  1. Waste management project technical baseline description

    SciTech Connect

    Sederburg, J.P.

    1997-08-13

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

  2. Competency model for the project managers of technical projects

    NASA Astrophysics Data System (ADS)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  3. The NIOSH Radiation Dose Reconstruction Project: managing technical challenges.

    PubMed

    Moeller, Matthew P; Townsend, Ronald D; Dooley, David A

    2008-07-01

    Approximately two years after promulgation of the Energy Employees Occupational Illness Compensation Program Act, the National Institute for Occupational Safety and Health Office of Compensation and Analysis Support selected a contractor team to perform many aspects of the radiation dose reconstruction process. The project scope and schedule necessitated the development of an organization involving a comparatively large number of health physicists. From the initial stages, there were many technical and managerial challenges that required continuous planning, integration, and conflict resolution. This paper identifies those challenges and describes the resolutions and lessons learned. These insights are hopefully useful to managers of similar scientific projects, especially those requiring significant data, technical methods, and calculations. The most complex challenge has been to complete defensible, individualized dose reconstructions that support timely compensation decisions at an acceptable production level. Adherence to applying claimant-favorable and transparent science consistent with the requirements of the Act has been the key to establishing credibility, which is essential to this large and complex project involving tens of thousands of individual stakeholders. The initial challenges included garnering sufficient and capable scientific staff, developing an effective infrastructure, establishing necessary methods and procedures, and integrating activities to ensure consistent, quality products. The continuing challenges include maintaining the project focus on recommending a compensation determination (rather than generating an accurate dose reconstruction), managing the associated very large data and information management challenges, and ensuring quality control and assurance in the presence of an evolving infrastructure. The lessons learned concern project credibility, claimant favorability, project priorities, quality and consistency, and critical

  4. Technical data management at the Yucca Mountain Site Characterization Project

    SciTech Connect

    Statler, J.; Newbury, C.M.; Heitland, G.W.

    1992-09-01

    The Department of Energy/Office of Civilian Radioactive waste Management (DOE/OCRWM) is responsible for the characterization of Yucca Mountain, Nevada, to determine its potential as a site of a high-level radioactive waste repository. The characterization of Yucca Mountain encompasses many diverse investigations, both onsite and in laboratories across the country. Investigations are being conducted of the geology, hydrology, mineralogy, paleoclimate, geotechnical properties, and archeology of the area, to name a few. Effective program management requires that data from site investigations be processed, interpreted and disseminated in a timely manner to support model development and validation, repository design, and performance assessment. The Program must also meet regulatory requirements for making the technical data accessible to a variety of external users throughout the life of the Project. Finally, the DOE/OCRWM must make available the data or its description and access location available for use in support of the license application and supporting documentation. To accomplish these objectives, scientific and engineering data, generated by site characterization activities, and technical data, generated by environmental and socioeconomic impact assessment activities, must be systematically identified, cataloged, stored and disseminated in a controlled manner.

  5. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect

    Fix, N. J.

    2008-02-20

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  6. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  7. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  8. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Astrophysics Data System (ADS)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  9. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    SciTech Connect

    Carr, D.; Hertel, B.; Jewett, M.; Janke, R.; Conner, B.

    1996-02-01

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy`s (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities.

  10. SP-100, a project manager`s view. Technical information report

    SciTech Connect

    Truscello, V.C.

    1983-12-01

    Born to meet the special needs of America`s space effort, the SP-100 Program testifies to the cooperation among government agencies. The Department of Energy (DOE), the National Aeronautics and Space Administration (NASA), and the Defense Advanced Research Projects Agency (DARPA) are working together to produce a 100-kW power system for use in outer space. At this point in the effort, it is appropriate to review: The approach to meet program goals; the status of activities of the Project Office, managed by the Jet Propulsion Laboratory (JPL); and, because this is a meeting on materials, answers beings developed by the Project Office to vital questions on refractory alloy technology.

  11. Integrated Project Management: A Case Study in Integrating Cost, Schedule, Technical, and Risk Areas

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2004-01-01

    This viewgraph presentation describes a case study as a model for integrated project management. The ISS Program Office (ISSPO) developed replacement fluid filtration cartridges in house for the International Space Station (ISS). The presentation includes a step-by-step procedure and organizational charts for how the fluid filtration problem was approached.

  12. [Technical project for the management and functioning of an Internal Medicine care unit].

    PubMed

    del Castillo Rueda, A; de Portugal Alvarez, J

    2004-01-01

    The Internal Medicine Services have a central role in the medical care in our hospital system both as to the volume of patients attended and their variety, reflecting of the preparation and multi-tasking ability of their professionals. The current norms for coverage of heads-of-service demands the presentation of a management project that must test our knowledge, skills and aptitudes for the clinical and medical management and in order to reflect them in a document of commitment with the management and with our fellows who are a part of the care unit. The person in charge of the service, as boss, agent or leader, is the one who must mark the strategic lines, to indicate the aims, to define the projects, to coordinate the tasks and to evaluate the results with other offers to obtain agreed-upon aims controlling the different points of view. Our professional and social commitment is: sharing clinical management with ethics, quality and welfare safety, to offer our patients (consumer or users) the best results (effectiveness), with useful measurements (efficacy) and with the minors drawbacks and costs (efficiency). The aim of this work is to offer the elements that are necessary for the accomplishment and introduction of a project of clinical management in a service of internal medicine, highlighting its methodology and the most important problems than can arise as well as the possible care alternatives. PMID:15195484

  13. Technical Training for Managers.

    ERIC Educational Resources Information Center

    Haverland, Edgar M.

    The question has arisen as to what kind of information a manager without extensive technical training needs to learn to supervise effectively. For example, the Nike Hercules fire control platoon leader, usually an officer in his first active duty assignment, seldom has had extensive technical training. Yet he is responsibile for the…

  14. ALS Project Management Manual

    SciTech Connect

    Krupnick, Jim; Harkins, Joe

    2000-05-01

    This manual has been prepared to help establish a consistent baseline of management practices across all ALS projects. It describes the initial process of planning a project, with a specific focus on the production of a formal project plan. We feel that the primary weakness in ALS project management efforts to date stems from a failure to appreciate the importance of ''up-front'' project planning. In this document, we present a guide (with examples) to preparing the documents necessary to properly plan, monitor, and control a project's activities. While following the manual will certainly not guarantee good project management, failure to address the issues we raise will dramatically reduce the chance of success. Here we define success as meeting the technical goals on schedule and within the prescribed budget.

  15. EP&R Standards Project Report: Technical Review of National Incident Management Standards

    SciTech Connect

    Stenner, Robert D.

    2007-04-24

    The importance and necessity for a fully developed and implemented National Incident Management System (NIMS) has been demonstrated in recent years by the impact of national events such as Hurricane Katrina in 2005. Throughout the history of emergency response to major disasters, especially when multiple response organizations are involved, there have been systemic problems in the consistency and uniformity of response operations. Identifying national standards that support the development and implementation of NIMS is key to helping solve these systemic problems. The NIMS seeks to provide uniformity and consistency for incident management by using common terminology and protocols that will enable responders to coordinate their efforts to ensure an efficient response.

  16. [NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 3:] Technical communications in aeronautics: Results of an exploratory study. An analysis of profit managers' and nonprofit managers' responses

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Glassman, Myron; Barclay, Rebecca O.; Oliu, Walter E.

    1989-01-01

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that profit and nonprofit managers in the aerospace community have different technical communications practices. Five assumptions were established for the analysis. Profit and nonprofit managers in the aerospace community were found to have different technical communications practices for one of the five assumptions tested. It was, therefore, concluded that profit and nonprofit managers in the aerospace community do not have different technical communications practices.

  17. Integrated Project Management System description. [UMTRAP Project

    SciTech Connect

    Not Available

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office ( Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs.

  18. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK

    SciTech Connect

    Abitz, R.; Jackson, D.; Eddy-Dilek, C.

    2011-06-27

    The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) and subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.

  19. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  20. Technical assistance contractor Management Plan. Final [report

    SciTech Connect

    Not Available

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  1. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    SciTech Connect

    Cercy, M; Ronald Fayfich, R; Steven P Schneider, S

    2008-12-12

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

  2. Technical Risk Rating of DOE Environmental Projects - 9153

    SciTech Connect

    Cercy, Michael; Fayfich, Ronald; Schneider, Steven

    2009-02-11

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

  3. California Department of Education and California Community College Chancellor's Office Vocational and Technical Education Computer-Managed and Aided Instruction Project: Project Summary.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    This description of the Computer-Managed and Aided Instruction (CMAI) Project includes a summary of a December 1989 CMAI planning meeting, the text of a paper presented at the meeting, and descriptions of each of the five phases of the project. The paper, "Programming the Future," by Gerald C. Angove and Scott Smith, discusses: (1) the…

  4. Technical Assistance Contractor management plan. Revision 1

    SciTech Connect

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  5. When Serious Project Management is a Critical Business Requirement

    NASA Technical Reports Server (NTRS)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  6. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  7. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  8. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  9. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  10. Basic/Technical Literacy Project. Final Report.

    ERIC Educational Resources Information Center

    White River Vocational Technical School, Newport, AR.

    The Basic/Technical Literacy project at White River Vocational Technical School in Arkansas implemented a comprehensive curriculum to raise students' basic reading and technical literacy levels in their chosen skill area. During the project, master vocabulary lists for each skill area were developed, and self-test worksheets and study guides were…

  11. Managing Information On Technical Requirements

    NASA Technical Reports Server (NTRS)

    Mauldin, Lemuel E., III; Hammond, Dana P.

    1993-01-01

    Technical Requirements Analysis and Control Systems/Initial Operating Capability (TRACS/IOC) computer program provides supplemental software tools for analysis, control, and interchange of project requirements so qualified project members have access to pertinent project information, even if in different locations. Enables users to analyze and control requirements, serves as focal point for project requirements, and integrates system supporting efficient and consistent operations. TRACS/IOC is HyperCard stack for use on Macintosh computers running HyperCard 1.2 or later and Oracle 1.2 or later.

  12. [NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 2:] Technical communications in aeronautics: Results of an exploratory study. An analysis of managers' and nonmanagers' responses

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Glassman, Myron; Barclay, Rebecca O.; Oliu, Walter E.

    1989-01-01

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that aerospace managers and nonmanagers have different technical communications practices. Five assumptions were established for the analysis. Aerospace managers and nonmanagers were found to have different technical communications practices for three of the five assumptions tested. Although aerospace managers and nonmanagers were found to have different technical communications practices, the evidence was neither conclusive nor compelling that the presumption of difference in practices could be attributed to the duties performed by aerospace managers and nonmanagers.

  13. Managing Projects for Change: Contextualised Project Management

    ERIC Educational Resources Information Center

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  14. ISS Solar Array Alpha Rotary Joint (SARJ) Bearing Failure and Recovery: Technical and Project Management Lessons Learned

    NASA Technical Reports Server (NTRS)

    DellaCorte, Christopher; Krantz, Timothy L.; Dube, Michael J.

    2011-01-01

    The photovoltaic solar panels on the International Space Station (ISS) track the Sun through continuous rotating motion enabled by large bearings on the main truss called solar array alpha rotary joints (SARJs). In late 2007, shortly after installation, the starboard SARJ had become hard to turn and had to be shut down after exceeding drive current safety limits. The port SARJ, of the same design, had been working well for over 2 years. An exhaustive failure investigation ensued that included multiple extravehicular activities to collect information and samples for engineering forensics, detailed structural and thermal analyses, and a careful review of the build records. The ultimate root cause was determined to be kinematic design vulnerability coupled with inadequate lubrication, and manufacturing flaws; this was corroborated through ground tests, metallurgical studies, and modeling. A highly successful recovery plan was developed and implemented that included replacing worn and damaged components in orbit and applying space-compatible grease to improve lubrication. Beyond the technical aspects, however, lie several key programmatic lessons learned. These lessons, such as running ground tests to intentional failure to experimentally verify failure modes, are reviewed and discussed so they can be applied to future projects to avoid such problems.

  15. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  16. Technical assistance to Ohio closure sites; Technologies to address leachate from the on-site disposal facility at Fernald Environmental Management Project, Ohio

    SciTech Connect

    Hazen, Terry

    2002-08-26

    On August 6-7, 2002, a Technical Assistance Team (''Team'') from the U.S. Department of Energy (DOE) Subsurface Contaminants Focus Area (SCFA) met with Fernald Environmental Management Project (FEMP) personnel in Ohio to assess approaches to remediating uranium-contaminated leachate from the On-Site Disposal Facility (OSDF). The Team was composed of technical experts from national labs, technology centers, and industry and was assembled in response to a request from the FEMP Aquifer Restoration Project. Dave Brettschneider of Fluor Fernald, Inc., requested that a Team of experts be convened to review technologies for the removal of uranium in both brine ion exchange regeneration solution from the Advanced Wastewater Treatment facility and in the leachate from the OSDF. The Team was asked to identify one or more technologies for bench-scale testing as a cost effective alternative to remove uranium so that the brine regeneration solution from the Advanced Waste Water Treatment facility and the leachate from the OSDF can be discharged without further treatment. The Team was also requested to prepare a recommended development and demonstration plan for the alternative technologies. Finally, the Team was asked to make recommendations on the optimal technical solution for field implementation. The Site's expected outcomes for this effort are schedule acceleration, cost reduction, and better long-term stewardship implementation. To facilitate consideration of the most appropriate technologies, the Team was divided into two groups to consider the brine and the leachate separately, since they represent different sources with different constraints on solutions, e.g., short-term versus very long-term and concentrated versus dilute contaminant matrices. This report focuses on the technologies that are most appropriate for the leachate from the OSDF. Upon arriving at FEMP, project personnel asked the Team to concentrate its efforts on evaluating potential technologies and

  17. Advancing Project Management in Learning Organizations

    ERIC Educational Resources Information Center

    Bourne, Lynda; Walker, Derek H. T.

    2004-01-01

    Effective project managers are required to have both "hard" technical skills to help control the iron triangle of time, cost and functional scope as well as relationship management skills to work effectively with people and get the best out of them. This paper argues that project managers also need a third skill: we refer to it as tapping into the…

  18. Project Management Plan

    SciTech Connect

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  19. Community College Technical Mathematics Project. Final Report.

    ERIC Educational Resources Information Center

    Self, Samuel L.

    The purpose of the research project was to develop an applied or technical mathematics curriculum which would meet the needs of vocational-technical students at the community college level. The research project was divided into three distinct phases: Identifying the mathematical concepts requisite for job-entry competencies in each of the…

  20. Spent Nuclear Fuel Project Technical Databook

    SciTech Connect

    Reilly, M.A.

    1998-10-23

    The Spent Nuclear Fuel (SNF) Project Technical Databook is developed for use as a common authoritative source of fuel behavior and material parameters in support of the Hanford SNF Project. The Technical Databook will be revised as necessary to add parameters as their Databook submittals become available.

  1. Project Management in Real Time: A Service-Learning Project

    ERIC Educational Resources Information Center

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  2. Library Digitisation Project Management.

    ERIC Educational Resources Information Center

    Middleton, Michael

    Supervision of library digitization is the focus of this paper. First outlined are the definition, formalization, implementation, and completion phases of project management. Descriptions of management decisions involved in digitization projects follow on matters such as: collection analysis, resourcing, project personnel, production, access and…

  3. Principles of project management

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  4. Technical Aspects of Data Life Cycle Management at WDCC - LObStEr and the ExArch Project

    NASA Astrophysics Data System (ADS)

    Drakenberg, P.; Foell, G.; Thiemann, H.; Toussaint, F.; Lautenschlager, M.

    2011-12-01

    Founded in 1987 and owned by several research facilities, the DKRZ is the German national service centre for climate researchers. It is responsible for the operation of a high performance computer system for basic and applied research in the field of climatology and related disciplines. Its fundamental task is the provision of computer power and mass storage for quantitative computation of complex processes in the climate and earth system with numerical models. In 2003 the Data Management department was approved as World Data Centre for Climate Data (WDCC) by the International Council for Science (ICSU). WDCC provides a data archiving service and offers data management consulting for climate data over the whole life time of data. This includes advice in data storage structure as well as support in metadata layout and creation. Storage of data in the long term tape archive, including appropriate pre-processing is offered to earth-system scientists and is increasingly often being required by funding agencies. Access to the data-sets present in the WDCC tape archive is provided by web-interfaces through which the desired data may be sought-out and downloaded. Despite the impression of simplicity conveyed by the web-interface, however, an extensive hardware and software infrastructure is required to process the steady stream of data requests submitted by users. A distinguishing characteristic of the WDCC archive is that data-sets are maintained as time-series of distinct variables, and this leads to a demand for storage of vast collections of modestly sized items. The challenge here is, to obtain equally good performance for download of single time steps and for long continuous epochs. To address this and other requirements posed by storage of such time-series, we are operating an internally designed and implemented software system (Large Object Storage and Efficient Retrieval, LObStER) that receives SQL-language requests for complete or partial time-series (sent by

  5. A Career Development Model for Project Management Workforces.

    ERIC Educational Resources Information Center

    Duarte, Deborah; And Others

    1995-01-01

    Interviews with project managers (n=50) and lower-level managers (n=100) at NASA identified career paths and job requirements for project management in technical occupations. The necessary skills and actions for developing them were recommended for four career stages: getting established, independent contributor, technical lead/manager, and…

  6. Spent Nuclear Fuel project, project management plan

    SciTech Connect

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  7. Female Project Managers' Workplace Problems: a Survey

    NASA Astrophysics Data System (ADS)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  8. The human genome project: Information management, access, and regulation. Technical progress report, 1 April--31 August 1993

    SciTech Connect

    McInerney, J.D.; Micikas, L.B.

    1993-09-10

    Efforts are described to prepare educational materials including computer based as well as conventional type teaching materials for training interested high school and elementary students in aspects of Human Genome Project.

  9. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 224 Altus Air Force Base Solar Technologies

    SciTech Connect

    Russo, Bryan J.

    2010-09-30

    The principal goal of this project was to evaluate altus Air Force Base for building integrated silicon or thin film module photovoltaic opportunities. This report documents PNNL's efforts and documents study conclusions.

  10. FLEXI Project Management Survey

    NASA Astrophysics Data System (ADS)

    Rohunen, Anna; Krzanik, Lech; Kuvaja, Pasi; Similä, Jouni; Rodriguez, Pilar; Hyysalo, Jarkko; Linna, Tommi

    FLEXI Project Management Survey (FLEXI PMS) has been established to gain detailed knowledge on how the software industry - in particular successful companies - manages agile software development. FLEXI PMS investigates the actual agile values, principles, practices and contexts. The survey is supported by a careful literature review and analysis of existing studies. Special attention is attached to large, multi-site, multi-company and distributed projects - the target area of FLEXI project. The survey is intended to provide solid data for further knowledge acquisition and project/company positioning with regard to feasible agile management practices.

  11. Managing Projects with KPRO

    NASA Technical Reports Server (NTRS)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  12. Niger household energy project: Promoting rural fuelwood markets and village management of natural woodlands. World Bank Technical Paper No. 362

    SciTech Connect

    Foley, G.; Floor, W.; Madon, G.; Lawali, E.M.; Montagne, P.

    1997-05-01

    A radical new strategy for dealing with the problems of energy and the environment in the Sahel is being implemented in Niger. Rather than have urban wood traders go into the countryside to cut the wood and truck it back to the cities, the government is giving village communities control over their natural woodlands in return for a commitment to manage the woodlands and the production of fuelwood sustainability. This paper details the rationale, history, and prospects of this innovative energy strategy. It describes local physical and socioeconomic conditions, with particular attention to the `tiger bush` that forms much of Niger`s natural woodland. If the strategy can be expanded, it will have potential for replication over much of the Sahel and other countries in Sub-Saharan Africa.

  13. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  14. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  15. Spent nuclear fuel project technical databook

    SciTech Connect

    Reilly, M.A.

    1998-07-22

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values.

  16. Ace Project as a Project Management Tool

    ERIC Educational Resources Information Center

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  17. Risk Management of NASA Projects

    NASA Technical Reports Server (NTRS)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  18. Project DIVIDE Instrument Development. Technical Report # 0810

    ERIC Educational Resources Information Center

    Ketterlin-Geller, Leanne; Jung, Eunju; Geller, Josh; Yovanoff, Paul

    2008-01-01

    In this technical report, we describe the development of cognitive diagnostic test items that form the basis of the diagnostic system for Project DIVIDE (Dynamic Instruction Via Individually Designed Environments). The construct underlying the diagnostic test is division of fractions. We include a description of the process we used to identify the…

  19. Project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Gawdiak, Yuri O. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  20. Management evolution in the LSST project

    NASA Astrophysics Data System (ADS)

    Sweeney, Donald; Claver, Charles; Jacoby, Suzanne; Kantor, Jeffrey; Krabbendam, Victor; Kurita, Nadine

    2010-07-01

    The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.

  1. Technical Facilities Management, Loan Pool, and Calibration

    NASA Technical Reports Server (NTRS)

    Smith, Jacob

    2011-01-01

    My work at JPL for the SURF program began on June 11, 2012 with the Technical Facilities Management group (TFM). As well as TFM, I worked with Loan Pool and Metrology to help them out with various tasks. Unlike a lot of other interns, I did not have a specific project rather many different tasks to be completed over the course of the 10 weeks.The first task to be completed was to sort through old certification reports in 6 different boxes to locate reports that needed to be archived into a digital database. There were no reports within these boxes that needed to be archived but rather were to be shredded. The reports went back to the early 1980's and up to the early 2000's. I was looking for reports dated from 2002 to 2012

  2. Campus Energy Management Projects.

    ERIC Educational Resources Information Center

    Welzenbach, Lanora, Ed.

    This publication is a compilation of data concerning energy conservation measures at more than 60 colleges and universities in the United States and Canada. The data are presented for the information of all who are interested in the variety of ways in which institutions of higher education are managing energy. Project descriptions are divided into…

  3. Enhanced project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  4. More Top Managers Have Technical Backgrounds.

    ERIC Educational Resources Information Center

    Storck, William J.

    1982-01-01

    A Chemical and Engineering News survey shows that among chief executives in 20 U.S. chemical firms, 73 percent have some technical training; 53 percent of these have bachelors in chemistry or chemical engineering, substantially increased from a decade ago. Comments on the trend toward more technically trained management are provided. (Author/JN)

  5. Core Technical Capability Laboratory Management System

    NASA Technical Reports Server (NTRS)

    Shaykhian, Linda; Dugger, Curtis; Griffin, Laurie

    2008-01-01

    The Core Technical Capability Lab - oratory Management System (CTCLMS) consists of dynamically generated Web pages used to access a database containing detailed CTC lab data with the software hosted on a server that allows users to have remote access.

  6. Project Management Methodology in Human Resource Management

    ERIC Educational Resources Information Center

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  7. Hanford Environmental Dose Reconstruction Project. Monthly Technical Report, November 1987

    SciTech Connect

    Haerer, H. A.

    1987-11-01

    This monthly report for November 1987 summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction Project being conducted at Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP).

  8. Leveraging Independent Management and Chief Engineer Hierarchy: Vertically and Horizontally-Derived Technical Authority Value

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    In the development of complex spacecraft missions, project management authority is usually extended hierarchically from NASA's highest agency levels down to the implementing institution's project team level, through both the center and the program. In parallel with management authority, NASA utilizes a complementary, but independent, hierarchy of technical authority (TA) that extends from the agency level to the project, again, through both the center and the program. The chief engineers (CEs) who serve in this technical authority capacity oversee and report on the technical status and ensure sound engineering practices, controls, and management of the projects and programs. At the lowest level, implementing institutions assign project CEs to technically engage projects, lead development teams, and ensure sound technical principles, processes, and issue resolution. At the middle level, programs and centers independently use CEs to ensure the technical success of their projects and programs. At the agency level, NASA's mission directorate CEs maintain technical cognizance over every program and project in their directorate and advise directorate management on the technical, cost, schedule, and programmatic health of each. As part of this vertically-extended CE team, a program level CE manages a continually varying balance between penetration depth and breadth across his or her assigned missions. Teamwork issues and information integration become critical for management at all levels to ensure value-added use of both the synergy available between CEs at the various agency levels, and the independence of the technical authority at each organization.

  9. Department of Energy Project Management System

    SciTech Connect

    Not Available

    1981-01-08

    This manual provides guidance to all appropriate personnel for implementation of DOE Project Management Policy. It sets forth the principles and requirements that govern the development, approval, and execution of DOE's outlay programs as embodied within the Project Management System (PMS). Its primary goal is to assure application of sound management principles providing a disciplined, systematic, and coordinated approach resulting in efficient planning, organization, coordination, budgeting, management, review, and control of DOE projects. The provisions of this manual are mandatory for the Department's Major Systems Acquisitions (MSA's) and Major Projects and will be used for other projects to the extent practicable. Department's project-management task is over 250 projects, with a total estimated cost in excess of $24 billion at completion. This diverse array of project activities requires a broad spectrum of scientific, engineering, and management skills to assure that they meet planned technical and other objectives and are accomplished on schedule, within cost and scope, and that they serve the purposes intended. In recognition of these requirements and the Department's ever-increasing magnitude of responsibilities, an interim Project Management System was established and has been in use for over a year. This manual constitutes an update of the system based on the experience gained and lessons learned during this initial period.

  10. Switchgear project meticulously managed.

    PubMed

    Baillie, Jonathan

    2015-04-01

    Electrical engineering and estates personnel at Sodexo--which manages a wide range of soft and hard facilities management services for five hospitals under a PFI contract at the Manchester Royal Infirmary--have successfully planned, managed, and co-ordinated, a complex electrical engineering project which saw high voltage (HV) switchgear in the site's main intake sub-station dismantled by the supplier to repair a potential earthing mechanism fault which would have prevented individual switchgear panels being shut down, to, for example, cater for renovation of electrical cabling or components cross the site's high voltage network. With detailed planning, including provision for bringing onto site temporary bulk generators, and the formulation of a 600-step switching programme, the replacement of potential faulty driver components in the disconnect mechanism for 20 HV switchgear panels was completed in just four weeks, with minimal interruption to the vast complex's power supply. PMID:26281425

  11. Technical assistance contractor management plan: Surface and ground water

    SciTech Connect

    Not Available

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

  12. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  13. NIF Project Management System Description

    SciTech Connect

    Wolfe, C.R.

    1997-08-01

    This document has been prepared for two purposes: 1. To demonstrate compliance with the project management requirements of DOE Order 430. 1, Life-Cycle Asset Management (LCAM). 2. To summarize in one place the approved Project documents which, taken as a whole, describe the NIF Project Management System.

  14. Maximum Capital Project Management.

    ERIC Educational Resources Information Center

    Adams, Matt

    2002-01-01

    Describes the stages of capital project planning and development: (1) individual capital project submission; (2) capital project proposal assessment; (3) executive committee; and (4) capital project execution. (EV)

  15. Management and Evaluation Plan for Instructional Systems Development for Vocational-Technical Education. Project ABLE: Development and Evaluation of an Experimental Curriculum for the New Quincy (Mass.) Vocational-Technical School.

    ERIC Educational Resources Information Center

    Ullery, J. William

    Intended to serve as a manual for the developmental and evaluative activities of Project ABLE, this report presents the management and evaluation plan for instructional system development. Major emphasis of the plan is the formation of evaluative procedures drawing on student performance data as the primary source of feedback. To insure continuous…

  16. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    SciTech Connect

    Not Available

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements.

  17. Capital projects: Egypt case study. Technical report

    SciTech Connect

    Lieberson, J.; Stallard, J.

