Sample records for project final summary

  1. Competency-Based Transfer Pilot Project--Final Report. Executive Summary [and] Competency-Based Transfer Pilot Project: Final Report on House Bill 1909

    ERIC Educational Resources Information Center

    Washington Higher Education Coordinating Board, 2006

    2006-01-01

    This publication contains the following: (1) Competency-Based Transfer Pilot Project--Final Report. Executive Summary (January 2006); and (2) Competency-Based Transfer Pilot Project: Final Report on House Bill 1909 (January 2005). In 2003, the legislature and governor enacted House Bill 1909 to create a pilot project on competency-based transfer…

  2. Project Developmental Continuity Evaluation: Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Bond, James T.; Rosario, Jose

    This executive summary presents the major results of the longitudinal evaluation of Project Developmental Continuity (PDC). A Head Start demonstration project initiated by the Administration for Children, Youth and Families (ACYF) in 1974, the PDC aimed to stimulate the development and implementation of comprehensive programs linking Head Start…

  3. Portland cement concrete pavement restoration : final summary report.

    DOT National Transportation Integrated Search

    1988-07-01

    This final summary report is comprised of an Initial Construction Report; a Final Report; and two Interim Reports. These reports document the construction of Louisiana's Portland Cement Concrete Pavement Restoration project and its performance during...

  4. ALPBP Project Research Component: Summary of Research Findings and Final Reports.

    ERIC Educational Resources Information Center

    Rivera, Charlene

    This report summarizes the Assessment of Language Proficiency of Bilingual Persons (ALPBP) project research component and provides a summary of the findings of the other six components of the study. The summary of the research component includes an outline of the goals, activities, and requests for proposals. After the introduction, the following…

  5. Space station final study report. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1987-01-01

    Volume 1 of the Final Study Report provides an Executive Summary of the Phase B study effort conducted under contract NAS8-36526. Space station Phase B implementation resulted in the timely establishment of preliminary design tasks, including trades and analyses. A comprehensive summary of project activities in conducting this study effort is included.

  6. The Viking project. [summary

    NASA Technical Reports Server (NTRS)

    Soffen, G. A.

    1977-01-01

    The Viking project launched two unmanned spacecraft to Mars in 1975 for scientific exploration with special emphasis on the search for life. Each spacecraft consisted of an orbiter and a lander. The landing sites were finally selected after the spacecraft were in orbit. Thirteen investigations were performed: three mapping experiments from the orbiter, one atmospheric investigation during the lander entry phase, eight experiments on the surface of the planet, and one using the spacecraft radio and radar systems. The experiments on the surface dealt principally with biology, chemistry, geology, and meteorology. Seventy-eight scientists have participated in the 13 teams performing these experiments. This paper is a summary of the project and an introduction to the articles that follow.

  7. The 1990-1991 project summaries

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Georgia Tech's School of Textile & Fiber Engineering and School of Mechanical Engineering participated in four cooperative design efforts this year. One group designed a thermal shield for a lunar telescope. The second group designed a selenotextile habitat shielding structure. The third group designed a pneumatically assisted elbow joint for the NASA zero-prebreathe suit (ZPS). The final group designed an electromechanical system to power an astronaut's finger joints. Summaries of these projects are presented.

  8. The 1990-1991 project summaries

    NASA Astrophysics Data System (ADS)

    Georgia Tech's School of Textile & Fiber Engineering and School of Mechanical Engineering participated in four cooperative design efforts this year. One group designed a thermal shield for a lunar telescope. The second group designed a selenotextile habitat shielding structure. The third group designed a pneumatically assisted elbow joint for the NASA zero-prebreathe suit (ZPS). The final group designed an electromechanical system to power an astronaut's finger joints. Summaries of these projects are presented.

  9. 7 CFR 3402.12 - Project summary.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project summary. 3402.12 Section 3402.12 Agriculture... AGRICULTURAL SCIENCES NATIONAL NEEDS GRADUATE AND POSTGRADUATE FELLOWSHIP GRANTS PROGRAM Preparation of an Application § 3402.12 Project summary. Using the Project Summary, Form NIFA-2003, applicants must summarize...

  10. 7 CFR 3402.12 - Project summary.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Project summary. 3402.12 Section 3402.12 Agriculture... AGRICULTURAL SCIENCES NATIONAL NEEDS GRADUATE AND POSTGRADUATE FELLOWSHIP GRANTS PROGRAM Preparation of an Application § 3402.12 Project summary. Using the Project Summary, Form NIFA-2003, applicants must summarize...

  11. 7 CFR 3402.12 - Project summary.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project summary. 3402.12 Section 3402.12 Agriculture... AGRICULTURAL SCIENCES NATIONAL NEEDS GRADUATE AND POSTGRADUATE FELLOWSHIP GRANTS PROGRAM Preparation of an Application § 3402.12 Project summary. Using the Project Summary, Form NIFA-2003, applicants must summarize...

  12. 7 CFR 3402.12 - Project summary.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Project summary. 3402.12 Section 3402.12 Agriculture... AGRICULTURAL SCIENCES NATIONAL NEEDS GRADUATE AND POSTGRADUATE FELLOWSHIP GRANTS PROGRAM Preparation of an Application § 3402.12 Project summary. Using the Project Summary, Form CSREES-2003, applicants must summarize...

  13. 7 CFR 3402.12 - Project summary.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project summary. 3402.12 Section 3402.12 Agriculture Regulations of the Department of Agriculture (Continued) COOPERATIVE STATE RESEARCH, EDUCATION, AND EXTENSION... FELLOWSHIP GRANTS PROGRAM Preparation of an Application § 3402.12 Project summary. Using the Project Summary...

  14. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN. PROJECT SUMMARY

    EPA Science Inventory

    This document is an eight page summary of the final report on arsenic demonstration project at Climax, MN (EPA/600/R-06/152). The objectives of the project are to evaluate the effectiveness of the Kinetico iron removal system in removing arsenic to meet the new arsenic maximum co...

  15. Skills Conversion Project: Chapter 2, Executive Summary. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    This final report describes the Skills Conversion Project conducted by The National Society of Professional Engineers under contract to the Department of Labor to study methods of utilizing the large pool of highly skilled unemployed technicians and professional personnel who were formerly employed in the aerospace and defense industries. If…

  16. The Choctaw Home-Centered Family Education Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Quigley, Patrick A.; And Others

    The final report of the four-year (1972-1976) Choctaw Family Education Project identifies the major goal, "to demonstrate a workable early childhood model for rural reservation groups," and consists of an executive summary, a comprehensive report, and a personalized report. Objectives of the project, carried out in 6 Choctaw reservation…

  17. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. U.S. EPA DEMONSTRATION PROJECT AT SPRINGFIELD, OH. PROJECT SUMMARY

    EPA Science Inventory

    This document is a eight page summary of the final report on arsenic demonstration project at the Chateau Estates Mobile Home Park in Springfield, OH. The objectives of the project are to evaluate the effectiveness of AdEdge Technologies’ AD-33 media in removing arsenic to meet t...

  18. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanson, David

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  19. Hawaii Demonstration Project to Avert Unintended Teenage Pregnancy: 1978-1982. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Levitt-Merin, Marta; Sutter, Sharon Kingdon

    This final report provides a descriptive overview of three approaches which the Hawaii Demonstration Project initiated to reduce unintended teenage pregnancies. Project evaluation findings are summarized; both qualitative and quantitative data are presented for a comprehensive picture of the project and its input. Project limitations and successes…

  20. 77 FR 30514 - Native Hawaiian Career and Technical Education Program; Final Waiver and Extension of Project Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native Hawaiian Career and Technical Education Program; Final Waiver and.... ACTION: Notice. Overview Information Final Waiver and Extension of Project Period for the Native Hawaiian.... SUMMARY: For 36-month projects funded in fiscal year (FY) 2009 under the Native Hawaiian Career and...

  1. Budget Period 1 Summary Report: Hywind Maine Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keiser, Meagan

    2014-02-28

    In accordance with the Statement of Project Objectives (SOPO) agreed to between the Department of Energy (“DOE”) and Statoil for the Hywind Maine project, Statoil hereby submits a Budget Period 1 Summary Report which includes accomplishments for the project. The report includes summaries of the other submitted reports (see Section 1.2-2) and progress regarding innovations leading to potential reductions in the Cost of Energy (see Section 3). The Hywind Demo project, the world’s first full-scale 2.3 megawatts (MW) floating wind turbine, installed at a water depth of 200 meter (m), 10 kilometer (km) off the coast of Norway, has provenmore » that the Hywind floating substructure is a suitable platform for conventional multi- MW turbines. A principal goal of the Hywind Maine Project was to leverage that experience, both to demonstrate the commercial feasibility of the technology and to further develop and optimize the technology all in order to bring the costs down in a larger scale development. With the Hywind Maine Project, Statoil planned to deploy four turbines of 3 MW in approximately 140 meters water depth. Although the project in Maine will not move forward, much value was gained through the BP1 work package. Advanced modeling related to the design basis, which will have applicability beyond the Maine project, was completed. In addition, initial supply chain analyses were conducted, which will help assist with development of updated cost of energy models. Geophysical and various environmental surveys were also conducted, the results of which Statoil has committed to share publicly, and which will help build a database of information that future developers may be able to access. Finally, Statoil gained a greater understanding of the US offshore wind industry and related markets, which will assist the company as it looks for full-scale, commercial opportunities.« less

  2. The 1990-1991 project summaries

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Project summaries for 1990-91 at the Georgia Institute of Technology are presented. The following research projects were studied: a lunar surface vehicle model; lunar loader/transporter; trenching and cable-laying device for the lunar surface; a lunar vehicle system for habitat transport and placement; and lunar storage facility.

  3. 78 FR 57264 - Final Waiver and Extension of the Project Period for the Technical Assistance Coordination Center

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ...: 84.326Z.] Final Waiver and Extension of the Project Period for the Technical Assistance Coordination... project period. SUMMARY: The Secretary waives the requirements in the Education Department General Administrative Regulations that generally prohibit project periods exceeding five years and extensions of project...

  4. Evaluation of Supported Placements in Integrated Community Environments Project (SPICE). Executive Summary of the Final Report.

    ERIC Educational Resources Information Center

    Wilson, Leslie; And Others

    This executive summary presents highlights of a study which sought to determine whether participants in the Supported Placements in Integrated Community Environments project were better off after moving to community homes from intermediate care facilities and skilled nursing facilities, and to determine the variables that contribute to quality…

  5. Project English Summaries, March 1970.

    ERIC Educational Resources Information Center

    Haughey, Charles F.; And Others

    Information concerning Project English, which is being carried out at 14 universities and 1 State Department of Education through the support of the Office of Education, is provided in summary format. Project English is concerned with the development of English curriculum for Grades K through 12 and with the development of curriculum for…

  6. Vocational Evaluation and Work Adjustment Bulletin; Vol. 8, Special Edition: Vocational Evaluation Project Final Report Part 1.

    ERIC Educational Resources Information Center

    Vocational Evaluation and Work Adjustment Association, Washington, DC.

    The first of three parts of the Vocational Evaluation Project final report contains an editorial, two task force reports, and brief summaries of the seven task force reports which comprise the final report. The editorial summarizes the project's purpose, its activities for the three years of its existence, and its results, and describes the task…

  7. 77 FR 66480 - Final Environmental Impact Statement, Narrows Project, Sanpete County, Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... availability. SUMMARY: We, the Bureau of Reclamation, announce the availability of the final environmental impact statement on the Narrows Project, a non- Federal dam and reservoir proposed by the Sanpete Water... Availability of Weekly Receipt of Environmental Impact Statements in the Federal Register. This notice, usually...

  8. Satellite Applications for Public Service: Project Summaries.

    ERIC Educational Resources Information Center

    Lauffer, Sandra; And Others

    Summaries of 18 different projects involving the use of satellite communications are presented in this report, including PEACESAT Education and Communication Experiments, USP Network Satellite Communication Project, Project Satellite, Satellite Instructional Television Experiment (SITE), Appalachian Education Satellite Program, Alaska Education…

  9. Midwest Forensics Resource Center Project Summary June 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Baldwin

    The mission of the MFRC Research and Development Program, is to provide technological advances in forensic science for the benefit of our regional partners as well as the forensic community at large. Key areas of forensic science need are identified through our interactions with our Midwest partners and our R&D advisory group, as well as through our participation in national meetings in forensic science. Under the sponsorship of the National Institute of Justice, the MFRC solicits proposals for the development of practical and useful technology, instrumentation, and methodology that address needs in areas related to forensic science and its applicationmore » to operational crime laboratories. The MFRC facilitates proposal development by working to establish partnerships between researchers and our regional partners. The MFRC administers a peer-review of the proposals and then funds the selected projects at a cost of approximately $55,000 each, with a 12-month period of performance. The process for selection of these projects includes the following steps: (1) drafting of a call for proposals by MFRC staff, (2) review of the draft call by members of the R&D advisory committee, (3) review and approval of the call by NIJ, (4) issuance of the call to ISU, Ames Laboratory, regional partners, and research organizations, (5) receipt of proposals, (6) review of proposals by R&D advisory committee, (7) ranking and selection by MFRC staff using advisory committee reviews, with concurrence by NIJ, (8) notification of proposers, (9) receipt and review of progress reports by MFRC, (10) receipt and review of final reports by MFRC, R&D advisory committee, and NIJ. The decision to fund any specific project is based upon a peer-reviewed call-for-proposal system administered by the MFRC. The reviewers are crime laboratory specialists and scientists who are asked to rate the proposals on four criteria areas including: (1) relevance to the mission of the MFRC, (2) technical approach

  10. Final Scientific Report - Wind Powering America State Outreach Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sinclair, Mark; Margolis, Anne

    2012-02-01

    The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America Statemore » Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.« less

  11. Experiments in Mental Health Training. Project Summaries.

    ERIC Educational Resources Information Center

    Silverstein, Sam, Ed.; And Others

    This report contains summaries of mental health training projects conducted under grants awarded by the Experimental and Special Training Branch of the Division of Manpower and Training Programs. The projects have been developed in both academic and non-academic settings for professional, subprofessional, and nonprofessional training for a variety…

  12. Fusion plasma theory project summaries

    NASA Astrophysics Data System (ADS)

    1993-10-01

    This Project Summary book is a published compilation consisting of short descriptions of each project supported by the Fusion Plasma Theory and Computing Group of the Advanced Physics and Technology Division of the Department of Energy, Office of Fusion Energy. The summaries contained in this volume were written by the individual contractors with minimal editing by the Office of Fusion Energy. Previous summaries were published in February of 1982 and December of 1987. The Plasma Theory program is responsible for the development of concepts and models that describe and predict the behavior of a magnetically confined plasma. Emphasis is given to the modelling and understanding of the processes controlling transport of energy and particles in a toroidal plasma and supporting the design of the International Thermonuclear Experimental Reactor (ITER). A tokamak transport initiative was begun in 1989 to improve understanding of how energy and particles are lost from the plasma by mechanisms that transport them across field lines. The Plasma Theory program has actively participated in this initiative. Recently, increased attention has been given to issues of importance to the proposed Tokamak Physics Experiment (TPX). Particular attention has been paid to containment and thermalization of fast alpha particles produced in a burning fusion plasma as well as control of sawteeth, current drive, impurity control, and design of improved auxiliary heating. In addition, general models of plasma behavior are developed from physics features common to different confinement geometries. This work uses both analytical and numerical techniques. The Fusion Theory program supports research projects at U.S. government laboratories, universities and industrial contractors. Its support of theoretical work at universities contributes to the office of Fusion Energy mission of training scientific manpower for the U.S. Fusion Energy Program.

  13. Vocational Evaluation and Work Adjustment Bulletin; Vol. 8, Special Edition: Vocational Evaluation Project Final Report Part 2.

    ERIC Educational Resources Information Center

    Vocational Evaluation and Work Adjustment Association, Washington, DC.

    Part 2 of the three-part Vocational Evaluation Project final report contains brief summaries of the seven task force report which comprise the final report and two such task force reports. The report of task force 5, Standards for Vocational Evaluation, describes the task force's effort to study the standards for accreditation presently used by…

  14. DE-NE0000735 - FINAL REPORT ON THORIUM FUEL CYCLE NEUP PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krahn, Steven; Ault, Timothy; Worrall, Andrew

    The report is broken into six chapters, including this executive summary chapter. Following an introduction, this report discusses each of the project’s three major components (Fuel Cycle Data Package (FCDP) Development, Thorium Fuel Cycle Literature Analysis and Database Development, and the Thorium Fuel Cycle Technical Track and Proceedings). A final chapter is devoted to summarization. Various outcomes, publications, etc. originating from this project can be found in the Appendices at the end of the document.

  15. 77 FR 30512 - Native American Career and Technical Education Program; Final Waivers and Extension of Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native American Career and Technical Education Program; Final Waivers and... American Career and Technical Education Program Catalog of Federal Domestic Assistance (CFDA) Number: 84.101A. SUMMARY: For 60-month projects funded in fiscal year (FY) 2007 under the Native American Career...

  16. Northwest Energy Policy Project. Energy conservation policy evaluation: study module IA. Final report. Volume I. Summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berney, R.E.; Butcher, W.R.; Carter, L.F.

    1977-01-01

    This summary report identifies potential energy conservation measures and evaluates measures and policy options not likely to be suitable for adoption in the Pacific Northwest. Potential and incentives for energy conservation are specifically identified in the residential, commercial, industrial, and transportation sectors and through urban design. Selection of preferable policies and estimation of response to policies are next discussed. Finally, a computer impact model for calculating energy savings and changes in the levels of residuals resulting from energy conservation activities is discussed. (MCW)

  17. DOE passive solar commercial buildings program: project summaries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-01-01

    The 23 projects participating in this program comprise a wide range of building types including offices, retail establishments, educational facilities, public service facilities, community and visitor centers, and private specialized-use facilities, located throughout the United States. Summary data and drawings are presented for each project. (MHR)

  18. LSCA Final Reports: Second Series.

    ERIC Educational Resources Information Center

    Clark, Collin, Ed.

    This document includes final summary reports from recent federally funded Library Services and Construction Act (LSCA) demonstration projects in California. While some projects reported at length and others provided the bare facts, reports are excerpted but published as received, without editing beyond a uniform first page. The Summary Report Form…

  19. Ice2sea - Estimating the future contribution of continental ice to sea-level rise - project summary

    NASA Astrophysics Data System (ADS)

    Ford, Elaina; Vaughan, David

    2013-04-01

    Ice2sea brings together the EU's scientific and operational expertise from 24 leading institutions across Europe and beyond. Improved projections of the contribution of ice to sea-level rise produced by this major European-funded programme will inform the fifth IPCC report (due in September 2013). In 2007, the fourth Intergovernmental Panel on Climate Change (IPCC) report highlighted ice-sheets as the most significant remaining uncertainty in projections of sea-level rise. Understanding about the crucial ice-sheet effects was "too limited to assess their likelihood or provide a best estimate of an upper bound for sea-level rise". Ice2sea was created to address these issues - the project started in 2009 and is now drawing to a close, with our final symposium in May 2013, and final publicity activities around the IPCC report release in autumn 2013. Here we present a summary of the overall and key outputs of the ice2sea project.

  20. Experimental plasma research project summaries

    NASA Astrophysics Data System (ADS)

    1992-06-01

    This is the latest in a series of Project Summary books that date back to 1976. It is the first after a hiatus of several years. They are published to provide a short description of each project supported by the Experimental Plasma Research Branch of the Division of Applied Plasma Physics in the Office of Fusion Energy. The Experimental Plasma Research Branch seeks to provide a broad range of experimental data, physics understanding, and new experimental techniques that contribute to operation, interpretation, and improvement of high temperature plasma as a source of fusion energy. In pursuit of these objectives, the branch supports research at universities, DOE laboratories, other federal laboratories, and industry. About 70 percent of the funds expended are spent at universities and a significant function of this program is the training of students in fusion physics. The branch supports small- and medium-scale experimental studies directly related to specific critical plasma issues of the magnetic fusion program. Plasma physics experiments are conducted on transport of particles and energy within plasma. Additionally, innovative approaches for operating, controlling, and heating plasma are evaluated for application to the larger confinement devices of the magnetic fusion program. New diagnostic approaches to measuring the properties of high temperature plasmas are developed to the point where they can be applied with confidence on the large-scale confinement experiments. Atomic data necessary for impurity control, interpretation of diagnostic data, development of heating devices, and analysis of cooling by impurity ion radiation are obtained. The project summaries are grouped into the three categories of plasma physics, diagnostic development, and atomic physics.

  1. Cost Model/Data Base Catalog Non-DoD/Academic Survey. Volume 1. Project Summary

    DTIC Science & Technology

    1988-10-30

    presented in two volumes: Volume 1- Project Summary, and L .JD Volume 2- Final Data Base. J Accesion - For NTIS C R A& Disiji( .. . U, L)~ .6I...218 47I I I I I I I I Exhibit 111-3. COMPLETE CATALOG BREAKOUT I MANAGEMENT CONSULTING & RESEARCH, INC. j 111-6 I IE-I Iu 0 HE-4 X C.) E- Ix UI.n 111...College/EDCCAir University Maxwell Air Force Base, AL 36112 2. AD (Armament Division) Department of the Air Force Armament Division/(subdiv code

  2. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  3. Project Sell, Title VII: Final Evaluation 1970-1971.

    ERIC Educational Resources Information Center

    Condon, Elaine C.; And Others

    This evaluative report consists of two parts. The first is a narrative report which represents a summary by the evaluation team and recommendations regarding project activities; the second part provides a statistical analysis of project achievements. Details are provided on evaluation techniques, staff, management, instructional materials,…

  4. System Re-engineering Project Executive Summary

    DTIC Science & Technology

    1991-11-01

    Management Information System (STAMIS) application. This project involved reverse engineering, evaluation of structured design and object-oriented design, and re- implementation of the system in Ada. This executive summary presents the approach to re-engineering the system, the lessons learned while going through the process, and issues to be considered in future tasks of this nature.... Computer-Aided Software Engineering (CASE), Distributed Software, Ada, COBOL, Systems Analysis, Systems Design, Life Cycle Development, Functional Decomposition, Object-Oriented

  5. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  6. Summary of Public Comments and Responses for Final NESHAP for Pharmaceuticals Production

    EPA Pesticide Factsheets

    This document provides summaries of public comments and EPA responses related to the final standards for the reduction of hazardous air pollutants (HAP) emitted through the manufacture of pharmaceutical products

  7. Fundamentals of Tribology Workshop Held at the University of Florida, Gainesville, Florida on 10-11 May 2010: Project Summary

    DTIC Science & Technology

    2010-05-01

    to prevent fouling • Environmental Materials Water and hydrocarbons as third bodies Controllable friction (thermal, stress, chemical induced...Final Report Air Force Grant # FA9550-10-1-0261 Fundamentals of Tribology Workshop For the period: 03/17/2020-02/14/2011 Contract... Tribology An AFOSR Sponsored Workshop Gainesville, FL May 2010 Project Summary On May 10-11, 2010, leading scientists and engineers of the

  8. The Amherst Project. Final Report.

    ERIC Educational Resources Information Center

    Hampshire Coll., Amherst, MA.

    This final report submitted by the Committee on the Study of History at Hampshire College describes the Amherst Project, a research and development project devoted to fostering the newer inquiry approaches in the study of United States history. The project's main focus has been on secondary schools, but has also encompassed junior high and adult…

  9. IRIS TOXICOLOGICAL REVIEW AND SUMMARY DOCUMENTS FOR CHLORDECONE (KEPONE) (2009 FINAL)

    EPA Science Inventory

    EPA is announcing the release of the final report, Toxicological Review of Chlorodecone (kepone): in support of the Integrated Risk Information System (IRIS). The updated Summary for Chlordecone (kepone) and accompanying Quickview have also been added to the IRIS Database....

  10. Adult Basic Education Outreach Project. Final Report (Executive Summary).

    ERIC Educational Resources Information Center

    Alberta Vocational Centre, Edmonton.

    An executive report summarizes the Alberta Vocational Centre's development of a portable individualized, competency-based learning system for use in an adult basic education program in a non-institutional community location. The report deals with the project's rationale, development (including management, curricular development, budget, and site…

  11. Final Report for NMBSA Project, Monika Kaden, 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ward, William Carl

    The following pages define the objectives and results for Project 022, requested by Monika Kaden, a sculptor who maintains studios in Santa Fe. This effort was first approved in February 2016, and was completed during several different time segments spread over the year, depending on Monika’s availability. The project deliverables that are of primary use to the customer are digital data files that are to be delivered electronically. This report is a summary overview of how the project was conducted.

  12. American Issues Forum: Active Projects--Summary Report [And] Nationally Circulated Materials.

    ERIC Educational Resources Information Center

    National Endowment for the Humanities (NFAH), Washington, DC.

    These two reports briefly describe the active projects and nationally circulated mateirals associated with the American Issues Forum Bicentennial Programs. The summary report of active projects is designed to show how various national media, national and international organizations, corporations, and state and community groups are actively…

  13. AVST Morphing Project Research Summaries in Fiscal Year 2001

    NASA Technical Reports Server (NTRS)

    McGowan, Anna-Maria R.

    2002-01-01

    The Morphing project at the National Aeronautics and Space Agency's Langley Research Center is part of the Aerospace Vehicle Systems Program Office that conducts fundamental research on advanced technologies for future flight vehicles. The objectives of the Morphing project are to develop and assess advanced technologies and integrated component concepts to enable efficient, multi-point adaptability in air and space vehicles. In the context of the project, the word "morphing" is defined as "efficient, multi-point adaptability" and may include micro or macro, structural or fluidic approaches. The current document on the Morphing project is a compilation of research summaries and other information on the project from fiscal year 2001. The focus of this document is to provide a brief overview of the project content, technical results and lessons learned from fiscal year 2001.

  14. Research Summary: Projecting Vegetation and Wildfire Response to Changing Climate and Fire Management in Interior Alaska

    DTIC Science & Technology

    2016-08-21

    USER GUIDE Research Summary: Projecting Vegetation and Wildfire Response to Changing Climate and Fire Management in Interior Alaska SERDP Project...Summary: Projecting Vegetation and Wildfire Response to Changing Climate and Fire Management in Interior Alaska 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER...forecast landscape change in response to projected changes in climate , fire regime, and fire management. 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF

  15. Mechanistic-empirical design, implementation, and monitoring for flexible pavements : a project summary.

    DOT National Transportation Integrated Search

    2014-05-01

    This document is a summary of tasks performed for Project ICT-R27-060. : Mechanistic-empirical (M-E)based flexible pavement design concepts and procedures were : developed in previous Illinois Cooperative Highway Research Program projects (IHR-510...

  16. Project LIFE, 1963-1975. Final Report.

    ERIC Educational Resources Information Center

    Pfau, Glenn S.

    Presented is the final report on Project Life (Language Improvement to Facilitate Education), a 12-year (1963-75) project which developed filmstrips and supplementary materials for teaching language to deaf children. General overview and historical review sections include information on project goals and objectives, administration agencies and…

  17. NASA Remediation Technology Collaboration Development Task, Overview and Project Summaries

    NASA Technical Reports Server (NTRS)

    Romeo, James G.

    2014-01-01

    An overview presentation of NASA's Remediation Technology Collaboration Development Task including the following project summaries: in situ groundwater monitor, in situ chemical oxidation, in situ bioremediation, horizontal multi-port well, and high resolution site characterization.

  18. LSCA Final Reports: Third Series.

    ERIC Educational Resources Information Center

    Clark, Collin, Ed.

    This document includes final summary reports from 16 recent federally funded Library Services and Construction Act (LSCA) projects in California. This volume covers generally the period 1984-85, and reports are presented in six subject areas: programs for children, information and referral projects, institutional services, literacy, local history,…

  19. The National Evaluation of School Nutrition Programs. Final Report - Executive Summary.

    ERIC Educational Resources Information Center

    Radzikowski, Jack

    This is a summary of the final report of a study (begun in 1979) of the National School Lunch, School Breakfast, and Special Milk Programs. The major objectives of the evaluation were to (1) identify existing information on the school nutrition programs; (2) identify determinants of participation in the programs and develop statistical models for…

  20. The Trine Project Final Report.

    ERIC Educational Resources Information Center

    Gunderson, Jon R.; And Others

    The final report describes the Trine Project which addressed three needs in the education of handicapped children: the need for an alternate writing system, the need for communication, and the need for access to general purpose computers used in the schools. The project had three major objectives: (1) to design a low-cost portable writing and…

  1. Comparative analysis of structural concrete Quality Assurance practices on nine nuclear and three fossil fuel power plant construction projects. Final summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.J. Jr.

    1978-12-01

    A summary of two reports, COO/4120-1 and COO/4120-2, is given. A comparative analysis was made of the Quality Assurance practices related to the structural concrete phase on nine nuclear and three fossil fuel power plant projects which are (or have been) under construction in the United States in the past ten years. For the nuclear projects the analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. For the fossil projects the analysis identified the response of each Qualitymore » Assurance program to criteria similar to those which were applicable in the nuclear situation. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects.« less

  2. Effective Classroom Management and Instruction: An Exploration of Models. Executive Summary of Final Report.

    ERIC Educational Resources Information Center

    Evertson, Carolyn M.; And Others

    A summary is presented of the final report, "Effective Classroom Management and Instruction: An Exploration of Models." The final report presents a set of linked investigations of the effects of training teachers in effective classroom management practices in a series of school-based workshops. Four purposes were addressed by the study: (1) to…

  3. Manufacturing Methods and Technology Project Summary Reports.

    DTIC Science & Technology

    1983-12-01

    25 .4B 1.4 MICROCOPY RESOLUTION TEST CHART NATIONAL @u9(Au OF STANDAROS , 6 ’A % . a us$ARMY ,$. ’ AREA00S D 0- ilC’ , ATIh FO WWFC RN 7 i rI 444 . 4 ...NUMBER 4 . TITLE (end Subtitle) TYPE OF REPORT & PERIOD COVERED MA NU FACTURING MTOSADTECHNOLOGY PROJECT SUMMARY REPORTS Semi-Annual - Jul - Dec 1983 6 ...material. 4 . Improve substrate attachment. S5. Optimize pin swaging and soldering. 6 . Design a hybrid cover for the current uncased circuit. The

  4. A Model System for the Design and Maintenance of Related Instruction Curriculum for Approved U.S. Department of Labor Apprenticeship Programs; Phase III. Final Report and Final Evaluation Report.

