Science.gov

Sample records for resource planning systems

  1. Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Wilson, Charmaine V.

    2012-01-01

    Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…

  2. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    SciTech Connect

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  3. From Training to Learning in Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Kerr, Don; Murray, Peter A.; Burgess, Kevin

    2012-01-01

    The information systems' literature outlines how training is a critical factor to successful Enterprise Resource Planning (ERP) implementations. Yet, types of training are not discussed in the literature and there is little indication if existing training is effective and whether relevant contextual factors have been considered. Without…

  4. Systems Dynamic ToolBox for Water Resource Planning

    Energy Science and Technology Software Center (ESTSC)

    2006-08-01

    The Fully Integrated System Dynamics Tookbox for Water Resources Planning (Toolbox) is a library of generic modules intended to assist in water management planning and decision making in watersheds around the world. The modules - built in a commercially available modeling environment called Powersim Studio Expert, represent the different sub-systems ina watershed, including population, agriculture, economics, climate, reservoirs, stream flows, and fish populations, and provides generic building blocks with which complex models of complex modelsmore » of complex watersheds can be assembled. The resulting models provide a tool for observing how research management decision made in one sector of a basin can affect other sectors. Improved water resource management contributes to improved public health, economic development, ecological sustainability, and overall security and stability.« less

  5. ERP (enterprise resource planning) systems can streamline healthcare business functions.

    PubMed

    Jenkins, E K; Christenson, E

    2001-05-01

    Enterprise resource planning (ERP) software applications are designed to facilitate the systemwide integration of complex processes and functions across a large enterprise consisting of many internal and external constituents. Although most currently available ERP applications generally are tailored to the needs of the manufacturing industry, many large healthcare systems are investigating these applications. Due to the significant differences between manufacturing and patient care, ERP-based systems do not easily translate to the healthcare setting. In particular, the lack of clinical standardization impedes the use of ERP systems for clinical integration. Nonetheless, an ERP-based system can help a healthcare organization integrate many functions, including patient scheduling, human resources management, workload forecasting, and management of workflow, that are not directly dependent on clinical decision making. PMID:11351810

  6. Integrated system dynamics toolbox for water resources planning.

    SciTech Connect

    Reno, Marissa Devan; Passell, Howard David; Malczynski, Leonard A.; Peplinski, William J.; Tidwell, Vincent Carroll; Coursey, Don (University of Chicago, Chicago, IL); Hanson, Jason (University of New Mexico, Albuquerque, NM); Grimsrud, Kristine (University of New Mexico, Albuquerque, NM); Thacher, Jennifer (University of New Mexico, Albuquerque, NM); Broadbent, Craig (University of New Mexico, Albuquerque, NM); Brookshire, David; Chemak, Janie; Cockerill, Kristan; Aragon, Carlos , Socorro, NM); Hallett, Heather (New Mexico Univeristy of Technology and Mining , Socorro, NM); Vivoni, Enrique (New Mexico Univeristy of Technology and Mining , Socorro, NM); Roach, Jesse

    2006-12-01

    Public mediated resource planning is quickly becoming the norm rather than the exception. Unfortunately, supporting tools are lacking that interactively engage the public in the decision-making process and integrate over the myriad values that influence water policy. In the pages of this report we document the first steps toward developing a specialized decision framework to meet this need; specifically, a modular and generic resource-planning ''toolbox''. The technical challenge lies in the integration of the disparate systems of hydrology, ecology, climate, demographics, economics, policy and law, each of which influence the supply and demand for water. Specifically, these systems, their associated processes, and most importantly the constitutive relations that link them must be identified, abstracted, and quantified. For this reason, the toolbox forms a collection of process modules and constitutive relations that the analyst can ''swap'' in and out to model the physical and social systems unique to their problem. This toolbox with all of its modules is developed within the common computational platform of system dynamics linked to a Geographical Information System (GIS). Development of this resource-planning toolbox represents an important foundational element of the proposed interagency center for Computer Aided Dispute Resolution (CADRe). The Center's mission is to manage water conflict through the application of computer-aided collaborative decision-making methods. The Center will promote the use of decision-support technologies within collaborative stakeholder processes to help stakeholders find common ground and create mutually beneficial water management solutions. The Center will also serve to develop new methods and technologies to help federal, state and local water managers find innovative and balanced solutions to the nation's most vexing water problems. The toolbox is an important step toward achieving the technology development goals of this center.

  7. Distributed autonomous systems: resource management, planning, and control algorithms

    NASA Astrophysics Data System (ADS)

    Smith, James F., III; Nguyen, ThanhVu H.

    2005-05-01

    Distributed autonomous systems, i.e., systems that have separated distributed components, each of which, exhibit some degree of autonomy are increasingly providing solutions to naval and other DoD problems. Recently developed control, planning and resource allocation algorithms for two types of distributed autonomous systems will be discussed. The first distributed autonomous system (DAS) to be discussed consists of a collection of unmanned aerial vehicles (UAVs) that are under fuzzy logic control. The UAVs fly and conduct meteorological sampling in a coordinated fashion determined by their fuzzy logic controllers to determine the atmospheric index of refraction. Once in flight no human intervention is required. A fuzzy planning algorithm determines the optimal trajectory, sampling rate and pattern for the UAVs and an interferometer platform while taking into account risk, reliability, priority for sampling in certain regions, fuel limitations, mission cost, and related uncertainties. The real-time fuzzy control algorithm running on each UAV will give the UAV limited autonomy allowing it to change course immediately without consulting with any commander, request other UAVs to help it, alter its sampling pattern and rate when observing interesting phenomena, or to terminate the mission and return to base. The algorithms developed will be compared to a resource manager (RM) developed for another DAS problem related to electronic attack (EA). This RM is based on fuzzy logic and optimized by evolutionary algorithms. It allows a group of dissimilar platforms to use EA resources distributed throughout the group. For both DAS types significant theoretical and simulation results will be presented.

  8. The annual human resource review (a career-planning system).

    PubMed

    Vosburgh, R M

    1980-10-01

    The success of an organization depends, to some extent, on a satisfied, challenged workforce. Career planning is a key element in personnel's efforts to reach this goal, and in this article, Vosburgh presents a strategy for developing a career-planning system which takes account of the individual employee's needs within the corporate structure. PMID:10248748

  9. Exploring the Factors of an Enterprise Resource Planning System in a Local Government Organization

    ERIC Educational Resources Information Center

    Shaw, Bryan T.

    2012-01-01

    The enterprise resource planning (ERP) system industry accounts for $8.8 billion annually. Enterprise resource planning systems are not performing as expected due to implementation barriers, changes in job responsibilities, and access to information; 50% of all information technology failures are due to the implementation of ERP systems. Guided by…

  10. Comparing Public and Private Institutions That Have and Have Not Implemented Enterprise Resource Planning (ERP) Systems: A Resource Dependence Perspective

    ERIC Educational Resources Information Center

    Sendhil, Geetha R.

    2012-01-01

    The purpose of this national study was to utilize quantitative methods to examine institutional characteristics, financial resource variables, personnel variables, and customer variables of public and private institutions that have and have not implemented enterprise resource planning (ERP) systems, from a resource dependence perspective.…

  11. Human Resource Planning

    ERIC Educational Resources Information Center

    Hoffman, W. H.; Wyatt, L. L.

    1977-01-01

    By using the total resource approach, we have focused attention on the need to integrate human resource planning with other business plans and highlighted the importance of a productivity strategy. (Author)

  12. Planning Resource Guide.

    ERIC Educational Resources Information Center

    RP Group of California Community Colleges, Santa Ana.

    The Planning Resource Guide by the RP Group of California Community Colleges was created to provide practical planning assistance. It contains four sections, including: (1) a basic conceptual framework for planning; (2) common planning definitions for colleges; (3) planning steps and samples of planning structures; and (4) suggestions for linking…

  13. Post-Implementation Success Factors for Enterprise Resource Planning Student Administration Systems in Higher Education Institutions

    ERIC Educational Resources Information Center

    Sullivan, Linda; Bozeman, William

    2010-01-01

    Enterprise Resource Planning (ERP) systems can represent one of the largest investments of human and financial resources by a higher education institution. They also bring a significant process reengineering aspect to the institution and the associated implementation project through the integration of compiled industry best practices into the…

  14. Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms

    ERIC Educational Resources Information Center

    Zeng, Yajun

    2010-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…

  15. Measuring Business Process Learning with Enterprise Resource Planning Systems to Improve the Value of Education

    ERIC Educational Resources Information Center

    Monk, Ellen F.; Lycett, Mark

    2016-01-01

    Enterprise Resource Planning Systems (ERP) are very large and complex software packages that run every aspect of an organization. Increasingly, ERP systems are being used in higher education as one way to teach business processes, essential knowledge for students competing in today's business environment. Past research attempting to measure…

  16. Enterprise Resource Planning Systems: Assessment of Risk Factors by California Community College Leaders

    ERIC Educational Resources Information Center

    Valente, Mario Manuel

    2011-01-01

    Most California Community Colleges have chosen to purchase and implement a Management Information Systems software solution also known as an Enterprise Resource Planning (ERP) system in order to monitor, control, and automate their administrative tasks. ERP implementations are complex, expensive, high profile, and therefore high risk. To reduce…

  17. The influence of enterprise resource planning (ERP) systems' performance on earnings management

    NASA Astrophysics Data System (ADS)

    Tsai, Wen-Hsien; Lee, Kuen-Chang; Liu, Jau-Yang; Lin, Sin-Jin; Chou, Yu-Wei

    2012-11-01

    We analyse whether there is a linkage between performance measures of enterprise resource planning (ERP) systems and earnings management. We find that earnings management decreases with the higher performance of ERP systems. The empirical result is as expected. We further analyse how the dimension of the DeLone and McLean model of information systems success affects earnings management. We find that the relationship between the performance of ERP systems and earnings management depends on System Quality after ERP implementation. The more System Quality improves, the more earnings management is reduced.

  18. Robust Decision Making and Info-Gap Decision Theory for water resource system planning

    NASA Astrophysics Data System (ADS)

    Matrosov, Evgenii S.; Woods, Ashley M.; Harou, Julien J.

    2013-06-01

    Stationarity assumptions of linked human-water systems are frequently invalid given the difficult-to-predict changes affecting such systems. In this case water planning occurs under conditions of deep or severe uncertainty, where the statistical distributions of future conditions and events are poorly known. In such situations predictive system simulation models are typically run under different scenarios to evaluate the performance of future plans under different conditions. Given that there are many possible plans and many possible futures, which simulations will lead to the best designs? Robust Decision Making (RDM) and Info-Gap Decision Theory (IGDT) provide a structured approach to planning complex systems under such uncertainty. Both RDM and IGDT make repeated use of trusted simulation models to evaluate different plans under different future conditions. Both methods seek to identify robust rather than optimal decisions, where a robust decision works satisfactorily over a broad range of possible futures. IGDT efficiently charts system performance with robustness and opportuneness plots summarising system performance for different plans under the most dire and favourable sets of future conditions. RDM samples a wider range of dire, benign and opportune futures and offers a holistic assessment of the performance of different options. RDM also identifies through ‘scenario discovery' which combinations of uncertain future stresses lead to system vulnerabilities. In our study we apply both frameworks to a water resource system planning problem: London's water supply system expansion in the Thames basin, UK. The methods help identify which out of 20 proposed water supply infrastructure portfolios is the most robust given severely uncertain future hydrological inflows, water demands and energy prices. Multiple criteria of system performance are considered: service reliability, storage susceptibility, capital and operating cost, energy use and environmental flows

  19. Planning for Water Resources of South Florida: A system dynamics modeling approach

    NASA Astrophysics Data System (ADS)

    Ahmad, S.

    2006-12-01

    With enormous growth in population, changes in land use, substantial agriculture activity, and need to protect vital environmental resources such as Everglades, south Florida presents a very challenging case for water resources planning. Working with stakeholders to meet challenges of water resources planning in south Florida, we are exploring important questions: (a) What are some major changes in terms of population growth, land use, water demand, and water availability that can be expected in south Florida in the short and long term?; (b) What would be the major hydrologic effects of climate variability and change on south Florida's water system?; (c) How could Florida's water system adapt to anticipated population growth, urban sprawl, and climate change?; and (d) What are the most promising (cost effective) policies for south Florida's water management in response to growth and climate change? We are developing a decision support (DS) framework, using system dynamics modeling approach, to evaluate and compare different short and long term water management policies. Besides climate information, the integrated DS framework considers other major factors that influence water demand and availability including: demographic changes, land use changes, economy, and environment. We analyze how increased or better use of climate information can lead to better, more cost-effective decisions for sustainable management of water resources. Using games/scenarios involving decision makers, we evaluate cost-effectiveness of different policy choices for short and long term water management in the region. We evaluate policies based on both demand side management through efficiency and conservation (low flow appliances, xeriscaping, pricing) and supply side management (desalination, water reuse). The outcome is a framework for exploring cost-effectiveness of alternative water management policies. The research advances work on water resources planning considering the impacts of

  20. Building a functional, integrated GIS/remote sensing resource analysis and planning system. [Utah

    NASA Technical Reports Server (NTRS)

    Ridd, M. K.; Wheeler, D. J.

    1985-01-01

    To be an effective tool for resource analysis and planning, a geographic information system (GIS) needs to be integrated with a digital remote sensing capability. To be truly functional, the paired system must be driven by grass roots local needs. A case study couched in a Soil Conservation District in northern Utah is presented. Agency representatives determined that the most fundamental data sets to be entered into the GIS system analysis system in the first round were: land use/land cover; geomorphic/soil unit data; hydrologic unit data; and digital terrain. The least expensive and best ways to obtain these data were determined. Data were acquired and formatted to enter the state's PRIME/ARC-INFO GIS, and are being interrogated for resource management decisions related to such issues as agricultural preservation, urban expansion, soil erosion control, and dam siting.

  1. SNL/CA Cultural Resources Management Plan.

    SciTech Connect

    Larsen, Barbara L.

    2005-11-01

    The SNL/CA Cultural Resources Management Plan satisfies the site's Environmental Management System requirement to promote long-term stewardship of cultural resources. The plan summarizes the cultural and historical setting of the site, identifies existing procedures and processes that support protection and preservation of resources, and outlines actions that would be initiated if cultural resources were discovered onsite in the future.3

  2. AQUATOOL, a generalized decision-support system for water-resources planning and operational management

    NASA Astrophysics Data System (ADS)

    Andreu, J.; Capilla, J.; Sanchís, E.

    1996-04-01

    This paper describes a generic decision-support system (DSS) which was originally designed for the planning stage of dicision-making associated with complex river basins. Subsequently, it was expanded to incorporate modules relating to the operational stage of decision-making. Computer-assisted design modules allow any complex water-resource system to be represented in graphical form, giving access to geographically referenced databases and knowledge bases. The modelling capability includes basin simulation and optimization modules, an aquifer flow modelling module and two modules for risk assessment. The Segura and Tagus river basins have been used as case studies in the development and validation phases. The value of this DSS is demonstrated by the fact that both River Basin Agencies currently use a version for the efficient management of their water resources.

  3. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    NASA Astrophysics Data System (ADS)

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  4. Planning and Resource Management in an Intelligent Automated Power Management System

    NASA Technical Reports Server (NTRS)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  5. Development of a decision support system for integrated water resource planning in small watersheds

    NASA Astrophysics Data System (ADS)

    Schröter, K.

    2003-04-01

    The implementation of the European Water Framework Directive inaugurates river basin management plans as the basis of integrated water resources planning. This includes the elaboration of programmes of measures which have to balance socio-economic and ecologic needs. So far, a multitude of approved and innovative water management measures are available. However, predications of the effects of these measures within a catchment area are difficult because the interrelations of physical processes are highly complex. In order to examine the effects of conceivable measures computer based simulation models have become an accepted instrument. Nevertheless, well-founded support for decision makers in water management practice facing multiobjective problems is lacking. The research project "Improved approaches for water resources management in intensively used small watersheds on the basis of integrated benefit and risk assessment (WSM300)" sponsored by the Deutsche Bundesstiftung Umwelt (DBU) focuses on the development of a generic Decision Support System (DSS) for measure planning in small watersheds. It addresses decision makers in water resources management practice. Main functional components of the DSS are a set of computer-based simulation models, multicriterial assessment procedures and features for the presentation of results. The work includes the development of concepts for the linkage of existing computer simulation models considering definitions of interfaces, enhancements of models and scaling problems. Further on, methods for the aggregation of modelled parameters to objective-values as a basis for multicriterial assessment procedures are elaborated. Data-management and presentation of results will be realised in a GIS-environment. Three case studies are carried out on the one hand in order to test the theoretical concepts and software developments on the other hand to include feedback from planning-practicioners.

  6. Technical and organisational aspects in enterprise resource planning systems implementation: lessons from a Spanish public hospital

    NASA Astrophysics Data System (ADS)

    Escobar-Rodriguez, Tomas; Escobar-Pérez, Bernabe; Monge-Lozano, Pedro

    2014-09-01

    Public resources should always be managed efficiently, more so in times of crisis. Due to the specific characteristics of the healthcare sector, there is a need for special attention, especially in regards to hospitals. Administrators need useful tools to be able to efficiently manage available resources, such as enterprise resource planning (ERP) systems. Therefore, an analysis of the effects of their implementation and use in hospitals is valuable. This study has two purposes. One is to analyse the role ERP systems play in aiding the integration of hospital data, with focus on user satisfaction as well as possible resistance to change. The other purpose is to analyse the effects of implanting and using ERP systems in the hospital environment and identifying how certain variables influence the process, especially the existence of different organisational cultures. Results indicate that clinical information has become notably more integrated, despite the lack of flow in the economic-financial area. The heterogeneous nature of the different groups, clinical (Medical, Nursing) and non-clinical (Economic-Financial, Accounting), had a negative influence on the implementation process, and limited the integration of information as well as the system's performance.

  7. Remote sensing and GIS based information system for sustainable resources planning at Panchayat level

    NASA Astrophysics Data System (ADS)

    Velmurugan, A.; Bhatt, S.; Dadhwal, V. K.

    2006-12-01

    Spatial databases of natural resources are very much essential to ensure enhanced productivity by conserving soil and water and to maintain ecological integrity of any region. Integration of various thematic layers prepared from high resolution data and detailed field survey would be preferred for grass root level planning (Panchayat) aimed to realize the potential of production system on a sustained basis. In this study, a detailed spatial data base was created for part of Kasaragod dist., Kerala, India. Detailed soil survey was carried out using cadastral map and registered over high resolution satellite data (IRS LISS-IV) which helped to identify problems and potentials of the area. Nearly 600 ha of land were found to be at higher erosion risk category out of ten soil series identified in the study area. Remote sensing data was used to prepare land use/land cover map and coconut (53%) followed by mixed vegetation type (16%) were found to be dominant. Soil site suitability assessment for major crops of the area was carried out and crossed with present land use to get the mismatch in land use/land utilization type. Alternate land use plan was prepared considering the potentials and problems of various available resources. Decision Support System (DSS) along with user interface is developed to support decision and extract relevant information. As organic carbon is one of the most important indicators of soil fertility C stock in the present and proposed land use was also estimated to understand the environmental significance.

  8. The Nature of Effective Human Resource Planning.

    ERIC Educational Resources Information Center

    Don, Daniel; Kleiner, Brian H.

    1991-01-01

    The general structure of the human resource planning function in organizations and the responsibilities at each level of management are discussed. A framework for constructing and implementing a human resource planning system is outlined, and several approaches for human resource forecasting are examined. (MSE)

  9. Risk Analysis for Resource Planning Optimization

    NASA Technical Reports Server (NTRS)

    Cheung, Kar-Ming

    2008-01-01

    This paper describes a systems engineering approach to resource planning by integrating mathematical modeling and constrained optimization, empirical simulation, and theoretical analysis techniques to generate an optimal task plan in the presence of uncertainties.

  10. Planning and Design of Water Resources Systems Under Climate Change and Variability

    NASA Astrophysics Data System (ADS)

    Strzepek, K. M.

    2014-12-01

    Regional and local water supplies and demands are impacted by global and national systems: climate, economics, population and energy as well as policies: development, energy, and environmental. These drivers can result in complex interactions that require deeper understanding in order to provide actionable information for water planners and stakeholders to develop strategic plans in the face of a changing and growing world. To add more complexity to this issue is the fact that all these drivers are uncertain and the type of uncertainty is not the same. This talk will address approaches to Water Resource Planning at sub-national water regions, national levels and trans-boundary river basins under a non-stationary hydro-climatic future. Additionally the talk will address the design of specific water resource projects such as reservoirs and hydroplants that are being designed now but will operate far in the future when the hydro-climatology will be very different. Examples will be drawn from recent work in Africa, Eastern Europe and Central Asia, and North America and some insights and outstanding questions will be presented.

  11. A user need study and system plan for an Arizona Natural Resources Information System report to the Arizona state legislature

    NASA Technical Reports Server (NTRS)

    1980-01-01

    A survey instrument was developed and implemented in order to evaluate the current needs for natural resource information in Arizona and to determine which state agencies have information systems capable of coordinating, accessing and analyzing the data. Data and format requirements were determined for the following categories: air quality, animals, cultural resources, geology, land use, soils, water, vegetation, ownership, and social and economic aspects. Hardware and software capabilities were assessed and a data processing plan was developed. Possible future applications with the next generation LANDSAT were also identified.

  12. Project resources planning and control

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1984-01-01

    This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.

  13. Resource Planning Guide

    Energy Science and Technology Software Center (ESTSC)

    1994-06-30

    RPG1.06 is an (IRP) tool developed so that small public utilities would have a tool to complete an IRP that was in compliance with the Energy Policy Act of 1992. RPG1.06 is divided into three levels: Fast Track, Intermediate, and Detailed. Each level is designed to be completed independently. The Fast Track level is designed for users who want to complete a quick, simple planning study to identify applicable resource options. The Intermediate level ismore » designed for users who want to add their own data and apply weighting factors to the results after completing a quick, simple planning study. The Detailed level is designed for users who want to identify applicable resource options and spend a fair amount of time collecting the data, computing the calculations, and compiling the results. The Detailed level contains a production costing module and optimization algorithms. The software contains the worksheets that appear in the workbook version. Similar to the workbooks, the software worksheets are designed to be completed in numerical order. The software automatically saves the data entered into a worksheet, and carries the data from worksheet to worksheet, completing all calculations. RPG1.06 also contains three additional volumes. Getting Started is an introduction to RPG1.06. Getting Started helps the user understand the differences between the three workbooks and choose the workbook that best fits the users needs. Reference Data contains supply, demand, end-use, weather, and survey data that can be used in lieu of a utility''s own data. Reference Data is particulary helpful for a utility that does not have the time, staff, or money to gather all its own data. The Sample Load Forecasting Methodologies details the steps necessary to complete simple trends, end-use, and economic load forecasts.« less

  14. Local government involvement in long term resource planning for community energy systems. Demand side management

    SciTech Connect

    Not Available

    1992-03-01

    A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

  15. Local government involvement in long term resource planning for community energy systems

    SciTech Connect

    Not Available

    1992-03-01

    A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

  16. Power system modeling and optimization methods vis-a-vis integrated resource planning (IRP)

    NASA Astrophysics Data System (ADS)

    Arsali, Mohammad H.

    1998-12-01

    The state-of-the-art restructuring of power industries is changing the fundamental nature of retail electricity business. As a result, the so-called Integrated Resource Planning (IRP) strategies implemented on electric utilities are also undergoing modifications. Such modifications evolve from the imminent considerations to minimize the revenue requirements and maximize electrical system reliability vis-a-vis capacity-additions (viewed as potential investments). IRP modifications also provide service-design bases to meet the customer needs towards profitability. The purpose of this research as deliberated in this dissertation is to propose procedures for optimal IRP intended to expand generation facilities of a power system over a stretched period of time. Relevant topics addressed in this research towards IRP optimization are as follows: (1) Historical prospective and evolutionary aspects of power system production-costing models and optimization techniques; (2) A survey of major U.S. electric utilities adopting IRP under changing socioeconomic environment; (3) A new technique designated as the Segmentation Method for production-costing via IRP optimization; (4) Construction of a fuzzy relational database of a typical electric power utility system for IRP purposes; (5) A genetic algorithm based approach for IRP optimization using the fuzzy relational database.

  17. A Study of End Users' Perceived Usefulness of and Satisfaction with Enterprise Resource Planning Systems in Higher Education

    ERIC Educational Resources Information Center

    Su, Shau E. Eve

    2012-01-01

    Enterprise resource planning (ERP) systems have become necessities in today's educational arena and are used extensively to improve office productivity and institutional efficacy. As the implementation of ERP systems usually is costly and time-consuming, it is imperative for administrators to understand how end users adopt the introduced…

  18. Improving Training in Enterprise Resource Planning Systems Implementation through Communities of Practice

    ERIC Educational Resources Information Center

    Kerr, Don; Burgess, Kevin J.; Houghton, Luke; Murray, Peter A.

    2012-01-01

    The Enterprise Resource Planning (ERP) literature suggests that effective training is one of the key reasons for success in ERP implementations. However, limited research has been conducted on what constitutes effective training in an ERP environment. A case study approach was used to explore the effectiveness of traditional training and to…

  19. Integrating Workforce Planning, Human Resources, and Service Planning.

    ERIC Educational Resources Information Center

    O'Brien-Pallas, Linda; Birch, Stephen; Baumann, Andrea; Murphy, Gail Tomblin

    The feasibility of integrated health human resources planning (IHHRP) was examined. The analysis focused on the following topics: ways of integrating labor market indicators into service planning; whether planning is sufficiently responsive and flexible to retain relevance and validity in rapidly changing health systems; different models and…

  20. Private and Public Sector Enterprise Resource Planning System Post-Implementation Practices: A Comparative Mixed Method Investigation

    ERIC Educational Resources Information Center

    Bachman, Charles A.

    2010-01-01

    While private sector organizations have implemented enterprise resource planning (ERP) systems since the mid 1990s, ERP implementations within the public sector lagged by several years. This research conducted a mixed method, comparative assessment of post "go-live" ERP implementations between public and private sector organization. Based on a…

  1. Technical-Oriented Enterprise Resource Planning (ERP) Body of Knowledge for Information Systems Programs: Content and Implementation

    ERIC Educational Resources Information Center

    Boyle, Todd A.

    2007-01-01

    In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…

  2. Using Many-Objective Optimization and Robust Decision Making to Identify Robust Regional Water Resource System Plans

    NASA Astrophysics Data System (ADS)

    Matrosov, E. S.; Huskova, I.; Harou, J. J.

