Science.gov

Sample records for railroad facility operations

  1. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning...

  2. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning...

  3. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning...

  4. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning...

  5. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall...

  6. 77 FR 75701 - Landisville Railroad, LLC-Operation Exemption-Buckeye East Chicago Railroad LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Surface Transportation Board Landisville Railroad, LLC--Operation Exemption--Buckeye East Chicago Railroad LLC Landisville Railroad, LLC (Landisville), a Class III rail carrier, has filed a verified notice of... railroad right-of-way, and bulk liquid transloading facilities owned by Buckeye East Chicago Railroad,...

  7. 75 FR 11224 - Albany & Eastern Railroad Company-Acquisition and Operation Exemption-Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... TRANSPORTATION Surface Transportation Board Albany & Eastern Railroad Company--Acquisition and Operation Exemption--Union Pacific Railroad Company and Willamette & Pacific Railroad, Inc. Albany & Eastern Railroad...) Acquire the rail freight easement from Union Pacific Railroad Company (UP), the current owner of the...

  8. 76 FR 50326 - Tyburn Railroad, LLC-Acquisition and Operation Exemption-Tyburn Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Surface Transportation Board Tyburn Railroad, LLC--Acquisition and Operation Exemption--Tyburn Railroad Company Tyburn Railroad, LLC (Tyburn), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Tyburn Railroad Company and operate approximately 0.9 miles of rail lines...

  9. Control of railroad operations: Algorithms and economics

    SciTech Connect

    Harker, P.

    1994-12-31

    This paper presents the results of a seven-year research effort to apply optimization models and techniques to improve productivity and reliability of freight railroad operations. After describing the basic modelling framework, a series of optimization models will be described in detail along with the results of their application. The paper ends with a discussion of the future research opportunities in this area.

  10. 76 FR 52384 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... used by the railroads to adjust their gross annual operating revenues for classification purposes. This indexing methodology insures that railroads are classified based on real business expansion and not...

  11. 78 FR 21007 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ... TRANSPORTATION Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... used by the railroads to adjust their gross annual operating revenues for classification purposes. This indexing methodology insures that railroads are classified based on real business expansion and not...

  12. 75 FR 57553 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... used by the railroads to adjust their gross annual operating revenues for classification purposes. This indexing methodology insures that railroads are classified based on real business expansion and not...

  13. 77 FR 34125 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... used by the railroads to adjust their gross annual operating revenues for classification purposes. This indexing methodology insures that railroads are classified based on real business expansion and not...

  14. 62. RAILROAD FACILITIES, TRUCKING PASSAGE, MAIL TRANSPORT AREA, ACCESS TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. RAILROAD FACILITIES, TRUCKING PASSAGE, MAIL TRANSPORT AREA, ACCESS TO POST OFFICE BUILDING, VIEW TO WEST - Terminal Tower Building, Cleveland Union Terminal, 50 Public Square, Cleveland, Cuyahoga County, OH

  15. 75 FR 66421 - HC Railroad, LLC-Acquisition and Operation Exemption-Honey Creek Railroad, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF TRANSPORTATION Surface Transportation Board HC Railroad, LLC--Acquisition and Operation Exemption--Honey Creek... 1150.31 to acquire from the Honey Creek Railroad (HCR), and to operate 6.4 miles of HCR's rail...

  16. 77 FR 50762 - Arkansas-Oklahoma Railroad, Inc.-Lease and Operation Exemption-Line of Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... Surface Transportation Board Arkansas-Oklahoma Railroad, Inc.--Lease and Operation Exemption-- Line of Union Pacific Railroad Company Arkansas-Oklahoma Railroad, Inc. (AOK), a Class III rail carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to lease from Union Pacific Railroad...

  17. 77 FR 38884 - Wyoming Connect Railroad LLC-Acquisition and Operation Exemption-Union Pacific Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Surface Transportation Board Wyoming Connect Railroad LLC--Acquisition and Operation Exemption--Union Pacific Railroad Company Wyoming Connect Railroad LLC (WCR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire by lease from Union Pacific Railroad Company and to...

  18. 75 FR 18254 - R.J. Corman Railroad Company/Bardstown Line-Lease and Operation Exemption-R.J. Corman Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... Surface Transportation Board R.J. Corman Railroad Company/Bardstown Line--Lease and Operation Exemption--R.J. Corman Railroad Property, LLC R.J. Corman Railroad Company/Bardstown Line (RJC Railroad Company... from R.J. Corman Railroad Property, LLC (RJC Railroad Property), and to operate approximately 42...

  19. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  20. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  1. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  2. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  3. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  4. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad operating employees in deadhead status...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.311 Railroad operating employees in deadhead status. (a) Notwithstanding any other restrictions...

  5. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad operating employees in deadhead status...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.311 Railroad operating employees in deadhead status. (a) Notwithstanding any other restrictions...

  6. 75 FR 6790 - Nebraska Northwestern Railroad, Inc.-Acquisition and Operation Exemption-Dakota, Minnesota...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... Surface Transportation Board Nebraska Northwestern Railroad, Inc.--Acquisition and Operation Exemption--Dakota, Minnesota & Eastern Railroad Corporation Nebraska Northwestern Railroad, Inc. (NNW), a noncarrier... Dakota, Minnesota & Eastern Railroad Corporation (DM&E) and to operate approximately 28.1 miles of...

  7. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... regulations and railroad operating rules. 220.43 Section 220.43 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS... regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  8. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad operating employees in deadhead status...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.311 Railroad operating employees in deadhead status. (a) Notwithstanding any other restrictions...

  9. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad operating employees in deadhead status...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.311 Railroad operating employees in deadhead status. (a) Notwithstanding any other restrictions...

  10. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad operating employees in deadhead status...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.311 Railroad operating employees in deadhead status. (a) Notwithstanding any other restrictions...

  11. 76 FR 28850 - Northern Plains Railroad, Inc.-Intra-Corporate Family Operation Exemption-Mohall Central Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... transaction within a corporate family of the type specifically exempted from prior review and approval under... Surface Transportation Board Northern Plains Railroad, Inc.--Intra-Corporate Family Operation Exemption... family. The transaction allows NPR to continue to operate the rail line of Mohall Central Railroad,...

  12. 76 FR 68523 - Utah Southern Railroad Company, LLC-Change in Operators Exemption-Iron Bull Railroad Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... Surface Transportation Board Utah Southern Railroad Company, LLC--Change in Operators Exemption--Iron Bull... of exemption under 49 CFR 1150.31 to change operators from Iron Bull Railroad Company (IBRC) to USRC... near Iron Springs, Utah, and milepost 14.7 at or near Iron Mountain, Utah, a distance of 14.6 miles...

  13. The Nevada railroad system: Physical, operational, and accident characteristics

    SciTech Connect

    1991-09-01

    This report provides a description of the operational and physical characteristics of the Nevada railroad system. To understand the dynamics of the rail system, one must consider the system`s physical characteristics, routing, uses, interactions with other systems, and unique operational characteristics, if any. This report is presented in two parts. The first part is a narrative description of all mainlines and major branchlines of the Nevada railroad system. Each Nevada rail route is described, including the route`s physical characteristics, traffic type and volume, track conditions, and history. The second part of this study provides a more detailed analysis of Nevada railroad accident characteristics than was presented in the Preliminary Nevada Transportation Accident Characterization Study (DOE, 1990).

  14. 77 FR 31067 - Cleveland Harbor Belt Railroad-Operation Exemption-Cleveland-Cuyahoga County Port Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Surface Transportation Board Cleveland Harbor Belt Railroad--Operation Exemption--Cleveland- Cuyahoga County Port Authority Cleveland Harbor Belt Railroad (CHB), a noncarrier, has filed a verified notice of... Commercial Railroad Company, LLC--Continuance in Control Exemption--Cleveland Harbor Belt Railroad, Docket...

  15. 77 FR 10617 - Wellsboro & Corning Railroad, LLC-Acquisition and Operation Exemption-Wellsboro & Corning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... Surface Transportation Board Wellsboro & Corning Railroad, LLC--Acquisition and Operation Exemption--Wellsboro & Corning Railroad Company Wellsboro & Corning Railroad, LLC (WCLLC), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Wellsboro & Corning Railroad Company...

  16. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... facilities on railroad conveyances. (a) Both kitchens and pantries of cars hereafter constructed...

  17. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... facilities on railroad conveyances. (a) Both kitchens and pantries of cars hereafter constructed...

  18. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... facilities on railroad conveyances. (a) Both kitchens and pantries of cars hereafter constructed...

  19. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... facilities on railroad conveyances. (a) Both kitchens and pantries of cars hereafter constructed...

  20. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... facilities on railroad conveyances. (a) Both kitchens and pantries of cars hereafter constructed...

  1. 76 FR 21425 - Rocky Mountain Railcar and Repair, Inc.-Acquisition and Operation Exemption-Line of Railroad in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... Surface Transportation Board Rocky Mountain Railcar and Repair, Inc.--Acquisition and Operation Exemption--Line of Railroad in Tooele County, UT Rocky Mountain Railcar and Repair, Inc. (Rocky Mountain), a... line. \\1\\ Rocky Mountain states that it currently operates a railcar repair facility, but that it...

  2. Mutual design: Overhead transmission lines and railroad facilities: Susceptibility program: Final report

    SciTech Connect

    Frazier, M.J.; Little, D.R.

    1989-07-01

    The sharing of common corridors by electric power transmission lines and railroad facilities can result in the coupling of unwanted electromagnetic energy from the power lines into nearby railroad systems. The coupling can result in voltage being induced onto the railroad system conductors that may compromise the inherent safety and reliability of the railroad signalling system. This broad-scoped research program, which is co-sponsored by EPRI and the AAR, is addressing the problem from two directions. This two volume report describes a Phase 1 effort to develop the methods and techniques for quantifying the signal system response to interference. 54 figs., 7 tabs.

  3. 75 FR 68398 - Texas, Oklahoma & Eastern Railroad, LLC-Acquisition and Operation Exemption-Texas, Oklahoma...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... Surface Transportation Board Texas, Oklahoma & Eastern Railroad, LLC--Acquisition and Operation Exemption--Texas, Oklahoma & Eastern Railroad Company Texas, Oklahoma & Eastern Railroad, LLC (TOE), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Texas,...

  4. 77 FR 19417 - Affton Terminal Railroad Company-Operation Exemption1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... TRANSPORTATION Surface Transportation Board Affton Terminal Railroad Company--Operation Exemption\\1\\--Affton Trucking Company Affton Terminal Railroad Company (ATRR), a noncarrier, has filed a verified notice of... related products with the Terminal Railroad Association of St. Louis and BNSF Railway Company and...

  5. 77 FR 27857 - Kingman Terminal Railroad, LLC-Operation Exemption-Kingman Airport Authority, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... Surface Transportation Board Kingman Terminal Railroad, LLC--Operation Exemption--Kingman Airport Authority, Inc. Kingman Terminal Railroad, LLC (KTRR), a noncarrier, has filed a verified notice of....--Continuance in Control Exemption--Kingman Terminal Railroad, LLC, Docket No. FD 35619, wherein...

  6. 76 FR 39156 - R. J. Corman Railroad Company/Bardstown Line-Lease and Operation Exemption-R. J. Corman Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... Register on April 9, 2010 (75 FR 18,254), and became effective on April 25, 2010. On May 28, 2010, RJC... Surface Transportation Board R. J. Corman Railroad Company/Bardstown Line--Lease and Operation Exemption--R. J. Corman Railroad Property, LLC R. J. Corman Railroad Company/Bardstown Line (RJC...

  7. 75 FR 7152 - Stillwater Central Railroad, Inc.-Lease and Operation Exemption-Hollis & Eastern Railroad L.L.C.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Stillwater Central Railroad, Inc.--Lease and Operation Exemption--Hollis... verified notice of exemption under 49 CFR 1150.41 to lease and to operate, pursuant to a lease...

  8. 76 FR 27173 - Carolina Coastal Railway, Inc.-Acquisition and Operation Exemption-Rocky Mount & Western Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... Surface Transportation Board Carolina Coastal Railway, Inc.--Acquisition and Operation Exemption--Rocky Mount & Western Railroad Co., Inc. d/b/a Nash County Railroad Carolina Coastal Railway, Inc. (CLNA), a... Rocky Mount & Western Railroad Co., Inc. d/b/a Nash County Railroad (NCR), and to operate,...

  9. 78 FR 54955 - Mississippi Central Railroad Co.-Lease and Change in Operators Exemption-Line of Mississippi...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... Surface Transportation Board Mississippi Central Railroad Co.--Lease and Change in Operators Exemption--Line of Mississippi-Alabama Railroad Authority Mississippi Central Railroad Co. (MSCI), a Class III...-mile line of railroad between milepost IC-529.5 (Corinth, Miss.) and milepost IC-571.0 (Red Bay,...

  10. 77 FR 65446 - Turtle Creek Industrial Railroad, Inc.-Acquisition and Operation Exemption-Consolidated Rail...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Turtle Creek Industrial Railroad, Inc.--Acquisition and Operation Exemption--Consolidated Rail Corporation Turtle Creek Industrial Railroad, Inc. (TCKR), a noncarrier and a wholly...

  11. 77 FR 38884 - Sisseton Milbank Railroad Company-Acquisition and Operation Exemption-SLA Property Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Surface Transportation Board Sisseton Milbank Railroad Company--Acquisition and Operation Exemption--SLA... or near Milbank and approximate railroad milepost 38.0 in or near Sisseton, in Grant and Roberts... the Trust in the near future. The parties expect to consummate the transaction on or after July...

  12. 75 FR 82426 - Big Four Terminal Railroad, LLC-Operation Exemption-RMW Ventures, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Big Four Terminal Railroad, LLC--Operation Exemption--RMW Ventures, LLC Big Four Terminal Railroad, LLC (BFTR), has filed a verified notice of exemption under 49 CFR 1150.31...

  13. 76 FR 13445 - Lycoming Valley Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Lycoming Valley Railroad Company-Operation Exemption--SEDA--COG Joint Rail Authority Lycoming Valley Railroad Company (LVRR), a Class III carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to...

  14. 76 FR 13445 - North Shore Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board North Shore Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority North Shore Railroad Company (NSRR), a Class III carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to...

  15. 76 FR 13446 - Juniata Valley Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Juniata Valley Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority Juniata Valley Railroad Company (JVRR), a Class III carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to...

  16. 76 FR 22746 - Wiregrass Central Railway, LLC-Acquisition and Operation Exemption-Wiregrass Central Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Surface Transportation Board Wiregrass Central Railway, LLC--Acquisition and Operation Exemption--Wiregrass Central Railroad Company, Inc. Wiregrass Central Railway, LLC (WCR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Wiregrass Central Railroad Company,...

  17. Mutual design: Overhead Transmission Lines and Railroad Facilities Susceptibility Program, Phase 2: Volume 1, Railroad track interference-susceptibility tester design and testing; Volume 2, Set-up and LFETC test plan; Volume 3, Fabrication information. Final report

    SciTech Connect

    Frazier, M.J.; Little, D.R.

    1995-09-01

    The sharing of corridors by electric power-transmission lines and railroad facilities results in coupling of electromagnetic energy from the power lines into nearby railroad systems. This electromagnetic coupling can induce voltage levels onto the railroad signaling system that can adversely affect the operation of these systems. The development and rapid deployment of sophisticated solid-state electronic track-signaling systems and the continued increase in demand for power will make this problem more serious, as additional joint railroad/electricutility common corridors will be needed and as power-system upgrades for existing corridors will be initiated. This three-volume report describes the development of a laboratory railroad-track simulator/interference-susceptibility tester. This simulator permits track-circuit signaling and grade-crossing systems to be tested in the laboratory to determine their susceptibility to power-line interference that is coupled to the rails for a wide range of realistic normal and abnormal signal-system operating conditions, block-length arrangements, and interference conditions. The simulator provides an accurate electrical analogue of the track system, including frequency-dependent rail skin-effect impedance, signal attenuation, and controlled-ballast variation. The simulator can be used to investigate the effects of both longitudinal and differential interference excitation of the rails.

  18. 75 FR 45011 - Gardendale Railroad, Inc.-Operation Exemption-Rail Line of Border Transload & Transfer, Inc. at...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    .... (BTT) (formerly known as Texas Railroad Switching, Inc. (TRS)).\\1\\ \\1\\ In 1990, CCR received an exemption to acquire a 53.41-mile line of railroad and TRS received an exemption to lease and operate...

  19. 78 FR 24465 - Ballard Terminal Railroad Company, L.L.C.-Acquisition and Operation Exemption-Woodinville...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... Surface Transportation Board Ballard Terminal Railroad Company, L.L.C.--Acquisition and Operation...; request for comments. SUMMARY: On April 2, 2013, Ballard Terminal Railroad Company, L.L.C. (Ballard), a... the Line at issue here. Ballard Terminal Railroad Company, L.L.C.--Lease Exemption--Line of...

  20. 75 FR 63532 - Lancaster & Chester Railroad, LLC-Acquisition and Operation Exemption-Line of Lancaster & Chester...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Surface Transportation Board Lancaster & Chester Railroad, LLC--Acquisition and Operation Exemption--Line of Lancaster & Chester Railway Company Lancaster & Chester Railroad, LLC (L&C Railroad), a noncarrier... miles of rail line owned by Class III rail carrier Lancaster & Chester Railway Company as follows:...

  1. 77 FR 14058 - Santa Teresa Southern Railroad, LLC-Operation Exemption-Rail Line of Verde Logistics Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... Logistics Railroad, LLC at Santa Teresa, Dona Ana County, NM Santa Teresa Southern Railroad, LLC (STSR), a... feet of rail line owned by Verde Logistics Railroad, LLC (Verde). The rail line extends between a point... to shippers and receivers located in the Santa Teresa Logistics Industrial Park. \\1\\ STSR states...

  2. 76 FR 5649 - Tongue River Railroad Company, Inc.-Construction and Operation-Western Alignment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... Surface Transportation Board Tongue River Railroad Company, Inc.--Construction and Operation-- Western... Montana. A final decision authorizing TRRC's construction and operation was issued in October, 2007. The... process. The Tribes are concerned about impacts related to the rail line construction and operation...

  3. 76 FR 77890 - Swan Ranch Railroad, L.L.C.-Operation Exemption-Swan Industrial Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Swan Ranch Railroad, L.L.C.--Operation Exemption--Swan Industrial Park Swan... located within the Swan Industrial Park, in Cheyenne, Wyo. The track over which SRR will operate...

  4. 75 FR 11991 - ABC & D Recycling, Inc.-Lease and Operation Exemption-a Line of Railroad in Ware, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... Surface Transportation Board ABC & D Recycling, Inc.--Lease and Operation Exemption--a Line of Railroad in... under 49 CFR 1150.31 to lease from O'Riley Family Trust (O'Riley), and to operate 773 feet of rail line... lease and operate the railroad trackage owned by O'Riley. ABC & D states that it has and intends...

  5. 76 FR 22745 - Three Notch Railway, LLC-Acquisition and Operation Exemption-Three Notch Railroad Co., Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Surface Transportation Board Three Notch Railway, LLC--Acquisition and Operation Exemption-- Three Notch Railroad Co., Inc. Three Notch Railway, LLC (TNRW), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Three Notch Railroad Co., Inc. (TNHR) and to operate...

  6. 78 FR 24803 - Hilco SP Rail, LLC-Acquisition and Operation Exemption-RG Steel Railroad Holding, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... Surface Transportation Board Hilco SP Rail, LLC--Acquisition and Operation Exemption--RG Steel Railroad Holding, LLC Hilco SP Rail, LLC (Hilco), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from RG Steel Railroad Holding, LLC, and operate as a common carrier over...

  7. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  8. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  9. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  10. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  11. 78 FR 41994 - RSL Railroad LLC-Operation Exemption-Massillon Energy & Technology Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board RSL Railroad LLC--Operation Exemption--Massillon Energy & Technology Park On... milepost 1.27 (the Line), pursuant to an agreement with Massillon Energy & Technology Park (Massillon),...

  12. 78 FR 30965 - AG Valley Railroad, LLC-Operation Exemption-Ag Valley Holdings, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board AG Valley Railroad, LLC--Operation Exemption--Ag Valley Holdings, LLC AG... original and 10 copies of all pleadings, referring to Docket No. FD 35736, must be filed with the...

  13. 75 FR 59579 - Restrictions on Railroad Operating Employees' Use of Cellular Telephones and Other Electronic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... 19 percent tend to pull over to a stop to place the call. Ten percent stated they never dial while... electronic devices by railroad operating employees. 75 FR 27672 (May 18, 2010). The NPRM proposed to codify many of the requirements of Emergency Order 26 (Order or EO 26, 73 FR 58702 (Oct. 7, 2008)),...

  14. 76 FR 15047 - Port of Ivory, LLC-Operation Exemption-Line of Railroad in Tulare County, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... Surface Transportation Board Port of Ivory, LLC--Operation Exemption--Line of Railroad in Tulare County, CA Port of Ivory, LLC (Port), a limited liability company and noncarrier, has filed a verified notice... Valley Railroad Company (SJVR) at a point known as Ivory (milepost 232.3 on SJVR's Exeter...

  15. 76 FR 13446 - Nittany Bald and Eagle Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Surface Transportation Board Nittany Bald and Eagle Railroad Company-Operation Exemption-SEDA- COG Joint Rail Authority Nittany Bald and Eagle Railroad Company (N&BE), a Class III carrier, has filed a... the Board in Susquehanna Union R.R.-Control Exemption- N. Shore R.R., Nittany & Bald Eagle...

  16. 76 FR 16654 - Austin Western Railroad, L.L.C.-Lease and Operation Exemption-Capital Metropolitan Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Austin Western Railroad, L.L.C.--Lease and Operation Exemption-- Capital Metropolitan Transportation Authority Austin Western Railroad, L.L.C. (AWRR), a Class III rail carrier,...

  17. 78 FR 338 - Buckeye Hammond Railroad, L.L.C.; Acquisition and Operation Exemption; Buckeye Partners, L.P.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-03

    ... Surface Transportation Board Buckeye Hammond Railroad, L.L.C.; Acquisition and Operation Exemption; Buckeye Partners, L.P. Buckeye Hammond Railroad, L.L.C. (BHRR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 \\1\\ to acquire from Buckeye Partners, L.P., a noncarrier, and...

  18. 75 FR 61817 - Jackson & Lansing Railroad Company-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Surface Transportation Board Jackson & Lansing Railroad Company--Lease and Operation Exemption--Norfolk Southern Railway Company Under 49 CFR 1011.7(b)(10), the Director of the Office of Proceedings (Director... & Lansing Railroad Company (JAIL), a noncarrier, has filed a verified notice of exemption under 49 CFR...

  19. 76 FR 22746 - Conecuh Valley Railway, LLC-Acquisition and Operation Exemption-Conecuh Valley Railroad Co., Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Surface Transportation Board Conecuh Valley Railway, LLC--Acquisition and Operation Exemption--Conecuh Valley Railroad Co., Inc. Conecuh Valley Railway, LLC (CVR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Conecuh Valley Railroad Co., Inc. (COEH), and to...

  20. 76 FR 12224 - Autauga Northern Railroad, L.L.C.-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Surface Transportation Board Autauga Northern Railroad, L.L.C.--Lease and Operation Exemption--Norfolk Southern Railway Company Autauga Northern Railroad, L.L.C. (ANRR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire by lease from Norfolk Southern Railway Company...

  1. 75 FR 7537 - Elkhart & Western Railroad Co.-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... Surface Transportation Board Elkhart & Western Railroad Co.--Lease and Operation Exemption-- Norfolk Southern Railway Company Elkhart & Western Railroad Co. (EWR), a Class III rail carrier,\\1\\ has filed a... (Agreement) \\2\\ with Norfolk Southern Railway Company (NSR), approximately 23.0 miles of NSR's rail...

  2. 78 FR 802 - Heart of Texas Railroad, L.P.-Acquisition and Operation Exemption-Gulf Colorado & San Saba...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... Surface Transportation Board Heart of Texas Railroad, L.P.--Acquisition and Operation Exemption--Gulf Colorado & San Saba Railway Company Heart of Texas Railroad, L.P. (the Company), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Gulf Colorado & San Saba Railway...

  3. 76 FR 75602 - Hilton & Albany Railroad, Inc.-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... TRANSPORTATION Surface Transportation Board Hilton & Albany Railroad, Inc.--Lease and Operation Exemption-- Norfolk Southern Railway Company Hilton & Albany Railroad, Inc. (HAL), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to lease from Norfolk Southern Railway Company (NSR) and...

  4. 77 FR 55268 - Union Pacific Railroad Company-Acquisition and Operation Exemption-San Pedro Railroad Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ..., LLC's (SPROC) line segments between MP 1040.15 at Curtiss, Ariz., and MP 1041.32 near Curtiss (Parcel... property rights, including SPROC's freight operating easement, in a line segment between MP 1041.32 and...

  5. 77 FR 72907 - Western Washington Railroad, LLC-Lease and Operation Exemption-City of Tacoma, Department of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ...-- City of Tacoma, Department of Public Works On November 20, 2012, Western Washington Railroad, LLC (WWRR... CFR 1150.31 to lease from the City of Tacoma, Department of Public Works (Tacoma Rail) and operate...

  6. 76 FR 75600 - Port Rail Link, Inc.-Acquisition and Operation Exemption-Rail Lines of Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Union Pacific Railroad Company and The Lake Charles Harbor and Terminal District Port Rail Link, Inc... Harbor and Terminal District (the District), operator ] of the Port of Lake Charles (the Port),...

  7. 78 FR 36017 - MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-Operation Exemption-Hilco SP Rail, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... Railroad Holding, LLC, FD 35734 (STB served Apr. 26, 2013); 78 FR 24,803 (Apr. 26, 2013). MCM's notice was... Surface Transportation Board MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-- Operation Exemption--Hilco SP Rail, LLC MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad (MCM), a...

  8. Designing Facilities for Collaborative Operations

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey; Powell, Mark; Backes, Paul; Steinke, Robert; Tso, Kam; Wales, Roxana

    2003-01-01

    A methodology for designing operational facilities for collaboration by multiple experts has begun to take shape as an outgrowth of a project to design such facilities for scientific operations of the planned 2003 Mars Exploration Rover (MER) mission. The methodology could also be applicable to the design of military "situation rooms" and other facilities for terrestrial missions. It was recognized in this project that modern mission operations depend heavily upon the collaborative use of computers. It was further recognized that tests have shown that layout of a facility exerts a dramatic effect on the efficiency and endurance of the operations staff. The facility designs (for example, see figure) and the methodology developed during the project reflect this recognition. One element of the methodology is a metric, called effective capacity, that was created for use in evaluating proposed MER operational facilities and may also be useful for evaluating other collaboration spaces, including meeting rooms and military situation rooms. The effective capacity of a facility is defined as the number of people in the facility who can be meaningfully engaged in its operations. A person is considered to be meaningfully engaged if the person can (1) see, hear, and communicate with everyone else present; (2) see the material under discussion (typically data on a piece of paper, computer monitor, or projection screen); and (3) provide input to the product under development by the group. The effective capacity of a facility is less than the number of people that can physically fit in the facility. For example, a typical office that contains a desktop computer has an effective capacity of .4, while a small conference room that contains a projection screen has an effective capacity of around 10. Little or no benefit would be derived from allowing the number of persons in an operational facility to exceed its effective capacity: At best, the operations staff would be underutilized

  9. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  10. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  11. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  12. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  13. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  14. 75 FR 49549 - ABC & D Recycling, Inc.-Lease and Operation Exemption-a Line of Railroad in Ware, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... Surface Transportation Board ABC & D Recycling, Inc.--Lease and Operation Exemption--a Line of Railroad in Ware, MA ABC & D Recycling, Inc. (ABC & D), a noncarrier, has filed a verified notice of exemption... operation of this trackage in FD 35356, ABC & D Recycling, Inc.--Lease and Operation Exemption--a Line...

