacing the Winnett School District's existing oil-fired heating system with a new coal-fired heating system with funds provided from a grant under the Institutional Conservation Program. The report first covers the background and need for action, along with the alternative actions…

  4. Facts of Environmental Life (FEL): A Projective Counseling Technique.

    ERIC Educational Resources Information Center

    Golden, James R.; Parker, Joseph P.

    This paper presents the Facts of Environmental Life (FEL), a counseling technique which incorporates the action sociogram and the Adlerian concept of purposeful behavior. The use of the FEL materials, i.e., a life space board, standing figures of varying sizes, and blocks and barricades representing emotional blocks, is illustrated. Instructions…

  5. The Social Justice, Peace, and Environmental Education Standards Project

    ERIC Educational Resources Information Center

    Andrzejewski, Julie

    2005-01-01

    Inspired by the Alaska Native Knowledge Network's "Standards for Culturally Responsive Schools," members of fourteen social justice, peace, and environmental education (SJPEE) special interest groups (SIGs) from the American Educational Research Association (AERA) and several other prominent organizations have been involved in drafting SJPEE…

  6. Environmental Project Provides Work Experience for Rural Youth

    ERIC Educational Resources Information Center

    Meier, Amy L.; Smith, Marilyn; Usinger, Janet

    2010-01-01

    Bootstraps is a 12-week program designed for rural youth, ages 18-21, who are not working and not in school. The program goal is for participants to develop skills and motivation to find meaningful work, which is accomplished through a combination of classroom learning and practical fieldwork. The environmental fieldwork on public lands, funded by…

  7. ENVIRONMENTAL ASSESSMENT OF GEOPRESSURED WATERS AND THEIR PROJECTED USES

    EPA Science Inventory

    A possible source of alternate energy for the nation is believed to exist in the deep geopressured reservoirs found in the Texas and Louisiana Gulf Coast sedimentary basins. This report considers the potential uses of the geopressured geothermal resource and the environmental asp...

  8. Project Overview: PERCHLORATE ENVIRONMENTAL CONTAMINATION - TOXICOLOGICAL REVIEW AND RISK CHARACTERIZATION

    EPA Science Inventory

    The human health and ecological assessment issues related to environmental contamination by perchlorate are complex and continue to emerge. Perchlorate, ClO4-, is an anion that originates as a contaminant from the solid salts of ammonium, potassium or sodium perchlorate. These ...

  9. Environmental Audit, Rifle, Gunnison and Grand Junction UMTRA Project Sites

    SciTech Connect

    Not Available

    1991-08-01

    This report documents the results of the comprehensive baseline Environmental Audit completed for the Uranium Mill Tailings Remedial Action (UMTRA) sites at Grand Junction, Rifle, and Gunnison, Colorado. Included in the Audit were the actual abandoned mill sites, associated transportation and disposal cell facilities, and representative examples of the more than 4,000 known vicinity properties. Sites investigated include: Climax Mill Site, Truck/Train Haul Route, Cotter Transfer Station, Cheney Disposal Cell, Rifle Mill Sites (Old and New Rifle), Gunnison Mill Site, Vicinity Properties, and Estes Gulch and Proposed Landfill Site No. 1 Disposal Cells. The UMTRA Audit was a comprehensive baseline audit which considered all environmental programs and the activities associated with ongoing and planned remediation at the UMTRA sites listed above. Compliance with the National Environmental Policy Act (NEPA) was not considered during this investigation. The Audit Team looked at the following technical disciplines: air, surface water/drinking water, groundwater, soil/sediment/biota, waste management, toxic and chemical materials, quality assurance, radiation, inactive waste sites, and environmental management. 6 figs., 12 tabs.

  10. Simple Assessment Techniques for Soil and Water. Environmental Factors in Small Scale Development Projects. Workshops.

    ERIC Educational Resources Information Center

    Coordination in Development, New York, NY.

    This booklet was produced in response to the growing need for reliable environmental assessment techniques that can be applied to small-scale development projects. The suggested techniques emphasize low-technology environmental analysis. Although these techniques may lack precision, they can be extremely valuable in helping to assure the success…

  11. Integrating Project-Based Service-Learning into an Advanced Environmental Chemistry Course

    ERIC Educational Resources Information Center

    Draper, Alison J.

    2004-01-01

    An active service-learning research work is conducted in the field of advanced environmental chemistry. Multiple projects are assigned to students, which promote individual learning skills, self-confidence as scientists, and a deep understanding of the environmental chemist's profession.

  12. The ILSI-HESI Project on Animal Alternative Needs in Environmental Risk Assessment

    EPA Science Inventory

    The ILSI Health and Environmental Sciences Institute (HESI) established a project in 2009 on Animal Alternatives in Environmental Risk Assessment (AA-ERA) following a successful two-year emerging issues assessment of the topic. The early stages of this work included the execution...

  13. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    SciTech Connect

    West Valley Environmental Services LLC and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  14. Searching for the Seventies: Photographs from the Environmental Protection Agency's DOCUMERICA Project

    ERIC Educational Resources Information Center

    Bustard, Bruce; Potter, Lee Ann

    2013-01-01

    In 1971, the newly established Environmental Protection Agency (EPA) created DOCUMERICA, a federal government photography project born out of the nation's environmental crisis. The photographers hired by the EPA took thousands of photographs depicting pollution, waste, and blight, but they were given the freedom to capture the era's…

  15. Microbiological monitoring in geothermal plants

    NASA Astrophysics Data System (ADS)

    Alawi, M.; Lerm, S.; Vetter, A.; Vieth, A.; Seibt, A.; Wolfgramm, M.; Würdemann, H.

    2009-12-01

    In times of increasing relevance of alternative energy resources the utilization of geothermal energy and subsurface energy storage gains importance and arouses increasing interest of scientists. The research project “AquiScreen” investigates the operational reliability of geothermally used groundwater systems under microbial, geochemical, mineralogical and petrological aspects. Microbiological analyses based on fluid and solid phases of geothermal systems are conducted to evaluate the impact of microbial populations on these systems. The presentation focuses on first results obtained from microbiological monitoring of geothermal plants located in two different regions of Germany: the North German Basin and the Molasse Basin in the southern part characterized by different salinities and temperatures. Fluid and filter samples taken during regular plant operation were investigated using genetic fingerprinting based on PCR-amplified 16S rRNA genes to characterize the microbial biocenosis of the geothermal aquifer. Sequencing of dominant bands of the fingerprints and the subsequent comparison to 16S rRNA genes from public databases enables a correlation to metabolic classes and provides information about the biochemical processes in the deep biosphere. The genetic profiles revealed significant differences in microbiological community structures of geothermal aquifers investigated. Phylogenetic analyses indicate broad metabolical diversity adapted to the specific conditions in the aquifers. Additionally a high amount of so far uncultivated microorganisms was detected indicating very specific indigenous biocenosis. However, in all geothermal plants bacteria were detected despite of fluid temperatures from 45° to 120°C. The identified microorganisms are closely related to thermophilic and hyperthermophilic species detectable in hot wells and hot springs, like Thermus scotoductus and Thermodesulfovibrio yellowstonii, respectively. Halophilic species were detected in

  16. 42 CFR 137.301 - How are project and program environmental review costs identified?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE... development to identify program and project related costs associated with carrying out environmental responsibilities for proposed projects. The goal in this process is to identify the costs associated with...

  17. The 5th World Environmental Education Congress, 2009: A Research Project

    ERIC Educational Resources Information Center

    Jickling, Bob; Sauve, Lucie; Briere, Laurence; Niblett, Blair; Root, Emily

    2010-01-01

    This paper contextualizes the 5th World Environmental Education Congress, discusses the theoretical underpinnings of the Congress theme "Earth Our Common Home," and relates this theorizing to the research project that was woven through the Congress. We provide a rationale for engaging in this research project, as an invitation for Congress…

  18. Environmentally Sound Small-Scale Livestock Projects. Guidelines for Planning Series Number 5.

    ERIC Educational Resources Information Center

    Jacobs, Linda

    This document was developed in response to the need for simplified technical information for planning environmentally sound small-scale projects in third world countries. It is aimed specifically at those who are planning or managing small-scale livestock projects in less-developed areas of the tropics and sub-tropics. The guidelines included in…

  19. Integrating Project-Based Service-Learning into an Advanced Environmental Chemistry Course

    NASA Astrophysics Data System (ADS)

    Draper, Alison J.

    2004-02-01

    In an advanced environmental chemistry course, the inclusion of semester-long scientific service projects successfully integrated the research process with course content. Each project involved a unique community-based environmental analysis in which students assessed an aspect of environmental health. The projects were due in small pieces at even intervals, and students worked independently or in pairs. Initially, students wrote a project proposal in which they chose and justified a project. Following a literature review of their topic, they drafted sampling and analysis plans using methods in the literature. Samples were collected and analyzed, and all students assembled scientific posters describing the results of their study. In the last week of the semester, the class traveled to a regional professional meeting to present the posters. In all, students found the experience valuable. They learned to be professional environmental chemists and learned the value of the discipline to community health. Students not only learned about their own project in depth, but they were inspired to learn textbook material, not for an exam, but because it helped them understand their own project. Finally, having a community to answer to at the end of the project motivated students to do careful work.

  20. The Project-Approach to GIS as an Integrative Classroom Technology: An Environmental Case Study.

    ERIC Educational Resources Information Center

    Gatrell, Jay D.; Oshiro, Kenji K.

    2001-01-01

    Explains how Geographic Information Systems (GIS) influences geography curricula and how project-based learning can be applied to GIS experiences. Introduces a project investigating non-geography college students' design and implementation of a environmental GIS application. (Contains 16 references.) (YDS)

  1. Project Method, as One of the Basic Methods of Environmental Education

    ERIC Educational Resources Information Center

    Szállassy, Noémi

    2008-01-01

    Our aim was to present in this paper the one of the most important methods of environmental education, the project method. We present here the steps and phases of project method and we give an example of how to use these elements in planning an activity for celebrating the World Day for Water.

  2. A New Project-Based Lab for Undergraduate Environmental and Analytical Chemistry

    ERIC Educational Resources Information Center

    Adami, Gianpiero

    2006-01-01

    A new project-based lab was developed for third year undergraduate chemistry students based on real world applications. The experience suggests that the total analytical procedure (TAP) project offers a stimulating alternative for delivering science skills and developing a greater interest for analytical chemistry and environmental sciences and…

  3. Taking Action: An Educator's Guide to Involving Students in Environmental Projects

    ERIC Educational Resources Information Center

    Council for Environmental Education, 2012

    2012-01-01

    Developed in cooperation with the World Wildlife Fund, "Taking Action" inspires ideas and provides models for conducting effective environmental projects--projects that dynamically engage students from start to finish. From adopting species to protecting habitats to saving energy and creating publications, this guide will help educators plan,…

  4. The Environmental Scanning Project at the University of Georgia Center for Continuing Education.

    ERIC Educational Resources Information Center

    Morrison, James L.; And Others

    The environmental scanning project at the University of Georgia Center for Continuing Education is described. The project attempts to identify signals of change in all sectors of the external environment. Information resources have been selected from the social, technological, economic, and political aspects of the environment at the…

  5. The environmental control and life support system advanced automation project

    NASA Technical Reports Server (NTRS)

    Dewberry, Brandon S.

    1991-01-01

    The objective of the ECLSS Advanced Automation project includes reduction of the risk associated with the integration of new, beneficial software techniques. Demonstrations of this software to baseline engineering and test personnel will show the benefits of these techniques. The advanced software will be integrated into ground testing and ground support facilities, familiarizing its usage by key personnel.

  6. Project I-C-E Adopter Handbook: Environmental Education.

    ERIC Educational Resources Information Center

    Cooperative Educational Service Agency 9, Green Bay, WI.

    This document is intended for use by potential adopters of Project I-C-E (Instruction-Curriculum-Environment). Items include sample curriculum materials and examples of information often necessary when making application to a National Diffusion Network state facilitator or for E.S.E.A. Title IV-C Adopter/Adapter Grants. Also covered are elements…

  7. Environmentally Sound Small-Scale Forestry Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Ffolliott, Peter F.; Thames, John L.

