Science.gov

Sample records for regulatory commission staff

  1. NRC (Nuclear Regulatory Commission) staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    SciTech Connect

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved.

  2. 77 FR 74181 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of ISO New England Inc.: NEPOOL...

  3. 78 FR 36183 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the South Carolina Regional...

  4. 77 FR 11531 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Midwest Independent Transmission...

  5. 78 FR 4406 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the South Carolina Regional...

  6. 78 FR 36770 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-19

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  7. 77 FR 59184 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives ] notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc.:...

  8. 78 FR 32386 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services,...

  9. 77 FR 63308 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services,...

  10. 78 FR 24193 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  11. 78 FR 28839 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  12. 77 FR 73645 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services,...

  13. 77 FR 14777 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc.:...

  14. 78 FR 21927 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the ] transmission planning activities of the Southern Company Services,...

  15. 78 FR 39728 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  16. 78 FR 18330 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  17. 78 FR 38313 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  18. 77 FR 21978 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the...

  19. 77 FR 50492 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  20. 77 FR 73645 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  1. 77 FR 38045 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  2. 77 FR 28869 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc.: 2012...

  3. 77 FR 31004 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  4. 77 FR 47620 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, LLC (PJM): PJM...

  5. 77 FR 3764 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Midwest Independent Transmission System...

  6. 77 FR 42300 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  7. 77 FR 64983 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  8. 77 FR 16221 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  9. 76 FR 76157 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  10. 77 FR 58376 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  11. 77 FR 38046 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc.: 2012...

  12. 77 FR 34034 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  13. 76 FR 60820 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Midwest Independent Transmission System...

  14. 77 FR 37665 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the North Carolina Transmission Planning...

  15. 77 FR 40606 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  16. 77 FR 6556 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  17. 77 FR 21765 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  18. 77 FR 24485 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following...

  19. Nuclear Regulatory Commission information digest

    SciTech Connect

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  20. 77 FR 52020 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... information, contact Jesse Hensley, Office of Energy Market Regulation, Federal Energy Regulatory Commission... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy...

  1. 78 FR 26361 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of ISO New England Inc., New York...

  2. 77 FR 30003 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  3. 77 FR 3765 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator,...

  4. 78 FR 14783 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-07

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of ISO New England Inc., New York...

  5. 77 FR 42717 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the PJM Interconnection, L.L.C....

  6. 77 FR 16221 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  7. 78 FR 37214 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc. and...

  8. 77 FR 30003 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): Combined...

  9. 77 FR 70160 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  10. 77 FR 36532 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  11. 76 FR 66060 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  12. 77 FR 60980 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Mid-Continent Area Power Pool (MAPP) and...

  13. 77 FR 75630 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of ISO New England Inc., New York Independent...

  14. 77 FR 65680 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  15. 77 FR 35959 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following teleconference related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): Seams FERC...

  16. 77 FR 19011 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  17. 77 FR 75630 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  18. 77 FR 64982 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): Midwest...

  19. 77 FR 64332 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of ISO New England Inc., New York Independent...

  20. 77 FR 37664 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  1. 76 FR 66061 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings: of...): MISO Planning Advisory Committee, October 25, 2011, 9 a.m.-4 p.m., Local Time. MISO RECB Task...

  2. 77 FR 42718 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): ] Order...

  3. 77 FR 50098 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings and/or teleconferences related to the transmission planning activities of the Southwest Power Pool,...

  4. 78 FR 9688 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  5. 77 FR 63307 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): Seams FERC...

  6. 77 FR 24486 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  7. 77 FR 16221 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  8. 77 FR 12277 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  9. 77 FR 34378 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  10. 77 FR 52714 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  11. 76 FR 64343 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of ISO New England Inc.: Order 1000: NEPOOL...

  12. 76 FR 64083 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): SPP...

  13. 77 FR 50097 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings and/or teleconferences related to the transmission planning activities of the Southwest Power Pool,...

  14. 77 FR 71584 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  15. 77 FR 42490 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings and/or teleconferences related to the transmission planning activities of the Southwest Power Pool,...

  16. 77 FR 50097 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  17. 77 FR 41181 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-12

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of New York Independent System Operator, Inc.: Joint...

  18. 76 FR 64939 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings:...

  19. 77 FR 60980 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting...

  20. Report to the Nuclear Regulatory Commission from the staff panel on the Commission's determination of an Extraordinary Nuclear Occurrence (ENO)

    SciTech Connect

    1980-01-01

    The Panel finds that the first criterion, pertaining to whether the accident caused a discharge of radioactive material or levels of radiation offsite as defined in 10 CFR 140.84, has not been met. It further finds that there is presently insufficient information to support any definitive finding as to whether or not the second criterion, relating to damage to persons or property offsite as defined in 10 CFR 140.85, has been met. Since the Panel has not found that both criteria have been met, it recommends that the Commission determine that the accident at Three Mile Island did not constitute an extraordinary nuclear occurrence.

  1. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  2. 76 FR 63921 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ...Energy Service Company. FOR MORE INFORMATION CONTACT: Jonathan Fernandez, Office of Energy Market... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy...

  3. 76 FR 7839 - Notice of Commission and Commission Staff Attendance at ISO/RTO Council and Regional State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... Energy Regulatory Commission Notice of Commission and Commission Staff Attendance at ISO/RTO Council and... of the Commission and Commission staff may attend the following ISO/RTO Council and Regional State..., RTO/ISO Performance Metrics. For more information, contact Sandra Waldstein, Office of...

  4. Securities and Exchange Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... [Securities and Exchange Commission Semiannual Regulatory Agenda ] Part XXIII Securities and Exchange Commission Semiannual Regulatory Agenda ] SECURITIES AND EXCHANGE COMMISSION (SEC) SECURITIES AND EXCHANGE COMMISSION 17 CFR Ch. II Regulatory Flexibility Agenda AGENCY: Securities and Exchange Commission. ACTION: Semiannual regulatory...

  5. 77 FR 791 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... Interconnection, L.L.C. For more information, contact Jonathan Fernandez, Office of Energy Market Regulation... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance December 29, 2011. The Federal...

  6. Nuclear Regulatory Commission issuances

    SciTech Connect

    Not Available

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  7. Nuclear Regulatory Commission Issuances

    SciTech Connect

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  8. Nuclear Regulatory Commission issuances

    SciTech Connect

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  9. Nuclear Regulatory Commission Issuances

    SciTech Connect

    Not Available

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  10. Nuclear Regulatory Commission issuances

    SciTech Connect

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  11. Nuclear Regulatory Commission issuances

    SciTech Connect

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  12. Nuclear Regulatory Commission Information Digest, 1991 edition

    SciTech Connect

    Olive, K L

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

  13. Securities and Exchange Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... [The Regulatory Plan and Unified Agenda of Federal Regulatory and Deregulatory Actions] Part XXIV Securities and Exchange Commission Semiannual Regulatory Agenda ] SECURITIES AND EXCHANGE COMMISSION (SEC) SECURITIES AND EXCHANGE COMMISSION 17 CFR Ch. II Regulatory Flexibility Agenda AGENCY: Securities and Exchange Commission. ACTION:...

  14. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2,...

  15. 17 CFR 171.28 - Participation by Commission staff.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... staff. 171.28 Section 171.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION..., Membership Denial and Registration Actions § 171.28 Participation by Commission staff. The Division of.... The Commission shall by order establish a supplementary briefing schedule for the Commission staff...

  16. 76 FR 23516 - Availability of E-Tag Information to Commission Staff

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    .... \\24\\ Regulations Implementing the National Environmental Policy Act, Order No. 486, 52 FR 47,897 (Dec... Energy Regulatory Commission 18 CFR Part 366 Availability of E-Tag Information to Commission Staff AGENCY... wholesale markets. This information will aid the Commission in market monitoring and preventing...

  17. 77 FR 76367 - Availability of E-Tag Information to Commission Staff

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ...\\ 77 FR 12760 (Mar. 2, 2012). II. Discussion A. Legal Authority To Require E-Tag Access 1. E-Tag NOPR... Energy Regulatory Commission 18 CFR Part 366 Availability of E-Tag Information to Commission Staff AGENCY... and receive e-Tags addressed to the Commission. The information made available under this Final...

  18. 78 FR 7772 - Notice of Commissioner and Staff Attendance at National Association of Regulatory Utility...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at National Association of... following meeting: FERC/National Association of Regulatory Utility Commissioners Sunday...

  19. 75 FR 43963 - Notice of Commissioner and Staff Attendance at National Association of Regulatory Utility...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at National Association of Regulatory Utility Commissioners Summer Committee Meetings July 20, 2010. The Federal Energy...

  20. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is...

  1. Federal Trade Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... No. 12866 ``Regulatory Planning and Review'' of September 30, 1993, 58 FR 51735 (Oct. 4, 1993). Since... Final Rule, which the Commission issued jointly with the Federal Reserve on January 15, 2010 (75 FR 2724... Regulatory Plan narrative. 74 FR 64137, 64366. The Commission has also responded to the optional...

  2. 17 CFR 9.26 - Participation of Commission staff.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... staff. 9.26 Section 9.26 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES... Respect to Appeals § 9.26 Participation of Commission staff. Within twenty days after receipt of the..., no employee of the Division(s) filing the notice may thereafter make any communication relating...

  3. Nuclear Regulatory Commission issuances, September 1995. Volume 42, Number 3

    SciTech Connect

    1995-09-01

    This book contains an issuance of the Atomic Safety and Licensing Board and a Director`s Decision, both of the US Nuclear Regulatory Commission. The issuance concerns the dismissal of a case by adopting a settlement reached by the Staff of the Nuclear Regulatory Commission and a Radiation Safety Officer of a hospital in which the safety officer pled guilty to deliberate misconduct. The Director`s Decision was to deny a petition to impose a fine on Tennessee Valley Authority concerning alleged harassment of the petitioner and to appoint an independent arbitration board to review all past complaints filed against TVA concerning the Watts Bar Nuclear Plant.

  4. Jaczko to resign as chair of Nuclear Regulatory Commission

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-05-01

    Gregory Jaczko, chair of the U.S. Nuclear Regulatory Commission (NRC), announced on 21 May that he will resign once his successor is appointed. His resignation will end a stormy 3-year chairmanship during which he was accused of bullying NRC staff, lying to Congress, and being too close to the political process. Jaczko formerly served as science advisor to Sen. Harry Reid (D-Nev.). As NRC chair, Jaczko halted the commission's license application review for storing nuclear waste at Nevada's Yucca Mountain. In addition, during his NRC tenure the commission focused on identifying and implementing lessons from Japan's Fukushima Daiichi reactors damaged by the 2011 tsunami.

  5. Nuclear Regulatory Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ...) 2010, less the amounts appropriated from the Nuclear Waste Fund, amounts appropriated for Waste... agenda on April 26, 2010 (75 FR 21960). For this edition of the NRC's regulatory agenda, the most... publication of the last NRC semiannual agenda on April 26, 2010 (75 FR 21960). Within each group, the...

  6. 11. Historic American Buildings Survey Commission of Fine Arts Staff, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Historic American Buildings Survey Commission of Fine Arts Staff, ca. 1971 Photocopy of Drawings by Bruce Price & de Sibour, 1908 MARQUISE DRAWINGS: SECTION AND ELEVATION - Clarence Moore House, 1746 Massachusetts Avenue Northwest, Washington, District of Columbia, DC

  7. 5. Historic American Buildings Survey Commission of Fine Arts Staff, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Historic American Buildings Survey Commission of Fine Arts Staff, Photographer, 1973 WINTER GARDEN FROM BREAKFAST ROOM - Larz Anderson House, 2118 Massachusetts Avenue Northwest, Washington, District of Columbia, DC

  8. 78 FR 22418 - Reassignment of Commission Staff Responsibilities and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ... Commission Staff Responsibilities and Delegations of Authority AGENCY: Commodity Futures Trading Commission... responsibilities, including delegations of authority, resulting from its recent reorganization of Commission staff... reassigned its staff and responsibilities to the newly established Division of Swap Dealer and...

  9. 77 FR 29634 - Notice of FERC Staff Attendance at the Louisiana Public Service Commission's Business and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... meeting is open to the public. For more information, contact Patrick Clarey, Office of Energy Market... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Louisiana Public Service...

  10. 75 FR 52939 - Supplemental Notice Regarding Staff Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... Energy Regulatory Commission Supplemental Notice Regarding Staff Technical Conference August 20, 2010... Regulatory Commission (Commission) directed staff to convene a technical conference regarding California... Room. The technical conference will be led by Commission staff. Commissioners may attend the...

  11. 13. Historic American Buildings Survey Commission of Fine Arts Staff, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Historic American Buildings Survey Commission of Fine Arts Staff, 1972 Photocopy of plans by J. L. S. Jennings, Jr., CFA, Delineator, 1973 GROUND-FLOOR AND FIRST-SECOND- FLOOR PLANS - Clarence Moore House, 1746 Massachusetts Avenue Northwest, Washington, District of Columbia, DC

  12. Steam Generator tube integrity -- US Nuclear Regulatory Commission perspective

    SciTech Connect

    Murphy, E.L.; Sullivan, E.J.

    1997-02-01

    In the US, the current regulatory framework was developed in the 1970s when general wall thinning was the dominant degradation mechanism; and, as a result of changes in the forms of degradation being observed and improvements in inspection and tube repair technology, the regulatory framework needs to be updated. Operating experience indicates that the current U.S. requirements should be more stringent in some areas, while in other areas they are overly conservative. To date, this situation has been dealt with on a plant-specific basis in the US. However, the NRC staff is now developing a proposed steam generator rule as a generic framework for ensuring that the steam generator tubes are capable of performing their intended safety functions. This paper discusses the current U.S. regulatory framework for assuring steam generator (SG) tube integrity, the need to update this regulatory framework, the objectives of the new proposed rule, the US Nuclear Regulatory Commission (NRC) regulatory guide (RG) that will accompany the rule, how risk considerations affect the development of the new rule, and some outstanding issues relating to the rule that the NRC is still dealing with.

  13. Institutional Radiation Safety Committee--Nuclear Regulatory Commission. Final rule.

    PubMed

    1982-09-13

    The Nuclear Regulatory Commission (NRC) is amending its regulations regarding hospitals licensed to use radioactive byproduct material for human applications. Currently, such a license requires that the hospital have a Medical Isotopes Committee to review clinical aspects of the use of radioactive materials within the hospital. The amendment requires instead a Radiation Safety Committee with a simplified membership that will focus on the radiation safety of workers and the general public. The rule change acknowledges the Food and Drug Administration's role in regulating the safety and effectiveness of radioactive drugs with respect to the patient. The membership of the new Radiation Safety Committee will include the hospital management and the nursing staff in decisions affecting radiation safety at the hospital and will be easier for smaller hospitals to recruit. PMID:10259789

  14. Nuclear Regulatory Commission issuances, October 1993. Volume 38, No. 4

    SciTech Connect

    Not Available

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners` motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners` have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission`s Memorandum and Order are included.

  15. 77 FR 34379 - Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold a...

  16. 46 CFR 502.135 - Subpoena of Commission staff personnel, documents or things.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 9 2011-10-01 2011-10-01 false Subpoena of Commission staff personnel, documents or things. 502.135 Section 502.135 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS RULES OF PRACTICE AND PROCEDURE Subpoenas § 502.135 Subpoena of Commission staff personnel, documents or things. (a) A subpoena for the...

  17. 46 CFR 502.135 - Subpoena of Commission staff personnel, documents or things.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 9 2013-10-01 2013-10-01 false Subpoena of Commission staff personnel, documents or things. 502.135 Section 502.135 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS RULES OF PRACTICE AND PROCEDURE Subpoenas § 502.135 Subpoena of Commission staff personnel, documents or things. (a) A subpoena for the...

  18. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect

    1996-07-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices.

  19. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    SciTech Connect

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  20. 78 FR 14531 - Availability of E-Tag Information to Commission Staff; Notice Specifying Webregistry Code

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ... Commission as an addressee on the e- Tags. \\1\\ Availability of E-Tag Information to Commission Staff, 77 FR... Authors (through their Agent Service) and Balancing Authorities (through their Authority Service) to...

  1. Federal Trade Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... and Review'' of September 30, 1993, 58 FR 51735 (Oct. 4, 1993). This edition of the Unified Agenda of..., ``Federalism,'' of August 4, 1999, 64 FR 43255 (Aug. 10, 1999), which does not apply to independent regulatory...'s Telemarketing Sales Rule (TSR or Rule) to address the sale of debt relief services (74 FR...

  2. 44 CFR 351.21 - The Nuclear Regulatory Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false The Nuclear Regulatory... Assignments § 351.21 The Nuclear Regulatory Commission. (a) Assess NRC nuclear facility (e.g., commercial... protect the health and safety of the public. (b) Verify that nuclear facility licensee emergency plans...

  3. 44 CFR 351.21 - The Nuclear Regulatory Commission.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false The Nuclear Regulatory... Assignments § 351.21 The Nuclear Regulatory Commission. (a) Assess NRC nuclear facility (e.g., commercial... protect the health and safety of the public. (b) Verify that nuclear facility licensee emergency plans...

  4. 44 CFR 351.21 - The Nuclear Regulatory Commission.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true The Nuclear Regulatory... Assignments § 351.21 The Nuclear Regulatory Commission. (a) Assess NRC nuclear facility (e.g., commercial... protect the health and safety of the public. (b) Verify that nuclear facility licensee emergency plans...

  5. 44 CFR 351.21 - The Nuclear Regulatory Commission.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false The Nuclear Regulatory... Assignments § 351.21 The Nuclear Regulatory Commission. (a) Assess NRC nuclear facility (e.g., commercial... protect the health and safety of the public. (b) Verify that nuclear facility licensee emergency plans...

  6. 44 CFR 351.21 - The Nuclear Regulatory Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false The Nuclear Regulatory... Assignments § 351.21 The Nuclear Regulatory Commission. (a) Assess NRC nuclear facility (e.g., commercial... protect the health and safety of the public. (b) Verify that nuclear facility licensee emergency plans...

  7. Transforming public utility commissions in the new regulatory environment: Some issues and ideas for managing change

    SciTech Connect

    Wirick, D.W.; Davis, V.W.; Burns, R.E.; Jones, D.N.

    1996-07-01

    In the face of sweeping changes in utility markets and regulatory practices, public utility commissions are being forced to change in fundamental ways--to substantially transform themselves rather than to make only incremental changes in their operations. Managing this process of radical change is complicated by the fact that for the foreseeable future some portions of utility markets (e.g., water utilities) will function much as they have before. Some envision commissions in the future that are more externally focussed, that rely more on dispute resolution than adjudicatory proceedings, that concentrate on identifying and understanding competitive markets, that are more automated, and that are more likely to question old assumptions and definitions. This report identifies the considerations commissions might apply for identifying what mix of skills or fields of experise should compromise the technical staff. Factors are also identified which point towards a sectoral arrangement of staff and those factors which point toward a functional approach.

  8. Indexes to Nuclear Regulatory Commission Issuances

    SciTech Connect

    1996-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

  9. Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1--December 31, 1996. Volume 44, Pages 1--432

    SciTech Connect

    1997-10-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors` Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM.

  10. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    SciTech Connect

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  11. 77 FR 12760 - Availability of E-Tag Information to Commission Staff

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ..., 2011, the Commission issued a Notice of Proposed Rulemaking (76 FR 23516) proposing to require the Commission-certified Electric Reliability Organization to make available to Commission staff, on an ongoing...://www.ferc.gov . Documents created electronically using word processing software should be filed...

  12. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect

    1996-08-19

    This document is the organizational chart for the US NRC. It contains organizational structure and functional statements for the following: (1) the Commission, (2) committees and boards, (3) staff offices, (4) office of the Inspector General, (5) executive director for operations, (6) program offices, and (7) regional offices.

  13. Inspection and enforcement at the US Nuclear Regulatory Commission

    SciTech Connect

    Troskoski, W.M.

    1996-12-31

    Application of the U.S. Nuclear Regulatory Commission`s (NRC) inspection and enforcement programs related to nuclear criticality safety (NCS) are explored. The flowdown of regulatory requirements are traced from Title 10, Code of Federal Regulations, Part 70 (10 CFR 70), {open_quotes}Domestic Licensing of Special Nuclear Material,{close_quotes} through individual license requirements that include specific safety limits, management controls, and safety programs. The roles of documentation and auditability to demonstrate compliance with those license requirements are examined. NRC general expectations are briefly summarized.

  14. U.S. Nuclear Regulatory Commission natural analogue research program

    SciTech Connect

    Kovach, L.A.; Ott, W.R.

    1995-09-01

    This article describes the natural analogue research program of the U.S. Nuclear Regulatory Commission (US NRC). It contains information on the regulatory context and organizational structure of the high-level radioactive waste research program plan. It also includes information on the conditions and processes constraining selection of natural analogues, describes initiatives of the US NRC, and describes the role of analogues in the licensing process.

