Science.gov

Sample records for railroad facility operations

  1. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning...

  2. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning...

  3. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning...

  4. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning...

  5. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall...

  6. 77 FR 75701 - Landisville Railroad, LLC-Operation Exemption-Buckeye East Chicago Railroad LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Surface Transportation Board Landisville Railroad, LLC--Operation Exemption--Buckeye East Chicago Railroad LLC Landisville Railroad, LLC (Landisville), a Class III rail carrier, has filed a verified notice of... railroad right-of-way, and bulk liquid transloading facilities owned by Buckeye East Chicago Railroad,...

  7. 75 FR 11224 - Albany & Eastern Railroad Company-Acquisition and Operation Exemption-Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... TRANSPORTATION Surface Transportation Board Albany & Eastern Railroad Company--Acquisition and Operation Exemption--Union Pacific Railroad Company and Willamette & Pacific Railroad, Inc. Albany & Eastern Railroad...) Acquire the rail freight easement from Union Pacific Railroad Company (UP), the current owner of the...

  8. 76 FR 50326 - Tyburn Railroad, LLC-Acquisition and Operation Exemption-Tyburn Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Surface Transportation Board Tyburn Railroad, LLC--Acquisition and Operation Exemption--Tyburn Railroad Company Tyburn Railroad, LLC (Tyburn), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Tyburn Railroad Company and operate approximately 0.9 miles of rail lines...

  9. Control of railroad operations: Algorithms and economics

    SciTech Connect

    Harker, P.

    1994-12-31

    This paper presents the results of a seven-year research effort to apply optimization models and techniques to improve productivity and reliability of freight railroad operations. After describing the basic modelling framework, a series of optimization models will be described in detail along with the results of their application. The paper ends with a discussion of the future research opportunities in this area.

  10. 76 FR 52384 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... used by the railroads to adjust their gross annual operating revenues for classification purposes. This indexing methodology insures that railroads are classified based on real business expansion and not...

  11. 78 FR 21007 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ... TRANSPORTATION Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... used by the railroads to adjust their gross annual operating revenues for classification purposes. This indexing methodology insures that railroads are classified based on real business expansion and not...

  12. 75 FR 57553 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... used by the railroads to adjust their gross annual operating revenues for classification purposes. This indexing methodology insures that railroads are classified based on real business expansion and not...

  13. 77 FR 34125 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... used by the railroads to adjust their gross annual operating revenues for classification purposes. This indexing methodology insures that railroads are classified based on real business expansion and not...

  14. 62. RAILROAD FACILITIES, TRUCKING PASSAGE, MAIL TRANSPORT AREA, ACCESS TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. RAILROAD FACILITIES, TRUCKING PASSAGE, MAIL TRANSPORT AREA, ACCESS TO POST OFFICE BUILDING, VIEW TO WEST - Terminal Tower Building, Cleveland Union Terminal, 50 Public Square, Cleveland, Cuyahoga County, OH

  15. 75 FR 66421 - HC Railroad, LLC-Acquisition and Operation Exemption-Honey Creek Railroad, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF TRANSPORTATION Surface Transportation Board HC Railroad, LLC--Acquisition and Operation Exemption--Honey Creek... 1150.31 to acquire from the Honey Creek Railroad (HCR), and to operate 6.4 miles of HCR's rail...

  16. 77 FR 50762 - Arkansas-Oklahoma Railroad, Inc.-Lease and Operation Exemption-Line of Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... Surface Transportation Board Arkansas-Oklahoma Railroad, Inc.--Lease and Operation Exemption-- Line of Union Pacific Railroad Company Arkansas-Oklahoma Railroad, Inc. (AOK), a Class III rail carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to lease from Union Pacific Railroad...

  17. 77 FR 38884 - Wyoming Connect Railroad LLC-Acquisition and Operation Exemption-Union Pacific Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Surface Transportation Board Wyoming Connect Railroad LLC--Acquisition and Operation Exemption--Union Pacific Railroad Company Wyoming Connect Railroad LLC (WCR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire by lease from Union Pacific Railroad Company and to...

  18. 75 FR 18254 - R.J. Corman Railroad Company/Bardstown Line-Lease and Operation Exemption-R.J. Corman Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... Surface Transportation Board R.J. Corman Railroad Company/Bardstown Line--Lease and Operation Exemption--R.J. Corman Railroad Property, LLC R.J. Corman Railroad Company/Bardstown Line (RJC Railroad Company... from R.J. Corman Railroad Property, LLC (RJC Railroad Property), and to operate approximately 42...

  19. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  20. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  1. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  2. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  3. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  4. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad operating employees in deadhead status...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.311 Railroad operating employees in deadhead status. (a) Notwithstanding any other restrictions...

  5. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad operating employees in deadhead status...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.311 Railroad operating employees in deadhead status. (a) Notwithstanding any other restrictions...

  6. 75 FR 6790 - Nebraska Northwestern Railroad, Inc.-Acquisition and Operation Exemption-Dakota, Minnesota...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... Surface Transportation Board Nebraska Northwestern Railroad, Inc.--Acquisition and Operation Exemption--Dakota, Minnesota & Eastern Railroad Corporation Nebraska Northwestern Railroad, Inc. (NNW), a noncarrier... Dakota, Minnesota & Eastern Railroad Corporation (DM&E) and to operate approximately 28.1 miles of...

  7. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... regulations and railroad operating rules. 220.43 Section 220.43 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS... regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  8. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad operating employees in deadhead status...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.311 Railroad operating employees in deadhead status. (a) Notwithstanding any other restrictions...

  9. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad operating employees in deadhead status...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.311 Railroad operating employees in deadhead status. (a) Notwithstanding any other restrictions...

  10. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad operating employees in deadhead status...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.311 Railroad operating employees in deadhead status. (a) Notwithstanding any other restrictions...

  11. 76 FR 28850 - Northern Plains Railroad, Inc.-Intra-Corporate Family Operation Exemption-Mohall Central Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... transaction within a corporate family of the type specifically exempted from prior review and approval under... Surface Transportation Board Northern Plains Railroad, Inc.--Intra-Corporate Family Operation Exemption... family. The transaction allows NPR to continue to operate the rail line of Mohall Central Railroad,...

  12. 76 FR 68523 - Utah Southern Railroad Company, LLC-Change in Operators Exemption-Iron Bull Railroad Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... Surface Transportation Board Utah Southern Railroad Company, LLC--Change in Operators Exemption--Iron Bull... of exemption under 49 CFR 1150.31 to change operators from Iron Bull Railroad Company (IBRC) to USRC... near Iron Springs, Utah, and milepost 14.7 at or near Iron Mountain, Utah, a distance of 14.6 miles...

  13. The Nevada railroad system: Physical, operational, and accident characteristics

    SciTech Connect

    1991-09-01

    This report provides a description of the operational and physical characteristics of the Nevada railroad system. To understand the dynamics of the rail system, one must consider the system`s physical characteristics, routing, uses, interactions with other systems, and unique operational characteristics, if any. This report is presented in two parts. The first part is a narrative description of all mainlines and major branchlines of the Nevada railroad system. Each Nevada rail route is described, including the route`s physical characteristics, traffic type and volume, track conditions, and history. The second part of this study provides a more detailed analysis of Nevada railroad accident characteristics than was presented in the Preliminary Nevada Transportation Accident Characterization Study (DOE, 1990).

  14. 77 FR 31067 - Cleveland Harbor Belt Railroad-Operation Exemption-Cleveland-Cuyahoga County Port Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Surface Transportation Board Cleveland Harbor Belt Railroad--Operation Exemption--Cleveland- Cuyahoga County Port Authority Cleveland Harbor Belt Railroad (CHB), a noncarrier, has filed a verified notice of... Commercial Railroad Company, LLC--Continuance in Control Exemption--Cleveland Harbor Belt Railroad, Docket...

  15. 77 FR 10617 - Wellsboro & Corning Railroad, LLC-Acquisition and Operation Exemption-Wellsboro & Corning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... Surface Transportation Board Wellsboro & Corning Railroad, LLC--Acquisition and Operation Exemption--Wellsboro & Corning Railroad Company Wellsboro & Corning Railroad, LLC (WCLLC), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Wellsboro & Corning Railroad Company...

  16. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... facilities on railroad conveyances. (a) Both kitchens and pantries of cars hereafter constructed...

  17. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... facilities on railroad conveyances. (a) Both kitchens and pantries of cars hereafter constructed...

  18. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... facilities on railroad conveyances. (a) Both kitchens and pantries of cars hereafter constructed...

  19. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... facilities on railroad conveyances. (a) Both kitchens and pantries of cars hereafter constructed...

  20. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... facilities on railroad conveyances. (a) Both kitchens and pantries of cars hereafter constructed...

  1. 76 FR 21425 - Rocky Mountain Railcar and Repair, Inc.-Acquisition and Operation Exemption-Line of Railroad in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... Surface Transportation Board Rocky Mountain Railcar and Repair, Inc.--Acquisition and Operation Exemption--Line of Railroad in Tooele County, UT Rocky Mountain Railcar and Repair, Inc. (Rocky Mountain), a... line. \\1\\ Rocky Mountain states that it currently operates a railcar repair facility, but that it...

  2. Mutual design: Overhead transmission lines and railroad facilities: Susceptibility program: Final report

    SciTech Connect

    Frazier, M.J.; Little, D.R.

    1989-07-01

    The sharing of common corridors by electric power transmission lines and railroad facilities can result in the coupling of unwanted electromagnetic energy from the power lines into nearby railroad systems. The coupling can result in voltage being induced onto the railroad system conductors that may compromise the inherent safety and reliability of the railroad signalling system. This broad-scoped research program, which is co-sponsored by EPRI and the AAR, is addressing the problem from two directions. This two volume report describes a Phase 1 effort to develop the methods and techniques for quantifying the signal system response to interference. 54 figs., 7 tabs.

  3. 75 FR 68398 - Texas, Oklahoma & Eastern Railroad, LLC-Acquisition and Operation Exemption-Texas, Oklahoma...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... Surface Transportation Board Texas, Oklahoma & Eastern Railroad, LLC--Acquisition and Operation Exemption--Texas, Oklahoma & Eastern Railroad Company Texas, Oklahoma & Eastern Railroad, LLC (TOE), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Texas,...

  4. 77 FR 19417 - Affton Terminal Railroad Company-Operation Exemption1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... TRANSPORTATION Surface Transportation Board Affton Terminal Railroad Company--Operation Exemption\\1\\--Affton Trucking Company Affton Terminal Railroad Company (ATRR), a noncarrier, has filed a verified notice of... related products with the Terminal Railroad Association of St. Louis and BNSF Railway Company and...

  5. 77 FR 27857 - Kingman Terminal Railroad, LLC-Operation Exemption-Kingman Airport Authority, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... Surface Transportation Board Kingman Terminal Railroad, LLC--Operation Exemption--Kingman Airport Authority, Inc. Kingman Terminal Railroad, LLC (KTRR), a noncarrier, has filed a verified notice of....--Continuance in Control Exemption--Kingman Terminal Railroad, LLC, Docket No. FD 35619, wherein...

  6. 76 FR 39156 - R. J. Corman Railroad Company/Bardstown Line-Lease and Operation Exemption-R. J. Corman Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... Register on April 9, 2010 (75 FR 18,254), and became effective on April 25, 2010. On May 28, 2010, RJC... Surface Transportation Board R. J. Corman Railroad Company/Bardstown Line--Lease and Operation Exemption--R. J. Corman Railroad Property, LLC R. J. Corman Railroad Company/Bardstown Line (RJC...

  7. 75 FR 7152 - Stillwater Central Railroad, Inc.-Lease and Operation Exemption-Hollis & Eastern Railroad L.L.C.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Stillwater Central Railroad, Inc.--Lease and Operation Exemption--Hollis... verified notice of exemption under 49 CFR 1150.41 to lease and to operate, pursuant to a lease...

  8. 76 FR 27173 - Carolina Coastal Railway, Inc.-Acquisition and Operation Exemption-Rocky Mount & Western Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... Surface Transportation Board Carolina Coastal Railway, Inc.--Acquisition and Operation Exemption--Rocky Mount & Western Railroad Co., Inc. d/b/a Nash County Railroad Carolina Coastal Railway, Inc. (CLNA), a... Rocky Mount & Western Railroad Co., Inc. d/b/a Nash County Railroad (NCR), and to operate,...

  9. 78 FR 54955 - Mississippi Central Railroad Co.-Lease and Change in Operators Exemption-Line of Mississippi...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... Surface Transportation Board Mississippi Central Railroad Co.--Lease and Change in Operators Exemption--Line of Mississippi-Alabama Railroad Authority Mississippi Central Railroad Co. (MSCI), a Class III...-mile line of railroad between milepost IC-529.5 (Corinth, Miss.) and milepost IC-571.0 (Red Bay,...

