Sample records for project final safety

  1. Subsistence restoration project: Food safety testing. Exxon Valdez Oil Spill Restoration Project. Final report restoration project 94279

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miraglia, R.A.; Chartrand, A.W.

    1997-05-01

    The goal of this project was to restore the confidence of subsistence users in their abilities to determine the safety of their resources. Methods included community meetings, collection and testing of subsistence resources samples for hydrocarbon contamination, accompanying community representatives on tours of the laboratory where tests were conducted and informational newsletters. Over the two years of the project combined, 228 composite samples of edible tissues from shellfish were tested. The bile of forty rockfish, six sockeye salmon, twelve seals, twenty-three ducks were tested for the presence of hydrocarbon metabolites. Edible tissue (blubber) from seals was also tested. Generally, themore » tests showed such low levels of hydrocarbons and their metabolites, as to be within the test`s margin of error. The project was partly successful in disseminating the subsistence food safety advice of the Oil Spill Health Task Force and in improving the level of trust in the results of hydrocarbon tests on the resources.« less

  2. Standards Improvement Project-Phase II. Final rule.

    PubMed

    2005-01-05

    The Occupational Safety and Health Administration (OSHA) through this final rule is continuing to remove and revise provisions of its standards that are outdated, duplicative, unnecessary, or inconsistent, or can be clarified or simplified by being written in plain language. The Agency completed Phase I of the Standards Improvement Project in June 1998. In this Phase II of the Standards Improvement Project, OSHA is again revising or removing a number of health provisions in its standards for general industry, shipyard employment, and construction. The Agency believes that the changes streamline and make more consistent the regulatory requirements in OSHA health and safety standards. In some cases, OSHA has made substantive revisions to requirements because they are outdated, duplicative, unnecessary, or inconsistent with more recently promulgated health standards. The Agency believes these revisions will reduce regulatory requirements for employers without reducing employee protection.

  3. Advanced Air Transportation Technologies Project, Final Document Collection

    NASA Technical Reports Server (NTRS)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  4. Onboard Monitoring and Reporting for Commercial Motor Vehicle Safety Final Report

    DOT National Transportation Integrated Search

    2008-02-01

    This Final Report describes the process and product from the project, Onboard Monitoring and Reporting for Commercial Motor Vehicle Safety (OBMS), in which a prototypical suite of hardware and software on a class 8 truck was developed and tested. The...

  5. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    PubMed

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them.

  6. Systemic safety project selection tool.

    DOT National Transportation Integrated Search

    2013-07-01

    "The Systemic Safety Project Selection Tool presents a process for incorporating systemic safety planning into traditional safety management processes. The Systemic Tool provides a step-by-step process for conducting systemic safety analysis; conside...

  7. Effective Safety Management in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  8. Onboard Safety Technology Survey Synthesis - Final Report

    DOT National Transportation Integrated Search

    2008-01-01

    The Federal Motor Carrier Safety Administration (FMCSA) funded this project to collect, merge, and conduct an assessment of onboard safety system surveys and resulting data sets that may benefit commercial vehicle operations safety and future researc...

  9. Patterns in Safety-Related Projects

    NASA Astrophysics Data System (ADS)

    Parsons, Mike; Hunter, Charles

    Within Logica UK, safety-related projects are run in a variety of ways depending on the constraints imposed and how the risks and mitigations are owned and handled. A total of eight different types of project development patterns have been identified and this paper discusses each type. A simple decision tool has been developed based on the patterns which is used as an aid in deciding how to bid a safety project, allowing tradeoffs between risk ownership, development methods and cost to be assessed.

  10. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  11. Urban construction and safety project

    NASA Technical Reports Server (NTRS)

    Hogarth, P. T.

    1976-01-01

    Technology utilization projects in the area of urban construction and safety included the following: development of undercarpet and baseboard flat conductor cables, flood insurance studies, tornado safety engineering, the Project TECH house at the Langley Research Center, assistance to the City of Atlanta in their environmental habitability and resource allocation program, and market assessment of a solid state diesel engine controller. The flat conductor cable and the flood insurance studies are given particular attention.

  12. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  13. 77 FR 59551 - Safety Zone, Changes to Original Rule; Boston Harbor's Rock Removal Project, Boston Inner Harbor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0767] RIN 1625-AA00 Safety Zone, Changes to Original Rule; Boston Harbor's Rock Removal Project, Boston Inner Harbor... original provisions of that temporary final rule, but adds two additional safety zones necessary for the...

  14. The Amherst Project. Final Report.

    ERIC Educational Resources Information Center

    Hampshire Coll., Amherst, MA.

    This final report submitted by the Committee on the Study of History at Hampshire College describes the Amherst Project, a research and development project devoted to fostering the newer inquiry approaches in the study of United States history. The project's main focus has been on secondary schools, but has also encompassed junior high and adult…

  15. Transit safety retrofit package development : final report.

    DOT National Transportation Integrated Search

    2014-07-01

    This report provides a summary of the Transit Safety Retrofit Package (TRP) Development project and its results. The report documents results of each project phase, and provides recommended next steps as well as a vision for a next generation TRP. Th...

  16. NASA Safety and Health (Short Form). Final rule

    NASA Technical Reports Server (NTRS)

    2001-01-01

    This final rule adopts with changes the interim rule published in the Federal Register on April 5, 2001 (65 FR 18051-18053), which amended the NASA FAR Supplement to implement a Safety and Health (Short Form) clause to address safety and occupational health in all NASA contracts above the micro-purchase threshold where the existing Safety and Health clause did not apply, and amended other safety and health clauses to be consistent with the new NASA Safety and Health (Short Form) clause.

  17. Preoperative Safety Briefing Project

    PubMed Central

    DeFontes, James; Surbida, Stephanie

    2004-01-01

    Context: Increased media attention on surgical procedures that were performed on the wrong anatomic site or wrong patient has prompted the health care industry to identify and address human factors that lead to medical errors. Objective: To increase patient safety in the perioperative setting, our objective was to create a climate of improved communication, collaboration, team-work, and situational awareness while the surgical team reviewed pertinent information about the patient and the pending procedure. Methods: A team of doctors, nurses, and technicians used human factors principles to develop the Preoperative Safety Briefing for use by surgical teams, a briefing similar to the preflight checklist used by the airline industry. A six-month pilot of the briefing began in the Kaiser Permanente (KP) Anaheim Medical Center in February 2002. Four indicators of safety culture were used to measure success of the pilot: occurrence of wrong-site/wrong procedures, attitudinal survey data, near-miss reports, and nursing personnel turnover data. Results: Wrong-site surgeries decreased from 3 to 0 (300%) per year; employee satisfaction increased 19%; nursing personnel turnover decreased 16%; and perception of the safety climate in the operating room improved from “good” to “outstanding.” Operating suite personnel perception of teamwork quality improved substantially. Operating suite personnel perception of patient safety as a priority, of personnel communication, of their taking responsibility for patient safety, of nurse input being well received, of overall morale, and of medical errors being handled appropriately also improved substantially. Conclusions: Team members who work together and communicate well can quickly detect and more easily avoid errors. The Preoperative Safety Briefing is now standard in many operating suites in the KP Orange County Service Area. The concepts and design of this project are transferable, and similar projects are underway in the

  18. NASA's Aviation Safety and Modeling Project

    NASA Technical Reports Server (NTRS)

    Chidester, Thomas R.; Statler, Irving C.

    2006-01-01

    The Aviation Safety Monitoring and Modeling (ASMM) Project of NASA's Aviation Safety program is cultivating sources of data and developing automated computer hardware and software to facilitate efficient, comprehensive, and accurate analyses of the data collected from large, heterogeneous databases throughout the national aviation system. The ASMM addresses the need to provide means for increasing safety by enabling the identification and correcting of predisposing conditions that could lead to accidents or to incidents that pose aviation risks. A major component of the ASMM Project is the Aviation Performance Measuring System (APMS), which is developing the next generation of software tools for analyzing and interpreting flight data.

  19. Use of safety management practices for improving project performance.

    PubMed

    Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal

    2015-01-01

    Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.

  20. Project LIFE, 1963-1975. Final Report.

    ERIC Educational Resources Information Center

    Pfau, Glenn S.

    Presented is the final report on Project Life (Language Improvement to Facilitate Education), a 12-year (1963-75) project which developed filmstrips and supplementary materials for teaching language to deaf children. General overview and historical review sections include information on project goals and objectives, administration agencies and…

  1. The Trine Project Final Report.

    ERIC Educational Resources Information Center

    Gunderson, Jon R.; And Others

    The final report describes the Trine Project which addressed three needs in the education of handicapped children: the need for an alternate writing system, the need for communication, and the need for access to general purpose computers used in the schools. The project had three major objectives: (1) to design a low-cost portable writing and…

  2. Competency-Based Transfer Pilot Project--Final Report. Executive Summary [and] Competency-Based Transfer Pilot Project: Final Report on House Bill 1909

    ERIC Educational Resources Information Center

    Washington Higher Education Coordinating Board, 2006

    2006-01-01

    This publication contains the following: (1) Competency-Based Transfer Pilot Project--Final Report. Executive Summary (January 2006); and (2) Competency-Based Transfer Pilot Project: Final Report on House Bill 1909 (January 2005). In 2003, the legislature and governor enacted House Bill 1909 to create a pilot project on competency-based transfer…

  3. The Development of Project Orion Ground Safety Requirements

    NASA Technical Reports Server (NTRS)

    Kirkpatrick, Paul; Condzella, Bill; Williams, Jeff

    2011-01-01

    In spite of a very compressed schedule, Project Orion's AFT safety team was able to pull together a comprehensive set of ground safety requirements using existing requirements and subject matter experts. These requirements will serve as the basis for the design of GSE and ground operations. Using the above lessons as a roadmap, new Projects can produce the same results. A rigorous set of ground safety requirements is required to assure ground support equipment (GSE) and associated flight hardware ground operations are conducted safety

  4. Evaluating Performance of Highway Safety Projects

    DOT National Transportation Integrated Search

    2016-12-01

    The purpose of this project was to investigate and document methods that the Idaho Transportation Department (ITD) and Local Highway Technical Assistance Council (LHTAC) can use to evaluate the performance of safety projects that have been implemente...

  5. Bayesian-network-based safety risk assessment for steel construction projects.

    PubMed

    Leu, Sou-Sen; Chang, Ching-Miao

    2013-05-01

    There are four primary accident types at steel building construction (SC) projects: falls (tumbles), object falls, object collapse, and electrocution. Several systematic safety risk assessment approaches, such as fault tree analysis (FTA) and failure mode and effect criticality analysis (FMECA), have been used to evaluate safety risks at SC projects. However, these traditional methods ineffectively address dependencies among safety factors at various levels that fail to provide early warnings to prevent occupational accidents. To overcome the limitations of traditional approaches, this study addresses the development of a safety risk-assessment model for SC projects by establishing the Bayesian networks (BN) based on fault tree (FT) transformation. The BN-based safety risk-assessment model was validated against the safety inspection records of six SC building projects and nine projects in which site accidents occurred. The ranks of posterior probabilities from the BN model were highly consistent with the accidents that occurred at each project site. The model accurately provides site safety-management abilities by calculating the probabilities of safety risks and further analyzing the causes of accidents based on their relationships in BNs. In practice, based on the analysis of accident risks and significant safety factors, proper preventive safety management strategies can be established to reduce the occurrence of accidents on SC sites. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  7. Connected commercial vehicles — retrofit safety device kit project : final report.

    DOT National Transportation Integrated Search

    2014-03-01

    Connected vehicle wireless data communications can enable safety applications that may reduce injuries and fatalities. Cooperative vehicle-to-vehicle (V2V) safety applications will be effective only if a high fraction of vehicles are equipped. Deploy...

  8. The Development and Implementation of Ground Safety Requirements for Project Orion Abort Flight Testing - A Case Study

    NASA Technical Reports Server (NTRS)

    Kirkpatrick, Paul D.; Williams, Jeffrey G.; Condzella, Bill R.

    2008-01-01

    A rigorous set of detailed ground safety requirements is required to make sure that ground support equipment (GSE) and associated planned ground operations are conducted safely. Detailed ground safety requirements supplement the GSE requirements already called out in NASA-STD-5005. This paper will describe the initial genesis of these ground safety requirements, the establishment and approval process and finally the implementation process for Project Orion. The future of the requirements will also be described. Problems and issues encountered and overcame will be discussed.

  9. Final Project Report for Award ER65581

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stoy, Paul C.

    2017-07-13

    The attached final project report describes contributions of Montana State University (MSU) to the project "Bridging land-surface fluxes and aerosol concentrations to triggering convective rainfall" (PI: Fuentes).

  10. Assessment of contributions to patient safety knowledge by the Agency for Healthcare Research and Quality-funded patient safety projects.

    PubMed

    Sorbero, Melony E S; Ricci, Karen A; Lovejoy, Susan; Haviland, Amelia M; Smith, Linda; Bradley, Lily A; Hiatt, Liisa; Farley, Donna O

    2009-04-01

    To characterize the activities of projects funded in Agency for Healthcare Research and Quality (AHRQ)'s patient safety portfolio and assess their aggregate potential to contribute to knowledge development. Information abstracted from proposals for projects funded in AHRQ's patient safety portfolio, information on safety practices from the AHRQ Evidence Report on Patient Safety Practices, and products produced by the projects. This represented one part of the process evaluation conducted as part of a longitudinal evaluation based on the Context–Input–Process–Product model. The 234 projects funded through AHRQ's patient safety portfolio examined a wide variety of patient safety issues and extended their work beyond the hospital setting to less studied parts of the health care system. Many of the projects implemented and tested practices for which the patient safety evidence report identified a need for additional evidence. The funded projects also generated a substantial body of new patient safety knowledge through a growing number of journal articles and other products. The projects funded in AHRQ's patient safety portfolio have the potential to make substantial contributions to the knowledge base on patient safety. The full value of this new knowledge remains to be confirmed through the synthesis of results

  11. Construction safety monitoring based on the project's characteristic with fuzzy logic approach

    NASA Astrophysics Data System (ADS)

    Winanda, Lila Ayu Ratna; Adi, Trijoko Wahyu; Anwar, Nadjadji; Wahyuni, Febriana Santi

    2017-11-01

    Construction workers accident is the highest number compared with other industries and falls are the main cause of fatal and serious injuries in high rise projects. Generally, construction workers accidents are caused by unsafe act and unsafe condition that can occur separately or together, thus a safety monitoring system based on influencing factors is needed to achieve zero accident in construction industry. The dynamic characteristic in construction causes high mobility for workers while doing the task, so it requires a continuously monitoring system to detect unsafe condition and to protect workers from potential hazards. In accordance with the unique nature of project, fuzzy logic approach is one of the appropriate methods for workers safety monitoring on site. In this study, the focus of discussion is based on the characteristic of construction projects in analyzing "potential hazard" and the "protection planning" to be used in accident prevention. The data have been collected from literature review, expert opinion and institution of safety and health. This data used to determine hazard identification. Then, an application model is created using Delphi programming. The process in fuzzy is divided into fuzzification, inference and defuzzification, according to the data collection. Then, the input and final output data are given back to the expert for assessment as a validation of application model. The result of the study showed that the potential hazard of construction workers accident could be analysed based on characteristic of project and protection system on site and fuzzy logic approach can be used for construction workers accident analysis. Based on case study and the feedback assessment from expert, it showed that the application model can be used as one of the safety monitoring tools.

  12. Relational approach in managing construction project safety: a social capital perspective.

    PubMed

    Koh, Tas Yong; Rowlinson, Steve

    2012-09-01

    Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.

  13. 75 FR 61619 - Safety Zone; IJSBA World Finals, Lower Colorado River, Lake Havasu, AZ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ...-AA00 Safety Zone; IJSBA World Finals, Lower Colorado River, Lake Havasu, AZ AGENCY: Coast Guard, DHS... Sports Boating Association (IJSBA) World Finals. This temporary safety zone is necessary to provide for... notice of proposed rulemaking (NPRM) entitled Safety Zone; IJSBA World Finals in the Federal Register (75...

  14. Mechanical Engineering Senior Design Project Final Presentations | College

    Science.gov Websites

    Mechanical Engineering Senior Design Project Final Presentations December 7, 2015 Mechanical Engineering On Wednesday, Dec. 9th, the mechanical engineering senior design project final presentations will be made in and Steven Keller Objective: Design a temperature controlled unit that would cool and maintain a

  15. Skills Conversion Project: Chapter 17, Occupational Safety and Health. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The greatest employment opportunity for safety professionals at the present time is with the Department of Labor for enforcement of the Williams-Steiger Act, which establishes the Occupational Safety and Health Administration (OSHA). As part of a federal study of job possibilities for displaced aerospace and defense technical professionals, it was…

  16. Evaluation of pedestrian safety campaigns : final report.

    DOT National Transportation Integrated Search

    2004-02-01

    The objective of the study was to determine the efficacy and success of SHAs public service campaign : regarding pedestrian safety. Data collection issues forced a change in this focus as the project progressed. : The study contains two issues tha...

  17. Assessment of Contributions to Patient Safety Knowledge by the Agency for Healthcare Research and Quality-Funded Patient Safety Projects

    PubMed Central

    Sorbero, Melony E S; Ricci, Karen A; Lovejoy, Susan; Haviland, Amelia M; Smith, Linda; Bradley, Lily A; Hiatt, Liisa; Farley, Donna O

    2009-01-01

    Objective To characterize the activities of projects funded in Agency for Healthcare Research and Quality (AHRQ)' patient safety portfolio and assess their aggregate potential to contribute to knowledge development. Data Sources Information abstracted from proposals for projects funded in AHRQ' patient safety portfolio, information on safety practices from the AHRQ Evidence Report on Patient Safety Practices, and products produced by the projects. Study Design This represented one part of the process evaluation conducted as part of a longitudinal evaluation based on the Context–Input–Process–Product model. Principal Findings The 234 projects funded through AHRQ' patient safety portfolio examined a wide variety of patient safety issues and extended their work beyond the hospital setting to less studied parts of the health care system. Many of the projects implemented and tested practices for which the patient safety evidence report identified a need for additional evidence. The funded projects also generated a substantial body of new patient safety knowledge through a growing number of journal articles and other products. Conclusions The projects funded in AHRQ' patient safety portfolio have the potential to make substantial contributions to the knowledge base on patient safety. The full value of this new knowledge remains to be confirmed through the synthesis of results. PMID:21456108

  18. Safety incentive and penalty provisions in Indian construction projects and their impact on safety performance.

    PubMed

    Hasan, Abid; Jha, Kumar Neeraj

    2013-01-01

    Safety incentive and penalty (I/P) provisions in construction contracts are one of the most common forms of I/P. Contradictory opinions on the effectiveness of these provisions have been expressed in the literature. Statistics on safety provisions were collected from 32 construction projects, which include both types of contracts - those with safety I/P provisions and those without them. Although inclusion of safety I/P provisions in contracts helps in improving the overall safety performance in construction projects, further scope for improvement still exists. Literature review and structured personal interviews, coupled with a survey based on preliminary questionnaire, revealed that successful formulation and implementation of such provisions are dependent on 25 attributes which need the attention of both clients and contractors. A questionnaire-based survey was conducted to evaluate these attributes. The six factors extracted by carrying out factor analysis are: incentive distribution method, proper labour training, special attention to risky situations, role of safety committee and sub-contractors, specialised works and safety equipments, and right form of I/P. If taken care of, these attributes have the potential to improve the safety performance in construction projects. The results would be useful to clients and contractors in implementing the safety I/P provisions and thereby improving safety performance.

  19. 2+2+2 Dissemination Project Final Report.

    ERIC Educational Resources Information Center

    Sloane, Diana; And Others

    An overview is provided in this three-part final report of a project designed to disseminate information to assist California high schools, Regional Occupation Programs, and colleges in developing and strengthening 2+2+2 programs. Part I reviews the following project objectives: (1) hire a project coordinator and technical assistant; (2) develop a…

  20. TA-55 Final Safety Analysis Report Comparison Document and DOE Safety Evaluation Report Requirements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alan Bond

    2001-04-01

    This document provides an overview of changes to the currently approved TA-55 Final Safety Analysis Report (FSAR) that are included in the upgraded FSAR. The DOE Safety Evaluation Report (SER) requirements that are incorporated into the upgraded FSAR are briefly discussed to provide the starting point in the FSAR with respect to the SER requirements.

  1. Vehicle Safety Communications project task 3 final report : identify intelligent vehicle safety applications enabled by DSRC

    DOT National Transportation Integrated Search

    2005-03-01

    The Crash Avoidance Metrics Partnership (CAMP) Vehicle Safety Communications Consortium (VSCC) comprised of BMW, DaimlerChrysler, Ford, GM, Nissan, Toyota, and Volkswagen, in partnership with USDOT, established the Vehicle Safety Communications (VSC)...

  2. Project safety as a sustainable competitive advantage.

    PubMed

    Rechenthin, David

    2004-01-01

    To be consistently profitable, a construction company must complete projects in scope, on schedule, and on budget. At the same time, the nature of the often high-risk work performed by construction companies can result in high accident rates. Clients and other stakeholders are placing increasing pressure on companies to decrease those accident rates. Clients routinely demand copies of safety plans and evidence of past results at the "pre-qualification" or "request for proposal" stages of the procurement process. Are high accident rates and the associated costs just a part of business? Companies that deliver on scope, schedule, and budget have a competitive advantage. Is it possible for projects with low accident rates to use it as a competitive advantage? Is the value added by safety just a temporary or parity issue, or does a successful safety program offer significant advantage to the company and the client? This article concludes that in the case of a high-risk industry, such as the construction industry, an organization with a successful safety program can promote safety performance as a sustainable competitive advantage. It is a choice the company can make.

  3. Advanced spacecraft fire safety: Proposed projects and program plan

    NASA Technical Reports Server (NTRS)

    Youngblood, Wallace W.; Vedha-Nayagam, M.

    1989-01-01

    A detailed review identifies spacecraft fire safety issues and the efforts for their resolution, particularly for the threats posed by the increased on-orbit duration, size, and complexity of the Space Station Freedom. Suggestions provided by a survey of Wyle consultants and outside fire safety experts were combined into 30 research and engineering projects. The projects were then prioritized with respect to urgency to meet Freedom design goals, status of enabling technology, cost, and so on, to yield 14 highest priority projects, described in terms of background, work breakdown structure, and schedule. These highest priority projects can be grouped into the thematic areas of fire detection, fire extinguishment, risk assessment, toxicology and human effects, and ground based testing. Recommendations for overall program management stress the need for NASA Headquarters and field center coordination, with information exchange through spacecraft fire safety oversight committees.

  4. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2013-01-01 2013-01-01 false Contents of applications; technical information in final...

  5. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2012-01-01 2012-01-01 false Contents of applications; technical information in final...

  6. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2014-01-01 2014-01-01 false Contents of applications; technical information in final...

  7. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2011-01-01 2011-01-01 false Contents of applications; technical information in final...

  8. Hawaii State Plan for Occupational Safety and Health. Final rule.

    PubMed

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  9. Rural Textile Workers Literacy Enhancement Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    This document consists of the final report and sample curricula from the Rural Textile Workers Literacy Enhancement Project. The final report details how the project was initiated in April 1993 to help employees of five textile and apparel manufacturing companies in southeastern Alabama improve their literacy and numeracy skills. A second…

  10. Updating fire safety standards. Final rule; affirmation.

    PubMed

    2011-11-16

    This document affirms as final, without changes, a provision included in a final rule with request for comments that amended the Department of Veterans Affairs (VA) regulations concerning community residential care facilities, contract facilities for certain outpatient and residential services, and State home facilities. That provision established a five-year period within which all covered buildings with nursing home facilities existing as of June 25, 2001, must conform to the automatic sprinkler requirement of the 2009 edition of the National Fire Protection Association (NFPA) 101. This rule helps ensure the safety of veterans in the affected facilities.

  11. 76 FR 61261 - Safety Zone; IJSBA World Finals; Lower Colorado River, Lake Havasu, AZ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ...-AA00 Safety Zone; IJSBA World Finals; Lower Colorado River, Lake Havasu, AZ AGENCY: Coast Guard, DHS... Boating Association (IJSBA) World Finals. This temporary safety zone is necessary to provide for the... The International Jet Sports Boating Association is sponsoring the IJSBA World Finals. The event will...

  12. Multihandicapped Blind. Final Project Report.

    ERIC Educational Resources Information Center

    Jones, Lloyd

    The final report of the Garden Grove unified school district project for 1969 through 1972 (funded through Title III) involving six multiply handicapped, legally blind children, 7- to 10-years-old, who were previously excluded from special education (SE) classes is presented. Described as the main procedural objective is development of a…

  13. 76 FR 53051 - Safety Zone; ISAF Nations Cup Grand Final Fireworks Display, Sheboygan, WI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ...-AA00 Safety Zone; ISAF Nations Cup Grand Final Fireworks Display, Sheboygan, WI AGENCY: Coast Guard.... Background and Purpose The ISAF Nations Cup Grand Final fireworks are a City permitted fireworks display that.... 165.T09-0755 Safety Zone; ISAF Nations Cup Grand Final Fireworks Display, Sheboygan, Wisconsin. (a...

  14. School Safety Project: Product Evaluation, 1990-1991.

    ERIC Educational Resources Information Center

    Saginaw Public Schools, MI. Dept. of Evaluation Services.

    A districtwide school safety project implemented in Saginaw, Michigan, in 1990-91, the third year of its operation, is evaluated in this report. The project is evaluated on the basis of the following objectives: employment and training of home-school liaison officers; establishment of an advisory council; development and implementation of…

  15. Interagency Planning and Support Project. Final Report.

    ERIC Educational Resources Information Center

    Salisbury, Christine

    This final report describes the activities and outcomes of a federally funded project designed to develop, implement, and evaluate a systemically oriented process model for improving the coordination of education and human services for young children with identified disabilities and their families at the local level. The project developed and used…

  16. Safety equipment list for the 241-SY-101 RAPID mitigation project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MORRIS, K.L.

    1999-06-29

    This document provides the safety classification for the safety (safety class and safety RAPID Mitigation Project. This document is being issued as the project SEL until the supporting authorization basis documentation, this document will be superseded by the TWRS SEL (LMHC 1999), documentation istlralized. Upon implementation of the authorization basis significant) structures, systems, and components (SSCS) associated with the 241-SY-1O1 which will be updated to include the information contained herein.

  17. Urban construction and safety project

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The purpose and functions of NASA technology applications temas (TAT) are described, with emphasis on the activities of the Urban and Construction and Safety Project. The transfer and implementation of technology is discussed in five activities. Topics include: flat conductor cable, NASA house and compendium, flood insurance studies, tornado studies, and the controller for stationary diesels.

  18. The Northern Virginia Supported Employment "Safety Nets" Demonstration Project. Final Evaluation Report (for October 1, 1991, through September 30, 1992).

    ERIC Educational Resources Information Center

    Wurbacher and Associates, Takoma Park, MD.

    This report describes results and conclusions of a third-party evaluation of a 1-year demonstration project in Alexandria (Virginia) to develop "safety nets" for 12 people with disabilities who were either unemployed or with a history of unemployment. An Employment Security Specialist worked with these individuals and their families to:…

  19. Georgia Deaf-Blind Pilot Project: Project EPIC. Final Report. Optional Pilot Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of Project EPIC (Effective Partner Interaction in the Community), a 3-year federally supported project in Georgia to facilitate the establishment and implementation of effective educational practices with students having deaf-blindness. The project was designed to expand students' present…

  20. Final Technical Report- Virginia Solar Pathways Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bond, Katharine; Cosby, Sarah

    This Report provides a technical review of the final results of a funding award to Virginia Electric and Power Company (Dominion Energy Virginia (DEV) or the Company) for a project under the U.S. Department of Energy’s Solar Energy Technologies Office. The three-year project was formally known as the Virginia Solar Pathways Project (VSPP or the Project). The purpose of the VSPP was to develop a collaborative utility-administered solar strategy (Solar Strategy) for DEV’s service territory in the Commonwealth that could serve as a replicable model for other states with similar policy environments.

  1. I-25 truck safety improvements project : local evaluation report

    DOT National Transportation Integrated Search

    2004-12-29

    The I-25 Truck Safety Improvements project (I-25 TSIP) is the result of a FY98 congressionally designated earmark to support improvements in transportation efficiency, promote safety, increase traffic flow, reduce emissions, improve traveler informat...

  2. Minnesota Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Kloos, Eric

    This final report describes activities and accomplishments of the 3-year federally supported Minnesota Deaf-Blind Technical Assistance Project. The project provided training and technical assistance, information sharing, and support services to families of children with deaf-blindness. Activities and accomplishments included: collaboration with…

  3. Final-Year Projects as a Major Element in the IE Curriculum

    ERIC Educational Resources Information Center

    Vitner, G.; Rozenes, S.

    2009-01-01

    This paper presents a multi-perspective view of the final-year project of an industrial engineering and management (IEM) department. The final year project is a major element of a 4-year curriculum within any engineering discipline. Such a project gives the student an opportunity to use and implement methods, techniques and tools that he or she…

  4. Evaluation of the Corridor Safety Improvement Program : phase 1 final report.

    DOT National Transportation Integrated Search

    1997-09-01

    This project is an analysis of Oregon's Corridor Safety Improvement Programs implemented on Oregon Route 22 and Oregon Route 34. Improvements were : made along each corridor in 1993. : The project used a mail-out survey to determine the level of awar...

  5. Increasing Prediction the Original Final Year Project of Student Using Genetic Algorithm

    NASA Astrophysics Data System (ADS)

    Saragih, Rijois Iboy Erwin; Turnip, Mardi; Sitanggang, Delima; Aritonang, Mendarissan; Harianja, Eva

    2018-04-01

    Final year project is very important forgraduation study of a student. Unfortunately, many students are not seriouslydidtheir final projects. Many of studentsask for someone to do it for them. In this paper, an application of genetic algorithms to predict the original final year project of a studentis proposed. In the simulation, the data of the final project for the last 5 years is collected. The genetic algorithm has several operators namely population, selection, crossover, and mutation. The result suggest that genetic algorithm can do better prediction than other comparable model. Experimental results of predicting showed that 70% was more accurate than the previous researched.

  6. The Projected Impacts to Clark County and Local Governmental Public Safety Agencies Resulting from the Transportation of High-Level Nuclear Waste to Yucca Mountain

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mushkatel, A.H.; Conway, S.; Navis, I.

    2006-07-01

    This paper focuses on the difficulties of projecting fiscal impacts to public safety agencies from the proposed high-level nuclear waste repository at Yucca Mountain, Nevada. The efforts made by Clark County Nevada, to develop a fiscal model of impacts for public safety agencies are described in this paper. Some of the difficulties in constructing a fiscal model of impacts for the entire 24 year high-level nuclear waste transportation shipping campaign are identified, and a refined methodology is provided to accomplish this task. Finally, a comparison of the fiscal impact projections for public safety agencies that Clark County developed in 2001,more » with those done in 2005 is discussed, and the fiscal impact cost projections for the entire 24 year transportation campaign are provided. (authors)« less

  7. Hiilangaay Hydroelectric ProjectFinal Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Twitchell, Sara; Stimac, Michael; Lang, Lisa

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less

  8. THe Case Method of Instruction (CMI) Project. Final Report.

    ERIC Educational Resources Information Center

    McWilliam, P. J.; And Others

    This final report describes the Case Method of Instruction (CMI) Project, a project to develop, field test, and disseminate training materials to facilitate the use of the Case Method of Instruction by inservice and preservice instructors in developmental disabilities. CMI project activities focused on developing a collection of case stories and…

  9. 77 FR 25080 - Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ...-AA00 Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR AGENCY: Coast Guard, DHS... trestles and construction cranes involved in the construction of the TriMet Bridge on the Willamette River... project. These safety zones replace the prior safety zones established for the TriMet Bridge construction...

  10. LYNX community advocacy & service engagement (CASE) project final report.

    DOT National Transportation Integrated Search

    2009-05-14

    This report is a final assessment of the Community Advocacy & Service Engagement (CASE) project, a LYNX-FTA research project designed : to study transit education and public engagement methods in Central Florida. In the Orlando area, as in other part...

  11. A root cause analysis project in a medication safety course.

    PubMed

    Schafer, Jason J

    2012-08-10

    To develop, implement, and evaluate team-based root cause analysis projects as part of a required medication safety course for second-year pharmacy students. Lectures, in-class activities, and out-of-class reading assignments were used to develop students' medication safety skills and introduce them to the culture of medication safety. Students applied these skills within teams by evaluating cases of medication errors using root cause analyses. Teams also developed error prevention strategies and formally presented their findings. Student performance was assessed using a medication errors evaluation rubric. Of the 211 students who completed the course, the majority performed well on root cause analysis assignments and rated them favorably on course evaluations. Medication error evaluation and prevention was successfully introduced in a medication safety course using team-based root cause analysis projects.