  15. 75 FR 12594 - Alaska Railroad Corporation-Construction and Operation Exemption-A Rail Line Extension to Port...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... Surface Transportation Board Alaska Railroad Corporation--Construction and Operation Exemption--A Rail... rail service to the Port MacKenzie area, and would include construction of related structures, such as communications towers and sidings. Because construction and operation of this proposed rail line has...

  16. 76 FR 42163 - East Penn Railroad, L.L.C.; Lease and Operation Exemption; Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... Surface Transportation Board East Penn Railroad, L.L.C.; Lease and Operation Exemption; Norfolk Southern... delegated the authority to determine whether to issue notices of exemption for lease transactions under 49 U... has determined that this lease and operation notice of exemption should be issued, and does so...

  17. 76 FR 72752 - Alaska Railroad Corporation-Construction and Operation Exemption-A Rail Line Extension to Port...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... Surface Transportation Board Alaska Railroad Corporation--Construction and Operation Exemption--A Rail... construction and operation exemption. SUMMARY: The Board is granting an exemption under 49 U.S.C. 10502 from... to environmental mitigation conditions and the condition that ARRC build the route designated...

  18. 77 FR 69928 - Transco Railway Products Inc.-Acquisition and Operation Exemption-D&W Railroad LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    ... Surface Transportation Board Transco Railway Products Inc.--Acquisition and Operation Exemption--D&W... exemption under 49 CFR 1150.31 to acquire from D&W Railroad LLC (D&W) and to operate approximately 23 miles...&W main line, which segments include three parallel tracks northeast of the Stub-ended...

  19. Operating Costs of Educational Facilities.

    ERIC Educational Resources Information Center

    Isler, Norman P.

    The references included were drawn from the documents received and processed to date by the ERIC Clearinghouse on Educational Facilities, and are organized into the following sections--(1) school business, (2) maintenance and operations, (3) insurance programs, (4) property accounting, (5) purchasing, and (6) food service. (FS)

  20. Facility design, construction, and operation

    SciTech Connect

    1995-04-01

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l`Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l`Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, including uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec`s contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides` all of the basic information in these areas and reflects actual experience to date.

  1. 77 FR 30588 - R.J. Corman Railroad Company/Pennsylvania Lines Inc.-Construction and Operation Exemption-In...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board R.J. Corman Railroad Company/Pennsylvania Lines Inc.-- Construction and... construction and operation exemption. SUMMARY: The Board grants an exemption under 49 U.S.C. 10502 from...

  2. 77 FR 33560 - Woodland Rail, LLC-Acquisition and Operation Exemption-Line of Maine Central Railroad Co.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... Surface Transportation Board Woodland Rail, LLC--Acquisition and Operation Exemption--Line of Maine Central Railroad Co. Woodland Rail, LLC (Woodland Rail), a noncarrier, has filed a verified notice of..., Canada. As Woodland Rail acknowledges in its notice, the jurisdiction of the Board only extends to...

  3. 77 FR 56266 - CSX Transportation, Inc.-Acquisition of Operating Easement-Grand Trunk Western Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-12

    ...CSX Transportation, Inc. (CSXT) and Grand Trunk Western Railroad Company (GTW) have agreed to exchange perpetual rail operating easements over certain parts of each other's lines. GTW has agreed to grant CSXT an easement over a GTW line between Munster, Ind., and Elsdon, Ill. (Elsdon Line), over which GTW would retain local and overhead trackage rights. CSXT also has agreed to convey local and......

  4. 77 FR 71872 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Tongue River Railroad Company, Inc.--Rail Construction and Operation--in Custer, Powder River and Rosebud Counties, MT; Extension of Comment Period for the Draft Scope of...

  5. 77 FR 66663 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Tongue River Railroad Company, Inc.--Rail Construction and Operation--in Custer, Powder River and Rosebud Counties, MT.; Correction to the Notice of Intent To Prepare...

  6. 77 FR 67863 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Tongue River Railroad Company, Inc.--Rail Construction and Operation--in Custer, Powder River and Rosebud Counties, Montana: Update to the Notice of Intent to Prepare...

  7. 75 FR 74768 - Madison Terminal Railway, LLC-Lease and Operation Exemption-Line of Railroad in Dane County, WI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Madison Terminal Railway, LLC--Lease and Operation Exemption-- Line of Railroad in Dane County, WI Madison Terminal Railway, LLC (MTR), a noncarrier, has filed a verified...

  8. 77 FR 74548 - Michigan Southern Railroad Company-Acquisition and Operation Exemption-RMW Ventures, LLC and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Michigan Southern Railroad Company--Acquisition and Operation Exemption--RMW... pleadings, referring to Docket No. FD 35696, must be filed with the Surface Transportation Board, 395...

  9. 77 FR 49863 - Pacific Imperial Railroad, Inc.-Change in Operator Exemption-Rail Line of San Diego and Arizona...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Pacific Imperial Railroad, Inc.--Change in Operator Exemption-- Rail Line of... original and 10 copies of all pleadings, referring to Docket No. FD 35657, must be filed with the...

  10. 78 FR 60374 - Allentown and Auburn Railroad Company, Inc.-Change in Operators Exemption-Rail Line of Kutztown...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Allentown and Auburn Railroad Company, Inc.--Change in Operators Exemption... filed with the Surface Transportation Board, 395 E Street SW., Washington, DC 20423-0001. In...

  11. PROJECTIZING AN OPERATING NUCLEAR FACILITY

    SciTech Connect

    Adams, N

    2007-07-08

    This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully

  12. 77 FR 12366 - JP Rail, Inc. d/b/a Southern Railroad Company of New Jersey-Operation Exemption-Rail Line in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board JP Rail, Inc. d/b/a Southern Railroad Company of New Jersey-- Operation Exemption--Rail Line in Salem County, N.J. JP Rail, Inc. d/b/a Southern Railroad Company of New Jersey (JP Rail), a Class III rail carrier,...

  13. 75 FR 25310 - Port Harbor Railroad, Inc.-Lease and Operation Exemption-Line of Tri-City Regional Port District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Surface Transportation Board Port Harbor Railroad, Inc.--Lease and Operation Exemption--Line of Tri-City Regional Port District Port Harbor Railroad, Inc. (Port Harbor), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to lease from Tri- City Regional Port District (Tri-City), and...

  14. 75 FR 16005 - Drawbridge Operation Regulation; Port of Coos Bay Railroad Bridge, Coos Bay, North Bend, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ...The Coast Guard is changing the drawbridge operation regulation for the Coos Bay Railroad Bridge, Coos Bay, mile 9.0, at North Bend, Oregon to delete the requirement for special sound signals used in foggy weather and to change the name of the owner. The change is necessary to make the sound signals used at the bridge consistent with other bridges in the area and to eliminate the unnecessary......

  15. National facilities study. Volume 4: Space operations facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The principal objectives of the National Facilities Study (NFS) were to: (1) determine where U.S. facilities do not meet national aerospace needs; (2) define new facilities required to make U.S. capabilities 'world class' where such improvements are in the national interest; (3) define where consolidation and phase-out of existing facilities is appropriate; and (4) develop a long-term national plan for world-class facility acquisition and shared usage. The Space Operations Facilities Task Group defined discrete tasks to accomplish the above objectives within the scope of the study. An assessment of national space operations facilities was conducted to determine the nation's capability to meet the requirements of space operations during the next 30 years. The mission model used in the study to define facility requirements is described in Volume 3. Based on this model, the major focus of the Task Group was to identify any substantive overlap or underutilization of space operations facilities and to identify any facility shortfalls that would necessitate facility upgrades or new facilities. The focus of this initial study was directed toward facility recommendations related to consolidations, closures, enhancements, and upgrades considered necessary to efficiently and effectively support the baseline requirements model. Activities related to identifying facility needs or recommendations for enhancing U.S. international competitiveness and achieving world-class capability, where appropriate, were deferred to a subsequent study phase.

  16. The highway and railroad operating environments for hazardous shipments in the U.S.-safer in the '90s?

    SciTech Connect

    Saricks, C. L.; Tompkins, M. M.

    2000-04-01

    This paper seeks to illuminate the status of transportation safety and risk for large-quantity shipments of spent commercial reactor fuel and mixed and hazardous wastes by examining road and rail accident and vehicular travel data from the mid-1990s. Of special interest are the effect of speed limit changes on controlled-access expressways (chiefly the Interstate Highway System) and the possible effect of season-to-season climatic variation on road transport. We found that improvements in railroad technology and infrastructure have created a safer overall operating environment for railroad freight shipments. We also found recent evidence of an increase in accident rates of heavy combination trucks in states that have raised highway speed limits. Finally, cold weather increases road transport risk, while conditions associated with higher ambient temperatures do not. This last finding is in contrast to rail transport, for which the literature associates both hot and cold temperature extremes with higher accident rates.

  17. Data Management Facility Operations Plan

    SciTech Connect

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  18. Operating procedures: Fusion Experiments Analysis Facility

    SciTech Connect

    Lerche, R.A.; Carey, R.W.

    1984-03-20

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility.

  19. CONNECTICUT RAILROAD

    EPA Science Inventory

    This is a 1:24,000-scale datalayer that includes all of the railroads that appear on the U.S. Geological Survey (USGS) 7½ minute topographic quadrangle maps that cover the State of Connecticut. It includes railroad tracks, sidings, underpasses, stations, etc. Since this datalaye...

  20. Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Drury, Douglas D.

    1978-01-01

    Presents the 1978 literature review of wastewater treatment: (1) operators, training, and certification; (2) solutions to operating problems; (3) collection systems; (4) operations manuals; (5) wastewater treatment facility case histories; (5) land application; and (6) treatment of industrial wastes. A list of 36 references is also presented. (HM)

  1. APPA's New Operational Guidelines for Educational Facilities

    ERIC Educational Resources Information Center

    Bigger, Alan S.

    2011-01-01

    Nearly 25 years ago a group of APPA members and facilities managers started to discuss an idea and to plant a seed about the need for a document, or series of documents, that would explain the need for staffing facilities operations and the implication of such staffing on levels of service. As the demand for increased budget cuts reached seismic…

  2. Railroad deregulation: impact on coal

    SciTech Connect

    Tukenmez, E.

    1983-08-01

    Recent railroad legislation exemplified by the Staggers Rail Act has aimed generally at improving the profitability of the railroads through pricing flexibility and operating changes. The evolution of railroad legislation through the 1970's has indicated a concern about the revenue adequacy of the railroads and the regulatory burden under which the railroads were forced to operate for many years. Over the past two-and-a-half years the railroads generally have been pleased with the results of the Staggers Act. Coal producers and consumers, however, are dissatisfied with the ICC's implementation of the Act. In April 1982, bills were introduced in Congress to clarify provisions of the Staggers Act dealing with market dominance, revenue adequacy, and establishment of coal rate guidelines, in order to protect captive shippers.

  3. 77 FR 18881 - North Louisiana & Arkansas Railroad, Inc.-Lease and Operation Exemption-Line of Southeastern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ...--Line of Southeastern Arkansas Economic Development District North Louisiana & Arkansas Railroad, Inc... from Southeastern Arkansas Economic Development District (SAEDD), a noncarrier political subdivision...

  4. The Cngs Facility:. Performance and Operational Experience

    NASA Astrophysics Data System (ADS)

    Gschwendtner, Edda; Cornelis, Karel; Efthymiopoulos, Ilias; Ferrari, Alfredo; Pardons, Ans; Vincke, Heinz; Wenninger, Joerg; Sala, Paola; Guglielmi, Alberto

    2010-04-01

    The CNGS facility (CERN Neutrinos to Gran Sasso) aims at directly detecting muon to tau neutrino oscillations. An intense muon-neutrino beam (1E17 muon neutrinos/day) is generated at CERN and directed over 732 km towards the Gran Sasso National Laboratory, LNGS, in Italy, where two large and complex detectors, OPERA and ICARUS, are located. CNGS is the first long-baseline neutrino facility in which the measurement of the oscillation parameters is performed by observation of tau-neutrino appearance. In this paper, an overview of the CNGS facility is presented. The experience gained in operating this 500 kW neutrino beam facility is described. Major events since the commissioning of the facility in 2006 are summarized. Highlights on CNGS beam performance since the start of physics run in 2008 are given.

  5. 78 FR 13932 - Yellowstone Valley Railroad, L.L.C.-Discontinuance of Lease and Trackage Rights Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-01

    ... Surface Transportation Board Yellowstone Valley Railroad, L.L.C.--Discontinuance of Lease and Trackage... County, ND On February 11, 2013, Yellowstone Valley Railroad, L.L.C. (YVRR) \\1\\ filed with the Surface...) between: (1) Milepost 43.0, in Crane, Mont., and milepost 78.6, near Snowden, Mont.; and (2) milepost...

  6. Defense Waste Processing Facility -- Radioactive operations -- Part 3 -- Remote operations

    SciTech Connect

    Barnes, W.M.; Kerley, W.D.; Hughes, P.D.

    1997-06-01

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, South Carolina is the nation`s first and world`s largest vitrification facility. Following a ten year construction period and nearly three years of non-radioactive testing, the DWPF began radioactive operations in March 1996. Radioactive glass is poured from the joule heated melter into the stainless steel canisters. The canisters are then temporarily sealed, decontaminated, resistance welded for final closure, and transported to an interim storage facility. All of these operations are conducted remotely with equipment specially designed for these processes. This paper reviews canister processing during the first nine months of radioactive operations at DWPF. The fundamental design consideration for DWPF remote canister processing and handling equipment are discussed as well as interim canister storage.

  7. Defense waste processing facility radioactive operations. Part 1 - operating experience

    SciTech Connect

    Little, D.B.; Gee, J.T.; Barnes, W.M.

    1997-12-31

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation`s first and the world`s largest vitrification facility. Following a ten year construction program and a 3 year non-radioactive test program, DWPF began radioactive operations in March 1996. This paper presents the results of the first 9 months of radioactive operations. Topics include: operations of the remote processing equipment reliability, and decontamination facilities for the remote processing equipment. Key equipment discussed includes process pumps, telerobotic manipulators, infrared camera, Holledge{trademark} level gauges and in-cell (remote) cranes. Information is presented regarding equipment at the conclusion of the DWPF test program it also discussed, with special emphasis on agitator blades and cooling/heating coil wear. 3 refs., 4 figs.

  8. 78 FR 69746 - Buckeye Railroad Holdings, LLC-Continuance in Control-Buckeye Hammond Railroad, LLC, and Buckeye...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... Railroad, LLC, and Buckeye East Chicago Railroad, LLC Buckeye Railroad Holdings, LLC (BRH), has filed a..., LLC (BHRR), and Buckeye East Chicago Railroad, LLC (BECRR), both Class III rail carriers. In November... right-of-way, and bulk liquid transloading facilities in East Chicago, Ind. Buckeye E. Chi....

  9. Operating large controlled thermonuclear fusion research facilities

    SciTech Connect

    Gaudreau, M.P.J.; Tarrh, J.M.; Post, R.S.; Thomas, P.

    1987-10-01

    The MIT Tara Tandem Mirror is a large, state of the art controlled thermonuclear fusion research facility. Over the six years of its design, implementation, and operation, every effort was made to minimize cost and maximize performance by using the best and latest hardware, software, and scientific and operational techniques. After reviewing all major DOE fusion facilities, an independent DOE review committee concluded that the Tara operation was the most automated and efficient of all DOE facilities. This paper includes a review of the key elements of the Tara design, construction, operation, management, physics milestones, and funding that led to this success. We emphasize a chronological description of how the system evolved from the proposal stage to a mature device with an emphasis on the basic philosophies behind the implementation process. This description can serve both as a qualitative and quantitative database for future large experiment planning. It includes actual final costs and manpower spent as well as actual run and maintenance schedules, number of data shots, major system failures, etc. The paper concludes with recommendations for the next generation of facilities. 13 refs., 15 figs., 3 tabs.

  10. Recent operational experiments at the LANSCE facility

    SciTech Connect

    Rybarcyk, Lawrence J

    2010-09-15

    The Los Alamos Neutron Science Center (LANSCE) consists of a pulsed 800-MeV room-temperature linear accelerator and an 800-MeV accumulator ring. It simultaneously provides H{sup +} and H{sup -} beams to several user facilities that have their own distinctive requirements, e.g. intensity, chopping pattern, duty factor, etc.. This multibeam operation presents challenges both from the standpoint of meeting the individual requirements but also achieving good overall performance for the integrated operation. Various aspects of more recent operations including the some of these challenges will be discussed.

  11. 75 FR 1447 - Alaska Railroad Corporation-Construction and Operation Exemption-Rail Line Between North Pole and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... Between North Pole and Delta Junction, AK By petition filed on July 6, 2007, Alaska Railroad Corporation... side of the community of Delta Junction. In a decision served on October 4, 2007, the Board...

  12. 77 FR 74548 - North Shore Railroad Company-Acquisition and Operation Exemption-PPL Susquehanna, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... decision, North Shore stated that it provided common carrier rail service on the Line. In any event, North Shore will not become an authorized common carrier with respect to the Line until the effective date of... subsidiary of PPL Generation, LLC, is the operator of the power plant served by the Line and owns a...

  13. 75 FR 24400 - Drawbridge Operation Regulation; CSX Railroad, Trout River, Mile 0.9, Jacksonville, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ..., Jacksonville, FL in the Federal Register (74 FR 106). We received no comments on the proposed rule. No public..., mile 0.9, Jacksonville, Florida. This rule will allow the bridge to operate using an automated system...@uscg.mil , Seventh Coast Guard District, Bridge Branch, 909 S.E. 1st Ave., Miami, FL 33131,...

  14. Government and the midwest railroads: notes on the demise of the Chicago, Rock Island and Pacific Railroad Company

    SciTech Connect

    Ingram, J.W.

    1980-01-01

    The Chicago, Rock Island and Pacific Railroad Co. declared bankruptcy in 1975. Reorganization efforts after entering bankruptcy are reported. The company sought federal and private funds and revamped its operating procedures to reduce the capital intensiveness of railroad activities. Railroad labor unions balked at the company's new policy to reduce personnel in order to operate a light-density railroad. Strikes created more cash flow problems, and the federal government directed another railroad company to take over operations of the line. Such federal favoring of unions over railroads poses a bleak future for the future maintenance of individual railroad companies.

  15. Sulphite Railroad Bridge1896, Title Sheet Sulphite Railroad Bridge, Former ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Sulphite Railroad Bridge-1896, Title Sheet - Sulphite Railroad Bridge, Former Boston & Maine Railroad (originally Tilton & Franklin Railroad) spanning Winnipesautee River, Franklin, Merrimack County, NH

  16. 75 FR 54543 - Changes to NARA Facilities' Hours of Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... of Operation AGENCY: National Archives and Records Administration. ACTION: Proposed rule. SUMMARY... provide NARA facilities' hours of operation. The proposed regulations will remove NARA facilities' hours of operation from the Code of Federal Regulations (CFR) and establish procedures that NARA...

  17. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  18. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  19. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  20. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  1. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  2. 75 FR 47678 - Northern Plains Railroad, Inc.-Lease Exemption-Soo Line Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... Surface Transportation Board Northern Plains Railroad, Inc.--Lease Exemption--Soo Line Railroad Company... authority to determine whether to issue notices of exemption for lease transactions under 49 U.S.C. 10902... notice of lease and operation exemption should be issued, and does so here. Northern Plains Railroad,...

  3. Integrated safeguards and facility design and operations

    SciTech Connect

    Tape, J.W.; Coulter, C.A.; Markin, J.T.; Thomas, K.E.

    1987-01-01

    The integration of safeguards functions to deter or detect unauthorized actions by insiders requires careful communication and management of safeguards-relevant information on a timely basis. The separation of safeguards functions into physical protection, materials control, and materials accounting often inhibits important information flows. Redefining the major safeguards functions as authorization, enforcement, and verification and careful attention to management of information can result in effective safeguards integration. Whether designing new systems or analyzing existing ones, understanding the interface between facility operations and safeguards is critical to cost-effective integrated safeguards systems that meet modern standards of performance.

  4. 75 FR 68399 - Lancaster & Chester Railroad, LLC-Acquisition and Operation Exemption-Line of Lancaster & Chester...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... served and published in the Federal Register on Friday, October 15, 2010 (75 FR 63,532-33). In the notice... Station 0+06 (milepost SG-346+2210) in Chester County, S.C. Instead, L&C Railroad will connect with...

  5. 76 FR 22749 - Camden & Southern Railroad, Inc.-Lease and Operation Exemption-Camden Area Industrial Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... & Russellville R.R., Ouachita R.R., & Camden & S. R.R., 76 FR 21797-98 (Apr. 18, 2011). The transaction is... Industrial Development Corporation Camden & Southern Railroad, Inc. (C&S), a noncarrier, has filed a verified... Area Industrial Development Corporation (CAIDC), located at Zone JH482, Yard 06, opposite milepost...

  6. 75 FR 68397 - DeQueen and Eastern Railroad, LLC-Acquisition and Operation Exemption-DeQueen and Eastern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... border) and milepost 87.0 (Perkins, Ark.), including auxiliary, temporary storage, and spur tracks, in Howard and Sevier Counties, Ark.\\1\\ \\1\\ DQE states that it intends to interchange traffic at De Queen, Ark. with Kansas City Southern Railway Company, at Perkins with Union Pacific Railroad Company, and...

  7. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    SciTech Connect

    BENECKE, M.W.

    2000-09-06

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility.

  8. Facility Will Help Transition Models Into Operations

    NASA Astrophysics Data System (ADS)

    Kumar, Mohi

    2009-02-01

    The U.S. National Oceanic and Atmospheric Administration's Space Weather Prediction Center (NOAA SWPC), in partnership with the U.S. Air Force Weather Agency (AFWA), is establishing a center to promote and facilitate the transition of space weather models to operations. The new facility, called the Developmental Testbed Center (DTC), will take models used by researchers and rigorously test them to see if they can withstand continued use as viable warning systems. If a model used in a space weather warning system crashes or fails to perform well, severe consequences can result. These include increased radiation risks to astronauts and people traveling on high-altitude flights, national security vulnerabilities from the loss of military satellite communications, and the cost of replacing damaged military and commercial spacecraft.

  9. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  10. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  11. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  12. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  13. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  14. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Design and operation of facility. 264... Preparedness and Prevention § 264.31 Design and operation of facility. Facilities must be designed, constructed... could threaten human health or the environment....

  15. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Design and operation of facility. 264... Preparedness and Prevention § 264.31 Design and operation of facility. Facilities must be designed, constructed... could threaten human health or the environment....

  16. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Design and operation of facility. 264... Preparedness and Prevention § 264.31 Design and operation of facility. Facilities must be designed, constructed... could threaten human health or the environment....

  17. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Design and operation of facility. 264... Preparedness and Prevention § 264.31 Design and operation of facility. Facilities must be designed, constructed... could threaten human health or the environment....

  18. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Design and operation of facility. 264... Preparedness and Prevention § 264.31 Design and operation of facility. Facilities must be designed, constructed... could threaten human health or the environment....

  19. High level waste facilities -- Continuing operation or orderly shutdown

    SciTech Connect

    Decker, L.A.

    1998-04-01

    Two options for Environmental Impact Statement No action alternatives describe operation of the radioactive liquid waste facilities at the Idaho Chemical Processing Plant at the Idaho National Engineering and Environmental Laboratory. The first alternative describes continued operation of all facilities as planned and budgeted through 2020. Institutional control for 100 years would follow shutdown of operational facilities. Alternatively, the facilities would be shut down in an orderly fashion without completing planned activities. The facilities and associated operations are described. Remaining sodium bearing liquid waste will be converted to solid calcine in the New Waste Calcining Facility (NWCF) or will be left in the waste tanks. The calcine solids will be stored in the existing Calcine Solids Storage Facilities (CSSF). Regulatory and cost impacts are discussed.

  20. Shoreham Railroad Bridge, Title Sheet Shoreham Railroad Bridge, Former ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Shoreham Railroad Bridge, Title Sheet - Shoreham Railroad Bridge, Former Addison County Railroad (later, Rutland Railroad, Addison Branch), spanning Lemon Fair River above Richville Pond, west of East Shoreham Road, Shoreham, Addison County, VT

  1. 76 FR 4276 - Hazardous Materials: Improving the Safety of Railroad Transportation of Hazardous Materials

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Transportation of Hazardous Materials AGENCY: Federal Railroad Administration (FRA), Department of Transportation... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION... comments. Fax: 202-493-2251. Mail: Docket Operations Facility, U.S. Department of Transportation, 1200...

  2. Operational Safety Requirements Neutron Multiplier Facility in 329 Building

    SciTech Connect

    EA. Lepel

    1992-10-01

    The operational safety requirements (OSRs) presented in this report define the conditions, safe boundaries and management control needed for safely operating the Neutron Multiplier Facility in the 329 Building Annex.

  3. Railroad electrification in America's future: an assessment of prospects and impacts. Final report

    SciTech Connect

    White, R.K.; Yabroff, I.W.; Dickson, E.M.; Zink, R.A.; Gray, M.E.; Moon, A.E.

    1980-01-01

    Such considerations as the level of traffic, the relative financial health of individual railroads, the capacity of the associated supply and engineering/construction industries, and the logical connecting points at classifying yards, as well as the national interest value of creating a continuous system, continental in scope, were used to construct a scenario for railroad electrification that closely approximates how an electrification program might be implemented. For the economic reasons cited, much of the US railroad system would remain conventionally powered. This scenario provides for an electrified network involving 14 mainlines operated by 10 companies that could transport much of the nation's rail-borne freight. Five years of planning and engineering work would be required for each link before construction could begin. With 1000 miles or less of electrified route per year, 14 years would be needed to construct the 9000-mile network of our scenario. (The scenario constructed runs from 1980 to 1998.) The analysis was aided with the construction of the SRI Railroad Industry Model. Basically a model of industry operations and finances, the model produces income statements and balance sheets at yearly intervals. Railroad energy costs, railroad freight levels, maintenance costs, purchases and leases of rooling stock, electrification facility investments, future inflation, rate setting practices, annual depreciation, taxes, and profits were calculated.

  4. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Maintenance and operation of facility..., STORAGE, AND DISPOSAL FACILITIES Preparedness and Prevention § 265.31 Maintenance and operation of..., soil, or surface water which could threaten human health or the -environment....

  5. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Maintenance and operation of facility..., STORAGE, AND DISPOSAL FACILITIES Preparedness and Prevention § 265.31 Maintenance and operation of..., soil, or surface water which could threaten human health or the -environment....

  6. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Maintenance and operation of facility..., STORAGE, AND DISPOSAL FACILITIES Preparedness and Prevention § 265.31 Maintenance and operation of..., soil, or surface water which could threaten human health or the -environment....

  7. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Maintenance and operation of facility..., STORAGE, AND DISPOSAL FACILITIES Preparedness and Prevention § 265.31 Maintenance and operation of..., soil, or surface water which could threaten human health or the -environment....

  8. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Maintenance and operation of facility..., STORAGE, AND DISPOSAL FACILITIES Preparedness and Prevention § 265.31 Maintenance and operation of..., soil, or surface water which could threaten human health or the -environment....

  9. A study of the operation of selected national research facilities

    NASA Technical Reports Server (NTRS)

    Eisner, M.

    1974-01-01

    The operation of national research facilities was studied. Conclusions of the study show that a strong resident scientific staff is required for successful facility operation. No unique scheme of scientific management is revealed except for the obvious fact that the management must be responsive to the users needs and requirements. Users groups provide a convenient channel through which these needs and requirements are communicated.