  10. 77 FR 65446 - Turtle Creek Industrial Railroad, Inc.-Acquisition and Operation Exemption-Consolidated Rail...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Turtle Creek Industrial Railroad, Inc.--Acquisition and Operation Exemption--Consolidated Rail Corporation Turtle Creek Industrial Railroad, Inc. (TCKR), a noncarrier and a wholly...

  11. 76 FR 22746 - Wiregrass Central Railway, LLC-Acquisition and Operation Exemption-Wiregrass Central Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Surface Transportation Board Wiregrass Central Railway, LLC--Acquisition and Operation Exemption--Wiregrass Central Railroad Company, Inc. Wiregrass Central Railway, LLC (WCR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Wiregrass Central Railroad Company,...

  12. 77 FR 38884 - Sisseton Milbank Railroad Company-Acquisition and Operation Exemption-SLA Property Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Surface Transportation Board Sisseton Milbank Railroad Company--Acquisition and Operation Exemption--SLA... or near Milbank and approximate railroad milepost 38.0 in or near Sisseton, in Grant and Roberts... the Trust in the near future. The parties expect to consummate the transaction on or after July...

  13. 75 FR 82426 - Big Four Terminal Railroad, LLC-Operation Exemption-RMW Ventures, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Big Four Terminal Railroad, LLC--Operation Exemption--RMW Ventures, LLC Big Four Terminal Railroad, LLC (BFTR), has filed a verified notice of exemption under 49 CFR 1150.31...

  14. 76 FR 13445 - Lycoming Valley Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Lycoming Valley Railroad Company-Operation Exemption--SEDA--COG Joint Rail Authority Lycoming Valley Railroad Company (LVRR), a Class III carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to...

  15. 76 FR 13445 - North Shore Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board North Shore Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority North Shore Railroad Company (NSRR), a Class III carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to...

  16. 76 FR 13446 - Juniata Valley Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Juniata Valley Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority Juniata Valley Railroad Company (JVRR), a Class III carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to...

  17. Mutual design: Overhead Transmission Lines and Railroad Facilities Susceptibility Program, Phase 2: Volume 1, Railroad track interference-susceptibility tester design and testing; Volume 2, Set-up and LFETC test plan; Volume 3, Fabrication information. Final report

    SciTech Connect

    Frazier, M.J.; Little, D.R.

    1995-09-01

    The sharing of corridors by electric power-transmission lines and railroad facilities results in coupling of electromagnetic energy from the power lines into nearby railroad systems. This electromagnetic coupling can induce voltage levels onto the railroad signaling system that can adversely affect the operation of these systems. The development and rapid deployment of sophisticated solid-state electronic track-signaling systems and the continued increase in demand for power will make this problem more serious, as additional joint railroad/electricutility common corridors will be needed and as power-system upgrades for existing corridors will be initiated. This three-volume report describes the development of a laboratory railroad-track simulator/interference-susceptibility tester. This simulator permits track-circuit signaling and grade-crossing systems to be tested in the laboratory to determine their susceptibility to power-line interference that is coupled to the rails for a wide range of realistic normal and abnormal signal-system operating conditions, block-length arrangements, and interference conditions. The simulator provides an accurate electrical analogue of the track system, including frequency-dependent rail skin-effect impedance, signal attenuation, and controlled-ballast variation. The simulator can be used to investigate the effects of both longitudinal and differential interference excitation of the rails.

  18. 75 FR 45011 - Gardendale Railroad, Inc.-Operation Exemption-Rail Line of Border Transload & Transfer, Inc. at...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    .... (BTT) (formerly known as Texas Railroad Switching, Inc. (TRS)).\\1\\ \\1\\ In 1990, CCR received an exemption to acquire a 53.41-mile line of railroad and TRS received an exemption to lease and operate...

  19. 75 FR 63532 - Lancaster & Chester Railroad, LLC-Acquisition and Operation Exemption-Line of Lancaster & Chester...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Surface Transportation Board Lancaster & Chester Railroad, LLC--Acquisition and Operation Exemption--Line of Lancaster & Chester Railway Company Lancaster & Chester Railroad, LLC (L&C Railroad), a noncarrier... miles of rail line owned by Class III rail carrier Lancaster & Chester Railway Company as follows:...

  20. 78 FR 24465 - Ballard Terminal Railroad Company, L.L.C.-Acquisition and Operation Exemption-Woodinville...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... Surface Transportation Board Ballard Terminal Railroad Company, L.L.C.--Acquisition and Operation...; request for comments. SUMMARY: On April 2, 2013, Ballard Terminal Railroad Company, L.L.C. (Ballard), a... the Line at issue here. Ballard Terminal Railroad Company, L.L.C.--Lease Exemption--Line of...

  1. 77 FR 14058 - Santa Teresa Southern Railroad, LLC-Operation Exemption-Rail Line of Verde Logistics Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... Logistics Railroad, LLC at Santa Teresa, Dona Ana County, NM Santa Teresa Southern Railroad, LLC (STSR), a... feet of rail line owned by Verde Logistics Railroad, LLC (Verde). The rail line extends between a point... to shippers and receivers located in the Santa Teresa Logistics Industrial Park. \\1\\ STSR states...

  2. 76 FR 5649 - Tongue River Railroad Company, Inc.-Construction and Operation-Western Alignment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... Surface Transportation Board Tongue River Railroad Company, Inc.--Construction and Operation-- Western... Montana. A final decision authorizing TRRC's construction and operation was issued in October, 2007. The... process. The Tribes are concerned about impacts related to the rail line construction and operation...

  3. 76 FR 77890 - Swan Ranch Railroad, L.L.C.-Operation Exemption-Swan Industrial Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Swan Ranch Railroad, L.L.C.--Operation Exemption--Swan Industrial Park Swan... located within the Swan Industrial Park, in Cheyenne, Wyo. The track over which SRR will operate...

  4. 75 FR 11991 - ABC & D Recycling, Inc.-Lease and Operation Exemption-a Line of Railroad in Ware, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... Surface Transportation Board ABC & D Recycling, Inc.--Lease and Operation Exemption--a Line of Railroad in... under 49 CFR 1150.31 to lease from O'Riley Family Trust (O'Riley), and to operate 773 feet of rail line... lease and operate the railroad trackage owned by O'Riley. ABC & D states that it has and intends...

  5. 78 FR 24803 - Hilco SP Rail, LLC-Acquisition and Operation Exemption-RG Steel Railroad Holding, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... Surface Transportation Board Hilco SP Rail, LLC--Acquisition and Operation Exemption--RG Steel Railroad Holding, LLC Hilco SP Rail, LLC (Hilco), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from RG Steel Railroad Holding, LLC, and operate as a common carrier over...

  6. 76 FR 22745 - Three Notch Railway, LLC-Acquisition and Operation Exemption-Three Notch Railroad Co., Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Surface Transportation Board Three Notch Railway, LLC--Acquisition and Operation Exemption-- Three Notch Railroad Co., Inc. Three Notch Railway, LLC (TNRW), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Three Notch Railroad Co., Inc. (TNHR) and to operate...

  7. 78 FR 41994 - RSL Railroad LLC-Operation Exemption-Massillon Energy & Technology Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board RSL Railroad LLC--Operation Exemption--Massillon Energy & Technology Park On... milepost 1.27 (the Line), pursuant to an agreement with Massillon Energy & Technology Park (Massillon),...

  8. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  9. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  10. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  11. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  12. 78 FR 30965 - AG Valley Railroad, LLC-Operation Exemption-Ag Valley Holdings, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board AG Valley Railroad, LLC--Operation Exemption--Ag Valley Holdings, LLC AG... original and 10 copies of all pleadings, referring to Docket No. FD 35736, must be filed with the...

  13. 75 FR 59579 - Restrictions on Railroad Operating Employees' Use of Cellular Telephones and Other Electronic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... 19 percent tend to pull over to a stop to place the call. Ten percent stated they never dial while... electronic devices by railroad operating employees. 75 FR 27672 (May 18, 2010). The NPRM proposed to codify many of the requirements of Emergency Order 26 (Order or EO 26, 73 FR 58702 (Oct. 7, 2008)),...

  14. 76 FR 15047 - Port of Ivory, LLC-Operation Exemption-Line of Railroad in Tulare County, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... Surface Transportation Board Port of Ivory, LLC--Operation Exemption--Line of Railroad in Tulare County, CA Port of Ivory, LLC (Port), a limited liability company and noncarrier, has filed a verified notice... Valley Railroad Company (SJVR) at a point known as Ivory (milepost 232.3 on SJVR's Exeter...

  15. 76 FR 13446 - Nittany Bald and Eagle Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Surface Transportation Board Nittany Bald and Eagle Railroad Company-Operation Exemption-SEDA- COG Joint Rail Authority Nittany Bald and Eagle Railroad Company (N&BE), a Class III carrier, has filed a... the Board in Susquehanna Union R.R.-Control Exemption- N. Shore R.R., Nittany & Bald Eagle...

  16. 75 FR 61817 - Jackson & Lansing Railroad Company-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Surface Transportation Board Jackson & Lansing Railroad Company--Lease and Operation Exemption--Norfolk Southern Railway Company Under 49 CFR 1011.7(b)(10), the Director of the Office of Proceedings (Director... & Lansing Railroad Company (JAIL), a noncarrier, has filed a verified notice of exemption under 49 CFR...

  17. 76 FR 22746 - Conecuh Valley Railway, LLC-Acquisition and Operation Exemption-Conecuh Valley Railroad Co., Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Surface Transportation Board Conecuh Valley Railway, LLC--Acquisition and Operation Exemption--Conecuh Valley Railroad Co., Inc. Conecuh Valley Railway, LLC (CVR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Conecuh Valley Railroad Co., Inc. (COEH), and to...

  18. 76 FR 12224 - Autauga Northern Railroad, L.L.C.-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Surface Transportation Board Autauga Northern Railroad, L.L.C.--Lease and Operation Exemption--Norfolk Southern Railway Company Autauga Northern Railroad, L.L.C. (ANRR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire by lease from Norfolk Southern Railway Company...

  19. 75 FR 7537 - Elkhart & Western Railroad Co.-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... Surface Transportation Board Elkhart & Western Railroad Co.--Lease and Operation Exemption-- Norfolk Southern Railway Company Elkhart & Western Railroad Co. (EWR), a Class III rail carrier,\\1\\ has filed a... (Agreement) \\2\\ with Norfolk Southern Railway Company (NSR), approximately 23.0 miles of NSR's rail...

  20. 78 FR 802 - Heart of Texas Railroad, L.P.-Acquisition and Operation Exemption-Gulf Colorado & San Saba...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... Surface Transportation Board Heart of Texas Railroad, L.P.--Acquisition and Operation Exemption--Gulf Colorado & San Saba Railway Company Heart of Texas Railroad, L.P. (the Company), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Gulf Colorado & San Saba Railway...

  1. 76 FR 75602 - Hilton & Albany Railroad, Inc.-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... TRANSPORTATION Surface Transportation Board Hilton & Albany Railroad, Inc.--Lease and Operation Exemption-- Norfolk Southern Railway Company Hilton & Albany Railroad, Inc. (HAL), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to lease from Norfolk Southern Railway Company (NSR) and...

  2. 76 FR 16654 - Austin Western Railroad, L.L.C.-Lease and Operation Exemption-Capital Metropolitan Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Austin Western Railroad, L.L.C.--Lease and Operation Exemption-- Capital Metropolitan Transportation Authority Austin Western Railroad, L.L.C. (AWRR), a Class III rail carrier,...

  3. 78 FR 338 - Buckeye Hammond Railroad, L.L.C.; Acquisition and Operation Exemption; Buckeye Partners, L.P.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-03

    ... Surface Transportation Board Buckeye Hammond Railroad, L.L.C.; Acquisition and Operation Exemption; Buckeye Partners, L.P. Buckeye Hammond Railroad, L.L.C. (BHRR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 \\1\\ to acquire from Buckeye Partners, L.P., a noncarrier, and...

  4. 77 FR 55268 - Union Pacific Railroad Company-Acquisition and Operation Exemption-San Pedro Railroad Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ..., LLC's (SPROC) line segments between MP 1040.15 at Curtiss, Ariz., and MP 1041.32 near Curtiss (Parcel... property rights, including SPROC's freight operating easement, in a line segment between MP 1041.32 and...

  5. 77 FR 72907 - Western Washington Railroad, LLC-Lease and Operation Exemption-City of Tacoma, Department of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ...-- City of Tacoma, Department of Public Works On November 20, 2012, Western Washington Railroad, LLC (WWRR... CFR 1150.31 to lease from the City of Tacoma, Department of Public Works (Tacoma Rail) and operate...