  12. Implementation of Polyurea Applications for Wastewater System Corrosion-Mitigation Projects: Final Report on Project F15-AR04

    DTIC Science & Technology

    2017-07-24

    Corrosion-Mitigation Projects Final Report on Project F15-AR04 Co ns tr uc tio n En gi ne er in g R es ea rc h La bo ra to ry Clint A. Wilson...2017 Implementation of Polyurea Applications for Wastewater System Corrosion-Mitigation Projects Final Report on Project F15-AR04 Clint A...Secretary of Defense Washington, DC 20301-3090 Under Project F15-AR04, “Polyurea Coating for Rehabilitation of Concrete and Metal Infrastructure

  13. Trends in drinking-driving at night : a comparison of the first five roadside surveys of the Fairfax Alcohol Safety Action Project : final report.

    DOT National Transportation Integrated Search

    1976-01-01

    This report outlines the findings of the first five annual roadside surveys conducted in conjunction with the Fairfax Alcohol Safety Action Project (ASAP). The baseline survey was conducted in January of 1972 with the four subsequent surveys being co...

  14. Admiralty Inlet Pilot Tidal Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around themore » world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.« less

  15. Compendium of traffic safety research projects : 1987-1997

    DOT National Transportation Integrated Search

    1997-09-01

    The National Highway Traffic Safety Administration's (NHTSA) Research and Evaluation Division, Office of Research and Traffic Records, conducts research and evaluation projects dealing with human attitudes, behaviors, and failures (motor vehicle cras...

  16. Advanced Crash Avoidance Technologies (ACAT) Program - Final Report of the Volvo-Ford-UMTRI Project: Safety Impact Methodology for Lane Departure Warning - Method Development and Estimation of Benefits

    DOT National Transportation Integrated Search

    2010-10-01

    The Volvo-Ford-UMTRI project: Safety Impact Methodology (SIM) for Lane Departure Warning is part of the U.S. Department of Transportation's Advanced Crash Avoidance Technologies (ACAT) program. The project developed a basic analytical framework for e...

  17. Almost certain escape from black holes in final state projection models.

    PubMed

    Lloyd, Seth

    2006-02-17

    Recent models of the black-hole final state suggest that quantum information can escape from a black hole by a process akin to teleportation. These models rely on a controversial process called final-state projection. This Letter discusses the self-consistency of the final-state projection hypothesis and investigates escape from black holes for arbitrary final states and for generic interactions between matter and Hawking radiation. Quantum information escapes with fidelity approximately = (8/3pi)2: only half a bit of quantum information is lost on average, independent of the number of bits that escape from the hole.

  18. Engaging Agribusinesses: Feasibility and Cost of an ATV Safety Poster Project.

    PubMed

    Jennissen, Charles A; Sweat, Shane; Wetjen, Kristel; Hoogerwerf, Pam; Denning, Gerene M

    2017-01-01

    All-terrain vehicle (ATV)-related deaths and injuries continue to be a significant problem. Influential change agents such as agribusinesses could be important partners for improving safety behaviors among rural ATV users. Our objective was to determine how effectively an injury prevention project could engage agribusinesses through the postal service and to assess their willingness to display a safety poster. One thousand two hundred forty-four agribusinesses received an ATV safety poster and a postcard survey by mail. A randomized sampling of these businesses was surveyed by telephone 4-7 weeks later. Telephone survey questions included whether they recalled receiving the poster, and if so, whether, where and how long the poster was displayed. One hundred six postcards were returned. Of the 192 eligible business persons contacted by telephone, 89% agreed to participate. Approximately one-third of telephone survey participants recalled receiving the poster. Among these, 81% with walk-in customers posted it, and 74% still had it displayed 1 month later. Of participants who did not recall receiving the poster, 83% stated they would have displayed the poster. The cost of displaying each poster in a business was 16.6 cents/day during the first month. Final costs/day would be much less because of continued display. A high percentage of agribusinesses displayed or would have displayed an ATV safety poster, and most displayed it beyond 1 month. Unfortunately, participant recruitment via postal delivery alone was challenging. Nevertheless, mass mailing of injury prevention materials to be displayed in the retail setting may be a low cost method for raising safety awareness.

  19. Arizona Deafblind Project, 1995-1999. Final Report.

    ERIC Educational Resources Information Center

    Arizona State School for the Deaf and Blind, Tucson.

    This final report describes accomplishments of the four-year federally funded Arizona Deafblind Project which attempted to: (1) identify all deafblind children in Arizona; (2) deliver technical assistance to families; (3) deliver technical assistance to service providers; and (4) enhance community oversight, coordination, and collaboration with…

  20. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, Stephanie Lee

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  1. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, S. L.

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  2. Nabisco Foods Division--"New Indy" Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Ivy Tech State Coll., Indianapolis, IN.

    This document contains a final report, evaluation, and curriculum materials from a project conducted at the RJR Nabisco plant in Indianapolis to upgrade the literacy and numeracy skills of the workers to facilitate technological changes to production lines. As the final report explains, although the goal of the project was to recruit and test 150…

  3. Special Education Evaluation Project for University Affiliated Facilities. Final Report.

    ERIC Educational Resources Information Center

    Burrello, Leonard C.; And Others

    The final report of the Special Education Evaluation Project for 16 University Affiliated Facilities (UAF) centers provides a chronological review of the project which focused on the training of persons to work with mentally retarded or other handicapped individuals. Outlined are project objectives including the development of descriptors useful…

  4. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    PubMed

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  5. Medicare and Medicaid programs; fire safety requirements for certain health care facilities. Final rule.

    PubMed

    2003-01-10

    This final rule amends the fire safety standards for hospitals, long-term care facilities, intermediate care facilities for the mentally retarded, ambulatory surgery centers, hospices that provide inpatient services, religious nonmedical health care institutions, critical access hospitals, and Programs of All-Inclusive Care for the Elderly facilities. Further, this final rule adopts the 2000 edition of the Life Safety Code and eliminates references in our regulations to all earlier editions.

  6. Klickitat Cogeneration Project : Final Environmental Assessment.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2)more » impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).« less

  7. Aviation Safety Program: Weather Accident Prevention (WxAP) Project Overview and Status

    NASA Technical Reports Server (NTRS)

    Nadell, Shari-Beth

    2003-01-01

    This paper presents a project overview and status for the Weather Accident Prevention (WxAP) aviation safety program. The topics include: 1) Weather Accident Prevention Project Background/History; 2) Project Modifications; 3) Project Accomplishments; and 4) Project's Next Steps.

  8. The Development of a Vocational Safety Guide for Missouri's Practitioners. Final Report.

    ERIC Educational Resources Information Center

    Dyrenfurth, Michael; Linhardt, Richard

    A project was conducted to develop a comprehensive vocational education safety guide for local administrators and teachers. To generate the guide, the following steps were completed: (1) a review of key related research, literature, and federal and state legislation, including vocational safety guides from 18 states; reference material from the…

  9. Evaluation of the Rural Math Excel Partnership Project Final Report

    ERIC Educational Resources Information Center

    Nagle, Katherine; Pratt-Williams, Jaunelle; Schmidt, Rebecca; Swantek, Cara; Lyulchenko, Marianna; McGhee, Raymond

    2016-01-01

    This is the final external evaluation report prepared by SRI International for the Rural Math Excel Partnership (RMEP) project, an investing in innovation (i3) development project funded by the U.S. Department of Education. Operated by Virginia Advanced Study Strategies, Inc. (VASS), the RMEP project included six rural school districts (LEAs) in…

  10. Science and Engineering Technician Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Mowery, Donald R.; Wolf, Lawrence J.

    Project SET (Science and Engineering for Technicians) developed a series of study guides designed to teach generic science and engineering skills to students interested in becoming technicians. An entire 2-year curriculum is encompassed by these guides, geared for 2-year college students. Described in this final report are the project's rationale,…

  11. Medicare and Medicaid Programs; Fire Safety Requirements for Certain Health Care Facilities. Final rule.

    PubMed

    2016-05-04

    This final rule will amend the fire safety standards for Medicare and Medicaid participating hospitals, critical access hospitals (CAHs), long-term care facilities, intermediate care facilities for individuals with intellectual disabilities (ICF-IID), ambulatory surgery centers (ASCs), hospices which provide inpatient services, religious non-medical health care institutions (RNHCIs), and programs of all-inclusive care for the elderly (PACE) facilities. Further, this final rule will adopt the 2012 edition of the Life Safety Code (LSC) and eliminate references in our regulations to all earlier editions of the Life Safety Code. It will also adopt the 2012 edition of the Health Care Facilities Code, with some exceptions.

  12. An assessment of traffic safety culture related to engagement in efforts to improve traffic safety : final report.

    DOT National Transportation Integrated Search

    2016-12-01

    This final report summarizes the methods, results, conclusions, and recommendations derived from a survey conducted to understand values, beliefs, and attitudes regarding engagement in behaviors that impact the traffic safety of others. Results of th...

  13. 75 FR 5511 - Safety Zone; AICW Closure Safety Zone for Ben Sawyer Bridge Replacement Project, Sullivan's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ...-AA00 Safety Zone; AICW Closure Safety Zone for Ben Sawyer Bridge Replacement Project, Sullivan's Island... replacement of the old and new approach spans of the Ben Sawyer Swing Bridge. This regulation is necessary to... proposed rulemaking (NPRM) with respect to this rule because hazards associated with the bridge replacement...

  14. HUMAN DEVELOPMENT PROJECT, 1965-1966. FINAL REPORT.

    ERIC Educational Resources Information Center

    Richmond Public Schools, VA.

    THIS FINAL REPORT IS AN EVALUATION OF A COMPENSATORY EDUCATION PROJECT IN RICHMOND, VIRGINIA. DATA ARE DERIVED FROM TEACHERS' RESPONSES TO A QUESTIONNAIRE, FROM A REPORT ON THE ACADEMIC PERFORMANCE OF PUPILS IN THE 1965 SUMMER PROGRAM, AND FROM AN ANALYSIS OF STANDARDIZED ACHIEVEMENT TEST RESULTS IN EXPERIMENTAL AND CONTROL SCHOOLS. THE REPORT…

  15. Miami regional advanced traveler information system project : final evaluation report

    DOT National Transportation Integrated Search

    2002-04-01

    In 1999 the U.S. Congress earmarked funds for selected projects that were assessed as supporting the improvements of transportation efficiency, promoting safety, increasing traffic flow, reducing emissions, improving traveler information, enhancing a...

  16. Legacy sample disposition project. Volume 2: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gurley, R.N.; Shifty, K.L.

    1998-02-01

    This report describes the legacy sample disposition project at the Idaho Engineering and Environmental Laboratory (INEEL), which assessed Site-wide facilities/areas to locate legacy samples and owner organizations and then characterized and dispositioned these samples. This project resulted from an Idaho Department of Environmental Quality inspection of selected areas of the INEEL in January 1996, which identified some samples at the Test Reactor Area and Idaho Chemical Processing Plant that had not been characterized and dispositioned according to Resource Conservation and Recovery Act (RCRA) requirements. The objective of the project was to manage legacy samples in accordance with all applicable environmentalmore » and safety requirements. A systems engineering approach was used throughout the project, which included collecting the legacy sample information and developing a system for amending and retrieving the information. All legacy samples were dispositioned by the end of 1997. Closure of the legacy sample issue was achieved through these actions.« less

  17. Evaluation of US 119 Pine Mountain safety improvements : final report.

    DOT National Transportation Integrated Search

    2007-09-01

    The Transportation Center at the University of Kentucky was requested to perform an evaluation of the safety improvement project over a 7.1-mile section of US 119 on t he Whitesburg side of Pine Mountain in Letcher County to determine whether the typ...

  18. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanson, David

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  19. The 2007 Projected Impacts to Clark County and Local Government Public Safety Agencies Resulting from the Transportation of High- Level Nuclear Waste to Yucca Mountain

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mushkatel, A.H.; Conway, P.H.D.S.; Navis, I.

    2008-07-01

    This paper focuses on projecting fiscal impacts to public safety agencies from the proposed high-level nuclear waste repository at Yucca Mountain, Nevada. The efforts made by Clark County Nevada, to develop a fiscal model of impacts for public safety agencies are described in this paper. In addition, the scenarios used in the study are discussed, as well as a discussion of the plume models provided for each community's scenario that result from the efforts of the National Atmospheric Release Advisory Center (NARAC). Some of the difficulties in constructing a fiscal model of impacts for the entire 24 year high-level nuclearmore » waste transportation shipping campaign are identified, and a refined methodology is provided to accomplish this task. Finally, a comparison of the fiscal impact projections for public safety agencies that Clark County developed in 2001, 2005 are discussed, and the fiscal impact cost projections for the entire 24 year transportation campaign are provided. (authors)« less

  20. 75 FR 38754 - Safety Zone; IJSBA World Finals; Lower Colorado River, Lake Havasu, AZ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ...-AA00 Safety Zone; IJSBA World Finals; Lower Colorado River, Lake Havasu, AZ AGENCY: Coast Guard, DHS... navigable waters of Lake Havasu on the lower Colorado River in support of the IJSBA World Finals. This... International Jet Sports Boating Association is sponsoring the IJSBA World Finals. The event will consist of 300...

  1. Project Developmental Continuity Evaluation: Final Report. Appendices to Volume I.

    ERIC Educational Resources Information Center

    Bond, James T.; And Others

    This document provides the appendices for volume 1 of the final evaluation report of Project Developmental Continuity (PDC), a Head Start demonstration project initiated in 1974 to develop program models which enhance children's social competence by fostering developmental continuity from preschool through the early elementary grades.…

  2. Project LEEDS: Leadership Education To Empower Disabled Students. Final Report.

    ERIC Educational Resources Information Center

    Aune, Betty; And Others

    This final report describes the activities of Project LEEDS (Leadership Education to Empower Disabled Students), a federally supported project designed to create student/staff teams from colleges and universities to encourage undergraduate/graduate students with disabilities to become leaders, through development of self-identity and identity with…

  3. Services for Children with Deaf-Blindness Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Stremel, Kathleen

    This final report describes a pilot project, "Quality Service Provision for Infants and Young Children with Deaf-Blindness: A Mechanism for State Intervention Teams," developed and implemented at the University of Southern Mississippi. The project developed a model of an intervention team that provides intensive training and technical…

  4. Selection and Validation of Model Early Childhood Projects: Final Report.

    ERIC Educational Resources Information Center

    Stock, John R.; And Others

    Presented is the final report of a research program to select and describe outstanding Handicapped Children's Early Education Program (HCEEP) projects. Projects were analyzed in terms of 14 components of an HCEEP program (such as screening, programing, and inservice training). A detailed discussion of model selection and validation is appendixed.)…

  5. The Choctaw Home-Centered Family Education Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Quigley, Patrick A.; And Others

    The final report of the four-year (1972-1976) Choctaw Family Education Project identifies the major goal, "to demonstrate a workable early childhood model for rural reservation groups," and consists of an executive summary, a comprehensive report, and a personalized report. Objectives of the project, carried out in 6 Choctaw reservation…

  6. Plutonium Finishing Plant (PFP) Final Safety Analysis Report (FSAR) [SEC 1 THRU 11

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ULLAH, M K

    2001-02-26

    The Plutonium Finishing Plant (PFP) is located on the US Department of Energy (DOE) Hanford Site in south central Washington State. The DOE Richland Operations (DOE-RL) Project Hanford Management Contract (PHMC) is with Fluor Hanford Inc. (FH). Westinghouse Safety Management Systems (WSMS) provides management support to the PFP facility. Since 1991, the mission of the PFP has changed from plutonium material processing to preparation for decontamination and decommissioning (D and D). The PFP is in transition between its previous mission and the proposed D and D mission. The objective of the transition is to place the facility into a stablemore » state for long-term storage of plutonium materials before final disposition of the facility. Accordingly, this update of the Final Safety Analysis Report (FSAR) reflects the current status of the buildings, equipment, and operations during this transition. The primary product of the PFP was plutonium metal in the form of 2.2-kg, cylindrical ingots called buttoms. Plutonium nitrate was one of several chemical compounds containing plutonium that were produced as an intermediate processing product. Plutonium recovery was performed at the Plutonium Reclamation Facility (PRF) and plutonium conversion (from a nitrate form to a metal form) was performed at the Remote Mechanical C (RMC) Line as the primary processes. Plutonium oxide was also produced at the Remote Mechanical A (RMA) Line. Plutonium processed at the PFP contained both weapons-grade and fuels-grade plutonium materials. The capability existed to process both weapons-grade and fuels-grade material through the PRF and only weapons-grade material through the RMC Line although fuels-grade material was processed through the line before 1984. Amounts of these materials exist in storage throughout the facility in various residual forms left from previous years of operations.« less

  7. Highway safety data : costs, quality, and strategies for improvement, final report.

    DOT National Transportation Integrated Search

    1998-01-01

    The goal of this project was to analyze the collection and management of highway safety data by identifying issues and costs, and proposing means of resolving those issues and reducing the costs. Initial emphasis addressed known elements of the highw...

  8. Hazardous material transportation safety and security field operational test final detailed test plans : executive summary

    DOT National Transportation Integrated Search

    2003-09-16

    The objective of this Hazardous Material (HazMat) Transportation Safety and Security Field Operational Test (FOT) Final Detailed Test Plans evaluation is to measure the impact of technology solutions on the safety, security, and operational efficienc...

  9. Good practices : incorporating safety into resurfacing and restoration projects

    DOT National Transportation Integrated Search

    2006-12-01

    Integrating safety improvements into resurfacing and restoration projects is a subject of long-standing interest by Federal, State, and local transportation agencies. A Scan Tour was conducted to identify and subsequently observe good practices in th...

  10. Riverside County transit : ITS demonstration project : phase II evaluation final report

    DOT National Transportation Integrated Search

    2001-12-24

    In 1999, the U.S. Congress earmarked funds for selected projects that were assessed as supporting improvements in transportation efficiency, promoting safety, increasing traffic flow, reducing emissions, improving traveler information, enhancing alte...

  11. KSC History Project

    NASA Technical Reports Server (NTRS)

    Snaples, Lee

    2001-01-01

    The project is a joint endeavor between Dr. Henry Dethloff and myself and is producing a number of products related to KSC history. This report is a summary of those projects. First, there is an overview monograph covering KSC history. Second, there is a chapter outline for an eventual book-length history. Third, there is monograph on safety at KSC. Finally, there is a web page and database dedicated to the KSC oral history project.

  12. 75 FR 70670 - Final Vehicle Safety Rulemaking and Research Priority Plan 2010-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... management tool as well as a means to communicate to the public NHTSA's highest priorities to meet the Nation's motor vehicle safety challenges. Among them are programs and projects involving rollover crashes... in this plan. This plan lists the programs and projects the agency anticipates working on even though...

  13. Safety and operational performance evaluation of four types of exit ramps on Florida's freeways (final report).

    DOT National Transportation Integrated Search

    2010-12-01

    This project mainly focuses on exit ramp performance analysis of safety and operations. In addition, issues of advance guide sign for exit ramp are also mentioned. : Safety analysis evaluates safety performances of different exit ramps used in Florid...

  14. Innovative tools and techniques in identifying highway safety improvement projects : technical report.

    DOT National Transportation Integrated Search

    2017-08-01

    The Highway Safety Improvement Program (HSIP) aims to achieve a reduction in the number and severity of fatalities and serious injury crashes on all public roads by implementing highway safety improvement projects. Although the structure and main com...

  15. Using Insider Research in MEd Final Projects to Bridge the Theory/Practice Gap

    ERIC Educational Resources Information Center

    Arar, Khalid

    2018-01-01

    This paper aims to identify key issues involved in MEd final project supervision and to highlight the potential of supervision from an academic institution to change educational reality through the postgraduate student-teachers' work-based final project as insider researchers in Israeli schools. It draws on analysis of case-study data from two…

  16. 76 FR 38134 - Final Priorities; Disability and Rehabilitation Research Projects and Centers Program-Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ...-identified research designs to generate reliable and valid findings. Changes: None. Final Priorities Priority... DEPARTMENT OF EDUCATION Final Priorities; Disability and Rehabilitation Research Projects and Centers Program--Disability Rehabilitation Research Projects, etc. AGENCY: Office of Special Education and...

  17. Georgia Deaf-Blind Project. Final Report, 1992-1995. State and Multi-State Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of the Georgia Deaf-Blind Project, a 3-year federally supported project encompassing 159 counties and providing technical assistance to 237 infants, children, and youth with deaf-blindness along with their families and their service providers. Project accomplishments included: (1) more…

  18. Final Report: Fire Prevention, Detection, and Suppression Project, Exploration Technology Development Program

    NASA Technical Reports Server (NTRS)

    Ruff, Gary A.

    2011-01-01

    The Fire Prevention, Detection, and Suppression (FPDS) project is a technology development effort within the Exploration Technology Development Program of the Exploration System Missions Directorate (ESMD) that addresses all aspects of fire safety aboard manned exploration systems. The overarching goal for work in the FPDS area is to develop technologies that will ensure crew health and safety on exploration missions by reducing the likelihood of a fire, or, if one does occur, minimizing the risk to the crew, mission, or system. This is accomplished by addressing the areas of (1) fire prevention and material flammability, (2) fire signatures and detection, and (3) fire suppression and response. This report describes the outcomes of this project from the formation of the Exploration Technology Development Program (ETDP) in October 2005 to September 31, 2010 when the Exploration Technology Development Program was replaced by the Enabling Technology Development and Demonstration Program. NASA s fire safety work will continue under this new program and will build upon the accomplishments described herein.

  19. Proving autonomous vehicle and advanced driver assistance systems safety : final research report.

    DOT National Transportation Integrated Search

    2016-02-15

    The main objective of this project was to provide technology for answering : crucial safety and correctness questions about verification of autonomous : vehicle and advanced driver assistance systems based on logic. : In synergistic activities, we ha...

  20. Final-Year Education Projects for Undergraduate Chemistry Students

    ERIC Educational Resources Information Center

    Page, Elizabeth

    2011-01-01

    The Undergraduate Ambassadors Scheme provides an opportunity for students in their final year of the chemistry degree course at the University of Reading to choose an educational project as an alternative to practical research. The undergraduates work in schools where they can be regarded as role models and offer one way of inspiring pupils to…

  1. 75 FR 59078 - Safety Zone; Ledge Removal Project, Bass Harbor, ME

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2010-0806] RIN 1625-AA00 Safety Zone; Ledge Removal Project, Bass Harbor, ME AGENCY: Coast Guard, DHS. ACTION: Temporary... District USACE Web site: http://www.nae.usace.army.mil/projects/me/bassharbor/bassharbor.htm . No...

  2. Warrants, design, and safety of road ranger service patrols : draft final report.

    DOT National Transportation Integrated Search

    2016-11-01

    This research project created a decision support system for managers who must decide if a roadway warrants the addition of the Safety Service Patrol (SSP). Meetings with Florida Department of Transportation (FDOT) service patrol program manager...

  3. The SISIFO project: Seismic Safety at High Schools

    NASA Astrophysics Data System (ADS)

    Peruzza, Laura; Barnaba, Carla; Bragato, Pier Luigi; Dusi, Alberto; Grimaz, Stefano; Malisan, Petra; Saraò, Angela; Mucciarelli, Marco

    2014-05-01

    For many years, the Italian scientific community has faced the problem of the reduction of earthquake risk using innovative educational techniques. Recent earthquakes in Italy and around the world have clearly demonstrated that seismic codes alone are not able to guarantee an effective mitigation of risk. After the tragic events of San Giuliano di Puglia (2002), where an earthquake killed 26 school children, special attention was paid in Italy to the seismic safety of schools, but mainly with respect to structural aspects. Little attention has been devoted to the possible and even significant damage to non-structural elements (collapse of ceilings, tipping of cabinets and shelving, obstruction of escape routes, etc..). Students and teachers trained on these aspects may lead to a very effective preventive vigilance. Since 2002, the project EDURISK (www.edurisk.it) proposed educational tools and training programs for schools, at primary and middle levels. More recently, a nationwide campaign aimed to adults (www.iononrischio.it) was launched with the extensive support of civil protection volounteers. There was a gap for high schools, and Project SISIFO was designed to fill this void and in particular for those schools with technical/scientific curricula. SISIFO (https://sites.google.com/site/ogssisifo/) is a multidisciplinary initiative, aimed at the diffusion of scientific culture for achieving seismic safety in schools, replicable and can be structured in training the next several years. The students, helped by their teachers and by experts from scientific institutions, followed a course on specialized training on earthquake safety. The trial began in North-East Italy, with a combination of hands-on activities for the measurement of earthquakes with low-cost instruments and lectures with experts in various disciplines, accompanied by specifically designed teaching materials, both on paper and digital format. We intend to raise teachers and students knowledge of the

  4. Patterns of patient safety culture: a complexity and arts-informed project of knowledge translation.

    PubMed

    Mitchell, Gail J; Tregunno, Deborah; Gray, Julia; Ginsberg, Liane

    2011-01-01

    The purpose of this paper is to describe patterns of patient safety culture that emerged from an innovative collaboration among health services researchers and fine arts colleagues. The group engaged in an arts-informed knowledge translation project to produce a dramatic expression of patient safety culture research for inclusion in a symposium. Scholars have called for a deeper understanding of the complex interrelationships among structure, process and outcomes relating to patient safety. Four patterns of patient safety culture--blinding familiarity, unyielding determination, illusion of control and dismissive urgency--are described with respect to how they informed creation of an arts-informed project for knowledge translation.

  5. Working together to ensure safety at hydro projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartel, J.W.

    Providing for public safety around a hydroelectric facility can be critically important to the welfare of a hydro-power producer. With this in mind, Wisconsin Electric Power Company and Wisconsin Public Service Corporation have worked together to develop consistent safety signage and several for their hydro projects. Although the two utilities sometimes compete for electric customers, they cooperate to ensure the safety to those customers. Both WE and WPS took steps in 1986 to make their operations safer through involvement in the Wisconsin/Michigan Hydro User Group. The organization has 25 members-primarily of electric utilities and paper companies-who operate hydro facilities inmore » the two states. The two areas that the HUG studied in public safety were signs and warning systems. HUG established a sign committee to study how to increase safety of people around hydro plants through signs, explained Ted Handrick, hydro plant superintendent at WPS. The committee's recommendations led to development of a statewide uniform sign system adopted by all HUG members. The committee used Wisconsin Department of Natural Resources' guidelines for warning signs and portages in developing the signage standards. HUG members are converting to these new sign standards as they replace old signs and/or install new signs. Notices describing the new signage system have been placed near each hydro plant, at boat landings, and in campgrounds. The signs are mounted well above ground level so they can be seen and easily read by recreationalists. Warning systems, in accordance with HUG warning standards, were installed at WE and WPS hydro facilities. These systems alert nearby recreational users of rapid increases in water flow when generating units are turned on or when spillway gates are opened. Soon after the authors installed equipment to remotely operate its hydro facilities, the utility experienced a dramatic increase increase in intrusion on dams and other structures at the

  6. Compendium of Traffic Safety Research Projects: 1985-1995 and Beyond

    DOT National Transportation Integrated Search

    1996-03-01

    The National Highway Traffic Safety Administration's Office of Program : Development and Evaluation (OPDE) conducts research and evaluation projects : dealing with human attitudes, behaviors and failures (motor vehicle crashes). : OPDE's focus is on ...

  7. The Early Childhood Interactive Technology Literacy Curriculum Project: A Final Report.

    ERIC Educational Resources Information Center

    Hutinger, Patricia; Robinsosn, Linda; Schneider, Carol; Johanson, Joyce

    This final report describes the activities and outcomes of the Interactive Technology Literacy Curriculum (ITLC) project. This federally funded 5-year model demonstration project was designed to advance the availability, quality, use and effectiveness of computer technology in addressing the acquisition of emergent literacy among young children…

  8. FINAL SAFETY ANALYSIS REPORT--SNAP 1A RADIOISOTOPE FUELED THERMOELECTRIC GENERATOR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dix, G.P.

    1960-06-30

    The safety aspects involved in utilizing the Task 2 radioisotope-powered thermoelectric generator in a terrestrial satellite are described. It is based upon a generalized satellite mission having a 600-day orbital lifetime. A description of the basic design of the generator is presented in order to establish the analytical model. This includes the generator design, radiocerium fuel properties, and the fuel core. The transport of the generator to the launch site is examined, including the shipping cask, shipping procedures, and shipping hazards. A description of ground handling and vehicle integration is presented including preparation for fuel transfer, transfer, mating of generatorsmore » to final stage, mating final stage to booster, and auxiliary support equipment. The flight vehicle is presented to complete the analytical model. Contained in this chapter are descriptions of the booster-sustainer, final stage, propellants, and built-in safety systems. The typical missile range is examined with respect to the launch complex and range safety characteristics. The shielding of the fuel is discussed and includes both dose rates and shield thicknesses required. The bare core, shielded generator, fuel transfer operation and dose rates for accidental conditions are treated. mechanism of re-entry from the successful mission is covered. Radiocerium inventories with respect to time and the chronology of re-entry are specifically treated. The multiplicity of conditions for aborted missions is set forth. The definition of aborted missions is treated first in order to present the initial conditions. Following this, a definition of the forces imposed upon the generator is presented. The aborted missions is presented. A large number of initial vehicle failure cases is narrowed down into categories of consequences. Since stratospheric injection of fuel results in cases where the fuel is not contained after re-entry, an extensive discussion of the fall-out mechanism is

  9. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  10. Framework for selection and evaluation of bicycle and pedestrian safety projects in Virginia.

    DOT National Transportation Integrated Search

    2008-01-01

    The Virginia Department of Transportation's (VDOT) Bicycle and Pedestrian Safety (BPS) Program provides funds for implementing short-term, low-cost bicycle and pedestrian safety projects in Virginia. This initiative is administered by evaluating each...

  11. Reducing school bus/light-vehicle conflicts through connected vehicle communications : final report.

    DOT National Transportation Integrated Search

    2016-09-15

    This project aimed to develop and test a concept for improving the safety of school bus transportation using connected vehicle technology. The project consisted of three key steps that led to a final road study: 1) conducting focus groups with light ...

  12. An analysis of problem drinker diagnosis and referral within the Fairfax Alcohol Safety Action Project, 1972.

    DOT National Transportation Integrated Search

    1974-01-01

    This report is one of a series developed in conformance with annual reporting requirements contained within Alcohol Safety Action Projects: Evaluation. In February 1972, operations of the Fairfax Alcohol Safety Action Project began and these federall...

  13. Clinical Trial Electronic Portals for Expedited Safety Reporting: Recommendations from the Clinical Trials Transformation Initiative Investigational New Drug Safety Advancement Project.

    PubMed

    Perez, Raymond P; Finnigan, Shanda; Patel, Krupa; Whitney, Shanell; Forrest, Annemarie

    2016-12-15

    Use of electronic clinical trial portals has increased in recent years to assist with sponsor-investigator communication, safety reporting, and clinical trial management. Electronic portals can help reduce time and costs associated with processing paperwork and add security measures; however, there is a lack of information on clinical trial investigative staff's perceived challenges and benefits of using portals. The Clinical Trials Transformation Initiative (CTTI) sought to (1) identify challenges to investigator receipt and management of investigational new drug (IND) safety reports at oncologic investigative sites and coordinating centers and (2) facilitate adoption of best practices for communicating and managing IND safety reports using electronic portals. CTTI, a public-private partnership to improve the conduct of clinical trials, distributed surveys and conducted interviews in an opinion-gathering effort to record investigator and research staff views on electronic portals in the context of the new safety reporting requirements described in the US Food and Drug Administration's final rule (Code of Federal Regulations Title 21 Section 312). The project focused on receipt, management, and review of safety reports as opposed to the reporting of adverse events. The top challenge investigators and staff identified in using individual sponsor portals was remembering several complex individual passwords to access each site. Also, certain tasks are time-consuming (eg, downloading reports) due to slow sites or difficulties associated with particular operating systems or software. To improve user experiences, respondents suggested that portals function independently of browsers and operating systems, have intuitive interfaces with easy navigation, and incorporate additional features that would allow users to filter, search, and batch safety reports. Results indicate that an ideal system for sharing expedited IND safety information is through a central portal used by

  14. System Safety in Early Manned Space Program: A Case Study of NASA and Project Mercury

    NASA Technical Reports Server (NTRS)

    Hansen, Frederick D.; Pitts, Donald

    2005-01-01

    This case study provides a review of National Aeronautics and Space Administration s (NASA's) involvement in system safety during research and evolution from air breathing to exo-atmospheric capable flight systems culminating in the successful Project Mercury. Although NASA has been philosophically committed to the principals of system safety, this case study points out that budget and manpower constraints-as well as a variety of internal and external pressures can jeopardize even a well-designed system safety program. This study begins with a review of the evolution and early years of NASA's rise as a project lead agency and ends with the lessons learned from Project Mercury.