    This manual, the third in a series of publications that address community development possibilities in developing nations, provides guidelines for small-scale forestry projects that are integrative and conservation-oriented. Chapters focus on: (1) users and uses (specifying targeted audience and general objectives); (2) planning process (including…

  8. Environmental Responses to a Land Reclamation Project in South Korea

    NASA Astrophysics Data System (ADS)

    Son, SeungHyun; Wang, Menghua

    2009-11-01

    In 1991, South Korea embarked on an ambitious project to reclaim nearly 401 square kilometers of land and tidal flats from the Yellow Sea by building a system of two dikes extending 33 kilometers across the mouths of the Dongjin and Mangyeong rivers, offshore of the Saemangeum district (see Figures 1a and 1b). Called the Saemangeum Reclamation Project, the endeavor will allot about 283 square kilometers of the reclaimed land for crop production (mostly rice) through irrigation of the rivers’ estuaries, which will be extended by about 23 kilometers when the bay fills up. The rest of the reclaimed land will be a water reservoir for agricultural use [Lie et al., 2008]. The construction of the Saemangeum Reclamation Project's northern dike was completed in June 2003; the southern dike was finished in April 2006. Two gaps in the southern dike allow water exchange, and two gates control the water level inside the dikes. The reclamation project, the biggest such endeavor in South Korea, is expected to be completed around 2030.

  9. Project Management Approach to Transition of the Miamisburg Closure Project From Environmental Cleanup to Post-Closure Operations

    SciTech Connect

    Carpenter, C.P.; Marks, M.L.; Smiley, S.L.; Gallaher, D.M.; Williams, K.D.

    2006-07-01

    The U.S. Department of Energy (DOE) used a project management approach to transition the Miamisburg Closure Project from cleanup by the Office of Environmental Management (EM) to post-closure operations by the Office of Legacy Management (LM). Two primary DOE orders were used to guide the site transition: DOE Order 430.1B, Real Property Asset Management, for assessment and disposition of real property assets and DOE Order 413.3, Program and Project Management for Acquisition of Capital Assets, for project closeout of environmental cleanup activities and project transition of post-closure activities. To effectively manage these multiple policy requirements, DOE chose to manage the Miamisburg Closure Project as a project under a cross-member transitional team using representatives from four principal organizations: DOE-LM, the LM contractor S.M. Stoller Corporation, DOE-EM, and the EM contractor CH2M Hill Mound Inc. The mission of LM is to manage the Department's post-transition responsibilities and long-term care of legacy liabilities and to ensure the future protection of human health and the environment for cleanup sites after the EM has completed its cleanup activities. (authors)

  10. Project Orion, Environmental Control and Life Support System Integrated Studies

    NASA Technical Reports Server (NTRS)

    Russell, James F.; Lewis, John F.

    2008-01-01

    Orion is the next vehicle for human space travel. Humans will be sustained in space by the Orion subystem, environmental control and life support (ECLS). The ECLS concept at the subsystem level is outlined by function and technology. In the past two years, the interface definition with other subsystems has increased through different integrated studies. The paper presents the key requirements and discusses three recent studies (e.g., unpressurized cargo) along with the respective impacts on the ECLS design moving forward.

  11. Advanced Mixed Waste Treatment Project (AMWTP) Final Environmental Impact Statement

    SciTech Connect

    1999-02-12

    The AMWTP Final EIS assesses the potential environmental impacts associated with alternatives related to the construction and operation of a proposed waste treatment facility at the INEEL. The alternatives analyzed were: the No Action Alternative, the Proposed Action, the Non-Thermal Treatment Alternative, and the Treatment and Storage Alternative. The Proposed Action is the Preferred Alternative. Under the Proposed Action/Preferred Alternative, the AMWTP facility would treat transuranic waste, alpha-contaminated low-level mixed waste, and low-level mixed waste in preparation for disposal. After treatment, transuranic waste would be disposed of at the Waste Isolation Pilot Plant in New Mexico. Low-level mixed waste would be disposed of at an approved disposal facility depending on decisions to be based on DOE's Final Waste Management Programmatic Environmental Impact Statement. Evaluation of impacts on land use, socioeconomics, cultural resources, aesthetic and scenic resources, geology, air resources, water resources, ecological resources, noise, traffic and transportation, occupational and public health and safety, INEEL services, and environmental justice were included in the assessment.

  12. Test Area North Pool Stabilization Project: Environmental assessment

    SciTech Connect

    1996-05-01

    The Test Area North (TAN) Pool is located within the fenced TAN facility boundaries on the Idaho National Engineering Laboratory (INEL). The TAN pool stores 344 canisters of core debris from the March, 1979, Three Mile Island (TMI) Unit 2 reactor accident; fuel assemblies from Loss-of-Fluid Tests (LOFT); and Government-owned commercial fuel rods and assemblies. The LOFT and government owned commercial fuel rods and assemblies are hereafter referred to collectively as {open_quotes}commercial fuels{close_quotes} except where distinction between the two is important to the analysis. DOE proposes to remove the canisters of TMI core debris and commercial fuels from the TAN Pool and transfer them to the Idaho Chemical Processing Plant (ICPP) for interim dry storage until an alternate storage location other than at the INEL, or a permanent federal spent nuclear fuel (SNF) repository is available. The TAN Pool would be drained and placed in an industrially and radiologically safe condition for refurbishment or eventual decommissioning. This environmental assessment (EA) identifies and evaluates environmental impacts associated with (1) constructing an Interim Storage System (ISS) at ICPP; (2) removing the TMI and commercial fuels from the pool and transporting them to ICPP for placement in an ISS, and (3) draining and stabilizing the TAN Pool. Miscellaneous hardware would be removed and decontaminated or disposed of in the INEL Radioactive Waste Management Complex (RWMC). This EA also describes the environmental consequences of the no action alternative.

  13. Environmental projects, volume 11. Environmental assessment: Addition to operations building, Mars site

    NASA Technical Reports Server (NTRS)

    1990-01-01

    An Environmental Assessment was performed of the proposed addition to building G-86 at the Mars Site, which will provide space for new electronic equipment to consolidate the Deep Space Network (DSN) support facilities from other Goldstone Deep Space Communication Complex (GDSCC) sites at the Mars Site, and will include a fifth telemetry and command group with its associated link monitor, control processor, and operator consoles. The addition of these facilities will increase the capability of the DSN to support future sophisticated NASA spacecraft missions such as the International Solar and Terrestrial Physics (ISTP) Program. The planned construction of this building addition requires an Environmental Assessment (EA) document that records the existing environmental conditions at the Mars Site, that analyzes the environmental effects that possibly could be expected from the construction and use of the new building addition, and that recommends measures to be taken to mitigate any possible deleterious environmental effects.

  14. Software Development Plan for DESCARTES and CIDER. Hanford Environmental Dose Reconstruction Project: Version 1.0

    SciTech Connect

    Eslinger, P.W.

    1992-12-08

    This Software Development Plan (SDP) outlines all software activities required to obtain functional environmental accumulation and individual dose codes for the Hanford Environmental Dose Reconstruction (HEDR) project. The modeling activities addressed use the output of the air transport-code HATCHET to compute radionuclide concentrations in environmental pathways, and continue on through calculations of dose for individuals. The Hanford Environmental Dose Reconstruction (HEDR) Project has a deliverable in the June 1993 time frame to be able to start computing doses to individuals from nuclear-related activities on the Hanford Site during and following World War II. The CIDER code will compute doses and their uncertainties for individuals living in the contaminated environment computed by DESCARTES. The projected size of the code is 3000 lines.

  15. The Radon Project: A Study in Environmental Hazard Education.

    ERIC Educational Resources Information Center

    Himes, Lori; And Others

    1996-01-01

    An extension project sold 4,000 radon kits; 46% were returned for testing and 23% of homes were at risk. Interviews with 100 of those at risk found that only 41% believed they had a problem; women and college graduates were more likely than men and high school graduates to believe it. Of those who believed they had a problem, only 63% took any…

  16. Improving Environmental Literacy through GO3 Citizen Science Project

    NASA Astrophysics Data System (ADS)

    Wilkening, B.

    2011-12-01

    In the Global Ozone (GO3) Project students measure ground-level ozone on a continuous basis and upload their results to a global network used by atmospheric scientists and schools. Students learn important concepts such as chemical measurement methods; instrumentation; calibration; data acquisition using computers; data quality; statistics; data analysis and graphing; posting of data to the web; the chemistry of air pollution; stratospheric ozone depletion and global climate change. Students collaborate with researchers and other students globally in the GO3 network. Wilson K-8 School is located in a suburban area in Pima County, Arizona. Throughout the year we receive high ozone alert days. Prior to joining the GO3 project, my students were unaware of air pollution alerts, risks and causes. In the past when Pima County issued alerts to the school, they were posted on signs around the school. No explanation was provided to the students and the signs were often left up for days. This discounted the potential health effects of the situation, resulting in the alerts effectively being ignored. The GO3 project is transforming both my students and our school community. Now my students are:

    • Performing science research
    • Utilizing technology and increasing their skills
    • Collaborating in a responsible manner on the global GO3 social network
    • Communicating their work to the community
    • Issuing their own ozone alerts to their school
    • Advocating for actions that will improve air quality
    My students participation in this citizen science project is creating a more cognizant and active community in regards to air pollution.

  17. Yakima Fisheries Project : Revised Draft Environmental Impact Statement, Summary.

    SciTech Connect

    Confederated Tribes and Bands of the Yakama Nation, Washington; Washington . Dept. of Fish and Wildlife.

    1995-05-01

    The Bonneville Power Administration (BPA) proposes to fund the Yakima Fisheries Project (YFP) to undertake fishery research and enhancement activities in the Yakima River Basin. The State of Washington and the Yakima Indian Nation would jointly direct the project. The Yakima River system is a promising location for mitigation and enhancement to compensate for stock losses from development and operation of hydroelectric projects elsewhere in the Columbia Basin. The YFP would help determine the role that supplementation might play in increasing natural production of anadromous salmonids throughout the Columbia Basin. In cooperation with BPA, the project managers propose to construct, operate and maintain anadromous (e.g. salmon) fish production facilities. The goal is to conduct research activities designed to increase knowledge of supplementation techniques. These techniques would be applied to rebuild naturally spawning anadromous fish stocks historically present in the Yakima River Basin and, ultimately, those throughout the Columbia River Basin. Eventually, the YFP might involve the supplementation of all stocks of anadromous fish known to have occurred in the Yakima Basin. However, at this time only two alternatives have been proposed: Alternative 1 would supplement depressed naturally spawning populations of upper Yakima spring chinook salmon; Alternative 2 (preferred) would include all actions under Alternative 1; it would also add a study to determine the feasibility of re-establishing a naturally spawning population and a significant fall fishery for coho salmon in the Yakima Basin. (Coho smolts are currently being imported from another basin under the Columbia River Basin Fish Management Plan; the stock is now virtually eliminated from the Basin.)

  18. Structuring Free-text Microbiology Culture Reports For Secondary Use

    PubMed Central

    Yim, Wen-wai; Evans, Heather L.; Yetisgen, Meliha

    2015-01-01

    Microbiology lab culture reports are a frequently used diagnostic tool for clinical providers. However, their incorporation into clinical surveillance applications and evidence-based medicine can be severely hindered by the free-text nature of these reports. In this work, we (1) created a microbiology culture template to structure free-text microbiology reports, (2) generated an annotated microbiology report corpus, and (3) built a microbiology information extraction system. Specifically, we combined rule-based, hybrid, and statistical techniques to extract microbiology entities and fill templates for structuring data. System performances were favorable, with entity f1-score 0.889 and relation f1-score 0.795. We plan to incorporate these extractions as features for our ongoing ventilator-associated pneumonia surveillance project, though this tool can be used as an upstream process in other applications. Our newly created corpus includes 1442 unique gram stain and culture microbiology reports generated from a cohort of 715 patients at the University of Washington Medical Facilities. PMID:26306288

  19. Yakima Fisheries Project : Final Environmental Impact Statement : Summary.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    The Bonneville Power Administration (BPA) proposes to fund the Yakima Fisheries Project (YFP) to undertake fishery research and mitigation activities in the Yakima River Basin. The State of Washington and the Yakama Indian Nation (YIN) would jointly direct the project. In cooperation with BPA, the project managers propose to construct, operate and maintain anadromous (e.g. salmon) fish production facilities The goal is to conduct research activities designed to increase knowledge of supplementation techniques. These techniques would be applied to rebuild naturally spawning anadromous fish stocks historically present in the Yakima River Basin and, ultimately, those throughout the Columbia River Basin. Eventually, the YFP might involve the supplementation of all stocks of anadromous fish known to have occurred in the Yakima Basin. However, at this time only two action alternatives have been proposed, in addition to the No Action alternative: Alternative (1) would supplement depressed naturally spawning populations of upper Yakima spring chinook salmon; Alternative (2) (preferred) would include all actions under Alternative 1; it would also add a study to determine the feasibility of re-establishing a naturally spawning population and a significant fall fishery for coho salmon in the Yakima Basin (Coho smolts are currently being imported from another basin under the Columbia River Basin Fish Management Plan; the stock is now virtually eliminated from the Basin.)