  6. 76 FR 75600 - Port Rail Link, Inc.-Acquisition and Operation Exemption-Rail Lines of Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Union Pacific Railroad Company and The Lake Charles Harbor and Terminal District Port Rail Link, Inc... Harbor and Terminal District (the District), operator ] of the Port of Lake Charles (the Port),...

  7. 78 FR 36017 - MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-Operation Exemption-Hilco SP Rail, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... Railroad Holding, LLC, FD 35734 (STB served Apr. 26, 2013); 78 FR 24,803 (Apr. 26, 2013). MCM's notice was... Surface Transportation Board MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-- Operation Exemption--Hilco SP Rail, LLC MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad (MCM), a...

  8. Designing Facilities for Collaborative Operations

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey; Powell, Mark; Backes, Paul; Steinke, Robert; Tso, Kam; Wales, Roxana

    2003-01-01

    A methodology for designing operational facilities for collaboration by multiple experts has begun to take shape as an outgrowth of a project to design such facilities for scientific operations of the planned 2003 Mars Exploration Rover (MER) mission. The methodology could also be applicable to the design of military "situation rooms" and other facilities for terrestrial missions. It was recognized in this project that modern mission operations depend heavily upon the collaborative use of computers. It was further recognized that tests have shown that layout of a facility exerts a dramatic effect on the efficiency and endurance of the operations staff. The facility designs (for example, see figure) and the methodology developed during the project reflect this recognition. One element of the methodology is a metric, called effective capacity, that was created for use in evaluating proposed MER operational facilities and may also be useful for evaluating other collaboration spaces, including meeting rooms and military situation rooms. The effective capacity of a facility is defined as the number of people in the facility who can be meaningfully engaged in its operations. A person is considered to be meaningfully engaged if the person can (1) see, hear, and communicate with everyone else present; (2) see the material under discussion (typically data on a piece of paper, computer monitor, or projection screen); and (3) provide input to the product under development by the group. The effective capacity of a facility is less than the number of people that can physically fit in the facility. For example, a typical office that contains a desktop computer has an effective capacity of .4, while a small conference room that contains a projection screen has an effective capacity of around 10. Little or no benefit would be derived from allowing the number of persons in an operational facility to exceed its effective capacity: At best, the operations staff would be underutilized

  9. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  10. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  11. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  12. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  13. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  14. 75 FR 49549 - ABC & D Recycling, Inc.-Lease and Operation Exemption-a Line of Railroad in Ware, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... Surface Transportation Board ABC & D Recycling, Inc.--Lease and Operation Exemption--a Line of Railroad in Ware, MA ABC & D Recycling, Inc. (ABC & D), a noncarrier, has filed a verified notice of exemption... operation of this trackage in FD 35356, ABC & D Recycling, Inc.--Lease and Operation Exemption--a Line...

  15. 76 FR 42163 - East Penn Railroad, L.L.C.; Lease and Operation Exemption; Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... Surface Transportation Board East Penn Railroad, L.L.C.; Lease and Operation Exemption; Norfolk Southern... delegated the authority to determine whether to issue notices of exemption for lease transactions under 49 U... has determined that this lease and operation notice of exemption should be issued, and does so...

  16. 75 FR 12594 - Alaska Railroad Corporation-Construction and Operation Exemption-A Rail Line Extension to Port...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... Surface Transportation Board Alaska Railroad Corporation--Construction and Operation Exemption--A Rail... rail service to the Port MacKenzie area, and would include construction of related structures, such as communications towers and sidings. Because construction and operation of this proposed rail line has...

  17. 77 FR 69928 - Transco Railway Products Inc.-Acquisition and Operation Exemption-D&W Railroad LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    ... Surface Transportation Board Transco Railway Products Inc.--Acquisition and Operation Exemption--D&W... exemption under 49 CFR 1150.31 to acquire from D&W Railroad LLC (D&W) and to operate approximately 23 miles...&W main line, which segments include three parallel tracks northeast of the Stub-ended...

  18. 76 FR 72752 - Alaska Railroad Corporation-Construction and Operation Exemption-A Rail Line Extension to Port...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... Surface Transportation Board Alaska Railroad Corporation--Construction and Operation Exemption--A Rail... construction and operation exemption. SUMMARY: The Board is granting an exemption under 49 U.S.C. 10502 from... to environmental mitigation conditions and the condition that ARRC build the route designated...

  19. Operating Costs of Educational Facilities.

    ERIC Educational Resources Information Center

    Isler, Norman P.

    The references included were drawn from the documents received and processed to date by the ERIC Clearinghouse on Educational Facilities, and are organized into the following sections--(1) school business, (2) maintenance and operations, (3) insurance programs, (4) property accounting, (5) purchasing, and (6) food service. (FS)

  20. 77 FR 56266 - CSX Transportation, Inc.-Acquisition of Operating Easement-Grand Trunk Western Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-12

    ...CSX Transportation, Inc. (CSXT) and Grand Trunk Western Railroad Company (GTW) have agreed to exchange perpetual rail operating easements over certain parts of each other's lines. GTW has agreed to grant CSXT an easement over a GTW line between Munster, Ind., and Elsdon, Ill. (Elsdon Line), over which GTW would retain local and overhead trackage rights. CSXT also has agreed to convey local and......

  1. 77 FR 30588 - R.J. Corman Railroad Company/Pennsylvania Lines Inc.-Construction and Operation Exemption-In...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board R.J. Corman Railroad Company/Pennsylvania Lines Inc.-- Construction and... construction and operation exemption. SUMMARY: The Board grants an exemption under 49 U.S.C. 10502 from...

  2. 77 FR 33560 - Woodland Rail, LLC-Acquisition and Operation Exemption-Line of Maine Central Railroad Co.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... Surface Transportation Board Woodland Rail, LLC--Acquisition and Operation Exemption--Line of Maine Central Railroad Co. Woodland Rail, LLC (Woodland Rail), a noncarrier, has filed a verified notice of..., Canada. As Woodland Rail acknowledges in its notice, the jurisdiction of the Board only extends to...

  3. 77 FR 74548 - Michigan Southern Railroad Company-Acquisition and Operation Exemption-RMW Ventures, LLC and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Michigan Southern Railroad Company--Acquisition and Operation Exemption--RMW... pleadings, referring to Docket No. FD 35696, must be filed with the Surface Transportation Board, 395...

  4. 77 FR 49863 - Pacific Imperial Railroad, Inc.-Change in Operator Exemption-Rail Line of San Diego and Arizona...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Pacific Imperial Railroad, Inc.--Change in Operator Exemption-- Rail Line of... original and 10 copies of all pleadings, referring to Docket No. FD 35657, must be filed with the...

  5. 78 FR 60374 - Allentown and Auburn Railroad Company, Inc.-Change in Operators Exemption-Rail Line of Kutztown...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Allentown and Auburn Railroad Company, Inc.--Change in Operators Exemption... filed with the Surface Transportation Board, 395 E Street SW., Washington, DC 20423-0001. In...

  6. 77 FR 71872 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Tongue River Railroad Company, Inc.--Rail Construction and Operation--in Custer, Powder River and Rosebud Counties, MT; Extension of Comment Period for the Draft Scope of...

  7. 77 FR 66663 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Tongue River Railroad Company, Inc.--Rail Construction and Operation--in Custer, Powder River and Rosebud Counties, MT.; Correction to the Notice of Intent To Prepare...

  8. 77 FR 67863 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Tongue River Railroad Company, Inc.--Rail Construction and Operation--in Custer, Powder River and Rosebud Counties, Montana: Update to the Notice of Intent to Prepare...

  9. 75 FR 74768 - Madison Terminal Railway, LLC-Lease and Operation Exemption-Line of Railroad in Dane County, WI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Madison Terminal Railway, LLC--Lease and Operation Exemption-- Line of Railroad in Dane County, WI Madison Terminal Railway, LLC (MTR), a noncarrier, has filed a verified...

  10. Facility design, construction, and operation

    SciTech Connect

    1995-04-01

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l`Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l`Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, including uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec`s contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides` all of the basic information in these areas and reflects actual experience to date.

  11. PROJECTIZING AN OPERATING NUCLEAR FACILITY

    SciTech Connect

    Adams, N

    2007-07-08

    This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully

  12. 77 FR 12366 - JP Rail, Inc. d/b/a Southern Railroad Company of New Jersey-Operation Exemption-Rail Line in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board JP Rail, Inc. d/b/a Southern Railroad Company of New Jersey-- Operation Exemption--Rail Line in Salem County, N.J. JP Rail, Inc. d/b/a Southern Railroad Company of New Jersey (JP Rail), a Class III rail carrier,...

  13. 75 FR 25310 - Port Harbor Railroad, Inc.-Lease and Operation Exemption-Line of Tri-City Regional Port District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Surface Transportation Board Port Harbor Railroad, Inc.--Lease and Operation Exemption--Line of Tri-City Regional Port District Port Harbor Railroad, Inc. (Port Harbor), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to lease from Tri- City Regional Port District (Tri-City), and...

  14. 75 FR 16005 - Drawbridge Operation Regulation; Port of Coos Bay Railroad Bridge, Coos Bay, North Bend, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ...The Coast Guard is changing the drawbridge operation regulation for the Coos Bay Railroad Bridge, Coos Bay, mile 9.0, at North Bend, Oregon to delete the requirement for special sound signals used in foggy weather and to change the name of the owner. The change is necessary to make the sound signals used at the bridge consistent with other bridges in the area and to eliminate the unnecessary......

  15. The highway and railroad operating environments for hazardous shipments in the U.S.-safer in the '90s?

    SciTech Connect

    Saricks, C. L.; Tompkins, M. M.

    2000-04-01

    This paper seeks to illuminate the status of transportation safety and risk for large-quantity shipments of spent commercial reactor fuel and mixed and hazardous wastes by examining road and rail accident and vehicular travel data from the mid-1990s. Of special interest are the effect of speed limit changes on controlled-access expressways (chiefly the Interstate Highway System) and the possible effect of season-to-season climatic variation on road transport. We found that improvements in railroad technology and infrastructure have created a safer overall operating environment for railroad freight shipments. We also found recent evidence of an increase in accident rates of heavy combination trucks in states that have raised highway speed limits. Finally, cold weather increases road transport risk, while conditions associated with higher ambient temperatures do not. This last finding is in contrast to rail transport, for which the literature associates both hot and cold temperature extremes with higher accident rates.

  16. National facilities study. Volume 4: Space operations facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The principal objectives of the National Facilities Study (NFS) were to: (1) determine where U.S. facilities do not meet national aerospace needs; (2) define new facilities required to make U.S. capabilities 'world class' where such improvements are in the national interest; (3) define where consolidation and phase-out of existing facilities is appropriate; and (4) develop a long-term national plan for world-class facility acquisition and shared usage. The Space Operations Facilities Task Group defined discrete tasks to accomplish the above objectives within the scope of the study. An assessment of national space operations facilities was conducted to determine the nation's capability to meet the requirements of space operations during the next 30 years. The mission model used in the study to define facility requirements is described in Volume 3. Based on this model, the major focus of the Task Group was to identify any substantive overlap or underutilization of space operations facilities and to identify any facility shortfalls that would necessitate facility upgrades or new facilities. The focus of this initial study was directed toward facility recommendations related to consolidations, closures, enhancements, and upgrades considered necessary to efficiently and effectively support the baseline requirements model. Activities related to identifying facility needs or recommendations for enhancing U.S. international competitiveness and achieving world-class capability, where appropriate, were deferred to a subsequent study phase.

  17. Data Management Facility Operations Plan

    SciTech Connect

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  18. CONNECTICUT RAILROAD

    EPA Science Inventory

    This is a 1:24,000-scale datalayer that includes all of the railroads that appear on the U.S. Geological Survey (USGS) 7½ minute topographic quadrangle maps that cover the State of Connecticut. It includes railroad tracks, sidings, underpasses, stations, etc. Since this datalaye...

  19. Operating procedures: Fusion Experiments Analysis Facility

    SciTech Connect

    Lerche, R.A.; Carey, R.W.

    1984-03-20

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility.

  20. Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Drury, Douglas D.

    1978-01-01

    Presents the 1978 literature review of wastewater treatment: (1) operators, training, and certification; (2) solutions to operating problems; (3) collection systems; (4) operations manuals; (5) wastewater treatment facility case histories; (5) land application; and (6) treatment of industrial wastes. A list of 36 references is also presented. (HM)

  1. APPA's New Operational Guidelines for Educational Facilities

    ERIC Educational Resources Information Center

    Bigger, Alan S.