    1994-03-01

    This report assesses the US Agency for International Development`s (A.I.D.`s) capital assistance program in Egypt in terms of both its commercial benefits for the United States and its developmental benefits for Egypt. In regard to the first aspect, the study found that few A.I.D.-funded projects or studies generated either participation by other donors or follow-on sales for U.S. companies. The report places much of the blame for this on U.S. firms` failure to take advantage of a clear opportunity to develop the Egyptian commercial market. Findings regarding the developmental benefits of the projects are mixed. (1) The projects helped support strong private sector growth in Egypt through the 1980`s. Nonetheless, their economic and financial rates of return were generally disappointing. (2) The projects were built to a high technical standard, but their sustainability is in doubt. (3) The pursuit of commercial advantage for U.S. firms did not distort the developmental goals of the projects. Overall, the report attributes the disappointing economic results of A.I.D.`s capital assistance program to a poor policy environment, which the reforms pursued in connection with the program did little to change.

  18. Crew Transportation Technical Management Processes

    NASA Technical Reports Server (NTRS)

    Mckinnie, John M. (Compiler); Lueders, Kathryn L. (Compiler)

    2013-01-01

    Under the guidance of processes provided by Crew Transportation Plan (CCT-PLN-1100), this document, with its sister documents, International Space Station (ISS) Crew Transportation and Services Requirements Document (CCT-REQ-1130), Crew Transportation Technical Standards and Design Evaluation Criteria (CCT-STD-1140), Crew Transportation Operations Standards (CCT STD-1150), and ISS to Commercial Orbital Transportation Services Interface Requirements Document (SSP 50808), provides the basis for a National Aeronautics and Space Administration (NASA) certification for services to the ISS for the Commercial Provider. When NASA Crew Transportation System (CTS) certification is achieved for ISS transportation, the Commercial Provider will be eligible to provide services to and from the ISS during the services phase.

  19. Project management in the Apollo program: An interdisciplinary study

    NASA Technical Reports Server (NTRS)

    Drucker, E. E.; Pooler, W. S.; Wilemon, D. L.; Wood, B. D.

    1972-01-01

    Findings concerning project management in the NASA Apollo program are presented. The Apollo program in the context of the total NASA organization is examined along with the nature of project management and the manner in which project managers functioned in the Apollo program. The utilization of the in-house technical competence in the support of the Apollo program, and the formal and informal relationships between Apollo managers and the contractors are discussed.

  20. Fluid Management Plan for the Project Shoal Area, Off-sites Subproject, CAU 447, Revision 0 (with Record of Technical Change No. 1, 2, and 3)

    SciTech Connect

    USDOE /NV

    1999-04-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV) has initiated the Off-Site Project to characterize the hazards posed to human health and the environment as a result of underground nuclear testing activities at facilities other than the Nevada Test Site (NTS). The Project Shoal Area (PSA) is one of the Off-Sites Project areas located off the NTS, but within the state of Nevada. The PSA is located approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. Four wells were drilled at the PSA in 1996 as part of the site investigation administered through the Federal Facility Agreement and Consent Order (FFACO) (1996). The hydrogeologic data gathered from these wells was used to support the groundwater flow and contaminant transport modeling of the PSA. However, the subsequent evaluation of the groundwater model concluded that further delineation of the subsurface was required to reduce uncertainties in the model. In accordance with the FFACO, an addendum to the Corrective Action Investigation Plan (CAIP) for the proposed PSA subsurface investigation, Corrective Action Unit 447, was developed. The addendum proposed the drilling and construction of four additional wells and the conduct of hydrologic testing at the PSA. This Fluid Management Plan (FMP) provides guidance for the management of fluids generated from the well construction and testing activities at the PSA.

  1. Project Management in Higher Education

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  2. Technical and Management Information System (TMIS)

    NASA Technical Reports Server (NTRS)

    Rau, Timothy R.

    1987-01-01

    The TMIS goals developed to support the Space Station Program (SSP) mission requirements are outlined. The TMIS will provide common capabilities to all SSP centers and facilitate the flow of technical and management information throughout the program as well as SSP decision-making processes. A summary is presented of the various TMIS phases.

  3. Breckinridge Project, initial effort. Report VI. Project Management Plan

    SciTech Connect

    1982-01-01

    Report VI presents a comprehensive plan for the management of the Breckinridge Project. For the purpose of this report, the project work is divided into five major project phases: Development, Engineering, Procurement, Construction, and Operations. The results of the Development Phase (Initial Effort) of the project are discussed in Section 1.0. This phase of the project was performed under a Cooperative Agreement with US Department of Energy and has produced 43 volumes of documentation. Fifteen volumes contain information of proprietary nature for patented processes and are therefore classified as Limited Access; however, twenty-eight volumes are not classified and are suitable for public dissemination. This Project Management Plan is a volume of the unclassified documentation. The other twenty-seven volumes contain comprehensive data on technical, financial, and environmental aspects of the project. Each of the four remaining project phases is presented starting with the extensive planning that will be performed and continuing through to the execution and completion of each phase. The major roles of the Operator, Ashland Synthetic Fuels, Inc. (ASFI), and the Managing Contractor are defined. Although a contract has not yet been executed with a Managing Contractor, the procedures, controls, organization and management philosophy of Bechtel Petroleum, Inc., are presented in this report as being representative of those used by contractors in the business of performing the engineering, procurement, and construction of projects of this size and complexity. The organizational structures of the Operator and the Managing Contractor are described, with designation of key project team personnel by job description and organization charts. Provisions for cost, schedule, and material control are described.

  4. A success paradigm for project managers in the aerospace industry

    NASA Astrophysics Data System (ADS)

    Bauer, Barry Jon

    Within the aerospace industry, project managers traditionally have been selected based on their technical competency. While this may lead to brilliant technical solutions to customer requirements, a lack of management ability can result in failed programs that over-run on cost, are late to critical path schedules, fail to fully utilize the diversity of talent available within the program team, and otherwise disappoint key stakeholders. This research study identifies the key competencies that a project manager should possess in order to successfully lead and manage a project in the aerospace industry. The research attempts to show evidence that within the aerospace industry, it is perceived that management competency is more important to project management success than only technical competence.

  5. Plutonium immobilization project development and testing technical project office quality assurance program description

    SciTech Connect

    Gould, T H; MacLean, L M; Ziemba, J M

    1999-07-08

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  6. Space Station Freedom - Technical and management challenges

    NASA Technical Reports Server (NTRS)

    Moser, Thomas L.

    1988-01-01

    The development of the Space Station is reviewed, focusing on the technical and managerial aspects of the program. The optimization of the Space Station configuration, utilization impacts on design, technical aspects of the distribution systems, and the problems of designing for a lifetime of 30 years or more are discussed. In addition, cost reduction studies, testing and verification, determining the assembly sequence, and operational communications and support systems are examined. Managerial aspects of the program include organization, program control, management tools and processes, and the integration of elements from the international partners.

  7. Designing an Academic Project Management Program: A Collaboration between a University and a PMI Chapter

    ERIC Educational Resources Information Center

    Poston, Robin S.; Richardson, Sandra M.

    2011-01-01

    The demand for project management skills in industry is increasing resulting in a higher demand for project management educational programs. Universities are addressing industry demand by developing project management courses, degree offerings and certificate programs that focus on both technical and general project management skills. While…

  8. Engineering, technical, and management support services

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report summarizes by task the engineering, technical, and management support services provided by Vitro Corporation to NASA Headquarters Office of Safety, Reliability, Maintainability, and Quality Assurance (now called Office of Safety and Mission Assurance (OSMA)) (Code Q) under Contract Number NASW-4311 from the period February 10, 1994. Each task summary includes significant Vitro accomplishments, conclusions, and recommendations for future efforts in each of the divisions within OSMA.

  9. Engineering, technical, and management support services

    NASA Astrophysics Data System (ADS)

    1994-02-01

    This report summarizes by task the engineering, technical, and management support services provided by Vitro Corporation to NASA Headquarters Office of Safety, Reliability, Maintainability, and Quality Assurance (now called Office of Safety and Mission Assurance (OSMA)) (Code Q) under Contract Number NASW-4311 from the period February 10, 1994. Each task summary includes significant Vitro accomplishments, conclusions, and recommendations for future efforts in each of the divisions within OSMA.

  10. The Project Manager's Tool Kit

    NASA Technical Reports Server (NTRS)

    Cameron, W. Scott

    2003-01-01

    Project managers are rarely described as being funny. Moreover, a good sense of humor rarely seems to be one of the deciding factors in choosing someone to be a project manager, or something that pops up as a major discussion point at an annual performance review. Perhaps this is because people think you aren't serious about your work if you laugh. I disagree with this assessment, but that's not really my point. As I talk to people either pursuing a career in project management, or broadening their assignment to include project management, I encourage them to consider what tools they need to be successful. I suggest that they consider any strength they have to be part of their Project Management (PM) Tool Kit, and being funny could be one of the tools they need.

  11. 25 CFR 286.11 - Management and technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Management and technical assistance. 286.11 Section 286... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making... insure that competent management and technical assistance is available to the grantee in the...

  12. 6 Project-Management Tips

    ERIC Educational Resources Information Center

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  13. Waste Management Process Improvement Project

    SciTech Connect

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-02-25

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle.

  14. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    NASA Astrophysics Data System (ADS)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  15. Minnesota Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Kloos, Eric

    This final report describes activities and accomplishments of the 3-year federally supported Minnesota Deaf-Blind Technical Assistance Project. The project provided training and technical assistance, information sharing, and support services to families of children with deaf-blindness. Activities and accomplishments included: collaboration with…

  16. Project Hanford management contract quality improvement project management plan

    SciTech Connect

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  17. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  18. Managing a project's legacy: implications for organizations and project management

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  19. Management Information System Project.

    ERIC Educational Resources Information Center

    Foley, Walter J.; Harr, Gordon G.

    The Management Information System (MIS) described in this report represents a plan to utilize modern management techniques to facilitate the goal of a learner-responsive school system. The MIS component is being developed to meet the need for the coordination of the resources of staff, facilities, and time with the long range planning and…

  20. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    SciTech Connect

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements.

  1. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    ERIC Educational Resources Information Center

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  2. Technical assistance for Meharry Medical College Energy Efficiency Project. Final project status and technical report

    SciTech Connect

    1996-05-08

    This report presents the results of a program to provide technical assistance to Meharry Medical College. The purpose of the program is to facilitate Meharry`s effort to finance a campus-wide facility retrofit. The US Department of Energy (USDOE) funded the program through a grant to the Tennessee Department of Economic and Community Development (TECD). The University of Memphis-Technology and Energy Services (UM-TES), under contract to TECD, performed program services. The report has three sections: (1) introduction; (2) project definition, financing, and participants; and (3) opportunities for federal participation.

  3. Management of technical date in Nihon Doro kodan

    NASA Astrophysics Data System (ADS)

    Hanada, Jun'ichi

    Nihon Doro Kodan Laboratory has collected and contributed technical data (microfiches, aerial photographs, books and literature) on plans, designs, constructions and maintenance of the national expressways and the ordinary toll roads since 1968. This work is systematized on computer to retrieve and contribute data faster. Now Laboratory operates Technical Data Management System which manages all of technical data and Technical Document Management System which manages technical documents. These systems stand on users' on-line retrieval and data accumuration by microfiches and optical disks.

  4. Improving Space Project Cost Estimating with Engineering Management Variables

    NASA Technical Reports Server (NTRS)

    Hamaker, Joseph W.; Roth, Axel (Technical Monitor)

    2001-01-01

    Current space project cost models attempt to predict space flight project cost via regression equations, which relate the cost of projects to technical performance metrics (e.g. weight, thrust, power, pointing accuracy, etc.). This paper examines the introduction of engineering management parameters to the set of explanatory variables. A number of specific engineering management variables are considered and exploratory regression analysis is performed to determine if there is statistical evidence for cost effects apart from technical aspects of the projects. It is concluded that there are other non-technical effects at work and that further research is warranted to determine if it can be shown that these cost effects are definitely related to engineering management.

  5. A Statistical Project Control Tool for Engineering Managers

    NASA Technical Reports Server (NTRS)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  6. Pecos River Water Management Project

    NASA Astrophysics Data System (ADS)

    Roberts, J. D.; James, S. C.

    2003-12-01

    Sandia National Laboratories is providing technical assistance to farmer members of the Carlsbad Irrigation District (CID) to better plan the storage, delivery, and application of water to the Carlsbad Project. The surface waters along the Pecos River are allocated by the State of New Mexico to three major entities: 1) The State of Texas - each year a percentage of water from the natural river flow must be delivered to Texas as governed by the Interstate Streams Commission; 2) CID farmer members - a fixed portion of water must be delivered to the farming members of the CID; and 3) wildlife - an amount of water must be allocated to support the wildlife habitat in the Pecos River, most notably, the endangered Pecos Bluntnose Shiner Minnow. The Pecos Bluntnose Shiner Minnow habitat preference is under investigation by other state and national agencies and preliminary work has established that water depth, water velocity, and sediment activity (dunes, ripples, etc.) are the key parameters influencing minnow habitat preference. The amount of water (river flow rate) necessary to maintain a preferable habitat to support this species has yet to be determined. With a limited amount of water in the Pecos River and its reservoirs, it is critical to allocate water efficiently such that habitat is maintained, the farmers of the CID are supported, and New Mexico meets its commitments to the State of Texas. This study investigates the relationship between flow rate in the river and water depth, water velocity, and sediment activity. The goal is to establish a predictive tool that supports informed decisions about water management practices along the Pecos River that will maximize water available for agriculture and the State of Texas while maintaining the aquatic habitat.

  7. Final Technical Report. Project Boeing SGS

    SciTech Connect

    Bell, Thomas E.

    2014-12-31

    Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include; Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection; Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event; Improved malware detection and zero-day threat response capability; Improved ability to systematically evaluate and secure in house and vendor sourced software applications; Improved ability to continuously monitor

  8. Applied Space Systems Engineering. Chapter 17; Manage Technical Data

    NASA Technical Reports Server (NTRS)

    Kent, Peter

    2008-01-01

    Effective space systems engineering (SSE) is conducted in a fully electronic manner. Competitive hardware, software, and system designs are created in a totally digital environment that enables rapid product design and manufacturing cycles, as well as a multitude of techniques such as modeling, simulation, and lean manufacturing that significantly reduce the lifecycle cost of systems. Because the SSE lifecycle depends on the digital environment, managing the enormous volumes of technical data needed to describe, build, deploy, and operate systems is a critical factor in the success of a project. This chapter presents the key aspects of Technical Data Management (TDM) within the SSE process. It is written from the perspective of the System Engineer tasked with establishing the TDM process and infrastructure for a major project. Additional perspectives are reflected from the point of view of the engineers on the project who work within the digital engineering environment established by the TDM toolset and infrastructure, and from the point of view of the contactors who interface via the TDM infrastructure. Table 17.1 lists the TDM process as it relates to SSE.

  9. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  10. UMTRA Project Office Records Management Plan

    SciTech Connect

    Not Available

    1993-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office maintains two distinct records handling areas. One of the areas is maintained by a Technical Assistance Contractor (TAC), and is referred to as the UMTRA Project Document Control Center (UPDCC). The UPDCC manages all UMTRA records except those dealing with contracts, personnel, budgeting, finance, and any other documents which are of a purely administrative nature. The second area, the UMTRA Project Administrative Files Collection (UPAFC), contains all those records listed above that are not managed by the UPDCC. This Records Management Plan (RMP) for the UPAFC will be the framework for identifying the elements and activities that relate to the management and operational aspects involved in the handling of UPAFC. Guidelines for the program will be obtained from US Department of Energy (DOE) Orders. DOE Orders implement the guidelines issued by the National Archives and Records Administration (NARA), the final authority for records management. The RMP will address the life cycle of records, including their creation, maintenance, use, and disposition.

  11. Project management; considerations for success.

    PubMed

    Maas, Jos

    2013-01-01

    During the past two years the author was a project leader for three Information Communication Technology (ICT) security related systems projects for a newly built healthcare facility. These projects were: a CCTV system, an Access Control system and an Identity & Access Management system. During those two years he gained experiences on how to coop with ICT projects related to security and healthcare as well as some pitfalls to be contended with along the way. With this article, he shares his experiences so that colleagues can benefit from them when they are a project leaders for their health facility and need to better decide how or how not to address their project and project issues. PMID:24020323

  12. The three-dimensional matrix -- An evolution in project management

    SciTech Connect

    Glidewell, D.

    1996-09-01

    In the Functional Department Dimension, functional departments such as project management, design, and construction would be maintained to maximize consistency among project teams, evenly allocate training opportunities, and facilitate the crossfeeding of lessons learned and innovative ideas. Functional departments were also determined to be the surest way of complying uniformly with all project control systems required by the Department of Energy (Sandia`s primary external customer). The Technical Discipline dimension was maintained to enhance communication within the technical disciplines, such as electrical engineering, mechanical engineering, civil engineering, etc., and to evenly allocate technical training opportunities, reduce technical obsolescence, and enhance design standards. The third dimension, the Project Dimension, represents the next step in the project management evolution at Sandia, and together with Functional Department and Technical Discipline Dimensions constitutes the three-dimensional matrix. It is this Project Dimension that will be explored thoroughly in this paper, including a discussion of the specific roles and responsibilities of both management and the project team.

  13. Oklahoma Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Watts, Jan, Comp.

    This final report describes the activities and accomplishments of the Oklahoma Deaf-Blind Technical Assistance Project, an effort to systematically provide training, resource provision and technical assistance (TA) to approximately 120-155 children and youth with deaf-blindness, their families, educators and service providers. The overall impact…

  14. Ice Load Project Final Technical Report

    SciTech Connect

    McCoy, Timothy J.; Brown, Thomas; Byrne, Alex

    2014-10-30

    As interest and investment in offshore wind projects increase worldwide, some turbines will be installed in locations where ice of significant thickness forms on the water surface. This ice moves under the driving forces of wind, current, and thermal effects and may result in substantial forces on bottom-fixed support structures. The North and Baltic Seas in Europe have begun to see significant wind energy development and the Great Lakes of the United States and Canada may host wind energy development in the near future. Design of the support structures for these projects is best performed through the use of an integrated tool that can calculate the cumulative effects of forces due to turbine operations, wind, waves, and floating ice. The dynamic nature of ice forces requires that these forces be included in the design simulations, rather than added as static forces to simulation results. The International Electrotechnical Commission (IEC) standard[2] for offshore wind turbine design and the International Organization for Standardization (ISO) standard[3] for offshore structures provide requirements and algorithms for the calculation of forces induced by surface ice; however, currently none of the major wind turbine dynamic simulation codes provides the ability to model ice loads. The scope of work of the project described in this report includes the development of a suite of subroutines, collectively named IceFloe, that meet the requirements of the IEC and ISO standards and couples with four of the major wind turbine dynamic simulation codes. The mechanisms by which ice forces impinge on offshore structures generally include the forces required for crushing of the ice against vertical-sided structures and the forces required to fracture the ice as it rides up on conical-sided structures. Within these two broad categories, the dynamic character of the forces with respect to time is also dependent on other factors such as the velocity and thickness of the moving ice

  15. Technical framework for groundwater restoration. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-04-01

    This document provides the technical framework for groundwater restoration under Phase II of the Uranium Mill Tailings Remedial Action (UMTRA) Project. A preliminary management plan for Phase II has been set forth in a companion document titled Preplanning Guidance Document for Groundwater Restoration''. General principles of site characterization for groundwater restoration, restoration methods, and treatment are discussed in this document to provide an overview of standard technical approaches to groundwater restoration.

  16. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 281 Solar Hot Water Application Assessment for U.S. Army IMCOM-Southeast Region

    SciTech Connect

    Russo, Bryan J.; Chvala, William D.

    2010-09-30

    The Energy Independence and Security Act of 2007 requires installations (EISA) to install solar systems of sufficient capacity to provide 30% of service hot water in new construction and renovations where cost-effective. However, installations are struggling with how to implement solar hot water, and while several installations are installing solar hot water on a limited basis, paybacks remain long. Pacific Northwest National Laboratory (PNNL) was tasked to address this issue to help determine how best to implement solar hot water projects. This documents discusses the results of that project.

  17. Basalt Waste Isolation Project technical program evaluation process: A criteria-based method

    NASA Astrophysics Data System (ADS)

    Babad, H.; Evans, G. C.; Wolfe, B. A.

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the SWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (MWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP will be further formalized and further applied to the review of BWIP technical activities.

  18. Technical Communication Competence and Projected Teacher Success.

    ERIC Educational Resources Information Center

    Powers, William G.; Lowry, David N.

    Technical Communication Competence (TCC)is the competence involved in communicating mental images to others in such a manner as to result in their constructing comparable mental images, a process similar to the primary task demanded of teachers at all levels. In a study designed to discover the extent to which a positive relationship existed…

  19. Evaluation of generation 3 treatment technology for swine waste - A North Carolina's clean water management trust fund project - Technical environmental performance report

    Technology Transfer Automated Retrieval System (TEKTRAN)

    This project evaluated and demonstrated the viability of a third generation manure treatment technology. The technology was developed as an alternative to the lagoon/spray field system typically used to treat the wastewater generated by swine farms in North Carolina. It separates solids and liquids ...

  20. Regional Technical Co-operation for Training Educational Personnel in Planning and Management Using Distance Teaching and Other Techniques. Project Findings and Recommendations. Terminal Report.

    ERIC Educational Resources Information Center

    United Nations Development Programme, Bangkok (Thailand).

    The 12-country cooperative project that is reviewed involved the following activities and outputs: group training workshops/seminars, inter-country study visits, the development of training materials for regional training programs and preparation of a training handbook, support to and development of national training programs, and evaluation.…

  1. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a...

  2. Hazardous materials in aquatic environments of the Mississippi River Basin Project management. Technical quarterly progress report, April 1, 1996--June 30, 1996

    SciTech Connect

    McLachlan, J.; Ide, C.F.; O`Connor, S.

    1996-08-01

    This quarterly report summarizes accomplishments for the Project examining hazardous materials in aquatic environments of the Mississippi River Basin. Among the many research areas summarized are the following: assessment of mechanisms of metal-induced reproductive toxicity in aquatic species as a biomarker of exposure; hazardous wastes in aquatic environment;ecological sentinels of aquatic contamination in the lower Mississippi River System; remediation of selected contaminants; rapid on-site immunassay for heavy metal contamination; molecular mechanisms of developmental toxicity induced by retinoids and retinoid-like molecules; resuseable synthetic membranes for the removal of aromatic and halogenated organic pollutants from waste water; Effects of steroid receptor activation in neurendocrine cell of the mammalian hypothalamus; modeling and assessment of environmental quality of louisiana bayous and swamps; enhancement of environmental education. The report also contains a summary of publications resulting from this project and an appendix with analytical core protocals and target compounds and metals.

  3. Software Tools Streamline Project Management

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  4. Review of the Regional Biomass Energy Program: Technical projects

    SciTech Connect

    Lusk, P.

    1994-12-31

    This article summarizes technical projects of the regional Biomass Energy Program. Projects included are as follows: economic impact studies for renewable energy resources; alternative liquid fuels; Wood pellets fuels forum; residential fuel wood consumption; waste to energy decision-makers guide; fuel assessment for cogeneration facilities; municipal solid waste combustion characteristics.

  5. American Recovery and Reinvestment Act Federal Energy Management Program Technical Assistance Project 184 U.S. Customs and Border Protection Laboratory, Houston, Texas

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-09-30

    This report documents the findings of an on-site energy audit of the U.S. Customs and Border Protection (CBP) Laboratory in Houston, Texas. The focus of the audit was to identify various no-cost and low-cost energy efficiency opportunities that, once implemented, would reduce electricity and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  6. Managing Challenges in a Multi Contractor Project

    NASA Technical Reports Server (NTRS)

    King, Ron

    2011-01-01

    The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

  7. Pagosa Springs geothermal project. Final technical report

    SciTech Connect

    Not Available

    1984-10-19

    This booklet discusses some ideas and methods for using Colorado geothermal energy. A project installed in Pagosa Springs, which consists of a pipeline laid down 8th street with service to residences retrofitted to geothermal space heating, is described. (ACR)

  8. Cost Analysis of Curriculum Programs. A Technical Report. Occupational Education Research Project Final Report.

    ERIC Educational Resources Information Center

    Semple, Robert M.; West, David B.

    A research project was undertaken to design, develop, implement, and test a model to examine and evaluate curriculum programs on a cost efficiency basis. The researchers used existing information and the computerized data management system at Nash Technical College in Rocky Mount, North Carolina, to evaluate the cost effectiveness of each…

  9. Impact of senior design project for the development of leadership and management skills in construction management

    NASA Astrophysics Data System (ADS)

    Chowdhury, Tamara

    2013-08-01

    Senior design courses are a core part of curricula across engineering and technology disciplines. Such courses offer Construction Management (CMG) students the opportunity to bring together, assimilate and apply the knowledge they have acquired over their entire undergraduate academic programme to an applied technical project. Senior or Capstone design course engages students in a real-world project, enhance leadership development, and prepare to manage and lead project teams. The CMG programme's multidisciplinary approach at Alabama A&M University, combines essential components of construction techniques with concepts of business management to develop technically qualified individuals for responsible management roles in the design, construction and operation of major construction projects. This paper analyses the performance of the students and improvement due to the interaction with the faculty advisors and industrial panel during the two semester Capstone project. The results of this Capstone sequence have shown a continuous improvement of student performance.

  10. The Project Manager Who Saved His Country

    NASA Technical Reports Server (NTRS)

    Baniszewski, John

    2008-01-01

    George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

  11. 25 CFR 286.11 - Management and technical assistance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Management and technical assistance. 286.11 Section 286... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making of a grant to finance an Indian economic enterprise, the Assistant Secretary—Indian Affairs...

  12. 25 CFR 286.11 - Management and technical assistance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Management and technical assistance. 286.11 Section 286.11... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making of a grant to finance an Indian economic enterprise, the Assistant Secretary—Indian Affairs...

  13. 25 CFR 101.7 - Management and technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Management and technical assistance. 101.7 Section 101.7... THE REVOLVING LOAN FUND § 101.7 Management and technical assistance. Prior to and concurrent with the approval of a United States direct loan to finance an economic enterprise, the Commissioner will...

  14. 25 CFR 101.7 - Management and technical assistance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Management and technical assistance. 101.7 Section 101.7... THE REVOLVING LOAN FUND § 101.7 Management and technical assistance. Prior to and concurrent with the approval of a United States direct loan to finance an economic enterprise, the Commissioner will...

  15. 25 CFR 286.11 - Management and technical assistance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Management and technical assistance. 286.11 Section 286... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making of a grant to finance an Indian economic enterprise, the Assistant Secretary—Indian Affairs...

  16. 25 CFR 101.7 - Management and technical assistance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Management and technical assistance. 101.7 Section 101.7... THE REVOLVING LOAN FUND § 101.7 Management and technical assistance. Prior to and concurrent with the approval of a United States direct loan to finance an economic enterprise, the Commissioner will...

  17. 25 CFR 286.11 - Management and technical assistance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Management and technical assistance. 286.11 Section 286... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making of a grant to finance an Indian economic enterprise, the Assistant Secretary—Indian Affairs...

  18. 25 CFR 101.7 - Management and technical assistance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Management and technical assistance. 101.7 Section 101.7... THE REVOLVING LOAN FUND § 101.7 Management and technical assistance. Prior to and concurrent with the approval of a United States direct loan to finance an economic enterprise, the Commissioner will...

  19. 25 CFR 101.7 - Management and technical assistance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Management and technical assistance. 101.7 Section 101.7... THE REVOLVING LOAN FUND § 101.7 Management and technical assistance. Prior to and concurrent with the approval of a United States direct loan to finance an economic enterprise, the Commissioner will...

  20. Independent Business Owner/Managers. Project TEAMS. (Techniques and Education for Achieving Management Skills).

    ERIC Educational Resources Information Center

    Platte Technical Community Coll., Columbus, NE.