  15. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    SciTech Connect

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  16. Audit of the Federal Energy Regulatory Commission leased warehouse space

    SciTech Connect

    1996-05-24

    The Federal Energy Regulatory Commission (Commission) stores furniture, automated data processing equipment, and office supplies in a warehouse located in Landover, Maryland. The annual operating cost for this space (25,830 square feet) approximates $455,000-$245,000 in lease costs and $210,000 for contractor personnel. The purpose of the audit was to assess the effectiveness of the Commission`s use of warehouse space. The specific audit objective was to determine whether the Commission was minimizing the need for warehouse space for the storage of office supplies, furniture, and equipment. Federal Property Management Regulations and prudent business practices require Government agencies to minimize their need for space. More space was being leased than needed because Commission officials understood that they were obligated by terms of the lease to -pay for the space until March 31, 2002. We found, however, that there was a misunderstanding by officials, and that the Commission could at any time relinquish warehouse space by giving 120 days notice. Because of this misunderstanding and the recent relocation of the Commission to a newly furnished facility, about 16,000 square feet of warehouse space was being used to store furniture and equipment that was no longer needed by the Commission. An additional 6,000 square feet of space was used to store office supplies instead of using a more frequent ordering program that would reduce space requirements.

  17. The U.S. Nuclear Regulatory Commission's Strategy for Revising the RIA Acceptance Criteria

    SciTech Connect

    Clifford, Paul M.

    2007-07-01

    The U.S. Nuclear Regulatory Commission (NRC) has issued interim criteria and guidance for the reactivity-initiated accident (RIA) within the latest revision to NUREG-0800, 'Standard Review Plan' (SRP), Section 4.2, 'Fuel System Design', Appendix B (Revision 03, March 2007). The purpose of this paper is as follows: 1. present a change in regulatory staff position regarding the requirements of 10 CFR 50, Appendix A, General Design Criteria 28 (GDC28) and changes in regulatory guidance provided in Regulatory Guide (RG) 1.77, RG 1.195, RG 1.183, and previous versions of NUREG-0800 SRP; 2. describe the implementation strategy and schedule for both new reactors and the existing fleet; and 3. encourage licensees and nuclear fuel vendors to (1) develop improved core physics analytical methods to allow a more deliberate transition to the new fuel cladding failure criteria and (2) develop the technical basis to address the new core coolability criteria. (authors)

  18. KWOC (Key-Word-Out-of-Context) Index of US Nuclear Regulatory Commission Regulatory Guide Series

    SciTech Connect

    Jennings, S.D.

    1990-04-01

    To meet the objectives of the program funded by the Department of Energy (DOE)-Nuclear Energy (NE) Technology Support Programs, the Performance Assurance Project Office (PAPO) administers a Performance Assurance Information Program that collects, compiles, and distributes program-related information, reports, and publications for the benefit of the DOE-NE program participants. THE KWOC Index of US Nuclear Regulatory Commission Regulatory Guide Series'' is prepared as an aid in searching for specific topics in the US Nuclear Regulatory Commission, Regulatory Guide Series.

  19. Nuclear Regulatory Commission issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1994--December 31, 1994. Volume 40, Pages 1--387

    SciTech Connect

    1994-12-31

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. This book covers the following: issuances of the NRC; issuances of the Atomic Safety and Licensing Boards; and issuances of Directors` decisions.

  20. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect

    1997-11-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

  1. 46 CFR 502.135 - Subpena of Commission staff personnel, documents or things.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Subpena of Commission staff personnel, documents or... appeal is filed within ten (10) days after date of issuance of such rulings or unless the Commission, on.... Replies to appeals may be filed within ten (10) days. No ruling of the presiding officer shall...

  2. 46 CFR 502.135 - Subpoena of Commission staff personnel, documents or things.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 9 2014-10-01 2014-10-01 false Subpoena of Commission staff personnel, documents or... appeal is filed within ten (10) days after date of issuance of such rulings or unless the Commission, on.... Replies to appeals may be filed within ten (10) days. No ruling of the presiding officer shall...

  3. 46 CFR 502.135 - Subpoena of Commission staff personnel, documents or things.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 9 2012-10-01 2012-10-01 false Subpoena of Commission staff personnel, documents or... appeal is filed within ten (10) days after date of issuance of such rulings or unless the Commission, on.... Replies to appeals may be filed within ten (10) days. No ruling of the presiding officer shall...

  4. Nuclear Regulatory Commission Information Digest 1994 edition. Volume 6

    SciTech Connect

    Stadler, L.

    1994-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRCs regulatory responsibility the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear-and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1993, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  5. Nuclear Regulatory Commission Information Digest 1992 edition. Volume 4

    SciTech Connect

    Olive, K

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  6. NRRI summary of New York Public Service Commission: Staff investigation of Orange and Rockland Utilities, Inc.

    SciTech Connect

    1995-12-31

    In June 1995, the New York Public Service Commission (NYPSC) released a Staff investigation of Orange and Rockland Utilities, Inc. (O&R). The primary focus of the Staffs investigation was the Corporate Policy and External Affairs Department, a restricted disbursements account, the Internal Auditing Department, and O&R officer malfeasance. The Staffs` investigation uncovered widespread, alleged instances of lax internal controls, unethical and illegal actions, and lavish officer behavior. In addition, the Staff investigated O&R`s internal control and purchasing functions. The Staff proposed a series of recommendations to improve the Company`s internal control, purchasing, ethical, climate and addressed the issue of a New York ratepayer reimbursement. The Staffs findings and recommendations were presented in the form of a report, entitled Staff Investigation of Orange and Rockland Utilities, Inc. This article summarizes the Report.

  7. Nuclear Regulatory Commission Issuances: February 1995. Volume 41, Number 2

    SciTech Connect

    1995-02-01

    This book contains an issuance of the Nuclear Regulatory Commission and a Director`s Decision. The issuance concerns consideration by the Commission of appeals from both the Initial Decision and a Reconsideration Order issued by the Presiding Officer involving two materials license amendment applications filed by the University of Missouri. The Director`s Decision from the Office of Enforcement denies petitions filed by Northeast Utilities employees requesting that accelerated enforcement action be taken against Northeast Utilities for activities concerned with NU`s fitness-for-duty program.

  8. Nuclear Regulatory Commission issuances, January 1997. Volume 45, Number 1

    SciTech Connect

    1997-01-01

    This book contains issuances of the Atomic Safety and Licensing Board, Nuclear Regulatory Commission and Director`s Decision for January 1997. The issuances concern Sequoyah Fuels Corporation and General Atomics Gore, Oklahoma Site decontamination and decommissioning funding; Louisiana Energy Services, Claiborne Enrichment Center denies appeal to review emergency planning; General Public Utilities Nuclear Corporation, Oyster Creek Nuclear Generating station, challenges to technical specifications concerning spent fuel pool; and Consumers Power Company, Palisades Nuclear Plant dry cask storage of spent nuclear fuel.

  9. 75 FR 53297 - Supplemental Notice Regarding Staff Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... Energy Regulatory Commission Supplemental Notice Regarding Staff Technical Conference August 23, 2010... Docket No. ER10-1401-000, the Federal Energy Regulatory Commission (Commission) directed staff to convene... led by Commission staff. Commissioners may attend the conference. All interested persons are...

  10. 76 FR 9345 - Brian Hunter; Third Supplemental Notice of Designation of Commission Staff

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ..., Energy Market Oversight, Audits, and Financial Regulation. On May 6, 2008, in a Supplemental Notice of... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Brian Hunter; Third Supplemental Notice of Designation of Commission...

  11. 10 CFR Appendix D to Part 20 - United States Nuclear Regulatory Commission Regional Offices

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false United States Nuclear Regulatory Commission Regional Offices D Appendix D to Part 20 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Pt. 20, App. D Appendix D to Part 20—United States Nuclear Regulatory Commission Regional Offices Address Telephone (24 hour) E-Mail...

  12. 10 CFR Appendix D to Part 20 - United States Nuclear Regulatory Commission Regional Offices

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false United States Nuclear Regulatory Commission Regional Offices D Appendix D to Part 20 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Pt. 20, App. D Appendix D to Part 20—United States Nuclear Regulatory Commission Regional...

  13. 10 CFR Appendix D to Part 20 - United States Nuclear Regulatory Commission Regional Offices

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false United States Nuclear Regulatory Commission Regional Offices D Appendix D to Part 20 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Pt. 20, App. D Appendix D to Part 20—United States Nuclear Regulatory Commission Regional...

  14. 10 CFR Appendix D to Part 20 - United States Nuclear Regulatory Commission Regional Offices

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false United States Nuclear Regulatory Commission Regional Offices D Appendix D to Part 20 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Pt. 20, App. D Appendix D to Part 20—United States Nuclear Regulatory Commission Regional...

  15. 10 CFR Appendix D to Part 20 - United States Nuclear Regulatory Commission Regional Offices

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false United States Nuclear Regulatory Commission Regional Offices D Appendix D to Part 20 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Pt. 20, App. D Appendix D to Part 20—United States Nuclear Regulatory Commission Regional...

  16. 78 FR 5797 - Availability of e-Tag Information to Commission Staff; Notice Specifying webRegistry Code

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ...-Tags. \\1\\ Availability of E-Tag Information to Commission Staff, 77 FR 76367 (Dec. 28. 2012), 141 FERC ] 61,235 (2012) (FR). In Order No. 771, the Commission stated that, ``following issuance of this...

  17. Staff-Training in the Illinois Youth Commission. Final Report. Volume III.

    ERIC Educational Resources Information Center

    Kiefer, George W.

    The last of three volumes on inservice education for correctional personnel in Illinois, this report deals with the extent, content, and importance of inservice staff training within the Illinois Youth Commission (IYC), an agency providing rehabilitative and custodial services for juvenile delinquents. Functions and components of the three IYC…

  18. Tennessee Higher Education Commission Staff Study. Re: House Resolution No. 107.

    ERIC Educational Resources Information Center

    Tennessee Higher Education Commission, Nashville.

    The Tennessee Higher Education Commission conducted a study of the salaries of teaching staff and faculty in response to Tennessee House Resolution 107 on sexual discrimination. This study is the first known statewide effort to determine academic salaries. A multiple regression analysis model was used. Among the general findings were that: (1)…

  19. Nuclear Regulatory Commission issuances, May 1993. Volume 37, No. 5

    SciTech Connect

    Not Available

    1993-05-01

    This report contains the issuances received during the specified period (May 1993) from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not deemed a part of these opinions or have any independent legal significance. Contents of this document include an Issuance of the Nuclear Regulatory Commission with respect to the Sacramento Municipal Utility District and Issuances of Directors` Decisions concerning the Interstate Nuclear Service Corporation; Niagara Mohawk Power Corporation; and Texas Utilities Electric Company, et al. and All Nuclear Power Plants with Thermo-Lag Fire Barriers.

  20. 77 FR 44609 - Notice of Commissioner and Staff Attendance at the National Association of Regulatory Utility...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... Regulatory Utility Commissioners 2012 Summer Committee Meetings The Federal Energy Regulatory Commission... found at http://summer.narucmeetings.org/agenda.cfm The discussions at these meetings, which are open...

  1. 75 FR 4547 - Notice of Commission Staff Attendance at North American Electric Reliability Corporation Meetings...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... Corporation Meetings From January-June 2010 January 21, 2010. The Federal Energy Regulatory Commission hereby..., 2010 (TBD). Tuesday--Wednesday, June 15-16, 2010 (TBD). NERC Operating Committee Meetings and its sub-committee meetings. Tuesday--Wednesday, March 16-17, 2010 (TBD). Tuesday--Wednesday, June 15-16, 2010...

  2. 76 FR 7839 - Notice of Commission Staff Attendance at North American Electric Reliability Corporation (NERC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... Corporation (NERC) Meetings from January-June 2011 The Federal Energy Regulatory Commission hereby gives..., NV (2) Tuesday-Wednesday, June 7-8 Toronto, ON, Canada (2) Tuesday-Thursday, June 28-30 Austin, TX (3...-Wednesday, March 8-9, Phoenix Convention Center-- North Building, Phoenix, AZ (2) Tuesday-Wednesday, June...

  3. 7 CFR 4284.906 - State laws, local laws, regulatory commission regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false State laws, local laws, regulatory commission...-Added Producer Grant Program General § 4284.906 State laws, local laws, regulatory commission regulations. If there are conflicts between this subpart and State or local laws or regulatory...

  4. 7 CFR 4284.906 - State laws, local laws, regulatory commission regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false State laws, local laws, regulatory commission...-Added Producer Grant Program General § 4284.906 State laws, local laws, regulatory commission regulations. If there are conflicts between this subpart and State or local laws or regulatory...

  5. 7 CFR 4284.906 - State laws, local laws, regulatory commission regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false State laws, local laws, regulatory commission...-Added Producer Grant Program General § 4284.906 State laws, local laws, regulatory commission regulations. If there are conflicts between this subpart and State or local laws or regulatory...

  6. Nuclear Regulatory Commission issuances, April 1995. Volume 41, Number 4

    SciTech Connect

    1995-04-01

    This book contains issuances of the Nuclear Regulatory Commission and of the Atomic Safety and Licensing Boards, and an issuance of the Director`s decision. The issuances concern a petition filed by Dr. James E Bauer seeking interlocutory Commission review of the Atomic Safety and Licensing Board`s order imposing several restrictions on Dr. Bauer; a denial of an Interveners` Petition for Review addressing the application of Babcock and Wilcox for a renewal of its Special Nuclear Materials License; granting a motion for a protective order, by Sequoyah Fuel Corporation and General Atomics, limiting the use of the protected information to those individuals participating in the litigation and for the purposes of the litigation only; granting a Petitioner`s petition for leave to intervene and request for a hearing concerning Georgia Institute of Technology (Georgia Tech Research Reactor) renewal of a facility license; and a denial of a petition filed by Mr. Ted Dougherty requesting a shutdown of the San Onofre Nuclear Generating Station based on concerns regarding the vulnerability of the plant to earthquakes and defensibility of the plant to a terrorist threat.

  7. 76 FR 61402 - Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ...The U.S. Nuclear Regulatory Commission (NRC) is announcing the availability of and requesting comment on draft NUREG-1614, Volume 5. ``U.S. Nuclear Regulatory Commission, FY 2012-2016 Strategic Plan,'' dated September 2011. The NRC's draft FY 2012-2016 strategic plan describes the agency's mission and strategic objective, which remain unchanged. The NRC's priority continues to be ensuring the......

  8. 75 FR 1088 - Notice of Availability of a Memorandum of Understanding Between the Nuclear Regulatory Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... and the Bureau of Land Management AGENCY: Nuclear Regulatory Commission. ACTION: Notice of.... Introduction The Nuclear Regulatory Commission (NRC) and the Bureau of Land Management (BLM) have finalized a..., or by e-mail to pdr.resource@nrc.gov . The ``Memorandum of Understanding between the Bureau of...

  9. Leak testing United States Nuclear Regulatory Commission type b packaging

    SciTech Connect

    Lacy, K.A.

    1995-12-31

    The Waste Isolation Pilot Plant (WTPP) is a one of its kind research and development facility operated by the Department of Energy, Carlsbad Area Office. Located in southeastern New Mexico, the WTPP is designed to demonstrate the safe, permanent disposal of transuranic (TRU) radioactive nuclear waste, accumulated from 40 years of nuclear weapons production. Before the waste can be disposed of, it must first be safely transported from generator storage sites to the WIPP. To accomplish this, the TRUPACT-II was designed and fabricated. This double containment, non-vented waste packaging successfully completed a rigorous testing program, and in 1989 received a Certificate of Compliance (C of C) from the Nuclear Regulatory Commission (NRC). Currently, the TRUPACT-II is in use at Idaho National Engineering Laboratory to transport waste on site for characterization. The DOE/CAO is responsible for maintaining the TRUPACT-II C of C. The C of C requires performance of nondestructive examination (NDE), e.g., visual testing (VT), dimensional inspections, Liquid Dye Penetrant testing (PT), and Helium Leak Detection (HLD). The Waste Isolation Division (WID) uses HLD for verification of the containment integrity. The following HLD tests are performed on annual basis or when required, i.e. repairs or component replacement: (1) fabrication verification leak tests on both the outer containment vessel (OCV) and the inner containment vessel (ICV); (2) assembly verification leak tests on the OCV and ICV upper main o-rings; and (3) assembly verification leak tests on the OCV and the ICV vent port plugs. These tests are addressed in detail as part of this presentation.

  10. Regulatory capture and the Rhode Island Public Utilities Commission toward a new regulatory theory

    SciTech Connect

    Hartley, D.W.; Leduc, E.C.

    1995-03-01

    Regulators operate in a constantly changing environment characterized by new technologies, increased competition in regulated fields, and heightened environmental awareness. In such an environment, they must maintain a balance between the customers` interest in low rates for safe and reliable utility service, and the need to maintain solvent utilities that have the ability to attract capital at a reasonable cost. Concentration on either end of that balance by a regulatory agency during any particular period brings almost inevitably, charges of unfairness by champions representing the other side of the balance. If, for example, a Public Utilities Commission (PUC) sees the need to concentrate on the financial health of the utilities under its jurisdiction, consumers will likely feel the sting of rate increases. In the author`s view, Capture Theory, a theory of regulatory behavior which held sway for decades, resulted from scholars viewing regulatory agencies during the part of a cycle of regulation, when the concentration was on that side of the issue. But even while the various forms of Capture Theory were ascendant in the mid-1970`s, events in the field of public utility regulation were serving to refute them all. {open_quotes}Instead of having the happy task of presiding over a process that seemed to bestow benefits upon everyone, regulators in the 1970`s were faced with the unpleasant duty of allocating misery among rival and intensely vocal groups.{close_quotes}

  11. Regulatory ratchet clicks, nukes are abandoned, but Nuclear Regulatory Commission envisions brighter future

    SciTech Connect

    Utroska, D.

    1982-04-01

    Nuclear power plant construction regulations issued after the Three Mile Island accident have affected 11 plants, only five of which remain committed to construction although all are in jeopardy. A review of the cancellations identifies prohibitive costs and financing problems due to the new regulations as the deciding factor. There are three classes of new rules: a probabilistic risk assessment within two years of receiving a construction permit, stronger containment structures, and more-sophisticated hydrogen-control features. The Nuclear Regulatory Commission (NRC) now appears to be joining the administration's goal of streamlining regulations, particularly in the areas of backfitting and final-design-approval rules based on standardization. Some observers are critical of the standardization approach because of plant complexity, but they foresee efforts toward simplification as manufacturers plan designs for reference approval. (DCK)

  12. 77 FR 66609 - Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Federal Energy Regulatory Commission Notice of FERC Staff Attendance October 31, 2012. Docket No. Pacifi... notice that on November 7, 2012, members of its staff will attend a meeting conducted by representatives... stakeholders and Commission staff's attendance is part of the Commission's ongoing outreach efforts....

  13. 77 FR 74844 - Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-18

    ... Energy Regulatory Commission Notice of FERC Staff Attendance PacifiCorp Docket No. ER13-64-000. Deseret... that on December 19, 2012, members of its staff will attend a meeting hosted by NV Energy, Inc... meeting is open to all stakeholders and Commission staff's attendance is part of the Commission's...

  14. 78 FR 16497 - Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Energy Regulatory Commission Notice of FERC Staff Attendance Docket No. PacifiCorp ER13-64-000 Deseret... its staff will attend a conference call conducted by representatives of California Independent System... stakeholders and Commission staff's attendance is part of the Commission's ongoing outreach efforts....

  15. Nuclear Regulatory Commission Issuance. Volume 39, No. 1

    SciTech Connect

    Not Available

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  16. Nuclear Regulatory Commission issuances. Volume 42, No. 4

    SciTech Connect

    1995-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  17. Nuclear Regulatory Commission Issuances. Volume 39, No. 2

    SciTech Connect

    Not Available

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director`s Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  18. Nuclear Regulatory Commission issuances. Volume 42, No. 6

    SciTech Connect

    1995-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  19. Nuclear Regulatory commission issuances, Volume 42, No. 5

    SciTech Connect

    1995-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  20. Nuclear Regulatory Commission issuances, December 1994. Volume 40, No. 6

    SciTech Connect

    1994-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  1. Nuclear Regulatory Commission issuances, December 1993. Volume 38, No. 6

    SciTech Connect

    Not Available

    1993-12-31

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  2. Nuclear Regulatory Commission issuances, March 1995. Volume 41, No. 3

    SciTech Connect

    1995-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  3. Nuclear Regulatory Commission issuances, April 1994. Volume 39, No. 4

    SciTech Connect

    Not Available

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  4. Nuclear Regulatory Commission issuances. Volume 38, No. 2

    SciTech Connect

    Not Available

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  5. Nuclear Regulatory Commission issuances, Volume 45, No. 2

    SciTech Connect

    1997-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director`s Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  6. Nuclear Regulatory Commission issuances, May 1995. Volume 41, No. 5

    SciTech Connect

    1995-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  7. Nuclear Regulatory Commission issuances. Volume 47, Number 3

    SciTech Connect

    1998-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The two issuances included here are: (1) the Commission issuance to the US Enrichment Corporation and (2) the Director`s Decision to the North Atlantic Energy Service Corporation.