    2015-12-01

    Water resource system planning regulations are increasingly requiring potential plans to be robust, i.e., perform well over a wide range of possible future conditions. Robust Decision Making (RDM) has shown success in aiding the development of robust plans under conditions of 'deep' uncertainty. Under RDM, decision makers iteratively improve the robustness of a candidate plan (or plans) by quantifying its vulnerabilities to future uncertain inputs and proposing ameliorations. RDM requires planners to have an initial candidate plan. However, if the initial plan is far from robust, it may take several iterations before planners are satisfied with its performance across the wide range of conditions. Identifying an initial candidate plan is further complicated if many possible alternative plans exist and if performance is assessed against multiple conflicting criteria. Planners may benefit from considering a plan that already balances multiple performance criteria and provides some level of robustness before the first RDM iteration. In this study we use many-objective evolutionary optimization to identify promising plans before undertaking RDM. This is done for a very large regional planning problem spanning the service area of four major water utilities in East England. The five-objective optimization is performed under an ensemble of twelve uncertainty scenarios to ensure the Pareto-approximate plans exhibit an initial level of robustness. New supply interventions include two reservoirs, one aquifer recharge and recovery scheme, two transfers from an existing reservoir, five reuse and five desalination schemes. Each option can potentially supply multiple demands at varying capacities resulting in 38 unique decisions. Four candidate portfolios were selected using trade-off visualization with the involved utilities. The performance of these plans was compared under a wider range of possible scenarios. The most balanced plan was then submitted into the vulnerability

  3. A GIS based district information system for water resources management and planning

    NASA Astrophysics Data System (ADS)

    Tzabiras, John; Spiliotopoulos, Marios; Kokkinos, Kostantinos; Fafoutis, Chrysostomos; Sidiropoulos, Pantelis; Vasiliades, Lampros; Loukas, Athanasios; Mylopoulos, Nikitas

    2014-05-01

    In many watersheds of the Mediterranean Countries, water resources are presently fully or overcommitted. Irrigators are the largest consumers of fresh water in Mediterranean Countries using up to 80% of all allocated water in some regions. Administrative efforts should be directed towards an integrated policy of water allocation which accounts for the characteristics and specificity of each farm, requiring the availability of data bases and management tools (decision support systems) specifically designed to fulfil the objectives of maximizing water use efficiency. The overall objective of this program was the development of a District Information System (DIS) which could be used by stakeholders at purposes of irrigation district day-to-day management as well as for planning and strategic decision-making. The DIS was developed from a GIS-based modelling approach which integrates a generic crop model, a hydraulic module for the water transfer/distribution system and uses remote sensing information. The main sub-objectives were: (i) the development of an operational algorithm to retrieve crop evapotranspiration from remote sensing data, (ii) the development of an information system with friendly user interface for the data base, the crop module and the hydraulic module and (iii) the analysis and validation of management scenarios from model simulations predicting the respective behaviour. Surface Energy Balance Algorithm for Land (SEBAL) was used to derive monthly actual evapotranspiration (ET) values from Landsat TM imagery. Meteorological data from the archive of the Institute for Research and Technology, Thessaly (I.RE.TE.TH) have also been used. The methodology was developed using high quality Landsat TM images during 2007 growing season. Monthly ET values are then used as an input to CROPWAT model. Outputs of CROPWAT model are then used as input for the hydraylic module consisted of TECHNOLOGISMIKI, WATERCAD and WEAP model. Hence, a reference scenario was

  4. Linking Resource Decisions to Planning

    ERIC Educational Resources Information Center

    Saunders, Laura

    2014-01-01

    This chapter explores the relationship between strategic planning and budgeting. It describes how community college leaders can use strategic and foundational plans (academic, facilities, technology, and financial) to drive budgets and resource allocations in support of institutional goals and objectives. Finally, it identifies challenges of doing…

  5. Budgeting by Objectives--How Goals and Objectives, Operational Activities, and Resource Allocation Are Integrated in a Planning System. AIR 1984 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Capoor, Madan

    The Objective-Based Assessment, Planning, and Resource Allocation System (OAPRAS) that was developed and implemented at Middlesex County College is described. The integrated self-assessment planning and budgeting system was developed in 1981. The central purpose of OAPRAS was to link resource allocation decisions to the prioritized objectives that…

  6. Integrated Resource Planning Model (IRPM)

    SciTech Connect

    Graham, T. B.

    2010-04-01

    The Integrated Resource Planning Model (IRPM) is a decision-support software product for resource-and-capacity planning. Users can evaluate changing constraints on schedule performance, projected cost, and resource use. IRPM is a unique software tool that can analyze complex business situations from a basic supply chain to an integrated production facility to a distributed manufacturing complex. IRPM can be efficiently configured through a user-friendly graphical interface to rapidly provide charts, graphs, tables, and/or written results to summarize postulated business scenarios. There is not a similar integrated resource planning software package presently available. Many different businesses (from government to large corporations as well as medium-to-small manufacturing concerns) could save thousands of dollars and hundreds of labor hours in resource and schedule planning costs. Those businesses also could avoid millions of dollars of revenue lost from fear of overcommitting or from penalties and lost future business for failing to meet promised delivery by using IRPM to perform what-if business-case evaluations. Tough production planning questions that previously were left unanswered can now be answered with a high degree of certainty. Businesses can anticipate production problems and have solutions in hand to deal with those problems. IRPM allows companies to make better plans, decisions, and investments.

  7. 76 FR 39470 - Integrated Resource Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ... TVA uses state-of-the-art energy forecasting models to predict future demands on its system. Because... using a capacity planning model. The capacity planning model built each portfolio from a range of..., enhanced management of other properties, documentation and recovery of cultural resources,...

  8. Psychiatrist Health Human Resource Planning - An Essential Component of a Hospital-Based Mental Healthcare System Transformation.

    PubMed

    Jarmain, Sarah

    2016-01-01

    The World Health Organization (WHO) defines health human resource planning as "the process of estimating the number of persons and the kinds of knowledge, skills, and attitudes they need to achieve predetermined health targets and ultimately health status objectives" (OHA 2015). Health human resource planning is a critical component of successful organizational and system transformation, and yet little has been written on how to do this for physicians at the local level. This paper will outline a framework for developing and managing key aspects of physician human resource planning related to both the quantity and quality of work within a hospital setting. Using the example of a complex multiphase hospital-based mental health transformation that involved both the reduction and divestment of beds and services, we will outline how we managed the physician human resource aspects to establish the number of psychiatrists needed and the desired attributes of those psychiatrists, and how we helped an existing workforce transition to meet the new expectations. The paper will describe a process for strategically aligning the selection and management of physicians to meet organizational vision and mandate. PMID:26854544

  9. Beta Test Plan for Advanced Inverters Interconnecting Distributed Resources with Electric Power Systems

    SciTech Connect

    Hoke, A.; Chakraborty, S.; Basso, T.; Coddington, M.

    2014-01-01

    This document provides a preliminary (beta) test plan for grid interconnection systems of advanced inverter-based DERs. It follows the format and methodology/approach established by IEEE Std 1547.1, while incorporating: 1. Upgraded tests for responses to abnormal voltage and frequency, and also including ride-through. 2. A newly developed test for voltage regulation, including dynamic response testing. 3. Modified tests for unintentional islanding, open phase, and harmonics to include testing with the advanced voltage and frequency response functions enabled. Two advanced inverters, one single-phase and one three-phase, were tested under the beta test plan. These tests confirmed the importance of including tests for inverter dynamic response, which varies widely from one inverter to the next.

  10. Developing an integrated ecological resource management and monitoring plan as part of an environmental management system

    SciTech Connect

    Michael, D.; Hooten, M.; Kelly, E.; Roy-Harrison, W.

    1997-04-01

    Recent interest in defining the appropriate content of an Environmental Management System (EMS) as specified by ISO 14001 prompted a study to determine how ecological concerns should be integrated into an EMS and subsequently implemented. This paper describes an approach for developing objectives, targets, and processes for ecological resource management at those Department of Energy (DOE) facilities where an ecological resource management approach that goes beyond simple regulatory compliance is warranted. A major goal of this approach is to position DOE facilities so that they can proactively address ecological concerns, rather than being forced to respond retroactively to damage claims, restoration requirements, and/or bad publicity. Although DOE is not requiring ISO 14001 implementation at its facilities, it is recommending ISO 14001 as a voluntary approach to encourage good environmental practices, such as pollution prevention and sustainable development, by adopting an integrated systems approach. The DOE position is that existing DOE orders and policy statements are consistent with, and have elements of, the ISO 14001 EMS approach.

  11. The Social Process of Analyzing Real Water Resource Systems Plans and Management Policies

    NASA Astrophysics Data System (ADS)

    Loucks, Daniel

    2016-04-01

    Developing and applying systems analysis methods for improving the development and management of real world water resource systems, I have learned, is primarily a social process. This talk is a call for more recognition of this reality in the modeling approaches we propose in the papers and books we publish. The mathematical models designed to inform planners and managers of water systems that we see in many of our journals often seem more complex than they need be. They also often seem not as connected to reality as they could be. While it may be easier to publish descriptions of complex models than simpler ones, and while adding complexity to models might make them better able to mimic or resemble the actual complexity of the real physical and/or social systems or processes being analyzed, the usefulness of such models often can be an illusion. Sometimes the important features of reality that are of concern or interest to those who make decisions can be adequately captured using relatively simple models. Finding the right balance for the particular issues being addressed or the particular decisions that need to be made is an art. When applied to real world problems or issues in specific basins or regions, systems modeling projects often involve more attention to the social aspects than the mathematical ones. Mathematical models addressing connected interacting interdependent components of complex water systems are in fact some of the most useful methods we have to study and better understand the systems we manage around us. They can help us identify and evaluate possible alternative solutions to problems facing humanity today. The study of real world systems of interacting components using mathematical models is commonly called applied systems analyses. Performing such analyses with decision makers rather than of decision makers is critical if the needed trust between project personnel and their clients is to be developed. Using examples from recent and ongoing

  12. A GIS based watershed information system for water resources management and planning in semi-arid areas

    NASA Astrophysics Data System (ADS)

    Tzabiras, John; Spiliotopoulos, Marios; Kokkinos, Kostantinos; Fafoutis, Chrysostomos; Sidiropoulos, Pantelis; Vasiliades, Lampros; Papaioannou, George; Loukas, Athanasios; Mylopoulos, Nikitas

    2015-04-01

    The overall objective of this work is the development of an Information System which could be used by stakeholders for the purposes of water management as well as for planning and strategic decision-making in semi-arid areas. An integrated modeling system has been developed and applied to evaluate the sustainability of water resources management strategies in Lake Karla watershed, Greece. The modeling system, developed in the framework of "HYDROMENTOR" research project, is based on a GIS modelling approach which uses remote sensing data and includes coupled models for the simulation of surface water and groundwater resources, the operation of hydrotechnical projects (reservoir operation and irrigation works) and the estimation of water demands at several spatial scales. Lake Karla basin was the region where the system was tested but the methodology may be the basis for future analysis elsewhere. Τwo (2) base and three (3) management scenarios were investigated. In total, eight (8) water management scenarios were evaluated: i) Base scenario without operation of the reservoir and the designed Lake Karla district irrigation network (actual situation) • Reduction of channel losses • Alteration of irrigation methods • Introduction of greenhouse cultivation ii) Base scenario including the operation of the reservoir and the Lake Karla district irrigation network • Reduction of channel losses • Alteration of irrigation methods • Introduction of greenhouse cultivation The results show that, under the existing water resources management, the water deficit of Lake Karla watershed is very large. However, the operation of the reservoir and the cooperative Lake Karla district irrigation network coupled with water demand management measures, like reduction of water distribution system losses and alteration of irrigation methods, could alleviate the problem and lead to sustainable and ecological use of water resources in the study area. Acknowledgements: This study

  13. Strategy of Water Resources Planning Under Risk

    NASA Astrophysics Data System (ADS)

    Wang, Z.; Ye, M.

    2007-12-01

    In water resources systems analysis, risk, caused by uncertainty, is an important issue to consider, whereas definition of risk and its measure is controversial (many definitions are available in different research fields). The problem of computing the degree of risk in water resources planning is very difficult, and has received more and more attentions from more hydrologists. This study discussed the necessity of risk analysis on decision-making associated with problems of managing regional water quantity. A new concept of risk function for regional water resource planning was introduced, and a theory of risk analysis of water resource systems was developed and implemented numerically. The developed methodology is general and can be used to tackle many kinds of decision-making problems. When loss (or benefit) volumes of an action set and probabilities of nature state of decision environments are given, non-inferior planning strategy or strategies can be derived by ordering the size of risk degrees calculated by the proposed risk function. This method was illustrated in a case study at the Huanghuaihai basin, China, one of the major food-producing areas in north China. In the last several decades, problems of water shortage and pollution are severe, and extreme weather conditions frequently occur. How to reasonably allocate the limited fresh water in the future under uncertainty is an urgent task. In this research, alternative strategies of water resource planning were investigated and risk of the strategies was assessed to facilitate the decision-making of Chinese government. The developed methodology selected the optimum choice of water resources planning strategies to avoid the risk of water shortage. This research has practicably provided support of decision-making of the Chinese central and local governments and organizations in their regional and national planning.

  14. 76 FR 57100 - Natural Resource Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... Natural Resource Plan AGENCY: Tennessee Valley Authority (TVA). ACTION: Issuance of Record of Decision...) for the Natural Resource Plan (NRP). The notice of availability of the Final Environmental Impact Statement for the Natural Resource Plan was published in the Federal Register on July 15, 2011. The...

  15. Resource Allocation Planning Helper (RALPH): Lessons learned

    NASA Technical Reports Server (NTRS)

    Durham, Ralph; Reilly, Norman B.; Springer, Joe B.

    1990-01-01

    The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.

  16. Bow-corridor local integrated resource plan: Draft plan

    SciTech Connect

    Not Available

    1990-01-01

    This plan presents the Government of Alberta's resource management policy for public lands and resources within the Bow Corridor. Resource potentials and opportunities for development are identified to assist in the economic progress of the province. The plan includes identification of its purpose and scope and the context in which it is presented; and resource management objectives and guidelines for ecological and aesthetic resources, fisheries, forests, historical resources, minerals, range land, settlement, tourism/recreation, water and watersheds and wildlife.

  17. AgRISTARS: Renewable resources inventory. Land information support system implementation plan and schedule. [San Juan National Forest pilot test

    NASA Technical Reports Server (NTRS)

    Yao, S. S. (Principal Investigator)

    1981-01-01

    The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.

  18. Resource assessment/commercialization planning meeting

    SciTech Connect

    1980-01-24

    The U.S. Department of Energy, Division of Geothermal Energy and Division of Geothermal Resource Management, sponsored a Resource Assessment/Commercialization Planning meeting in Salt Lake City on January 21-24, 1980. The meeting included presentations by state planning and resource teams from all DOE regions. An estimated 130 people representing federal, state and local agencies, industry and private developers attended.

  19. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  20. Involving human resources in strategic planning.

    PubMed

    Eisenberg, B

    1988-07-01

    Too often, human-resources departments are not fully involved in strategic planning. However, any plan that neglects work-force recruitment, structure and motivation is incomplete. The author explains how a human-resources department can strengthen its function and become part of the planning process from the beginning. PMID:10302676

  1. Strategic Human Resource Planning in Academia

    ERIC Educational Resources Information Center

    Ulferts, Gregory; Wirtz, Patrick; Peterson, Evan

    2009-01-01

    A strategic plan guides a college in successfully meeting its mission. Based on the strategic plan, a college can develop a human resource plan that will allow it to make management decisions in the present to support the future direction of the college. The overall purpose of human resource management is to: (1) ensure the organization has…

  2. Primer on gas integrated resource planning

    SciTech Connect

    Goldman, C.; Comnes, G.A.; Busch, J.; Wiel, S.

    1993-12-01

    This report discusses the following topics: gas resource planning: need for IRP; gas integrated resource planning: methods and models; supply and capacity planning for gas utilities; methods for estimating gas avoided costs; economic analysis of gas utility DSM programs: benefit-cost tests; gas DSM technologies and programs; end-use fuel substitution; and financial aspects of gas demand-side management programs.

  3. Modeling renewable energy resources in integrated resource planning

    SciTech Connect

    Logan, D.; Neil, C.; Taylor, A.

    1994-06-01

    Including renewable energy resources in integrated resource planning (IRP) requires that utility planning models properly consider the relevant attributes of the different renewable resources in addition to conventional supply-side and demand-side options. Otherwise, a utility`s resource plan is unlikely to have an appropriate balance of the various resource options. The current trend toward regulatory set-asides for renewable resources is motivated in part by the perception that the capabilities of current utility planning models are inadequate with regard to renewable resources. Adequate modeling capabilities and utility planning practices are a necessary prerequisite to the long-term penetration of renewable resources into the electric utility industry`s resource mix. This report presents a review of utility planning models conducted for the National Renewable Energy Laboratory (NREL). The review examines the capabilities of utility planning models to address key issues in the choice between renewable resources and other options. The purpose of this review is to provide a basis for identifying high priority areas for advancing the state of the art.

  4. User Requirements for the Application of Remote Sensing in the Planning and Management of Water Resource Systems

    NASA Technical Reports Server (NTRS)

    Burgy, R. H.

    1972-01-01

    Data relating to hydrologic and water resource systems and subsystems management are reported. Systems models, user application, and remote sensing technology are covered. Parameters governing water resources include evaportranspiration, vegetation, precipitation, streams and estuaries, reservoirs and lakes, and unsaturate and saturated soil zones.

  5. Resource allocation planning with international components

    NASA Technical Reports Server (NTRS)

    Burke, Gene; Durham, Ralph; Leppla, Frank; Porter, David

    1993-01-01

    Dumas, Briggs, Reid and Smith (1989) describe the need for identifying mutually acceptable methodologies for developing standard agreements for the exchange of tracking time or facility use among international components. One possible starting point is the current process used at the Jet Propulsion Laboratory (JPL) in planning the use of tracking resources. While there is a significant promise of better resource utilization by international cooperative agreements, there is a serious challenge to provide convenient user participation given the separate project and network locations. Coordination among users and facility providers will require a more decentralized communication process and a wider variety of automated planning tools to help users find potential exchanges. This paper provides a framework in which international cooperation in the utilization of ground based space communication systems can be facilitated.

  6. Distribution system harmonic filter planning

    SciTech Connect

    Ortmeyer, T.H.; Hiyama, Takashi

    1996-10-01

    A planning methodology for distribution system harmonic filtering is proposed. The method is intended for use on radial distribution systems with no large harmonic sources. It is proposed that 60 hertz var planning be done first to allocate the var resources. Following this process, the harmonic filter planning can be readily accomplished. Characteristics of the distribution systems and the harmonic sources are exploited to provide a practical filter planning technique which is effective and efficient.

  7. Increasing Organizational Effectiveness through Better Human Resource Planning and Development

    ERIC Educational Resources Information Center

    Schein, Edgar H.

    1977-01-01

    Discusses the increasing importance of human resource planning and development for organizational effectiveness, and examines how the major components of a human resource planning and development system should be coordinated for maximum effectiveness. Available from Alfred P. Sloan School of Management, Massachusetts Institute of Technology,…

  8. OAST system technology planning

    NASA Technical Reports Server (NTRS)

    Sadin, S. R.

    1978-01-01

    The NASA Office of Aeronautics and Space Technology developed a planning model for space technology consisting of a space systems technology model, technology forecasts and technology surveys. The technology model describes candidate space missions through the year 2000 and identifies their technology requirements. The technology surveys and technology forecasts provide, respectively, data on the current status and estimates of the projected status of relevant technologies. These tools are used to further the understanding of the activities and resources required to ensure the timely development of technological capabilities. Technology forecasting in the areas of information systems, spacecraft systems, transportation systems, and power systems are discussed.

  9. Linking Career Development and Human Resource Planning.

    ERIC Educational Resources Information Center

    Gutteridge, Thomas G.

    When organizations integrate their career development and human resources planning activities into a comprehensive whole, it is the exception rather than the rule. One reason for the frequent dichotomy between career development and human resource planning is the failure to recognize that they are complements rather than synonyms or substitutes.…

  10. Human Resources Development Plan, 1989-90.

    ERIC Educational Resources Information Center

    Parmenter, Bill; And Others

    The human resources development plan presented in this report was developed by Cypress College (CC) to increase or refresh the knowledge and skills of classified staff, faculty, and administrators. The report reviews the colleges staff development plan, activities for 1988-89, and plans for 1989-90. Section I provides an overview of CC's staff…

  11. Computer-aided resource planning and scheduling for radiological services

    NASA Astrophysics Data System (ADS)

    Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.

    1996-05-01

    There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.

  12. Environmental regulations alter resource planning methodology

    SciTech Connect

    Castro, R.D.

    1997-05-01

    The advent of regulations governing the volume of air pollutants emitted may force radical alterations in traditional economics-based resource planning. A review of the effect on regional resource planning of adopted emission rules for the Los Angeles basin may benefit utility resource planners. The 1990 amendments to the Clean Air Act (Amendments) concerning utility generation has prompted a reassessment of resource planning methodology. The current methodology does not account for the restrictive NOx emission limits imposed by the Amendments. A new procedure needs to be developed that considers environmental impacts in the selection of the most economical resource plan. Historically, economic aspects of dispatch and generation has dominated the focus of resource planners; for most of the larger utilities, resource planning usually entailed performing analyses with convolution-based production costing software. This method is used because it resolves the prohibitively large run times associated with the exhaustively comprehensive enumeration method of matching loads with resources. An alternative method of analysis, Monte Carlo, requires a larger number of iterations to achieve the precision of convolution. Additionally, the Monte Carlo method`s of convergence, as compared to the convolution method, is much more sensitive to the number of operating units, the number of operating states, the range of input data, and the convergence criteria.

  13. Human Resource Planning for Equity and Efficiency.

    ERIC Educational Resources Information Center

    Martin, Ann M.

    1982-01-01

    The author discusses the factors which must be considered for effective human resource planning. These factors include a grasp of regional reindustrialization, social and demographic changes, and social and economic priorities.

  14. Hanford cultural resources management plan

    SciTech Connect

    Chatters, J.C.

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  15. Just Do It: Resources for Interpretive Planning

    ERIC Educational Resources Information Center

    Koepler, Jes

    2008-01-01

    Now that you have finished reading this journal issue and understand what interpretive planning is and when to apply it, how can you get started and just "do" it? This article provides an annotated list of practical handbooks and internet resources that provide guidelines for museum practitioners to engage in interpretive planning at institutions…

  16. Human Resource Planning: An Introduction. Report 312.

    ERIC Educational Resources Information Center

    Reilly, Peter

    This report is designed to give readers an introduction to the principles of human resource planning (HRP) and the areas in which it can be used, including those facing today's managers. Chapter 1 outlines why some organizations no longer plan, describes the background of change and uncertainty that discouraged them, and defines HRP. Chapter 2…

  17. Human Resources Development Plan, 1990-91.

    ERIC Educational Resources Information Center

    Thomas, Carmelita; And Others

    This report details the human resources development activities undertaken at Cypress College (CC) using Assembly Bill 1725 funds. The report includes information on activities conducted during the 1989-90 school and those planned for the 1990-1991 school year, along with results from needs assessments and evaluation surveys. The plan is divided…

  18. Integrated Resource Planning at Electric Utilities: The Planning Process.

    ERIC Educational Resources Information Center

    Hirst, Eric

    1989-01-01

    Activities during the initial 18-month cycle of the Demand and Resource Evaluation (DARE) Program of the Puget Sound Power and Light Company (Washington State) are described. The role of evaluation in public utility planning is discussed. Cooperation, communication, and consensus among utility planning staff are concluded to be vital. (SLD)

  19. Distributed sensor resource management and planning

    NASA Astrophysics Data System (ADS)

    Khosla, Deepak; Guillochon, James

    2007-04-01

    The goal of sensor resource management (SRM) is to allocate resources appropriately in order to gain as much information as possible about a system. In our previous paper, we introduced a centralized non-myopic planning algorithm, C-SPLAN, that uses sparse sampling to estimate the value of resource assignments. Sparse sampling is related to Monte Carlo simulation. In the SRM problem we consider, our network of sensors observes a set of tracks; each sensor can be set to operate in one of several modes and/or viewing geometries. Each mode incurs a different cost and provides different information about the tracks. Each track has a kinematic state and is of a certain class; the sensors can observe either or both of these, depending on their mode of operation. The goal is to maximize the overall rate of information gain, i.e. rate of improvement in kinematic tracking and classification accuracy of all tracks in the Area of Interest. We compared C-SPLAN's performance on several tracking and target identification problems to that of other algorithms. In this paper we extend our approach to a distributed framework and present the D-SPLAN algorithm. We compare the performance as well as computational and communications costs of C-SPLAN and D-SPLAN as well as near-term planners.

  20. Water resources management plan: Great Basin National Park

    SciTech Connect

    Jacobs, R.W.; Flora, M.

    1994-06-01

    The enabling legislation creating Great Basin National Park calls for the National Park Service (NPS) to protect, manage, and administer the park in such manner as to conserve and protect the scenery as well as the natural, geologic, historic, and archaeological resources of the park. NPS policies require that each unit of the National Park System develop and implement a General Management Plan (GMP). This plan is designed to serve as a management action plan to guide park water-related activities over the next 10 to 15 years. This WRMP is complementary to, and consistent with, other existing park management documents, including the GMP (NPS 1993) and Resource Management Plan (in review).

  1. National conference on integrated resource planning: Proceedings

    SciTech Connect

    Not Available

    1991-12-31

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers` short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners` (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  2. National Conference on Integrated Resource Planning: Proceedings

    NASA Astrophysics Data System (ADS)

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; and key regulatory issues facing gas utilities during the next five years.

  3. National conference on integrated resource planning: Proceedings

    SciTech Connect

    Not Available

    1991-01-01

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  4. Getting Human Resource Planning on the Dean's List.

    ERIC Educational Resources Information Center

    Vetter, Eric W.

    1985-01-01

    The author analyzes human resource planning, in which he gives the various aspects of career development a report card that, the author states, shows the field is far from achieving its self-stated goals. He states that succession planning and systems approaches would help this situation. (CT)

  5. Resource envelope concepts for mission planning

    NASA Technical Reports Server (NTRS)

    Ibrahim, K. Y.; Weiler, J. D.; Tokaz, J. C.

    1991-01-01

    Seven proposed methods for creating resource envelopes for Space Station Freedom mission planning are detailed. Four reference science activity models are used to illustrate the effect of adding operational flexibility to mission timelines. For each method, a brief explanation is given along with graphs to illustrate the application of the envelopes to the power and crew resources. The benefits and costs of each method are analyzed in terms of resource utilization. In addition to the effect on individual activities, resource envelopes are analyzed at the experiment level.

  6. Optics Supply Planning System

    SciTech Connect

    Gaylord, J

    2009-04-30

    at a level of detail that can be used for construction and deployment. Test and quality assurance plans are also included to insure that the system delivers all requirements when it is built. The design is for an automated forecasting prototype that allocates inventory and processing resources in response to potentially daily changes in the forecasted optics exchanges required to operate NIF. It will automatically calculate future inventory levels and processing rates based on current inventory and projected exchanges, procurements, and capacities. It will include screens that allow users to readily assess the feasibility of the forecast, identify failures to meet the demand, revise input data, and re-run the automated forecast calculation. In addition, the system will automatically retrieve the current exchange demand from an external database. Approved forecasts from the system will automatically update work order plans and procurement plans in the existing inventory and production control database. The timing of optics exchanges affects the forecast of damage and future exchanges, so an approved exchange plan will be fed back to the demand database and be used to calculate the next demand projection. The system will read the demand data and update the forecast and output files daily. This specification has been divided into two parts. This document, Part 1 lays out the major design decisions and specifies the architectural, component, and data structure designs. Part 2 will add interface designs, quality assurance and testing plans, and deployment details.

  7. Human Resource Accounting System

    ERIC Educational Resources Information Center

    Cerullo, Michael J.

    1974-01-01

    Main objectives of human resource accounting systems are to satisfy the informational demands made by investors and by operating managers. The paper's main concern is with the internal uses of a human asset system. (Author)

  8. Planning with Continuous Resources in Stochastic Domains

    NASA Technical Reports Server (NTRS)

    Mausam, Mausau; Benazera, Emmanuel; Brafman, Roneu; Hansen, Eric

    2005-01-01

    We consider the problem of optimal planning in stochastic domains with metric resource constraints. Our goal is to generate a policy whose expected sum of rewards is maximized for a given initial state. We consider a general formulation motivated by our application domain--planetary exploration--in which the choice of an action at each step may depend on the current resource levels. We adapt the forward search algorithm AO* to handle our continuous state space efficiently.

  9. Nevada Test Site Resource Management Plan

    SciTech Connect

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  10. Exploiting map plans as resources for action

    NASA Technical Reports Server (NTRS)

    Payton, David

    1989-01-01

    When plans are used as programs for controlling the action of autonomous or teleoperated robots, their abstract representation can easily obscure a great deal of the critical knowledge that originally led to the planned course of action. An autonomous vehicle experiment is highlighted which illustrates how the information barriers created by abstraction can result in undesirable action. It is then shown how the same task can be performed correctly using plans as a resource for action. As a result of this simple change in outlook, problems requiring opportunistic reaction to unexpected changes in the environment can be solved.

  11. C++ Planning and Resource Reasoning (PARR) shell

    NASA Technical Reports Server (NTRS)

    Mcintyre, James; Tuchman, Alan; Mclean, David; Littlefield, Ronald

    1994-01-01

    This paper describes a generic, C++ version of the Planning and Resource Reasoning (PARR) shell which has been developed to supersede the C-based versions of PARR that are currently used to support AI planning and scheduling applications in flight operations centers at Goddard Space Flight Center. This new object-oriented version of PARR can be more easily customized to build a variety of planning and scheduling applications, and C++ PARR applications can be more easily ported to different environments. Genetic classes, constraints, strategies, and paradigms are described along with two types of PARR interfaces.