  20. Zaporozhye aluminum smelter: Ukraine modernization and environmental protection project. Feasibility study report. Export trade information

    SciTech Connect

    1995-07-01

    The report shows the results of a feasibility study conducted for the modernization and environmental protection systems proposed for the Zaporozhye Aluminum Smelter. The study reviews the overall technological and environmental improvement programs for the final design details for potcell modifications. Also covered is a review of project implementation for the best possible construction technique to minimize production loss as well as strategic investment plans to secure project financing from financial institutions. The report is divided into the following sections: (1) Executive Summary; (2) Introduction; (3) Existing Facilities at ZALK and its Fixed Assets; (4) Plant Modernization Project; (5) Environmental Control and Fume Treatment System; (6) Market Study; (7) Plant Organization and Manning; (8) Project Implementation Strategy; (9) Economical and Financial Analysis.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    SciTech Connect

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  3. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Klenk, David P.

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  4. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    SciTech Connect

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  5. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    SciTech Connect

    West Valley Environmental Services LLC and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  6. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner, II, Robert E.; Fox, James R.; Hoch, Jerald J.; Werchowski, Rebecca L.

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  7. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    SciTech Connect

    1996-08-08

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  8. [Microbiological diagnosis of viral respiratory infections].

    PubMed

    Eiros, José M; Ortiz de Lejarazu, Raúl; Tenorio, Alberto; Casas, Inmaculada; Pozo, Francisco; Ruiz, Guillermo; Pérez-Breña, Pilar

    2009-03-01

    Acute respiratory infection is the most common disease occurring over a person's lifetime, with etiological variations determined mainly by age, environmental circumstances, the healthcare setting, and the underlying pathology. More than 200 different viruses distributed in six viral families have been implicated in the pathogenesis of respiratory tract infection. These facts are generating an increasing diagnostic demand that should be incorporated into the healthcare setting without delay. To meet this demand, the Spanish Society of Infectious Diseases and Clinical Microbiology has updated its Standard Procedure for the microbiological diagnosis of viral respiratory infection. This document contains an update primarily of infections caused by influenza viruses, and secondarily, infections due to other conventional and emerging respiratory viruses. In all cases, the methods for direct virological diagnosis (cell culture, and detection of antigens and nucleic acid) are reviewed, with special reference to techniques for molecular detection and genetic characterization. PMID:19306718

  9. Environmental projects. Volume 14: Removal of contaminated soil and debris

    NASA Technical Reports Server (NTRS)

    Kushner, Len

    1992-01-01

    Numerous diverse activities at the Goldstone Deep Space Communications Complex (GDSCC) are carried out in support of six parabolic dish antennas. Some of these activities can result in possible spills or leakages of hazardous materials and wastes stored both above ground in steel drums and below ground in underground storage tanks (UST's). These possible leaks or spills, along with the past practice of burial of solid debris and waste in trenches and pits, could cause local subsurface contamination of the soil. In 1987, the Jet Propulsion Laboratory (JPL), retained Engineering-Science, Inc. (E-S), Pasadena, California, to identify the specific local areas within the GDSCC with subsurface soil contamination. The E-S study determined that some of the soils at the Apollo Site and the Mars Site were contaminated with hydrocarbons, while soil at a nonhazardous waste dumpsite at the Mojave Base site was contaminated with copper. This volume is a JPL-expanded version of the PE209 E-S report, and it also reports that all subsurface contaminated soils at the GDSCC were excavated, removed, and disposed of in an environmentally acceptable way, and the excavations were backfilled and covered in accordance with accepted Federal, State, and local environmental rules and regulations.

  10. Coastal Aquifer Response to Environmental Change - Implications for Future Projections

    NASA Astrophysics Data System (ADS)

    Post, V.

    2014-12-01

    Coastal aquifers are important resources for water supply, and are increasingly stressed by population increase and the growing water demand for irrigation and other uses. Concern exists that these current pressures will be compunded by the adverse impacts of future environmental change, in particular sea-level rise. Numerous studies have investigated the effect of the expected sea-level rise durring the 21st century on the salintiy distribution in coastal groundwater systems. In many of these studies, the predicted changes due to an increase in sea level are typically seen as a departure from a steady-state situation. But many other studies have provided abundant evidence that groundwater systems in coastal areas are not in equilibrium with the present-day boundary conditions, i.e., coastline configuration and climate. This is borne out by, for example, the salinity distribution of groundwater, which does not obey the classical configuration of an intruded wedge of seawater extending inland from the coastline. This paper will argue that coastal aquifers systems are in a continuous state of transition. The relevance of future environmental change within the context of long-term trends will be discussed and exemplified by case studies of coastal aquifers in different parts of the world. It will be argued that the conceptualization of coastal groundwater systems, and in particular the connection between their onshore and offshore parts, is a major source of uncertainty in studies that aim to quantify the impact of sea-level rise on coastal groundwater resources.

  11. Environmental Projects. Volume 8: Modifications of wastewater evaporation ponds

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Goldstone Deep Space Communications Complex (GDSCC), located in the Mojave Desert about 45 miles north of Barstow, California, and about 160 miles northeast of Pasadena, is part of NASA's Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. The Goldstone Complex is managed, technically directed, and operated for NASA by the Jet Propulsion Laboratory (JPL) of the California Institute of Technology in Pasadena, California. Activities at the GDSCC are carried out in support of seven parabolic dish antennas. These activities may give rise to environmental hazards: use of hazardous chemicals, asbestos, and underground storage tanks as well as the generation of hazardous wastes and the disposal of wastewater. Federal, state, and local laws governing the management of hazardous substances, asbestos, underground storage tanks and wastewater disposal have become so complex there is a need to devise specific programs to comply with the many regulations that implement these laws. In support of the national goal of the preservation of the environment and the protection of human health and safety, NASA, JPL, and the GDSCC have adopted a position that their operating installations shall maintain a high level of compliance with these laws. One of the environmental problems at the GDSCC involved four active, operational, wastewater evaporation ponds designed to receive and evaporate sewage effluent from upstream septic tank systems. One pair of active wastewater evaporation ponds is located at Echo Site, while another operational pair is at Mars Site.

  12. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    SciTech Connect

    1999-02-01

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

  13. Uranium Mill Tailings Remedial Action Project Environmental Monitoring Plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1992-11-01

    The Department of Energy (DOE) has issued requirements for complying with DOLE and other Federal agency environmental regulations. DOE Order 5400.1 requires environmental monitoring plans for each DOE operation that uses, generates, releases, or manages pollutants of radioactive and hazardous materials.

  14. Yakima Fisheries Project : Revised Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  15. Water microbiology. Bacterial pathogens and water.

    PubMed

    Cabral, João P S

    2010-10-01

    Water is essential to life, but many people do not have access to clean and safe drinking water and many die of waterborne bacterial infections. In this review a general characterization of the most important bacterial diseases transmitted through water-cholera, typhoid fever and bacillary dysentery-is presented, focusing on the biology and ecology of the causal agents and on the diseases' characteristics and their life cycles in the environment. The importance of pathogenic Escherichia coli strains and emerging pathogens in drinking water-transmitted diseases is also briefly discussed. Microbiological water analysis is mainly based on the concept of fecal indicator bacteria. The main bacteria present in human and animal feces (focusing on their behavior in their hosts and in the environment) and the most important fecal indicator bacteria are presented and discussed (focusing on the advantages and limitations of their use as markers). Important sources of bacterial fecal pollution of environmental waters are also briefly indicated. In the last topic it is discussed which indicators of fecal pollution should be used in current drinking water microbiological analysis. It was concluded that safe drinking water for all is one of the major challenges of the 21st century and that microbiological control of drinking water should be the norm everywhere. Routine basic microbiological analysis of drinking water should be carried out by assaying the presence of Escherichia coli by culture methods. Whenever financial resources are available, fecal coliform determinations should be complemented with the quantification of enterococci. More studies are needed in order to check if ammonia is reliable for a preliminary screening for emergency fecal pollution outbreaks. Financial resources should be devoted to a better understanding of the ecology and behavior of human and animal fecal bacteria in environmental waters. PMID:21139855

  16. Water Microbiology. Bacterial Pathogens and Water

    PubMed Central

    Cabral, João P. S.

    2010-01-01

    Water is essential to life, but many people do not have access to clean and safe drinking water and many die of waterborne bacterial infections. In this review a general characterization of the most important bacterial diseases transmitted through water—cholera, typhoid fever and bacillary dysentery—is presented, focusing on the biology and ecology of the causal agents and on the diseases’ characteristics and their life cycles in the environment. The importance of pathogenic Escherichia coli strains and emerging pathogens in drinking water-transmitted diseases is also briefly discussed. Microbiological water analysis is mainly based on the concept of fecal indicator bacteria. The main bacteria present in human and animal feces (focusing on their behavior in their hosts and in the environment) and the most important fecal indicator bacteria are presented and discussed (focusing on the advantages and limitations of their use as markers). Important sources of bacterial fecal pollution of environmental waters are also briefly indicated. In the last topic it is discussed which indicators of fecal pollution should be used in current drinking water microbiological analysis. It was concluded that safe drinking water for all is one of the major challenges of the 21st century and that microbiological control of drinking water should be the norm everywhere. Routine basic microbiological analysis of drinking water should be carried out by assaying the presence of Escherichia coli by culture methods. Whenever financial resources are available, fecal coliform determinations should be complemented with the quantification of enterococci. More studies are needed in order to check if ammonia is reliable for a preliminary screening for emergency fecal pollution outbreaks. Financial resources should be devoted to a better understanding of the ecology and behavior of human and animal fecal bacteria in environmental waters. PMID:21139855

  17. Mid-Columbia Coho Salmon Reintroduction Feasibility Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Washington Department of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation

    1999-01-01

    Before the Bonneville Power Administration (BPA) decides whether to fund a program to reintroduce coho salmon to mid-Columbia River basin tributaries, research is needed to determine the ecological risks and biological feasibility of such an effort. Since the early 1900s, the native stock of coho has been decimated in the tributaries of the middle reach of the Columbia River. The four Columbia River Treaty Tribes identified coho reintroduction in the mid-Columbia as a priority in the Tribal Restoration Plan. It is a comprehensive plan put forward by the Tribes to restore the Columbia River fisheries. In 1996, the Northwest Power Planning Council (NPPC) recommended the tribal mid-Columbia reintroduction project for funding by BPA. It was identified as one of fifteen high-priority supplementation projects for the Columbia River basin, and was incorporated into the NPPC`s Fish and Wildlife Program. The release of coho from lower Columbia hatcheries into mid-Columbia tributaries is also recognized in the Columbia River Fish Management Plan.

  18. Microbiologically active nanocomposite media

    NASA Astrophysics Data System (ADS)

    Petranovskii, Vitalii; Panina, Lyudmila; Bogomolova, Eugenia; Belostotskaya, Galina

    2003-07-01

    The most recent approach to the development of novel antimicrobial and antifungal agents is based on the application of synthetic and natural zeolites, because zeolites are known to be the carrier and slow releaser of the heavy metals with olygodynamic properties. The microbiological activity of the ion-exchanged zeolites is attributed to the ionic state of the metal sreleased from the zeolites by ion re-exchange. In the present work we used low cost natural clinoptilolite (Cli) as a substrate for copper and silver in different states. The state of oxidation of the exchanged metal in zeolite with supported Cu and Ag species (in the form of cations, small clusters, sub-coloidal particles, large particles) in order to fit them to fulfill the following criteria: to demonstrate their high protective abilities against fungi and long-term stability. The study of structure of samples with XRD, UV-visible spectroscopy, FTIR, their stability with temperature and during storage was carried out for obtaining the correct correlation with microbiological activity.

  19. Microbiology of chronic rhinosinusitis.

    PubMed

    Brook, I

    2016-07-01

    Most sinus infections are viral and only a small percentage develop bacterial infection. Rhino-, influenza, and para-influenza viruses are the most frequent viral causes of sinusitis. The most common bacterial isolates from children and adult patients with community-acquired acute bacterial sinusitis are Streptococcus pneumoniae, Haemophilus influenzae, Moraxella catarrhalis, and Streptococcus pyogenes. Staphylococcus aureus and anaerobic organisms (Prevotella and Porphyromonas, Fusobacterium, and Peptostreptococcus spp.) are the commonest isolates in chronic rhinosinusitis (CRS). Aerobic and anaerobic beta lactamase-producing bacteria (BLPB) were recovered from over a third of these patients. Methicillin-resistant S. aureus (MRSA) accounted for over 60 % of S. aureus isolates. Pseudomonas aeruginosa and other aerobic and facultative Gram-negative rods are frequently recovered in nosocomial sinusitis, the immunocompromised host, individuals with human immunodeficiency virus infection, and in cystic fibrosis. The CRS infection evolves the formation of a biofilm that might play a significant role in the pathogenesis and persistence of CRS. The microbiology of sinusitis is influenced by previous antimicrobial therapy, vaccinations, and the presence of normal flora capable of interfering with the growth of pathogens. Recognition of the unique microbiology of CRS and their antimicrobial susceptibility is of great importance when selecting antimicrobial therapy. PMID:27086363

  20. Environmental projects. Volume 12: Friable asbestos abatement, GDSCC

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Goldstone Deep Space Communications Complex (GDSCC) is part of the NASA Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Activities at the GDSCC are carried out in support of six large parabolic dish antennas. These activities may give rise to a variety of environmental hazards, particularly the danger of exposure of GDSCC personnel to asbestos fibers that have been shown to be responsible for such serious ailments as asbestosis, lung cancer, and mesothelioma. Asbestos-containing materials (ACM's) were used in the construction of many of the approximately 100 buildings and structures that were built at the GDSCC during a 30-year period from the 1950s through 1980s. The friable asbestos-abatement program at the GDSCC is presented which consists of text, illustrations, and tables that describe the friable asbestos abatement carried out at the GDSCC from December 21, 1988 through May 11, 1989.