    Prepared as part of Platte Technical Community College's project to help managers and supervisors develop practical, up-to-date managerial skills in a relatively short time, this instructional workbook provides information and exercises applicable to on-the-job situations encountered by independent business owner/managers. Unit I provides…

  1. Research Projects, Technical Reports and Publications

    NASA Technical Reports Server (NTRS)

    Oliger, Joseph

    1996-01-01

    The Research Institute for Advanced Computer Science (RIACS) was established by the Universities Space Research Association (USRA) at the NASA Ames Research Center (ARC) on June 6, 1983. RIACS is privately operated by USRA, a consortium of universities with research programs in the aerospace sciences, under contract with NASA. The primary mission of RIACS is to provide research and expertise in computer science and scientific computing to support the scientific missions of NASA ARC. The research carried out at RIACS must change its emphasis from year to year in response to NASA ARC's changing needs and technological opportunities. A flexible scientific staff is provided through a university faculty visitor program, a post doctoral program, and a student visitor program. Not only does this provide appropriate expertise but it also introduces scientists outside of NASA to NASA problems. A small group of core RIACS staff provides continuity and interacts with an ARC technical monitor and scientific advisory group to determine the RIACS mission. RIACS activities are reviewed and monitored by a USRA advisory council and ARC technical monitor. Research at RIACS is currently being done in the following areas: Advanced Methods for Scientific Computing High Performance Networks During this report pefiod Professor Antony Jameson of Princeton University, Professor Wei-Pai Tang of the University of Waterloo, Professor Marsha Berger of New York University, Professor Tony Chan of UCLA, Associate Professor David Zingg of University of Toronto, Canada and Assistant Professor Andrew Sohn of New Jersey Institute of Technology have been visiting RIACS. January 1, 1996 through September 30, 1996 RIACS had three staff scientists, four visiting scientists, one post-doctoral scientist, three consultants, two research associates and one research assistant. RIACS held a joint workshop with Code 1 29-30 July 1996. The workshop was held to discuss needs and opportunities in basic research in

  2. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  3. The Ecuador Project. Technical Note No. 1.

    ERIC Educational Resources Information Center

    Evans, David; Hoxeng, James

    This report describes the basic goals, philosophy, and methodology of a rural non-formal education project designed to develop and disseminate educational materials in Ecuador. The majority of the population lives in rural settings where facilities are severely limited and the few learning resources seldom relate to the experience of rural…

  4. Minewater heat recovery project. Final Technical report

    SciTech Connect

    1992-04-01

    This report consists of three sections: (1) Design, experimental testing and performance analysis of the 20-ft long DBHE (Downhole Bundle Heat Exchanger); (2) Modified design of mine water heat exchanger; and (3) Performance tests on mine water heat exchanger. Appendices summarize design calculations, discuss the scope of the work tasks, and present a diary of the progress throughout the research and development project.

  5. Some technical issues in managing PCBs.

    PubMed

    Qi, Zhifu; Buekens, Alfons; Liu, Jie; Chen, Tong; Lu, Shengyong; Li, Xiaodong; Cen, Kefa

    2014-05-01

    Polychlorinated biphenyls (PCBs) were important industrial chemicals featuring high thermal and chemical stability and low flammability. They were widely used as dielectric and thermal fluid in closed electro-technical applications (transformers, capacitors…) and also in numerous dispersive uses, ranking from auto-copying paper to sealant or coatings. During the 1960s, severe environmental consequences started becoming apparent. The stability of PCBs contributed to their persistence in the environment, their lipophilic character to bio-magnification. Fish-eating species seemed threatened in their existence. In Japan and in Taiwan, thousands of people consumed PCB-contaminated oil. The production of PCBs stopped completely during the 1980s. Usage could continue in closed applications only. In this paper, particular attention is given to two issues: the cleaning of PCB electric transformers and the potential impact of PCB-containing building materials. Other contributions will cover the management and treatment of PCB-contaminated soil, sludge or fly ash. The complete survey is being prepared by request of the Knowledge Center for Engineers and Professionals. PMID:23812787

  6. Recommendations for improvements to program and project management

    SciTech Connect

    Not Available

    1994-01-01

    Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

  7. Managing MDO Software Development Projects

    NASA Technical Reports Server (NTRS)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  8. Building a Sustainable Project Management Capacity in Cyprus

    ERIC Educational Resources Information Center

    Kelly, Steven J.; Esque, Timm J.; Novak, M. Mari; Cermakova, Anna

    2012-01-01

    The performance-driven project management program examined in this article was funded to support a variety of technical assistance efforts designed to strengthen the performance of small and medium enterprises in the Turkish Cypriot community in Cyprus. The customized program combined progressive workshops with hands-on and distance coaching by…

  9. Update on Service Management project

    ScienceCinema

    None

    2011-04-25

    GS and IT Service Management project status meeting -------------------------------------------------------------------------- Distribution: Sigurd Lettow, Frederic Hemmer, Thomas Pettersson, David Foster, Matti Tiirakari, GS⁢ Service Providers When and where: Thursday 2nd September at 10:00-11:30 in IFiltration Plant (222-R-001) Dear All, We would like to inform you about progress made on different topics like the Service Catalogue, the new Service Management Tool and the Service Desk. We would also like to present the plan for when we hope to "go live" and what this will mean for all of you running and providing services today. We will need your active support and help in the coming months to make this happen. GS⁢ Service Management Teams Reinoud Martens, Mats Moller

  10. Update on Service Management project

    SciTech Connect

    2011-02-28

    GS and IT Service Management project status meeting -------------------------------------------------------------------------- Distribution: Sigurd Lettow, Frederic Hemmer, Thomas Pettersson, David Foster, Matti Tiirakari, GS⁢ Service Providers When and where: Thursday 2nd September at 10:00-11:30 in IFiltration Plant (222-R-001) Dear All, We would like to inform you about progress made on different topics like the Service Catalogue, the new Service Management Tool and the Service Desk. We would also like to present the plan for when we hope to "go live" and what this will mean for all of you running and providing services today. We will need your active support and help in the coming months to make this happen. GS⁢ Service Management Teams Reinoud Martens, Mats Moller

  11. Ocean Thermal Energy Conversion Project: OTEC support services. Monthly technical status report, October 1-31, 1980

    SciTech Connect

    1980-11-14

    The objective of this project is to provide technical engineering and management support services for the Ocean Thermal Energy Conversion (OTEC) program of the Division of Ocean Energy Systems, DOE. The principal contributions made are outlined for the following tasks: (1) Survey, analysis and recommendation concerning program performance; (2) Program technical monitoring; (3) Technical assessments; (4) OTEC system integration; (5) Environment and siting considerations; and (6) Transmission subsystem considerations.

  12. Technical Staffing Crises and Managing Systems Projects

    ERIC Educational Resources Information Center

    Davis, Charles K.

    2007-01-01

    Case method teaching is not limited to larger, complex cases. It is often useful to supplement classroom discussions with short cases, ones that have been targeted for one or two discussion points that challenge student thinking beyond the usual lecture or textbook. These shorter cases are called "minicases." The objective of a minicase is to…

  13. Breakthrough Propulsion Physics Project: Project Management Methods

    NASA Technical Reports Server (NTRS)

    Millis, Marc G.

    2004-01-01

    To leap past the limitations of existing propulsion, the NASA Breakthrough Propulsion Physics (BPP) Project seeks further advancements in physics from which new propulsion methods can eventually be derived. Three visionary breakthroughs are sought: (1) propulsion that requires no propellant, (2) propulsion that circumvents existing speed limits, and (3) breakthrough methods of energy production to power such devices. Because these propulsion goals are presumably far from fruition, a special emphasis is to identify credible research that will make measurable progress toward these goals in the near-term. The management techniques to address this challenge are presented, with a special emphasis on the process used to review, prioritize, and select research tasks. This selection process includes these key features: (a) research tasks are constrained to only address the immediate unknowns, curious effects or critical issues, (b) reliability of assertions is more important than the implications of the assertions, which includes the practice where the reviewers judge credibility rather than feasibility, and (c) total scores are obtained by multiplying the criteria scores rather than by adding. Lessons learned and revisions planned are discussed.

  14. UMTRA project technical assistance contractor quality assurance implementation plan

    SciTech Connect

    Not Available

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

  15. An Approach to Tailoring Major Technical Reviews Based on Project Characteristics and Stakeholder Interests

    NASA Technical Reports Server (NTRS)

    Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.

    2004-01-01

    There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.

  16. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... loan are entitled to the grievance and appeal rights contained in 7 CFR part 3560, subpart D or... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As...

  17. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... loan are entitled to the grievance and appeal rights contained in 7 CFR part 3560, subpart D or... 7 Agriculture 15 2011-01-01 2011-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As...

  18. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... loan are entitled to the grievance and appeal rights contained in 7 CFR part 3560, subpart D or... 7 Agriculture 15 2014-01-01 2014-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As...

  19. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... loan are entitled to the grievance and appeal rights contained in 7 CFR part 3560, subpart D or... 7 Agriculture 15 2013-01-01 2013-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As...

  20. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... loan are entitled to the grievance and appeal rights contained in 7 CFR part 3560, subpart D or... 7 Agriculture 15 2012-01-01 2012-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As...

  1. Project Management; Part 1--The Soft Skills.

    ERIC Educational Resources Information Center

    Bailey, Harold J.; Ergott, Kathleen A.

    1998-01-01

    Presents the first of a three-part series of articles on the life of a project manager. Discussion in Part 1 deals with the people and related skills involved in the project, including: interrelationships between the client, project manager, and executive management; oral, written, and body-language communication forms; and planning and…

  2. Finance and supply management project execution plan

    SciTech Connect

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  3. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor)

    1994-01-01

    This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

  4. Project Management Plan (PMP) for Work Management Implementation

    SciTech Connect

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  5. Total Quality Management Is Total at Fox Valley Technical College.

    ERIC Educational Resources Information Center

    Tyler, Carol R.

    1993-01-01

    At Fox Valley Technical College (Wisconsin), application of Total Quality Management (TQM) brought positive outcomes and other effects. Areas in which TQM was used are considered, including admissions, employee safety, customer focus, policy formation, management performance appraisal, student services, creation of a self-managing class, TQM for…

  6. Project Management Plan for the INEL technology logic diagrams

    SciTech Connect

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ``Technology Logic Diagrams For The INEL.`` The work on this project will be conducted by personnel in EG&G Idaho, Inc.`s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

  7. Project Management Plan for the INEL technology logic diagrams

    SciTech Connect

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

  8. The Effect of Technical Assistance on Involvement and Use: The Case of a Research, Evaluation, and Technical Assistance Project

    ERIC Educational Resources Information Center

    Roseland, Denise; Volkov, Boris B.; Callow-Heusser, Catherine

    2011-01-01

    In contrast to typical National Science Foundation program evaluations, the Utah State Math Science Partnership-Research, Evaluation and Technical Assistance Project (MSP-RETA) provided technical assistance (TA) in two forms: direct TA for up to 10 projects a year, and professional development sessions for a larger number of project staff. Not…

  9. Technical Assistance Project for the Minnesota Pollution Control Agency

    SciTech Connect

    Vimmerstedt, L.

    2006-12-01

    This report was prepared in response to a request for technical assistance from the Minnesota Pollution Control Agency (MPCA). The U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy supported the National Renewable Energy Laboratory (NREL) in its response to this request through the Technical Assistance Project. Discussion with the MPCA identified the following as the highest-priority questions: What is the effect of (1) size of Renewable Energy Reserve (RER) and (2) duration of allocation award on (a) NOx emissions in Minnesota and (b) retail electricity prices? What data is available on the response of wind energy development to financial incentives? This report addresses those questions.

  10. Project management practices in engineering university

    NASA Astrophysics Data System (ADS)

    Sirazitdinova, Y.; Dulzon, A.; Mueller, B.

    2015-10-01

    The article presents the analysis of usage of project management methodology in Tomsk Polytechnic University, in particular the experience with the course Project management which started 15 years ago. The article presents the discussion around advantages of project management methodology for engineering education and administration of the university in general and the problems impeding extensive implementation of this methodology in teaching, research and management in the university.

  11. Ohio Business Management. Technical Competency Profile (TCP).

    ERIC Educational Resources Information Center

    Ray, Gayl M.; Wilson, Nick; Mangini, Rick

    This document describes the essential competencies from secondary through post-secondary associate degree programs for a career in business management. Ohio College Tech Prep Program standards are described, and a key to profile codes is provided. Sample occupations in this career area, such as management trainee, product manager, and advertising…

  12. The Environmental Management Project Manager`s Handbook for improved project definition

    SciTech Connect

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook.

  13. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    SciTech Connect

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  14. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1990-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  15. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1991-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  16. Technical Report of Accomplishments of the Weatherization Leveraging Partnership Project

    SciTech Connect

    Economic Opportunity Studies

    2007-09-30

    The Weatherization Leveraging Partnership Project was established to provide three types of technical assistance support to W.A.P. network organizations seeking to achieve the Weatherization Plus goal of expanding their non-federal resources. It provided: (1) Analysis that profiled W.A.P.-eligible household energy characteristics and finances for all in determining efficiency investment targets and goals; (2) Detailed information on leveraged partnerships linked from many sources and created a website with finding aids to meet the needs the network identified. There are five major market segments with related, but different, technical assistance needs; (3) Direct, sustained assistance in preparing strategies, analyses, and communications for a limited set of local network initiatives that were in early stages of initiating or changing their resource expansion strategies. The Project identified trends in the challenges that weatherizers initiatives encountered; it designed materials and tools, including the dynamic www.weatherizationplus.org website, to meet the continuing and the emerging needs.

  17. Basic Project Management Methodologies for Survey Researchers.

    ERIC Educational Resources Information Center

    Beach, Robert H.

    To be effective, project management requires a heavy dependence on the document, list, and computational capability of a computerized environment. Now that microcomputers are readily available, only the rediscovery of classic project management methodology is required for improved resource allocation in small research projects. This paper provides…

  18. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  19. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  20. Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement

    SciTech Connect

    1994-03-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  1. Yucca Mountain Site Characterization Project technical data catalog quarterly supplement

    SciTech Connect

    1995-03-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with t requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to@ previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  2. Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement

    SciTech Connect

    1994-12-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  3. Yucca Mountain Site Characterization Project Technical Data Catalog (Quarterly supplement)

    SciTech Connect

    1993-12-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  4. Yucca Mountain Site Characterization Project Technical Data Catalog (quarterly supplement)

    SciTech Connect

    1993-06-30

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated December 31, 1992, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1993.

  5. Status of Project Management Education in Pakistan

    ERIC Educational Resources Information Center

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  6. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Project management. 418.29 Section 418.29....29 Project management. In addition to the provisions of § 418.28, if the District is found to be... management of the diversion and outlet works (Derby Dam and Lahontan Dam/Reservoir) or any or all of...

  7. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Project management. 418.29 Section 418.29....29 Project management. In addition to the provisions of § 418.28, if the District is found to be... management of the diversion and outlet works (Derby Dam and Lahontan Dam/Reservoir) or any or all of...

  8. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Project management. 418.29 Section 418.29....29 Project management. In addition to the provisions of § 418.28, if the District is found to be... management of the diversion and outlet works (Derby Dam and Lahontan Dam/Reservoir) or any or all of...

  9. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Project management. 418.29 Section 418.29....29 Project management. In addition to the provisions of § 418.28, if the District is found to be... management of the diversion and outlet works (Derby Dam and Lahontan Dam/Reservoir) or any or all of...

  10. Shawmut hydroelectric redevelopment project. Final technical and construction cost report

    SciTech Connect

    1982-08-01

    This report describes the major steps undertaken by the Central Maine Power Company to redevelop an old existing lowhead (19 to 23 ft) hydroelectric station and, at the same time, demonstrate the commercial viability of such a venture. The report addresses the process of site selection, preliminary conceptual design for determining economic viability, licensing and the regulatory process, final design, and project construction with the objective of presenting to the reader a technical and economical guide useful for a similar undertaking.

  11. Management Studies Educational Knowledge: Technical, Elite or Political?

    ERIC Educational Resources Information Center

    Hordern, Jim

    2014-01-01

    This paper draws on the technical, elite and political interpretations of the purpose of management, to identify demands for particular forms of educational knowledge in the management studies curriculum. The varied character of this knowledge is discussed using Bernsteinian concepts of verticality, grammaticality, classification and framing, and…

  12. The Office of Environmental Management technical reports: a bibliography

    SciTech Connect

    1997-07-01

    The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995 through Sept. 30, 1996. This information is divided into the following categories: Focus Areas and Crosscutting Programs. Support Programs, Technology Integration and International Technology Exchange are now included in the General category. EM`s Office of Science and Technology sponsors this bibliography.

  13. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    SciTech Connect

    Gelles, C. M.; Sheppard, F. R.

    2002-02-26

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

  14. 1993 DOE technical standards managers workshop: Proceedings

    SciTech Connect

    Not Available

    1993-12-31

    This workshop is focused on the benefits of the DOE technical standards program, which is focused toward the preferred use of non-Government standards for DOE activities and the development of DOE technical standards when non-Government standards are not available or are inappropriate. One goal of the program is to replace redundant site-specific standards with more universally accepted documents that have been scrutinized by experts. This replacement is discussed at the workshop along with the problems encountered and solutions found. The workshop provided an opportunity for geographically dispersed people to meet and advance their standards knowledge and efforts to support the program. Safety issues have been the driving force behind the program to date. Several companies offer products and services that support the development, processing, and retrieval of standards. This document mostly comprise vugraphs.

  15. Amine Swingbed Payload Project Management

    NASA Technical Reports Server (NTRS)

    Walsch, Mary; Curley, Su

    2013-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the Orion Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the Orion vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6 ]person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload-the swingbed unit itself-launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open -loop Orion application as well as the closed-loop ISS application.

  16. Amine Swingbed Payload Project Management

    NASA Technical Reports Server (NTRS)

    Hayley, Elizabeth; Curley, Su; Walsh, Mary

    2011-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the ORION Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the ORION vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6-person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload the swingbed unit itself launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open-loop ORION application as well as the closed-loop ISS application.

  17. The Office of Environmental Management technical reports: A bibliography

    SciTech Connect

    1998-07-01

    The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995--that were published from October 1, 1996--September 30, 1997. This information is divided into the following categories: Miscellaneous, Focus Areas and Crosscutting Programs, Support Programs, Technology Integration and International Technology Exchange, are now included in the Miscellaneous category. The Office of Environmental Management within the Department of Energy (DOE) is responsible for environmental restoration, waste management, technology development and facility transition and management. Subjects include: subsurface contaminants; mixed waste characterization, treatment and disposal; radioactive tank waste remediation; plutonium; deactivation and decommissioning; robotics; characterization, monitoring, and sensor technology; and efficient separations. 880 refs.

  18. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    SciTech Connect

    Wecks, M.D.

    1998-04-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  19. Integrated design and management of complex and fast track projects

    NASA Astrophysics Data System (ADS)

    Mancini, Dario

    2003-02-01

    Modern scientific and technological projects are increasingly in competition over scientific aims, technological innovation, performance, time and cost. They require a dedicated and innovative organization able to satisfy contemporarily various technical and logistic constraints imposed by the final user, and guarantee the satisfaction of technical specifications, identified on the basis of scientific aims. In order to satisfy all the above, the management has to be strategically innovative and intuitive, by removing, first of all, the bottlenecks that are pointed out, usually only at the end of the projects, as the causes of general dissatisfaction. More than 30 years spent working on complex multidisciplinary systems and 20 years of formative experience in managing contemporarily both scientific, technological and industrial projects have given the author the possibility to study, test and validate strategies for parallel project management and integrated design, merged in a sort of unique optimized task, using the newly-coined word "Technomethodology". The paper highlights useful information to be taken into consideration during project organization to minimize the program deviations from the expected goals and describe some of the basic meanings of this new advanced method that is the key for parallel successful management of multiple and interdisciplinary activities.

  20. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  1. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1992-01-01

    This volume is the fifth in an ongoing series on aerospace project management at NASA. Articles in this volume cover: an overview of the project cycle; SE&I management for manned space flight programs; shared experiences from NASA Programs and Projects - 1975; cost control for Mariner Venus/Mercury 1973; and the Space Shuttle - a balancing of design and politics. A section on resources for NASA managers rounds out the publication.

  2. Is your organization project management savvy?

    PubMed

    Wolff, Pam

    2003-01-01

    As corporations struggle to gain better control and use of organizational resources in a rapidly changing business environment, they're finding that project management is an efficacious discipline for supporting strategic initiatives and achieving business goals. Successful project management requires an understanding of the business drivers, the organizational structure, the benefits of centralizing project management, and the factors that could impact performance. PMID:12553221

  3. Toward an expert project management system

    NASA Technical Reports Server (NTRS)

    Silverman, Barry G.; Murray, Arthur; Diakite, Coty; Feggos, Kostas

    1987-01-01

    The purpose of the research effort is to prescribe a generic reusable shell that any project office can install and customize for the purposes of advising, guiding, and supporting project managers in that office. The prescribed shell is intended to provide both: a component that generates prescriptive guidance for project planning and monitoring activities, and an analogy (intuition) component that generates descriptive insights of previous experience of successful project managers. The latter component is especially significant in that it has the potential to: retrieve insights, not just data, and provide a vehicle for expert PMs to easily transcribe their current experiences in the course of each new project managed.

  4. Management of citation verification requests for multiple projects at Sandia National Laboratories

    SciTech Connect

    Crawford, C.S.

    1995-12-31

    Sandia National Laboratories` (SNL) Technical Library is now responsible for providing citation verification management support for all references cited in technical reports issued by the Nuclear Waste Management (NWM) Program. This paper dancing how this process is managed for the Yucca Mountain Site Characterization (YWP), Waste Isolation Pilot Plant (WIPP), Idaho National Engineering Laboratory (INEL), and Greater Confinement Disposal (GCD) projects. Since technical reports are the main product of these projects, emphasis is placed on meeting the constantly evolving needs of these customers in a timely and cost-effective manner.

  5. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1988-01-01

    This collection of papers and resources on aerospace management issues is inspired by a desire to benefit from the lessons learned from past projects and programs. Inherent in the NASA culture is a respect for divergent viewpoints and innovative ways of doing things. This publication presents a wide variety of views and opinions. Good management is enhanced when program and project managers examine the methods of veteran managers, considering the lessons they have learned and reflected on their own guiding principles.

  6. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1989-01-01

    This new collection of papers on aerospace management issues contains a history of NASA program and project management, some lessons learned in the areas of management and budget from the Space Shuttle Program, an analysis of tools needed to keep large multilayer programs organized and on track, and an update of resources for NASA managers. A wide variety of opinions and techniques are presented.

  7. Spent Nuclear Fuel Project dose management plan

    SciTech Connect

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts.

  8. Spent Nuclear Fuel Project technical baseline document. Fiscal year 1995: Volume 1, Baseline description

    SciTech Connect

    Womack, J.C.; Cramond, R.; Paedon, R.J.

    1995-03-13

    This document is a revision to WHC-SD-SNF-SD-002, and is issued to support the individual projects that make up the Spent Nuclear Fuel Project in the lower-tier functions, requirements, interfaces, and technical baseline items. It presents results of engineering analyses since Sept. 1994. The mission of the SNFP on the Hanford site is to provide safety, economic, environmentally sound management of Hanford SNF in a manner that stages it to final disposition. This particularly involves K Basin fuel, although other SNF is involved also.

  9. Admiralty Inlet Pilot Tidal Project Final Technical Report

    SciTech Connect

    Collar, Craig

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  10. Procedures and technical methods for transit-project planning

    SciTech Connect

    Ryan, J.M.; Emerson, D.J.; Thomas, E.L.; Mowll, K.U.; Ossi, A.J.

    1990-01-01

    The guidance is specifically designed for State and local agencies that are considering the implementation of fixed guideway transit projects--new rail systems, rail extensions, busways, and the like--with Urban Mass Transit Administration (UMTA) funds. Familiarity with the guidance is essential for all individuals involved in conducting an alternatives analysis involving new or extended heavy rail, light rail or busway projects for which UMTA funding is being contemplated. The guidance may also be of interest to local and State officials who are anxious to understand the Federal perspective on major investments and the type and amount of work which will be done by their staff and consultants to satisfy UMTA's alternatives analysis requirement. The guidance is divided into three major parts: The Major Capital Investment Planning Process; Conduct of the Technical Analysis; and The Decisionmaking Process. The manual also contains a series of appendices which bring together the most important regulations, policy statements, and other information relevant to project planning.

  11. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  12. Report-reading patterns of technical managers and nonmanagers

    NASA Technical Reports Server (NTRS)

    Pinelli, T. E.; Cordle, V. M.; Glassman, M.; Vondran, R. F., Jr.

    1984-01-01

    A survey to determine the review and reading processes used by technical managers and nonmanagers indicates that the summary, abstract, conclusion, title page, and introduction are the components used most frequently by both groups to decide whether to read a NASA technical report. In the review process, significantly more managers than nonmanagers use the summary and conclusion, whereas significantly more nonmanagers use the abstract and title page. The most common sequence of review consists of the title page, abstract, and summary, in that order, for both groups. In the reading process, the conclusion, results and discussion, and summary are the components read by the highest percentage of both groups.

  13. Managing Technical Change: The Human Side.

    ERIC Educational Resources Information Center

    Evertson, Carolyn; Stallings, Jane

    1985-01-01

    In some sense, technology may be a stampede that tramples humanistic values taught in schools. There must be sensitivity not only to technology and changes it will bring, but to requirements for change relative to people's beliefs, perceptions, and actions in school settings. Teachers need to be effectively trained in management and educational…

  14. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    SciTech Connect

    Golder Associates, Inc.

    2003-04-22

    the planning effort leading to this Master Plan, a Technical Working Group (TWG) was established that represents most, if not all, fish and wildlife agencies/interests in the subbasin. This TWG met regularly throughout the planning process to provide input and review and was instrumental in the development of this plan. Preparation of this plan included the development of a quantitative prioritization process to rank 40,000 parcels within the Urban Growth Area based on the value of fish and wildlife habitat each parcel provided. Biological and physical criteria were developed and applied to all parcels through a GIS-based prioritization model. In the second-phase of the prioritization process, the TWG provided local expert knowledge and review of the properties. In selecting the most critical areas within the Urban Growth Area for protection, this project assessed the value of fish and wildlife habitat on the Yakima River. Well-developed habitat acquisition efforts (e.g., Yakima River Basin Water Enhancement Project by the Bureau of Reclamation and Yakama Nation acquisition projects) are already underway on the Yakima River mainstem. These efforts, however, face several limitations in protection of floodplain function that could be addressed through the support of the Yakima Habitat Improvement Project. This Master Plan integrates tributary habitat acquisition efforts with those ongoing on the Yakima River to best benefit fish and wildlife in the Urban Growth Area. The parcel ranking process identified 25 properties with the highest fish and wildlife value for habitat acquisition in the Yakima Urban Area. These parcels contain important fish and wildlife corridors on Ahtanum and Wide Hollow Creeks and the Naches River. The fifteen highest-ranking parcels of the 25 parcels identified were considered very high priority for protection of fish and wildlife habitat. These 15 parcels were subsequently grouped into four priority acquisition areas. This Master Plan outlines a

  15. 76 FR 67400 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    .... SUPPLEMENTARY INFORMATION: On September 13, 2011, FTA published an NPRM in the Federal Register (76 FR 56363-81... TRANSPORTATION Federal Transit Administration 49 CFR Part 633 RIN 2132-AA92 Capital Project Management AGENCY... Capital Project Management to December 2, 2011, to allow interested parties time to carefully review...

  16. NASA Technical Management Report (533Q)

    NASA Technical Reports Server (NTRS)

    Klosko, S. M.; Sanchez, B. (Technical Monitor)

    2001-01-01

    The objective of this task is analytical support of the NASA Satellite Laser Ranging (SLR) program in the areas of SLR data analysis, software development, assessment of SLR station performance, development of improved models for atmospheric propagation and interpretation of station calibration techniques, and science coordination and analysis functions for the NASA led Central Bureau of the International Laser Ranging Service (ILRS). The contractor shall in each year of the five year contract: (1) Provide software development and analysis support to the NASA SLR program and the ILRS. Attend and make analysis reports at the monthly meetings of the Central Bureau of the ILRS covering data received during the previous period. Provide support to the Analysis Working Group of the ILRS including special tiger teams that are established to handle unique analysis problems. Support the updating of the SLR Bibliography contained on the ILRS web site; (2) Perform special assessments of SLR station performance from available data to determine unique biases and technical problems at the station; (3) Develop improvements to models of atmospheric propagation and for handling pre- and post-pass calibration data provided by global network stations; (4) Provide review presentation of overall ILRS network data results at one major scientific meeting per year; (5) Contribute to and support the publication of NASA SLR and ILRS reports highlighting the results of SLR analysis activity.