    2011-01-01

    Nearly 25 years ago a group of APPA members and facilities managers started to discuss an idea and to plant a seed about the need for a document, or series of documents, that would explain the need for staffing facilities operations and the implication of such staffing on levels of service. As the demand for increased budget cuts reached seismic…

  2. Railroad deregulation: impact on coal

    SciTech Connect

    Tukenmez, E.

    1983-08-01

    Recent railroad legislation exemplified by the Staggers Rail Act has aimed generally at improving the profitability of the railroads through pricing flexibility and operating changes. The evolution of railroad legislation through the 1970's has indicated a concern about the revenue adequacy of the railroads and the regulatory burden under which the railroads were forced to operate for many years. Over the past two-and-a-half years the railroads generally have been pleased with the results of the Staggers Act. Coal producers and consumers, however, are dissatisfied with the ICC's implementation of the Act. In April 1982, bills were introduced in Congress to clarify provisions of the Staggers Act dealing with market dominance, revenue adequacy, and establishment of coal rate guidelines, in order to protect captive shippers.

  3. 77 FR 18881 - North Louisiana & Arkansas Railroad, Inc.-Lease and Operation Exemption-Line of Southeastern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ...--Line of Southeastern Arkansas Economic Development District North Louisiana & Arkansas Railroad, Inc... from Southeastern Arkansas Economic Development District (SAEDD), a noncarrier political subdivision...

  4. 78 FR 13932 - Yellowstone Valley Railroad, L.L.C.-Discontinuance of Lease and Trackage Rights Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-01

    ... Surface Transportation Board Yellowstone Valley Railroad, L.L.C.--Discontinuance of Lease and Trackage... County, ND On February 11, 2013, Yellowstone Valley Railroad, L.L.C. (YVRR) \\1\\ filed with the Surface...) between: (1) Milepost 43.0, in Crane, Mont., and milepost 78.6, near Snowden, Mont.; and (2) milepost...

  5. The Cngs Facility:. Performance and Operational Experience

    NASA Astrophysics Data System (ADS)

    Gschwendtner, Edda; Cornelis, Karel; Efthymiopoulos, Ilias; Ferrari, Alfredo; Pardons, Ans; Vincke, Heinz; Wenninger, Joerg; Sala, Paola; Guglielmi, Alberto

    2010-04-01

    The CNGS facility (CERN Neutrinos to Gran Sasso) aims at directly detecting muon to tau neutrino oscillations. An intense muon-neutrino beam (1E17 muon neutrinos/day) is generated at CERN and directed over 732 km towards the Gran Sasso National Laboratory, LNGS, in Italy, where two large and complex detectors, OPERA and ICARUS, are located. CNGS is the first long-baseline neutrino facility in which the measurement of the oscillation parameters is performed by observation of tau-neutrino appearance. In this paper, an overview of the CNGS facility is presented. The experience gained in operating this 500 kW neutrino beam facility is described. Major events since the commissioning of the facility in 2006 are summarized. Highlights on CNGS beam performance since the start of physics run in 2008 are given.

  6. 78 FR 69746 - Buckeye Railroad Holdings, LLC-Continuance in Control-Buckeye Hammond Railroad, LLC, and Buckeye...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... Railroad, LLC, and Buckeye East Chicago Railroad, LLC Buckeye Railroad Holdings, LLC (BRH), has filed a..., LLC (BHRR), and Buckeye East Chicago Railroad, LLC (BECRR), both Class III rail carriers. In November... right-of-way, and bulk liquid transloading facilities in East Chicago, Ind. Buckeye E. Chi....

  7. Defense waste processing facility radioactive operations. Part 1 - operating experience

    SciTech Connect

    Little, D.B.; Gee, J.T.; Barnes, W.M.

    1997-12-31

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation`s first and the world`s largest vitrification facility. Following a ten year construction program and a 3 year non-radioactive test program, DWPF began radioactive operations in March 1996. This paper presents the results of the first 9 months of radioactive operations. Topics include: operations of the remote processing equipment reliability, and decontamination facilities for the remote processing equipment. Key equipment discussed includes process pumps, telerobotic manipulators, infrared camera, Holledge{trademark} level gauges and in-cell (remote) cranes. Information is presented regarding equipment at the conclusion of the DWPF test program it also discussed, with special emphasis on agitator blades and cooling/heating coil wear. 3 refs., 4 figs.

  8. Defense Waste Processing Facility -- Radioactive operations -- Part 3 -- Remote operations

    SciTech Connect

    Barnes, W.M.; Kerley, W.D.; Hughes, P.D.

    1997-06-01

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, South Carolina is the nation`s first and world`s largest vitrification facility. Following a ten year construction period and nearly three years of non-radioactive testing, the DWPF began radioactive operations in March 1996. Radioactive glass is poured from the joule heated melter into the stainless steel canisters. The canisters are then temporarily sealed, decontaminated, resistance welded for final closure, and transported to an interim storage facility. All of these operations are conducted remotely with equipment specially designed for these processes. This paper reviews canister processing during the first nine months of radioactive operations at DWPF. The fundamental design consideration for DWPF remote canister processing and handling equipment are discussed as well as interim canister storage.

  9. Operating large controlled thermonuclear fusion research facilities

    SciTech Connect

    Gaudreau, M.P.J.; Tarrh, J.M.; Post, R.S.; Thomas, P.

    1987-10-01

    The MIT Tara Tandem Mirror is a large, state of the art controlled thermonuclear fusion research facility. Over the six years of its design, implementation, and operation, every effort was made to minimize cost and maximize performance by using the best and latest hardware, software, and scientific and operational techniques. After reviewing all major DOE fusion facilities, an independent DOE review committee concluded that the Tara operation was the most automated and efficient of all DOE facilities. This paper includes a review of the key elements of the Tara design, construction, operation, management, physics milestones, and funding that led to this success. We emphasize a chronological description of how the system evolved from the proposal stage to a mature device with an emphasis on the basic philosophies behind the implementation process. This description can serve both as a qualitative and quantitative database for future large experiment planning. It includes actual final costs and manpower spent as well as actual run and maintenance schedules, number of data shots, major system failures, etc. The paper concludes with recommendations for the next generation of facilities. 13 refs., 15 figs., 3 tabs.

  10. 75 FR 1447 - Alaska Railroad Corporation-Construction and Operation Exemption-Rail Line Between North Pole and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... Between North Pole and Delta Junction, AK By petition filed on July 6, 2007, Alaska Railroad Corporation... side of the community of Delta Junction. In a decision served on October 4, 2007, the Board...

  11. Recent operational experiments at the LANSCE facility

    SciTech Connect

    Rybarcyk, Lawrence J

    2010-09-15

    The Los Alamos Neutron Science Center (LANSCE) consists of a pulsed 800-MeV room-temperature linear accelerator and an 800-MeV accumulator ring. It simultaneously provides H{sup +} and H{sup -} beams to several user facilities that have their own distinctive requirements, e.g. intensity, chopping pattern, duty factor, etc.. This multibeam operation presents challenges both from the standpoint of meeting the individual requirements but also achieving good overall performance for the integrated operation. Various aspects of more recent operations including the some of these challenges will be discussed.

  12. 77 FR 74548 - North Shore Railroad Company-Acquisition and Operation Exemption-PPL Susquehanna, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... decision, North Shore stated that it provided common carrier rail service on the Line. In any event, North Shore will not become an authorized common carrier with respect to the Line until the effective date of... subsidiary of PPL Generation, LLC, is the operator of the power plant served by the Line and owns a...

  13. 75 FR 24400 - Drawbridge Operation Regulation; CSX Railroad, Trout River, Mile 0.9, Jacksonville, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ..., Jacksonville, FL in the Federal Register (74 FR 106). We received no comments on the proposed rule. No public..., mile 0.9, Jacksonville, Florida. This rule will allow the bridge to operate using an automated system...@uscg.mil , Seventh Coast Guard District, Bridge Branch, 909 S.E. 1st Ave., Miami, FL 33131,...

  14. Government and the midwest railroads: notes on the demise of the Chicago, Rock Island and Pacific Railroad Company

    SciTech Connect

    Ingram, J.W.

    1980-01-01

    The Chicago, Rock Island and Pacific Railroad Co. declared bankruptcy in 1975. Reorganization efforts after entering bankruptcy are reported. The company sought federal and private funds and revamped its operating procedures to reduce the capital intensiveness of railroad activities. Railroad labor unions balked at the company's new policy to reduce personnel in order to operate a light-density railroad. Strikes created more cash flow problems, and the federal government directed another railroad company to take over operations of the line. Such federal favoring of unions over railroads poses a bleak future for the future maintenance of individual railroad companies.

  15. Sulphite Railroad Bridge1896, Title Sheet Sulphite Railroad Bridge, Former ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Sulphite Railroad Bridge-1896, Title Sheet - Sulphite Railroad Bridge, Former Boston & Maine Railroad (originally Tilton & Franklin Railroad) spanning Winnipesautee River, Franklin, Merrimack County, NH

  16. 75 FR 54543 - Changes to NARA Facilities' Hours of Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... of Operation AGENCY: National Archives and Records Administration. ACTION: Proposed rule. SUMMARY... provide NARA facilities' hours of operation. The proposed regulations will remove NARA facilities' hours of operation from the Code of Federal Regulations (CFR) and establish procedures that NARA...

  17. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  18. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  19. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  20. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  1. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  2. 75 FR 47678 - Northern Plains Railroad, Inc.-Lease Exemption-Soo Line Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... Surface Transportation Board Northern Plains Railroad, Inc.--Lease Exemption--Soo Line Railroad Company... authority to determine whether to issue notices of exemption for lease transactions under 49 U.S.C. 10902... notice of lease and operation exemption should be issued, and does so here. Northern Plains Railroad,...

  3. Integrated safeguards and facility design and operations

    SciTech Connect

    Tape, J.W.; Coulter, C.A.; Markin, J.T.; Thomas, K.E.

    1987-01-01

    The integration of safeguards functions to deter or detect unauthorized actions by insiders requires careful communication and management of safeguards-relevant information on a timely basis. The separation of safeguards functions into physical protection, materials control, and materials accounting often inhibits important information flows. Redefining the major safeguards functions as authorization, enforcement, and verification and careful attention to management of information can result in effective safeguards integration. Whether designing new systems or analyzing existing ones, understanding the interface between facility operations and safeguards is critical to cost-effective integrated safeguards systems that meet modern standards of performance.

  4. 75 FR 68399 - Lancaster & Chester Railroad, LLC-Acquisition and Operation Exemption-Line of Lancaster & Chester...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... served and published in the Federal Register on Friday, October 15, 2010 (75 FR 63,532-33). In the notice... Station 0+06 (milepost SG-346+2210) in Chester County, S.C. Instead, L&C Railroad will connect with...

  5. 76 FR 22749 - Camden & Southern Railroad, Inc.-Lease and Operation Exemption-Camden Area Industrial Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... & Russellville R.R., Ouachita R.R., & Camden & S. R.R., 76 FR 21797-98 (Apr. 18, 2011). The transaction is... Industrial Development Corporation Camden & Southern Railroad, Inc. (C&S), a noncarrier, has filed a verified... Area Industrial Development Corporation (CAIDC), located at Zone JH482, Yard 06, opposite milepost...

  6. 75 FR 68397 - DeQueen and Eastern Railroad, LLC-Acquisition and Operation Exemption-DeQueen and Eastern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... border) and milepost 87.0 (Perkins, Ark.), including auxiliary, temporary storage, and spur tracks, in Howard and Sevier Counties, Ark.\\1\\ \\1\\ DQE states that it intends to interchange traffic at De Queen, Ark. with Kansas City Southern Railway Company, at Perkins with Union Pacific Railroad Company, and...

  7. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    SciTech Connect

    BENECKE, M.W.

    2000-09-06

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility.

  8. Facility Will Help Transition Models Into Operations

    NASA Astrophysics Data System (ADS)

    Kumar, Mohi

    2009-02-01

    The U.S. National Oceanic and Atmospheric Administration's Space Weather Prediction Center (NOAA SWPC), in partnership with the U.S. Air Force Weather Agency (AFWA), is establishing a center to promote and facilitate the transition of space weather models to operations. The new facility, called the Developmental Testbed Center (DTC), will take models used by researchers and rigorously test them to see if they can withstand continued use as viable warning systems. If a model used in a space weather warning system crashes or fails to perform well, severe consequences can result. These include increased radiation risks to astronauts and people traveling on high-altitude flights, national security vulnerabilities from the loss of military satellite communications, and the cost of replacing damaged military and commercial spacecraft.

  9. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  10. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  11. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  12. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  13. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  14. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Design and operation of facility. 264... Preparedness and Prevention § 264.31 Design and operation of facility. Facilities must be designed, constructed... could threaten human health or the environment....