  1. "Engendering" environmental projects: the case of eco-timber production in the Solomon Islands.

    PubMed

    Scheyvens, R

    1998-11-01

    This article discusses the case of timber production in the Solomon Islands and links between environmental protection and gender. Many environmental projects are undertaken without regard for gender roles and relations. The Solomon Western Islands Fair Trade (SWIFT) initiative included women in only a peripheral way. This article justifies the involvement of women in environmental projects and then evaluates the operations of SWIFT. A role for women in local environmental projects should be recognized because of women's roles, knowledge, and interests. Use of natural resources is gender-based. In the Solomon Islands, women are identified as having the greater interest in the long-term sustainability of the environment and greater reliance on natural resources to fulfill their roles, but forestry is men's work. The price of tropical woods has tempted Micronesian governments to exploit forests to enhance their foreign exchange earnings. Environmental degradation from logging is particularly severe in the Solomon Islands. The population fulfills many basic needs from forests. Forests can provide cash earnings. The author conducted an evaluation of effectiveness of SWIFT in 1996. The SWIFT project allows rural people to earn cash from sustainable timber extraction without signing with logging companies. Women are affected by SWIFT due to their husbands' appropriation of their earnings, their peripheral role, and lack of representation in senior positions and use of women's forestry expertise. The article offers a model for genderizing eco-projects. Men need to be encouraged to work more as partners with women. PMID:12321992

  2. Recent advances in silage microbiology

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Recent advances in our understanding of silage microbiology are reviewed. The ability to extract microbial DNA from silages, amplify portions of DNA, and use the amplified regions to identify strains of microorganisms is at the core of the changes occurring recently in silage microbiology. These dev...

  3. Environmental Compliance at the West Valley Demonstration Project: The Vitrification Permitting Program

    SciTech Connect

    L. C. Salvatori; C. B. Banzer; W. T. Watters

    1996-05-28

    The major environmental laws that apply to the West Valley Demonstration Project (WVDP) are the: Resource Conservation and Recovery Act (RCRA), Clean Air Act (CAA), Clean Water Act (CWA), Safe Drinking Water Act (SDWA), Toxic Substances Control Act (TSCA), National Environmental Policy Act (NEPA), and Emergency Planning and Community Right-To-Know Act (EPCRA). Regulations developed in accordance with these laws are administered by the New York State Department of Environmental Conservation (NYSDEC) and the U.S. Environmental Protection Agency (EPA) through state and federal programs, and regulatory requirements such as permitting. The Environmental Permits & Reports (EP&R) Group of the Environmental Affairs (EA) Department has the primary responsibility for developing a site-wide permitting program for the WVDP and obtaining the necessary permits. This report discusses the permits and the permitting process associated with the Vitrification Facility (VF).

  4. Impact of sampling depth and plant species on local environmental conditions, microbiological parameters and bacterial composition in a mercury contaminated salt marsh.

    PubMed

    Cleary, D F R; Oliveira, V; Gomes, N C M; Pereira, A; Henriques, I; Marques, B; Almeida, A; Cunha, A; Correia, A; Lillebø, A I

    2012-02-01

    We compare the environmental characteristics and bacterial communities associated with two rushes, Juncus maritimus and Bolboschoenus maritimus, and adjacent unvegetated habitat in a salt marsh subjected to historical mercury pollution. Mercury content was higher in vegetated than unvegetated habitat and increased with sampling depth. There was also a significant relationship between mercury concentration and bacterial composition. Habitat (Juncus, Bolboschoenus or unvegetated), sample depth, and the interaction between both, however, explained most of the variation in composition (~70%). Variation in composition with depth was most prominent for the unvegetated habitat, followed by Juncus, but more constrained for Bolboschoenus habitat. This constraint may be indicative of a strong plant-microbe ecophysiological adaptation. Vegetated habitat contained distinct bacterial communities associated with higher potential activity of aminopeptidase, β-glucosidase and arylsulphatase and incorporation rates of (14)C-glucose and (14)C-acetate. Communities in unvegetated habitat were, in contrast, associated with both higher pH and proportion of sulphate reducing bacteria. PMID:22177286

  5. Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-01-07

    The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project.

  6. Evolution across the Curriculum: Microbiology

    PubMed Central

    Burmeister, Alita R.; Smith, James J.

    2016-01-01

    An integrated understanding of microbiology and evolutionary biology is essential for students pursuing careers in microbiology and healthcare fields. In this Perspective, we discuss the usefulness of evolutionary concepts and an overall evolutionary framework for students enrolled in microbiology courses. Further, we propose a set of learning goals for students studying microbial evolution concepts. We then describe some barriers to microbial evolution teaching and learning and encourage the continued incorporation of evidence-based teaching practices into microbiology courses at all levels. Next, we review the current status of microbial evolution assessment tools and describe some education resources available for teaching microbial evolution. Successful microbial evolution education will require that evolution be taught across the undergraduate biology curriculum, with a continued focus on applications and applied careers, while aligning with national biology education reform initiatives. Journal of Microbiology & Biology Education PMID:27158306

  7. Evolution across the Curriculum: Microbiology.

    PubMed

    Burmeister, Alita R; Smith, James J

    2016-05-01

    An integrated understanding of microbiology and evolutionary biology is essential for students pursuing careers in microbiology and healthcare fields. In this Perspective, we discuss the usefulness of evolutionary concepts and an overall evolutionary framework for students enrolled in microbiology courses. Further, we propose a set of learning goals for students studying microbial evolution concepts. We then describe some barriers to microbial evolution teaching and learning and encourage the continued incorporation of evidence-based teaching practices into microbiology courses at all levels. Next, we review the current status of microbial evolution assessment tools and describe some education resources available for teaching microbial evolution. Successful microbial evolution education will require that evolution be taught across the undergraduate biology curriculum, with a continued focus on applications and applied careers, while aligning with national biology education reform initiatives. Journal of Microbiology & Biology Education. PMID:27158306

  8. Integrated Codes for Estimating Environmental Accumulation and Individual Dose from Past Hanford Atmospheric Releases: Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Ikenberry, T. A.; Burnett, R. A.; Napier, B. A.; Reitz, N. A.; Shipler, D. B.

    1992-02-01

    Preliminary radiation doses were estimated and reported during Phase I of the Hanford Environmental Dose Reconstruction (HEDR) Project. As the project has progressed, additional information regarding the magnitude and timing of past radioactive releases has been developed, and the general scope of the required calculations has been enhanced. The overall HEDR computational model for computing doses attributable to atmospheric releases from Hanford Site operations is called HEDRIC (Hanford Environmental Dose Reconstruction Integrated Codes). It consists of four interrelated models: source term, atmospheric transport, environmental accumulation, and individual dose. The source term and atmospheric transport models are documented elsewhere. This report describes the initial implementation of the design specifications for the environmental accumulation model and computer code, called DESCARTES (Dynamic EStimates of Concentrations and Accumulated Radionuclides in Terrestrial Environments), and the individual dose model and computer code, called CIDER (Calculation of Individual Doses from Environmental Radionuclides). The computations required of these models and the design specifications for their codes were documented in Napier et al. (1992). Revisions to the original specifications and the basis for modeling decisions are explained. This report is not the final code documentation but gives the status of the model and code development to date. Final code documentation is scheduled to be completed in FY 1994 following additional code upgrades and refinements. The user's guide included in this report describes the operation of the environmental accumulation and individual dose codes and associated pre- and post-processor programs. A programmer's guide describes the logical structure of the programs and their input and output files.

  9. Environmental management requirements/defensible costs project. Final report

    SciTech Connect

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  10. Initial Assessment of Environmental Barrier Coatings for the Prometheus Project

    SciTech Connect

    M. Frederick

    2005-12-15

    Depending upon final design and materials selections, a variety of engineering solutions may need to be considered to avoid chemical degradation of components in a notional space nuclear power plant (SNPP). Coatings are one engineered approach that was considered. A comprehensive review of protective coating technology for various space-reactor structural materials is presented, including refractory metal alloys [molybdenum (Mo), tungsten (W), rhenium (Re), tantalum (Ta), and niobium (Nb)], nickel (Ni)-base superalloys, and silicon carbide (Sic). A summary description of some common deposition techniques is included. A literature survey identified coatings based on silicides or iridium/rhenium as the primary methods for environmental protection of refractory metal alloys. Modified aluminide coatings have been identified for superalloys and multilayer ceramic coatings for protection of Sic. All reviewed research focused on protecting structural materials from extreme temperatures in highly oxidizing conditions. Thermodynamic analyses indicate that some of these coatings may not be protective in the high-temperature, impure-He environment expected in a Prometheus reactor system. Further research is proposed to determine extensibility of these coating materials to less-oxidizing or neutral environments.

  11. Environmental Test Program for the Mars Exploration Rover Project

    NASA Technical Reports Server (NTRS)

    Fisher, Terry C.; VanVelzer, Paul L.

    2004-01-01

    On June 10 and July 7, 2003 the National Aeronautics and Space Administration (NASA) launched two spacecraft from Cape Canaveral, Florida for a six (6) months flight to the Red Planet, Mars. The two Mars Exploration Rover spacecraft landed safely on the planet in January 2004. Prior to the successful launch, both of the spacecraft were involved in a comprehensive test campaign that included development, qualification, and protoflight test programs. Testing was performed to simulate the environments associated with launch, inter-planetary cruise, landing on the planet and Mars surface operations. Unique test requirements included operating the spacecraft while the chamber pressure was controlled to simulate the decent to the planet from deep space, high impact landing loads and rover operations on the surface of the planet at 8 Torr and -130 C. This paper will present an overview of the test program that included vibration, pyro-shock, landing loads, acoustic noise, thermal vacuum and solar simulation testing at the Jet Propulsion Laboratory (JPL) Environmental Test Laboratory facilities in Pasadena, California.

  12. Maine Environmental Priorities Project: Summary of the Reports from the Technical Working Groups to the Steering Committee.

    ERIC Educational Resources Information Center

    National Association for Environmental Education, Miami, FL.

    The Maine Environmental Priorities Project (MEPP) is a comparative risk project designed to identify, compare, and rank the most serious environmental problems facing Maine. Once the problems are analyzed and ranked according to their threat or risk to Maine's ecological health, human health, and quality of life, the project will propose…

  13. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    SciTech Connect

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  14. Conforth Ranch (Wanaket) Wildlife Mitigation Project : Draft Management Plan and Draft Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Confederated Tribes of the Umatilla Reservation, Oregon.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  15. The green choices project: integrating environmental health education into reproductive health care settings.

    PubMed

    Worthington, Sandra; Armstrong, Kay; Debevec, Elie

    2010-01-01

    A national reproductive health organization developed the Green Choices project to educate staff and clients about how to live in healthier environments by reducing potentially harmful environmental exposures to toxicants. An advisory group, comprised of experts in environmental and reproductive health and literacy, defined the project's scope and common environmental exposures to address. The following educational materials were developed: an online staff environmental health 101 curriculum, an environmental health assessment tool for clients to identify their potential risks, and information sheets for each environmental exposure that described potential risks and ways to reduce risks. Beta-testing methods included baseline and follow-up surveys, one-on-one interviews, focus groups, and recommendations from experts. Staff and client feedback on the educational materials resulted in increased clarity, sensitivity, relevancy, and appeal. Environmental health experts ensured accuracy of information, and reading experts lowered the reading level from 12th to 6th grade. A campaign to disseminate environmental health information and educational materials nationally is under way. PMID:20838173

  16. RESOLVE (Regolith & Environmental Science Oxygen & Lunar Volatile Extraction) Project

    NASA Technical Reports Server (NTRS)

    Parker, Ray; Coan, Mary; Captain, Janine; Cryderman, Kate; Quinn, Jacqueline

    2015-01-01

    The RESOLVE Project is a lunar prospecting mission whose primary goal is to characterize water and other volatiles in lunar regolith. The Lunar Advanced Volatiles Analysis (LAVA) subsystem is comprised of a fluid subsystem that transports flow to the gas chromatograph - mass spectrometer (GC-MS) instruments that characterize volatiles and the Water Droplet Demonstration (WDD) that will capture and display water condensation in the gas stream. The LAVA Engineering Test Unit (ETU) is undergoing risk reduction testing this summer and fall within a vacuum chamber to understand and characterize component and integrated system performance. Testing of line heaters, printed circuit heaters, pressure transducers, temperature sensors, regulators, and valves in atmospheric and vacuum environments was done. Test procedures were developed to guide experimental tests and test reports to analyze and draw conclusions from the data. In addition, knowledge and experience was gained with preparing a vacuum chamber with fluid and electrical connections. Further testing will include integrated testing of the fluid subsystem with the gas supply system, near-infrared spectrometer for the Surge Tank (NIRST), WDD, Sample Delivery System, and GC-MS in the vacuum chamber. Since LAVA is a scientific subsystem, the near infrared spectrometer and GC-MS instruments will be tested during the ETU testing phase.