    ERIC Educational Resources Information Center

    Lane Community Coll., Eugene, OR.

    A final report and final evaluation report of Phase III are provided for a project to establish a national clearinghouse for apprenticeship-related instructional materials. The final report provides a summary and a narrative account of these project activities: identification of materials; identification of apprenticeship curriculum needs;…

  5. Evaluation of Nuclear Facility Decommissioning Projects program: a reference research reactor. Project summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baumann, B.L.; Miller, R.L.

    1983-10-01

    This document presents, in summary form, generic conceptual information relevant to the decommissioning of a reference research reactor (RRR). All of the data presented were extracted from NUREG/CR-1756 and arranged in a form that will provide a basis for future comparison studies for the Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program.

  6. Mechanistic-Empirical (M-E) Design Implementation & Monitoring for Flexible Pavements : 2018 PROJECT SUMMARY

    DOT National Transportation Integrated Search

    2018-06-01

    This document is a summary of the tasks performed for Project ICT-R27-149-1. Mechanistic-empirical (M-E)based flexible pavement design concepts and procedures were previously developed in Illinois Cooperative Highway Research Program projects IHR-...

  7. NASA's Morphing Project Research Summaries in Fiscal Year 2002

    NASA Technical Reports Server (NTRS)

    McGowan, Anna-Maria R.; Waszak, Martin R.

    2005-01-01

    The Morphing Project at the National Aeronautics and Space Agency s (NASA) Langley Research Center (LaRC) is part of the Breakthrough Vehicle Technologies Project, Vehicle Systems Program that conducts fundamental research on advanced technologies for future flight vehicles. The objectives of the Morphing Project are to develop and assess the advanced technologies and integrated component concepts to enable efficient, multi-point adaptability of flight vehicles; primarily through the application of adaptive structures and adaptive flow control to substantially alter vehicle performance characteristics. This document is a compilation of research summaries and other information on the project for fiscal year 2002. The focus is to provide a brief overview of the project content, technical results and lessons learned. At the time of publication, the Vehicle Systems Program (which includes the Morphing Project) is undergoing a program re-planning and reorganization. Accordingly, the programmatic descriptions of this document pertain only to the program as of fiscal year 2002.

  8. Final Project Report for Award ER65581

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stoy, Paul C.

    2017-07-13

    The attached final project report describes contributions of Montana State University (MSU) to the project "Bridging land-surface fluxes and aerosol concentrations to triggering convective rainfall" (PI: Fuentes).

  9. Illinois Clean Coal Institute 2005 annual report. Final technical report for the period September 1st, 2004, through August 31, 2005 on projects funded by the Illinois Department of Commerce and Economic Opportunity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2005-11-08

    This final technical report contains the abstracts and executive summaries of projects funded through the Illinois Clean Coal Institute solicitation entitled 'Request for proposals No. 04-1(ICCI/RFP04-1)'. Support of these projects is by the Office of Coal Development and Department of Commerce and Economic Opportunity. The projects fall into the following categories: advanced coal mining technologies; coal preparation and coal production business practice; management of coal combustion byproducts; commercialization and technology transfer. Final project extensions are also recorded.

  10. Mechanical Engineering Senior Design Project Final Presentations | College

    Science.gov Websites

    Mechanical Engineering Senior Design Project Final Presentations December 7, 2015 Mechanical Engineering On Wednesday, Dec. 9th, the mechanical engineering senior design project final presentations will be made in and Steven Keller Objective: Design a temperature controlled unit that would cool and maintain a

  11. 75 FR 19670 - Marine Highway Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration Marine Highway Projects ACTION: Solicitation of applications for Marine highway projects. SUMMARY: The Department of Transportation is soliciting applications for Marine Highway Projects as specified in the America's Marine Highway Program Final Rule, MARAD...

  12. El Toro Library Solar Heating and Cooling Demonstration Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report is divided into a number of essentially independent sections, each of which covers a specific topic. The sections, and the topics covered, are as follows. Section 1 provides a brief summary description of the solar energy heating and cooling system including the key final design parameters. Section 2 contains a copy of the final Acceptance Test Report. Section 3 consists of a reduced set of final updated as-built mechanical, electrical, control and instrumentations drawings of the solar energy heating and cooling system. Section 4 provides a summary of system maintenance requirements, in the form of a maintenance schedulemore » which lists necessary maintenance tasks to be performed at monthly, quarterly, semi-annual, and annual intervals. Section 5 contains a series of photographs of the final solar energy system installation, including the collector field and the mechanical equipment room. Section 6 provides a concise summary of system operation and performance for the period of December 1981 through June 1982, as measured, computed and reported by Vitro Laboratories Division of Automation Industries, Inc., for the DOE National Solar Data Network. Section 7 provides a summary of key as-built design parameters, compared with the corresponding original design concept parameters. Section 8 provides a description of a series of significant problems encountered during construction, start-up and check-out of the solar energy heating and cooling system, together with the method employed to solve the problem at the time and/or recommendations for avoiding the problem in the future design of similar systems. Appendices A through H contain the installation, operation and maintenance submittals of the various manufacturers on the major items of equipment in the system. Reference CAPE-2823.« less

  13. 76 FR 64085 - Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... power allocation. SUMMARY: The Western Area Power Administration (Western), a Federal power marketing..., Final Power Allocation developed under the requirements of subpart C-Power Marketing Initiative of the Energy Planning and Management Program (Program) Final Rule, 10 CFR part 905. These final power...

  14. NASA Redox Project status summary

    NASA Technical Reports Server (NTRS)

    Hagedorn, N. H.

    1983-01-01

    This report is a summary of the results of the Redox Project effort during Cy 1982. It was presented at the Fifth U.S. Department of Energy Battery and Electrochemical Contractors Conference, Arlington, Va., Dec. 7-9, 1982. The major development during 1982 was the shift from Redox system operation at 25 C with unmixed reactants to operation at 65 C with mixed reactants. This change has made possible a two- or three-fold increase in operating current density, to about 65 mA/sq cm, and an increase in reactant utilization from 40% to about 90%. Both of these improvements will lead to significant system cost reductions. Contract studies have indicated that Redox reactant costs also will be moderate. A new catalyst for the chromuim electrode offers all the advantages of the conventional gold-lead catalyst while being easier to apply and more forgiving in use.

  15. 2+2+2 Dissemination Project Final Report.

    ERIC Educational Resources Information Center

    Sloane, Diana; And Others

    An overview is provided in this three-part final report of a project designed to disseminate information to assist California high schools, Regional Occupation Programs, and colleges in developing and strengthening 2+2+2 programs. Part I reviews the following project objectives: (1) hire a project coordinator and technical assistant; (2) develop a…

  16. Urban Options Solar Greenhouse Demonstration Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  17. Project analysis and integration economic analyses summary

    NASA Technical Reports Server (NTRS)

    Macomber, H. L.

    1986-01-01

    An economic-analysis summary was presented for the manufacture of crystalline-silicon modules involving silicon ingot/sheet, growth, slicing, cell manufacture, and module assembly. Economic analyses provided: useful quantitative aspects for complex decision-making to the Flat-plate Solar Array (FSA) Project; yardsticks for design and performance to industry; and demonstration of how to evaluate and understand the worth of research and development both to JPL and other government agencies and programs. It was concluded that future research and development funds for photovoltaics must be provided by the Federal Government because the solar industry today does not reap enough profits from its present-day sales of photovoltaic equipment.

  18. United States-European Commission Urban Freight Twinning Initiative: Compendium of Project Summaries

    DOT National Transportation Integrated Search

    2017-09-01

    This compendium is comprised of 33 brief summaries of urban freight initiatives that include research projects, plans, pilot demonstrations, and other efforts. These initiatives were presented at a roundtable discussion that was part of the 2017 Annu...

  19. An Evaluation of the Nutrition Education and Training Program: Project Summary.

    ERIC Educational Resources Information Center

    St. Pierre, Robert G.

    This project summary reviews and extends the findings of prior reports made by Abt Associates, Inc. (Cambridge, Massachusetts) on the Nutrition Education and Training (NET) program, synthesizes evaluation efforts in nutrition education, and presents a set of conclusions based on the evaluations of nutrition programs. Chapter 1 presents background…

  20. Rural Textile Workers Literacy Enhancement Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    This document consists of the final report and sample curricula from the Rural Textile Workers Literacy Enhancement Project. The final report details how the project was initiated in April 1993 to help employees of five textile and apparel manufacturing companies in southeastern Alabama improve their literacy and numeracy skills. A second…

  1. Multihandicapped Blind. Final Project Report.

    ERIC Educational Resources Information Center

    Jones, Lloyd

    The final report of the Garden Grove unified school district project for 1969 through 1972 (funded through Title III) involving six multiply handicapped, legally blind children, 7- to 10-years-old, who were previously excluded from special education (SE) classes is presented. Described as the main procedural objective is development of a…

  2. Flat-plate solar array project. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Callaghan, W.; Mcdonald, R.

    1986-01-01

    In 1975, the U.S. Government contracted the Jet Propulsion Lab. to develop, by 1985, in conjunction with industry, the photovoltaics (PV) module and array technology required for widespread use of photovoltaics as a significant terrestrial energy source. As a result, a project that eventually became known as the Flat Plate Solar Array (FSA) Project was formed to manage an industry, university, and Government team to perform the necessary research and development. The original goals were to achieve widespread commercial use of PV modules and arrays through the development of technology that would allow them to be profitably sold for $1.07/peak watts (1985 dollars). A 10% module conversion efficiency and a 20 year lifetime were also goals. It is intended that the executive summary provide the means by which one can gain a perspective on 11 years of terrestrial photovoltaic research and development conducted by the FSA Project.

  3. Interagency Planning and Support Project. Final Report.

    ERIC Educational Resources Information Center

    Salisbury, Christine

    This final report describes the activities and outcomes of a federally funded project designed to develop, implement, and evaluate a systemically oriented process model for improving the coordination of education and human services for young children with identified disabilities and their families at the local level. The project developed and used…

  4. Summary Report of the Demonstration and Evaluation for the City/University EPSDT Day Care Project.

    ERIC Educational Resources Information Center

    Hierta, Ebba L., Ed.; Axelrod, Pearl G., Ed.

    This summary report from a 3-year research and demonstration project describes the framework, methods and materials used by the University of Michigan-Ann Arbor Early Periodic Screening Diagnosis and Treatment (EPSDT) Day Care Project. The project served approximately 750 children and their families through day care centers and family day care…

  5. Distance Education Technology Study. Final Report: Executive Summary presented to: Wisconsin Educational Communications Board.

    ERIC Educational Resources Information Center

    Evans Associates, Thiensville, WI.

    This document consists of the final report and executive summary of a distance education technology study conducted on behalf of the Wisconsin Educational Communications Board (WECB) during 1992-93 in order to provide information to assist the educational institutions of the state in formulating strategic directions for the development of distance…

  6. Improving critical care discharge summaries: a collaborative quality improvement project using PDSA

    PubMed Central

    Goulding, Lucy; Parke, Hannah; Maharaj, Ritesh; Loveridge, Robert; McLoone, Anne; Hadfield, Sophie; Helme, Eloise; Hopkins, Philip; Sandall, Jane

    2015-01-01

    Around 110,000 people spend time in critical care units in England and Wales each year. The transition of care from the intensive care unit to the general ward exposes patients to potential harms from changes in healthcare providers and environment. Nurses working on general wards report anxiety and uncertainty when receiving patients from critical care. An innovative form of enhanced capability critical care outreach called ‘iMobile’ is being provided at King's College Hospital (KCH). Part of the remit of iMobile is to review patients who have been transferred from critical care to general wards. The iMobile team wished to improve the quality of critical care discharge summaries. A collaborative evidence-based quality improvement project was therefore undertaken by the iMobile team at KCH in conjunction with researchers from King's Improvement Science (KIS). Plan, Do, Study, Act (PDSA) methodology was used. Three PDSA cycles were undertaken. Methods adopted comprised: a scoping literature review to identify relevant guidelines and research evidence to inform all aspects of the quality improvement project; a process mapping exercise; informal focus groups / interviews with staff; patient story-telling work with people who had experienced critical care and subsequent discharge to a general ward; and regular audits of the quality of both medical and nursing critical care discharge summaries. The following behaviour change interventions were adopted, taking into account evidence of effectiveness from published systematic reviews and considering the local context: regular audit and feedback of the quality of discharge summaries, feedback of patient experience, and championing and education delivered by local opinion leaders. The audit results were mixed across the trajectory of the project, demonstrating the difficulty of sustaining positive change. This was particularly important as critical care bed occupancy and through-put fluctuates which then impacts on work

  7. KSC History Project

    NASA Technical Reports Server (NTRS)

    Snaples, Lee

    2001-01-01

    The project is a joint endeavor between Dr. Henry Dethloff and myself and is producing a number of products related to KSC history. This report is a summary of those projects. First, there is an overview monograph covering KSC history. Second, there is a chapter outline for an eventual book-length history. Third, there is monograph on safety at KSC. Finally, there is a web page and database dedicated to the KSC oral history project.

  8. Assessment of Program Impact Through First Grade, Volume VI: Summary of Impact on Institutions, Teachers and Classrooms, Parents and Children. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Powell, Marjorie; And Others

    The final volume in a series of six evaluation reports, this document provides a summary of the results of the evaluation of Project Developmental Continuity (PDC), conducted when the evaluation study's cohort of children had completed grade 1. Begun at 15 sites in 1974 with the purpose of ensuring that disadvantaged children receive continuous…

  9. Teaching Teachers for the Future (TTF) Project TPACK Survey: Summary of the Key Findings

    ERIC Educational Resources Information Center

    Finger, Glenn; Jamieson-Proctor, Romina; Cavanagh, Rob; Albion, Peter; Grimbeek, Peter; Bond, Trevor; Fitzgerald, Robert; Romeo, Geoff; Lloyd, Margaret

    2013-01-01

    This paper presents a summary of the key findings of the TTF TPACK Survey developed and administered for the Teaching the Teachers for the Future (TTF) Project implemented in 2011. The TTF Project, funded by an Australian Government ICT Innovation Fund grant, involved all 39 Australian Higher Education Institutions which provide initial teacher…

  10. Connected Vehicle Pilot Deployment Program phase 1 : deployment readiness summary : New York City : final report.

    DOT National Transportation Integrated Search

    2016-09-09

    This document describes the Deployment Readiness Summary for the New York City (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. It demonstrates the completion of Task 1-12 deliverables of Phase 1 by the NYC team. The document also addresses h...

  11. Georgia Deaf-Blind Pilot Project: Project EPIC. Final Report. Optional Pilot Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of Project EPIC (Effective Partner Interaction in the Community), a 3-year federally supported project in Georgia to facilitate the establishment and implementation of effective educational practices with students having deaf-blindness. The project was designed to expand students' present…

  12. Final Technical Report- Virginia Solar Pathways Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bond, Katharine; Cosby, Sarah

    This Report provides a technical review of the final results of a funding award to Virginia Electric and Power Company (Dominion Energy Virginia (DEV) or the Company) for a project under the U.S. Department of Energy’s Solar Energy Technologies Office. The three-year project was formally known as the Virginia Solar Pathways Project (VSPP or the Project). The purpose of the VSPP was to develop a collaborative utility-administered solar strategy (Solar Strategy) for DEV’s service territory in the Commonwealth that could serve as a replicable model for other states with similar policy environments.

  13. Minnesota Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Kloos, Eric

    This final report describes activities and accomplishments of the 3-year federally supported Minnesota Deaf-Blind Technical Assistance Project. The project provided training and technical assistance, information sharing, and support services to families of children with deaf-blindness. Activities and accomplishments included: collaboration with…

  14. Advanced Air Transportation Technologies Project, Final Document Collection

    NASA Technical Reports Server (NTRS)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  15. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial actionmore » contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  16. Project summary

    NASA Technical Reports Server (NTRS)

    1991-01-01

    California Polytechnic State University's design project for the 1990-91 school year was the design of a close air support aircraft. There were eight design groups that participated and were given requests for proposals. These proposals contained mission specifications, particular performance and payload requirements, as well as the main design drivers. The mission specifications called for a single pilot weighing 225 lb with equipment. The design mission profile consisted of the following: (1) warm-up, taxi, take off, and accelerate to cruise speed; (2) dash at sea level at 500 knots to a point 250 nmi from take off; (3) combat phase, requiring two combat passes at 450 knots that each consist of a 360 deg turn and an energy increase of 4000 ft. - at each pass, half of air-to-surface ordnance is released; (4) dash at sea level at 500 knots 250 nmi back to base; and (5) land with 20 min of reserve fuel. The request for proposal also specified the following performance requirements with 50 percent internal fuel and standard stores: (1) the aircraft must be able to accelerate from Mach 0.3 to 0.5 at sea level in less than 20 sec; (2) required turn rates are 4.5 sustained g at 450 knots at sea level; (3) the aircraft must have a reattack time of 25 sec or less (reattack time was defined as the time between the first and second weapon drops); (4) the aircraft is allowed a maximum take off and landing ground roll of 2000 ft. The payload requirements were 20 Mk 82 general-purpose free-fall bombs and racks; 1 GAU-8A 30-mm cannon with 1350 rounds; and 2 AIM-9L Sidewinder missiles and racks. The main design drivers expressed in the request for proposal were that the aircraft should be survivable and maintainable. It must be able to operate in remote areas with little or no maintenance. Simplicity was considered the most important factor in achieving the former goal. In addition, the aircraft must be low cost both in acquisition and operation. The summaries of the aircraft

  17. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume I: Summary Volume.

    ERIC Educational Resources Information Center

    Stenner, A. Jackson; And Others

    This document contains the first of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  18. Final-Year Projects as a Major Element in the IE Curriculum

    ERIC Educational Resources Information Center

    Vitner, G.; Rozenes, S.

    2009-01-01

    This paper presents a multi-perspective view of the final-year project of an industrial engineering and management (IEM) department. The final year project is a major element of a 4-year curriculum within any engineering discipline. Such a project gives the student an opportunity to use and implement methods, techniques and tools that he or she…

  19. Increasing Prediction the Original Final Year Project of Student Using Genetic Algorithm

    NASA Astrophysics Data System (ADS)

    Saragih, Rijois Iboy Erwin; Turnip, Mardi; Sitanggang, Delima; Aritonang, Mendarissan; Harianja, Eva

    2018-04-01

    Final year project is very important forgraduation study of a student. Unfortunately, many students are not seriouslydidtheir final projects. Many of studentsask for someone to do it for them. In this paper, an application of genetic algorithms to predict the original final year project of a studentis proposed. In the simulation, the data of the final project for the last 5 years is collected. The genetic algorithm has several operators namely population, selection, crossover, and mutation. The result suggest that genetic algorithm can do better prediction than other comparable model. Experimental results of predicting showed that 70% was more accurate than the previous researched.

  20. The Employment Retention and Advancement Project: How Effective Are Different Approaches Aiming to Increase Employment Retention and Advancement? Final Impacts for Twelve Models. Executive Summary

    ERIC Educational Resources Information Center

    Hendra, Richard; Dillman, Keri-Nicole; Hamilton, Gayle; Lundquist, Erika; Martinson, Karin; Wavelet, Melissa

    2010-01-01

    This report summarizes the final impact results for the national Employment Retention and Advancement (ERA) project. This project tested, using a random assignment design, the effectiveness of numerous programs intended to promote steady work and career advancement. All the programs targeted current and former welfare recipients and other low-wage…

  1. Telemedicine. Final report/project accomplishments summary CRADA number 95-KCP-1014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    VanDeusen, A.L.

    1997-04-01

    This project was initiated to fill existing voids in the telemedicine equipment market. Currently, when a medical facility adds telemedicine capability to their video conference system, they must purchase expensive and bulky encoders and decoders in order to send information over the available data channel. Even with this expensive equipment, only one data type (stethoscope or ECG) can be sent at a time. In addition, since existing encoders and decoders are not designed specifically for telemedicine, special cables must be built to connect with this equipment. This project resulted in the design and construction of an encoder/decoder system that resolvedmore » these issues. The unit (referred to as the Telecoder) is designed specifically for the telemedicine market. The Telecoder is compact, handles two types of data (stethoscope and ECG) simultaneously, integrates with existing medical equipment, and is less expensive. In addition to the Telecoder module, a prototype was built that adds all the necessary logic and interfaces necessary to integrate the basic encoder design into additional Cardionics products. Although a complete integration into other Cardionics products was not in the scope of this CRADA, all the basic design work has been done to allow Cardionics to complete the work.« less

  2. Hiilangaay Hydroelectric ProjectFinal Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Twitchell, Sara; Stimac, Michael; Lang, Lisa

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less

  3. MEASUREMENT ERROR ESTIMATION AND CORRECTION METHODS TO MINIMIZE EXPOSURE MISCLASSIFICATION IN EPIDEMIOLOGICAL STUDIES: PROJECT SUMMARY

    EPA Science Inventory

    This project summary highlights recent findings from research undertaken to develop improved methods to assess potential human health risks related to drinking water disinfection byproduct (DBP) exposures.

  4. THe Case Method of Instruction (CMI) Project. Final Report.

    ERIC Educational Resources Information Center

    McWilliam, P. J.; And Others

    This final report describes the Case Method of Instruction (CMI) Project, a project to develop, field test, and disseminate training materials to facilitate the use of the Case Method of Instruction by inservice and preservice instructors in developmental disabilities. CMI project activities focused on developing a collection of case stories and…

  5. Application of Computational Toxicological Approaches in Supporting Human Health Risk Assessment, Project Summary

    EPA Science Inventory

    Summary

    This project has three parts. The first part focuses on developing a tiered strategy and applying computational toxicological approaches to support human health risk assessment by deriving a surrogate point-of-departure (e.g., NOAEL, LOAEL, etc.) using a test c...

  6. Job Skills Education Program. Final Technical Report.

    ERIC Educational Resources Information Center

    Florida State Univ., Tallahassee. Center for Educational Technology.

    This publication provides materials developed by a project designed to transfer a U.S. Army computer-based basic skills curriculum to applications in the vocational skills development of civilian adults. An executive summary of the final report describes the Job Skills Education Program (JSEP), which teaches academic skills that support vocational…

  7. LYNX community advocacy & service engagement (CASE) project final report.

    DOT National Transportation Integrated Search

    2009-05-14

    This report is a final assessment of the Community Advocacy & Service Engagement (CASE) project, a LYNX-FTA research project designed : to study transit education and public engagement methods in Central Florida. In the Orlando area, as in other part...

  8. Implementation of Polyurea Applications for Wastewater System Corrosion-Mitigation Projects: Final Report on Project F15-AR04

    DTIC Science & Technology

    2017-07-24

    Corrosion-Mitigation Projects Final Report on Project F15-AR04 Co ns tr uc tio n En gi ne er in g R es ea rc h La bo ra to ry Clint A. Wilson...2017 Implementation of Polyurea Applications for Wastewater System Corrosion-Mitigation Projects Final Report on Project F15-AR04 Clint A...Secretary of Defense Washington, DC 20301-3090 Under Project F15-AR04, “Polyurea Coating for Rehabilitation of Concrete and Metal Infrastructure

  9. 78 FR 65756 - Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... review of the FTA actions announced herein for the listed public transportation project will be barred... taken final agency actions by issuing certain approvals for the public transportation project listed...

  10. 78 FR 45287 - Limitation on Claims against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... FTA action announced herein for the listed public transportation project will be barred unless the... final agency action by issuing a certain approval for the public transportation project listed below...

  11. 76 FR 2949 - Notice of Final Federal Agency Actions on Proposed Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... of limitation on claims for judicial review of actions by FHWA. SUMMARY: This notice announces... a proposed project, the SR 520 Pontoon Construction Project in the State of Washington. Those... agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency...

  12. Admiralty Inlet Pilot Tidal Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around themore » world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.« less

  13. A Social Studies Curriculum for a Modern World. The Marin Social Studies Project. Final Report.

    ERIC Educational Resources Information Center

    Lester, G. Sidney; And Others

    The major portion of this report provides a narrative summary and description of the work of the project, its context, evaluation, and recommendations. The major objectives of this three-year project were to: 1) field test and evaluate new K-12 social studies curriculum project materials, and 2) design a new K-12 social studies framework based on…

  14. Almost certain escape from black holes in final state projection models.

    PubMed

    Lloyd, Seth

    2006-02-17

    Recent models of the black-hole final state suggest that quantum information can escape from a black hole by a process akin to teleportation. These models rely on a controversial process called final-state projection. This Letter discusses the self-consistency of the final-state projection hypothesis and investigates escape from black holes for arbitrary final states and for generic interactions between matter and Hawking radiation. Quantum information escapes with fidelity approximately = (8/3pi)2: only half a bit of quantum information is lost on average, independent of the number of bits that escape from the hole.

  15. Arizona Deafblind Project, 1995-1999. Final Report.

    ERIC Educational Resources Information Center

    Arizona State School for the Deaf and Blind, Tucson.

    This final report describes accomplishments of the four-year federally funded Arizona Deafblind Project which attempted to: (1) identify all deafblind children in Arizona; (2) deliver technical assistance to families; (3) deliver technical assistance to service providers; and (4) enhance community oversight, coordination, and collaboration with…

  16. Evaluation of Nuclear Facility Decommissioning Projects program: a reference test reactor. Project summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boing, L.E.; Miller, R.L.

    1983-10-01

    This document presents, in summary form, generic conceptual information relevant to the decommissioning of a reference test reactor (RTR). All of the data presented were extracted from NUREG/CR-1756 and arranged in a form that will provide a basis for future comparison studies for the Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program. During the data extraction process no attempt was made to challenge any of the assumptions used in the original studies nor was any attempt made to update assumed methods or processes to state-of-the-art decommissioning techniques. In a few instances obvious errors were corrected after consultation with the studymore » author.« less

  17. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, Stephanie Lee

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  18. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, S. L.

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  19. Nabisco Foods Division--"New Indy" Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Ivy Tech State Coll., Indianapolis, IN.

    This document contains a final report, evaluation, and curriculum materials from a project conducted at the RJR Nabisco plant in Indianapolis to upgrade the literacy and numeracy skills of the workers to facilitate technological changes to production lines. As the final report explains, although the goal of the project was to recruit and test 150…

  20. Special Education Evaluation Project for University Affiliated Facilities. Final Report.

    ERIC Educational Resources Information Center

    Burrello, Leonard C.; And Others

    The final report of the Special Education Evaluation Project for 16 University Affiliated Facilities (UAF) centers provides a chronological review of the project which focused on the training of persons to work with mentally retarded or other handicapped individuals. Outlined are project objectives including the development of descriptors useful…

  1. The Dust Management Project: Final Report

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  2. Evaluation of the Rural Math Excel Partnership Project Final Report

    ERIC Educational Resources Information Center

    Nagle, Katherine; Pratt-Williams, Jaunelle; Schmidt, Rebecca; Swantek, Cara; Lyulchenko, Marianna; McGhee, Raymond

    2016-01-01

    This is the final external evaluation report prepared by SRI International for the Rural Math Excel Partnership (RMEP) project, an investing in innovation (i3) development project funded by the U.S. Department of Education. Operated by Virginia Advanced Study Strategies, Inc. (VASS), the RMEP project included six rural school districts (LEAs) in…

  3. Science and Engineering Technician Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Mowery, Donald R.; Wolf, Lawrence J.

    Project SET (Science and Engineering for Technicians) developed a series of study guides designed to teach generic science and engineering skills to students interested in becoming technicians. An entire 2-year curriculum is encompassed by these guides, geared for 2-year college students. Described in this final report are the project's rationale,…

  4. HUMAN DEVELOPMENT PROJECT, 1965-1966. FINAL REPORT.

    ERIC Educational Resources Information Center

    Richmond Public Schools, VA.

    THIS FINAL REPORT IS AN EVALUATION OF A COMPENSATORY EDUCATION PROJECT IN RICHMOND, VIRGINIA. DATA ARE DERIVED FROM TEACHERS' RESPONSES TO A QUESTIONNAIRE, FROM A REPORT ON THE ACADEMIC PERFORMANCE OF PUPILS IN THE 1965 SUMMER PROGRAM, AND FROM AN ANALYSIS OF STANDARDIZED ACHIEVEMENT TEST RESULTS IN EXPERIMENTAL AND CONTROL SCHOOLS. THE REPORT…

  5. Desert Peak East Enhanced Geothermal Systems (EGS) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zemach, Ezra; Drakos, Peter; Spielman, Paul

    2013-09-30

    This manuscript is a draft to replaced with a final version at a later date TBD. A summary of activities pertaining to the Desert Peak EGS project including the planning and resulting stimulation activities.

  6. 29 CFR 18.41 - Summary decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Summary decision. 18.41 Section 18.41 Labor Office of the... ADMINISTRATIVE LAW JUDGES General § 18.41 Summary decision. (a) No genuine issue of material fact. (1) Where no.... Any final decision issued as a summary decision shall conform to the requirements for all final...