  12. Analyzing tradeoffs between hydropower production and hydrological alteration to support water resources planning in large river systems

    NASA Astrophysics Data System (ADS)

    Micotti, Marco; Pianosi, Francesca; Bizzi, Simone; Mason, Emanuele; Weber, Enrico

    2014-05-01

    In many countries water is a key renewable resource to complement carbon-emitting energy production in the face of demand pressure from fast-growing industrial production and urbanization. In this study, we analyze the case of the Red River Vietnam, a large basin of 169.000 kmq where the storing capacity, mainly targeted at hydropower production, has steadily increased since from the Eighties through the construction of a number of reservoirs (Hoa Binh completed in 1994, Tuyen Quang in 2008, Son La in 2012), which nowadays account for the 15% of the national electric power production. On the other hand, reservoir operation dramatically alters downstream river hydrology, geomorphological processes and riverine ecosystems. In this work, we focus in particular on the alteration of the hydrological regime downstream of the Hoa Binh reservoir and explore re-operation options to mitigate the hydrological alteration while guaranteeing reasonable hydropower production. To reach this goal we (i) define an index of hydrological alteration starting from the well established set of Indicators of Hydrological Alteration and applying a novel selection and aggregation procedure; (ii) embed such an index into a multi-objective optimization process, to design reservoir operating policies that represent Pareto-optimal solutions between maximization of hydropower production and minimization of hydrological alteration. This work demonstrates the potential of multi-objective optimization and simulation tools to analyze tradeoffs between conflicting needs and thus support the evaluation and planning of sustainable energy production programs.

  13. Agricultural Resources: Program Planning Guide: Volume 6.

    ERIC Educational Resources Information Center

    German, Carl; And Others

    The program planning guide for agricultural resources was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of forests, recreation, soil, wildlife, and other agricultural…

  14. Enterprise Resource Planning Implementation in Higher Education

    ERIC Educational Resources Information Center

    Graham, James F.

    2009-01-01

    Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…

  15. Emerging climate services for water resources planning

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The author’s perspective on new or experimental forecasts and data products that may be important for water resource planning were shared. Everyone who lives and works with the consequences of weather and climate have known or suspected for years that climate is shifting, have been adapting, and wa...

  16. Enterprise Resource Planning Software in the Human Resource Classroom

    ERIC Educational Resources Information Center

    Bedell, Michael D.; Floyd, Barry D.; Nicols, Kay McGlashan; Ellis, Rebecca

    2007-01-01

    The relatively recent development of comprehensive human resource information systems (HRIS) software has led to a large demand for technologically literate human resource (HR) professionals. For the college student who is about to begin the search for that first postcollege job, the need to develop technology literacy is even more necessary. To…

  17. Special Education Resource System.

    ERIC Educational Resources Information Center

    Kampert, George J.

    The guide to the Special Education Resource System (SERS) of the Flour Bluff (Texas) school system contains policies and procedures regarding organization, services, and process of the system. Noted is the SERS purpose of providing information and access to appropriate instructional media and materials for special education personnel. Briefly…

  18. Factors Influencing Post-Adoptive Enterprise Resource Planning (ERP) Utilization

    ERIC Educational Resources Information Center

    McGinnis, Thomas C.

    2011-01-01

    Organizations expend a great deal of time, effort and money on the implementation of enterprise resource planning (ERP) systems. They are considered the price of entry for large organizations to do business. Yet the success rate of ERP systems is poor. IS literature suggests that one possible reason for this is the underutilization of these…

  19. The planning and control of NASA programs and resources

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.

  20. Forest Resource Information System

    NASA Technical Reports Server (NTRS)

    Mrocznyski, R. P.

    1983-01-01

    Twenty-three processing functions aid in utilizing LANDSAT data for forest resource management. Designed to work primarily with digital data obtained from measurements recorded by multispectral remote sensors mounted on aerospace platforms. communication between processing functions, simplicity of control, and commonality of data files in LARSFRIS enhance usefulness of system as tool for research and development of remote sensing systems.

  1. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  2. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  3. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  4. Ground data systems resource allocation process

    NASA Technical Reports Server (NTRS)

    Berner, Carol A.; Durham, Ralph; Reilly, Norman B.

    1989-01-01

    The Ground Data Systems Resource Allocation Process at the Jet Propulsion Laboratory provides medium- and long-range planning for the use of Deep Space Network and Mission Control and Computing Center resources in support of NASA's deep space missions and Earth-based science. Resources consist of radio antenna complexes and associated data processing and control computer networks. A semi-automated system was developed that allows operations personnel to interactively generate, edit, and revise allocation plans spanning periods of up to ten years (as opposed to only two or three weeks under the manual system) based on the relative merit of mission events. It also enhances scientific data return. A software system known as the Resource Allocation and Planning Helper (RALPH) merges the conventional methods of operations research, rule-based knowledge engineering, and advanced data base structures. RALPH employs a generic, highly modular architecture capable of solving a wide variety of scheduling and resource sequencing problems. The rule-based RALPH system has saved significant labor in resource allocation. Its successful use affirms the importance of establishing and applying event priorities based on scientific merit, and the benefit of continuity in planning provided by knowledge-based engineering. The RALPH system exhibits a strong potential for minimizing development cycles of resource and payload planning systems throughout NASA and the private sector.

  5. SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

    NASA Technical Reports Server (NTRS)

    Thalman, Nancy E.; Sparn, Thomas P.

    1990-01-01

    SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

  6. Strategic Enterprise Resource Planning for Global Supply Chain Competitiveness

    ERIC Educational Resources Information Center

    Nageswararao, A. V.; Sahu, Dasarathi; Mohan, V. Krishna

    2011-01-01

    Strategic Enterprise Resource planning (SERP) systems are networked and integrated information mechanisms which are developed to achieve competitive advantage for organizations operating in global scale. It plays a vital role in Integrating various stake holders and channel partners involved in day to day operations. In the present Globalized…

  7. Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach

    ERIC Educational Resources Information Center

    Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.

    2004-01-01

    Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…

  8. Ensuring Lessons Teach the Curriculum with a Lesson Plan Resource

    ERIC Educational Resources Information Center

    Craft, Heddi; Bland, Paul D.

    2004-01-01

    The Curriculum Leadership Institute (CLI) and classroom teachers working in conjunction with Emporia State University in Emporia, Kansas, developed the Lesson Plan Resource system. The CLI is a not-for-profit school consulting and publishing firm, also based in Emporia, Kansas, whose curriculum development model is used in over 1,000 schools in…

  9. Environmental Management System Plan

    SciTech Connect

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  10. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF... Resource Management Planning § 1610.4 Resource management planning process....

  11. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF... Resource Management Planning § 1610.4 Resource management planning process....

  12. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF... Resource Management Planning § 1610.4 Resource management planning process....

  13. 76 FR 54195 - 2010 Resources Planning Act (RPA) Assessment Draft

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... Forest Service 2010 Resources Planning Act (RPA) Assessment Draft AGENCY: Forest Service, USDA. ACTION: Notice of availability; request for comment. SUMMARY: The draft 2010 Resources Planning Act (RPA... Resources Planning Act (RPA) Assessment is the fifth prepared in response to the mandate in the Forest...

  14. National Implications for Urban School Systems: Strategic Planning in the Human Resource Management Department in a Large Urban School District

    ERIC Educational Resources Information Center

    Johnson, Clarence; Kritsonis, William Allan

    2007-01-01

    This article addresses several key ongoing issues in a large urban school district. Literature focuses on what make a large urban school district effective in Human Resource Management. The effectiveness is addressed through recruitment and retention practices. A comparison of the school district with current research is the main approach to the…

  15. The Planning, Programming, Budgeting, and Evaluation System of the Board of Education for the Borough of York. Management of Educational Resources System (MERS). Progress Report Number One.

    ERIC Educational Resources Information Center

    York Borough Board of Education, Toronto (Ontario).

    Three aspects of the York Borough's school instructional programs are discussed: program structure, program costs, and program evaluation. Some basic philosophies of the Management of Educational Resources System (MERS) are set forth and the early history of the project is described showing how the boardwide MERS evolved from a pilot experiment…

  16. Water resource systems group

    NASA Astrophysics Data System (ADS)

    Stedinger, Jery R.; Lettenmaier, Dennis P.

    The 11th meeting of the Water Resource Systems Group was held at the University of Washington (Seattle), August 7-8, 1987. These systems group meetings, which are informal gatherings of professionals who have an interest in the educational and research aspects of water resources systems analysis, have usually been held on university campuses. The 30 attendees of the 1987 meeting represented a cross section of university faculty and graduate students, government managers and researchers, and engineering consultants.The meeting opened with short discussions by Steve Burges (University of Washington), Chuck Howard (CDD Howard and Associates, Victoria, Canada), David Dawdy (consultant, San Francisco, Calif.), and Jon Liebman (University of Illinois, Urbana) outlining their views of current issues in the water resources area. Burges emphasized the limitations and inadequacies of many of the models currently used in hydrology: rainfall runoff models may not adequately capture the physical characteristics of the movement of water into channels, vadose and saturated zone pollutant transport models are incapable of reproducing many of the features observed in the field, and many streamflow forecasting models used for reservoir operations have been constructed to reproduce average conditions but break down under the extreme conditions (floods and droughts) where they are most needed.

  17. Resources Management System

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Delta Data Systems, Inc. was originally formed by NASA and industry engineers to produce a line of products that evolved from ELAS, a NASA-developed computer program. The company has built on that experience, using ELAS as the basis for other remote sensing products. One of these is AGIS, a computer package for geographic and land information systems. AGIS simultaneously processes remotely sensed and map data. The software is designed to operate on a low cost microcomputer, putting resource management tools within reach of small operators.

  18. An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem. [Spacelab inventory procurement planning

    NASA Technical Reports Server (NTRS)

    Schlagheck, R. A.

    1977-01-01

    New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

  19. Ocean energy systems: Multiyear program plan

    NASA Astrophysics Data System (ADS)

    1980-05-01

    Specific planned activities to be conducted by the Department of Energy in connection with the Ocean Energy System Program for FY 1979 through FY 1984 are described. Program funding is presently 95 percent OTEC, with 5 percent directed toward alternate energy sources such as salinity gradients waves and currents, technical status, ocean energy systems resource requirements, issues, and a management plan are discussed.

  20. The Importance of Human Resource Planning in Industrial Enterprises

    NASA Astrophysics Data System (ADS)

    Koltnerová, Kristína; Chlpeková, Andrea; Samáková, Jana

    2012-12-01

    Human resource planning in the business practice should represent generally used and key activity for human resource management because human resource planning helps to make optimum utilisation of the human resources in the enterprise and it helps to avoid wastage of human resources. Human resource planning allows to forecast the future manpower requirements and also to forecast the number and type of employees who will be required by the enterprise in a near future. In the long term period, success of any enterprise depends on whether the right people are in the right places at the right time, which is the nature of human resource planning. The aim of this contribution is to explain the importance of human resource planning and to outline results of questionnaire survey which it was realized in industrial enterprises.

  1. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    ERIC Educational Resources Information Center

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  2. Mid-Plains Community College Area Human Resources Development Plan.

    ERIC Educational Resources Information Center

    Mid-Plains Community Coll. Area, North Platte, NE. Office of Institutional Research.

    This Human Resource Development Plan represents an effort to systematize human resources and personnel development at Mid-Plains Community College Area (MPCCA). The need for creating such a plan was specifically cited by North Central consultant evaluators, and a Human Resources Development (HRD) Steering Committee was established in spring 1994…

  3. Planning for partnerships: Maximizing surge capacity resources through service learning.

    PubMed

    Adams, Lavonne M; Reams, Paula K; Canclini, Sharon B

    2015-01-01

    Infectious disease outbreaks and natural or human-caused disasters can strain the community's surge capacity through sudden demand on healthcare activities. Collaborative partnerships between communities and schools of nursing have the potential to maximize resource availability to meet community needs following a disaster. This article explores how communities can work with schools of nursing to enhance surge capacity through systems thinking, integrated planning, and cooperative efforts. PMID:26750818

  4. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning guidance. 1610.1 Section 1610.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.1...

  5. Systems engineering management plans.

    SciTech Connect

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  6. Planning ATES systems under uncertainty

    NASA Astrophysics Data System (ADS)

    Jaxa-Rozen, Marc; Kwakkel, Jan; Bloemendal, Martin

    2015-04-01

    Aquifer Thermal Energy Storage (ATES) can contribute to significant reductions in energy use within the built environment, by providing seasonal energy storage in aquifers for the heating and cooling of buildings. ATES systems have experienced a rapid uptake over the last two decades; however, despite successful experiments at the individual level, the overall performance of ATES systems remains below expectations - largely due to suboptimal practices for the planning and operation of systems in urban areas. The interaction between ATES systems and underground aquifers can be interpreted as a common-pool resource problem, in which thermal imbalances or interference could eventually degrade the storage potential of the subsurface. Current planning approaches for ATES systems thus typically follow the precautionary principle. For instance, the permitting process in the Netherlands is intended to minimize thermal interference between ATES systems. However, as shown in recent studies (Sommer et al., 2015; Bakr et al., 2013), a controlled amount of interference may benefit the collective performance of ATES systems. An overly restrictive approach to permitting is instead likely to create an artificial scarcity of available space, limiting the potential of the technology in urban areas. In response, master plans - which take into account the collective arrangement of multiple systems - have emerged as an increasingly popular alternative. However, permits and master plans both take a static, ex ante view of ATES governance, making it difficult to predict the effect of evolving ATES use or climactic conditions on overall performance. In particular, the adoption of new systems by building operators is likely to be driven by the available subsurface space and by the performance of existing systems; these outcomes are themselves a function of planning parameters. From this perspective, the interactions between planning authorities, ATES operators, and subsurface conditions

  7. An automatic assembly planning system

    NASA Astrophysics Data System (ADS)

    Huang, Y. F.; Lee, C. S. G.

    An automatic assembly planning system which takes the CAD description of a product as input and automatically generates an assembly plan subject to the resource constraint of a given assembly cell is presented. The system improves the flexibility and productivity of flexible manufacturing systems and is composed of five modules: world database, simulated world model, knowledge acquisition mechanism, planning knowledge base, and assembly planner. The acquired knowledge forms the planning knowledge base. The simulated world model keeps track of the current state of the assembly world. In the initial state, all the components are separated, while in the final state, all the components are assembled. The assembly planner is made up of a set of production rules which models the effects of real assembly tasks. By repeatedly applying these production rules to the simulated world state, the planner transforms the initial state into the final state. The set of rules applied during this transformation process forms the assembly plan to actually assemble the product in the given assembly cell. Examples are given to illustrate the concepts in these five modules.

  8. Water resource management planning guide for Savannah River Plant

    SciTech Connect

    Hubbard, J.E.; Stephenson, D.E.; Steele, J.L. and Co., Aiken, SC . Savannah River Lab.); Gordon, D.E. and Co., Aiken, SC . Savannah River Plant)

    1988-10-01

    The Water Resource Management Planning Guide provides an outline for the development of a Savannah River Plant Water Resource Management Plan (WRMP) to protect, manage, and monitor the site's water resources. The management plan is based on three principle elements: (1) protection of the water quality, (2) management of the water quantity, and (3) monitoring of the water quality and quantity. The plan will assure that changes in water quality and quantity are identified and that corrective action is implemented as needed. In addition, water management activities within and between Savannah River Plant (SRP) organizations and departments will be coordinated to ensure the proper management of water resources. This document is intended as a guide to suggest goals and objectives that will provide a basis for the development of a water resource plan for SRP. Planning should be flexible rather than rigid, and the plan outlines in this document was prepared to be modified or updated as conditions necessitate. 16 refs., 12 figs.

  9. Mission planning for autonomous systems

    NASA Technical Reports Server (NTRS)

    Pearson, G.

    1987-01-01

    Planning is a necessary task for intelligent, adaptive systems operating independently of human controllers. A mission planning system that performs task planning by decomposing a high-level mission objective into subtasks and synthesizing a plan for those tasks at varying levels of abstraction is discussed. Researchers use a blackboard architecture to partition the search space and direct the focus of attention of the planner. Using advanced planning techniques, they can control plan synthesis for the complex planning tasks involved in mission planning.

  10. Planning Systems for Distributed Operations

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  11. The Statewide Plan for Computing Resources in Illinois Higher Education.

    ERIC Educational Resources Information Center

    Nyman, David F.; And Others

    The statewide plan for computing resources in Illinois higher education is presented in this document. Chapter 1 discusses the history of this plan encompassing the board of higher education involvement, State Government planning, legislative actions, plan development, and a prospectus. Chapter 2 presents the procedure used to produce this report.…

  12. Recommended Resources for Planning to Evaluate Program Improvement Efforts (Including the SSIP)

    ERIC Educational Resources Information Center

    National Center for Systemic Improvement at WestEd, 2015

    2015-01-01

    This document provides a list of recommended existing resources for state Part C and Part B 619 staff and technical assistance (TA) providers to utilize to support evaluation planning for program improvement efforts (including the State Systemic Improvement Plan, SSIP). There are many resources available related to evaluation and evaluation…

  13. Washington State hydropower development/resource protection plan. Draft 2

    SciTech Connect

    Not Available

    1992-01-01

    The purpose of the second draft plan is to meet the requirements of a comprehensive plan under the Federal Power Act. The Electric Consumers` Protection Act of 1986 clarified the meaning of Section 10(a) of the Federal Power Act concerning comprehensive plans and their effect on the Federal Energy Regulatory Commission (FERC) licensing process. The Act made explicit the right of a state or state resource agency to prepare a comprehensive plan for a ``waterway or waterways`` and to have this plan be given the consideration by FERC. In 1989, the Washington State Legislature passed comprehensive hydropower planning legislation, ``an act related to hydropower development/resource protection.`` The legislation directed the development of a state comprehensive hydropower plan to serve the broad public interest regarding development of cost-effective electricity and conservation of river- related environmental values. The second draft plan represents the work of the Washington State Energy Office; the Washington State Departments of Ecology, Fisheries, Wildlife, and Natural Resources; the Washington State Parks and Recreation Commission; and the Department of Community Development`s Office of Archaeology and Historic Preservation. The history and concept of a state hydropower comprehensive plan. The purpose, scope and methodology for developing the plan are outlined. A Washington State River Resource/Hydropower Database is described. An evaluation of Environmental values and Hydropower Development to include resource protection areas is presented. Finally, state agency permitting and planning processes for hydropower development and resource protection are described.

  14. Washington State hydropower development/resource protection plan

    SciTech Connect

    Not Available

    1992-01-01

    The purpose of the second draft plan is to meet the requirements of a comprehensive plan under the Federal Power Act. The Electric Consumers' Protection Act of 1986 clarified the meaning of Section 10(a) of the Federal Power Act concerning comprehensive plans and their effect on the Federal Energy Regulatory Commission (FERC) licensing process. The Act made explicit the right of a state or state resource agency to prepare a comprehensive plan for a waterway or waterways'' and to have this plan be given the consideration by FERC. In 1989, the Washington State Legislature passed comprehensive hydropower planning legislation, an act related to hydropower development/resource protection.'' The legislation directed the development of a state comprehensive hydropower plan to serve the broad public interest regarding development of cost-effective electricity and conservation of river- related environmental values. The second draft plan represents the work of the Washington State Energy Office; the Washington State Departments of Ecology, Fisheries, Wildlife, and Natural Resources; the Washington State Parks and Recreation Commission; and the Department of Community Development's Office of Archaeology and Historic Preservation. The history and concept of a state hydropower comprehensive plan. The purpose, scope and methodology for developing the plan are outlined. A Washington State River Resource/Hydropower Database is described. An evaluation of Environmental values and Hydropower Development to include resource protection areas is presented. Finally, state agency permitting and planning processes for hydropower development and resource protection are described.

  15. Human Resource Planning: Challenges for Industrial/Organizational Psychologists.

    ERIC Educational Resources Information Center

    Jackson, Susan E.; Schuler, Randall S.

    1990-01-01

    Describes activities that industrial/organizational psychologists engage in as they seek to improve the competitiveness of organizations through effective human resource planning. Presents a model for describing human resource short-term, intermediate-term, and long-term planning. (JS)

  16. Mobile systems capability plan

    SciTech Connect

    1996-09-01

    This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered.

  17. Treatment of Solar Generation in Electric Utility Resource Planning (Presentation)

    SciTech Connect

    Cory, K.; Sterling, J.; Taylor, M.; McLaren, J.

    2014-01-01

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. Through interviews and a questionnaire, the authors gathered information on utility supply planning and how solar is represented. Utilities were asked to provide their resource planning process details, key assumptions (e.g. whether DG is represented as supply or negative load), modeling methodology (e.g. type of risk analytics and candidate portfolio development), capacity expansion and production simulation model software, and solar project representation (project size, capacity value and integration cost adder). This presentation aims to begin the exchange of information between utilities, regulators and other stakeholders by capturing utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  18. Regional Technology Planning Workshop. Resource Manual, 1997.

    ERIC Educational Resources Information Center

    Technology & Innovations in Education, Rapid City, SD.

    This Technology & Innovations in Education (TIE) workshop was presented on April 24 and 25, 1997, in Denver, CO, to help participants gain a big picture perspective of technology planning and related issues, understand a model for sound, practical technology planning, build capacity for leading a local planning effort, engage in the steps of the…

  19. Forest Resource Management Plans--A Landowner-Oriented Approach.

    ERIC Educational Resources Information Center

    Straka, Thomas J.

    1993-01-01

    Describes a teaching approach that uses actual landowners and their forest lands to create real world management planning experiences for senior forestry students. Using land currently managed by natural resource professionals allows the instructor to compare student plans with professionally prepared plans. (MDH)

  20. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    SciTech Connect

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  1. Improving productivity and firm performance with enterprise resource planning

    NASA Astrophysics Data System (ADS)

    Beheshti, Hooshang M.; Beheshti, Cyrus M.

    2010-11-01

    Productivity is generally considered to be the efficient utilisation of organisational resources and is measured in terms of the efficiency of a worker, company or nation. Focusing on efficiency alone, however, can be harmful to the organisation's long-term success and competitiveness. The full benefits of productivity improvement measures are realised when productivity is examined from two perspectives: operational efficiency (output/input) of an individual worker or a business unit as well as performance (effectiveness) with regard to end user or customer satisfaction. Over the years, corporations have adopted new technology to integrate business activities in order to achieve both effectiveness and efficiency in their operations. In recent years, many firms have invested in enterprise resource planning (ERP) in order to integrate all business activities into a uniform system. The implementation of ERP enables the firm to reduce the transaction costs of the business and improve its productivity, customer satisfaction and profitability.

  2. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  3. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  4. Business System Planning Project, Preliminary System Design

    SciTech Connect

    EVOSEVICH, S.

    2000-10-30

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time.

  5. North Slope Decision Support for Water Resource Planning and Management

    SciTech Connect

    Schnabel, William; Brumbelow, Kelly

    2013-03-31

    The objective of this project was to enhance the water resource decision-making process with respect to oil and gas exploration/production activities on Alaska’s North Slope. To this end, a web-based software tool was developed to allow stakeholders to assemble, evaluate, and communicate relevant information between and amongst themselves. The software, termed North Slope Decision Support System (NSDSS), is a visually-referenced database that provides a platform for running complex natural system, planning, and optimization models. The NSDSS design was based upon community input garnered during a series of stakeholder workshops, and the end product software is freely available to all stakeholders via the project website. The tool now resides on servers hosted by the UAF Water and Environmental Research Center, and will remain accessible and free-of-charge for all interested stakeholders. The development of the tool fostered new advances in the area of data evaluation and decision support technologies, and the finished product is envisioned to enhance water resource planning activities on Alaska’s North Slope.

  6. Risk Analysis for Resource Planning Optimization

    NASA Technical Reports Server (NTRS)

    Chueng, Kar-Ming

    2008-01-01

    The main purpose of this paper is to introduce a risk management approach that allows planners to quantify the risk and efficiency tradeoff in the presence of uncertainties, and to make forward-looking choices in the development and execution of the plan. Demonstrate a planning and risk analysis framework that tightly integrates mathematical optimization, empirical simulation, and theoretical analysis techniques to solve complex problems.

  7. Application of the Water Evaluation and Planning (WEAP) System for Integrated Hydrologic and Scenario-based Water Resources Systems Modeling in the Western Sierra Nevada

    NASA Astrophysics Data System (ADS)

    Mehta, V. K.; Purkey, D. R.; Young, C.; Joyce, B.; Yates, D.

    2008-12-01

    Rivers draining western slopes of the Sierra Nevada provide critical water supply, hydropower, fisheries and recreation services to California. Coordinated efforts are under way to better characterize and model the possible impacts of climate change on Sierra Nevada hydrology. Research suggests substantial end-of- century reductions in Sierra Nevada snowpack and a shift in the center of mass of the snowmelt hydrograph. Management decisions, land use change and population growth add further complexity, necessitating the use of scenario-based modeling tools. The Water Evaluation and Planning (WEAP) system is one of the suite of tools being employed in this effort. Unlike several models that rely on perturbation of historical runoff data to simulate future climate conditions, WEAP includes a dynamically integrated watershed hydrology module that is forced by input climate time series. This allows direct simulation of water management response to climate and land use change. This paper presents ABY2008, a WEAP application for the Yuba, Bear and American River (ABY) watersheds of the Sierra Nevada. These rivers are managed by water agencies and hydropower utilities through a complex network of reservoirs, dams, hydropower plants and water conveyances. Historical watershed hydrology in ABY2008 is driven by a 10 year weekly climate time series from 1991-2000. Land use and soils data were combined into 12 landclasses representing each of 324 hydrological response units. Hydrologic parameters were incorporated from a calibration against observed streamflow developed for the entire western Sierra. Physical reservoir data, operating rules, and water deliveries to water agencies were obtained from public documents of water agencies and power utilities that manage facilities in the watersheds. ABY2008 includes 25 major reservoirs, 39 conveyances, 33 hydropower plants and 14 transmission links to 13 major water demand points. In WEAP, decisions for transferring water at

  8. [Remote radiation planning support system].

    PubMed

    Atsumi, Kazushige; Nakamura, Katsumasa; Yoshidome, Satoshi; Shioyama, Yoshiyuki; Sasaki, Tomonari; Ohga, Saiji; Yoshitake, Tadamasa; Shinoto, Makoto; Asai, Kaori; Sakamoto, Katsumi; Hirakawa, Masakazu; Honda, Hiroshi

    2012-08-01

    We constructed a remote radiation planning support system between Kyushu University Hospital (KUH) in Fukuoka and Kyushu University Beppu Hospital (KBH) in Oita. Between two institutions, radiology information system for radiotherapy division (RT-RIS) and radiation planning system (RTPS) were connected by virtual private network (VPN). This system enables the radiation oncologists at KUH to perform radiotherapy planning for the patients at KBH. The detail of the remote radiation planning support system in our institutions is as follows: The radiation oncologist at KBH performs radiotherapy planning and the data of the patients are sent anonymously to the radiation oncologists at KUH. The radiation oncologists at KUH receive the patient's data, access to RTPS at KBH, verify or change the radiation planning at KBH: Radiation therapy is performed at KBH according to the confirmed plan by the radiation oncologists at KUH. Our remote radiation planning system is useful for providing radiation therapy with safety and accuracy. PMID:23157128

  9. Treatment of Solar Generation in Electric Utility Resource Planning

    SciTech Connect

    Sterling, J.; McLaren, J.; Taylor, M.; Cory, K.

    2013-10-01

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  10. Planning and Cooperative Use of Resources for the Arts.

    ERIC Educational Resources Information Center

    National Endowment for the Arts, Washington, DC.

    The arts are facing an "arts population explosion" at a time when resources and capital are becoming tighter by the day. This pamphlet describes cooperative planning and gives examples of joint use of resources to help arts organizations and institutions know what they are about, where they are going, how they will get there, and with whom they…

  11. Puerto Rico water resources planning model program description

    USGS Publications Warehouse

    Moody, D.W.; Maddock, Thomas; Karlinger, M.R.; Lloyd, J.J.