  17. Using offsets to mitigate environmental impacts of major projects: A stakeholder analysis.

    PubMed

    Martin, Nigel; Evans, Megan; Rice, John; Lodhia, Sumit; Gibbons, Philip

    2016-09-01

    Global patterns of development suggest that as more projects are initiated, business will need to find acceptable measures to conserve biodiversity. The application of environmental offsets allows firms to combine their economic interests with the environment and society. This article presents the results of a multi-stakeholder analysis related to the design of offsets principles, policies, and regulatory processes, using a large infrastructure projects context. The results indicate that business was primarily interested in using direct offsets and other compensatory measures, known internationally as indirect offsets, to acquit their environmental management obligations. In contrast, the environmental sector argued that highly principled and scientifically robust offsets programs should be implemented and maintained for enduring environmental protection. Stakeholder consensus stressed the importance of offsets registers with commensurate monitoring and enforcement. Our findings provide instructive insights into the countervailing views of offsets policy stakeholders. PMID:27173891

  18. Treatment bed microbiological control

    NASA Technical Reports Server (NTRS)

    Janauer, Gilbert E.; Fitzpatrick, Timothy W.; Kril, Michael B.; Wilber, Georgia A.; Sauer, Richard L.

    1987-01-01

    The effects of microbial fouling on treatment bed (TB) performance are being studied. Fouling of activated carbon (AC) and ion exchange resins (IEX) by live and devitalized bacteria can cause decreased capacity for selected sorbates with AC and IEX TB. More data are needed on organic species removal in the trace region of solute sorption isotherms. TB colonization was prevented by nonclassical chemical disinfectant compositions (quaternary ammonium resins) applied in suitable configurations. Recently, the protection of carbon beds via direct disinfectant impregnation has shown promise. Effects (of impregnation) upon bed sorption/removal characteristics are to be studied with representative contaminants. The potential need to remove solutes added or produced during water disinfection and/or TB microbiological control must be investigated.

  19. Microbiology of sinusitis.

    PubMed

    Brook, Itzhak

    2011-03-01

    Most sinus infections are viral, and only a small proportion develops a secondary bacterial infection. Rhinoviruses, influenza viruses, and parainfluenza viruses are the most common causes of sinusitis. The most common bacteria isolated from pediatric and adult patients with community-acquired acute purulent sinusitis are Streptococcus pneumoniae, Haemophilus influenzae, Moraxella catarrhalis, and Streptococcus pyogenes. Staphylococcus aureus and anaerobic bacteria (Prevotella and Porphyromonas, Fusobacterium and Peptostreptococcus spp.) are the main isolates in chronic sinusitis. Pseudomonas aeruginosa and other aerobic and facultative gram-negative rods are commonly isolated from patients with nosocomial sinusitis, the immunocompromised host, those with HIV infection, and in cystic fibrosis. Fungi and Pseudomonas aeruginosa are the most common isolates in neutropenic patients. The microbiology of sinusitis is influenced by the previous antimicrobial therapy, vaccinations, and the presence of normal flora capable of interfering with the growth of pathogens. PMID:21364226

  20. DOE/EA-1493: Environmental Assessment for Greenidge Multi-Pollutant Control Project (August 2004)

    SciTech Connect

    N /A

    2004-08-10

    DOE has prepared an Environmental Assessment (EA), DOE/EA-1493, titled ''Greenidge Multi-Pollutant Control Project'', to analyze the potential environmental consequences of providing cost-shared funding support for the design, construction, and demonstration of an integrated multipollutant control system at AES's Greenidge Station in Dresden, New York. The system, expected to control emissions of NO{sub x}, SO{sub 2}, SO{sub 3}, HF, HCl, and Hg, would be installed on the existing, coal-fired, 107-MW Unit 4 at Greenidge. The results of the analyses provided in the EA are summarized in this Finding of No Significant Impact. The proposed action is for DOE to provide about $14.5 million for this project, while CONSOL Energy Inc. and its project partners would be responsible for the remaining $21 million. The proposed project will result in technical, environmental, and financial data from the design, operation and construction of the multi-pollutant control system. This 4.5-year, commercial-scale demonstration project would allow utilities, particularly those with units less than 300-MW in capacity, to make decisions regarding the integrated multi-pollutant control system as a viable commercial option. Based on the analyses in the EA, DOE has concluded that the Greenidge Multi-Pollutant Control Project would result in minimal and insignificant consequences to the human environment. Thus, DOE considers that the proposed action, providing cost-shared funding for the project, is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 United States Code 4321, et seq. Therefore, in accordance with 10 CFR Part 1021.322, DOE has concluded that preparation of an Environmental Impact Statement is not required, and DOE is issuing this FONSI.

  1. Applicability of the "Frame of Reference" approach for environmental monitoring of offshore renewable energy projects.

    PubMed

    Garel, Erwan; Rey, Cibran Camba; Ferreira, Oscar; van Koningsveld, Mark

    2014-08-01

    This paper assesses the applicability of the Frame of Reference (FoR) approach for the environmental monitoring of large-scale offshore Marine Renewable Energy (MRE) projects. The focus is on projects harvesting energy from winds, waves and currents. Environmental concerns induced by MRE projects are reported based on a classification scheme identifying stressors, receptors, effects and impacts. Although the potential effects of stressors on most receptors are identified, there are large knowledge gaps regarding the corresponding (positive and negative) impacts. In that context, the development of offshore MRE requires the implementation of fit-for-purpose monitoring activities aimed at environmental protection and knowledge development. Taking European legislation as an example, it is suggested to adopt standardized monitoring protocols for the enhanced usage and utility of environmental indicators. Towards this objective, the use of the FoR approach is advocated since it provides guidance for the definition and use of coherent set of environmental state indicators. After a description of this framework, various examples of applications are provided considering a virtual MRE project located in European waters. Finally, some conclusions and recommendations are provided for the successful implementation of the FoR approach and for future studies. PMID:24768831

  2. Establishing an EnvironMentors Project to Guide Minority Students into Science, Technology, and Environmental Careers

    SciTech Connect

    Montague, W. E.

    2003-01-24

    This report of the EnvironMentors Project (TEP) for the period February 1994 through December 1998, provides a summary of activities at our program sites and of our overall organizational accomplishments. Notably, the EnvironMentors Project matched 506 teens from under-resourced neighborhoods in Washington (DC), Trenton (NJ), and Baltimore (MD) with mentors, engaged more than 1,600 members of the public in informative discussions of environmental research, and presented interactive environmental education lessons to approximately 5,700 elementary and middle school children.

  3. Microbiology of aggressive periodontitis.

    PubMed

    Könönen, Eija; Müller, Hans-Peter

    2014-06-01

    For decades, Aggregatibacter actinomycetemcomitans has been considered the most likely etiologic agent in aggressive periodontitis. Implementation of DNA-based microbiologic methodologies has considerably improved our understanding of the composition of subgingival biofilms, and advanced open-ended molecular techniques even allow for genome mapping of the whole bacterial spectrum in a sample and characterization of both the cultivable and not-yet-cultivable microbiota associated with periodontal health and disease. Currently, A. actinomycetemcomitans is regarded as a minor component of the resident oral microbiota and as an opportunistic pathogen in some individuals. Its specific JP2 clone, however, shows properties of a true exogenous pathogen and has an important role in the development of aggressive periodontitis in certain populations. Still, limited data exist on the impact of other microbes specifically in aggressive periodontitis. Despite a wide heterogeneity of bacteria, especially in subgingival samples collected from patients, bacteria of the red complex in particular, and those of the orange complex, are considered as potential pathogens in generalized aggressive periodontitis. These types of bacterial findings closely resemble those found for chronic periodontitis, representing a mixed polymicrobial infection without a clear association with any specific microorganism. In aggressive periodontitis, the role of novel and not-yet-cultivable bacteria has not yet been elucidated. There are geographic and ethnic differences in the carriage of periodontitis-associated microorganisms, and they need to be taken into account when comparing study reports on periodontal microbiology in different study populations. In the present review, we provide an overview on the colonization of potential periodontal pathogens in childhood and adolescence, and on specific microorganisms that have been suspected for their role in the initiation and progression of aggressive

  4. GENII: The Hanford Environmental Radiation Dosimetry Software System: Volume 2, Users' manual: Hanford Environmental Dosimetry Upgrade Project

    SciTech Connect

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-11-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). The purpose of this coupled system of computer codes is to analyze environmental contamination of, air, water, or soil. This is accomplished by calculating radiation doses to individuals or populations. GENII is described in three volumes of documentation. This second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. The first volume describes the theoretical considerations of the system. The third volume is a Code Maintenance Manual for the user who requires knowledge of code detail. It includes logic diagrams, global dictionary, worksheets, example hand calculations, and listings of the code and its associated data libraries. 27 refs., 17 figs., 23 tabs.

  5. GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project

    SciTech Connect

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-09-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

  6. The city of San Diego Environmental Service Department`s Ridgehaven green building demonstration project: Project case study. Final report

    SciTech Connect

    Gottfried, D.A.; Schoichet, E.A.

    1998-05-01

    This case study describes the greening of Ridgehaven, the City of San Diego Environmental Services Department`s (ESD`s) new 73,000 sf{sup 2} headquarters building. The use of green design techniques within the conventional renovation of the existing structure significantly increased energy efficiency and indoor air quality (IAQ), and decreased the project`s environmental impact. Despite the constraining municipal budget, tight time schedule, and mandated public bidding procedures, the design team made energy efficiency, IAQ, and resource efficiency their primary design determinants. In the design phase the team screened materials and systems for environmental impact, and their effect on IAQ. Existing materials and systems were frequently reused, thus salvaging or recycling many items that might have gone to landfill. The design team also addressed the environmental impacts of construction and building operations. The ``Green Building Demonstration Program`` included educational outreach and the creation of a unique Manufacturer`s Partnership Program to highlight the effectiveness of green building products and systems. The evaluation featured computerized energy modeling and life-cycle based financial analysis to optimize the energy system design. The annual average energy consumption is designed to be close to 50% of the energy consumption for a comparable California Title 24 energy code compliant building, thus making it one of the most energy efficient buildings in San Diego.

  7. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  8. New Waddell-Westwing 230-kV transmission project, Maricopa County, Arizona: Environmental assessment

    SciTech Connect

    Not Available

    1988-10-01

    The Western Area Power Administration (Western) proposes to construct a new 230 kilovolt (kV) transmission line in Maricopa County, Arizona, that would extend from the New Waddell Dam on the Agua Fria River, to the Westwing Substation, about 10.5 miles southwest of the dam. The project area is roughly 45 miles northwest of the Phoenix metropolitan area. Western will complete the National Environmental Policy Act of 1969 (NEPA) process for the line. A final environmental impact statement (EIS) was prepared by BuRec to describe the environmental impacts associated with alternatives for the construction and operation of the Regulatory Storage Division of the Central Arizona Project (CAP). The EIS was supported by 23 technical reports that covered planning, design, public involvement, social and environmental impact assessment, economics, and hydrological analysis. Since the proposed transmission system differs only slightly from that described in the EIS, Western incorporates by reference the EIS and its 23 supporting technical reports into this environmental assessment (EA). In August 1985, BuRec completed an EA on modifications to the New Waddell Dam Project design plans and issued a FONSI on these modifications; the EA did not cover the transmission line. The purpose of this EA is to document the potential environmental effects of the proposed construction of the transmission line and switchyards in order to determine if an EIS is needed or if a finding of no significant impact (FONSI) is indicated. 28 refs., 5 figs., 1 tab.

  9. Environmental Education Project for Developing Supersphere Characters in Children's Books

    NASA Astrophysics Data System (ADS)

    Vasconcelos, G. F.