  8. 77 FR 15142 - Updated Nuclear Regulatory Commission Fiscal Years 2008-2013 Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... 2012-2016 in the Federal Register for public comment on October 4, 2011 (76 FR 61402). NRC's Senior... ``Commission'') is announcing the availability of NUREG-1614, Volume 5, ``U.S. Nuclear Regulatory...

  9. South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-07-01

    The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

  10. Safety team assessments at NRC (Nuclear Regulatory Commission)-licensed fuel facilities

    SciTech Connect

    Sjoblom, G.L.

    1988-01-01

    Following the hydraulic rupture of a UF cylinder at the Sequoyah Fuels Facility on January 4, 1986, the US Nuclear Regulatory Commission's (NRC's) executive director for operations (EDO) established an augmented inspection team to investigate the accident. The investigation is reported in NUREG-1179. The EDO then formed a lessons-learned group to report on the action NRC might reasonably take to prevent similar accidents. The group's recommendations are reported in NUREG-1198. In addition, the EDO formed an independent materials safety regulation review study group (MSRRSG) to review the licensing and inspection program for NRC-licensed fuel cycle and materials facilities. During the same period of time that the MSRRSG report was being prepared and evaluated, the staff undertook an independent action to assess operational safety at each of the 12 major fuel facilities licensed by the NRC. The facilities included the 2 facilities producing uranium hexafluoride, the 7 facilities producing commercial nuclear reactor fuel, and the 3 facilities producing naval reactor fuel. The most important safety issues identified as needing attention by licensees were in the areas of fire protection, chemical hazards identification and mitigation, management controls or quality assurance, safety-related instrumentation and maintenance, and emergency preparedness.

  11. Nuclear Regulatory Commission issuances. Volume 47, Number 2

    SciTech Connect

    1998-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). They involve: 21st Century Technologies, Inc.; Hydro Resources, Inc.; Northeast Utilities; and Northern States Power Company.

  12. Nuclear Regulatory Commission issuances. Volume 46, Number 2

    SciTech Connect

    1997-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  13. Nuclear Regulatory Commission issuances. Volume 46, Number 1

    SciTech Connect

    1997-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  14. Nuclear Regulatory Commission issuances, Volume 45, No. 5

    SciTech Connect

    1997-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  15. Nuclear Regulatory Commission issuances, June 1997. Volume 45, Number 6

    SciTech Connect

    1997-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  16. Nuclear Regulatory Commission issuances: June 1995. Volume 41, Number 6

    SciTech Connect

    1995-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM). This report contains four issuances by the CLI, 5 issuances by the LBP, and 1 issuance by the DD.

  17. Regulatory Federalism: Policy, Process, Impact and Reform. A Commission Report.

    ERIC Educational Resources Information Center

    Advisory Commission on Intergovernmental Relations, Washington, DC.

    In the last two decades, the federal government's role in state and local affairs has shifted markedly from subsidy to regulation. This report examines the origins and effects of the new "regulatory federalism" and proposes reforms. Chapter 1 delineates the subject, chronicling the growth of intergovernmental regulation and discussing the legal…

  18. Indexes to Nuclear Regulatory Commission Issuances, January 1996--June 1996

    SciTech Connect

    1996-09-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Board Panel, The Administrative Law Judges, the Director`s Decisions, and the Decisions on Petitions for Rulemaking are presented in this document. The digests and indexes are intended to serve as a guide to the issuances. Information elements common the cases hear and ruled upon are displayed in one or more of five formats: case name index, headers and digests, legal citations index, subject index, and facility index.

  19. Nuclear Regulatory Commission Issuances. Volume 45, No. 3

    SciTech Connect

    1997-03-01

    This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  20. Nuclear Regulatory Commission issuances. Volume 44, Number 3

    SciTech Connect

    1996-09-01

    This report includes issuances received during September 1996. After reviewing in detail each of the claims made in this informal proceeding the presiding officer sustained the staff of the USNRC in its determination that the applicant did not pass the written portion of his examination to become a licensed operator of a nuclear power plant. In the proceeding concerning citizen group challenges to the decommissioning plan for the Rowe Yankee power station, the licensing board grants licensee Yankee Atomic Electric Company`s motion for summary disposition.

  1. Automatic adjustment clauses in public-utility rate schedules. A staff report on the implementation of Section 208 of the Public Utility Regulatory Policies Act of 1978

    SciTech Connect

    Not Available

    1982-02-01

    The Public Utility Regulatory Policies Act (PURPA), enacted November 8, 1978, directs the Federal Energy Regulatory Commission to make a comprehensive review of certain matters related to automatic adjustment clauses in electric rate schedules used by public utilities subject to the Commission's jurisdiction. The first requirement is that the Commission review automatic adjustment clauses in utility rate schedules to examine whether the clauses effectively provide incentives for efficient use of resources and also whether the clauses reflect only those costs that are either subject to periodic fluctuations or not susceptible to precise determinations in rate cases prior to the time the costs are incurred. The second requirement is that the Commission review the practices of each public utility under automatic adjustment clauses to insure efficient use of resources under such clauses. In response to these requirements, the Commission instituted a study and a staff investigation to examine the matters specifically identified in the Act. This report describes the progress that has been made in the study during the first two years since the passage of the Act related to the issues involved. The principal types of automatic adjustment clauses appearing in rate schedules subject to FERC jurisdiction are described and the extent of use of the types of clauses is indicated. The nature and results of the efforts made to analyze incentive effects, variability and predictability of certain costs, and the fuel procurement practices of utilities as related to automatic adjustment clauses are discussed. Preliminary staff conclusions from the review and analysis effort are presented.

  2. 77 FR 58375 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... information, contact Patrick Clarey, Office of Energy Market Regulation, Federal Energy Regulatory Commission... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State...

  3. Indexes to Nuclear Regulatory Commission Issuances, January--June 1997

    SciTech Connect

    1997-10-01

    This report indexes the issuances heard and ruled upon from January through June 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Information provided for each case includes the case name, full test reference, issuance number, issues raised by appellants, legal citations, facility name and docket number, subject matter of issues and/or rulings, type of hearing, and type of issuance. Each issuance is displayed in one or more of five separate formats: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index.

  4. Nuclear Regulatory Commission issuances, Volume 46, No. 4

    SciTech Connect

    1997-10-01

    This report includes the issuances received in October 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. Five issuances were received on the following subjects: (1) decontamination and decommissioning funding for Sequoyah Fuels Corporation and General Atomics; (2) involvement in NRC-licensed activities by Aharon Ben-Haim; (3) Barnett Industrial X-Ray, Inc.; (4) spent fuel storage installation at Northern States Power Company; and (5) Vermont Yankee Nuclear Power Station. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  5. Nuclear Regulatory Commission issuances, June 1996. Volume 43, Number 6

    SciTech Connect

    1996-06-01

    This report covers the issuances received during the specified period form the Commission, the Atomic Safety and licensing Boards, the administrative Law Judges, the Director`s decisions and the Decisions on Petitions for Rulemaking. Included are a memorandum and order on the decommissioning plan for Yankee Nuclear Power Station, a memorandum and order suspending byproduct material license for Eastern Testing and Inspection, Inc., an initial decision of the source materials license for Sequoyah Fuels Corporation, Director`s decisions for Palo Verde Nuclear Generating Station, Indian Point, Peach Bottom Atomic Power Station, Trojan Nuclear Plant, Rancho Seco Nuclear Generating Station, San Onofre Nuclear Generating Station, and Yankee Nuclear Power Station.

  6. Nuclear Regulatory Commission Issuances, Volume 44, No. 5

    SciTech Connect

    1996-11-01

    This report includes the issuances received in November 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. Seven issuances were received and are abstracted individually in the database: Emerick S. McDaniel, U.S. Enrichment Corporation, Sequoyah Fuels Corporation and General Atomics, all power reactor licensees, Florida Power and Light Company, Maine Yankee Atomic Power Company, and Northern States Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  7. Nuclear Regulatory Commission issuances, Volume 44, No. 4

    SciTech Connect

    1996-10-01

    This report includes the issuances received in October 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 15 issuances were received and are abstracted individually in the database: Louisiana Energy Services, U.S. Enrichment Corporation, Yankee Atomic Electric Company, General Public Utilities Nuclear Corporation, James L. Shelton, Juan Guzman, Northern States Power Company, TESTCO Inc., Washington Public Power Supply System, all nuclear plants, Cleveland Electric Illuminating Company, Duke Power Company, Florida Power Corporation, and Northeast Nuclear Energy Company (2 issuances). No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  8. 33 CFR Appendix B to Part 221 - Federal Energy Regulatory Commission Form L-3 (Revised October 1975)

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Commission Form L-3 (Revised October 1975) B Appendix B to Part 221 Navigation and Navigable Waters CORPS OF... 221—Federal Energy Regulatory Commission Form L-3 (Revised October 1975) terms and conditions of... set forth herein. Federal Energy Regulatory Commission Form L-4 (Revised October, 1975) terms...

  9. 78 FR 57668 - U.S. Nuclear Regulatory Commission Planned for Monitoring Activities for the Saltstone Disposal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    .... Department of Energy at the Savannah River Site Saltstone Disposal Facility in Accordance With the National... COMMISSION U.S. Nuclear Regulatory Commission Planned for Monitoring Activities for the Saltstone Disposal Facility at the Savannah River Site, Revision 1 AGENCY: Nuclear Regulatory Commission. ACTION: Notice...

  10. Nuclear Regulatory Commission Issuances, Volume 42, No. 2

    SciTech Connect

    1995-08-01

    This report include the issuances received during the specificed period (August 1995) from the NRC, the Atomic Safety and Licensing Boards, the Administrative Law Judges, and the Decisions on Petitions for Rule Making. In these issuances, the following areas were addressed: (1) Emergency planning at the University of Missouri, (2) Transfer of operating license at Plant Vogtle, (3) Discriminatory action against a whistle-blower at Millstone Units 1 & 2, (4) Regulatory issues related to embittlement and cracking at Oyster Creek, and (5) Age-related deterioration of reactor internals components at Pilgrim.

  11. 10 CFR Appendix A to Part 73 - U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses A Appendix A to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. A Appendix A to Part 73—U.S. Nuclear Regulatory...

  12. 10 CFR Appendix A to Part 73 - U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses A Appendix A to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. A Appendix A to Part 73—U.S. Nuclear Regulatory...

  13. 10 CFR Appendix A to Part 73 - U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses A Appendix A to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. A Appendix A to Part 73—U.S. Nuclear Regulatory...

  14. 10 CFR Appendix A to Part 5 - List of Federal Financial Assistance Administered by the Nuclear Regulatory Commission to Which...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Nuclear Regulatory Commission to Which Title IX Applies A Appendix A to Part 5 Energy NUCLEAR REGULATORY... the Nuclear Regulatory Commission to Which Title IX Applies Note: All recipients of Federal financial assistance from NRC are subject to Title IX, but Title IX's anti-discrimination prohibitions are limited...

  15. 10 CFR Appendix A to Part 5 - List of Federal Financial Assistance Administered by the Nuclear Regulatory Commission to Which...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Nuclear Regulatory Commission to Which Title IX Applies A Appendix A to Part 5 Energy NUCLEAR REGULATORY... the Nuclear Regulatory Commission to Which Title IX Applies Note: All recipients of Federal financial assistance from NRC are subject to Title IX, but Title IX's anti-discrimination prohibitions are limited...

  16. 10 CFR Appendix A to Part 73 - U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses A Appendix A to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. A Appendix A to Part 73—U.S. Nuclear Regulatory...

  17. 10 CFR Appendix A to Part 73 - U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses A Appendix A to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. A Appendix A to Part 73—U.S. Nuclear Regulatory...

  18. 39 CFR Appendix A to Part 3002 - Postal Regulatory Commission, Mission Statement of the Office of the Consumer Advocate

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Postal Regulatory Commission, Mission Statement of the Office of the Consumer Advocate A Appendix A to Part 3002 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION Pt. 3002, App. A Appendix A to Part 3002—Postal Regulatory...

  19. 39 CFR Appendix A to Part 3002 - Postal Regulatory Commission, Mission Statement of the Office of the Consumer Advocate

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Postal Regulatory Commission, Mission Statement of the Office of the Consumer Advocate A Appendix A to Part 3002 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION Pt. 3002, App. A Appendix A to Part 3002—Postal Regulatory...

  20. Indexes to Nuclear Regulatory Commission issuances, July-December 1997

    SciTech Connect

    1998-05-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (operating license, operating license amendment, etc); Type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats: Case Name Index, Headers and Digests, Legal Citations Index, Subject Index, and Facility Index.

  1. Nuclear Regulatory Commission Issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders: July 1, 1992--December 31, 1992, Volume 36, Pages 1--396

    SciTech Connect

    Not Available

    1992-12-31

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.

  2. Federal Energy Regulatory Commission financial statements, September 30, 1995 and 1994

    SciTech Connect

    1996-02-12

    The attached report presents the results of the independent certified public accountant`s audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1995 and 1994. The auditors have expressed an unqualified opinion on the 1995 statements. Their reports on FERC`s internal control structure and on compliance with laws and regulations, and management letter are also provided.

  3. The use of probabilistic risk assessment to satisfy the Nuclear Regulatory Commission`s maintenance rule

    SciTech Connect

    Dubord, R.M.

    1993-05-01

    Maintenance and inspection at nuclear power plants consumes a large portion of a utility`s resources, making resource allocation for such procedures vital. The NRC Maintenance Rule, due to be implemented in July of 1996, requires utilities to select systems, structures, and components (SSCS) important to safety and to develop a monitoring program to ensure that these SSCs are capable of fulfilling their intended functions. In light of these concerns, two ratios were developed to compare the risk significance of individual components with the amount of plant staff time, or burden, associated with inspecting the component. These risk/burden ratios point out existing disparities between current inspection practices and safety concerns. These ratios can be used to develop new inspection schedules constituting a more equitable risk to burden distribution.

  4. The regulatory quagmire underlying the TOPAZ II exhibition: The nuclear regulatory commission's jurisdiction over the TOPAZ II reactor system

    NASA Astrophysics Data System (ADS)

    Lawrence, John W.

    1992-01-01

    At the 8th Symposium on Space Nuclear Power Systems, 6-10 January 1990, the Union of Soviet Socialist Republics displayed a TOPAZ II thermionic space nuclear reactor. Underlying that exhibition was a regulatory quagmire created by a decision of the Nuclear Regulatory Commission that an import license was required to bring the device into the United States, and that an amendment to their regulations governing exports was required to return the device to the Soviet Union latter that summer. This paper briefly reviews the jurisdictional issue of how the Nuclear Regulatory Commission exerted its authority over the TOPAZ II reactor system, as well as the manner in which the import and export licensing actions were accomplished. In sum, the paper offers an independent interpretation of the applicable import and export regulations, and concludes that the Nuclear Regulatory Commission likely need not have exercised its import jurisdiction, and notwithstanding the initial assumption of jurisdiction, an export license likely could have been issued without an amendment to the then existing regulations.

  5. 77 FR 16828 - Constellation Energy Commodities Group, Inc.; Notice of Designation of Certain Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Constellation Energy Commodities Group, Inc.; Notice of Designation of Certain Commission Personnel as Non-Decisional Commission staff members Sandra Waldstein and...

  6. 78 FR 34093 - California Independent System Operator Corporation; Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission California Independent System Operator Corporation; Notice of FERC Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that on the following date members of its staff...

  7. 10 CFR 1040.124 - Responsibility of the Federal Energy Regulatory Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... be placed in title 18 CFR. Judicial Review ... 10 Energy 4 2014-01-01 2014-01-01 false Responsibility of the Federal Energy Regulatory Commission. 1040.124 Section 1040.124 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION...

  8. 10 CFR 1040.124 - Responsibility of the Federal Energy Regulatory Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... be placed in title 18 CFR. Judicial Review ... 10 Energy 4 2010-01-01 2010-01-01 false Responsibility of the Federal Energy Regulatory Commission. 1040.124 Section 1040.124 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION...

  9. 10 CFR 1040.124 - Responsibility of the Federal Energy Regulatory Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... be placed in title 18 CFR. Judicial Review ... 10 Energy 4 2013-01-01 2013-01-01 false Responsibility of the Federal Energy Regulatory Commission. 1040.124 Section 1040.124 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION...

  10. 10 CFR 1040.124 - Responsibility of the Federal Energy Regulatory Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... be placed in title 18 CFR. Judicial Review ... 10 Energy 4 2011-01-01 2011-01-01 false Responsibility of the Federal Energy Regulatory Commission. 1040.124 Section 1040.124 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION...

  11. 39 CFR Appendix A to Part 3002 - Postal Regulatory Commission, Mission Statement of the Office of the Consumer Advocate

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the Office of the Consumer Advocate A Appendix A to Part 3002 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION Pt. 3002, App. A Appendix A to Part 3002—Postal Regulatory Commission... Advocate is to be a vigorous, responsive, and effective advocate for reasonable and equitable treatment...

  12. 10 CFR Appendix A to Part 5 - List of Federal Financial Assistance Administered by the Nuclear Regulatory Commission to Which...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false List of Federal Financial Assistance Administered by the Nuclear Regulatory Commission to Which Title IX Applies A Appendix A to Part 5 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Pt. 5, App. A...

  13. 10 CFR Appendix A to Part 5 - List of Federal Financial Assistance Administered by the Nuclear Regulatory Commission to Which...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false List of Federal Financial Assistance Administered by the Nuclear Regulatory Commission to Which Title IX Applies A Appendix A to Part 5 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Pt. 5, App. A...

  14. 76 FR 31997 - Final Memorandum of Understanding Between the U.S. Nuclear Regulatory Commission and the U.S...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Final Memorandum of Understanding Between the U.S. Nuclear Regulatory Commission and the U.S. Department of Homeland Security on Chemical Facility Anti-Terrorism Standards AGENCY: Nuclear...

  15. 10 CFR Appendix A to Part 5 - List of Federal Financial Assistance Administered by the Nuclear Regulatory Commission to Which...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false List of Federal Financial Assistance Administered by the Nuclear Regulatory Commission to Which Title IX Applies A Appendix A to Part 5 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Pt. 5, App. A...

  16. Response to Nuclear Regulatory Commission`s ten questions pertaining to site-specific models for use in the license termination rule: Multimedia Environmental Pollutant Assessment System (MEPAS)

    SciTech Connect

    Buck, J.W.; Whelan, G.; Strenge, D.L.; Hoopes, B.L.; McDonald, J.P.; Castleton, K.J.; Pelton, M.A.; Gelston, G.M.; Taira, R.Y.

    1998-05-01

    This paper is in response to the US Nuclear Regulatory Commission (NRC) ten questions posed at the Modeling Workshop held November 13 and 14, 1997. The ten questions were developed in advance of the workshop to allow model developers to prepare a presentation at the Workshop. This paper is an expanded version of the Multimedia Environmental Pollutant Assessment System (MEPAS) presentation given at the Modeling Workshop by Pacific Northwest National Laboratory (PNNL) staff. This paper is organized by the ten questions asked by the NRC, each section devoted to a single question. The current version of methodology is MEPAS 3.2 (NRC 1997) and the discussion in this paper will pertain to that version. In some cases, MEPAS 4.0, which is currently being developed under the Framework for Risk Analysis in Multimedia Environmental Systems (FRAMES) (Whelan et al. 1997), will be referenced to inform the reader of potential capabilities in the near future. A separate paper is included in the document that discusses the FRAMES concept.

  17. The safety goals of the U.S. Nuclear Regulatory Commission.

    PubMed

    Okrent, D

    1987-04-17

    In August 1986, after 6 years of effort, the U.S. Nuclear Regulatory Commission adopted a Policy Statement on safety goals for nuclear power reactors. The commission's qualitative goals state that individual members of the public should be provided a level of protection from the consequences of nuclear power plant operation such that they bear no significant additional risk to life and health, and societal risks to life and health from nuclear power should be comparable to or less than the risks of generating electricity by viable competing technologies and should not be a significant addition to other societal risks. The commission's safety goal Policy Statement also includes quantitative design objectives. PMID:3563510

  18. 78 FR 65640 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission...

  19. 78 FR 48156 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission...

  20. 78 FR 7773 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission...

  1. The Trading Post System on the Navajo Reservation. Staff Report to the Federal Trade Commission.

    ERIC Educational Resources Information Center

    Federal Trade Commission, Los Angeles, CA.