  10. 49 CFR 1.88 - The Federal Railroad Administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false The Federal Railroad Administration. 1.88 Section... AND DUTIES Operating Administrations § 1.88 The Federal Railroad Administration. Is responsible for: (a) Regulating safety functions pertaining to railroads; (b) Conducting research and...

  11. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  12. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  13. 49 CFR 1.88 - The Federal Railroad Administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false The Federal Railroad Administration. 1.88 Section... AND DUTIES Operating Administrations § 1.88 The Federal Railroad Administration. Is responsible for: (a) Regulating safety functions pertaining to railroads; (b) Conducting research and...

  14. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  15. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  16. 49 CFR 1.88 - The Federal Railroad Administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false The Federal Railroad Administration. 1.88 Section... AND DUTIES Operating Administrations § 1.88 The Federal Railroad Administration. Is responsible for: (a) Regulating safety functions pertaining to railroads; (b) Conducting research and...

  17. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  18. 14 CFR 121.122 - Communications facilities-supplemental operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communications facilities-supplemental operations. 121.122 Section 121.122 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC,...

  19. National Ignition Facility (NIF) operations procedures plan

    SciTech Connect

    Mantrom, D.

    1998-05-06

    The purpose of this Operations Procedures Plan is to establish a standard procedure which outlines how NIF Operations procedures will be developed (i.e , written, edited, reviewed, approved, published, revised) and accessed by the NIF Operations staff who must use procedures in order to accomplish their tasks. In addition, this Plan is designed to provide a guide to the NIF Project staff to assist them in planning and writing procedures. Also, resource and scheduling information is provided.

  20. School Facilities Maintenance and Operations Manual.

    ERIC Educational Resources Information Center

    Association of School Business Officials International, Reston, VA.

    Often a community's largest single investment is in its physical plants, including public school buildings and grounds. An essential factor in efficient school district operation is a well-organized, responsive plant operations and maintenance division. Maintenance has generally been defined as those services, activities, and procedures concerned…

  1. Developing operational safety requirements for non-nuclear facilities

    SciTech Connect

    Mahn, J.A.

    1997-11-01

    Little guidance has been provided by the DOE for developing appropriate Operational Safety Requirements (OSR) for non-nuclear facility safety documents. For a period of time, Chapter 2 of DOE/AL Supplemental Order 5481.lB provided format guidance for non-reactor nuclear facility OSRs when this supplemental order applied to both nuclear and non-nuclear facilities. Thus, DOE Albuquerque Operations Office personnel still want to see non-nuclear facility OSRs in accordance with the supplemental order (i.e., in terms of Safety Limits, Limiting Conditions for Operation, and Administrative Controls). Furthermore, they want to see a clear correlation between the OSRs and the results of a facility safety analysis. This paper demonstrates how OSRs can be rather simply derived from the results of a risk assessment performed using the ``binning`` methodology of SAND95-0320.

  2. Lunar landing and launch facilities and operations

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A preliminary design of a lunar landing and launch facility for a Phase 3 lunar base is formulated. A single multipurpose vehicle for the lunar module is assumed. Three traffic levels are envisioned: 6, 12, and 24 landings/launches per year. The facility is broken down into nine major design items. A conceptual description of each of these items is included. Preliminary sizes, capacities, and/or other relevant design data for some of these items are obtained. A quonset hut tent-like structure constructed of aluminum rods and aluminized mylar panels is proposed. This structure is used to provide a constant thermal environment for the lunar modules. A structural design and thermal analysis is presented. Two independent designs for a bridge crane to unload/load heavy cargo from the lunar module are included. Preliminary investigations into cryogenic propellant storage and handling, landing/launch guidance and control, and lunar module maintenance requirements are performed. Also, an initial study into advanced concepts for application to Phase 4 or 5 lunar bases has been completed in a report on capturing, condensing, and recycling the exhaust plume from a lunar launch.

  3. Fuel supply shutdown facility interim operational safety requirements

    SciTech Connect

    Besser, R.L.; Brehm, J.R.; Benecke, M.W.; Remaize, J.A.

    1995-05-23

    These Interim Operational Safety Requirements (IOSR) for the Fuel Supply Shutdown (FSS) facility define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls to ensure safe operation. The IOSRs apply to the fuel material storage buildings in various modes (operation, storage, surveillance).

  4. An overview of the Railroad Retirement program.

    PubMed

    Whitman, Kevin

    2008-01-01

    In the 1930s, amidst concern about the ability of existing pension programs to provide former railroad workers with adequate assistance in old age, Congress established a national Railroad Retirement system. This system is primarily administered by the Railroad Retirement Board (RRB), which is an independent federal agency charged with providing benefits to eligible employees of the railroad industry and their families. Today, the Railroad Retirement program is closely tied to the far better-known Social Security program, and although the Railroad Retirement program and Social Security share a number of common elements, key differences also exist between the two in areas such as funding and benefit structure. This article aims to increase awareness and understanding of the Railroad Retirement program and its relationship with Social Security by examining the parallel development of these two retirement programs while illuminating areas where the two diverge. The history of the Railroad Retirement program, the benefits provided by the program, and RRB's financial operations are reviewed, using elements of the Social Security system as points of reference. PMID:19102137

  5. Design and operations at the National Tritium Labelling Facility

    SciTech Connect

    Morimoto, H.; Williams, P.G.

    1991-09-01

    The National Tritium Labelling Facility (NTLF) is a multipurpose facility engaged in tritium labeling research. It offers to the biomedical research community a fully equipped laboratory for the synthesis and analysis of tritium labeled compounds. The design of the tritiation system, its operations and some labeling techniques are presented.

  6. 33 CFR 158.163 - Reception facility operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... required to have an Operations Manual under this chapter or 46 CFR Chapter 1 must have a copy of the... (CONTINUED) POLLUTION RECEPTION FACILITIES FOR OIL, NOXIOUS LIQUID SUBSTANCES, AND GARBAGE General §...

  7. 33 CFR 158.163 - Reception facility operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... required to have an Operations Manual under this chapter or 46 CFR Chapter 1 must have a copy of the... (CONTINUED) POLLUTION RECEPTION FACILITIES FOR OIL, NOXIOUS LIQUID SUBSTANCES, AND GARBAGE General §...

  8. Operational summary of an electric propulsion long term test facility

    NASA Technical Reports Server (NTRS)

    Trump, G. E.; James, E. L.; Bechtel, R. T.

    1982-01-01

    An automated test facility capable of simultaneously operating three 2.5 kW, 30-cm mercury ion thrusters and their power processors is described, along with a test program conducted for the documentation of thruster characteristics as a function of time. Facility controls are analog, with full redundancy, so that in the event of malfunction the facility automaticcally activates a backup mode and notifies an operator. Test data are recorded by a central data collection system and processed as daily averages. The facility has operated continuously for a period of 37 months, over which nine mercury ion thrusters and four power processor units accumulated a total of over 14,500 hours of thruster operating time.

  9. Spent nuclear fuel project cold vacuum drying facility operations manual

    SciTech Connect

    IRWIN, J.J.

    1999-05-12

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  10. 33 CFR 158.163 - Reception facility operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... required to have an Operations Manual under this chapter or 46 CFR Chapter 1 must have a copy of the... (CONTINUED) POLLUTION RECEPTION FACILITIES FOR OIL, NOXIOUS LIQUID SUBSTANCES, AND GARBAGE General §...

  11. 33 CFR 158.163 - Reception facility operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... required to have an Operations Manual under this chapter or 46 CFR Chapter 1 must have a copy of the... (CONTINUED) POLLUTION RECEPTION FACILITIES FOR OIL, NOXIOUS LIQUID SUBSTANCES, AND GARBAGE General §...

  12. 33 CFR 158.163 - Reception facility operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... required to have an Operations Manual under this chapter or 46 CFR Chapter 1 must have a copy of the... (CONTINUED) POLLUTION RECEPTION FACILITIES FOR OIL, NOXIOUS LIQUID SUBSTANCES, AND GARBAGE General §...

  13. All purpose railroad car

    SciTech Connect

    Terlecky, B.S.

    1987-01-13

    An all purpose railroad car is described for transporting wheeled trailers and containers, the car comprising an elongated frame supported by wheel trucks, combined hitch and bolster means adjacent one end of the frame for selectively receiving and releasably retaining a trailer king pin and one end of a container. A means is spaced from the combined hitch and bolster means for selectively receiving and supporting the wheels of a wheeled trailer and the other end of a container. The combined hitch and bolster means is an integral rigid structure with the hitch fixed in spaced relationship to the bolster with both the hitch and the bolster permanently disposed in operative position to respectively receive and retain a trailer king pin and a container.

  14. 76 FR 1666 - Susquehanna Union Railroad Company-Control Exemption-North Shore Railroad Company, Nittany & Bald...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Company, Nittany & Bald Eagle Railroad Company, Shamokin Valley Railroad Company, Juniata Valley Railroad... Class III railroads: North Shore Railroad Company, Nittany & Bald Eagle Railroad Company,...

  15. 77 FR 64592 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ...--in Custer, Powder River and Rosebud Counties, MT AGENCY: Surface Transportation Board, DOT. ACTION.... \\1\\ Tongue River R.R.--Rail Construction and Operation--In Custer, Powder River and Rosebud Cntys...\\ Tongue River R.R.--Rail Constr. & Operation--In Custer, Powder River & Rosebud Cntys., Mont., FD 30186...

  16. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  17. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  18. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  19. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  20. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  1. Railroad and locomotive technology roadmap.

    SciTech Connect

    Stodolsky, F.; Gaines, L.; Energy Systems

    2003-02-24

    Railroads are important to the U.S. economy. They transport freight efficiently, requiring less energy and emitting fewer pollutants than other modes of surface transportation. While the railroad industry has steadily improved its fuel efficiency--by 16% over the last decade--more can, and needs to, be done. The ability of locomotive manufacturers to conduct research into fuel efficiency and emissions reduction is limited by the small number of locomotives manufactured annually. Each year for the last five years, the two North American locomotive manufacturers--General Electric Transportation Systems and the Electro-Motive Division of General Motors--have together sold about 800 locomotives in the United States. With such a small number of units over which research costs can be spread, outside help is needed to investigate all possible ways to reduce fuel usage and emissions. Because fuel costs represent a significant portion of the total operating costs of a railroad, fuel efficiency has always been an important factor in the design of locomotives and in the operations of a railroad. However, fuel efficiency has recently become even more critical with the introduction of strict emission standards by the U.S. Environmental Protection Agency, to be implemented in stages (Tiers 0, 1, and 2) between 2000 and 2005. Some of the technologies that could be employed to meet the emission standards may negatively affect fuel economy--by as much as 10-15% when emissions are reduced to Tier 1 levels. Lowering fuel economy by that magnitude would have a serious impact on the cost to the consumer of goods shipped by rail, on the competitiveness of the railroad industry, and on this country's dependence on foreign oil. Clearly, a joint government/industry R&D program is needed to help catalyze the development of advanced technologies that will substantially reduce locomotive engine emissions while also improving train system energy efficiency. DOE convened an industry

  2. Recent Enhancements to the National Transonic Facility (Mixed Mode Operations)

    NASA Technical Reports Server (NTRS)

    Kilgore, W. Allen; Chan, David; Balakrishna, S.; Wahls, Richard A.

    2006-01-01

    The U.S. National Transonic Facility continues to make enhancements to provide quality data in a safe, efficient and cost effective method for aerodynamic ground testing. Recent enhancements discussed in this paper include the development of a Mixed-mode of operations that combine Air-mode operations with Nitrogen-mode operations. This implementation and operational results of this new Mixed-mode expands the ambient temperature transonic region of testing beyond the Air-mode limitations at a significantly reduced cost over Nitrogen Mode operation.

  3. Description and Operation of the A3 Subscale Facility

    NASA Technical Reports Server (NTRS)

    Saunders, G. P.; Varner, D. G.; Grover, J. B.

    2010-01-01

    The purpose of this paper is to give an overview of the general design and operation of the A3 Subscale test facility. The goal is to provide the reader with a general understanding of what the major facility systems are, where they are located, and how they are used to meet the objectives supporting the design of the A3 altitude rocket test facility. This paper also provides the reader with the background information prior to reading the subsequent papers detailing the design and test results of the various systems described herein.

  4. Assuring operational readiness of the National Ignition Facility.

    PubMed

    Brereton, Sandra J; Papp, Frank

    2013-06-01

    National Ignition Facility experiments involve the use of a variety of materials that generate a number of radiological issues. Along with the use of tritium and depleted uranium, shots generating neutrons create prompt radiation fields as well as fission and activation products. In order to assure readiness for these hazards, a series of readiness reviews was conducted as the hazards were introduced. Each step was built upon the previous steps, as well as the basic infrastructure and operating capability of the laser facility. A detailed preparation plan for the introduction of these hazards was developed. This included ensuring required equipment was in place and ready, all plans and procedures were developed, and personnel were trained and qualified to perform work in the environment. The approach for preparing the facility for operations under the new set of conditions, the preparations for the readiness reviews, the review process, as well as the approach to initial operations are discussed. PMID:23629065

  5. 78 FR 1936 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-In Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-09

    ... Custer, Powder River and Rosebud Counties, MT AGENCY: Surface Transportation Board. ACTION: Notice of... Custer, Powder River and Rosebud Cntys., Mont. (Tongue River I), FD 30186 (ICC served Sept. 4, 1985... III. \\4\\ See Tongue River R.R.--Rail Constr. and Operation--In Custer, Powder River and Rosebud...

  6. Johnson County Community College and Burlington Northern Railroad.

    ERIC Educational Resources Information Center

    Radakovich, Dan; Lindsay, Susan; Osborn, Bill

    In order to serve the educational needs of the business community and generate revenues, Johnson County Community College (Kansas) formed a partnership with Burlington Northern Railroad in which the railroad's training facility would be relocated on the college's campus. This report documents the development of that relationship, its purpose, and…

  7. KSC facilities status and planned management operations. [for Shuttle launches

    NASA Technical Reports Server (NTRS)

    Gray, R. H.; Omalley, T. J.

    1979-01-01

    A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.

  8. APET methodology for Defense Waste Processing Facility: Mode C operation

    SciTech Connect

    Taylor, R.P. Jr.; Massey, W.M.

    1995-04-01

    Safe operation of SRS facilities continues to be the highest priority of the Savannah River Site (SRS). One of these facilities, the Defense Waste Processing Facility or DWPF, is currently undergoing cold chemical runs to verify the design and construction preparatory to hot startup in 1995. The DWPFF is a facility designed to convert the waste currently stored in tanks at the 200-Area tank farm into a form that is suitable for long term storage in engineered surface facilities and, ultimately, geologic isolation. As a part of the program to ensure safe operation of the DWPF, a probabilistic Safety Assessment of the DWPF has been completed. The results of this analysis are incorporated into the Safety Analysis Report (SAR) for DWPF. The usual practice in preparation of Safety Analysis Reports is to include only a conservative analysis of certain design basis accidents. A major part of a Probabilistic Safety Assessment is the development and quantification of an Accident Progression Event Tree or APET. The APET provides a probabilistic representation of potential sequences along which an accident may progress. The methodology used to determine the risk of operation of the DWPF borrows heavily from methods applied to the Probabilistic Safety Assessment of SRS reactors and to some commercial reactors. This report describes the Accident Progression Event Tree developed for the Probabilistic Safety Assessment of the DWPF.

  9. Man-Vehicle Systems Research Facility - Design and operating characteristics

    NASA Technical Reports Server (NTRS)

    Shiner, Robert J.; Sullivan, Barry T.

    1992-01-01

    This paper describes the full-mission flight simulation facility at the NASA Ames Research Center. The Man-Vehicle Systems Research Facility (MVSRF) supports aeronautical human factors research and consists of two full-mission flight simulators and an air-traffic-control simulator. The facility is used for a broad range of human factors research in both conventional and advanced aviation systems. The objectives of the research are to improve the understanding of the causes and effects of human errors in aviation operations, and to limit their occurrence. The facility is used to: (1) develop fundamental analytical expressions of the functional performance characteristics of aircraft flight crews; (2) formulate principles and design criteria for aviation environments; (3) evaluate the integration of subsystems in contemporary flight and air traffic control scenarios; and (4) develop training and simulation technologies.

  10. ARM Operations and Engineering Procedure Mobile Facility Site Startup

    SciTech Connect

    Voyles, Jimmy W

    2015-05-01

    This procedure exists to define the key milestones, necessary steps, and process rules required to commission and operate an Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF), with a specific focus toward on-time product delivery to the ARM Data Archive. The overall objective is to have the physical infrastructure, networking and communications, and instrument calibration, grooming, and alignment (CG&A) completed with data products available from the ARM Data Archive by the Operational Start Date milestone.

  11. Waste Encapsulation and Storage Facility interim operational safety requirements

    SciTech Connect

    COVEY, L.I.

    2000-11-28

    The Interim Operational Safety Requirements (IOSRs) for the Waste Encapsulation and Storage Facility (WESF) define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation during receipt and inspection of cesium and strontium capsules from private irradiators; decontamination of the capsules and equipment; surveillance of the stored capsules; and maintenance activities. Controls required for public safety, significant defense-in-depth, significant worker safety, and for maintaining radiological consequences below risk evaluation guidelines (EGs) are included.

  12. Evaluating Operational Irregularities at Hanford's Environmental Restoration Disposal Facility

    SciTech Connect

    Benson, C.H.; Albright, W.H.; Ray, D.P.; Smegal, J.S.; Robertson, Jr.O.C.; Gupta, D.C.

    2008-07-01

    This paper describes the findings of an independent technical review that investigated operational irregularities at the Environmental Restoration Disposal Facility (ERDF) at Hanford. The ERDF is a large-scale disposal facility authorized by the Environmental Protection Agency and the Washington State Department of Ecology to receive waste from Hanford cleanup activities. The irregularities included (i) failure to recognize that pumps for the leachate collection system were not functioning for an extended period and (ii) falsification of compaction data by a technician responsible for monitoring waste placement in the ERDF. Other issues related to compaction of the waste were also considered during the independent technical review. A number of important lessons were learned as part of this review. These lessons are summarized in the paper. They are relevant to the ERDF as well as other landfill operations at Department of Energy facilities. (authors)

  13. The Defense Waste Processing Facility: Two Years of Radioactive Operation

    SciTech Connect

    Marra, S.L.; Gee, J.T.; Sproull, J.F.

    1998-05-01

    The Defense Waste Processing Facility (DWPF) at the Savannah River Site in Aiken, SC is currently immobilizing high level radioactive sludge waste in borosilicate glass. The DWPF began vitrification of radioactive waste in May, 1996. Prior to that time, an extensive startup test program was completed with simulated waste. The DWPF is a first of its kind facility. The experience gained and data collected during the startup program and early years of operation can provide valuable information to other similar facilities. This experience involves many areas such as process enhancements, analytical improvements, glass pouring issues, and documentation/data collection and tracking. A summary of this experience and the results of the first two years of operation will be presented.

  14. Federal Guidelines - Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document contains the federal guidelines for meeting the specific requirements of the Federal Water Pollution Control Act Amendments of 1972. These guidelines are also intended to assist in meeting the regulations for grant assisted facility construction and to provide information on the key elements to be included in the operation plans for…

  15. Space Station Freedom technology payload user operations facility concept

    NASA Technical Reports Server (NTRS)

    Henning, Gary N.; Avery, Don E.

    1992-01-01

    This report presents a concept for a User Operations Facility (UOF) for payloads sponsored by the NASA Office of Aeronautics and Space Technology (OAST). The UOF can be located at any OAST sponsored center; however, for planning purposes, it is assumed that the center will be located at Langley Research Center (LaRC).

  16. Moonport: A History of Apollo Launch Facilities and Operations

    NASA Technical Reports Server (NTRS)

    Benson, C. D.; Faherty, W. B.

    1978-01-01

    The development of the Apollo f launch facilities and launch operations is described from the beginning of design through the final launch. Management techniques, innovation in automation, and testing on the ground to avoid failures in space are among the topics covered. The impact of the Apollo program on the citrus groves and quiet beaches of Florida's east coast is included.

  17. Space facilities: Meeting future needs for research, development, and operations

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The National Facilities Study (NFS) represents an interagency effort to develop a comprehensive and integrated long-term plan for world-class aeronautical and space facilities that meet current and projected needs for commercial and government aerospace research and development and space operations. At the request of NASA and the DOD, the National Research Council's Committee on Space Facilities has reviewed the space related findings of the NFS. The inventory of more than 2800 facilities will be an important resource, especially if it continues to be updated and maintained as the NFS report recommends. The data in the inventory provide the basis for a much better understanding of the resources available in the national facilities infrastructure, as well as extensive information on which to base rational decisions about current and future facilities needs. The working groups have used the inventory data and other information to make a set of recommendations that include estimates of cast savings and steps for implementation. While it is natural that the NFS focused on cost reduction and consolidations, such a study is most useful to future planning if it gives equal weight to guiding the direction of future facilities needed to satisfy legitimate national aspirations. Even in the context of cost reduction through facilities closures and consolidations, the study is timid about recognizing and proposing program changes and realignments of roles and missions to capture what could be significant savings and increased effectiveness. The recommendations of the Committee on Space Facilities are driven by the clear need to be more realistic and precise both in recognizing current incentives and disincentives in the aerospace industry and in forecasting future conditions for U.S. space activities.

  18. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1996 Annual Report.

    SciTech Connect

    Rowan, Gerald D.

    1997-06-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinook and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996.

  19. Railroad routing and costing. Final report

    SciTech Connect

    Bronzini, M.S.; Sherman, D.M.

    1986-08-01

    This research has the objective of providing reliable tools for forecasting the costs of transporting coal from the coal supply regions to the coal demand regions of the United States. The present work was devoted primarily to improving and updating the Railroad Routing Model (RRM) and related data base developed earlier. The railroad network data were modified to incorporate the extensive structural changes which occurred during the period 1980 to 1982. All of the rail time, energy, and cost functions were completely reestimated, taking advantage of improved railrod operations and cost simulators and recent research on railroad costs. After a review of the latest research on railroad routing in large networks, the RRM was refined and tailored to the problem of finding likely routes and estimating fully allocated carrier costs for coal shipments. A new RRM routing algorithm finds routes which satisfy the dual railroad objectives of maximizing the carrier's share of total shipment revenue and minimizing cost. Five utilities tested and demonstrated the new RRM and data base in a series of case studies. These utilities provided data on 38 coal moves with haul distances of 200 to 1700 miles, including a mixture of both existing and prospective movements. The RRM was found to produce credible results. Full and effective use of these improved tools for railroad routing and costing has been facilitated through additional work to develop an interactive system with improved data base management capabilities and expanded cost estimating features.

  20. 30. West view, showing court in storehouse #1 adn railroad ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. West view, showing court in storehouse #1 adn railroad facilities connecting with yards and float bridges at thirty-eighth street. - U.S. Navy Fleet Supply Base, Storehouse No. 1, 830 Third Avenue, Brooklyn, Kings County, NY

  1. 3. EXTERIOR VIEW TO THE NORTHEAST OF A RAILROAD CAR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. EXTERIOR VIEW TO THE NORTHEAST OF A RAILROAD CAR ON THE TRACKS AND THE PARTS OF AN ENGINE STAND. - Nevada Test Site, Pluto Facility, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  2. 78 FR 37660 - American Surface Lines, LLC-Acquisition and Operation Exemption-Mikrut Properties, LLLP

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... Canadian Pacific Railroad Company (CP) at or near Pelzer Street to a transloading facility owned and... tracks that connect to CP's line have been operated pursuant to a private siding agreement between CP...

  3. 78 FR 75959 - CaterParrott Railnet, LLC-Change in Operators Exemption-Rail Lines of Central of Georgia Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-13

    ... Central of Georgia Railroad Company CaterParrott Railnet, LLC (CPR), a Class III rail carrier, has filed a..., Inc. (SCS), to CPR on the following rail lines located in Georgia and owned by Central of Georgia... served Sept. 17, 2009). According to CPR, an agreement has been reached between the parties under...

  4. Neighborhood Facilities: A Study of Operating Facilities. Community Development Evaluation Series, Number 1.

    ERIC Educational Resources Information Center

    Department of Housing and Urban Development, Washington, DC.

    This report, the first of a series attempting to provide information on community development programs, Federal processes, and policies, presents an evaluation of the operating centers constructed with Housing and Urban Development Neighborhood Facilities grants. The program evaluated provides grants to help local public bodies finance development…

  5. Pre-operational safety appraisal Tritiated Scrap Recovery Facility, Mound facility

    SciTech Connect

    Dauby, J.J.; Flanagan, T.M.; Metcalf, L.W.; Rhinehammer, T.B.

    1996-07-01

    The purpose of this report is to identify, assess, and document the hazards which are associated with the proposed operation of the Tritiated Scrap Recovery Facility at Mound Facility. A Pre-operational Safety Appraisal is a requirement as stated in Department of Energy Order 5481.1, Safety Analysis and Review System. The operations to be conducted in the new Tritiated Scrap Waste Recovery Facility are not new, but a continuation of a prime mission of Mound`s i.e. recovery of tritium from waste produced throughout the DOE complex. The new facility is a replacement of an existing process started in the early 1960`s and incorporates numerous design changes to enhance personnel and environmental safety. This report also documents the safety of a one time operation involving the recovery of tritium from material obtained by the Department of Energy from the State of Arizona. This project will involve the processing of 240,000 curies of tritium contained in glass ampoules that were to be used in items such as luminous dial watches. These were manufactured by the now defunct American Atomics Corporation, Tucson, Arizona.

  6. Man-vehicle systems research facility: Design and operating characteristics

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The Man-Vehicle Systems Research Facility (MVSRF) provides the capability of simulating aircraft (two with full crews), en route and terminal air traffic control and aircrew interactions, and advanced cockpit (1995) display representative of future generations of aircraft, all within the full mission context. The characteristics of this facility derive from research, addressing critical human factors issues that pertain to: (1) information requirements for the utilization and integration of advanced electronic display systems, (2) the interaction and distribution of responsibilities between aircrews and ground controllers, and (3) the automation of aircrew functions. This research has emphasized the need for high fidelity in simulations and for the capability to conduct full mission simulations of relevant aircraft operations. This report briefly describes the MVSRF design and operating characteristics.

  7. Feasibility study for a transportation operations system cask maintenance facility

    SciTech Connect

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  8. Embracing Safe Ground Test Facility Operations and Maintenance

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  9. Solid Waste Operations Complex (SWOC) Facilities Sprinkler System Hydraulic Calculations

    SciTech Connect

    KERSTEN, J.K.

    2003-07-11

    The attached calculations demonstrate sprinkler system operational water requirements as determined by hydraulic analysis. Hydraulic calculations for the waste storage buildings of the Central Waste Complex (CWC), T Plant, and Waste Receiving and Packaging (WRAP) facility are based upon flow testing performed by Fire Protection Engineers from the Hanford Fire Marshal's office. The calculations received peer review and approval prior to release. The hydraulic analysis program HASS Computer Program' (under license number 1609051210) is used to perform all analyses contained in this document. Hydraulic calculations demonstrate sprinkler system operability based upon each individual system design and available water supply under the most restrictive conditions.

  10. Design and operation of an outdoor microalgae test facility

    SciTech Connect

    Weissman, J.C.; Tillett, D.M.; Goebel, R.P. )

    1989-10-01

    The objective of the project covered in this report is to establish and operate a facility in the American Southwest to test the concept of producing microalgae on a large scale. This microalgae would then be used as a feedstock for producing liquid fuels. The site chosen for this project was an existing water research station in Roswell, New Mexico; the climate and water resources are representative of those in the Southwest. For this project, researchers tested specific designs, modes of operation, and strains of microalgae; proposed and evaluated modifications to technological concepts; and assessed the progress toward meeting cost objectives.