  17. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    ERIC Educational Resources Information Center

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  18. Putting the Q into Quality Project Management

    ERIC Educational Resources Information Center

    Lockitt, Bill

    2007-01-01

    Project management covers a wide range of skills and is one of the best forms of staff development available for the development of skills by doing. This publication is for the use of staff involved in e-learning development projects. An introduction and overview includes discussion of e-learning projects in general and why they are undertaken;…

  19. Native American Technical Assistance and Training for Renewable Energy Resource Development and Electrical Generation Facilities Management

    SciTech Connect

    A. David Lester

    2008-10-17

    The Council of Energy Resource Tribes (CERT) will facilitate technical expertise and training of Native Americans in renewable energy resource development for electrical generation facilities, and distributed generation options contributing to feasibility studies, strategic planning and visioning. CERT will also provide information to Tribes on energy efficiency and energy management techniques.This project will provide facilitation and coordination of expertise from government agencies and private industries to interact with Native Americans in ways that will result in renewable energy resource development, energy efficiency program development, and electrical generation facilities management by Tribal entities. The intent of this cooperative agreement is to help build capacity within the Tribes to manage these important resources.

  20. Ohio Medical Office Management. Technical Competency Profile (TCP).

    ERIC Educational Resources Information Center

    Ray, Gayl M.; Wilson, Nick; Mangini, Rick

    This document provides a framework for a broad-based secondary and postsecondary curriculum to prepare students for employment in medical office management. The first part of the technical competency profile (TCP) contains the following items: an explanation of the purpose and scope of Ohio's TCPs; college tech prep program standards; an overview…

  1. Ohio Marketing Management and Research. Technical Competency Profile (TCP).

    ERIC Educational Resources Information Center

    Ray, Gayl M.; Wilson, Nick; Mangini, Rick

    This document provides a framework for a broad-based secondary and postsecondary curriculum to prepare students for employment in marketing management and research (MMR). The first part of the technical competency profile (TCP) contains the following items: an explanation of the purpose and scope of Ohio's TCPs; college tech prep program…

  2. Total Quality Management in Vocational-Technical Education.

    ERIC Educational Resources Information Center

    Moore-Norman Vo-Tech Center, Norman, OK.

    A study was conducted to provide vocational educators with resources regarding implementation of Total Quality Management (TQM). Data were gathered through development of a bibliography of resources; a survey of all Oklahoma vocational-technical schools regarding specific industries in their area using TQM components (10 responses); and site…

  3. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... management and accountability of funds as indicated in 44 CFR part 13. The State is responsible for ensuring... in 44 CFR part 13 apply to all grant assistance provided under this subpart. FEMA may elect to... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management....

  4. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management and accountability of funds as indicated in 44 CFR part 13. The State is responsible for ensuring... in 44 CFR part 13 apply to all grant assistance provided under this subpart. FEMA may elect to... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Project management....

  5. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management and accountability of funds as indicated in 44 CFR part 13. The State is responsible for ensuring... in 44 CFR part 13 apply to all grant assistance provided under this subpart. FEMA may elect to... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project management....

  6. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management and accountability of funds as indicated in 44 CFR part 13. The State is responsible for ensuring... in 44 CFR part 13 apply to all grant assistance provided under this subpart. FEMA may elect to... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project management....

  7. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management and accountability of funds as indicated in 44 CFR part 13. The State is responsible for ensuring... in 44 CFR part 13 apply to all grant assistance provided under this subpart. FEMA may elect to... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Project management....

  8. The PMI local site demonstration project: lessons in technical assistance.

    PubMed

    Strand, J; Rosenbaum, J; Hanlon, E; Jimerson, A

    2000-03-01

    This paper presents the lessons that were learned in technical assistance during the Preventive Marketing Initiative local site demonstration project in the US. The program has been ongoing for 5 years, with social marketers from the Academy for Educational Development and Porter Novelli using social marketing and behavioral science principles to develop HIV prevention programs for and with local teens. With the success of the program, community-based prevention programs are increasingly being requested since better outcomes resulted from a few dollars of investment. Likewise, funders and prevention researchers were challenged to transfer state-of-the-art prevention technologies for communities to apply it readily. The success achieved by the project, however, provides important lessons that would save time and money for future community-based Prevention Marketing efforts. Among the lessons were the need to seek out or establish conditions in the community that are conducive to success, as well as the need to offer technical assistance that would mobilize communities in developing more effective Prevention Marketing programs. PMID:12349591

  9. Oak Ridge National Laboratory Facilities Revitalization Project - Project Management Plan

    SciTech Connect

    Myrick, T.E.

    2000-06-06

    The Facilities Revitalization Project (FRP) has been established at Oak Ridge National Laboratory (ORNL) to provide new and/or refurbished research and support facilities for the Laboratory's science mission. The FRP vision is to provide ORNL staff with world-class facilities, consolidated at the X-10 site, with the first phase of construction to be completed within five years. The project will utilize a combination of U.S. Department of Energy (DOE), State of Tennessee, and private-sector funds to accomplish the new construction, with the facilities requirements to be focused on support of the ORNL Institutional Plan. This FRP Project Management Plan has been developed to provide the framework under which the project will be conducted. It is intended that the FRP will be managed as a programmatic office, with primary resources for execution of the project to be obtained from the responsible organizations within ORNL (Engineering, Procurement, Strategic Planning, etc.). The FRP Project Management Plan includes a definition of the project scope, the organizational responsibilities, and project approach, including detailed Work Breakdown Structure (WBS), followed by more detailed discussions of each of the main WBS elements: Project Planning Basis, Facility Deactivation and Consolidation, and New Facilities Development. Finally, a general discussion of the overall project schedule and cost tracking approach is provided.

  10. Final Technical Report - Kotzebue Wind Power Project - Volume II

    SciTech Connect

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  11. Tucson Solar Village: Project management

    SciTech Connect

    Not Available

    1991-11-01

    The Tucson Solar Village is a Design/Build Project In Sustainable Community Development which responds to a broad spectrum of energy, environmental, and economic challenges. This project is designed for 820 acres of undeveloped State Trust Land within the Tucson city limits; residential population will be five to six thousand persons with internal employment provided for 1200. This is a 15 year project (for complete buildout and sales) with an estimated cost of $500 million. Details of the project are addressed with emphasis on the process and comments on its transferability.

  12. Engineering data management: Experience and projections

    NASA Technical Reports Server (NTRS)

    Jefferson, D. K.; Thomson, B.

    1978-01-01

    Experiences in developing a large engineering data management system are described. Problems which were encountered are presented and projected to future systems. Business applications involving similar types of data bases are described. A data base management system architecture proposed by the business community is described and its applicability to engineering data management is discussed. It is concluded that the most difficult problems faced in engineering and business data management can best be solved by cooperative efforts.

  13. Agile Project Management for e-Learning Developments

    ERIC Educational Resources Information Center

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  14. Report format preferences of technical managers and nonmanagers

    NASA Technical Reports Server (NTRS)

    Pinelli, T. E.; Cordle, V. M.; Glassman, M.; Vondran, R. F., Jr.

    1984-01-01

    A survey of engineers and scientists concerning the format of NASA technical reports indicates that a summary as well as an abstract should be included, that the definitions of symbols and glossary of terms should be located in the front of the report, and that the illustrative material should be integrated with the text rather than grouped at the end of the report. Citation of references by number, one-column, ragged-right-margin layout, and third-person writing style are also preferred by a majority of the respondents. The preferences of managers and nonmanagers are very similar for all aspects of technical report format covered by the survey.

  15. Virtual reality and project management for astronomy

    NASA Astrophysics Data System (ADS)

    Martínez, L. A.; Villarreal, J. L.; Angeles, F.; Bernal, A.; Bribiesca, E.; Flores, R.

    2010-07-01

    Over the years astronomical instrumentation projects are becoming increasingly complex making necessary to find efficient ways for project communication management. While all projects share the need to communicate project information, the required information and the methods of distribution vary widely between projects and project staff. A particular problem experienced on many projects regardless of their size, is related to the amount of design, planning information and how that is distributed among the project stakeholders. One way to improve project communications management is to use a workflow that offers a predefined way to share information in a project. Virtual Reality (VR) offers the possibility to get a visual feedback of designed components without the expenses of prototype building, giving an experience that mimics real life situations using a computer. In this contribution we explore VR as a communication technology that helps to manage instrumentation projects by means of a workflow implemented on a software package called Discut designed at Universidad Nacional Autónoma de Mexico (UNAM). The workflow can integrate VR environments generated as CAD models.

  16. Risk Management on the National Compact Stellarator Project (NCSX)

    SciTech Connect

    Risk Management on the National Compact Stellarator Project

    2009-02-06

    In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a "first-of-a-kind" fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project.

  17. Risk management integration into complex project organizations

    NASA Technical Reports Server (NTRS)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  18. [Managing digital medical imaging projects in healthcare services: lessons learned].

    PubMed

    Rojas de la Escalera, D

    2013-01-01

    Medical imaging is one of the most important diagnostic instruments in clinical practice. The technological development of digital medical imaging has enabled healthcare services to undertake large scale projects that require the participation and collaboration of many professionals of varied backgrounds and interests as well as substantial investments in infrastructures. Rather than focusing on systems for dealing with digital medical images, this article deals with the management of projects for implementing these systems, reviewing various organizational, technological, and human factors that are critical to ensure the success of these projects and to guarantee the compatibility and integration of digital medical imaging systems with other health information systems. To this end, the author relates several lessons learned from a review of the literature and the author's own experience in the technical coordination of digital medical imaging projects. PMID:22944485

  19. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  20. The Malvern Project. Technical Report. Closed Circuit Television in Secondary Schools.

    ERIC Educational Resources Information Center

    Hawkins, Bernard

    The technical details of the Malvern Project--an Australian instructional television project--are discussed. Section I offers a statement of the technical performance of the main items of equipment used in the project and also includes the full details of the overall circuit plans, modifications made to items of equipment, and the system adopted…

  1. Technical Data Catalog: Yucca Mountain Site Characterization Project. Quarterly supplement

    SciTech Connect

    1995-06-30

    This report presents reference information contained in the Yucca Mountain Project Automated Technical Data Tracking System. The Department of Energy is seeking to design and maintain a geologic repository for the disposal of high-level radioactive wastes. However, before this repository can be built, the DOE must first do a comprehensive site evaluation. This evaluation is subject to many regulations. This report fulfills the reporting requirements of the Site-Specific Procedural Agreement for Geologic Repository to develop and maintain a catalog of data which will be updated and provided to the Nuclear Regulatory Commission on a quarterly basis. This catalog contains: description of data; time, place, and method of acquisition; and where data may be examined.

  2. SUPERFUND TECHNICAL SUPPORT

    EPA Science Inventory

    Under this task, technical support is provided to Regional Remedial Project Managers (RPMs)/On-Scene Coordinators (OSCs) at Superfund, RCRA, and Brownfields sites contaminated with hazardous materials by the Technical Support Center (TSC) for Monitoring and Site Characterization....

  3. Geothermal energy projects - Planning and management

    SciTech Connect

    Goodman, L.J.; Love, R.N.

    1980-01-01

    A presentation is made of management requirements for the development of geothermal resources by citing three major, and successful, projects: the Wairakei geothermal power project of New Zealand, the Hawaii geothermal project of the United States, and the Tiwi geothermal project of the Philippines. The three case studies are presented according to a format in which the history of each project falls into four phases: (1) planning, appraisal and design (2) section, approval and activation (3) operation, control and handover and (4) evaluation and refinement. Each case study furnishes extensive performance and economic figures, along with consideration of such related issues as geothermal effluent chemical content, infrastructural requirements, and environmental impact.

  4. Cultural differences in Research project management

    NASA Astrophysics Data System (ADS)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  5. Project Management Support and Services for the Environmental Restoration and Waste Management. Final report

    SciTech Connect

    1995-04-10

    The Los Alamos National Laboratory (LANL) Environmental Restoration Technical Support Office (ERTSO) contracted Project Time & Cost, Inc. (PT&C) on 16 November 1992 to provide support services to the US Department of Energy (DOE). ERTSO had traditionally supported the DOE Albuquerque office in the Environmental Restoration and Waste Management Programs and had also supported the Office of Waste Management (EM-30) at DOE Headquarters in Germantown, Maryland. PT&C was requested to provide project management and support services for the DOE as well as liaison and coordination of responses and efforts between various agencies. The primary objective of this work was to continue LANL`s technical support role to EM-30 and assist in the development of the COE Cost and Schedule Estimating (CASE) Guide for EM-30. PT&C`s objectives, as specified in Section B of the contract, were well met during the duration of the project through the review and comment of various draft documents, trips to DOE sites providing program management support and participating in the training for the EM-30 Cost and Schedule Estimating Guide, drafting memos and scheduling future projects, attending numerous meetings with LANL, DOE and other subcontractors, and providing written observations and recommendations.he results obtained were determined to be satisfactory by both the LANL ERTSO and DOE EM-30 organizations. The objective to further the support from LANL and their associated subcontractor (PT&C) was met. The contract concluded with no outstanding issues.

  6. Graduate Student Project: Employer Operations Management Analysis

    ERIC Educational Resources Information Center

    Fish, Lynn A.

    2008-01-01

    Part-time graduate students at an Association to Advance Collegiate Schools of Business-accredited college complete a unique project by applying operations management concepts to their current employer. More than 92% of 368 graduates indicated that this experiential project was a positive learning experience, and results show a positive impact on…

  7. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    NASA Astrophysics Data System (ADS)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  8. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1993-01-01

    This volume is the sixth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  9. INTERIOR COLUMBIA BASIN ECOSYSTEM MANAGEMENT PROJECT (ICBEMP)

    EPA Science Inventory

    A geographic information system (GIS) spatial data library is maintained through the Interior Columbia Basin Ecosystem Management Project. Sponsored by the Bureau of Land Management, the library contains more than 200 products which include the following types of data: aquatic, a...

  10. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor); Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1995-01-01

    This volume is the ninth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  11. "Project Management Controls with Systems."

    ERIC Educational Resources Information Center

    Dell' Isola, A. J.

    There have recently been a number of new concepts introduced into the building industry to reduce building costs. In this speech, the author illustrates how three of these new concepts -- construction management, building systems, and value engineering -- can be combined to effect significant reduction in both the initial and the ownership costs…

  12. Program/project management resource lists

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Program/Project Management Collection at NASA Headquarters Library is part of a larger initiative by the Training and Development Division, Code FT, NASA Headquarters. The collection is being developed to support the Program/Project Management Initiative which includes the training of NASA managers. These PPM Resource Lists have proven to be a useful method of informing NASA employees nationwide about the subject coverage of the library collection. All resources included on the lists are available at or through NASA Headquarters Library. NASA employees at other Centers may request listed books through interlibrary loan, and listed articles by contacting me by phone, mail, or e-mail.

  13. Technical Area V (TA-V) transformation project close-out report.

    SciTech Connect

    Not Available

    2010-07-01

    Sandia National Laboratories (SNL) Technical Area V (TA-V) has provided unique nuclear experimental environments for decades. The technologies tested in TA-V facilities have furthered the United States Nuclear Weapons program and has contributed to the national energy and homeland security mission. The importance of TA-V working efficiently to produce an attractive and effective platform for experiments should not be underestimated. Throughout its brief history, TA-V has evolved to address multiple and diverse sets of requirements. These requirements evolved over many years; however, the requirements had not been managed nor communicated comprehensively or effectively. A series of programmatic findings over several years of external audits was evidence of this downfall. Today, these same requirements flow down through a new TA-V management system that produces consistently applied and reproducible approaches to work practices. In 2008, the TA-V department managers assessed the state of TA-V services and work activities to understand how to improve customer interfaces, stakeholders perceptions, and workforce efficiencies. The TA-V management team initiated the TA-V Transformation Project after they deemed the pre-June 2008 operational model to be ineffective in managing work and in providing integrated, continuous improvement to TA-V processes. This report summarizes the TA-V Transformation Project goals, activities, and accomplishments.

  14. Fast Flux Test Facility Closure Project - Project Management Plan

    SciTech Connect

    BEACH, R.R.

    2002-09-26

    The Fast Flux Test Facility (FFTF) Closure Project, Project Management Plan, Revision 5, provides the scope, cost, and schedule to achieve the most cost effective and expeditious closure of the FFTF to an assumed final end-state with the reactor vessel and the containment building, below the 5504 grade level, being entombed in place. Closure will be completed by December 2009 at a cost of $547 million.

  15. Diabetes management in OLDES project.

    PubMed

    Novak, D; Uller, M; Rousseaux, S; Mraz, M; Smrz, J; Stepankova, O; Haluzik, M; Busuoli, M

    2009-01-01

    EU project OLDES (Older People's e-services at home) develops easy to use and low cost ICT platform in order to offer a better quality of life to elderly people directly in their homes through innovative systems of tele-accompany, tele-assistance and tele-medicine. The elderly are able to access the services and send relevant medical data from their home by being connected to the central server via a low cost PC which is based on Negroponte paradigm. The OLDES platform interface uses television screens controlled through a remote control customized for the elderly. The feasibility of OLDES project is evaluated by the pilot study concentrating on compensation of diabetic patients. Compensation of diabetes is achieved by monitoring glucose glycemia level, blood pressure and weight. Moreover, the patient feeds into OLDES system daily consumption of food using interactive food scales and obtains advice if necessary. PMID:19965284

  16. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    SciTech Connect

    MCLELLAN, G.W.

    2007-02-07

    permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and inspections, including the construction contractor, CH2M HILL

  17. 15 CFR 292.3 - Technical tools, techniques, practices, and analyses projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Technical tools, techniques, practices, and analyses projects. (a) Eligibility criteria. In general... analyses may be specified in solicitations. Examples of tools, techniques, and practices include, but are... under the Financial Plan criteria. (e) Tools, techniques, practices, and analyses projects...

  18. Environmental restoration and remediation technical data management plan

    SciTech Connect

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit.

  19. Ashtabula Environmental Management Project Main Extrusion Plant Demolition Project. Demolition of the Ashtabula Environmental Management Project's Main Extrusion Plant

    SciTech Connect

    Colborn, Kurt; Johnson, Kathryn K.

    2003-02-27

    Significant progress was made this year toward closure of the Department of Energy's Ashtabula Environmental Management Project (AEMP) with the demolition of the 9-building Main Extrusion Plant Complex. The 44,000 square foot building complex formerly housed uranium extrusion facilities and equipment. At the start of the project in October of 2001, the buildings still contained a RCRA Part B storage area, operating mixed waste treatment facilities, active waste shredding and compacting process areas, and a state EPA permitted HEPA ventilation system. This paper presents a discussion of the multidisciplinary effort to bring the building to a safe shutdown condition in just six months, including relocation of existing process areas, utility isolation, and preliminary decontamination. Also discussed is the demolition strategy in which portions of the facility remained active while demolition was proceeding in other areas. Other details of the technical approach to the demolition are also discussed, including innovative techniques for demolition, galbestos removal, contamination control, and waste minimization. These techniques contributed to the early completion of demolition in July of 2002, fully two months ahead of schedule and $1.5 million under budget.

  20. Non-Profit/Higher Education Project Management Series: Project Management (PM) Foundations

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael B.

    2012-01-01

    This is the first in a series of forum articles on applying project management (PM) techniques and tools to the nonprofit sector with a focus on higher education. The authors will begin with a traditional look at project management because they believe that the integration of the tools and the processes associated with PM into many campus offices…

  1. Project Management: Essential Skill of Nurse Informaticists.

    PubMed

    Sipes, Carolyn

    2016-01-01

    With the evolution of nursing informatics (NI), the list of skills has advanced from the original definition that included 21 competencies to 168 basic competencies identified in the TIGER-based Assessment of Nursing Informatics Competencies (TANIC) and 178 advanced skills in the Nursing Informatics Competency Assessment (NICA) L3/L4 developed by Chamberlain College of Nursing, Nursing Informatics Research Team (NIRT). Of these competencies, project management is one of the most important essentials identified since it impacts all areas of NI skills and provides an organizing framework for processes and projects including skills such as design, planning, implementation, follow-up and evaluation. Examples of job roles that specifically require project management skills as an essential part of the NI functions include management, administration, leadership, faculty, graduate level master's and doctorate practicum courses. But first, better understanding of the NI essential skills is vital before adequate education and training programs can be developed. PMID:27332201

  2. A VIRTUAL TECHNICAL SYSTEMS AUDIT OF RESEARCH QUALITY ASSURANCE AND RECORD MANAGEMENT SYSTEMS IN ORD, U.S EPA

    EPA Science Inventory

    NHEERL conducts technical systems audits (TSAs) on its research projects. The findings are reported by the QA Manager (QAM) to the Director of QA (DQA) as Exemplary Findings (things the QA Team liked); Corrective Actions (things that must be corrected immediately); and Areas for...

  3. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Industrial Physics.

    ERIC Educational Resources Information Center

    Whisenhunt, James E.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour introduction to industrial physics that explains and demonstrates to industrial maintenance mechanics the direct relationship of physics to machinery. Project TEAM is intended to upgrade basic technical competencies of…

  4. Increasing Women's Participation in Technical Fields. A Pilot Project in Africa. Training Discussion Paper No. 90.

    ERIC Educational Resources Information Center

    Leigh-Doyle, Sue

    In 1988, the Commonwealth Association of Polytechnics in Africa (CAPA) in collaboration with the International Labour Organization established a pilot project to address the issue of underrepresentation of women in technical education and training. The Women in Technical Education and Training Project (WITED) was based on six key strategic…

  5. NTRCI Legacy Engine Research and Development Project Final Technical Report

    SciTech Connect

    Smith-Holbert, Connie; Petrolino, Joseph; Watkins, Bart; Irick, David

    2011-12-31

    The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engine's commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was

  6. Promoting gender parity in basic education: Lessons from a technical cooperation project in Yemen

    NASA Astrophysics Data System (ADS)

    Yuki, Takako; Mizuno, Keiko; Ogawa, Keiichi; Mihoko, Sakai

    2013-06-01

    Many girls are not sent to school in Yemen, despite basic education being free as well as compulsory for all children aged 6-15. Aiming to improve girls' enrolment by increasing parental and community involvement, the Japan International Cooperation Agency (JICA) offered a technical cooperation project in June 2005 called Broadening Regional Initiative for Developing Girls' Education (BRIDGE). Phase 1 of this project ran for three and a half years, piloting a participatory school management model supported by school grants in six districts of the Taiz Governorate in the Southwest of Yemen. To find out how successful this approach has been in a traditional society, the authors of this paper analysed the gender parity index (GPI) of the project's pilot schools. Based on data collected at three points in time (in the initial and final years of the project, and two years after the project's end), their findings suggest that interventions in school management which strongly emphasise girls' education can be effective in improving gender parity rather quickly, regardless of the schools' initial conditions. However, the authors also observe that the pilot schools' post-project performance in terms of gender parity is mixed. While the local government allocated budgets for school grants to all pilot schools even after the project's end, training and monitoring activities were cut back. The authors further observe that the variation in performance appears to be significantly correlated with school leaders' initial perceptions of gender equality and with the number of female teachers employed. These findings point to the importance of providing schools with continuous long-term guidance and of monitoring those which implement school improvement programmes.

  7. The PI-Mode of Project Management

    NASA Technical Reports Server (NTRS)

    Isaac, Dan

    1997-01-01

    The PI-Mode is NASA's new approach to project management. It responds to the Agency's new policy to develop scientific missions that deliver the highest quality science for a fixed cost. It also attempts to provide more research opportunities by reducing project development times and increasing the number of launches per year. In order to accomplish this, the Principal Investigator is placed at the helm of the project with full responsibility over all aspects of the mission, including instrument and spacecraft development, as well as mission operations and data analysis. This paper intends to study the PI-Mode to determine the strengths and weaknesses of such a new project management technique. It also presents an analysis of its possible impact on the scientific community and its relations with industry, NASA, and other institutions.

  8. Technical approach for the management of UMTRA ground water investigation-derived wastes

    SciTech Connect

    Not Available

    1994-02-01

    During characterization, remediation, or monitoring activities of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project, ground water samples are collected to assess the extent and amount of waterborne contamination that might have come from the mill tailings. This sampling sometimes occurs in contaminated areas where ground water quality has been degraded. Ground water sampling activities may result in field-generated wastes that must be disposed of in a manner protective of human health and the environment. During ground water sampling, appropriate measures must be taken to dispose of presampling purge water and well development water that is pumped to flush out any newly constructed wells. Additionally, pumping tests may produce thousands of gallons of potentially contaminated ground water that must be properly managed. In addition to the liquid wastes, there is the potential for bringing contaminated soils to the ground surface during the drilling and installation of water wells in areas where the subsurface soils may be contaminated. These soils must be properly managed as well. This paper addresses the general technical approach that the UMTRA Project will follow in managing field-generated wastes from well drilling, development, sampling, and testing. It will provide guidance for the preparation of Technical Assistance Contractor (TAC) Standard Operating Procedures (SOP) for the management and disposal of field-generated wastes from ground water monitoring and remediation activities.

  9. Cesium legacy safety project management work plan

    SciTech Connect

    Durham, J.S.

    1998-04-21

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell).

  10. International Project Management Committee: Overview and Activities

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward

    2010-01-01

    This slide presentation discusses the purpose and composition of the International Project Management Committee (IMPC). The IMPC was established by members of 15 space agencies, companies and professional organizations. The goal of the committee is to establish a means to share experiences and best practices with space project/program management practitioners at the global level. The space agencies that are involved are: AEB, DLR, ESA, ISRO, JAXA, KARI, and NASA. The industrial and professional organizational members are Comau, COSPAR, PMI, and Thales Alenia Space.

  11. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance for Geothermal Resource Evaluation Projects

    SciTech Connect

    Robert P. Breckenridge; Thomas R. Wood; Joel Renner

    2010-09-01

    The purpose of this document is to report on the evaluation of geothermal resource potential on and around three different United States (U. S.) Air Force Bases (AFBs): Nellis AFB and Air Force Range (AFR) in the State of Nevada (see maps 1 and 5), Holloman AFB in the State of New Mexico (see map 2), and Mountain Home AFB in the State of Idaho (see map 3). All three sites are located in semi-arid parts of the western U. S. The U. S. Air Force, through its Air Combat Command (ACC) located at Langley AFB in the State of Virginia, asked the Federal Energy Management Program (FEMP) for technical assistance to conduct technical and feasibility evaluations for the potential to identify viable geothermal resources on or around three different AFBs. Idaho National Laboratory (INL) is supporting FEMP in providing technical assistance to a number of different Federal Agencies. For this report, the three different AFBs are considered one project because they all deal with potential geothermal resource evaluations. The three AFBs will be evaluated primarily for their opportunity to develop a geothermal resource of high enough quality grade (i.e., temperature, productivity, depth, etc.) to consider the possibility for generation of electricity through a power plant. Secondarily, if the resource for the three AFBs is found to be not sufficient enough for electricity generation, then they will be described in enough detail to allow the base energy managers to evaluate if the resource is suitable for direct heating or cooling. Site visits and meetings by INL personnel with the staff at each AFB were held in late FY-2009 and FY-2010. This report provides a technical evaluation of the opportunities and challenges for developing geothermal resources on and around the AFBs. An extensive amount of literature and geographic information was evaluated as a part of this assessment. Resource potential maps were developed for each of the AFBs.

  12. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    SciTech Connect

    Not Available

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  13. Technical Communications in Aeronautics: Results of an Exploratory Study. An Analysis of Profit Managers' and Nonprofit Managers' Responses. NASA Technical Memorandum 101626.