    Since the late 19th century, trading posts have been a prominant feature in Navajo economic life. Today, due to geographic isolation and an absence of economic alternatives, many Navajos are still dependent upon trading posts. This report of a Federal Trade Commission (FTC) investigation details the system on the Navajo Reservation, including the…

  2. 78 FR 16133 - Availability of E-Tag Information to Commission Staff

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... No. 771, 77 FR 76367 (Dec. 28, 2012), FERC Stats & Regs ] 31,339 (2012). ] I. Overview 2. In this... the validation requirements of Order No. 771; validation of e-Tags means that the Sink Balancing... 14 1. Validation of the Commission on E-Tags 14 2. Prospective Effect of Order No. 771 22...

  3. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258

    SciTech Connect

    1996-11-01

    This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition.

  4. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Carl Wharton; Kent Norris

    2009-12-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  5. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Carl Wharton; Kent Norris

    2010-03-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  6. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Carl Wharton

    2009-10-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  7. 76 FR 60557 - Closure of the U.S. Nuclear Regulatory Commission's Two White Flint North Building Entrance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... COMMISSION Closure of the U.S. Nuclear Regulatory Commission's Two White Flint North Building Entrance AGENCY...) building entrance lobby. Only NRC badged employees and contractors shall be permitted to use the Two White..., Rockville, MD 20852-2738. Two White Flint North is located at 11545 Rockville Pike, Rockville, MD...

  8. 78 FR 13712 - U.S. Nuclear Regulatory Commission Planned Monitoring Activities for F-Area Tank Farm at the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... COMMISSION U.S. Nuclear Regulatory Commission Planned Monitoring Activities for F-Area Tank Farm at the... Savannah River Site F-Area Tank Farm Facility in Accordance with the National Defense Authorization Act for... DOE's waste disposal activities at the F-Area Tank Farm at the Savannah River Site, in accordance...

  9. Report on the establishment and operation of the Federal Energy Regulatory Commission's Daycare Center

    SciTech Connect

    Not Available

    1991-09-16

    We have completed an inspection of the Federal Energy Regulatory Commission's (FERC) Daycare Center (Center). The purpose of the inspection was to review for efficiency, economy and compliance with laws and regulations, FERC's establishment and operation of the Center. The inspection objectives were to review: (1) FERC's compliance with Federal laws and requirements of the General Services Administration and the District of Columbia; (2) the source and amount of funds for establishing and operating the Center; and (3) the organizational relationships between FERC, the Center and the contractor operating the Center.

  10. Improved cost-benefit techniques in the US Nuclear Regulatory Commission

    SciTech Connect

    Cronin, F.J.; Nesse, R.J.; Vaeth, M.; Wusterbarth, A.R.; Currie, J.W.

    1983-06-01

    The major objective of this report is to help the US Nuclear Regulatory Commission (NRC) in its regulatory mission, particularly with respect to improving the use of cost-benefit analysis and the economic evaluation of resources within the NRC. The objectives of this effort are: (1) to identify current and future NRC requirements (e.g., licensing) for valuing nonmarket goods; (2) to identify, highlight, and present the relevant efforts of selected federal agencies, some with over two decades of experience in valuing nonmarket goods, in this area; and (3) to review methods for valuing nonmarket impacts and to provide estimats of their magnitudes. Recently proposed legislation may result in a requirement for not only more sophisticated valuation analyses, but more extensive applications of these techniques to issues of concern to the NRC. This paper is intended to provide the NRC with information to more efficiently meet such requirements.

  11. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... 52, in the Federal Register on January 11, 2012 (77 FR 1749). The period for submitting comments on... COMMISSION Interim Staff Guidance on Changes During Construction AGENCY: Nuclear Regulatory Commission... Guidance (ISG) COL-ISG-025 ``Interim Staff Guidance on Changes During Construction.'' This ISG...

  12. 77 FR 69450 - Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-19

    ... Energy Regulatory Commission Notice of FERC Staff Attendance Docket No. PacifiCorp ER13-64-000 Deseret... staff will attend a meeting conducted by representatives of WestConnect, ColumbiaGrid, Northern Tier..., may be found at www.nttg.biz . The meeting is open to all stakeholders and Commission...

  13. 76 FR 19355 - Notice of Staff Attendance at Southwest Power Pool Markets Operations Policy Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... more information, contact Patrick Clarey, Office of Energy Market Regulation, Federal Energy Regulatory... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Staff Attendance at Southwest Power Pool Markets Operations...

  14. Description of Multimedia Environment Pollutant Assessment System (MEPAS) version 3.2 modification for the Nuclear Regulatory Commission

    SciTech Connect

    Buck, J.W.; Strenge, D.L.; Hoopes, B.L.

    1997-11-01

    The Multimedia Environmental Pollutant Assessment System (MEPAS) is a software tool developed by Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE) to allow DOE to conduct human health risk analyses nation-wide. This report describes modifications to the MEPAS to meet the requirements of the U.S. Nuclear Regulatory Commission (NRC) staff in their analyses of Site Decommissioning Management Plan sites. In general, these modifications provide the MEPAS, Version 3.2, with the capability of calculating and reporting annual dose/risk information. Modifications were made to the exposure pathway and health impact modules and the water and atmospheric transport modules. Several example cases used to test the MEPAS, Version 3.2, are also presented. The MEPAS, Version 3.2, also contains a new source-term release component that includes models for estimating contaminant loss from three different types of source zones (contaminated aquifer, contaminated pond/surface impoundment, and contaminated vadose zone) due to decay/degradation, leaching, wind suspension, water erosion, overland flow, and/or volatilization. When multiple loss routes are assumed to occur simultaneously, the models account for their interaction and calculate an appropriate pollutant mass budget to each loss route over time.

  15. 76 FR 63676 - Final Division of Safety Systems Interim Staff Guidance DSS-ISG-2010-01: Staff Guidance Regarding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-13

    ... COMMISSION Final Division of Safety Systems Interim Staff Guidance DSS-ISG- 2010-01: Staff Guidance Regarding the Nuclear Criticality Safety Analysis for Spent Fuel Pools AGENCY: Nuclear Regulatory Commission... Regarding the Nuclear Criticality Safety Analysis for Spent Fuel Pools.'' This DSS-ISG provides...

  16. 33 CFR Appendix B to Part 221 - Federal Energy Regulatory Commission Form L-3 (Revised October 1975)

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Federal Energy Regulatory Commission Form L-3 (Revised October 1975) B Appendix B to Part 221 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Pt. 221, App. B Appendix B to Part 221—Federal Energy Regulatory...

  17. 33 CFR Appendix B to Part 221 - Federal Energy Regulatory Commission Form L-3 (Revised October 1975)

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Federal Energy Regulatory Commission Form L-3 (Revised October 1975) B Appendix B to Part 221 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Pt. 221, App. B Appendix B to Part 221—Federal Energy Regulatory...

  18. Organizational behavior of regulatory agencies: a case study of the Bureau of Consumer Services in the Pennsylvania Public Utility Commission

    SciTech Connect

    Silver, J.H.

    1981-01-01

    Regulatory agencies operate in a complex field of organizations and interest groups. The variety of behaviors that occur in the regulatory field are not satisfactorily explained by current interpretative frameworks. Regulatory agencies are at once criticized and praised. They flourish as organizational entities, yet they exhibit behavior that is often inexplicable. Notions like clientele capture, the politics of regulation, exchange theory, and institutionalized organizations do not singly explain the vagaries of regulatory behavior. A merger of these viewpoints, however, provides a foundation for a comprehensive interpretative framework. A bureau of consumer services within a state public utility commission is viewed as an institutionalized organization. From this perspective, a variety of ritual behaviors, based upon symbolic and tangible interorganizational exchanges are observed and characterized. The outcome of these exchanges is the establishment of the Bureau of Consumer Services as a legitimate regulatory agent with significant impact upon the formulation of regulatory policy in the formal proceedings of the Pennsylvania Public Utility Commission.

  19. 77 FR 63811 - Notice of Commissioners and Staff Attendance at FERC Author Speaker Series Event

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... Energy Regulatory Commission Notice of Commissioners and Staff Attendance at FERC Author Speaker Series... the Commission and/or Commission staff may attend the following event: Author Speaker Series featuring... event will feature Pulitzer Prize winning author, Daniel Yergin, presenting on his most recent book,...

  20. Special committee review of the Nuclear Regulatory Commission's severe accident risks report (NUREG--1150)

    SciTech Connect

    Kouts, H.J.C. ); Apostolakis, G.; Kastenberg, W.E. ); Birkhofer, E.H.A. , Koeln ); Hoegberg, L.G. ); LeSage, L.G. ); Rasmussen, N.C. (Massachusetts Inst. of Tech., Camb

    1990-08-01

    In April 1989, the Nuclear Regulatory Commission's (NRC) Office of Nuclear Regulatory Research (RES) published a draft report Severe Accident Risks: An Assessment for Five US Nuclear Power Plants,'' NUREG-1150. This report updated, extended and improved upon the information presented in the 1974 Reactor Safety Study,'' WASH-1400. Because the information in NUREG-1150 will play a significant role in implementing the NRC's Severe Accident Policy, its quality and credibility are of critical importance. Accordingly, the Commission requested that the RES conduct a peer review of NUREG-1150 to ensure that the methods, safety insights and conclusions presented are appropriate and adequately reflect the current state of knowledge with respect to reactor safety. To this end, RES formed a special committee in June of 1989 under the provisions of the Federal Advisory Committee Act. The Committee, composed of a group of recognized national and international experts in nuclear reactor safety, was charged with preparing a report reflecting their review of NUREG-1150 with respect to the adequacy of the methods, data, analysis and conclusions it set forth. The report which precedes reflects the results of this peer review.

  1. Commissioning

    SciTech Connect

    Huta, L.G.

    1995-12-01

    Building managers often find that HVAC, lighting and other systems in new buildings need adjustments and modifications. The owner, architect and contractor may mistakenly assume that all of a building`s systems--architectural, mechanical, control and electrical--function according to the design intent. Thus, energy managers can optimize their building`s performance through commissioning, a process that looks for and corrects the defects in a building` operating system or design, immediately before and after it is occupied (following construction or renovation).

  2. Nuclear Regulatory Commission activities to prepare for reviewing license applications and issuing licenses

    SciTech Connect

    Uleck, R.B.; DeFino, C.V.

    1991-12-31

    The Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA) assigned States the responsibility to provide for disposal of commercial low-level radioactive waste (LLRW) by 1993. The LLRWPAA also required the US Nuclear Regulatory Commission (NRC) to establish procedures and develop the technical review capability to process license applications for new LLRW disposal facilities. Under the LLRWPAA, NRC is required, to the extent practicable, to complete its review of an LLRW disposal facility license application within 15 months of its submittal by a State. This provision of the LLRWPAA helps ensure that NRC, in addition to protecting public health and safety and the environment, facilitates States` achievement of LLRWPAA milestones for new facility development. A timely NRC review is needed for States to accomplish their objective of having new disposal facilities in operation on the dates prescribed in the LLRWPAA. To help assure NRC and States` compliance with the provisions of the LLRWPAA, NRC has developed a licensing review strategy that includes: (1) the further development of regulatory guidance, (2) enhancement of licensing review capability, and (3) prelicensing regulatory consultation with potential applicants.

  3. 75 FR 41858 - Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee Meeting July 12, 2010. The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend...

  4. Report to the US Nuclear Regulatory Commission on Analysis and Evaluation of Operational Data, 1986

    SciTech Connect

    1987-05-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during calendar year 1986. Comments and observations are provided on operating experience at nuclear power plants and other NRC licensees, including results from selected AEOD studies; summaries of abnormal occurrences involving US nuclear plants; reviews of licensee event reports and their quality, reactor scram experience from 1984 to 1986, engineered safety features actuations, and the trends and patterns analysis program; and assessments of nonreactor and medical misadministration events. In addition, the report provides the year-end status of all recommendations included in AEOD studies, and listings of all AEOD reports issued from 1980 through 1986.

  5. Training related research and development conducted at Oak Ridge National Laboratory for the US Nuclear Regulatory Commission

    SciTech Connect

    Haas, P.M.

    1985-01-01

    For a number of years Oak Ridge National Laboratory (ORNL) has conducted a sizeable program of human factors research and development in support of the Office of Nuclear Regulatory Research of the US Nuclear Regulatory Commission (NRC). The history of this effort has in many ways paralleled the growth of human factors R and D throughout the nuclear industry and the program has contributed to advances in the industry as well as to NRC regulatory and research programs. This paper reviews the major projects and products of the program relevant to training and concludes with an identification of future R and D needs.

  6. Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Kent Norris

    2009-11-01

    This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  7. The Cold War legacy of regulatory risk analysis: The Atomic Energy Commission and radiation safety

    NASA Astrophysics Data System (ADS)

    Boland, Joseph B.

    From its inception in 1946 the Atomic Energy Commission pioneered the use of risk analysis as a mode of regulatory rationality and political rhetoric, yet historical treatments of risk analysis nearly always overlook the important role it played in the administration of atomic energy during the early Cold War. How this absence from history has been achieved and why it characterizes most historical accounts are the subjects of Chapter II. From there, this study goes on to develop the thesis that the advent of the atomic bomb was a world-shattering event that forced the Truman administration to choose between two novel alternatives: (1) movement towards global governance based initially on cooperative control of atomic energy or (2) unsparing pursuit of nuclear superiority. I refer to these as nuclear internationalism and nuclear nationalism, respectively. Each defined a social risk hierarchy. With the triumph of nuclear nationalism, nuclear annihilation was designated the greatest risk and a strong nuclear defense the primary means of prevention. The AEC's mission in the 1950s consisted of the rapid development of a nuclear arsenal, continual improvements in weapons technologies, and the promotion of nuclear power. The agency developed a risk-based regulatory framework through its dominant position within the National Committee on Radiation Protection. It embraced a technocratic model of risk analysis whose articulation and application it controlled, largely in secret. It used this to undergird a public rhetoric of reassurance and risk minimization. In practice, safety officials adjusted exposure levels within often wide parameters and with considerable fluidity in order to prevent safety concerns from interfering with operations. Secrecy, the political climate of the time, and a lack of accountability enabled the agency to meld technical assessments with social value judgments in a manner reflective of nuclear nationalism's risk hierarchy. In the late fifties

  8. 76 FR 13613 - Notice of FERC Staff Attendance at the ICT Stakeholders Policy Committee and Entergy Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the ICT Stakeholders Policy Committee and Entergy Regional State Committee Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of its...

  9. NRC (Nuclear Regulatory Commission) perspective of software QA (quality assurance) in the nuclear history

    SciTech Connect

    Weiss, S.H.

    1988-01-01

    Computer technology has been a part of the nuclear industry since its inception. However, it is only recently that computers have been integrated into reactor operations. During the early history of commercial nuclear power in the United States, the US Nuclear Regulatory Commission (NRC) discouraged the use of digital computers for real-time control and monitoring of nuclear power plant operation. At the time, this position was justified since software engineering was in its infancy, and horror stories on computer crashes were plentiful. Since the advent of microprocessors and inexpensive computer memories, significant advances have been made in fault-tolerant computer architecture that have resulted in highly reliable, durable computer systems. The NRC's requirement for safety parameter display system (SPDS) stemmed form the results of studies and investigations conducted on the Three Mile Island Unit 2 (TMI-2) accident. An NRC contractor has prepared a handbook of software QA techniques applicable to the nuclear industry, published as NUREG/CR-4640 in August 1987. Currently, the NRC is considering development of an inspection program covering software QA. Future efforts may address verification and validation as applied to expert systems and artificial intelligence programs.

  10. 76 FR 15305 - Moussa I. Kourouma d/b/a Quntum Energy LLC; Notice of Designation of Commission Staff as Non...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Moussa I. Kourouma d/b/a Quntum Energy LLC; Notice of Designation of.... Dated: March 14, 2011. Kimberly D. Bose, Secretary. BILLING CODE 6717-01-P...

  11. 76 FR 54766 - Notice of FERC Staff Attendance at a Hearing Before the Arkansas Public Service Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... Arkansas, Inc. (EAI) in Docket No. 10-011-U beginning at 8:30 a.m. on September 7, 2011. The hearing...-66 Louisiana Public Service Commission v. Entergy Services, Inc. Docket No. EL01-88 Louisiana Public Service Commission v. Entergy Services, Inc. Docket No. EL07-52 Louisiana Public Service Commission...

  12. 77 FR 64505 - Notice of Staff Attendance at Southwest Power Pool Regional Entity Trustee, Regional State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... Energy Regulatory Commission Notice of Staff Attendance at Southwest Power Pool Regional Entity Trustee... (Commission) hereby gives notice that members of its staff may attend the meetings of the Southwest Power Pool... held at the SPP Corporate Offices, 201 Worthen Drive, Little Rock, AR 722111. The phone number is...

  13. 78 FR 6320 - Notice of Staff Attendance at Southwest Power Pool Regional Entity Trustee, Regional State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... Energy Regulatory Commission Notice of Staff Attendance at Southwest Power Pool Regional Entity Trustee... (Commission) hereby gives notice that members of its staff may attend the meetings of the Southwest Power Pool... held at the SPP Corporate Offices, 201 Worthen Drive, Little Rock, AR 722111. The phone number is...

  14. 78 FR 64495 - Notice of Staff Attendance at Southwest Power Pool Regional Entity Trustee, Regional State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... Energy Regulatory Commission Notice of Staff Attendance at Southwest Power Pool Regional Entity Trustee... (Commission) hereby gives notice that members of its staff may attend the meetings of the Southwest Power Pool... held at the SPP Corporate Offices, 201 Worthen Drive, Little Rock, AR 722111. The phone number is...

  15. 76 FR 71966 - Notice of Commissioner and Staff Attendance at ReliabilityFirst

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... Energy Regulatory Commission Notice of Commissioner and Staff Attendance at ReliabilityFirst Corporation... Commission staff may attend the following meetings: ReliabilityFirst Corporation, Annual Meeting of Members... Corporation For further information, please contact Jonathan First, (202) 502- 8529, or...

  16. Regulatory and technical reports (abstract index journal): Annual compilation for 1996, Volume 21, No. 4

    SciTech Connect

    Sheehan, M.A.

    1997-04-01

    This compilation is the annual cumulation of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors.

  17. Commission Staff Working Document: Lifelong Learning Practice and Indicators. Supporting Document to the Communication from the Commission Making a European Area of Lifelong Learning a Reality.

    ERIC Educational Resources Information Center

    Commission of the European Communities, Brussels (Belgium). Directorate-General for Education and Culture.

    This document provides information relevant to the commission's communication on "Making a European Area of Lifelong Learning a Reality." Section 2 presents a selection of illustrative examples of lifelong learning in practice throughout Europe, grouped under these same priority areas used in the communication itself: valuing learning;…

  18. Staff Report to the Senior Department Official on Recognition Compliance Issues. Recommendation Page: Commission on Massage Therapy Accreditation

    ERIC Educational Resources Information Center

    US Department of Education, 2010

    2010-01-01

    The Commission on Massage Therapy Accreditation (COMTA) was created in response to massage therapy and bodywork educators' desire that rigorous standards be applied to institutions of massage therapy and bodywork. COMTA has conducted accrediting activities since 1992. In 1996, an elected commission was seated. Since 1996, COMTA has granted…

  19. Staff Report to the Senior Department Official on Recognition Compliance Issues. Recommendation Page: Commission on Accreditation of Healthcare Management Education

    ERIC Educational Resources Information Center

    US Department of Education, 2010

    2010-01-01

    The agency currently known as the Commission on Accreditation of Healthcare Management Education (CAHME) was originally founded in 1968 by several professional health-related organizations. The agency was originally known as the Accrediting Commission on Graduate Education for Hospital Administration (ACGEHA). To better reflect the broad range of…

  20. 78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... COMMISSION Draft Spent Fuel Storage and Transportation Interim Staff Guidance AGENCY: Nuclear Regulatory... Regulatory Commission (NRC) requests public comment on Draft Spent Fuel Storage and Transportation Interim... Integrity for Continued Storage of High Burnup Fuel Beyond 20 Years.'' The draft SFST-ISG provides...

  1. 78 FR 11868 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-20

    ... Energy Market Regulation, Federal Energy Regulatory Commission at (317) 249- 5937 or patrick.clarey@ferc... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State...

  2. 77 FR 50683 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ..., contact Peter Nagler, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State...

  3. 76 FR 28024 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ..., contact Patrick Clarey, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (317... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State...

  4. 77 FR 33212 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... Clarey, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (317) 249- 5937 or... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State...

  5. 78 FR 72673 - Zero Rate Reactive Power Rate Schedules; Notice of Staff Workshop

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Zero Rate Reactive Power Rate Schedules; Notice of Staff Workshop This.... to 4 p.m. at the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC...