  15. 78 FR 23489 - Safety Zone; V.I. Carnival Finale, St. Thomas Harbor; St. Thomas, U.S.V.I.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ...-AA00 Safety Zone; V.I. Carnival Finale, St. Thomas Harbor; St. Thomas, U.S.V.I. AGENCY: Coast Guard... waters of St. Thomas Harbor in St. Thomas, U.S. Virgin Islands during the V.I. Carnival Finale, a... being positioned near the St. Thomas Harbor channel from which fireworks will be lit. The safety zone is...

  16. 78 FR 22778 - Safety Zone; Corp. Event Finale UHC, St. Thomas Harbor; St. Thomas, U.S.V.I.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ...-AA00 Safety Zone; Corp. Event Finale UHC, St. Thomas Harbor; St. Thomas, U.S.V.I. AGENCY: Coast Guard... waters of St. Thomas Harbor in St. Thomas, U.S. Virgin Islands during the Corp. Event Finale UHC, a... barge being positioned near the St. Thomas Harbor channel from which fireworks will be lit. The safety...

  17. 77 FR 50916 - Safety Zone; Boston Harbor's Rock Removal Project, Boston Inner Harbor, Boston, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0767] RIN 1625-AA00 Safety Zone; Boston Harbor's Rock Removal Project, Boston Inner Harbor, Boston, MA AGENCY: Coast.... 165.T01-0767 Safety Zone; Boston Harbor's Rock Removal Project, Boston Inner Harbor, Boston, MA. (a...

  18. Projecting effects of improvements in passive safety of the New Zealand light vehicle fleet.

    PubMed

    Keall, Michael; Newstead, Stuart; Jones, Wayne

    2007-09-01

    In the year 2000, as part of the process for setting New Zealand road safety targets, a projection was made for a reduction in social cost of 15.5 percent associated with improvements in crashworthiness, which is a measure of the occupant protection of the light passenger vehicle fleet. Since that document was produced, new estimates of crashworthiness have become available, allowing for a more accurate projection. The objective of this paper is to describe a methodology for projecting changes in casualty rates associated with passive safety features and to apply this methodology to produce a new prediction. The shape of the age distribution of the New Zealand light passenger vehicle fleet was projected to 2010. Projected improvements in crashworthiness and associated reductions in social cost were also modeled based on historical trends. These projections of changes in the vehicle fleet age distribution and of improvements in crashworthiness together provided a basis for estimating the future performance of the fleet in terms of secondary safety. A large social cost reduction of about 22 percent for 2010 compared to the year 2000 was predicted due to the expected huge impact of improvements in passive vehicle features on road trauma in New Zealand. Countries experiencing improvements in their vehicle fleets can also expect significant reductions in road injury compared to a less crashworthy passenger fleet. Such road safety gains can be analyzed using some of the methodology described here.

  19. The LiveWire Project final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, C.D.; Nelson, T.T.; Kelly, J.C.

    Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local areamore » network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.« less

  20. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lear, Jon; Bennett, Carlon; Lear, Dan

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator -more » Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.« less

  1. Pacific Basin Deaf-Blind Project. State & Multi State Projects for Children with Deaf-Blindness. Final Report, 1992-1995.

    ERIC Educational Resources Information Center

    Kelly, Dotty; Guerrero, Vincent Leon

    This final report describes activities and accomplishments of the Pacific Basin Deaf-Blind Project, a 3-year federally funded project to provide technical assistance to public and private agencies, institutions, and organizations providing early intervention, educational, transitional, vocational, early identification, and related services to…

  2. 77 FR 38723 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge located on the... the construction area while transiting in the vicinity of the Sellwood Bridge project; however, the...

  3. 77 FR 14970 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge on the Willamette... construction area while transiting in the vicinity of the Sellwood Bridge project; however, the establishment...

  4. Tom Green County Library Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Vavricka, D. Karen

    The final report of the Tom Green Country Library System (Texas) literacy project details progress toward achievement of 11 objectives. Objectives of the literacy outreach program were to: (1) increase Hispanic enrollment; (2) increase Black enrollment; (3) provide free child care for 4 students to attend 50 tutoring sessions; (4) provide…

  5. Skills Conversion Project: Chapter 2, Executive Summary. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    This final report describes the Skills Conversion Project conducted by The National Society of Professional Engineers under contract to the Department of Labor to study methods of utilizing the large pool of highly skilled unemployed technicians and professional personnel who were formerly employed in the aerospace and defense industries. If…

  6. Final report on the maintenance asset management project : phase II.

    DOT National Transportation Integrated Search

    2013-07-01

    Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some ne...

  7. Bridging the Divide between Safety and Risk Management for your Project or Program

    NASA Technical Reports Server (NTRS)

    Lutomski, Mike

    2005-01-01

    This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.

  8. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  9. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  10. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  11. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  12. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  13. Evaluating safety and operation of high-speed signalized intersections : final report, March 2010.

    DOT National Transportation Integrated Search

    2010-03-01

    This Final Report reviews a research effort to evaluate the safety and operations of high-speed intersections in the State of : Oregon. In particular, this research effort focuses on four-leg, signalized intersections with speed limits of 45 mph or :...

  14. Patient safety competence for final-year health professional students: Perceptions of effectiveness of an interprofessional education course.

    PubMed

    Hwang, Jee-In; Yoon, Tai-Young; Jin, Hyeon-Jeong; Park, Yikyun; Park, Ju-Young; Lee, Beom-Joon

    2016-11-01

    As final-year medical and nursing students will soon play key roles in frontline patient care, their preparedness for safe, reliable care provision is of special importance. We assessed patient safety competencies of final-year health profession students, and the effect of a 1-day patient safety education programme on these competencies. A cross-sectional survey was conducted with 233 students in three colleges of medicine, nursing, and traditional medicine in Seoul. A before-and-after study followed to evaluate the effectiveness of the curriculum. Patient safety competency was measured using the Health-Professional Education for Patients Safety Survey (H-PEPSS) and an objective patient safety knowledge test. The mean scores were 3.4 and 1.7 out of 5.0, respectively. The communication domain was rated the highest and the teamwork domain was rated the lowest. H-PEPSS scores significantly differed between the students from three colleges. The 1-day patient safety education curriculum significantly improved H-PEPSS and knowledge test scores. These results indicated that strengthening patient safety competencies, especially teamwork, of students is required in undergraduate healthcare curricula. A 1-day interprofessional patient safety education programme may be a promising strategy. The findings suggest that interprofessional patient safety education needs to be implemented as a core undergraduate course to improve students' safety competence.

  15. 76 FR 63988 - Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ...-0097] Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits AGENCY: Federal Motor... public comment on data and information concerning the Pre-Authorization Safety Audits (PASAs) for two motor carriers that applied to participate in the Agency's long-haul pilot program to test and...

  16. On the design of learning outcomes for the undergraduate engineer's final year project

    NASA Astrophysics Data System (ADS)

    Thambyah, Ashvin

    2011-03-01

    The course for the final year project for engineering students, because of its strongly research-based, open-ended format, tends to not have well defined learning outcomes, which are also not aligned with any accepted pedagogical philosophy or learning technology. To address this problem, the revised Bloom's taxonomy table of Anderson and Krathwohl (2001) is utilised, as suggested previously by Lee and Lai (2007), to design new learning outcomes for the final year project course in engineering education. Based on the expectations of the engineering graduate, and integrating these graduate expectations into the six cognitive processes and four knowledge dimensions of the taxonomy table, 24 learning outcomes have been designed. It is proposed that these 24 learning outcomes be utilised as a suitable working template to inspire more critical evaluation of what is expected to be learnt by engineering students undertaking final year research or capstone projects.

  17. High/Scope Outreach Project. Final Report. October 1, 1983-September 30, 1984.

    ERIC Educational Resources Information Center

    High/Scope Educational Research Foundation, Ypsilanti, MI.

    The final report reviews accomplishments of an outreach project designed to provide technical assistance and training to early childhood programs for handicapped children. The project features the Cognitively Oriented Preschool Curriculum, a developmental approach based on Piagetian theory and explained to build on the child's accomplishments. A…

  18. Hawaii Demonstration Project to Avert Unintended Teenage Pregnancy: 1978-1982. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Levitt-Merin, Marta; Sutter, Sharon Kingdon

    This final report provides a descriptive overview of three approaches which the Hawaii Demonstration Project initiated to reduce unintended teenage pregnancies. Project evaluation findings are summarized; both qualitative and quantitative data are presented for a comprehensive picture of the project and its input. Project limitations and successes…

  19. Illinois State Project: Services for Children with Deaf-Blindness Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Dorsey, Christine

    This final report describes activities and accomplishments of the Illinois state project on services for children with deaf-blindness, a 3-year federally supported project to address the needs of children (ages birth to 21) who are deaf-blind. Project activities included inservice training and technical assistance, development of a comprehensive…

  20. Final Scientific Report - Wind Powering America State Outreach Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sinclair, Mark; Margolis, Anne

    2012-02-01

    The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America Statemore » Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.« less

  1. The Environmental Health/Home Safety Education Project: a successful and practical U.S.-Mexico border initiative.

    PubMed

    Forster-Cox, Susan C; Mangadu, Thenral; Jacquez, Benjamín; Fullerton, Lynne

    2010-05-01

    The Environmental Health/Home Safety Education Project (Proyecto de Salud Ambiental y Seguridad en el Hogar) has been developed in response to a wide array of severe and often preventable environmental health issues occurring in and around homes on the U.S.-Mexico border. Utilizing well-trained community members, called promotoras , homes are visited and assessed for potential environmental hazards, including home fire and food safety issues. Data analyzed from project years 2002 to 2005 shows a significant impact in knowledge levels and initial behavior change among targeted participants as it relates to fire and food safety issues. Since the initiation of the project in 1999, hundreds of participants have improved their quality of life by making their homes safer. The project has proven to be sustainable, replicable, flexible, and attractive to funders.

  2. Development of Home Health Aide Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Brown, Patricia

    This package contains materials intended for use in a new home health aide curriculum that is designed to be presented as a two-quarter program at Tacoma Community College in Tacoma, Washington. Included in the package are a final report outlining the objectives and outcomes of the project to develop a home health aide curriculum that would meet…

  3. Developing tools for the safety specification in risk management plans: lessons learned from a pilot project.

    PubMed

    Cooper, Andrew J P; Lettis, Sally; Chapman, Charlotte L; Evans, Stephen J W; Waller, Patrick C; Shakir, Saad; Payvandi, Nassrin; Murray, Alison B

    2008-05-01

    Following the adoption of the ICH E2E guideline, risk management plans (RMP) defining the cumulative safety experience and identifying limitations in safety information are now required for marketing authorisation applications (MAA). A collaborative research project was conducted to gain experience with tools for presenting and evaluating data in the safety specification. This paper presents those tools found to be useful and the lessons learned from their use. Archive data from a successful MAA were utilised. Methods were assessed for demonstrating the extent of clinical safety experience, evaluating the sensitivity of the clinical trial data to detect treatment differences and identifying safety signals from adverse event and laboratory data to define the extent of safety knowledge with the drug. The extent of clinical safety experience was demonstrated by plots of patient exposure over time. Adverse event data were presented using dot plots, which display the percentages of patients with the events of interest, the odds ratio, and 95% confidence interval. Power and confidence interval plots were utilised for evaluating the sensitivity of the clinical database to detect treatment differences. Box and whisker plots were used to display laboratory data. This project enabled us to identify new evidence-based methods for presenting and evaluating clinical safety data. These methods represent an advance in the way safety data from clinical trials can be analysed and presented. This project emphasises the importance of early and comprehensive planning of the safety package, including evaluation of the use of epidemiology data.

  4. Faculty College. Final Project Report, July 1, 1976 through June 30, 1978.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Oshkosh.

    The final report of a faculty development project, sponsored by the Fund for the Improvement of Postsecondary Education, is presented. Project objectives were to: augment the existing Faculty College programming with special focus sessions, featuring national leaders who would treat issues in one of the developing areas of the institution; bring…

  5. The arrangement of deformation monitoring project and analysis of monitoring data of a hydropower engineering safety monitoring system

    NASA Astrophysics Data System (ADS)

    Wang, Wanshun; Chen, Zhuo; Li, Xiuwen

    2018-03-01

    The safety monitoring is very important in the operation and management of water resources and hydropower projects. It is the important means to understand the dam running status, to ensure the dam safety, to safeguard people’s life and property security, and to make full use of engineering benefits. This paper introduces the arrangement of engineering safety monitoring system based on the example of a water resource control project. The monitoring results of each monitoring project are analyzed intensively to show the operating status of the monitoring system and to provide useful reference for similar projects.

  6. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume III. Project environmental/health/safety/ and socioeconomic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. This volume contains the results of the environmental, health, safety, and socio-economic studies.« less

  7. KSC History Project

    NASA Technical Reports Server (NTRS)

    Dethloff, Henry C.

    2001-01-01

    The KSC History Project focuses on archival research and oral history interviews on the history of Kennedy Space Center (KSC). Related projects include the preparation of a precis and chapter outline for a proposed book-length narrative history, a bibliography of key primary and secondary resources, a brief monograph overview of the history of KSC, and a monograph on the history of safety at the Center. Finally, there is work on the development of a web page and a personal history data base associated with the oral history project. The KSC History Project has been a joint endeavor between Henry C. Dethloff and Dr. Noble Lee Snaples, Jr.

  8. The Elder Abuse Prevention Project, Phase Two, Three and Four. Final Report.

    ERIC Educational Resources Information Center

    Regina Univ. (Saskatchewan). Univ. Extension. Seniors Education Centre.

    This document presents the final report from an educational and community development program designed to raise awareness about the abuse and neglect of the elderly. The Elder Abuse Prevention Project is briefly described in terms of project goals, objectives, the model used, the target groups served, and the evaluation processes employed. It is…

  9. 76 FR 25278 - Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ...-AA00 Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... safety zone during the construction of the TriMet Bridge on the Willamette River, in Portland, OR. This..., will be starting construction of the new Portland-Milwaukie Light Rail Bridge on July 1, 2011 (with in...

  10. Natural Gas Vehicle Cylinder Safety, Training and Inspection Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hank Seiff

    2008-12-31

    Under the auspices of the National Energy Technology Laboratory and the US Department of Energy, the Clean Vehicle Education Foundation conducted a three-year program to increase the understanding of the safe and proper use and maintenance of vehicular compressed natural gas (CNG) fuel systems. High-pressure fuel systems require periodic inspection and maintenance to insure safe and proper operation. The project addressed the needs of CNG fuel containers (cylinders) and associated high-pressure fuel system components related to existing law, codes and standards (C&S), available training and inspection programs, and assured coordination among vehicle users, public safety officials, fueling station operators andmore » training providers. The program included a public and industry awareness campaign, establishment and administration of a cylinder inspector certification training scholarship program, evaluation of current safety training and testing practices, monitoring and investigation of CNG vehicle incidents, evaluation of a cylinder recertification program and the migration of CNG vehicle safety knowledge to the nascent hydrogen vehicle community.« less

  11. 77 FR 63732 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the Demolition Project on the Cline Avenue Bridge... vessels from the hazards associated with the demolition project on the Cline Avenue bridge, which are...

  12. 77 FR 72957 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... associated with the demolition project on the Cline Avenue bridge, which are discussed further below. Under 5...

  13. 40. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H. GENERAL VIEW OT THE PROJECT SHOWING CONSPICUOUS SCARS. THE BEFORE PHOTO OF A BEFORE AND AFTER SET. AFTER PHOTO IS HI-52-41. - Haleakala National Park Roads, Pukalani, Maui County, HI

  14. West Virginia peer exchange : streamlining highway safety improvement program project delivery.

    DOT National Transportation Integrated Search

    2015-01-01

    The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences : for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September : 22 to 23, 2014 in Charleston, We...

  15. 76 FR 78157 - Safety Zone; Eisenhower Expressway Bridge Rehabilitation Project; Chicago River South Branch...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ...-AA00 Safety Zone; Eisenhower Expressway Bridge Rehabilitation Project; Chicago River South Branch... the Eisenhower Expressway Bridge. This temporary safety zone is necessary to protect the surrounding... Bridge. Entry into this zone is prohibited unless specifically authorized by the Captain of the Port...

  16. 77 FR 67662 - Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... decommission a solar photovoltaic electricity generating facility with a proposed output of 150 megawatts and a... CACA 49491] Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact...) Plan Amendment and Final Environmental Impact Statement (EIS) for the Desert Harvest Solar Project and...

  17. Chronic beryllium disease prevention program; worker safety and health program. Final rule.

    PubMed

    2006-02-09

    The Department of Energy (DOE) is today publishing a final rule to implement the statutory mandate of section 3173 of the Bob Stump National Defense Authorization Act (NDAA) for Fiscal Year 2003 to establish worker safety and health regulations to govern contractor activities at DOE sites. This program codifies and enhances the worker protection program in operation when the NDAA was enacted.

  18. Study of Evaluation OSH Management System Policy Based On Safety Culture Dimensions in Construction Project

    NASA Astrophysics Data System (ADS)

    Latief, Yusuf; Armyn Machfudiyanto, Rossy; Arifuddin, Rosmariani; Mahendra Fira Setiawan, R.; Yogiswara, Yoko

    2017-07-01

    Safety Culture in the construction industry is very influential on the socio economic conditions that resulted in the country’s competitiveness. Based on the data, the accident rate of construction projects in Indonesia is very high. In the era of the Asian Economic Community (AEC) Indonesian contractor is required to improve competitiveness, one of which is the implementation of the project without zero accident. Research using primary and secondary data validated the results of the literature experts and questionnaire respondents were analyzed using methods SmartPLS, obtained pattern of relationships between dimensions of safety culture to improve the performance of Safety. The results showed that the behaviors and Cost of Safety into dimensions that significantly affect the performance of safety. an increase in visible policy-based on Regulation of Public Work and Housing No 5/PRT/M/2014 to improve to lower the accident rate.

  19. Navy Career Education Diffusion Project: State of Oregon. Final Report.

    ERIC Educational Resources Information Center

    McDermott, Michael M.

    The final report describes a project to research, develop, and field test Navy occupational information for inclusion into the Oregon Career Information System (CIS), a computer-assisted career education program. Five sections include: (1) introductory information; (2) a discussion of the preparation of Navy occupational information and reviewing…

  20. SELF (Supports for Early Learning Foundations): A Non-Directed Model Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Harrison, Holly

    This final report describes achievements and activities of Project SELF (Supports for Early Learning Foundations), a federally funded project in New Mexico which developed, evaluated, and replicated an innovative model that provides strategies for early interventionists and families to support early learning foundations. The project identified…

  1. Studies in Bilingual Evaluation, Work Unit I: Bilingual Prediction Project. Final Report.

    ERIC Educational Resources Information Center

    de Porcel, Antonio; And Others

    The final report of the Bilingual Prediction Project presents a review of the project from its inception in 1975 through completion in 1979. The main goal was to predict a student's academic ability in English. A prediction index was constructed in two stages. The first stage was a description of the target population and their school setting, as…

  2. Extending Occupational Health and Safety to Urban Street Vendors: Reflections From a Project in Durban, South Africa.

    PubMed

    Alfers, Laura; Xulu, Phumzile; Dobson, Richard; Hariparsad, Sujatha

    2016-08-01

    This article focuses on an action-research project which is attempting to extend occupational health and safety to a group of street traders in Durban, South Africa, using a variety of different (and sometimes unconventional) institutional actors. The article is written from the perspective of key people who have played a role in conceptualizing and administering the project and is intended to deepen the conversation about what it means to extend occupational health to the informal economy. It explores this question through a reflection on three key project activities: the setting up of a trader-led health and safety committee, an occupational health and safety training course, and a clinical health assessment. It concludes with a discussion of the issues that emerge from the reflections of project participants, which include the need to bring occupational health and urban health into closer conversation with one another, the need to be cognizant of local "informal" politics and the impact that has on occupational health and safety interventions, and the need to create greater opportunities for occupational health and safety professionals to interact with workers in the informal economy. © The Author(s) 2016.

  3. Zachary-Fort Lauderdale pipeline construction and conversion project: final supplement to final environmental impact statement. Docket No. CP74-192

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.

  4. 77 FR 64718 - Safety Zone; Steam Ship Col. James M. Schoonmaker Relocation Project, Maumee River, Toledo, OH

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0939] RIN 1625-AA00 Safety Zone; Steam Ship Col. James M. Schoonmaker Relocation Project, Maumee River, Toledo, OH...-0939 as follows: Sec. 165.T09-0939 Safety Zone; Steam Ship Col. James M. Schoonmaker relocation project...

  5. Palmdale Energy Project; Final Decision; Prevention of Significant Deterioration (PSD) Permit

    EPA Pesticide Factsheets

    EPA Region 9 is issuing a final decision to grant conditional approval, in accordance with the Clean Air Act, for the construction of a natural gas-fired combined cycle power plant known as the Palmdale Energy Project.

  6. 77 FR 65818 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the Demolition Project on the Cline Avenue Bridge... demolition project on the Cline Avenue Bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3...

  7. Environmental Technology (Laboratory Analysis and Environmental Sampling) Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Hinojosa, Oscar V.; Guillen, Alfonso

    A project assessed the need and developed a curriculum for environmental technology (laboratory analysis and environmental sampling) in the emerging high technology centered around environmental safety and health in Texas. Initial data were collected through interviews by telephone and in person and through onsite visits. Additional data was…

  8. The National Program for Occupational Safety and Health in Agriculture. 1992 Project Facts.

    ERIC Educational Resources Information Center

    National Inst. for Occupational Safety and Health (DHHS/PHS), Cincinnati, OH.

    This book contains information about a project instituted in 1990 by the National Institute for Occupational Safety and Health (NIOSH) to prevent work-related diseases and injuries among agricultural workers. Included are facts about 25 projects within NIOSH and 42 cooperative agreements between NIOSH and institutions in 25 states. These…

  9. 76 FR 53054 - Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ...-AA00 Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... the TriMet Bridge on the Willamette River, in Portland, OR. This action is necessary to ensure the... Zone: TriMet Bridge Project, Willamette River; Portland, OR in the Federal Register (76 FR 86). We...

  10. Northeast Oregon Hatchery Project, Final Siting Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and directmore » release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.« less

  11. Analysis of Aviation Safety Reporting System Incident Data Associated With the Technical Challenges of the Vehicle Systems Safety Technology Project

    NASA Technical Reports Server (NTRS)

    Withrow, Colleen A.; Reveley, Mary S.

    2014-01-01

    This analysis was conducted to support the Vehicle Systems Safety Technology (VSST) Project of the Aviation Safety Program (AVsP) milestone VSST4.2.1.01, "Identification of VSST-Related Trends." In particular, this is a review of incident data from the NASA Aviation Safety Reporting System (ASRS). The following three VSST-related technical challenges (TCs) were the focus of the incidents searched in the ASRS database: (1) Vechicle health assurance, (2) Effective crew-system interactions and decisions in all conditions; and (3) Aircraft loss of control prevention, mitigation, and recovery.

  12. Investigational new drug safety reporting requirements for human drug and biological products and safety reporting requirements for bioavailability and bioequivalence studies in humans. Final rule.

    PubMed

    2010-09-29

    The Food and Drug Administration (FDA) is amending its regulations governing safety reporting requirements for human drug and biological products subject to an investigational new drug application (IND). The final rule codifies the agency's expectations for timely review, evaluation, and submission of relevant and useful safety information and implements internationally harmonized definitions and reporting standards. The revisions will improve the utility of IND safety reports, reduce the number of reports that do not contribute in a meaningful way to the developing safety profile of the drug, expedite FDA's review of critical safety information, better protect human subjects enrolled in clinical trials, subject bioavailability and bioequivalence studies to safety reporting requirements, promote a consistent approach to safety reporting internationally, and enable the agency to better protect and promote public health.

  13. 76 FR 12096 - McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Project; Notice of Availability of the Final Environmental Impact Statement for the Mccloud-Pit... Pit Rivers in Shasta County, California and has prepared a final environmental impact statement (EIS... and the alternatives for relicensing the McCloud-Pit Project. The final EIS documents the views of...

  14. Project Target: Criterion-Referenced Physical Fitness Standards for Adolescents with Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Winnick, Joseph P.; Short, Francis X.

    This final report discusses the outcomes of a project designed to extend the nation's current emphasis on health-related, criterion-referenced fitness testing and programming to children and adolescents with disabilities. It summarizes project activities leading up to the Brockport Physical Fitness Test and related measures. Activities included:…

  15. The Indiana Deafblind Services Project: Services for Children with Deafblindness Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Indiana State Univ., Terre Haute. Blumberg Center for Interdisciplinary Studies in Special Education.

    This final report describes activities and accomplishments of the Indiana Deaf-Blind Services Project, a 4-year federally funded project to enhance and further develop coordinated direct services to children and youth, birth through 2 and ages 18 through 21. The project also was designed to provide technical assistance to public and private…

  16. 76 FR 17460 - South Texas Project Nuclear Operating Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ...] South Texas Project Nuclear Operating Company; Establishment of Atomic Safety and Licensing Board..., 2.318, and 2.321, notice is hereby given that an Atomic Safety and Licensing Board (Board) is being...: Ronald M. Spritzer, Chair, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission...

  17. Griffith Energy Project Final Environmental Impact Statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner,more » needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.« less

  18. 76 FR 56973 - Office of National Marine Sanctuaries Final Policy and Permit Guidance for Submarine Cable Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... National Marine Sanctuaries Final Policy and Permit Guidance for Submarine Cable Projects AGENCY: Office of National Marine Sanctuaries (ONMS), National Oceanic and Atmospheric Administration (NOAA), Department of... Marine Sanctuaries (ONMS) has developed final policy and permitting guidance for submarine cable projects...

  19. Medicare and Medicaid programs; fire safety requirements for certain health care facilities; amendment. Final rule.

    PubMed

    2006-09-22

    This final rule adopts the substance of the April 15, 2004 tentative interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment allows certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This final rule also requires that nursing facilities at least install battery-operated single station smoke alarms in resident rooms and common areas if they are not fully sprinklered or they do not have system-based smoke detectors in those areas. Finally, this final rule confirms as final the provisions of the March 25, 2005 interim final rule with changes and responds to public comments on that rule.

  20. Expressive Arts Project for Young Children with Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Hutinger, Patricia L.

    This final report describes activities and accomplishments of the Expressive Arts Project for Young Children with Disabilities, which developed and evaluated a CD-ROM, ArtSpace. The program, developed on a Macintosh platform, allows the child to either view or make art. It offers real time video, music especially produced to accompany images,…

  1. Using a Multimedia Final Project in an IT Ethics Course

    ERIC Educational Resources Information Center

    Howard, Elizabeth V.; Woods, David M.

    2016-01-01

    In previous semesters of our IT Ethics course, students created traditional final projects where they presented some topic in IT Ethics that we did not cover during the course. Students were free to choose how they would present their information with most groups choosing a traditional presentation where some members of the group were clearly…

  2. Leading Curriculum Innovation in Primary Schools Project: A Final Report

    ERIC Educational Resources Information Center

    Brundrett, Mark; Duncan, Diane

    2015-01-01

    This article provides the final report on a research project that investigated the ways in which curriculum innovation can be led successfully in primary schools. Data gathering included 40 semi-structured interviews in 10 successful primary schools in England of varying sizes and types and in a range of geographical and social locations. Findings…

  3. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adonizio, Mary Ann; Corren, Dean; Smith, Ron

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  4. Aviation Trends Related to Atmospheric Environment Safety Technologies Project Technical Challenges

    NASA Technical Reports Server (NTRS)

    Reveley, Mary S.; Withrow, Colleen A.; Barr, Lawrence C.; Evans, Joni K.; Leone, Karen M.; Jones, Sharon M.

    2014-01-01

    Current and future aviation safety trends related to the National Aeronautics and Space Administration's Atmospheric Environment Safety Technologies Project's three technical challenges (engine icing characterization and simulation capability; airframe icing simulation and engineering tool capability; and atmospheric hazard sensing and mitigation technology capability) were assessed by examining the National Transportation Safety Board (NTSB) accident database (1989 to 2008), incidents from the Federal Aviation Administration (FAA) accident/incident database (1989 to 2006), and literature from various industry and government sources. The accident and incident data were examined for events involving fixed-wing airplanes operating under Federal Aviation Regulation (FAR) Parts 121, 135, and 91 for atmospheric conditions related to airframe icing, ice-crystal engine icing, turbulence, clear air turbulence, wake vortex, lightning, and low visibility (fog, low ceiling, clouds, precipitation, and low lighting). Five future aviation safety risk areas associated with the three AEST technical challenges were identified after an exhaustive survey of a variety of sources and include: approach and landing accident reduction, icing/ice detection, loss of control in flight, super density operations, and runway safety.

  5. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  6. Evaluation of Safety, Quality and Productivity in Construction

    NASA Astrophysics Data System (ADS)

    Usmen, M. A.; Vilnitis, M.

    2015-11-01

    This paper examines the success indicators of construction projects, safety, quality and productivity, in terms of their implications and impacts during and after construction. First safety is considered during construction with a focus on hazard identification and the prevention of occupational accidents and injuries on worksites. The legislation mandating safety programs, training and compliance with safety standards is presented and discussed. Consideration of safety at the design stage is emphasized. Building safety and the roles of building codes in prevention of structural failures are also covered in the paper together with factors affecting building failures and methods for their prevention. Quality is introduced in the paper from the perspective of modern total quality management. Concepts of quality management, quality control, quality assurance and Six Sigma and how they relate to building quality and structural integrity are discussed with examples. Finally, productivity concepts are presented with emphasis on effective project management to minimize loss of productivity, complimented by lean construction and lean Six Sigma principles. The paper concludes by synthesizing the relationships between safety, quality and productivity.

  7. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... assurance program will be implemented; (26) The applicant's organizational structure, allocations or... presents a safety analysis of the structures, systems, and components of the facility as a whole. The final... contain an analysis and evaluation of the major structures, systems, and components of the facility that...

  8. Staff Helping Attain Relevant Education (Project SHARE): Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Ranadive, Jyoti

    Project SHARE (Staff Helping Attain Relevant Education), a project funded by Title VII of the Elementary and Secondary Education Act, was in its third and final year of operation in 1992-93, in eight primary schools in the Bronx, Brooklyn, and Manhattan (New York). The project served 141 limited English proficient students from low-income families…

  9. Inventory of Federal energy-related environment and safety research for FY 1977. Volume II. Project listings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This volume contains Biomedical and Environmental Research, Environmental Control Technology Research, and Operational and Environmental Safety Research project listings. The projects are ordered numerically by log number.

  10. 77 FR 30514 - Native Hawaiian Career and Technical Education Program; Final Waiver and Extension of Project Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native Hawaiian Career and Technical Education Program; Final Waiver and.... ACTION: Notice. Overview Information Final Waiver and Extension of Project Period for the Native Hawaiian.... SUMMARY: For 36-month projects funded in fiscal year (FY) 2009 under the Native Hawaiian Career and...

  11. 75 FR 7029 - Notice of Availability of the Final Environmental Assessment for Solar Roof Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-16

    ... Assessment for Solar Roof Project AGENCY: United States Geological Survey. ACTION: Notice of availability... Final Environmental Assessment for the Solar Roof Project and by this notice is announcing its... Individuals wishing to receive copies of the Environmental Assessment for the Solar Roof Project should...

  12. Specific issues, exact locations: case study of a community mapping project to improve safety in a disadvantaged community.

    PubMed

    Qummouh, Rana; Rose, Vanessa; Hall, Pat

    2012-12-01

    Safety is a health issue and a significant concern in disadvantaged communities. This paper describes an example of community-initiated action to address perceptions of fear and safety in a suburb in south-west Sydney which led to the development of a local, community-driven research project. As a first step in developing community capacity to take action on issues of safety, a joint resident-agency group implemented a community safety mapping project to identify the extent of safety issues in the community and their exact geographical location. Two aerial maps of the suburb, measuring one metre by two metres, were placed on display at different locations for four months. Residents used coloured stickers to identify specific issues and exact locations where crime and safety were a concern. Residents identified 294 specific safety issues in the suburb, 41.9% (n=123) associated with public infrastructure, such as poor lighting and pathways, and 31.9% (n=94) associated with drug-related issues such as drug activity and discarded syringes. Good health promotion practice reflects community need. In a very practical sense, this project responded to community calls for action by mapping resident knowledge on specific safety issues and exact locations and presenting these maps to local decision makers for further action.

  13. 38. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. BRIDGE AT STATION 85+. - Haleakala National Park Roads, Pukalani, Maui County, HI

  14. Evaluating pedestrian safety improvements : final report.

    DOT National Transportation Integrated Search

    2012-12-01

    The purpose of the study was to evaluate the impact of new pedestrian countermeasure installations on pedestrian safety to assist in informing future pedestrian safety initiatives. In order to address these objectives, the WMU team conducted a litera...

  15. Modeling and analyzing traffic safety perceptions: An application to the speed limit reduction pilot project in Edmonton, Alberta.