    ERIC Educational Resources Information Center

    Pinelli, Thomas E.; And Others

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that profit and nonprofit managers in the aerospace community have different technical communications practices. Profit and nonprofit managers were compared in five…

  14. New Technical Risk Management Development for Carbon Capture Process

    SciTech Connect

    Engel, David W.; Letellier, Bruce; Edwards, Brian; Leclaire, Rene; Jones, Edward

    2012-04-30

    The basic CCSI objective of accelerating technology development and commercial deployment of carbon capture technologies through the extensive use of numerical simulation introduces a degree of unfamiliarity and novelty that potentially increases both of the traditional risk elements. In order to secure investor confidence and successfully accelerate the marketability of carbon capture technologies, it is critical that risk management decision tools be developed in parallel with numerical simulation capabilities and uncertainty quantification efforts. The focus of this paper is on the development of a technical risk model that incorporates the specific technology maturity development (level).

  15. General technical considerations for the endovascular management of cerebral aneurysms.

    PubMed

    Eboli, Paula; Ryan, Robert W; Alexander, Michael J

    2014-07-01

    Cerebral aneurysms pose a threat to patients because of their risk of rupture causing subarachnoid hemorrhage, and the goal of treatment is the exclusion of the aneurysm from the circulation to prevent bleeding (in the case of unruptured aneurysms) or rebleeding. This article analyzes the general technical factors associated with the endovascular treatment of cerebral aneurysms. It discusses issues with transarterial access; imaging of aneurysm size, morphology, and regional anatomy to determine the endovascular plan; the techniques for the major endovascular aneurysm devices; and periprocedural management issues to reduce potential treatment-related complications. PMID:24994079

  16. SP-100, a project manager's view

    NASA Technical Reports Server (NTRS)

    Truscello, Vincent C.

    1983-01-01

    Born to meet the special needs of America's space effort, the SP-100 Program testifies to the cooperation among government agencies. The Department of Energy (DOE), the National Aeronautics and Space Administration (NASA), and the Defense Advanced Research Projects Agency (DARPA) are working together to produce a 100-kW power system for use in outer space. At this point in the effort, it is appropriate to review: The approach to meet program goals; the status of activities of the Project Office, managed by the Jet Propulsion Laboratory (JPL); and, because this is a meeting on materials, answers beings developed by the Project Office to vital questions on refractory alloy technology.

  17. The NCC project: A quality management perspective

    NASA Technical Reports Server (NTRS)

    Lee, Raymond H.

    1993-01-01

    The Network Control Center (NCC) Project introduced the concept of total quality management (TQM) in mid-1990. The CSC project team established a program which focused on continuous process improvement in software development methodology and consistent deliveries of high quality software products for the NCC. The vision of the TQM program was to produce error free software. Specific goals were established to allow continuing assessment of the progress toward meeting the overall quality objectives. The total quality environment, now a part of the NCC Project culture, has become the foundation for continuous process improvement and has resulted in the consistent delivery of quality software products over the last three years.

  18. Project Management in NASA: The system and the men

    NASA Technical Reports Server (NTRS)

    Pontious, R. H.; Barnes, L. B.

    1973-01-01

    An analytical description of the NASA project management system is presented with emphasis on the human element. The NASA concept of project management, program managers, and the problems and strengths of the NASA system are discussed.

  19. Technical Communications in Aeronautics: Results of an Exploratory Study. An Analysis of Managers' and Nonmanagers' Responses. NASA Technical Memorandum 101625.

    ERIC Educational Resources Information Center

    Pinelli, Thomas E.; And Others

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that aerospace managers and nonmanagers have different technical communications practices. Five secondary assumptions were established for the analysis: (1) that the…

  20. NEW HAMPSHIRE ESTUARIES PROJECT MANAGEMENT PLAN, 2000

    EPA Science Inventory

    The Comprehensive Conservation and Management Plan of the New Hampshire Estuaries Project presents a broad framework and specific list of actions to protect and enhance the environmental quality of the estuaries of the State of New Hampshire. It is intended to be a guide for all ...

  1. MSFC Propulsion Systems Department Knowledge Management Project

    NASA Technical Reports Server (NTRS)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  2. Learning the ABCs (of Project Management)

    NASA Technical Reports Server (NTRS)

    Frandsen, Allan

    2003-01-01

    To lead a project effectively, one has to establish and maintain the flexibility to take appropriate actions when needed. Overconstrained situations should be avoided. To get on top of matters and stay there, a manager needs to anticipate what it will take to successfully complete the job. Physical and financial resources, personnel, and management structure are all important considerations. Carving out the necessary turf up front can make a world of difference to the project's outcome. After the "what," "where," and "when" of a project are nailed down, the next question is "how" to do the job. When I first interviewed for the job of Science Payload Manager on the Advanced Composition (ACE) Explorer mission, Dr. Edward Stone (ACE Principal Investigator) asked, "Al, give me an idea of your management style." It was a question I had not considered before. I thought about it for a few seconds and then answered, "Well, the first descriptive term that comes to mind is the word "tranquility". That seemed to startle him. So I added, "I guess what I mean is, that if the situation is tranquil and the project is running smoothly, then I've anticipated all the problems and taken necessary actions to head them off." He then asked: "Have you ever reached this state?" "No," I admitted, "but I strive for it." That seemed to satisfy him because I got the job.

  3. Project Management Approaches for Online Learning Design

    ERIC Educational Resources Information Center

    Eby, Gulsun; Yuzer, T. Volkan

    2013-01-01

    Developments in online learning and its design are areas that continue to grow in order to enhance students' learning environments and experiences. However, in the implementation of new technologies, the importance of properly and fairly overseeing these courses is often undervalued. "Project Management Approaches for Online Learning Design"…

  4. 76 FR 56363 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... September 1, 1989, at 49 CFR part 633 (54 FR 36708). At the time, UMTA's capital programs were comparatively... agency published on September 10, 2009, at 74 FR 46515-21. This proposed rule would transform the current... Federal Transit Administration 49 CFR Part 633 RIN 2132-AA92 Capital Project Management AGENCY:...

  5. NEW HAMPSHIRE ESTUARIES PROJECT MANAGEMENT PLAN

    EPA Science Inventory

    This Comprehensive Conservation and Management Plan of the New Hampshire Estuaries Project presents a broad framework and specific list of actions to protect and enhance the environmental quality of the estuaries of the State of New Hampshire. It is intended to be a guide for all...

  6. Building a Propulsion Experiment Project Management Environment

    NASA Technical Reports Server (NTRS)

    Keiser, Ken; Tanner, Steve; Hatcher, Danny; Graves, Sara

    2004-01-01

    What do you get when you cross rocket scientists with computer geeks? It is an interactive, distributed computing web of tools and services providing a more productive environment for propulsion research and development. The Rocket Engine Advancement Program 2 (REAP2) project involves researchers at several institutions collaborating on propulsion experiments and modeling. In an effort to facilitate these collaborations among researchers at different locations and with different specializations, researchers at the Information Technology and Systems Center,' University of Alabama in Huntsville, are creating a prototype web-based interactive information system in support of propulsion research. This system, to be based on experience gained in creating similar systems for NASA Earth science field experiment campaigns such as the Convection and Moisture Experiments (CAMEX), will assist in the planning and analysis of model and experiment results across REAP2 participants. The initial version of the Propulsion Experiment Project Management Environment (PExPM) consists of a controlled-access web portal facilitating the drafting and sharing of working documents and publications. Interactive tools for building and searching an annotated bibliography of publications related to REAP2 research topics have been created to help organize and maintain the results of literature searches. Also work is underway, with some initial prototypes in place, for interactive project management tools allowing project managers to schedule experiment activities, track status and report on results. This paper describes current successes, plans, and expected challenges for this project.

  7. AVLIS Production Plant Project Management Plan

    SciTech Connect

    Not Available

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  8. The Computer Science Technical Report (CS-TR) Project: A Pioneering Digital Library Project Viewed from a Library Perspective.

    ERIC Educational Resources Information Center

    Anderson, Greg; And Others

    1996-01-01

    Describes the Computer Science Technical Report Project, one of the earliest investigations into the system engineering of digital libraries which pioneered multiinstitutional collaborative research into technical, social, and legal issues related to the development and implementation of a large, heterogeneous, distributed digital library. (LRW)

  9. Implementation of quality management in early stages of research and development projects at a university.

    PubMed

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects. PMID:24523303

  10. A New Tool for Effective and Efficient Project Management

    SciTech Connect

    Willett, Jesse A

    2011-12-01

    Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

  11. DEPLETED URANIUM TECHNICAL WORK

    EPA Science Inventory

    The Depleted Uranium Technical Work is designed to convey available information and knowledge about depleted uranium to EPA Remedial Project Managers, On-Scene Coordinators, contractors, and other Agency managers involved with the remediation of sites contaminated with this mater...

  12. Experiences in managing the Prometheus Project

    NASA Technical Reports Server (NTRS)

    Lehman, David H.; Clark, Karla B.; Cook, Beverly A.; Gavit, Sarah A.; Kayali, Sammy A.; McKinney, John C.; Milkovich, David C.; Reh, Kim R.; Taylor, Randall L.; Casani, John R.

    2006-01-01

    Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

  13. Data analysis and management for the Uranium Resource Evaluation Project

    SciTech Connect

    Kane, V.E.

    1980-01-01

    The Department of Energy has funded a large data collection effort with the purpose of determining the US uranium resources. This Uranium Resource Evaluation (URE) Project required a large data management effort which involved collection, retrieval, processing, display, and analysis of large volumes of data. Many of the characteristics of this data processing system are relevant to other applications, particularly where routine processing involves analyses for input into numerous technical reports. The URE Project computing system has a modular program structure which has enabled a straightforward interface with both special and general graphics and analysis packages such as SAS, BMDP, and SURFACE II. Other topics include cost-effective computing, data quality, report quality computer output, and test versus production program development.

  14. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    ERIC Educational Resources Information Center

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  15. Agent-Based Simulations for Project Management

    NASA Technical Reports Server (NTRS)

    White, J. Chris; Sholtes, Robert M.

    2011-01-01

    Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

  16. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  17. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  18. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  19. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  20. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  1. Uganda's National Transmission Backbone Infrastructure Project: Technical Challenges and the Way Forward

    NASA Astrophysics Data System (ADS)

    Bulega, T.; Kyeyune, A.; Onek, P.; Sseguya, R.; Mbabazi, D.; Katwiremu, E.

    2011-10-01

    Several publications have identified technical challenges facing Uganda's National Transmission Backbone Infrastructure project. This research addresses the technical limitations of the National Transmission Backbone Infrastructure project, evaluates the goals of the project, and compares the results against the technical capability of the backbone. The findings of the study indicate a bandwidth deficit, which will be addressed by using dense wave division multiplexing repeaters, leasing bandwidth from private companies. Microwave links for redundancy, a Network Operation Center for operation and maintenance, and deployment of wireless interoperability for microwave access as a last-mile solution are also suggested.

  2. 75 FR 62809 - Transmission Vegetation Management Practices; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... Energy Regulatory Commission Transmission Vegetation Management Practices; Notice of Technical Conference... Technical Conference on Transmission Vegetation Management Programs on Tuesday, October 26, 2010 from 1 p.m... attend the conference. The purpose of the conference is to discuss current vegetation management...

  3. NASA's Cryogenic Fluid Management Technology Project

    NASA Technical Reports Server (NTRS)

    Tramel, Terri L.; Motil, Susan M.

    2008-01-01

    The Cryogenic Fluid Management (CFM) Project's primary objective is to develop storage, transfer, and handling technologies for cryogens that will support the enabling of high performance cryogenic propulsion systems, lunar surface systems and economical ground operations. Such technologies can significantly reduce propellant launch mass and required on-orbit margins, reduce or even eliminate propellant tank fluid boil-off losses for long term missions, and simplify vehicle operations. This paper will present the status of the specific technologies that the CFM Project is developing. The two main areas of concentration are analysis models development and CFM hardware development. The project develops analysis tools and models based on thermodynamics, hydrodynamics, and existing flight/test data. These tools assist in the development of pressure/thermal control devices (such as the Thermodynamic Vent System (TVS), and Multi-layer insulation); with the ultimate goal being to develop a mature set of tools and models that can characterize the performance of the pressure/thermal control devices incorporated in the design of an entire CFM system with minimal cryogen loss. The project does hardware development and testing to verify our understanding of the physical principles involved, and to validate the performance of CFM components, subsystems and systems. This database provides information to anchor our analytical models. This paper describes some of the current activities of the NASA's Cryogenic Fluid Management Project.

  4. Technical-economic modelling of integrated water management: wastewater reuse in a French island.

    PubMed

    Xu, P; Valette, F; Brissaud, F; Fazio, A; Lazarova, V

    2001-01-01

    An integrated technical-economic model is used to address water management issues in the French island of Noirmoutier. The model simulates potable water production and supply, potable and non potable water demand and consumption, wastewater collection, treatment and disposal, water storage, transportation and reuse. A variety of water management scenarios is assessed through technical, economic and environmental evaluation. The scenarios include wastewater reclamation and reuse for agricultural and landscape irrigation as well as domestic non potable application, desalination of seawater and brackish groundwater for potable water supply. The study shows that, in Noirmoutier, wastewater reclamation and reuse for crop irrigation is the most cost-effective solution to the lack of water resources and the protection of sensitive environment. Some water management projects which are regarded as having less economic benefit in the short-term may become competitive in the future, as a result of tightened environmental policy, changed public attitudes and advanced water treatment technologies. The model provides an appropriate tool for water resources planning and management. PMID:11436805

  5. Quantitative Understanding to Enhance Social Science Teaching. Project QUESST: Technical Report.

    ERIC Educational Resources Information Center

    Educational Resources Center, Inc., Boulder, CO.

    This technical project report provides the National Science Foundation with information regarding the substantive achievements of the Social Science Education Consortium's project QUESST (Quantitative Understanding To Enhance Social Science Teaching). The report begins with a discussion of materials development and project publicity. Thirty-three…

  6. Technical Assistance for Single Parent Homemaker Projects in Kentucky. Annual Report.

    ERIC Educational Resources Information Center

    Louisville Univ., KY. School of Education.

    During fiscal year 1990, the single parent/displaced homemaker project was monitored at the University of Louisville (Kentucky), and assistance was provided to the project directors. The method of inquiry and the results are discussed in this report. Communication with project directors was increased by visits from a technical assistant,…

  7. Evaluation of Title I ESEA Projects, 1974-75: Technical Reports. Report No. 7606.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    Technical reports of individual Title I project evaluations conducted during the 1974-75 school year are contained in this annual volume. It presents information about each project's rationale, expected outcomes, mode of operation, previous evaluative findings, current implementation, and attainment of its objectives. Projects included are:…

  8. International Socio-Technical Challenges for Geological Disposal (InSOTEC): Project Aims and Preliminary Results - 12236

    SciTech Connect

    Bergmans, Anne; Schroeder, Jantine; Simmons, Peter; Barthe, Yannick; Meyer, Morgan; Sundqvist, Goeran; Martell, Merixell; Kallenbach-Herbert, Beate

    2012-07-01

    InSOTEC is a social sciences research project which aims to generate a better understanding of the complex interplay between the technical and the social in radioactive waste management and, in particular, in the design and implementation of geological disposal. It currently investigates and analyses the most striking socio-technical challenges to implementing geological disposal of radioactive waste in 14 national programs. A focus is put on situations and issues where the relationship between the technical and social components is still unstable, ambiguous and controversial, and where negotiations are taking place in terms of problem definitions and preferred solutions. Such negotiations can vary from relatively minor contestation, over mild commotion, to strong and open conflicts. Concrete examples of socio-technical challenges are: the question of siting, introducing the notion of reversibility / retrievability into the concept of geological disposal, or monitoring for confidence building. In a second stage the InSOTEC partners aim to develop a fine-grained understanding of how the technical and the social influence, shape, build upon each other in the case of radioactive waste management and the design and implementation of geological disposal. How are socio-technical combinations in this field translated and materialized into the solutions finally adopted? With what kinds of tools and instruments are they being integrated? Complementary to providing better theoretical insight into these socio-technical challenges/combinations, InSOTEC aims to provide concrete suggestions on how to address these within national and international contexts. To this end, InSOTEC will deliver insights into how mechanisms for interaction between the technical community and a broad range of socio-political actors could be developed. (authors)

  9. LLNL/YMP Waste Container Fabrication and Closure Project; GFY technical activity summary

    SciTech Connect

    1990-10-01

    The Department of Energy`s Office of Civilian Radioactive Waste Management (OCRWM) Program is studying Yucca Mountain, Nevada as a suitable site for the first US high-level nuclear waste repository. Lawrence Livermore National Laboratory (LLNL) has the responsibility for designing and developing the waste package for the permanent storage of high-level nuclear waste. This report is a summary of the technical activities for the LLNL/YMP Nuclear Waste Disposal Container Fabrication and Closure Development Project. Candidate welding closure processes were identified in the Phase 1 report. This report discusses Phase 2. Phase 2 of this effort involved laboratory studies to determine the optimum fabrication and closure processes. Because of budget limitations, LLNL narrowed the materials for evaluation in Phase 2 from the original six to four: Alloy 825, CDA 715, CDA 102 (or CDA 122) and CDA 952. Phase 2 studies focused on evaluation of candidate material in conjunction with fabrication and closure processes.

  10. Field research tasks and technical services. Project status report, June 1-August 31, 1982

    SciTech Connect

    1982-09-01

    Emphasis was placed on analysis efforts for passive design tools, industry review of the initial performance monitoring data on the 160 hot water systems that are under test, and the work concerned with residential PV systems. Of particular importance was the completion of a report covering analysis of residential PV systems integrated with on-site thermal storage. This work shows that some advantage may result in hot, humid climates where there is more of a load balance throughout the year because of the relatively constant cooling load. Effort was started on the evaluation of completed Midwest AT projects, analysis from a management viewpoint, and preparation for more detailed monitoring and technical assistance to grantees. A listing of documents produced during the reporting period is included and materials defining the work which was accomplished are provided.

  11. Decision making and senior management: the implementation of change projects covering clinical management in SUS hospitals.

    PubMed

    Pacheco, José Márcio da Cunha; Gomes, Romeu

    2016-08-01

    This paper analyses the decision making process for senior management in public hospitals that are a part of the National Health Service in Brazil (hereafter SUS) in relation to projects aimed at changing clinical management. The methodological design of this study is qualitative in nature taking a hermeneutics-dialectics perspective in terms of results. Hospital directors noted that clinical management projects changed the state of hospitals through: improving their organizations, mobilizing their staff in order to increase a sense of order and systemizing actions and available resources. Technical rationality was the principal basis used in the decision making process for managers. Due to the reality of many hospitals having fragmented organizations, this fact impeded the use of aspects related to rationality, such as economic and financial factors in the decision making process. The incremental model and general politics also play a role in this area. We concluded that the decision making process embraces a large array of factors including rational aspects such as the use of management techniques and the ability to analyze, interpret and summarize. It also incorporates subjective elements such as how to select values and dealing with people's working experiences. We recognized that management problems are wide in scope, ambiguous, complex and do not come with a lot of structure in practice. PMID:27557021

  12. Correlational Study of Risk Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  13. Approaches to Teaching: Adapting Cases in Operations Management for Use in the Technical Writing Classroom.

    ERIC Educational Resources Information Center

    Morrow, John

    1988-01-01

    Describes how technical writing teachers can adapt existing operations management cases for the writing classroom by recognizing communication gaps and filling them with appropriate writing scenarios. (ARH)

  14. Project T.E.A.M. (Technical Education Advancement Modules). Fundementals of Workplace Integration.

    ERIC Educational Resources Information Center

    Kraeling, Vicki

    This module is one of a series of instructional guides developed by Project TEAM (Technical Education Advancement Modules), a cooperative demonstration program for high technology training for unemployed, underemployed, and existing industrial employees whose basic technical skills are in need of upgrading. The module is a 27-hour overview course…

  15. Design Study for Project on Standard Operating Procedures for Technical Library Services.

    ERIC Educational Resources Information Center

    Libbey, Miles A.; And Others

    The overall objective of the Technical Information Support Activities (TISA) Project is the production of a "Post Commander's Handbook." The handbook will be instrumental in achieving greater utilization of available technical information resources to assist army scientists and engineers engaged in the support of army combat and other operating…

  16. 76 FR 50201 - National Early Childhood Technical Assistance Center; Final Extension of Project Period and Waiver

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... National Early Childhood Technical Assistance Center; Final Extension of Project Period and Waiver AGENCY... Early Childhood Technical Assistance Center to receive funding from October 1, 2011 through September 30.... SUPPLEMENTARY INFORMATION: On June 7, 2011, the Department published a notice in the Federal Register (76...

  17. River Protection Project waste feed delivery program technical performance measurement assessment plan

    SciTech Connect

    O'TOOLE, S.M.

    1999-09-30

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle.

  18. A Practical Demonstration Project in Teaching Technical Mathematics; Final Progress Report.

    ERIC Educational Resources Information Center

    McHale, Thomas J.; Witzke, Paul T.

    The primary purposes of this developmental and demonstration project were to reduce the number of dropouts and failures and to increase the amount of learning in the technical mathematics core courses. In June 1965 a decision was made to pilot test locally developed programed units in technical mathematics. After the identification of the desired…

  19. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    SciTech Connect

    Sebastian Puente

    1998-07-25

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics.

  20. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes. PMID:15682672

  1. Spent Nuclear Fuel Project document control and Records Management Program Description

    SciTech Connect

    MARTIN, B.M.

    2000-05-18

    The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document.

  2. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect

    Burritt, James G.; Berkey, Edgar

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  3. Technical Projects: Understanding Teamwork Satisfaction in an Introductory IS Course

    ERIC Educational Resources Information Center

    Napier, Nannette P.; Johnson, Roy D.

    2007-01-01

    Information Systems (IS) projects are increasingly staffed by cross-functional teams working together to solve complex tasks. To better prepare students for this business reality, higher education institutions need to integrate team projects within their courses. Despite good intentions, these team projects do not always have the desired outcomes.…

  4. A Demonstrated Prioritization Model for Curriculum Development in Alabama's Vocational-Technical Education System. (Vocational Education Curriculum Operation--Management Plan) Publication No. 4.

    ERIC Educational Resources Information Center

    Andrews, Glenn; And Others

    One aspect of the State/Federally funded project VO-ED COMP (Vocational Education Curriculum Operation-Management Plan carried out in Alabama during 1978) was the determination of priorities for curricular development and management functions in Alabama's vocational technical education programs. A needs assessment study was made at the 1978…

  5. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Not Available

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  6. Complex socio-technical systems: Characterization and management guidelines.

    PubMed

    Righi, Angela Weber; Saurin, Tarcisio Abreu

    2015-09-01

    Although ergonomics has paid increasing attention to the perspective of complexity, methods for its operationalization are scarce. This study introduces a framework for the operationalization of the "attribute view" of complexity, which involves: (i) the delimitation of the socio-technical system (STS); (ii) the description of four complexity attributes, namely a large number of elements in dynamic interactions, a wide diversity of elements, unexpected variability, and resilience; (iii) the assessment of six management guidelines, namely design slack, give visibility to processes and outcomes, anticipate and monitor the impacts of small changes, monitor the gap between prescription and practice, encourage diversity of perspectives when making decisions, and create an environment that supports resilience; and (iv) the identification of leverage points for improving the STS design, based on both the analysis of relationships among the attributes and their classification as irreducible/manageable complexity, and liability/asset. The use of the framework is illustrated by the study of an emergency department of a University hospital. Data collection involved analysis of documents, observations of work at the front-line, interviews with employees, and the application of questionnaires. PMID:25959314

  7. A Collaborative Writing Project in a Technical Communication Course.

    ERIC Educational Resources Information Center

    Gearhart, Kyle Anne

    1992-01-01

    Cites research showing that many technical writing courses do not give students an accurate conception of the workplace. Notes the importance of communication skills, inadequacies of writers in the workplace, and the need for practice and instruction in collaborative writing. Outlines a one-term course containing a collaborative writing project…

  8. Cluster: Drafting. Course: Basic Technical Drafting. Research Project.

    ERIC Educational Resources Information Center

    Sanford - Lee County Schools, NC.

    The set of six units is designed for use with an instructor in basic technical drafting and is also keyed to other texts. Each unit contains several task packages specifying prerequisites, rationale for learning, objectives, learning activities to be supervised by the instructor, and learning practice. The units cover: pictorial drawing; screw…

  9. Technical Publications as Graduate Class Projects: Advantages and Potential Disadvantages

    ERIC Educational Resources Information Center

    Copenheaver, Carolyn A.; Predmore, S. Andrew; Fuhrman, Nicholas E.

    2016-01-01

    Graduate students are rewarded with better job opportunities if they can demonstrate a productive publishing record. In this article we report on a writing program that generated technical publications in a discipline-based graduate class. Seventeen student authors were interviewed about the influence of the experience on their professional…

  10. Technical management techniques for identification and control of industrial safety and pollution hazards

    NASA Technical Reports Server (NTRS)

    Campbell, R.; Dyer, M. K.; Hoard, E. G.; Little, D. G.; Taylor, A. C.

    1972-01-01

    Constructive recommendations are suggested for pollution problems from offshore energy resources industries on outer continental shelf. Technical management techniques for pollution identification and control offer possible applications to space engineering and management.

  11. Combined sewer overflow: A management study. Technical report

    SciTech Connect

    Reilly, A.

    1988-01-01

    This project is part of the National Network for Environmental Management Studies under the auspices of the Office of Cooperative Environmental Management of the U.S. Environmental Protection Agency. In many older cities in the U.S., the capacity of the combined sewer is exceeded on a daily basis due to both-wet weather storm surges and increased volumes of waste generated by new development. As a result, billions of gallons of untreated sewage are discharged on an annual basis into the nation's marine bays and estuaries in episodes called 'combined sewer overflow.' There are two primary reasons for the increasing frequency and severity of overflow episodes: the population of cities in coastal areas are growing at rates that far exceed the ability of the sewer infrastructure to accommodate them; the built-in inefficiencies of the original design of the combined sewer are being exploited by many municipalities to compensate for the increased volumes of sewage associated with the growth in population. Because each combined sewer, the area that it drains, and the receiving water into which it discharges constitutes a unique system, a management strategy should be site-specific. The document proposes a framework within which a site-specific and cost-effective management strategy may be formulated. By necessity, the emphasis is on providing tools and methods rather than explicit solutions.

  12. AgRISTARS: Foreign commodity production forecasting. Minutes of the annual formal project manager's review, including preliminary technical review reports of FY80 experiments. [wheat/barley and corn/soybean experiments

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The U.S./Canada wheat/barley exploratory experiment is discussed with emphasis on labeling, machine processing using P1A, and the crop calendar. Classification and the simulated aggregation test used in the U.S. corn/soybean exploratory experiment are also considered. Topics covered regarding the foreign commodity production forecasting project include: (1) the acquisition, handling, and processing of both U.S. and foreign agricultural data, as well as meteorological data. The accuracy assessment methodology, multicrop sampling and aggregation technology development, frame development, the yield project interface, and classification for area estimation are also examined.

  13. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are...

  14. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are...

  15. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are...

  16. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are...

  17. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are...

  18. A Symbiosis between Instructional Systems Design and Project Management

    ERIC Educational Resources Information Center

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  19. Management of major system programs and projects. Handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.