  11. Operational readiness: an integral part of the facility planning process.

    PubMed

    Kidd, LeeAnne; Howe, Rob

    2014-01-01

    Large capital building projects benefit from an operational readiness strategy prior to new facility occupancy. St. Joseph's Healthcare used a structured approach for their readiness planning that included individual work plan meetings, tools for ensuring integration across programs and services and process improvement support to ensure a smooth transition. Over 1100 staff were oriented using a Train-the-Trainer model. Significant effort was required to co-ordinate the customized training, which involved "staffing up" to ensure sufficient resources for backfill. Operational readiness planning places additional demands on managers, requiring support and assistance from dedicated resources both prior to occupancy and several months post-move. PMID:25906468

  12. National Transonic Facility: A review of the operational plan

    NASA Technical Reports Server (NTRS)

    Liepmann, H. W.; Black, R. E.; Dietz, R. O.; Kirchner, M. E.; Sears, W. R.

    1980-01-01

    The proposed National Transonic Facility (NTF) operational plan is reviewed. The NTF will provide an aerodynamic test capability significantly exceeding that of other transonic regime wind tunnels now available. A limited number of academic research program that might use the NTF are suggested. It is concluded that the NTF operational plan is useful for management, technical, instrumentation, and model building techniques available in the specialized field of aerodynamic analysis and simulation. It is also suggested that NASA hold an annual conference to discuss wind tunnel research results and to report on developments that will further improve the utilization and cost effectiveness of the NTF and other wind tunnels.

  13. National Ignition Facility Control and Information System Operational Tools

    SciTech Connect

    Marshall, C D; Beeler, R G; Bowers, G A; Carey, R W; Fisher, J M; Foxworthy, C B; Frazier, T M; Mathisen, D G; Lagin, L J; Rhodes, J J; Shaw, M J

    2009-10-08

    The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a {approx}2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint the size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.

  14. Design and operation of the Surry Radwaste Facility

    SciTech Connect

    Morris, L.L.; Halverson, W.C.

    1993-12-31

    In September 1991, Virginia Power started processing radioactive waste with a new Radwaste Facility at the Surry Power Station near Norfolk, Virginia. The Surry Radwaste Facility (SRF) was designed to process and store liquid waste, laundry waste, dry active waste, radioactive filters and spent ion-exchange resin. It also provides on-site decontamination services and a fully equipped hot machine shop. The NRC has recognized that the amount of planning and design, and the attention to detail, that was expended on the SRF Project in order to minimize personnel exposure and ensure efficient operation, is a licensee strength. Through its first year of operation, the facility has proven very successful. Using evaporation and demineralization, over 30 million liters of liquid have been released with no chemical impurities or detectable radioactivity (excluding tritium). Over 623,000 liters of concentrated boric acid waste liquid have been processed with the Bitumen Solidification System yielding 139,880 liters (660 drums) of low level Class A-Stable waste. Additional economic benefits will be realized as the effectiveness of the processing systems continues to improve due to increased operational experience and ergonomics.

  15. SILEX ground segment control facilities and flight operations

    NASA Astrophysics Data System (ADS)

    Demelenne, Benoit; Tolker-Nielsen, Toni; Guillen, Jean-Claude

    1999-04-01

    The European Space Agency is going to conduct an inter orbit link experiment which will connect a low Earth orbiting satellite and a Geostationary satellite via optical terminals. This experiment has been called SILEX (Semiconductor Inter satellite Link Experiment). Two payloads have been built. One called PASTEL (PASsager de TELecommunication) has been embarked on the French Earth observation satellite SPOT4 which has been launched successfully in March 1998. The future European experimental data relay satellite ARTEMIS (Advanced Relay and TEchnology MISsion), which will route the data to ground, will carry the OPALE terminal (Optical Payload Experiment). The European Space Agency is responsible for the operation of both terminals. Due to the complexity and experimental character of this new optical technology, the development, preparation and validation of the ground segment control facilities required a long series of technical and operational qualification tests. This paper is presenting the operations concept and the early results of the PASTEL in orbit operations.

  16. 21 CFR 1250.51 - Railroad conveyances; discharge of wastes.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Railroad conveyances; discharge of wastes. 1250.51 Section 1250.51 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES... CONVEYANCE SANITATION Equipment and Operation of Land and Air Conveyances § 1250.51 Railroad...

  17. PIRATE: A Remotely Operable Telescope Facility for Research and Education

    NASA Astrophysics Data System (ADS)

    Holmes, S.; Kolb, U.; Haswell, C. A.; Burwitz, V.; Lucas, R. J.; Rodriguez, J.; Rolfe, S. M.; Rostron, J.; Barker, J.

    2011-10-01

    We introduce PIRATE, a new remotely operable telescope facility for use in research and education, constructed from off-the-shelf hardware, operated by The Open University. We focus on the PIRATE Mark 1 operational phase, in which PIRATE was equipped with a widely used 0.35 m Schmidt-Cassegrain system (now replaced with a 0.425 m corrected Dall-Kirkham astrograph). Situated at the Observatori Astronòmic de Mallorca, PIRATE is currently used to follow up potential transiting extrasolar planet candidates produced by the SuperWASP North experiment, as well as to hunt for novae in M31 and other nearby galaxies. It is operated by a mixture of commercially available software and proprietary software developed at the Open University. We discuss problems associated with performing precision time-series photometry when using a German Equatorial Mount, investigating the overall performance of such off-the-shelf solutions in both research and teaching applications. We conclude that PIRATE is a cost-effective research facility, and it also provides exciting prospects for undergraduate astronomy. PIRATE has broken new ground in offering practical astronomy education to distance-learning students in their own homes.

  18. The insertion device magnetic measurement facility: Prototype and operational procedures

    SciTech Connect

    Burkel, L.; Dejus, R.; Maines, J.; O`Brien, J.; Vasserman, I.; Pfleuger, J.

    1993-03-01

    This report is a description of the current status of the magnetic measurement facility and is a basic instructional manual for the operation of the facility and its components. Please refer to the appendices for more detailed information about specific components and procedures. The purpose of the magnetic measurement facility is to take accurate measurements of the magnetic field in the gay of the IDs in order to determine the effect of the ID on the stored particle beam and the emitted radiation. The facility will also play an important role when evaluating new ideas, novel devices, and inhouse prototypes as part of the ongoing research and development program at the APS. The measurements will be performed with both moving search coils and moving Hall probes. The IDs will be evaluated by computer modeling of the emitted radiation for any given (measured) magnetic field map. The quality of the magnetic field will be described in terms of integrated multipoles for the effect on Storage Ring performance and in terms of the derived trajectories for the emitted radiation. Before being installed on the Storage Ring, every device will be measured and characterized to assure that it is compatible with Storage Ring requirements and radiation specifications. The accuracy that the APS needs to achieve for magnetic measurements will be based on these specifications.

  19. Operation of an industrial radiation processing facility in Mexico

    NASA Astrophysics Data System (ADS)

    Torres C., Gilberto

    A 10 years old JS-6500 industrial Cobalt 60 irradiator was installed in 1980 at the ININ Nuclear Center in Mexico with 960 kGy. The facility was commissioning in August with some minor changes with respect to the original AECL design, in order to give services to different industries and also to do research in several fields. During that year promotional activities were done to increase interest from industry in the use of radiation processing. In 1981, an interruption due to pool's leakage and its reparation, put the facility out of operation. During the next three years the demand increases but never reach more than 50% if the capacity. In that time, the potential users did not show confidence in the process, even knowing that health authorities approved with no restrictions radiation sterilization. Actually, there are 34 different companies irradiating 48 different products. Even those within the same grouping, require different minimum and maximum radiation doses, so the facility has been operated combining products and valumes. The experiences are presented in this paper. Also, maintenance of the irradiator is discussed and some modifications to the original programme have been done due to the necessity to use local spare parts instead of imported ones.

  20. EnergySolution's Clive Disposal Facility Operational Research Model - 13475

    SciTech Connect

    Nissley, Paul; Berry, Joanne

    2013-07-01

    EnergySolutions owns and operates a licensed, commercial low-level radioactive waste disposal facility located in Clive, Utah. The Clive site receives low-level radioactive waste from various locations within the United States via bulk truck, containerised truck, enclosed truck, bulk rail-cars, rail boxcars, and rail inter-modals. Waste packages are unloaded, characterized, processed, and disposed of at the Clive site. Examples of low-level radioactive waste arriving at Clive include, but are not limited to, contaminated soil/debris, spent nuclear power plant components, and medical waste. Generators of low-level radioactive waste typically include nuclear power plants, hospitals, national laboratories, and various United States government operated waste sites. Over the past few years, poor economic conditions have significantly reduced the number of shipments to Clive. With less revenue coming in from processing shipments, Clive needed to keep its expenses down if it was going to maintain past levels of profitability. The Operational Research group of EnergySolutions were asked to develop a simulation model to help identify any improvement opportunities that would increase overall operating efficiency and reduce costs at the Clive Facility. The Clive operations research model simulates the receipt, movement, and processing requirements of shipments arriving at the facility. The model includes shipment schedules, processing times of various waste types, labor requirements, shift schedules, and site equipment availability. The Clive operations research model has been developed using the WITNESS{sup TM} process simulation software, which is developed by the Lanner Group. The major goals of this project were to: - identify processing bottlenecks that could reduce the turnaround time from shipment arrival to disposal; - evaluate the use (or idle time) of labor and equipment; - project future operational requirements under different forecasted scenarios. By identifying

  1. Lunar Transportation Facilities and Operations Study, option 2

    NASA Technical Reports Server (NTRS)

    1992-01-01

    During the Option 2 period of the Lunar Transportation Facilities and Operations Study (LTFOS), a joint McDonnell Douglas Space Systems Company Kennedy Space Center (MDSSC-KSC) and National Aeronautics and Space Administration Kennedy Space Center (NASA-KSC) Study team conducted a comparison of the functional testing of the RL-10 and Space Shuttle Main Engine, a quick-look impact assessment of the Synthesis Group Report, and a detailed assessment of the Synthesis Group Report. The results of these KSC LTFOS team efforts are included. The most recent study task effort was a detailed assessment of the Synthesis Group Report. The assessment was conducted to determine the impact on planetary launch and landing facilities and operations. The result of that effort is a report entitled 'Analysis of the Synthesis Group Report, its Architectures and their Impacts on PSS Launch and Landing Operations' and is contained in Appendix A. The report is structured in a briefing format with facing pages as opposed to a narrative style. A quick-look assessment of the Synthesis Group Report was conducted to determine the impact of implementing the recommendations of the Synthesis Group on KSC launch facilities and operations. The data was documented in a presentation format as requested by Kennedy Space Center Technology and Advanced Projects Office and is included in Appendix B. Appendix C is a white paper on the comparison of the functional testing of the RL-10 and Space Shuttle Main Engine. The comparison was undertaken to provide insight regarding common test requirements that would be applicable to Lunar and Mars Excursion Vehicles (LEV and MEV).

  2. SSBRP User Operations Facility (UOF) Overview and Development Strategy

    NASA Technical Reports Server (NTRS)

    Picinich, Lou; Stone, Thom; Sun, Charles; Windrem, May; Givens, John J. (Technical Monitor)

    1995-01-01

    This paper will present the Space Station Biological Research Project (SSBRP) User Operations Facility (UOF) architecture and development strategy. A major element of the UOF at NASA Ames Research Center, the Communication and Data System (CDS) will be the primary focus of the discussions. CDS operational, telescience, security, and development objectives will be discussed along with CDS implementation strategy. The implementation strategy discussions will include: Object Oriented Analysis & Design, System & Software Prototyping, and Technology Utilization. A CDS design overview that includes: CDS Context Diagram, CDS Architecture, Object Models, Use Cases, and User Interfaces will also be presented. CDS development brings together "cutting edge" technologies and techniques such as: object oriented development, network security, multimedia networking, web-based data distribution, JAVA, and graphical user interfaces. Use of these "cutting edge" technologies and techniques translates directly to lower development and operations costs.

  3. Five years operating experience at the Fast Flux Test Facility

    SciTech Connect

    Baumhardt, R. J.; Bechtold, R. A.

    1987-04-01

    The Fast Flux Test Facility (FFTF) is a 400 Mw(t), loop-type, sodium-cooled, fast neutron reactor. It is operated by the Westinghouse Hanford Company for the United States Department of Energy at Richland, Washington. The FFTF is a multipurpose test reactor used to irradiate fuels and materials for programs such as Liquid Metal Reactor (LMR) research, fusion research, space power systems, isotope production and international research. FFTF is also used for testing concepts to be used in Advanced Reactors which will be designed to maximize passive safety features and not require complex shutdown systems to assure safe shutdown and heat removal. The FFTF also provides experience in the operation and maintenance of a reactor having prototypic components and systems typical of large LMR (LMFBR) power plants. The 5 year operational performance of the FFTF reactor is discussed in this report. 6 refs., 10 figs., 2 tabs.

  4. Personnel Access Control System Evaluation for National Ignition Facility Operations

    SciTech Connect

    Altenbach, T; Brereton, S.; Hermes, G.; Singh, M.

    2001-06-01

    The purpose of this document is to analyze the baseline Access Control System for the National Ignition Facility (NIF), and to assess its effectiveness at controlling access to hazardous locations during full NIF operations. It reviews the various hazards present during a NIF shot sequence, and evaluates the effectiveness of the applicable set of controls at preventing access while the hazards are present. It considers only those hazards that could potentially be lethal. In addition, various types of technologies that might be applicable at NIF are reviewed, as are systems currently in use at other facilities requiring access control for safety reasons. Recommendations on how this system might be modified to reduce risk are made.

  5. Upgrading railroad test track, Pueblo, Colorado

    SciTech Connect

    Briggs, K. III; Chamberlain, K.

    1997-01-01

    The railroad test track (RTT) at the Transportation Technology Center (TTC) in Pueblo, Colo., was constructed in the early 1970s to support high-speed testing of new railroad rolling stock. Through the years it has been used to test a wide range of railroad passenger and freight cars and locomotives. Now, 20 years later, a new high-speed train set is being procured by Amtrak for service in the improved Northeast Corridor. The test facilities at Pueblo will play an important role in acceptance and safety testing of new high-speed train sets in the US. The Federal Railroad Administration (FRA) commissioned a study to review the existing condition of the test track and to make recommendations as to possible improvement options so that the facility would be able to test current and future generations of high-speed rail equipment. This paper describes the condition of the test track and explores ways in which it may be modified to accommodate the testing of high-speed train technologies in the near future and into the next century.

  6. Operational Concept for the Smart Landing Facility (SLF)

    NASA Technical Reports Server (NTRS)

    Thompson, S. D.; Bussolari, S. R.

    2001-01-01

    The purpose of this document is to describe an operational concept for the Smart Landing Facility (SLF). The SLF is proposed as a component of the Small Aircraft Transportation System (SATS) and is envisioned to utilize Communication, Navigation, Surveillance and Air Traffic Management (CNS/ATM) technologies to support higher-volume air traffic operations in a wider variety of weather conditions than are currently possible at airports without an Air Traffic Control Tower (ATCT) or Terminal Radar Approach Control (TRACON). In order to accomplish this, the SLF will provide aircraft sequencing and separation within its terminal airspace (the SLF traffic area) and on the airport surface. The approach taken in this report is to first define and describe the SLF environment and the type of operations and aircraft that must be supported. Services currently provided by an ATCT and TRACON are reviewed and assembled into a set of high-level operational functions. A description of the applicable CNS/ATM technologies that have been deployed in the NAS (National Airspace System) or have been demonstrated to be operationally feasible is presented. A candidate SLF system concept that employs the CNS/ATM technologies is described. This is followed by SLF operational scenarios for minimally-equipped aircraft and for aircraft fully-equipped to make full use of SLF services. An assessment is made of the SLF technology and key research issues are identified.

  7. Report of the Task Group on operation Department of Energy tritium facilities

    SciTech Connect

    Not Available

    1991-10-01

    This report discusses the following topics on the operation of DOE Tritium facilities: Environment, Safety, and Health Aspects of Tritium; Management of Operations and Maintenance Functions; Safe Shutdown of Tritium Facilities; Management of the Facility Safety Envelope; Maintenance of Qualified Tritium Handling Personnel; DOE Tritium Management Strategy; Radiological Control Philosophy; Implementation of DOE Requirements; Management of Tritium Residues; Inconsistent Application of Requirements for Measurement of Tritium Effluents; Interdependence of Tritium Facilities; Technical Communication among Facilities; Incorporation of Confinement Technologies into New Facilities; Operation/Management Requirements for New Tritium Facilities; and Safety Management Issues at Department of Energy Tritium Facilities.

  8. Solar and Heliospheric Observatory (SOHO) Experimenters' Operations Facility (EOF)

    NASA Technical Reports Server (NTRS)

    Larduinat, Eliane; Potter, William

    1994-01-01

    This paper describes the SOHO Instrumenters' Operations Facility (EOF) project. The EOF is the element of the SOHO ground system at the Goddard Space Flight Center that provides the interface between the SOHO scientists and the other ground system elements. This paper first describes the development context of the SOHO EOF. It provides an overview of the SOHO mission within the International Solar-Terrestrial Physics (ISTP) project, and discusses the SOHO scientific objectives. The second part of this paper presents the implementation of the SOHO EOF, its innovative features, its possible applications to other missions, and its potential for use as part of a fully integrated ground control system.

  9. Raccoon Mountain pumped-storage facility operational fish monitoring report

    SciTech Connect

    Buchanan, J.P.; Pasch, R.W.; Smith, A.O.; Swor, C.T.; Tomljanovich, D.A.

    1983-09-01

    The impact of the Raccoon Mountain Pumped-Storage Facility operations on fisheries resources in the Nickajack Reservoir was investigated. Analyses of data collected from 1979 through 1981 on population status and distribution of adults, larvae and eggs are presented with comparisons of preoperational fisheries monitoring data collected by the TVA from 1977 through 1978. Although minor differences in composition of dominant species, and slight declines in standing stock of some species were noted, no major impacts were identified. Appendix B contains a short report entitled Nickajack Reservoir Ictiobine Study 1979 by Edwin Scott Jr. 7 references, 46 figures, 31 tables.

  10. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    NASA Technical Reports Server (NTRS)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  11. 77 FR 27856 - Tennessee Southern Railroad Company, Patriot Rail, LLC, Patriot Rail Holdings LLC, and Patriot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... LLC, and Patriot Rail Corp.--Continuance in Control Exemption--Kingman Terminal Railroad, LLC... notice of exemption under 49 CFR 180.2(d)(2) to continue in control of Kingman Terminal Railroad, LLC... filed verified notice of exemption in Kingman Terminal Railroad, LLC--Operation Exemption--...

  12. 23 CFR 646.210 - Classification of projects and railroad share of the cost.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Pursuant to 23 U.S.C. 130(b), and 49 CFR 1.48: (1) Projects for grade crossing improvements are deemed to... 23 Highways 1 2013-04-01 2013-04-01 false Classification of projects and railroad share of the... ENGINEERING AND TRAFFIC OPERATIONS RAILROADS Railroad-Highway Projects § 646.210 Classification of...

  13. 49 CFR 1.89 - Delegations to the Federal Railroad Adminstrator.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false Delegations to the Federal Railroad Adminstrator... DELEGATION OF POWERS AND DUTIES Operating Administrations § 1.89 Delegations to the Federal Railroad Adminstrator. The Federal Railroad Administrator is delegated authority to: (a) Carry out the functions...

  14. 49 CFR 1.89 - Delegations to the Federal Railroad Adminstrator.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Delegations to the Federal Railroad Adminstrator... DELEGATION OF POWERS AND DUTIES Operating Administrations § 1.89 Delegations to the Federal Railroad Adminstrator. The Federal Railroad Administrator is delegated authority to: (a) Carry out the functions...

  15. 49 CFR 1.89 - Delegations to the Federal Railroad Adminstrator.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false Delegations to the Federal Railroad Adminstrator... DELEGATION OF POWERS AND DUTIES Operating Administrations § 1.89 Delegations to the Federal Railroad Adminstrator. The Federal Railroad Administrator is delegated authority to: (a) Carry out the functions...

  16. Global Pursuits: The Underground Railroad

    ERIC Educational Resources Information Center

    School Arts: The Art Education Magazine for Teachers, 2004

    2004-01-01

    This brief article describes Charles T. Webber's oil on canvas painting, "The Underground Railroad, 1893." The subject of this painting is the Underground Railroad, which today has become an American legend. The Underground Railroad was not a systematic means of transportation, but rather a secretive process that allowed fugitive slaves to escape…

  17. Optimizing Watershed Management by Coordinated Operation of Storing Facilities

    NASA Astrophysics Data System (ADS)

    Anghileri, Daniela; Castelletti, Andrea; Pianosi, Francesca; Soncini-Sessa, Rodolfo; Weber, Enrico

    2013-04-01

    Water storing facilities in a watershed are very often operated independently one to another to meet specific operating objectives, with no information sharing among the operators. This uncoordinated approach might result in upstream-downstream disputes and conflicts among different water users, or inefficiencies in the watershed management, when looked at from the viewpoint of an ideal central decision-maker. In this study, we propose an approach in two steps to design coordination mechanisms at the watershed scale with the ultimate goal of enlarging the space for negotiated agreements between competing uses and improve the overall system efficiency. First, we compute the multi-objective centralized solution to assess the maximum potential benefits of a shift from a sector-by-sector to an ideal fully coordinated perspective. Then, we analyze the Pareto-optimal operating policies to gain insight into suitable strategies to foster cooperation or impose coordination among the involved agents. The approach is demonstrated on an Alpine watershed in Italy where a long lasting conflict exists between upstream hydropower production and downstream irrigation water users. Results show that a coordination mechanism can be designed that drive the current uncoordinated structure towards the performance of the ideal centralized operation.

  18. The Injection Facility at Ketzin: Technical Installations & Operation

    NASA Astrophysics Data System (ADS)

    Moeller, F.; Bannach, A.; Becker, W.; Koehler, S.

    2009-04-01

    The injection facility consists of 5 main plunger pumps (0…1.000 kg/h), a heating device (305 kWel.) and two intermediate storage tanks (50 to, each). One additional smaller pump has been installed to allow for smaller injection rates (around 300 kg/h). The facility is designed to implement a CO2 stream of 300 kg/h to 3.250 kg/h (200 kg/h stepwise) at 50 °C at the heater outlet, resulting in a maximum amount of 78 to per day. An overall control and automation system is in place for steering the entire injection process and monitoring the relevant parameters (i.e. CO2 flow, temperature along the injection string, pressure data from the formation and the wellheads etc.). All emergency shut-down (ESD) functionality is software independent and has been certified by local authorities and technical control boards. Besides the presentation of of the technical facilities the talk will give an overview on the legal organisation of the injection operation and will light on so far experienced wellbore and reservoir behaviour.

  19. The Mulberry Cogeneration Facility: Design features and operating success

    SciTech Connect

    Jasper, W.M.; Wierschem, R.A.; Gray, D.C.

    1995-12-31

    The Mulberry Cogeneration Facility is in successful, reliable, and profitable service, with the complex requirements of zero discharge, extensive water treatment, process steam supply, and inlet chillers having been reduced to routine, automated operation. What was initially visualized by the developer as a straightforward combined cycle plant became much more than that as the various requirements for environmental and regulatory compliance became necessities, along with the desire to maximize output and revenues in response to growing power demands. A delicate balance exists between a financially successful cogeneration project and the Owners` obligation to the community and the environment. As competitive pressures grow and expectations of investors, insurers, operators, and the public increase, still more creativity will be required to provide a safe, reliable, cost-effective plant on ever shorter schedules.

  20. Atmospheric Radiation Measurement program climate research facility operations quarterly report.

    SciTech Connect

    Sisterson, D. L.; Decision and Information Sciences

    2006-09-06

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.60 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.40 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.80 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive

  1. Kistler reusable vehicle facility design and operational approach

    NASA Astrophysics Data System (ADS)

    Fagan, D.; McInerney, F.; Johnston, C.; Tolson, B.

    Kistler Aerospace Corporation is designing and developing the K-1, the world's first fully reusable aerospace vehicle to deliver satellites into orbit. The K-1 vehicle test program will be conducted in Woomera, Australia, with commercial operations scheduled to begin shortly afterwards. Both stages of the K-1 will return to the launch site utilizing parachutes and airbags for a soft landing within 24 h after launch. The turnaround flow of the two stages will cycle from landing site to a maintenance/refurbishment facility and through the next launch in only 9 days. Payload processing will occur in a separate facility in parallel with recovery and refurbishment operations. The vehicle design and on-board checkout capability of the avionics system eliminates the need for an abundance of ground checkout equipment. Payload integration, vehicle assembly, and K-1 transport to the launch pad will be performed horizontally, simplifying processing and reducing infrastructure requirements. This simple, innovative, and cost-effective approach will allow Kistler to offer its customers flexible, low-cost, and on-demand launch services.

  2. Railroad management planning. 1974-October, 1981 (citations from the NTIS data base). Report for 1974-Oct 81

    SciTech Connect

    Not Available

    1981-11-01

    Studies are presented of railroad planning concerning operating costs, yard operations, intermodal systems, railway abandonment and consolidation, efficiency in operations and services, freight car utilization systems, forecasting future railroad freight and passenger market and the potential of energy conservation in railroad transportation. (This updated bibliography contains 281 citations, 79 of which are new entries to the previous edition.)

  3. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    ERIC Educational Resources Information Center

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  4. 77 FR 27533 - Application for Presidential Permit To Construct, Operate and Maintain Pipeline Facilities on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-10

    ... Application for Presidential Permit To Construct, Operate and Maintain Pipeline Facilities on the Border of... Presidential Permit to Construct, Operate and Maintain Pipeline Facilities on the Border of the United States... construct, operate and maintain pipeline facilities on the border of the United States from...

  5. Segmented undulator operation at the SPARC-FEL test facility

    NASA Astrophysics Data System (ADS)

    Ciocci, Franco; Anania, Maria Pia; Artioli, Marcello; Bellaveglia, Marco; Carpanese, Mariano; Chiadroni, Enrica; Cianchi, Alessandro; Dattoli, Giuseppe; Di Giovenale, Domenico; Di Palma, Emanuele; Di Pirro, Giampiero; Ferrario, Massimo; Mostacci, Andrea; Petralia, Alberto; Petrillo, Vittoria; Pompili, Riccardo; Sabia, Elio; Spassovsky, Ivan; Surrenti, Vincenzo; Vaccarezza, Cristina; Villa, Fabio

    2015-05-01

    A short period undulator (1.4 cm) has been designed for the SPARC-FEL test facility and has been realized in collaboration with KYMA Srl. It has been installed on the undulator line at SPARC. The undulator, operating in a delta like mode, has been used as radiator in a segmented configuration. The first stage being provided by the five undulators of the SPARC FEL source "old" chain, with period 2.8 cm. The KYMA undulator has a quatrefoil structure, a high magnetic field homogeneity and focuses both in vertical and radial directions. The two sections, namely the bunching and radiating parts, are arranged in such a way that the second is adjusted on a harmonic of the first. Laser action occurring in the second part, is due to the bunching acquired in the first. Simulations of the temporal and spectral profiles in different electron beam operating conditions are reported, as well as the evolution of the longitudinal phase space. The agreement with the experimental results is discussed The importance of this experiment is at least threefold: 1) It proves that the segmented undulator can successfully be operated 2) It proves that the laser emission in the last undulator is entirely due to the bunching mechanism, being no second harmonic signal present in the first segment 3) Encourages various improvements of the configuration itself, as e.g. the use of a further undulator with variable magnetic field configuration in order to obtain a laser field with adjustable polarization.