  15. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Design and operation of facility. 264... Preparedness and Prevention § 264.31 Design and operation of facility. Facilities must be designed, constructed... could threaten human health or the environment....

  16. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Design and operation of facility. 264... Preparedness and Prevention § 264.31 Design and operation of facility. Facilities must be designed, constructed... could threaten human health or the environment....

  17. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Design and operation of facility. 264... Preparedness and Prevention § 264.31 Design and operation of facility. Facilities must be designed, constructed... could threaten human health or the environment....

  18. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Design and operation of facility. 264... Preparedness and Prevention § 264.31 Design and operation of facility. Facilities must be designed, constructed... could threaten human health or the environment....

  19. High level waste facilities -- Continuing operation or orderly shutdown

    SciTech Connect

    Decker, L.A.

    1998-04-01

    Two options for Environmental Impact Statement No action alternatives describe operation of the radioactive liquid waste facilities at the Idaho Chemical Processing Plant at the Idaho National Engineering and Environmental Laboratory. The first alternative describes continued operation of all facilities as planned and budgeted through 2020. Institutional control for 100 years would follow shutdown of operational facilities. Alternatively, the facilities would be shut down in an orderly fashion without completing planned activities. The facilities and associated operations are described. Remaining sodium bearing liquid waste will be converted to solid calcine in the New Waste Calcining Facility (NWCF) or will be left in the waste tanks. The calcine solids will be stored in the existing Calcine Solids Storage Facilities (CSSF). Regulatory and cost impacts are discussed.

  20. Shoreham Railroad Bridge, Title Sheet Shoreham Railroad Bridge, Former ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Shoreham Railroad Bridge, Title Sheet - Shoreham Railroad Bridge, Former Addison County Railroad (later, Rutland Railroad, Addison Branch), spanning Lemon Fair River above Richville Pond, west of East Shoreham Road, Shoreham, Addison County, VT

  1. 76 FR 4276 - Hazardous Materials: Improving the Safety of Railroad Transportation of Hazardous Materials

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Transportation of Hazardous Materials AGENCY: Federal Railroad Administration (FRA), Department of Transportation... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION... comments. Fax: 202-493-2251. Mail: Docket Operations Facility, U.S. Department of Transportation, 1200...

  2. Railroad electrification in America's future: an assessment of prospects and impacts. Final report

    SciTech Connect

    White, R.K.; Yabroff, I.W.; Dickson, E.M.; Zink, R.A.; Gray, M.E.; Moon, A.E.

    1980-01-01

    Such considerations as the level of traffic, the relative financial health of individual railroads, the capacity of the associated supply and engineering/construction industries, and the logical connecting points at classifying yards, as well as the national interest value of creating a continuous system, continental in scope, were used to construct a scenario for railroad electrification that closely approximates how an electrification program might be implemented. For the economic reasons cited, much of the US railroad system would remain conventionally powered. This scenario provides for an electrified network involving 14 mainlines operated by 10 companies that could transport much of the nation's rail-borne freight. Five years of planning and engineering work would be required for each link before construction could begin. With 1000 miles or less of electrified route per year, 14 years would be needed to construct the 9000-mile network of our scenario. (The scenario constructed runs from 1980 to 1998.) The analysis was aided with the construction of the SRI Railroad Industry Model. Basically a model of industry operations and finances, the model produces income statements and balance sheets at yearly intervals. Railroad energy costs, railroad freight levels, maintenance costs, purchases and leases of rooling stock, electrification facility investments, future inflation, rate setting practices, annual depreciation, taxes, and profits were calculated.

  3. Operational Safety Requirements Neutron Multiplier Facility in 329 Building

    SciTech Connect

    EA. Lepel

    1992-10-01

    The operational safety requirements (OSRs) presented in this report define the conditions, safe boundaries and management control needed for safely operating the Neutron Multiplier Facility in the 329 Building Annex.

  4. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Maintenance and operation of facility..., STORAGE, AND DISPOSAL FACILITIES Preparedness and Prevention § 265.31 Maintenance and operation of..., soil, or surface water which could threaten human health or the -environment....

  5. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Maintenance and operation of facility..., STORAGE, AND DISPOSAL FACILITIES Preparedness and Prevention § 265.31 Maintenance and operation of..., soil, or surface water which could threaten human health or the -environment....

  6. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Maintenance and operation of facility..., STORAGE, AND DISPOSAL FACILITIES Preparedness and Prevention § 265.31 Maintenance and operation of..., soil, or surface water which could threaten human health or the -environment....

  7. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Maintenance and operation of facility..., STORAGE, AND DISPOSAL FACILITIES Preparedness and Prevention § 265.31 Maintenance and operation of..., soil, or surface water which could threaten human health or the -environment....

  8. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Maintenance and operation of facility..., STORAGE, AND DISPOSAL FACILITIES Preparedness and Prevention § 265.31 Maintenance and operation of..., soil, or surface water which could threaten human health or the -environment....

  9. A study of the operation of selected national research facilities

    NASA Technical Reports Server (NTRS)

    Eisner, M.

    1974-01-01

    The operation of national research facilities was studied. Conclusions of the study show that a strong resident scientific staff is required for successful facility operation. No unique scheme of scientific management is revealed except for the obvious fact that the management must be responsive to the users needs and requirements. Users groups provide a convenient channel through which these needs and requirements are communicated.

  10. 49 CFR 1.88 - The Federal Railroad Administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false The Federal Railroad Administration. 1.88 Section... AND DUTIES Operating Administrations § 1.88 The Federal Railroad Administration. Is responsible for: (a) Regulating safety functions pertaining to railroads; (b) Conducting research and...

  11. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  12. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  13. 49 CFR 1.88 - The Federal Railroad Administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false The Federal Railroad Administration. 1.88 Section... AND DUTIES Operating Administrations § 1.88 The Federal Railroad Administration. Is responsible for: (a) Regulating safety functions pertaining to railroads; (b) Conducting research and...

  14. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  15. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  16. 49 CFR 1.88 - The Federal Railroad Administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false The Federal Railroad Administration. 1.88 Section... AND DUTIES Operating Administrations § 1.88 The Federal Railroad Administration. Is responsible for: (a) Regulating safety functions pertaining to railroads; (b) Conducting research and...

  17. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  18. 14 CFR 121.122 - Communications facilities-supplemental operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communications facilities-supplemental operations. 121.122 Section 121.122 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC,...

  19. National Ignition Facility (NIF) operations procedures plan

    SciTech Connect

    Mantrom, D.

    1998-05-06

    The purpose of this Operations Procedures Plan is to establish a standard procedure which outlines how NIF Operations procedures will be developed (i.e , written, edited, reviewed, approved, published, revised) and accessed by the NIF Operations staff who must use procedures in order to accomplish their tasks. In addition, this Plan is designed to provide a guide to the NIF Project staff to assist them in planning and writing procedures. Also, resource and scheduling information is provided.

  20. School Facilities Maintenance and Operations Manual.

    ERIC Educational Resources Information Center

    Association of School Business Officials International, Reston, VA.

    Often a community's largest single investment is in its physical plants, including public school buildings and grounds. An essential factor in efficient school district operation is a well-organized, responsive plant operations and maintenance division. Maintenance has generally been defined as those services, activities, and procedures concerned…

  1. An overview of the Railroad Retirement program.

    PubMed

    Whitman, Kevin

    2008-01-01

    In the 1930s, amidst concern about the ability of existing pension programs to provide former railroad workers with adequate assistance in old age, Congress established a national Railroad Retirement system. This system is primarily administered by the Railroad Retirement Board (RRB), which is an independent federal agency charged with providing benefits to eligible employees of the railroad industry and their families. Today, the Railroad Retirement program is closely tied to the far better-known Social Security program, and although the Railroad Retirement program and Social Security share a number of common elements, key differences also exist between the two in areas such as funding and benefit structure. This article aims to increase awareness and understanding of the Railroad Retirement program and its relationship with Social Security by examining the parallel development of these two retirement programs while illuminating areas where the two diverge. The history of the Railroad Retirement program, the benefits provided by the program, and RRB's financial operations are reviewed, using elements of the Social Security system as points of reference. PMID:19102137

  2. Developing operational safety requirements for non-nuclear facilities

    SciTech Connect

    Mahn, J.A.

    1997-11-01

    Little guidance has been provided by the DOE for developing appropriate Operational Safety Requirements (OSR) for non-nuclear facility safety documents. For a period of time, Chapter 2 of DOE/AL Supplemental Order 5481.lB provided format guidance for non-reactor nuclear facility OSRs when this supplemental order applied to both nuclear and non-nuclear facilities. Thus, DOE Albuquerque Operations Office personnel still want to see non-nuclear facility OSRs in accordance with the supplemental order (i.e., in terms of Safety Limits, Limiting Conditions for Operation, and Administrative Controls). Furthermore, they want to see a clear correlation between the OSRs and the results of a facility safety analysis. This paper demonstrates how OSRs can be rather simply derived from the results of a risk assessment performed using the ``binning`` methodology of SAND95-0320.

  3. Lunar landing and launch facilities and operations

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A preliminary design of a lunar landing and launch facility for a Phase 3 lunar base is formulated. A single multipurpose vehicle for the lunar module is assumed. Three traffic levels are envisioned: 6, 12, and 24 landings/launches per year. The facility is broken down into nine major design items. A conceptual description of each of these items is included. Preliminary sizes, capacities, and/or other relevant design data for some of these items are obtained. A quonset hut tent-like structure constructed of aluminum rods and aluminized mylar panels is proposed. This structure is used to provide a constant thermal environment for the lunar modules. A structural design and thermal analysis is presented. Two independent designs for a bridge crane to unload/load heavy cargo from the lunar module are included. Preliminary investigations into cryogenic propellant storage and handling, landing/launch guidance and control, and lunar module maintenance requirements are performed. Also, an initial study into advanced concepts for application to Phase 4 or 5 lunar bases has been completed in a report on capturing, condensing, and recycling the exhaust plume from a lunar launch.

  4. Fuel supply shutdown facility interim operational safety requirements

    SciTech Connect

    Besser, R.L.; Brehm, J.R.; Benecke, M.W.; Remaize, J.A.

    1995-05-23

    These Interim Operational Safety Requirements (IOSR) for the Fuel Supply Shutdown (FSS) facility define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls to ensure safe operation. The IOSRs apply to the fuel material storage buildings in various modes (operation, storage, surveillance).

  5. Design and operations at the National Tritium Labelling Facility

    SciTech Connect

    Morimoto, H.; Williams, P.G.

    1991-09-01

    The National Tritium Labelling Facility (NTLF) is a multipurpose facility engaged in tritium labeling research. It offers to the biomedical research community a fully equipped laboratory for the synthesis and analysis of tritium labeled compounds. The design of the tritiation system, its operations and some labeling techniques are presented.

  6. Operational summary of an electric propulsion long term test facility

    NASA Technical Reports Server (NTRS)

    Trump, G. E.; James, E. L.; Bechtel, R. T.

    1982-01-01

    An automated test facility capable of simultaneously operating three 2.5 kW, 30-cm mercury ion thrusters and their power processors is described, along with a test program conducted for the documentation of thruster characteristics as a function of time. Facility controls are analog, with full redundancy, so that in the event of malfunction the facility automaticcally activates a backup mode and notifies an operator. Test data are recorded by a central data collection system and processed as daily averages. The facility has operated continuously for a period of 37 months, over which nine mercury ion thrusters and four power processor units accumulated a total of over 14,500 hours of thruster operating time.

  7. 33 CFR 158.163 - Reception facility operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... required to have an Operations Manual under this chapter or 46 CFR Chapter 1 must have a copy of the... (CONTINUED) POLLUTION RECEPTION FACILITIES FOR OIL, NOXIOUS LIQUID SUBSTANCES, AND GARBAGE General §...

  8. 33 CFR 158.163 - Reception facility operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... required to have an Operations Manual under this chapter or 46 CFR Chapter 1 must have a copy of the... (CONTINUED) POLLUTION RECEPTION FACILITIES FOR OIL, NOXIOUS LIQUID SUBSTANCES, AND GARBAGE General §...

  9. 33 CFR 158.163 - Reception facility operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... required to have an Operations Manual under this chapter or 46 CFR Chapter 1 must have a copy of the... (CONTINUED) POLLUTION RECEPTION FACILITIES FOR OIL, NOXIOUS LIQUID SUBSTANCES, AND GARBAGE General §...

  10. 33 CFR 158.163 - Reception facility operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... required to have an Operations Manual under this chapter or 46 CFR Chapter 1 must have a copy of the... (CONTINUED) POLLUTION RECEPTION FACILITIES FOR OIL, NOXIOUS LIQUID SUBSTANCES, AND GARBAGE General §...