  20. Preparing Future Leaders: Project Management Strategies for Service Learning

    ERIC Educational Resources Information Center

    Munger, Roger; Gutowski, Amanda

    2008-01-01

    This article makes a case for teaching project management strategies in service-learning courses. The authors describe three specific documents students can create to help them manage a service-learning project and then present strategies that can help students manage their project teams. Such skills, the authors argue, provide the tools students…

  1. Final Report: Technical Support for Innovative Energy Systems the U.S. Chemical Industry -- Innovative Energy Systems Pilot Project - Chemicals Project Integrator

    SciTech Connect

    John Cuttica - Principal Investigator; Dr Steffen Mueller - Lead Engineer

    2008-10-30

    The University of Illinois at Chicago Energy Resources Center (UIC/ERC) was originally selected to carry out the role of project integrator for a planned solicitation calling for proposals for innovative concepts for energy efficient systems in the chemical industry. The selection was made as a result of a DOE Announcement of Funding Opportunity issued by the DOE Golden Field Office. The U.S. DOE, due to funding constraints, decided to change the role of project integrator into one of technical support to DOE and the Vision 2020 Steering Committee in carrying out the oversight and management of the projects selected from the planned innovative concepts solicitation. This project, initiated in April, 2005, was established to provide that technical support to the U.S. DOE Innovative Energy Systems Pilot Project for the US Chemical Industry. In the late summer of 2006, and as a continuation of the baseline technology analysis conducted by UIC/ERC under this project, DOE requested that UIC/ERC assist in the development of “technology briefs” in support of the DOE Save Energy Now program. The 100 technology briefs developed under this contract were utilized by the Energy Experts as part of their Energy Saving Assessments (ESA).

  2. The Dust Management Project: Final Report

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  3. Data warehouse manages offshore project information

    SciTech Connect

    1998-05-04

    A data warehouse adopted from the POSC/Caesar data model will manage the life-cycle information for the offshore Norway Aasgard project. The Aasgard project comprises the Midgard, Smorbukk, and Smorbukk South fields, which lie in 780--985 ft of water. A semisubmersible production facility will handle gas exports, scheduled to begin in 2000. Statoil estimates that recoverable reserves in the fields are 7.5 tcf of gas and 780 million bbl of oil. Notia software components include: the Intergraph asset and information management (AIM) product; the P/C PDM and P/C RDL models; a data mapping, translation, and import toolkit; the application programming interface (API); and query and browser clients. Intergraph describes AIM, with its object management framework (OMF) from metaphase technology, as the engine upon which Notia is based. The P/C PDM defines the data terminology and structure. A dictionary of standard petrochemical data items, the P/C RDL, defines the various activities, materials, components, and relationships among these items. The API allows users to develop additional functionality, and the toolkit provides resources for translating and mapping data from existing sources into a neutral format so that administrators can prepopulate the data warehouse. A worldwide web browser client allows users to query the data warehouse and display results in a variety of configurable formats, including virtual data sheets.

  4. Managing Complex Distance Education Projects in a Telework Environment

    ERIC Educational Resources Information Center

    Ally, Mohamed; Cleveland-Innes, Marti; Wiseman, Colin

    2010-01-01

    The advances of communication technologies have allowed professionals to work on distance education projects in a telework environment. Managers of these projects must have the skills to manage the projects from a distance. They must be able to select the appropriate team members to work on the project, orient team members, and monitor team…

  5. Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report

    SciTech Connect

    1996-04-30

    The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

  6. Quarterly Technical Progress Report - West Hackberry Tertiary Project

    SciTech Connect

    Bruce Cerveny; Tor Kragas; Travis Gillham

    1997-07-10

    The West Hackberry Tertiary Project is a field test of the concept that air injection can generate tertiary oil recovery through the Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil through gravity discharge. The novel aspect of this project is the use of air as the injection fluid.

  7. Honey Lake Geothermal Project, Lassen County, California. Final technical report

    SciTech Connect

    Not Available

    1984-11-01

    This report discusses the drilling, completion, and testing of deep well WEN-2 for a hybrid electric power project which will use the area's moderate temperature geothermal fluids and locally procured wood fuel. The project is located within the Wendel-Amedee Known Geothermal Resource Area. (ACR)

  8. Hazard Management with DOORS: Rail Infrastructure Projects

    NASA Astrophysics Data System (ADS)

    Hughes, Dave; Saeed, Amer

    LOI is a major rail infrastructure project that will contribute to a modernised transport system in time for the 2012 Olympic Games. A review of the procedures and tool infrastructure was conducted in early 2006, coinciding with a planned move to main works. A hazard log support tool was needed to provide: an automatic audit trial, version control and support collaborative working. A DOORS based Hazard Log (DHL) was selected as the Tool Strategy. A systematic approach was followed for the development of DHL, after a series of tests and acceptance gateways, DHL was handed over to the project in autumn 2006. The first few months were used for operational trials and he Hazard Management rocedure was modified to be a hybrid approach that used the strengths of DHL and Excel. The user experience in the deployment of DHL is summarised and directions for future improvement identified.

  9. Illinois drainage water management demonstration project

    USGS Publications Warehouse

    Pitts, D.J.; Cooke, R.; Terrio, P.J.

    2004-01-01

    Due to naturally high water tables and flat topography, there are approximately 4 million ha (10 million ac) of farmland artificially drained with subsurface (tile) systems in Illinois. Subsurface drainage is practiced to insure trafficable field conditions for farm equipment and to reduce crop stress from excess water within the root zone. Although drainage is essential for economic crop production, there have been some significant environmental costs. Tile drainage systems tend to intercept nutrient (nitrate) rich soil-water and shunt it to surface water. Data from numerous monitoring studies have shown that a significant amount of the total nitrate load in Illinois is being delivered to surface water from tile drainage systems. In Illinois, these drainage systems are typically installed without control mechanisms and allow the soil to drain whenever the water table is above the elevation of the tile outlet. An assessment of water quality in the tile drained areas of Illinois showed that approximately 50 percent of the nitrate load was being delivered through the tile systems during the fallow period when there was no production need for drainage to occur. In 1998, a demonstration project to introduce drainage water management to producers in Illinois was initiated by NRCS4 An initial aspect of the project was to identify producers that were willing to manage their drainage system to create a raised water table during the fallow (November-March) period. Financial assistance from two federal programs was used to assist producers in retrofitting the existing drainage systems with control structures. Growers were also provided guidance on the management of the structures for both water quality and production benefits. Some of the retrofitted systems were monitored to determine the effect of the practice on water quality. This paper provides background on the water quality impacts of tile drainage in Illinois, the status of the demonstration project, preliminary

  10. Risk Management in ETS-8 Project

    NASA Astrophysics Data System (ADS)

    Homma, M.

    2002-01-01

    Engineering Test Satellite - 8 (ETS-8) is the Japanese largest geo-synchronous satellite of 3 tons in mass, of which mission is mobile communications and navigation experiment. It is now in the flight model manufacturing phase. This paper introduces the risk management taken in this project as a reference. The mission success criteria of ETS-8 are described at first. All the risk management activities are planned taking these criteria into consideration. ETS-8 consists of many new technologies such as the large deployable antenna (19m x 17m), 64-bit MPU, 100 V solar paddle and so on. We have to pay attention to control these risk through each phase of development. In system design of ETS - 8, almost components have redundancy and there is some back-up function to avoid fatal failure. What kind of back-up function should be taken is one of the hot issues in this project. The consideration process is described as an actual case. In addition to conventional risk management procedure, FMEA and identification of the critical items so on, we conducted the validation experiment in space by use of a scale model that was launched on Ariane 5. The decision to conduct this kind of experiment is taken after evaluation between risk and cost, because it takes a lot of resources of project. The effect of this experiment is also presented. Failure detection, isolation and reconfiguration in the flight software are more important as the satellite system becomes large and complicated. We did the independent verification and validation to the software. Some remarks are noted with respect to its effectiveness.

  11. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    SciTech Connect

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  12. Project Based Learning experiences in the space engineering education at Technical University of Madrid

    NASA Astrophysics Data System (ADS)

    Rodríguez, Jacobo; Laverón-Simavilla, Ana; del Cura, Juan M.; Ezquerro, José M.; Lapuerta, Victoria; Cordero-Gracia, Marta

    2015-10-01

    This work describes the innovation activities performed in the field of space education since the academic year 2009/10 at the Technical University of Madrid (UPM), in collaboration with the Spanish User Support and Operations Center (E-USOC), the center assigned by the European Space Agency (ESA) in Spain to support the operations of scientific experiments on board the International Space Station. These activities have been integrated within the last year of the UPM Aerospace Engineering degree. A laboratory has been created, where students have to validate and integrate the subsystems of a microsatellite using demonstrator satellites. In parallel, the students participate in a Project Based Learning (PBL) training process in which they work in groups to develop the conceptual design of a space mission. One student in each group takes the role of project manager, another one is responsible for the mission design and the rest are each responsible for the design of one of the satellite subsystems. A ground station has also been set up with the help of students developing their final thesis, which will allow future students to perform training sessions and learn how to communicate with satellites, how to receive telemetry and how to process the data. Several surveys have been conducted along two academic years to evaluate the impact of these techniques in engineering learning. The surveys evaluate the acquisition of specific and generic competences, as well as the students' degree of satisfaction with respect to the use of these learning methodologies. The results of the surveys and the perception of the lecturers show that PBL encourages students' motivation and improves their results. They not only acquire better technical training, but also improve their transversal skills. It is also pointed out that this methodology requires more dedication from lecturers than traditional methods.

  13. Global Software Development Patterns for Project Management

    NASA Astrophysics Data System (ADS)

    Välimäki, Antti; Kääriäinen, Jukka; Koskimies, Kai

    Global software development with the agile or waterfall development process has been taken into use in many companies. GSD offers benefits but also new challenges without known, documented solutions. The goal of this research is to present current best practices for GSD in the form of process patterns for project management, evaluated by using a scenario-based assessment method. The best practices have been collected from a large company operating in process automation. It is expected that the resulting pattern language helps other companies to improve their GSD processes by incorporating the patterns in the processes.

  14. Unique strategies for technical information management at Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Krishen, Vijay

    1994-01-01

    In addition to the current NASA manned programs, the maturation of Space Station and the introduction of the Space Exploration programs are anticipated to add substantially to the number and variety of data and documentation at NASA Johnson Space Center (JSC). This growth in the next decade has been estimated at five to ten fold compared to the current numbers. There will be an increased requirement for the tracking and currency of space program data and documents with National pressures to realize economic benefits from the research and technological developments of space programs. From a global perspective the demand for NASA's technical data and documentation is anticipated to increase at local, national, and international levels. The primary users will be government, industry, and academia. In our present national strategy, NASA's research and technology will assume a great role in the revitalization of the economy and gaining international competitiveness. Thus, greater demand will be placed on NASA's data and documentation resources. In this paper the strategies and procedures developed by DDMS, Inc., to accommodate the present and future information utilization needs are presented. The DDMS, Inc., strategies and procedures rely on understanding user requirements, library management issues, and technological applications for acquiring, searching, storing, and retrieving specific information accurately and quickly. The proposed approach responds to changing customer requirements and product deliveries. The unique features of the proposed strategy include: (1) To establish customer driven data and documentation management through an innovative and unique methods to identify needs and requirements. (2) To implement a structured process which responds to user needs, aimed at minimizing costs and maximizing services, resulting in increased productivity. (3) To provide a process of standardization of services and procedures. This standardization is the central

  15. Project management plan for the Objective Supply Capability Adaptive Redesign (OSCAR) project

    SciTech Connect

    Rasch, K.A.; Reid, R.W.

    1997-02-01

    This document establishes the project management plan for design and development of the Object Supply Capability Adaptive Redesign (OSCAR) Project. The purpose of the project management plan is to document the plans, goals, directions, commitments, approaches, and decisions that relate to guiding a project throughout its life cycle. Special attention is given to project goals, deliverables, sponsor and project standards, project resources, schedule, and cost estimates.

  16. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    SciTech Connect

    Seberger, C.D.; Chargin, A.K.

    1981-10-26

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information.

  17. TECHlinx Technical Education Clearinghouse. Final Report. Project Year 1995-1996.

    ERIC Educational Resources Information Center

    Perry, Pamela; And Others

    This report contains materials from the TECHlinx Technical Education Clearinghouse project designed to promote the effective development of the Texas work force by linking individuals and institutions to information and resources focused on work force education. Part 1, an executive summary, reports how the project was successfully established and…

  18. Evaluation of Title I ESEA Projects, 1975-1976: Technical Reports. Report No. 77124.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    Technical reports of individual Title I project evaluations conducted during the 1975-76 school year are presented. The volume contains extensive information about each project's rationale, expected outcomes, mode of operation, previous evaluative findings, current implementation, and attainment of its objectives. The Title I evaluations contained…

  19. Strategic Project Management at the NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.

    2000-01-01

    This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.

  20. 34 CFR 380.6 - What activities may the Secretary fund under technical assistance supported employment projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What activities may the Secretary fund under technical... WITH THE MOST SEVERE DISABILITIES AND TECHNICAL ASSISTANCE PROJECTS General § 380.6 What activities may the Secretary fund under technical assistance supported employment projects? The following...

  1. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  2. Understanding the Manager of the Project Front-End

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Imprescia, Cliff (Technical Monitor)

    2000-01-01

    Historical data and new findings from interviews with managers of major National Aeronautics and Space Administration (NASA) projects confirm literature reports about the criticality of the front-end phase of project development, where systems engineering plays such a key role. Recent research into the management of ten contemporary NASA projects, combined with personal experience of the author in NASA, provide some insight into the relevance and importance of the project manager in this initial part of the project life cycle. The research findings provide evidence of similar approaches taken by the NASA project manager.

  3. Project DEEP STEAM: Fourth meeting of the technical advisory panel

    NASA Astrophysics Data System (ADS)

    Fox, R. L.; Donaldson, A. B.; Eisenhawer, S. W.; Hart, C. M.; Johnson, D. R.; Mulac, A. J.; Wayland, J. R.; Weirick, L. J.

    1981-07-01

    The status of project DEEP STEAM was reviewed. Proceedings, are divided into five main sections: (1) the injection string modification program; (2) the downhole steam generator program; (3) supporting activities; (4) field testing; and (5) recommendations and discussion.

  4. SOUTH FLORIDA ECOSYSTEM ASSESSMENT PROJECT: FINAL TECHNICAL REPORT - PHASE I

    EPA Science Inventory

    The South Florida Ecosystem Assessment Project is an innovative, large-scale monitoring and assessment program designed to measure current and changing conditions of ecological resources in South Florida using an integrated holistic approach. Using the United States Environmenta...

  5. JICA project-type technical cooperation agreed for Vietnam.

    PubMed

    1997-05-01

    The Japan International Cooperation Agency and JOICFP are working with the Viet Nam government to implement a new reproductive health project in Nghe An province. The goal of the project is to use a primary health care approach to improve women's reproductive health. Various components of the project include 1) training or retraining midwives and assistant physicians with a focus on such reproductive health topics as safe motherhood and IUD insertion and removal; 2) providing of medical equipment (delivery beds, midwifery kits, and IUD insertion kits) to the commune health centers; 3) renovating health facilities; 4) grassroots education; and 5) capacity-building in the Family Planning and Maternal and Child Health Center that will be the administrative center of the project. Project planners hope to increase availability of IUD insertion and removal services (women currently have to rely on a monthly visit by mobile teams). Grassroots educational activities will involve the efforts of the women's union, which will contribute to the project from its planning stage. PMID:12347955

  6. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    ERIC Educational Resources Information Center

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  7. 77 FR 30512 - Native American Career and Technical Education Program; Final Waivers and Extension of Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ...For 60-month projects funded in fiscal year (FY) 2007 under the Native American Career and Technical Education Program (NACTEP), the Secretary waives 34 CFR 75.250 and 75.261(c)(2) in order to extend the project period of these current NACTEP grants for an additional 12 months. This will enable the 30 current NACTEP grantees to seek FY 2012 continuation awards for their current projects......

  8. Eckerd College Energy Systems Project. Final technical report

    SciTech Connect

    DeGroot, D.E.

    1984-02-06

    The Eckerd College Energy Systems Project (ESP) consisted of four interrelated components: Organic gardening; Aquaculture (Tilapia); Methane gas conversion and utilization as energy source to drive an electric generator; Solar water heating component. These components were designed to demonstrate the feasibility of using alternative technologies to reduce petro-chemical energy dependency, to provide faculty and staff with hands-on A.T. experience, and to involve the general community in A.T. energy experiences. The Organic, Aquaculture and Solar components were successful. The Methane project was not. The educational goals of the project were met or exceeded. It is strongly recommended that DOE/AT support ESP like programs at all educational levels as part of our national commitment to developing an increasing capability for energy self sufficiency in the general population.

  9. Ground Water Quality and Riparian Enhancement Projects in Sherman County, Oregon; Coordination and Technical Assistance, 2002-2003 Annual Report.

    SciTech Connect

    Faucera, Jason

    2003-06-23

    This project was designed to provide project coordination and technical assistance to producers in Sherman County for on the ground water quality enhancement and riparian enhancement projects. This is accomplished utilizing the USDA Conservation Enhancement Reserve Program (CREP) and other grant monies to translate the personnel funds in this project to on the ground projects. Two technicians and one watershed council coordinator are funded, either wholly or in part, by funds from this grant. The project area encompasses the whole of Sherman County which is bordered almost entirely by streams providing habitat or migration corridors for endangered fish species including steelhead and Chinook salmon. Three of those four streams and one other major Sherman County stream are listed on the DEQ 303(d) list of water quality limited streams for exceeding summer temperature limits. Temperature in streams are directly affected by the amount of solar radiation allowed to reach the surface of the water. Practices designed to improve bank-side vegetation, such as the CREP program, will counteract the solar heating of those water quality listed streams, benefiting endangered stocks. CREP and water quality projects are promoted and coordinated with local landowners through locally-led watershed councils. Funding from BPA provides a portion of the salary for a watershed council coordinator who acts to disseminate water quality and USDA program information directly to landowners through watershed council activities. The watershed coordinator acts to educate landowners in water quality and riparian management issues and to secure funds for the implementation of on the ground water quality projects. Actual project implementation is carried out by the two technicians funded by this project. Technicians in Sherman County, in cooperation with the USDA Natural Resources Conservation Service, assist landowners in developing Resource Management Systems (RMS) that address resource concerns

  10. Ground Water Quality and Riparian Enhancement Projects in Sherman County, Oregon; Coordination and Technical Assistance, 2003-2004 Annual Report.

    SciTech Connect

    Faucera, Jason

    2004-05-01

    This project was designed to provide technical assistance and project coordination to producers in Sherman County for on the ground water quality and riparian enhancement projects. This is accomplished utilizing the USDA Conservation Reserve Enhancement Program (CREP) in addition to other grant monies to translate the personnel funds in this project to on the ground projects. Two technicians and one watershed council coordinator are funded, either wholly or in part, by funds from this grant. The project area encompasses the whole of Sherman County which is bordered almost entirely by streams providing habitat or migration corridors for endangered fish species including steelhead and Chinook salmon. Of those four streams that comprise Sherman County's boundaries, three are listed on the DEQ 303(d) list of water quality limited streams for exceeding summer temperature limits. Only one stream in the interior of Sherman County is 303(d) listed for temperatures, but is the largest watershed in the County. Temperatures in streams are directly affected by the amount of solar radiation allowed to reach the surface of the water. Practices designed to improve bank-side vegetation, such as the CREP program, will counteract the solar heating of those water quality listed streams, benefiting endangered stocks. CREP and water quality projects are promoted and coordinated with local landowners through locally-led watershed councils. Funding from BPA provides a portion of the salary for a watershed council coordinator who acts to disseminate water quality and USDA program information directly to landowners through watershed council activities. The watershed coordinator acts to educate landowners in water quality and riparian management issues and to secure funds for the implementation of on the ground water quality projects. Actual project implementation is carried out by the two technicians funded by this project. Technicians in Sherman County, in cooperation with the USDA

  11. Ground Water Quality and Riparian Enhancement Projects in Sherman County, Oregon : Coordination and Technical Assistance, 2004-2005 Annual Report.

    SciTech Connect

    Faucera, Jason

    2005-06-01

    This project was designed to provide technical assistance and project coordination to producers in Sherman County for on the ground water quality and riparian enhancement projects. This is accomplished utilizing the USDA Conservation Reserve Enhancement Program (CREP) in addition to other grant monies to translate the personnel funds in this project to on the ground projects. Two technicians and one watershed council coordinator are funded, either wholly or in part, by funds from this grant. The project area encompasses the whole of Sherman County which is bordered almost entirely by streams providing habitat or migration corridors for endangered fish species including steelhead and Chinook salmon. Of those four streams that comprise Sherman County's boundaries, three are listed on the DEQ 303(d) list of water quality limited streams for exceeding summer temperature limits. Only one stream in the interior of Sherman County is 303(d) listed for temperatures, but is the largest watershed in the County. Temperatures in streams are directly affected by the amount of solar radiation allowed to reach the surface of the water. Practices designed to improve bank-side vegetation, such as the CREP program, will counteract the solar heating of those water quality listed streams, benefiting endangered stocks. CREP and water quality projects are promoted and coordinated with local landowners through locally-led watershed councils. Funding from BPA provides a portion of the salary for a watershed council coordinator who acts to disseminate water quality and USDA program information directly to landowners through watershed council activities. The watershed coordinator acts to educate landowners in water quality and riparian management issues and to secure funds for the implementation of on the ground water quality projects. Actual project implementation is carried out by the two technicians funded by this project. Technicians in Sherman County, in cooperation with the USDA

  12. Education Project Management in the Information Age: The Case of the Kimberley Thusanang Project

    ERIC Educational Resources Information Center

    Harvey, Stephen

    2004-01-01

    This article reports on the experiences of the Kimberley Thusanang Project (KTP). It proposes that the project's use of a database system as a management tool represents a significant development in the design of effective education projects in South Africa. The article describes how this system assists project management in overcoming two key…

  13. Topometry of technical and biological objects by fringe projection

    NASA Astrophysics Data System (ADS)

    Windecker, R.; Tiziani, H. J.

    1995-07-01

    Fringe projection is a fast and accurate technique for obtaining the topometry of a wide range of surfaces. Here some features of the principle are described, together with the possibilities of adapting this technique for the measurement of vaulted surfaces. We discuss various methods of phase evaluation and compare them with simulated computer data to obtain the resolution limits. Under certain restrictions a semispatial algorithm, called the modified Fourier analysis algorithm, gives the best results. One special subject of interest is the application of fringe projection for the measurement of the three-dimensional surface of the cornea. First results of in vivo measurements are presented.

  14. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    NASA Technical Reports Server (NTRS)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  15. Project management in the development of scientific software

    NASA Astrophysics Data System (ADS)

    Platz, Jochen

    1986-08-01

    This contribution is a rough outline of a comprehensive project management model for the development of software for scientific applications. The model was tested in the unique environment of the Siemens AG Corporate Research and Technology Division. Its focal points are the structuring of project content - the so-called phase organization, the project organization and the planning model used, and its particular applicability to innovative projects. The outline focuses largely on actual project management aspects rather than associated software engineering measures.

  16. BPA-Solicited Technical Review of "Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline", Technical Report 2004.

    SciTech Connect

    Morgan, David

    2004-02-01

    The purpose of this report was to provide, at BPA's request, a technical review of interim products received for Project 2001-015-00 under contract 6925. BPA sometimes solicits technical reviews for Fish and Wildlife products or issues where outside expertise is required. External review of complex project deliverables assures BPA as a funding agency that the contractor is continuing with scientifically-credible experimental techniques envisioned in the original proposal. If the project's methodology proves feasible, there could be potential applications beyond the project area to similar situations in the Columbia Basin. The Experiment involves artificial flooding during high flow periods and a determination of the portion of the return flows that end up in the Umatilla River during low flow months and within acceptable water quality parameters (e.g., low temperature, few contaminants). Flooding could be a critical water source for aquatic organisms at times of the year when flows in the lower reaches of the Umatilla River are low and water is warmer than would be desired. The experiment was proposed to test whether 'this process, recharges the shallow aquifers of the old flood plain, for natural filtration through the alluvial soils as it returns to the Umatilla River, cleaner and cooler (about 50 degree Fahrenheit) five to six month later (about July and August) substantially cooling the river and [making it] more beneficial to anadromous [fish]'. A substantial amount of preliminary data had been collected and preliminary results were submitted in an interim report 'Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline (December 2002)'. A substantial amount of addition funding was provided for the last cycle of flooding (Phases II) and final analyses of the full compliment of data collected over the life of the contract (Phase III). Third party scientific review may assist the contractor in producing a higher quality Final Report with

  17. Advanced Hybrid Particulate Collector Project Management Plan

    SciTech Connect

    Miller, S.J.

    1995-11-01

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

  18. Pittsburgh Technical Health Training Institute Demonstration Project; Quarterly Report.

    ERIC Educational Resources Information Center

    Kishkunas, Louis J.

    This fifth quarterly report covers the period June 15, 1967 to December 15, 1967 of a project aimed at demonstrating a faster method of training higly qualified workers for the health field. During this period, nurse aides were trained in a pilot program based upon the educational objectives derived from entry level behavioral specifications…

  19. Three-dimensional digital projection in neurosurgical education: technical note.

    PubMed

    Martins, Carolina; Ribas, Eduardo Carvalhal; Rhoton, Albert L; Ribas, Guilherme Carvalhal

    2015-10-01

    Three-dimensional images have become an important tool in teaching surgical anatomy, and its didactic power is enhanced when combined with 3D surgical images and videos. This paper describes the method used by the last author (G.C.R.) since 2002 to project 3D anatomical and surgical images using a computer source. Projecting 3D images requires the superposition of 2 similar but slightly different images of the same object. The set of images, one mimicking the view of the left eye and the other mimicking the view of the right eye, constitute the stereoscopic pair and can be processed using anaglyphic or horizontal-vertical polarization of light for individual use or presentation to larger audiences. Classically, 3D projection could be obtained by using a double set of slides, projected through 2 slide projectors, each of them equipped with complementary filters, shooting over a medium that keeps light polarized (a silver screen) and having the audience wear appropriate glasses. More recently, a digital method of 3D projection has been perfected. In this method, a personal computer is used as the source of the images, which are arranged in a Microsoft PowerPoint presentation. A beam splitter device is used to connect the computer source to 2 digital, portable projectors. Filters, a silver screen, and glasses are used, similar to the classic method. Among other advantages, this method brings flexibility to 3D presentations by allowing the combination of 3D anatomical and surgical still images and videos. It eliminates the need for using film and film developing, lowering the costs of the process. In using small, powerful digital projectors, this method substitutes for the previous technology, without incurring a loss of quality, and enhances portability. PMID:25884261

  20. Ground Water Quality and Riparian Enhancement Projects in Sherman County, Oregon; Coordination and Technical Assistance, 2005-2006 Annual Report.

    SciTech Connect

    Faucera, Jason

    2006-06-01

    This project was designed to provide technical assistance and project coordination to producers in Sherman County for on the ground water quality and riparian enhancement projects. This is accomplished utilizing the USDA Conservation Reserve Enhancement Program (CREP) in addition to other grant monies to translate the personnel funds in this project to on the ground projects. Two technicians and one watershed council coordinator are funded, either wholly or in part, by funds from this grant. The project area encompasses the whole of Sherman County which is bordered almost entirely by streams providing habitat or migration corridors for endangered fish species including steelhead and Chinook salmon. Of those four streams that comprise Sherman County's boundaries, three are listed on the DEQ 303(d) list of water quality limited streams for exceeding summer temperature limits. Only one stream in the interior of Sherman County is 303(d) listed for temperatures, but is the largest watershed in the County. Temperatures in streams are directly affected by the amount of solar radiation allowed to reach the surface of the water. Practices designed to improve bank-side vegetation, such as the CREP program, will counteract the solar heating of those water quality listed streams, benefiting endangered stocks. CREP and water quality projects are promoted and coordinated with local landowners through locally-led watershed councils. Funding from BPA provides a portion of the salary for a watershed council coordinator who acts to disseminate water quality and USDA program information directly to landowners through watershed council activities. The watershed coordinator acts to educate landowners in water quality and riparian management issues and to secure funds for the implementation of on the ground water quality projects. Actual project implementation is carried out by the two technicians funded by this project. Technicians in Sherman County, in cooperation with the USDA

  1. Technical clarity in inter-agency negotiations: Lessons from four hydropower projects

    USGS Publications Warehouse

    Burkardt, Nina; Lamb, Berton Lee; Taylor, Jonathan G.; Waddle, Terry J.