  6. Proton Therapy Facility Planning From a Clinical and Operational Model.

    PubMed

    Das, Indra J; Moskvin, Vadim P; Zhao, Qingya; Cheng, Chee-Wai; Johnstone, Peter A

    2015-10-01

    This paper provides a model for planning a new proton therapy center based on clinical data, referral pattern, beam utilization and technical considerations. The patient-specific data for the depth of targets from skin in each beam angle were reviewed at our center providing megavoltage photon external beam and proton beam therapy respectively. Further, data on insurance providers, disease sites, treatment depths, snout size and the beam angle utilization from the patients treated at our proton facility were collected and analyzed for their utilization and their impact on the facility cost. The most common disease sites treated at our center are head and neck, brain, sarcoma and pediatric malignancies. From this analysis, it is shown that the tumor depth from skin surface has a bimodal distribution (peak at 12 and 26 cm) that has significant impact on the maximum proton energy, requiring the energy in the range of 130-230 MeV. The choice of beam angles also showed a distinct pattern: mainly at 90° and 270°; this indicates that the number of gantries may be minimized. Snout usage data showed that 70% of the patients are treated with 10 cm snouts. The cost of proton beam therapy depends largely on the type of machine, maximum beam energy and the choice of gantry versus fixed beam line. Our study indicates that for a 4-room center, only two gantry rooms could be needed at the present pattern of the patient cohorts, thus significantly reducing the initial capital cost. In the USA, 95% and 100% of patients can be treated with 200 and 230 MeV proton beam respectively. Use of multi-leaf collimators and pencil beam scanning may further reduce the operational cost of the facility. PMID:24988058

  7. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1995 Annual Report.

    SciTech Connect

    Rowan, Gerald D.

    1996-05-01

    The Confederated Tribes of the Umatilla Indian Reservoir (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead, fall chinook and coho salmon. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids from Umatilla River summer steelhead and coho salmon broodstock for monitoring and evaluation purposes. Coded-wire tag recovery information was accessed to determine the contribution of Umatilla river releases to ocean, Columbia River and Umatilla River fisheries.

  8. MagLev Cobra: Test Facilities and Operational Experiments

    NASA Astrophysics Data System (ADS)

    Sotelo, G. G.; Dias, D. H. J. N.; de Oliveira, R. A. H.; Ferreira, A. C.; De Andrade, R., Jr.; Stephan, R. M.

    2014-05-01

    The superconducting MagLev technology for transportation systems is becoming mature due to the research and developing effort of recent years. The Brazilian project, named MagLev-Cobra, started in 1998. It has the goal of developing a superconducting levitation vehicle for urban areas. The adopted levitation technology is based on the diamagnetic and the flux pinning properties of YBa2Cu3O7-δ (YBCO) bulk blocks in the interaction with Nd-Fe-B permanent magnets. A laboratory test facility with permanent magnet guideway, linear induction motor and one vehicle module is been built to investigate its operation. The MagLev-Cobra project state of the art is presented in the present paper, describing some construction details of the new test line with 200 m.

  9. Regulation study for the facility control system design at the Facility Operations Center at TA55

    SciTech Connect

    1994-03-16

    NMT-8 is proposing to upgrade the existing Facility Control System (FCS) located within the Facility Operations Center (FOC) at the TA-55 Plutonium Processing and Handling Facility (PPHF). The FCS modifications will upgrade the existing electronics to provide better reliability of system functions. Changes include replacement of the FCS computers and field multiplex units which are used for transmitting systems data. Data collected at the FCS include temperature, pressure, contact closures, etc., and are used for monitoring and/or control of key systems at TA-55. Monitoring is provided for the electrical power system status, PF-4 HVAC air balance status (Static Differential pressure), HVAC fan system status, site chill water return temperature, fire system information, and radioactive constant air monitors alarm information, site compressed air pressure and other key systems used at TA-55. Control output signals are provided for PF-4 HVAC systems, and selected alarms for criticality, fire, loss of pressure in confinement systems. A detailed description of the FCS modifications is provided in Section 2.

  10. Some Operating Experience and Problems Encountered During Operation of a Free-jet Facility

    NASA Technical Reports Server (NTRS)

    Mcaulay, John E; Prince, William R

    1957-01-01

    During a free-jet investigation of a 28-inch ram-jet engine at a Mach number of 2.35, flow pulsation at the engine inlet were discovered which proved to have an effect on the engine performance and operational characteristics, particularly the engine rich blowout limits. This report discusses the finding of the flow pulsations, their elimination, and effect. Other facility characteristics, such as the establishment of flow simulation and the degree of subcritical operation of the diffuser, are also explained.

  11. Transuranic (Tru) waste volume reduction operations at a plutonium facility

    SciTech Connect

    Cournoyer, Michael E; Nixon, Archie E; Dodge, Robert L; Fife, Keith W; Sandoval, Arnold M; Garcia, Vincent E

    2010-01-01

    Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA 55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). Size-reduction operations on glovebox equipment are a common activity when a process has been discontinued and the room is being modified to support a new customer. The Actin ide Processing Group at TA-55 uses one-meter-long glass columns to process plutonium. Disposal of used columns is a challenge, since they must be size-reduced to get them out of the glovebox. The task is a high-risk operation because the glass shards that are generated can puncture the bag-out bags, leather protectors, glovebox gloves, and the worker's skin when completing the task. One of the Lessons Learned from these operations is that Laboratory management should critically evaluate each hazard and provide more effective measures to prevent personnel injury. A bag made of puncture-resistant material was one of these enhanced controls. We have investigated the effectiveness of these bags and have found that they safely and effectively permit glass objects to be reduced to small pieces with a plastic or rubber mallet; the waste can then be easily poured into a container for removal from the glove box as non-compactable transuranic (TRU) waste. This size-reduction operation reduces solid TRU waste generation by almost 2% times. Replacing one-time-use bag-out bags with multiple-use glass crushing bags also contributes to reducing generated waste. In addition, significant costs from contamination, cleanup, and preparation of incident documentation are avoided. This effort contributes to the Los Alamos National

  12. Development and operation of a mobile test facility for education

    NASA Astrophysics Data System (ADS)

    Davis, Christopher T.

    The automotive industry saw a large shift towards vehicle electrification after the turn of the century. It became necessary to ensure that new and existing engineers were qualified to design and calibrate these new systems. To ensure this training, Michigan Tech received a grant to develop a curriculum based around vehicle electrification. As part of this agenda, the Michigan Tech Mobile Laboratory was developed to provide hands-on training for professional engineers and technicians in hybrid electric vehicles and vehicle electrification. The Mobile Lab has since then increased the scope of the delivered curriculum to include other automotive areas and even customizable course content to meet specific needs. This thesis outlines the development of the Mobile Laboratory and its powertrain test facilities. The focus of this thesis is to discuss the different hardware and software systems within the lab and test cells. Detailed instructions on the operation and maintenance of each of the systems are discussed. In addition, this thesis outlines the setup and operation of the necessary equipment for several of the experiments for the on and off campus courses and seminars.

  13. WIPP Remote Handled Waste Facility: Performance Dry Run Operations

    SciTech Connect

    Burrington, T. P.; Britain, R. M.; Cassingham, S. T.

    2003-02-24

    The Remote Handled (RH) TRU Waste Handling Facility at the Waste Isolation Pilot Plant (WIPP) was recently upgraded and modified in preparation for handling and disposal of RH Transuranic (TRU) waste. This modification will allow processing of RH-TRU waste arriving at the WIPP site in two different types of shielded road casks, the RH-TRU 72B and the CNS 10-160B. Washington TRU Solutions (WTS), the WIPP Management and Operation Contractor (MOC), conducted a performance dry run (PDR), beginning August 19, 2002 and successfully completed it on August 24, 2002. The PDR demonstrated that the RHTRU waste handling system works as designed and demonstrated the handling process for each cask, including underground disposal. The purpose of the PDR was to develop and implement a plan that would define in general terms how the WIPP RH-TRU waste handling process would be conducted and evaluated. The PDR demonstrated WIPP operations and support activities required to dispose of RH-TRU waste in the WIPP underground.

  14. 78 FR 13747 - Railroad Safety: Advisory Notice Related to Railroad Accidents in Vicinity of Underground Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... Federal Railroad Administration Railroad Safety: Advisory Notice Related to Railroad Accidents in Vicinity of Underground Pipelines AGENCY: Federal Railroad Administration (FRA), Department of Transportation... Materials Safety Administration (PHMSA) issued an advisory bulletin in the Federal Register (77 FR...

  15. 76 FR 78335 - North Carolina & Virginia Railroad Company, LLC, Chesapeake & Albemarle Railroad Division-Lease...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... Surface Transportation Board North Carolina & Virginia Railroad Company, LLC, Chesapeake & Albemarle Railroad Division--Lease Amendment Exemption--Norfolk Southern Railway Company North Carolina & Virginia Railroad, LLC, Chesapeake & Albemarle Railroad Division (NCVR), a Class III carrier, has filed a...

  16. Justification for Continued Operation of the SRS Saltstone Facility (Z-Area)

    SciTech Connect

    Wagner, W.A.

    1999-01-20

    Saltstone Production and Disposal Facilities (Z-Area) are a part of the Defense Waste Processing Facilities (DWPF). Z-Area facilities are just one segment of an integrated waste management and disposal system located at the Savannah River Site (SRS). The bases for the Justification of Continuing Operations (JCO) of the Saltstone Production and Disposal Facilities (Z-Area) at SRS are provided.

  17. Railroading Powder River style: bigger investments and bigger trains

    SciTech Connect

    Buchsbaum, L.

    2007-07-15

    The Joint Line, co-owned and operated by Union Pacific and Burlington Norfolk Santa Fe (BNSF) railroads, carried a record 354 million tons of coal from Wyoming's Powder River Basin, on 15,000 to 17,000 ton trains. The average haul is almost 1,000 miles. Torrential rainfall and coal dust caused derailment and buckling problems in 2005. The article reports progress in repairing the track and expanding railroad capacity since then. Many are anxious about the railroad's ability to move ever increasing amounts of coal. 3 photos.

  18. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.

    SciTech Connect

    McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie

    2004-01-01

    Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks

  19. Quality assurance in the enriched uranium operations NDA facility

    SciTech Connect

    May, P.K.; Ceo, R.N.

    1997-11-01

    The Nondestructive Analysis (NDA) Facility at the Oak Ridge Y-12 Plant has characterized process wastes for Enriched Uranium Operations since 1978. Since that time, over 50,000 items have been analyzed. Analysis results are used to determine whether or not recovery of uranium from process wastes is economically feasible. Our instrument complement includes one large segmented gamma scanner (SGS), two smaller SGS, two solution assay systems (SAS), and Active Well Coincidence Counter (AWCC). The large SGS is used for analyzing High Efficiency Particulate Air (HEPA) filters ant 208-L drums filled with combustible contaminated waste. The smaller SGS are used to analyze 4-L containers of ash and leached residues. The SAS are used to analyze 125 ml bottles of aqueous or organic waste solutions that may contain uranium. The gamma-based NDA techniques are used to identify which process wastes can be discarded, and which must be recycled. The AWCC is used to analyze high-density materials which are not amenable to gamma-ray analysis. 1 ref., 4 figs.

  20. Developing operating procedures for a low-level radioactive waste disposal facility

    SciTech Connect

    Sutherland, A.A.; Miner, G.L.; Grahn, K.F.; Pollard, C.G.

    1993-10-01

    This document is intended to assist persons who are developing operating and emergency procedures for a low-level radioactive waste disposal facility. It provides 25 procedures that are considered to be relatively independent of the characteristics of a disposal facility site, the facility design, and operations at the facility. These generic procedures should form a good starting point for final procedures on their subjects for the disposal facility. In addition, this document provides 55 annotated outlines of other procedures that are common to disposal facilities. The annotated outlines are meant as checklists to assist the developer of new procedures.

  1. The Wallops Flight Facility Rapid Response Range Operations Initiative

    NASA Technical Reports Server (NTRS)

    Underwood, Bruce E.; Kremer, Steven E.

    2004-01-01

    While the dominant focus on short response missions has appropriately centered on the launch vehicle and spacecraft, often overlooked or afterthought phases of these missions have been launch site operations and the activities of launch range organizations. Throughout the history of organized spaceflight, launch ranges have been the bane of flight programs as the source of expense, schedule delays, and seemingly endless requirements. Launch Ranges provide three basic functions: (1) provide an appropriate geographical location to meet orbital other mission trajectory requirements, (2) provide project services such as processing facilities, launch complexes, tracking and data services, and expendable products, and (3) assure safety and property protection to participating personnel and third-parties. The challenge with which launch site authorities continuously struggle, is the inherent conflict arising from projects whose singular concern is execution of their mission, and the range s need to support numerous simultaneous customers. So, while tasks carried out by a launch range committed to a single mission pale in comparison to efforts of a launch vehicle or spacecraft provider and could normally be carried out in a matter of weeks, major launch sites have dozens of active projects separate sponsoring organizations. Accommodating the numerous tasks associated with each mission, when hardware failures, weather, maintenance requirements, and other factors constantly conspire against the range resource schedulers, make the launch range as significant an impediment to responsive missions as launch vehicles and their cargo. The obvious solution to the launch site challenge was implemented years ago when the Department of Defense simply established dedicated infrastructure and personnel to dedicated missions, namely an Inter Continental Ballistic Missile. This however proves to be prohibitively expensive for all but the most urgent of applications. So the challenge

  2. Railroad management planning. (Latest citations from the NTIS database). Published Search

    SciTech Connect

    Not Available

    1993-01-01

    The bibliography contains citations concerning railroad management techniques and their impact on operations. Topics include freight statistics, impacts on communities, and yard operations. Forecasts of future trends and government policies regarding railroad operations are also discussed. (Contains a minimum of 76 citations and includes a subject term index and title list.)

  3. A probabilistic risk assessment of the LLNL Plutonium Facility`s evaluation basis fire operational accident. Revision 1

    SciTech Connect

    Brumburgh, G. P.

    1995-02-27

    The Lawrence Livermore National Laboratory (LLNL) Plutonium Facility conducts numerous programmatic activities involving plutonium to include device fabrication, development of improved and/or unique fabrication techniques, metallurgy research, and laser isotope separation. A Safety Analysis Report (SAR) for the building 332 Plutonium Facility was completed in July 1994 to address operational safety and acceptable risk to employees, the public, government property, and the environmental. This paper outlines the PRA analysis of the Evaluation Basis Fire (EBF) operational accident. The EBF postulates the worst-case programmatic impact event for the Plutonium Facility.

  4. 76 FR 13272 - Columbia & Cowlitz Railway, LLC-Corporate Family Transaction Exemption-Patriot Woods Railroad, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-10

    ... Surface Transportation Board Columbia & Cowlitz Railway, LLC--Corporate Family Transaction Exemption--Patriot Woods Railroad, LLC Columbia & Cowlitz Railway, LLC (CLC) and Patriot Woods Railroad, LLC (Woods... corporate family. CLC seeks to lease and operate all of Woods' lines of railroad consisting of...

  5. High Performance Computing Facility Operational Assessment, FY 2011 Oak Ridge Leadership Computing Facility

    SciTech Connect

    Baker, Ann E; Bland, Arthur S Buddy; Hack, James J; Barker, Ashley D; Boudwin, Kathlyn J.; Kendall, Ricky A; Messer, Bronson; Rogers, James H; Shipman, Galen M; Wells, Jack C; White, Julia C

    2011-08-01

    Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) continues to deliver the most powerful resources in the U.S. for open science. At 2.33 petaflops peak performance, the Cray XT Jaguar delivered more than 1.5 billion core hours in calendar year (CY) 2010 to researchers around the world for computational simulations relevant to national and energy security; advancing the frontiers of knowledge in physical sciences and areas of biological, medical, environmental, and computer sciences; and providing world-class research facilities for the nation's science enterprise. Scientific achievements by OLCF users range from collaboration with university experimentalists to produce a working supercapacitor that uses atom-thick sheets of carbon materials to finely determining the resolution requirements for simulations of coal gasifiers and their components, thus laying the foundation for development of commercial-scale gasifiers. OLCF users are pushing the boundaries with software applications sustaining more than one petaflop of performance in the quest to illuminate the fundamental nature of electronic devices. Other teams of researchers are working to resolve predictive capabilities of climate models, to refine and validate genome sequencing, and to explore the most fundamental materials in nature - quarks and gluons - and their unique properties. Details of these scientific endeavors - not possible without access to leadership-class computing resources - are detailed in Section 4 of this report and in the INCITE in Review. Effective operations of the OLCF play a key role in the scientific missions and accomplishments of its users. This Operational Assessment Report (OAR) will delineate the policies, procedures, and innovations implemented by the OLCF to continue delivering a petaflop-scale resource for cutting-edge research. The 2010 operational assessment of the OLCF yielded recommendations that have been addressed (Reference Section 1) and where

  6. 75 FR 20038 - Railroad Safety Technology Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Federal Railroad Administration Railroad Safety Technology Grant Program AGENCY: Federal Railroad Administration, Department of Transportation. ACTION: Notice of Funds Availability, Railroad Safety Technology... (Volume 75, Number 59; March 29, 2010) for the Railroad Safety Technology Program, in the...

  7. 14 CFR 121.607 - Communication and navigation facilities: Domestic and flag operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...: Domestic and flag operations. 121.607 Section 121.607 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.607 Communication and navigation facilities: Domestic and flag operations....

  8. 14 CFR 121.607 - Communication and navigation facilities: Domestic and flag operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...: Domestic and flag operations. 121.607 Section 121.607 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.607 Communication and navigation facilities: Domestic and flag operations....

  9. 14 CFR 121.607 - Communication and navigation facilities: Domestic and flag operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...: Domestic and flag operations. 121.607 Section 121.607 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.607 Communication and navigation facilities: Domestic and flag operations....

  10. 14 CFR 121.607 - Communication and navigation facilities: Domestic and flag operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...: Domestic and flag operations. 121.607 Section 121.607 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.607 Communication and navigation facilities: Domestic and flag operations....

  11. 14 CFR 121.607 - Communication and navigation facilities: Domestic and flag operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...: Domestic and flag operations. 121.607 Section 121.607 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.607 Communication and navigation facilities: Domestic and flag operations....

  12. Students Speak With Angela Bauer, Facilities Operations and Maintenance Group Lead

    NASA Video Gallery

    From NASA’s International Space Station Mission Control Center Angela Bauer, Facilities Operations and Maintenance Group lead in the Mission Operations Directorate at Johnson Space Center, partic...

  13. Lunar Transportation Facilities and Operations Study, option 1

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Throughout the Option I period of the Lunar Transportation Facilities and Operations Study (LTFOS), McDonnell Douglas Space Systems Company - Kennedy Space Center (MDSSC-KSC) provided support to both the Planetary Surface Systems (PSS) Office at the National Aeronautics and Space Administration (NASA) at the Johnson Space Center and to the Flight and Ground Systems Projects Office (Payload Projects Management) at the Kennedy Space Center. The primary objective of the Option I phase of the study was to assist the above NASA centers in developing Space Exploration Initiative (SEI) concepts. MDSSC-KSC conducted three analyses which provided launch and landing detail to the proposed exploration concepts. One analysis, the Lunar Ejecta Assessment, was conducted to determine the effects of launch and landing a vehicle in a dusty environment. A second analysis, the Thermal/Micrometeoroid Protection Trade Study, was refined to determine the impacts that Reference Architecture Option 5A would have on thermal/micrometeoroid protection approaches. The third analysis, the Centaur Prelaunch Procedure Analysis, used a Centaur prelaunch test and checkout flow to identify key considerations that would be important if a Lunar Excursion Vehicle (LEV) was to use an expander cycle liquid oxygen-liquid hydrogen engine. Several 'quick look' assessments were also conducted. One quick look assessment, the Storable Propellant Quick Look Assessment, was conducted to identify design considerations that should be made if storable propellants were to be used instead of liquid oxygen and liquid hydrogen. The LEV Servicer Maintenance Analysis provided an early look at the effort required to maintain an LEV Servicer on the lunar surface. Also, support was provided to the PSS Logistics Manager to develop initial LEV Servicer cost inputs. Consideration was given to the advanced development that must be provided to accomplish a lunar and/or Mars mission. MDSS-KSC also provided support to both MASE

  14. Umatilla Hatchery Satellite Facilities; Operations and Maintenance, Annual Report 2001.

    SciTech Connect

    Rowan, Gerald

    2003-05-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem, Thornhollow and Pendleton satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam and South Fork Walla Walla facilities are used for holding and spawning chinook salmon. In some years, Three Mile Dam may also be used for holding and spawning coho salmon. In the spring of 2002, summer steelhead were acclimated and released at Bonifer Pond (54,917), Minthorn Springs (47,521), and Pendleton (54,366). Yearling coho (1,621,857) were also acclimated and released at Pendleton. Yearling spring chinook salmon (876,121) were acclimated and released at Imeques C-mem-ini-kem. At Thornhollow, 520,564 yearling fall chinook and 307,194 subyearling fall chinook were acclimated. In addition, 104,908 spring chinook were transported to Imeques C-mem-ini-kem in November for release in the spring of 2003. CTUIR and ODFW personnel monitored the progress of outmigration for juvenile releases at the Westland Canal juvenile facility. Nearly all juveniles released in the spring migrated downstream prior to the trap being opened in early July. A total of 100 unmarked and 10 marked summer steelhead were collected for broodstock at Three Mile Dam from September 21, 2001, through April 2, 2002. An estimated 180,955 green eggs were taken from 36 females and were transferred to Umatilla Hatchery for incubation and rearing. A total of 560 adult and 26 jack spring chinook salmon were collected for broodstock at Three Mile Dam from April 22 through June 12, 2002

  15. 39 CFR 241.3 - Discontinuance of USPS-operated retail facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Discontinuance of USPS-operated retail facilities. 241.3 Section 241.3 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION ESTABLISHMENT CLASSIFICATION, AND DISCONTINUANCE § 241.3 Discontinuance of USPS-operated retail facilities. (a) Introduction—(1) Coverage. (i)...

  16. 39 CFR 241.3 - Discontinuance of USPS-operated retail facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Discontinuance of USPS-operated retail facilities. 241.3 Section 241.3 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION ESTABLISHMENT CLASSIFICATION, AND DISCONTINUANCE § 241.3 Discontinuance of USPS-operated retail facilities. (a) Introduction—(1) Coverage. (i)...

  17. 39 CFR 241.3 - Discontinuance of USPS-operated retail facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Discontinuance of USPS-operated retail facilities. 241.3 Section 241.3 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION ESTABLISHMENT CLASSIFICATION, AND DISCONTINUANCE § 241.3 Discontinuance of USPS-operated retail facilities. (a) Introduction—(1) Coverage. (i)...

  18. The Pajarito Site operating procedures for the Los Alamos Critical Experiments Facility

    SciTech Connect

    Malenfant, R.E.

    1991-12-01

    Operating procedures consistent with DOE Order 5480.6, and the American National Standard Safety Guide for the Performance of Critical Experiments are defined for the Los Alamos Critical Experiments Facility (LACEF) of the Los Alamos National Laboratory. These operating procedures supersede and update those previously published in 1983 and apply to any criticality experiment performed at the facility. 11 refs.

  19. Battery test facility hardware, software, and system operation

    NASA Astrophysics Data System (ADS)

    Rodriguez, G. P.

    1991-09-01

    Division 2525 Battery Test Laboratory is a fully automated battery testing facility used in evaluating various battery technologies. The results of these tests are used to verify developers' claims, characterize prototypes, and assist in identifying the strengths and weaknesses of each technology. The test facility consists of a central computer and nine remote computer controlled battery test systems. Data acquired during the battery testing process is sent to the central computer system. The test data is then stored in a large database for future analysis. The central computer system is also used in configuring battery tests. These test configurations are then sent to their appropriate remote battery test sites. The battery test facility can perform a variety of battery tests, which include the following: life cycle testing; parametric testing at various temperature levels, cutoff parameters, charge rates, and discharge rates; constant power testing at various power levels; peak power testing at various state-of-charge levels; simplified federal urban driving schedule tests (SFUDS79). The battery test facility is capable of charging a battery either by constant current, constant voltage, step current levels, or any combination of them. Discharge cycles can be by constant current, constant resistance, constant power, step current levels, or also any combination of them. The battery test facility has been configured to provide the flexibility to evaluate a large variety of battery technologies. These technologies include lead-acid, sodium/sulfur, zinc/bromine, nickel/hydrogen, aluminum/air, and nickel/cadmium batteries.

  20. Battery test facility hardware, software, and system operation

    SciTech Connect

    Rodriguez, G.P.

    1991-09-01

    Division 2525 Battery Test Laboratory is a fully automated battery testing facility used in evaluating various battery technologies. The results of these tests are used to verify developers' claims, characterize prototypes, and assist in identifying the strengths and weaknesses of each technology. The Test Facility consists of a central computer and nine remote computer controlled battery test systems. Data acquired during the battery testing process is sent to the central computer system. The test data is then stored in a large database for future analysis. The central computer system is also used in configuring battery tests. These test configurations are then sent to their appropriate remote battery test sites. The Battery Test Facility can perform a variety of battery tests, which include the following: Life Cycle Testing; Parametric Testing at various temperature levels, cutoff parameters, charge rates, and discharge rates; Constant Power Testing at various power levels; Peak Power Testing at various State-of-Charge levels; Simplified Federal Urban Driving Schedule Tests (SFUDS79). The Battery Test Facility is capable of charging a battery either by constant current, constant voltage, step current levels, or any combination of them. Discharge cycles can be by constant current, constant resistance, constant power, step current levels, or also any combination of them. The Battery Test Facility has been configured to provide the flexibility to evaluate a large variety of battery technologies. These technologies include Lead-Acid, Sodium/Sulfur, Zinc/Bromine, Nickel/Hydrogen, Aluminum/Air, and Nickel/Cadmium batteries.

  1. Battery test facility hardware, software, and system operation

    SciTech Connect

    Rodriguez, G.P.

    1991-09-01

    Division 2525 Battery Test Laboratory is a fully automated battery testing facility used in evaluating various battery technologies. The results of these tests are used to verify developers` claims, characterize prototypes, and assist in identifying the strengths and weaknesses of each technology. The Test Facility consists of a central computer and nine remote computer controlled battery test systems. Data acquired during the battery testing process is sent to the central computer system. The test data is then stored in a large database for future analysis. The central computer system is also used in configuring battery tests. These test configurations are then sent to their appropriate remote battery test sites. The Battery Test Facility can perform a variety of battery tests, which include the following: Life Cycle Testing; Parametric Testing at various temperature levels, cutoff parameters, charge rates, and discharge rates; Constant Power Testing at various power levels; Peak Power Testing at various State-of-Charge levels; Simplified Federal Urban Driving Schedule Tests (SFUDS79). The Battery Test Facility is capable of charging a battery either by constant current, constant voltage, step current levels, or any combination of them. Discharge cycles can be by constant current, constant resistance, constant power, step current levels, or also any combination of them. The Battery Test Facility has been configured to provide the flexibility to evaluate a large variety of battery technologies. These technologies include Lead-Acid, Sodium/Sulfur, Zinc/Bromine, Nickel/Hydrogen, Aluminum/Air, and Nickel/Cadmium batteries.