  11. 33 CFR 158.163 - Reception facility operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... required to have an Operations Manual under this chapter or 46 CFR Chapter 1 must have a copy of the... (CONTINUED) POLLUTION RECEPTION FACILITIES FOR OIL, NOXIOUS LIQUID SUBSTANCES, AND GARBAGE General §...

  12. Spent nuclear fuel project cold vacuum drying facility operations manual

    SciTech Connect

    IRWIN, J.J.

    1999-05-12

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  13. All purpose railroad car

    SciTech Connect

    Terlecky, B.S.

    1987-01-13

    An all purpose railroad car is described for transporting wheeled trailers and containers, the car comprising an elongated frame supported by wheel trucks, combined hitch and bolster means adjacent one end of the frame for selectively receiving and releasably retaining a trailer king pin and one end of a container. A means is spaced from the combined hitch and bolster means for selectively receiving and supporting the wheels of a wheeled trailer and the other end of a container. The combined hitch and bolster means is an integral rigid structure with the hitch fixed in spaced relationship to the bolster with both the hitch and the bolster permanently disposed in operative position to respectively receive and retain a trailer king pin and a container.

  14. 76 FR 1666 - Susquehanna Union Railroad Company-Control Exemption-North Shore Railroad Company, Nittany & Bald...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Company, Nittany & Bald Eagle Railroad Company, Shamokin Valley Railroad Company, Juniata Valley Railroad... Class III railroads: North Shore Railroad Company, Nittany & Bald Eagle Railroad Company,...

  15. 77 FR 64592 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ...--in Custer, Powder River and Rosebud Counties, MT AGENCY: Surface Transportation Board, DOT. ACTION.... \\1\\ Tongue River R.R.--Rail Construction and Operation--In Custer, Powder River and Rosebud Cntys...\\ Tongue River R.R.--Rail Constr. & Operation--In Custer, Powder River & Rosebud Cntys., Mont., FD 30186...

  16. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  17. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  18. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  19. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  20. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  1. Railroad and locomotive technology roadmap.

    SciTech Connect

    Stodolsky, F.; Gaines, L.; Energy Systems

    2003-02-24

    Railroads are important to the U.S. economy. They transport freight efficiently, requiring less energy and emitting fewer pollutants than other modes of surface transportation. While the railroad industry has steadily improved its fuel efficiency--by 16% over the last decade--more can, and needs to, be done. The ability of locomotive manufacturers to conduct research into fuel efficiency and emissions reduction is limited by the small number of locomotives manufactured annually. Each year for the last five years, the two North American locomotive manufacturers--General Electric Transportation Systems and the Electro-Motive Division of General Motors--have together sold about 800 locomotives in the United States. With such a small number of units over which research costs can be spread, outside help is needed to investigate all possible ways to reduce fuel usage and emissions. Because fuel costs represent a significant portion of the total operating costs of a railroad, fuel efficiency has always been an important factor in the design of locomotives and in the operations of a railroad. However, fuel efficiency has recently become even more critical with the introduction of strict emission standards by the U.S. Environmental Protection Agency, to be implemented in stages (Tiers 0, 1, and 2) between 2000 and 2005. Some of the technologies that could be employed to meet the emission standards may negatively affect fuel economy--by as much as 10-15% when emissions are reduced to Tier 1 levels. Lowering fuel economy by that magnitude would have a serious impact on the cost to the consumer of goods shipped by rail, on the competitiveness of the railroad industry, and on this country's dependence on foreign oil. Clearly, a joint government/industry R&D program is needed to help catalyze the development of advanced technologies that will substantially reduce locomotive engine emissions while also improving train system energy efficiency. DOE convened an industry

  2. Recent Enhancements to the National Transonic Facility (Mixed Mode Operations)

    NASA Technical Reports Server (NTRS)

    Kilgore, W. Allen; Chan, David; Balakrishna, S.; Wahls, Richard A.

    2006-01-01

    The U.S. National Transonic Facility continues to make enhancements to provide quality data in a safe, efficient and cost effective method for aerodynamic ground testing. Recent enhancements discussed in this paper include the development of a Mixed-mode of operations that combine Air-mode operations with Nitrogen-mode operations. This implementation and operational results of this new Mixed-mode expands the ambient temperature transonic region of testing beyond the Air-mode limitations at a significantly reduced cost over Nitrogen Mode operation.

  3. 78 FR 1936 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-In Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-09

    ... Custer, Powder River and Rosebud Counties, MT AGENCY: Surface Transportation Board. ACTION: Notice of... Custer, Powder River and Rosebud Cntys., Mont. (Tongue River I), FD 30186 (ICC served Sept. 4, 1985... III. \\4\\ See Tongue River R.R.--Rail Constr. and Operation--In Custer, Powder River and Rosebud...

  4. Description and Operation of the A3 Subscale Facility

    NASA Technical Reports Server (NTRS)

    Saunders, G. P.; Varner, D. G.; Grover, J. B.

    2010-01-01

    The purpose of this paper is to give an overview of the general design and operation of the A3 Subscale test facility. The goal is to provide the reader with a general understanding of what the major facility systems are, where they are located, and how they are used to meet the objectives supporting the design of the A3 altitude rocket test facility. This paper also provides the reader with the background information prior to reading the subsequent papers detailing the design and test results of the various systems described herein.

  5. Johnson County Community College and Burlington Northern Railroad.

    ERIC Educational Resources Information Center

    Radakovich, Dan; Lindsay, Susan; Osborn, Bill

    In order to serve the educational needs of the business community and generate revenues, Johnson County Community College (Kansas) formed a partnership with Burlington Northern Railroad in which the railroad's training facility would be relocated on the college's campus. This report documents the development of that relationship, its purpose, and…

  6. Assuring operational readiness of the National Ignition Facility.

    PubMed

    Brereton, Sandra J; Papp, Frank

    2013-06-01

    National Ignition Facility experiments involve the use of a variety of materials that generate a number of radiological issues. Along with the use of tritium and depleted uranium, shots generating neutrons create prompt radiation fields as well as fission and activation products. In order to assure readiness for these hazards, a series of readiness reviews was conducted as the hazards were introduced. Each step was built upon the previous steps, as well as the basic infrastructure and operating capability of the laser facility. A detailed preparation plan for the introduction of these hazards was developed. This included ensuring required equipment was in place and ready, all plans and procedures were developed, and personnel were trained and qualified to perform work in the environment. The approach for preparing the facility for operations under the new set of conditions, the preparations for the readiness reviews, the review process, as well as the approach to initial operations are discussed. PMID:23629065

  7. KSC facilities status and planned management operations. [for Shuttle launches

    NASA Technical Reports Server (NTRS)

    Gray, R. H.; Omalley, T. J.

    1979-01-01

    A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.

  8. APET methodology for Defense Waste Processing Facility: Mode C operation

    SciTech Connect

    Taylor, R.P. Jr.; Massey, W.M.

    1995-04-01

    Safe operation of SRS facilities continues to be the highest priority of the Savannah River Site (SRS). One of these facilities, the Defense Waste Processing Facility or DWPF, is currently undergoing cold chemical runs to verify the design and construction preparatory to hot startup in 1995. The DWPFF is a facility designed to convert the waste currently stored in tanks at the 200-Area tank farm into a form that is suitable for long term storage in engineered surface facilities and, ultimately, geologic isolation. As a part of the program to ensure safe operation of the DWPF, a probabilistic Safety Assessment of the DWPF has been completed. The results of this analysis are incorporated into the Safety Analysis Report (SAR) for DWPF. The usual practice in preparation of Safety Analysis Reports is to include only a conservative analysis of certain design basis accidents. A major part of a Probabilistic Safety Assessment is the development and quantification of an Accident Progression Event Tree or APET. The APET provides a probabilistic representation of potential sequences along which an accident may progress. The methodology used to determine the risk of operation of the DWPF borrows heavily from methods applied to the Probabilistic Safety Assessment of SRS reactors and to some commercial reactors. This report describes the Accident Progression Event Tree developed for the Probabilistic Safety Assessment of the DWPF.

  9. Man-Vehicle Systems Research Facility - Design and operating characteristics

    NASA Technical Reports Server (NTRS)

    Shiner, Robert J.; Sullivan, Barry T.

    1992-01-01

    This paper describes the full-mission flight simulation facility at the NASA Ames Research Center. The Man-Vehicle Systems Research Facility (MVSRF) supports aeronautical human factors research and consists of two full-mission flight simulators and an air-traffic-control simulator. The facility is used for a broad range of human factors research in both conventional and advanced aviation systems. The objectives of the research are to improve the understanding of the causes and effects of human errors in aviation operations, and to limit their occurrence. The facility is used to: (1) develop fundamental analytical expressions of the functional performance characteristics of aircraft flight crews; (2) formulate principles and design criteria for aviation environments; (3) evaluate the integration of subsystems in contemporary flight and air traffic control scenarios; and (4) develop training and simulation technologies.

  10. ARM Operations and Engineering Procedure Mobile Facility Site Startup

    SciTech Connect

    Voyles, Jimmy W

    2015-05-01

    This procedure exists to define the key milestones, necessary steps, and process rules required to commission and operate an Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF), with a specific focus toward on-time product delivery to the ARM Data Archive. The overall objective is to have the physical infrastructure, networking and communications, and instrument calibration, grooming, and alignment (CG&A) completed with data products available from the ARM Data Archive by the Operational Start Date milestone.

  11. Waste Encapsulation and Storage Facility interim operational safety requirements

    SciTech Connect

    COVEY, L.I.

    2000-11-28

    The Interim Operational Safety Requirements (IOSRs) for the Waste Encapsulation and Storage Facility (WESF) define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation during receipt and inspection of cesium and strontium capsules from private irradiators; decontamination of the capsules and equipment; surveillance of the stored capsules; and maintenance activities. Controls required for public safety, significant defense-in-depth, significant worker safety, and for maintaining radiological consequences below risk evaluation guidelines (EGs) are included.

  12. The Defense Waste Processing Facility: Two Years of Radioactive Operation

    SciTech Connect

    Marra, S.L.; Gee, J.T.; Sproull, J.F.

    1998-05-01

    The Defense Waste Processing Facility (DWPF) at the Savannah River Site in Aiken, SC is currently immobilizing high level radioactive sludge waste in borosilicate glass. The DWPF began vitrification of radioactive waste in May, 1996. Prior to that time, an extensive startup test program was completed with simulated waste. The DWPF is a first of its kind facility. The experience gained and data collected during the startup program and early years of operation can provide valuable information to other similar facilities. This experience involves many areas such as process enhancements, analytical improvements, glass pouring issues, and documentation/data collection and tracking. A summary of this experience and the results of the first two years of operation will be presented.

  13. Evaluating Operational Irregularities at Hanford's Environmental Restoration Disposal Facility

    SciTech Connect

    Benson, C.H.; Albright, W.H.; Ray, D.P.; Smegal, J.S.; Robertson, Jr.O.C.; Gupta, D.C.

    2008-07-01

    This paper describes the findings of an independent technical review that investigated operational irregularities at the Environmental Restoration Disposal Facility (ERDF) at Hanford. The ERDF is a large-scale disposal facility authorized by the Environmental Protection Agency and the Washington State Department of Ecology to receive waste from Hanford cleanup activities. The irregularities included (i) failure to recognize that pumps for the leachate collection system were not functioning for an extended period and (ii) falsification of compaction data by a technician responsible for monitoring waste placement in the ERDF. Other issues related to compaction of the waste were also considered during the independent technical review. A number of important lessons were learned as part of this review. These lessons are summarized in the paper. They are relevant to the ERDF as well as other landfill operations at Department of Energy facilities. (authors)

  14. Space Station Freedom technology payload user operations facility concept

    NASA Technical Reports Server (NTRS)

    Henning, Gary N.; Avery, Don E.

    1992-01-01

    This report presents a concept for a User Operations Facility (UOF) for payloads sponsored by the NASA Office of Aeronautics and Space Technology (OAST). The UOF can be located at any OAST sponsored center; however, for planning purposes, it is assumed that the center will be located at Langley Research Center (LaRC).

  15. Federal Guidelines - Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document contains the federal guidelines for meeting the specific requirements of the Federal Water Pollution Control Act Amendments of 1972. These guidelines are also intended to assist in meeting the regulations for grant assisted facility construction and to provide information on the key elements to be included in the operation plans for…

  16. Moonport: A History of Apollo Launch Facilities and Operations

    NASA Technical Reports Server (NTRS)

    Benson, C. D.; Faherty, W. B.