    1995-01-01

    We investigated the effect of technical clarity on success in multi-party negotiations in the Federal Energy Regulatory Commission (FERC) licensing process. Technical clarity is the shared understanding of dimensions such as the geographic extent of the project, range of flows to be considered, important species and life stages, and variety of water uses considered. The results of four hydropower licensing consultations are reported. Key participants were interviewed to ascertain the level of technical clarity present during the consultations and the degree to which the consultations were successful. Technical clarity appears to be a prerequisite for successful outcomes. Factors that enhance technical clarity include simple project design, new rather than existing projects, precise definition of issues, a sense of urgency to reach agreement, a sense of fairness among participants, and consistency in participation. Negotiators should not neglect the critical pre-negotiation steps of defining technical issues and determining appropriate studies, deciding how to interpret studies, and agreeing on responses to study results.

  2. DBMS as a Tool for Project Management

    NASA Technical Reports Server (NTRS)

    Linder, H.

    1984-01-01

    Scientific objectives of crustal dynamics are listed as well as the contents of the centralized data information system for the crustal dynamics project. The system provides for project observation schedules, gives project configuration control information and project site information.

  3. Building an Experiential Learning Model for a Project Management Course

    ERIC Educational Resources Information Center

    Chen, Kuan C.; Chuang, Keh-Wen

    2009-01-01

    Teaching students to become project management professionals requires a real world experience. Incorporating live clients into student projects, instead of using case studies or mock companies, adds a dimension that exposes students to the realities of project management. This paper will describe a structured methodology used in a project…

  4. Project Management in Instructional Design: ADDIE Is Not Enough

    ERIC Educational Resources Information Center

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  5. An Examination of Assistant Professors' Project Management Practices

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson; Hartshorne, Richard

    2013-01-01

    Purpose: The purpose of this research was to identify factors that influence the use of project management in higher education research projects by investigating the project management practices of assistant professors. Design/methodology/approach: Using a grounded theory approach that included in-depth, semi-structured interviews with 22…

  6. How Configuration Management Helps Projects Innovate and Communicate

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis A.; Guidry, Carla F.

    2009-01-01

    This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.

  7. Leveraging Text Content for Management of Construction Project Documents

    ERIC Educational Resources Information Center

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  8. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    SciTech Connect

    Joe Taddeucci, P E

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  9. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    SciTech Connect

    Not Available

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  10. The Expert Project Management System (EPMS)

    NASA Technical Reports Server (NTRS)

    Silverman, Barry G.; Diakite, Coty

    1986-01-01

    Successful project managers (PMs) have been shown to rely on 'intuition,' experience, and analogical reasoning heuristics. For new PMs to be trained and experienced PMs to avoid repeating others' mistakes, it is necessary to make the knowledge and heuristics of successful PMs more widely available. The preparers have evolved a model of PM thought processes over the last decade that is now ready to be implemented as a generic PM aid. This aid consists of a series of 'specialist' expert systems (CRITIC, LIBRARIAN, IDEA MAN, CRAFTSMAN, and WRITER) that communicate with each other via a 'blackboard' architecture. The various specialist expert systems are driven to support PM training and problem solving since any 'answers' they pass to the blackboard are subjected to conflict identification (AGENDA FORMULATOR) and GOAL SETTER inference engines.

  11. Project Management Framework to Organizational Transitions

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Barton, Saul

    1996-01-01

    This paper describes a project management framework and associated models for organizational transitions. The framework contains an integrated set of steps an organization can take to lead an organizational transition such as downsizing and change in mission or role. The framework is designed to help an organization do the right work the right way with the right people at the right time. The underlying rationale for the steps in the framework is based on a set of findings which include: defining a transition as containing both near-term and long-term actions, designing actions which respond to drivers and achieve desired results, aligning the organization with the external environment, and aligning the internal components of the organization. The framework was developed based on best practices found in the literature, lessons learned from heads of organizations who have completed large-scale organizational changes, and concerns from employees at the Kennedy Space Center (KSC). The framework is described using KSC.

  12. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    SciTech Connect

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  13. A formal risk management process for instrumentation projects at the Anglo-Australian Observatory

    NASA Astrophysics Data System (ADS)

    Orr, David R.; Heng, Anthony

    2010-07-01

    Risk management is a dynamic activity that takes place throughout the development process from the concept phase to the retirement phase of the project. The successful management of risk is a critical part of the instrumentation development process at the AAO. The AAO has a risk management process based on the AS/ISO standard for risk management. Brainstorming sessions are conducted with the project team. Potential project risks are identified by the team and grouped into the categories of technical, political, operational, logistical, environmental, and safety. A risk matrix is populated with details of each risk. The risk is then ranked based on the consequence and likelihood according to the scale of Low, Moderate, Significant, and High. The level of risk is evaluated; mitigation control mechanisms are identified, and assigned to a specific team member for resolution. Risk management is used as a management tool for the HERMES project. The top 5 risks are identified, and management efforts are then concentrating on reducing these risks. Risk management is also used during the development process as a trade study tool to evaluate different design options and assist senior management to make informed decisions.

  14. Messiah College Biodiesel Fuel Generation Project Final Technical Report

    SciTech Connect

    Zummo, Michael M; Munson, J; Derr, A; Zemple, T; Bray, S; Studer, B; Miller, J; Beckler, J; Hahn, A; Martinez, P; Herndon, B; Lee, T; Newswanger, T; Wassall, M

    2012-03-30

    Many obvious and significant concerns arise when considering the concept of small-scale biodiesel production. Does the fuel produced meet the stringent requirements set by the commercial biodiesel industry? Is the process safe? How are small-scale producers collecting and transporting waste vegetable oil? How is waste from the biodiesel production process handled by small-scale producers? These concerns and many others were the focus of the research preformed in the Messiah College Biodiesel Fuel Generation project over the last three years. This project was a unique research program in which undergraduate engineering students at Messiah College set out to research the feasibility of small-biodiesel production for application on a campus of approximately 3000 students. This Department of Energy (DOE) funded research program developed out of almost a decade of small-scale biodiesel research and development work performed by students at Messiah College. Over the course of the last three years the research team focused on four key areas related to small-scale biodiesel production: Quality Testing and Assurance, Process and Processor Research, Process and Processor Development, and Community Education. The objectives for the Messiah College Biodiesel Fuel Generation Project included the following: 1. Preparing a laboratory facility for the development and optimization of processors and processes, ASTM quality assurance, and performance testing of biodiesel fuels. 2. Developing scalable processor and process designs suitable for ASTM certifiable small-scale biodiesel production, with the goals of cost reduction and increased quality. 3. Conduct research into biodiesel process improvement and cost optimization using various biodiesel feedstocks and production ingredients.

  15. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  16. Research on R&D Project Risk Management Model

    NASA Astrophysics Data System (ADS)

    Gu, Xiaoyan; Cai, Chen; Song, Hao; Song, Juan

    R&D project is an exploratory high-risk investment activity and has potential management flexibility. In R&D project risk management process, it is hard to quantify risk with very little past information available. This paper introduces quality function deployment and real option in traditional project risk management process. Through waterfall decomposition mode, R&D project risk management process is constructed step by step; through real option, the managerial flexibility inherent in R&D project can be modeled. In the paper, first of all, according to the relation matrix between R&D project success factors and risk indexes, risk priority list can be obtained. Then, risk features of various stages are analyzed. Finally, real options are embedded into various stages of R&D project by the risk features. In order to effectively manage R&D risk in a dynamic cycle, the steps above should be carried out repeatedly.

  17. A Socio-Technical Analysis of Web Content Management: "Content is King."

    ERIC Educational Resources Information Center

    Eschenfelder, Kristin

    2001-01-01

    Examines how ongoing content management needs and tasks affect organizations that maintain Web-based information systems (Web IS). Investigates how organizational context shapes content management practice and configuration of the underlying Web IS technology. Presents a model of the socio-technical context of Web IS content management. (AEF)

  18. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    SciTech Connect

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  19. Projects at the Component Development and Integration Facility. Quarterly technical progress report, July 1--September 30, 1993

    SciTech Connect

    Not Available

    1993-12-31

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the first quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept project; mine waste technology pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

  20. Projects at the Component Development and Integration Facility. Quarterly technical progress report, October 1--December 31, 1992

    SciTech Connect

    Not Available

    1992-12-31

    This quarterly technical progress report presents progress on the projects at the component Development and Integration Facility (CDIF) during the first quarter of FY93. The CDIF is a major US Department of Energy (DOE) test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD proof-of-concept project; mine waste pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

  1. Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    SciTech Connect

    Not Available

    1994-08-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; and Spray Casting Project.

  2. Projects at the Component Development and Integration Facility. Quarterly technical progress report, April 1--June 30, 1993

    SciTech Connect

    Not Available

    1993-12-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY93. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept Project; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; Soil Washing Project; and Spray Casting Project.

  3. Homogenisation in project management for large German research projects in the Earth system sciences: overcoming the institutional coordination bias

    NASA Astrophysics Data System (ADS)

    Rauser, Florian; Vamborg, Freja

    2016-04-01

    complement the current system, by creating permanent, sustained options for interactions between large research projects in similar fields. In the long run such a centre might improve on the host-based system because the centre-based solution allows multiple projects to be coordinated in conjunction by experienced science managers, using overlap in meeting organization, reporting, infrastructure, travel and so on. To still maintain close cooperation between project managers and lead PIs, we envision a virtual centre that creates extensive collaborative opportunities by organizing yearly retreats, a shared technical data base, et cetera. As "CESSMA" is work in progress (we have applied for funding for 2016-18), we would like to use this opportunity to discuss chances, potential problems, experiences and options for this attempt to institutionalise the very reason for this session: improved, coordinated, effective science coordination; and to create a central focal point for public / academia interactions.

  4. Industrial Program of Waste Management - Cigeo Project - 13033

    SciTech Connect

    Butez, Marc; Bartagnon, Olivier; Gagner, Laurent; Advocat, Thierry; Sacristan, Pablo; Beguin, Stephane

    2013-07-01

    The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

  5. Public participation in UMTRA Project program management

    SciTech Connect

    Majors, M.J.; Ulland, L.M.

    1993-12-31

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it`s been shown that an effective public participation program is an essential element to successful project implementation.

  6. Planning a text-management system for technical publications at Oak Ridge National Laboratory

    SciTech Connect

    Williams, E.N.; McCulloch, R.D.

    1980-01-01

    The planning and evolution of the centralized text-management system (CTMS) being implemented by the Technical Publications Department of the Oak Ridge National Laboratory's Information Division is described. The CTMS is a shared-logic system that provides for easy composition of technical documentation, including multilevel mathematics and complex tables. 3 figures.

  7. ISS Update: SPHERES with Telerobotics Project Manager Terry Fong

    NASA Video Gallery

    NASA Public Affairs Officer Brandi Dean talks with Terry Fong, Telerobotics Project Manager, about how the Synchronized Position, Hold, Engage and Reorient Experimental Satellites, or SPHERES, are ...

  8. [The Southern Sierra Nevada continental dynamics project]. Final technical report

    SciTech Connect

    Clayton, R.W.; Saleeby, J.B.

    1997-12-16

    The main objective of this study was to determine whether or not the Southern Sierra Nevada Mountain Range is supported by a crustal root. A secondary goal was to evaluate the relationship between the Sierra Nevada Range and the adjoining Death Valley extensional province. As part of the project, two seismic profiles were executed. The first was a north-south profile running from Ridgecrest to Chafant Valley. The second was an east-west profile from Death Valley to Coalinga. An NPE shot was recorded on the east-west receiver line, and the data were analyzed by forward modeling with a staggered-grid finite-difference code. Concurrently, the authors initiated an in-depth study of lower crustal and upper mantle xenoliths hosted by Neogene volcanic rocks of the central and southern Sierra Nevada region. This initial work focused on thermobarometric estimates of representative xenolith samples aimed at understanding the vertical composition of the Sierra Nevada lithosphere.

  9. TECHNICAL NOTE: Micro projection lithography using microlens on a mask

    NASA Astrophysics Data System (ADS)

    Ji, Chang-Hyeon; Herrault, Florian; Allen, Mark G.

    2009-12-01

    A micro projection lithography process has been implemented using a photomask having arrays of cylindrical or spherical plano-convex microlenses formed by thermal reflow in proximity exposure mode. This approach provides a practical means to generate patterns inside deep cavities without proximity-based pattern size increases. The generated pattern size can be controlled by controlling the focal depth of the microlens. A maximum pattern size reduction of 62% has been achieved at the bottom of a 216 µm deep trench with a cylindrical microlens having a focal length of 254 µm for a 60 µm square pattern. The effect of the microlens on the lithography process, including the relationship between the focal depth, exposure dose and pattern size, has been analyzed.

  10. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  11. An approach to knowledge structuring for advanced phases of the Technical and Management Information System (TMIS)

    NASA Technical Reports Server (NTRS)

    Goranson, H. T.

    1986-01-01

    The Technical and Management Information System (TMIS) must employ on enlightened approach to its object structure, but basic issues in conceptual structuring remain to be resolved. Sirius outlines the necessary agenda and reports on progress toward solutions.

  12. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... bundle of services include: (i) Supervision by the management agent and its staff (time, knowledge, and... demand. (2) A certification will be executed each time a management agent is proposed and a management... 7 Agriculture 15 2011-01-01 2011-01-01 false Housing project management. 3560.102 Section...

  13. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... bundle of services include: (i) Supervision by the management agent and its staff (time, knowledge, and... demand. (2) A certification will be executed each time a management agent is proposed and a management... 7 Agriculture 15 2014-01-01 2014-01-01 false Housing project management. 3560.102 Section...

  14. TANK FARM REMEDIATION TECHNOLOGY DEVELOPMENT PROJECT AN EXERCISE IN TECHNICAL & REGULATORY COLLABORATION

    SciTech Connect

    JARAYSI, M.N.

    2007-01-08

    The Tank Farm Remediation Technology Development Project at the Hanford Site focuses on waste storage tanks, pipelines and associated ancillary equipment that are part of the C-200 single-shell tank (SST) farm system located in the C Tank Farm. The purpose of the project is to obtain information on the implementation of a variety of closure activities and to answer questions on technical, operational and regulatory issues associated with closure.

  15. Relationship between time management in construction industry and project management performance

    NASA Astrophysics Data System (ADS)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  16. Forty project management strategies for the medical practice staff.

    PubMed

    Hills, Laura Sachs

    2010-01-01

    Most every medical practice will embark at one time or another on a large and complex new project. The practice may, for instance, undertake a project in office construction or renovation, practice expansion, new technology, or a new large-scale event. The medical practice staff may find itself creating the project plan, overseeing its execution, and working through the plan day to day until its completion. In short, the staff may find itself responsible for project management. This article contains 40 specific, easy-to-implement project management strategies medical practice employees can use to manage both the large and small projects they undertake on behalf of the practice. It suggests effective project management strategies the staff can use before the onset of a new project as well as strategies to help define the project, to deliver the project, and to close and review the project. This article also describes five reasons medical practices often fail at project management and suggests more effective approaches that will ensure that the projects the medical practice undertakes are completed well, on time, and within budget. PMID:20480774

  17. Challenge Study: A Project-Based Learning on a Wireless Communication System at Technical High School

    ERIC Educational Resources Information Center

    Terasawa, Ikuo

    2016-01-01

    The challenge study is a project based learning curriculum at Technical High School aimed at the construction of a wireless communication system. The first period was engineering issues in the construction of an artificial satellite and the second period was a positional locating system based on the general purpose wire-less device--ZigBee device.…

  18. Fox Valley Technical College New Occupational Markets: Market Research Project Results.

    ERIC Educational Resources Information Center

    Mishler, Carol

    This is a report on the results of a market research project conducted by Fox Valley Technical College (FVTC) (Wisconsin) to identify new occupational markets in the college's service area. The college scanned national job lists, employment databases, and northeastern Wisconsin employer advertisements. The college also surveyed employers in the…

  19. Promoting Gender Parity in Basic Education: Lessons from a Technical Cooperation Project in Yemen

    ERIC Educational Resources Information Center

    Yuki, Takako; Mizuno, Keiko; Ogawa, Keiichi; Mihoko, Sakai

    2013-01-01

    Many girls are not sent to school in Yemen, despite basic education being free as well as compulsory for all children aged 6-15. Aiming to improve girls' enrollment by increasing parental and community involvement, the Japan International Cooperation Agency (JICA) offered a technical cooperation project in June 2005 called Broadening Regional…

  20. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Computers.

    ERIC Educational Resources Information Center

    Ellis, Brenda

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 3-hour introduction to computers. The purpose is to develop the following competencies: (1) orientation to data processing; (2) use of data entry devices; (3) use of computer menus; and (4) entry of data with accuracy and…

  1. Minnesota Deafblind Technical Assistance Project. Final Report: October 1, 1995 to September 30, 2000.

    ERIC Educational Resources Information Center

    Holt, George

    This final report describes activities of the 4-year federally-funded Minnesota DeafBlind Assistance Project in meeting the following objectives: (1) provide technical assistance throughout the state; (2) deliver training to improve transitions from school to adult life for youth with deaf-blindness; (3) develop and implement procedures to locate…

  2. Appendix 1.1 Tables. Continuation Education System Development Project. Technical Report.

    ERIC Educational Resources Information Center

    East, Leon; Jensen, J. Alan

    The Continuation Education System Development Project technical report of appendix tables includes: (1) a bibliography; (2) letters to schools; (3) the initial in-service training program of Valley staff; (4) data of a teacher evaluation survey; (5) instructional preference scale data; (6) meaning of words inventory data; (7) a physical profile;…

  3. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    ERIC Educational Resources Information Center

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  4. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    ERIC Educational Resources Information Center

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  5. Solid Waste Projection Model: Database (Version 1.4). Technical reference manual

    SciTech Connect

    Blackburn, C.; Cillan, T.

    1993-09-01

    The Solid Waste Projection Model (SWPM) system is an analytical tool developed by Pacific Northwest Laboratory (PNL) for Westinghouse Hanford Company (WHC). The SWPM system provides a modeling and analysis environment that supports decisions in the process of evaluating various solid waste management alternatives. This document, one of a series describing the SWPM system, contains detailed information regarding the software and data structures utilized in developing the SWPM Version 1.4 Database. This document is intended for use by experienced database specialists and supports database maintenance, utility development, and database enhancement. Those interested in using the SWPM database should refer to the SWPM Database User`s Guide. This document is available from the PNL Task M Project Manager (D. L. Stiles, 509-372-4358), the PNL Task L Project Manager (L. L. Armacost, 509-372-4304), the WHC Restoration Projects Section Manager (509-372-1443), or the WHC Waste Characterization Manager (509-372-1193).

  6. Develop data management system for assistance in conducting area of reviews in Texas: Quarterly technical report- 10th quarter, January 1-March 31, 1997

    SciTech Connect

    Wrotenbery, L.; Burgess, D. F.; Weitzel, L.; Williams, D.; Morgan, H.; Matthews, J.

    1997-04-15

    The following technical report provides a detailed status report of the DOE grant project entitled `Develop Data Management System for Assistance in Conducting Area of Reviews (AORS) in Texas.` The grant funding allocated is for the purpose of providing the Railroad Commission of Texas (Commission or RRC) with resources and capabilities to conduct AOR and AOR variance analysis statewide.

  7. Integrated Risk Management Within NASA Programs/Projects

    NASA Technical Reports Server (NTRS)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  8. An analysis of the technical status of high level radioactive waste and spent fuel management systems

    NASA Technical Reports Server (NTRS)

    English, T.; Miller, C.; Bullard, E.; Campbell, R.; Chockie, A.; Divita, E.; Douthitt, C.; Edelson, E.; Lees, L.

    1977-01-01

    The technical status of the old U.S. mailine program for high level radioactive nuclear waste management, and the newly-developing program for disposal of unreprocessed spent fuel was assessed. The method of long term containment for both of these waste forms is considered to be deep geologic isolation in bedded salt. Each major component of both waste management systems is analyzed in terms of its scientific feasibility, technical achievability and engineering achievability. The resulting matrix leads to a systematic identification of major unresolved technical or scientific questions and/or gaps in these programs.

  9. Management and overview Quality Assurance Program Plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1986-08-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office (DOE/ UMTRA-PO) is the US Department of Energy (DOE) Albuquerque Operations Office (AL) organization charged with the responsibility of managing and coordinating the activities of the various participating organizations and support contractors working on the UMTRA Project. This Quality Assurance Program Plan (QAPP) describes how the DOE/UMTRA-PO, as assisted by the Technical Assistance Contractor (TAC), performs the quality assurance (QA) aspects of managing and coordinating UMTRA Project activities. This QAPP was developed to comply with DOE Order 5700.6A, August, 1981, and AL Order 5700.6B, April, 1984, which contain the criteria applicable to Project QA activities.

  10. Program/Project Management Resources: A collection of 50 bibliographies focusing on continual improvement, reinventing government, and successful project management

    NASA Technical Reports Server (NTRS)

    Michaels, Jeffrey

    1994-01-01

    These Program/Project Management Resource Lists were originally written for the NASA project management community. Their purpose was to promote the use of the NASA Headquarters Library Program/Project Management Collection funded by NASA Headquarters Code FT, Training & Development Division, by offering introductions to the management topics studied by today's managers. Lists were also written at the request of NASA Headquarters Code T, Office of Continual improvements, and at the request of NASA members of the National Performance Review. This is the second edition of the compilation of these bibliographies; the first edition was printed in March 1994.

  11. Mississippi Ethanol Gasification Project, Final Scientific / Technical Report

    SciTech Connect

    Pearson, Larry, E.

    2007-04-30

    The Mississippi Ethanol (ME) Project is a comprehensive effort to develop the conversion of biomass to ethanol utilizing a proprietary gasification reactor technology developed by Mississippi Ethanol, LLC. Tasks were split between operation of a 1/10 scale unit at the Diagnostic Instrumentation and Analysis Laboratory (DIAL) of Mississippi State University (MSU) and the construction, development, and operation of a full scale pilot unit located at the ME facility in Winona, Mississippi. In addition to characterization of the ME reactor gasification system, other areas considered critical to the operational and economic viability of the overall ME concept were evaluated. These areas include syngas cleanup, biological conversion of syngas to alcohol, and effects of gasification scale factors. Characterization of run data from the Pre-Pilot and Pilot Units has allowed development of the factors necessary for scale-up from the small unit to the larger unit. This scale range is approximately a factor of 10. Particulate and tar sampling gave order of magnitude values for preliminary design calculations. In addition, sampling values collected downstream of the ash removal system show significant reductions in observed loadings. These loading values indicate that acceptable particulate and tar loading rates could be attained with standard equipment additions to the existing configurations. Overall operation both the Pre-Pilot and Pilot Units proceeded very well. The Pilot Unit was operated as a system, from wood receiving to gas flaring, several times and these runs were used to address possible production-scale concerns. Among these, a pressure feed system was developed to allow feed of material against gasifier system pressure with little or no purge requirements. Similarly, a water wash system, with continuous ash collection, was developed, installed, and tested. Development of a biological system for alcohol production was conducted at Mississippi State University with

  12. THE SLOAN DIGITAL SKY SURVEY REVERBERATION MAPPING PROJECT: TECHNICAL OVERVIEW

    SciTech Connect

    Shen, Yue; Brandt, W. N.; Dawson, Kyle S.; Hall, Patrick B.; McGreer, Ian D.; Fan, Xiaohui; Anderson, Scott F.; Chen, Yuguang; Denney, Kelly D.; Eftekharzadeh, Sarah; Gao, Yang; Green, Paul J.; Greene, Jenny E.; Ho, Luis C.; Horne, Keith; Kelly, Brandon C.; and others

    2015-01-01

    The Sloan Digital Sky Survey Reverberation Mapping (SDSS-RM) project is a dedicated multi-object RM experiment that has spectroscopically monitored a sample of 849 broad-line quasars in a single 7 deg{sup 2} field with the SDSS-III Baryon Oscillation Spectroscopic Survey spectrograph. The RM quasar sample is flux-limited to i {sub psf} = 21.7 mag, and covers a redshift range of 0.1 < z < 4.5 without any other cuts on quasar properties. Optical spectroscopy was performed during 2014 January-July dark/gray time, with an average cadence of ∼4 days, totaling more than 30 epochs. Supporting photometric monitoring in the g and i bands was conducted at multiple facilities including the Canada-France-Hawaii Telescope (CFHT) and the Steward Observatory Bok telescope in 2014, with a cadence of ∼2 days and covering all lunar phases. The RM field (R.A., decl. = 14:14:49.00, +53:05:00.0) lies within the CFHT-LS W3 field, and coincides with the Pan-STARRS 1 (PS1) Medium Deep Field MD07, with three prior years of multi-band PS1 light curves. The SDSS-RM six month baseline program aims to detect time lags between the quasar continuum and broad line region (BLR) variability on timescales of up to several months (in the observed frame) for ∼10% of the sample, and to anchor the time baseline for continued monitoring in the future to detect lags on longer timescales and at higher redshift. SDSS-RM is the first major program to systematically explore the potential of RM for broad-line quasars at z > 0.3, and will investigate the prospects of RM with all major broad lines covered in optical spectroscopy. SDSS-RM will provide guidance on future multi-object RM campaigns on larger scales, and is aiming to deliver more than tens of BLR lag detections for a homogeneous sample of quasars. We describe the motivation, design, and implementation of this program, and outline the science impact expected from the resulting data for RM and general quasar science.

  13. The Sloan Digital Sky Survey Reverberation Mapping Project: Technical Overview

    NASA Astrophysics Data System (ADS)

    Shen, Yue; Brandt, W. N.; Dawson, Kyle S.; Hall, Patrick B.; McGreer, Ian D.; Anderson, Scott F.; Chen, Yuguang; Denney, Kelly D.; Eftekharzadeh, Sarah; Fan, Xiaohui; Gao, Yang; Green, Paul J.; Greene, Jenny E.; Ho, Luis C.; Horne, Keith; Jiang, Linhua; Kelly, Brandon C.; Kinemuchi, Karen; Kochanek, Christopher S.; Pâris, Isabelle; Peters, Christina M.; Peterson, Bradley M.; Petitjean, Patrick; Ponder, Kara; Richards, Gordon T.; Schneider, Donald P.; Seth, Anil; Smith, Robyn N.; Strauss, Michael A.; Tao, Charling; Trump, Jonathan R.; Wood-Vasey, W. M.; Zu, Ying; Eisenstein, Daniel J.; Pan, Kaike; Bizyaev, Dmitry; Malanushenko, Viktor; Malanushenko, Elena; Oravetz, Daniel

    2015-01-01

    The Sloan Digital Sky Survey Reverberation Mapping (SDSS-RM) project is a dedicated multi-object RM experiment that has spectroscopically monitored a sample of 849 broad-line quasars in a single 7 deg2 field with the SDSS-III Baryon Oscillation Spectroscopic Survey spectrograph. The RM quasar sample is flux-limited to i psf = 21.7 mag, and covers a redshift range of 0.1 < z < 4.5 without any other cuts on quasar properties. Optical spectroscopy was performed during 2014 January-July dark/gray time, with an average cadence of ~4 days, totaling more than 30 epochs. Supporting photometric monitoring in the g and i bands was conducted at multiple facilities including the Canada-France-Hawaii Telescope (CFHT) and the Steward Observatory Bok telescope in 2014, with a cadence of ~2 days and covering all lunar phases. The RM field (R.A., decl. = 14:14:49.00, +53:05:00.0) lies within the CFHT-LS W3 field, and coincides with the Pan-STARRS 1 (PS1) Medium Deep Field MD07, with three prior years of multi-band PS1 light curves. The SDSS-RM six month baseline program aims to detect time lags between the quasar continuum and broad line region (BLR) variability on timescales of up to several months (in the observed frame) for ~10% of the sample, and to anchor the time baseline for continued monitoring in the future to detect lags on longer timescales and at higher redshift. SDSS-RM is the first major program to systematically explore the potential of RM for broad-line quasars at z > 0.3, and will investigate the prospects of RM with all major broad lines covered in optical spectroscopy. SDSS-RM will provide guidance on future multi-object RM campaigns on larger scales, and is aiming to deliver more than tens of BLR lag detections for a homogeneous sample of quasars. We describe the motivation, design, and implementation of this program, and outline the science impact expected from the resulting data for RM and general quasar science.