    1973-01-01

    Because the use of the Mathematical Programming System -Extended (MPSX) to solve large linear and mixed integer programs requires the preparation of many input data cards, a matrix generator program to produce the MPSX input data from a much more limited set of data may expedite the use of the mixed integer programming optimization technique. The Model Definition and Control Program (MODCQP) is intended to assist a planner in preparing MPSX input data for the Puerto Rico Water Resources Planning Model. The model utilizes a mixed-integer mathematical program to identify a minimum present cost set of water resources projects (diversions, reservoirs, ground-water fields, desalinization plants, water treatment plants, and inter-basin transfers of water) which will meet a set of future water demands and to determine their sequence of construction. While MODCOP was specifically written to generate MPSX input data for the planning model described in this report, the program can be easily modified to reflect changes in the model's mathematical structure.

  12. Funding the Plan: Integration of Strategic Planning and Resource Allocation

    ERIC Educational Resources Information Center

    Pagel, Richard T.

    2011-01-01

    California Community Colleges are facing increased accountability while at the same time experiencing reduced and uncertain state funding. When resources are not properly allocated there is waste, public criticism, and ultimately increased oversight. A review of the Accrediting Commission for Community and Junior Colleges (ACCJC) sanction letters…

  13. Spotsylvania County Intermediate Schools Resource Notebook. Career Education Lesson Plans.

    ERIC Educational Resources Information Center

    Spotsylvania County Public Schools, VA.

    This resource notebook contains lesson plans for use in providing career education to students in grades 6, 7, and 8. Lessons plans are organized into sections addressing the following subject areas: language arts and foreign language, reading, mathematics, science, social studies, health and physical education, special education, and fine arts…

  14. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING,...

  15. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... provided in 40 CFR 1502.6. The disciplines of the preparers shall be appropriate to the values involved and... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management planning guidance... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING,...

  16. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... provided in 40 CFR 1502.6. The disciplines of the preparers shall be appropriate to the values involved and... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning guidance... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING,...

  17. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... provided in 40 CFR 1502.6. The disciplines of the preparers shall be appropriate to the values involved and... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning guidance... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING,...

  18. Forest resource information system

    NASA Technical Reports Server (NTRS)

    Mroczynski, R. P. (Principal Investigator)

    1978-01-01

    The author has identified the following significant results. A benchmark classification evaluation framework was implemented. The FRIS preprocessing activities were refined. Potential geo-based referencing systems were identified as components of FRIS.

  19. Water Resources Planning under Uncertainty: A "Real Options" Approach

    NASA Astrophysics Data System (ADS)

    Jeuland, M. A.; Whittington, D.

    2011-12-01

    This research develops a real options approach for planning new water resources developments, in infrastructure construction and system operation, under uncertainty. The approach treats the planning problem as a series of staged decisions - the selection of new projects; their scale, timing and sequencing; and finally their operating rules - each of which is characterized by varying levels of irreversibility. The performance of different configurations of the system is then assessed along the various dimensions of the decision space, using simulation methods. The methodology is then made operational using an existing hydrological simulation model that can be used to study the example of hydropower development options in the Blue Nile in Ethiopia. The model includes physical linkages between climate change and system hydrology, and allows users to test the sensitivity of the basin-wide economic consequences of dams, which consist of energy generation, changes in irrigation crop-water demand, the value of flood control, and other basin-wide impacts, to climate change or changes in runoff, as well as to other uncertainties. The analysis shows that, from an economic perspective, there is no single optimal system configuration across a range of future climate conditions deemed plausible for this basin. For example, small infrastructures perform best in scenarios with reduced runoff into the river, whereas large ones are best when runoff increases. The real options framework therefore becomes useful for helping to identify configurations that are both more robust to poor outcomes and still contain sufficient flexibility to capture high upside benefits should favorable future conditions arise. The framework could readily be extended to explore a range of features that could be usefully built into water resources projects more generally, to improve the long-term economic performance of such investments.

  20. Department of Energy Resource Assessment Program 5-year plan, FY 1991--FY 1995

    SciTech Connect

    Not Available

    1990-10-01

    The US Department of Energy's (DOE) Resource Assessment Program produces scientific descriptions and assessments of the nation's renewable energy resources, such as solar energy. Information about the resources --- for example, how solar energy varies with location and climate --- is required to develop energy conversion technologies, design and site systems, and forecast the systems' performance. With information about resource availability and renewable energy system performance, DOE can assess the potential for renewable energy to contribute to the nation's energy supply as part of the long-term national energy strategy. This 5-year plan for fiscal years (FY) 1991 through 1995 gives the strategy to produce solar radiation resource characterizations and assessments under the DOE project at SERI. It is consistent with the mini-multiyear plan for resource assessment prepared by DOE in 1989 and incorporates the comments received at a project overview held in April 1990 at DOE Headquarters. 7 figs.

  1. Natural Resource Management Plan for Brookhaven National Laboratory

    SciTech Connect

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  2. A System for Planning Ahead

    NASA Technical Reports Server (NTRS)

    2002-01-01

    A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.

  3. Dynamic resource allocation in conservation planning

    USGS Publications Warehouse

    Golovin, D.; Krause, A.; Gardner, B.; Converse, S.J.; Morey, S.

    2011-01-01

    Consider the problem of protecting endangered species by selecting patches of land to be used for conservation purposes. Typically, the availability of patches changes over time, and recommendations must be made dynamically. This is a challenging prototypical example of a sequential optimization problem under uncertainty in computational sustainability. Existing techniques do not scale to problems of realistic size. In this paper, we develop an efficient algorithm for adaptively making recommendations for dynamic conservation planning, and prove that it obtains near-optimal performance. We further evaluate our approach on a detailed reserve design case study of conservation planning for three rare species in the Pacific Northwest of the United States. Copyright ?? 2011, Association for the Advancement of Artificial Intelligence. All rights reserved.

  4. A fractional-factorial probabilistic-possibilistic optimization framework for planning water resources management systems with multi-level parametric interactions.

    PubMed

    Wang, S; Huang, G H; Zhou, Y

    2016-05-01

    In this study, a multi-level factorial-vertex fuzzy-stochastic programming (MFFP) approach is developed for optimization of water resources systems under probabilistic and possibilistic uncertainties. MFFP is capable of tackling fuzzy parameters at various combinations of α-cut levels, reflecting distinct attitudes of decision makers towards fuzzy parameters in the fuzzy discretization process based on the α-cut concept. The potential interactions among fuzzy parameters can be explored through a multi-level factorial analysis. A water resources management problem with fuzzy and random features is used to demonstrate the applicability of the proposed methodology. The results indicate that useful solutions can be obtained for the optimal allocation of water resources under fuzziness and randomness. They can help decision makers to identify desired water allocation schemes with maximized total net benefits. A variety of decision alternatives can also be generated under different scenarios of water management policies. The findings from the factorial experiment reveal the interactions among design factors (fuzzy parameters) and their curvature effects on the total net benefit, which are helpful in uncovering the valuable information hidden beneath the parameter interactions affecting system performance. A comparison between MFFP and the vertex method is also conducted to demonstrate the merits of the proposed methodology. PMID:26922500

  5. On-Line Allocation Of Robot Resources To Task Plans

    NASA Astrophysics Data System (ADS)

    Lyons, Damian M.

    1989-02-01

    In this paper, I present an approach to representing plans that make on-line decisions about resource allocation. An on-line decision is the evaluation of a conditional expression involving sensory information as the plan is being executed. I use a plan representation called 7ZS10'1 1,12that has been especially designed for the domain of robot programming, and in particular, for the problem of on-line decisions. The resource allocation example is based on the robot assembly cell architecture outlined by Venkataraman and Lyons16. I begin by setting forth a definition of on-line decision making and some arguments as to why this form of decision making is important and useful. To set the context for the resource allocation example, I take some care in categorizing the types of on-line decision making and the approaches adopted by other workers so far. In particular, I justify a plan-based approach to the study of on-line decision making. From that, the focus shifts to one type of decision making: on-line allocation of robot resources to task plans. Robot resources are the physical manipulators (grippers, wrists, arms, feeders, etc) that are available to carry out the task. I formulate the assembly cell architecture of Venkataraman and Lyons16 as an R.S plan schema, and show how the on-line allocation specified in that architecture can be implemented. Finally, I show how considering the on-line allocation of logical resources, that is a physical resource plus some model information, can be used as a non-traditional approach to some problems in robot task planning.

  6. Transmission planning in the era of integrated resource planning: A survey of recent cases

    SciTech Connect

    Baldick, R.; Kahn, E.P.

    1992-09-01

    State action is critical to the expansion of the high-voltage transmission network, because regulated utilities must seek approval from utility commissions for proposals to site new lines. It is the purpose of this report to survey the regulatory treatment of issues that are unique to or ubiquitous in transmission planning and use. The authors review recent transmission siting cases to examine how the issues are presented to and resolved by state regulatory commissions and to provide a perspective for more general discussion of transmission policy. Their primary focus is on planning issues. Transmission capacity expansion is not typically treated in integrated resource planning. It is usually assumed that there is adequate transmission to achieve any particular plan. The authors believe that one important reason for this omission is the inherent complexity of transmission system expansion. Regulators and competitors may be at a serious disadvantage in negotiating or adjudicating specific transmission proposals with utilities, who generally have greater knowledge of both general technological considerations and case specifics. This problem of asymmetric information must be addressed at some level in planning or dispute resolution. However, they observe that explicit consideration of the information problem is absent from most regulatory and technical analysis of transmission. The goal of this survey is to share knowledge about the problems facing state regulators over the siting of new transmission facilities, and help to define constructive approaches to them.

  7. NASDA knowledge-based network planning system

    NASA Technical Reports Server (NTRS)

    Yamaya, K.; Fujiwara, M.; Kosugi, S.; Yambe, M.; Ohmori, M.

    1993-01-01

    One of the SODS (space operation and data system) sub-systems, NP (network planning) was the first expert system used by NASDA (national space development agency of Japan) for tracking and control of satellite. The major responsibilities of the NP system are: first, the allocation of network and satellite control resources and, second, the generation of the network operation plan data (NOP) used in automated control of the stations and control center facilities. Up to now, the first task of network resource scheduling was done by network operators. NP system automatically generates schedules using its knowledge base, which contains information on satellite orbits, station availability, which computer is dedicated to which satellite, and how many stations must be available for a particular satellite pass or a certain time period. The NP system is introduced.

  8. Energy Efficiency in Western Utility Resource Plans: Impacts onRegional Resources Assessment and Support for WGA Policies

    SciTech Connect

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-08-01

    In the aftermath of the consumer price shocks and short-term power shortages of the 2000-01 electricity crisis, policymakers and regulators in Western states are placing increased emphasis on integrated resource planning (IRP), resource adequacy and assessment and a diversified portfolio of resources to meet the needs of electricity consumers. In some states, this has led to a resurgence in state and utility commitments to energy efficiency. Increasing interest in acquiring energy efficiency as a power-system resource is also driven by the desire to dampen high growth rates in electricity demand in some Western states, rapid increases in natural gas prices, concerns about the environmental impacts of electricity generation (e.g. water consumption by power plants, air quality), and the potential of energy efficiency to provide utility bill savings for households and businesses (WGA CDEAC 2006). Recognizing the cost-competitiveness and environmental benefits of energy efficiency, the Western Governor's Association (WGA) has set a high priority for energy efficiency, establishing a goal of reducing projected electricity demand by 20% across the West by 2020 in a policy resolution on Clean and Diversified Energy for the West (WGA 2004). Nationally, the need for improved tracking of demand-side resources in load forecasting is formalized in the North American Electric Reliability Council (NERC)'s recently adopted reliability standards, which utilities and regional reliability organizations will need to comply with (NERC 2005a and 2005b). In this study, we examine the treatment of energy efficiency in recent resource plans issued by fourteen investor-owned utilities (IOUs) in the Western United States and Canada. The goals of this study are to: (1) summarize energy-efficiency resources as represented in a large sample of recent resource plans prepared by Western utilities and identify key issues; (2) evaluate the extent to which the information provided in current

  9. Ouray Colorado resource characteristics and future plans

    SciTech Connect

    McCarthy, K.P.

    1981-10-01

    Ouray, Colorado, at 7800 feet, lies in a natural amphitheater in the northern portion of the San Juan Mountains. Mining and tourism are the primary industries; each fluctuating between boom or bust; mining erratically; tourism seasonally. The hot springs in the area average from 80/sup 0/ to 152/sup 0/F and discharge from 2 to 200 gallons per minute. The resource is probably associated with circulation along deep normal faults with a limestone aquifer dispersing the hot water. It is estimated that 2256 x 10/sup 11/ Btu's of geothermal energy are available in the area. The springs are used in a pool, and for space heating. An unsolicited proposal for additional resource assessment and engineering was rejected by DOE. An Appropriate Technology Small Grant was applied for, and an A and E subcontract is being applied for. Independent development is happening nearby in exploration drilling for space heating needs. The city will pursue a heating district scheme involving use of the pool spring, or drilling a well as funding dictates. The city has unique funding problems involving an unstable seasonal economy, desire to continue to maintain the hot springs pool, impatient citizenry, and nervous spa owners.

  10. A stochastic optimization approach for integrated urban water resource planning.

    PubMed

    Huang, Y; Chen, J; Zeng, S; Sun, F; Dong, X

    2013-01-01

    Urban water is facing the challenges of both scarcity and water quality deterioration. Consideration of nonconventional water resources has increasingly become essential over the last decade in urban water resource planning. In addition, rapid urbanization and economic development has led to an increasing uncertain water demand and fragile water infrastructures. Planning of urban water resources is thus in need of not only an integrated consideration of both conventional and nonconventional urban water resources including reclaimed wastewater and harvested rainwater, but also the ability to design under gross future uncertainties for better reliability. This paper developed an integrated nonlinear stochastic optimization model for urban water resource evaluation and planning in order to optimize urban water flows. It accounted for not only water quantity but also water quality from different sources and for different uses with different costs. The model successfully applied to a case study in Beijing, which is facing a significant water shortage. The results reveal how various urban water resources could be cost-effectively allocated by different planning alternatives and how their reliabilities would change. PMID:23552255

  11. HLW system plan - revision 2

    SciTech Connect

    Not Available

    1994-01-14

    The projected ability of the Tank Farm to support DWPF startup and continued operation has diminished somewhat since revision 1 of this Plan. The 13 month delay in DWPF startup, which actually helps the Tank Farm condition in the near term, was more than offset by the 9 month delay in ITP startup, the delay in the Evaporator startups and the reduction to Waste Removal funding. This Plan does, however, describe a viable operating strategy for the success of the HLW System and Mission, albeit with less contingency and operating flexibility than in the past. HLWM has focused resources from within the division on five near term programs: The three evaporator restarts, DWPF melter heatup and completion of the ITP outage. The 1H Evaporator was restarted 12/28/93 after a 9 month shutdown for an extensive Conduct of Operations upgrade. The 2F and 2H Evaporators are scheduled to restart 3/94 and 4/94, respectively. The RHLWE startup remains 11/17/97.

  12. Reconstitution planning: SPC final report 1424. [System Planning Corporation (SPC)

    SciTech Connect

    Not Available

    1992-06-01

    The Office of the Deputy Under Secretary of Defense for Policy ODUSD(P) tasked the University of California's Los Alamos National Laboratory (LANL) to conduct a study to determine and assess the requirements and options for maintaining and developing a flexible and sustainable reconstitution base over the long term. In support of that study effort, System Planning Corporation (SPC) working closely with ODUSD(P) staff, developed and demonstrated an analytic process for conducting DoD reconstitution planning analyses on a regular basis and as part of the DoD PPBS. Within ODUSD(P), this planning approach is often referred to generically as a capacity-driven'' planning approach. Under the SPC-developed planning approach, DoD components would develop and maintain a family of reconstitution plans organized hierarchically on the basis of broad equipment categories (i.e., aircraft, ships, tracked combat vehicles, missiles and space, and munitions). For each selected broad equipment category, the cognizant DoD component will develop a reconstitution planning document that addresses a 20-year planning horizon. The analytic process to be used in support of activation scheduling would consist of the following activities; Defining appropriate demand schedule(s) for providing reconstitution response options; Identifying a menu of programmatic options for satisfying the above demand schedule; Conducting sensitivity and cost analyses; Selecting a set of reconstitution program options; Integrating and summarizing in a comprehensive, Department-wide manner reconstitution program options for all reconstitution plans; Developing and issuing planning guidance to DoD components; Estimating and projecting needed budgetary resources; Defending selected reconstitution programs throughout the PPBS process and Congressional budget process.

  13. UAVSAR Flight-Planning System

    NASA Technical Reports Server (NTRS)

    2008-01-01

    A system of software partly automates planning of a flight of the Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) -- a polarimetric synthetic-aperture radar system aboard an unpiloted or minimally piloted airplane. The software constructs a flight plan that specifies not only the intended flight path but also the setup of the radar system at each point along the path.

  14. FY 1991--FY 1995 Information Technology Resources Long-Range Plan

    SciTech Connect

    Not Available

    1989-12-01

    The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.

  15. Resource Constrained Planning of Multiple Projects with Separable Activities

    NASA Astrophysics Data System (ADS)

    Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya

    In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.

  16. Geothermal resource area 9: Nye County. Area development plan

    SciTech Connect

    Pugsley, M.

    1981-01-01

    Geothermal Resource area 9 encompasses all of Nye County, Nevada. Within this area there are many different known geothermal sites ranging in temperature from 70/sup 0/ to over 265/sup 0/ F. Fifteen of the more major sites have been selected for evaluation in this Area Development Plan. Various potential uses of the energy found at each of the resource sites discussed in this Area Development Plan were determined after evaluating the area's physical characteristics, land ownership and land use patterns, existing population and projected growth rates, and transportation facilities, and comparing those with the site specific resource characteristics. The uses considered were divided into five main categories: electrical generation, space heating, recreation, industrial process heat, and agriculture. Within two of these categories certain subdivisions were considered separately. The findings about each of the 15 geothermal sites considered in this Area Development Plan are summarized.

  17. Multicriteria methods for resource planning: An experimental comparison

    SciTech Connect

    Hobbs, B.F. . Dept. of Systems Engineering); Meier, P.M. )

    1994-11-01

    Multicriteria decision making (MCDM) methods are widely used for comparing alternatives when there are multiple objectives. For instance, utilities use them for resource bidding, externality quantification, facility siting, and resource planning. There are many alternative methods, differing in their ease of use, validity, results, and appropriateness to resource planning. Several MCDM methods are compared in an experiment involving the choice of resource portfolio for Seattle City Light. Planners and interest group representatives applied direct weight assessment, tradeoff weight assessment, additive value functions, and goal programming. Most of the participants concluded that MCDM methods could promote insight and confidence in decision making. However, they also confirmed the existence of method biases previously identified by psychologists. No single method emerged as best. Thus, application of two or more methods as consistency checks is recommended to guard against bias, and to stimulate insight.

  18. Value of Landsat in urban water resources planning

    NASA Technical Reports Server (NTRS)

    Jackson, T. J.; Ragan, R. M.

    1977-01-01

    The reported investigation had the objective to evaluate the utility of satellite multispectral remote sensing in urban water resources planning. The results are presented of a study which was conducted to determine the economic impact of Landsat data. The use of Landsat data to estimate hydrologic model parameters employed in urban water resources planning is discussed. A decision regarding an employment of the Landsat data has to consider the tradeoff between data accuracy and cost. Bayesian decision theory is used in this connection. It is concluded that computer-aided interpretation of Landsat data is a highly cost-effective method of estimating the percentage of impervious area.

  19. Lewin's Theory of Planned Change as a strategic resource.

    PubMed

    Shirey, Maria R

    2013-02-01

    This department highlights change management strategies that may be successful in strategically planning and executing organizational change initiatives. With the goal of presenting practical approaches helpful to nurse leaders advancing organizational change, content includes evidence-based projects, tools, and resources that mobilize and sustain organizational change initiatives. In this article, the author explores the use of the Lewin's Theory of Planned Change as a strategic resource to mobilize the people side of change. An overview of the theory is provided along with a discussion of its strengths, limitations, and targeted application. PMID:23343723

  20. ANL site response for the DOE FY1994 information resources management long-range plan

    SciTech Connect

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  1. ANL site response for the DOE FY1994 information resources management long-range plan

    SciTech Connect

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  2. Human Resources Staffing Plan for the Tank Farm Contractor

    SciTech Connect

    BOSLEY, J.W.

    2000-04-22

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline.

  3. 43 CFR 1610.4-8 - Selection of resource management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Selection of resource management plan..., BUDGETING Resource Management Planning § 1610.4-8 Selection of resource management plan. After publication of the draft resource management plan and draft environmental impact statement, the Field...

  4. 43 CFR 1610.4-8 - Selection of resource management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Selection of resource management plan..., BUDGETING Resource Management Planning § 1610.4-8 Selection of resource management plan. After publication of the draft resource management plan and draft environmental impact statement, the Field...

  5. RIMS: Resource Information Management System

    NASA Technical Reports Server (NTRS)

    Symes, J.

    1983-01-01

    An overview is given of the capabilities and functions of the resource management system (RIMS). It is a simple interactive DMS tool which allows users to build, modify, and maintain data management applications. The RIMS minimizes programmer support required to develop/maintain small data base applications. The RIMS also assists in bringing the United Information Services (UIS) budget system work inhouse. Information is also given on the relationship between the RIMS and the user community.

  6. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  7. Geothermal resource area 3: Elko County. Area development plan

    SciTech Connect

    Pugsley, M.

    1981-01-01

    Geothermal Resource Area 3 includes all of the land in Elko County, Nevada. There are in excess of 50 known thermal anomalies in this area. Several of the more major resources have been selected for detailed description and evaluation in this Area Development Plan. The other resources are considered too small, too low in temperature, or too remote to be considered for development in the near future. Various potential uses of the energy found at each of the studied resource sites in Elko County were determined after evaluating the area's physical characteristics; the land ownership and land use patterns; existing population and projected growth rates; transportation facilities and energy requirements. These factors were then compared with resource site specific data to determine the most likely uses of the resource. The uses considered in this evaluation were divided into five main categories: electrical generation, space heating, recreation, industrial process heat, and agriculture. Within two of these categories several subdivisions were considered separately. It was determined that several of the geothermal resources evaluated in the Area Development Plan could be commercially developed. The potential for development for the seven sites considered in this study is summarized.

  8. NASA plans for future earth resources missions

    NASA Technical Reports Server (NTRS)

    Nordberg, W.

    1975-01-01

    Development activities underway to improve LANDSAT sensors and observing systems are reported. Data cover high resolution imagery of surface temperatures for improving crop and other vegetation and soil classifications, and heat capacity mapping for recording surface temperatures at hours of maximum and minimum heating. Automatic identification and classification methods designed to extract information such as crop and forage acreages, amounts of water run-off, and types of land use directly from the satellite observations were also studied. A number of applications verification tests were conducted, particularly in the areas of crop and land use inventory and water run-off prediction, to demonstrate the direct transfer of space acquired information to end users.

  9. M.A.P.S.: Mesa Action Planning System.

    ERIC Educational Resources Information Center

    Larson, Elizabeth J. Hunt

    This report describes implementation of a districtwide planning model in the Mesa, Arizona, Public Schools. Figures illustrate planning processes throughout the report. Intended as an implementive framework, the planning system's purposes are to assist decision making about resource allocation, program direction, progress measurement, and district…

  10. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR... education opportunities and stewardship; and (5) provide updated management direction for establishing a new... Bureau of Reclamation Resource Management Plan/General Plan and Environmental Impact...

  11. Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study

    ERIC Educational Resources Information Center

    Battleson, Douglas Aloys

    2013-01-01

    Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…

  12. Health Personnel Resource Plan. 1993-95 Biennium.

    ERIC Educational Resources Information Center

    Washington State Dept. of Social and Health Services, Olympia.

    The 1993-95 Health Personnel Resource Plan (HPRP) for the state of Washington identifies health professions shortages and suggests activities to alleviate these shortages. Its components are as follows: assessment of health personnel supply and requirements; cooperation among governments and organizations; service delivery by a mix of providers;…

  13. Coordination and Human Resource Planning in the Hawaii Visitor Industry.

    ERIC Educational Resources Information Center

    Hawaii State Commission on Manpower and Full Employment, Honolulu.

    This report was undertaken in response to a request by the Sixth Legislature, which expressed its concern with the lack of coordination and overall human resource planning in the visitor industry and that the findings of the January 6-7, 1970 Travel Industry Congress had not been fully implemented. The State Commission on Manpower and Full…

  14. Planning a Natural Resource Program for a Local Ag Department

    ERIC Educational Resources Information Center

    Wilmot, Lee; Tulloch, Rodney

    1975-01-01

    On-the-job training with the U. S. Forest Service provides teachers in Kentucky with first hand knowledge of the competencies they will need to pass on to those of their students who are planning on natural resource, recreation, and forestry-related occupations. (SA)

  15. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  16. Planning health care delivery systems.

    PubMed Central

    Baum, M A; Bergwall, D F; Reeves, P N

    1975-01-01

    The increasing concern and interest in the health delivery system in the United States has placed the health system planners in a difficult position. They are inadequately prepared, in many cases, to deal with the management techniques that have been designed for use with system problems. This situation has been compounded by the failure, until recently, of educational programs to train new health professionals in these techniques. Computer simulation is a technique that allows the planners dynamic feedback on his proposed plans. This same technique provides the planning student with a better understanding of the systems planning process. PMID:1115292

  17. Resource Requirements Planning for Hospitals Treating Serious Infectious Disease Cases.

    SciTech Connect

    Vugrin, Eric D.; Verzi, Stephen Joseph; Finley, Patrick D.; Turnquist, Mark A.; Wyte-Lake, Tamar; Griffin, Ann R.; Ricci, Karen J.; Plotinsky, Rachel

    2015-02-01

    This report presents a mathematical model of the way in which a hospital uses a variety of resources, utilities and consumables to provide care to a set of in-patients, and how that hospital might adapt to provide treatment to a few patients with a serious infectious disease, like the Ebola virus. The intended purpose of the model is to support requirements planning studies, so that hospitals may be better prepared for situations that are likely to strain their available resources. The current model is a prototype designed to present the basic structural elements of a requirements planning analysis. Some simple illustrati ve experiments establish the mo del's general capabilities. With additional inve stment in model enhancement a nd calibration, this prototype could be developed into a useful planning tool for ho spital administrators and health care policy makers.

  18. Human resource information systems: helping to meet Section 89 requirements.

    PubMed

    Spirig, J E

    1989-01-01

    After January 1, 1989, firms offering comprehensive benefits plans to employees must demonstrate that such plans do not discriminate against non-highly compensated workers. This article presents human resource information systems as a solution to Section 89 compliance problems and suggests integrating benefits and payroll information. PMID:10295776

  19. Translating Strategic Planning for Information Resources into Ongoing Management.

    ERIC Educational Resources Information Center

    Penrod, James I.; Douglas, Judith V.

    1987-01-01

    With funding from the National Library of Medicine, the University of Maryland at Baltimore instituted a formal strategic planning process for an integrated academic information management system. A general model for organizational change is applied to the situation, with references to the literature on systems models and formal planning. (MLW)

  20. Integrating Enterprise Resource Planning (SAP) in the Accounting Curriculum: A Systematic Literature Review and Case Study

    ERIC Educational Resources Information Center

    Blount, Yvette; Abedin, Babak; Vatanasakdakul, Savanid; Erfani, Seyedezahra

    2016-01-01

    This study investigates how an enterprise resource planning (ERP) software package SAP was integrated into the curriculum of an accounting information systems (AIS) course in an Australian university. Furthermore, the paper provides a systematic literature review of articles published between 1990 and 2013 to understand how ERP systems were…

  1. Drivers and Effects of Enterprise Resource Planning Post-Implementation Learning

    ERIC Educational Resources Information Center

    Chang, Hsiu-Hua; Chou, Huey-Wen

    2011-01-01

    The use of enterprise resource planning (ERP) systems has grown enormously since 1990, but the failure to completely learn how to use them continues to produce disappointing results. Today's rapidly changing business environment and the integrative applications of ERP systems force users to continuously learn new skills after ERP implementation.…

  2. Resource planning for gas utilities: Using a model to analyze pivotal issues

    SciTech Connect

    Busch, J.F.; Comnes, G.A.