  6. 78 FR 75562 - Zero Rate Reactive Power Rate Schedules; Notice of Staff Workshop

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Zero Rate Reactive Power Rate Schedules; Notice of Staff Workshop This... on December 11, 2013 from 1:30 p.m. to 4 p.m. at the Federal Energy Regulatory Commission, 888...

  7. 76 FR 5799 - Notice of Commissioners and Staff Attendance at FERC Leadership Development Program Induction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-02

    ... Energy Regulatory Commission Notice of Commissioners and Staff Attendance at FERC Leadership Development...: FERC Leadership Development Program Induction Ceremony: 888 First Street, NE., Washington, DC 20426... Leadership Development Program. Kimberly D. Bose, Secretary. BILLING CODE 6717-01-P...

  8. 17 CFR 201.421 - Commission consideration of determinations by self-regulatory organizations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Commission pursuant to Section 19(d)(1) of the Exchange Act, 15 U.S.C. 78s(d)(1). (b) Supplemental briefing... supplemental briefing with respect to issues not briefed by the parties shall be given where the Commission believes that such briefing would significantly aid the decisional process....

  9. 76 FR 81547 - Office of New Reactors; Notice of Availability of the Final Staff Guidance; Section 13.5.1.1...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ... COMMISSION Office of New Reactors; Notice of Availability of the Final Staff Guidance; Section 13.5.1.1, Revision 1 on Administrative Procedures-- General AGENCY: Nuclear Regulatory Commission. ACTION: Notice of availability. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing its final Revision 1 to...

  10. 77 FR 71019 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-04; Guidance on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-28

    ... for public comment. On September 10, 2012 (77 FR 55510), the NRC requested public comments on draft... COMMISSION Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-04; Guidance on...: Nuclear Regulatory Commission. ACTION: Japan Lessons-Learned Project Directorate Interim Staff...

  11. Equalization Trends in Minnesota Education Finance, 1972 through 1987. A Staff Report to the Minnesota Legislative Commission on Public Education.

    ERIC Educational Resources Information Center

    Sutter, Joel A.; Hopeman, Alan R., Jr.

    This report is a study of the degree of equalization of school district revenues and tax rates in Minnesota, with emphasis on changes that have occurred over recent years. The report was prepared by the research staff of the Minnesota Senate and House of Representatives. The study places emphasis on the role of school district property wealth in…

  12. Nuclear Regulatory Commission Issuances. Volume 42, No. 1, Pages 1--45

    SciTech Connect

    1995-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  13. A review of the regulatory and functional aspects of prison health care and nursing staff.

    PubMed

    Arribas-López, E

    2015-01-01

    The aim of this study of prison health care staff in Prison Health Care and Nursing Units is twofold. The first one is to consider those aspects of the legal system applicable to them as government employees of the General State Administration at the service of Prisons, highlighting the peculiarities of the legal regulations that can be applied as a result of providing said service. The second, based on the general regulations on prison health contained in Organic Law 1/1979, of 26 September, General Penitentiary Law and the implementing regulations thereof, approved by Royal Decree 190/1966, of 9 February, sets out to provide a critical analysis of the obligatory and functional framework for health care and nursing staff established in the old Penitentiary Regulations of 1981, to determine from a legal perspective if it is possible to impede or brake so that the Prison Administration may develop or carry out the functions for which it is responsible in terms of planning, organization and management of activities geared towards maintaining and improving hygiene and health in the prison environment. PMID:26501590

  14. Staff Report to the Senior Department Official on Recognition Compliance Issues. Recommendation Page: Northwest Commission on Colleges and Universities

    ERIC Educational Resources Information Center

    US Department of Education, 2010

    2010-01-01

    The Northwest Commission on Colleges and Universities (NWCCU) currently accredits approximately 160 degree-granting institutions located in the Northwest region, which consists of the states of Alaska, Idaho, Montana, Nevada, Oregon, Utah, and Washington. The agency's recognition enables the institutions it accredits to seek eligibility to…

  15. 78 FR 17604 - 2006 Biennial Regulatory Review-Revision of the Commission's Rules

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... the requirements. DATES: The amendments to 47 CFR 25.110 and 25.137, published at 78 FR 8417, February... 78 FR 8417, February 6, 2013. The OMB Control Number is 3060-0678. The Commission publishes this... and Order will facilitate preparation of earth and space station applications, promote compliance...

  16. 76 FR 76712 - Notice of Staff Attendance at Southwest Power Pool Markets and Operations Policy Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ... Energy Market Regulation, Federal Energy Regulatory Commission at (317) 249- 5937 or patrick.clarey@ferc... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Staff Attendance at Southwest Power Pool Markets and...

  17. 77 FR 58829 - Notice of FERC Staff Attendance at Entergy/Cleco Teleconference on Order No. 1000

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ..., Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502-6083 or peter... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at Entergy/Cleco Teleconference on Order...

  18. 75 FR 63469 - Notice of Staff Attendance at Southwest Power Pool Regional State Committee Meeting and Southwest...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ..., contact Patrick Clarey, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (317... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Staff Attendance at Southwest Power Pool Regional State...

  19. 75 FR 63168 - Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee Meeting and the Entergy Regional State Committee Meeting October 6, 2010. The Federal Energy Regulatory Commission...

  20. 75 FR 23262 - Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee Meeting and the Entergy Regional State Committee Meeting April 26, 2010. The Federal Energy Regulatory Commission hereby...

  1. 76 FR 67727 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Work Group and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State Committee Work Group and Stakeholder Meeting The Federal Energy Regulatory Commission hereby gives notice that...

  2. 75 FR 42747 - Smart Grid Update; Notice of Commissioner and Staff Attendance at FERC/NARUC Collaborative on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Energy Regulatory Commission Smart Grid Update; Notice of Commissioner and Staff Attendance at FERC/NARUC Collaborative on Smart Response Meeting July 15, 2010. The Federal Energy Regulatory Commission hereby gives.../NARUC Collaborative on Smart Response: Sacramento Convention Center, 1400 J Street, Sacramento, CA...

  3. The use of information systems to transform utilities and regulatory commissions: The application of geographic information systems

    SciTech Connect

    Wirick, D.W.; Montgomery, G.E.; Wagman, D.C.; Spiers, J.

    1995-09-01

    One technology that can assist utilities remain financially viable in competitive markets and help utilities and regulators to better serve the public is information technology. Because geography is an important part of an electric, natural gas, telecommunications, or water utility, computer-based Geographic Information Systems (GIS) and related Automated Mapping/Facilities Management systems are emerging as core technologies for managing an ever-expanding variety of formerly manual or paper-based tasks. This report focuses on GIS as an example of the types of information systems that can be used by utilities and regulatory commissions. Chapter 2 provides general information about information systems and effects of information on organizations; Chapter 3 explores the conversion of an organization to an information-based one; Chapters 4 and 5 set out GIS as an example of the use of information technologies to transform the operations of utilities and commissions; Chapter 6 describes the use of GIS and other information systems for organizational reengineering efforts; and Chapter 7 examines the regulatory treatment of information systems.

  4. 41 CFR 101-42.1102-4 - Nuclear Regulatory Commission-controlled materials.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... regulations of the NRC (see 10 CFR parts 30 through 35, 40, and 70). (c) Information and inquiries. All... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Nuclear Regulatory...-Special Types of Hazardous Materials and Certain Categories of Property § 101-42.1102-4 Nuclear...

  5. 41 CFR 101-42.1102-4 - Nuclear Regulatory Commission-controlled materials.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... regulations of the NRC (see 10 CFR parts 30 through 35, 40, and 70). (c) Information and inquiries. All... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Nuclear Regulatory...-Special Types of Hazardous Materials and Certain Categories of Property § 101-42.1102-4 Nuclear...

  6. 41 CFR 101-42.1102-4 - Nuclear Regulatory Commission-controlled materials.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... regulations of the NRC (see 10 CFR parts 30 through 35, 40, and 70). (c) Information and inquiries. All... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Nuclear Regulatory...-Special Types of Hazardous Materials and Certain Categories of Property § 101-42.1102-4 Nuclear...

  7. 41 CFR 101-42.1102-4 - Nuclear Regulatory Commission-controlled materials.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... regulations of the NRC (see 10 CFR parts 30 through 35, 40, and 70). (c) Information and inquiries. All... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Nuclear Regulatory...-Special Types of Hazardous Materials and Certain Categories of Property § 101-42.1102-4 Nuclear...

  8. 41 CFR 101-42.1102-4 - Nuclear Regulatory Commission-controlled materials.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... regulations of the NRC (see 10 CFR parts 30 through 35, 40, and 70). (c) Information and inquiries. All... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Nuclear Regulatory...-Special Types of Hazardous Materials and Certain Categories of Property § 101-42.1102-4 Nuclear...

  9. Indexes to Nuclear Regulatory Commission Issuances, July--December 1993. Volume 38, Index 2

    SciTech Connect

    Not Available

    1994-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Digests and Headers; Legal Citations Index; Subject Index, and Facility Index.

  10. Indexes to Nuclear Regulatory Commission issuances, January--June 1995. Volume 41, Index 2

    SciTech Connect

    1995-09-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the directors` Decisions (DD), and the Denials of Petitions for rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. The information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index; and facility index.

  11. 76 FR 1335 - Supplemental Standards of Ethical Conduct for Employees of the Federal Energy Regulatory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ...; 5 U.S.C. App. (Ethics in Government Act of 1978); 42 U.S.C. 7171, 7172; E.O. 12674, 54 FR 15159, 3 CFR, 1989 Comp., p. 215, as modified by E.O. 12731, 55 FR 42547, 3 CFR, 1990 Comp., p. 306; 5 CFR 2635... Commission 5 CFR Part 3401 Supplemental Standards of Ethical Conduct for Employees of the Federal...

  12. 75 FR 28517 - 2004 and 2006 Biennial Regulatory Reviews-Streamlining and Other Revisions of the Commission's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ...In this Notice of Proposed Rulemaking (NPRM), the Commission seeks comment on revisions to the Commission's rules governing the construction, marking, and lighting of antenna structures. The Commission initiates this proceeding to update and modernize the Commission's...

  13. 76 FR 78631 - Appalachian Power Company; Notice of Designation of Certain Commission Personnel as Non-Decisional

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Appalachian Power Company; Notice of Designation of Certain Commission Personnel as Non-Decisional Commission staff members Jon Cofrancesco (Office of Energy Projects (202)...

  14. Indexes to Nuclear Regulatory Commission issuances, July--December 1994. Volume 40, Index 2

    SciTech Connect

    1994-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board panel (LBP), the Administrative Law Judges, the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); Type of issuance (memorandum, order, decision, etc.).

  15. Indexes to Nuclear Regulatory Commission issuances: July--September 1994. Volume 40, Index 1

    SciTech Connect

    Not Available

    1994-12-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decision (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility), full text reference (volume and pagination), issuance number, issues raised by apellants, legal citations (cases, regulations, and statutes), name of facility, docket number, subject matter of issues and/or rulings, type of hearing (for construction permit, operating license, etc.), type of issuance (Memorandum, order, decision, etc.).

  16. Indexes to Nuclear Regulatory Commission issuances, July--December 1996. Volume 44, Index 2

    SciTech Connect

    1997-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by apellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (operating license, operating license amendment, etc.); type of issuance (memorandum, order, decision, etc.).

  17. Indexes to Nuclear Regulatory Commission issuances, July--September 1995. Volume 42, Index 1

    SciTech Connect

    1995-12-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.).

  18. Indexes to Nuclear Regulatory Commission issuances, January--March 1995. Volume 41, Index 1

    SciTech Connect

    1995-06-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.).

  19. Regulatory and technical reports: (Abstract index journal). Compilation for first quarter 1997, January--March

    SciTech Connect

    Sheehan, M.A.

    1997-06-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. This compilation is published quarterly and cummulated annually. Reports consist of staff-originated reports, NRC-sponsored conference reports, NRC contractor-prepared reports, and international agreement reports.

  20. Report to the US Nuclear Regulatory Commission on analysis and evaluation of operational data - 1987: Power reactors

    SciTech Connect

    1988-10-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1987. The report is published in two volumes. NUREG-1272, Vol. 2, No. 1, covers Power Reactors and presents an overview of the operating experience of the nuclear power industry, with comments regarding the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from Licensee Event Reports, the NRC's Operations Center, and Diagnostic Evaluations. NUREG-1272, Vol. 2, No. 2, covers Nonreactors and presents a review of the nonreactors events and misadministration reports that were reported in 1987 and a brief synopsis of AEOD studies published in 1987. Each volume contains a list of the AEOD Reports issued for 1980-1987.

  1. 77 FR 6557 - PJM Interconnection, L.L.C.; Supplemental Notice for Staff Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission PJM Interconnection, L.L.C.; Supplemental Notice for Staff Technical Conference Take notice that the staff technical conference in the above captioned proceeding, to be held...

  2. 76 FR 28025 - Verdant Power, LLC; Notice of Staff Participation in Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Verdant Power, LLC; Notice of Staff Participation in Meeting On May 24, 2011, Office of Energy Projects staff will participate by teleconference in a meeting with Verdant Power and state and federal agencies to...

  3. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... provided to the NRC on May 6, 2011. On September 30, 2011 (76 FR 60937), the NRC published a request for... COMMISSION Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory... Program for Steam Generators.'' This LR-ISG provides the NRC staff's evaluation of the suitability...

  4. U.S. Nuclear Regulatory Commission Role and Activities Related to U.S. Department of Energy Incidental Waste Determinations

    SciTech Connect

    Bradford, A.H.; Esh, D.W.; Ridge, A.C.

    2006-07-01

    Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. Under the NDAA, NRC performs consultative technical reviews of DOE's waste determinations and monitors DOE's disposal actions for such waste, but the NRC does not have regulatory authority over DOE's waste disposal activities. The NDAA provides the criteria that must be met to determine that waste is not HLW. The criteria require that the waste does not need to be disposed of in a geologic repository, that highly radioactive radionuclides be removed to the maximum extent practical, and that the performance objectives of 10 CFR 61, Subpart C, be met. The performance objectives contain criteria for protection of the public, protection of inadvertent intruders, protection of workers, and stability of the disposal site after closure. This paper describes NRC's approach to implementing its responsibilities under the NDAA, as well as similar activities being performed for sites not covered by the NDAA. (authors)

  5. Uranium recovery research sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory. Annual progress report, May 1982-May 1983

    SciTech Connect

    Foley, M.G.; Opitz, B.E.; Deutsch, W.J.; Peterson, S.R.; Gee, G.W.; Serne, R.J.; Hartley, J.N.; Thomas, V.W.; Kalkwarf, D.R.; Walters, W.H.

    1983-06-01

    Pacific Northwest Laboratory (PNL) is currently conducting research for the US Nuclear Regulatory Commission (NRC) on uranium recovery process wastes for both active and inactive operations. NRC-sponsored uranium recovery research at PNL is focused on NRC regulatory responsibilities for uranium-recovery operations: license active milling and in situ extraction operations; concur on the acceptability of DOE remedial-action plans for inactive sites; and license DOE to maintain inactive sites following remedial actions. PNL's program consists of four coordinated projects comprised of a program management task and nine research tasks that address the critical technical and safety issues for uranium recovery. Specifically, the projects endeavor to find and evaluate methods to: prevent erosion of tailings piles and prevent radon release from tailings piles; evaluate the effectiveness of interim stabilization techniques to prevent wind erosion and transport of dry tailings from active piles; estimate the dewatering and consolidation behavior of slurried tailings to promote early cover placement; design a cover-protection system to prevent erosion of the cover by expected environmental stresses; reduce seepage into ground water and prevent ground-water degradation; control solution movement and reaction with ground water in in-situ extraction operations; evaluate natural and induced restoration of ground water in in-situ extraction operations; and monitor releases to the environment from uranium recovery facilities.

  6. Court-agency interaction in environmental policymaking: the cases of the Nuclear Regulatory Commission and the Environmental Protection Agency

    SciTech Connect

    Thomas, L.W.

    1981-01-01

    This study examines the increasingly active participation of courts in the administrative process as well as agency responses to court-imposed policy shifts. More specifically, it is an investigation of the interaction between the federal courts, primarily the Supreme Court and the District of Columbia Court of Appeals, and two federal regulatory agencies, the Nuclar Regulatory Commission and the Environmental Protection Agency. There are five objectives to the study. The first is to examine the natura of court-agency interaction and to determine the extent to which patterns of judicial review of administrative actions can be discerned. The second is to examine the effect of court orders on agency programs and policies. The third is to assess the anticipatory dimension of court-agency relations. The fourth is to inquire into the recurring dimension of court-agency interaction and to determine its effect on subsequent court decisions. The last is to assess the institutional capacity of courts to deal with scientific and technological issues. This study indicates that judicial review has a substantial effect on the NRC's and the EPA's decision-making activities. Few, if any, recent major policy decisions of the two agencies have not been scrutinized closely by federal appellate courts. During the past decade, the courts have blocked policy initiative on numerous occasions and have been the primary source of change in others. In addition, the mere anticipation of judicial review was found to be a factor motivating the two agencies to make reasoned decisions.

  7. Nuclear Regulatory Commission Sunshine Act regulations. Hearing before the Subcommittee on Energy Conservation and Power of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, First Session, May 21, 1985

    SciTech Connect

    Not Available

    1985-01-01

    Nuclear Regulatory Commissioners and staff and representatives of Resources for the Future, Center for the Study of Responsive Law, and the Union of Concerned Scientists testified at a hearing held in response to a changed Commission meeting format allowing secret gatherings that would not have a formal transcript or written record for later assessment. Critics of the NRC's new regulation were opposed to both the concept of secret meetings and the fact that the Commissioners approved the plan without public comment. NRC Chairman Palladino countered that the change conforms with congressional intent as interpreted by the Supreme Court in a 1984 decision involving the Sunshine Act. At issue was the intent of the commissioners and the importance of public participation in the decision making process. Additional material submitted for the record follows the testimony of 12 witnesses.

  8. 77 FR 3766 - PJM Interconnection, L.L.C.; Notice of Staff Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... Energy Regulatory Commission PJM Interconnection, L.L.C.; Notice of Staff Technical Conference On... explore the issues presented by PJM Interconnection, L.L.C.'s (PJM) filing.\\1\\ Take notice that the... Commission's questions by February 10, 2012. \\1\\ PJM Interconnection, L.L.C., 137 FERC ] 61,204...

  9. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 3. Evaluation of potential for pipe breaks

    SciTech Connect

    Not Available

    1984-11-01

    The Executive Director for Operations (EDO) in establishing the Piping Review Committee concurred in its overall scope that included an evaluation of the potential for pipe breaks. The Pipe Break Task Group has responded to this directive. This report summarizes a review of regulatory documents and contains the Task Group's recommendations for application of the leak-before-break (LBB) approach to the NRC licensing process. The LBB approach means the application of fracture mechanics technology to demonstrate that high energy fluid piping is very unlikely to experience double-ended ruptures or their equivalent as longitudinal or diagonal splits. The Task Group's reommendations and discussion are founded on current and ongoing NRC staff actions as presented in Section 3.0 of this report. Additional more detailed comments and discussion are presented in Section 5.0 and in Appendices A and B. The obvious issues are the reexamination of the large pipe break criteria and the implications of any changes in the criteria as they influence items such as jet loads and pipe whip. The issues have been considered and the Task Group makes the following recommendations.

  10. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 4. Evaluation of other loads and load combinations

    SciTech Connect

    Not Available

    1984-12-01

    Six topical areas were covered by the Task Group on Other Dynamic Loads and Load Combinations as described below: Event Combinations - dealing with the potential simultaneous occurrence of earthquakes, pipe ruptures, and water hammer events in the piping design basis; Response Combinations - dealing with multiply supported piping with independent inputs, the sequence of combinations between spacial and modal components of response, and the treatment of high frequency modes in combination with low frequency modal responses; Stress Limits/Dynamic Allowables - dealing with inelastic allowables for piping and strain rate effects; Water Hammer Loadings - dealing with code and design specifications for these loadings and procedures for identifying potential water hammer that could affect safety; Relief Valve Opening and Closing Loads - dealing with the adequacy of analytical tools for predicting the effects of these events and, in addition, with estimating effective cycles for fatigue evaluations; and Piping Vibration Loads - dealing with evaluation procedures for estimating other than seismic vibratory loads, the need to consider reciprocating and rotary equipment vibratory loads, and high frequency vibratory loads. NRC staff recommendations or regulatory changes and additional study appear in this report.

  11. 77 FR 65645 - Retrospective Analysis of Existing Rules: Notice of Staff Memorandum

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ... Energy Regulatory Commission 18 CFR Chapter I Retrospective Analysis of Existing Rules: Notice of Staff..., 2011 Plan for Retrospective Analysis of Existing Rules prepared in response to Executive Order 13579, which requested independent regulatory agencies issue plans for periodic retrospective analysis of...