  2. The potential for LNG as a railroad fuel in the U.S.

    SciTech Connect

    Fritz, S.G.

    2000-01-01

    Freight railroad operations in the US represent a substantial opportunity for liquefied natural gas (LNG) to displace diesel fuel. With the promise of achieving an overwhelming economic advantage over diesel fuel, this paper presents some discussion to the question, ``Why is the application of LNG for railroad use in the US moving so slowly?'' A brief overview of the freight railroad operations in the US is given, along with a summary of several railroad LNG demonstration projects. US Environmental Protection Agency and California Air Resources Board exhaust emission regulations may cause the railroad industry to move from small-scale LNG demonstration projects to using LNG as a primary freight railroad transportation fuel in selected regions or route-specific applications.

  3. Coming of the Railroad, Unit V.

    ERIC Educational Resources Information Center

    Robinson, Terry

    Designed for elementary school students, this unit on the coming of the railroad in Wyoming provides concepts, activities, resource lists, and maps. Concepts stress the coming of the railroad in 1867-69, routes which were considered, towns owing their origin to the railroad, the railroad ownership of southern Wyoming, and the relationship between…

  4. Big Dee - a flexible facility operating near breakeven conditions

    SciTech Connect

    Luxon, J.L.; Davis, L.G.

    1985-03-01

    The Doublet III tokamak facility is presently undergoing an upgrade to Big Dee, a device projected to be capable of producing plasmas with parameters approaching breakeven conditions, albeit in hydrogen plasmas. The goal of the upgrade has been to develop a facility capable of studying confinement and beta in non-circular discharges at parameters near breakeven conditions while maintaining the flexibility and accessibility necessary to allow a wide range of problems to be addressed. The upgrade replaces the vacuum vessel and outermost plasma shaping coils allowing higher plasma currents and improved access.

  5. Big Dee - A flexible facility operating near breakeven conditions

    SciTech Connect

    Luxon, J.L.; Davis, L.G.

    1985-07-01

    The Doublet III tokamak facility is presently undergoing an upgrade to Big Dee, a device projected to be capable of producing plasmas with parameters approaching breakeven conditions, albeit in hydrogen plasmas. The goal of the upgrade has been to develop a facility capable of studying confinement and beta in non-circular discharges at parameters near breakeven conditions while maintaining the flexibility and accessibility necessary to allow a wide range of problems to be addressed. The upgrade replaces the vacuum vessel and outermost plasma shaping coils allowing higher plasma currents and improved access.

  6. The operation of the Tokamak Fusion Test Reactor Tritium Facility

    SciTech Connect

    Gentile, C.A.; LaMarche, P.H.; Anderson, J.L.

    1995-07-01

    The TFTR tritium operations staff has successfully received, stored, handled, and processed over five hundred thousand curies of tritium for the purpose of supporting D-T (Deuterium-Tritium) operations at TFTR. Tritium operations personnel nominally provide continuous round the clock coverage (24 hours/day, 7 days/week) in shift complements consisting of I supervisor and 3 operators. Tritium Shift Supervisors and operators are required to have 5 years of operational experience in either the nuclear or chemical industry and to become certified for their positions. The certification program provides formal instruction, as well as on the job training. The certification process requires 4 to 6 months to complete, which includes an oral board lasting up to 4 hours at which time the candidate is tested on their knowledge of Tritium Technology and TFTR Tritium systems. Once an operator is certified, the training process continues with scheduled training weeks occurring once every 5 weeks. During D-T operations at TFTR the operators must evacuate the tritium area due to direct radiation from TFTR D-T pulses. During `` time operators maintain cognizance over tritium systems via a real time TV camera system. Operators are able to gain access to the Tritium area between TFTR D-T pulses, but have been excluded from die tritium area during D-T pulsing for periods up to 30 minutes. Tritium operators are responsible for delivering tritium gas to TFRR as well as processing plasma exhaust gases which lead to the deposition of tritium oxide on disposable molecular sieve beds (DMSB). Once a DMSB is loaded, the operations staff remove the expended DMSB, and replace it with a new DMSB container. The TFIR tritium system is operated via detailed procedures which require operator sign off for system manipulation. There are >300 procedures controlling the operation of the tritium systems.

  7. High Performance Computing Facility Operational Assessment, FY 2010 Oak Ridge Leadership Computing Facility

    SciTech Connect

    Bland, Arthur S Buddy; Hack, James J; Baker, Ann E; Barker, Ashley D; Boudwin, Kathlyn J.; Kendall, Ricky A; Messer, Bronson; Rogers, James H; Shipman, Galen M; White, Julia C

    2010-08-01

    Oak Ridge National Laboratory's (ORNL's) Cray XT5 supercomputer, Jaguar, kicked off the era of petascale scientific computing in 2008 with applications that sustained more than a thousand trillion floating point calculations per second - or 1 petaflop. Jaguar continues to grow even more powerful as it helps researchers broaden the boundaries of knowledge in virtually every domain of computational science, including weather and climate, nuclear energy, geosciences, combustion, bioenergy, fusion, and materials science. Their insights promise to broaden our knowledge in areas that are vitally important to the Department of Energy (DOE) and the nation as a whole, particularly energy assurance and climate change. The science of the 21st century, however, will demand further revolutions in computing, supercomputers capable of a million trillion calculations a second - 1 exaflop - and beyond. These systems will allow investigators to continue attacking global challenges through modeling and simulation and to unravel longstanding scientific questions. Creating such systems will also require new approaches to daunting challenges. High-performance systems of the future will need to be codesigned for scientific and engineering applications with best-in-class communications networks and data-management infrastructures and teams of skilled researchers able to take full advantage of these new resources. The Oak Ridge Leadership Computing Facility (OLCF) provides the nation's most powerful open resource for capability computing, with a sustainable path that will maintain and extend national leadership for DOE's Office of Science (SC). The OLCF has engaged a world-class team to support petascale science and to take a dramatic step forward, fielding new capabilities for high-end science. This report highlights the successful delivery and operation of a petascale system and shows how the OLCF fosters application development teams, developing cutting-edge tools and resources for next

  8. 3. NORTH ELEVATION OF THE HOT BAY, SHOWING RAILROAD TRACKS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. NORTH ELEVATION OF THE HOT BAY, SHOWING RAILROAD TRACKS LEADING TO THE MASSIVE STEEL-LINED CONCRETE ENTRANCE DOOR. PART OF THE INTRICATE HVAC SYSTEM IS WEST (RIGHT) OF THE DOOR. - Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV

  9. 14 CFR 121.99 - Communications facilities-domestic and flag operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communications facilities-domestic and flag operations. 121.99 Section 121.99 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS:...

  10. Operational experience on the Brookhaven National Laboratory Accelerator Test Facility

    SciTech Connect

    Batchelor, K.; Babzien, M.; Ben-Zvi, I.

    1994-09-01

    Brookhaven National Laboratory Accelerator Test Facility is a laser-electron linear accelerator complex designed to provide high brightness beams for testing of advanced acceleration concepts and high power pulsed photon sources. Results of electron beam parameters attained during the commissioning of the nominally 45 MeV energy machine are presented.

  11. 14 CFR 121.122 - Communications facilities-supplemental operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... two engines must show that a two-way radio communication system or other means of communication... than two engines must provide voice communications for ETOPS where voice communication facilities are... or are of such poor quality that voice communication is not possible, another communication...

  12. 14 CFR 121.122 - Communications facilities-supplemental operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... two engines must show that a two-way radio communication system or other means of communication... than two engines must provide voice communications for ETOPS where voice communication facilities are... or are of such poor quality that voice communication is not possible, another communication...

  13. 14 CFR 121.122 - Communications facilities-supplemental operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... two engines must show that a two-way radio communication system or other means of communication... than two engines must provide voice communications for ETOPS where voice communication facilities are... or are of such poor quality that voice communication is not possible, another communication...

  14. 75 FR 61835 - Jackson & Lansing Railroad Company-Trackage Rights Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Surface Transportation Board Jackson & Lansing Railroad Company--Trackage Rights Exemption-- Norfolk Southern Railway Company Pursuant to a written Assignment of Trackage Rights and Other Joint Facility Agreements (Trackage Agreement) dated September 16, 2010, Norfolk Southern Railway Company (NSR) has...

  15. Activities and operations of Argonne's Advanced Computing Research Facility: February 1990 through April 1991

    SciTech Connect

    Pieper, G.W.

    1991-05-01

    This report reviews the activities and operations of the Advanced Computing Research Facility (ACRF) from February 1990 through April 1991. The ACRF is operated by the Mathematics and Computer Science Division at Argonne National Laboratory. The facility's principal objective is to foster research in parallel computing. Toward this objective, the ACRF operates experimental advanced computers, supports investigations in parallel computing, and sponsors technology transfer efforts to industry and academia. 5 refs., 1 fig.

  16. Activities and operations of the Advanced Computing Research Facility, January 1989--January 1990

    SciTech Connect

    Pieper, G.W.

    1990-02-01

    This report reviews the activities and operations of the Advanced Computing Research Facility (ACRF) for the period January 1, 1989, through January 31, 1990. The ACRF is operated by the Mathematics and Computer Science Division at Argonne National Laboratory. The facility's principal objective is to foster research in parallel computing. Toward this objective, the ACRF continues to operate experimental advanced computers and to sponsor new technology transfer efforts and new research projects. 4 refs., 8 figs.

  17. Waste Examination Assay Facility operations: TRU waste certification

    SciTech Connect

    Schultz, F.J.; Caylor, B.A.; Coffey, D.E.; Phoenix, L.B.

    1987-01-01

    The ORNL Waste Examination Assay Facility (WEAF) was established to nondestructively assay (NDA) transuranic (TRU) waste generated at Oak Ridge National Laboratory (ORNL). The present facility charter encompasses the NDA and nondestructive examination (NDE) of both TRU and low-level wastes (LLW). Presently, equipment includes a Neutron Assay System (NAS), a Segmented Gamma Scanner (SGS), a drum-sized Real-Time Radiography (RTR) system, and a Neutron Slab Detector (NSD). The first three instruments are computer interfaced. Approximately 2300 TRU waste drums have been assayed with the NAS and the SGS. Another 3000 TRU and LLW drums have been examined with the RTR unit. Computer data bases have been developed to collate the large amount of data generated during the assays and examinations. 6 refs., 1 tab.

  18. Railroad Valley, Nevada

    NASA Technical Reports Server (NTRS)

    2001-01-01

    Information from images of Railroad Valley, Nevada captured on August 17,2001 by the Advanced Spaceborne Thermal Emission and Reflection Radiometer(ASTER) may provide a powerful tool for monitoring crop health and maintenance procedures.

    These images cover an area of north central Nevada. The top image shows irrigated fields, with healthy vegetation in red. The middle image highlights the amount of vegetation. The color code shows highest vegetation content in red, orange, yellow, green, blue, and purple and the lowest in black. The final image is a thermal infrared channel, with warmer temperatures in white and colder in black.

    In the thermal image, the northernmost and westernmost fields are markedly colder on their northwest areas, even though no differences are seen in the visible image or the second, Vegetation Index image. This can be attributed to the presence of excess water, which can lead to crop damage.

    The Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER)is an imaging instrument that is flying on Terra, a satellite launched in December 1999 as part of NASA's Earth Observing System (EOS). The instrument is being used to obtain detailed maps of land surface temperature, emissivity, reflectance and elevation. The Earth Observing System (EOS) platforms are part of NASA's Earth Science Enterprise, whose goal is to obtain a better understanding of the interactions between the biosphere, hydrosphere, lithosphere and atmosphere.

    NASA's Jet Propulsion Laboratory is a division of the California Institute of Technology, Pasadena.

  19. 75 FR 71545 - Changes to NARA Facilities' Hours of Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... Register (75 FR 54543) for a 60-day public comment period. This proposed rule changed NARA's regulations... Central Research Room are posted at http://www.archives.gov . The exhibit areas' hours of operation are... of Operation AGENCY: National Archives and Records Administration. ACTION: Final rule. SUMMARY:...

  20. Overview of the DOE Waste Facilities Operations Robotics Technology Development Program

    SciTech Connect

    Ward, C.R.

    1992-01-01

    The Department of Energy's Office of Technology Development has initiated a Robotics Technology Development Program that includes technology aimed at DOE Waste Facilities Operations (WFO). Much of this technology may also be applicable to waste facilities outside of DOE and will be available for use. This is a team effort of several DOE Laboratories and Sites. The WFO team includes the Savannah River Technology Center, Sandia National Laboratories, Oak Ridge National Laboratory, Idaho National Engineering Laboratory, Lawrence Livermore National Laboratory, the Fernald Environmental Management Project and the Waste Isolation Pilot Plant. DOE has waste facilities currently in operation at many sites and many more of these facilities are planned as part of the DOE site cleanup effort. As the cleanup continues, existing facilities and new facilities will be taxed with an increasing volume of waste, more varied waste streams, more complex processing requirements, more challenging waste characteristics, more stringent waste form criteria, and stricter regulations. The WFO Robotics Technology Development Program will address these challenges by developing robotic systems technology that will be safer, better, faster, and cheaper than existing technology. The goals of this technology development are to remove humans from both radiologically and physically dangerous environments in waste facilities, improve the quality and quality assurance of operations, increase the throughput of operations, increase the flexibility of facilities, reduce the manpower requirements for operations and meet federal, state and local regulations. There are four areas within the WFO program; the Mixed Waste Treatment Project, Stored Waste, the Waste Isolation Pilot Plant and Remote Size Reduction.

  1. EVALUATION OF BIOAEROSOLS ASSOCIATED WITH CONCENTRATED ANIMAL FACILITY OPERATIONS (CAFOS)

    EPA Science Inventory

    Certain illnesses have been associated with workers involved with CAFO's, however exposure at the property line has not been determined. The USEPA will monitor bioaerosols during CAFO operation to determine if specific bioaerosol components are pathogenic.

  2. Operator-machine interface at a large laser-fusion facility

    SciTech Connect

    Sutton, J.G.; Howell, J.A.

    1982-01-01

    The operator-machine interface at the Antares Laser Facility provides the operator with a means of controlling the laser system and obtaining operational and performance information. The goal of this interface is to provide an operator with access to the control system in a comfortable way, and to facilitate meeting operational requirements. We describe the philosophy and requirements behind this interface, the hardware used in building it, and the software environment.

  3. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., Infrastructure, and Equipment for Military Operations. 252.246-7004 Section 252.246-7004 Federal Acquisition..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause: Safety of Facilities, Infrastructure, and Equipment for Military Operations (OCT 2010) (a)...

  4. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., Infrastructure, and Equipment for Military Operations. 252.246-7004 Section 252.246-7004 Federal Acquisition..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause: Safety of Facilities, Infrastructure, and Equipment for Military Operations (OCT 2010) (a)...

  5. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  6. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., Infrastructure, and Equipment for Military Operations. 252.246-7004 Section 252.246-7004 Federal Acquisition..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause: SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY OPERATIONS (OCT 2010) (a)...

  7. Microbiology operations and facilities aboard restructured Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis A.; Mishra, S. K.; Pierson, Duane L.

    1992-01-01

    With the restructure and funding changes for Space Station Freedom, the Environmental Health System (EHS)/Microbiology Subsystem revised its scheduling and operational requirements for component hardware. The function of the Microbiology Subsystem is to monitor the environmental quality of air, water, and internal surfaces and, in part, crew health on board Space Station. Its critical role shall be the identification of microbial contaminants in the environment that may cause system degradation, produce unsanitary or pathogenic conditions, or reduce crew and mission effectiveness. EHS/Microbiology operations and equipment shall be introduced in concert with a phased assembly sequence, from Man Tended Capability (MTC) through Permanently Manned Capability (PMC). Effective Microbiology operations and subsystem components will assure a safe, habitable, and useful spacecraft environment for life sciences research and long-term manned exploration.

  8. Operational experience from a large EPICS-based accelerator facility

    SciTech Connect

    Ciarlette, D.J.; Gerig, R.

    1995-12-31

    The Advanced Photon Source (APS) at Argonne National Laboratory is a third-generation x-ray light source which uses the Experimental Physics and Industrial Control System (EPICS) to operate its linear accelerator, positron accumulator ring, booster synchrotron, and storage ring equipment. EPICS has been used at the APS since the beginning of installation and commissioning. Currently, EPICS controls approximately 100 VME crates containing over 100,000 process variables. With this complexity, the APS has had to review some of the methods originally employed and make changes as necessary. In addition, due to commissioning and operational needs, higher-level operator software needed to be created. EPICS has been flexible enough to allow this.

  9. 78 FR 59754 - Notice of Application for Approval of Railroad Safety Program Plan and Product Safety Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... published on April 11, 2000 (65 FR 19477). Robert C. Lauby, Deputy Associate Administrator for Regulatory... railroad productivity and significantly improving the safety of train operations, roadway workers,...

  10. 40 CFR 121.26 - Inspection of facility or activity before operation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Inspection of facility or activity... (CONTINUED) WATER PROGRAMS STATE CERTIFICATION OF ACTIVITIES REQUIRING A FEDERAL LICENSE OR PERMIT Certification by the Administrator § 121.26 Inspection of facility or activity before operation. Where...

  11. 40 CFR 121.26 - Inspection of facility or activity before operation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Inspection of facility or activity... (CONTINUED) WATER PROGRAMS STATE CERTIFICATION OF ACTIVITIES REQUIRING A FEDERAL LICENSE OR PERMIT Certification by the Administrator § 121.26 Inspection of facility or activity before operation. Where...

  12. 40 CFR 121.26 - Inspection of facility or activity before operation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Inspection of facility or activity... (CONTINUED) WATER PROGRAMS STATE CERTIFICATION OF ACTIVITIES REQUIRING A FEDERAL LICENSE OR PERMIT Certification by the Administrator § 121.26 Inspection of facility or activity before operation. Where...

  13. 40 CFR 121.26 - Inspection of facility or activity before operation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Inspection of facility or activity... (CONTINUED) WATER PROGRAMS STATE CERTIFICATION OF ACTIVITIES REQUIRING A FEDERAL LICENSE OR PERMIT Certification by the Administrator § 121.26 Inspection of facility or activity before operation. Where...

  14. 40 CFR 121.26 - Inspection of facility or activity before operation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Inspection of facility or activity... (CONTINUED) WATER PROGRAMS STATE CERTIFICATION OF ACTIVITIES REQUIRING A FEDERAL LICENSE OR PERMIT Certification by the Administrator § 121.26 Inspection of facility or activity before operation. Where...

  15. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and...

  16. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and...

  17. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and...

  18. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and...

  19. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and...

  20. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment...

  1. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment...

  2. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment...

  3. 26 CFR 1.132-7 - Employer-operated eating facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... employer contracts with another to operate an eating facility for its employees, the facility is considered...-for-profit hospital system maintains cafeterias for the use of its employees and volunteers. Only the... cafeterias within the system furnish more free meals to volunteers than they serve paid meals to...

  4. Technology basis for the Liquid Effluent Retention Facility Operating Specifications. Revision 3

    SciTech Connect

    Johnson, P.G.

    1995-05-17

    The Liquid Effluent Retention Facility (LERF) consists of three retention basins, each with a nominal storage capacity of 6.5 million gallons. LERF serves as interim storage of 242-A Evaporator process condensate for treatment in the Effluent Treatment Facility. This document provides the technical basis for the LERF Operating Specifications, OSD-T-151-00029.

  5. MOBILE DRINKING WATER TREATMENT RESEARCH FACILITY FOR INORGANIC CONTAMINANTS REMOVAL: DESIGN, CONSTRUCTION, AND OPERATION

    EPA Science Inventory

    This report describes the field research capabilities of the 10-ft wide by 40-ft long transportable research facility and summarizes its design, construction, and operation. With an October 1981 replacement value of $182,000, the mobile facility contains a complete analytical lab...

  6. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment...

  7. Spent Nuclear Fuel (SNF) Project Cold Vacuum Drying (CVD) Facility Operations Manual

    SciTech Connect

    IRWIN, J.J.

    2000-02-03

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of the Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the spent nuclear fuel project (SNFP) Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  8. 76 FR 1644 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... December 28, 2010 (75 FR 81667). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process...

  9. 75 FR 54390 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    ... August 24, 2010 (75 FR 52039). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process...

  10. 76 FR 9821 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... COMMISSION Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No... involves no significant hazards consideration, notwithstanding the pendency before the Commission of a... on February 8, 2011 (76 FR 6830). Notice of Consideration of Issuance of Amendments to...

  11. 75 FR 13786 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... March 9, 2010 (75 FR 10823). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process...

  12. 76 FR 21917 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... April 5, 2011 (76 FR 18801). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process...

  13. Spent Nuclear Fuel (SNF) Cold Vacuum Drying (CVD) Facility Operations Manual

    SciTech Connect

    IRWIN, J.J.

    1999-07-02

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-553, Spent Nuclear Fuel Project Final Safety Analysis Report Annex B--Cold Vacuum Drying Facility. The HNF-SD-SNF-DRD-002, 1999, Cold Vacuum Drying Facility Design Requirements, Rev. 4, and the CVDF Final Design Report. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence and references to the CVDF System Design Descriptions (SDDs). This manual has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  14. 75 FR 45010 - LRY, LLC D.B.A. Lake Railway-Lease and Operation Exemption-Union Pacific Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... milepost 508.0, near Perez, Cal. This transaction is related to Docket No. FD 35250, LRY, LLC D.B.A. Lake... published in the Federal Register on December 18, 2009 (74 FR 67,304-05) and became effective on January 1... Surface Transportation Board LRY, LLC D.B.A. Lake Railway--Lease and Operation Exemption-- Union...

  15. Safety of high speed ground transportation systems. High speed passenger trains in freight railroad corridors: Operations and safety considerations. Final report, September 1993-April 1994

    SciTech Connect

    Ullman, K.B.; Bing, A.J.

    1994-12-01

    This report presents the results of a study into some operations and technical issues likely to be encountered when planning for high-speed rail passenger service on corridors that presently carry freight or commuter traffic. The study starts with a review of corridors designated under Section 1010 of the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991, a potential future high-speed corridors. After a review of signal, train control and braking systems presently used in the United States and elsewhere, the study provides analyses of the safety and operations impacts of introducing high-speed rail service on the hypothetical corridor. The safety analysis established a safety performance target based on present intercity rail safety performance, and reviewed the need for and benefits from safety improvements for high speed operation. The operations analysis concentrated on the impacts on track capacity and train delays of introducing a high-speed rail service on three hypothetical existing corridors with different track layouts and signal systems.

  16. Educational Systems for Operators of Water Pollution Control Facilities.

    ERIC Educational Resources Information Center

    Austin, John H., Ed.; Kesler, John, Ed.

    Several of the articles from this conference concern current activities of federal, state, and municipal governments, of universities and community colleges, and of industry in wastewater treatment plant operator training. The rest of the articles deal with instructional technology, explaining different facets of it and showing how it may be…

  17. Maintenance & Operations Solutions: Meeting the Challenge of Improving School Facilities.

    ERIC Educational Resources Information Center

    Association of School Business Officials International, Reston, VA.

    This paper examines the impact current maintenance and operations (M&O) practices have on U.S. school performance and offers possible opportunities for improvement through the judicious use of technology and methodology. The paper also presents a regional comparative analysis of M&O costs across the country. A list of equipment and their service…

  18. Simulation Modeling of a Facility Layout in Operations Management Classes

    ERIC Educational Resources Information Center

    Yazici, Hulya Julie

    2006-01-01

    Teaching quantitative courses can be challenging. Similarly, layout modeling and lean production concepts can be difficult to grasp in an introductory OM (operations management) class. This article describes a simulation model developed in PROMODEL to facilitate the learning of layout modeling and lean manufacturing. Simulation allows for the…

  19. 75 FR 68861 - Miscellaneous Amendments to the Federal Railroad Administration's Accident/Incident Reporting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ... railroads and require reporting of occupational illnesses. 39 FR 43222, December 11, 1974. The third major... of railroad operations, 43 FR 10584, March 14, 1978. With respect to employee injury and illness... reporting regulations. 61 FR 30940, June 18, 1996; 61 FR 67477, December 23, 1996. This was the first...

  20. Facility Safety Plan B360 Complex Biohazardous Operations CMLS-412r0

    SciTech Connect

    Cooper, G

    2007-01-08

    This Addendum to the Facility Safety Plan (FSP) 360 Complex describes the safety requirements for the safe conduct of all biohazardous research operations in all buildings within the 360 complex program areas. These requirements include all the responsibilities and authorities of building personnel, operational hazards, and environmental concerns and their controls. In addition, this Addendum prescribes facility-specific training requirements and emergency controls, as well as maintenance and quality assurance requirements for ES&H-related building systems.

  1. Doses to railroad workers from shipments of radioactive materials

    SciTech Connect

    Fields, D.E.; Cottrell, W.D.

    1988-01-01

    Fissile and high-level radioactive wastes are currently transported over long distances by truck and by rail transportation systems. The primary form of fissile material is spent reactor fuel. Transportation operations within DOE are controlled through the Transportation Operations and Management System. DOE projected increases in the rate of shipments have generated concern by railroad companies that railroad workers may be exposed to levels of radiation sufficiently high that a radiation protection program may need to be implemented. To address railroad company concerns, the Health and Safety Research Division at Oak Ridge National Laboratory has estimated doses to railroad workers for two exposure scenarios that were constructed using worker activity data obtained from CSX Transportation for crew and maintenance workers. This characterization of railroad worker activity patterns includes a quantitative evaluation of the duration and rate of exposure. These duration and exposure rate values were evaluated using each of three exposure rate vs. distance models to generate exposure estimates. 14 refs., 1 tab.

  2. Method for loading coal into railroad cars

    SciTech Connect

    Moon, J.L.; Tompkins, J.C.

    1984-07-17

    A system for loading coal or other particles into railroad cars wherein every other railroad car is designated an EVEN railroad car and the remaining every other railroad cars are designated ODD railroad cars. Each EVEN railroad car is weighed after being filled with coal and before the initiation of the loading of coal into the next EVEN railroad car to determine a filled weight. The filled weight of each EVEN railroad car is compared to a predetermined control weight and, in response to this determination, the termination of the loading of coal into the next EVEN railroad car controllably is varied to bring the filled weight closer to control weight. In a like manner, each ODD railroad car is weighed after being filled with coal and before the initiation of the loading of coal into the next ODD railroad car to determine a filled weight. The filled weight of each ODD railroad car is compared to the predetermined control weight and, in response to this determination, the termination of the loading of coal into the next ODD railroad car controllably is varied to bring the filled weight closer to the control weight.

  3. Design data package and operating procedures for MSFC solar simulator test facility

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Design and operational data for the solar simulator test facility are reviewed. The primary goal of the facility is to evaluate the performance capacibility and worst case failure modes of collectors, which utilize either air or liquid transport media. The facility simulates environmental parameters such as solar radiation intensity, solar spectrum, collimation, uniformity, and solar attitude. The facility also simulates wind conditions of velocity and direction, solar system conditions imposed on the collector, collector fluid inlet temperature, and geometric factors of collector tilt and azimuth angles. Testing the simulator provides collector efficiency data, collector time constant, incident angle modifier data, and stagnation temperature values.

  4. Expanded operational capabilities of the Langley Mach 7 Scramjet test facility

    NASA Technical Reports Server (NTRS)

    Thomas, S. R.; Guy, R. W.

    1983-01-01

    An experimental research program conducted to expand the operational capabilities of the NASA Langley Mach 7 Scramjet Test Facility is described. Previous scramjet testing in this facility was limited to a single simulated flight condition of Mach 6.9 at an altitude of 115,300 ft. The arc heater research demonstrates the potential of the facility for scramjet testing at simulated flight conditions from Mach 4 (at altitudes from 77,000 to 114,000 ft) to Mach 7 (at latitudes from 108,000 to 149,000 ft). Arc heater electrical characteristics, operational problems, measurements of nitrogen oxide contaminants, and total-temperature profiles are discussed.