    1995-11-01

    With the advent of wellhead price decontrols that began in the late 1970s and the development of open access pipelines in the 1980s and 90s, gas local distribution companies (LDCs) now have increased responsibility for their gas supplies and face an increasingly complex array of supply and capacity choices. Heretofore this responsibility had been share with the interstate pipelines that provide bundled firm gas supplies. Moreover, gas supply an deliverability (capacity) options have multiplied as the pipeline network becomes increasing interconnected and as new storage projects are developed. There is now a fully-functioning financial market for commodity price hedging instruments and, on interstate Pipelines, secondary market (called capacity release) now exists. As a result of these changes in the natural gas industry, interest in resource planning and computer modeling tools for LDCs is increasing. Although in some ways the planning time horizon has become shorter for the gas LDC, the responsibility conferred to the LDC and complexity of the planning problem has increased. We examine current gas resource planning issues in the wake of the Federal Energy Regulatory Commission`s (FERC) Order 636. Our goal is twofold: (1) to illustrate the types of resource planning methods and models used in the industry and (2) to illustrate some of the key tradeoffs among types of resources, reliability, and system costs. To assist us, we utilize a commercially-available dispatch and resource planning model and examine four types of resource planning problems: the evaluation of new storage resources, the evaluation of buyback contracts, the computation of avoided costs, and the optimal tradeoff between reliability and system costs. To make the illustration of methods meaningful yet tractable, we developed a prototype LDC and used it for the majority of our analysis.

  3. Water Resources System Archetypes: Towards a Holistic Understanding of Persistent Water Resources Problems

    NASA Astrophysics Data System (ADS)

    Mirchi, A.; Watkins, D. W.; Madani, K.

    2011-12-01

    Water resources modeling, a well-established tool in water resources planning and management practice, facilitates understanding of the physical and socio-economic processes impacting the wellbeing of humans and ecosystems. While watershed models continue to become more holistic, there is a need for appropriate frameworks and tools for integrated conceptualization of problems to provide reliable qualitative and quantitative bases for policy selection. In recent decades, water resources professionals have become increasingly cognizant of important feedback relationships within water resources systems. We contend that a systems thinking paradigm is required to facilitate characterization of the closed-loop nature of these feedbacks. Furthermore, a close look at different water resources issues reveals that, while many water resources problems are essentially very similar in nature, they continuously appear in different geographical locations. In the systems thinking literature, a number of generic system structures known as system archetypes have been identified to describe common patterns of problematic behavior within systems. In this research, we identify some main system archetypes governing water resources systems, demonstrating their benefits for holistic understanding of various classes of persistent water resources problems. Using the eutrophication problem of Lake Allegan, Michigan, as a case study, we illustrate how the diagnostic tools of system dynamics modeling can facilitate identification of problematic feedbacks within water resources systems and provide insights for sustainable development.

  4. Comparative evaluation of ERTS-A imagery for resource inventory in land-use planning

    NASA Technical Reports Server (NTRS)

    Simonson, G. H. (Principal Investigator)

    1972-01-01

    There are no author-identified significant results in this report. The overall objectives of this program are: (1) use of multidiscipline team approach to determine features that can be successfully monitored by ERTS-1 imagery for resource inventory, planning, land use zoning, and resource development; and (2) using carefully selected sample areas, develop a comprehensive resource inventory mapping system for use in planning, zoning, and resource development. Progress has included compilation and organization of ground truth data and observations in the primary study area of Crook County; resource inventory legend development; assembly and testing of color enhancement equipment; development and adaption of programs for digital data processing; and quick-look evaluations of initial ERTS-1 imagery for Oregon.

  5. Research and Development Program Plan for Geopressure-Geothermal Resources

    SciTech Connect

    1980-12-01

    The objective of the Geopressure-Geothermal Program of the Division of Geothermal Energy, U.S. Department of Energy, is to determine by the end of FY86 the magnitude and economic potential of the geopressure-geothermal resources. This Program Plan describes how the Department of Energy proposes to achieve this objective. The main purposes of the current program are to narrow the range of uncertainty on the potential recovery of energy from the geopressure-geothermal resources and to ensure the timely development of these resources as the potential is demonstrated. For these purposes, the Division of Geothermal Energy has established the following objectives: (1) Define the magnitude, potential, and economics of the resources. (2) Conduct supporting research on reservoir and fluid characteristics. (3) Adapt or develop downhole, surface, and disposal technology. (4) Identify and mitigate adverse environmental, legal, and institutional issues in order to promote commercialization.

  6. PST and PARR: Plan specification tools and a planning and resource reasoning shell for use in satellite mission planning

    NASA Technical Reports Server (NTRS)

    Mclean, David; Yen, Wen

    1989-01-01

    Plan Specification Tools (PST) are tools that allow the user to specify satellite mission plans in terms of satellite activities, relevent orbital events, and targets for observation. The output of these tools is a set of knowledge bases and environmental events which can then be used by a Planning And Resource Reasoning (PARR) shell to build a schedule. PARR is a reactive planning shell which is capable of reasoning about actions in the satellite mission planning domain. Each of the PST tools and PARR are described as well as the use of PARR for scheduling computer usage in the multisatellite operations control center at Goddard Space Flight Center.

  7. Scale and modeling issues in water resources planning

    USGS Publications Warehouse

    Lins, H.F.; Wolock, D.M.; McCabe, G.J.

    1997-01-01

    Resource planners and managers interested in utilizing climate model output as part of their operational activities immediately confront the dilemma of scale discordance. Their functional responsibilities cover relatively small geographical areas and necessarily require data of relatively high spatial resolution. Climate models cover a large geographical, i.e. global, domain and produce data at comparatively low spatial resolution. Although the scale differences between model output and planning input are large, several techniques have been developed for disaggregating climate model output to a scale appropriate for use in water resource planning and management applications. With techniques in hand to reduce the limitations imposed by scale discordance, water resource professionals must now confront a more fundamental constraint on the use of climate models-the inability to produce accurate representations and forecasts of regional climate. Given the current capabilities of climate models, and the likelihood that the uncertainty associated with long-term climate model forecasts will remain high for some years to come, the water resources planning community may find it impractical to utilize such forecasts operationally.

  8. Choosing options. [Integrated resource planning meets decision analysis

    SciTech Connect

    Borison, A. ); Balachandran, G. )

    1992-12-15

    Integrated resource planning (IRP) is becoming an important part of the electric power industry. Defined as the systematic evaluation of resource options for meeting the needs of electric utility customers, IRP originally focused on demand-side management, putting it on an equal footing with power generation. Over time, however, IRP began to take on a strong environmental emphasis as well. That meant that in addition to more traditional economic and engineering criteria, social and environmental factors were to be considered explicitly in evaluating resource options. Recently, a new wrinkle has been added to IRP. The concept now means that uncertainties in the planning environment must be recognized explicitly, and the full range of potential future scenarios are to be considered. Given its evolution, if IRP is to constitute state-of-the-art electric utility planning it must consider: (1) the full range of resource options, both demand- and supply side; (2) the full range of effects, including economic, engineering and environmental and social; and (3) the full range of future scenarios, including nominal as well as worst case and best cast conditions.

  9. Disaster and Contingency Planning for Scientific Shared Resource Cores.

    PubMed

    Mische, Sheenah; Wilkerson, Amy

    2016-04-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores ("cores") to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution's overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy. PMID:26848285

  10. Disaster and Contingency Planning for Scientific Shared Resource Cores

    PubMed Central

    Wilkerson, Amy

    2016-01-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores (“cores”) to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution’s overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy. PMID:26848285

  11. Resource Management for Distributed Parallel Systems

    NASA Technical Reports Server (NTRS)

    Neuman, B. Clifford; Rao, Santosh

    1993-01-01

    Multiprocessor systems should exist in the the larger context of distributed systems, allowing multiprocessor resources to be shared by those that need them. Unfortunately, typical multiprocessor resource management techniques do not scale to large networks. The Prospero Resource Manager (PRM) is a scalable resource allocation system that supports the allocation of processing resources in large networks and multiprocessor systems. To manage resources in such distributed parallel systems, PRM employs three types of managers: system managers, job managers, and node managers. There exist multiple independent instances of each type of manager, reducing bottlenecks. The complexity of each manager is further reduced because each is designed to utilize information at an appropriate level of abstraction.

  12. Information Systems for University Planning.

    ERIC Educational Resources Information Center

    Robinson, Robert J.

    This paper proposes construction of a separate data base environment for university planning information, distinct from data bases and systems supporting operational functioning and management. The data base would receive some of its input from the management information systems (MIS)/transactional data bases and systems through a process of…

  13. Planning-Programming-Budgeting Systems.

    ERIC Educational Resources Information Center

    Tudor, Dean

    Planning Programming and Budgeting Systems (PPBS) have been considered as either synonymous with abstract, advanced, mathematical systems analysis or as an advanced accounting and control system. If PPBS is to perform a useful function, both viewpoints must be combined such that a number of standardized procedures and reports are required and…

  14. Nascom System Development Plan: System Description, Capabilities and Plans

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The NASA Communications (Nascom) System Development Plan (NSDP), reissued annually, describes the organization of Nascom, how it obtains communication services, its current systems, its relationship with other NASA centers and International Partner Agencies, some major spaceflight projects which generate significant operational communication support requirements, and major Nascom projects in various stages of development or implementation.

  15. Computing Bounds on Resource Levels for Flexible Plans

    NASA Technical Reports Server (NTRS)

    Muscvettola, Nicola; Rijsman, David

    2009-01-01

    A new algorithm efficiently computes the tightest exact bound on the levels of resources induced by a flexible activity plan (see figure). Tightness of bounds is extremely important for computations involved in planning because tight bounds can save potentially exponential amounts of search (through early backtracking and detection of solutions), relative to looser bounds. The bound computed by the new algorithm, denoted the resource-level envelope, constitutes the measure of maximum and minimum consumption of resources at any time for all fixed-time schedules in the flexible plan. At each time, the envelope guarantees that there are two fixed-time instantiations one that produces the minimum level and one that produces the maximum level. Therefore, the resource-level envelope is the tightest possible resource-level bound for a flexible plan because any tighter bound would exclude the contribution of at least one fixed-time schedule. If the resource- level envelope can be computed efficiently, one could substitute looser bounds that are currently used in the inner cores of constraint-posting scheduling algorithms, with the potential for great improvements in performance. What is needed to reduce the cost of computation is an algorithm, the measure of complexity of which is no greater than a low-degree polynomial in N (where N is the number of activities). The new algorithm satisfies this need. In this algorithm, the computation of resource-level envelopes is based on a novel combination of (1) the theory of shortest paths in the temporal-constraint network for the flexible plan and (2) the theory of maximum flows for a flow network derived from the temporal and resource constraints. The measure of asymptotic complexity of the algorithm is O(N O(maxflow(N)), where O(x) denotes an amount of computing time or a number of arithmetic operations proportional to a number of the order of x and O(maxflow(N)) is the measure of complexity (and thus of cost) of a maximumflow

  16. Water Resources Council Proposed Principles and Standards for Planning Water and Related Land Resources. Notice of Public Review and Hearing.

    ERIC Educational Resources Information Center

    National Archives and Records Services (GSA), Washington, DC. Office of the Federal Register.

    Presented in this notice of a public review and hearing are the proposed Principles and Standards for planning water and related land resources of the United States. Developed by the Water Resources Council pursuant to the Water Resources Planning Act of 1965 (Public Law 89-80), the purpose is to achieve objectives, determined cooperatively,…

  17. Information System Plan.

    ERIC Educational Resources Information Center

    McIntyre, Chuck

    Prepared for review and discussion by the Board of Governors of the California Community Colleges (CCC), this report provides background and recommendations for the refinement, expansion, and increased use of the information system of the CCC Chancellor's Office. Following introductory material proposing an expanded scope of the information system…

  18. A systems engineering management approach to resource management applications

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller

    1989-01-01

    The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

  19. Forest Resource Information System (FRIS)

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The technological and economical feasibility of using multispectral digital image data as acquired from the LANDSAT satellites in an ongoing operational forest information system was evaluated. Computer compatible multispectral scanner data secured from the LANDSAT satellites were demonstrated to be a significant contributor to ongoing information systems by providing the added dimensions of synoptic and repeat coverage of the Earth's surface. Major forest cover types of conifer, deciduous, mixed conifer-deciduous and non-forest, were classified well within the bounds of the statistical accuracy of the ground sample. Further, when overlayed with existing maps, the acreage of cover type retains a high level of positional integrity. Maps were digitized by a graphics design system, overlayed and registered onto LANDSAT imagery such that the map data with associated attributes were displayed on the image. Once classified, the analysis results were converted back to map form as a cover type of information. Existing tabular information as represented by inventory is registered geographically to the map base through a vendor provided data management system. The notion of a geographical reference base (map) providing the framework to which imagery and tabular data bases are registered and where each of the three functions of imagery, maps and inventory can be accessed singly or in combination is the very essence of the forest resource information system design.

  20. Total Cost of Ownership, System Acceptance and Perceived Success of Enterprise Resource Planning Software: Simulating a Dynamic Feedback Perspective of ERP in the Higher Education Environment

    ERIC Educational Resources Information Center

    Fryling, Meg

    2010-01-01

    Enterprise Research Planning (ERP) software is advertised as the product that will "run the enterprise", improving data access and accuracy as well as enhancing business process efficiency. Unfortunately, organizations often make implementation decisions with little consideration for the maintenance phase of an ERP, resulting in significant…

  1. NASA aerospace pyrotechnically actuated systems: Program plan

    NASA Technical Reports Server (NTRS)

    Schulze, Norman R.

    1992-01-01

    The NASA Aerospace Pyrotechnically Actuated Systems (PAS) Program, a focused technology program, is being initiated to enhance the reliability, safety, and performance of pyrotechnically actuated systems. In broad terms, this Program Plan presents the approach that helps to resolve concerns raised by the NASA/DOD/DOE Aerospace Pyrotechnic Steering Committee. This Plan reflects key efforts needed in PAS technology. The resources committed to implement the Program will be identified in the Program Implementation Plan (PIP). A top level schedule is included along with major Program milestones and products. Responsibilities are defined in the PIP. The Plan identifies the goals and detailed objectives which define how those goals are to be accomplished. The Program will improve NASA's capabilities to design, develop, manufacture, and test pyrotechnically actuated systems for NASA's programs. Program benefits include the following: advanced pyrotechnic systems technology developed for NASA programs; hands-on pyrotechnic systems expertise; quick response capability to investigate and resolve pyrotechnic problems; enhanced communications and intercenter support among the technical staff; and government-industry PAS technical interchange. The PAS Program produces useful products that are of a broad-based technology nature rather than activities intended to meet specific technology objectives for individual programs. Serious problems have occurred with pyrotechnic devices although near perfect performance is demanded by users. The lack of a program to address those problems in the past is considered a serious omission. The nature of problems experienced as revealed by a survey are discussed and the origin of the program is explained.

  2. CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan

    SciTech Connect

    NELSON, R.L.

    2000-05-08

    The CH2M Hill Hanford Group, Inc., Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project

  3. Handling uncertainty in quantitative estimates in integrated resource planning

    SciTech Connect

    Tonn, B.E.; Wagner, C.G.

    1995-01-01

    This report addresses uncertainty in Integrated Resource Planning (IRP). IRP is a planning and decisionmaking process employed by utilities, usually at the behest of Public Utility Commissions (PUCs), to develop plans to ensure that utilities have resources necessary to meet consumer demand at reasonable cost. IRP has been used to assist utilities in developing plans that include not only traditional electricity supply options but also demand-side management (DSM) options. Uncertainty is a major issue for IRP. Future values for numerous important variables (e.g., future fuel prices, future electricity demand, stringency of future environmental regulations) cannot ever be known with certainty. Many economically significant decisions are so unique that statistically-based probabilities cannot even be calculated. The entire utility strategic planning process, including IRP, encompasses different types of decisions that are made with different time horizons and at different points in time. Because of fundamental pressures for change in the industry, including competition in generation, gone is the time when utilities could easily predict increases in demand, enjoy long lead times to bring on new capacity, and bank on steady profits. The purpose of this report is to address in detail one aspect of uncertainty in IRP: Dealing with Uncertainty in Quantitative Estimates, such as the future demand for electricity or the cost to produce a mega-watt (MW) of power. A theme which runs throughout the report is that every effort must be made to honestly represent what is known about a variable that can be used to estimate its value, what cannot be known, and what is not known due to operational constraints. Applying this philosophy to the representation of uncertainty in quantitative estimates, it is argued that imprecise probabilities are superior to classical probabilities for IRP.

  4. Large scale Wyoming transportation data: a resource planning tool

    USGS Publications Warehouse

    O'Donnell, Michael S.; Fancher, Tammy S.; Freeman, Aaron T.; Ziegler, Abra E.; Bowen, Zachary H.; Aldridge, Cameron L.

    2014-01-01

    The U.S. Geological Survey Fort Collins Science Center created statewide roads data for the Bureau of Land Management Wyoming State Office using 2009 aerial photography from the National Agriculture Imagery Program. The updated roads data resolves known concerns of omission, commission, and inconsistent representation of map scale, attribution, and ground reference dates which were present in the original source data. To ensure a systematic and repeatable approach of capturing roads on the landscape using on-screen digitizing from true color National Agriculture Imagery Program imagery, we developed a photogrammetry key and quality assurance/quality control protocols. Therefore, the updated statewide roads data will support the Bureau of Land Management’s resource management requirements with a standardized map product representing 2009 ground conditions. The updated Geographic Information System roads data set product, represented at 1:4,000 and +/- 10 meters spatial accuracy, contains 425,275 kilometers within eight attribute classes. The quality control of these products indicated a 97.7 percent accuracy of aspatial information and 98.0 percent accuracy of spatial locations. Approximately 48 percent of the updated roads data was corrected for spatial errors of greater than 1 meter relative to the pre-existing road data. Twenty-six percent of the updated roads involved correcting spatial errors of greater than 5 meters and 17 percent of the updated roads involved correcting spatial errors of greater than 9 meters. The Bureau of Land Management, other land managers, and researchers can use these new statewide roads data set products to support important studies and management decisions regarding land use changes, transportation and planning needs, transportation safety, wildlife applications, and other studies.

  5. Scenario workshops: A useful method for participatory water resources planning?

    NASA Astrophysics Data System (ADS)

    Hatzilacou, Dionyssia; Kallis, Giorgos; Mexa, Alexandra; Coccosis, Harris; Svoronou, Eleni

    2007-06-01

    This article reports on a scenario workshop (SW) for water resources management at the island of Naxos, Greece. The workshop was part of a European research project studying the advantages and limitations of different participatory methods in the context of the Water Framework Directive. It involved policy makers, scientists, business representatives, and citizens from different parts of the island. On the first day, participants worked to envision a sustainable development future for the island and its water resources. Discussion was inspired by four alternative water development scenarios prepared by the organizers. Participants' vision statements emphasized a diversified development path and balanced water solutions. On the second day, participants worked to plan the actions needed to realize their common vision. The SW turned out to be a good method to initiate a multipartner dialogue, to include new stakeholders in the water policy debate, and to a certain extent, to promote learning between participants. On the other hand, it did not appear well suited to resolve conflicts and aid decisions in the face of scientific complexity and uncertainty. SW seems to be a good method for the "upstream," preparatory, capacity-building tasks of a planning process but not for the production of substantive decision outputs such as consensual agreements or action plans. The Naxos experiment also raised the centrality of framing, participant selection, and facilitation in participatory processes.

  6. A Planning and Budget Management System for Day Care.

    ERIC Educational Resources Information Center

    Byers, Bruce B.

    Federal guidelines and pressures for accountability make it essential that more and better planning management information be made available concerning the delivery of day care services. With the existence of a fully developed and operational system, planning and management of resource allocations can be made that can lead to an improved quality…

  7. Maximizing Resource Utilization in Video Streaming Systems

    ERIC Educational Resources Information Center

    Alsmirat, Mohammad Abdullah

    2013-01-01

    Video streaming has recently grown dramatically in popularity over the Internet, Cable TV, and wire-less networks. Because of the resource demanding nature of video streaming applications, maximizing resource utilization in any video streaming system is a key factor to increase the scalability and decrease the cost of the system. Resources to…

  8. 76 FR 50494 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... National Park Service Water Resources Management Plan/Environmental Impact Statement, Mojave National... Scoping Period for Water Resources Management Plan/Environmental Impact Statement for Mojave National... National Park Service is preparing a Water Resources Management Plan/Environmental Impact Statement...

  9. Coupled planning of water resources and agricultural landuse based on an inexact-stochastic programming model

    NASA Astrophysics Data System (ADS)

    Dong, Cong; Huang, Guohe; Tan, Qian; Cai, Yanpeng

    2014-03-01

    Water resources are fundamental for support of regional development. Effective planning can facilitate sustainable management of water resources to balance socioeconomic development and water conservation. In this research, coupled planning of water resources and agricultural land use was undertaken through the development of an inexact-stochastic programming approach. Such an inexact modeling approach was the integration of interval linear programming and chance-constraint programming methods. It was employed to successfully tackle uncertainty in the form of interval numbers and probabilistic distributions existing in water resource systems. Then it was applied to a typical regional water resource system for demonstrating its applicability and validity through generating efficient system solutions. Based on the process of modeling formulation and result analysis, the developed model could be used for helping identify optimal water resource utilization patterns and the corresponding agricultural land-use schemes in three sub-regions. Furthermore, a number of decision alternatives were generated under multiple water-supply conditions, which could help decision makers identify desired management policies.

  10. [Planning human resources in nursing: challenge for the leadership].

    PubMed

    Magalhães, Ana Maria Muller de; Riboldi, Caren de Oliveira; Dall'Agnol, Clarice Maria

    2009-01-01

    This study proposes an essay of issues involving human resources planning in nursing in the hospital sector in our current reality, discussing possible topics for future research. This is a retrospective of the evolution of research on determining the number of staff in Brazil, and the incorporation of new instruments to evaluate the work load based on the degree of dependency of the patients and actions in care. The impact of the quantity and quality of human resources on the results of care is discussed, and the role of leaders in adapting the staff composition, in order to supply safe, risk-free care to the patients and their families, seeking a management model for health practices from the perspective of complex care. PMID:19768341

  11. Impacts of Demand-Side Resources on Electric Transmission Planning

    SciTech Connect

    Hadley, Stanton W.; Sanstad, Alan H.

    2015-01-01

    Will demand resources such as energy efficiency (EE), demand response (DR), and distributed generation (DG) have an impact on electricity transmission requirements? Five drivers for transmission expansion are discussed: interconnection, reliability, economics, replacement, and policy. With that background, we review the results of a set of transmission studies that were conducted between 2010 and 2013 by electricity regulators, industry representatives, and other stakeholders in the three physical interconnections within the United States. These broad-based studies were funded by the US Department of Energy and included scenarios of reduced load growth due to EE, DR, and DG. While the studies were independent and used different modeling tools and interconnect-specific assumptions, all provided valuable results and insights. However, some caveats exist. Demand resources were evaluated in conjunction with other factors, and limitations on transmission additions between scenarios made understanding the role of demand resources difficult. One study, the western study, included analyses over both 10- and 20-year planning horizons; the 10-year analysis did not show near-term reductions in transmission, but the 20-year indicated fewer transmission additions, yielding a 36percent capital cost reduction. In the eastern study the reductions in demand largely led to reductions in local generation capacity and an increased opportunity for low-cost and renewable generation to export to other regions. The Texas study evaluated generation changes due to demand, and is in the process of examining demand resource impacts on transmission.

  12. Program Risk Planning with Risk as a Resource

    NASA Technical Reports Server (NTRS)

    Ray, Paul S.

    1998-01-01

    The current focus of NASA on cost effective ways of achieving mission objectives has created a demand for a change in the risk management process of a program. At present, there is no guidelines as to when risk taking is justified due to high cost for a marginal improvement in risk. As a remedial step, Dr. Greenfield of NASA, developed a concept of risk management with risk as a resource. In the report, the following topics are addressed: (1) the risk management approach; (2) planning risk and program life cycle; (3) key components of a typical program; (4) the risk trading methodology; (5) review and decision process; (6) merits of the proposed risk planning approach; and (7) recommendations.

  13. Planning Istanbul's Public Library System.

    ERIC Educational Resources Information Center

    Dokmeci, Vedia; Korca, Perver

    1992-01-01

    Discussion of the role of public libraries in socioeconomic development focuses on an evaluation of the existing library system in Istanbul (Turkey) and proposes a plan for its balanced development with respect to population distribution and technological advances. Highlights include building design, library automation, and financial…

  14. How to Plan Ventilation Systems.

    ERIC Educational Resources Information Center

    Clarke, John H.

    1963-01-01

    Ventilation systems for factory safety demand careful planning. The increased heat loads and new processes of industry have introduced complex ventilation problems in--(1) ventilation supply, (2) duct work design, (3) space requirements, (4) hood face velocities, (5) discharge stacks, and (6) building eddies. This article describes and diagrams…

  15. State Planning System. Case Studies.

    ERIC Educational Resources Information Center

    Cherin, Ellen, Ed.

    The State Planning System (SPS) is a policy-oriented management tool intended to help analyze the interrelated effects of alternative policies and their relationships to state goals. Two pilot-test case studies are described--the SPS tuition policy evaluation conducted in Colorado, and New York's SPS evaluation of the applicability of large scale…

  16. Assessment of Land and Water Resource Implications of the UK 2050 Carbon Plan

    NASA Astrophysics Data System (ADS)

    Konadu, D. D.; Sobral Mourao, Z.; Skelton, S.; Lupton, R.

    2015-12-01

    The UK Carbon Plan presents four low-carbon energy system pathways that achieves 80% GHG emission targets by 2050, stipulated in the UK Climate Change Act (2008). However, some of the energy technologies prescribed under these pathways are land and water intensive; but would the increase demand for land and water under these pathways lead to increased competition and stress on agricultural land, and water resources in the UK? To answer the above question, this study uses an integrated modelling approach, ForeseerTM, which characterises the interdependencies and evaluates the land and water requirement for the pathways, based on scenarios of power plant location, and the energy crop yield projections. The outcome is compared with sustainable limits of resource appropriation to assess potential stresses and competition for water and land by other sectors of the economy. The results show the Carbon Plan pathways have low overall impacts on UK water resources, but agricultural land use and food production could be significantly impacted. The impact on agricultural land use is shown to be mainly driven by projections for transport decarbonisation via indigenously sourced biofuels. On the other hand, the impact on water resources is mainly associated with increased inland thermal electricity generation capacity, which would compete with other industrial and public water demands. The results highlight the need for a critical appraisal of UK's long term low-carbon energy system planning, in particular bioenergy sourcing strategy, and the siting of thermal power generation in order to avert potential resource stress and competition.

  17. A resource management architecture for metacomputing systems.

    SciTech Connect

    Czajkowski, K.; Foster, I.; Karonis, N.; Kesselman, C.; Martin, S.; Smith, W.; Tuecke, S.

    1999-08-24

    Metacomputing systems are intended to support remote and/or concurrent use of geographically distributed computational resources. Resource management in such systems is complicated by five concerns that do not typically arise in other situations: site autonomy and heterogeneous substrates at the resources, and application requirements for policy extensibility, co-allocation, and online control. We describe a resource management architecture that addresses these concerns. This architecture distributes the resource management problem among distinct local manager, resource broker, and resource co-allocator components and defines an extensible resource specification language to exchange information about requirements. We describe how these techniques have been implemented in the context of the Globus metacomputing toolkit and used to implement a variety of different resource management strategies. We report on our experiences applying our techniques in a large testbed, GUSTO, incorporating 15 sites, 330 computers, and 3600 processors.