  12. 77 FR 5791 - Ocean Renewable Power Company Maine, LLC; Notice of Staff Participation in Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Ocean Renewable Power Company Maine, LLC; Notice of Staff Participation in... representatives from Ocean Renewable Power Company Maine, LLC at the Federal Energy Regulatory...

  13. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    SciTech Connect

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.

  14. 78 FR 56750 - Interim Staff Guidance on Environmental Issues Associated With New Reactors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ...The U.S Nuclear Regulatory Commission (NRC) staff is issuing for use of, and to solicit public comment on, draft Interim Staff Guidance (ISG) ESP/COL-ISG-026, ``Interim Staff Guidance on Environmental Issues Associated with New Reactors.'' The purpose of this ISG is to clarify the NRC guidance and application of NUREG 1555, ``Standard Review Plans for Environmental Reviews for Nuclear Power......

  15. 10 CFR 52.143 - Staff approval of design.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Staff approval of design. 52.143 Section 52.143 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... under this subpart and receipt of a report by the Advisory Committee on Reactor Safeguards under §...

  16. 10 CFR 52.143 - Staff approval of design.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Staff approval of design. 52.143 Section 52.143 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... under this subpart and receipt of a report by the Advisory Committee on Reactor Safeguards under §...

  17. Vital area identification for U.S. Nuclear Regulatory Commission nuclear power reactor licensees and new reactor applicants.

    SciTech Connect

    Whitehead, Donnie Wayne; Varnado, G. Bruce

    2008-09-01

    U.S. Nuclear Regulatory Commission nuclear power plant licensees and new reactor applicants are required to provide protection of their plants against radiological sabotage, including the placement of vital equipment in vital areas. This document describes a systematic process for the identification of the minimum set of areas that must be designated as vital areas in order to ensure that all radiological sabotage scenarios are prevented. Vital area identification involves the use of logic models to systematically identify all of the malicious acts or combinations of malicious acts that could lead to radiological sabotage. The models available in the plant probabilistic risk assessment and other safety analyses provide a great deal of the information and basic model structure needed for the sabotage logic model. Once the sabotage logic model is developed, the events (or malicious acts) in the model are replaced with the areas in which the events can be accomplished. This sabotage area logic model is then analyzed to identify the target sets (combinations of areas the adversary must visit to cause radiological sabotage) and the candidate vital area sets (combinations of areas that must be protected against adversary access to prevent radiological sabotage). Any one of the candidate vital area sets can be selected for protection. Appropriate selection criteria will allow the licensee or new reactor applicant to minimize the impacts of vital area protection measures on plant safety, cost, operations, or other factors of concern.

  18. U.S. Nuclear Regulatory Commission Extremely Low Probability of Rupture pilot study : xLPR framework model user's guide.

    SciTech Connect

    Kalinich, Donald A.; Sallaberry, Cedric M.; Mattie, Patrick D.

    2010-12-01

    For the U.S. Nuclear Regulatory Commission (NRC) Extremely Low Probability of Rupture (xLPR) pilot study, Sandia National Laboratories (SNL) was tasked to develop and evaluate a probabilistic framework using a commercial software package for Version 1.0 of the xLPR Code. Version 1.0 of the xLPR code is focused assessing the probability of rupture due to primary water stress corrosion cracking in dissimilar metal welds in pressurizer surge nozzles. Future versions of this framework will expand the capabilities to other cracking mechanisms, and other piping systems for both pressurized water reactors and boiling water reactors. The goal of the pilot study project is to plan the xLPR framework transition from Version 1.0 to Version 2.0; hence the initial Version 1.0 framework and code development will be used to define the requirements for Version 2.0. The software documented in this report has been developed and tested solely for this purpose. This framework and demonstration problem will be used to evaluate the commercial software's capabilities and applicability for use in creating the final version of the xLPR framework. This report details the design, system requirements, and the steps necessary to use the commercial-code based xLPR framework developed by SNL.

  19. OVERVIEW OF THE U.S. DEPARTMENT OF ENERGY AND NUCLEAR REGULATORY COMMISSION PERFORMANCE ASSESSMENT APPROACHES: CEMENTITIOUS BARRIERS PARTNERSHIP

    SciTech Connect

    Langton, C.; Burns, H.

    2009-05-29

    a need to assess the behavior of cementitious materials for applications in environmental remediation and decontamination and decommissioning (D&D) applications. The ability to assess the use and benefits of cementitious materials for these applications can significantly affect decisions related to cleanup activities. For example the need for costly remedial actions may not be necessary if existing or new cementitious barriers were adequately represented. The sections dealing with regulatory considerations include summaries of the different regulations that are relevant for various applications involving cementitious materials. A summary of regulatory guidance and/or policies pertaining to performance assessment of cementitious materials and sensitivity and uncertainty analyses is also provided in the following chapters. Numerous examples of specific applications are provided in each report. The examples are organized into traditional waste disposal applications (performance assessments), applications related to environmental remediation and D&D, and reactor and spent fuel related assessments. Sections that discuss specific facilities or sites contain: (1) descriptions of the role of the cementitious barriers or sensitivity/uncertainty analysis, (2) parameter assumptions and conceptual models, and (3) a relative discussion of the significance in the context of the assessment. Examples from both the U.S. Department of Energy Sites and the U.S. Nuclear Regulatory Commission are provided to illustrate the variety of applications and approaches that have been used. In many cases, minimal credit was taken for cementitious barriers. However, in some of those cases, benefits of being able to take credit for barriers were identified. The examples included: (1) disposal facilities (vaults, trenches, tank closures, cementitious waste forms and containers, etc.), (2) environmental remediation (old disposal facilities), (3) reactor and large structure decommissioning, and (4

  20. 77 FR 10502 - PJM Interconnection, L.L.C.; Notice Establishing Post-Staff Technical Conference Comment Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission PJM Interconnection, L.L.C.; Notice Establishing Post-Staff Technical Conference Comment Period As indicated in the February 2, 2012 Supplement Notice, Supplemental Notice For Staff Technical Conference, in the...

  1. 78 FR 55117 - Ultimate Heat Sink for Nuclear Power Plants; Draft Regulatory Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-09

    ...The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-1275, ``Ultimate Heat Sink for Nuclear Power Plants.'' This regulatory guide (RG) describes methods and procedures acceptable to the NRC staff that nuclear power plant facility licensees and applicants may use to implement general design criteria (GDC) that are applicable to the ultimate......

  2. Nuclear Regulatory Commission Issuances

    SciTech Connect

    1996-05-01

    This report contains the issuances received during the specified period from the Atomic Safety and Licensing Board only. The two issuances included relate to: (1) suspension of byproduct material license for Eastern Testing and Inspection, Inc., and (2) license renewal for the Georgia Tech research reactor.

  3. 76 FR 49764 - Notice of FERC Staff Attendance at the Entergy ICT Transmission Planning Summit and Entegry...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy ICT Transmission Planning... Commission's ongoing outreach efforts. Entergy ICT Transmission Planning Summit August 23, 2011 (8 a.m.-5...

  4. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... COMMISSION Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan, Section 13.6.1, Revision 1 on Physical Security--Combined License and Operating Reactors AGENCY: Nuclear Regulatory Commission (NRC). ACTION: Notice of Availability. SUMMARY: The NRC is issuing its Final Revision...

  5. 77 FR 55231 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... to discuss development of the guidance for compliance with Order EA-12-050. On June 7, 2012 (77 FR... COMMISSION Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...: Nuclear Regulatory Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim...

  6. 77 FR 55230 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... development of the guidance for compliance with Order EA-12-049. On June 7, 2012 (77 FR 33779), the NRC... COMMISSION Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With... Beyond-Design-Basis External Events AGENCY: Nuclear Regulatory Commission (NRC). ACTION: Japan...

  7. 77 FR 55232 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... development of the guidance for ] compliance with Order EA-12-051. On June 7, 2012 (77 FR 33780), the NRC... COMMISSION Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...: Nuclear Regulatory Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate Interim...

  8. USING TECHNOLOGY TO SUPPORT PROACTIVE MANAGEMENT OF MATERIALS DEGRADATION FOR THE U.S. NUCLEAR REGULATORY COMMISSION

    SciTech Connect

    Taylor, W Boyd; Knobbs, Katherine J.; Carpenter, C. E.; Malik, Shah

    2010-07-19

    The majority of the U.S. reactor fleet is applying for license renewal to extend the operating life from the current 40 years to 60 years, and there is now active interest in extending the operating life to beyond 60 years. Many plants are also applying for increases in power rating and both of these changes increases the need for an improved understanding of materials degradation. Many materials degrade over time and much is known about the degradation of materials under normal environmental conditions; however, less is known about the characteristics of materials degradation when the environment is subject to higher than normal radiological conditions over extended periods of time. Significant efforts are being made by industrial, academic and regulatory groups worldwide to identify, classify and mitigate potential problems arising from degradation of components in this context. From a regulatory perspective, the U.S. Nuclear Regulatory Commission (USNRC) is very interested in being able to identify ways to insure their licensees proactively manage the identification of materials degradation and the mitigation of its effects. To date, the USNRC has consolidated “generic” programs for mitigating aging issues in the two volume Generic Aging Lessons Learned (GALL) Report (NUREG-1801) [1][2], and have encouraged applicants for license renewal to use these programs where applicable in their plant when applying for renew of their reactor’s license. The USNRC has also published a comprehensive report entitled Expert Panel Report on Proactive Materials Degradation (NUREG/CR-6923) [3] that inventories the types of degradation mechanisms that could exist in each component of a Light Water Reactor (LWR) and each degradation mechanism is assessed regarding how much is known about mitigating its effects. Since the number of plant designs and materials used varies greatly within the U.S. fleet, there are many variations to implementing aging management programs (AMPs

  9. 33 CFR Appendix B to Part 221 - Federal Energy Regulatory Commission Form L-3 (Revised October 1975)

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... force for construction of any such alterations to the project. Construction of said alterations or any... operation, as may be ordered by the Commission upon its own motion or upon the recommendation of the... Commission during the term of this license upon its own motion or upon the recommendation of the Secretary...

  10. 78 FR 44355 - Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ...: Action Date FR Cite Staff Sent Briefing Package to 09/21/11 Commission. NPRM 11/08/11 76 FR 69586... in the Federal 12/05/12 77 FR 72205 Register. Regulatory Flexibility Analysis Required: Yes. Agency... unanimously on November 8, 2012, and the final rule was published December 10, 2012 (77 FR 73294)....

  11. Nuclear Regulatory Commission Issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders. Progress report, January 1, 1996--June 30, 1996. Volume 43, pages 1-358

    SciTech Connect

    1997-05-01

    The hardbound edition of the Nuclear Regulatory Issuances is a final compilation of the monthly issuances. It includes all legal precedents for the agency within a six month period. This is the forty-third volume of issuances.

  12. 75 FR 76050 - Notice of the Nuclear Regulatory Commission Consent to Indirect Change of Control and Issuance of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... Federal Register on September 20, 2010 (75 FR 57300) with a deadline for submitting a request for hearing... requesting a hearing for Materials License 49-29384-01 has not expired, 10 CFR 2.1316 directs the staff to... ML102940435 Information, October 18, 2010. 4 Request to Amend License No. 49-29384-01, June ML102100530...

  13. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Kent Norris

    2010-03-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  14. A self-teaching curriculum for the NRC/SNL (Nuclear Regulatory Commission/Sandia National Laboratory) low-level waste performance assessment methodology

    SciTech Connect

    Chu, M.S.Y.; Kozak, M.W.; Campbell, J.E. ); Thompson, B.H. )

    1991-01-01

    A performance assessment methodology has been developed for use by the US Nuclear Regulatory Commission in evaluating license applications for low-level waste disposal facilities. This report provides detailed guidance on input and output procedures for the computer codes recommended for use in the methodology. Seven sample problems are provided for various aspects of a performance assessment analysis of a simple hypothetical conceptual model. When combined, these sample problems demonstrate how the methodology is used to produce a dose history for the site under normal conditions, and to demonstrate an analysis of an intruder scenario. 20 refs., 26 figs., 4 tabs.

  15. A compilation of reports of the Advisory Committee on Reactor Safeguards, 1997 annual, U.S. Nuclear Regulatory Commission. Volume 19

    SciTech Connect

    1998-04-01

    This compilation contains 67 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1997. It also includes a report to the Congress on the NRC Safety Research Program. Specific topics include: (1) advanced reactor designs, (2) emergency core cooling systems, (3) fire protection, (4) generic letters and issues, (5) human factors, (6) instrumentation, control and protection systems, (7) materials engineering, (8) probabilistic risk assessment, (9) regulatory guides and procedures, rules, regulations, and (10) safety research, philosophy, technology and criteria.

  16. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Kent Norris

    2010-02-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  17. Time to Reject the Linear-No Threshold Hypothesis and Accept Thresholds and Hormesis: A Petition to the U.S. Nuclear Regulatory Commission.

    PubMed

    Marcus, Carol S

    2015-07-01

    On February 9, 2015, I submitted a petition to the U.S. Nuclear Regulatory Commission (NRC) to reject the linear-no threshold (LNT) hypothesis and ALARA as the bases for radiation safety regulation in the United States, using instead threshold and hormesis evidence. In this article, I will briefly review the history of LNT and its use by regulators, the lack of evidence supporting LNT, and the large body of evidence supporting thresholds and hormesis. Physician acceptance of cancer risk from low dose radiation based upon federal regulatory claims is unfortunate and needs to be reevaluated. This is dangerous to patients and impedes good medical care. A link to my petition is available: http://radiationeffects.org/wp-content/uploads/2015/03/Hormesis-Petition-to-NRC-02-09-15.pdf, and support by individual physicians once the public comment period begins would be extremely important. PMID:26018704

  18. Diversification of the Faculty and Staff in California Public Postsecondary Education from 1977 to 1987. The Fifth in the Commission's Series of Biennial Reports on Equal Employment Opportunity in California's Public Colleges and Universities. Commission Report 88-29.

    ERIC Educational Resources Information Center

    California State Postsecondary Education Commission, Sacramento.

    Information is provided in narrative and tabular form on the gender, ethnic, and racial composition of faculty and staff in the California State University, the University of California, and the California Community Colleges for 1987-88. Reports and data are presented in the following groupings: (1) report of the California Postsecondary Education…

  19. 75 FR 33227 - 2010 Quadrennial Regulatory Review-Review of the Commission's Broadcast Ownership Rules and Other...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... of our ownership rules on investigative journalism? If so, should the Commission consider only investigative journalism in broadcast media or across all media? If commenters believe that it should undertake... is necessary to preserve or enhance the availability of news and information and journalism, and,...

  20. How Regulatory Risk Has Moved Front and Center in the Tug-of-War between State Commissions and Public Utilities

    SciTech Connect

    Keglevic, Paul; McConomy, John; Koppin, John

    2006-11-15

    Deregulation of generation, volatile commodity markets and an increase in proposed utility mergers have heightened the stakes in the historic struggle of public service commissions to balance the interests of ratepayers and shareholders. The authors review this struggle and its impact on recent requests for rate increases and the pending approval of several mergers announced in the past few years. (author)

  1. Regulatory and technical reports (abstract index journal). Compilation for third quarter 1997, July--September

    SciTech Connect

    Stevenson, L.L.

    1998-01-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually. This report contains the third quarter 1997 abstracts.

  2. 77 FR 26537 - Notice of Commissioners and Staff Attendance at FERC Leadership Development Program Graduation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... Energy Regulatory Commission Notice of Commissioners and Staff Attendance at FERC Leadership Development... Leadership Development Program Graduation/Induction Ceremony: 888 First Street NE., Washington, DC 20426. May... 2012 Leadership Development Program and graduate 15 employees from the 2011 program. Dated: April...

  3. 18 CFR 2.1b - Availability in contested cases of information acquired by staff investigation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Availability in... Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY... Availability in contested cases of information acquired by staff investigation. Pursuant to the...

  4. 18 CFR 2.1b - Availability in contested cases of information acquired by staff investigation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Availability in... Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY... Availability in contested cases of information acquired by staff investigation. Pursuant to the...

  5. 18 CFR 2.1b - Availability in contested cases of information acquired by staff investigation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Availability in... Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY... Availability in contested cases of information acquired by staff investigation. Pursuant to the...

  6. 18 CFR 2.1b - Availability in contested cases of information acquired by staff investigation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Availability in... Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY... Availability in contested cases of information acquired by staff investigation. Pursuant to the...

  7. 18 CFR 2.1b - Availability in contested cases of information acquired by staff investigation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Availability in contested cases of information acquired by staff investigation. 2.1b Section 2.1b Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND INTERPRETATIONS Statements of...

  8. 77 FR 24199 - Notice of Staff Attendance at Southwest Power Pool Regional Entity Trustee, Regional State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... open to the public. For more information, contact Patrick Clarey, Office of Energy Market Regulation... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Staff Attendance at Southwest Power Pool Regional Entity...

  9. 10 CFR 2.1316 - Authority and role of NRC staff.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Authority and role of NRC staff. 2.1316 Section 2.1316 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2.1316 Authority and role of NRC...

  10. 10 CFR 2.1316 - Authority and role of NRC staff.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Authority and role of NRC staff. 2.1316 Section 2.1316 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2.1316 Authority and role of NRC...

  11. 77 FR 24952 - Staff Technical Conference on Geomagnetic Disturbances to the Bulk-Power System; Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... Energy Regulatory Commission Staff Technical Conference on Geomagnetic Disturbances to the Bulk-Power.... to 4:00 p.m. to discuss issues related to the reliability of the Bulk-Power System as affected by... currents to transformers and other equipment on the Bulk-Power System, as well as, options for...

  12. 78 FR 68834 - Exelon Generation Company, LLC; Notice of Staff Attendance at Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Exelon Generation Company, LLC; Notice of Staff Attendance at Meeting On... timeline for Exelon Generation Company's Conowingo Hydroelectric Project No. 405. The Open House will...

  13. 75 FR 2140 - Florida Gas Transmission Company, LLC; Notice of Staff Protest to Proposed Blanket Certificate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... Energy Regulatory Commission Florida Gas Transmission Company, LLC; Notice of Staff Protest to Proposed... Florida Gas Transmission Company, LLC (FGT) on October 29, 2009 in the above referenced docket. Pursuant... processed as a case-specific application filed under section 7(c) of the Natural Gas Act (NGA) and Part...

  14. 76 FR 64082 - Mandatory Reliability Standards for the Bulk-Power System; Notice of Staff Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... Reliability Standard, Order No. 754, 76 FR 58716 (September 22, 2011), 136 FERC ] 61,186, at P 19 (2011). \\3... Energy Regulatory Commission Mandatory Reliability Standards for the Bulk-Power System; Notice of Staff... Discussion on the reliability issues relating to ``Single Point of Failure on Protection Systems,'' on...

  15. 78 FR 66915 - Supplemental Notice for Staff Technical Conference; PJM Interconnection, L.L.C.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Supplemental Notice for Staff Technical Conference; PJM Interconnection, L.L.C. As announced in the Notice of Technical Conference issued on October 11, 2013, there will be...

  16. 77 FR 66609 - Notice of FERC Staff Attendance; PacifiCorp, et al.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance; PacifiCorp, et al. Docket No. Deseret Generation & Transmission ER13-65-000 Cooperative, Inc. Northwestern Corporation (Montana)..... ER13-67-000 Portland General Electric...

  17. 77 FR 6131 - Memorandum of Understanding Between the U.S. Nuclear Regulatory Commission and the Department of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... the location of the proposed facility to terrorist attack. II. Background Nuclear Regulatory... application, the NRC addresses potential vulnerabilities of the location of the proposed facility to terrorist... to secure America by preventing, deterring, and responding to terrorist attacks and other ]...

  18. From gas to electric at FERC: Will it be deja vu all over again. [Federal Energy Regulatory Commission

    SciTech Connect

    Bobbish, D.J. )

    1992-06-01

    Recent legislative proposals to increase FERC's authority to require electric utilities to provide transmission service to third parties ( wheeling') and to encourage the development of independent power producers (IPPs) suggest that FERC may soon have the necessary legislative mandate to 436' the electric utility industry - to pursue at a faster pace the same sort of restructuring it has been following since at least 1988. In view of the possibility that the electric industry may be reformed in a way that parallels the natural gas industry in some fashion, this paper examines how the Commission has gone about restructuring the natural gas industry over the past seven years, and what lessons the Commission should have learned from that experience and whether recent developments at FERC on the electric side indicate that it has learned those lessons.