    1978-01-01

    The development of the Apollo f launch facilities and launch operations is described from the beginning of design through the final launch. Management techniques, innovation in automation, and testing on the ground to avoid failures in space are among the topics covered. The impact of the Apollo program on the citrus groves and quiet beaches of Florida's east coast is included.

  17. Space facilities: Meeting future needs for research, development, and operations

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The National Facilities Study (NFS) represents an interagency effort to develop a comprehensive and integrated long-term plan for world-class aeronautical and space facilities that meet current and projected needs for commercial and government aerospace research and development and space operations. At the request of NASA and the DOD, the National Research Council's Committee on Space Facilities has reviewed the space related findings of the NFS. The inventory of more than 2800 facilities will be an important resource, especially if it continues to be updated and maintained as the NFS report recommends. The data in the inventory provide the basis for a much better understanding of the resources available in the national facilities infrastructure, as well as extensive information on which to base rational decisions about current and future facilities needs. The working groups have used the inventory data and other information to make a set of recommendations that include estimates of cast savings and steps for implementation. While it is natural that the NFS focused on cost reduction and consolidations, such a study is most useful to future planning if it gives equal weight to guiding the direction of future facilities needed to satisfy legitimate national aspirations. Even in the context of cost reduction through facilities closures and consolidations, the study is timid about recognizing and proposing program changes and realignments of roles and missions to capture what could be significant savings and increased effectiveness. The recommendations of the Committee on Space Facilities are driven by the clear need to be more realistic and precise both in recognizing current incentives and disincentives in the aerospace industry and in forecasting future conditions for U.S. space activities.

  18. Railroad routing and costing. Final report

    SciTech Connect

    Bronzini, M.S.; Sherman, D.M.

    1986-08-01

    This research has the objective of providing reliable tools for forecasting the costs of transporting coal from the coal supply regions to the coal demand regions of the United States. The present work was devoted primarily to improving and updating the Railroad Routing Model (RRM) and related data base developed earlier. The railroad network data were modified to incorporate the extensive structural changes which occurred during the period 1980 to 1982. All of the rail time, energy, and cost functions were completely reestimated, taking advantage of improved railrod operations and cost simulators and recent research on railroad costs. After a review of the latest research on railroad routing in large networks, the RRM was refined and tailored to the problem of finding likely routes and estimating fully allocated carrier costs for coal shipments. A new RRM routing algorithm finds routes which satisfy the dual railroad objectives of maximizing the carrier's share of total shipment revenue and minimizing cost. Five utilities tested and demonstrated the new RRM and data base in a series of case studies. These utilities provided data on 38 coal moves with haul distances of 200 to 1700 miles, including a mixture of both existing and prospective movements. The RRM was found to produce credible results. Full and effective use of these improved tools for railroad routing and costing has been facilitated through additional work to develop an interactive system with improved data base management capabilities and expanded cost estimating features.

  19. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1996 Annual Report.

    SciTech Connect

    Rowan, Gerald D.

    1997-06-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinook and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996.

  20. 3. EXTERIOR VIEW TO THE NORTHEAST OF A RAILROAD CAR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. EXTERIOR VIEW TO THE NORTHEAST OF A RAILROAD CAR ON THE TRACKS AND THE PARTS OF AN ENGINE STAND. - Nevada Test Site, Pluto Facility, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  1. 30. West view, showing court in storehouse #1 adn railroad ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. West view, showing court in storehouse #1 adn railroad facilities connecting with yards and float bridges at thirty-eighth street. - U.S. Navy Fleet Supply Base, Storehouse No. 1, 830 Third Avenue, Brooklyn, Kings County, NY

  2. 78 FR 37660 - American Surface Lines, LLC-Acquisition and Operation Exemption-Mikrut Properties, LLLP

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... Canadian Pacific Railroad Company (CP) at or near Pelzer Street to a transloading facility owned and... tracks that connect to CP's line have been operated pursuant to a private siding agreement between CP...

  3. 78 FR 75959 - CaterParrott Railnet, LLC-Change in Operators Exemption-Rail Lines of Central of Georgia Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-13

    ... Central of Georgia Railroad Company CaterParrott Railnet, LLC (CPR), a Class III rail carrier, has filed a..., Inc. (SCS), to CPR on the following rail lines located in Georgia and owned by Central of Georgia... served Sept. 17, 2009). According to CPR, an agreement has been reached between the parties under...

  4. Neighborhood Facilities: A Study of Operating Facilities. Community Development Evaluation Series, Number 1.

    ERIC Educational Resources Information Center

    Department of Housing and Urban Development, Washington, DC.

    This report, the first of a series attempting to provide information on community development programs, Federal processes, and policies, presents an evaluation of the operating centers constructed with Housing and Urban Development Neighborhood Facilities grants. The program evaluated provides grants to help local public bodies finance development…

  5. Pre-operational safety appraisal Tritiated Scrap Recovery Facility, Mound facility

    SciTech Connect

    Dauby, J.J.; Flanagan, T.M.; Metcalf, L.W.; Rhinehammer, T.B.

    1996-07-01

    The purpose of this report is to identify, assess, and document the hazards which are associated with the proposed operation of the Tritiated Scrap Recovery Facility at Mound Facility. A Pre-operational Safety Appraisal is a requirement as stated in Department of Energy Order 5481.1, Safety Analysis and Review System. The operations to be conducted in the new Tritiated Scrap Waste Recovery Facility are not new, but a continuation of a prime mission of Mound`s i.e. recovery of tritium from waste produced throughout the DOE complex. The new facility is a replacement of an existing process started in the early 1960`s and incorporates numerous design changes to enhance personnel and environmental safety. This report also documents the safety of a one time operation involving the recovery of tritium from material obtained by the Department of Energy from the State of Arizona. This project will involve the processing of 240,000 curies of tritium contained in glass ampoules that were to be used in items such as luminous dial watches. These were manufactured by the now defunct American Atomics Corporation, Tucson, Arizona.

  6. Feasibility study for a transportation operations system cask maintenance facility

    SciTech Connect

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  7. Man-vehicle systems research facility: Design and operating characteristics

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The Man-Vehicle Systems Research Facility (MVSRF) provides the capability of simulating aircraft (two with full crews), en route and terminal air traffic control and aircrew interactions, and advanced cockpit (1995) display representative of future generations of aircraft, all within the full mission context. The characteristics of this facility derive from research, addressing critical human factors issues that pertain to: (1) information requirements for the utilization and integration of advanced electronic display systems, (2) the interaction and distribution of responsibilities between aircrews and ground controllers, and (3) the automation of aircrew functions. This research has emphasized the need for high fidelity in simulations and for the capability to conduct full mission simulations of relevant aircraft operations. This report briefly describes the MVSRF design and operating characteristics.

  8. Embracing Safe Ground Test Facility Operations and Maintenance

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  9. National Transonic Facility: A review of the operational plan

    NASA Technical Reports Server (NTRS)

    Liepmann, H. W.; Black, R. E.; Dietz, R. O.; Kirchner, M. E.; Sears, W. R.

    1980-01-01

    The proposed National Transonic Facility (NTF) operational plan is reviewed. The NTF will provide an aerodynamic test capability significantly exceeding that of other transonic regime wind tunnels now available. A limited number of academic research program that might use the NTF are suggested. It is concluded that the NTF operational plan is useful for management, technical, instrumentation, and model building techniques available in the specialized field of aerodynamic analysis and simulation. It is also suggested that NASA hold an annual conference to discuss wind tunnel research results and to report on developments that will further improve the utilization and cost effectiveness of the NTF and other wind tunnels.

  10. Design and operation of an outdoor microalgae test facility

    SciTech Connect

    Weissman, J.C.; Tillett, D.M.; Goebel, R.P. )

    1989-10-01

    The objective of the project covered in this report is to establish and operate a facility in the American Southwest to test the concept of producing microalgae on a large scale. This microalgae would then be used as a feedstock for producing liquid fuels. The site chosen for this project was an existing water research station in Roswell, New Mexico; the climate and water resources are representative of those in the Southwest. For this project, researchers tested specific designs, modes of operation, and strains of microalgae; proposed and evaluated modifications to technological concepts; and assessed the progress toward meeting cost objectives.

  11. Solid Waste Operations Complex (SWOC) Facilities Sprinkler System Hydraulic Calculations

    SciTech Connect

    KERSTEN, J.K.

    2003-07-11

    The attached calculations demonstrate sprinkler system operational water requirements as determined by hydraulic analysis. Hydraulic calculations for the waste storage buildings of the Central Waste Complex (CWC), T Plant, and Waste Receiving and Packaging (WRAP) facility are based upon flow testing performed by Fire Protection Engineers from the Hanford Fire Marshal's office. The calculations received peer review and approval prior to release. The hydraulic analysis program HASS Computer Program' (under license number 1609051210) is used to perform all analyses contained in this document. Hydraulic calculations demonstrate sprinkler system operability based upon each individual system design and available water supply under the most restrictive conditions.

  12. Operational readiness: an integral part of the facility planning process.

    PubMed

    Kidd, LeeAnne; Howe, Rob

    2014-01-01

    Large capital building projects benefit from an operational readiness strategy prior to new facility occupancy. St. Joseph's Healthcare used a structured approach for their readiness planning that included individual work plan meetings, tools for ensuring integration across programs and services and process improvement support to ensure a smooth transition. Over 1100 staff were oriented using a Train-the-Trainer model. Significant effort was required to co-ordinate the customized training, which involved "staffing up" to ensure sufficient resources for backfill. Operational readiness planning places additional demands on managers, requiring support and assistance from dedicated resources both prior to occupancy and several months post-move. PMID:25906468

  13. National Ignition Facility Control and Information System Operational Tools

    SciTech Connect

    Marshall, C D; Beeler, R G; Bowers, G A; Carey, R W; Fisher, J M; Foxworthy, C B; Frazier, T M; Mathisen, D G; Lagin, L J; Rhodes, J J; Shaw, M J

    2009-10-08

    The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a {approx}2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint the size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.

  14. Design and operation of the Surry Radwaste Facility

    SciTech Connect

    Morris, L.L.; Halverson, W.C.

    1993-12-31

    In September 1991, Virginia Power started processing radioactive waste with a new Radwaste Facility at the Surry Power Station near Norfolk, Virginia. The Surry Radwaste Facility (SRF) was designed to process and store liquid waste, laundry waste, dry active waste, radioactive filters and spent ion-exchange resin. It also provides on-site decontamination services and a fully equipped hot machine shop. The NRC has recognized that the amount of planning and design, and the attention to detail, that was expended on the SRF Project in order to minimize personnel exposure and ensure efficient operation, is a licensee strength. Through its first year of operation, the facility has proven very successful. Using evaporation and demineralization, over 30 million liters of liquid have been released with no chemical impurities or detectable radioactivity (excluding tritium). Over 623,000 liters of concentrated boric acid waste liquid have been processed with the Bitumen Solidification System yielding 139,880 liters (660 drums) of low level Class A-Stable waste. Additional economic benefits will be realized as the effectiveness of the processing systems continues to improve due to increased operational experience and ergonomics.

  15. SILEX ground segment control facilities and flight operations

    NASA Astrophysics Data System (ADS)

    Demelenne, Benoit; Tolker-Nielsen, Toni; Guillen, Jean-Claude

    1999-04-01

    The European Space Agency is going to conduct an inter orbit link experiment which will connect a low Earth orbiting satellite and a Geostationary satellite via optical terminals. This experiment has been called SILEX (Semiconductor Inter satellite Link Experiment). Two payloads have been built. One called PASTEL (PASsager de TELecommunication) has been embarked on the French Earth observation satellite SPOT4 which has been launched successfully in March 1998. The future European experimental data relay satellite ARTEMIS (Advanced Relay and TEchnology MISsion), which will route the data to ground, will carry the OPALE terminal (Optical Payload Experiment). The European Space Agency is responsible for the operation of both terminals. Due to the complexity and experimental character of this new optical technology, the development, preparation and validation of the ground segment control facilities required a long series of technical and operational qualification tests. This paper is presenting the operations concept and the early results of the PASTEL in orbit operations.

  16. 21 CFR 1250.51 - Railroad conveyances; discharge of wastes.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Railroad conveyances; discharge of wastes. 1250.51 Section 1250.51 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES... CONVEYANCE SANITATION Equipment and Operation of Land and Air Conveyances § 1250.51 Railroad...

  17. PIRATE: A Remotely Operable Telescope Facility for Research and Education

    NASA Astrophysics Data System (ADS)

    Holmes, S.; Kolb, U.; Haswell, C. A.; Burwitz, V.; Lucas, R. J.; Rodriguez, J.; Rolfe, S. M.; Rostron, J.; Barker, J.