  18. NASA's Radioisotope Power Systems - Plans

    NASA Technical Reports Server (NTRS)

    Hamley, John A.; Mccallum, Peter W.; Sandifer, Carl E., II; Sutliff, Thomas J.; Zakrajsek, June F.

    2015-01-01

    NASA's Radioisotope Power Systems (RPS) Program continues to plan and implement content to enable planetary exploration where such systems could be needed, and to prepare more advanced RPS technology for possible infusion into future power systems. The 2014-2015 period saw significant changes, and strong progress. Achievements of near-term objectives have enabled definition of a clear path forward in which payoffs from research investments and other sustaining efforts can be applied. The future implementation path is expected to yield a higher-performing thermoelectric generator design, a more isotope-fuel efficient system concept design, and a robust RPS infrastructure maintained effectively within both NASA and the Department of Energy. This paper describes recent work with an eye towards the future plans that result from these achievements.

  19. A mission planning concept and mission planning system for future manned space missions

    NASA Technical Reports Server (NTRS)

    Wickler, Martin

    1994-01-01

    The international character of future manned space missions will compel the involvement of several international space agencies in mission planning tasks. Additionally, the community of users requires a higher degree of freedom for experiment planning. Both of these problems can be solved by a decentralized mission planning concept using the so-called 'envelope method,' by which resources are allocated to users by distributing resource profiles ('envelopes') which define resource availabilities at specified times. The users are essentially free to plan their activities independently of each other, provided that they stay within their envelopes. The new developments were aimed at refining the existing vague envelope concept into a practical method for decentralized planning. Selected critical functions were exercised by planning an example, founded on experience acquired by the MSCC during the Spacelab missions D-1 and D-2. The main activity regarding future mission planning tasks was to improve the existing MSCC mission planning system, using new techniques. An electronic interface was developed to collect all formalized user inputs more effectively, along with an 'envelope generator' for generation and manipulation of the resource envelopes. The existing scheduler and its data base were successfully replaced by an artificial intelligence scheduler. This scheduler is not only capable of handling resource envelopes, but also uses a new technology based on neuronal networks. Therefore, it is very well suited to solve the future scheduling problems more efficiently. This prototype mission planning system was used to gain new practical experience with decentralized mission planning, using the envelope method. In future steps, software tools will be optimized, and all data management planning activities will be embedded into the scheduler.

  20. Mineral Resources Data System (MRDS)

    USGS Publications Warehouse

    Mason, G.T.; Arndt, R.E.

    1996-01-01

    The U.S. Geological Survey (USGS) operates the Mineral Resources Data System (MRDS), a digital system that contained 111,955 records on Sept. 1, 1995. Records describe metallic and industrial commodity deposits, mines, prospects, and occurrences in the United States and selected other countries. These records have been created over the years by USGS commodity specialists and through cooperative agreements with geological surveys of U.S. States and other countries. This CD-ROM contains the complete MRDS data base, several subsets of it, and software to allow data retrieval and display. Data retrievals are made by using GSSEARCH, a program that is included on this CD-ROM. Retrievals are made by specifying fields or any combination of the fields that provide information on deposit name, location, commodity, deposit model type, geology, mineral production, reserves, and references. A tutorial is included. Retrieved records may be printed or written to a hard disk file in four different formats: ascii, fixed, comma delimited, and DBASE compatible.

  1. 78 FR 16656 - Draft Damage Assessment and Restoration Plan and Environmental Assessment for Natural Resource...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ... National Oceanic and Atmospheric Administration Draft Damage Assessment and Restoration Plan and... Restoration Plan and Environmental Assessment for natural resource injuries and service losses associated with..., notice is hereby given that a document entitled, ``Damage Assessment and Restoration Plan...

  2. A Generalized Decision Framework Using Multi-objective Optimization for Water Resources Planning

    NASA Astrophysics Data System (ADS)

    Basdekas, L.; Stewart, N.; Triana, E.

    2013-12-01

    Colorado Springs Utilities (CSU) is currently engaged in an Integrated Water Resource Plan (IWRP) to address the complex planning scenarios, across multiple time scales, currently faced by CSU. The modeling framework developed for the IWRP uses a flexible data-centered Decision Support System (DSS) with a MODSIM-based modeling system to represent the operation of the current CSU raw water system coupled with a state-of-the-art multi-objective optimization algorithm. Three basic components are required for the framework, which can be implemented for planning horizons ranging from seasonal to interdecadal. First, a water resources system model is required that is capable of reasonable system simulation to resolve performance metrics at the appropriate temporal and spatial scales of interest. The system model should be an existing simulation model, or one developed during the planning process with stakeholders, so that 'buy-in' has already been achieved. Second, a hydrologic scenario tool(s) capable of generating a range of plausible inflows for the planning period of interest is required. This may include paleo informed or climate change informed sequences. Third, a multi-objective optimization model that can be wrapped around the system simulation model is required. The new generation of multi-objective optimization models do not require parameterization which greatly reduces problem complexity. Bridging the gap between research and practice will be evident as we use a case study from CSU's planning process to demonstrate this framework with specific competing water management objectives. Careful formulation of objective functions, choice of decision variables, and system constraints will be discussed. Rather than treating results as theoretically Pareto optimal in a planning process, we use the powerful multi-objective optimization models as tools to more efficiently and effectively move out of the inferior decision space. The use of this framework will help CSU

  3. System integration test plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-24

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  4. 77 FR 46518 - Draft Resource Management Plan/General Plan Draft Environmental Impact Statement/Revised Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... Bureau of Reclamation Draft Resource Management Plan/General Plan Draft Environmental Impact Statement... Plan/ General Plan (RMP/GP) Draft Environmental Impact Statement/Revised Draft Environmental Impact... recreation lands ] within the vicinity of Los Banos, California. The general project location is south...

  5. A good integrated resource plan: Guidelines for electric utilities and regulators

    SciTech Connect

    Hirst, E.

    1992-12-01

    Integrated resource planning helps utilities and state regulatory commissions consistently assess a broad range of demand and supply resources to meet customer energy-service needs cost-effectively. Key characteristics of this planning approach include: explicit consideration and fair treatment of a wide variety of demand and supply options, consideration of the environmental and other social costs of providing energy services, public participation in the development of the resource plan, and analysis of the uncertainties associated with different external factors and resource options. Integrated resource planning differs from traditional planning in the types and scope of resources considered, the owners of the resources, the organizations involved in resource planning, and the criteria for resource selection. This report presents suggestions to utilities on how to conduct such planning and what to include in their resource-planning reports. These suggestions are based on a review of about 50 resource plans as well as discussions with and presentations to regulators and utilities. The suggestions cover four broad topics; the technical competence with which the plan was developed; the adequacy, detail, and consistency (with the long-term plan) of the short-term action plan; the extent to which the interests of various stakeholders was considered, both in public participation in plan development and in the variety of resource plans developedand assessed; and the clarity and comprehensiveness of the utility`s report on its plan. Technical competence includes energy and demand forecasts, assessment of supply and demand resources, resource integration, and treatment of uncertainty. Issues associated with forecasts include forecasting approaches; links between the forecasts of energy use and peak demands; and links between the forecasts and the effects of past, present, and future demand-side management programs.

  6. A good integrated resource plan: Guidelines for electric utilities and regulators

    SciTech Connect

    Hirst, E.

    1992-12-01

    Integrated resource planning helps utilities and state regulatory commissions consistently assess a broad range of demand and supply resources to meet customer energy-service needs cost-effectively. Key characteristics of this planning approach include: explicit consideration and fair treatment of a wide variety of demand and supply options, consideration of the environmental and other social costs of providing energy services, public participation in the development of the resource plan, and analysis of the uncertainties associated with different external factors and resource options. Integrated resource planning differs from traditional planning in the types and scope of resources considered, the owners of the resources, the organizations involved in resource planning, and the criteria for resource selection. This report presents suggestions to utilities on how to conduct such planning and what to include in their resource-planning reports. These suggestions are based on a review of about 50 resource plans as well as discussions with and presentations to regulators and utilities. The suggestions cover four broad topics; the technical competence with which the plan was developed; the adequacy, detail, and consistency (with the long-term plan) of the short-term action plan; the extent to which the interests of various stakeholders was considered, both in public participation in plan development and in the variety of resource plans developedand assessed; and the clarity and comprehensiveness of the utility's report on its plan. Technical competence includes energy and demand forecasts, assessment of supply and demand resources, resource integration, and treatment of uncertainty. Issues associated with forecasts include forecasting approaches; links between the forecasts of energy use and peak demands; and links between the forecasts and the effects of past, present, and future demand-side management programs.

  7. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    NASA Technical Reports Server (NTRS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny

    2008-01-01

    The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

  8. Evaluating collaborative planning methods supporting programme-based planning in natural resource management.

    PubMed

    Vacik, Harald; Kurttila, Mikko; Hujala, Teppo; Khadka, Chiranjeewee; Haara, Arto; Pykäläinen, Jouni; Honkakoski, Päivi; Wolfslehner, Bernhard; Tikkanen, Jukka

    2014-11-01

    Programme-based Planning of Natural Resources (PBPNR) is an evolving planning frame for solving complex land use, environmental and forest management problems within hierarchically administrated funding and decision-making schemes. PBPNR acknowledges that an effective planning process requires the combined consideration of environmental, technological, economic and socio-political factors. To reach acceptability, commitment and operability, PBPNR processes need to foster collaboration and learning. For this study, an analysis of 43 collaborative planning methods was conducted to examine their potential to be applied within PBPNR. We present the approach of screening the applicability of methods for specific needs that may occur in PBPNR. The approach is based on a list of key criteria for the phases of a collaborative planning process: problem identification, problem modelling and problem solving. The features of each method were qualitatively assessed and peer-reviewed by a team of experts. Most of the methods are able to deal with qualitative data, support processes to increase transparency in planning and capture the preferences of the participating stakeholders. They also produce understandable results for the three phases. Contrarily, many methods do not offer features to handle uncertainty, nor do they satisfactorily stimulate creativity and innovation in the planning process. The results show that the overall applicability of the reviewed methods for the three planning phases varies according to a cluster analysis basing on the capabilities of the methods. Methods such as "Planning for Real", "Open Space" and "A'WOT" seem to be particularly promising for a broad range of planning situations. PMID:24981159

  9. Systems Analysis and Its Relationship to Educational Planning.

    ERIC Educational Resources Information Center

    Knezevich, S.J.

    From the systems viewpoint, educational planning is the mechanism through which the educational system makes its goals specific and adapt its priorities, resources, and operational patterns to the changing environmental forces of its particular society. The systems-oriented administrator is a change agent and innovative strategist who delegates…

  10. Community resiliency through recovery resource supply chain planning.

    PubMed

    Franklin, Charlotte; Todt, Kiersten

    2014-01-01

    Information in this paper is the result of recommendations and remedies developed at 'Local Supply Chain Capacity in a Crisis Summit Exercise' held in Arlington, VA on 30th-31st January,2013. At the event, which was funded through the Regional Catastrophic Preparedness Grant Program, national private sector and not-for-profit essential resource provider experts in sectors such as transportation, communication systems, energy/power, financial resources, medical supplies and other vital supplies, together with emergency managers, discussed best practices, major challenges and exchanged remedy recommendations. PMID:24578021

  11. Resource management plan for the Oak Ridge Reservation

    SciTech Connect

    Parr, P.D. ); Evans, J.W. )

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy's Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory's Environmental Sciences Division.

  12. Demil planning and management system

    SciTech Connect

    Huber, C.C.; Bormet, S.M.; Whitfield, R.G.; Bowen, M.; Chun, K.C.; Golden, R.E.; Fuller, R.

    1997-08-01

    The National Maintenance Point (NMP) Branch of the US Army Industrial Operations Command (IOC) serves as the Single Manager for Conventional Ammunition (SMCA) agent for managing the renovation, modification, recycling, and disposal of conventional ammunition, thereby improving readiness. The mission of the NMP includes program management for demilitarization (demil) activities, ammunition maintenance, and ammunition peculiar equipment (APE) projects. Through an Interagency Agreement between the US Army and the US Department of Energy, Argonne National Laboratory (ANL) is developing an integrated data management system, called the Demil Planning and Management System (DPMS), for IOC. DPMS is intended to help NMP efficiently manage information on ongoing demil project activities and asset inventories, plan future projects, and allocate budgets. This system, when fully implemented, will also make it possible for the user community to interactively access the DPMS database; perform data entry and queries; and run reports through network, modem, and Internet access to the system. This paper describes the principal components of the DPMS, current capabilities, and planned enhancements.

  13. Strengthening laboratory systems in resource-limited settings.

    PubMed

    Olmsted, Stuart S; Moore, Melinda; Meili, Robin C; Duber, Herbert C; Wasserman, Jeffrey; Sama, Preethi; Mundell, Ben; Hilborne, Lee H

    2010-09-01

    Considerable resources have been invested in recent years to improve laboratory systems in resource-limited settings. We reviewed published reports, interviewed major donor organizations, and conducted case studies of laboratory systems in 3 countries to assess how countries and donors have worked together to improve laboratory services. While infrastructure and the provision of services have seen improvement, important opportunities remain for further advancement. Implementation of national laboratory plans is inconsistent, human resources are limited, and quality laboratory services rarely extend to lower tier laboratories (eg, health clinics, district hospitals). Coordination within, between, and among governments and donor organizations is also frequently problematic. Laboratory standardization and quality control are improving but remain challenging, making accreditation a difficult goal. Host country governments and their external funding partners should coordinate their efforts effectively around a host country's own national laboratory plan to advance sustainable capacity development throughout a country's laboratory system. PMID:20716792

  14. A Values Based Objectives Planning System: Planning for Quality Education.

    ERIC Educational Resources Information Center

    Burns, Mildred L.

    The Values Based Objectives Planning System is a method of educational planning that will achieve quality education, according to the author, by expressing goals and objectives as values instead of as behaviors. The author first defines planning as the preparation in visual form of a conceptual model of a thing, operation, or event. She then…

  15. Water resources planning for rivers draining into Mobile Bay

    NASA Technical Reports Server (NTRS)

    April, G. C.

    1976-01-01

    The application of remote sensing, automatic data processing, modeling and other aerospace related technologies to hydrological engineering and water resource management are discussed for the entire river drainage system which feeds the Mobile Bay estuary. The adaptation and implementation of existing mathematical modeling methods are investigated for the purpose of describing the behavior of Mobile Bay. Of particular importance are the interactions that system variables such as river flow rate, wind direction and speed, and tidal state have on the water movement and quality within the bay system.

  16. Clinical and human resource planning for the downsizing of psychiatric hospitals: the British Columbia experience.

    PubMed

    Macfarlane, D; Fortin, P; Fox, J; Gundry, S; Oshry, J; Warren, E

    1997-01-01

    Riverview Hospital, B.C.'s only and Canada's largest remaining provincial psychiatric hospital began a formal planned "downsizing" process in 1992. This initiative was an important element in the Province's strategic plan to shift to a more community-focused mental health system and to bring tertiary psychiatric services "closer to home" by redeveloping Riverview Hospital on three sites. The paper summarizes the literature pertaining to the "downsizing" of psychiatric hospital services in relation both to clinical and human resource planning. It describes the mental health system in B.C. and the service system context in which this exercise is occurring. It is based on the first three years of experience in identifying the major challenges and the strategies developed to meet these challenges. It draws some conclusions about the effectiveness of these strategies and it speculates about the likely future challenges as the "downsizing" process continues. PMID:9021839

  17. 78 FR 16706 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ... Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal...

  18. 75 FR 8106 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal...

  19. 78 FR 67393 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal...

  20. 76 FR 73674 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal...

  1. Electronic Resource Management Systems in Practice

    ERIC Educational Resources Information Center

    Grogg, Jill E.

    2008-01-01

    Electronic resource management (ERM) systems have inundated the library marketplace. Both integrated library systems (ILS) vendors and subscription agents are now offering products and service enhancements that claim to help libraries efficiently manage their electronic resources. Additionally, some homegrown and open-source solutions have emerged…

  2. 25 CFR 166.311 - Is an Indian agricultural resource management plan required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan... WATER GRAZING PERMITS Land and Operations Management Management Plans and Environmental Compliance § 166.311 Is an Indian agricultural resource management plan required? (a) Indian agricultural land...

  3. 10 CFR 719.15 - What are the requirements for a staffing and resource plan?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false What are the requirements for a staffing and resource plan? 719.15 Section 719.15 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.15 What are the requirements for a staffing and resource plan? (a) For significant matters, the contractor must require...

  4. Strategic planning for power system restorations

    SciTech Connect

    Bent, Russell W; Van Hententyck, Pascal; Coffrin, Carleton

    2010-10-12

    This paper considers the power system restoration planning problem (PSRPP) for disaster recovery, a fundamental problem faced by all populated areas. PSRPPs are complex stochastic optimization problems that combine resource allocation, warehouse location, and vehicle routing considerations. Furthermore, electrical power systems are complex systems whose behavior can only be determined by physics simulations. Moreover, these problems must be solved under tight runtime constraints to be practical in real-world disaster situations. This work is three fold: (1) it formalizes the specification of PSRPPs; (2) introduces a simple optimization-simulation hybridization necessary for solving PSRPPs; and (3) presents a complete restoration algorithm that utilizes the strengths of mixed integer programming, constraint programming, and large neighborhood search. This paper studied a novel problem in the field of humanitarian logistics, the Power System Restoration Problem (PSRPP). The PSRPP models the strategic planning process for post disaster power system recovery. The paper proposed a multi-stage stochastic hybrid optimization algorithm that yields high quality solutions to real-world benchmarks provided by Los Alamos National Laboratory (LANL). The algorithm uses a variety of technologies, including MIP, constraint programming, and large neighborhood search, to exploit the structure of each individual optimization subproblem. The experimental results on hurricane disaster benchmarks indicate that the algorithm is practical from a computational standpoint and produce significant improvements over existing relief delivery procedures.

  5. PlanWorks: A Debugging Environment for Constraint Based Planning Systems

    NASA Technical Reports Server (NTRS)

    Daley, Patrick; Frank, Jeremy; Iatauro, Michael; McGann, Conor; Taylor, Will

    2005-01-01

    Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.

  6. Integration Framework of Process Planning based on Resource Independent Operation Summary to Support Collaborative Manufacturing

    SciTech Connect

    Kulvatunyou, Boonserm; Wysk, Richard A.; Cho, Hyunbo; Jones, Albert

    2004-06-01

    In today's global manufacturing environment, manufacturing functions are distributed as never before. Design, engineering, fabrication, and assembly of new products are done routinely in many different enterprises scattered around the world. Successful business transactions require the sharing of design and engineering data on an unprecedented scale. This paper describes a framework that facilitates the collaboration of engineering tasks, particularly process planning and analysis, to support such globalized manufacturing activities. The information models of data and the software components that integrate those information models are described. The integration framework uses an Integrated Product and Process Data (IPPD) representation called a Resource Independent Operation Summary (RIOS) to facilitate the communication of business and manufacturing requirements. Hierarchical process modeling, process planning decomposition and an augmented AND/OR directed graph are used in this representation. The Resource Specific Process Planning (RSPP) module assigns required equipment and tools, selects process parameters, and determines manufacturing costs based on two-level hierarchical RIOS data. The shop floor knowledge (resource and process knowledge) and a hybrid approach (heuristic and linear programming) to linearize the AND/OR graph provide the basis for the planning. Finally, a prototype system is developed and demonstrated with an exemplary part. Java and XML (Extensible Markup Language) are used to ensure software and information portability.

  7. 78 FR 35957 - Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... Framework Plan. Additionally, the RMP will cover lands in the Fairbanks North Star Borough that are... and traditional lifestyles; and impacts from climate change. Preliminary planning criteria include: 1... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan for the Central...

  8. Remote Excavation System test plan

    SciTech Connect

    Walker, S.; Hyde, R.A.

    1993-05-01

    The Office of Technology Development (OTD) established the Robotics Technology Development Program (RTDP) to integrate robotic development activities on a national basis; provide needs-oriented, timely, and economical robotics technology to support environmental and waste operations activities at Department of Energy (DOE) sites; and provide the focus and direction for the near term (less than five years) and guidance for the tong-term (five to twenty years) research and development efforts for site-specific problems. The RTDP consists of several programs including the Buried Waste Robotics Program (BWRP), which addresses remote buried waste applications. The Remote Excavation System (RES) was developed under the RTDP to provide a safer method of excavating hazardous materials for both the DOE and the Department of Defense (DOD). The excavator, initially developed by the DOD as a manually-operated small excavator, has been modified for teleoperation with joint funding from the BWRP and the DOD. The Buried Waste Integrated Demonstration (BWID) and the Uranium Soils Integrated Demonstration (USID) are funding the demonstration, testing, and evaluation of the RES covered in this test plan. This document covers testing both at Oak Ridge National Laboratory (ORNL) and the Idaho National Engineering Laboratory (INEL), as funded by BWID and USID. This document describes the tests planned for the RES demonstration for the BWRP. The purposes of the test plan are (1) to establish test parameters to ensure that the demonstration results are deemed useful and usable and (2) to demonstrate performance in a safe manner within all regulatory requirements.

  9. Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

    NASA Technical Reports Server (NTRS)

    Jacobs, Derya, A.; Aasen, Curtis A.

    2000-01-01

    Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the

  10. The application of the water resources modeling platform from strategic planning through to operational control

    NASA Astrophysics Data System (ADS)

    Mallory, S. J. L.; van Vuuren, S. J.; Pashkin, E. A.

    The concepts of a water resources modeling approach which caters for the varying levels of modeling detail required for broad strategic planning through to the short-term operation of reservoirs have been described by Mallory and van Vuuren [Mallory, S.J.L., van Vuuren, S.J., 2007. Integration of water resources modelling approaches for varying levels of decision-making. In: Fourth International Conference on Water Resources Management. WITPress, Wessex, UK]. This paper addresses the application of this approach in practice on South Africa’s Algoa system, a complex and strategically important catchment within South Africa. The Algoa system was modeled, firstly in reconnaissance mode to gain a broad understanding of the water requirements and the available water resource, then in systems analysis mode to take into account the actual operating rules applied in the catchment, and thirdly in short-term operation mode, to determine when restrictions should be imposed in order to avoid catastrophic failure of the system. The conclusion reached in this paper that this multi-tiered modeling approach is a useful tool for enhancing the understanding of decision makers and stakeholders of how the water resources in a catchment are managed and offers a considerable improvement in terms of the time and effort expended on setting up, running and maintaining several models each supporting it own niche in the decision-making framework.

  11. Classification systems for natural resource management

    USGS Publications Warehouse

    Kleckner, Richard L.

    1981-01-01

    Resource managers employ various types of resource classification systems in their management activities such as inventory, mapping, and data analysis. Classification is the ordering or arranging of objects into groups or sets on the basis of their relationships, and as such, provide the resource managers with a structure for organizing their needed information. In addition of conforming to certain logical principles, resource classifications should be flexible, widely applicable to a variety of environmental conditions, and useable with minimal training. The process of classification may be approached from the bottom up (aggregation) or the top down (subdivision) or a combination of both, depending on the purpose of the classification. Most resource classification systems in use today focus on a single resource and are used for a single, limited purpose. However, resource managers now must employ the concept of multiple use in their management activities. What they need is an integrated, ecologically based approach to resource classification which would fulfill multiple-use mandates. In an effort to achieve resource-data compatibility and data sharing among Federal agencies, and interagency agreement has been signed by five Federal agencies to coordinate and cooperate in the area of resource classification and inventory.

  12. Goal Selection for Embedded Systems with Oversubscribed Resources

    NASA Technical Reports Server (NTRS)

    Rabideau, Gregg; Chien, Steve; McLaren, David

    2010-01-01

    We describe an efficient, online goal selection algorithm and its use for selecting goals at runtime. Our focus is on the re-planning that must be performed in a timely manner on the embedded system where computational resources are limited. In particular, our algorithm generates near optimal solutions to problems with fully specified goal requests that oversubscribe available resources but have no temporal flexibility. By using a fast, incremental algorithm, goal selection can be postponed in a "just-in-time" fashion allowing requests to be changed or added at the last minute. This enables shorter response cycles and greater autonomy for the system under control.

  13. Special Education Resource System Guidelines. Revised.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    A Special Education Resource System (SERS) is a local school district's clearinghouse for all instructional materials used to teach handicapped students in any given instructional arrangement. It gives teachers ready access to instructional resources that correlate with the district's curriculum objectives and the student's individual educational…

  14. Human Resource Administration in Catholic School Systems.

    ERIC Educational Resources Information Center

    Dobzanski, Joan L.

    2000-01-01

    Describes a comprehensive human resource program, the purpose of which is to enhance the quality of Catholic education for all students. Defines the assumptions on which the formation and implementation of human resource programs for Catholic schools are based. Highlights the role and responsibilities of Catholic school system leaders. (VWC)

  15. Statewide Strategic Forest Resource Planning Programs: Evaluation Based on Context, Process, Outputs, and Performance.

    ERIC Educational Resources Information Center

    Gray, Gerald J.; Ellefson, Paul V.

    1991-01-01

    Evaluation of strategic planning programs is illustrated using the examples of statewide forest resource planning programs implemented by state governments in 1986. Client-based perspectives were studied via a survey of 216 officials affected by the forestry planning program. Considering planning's context, process, outputs, and performance helped…

  16. High-performance cyberinfrastructure for water resource planning and management

    NASA Astrophysics Data System (ADS)

    Jones, N.; Ogden, F. L.; Nelson, J.

    2012-12-01

    Water resource managers face increasingly difficult challenges as population growth leads to unprecedented demands on our finite supply of fresh water. Resolving water disputes and planning for growth demand increasingly sophisticated simulation tools involving complex spatial data and high-performance models and hardware. In additional to technological complexity, the range of input from social, environmental, and political decision makers required to make appropriate decisions has widened. Unfortunately, running such models is often beyond the capability of water managers and other stakeholders and/or is cost prohibitive to be used on a routine basis. In this presentation, we present a new NSF EPSCoR-funded project featuring four universities from Utah and Wyoming. One of the objectives of this project is the development of cyberinfrastructure for community-based modeling tools hosted on the Cloud and accessed via web-based interfaces. A primary hurdle in developing such tools is that each model is unique and involves a different set of inputs, outputs, and criteria for analysis. Therefore, coding a custom web-application from scratch for each Cloud-based modeling application is not feasible. To address this issue, we are developing a library of low-level GIS-based geoprocessing tools which can be configured via a simple scripting language to build custom workflows involving complex spatial data and high-resolution numerical models. We are also developing a suite of tools for hosting such workflows via a simple, yet powerful web-interface. This library will provide a template for delivering powerful modeling tools and access to spatial information to the hands of the managers and decision makers involved in water resources. We demonstrate this strategy using a web-based simulation environment built for the State of Utah Department of Water Rights. This tool is used to simulate the impact of proposed wells on existing water rights, including water table drawdown

  17. A corrosivity classification system for geothermal resources

    SciTech Connect

    Conover, Marshall F.

    1982-10-08

    The most important difference between traditional steam systems and those that utilize geothermal fluids is the potential for corrosion of metals. The recently developed sourcebook ''Materials Selection Guidelines for Geothermal Energy Utilization Systems'' is expected to facilitate corrosion engineering decision making and reduce the cost of geothermal systems where new resources are similar to those presented by the corrosivity classification system.

  18. Grid-based modeling for land use planning and environmental resource mapping.

    SciTech Connect

    Kuiper, J. A.

    1999-08-04

    Geographic Information System (GIS) technology is used by land managers and natural resource planners for examining resource distribution and conducting project planning, often by visually interpreting spatial data representing environmental or regulatory variables. Frequently, many variables influence the decision-making process, and modeling can improve results with even a small investment of time and effort. Presented are several grid-based GIS modeling projects, including: (1) land use optimization under environmental and regulatory constraints; (2) identification of suitable wetland mitigation sites; and (3) predictive mapping of prehistoric cultural resource sites. As different as the applications are, each follows a similar process of problem conceptualization, implementation of a practical grid-based GIS model, and evaluation of results.