  7. Annual DOE active solar heating and cooling contractors' review meeting. Premeeting proceedings and project summaries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None,

    1981-09-01

    Ninety-three project summaries are presented which discuss the following aspects of active solar heating and cooling: Rankine solar cooling systems; absorption solar cooling systems; desiccant solar cooling systems; solar heat pump systems; solar hot water systems; special projects (such as the National Solar Data Network, hybrid solar thermal/photovoltaic applications, and heat transfer and water migration in soils); administrative/management support; and solar collector, storage, controls, analysis, and materials technology. (LEW)

  8. Project Summary and Conclusions

    NASA Technical Reports Server (NTRS)

    Sawin, Charles

    1999-01-01

    A top level summary of activities conducted throughout the course of the EDOMP in response to initial concerns at the outset of the program is provided. Significant findings from the investigations are summarized, together with resulting countermeasures that were implemented and flight rules that were developed in response to these findings. Subsequent paragraphs provide more information; details will be found in the referenced sections.

  9. Final Report: Summary of Findings and Recommendations for Suction Devices for Management of Prehospital Combat Casualty Care Injuries

    DTIC Science & Technology

    2017-11-13

    information and proposes a series of findings and recommendations to improved airway management in the prehospital combat environment. The key...Airway Final Report: Summary of Findings and Recommendations for Suction Devices for Management of Prehospital Combat Casualty Care Injuries...75 General Information and Device Usability

  10. High-speed microprocessor characterization. Final report/project accomplishments summary, CRADA Number KCP-94-1004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, L.W.

    The objective of the project was to characterize and document the critical operating parameters of an 0.8-micron, 350-MHz, 32-bit microprocessor prototype. The roles of FM and T and the participant company were: FM and T -- evaluation performance of the prototype 32-bit microprocessor using the IDS5000 and Tektronix S3260 Integrated Circuit Test System; Corda -- design and build the prototype microprocessor. This project was terminated with nearly all of the planned activities unaddressed.

  11. 77 FR 76477 - Notice of Availability of the Final Environmental Impact Statement for the Quartzsite Solar...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... traditional steam turbine generators. The Project would contain the central receiver or tower, a solar field... the Final Environmental Impact Statement for the Quartzsite Solar Energy Project and the Yuma Field...: Notice of Availability. SUMMARY: Quartzsite Solar Energy (QSE) has requested to interconnect the...

  12. Household Hazardous Waste Disposal Project. Summary Report. Metro Toxicant Program Report No. 1A.

    ERIC Educational Resources Information Center

    Ridgley, Susan M.; Galvin, David V.

    The Household Hazardous Waste Disposal Project was established as an interagency effort to reduce the level of toxicants entering the environment by developing a control plan for the safe disposal of small quantities of household chemicals. This summary report provides an overview of the aspects of this problem that were examined, and the steps…

  13. Project Developmental Continuity Evaluation: Final Report. Appendices to Volume I.

    ERIC Educational Resources Information Center

    Bond, James T.; And Others

    This document provides the appendices for volume 1 of the final evaluation report of Project Developmental Continuity (PDC), a Head Start demonstration project initiated in 1974 to develop program models which enhance children's social competence by fostering developmental continuity from preschool through the early elementary grades.…

  14. Project LEEDS: Leadership Education To Empower Disabled Students. Final Report.

    ERIC Educational Resources Information Center

    Aune, Betty; And Others

    This final report describes the activities of Project LEEDS (Leadership Education to Empower Disabled Students), a federally supported project designed to create student/staff teams from colleges and universities to encourage undergraduate/graduate students with disabilities to become leaders, through development of self-identity and identity with…

  15. Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS): Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    de Boer, Gijs; Lawrence, Dale; Palo, Scott

    2017-03-29

    This final technical report details activities undertaken as part of the referenced project. Included is information on the preparation of aircraft for deployment to Alaska, summaries of the three deployments covered under this project, and a brief description of the dataset and science directions pursued. Additionally, we provide information on lessons learned, publications, and presentations resulting from this work.

  16. Argonne National Laboratory summary site environmental report for calendar year 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Golchert, N. W.

    2009-05-22

    the outline, partners divided work equally and began to carefully summarize. Groups summaries were edited, not only within groups, but also by other groups, in order to acquire a different perspective. Finally, Mr. Howard, our Biology II instructor, took a final look at the products before sending them off for the final review by Argonne. The final project was a 16-page pamphlet. The students reacted positively to the project. Asked if she was glad that she chose to work on the Argonne project, Katie Hanson said, 'Yes. I have enjoyed having the opportunity to become a published author. Also, it is an honor to be able to work with a prestigious, nationally recognized laboratory such as Argonne'. There were difficult aspects as well. Student Olga Zagariya said the hardest part of the project was 'trying to choose which information to put in the summary and which information to leave out, because it all seemed to be important'. It seems that everyone was satisfied with his or her section.« less

  17. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Director of the Office of Energy Projects. The cost limits for calendar year 2013, as published in Table I.... ACTION: Final rule. SUMMARY: Pursuant to the authority delegated by 18 CFR 375.308(x)(1), the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for...

  18. Services for Children with Deaf-Blindness Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Stremel, Kathleen

    This final report describes a pilot project, "Quality Service Provision for Infants and Young Children with Deaf-Blindness: A Mechanism for State Intervention Teams," developed and implemented at the University of Southern Mississippi. The project developed a model of an intervention team that provides intensive training and technical…

  19. Selection and Validation of Model Early Childhood Projects: Final Report.

    ERIC Educational Resources Information Center

    Stock, John R.; And Others

    Presented is the final report of a research program to select and describe outstanding Handicapped Children's Early Education Program (HCEEP) projects. Projects were analyzed in terms of 14 components of an HCEEP program (such as screening, programing, and inservice training). A detailed discussion of model selection and validation is appendixed.)…

  20. Autism in Virginia: A Statewide Study. Summary. [and] A Study of Statewide Services for Persons with Autism in Virginia. Final Report.

    ERIC Educational Resources Information Center

    Bauserman, Deborah; And Others

    The two documents combined here both pertain to the same 18 month study of autism in the state of Virginia. "Autism in Virginia" is a six page summary of the 250 page final report; it is intended for parents and professionals needing to get at the highlights of the larger document. The final report presents detailed findings from a study…

  1. Using Insider Research in MEd Final Projects to Bridge the Theory/Practice Gap

    ERIC Educational Resources Information Center

    Arar, Khalid

    2018-01-01

    This paper aims to identify key issues involved in MEd final project supervision and to highlight the potential of supervision from an academic institution to change educational reality through the postgraduate student-teachers' work-based final project as insider researchers in Israeli schools. It draws on analysis of case-study data from two…

  2. 76 FR 38134 - Final Priorities; Disability and Rehabilitation Research Projects and Centers Program-Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ...-identified research designs to generate reliable and valid findings. Changes: None. Final Priorities Priority... DEPARTMENT OF EDUCATION Final Priorities; Disability and Rehabilitation Research Projects and Centers Program--Disability Rehabilitation Research Projects, etc. AGENCY: Office of Special Education and...

  3. 77 FR 55232 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...

  4. 77 FR 55231 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...

  5. National Land Imaging Requirements (NLIR) Pilot Project summary report: summary of moderate resolution imaging user requirements

    USGS Publications Warehouse

    Vadnais, Carolyn; Stensaas, Gregory

    2014-01-01

    Under the National Land Imaging Requirements (NLIR) Project, the U.S. Geological Survey (USGS) is developing a functional capability to obtain, characterize, manage, maintain and prioritize all Earth observing (EO) land remote sensing user requirements. The goal is a better understanding of community needs that can be supported with land remote sensing resources, and a means to match needs with appropriate solutions in an effective and efficient way. The NLIR Project is composed of two components. The first component is focused on the development of the Earth Observation Requirements Evaluation System (EORES) to capture, store and analyze user requirements, whereas, the second component is the mechanism and processes to elicit and document the user requirements that will populate the EORES. To develop the second component, the requirements elicitation methodology was exercised and refined through a pilot project conducted from June to September 2013. The pilot project focused specifically on applications and user requirements for moderate resolution imagery (5–120 meter resolution) as the test case for requirements development. The purpose of this summary report is to provide a high-level overview of the requirements elicitation process that was exercised through the pilot project and an early analysis of the moderate resolution imaging user requirements acquired to date to support ongoing USGS sustainable land imaging study needs. The pilot project engaged a limited set of Federal Government users from the operational and research communities and therefore the information captured represents only a subset of all land imaging user requirements. However, based on a comparison of results, trends, and analysis, the pilot captured a strong baseline of typical applications areas and user needs for moderate resolution imagery. Because these results are preliminary and represent only a sample of users and application areas, the information from this report should only

  6. Project summaries

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Lunar base projects, including a reconfigurable lunar cargo launcher, a thermal and micrometeorite protection system, a versatile lifting machine with robotic capabilities, a cargo transport system, the design of a road construction system for a lunar base, and the design of a device for removing lunar dust from material surfaces, are discussed. The emphasis on the Gulf of Mexico project was on the development of a computer simulation model for predicting vessel station keeping requirements. An existing code, used in predicting station keeping requirements for oil drilling platforms operating in North Shore (Alaska) waters was used as a basis for the computer simulation. Modifications were made to the existing code. The input into the model consists of satellite altimeter readings and water velocity readings from buoys stationed in the Gulf of Mexico. The satellite data consists of altimeter readings (wave height) taken during the spring of 1989. The simulation model predicts water velocity and direction, and wind velocity.

  7. Georgia Deaf-Blind Project. Final Report, 1992-1995. State and Multi-State Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of the Georgia Deaf-Blind Project, a 3-year federally supported project encompassing 159 counties and providing technical assistance to 237 infants, children, and youth with deaf-blindness along with their families and their service providers. Project accomplishments included: (1) more…

  8. Final-Year Education Projects for Undergraduate Chemistry Students

    ERIC Educational Resources Information Center

    Page, Elizabeth

    2011-01-01

    The Undergraduate Ambassadors Scheme provides an opportunity for students in their final year of the chemistry degree course at the University of Reading to choose an educational project as an alternative to practical research. The undergraduates work in schools where they can be regarded as role models and offer one way of inspiring pupils to…

  9. Analysis of Florida Department of Transportation transit corridor program/projects : technical memorandum number one - review and summary of transit corridor plans

    DOT National Transportation Integrated Search

    2001-05-01

    The purpose of this project was to undertake a consolidated comprehensive review of the Florida Department of Transportation Transit Corridor Program. Technical Memorandum Number One provides a summary of all transit corridor projects either under wa...

  10. Final Technical Report for contract number DE-FG02-05ER15670

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glazebrook, Jane

    This is the final technical report for contract number DE-FG02-05ER15670. The project is now complete, and results of the project have been published. Two papers were published based on work done in the last three-year funding period. The DOIs of these papers are included below. The abstracts of the papers, providing summaries of the work, are included in the body of the report.

  11. The Early Childhood Interactive Technology Literacy Curriculum Project: A Final Report.

    ERIC Educational Resources Information Center

    Hutinger, Patricia; Robinsosn, Linda; Schneider, Carol; Johanson, Joyce

    This final report describes the activities and outcomes of the Interactive Technology Literacy Curriculum (ITLC) project. This federally funded 5-year model demonstration project was designed to advance the availability, quality, use and effectiveness of computer technology in addressing the acquisition of emergent literacy among young children…

  12. Quality Inservice Education: Final Report of the National Inservice Network, 1978-1981.

    ERIC Educational Resources Information Center

    Burrello, Leonard C.; And Others

    The document comprises the final report of the National Inservice Network (NIN), a program to describe and distribute regular education inservice (REGI) project abstracts, products, and lessons aimed at more effectively working with handicapped students. Initial sections contain an executive summary and an overview explaining the NIN as a…

  13. Regional Aquifer-System Analysis Program of the U.S. Geological Survey: Summary of projects, 1978-84

    USGS Publications Warehouse

    Sun, Ren Jen

    1986-01-01

    The Regional Aquifer-System Analysis Program of the U.S. Geological Survey was initiated in 1978 as a result of specifications of the appropriations bill of the 95th Congress, prompted by the 1977 drought. The purpose of this program is to define the regional hydrology and geology and to establish a framework of background information of geology, hydrology, and geochemistry of the Nation's important aquifer systems. This information is critically needed to develop an understanding of ground-water flow systems, and to support better ground-water resources management.As of 1984, investigations of seven regional aquifer systems were completed, nine regional aquifer systems were still being studied, and three new studies were started. This report summarizes the status of each investigation of the regional aquifer systems under the program from 1978 through 1984. The nature of the summaries differs somewhat from study to study. For those studies which either have been completed or are near completion, summaries of results are presented. For projects that are not near completion or have just been started, discussions may be brief and focus on problem issues or hydrogeologic conditions All reports resulting from the study as of 1984 are listed at the end of each summary. A list of project chiefs and their offices is also included in the report for those who are interested in obtaining additional information.

  14. Summary of engineering-scale experiments for the Solar Detoxification of Water project

    NASA Astrophysics Data System (ADS)

    Pacheco, J. E.; Yellowhorse, L.

    1992-03-01

    This report contains a summary of large-scale experiments conducted at Sandia National Laboratories under the Solar Detoxification of Water project. The objectives of the work performed were to determine the potential of using solar radiation to destroy organic contaminants in water by photocatalysis and to develop the process and improve its performance. For these experiments, we used parabolic troughs to focus sunlight onto glass pipes mounted at the trough's focus. Water spiked with a contaminant and containing suspended titanium dioxide catalyst was pumped through the illuminated glass pipe, activating the catalyst with the ultraviolet portion of the solar spectrum. The activated catalyst creates oxidizers that attack and destroy the organics. Included in this report are a summary and discussion of the implications of experiments conducted to determine: the effect of process kinetics on the destruction of chlorinated solvents (such as trichloroethylene, perchloroethylene, trichloroethane, methylene chloride, chloroform and carbon tetrachloride), the enhancement due to added hydrogen peroxide, the optimal catalyst loading, the effect of light intensity, the inhibition due to bicarbonates, and catalyst issues.

  15. Air treatment project: Final summary report and bibliography. Technical memorandum, 1 October 1993--30 September 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, J.M.

    This summary report describes the results of more than two years of research conducted with funding provided by SERDP, the Marine Corps Logistic Bases (MCLB) and the Navy Department`s LINC (Repair Technology) Program. The research focused on the destruction of VOCs in paint booth exhaust using hybrid air pollution control technologies. The hybrid system selected included three principle modules: UV photochemical destruction; counter-flow packed bed scrubbing using activated oxygen; and granular activation of carbon adsorption with subsequent oxidative regeneration of the carbon. The stated goals of the research included enhanced understanding of this set of technologies to support design ofmore » smaller, more affordable treatment system for both DoD and commercial application.« less

  16. 77 FR 11585 - Notice of Availability of the Aspinall Unit Operations Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Operations Final Environmental Impact Statement, Wayne N. Aspinall Unit, Colorado River Storage Project... SUMMARY: The Bureau of Reclamation (Reclamation), the Federal agency responsible for operation of the... Aspinall Unit operations, Gunnison and Montrose Counties, Colorado. DATES: Reclamation will not make a...

  17. The LiveWire Project final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, C.D.; Nelson, T.T.; Kelly, J.C.

    Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local areamore » network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.« less

  18. Standards Improvement Project-Phase II. Final rule.

    PubMed

    2005-01-05

    The Occupational Safety and Health Administration (OSHA) through this final rule is continuing to remove and revise provisions of its standards that are outdated, duplicative, unnecessary, or inconsistent, or can be clarified or simplified by being written in plain language. The Agency completed Phase I of the Standards Improvement Project in June 1998. In this Phase II of the Standards Improvement Project, OSHA is again revising or removing a number of health provisions in its standards for general industry, shipyard employment, and construction. The Agency believes that the changes streamline and make more consistent the regulatory requirements in OSHA health and safety standards. In some cases, OSHA has made substantive revisions to requirements because they are outdated, duplicative, unnecessary, or inconsistent with more recently promulgated health standards. The Agency believes these revisions will reduce regulatory requirements for employers without reducing employee protection.

  19. Project Summary Report

    NASA Technical Reports Server (NTRS)

    Upchurch, Christopher

    2011-01-01

    The project, being the development of resource management applications, consisted entirely of my own effort. From deliverable requirements provided by my mentor, and some functional requirement additions generated through design reviews, It was my responsibility to implement the requested features as well as possible, given the resources available. For the most part development work consisted of database programming and functional testing using real resource data. Additional projects I worked on included some firing room console training, configuring the new NE-A microcontroller development lab network, mentoring high school CubeSat students, and managing the NE interns' component of the mentor appreciation ceremony.

  20. 75 FR 19168 - Federal Acquisition Regulation; FAR Case 2009-005, Use of Project Labor Agreements for Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... located on Indian reservations. Response: GSA, DoD, and NASA have clarified in the final rule that project... Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Final rule. SUMMARY: GSA, DOD, and NASA are issuing a final rule amending the Federal Acquisition Regulation (FAR) to implement...

  1. Laboratory Directed Research and Development Program FY2016 Annual Summary of Completed Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    ORNL FY 2016 Annual Summary of Laboratory Directed Research and Development Program (LDRD) Completed Projects. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of DOE Order 413.2C, “Laboratory Directed Research and Development” (October 22, 2015), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all Laboratory programs. ORNL reports its status to DOE in March of each year.

  2. Communication Platform Payload Definition (CPPD) study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Hunter, E. M.

    1986-01-01

    This is Volume 1 (Executive Summary) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.

  3. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lear, Jon; Bennett, Carlon; Lear, Dan

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator -more » Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.« less

  4. Pacific Basin Deaf-Blind Project. State & Multi State Projects for Children with Deaf-Blindness. Final Report, 1992-1995.

    ERIC Educational Resources Information Center

    Kelly, Dotty; Guerrero, Vincent Leon

    This final report describes activities and accomplishments of the Pacific Basin Deaf-Blind Project, a 3-year federally funded project to provide technical assistance to public and private agencies, institutions, and organizations providing early intervention, educational, transitional, vocational, early identification, and related services to…

  5. Project SAGE: solar assisted gas energy. Final report and executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Phase III basic objective was establishment of a technical and economic baseline for proper assessment of the practical potential of solar water heating for apartments. Plans can then be formulated to improve SAGE technical design and performance; reduce SAGE costs; refine SAGE market assessment; and identify policies to encourage the use of SAGE. Two SAGE water heating systems were installed and tested. One system was retrofit onto an existing apartment building; the other was installed in a new apartment building. Each installation required approximately 1000 square feet of collector area tilted to an angle of 37/sup 0/ from themore » horizontal, and each was designed to supply about 70 percent of the energy for heating water for approximately 32 to 40 units of a typical two-story apartment complex in Southern California. Actual contruction costs were carefully compiled, and both installations were equipped with performance monitoring equipment. In addition, the operating and maintenance requirements of each installation was evaluated by gas company maintenance engineers. Upon completion of the installation analysis, the SAGE installation cost was further refined by obtaining firm SAGE construction bids from two plumbing contractors in Southern California. Market penetration was assessed by developing a computer simulation program using the technical and economic analysis from the installation experience. Also, the project examined the public policies required to encourage SAGE and other solar energy options. Results are presented and discussed. (WHK)« less

  6. 12 CFR 1780.31 - Summary disposition.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Summary disposition. 1780.31 Section 1780.31... Summary disposition. (a) In general. The presiding officer shall recommend that the Director issue a final order granting a motion for summary disposition if the undisputed pleaded facts, admissions, affidavits...

  7. Tom Green County Library Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Vavricka, D. Karen

    The final report of the Tom Green Country Library System (Texas) literacy project details progress toward achievement of 11 objectives. Objectives of the literacy outreach program were to: (1) increase Hispanic enrollment; (2) increase Black enrollment; (3) provide free child care for 4 students to attend 50 tutoring sessions; (4) provide…

  8. Working Parents Project. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Mason, Theresa; Espinoza, Renato

    Summarized in this report is a study designed to explore the interrelationships that develop over time between two of the most important aspects of people's lives: their work and their families. Specifically, the study focuses on how the nature of women's jobs influences the system of nuclear family relationships and affects parents' involvement…

  9. Caldecott improvement project : final scoping summary report.

    DOT National Transportation Integrated Search

    2003-02-01

    The California Department of Transportation (the Department) proposes improvements needed : to reduce congestion and improve mobility at and near the Caldecott Tunnel along State Route : (SR) 24. Working with the Federal Highway Administration (FHWA)...

  10. Amendments to Summary Plan Description regulations. Pension and Welfare Benefits Administration, Labor. Final rule.

    PubMed

    2000-11-21

    This document contains a final rule amending the regulations governing the content of the Summary Plan Description (SPD) required to be furnished to employee benefit plan participants and beneficiaries under the Employee Retirement Income Security Act of 1974, as amended (ERISA). These amendments implement information disclosure recommendations of the President's Advisory Commission on Consumer Protection and Quality in the Health Care Industry, as set forth in their November 20, 1997, report, "Consumer Bill of Rights and Responsibilities." Specifically, the amendments clarify benefit, medical provider, and other information required to be disclosed in, or as part of, the SPD of a group health plan and repeal the limited exemption with respect to SPDs of welfare plans providing benefits through qualified health maintenance organizations (HMOs). In addition, this document contains several amendments updating and clarifying provisions relating to the content of SPDs that affect both pension and welfare benefit plans. This document also adopts in final form certain regulations that were effective on an interim basis implementing amendments to ERISA enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA). This final rule will affect employee pension and welfare benefit plans, including group health plans, as well as administrators, fiduciaries, participants and beneficiaries of such plans.

  11. Final report on the maintenance asset management project : phase II.

    DOT National Transportation Integrated Search

    2013-07-01

    Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some ne...

  12. Ceramic Technology Project data base: September 1992 summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keyes, B.L.P.

    Data presented in this report represent an intense effort to improve processing methods, testing methods, and general mechanical properties (rupture modulus, tensile, creep, stress-rupture, dynamic and cyclic fatigue, fracture toughness) of candidate ceramics for use in advanced heat engines. This work was performed by many facilities and represents only a small part of the data generated by the Ceramic Technology Project (CTP) since 1986. Materials discussed include GTE PY6, GN-10, NT-154, NT-164, SN-260, SN-251, SN-252, AY6, silicon nitride combined with rare-earth oxides, Y-TZP, ZTA, NC-433, NT-230, Hexoloy SA, MgO-PSZ-to-MgO-PSZ joints, MgO-PSZ-to-cast iron, and a few whisker/fiber-reinforced ceramics. Information in thismore » report was taken from the project`s semiannual and bimonthly progress reports and from final reports summarizing the results of individual studies. Test results are presented in tabular form and in graphs. All data, including test rig descriptions and material characterizations, are stored in the CTP data base and are available to all project participants on request. The objective of this report is to make available the test results from these studies but not to draw conclusions from those data.« less

  13. Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warf, Don; Livingston, Scott

    2009-04-16

    In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installationmore » of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.« less

  14. Exploring the Content of Shared Mental Models in Project Teams

    DTIC Science & Technology

    2005-09-30

    FINAL REPORT Grant Title: EXPLORING THE CONTENT OF SHARED MENTAL MODELS IN PROJECT TEAMS Office of Naval Research Award Number: N000140210535... Research Laboratory, Attn: code 5227, 4555 Overlook Ave., SW, Washington, DC •t• The University of Massachusetts Amherst is an Affirmative Action/Equal...satisfaction. 2.0 PROJECT SUMMARY No consensus among researchers studying shared cognition exists regarding the identification of what should be

  15. 12 CFR 747.29 - Summary disposition.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Summary disposition. 747.29 Section 747.29... of Practice and Procedure § 747.29 Summary disposition. (a) In general. The administrative law judge shall recommend that the NCUA Board issue a final order granting a motion for summary disposition if the...

  16. 12 CFR 19.29 - Summary disposition.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Summary disposition. 19.29 Section 19.29 Banks... Uniform Rules of Practice and Procedure § 19.29 Summary disposition. (a) In general. The administrative law judge shall recommend that the Comptroller issue a final order granting a motion for summary...

  17. On the design of learning outcomes for the undergraduate engineer's final year project

    NASA Astrophysics Data System (ADS)

    Thambyah, Ashvin

    2011-03-01

    The course for the final year project for engineering students, because of its strongly research-based, open-ended format, tends to not have well defined learning outcomes, which are also not aligned with any accepted pedagogical philosophy or learning technology. To address this problem, the revised Bloom's taxonomy table of Anderson and Krathwohl (2001) is utilised, as suggested previously by Lee and Lai (2007), to design new learning outcomes for the final year project course in engineering education. Based on the expectations of the engineering graduate, and integrating these graduate expectations into the six cognitive processes and four knowledge dimensions of the taxonomy table, 24 learning outcomes have been designed. It is proposed that these 24 learning outcomes be utilised as a suitable working template to inspire more critical evaluation of what is expected to be learnt by engineering students undertaking final year research or capstone projects.

  18. High/Scope Outreach Project. Final Report. October 1, 1983-September 30, 1984.

    ERIC Educational Resources Information Center

    High/Scope Educational Research Foundation, Ypsilanti, MI.

    The final report reviews accomplishments of an outreach project designed to provide technical assistance and training to early childhood programs for handicapped children. The project features the Cognitively Oriented Preschool Curriculum, a developmental approach based on Piagetian theory and explained to build on the child's accomplishments. A…

  19. Illinois State Project: Services for Children with Deaf-Blindness Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Dorsey, Christine

    This final report describes activities and accomplishments of the Illinois state project on services for children with deaf-blindness, a 3-year federally supported project to address the needs of children (ages birth to 21) who are deaf-blind. Project activities included inservice training and technical assistance, development of a comprehensive…

  20. Demonstration of Autonomous Rendezvous Technology (DART) Project Summary

    NASA Technical Reports Server (NTRS)

    Rumford, TImothy E.

    2003-01-01

    Since the 1960's, NASA has performed numerous rendezvous and docking missions. The common element of all US rendezvous and docking is that the spacecraft has always been piloted by astronauts. Only the Russian Space Program has developed and demonstrated an autonomous capability. The Demonstration of Autonomous Rendezvous Technology (DART) project currently funded under NASA's Space Launch Initiative (SLI) Cycle I, provides a key step in establishing an autonomous rendezvous capability for the United States. DART's objective is to demonstrate, in space, the hardware and software necessary for autonomous rendezvous. Orbital Sciences Corporation intends to integrate an Advanced Video Guidance Sensor and Autonomous Rendezvous and Proximity Operations algorithms into a Pegasus upper stage in order to demonstrate the capability to autonomously rendezvous with a target currently in orbit. The DART mission will occur in April 2004. The launch site will be Vandenburg AFB and the launch vehicle will be a Pegasus XL equipped with a Hydrazine Auxiliary Propulsion System 4th stage. All mission objectives will be completed within a 24 hour period. The paper provides a summary of mission objectives, mission overview and a discussion on the design features of the chase and target vehicles.

  1. 77 FR 34122 - Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... claim seeking judicial review of the FTA actions announced herein for the listed public transportation... given that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  2. 78 FR 33890 - Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-05

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  3. 78 FR 4191 - Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  4. 78 FR 16764 - Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  5. 77 FR 51106 - Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... claim seeking judicial review of the FTA actions announced herein for the listed public transportation... given that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  6. Summaries of 1984-85 NASA space-gravitational biology accomplishments

    NASA Technical Reports Server (NTRS)

    Halstead, T. W. (Compiler); Dutcher, F. R. (Compiler); Pleasant, L. G. (Compiler)

    1985-01-01

    Individual technical summaries of research projects of NASA's Space/Gravitational Biology Program are presented. The summaries for each project include a description of the research, a listing of the accomplishments, and an explanation of the significance of the accomplishments. Bibliographies for each project are also included.

  7. Development of Home Health Aide Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Brown, Patricia

    This package contains materials intended for use in a new home health aide curriculum that is designed to be presented as a two-quarter program at Tacoma Community College in Tacoma, Washington. Included in the package are a final report outlining the objectives and outcomes of the project to develop a home health aide curriculum that would meet…

  8. Faculty College. Final Project Report, July 1, 1976 through June 30, 1978.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Oshkosh.

    The final report of a faculty development project, sponsored by the Fund for the Improvement of Postsecondary Education, is presented. Project objectives were to: augment the existing Faculty College programming with special focus sessions, featuring national leaders who would treat issues in one of the developing areas of the institution; bring…

  9. EPA Region 10 Climate Change and TMDL Pilot – South Fork Nooksack River, Washington Final Report

    EPA Science Inventory

    This final report provides an overarching summary of the pilot research project, including the methods used in and the findings of the quantitative and qualitative assessments. It is written to appeal to a wide audience of policy makers, managers, agency staff and the general pub...

  10. Summary of Carbon Storage Incentives and Potential Legislation: East Sub-Basin Project Task 3.1 Business and Financial Case Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trabucchi, Chiara

    The CarbonSAFE Illinois – East Sub-Basin project is conducting a pre-feasibility assessment for commercial-scale CO2 geological storage complexes. The project aims to identify sites capable of storing more than 50 million tons of industrially-sourced CO2. To support the business development assessment of the economic viability of potential sites in the East Sub-Basin and explore conditions under which a carbon capture and storage (CCS) project therein might be revenue positive, this document provides a summary of carbon storage incentives and legislation of potential relevance to the project.

  11. ECM soldering technologies for small businesses. Final report/project accomplishments summary, project number 93-KCPP-015-E1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Becka, G.A.

    1997-03-01

    The purpose of this outreach project was to demonstrate, transfer, and educate multiple small and medium-sized US firms in the methodology and technology of environmentally conscious manufacturing soldering techniques. Consultation on replacement solvents for ozone-depleting chemicals, low residue/no clean soldering, and lead-free solder alloys were examples of available FM and T expertise. Depending upon the needs, materials engineering or process engineering help was made available under the program. Requesting businesses could obtain up to 250 hours of assistance from AlliedSignal FM and T on these efforts. The participating companies mainly requested assistance with their immediate needs. Examples of assistance providedmore » included specialized training for their particular product line. FM and T Solder Certification School has an excellent reputation and responded with solder training and help with course outlines for the requesters. One company reported problems soldering certain components. FM and T evaluations determined that the company was received components with solderability levels that did not meet specification rather than experiencing a soldering process problem. Other companies received assistance in incorporating lead-free soldering materials into their production lines and development assistance with fluxless soldering processes. The project was terminated when it was determined that this need could be served by FM and T`s current Technical Assistance Program.« less

  12. The Elder Abuse Prevention Project, Phase Two, Three and Four. Final Report.

    ERIC Educational Resources Information Center

    Regina Univ. (Saskatchewan). Univ. Extension. Seniors Education Centre.