  19. Staff Report to the Senior Department Official on Recognition Compliance Issues. Recommendation Page: National Accrediting Commission Of Cosmetology Arts and Sciences

    ERIC Educational Resources Information Center

    US Department of Education, 2010

    2010-01-01

    The National Accrediting Commission of Cosmetology Arts and Sciences (NACCAS) is a national accreditor whose scope of recognition is for the accreditation throughout the United States of postsecondary schools and departments of cosmetology arts and sciences and massage therapy. The agency accredits approximately 1,300 institutions offering…

  20. Staff Report to the Senior Department Official on Recognition Compliance Issues. Recommendation Page: North Central Association of Colleges and Schools, the Higher Learning Commission

    ERIC Educational Resources Information Center

    US Department of Education, 2010

    2010-01-01

    The Higher Learning Commission (HLC or the agency) is a regional institutional accreditor that accredits (or preaccredits) over 1,000 degree granting institutions in 19 states, tribal institutions and including those programs offered via distance education within these institutions. Most of the institutions accredited by HLC use the Secretary's…

  1. 45 CFR 701.12 - Staff Director.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Staff Director. 701.12 Section 701.12 Public... FUNCTIONS OF THE COMMISSION Organization Statement § 701.12 Staff Director. A Staff Director for the Commission is appointed by the President with the concurrence of a majority of the Commissioners. The...

  2. 19 CFR 207.17 - Staff report.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Staff report. 207.17 Section 207.17 Customs Duties... EXPORTS TO THE UNITED STATES Preliminary Determinations § 207.17 Staff report. Prior to the Commission's preliminary determination, the Director shall submit to the Commission a staff report. A public version of...

  3. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  4. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  5. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  6. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  7. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  8. Requiring an Office of Investigations within the Nuclear Regulatory Commission. Introduced in the House of Representatives, One Hundredth Congress, Second Session, September 29, 1988

    SciTech Connect

    Not Available

    1988-01-01

    This bill amends the Energy Reorganization Act of 1974 to add a new section 205A that establishes within the Nuclear Regulatory Commission (NRC) a statutory Office of Investigation (OI) and establishes a director of this office who reports directly to the five NRC Commissioners. The new section also sets out the responsibility of the office for initiating and conducting investigations into violations of laws the NRC implements that relate to violations involving wrongdoing. The OI is charged with reporting violations of federal criminal law to the Department of Justice. The Committee on Energy and Commerce considered the bill, report favorably on it without amendment, and recommend its passage by the whole House of Representatives.

  9. Regulatory and technical reports (abstract index journal). Volume 20, No. 2: Compilation for second quarter April--June 1995

    SciTech Connect

    1995-09-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually.

  10. Environmental externalities: A survey of state commission actions

    SciTech Connect

    Cohen, S.D.; Eto, J.H.; Goldman, C.A.; Beldock, J.; Crandall, G.

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC`s Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a ``snapshot`` of regulatory developments in an area that is evolving rapidly. 16 refs.

  11. Environmental externalities: A survey of state commission actions

    SciTech Connect

    Cohen, S.D.; Eto, J.H. ); Goldman, C.A. ); Beldock, J. . Office of Buildings and Community Systems); Crandall, G. )

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC's Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a snapshot'' of regulatory developments in an area that is evolving rapidly. 16 refs.

  12. 77 FR 46127 - Interim Staff Guidance on Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ...The U.S. Nuclear Regulatory Commission (NRC) is issuing the final License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-03, ``Changes to GALL Report Revision 2 Aging Management Program (AMP) XI.M41, `Buried and Underground Piping and Tanks'.'' This LR-ISG provides changes to the recommendations in GALL Report Revision 2 AMP XI.M41 based on the staff's review of several license renewal......

  13. Nuclear Regulatory Commission inspection program and the Oyster Creek, N. J. , nuclear facility. Hearings before a subcommittee of the Committee on Government Operations, House of Representatives, Ninety-sixth Congress, Second Session

    SciTech Connect

    Not Available

    1980-01-01

    A congressional hearing was held May 28, 1980 by the Environment, Energy and Natural Resources Subcommittee of the Committee on Government Operations to discuss the Nuclear Regulatory Commission Inspection Program and the Oyster Creek Nuclear Power Plant. This discussion included an explanation of the responsibilities now facing the Nuclear Regulatory Commission, particularly the insurance that the 68 operating nuclear power reactors are operated safely and completely by licensees with sound management practices. In addition, an explanation was given of the emergency shutdown of Oyster Creek-1 Reactor.

  14. Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2010, Prepared for the Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, May 2012

    SciTech Connect

    D. E. Lewis D. A. Hagemeyer Y. U. McCormick

    2012-07-07

    This report summarizes the occupational exposure data that are maintained in the U.S. Nuclear Regulatory Commission’s (NRC) Radiation Exposure Information and Reporting System (REIRS). The bulk of the information contained in the report was compiled from the 2010 annual reports submitted by five of the seven categories of NRC licensees subject to the reporting requirements of 10 CFR 20.2206. Because there are no geologic repositories for high-level waste currently licensed and no NRC-licensed low-level waste disposal facilities currently in operation, only five categories will be considered in this report. The annual reports submitted by these licensees consist of radiation exposure records for each monitored individual. These records are analyzed for trends and presented in this report in terms of collective dose and the distribution of dose among the monitored individuals. Annual reports for 2010 were received from a total of 190 NRC licensees. The summation of reports submitted by the 190 licensees indicated that 192,424 individuals were monitored, 81,961 of whom received a measurable dose. When adjusted for transient workers who worked at more than one licensee during the year, there were actually 142,471 monitored individuals and 62,782 who received a measurable dose. The collective dose incurred by these individuals was 10,617 person-rem, which represents a 12% decrease from the 2009 value. This decrease was primarily due to the decrease in collective dose at commercial nuclear power reactors, as well as a decrease in the collective dose for most of the other categories of NRC licensees. The number of individuals receiving a measurable dose also decreased, resulting in an average measurable dose of 0.13 rem for 2010. The average measurable dose is defined as the total effective dose equivalent (TEDE) divided by the number of individuals receiving a measurable dose. In calendar year 2010, the average annual collective dose per reactor for light water reactor

  15. 75 FR 71123 - Notice of Commissioners and Staff Attendance at FERC/NARUC Collaborative on Smart Response Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioners and Staff Attendance at FERC/NARUC Collaborative on... meeting: FERC/NARUC Collaborative on Smart Response: Omni Hotel at CNN Center, 100 CNN Center, Atlanta,...

  16. 10 CFR 2.1327 - Application for a stay of the effectiveness of NRC staff action on license transfer.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Application for a stay of the effectiveness of NRC staff action on license transfer. 2.1327 Section 2.1327 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES OF PRACTICE AND PROCEDURE Procedures for Hearings on License Transfer Applications § 2.1327 Application for...

  17. 10 CFR 2.1327 - Application for a stay of the effectiveness of NRC staff action on license transfer.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Application for a stay of the effectiveness of NRC staff action on license transfer. 2.1327 Section 2.1327 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License...

  18. 10 CFR 2.1327 - Application for a stay of the effectiveness of NRC staff action on license transfer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Application for a stay of the effectiveness of NRC staff action on license transfer. 2.1327 Section 2.1327 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License...

  19. 10 CFR 2.1327 - Application for a stay of the effectiveness of NRC staff action on license transfer.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Application for a stay of the effectiveness of NRC staff action on license transfer. 2.1327 Section 2.1327 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES OF PRACTICE AND PROCEDURE Procedures for Hearings on License Transfer Applications § 2.1327 Application for...

  20. 10 CFR 2.1327 - Application for a stay of the effectiveness of NRC staff action on license transfer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Application for a stay of the effectiveness of NRC staff action on license transfer. 2.1327 Section 2.1327 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License...

  1. 76 FR 35922 - Interim Staff Guidance Regarding the Environmental Report for Applications To Construct and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... Operate Medical Isotope Production Facilities AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff... Guidance Regarding the Environmental Report for Applications to Construct and/or Operate Medical Isotope... operate a medical isotope production facility. The draft ISG is located in the Agencywide Documents...

  2. 76 FR 62804 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Work Group and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State Committee Work... outreach efforts. Entergy Regional State Committee Work Group and Stakeholder Meeting October 19, 2011 (9...

  3. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... Section 13.6.3, Revision 1 on Physical Security--Early Site Permit AGENCY: Nuclear Regulatory Commission....6.3, Revision 1 on Physical Security--Early Site Permit (Agencywide Documents Access and Management... staff issued the proposed Revision 1 on SRP Section 13.6.3 on ``Physical Security--Early Site...

  4. 75 FR 8412 - Office of New Reactors: Interim Staff Guidance on Assessing Ground Water Flow and Transport of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Office of New Reactors: Interim Staff Guidance on Assessing Ground Water Flow and Transport of... Sections 2.4.12 and 2.4.13 regarding the assessment of ground water flow and transport of...

  5. 76 FR 37808 - PJM Interconnection, L.L.C.; Notice of Discussion Topics for Staff Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission PJM Interconnection, L.L.C.; Notice of Discussion Topics for Staff Technical... suspended proposed tariff changes submitted by PJM Interconnection, L.L.C. (PJM), subject to refund and...

  6. 75 FR 6021 - Florida Gas Transmission Company, LLC; Notice of Withdrawal of Staff Protest to Proposed Blanket...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... Energy Regulatory Commission Florida Gas Transmission Company, LLC; Notice of Withdrawal of Staff Protest...) and noticed on November 9, 2009,\\1\\ Florida Gas Transmission Company, LLC proposed to replace, upgrade... of the request was published in the Federal Register on November 17, 2009 (74 FR 59,161). Kimberly...

  7. 76 FR 60937 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-02; Aging Management Program for Steam...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Generators AGENCY: Nuclear Regulatory Commission. ACTION: Request for public comment. SUMMARY: The U.S...), LR-ISG-2011-02, ``Aging Management Program for Steam Generators,'' for public comment. This Draft LR... steam generator aging. The Draft LR-ISG revises the NRC staff's aging management...

  8. 77 FR 73057 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-05; Performance of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ...The U.S. Nuclear Regulatory Commission (NRC) is issuing the Final Japan Lessons-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-05, ``Performance of an Integrated Assessment'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12311A214). This JLD-ISG provides guidance and clarification to assist nuclear power reactors applicants and licensees......

  9. 75 FR 62893 - Draft Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... COMMISSION Draft Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Draft Regulatory Guide, DG-1196, ``Qualification for Cement... Commission (NRC) is issuing for public comment a draft guide in the agency's ``Regulatory Guide''...

  10. ASSESSMENT OF CAPABILITIES AND RESEARCH NEEDS IN THE AREA OF HEALTH EFFECTS OF LOW-LEVEL IONIZING RADIATION: A JOINT REPORT TO THE CONGRESS BY THE U.S. ENVIRONMENTAL PROTECTION AGENCY, AND THE U.S. NUCLEAR REGULATORY COMMISSION

    EPA Science Inventory

    The report summarizes the capabilities, research needs and on-going projects of the Environmental Protection Agency and the Nuclear Regulatory Commission related to the health effects of low-level ionizing radiation. The statutory authorities of both EPA and NRC related to radiat...

  11. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  12. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  13. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  14. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  15. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  16. Nuclear Regulatory Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... amounts appropriated from the Nuclear Waste Fund, amounts appropriated for Waste Incidental to... December 7, 2009 (74 FR 64572). ADDRESSES: Comments on any rule in the agenda may be sent to the Secretary... occurred on rules since publication of the last NRC semiannual agenda on December 7, 2009 (74 FR...

  17. Comparison of Standard Light Water Reactor Cross-Section Libraries using the United States Nuclear Regulatory Commission Boiling Water Reactor Benchmark Problem

    NASA Astrophysics Data System (ADS)

    Kulesza, Joel A.; Arzu Alpan, F.

    2016-02-01

    This paper describes a comparison of contemporary and historical light water reactor shielding and pressure vessel dosimetry cross-section libraries for a boiling water reactor calculational benchmark problem. The calculational benchmark problem was developed at Brookhaven National Laboratory by the request of the U. S. Nuclear Regulatory Commission. The benchmark problem was originally evaluated by Brookhaven National Laboratory using the Oak Ridge National Laboratory discrete ordinates code DORT and the BUGLE-93 cross-section library. In this paper, the Westinghouse RAPTOR-M3G three-dimensional discrete ordinates code was used. A variety of cross-section libraries were used with RAPTOR-M3G including the BUGLE93, BUGLE-96, and BUGLE-B7 cross-section libraries developed at Oak Ridge National Laboratory and ALPAN-VII.0 developed at Westinghouse. In comparing the calculated fast reaction rates using the four aforementioned cross-section libraries in the pressure vessel capsule, for six dosimetry reaction rates, a maximum relative difference of 8% was observed. As such, it is concluded that the results calculated by RAPTOR-M3G are consistent with the benchmark and further that the different vintage BUGLE cross-section libraries investigated are largely self-consistent.

  18. 77 FR 47050 - Commission Information Collection Activities; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities; Comment Request AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Comment request. SUMMARY: In compliance with...

  19. The core to regulatory reform

    SciTech Connect

    Partridge, J.W. Jr.

    1993-06-15

    Federal Energy Regulatory Commission (FERC) Orders 436, 500, and 636, the Clean Air Act Amendments of 1990, Public Utility Holding Company Act reform, and the 1992 Energy Policy Act all can have significant effects on an LDC's operations. Such changes in an LDC's environments must be balanced by changes within the utility, its marketplace, and its state regulatory environment. The question is where to start. For Columbia Gas Distribution Cos., based in Columbus, OH, the new operating foundation begins with each employee. Internal strength is critical in designing initiatives that meet the needs of the marketplace and are well-received by regulators. Employees must understand not only the regulatory environment in which the LDC operates, but also how their work contributes to a positive regulatory relationship. To achieve this, Columbia initiated the COntinuing Regulatory Education program, or CORE, in 1991. CORE is a regulatory-focused, information-initiative program coordinated by Columbia's Regulatory Policy, Planning, and Government Affairs Department. The CORE programs can take many forms, such as emerging issue discussions, dialogues with regulators and key parties, updates on regulatory fillings, regulatory policy meetings, and formal training classes. The speakers and discussion facilitators can range from human resource department trainers to senior officers, from regulatory department staff members to external experts, or from state commissioners to executives from other LDCs. The goals of CORE initiatives are to: Support a professional level of regulatory expertise through employee participation in well-developed regulatory programs presented by credible experts. Encourage a constructive state regulatory environment founded on communication and cooperation. CORE achieves these goals via five program levels: introductory basics, advanced learning, professional expertise, crossfunctional dialogues, and external idea exchanges.

  20. 10 CFR 2.1505 - Role of the NRC staff.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Role of the NRC staff. 2.1505 Section 2.1505 Energy... Legislative Hearings § 2.1505 Role of the NRC staff. The NRC staff shall be available to answer any Commission... officer may request without requiring the NRC staff to assume the role of an advocate. The NRC staff...

  1. 10 CFR 2.1505 - Role of the NRC staff.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Role of the NRC staff. 2.1505 Section 2.1505 Energy... Legislative Hearings § 2.1505 Role of the NRC staff. The NRC staff shall be available to answer any Commission... officer may request without requiring the NRC staff to assume the role of an advocate. The NRC staff...

  2. Comparison of Standard Light Water Reactor Cross-Section Libraries using the United States Nuclear Regulatory Commission Pressurized Water Reactor Standard Core Loading Benchmark Problem

    NASA Astrophysics Data System (ADS)

    Arzu Alpan, F.; Kulesza, Joel A.

    2016-02-01

    This paper compares contemporary and historical light water reactor shielding and pressure vessel dosimetry cross-section libraries for a pressurized water reactor calculational benchmark problem with a standard out-in core loading. The calculational benchmark problem was developed at Brookhaven National Laboratory by the request of the U. S. Nuclear Regulatory Commission and used the Oak Ridge National Laboratory two-dimensional discrete ordinates code DORT and the BUGLE-93 cross-section library for the calculations. In this paper, a Westinghouse three-dimensional discrete ordinates code with parallel processing, the RAPTOR-M3G code was used. A variety of cross section libraries were used with RAPTOR-M3G including the BUGLE-93, BUGLE-96, and BUGLE-B7 cross-section libraries developed at Oak Ridge National Laboratory, and the broad-group ALPAN-VII.0 cross-section library developed at Westinghouse. In comparing the calculation-to-calculation reaction rates using the BUGLE-93 cross-section library at the thermal shield, pressure vessel, and cavity capsules, for eleven dosimetry reaction rates, a maximum relative difference of 5% was observed, with the exception of 65Cu(n,2n) in the pressure vessel capsule that had a 90% relative difference with respect to the reference results. It is thought that the 65Cu(n,2n) reaction rate reported in the reference for the pressure vessel capsule is not correct. In considering the libraries developed after BUGLE-93, a maximum relative difference of 12% was observed in reaction rates, with respect to the reference results, for 237Np(n,f) in the cavity capsule using BUGLE-B7.

  3. 78 FR 33121 - Staff Requirements-SECY-12-0168-Calvert Cliffs 3 Nuclear Project, LLC & UniStar Nuclear Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Staff Requirements--SECY-12-0168--Calvert Cliffs 3 Nuclear Project, LLC & UniStar Nuclear.... On March 11, 2013, in SRM-12-0168, ``Calvert Cliffs 3 Nuclear Project, LLC & UniStar...

  4. 45 CFR 701.12 - Staff Director.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Staff Director. 701.12 Section 701.12 Public... FUNCTIONS OF THE COMMISSION Organization Statement § 701.12 Staff Director. A Staff Director for the... Director is the administrative head of the agency....

  5. 45 CFR 701.12 - Staff Director.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Staff Director. 701.12 Section 701.12 Public... FUNCTIONS OF THE COMMISSION Organization Statement § 701.12 Staff Director. A Staff Director for the... Director is the administrative head of the agency....

  6. 45 CFR 701.12 - Staff Director.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Staff Director. 701.12 Section 701.12 Public... FUNCTIONS OF THE COMMISSION Organization Statement § 701.12 Staff Director. A Staff Director for the... Director is the administrative head of the agency....

  7. 45 CFR 701.12 - Staff Director.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Staff Director. 701.12 Section 701.12 Public... FUNCTIONS OF THE COMMISSION Organization Statement § 701.12 Staff Director. A Staff Director for the... Director is the administrative head of the agency....

  8. 77 FR 33779 - Interim Staff Guidance JLD-ISG-2012-01; Compliance With Order EA-12-049, Order Modifying Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ...The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the draft Japan Lessons-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA- 12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.'' This draft JLD-ISG provides guidance and clarification to......

  9. U.S. Nuclear Regulatory Commission Review of U.S. Department of Energy Non-High Level Waste Determination for Idaho National Laboratory Tank Farm Facility

    SciTech Connect

    Barr, C.S.; Yin, X.; Camper, L.W.; Whited, A.R.; Dinwiddie, C.L.; Howard, L.D.; Pabalan, R.T.; Pickett, D.

    2007-07-01

    The National Defense Authorization Act for Fiscal Year 2005 (NDAA) authorized the United States Department of Energy (DOE) to determine whether certain radioactive waste related to the reprocessing of spent nuclear fuel is not high-level-waste (HLW). The NDAA applies to DOE facilities in the States of South Carolina and Idaho. DOE must consult with the United States Nuclear Regulatory Commission (NRC) as part of its waste determination. NRC must coordinate with the affected state to monitor DOE's disposal actions to assess compliance with 10 CFR 61, Subpart C, performance objectives. The performance objectives in 10 CFR Part 61, Subpart C, contain requirements for protection of the public, inadvertent intruders, individuals during operations, and stability of the disposal site after closure. In September 2005, DOE submitted to NRC a draft non-HLW determination for waste incidental to reprocessing, including sodium-bearing waste [note: Sodium-bearing waste is a generic term used to describe radioactive wastes comprised of second- and third-cycle extraction fluid and decontamination fluids. This waste contains less activity and generally poses less risk than first-cycle extraction fluid (first-cycle extraction fluid contains most of the fission products)] (SBW) stored in the Idaho Nuclear Technology and Engineering Center tank farm facility (INTEC TFF) at the Idaho National Laboratory (INL). DOE plans to grout the underground tanks and concrete vaults that house these tanks to stabilize the waste in situ. DOE prepared a waste determination to demonstrate compliance with NDAA criteria, including a supporting performance assessment to demonstrate compliance with the performance objectives. To carry out its consultative role required by the NDAA, NRC uses a risk-informed, performance-based approach in its review of DOE waste determinations and performance assessments to focus on the key natural and engineered system features needed to support its compliance

  10. Staff Caricatures

    ERIC Educational Resources Information Center

    Templeton, Kristine

    2010-01-01

    This article describes how the author brings staff and students together through an art project that deals with caricatures. The author started with a lesson on caricature, and she made a PowerPoint presentation showcasing the work of Al Hirschfeld. Using photos of the staff, students created portraits and hung them in a main hallway after school.…

  11. 76 FR 32878 - Draft Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-07

    ...; ] NUCLEAR REGULATORY COMMISSION 10 CFR Part 50 Draft Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Draft Regulatory Guide, DG-1253, ``Preoperational Testing of Emergency Core Cooling Systems for Pressurized-Water Reactors''....