    PubMed

    El-Basyouny, Karim; El-Bassiouni, Mohamed Yahia

    2013-03-01

    To address the speeding problem in residential areas, the City of Edmonton initiated a pilot project to reduce the posted speed limit from 50km/h to 40km/h within six residential communities. This paper investigates the community perceptions of traffic safety within the six pilot communities in two phases: prior to project initiation (pre-pilot) and following the end of the project (post-pilot). This objective was accomplished by analyzing the results of two random dialing telephone surveys comprising 300 residents each. A preliminary analysis showed compatible demographic configurations for the two samples and confirmed that the residents were aware of both the posted speed limits and the adopted speed management controls. For the confirmatory factor analysis (CFA), a two-group (pre-pilot and post-pilot) three-factor model was used to assess the residents' perceptions of the speeding behavior (Speeding), their concerns about traffic safety issues (Concerns), and their perceptions of traffic safety (Safety). Comparing the CFA results of the post-pilot survey versus those of the pre-pilot survey, it was evident that there was a significant decrease in Speeding and Concerns accompanied by a significant increase in Safety. A structural equations model (SEM) was also fitted to the data in order to assess the impact of Speeding and Concerns on Safety. The results showed that Concerns increase significantly with Speeding, and that both factors have significant negative impacts on Safety. However, while the impact of Concerns on Safety was direct, that of Speeding on Safety was largely indirect (i.e., mediated through Concerns). Overall, the multivariate analysis has demonstrated that the pilot project was successful in improving the residents' perceptions of traffic safety in their community. Crown Copyright © 2012. Published by Elsevier Ltd. All rights reserved.

  16. U. S. research safety vehicle (RSV) phase I program. Volume III. RSV characteristics and performance specifications. Final report, Jan 1974--Apr 1975

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andon, J.; Dodson, E.; Khadilkar, A.

    1975-06-01

    Current passenger car usage patterns and factors influencing usage are analyzed and projections of usage patterns in the mid-1980's are made. Current available data on six categories of vehicle accidents are analyzed and projections made of national accident patterns in the mid-80's; the effect of potential reductions in these projections as a result of safety programs and other factors related to driving safety are estimated. Based on the usage and accident projections, the characteristics of an RSV (weighing under 3,000 lbs C.W.) for operation in the mid-1980 traffic environment are described. A recommended set of specifications for the RSV aremore » developed considering the potential safety payoff accruing to an increased level of safety performance, the need for energy conservation, availability of material resources, and changes in vehicle mix. (An executive summary of this report is presented in Volume I).« less

  17. GATE: Energy Efficient Vehicles for Sustainable Mobility-Project TI022- FinalReport

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rizzoni, Giorgio

    Unique opportunity for industry to engage in original, highly leveraged precompetitive research in automotive and transportation systems, with focus on advanced propulsion systems; fuel economy; vehicle safety, connectivity and autonomy; and advanced driver assistance systems Additional benefits: prepare graduate students for future careers in automotive industry, reaching undergraduate students through capstone design and other project activities, focused recruitment events

  18. Integration of Occupational Safety to Contractors` or Subcontractors` Performance Evaluation in Construction Projects

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Struková, Zuzana

    2013-06-01

    Several factors should be considered by the owner and general contractor in the process of contractors` and subcontractors` selection and evaluation. The paper reviews the recent models addressed to guide general contractors in subcontractors' selection process and in evaluation of different contractors during the execution of the project. Moreover the paper suggests the impact of different contractors' performance to the overall level of occupational health and safety culture at the sites. It deals with the factors influencing the safety performance of contractors during construction and analyses the methods for assessing the safety performance of construction contractors. The results of contractors' safety performance evaluation could be a useful tool in motivating contractors to achieve better safety outcomes or could have effect on owners` or general contractors' decision making about contractors suitability for future contracting works.

  19. Trends in public information within the Fairfax Alcohol Safety Action Project, 1975.

    DOT National Transportation Integrated Search

    1976-01-01

    To assess current trends in the effectiveness of the public information and education countermeasure of the Fairfax Alcohol Safety Action Project, two pieces of survey type research are conducted on a periodic basis. The roadside survey has been cond...

  20. Drinking-driving patterns at night : baseline roadside survey of the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1974-01-01

    As part of the Fairfax Alcohol Safety Action Project (ASAP), staff members of the Virginia Highway Research Council, acting in their role as evaluators of the project, conducted a baseline survey of the nighttime drinking-driving patterns in Fairfax,...

  1. Test and Evaluation Master Plan (TEMP) for the Ports and Waterways Safety System (PAWSS) Project

    DOT National Transportation Integrated Search

    1997-01-01

    This document outlines the Test Concept for the Ports and Waterways Safety System (PAWSS) Project. This Test and Evaluation Master Plan (TEMP) purpose is to reduce risk and ensure the PAWSS project meets all System Specification and Statement of Work...

  2. Final Technical Report, Wind Generator Project (Ann Arbor)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geisler, Nathan

    A Final Technical Report (57 pages) describing educational exhibits and devices focused on wind energy, and related outreach activities and programs. Project partnership includes the City of Ann Arbor, MI and the Ann Arbor Hands-on Museum, along with additional sub-recipients, and U.S. Department of Energy/Office of Energy Efficiency and Renewable Energy (EERE). Report relays key milestones and sub-tasks as well as numerous graphics and images of five (5) transportable wind energy demonstration devices and five (5) wind energy exhibits designed and constructed between 2014 and 2016 for transport and use by the Ann Arbor Hands-on Museum.

  3. 36. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. TYPICAL RUBBLE MASONRY HEADWALL AND BOX CULVERT. - Haleakala National Park Roads, Pukalani, Maui County, HI

  4. Ares Project Overview - Quality in Design

    NASA Technical Reports Server (NTRS)

    Cianciola, Chris; Crane, Kenneth

    2008-01-01

    This presentation introduces the audience to the overall goals of the Ares Project, which include providing human access to low-Earth orbit, the Moon, and beyond. The presentation also provides an overview of with the vehicles that will execute those goals and progress made on the vehicles to date. The briefing will provide an introduction to Lean, Six Sigma, and Kaizen practices Ares will use to improve the overall effectiveness and quality of its efforts. Finally, the briefing includes a summary of Safety and Mission Assurance practices being implemented within[Ares to ensure safety and quality early in the design process. Integrating Safety and Mission Assurance in Design: This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safer T and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

  5. 76 FR 19744 - Final Tropic to Hatch 138 kV Transmission Line Project Environmental Impact Statement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... DEPARTMENT OF AGRICULTURE Forest Service Final Tropic to Hatch 138 kV Transmission Line Project..., has prepared a Final Environmental Impact Statement (FEIS) for the Tropic to Hatch 138 kV Transmission.... ADDRESSES: Copies of the Tropic to Hatch 138 kV Transmission Line Project FEIS/PMPA for the Grand Staircase...

  6. Supervisors' Perceptions of Research Competencies in the Final-Year Project

    ERIC Educational Resources Information Center

    Reguant, Mercedes; Martínez-Olmo, Francesc; Contreras-Higuera, Williams

    2018-01-01

    Background: This paper analyses the development of research competencies in higher education students, particularly with regard to the undergraduate Final-Year Project (FYP). The FYP is understood as an assignment that requires the integration of learning outcomes and demonstration of competencies for the successful completion of the degree.…

  7. Innovative safety valve selection techniques and data.

    PubMed

    Miller, Curt; Bredemyer, Lindsey

    2007-04-11

    The new valve data resources and modeling tools that are available today are instrumental in verifying that that safety levels are being met in both current installations and project designs. If the new ISA 84 functional safety practices are followed closely, good industry validated data used, and a user's maintenance integrity program strictly enforced, plants should feel confident that their design has been quantitatively reinforced. After 2 years of exhaustive reliability studies, there are now techniques and data available to support this safety system component deficiency. Everyone who has gone through the process of safety integrity level (SIL) verification (i.e. reliability math) will appreciate the progress made in this area. The benefits of these advancements are improved safety with lower lifecycle costs such as lower capital investment and/or longer testing intervals. This discussion will start with a review of the different valve, actuator, and solenoid/positioner combinations that can be used and their associated application restraints. Failure rate reliability studies (i.e. FMEDA) and data associated with the final combinations will then discussed. Finally, the impact of the selections on each safety system's SIL verification will be reviewed.

  8. CBSS Outreach Project: Computer-Based Study Strategies for Students with Learning Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Anderson-Inman, Lynne; Ditson, Mary

    This final report describes activities and accomplishments of the four-year Computer-Based Study Strategies (CBSS) Outreach Project at the University of Oregon. This project disseminated information about using computer-based study strategies as an intervention for students with learning disabilities and provided teachers in participating outreach…

  9. 35. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. LOOKING BACK FROM STATION 335 AT RETURN CURVE. - Haleakala National Park Roads, Pukalani, Maui County, HI

  10. Projecting the health and economic impact of road safety initiatives: a case study of a multi-country project.

    PubMed

    Esperato, Alexo; Bishai, David; Hyder, Adnan A

    2012-01-01

    The Road Safety in 10 Countries (RS-10) project will implement 12 different road safety interventions at specific sites within 10 low- and middle-income countries (LMICs). This evaluation reports the number of lives that RS-10 is projected to save in those locations, the economic value of the risk reduction, and the maximum level of investment that a public health intervention of this magnitude would be able to incur before its costs outweigh its health benefits. We assumed a 5-year time implementation horizon corresponding to the duration of RS-10. Based on a preliminary literature review, we estimated the effectiveness for each of the RS-10 interventions. Applying these effectiveness estimates to the size of the population at risk at RS-10 sites, we calculated the number of lives and life years saved (LYS) by RS-10. We projected the value of a statistical life (VSL) in each RS-10 country based on gross national income (GNI) and estimated the value of the lives saved using each country's VSL. Sensitivity analysis addressed robustness to assumptions about elasticity, discount rates, and intervention effectiveness. From the evidence base reviewed, only 13 studies met our selection criteria. Such a limited base presents uncertainties about the potential impact of the modeled interventions. We tried to account for these uncertainties by allowing effectiveness to vary ± 20 percent for each intervention. Despite this variability, RS-10 remains likely to be worth the investment. RS-10 is expected to save 10,310 lives over 5 years (discounted at 3%). VSL and $/LYS methods provide concordant results. Based on our estimates of each country's VSL, the respective countries would be willing to pay $2.45 billion to lower these fatality risks (varying intervention effectiveness by ± 20 percent, the corresponding range is $2.0-$2.9 billion). Analysis based on $/LYS shows that the RS-10 project will be cost-effective as long as its costs do not exceed $5.14 billion (under ± 20

  11. 78 FR 16211 - Safety Zone, Corp. Event Finale UHC, St. Thomas Harbor; St. Thomas, U.S. Virgin Islands

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... 1625-AA00 Safety Zone, Corp. Event Finale UHC, St. Thomas Harbor; St. Thomas, U.S. Virgin Islands... establish a temporary safety zone on the waters of St. Thomas Harbor in St. Thomas, U.S. Virgin Islands... near the St. Thomas Harbor channel from which fireworks will be lit. DATES: Comments and related...

  12. ERIP Project No. 670, Nevada Energy Control Systems, Inc.. Final techincal progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kimber, D.J.

    1998-02-11

    In order to gauge the effectiveness of the ERIP Project No. 670, Nevada Energy Control Systems, Inc., Grant Number DE-FG01-96EE15670, the Statement of Work must be compared to the achievements by NECSI during the grant period. The following report reflects the aforementioned statement and is coordinated directly with it. The project goal is to gather data and test in order to validate earlier tests of energy savings,safety,reliability and practicality of the NECSI Evaporator Fan Controller in order to fully commercialize and market the product.

  13. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    DOT National Transportation Integrated Search

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  14. Vocational Evaluation and Work Adjustment Bulletin; Vol. 8, Special Edition: Vocational Evaluation Project Final Report Part 1.

    ERIC Educational Resources Information Center

    Vocational Evaluation and Work Adjustment Association, Washington, DC.

    The first of three parts of the Vocational Evaluation Project final report contains an editorial, two task force reports, and brief summaries of the seven task force reports which comprise the final report. The editorial summarizes the project's purpose, its activities for the three years of its existence, and its results, and describes the task…

  15. 77 FR 70684 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good...

  16. 78 FR 2616 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... Bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good...

  17. GROWTH OF THE INTERNATIONAL CRITICALITY SAFETY AND REACTOR PHYSICS EXPERIMENT EVALUATION PROJECTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. Blair Briggs; John D. Bess; Jim Gulliford

    2011-09-01

    Since the International Conference on Nuclear Criticality Safety (ICNC) 2007, the International Criticality Safety Benchmark Evaluation Project (ICSBEP) and the International Reactor Physics Experiment Evaluation Project (IRPhEP) have continued to expand their efforts and broaden their scope. Eighteen countries participated on the ICSBEP in 2007. Now, there are 20, with recent contributions from Sweden and Argentina. The IRPhEP has also expanded from eight contributing countries in 2007 to 16 in 2011. Since ICNC 2007, the contents of the 'International Handbook of Evaluated Criticality Safety Benchmark Experiments1' have increased from 442 evaluations (38000 pages), containing benchmark specifications for 3955 critical ormore » subcritical configurations to 516 evaluations (nearly 55000 pages), containing benchmark specifications for 4405 critical or subcritical configurations in the 2010 Edition of the ICSBEP Handbook. The contents of the Handbook have also increased from 21 to 24 criticality-alarm-placement/shielding configurations with multiple dose points for each, and from 20 to 200 configurations categorized as fundamental physics measurements relevant to criticality safety applications. Approximately 25 new evaluations and 150 additional configurations are expected to be added to the 2011 edition of the Handbook. Since ICNC 2007, the contents of the 'International Handbook of Evaluated Reactor Physics Benchmark Experiments2' have increased from 16 different experimental series that were performed at 12 different reactor facilities to 53 experimental series that were performed at 30 different reactor facilities in the 2011 edition of the Handbook. Considerable effort has also been made to improve the functionality of the searchable database, DICE (Database for the International Criticality Benchmark Evaluation Project) and verify the accuracy of the data contained therein. DICE will be discussed in separate papers at ICNC 2011. The status of the ICSBEP and

  18. Project Continuity: A Handicapped Children's Early Education Project. Final Report, October 1, 1986 to September 30, 1989.

    ERIC Educational Resources Information Center

    Jackson, Barbara; Quinn, Judy

    The final report describes Project Continuity, a federally funded effort to provide continuity of care for handicapped infants with chronic illness or complex medical needs while in the acute care setting and to facilitate transition of the infant into the home environment. Goals were accomplished within the context of a family-centered…

  19. 78 FR 16208 - Safety Zone; V. I. Carnival Finale; St. Thomas Harbor; St. Thomas, U.S. Virgin Islands

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... 1625-AA00 Safety Zone; V. I. Carnival Finale; St. Thomas Harbor; St. Thomas, U.S. Virgin Islands AGENCY... establish a safety zone on the waters of St. Thomas Harbor in St. Thomas, U. S. Virgin Islands during the V..., 2013, and will entail a barge being positioned near the St. Thomas Harbor channel from which fireworks...

  20. 78 FR 57264 - Final Waiver and Extension of the Project Period for the Technical Assistance Coordination Center

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ...: 84.326Z.] Final Waiver and Extension of the Project Period for the Technical Assistance Coordination... project period. SUMMARY: The Secretary waives the requirements in the Education Department General Administrative Regulations that generally prohibit project periods exceeding five years and extensions of project...

  1. Alcohol safety action projects evaluation of operations : data, table of results, and formulation

    DOT National Transportation Integrated Search

    1979-06-01

    This volume contains the data used in the evaluation of 35 Alcohol Safety Action Projects implemented throughout the country. Historical background, discussion of analytic results and factors affecting impact detecion are contained in the document ti...

  2. Classrooms beyond School Walls for Grades K-12. Mamaroneck Career Education Project. Final Report.

    ERIC Educational Resources Information Center

    Mamaroneck Union Free School District 1, NY.

    This document contains two reports on the Classrooms beyond Walls Career Education Project conducted by the Mamaroneck Union Free School District and the Sound Consortium for grades K-12 in the 1975-76 school year. The final report summarizes the project's major objectives (increasing self-awareness and decision-making skills, training teachers in…

  3. 37. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. HAND-LAID ROCK BERM ON RETURN CURVE TO PREVENT SCOUR AND SEEPAGE THROUGH FILLS. - Haleakala National Park Roads, Pukalani, Maui County, HI

  4. 77 FR 15009 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... zones to remain in effect throughout the duration of the construction and renewal of the Sellwood Bridge... safe distance from the construction area while transiting in the vicinity of the Sellwood Bridge...

  5. Analysis of Aviation Safety Reporting System Incident Data Associated with the Technical Challenges of the System-Wide Safety and Assurance Technologies Project

    NASA Technical Reports Server (NTRS)

    Withrow, Colleen A.; Reveley, Mary S.

    2015-01-01

    The Aviation Safety Program (AvSP) System-Wide Safety and Assurance Technologies (SSAT) Project asked the AvSP Systems and Portfolio Analysis Team to identify SSAT-related trends. SSAT had four technical challenges: advance safety assurance to enable deployment of NextGen systems; automated discovery of precursors to aviation safety incidents; increasing safety of human-automation interaction by incorporating human performance, and prognostic algorithm design for safety assurance. This report reviews incident data from the NASA Aviation Safety Reporting System (ASRS) for system-component-failure- or-malfunction- (SCFM-) related and human-factor-related incidents for commercial or cargo air carriers (Part 121), commuter airlines (Part 135), and general aviation (Part 91). The data was analyzed by Federal Aviation Regulations (FAR) part, phase of flight, SCFM category, human factor category, and a variety of anomalies and results. There were 38 894 SCFM-related incidents and 83 478 human-factorrelated incidents analyzed between January 1993 and April 2011.

  6. PRELIMINARY NUCLEAR CRITICALITY NUCLEAR SAFETY EVLAUATION FOR THE CONTAINER SURVEILLANCE AND STORAGE CAPABILITY PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Low, M; Matthew02 Miller, M; Thomas Reilly, T

    2007-04-30

    Washington Safety Management Solutions (WSMS) provides criticality safety services to Washington Savannah River Company (WSRC) at the Savannah River Site. One activity at SRS is the Container Surveillance and Storage Capability (CSSC) Project, which will perform surveillances on 3013 containers (hereafter referred to as 3013s) to verify that they meet the Department of Energy (DOE) Standard (STD) 3013 for plutonium storage. The project will handle quantities of material that are greater than ANS/ANSI-8.1 single parameter mass limits, and thus required a Nuclear Criticality Safety Evaluation (NCSE). The WSMS methodology for conducting an NCSE is outlined in the WSMS methods manual.more » The WSMS methods manual currently follows the requirements of DOE-O-420.1B, DOE-STD-3007-2007, and the Washington Savannah River Company (WSRC) SCD-3 manual. DOE-STD-3007-2007 describes how a NCSE should be performed, while DOE-O-420.1B outlines the requirements for a Criticality Safety Program (CSP). The WSRC SCD-3 manual implements DOE requirements and ANS standards. NCSEs do not address the Nuclear Criticality Safety (NCS) of non-reactor nuclear facilities that may be affected by overt or covert activities of sabotage, espionage, terrorism or other security malevolence. Events which are beyond the Design Basis Accidents (DBAs) are outside the scope of a double contingency analysis.« less

  7. An injury prevention strategy for teen restaurant workers. Washington State's ProSafety project.

    PubMed

    Ward, Julie A; de Castro, A B; Tsai, Jenny Hsin-Chun; Linker, Darren; Hildahl, Lyle; Miller, Mary E

    2010-02-01

    High levels of youth employment, workplace hazards, and characteristics unique to adolescents contribute to a relatively high incidence of injuries among teens in the restaurant industry. This article discusses the ProSafety model of injury prevention among teen restaurant workers. Through integration with an existing career and technical education program, the ProSafety project seeks to prevent occupational injuries among the teen worker population through classroom safety education and internship skills reinforcement. ProSafety is the product of an innovative collaboration with occupational health nurses, business professionals, educators, and government. Its approach is derived from Social Cognitive Theory, is consistent with key values and strategies of occupational health nurses, and provides lessons for practitioners seeking to reduce occupational injuries in food service or among other populations of adolescent workers.

  8. Principles of Safety Pharmacology

    PubMed Central

    Pugsley, M K; Authier, S; Curtis, M J

    2008-01-01

    Safety Pharmacology is a rapidly developing discipline that uses the basic principles of pharmacology in a regulatory-driven process to generate data to inform risk/benefit assessment. The aim of Safety Pharmacology is to characterize the pharmacodynamic/pharmacokinetic (PK/PD) relationship of a drug's adverse effects using continuously evolving methodology. Unlike toxicology, Safety Pharmacology includes within its remit a regulatory requirement to predict the risk of rare lethal events. This gives Safety Pharmacology its unique character. The key issues for Safety Pharmacology are detection of an adverse effect liability, projection of the data into safety margin calculation and finally clinical safety monitoring. This article sets out to explain the drivers for Safety Pharmacology so that the wider pharmacology community is better placed to understand the discipline. It concludes with a summary of principles that may help inform future resolution of unmet needs (especially establishing model validation for accurate risk assessment). Subsequent articles in this issue of the journal address specific aspects of Safety Pharmacology to explore the issues of model choice, the burden of proof and to highlight areas of intensive activity (such as testing for drug-induced rare event liability, and the challenge of testing the safety of so-called biologics (antibodies, gene therapy and so on.). PMID:18604233

  9. Research and Development Project in Career Education. Final Report. Volume III.

    ERIC Educational Resources Information Center

    Washington State Coordinating Council for Occupational Education, Olympia.

    The final volume in the report on the Research and Development Project in Career Education is in two parts. The first, "Interest Inventories, Tests, Surveys, and Scales: A Compilation," is by James T. Jurgens. It is designed to acquaint teachers and counselors with 66 interest measurement instruments that are presently on the market. For most,…

  10. Bicycle and pedestrian safety in the highway safety manual : final report.

    DOT National Transportation Integrated Search

    2016-07-01

    An accurate understanding of the expected effectiveness of bicycle and pedestrian safety : countermeasures is needed to support decisions about how to best allocate limited public : resources to increase safety for non-motorized users. However, the k...

  11. Final safety analysis report for the Galileo Mission: Volume 2: Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The General Purpose Heat Source Radioisotope Thermoelectric Generator (GPHS-RTG) will be used as the prime source of electric power for the spacecraft on the Galileo mission. The use of radioactive material in these missions necessitates evaluations of the radiological risks that may be encountered by launch complex personnel and by the Earth's general population resulting from postulated malfunctions or failures occurring in the mission operations. The purpose of the Final Safety Analysis Report (FSAR) is to present the analyses and results of the latest evaluation of the nuclear safety potential of the GPHS-RTG as employed in the Galileo mission. Thismore » evaluation is an extension of earlier work that addressed the planned 1986 launch using the Space Shuttle Vehicle with the Centaur as the upper stage. This extended evaluation represents the launch by the Space Shuttle/IUS vehicle. The IUS stage has been selected as the vehicle to be used to boost the Galileo spacecraft into the Earth escape trajectory after the parking orbit is attained.« less

  12. 76 FR 34773 - Final Safety Culture Policy Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... Special Joint Session on Safety Culture at the Health Physics Society Annual Meeting, and presentations on... safety-first focus in nuclear work environments for public health and safety. The Commission's emphasis... operations, if attacked, could have an impact on public health and safety. During the early years of...

  13. Project Future Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…

  14. The Union RAP: Industry-Wide Research-Action Projects to Win Health and Safety Improvements

    PubMed Central

    McQuiston, Thomas H.; Lippin, Tobi Mae; Anderson, Leeann G.; Beach, M. Josie; Frederick, James; Seymour, Thomas A.

    2009-01-01

    Unions are ripe to engage in community-based participatory research (CBPR). We briefly profile 3 United Steelworker CBPR projects aimed at uncovering often-undocumented, industry-wide health and safety conditions in which US industrial workers toil. The results are to be used to advocate improvements at workplace, industry, and national policy levels. We offer details of our CBPR approach (Research-Action Project [RAP]) that engages workers and others in all research stages. Elements of RAPs include strategically constructed teams with knowledge of the industry and health and safety and with skills in research, participatory facilitation, and training; reciprocal training on these knowledge and skill areas; iterative processes of large and small group work; use of technology; and facilitator-developed tools and intermediate products. PMID:19890145

  15. Failure Modes Effects and Criticality Analysis, an Underutilized Safety, Reliability, Project Management and Systems Engineering Tool

    NASA Astrophysics Data System (ADS)

    Mullin, Daniel Richard

    2013-09-01

    The majority of space programs whether manned or unmanned for science or exploration require that a Failure Modes Effects and Criticality Analysis (FMECA) be performed as part of their safety and reliability activities. This comes as no surprise given that FMECAs have been an integral part of the reliability engineer's toolkit since the 1950s. The reasons for performing a FMECA are well known including fleshing out system single point failures, system hazards and critical components and functions. However, in the author's ten years' experience as a space systems safety and reliability engineer, findings demonstrate that the FMECA is often performed as an afterthought, simply to meet contract deliverable requirements and is often started long after the system requirements allocation and preliminary design have been completed. There are also important qualitative and quantitative components often missing which can provide useful data to all of project stakeholders. These include; probability of occurrence, probability of detection, time to effect and time to detect and, finally, the Risk Priority Number. This is unfortunate as the FMECA is a powerful system design tool that when used effectively, can help optimize system function while minimizing the risk of failure. When performed as early as possible in conjunction with writing the top level system requirements, the FMECA can provide instant feedback on the viability of the requirements while providing a valuable sanity check early in the design process. It can indicate which areas of the system will require redundancy and which areas are inherently the most risky from the onset. Based on historical and practical examples, it is this author's contention that FMECAs are an immense source of important information for all involved stakeholders in a given project and can provide several benefits including, efficient project management with respect to cost and schedule, system engineering and requirements management

  16. Patient safety and quality improvement: civil money penalty inflation adjustment. Direct final rule.

    PubMed

    2009-08-25

    The Department of Health and Human Services amends the Patient Safety and Quality Improvement Rule by adjusting for inflation the maximum civil money penalty amount for violations of the confidentiality provisions of the Rule. We are amending the penalty amount to comply with the Federal Civil Penalties Inflation Adjustment Act of 1990. We are using direct final rulemaking for this action because we expect that there will be no significant adverse comment on the rule.

  17. 77 FR 66480 - Final Environmental Impact Statement, Narrows Project, Sanpete County, Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... availability. SUMMARY: We, the Bureau of Reclamation, announce the availability of the final environmental impact statement on the Narrows Project, a non- Federal dam and reservoir proposed by the Sanpete Water... Availability of Weekly Receipt of Environmental Impact Statements in the Federal Register. This notice, usually...

  18. 39. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H., by Merel S. Sager, Resident Landscape Architect, April 16, 1935. COVERING CONSPICOUS ROCK FILLS WITH SOIL. - Haleakala National Park Roads, Pukalani, Maui County, HI

  19. Promoting the safe and strategic use of technology for victims of intimate partner violence: evaluation of the technology safety project.

    PubMed

    Finn, Jerry; Atkinson, Teresa

    2009-11-01

    The Technology Safety Project of the Washington State Coalition Against Domestic Violence was designed to increase awareness and knowledge of technology safety issues for domestic violence victims, survivors, and advocacy staff. The project used a "train-the-trainer" model and provided computer and Internet resources to domestic violence service providers to (a) increase safe computer and Internet access for domestic violence survivors in Washington, (b) reduce the risk posed by abusers by educating survivors about technology safety and privacy, and (c) increase the ability of survivors to help themselves and their children through information technology. Evaluation of the project suggests that the program is needed, useful, and effective. Consumer satisfaction was high, and there was perceived improvement in computer confidence and knowledge of computer safety. Areas for future program development and further research are discussed.

  20. The CDCC's Project No. 7: "The Education and Cultural Development of Migrants." Final Report of the Project Group.

    ERIC Educational Resources Information Center

    Council for Cultural Cooperation, Strasbourg (France).

    The final report of a project group representing the 18 member countries of the Council of Europe Council for Cultural Co-operation investigates education and cultural development of migrants. The report discusses methodology and reasons for selecting an intercultural approach to migrant education in terms of interculturalism's basic elements:…

  1. Project Developmental Continuity Evaluation: Final Report. Volume II: The Process of Program Implementation in PDC.

    ERIC Educational Resources Information Center

    Wacker, Sally; And Others

    The second of two volumes, this document continues the final evaluation report of Project Developmental Continuity (PDC), a Head Start demonstration project initiated in 1974 to develop program models which enhance children's social competence by fostering developmental continuity from preschool through the early elementary grades. In particular,…

  2. Project to Incorporate Anthropological Concepts of Human Diversity in Secondary School Social Studies Curricula (Project Anthropology). Final Report, 2/1/80 to 1/31/82.

    ERIC Educational Resources Information Center

    Giannangelo, Duane M.; And Others

    Learning modules emphasizing the anthropological aspects of human and race relations to supplement social studies textbooks used in grades 7-12 were developed. The final report describes pre-project activities, module development, and project evaluation and accomplishments. Pre-project activities included media publicity, reviewing social studies…

  3. Project CREATE Final Report. Cooperative Resources To Enhance Access to Technology Education.

    ERIC Educational Resources Information Center

    Hampden County Employment and Training Consortium, Springfield, MA.

    These materials have been developed by Project CREATE (Cooperative Resources to Enhance Access to Jobs through Technical Education), a demonstration program designed to develop a network, specific activities, and resources that would provide education and support services to a wide audience. A 13-page final report describes the hands-on training…

  4. School Age Multihandicapped Project: Capital Area Rehabilitation Center. Final Report 1977-1980.

    ERIC Educational Resources Information Center

    Capital Area Rehabilitation Center, Austin, TX.

    The document contains the final report of a model project to provide a therapeutically based educational program for severely handicapped, orthopedically impaired children (6 to 21 years old) utilizing the skills of teachers, aides, therapists, and a nurse to provide individualized hands on services. Section I contains an overview of the…

  5. 78 FR 45268 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... decommission the Ocotillo Sol Solar Project, a solar photovoltaic (PV) power plant facility, on approximately... Applicant's Proposed Project to construct, operate, maintain, and decommission a 100-acre solar PV facility...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final Environmental...

  6. Building a Network of Services: 1963-1971. Final Report: Greater Cleveland Mental Retardation Development Project.

    ERIC Educational Resources Information Center

    Buckman, Rilma Oxley

    The final report documents the Greater Cleveland Mental Retardation Development Project, a 5-year demonstration project concerned with solving such problems as how a community can provide all the services and programs needed by the retarded and their families, ensure successful and appropriate employment, and staff and finance such programs.…

  7. The Collaborative Planning Outreach Project: Building Comprehensive Early Childhood Systems. Final Report.

    ERIC Educational Resources Information Center

    Smith, Barbara J.

    This final report describes the objectives, activities and outcomes of a federally funded initiative to train and assist early childhood interagency teams in a model of planning systems and services for all young children, including children with disabilities and other special needs. The project is based on the value of stakeholder ownership in…

  8. The Citizenship Safety Project: a pilot study.

    PubMed

    Frederick, K; Barlow, J

    2006-02-01

    The Government White Paper Saving Lives: Our Healthier Nation (1999) provides a clear indication that accidents are a serious public health problem and have been targeted by the Department of Health as a key area for prevention over the next 10 years. School-based injury prevention programmes have been identified as one of the key settings for the implementation of the White Paper's heath promotion strategies. The Citizen Safety Project (CSP) is a peer-delivered injury prevention programme for Year 10 students (14-15 years) and Year 2 pupils (6-7 years). This paper summarizes the findings of a pilot study that assessed the feasibility of implementing the CSP in schools and of conducting a larger study. Working as part of their Personal Social Health Education lessons, 11 pairs (n = 22) of Year 10 students developed a project to take one accident prevention theme of their choice into a primary school to teach small groups of five or six Year 2 pupils (n = 55). A formative evaluation was conducted, based on interviews with Year 2 and Year 10 teachers (n = 2), and the diaries of Year 10 students. Knowledge of accident prevention and risk awareness was measured in Year 2 pupils using the Draw and Write technique, and impact on Year 10 students was measured using self-esteem and locus of control inventories. Using both statistical and thematic analysis the study concludes that the CSP is well accepted, improves knowledge in Year 2 pupils and boosts confidence in Year 10 students, while concurrently achieving key stage attainment targets. Implications of the study are discussed in terms of future research, as are recommendations with regard to modifications to the project.