  5. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    SciTech Connect

    Not Available

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  6. 78 FR 26423 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... by the Engineering and System Safety Task Forces. This agenda is subject to change, including the... Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad...

  7. 5. GENERAL VIEW OF SOUTHERN PACIFIC RAILROAD BRIDGE, EAST APPROACH, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. GENERAL VIEW OF SOUTHERN PACIFIC RAILROAD BRIDGE, EAST APPROACH, ABUTMENT AND FIRST SET OF PIERS CROSSING RAILROAD LINE, LOOKING NORTH. - Southern Pacific Railroad Bridge, Spanning Rio Grande at Southern Pacific Railroad, El Paso, El Paso County, TX

  8. 8. VIEW OF SOUTHERN PACIFIC RAILROAD BRIDGE, CENTER PIER BETWEEN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. VIEW OF SOUTHERN PACIFIC RAILROAD BRIDGE, CENTER PIER BETWEEN U.S. AND RAILROAD, LOOKING NORTH. - Southern Pacific Railroad Bridge, Spanning Rio Grande at Southern Pacific Railroad, El Paso, El Paso County, TX

  9. 77 FR 64185 - Railroad Revenue Adequacy-2011 Determination

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-18

    ... Surface Transportation Board Railroad Revenue Adequacy--2011 Determination AGENCY: Surface Transportation... the 2011 revenue adequacy determinations for the Nation's Class I railroads. Two carriers, Norfolk Southern Combined Railroad Subsidiaries and Union Pacific Railroad Company, were found to be...

  10. 78 FR 62940 - Railroad Revenue Adequacy-2012 Determination

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... Surface Transportation Board Railroad Revenue Adequacy--2012 Determination AGENCY: Surface Transportation... announcing the 2012 revenue adequacy determinations for the Nation's Class I railroads. Two carriers, Norfolk Southern Combined Railroad Subsidiaries and Union Pacific Railroad Company, were found to be...

  11. 8. VIEW OF EL PASO AND SOUTHWESTERN RAILROAD BRIDGE, PIER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. VIEW OF EL PASO AND SOUTHWESTERN RAILROAD BRIDGE, PIER BETWEEN EAST APPROACH AND RAILROAD, LOOKING NORTH. - El Paso & Southwestern Railroad Rio Grande Bridge, Spanning Rio Grande at Southwestern Railroad, El Paso, El Paso County, TX

  12. 7. VIEW OF EL PASO AND SOUTHWESTERN RAILROAD BRIDGE, PIER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW OF EL PASO AND SOUTHWESTERN RAILROAD BRIDGE, PIER BETWEEN HIGHWAY AND RAILROAD, LOOKING NORTH. - El Paso & Southwestern Railroad Rio Grande Bridge, Spanning Rio Grande at Southwestern Railroad, El Paso, El Paso County, TX

  13. 4. GENERAL VIEW OF EL PASO AND SOUTHWESTERN RAILROAD BRIDGE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. GENERAL VIEW OF EL PASO AND SOUTHWESTERN RAILROAD BRIDGE, RAILROAD SPAN, LOOKING NORTH. - El Paso & Southwestern Railroad Rio Grande Bridge, Spanning Rio Grande at Southwestern Railroad, El Paso, El Paso County, TX

  14. 78 FR 62002 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-10

    ... 11, 1996 (61 FR 9740), for additional information about the RSAC. Issued in Washington, DC, on... Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad...

  15. 25 CFR 170.131 - How can a tribe find out more about designing and operating a toll facility?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... operating a toll facility? Information on designing and operating a toll highway, bridge or tunnel is available from the International Bridge, Tunnel and Turnpike Association. The Association publishes...

  16. 25 CFR 170.131 - How can a tribe find out more about designing and operating a toll facility?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... operating a toll facility? Information on designing and operating a toll highway, bridge or tunnel is available from the International Bridge, Tunnel and Turnpike Association. The Association publishes...

  17. 77 FR 72431 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ... Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border of the United... Presidential Permit to Operate and Maintain Pipeline Facilities on the Border of the United States and Canada... LPG Services, L.P. (``Plains LPG'') to operate and maintain pipeline facilities it has acquired at...

  18. 77 FR 72430 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ... Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border of the United... Presidential Permit to Operate and Maintain Pipeline Facilities on the Border of the United States and Canada... Services, L.P. (Plains LPG) to operate and maintain facilities it has acquired pertaining to six...

  19. Railroad safety program, volume 1

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Since 1981, the Federal Railroad Administration (FRA) has annually prepared a National Inspection Plan (NIP) whose purpose is to summarize regional efforts to improve railroad transportation safety. The research concluded on the following tasks including the problems, conclusions and recommendations associated with these tasks is summarized: (1) the preparation of the 1983 NIP, with recommended procedures for improving future NIPs; (2) the development of an outline for the 1984 NIP, including a methodology for the allocation of inspection resources and other specialized regional activities; (3) the management and development of the 1984 NIP; and (4) the development of an instruction manual to be used in the preparation of future NIPs.

  20. Seismic Qualification Program Plan for continued operation at DOE-SRS Nuclear Material Processing facilities

    SciTech Connect

    Talukdar, B.K.; Kennedy, W.N.

    1991-12-31

    The Savannah River Facilities for the most part were constructed and maintained to standards that were developed by Du Pont and are not rigorously in compliance with the current General Design Criteria (GDC); DOE Order 6430.1A requirements. In addition, any of the facilities were built more than 30 years ago, well before DOE standards for design were issued. The Westinghouse Savannah River Company (WSRC) has developed a program to address the evaluation of the Nuclear Material Processing (NMP) facilities to GDC requirements. The program includes a facility base-line review, assessment of areas that are not in compliance with the GDC requirements, planned corrective actions or exemptions to address the requirements, and a safety assessment. The authors from their direct involvement with the Program, describe the program plan for seismic qualification including other natural phenomena hazards for existing NMP facility structures to continue operation. Professionals involved in similar effort at other DOE facilities may find the program useful.

  1. Seismic Qualification Program Plan for continued operation at DOE-SRS Nuclear Material Processing facilities

    SciTech Connect

    Talukdar, B.K.; Kennedy, W.N.

    1991-01-01

    The Savannah River Facilities for the most part were constructed and maintained to standards that were developed by Du Pont and are not rigorously in compliance with the current General Design Criteria (GDC); DOE Order 6430.1A requirements. In addition, any of the facilities were built more than 30 years ago, well before DOE standards for design were issued. The Westinghouse Savannah River Company (WSRC) has developed a program to address the evaluation of the Nuclear Material Processing (NMP) facilities to GDC requirements. The program includes a facility base-line review, assessment of areas that are not in compliance with the GDC requirements, planned corrective actions or exemptions to address the requirements, and a safety assessment. The authors from their direct involvement with the Program, describe the program plan for seismic qualification including other natural phenomena hazards for existing NMP facility structures to continue operation. Professionals involved in similar effort at other DOE facilities may find the program useful.

  2. 76 FR 34805 - Arkansas Midland Railroad Company, Inc., Trackage Rights Exemption; Caddo Valley Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... Surface Transportation Board Arkansas Midland Railroad Company, Inc., Trackage Rights Exemption; Caddo Valley Railroad Company Pursuant to a written trackage rights agreement, Caddo Valley Railroad Company (CVR) has agreed to grant local trackage rights to Arkansas Midland Railroad Company, Inc. (AKMD)...

  3. 78 FR 23633 - Union Pacific Railroad Company-Trackage Rights Exemption-Illinois Central Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... Surface Transportation Board Union Pacific Railroad Company--Trackage Rights Exemption-- Illinois Central Railroad Company Illinois Central Railroad Company (IC), pursuant to a written agreement dated December 18, 2012, has agreed to grant overhead trackage rights to Union Pacific Railroad Company (UP) over...

  4. Experiments in hand-operated, hypersonic shock tunnel facility

    NASA Astrophysics Data System (ADS)

    Sudhiesh Kumar, Chintoo; Reddy, K. P. J.

    2015-12-01

    Experiments were conducted using the newly developed table-top, hand-operated hypersonic shock tunnel, otherwise known as the Reddy hypersonic shock tunnel. This novel instrument uses only manual force to generate the shock wave in the shock tube, and is designed to generate a freestream flow of Mach 6.5 in the test section. The flow was characterized using stagnation point pressure measurements made using fast-acting piezoelectric transducers. Schlieren visualization was also carried out to capture the bow shock in front of a hemispherical body placed in the flow. Freestream Mach numbers estimated at various points in the test section showed that for a minimum diameter of 46 mm within the test section, the value did not vary by more than 3 % along any cross-sectional plane. The results of the experiments presented here indicate that the device may be successfully employed for basic hypersonic research activities at the university level.

  5. Experimental launcher facility - ELF-I: Design and operation

    NASA Astrophysics Data System (ADS)

    Deis, D. W.; Ross, D. P.

    1982-01-01

    In order to investigate the general area of ultra-high-current density, high-velocity sliding contacts as applied to electromagnetic launcher armatures, a small experimental launcher, ELF-I, has been developed, and preliminary experiments have been performed. The system uses a 36 kJ, 5 kV capacitor bank as a primary pulse power source. When used in conjunction with a 5-microhenry pulse conditioning coil, a 100-kA peak current and 10-ms-wide pulse is obtained. A three-station 150 kV flash X-ray system is operational for obtaining in-bore photographs of the projectiles. Experimental results obtained for both metal and plasma armatures at sliding velocities of up to 1 km/s are discussed with emphasis on armature-rail interactions.

  6. The Mixed Waste Management Facility. Design basis integrated operations plan (Title I design)

    SciTech Connect

    1994-12-01

    The Mixed Waste Management Facility (MWMF) will be a fully integrated, pilotscale facility for the demonstration of low-level, organic-matrix mixed waste treatment technologies. It will provide the bridge from bench-scale demonstrated technologies to the deployment and operation of full-scale treatment facilities. The MWMF is a key element in reducing the risk in deployment of effective and environmentally acceptable treatment processes for organic mixed-waste streams. The MWMF will provide the engineering test data, formal evaluation, and operating experience that will be required for these demonstration systems to become accepted by EPA and deployable in waste treatment facilities. The deployment will also demonstrate how to approach the permitting process with the regulatory agencies and how to operate and maintain the processes in a safe manner. This document describes, at a high level, how the facility will be designed and operated to achieve this mission. It frequently refers the reader to additional documentation that provides more detail in specific areas. Effective evaluation of a technology consists of a variety of informal and formal demonstrations involving individual technology systems or subsystems, integrated technology system combinations, or complete integrated treatment trains. Informal demonstrations will typically be used to gather general operating information and to establish a basis for development of formal demonstration plans. Formal demonstrations consist of a specific series of tests that are used to rigorously demonstrate the operation or performance of a specific system configuration.

  7. 30 CFR 57.9104 - Railroad crossings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Railroad crossings. 57.9104 Section 57.9104... SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Loading, Hauling, and Dumping Traffic Safety § 57.9104 Railroad crossings. Designated railroad crossings shall be posted...

  8. 30 CFR 57.9104 - Railroad crossings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Railroad crossings. 57.9104 Section 57.9104... SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Loading, Hauling, and Dumping Traffic Safety § 57.9104 Railroad crossings. Designated railroad crossings shall be posted...

  9. 30 CFR 57.9104 - Railroad crossings.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Railroad crossings. 57.9104 Section 57.9104... SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Loading, Hauling, and Dumping Traffic Safety § 57.9104 Railroad crossings. Designated railroad crossings shall be posted...

  10. 30 CFR 57.9104 - Railroad crossings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Railroad crossings. 57.9104 Section 57.9104... SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Loading, Hauling, and Dumping Traffic Safety § 57.9104 Railroad crossings. Designated railroad crossings shall be posted...

  11. 30 CFR 57.9104 - Railroad crossings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Railroad crossings. 57.9104 Section 57.9104... SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Loading, Hauling, and Dumping Traffic Safety § 57.9104 Railroad crossings. Designated railroad crossings shall be posted...

  12. 25 CFR 169.23 - Railroads.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Railroads. 169.23 Section 169.23 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER RIGHTS-OF-WAY OVER INDIAN LANDS § 169.23 Railroads. (a..., individually owned and Government-owned land, except in the State of Oklahoma, for railroads, station...

  13. 25 CFR 169.23 - Railroads.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Railroads. 169.23 Section 169.23 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER RIGHTS-OF-WAY OVER INDIAN LANDS § 169.23 Railroads. (a..., individually owned and Government-owned land, except in the State of Oklahoma, for railroads, station...

  14. 25 CFR 169.23 - Railroads.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Railroads. 169.23 Section 169.23 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER RIGHTS-OF-WAY OVER INDIAN LANDS § 169.23 Railroads. (a..., individually owned and Government-owned land, except in the State of Oklahoma, for railroads, station...

  15. 30 CFR 56.9104 - Railroad crossings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Railroad crossings. 56.9104 Section 56.9104 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Dumping Traffic Safety § 56.9104 Railroad crossings. Designated railroad crossings shall be posted...

  16. 30 CFR 56.9104 - Railroad crossings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Railroad crossings. 56.9104 Section 56.9104 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Dumping Traffic Safety § 56.9104 Railroad crossings. Designated railroad crossings shall be posted...

  17. 25 CFR 169.23 - Railroads.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Railroads. 169.23 Section 169.23 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER RIGHTS-OF-WAY OVER INDIAN LANDS § 169.23 Railroads. (a..., individually owned and Government-owned land, except in the State of Oklahoma, for railroads, station...

  18. 30 CFR 56.9104 - Railroad crossings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Railroad crossings. 56.9104 Section 56.9104 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Dumping Traffic Safety § 56.9104 Railroad crossings. Designated railroad crossings shall be posted...

  19. 49 CFR 219.23 - Railroad policies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad policies. 219.23 Section 219.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE General § 219.23 Railroad policies. (a)...

  20. 49 CFR 219.23 - Railroad policies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad policies. 219.23 Section 219.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE General § 219.23 Railroad policies. (a)...

  1. 49 CFR 219.23 - Railroad policies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad policies. 219.23 Section 219.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE General § 219.23 Railroad policies. (a)...

  2. 30 CFR 56.9104 - Railroad crossings.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Railroad crossings. 56.9104 Section 56.9104 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Dumping Traffic Safety § 56.9104 Railroad crossings. Designated railroad crossings shall be posted...

  3. 49 CFR 219.23 - Railroad policies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad policies. 219.23 Section 219.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE General § 219.23 Railroad policies. (a)...

  4. 30 CFR 56.9104 - Railroad crossings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Railroad crossings. 56.9104 Section 56.9104 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Dumping Traffic Safety § 56.9104 Railroad crossings. Designated railroad crossings shall be posted...

  5. 49 CFR 219.23 - Railroad policies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad policies. 219.23 Section 219.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE General § 219.23 Railroad policies. (a)...

  6. 25 CFR 169.23 - Railroads.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Railroads. 169.23 Section 169.23 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER RIGHTS-OF-WAY OVER INDIAN LANDS § 169.23 Railroads. (a..., individually owned and Government-owned land, except in the State of Oklahoma, for railroads, station...

  7. 43 CFR 3275.11 - What are a facility operator's obligations?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What are a facility operator's obligations? 3275.11 Section 3275.11 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Conducting Utilization Operations §...

  8. 43 CFR 3275.11 - What are a facility operator's obligations?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What are a facility operator's obligations? 3275.11 Section 3275.11 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Conducting Utilization Operations §...

  9. 43 CFR 3275.11 - What are a facility operator's obligations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What are a facility operator's obligations? 3275.11 Section 3275.11 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Conducting Utilization Operations §...

  10. 75 FR 4111 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... January 12, 2010 (75 FR 1655). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... allowable operational leakage. The SLB/FLB leak rate ratio is only 2.49 resulting in significant...

  11. Operation of N Reactor and Fuels Fabrication Facilities, Hanford Reservation, Richland, Benton County, Washington: Environmental assessment

    SciTech Connect

    Not Available

    1980-08-01

    Environmental data, calculations and analyses show no significant adverse radiological or nonradiological impacts from current or projected future operations resulting from N Reactor, Fuels Fabrication and Spent Fuel Storage Facilities. Nonoccupational radiation exposures resulting from 1978 N Reactor operations are summarized and compared to allowable exposure limits.

  12. 75 FR 52039 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ... 3.8.7, ``Distribution Systems--Operating,'' required actions C.1 and D.1 are also deleted. Date of... August 10, 2010 (75 FR 48370). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process...

  13. 43 CFR 3275.11 - What are a facility operator's obligations?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What are a facility operator's obligations? 3275.11 Section 3275.11 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Conducting Utilization Operations §...

  14. 78 FR 40519 - Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ... be filed in accordance with the NRC's E-Filing rule (72 FR 49139; August 28, 2007). The E-Filing... COMMISSION Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving Proposed... No. DPR-46, issued to Nebraska Public Power District (the licensee), for operation of the...

  15. Operating experience review - Ventilation systems at Department of Energy Facilities

    SciTech Connect

    Not Available

    1994-05-01

    The Office of Special Projects (DP-35), formerly Office of Self-Assessment (DP-9), analyzed occurrences caused by problems with equipment and material and recommended the following systems for an in-depth study: (1) Selective Alpha Air Monitor (SAAM), (2) Emergency Diesel Generator, (3) Ventilation System, (4) Fire Alarm System. Further, DP-35 conducted an in-depth review of the problems associated with SAAM and with diesel generators, and made several recommendations. This study focusses on ventilation system. The intent was to determine the causes for the events related to these system that were reported in the Occurrence Reporting and Processing System (ORPS), to identify components that failed, and to provide technical information from the commercial and nuclear industries on the design, operation, maintenance, and surveillance related to the system and its components. From these data, sites can develop a comprehensive program of maintenance management, including surveillance, to avoid similar occurrences, and to be in compliance with the following DOE orders.

  16. High Performance Computing Facility Operational Assessment, CY 2011 Oak Ridge Leadership Computing Facility

    SciTech Connect

    Baker, Ann E; Barker, Ashley D; Bland, Arthur S Buddy; Boudwin, Kathlyn J.; Hack, James J; Kendall, Ricky A; Messer, Bronson; Rogers, James H; Shipman, Galen M; Wells, Jack C; White, Julia C; Hudson, Douglas L

    2012-02-01

    Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) continues to deliver the most powerful resources in the U.S. for open science. At 2.33 petaflops peak performance, the Cray XT Jaguar delivered more than 1.4 billion core hours in calendar year (CY) 2011 to researchers around the world for computational simulations relevant to national and energy security; advancing the frontiers of knowledge in physical sciences and areas of biological, medical, environmental, and computer sciences; and providing world-class research facilities for the nation's science enterprise. Users reported more than 670 publications this year arising from their use of OLCF resources. Of these we report the 300 in this review that are consistent with guidance provided. Scientific achievements by OLCF users cut across all range scales from atomic to molecular to large-scale structures. At the atomic scale, researchers discovered that the anomalously long half-life of Carbon-14 can be explained by calculating, for the first time, the very complex three-body interactions between all the neutrons and protons in the nucleus. At the molecular scale, researchers combined experimental results from LBL's light source and simulations on Jaguar to discover how DNA replication continues past a damaged site so a mutation can be repaired later. Other researchers combined experimental results from ORNL's Spallation Neutron Source and simulations on Jaguar to reveal the molecular structure of ligno-cellulosic material used in bioethanol production. This year, Jaguar has been used to do billion-cell CFD calculations to develop shock wave compression turbo machinery as a means to meet DOE goals for reducing carbon sequestration costs. General Electric used Jaguar to calculate the unsteady flow through turbo machinery to learn what efficiencies the traditional steady flow assumption is hiding from designers. Even a 1% improvement in turbine design can save the nation billions of gallons of

  17. Slavery and the Underground Railroad.

    ERIC Educational Resources Information Center

    Anderson, Nancy Comfort

    2000-01-01

    Presents a bibliography of sources to help children understand slavery and the Underground Railroad and recommends a combination of fiction and nonfiction for a better understanding. Includes picture books, biographies of people who played prominent roles during the time of slavery, nonfiction books for older readers, and videotape. (LRW)

  18. Railroad safety program, task 2

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Aspects of railroad safety and the preparation of a National Inspection Plan (NIP) for rail safety improvement are examined. Methodology for the allocation of inspection resources, preparation of a NIP instruction manual, and recommendations for future NIP, are described. A statistical analysis of regional rail accidents is presented with causes and suggested preventive measures included.

  19. Overview of the DOE Waste Facilities Operations Robotics Technology Development Program

    SciTech Connect

    Ward, C.R.

    1992-07-01

    The Department of Energy`s Office of Technology Development has initiated a Robotics Technology Development Program that includes technology aimed at DOE Waste Facilities Operations (WFO). Much of this technology may also be applicable to waste facilities outside of DOE and will be available for use. This is a team effort of several DOE Laboratories and Sites. The WFO team includes the Savannah River Technology Center, Sandia National Laboratories, Oak Ridge National Laboratory, Idaho National Engineering Laboratory, Lawrence Livermore National Laboratory, the Fernald Environmental Management Project and the Waste Isolation Pilot Plant. DOE has waste facilities currently in operation at many sites and many more of these facilities are planned as part of the DOE site cleanup effort. As the cleanup continues, existing facilities and new facilities will be taxed with an increasing volume of waste, more varied waste streams, more complex processing requirements, more challenging waste characteristics, more stringent waste form criteria, and stricter regulations. The WFO Robotics Technology Development Program will address these challenges by developing robotic systems technology that will be safer, better, faster, and cheaper than existing technology. The goals of this technology development are to remove humans from both radiologically and physically dangerous environments in waste facilities, improve the quality and quality assurance of operations, increase the throughput of operations, increase the flexibility of facilities, reduce the manpower requirements for operations and meet federal, state and local regulations. There are four areas within the WFO program; the Mixed Waste Treatment Project, Stored Waste, the Waste Isolation Pilot Plant and Remote Size Reduction.

  20. Pre-operational environmental monitoring plan for the Device Assembly Facility at the Nevada Test Site

    SciTech Connect

    Ferate, F.D.

    1995-01-01

    Nuclear explosives operations have been and may continue to be an important component of the DOE mission at the NTS. This mission has been to conduct the nation`s nuclear testing program in a safe, secure, and efficient manner while assuring full compliance with state and federal regulations, and DOE order`s and directives. These operations have generally included assembly, disassembly or modification, staging, transportation, and tesbng of nuclear explosive devices. They may also include maintenance, repair, retrofit, and surveillance. The Device Assembly Facility (DAF) was constructed to provide a dedicated facility in which to prepare nuclear explosives assemblies for their intended disposition. This facility will provide for combined operations (replacing two separate facilities) and incorporates state-of-the-art safety and security features while minimizing the risks of environmental impacts. The facility has been completed but not yet operated, so the impacts to be considered will b e based on normal operations and not on the impacts of construction activities. The impacts will arise from nuclear explosives operations that require the handling of high explosives in combination with special nuclear materials. Wastes from operation of the earlier device assembly facilities have included grams of epoxies, pints of solvents, and small quantities of waste explosives. These are hazardous (includes radioactive) wastes and are disposed of in accordance with state and federal regulations. Assuming similar operations at the DAF, non-hazardous (includes non-radioactive) solid waste would be transported to a permitted landfill. Waste explosives would be sent to the Area 11 Explosive Ordnance Disposal Unit. Other hazardous waste would be sent to the Area 5 Radioactive Waste.Management Site for shipment or burial.

  1. Joint Assessment of ETRR-2 Research Reactor Operations Program, Capabilities, and Facilities

    SciTech Connect

    Bissani, M; O'Kelly, D S

    2006-05-08

    A joint assessment meeting was conducted at the Egyptian Atomic Energy Agency (EAEA) followed by a tour of Egyptian Second Research Reactor (ETRR-2) on March 22 and 23, 2006. The purpose of the visit was to evaluate the capabilities of the new research reactor and its operations under Action Sheet 4 between the U.S. DOE and the EAEA, ''Research Reactor Operation'', and Action Sheet 6, ''Technical assistance in The Production of Radioisotopes''. Preliminary Recommendations of the joint assessment are as follows: (1) ETRR-2 utilization should be increased by encouraging frequent and sustained operations. This can be accomplished in part by (a) Improving the supply-chain management for fresh reactor fuel and alleviating the perception that the existing fuel inventory should be conserved due to unreliable fuel supply; and (b) Promulgating a policy for sample irradiation priority that encourages the use of the reactor and does not leave the decision of when to operate entirely at the discretion of reactor operations staff. (2) Each experimental facility in operation or built for a single purpose should be reevaluated to focus on those that most meet the goals of the EAEA strategic business plan. Temporary or long-term elimination of some experimental programs might be necessary to provide more focused utilization. There may be instances of emerging reactor applications for which no experimental facility is yet designed or envisioned. In some cases, an experimental facility may have a more beneficial use than the purpose for which it was originally designed. For example, (a) An effective Boron Neutron Capture Therapy (BNCT) program requires nearby high quality medical facilities. These facilities are not available and are unlikely to be constructed near the Inshas site. Further, the BNCT facility is not correctly designed for advanced research and therapy programs using epithermal neutrons. (b) The ETRR-2 is frequently operated to provide color-enhanced gemstones but is

  2. Architecture and operation of the Z Pulsed Power Facility vacuum system.

    SciTech Connect

    Riddle, Allen Chauncey; Petmecky, Don; Weed, John Woodruff

    2010-11-01

    The Z Pulsed Power Facility at Sandia National Laboratories in Albuquerque, New Mexico, USA is one of the world's premier high energy density physics facilities. The Z Facility derives its name from the z-pinch phenomena which is a type of plasma confinement system that uses the electrical current in the plasma to generate a magnetic field that compresses it. Z refers to the direction of current flow, the z axis in a three dimensional Cartesian coordinate system. The multiterawatt, multimegajoule electrical pulse the Facility produces is 100-400 nanoseconds in time. Research and development programs currently being conducted on the Z Facility include inertial confinement fusion, dynamic material properties, laboratory astrophysics and radiation effects. The Z Facility vacuum system consists of two subsystems, center section and load diagnostics. Dry roughing pumps and cryogenic high vacuum pumps are used to evacuate the 40,000 liter, 200 square meter center section of the facility where the experimental load is located. Pumping times on the order of two hours are required to reduce the pressure from atmospheric to 10{sup -5} Torr. The center section is cycled from atmosphere to high vacuum for each experiment. The facility is capable of conducting one to two experiments per day. Numerous smaller vacuum pumping systems are used to evacuate load diagnostics. The megajoules of energy released during an experiment causes damage to the Facility that presents numerous challenges for reliable operation of the vacuum system.

  3. Operational Radiation Protection in Synchrotron Light and Free Electron Laser Facilities

    SciTech Connect

    Liu, James C.; Rokni, Sayed H.; Vylet, Vaclav; /Jefferson Lab

    2009-12-11

    The 3rd generation synchrotron radiation (SR) facilities are storage ring based facilities with many insertion devices and photon beamlines, and have low injection beam power (< few tens of watts), but extremely high stored beam power ({approx} 1 GW). The 4th generation x-ray free electron laser (FEL) facilities are based on an electron Linac with a long undulator and have high injection beam power (a few kW). Due to its electron and photon beam characteristics and modes of operation, storage ring and photon beamlines have unique safety aspects, which are the main subjects of this paper. The shielding design limits, operational modes, and beam losses are first reviewed. Shielding analysis (source terms and methodologies) and interlocked safety systems for storage ring and photon beamlines (including SR and gas bremsstrahlung) are described. Specific safety issues for storage ring top-off injection operation and FEL facilities are discussed. The operational safety program, e.g., operation authorization, commissioning, training, and radiation measurements, for SR facilities is also presented.