    This document presents the final report from an educational and community development program designed to raise awareness about the abuse and neglect of the elderly. The Elder Abuse Prevention Project is briefly described in terms of project goals, objectives, the model used, the target groups served, and the evaluation processes employed. It is…

  13. [The LORAS Project and quality assurance. In four years from input- to outcome-oriented financing in public health. 1: The LORAS Project].

    PubMed

    Lenz, M J; Hochreutener, M A

    2001-02-01

    This series of three articles is a summary of the operations, findings and results of the hospital reform projects in the Canton of Zurich, termed LORAS. With the aid of the LORAS project within four years Zurich hospitals have been transformed. Whereas they used to adhere to input-oriented covering of deficits they now operate with outcome-oriented prospective financing of output. Part 1 describes the whole Project. Part 2 focuses on the development of outcome-measurement. Part 3 finally describes the implementation of the outcome-measurement in the canton of Zurich.

  14. 2020 Vision Project Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gordon, K.W.; Scott, K.P.

    2000-11-01

    Since the 2020 Vision project began in 1996, students from participating schools have completed and submitted a variety of scenarios describing potential world and regional conditions in the year 2020 and their possible effect on US national security. This report summarizes the students' views and describes trends observed over the course of the 2020 Vision project's five years. It also highlights the main organizational features of the project. An analysis of thematic trends among the scenarios showed interesting shifts in students' thinking, particularly in their views of computer technology, US relations with China, and globalization. In 1996, most students perceivedmore » computer technology as highly beneficial to society, but as the year 2000 approached, this technology was viewed with fear and suspicion, even personified as a malicious, uncontrollable being. Yet, after New Year's passed with little disruption, students generally again perceived computer technology as beneficial. Also in 1996, students tended to see US relations with China as potentially positive, with economic interaction proving favorable to both countries. By 2000, this view had transformed into a perception of China emerging as the US' main rival and ''enemy'' in the global geopolitical realm. Regarding globalization, students in the first two years of the project tended to perceive world events as dependent on US action. However, by the end of the project, they saw the US as having little control over world events and therefore, we Americans would need to cooperate and compromise with other nations in order to maintain our own well-being.« less

  15. 40. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H. GENERAL VIEW OT THE PROJECT SHOWING CONSPICUOUS SCARS. THE BEFORE PHOTO OF A BEFORE AND AFTER SET. AFTER PHOTO IS HI-52-41. - Haleakala National Park Roads, Pukalani, Maui County, HI

  16. 77 FR 67662 - Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... decommission a solar photovoltaic electricity generating facility with a proposed output of 150 megawatts and a... CACA 49491] Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact...) Plan Amendment and Final Environmental Impact Statement (EIS) for the Desert Harvest Solar Project and...

  17. Navy Career Education Diffusion Project: State of Oregon. Final Report.

    ERIC Educational Resources Information Center

    McDermott, Michael M.

    The final report describes a project to research, develop, and field test Navy occupational information for inclusion into the Oregon Career Information System (CIS), a computer-assisted career education program. Five sections include: (1) introductory information; (2) a discussion of the preparation of Navy occupational information and reviewing…

  18. SELF (Supports for Early Learning Foundations): A Non-Directed Model Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Harrison, Holly

    This final report describes achievements and activities of Project SELF (Supports for Early Learning Foundations), a federally funded project in New Mexico which developed, evaluated, and replicated an innovative model that provides strategies for early interventionists and families to support early learning foundations. The project identified…

  19. Studies in Bilingual Evaluation, Work Unit I: Bilingual Prediction Project. Final Report.

    ERIC Educational Resources Information Center

    de Porcel, Antonio; And Others

    The final report of the Bilingual Prediction Project presents a review of the project from its inception in 1975 through completion in 1979. The main goal was to predict a student's academic ability in English. A prediction index was constructed in two stages. The first stage was a description of the target population and their school setting, as…

  20. 17 CFR 8.28 - Final decision.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Final decision. 8.28 Section 8.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION EXCHANGE PROCEDURES FOR DISCIPLINARY, SUMMARY, AND MEMBERSHIP DENIAL ACTIONS Summary Actions § 8.28 Final decision. Each exchange shall...

  1. Zachary-Fort Lauderdale pipeline construction and conversion project: final supplement to final environmental impact statement. Docket No. CP74-192

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.

  2. Palmdale Energy Project; Final Decision; Prevention of Significant Deterioration (PSD) Permit

    EPA Pesticide Factsheets

    EPA Region 9 is issuing a final decision to grant conditional approval, in accordance with the Clean Air Act, for the construction of a natural gas-fired combined cycle power plant known as the Palmdale Energy Project.

  3. AdaNET executive summary

    NASA Technical Reports Server (NTRS)

    Digman, R. Michael

    1988-01-01

    The goal of AdaNET is to transfer existing and emerging software engineering technology from the Federal government to the private sector. The views and perspectives of the current project participants on long and short term goals for AdaNET; organizational structure; resources and returns; summary of identified AdaNET services; and the summary of the organizational model currently under discussion are presented.

  4. Northeast Oregon Hatchery Project, Final Siting Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and directmore » release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.« less

  5. 75 FR 28851 - Notice of Final Federal Agency Actions on Proposed Highway in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-24

    ... of limitation on claims for judicial review of actions by FHWA. SUMMARY: This notice announces... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed within...

  6. Compendium of Executive Summaries from the Maglev System Concept Definition. Final Reports.

    DTIC Science & Technology

    1993-03-01

    This report contains the Executive Summaries from the four System Concept Definition (SCD) studies awarded under the National Maglev Initiative...These summaries present the technical feasibility, performance, capital, operating and maintenance costs for a maglev system that would be available by

  7. IRIS Toxicological Review of Benzo[a]pyrene (Final Report) ...

    EPA Pesticide Factsheets

    EPA has finalized the Integrated Risk Information System (IRIS) assessment of benzo[a]pyrene. This assessment addresses the potential cancer and noncancer human health effects from long-term exposure to benzo[a]pyrene. Now final, this assessment will update the toxicological information on benzo[a]pyrene posted in 1987. EPA’s program and regional offices may use this assessment to inform decisions to protect human health. EPA is undertaking an update of the Integrated Risk Information System (IRIS) health assessment for benzo[a]pyrene (BaP). The outcome of this project is an updated Toxicological Review and IRIS Summary for BaP that will be entered into the IRIS database.

  8. Resource management and operations in central North Dakota: Climate change scenario planning workshop summary November 12-13, 2015, Bismarck, ND

    USGS Publications Warehouse

    Fisichelli, Nicholas A.; Schuurman, Gregor; Symstad, Amy J.; Ray, Andrea; Friedman, Jonathan M.; Miller, Brian; Rowland, Erika

    2016-01-01

    The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the central North Dakota focal area, with an emphasis on Knife River Indian Villages National Historic Site. The report explainsscenario planning as an adaptation tool in general, then describes how it was applied to the central North Dakota focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held November 12-13, 2015 in Bismarck, ND, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.

  9. Using Simulation Technology to Promote Social Competence of Handicapped Students. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Appell, Louise S.; And Others

    The purpose of this project was to design and develop simulation materials utilizing vocational situations) in mildly/moderately handicapped young adults. The final product, a set of materials titled "Social Skills on the Job," includes a videotape of 15 lessons, a computer software package, and a teacher's guide, and was marketed to a commercial…

  10. 76 FR 12096 - McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Project; Notice of Availability of the Final Environmental Impact Statement for the Mccloud-Pit... Pit Rivers in Shasta County, California and has prepared a final environmental impact statement (EIS... and the alternatives for relicensing the McCloud-Pit Project. The final EIS documents the views of...

  11. Project Target: Criterion-Referenced Physical Fitness Standards for Adolescents with Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Winnick, Joseph P.; Short, Francis X.

    This final report discusses the outcomes of a project designed to extend the nation's current emphasis on health-related, criterion-referenced fitness testing and programming to children and adolescents with disabilities. It summarizes project activities leading up to the Brockport Physical Fitness Test and related measures. Activities included:…

  12. The Indiana Deafblind Services Project: Services for Children with Deafblindness Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Indiana State Univ., Terre Haute. Blumberg Center for Interdisciplinary Studies in Special Education.

    This final report describes activities and accomplishments of the Indiana Deaf-Blind Services Project, a 4-year federally funded project to enhance and further develop coordinated direct services to children and youth, birth through 2 and ages 18 through 21. The project also was designed to provide technical assistance to public and private…

  13. Griffith Energy Project Final Environmental Impact Statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner,more » needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.« less

  14. 76 FR 56973 - Office of National Marine Sanctuaries Final Policy and Permit Guidance for Submarine Cable Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... National Marine Sanctuaries Final Policy and Permit Guidance for Submarine Cable Projects AGENCY: Office of National Marine Sanctuaries (ONMS), National Oceanic and Atmospheric Administration (NOAA), Department of... Marine Sanctuaries (ONMS) has developed final policy and permitting guidance for submarine cable projects...

  15. Safety of railroad passenger vehicle dynamics : final summary report

    DOT National Transportation Integrated Search

    2002-07-01

    This report is a summary of all the work done by Foster-Miller on the passenger rail vehicle dynamic safety under the contract awarded by the FRA. The report presents key issues and findings in the safety assessments and a safety assessment methodolo...

  16. Expressive Arts Project for Young Children with Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Hutinger, Patricia L.

    This final report describes activities and accomplishments of the Expressive Arts Project for Young Children with Disabilities, which developed and evaluated a CD-ROM, ArtSpace. The program, developed on a Macintosh platform, allows the child to either view or make art. It offers real time video, music especially produced to accompany images,…

  17. Using a Multimedia Final Project in an IT Ethics Course

    ERIC Educational Resources Information Center

    Howard, Elizabeth V.; Woods, David M.

    2016-01-01

    In previous semesters of our IT Ethics course, students created traditional final projects where they presented some topic in IT Ethics that we did not cover during the course. Students were free to choose how they would present their information with most groups choosing a traditional presentation where some members of the group were clearly…

  18. Leading Curriculum Innovation in Primary Schools Project: A Final Report

    ERIC Educational Resources Information Center

    Brundrett, Mark; Duncan, Diane

    2015-01-01

    This article provides the final report on a research project that investigated the ways in which curriculum innovation can be led successfully in primary schools. Data gathering included 40 semi-structured interviews in 10 successful primary schools in England of varying sizes and types and in a range of geographical and social locations. Findings…

  19. Energy engineering analysis study report, Milan Army Ammunition Plant, Milan, Tennessee: Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1982-09-01

    This report is a summary of the Energy Engineering Analysis for the Milan Army Ammunition Plant (MAAP) in Milan, Tennessee. It includes the recommendations for the development of a Basewide Energy Plan consisting of energy conservation projects and other recommendations for reduction of the installation`s 1985 source energy consumption. Milan Army Ammunition Plant, containing 22,541 acres, is situated in both Gibson and Carroll Counties, Tennessee, and is approximately equally divided longitudinally into the two counties. The Milan area experiences typically short mild winters and long warm summers. With the exception of a few modernized facilities, the overwhelming majority of buildingsmore » at MAAP were constructed for World War II ammunition production.« less

  20. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adonizio, Mary Ann; Corren, Dean; Smith, Ron

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  1. Assessment of the components of the Kalimantan and Sulawesi power development project: Volume 1 -- Executive summary. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-03-31

    This report, conducted by Utility Consulting was funded by the US Trade and Development Agency. The report concerns a power development project on the islands of Kalimantan and Sulawesi. This is Volume 1, The Executive Summary, and it summarizes the findings, conclusions and recommendations of this three volume study.

  2. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  3. [The LORAS project and quality assurance. In four years from input- to outcome-oriented financing in public health. 2: LORAS project outcome parts 1 & 98].

    PubMed

    Lenz, M J; Hochreutener, M A

    2001-04-01

    This series of three articles is a summary of the operations, findings and results of the hospital reform projects in the Canton of Zurich, termed LORAS. With the aid of the LORAS project within four years Zurich hospitals have been transformed. Whereas they used to adhere to input-oriented covering of deficits they now operate with outcome-oriented prospective financing of output. Part 1 describes the whole project. Part 2 focuses on the development of outcome-measurement. Part 3 finally describes the implementation of the outcome-measurement in the canton of Zurich.

  4. Staff Helping Attain Relevant Education (Project SHARE): Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Ranadive, Jyoti

    Project SHARE (Staff Helping Attain Relevant Education), a project funded by Title VII of the Elementary and Secondary Education Act, was in its third and final year of operation in 1992-93, in eight primary schools in the Bronx, Brooklyn, and Manhattan (New York). The project served 141 limited English proficient students from low-income families…

  5. 75 FR 7029 - Notice of Availability of the Final Environmental Assessment for Solar Roof Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-16

    ... Assessment for Solar Roof Project AGENCY: United States Geological Survey. ACTION: Notice of availability... Final Environmental Assessment for the Solar Roof Project and by this notice is announcing its... Individuals wishing to receive copies of the Environmental Assessment for the Solar Roof Project should...

  6. A Largely Unsatisfied Need: Continuing Professional Development for Process and Process Plant Industries. A Summary. FEU/PICKUP Project Report.

    ERIC Educational Resources Information Center

    Geldhart, D.; Brown, A. S.

    This summary report outlines the aims of a project that focused on provision of short courses for technical professionals in the chemical and allied process industry and the process plant industry. Continuing education needs of both companies and individuals, as well as corporate policies and attitudes toward continuing education and constraints…

  7. 38. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. BRIDGE AT STATION 85+. - Haleakala National Park Roads, Pukalani, Maui County, HI

  8. Development of a Hydrologic Characterization Technology for Fault Zones Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karasaki, Kenzi; Onishi, Celia Tiemi; Doughty, Christine

    2012-03-31

    This is the final report for the five-year program of the NUMO-LBNL collaborative project (hereafter called the Project): Development of Hydrologic Characterization Technology for Fault Zones, under a NUMO-DOE/LBNL collaboration agreement. Detailed results from the past four years of study can be found in the each year’s year-end report (Karasaki et al., 2008, 2009, 2010, and 2011; Kiho et al., 2008, 2009, 2010, and 2011). In this report, we discuss the results of the studies conducted in FY2011. We also give a summary of the overall results and findings, as well as the lessons learned during the course of themore » Project.« less

  9. 12 CFR 19.29 - Summary disposition.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... law judge shall recommend that the Comptroller issue a final order granting a motion for summary... days after service of such a motion, or within such time period as allowed by the administrative law... administrative law judge may hear oral argument on the motion for summary disposition. (d) Decision on motion...

  10. 12 CFR 19.29 - Summary disposition.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... law judge shall recommend that the Comptroller issue a final order granting a motion for summary... days after service of such a motion, or within such time period as allowed by the administrative law... administrative law judge may hear oral argument on the motion for summary disposition. (d) Decision on motion...

  11. 12 CFR 19.29 - Summary disposition.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... law judge shall recommend that the Comptroller issue a final order granting a motion for summary... days after service of such a motion, or within such time period as allowed by the administrative law... administrative law judge may hear oral argument on the motion for summary disposition. (d) Decision on motion...

  12. 12 CFR 19.29 - Summary disposition.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... law judge shall recommend that the Comptroller issue a final order granting a motion for summary... days after service of such a motion, or within such time period as allowed by the administrative law... administrative law judge may hear oral argument on the motion for summary disposition. (d) Decision on motion...

  13. 12 CFR 747.29 - Summary disposition.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ADMINISTRATIVE ACTIONS, ADJUDICATIVE HEARINGS, RULES OF PRACTICE AND PROCEDURE, AND INVESTIGATIONS Uniform Rules... shall recommend that the NCUA Board issue a final order granting a motion for summary disposition if the... motion for summary disposition show that: (1) There is no genuine issue as to any material fact; and (2...

  14. 78 FR 39824 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... information in the summary is intended to affect the legal status of the petition or its final disposition...

  15. 78 FR 978 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... information in the summary is intended to affect the legal status of the petition or its final disposition...

  16. 78 FR 17746 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... information in the summary is intended to affect the legal status of the petition or its final disposition...

  17. Freight planning support system : final summary report

    DOT National Transportation Integrated Search

    2003-07-01

    This report summarizes the activities and the findings of the Freight Planning Support System (FPSS) project conducted for the North Jersey Transportation Planning Authority (NJTPA). The underlying purpose of the project is to allow for better projec...

  18. Final Technical Report, Wind Generator Project (Ann Arbor)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geisler, Nathan

    A Final Technical Report (57 pages) describing educational exhibits and devices focused on wind energy, and related outreach activities and programs. Project partnership includes the City of Ann Arbor, MI and the Ann Arbor Hands-on Museum, along with additional sub-recipients, and U.S. Department of Energy/Office of Energy Efficiency and Renewable Energy (EERE). Report relays key milestones and sub-tasks as well as numerous graphics and images of five (5) transportable wind energy demonstration devices and five (5) wind energy exhibits designed and constructed between 2014 and 2016 for transport and use by the Ann Arbor Hands-on Museum.

  19. 36. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. TYPICAL RUBBLE MASONRY HEADWALL AND BOX CULVERT. - Haleakala National Park Roads, Pukalani, Maui County, HI

  20. 76 FR 19744 - Final Tropic to Hatch 138 kV Transmission Line Project Environmental Impact Statement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... DEPARTMENT OF AGRICULTURE Forest Service Final Tropic to Hatch 138 kV Transmission Line Project..., has prepared a Final Environmental Impact Statement (FEIS) for the Tropic to Hatch 138 kV Transmission.... ADDRESSES: Copies of the Tropic to Hatch 138 kV Transmission Line Project FEIS/PMPA for the Grand Staircase...

  1. Supervisors' Perceptions of Research Competencies in the Final-Year Project

    ERIC Educational Resources Information Center

    Reguant, Mercedes; Martínez-Olmo, Francesc; Contreras-Higuera, Williams

    2018-01-01

    Background: This paper analyses the development of research competencies in higher education students, particularly with regard to the undergraduate Final-Year Project (FYP). The FYP is understood as an assignment that requires the integration of learning outcomes and demonstration of competencies for the successful completion of the degree.…

  2. The Effects of Learning Communities for Students in Developmental Education: A Synthesis of Findings from Six Community Colleges. Executive Summary

    ERIC Educational Resources Information Center

    Visher, Mary G.; Weiss, Michael J.; Weissman, Evan; Rudd, Timothy; Wathington, Heather D.

    2012-01-01

    In 2006, the National Center for Postsecondary Research, of which is MDRC is a partner, launched a demonstration of one-semester learning community programs at six colleges; five of these programs focused on developmental education. This is the executive summary of the final report from the project and includes findings from analyses that pool…

  3. Project: MOBILITY. Introduction and Summary.

    ERIC Educational Resources Information Center

    Fresno City Coll., CA.

    This report summarizes a project designed to develop vocational educational programs and services for educationally disadvantaged and physically handicapped students at Fresno City College, California. The introduction provides an overview of the two phases of the project: phase I, a needs assessment; and phase II, curriculum development and…

  4. CBSS Outreach Project: Computer-Based Study Strategies for Students with Learning Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Anderson-Inman, Lynne; Ditson, Mary

    This final report describes activities and accomplishments of the four-year Computer-Based Study Strategies (CBSS) Outreach Project at the University of Oregon. This project disseminated information about using computer-based study strategies as an intervention for students with learning disabilities and provided teachers in participating outreach…

  5. 35. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. LOOKING BACK FROM STATION 335 AT RETURN CURVE. - Haleakala National Park Roads, Pukalani, Maui County, HI

  6. The 1990-1991 project summaries

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The Mechanical Engineering Department at The University of Texas at Austin participated in the NASA/USRA University Advanced Design Program on both an undergraduate and a graduate level during the 1990-91 academic year. The focus of study was on four design projects that fall into one of the following areas: (1) the establishment of a lunar base and (2) mission planet Earth. The design projects were incorporated into already existing design courses and students worked together in groups of three to five. A background of each area of study is provided, along with synopses, conclusions, and recommendations for further study for each design project.

  7. Briefing book: Major projects in the upstream, downstream, petrochemical and power sectors of Vietnam. Final definitional mission report. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-04-06

    The purpose of the briefing book is to provide project information to U.S. Businesses who seek cooperative partnerships with Vietnamese officials on a number of major development projects. The report is divided into the following sections: (1) Executive Summary; (2) Overview of Vietnam; (3) Overview of the Upstream Sector; (4) Overview of the Downstream Sector; (5) Overview of the Petrochemical Sector; (6) Overview of the Electric Energy Sector; (7) Project Development Processes; (8) Project Financing; (9) Foreign Competition and U.S. Competitiveness; (10) Project Profiles; (11) Key Contracts; (12) U.S. Commercial Service.

  8. A Process Evaluation of Project Developmental Continuity. Interim Report III, Executive Summary: Preliminary Recommendations for the Study of Child Impact.

    ERIC Educational Resources Information Center

    Granville, Arthur C.; And Others

    This executive summary presents the major findings of Interim Report III, which reports preliminary evaluation of Project Developmental Continuity (PDC). A Head Start demonstration program, PDC is aimed at promoting greater educational and developmental continuity as children make the transition from preschool to school. The report addresses three…

  9. Summary of NREL's FY13-FY15 Photovoltaic Subprogram

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2017-03-31

    In this report, you will find summaries of the completed FY13-FY15 Photovoltaic projects that were funded within NREL. The summaries describe the initial motivation for the project; significant achievements, including publications, intellectual property, and collaborations; and remaining challenges. Among the NREL projects, you will find research of almost every major PV technology - from the next generation of silicon PV to relatively new organic PVs - as well as projects advancing PV module durability and characterization. Each of these projects was designed to support SunShot's goals, putting the United States one step closer to widespread use of low-cost, clean electricity.

  10. Sarawak-west Kalimantan interconnection study. Final report. Volume 1, executive summary. Volume 2, main report. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-01-06

    The study, conducted by Sargent & Lundy, was funded by the U.S. Trade and Development Agency on behalf of the Sarawak Electricity Supply Corporation. The purpose of the project is to determine the feasibility of an interconnection of the electric power systems of Sarawak and West Kalimantan as is being done elsewhere in the region. The report presents technical and economic evaluations and assesses the realibility of the system after the interconnection. The study is divided into three volumes. The report combines the Executive Summary (Volume 1) and the Main Report (Volume 2).

  11. Project Continuity: A Handicapped Children's Early Education Project. Final Report, October 1, 1986 to September 30, 1989.

    ERIC Educational Resources Information Center

    Jackson, Barbara; Quinn, Judy

    The final report describes Project Continuity, a federally funded effort to provide continuity of care for handicapped infants with chronic illness or complex medical needs while in the acute care setting and to facilitate transition of the infant into the home environment. Goals were accomplished within the context of a family-centered…

  12. Resource management and operations in southwest South Dakota: Climate change scenario planning workshop summary January 20-21, 2016, Rapid City, SD

    USGS Publications Warehouse

    Fisichelli, Nicholas A.; Schuurman, Gregor W.; Symstad, Amy J.; Ray, Andrea; Miller, Brian; Cross, Molly; Rowland, Erika

    2016-01-01

    The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the southwest South Dakota grasslands focal area, with an emphasis on Badlands National Park and Buffalo Gap National Grassland. The report explains scenario planning as an adaptation tool in general, then describes how it was applied to the focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held January 20-21, 2016 in Rapid City, South Dakota, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.

  13. 77 FR 41369 - Dairyland Power Cooperative: CapX 2020 Hampton-Rochester-La Crosse Transmission Line Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... DEPARTMENT OF AGRICULTURE Rural Utilities Service Dairyland Power Cooperative: CapX 2020 Hampton-Rochester-La Crosse Transmission Line Project AGENCY: Rural Utilities Service, USDA. ACTION: Notice of Availability of a Final Environmental Impact Statement. SUMMARY: Notice is hereby given that the Rural...

  14. Classrooms beyond School Walls for Grades K-12. Mamaroneck Career Education Project. Final Report.

    ERIC Educational Resources Information Center

    Mamaroneck Union Free School District 1, NY.

    This document contains two reports on the Classrooms beyond Walls Career Education Project conducted by the Mamaroneck Union Free School District and the Sound Consortium for grades K-12 in the 1975-76 school year. The final report summarizes the project's major objectives (increasing self-awareness and decision-making skills, training teachers in…

  15. 37. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. HAND-LAID ROCK BERM ON RETURN CURVE TO PREVENT SCOUR AND SEEPAGE THROUGH FILLS. - Haleakala National Park Roads, Pukalani, Maui County, HI

  16. 77 FR 31064 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  17. 78 FR 53818 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  18. 78 FR 24290 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  19. 78 FR 17746 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  20. 77 FR 36333 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  1. 75 FR 20881 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  2. 77 FR 58210 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  3. 78 FR 35353 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  4. 75 FR 60859 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  5. 77 FR 35103 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  6. 78 FR 56768 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  7. 75 FR 26839 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  8. 78 FR 66098 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  9. 76 FR 9852 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  10. 78 FR 978 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  11. 76 FR 2746 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  12. 78 FR 34139 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  13. 76 FR 51119 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  14. 78 FR 39825 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  15. 78 FR 979 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ...] Petition for Exemption; Summary of Petition Received AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of petition for exemption received. SUMMARY: This notice contains a summary of a petition... the legal status of the petition or its final disposition. DATES: Comments on this petition must...

  16. Research and Development Project in Career Education. Final Report. Volume III.

    ERIC Educational Resources Information Center

    Washington State Coordinating Council for Occupational Education, Olympia.

    The final volume in the report on the Research and Development Project in Career Education is in two parts. The first, "Interest Inventories, Tests, Surveys, and Scales: A Compilation," is by James T. Jurgens. It is designed to acquaint teachers and counselors with 66 interest measurement instruments that are presently on the market. For most,…

  17. 78 FR 23630 - Notice of Final Federal Agency Actions on State Highway 99 (Segment C) in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ...: Notice of Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies. SUMMARY... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before...

  18. Project Future Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…

  19. Minnesota Department of Transportation (Mn/DOT) cadastral and right of way data sharing pilot project : phase 1 and phase 2 summary report.

    DOT National Transportation Integrated Search

    2007-12-10

    The Cadastral and Right of Way Data Sharing Pilot Project is divided into three phases: Phase 1 Identify Information to Share, Phase 2 Information Collection, Phase 3 Web-based Information Access and Transfer. The Phase 1 and Phase 2 Summary Report d...

  20. 39. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H., by Merel S. Sager, Resident Landscape Architect, April 16, 1935. COVERING CONSPICOUS ROCK FILLS WITH SOIL. - Haleakala National Park Roads, Pukalani, Maui County, HI

  1. The Satellite based Monitoring Initiative for Regional Air quality (SAMIRA): Project summary and first results

    NASA Astrophysics Data System (ADS)

    Schneider, Philipp; Stebel, Kerstin; Ajtai, Nicolae; Diamandi, Andrei; Horalek, Jan; Nemuc, Anca; Stachlewska, Iwona; Zehner, Claus

    2017-04-01

    We present a summary and some first results of a new ESA-funded project entitled Satellite based Monitoring Initiative for Regional Air quality (SAMIRA), which aims at improving regional and local air quality monitoring through synergetic use of data from present and upcoming satellite instruments, traditionally used in situ air quality monitoring networks and output from chemical transport models. Through collaborative efforts in four countries, namely Romania, Poland, the Czech Republic and Norway, all with existing air quality problems, SAMIRA intends to support the involved institutions and associated users in their national monitoring and reporting mandates as well as to generate novel research in this area. The primary goal of SAMIRA is to demonstrate the usefulness of existing and future satellite products of air quality for improving monitoring and mapping of air pollution at the regional scale. A total of six core activities are being carried out in order to achieve this goal: Firstly, the project is developing and optimizing algorithms for the retrieval of hourly aerosol optical depth (AOD) maps from the Spinning Enhanced Visible and InfraRed Imager (SEVIRI) onboard of Meteosat Second Generation. As a second activity, SAMIRA aims to derive particulate matter (PM2.5) estimates from AOD data by developing robust algorithms for AOD-to-PM conversion with the support from model- and Lidar data. In a third activity, we evaluate the added value of satellite products of atmospheric composition for operational European-scale air quality mapping using geostatistics and auxiliary datasets. The additional benefit of satellite-based monitoring over existing monitoring techniques (in situ, models) is tested by combining these datasets using geostatistical methods and demonstrated for nitrogen dioxide (NO2), sulphur dioxide (SO2), and aerosol optical depth/particulate matter. As a fourth activity, the project is developing novel algorithms for downscaling coarse

  2. The Arctic Predictability and Prediction on Seasonal-to-Interannual TimEscales (APPOSITE) project: a summary

    NASA Astrophysics Data System (ADS)

    Hawkins, Ed; Day, Jonny; Tietsche, Steffen

    2016-04-01

    Recent years have seen significant developments in seasonal-to-interannual timescale climate prediction capabilities. However, until recently the potential of such systems to predict Arctic climate had not been assessed. We describe a multi-model predictability experiment which was run as part of the Arctic Predictability and Prediction On Seasonal to Inter-annual TimEscales (APPOSITE) project. The main goal of APPOSITE was to quantify the timescales on which Arctic climate is predictable. In order to achieve this, a coordinated set of idealised initial-value predictability experiments, with seven general circulation models, was conducted. This was the first model intercomparison project designed to quantify the predictability of Arctic climate on seasonal to inter-annual timescales. Here we provide a summary and update of the project's results which include: (1) quantifying the predictability of Arctic climate, especially sea ice; (2) the state-dependence of this predictability, finding that extreme years are potentially more predictable than neutral years; (3) analysing a spring 'predictability barrier' to skillful forecasts; (4) initial sea ice thickness information provides much of the skill for summer forecasts; (5) quantifying the sources of error growth and uncertainty in Arctic predictions. The dataset is now publicly available.