  19. Resource Prospector Propulsion System Cold Flow Testing

    NASA Technical Reports Server (NTRS)

    Williams, Hunter; Holt, Kim; Addona, Brad; Trinh, Huu

    2015-01-01

    Resource Prospector (RP) is a NASA mission being led by NASA Ames Research Center with current plans to deliver a scientific payload package aboard a rover to the lunar surface. As part of an early risk reduction activity, Marshall Space Flight Center (MSFC) and Johnson Space Flight Center (JSC) have jointly developed a government-version concept of a lunar lander for the mission. The spacecraft consists of two parts, the lander and the rover which carries the scientific instruments. The lander holds the rover during launch, cruise, and landing on the surface. Following terminal descent and landing the lander portion of the spacecraft become dormant after the rover embarks on the science mission. The lander will be equipped with a propulsion system for lunar descent and landing, as well as trajectory correction and attitude control maneuvers during transit to the moon. Hypergolic propellants monomethyl hydrazine and nitrogen tetroxide will be used to fuel sixteen 70-lbf descent thrusters and twelve 5-lbf attitude control thrusters. A total of four metal-diaphragm tanks, two per propellant, will be used along with a high-pressure composite-overwrapped pressure vessel for the helium pressurant gas. Many of the major propulsion system components are heritage missile hardware obtained by NASA from the Air Force. In parallel with the flight system design activities, a simulated propulsion system based on flight drawings was built for conducting a series of water flow tests to characterize the transient fluid flow of the propulsion system feed lines and to verify the critical operation modes such as system priming, waterhammer, and crucial mission duty cycles. The primary objective of the cold flow testing was to simulate the RP propulsion system fluid flow operation through water flow testing and to obtain data for anchoring analytical models. The models will be used to predict the transient and steady state flow behaviors in the actual flight operations. All design and

  20. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Annual review of system safety program plan and... SAFETY OVERSIGHT Role of the State Oversight Agency § 659.25 Annual review of system safety program plan... annual review of its system safety program plan and system security plan. (b) In the event the...

  1. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Annual review of system safety program plan and... SAFETY OVERSIGHT Role of the State Oversight Agency § 659.25 Annual review of system safety program plan... annual review of its system safety program plan and system security plan. (b) In the event the...

  2. Business System Planning Project System Requirements Specification

    SciTech Connect

    NELSON, R.E.

    2000-09-08

    The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

  3. The role of competitive forces in integrated resource planning

    SciTech Connect

    Kahn, E.; Goldman, C.

    1991-10-01

    In this report, we study the potential for competitive forces to enhance the efficiency of integrated resource planning and produce consumer cost reductions. We examine the efficiency gains from competition in the private power market, and ask whether similar forces can be successful on the demand-side of the market. The goal of this analysis is to identify and elucidate options available to state Public Utility Commissions (PUCs) to support competition in utility demand-side management programs to achieve efficiencies similar to those being achieved through development of competitive forces on the supply-side of the industry. We consider the entire market structure from upstream suppliers to distribution intermediaries to ultimate consumers. The market structure differs substantially between the demand-side and the supply-side of the electricity market. Demand-site electricity markets have a longer distribution chain and more intermediaries than the supply-side, which is attributable in part to the ultimately retail nature of demand and the wholesale nature of supply, and in part indicates market failures.

  4. A case study of exploiting enterprise resource planning requirements

    NASA Astrophysics Data System (ADS)

    Niu, Nan; Jin, Mingzhou; Cheng, Jing-Ru C.

    2011-05-01

    The requirements engineering (RE) processes have become a key to conceptualising corporate-wide integrated solutions based on packaged enterprise resource planning (ERP) software. The RE literature has mainly focused on procuring the most suitable ERP package. Little is known about how an organisation exploits the chosen ERP RE model to frame the business application development. This article reports an exploratory case study of a key tenet of ERP RE adoption, namely that aligning business applications to the packaged RE model leads to integral practices and economic development. The case study analysed a series interrelated pilot projects developed for a business division of a large IT manufacturing and service company, using Oracle's appl1ication implementation method (AIM). The study indicated that AIM RE improved team collaboration and project management experience, but needed to make hidden assumptions explicit to support data visibility and integrity. Our study can direct researchers towards rigorous empirical evaluations of ERP RE adoption, collect experiences and lessons learned for practitioners, and help generate more effective and mature processes when exploiting ERP RE methods.

  5. 76 FR 62819 - Notice of Intent To Amend the Resource Management Plan for the San Luis Resource Area, Colorado...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... Bureau of Land Management Notice of Intent To Amend the Resource Management Plan for the San Luis Resource Area, Colorado, and Associated Environmental Assessment AGENCY: Bureau of Land Management..., the Bureau of Land Management (BLM) San Luis Valley Public Lands Center, Monte Vista,...

  6. American Indian Systems for Natural Resource Management.

    ERIC Educational Resources Information Center

    Quintana, Jorge O.

    1992-01-01

    Outlines the philosophy and general principles of "primitive" indigenous production technologies and natural resource management systems in North and South America. Discusses indigenous practices that promote sustainable production in gathering, hunting and fishing, minerals extraction, and agriculture. (SV)

  7. California environmental resources evaluation system in the NBS partnership

    SciTech Connect

    Greenwood, G.B.

    1995-12-31

    The California Resources Agency launched the California Environmental Resources Evaluation System (CERES) in July, 1994 to provide information on the state`s ecological systems and conservation activities to citizens throughout California Operating off the Internet and using Mosaic software, CERES allows the public to search and locate information at different sites, including public to search and locate information at different sites, including public agencies, universities and local watershed groups. The project will coordinate the compilation of seamless datasets available on a distributed network of servers from state, federal and local sources to support resource management and conservation planning. The designation of CERES as a major initiative by the Resources Agency, in collaboration with the National Biological Survey and other state and federal agencies, reflects a new approach to biological conservation that recognizes multiple sources of authority for conservation that recognizes multiple sources of authority for conservation planning - from the local to the federal - as well as the central role of place in organizing citizens` perceptions of ecological systems. By facilitating the access of all stakeholders to information on the state`s ecological systems and conservation activities, CERES will promote a more profound public discussion and a more appropriate articulation of the relationship between social and ecological systems in the state.

  8. Adapting water accounting for integrated water resource management. The Júcar Water Resource System (Spain)

    NASA Astrophysics Data System (ADS)

    Momblanch, Andrea; Andreu, Joaquín; Paredes-Arquiola, Javier; Solera, Abel; Pedro-Monzonís, María

    2014-11-01

    An increase in water demands, exacerbated by climate change and the tightening of environmental requirements, leads to a reduction in available water resources for economic uses. This situation poses challenges for water resource planning and management. Water accounting has emerged as an appropriate tool to improve transparency and control in water management. There are multiple water accounting approaches, but they generally involve a very exhaustive list of accounted concepts. According to our findings in this research, one of the best water accounting methodologies is the Australian Water Accounting Standard. However, its implementation for integrated water resource planning and management purposes calls into questioning the amount of information and level of detail necessary for the users of water accounts. In this paper, we present a different method of applying the Australian Water Accounting Standard in relation to water resource management, which improves its utility. In order to compare the original approach and that proposed here, we present and discuss an application to the Júcar Water Resource System, in eastern Spain.

  9. The Best Laid Plans: Community-Based Natural Resource Management (CBNRM) Group Capacity and Planning Success

    NASA Astrophysics Data System (ADS)

    Mountjoy, Natalie J.; Seekamp, Erin; Davenport, Mae A.; Whiles, Matt R.

    2013-12-01

    As community-based natural resource management (CBNRM) increases in popularity, the question of the capacity of such groups to successfully manage natural resources becomes increasingly relevant. However, few studies have quantifiably analyzed how the amount or type of capacity in a CBNRM organization directly affects the outputs or the environmental outcomes produced. This paucity of research exists in part due to the diversity of indicators for CBNRM group capacity, as well as the ensuing debate over how to best define and measure success in CBNRM initiatives. Although concrete outputs vary widely, many efforts center on creating natural resource management plans (RMPs). The primary objective of our research was to explore the link between capacity and RMP implementation success, as perceived by practitioners among CBNRM groups across Illinois. A short online survey was constructed, utilizing findings from focus groups in combination with an extensive literature review, to measure CBNRM participants' ( n = 190) perceptions of 10 key capacity indicators and RMP implementation success. Results show that capacity perceptions varied significantly among respondents in low, moderate, and high RMP implementation success groups, and that group capacity was predictive of the degree of perceived RMP implementation success. Further, our findings suggest that bonding social capital and outreach are crucial in predicting low versus moderate RMP success, while leadership, motivation, and vision best distinguish the moderately successful and highly successful groups.

  10. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    SciTech Connect

    Parr, P.D.; Evans, J.W.

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  11. The best laid plans: community-based natural resource management (CBNRM) group capacity and planning success.

    PubMed

    Mountjoy, Natalie J; Seekamp, Erin; Davenport, Mae A; Whiles, Matt R

    2013-12-01

    As community-based natural resource management (CBNRM) increases in popularity, the question of the capacity of such groups to successfully manage natural resources becomes increasingly relevant. However, few studies have quantifiably analyzed how the amount or type of capacity in a CBNRM organization directly affects the outputs or the environmental outcomes produced. This paucity of research exists in part due to the diversity of indicators for CBNRM group capacity, as well as the ensuing debate over how to best define and measure success in CBNRM initiatives. Although concrete outputs vary widely, many efforts center on creating natural resource management plans (RMPs). The primary objective of our research was to explore the link between capacity and RMP implementation success, as perceived by practitioners among CBNRM groups across Illinois. A short online survey was constructed, utilizing findings from focus groups in combination with an extensive literature review, to measure CBNRM participants' (n = 190) perceptions of 10 key capacity indicators and RMP implementation success. Results show that capacity perceptions varied significantly among respondents in low, moderate, and high RMP implementation success groups, and that group capacity was predictive of the degree of perceived RMP implementation success. Further, our findings suggest that bonding social capital and outreach are crucial in predicting low versus moderate RMP success, while leadership, motivation, and vision best distinguish the moderately successful and highly successful groups. PMID:24104728

  12. NASCOM system development plan: System description, capabilities, and plans, FY 94-2

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.

  13. Automatic Scheduling and Planning (ASAP) in future ground control systems

    NASA Technical Reports Server (NTRS)

    Matlin, Sam

    1988-01-01

    This report describes two complementary approaches to the problem of space mission planning and scheduling. The first is an Expert System or Knowledge-Based System for automatically resolving most of the activity conflicts in a candidate plan. The second is an Interactive Graphics Decision Aid to assist the operator in manually resolving the residual conflicts which are beyond the scope of the Expert System. The two system designs are consistent with future ground control station activity requirements, support activity timing constraints, resource limits and activity priority guidelines.

  14. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  15. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  16. Air quality and future energy system planning

    NASA Astrophysics Data System (ADS)

    Sobral Mourao, Zenaida; Konadu, Dennis; Lupton, Rick

    2016-04-01

    Ambient air pollution has been linked to an increasing number of premature deaths throughout the world. Projected increases in demand for food, energy resources and manufactured products will likely contribute to exacerbate air pollution with an increasing impact on human health, agricultural productivity and climate change. Current events such as tampering emissions tests by VW car manufacturers, failure to comply with EU Air Quality directives and WHO guidelines by many EU countries, the problem of smog in Chinese cities and new industrial emissions regulations represent unique challenges but also opportunities for regulators, local authorities and industry. However current models and practices of energy and resource use do not consider ambient air impacts as an integral part of the planing process. Furthermore the analysis of drivers, sources and impacts of air pollution is often fragmented, difficult to understand and lacks effective visualization tools that bring all of these components together. This work aims to develop a model that links impacts of air quality on human health and ecosystems to current and future developments in the energy system, industrial and agricultural activity and patterns of land use. The model will be added to the ForeseerTM tool, which is an integrated resource analysis platform that has been developed at the University of Cambridge initially with funding from BP and more recently through the EPSRC funded Whole Systems Energy Modeling (WholeSEM) project. The basis of the tool is a set of linked physical models for energy, water and land, including the technologies that are used to transform these resources into final services such as housing, food, transport and household goods. The new air quality model will explore different feedback effects between energy, land and atmospheric systems with the overarching goal of supporting better communication about the drivers of air quality and to incorporate concerns about air quality into

  17. Enhanced distributed energy resource system

    DOEpatents

    Atcitty, Stanley; Clark, Nancy H.; Boyes, John D.; Ranade, Satishkumar J.

    2007-07-03

    A power transmission system including a direct current power source electrically connected to a conversion device for converting direct current into alternating current, a conversion device connected to a power distribution system through a junction, an energy storage device capable of producing direct current connected to a converter, where the converter, such as an insulated gate bipolar transistor, converts direct current from an energy storage device into alternating current and supplies the current to the junction and subsequently to the power distribution system. A microprocessor controller, connected to a sampling and feedback module and the converter, determines when the current load is higher than a set threshold value, requiring triggering of the converter to supply supplemental current to the power transmission system.

  18. Implementation of Alabama Resources Information System, ARIS

    NASA Technical Reports Server (NTRS)

    Herring, B. E.

    1978-01-01

    Development of ARIS - Alabama Resources Information System is summarized. Development of data bases, system simplification for user access, and making information available to personnel having a need to use ARIS or in the process of developing ARIS type systems are discussed.

  19. 25 CFR 161.200 - Is an Indian agricultural resource management plan required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan... WATER NAVAJO PARTITIONED LANDS GRAZING PERMITS General Provisions § 161.200 Is an Indian agricultural resource management plan required? (a) Yes, Navajo Partitioned Lands must be managed in accordance with...

  20. CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan

    SciTech Connect

    NELSON, R.L.

    2000-06-06

    The CH2M HILL Hanford Group, Inc. (CHG), Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project waste tank farm.

  1. 77 FR 11154 - Notice of Availability for the Eastern Interior Draft Resource Management Plan/Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... Bureau of Land Management Notice of Availability for the Eastern Interior Draft Resource Management Plan... prepared a Draft Resource Management Plan (RMP) and Environmental Impact Statement (EIS) for the Eastern..., subsistence, travel management, water quality, lands with wilderness characteristics, and wildlife. The...

  2. 75 FR 19990 - Lake Casitas Resource Management Plan, Ventura County, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Bureau of Reclamation Lake Casitas Resource Management Plan, Ventura County, CA AGENCY: Bureau of... of Availability of the Draft EIS was published in the Federal Register on July 28, 2008 (73 FR 43785... made available the Final EIS for the Lake Casitas Resource Management Plan (RMP). The RMP...

  3. Camera Ready Masters. B/M-1 Resource Assessment. B/M-2 Surveying. B/M-3 Tabulation. B/M-4 Selecting Program Goals. B/M-5 Producing CDU's. Career Planning Support System.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. Center for Vocational Education.

    This package of camera ready masters is one of a set of twelve documents describing the Career Planning Support System (CPSS) and its use. (CPSS is a comprehensive guidance program management system which (1) provides techniques to improve a high school's career guidance program, (2) focuses on the skills students need to make decisions about and…

  4. Incorporating water resources in integrated urban and regional planning

    NASA Astrophysics Data System (ADS)

    Baldwin, Claudia; Jeffrey, Paul

    2014-11-01

    Understanding the relationships between water and the landscapes, communities, and jurisdictions through which it flows has become an increasingly urgent task for science over recent years. The vital role played by water in both urban and rural economies, its function in supporting ecosystem services, the consequences of excess or deficit, and our increasing awareness of the aquatic environment's influence on quality of life all evidence the importance of refining our knowledge of the inter-dependencies between hydrological processes and social systems. At this resolution (catchments, regions, etc.), the importance of integrating land and water planning and the need for collaboration of multiple stakeholders are a genuinely holistic and interdisciplinary undertaking; providing opportunities for researchers from the natural and social sciences to generate insights which utilise understandings of fundamental processes and phenomena to inform and shape policy, planning, design and interventions. This is a relatively young but fast-growing area of science with theory and normative prescription in areas such as catchment management and water sensitive urban design driving a burgeoning science agenda. This Special Issue of the Journal of Hydrology showcases a suite of contributions from primarily developed countries around the globe which revel in this agenda. Our authors report work which tackles head-on the complexity and multi-dimensional nature of the problems and witnesses a growing confidence amongst the research community in crossing disciplinary and professional boundaries.

  5. Archaeological resource management plan of the Savannah River Archaeological Research Program

    SciTech Connect

    Not Available

    1989-12-01

    This Archaeological Resource management Plan addresses the future cultural resource management needs of the United States Department of Energy's (DOE) Savannah River Site (SRS). The archaeological information contained herein is based on prehistoric and historic archaeological syntheses prepared by the Savannah River Archaeological Research Program (SRARP) for the SRS. The syntheses also address future research directions that will facilitate better management of the cultural resources. This document is a prelude to a Programmatic Memorandum of Agreement (PMOA) which, in conjunction with this Archaeological Resource Management Plan, will assure SRS continued compliance with all applicable federal laws and regulations in concert with any DOE plans, policies and directives. 225 refs., 21 figs., 8 tabs.

  6. Towards integrated water resources management in Colombia: challenges and opportunities for spatial environmental planning

    NASA Astrophysics Data System (ADS)

    Salazar, Sergio; Hernández, Sebastián

    2015-04-01

    Only until 2010 was enacted the first national policy related to the integrated management of water resources in Colombia. In 2011 was established the Directorate for Integrated Water Resources Management within the Ministry of Environment and Sustainable Development. Between 2010 to 2013 were adopted the regulatory instruments to be developed within the hierarchical structure for spatial environmental planning around the water resources, considering both a transdisciplinary framework and a multi-ethnic and multi-participatory approach. In this context, there is a breakthrough in the development of strategic and tactic actions summarized as follows: i) technical guidelines or projects were developed for the spatial environmental planning at the macroscale river basins (i.e. Magdalena-Cauca river basin with 2.3 million hectares), meso-scale (river basins from 50.000 to 2 million hectares and aquifers) and local scale (catchments areas less than 50.000 hectares); ii) there is an advance in the knowledge of key hydrological processes in the basins of the country as well as actions to restore and preserve ecosystems essential for the regulation of water supply and ecosystem services; iii) demand characterization introducing regional talks with socio-economic stakeholders and promoting water efficiency actions; iv) water use regulation as a way for decontamination and achieving quality standards for prospective uses; v) introduction of risks analysis associated with water resources in the spatial environmental planning and establishment of mitigation and adaptation measures; vi) strengthening the monitoring network of water quality and hydrometeorological variables; vii) strengthening interactions with national and international research as well as the implementation of a national information system of water resources; viii) steps towards water governance with the introduction of socio-economic stakeholder in the spatial environmental planning and implementation of

  7. Saving Resources - Lesson plan of ESD in Geography

    NASA Astrophysics Data System (ADS)

    Iwamura, Takuya

    2010-05-01

    Geographical education has to perceive the world from diversified viewpoints by involving ESD (Education for Sustainable Development). This can be realized by teaching geography as an integrated science, including ESD that considers ecological, economic and social aspects.. In Japan especially, geographical education tends to emphasize the environmental aspects. The investigation of circumstances from diversified viewpoints helps to analyse the society scientifically and generates? the qualities of a global citizenship toward a sustainable society. And ESD aims at creating the values of sustainability, which is necessary for a global citizenship. In this context, I have developed the lesson plan of ESD in Geography at a secondary level.. Can advanced technologies foster sustainable development? The presentation shows the advanced technology-generated products and analyses the merits and failures with their effects on the global society. The examples of these products are hybrid cars and mobile phones. Cars are necessary for the mobility of our widespread modern society. On the other hand, it is also true that environmental pollution is becoming more serious by the increasing number of cars. We usually assume that economic development and environmental protection are contradictory. But hybrid cars which are coming to world attention now, have good gas mileage compared with normal cars, so they can conserve energy and cut down on the amount of exhaust at the same time. Mobile phones are necessary in business situations, as a tool that helps to communicate while moving. In addition, mobile phones are means that support the life of people living in sparsely populated areas like in Northern Europe. Here, we can curb costs for transmission facilities that were needed otherwise. There is one thing that underlies these advanced technology-generated products such as hybrid cars and mobile phones. The resource that makes the hybrid car technology and the miniaturization of

  8. The Montana Natural Resource Information System

    SciTech Connect

    Stimson, J.R. )

    1991-06-01

    The Montana Natural Resource Information System (NRIS) is a program created by the legislature to make sources of data and information on Montana's natural resource easily and readily accessible. The program serves business and industry, state and federal agencies, and private citizens by providing a clearinghouse and referral service to link data users with the best sources of information. In addition, NRIS helps coordinate among agencies and organizations that collect, manage, or use the same types of natural resource information to prevent duplication of effort and promote information sharing. The NRIS program consist of the following components: Natural Heritage Program, a computer-assisted inventory of Montana's biological resources emphasizing the locations of rare or endangered plant and animal species and biological communites; Water Information System, a program for locating all kinds of water resource information including data on surface water, groundwater, water quality, riparian areas, water rights, and climate data; Geographic Information System, which provides technical assistance for statewide GIS projects and to agencies developing in-house GIS capability and coordinates GIS data standards and sharing throughout the state; and Natural Resource Index, a geographical and subject area indexing system for existing data sources (published and unpublished sources).

  9. Career & Life Planning Portfolio Resource Book. Activities To Accompany the South Dakota Career and Life Planning Portfolio, 1999-2000.

    ERIC Educational Resources Information Center

    South Dakota State Dept. of Education, Pierre. Div. of Workforce and Career Preparation.

    This resource book provides several career development activities to accompany the South Dakota "My Career and Life Planning Portfolio," which is appended. The activities are arranged according to the following four folders found within the portfolio jacket: career and education planning; skills employers want; projects/work samples; and…

  10. Space station Platform Management System (PMS) replanning using resource envelopes

    NASA Technical Reports Server (NTRS)

    Bush, Joy Lee; Critchfield, Anna; Loomis, Audrey

    1987-01-01

    One of the responsibilities of the Space Station Platform Management System (PMS) is to maintain constraint-free, short-term plans for platform and free-flyer activities. Both the replanning function and the associated constraint-checking function are viewed as potentially requiring expert system assistance. The PMS Resource Envelope Scheduling System (PRESS) expert system, which is currently under development, is described. The PRESS capabilities will include the following: plan, replan, and perform constraint checking using resource envelopes resembling those required for telescience; initialize itself using the results fo a previous run; infer the replanning needs associated with a change in resource availability; allow the user to determine the level of interaction (including an advisory capability) with the system during execution; and generate both a graphic timeline and a report as output. The PRESS is being developed on an IBM PC/AT using TeKnowledge, Inc.'s M.1 expert system shell. The PRESS activity definitions and constraints are based on those defined for the Cosmic Background Explorer (COBE) mission scheduled for launch in early 1989.

  11. Planning In Rural Areas: Evaluation of The Land Resource.

    ERIC Educational Resources Information Center

    Carlson, Steven A.; Denney, Evan

    A rural land use project originated in the early 1970s when a landowner approached the University of Montana's Department of Geography asking for assistance in planning the use of more than 10,000 acres. The planning process evolved into four phases; the first three phases (biophysical assessment, capability analysis, and master planning) have…

  12. To Build or Not To Build: Planning and Building a Resources File.

    ERIC Educational Resources Information Center

    Reisinger, Carol; Barth, Rodney J.

    The process involved in planning, developing, and building a resources file is described in the context of a state education agency. The key decision points which confront the dissemination director are described, i.e., determining the client, the client's resource needs, and the availability of already existing resources. The steps involved in…

  13. Resources for Planning and Implementing School Desegregation. Bulletin Series in School Desegregation.

    ERIC Educational Resources Information Center

    Mornell, Eugene S.; Payne, Joseph F.

    The body of this paper consists of brief descriptions, in alphabetical order, of desegregation resources, mainly in California. For convenience, the categories of resources are divided into desegregation education, desegregation planning, integration, and financial resources. Groups such as the Anti-Defamation League of B'nai B'rith, the Task…

  14. Resources

    MedlinePlus

    ... palate - resources Colon cancer - resources Cystic fibrosis - resources Depression - resources Diabetes - resources Digestive disease - resources Drug abuse - resources Eating disorders - resources Elder care - resources Epilepsy - resources Family troubles - ...

  15. Planning status report, water resources appraisals for hydroelectric licensing: Cape Fear River Basin, North Carolina - South Carolina

    SciTech Connect

    Not Available

    1981-09-01

    The water resources of the Cape Fear River Basin which covers approximately 8570 square mile in eastern North Carolina and South Carolina are evaluated. Data are presented on existing and potential water resource development, on water uses, e.g., for irrigation, industrial and municipal water supplies, or in thermal power plant cooling systems, and on the status of hydro plant licensing. Past and current planning studies are summarized. The information presented is current as of September 1981. (LCL)

  16. Petroleum systems, resources of Southeast Asia, Australasia

    SciTech Connect

    Howes, J.

    1997-12-15

    The Southeast Asia-Australasia region has over 100 productive petroleum systems ranging in age from the Paleozoic to the Pliocene. Plate tectonics have played a fundamental role in controlling the distribution and character of the region`s petroleum systems. There is a clear division between those systems on the Eurasian plate and those on the Indo-Australian plate. The distribution of significant oil and gas resources is highly concentrated in just a few chrono-stratigraphic units. Early Tertiary Paleogene source rocks account for over 50% of the region`s in-place petroleum resources. This article summarizes the region`s systems and resources, and compares and contrasts some of their essential elements in Southeast Asia and Australasia. With average production of 3.2 million b/d of oil and 18 bscfd of gas, the region accounts for almost 6% of world oil and gas production.

  17. Natural Resource Information System. Remote Sensing Studies.

    ERIC Educational Resources Information Center

    Leachtenauer, J.; And Others

    A major design objective of the Natural Resource Information System entailed the use of remote sensing data as an input to the system. Potential applications of remote sensing data were therefore reviewed and available imagery interpreted to provide input to a demonstration data base. A literature review was conducted to determine the types and…

  18. Low-Earth-Orbiter resource allocation and capacity planning for the DSN using LEO4CAST

    NASA Technical Reports Server (NTRS)

    Fox, G.; Borden, C.

    1994-01-01

    The Deep Space Network provides tracking and communication services for a number of U.S. and international low-Earth-orbiting (LEO) and near-Earth missions. This service is supplied by the 26-m subnet (located at each of the DSN complexes), the 9-m and the 34-m Antenna Research System antennas at Goldstone, and the 11-m antennas (following the orbital VLBI mission). An increasing number of LEO missions are planned for DSN support, which will result in increasingly complex ground resource allocation and mission support trades. To support TDA decision making on mission support and cost-effective ground system evolution for this 26-m subnet, LEO4CAST has been developed. LEO4CAST is a tool that uses statistical approaches to provide useful information for long-term ground system capacity planning and near-term resource allocation (prior to detailed time-of-day scheduling). LEO4CAST is currently beta-test software and is being exercised by both the Office of Telecommunications and Data Acquisition (TDA) and the JPL Systems Division.

  19. 20 CFR 416.1260 - Special resource provision for recipients under a State plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... under a State plan. 416.1260 Section 416.1260 Employees' Benefits SOCIAL SECURITY ADMINISTRATION... plan as approved under the provisions of 45 CFR Ch. II as in effect in October 1972. ... resource provision for recipients under a State plan. (a) General. In the case of any individual...

  20. 20 CFR 416.1260 - Special resource provision for recipients under a State plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... under a State plan. 416.1260 Section 416.1260 Employees' Benefits SOCIAL SECURITY ADMINISTRATION... plan as approved under the provisions of 45 CFR Ch. II as in effect in October 1972. ... resource provision for recipients under a State plan. (a) General. In the case of any individual...

  1. Water Foundations Teachers Guide. The Science of Florida's Water Resources: Lesson Plans for Teachers and Students.

    ERIC Educational Resources Information Center

    2001

    This document features lesson plans for teachers and students on Florida's water resources. The guide is divided into four grade levels: K-2, 3-5, 6-8, and 9-12. Each grade level includes objectives, guides, and five lesson plans. K-2 lesson plans include: (1) "We Are Water"; (2) "Why Water is Extra Special"; (3) "Water's Changing Shapes"; (4)…

  2. Temporal and Resource Reasoning for Planning, Scheduling and Execution in Autonomous Agents

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Hunsberger, Luke; Tsamardinos, Ioannis

    2005-01-01

    This viewgraph slide tutorial reviews methods for planning and scheduling events. The presentation reviews several methods and uses several examples of scheduling events for the successful and timely completion of the overall plan. Using constraint based models the presentation reviews planning with time, time representations in problem solving and resource reasoning.