  9. Through Shared Windows: Outreach Project for Infants, Toddlers, and Children with Developmental Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Harrison, Holly

    This final report describes activities and accomplishments of the Through Shared Windows (TSW) Outreach Project, a 4-year project at the University of New Mexico designed to improve services to young children with disabilities and their families. Three major outcomes were accomplished. First, a Web site was developed that focuses on observational…

  10. FAST DASH: Safety Technology Evaluation Project #1 – Blindspot Warning, 2012

    DOT National Transportation Integrated Search

    2014-01-01

    The objective of this research project was to examine the efficacy of the new restart rule promulgated as part of the Hours of Service of Drivers Final Rule, published on December 27, 2011, with a compliance date of July 1, 2013. Under the new restar...

  11. International Research Reactor Decommissioning Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leopando, Leonardo; Warnecke, Ernst

    2008-01-15

    Many research reactors have been or will be shut down and are candidates for decommissioning. Most of the respective countries neither have a decommissioning policy nor the required expertise and funds to effectively implement a decommissioning project. The IAEA established the Research Reactor Decommissioning Demonstration Project (R{sup 2}D{sup 2}P) to help answer this need. It was agreed to involve the Philippine Research Reactor (PRR-1) as model reactor to demonstrate 'hands-on' experience as it is just starting the decommissioning process. Other facilities may be included in the project as they fit into the scope of R{sup 2}D{sup 2}P and complement tomore » the PRR-1 decommissioning activities. The key outcome of the R{sup 2}D{sup 2}P will be the decommissioning of the PRR-1 reactor. On the way to this final goal the preparation of safety related documents (i.e., decommissioning plan, environmental impact assessment, safety analysis report, health and safety plan, cost estimate, etc.) and the licensing process as well as the actual dismantling activities could provide a model to other countries involved in the project. It is expected that the R{sup 2}D{sup 2}P would initiate activities related to planning and funding of decommissioning activities in the participating countries if that has not yet been done.« less

  12. 77 FR 23740 - Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ...We, the U.S. Fish and Wildlife Service (Service) and the California Department of Fish and Game (CDFG), in cooperation with the Sonoma Land Trust (SLT), announce that a final environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and Watershed Restoration Project is now available. The final EIR/EIS, which we prepared and now announce in accordance with the National Environmental Policy Act of 1969 (NEPA), describes the restoration of approximately 2,300 acres (ac) of former farmland located in Sonoma County, California, near the San Pablo Bay. The final EIR/EIS responds to all comments we received on the draft document. The restoration project, which would be implemented by the SLT, would restore natural estuarine ecosystems on diked baylands, while providing public access and recreational and educational opportunities compatible with ecological and cultural resources protection. The U.S. Army Corps of Engineers, San Francisco District, and the National Marine Fisheries Service of the National Oceanic and Atmospheric Administration are cooperating agencies on the final EIR/EIS.

  13. Description of the supporting factors of final project in Mathematics and Natural Sciences Faculty of Syiah Kuala University with multiple correspondence analysis

    NASA Astrophysics Data System (ADS)

    Rusyana, Asep; Nurhasanah; Maulizasari

    2018-05-01

    Syiah Kuala University (Unsyiah) is hoped to have graduates who are qualified for working or creating a field of work. A final project course implementation process must be effective. This research uses data from the evaluation conducted by Mathematics and Natural Sciences Faculty (FMIPA) of Unsyiah. Some of the factors that support the completion of the final project are duration, guidance, the final project seminars, facility, public impact, and quality. This research aims to know the factors that have a relationship with the completion of the final project and identify similarities among variables. The factors that support the completion of the final project at every study program in FMIPA are (1) duration, (2) guidance and (3) facilities. These factors are examined for the correlations by chi-square test. After that, the variables are analyzed with multiple correspondence analysis. Based on the plot of correspondence, the activities of the guidance and facilities in Informatics Study Program are included in the fair category, while the guidance and facilities in the Chemistry are included in the best category. Besides that, students in Physics can finish the final project with the fastest completion duration, while students in Pharmacy finish for the longest time.

  14. The Safety project: Sentinel-1 for Civil Protection geohazars management

    NASA Astrophysics Data System (ADS)

    Monserrat, Oriol; Herrera, Gerardo; Bianchini, Silvia; González-Alonso, Elena; Onori, Roberta; Reichenbach, Paola; Carralero, Innocente P.; Barra, Anna; María Mateos, Rosa; Solari, Lorenzo; Ligüérzana, Sergio; Pagliara, Paola; Ardizzone, Francesca; Sarro, Roberto; Crosetto, Michele; Béjar-Pizarro, Marta; Moretti, Sandro; Lopez, Carmen; Garcia-Cañada, Laura; Benito-Saz, María Á.

    2017-04-01

    This work is aimed at presenting the ongoing project SAFETY (Sentinel for Geohazards regional monitoring and forecasting). The use of Differential SAR Interferometry (DInSAR) in Natural Risks management is becoming more and more exploitable thanks to the experienced growth of the techniques. On one hand, since the DInSAR technique was proposed for the first time (1989) a wide number of data processing, analysis tools and methods have been developed, on the other hand the satellite data availability has increased and provides sensors with different characteristics of sensitivity and spatial and temporal resolutions. Nowadays, DInSAR allows to have a systematic overview about the spatio-temporal activity of a natural deformation phenomena, which is an important information for the risk management in terms of prevention, emergency response and post-emergency intervention. Specifically, Sentinel-1 (A and B) satellites data show two favourable characteristics: the wide covered area and the short revisit time (6 days). The last one, if compared with the other C band available sensors, results in a reduced temporal decorrelation, particularly in non-urbanized areas, in more robust processing results (due to the higher number of images) and in an higher temporal sampling i.e. a better monitoring and activity characterization. In this context, the European project SAFETY is focused on developing tools and implementing a methodology in order to better exploit Sentinel-1 data in the Civil Protection activities of natural risks prevention. The project is aimed at providing Civil Protection Authorities (CPA) with the capability of periodically evaluating and assessing the potential impact of geohazards (volcanic activity, earthquakes, landslides and subsidence) on urban areas. The first results over the two test-areas in Spain and Italy (respectively Canary Islands and Volterra Municipality) will be presented.

  15. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  16. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... on Sunrise Project, I-205 to Rock Creek Junction: Clackamas County, OR AGENCY: Federal Highway.... 139(l)(1). The actions relate to a proposed highway project, Sunrise Project, I-205 to Rock Creek... Project, I-205 to Rock Creek Junction Final Environmental Impact Statement, Record of Decision and other...

  17. 75 FR 47602 - Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ...] Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01) AGENCY: Food... product will be superior to the existing therapy. FDA provides grants for clinical studies on safety and... vaccine annually) and an explanation of how the proposed study will either help support product approval...

  18. Health, Safety and Performance in High Altitude Observatories: A Sustainable Approach

    NASA Astrophysics Data System (ADS)

    Böcker, Michael; Vogt, Joachim; Christ, Oliver; Müller-Leonhardt, Alice

    2009-09-01

    The research project “Optimising Performance, Health and Safety in High Altitude Observatories” was initiated by ESO to establish an approach to promote the well-being of staff working at its high altitude observatories, and in particular at the Antiplano de Chajnantor. A survey by a questionnaire given to both workers and visitors was employed to assess the effects of working conditions at high altitude. Earlier articles have outlined the project and reported early results. The final results and conclusions are presented, together with a concept for sustainable development to improve the performance, health and safety at high altitude employing Critical Incident Stress Management.

  19. Final Report for NIREC Renewable Energy Research & Development Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borland, Walt

    This report is a compilation of progress reports and presentations submitted by NIREC to the DOE’s Solar Energy Technologies Office for award number DE-FG36-08GO88161. This compilation has been uploaded to OSTI by DOE as a substitute for the required Final Technical Report, which was not submitted to DOE by NIREC or received by DOE. Project Objective: The primary goal of NIREC is to advance the transformation of the scientific innovation of the institutional partner’s research in renewable energy into a proof of the scientific concept eventually leading to viable businesses with cost effective solutions to accelerate the widespread adoption ofmore » renewable energy. NIREC will a) select research projects that are determined to have significant commercialization potential as a result of vetting by the Technology and commercialization Advisory Board, b) assign an experienced Entrepreneur-in-Residence (EIR) to each manage the scientific commercialization-preparedness process, and c) facilitate connectivity with venture capital and other private-sector capital sources to fund the rollout, scaling and growth of the resultant renewable energy business.« less

  20. Career Development Project. [Ogden, Utah City School District]. Final Report and Evaluation.

    ERIC Educational Resources Information Center

    Drechsel, Lionel

    Covering the time period of October 1972 to May 1974, the final report documents the efforts of a career education project in the Ogden City School District. In the elementary grades the program stressed the importance of work and workers and introduced some very basic careers. On the junior and senior high school levels, a career guidance and…

  1. 34. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, H.L. Handley, Assistant Highway Engineer, March 30, 1935. NOTE HOW THE LOCATION FITS THE CONTOUR OF THE HILL. LOOKING FROM STATION 382+00 ON HALEAKALA HIGHWAY. - Haleakala National Park Roads, Pukalani, Maui County, HI

  2. Safety performance functions for intersections : final report, December 2009.

    DOT National Transportation Integrated Search

    2009-12-01

    Road safety management activities include screening the network for sites with a potential for safety improvement (Network : Screening), diagnosing safety problems at specific sites, and evaluating the safety effectiveness of implemented : countermea...

  3. Aerobic Excercise and Research Opportunities to Benefit Impaired Children. (Project AEROBIC). Final Report.

    ERIC Educational Resources Information Center

    Idaho Univ., Moscow.

    The final report summarizes accomplishments of Project AEROBIC (Aerobic Exercise and Research Opportunities to Benefit Impaired Children), which provided a physical education exercise program for severely, profoundly, and multiply handicapped children aged 10-21. Activities are outlined for the 3 year period and include modification of exercise…

  4. Integrated Framework for Patient Safety and Energy Efficiency in Healthcare Facilities Retrofit Projects.

    PubMed

    Mohammadpour, Atefeh; Anumba, Chimay J; Messner, John I

    2016-07-01

    There is a growing focus on enhancing energy efficiency in healthcare facilities, many of which are decades old. Since replacement of all aging healthcare facilities is not economically feasible, the retrofitting of these facilities is an appropriate path, which also provides an opportunity to incorporate energy efficiency measures. In undertaking energy efficiency retrofits, it is vital that the safety of the patients in these facilities is maintained or enhanced. However, the interactions between patient safety and energy efficiency have not been adequately addressed to realize the full benefits of retrofitting healthcare facilities. To address this, an innovative integrated framework, the Patient Safety and Energy Efficiency (PATSiE) framework, was developed to simultaneously enhance patient safety and energy efficiency. The framework includes a step -: by -: step procedure for enhancing both patient safety and energy efficiency. It provides a structured overview of the different stages involved in retrofitting healthcare facilities and improves understanding of the intricacies associated with integrating patient safety improvements with energy efficiency enhancements. Evaluation of the PATSiE framework was conducted through focus groups with the key stakeholders in two case study healthcare facilities. The feedback from these stakeholders was generally positive, as they considered the framework useful and applicable to retrofit projects in the healthcare industry. © The Author(s) 2016.

  5. 78 FR 56944 - Strata Energy, Inc. (Ross In Situ Recovery Uranium Project); Notice of Atomic Safety and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ..., Inc. (Ross In Situ Recovery Uranium Project); Notice of Atomic Safety and Licensing Board Reconstitution Pursuant to 10 CFR 2.313(c) and 2.321(b), the Atomic Safety and Licensing Board (Board) in the... Craig M. White to serve on the Board in place of Administrative Judge Kenneth L. Mossman. All...

  6. Nevada State plan; final approval determination. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final State plan approval--Nevada.

    PubMed

    2000-04-18

    This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.

  7. Project S.P.I.C.E.: Special Partnership in Career Education. Final Report.

    ERIC Educational Resources Information Center

    Emerson, Debby H.; And Others

    The final report discusses Project SPICE (Special Partnership in Career Education) which produced a career awareness curriculum consisting of an implementation guide, and six teaching modules intended for use with educable mentally handicapped students (ages 11-to-13 years). Noted are the following program objectives (based on the National…

  8. Quality improvement for patient safety: project-level versus program-level learning.

    PubMed

    Rivard, Peter E; Parker, Victoria A; Rosen, Amy K

    2013-01-01

    Improving quality and patient safety is of increasing strategic importance to health care organizations. However, simply increasing the volume of quality improvement (QI) activity does not necessarily improve patient outcomes. There is a need for greater understanding of QI success factors. This study looked for differences in QI implementation across hospitals with a range of performance on Patient Safety Indicators. We conducted an exploratory comparative case study of 4 Veterans Health Administration hospitals including site visits and interviews with leaders and staff. Two themes emerged. Project-level QI learning is assessing and modifying specific QI projects relative to expectations. Program-level QI learning is assessing and modifying the overall QI endeavor. The nature of project-level QI learning was similar across sites, whereas we identified qualitative differences across organizations in program-level QI learning. The highest performing organization was evaluating and refining its overall approach to QI, whereas the others were learning how to build and control QI programs. Program-level QI learning may be key if a QI program is to succeed in improving patient outcomes. This type of organizational learning entails a big-picture, organization-wide view of QI. It also entails second-order organizational learning based on assessment not only of whether QI is being done correctly but also whether the right QI activities are being done, for the right reasons. The organization is "learning to learn." In addition to gaining mastery and control of QI, leaders regularly engage with staff in rethinking QI and experimenting with new approaches. Leaders also assess how QI activity fits in the organization's developmental journey and how it supports realization of strategy.

  9. Development of a Secondary School Physics Program: Harvard Project Physics. Volume 2, More Appendices. Final Report.

    ERIC Educational Resources Information Center

    Holton, Gerald; And Others

    As appendices to the final report on Project Physics (SE 015 500), this volume includes parts of the original documents concerning the project development. Articles published in the "Physics Teacher" are included in reprint form. Evaluation and research papers along with related materials issued in other publications are grouped into…

  10. DE-NE0000735 - FINAL REPORT ON THORIUM FUEL CYCLE NEUP PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krahn, Steven; Ault, Timothy; Worrall, Andrew

    The report is broken into six chapters, including this executive summary chapter. Following an introduction, this report discusses each of the project’s three major components (Fuel Cycle Data Package (FCDP) Development, Thorium Fuel Cycle Literature Analysis and Database Development, and the Thorium Fuel Cycle Technical Track and Proceedings). A final chapter is devoted to summarization. Various outcomes, publications, etc. originating from this project can be found in the Appendices at the end of the document.

  11. A Process Evaluation of Project Developmental Continuity: Final Report of the PDC Feasibility Study, 1974-1977.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This is the final report of the 3-year feasibility phase of a projected 7-year longitudinal evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Chapter I gives an overview of the PDC program…

  12. 77 FR 40601 - Final Priority: Disability and Rehabilitation Research Projects and Centers Program; Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... analyses of data, producing observational findings, and creating other sources of research-based... provide a rationale for the stage of research being proposed and the research methods associated with the... DEPARTMENT OF EDUCATION Final Priority: Disability and Rehabilitation Research Projects and...

  13. Blood alcohol test results of motor vehicle deaths as an evaluation method for the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1973-01-01

    The Fairfax Alcohol Safety Action Project (ASAP) was started following the June 1971 approval of the proposal and working plan submitted to the Department of Transportation by the Highway Safety Division of Virginia. A total of $2,123,000 was allocat...

  14. 77 FR 5566 - Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ...] Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County, New Mexico... Statement (Final EIS) for the HB In-Situ Solution Mine Project, and by this notice is announcing its... the Federal Register. ADDRESSES: Copies of the HB In-Situ Solution Mining EIS are available for public...

  15. TX-100 manufacturing final project report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashwill, Thomas D.; Berry, Derek S.

    This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. Themore » molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the

  16. The Physical Fitness of Adolescents with Cerebral Palsy. Project UNIQUE II. Final Report.

    ERIC Educational Resources Information Center

    Winnick, Joseph P.; Short, Francis X.

    The final report describes a 2-year project of the State University of New York, College at Brockport, to study the physical fitness of nonretarded and retarded adolescents with cerebral palsy. The UNIQUE Physical Fitness Test was administered to 203 cerebral palsied adolescents throughout the United States and from segregated and nonsegregated…

  17. 78 FR 61937 - Safety Zone; Port of Galveston, Pelican Island Bridge Repair

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-07

    ... Zone; Port of Galveston, Pelican Island Bridge Repair AGENCY: Coast Guard, DHS. ACTION: Temporary final... safety during the Pelican Island Bridge Repair Project. This action is necessary to protect public... barge will be placed under the Pelican Island Bridge; therefore immediate action is needed to protect...

  18. West Virginia Peer Exchange : Streamlining Highway Safety Improvement Program Project Delivery - An RSPCB Peer Exchange

    DOT National Transportation Integrated Search

    2014-09-01

    The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September 23 to 24, 2014 in Charleston, West V...

  19. Project TIME. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Schroyer, Connie J.; Payne, David L.

    Project TIME (Training Initiative for Manufacturing Employees) was an 18-month National Workplace Literacy Program conducted by Lord Fairfax Community College in conjunction with an automotive parts plant and Triplett Technical and Business Institute in Virginia. Project TIME had three primary objectives: to help employees obtain the basic…

  20. Comprehensive Evaluation Project. Final Report.

    ERIC Educational Resources Information Center

    1969

    This project sought to develop a set of tests for the assessment of the basic literacy and occupational cognizance of pupils in those public elementary and secondary schools, including vocational schools, receiving services through Federally supported educational programs and projects. The assessment is to produce generalizable average scores for…

  1. Projected Impact of Compositional Verification on Current and Future Aviation Safety Risk

    NASA Technical Reports Server (NTRS)

    Reveley, Mary S.; Withrow, Colleen A.; Leone, Karen M.; Jones, Sharon M.

    2014-01-01

    The projected impact of compositional verification research conducted by the National Aeronautic and Space Administration System-Wide Safety and Assurance Technologies on aviation safety risk was assessed. Software and compositional verification was described. Traditional verification techniques have two major problems: testing at the prototype stage where error discovery can be quite costly and the inability to test for all potential interactions leaving some errors undetected until used by the end user. Increasingly complex and nondeterministic aviation systems are becoming too large for these tools to check and verify. Compositional verification is a "divide and conquer" solution to addressing increasingly larger and more complex systems. A review of compositional verification research being conducted by academia, industry, and Government agencies is provided. Forty-four aviation safety risks in the Biennial NextGen Safety Issues Survey were identified that could be impacted by compositional verification and grouped into five categories: automation design; system complexity; software, flight control, or equipment failure or malfunction; new technology or operations; and verification and validation. One capability, 1 research action, 5 operational improvements, and 13 enablers within the Federal Aviation Administration Joint Planning and Development Office Integrated Work Plan that could be addressed by compositional verification were identified.

  2. Final PSD Permit Extension Letter - Energy Answers Arecibo, LLC/Energy Answers Arecibo Puerto Rico Renewable Energy Project, PR

    EPA Pesticide Factsheets

    This page contains the Final PSD Permit Extension Letter for Energy Answers Arecibo Puerto Rico Renewable Energy Project, issued on April 10, 2017 and the EPA Public Announcement for Final PSD Permit Extension for Energy Answers Arecibo, PR.

  3. The TRIPOD e-learning Platform for the Training of Earthquake Safety Assessment

    NASA Astrophysics Data System (ADS)

    Coppari, S.; Di Pasquale, G.; Goretti, A.; Papa, F.; Papa, S.; Paoli, G.; Pizza, A. G.; Severino, M.

    2008-07-01

    The paper summarizes the results of the in progress EU Project titled TRIPOD (Training Civil Engineers on Post-Earthquake Safety Assessment of Damaged Buildings), funded under the Leonardo Da Vinci program. The main theme of the project is the development of a methodology and a learning platform for the training of technicians involved in post-earthquake building safety inspections. In the event of a catastrophic earthquake, emergency building inspections constitute a major undertaking with severe social impact. Given the inevitable chaotic conditions and the urgent need of a great number of specialized individuals to carry out inspections, past experience indicates that inspection teams are often formed in an adhoc manner, under stressful conditions, at a varying levels of technical expertise and experience, sometime impairing the reliability and consistency of the inspection results. Furthermore each Country has its own building damage and safety assessment methodology, developed according to its experience, laws, building technology and seismicity. This holds also for the partners participating to the project (Greece, Italy, Turkey, Cyprus), that all come from seismically sensitive Mediterranean countries. The project aims at alleviating the above shortcomings by designing and developing a training methodology and e-platform, forming a complete training program targeted at inspection engineers, specialized personnel and civil protection agencies. The e-learning platform will provide flexible and friendly authoring mechanisms, self-teaching and assessment capabilities, course and trainee management, etc. Courses will be also made available as stand-alone multimedia applications on CD and in the form of a complete pocket handbook. Moreover the project will offer the possibility of upgrading different experiences and practices: a first step towards the harmonization of methodologies and tools of different Countries sharing similar problems. Finally, through wide

  4. Fairfax Alcohol Safety Action Project second year evaluation summary : a report prepared by the Virginia Highway and Transportation Research Council under the sponsorship of the Highway Safety Division of Virginia.

    DOT National Transportation Integrated Search

    1974-01-01

    The Fairfax Alcohol Safety Action Project (ASAP) was begun in January 1972 as one of thirty-five federally funded demonstration projects designed to implement and evaluate a comprehensive community alcohol countermeasures program. The Fairfax ASAP wa...

  5. Parent Attitudes Toward the Virginia Beach Year-Round School Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Schlechty, Phillip C.

    Part of the Virginia Beach year-round school program evaluation, this final report contains a detailed analysis of parental attitudes, beliefs, and perceptions. The data leads to the following conclusions: a majority (53.3 percent) of parents are dubious or negative toward the 45-15 pilot project; a slight majority of parents in the pilot schools…

  6. Roadway safety analysis methodology for Utah : final report.

    DOT National Transportation Integrated Search

    2016-12-01

    This research focuses on the creation of a three-part Roadway Safety Analysis methodology that applies and automates the cumulative work of recently-completed roadway safety research. The first part is to prepare the roadway and crash data for analys...

  7. Safety of railroad passenger vehicle dynamics : final summary report

    DOT National Transportation Integrated Search

    2002-07-01

    This report is a summary of all the work done by Foster-Miller on the passenger rail vehicle dynamic safety under the contract awarded by the FRA. The report presents key issues and findings in the safety assessments and a safety assessment methodolo...

  8. Career Awareness Program for Bilingual Haitian and Hispanic Students (Project CAP). Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    Roman, Elliott M.

    In 1993-94 the Career Awareness Program for Bilingual Haitian and Hispanic Students (Project CAP) was in its fifth and final year as an Elementary and Secondary Education Act Title VII project. Project CAP operated at two high schools in Brooklyn (New York), serving 136 Haitians at one and an undetermined number of Spanish-speaking and Haitian…

  9. 78 FR 57066 - Final Waivers and Extensions of Project Periods; American Indian Vocational Rehabilitation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ...) Number: 84.250C and 84.250D] Final Waivers and Extensions of Project Periods; American Indian Vocational... assistance in order to provide vocational rehabilitation services to American Indians with disabilities... program is funded through a set-aside of the funds appropriated for the Vocational Rehabilitation (VR...

  10. A Fire Safety Certification System for Board and Care Operators and Staff. SBIR Phase II: Final Report.

    ERIC Educational Resources Information Center

    Walker, Bonnie L.

    This report describes Phase II of a project which developed a system for delivering fire safety training to board and care providers who serve adults with developmental disabilities. Phase II focused on developing and pilot testing a "train the trainers" workshop for instructors and field testing the provider's workshop. Evaluation of…

  11. New Entrant Safety Research. Final Report.

    DOT National Transportation Integrated Search

    1998-04-23

    This report documents a study of the safety performance and compliance of motor carriers entering interstate service, i.e., new entrants, and the possible need for a new entrant prequalification and monitoring program. The study was conducted by the ...

  12. Systems Analysis of NASA Aviation Safety Program: Final Report

    NASA Technical Reports Server (NTRS)

    Jones, Sharon M.; Reveley, Mary S.; Withrow, Colleen A.; Evans, Joni K.; Barr, Lawrence; Leone, Karen

    2013-01-01

    A three-month study (February to April 2010) of the NASA Aviation Safety (AvSafe) program was conducted. This study comprised three components: (1) a statistical analysis of currently available civilian subsonic aircraft data from the National Transportation Safety Board (NTSB), the Federal Aviation Administration (FAA), and the Aviation Safety Information Analysis and Sharing (ASIAS) system to identify any significant or overlooked aviation safety issues; (2) a high-level qualitative identification of future safety risks, with an assessment of the potential impact of the NASA AvSafe research on the National Airspace System (NAS) based on these risks; and (3) a detailed, top-down analysis of the NASA AvSafe program using an established and peer-reviewed systems analysis methodology. The statistical analysis identified the top aviation "tall poles" based on NTSB accident and FAA incident data from 1997 to 2006. A separate examination of medical helicopter accidents in the United States was also conducted. Multiple external sources were used to develop a compilation of ten "tall poles" in future safety issues/risks. The top-down analysis of the AvSafe was conducted by using a modification of the Gibson methodology. Of the 17 challenging safety issues that were identified, 11 were directly addressed by the AvSafe program research portfolio.

  13. Educational Alternatives for Boating Safety Programs. Final Report.

    ERIC Educational Resources Information Center

    Sager, E.; And Others

    The Coast Guard, in efforts to improve the safety of recreational boating, undertook research to identify educational alternatives in boating safety programs. Background research was done to assess materials from areas of boating education and education in comparable recreational areas. Research was also conducted to review educational and mass…

  14. UCSD Performance in the Edge Plasma Simulation (EPSI) Project. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tynan, George Robert

    This report contains a final report on the activities of UC San Diego PI G.R. Tynan and his collaborators as part of the EPSI Project, that was led by Dr. C.S. Chang, from PPPL. As a part of our work, we carried out several experiments on the ALCATOR C-­MOD tokamak device, aimed at unraveling the “trigger” or cause of the spontaneous transition from low-­mode confinement (L-­mode) to high confinement (H-­mode) that is universally observed in tokamak devices, and is planned for use in ITER.

  15. Vocational Evaluation and Work Adjustment Bulletin; Vol. 8, Special Edition: Vocational Evaluation Project Final Report Part 2.

    ERIC Educational Resources Information Center

    Vocational Evaluation and Work Adjustment Association, Washington, DC.

    Part 2 of the three-part Vocational Evaluation Project final report contains brief summaries of the seven task force report which comprise the final report and two such task force reports. The report of task force 5, Standards for Vocational Evaluation, describes the task force's effort to study the standards for accreditation presently used by…

  16. California Hydrogen Infrastructure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heydorn, Edward C

    2013-03-12

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The projectmore » also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling

  17. Analysis of Aviation Safety Reporting System Incident Data Associated with the Technical Challenges of the Atmospheric Environment Safety Technology Project

    NASA Technical Reports Server (NTRS)

    Withrow, Colleen A.; Reveley, Mary S.

    2014-01-01

    This study analyzed aircraft incidents in the NASA Aviation Safety Reporting System (ASRS) that apply to two of the three technical challenges (TCs) in NASA's Aviation Safety Program's Atmospheric Environment Safety Technology Project. The aircraft incidents are related to airframe icing and atmospheric hazards TCs. The study reviewed incidents that listed their primary problem as weather or environment-nonweather between 1994 and 2011 for aircraft defined by Federal Aviation Regulations (FAR) Parts 121, 135, and 91. The study investigated the phases of flight, a variety of anomalies, flight conditions, and incidents by FAR part, along with other categories. The first part of the analysis focused on airframe-icing-related incidents and found 275 incidents out of 3526 weather-related incidents over the 18-yr period. The second portion of the study focused on atmospheric hazards and found 4647 incidents over the same time period. Atmospheric hazards-related incidents included a range of conditions from clear air turbulence and wake vortex, to controlled flight toward terrain, ground encounters, and incursions.

  18. Occupational health and safety in the Moroccan construction sites: preliminary diagnosis

    NASA Astrophysics Data System (ADS)

    Tarik, Bakeli; Adil, Hafidi Alaoui

    2018-05-01

    Managing occupational health and safety on Moroccan construction sector represents the first step for projects' success. In fact, by avoiding accidents, all the related direct and indirect costs and delays can be prevented. That leads to an important question always asked by any project manager: what are the factors responsible for accidents? How can they be avoided? Through this research, the aim is to go through these questions, to contribute in occupational health and safety principles understanding, to identify construction accidentology and risk management opportunities and to approach the case of Moroccan construction sites by an accurate diagnosis. The approach is to make researchers, managers, stakeholders and deciders aware about the criticality of construction sites health and safety situation. And, to do the first step for a scientific research project in relation with health and safety in the Moroccan construction sector. For this, the paper will study the related state of art namely about construction sites accidents causation, and will focus on Reason's `Swiss cheese' model and its utilization for Moroccan construction sites health and safety diagnosis. The research will end with an estimation of an accidents fatality rate in the Moroccan construction sector and a benchmarking with the international rates. Finally, conclusions will be presented about the necessity of Occupational Health and Safety Management System (OHSMS) implementation, which shall cover all risk levels, and insure, at the same time, that the necessary defenses against accidents are on place.

  19. Local police enforcement, public information and education strategies to foster more and proper use of child safety seats by toddlers : evaluation of a demonstration project

    DOT National Transportation Integrated Search

    1994-03-01

    This project evaluated the effects of enforcing safety belt (SB)/child safety seat (CSS) laws and providing public information and education (PI&E) about the laws and use and proper use of CSSs--without external funding. Project goals focused on incr...

  20. Verification and Implementation of Operations Safety Controls for Flight Missions

    NASA Technical Reports Server (NTRS)

    Smalls, James R.; Jones, Cheryl L.; Carrier, Alicia S.

    2010-01-01

    There are several engineering disciplines, such as reliability, supportability, quality assurance, human factors, risk management, safety, etc. Safety is an extremely important engineering specialty within NASA, and the consequence involving a loss of crew is considered a catastrophic event. Safety is not difficult to achieve when properly integrated at the beginning of each space systems project/start of mission planning. The key is to ensure proper handling of safety verification throughout each flight/mission phase. Today, Safety and Mission Assurance (S&MA) operations engineers continue to conduct these flight product reviews across all open flight products. As such, these reviews help ensure that each mission is accomplished with safety requirements along with controls heavily embedded in applicable flight products. Most importantly, the S&MA operations engineers are required to look for important design and operations controls so that safety is strictly adhered to as well as reflected in the final flight product.

  1. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  2. Expanding the Circle: South Dakota Deaf-Blind Project. Final Report, 10-1-98 through 9-30-99.

    ERIC Educational Resources Information Center

    South Dakota State Dept. of Education and Cultural Affairs, Pierre.

    This final report describes activities and accomplishments of the South Dakota Deaf-Blind Project, a 4-year federally funded project designed to raise awareness of the need for early identification of children who are deaf-blind and reside on Native American reservation lands. To this end, the states of Montana, Minnesota, North Dakota, Nebraska,…

  3. Harmony in Career Learning and Scholastic System (Project HI-CLASS). Final Evaluation Report 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Duque, Diana L.

    Harmony in Career Learning and Scholastic System (Project HI-CLASS) was a Transitional Bilingual Education Title VII-funded program in its fifth and final year in 1992-93. The project offered instructional and support services to 641 students of limited English proficiency (LEP) at three sites, all of which had many immigrant students, in…

  4. Africa road safety review : final report

    DOT National Transportation Integrated Search

    2000-12-01

    A number of studies of road crashes worldwide (Jacobs et al, 2000) carried out by TRL in : recent years have shown that the road safety situation throughout the African continent is one : of the worst in the world. With approximately only 4 per cent ...

  5. President's Child Safety Partnership. Final Report.

    ERIC Educational Resources Information Center

    President's Commission on Child Safety Partnership, Washington, DC.

    This report presents the findings and recommendations from the President's Child Safety Partnership, a group of citizens representing business, private nonprofit groups, the government, and private individuals appointed by President Reagan to gather accurate information about the nature and extent of violence against children and to identify…

  6. Pathways to Practice. A Series of Final Reports on the SREB Nursing Curriculum Project.

    ERIC Educational Resources Information Center

    Haase, Patricia T.

    Five final reports on the Nursing Curriculum Project of the Southern Regional Education Board are presented. The reports include (1) RN (Registered Nursing) Education: The Basic Issues; (2) Types of RN Programs; (3) Planning and Operating an RN Program; (4) Acclimating the Novice Nurse: Whose Responsibility? and (5) Statewide Planning for Nursing.…

  7. Software Safety Analysis of a Flight Guidance System

    NASA Technical Reports Server (NTRS)

    Butler, Ricky W. (Technical Monitor); Tribble, Alan C.; Miller, Steven P.; Lempia, David L.