  3. Manufacturing Methods and Technology Project Summary Reports

    DTIC Science & Technology

    1982-06-01

    Effect Cathode SUMMARY Many of the problems associated with the processes shown in the process flow chart. Figure 2, were solved. The stress that...presence of this tape provides stress points in the encapsulant and can cause it to crack under thermal cycling, creates the possibility of...observed at the inner bore ^P diameter, confirming stresses in excess of the material yield strength at the highest speeds. Based upon these

  4. The CDCC's Project No. 7: "The Education and Cultural Development of Migrants." Final Report of the Project Group.

    ERIC Educational Resources Information Center

    Council for Cultural Cooperation, Strasbourg (France).

    The final report of a project group representing the 18 member countries of the Council of Europe Council for Cultural Co-operation investigates education and cultural development of migrants. The report discusses methodology and reasons for selecting an intercultural approach to migrant education in terms of interculturalism's basic elements:…

  5. Final Environmental Impact Statement on Debris Removal from Boston Harbor, Massachusetts. Revision.

    DTIC Science & Technology

    1980-05-01

    34Trace Metal Analysis of Boston Harbor Waters and Sediments", July 1972. Storey , D. A., "The Massachusetts Marina Boatyard Industry 1972-1973", Mass...is possible that a feasible re-use alternative will be identified during the final design stage of the project. If this happens, and the method of re...points. Coliform counts in the Outer Harbor routinely exceed the SB standard designated for that area. 2.27 In summary, the Harbor receives a heavy

  6. Preparing Teachers for Diversity: The Role of Initial Teacher Education. Annex 2 To the Final Report to DG Education, Youth, Sport and Culture of the European Commission. Case Study Summaries

    ERIC Educational Resources Information Center

    European Commission, 2017

    2017-01-01

    "Preparing Teachers for Diversity: The Role of Initial Teacher Education. Annex 2 To the Final Report to DG Education, Youth, Sport and Culture of the European Commission. Case Study Summaries" is designed as a companion document to the final report "Preparing Teachers for Diversity: The Role of Initial Teacher Education. Final…

  7. STP 4-06 Model-Based Technical Data in Procurement, 3D PDF Technology Data Demonstration Project. Phase 1 Summary

    DTIC Science & Technology

    2015-07-01

    O R G STP 4-06 MODEL-BASED TECHNICAL DATA IN PROCUREMENT 3D PDF TECHNOLOGY DATA DEMONSTRATION PROJECT PHASE 1 SUMMARY REPORT DL309T2...LMI’s ISO- certified quality management procedures. J U L Y 2 0 1 5 STP 4-06 MODEL-BASED TECHNICAL DATA IN PROCUREMENT 3D PDF TECHNICAL DATA...Based Technical Data ..................................................................................... 5 3D PDF Demonstration Team

  8. Project Developmental Continuity Evaluation: Final Report. Volume II: The Process of Program Implementation in PDC.

    ERIC Educational Resources Information Center

    Wacker, Sally; And Others

    The second of two volumes, this document continues the final evaluation report of Project Developmental Continuity (PDC), a Head Start demonstration project initiated in 1974 to develop program models which enhance children's social competence by fostering developmental continuity from preschool through the early elementary grades. In particular,…

  9. Project to Incorporate Anthropological Concepts of Human Diversity in Secondary School Social Studies Curricula (Project Anthropology). Final Report, 2/1/80 to 1/31/82.

    ERIC Educational Resources Information Center

    Giannangelo, Duane M.; And Others

    Learning modules emphasizing the anthropological aspects of human and race relations to supplement social studies textbooks used in grades 7-12 were developed. The final report describes pre-project activities, module development, and project evaluation and accomplishments. Pre-project activities included media publicity, reviewing social studies…

  10. Project CREATE Final Report. Cooperative Resources To Enhance Access to Technology Education.

    ERIC Educational Resources Information Center

    Hampden County Employment and Training Consortium, Springfield, MA.

    These materials have been developed by Project CREATE (Cooperative Resources to Enhance Access to Jobs through Technical Education), a demonstration program designed to develop a network, specific activities, and resources that would provide education and support services to a wide audience. A 13-page final report describes the hands-on training…

  11. School Age Multihandicapped Project: Capital Area Rehabilitation Center. Final Report 1977-1980.

    ERIC Educational Resources Information Center

    Capital Area Rehabilitation Center, Austin, TX.

    The document contains the final report of a model project to provide a therapeutically based educational program for severely handicapped, orthopedically impaired children (6 to 21 years old) utilizing the skills of teachers, aides, therapists, and a nurse to provide individualized hands on services. Section I contains an overview of the…

  12. 78 FR 45268 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... decommission the Ocotillo Sol Solar Project, a solar photovoltaic (PV) power plant facility, on approximately... Applicant's Proposed Project to construct, operate, maintain, and decommission a 100-acre solar PV facility...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final Environmental...

  13. Building a Network of Services: 1963-1971. Final Report: Greater Cleveland Mental Retardation Development Project.

    ERIC Educational Resources Information Center

    Buckman, Rilma Oxley

    The final report documents the Greater Cleveland Mental Retardation Development Project, a 5-year demonstration project concerned with solving such problems as how a community can provide all the services and programs needed by the retarded and their families, ensure successful and appropriate employment, and staff and finance such programs.…

  14. Skylab Student Project: Summary Description

    NASA Technical Reports Server (NTRS)

    Floyd, Henry B.

    1973-01-01

    In 1971 the NASA conceived the Skylab student project in an effort to involve the general public in the Skylab program. The primary aim of this project was to stimulate national interest in science and technology. NASA decided to direct the Skylab student project to those young people who have indicated an interest in science and technology and to foster this interest through direct participation in an ongoing program emphasizing as wide a spectrum of science and technology as possible. Skylab, with the opportunity it gives to provide experiments in areas of science and technology provided the ideal opportunity for such participation. In implementing this project, the National Science Teachers Association (NSTA), having an existing, closely associated contact with students, grades 9 through 12, in United States schools, was asked to sponsor, organize, and administer a national competition for high school students. This competition called for individual students (or groups of students) to develop meaningful experiments to be flown on Skylab. To facilitate the organization and administration of this program, the NSTA divided the participating students into their 12 geographical regions with a regional chairmen appointed to receive all proposals for his region. The regional chairmen then appointed a committee of eminent scientists, engineers, and science educators to evaluate each proposal. Some 80,000 applications were requested by teachers and 3409 proposals were submitted. Moreover, because of team proposals, over 4000 students participated and approximately 300 regional winners selected. Each participant received a certification of merit. The 300 winning regional proposals were transmitted to the NSTA headquarters where they were further screened. In March of 1972 twenty-five national winners and 22 special mentions were announced. The 25 winning students were then assigned science advisers at the George C. Marshall Space Flight center (MSFC), the center selected

  15. Manufacturing Methods and Technology Project Summary Reports

    DTIC Science & Technology

    1985-06-01

    Computer -Aided Design (CAD)/ Computer -Aided Manufacturing (CAM) Process for the Production of Cold Forged Gears Project 483 6121 - Robotic Welding and...Caliber Projectile Bodies Project 682 8370 - Automatic Inspection and 1-I1 Process Control of Weapons Parts Manufacturing METALS Project 181 7285 - Cast...designed for use on each project. Experience suggested that a general purpose computer interface might be designed that could be used on any project

  16. The Collaborative Planning Outreach Project: Building Comprehensive Early Childhood Systems. Final Report.

    ERIC Educational Resources Information Center

    Smith, Barbara J.

    This final report describes the objectives, activities and outcomes of a federally funded initiative to train and assist early childhood interagency teams in a model of planning systems and services for all young children, including children with disabilities and other special needs. The project is based on the value of stakeholder ownership in…

  17. Through Shared Windows: Outreach Project for Infants, Toddlers, and Children with Developmental Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Harrison, Holly

    This final report describes activities and accomplishments of the Through Shared Windows (TSW) Outreach Project, a 4-year project at the University of New Mexico designed to improve services to young children with disabilities and their families. Three major outcomes were accomplished. First, a Web site was developed that focuses on observational…

  18. 77 FR 23740 - Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ...We, the U.S. Fish and Wildlife Service (Service) and the California Department of Fish and Game (CDFG), in cooperation with the Sonoma Land Trust (SLT), announce that a final environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and Watershed Restoration Project is now available. The final EIR/EIS, which we prepared and now announce in accordance with the National Environmental Policy Act of 1969 (NEPA), describes the restoration of approximately 2,300 acres (ac) of former farmland located in Sonoma County, California, near the San Pablo Bay. The final EIR/EIS responds to all comments we received on the draft document. The restoration project, which would be implemented by the SLT, would restore natural estuarine ecosystems on diked baylands, while providing public access and recreational and educational opportunities compatible with ecological and cultural resources protection. The U.S. Army Corps of Engineers, San Francisco District, and the National Marine Fisheries Service of the National Oceanic and Atmospheric Administration are cooperating agencies on the final EIR/EIS.

  19. Description of the supporting factors of final project in Mathematics and Natural Sciences Faculty of Syiah Kuala University with multiple correspondence analysis

    NASA Astrophysics Data System (ADS)

    Rusyana, Asep; Nurhasanah; Maulizasari

    2018-05-01

    Syiah Kuala University (Unsyiah) is hoped to have graduates who are qualified for working or creating a field of work. A final project course implementation process must be effective. This research uses data from the evaluation conducted by Mathematics and Natural Sciences Faculty (FMIPA) of Unsyiah. Some of the factors that support the completion of the final project are duration, guidance, the final project seminars, facility, public impact, and quality. This research aims to know the factors that have a relationship with the completion of the final project and identify similarities among variables. The factors that support the completion of the final project at every study program in FMIPA are (1) duration, (2) guidance and (3) facilities. These factors are examined for the correlations by chi-square test. After that, the variables are analyzed with multiple correspondence analysis. Based on the plot of correspondence, the activities of the guidance and facilities in Informatics Study Program are included in the fair category, while the guidance and facilities in the Chemistry are included in the best category. Besides that, students in Physics can finish the final project with the fastest completion duration, while students in Pharmacy finish for the longest time.

  20. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  1. Network, system, and status software enhancements for the autonomously managed electrical power system breadboard. Volume 1: Project summary

    NASA Technical Reports Server (NTRS)

    Mckee, James W.

    1990-01-01

    This volume (1 of 4) gives a summary of the original AMPS software system configuration, points out some of the problem areas in the original software design that this project is to address, and in the appendix collects all the bimonthly status reports. The purpose of AMPS is to provide a self reliant system to control the generation and distribution of power in the space station. The software in the AMPS breadboard can be divided into three levels: the operating environment software, the protocol software, and the station specific software. This project deals only with the operating environment software and the protocol software. The present station specific software will not change except as necessary to conform to new data formats.

  2. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... on Sunrise Project, I-205 to Rock Creek Junction: Clackamas County, OR AGENCY: Federal Highway.... 139(l)(1). The actions relate to a proposed highway project, Sunrise Project, I-205 to Rock Creek... Project, I-205 to Rock Creek Junction Final Environmental Impact Statement, Record of Decision and other...

  3. Final Report for NIREC Renewable Energy Research & Development Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borland, Walt

    This report is a compilation of progress reports and presentations submitted by NIREC to the DOE’s Solar Energy Technologies Office for award number DE-FG36-08GO88161. This compilation has been uploaded to OSTI by DOE as a substitute for the required Final Technical Report, which was not submitted to DOE by NIREC or received by DOE. Project Objective: The primary goal of NIREC is to advance the transformation of the scientific innovation of the institutional partner’s research in renewable energy into a proof of the scientific concept eventually leading to viable businesses with cost effective solutions to accelerate the widespread adoption ofmore » renewable energy. NIREC will a) select research projects that are determined to have significant commercialization potential as a result of vetting by the Technology and commercialization Advisory Board, b) assign an experienced Entrepreneur-in-Residence (EIR) to each manage the scientific commercialization-preparedness process, and c) facilitate connectivity with venture capital and other private-sector capital sources to fund the rollout, scaling and growth of the resultant renewable energy business.« less

  4. EXECUTIVE SUMMARY OF STATE DATA RELATED TO ABANDONED CENTRALIZED AND COMMERCIAL DRILLING-FLUID DISPOSAL SITES IN LOUISIANA, NEW MEXICO, OKLAHOMA, AND TEXAS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    H. Seay Nance

    2003-03-01

    This 2003 Spring Semi-Annual Report contains a summary of the Final Technical Report being prepared for the Soil Remediation Requirements at Commercial and Centralized Drilling-Fluid Disposal (CCDD) Sites project funded by the United States Department of Energy under DOE Award No. DE-AC26-99BC15225. The summary describes (1) the objectives of the investigation, (2) a rationale and methodology of the investigation, (3) sources of data, assessment of data quality, and data availability, (4) examples of well documented centralized and commercial drilling-fluid disposal (CCDD) sites and other sites where drilling fluid was disposed of, and (5) examples of abandoned sites and measures undertakenmore » for their assessment and remediation. The report also includes most of the figures, tables, and appendices that will be included in the final report.« less

  5. Career Development Project. [Ogden, Utah City School District]. Final Report and Evaluation.

    ERIC Educational Resources Information Center

    Drechsel, Lionel

    Covering the time period of October 1972 to May 1974, the final report documents the efforts of a career education project in the Ogden City School District. In the elementary grades the program stressed the importance of work and workers and introduced some very basic careers. On the junior and senior high school levels, a career guidance and…

  6. 34. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, H.L. Handley, Assistant Highway Engineer, March 30, 1935. NOTE HOW THE LOCATION FITS THE CONTOUR OF THE HILL. LOOKING FROM STATION 382+00 ON HALEAKALA HIGHWAY. - Haleakala National Park Roads, Pukalani, Maui County, HI

  7. Agile Machining and Inspection Non-Nuclear Report (NNR) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lazarus, Lloyd

    This report is a high level summary of the eight major projects funded by the Agile Machining and Inspection Non-Nuclear Readiness (NNR) project (FY06.0422.3.04.R1). The largest project of the group is the Rapid Response project in which the six major sub categories are summarized. This project focused on the operations of the machining departments that will comprise Special Applications Machining (SAM) in the Kansas City Responsive Infrastructure Manufacturing & Sourcing (KCRIMS) project. This project was aimed at upgrading older machine tools, developing new inspection tools, eliminating Classified Removable Electronic Media (CREM) in the handling of classified Numerical Control (NC) programsmore » by installing the CRONOS network, and developing methods to automatically load Coordinated-Measuring Machine (CMM) inspection data into bomb books and product score cards. Finally, the project personnel leaned perations of some of the machine tool cells, and now have the model to continue this activity.« less

  8. Electronic construction collaboration system -- final phase : [tech transfer summary].

    DOT National Transportation Integrated Search

    2014-07-01

    Construction projects have been growing more complex in terms of : project team composition, design aspects, and construction processes. : To help manage the shop/working drawings and requests for information : (RFIs) for its large, complex projects,...

  9. Aerobic Excercise and Research Opportunities to Benefit Impaired Children. (Project AEROBIC). Final Report.

    ERIC Educational Resources Information Center

    Idaho Univ., Moscow.

    The final report summarizes accomplishments of Project AEROBIC (Aerobic Exercise and Research Opportunities to Benefit Impaired Children), which provided a physical education exercise program for severely, profoundly, and multiply handicapped children aged 10-21. Activities are outlined for the 3 year period and include modification of exercise…

  10. User Guide for State Summaries

    EPA Pesticide Factsheets

    The EPA developed state-level summaries of chemical and water use using the project database developed from FracFocus 1.0 disclosures with some limited background information on oil and gas production, geology, and regulations for the state.

  11. Project S.P.I.C.E.: Special Partnership in Career Education. Final Report.

    ERIC Educational Resources Information Center

    Emerson, Debby H.; And Others

    The final report discusses Project SPICE (Special Partnership in Career Education) which produced a career awareness curriculum consisting of an implementation guide, and six teaching modules intended for use with educable mentally handicapped students (ages 11-to-13 years). Noted are the following program objectives (based on the National…

  12. Summary of Prometheus Radiation Shielding Nuclear Design Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. Stephens

    2006-01-13

    This report transmits a summary of radiation shielding nuclear design studies performed to support the Prometheus project. Together, the enclosures and references associated with this document describe NRPCT (KAPL & Bettis) shielding nuclear design analyses done for the project.

  13. Development of a Secondary School Physics Program: Harvard Project Physics. Volume 2, More Appendices. Final Report.

    ERIC Educational Resources Information Center

    Holton, Gerald; And Others

    As appendices to the final report on Project Physics (SE 015 500), this volume includes parts of the original documents concerning the project development. Articles published in the "Physics Teacher" are included in reprint form. Evaluation and research papers along with related materials issued in other publications are grouped into…

  14. Summaries of FY 1993 Engineering Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    This report documents the BES Engineering Research Program for fiscal year 1993; it provides a summary for each of the program projects in addition to a brief program overview. The report is intended to provide staff of Congressional committees, other executive departments, and other DOE offices with substantive program information so as to facilitate governmental overview and coordination of Federal research programs. Of equal importance, its availability facilitates communication of program information to interested research engineers and scientists. The organizational chart for the DOE Office of Energy Research (OER) on the next page delineates the six Divisions within the OERmore » Office of Basic Energy Sciences (BES). Each BES Division administers basic, mission oriented research programs in the area indicated by its title. The BES Engineering Research Program is one such program; it is administered by the Engineering and Geosciences Division of BES. In preparing this report we asked the principal investigators to submit summaries for their projects that were specifically applicable to fiscal year 1993. The summaries received have been edited if necessary.« less

  15. A Process Evaluation of Project Developmental Continuity: Final Report of the PDC Feasibility Study, 1974-1977.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This is the final report of the 3-year feasibility phase of a projected 7-year longitudinal evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Chapter I gives an overview of the PDC program…

  16. 77 FR 40601 - Final Priority: Disability and Rehabilitation Research Projects and Centers Program; Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... analyses of data, producing observational findings, and creating other sources of research-based... provide a rationale for the stage of research being proposed and the research methods associated with the... DEPARTMENT OF EDUCATION Final Priority: Disability and Rehabilitation Research Projects and...

  17. 77 FR 5566 - Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ...] Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County, New Mexico... Statement (Final EIS) for the HB In-Situ Solution Mine Project, and by this notice is announcing its... the Federal Register. ADDRESSES: Copies of the HB In-Situ Solution Mining EIS are available for public...

  18. TX-100 manufacturing final project report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashwill, Thomas D.; Berry, Derek S.

    This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. Themore » molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the

  19. The Physical Fitness of Adolescents with Cerebral Palsy. Project UNIQUE II. Final Report.

    ERIC Educational Resources Information Center

    Winnick, Joseph P.; Short, Francis X.

    The final report describes a 2-year project of the State University of New York, College at Brockport, to study the physical fitness of nonretarded and retarded adolescents with cerebral palsy. The UNIQUE Physical Fitness Test was administered to 203 cerebral palsied adolescents throughout the United States and from segregated and nonsegregated…

  20. NCMS PWB Surface Finishes Team project summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kokas, J.; DeSantis, C.; Wenger, G.

    1996-04-01

    The NCMS PWB Surface Finishes Consortium is just about at the end of the five year program. Dozens of projects related to surface finishes and PWB solder-ability were performed by the team throughout the program, and many of them are listed in this paper. They are listed with a cross reference to where and when a technical paper was presented describing the results of the research. However, due to time and space constraints, this paper can summarize the details of only three of the major research projects accomplished by the team. The first project described is an ``Evaluation of PWBmore » Surface Finishes.`` It describes the solderability, reliability, and wire bondability of numerous surface finishes. The second project outlined is an ``Evaluation of PWB Solderability Test Methods.`` The third project outlined is the ``Development and Evaluation of Organic Solderability Preservatives.``« less

  1. Project TIME. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Schroyer, Connie J.; Payne, David L.

    Project TIME (Training Initiative for Manufacturing Employees) was an 18-month National Workplace Literacy Program conducted by Lord Fairfax Community College in conjunction with an automotive parts plant and Triplett Technical and Business Institute in Virginia. Project TIME had three primary objectives: to help employees obtain the basic…

  2. Comprehensive Evaluation Project. Final Report.

    ERIC Educational Resources Information Center

    1969

    This project sought to develop a set of tests for the assessment of the basic literacy and occupational cognizance of pupils in those public elementary and secondary schools, including vocational schools, receiving services through Federally supported educational programs and projects. The assessment is to produce generalizable average scores for…

  3. Final Project Report, DynAX Innovations in Programming Models, Compilers and Runtime Systems for Dynamic Adaptive Event Driven Execution Models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gao, Guang; Meister, Benoit; Padua, David

    2015-12-31

    This report contains a summary of the work done for the Dynax Project from 9/1/2012 to 8/31/2015. Much of the information presented is discussed in further detail in other STI annual and quarterly reports. Additionally, a NCE report was submitted covering work done from the period of 9/1/2015 to 12/31/2015.

  4. Final PSD Permit Extension Letter - Energy Answers Arecibo, LLC/Energy Answers Arecibo Puerto Rico Renewable Energy Project, PR

    EPA Pesticide Factsheets

    This page contains the Final PSD Permit Extension Letter for Energy Answers Arecibo Puerto Rico Renewable Energy Project, issued on April 10, 2017 and the EPA Public Announcement for Final PSD Permit Extension for Energy Answers Arecibo, PR.

  5. Vision Hampton Roads : public responsiveness summary.

    DOT National Transportation Integrated Search

    2010-02-23

    All comments submitted to Vision Hampton Roads were reviewed prior to addition to the final : document. Using this Public Responsiveness Summary, citizens will be able to see and track how : their engagement has impacted results. On the following pag...

  6. Manufacturing Methods and Technology (MMT) project execution report

    NASA Astrophysics Data System (ADS)

    Swim, P. A.

    1982-10-01

    This document is a summary compilation of the manufacturing methods and technology program project status reports (RCS DRCMT-301) submitted to IBEA from DARCOM major Army subcommands and project managers. Each page of the computerized section lists project number, title, status, funding, and projected completion date. Summary pages give information relating to the overall DARCOM program.

  7. Parent Attitudes Toward the Virginia Beach Year-Round School Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Schlechty, Phillip C.

    Part of the Virginia Beach year-round school program evaluation, this final report contains a detailed analysis of parental attitudes, beliefs, and perceptions. The data leads to the following conclusions: a majority (53.3 percent) of parents are dubious or negative toward the 45-15 pilot project; a slight majority of parents in the pilot schools…

  8. Career Awareness Program for Bilingual Haitian and Hispanic Students (Project CAP). Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    Roman, Elliott M.

    In 1993-94 the Career Awareness Program for Bilingual Haitian and Hispanic Students (Project CAP) was in its fifth and final year as an Elementary and Secondary Education Act Title VII project. Project CAP operated at two high schools in Brooklyn (New York), serving 136 Haitians at one and an undetermined number of Spanish-speaking and Haitian…

  9. 17 CFR 8.20 - Final decision.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Final decision. 8.20 Section 8.20 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION EXCHANGE PROCEDURES FOR DISCIPLINARY, SUMMARY, AND MEMBERSHIP DENIAL ACTIONS Disciplinary Procedure § 8.20 Final decision. Each...

  10. 78 FR 57066 - Final Waivers and Extensions of Project Periods; American Indian Vocational Rehabilitation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ...) Number: 84.250C and 84.250D] Final Waivers and Extensions of Project Periods; American Indian Vocational... assistance in order to provide vocational rehabilitation services to American Indians with disabilities... program is funded through a set-aside of the funds appropriated for the Vocational Rehabilitation (VR...

  11. Advanced Gas Turbine (AGT) technology development project

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This report is the final in a series of Technical Summary Reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorizrd under NASA Contract DEN3-167 and sponsored by the DOE. The project was administered by NASA-Lewis Research Center of Cleveland, Ohio. Plans and progress are summarized for the period October 1979 through June 1987. This program aims to provide the US automotive industry the high risk, long range technology necessary to produce gas turbine engines for automobiles that will reduce fuel consumption and reduce environmental impact. The intent is that this technology will reach the marketplace by the 1990s. The Garrett/Ford automotive AGT was designated AGT101. The AGT101 is a 74.5 kW (100 shp) engine, capable of speeds to 100,000 rpm, and operates at turbine inlet temperatures to 1370 C (2500 F) with a specific fuel consumption level of 0.18 kg/kW-hr (0.3 lbs/hp-hr) over most of the operating range. This final report summarizes the powertrain design, power section development and component/ceramic technology development.

  12. Tidd hot gas clean up program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Final Report on the Tidd Hot Gas Clean Up Program covers the period from initial Proof-of-Concept testing in August, 1990, through final equipment inspections in May, 1995. The Tidd Hot Gas Clean Up (HGCU) system was installed in the Tidd Pressurized Fluidized Bed Combustion (PFBC) Demonstration Plant, which is the first utility-scale PFBC plant in the United States. Detailed design work on the project began in July, 1990, and site construction began in December, 1991. Initial operation of the system occurred in May, 1992, and the hot gas filter was commissioned in October, 1992. The test program ended inmore » March, 1995, when the Tidd Plant was shut down following its four-year test program. Section 1.0 of this report is an executive summary of the project covering the project background, system description, test results and conclusions. Section 2.0 is an introduction covering the program objectives and schedule. Section 3.0 provides detailed descriptions of the system and its major components. Section 4.0 provides detailed results of all testing including observations and posttest inspection results. Sections 5.0 and 6.0 list the program conclusions and recommendations, respectively. Appendix I is a report prepared by Southern Research Institute on the properties of Tidd PFBC ash sampled during the test program. Appendix II is a report prepared by Westinghouse STC on the performance of candle filter fail-safe regenerator devices.« less

  13. Oregon Green Light CVO evaluation : final report : executive summary

    DOT National Transportation Integrated Search

    2001-04-01

    This report summarizes the findings of all of the Detailed Test Plans conducted for the evaluation of the Oregon Green Light Commercial Vehicle Operations (CVO) project. This project was responsible for the installation of 21 systems containing weigh...

  14. Executive summary and guide to final report: Advisory committee on human radiation experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-01-01

    On January 15, 1994, President Clinton appointed the Advisory Committee on Human Radiation Experiments to investigate reports of possibly unethical experiments funded by the government decades ago. The Committee was directed to uncover the history of human radiation experiments during the period 1944 through 1974 and to examine cases in which the government had intentionally released radiation into the environment for research purposes. The Committee was further charged with identifying the ethical and scientific standards for evaluating these events, and with making recommendations to ensure that whatever wrongdoing may have ocurred in the past cannot be repeated. The Committee undertookmore » three projects: A review of how each agency of the federal government that currently conducts or funds research involving human subjects regulates this activity or oversees it; An examination of the documents and consent forms of research projects that are today sponsored by the federal government in order to develop insight into the current status of protections for the rights and interests of human subjects; and, Interviews of nearly 1,900 patients receiving out-patient medical care in private hospitals and federal facilities throughout the country. This booklet provides an overview of the Final Report, summarizing each chapter.« less

  15. UCSD Performance in the Edge Plasma Simulation (EPSI) Project. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tynan, George Robert

    This report contains a final report on the activities of UC San Diego PI G.R. Tynan and his collaborators as part of the EPSI Project, that was led by Dr. C.S. Chang, from PPPL. As a part of our work, we carried out several experiments on the ALCATOR C-­MOD tokamak device, aimed at unraveling the “trigger” or cause of the spontaneous transition from low-­mode confinement (L-­mode) to high confinement (H-­mode) that is universally observed in tokamak devices, and is planned for use in ITER.

  16. FY06 LDRD Final Report: Broadband Radiation and Scattering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Madsen, N; Fasenfest, B; White, D

    2007-03-08

    This is the final report for LDRD 01-ERD-005. The Principle Investigator was Robert Sharpe. Collaborators included Niel Madsen, Benjamin Fasenfest, John D. Rockway, of the Defense Sciences Engineering Division (DSED), Vikram Jandhyala and James Pingenot from the University of Washington, and Mark Stowell of the Center for Applications Development and Software Engineering (CADSE). It should be noted that Benjamin Fasenfest and Mark Stowell were partially supported under other funding. The purpose of this LDRD effort was to enhance LLNL's computational electromagnetics capability in the area of broadband radiation and scattering. For radiation and scattering problems our transient EM codes aremore » limited by the approximate Radiation Boundary Conditions (RBC's) used to model the radiation into an infinite space. Improved RBC's were researched, developed, and incorporated into the existing EMSolve finite-element code to provide a 10-100x improvement in the accuracy of the boundary conditions. Section I provides an introduction to the project and the project goals. Section II provides a summary of the project's research and accomplishments as presented in the attached papers.« less

  17. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  18. Expanding the Circle: South Dakota Deaf-Blind Project. Final Report, 10-1-98 through 9-30-99.

    ERIC Educational Resources Information Center

    South Dakota State Dept. of Education and Cultural Affairs, Pierre.

    This final report describes activities and accomplishments of the South Dakota Deaf-Blind Project, a 4-year federally funded project designed to raise awareness of the need for early identification of children who are deaf-blind and reside on Native American reservation lands. To this end, the states of Montana, Minnesota, North Dakota, Nebraska,…

  19. Harmony in Career Learning and Scholastic System (Project HI-CLASS). Final Evaluation Report 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Duque, Diana L.