    2014-12-01

    To raise awareness and provide basic knowledge about the environment, three children's books have been created to explain, in a simplified language, the basic processes of formation of the Earth, the origin of the universe, the planets and the moon, volcanism, rock formation and the appearance of water, the earliest life forms and their evolution and the main elements of Earth. These phenomena are represented through the main characters who are super heroes or designated Superspheres, such as Hydrosphere (water), Lithosphere (rocks), Biosphere (Polite, a stromatolite and Sarite, the mineral dolomite), Atmosphere (air), which are the 4 components of the Earth System, and the Pyrosphere(fire), which supplies the energy to drive the Earth System through volcanic activity. The characters have each developed super powers that evolved over geological time as they are transformed. They are the basic elements of nature and appear in a specific chronological order. With the emergence of ancient life in the seas, the Biosphere begins to use the energy of the sun, through of the photosynthetic activity of stromatolites, one of the friends of the superheroes, to produce the oxygen for the Atmosphere. Over a vast period of time, the evolution of life continues with the formation of the supercontinent Gondwana. With the arrival of man and his interaction with the Earth, the villain appears in the book as the "Homo incorrectus" (incorrect man), who abuses and tries to destroy the super heroes, the "Superspheres". The importance of these characters for the living Earth is emphasized, creating a connection between children and the characters. The aim of the story is to create a greater ecological conscience in the children and showing them that they should be helping to save the "Superspheres", who are in danger and need to be preserved. Projects for primary schools in the State of Rio de Janeiro have been designed and implemented around these characters, focusing on the rescue of

  10. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1992-12-31

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

  11. Environmental projects. Volume 6: Environmental assessment. New 34-meter antenna at Venus site

    NASA Technical Reports Server (NTRS)

    Kushner, L.

    1988-01-01

    The Jet Propulsion Lab has proposed replacing the 26-meter antenna at the Venus Station of the Goldstone Deep Space Communications Complex with a new 34-meter antenna. An environmental impact assessment of this proposed change is presented. It is concluded that the proposed antenna and its operation would not result in significant adverse impacts to the physical or human environment. It will, however, be necessary to manage electromagnetic transmissions from the antenna in such a manner as to ensure safe operation.

  12. Lessons Learned from the Development and Implementation of the Atmosphere Resource Recovery and Environmental Monitoring Project

    NASA Technical Reports Server (NTRS)

    Roman, Monsi C.; Perry, Jay L.; Howard, David F.

    2014-01-01

    The Advanced Exploration Systems (AES) Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) Project have been developing atmosphere revitalization and environmental monitoring subsystem architectures suitable for enabling sustained crewed exploration missions beyond low Earth orbit (LEO). Using the International Space Station state-of-the-art (SOA) as the technical basis, the ARREM Project has contributed to technical advances that improve affordability, reliability, and functional efficiency while reducing dependence on a ground-based logistics resupply model. Functional demonstrations have merged new process technologies and concepts with existing ISS developmental hardware and operate them in a controlled environment simulating various crew metabolic loads. The ARREM Project's strengths include access to a full complement of existing developmental hardware that perform all the core atmosphere revitalization functions, unique testing facilities to evaluate subsystem performance, and a coordinated partnering effort among six NASA field centers and industry partners to provide the innovative expertise necessary to succeed. A project overview is provided and the project management strategies that have enabled a multidiscipinary engineering team to work efficiently across project, NASA field center, and industry boundaries to achieve the project's technical goals are discussed. Lessons learned and best practices relating to the project are presented and discussed.

  13. Overview of vegetation monitoring data, 1952--1983. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Duncan, J.P.

    1994-03-01

    This report is a result of the Hanford Environmental Dose Reconstruction (HEDR) Project. The goal of the HEDR Project is to estimate the radiation dose that individuals could have received from emissions since 1944 at the Hanford Site near Richland, Washington. Members of the HEDR Project`s Environmental Monitoring Data Task have developed databases of historical environmental measurements of such emissions. The HEDR Project is conducted by Battelle, Pacific Northwest Laboratories. This report is the third in a series that documents the information available on measurements of iodine-131 concentrations in vegetation. The first two reports provide the data for 1945--1951. This report provides an overview of the historical documents, which contain vegetation data for 1952--1983. The overview is organized according to the documents available for any given year. Each section, covering one year, contains a discussion of the media sampled, the sampling locations, significant events if there were any, emission quantities, constituents measured, and a list of the documents with complete reference information. Because the emissions which affected vegetation were significantly less after 1951, the vegetation monitoring data after that date have not been used in the HEDR Project. However, access to these data may be of interest to the public. This overview is, therefore, being published.

  14. Sulimar Queen environmental restoration project closure package Sandia environmental stewardship exemplar.

    SciTech Connect

    Tillman, Jack B.

    2008-09-01

    In March 2008, Sandia National Laboratories (Sandia), in partnership with the Bureau of Land Management, Roswell Field Office, completed its responsibilities to plug and abandon wells and restore the surface conditions for the Sulimar Queens Unit, a 2,500 acre oil field, in Chaves County, Southeast New Mexico. Sandia assumed this liability in an agreement to obtain property to create a field laboratory to perform extensive testing and experimentation on enhanced oil recovery techniques for shallow oil fields. In addition to plugging and abandoning 28 wells, the project included the removal of surface structures and surface reclamation of disturbed lands associated with all plugged and abandoned wells, access roads, and other auxiliary facilities within unit boundaries. A contracting strategy was implemented to mitigate risk and reduce cost. As the unit is an important wildlife habitat for prairie chickens, sand dune lizards, and mule deer, the criteria for the restoration and construction process were designed to protect and enhance the wildlife habitat. Lessons learned from this project include: (1) extreme caution should be exercised when entering agreements that include future liabilities, (2) partnering with the regulator has huge benefits, and (3) working with industry experts, who were familiar with the work, and subcontractors, who provided the network to complete the project cost effectively.

  15. Meta-analysis in microbiology.

    PubMed

    Pabalan, N; Jarjanazi, H; Steiner, T S

    2014-01-01

    The use of meta-analysis in microbiology may facilitate decision-making that impacts public health policy. Directed at clinicians and researchers in microbiology, this review outlines the steps in performing this statistical technique, addresses its biases and describes its value in this discipline. The survey to estimate extent of the use of meta-analyses in microbiology shows the remarkable growth in the use of this research methodology, from a minimal Asian output to a level comparable with those of Europe and North America in the last 7 years. PMID:25008812

  16. FY 1992 revised task plans for the Hanford Environmental Dose Reconstruction Project. Revision 1

    SciTech Connect

    Shipler, D.B.

    1992-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objectives of work to be performed in FY 1992 is to determine the appropriate scope (space, time, and radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Another objective is to use a refined computer model to estimate Native American tribal doses and individual doses for the Hanford Thyroid Disease Study (HTDS). Project scope and accuracy requirements defined in FY 1992 can translated into model and data requirements that must be satisfied during FY 1993.

  17. FY 1992 revised task plans for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objectives of work to be performed in FY 1992 is to determine the appropriate scope (space, time, and radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Another objective is to use a refined computer model to estimate Native American tribal doses and individual doses for the Hanford Thyroid Disease Study (HTDS). Project scope and accuracy requirements defined in FY 1992 can translated into model and data requirements that must be satisfied during FY 1993.

  18. Collaborative Projects Increase Student Learning Outcome Performance in Nonmajors Environmental Science Course

    ERIC Educational Resources Information Center

    Chace, Jameson F.

    2014-01-01

    Between 2007 and 2010, three types of semester research projects were assigned in BIO 140 Humans and Their Environment, a nonmajors introductory course at Salve Regina University. Specific environmental impact-type assessments were used to foster scientific inquiry and achieve higher scientific literacy. Quantitative and qualitative measurements…

  19. A Collaborative Long-Term Project: Early Childhood Education, Environmental Education, and Landscape Architecture.

    ERIC Educational Resources Information Center

    Luera, Gail R.; Hong, Seong B.

    2003-01-01

    Describes how the common guiding principles of environment, representation, and collaboration in the disciplines of environmental education, early childhood education, and landscape architecture provided the foundation for a school-based garden project. Shows how the gardening activities and integration of the three philosophies helped to enhance…

  20. ECP (Environmental Conservation Project) Report, No. 5, March 1976. Planning for Energy Conservation.

    ERIC Educational Resources Information Center

    Environmental Law Inst., Washington, DC.

    The culmination of the Environmental Law Institute's Energy Conservation Project will be a series of handbooks addressed to state and local officials, legislators, and interested citizens setting out suggested strategies for conserving energy. This issue of the ECP Report publishes the first of a series of draft chapters from these handbooks - a…

  1. 78 FR 65420 - Environmental Impact Statement, Portageville Bridge Project (Wyoming and Livingston Counties, New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... Federal Highway Administration Environmental Impact Statement, Portageville Bridge Project (Wyoming and... provide a modern rail crossing at the location of the existing Portageville Bridge (also known as the ``Portage High Bridge'') over the Genesee River in Wyoming and Livingston Counties, New York. FOR...

  2. A Service-Learning Project in Chemistry: Environmental Monitoring of a Nature Preserve

    ERIC Educational Resources Information Center

    Kammler, David C.; Truong, Triet M.; VanNess, Garrett; McGowin, Audrey E.

    2012-01-01

    A collaborative environmental service-learning project was implemented between upper-level undergraduate science majors and graduate chemistry students at a large state school and first-year students at a small private liberal arts college. Students analyzed the water quality in a nature preserve by determining the quantities of 12 trace metals,…

  3. Environmentally Sound Small-Scale Agricultural Projects: Guidelines for Planning. Revised Edition.

    ERIC Educational Resources Information Center

    Altieri, Miguel; Vukasin, Helen L., Ed.

    Environmental planning requires more than finding the right technology and a source of funds. Planning involves consideration of the social, cultural, economic, and natural environments in which the project occurs. The challenge is to develop sustainable food systems that have reasonable production but do not degrade the resource base and upset…

  4. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false What is the typical IHS environmental review process for construction projects? 137.294 Section 137.294 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Nepa Process...

  5. Environmental Education. Nevada Competency-Based Adult High School Diploma Project.

    ERIC Educational Resources Information Center

    Nevada Univ., Las Vegas. Coll. of Education.

    This document is one of ten curriculum guides developed by the Nevada Competency-Based Adult High School Diploma (CBAHSD) Project. This curriculum guide on environmental education is divided into seven topics. The topics included are Human Carrying Capacity (The Ability to Foresee and Forestall), Human Population Growth, The Atmosphere, The…

  6. 78 FR 25258 - Notice of Availability (NOA) for Sharpe Permit Relinquishment Project Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... Assessment AGENCY: Defense Logistics Agency, DoD. ACTION: Notice of Availability (NOA) for Sharpe Permit Relinquishment Project Environmental Assessment. SUMMARY: The Defense Logistics Agency (DLA) announces the... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF DEFENSE...

  7. 75 FR 29359 - Draft Environmental Impact Statement for the Tamiami Trail Modifications: Next Steps Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... within the Park and the ecological connectivity between the Park and the Water Conservation Areas'' (2009... (Conservation Planning, Environmental Impact Analysis, and Decision- making), the NPS announces the availability... Water Deliveries to Everglades National Park Project (16 U.S.C. 410r-8), including a continuous...

  8. Radionuclide releases to the atmosphere from Hanford Operations, 1944--1972. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Heeb, C.M.

    1994-05-01

    The purpose of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation dose that individuals could have received as a result of radionuclide emissions since 1944 from the Hanford Site. The first step in determining dose is to estimate the amount and timing of radionuclide releases to air and water. This report provides the air release information.

  9. Leaders of Sustainable Development Projects: Resources Used and Lessons Learned in a Context of Environmental Education?

    ERIC Educational Resources Information Center

    Pruneau, Diane; Lang, Mathieu; Kerry, Jackie; Fortin, Guillaume; Langis, Joanne; Liboiron, Linda

    2014-01-01

    In our day, leaders involved in ingenious sustainable development projects plan spaces and implement practices that are beneficial to the environment. These initiatives represent a fertile source of information on the competences linked to environmental design that we should nurture in our students. In view of improving our understanding of the…

  10. 76 FR 16391 - Call for Innovative National Environmental Policy Act (NEPA) Pilot Project Proposals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ..., or excessively burdensome. 76 FR 3821, Jan. 21, 2011; 40 CFR 1500-1508. DATES: The Call for... NEPA Regulations that may be outmoded, ineffective, insufficient, or excessively burdensome. 76 FR 3821... QUALITY Call for Innovative National Environmental Policy Act (NEPA) Pilot Project Proposals...

  11. 75 FR 352 - Enloe Hydroelectric Project; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions December 28... application has been accepted and is now ready for environmental analysis. l. The Enloe Project would consist... (narrow channel of the Similkameen River) with a storage capacity of 775 acre-feet at 1,049.3 feet...