    2004-01-01

    This document summarizes the safety analysis performed on a Flight Guidance System (FGS) requirements model. In particular, the safety properties desired of the FGS model are identified and the presence of the safety properties in the model is formally verified. Chapter 1 provides an introduction to the entire project, while Chapter 2 gives a brief overview of the problem domain, the nature of accidents, model based development, and the four-variable model. Chapter 3 outlines the approach. Chapter 4 presents the results of the traditional safety analysis techniques and illustrates how the hazardous conditions associated with the system trace into specific safety properties. Chapter 5 presents the results of the formal methods analysis technique model checking that was used to verify the presence of the safety properties in the requirements model. Finally, Chapter 6 summarizes the main conclusions of the study, first and foremost that model checking is a very effective verification technique to use on discrete models with reasonable state spaces. Additional supporting details are provided in the appendices.

  8. Trends in drinking-driving at night : a comparison of the four roadside surveys of the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1975-01-01

    As part of the Fairfax Alcohol Safety Action Project (ASAP), staff members of the Virginia. Highway and Transportation Research Council, acting in their role as evaluators of the project, have conducted four nighttime roadside surveys in Fairfax, Vir...

  9. Occupational injury and illness recording and reporting requirements. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final rule.

    PubMed

    2001-01-19

    The Occupational Safety and Health Administration (OSHA) is revising its rule addressing the recording and reporting of occupational injuries and illnesses (29 CFR parts 1904 and 1952), including the forms employers use to record those injuries and illnesses. The revisions to the final rule will produce more useful injury and illness records, collect better information about the incidence of occupational injuries and illnesses on a national basis, promote improved employee awareness and involvement in the recording and reporting of job-related injuries and illnesses, simplify the injury and illness recordkeeping system for employers, and permit increased use of computers and telecommunications technology for OSHA recordkeeping purposes. This rulemaking completes a larger overall effort to revise Part 1904 of Title 29 of the Code of Federal Regulations. Two sections of Part 1904 have already been revised in earlier rulemakings. A rule titled Reporting fatalities and multiple hospitalization incidents to OSHA, became effective May 2, 1994 and has been incorporated into this final rule as Section 1904.39. A second rule entitled Annual OSHA injury and illness survey of ten or more employers became effective on March 13, 1997 and has been incorporated into this final rule as Section 1904.41. The final rule being published today also revises 29 CFR 1952.4, Injury and Illness Recording and Reporting Requirements, which prescribes the recordkeeping and reporting requirements for States that have an occupational safety and health program approved by OSHA under Section 18 of the Occupational Safety and Health Act (the "Act" or "OSH Act").

  10. NASA's Software Safety Standard

    NASA Technical Reports Server (NTRS)

    Ramsay, Christopher M.

    2007-01-01

    NASA relies more and more on software to control, monitor, and verify its safety critical systems, facilities and operations. Since the 1960's there has hardly been a spacecraft launched that does not have a computer on board that will provide command and control services. There have been recent incidents where software has played a role in high-profile mission failures and hazardous incidents. For example, the Mars Orbiter, Mars Polar Lander, the DART (Demonstration of Autonomous Rendezvous Technology), and MER (Mars Exploration Rover) Spirit anomalies were all caused or contributed to by software. The Mission Control Centers for the Shuttle, ISS, and unmanned programs are highly dependant on software for data displays, analysis, and mission planning. Despite this growing dependence on software control and monitoring, there has been little to no consistent application of software safety practices and methodology to NASA's projects with safety critical software. Meanwhile, academia and private industry have been stepping forward with procedures and standards for safety critical systems and software, for example Dr. Nancy Leveson's book Safeware: System Safety and Computers. The NASA Software Safety Standard, originally published in 1997, was widely ignored due to its complexity and poor organization. It also focused on concepts rather than definite procedural requirements organized around a software project lifecycle. Led by NASA Headquarters Office of Safety and Mission Assurance, the NASA Software Safety Standard has recently undergone a significant update. This new standard provides the procedures and guidelines for evaluating a project for safety criticality and then lays out the minimum project lifecycle requirements to assure the software is created, operated, and maintained in the safest possible manner. This update of the standard clearly delineates the minimum set of software safety requirements for a project without detailing the implementation for those

  11. Near Real-Time Surveillance for Influenza Vaccine Safety: Proof-of-Concept in the Vaccine Safety Datalink Project

    PubMed Central

    Greene, Sharon K.; Kulldorff, Martin; Lewis, Edwin M.; Li, Rong; Yin, Ruihua; Weintraub, Eric S.; Fireman, Bruce H.; Lieu, Tracy A.; Nordin, James D.; Glanz, Jason M.; Baxter, Roger; Jacobsen, Steven J.; Broder, Karen R.; Lee, Grace M.

    2010-01-01

    The emergence of pandemic H1N1 influenza in 2009 has prompted public health responses, including production and licensure of new influenza A (H1N1) 2009 monovalent vaccines. Safety monitoring is a critical component of vaccination programs. As proof-of-concept, the authors mimicked near real-time prospective surveillance for prespecified neurologic and allergic adverse events among enrollees in 8 medical care organizations (the Vaccine Safety Datalink Project) who received seasonal trivalent inactivated influenza vaccine during the 2005/06–2007/08 influenza seasons. In self-controlled case series analysis, the risk of adverse events in a prespecified exposure period following vaccination was compared with the risk in 1 control period for the same individual either before or after vaccination. In difference-in-difference analysis, the relative risk in exposed versus control periods each season was compared with the relative risk in previous seasons since 2000/01. The authors used Poisson-based analysis to compare the risk of Guillian-Barré syndrome following vaccination in each season with that in previous seasons. Maximized sequential probability ratio tests were used to adjust for repeated analyses on weekly data. With administration of 1,195,552 doses to children under age 18 years and 4,773,956 doses to adults, no elevated risk of adverse events was identified. Near real-time surveillance for selected adverse events can be implemented prospectively to rapidly assess seasonal and pandemic influenza vaccine safety. PMID:19965887

  12. Smart Gun Technology project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiss, D.R.

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness inmore » models of a smart firearm.« less

  13. Final Technical Report of Project DE-FG02-96ER14647

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lundeen, Stephen R.

    This is the final technical report of work completed under DOE support over the period Sept. 1, 1996 until May 31, 2015. The title of the project was "Ion/Excited Atom Collision Studies with a Rydberg Target and a CO2 Laser" from 9/1/96 to 10/31/06, and "Properties of Actinide Ions from Measurements of Rydberg Ion Fine Structure" from 11/1/06 until 5/31/15. The primary technical results were a detailed experimental study of resonant charge transfer between Rydberg atoms and highly-charged ions, and unique measurements of many properties of multiply-charged Thorium ions.

  14. Are automatic systems the future of motorcycle safety? A novel methodology to prioritize potential safety solutions based on their projected effectiveness.

    PubMed

    Gil, Gustavo; Savino, Giovanni; Piantini, Simone; Baldanzini, Niccolò; Happee, Riender; Pierini, Marco

    2017-11-17

    Motorcycle riders are involved in significantly more crashes per kilometer driven than passenger car drivers. Nonetheless, the development and implementation of motorcycle safety systems lags far behind that of passenger cars. This research addresses the identification of the most effective motorcycle safety solutions in the context of different countries. A knowledge-based system of motorcycle safety (KBMS) was developed to assess the potential for various safety solutions to mitigate or avoid motorcycle crashes. First, a set of 26 common crash scenarios was identified from the analysis of multiple crash databases. Second, the relative effectiveness of 10 safety solutions was assessed for the 26 crash scenarios by a panel of experts. Third, relevant information about crashes was used to weigh the importance of each crash scenario in the region studied. The KBMS method was applied with an Italian database, with a total of more than 1 million motorcycle crashes in the period 2000-2012. When applied to the Italian context, the KBMS suggested that automatic systems designed to compensate for riders' or drivers' errors of commission or omission are the potentially most effective safety solution. The KBMS method showed an effective way to compare the potential of various safety solutions, through a scored list with the expected effectiveness of each safety solution for the region to which the crash data belong. A comparison of our results with a previous study that attempted a systematic prioritization of safety systems for motorcycles (PISa project) showed an encouraging agreement. Current results revealed that automatic systems have the greatest potential to improve motorcycle safety. Accumulating and encoding expertise in crash analysis from a range of disciplines into a scalable and reusable analytical tool, as proposed with the use of KBMS, has the potential to guide research and development of effective safety systems. As the expert assessment of the crash

  15. Potential difficulties in applying the Pay for Safety Scheme (PFSS) in construction projects.

    PubMed

    Choi, Tracy N Y; Chan, Daniel W M; Chan, Albert P C

    2012-09-01

    Since 1996, the Government of the Hong Kong Special Administrative Region (HKSAR) has introduced the Pay for Safety Scheme (PFSS) to the public works construction contracts to uplift their safety performance. However, the adoption of PFSS has also encountered some difficulties that merit considerable attention. This paper purports to provide a concise review of the prevailing application of PFSS in Hong Kong in general, and to explore the potential difficulties associated with PFSS in particular. By means of an empirical questionnaire survey geared towards industrial practitioners with extensive direct hands-on PFSS experience, their opinions were solicited, analyzed and compared between the client group and contractor group of respondents. The three most significant difficulties in implementing PFSS were found to be: (1) "Plenty of paperwork required for certifying payment to contractor"; (2) "Complicated contract documents and lengthy assessment process"; and (3) "Over-tight project schedule requiring rush jobs". The output of this research study is particularly essential in assisting the contracting parties to mitigate the avoidable hindrances when embarking on PFSS. It has also generated valuable insights into developing effective recommendations for alleviating the barriers to PFSS success for future construction projects. Copyright © 2011 Elsevier Ltd. All rights reserved.

  16. Connecticut Biodiesel Power Generation Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grannis, Lee; York, Carla R.

    Sabre will continue support of the emissions equipment and VARS issues to ensure all are resolved and the system is functioning as expected. The remote data collection to become more automated. Final project reports for data collection and system performance to be generated. Sabre continued to support the emissions equipment and VARS issues to ensure all are resolved and the system is functioning as expected. The remote data collection became more automated. Final project reports for data collection and system performance were generated and are part of this final report. Some Systems Sensors were replaced due to a lightning strike.more » Sample data charts are shown at the end of the report. During the project, Sabre Engineering provided support to the project team with regarding to troubleshooting technical issues and system integration with the local power utility company. The resulting lessons learned through Sabre’s participation in the project have been valuable to the integrity of the data collected as well as in providing BioPur Light & Power valuable insights into future operations and planning for possible expansion. The system monitoring and data collection system has been operating as designed and continues to provide relevant information to the system operators. The information routinely gathered automatically by the system also contributes to the REN and REC validations which are required to secure credit for these items. During the quarter, the remaining work on the operations and safety manual were completed and released for publication after screen shots were verified. The goal of this effort to provide an accurate set of precautions and procedures for the technology system that can be replicated to other similar system.« less

  17. United States Coast Guard Configuration Management Plan (CMP) for the Ports and Waterways Safety System (PAWSS) Project

    DOT National Transportation Integrated Search

    1997-01-01

    Prepared ca. 1997. The Configuration Management Plan (CMP) provides configuration management instructions and guidance for the Vessel Traffic Service (VTS) system of the Ports and Waterways Safety System (PAWSS) project. The CMP describes in detail t...

  18. Automated metadata--final project report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schissel, David

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO projectmore » was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project’s toolkit. Feedback was very positive on the project’s toolkit and the value of such automatic workflow documentation to the scientific endeavor.« less

  19. Urban and suburban arterial safety performance functions : final report.

    DOT National Transportation Integrated Search

    2016-06-30

    This report documents findings from a comprehensive set of safety performance functions developed for the entire urban-suburban : arterial road segment system on the state highway system in Washington. Conventional urban suburban safety performance :...

  20. Interactive Peer Coaching/Mentoring Project for Preparing Teachers of Students with Severe Behavioral Disorders Final Report. Volume 1: Project Narrative and Briefing Papers [and] Volume 2: Appendices.

    ERIC Educational Resources Information Center

    North Dakota Center for Persons with Disabilities, Minot.

    This final report discusses the activities and outcomes of the Interactive Peer Coaching/Mentoring (IPCM) Project, a program designed to prepare teachers of students with severe behavioral disorders (SED) residing in a rural, remote area in North Dakota. The IPCM project was conducted from July 1997 through July 2000 and developed an…

  1. Project Gel a Randomized Rectal Microbicide Safety and Acceptability Study in Young Men and Transgender Women

    PubMed Central

    Cranston, Ross D.; Mayer, Kenneth H.; Febo, Irma; Duffill, Kathryn; Siegel, Aaron; Engstrom, Jarret C.; Nikiforov, Alexyi; Park, Seo-Young; Brand, Rhonda M.; Jacobson, Cindy; Giguere, Rebecca; Dolezal, Curtis; Frasca, Timothy; Leu, Cheng-Shiun; Schwartz, Jill L.; Carballo-Diéguez, Alex

    2016-01-01

    Objectives The purpose of Project Gel was to determine the safety and acceptability of rectal microbicides in young men who have sex with men (MSM) and transgender women (TGW) at risk of HIV infection. Methods MSM and TGW aged 18–30 years were enrolled at three sites; Pittsburgh, PA; Boston, MA; and San Juan, PR. Stage 1A was a cross-sectional assessment of sexual health and behavior in MSM and TGW. A subset of participants from Stage 1A were then enrolled in Stage 1B, a 12-week evaluation of the safety and acceptability of a placebo rectal gel. This was followed by the final phase of the study (Stage 2) in which a subset of participants from Stage 1B were enrolled into a Phase 1 rectal safety and acceptability evaluation of tenofovir (TFV) 1% gel. Results 248 participants were enrolled into Stage 1A. Participants’ average age was 23.3 years. The most common sexually transmitted infection (STIs) at baseline were Herpes simplex (HSV)-2 (16.1% by serology) and rectal Chlamydia trachomatis (CT) (10.1% by NAAT). 134 participants were enrolled into Stage 1B. During the 12 week period of follow-up 2 HIV, 5 rectal CT, and 5 rectal Neisseria gonorrhea infections were detected. The majority of adverse events (AEs) were infections (N = 56) or gastrointestinal (N = 46) and were mild (69.6%) or moderate (28.0%). Of the participants who completed Stage 1B, 24 were enrolled into Stage 2 and randomized (1:1) to receive TFV or placebo gel. All participants completed Stage 2. The majority of AEs were gastrointestinal (N = 10) and of mild (87.2%) or moderate (10.3%) severity. Conclusions In this study we were able to enroll a sexually active population of young MSM and TGW who were willing to use rectal microbicides. TFV gel was safe and acceptable and should be further developed as an alternative HIV prevention intervention for this population. Trial Registration ClinicalTrials.gov NCT01283360 PMID:27362788

  2. Final Status Survey for the Largest Decommissioning Project on Earth

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dubiel, R.W.; Miller, J.; Quayle, D.

    2006-07-01

    To assist the United States Department of Energy's (US DOE's) re-industrialization efforts at its gaseous diffusion site in Oak Ridge, Tennessee, known as the East Tennessee Technology Park (ETTP), the US DOE awarded a 6-year Decontamination and Decommissioning (D and D) contract to BNG America (formerly BNFL Inc.) in 1997. The ETTP 3-Building D and D Project included the removal and disposition of the materials and equipment from the K-33, K-31, and K-29 Gaseous Diffusion Plant buildings. The three buildings comprise more than 4.8 million square feet (446,000 square meters) of floor surface area and more than 350 million poundsmore » (148 million kilograms) of hazardous and radioactively contaminated material, making it the largest nuclear D and D project in progress anywhere in the world. The logistical hurdles involved in a project of this scope and magnitude required an extensive amount of Engineering and Health Physics professionals. In order to accomplish the Final Status Survey (FSS) for a project of this scope, the speed and efficiency of automated survey equipment was essential. Surveys of floors, structural steel and ceilings up to 60 feet (18 meters) were required. The FSS had to be expanded to include additional remediation and surveys due to characterization surveys and assumptions regarding the nature and extent of contamination provided by the US DOE. Survey design and technical bases had to consider highly variable constituents; including uranium from depleted to low enrichment, variable levels of Technetium-99 and transuranic nuclides, which were introduced into the cascade during the 1960's when recycled uranium (RU) from Savannah River was re-enriched at the facility. The RU was transported to unexpected locations from leaks in the cascade by complex building ventilation patterns. The primary survey tool used for the post remediation and FSS was the Surface Contamination Monitor (SCM) and the associated Survey Information Management System

  3. Teleretinal screening for diabetic retinopathy in six Los Angeles urban safety-net clinics: final study results.

    PubMed

    Ogunyemi, Omolola; George, Sheba; Patty, Lauren; Teklehaimanot, Senait; Baker, Richard

    2013-01-01

    In a previous paper, we presented initial findings from a study on the feasibility and challenges of implementing teleretinal screening for diabetic retinopathy in an urban safety net setting facing eyecare specialist shortages. This paper presents some final results from that study, which involved six South Los Angeles safety net clinics. A total of 2,732 unique patients were screened for diabetic retinopathy by three ophthalmologist readers, with 1035 receiving a recommendation for referral to specialty care. Referrals included 48 for proliferative diabetic retinopathy, 115 for severe non-proliferative diabetic retinopathy (NPDR), 247 for moderate NPDR, 246 for mild NPDR, 97 for clinically significant macular edema, and 282 for a non-diabetic condition, such as glaucoma. Image quality was also assessed, with ophthalmologist readers grading 4% to 13% of retinal images taken at the different clinics as being inadequate for any diagnostic interpretation.

  4. Final safety analysis report for the Galileo Mission: Volume 2, Book 2: Accident model document: Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-12-15

    This section of the Accident Model Document (AMD) presents the appendices which describe the various analyses that have been conducted for use in the Galileo Final Safety Analysis Report II, Volume II. Included in these appendices are the approaches, techniques, conditions and assumptions used in the development of the analytical models plus the detailed results of the analyses. Also included in these appendices are summaries of the accidents and their associated probabilities and environment models taken from the Shuttle Data Book (NSTS-08116), plus summaries of the several segments of the recent GPHS safety test program. The information presented in thesemore » appendices is used in Section 3.0 of the AMD to develop the Failure/Abort Sequence Trees (FASTs) and to determine the fuel releases (source terms) resulting from the potential Space Shuttle/IUS accidents throughout the missions.« less

  5. Final project report for NEET pulsed ion beam project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kucheyev, S. O.

    The major goal of this project was to develop and demonstrate a novel experimental approach to access the dynamic regime of radiation damage formation in nuclear materials. In particular, the project exploited a pulsed-ion-beam method in order to gain insight into defect interaction dynamics by measuring effective defect interaction time constants and defect diffusion lengths. This project had the following four major objectives: (i) the demonstration of the pulsed ion beam method for a prototypical nuclear ceramic material, SiC; (ii) the evaluation of the robustness of the pulsed beam method from studies of defect generation rate effects; (iii) the measurementmore » of the temperature dependence of defect dynamics and thermally activated defect-interaction processes by pulsed ion beam techniques; and (iv) the demonstration of alternative characterization techniques to study defect dynamics. As we describe below, all these objectives have been met.« less

  6. The TRIPOD e-learning Platform for the Training of Earthquake Safety Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coppari, S.; Di Pasquale, G.; Goretti, A.

    2008-07-08

    The paper summarizes the results of the in progress EU Project titled TRIPOD (Training Civil Engineers on Post-Earthquake Safety Assessment of Damaged Buildings), funded under the Leonardo Da Vinci program. The main theme of the project is the development of a methodology and a learning platform for the training of technicians involved in post-earthquake building safety inspections. In the event of a catastrophic earthquake, emergency building inspections constitute a major undertaking with severe social impact. Given the inevitable chaotic conditions and the urgent need of a great number of specialized individuals to carry out inspections, past experience indicates that inspectionmore » teams are often formed in an adhoc manner, under stressful conditions, at a varying levels of technical expertise and experience, sometime impairing the reliability and consistency of the inspection results. Furthermore each Country has its own building damage and safety assessment methodology, developed according to its experience, laws, building technology and seismicity. This holds also for the partners participating to the project (Greece, Italy, Turkey, Cyprus), that all come from seismically sensitive Mediterranean countries. The project aims at alleviating the above shortcomings by designing and developing a training methodology and e-platform, forming a complete training program targeted at inspection engineers, specialized personnel and civil protection agencies. The e-learning platform will provide flexible and friendly authoring mechanisms, self-teaching and assessment capabilities, course and trainee management, etc. Courses will be also made available as stand-alone multimedia applications on CD and in the form of a complete pocket handbook. Moreover the project will offer the possibility of upgrading different experiences and practices: a first step towards the harmonization of methodologies and tools of different Countries sharing similar problems. Finally, through

  7. Hispanic Vocational Exploration Project. Final Report.

    ERIC Educational Resources Information Center

    Centro De La Comunidad, Inc., New London, CT.

    During its second year, the Hispanic Vocational Exploration Project recruited eighth and ninth grade Hispanic youth for a four-week cycle, after-school, career exploratory program at Southeastern Regional Vocational Technical School, Groton, Connecticut. A series of career education workshops was the other major project activity. Supportive…

  8. Operational and safety characteristics of lane widths : final report.

    DOT National Transportation Integrated Search

    2015-01-15

    The primary goal of this study was to investigate and assess the effect of lane widths on the safety and : operation of highways in South Carolina. Because of the many site conditions that affect safety and : operations on roadways, this type of rese...

  9. ADD Special Projects Grant. Final Report.

    ERIC Educational Resources Information Center

    Wortham, Jocelyn F.

    The purpose of this five-year project was to prepare administrators, general and special education teachers, and parents to meet the needs of children with attention deficit hyperactivity disorders (ADHD). The project developed five self-instructional ADHD inservice preparation manuals for national and state dissemination and implemented an ADHD…

  10. Special Education Teacher Computer Literacy Training. Project STEEL. A Special Project To Develop and Implement a Computer-Based Special Teacher Education and Evaluation Laboratory. Volume II. Final Report.

    ERIC Educational Resources Information Center

    Frick, Theodore W.; And Others

    The document is part of the final report on Project STEEL (Special Teacher Education and Evaluation Laboratory) intended to extend the utilization of technology in the training of preservice special education teachers. This volume focuses on the second of four project objectives, the development of a special education teacher computer literacy…

  11. Optimization of safety on pavement preservation projects.

    DOT National Transportation Integrated Search

    2011-01-01

    To achieve a goal of reducing highway crash fatalities by 4% each year to improve roadway safety, the Georgia Department of Transportation (GDOT) is actively seeking opportunities to incorporate safety improvements into its current pavement preservat...

  12. Multilevel Evaluation Systems Project. Final Report.

    ERIC Educational Resources Information Center

    Herman, Joan L.

    Several studies were conducted in 1987 by the Multilevel Evaluation Systems Project, which focuses on developing a model for a multi-purpose, multi-user evaluation system to facilitate educational decision making and evaluation. The project model emphasizes on-going integrated assessment of individuals, classes, and programs using a variety of…

  13. PROJECT PATS: "Potentially Academically Talented Students." Final Technical Report, 10/1/80-6/30/82.

    ERIC Educational Resources Information Center

    Pfeffer, J. S.; And Others

    The final report describes a 2-year pilot project to identify and program for disadvantaged potentially gifted students in grades 5-8. Two goals of the program are stated: (1) to establish a working partnership among public and nonpublic schools and higher education; and (2) to integrate disadvantaged potentially gifted with nondisadvantaged…

  14. Key outcomes and addressing remaining challenges--perspectives from a final evaluation of the China GAVI project.

    PubMed

    Yang, Weizhong; Liang, Xiaofeng; Cui, Fuqiang; Li, Li; Hadler, Stephen C; Hutin, Yvan J; Kane, Mark; Wang, Yu

    2013-12-27

    During the China GAVI project, implemented between 2002 and 2010, more than 25 million children received hepatitis B vaccine with the support of project, and the vaccine proved to be safe and effective. With careful consideration for project savings, China and GAVI continually adjusted the budget, additionally allowing the project to spend operational funds to support demonstration projects to improve timely birth dose (TBD), conduct training of EPI staff, and to monitor the project impact. Results from the final evaluation indicated the achievement of key outcomes. As a result of government co-investment, human resources at county level engaged in hepatitis B vaccination increased from 29 per county on average in 2002 to 66 in 2009. All project counties funded by the GAVI project use auto-disable syringes for hepatitis B vaccination and other vaccines. Surveyed hepatitis B vaccine coverage increased from 71% in 2002 to 93% in 2009 among infants. The HBsAg prevalence declined from 9.67% in 1992 to 0.96% in 2006 among children under 5 years of age. However, several important issues remain: (1) China still accounts for the largest annual number of perinatal HBV infections (estimated 84,121) in the WHO WPR region; (2) China still lacks a clear national policy for safe injection of vaccines; (3) vaccination of high risk adults and protection of health care workers are still not implemented; (4) hepatitis B surveillance needs to be refined to more accurately monitor acute hepatitis B; and (5) a program for treatment of persons with chronic HBV infection is needed. Recommendations for future hepatitis B control include: using the lessons learned from the China GAVI project for future introductions of new vaccines; addressing unmet needs with a second generation hepatitis B program to reach every infant, including screening mothers, and providing HBIG for infants born to HBsAg positive mothers; expanding vaccination to high risk adults; addressing remaining unsafe

  15. Deep Bore Storage of Nuclear Waste Using MMW (Millimeter Wave) Technology. Full Project Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oglesby, Kenneth D.; Woskov, Paul; Einstein, Herbert

    This DOE Nuclear STTR project DE-SC001238 investigated the use of MMW directed energy to form rock melt and steel plugs in deep wellbores to further isolate highly radioactive nuclear waste in ultra-deep basement rocks for long term storage. This current project builds upon a prior DOE project, DE-EE0005504, which developed the basic low power, low 28 GHz frequency waveguide setup, process and instruments. This research adds to our understanding of using MMW power to melt and vaporize rocks and steel/ metals and laid plans for future higher power field prototype testing. This technology also has potential for deep well drillingmore » for nuclear storage, geothermal and oil and gas industries. It also has the potential for simultaneously sealing and securing the wellbore with a thick rock melt liner as the wellbore is drilled, called 'mono-bore drilling'. This allows for higher levels of safety and protection of the environment during deep drilling operations while providing vast cost savings. The larger purpose of this project was to find answers to key questions in developing MMW technology for its many subsurface applications.« less

  16. Project Elderly. Interim and Final Reports.

    ERIC Educational Resources Information Center

    Miami-Dade Community Coll., FL.

    This report examines Project Elderly, a project developed to provide job possibilities for the older adult in the labor market in metropolitan Miami (FL). A survey questionnaire was developed to (1) assess the opportunities of the elderly for re-entry into volunteer and paid employment positions; (2) determine the extent of the senior population…

  17. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site

  18. Automated enforcement and highway safety : final report.

    DOT National Transportation Integrated Search

    2013-11-01

    The objectives of the Automated Enforcement and Highway Safety Research study were to conduct a : literature review of national research related to the effectiveness of Red Light Camera (RLC) programs : in changing crash frequency, crash severity, cr...

  19. Risk Management of NASA Projects

    NASA Technical Reports Server (NTRS)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  20. Analysis of safety impacts of access management alternatives using the surrogate safety assessment model : final report.

    DOT National Transportation Integrated Search

    2017-06-01

    The purpose of this study was to evaluate if the Surrogate Safety Assessment Model (SSAM) could be used to assess the safety of a highway segment or an intersection in terms of the number and type of conflicts and to compare the safety effects of mul...

  1. 77 FR 30512 - Native American Career and Technical Education Program; Final Waivers and Extension of Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native American Career and Technical Education Program; Final Waivers and... American Career and Technical Education Program Catalog of Federal Domestic Assistance (CFDA) Number: 84.101A. SUMMARY: For 60-month projects funded in fiscal year (FY) 2007 under the Native American Career...

  2. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    PubMed

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  3. John Jay High School Project "RESCATE." O.E.E. Evaluation Report, 1982-1983. [Final Report.

    ERIC Educational Resources Information Center

    Friedman, Grace Ibanez; Schulman, Robert

    Project RESCATE, in its third and final year of funding, provided instruction in English as a Second Language (ESL) and native language skills, as well as bilingual instruction in science, mathematics, and social studies, to 185 Spanish-speaking students of limited English proficiency (LEP) at John Jay High School in Brooklyn, New York. In…

  4. Metropolitan Child Care Project. Final Report.

    ERIC Educational Resources Information Center

    Vartuli, Sue; Stubbs, Shirley

    A project was conducted in the metropolitan Kansas City community to assess the current state of child care needs of working parents. One project goal was to provide employers with information to help them make decisions about how much responsibility to assume for child care and which employee policies to pursue. A second goal was to assess the…

  5. Project CAREER/CAN. Final Evaluation Report.

    ERIC Educational Resources Information Center

    National Educational Evaluation Services, Inc., Chestnut Hill, MA.

    A description and evaluation of (1) the development of the 4-column process which completes the behavioral objective data base, (2) the development of the computer retrieval capability, and (3) the pilot testing of the product in high school classrooms are included in this summative evaluation of Project CAREER/CAN. (Goals of Project CAREER/CAN,…

  6. Modeling the Relationship between Safety Climate and Safety Performance in a Developing Construction Industry: A Cross-Cultural Validation Study

    PubMed Central

    Zahoor, Hafiz; Chan, Albert P. C.; Utama, Wahyudi P.; Gao, Ran; Zafar, Irfan

    2017-01-01

    This study attempts to validate a safety performance (SP) measurement model in the cross-cultural setting of a developing country. In addition, it highlights the variations in investigating the relationship between safety climate (SC) factors and SP indicators. The data were collected from forty under-construction multi-storey building projects in Pakistan. Based on the results of exploratory factor analysis, a SP measurement model was hypothesized. It was tested and validated by conducting confirmatory factor analysis on calibration and validation sub-samples respectively. The study confirmed the significant positive impact of SC on safety compliance and safety participation, and negative impact on number of self-reported accidents/injuries. However, number of near-misses could not be retained in the final SP model because it attained a lower standardized path coefficient value. Moreover, instead of safety participation, safety compliance established a stronger impact on SP. The study uncovered safety enforcement and promotion as a novel SC factor, whereas safety rules and work practices was identified as the most neglected factor. The study contributed to the body of knowledge by unveiling the deviations in existing dimensions of SC and SP. The refined model is expected to concisely measure the SP in the Pakistani construction industry, however, caution must be exercised while generalizing the study results to other developing countries. PMID:28350366

  7. Modeling the Relationship between Safety Climate and Safety Performance in a Developing Construction Industry: A Cross-Cultural Validation Study.

    PubMed

    Zahoor, Hafiz; Chan, Albert P C; Utama, Wahyudi P; Gao, Ran; Zafar, Irfan

    2017-03-28

    This study attempts to validate a safety performance (SP) measurement model in the cross-cultural setting of a developing country. In addition, it highlights the variations in investigating the relationship between safety climate (SC) factors and SP indicators. The data were collected from forty under-construction multi-storey building projects in Pakistan. Based on the results of exploratory factor analysis, a SP measurement model was hypothesized. It was tested and validated by conducting confirmatory factor analysis on calibration and validation sub-samples respectively. The study confirmed the significant positive impact of SC on safety compliance and safety participation , and negative impact on number of self-reported accidents/injuries . However, number of near-misses could not be retained in the final SP model because it attained a lower standardized path coefficient value. Moreover, instead of safety participation , safety compliance established a stronger impact on SP. The study uncovered safety enforcement and promotion as a novel SC factor, whereas safety rules and work practices was identified as the most neglected factor. The study contributed to the body of knowledge by unveiling the deviations in existing dimensions of SC and SP. The refined model is expected to concisely measure the SP in the Pakistani construction industry, however, caution must be exercised while generalizing the study results to other developing countries.

  8. Teleretinal Screening for Diabetic Retinopathy in Six Los Angeles Urban Safety-Net Clinics: Final Study Results

    PubMed Central

    Ogunyemi, Omolola; George, Sheba; Patty, Lauren; Teklehaimanot, Senait; Baker, Richard

    2013-01-01

    In a previous paper, we presented initial findings from a study on the feasibility and challenges of implementing teleretinal screening for diabetic retinopathy in an urban safety net setting facing eyecare specialist shortages. This paper presents some final results from that study, which involved six South Los Angeles safety net clinics. A total of 2,732 unique patients were screened for diabetic retinopathy by three ophthalmologist readers, with 1035 receiving a recommendation for referral to specialty care. Referrals included 48 for proliferative diabetic retinopathy, 115 for severe non-proliferative diabetic retinopathy (NPDR), 247 for moderate NPDR, 246 for mild NPDR, 97 for clinically significant macular edema, and 282 for a non-diabetic condition, such as glaucoma. Image quality was also assessed, with ophthalmologist readers grading 4% to 13% of retinal images taken at the different clinics as being inadequate for any diagnostic interpretation. PMID:24551394

  9. Alternative Youth Employment Strategies Project: Final Report.

    ERIC Educational Resources Information Center

    Sadd, Susan; And Others

    The Alternative Youth Employment Strategies (AYES) Project began as one of the demonstration projects funded under the Youth Employment and Demonstration Project Act in 1980. The program, which features three training models, is targeted toward high-risk, disadvantaged youth, especially minority youths from urban areas who had prior involvement…

  10. The PIE Institute Project: Final Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark; Carroll, Becky; Helms, Jen; Smith, Anita

    2008-01-01

    The Playful Invention and Exploration (PIE) Institute project was funded in 2005 by the National Science Foundation (NSF). For the past three years, Inverness Research has served as the external evaluator for the PIE project. The authors' evaluation efforts have included extensive observation and documentation of PIE project activities; ongoing…

  11. Year 2000 Computerized Farm Project. Final Report.

    ERIC Educational Resources Information Center

    McGrann, James M.; Lippke, Lawrence A.