    Harmony in Career Learning and Scholastic System (Project HI-CLASS) was a Transitional Bilingual Education Title VII-funded program in its fifth and final year in 1992-93. The project offered instructional and support services to 641 students of limited English proficiency (LEP) at three sites, all of which had many immigrant students, in…

  20. 78 FR 45938 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ...] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or...

  1. ULSGEN (Uplink Summary Generator)

    NASA Technical Reports Server (NTRS)

    Wang, Y.-F.; Schrock, M.; Reeve, T.; Nguyen, K.; Smith, B.

    2014-01-01

    Uplink is an important part of spacecraft operations. Ensuring the accuracy of uplink content is essential to mission success. Before commands are radiated to the spacecraft, the command and sequence must be reviewed and verified by various teams. In most cases, this process requires collecting the command data, reviewing the data during a command conference meeting, and providing physical signatures by designated members of various teams to signify approval of the data. If commands or sequences are disapproved for some reason, the whole process must be restarted. Recording data and decision history is important for traceability reasons. Given that many steps and people are involved in this process, an easily accessible software tool for managing the process is vital to reducing human error which could result in uplinking incorrect data to the spacecraft. An uplink summary generator called ULSGEN was developed to assist this uplink content approval process. ULSGEN generates a web-based summary of uplink file content and provides an online review process. Spacecraft operations personnel view this summary as a final check before actual radiation of the uplink data. .

  2. Rapid Carbon Assessment Project: Data Summary and Availability

    NASA Astrophysics Data System (ADS)

    Wills, Skye; Loecke, Terry; Roecker, Stephen; Beaudette, Dylan; Libohova, Zamir; Monger, Curtis; Lindbo, David

    2017-04-01

    The Rapid Carbon Assessment (RaCA) project was undertaken to estimate regional soil organic carbon (SOC) stocks across the conterminous United States (CONUS) as a one-time event. Sample locations were selected randomly using the NRI (National Resource Inventory) sampling framework covering all areas in CONUS with SSURGO certified maps as of Dec 2012. Within each of 17 regions, sites were selected by a combination of soil and land use/cover groups (LUGR). At each of more than 6,000 sites five pedons were described and sampled to a depth of 100cm (one central and 4 satellites 30m in each cardinal direction). There were 144,833 samples described from 32,084 pedons at 6, 017 sites. A combination of measurement and modeled bulk density was used for all samples. A visible near-infrared (VNIR) spectrophotometer was used to scan each sample for prediction of soil carbon contents. The samples of each central pedon were analyzed by the Kellogg Soil Survey Laboratory for combustion carbon and calcimeter inorganic carbon. SOC stocks were calculated for each pedon using a standard fixed depth technique to depths of 5, 30 and 100cm. Pedon SOC stocks were transformed to better approach normality before LUGR, regional and land use/cover summaries were calculated. The values reported are geometric means. A detailed spatial map can be produced using LUGR mean assignment to correlated pixels. LUGR values range from 1 to 3,000 Mg ha-1. While some artifacts are visible due to the stratified nature of sampling and extrapolation, the predictions are generally smooth and highlight some distinct geomorphic features including the sandhills in the Great Plains in the central US, mountainous regions in the West and coastal wetlands in the East. Regional averages range from 46 Mg ha-1 in the desert Southwest to 182 Mg ha-1 in the Northeast. Regional trends correlate to climate variables such as precipitation and potential evapotranspiration. While land use/cover classes vary in mean values

  3. One project`s waste is another project`s resource

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on thismore » plan. Summaries of examples are presented in tables.« less

  4. MSFC Skylab Apollo Telescope Mount summary mission report

    NASA Technical Reports Server (NTRS)

    Morse, A. R.

    1974-01-01

    A summary of the Apollo Telescope Mount (ATM) performance during the 8.5-month Skylab mission is presented. A brief description of each ATM system, system performance summaries, discussion of all significant ATM anomalies which occurred during the Skylab mission, and, in an appendix, a summary of the Skylab ATM Calibration Rocket Project (CALROC) are provided. The text is supplemented and amplified by photographs, drawings, curves, and tables. The report shows that the ATM not only met, but exceeded premission performance criteria, and that participation of man in space for this scientific investigation greatly enhanced the quality and quantity of the data attained.

  5. Pathways to Practice. A Series of Final Reports on the SREB Nursing Curriculum Project.

    ERIC Educational Resources Information Center

    Haase, Patricia T.

    Five final reports on the Nursing Curriculum Project of the Southern Regional Education Board are presented. The reports include (1) RN (Registered Nursing) Education: The Basic Issues; (2) Types of RN Programs; (3) Planning and Operating an RN Program; (4) Acclimating the Novice Nurse: Whose Responsibility? and (5) Statewide Planning for Nursing.…

  6. Q-Bridge environmental impact statement : executive summary

    DOT National Transportation Integrated Search

    1997-04-01

    This Executive Summary provides a brief overview of the Final Environmental Impact Statement/Section 4(f) Evaluation (FEIS) for Interstate 95 (I-95) - Pearl Harbor Memorial Bridge (Q-Bridge) Crossing New Haven Harbor Study. The information presented ...

  7. Summaries of research projects for fiscal years 1996 and 1997, medical applications and biophysical research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Medical Applications and Biophysical Research Division of the Office of Biological and Environmental Research supports and manages research in several distinct areas of science and technology. The projects described in this book are grouped by the main budgetary areas: General Life Sciences (structural molecular biology), Medical Applications (primarily nuclear medicine) and Measurement Science (analytical chemistry instrumentation), Environmental Management Science Program, and the Small Business Innovation Research Program. The research funded by this division complements that of the other two divisions in the Office of Biological and Environmental Research (OBER): Health Effects and Life Sciences Research, and Environmental Sciences. Mostmore » of the OBER programs are planned and administered jointly by the staff of two or all three of the divisions. This summary book provides information on research supported in these program areas during Fiscal Years 1996 and 1997.« less

  8. Cloud Compute for Global Climate Station Summaries

    NASA Astrophysics Data System (ADS)

    Baldwin, R.; May, B.; Cogbill, P.

    2017-12-01

    Global Climate Station Summaries are simple indicators of observational normals which include climatic data summarizations and frequency distributions. These typically are statistical analyses of station data over 5-, 10-, 20-, 30-year or longer time periods. The summaries are computed from the global surface hourly dataset. This dataset totaling over 500 gigabytes is comprised of 40 different types of weather observations with 20,000 stations worldwide. NCEI and the U.S. Navy developed these value added products in the form of hourly summaries from many of these observations. Enabling this compute functionality in the cloud is the focus of the project. An overview of approach and challenges associated with application transition to the cloud will be presented.

  9. Situation Update: Summary of Weekly FluView

    MedlinePlus

    ... Pandemic Other Situation Update: Summary of Weekly FluView Report Language: English (US) Español Recommend on Facebook Tweet ... Influenza Positive Tests Reported to CDC The FluView report published on May 25 marks the final full ...

  10. Summary of Research 1997, Department of Computer Science.

    DTIC Science & Technology

    1999-01-01

    Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704...contains summaries of research projects in the Department of Computer Science . A list of recent publications is also included which consists of conference...parallel programming. Recently, in a joint research project between NPS and the Russian Academy of Sciences Systems Programming Insti- tute in Moscow

  11. Current State of Dental Education: Executive Summary.

    PubMed

    Formicola, Allan J

    2017-08-01

    This executive summary for Section 1 of the "Advancing Dental Education in the 21 st Century" project provides a composite picture of information from 12 background articles on the current state of dental education in the United States. The summary includes the following topics: the current status of the dental curriculum, the implications of student debt and dental school finances, the expansion of enrollment, student diversity, pre- and postdoctoral education, safety net status of dental school clinics, and trends in faculty.

  12. Summary of flat-plate solar array project documentation: Abstracts of published documents, 1975-1986, revision 1

    NASA Technical Reports Server (NTRS)

    Phillips, M. J.

    1986-01-01

    Abstracts of final reports, or the latest quarterly or annual, of the Flat-Plate Solar Array (FSA) Project Contractor of Jet Propulsion Laboratory (JPL) in-house activities are presented. Also presented is a list of proceedings and publications, by author, of work connected with the project. The aim of the program has been to stimulate the development of technology that will enable the private sector to manufacture and widely use photovoltaic systems for the generation of electricity in residential, commercial, industrial, and Government applications at a cost per watt that is competitive with utility generated power. FSA Project activities have included the sponsoring of research and development efforts in silicon refinement processes, advanced silicon sheet growth techniques, higher efficiency solar cells, solar cell/module fabrication processes, encapsulation, module/array engineering and reliability, and economic analyses.

  13. Smart Gun Technology project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiss, D.R.

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness inmore » models of a smart firearm.« less

  14. Final Technical Report of Project DE-FG02-96ER14647

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lundeen, Stephen R.

    This is the final technical report of work completed under DOE support over the period Sept. 1, 1996 until May 31, 2015. The title of the project was "Ion/Excited Atom Collision Studies with a Rydberg Target and a CO2 Laser" from 9/1/96 to 10/31/06, and "Properties of Actinide Ions from Measurements of Rydberg Ion Fine Structure" from 11/1/06 until 5/31/15. The primary technical results were a detailed experimental study of resonant charge transfer between Rydberg atoms and highly-charged ions, and unique measurements of many properties of multiply-charged Thorium ions.

  15. Design of Training Systems Phase I Summary Report.

    ERIC Educational Resources Information Center

    Lindahl, William H.; And Others

    A summary is provided of the status of Phase I of the three-stage project, "Design of Training Systems" (DOTS). The purpose of the overall project is described as being to introduce the technologies of education, psychology, management and operations research into the management of Navy training. Phase I of the effort is designed to…

  16. Summary of Research on Education and the Rural-Urban Transformation. Final Report.

    ERIC Educational Resources Information Center

    Textor, Robert B.; And Others

    This monograph is the summary report of the "Education and the Rural-Urban Transformation" (ERUT) portion of the United States Office of Education research contract concerning "Content and Instructional Methods of Education for the Economic-Political-Social Development of Nations." The ERUT team conducted a continuing seminar throughout the…

  17. 78 FR 27 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ...-2012-0003] Final Flood Elevation Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final rule. SUMMARY: Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made... effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  18. 75 FR 78926 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ...-2010-0003] Final Flood Elevation Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final rule. SUMMARY: Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made... effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  19. 77 FR 74610 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-17

    ...-2012-0003] Final Flood Elevation Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final rule. SUMMARY: Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made... effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  20. The South Central Superpave Center Summary Report

    DOT National Transportation Integrated Search

    1999-11-01

    This is the summary report for Research Project 0-1250, The South Central Superpave Center." Initiated and sponsored by the Texas Department of Transportation and the Federal Highway Administration, the Superpave Center fostered the implementation of...

  1. Transit safety retrofit package development : final report.

    DOT National Transportation Integrated Search

    2014-07-01

    This report provides a summary of the Transit Safety Retrofit Package (TRP) Development project and its results. The report documents results of each project phase, and provides recommended next steps as well as a vision for a next generation TRP. Th...

  2. Installation summary report : GRS instrumentation I-70 over Smith Road.

    DOT National Transportation Integrated Search

    2016-07-04

    This report presents a summary of the I-70 over Smith Road GRS Instrumentation Project (the project) in Aurora, Colorado. The report summarizes the instruments used, installation means and methods, and a discussion on the web-based data interface. CD...

  3. Material for Point Design (final summary of DIME material)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, Paul A.

    2014-02-25

    These slides summarize the motivation of the Defect Induced Mix Experiment (DIME) project, the “point design” of the Polar Direct Drive (PDD) version of the NIF separated reactant capsule, the experimental requirements, technical achievements, and some useful backup material. These slides are intended to provide much basic material in one convenient location and will hopefully be of some use for subsequent experimental projects.

  4. Automated metadata--final project report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schissel, David

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO projectmore » was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project’s toolkit. Feedback was very positive on the project’s toolkit and the value of such automatic workflow documentation to the scientific endeavor.« less

  5. The Southern Forest Futures Project: summary report

    Treesearch

    David N. Wear; John G. Greis

    2012-01-01

    The Southern Forest Futures Project provides a science-based “futuring” analysis of the forests of the 13 States of the Southeastern United States. With findings organized in a set of scenarios and using a combination of computer models and science synthesis, the authors of the Southern Forest Futures Project examine a variety of possible futures that could shape...

  6. Title I ESEA Projects: Digest of Annual Evaluations. Supplementary Edition 1977-1978. A historical summary, by the Department of Federal Evaluation Resources, of the key findings reported in the annual evaluations of each project. Report #7827.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    This supplement provides a historical summary, for the Philadelphia, Pennsylvania schools, of the key findings in the Annual Evaluations of each Elementary Secondary Education Act Title I project since 1975. The 1977-1978 management information, the key findings for 1975-1976 and 1976-1977, as well as the preliminary findings for 1977-1978 are…

  7. 10 CFR 950.32 - Final determination on covered events.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Final determination on covered events. 950.32 Section 950... Process § 950.32 Final determination on covered events. (a) If the parties reach a Final Determination on Covered Events through mediation, or Summary Binding Decision as set forth in this subpart, the Final...

  8. 10 CFR 950.32 - Final determination on covered events.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Final determination on covered events. 950.32 Section 950... Process § 950.32 Final determination on covered events. (a) If the parties reach a Final Determination on Covered Events through mediation, or Summary Binding Decision as set forth in this subpart, the Final...

  9. 10 CFR 950.32 - Final determination on covered events.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Final determination on covered events. 950.32 Section 950... Process § 950.32 Final determination on covered events. (a) If the parties reach a Final Determination on Covered Events through mediation, or Summary Binding Decision as set forth in this subpart, the Final...

  10. 10 CFR 950.32 - Final determination on covered events.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Final determination on covered events. 950.32 Section 950... Process § 950.32 Final determination on covered events. (a) If the parties reach a Final Determination on Covered Events through mediation, or Summary Binding Decision as set forth in this subpart, the Final...

  11. 10 CFR 950.32 - Final determination on covered events.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Final determination on covered events. 950.32 Section 950... Process § 950.32 Final determination on covered events. (a) If the parties reach a Final Determination on Covered Events through mediation, or Summary Binding Decision as set forth in this subpart, the Final...

  12. Interactive Peer Coaching/Mentoring Project for Preparing Teachers of Students with Severe Behavioral Disorders Final Report. Volume 1: Project Narrative and Briefing Papers [and] Volume 2: Appendices.

    ERIC Educational Resources Information Center

    North Dakota Center for Persons with Disabilities, Minot.

    This final report discusses the activities and outcomes of the Interactive Peer Coaching/Mentoring (IPCM) Project, a program designed to prepare teachers of students with severe behavioral disorders (SED) residing in a rural, remote area in North Dakota. The IPCM project was conducted from July 1997 through July 2000 and developed an…

  13. The Pilot Lunar Geologic Mapping Project: Summary Results and Recommendations from the Copernicus Quadrangle

    NASA Technical Reports Server (NTRS)

    Skinner, J. A., Jr.; Gaddis, L. R.; Hagerty, J. J.

    2010-01-01

    The first systematic lunar geologic maps were completed at 1:1M scale for the lunar near side during the 1960s using telescopic and Lunar Orbiter (LO) photographs [1-3]. The program under which these maps were completed established precedents for map base, scale, projection, and boundaries in order to avoid widely discrepant products. A variety of geologic maps were subsequently produced for various purposes, including 1:5M scale global maps [4-9] and large scale maps of high scientific interest (including the Apollo landing sites) [10]. Since that time, lunar science has benefitted from an abundance of surface information, including high resolution images and diverse compositional data sets, which have yielded a host of topical planetary investigations. The existing suite of lunar geologic maps and topical studies provide exceptional context in which to unravel the geologic history of the Moon. However, there has been no systematic approach to lunar geologic mapping since the flight of post-Apollo scientific orbiters. Geologic maps provide a spatial and temporal framework wherein observations can be reliably benchmarked and compared. As such, a lack of a systematic mapping program means that modern (post- Apollo) data sets, their scientific ramifications, and the lunar scientists who investigate these data, are all marginalized in regard to geologic mapping. Marginalization weakens the overall understanding of the geologic evolution of the Moon and unnecessarily partitions lunar research. To bridge these deficiencies, we began a pilot geologic mapping project in 2005 as a means to assess the interest, relevance, and technical methods required for a renewed lunar geologic mapping program [11]. Herein, we provide a summary of the pilot geologic mapping project, which focused on the geologic materials and stratigraphic relationships within the Copernicus quadrangle (0-30degN, 0-45degW).

  14. Descriptions and Abstracts of Regular Education Inservice Projects (REGI).

    ERIC Educational Resources Information Center

    Erwin, Barbara, Comp.; And Others

    This description of the Regular Education Inservice (REGI) effort in fiscal year 1981 includes a summary analysis of data from the REGI projects and a state by state compilation of project abstracts. Following the summary analysis of the REGI effort, project abstracts are organized by state or territory. Within each state or territory section,…

  15. Torrejon AB, Madrid, Spain. revised uniform summary of surface weather observations (RUSSWO). parts a-f. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-10-03

    This report is a six-part statistical summary of surface weather observations for Torrejon AB, Madrid Spain. It contains the following parts: (A) Weather Conditions; Atmospheric Phenomena; (B) Precipitation, Snowfall and Snow Depth (daily amounts and extreme values); (C) Surface winds; (D) Ceiling Versus Visibility; Sky Cover; (E) Psychrometric Summaries (daily maximum and minimum temperatures, extreme maximum and minimum temperatures, psychrometric summary of wet-bulb temperature depression versus dry-bulb temperature, means and standard deviations of dry-bulb, wet-bulb and dew-point temperatures and relative humidity); and (F) Pressure Summary (means, standard, deviations, and observation counts of station pressure and sea-level pressure). Data in thismore » report are presented in tabular form, in most cases in percentage frequency of occurrence or cumulative percentage frequency of occurrence tables.« less

  16. Energy Engineering Analysis (EEA) program for Lone Star Army Ammunition Plant, Texas. Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The objective of this Energy Engineering Analysis (EEA) for LSAAP is threefold: Develop a systematic plan of projects which will result in reducing energy consumption. Consider renewable energy sources with the objective of establishing an orderly procedure for reducing use of non-renewable energy sources. Determine the feasibility of Total Energy (TE), Selective Energy (SE), and Central Heating Plant (CHP) concepts using alternative fuels. In essence, an assessment of the entire energy picture at LSAAP was undertaken. This report is a summary of that effort. LSAAP was originally built during 1941 and 1942 as a shell loading plant for the Army.more » After World War II, the facility was deactivated until 1951 when it was reactivated as a Government Owned, Contractor Operated (GOCO) facility. Day and Zimmerman was selected as the operator in 1951 and has been the operating contractor ever since. Located just west of Texarkana, Texas, LSAAP encompasses an area of approximately 15,546 acres. The primary mission of LSAAP is to load, assemble and pack ammunition and ammunition components for the Army.« less

  17. 78 FR 9054 - Issuance of Final Guidance Publication

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-07

    ... NIOSH-144] Issuance of Final Guidance Publication AGENCY: National Institute for Occupational Safety and... Services (HHS). ACTION: Notice of issuance of final guidance publication. SUMMARY: The National Institute...), announces the availability of the following publication: ``NIOSH Criteria for a Recommended Standard...

  18. 76 FR 8753 - Final Information Quality Guidelines Policy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... DEPARTMENT OF HOMELAND SECURITY Final Information Quality Guidelines Policy AGENCY: Department of Homeland Security. ACTION: Notice and request for public comment on Final Information Quality Guidelines. SUMMARY: These guidelines should be used to ensure and maximize the quality of disseminated information...

  19. Final Status Survey for the Largest Decommissioning Project on Earth

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dubiel, R.W.; Miller, J.; Quayle, D.

    2006-07-01

    To assist the United States Department of Energy's (US DOE's) re-industrialization efforts at its gaseous diffusion site in Oak Ridge, Tennessee, known as the East Tennessee Technology Park (ETTP), the US DOE awarded a 6-year Decontamination and Decommissioning (D and D) contract to BNG America (formerly BNFL Inc.) in 1997. The ETTP 3-Building D and D Project included the removal and disposition of the materials and equipment from the K-33, K-31, and K-29 Gaseous Diffusion Plant buildings. The three buildings comprise more than 4.8 million square feet (446,000 square meters) of floor surface area and more than 350 million poundsmore » (148 million kilograms) of hazardous and radioactively contaminated material, making it the largest nuclear D and D project in progress anywhere in the world. The logistical hurdles involved in a project of this scope and magnitude required an extensive amount of Engineering and Health Physics professionals. In order to accomplish the Final Status Survey (FSS) for a project of this scope, the speed and efficiency of automated survey equipment was essential. Surveys of floors, structural steel and ceilings up to 60 feet (18 meters) were required. The FSS had to be expanded to include additional remediation and surveys due to characterization surveys and assumptions regarding the nature and extent of contamination provided by the US DOE. Survey design and technical bases had to consider highly variable constituents; including uranium from depleted to low enrichment, variable levels of Technetium-99 and transuranic nuclides, which were introduced into the cascade during the 1960's when recycled uranium (RU) from Savannah River was re-enriched at the facility. The RU was transported to unexpected locations from leaks in the cascade by complex building ventilation patterns. The primary survey tool used for the post remediation and FSS was the Surface Contamination Monitor (SCM) and the associated Survey Information Management System

  20. Child Welfare Research; Summaries of Research Conducted at the Child Welfare League of America.

    ERIC Educational Resources Information Center

    Child Welfare League of America, Inc., New York, NY.

    These summaries of research relating to child welfare are intended to give sufficient information about the objectives, methods, and findings of each research project to enable the reader to judge whether the full report would be of interest. Bibliographical references are included with each summary. Summaries encompass the areas of adoption…

  1. Final project report for NEET pulsed ion beam project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kucheyev, S. O.

    The major goal of this project was to develop and demonstrate a novel experimental approach to access the dynamic regime of radiation damage formation in nuclear materials. In particular, the project exploited a pulsed-ion-beam method in order to gain insight into defect interaction dynamics by measuring effective defect interaction time constants and defect diffusion lengths. This project had the following four major objectives: (i) the demonstration of the pulsed ion beam method for a prototypical nuclear ceramic material, SiC; (ii) the evaluation of the robustness of the pulsed beam method from studies of defect generation rate effects; (iii) the measurementmore » of the temperature dependence of defect dynamics and thermally activated defect-interaction processes by pulsed ion beam techniques; and (iv) the demonstration of alternative characterization techniques to study defect dynamics. As we describe below, all these objectives have been met.« less

  2. 78 FR 29760 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-21

    ... accordance with section 110 of the Flood Disaster Protection Act of 1973, 42 U.S.C. 4104, and 44 CFR part 67...] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood...

  3. Evaluation of Project Symbiosis: An Interdisciplinary Science Education Project.

    ERIC Educational Resources Information Center

    Altschuld, James W.

    1993-01-01

    The goal of this report is to provide a summary of the evaluation of Project Symbiosis which focused on enhancing the teaching of science principles in high school agriculture courses. The project initially involved 15 teams of science and agriculture teachers and was characterized by an extensive evaluation component consisting of six formal…

  4. Amyris, Inc. Integrated Biorefinery Project Summary Final Report - Public Version

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gray, David; Sato, Suzanne; Garcia, Fernando

    The Amyris pilot-scale Integrated Biorefinery (IBR) leveraged Amyris synthetic biology and process technology experience to upgrade Amyris’s existing Emeryville, California pilot plant and fermentation labs to enable development of US-based production capabilities for renewable diesel fuel and alternative chemical products. These products were derived semi-synthetically from high-impact biomass feedstocks via microbial fermentation to the 15-carbon intermediate farnesene, with subsequent chemical finishing to farnesane. The Amyris IBR team tested and provided methods for production of diesel and alternative chemical products from sweet sorghum, and other high-impact lignocellulosic feedstocks, at pilot scale. This enabled robust techno-economic analysis (TEA), regulatory approvals, and amore » basis for full-scale manufacturing processes and facility design.« less

  5. Hispanic Vocational Exploration Project. Final Report.

    ERIC Educational Resources Information Center

    Centro De La Comunidad, Inc., New London, CT.

    During its second year, the Hispanic Vocational Exploration Project recruited eighth and ninth grade Hispanic youth for a four-week cycle, after-school, career exploratory program at Southeastern Regional Vocational Technical School, Groton, Connecticut. A series of career education workshops was the other major project activity. Supportive…

  6. FNS Research Corner: Summary of Research

    ERIC Educational Resources Information Center

    Gola, Alice Ann H.; Burdg, Jinee

    2018-01-01

    The FNS Research Corner provides a continuing series to summarize recently completed and current research conducted by the U.S. Department of Agriculture's Food and Nutrition Service (FNS) in the area of child nutrition. Summaries of recently completed research projects and in-progress research are provided in this article.

  7. The Human Genome Diversity (HGD) Project. Summary document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1993-12-31

    In 1991 a group of human geneticists and molecular biologists proposed to the scientific community that a world wide survey be undertaken of variation in the human genome. To aid their considerations, the committee therefore decided to hold a small series of international workshops to explore the major scientific issues involved. The intention was to define a framework for the project which could provide a basis for much wider and more detailed discussion and planning--it was recognized that the successful implementation of the proposed project, which has come to be known as the Human Genome Diversity (HGD) Project, would notmore » only involve scientists but also various national and international non-scientific groups all of which should contribute to the project`s development. The international HGD workshop held in Sardinia in September 1993 was the last in the initial series of planning workshops. As such it not only explored new ground but also pulled together into a more coherent form much of the formal and informal discussion that had taken place in the preceding two years. This report presents the deliberations of the Sardinia workshop within a consideration of the overall development of the HGD Project to date.« less

  8. Technical assistance for law-enforcement communications: Grant summary

    NASA Technical Reports Server (NTRS)

    Reilly, N. B.

    1979-01-01

    A summary overview of project activities and results are presented. The goals and objectives are reviewed and a description of the approaches used to attain them is given. The feedback received from the seminars conducted as part of the project, and results from a questionnaire about the project are included. Significant findings of the project in such areas as radio channel loading, dispatch system design, training and technology transfer are discussed. Several specific problem areas are identified and evaluated. Specific recommendations for future technical assistance efforts are presented along with an inventory of technical-assistance reports generated throughout the project.

  9. ADD Special Projects Grant. Final Report.

    ERIC Educational Resources Information Center

    Wortham, Jocelyn F.

    The purpose of this five-year project was to prepare administrators, general and special education teachers, and parents to meet the needs of children with attention deficit hyperactivity disorders (ADHD). The project developed five self-instructional ADHD inservice preparation manuals for national and state dissemination and implemented an ADHD…

  10. Credit. 1991-92 NCCE/AT&T Projects. Consumer Education Programs.

    ERIC Educational Resources Information Center

    Eastern Michigan Univ., Ypsilanti. National Inst. for Consumer Education.

    Summaries are provided of 37 projects that address the credit education and information needs of consumers. The projects are supported by AT&T Universal Card Services Corp. through a fund managed by the National Coalition for Consumer Education. Each summary provides a project description, grant recipient, and address/telephone number. The…

  11. 76 FR 22106 - Issuance of Final Guidance Publication

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... NIOSH-033] Issuance of Final Guidance Publication AGENCY: National Institute for Occupational Safety and... Health and Human Services (HHS). ACTION: Notice of issuance of final guidance publication. SUMMARY: The... (CDC) announces the availability of the following publication: NIOSH Current Intelligence Bulletin 63...

  12. Special Education Teacher Computer Literacy Training. Project STEEL. A Special Project To Develop and Implement a Computer-Based Special Teacher Education and Evaluation Laboratory. Volume II. Final Report.

    ERIC Educational Resources Information Center

    Frick, Theodore W.; And Others

    The document is part of the final report on Project STEEL (Special Teacher Education and Evaluation Laboratory) intended to extend the utilization of technology in the training of preservice special education teachers. This volume focuses on the second of four project objectives, the development of a special education teacher computer literacy…

  13. Multilevel Evaluation Systems Project. Final Report.

    ERIC Educational Resources Information Center

    Herman, Joan L.