  12. 77 FR 67662 - Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ..., 2011, the BLM published a Notice of Intent (NOI) to prepare an EIS in the Federal Register (76 FR 57073... Bureau of Land Management Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement, Riverside County, CA and the Proposed California Desert Conservation Area...

  13. Environmental Scanning Project: A Dimensional Aspect of Needs Assessment in the Strategic Planning Process, Fall 1987.

    ERIC Educational Resources Information Center

    Lomax, Lynn A.

    The environmental scanning project described in this report was undertaken at Lane Community College (LCC) in Eugene, Oregon, to enhance the college's strategic planning process by anticipating events that might differ from the economic, social, and political conditions of the present. First, an overview is provided of the purpose and intent of…

  14. 78 FR 13748 - Environmental Impact Statement for the East San Fernando Valley Transit Corridor Project, Los...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ...The Federal Transit Administration (FTA) and the Los Angeles County Metropolitan Transportation Authority (LACMTA) are issuing this Notice of Intent (NOI) to advise other agencies and the public that they will jointly prepare an Environmental Impact Statement (EIS) for proposed transit improvements in the East San Fernando Valley Transit Project Corridor in Los Angeles County, California. The......

  15. Inventory of current environmental monitoring projects in the US-Canadian transboundary region

    SciTech Connect

    Glantz, C.S.; Ballinger, M.Y.; Chapman, E.G.

    1986-05-01

    This document presents the results of a study commissioned to survey and summarize major environmental monitoring projects in the US-Canadian transboundary region. Projects with field sites located within 400 km (250 mi) of the border and active after 1980 were reviewed. The types of projects included: ambient air-quality monitoring, ambient water-quality monitoring, deposition monitoring, forest/vegetation monitoring and research, soil studies, and ecosystem studies. Ecosystem studies included projects involving the measurement of parameters from more than one monitoring category (e.g., studies that measured both water and soil chemistry). Individual descriptions were formulated for 184 projects meeting the spatial and temporal criteria. Descriptions included the official title for the project, its common abbreviation, program emphasis, monitoring site locations, time period conducted, parameters measured, protocols employed, frequency of sample collection, data storage information, and the principal contact for the project. A summary inventory subdivided according to the six monitoring categories was prepared using a computerized data management system. Information on major centralized data bases in the field of environmental monitoring was also obtained, and summary descriptions were prepared. The inventory and data base descriptions are presented in appendices to this document.

  16. Interdisciplinary Project-Based Learning through an Environmental Water Quality Study

    NASA Astrophysics Data System (ADS)

    Juhl, Lorie; Yearsley, Kaye; Silva, Andrew J.

    1997-12-01

    An interdisciplinary environmental water quality study was designed and conducted to enhance training and employability of chemical and environmental technician students in associate degree programs. Four project objectives were identified as a means to enhance the educational experience and employability of our students: provide experience on analytical instrumentation for organic compounds (gas chromatography/mass spectrometry, GC/MS), require interdisciplinary group interactions and problem solving, provide experience with Environmental Protection Agency (EPA) procedures, and require cooperation with state agencies/private organizations. Students worked in groups that included representatives from both programs to develop project objectives and a Sampling and Analysis Plan (SAP) following EPA standards. Input from personnel at Idaho's Department of Environmental Quality and Bureau of Laboratories and from volunteers in an environmental "watch dog" organization called the Henry's Fork Foundation aided students in the development and implementation of their SAP. Subsequently, groups sampled sections of the Henry's Fork River and analyzed for organic, inorganic, and fecal contaminants. Analysis included EPA method 525.2 for pesticides using GC/MS. Data from all river segments was shared and each group submitted a final report analyzing results. Surveys completed by students and instructors indicate that the project is a successful teaching method allowing introduction of new skills as well as review of important technical and employability skills.

  17. Environmental change and water-related, vector borne diseases in eastern Africa: the HEALTHY FUTURES project

    NASA Astrophysics Data System (ADS)

    Taylor, David; Kienberger, Stefan; Tompkins, Adrian

    2015-04-01

    Pathogens that spend time outside the human body, and any organisms involved in their transmission, have particular ecological requirements; as environment, including climate, conditions change, then the transmission characteristics of associated pathogens - and the diseases caused - are also likely to vary. Relationships between environment and health in many parts of the world remain poorly studied and are often overlooked, however. This is particularly the case in developing countries, because of budgetary and available expertise constraints. Moreover the relationship is often confounded by other factors. These other factors contribute to human vulnerability, and thus to the overall disease risk due to environmental change. This presentation will highlight the importance of environmental, including climate, change information to a better understanding of the risks to health of projected future environmental changes, and to the more efficient and effective use of scarce health resources in the developing world. The paper will focus on eastern Africa, and in particular the health effects of future projected environmental change impacts on water-related, vector borne diseases in the East African Community region. Moreover the paper will highlight how the EU FP7-funded project HEALTHY FUTURES is, through a broadly-based, integrative approach that distinguishes environmental change-induced health hazard from health risk aims to support the health decisions making process, thereby attempting to help mitigate negative health impacts.

  18. Supplement analysis 2 of environmental impacts resulting from modifications in the West Valley Demonstration Project

    SciTech Connect

    1998-06-23

    The West Valley Demonstration Project, located in western New York, has approximately 600,000 gallons of liquid high-level radioactive waste (HLW) in storage in underground tanks. While corrosion analysis has revealed that only limited tank degradation has taken place, the failure of these tanks could release HLW to the environment. Congress requires DOE to demonstrate the technology for removal and solidification of HLW. DOE issued the Final Environmental Impact Statement (FEIS) in 1982. The purpose of this second supplement analysis is to re-assess the 1982 Final Environmental Impact Statement's continued adequacy. This report provides the necessary and appropriate data for DOE to determine whether the environmental impacts presented by the ongoing refinements in the design, process, and operations of the Project are considered sufficiently bounded within the envelope of impacts presented in the FEIS and supporting documentation.

  19. Environmental projects. Volume 15: Environmental assessment: Proposed 1-megawatt radar transmitter at the Mars site

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The Goldstone Deep Space Communications Complex (GDSCC), located in the Mojave Desert about 64.5 km (40 mi) north of Barstow, California. and about 258 km (160 mi) northeast of Pasadena, California, is part of the National Aeronautics and Space Administration's (NASA's) Deep Space Network (DSN), one of the world's larger and more sensitive scientific telecommunications and radio navigation networks. The Goldstone Complex is managed, technically directed, and operated for NASA by the Jet Propulsion Laboratory (JPL) of the California Institute of Technology in Pasadena, California. Activities at the GDSCC support the operation of six parabolic dish antennas located at five separate sites called Deep Space Stations (DSS's). Four sites, named Echo, Mars, Uranus, and Apollo, are operational for space missions, while the remaining Venus Site is devoted to research and development activities. The Mars Site at the GDSCC contains two antennas: the Uranus antenna (DSS 15, 34 m) and the Mars antenna (DSS 14, 70 m). This present volume deals solely with the DSS-14 Mars antenna. The Mars antenna not only can act as a sensitive receiver to detect signals from spacecraft, but it also can be used in radar astronomy as a powerful transmitter to send out signals to probe the solar system. At present, the Mars antenna operates as a continuous-wave microwave system at a frequency of 8.51 GHz at a power level of 0.5 MW. JPL has plans to upgrade the Mars antenna to a power level of 1 MW. Because of the anticipated increase in the ambient levels of radio frequency radiation (RFR), JPL retained Battelle Pacific Northwest Laboratories (BPNL), Richland, Washington, to conduct an environmental assessment with respect to this increased RFR. This present volume is a JPL-expanded version of the BPNL report titled Environmental Assessment of the Goldstone Solar System Radar, which was submitted to JPL in Nov. 1991. This BPNL report concluded that the operation of the upgraded Mars antenna at the

  20. Environmental projects. Volume 15: Environmental assessment: Proposed 1-megawatt radar transmitter at the Mars site

    NASA Astrophysics Data System (ADS)

    1992-10-01

    The Goldstone Deep Space Communications Complex (GDSCC), located in the Mojave Desert about 64.5 km (40 mi) north of Barstow, California. and about 258 km (160 mi) northeast of Pasadena, California, is part of the National Aeronautics and Space Administration's (NASA's) Deep Space Network (DSN), one of the world's larger and more sensitive scientific telecommunications and radio navigation networks. The Goldstone Complex is managed, technically directed, and operated for NASA by the Jet Propulsion Laboratory (JPL) of the California Institute of Technology in Pasadena, California. Activities at the GDSCC support the operation of six parabolic dish antennas located at five separate sites called Deep Space Stations (DSS's). Four sites, named Echo, Mars, Uranus, and Apollo, are operational for space missions, while the remaining Venus Site is devoted to research and development activities. The Mars Site at the GDSCC contains two antennas: the Uranus antenna (DSS 15, 34 m) and the Mars antenna (DSS 14, 70 m). This present volume deals solely with the DSS-14 Mars antenna. The Mars antenna not only can act as a sensitive receiver to detect signals from spacecraft, but it also can be used in radar astronomy as a powerful transmitter to send out signals to probe the solar system. At present, the Mars antenna operates as a continuous-wave microwave system at a frequency of 8.51 GHz at a power level of 0.5 MW. JPL has plans to upgrade the Mars antenna to a power level of 1 MW. Because of the anticipated increase in the ambient levels of radio frequency radiation (RFR), JPL retained Battelle Pacific Northwest Laboratories (BPNL), Richland, Washington, to conduct an environmental assessment with respect to this increased RFR. This present volume is a JPL-expanded version of the BPNL report titled Environmental Assessment of the Goldstone Solar System Radar, which was submitted to JPL in Nov. 1991. This BPNL report concluded that the operation of the upgraded Mars antenna at the

  1. MICROBIOLOGY: METHODOLOGY AND QUALITY ASSURANCE

    EPA Science Inventory

    Research on the microbiological quality of water continues to concentrate on improved methods for the detection, enumeration, and identification of pollution indicators, pathogens, and other microbial groups. A complete handbook of basic laboratory procedures, replete with resour...

  2. Sandia National Laboratories, California Quality Assurance Project Plan for Environmental Monitoring Program.

    SciTech Connect

    Holland, Robert C.

    2005-09-01

    This Quality Assurance Project Plan (QAPP) applies to the Environmental Monitoring Program at the Sandia National Laboratories/California. This QAPP follows DOE Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance (DOE G 414.1-2A June 17, 2005). The Environmental Monitoring Program is located within the Environmental Operations Department. The Environmental Operations Department is responsible for ensuring that SNL/CA operations have minimal impact on the environment. The Department provides guidance to line organizations to help them comply with applicable environmental regulations and DOE orders. To fulfill its mission, the department has groups responsible for waste management; pollution prevention, air quality; environmental planning; hazardous materials management; and environmental monitoring. The Environmental Monitoring Program is responsible for ensuring that SNL/CA complies with all Federal, State, and local regulations and with DOE orders regarding the quality of wastewater and stormwater discharges. The Program monitors these discharges both visually and through effluent sampling. The Program ensures that activities at the SNL/CA site do not negatively impact the quality of surface waters in the vicinity, or those of the San Francisco Bay. The Program verifies that wastewater and stormwater discharges are in compliance with established standards and requirements. The Program is also responsible for compliance with groundwater monitoring, and underground and above ground storage tanks regulatory compliance. The Program prepares numerous reports, plans, permit applications, and other documents that demonstrate compliance.

  3. West Valley Demonstration Project site environmental report for calendar year 1996

    SciTech Connect

    1997-06-01

    The West Valley Demonstration Project (WVDP), the site of a US Department of Energy environmental cleanup activity operated by West Valley Nuclear Services Co., Inc., (WVNS), is in the process of solidifying liquid high-level radioactive waste remaining at the site after commercial nuclear fuel reprocessing was discontinued. The Project is located in Western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1996 by environmental monitoring personnel. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. Appendix A is a summary of the site environmental monitoring schedule. Appendix B lists the environmental permits and regulations pertaining to the WVDP. Appendices C through F contain summaries of data obtained during 1996 and are intended for those interested in more detail than is provided in the main body of the report.