  4. LESSONS LEARNED - STARTUP AND TRANSITION TO OPERATIONS AT THE 200 WEST PUMP AND TREAT FACILITY

    SciTech Connect

    FINK DE; BERGQUIST GG; BURKE SP

    2012-10-03

    This document lists key Lessons Learned from the Startup Team for the 200 West Pump and Treat Facility Project. The Startup Team on this Project was an integrated, multi-discipline team whose scope was Construction Acceptance Testing (CAT), functional Acceptance Testing Procedures (ATP), and procedure development and implementation. Both maintenance and operations procedures were developed. Included in the operations procedures were the process unit operations. In addition, a training and qualification program was also part of the scope.

  5. Model training curriculum for Low-Level Radioactive Waste Disposal Facility Operations

    SciTech Connect

    Tyner, C.J.; Birk, S.M.

    1995-09-01

    This document is to assist in the development of the training programs required to be in place for the operating license for a low-level radioactive waste disposal facility. It consists of an introductory document and four additional appendixes of individual training program curricula. This information will provide the starting point for the more detailed facility-specific training programs that will be developed as the facility hires and trains new personnel and begins operation. This document is comprehensive and is intended as a guide for the development of a company- or facility-specific program. The individual licensee does not need to use this model training curriculum as written. Instead, this document can be used as a menu for the development, modification, or verification of customized training programs.

  6. Environmental monitoring for detection of uranium enrichment operations: Comparison of LEU and HEU facilities

    SciTech Connect

    Hembree, D.M. Jr.; Carter, J.A.; Ross, H.H.

    1995-03-01

    In 1994, the International Atomic Energy Agency (IAEA) initiated an ambitious program of worldwide field trials to evaluate the utility of environmental monitoring for safeguards. Part of this program involved two extensive United States field trials conducted at the large uranium enrichment facilities. The Paducah operation involves a large low-enriched uranium (LEU) gaseous diffusion plant while the Portsmouth facilities include a large gaseous diffusion plant that has produced both LEU and high-enriched uranium (HEU) as well as an LEU centrifuge facility. As a result of the Energy Policy Act of 1992, management of the uranium enrichment operations was assumed by the US Enrichment Corporation (USEC). The facilities are operated under contract by Martin Marietta Utility Services. Martin Marietta Energy Systems manages the environmental restoration and waste management programs at Portsmouth and Paducah for DOE. These field trials were conducted. Samples included swipes from inside and outside process buildings, vegetation and soil samples taken from locations up to 8 km from main sites, and hydrologic samples taken on the sites and at varying distances from the sites. Analytical results from bulk analysis were obtained using high abundance sensitivity thermal ionization mm spectrometers (TIMS). Uranium isotopics altered from the normal background percentages were found for all the sample types listed above, even on vegetation 5 km from one of the enrichment facilities. The results from these field trials demonstrate that dilution by natural background uranium does not remove from environmental samples the distinctive signatures that are characteristic of enrichment operations. Data from swipe samples taken within the enrichment facilities were particularly revealing. Particulate analysis of these swipes provided a detailed ``history`` of both facilities, including the assays of the end product and tails for both facilities.

  7. Operational modes for a wave injection facility aboard spacelab and a sub-satellite

    NASA Technical Reports Server (NTRS)

    Dyson, P. L.

    1978-01-01

    Various modes of operation are described for an orbiting wave injection facility planned to measure the properties of waves propagating in space plasma. Such a facility would cover a wide frequency range including MF and HF. Phase shift and Doppler shift measurements will yield more accurate measurements of echo time delay and the angle of arrival. Because Spacelab will involve some sub-satellites, some consideration is given to propagation between two vehicles both at HF and VHF.

  8. Hazard and operability study of the multi-function Waste Tank Facility. Revision 1

    SciTech Connect

    Hughes, M.E.

    1995-05-15

    The Multi-Function Waste Tank Facility (MWTF) East site will be constructed on the west side of the 200E area and the MWTF West site will be constructed in the SW quadrant of the 200W site in the Hanford Area. This is a description of facility hazards that site personnel or the general public could potentially be exposed to during operation. A list of preliminary Design Basis Accidents was developed.

  9. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... facilities, include in your monthly report of facility operations: (1) Mass of steam and/or hot water, in klbs, used or brought into the facility. For facilities using both steam and hot water, you must report the mass of each; (2) The temperature of the steam or hot water in deg. F; (3) The pressure of...

  10. Reference Mission Operational Analysis Document (RMOAD) for the Life Sciences Research Facilities

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The space station will be constructed during the next decade as an orbiting, low-gravity, permanent facility. The facility will provide a multitude of research opportunities for many different users. The pressurized research laboratory will allow life scientists to study the effects of long-term exposure to microgravity on humans, animals, and plants. The results of these studies will increase our understanding of this foreign environment on basic life processes and ensure the safety of man's long-term presence in space. This document establishes initial operational requirements for the use of the Life Sciences Research Facility (LSRF) during its construction.

  11. 17 CFR 37.8 - Boards of trade operating both a designated contract market and a swap execution facility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... a designated contract market and a swap execution facility. 37.8 Section 37.8 Commodity and... Boards of trade operating both a designated contract market and a swap execution facility. (a) An entity that intends to operate both a designated contract market and a swap execution facility...

  12. 340 Waste Handling Facility interim safety basis

    SciTech Connect

    Bendixsen, R.B.

    1995-04-03

    This document establishes the interim safety basis (ISB) for the 340 Waste Handling Facility (340 Facility). An ISB is a documented safety basis that provides a justification for the continued operation of the facility until an upgraded final safety analysis report is prepared that complies with US Department of Energy (DOE) Order 5480.23, Nuclear Safety Analysis Reports. The ISB for the 340 Facility documents the current design and operation of the facility. The 340 Facility ISB (ISB-003) is based on a facility walkdown and review of the design and operation of the facility, as described in the existing safety documentation. The safety documents reviewed, to develop ISB-003, include the following: OSD-SW-153-0001, Operating Specification Document for the 340 Waste Handling Facility (WHC 1990); OSR-SW-152-00003, Operating Limits for the 340 Waste Handling Facility (WHC 1989); SD-RE-SAP-013, Safety Analysis Report for Packaging, Railroad Liquid Waste Tank Cars (Mercado 1993); SD-WM-TM-001, Safety Assessment Document for the 340 Waste Handling Facility (Berneski 1994a); SD-WM-SEL-016, 340 Facility Safety Equipment List (Berneski 1992); and 340 Complex Fire Hazard Analysis, Draft (Hughes Assoc. Inc. 1994).

  13. Developing meaningful metrics of clinical productivity for military treatment facility anesthesiology departments and operative services.

    PubMed

    Mongan, Paul D; Van der Schuur, L T Brian; Damiano, Louis A; Via, Darin K

    2003-11-01

    Comparing clinical productivity is important for strategic planning and the evaluation of resource allocation in any large organization. This process of benchmarking performance allows for the comparison of groups with similar characteristics. However, this process is often difficult when comparing the operative service productivity of large and small military treatment facilities because of the significant heterogeneity in mission focus and case complexity. However, in this article, we describe the application of a new method of benchmarking operative service productivity based on normalizing data for operating room sites, cases, and total American Society of Anesthesiologists units produced per hour. We demonstrate how these benchmarks allow for valid comparisons of operative service productivity among these military treatment facilities and how the data could be used in expanding or contracting operating locations. In addition, these benchmarks are compared with those derived from the use of this system in the civilian sector. PMID:14680041

  14. 76 FR 77889 - Watco Holdings, Inc.-Continuance in Control Exemption-Swan Ranch Railroad, L.L.C.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ..., L.L.C. Watco Holdings, Inc. (Watco) has filed a verified notice of exemption pursuant to 49 CFR 1180.2(d)(2) to continue in control of Swan Ranch Railroad, L.L.C. (SRR), upon SRR's becoming a Class III... Railroad, L.L.C.-- Operation Exemption-Swan Industrial Park, wherein SRR seeks Board approval to operate...

  15. Mutual design of overhead transmission lines and railroad communications and signal systems. Volume 2. Appendixes. Final report

    SciTech Connect

    Taflove, A.; Umashankar, K.R.

    1983-10-01

    Objective was to develop mutual design methods and criteria for overhead ac transmission lines and adjacent railroad systems. This project has addressed basic engineering issues which govern the operation of railroad communications and signal (C and S) systems under conditions of interference from nearby transmission lines. Data and techniques have been compiled and developed to contribute to the achievement of electromagnetic compatibility in a manner that is acceptable to both the power and railroad industries.

  16. Energy Conservation Projects to Benefit the Railroad Industry

    SciTech Connect

    Clifford Mirman; Promod Vohra

    2009-12-31

    The Energy Conservation Projects to benefit the railroad industry using the Norfolk Southern Company as a model for the railroad industry has five unique tasks which are in areas of importance within the rail industry, and specifically in the area of energy conservation. The NIU Engineering and Technology research team looked at five significant areas in which research and development work can provide unique solutions to the railroad industry in energy the conservation. (1) Alternate Fuels - An examination of various blends of bio-based diesel fuels for the railroad industry, using Norfolk Southern as a model for the industry. The team determined that bio-diesel fuel is a suitable alternative to using straight diesel fuel, however, the cost and availability across the country varies to a great extent. (2) Utilization of fuel cells for locomotive power systems - While the application of the fuel cell has been successfully demonstrated in the passenger car, this is a very advanced topic for the railroad industry. There are many safety and power issues that the research team examined. (3) Thermal and emission reduction for current large scale diesel engines - The current locomotive system generates large amount of heat through engine cooling and heat dissipation when the traction motors are used to decelerate the train. The research team evaluated thermal management systems to efficiently deal with large thermal loads developed by the operating engines. (4) Use of Composite and Exotic Replacement Materials - Research team redesigned various components using new materials, coatings, and processes to provide the needed protection. Through design, analysis, and testing, new parts that can withstand the hostile environments were developed. (5) Tribology Applications - Identification of tribology issues in the Railroad industry which play a significant role in the improvement of energy usage. Research team analyzed and developed solutions which resulted in friction

  17. Response of spawning lake sturgeons to change in hydroelectric facility operation

    SciTech Connect

    Auer, N.A.

    1996-01-01

    Spawning of lake sturgeon Acipenser fulvescens was documented from 1987 to 1992 below the Prickett hydroelectric facility on the Sturgeon River, a tributary to Portage Lake, Michigan. Lake sturgeons were captured at the spawning site with dip nets during periods of reduced flow. A change in the spawning characteristics of the population was noted that corresponded to a changed in the operation of the hydroelectric facility. In 1987 and 1988 the facility operated in a peaking mode, which resulted in large daily fluctuations in river flows. The years 1989 and 1990 were years of transition, and in 1991 and 1992 the facility released near run-of-the-river (ROR) flows. Under near-ROR flows, which were more natural, adult lake sturgeons spent 4-6 weeks less at the spawning sites, 74% more fish were observed, weights were greater due to a 68% increase in number of females, and fish had increased reproductive readiness. The change in flow regime was the result of a Federal Energy Regulatory Commission relicensing action. The positive response observed in lake sturgeon spawning activity that resulted from the change of facility operation to near-ROR flows should be beneficial to the survival and perpetuation of this population. Similar results may be experienced in other lake sturgeon waters affected by manipulated flow regimes. 28 refs., 5 figs., 6 tabs.

  18. 76 FR 79271 - Genesee & Wyoming Inc.-Continuance in Control Exemption-Hilton & Albany Railroad, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-21

    ... with 3 rail lines controlled by GWI: Chattahoochee Bay Railroad (CHAT), Chattahoochee Industrial Railroad, and Georgia Southwestern Railroad, and indirectly with a fourth, the Bay Line Railroad (via...

  19. Operation of the cryogenic system for the Mirror Fusion Test Facility

    SciTech Connect

    Chronis, W.C.; Slack, D.S.

    1987-06-09

    The cryogenic system for the Mirror Fusion Test Facility (MFTF) at Lawrence Livermore National Laboratory (LLNL) was designed to cool the entire MFTF-B system from ambient to operating temperature in less than 10 days. The system was successfully operated in the recent plant and capital equipment (PACE) acceptance tests, and results from these tests helped us correct problem areas and improve the system.

  20. Review of operating experience at the Los Alamos Plutonium Electrorefining Facility, 1963-1977

    SciTech Connect

    Mullins, L.J.; Morgan, A.N.

    1981-12-01

    This report reviews the operation of the Los Alamos Plutonium Electrorefining Plant at Technical Area 21 for the period 1964 through 1977. During that period, approximately 1568 kg of plutonium metal, > 99.95% pure, was produced in 653 runs from 1930 kg of metal fabrication scrap, 99% pure. General considerations of the electrorefining process and facility operation and recommendations for further improvement of the process are discussed.

  1. Optimum electric utility spot price determinations for small power producing facilities operating under PURPA provisions

    SciTech Connect

    Ghoudjehbaklou, H. ); Puttgen, H.B. )

    1988-09-01

    The present paper outlines an optimum spot price determination procedure in the general context of the Public Utility Regulatory Policies Act, PURPA, provisions. PURPA stipulates that local utilities must offer to purchase all available excess electric energy from Qualifying Facilities, QF, at fair market prices. As a direct consequence of these PURPA regulations, a growing number of owners are installing power producing facilities and optimize their operational schedules to minimize their utility related costs or, in some cases, actually maximize their revenues from energy sales to the local utility. In turn, the utility will strive to use spot prices which maximize its revenues from any given Small Power Producing Facility, SPPF, schedule while respecting the general regulatory and contractual framework. The proposed optimum spot price determination procedure fully models the SPPF operation, it enforces the contractual and regulatory restrictions, and it ensures the uniqueness of the optimum SPPF schedule.

  2. Optimum electric utility spot price determinations for small power producing facilities operating under PURPA provisions

    SciTech Connect

    Ghoudjehbaklou, H.; Puttgen, H.B.

    1988-01-01

    This paper outlines an optimum spot price determination procedure in the general context of the Public Utility Regulatory Policies Act, PURPA, provisions. PURPA stipulates that local utilities must offer to purchase all available excess electric energy from Qualifying Facilities, QF, at fair market prices. As a direct consequence of these PURPA regulations, a growing number of owners are installing power producing facilities and optimize their operational schedules to minimize their utility related costs or, in some cases, actually maximize their revenues from energy sales to the local utility. In turn, the utility strives to use spot prices which maximize its revenues from any given Small Power Producing Facility, SPPF, a schedule while respecting the general regulatory and contractual framework. the proposed optimum spot price determination procedure fully models the SPPF operation, it enforces the contractual and regulatory restrictions, and it ensures the uniqueness of the optimum SPPF schedule.

  3. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... monthly report for facility operations? 3276.12 Section 3276.12 Public Lands: Interior Regulations... MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.12 What information must I give BLM in the monthly report for facility operations? (a) For all electrical...

  4. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... monthly report for facility operations? 3276.12 Section 3276.12 Public Lands: Interior Regulations... MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.12 What information must I give BLM in the monthly report for facility operations? (a) For all electrical...

  5. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... monthly report for facility operations? 3276.12 Section 3276.12 Public Lands: Interior Regulations... MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.12 What information must I give BLM in the monthly report for facility operations? (a) For all electrical...

  6. 17 CFR 38.9 - Boards of trade operating both a designated contract market and a swap execution facility.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... a designated contract market and a swap execution facility. 38.9 Section 38.9 Commodity and....9 Boards of trade operating both a designated contract market and a swap execution facility. (a) A board of trade that operates a designated contract market and that intends to also operate a...

  7. 17 CFR 38.9 - Boards of trade operating both a designated contract market and a swap execution facility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... a designated contract market and a swap execution facility. 38.9 Section 38.9 Commodity and....9 Boards of trade operating both a designated contract market and a swap execution facility. (a) A board of trade that operates a designated contract market and that intends to also operate a...

  8. 26 CFR 1.132-7T - Treatment of employer-operated eating facilities-1985 through 1988 (temporary).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Treatment of employer-operated eating facilities... Excluded from Gross Income § 1.132-7T Treatment of employer-operated eating facilities—1985 through 1988...-operated eating facility for employees is excludable from gross income as a de minimis fringe only if—...

  9. A knowledge acquisition process to analyse operational problems in solid waste management facilities.

    PubMed

    Dokas, Ioannis M; Panagiotakopoulos, Demetrios C

    2006-08-01

    The available expertise on managing and operating solid waste management (SWM) facilities varies among countries and among types of facilities. Few experts are willing to record their experience, while few researchers systematically investigate the chains of events that could trigger operational failures in a facility; expertise acquisition and dissemination, in SWM, is neither popular nor easy, despite the great need for it. This paper presents a knowledge acquisition process aimed at capturing, codifying and expanding reliable expertise and propagating it to non-experts. The knowledge engineer (KE), the person performing the acquisition, must identify the events (or causes) that could trigger a failure, determine whether a specific event could trigger more than one failure, and establish how various events are related among themselves and how they are linked to specific operational problems. The proposed process, which utilizes logic diagrams (fault trees) widely used in system safety and reliability analyses, was used for the analysis of 24 common landfill operational problems. The acquired knowledge led to the development of a web-based expert system (Landfill Operation Management Advisor, http://loma.civil.duth.gr), which estimates the occurrence possibility of operational problems, provides advice and suggests solutions. PMID:16941992

  10. 75 FR 9445 - Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-02

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to...

  11. 75 FR 20627 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... 6, 2010 (75 FR 17439). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... Significant Hazards Considerations I. Background Pursuant to Section 189a. (2) of the Atomic Energy Act...

  12. 78 FR 60321 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the...

  13. 76 FR 18801 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... March 22, 2011 (76 FR 16004). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires..., 2011 (76 FR 1646). The letter dated December 9, 2010, provided additional information that...

  14. 75 FR 70032 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations I. Background Pursuant to section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S....

  15. 78 FR 35066 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access...

  16. Laser Ion Source Operation at the TRIUMF Radioactive Ion Beam Facility

    NASA Astrophysics Data System (ADS)

    Lassen, J.; Bricault, P.; Dombsky, M.; Lavoie, J. P.; Gillner, M.; Gottwald, T.; Hellbusch, F.; Teigelhöfer, A.; Voss, A.; Wendt, K. D. A.

    2009-03-01

    The TRIUMF Resonant Ionization Laser Ion Source (RILIS) for radioactive ion beam production is presented, with target ion source, laser beam transport, laser system and operation. In this context aspects of titanium sapphire (TiSa) laser based RILIS and facility requirements are discussed and results from the first years of TRILIS RIB delivery are given.

  17. 76 FR 16004 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... March 8, 2011 (76 FR 12763). Notice of Consideration of Issuance of Amendments to Facility Operating... Register: March 1, 2011 (FR 76 11291). Expiration date of individual notice: March 31, 2011...

  18. 76 FR 4381 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... January 11, 2011 (76 FR 1644). Notice of Consideration of Issuance of Amendments to Facility Operating... be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing... Federal Register on October 17, 2006 (71 FR 61075), on possible amendments adopting TSTF-448, including...

  19. 75 FR 32509 - Notice Applications and Amendments to Facility Operating Licenses Involving Proposed No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Notice Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to...

  20. 76 FR 20377 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to...

  1. 76 FR 48908 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear...

  2. 78 FR 11688 - Biweekly Notice, Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the...

  3. 77 FR 67837 - Callaway Plant, Unit 1; Application for Amendment to Facility Operating License

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-14

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Callaway Plant, Unit 1; Application for Amendment to Facility Operating License AGENCY: Nuclear Regulatory Commission. ACTION: License amendment application; withdrawal. ADDRESSES: Please refer to Docket ID NRC-2012-0275 when contacting the...

  4. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false How must the facility operator measure the geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Conducting...

  5. 76 FR 37845 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations Background Pursuant to section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear...

  6. 75 FR 61521 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations I. Background Pursuant to section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S....

  7. 78 FR 19746 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the...

  8. 75 FR 23808 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... 20, 2010 (75 FR 20627). Notice of Consideration of Issuance of Amendments to Facility Operating... be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing... for Unit No. 1. The transition is planned to occur over three refueling cycles on each unit. Basis...

  9. 41 CFR 101-5.105 - Operation of the centralized facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Operation of the centralized facility. 101-5.105 Section 101-5.105 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 5-CENTRALIZED SERVICES...

  10. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS...

  11. 76 FR 28470 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ..., 2011 (76 FR 24926). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... consideration (NSHC) analysis endorsed by the NRC staff in a December 29, 2006, Federal Register notice (71...

  12. 76 FR 31369 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ..., 2011 (76 FR 28470). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... on December 17, 2010 (75 FR 79048) as part of the consolidated line item improvement process...

  13. 76 FR 6830 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... January 25, 2011 (76 FR 4381). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... (75 FR 44023). The supplemental letter dated August 24, 2010, provided additional information...

  14. 75 FR 48370 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... 27, 2010 (75 FR 44020). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... supersedes the notice published in the Federal Register on August 11, 2009, (74 FR 40235), in its...

  15. 75 FR 1655 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-12

    ... on December 29, 2009 (74 FR 68867). Notice of Issuance of Amendments to Facility Operating Licenses... Register: October 6, 2009 (74 FR 51330). The Commission's related evaluation of the amendment is contained... Register: April 21, 2009 (74 FR 18254). The Commission's related evaluation of the amendment is...

  16. 43 CFR 3275.12 - What environmental and safety requirements apply to facility operations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What environmental and safety requirements apply to facility operations? 3275.12 Section 3275.12 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING...

  17. CVD Diamond Detector Stability Issues for Operation at the National Ignition Facility

    SciTech Connect

    Schmid, G J; Koch, J A; Moran, M J; Lerche, R A; Izumi, N; Phillips, T W; Glebov, V Y; Sangster, T C; Stoeckl, C

    2003-08-22

    Synthetic diamond crystals produced by the Chemical Vapor Deposition (CVD) technique can serve as fast, radiation hard, neutron sensors for the National Ignition Facility (NIF). Here we explore the stability issues, such as charge trapping and high-flux saturation, that will be relevant to operation at the NIF.

  18. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities. 157.208 Section 157.208 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS...

  19. 33 CFR 208.10 - Local flood protection works; maintenance and operation of structures and facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Local flood protection works; maintenance and operation of structures and facilities. 208.10 Section 208.10 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.10 Local flood protection works;...

  20. 77 FR 26321 - Reed College, Reed Research Nuclear Reactor, Renewed Facility Operating License No. R-112

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... Opportunity for Hearing published in the Federal Register on August 19, 2011 (76 FR 52018- 52022). The NRC... Register on March 30, 2012 (77 FR 19362-19366), and concluded that renewal of the facility operating...-water cooled, and shielded TRIGA (Training, Research, Isotope Production, General Atomics) reactor...

  1. 75 FR 33839 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-15

    ..., 2010 (75 FR 30440). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... Federal Register on July 6, 2009 (74 FR 31996). The notice included a model safety evaluation and a...

  2. 75 FR 39975 - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... FR 37471). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... Federal Register (FR) on December 29, 2009 (74 FR 68870). Due to certain changes in the specifics...

  3. 77 FR 66486 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access...

  4. 76 FR 12763 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... February 22, 2011 (76 FR 9821). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... Specifications. Date of initial notice in Federal Register: May 4, 2010 (75 FR 23810). The letters dated July...

  5. 76 FR 67485 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations Background Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear...

  6. 78 FR 47785 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-06

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the...

  7. 75 FR 67399 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... October 19, 2010 (75 FR 64359). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... Specifications. Date of initial notice in Federal Register: April 6, 2010 (75 FR 17444). The Commission's...

  8. 75 FR 64359 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations I. Background Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S....

  9. 75 FR 37471 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ..., 2010 (75 FR 33839). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing..., Technical Specification 3.8.1.1 ACTION b requires the unit be in at least HOT SHUTDOWN within the next...

  10. 75 FR 17439 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-06

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations I. Background Pursuant to section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S....

  11. 78 FR 16302 - Crystal River Unit 3 Nuclear Generating Plant, Application for Amendment to Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... Consideration of Issuance of Amendment published in the Federal Register on January 11, 2012 (77 FR 1743), and a... published in the Federal Register on January 16, 2013 (78 FR 3458). However, by letter dated February 7... Florida, Citrus County. The proposed amendment would have revised the facility operating license and...

  12. Operation, Maintenance and Management of Wastewater Treatment Facilities: A Bibliography of Technical Documents.

    ERIC Educational Resources Information Center

    Himes, Dottie

    This is an annotated bibliography of wastewater treatment manuals. Fourteen manuals are abstracted including: (1) A Planned Maintenance Management System for Municipal Wastewater Treatment Plants; (2) Anaerobic Sludge Digestion, Operations Manual; (3) Emergency Planning for Municipal Wastewater Treatment Facilities; (4) Estimating Laboratory Needs…

  13. University of Washington Clinical Neutron Facility: Report on 26 Years of Operation

    SciTech Connect

    Laramore, George E.; Emery, Robert; Reid, David; Banerian, Stefani; Kalet, Ira; Jacky, Jonathan; Risler, Ruedi

    2011-12-13

    Particle radiotherapy facilities are highly capital intensive and must operate over decades to recoup the original investment. We describe the successful, long-term operation of a neutron radiotherapy center at the University of Washington, which has been operating continuously since September 1984. To date, 2836 patients have received neutron radiotherapy. The mission of the facility has also evolved to include the production of unique radioisotopes that cannot be made with the low-energy cyclotrons more commonly found in nuclear medicine departments. The facility is also used for neutron damage testing for industrial devices. In this paper, we describe the challenges of operating such a facility over an extended time period, including a planned maintenance and upgrade program serving diverse user groups, and summarize the major clinical results in terms of tumor control and normal tissue toxicity. Over time, the mix of patients being treated has shifted from common tumors such as prostate cancer, lung cancer, and squamous cell tumors of the head and neck to the rarer tumors such as salivary gland tumors and sarcomas due to the results of clinical trials. Current indications for neutron radiotherapy are described and neutron tolerance doses for a range of normal tissues presented.

  14. 77 FR 1743 - Facility Operating License Amendment From Florida Power Corporation, Crystal River Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Facility Operating License Amendment From Florida Power Corporation, Crystal River Nuclear Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: License amendment; opportunity to request a hearing, petition for leave to...

  15. 75 FR 27825 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... May 4, 2010 (75 FR 23808). Notice of Consideration of Issuance of Amendments to Facility Operating... be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing... Federal Register on October 22, 2003 (68 FR 60422) as part of the consolidated line item...

  16. 75 FR 44020 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ..., 2010 (75 FR 39975). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... proposed determination. Any comments received within 30 days after the date of publication of this notice... amendment until the expiration of 60 days after the date of publication of this notice. The Commission...

  17. 75 FR 6408 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ..., 2010 (75 FR 4111). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... Federal Register: November 3, 2009 (74 FR 56886). The supplement letter dated November 16, 2009,...

  18. 76 FR 27094 - Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Safeguards Information and Order Imposing...

  19. 46 CFR 160.151-47 - Requirements for owners or operators of servicing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Requirements for owners or operators of servicing facilities. 160.151-47 Section 160.151-47 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Liferafts (SOLAS) § 160.151-47 Requirements...

  20. 75 FR 30440 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... (75 FR 27825). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... for licensee: Ms. Lisa F. Vaughn, Associate General Counsel and Managing Attorney, Duke...