    Several studies were conducted in 1987 by the Multilevel Evaluation Systems Project, which focuses on developing a model for a multi-purpose, multi-user evaluation system to facilitate educational decision making and evaluation. The project model emphasizes on-going integrated assessment of individuals, classes, and programs using a variety of…

  14. PROJECT PATS: "Potentially Academically Talented Students." Final Technical Report, 10/1/80-6/30/82.

    ERIC Educational Resources Information Center

    Pfeffer, J. S.; And Others

    The final report describes a 2-year pilot project to identify and program for disadvantaged potentially gifted students in grades 5-8. Two goals of the program are stated: (1) to establish a working partnership among public and nonpublic schools and higher education; and (2) to integrate disadvantaged potentially gifted with nondisadvantaged…

  15. Key outcomes and addressing remaining challenges--perspectives from a final evaluation of the China GAVI project.

    PubMed

    Yang, Weizhong; Liang, Xiaofeng; Cui, Fuqiang; Li, Li; Hadler, Stephen C; Hutin, Yvan J; Kane, Mark; Wang, Yu

    2013-12-27

    During the China GAVI project, implemented between 2002 and 2010, more than 25 million children received hepatitis B vaccine with the support of project, and the vaccine proved to be safe and effective. With careful consideration for project savings, China and GAVI continually adjusted the budget, additionally allowing the project to spend operational funds to support demonstration projects to improve timely birth dose (TBD), conduct training of EPI staff, and to monitor the project impact. Results from the final evaluation indicated the achievement of key outcomes. As a result of government co-investment, human resources at county level engaged in hepatitis B vaccination increased from 29 per county on average in 2002 to 66 in 2009. All project counties funded by the GAVI project use auto-disable syringes for hepatitis B vaccination and other vaccines. Surveyed hepatitis B vaccine coverage increased from 71% in 2002 to 93% in 2009 among infants. The HBsAg prevalence declined from 9.67% in 1992 to 0.96% in 2006 among children under 5 years of age. However, several important issues remain: (1) China still accounts for the largest annual number of perinatal HBV infections (estimated 84,121) in the WHO WPR region; (2) China still lacks a clear national policy for safe injection of vaccines; (3) vaccination of high risk adults and protection of health care workers are still not implemented; (4) hepatitis B surveillance needs to be refined to more accurately monitor acute hepatitis B; and (5) a program for treatment of persons with chronic HBV infection is needed. Recommendations for future hepatitis B control include: using the lessons learned from the China GAVI project for future introductions of new vaccines; addressing unmet needs with a second generation hepatitis B program to reach every infant, including screening mothers, and providing HBIG for infants born to HBsAg positive mothers; expanding vaccination to high risk adults; addressing remaining unsafe

  16. Key Frame Extraction in the Summary Space.

    PubMed

    Li, Xuelong; Zhao, Bin; Lu, Xiaoqiang; Xuelong Li; Bin Zhao; Xiaoqiang Lu; Lu, Xiaoqiang; Li, Xuelong; Zhao, Bin

    2018-06-01

    Key frame extraction is an efficient way to create the video summary which helps users obtain a quick comprehension of the video content. Generally, the key frames should be representative of the video content, meanwhile, diverse to reduce the redundancy. Based on the assumption that the video data are near a subspace of a high-dimensional space, a new approach, named as key frame extraction in the summary space, is proposed for key frame extraction in this paper. The proposed approach aims to find the representative frames of the video and filter out similar frames from the representative frame set. First of all, the video data are mapped to a high-dimensional space, named as summary space. Then, a new representation is learned for each frame by analyzing the intrinsic structure of the summary space. Specifically, the learned representation can reflect the representativeness of the frame, and is utilized to select representative frames. Next, the perceptual hash algorithm is employed to measure the similarity of representative frames. As a result, the key frame set is obtained after filtering out similar frames from the representative frame set. Finally, the video summary is constructed by assigning the key frames in temporal order. Additionally, the ground truth, created by filtering out similar frames from human-created summaries, is utilized to evaluate the quality of the video summary. Compared with several traditional approaches, the experimental results on 80 videos from two datasets indicate the superior performance of our approach.

  17. Project Elderly. Interim and Final Reports.

    ERIC Educational Resources Information Center

    Miami-Dade Community Coll., FL.

    This report examines Project Elderly, a project developed to provide job possibilities for the older adult in the labor market in metropolitan Miami (FL). A survey questionnaire was developed to (1) assess the opportunities of the elderly for re-entry into volunteer and paid employment positions; (2) determine the extent of the senior population…

  18. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site

  19. Vehicle infrastructure integration proof of concept : results and findings summary-vehicle : final report

    DOT National Transportation Integrated Search

    2009-05-18

    This document describes the objectives and the approach to the testing of the VII Proof of Concept system. A summary of the test results and findings for both the major system functions and the applications designed for the system, are presented alon...

  20. National Environmental/Energy Workforce Assessment, National Summary: Alabama-Indiana. Volume One.

    ERIC Educational Resources Information Center

    National Field Research Center Inc., Iowa City, IA.

    This report is one in a four-volume National Summary which presents existing workforce levels, training programs and career potentials for each of the states, Washington, D.C., Puerto Rico, and the Virgin Islands. Each individual state program summary is followed by a depiction of the current and projected (1976-1981) workforce figures for the…

  1. European Patient Summary Guideline: Focus on Greece.

    PubMed

    Berler, Alexander; Tagaris, Anastassios; Chronaki, Catherine

    2016-01-01

    The European Patient Summary (PS) guideline specifies a minimal dataset of essential and important information for unplanned or emergency care initially defined in the epSOS project with aim to improve patients' safety and quality of Care. The eHealth Network of European Union (EU) Member State (MS) representatives established under Article 14 of the EU directive 2011/24 on patient rights to cross-border healthcare adopted PS guideline in November 2013 and since then the guideline has been part of MS strategic eHealth implementation plans, standardization efforts, and concrete regional, national, European and international projects. This paper reviews implementation efforts for the implementation of an operational patient summary service in Greece drawing on challenges and lessons learned for sustainable standards-based large scale eHealth deployment in Europe and abroad, as well as the reuse of best practices from international standards and integration profiles.

  2. John Jay High School Project "RESCATE." O.E.E. Evaluation Report, 1982-1983. [Final Report.

    ERIC Educational Resources Information Center

    Friedman, Grace Ibanez; Schulman, Robert

    Project RESCATE, in its third and final year of funding, provided instruction in English as a Second Language (ESL) and native language skills, as well as bilingual instruction in science, mathematics, and social studies, to 185 Spanish-speaking students of limited English proficiency (LEP) at John Jay High School in Brooklyn, New York. In…

  3. Metropolitan Child Care Project. Final Report.

    ERIC Educational Resources Information Center

    Vartuli, Sue; Stubbs, Shirley

    A project was conducted in the metropolitan Kansas City community to assess the current state of child care needs of working parents. One project goal was to provide employers with information to help them make decisions about how much responsibility to assume for child care and which employee policies to pursue. A second goal was to assess the…

  4. Project CAREER/CAN. Final Evaluation Report.

    ERIC Educational Resources Information Center

    National Educational Evaluation Services, Inc., Chestnut Hill, MA.

    A description and evaluation of (1) the development of the 4-column process which completes the behavioral objective data base, (2) the development of the computer retrieval capability, and (3) the pilot testing of the product in high school classrooms are included in this summative evaluation of Project CAREER/CAN. (Goals of Project CAREER/CAN,…

  5. Alternative Youth Employment Strategies Project: Final Report.

    ERIC Educational Resources Information Center

    Sadd, Susan; And Others

    The Alternative Youth Employment Strategies (AYES) Project began as one of the demonstration projects funded under the Youth Employment and Demonstration Project Act in 1980. The program, which features three training models, is targeted toward high-risk, disadvantaged youth, especially minority youths from urban areas who had prior involvement…

  6. Fuel Cell Demonstration Project at a Sunline Transit Agency

    NASA Astrophysics Data System (ADS)

    Hsiung, S.

    2001-09-01

    This is the final report summarizing the Fuel Cell Demonstration Project activities of the XCELLSIS Zebus (zero emissions bus) performance at the SunLine Transit Agency in Thousand Palms, California. Under this demonstration project, SunLine participated with XCELLSIS in the fueling, training, operating, and testing of this prototype fuel cell bus. The report presents a summary of project activities, including the results of the 13-month test of the XCELLSIS Zebus performance at SunLine Transit. This final report includes data relating to Zebus performance, along with the successes achieved beyond the technical realm. The study concludes that the project was very useful in establishing operating parameters and environmental testing in extreme heat conditions and in transferring technology to a transit agency. At the end of the 13-month test period, the Zebus ran flawlessly in the Michelin Challenge Bibendum from Los Angeles to Las Vegas, a 275-mile trek. SunLine refueled the Zebus in transit to Baker, California, 150 miles from its home base. Everyone who encountered or rode the Zebus was impressed with its smoothness, low engine noise, and absence of emissions. The study states that the future for the Zebus looks very bright. Fuel cell projects are anticipated to continue in California and Europe with the introduction new buses equipped with Ballard P5 and other fuel cell engines as early as the first half of 2003.

  7. The PIE Institute Project: Final Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark; Carroll, Becky; Helms, Jen; Smith, Anita

    2008-01-01

    The Playful Invention and Exploration (PIE) Institute project was funded in 2005 by the National Science Foundation (NSF). For the past three years, Inverness Research has served as the external evaluator for the PIE project. The authors' evaluation efforts have included extensive observation and documentation of PIE project activities; ongoing…

  8. Year 2000 Computerized Farm Project. Final Report.

    ERIC Educational Resources Information Center

    McGrann, James M.; Lippke, Lawrence A.

    An ongoing project was funded to develop and demonstrate a computerized approach to operation and management of a commercial-sized farm. Other project objectives were to facilitate the demonstration of the computerized farm to the public and to develop individual software packages and make them available to the public. Project accomplishments…

  9. How the Contents of a Bachelor's Degree Final Project of Engineering Evolve towards Innovative Scientific Knowledge: Keys to Success

    ERIC Educational Resources Information Center

    Núñez, Cristina; Guinea, Ana; Callau, Sara; Bengoa, Christophe; Basco, Josep; Gavaldà, Jordi

    2017-01-01

    The Bachelor's Degree Final Project (BDFP) of our school aims to develop a real constructive project, enhance cooperative teamwork and increase productivity of students. We present a real case study, related with engineering and scientific innovation results obtained by BDFP, which has led to an innovative scientific study presented at the 7th…

  10. The California Cooperative Remote Sensing Project

    NASA Technical Reports Server (NTRS)

    Hlavka, Christine A.; Sheffner, Edwin J.

    1988-01-01

    The USDA, the California Department of Water Resources (CDWR), the Remote Sensing Research Program of the University of California (UCB) and NASA have completed a 4-yr cooperative project on the use of remote sensing in monitoring California agriculture. This report is a summary of the project and the final report of NASA's contribution to it. The cooperators developed procedures that combined the use of LANDSAT Multispectral Scanner imagery and digital data with good ground survey data for area estimation and mapping of the major crops in California. An inventory of the Central Valley was conducted as an operational test of the procedures. The satellite and survey data were acquired by USDA and UCB and processed by CDWR and NASA. The inventory was completed on schedule, thus demonstrating the plausibility of the approach, although further development of the data processing system is necessary before it can be used efficiently in an operational environment.

  11. The Argonne Braille Project.

    ERIC Educational Resources Information Center

    Grunwald, Arnold

    A project summary and 20 related papers are presented on the Argonne Braille Machine, a device which produces braille-equivalent information on magnetic tape rather than embossing dots on paper. The summary traces the machine's development while 10 papers cover such issues as user reactions, evaluation proposals, use and care of the machine, the…

  12. Final Project Report - Revised Version

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Prasad, Manika; Carolyn, Koh

    An over-arching goal of this research is to calibrate geophysical techniques for hydrate exploration, evaluation, and production monitoring. Extensive field data of hydrate-bearing sediments exist, but quantitative estimates of the amount and distribution of hydrates are difficult to determine. Thus, the primary project objectives were to relate seismic and acoustic velocities and attenuations to hydrate saturation and texture. The project aimed to collect seismic properties along with other measurements (e.g., complex resistivity, micro-focus x-ray computed tomography, etc.). The multiphysics dataset would enable researchers to understand not only the interaction between mineral surfaces and gas hydrates, but also how the hydratemore » formation method affects the hydrate-sediment system in terms of elastic properties.« less

  13. NOAA's State Climate Summaries for the National Climate Assessment: A Sustained Assessment Product

    NASA Astrophysics Data System (ADS)

    Kunkel, K.; Champion, S.; Frankson, R.; Easterling, D. R.; Griffin, J.; Runkle, J. D.; Stevens, L. E.; Stewart, B. C.; Sun, L.; Veasey, S.

    2016-12-01

    A set of State Climate Summaries have been produced for all 50 U.S. states as part of the National Climate Assessment Sustained Assessment and represent a NOAA contribution to this process. Each summary includes information on observed and projected climate change conditions and impacts associated with future greenhouse gas emissions pathways. The summaries focus on the physical climate and coastal issues as a part of NOAA's mission. Core climate data and simulations used to produce these summaries have been previously published, and have been analyzed to represent a targeted synthesis of historical and plausible future climate conditions. As these are intended to be supplemental to major climate assessment development, the scope of the content remains true to a "summary" style document. Each state's Climate Summary includes its climatology and projections of future temperatures and precipitation, which are presented in order to provide a context for the assessment of future impacts. The climatological component focuses on temperature, precipitation, and noteworthy weather events specific to each state and relevant to the climate change discussion. Future climate scenarios are also briefly discussed, using well-known and consistent sets of climate model simulations based on two possible futures of greenhouse gas emissions. These future scenarios present an internally consistent climate picture for every state and are intended to inform the potential impacts of climate change. These 50 State Climate Summaries were produced by NOAA's National Centers for Environmental Information (NCEI) and the North Carolina State University Cooperative Institute for Climate and Satellites - NC (CICS-NC) with additional input provided by climate experts, including the NOAA Regional Climate Centers and State Climatologists. Each summary document also underwent a comprehensive and anonymous peer review. Each summary contains text, figures, and an interactive web presentation. A full

  14. Quantitative and qualitative analysis of student textbook summary writing

    NASA Astrophysics Data System (ADS)

    Demaree, Dedra; Allie, Saalih; Low, Michael; Taylor, Julian

    2008-10-01

    The majority of "special access" students at the University of Cape Town are second language English speakers for whom reading the physics textbook is daunting. As a strategy to encourage meaningful engagement with the text, students wrote textbook summaries due the day material was covered in class. The summaries were returned, and they could bring them or re-write them for use during their examinations. A framework was developed to analyze the summaries based on Waywood, defining three cognitive levels seen in mathematics journaling: recounting, summarizing, and dialoging. This framework was refined, expanded, and tested. Interviews with students were conducted for their views on summary writing and survey questions were included on their final exams. The study was carried out in the 2007 spring semester of the "Foundation Physics Course," a component of the special access program.

  15. Novel High Efficient Organic Photovoltaic Materials: Final Summary of Research

    NASA Technical Reports Server (NTRS)

    Sun, Sam

    2002-01-01

    The objectives and goals of this project were to investigate and develop high efficient, lightweight, and cost effective materials for potential photovoltaic applications, such as solar energy conversion or photo detector devices. Specifically, as described in the original project proposal, the target material to be developed was a block copolymer system containing an electron donating (or p-type) conjugated polymer block coupled to an electron withdrawing (or n-type) conjugated polymer block through a non-conjugated bridge unit. Due to several special requirements of the targeted block copolymer systems, such as electron donating and withdrawing substituents, conjugated block structures, processing requirement, stability requirement, size controllability, phase separation and self ordering requirement, etc., many traditional or commonly used block copolymer synthetic schemes are not suitable for this system. Therefore, the investigation and development of applicable and effective synthetic protocols became the most critical and challenging part of this project. During the entire project period, and despite the lack of a proposed synthetic polymer postdoctoral research associate due to severe shortage of qualified personnel in the field, several important accomplishments were achieved in this project and are briefly listed and elaborated. A more detailed research and experimental data is listed in the Appendix.

  16. 41. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H. VIEW FROM APPROXIMATELY THE SAME SPOT SHOWING HOW COVERING THE ROCK FILLS WITH SOIL HAS ALMOST OBLITERATED THESE SCARS. TO IDENTIFY A POINT FOR COMPARISON NOTICE THE BRIDE GULCH JUST TO THE LEFT OF THE CENTER IN THE UPPER PICTURE AND COMPARE WITH THE SAME GULCH IN THE LOWER PICTURE. THE AFTER PHOTO OF A BEFORE AND AFTER SET. BEFORE PHOTO IS HI-52-40. - Haleakala National Park Roads, Pukalani, Maui County, HI

  17. Point Focusing Thermal and Electric Applications Project. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Landis, K. E. (Editor)

    1979-01-01

    Background and objectives used for the Workshop for Potential Military and Civil Users for Small Solar Thermal Electric Power Technologies are discussed. A summary of the results and conclusions developed at the workshop regarding small solar thermal electric power technologies is included.

  18. Clinical Trial Results Summary for Laypersons: A User Testing Study.

    PubMed

    Raynor, D K; Myers, L; Blackwell, K; Kress, B; Dubost, A; Joos, A

    2018-01-01

    To apply "user testing" to maximize readability and acceptability of a Clinical Trial Results Laypersons Summary-a new European requirement. "User testing" (using questionnaire and semistructured interview) assessed whether people could find and understand key points. Findings were used to improve content and design, prior to retesting. Participants had a range of levels of health literacy and there was a higher education group. Participants accessed the summary on screen. In round 1 we tested 12 points of information. In round 2 a revised summary addressing round 1 findings was tested, leading to a third final version. In round 1, 2 of 12 points of information did not reach the target and interviews raised further format and content issues (some distracting technical explanations and inability to find or understand the 2 main study purposes). These findings informed revisions for the version tested in round 2, with 2 different points not reaching the target (inclusion criteria relating to duration of seasonal allergies and how researchers found out about participants' symptoms). Identified problems in both rounds were addressed and reflected in the final version. Despite improvements, participants did not consistently understand that summaries were intended for the public, or to only interpret results of single trials in the context of additional trials. All readers, including those with higher education, found the clear and straightforward language acceptable. Applying "user testing" resulted in a largely health-literate summary suitable for people across a range of backgrounds.

  19. The Final Year Project (FYP) in Social Sciences: Establishment of Its Associated Competences and Evaluation Standards

    ERIC Educational Resources Information Center

    Mateo, Joan; Escofet, Anna; Martinez, Francesc; Ventura, Javier; Vlachopoulos, Dimitrios

    2012-01-01

    This paper presents the fundamental characteristics of the Final Year Project (FYP), its associated competences and some evaluation standards that derived from a research conducted by the regional government of Catalonia (Spain) and the Catalan University Quality Assurance Agency. More analytically, the paper begins with the definition of the…

  20. Choosing Optional Infused Career Education for Students in High School Bilingual Programs (Project CHOICE). Final Evaluation Report 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Cantalupo, Denise

    Project CHOICE was an Elementary and Secondary Education Act Title VII-funded project in its fifth and final year of operation at Fort Hamilton High School in Brooklyn and Springfield Gardens High School in Queens (both in New York City). In 1992-93 the project served 364 students of limited English proficiency. Participants received instruction…

  1. 76 FR 64904 - Building Energy Standards Program: Final Determination Regarding Energy Efficiency Improvements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-19

    ... Determination 3. Public Comments Regarding the Preliminary Determination II. Summary of the Comparative Analysis... the Department to finalize this determination. II. Summary of the Comparative Analysis DOE carried out...

  2. Two Different Approaches to Teaching Final-Year Projects for Mechanical Engineers and Biotechnologists at Ngee Ann Polytechnic--Case Studies Approach.

    ERIC Educational Resources Information Center

    Walsh, Kath; Rebaczonok-Padulo, Michael

    1993-01-01

    Ngee Ann Polytechnic, a leading postsecondary technical institution in Singapore, offers English for academic and occupational purposes to prepare students for writing their final year projects. This article discusses the approaches used in Mechanical Engineering and Biotechnology projects. A sample exercise is appended. (Contains two references.)…

  3. Development of a risk-based environmental management tool for drilling discharges. Summary of a four-year project.

    PubMed

    Singsaas, Ivar; Rye, Henrik; Frost, Tone Karin; Smit, Mathijs G D; Garpestad, Eimund; Skare, Ingvild; Bakke, Knut; Veiga, Leticia Falcao; Buffagni, Melania; Follum, Odd-Arne; Johnsen, Ståle; Moltu, Ulf-Einar; Reed, Mark

    2008-04-01

    This paper briefly summarizes the ERMS project and presents the developed model by showing results from environmental fates and risk calculations of a discharge from offshore drilling operations. The developed model calculates environmental risks for the water column and sediments resulting from exposure to toxic stressors (e.g., chemicals) and nontoxic stressors (e.g., suspended particles, sediment burial). The approach is based on existing risk assessment techniques described in the European Union technical guidance document on risk assessment and species sensitivity distributions. The model calculates an environmental impact factor, which characterizes the overall potential impact on the marine environment in terms of potentially impacted water volume and sediment area. The ERMS project started in 2003 and was finalized in 2007. In total, 28 scientific reports and 9 scientific papers have been delivered from the ERMS project (http://www.sintef.no/erms).

  4. 40 CFR 51.115 - Air quality data and projections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Air quality data and projections. 51... quality data and projections. (a) Each plan must contain a summary of data showing existing air quality. (b) Each plan must: (1) Contain a summary of air quality concentrations expected to result from...

  5. 40 CFR 51.115 - Air quality data and projections.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false Air quality data and projections. 51... quality data and projections. (a) Each plan must contain a summary of data showing existing air quality. (b) Each plan must: (1) Contain a summary of air quality concentrations expected to result from...

  6. 40 CFR 51.115 - Air quality data and projections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Air quality data and projections. 51... quality data and projections. (a) Each plan must contain a summary of data showing existing air quality. (b) Each plan must: (1) Contain a summary of air quality concentrations expected to result from...

  7. 40 CFR 51.115 - Air quality data and projections.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false Air quality data and projections. 51... quality data and projections. (a) Each plan must contain a summary of data showing existing air quality. (b) Each plan must: (1) Contain a summary of air quality concentrations expected to result from...

  8. 40 CFR 51.115 - Air quality data and projections.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Air quality data and projections. 51... quality data and projections. (a) Each plan must contain a summary of data showing existing air quality. (b) Each plan must: (1) Contain a summary of air quality concentrations expected to result from...

  9. Cooperative Program Improvement; An Experiment in ABE In-Service Training. Doolittle Family Education Center Experimental In-Service Training Project. Final Report.

    ERIC Educational Resources Information Center

    Griffith, William S.; And Others

    This document, consisting of seven chapters and 12 appendixes, is a full final report of the Doolittle Family Education Center Experimental In-Service Training Project. Chapter II consists of the history and plan of the project including an explanation of the framework of the model that was used to conceptualize the project. Chapter III is a…

  10. 2020 Vision Project Summary: FY99

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K.W. Gordon; K.P. Scott

    2000-01-01

    During the 1998-99 school year, students from participating schools completed and submitted a variety of scenarios describing potential world and regional conditions in the year 2020 and their possible effect on U.S. national security. This report summarizes the student's views and describes trends observed over the course of the 2020 Vision project's four years.

  11. Summary of Notifiable Infectious Diseases and Conditions - United States, 2015.

    PubMed

    Adams, Deborah A; Thomas, Kimberly R; Jajosky, Ruth Ann; Foster, Loretta; Baroi, Gitangali; Sharp, Pearl; Onweh, Diana H; Schley, Alan W; Anderson, Willie J

    2017-08-11

    The Summary of Notifiable Infectious Diseases and Conditions - United States, 2015 (hereafter referred to as the summary) contains the official statistics, in tabular and graphical form, for the reported occurrence of nationally notifiable infectious diseases and conditions in the United States for 2015. Unless otherwise noted, data are final totals for 2015 reported as of June 30, 2016. These statistics are collected and compiled from reports sent by U.S. state and territories, New York City, and District of Columbia health departments to the National Notifiable Diseases Surveillance System (NNDSS), which is operated by CDC in collaboration with the Council of State and Territorial Epidemiologists (CSTE). This summary is available at https://www.cdc.gov/MMWR/MMWR_nd/index.html. This site also includes summary publications from previous years.

  12. Summary of Notifiable Infectious Diseases and Conditions - United States, 2013.

    PubMed

    Adams, Deborah; Fullerton, Kathleen; Jajosky, Ruth; Sharp, Pearl; Onweh, Diana; Schley, Alan; Anderson, Willie; Faulkner, Amanda; Kugeler, Kiersten

    2015-10-23

    The Summary of Notifiable Infectious Diseases and Condition-United States, 2013 (hereafter referred to as the summary) contains the official statistics, in tabular and graphic form, for the reported occurrence of nationally notifiable infectious diseases and conditions in the United States for 2013. Unless otherwise noted, data are final totals for 2013 reported as of June 30, 2014. These statistics are collected and compiled from reports sent by U.S. state and territory, New York City, and District of Columbia health departments to the National Notifiable Diseases Surveillance System (NNDSS), which is operated by CDC in collaboration with the Council of State and Territorial Epidemiologists (CSTE). This summary is available at http://www.cdc.gov/mmwr/mmwr_nd/index.html. This site also includes summary publications from previous years.

  13. Summary of Notifiable Infectious Diseases and Conditions - United States, 2014.

    PubMed

    Adams, Deborah A; Thomas, Kimberly R; Jajosky, Ruth Ann; Foster, Loretta; Sharp, Pearl; Onweh, Diana H; Schley, Alan W; Anderson, Willie J

    2016-10-14

    The Summary of Notifiable Infectious Diseases and Conditions-United States, 2014 (hereafter referred to as the summary) contains the official statistics, in tabular and graphic form, for the reported occurrence of nationally notifiable infectious diseases and conditions in the United States for 2014. Unless otherwise noted, data are final totals for 2014 reported as of June 30, 2015. These statistics are collected and compiled from reports sent by U.S. state and territory, New York City, and District of Columbia health departments to the National Notifiable Diseases Surveillance System (NNDSS), which is operated by CDC in collaboration with the Council of State and Territorial Epidemiologists (CSTE). This summary is available at http://www.cdc.gov/mmwr/mmwr_nd/index.html. This site also includes summary publications from previous years.

  14. Multisource energy system project

    NASA Astrophysics Data System (ADS)

    Dawson, R. W.; Cowan, R. A.

    1987-03-01

    The mission of this project is to investigate methods of providing uninterruptible power to Army communications and navigational facilities, many of which have limited access or are located in rugged terrain. Two alternatives are currently available for deploying terrestrial stand-alone power systems: (1) conventional electric systems powered by diesel fuel, propane, or natural gas, and (2) alternative power systems using renewable energy sources such as solar photovoltaics (PV) or wind turbines (WT). The increased cost of fuels for conventional systems and the high cost of energy storage for single-source renewable energy systems have created interest in the hybrid or multisource energy system. This report will provide a summary of the first and second interim reports, final test results, and a user's guide for software that will assist in applying and designing multi-source energy systems.

  15. Seismic vulnerability of new highway construction, executive summary.

    DOT National Transportation Integrated Search

    2002-03-01

    This executive summary gives an overview of the results of FHWA Contract DTFH61-92-C-00112, Seismic Research Program, : which performed a series of special studies addressing the seismic design of new construction. The objectives of this project : we...

  16. Seismic Vulnerability of New Highway Construction, Executive Summary.

    DOT National Transportation Integrated Search

    2002-03-01

    This executive summary gives an overview of the results of FHWA Contract DTFH61-92-C-00112, Seismic Research Program, which performed a series of special studies addressing the seismic design of new construction. The objectives of this project were t...

  17. Social Service Aide Project. Summary Reports and Proposals.

    ERIC Educational Resources Information Center

    YMCA of Metropolitan Chicago, IL. Career Options Research and Development (CORD).

    The Social Service Aide Project for the training and education of paraprofessionals is a part of the Career Options Research and Development Project of the Young Men's Christian Association of Chicago. These materials include: (1) "A Report of Pilot A Social Service Aide Program: Phase I and II (September 1969-August 1970)," (2)…

  18. Ceramics Technology Project database: September 1991 summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keyes, B.L.P.

    1992-06-01

    The piston ring-cylinder liner area of the internal combustion engine must withstand very-high-temperature gradients, highly-corrosive environments, and constant friction. Improving the efficiency in the engine requires ring and cylinder liner materials that can survive this abusive environment and lubricants that resist decomposition at elevated temperatures. Wear and friction tests have been done on many material combinations in environments similar to actual use to find the right materials for the situation. This report covers tribology information produced from 1986 through July 1991 by Battelle columbus Laboratories, Caterpillar Inc., and Cummins Engine Company, Inc. for the Ceramic Technology Project (CTP). All datamore » in this report were taken from the project`s semiannual and bimonthly progress reports and cover base materials, coatings, and lubricants. The data, including test rig descriptions and material characterizations, are stored in the CTP database and are available to all project participants on request. Objective of this report is to make available the test results from these studies, but not to draw conclusions from these data.« less

  19. National Environmental/Energy Workforce Assessment, National Summary: Nevada-South Carolina. Volume Three.

    ERIC Educational Resources Information Center

    National Field Research Center Inc., Iowa City, IA.

    This report is one in a four-volume National Summary which presents existing workforce levels, training programs and career potentials for each of the states, Washington, D.C., Puerto Rico, and the Virgin Islands. Each individual state program summary is followed by a depiction of the current and projected (1976-1981) workforce figures for the…

  20. Ares Project Overview - Quality in Design

    NASA Technical Reports Server (NTRS)

    Cianciola, Chris; Crane, Kenneth

    2008-01-01

    This presentation introduces the audience to the overall goals of the Ares Project, which include providing human access to low-Earth orbit, the Moon, and beyond. The presentation also provides an overview of with the vehicles that will execute those goals and progress made on the vehicles to date. The briefing will provide an introduction to Lean, Six Sigma, and Kaizen practices Ares will use to improve the overall effectiveness and quality of its efforts. Finally, the briefing includes a summary of Safety and Mission Assurance practices being implemented within[Ares to ensure safety and quality early in the design process. Integrating Safety and Mission Assurance in Design: This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safer T and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

  1. New York Harbor water quality survey, 1994. Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brosnan, T.M.; O`Shea, M.L.

    1995-10-24

    This summary presents the results of the 1994 survey, followed by a synopsis of recent changes to pollutant loads from NYC facilities. In general, conventional water quality, as indicated by coliform bacterica and DO levels, continues to improve in most areas of NY Harbor. However, violations of the `never less than` DO standards, although improved, are still occasionally recorded at 50-75% of all stations in summer. Therefore, loadings of nutrients and organic carbon, and changes in water column stratification and flushing rate, remain a concern, as does the appropriateness of the current `never the less` DO standards.

  2. A Summary Score for the Framingham Heart Study Neuropsychological Battery

    PubMed Central

    Downer, Brian; Fardo, David W.; Schmitt, Frederick A.