  14. Kansas Farm and Ranch Management Project.

    ERIC Educational Resources Information Center

    Albracht, James, Ed.

    Thirty-four units of instruction are included in this core curriculum in farm management for postsecondary farm and ranch management programs. Units of instruction are divided into twelve instructional areas: (1) Introduction to Financial Management, (2) Farm Business Arrangement, (3) Credit Management, (4) Budgeting, (5) Record Keeping, (6)…

  15. An Evaluation of the Science Education Component of the Cross River State Science and Technical Education Project

    ERIC Educational Resources Information Center

    Ekuri, Emmanuel Etta

    2012-01-01

    The Cross River State Science and Technical Education Project was introduced in 1992 by edict number 9 of 20 December 1991, "Cross River State Science and Technical Education Board Edit, 20 December, 1991", with the aim of improving the quality of science teaching and learning in the state. As the success of the project depends essentially on…

  16. Instructional Design and Project Management: Complementary or Divergent?

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  17. IPMA Standard Competence Scope in Project Management Education

    ERIC Educational Resources Information Center

    Bartoška, Jan; Flégl, Martin; Jarkovská, Martina

    2012-01-01

    The authors of the paper endeavoured to find out key competences in IPMA standard for educational approaches in project management. These key competences may be used as a basis for project management university courses. An incidence matrix was set up, containing relations between IPMA competences described in IPMA competence baseline. Further,…

  18. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... must develop and maintain a management plan for each housing project covered by their loan or grant... 7 Agriculture 15 2013-01-01 2013-01-01 false Housing project management. 3560.102 Section 3560.102 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, DEPARTMENT...

  19. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  20. Virtual Airspace Modeling and Simulation (VAMS) Project First Technical Interchange Meeting

    NASA Technical Reports Server (NTRS)

    Beard, Robert; Kille, Robert; Kirsten, Richard; Rigterink, Paul; Sielski, Henry; Gratteau, Melinda F. (Editor)

    2002-01-01

    A three-day NASA Virtual Airspace and Modeling Project (VAMS) Technical Interchange Meeting (TIM) was held at the NASA Ames Research Center in Mountain View, CA. on May 21 through May 23,2002. The purpose of this meeting was to share initial concept information sponsored by the VAMS Project. An overall goal of the VAMS Project is to develop validated, blended, robust and transition-able air transportation system concepts over the next five years that will achieve NASA's long-term Enterprise Aviation Capacity goals. This document describes the presentations at the TIM, their related questions and answers, and presents the TIM recommendations.

  1. Advanced Coal Conversion Process Demonstration Project. Technical progress report, January 1, 1995--March 31, 1995

    SciTech Connect

    1996-06-01

    This detailed report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project. This U.S. Department of Energy (DOE) Clean Coal Technology Project demonstrates an advanced thermal coal upgrading process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low-rank coals to high-quality, low-sulfur fuel. During this reporting period, the primary focus for the project was to expand market awareness and acceptability for the products and the technology. The use of covered hopper cars has been successful and marketing efforts have focused on this technique. Operational improvements are currently aimed at developing fines marketing systems, increasing throughput capacity, decreasing operation costs, and developing standardized continuous operator training. Testburns at industrial user sites were also conducted. A detailed process description; technical progress report including facility operations/plant production, facility testing, product testing, and testburn product; and process stability report are included. 3 figs., 8 tabs.

  2. National Writing Project Report. Evaluation of the Bay Area Writing Project. Technical Report.

    ERIC Educational Resources Information Center

    Stahlecker, James; And Others

    Prepared as part of the evaluation of the Bay Area Writing Project (BAWP), this report examines the National Writing Project (NWP) network, a group of teacher training projects designed to replicate the core model of the BAWP. The information provided in this report is divided into three sections. The first section summarizes information regarding…

  3. Assessing the Relationship between Ethical Project Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Howell, Byron Winter

    2010-01-01

    The purpose of this quantitative study was to assess the relationship between ethical project management and information technology (IT) project success. The success of IT projects is important for organizational success, but the rate of IT projects is historically low, costing billions of dollars annually. Using four key ethical variables…

  4. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  5. Technical Aspects Regarding the Management of Radioactive Waste from Decommissioning of Nuclear Facilities

    SciTech Connect

    Dragolici, F.; Turcanu, C. N.; Rotarescu, G.; Paunica, I.

    2003-02-25

    The proper application of the nuclear techniques and technologies in Romania started in 1957, once with the commissioning of the Research Reactor VVR-S from IFIN-HH-Magurele. During the last 45 years, appear thousands of nuclear application units with extremely diverse profiles (research, biology, medicine, education, agriculture, transport, all types of industry) which used different nuclear facilities containing radioactive sources and generating a great variety of radioactive waste during the decommissioning after the operation lifetime is accomplished. A new aspect appears by the planning of VVR-S Research Reactor decommissioning which will be a new source of radioactive waste generated by decontamination, disassembling and demolition activities. By construction and exploitation of the Radioactive Waste Treatment Plant (STDR)--Magurele and the National Repository for Low and Intermediate Radioactive Waste (DNDR)--Baita, Bihor county, in Romania was solved the management of radioactive wastes arising from operation and decommissioning of small nuclear facilities, being assured the protection of the people and environment. The present paper makes a review of the present technical status of the Romanian waste management facilities, especially raising on treatment capabilities of ''problem'' wastes such as Ra-266, Pu-238, Am-241 Co-60, Co-57, Sr-90, Cs-137 sealed sources from industrial, research and medical applications. Also, contain a preliminary estimation of quantities and types of wastes, which would result during the decommissioning project of the VVR-S Research Reactor from IFIN-HH giving attention to some special category of wastes like aluminum, graphite and equipment, components and structures that became radioactive through neutron activation. After analyzing the technical and scientific potential of STDR and DNDR to handle big amounts of wastes resulting from the decommissioning of VVR-S Research Reactor and small nuclear facilities, the necessity of

  6. Requirements management: keeping your technology acquisition project under control.

    PubMed

    Carr, J J

    2000-03-01

    Whether you are acquiring clinical or business information systems, patient monitoring systems, or therapeutic and diagnostic systems, the odds are good that the project will be delivered late, will cost far more than predicted, and will not provide all the features promised. The principal reason for project failure is improper management of the requirements of the system. Requirements engineering and management is a skill from the systems engineering profession that can be learned by nearly any professional who is managing a technology acquisition project. The author discusses what requirements engineering and management is and how it is done. PMID:10725942

  7. Final Technical Report of Project DE-FG02-96ER14647

    SciTech Connect

    Lundeen, Stephen R.

    2015-05-31

    This is the final technical report of work completed under DOE support over the period Sept. 1, 1996 until May 31, 2015. The title of the project was "Ion/Excited Atom Collision Studies with a Rydberg Target and a CO2 Laser" from 9/1/96 to 10/31/06, and "Properties of Actinide Ions from Measurements of Rydberg Ion Fine Structure" from 11/1/06 until 5/31/15. The primary technical results were a detailed experimental study of resonant charge transfer between Rydberg atoms and highly-charged ions, and unique measurements of many properties of multiply-charged Thorium ions.

  8. 15 CFR 292.3 - Technical tools, techniques, practices, and analyses projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... EXTRAMURAL PROGRAMS MANUFACTURING EXTENSION PARTNERSHIP; INFRASTRUCTURE DEVELOPMENT PROJECTS § 292.3... of tools, techniques, and practices which will aid manufacturing extension organizations in providing... not limited to, manufacturing assessment tools, benchmarking tools, business systems management...

  9. Organization and Management of Project Athena.

    ERIC Educational Resources Information Center

    Champine, George A.

    1991-01-01

    Project Athena is a $100 million, eight-year project to install a large network of high performance computer work stations for education and research at the Massachusetts Institute of Technology (MIT). Organizational, legal, and administrative aspects of the project allow two competitors (Digital Equipment Corporation and IBM) to work together…

  10. Construction Projects--Managing from "Outside the Frame."

    ERIC Educational Resources Information Center

    Christenson, James E.

    2002-01-01

    Describes the tasks of a construction project manager: listening, offering alternative solutions, translating needs into facilities components, assuring adequate funding, and tracking and facilitating the project. Also asserts that there should be one person handling all phases of the project for the customer. (EV)

  11. Project Execution Game (PEG): Training towards Managing Unexpected Events

    ERIC Educational Resources Information Center

    Zwikael, Ofer; Gonen, Amnon

    2007-01-01

    Purpose: Games are an effective teaching and classroom training tool, since they allow students to practise real-life events. In the area of project management, most games focus on the planning phase of a project. The current paper aims to describe a new game, called PEG--Project Execution Game. The uniqueness of this game is its focus on real…

  12. Technical Reference Suite Addressing Challenges of Providing Assurance for Fault Management Architectural Design

    NASA Technical Reports Server (NTRS)

    Fitz, Rhonda; Whitman, Gerek

    2016-01-01

    Research into complexities of software systems Fault Management (FM) and how architectural design decisions affect safety, preservation of assets, and maintenance of desired system functionality has coalesced into a technical reference (TR) suite that advances the provision of safety and mission assurance. The NASA Independent Verification and Validation (IVV) Program, with Software Assurance Research Program support, extracted FM architectures across the IVV portfolio to evaluate robustness, assess visibility for validation and test, and define software assurance methods applied to the architectures and designs. This investigation spanned IVV projects with seven different primary developers, a wide range of sizes and complexities, and encompassed Deep Space Robotic, Human Spaceflight, and Earth Orbiter mission FM architectures. The initiative continues with an expansion of the TR suite to include Launch Vehicles, adding the benefit of investigating differences intrinsic to model-based FM architectures and insight into complexities of FM within an Agile software development environment, in order to improve awareness of how nontraditional processes affect FM architectural design and system health management.

  13. Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan

    SciTech Connect

    Not Available

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

  14. Application of expert systems in project management decision aiding

    NASA Technical Reports Server (NTRS)

    Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David

    1987-01-01

    The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.

  15. Project Management of Randomized Clinical Trials: A Narrative Review

    PubMed Central

    Goodarzynejad, Hamidreza; Babamahmoodi, Abdolreza

    2015-01-01

    Context: A well-structured protocol for a clinical trial may be able to answer clinical questions, but it cannot be deemed enough to ensure success in the face of incompetent management of time as well as human and economic resources. To address this problem, in this article, we present our literature review on evidence as to how a good knowledge of proper management among researchers can enhance the likelihood of the success of clinical trial projects. Evidence Acquisition: Using multiple search strategies, we conducted a literature review on published studies in the English language from 2002 to 2012 by searching the Cochrane Database of Systematic Reviews, MEDLINE, Google Scholar, and EMBASE. Results: Our review suggests that a successful trial requires a work plan or work scope as well as a timeline. The trial manager should subsequently manage the study in accordance with the plan and the timeline. Many research units have called for a clinical project manager with scientific background and regulatory skills to effect coordination among various aspects of a clinical trial. Conclusions: Project management may benefit both the managerial and scientific aspects of medical projects and reduce fund waste. However, little has been written to date on project management in the context of clinical research. The suggestions represent the views of the individual authors. To provide a high level of evidence in this regard, we recommend that a randomized controlled trial be performed to compare trial projects progressed with and without the use of project management. PMID:26430517

  16. Better Information Management Policies Needed: A Study of Scientific and Technical Bibliographic Services.

    ERIC Educational Resources Information Center

    Comptroller General of the U.S., Washington, DC.

    This report discusses the management of scientific and technical bibliographic data bases by the Federal Government, the existence of overlapping and duplicative bibliographic information services, the application of cost recovery principles to bibliographic information services, and the need to manage information as a resource. Questionnaires…

  17. Technical Communications in OSS Content Management Systems: An Academic Institutional Case Study

    ERIC Educational Resources Information Center

    Cripps, Michael J.

    2011-01-01

    Single sourcing through a content management system (CMS) is altering technical communication practices in many organizations, including institutions of higher education. Open source software (OSS) solutions are currently among the most popular content management platforms adopted by colleges and universities in the United States and abroad. The…

  18. Business & Management Career Cluster ITAC for Career-Focused Education. Integrated Technical & Academic Competencies.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. Vocational Instructional Materials Lab.

    Designed for Ohio educators responsible for planning programs to prepare high school students for careers in business and management, this document presents an overview of Ohio's Integrated Technical and Academic Competencies (ITAC) system of career-focused education and specific information about the business and management ITAC career cluster.…

  19. Summative Evaluation: Behavior Management Training Program. Technical Report 31.2.

    ERIC Educational Resources Information Center

    Brownsmith, Keith; And Others

    Presented is the technical report of the Center for Innovation in Teaching the Handicapped behavior management training program designed to provide 86 regular and special education teacher-trainees with the skills necessary for dealing with classroom deviance. Reviewed in part I are the program's purpose (provide training in class management),…

  20. PUREX/UO{sub 3} deactivation project management plan

    SciTech Connect

    Washenfelder, D.J.

    1993-12-01

    From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.

  1. SSME Advanced Health Management: Project Overview

    NASA Technical Reports Server (NTRS)

    Plowden, John

    2000-01-01

    This document is the viewgraphs from a presentation concerning the development of the Health Management system for the Space Shuttle Main Engine (SSME). It reviews the historical background of the SSME Advanced Health Management effort through the present final Health management configuration. The document includes reviews of three subsystems to the Advanced Health Management System: (1) the Real-Time Vibration Monitor System, (2) the Linear Engine Model, and (3) the Optical Plume Anomaly Detection system.

  2. Managing Small Spacecraft Projects: Less is Not Easier

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    Managing small, low cost missions (class C or D) is not necessarily easier than managing a full flagship mission. Yet, small missions are typically considered easier to manage and used as a training ground for developing the next generation of project managers. While limited resources can be a problem for small missions, in reality most of the issues inherent in managing small projects are not the direct result of limited resources. Instead, problems encountered by managers of small spacecraft missions often derive from 1) the perception that managing small projects is easier if something is easier it needs less rigor and formality in execution, 2) the perception that limited resources necessitate or validate omitting standard management practices, 3) less stringent or unclear guidelines or policies for small projects, and 4) stakeholder expectations that are not consistent with the size and nature of the project. For example, the size of a project is sometimes used to justify not building a full, detailed integrated master schedule. However, while a small schedule slip may not be a problem for a large mission, it can indicate a serious problem for a small mission with a short development phase, highlighting the importance of the schedule for early identification of potential issues. Likewise, stakeholders may accept a higher risk posture early in the definition of a low-cost mission, but as launch approaches this acceptance may change. This presentation discusses these common misconceptions about managing small, low cost missions, the problems that can result, and possible solutions.

  3. The Flight of the Phoenix: Interpersonal Aspects of Project Management

    ERIC Educational Resources Information Center

    Huffman, Brian J.; Kilian, Claire McCarty

    2012-01-01

    Although many classroom exercises use movies to focus on management and organizational behavior issues, none of those do so in the context of project management. This article presents such an exercise using "The Flight of the Phoenix", an incredibly rich story for any management class, which provides clear examples of organizational behavior…

  4. Beyond the management and dissemination of projects' results: stakeholders involvement and project co-design

    NASA Astrophysics Data System (ADS)

    L'Astorina, Alba; Tomasoni, Irene; Basoni, Anna; Carrara, Paola

    2015-04-01

    Nowadays scientists are asked to undertake innovative and participative approaches in communicating the results of researches carried out within the various funding programs. In particular, Workpackages of Dissemination and Exploitation of results are considered mandatory at the European level helping the Project Management find innovative knowledge transfer strategies and enhance the project outcomes and impact. In this context, the involvement of stakeholders or users in research projects won a well-defined role and recent trends, in some cases, push to co-design research projects involving a pool of stakeholders or users in them from its first steps. Horizon 2020, the new EU Framework Programme for Innovation and Community financing system (2014-2020), moves clearly in this direction. CNR has an extensive experience in this kind of activity, both at the national and the international level and, in some cases, involve users and analyse their expectations using qualitative and quantitative surveys thus recognizing the role of users as research co-actors. Often products and services derived from research lack of attractiveness among enterprises, the Public Administrations and citizens, are due to the lack of an appropriate knowledge and consideration of the needs and requirements of such users. This paper intends to illustrate a case study where the analysis of the needs and requirements of the users were included in a specific Workpackage collaborating so both with the Project management and the Workpackage of Dissemination. The analysis were conducted within an ongoing project at CNR, i.e. Space4Agri (S4A): Development of Innovative Methodologies Aerospace Earth Observation in Support of the Sector agriculture in Lombardy. The main purpose of S4A is to contribute to the development of tools to improve the ability of the regional system in the planning and management of the agricultural sector Lombard, combining three domains that is scientific and technical areas

  5. Improving quality in a matrix management environment by documenting key processes using project management tools

    SciTech Connect

    Furaus, J.P.; Williams, J.L.; McKeever, P.S.; Figueroa-McInteer, C.; Glidewell, D.D.

    1993-07-01

    The Facilities Organization at Sandia has undergone many changes in the past five years. Management has made a commitment to improve the matrix management system and apply quality principles to the organization. This management commitment enabled Facilities to use project management tools for defining and documenting Facilities key processes. The resulting documentation included implementation plans for defining participant roles and responsibilities, identifying critical success factors, measuring performance, and ensuring continuous improvement. All of this resulted in benefits that demonstrate the value of project management and show how project management and quality are intertwined.

  6. Management/Technical Interaction in Integrated Information System Development.

    ERIC Educational Resources Information Center

    Bagley, Clarence H.; Gardner, Don E.

    The integrated information system element of the management information system concept has practical applications for management in the areas of both information analysis and decision-model building. Four basic options for achieving integration in operational data systems are: a default option, the coordinated file option, the distributed…

  7. Skills Conversion Project, Chapter 13, Solid Waste Management.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The Skills Conversion Project conducted by the National Society of Professional Engineers sought to study the transition mechanisms required to transfer available technical manpower from aerospace and defense industries into other areas of employment in private industry and public service. Fourteen study teams assessed the likelihood of future…

  8. Disabled Infants Project and Training & Technical Assistance Project. Final Reports: Innovations in Protective Services.

    ERIC Educational Resources Information Center

    Flores, Joe G., Jr.

    The goal of the Disabled Infants Project was to develop and implement a plan for updating child protective services in Texas to assure the protection of infants as required by the Child Abuse Amendments of 1984. As a result of the project, the Texas Department of Human Services has in place both policy and mechanisms which guide and enable…

  9. 12 strategies for managing capital projects.

    PubMed

    Stoudt, Richard L

    2013-05-01

    To reduce the amount of time and cost associated with capital projects, healthcare leaders should: Begin the project with a clear objective and a concise master facilities plan. Select qualified team members who share the vision of the owner. Base the size of the project on a conservative business plan. Minimize incremental program requirements. Evaluate the cost impact of the building footprint. Consider alternative delivery methods. PMID:23678692

  10. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78 Section 301.607-78 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL...

  11. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78 Section 301.607-78 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL...

  12. Waste Management Program. Technical progress report, October-December 1982

    SciTech Connect

    1983-07-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, in situ storage or disposal, waste from development and characterization, process and equipment development, and low-level waste management are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  13. The Clearlake Hot Dry Rock geothermal project: Institutional policies, administrative issues, and technical tasks

    SciTech Connect

    Burns, K.L.

    1991-01-01

    The Clearlake Project is a three-party collaboration between the California Energy Commission, City of Clearlake, and Los Alamos National Laboratory. It aims to develop a deep hot, dry geothermal resource under the city. The project is funded by the Commission, and administered by the City. Technical operations are conducted by Laboratory staff and resources seconded from the Hot Dry Rock program. In addition to the normal geothermal exploration problems of predicting geological and geophysical properties of the subsurface, there are uncertainties as to what further material and environmental parameters are relevant, and how they might be measured. In addition to technical factors, policy objectives are an influence in choosing the most appropriate development scenario. 11 refs., 4 figs.

  14. Non-Profit/Higher Education Project Management Series: The Project Plan

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  15. Translating global climate model projections into usable information for water managers and industry: A case study from Tasmania, Australia

    NASA Astrophysics Data System (ADS)

    Bennett, J.; Ling, F.; Graham, B.; Grose, M.; Corney, S.; Holz, G.; White, C.; Gaynor, S.; Bindoff, N.

    2010-09-01

    Translating meteorological projections from global climate models (GCMs) into useful information for water managers and industry involves addressing a combination of technical and communication challenges. The Climate Futures for Tasmania project has projected water yield in Tasmania, Australia to 2100. This paper describes how the Climate Futures for Tasmania project successfully translated climate projections into useable information for water managers and industry. From its inception, the Climate Futures for Tasmania project has maintained a dialogue with the two major water managers in the Tasmania: the Department of Primary Industry, Parks, Water and Environment (DPIPWE), the government body with statutory responsibility for water management in Tasmania, and Hydro Tasmania, Australia's largest hydropower generator. Frequent discussions with these two organisations directed the technical research into future water yields. Tasmania is a difficult region for climate change-hydrology studies. Tasmania's complex rainfall patterns are not replicated by GCMs, and hence GCMs produce information that is too general to be useful to Tasmanian water managers. To overcome this problem, GCM projections were downscaled to a finer spatial resolution. Downscaling greatly improved the spatial correlation of modelled rainfall with observations, and accordingly the usefulness of the projections to water managers. The downscaled climate projections were fed into hydrological models to produce projections of streamflow. The hydrological modelling involved two steps: 1. Runoff modelling - calculating statewide, gridded natural runoff at a resolution of 0.05 degrees 2. River system modelling - aggregating the gridded natural runoff to 65 Tasmanian river basins and then accounting for human activities in rivers including dams, irrigation and hydropower generation. Splitting the hydrological modelling into these two steps allows the effects of climate and human activity to be

  16. The ESO Product Data Management System — A New Home for ESO's Technical Documents

    NASA Astrophysics Data System (ADS)

    Kraus, M.; Tamai, R.; Jolley, P.; Hess, G.

    2013-09-01

    Originally the technical archives at ESO grew organically and lacked a single coherent storage and access system. A search for a powerful product data management (PDM) system to unify the document archives of observatory, telescope and instrument technical material was initiated. After a careful assessment of the possible systems, it was decided to implement the Kronodoc system and its recent introduction as the ESO PDM system is described.

  17. Technical Seminar: "Modeling and Optimization in Air Traffic Management"

    NASA Video Gallery

    Traffic Flow Management (TFM) is the efficient organization of traffic flows to meet demand taking into account capacity constraints at airports and in en route airspace. TFM involves thousands of ...

  18. K-12 Project Management Education: NASA Hunch Projects

    ERIC Educational Resources Information Center

    Morgan, Joe; Zhan, Wei; Leonard, Matt

    2013-01-01

    To increase the interest in science, technology, engineering, and math (STEM) among high school students, the National Aeronautics and Space Administration (NASA) created the "High Schools United with NASA to Create Hardware" (HUNCH) program. To enhance the experience of the students, NASA sponsored two additional projects that require…

  19. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  1. Planning "and" Sprinting: Use of a Hybrid Project Management Methodology within a CIS Capstone Course

    ERIC Educational Resources Information Center

    Baird, Aaron; Riggins, Frederick J.

    2012-01-01

    An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…

  2. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  3. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  4. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  5. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  6. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  7. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  8. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  9. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  10. SUMA (Supply Management Project), a management tool for post-disaster relief supplies.

    PubMed

    de Ville de Goyet, C; Acosta, E; Sabbat, P; Pluut, E

    1996-01-01

    Frequently in the wake of disasters, large amounts of humanitarian supplies arrive from multiple sources within the country or from abroad. Only a portion of these donations actually responds to specific requests from the affected country. A significant part consists of unsolicited donations whose value--in terms of meeting immediate, life-threatening needs--is questioned by many disaster managers. In 1990, WHO initiated a supply management project, known as "SUMA", to provide national authorities with a management tool and the skills to sort and inventory large amounts of relief supplies in a short period of time. It is a technical cooperation programme to assist the local coordinating agency to get an accurate picture of what is potentially available in the affected area, and to sort the most valuable relief items from those of doubtful usefulness. National authorities have developed their SUMA teams in many situations, both in Latin America and the Caribbean; this article describes three of these experiences. A flood in Costa Rica, in 1995, where the Red Cross assumed national responsibility for managing relief supplies donated locally. The earthquake in Paéz, Colombia, also in 1995, where the National Disaster Committee activated SUMA for all supplies sent to the disaster area, with the exception of specialized health shipments channelled through the Ministry of Health. In Haiti, in 1994, a complex disaster was compounded by a tropical storm. All civilian supplies arriving at the airport were processed by the SUMA team which included customs officers among its members. The traditional problem of unsorted and inappropriate supplies, noted in most international disasters, seems to have been negligible, a trend which can perhaps be credited to 20 years of preparedness activities in Latin America and the Caribbean. The superficial analysis of the data underlines the potential for operational research on the standardized databases generated by SUMA. PMID:9170233

  11. Bridging the Divide between Safety and Risk Management for your Project or Program

    NASA Technical Reports Server (NTRS)

    Lutomski, Mike

    2005-01-01

    This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.

  12. Project DEEP STEAM: fourth meeting of the technical advisory panel, Albuquerque, NM, November 1980

    SciTech Connect

    Fox, R.L.; Donaldson, A.B.; Eisenhawer, S.W.; Hart, C.M.; Johnson, D.R.; Mulac, A.J.; Wayland, J.R.; Weirick, L.J.

    1981-07-01

    The Fourth Project DEEP STEAM Technical Advisory Panel Meeting was held on 5 and 6 November 1980 in Albuquerque, New Mexico, to review the status of project DEEP STEAM. This Proceedings, following the order of the meeting, is divided into five main sections: the injection string modification program, the downhole steam generator program, supporting activities, field testing, and the Advisory Panel recommendations and discussion. Each of the 17 presentations is summarized, and a final Discussion section has been added, when needed, for inclusion of comments and replies related to specific presentations. Finally, the Advisory Panel recommendations and the ensuing discussion are summarized in the closing section.

  13. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    NASA Astrophysics Data System (ADS)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  14. West Hackberry Tertiary Project. Quarterly technical progress report, March 3, 1993--June 3, 1994

    SciTech Connect

    Gillham, T.H.

    1994-09-01

    The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility of combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoir for the project is the Camerina C-1,2,3 Sand located on the West Flank of West Hackberry Field in Cameron Parish, Louisiana. This reservoir has been unitized and is designated as the WH Cam C RI SU. If successful, this project will demonstrate that the use of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presently uneconomic.

  15. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    SciTech Connect

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  16. Person-Centered Management in Project Administration.

    ERIC Educational Resources Information Center

    Caraway, James E.

    The theories of several contemporary management theorists are examined in order to demonstrate that their administrative stance is that of a person-intensive approach to management. After exploring leadership theory and the positions of Douglas McGregor, John J. Morse, Jay W. Lorsch, Rensis Likert, Bernard M. Bass, William Reddin, George H. Rice,…

  17. What research project management in Earth sciences really means

    NASA Astrophysics Data System (ADS)

    Cristini, Luisa; Lampitt, Richard; Alexiou, Sofia

    2015-04-01

    Since much earlier than at the start of a research project, principal investigators and project coordinators have responsibilities that go far beyond their scientific interests. Management and communication skills are essential to build those working relationships that will result in a successful proposal as well as to disseminate project outputs to the funding agencies and the public sector. Starting from the cases of the FixO3 project and the previous EuroSITES, two EU-funded collaborative projects in observational oceanography, we show practical examples of typical management issues in research projects from the initial phase of outlining and submitting a proposal to the project implementation and reporting of the results.

  18. Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383

    SciTech Connect

    Duncan, Garth M.; Saunders, Scott A.

    2013-07-01

    The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two different prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation

  19. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Cancer.gov

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  20. The Role of the Project Management Office on Information Technology Project Success

    ERIC Educational Resources Information Center

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…