  4. Chicago Clean Air, Clean Water Project: Environmental Monitoring for a Healthy, Sustainable Urban Future

    SciTech Connect

    none, none; Tuchman, Nancy

    2015-11-11

    The U.S. Department of Energy awarded Loyola University Chicago and the Institute of Environmental Sustainability (IES) $486,000.00 for the proposal entitled “Chicago clean air, clean water project: Environmental monitoring for a healthy, sustainable urban future.” The project supported the purchase of analytical instruments for the development of an environmental analytical laboratory. The analytical laboratory is designed to support the testing of field water and soil samples for nutrients, industrial pollutants, heavy metals, and agricultural toxins, with special emphasis on testing Chicago regional soils and water affected by coal-based industry. Since the award was made in 2010, the IES has been launched (fall 2013), and the IES acquired a new state-of-the-art research and education facility on Loyola University Chicago’s Lakeshore campus. Two labs were included in the research and education facility. The second floor lab is the Ecology Laboratory where lab experiments and analyses are conducted on soil, plant, and water samples. The third floor lab is the Environmental Toxicology Lab where lab experiments on environmental toxins are conducted, as well as analytical tests conducted on water, soil, and plants. On the south end of the Environmental Toxicology Lab is the analytical instrumentation collection purchased from the present DOE grant, which is overseen by a full time Analytical Chemist (hired January 2016), who maintains the instruments, conducts analyses on samples, and helps to train faculty and undergraduate and graduate student researchers.

  5. Vadose zone microbiology

    SciTech Connect

    Kieft, Thomas L.; Brockman, Fred J.

    2001-01-17

    The vadose zone is defined as the portion of the terrestrial subsurface that extends from the land surface downward to the water table. As such, it comprises the surface soil (the rooting zone), the underlying subsoil, and the capillary fringe that directly overlies the water table. The unsaturated zone between the rooting zone and the capillary fringe is termed the "intermediate zone" (Chapelle, 1993). The vadose zone has also been defined as the unsaturated zone, since the sediment pores and/or rock fractures are generally not completely water filled, but instead contain both water and air. The latter characteristic results in the term "zone of aeration" to describe the vadose zone. The terms "vadose zone," "unsaturated zone", and "zone of aeration" are nearly synonymous, except that the vadose zone may contain regions of perched water that are actually saturated. The term "subsoil" has also been used for studies of shallow areas of the subsurface immediately below the rooting zone. This review focuses almost exclusively on the unsaturated region beneath the soil layer since there is already an extensive body of literature on surface soil microbial communities and process, e.g., Paul and Clark (1989), Metting (1993), Richter and Markowitz, (1995), and Sylvia et al. (1998); whereas the deeper strata of the unsaturated zone have only recently come under scrutiny for their microbiological properties.

  6. Microbiological methodology in astrobiology

    NASA Astrophysics Data System (ADS)

    Abyzov, S. S.; Gerasimenko, L. M.; Hoover, R. B.; Mitskevich, I. N.; Mulyukin, A. L.; Poglazova, M. N.; Rozanov, A. Y.

    2005-09-01

    Searching for life in astromaterials to be delivered from the future missions to extraterrestrial bodies is undoubtedly related to studies of the properties and signatures of living microbial cells and microfossils on Earth. The Antarctic glacier and Earth permafrost habitats, where living microbial cells preserved viability for millennia years due to entering the anabiotic state, are often regarded as terrestrial analogs of Martian polar subsurface layers. For the future findings of viable microorganisms in samples from extraterrestrial objects, it is important to use a combined methodology that includes classical microbiological methods, plating onto nutrient media, direct epifluorescence and electron microscopy examinations, detection of the elemental composition of cells, PCR and FISH methods. Of great importance is to ensure authenticity of microorganisms (if any in studied samples) and to standardize the protocols used to minimize a risk of external contamination. Although the convincing evidence of extraterrestrial microbial life will may come from the discovery of living cells in astromaterials, biomorphs and microfossils must also be regarded as a target in search of life evidence bearing in mind a scenario that living microorganisms had not been preserved and underwent mineralization. Regarding the vital importance of distinguishing between biogenic and abiogenic signatures and between living and fossil microorganisms in analyzed samples, it is worthwhile to use previously developed approaches based on electron microscopy examinations and analysis of elemental composition of biomorphs in situ.

  7. Superresolution microscopy for microbiology

    PubMed Central

    Coltharp, Carla; Xiao, Jie

    2014-01-01

    Summary This review provides a practical introduction to superresolution microscopy from the perspective of microbiological research. Because of the small sizes of bacterial cells, superresolution methods are particularly powerful and suitable for revealing details of cellular structures that are not resolvable under conventional fluorescence light microscopy. Here we describe the methodological concepts behind three major categories of super-resolution light microscopy: photoactivated localization microscopy (PALM) and stochastic optical reconstruction microscopy (STORM), structured illumination microscopy (SIM) and stimulated emission-depletion (STED) microscopy. We then present recent applications of each of these techniques to microbial systems, which have revealed novel conformations of cellular structures and described new properties of in vivo protein function and interactions. Finally, we discuss the unique issues related to implementing each of these superresolution techniques with bacterial specimens and suggest avenues for future development. The goal of this review is to provide the necessary technical background for interested microbiologists to choose the appropriate super-resolution method for their biological systems, and to introduce the practical considerations required for designing and analysing superresolution imaging experiments. PMID:22947061

  8. IPMP 2013 - A comprehensive data analysis tool for predictive microbiology

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Predictive microbiology is an area of applied research in food science that uses mathematical models to predict the changes in the population of pathogenic or spoilage microorganisms in foods undergoing complex environmental changes during processing, transportation, distribution, and storage. It f...

  9. Critical Readiness Review EHS Water Quality and Microbiology

    NASA Technical Reports Server (NTRS)

    Woo, Cindy

    2010-01-01

    Presentation reviews the status in reference to the Environmental, Health and Safety (EHS) of the water quality and microbiology for the International Space Station. It includes information about crew training, hardware delivery, and those items that will be returned for study.

  10. Skylab environmental and crew microbiology studies

    NASA Technical Reports Server (NTRS)

    Taylor, G. R.; Graves, R. C.; Brockett, R. M.; Ferguson, J. K.; Mieszkuc, B. J.

    1977-01-01

    Microbial flora samples were collected from crewmembers before, during, and after missions in order to obtain data on the microbial response to space flight environment. Data showed that, while gross contamination of the Skylab environment was demonstrated and there were several in-flight disease events, such events are not limiting hazards for long term manned space flights. Intercrew transfer of pathogens was demonstrated, but evidence of postflight microbial shock was not found.

  11. Environmental microbiology as related to planetary quarantine

    NASA Technical Reports Server (NTRS)

    Pflug, I. J.

    1974-01-01

    Continued experimental work related to dry heat resistance of microorganisms. One phase of this research has been concerned with the viability and dry heat resistance of indigenous microflora associated with small soil particles. The second part of this report is an analysis of the present status of dry heat sterilization. An attempt is made to integrate results for both laboratory grown spores and spores in soil.

  12. Environmental microbiology as related to planetary quarantine

    NASA Technical Reports Server (NTRS)

    Iflug, I. J.

    1971-01-01

    The results of studies to determine the effect of soil particle size on the survival time at 125 C of the microflora associated with these particles are discussed. The data suggest that longer survival times exist for the microflora associated with larger particles. The studies indicate that microorganisms associated with soil are difficult to kill and that organisms associated with large particles are harder to kill than those associated with small particles. Sterlization requirements increase as the level of contamination increases. Soil particles and their accompanying microflora are the most critical contaminants.

  13. Environmental Scanning as a Public Health Tool: Kentucky's Human Papillomavirus Vaccination Project.

    PubMed

    Wilburn, Amanda; Vanderpool, Robin C; Knight, Jennifer R

    2016-01-01

    Borrowing from business, quality improvement programs, and strategic planning principles, environmental scanning is gaining popularity in public health practice and research and is advocated as an assessment and data collection tool by federal funding agencies and other health-related organizations. Applicable to a range of current and emerging health topics, environmental scans - through various methods - assess multiple facets of an issue by engaging stakeholders who can ask or answer research questions, exploring related policy, critiquing published and gray literature, collecting and analyzing qualitative and quantitative data in both primary and secondary forms, disseminating findings to internal and external stakeholders, and informing subsequent planning and decision making. To illustrate the environmental scanning process in a public health setting and showcase its value to practitioners in the field, we describe a federally funded environmental scan for a human papillomavirus vaccination project in Kentucky. PMID:27536901

  14. Environmental Scanning as a Public Health Tool: Kentucky’s Human Papillomavirus Vaccination Project

    PubMed Central

    Wilburn, Amanda; Knight, Jennifer R.

    2016-01-01

    Borrowing from business, quality improvement programs, and strategic planning principles, environmental scanning is gaining popularity in public health practice and research and is advocated as an assessment and data collection tool by federal funding agencies and other health-related organizations. Applicable to a range of current and emerging health topics, environmental scans — through various methods — assess multiple facets of an issue by engaging stakeholders who can ask or answer research questions, exploring related policy, critiquing published and gray literature, collecting and analyzing qualitative and quantitative data in both primary and secondary forms, disseminating findings to internal and external stakeholders, and informing subsequent planning and decision making. To illustrate the environmental scanning process in a public health setting and showcase its value to practitioners in the field, we describe a federally funded environmental scan for a human papillomavirus vaccination project in Kentucky. PMID:27536901

  15. Environmental assessment for the A-01 outfall constructed wetlands project at the Savannah River Site

    SciTech Connect

    1998-10-01

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021).

  16. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    SciTech Connect

    West Valley Environmental Services LLC and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  17. Environmental assessment for Mound Plant decontamination and decommissioning projects, Mound Plant, Miamisburg, Ohio

    SciTech Connect

    1995-05-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) for seven decontamination and decommissioning (D&D) projects at the Mound Plant in Miamisburg, Ohio, that have not been previously addressed in the Final Environmental Impact Statement for the Mound Facility (June 1979). Based on the information presented in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and the Department is issuing this Finding of No Significant Impact (FONSI).

  18. Development of Distributed Research Center for monitoring and projecting regional climatic and environmental changes: first results

    NASA Astrophysics Data System (ADS)

    Gordov, Evgeny; Shiklomanov, Alexander; Okladinikov, Igor; Prusevich, Alex; Titov, Alexander

    2016-04-01

    Description and first results of the cooperative project "Development of Distributed Research Center for monitoring and projecting of regional climatic and environmental changes" recently started by SCERT IMCES and ESRC UNH are reported. The project is aimed at development of hardware and software platform prototype of Distributed Research Center (DRC) for monitoring and projecting regional climatic and environmental changes over the areas of mutual interest and demonstration the benefits of such collaboration that complements skills and regional knowledge across the northern extratropics. In the framework of the project, innovative approaches of "cloud" processing and analysis of large geospatial datasets will be developed on the technical platforms of two U.S. and Russian leading institutions involved in research of climate change and its consequences. Anticipated results will create a pathway for development and deployment of thematic international virtual research centers focused on interdisciplinary environmental studies by international research teams. DRC under development will comprise best features and functionality of earlier developed by the cooperating teams' information-computational systems RIMS (http://rims.unh.edu) and CLIMATE(http://climate.scert.ru/), which are widely used in Northern Eurasia environment studies. The project includes several major directions of research (Tasks) listed below. 1. Development of architecture and defining major hardware and software components of DRC for monitoring and projecting of regional environmental changes. 2. Development of an information database and computing software suite for distributed processing and analysis of large geospatial data hosted at ESRC and IMCES SB RAS. 3. Development of geoportal, thematic web client and web services providing international research teams with an access to "cloud" computing resources at DRC; two options will be executed: access through a basic graphical web browser and

  19. Environmental sustainability in an agricultural development project: a system dynamics approach.

    PubMed

    Saysel, Ali Kerem; Barlas, Yaman; Yenigün, Orhan

    2002-03-01

    Regional agricultural projects based on water resource development have many potential impacts on social and natural environments. In this research, potential long-term environmental problems of the Southeastern Anatolian Project (GAP) related to water resources, land use, land degradation, agricultural pollution and demography are analysed from a systems perspective. The analysis focuses on the totality of environmental, social and economic issues. For this purpose, a system dynamics simulation model (GAPSIM) has been developed as an experimental platform for policy analysis. GAPSIM was validated, first 'structurally', using the tests suggested by the literature and then the model 'behaviour' was tested and calibrated with respect to available data. The reference behaviour of GAPSIM reveals that, as the irrigated lands are developed, GAP faces significant water scarcity because of the increased intensity of cotton, the crop with the highest demands for water. Simulation results also indicate that two key environmental factors, pesticide and fertilizer consumption may reach undesirable levels. Alternative irrigation water release strategies, development rates of irrigated fields and farm rotation practices appear as important policy tools in achieving long-term environmental sustainability. GAPSIM promises to be not only a useful laboratory for policy makers of GAP, but also a useful generic structure applicable to other similar regional development projects. PMID:12040958

  20. 76 FR 12096 - McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Energy Regulatory Commission McCloud-Pit Project; Notice of Availability of the Final Environmental... reviewed the application for license for the McCloud-Pit Hydroelectric Project (FERC No. 2106), located on the McCloud and Pit Rivers in Shasta County, California and has prepared a final environmental...