    An ongoing project was funded to develop and demonstrate a computerized approach to operation and management of a commercial-sized farm. Other project objectives were to facilitate the demonstration of the computerized farm to the public and to develop individual software packages and make them available to the public. Project accomplishments…

  12. How the Contents of a Bachelor's Degree Final Project of Engineering Evolve towards Innovative Scientific Knowledge: Keys to Success

    ERIC Educational Resources Information Center

    Núñez, Cristina; Guinea, Ana; Callau, Sara; Bengoa, Christophe; Basco, Josep; Gavaldà, Jordi

    2017-01-01

    The Bachelor's Degree Final Project (BDFP) of our school aims to develop a real constructive project, enhance cooperative teamwork and increase productivity of students. We present a real case study, related with engineering and scientific innovation results obtained by BDFP, which has led to an innovative scientific study presented at the 7th…

  13. 33 CFR 165.T13-149 - Safety Zone; McNary-John Day Transmission Line Project, Columbia River, Hermiston, OR.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Transmission Line Project, Columbia River, Hermiston, OR. 165.T13-149 Section 165.T13-149 Navigation and... Project, Columbia River, Hermiston, OR. (a) Location: The following is a safety zone: All waters of the Columbia River between two lines with the first line starting at the north bank at 45° 56′ 16.5″ N/119° 19...

  14. Final Project Report - Revised Version

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Prasad, Manika; Carolyn, Koh

    An over-arching goal of this research is to calibrate geophysical techniques for hydrate exploration, evaluation, and production monitoring. Extensive field data of hydrate-bearing sediments exist, but quantitative estimates of the amount and distribution of hydrates are difficult to determine. Thus, the primary project objectives were to relate seismic and acoustic velocities and attenuations to hydrate saturation and texture. The project aimed to collect seismic properties along with other measurements (e.g., complex resistivity, micro-focus x-ray computed tomography, etc.). The multiphysics dataset would enable researchers to understand not only the interaction between mineral surfaces and gas hydrates, but also how the hydratemore » formation method affects the hydrate-sediment system in terms of elastic properties.« less

  15. 75 FR 53701 - Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-N-0394] Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01); Correction AGENCY: Food and Drug Administration, HHS. ACTION: Notice; correction. SUMMARY: The Food and Drug...

  16. 41. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H. VIEW FROM APPROXIMATELY THE SAME SPOT SHOWING HOW COVERING THE ROCK FILLS WITH SOIL HAS ALMOST OBLITERATED THESE SCARS. TO IDENTIFY A POINT FOR COMPARISON NOTICE THE BRIDE GULCH JUST TO THE LEFT OF THE CENTER IN THE UPPER PICTURE AND COMPARE WITH THE SAME GULCH IN THE LOWER PICTURE. THE AFTER PHOTO OF A BEFORE AND AFTER SET. BEFORE PHOTO IS HI-52-40. - Haleakala National Park Roads, Pukalani, Maui County, HI

  17. A system safety model for developmental aircraft programs

    NASA Technical Reports Server (NTRS)

    Amberboy, E. J.; Stokeld, R. L.

    1982-01-01

    Basic tenets of safety as applied to developmental aircraft programs are presented. The integration of safety into the project management aspects of planning, organizing, directing and controlling is illustrated by examples. The basis for project management use of safety and the relationship of these management functions to 'real-world' situations is presented. The rationale which led to the safety-related project decision and the lessons learned as they may apply to future projects are presented.

  18. The Final Year Project (FYP) in Social Sciences: Establishment of Its Associated Competences and Evaluation Standards

    ERIC Educational Resources Information Center

    Mateo, Joan; Escofet, Anna; Martinez, Francesc; Ventura, Javier; Vlachopoulos, Dimitrios

    2012-01-01

    This paper presents the fundamental characteristics of the Final Year Project (FYP), its associated competences and some evaluation standards that derived from a research conducted by the regional government of Catalonia (Spain) and the Catalan University Quality Assurance Agency. More analytically, the paper begins with the definition of the…

  19. Choosing Optional Infused Career Education for Students in High School Bilingual Programs (Project CHOICE). Final Evaluation Report 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Cantalupo, Denise

    Project CHOICE was an Elementary and Secondary Education Act Title VII-funded project in its fifth and final year of operation at Fort Hamilton High School in Brooklyn and Springfield Gardens High School in Queens (both in New York City). In 1992-93 the project served 364 students of limited English proficiency. Participants received instruction…

  20. Two Different Approaches to Teaching Final-Year Projects for Mechanical Engineers and Biotechnologists at Ngee Ann Polytechnic--Case Studies Approach.

    ERIC Educational Resources Information Center

    Walsh, Kath; Rebaczonok-Padulo, Michael

    1993-01-01

    Ngee Ann Polytechnic, a leading postsecondary technical institution in Singapore, offers English for academic and occupational purposes to prepare students for writing their final year projects. This article discusses the approaches used in Mechanical Engineering and Biotechnology projects. A sample exercise is appended. (Contains two references.)…

  1. 77 FR 46764 - Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-06

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-N-0011] Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01) AGENCY: Food... orphan products. Orphan products are drugs, biologics, medical devices, and medical foods that are...

  2. Cooperative Program Improvement; An Experiment in ABE In-Service Training. Doolittle Family Education Center Experimental In-Service Training Project. Final Report.

    ERIC Educational Resources Information Center

    Griffith, William S.; And Others

    This document, consisting of seven chapters and 12 appendixes, is a full final report of the Doolittle Family Education Center Experimental In-Service Training Project. Chapter II consists of the history and plan of the project including an explanation of the framework of the model that was used to conceptualize the project. Chapter III is a…

  3. Patient safety in external beam radiotherapy, results of the ACCIRAD project: Recommendations for radiotherapy institutions and national authorities on assessing risks and analysing adverse error-events and near misses.

    PubMed

    Malicki, Julian; Bly, Ritva; Bulot, Mireille; Godet, Jean-Luc; Jahnen, Andreas; Krengli, Marco; Maingon, Philippe; Prieto Martin, Carlos; Skrobala, Agnieszka; Valero, Marc; Jarvinen, Hannu

    2018-05-02

    The ACCIRAD project, commissioned by the European Commission (EC) to develop guidelines for risk analysis of accidental and unintended exposures in external beam radiotherapy (EBRT), was completed in the year 2014. In 2015, the "General guidelines on risk management in external beam radiotherapy" were published as EC report Radiation Protection (RP)-181. The present document is the third and final report of the findings from the ACCIRAD project. The main aim of this paper is to describe the key features of the risk management process and to provide general guidelines for radiotherapy departments and national authorities on risk assessment and analysis of adverse error-events and near misses. The recommendations provided here and in EC report RP-181 are aimed at promoting the harmonisation of risk management systems across Europe, improving patient safety, and enabling more reliable inter-country comparisons. Copyright © 2018 Elsevier B.V. All rights reserved.

  4. Basic Program Elements for Federal employee Occupational Safety and Health Programs and related matters; Subpart I for Recordkeeping and Reporting Requirements. Final rule.

    PubMed

    2013-08-05

    OSHA is issuing a final rule amending the Basic Program Elements to require Federal agencies to submit their occupational injury and illness recordkeeping information to the Bureau of Labor Statistics (BLS) and OSHA on an annual basis. The information, which is already required to be created and maintained by Federal agencies, will be used by BLS to aggregate injury and illness information throughout the Federal government. OSHA will use the information to identify Federal establishments with high incidence rates for targeted inspection, and assist in determining the most effective safety and health training for Federal employees. The final rule also interprets several existing basic program elements in our regulations to clarify requirements applicable to Federal agencies, amends the date when Federal agencies must submit to the Secretary of Labor their annual report on occupational safety and health programs, amends the date when the Secretary of Labor must submit to the President the annual report on Federal agency safety and health, and clarifies that Federal agencies must include uncompensated volunteers when reporting and recording occupational injuries and illnesses.

  5. Integration of functional safety systems on the Daniel K. Inouye Solar Telescope

    NASA Astrophysics Data System (ADS)

    Williams, Timothy R.; Hubbard, Robert P.; Shimko, Steve

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) was envisioned from an early stage to incorporate a functional safety system to ensure the safety of personnel and equipment within the facility. Early hazard analysis showed the need for a functional safety system. The design used a distributed approach in which each major subsystem contains a PLC-based safety controller. This PLC-based system complies with the latest international standards for functional safety. The use of a programmable controller also allows for flexibility to incorporate changes in the design of subsystems without adversely impacting safety. Various subsystems were built by different contractors and project partners but had to function as a piece of the overall control system. Using distributed controllers allows project contractors and partners to build components as standalone subsystems that then need to be integrated into the overall functional safety system. Recently factory testing was concluded on the major subsystems of the facility. Final integration of these subsystems is currently underway on the site. Building on lessons learned in early factory tests, changes to the interface between subsystems were made to improve the speed and ease of integration of the entire system. Because of the distributed design each subsystem can be brought online as it is delivered and assembled rather than waiting until the entire facility is finished. This enhances safety during the risky period of integration and testing. The DKIST has implemented a functional safety system that has allowed construction of subsystems in geographically diverse locations but that function cohesively once they are integrated into the facility currently under construction.

  6. Drinking-driving attitudes : a comparison of the first two household surveys of the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1974-01-01

    This report provides an analysis of the community response to the public information countermeasure of the Fairfax Alcohol Safety Action Project, one thrust of a national effort to get the drunken driver off the highway. A series of in-depth househol...

  7. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taddeucci, Joe

    2013-03-29

    unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative

  8. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giordano, Anthony P.

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  9. The impact of occupational health and safety regulations on prevention through design in construction projects: Perspectives from Spain and the United Kingdom.

    PubMed

    Martínez-Aires, María Dolores; Rubio Gámez, María Carmen; Gibb, Alistair

    2015-01-01

    Since the mid-1990 s, Prevention through Design (PtD) has become increasingly prevalent in the built environment. The acceptance of PtD has largely been due to the removal or reduction of risks during the execution phase of construction projects. European States have had the added impetus of national legislation. This paper analyzes the influence of European Union Directive 92/57/EEC on occupational safety and health injury prevention in the project design phase. Qualitative methods comprised individual semi-structured interviews and focus groups with a panel of experts. Sixty individuals from construction and related professions (architects, engineers, constructors, developers, and other construction experts) answered 17 key questions to establish national perceptions of the effectiveness of Directive 92/57/EEC in Spain and the United Kingdom (UK). The implementation of PtD in the project design phase in the UK is clearer since the regulations explicitly state the obligations of project designers as well as those of the coordinator. Interviews with Spanish experts show that, in Spain, the prevention culture is less frequently realized. The most significant differences between the European Directive and national regulations which influence PtD are linked to the Health and Safety Coordinator, and Health and Safety documents.

  10. Medicare and Medicaid programs; fire safety requirements for certain health care facilities; amendment. Interim final rule with comment period.

    PubMed

    2005-03-25

    This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.

  11. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed bymore » subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.« less

  12. Anthropometric Training Project. Final Report.

    ERIC Educational Resources Information Center

    San Diego State Coll., CA.

    The Anthropometric Training Project was aimed at providing a training program for select students to develop research competency in an area relating body type, composition, anthropometric assessment, and physical performance measures. The program involves interdisciplinary cooperation in training through seminars, laboratory practice, and…

  13. Project Head Start Research and Evaluation Center, Syracuse University Research Institute. Final Report, November 1, 1967.

    ERIC Educational Resources Information Center

    Hall, Vernon; And Others

    This document describes the research activities of the Syracuse University Evaluation and Research Center for the year September 1, 1966 through August 31, 1967. This final report is organized on the basis of six research projects, which have been abstracted under the following titles and numbers: (1) Experiments in Grammatical Processing in…

  14. Workplace Literacy Project. Final Report.

    ERIC Educational Resources Information Center

    Lopilato, Louis

    The final report on a Mercy College (New York) program of mathematics and vocational English-as-a-Second-Language (ESL) instruction for limited-English-proficient workers in a manufacturing company is presented. The report consists of documentary materials, and is organized according to the five chronological terms in which the program operated,…

  15. Safety performance evaluation of converging chevron pavement markings : final report.

    DOT National Transportation Integrated Search

    2014-12-01

    The objectives of this study were (1) to perform a detailed safety analysis of converging chevron : pavement markings, quantifying the potential safety benefits and developing an understanding of the : incident types addressed by the treatment, and (...

  16. SafeConnect Solar - Final Scientific/Technical Report (Updated)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McNish, Zachary

    2016-02-03

    Final Scientific/Technical Report from Tier 0 SunShot Incubator award for hardware-based solution to reducing soft costs of installed solar. The primary objective of this project was for SafeConnect Solar (“SafeConnect”) to create working proof-of-concept hardware prototypes from its proprietary intellectual property and business concepts for a plug-and-play, safety-oriented hardware solution for photovoltaic solar systems. Specifically, SafeConnect sought to build prototypes of its “SmartBox” and related cabling and connectors, as well as the firmware needed to run the hardware. This hardware is designed to ensure a residential PV system installed with it can address all safety concerns that currently form themore » basis of AHJ electrical permitting and licensing requirements, thereby reducing the amount of permitting and specialized labor required on a residential PV system, and also opening up new sales channels and customer acquisition opportunities.« less

  17. Understanding the relationship between safety investment and safety performance of construction projects through agent-based modeling.

    PubMed

    Lu, Miaojia; Cheung, Clara Man; Li, Heng; Hsu, Shu-Chien

    2016-09-01

    The construction industry in Hong Kong increased its safety investment by 300% in the past two decades; however, its accident rate has plateaued to around 50% for one decade. Against this backdrop, researchers have found inconclusive results on the causal relationship between safety investment and safety performance. Using agent-based modeling, this study takes an unconventional bottom-up approach to study safety performance on a construction site as an outcome of a complex system defined by interactions among a worksite, individual construction workers, and different safety investments. Instead of focusing on finding the absolute relationship between safety investment and safety performance, this study contributes to providing a practical framework to investigate how different safety investments interacting with different parameters such as human and environmental factors could affect safety performance. As a result, we could identify cost-effective safety investments under different construction scenarios for delivering optimal safety performance. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. Access for All: Collaboration for Comprehensive Child Care for Deaf and Hearing Preschoolers and Their Families. Project Access. Final Report.

    ERIC Educational Resources Information Center

    Solit, Gail A.

    This final report presents activities and accomplishments of a three-year outreach project to link programs and agencies serving deaf and hard of hearing children and their families with child care programs in their communities. Each year project staff provided training in establishing integrated early childhood programming and child care for at…

  19. 49 CFR 389.29 - Adoption of final rules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Adoption of final rules. 389.29 Section 389.29 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY...-FEDERAL MOTOR CARRIER SAFETY REGULATIONS Procedures for Adoption of Rules § 389.29 Adoption of final rules...

  20. 49 CFR 389.29 - Adoption of final rules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Adoption of final rules. 389.29 Section 389.29 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY...-FEDERAL MOTOR CARRIER SAFETY REGULATIONS Procedures for Adoption of Rules § 389.29 Adoption of final rules...

  1. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level ifmore » known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV.« less

  2. NASA Aviation Safety Program Systems Analysis/Program Assessment Metrics Review

    NASA Technical Reports Server (NTRS)

    Louis, Garrick E.; Anderson, Katherine; Ahmad, Tisan; Bouabid, Ali; Siriwardana, Maya; Guilbaud, Patrick

    2003-01-01

    The goal of this project is to evaluate the metrics and processes used by NASA's Aviation Safety Program in assessing technologies that contribute to NASA's aviation safety goals. There were three objectives for reaching this goal. First, NASA's main objectives for aviation safety were documented and their consistency was checked against the main objectives of the Aviation Safety Program. Next, the metrics used for technology investment by the Program Assessment function of AvSP were evaluated. Finally, other metrics that could be used by the Program Assessment Team (PAT) were identified and evaluated. This investigation revealed that the objectives are in fact consistent across organizational levels at NASA and with the FAA. Some of the major issues discussed in this study which should be further investigated, are the removal of the Cost and Return-on-Investment metrics, the lack of the metrics to measure the balance of investment and technology, the interdependencies between some of the metric risk driver categories, and the conflict between 'fatal accident rate' and 'accident rate' in the language of the Aviation Safety goal as stated in different sources.

  3. 77 FR 53164 - Railroad Workplace Safety; Adjacent-Track On-Track Safety for Roadway Workers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ...-0059, Notice No. 6] RIN 2130-AC37 Railroad Workplace Safety; Adjacent-Track On-Track Safety for Roadway... complex issues raised in both the petitions for reconsideration of the final rule published November 30... issues. One of the Petitions included a request for a delay in the effective date of the final rule until...

  4. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on highmore » fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.« less

  5. William H. Taft High School, Project Adelante. O.E.E. Evaluation Report, 1982-1983. [Final Report].

    ERIC Educational Resources Information Center

    Keyes, Jose Luis; Schulman, Robert

    Project Adelante, in its third and final year of funding, provided instruction in English as a Second Language (ESL) and Spanish language skills, as well as bilingual instruction in mathematics, science, and social studies, to 230 (fall semester) and 235 (spring semester) limited English proficient Hispanic students at Willaim H. Taft High School,…

  6. Project F. A. S. T.: Facilitating Academic Study Techniques for Handicapped Children. Volume 2. Final Report.

    ERIC Educational Resources Information Center

    Martin, Clessen J.

    Volume 2, the appendix to the final report of Project FAST, consists of prose selections used to study the effects of text reduction techniques on the comprehension and recall of written materials among visually handicapped and hearing impaired subjects. Each selection is presented in various versions such as 10 percent subjective deleted, 20…

  7. The collection of national trend data on alcohol related crashes for comparison with alcohol safety action projects results. Volume 2, ASAP control site data

    DOT National Transportation Integrated Search

    1977-07-01

    As a result of evaluations of the Alcohol Safety Action Projects (ASAP), a requirement was generated by the National Highway Traffic Safety Administration (NHTSA) for the development of a data base of alcohol-related accidents in communities with no ...

  8. Montana Faxnet Project. Final Report.

    ERIC Educational Resources Information Center

    Brander, Linda L.

    This report summarizes the activities and accomplishments of the Montana Faxnet Project, which was created to design and demonstrate a statewide document delivery network utilizing telefacsimile equipment that would create equitable access for all Montanans accessing and retrieving information, and reduce the waiting time for requested materials…

  9. 77 FR 23159 - Locomotive Safety Standards; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    .... FRA-2009-0094 and FR-2009-0095, Notice No. 4] RIN 2130-AC16 Locomotive Safety Standards; Correction... notifying the public that the correct docket number for the Locomotive Safety Standards final rule is FRA... rule related to locomotive safety standards. See 77 FR 21312. The final rule established a public...

  10. Final Report on Improvements to the External Corrosion Direct Assessment (ECDA) Process (WP # 360) Potential Measurements on Paved Areas (Project #243)

    DOT National Transportation Integrated Search

    2010-06-01

    On June 28, 2007, PHMSA released a Broad Agency Announcement (BAA), DTPH56- 07-BAA-000002, seeking white papers on individual projects and consolidated Research and Development (R&D) programs addressing topics on their pipeline safety program. Althou...

  11. Study of Procedures for Determining the Least Restrictive Environment (LRE) Placement of Handicapped Children: Final Project Report.

    ERIC Educational Resources Information Center

    Thouvenelle, Suzanne; And Others

    The final document in a series on least restrictive environment (LRE) placement for handicapped students summarizes the objectives and findings of the project. Research questions, methodology, and conclusions are reviewed from each of four research activities: state education agency analysis; local education agency analysis; legal analysis; and…

  12. Roadway safety design workbook.

    DOT National Transportation Integrated Search

    2009-07-01

    Highway safety is an ongoing concern to the Texas Department of Transportation (TxDOT). As part of its : proactive commitment to improving highway safety, TxDOT is moving toward including quantitative safety : analyses earlier in the project developm...

  13. Highway safety design workshops.

    DOT National Transportation Integrated Search

    2010-11-01

    Highway safety is an ongoing concern for the Texas Department of Transportation (TxDOT). As part of its : proactive commitment to improving highway safety, TxDOT is moving toward including quantitative safety : analyses earlier in the project develop...

  14. Federal motor carrier safety administration safety 2010 strategy and performance planning : project description

    DOT National Transportation Integrated Search

    2000-12-01

    The Motor Carrier Safety Improvement Act (MCSIA) of 1999, Pub. L. 106-159, created the Federal Motor Carrier Safety Administration (FMCSA) in January 2000. Section 104 of the Act requires the Secretary to develop a long-term strategy for improving co...

  15. Evaluation Of The Vehicle Radar Safety Systems Rashid Radar Safety Brake Collision Warning System, Final Report

    DOT National Transportation Integrated Search

    1988-02-01

    THIS EVALUATION OF THE VEHICLE RADAR SAFETY SYSTEMS? ANTI-COLLISION DEVICE (HEREAFTER VRSS) WAS UNDERTAKEN BY THE OPERATOR PERFORMANCE AND SAFETY ANALYSIS DIVISION OF THE TRANSPORTATION SYSTEMS CENTER AT THE REQUEST OF THE NATIONAL HIGHWAY TRAFFIC SA...

  16. Software Safety Risk in Legacy Safety-Critical Computer Systems

    NASA Technical Reports Server (NTRS)

    Hill, Janice L.; Baggs, Rhoda

    2007-01-01

    Safety Standards contain technical and process-oriented safety requirements. Technical requirements are those such as "must work" and "must not work" functions in the system. Process-Oriented requirements are software engineering and safety management process requirements. Address the system perspective and some cover just software in the system > NASA-STD-8719.13B Software Safety Standard is the current standard of interest. NASA programs/projects will have their own set of safety requirements derived from the standard. Safety Cases: a) Documented demonstration that a system complies with the specified safety requirements. b) Evidence is gathered on the integrity of the system and put forward as an argued case. [Gardener (ed.)] c) Problems occur when trying to meet safety standards, and thus make retrospective safety cases, in legacy safety-critical computer systems.

  17. Safety of novel projects, the battle against Murphy's law.

    PubMed

    Schmidt, R

    2001-01-01

    With great pleasure and respect I have accepted the offer to speak in this congress. Medicine was a dream for me sometime ago and my second choice for studies. I remained with my first choice engineering and I am still happy with it; but I never forgot my love and enthusiasm for medicine. My career brought me in contact with many countries and technologies, but the development towards safety management became a dominant trend. At CERN I am a Group Leader in Matters of Safety for the Compact Muon Solenoid (CMS) experiment. In the last few years my attention has been increasingly focused on human and institutional safety aspects, besides the technical ones. My paper deals with three major topics: Safety management at CERN-CMS Murphy's law and the growing importance of institutional and human factors in safety Future outlook for safety and conclusions. In the conclusions the commonalities between different technologies become more evident as the importance of the human nature and man's role and enticement to actively and intelligently contribute to safety are presented. Based on experience and references an appeal is launched to pay more attention to the human factor in safety and recognize the rules and regularities of human behaviour in order to better combat Murphy's law.

  18. Safety impacts of the I-35W improvements done under Minnesota's urban partnership agreement (UPA) project : final report.

    DOT National Transportation Integrated Search

    2017-06-01

    As part of an Urban Partnership Agreement project, the Minnesota Department of Transportation added lanes : and began operating a priced dynamic shoulder lane (PDSL) on parts of Interstate 35W. Following the opening of : these improvements, the frequ...

  19. Technology and Tool Development to Support Safety and Mission Assurance

    NASA Technical Reports Server (NTRS)

    Denney, Ewen; Pai, Ganesh

    2017-01-01

    The Assurance Case approach is being adopted in a number of safety-mission-critical application domains in the U.S., e.g., medical devices, defense aviation, automotive systems, and, lately, civil aviation. This paradigm refocuses traditional, process-based approaches to assurance on demonstrating explicitly stated assurance goals, emphasizing the use of structured rationale, and concrete product-based evidence as the means for providing justified confidence that systems and software are fit for purpose in safely achieving mission objectives. NASA has also been embracing assurance cases through the concepts of Risk Informed Safety Cases (RISCs), as documented in the NASA System Safety Handbook, and Objective Hierarchies (OHs) as put forth by the Agency's Office of Safety and Mission Assurance (OSMA). This talk will give an overview of the work being performed by the SGT team located at NASA Ames Research Center, in developing technologies and tools to engineer and apply assurance cases in customer projects pertaining to aviation safety. We elaborate how our Assurance Case Automation Toolset (AdvoCATE) has not only extended the state-of-the-art in assurance case research, but also demonstrated its practical utility. We have successfully developed safety assurance cases for a number of Unmanned Aircraft Systems (UAS) operations, which underwent, and passed, scrutiny both by the aviation regulator, i.e., the FAA, as well as the applicable NASA boards for airworthiness and flight safety, flight readiness, and mission readiness. We discuss our efforts in expanding AdvoCATE capabilities to support RISCs and OHs under a project recently funded by OSMA under its Software Assurance Research Program. Finally, we speculate on the applicability of our innovations beyond aviation safety to such endeavors as robotic, and human spaceflight.

  20. New Jersey Technical Assistance Project (N.J. TAP): "Educational Resources and Support Services on Behalf of Children with Multiple Sensory Impairment." Final Report.

    ERIC Educational Resources Information Center

    New Jersey State Dept. of Education, Trenton.

    This final report describes activities and accomplishments of the New Jersey Technical Assistance Project, a project to improve educational resources and support services for students with multiple sensory impairment (deaf-blindness). Activities and accomplishments are presented in a tabular format for each project goal and objective. The project…

  1. IEC 61511 and the capital project process--a protective management system approach.

    PubMed

    Summers, Angela E

    2006-03-17

    This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.

  2. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Post, Thomas C.; Strom, Dean; Beulow, Laura

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 andmore » 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)« less

  3. Space-Based Telemetry and Range Safety Project Ku-Band and Ka-Band Phased Array Antenna

    NASA Technical Reports Server (NTRS)

    Whiteman, Donald E.; Valencia, Lisa M.; Birr, Richard B.

    2005-01-01

    The National Aeronautics and Space Administration Space-Based Telemetry and Range Safety study is a multiphase project to increase data rates and flexibility and decrease costs by using space-based communications assets for telemetry during launches and landings. Phase 1 used standard S-band antennas with the Tracking and Data Relay Satellite System to obtain a baseline performance. The selection process and available resources for Phase 2 resulted in a Ku-band phased array antenna system. Several development efforts are under way for a Ka-band phased array antenna system for Phase 3. Each phase includes test flights to demonstrate performance and capabilities. Successful completion of this project will result in a set of communications requirements for the next generation of launch vehicles.

  4. Project Aprendizaje. Final Evaluation Report 1992-93.

    ERIC Educational Resources Information Center

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  5. Compendium of Traffic Safety Research Projects 1985-2013.

    DOT National Transportation Integrated Search

    2014-01-01

    Through many name changes, from the Office of Program Development and Evaluation, the Office of Research and Evaluation, to the current, Office of Behavioral Safety Research, our focus has remained on improving the safety of drivers, occupants, pedes...

  6. Well Elderly Integrated Training Project. Final Report.

    ERIC Educational Resources Information Center

    Summit-Portage Area Health Education Network, Akron, OH.

    The Well Elderly Integrated Training Project was conceptualized as a service-oriented endeavor with an evaluation component. The project required that a university medical school resource faculty develop an integrated training program and materials on health education (wellness) for trainers who were respected, healthy elderly high in the senior…

  7. First NASA Aviation Safety Program Weather Accident Prevention Project Annual Review

    NASA Technical Reports Server (NTRS)

    Colantonio, Ron

    2000-01-01

    The goal of this Annual Review was to present NASA plans and accomplishments that will impact the national aviation safety goal. NASA's WxAP Project focuses on developing the following products: (1) Aviation Weather Information (AWIN) technologies (displays, sensors, pilot decision tools, communication links, etc.); (2) Electronic Pilot Reporting (E-PIREPS) technologies; (3) Enhanced weather products with associated hazard metrics; (4) Forward looking turbulence sensor technologies (radar, lidar, etc.); (5) Turbulence mitigation control system designs; Attendees included personnel from various NASA Centers, FAA, National Weather Service, DoD, airlines, aircraft and pilot associations, industry, aircraft manufacturers and academia. Attendees participated in discussion sessions aimed at collecting aviation user community feedback on NASA plans and R&D activities. This CD is a compilation of most of the presentations presented at this Review.

  8. Computer Conferencing Project. Final Report.

    ERIC Educational Resources Information Center

    McNeil, Donald R.; And Others

    This report of a 3-year project discusses the results of the testing of computer conferencing and e-mail (electronic mail) at Montgomery College (Maryland) over a period of four semesters. The product was designed to answer the following questions: (1) Could computer conferencing or e-mail increase access? (2) Would the quality of the instruction…

  9. Conflict Management in Schools: Sowing Seeds for a Safer Society. Final Report of the School Conflict Management Demonstration Project 1990-1993.

    ERIC Educational Resources Information Center

    Wheeler, Terrence; And Others

    In August 1990, the Ohio Commission on Dispute Resolution and Conflict Management initiated a three-year School Conflict Management Demonstration Project. This publication is the final report on the Project. Twenty schools, which reflected the state's diversity, were selected to help assess the impact of the conflict management programs. The…

  10. Community College Technical Mathematics Project. Final Report.

    ERIC Educational Resources Information Center

    Self, Samuel L.

    The purpose of the research project was to develop an applied or technical mathematics curriculum which would meet the needs of vocational-technical students at the community college level. The research project was divided into three distinct phases: Identifying the mathematical concepts requisite for job-entry competencies in each of the…

  11. New and Emerging Occupations Project. Final Report.

    ERIC Educational Resources Information Center

    Southeast Community Coll., Lincoln, NE.

    This document reports a project to define, identify, and describe new and emerging occupations in Nebraska and disseminate that information to vocational education program and curriculum planners. Chapter 1 describes the background, problem, and purpose of the project. Chapter 2 sets forth the objectives and discusses procedures for developing a…

  12. Safety effectiveness of pedestrian crossing enhancements : final report.

    DOT National Transportation Integrated Search

    2017-02-01

    Over the last decade, the Oregon DOT and other agencies have systematically implemented many pedestrian crossing enhancements (PCEs) across the state. This study explored the safety performance of these enhanced crossing in Oregon. Detailed data were...

  13. Safety-related requirements for photovoltaic modules and arrays. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levins, A.

    1984-03-01

    Underwriters Laboratories has conducted a study to identify and develop safety requirements for photovoltaic module and panel designs and configurations for residential, intermediate, and large scale applications. Concepts for safety systems, where each system is a collection of subsystems which together address the total anticipated hazard situation, are described. Descriptions of hardware, and system usefulness and viability are included. This discussion of safety systems recognizes that there is little history on which to base the expected safety related performance of a photovoltaic system. A comparison of these systems, as against the provisions of the 1984 National Electrical Code covering photovoltaicmore » systems is made. A discussion of the UL investigation of the photovoltaic module evaluated to the provisions of the Proposed UL Standard for Flat-Plate Photovoltaic Modules and Panels is included. Grounding systems, their basis and nature, and the advantages and disadvantages of each are described. The meaning of frame grounding, circuit grounding, and the type of circuit ground are covered. The development of the Standard for Flat-Plate Photovoltaic Modules and Panels has continued, and with both industry comment and a product submittal and listing, the Standard has been refined to a viable document allowing an objective safety review of photovoltaic modules and panels. How this document, and other UL documents would cover investigations of certain other photovoltaic system components is described.« less

  14. Training Course for Compliance Safety and Health Officers. Final Report.

    ERIC Educational Resources Information Center

    McKnight, A. James; And Others

    The report describes revision of the Compliance Safety and Health Officers (CSHO) course for the Department of Labor, Occupational Safety and Health Administration (OSHA). The CSHO's job was analyzed in depth, in accord with OSHA standards, policies, and procedures. A listing of over 1,700 violations of OSHA standards was prepared, and specialists…

  15. An observational survey of safety belt and child safety seat use in Virginia : final report : the 1990 update.

    DOT National Transportation Integrated Search

    1992-01-01

    This report was prepared in response to a request from the Transportation Safety Administration of the Virginia Department ofMotor Vehicles for data concerning the use of safety belts and child safety seats by the occupants of vehicles bearing Virgin...