    2015-01-01

    Objective To calculate three summary scores of the Framingham Heart Study neuropsychological battery and determine which score best differentiates between subjects classified as having normal cognition, test-based impaired learning and memory, test-based multidomain impairment, and dementia. Method The final sample included 2,503 participants. Three summary scores were assessed: (a) composite score that provided equal weight to each subtest, (b) composite score that provided equal weight to each cognitive domain assessed by the neuropsychological battery, and (c) abbreviated score comprised of subtests for learning and memory. Receiver operating characteristic analysis was used to determine which summary score best differentiated between the four cognitive states. Results The summary score that provided equal weight to each subtest best differentiated between the four cognitive states. Discussion A summary score that provides equal weight to each subtest is an efficient way to utilize all of the cognitive data collected by a neuropsychological battery. PMID:25804903

  3. A Summary Score for the Framingham Heart Study Neuropsychological Battery.

    PubMed

    Downer, Brian; Fardo, David W; Schmitt, Frederick A

    2015-10-01

    To calculate three summary scores of the Framingham Heart Study neuropsychological battery and determine which score best differentiates between subjects classified as having normal cognition, test-based impaired learning and memory, test-based multidomain impairment, and dementia. The final sample included 2,503 participants. Three summary scores were assessed: (a) composite score that provided equal weight to each subtest, (b) composite score that provided equal weight to each cognitive domain assessed by the neuropsychological battery, and (c) abbreviated score comprised of subtests for learning and memory. Receiver operating characteristic analysis was used to determine which summary score best differentiated between the four cognitive states. The summary score that provided equal weight to each subtest best differentiated between the four cognitive states. A summary score that provides equal weight to each subtest is an efficient way to utilize all of the cognitive data collected by a neuropsychological battery. © The Author(s) 2015.

  4. 76 FR 40394 - Final Plan for Fiscal Year 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... DEPARTMENT OF JUSTICE Office of Juvenile Justice and Delinquency Prevention [OJP (OJJDP) Docket No. 1563] Final Plan for Fiscal Year 2011 AGENCY: Office of Juvenile Justice and Delinquency Prevention.... SUMMARY: The Office of Juvenile Justice and Delinquency Prevention is publishing this notice of its Final...

  5. Anthropometric Training Project. Final Report.

    ERIC Educational Resources Information Center

    San Diego State Coll., CA.

    The Anthropometric Training Project was aimed at providing a training program for select students to develop research competency in an area relating body type, composition, anthropometric assessment, and physical performance measures. The program involves interdisciplinary cooperation in training through seminars, laboratory practice, and…

  6. Project Head Start Research and Evaluation Center, Syracuse University Research Institute. Final Report, November 1, 1967.

    ERIC Educational Resources Information Center

    Hall, Vernon; And Others

    This document describes the research activities of the Syracuse University Evaluation and Research Center for the year September 1, 1966 through August 31, 1967. This final report is organized on the basis of six research projects, which have been abstracted under the following titles and numbers: (1) Experiments in Grammatical Processing in…

  7. Workplace Literacy Project. Final Report.

    ERIC Educational Resources Information Center

    Lopilato, Louis

    The final report on a Mercy College (New York) program of mathematics and vocational English-as-a-Second-Language (ESL) instruction for limited-English-proficient workers in a manufacturing company is presented. The report consists of documentary materials, and is organized according to the five chronological terms in which the program operated,…

  8. Access for All: Collaboration for Comprehensive Child Care for Deaf and Hearing Preschoolers and Their Families. Project Access. Final Report.

    ERIC Educational Resources Information Center

    Solit, Gail A.

    This final report presents activities and accomplishments of a three-year outreach project to link programs and agencies serving deaf and hard of hearing children and their families with child care programs in their communities. Each year project staff provided training in establishing integrated early childhood programming and child care for at…

  9. Project Summary: Biology-Inspired Autonomous Control

    DTIC Science & Technology

    2011-02-01

    AUTHOR( S ) 5d. PROJECT NUMBER 2304 Johnny H. Evers 5e. TASK NUMBER AM 5f. WORK UNIT NUMBER 08 7. PERFORMING...ORGANIZATION NAME( S ) AND ADDRESS(ES) Air Force Research Laboratory, Munitions Directorate 8. PERFORMING ORGANIZATION REPORT NUMBER AFRL/RWAV...101 West Eglin Blvd Eglin AFB, FL 32542-6810 AFRL-RW-EG-TP-2011-006 9. SPONSORING / MONITORING AGENCY NAME( S ) AND ADDRESS(ES

  10. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on highmore » fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.« less

  11. Commercialization of PV-powered pumping systems for use in utility PV service programs. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-03-01

    The project described in this report was a commercialization effort focused on cost-effective remote water pumping systems for use in utility-based photovoltaic (PV) service programs. The project combined a commercialization strategy tailored specifically for electric utilities with the development of a PV-powered pumping system that operates conventional ac pumps rather than relying on the more expensive and less reliable PV pumps on the market. By combining these two attributes, a project goal was established of creating sustained utility purchases of 250 PV-powered water pumping systems per year. The results of each of these tasks are presented in two parts containedmore » in this Final Summary Report. The first part summarizes the results of the Photovoltaic Services Network (PSN) as a new business venture, while the second part summarizes the results of the Golden Photon system installations. Specifically, results and photographs from each of the system installations are presented in this latter part.« less

  12. William H. Taft High School, Project Adelante. O.E.E. Evaluation Report, 1982-1983. [Final Report].

    ERIC Educational Resources Information Center

    Keyes, Jose Luis; Schulman, Robert

    Project Adelante, in its third and final year of funding, provided instruction in English as a Second Language (ESL) and Spanish language skills, as well as bilingual instruction in mathematics, science, and social studies, to 230 (fall semester) and 235 (spring semester) limited English proficient Hispanic students at Willaim H. Taft High School,…

  13. Project F. A. S. T.: Facilitating Academic Study Techniques for Handicapped Children. Volume 2. Final Report.

    ERIC Educational Resources Information Center

    Martin, Clessen J.

    Volume 2, the appendix to the final report of Project FAST, consists of prose selections used to study the effects of text reduction techniques on the comprehension and recall of written materials among visually handicapped and hearing impaired subjects. Each selection is presented in various versions such as 10 percent subjective deleted, 20…

  14. Montana Faxnet Project. Final Report.

    ERIC Educational Resources Information Center

    Brander, Linda L.

    This report summarizes the activities and accomplishments of the Montana Faxnet Project, which was created to design and demonstrate a statewide document delivery network utilizing telefacsimile equipment that would create equitable access for all Montanans accessing and retrieving information, and reduce the waiting time for requested materials…

  15. IRIS Toxicological Review of 1,4-Dioxane (Final Report)

    EPA Science Inventory

    EPA announced the release of the final report, Toxicological Review of 1,4-Dioxane (CAS No. 123-91-1): In Support of Summary Information on the Integrated Risk Information System (IRIS). The final Toxicological Review of 1,4-dioxane provides scientific support and rationa...

  16. Study of Procedures for Determining the Least Restrictive Environment (LRE) Placement of Handicapped Children: Final Project Report.

    ERIC Educational Resources Information Center

    Thouvenelle, Suzanne; And Others

    The final document in a series on least restrictive environment (LRE) placement for handicapped students summarizes the objectives and findings of the project. Research questions, methodology, and conclusions are reviewed from each of four research activities: state education agency analysis; local education agency analysis; legal analysis; and…

  17. Summary of Pellet Technology Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gebhart, III, Gerald E.; Baylor, Larry R.; Bell, Gary L.

    This report summarizes the activities and budget information of ORNL’s pellet technology program from the start of FY2014 through FY2017. Cost summaries are broken down by year and spending category. Milestone activities are outlined and described by year and further described in the project narrative. The project narrative outlines the main pellet injection technology advances enabled by the pellet technology program. A list of published research products is included, along with biographies of personnel involved. This document was prepared in support of the April 24, 2018, review of the pellet technology program at ORNL.

  18. Semantic-Web Architecture for Electronic Discharge Summary Based on OWL 2.0 Standard.

    PubMed

    Tahmasebian, Shahram; Langarizadeh, Mostafa; Ghazisaeidi, Marjan; Safdari, Reza

    2016-06-01

    Patients' electronic medical record contains all information related to treatment processes during hospitalization. One of the most important documents in this record is the record summary. In this document, summary of the whole treatment process is presented which is used for subsequent treatments and other issues pertaining to the treatment. Using suitable architecture for this document, apart from the aforementioned points we can use it in other fields such as data mining or decision making based on the cases. In this study, at first, a model for patient's medical record summary has been suggested using semantic web-based architecture. Then, based on service-oriented architecture and using Java programming language, a software solution was designed and run in a way to generate medical record summary with this structure and at the end, new uses of this structure was explained. in this study a structure for medical record summaries along with corrective points within semantic web has been offered and a software running within Java along with special ontologies are provided. After discussing the project with the experts of medical/health data management and medical informatics as well as clinical experts, it became clear that suggested design for medical record summary apart from covering many issues currently faced in the medical records has also many advantages including its uses in research projects, decision making based on the cases etc.

  19. New Jersey Technical Assistance Project (N.J. TAP): "Educational Resources and Support Services on Behalf of Children with Multiple Sensory Impairment." Final Report.

    ERIC Educational Resources Information Center

    New Jersey State Dept. of Education, Trenton.

    This final report describes activities and accomplishments of the New Jersey Technical Assistance Project, a project to improve educational resources and support services for students with multiple sensory impairment (deaf-blindness). Activities and accomplishments are presented in a tabular format for each project goal and objective. The project…

  20. Project Aprendizaje. Final Evaluation Report 1992-93.

    ERIC Educational Resources Information Center

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  1. I-39 dynamic message sign project summary

    DOT National Transportation Integrated Search

    2005-01-01

    The Illinois Department of Transportation (IDOT) sought to deploy a message sign system consisting of permanently-mounted dynamic message signs around the Rockford metropolitan area. The project goal was to begin building a system of remotely-activat...

  2. ITS pilot project demonstration program summary report

    DOT National Transportation Integrated Search

    2008-12-01

    The purpose of this contract is to conduct a technical performance analysis and operational evaluation of ITS projects : demonstrated at the Innovative Mobility Experience Showcase in conjunction with the 2005 ITS World Congress. Some : of these proj...

  3. Well Elderly Integrated Training Project. Final Report.

    ERIC Educational Resources Information Center

    Summit-Portage Area Health Education Network, Akron, OH.

    The Well Elderly Integrated Training Project was conceptualized as a service-oriented endeavor with an evaluation component. The project required that a university medical school resource faculty develop an integrated training program and materials on health education (wellness) for trainers who were respected, healthy elderly high in the senior…

  4. Computer Conferencing Project. Final Report.

    ERIC Educational Resources Information Center

    McNeil, Donald R.; And Others

    This report of a 3-year project discusses the results of the testing of computer conferencing and e-mail (electronic mail) at Montgomery College (Maryland) over a period of four semesters. The product was designed to answer the following questions: (1) Could computer conferencing or e-mail increase access? (2) Would the quality of the instruction…

  5. Hyperspectral Technology Transfer to the US Department of Interior: Summary of Results of the NASA/DOI Hyperspectral Technology Transfer Project

    NASA Technical Reports Server (NTRS)

    Root, Ralph; Wickland, Diane

    2001-01-01

    In 1997 the Office of Biological Informatics and Outreach (OBIO), Biological Resources Division, US Geological Survey and NASA, Office of Earth Science (OES), initiated a coordinated effort for applying Airborne Visible and Infrared Imaging Spectrometer (AVIRIS) data and analysis, as a technology transfer project, to critical DOI environmental issues in four study sites throughout the United States. This work was accomplished by four US Department of the Interior (DOI) study teams with support from NASA/OES principal investigators and the Office of Earth Science programs. The studies, including personnel, objectives, background, project plans, and milestones were documented in a project website at . This report summarizes the final outcomes of the project, detailing accomplishments, lessons learned, and benefits realized to NASA, the US Geological Survey, and the participating DOI bureaus.

  6. Conflict Management in Schools: Sowing Seeds for a Safer Society. Final Report of the School Conflict Management Demonstration Project 1990-1993.

    ERIC Educational Resources Information Center

    Wheeler, Terrence; And Others

    In August 1990, the Ohio Commission on Dispute Resolution and Conflict Management initiated a three-year School Conflict Management Demonstration Project. This publication is the final report on the Project. Twenty schools, which reflected the state's diversity, were selected to help assess the impact of the conflict management programs. The…

  7. Community College Technical Mathematics Project. Final Report.

    ERIC Educational Resources Information Center

    Self, Samuel L.

    The purpose of the research project was to develop an applied or technical mathematics curriculum which would meet the needs of vocational-technical students at the community college level. The research project was divided into three distinct phases: Identifying the mathematical concepts requisite for job-entry competencies in each of the…

  8. New and Emerging Occupations Project. Final Report.

    ERIC Educational Resources Information Center

    Southeast Community Coll., Lincoln, NE.

    This document reports a project to define, identify, and describe new and emerging occupations in Nebraska and disseminate that information to vocational education program and curriculum planners. Chapter 1 describes the background, problem, and purpose of the project. Chapter 2 sets forth the objectives and discusses procedures for developing a…

  9. Nuclear Energy Innovation Workshops. Executive Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, Todd; Jackson, John; Hildebrandt, Phil

    The nuclear energy innovation workshops were organized and conducted by INL on March 2-4, 2015 at the five NUC universities and Boise State University. The output from these workshops is summarized with particular attention to final summaries that were provided by technical leads at each of the workshops. The current revision includes 3-4 punctuation corrections and a correction of the month of release from May to June.

  10. FHWA bicycle-pedestrian count technology pilot project : summary report

    DOT National Transportation Integrated Search

    2016-12-01

    This report summarizes the Federal Highway Administration (FHWA)s one-year Bicycle-Pedestrian Count Technology Pilot Project. The purpose of the pilot project was to increase the organizational and technical capacity of Metropolitan Planning Organ...

  11. Delays affecting ITS projects : summary of findings

    DOT National Transportation Integrated Search

    2003-11-01

    This report documents the findings of a program review conducted from October 2002 to September 2003 that investigated what delays continue to affect ITS projects. The program review also identified what actions staffs at state DOTs are taking to add...

  12. The Oregon Applied Academics Project: Final Report

    ERIC Educational Resources Information Center

    Pearson, Donna; Richardson, George B.; Sawyer, Jennifer M.

    2013-01-01

    This report contains the findings of the Oregon Applied Academics research and development project which spanned three academic years from 2010 through 2013. The overall purpose of the project was to develop and implement a technical math course that would meet graduation requirements and improve student performance. The State of Oregon has been…

  13. Project D. E. A. F. Final Report.

    ERIC Educational Resources Information Center

    Hairston, Ernest E.

    Project D.E.A.F., its introduction and background, purpose, clientele, methodology, and activities, are described. Project D.E.A.F. was established by an expansion grant from the Rehabilitation Service Administration of the Department of Health, Education and Welfare, in cooperation with the Ohio Bureau of Vocational Rehabilitation for the purpose…

  14. Motivation for Reading Improvement. Final Project Report.

    ERIC Educational Resources Information Center

    Kit Carson Union Elementary School District, Hanford, CA.

    This document reports on a project aimed at motivating students to develop attitudes that learning can be fun and that it can benefit them, and at discouraging students from working just to please the teacher. The project involved the use of a "News Laboratory," which included a United Press International wire service, various…

  15. Draft project management update to the Iowa DOT Project Development Manual : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  16. Conceptual design of advanced central receiver power systems sodium-cooled receiver concept. Volume 1. Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-06-01

    The conceptual design of an advanced central receiver power system using liquid sodium as a heat transport medium has been completed by a team consisting of the Energy Systems Group (prime contractor), McDonnell Douglas, Stearns-Roger, The University of Houston, and Salt River Project. The purpose of this study was to determine the technical and economic advantages of this concept for commercial-scale power plants. This final report covers all tasks of the project. These tasks were as follows: (1) review and analysis of preliminary specification; (2) parametric analysis; (3) select commercial configuration; (4) commercial plant conceptual design; (5) assessment of commercialmore » plant; (6) advanced central receiver power system development plan; (7) program plan; (8) reports and data; (9) program management; and (10) safety analysis. A programmatic overview of the accomplishments of this program is given. The 100-MW conceptual commercial plant, the 281-MW optimum plant, and the 10-MW pilot plant are described. (WHK)« less

  17. A Summary of the NASA Design Environment for Novel Vertical Lift Vehicles (DELIVER) Project

    NASA Technical Reports Server (NTRS)

    Theodore, Colin R.

    2018-01-01

    The number of new markets and use cases being developed for vertical take-off and landing vehicles continues to explode, including the highly publicized urban air taxi and package deliver applications. There is an equally exploding variety of novel vehicle configurations and sizes that are being proposed to fill these new market applications. The challenge for vehicle designers is that there is currently no easy and consistent way to go from a compelling mission or use case to a vehicle that is best configured and sized for the particular mission. This is because the availability of accurate and validated conceptual design tools for these novel types and sizes of vehicles have not kept pace with the new markets and vehicles themselves. The Design Environment for Novel Vertical Lift Vehicles (DELIVER) project was formulated to address this vehicle design challenge by demonstrating the use of current conceptual design tools, that have been used for decades to design and size conventional rotorcraft, applied to these novel vehicle types, configurations and sizes. In addition to demonstrating the applicability of current design and sizing tools to novel vehicle configurations and sizes, DELIVER also demonstrated the addition of key transformational technologies of noise, autonomy, and hybrid-electric and all-electric propulsion into the vehicle conceptual design process. Noise is key for community acceptance, autonomy and the need to operate autonomously are key for efficient, reliable and safe operations, and electrification of the propulsion system is a key enabler for these new vehicle types and sizes. This paper provides a summary of the DELIVER project and shows the applicability of current conceptual design and sizing tools novel vehicle configurations and sizes that are being proposed for urban air taxi and package delivery type applications.

  18. Final Environmental Assessment for Stormwater Drainage Project on F. E. Warren Air Force Base, Wyoming

    DTIC Science & Technology

    2005-05-01

    Colorado Butterfly Habitat on F. E. Warren AFB Stormwater Drainage Project, Final Environmental Assessment April 2005 F. E. Warren AFB iii Figure...A.11 Colorado Butterfly Plant Populations Near Outfall 1 Figure A.12 Preble’s Habitat on F. E. Warren AFB Figure A.13 Preble’s Captures on F. E...to threatened species habitat in the vicinity of the outfalls to Crow Creek, the base will do the following: Colorado butterfly plant: 1

  19. A SEASAT report. Volume 1: Program summary

    NASA Technical Reports Server (NTRS)

    Pounder, E. (Editor)

    1980-01-01

    The program background and experiment objectives are summarized, and a description of the organization and interfaces of the project are provided. The mission plan and history are also included as well as user activities and a brief description of the data system. A financial and manpower summary and preliminary results of the mission are also included.

  20. Georgia Vocational Student Assessment Project. Final Report.

    ERIC Educational Resources Information Center

    Vocational Technical Education Consortium of States, Atlanta, GA.

    A project was conducted to develop vocational education tests for use in Georgia secondary schools, specifically for welding, machine shop, and sheet metal courses. The project team developed an outline of an assessment model that included the following components: (1) select a program for use in developing test items; (2) verify duties, tasks,…

  1. Mercer County Community College Workplace Skills Project. Grant Period March 1, 1991-August 31, 1992. Final Evaluation.

    ERIC Educational Resources Information Center

    Mercer County Community Coll., Trenton, NJ.

    This final report of an 18-month workplace literacy project (a partnership of Mercer County Community College, a large automobile components parts manufacturer, a hospital, a physics laboratory, and a chemical plant) contains the following: (1) and introduction; (2) a performance report on nine goals of the program; (3) a schedule of…

  2. 77 FR 64543 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNVB01000 L51100000.GN0000.LVEMF12CF010 241A; NVN-082096; NVN-084632; NVN-091272; 12-08807; MO 4500039779; TAS: 14X5017] Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NV Correction...

  3. IRIS Toxicological Review of Naphthalene (1998 Final)

    EPA Science Inventory

    EPA announced the release of the final report, Toxicological Review of Naphthalene: in support of the Integrated Risk Information System (IRIS). The updated Summary for Naphthalene and accompanying toxicological review have been added to the IRIS Database.

  4. IRIS Toxicological Review of Phosgene (Final Report)

    EPA Science Inventory

    EPA announced the release of the final report, Toxicological Review of Phosgene: in support of the Integrated Risk Information System (IRIS). The updated Summary for Phosgene and accompanying toxicological review have been added to the IRIS Database.

  5. IRIS Toxicological Review of Acrolein (2003 Final)

    EPA Science Inventory

    EPA announced the release of the final report, Toxicological Review of Acrolein: in support of the Integrated Risk Information System (IRIS). The updated Summary for Acrolein and accompanying toxicological review have been added to the IRIS Database.

  6. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Final ACT configuration evaluation

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Final ACT Configuration Evaluation Task of the Integrated Application of Active Controls (IAAC) technology project within the energy efficient transport program is summarized. The Final ACT Configuration, through application of Active Controls Technology (ACT) in combination with increased wing span, exhibits significant performance improvements over the conventional baseline configuration. At the design range for these configurations, 3590 km, the block fuel used is 10% less for the Final ACT Configuration, with significant reductions in fuel usage at all operational ranges. Results of this improved fuel usage and additional system and airframe costs and the complexity required to achieve it were analyzed to determine its economic effects. For a 926 km mission, the incremental return on investment is nearly 25% at 1980 fuel prices. For longer range missions or increased fuel prices, the return is greater. The technical risks encountered in the Final ACT Configuration design and the research and development effort required to reduce these risks to levels acceptable for commercial airplane design are identified.

  7. Lower Merrimack Valley Workplace Education Project. Final Report.

    ERIC Educational Resources Information Center

    Norris, Cynthia Zylkuski; Breen, Patricia K.

    A description is provided of the Lower Merrimack Valley Workplace Education Project (WEP), an educational project that offers English-as-a-Second-Language (ESL) and job-specific education classes to hourly employees in the Semiconductor Division of Alpha Industries. The challenge of the project was to create a WEP that could accommodate the…

  8. Youth Employment Strategy (YES) 1997-2002: Summary of Recent Summative Evaluation Results. Final Report

    ERIC Educational Resources Information Center

    Human Resources and Skills Development Canada, 2004

    2004-01-01

    This report provides a summary of six summative evaluation studies that were implemented and completed between 1999 and 2002. The evaluations were conducted on three different streams of Canada's Youth Employment Strategy (YES). The Youth Employment Strategy was introduced by the federal government in 1997 to address employment related challenges…

  9. IRIS Toxicological Review of Chloroform (Final Report)

    EPA Science Inventory

    EPA is announcing the release of the final report, Toxicological Review of Chloroform: in support of the Integrated Risk Information System (IRIS). The updated Summary for Chloroform and accompanying Quickview have also been added to the IRIS Database.

  10. Energy Engineering Analysis (EEA) program for Red River Army Depot, Texas. Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The objectives of this Energy Engineering Analysis (EEA) for RRAD were three fold: Develop a systematic plan of projects which will result in reducing energy consumption. Consider renewable energy sources with the objective of establishing an orderly procedure for reducing use of non-renewable energy sources. Determine the feasibility of Total Energy (TE), Selective Energy (SE), and Central Heating Plant (CHP) concepts using alternative fuels. In essence, an assessment of the entire energy picture at RRAD was undertaken. This report is a summary of that effort. RRAD was originally built during 1941 and 1942 as a reserve ordnance depot for themore » Army. Since then, the missions and activities at RRAD have broadened to the point that it is now one of the largest Army depots in the continental United States. Located just west of Texarkana, Texas, RRAD encompasses an area of approximately 19,886 acres. The primary missions at RRAD are general supply and maintenance of vital Army equipment and ordnance material. The supply activities constitute the stocking, distribution, storage and supply of general Army supplies for the central region of the United States. Supply of vehicles, ammunition and guided missiles from RRAD encompasses a much larger region. The maintenance and repair functions at RRAD consists of the overhaul, modification, conversion and repair of automotive equipment and combat vehicles, missile systems and components, armament, and ammunition. Approximately 5500 people are currently employed at RRAD to carry out its mission.« less

  11. DOE-EPSCOR SPONSORED PROJECT FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhu, Jianting

    Concern over the quality of environmental management and restoration has motivated the model development for predicting water and solute transport in the vadose zone. Soil hydraulic properties are required inputs to subsurface models of water flow and contaminant transport in the vadose zone. Computer models are now routinely used in research and management to predict the movement of water and solutes into and through the vadose zone of soils. Such models can be used successfully only if reliable estimates of the soil hydraulic parameters are available. The hydraulic parameters considered in this project consist of the saturated hydraulic conductivity andmore » four parameters of the water retention curves. To quantify hydraulic parameters for heterogeneous soils is both difficult and time consuming. The overall objective of this project was to better quantify soil hydraulic parameters which are critical in predicting water flows and contaminant transport in the vadose zone through a comprehensive and quantitative study to predict heterogeneous soil hydraulic properties and the associated uncertainties. Systematic and quantitative consideration of the parametric heterogeneity and uncertainty can properly address and further reduce predictive uncertainty for contamination characterization and environmental restoration at DOE-managed sites. We conducted a comprehensive study to assess soil hydraulic parameter heterogeneity and uncertainty. We have addressed a number of important issues related to the soil hydraulic property characterizations. The main focus centered on new methods to characterize anisotropy of unsaturated hydraulic property typical of layered soil formations, uncertainty updating method, and artificial neural network base pedo-transfer functions to predict hydraulic parameters from easily available data. The work also involved upscaling of hydraulic properties applicable to large scale flow and contaminant transport modeling in the vadose zone and

  12. Sustainability Report 2011 Women's Final Four Basketball Tournament

    EPA Pesticide Factsheets

    A summary of the sustainability activities at the 2011 NCAA Women's Final Four Basketball tournament held in Indianapolis, Indiana, a variety of events, initiatives and programs to increase the environmental performance of the event.

  13. JumpStart III Final Report.

    ERIC Educational Resources Information Center

    Cohen, Arthur M.; Brawer, Florence B.; Kozeracki, Carol A.

    This final report for the JumpStart III program presents a summary of the entrepreneurship training programs developed by each of the four JumpStart III partners selected in March 1997. Grants for the colleges totaled $354,546 over 2 years. The Jumpstart funding has been only a starting point for these and the other 12 Jumpstart partners in…

  14. Southeast geysers effluent pipeline project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dellinger, M.

    1998-01-15

    The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept wasmore » feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.« less

  15. Summary Report for the C50 Cryomodule Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drury, Michael; Davis, G; Fischer, John

    2011-03-01

    The Thomas Jefferson National Accelerator Facility has recently completed the C50 cryomodule refurbishment project. The goal of this project was to enable robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project included removal, refurbishment and reinstallation of ten CEBAF cryomodules at a rate of three per year. The refurbishment process included reprocessing of SRF cavities to eliminate field emission and to increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New 'dogleg' couplers were installed between the cavity and helium vessel flanges to intercept secondary electrons thatmore » produce arcing in the fundamental Power Coupler (FPC). Other changes included new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Damaged or worn components were replaced as well. All ten of the refurbished cryomodules are now installed in CEBAF and are currently operational. This paper will summarize the performance of the cryomodules.« less

  16. The Position as Regards Functional Literacy Pilot Projects. Summary.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    A comparative analysis was made of Experimental World Literacy Program projects in 17 nations (Algeria, Brazil, Chile, Equador, Ethiopia, Guinea, India, Iran, Mali, Jamaica, Madagascar, Nigeria, Sudan, Syria, Tanzania, Tunisia, and Venezuela) after 18 months of operation. Included were functional literacy projects in 10 nations, literacy programs…

  17. Summary and Synthesis: How to Present a Research Proposal.

    PubMed

    Setia, Maninder Singh; Panda, Saumya

    2017-01-01

    This concluding module attempts to synthesize the key learning points discussed during the course of the previous ten sets of modules on methodology and biostatistics. The objective of this module is to discuss how to present a model research proposal, based on whatever was discussed in the preceding modules. The lynchpin of a research proposal is the protocol, and the key component of a protocol is the study design. However, one must not neglect the other areas, be it the project summary through which one catches the eyes of the reviewer of the proposal, or the background and the literature review, or the aims and objectives of the study. Two critical areas in the "methods" section that cannot be emphasized more are the sampling strategy and a formal estimation of sample size. Without a legitimate sample size, none of the conclusions based on the statistical analysis would be valid. Finally, the ethical parameters of the study should be well understood by the researchers, and that should get reflected in the proposal.

  18. Summary and Synthesis: How to Present a Research Proposal

    PubMed Central

    Setia, Maninder Singh; Panda, Saumya

    2017-01-01

    This concluding module attempts to synthesize the key learning points discussed during the course of the previous ten sets of modules on methodology and biostatistics. The objective of this module is to discuss how to present a model research proposal, based on whatever was discussed in the preceding modules. The lynchpin of a research proposal is the protocol, and the key component of a protocol is the study design. However, one must not neglect the other areas, be it the project summary through which one catches the eyes of the reviewer of the proposal, or the background and the literature review, or the aims and objectives of the study. Two critical areas in the “methods” section that cannot be emphasized more are the sampling strategy and a formal estimation of sample size. Without a legitimate sample size, none of the conclusions based on the statistical analysis would be valid. Finally, the ethical parameters of the study should be well understood by the researchers, and that should get reflected in the proposal. PMID:28979004

  19. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glasser, Alan H.

    Final technical report on DE-SC0016106. This is the final technical report for a portion of the multi-institutional CEMM project. This report is centered around 3 publications and a seminar presentation, which have been submitted to E-Link.

  20. 75 FR 42819 - Notice of Availability of a Final Environmental Assessment (Final EA) and a Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... the Proposed ORD Airport Surveillance Radar, Model 9, West Chicago, IL AGENCY: Federal Aviation... Surveillance Radar, Model 9, West Chicago, Illinois. SUMMARY: The Federal Aviation Administration (FAA) is... (Final EA) for the Proposed ORD Airport Surveillance Radar, Model 9 (ASR-9), in West Chicago, Illinois...