  12. 75 FR 41241 - Draft Regulatory Guide; Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-15

    ... COMMISSION Draft Regulatory Guide; Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Issuance, availability of Draft Regulatory Guide (DG)-1234. ADDRESSES: You may submit comments by any one... and licenses. The draft regulatory guide, entitled, ``Water Sources for Long-Term...

  13. 75 FR 28073 - Draft Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Draft Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Draft Regulatory Guide, DG-3039, ``Standard Format and Content...

  14. 75 FR 48382 - Draft Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Draft Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Draft Regulatory Guide, DG-1228, ``Standard Format and Content...

  15. 76 FR 6086 - Draft Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-03

    ... COMMISSION 10 CFR Part 73 RIN 3150-AI49 Draft Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Availability of Draft Regulatory Guide. SUMMARY: The U.S. Nuclear Regulatory Commission (Commission or NRC) is issuing for public comment Draft Regulatory Guide,...

  16. 75 FR 36715 - Final Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... COMMISSION Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide, RG 1.62. FOR FURTHER INFORMATION CONTACT: Karl J... Regulatory Commission (NRC or Commission) is issuing a revision of a guide in the agency's ``Regulatory...

  17. Regulatory and technical reports (abstract index journal): Annual compilation for 1994. Volume 19, Number 4

    SciTech Connect

    1995-03-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order. These precede the following indexes: secondary report number index, personal author index, subject index, NRC originating organization index (staff reports), NRC originating organization index (international agreements), NRC contract sponsor index (contractor reports), contractor index, international organization index, and licensed facility index. A detailed explanation of the entries precedes each index.

  18. 78 FR 31614 - Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ... 2007 (ML070630003). On October 22, 2012 (77 FR 64564), the staff issued the proposed DC/COL-ISG-024... COMMISSION Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles AGENCY....221, ``Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants,'' in support of...

  19. Quality improvements in decreasing medication administration errors made by nursing staff in an academic medical center hospital: a trend analysis during the journey to Joint Commission International accreditation and in the post-accreditation era

    PubMed Central

    Wang, Hua-fen; Jin, Jing-fen; Feng, Xiu-qin; Huang, Xin; Zhu, Ling-ling; Zhao, Xiao-ying; Zhou, Quan

    2015-01-01

    Background Medication errors may occur during prescribing, transcribing, prescription auditing, preparing, dispensing, administration, and monitoring. Medication administration errors (MAEs) are those that actually reach patients and remain a threat to patient safety. The Joint Commission International (JCI) advocates medication error prevention, but experience in reducing MAEs during the period of before and after JCI accreditation has not been reported. Methods An intervention study, aimed at reducing MAEs in hospitalized patients, was performed in the Second Affiliated Hospital of Zhejiang University, Hangzhou, People’s Republic of China, during the journey to JCI accreditation and in the post-JCI accreditation era (first half-year of 2011 to first half-year of 2014). Comprehensive interventions included organizational, information technology, educational, and process optimization-based measures. Data mining was performed on MAEs derived from a compulsory electronic reporting system. Results The number of MAEs continuously decreased from 143 (first half-year of 2012) to 64 (first half-year of 2014), with a decrease in occurrence rate by 60.9% (0.338% versus 0.132%, P<0.05). The number of MAEs related to high-alert medications decreased from 32 (the second half-year of 2011) to 16 (the first half-year of 2014), with a decrease in occurrence rate by 57.9% (0.0787% versus 0.0331%, P<0.05). Omission was the top type of MAE during the first half-year of 2011 to the first half-year of 2014, with a decrease by 50% (40 cases versus 20 cases). Intravenous administration error was the top type of error regarding administration route, but it continuously decreased from 64 (first half-year of 2012) to 27 (first half-year of 2014). More experienced registered nurses made fewer medication errors. The number of MAEs in surgical wards was twice that in medicinal wards. Compared with non-intensive care units, the intensive care units exhibited higher occurrence rates of MAEs

  20. 10 CFR 110.91 - Commission consultations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Commission consultations. 110.91 Section 110.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Public Participation Procedures Concerning License Applications § 110.91 Commission consultations. The Commission...

  1. 10 CFR 2.806 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Commission action. 2.806 Section 2.806 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Rulemaking § 2.806 Commission action. The Commission will incorporate in the notice of adoption of a regulation...

  2. 76 FR 63325 - National Indian Gaming Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... Register on November 18, 2010. 75 FR 70680. The Commission's regulatory review process established a tribal... National Indian Gaming Commission AGENCY: National Indian Gaming Commission. ACTION: Notice of no action. SUMMARY: On November 18, 2010, the National Indian Gaming Commission (NIGC) issued a Notice of Inquiry...

  3. 77 FR 15818 - License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ...The U.S. Nuclear Regulatory Commission (NRC) is issuing the final License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience.'' This LR-ISG provides guidance and clarification concerning ongoing reviews of plant-specific and industry-wide operating experience as an attribute of aging management programs used at nuclear power plants as described in......

  4. 25 CFR 518.10 - What must a self-regulating tribe provide the Commission to maintain its self-regulatory status?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... COMMISSION, DEPARTMENT OF THE INTERIOR GENERAL PROVISIONS SELF-REGULATION OF CLASS II GAMING § 518.10 What... that holds a certificate of self-regulation shall be required to submit the following information by April 15 of each year following the first year of self-regulation, or within 120 days after the end...

  5. Authority of states of use section 401 water quality certification to deny or condition Federal Energy Regulatory Commission licenses. Master's thesis

    SciTech Connect

    Hart, E.O.

    1994-09-01

    This thesis discusses a recent United States Supreme Court case that will have a profound influence on the licensure of hydroelectric projects and the related ability of States to protect the quality of their waters. On October 4, 1993, the Supreme Court granted a Writ of Certiorari to resolve a conflict among the state courts of last resort. This case involves two fundamental and competing national interests: the nation's thirst for cheap, dependable power versus its equally strong desire to improve the quality of its water resources. It also involves two underlying regulatory regimes that overlap and conflict with each other in some ways. This case illustrates how those two national interests and their underlying regulatory regimes cannot always be reconciled. It also demonstrates how Congress, with its muddled ways of passing legislation, can create conflicts between federal and state regulatory agencies.

  6. English for Airport Ground Staff

    ERIC Educational Resources Information Center

    Cutting, Joan

    2012-01-01

    This article describes part of a European Commission Leonardo project that aimed to design a multimedia course for English language learners seeking work as ground staff in European airports. The structural-functional analysis of the dialogues written from the course showed that, across the four trades explored (security guards, ground handlers,…

  7. Staff Development.

    ERIC Educational Resources Information Center

    Reusswig, James, Ed.; Ponzio, Richard, Ed.

    1980-01-01

    Eight essays are presented which reflect current problems, issues, and practices related to the development of teacher and administrator expertise. The authors are school district and public school administrators, faculty of schools of education, and a director of staff development in a state department of education. The topics treated are: (1)…

  8. NRC regulatory agenda

    SciTech Connect

    Not Available

    1991-04-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action or has proposed, or is considering action and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  9. NRC regulatory agenda

    SciTech Connect

    Not Available

    1992-05-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  10. NRC Regulatory Agenda

    SciTech Connect

    Not Available

    1991-10-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  11. NRC Regulatory Agenda

    SciTech Connect

    Not Available

    1991-08-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action or has proposed, or is considering action and all petitions for rulemaking which have been received by the commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  12. NRC regulatory agenda

    SciTech Connect

    Not Available

    1993-04-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  13. NRC regulatory agenda

    SciTech Connect

    Not Available

    1990-07-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has proposed or is considering action and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  14. 39 CFR 3002.10 - The Commission and its offices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false The Commission and its offices. 3002.10 Section 3002.10 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION § 3002.10 The Commission and its offices. (a) The Commissioners. The Postal Regulatory Commission is an independent...

  15. 39 CFR 3002.10 - The Commission and its offices.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false The Commission and its offices. 3002.10 Section 3002.10 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION § 3002.10 The Commission and its offices. (a) The Commissioners. The Postal Regulatory Commission is an independent...

  16. 39 CFR 3002.10 - The Commission and its offices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false The Commission and its offices. 3002.10 Section 3002.10 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION § 3002.10 The Commission and its offices. (a) The Commissioners. The Postal Regulatory Commission is an independent...

  17. 39 CFR 3002.10 - The Commission and its offices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false The Commission and its offices. 3002.10 Section 3002.10 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION § 3002.10 The Commission and its offices. (a) The Commissioners. The Postal Regulatory Commission is an independent...

  18. 39 CFR 3002.10 - The Commission and its offices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false The Commission and its offices. 3002.10 Section 3002.10 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION § 3002.10 The Commission and its offices. (a) The Commissioners. The Postal Regulatory Commission is an independent...

  19. 77 FR 47630 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Working Group and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... Working Group and Stakeholder Meeting The Federal Energy Regulatory Commission (Commission) hereby gives... Commission's ongoing outreach efforts. Entergy Regional State Committee Working Group and Stakeholder...

  20. 77 FR 21979 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Working Group and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-12

    ... Working Group and Stakeholder Meeting The Federal Energy Regulatory Commission (Commission) hereby gives... Commission's ongoing outreach efforts. Entergy Regional State Committee Working Group and Stakeholder...

  1. 76 FR 66920 - Commission Information Collection Activities (FERC-549); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities (FERC-549); Comment Request; Submitted for OMB Review AGENCY: Federal Energy Regulatory Commission. ACTION: Notice. SUMMARY:...

  2. 78 FR 26766 - Commission Information Collection Activities (FERC Form 580); Comment Request; Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities (FERC Form 580); Comment Request; Revision AGENCY: Federal Energy Regulatory Commission. ACTION: Notice of information...

  3. 19 CFR 207.64 - Staff reports.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Staff reports. 207.64 Section 207.64 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF... supplement and correct the information contained in the prehearing staff report. The Director shall place...

  4. Commissioning MMS

    NASA Technical Reports Server (NTRS)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  5. 76 FR 2725 - Draft Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Draft Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Issuance, Availability of Draft Regulatory Guide (DG)-1245. FOR FURTHER INFORMATION CONTACT: Mark P. Orr, U.S. Nuclear Regulatory Commission,...

  6. 76 FR 16017 - Withdrawal of Regulatory Guide 8.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... COMMISSION Withdrawal of Regulatory Guide 8.5 AGENCY: Nuclear Regulatory Commission. ACTION: Withdrawal of Regulatory Guide 8.5, ``Criticality and Other Interior Evacuation Signals.'' FOR FURTHER INFORMATION CONTACT... The U.S. Nuclear Regulatory Commission (NRC) is withdrawing Regulatory Guide 8.5, ``Criticality...

  7. 75 FR 20645 - Draft Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... COMMISSION Draft Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Draft Regulatory Guide, DG-4018. FOR FURTHER INFORMATION CONTACT... Regulatory Commission (NRC) is issuing for public comment a draft guide in the agency's ``Regulatory...

  8. 76 FR 27924 - Draft Regulatory Guide, Guidance for ITAAC Closure

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... COMMISSION 10 CFR Parts 2 and 52 RIN 3150-AI77 Draft Regulatory Guide, Guidance for ITAAC Closure AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for comment. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment Draft Regulatory Guide...

  9. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 2. Evaluation of seismic designs: a review of seismic design requirements for Nuclear Power Plant Piping

    SciTech Connect

    Not Available

    1985-04-01

    This document reports the position and recommendations of the NRC Piping Review Committee, Task Group on Seismic Design. The Task Group considered overlapping conservation in the various steps of seismic design, the effects of using two levels of earthquake as a design criterion, and current industry practices. Issues such as damping values, spectra modification, multiple response spectra methods, nozzle and support design, design margins, inelastic piping response, and the use of snubbers are addressed. Effects of current regulatory requirements for piping design are evaluated, and recommendations for immediate licensing action, changes in existing requirements, and research programs are presented. Additional background information and suggestions given by consultants are also presented.

  10. Arizona Commission of Indian Affairs 1986-87 Annual Report.

    ERIC Educational Resources Information Center

    Arizona Commission of Indian Affairs, Phoenix.

    This annual report includes a list of commission membership and staff; a map of state Indian reservations; a table of reservation acreages and populations; a list of commission meetings and those in attendance; a list of 1986-87 commission publications and an agency financial report. A section of "commission highlights" summarizes nine issues…

  11. 10 CFR 110.40 - Commission review.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Commission review. 110.40 Section 110.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Review of License Applications § 110.40 Commission review. (a) Immediately after receipt of a license application for an...

  12. 10 CFR 2.1331 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Commission action. 2.1331 Section 2.1331 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2.1331 Commission action. (a) Upon completion of...

  13. 39 CFR 3060.42 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Commission review. 3060.42 Section 3060.42 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ACCOUNTING PRACTICES AND TAX RULES FOR THE THEORETICAL COMPETITIVE PRODUCTS ENTERPRISE § 3060.42 Commission review. (a) Interested persons shall be provided...

  14. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86...

  15. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86...

  16. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86...

  17. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86...

  18. 19 CFR 207.22 - Prehearing and final staff reports.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Prehearing and final staff reports. 207.22 Section 207.22 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS... version of the staff report. The final staff report is intended to supplement and correct the...

  19. 19 CFR 207.22 - Prehearing and final staff reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Prehearing and final staff reports. 207.22 Section 207.22 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS... version of the staff report. The final staff report is intended to supplement and correct the...

  20. Summary of comments received on staff draft proposed rule on radiological criteria for decommissioning

    SciTech Connect

    Caplin, J.; Page, G.; Smith, D.; Wiblin, C.

    1994-08-01

    The Nuclear Regulatory Commission (NRC) is conducting an enhanced participatory rulemaking to establish radiological criteria for the decommissioning of NRC licensed facilities. The NRC obtained comments on the scope, issues, and approaches through a series of workshops (57 FR 58727), Generic Environmental Impact Statement (GEIS) scoping meetings (58 FR 33570), a dedicated electronic bulletin board system (58 FR 37760), and written submissions. A summary of workshop and scope-meeting comments was published as NUREG/CR-6156. On February 2, 1994, the Commission published in the Federal Register (59 FR 4868) a notice that the NRC staff had prepared a ``staff draft`` proposed rule on radiological criteria for decommissioning. Copies of the staff draft were distributed to the Agreement States, participants in the earlier meetings, and other interested parties for comment. This report summarizes the comments identified from the 96 docketed letters received on the staff draft. No analysis or response is included in this report. The comments reflect a broad spectrum of viewpoints. Two subjects on which the commenters were in general agreement were (1) that the enhanced participatory rulemaking should proceed, and (2) that the forthcoming GEIS and guidance documents are needed for better understanding of the draft rule.

  1. 76 FR 18262 - Notice of issuance of Regulatory Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... COMMISSION Notice of issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.44, Revision 1, ``Control of the Processing and Use of... Commission (NRC) is issuing a revision to an existing guide in the agency's ``Regulatory Guide'' series....

  2. 75 FR 27599 - Notice of Issuance of Regulatory Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... COMMISSION Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance and availability of Regulatory Guide 6.7, Revision 2, ``Preparation of an Environmental Report To... The U.S. Nuclear Regulatory Commission (NRC) is issuing a revision to an existing guide in the...

  3. 75 FR 62436 - Notice of Issuance of Regulatory Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-08

    ... COMMISSION Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.54, Revision 2, ``Service Level I, II, and III Protective.... Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing a revision to an existing guide in...

  4. 75 FR 42170 - Final Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-20

    ... COMMISSION Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide, RG 8.40, ``Methods for Measuring Effective Dose... . SUPPLEMENTARY INFORMATION: I. Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing a new...

  5. 76 FR 38213 - Notice of Issuance of Regulatory Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... COMMISSION Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Revision 2 of Regulatory Guide 1.107, ``Qualification for Cement Grouting for... or Commission) is issuing a revision to an existing guide in the agency's ``Regulatory Guide''...

  6. S. 946: A Bill to reorganize the functions of the Nuclear Regulatory Commission to promote more effective regulation of atomic energy for peaceful purposes. Introduced in the Senate of the United States, One Hundredth First Congress, First Session, May 9, 1989

    SciTech Connect

    Not Available

    1989-01-01

    S. 946 is a bill to reorganize the functions of the Nuclear Regulatory Commission to promote more effective regulation of atomic energy for peaceful purposes. The Bill proposes the reorganization of the NRC activities under the structure and functions of a Nuclear Safety Agency.

  7. NRC regulatory agenda

    SciTech Connect

    Not Available

    1993-02-01

    This document is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considered action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  8. NRC regulatory agenda

    SciTech Connect

    Not Available

    1992-11-01

    This document provides a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  9. NRC Regulatory Agenda

    SciTech Connect

    Not Available

    1992-07-01

    This document compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rule making which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  10. 10 CFR 62.25 - Criteria for a Commission determination.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Criteria for a Commission determination. 62.25 Section 62.25 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CRITERIA AND PROCEDURES FOR EMERGENCY ACCESS TO NON-FEDERAL AND REGIONAL LOW-LEVEL WASTE DISPOSAL FACILITIES Issuance of a Commission Determination § 62.25 Criteria for a Commission determination....

  11. 75 FR 39069 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... COMMISSION Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of.... \\1\\ 15 U.S.C. 78s(b)(1). \\2\\ 17 CFR 240.19b-4. I. Self-Regulatory Organization's Statement of the... FINRA and at the Commission's Public Reference Room. II. Self-Regulatory Organization's Statement of...

  12. 77 FR 74712 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-17

    ... COMMISSION Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving Proposed Rule Change To Amend the Customer and Industry Codes of Arbitration Procedure Relating to... Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange...

  13. 47 CFR 0.5 - General description of Commission organization and operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false General description of Commission organization and operations. 0.5 Section 0.5 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.5 General description of Commission organization and operations. (a) Principal staff units. The Commission...

  14. 17 CFR 146.9 - Appeals to the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and Sunshine Acts compliance staff, Office of the Secretariat, Commodity Futures Trading Commission..., Office of the Secretariat of the petition, unless for good cause shown, the Commission extends the 30-day..., Office of the Secretariat a concise statement setting forth why he disagrees with the Commission's...

  15. 76 FR 79670 - Historic Harrisville, Inc.; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Historic Harrisville, Inc.; Notice of Application Tendered for Filing With...: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington,...

  16. 76 FR 40150 - Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... in the Federal Register on December 28, 2010. Timetable: Action Date FR Cite Staff Sent Draft ANPRM... 11/25/08 73 FR 71570 Register. ANPRM Comment Period End 01/26/09 Staff Sends Briefing Package to 06/30/10 Commission. Commission Decision 07/14/10 NPRM 07/23/10 75 FR 43308 NPRM Comment Period End...

  17. U.S. Nuclear Regulatory Commission

    MedlinePlus

    ... Copies of Documents FOIA & Privacy Act Photos & Video Records Management Withholding of Sensitive Information FAQ Index Electronic Hearing ... Lessons Learned Seabrook Concrete Degradation NRC Safety Culture Policy Statement ... Spotlight Archive » News & Speeches September 12, 2016 Nuclear ...

  18. NRC (Nuclear Regulatory Commission) editorial style guide

    SciTech Connect

    Beeson, J.F.; Calure, B.A.; Gable, D.; Lesar, M.T.; Mejac, M.F.; Sanders, R.F.

    1989-10-01

    Editorial style refers to the choices that writers, editors, and secretaries make to eliminate inconsistencies in their documents. These choices apply to the recurrent features of a document such as abbreviations, capitalization, compound words, numbers, symbols, and punctuation, as well as to references and footnotes. Making these choices is sometimes difficult because usage changes as the language evolves. Consider the use of hyphens, for example. Do we write non-power reactor or nonpower reactor Is it on-site incident or onsite incident Although usage is moving away from the use of hyphens with prefixes, the authorities who compile style guides do not always agree about which choice to use at a given time. Moreover, each discipline -- law, physics, mathematics -- has specific standards that apply to the publications for that discipline. Even in an area as seemingly certain as spelling, overlapping usage exists. Reputable dictionaries show both align'' and aline'' as correct spellings. Likewise, disc, disk, and diskette'' currently coexist as equally valid choices.

  19. Federal Communications Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... Independent Panel Reviewing the Impact of Hurricane Katrina on 3060-AI78 Communications Networks 560 Stolen... 588 Telecommunications Carriers' Use of Customer Proprietary Network Information and Other 3060-AG43... of 3060-AG50 1996 590 Local Telephone Networks That LECs Must Make Available to Competitors...

  20. Federal Communications Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... 3060-AI78 Communications Networks 366 Stolen Vehicle Recovery System (SVRS) 3060-AJ01 367 Commercial...... 3060-AF85 397 Telecommunications Carriers' Use of Customer Proprietary Network Information and Other... Telecommunications Act of 3060-AG50 1996 399 Local Telephone Networks That LECs Must Make Available to...