  16. The Oregon Applied Academics Project: Final Report

    ERIC Educational Resources Information Center

    Pearson, Donna; Richardson, George B.; Sawyer, Jennifer M.

    2013-01-01

    This report contains the findings of the Oregon Applied Academics research and development project which spanned three academic years from 2010 through 2013. The overall purpose of the project was to develop and implement a technical math course that would meet graduation requirements and improve student performance. The State of Oregon has been…

  17. Project D. E. A. F. Final Report.

    ERIC Educational Resources Information Center

    Hairston, Ernest E.

    Project D.E.A.F., its introduction and background, purpose, clientele, methodology, and activities, are described. Project D.E.A.F. was established by an expansion grant from the Rehabilitation Service Administration of the Department of Health, Education and Welfare, in cooperation with the Ohio Bureau of Vocational Rehabilitation for the purpose…

  18. Motivation for Reading Improvement. Final Project Report.

    ERIC Educational Resources Information Center

    Kit Carson Union Elementary School District, Hanford, CA.

    This document reports on a project aimed at motivating students to develop attitudes that learning can be fun and that it can benefit them, and at discouraging students from working just to please the teacher. The project involved the use of a "News Laboratory," which included a United Press International wire service, various…

  19. Draft project management update to the Iowa DOT Project Development Manual : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  20. Final Environmental Assessment for Stormwater Drainage Project on F. E. Warren Air Force Base, Wyoming

    DTIC Science & Technology

    2005-05-01

    Colorado Butterfly Habitat on F. E. Warren AFB Stormwater Drainage Project, Final Environmental Assessment April 2005 F. E. Warren AFB iii Figure...A.11 Colorado Butterfly Plant Populations Near Outfall 1 Figure A.12 Preble’s Habitat on F. E. Warren AFB Figure A.13 Preble’s Captures on F. E...to threatened species habitat in the vicinity of the outfalls to Crow Creek, the base will do the following: Colorado butterfly plant: 1

  1. Georgia Vocational Student Assessment Project. Final Report.

    ERIC Educational Resources Information Center

    Vocational Technical Education Consortium of States, Atlanta, GA.

    A project was conducted to develop vocational education tests for use in Georgia secondary schools, specifically for welding, machine shop, and sheet metal courses. The project team developed an outline of an assessment model that included the following components: (1) select a program for use in developing test items; (2) verify duties, tasks,…

  2. 29 CFR 1955.44 - Final decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Final decision. 1955.44 Section 1955.44 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED..., the Secretary shall issue a final decision ruling upon each exception and objection filed. The final...

  3. Mercer County Community College Workplace Skills Project. Grant Period March 1, 1991-August 31, 1992. Final Evaluation.

    ERIC Educational Resources Information Center

    Mercer County Community Coll., Trenton, NJ.

    This final report of an 18-month workplace literacy project (a partnership of Mercer County Community College, a large automobile components parts manufacturer, a hospital, a physics laboratory, and a chemical plant) contains the following: (1) and introduction; (2) a performance report on nine goals of the program; (3) a schedule of…

  4. 77 FR 64543 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNVB01000 L51100000.GN0000.LVEMF12CF010 241A; NVN-082096; NVN-084632; NVN-091272; 12-08807; MO 4500039779; TAS: 14X5017] Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NV Correction...

  5. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Final ACT configuration evaluation

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Final ACT Configuration Evaluation Task of the Integrated Application of Active Controls (IAAC) technology project within the energy efficient transport program is summarized. The Final ACT Configuration, through application of Active Controls Technology (ACT) in combination with increased wing span, exhibits significant performance improvements over the conventional baseline configuration. At the design range for these configurations, 3590 km, the block fuel used is 10% less for the Final ACT Configuration, with significant reductions in fuel usage at all operational ranges. Results of this improved fuel usage and additional system and airframe costs and the complexity required to achieve it were analyzed to determine its economic effects. For a 926 km mission, the incremental return on investment is nearly 25% at 1980 fuel prices. For longer range missions or increased fuel prices, the return is greater. The technical risks encountered in the Final ACT Configuration design and the research and development effort required to reduce these risks to levels acceptable for commercial airplane design are identified.

  6. Lower Merrimack Valley Workplace Education Project. Final Report.

    ERIC Educational Resources Information Center

    Norris, Cynthia Zylkuski; Breen, Patricia K.

    A description is provided of the Lower Merrimack Valley Workplace Education Project (WEP), an educational project that offers English-as-a-Second-Language (ESL) and job-specific education classes to hourly employees in the Semiconductor Division of Alpha Industries. The challenge of the project was to create a WEP that could accommodate the…

  7. 78 FR 27419 - Final Safety Culture Policy Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    .... The BSEE appreciates this suggestion and is currently working to develop information sessions and... industries (e.g., Federal Aviation Administration, Nuclear Regulatory Commission, Petroleum Safety Authority... environmental stewardship to a vigorous and respected offshore energy industry. Each and every person involved...

  8. From the traditional concept of safety management to safety integrated with quality.

    PubMed

    García Herrero, Susana; Mariscal Saldaña, Miguel Angel; Manzanedo del Campo, Miguel Angel; Ritzel, Dale O

    2002-01-01

    This editorial reviews the evolution of the concepts of safety and quality that have been used in the traditional workplace. The traditional programs of safety are explored showing strengths and weaknesses. The concept of quality management is also viewed. Safety management and quality management principles, stages, and measurement are highlighted. The concepts of quality and safety guarantee are assessed. Total Quality Management concepts are reviewed and applied to safety quality. Total safety management principles are discussed. Finally, an analysis of the relationship between quality and safety from data collected from a company in Spain is presented.

  9. Federal Motor Carrier Safety Administration’s Advanced System Testing Utilizing a Data Acquisition System on the Highways (FAST DASH) Safety Technology Evaluation Project #2: Driver Monitoring Final Report.

    DOT National Transportation Integrated Search

    2016-12-01

    An independent evaluation of a non-video-based onboard monitoring system (OBMS) was conducted. The objective was to determine if the OBMS system performed reliably, improved driving safety and performance, and improved fuel efficiency in a commercial...

  10. Federal Motor Carrier Safety Administration’s advanced system testing utilizing a data acquisition system on the highways (FAST DASH) safety technology evaluation project #2 : driver monitoring, final report.

    DOT National Transportation Integrated Search

    2016-11-01

    An independent evaluation of a non-video-based onboard monitoring system (OBMS) was conducted. The objective was to determine if the OBMS system performed reliably, improved driving safety and performance, and improved fuel efficiency in a commercial...

  11. DOE-EPSCOR SPONSORED PROJECT FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhu, Jianting

    Concern over the quality of environmental management and restoration has motivated the model development for predicting water and solute transport in the vadose zone. Soil hydraulic properties are required inputs to subsurface models of water flow and contaminant transport in the vadose zone. Computer models are now routinely used in research and management to predict the movement of water and solutes into and through the vadose zone of soils. Such models can be used successfully only if reliable estimates of the soil hydraulic parameters are available. The hydraulic parameters considered in this project consist of the saturated hydraulic conductivity andmore » four parameters of the water retention curves. To quantify hydraulic parameters for heterogeneous soils is both difficult and time consuming. The overall objective of this project was to better quantify soil hydraulic parameters which are critical in predicting water flows and contaminant transport in the vadose zone through a comprehensive and quantitative study to predict heterogeneous soil hydraulic properties and the associated uncertainties. Systematic and quantitative consideration of the parametric heterogeneity and uncertainty can properly address and further reduce predictive uncertainty for contamination characterization and environmental restoration at DOE-managed sites. We conducted a comprehensive study to assess soil hydraulic parameter heterogeneity and uncertainty. We have addressed a number of important issues related to the soil hydraulic property characterizations. The main focus centered on new methods to characterize anisotropy of unsaturated hydraulic property typical of layered soil formations, uncertainty updating method, and artificial neural network base pedo-transfer functions to predict hydraulic parameters from easily available data. The work also involved upscaling of hydraulic properties applicable to large scale flow and contaminant transport modeling in the vadose zone and

  12. 25 CFR 170.144 - What are eligible highway safety projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-related deaths, injuries and accidents; (j) Impaired driver initiatives; (k) Child safety seat programs... travel on IRRs, such as guardrail construction and traffic markings; (f) Development of a safety management system; (g) Education and outreach highway safety programs, such as use of child safety seats...

  13. Surrogate Safety Assessment Model and Validation : Final Report

    DOT National Transportation Integrated Search

    2008-06-01

    Safety of traffic facilities is most often measured by counting the number (and severity) of crashes that occur. It is not possible to apply such a measurement technique to traffic facility designs that have not yet been built or deployed in the real...

  14. Southeast geysers effluent pipeline project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dellinger, M.

    1998-01-15

    The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept wasmore » feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.« less

  15. 49 CFR 385.19 - Safety fitness information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Safety fitness information. 385.19 Section 385.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS SAFETY FITNESS PROCEDURES General § 385.19 Safety fitness information. (a) Final safety ratings, remedial directives, and safety...

  16. 49 CFR 385.19 - Safety fitness information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Safety fitness information. 385.19 Section 385.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS SAFETY FITNESS PROCEDURES General § 385.19 Safety fitness information. (a) Final safety ratings, remedial directives, and safety...

  17. Connected commercial vehicles — retrofit safety device kit project : safety applications and development plan.

    DOT National Transportation Integrated Search

    2014-03-01

    Connected vehicle wireless data communications can enable safety applications that may reduce injuries and fatalities. Cooperative vehicle-to-vehicle (V2V) safety applications will be effective only if a high fraction of vehicles are equipped. Deploy...

  18. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glasser, Alan H.

    Final technical report on DE-SC0016106. This is the final technical report for a portion of the multi-institutional CEMM project. This report is centered around 3 publications and a seminar presentation, which have been submitted to E-Link.

  19. Researchers' Roles in Patient Safety Improvement.

    PubMed

    Pietikäinen, Elina; Reiman, Teemu; Heikkilä, Jouko; Macchi, Luigi

    2016-03-01

    In this article, we explore how researchers can contribute to patient safety improvement. We aim to expand the instrumental role researchers have often occupied in relation to patient safety improvement. We reflect on our own improvement model and experiences as patient safety researchers in an ongoing Finnish multi-actor innovation project through self-reflective narration. Our own patient safety improvement model can be described as systemic. Based on the purpose of the innovation project, our improvement model, and the improvement models of the other actors in the project, we have carried out a wide range of activities. Our activities can be summarized in 8 overlapping patient safety improvement roles: modeler, influencer, supplier, producer, ideator, reflector, facilitator, and negotiator. When working side by side with "practice," researchers are offered and engage in several different activities. The way researchers contribute to patient safety improvement and balance between different roles depends on the purpose of the study, as well as on the underlying patient safety improvement models. Different patient safety research paradigms seem to emphasize different improvement roles, and thus, they also face different challenges. Open reflection on the underlying improvement models and roles can help researchers with different backgrounds-as well as other actors involved in patient safety improvement-in structuring their work and collaborating productively.

  20. A web-based tool for the Comprehensive Unit-based Safety Program (CUSP).

    PubMed

    Pronovost, Peter J; King, Jay; Holzmueller, Christine G; Sawyer, Melinda; Bivens, Shauna; Michael, Michelle; Haig, Kathy; Paine, Lori; Moore, Dana; Miller, Marlene

    2006-03-01

    An organization's ability to change is driven by its culture, which in turn has a significant impact on safety. The six-step Comprehensive Unit-Based Safety Program (CUSP) is intended to improve local culture and safety. A Web-based project management tool for CUSP was developed and then pilot tested at two hospitals. HOW ECUSP WORKS: Once a patient safety concern is identified (step 3), a unit-level interdisciplinary safety committee determines issue criticality and starts up the projects (step 4), which are managed using project management tools within eCUSP (step 5). On a project's completion, the results are disseminated through a shared story (step 6). OSF St. Joseph's Medical Center-The Medical Birthing Center (Bloomington, Illinois), identified 11 safety issues, implemented 11 projects, and created 9 shared stories--including one for its Armband Project. The Johns Hopkins Hospital (Baltimore) Medical Progressive Care (MPC4) Unit identified 5 safety issues and implemented 4 ongoing projects, including the intravenous (IV) Tubing Compliance Project. The eCUSP tool's success depends on an organizational commitment to creating a culture of safety.

  1. Independent evaluation of the transit retrofit package safety applications : final report.

    DOT National Transportation Integrated Search

    2015-02-01

    This report presents the methodology and results of the independent evaluation of retrofit safety packages installed on transit vehicles in the : Safety Pilot Model Deploymentpart of the United States Department of Transportations Intelligent T...

  2. Management of radioactive material safety programs at medical facilities. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Camper, L.W.; Schlueter, J.; Woods, S.

    A Task Force, comprising eight US Nuclear Regulatory Commission and two Agreement State program staff members, developed the guidance contained in this report. This report describes a systematic approach for effectively managing radiation safety programs at medical facilities. This is accomplished by defining and emphasizing the roles of an institution`s executive management, radiation safety committee, and radiation safety officer. Various aspects of program management are discussed and guidance is offered on selecting the radiation safety officer, determining adequate resources for the program, using such contractual services as consultants and service companies, conducting audits, and establishing the roles of authorized usersmore » and supervised individuals; NRC`s reporting and notification requirements are discussed, and a general description is given of how NRC`s licensing, inspection and enforcement programs work.« less

  3. Evaluation of Aeroelastically Tailored Small Wind Turbine Blades Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffin, Dayton A.

    2005-09-29

    Evaluation of Aeroelastically Tailored Small Wind Turbine Blades Final Report Global Energy Concepts, LLC (GEC) has performed a conceptual design study concerning aeroelastic tailoring of small wind turbine blades. The primary objectives were to evaluate ways that blade/rotor geometry could be used to enable cost-of-energy reductions by enhancing energy capture while constraining or mitigating blade costs, system loads, and related component costs. This work builds on insights developed in ongoing adaptive-blade programs but with a focus on application to small turbine systems with isotropic blade material properties and with combined blade sweep and pre-bending/pre-curving to achieve the desired twist coupling.more » Specific goals of this project are to: (A) Evaluate and quantify the extent to which rotor geometry can be used to realize load-mitigating small wind turbine rotors. Primary aspects of the load mitigation are: (1) Improved overspeed safety affected by blades twisting toward stall in response to speed increases. (2) Reduced fatigue loading affected by blade twisting toward feather in response to turbulent gusts. (B) Illustrate trade-offs and design sensitivities for this concept. (C) Provide the technical basis for small wind turbine manufacturers to evaluate this concept and commercialize if the technology appears favorable. The SolidWorks code was used to rapidly develop solid models of blade with varying shapes and material properties. Finite element analyses (FEA) were performed using the COSMOS code modeling with tip-loads and centripetal accelerations. This tool set was used to investigate the potential for aeroelastic tailoring with combined planform sweep and pre-curve. An extensive matrix of design variables was investigated, including aerodynamic design, magnitude and shape of planform sweep, magnitude and shape of blade pre-curve, material stiffness, and rotor diameter. The FEA simulations resulted in substantial insights into the

  4. Experience-Based Career Education. High School Level Demonstration Project. Final Report (October 1, 1976 to July 30, 1979).

    ERIC Educational Resources Information Center

    Greenville County School District, Greenville, SC.

    An Experience-Based Career Education (EBCE) exemplary project was conducted for three years in four high schools in Greenville County, South Carolina, and then evaluated for this final program report. Guidance and community components made up the program's major strengths. A third component (academic) proved nonessential. The guidance component…

  5. 42 CFR 137.333 - What procedures must the Secretary follow if the Secretary rejects a final construction project...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What procedures must the Secretary follow if the... What procedures must the Secretary follow if the Secretary rejects a final construction project... controlling legal authority supporting the rejection; (b) Within 20 days, provide all documents relied on in...

  6. W.A. Parish Post Combustion CO 2 Capture and Sequestration Project Final Public Design Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Armpriester, Anthony

    The Petra Nova Project is a commercial scale post-combustion carbon dioxide capture project that is being developed by a joint venture between NRG Energy (NRG) and JX Nippon Oil and Gas Exploration (JX). The project is designed to separate and capture carbon dioxide from an existing coal-fired unit's flue gas slipstream at NRG's W.A. Parish Generation Station located southwest of Houston, Texas. The captured carbon dioxide will be transported by pipeline and injected into the West Ranch oil field to boost oil production. The project, which is partially funded by financial assistance from the U.S. Department of Energy will usemore » Mitsubishi Heavy Industries of America, Inc.'s Kansai Mitsubishi Carbon Dioxide Recovery (KM-CDR(R)) advanced amine-based carbon dioxide absorption technology to treat and capture at least 90% of the carbon dioxide from a 240 megawatt equivalent flue gas slipstream off of Unit 8 at W.A. Parish. The project will capture approximately 5,000 tons of carbon dioxide per day or 1.5 million tons per year that Unit 8 would otherwise emit, representing the largest commercial scale deployment of post-combustion carbon dioxide capture at a coal power plant to date. The joint venture issued full notice to proceed in July 2014 and when complete, the project is expected to be the world's largest post-combustion carbon dioxide capture facility on an existing coal plant. The detailed engineering is sufficiently complete to prepare and issue the Final Public Design Report.« less

  7. 76 FR 65746 - Notice of Availability of Joint Final Environmental Impact Statement/Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... Boulevard. The project will consist of up to 128 wind turbines (1.5 to 3.0 MW each) with a generating... Statement/Final Environmental Impact Report for the Tule Wind Project, California, and Notice of Intent To... Final Environmental Impact Report (EIR) as a joint environmental analysis document for Tule Wind, LLC's...

  8. Assisting Newcomers through Employment and Support Services: An Evaluation of the New Americans Centers Demonstration Project in Arkansas and Iowa. Final Report

    ERIC Educational Resources Information Center

    Koralek, Robin; Johnson, Heidi; Ratcliffe, Caroline; Vericker, Tracy

    2010-01-01

    This report presents the final results for the evaluation of the New Americans Centers (NACs) demonstration project in Arkansas and Iowa. It focuses on program operations and plans for program sustainability, while highlighting services provided through the demonstration projects in Arkansas and Iowa. It also documents outcomes for New Iowan…

  9. HSE's safety assessment principles for criticality safety.

    PubMed

    Simister, D N; Finnerty, M D; Warburton, S J; Thomas, E A; Macphail, M R

    2008-06-01

    The Health and Safety Executive (HSE) published its revised Safety Assessment Principles for Nuclear Facilities (SAPs) in December 2006. The SAPs are primarily intended for use by HSE's inspectors when judging the adequacy of safety cases for nuclear facilities. The revised SAPs relate to all aspects of safety in nuclear facilities including the technical discipline of criticality safety. The purpose of this paper is to set out for the benefit of a wider audience some of the thinking behind the final published words and to provide an insight into the development of UK regulatory guidance. The paper notes that it is HSE's intention that the Safety Assessment Principles should be viewed as a reflection of good practice in the context of interpreting primary legislation such as the requirements under site licence conditions for arrangements for producing an adequate safety case and for producing a suitable and sufficient risk assessment under the Ionising Radiations Regulations 1999 (SI1999/3232 www.opsi.gov.uk/si/si1999/uksi_19993232_en.pdf).

  10. DE-EE0006714 Final Report-Project Icebreaker™

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Lorry; Karpinski, David; Nagusky, Beth

    Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less

  11. Evaluation of interactive highway safety design model crash prediction tools for two-lane rural roads on Kansas Department of Transportation projects.

    DOT National Transportation Integrated Search

    2014-01-01

    Historically, project-level decisions for the selection of highway features to promote safety were : based on either engineering judgment or adherence to accepted national guidance. These tools have allowed : highway designers to produce facilities t...

  12. Ku- and Ka-Band Phased Array Antenna for the Space-Based Telemetry and Range Safety Project

    NASA Technical Reports Server (NTRS)

    Whiteman, Donald E.; Valencia, Lisa M.; Birr, Richard B.

    2005-01-01

    The National Aeronautics and Space Administration Space-Based Telemetry and Range Safety study is a multiphase project to increase data rates and flexibility and decrease costs by using space-based communications assets for telemetry during launches and landings. Phase 1 used standard S-band antennas with the Tracking and Data Relay Satellite System to obtain a baseline performance. The selection process and available resources for Phase 2 resulted in a Ku-band phased array antenna system. Several development efforts are under way for a Ka-band phased array antenna system for Phase 3. Each phase includes test flights to demonstrate performance and capabilities. Successful completion of this project will result in a set of communications requirements for the next generation of launch vehicles.

  13. MITSI project : final local evaluation report

    DOT National Transportation Integrated Search

    2003-01-01

    The mission statement for the MITSI project was facilitating National Standards Compliance migration for NaviGAtor, conducting National Architecture mapping for MARTA and E911, and evaluating CORBA as a methodology for exchanging data. This involved ...

  14. Developing and Evaluating Interventions Aimed at Increasing Retention of Special Education Teachers (Teacher Support & Retention Project). Final Report.

    ERIC Educational Resources Information Center

    Cooley, Elizabeth

    This final report describes the activities and outcomes of a 3-year federally funded project that developed and evaluated interventions aimed at increasing retention of special education teachers. The interventions developed and evaluated consisted of: (1) a series of stress management workshops aimed at preventing or alleviating teacher burnout,…

  15. X-43A Final Flight Observations

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie

    2011-01-01

    The presentation will provide an overview of the final flight of the NASA X-43A project. The project consisted of three flights, two planned for Mach 7 and one for Mach 10. The first flight, conducted on June 2, 2001, was unsuccessful and resulted in a nine-month mishap investigation. A two-year return to flight effort ensued and concluded when the second Mach 7 flight was successfully conducted on March 27, 2004. The third and final flight, which occurred on November 16, 2004, was the first Mach 10 flight demonstration of an airframe-integrated, scramjet-powered, hypersonic vehicle. As such, the final flight presented first time technical challenges in addition to final flight project closeout concerns. The goals and objectives for the third flight as well as those for the project will be presented. The configuration of the Hyper-X stack including the X-43A, Hyper-X launch vehicle, and Hyper-X research vehicle adapter wil also be presented. Mission differences, vehicle modifications and lessons learned from the first and second flights as they applied to the third flight will also be discussed. Although X-43A flight 3 was always planned to be the final flight of the X-43A project, the X-43 program had two other vehicles and corresponding flight phases in X-43C and X-43B. Those other projects never manifested under the X-43 banner and X-43A flight 3 also became the final flight of X-43 program.

  16. Space Station crew safety alternatives study. Volume 5: Space Station safety plan

    NASA Technical Reports Server (NTRS)

    Mead, G. H.; Peercy, R. L., Jr.; Raasch, R. F.

    1985-01-01

    The Space Station Safety Plan has been prepared as an adjunct to the subject contract final report, suggesting the tasks and implementation procedures to ensure that threats are addressed and resolution strategy options identified and incorporated into the space station program. The safety program's approach is to realize minimum risk exposure without levying undue design and operational constraints. Safety objectives and risk acceptances are discussed.

  17. Enhanced digital mapping project : final report

    DOT National Transportation Integrated Search

    2004-11-19

    The Enhanced Digital Map Project (EDMap) was a three-year effort launched in April 2001 to develop a range of digital map database enhancements that enable or improve the performance of driver assistance systems currently under development or conside...

  18. Accident analysis and control options in support of the sludge water system safety analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HEY, B.E.

    A hazards analysis was initiated for the SWS in July 2001 (SNF-8626, K Basin Sludge and Water System Preliminary Hazard Analysis) and updated in December 2001 (SNF-10020 Rev. 0, Hazard Evaluation for KE Sludge and Water System - Project A16) based on conceptual design information for the Sludge Retrieval System (SRS) and 60% design information for the cask and container. SNF-10020 was again revised in September 2002 to incorporate new hazards identified from final design information and from a What-if/Checklist evaluation of operational steps. The process hazards, controls, and qualitative consequence and frequency estimates taken from these efforts have beenmore » incorporated into Revision 5 of HNF-3960, K Basins Hazards Analysis. The hazards identification process documented in the above referenced reports utilized standard industrial safety techniques (AIChE 1992, Guidelines for Hazard Evaluation Procedures) to systematically guide several interdisciplinary teams through the system using a pre-established set of process parameters (e.g., flow, temperature, pressure) and guide words (e.g., high, low, more, less). The teams generally included representation from the U.S. Department of Energy (DOE), K Basins Nuclear Safety, T Plant Nuclear Safety, K Basin Industrial Safety, fire protection, project engineering, operations, and facility engineering.« less

  19. Project Familia. Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Project Familia was an Elementary and Secondary Education Act Title VII project in its second year in 1993-94 in New York City. Project Familia served 77 children at 3 schools who were identified as limited English proficient, special education students in prekindergarten through fifth grade and their parents. The project provided after-school…

  20. Final Report for NMBSA Project, Monika Kaden, 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ward, William Carl

    The following pages define the objectives and results for Project 022, requested by Monika Kaden, a sculptor who maintains studios in Santa Fe. This effort was first approved in February 2016, and was completed during several different time segments spread over the year, depending on Monika’s availability. The project deliverables that are of primary use to the customer are digital data files that are to be delivered electronically. This report is a summary overview of how the project was conducted.

  1. Improved processes for meeting the data requirements for implementing the Highway Safety Manual (HSM) and Safety Analyst in Florida.

    DOT National Transportation Integrated Search

    2014-03-01

    Recent research in highway safety has focused on the more advanced and statistically proven techniques of highway : safety analysis. This project focuses on the two most recent safety analysis tools, the Highway Safety Manual (HSM) : and SafetyAnalys...

  2. WindFloat Pacific Project, Final Scientific and Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Banister, Kevin

    2017-01-17

    PPI’s WindFloat Pacific project (WFP) was an up to 30 MW floating offshore wind demonstration project proposed off the Coast of Oregon. The project was to be sited approximately 18 miles due west of Coos Bay, in over 1000 ft. of water, and is the first floating offshore wind array proposed in the United States, and the first offshore wind project of any kind proposed off the West Coast. PPI’s WindFloat, a semi-submersible foundation designed for high-capacity (6MW+) offshore wind turbines, is at the heart of the proposed project, and enables access to the world class wind resource at themore » project site and, equally, to other deep water, high wind resource areas around the country.« less

  3. Connected commercial vehicles-integrated truck project : final report.

    DOT National Transportation Integrated Search

    2014-01-01

    Connected vehicle wireless data communications can enable safety applications that may reduce crashes, injuries, and fatalities suffered on our roads and highways, as well as enabling reductions in traffic congestion and effects on the environment. A...

  4. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial actionmore » contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  5. The Dust Management Project: Final Report

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  6. Professional Development Capacity Building in Pennsylvania's Regional Staff Development Program: The "WorkNet" Project. Final Report [and] WorkNet Workplace Literacy Trainer's Guide.

    ERIC Educational Resources Information Center

    Carman, Priscilla S.

    These two documents are products of a project to improve the capability of the Pennsylvania Regional Staff Development Centers to provide current, research-based workplace literacy training and technical assistance to adult basic and literacy education programs. The final report describes these project activities: development of training materials…

  7. Evaluation of recycled projects for performance : final report.

    DOT National Transportation Integrated Search

    1995-04-01

    Louisiana constructed two hot mix recycling projects in 1978 in order to determine the feasibility of this technology with respect to design and construction. In 1980-81 four recycled projects were constructed to examine the variations found in recyc...

  8. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-07-01

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated inmore » the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan.« less

  9. Bulk transmission system component outage data base. Research project 1283-1. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Albrecht, P.F.; Heising, C.R.; Patton, A.D.

    1981-04-01

    This project is responsive to the premise that the successful analysis of equipment reliability and system adequacy in bulk transmission system planning and system operations requires data on equipment failure rates, maintenance outage rates and repair times. The objective of the project is to develop a system of consistent definitions, formats and procedures which can be used in the collection of such data in a well designed outage data bank. The project consisted of four interrelated phases, beginning with a review of related work and problem definition and ending with a discussion of data base organization and management. The reviewmore » of related work quickly pointed out that two schools of thought exist on data collection. One group contends that data should be collected on bulk transmission system physical equipments, such as transformers, circuit breakers, etc., and the other group supports data collection on functional transmission lines, including the terminal equipment, which have been defined as transmission units in this report. A compromise between these two approaches was imperative for successful completion of the work. The second phase investigated the data needed for reliability evaluation. The applications of the data bank were enumerated leading to a list of basic data needed when recording an incident. Phase 3 concentrated on developing procedures for data collection using forms to collect data both on outages and on the equipment design. Finally, the aspects of data base organization and management were explored and general recommendations made appropriate to this specific application. The project did not succeed in completely defining the procedures, particularly for multiple outages, but the ground work has been laid for a pilot data collection effort to refine the procedures before wide scale implementation by the utility industry.« less

  10. Project Artemis

    NASA Technical Reports Server (NTRS)

    Birchenough, Shawn; Kato, Denise; Kennedy, Fred; Akin, David

    1990-01-01

    The goals of Project Artemis are designed to meet the challege of President Bush to return to the Moon, this time to stay. The first goal of the project is to establish a permanent manned base on the Moon for the purposes of scientific research and technological development. The knowledge gained from the establishment and operations of the lunar base will then be used to achieve the second goal of Project Artemis, the establishment of a manned base on the Martian surface. Throughout both phases of the program, crew safety will be the number one priority. There are four main issues that have governed the entire program: crew safety and mission success, commonality, growth potential, and costing and scheduling. These issues are discussed in more detail.

  11. The Washington State Task Force on Student Transportation Safety. Final Report.

    ERIC Educational Resources Information Center

    Washington State Legislature, Olympia.

    Findings of a study conducted by the Washington State Task Force on Student Transportation Safety are presented in this report. The data-collection process involved four phases: meetings with experts in student transportation and pedestrian safety; public meetings, informational work sessions, and tours of problems areas; task force meetings; and…

  12. An Award-Winning Approach To Lead Safety.

    ERIC Educational Resources Information Center

    Compton-Lilly, Catherine

    2002-01-01

    Details how a lead safety project funded in the Toyota Tapestry Grant program provided students with the resources to test for and discover lead present in their recently renovated school. Discusses how the lead safety project played out across grade levels within the school. (DDR)

  13. Solar Energy Information and Education Project. Final Report.

    ERIC Educational Resources Information Center

    Hensley, Michael

    The New Mexico Solar Energy Institute (NMSEI) conducted a concentrated information and education program during 1985. This report summarizes NMSEI's Information and Education project activities. It provides detailed descriptions of project costs and concise recommendations for similar programs. Individual sections contain explanations of the scope…

  14. Developing a Highway Safety Fundamentals Course : Research Project Capsule

    DOT National Transportation Integrated Search

    2012-10-01

    Although the need for road : safety education was fi rst : recognized in the 1960s, : recently it has become an : increasingly urgent issue. To : fulfi ll the hefty goal set up by : the AASHTO Highway : Safety Strategy (cutting : traffi c fatalities ...

  15. Commercial vehicle (CV) retrofit safety device (RSD) kits project.

    DOT National Transportation Integrated Search

    2014-07-01

    Retrofit Safety Device (RSD) kits were developed and deployed on commercial vehicles as part of the U.S. DOT Connected Vehicle Safety Pilot to gain insight into the unique aspects of deploying connected vehicle technology in a commercial vehicle envi...

  16. Technology Education Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Appalachian Technology Education Consortium, Morgantown, WV.

    Year 1 of the Appalachian Technology Education Consortium Demonstration Project began with formation of an executive committee to serve as the managerial arm and establishment of a board of directors to determine policy direction. Other activities included planning for external evaluation, recruiting of demonstration and observer schools, and…

  17. Multiple Learning Strategies Project. Final Report.

    ERIC Educational Resources Information Center

    Danford, Jan

    This project researched and defined learning profiles for educable mentally impaired, visually impaired, low-reading, and regular vocational students based on the communication skills, attitudes toward self and others, knowledge level, and the cultural and social factors for each group. Through analysis of these profiles, and a consideration of…

  18. Industry Panel Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Kenneke, Larry J.

    This project was conducted to develop and disseminate updated curriculum guides for nine selected cluster areas of vocational education programs in Oregon; only five were developed. The updates were based on recommendations made by industry review panels (IRPs). Specialists from the Oregon Department of Education and Oregon State University…

  19. Project Sell, Title VII: Final Evaluation 1970-1971.

    ERIC Educational Resources Information Center

    Condon, Elaine C.; And Others

    This evaluative report consists of two parts. The first is a narrative report which represents a summary by the evaluation team and recommendations regarding project activities; the second part provides a statistical analysis of project achievements. Details are provided on evaluation techniques, staff, management, instructional materials,…

  20. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less