    2011-10-01

    We introduce PIRATE, a new remotely operable telescope facility for use in research and education, constructed from off-the-shelf hardware, operated by The Open University. We focus on the PIRATE Mark 1 operational phase, in which PIRATE was equipped with a widely used 0.35 m Schmidt-Cassegrain system (now replaced with a 0.425 m corrected Dall-Kirkham astrograph). Situated at the Observatori Astronòmic de Mallorca, PIRATE is currently used to follow up potential transiting extrasolar planet candidates produced by the SuperWASP North experiment, as well as to hunt for novae in M31 and other nearby galaxies. It is operated by a mixture of commercially available software and proprietary software developed at the Open University. We discuss problems associated with performing precision time-series photometry when using a German Equatorial Mount, investigating the overall performance of such off-the-shelf solutions in both research and teaching applications. We conclude that PIRATE is a cost-effective research facility, and it also provides exciting prospects for undergraduate astronomy. PIRATE has broken new ground in offering practical astronomy education to distance-learning students in their own homes.

  18. The insertion device magnetic measurement facility: Prototype and operational procedures

    SciTech Connect

    Burkel, L.; Dejus, R.; Maines, J.; O`Brien, J.; Vasserman, I.; Pfleuger, J.

    1993-03-01

    This report is a description of the current status of the magnetic measurement facility and is a basic instructional manual for the operation of the facility and its components. Please refer to the appendices for more detailed information about specific components and procedures. The purpose of the magnetic measurement facility is to take accurate measurements of the magnetic field in the gay of the IDs in order to determine the effect of the ID on the stored particle beam and the emitted radiation. The facility will also play an important role when evaluating new ideas, novel devices, and inhouse prototypes as part of the ongoing research and development program at the APS. The measurements will be performed with both moving search coils and moving Hall probes. The IDs will be evaluated by computer modeling of the emitted radiation for any given (measured) magnetic field map. The quality of the magnetic field will be described in terms of integrated multipoles for the effect on Storage Ring performance and in terms of the derived trajectories for the emitted radiation. Before being installed on the Storage Ring, every device will be measured and characterized to assure that it is compatible with Storage Ring requirements and radiation specifications. The accuracy that the APS needs to achieve for magnetic measurements will be based on these specifications.

  19. Operation of an industrial radiation processing facility in Mexico

    NASA Astrophysics Data System (ADS)

    Torres C., Gilberto

    A 10 years old JS-6500 industrial Cobalt 60 irradiator was installed in 1980 at the ININ Nuclear Center in Mexico with 960 kGy. The facility was commissioning in August with some minor changes with respect to the original AECL design, in order to give services to different industries and also to do research in several fields. During that year promotional activities were done to increase interest from industry in the use of radiation processing. In 1981, an interruption due to pool's leakage and its reparation, put the facility out of operation. During the next three years the demand increases but never reach more than 50% if the capacity. In that time, the potential users did not show confidence in the process, even knowing that health authorities approved with no restrictions radiation sterilization. Actually, there are 34 different companies irradiating 48 different products. Even those within the same grouping, require different minimum and maximum radiation doses, so the facility has been operated combining products and valumes. The experiences are presented in this paper. Also, maintenance of the irradiator is discussed and some modifications to the original programme have been done due to the necessity to use local spare parts instead of imported ones.

  20. EnergySolution's Clive Disposal Facility Operational Research Model - 13475

    SciTech Connect

    Nissley, Paul; Berry, Joanne

    2013-07-01

    EnergySolutions owns and operates a licensed, commercial low-level radioactive waste disposal facility located in Clive, Utah. The Clive site receives low-level radioactive waste from various locations within the United States via bulk truck, containerised truck, enclosed truck, bulk rail-cars, rail boxcars, and rail inter-modals. Waste packages are unloaded, characterized, processed, and disposed of at the Clive site. Examples of low-level radioactive waste arriving at Clive include, but are not limited to, contaminated soil/debris, spent nuclear power plant components, and medical waste. Generators of low-level radioactive waste typically include nuclear power plants, hospitals, national laboratories, and various United States government operated waste sites. Over the past few years, poor economic conditions have significantly reduced the number of shipments to Clive. With less revenue coming in from processing shipments, Clive needed to keep its expenses down if it was going to maintain past levels of profitability. The Operational Research group of EnergySolutions were asked to develop a simulation model to help identify any improvement opportunities that would increase overall operating efficiency and reduce costs at the Clive Facility. The Clive operations research model simulates the receipt, movement, and processing requirements of shipments arriving at the facility. The model includes shipment schedules, processing times of various waste types, labor requirements, shift schedules, and site equipment availability. The Clive operations research model has been developed using the WITNESS{sup TM} process simulation software, which is developed by the Lanner Group. The major goals of this project were to: - identify processing bottlenecks that could reduce the turnaround time from shipment arrival to disposal; - evaluate the use (or idle time) of labor and equipment; - project future operational requirements under different forecasted scenarios. By identifying

  1. Lunar Transportation Facilities and Operations Study, option 2

    NASA Technical Reports Server (NTRS)

    1992-01-01

    During the Option 2 period of the Lunar Transportation Facilities and Operations Study (LTFOS), a joint McDonnell Douglas Space Systems Company Kennedy Space Center (MDSSC-KSC) and National Aeronautics and Space Administration Kennedy Space Center (NASA-KSC) Study team conducted a comparison of the functional testing of the RL-10 and Space Shuttle Main Engine, a quick-look impact assessment of the Synthesis Group Report, and a detailed assessment of the Synthesis Group Report. The results of these KSC LTFOS team efforts are included. The most recent study task effort was a detailed assessment of the Synthesis Group Report. The assessment was conducted to determine the impact on planetary launch and landing facilities and operations. The result of that effort is a report entitled 'Analysis of the Synthesis Group Report, its Architectures and their Impacts on PSS Launch and Landing Operations' and is contained in Appendix A. The report is structured in a briefing format with facing pages as opposed to a narrative style. A quick-look assessment of the Synthesis Group Report was conducted to determine the impact of implementing the recommendations of the Synthesis Group on KSC launch facilities and operations. The data was documented in a presentation format as requested by Kennedy Space Center Technology and Advanced Projects Office and is included in Appendix B. Appendix C is a white paper on the comparison of the functional testing of the RL-10 and Space Shuttle Main Engine. The comparison was undertaken to provide insight regarding common test requirements that would be applicable to Lunar and Mars Excursion Vehicles (LEV and MEV).

  2. Upgrading railroad test track, Pueblo, Colorado

    SciTech Connect

    Briggs, K. III; Chamberlain, K.

    1997-01-01

    The railroad test track (RTT) at the Transportation Technology Center (TTC) in Pueblo, Colo., was constructed in the early 1970s to support high-speed testing of new railroad rolling stock. Through the years it has been used to test a wide range of railroad passenger and freight cars and locomotives. Now, 20 years later, a new high-speed train set is being procured by Amtrak for service in the improved Northeast Corridor. The test facilities at Pueblo will play an important role in acceptance and safety testing of new high-speed train sets in the US. The Federal Railroad Administration (FRA) commissioned a study to review the existing condition of the test track and to make recommendations as to possible improvement options so that the facility would be able to test current and future generations of high-speed rail equipment. This paper describes the condition of the test track and explores ways in which it may be modified to accommodate the testing of high-speed train technologies in the near future and into the next century.

  3. SSBRP User Operations Facility (UOF) Overview and Development Strategy

    NASA Technical Reports Server (NTRS)

    Picinich, Lou; Stone, Thom; Sun, Charles; Windrem, May; Givens, John J. (Technical Monitor)

    1995-01-01

    This paper will present the Space Station Biological Research Project (SSBRP) User Operations Facility (UOF) architecture and development strategy. A major element of the UOF at NASA Ames Research Center, the Communication and Data System (CDS) will be the primary focus of the discussions. CDS operational, telescience, security, and development objectives will be discussed along with CDS implementation strategy. The implementation strategy discussions will include: Object Oriented Analysis & Design, System & Software Prototyping, and Technology Utilization. A CDS design overview that includes: CDS Context Diagram, CDS Architecture, Object Models, Use Cases, and User Interfaces will also be presented. CDS development brings together "cutting edge" technologies and techniques such as: object oriented development, network security, multimedia networking, web-based data distribution, JAVA, and graphical user interfaces. Use of these "cutting edge" technologies and techniques translates directly to lower development and operations costs.

  4. Five years operating experience at the Fast Flux Test Facility

    SciTech Connect

    Baumhardt, R. J.; Bechtold, R. A.

    1987-04-01

    The Fast Flux Test Facility (FFTF) is a 400 Mw(t), loop-type, sodium-cooled, fast neutron reactor. It is operated by the Westinghouse Hanford Company for the United States Department of Energy at Richland, Washington. The FFTF is a multipurpose test reactor used to irradiate fuels and materials for programs such as Liquid Metal Reactor (LMR) research, fusion research, space power systems, isotope production and international research. FFTF is also used for testing concepts to be used in Advanced Reactors which will be designed to maximize passive safety features and not require complex shutdown systems to assure safe shutdown and heat removal. The FFTF also provides experience in the operation and maintenance of a reactor having prototypic components and systems typical of large LMR (LMFBR) power plants. The 5 year operational performance of the FFTF reactor is discussed in this report. 6 refs., 10 figs., 2 tabs.

  5. Personnel Access Control System Evaluation for National Ignition Facility Operations

    SciTech Connect

    Altenbach, T; Brereton, S.; Hermes, G.; Singh, M.

    2001-06-01

    The purpose of this document is to analyze the baseline Access Control System for the National Ignition Facility (NIF), and to assess its effectiveness at controlling access to hazardous locations during full NIF operations. It reviews the various hazards present during a NIF shot sequence, and evaluates the effectiveness of the applicable set of controls at preventing access while the hazards are present. It considers only those hazards that could potentially be lethal. In addition, various types of technologies that might be applicable at NIF are reviewed, as are systems currently in use at other facilities requiring access control for safety reasons. Recommendations on how this system might be modified to reduce risk are made.

  6. Operational Concept for the Smart Landing Facility (SLF)

    NASA Technical Reports Server (NTRS)

    Thompson, S. D.; Bussolari, S. R.

    2001-01-01

    The purpose of this document is to describe an operational concept for the Smart Landing Facility (SLF). The SLF is proposed as a component of the Small Aircraft Transportation System (SATS) and is envisioned to utilize Communication, Navigation, Surveillance and Air Traffic Management (CNS/ATM) technologies to support higher-volume air traffic operations in a wider variety of weather conditions than are currently possible at airports without an Air Traffic Control Tower (ATCT) or Terminal Radar Approach Control (TRACON). In order to accomplish this, the SLF will provide aircraft sequencing and separation within its terminal airspace (the SLF traffic area) and on the airport surface. The approach taken in this report is to first define and describe the SLF environment and the type of operations and aircraft that must be supported. Services currently provided by an ATCT and TRACON are reviewed and assembled into a set of high-level operational functions. A description of the applicable CNS/ATM technologies that have been deployed in the NAS (National Airspace System) or have been demonstrated to be operationally feasible is presented. A candidate SLF system concept that employs the CNS/ATM technologies is described. This is followed by SLF operational scenarios for minimally-equipped aircraft and for aircraft fully-equipped to make full use of SLF services. An assessment is made of the SLF technology and key research issues are identified.

  7. 23 CFR 646.210 - Classification of projects and railroad share of the cost.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Pursuant to 23 U.S.C. 130(b), and 49 CFR 1.48: (1) Projects for grade crossing improvements are deemed to... 23 Highways 1 2013-04-01 2013-04-01 false Classification of projects and railroad share of the... ENGINEERING AND TRAFFIC OPERATIONS RAILROADS Railroad-Highway Projects § 646.210 Classification of...

  8. 49 CFR 1.89 - Delegations to the Federal Railroad Adminstrator.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false Delegations to the Federal Railroad Adminstrator... DELEGATION OF POWERS AND DUTIES Operating Administrations § 1.89 Delegations to the Federal Railroad Adminstrator. The Federal Railroad Administrator is delegated authority to: (a) Carry out the functions...

  9. 49 CFR 1.89 - Delegations to the Federal Railroad Adminstrator.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Delegations to the Federal Railroad Adminstrator... DELEGATION OF POWERS AND DUTIES Operating Administrations § 1.89 Delegations to the Federal Railroad Adminstrator. The Federal Railroad Administrator is delegated authority to: (a) Carry out the functions...

  10. 49 CFR 1.89 - Delegations to the Federal Railroad Adminstrator.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false Delegations to the Federal Railroad Adminstrator... DELEGATION OF POWERS AND DUTIES Operating Administrations § 1.89 Delegations to the Federal Railroad Adminstrator. The Federal Railroad Administrator is delegated authority to: (a) Carry out the functions...