  3. Geothermal resource area 11, Clark County area development plan

    SciTech Connect

    Pugsley, M.

    1981-01-01

    Geothermal Resource Area 11 includes all of the land in Clark County, Nevada. Within this area are nine geothermal anomalies: Moapa Area, Las Vegas Valley, Black Canyon, Virgin River Narrows, Roger's Springs, Indian Springs, White Rock Springs, Brown's Spring, and Ash Creek Spring. All of the geothermal resources in Clark County have relatively low temperatures. The highest recorded temperature is 145{sup 0}F at Black Canyon. The temperatures of the other resources range from 70 to 90{sup 0}F. Because of the low temperature of the resources and, for the most part, the distance of the resources from any population base, the potential for the development of the resources are considered to be somewhat limited.

  4. Expert knowledge based modeling for integrated water resources planning and management in the Zayandehrud River Basin

    NASA Astrophysics Data System (ADS)

    Safavi, Hamid R.; Golmohammadi, Mohammad H.; Sandoval-Solis, Samuel

    2015-09-01

    This study highlights the need for water resource planning and management using expert knowledge to model known extreme hydrologic variability in complex hydrologic systems with lack of data. The Zayandehrud River Basin in Iran is used as an example of complex water system; this study provides a comprehensive description of the basin, including its water demands (municipal, agricultural, industrial and environmental) and water supply resources (rivers, inter-basin water transfer and aquifers). The objective of this study is to evaluate near future conditions of the basin (from Oct./2015 to Sep./2019) considering the current water management policies and climate change conditions, referred as Baseline scenario. A planning model for the Zayandehrud basin was built to evaluate the Baseline scenario, the period of hydrologic analysis is 21 years, (from Oct./1991 to Sep./2011); it was calibrated for 17 years and validated for 4 years using a Historic scenario that considered historic water supply, infrastructure and hydrologic conditions. Because the Zayandehrud model is a planning model and not a hydrologic model (rainfall-runoff model), an Adaptive Network-based Fuzzy Inference System (ANFIS) is used to generate synthetic natural flows considering temperature and precipitation as inputs. This model is an expert knowledge and data based model which has the benefits of Artificial Neural Networks (ANN) and Fuzzy Inference Systems (FIS). Outputs of the ANFIS model were compared to the Historic scenario results and are used in the Baseline scenario. Three metrics are used to evaluate the goodness of fit of the ANFIS model. Water supply results of the Baseline scenario are analyzed using five performance criteria: time-based and volumetric reliability, resilience, vulnerability and maximum deficit. One index, the Water Resources Sustainability Index is used to summarize the performance criteria results and to facilitate comparison among trade-offs. Results for the Baseline

  5. The role of integrated resource planning, environmental externalities, and anticipation of future regulation in compliance planning under the Clean Air Act Amendments of 1990

    SciTech Connect

    Bernow, S.; Biewald, B.; Wulfsberg, K.

    1993-07-01

    Utilities are developing sulfur dioxide (SO{sub 2}) emission compliance plans to meet limitations of the Clean Air Act Amendments of 1990 (CAAA). Compliance plans will have long-term effects on resource selection, fuel choice, and system dispatch. Use of integrated resource planning (IRP) is necessary to ensure compliance plans are consistent with the overall societal goals. In particular, environmental externalities must be integrated with the compliance planning process. The focus of the CAAA is on air pollution reduction, specifically acid gases and toxics, and attainment of National Ambient Air Quality Standards (NAAQS) for criteria pollutants. Title IV specifically focuses on sulfur dioxide with a national allowance trading system, while further regulation of toxics and nitrogen oxides is slated for additional study. Yet, compliance planning based narrowly upon today`s environmental regulations could fail to meet the broad goals of IRP if a larger array of environmental externalities is excluded from the analysis. Compliance planning must consider a broad range of environmental effects from energy production and use to (1) protect society`s long-term stake in environmental quality, and (2) ensure that today`s plans are rich enough to accommodate potential changes in regulation and national environmental goals. The explicit recognition of environmental effects, such as those associated with CO{sub 2} release, will result in prudent compliance plans that take advantage of current opportunities for pollution avoidance and have long-term viability in the face of regulatory change. By including such considerations, the mix of resources acquired and operated (supply and demand, existing and new, conventional and renewable, fuel type and fuel quality, pollution control, and dispatch protocols) will be robust and truly least-cost.

  6. NASA's In-Situ Resource Utilization Project: Current Accomplishments and Exciting Future Plans

    NASA Technical Reports Server (NTRS)

    Larson, William E.; Sanders, Gerald B.; Sacksteder, Kurt R.

    2010-01-01

    The utilization of Space resources has been identified in publications for over 40 years for its potential as a "game changing" technology for the human exploration of Space. It is called "game changing" because of the mass leverage possible when local resources at the exploration destination arc used to reduce or even eliminate resources that are brought from the Earth. NASA, under the Exploration Technology Development Program has made significant investments in the development of Space resource utilization technologies as a part of the In-Situ Resource Utilization (ISRU) project. Over the last four years, the ISRU project has taken what was essentially an academic topic with lots of experimentation but little engineering and produced near-full-scale systems that have been demonstrated. In 2008 & again in early 2010, systems that could produce oxygen from lunar soils (or their terrestrial analogs) were tested at a lunar analog site on a volcano in Hawaii. These demonstrations included collaborations with International Partners that made significant contributions to the tests. The proposed federal budget for Fiscal Year 2011 encourages the continued development and demonstration of ISRU. However it goes beyond what the project is currently doing and directs that the scope of the project be expanded to cover destinations throughout the inner solar system with the potential for night demonstrations. This paper will briefly cover the past accomplishments of the ISRU project then move to a di scussion of the plans for the project's future as NASA moves to explore a new paradigm for Space Exploration that includes orbital fuel depots and even refueling on other planetary bodies in the solar system.

  7. Vermont Water Resources Research Center five-year plan for water resources research and development

    SciTech Connect

    Long, M.; Cassell, E.A.

    1980-10-01

    Vermont has identified eight priority research areas: acid precipitation, allocation of water resources, data base lakes and wetlands management, land runoff, management of toxic and hazardous materials, and waste water management and drinking water supply. Vermont has an average annual precipitation of 42 inches and is generally decentralized both culturally and hydrologically. This decentralization presents special management problems due to the economic limitations on small communities in the provision of facilities for water supply and waste water treatment. Some problems such as acid precipitation and toxic and hazardous materials management originate outside of the state and need regional research efforts. Energy production significantly impacts Vermont's water use with 70% of total use since 1975 being attributed to cooling at electric production facilities. Major factors in the state's five-year plan are vigorous technology transfer and information dissemination efforts. A generic listing of research projects and technology transfer activities considered necessary for Vermont is presented along with a table showing the interrelationships of the various program elements and the research projects. 21 references, 4 figures, 9 tables.

  8. Toward an integrated management plan of the Djoudj Park water resources: Senegal River mouth.

    PubMed

    Fall, Ousmane; Hori, Nobuyuki; Kan, Hironobu; Diop, Mbarack

    2003-01-01

    A new approach was needed to preserve the biodiversity of the Djoudj Park within a context marked by many constraints: drought, regulation of its hydrologic system, and anthropogenic pressure. The local management plan developed in this paper aims at the responsible management and fair distribution of the available water resources in the Djoudj Park to provide a balanced response to conservation issues and the growing needs of the local communities. The opposition between an administration determined to exercise its power and the confidence of local people weary of being stripped of their rights and cultural assets required the setting up of a consensual management plan. This plan would provide a means to determine the timing and the number of sluice gates to operate, based on an efficient command of the needs for water for each activity in the park and its surroundings. This tool will allow the park authority to take full cognizance of the needs and opinions of all interest groups but also their limits while keeping the essential functions of this wetland. It is also suggested that institutional and administrative reform be carried out to associate local populations in the definition and implementation of criteria for an integrated management of the Djoudj resources. PMID:12447572

  9. [Human resources for local health systems].

    PubMed

    Linger, C

    1989-01-01

    The economic and social crises affecting Latin America have had a profound social and political effect on its structures. This paper analyzes this impact from 2 perspectives: 1) the impact on the apparatus of the state, in particular on its health infra-structures; and 2) the direction of the democratic process in the continent and the participatory processes of civil societies. The institutionalization of the Local Health Systems (SILOS) is an effort to analyze the problem from within the health sector and propose solutions. This paper discusses the issues of human resource development in health systems; training in human resource development and human resource development in local health care systems. There are 3 strategies used to change health systems: 1) The judicial-political system: The state's apparatus 2) The political-administrative system: the national health care system; and 3) the political-operative system: local health care systems. To assure implementation of SILOS there are 4 steps to be followed: 1) create political conditions that allow the transformation and development of local health systems; 2) development of high-level institutional and political initiatives to develop health care networks; 3) offer key players institutional space and social action to develop the SILOS process; 4) rapidly develop SILOS in regions to assure its integration with other development efforts. The labor force in the health sector and organized communities play critical roles in proposing and institutionalizing health programs. PMID:2766984

  10. Information Resources Management Long Range Plan, FY 1995-1999

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Major IRM Program Accomplishments for FY 1993; Information Collection Budget; Summary of Computer Security Plans; Appendix: Acronym List.

  11. Demand-Side Management and Integrated Resource Planning: Findings from a Survey of 24 Electric Utilities

    SciTech Connect

    Schweitzer, M.

    1991-01-01

    Integrated resource planning differs from traditional utility planning practices primarily in its increased attention to demand-side management (DSM) programs and its integration of supply- and demand-side resources into a combined resource portfolio. This report details the findings from an Oak Ridge National Laboratory (ORNL) survey of 24 electric utilities that have well-developed integrated planning processes. These utilities account for roughly one-third of total capacity, electricity generation, and DSM-program expenditures nationwide. The ORNL survey was designed to obtain descriptive data on a national sample of utilities and to test a number of hypothesized relationships between selected utility characteristics and the mix of resources selected for the integrated plan, with an emphasis on the use of DSM resources and the processes by which they are chosen. The survey solicited information on each utility's current and projected resource mix, operating environment, procedures used to screen potential DSM resources, techniques used to obtain public input and to integrate supply- and demand-side options into a unified plan, and procedures used in the final selection of resources for the plan.

  12. Critical Success Factors for the Implementation of PeopleSoft Enterprise Resource Planning in a Public Organization

    ERIC Educational Resources Information Center

    Mukkamala, Hemanth K.

    2013-01-01

    Organizations of different sizes are changing their information technology (IT) strategies in order to achieve efficiency and effectiveness in today's global economy and to integrate their internal and external information by implementing PeopleSoft Enterprise Resource Planning (ERP) systems. The literature has case studies of successful and…

  13. The Area Resource File: A Manpower Planning and Research Tool.

    ERIC Educational Resources Information Center

    Williams, Wilbert

    The computerized data file, the Area Resource File (ARF), was originally used in determining locations of nationwide Health Education Centers (AHEC). It has been more recently employed in general and comparative geographic statistical analysis of health resources in counties throughout the country. This aid contains seven general categories of…

  14. Solar Energy Technology: A Curriculum Planning and Resource Guide.

    ERIC Educational Resources Information Center

    Thomas-Gordon, Sandy L.; Spetz, Sally H.

    This curriculum resource guide, one of seven developed by the State of Illinois to present information on new and emerging curricula existing in the nation, can be used as a basis for local educators to determine the resources needed to offer solar technology curricula and to initiate curriculum development at the local level. Chapters 1 and 2…

  15. Information Resource Management Strategic Plan, FY 2007-2011

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    The Chief Information Officer (CIO) at the U.S. Department of Education (ED) has primary responsibility to ensure that Information Technology (IT) is acquired and information resources are managed in a manner consistent with statutory, regulatory, and Departmental requirements and priorities. This Department Information Resource Management (IRM)…

  16. Swine Confinement Management: A Curriculum Planning and Resource Guide.

    ERIC Educational Resources Information Center

    Heath, Walter D.; Spetz, Sally H.

    This curriculum resource guide, one of seven developed by the State of Illinois to present information on new and emerging curricula existing in the nation, can be used as a basis for local educators to determine the resources needed to offer swine confinement management curricula and to initiate curriculum development at the local level. Chapters…

  17. Biomedical Equipment Technclogy: A Curriculum Planning Resource Guide.

    ERIC Educational Resources Information Center

    Spetz, Sally H.

    This curriculum resource guide, one of seven developed by the State of Illinois to present information on new and emerging curricula existing in the nation, can be used as a basis for local educators to determine the resources needed to offer biomedical equipment technician curricula and to initiate curriculum development at the local level.…

  18. Resources

    MedlinePlus

    ... Diabetes - resources Digestive disease - resources Drug abuse - resources Eating disorders - resources Elder care - resources Epilepsy - resources Family troubles - resources Gastrointestinal disorders - resources Hearing impairment - resources ...

  19. A Supporting Framework of Online Technology Resources for Lesson Planning

    ERIC Educational Resources Information Center

    He, Wu; Hartley, Kendall

    2010-01-01

    Lesson planning serves as a key means for ensuring the quality of instruction. In an effort to facilitate and improve the literature related to lesson planning, this paper proposes a framework which integrates online lesson planners, databases, case libraries, and Web 2.0 tools such as blogs and wikis to support both pre-service and in-service…

  20. Systemic trade risk of critical resources.

    PubMed

    Klimek, Peter; Obersteiner, Michael; Thurner, Stefan

    2015-11-01

    In the wake of the 2008 financial crisis, the role of strongly interconnected markets in causing systemic instability has been increasingly acknowledged. Trade networks of commodities are susceptible to cascades of supply shocks that increase systemic trade risks and pose a threat to geopolitical stability. We show that supply risk, scarcity, and price volatility of nonfuel mineral resources are intricately connected with the structure of the worldwide trade networks spanned by these resources. At the global level, we demonstrate that the scarcity of a resource is closely related to the susceptibility of the trade network with respect to cascading shocks. At the regional level, we find that, to some extent, region-specific price volatility and supply risk can be understood by centrality measures that capture systemic trade risk. The resources associated with the highest systemic trade risk indicators are often those that are produced as by-products of major metals. We identify significant strategic shortcomings in the management of systemic trade risk, in particular in the European Union. PMID:26702431

  1. Systemic trade risk of critical resources

    PubMed Central

    Klimek, Peter; Obersteiner, Michael; Thurner, Stefan

    2015-01-01

    In the wake of the 2008 financial crisis, the role of strongly interconnected markets in causing systemic instability has been increasingly acknowledged. Trade networks of commodities are susceptible to cascades of supply shocks that increase systemic trade risks and pose a threat to geopolitical stability. We show that supply risk, scarcity, and price volatility of nonfuel mineral resources are intricately connected with the structure of the worldwide trade networks spanned by these resources. At the global level, we demonstrate that the scarcity of a resource is closely related to the susceptibility of the trade network with respect to cascading shocks. At the regional level, we find that, to some extent, region-specific price volatility and supply risk can be understood by centrality measures that capture systemic trade risk. The resources associated with the highest systemic trade risk indicators are often those that are produced as by-products of major metals. We identify significant strategic shortcomings in the management of systemic trade risk, in particular in the European Union. PMID:26702431

  2. Program, Planning, Budgeting Systems for Educators. Volume I: An Instructional Outline. Leadership Series No. 18.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. Center for Vocational and Technical Education.

    Planning, Programming, Budgeting System (PPBS) includes concepts and techniques for resource allocation decision making for rational and effective programming. Most federal agencies use PPBS for the development, analysis and presentation of resource needs. Traditional methods of budgeting focus primarily on resource inputs; PPBS focuses on both…

  3. Tank waste remediation system environmental program plan

    SciTech Connect

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  4. School Planning, Evaluation and Communication System (SPECS).

    ERIC Educational Resources Information Center

    Flocco, Edward C.

    A comprehensive school planning tool is available from General Learning Corporation and the Center for the Advanced Study of Educational Administration at the University of Oregon. This School Planning, Evaluation and Communication System (SPECS) provides a deliverable system of training, implementation strategies and materials and technical…

  5. AOIPS water resources data management system

    NASA Technical Reports Server (NTRS)

    Merritt, E. S.; Shotwell, R. L.; Place, M. C.; Belknap, N. J.

    1976-01-01

    A geocoded data management system applicable for hydrological applications was designed to demonstrate the utility of the Atmospheric and Oceanographic Information Processing System (AOIPS) for hydrological applications. Within that context, the geocoded hydrology data management system was designed to take advantage of the interactive capability of the AOIPS hardware. Portions of the Water Resource Data Management System which best demonstrate the interactive nature of the hydrology data management system were implemented on the AOIPS. A hydrological case study was prepared using all data supplied for the Bear River watershed located in northwest Utah, southeast Idaho, and western Wyoming.

  6. Implementation of two new resource management information systems in Australia

    NASA Astrophysics Data System (ADS)

    Kessell, Stephen R.; Good, Roger B.; Hopkins, Angas J. M.

    1984-05-01

    This paper describes the development and implementation of PREPLAN, A Pristine Environment Planning Language and Simulator, for two conservation areas in Australia, Kosciusko National Park (New South Wales) and Tutanning Nature Reserve (Western Australia). PREPLAN was derived from the North American gradient modeling systems and the Forest Planning Language and Simulator (FORPLAN), but includes unique characteristics not previously available. PREPLAN includes an integrated resource management data base, modules for predicting site-specific vegetation, fuels, animals, fire behavior, and fire effects, and an English language instruction set. PREPLAN was developed specifically to provide available information and understanding of ecosystems to managers in a readily accessible and usable form, and to provide the motivation to conduct additional required research projects. An evaluation of the system's advantages and limitations is presented, and the way the utilization of such systems is improving natural area decision making throughout Australia is discussed.

  7. Establishment of a Resources Library System.

    ERIC Educational Resources Information Center

    Givens, Elizabeth

    The purpose of the Resources Development Internship Project was to catalog the collection of the U.S. Bureau of Land Management Montana State Office (MSO) library, which consisted of approximately 1,400 volumes of diverse library materials. Other objectives were to improve access to the materials, and develop a general system of library operation…

  8. Linking Assessment to Decision Making in Water Resources Planning - Decision Making Frameworks and Case Study Evaluations

    NASA Astrophysics Data System (ADS)

    Broman, D.; Gangopadhyay, S.; Simes, J.

    2015-12-01

    Climate assessments have become an accepted and commonly used component of long term water management and planning. There is substantial variation in the methods used in these assessments; however, managers and decision-makers have come to value their utility to identify future system limitations, and to evaluate future alternatives to ensure satisfactory system performance. A new set of decision-making frameworks have been proposed, including robust decision making (RDM), and decision scaling, that directly address the deep uncertainties found in both future climate, and non-climatic factors. Promising results have been obtained using these new frameworks, offering a more comprehensive understanding of future conditions leading to failures, and identification of measures to address these failures. Data and resource constraints have limited the use of these frameworks within the Bureau of Reclamation. We present here a modified framework that captures the strengths of previously proposed methods while using a suite of analysis tool that allow for a 'rapid climate assessment' to be performed. A scalable approach has been taken where more complex tools can be used if project resources allow. This 'rapid assessment' is demonstrated through two case studies on the Santa Ana and Colorado Rivers where previous climate assessments have been completed. Planning-level measures are used to compare how decision making is affected when using this new decision making framework.

  9. Review of the Water Resources Information System of Argentina

    USGS Publications Warehouse

    Hutchison, N.E.

    1987-01-01

    A representative of the U.S. Geological Survey traveled to Buenos Aires, Argentina, in November 1986, to discuss water information systems and data bank implementation in the Argentine Government Center for Water Resources Information. Software has been written by Center personnel for a minicomputer to be used to manage inventory (index) data and water quality data. Additional hardware and software have been ordered to upgrade the existing computer. Four microcomputers, statistical and data base management software, and network hardware and software for linking the computers have also been ordered. The Center plans to develop a nationwide distributed data base for Argentina that will include the major regional offices as nodes. Needs for continued development of the water resources information system for Argentina were reviewed. Identified needs include: (1) conducting a requirements analysis to define the content of the data base and insure that all user requirements are met, (2) preparing a plan for the development, implementation, and operation of the data base, and (3) developing a conceptual design to inform all development personnel and users of the basic functionality planned for the system. A quality assurance and configuration management program to provide oversight to the development process was also discussed. (USGS)

  10. Comprehensive Planning for an Education System. Report #2, Definition Summary. Appendices, Volume 1. Fort Lincoln New Town Education System.

    ERIC Educational Resources Information Center

    General Learning Corp., Washington, DC.

    This appendices reports on the definition phase activities of planning for the Fort Lincoln New Town education system. Included are complete reports on the community resources survey and the demographic survey. The General Learning Corporation planning documents are presented in tabular format. A community planning timetable is outlined and the…

  11. Implementing Natural Resources Cadastral Plan in Pasargadae District of Iran by Using Quick Bird Images

    NASA Astrophysics Data System (ADS)

    Azhdari, G. H.; Deilami, K.; Firooznia, E.

    2015-12-01

    Natural Resources are essential for security and sustainable development of each country. Therefore, in order to reach sustainable development, conservation as well as optimum utilization of natural resources, executing of natural resources cadastral plan is necessary and essential. Governments conduct lands management in Iran, so there is a need for comprehensive plan with arranged program for best evaluation. In this research as a pilot, Pasargadae city is opted. Pasargadae region is located in north-east of Shiraz in Fars province with Latitude and longitude of 30° 15 ´ 53 ° N and 53° 13 ´ 29 ° E respectively. In order to generate the cadastral maps, Firstly, images from QuickBird satellite with 50-60 centimeters resolution were georeferenced by utilizing ground control points with accurate GPS coordinates. In addition to satellite images, old paper maps with 1:10000 scale in local coordinate system from agriculture ministry in 1963 were digitized according to 1:25000 scale map from army geographical organization with AutoCad software. Beside, paper maps with 1:50000 scale and Google Earth were used to find the changes during time. All the above maps were added to QuickBird images as new layers by using ArcMap software. These maps also were utilized to determine the different land-uses. Thus, by employing ArcMap software lands divide into 2 groups: firstly, lands with official document, which is owned by either natural or legal persons, and secondly national lands under different uses such as forestry, range management and desertification plans. Consequently, the generation of cadastral maps leads to better difference between private and national lands. In addition, producing cadastral maps prevent the destruction and illegal possession of natural lands by individuals.

  12. A system management methodology for building successful resource management systems

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller; Willoughby, John K.

    1989-01-01

    This paper presents a system management methodology for building successful resource management systems that possess lifecycle effectiveness. This methodology is based on an analysis of the traditional practice of Systems Engineering Management as it applies to the development of resource management systems. The analysis produced fifteen significant findings presented as recommended adaptations to the traditional practice of Systems Engineering Management to accommodate system development when the requirements are incomplete, unquantifiable, ambiguous and dynamic. Ten recommended adaptations to achieve operational effectiveness when requirements are incomplete, unquantifiable or ambiguous are presented and discussed. Five recommended adaptations to achieve system extensibility when requirements are dynamic are also presented and discussed. The authors conclude that the recommended adaptations to the traditional practice of Systems Engineering Management should be implemented for future resource management systems and that the technology exists to build these systems extensibly.

  13. Enroute flight planning: The design of cooperative planning systems

    NASA Technical Reports Server (NTRS)

    Smith, Philip J.; Layton, Chuck; Mccoy, Elaine

    1990-01-01

    Design concepts and principles to guide in the building of cooperative problem solving systems are being developed and evaluated. In particular, the design of cooperative systems for enroute flight planning is being studied. The investigation involves a three stage process, modeling human performance in existing environments, building cognitive artifacts, and studying the performance of people working in collaboration with these artifacts. The most significant design concepts and principles identified thus far are the principle focus.

  14. Environmental guidelines for development of Cultural Resource Management plans. Final report

    SciTech Connect

    1995-08-01

    The purpose of this document is to provide guidelines to the DOE field managements with responsibility for the development of an individual Cultural Resource Management Plan for each DOE facility and program.

  15. AOIPS water resources data management system

    NASA Technical Reports Server (NTRS)

    Vanwie, P.

    1977-01-01

    The text and computer-generated displays used to demonstrate the AOIPS (Atmospheric and Oceanographic Information Processing System) water resources data management system are investigated. The system was developed to assist hydrologists in analyzing the physical processes occurring in watersheds. It was designed to alleviate some of the problems encountered while investigating the complex interrelationships of variables such as land-cover type, topography, precipitation, snow melt, surface runoff, evapotranspiration, and streamflow rates. The system has an interactive image processing capability and a color video display to display results as they are obtained.

  16. 75 FR 10811 - Notice of Intent To Prepare a Resource Management Plan Amendment to the Roswell Resource...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ...In compliance with the National Environmental Policy Act of 1969 (NEPA), as amended, the Federal Land Policy and Management Act of 1976 (FLPMA), as amended, and the Omnibus Public Land Management Act of 2009, the Bureau of Land Management (BLM) Roswell Field Office, Roswell, New Mexico, intends to prepare an amendment to the Roswell Resource Management Plan (RMP) with an associated......

  17. Scenario-based water resources planning for utilities in the Lake Victoria region

    NASA Astrophysics Data System (ADS)

    Mehta, Vishal K.; Aslam, Omar; Dale, Larry; Miller, Norman; Purkey, David R.

    Urban areas in the Lake Victoria (LV) region are experiencing the highest growth rates in Africa. As efforts to meet increasing demand accelerate, integrated water resources management (IWRM) tools provide opportunities for utilities and other stakeholders to develop a planning framework comprehensive enough to include short term (e.g. landuse change), as well as longer term (e.g. climate change) scenarios. This paper presents IWRM models built using the Water Evaluation And Planning (WEAP) decision support system, for three towns in the LV region - Bukoba (Tanzania), Masaka (Uganda), and Kisii (Kenya). Each model was calibrated under current system performance based on site visits, utility reporting and interviews. Projected water supply, demand, revenues and costs were then evaluated against a combination of climate, demographic and infrastructure scenarios up to 2050. Our results show that water supply in all three towns is currently infrastructure limited; achieving existing design capacity could meet most projected demand until 2020s in Masaka beyond which new supply and conservation strategies would be needed. In Bukoba, reducing leakages would provide little performance improvement in the short-term, but doubling capacity would meet all demands until 2050. In Kisii, major infrastructure investment is urgently needed. In Masaka, streamflow simulations show that wetland sources could satisfy all demand until 2050, but at the cost of almost no water downstream of the intake. These models demonstrate the value of IWRM tools for developing water management plans that integrate hydroclimatology-driven supply to demand projections on a single platform.

  18. Amarillo National Resource Center for Plutonium 1999 plan

    SciTech Connect

    1999-01-30

    The purpose of the Amarillo National Resource Center for Plutonium is to serve the Texas Panhandle, the State of Texas and the US Department of Energy by: conducting scientific and technical research; advising decision makers; and providing information on nuclear weapons materials and related environment, safety, health, and nonproliferation issues while building academic excellence in science and technology. This paper describes the electronic resource library which provides the national archives of technical, policy, historical, and educational information on plutonium. Research projects related to the following topics are described: Environmental restoration and protection; Safety and health; Waste management; Education; Training; Instrumentation development; Materials science; Plutonium processing and handling; and Storage.

  19. Sandia National Laboratories, California sewer system management plan.

    SciTech Connect

    Holland, Robert C.

    2010-02-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Site Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan. Elements of this Plan are under development in accordance with the SWRCB's schedule.

  20. Space Resource Utilization: Near-Term Missions and Long-Term Plans for Human Exploration

    NASA Technical Reports Server (NTRS)

    Sanders, Gerald B.

    2015-01-01

    NASA's Human Exploration Plans: A primary goal of all major space faring nations is to explore space: from the Earth with telescopes, with robotic probes and space telescopes, and with humans. For the US National Aeronautics and Space Administration (NASA), this pursuit is captured in three important strategic goals: 1. Ascertain the content, origin, and evolution of the solar system and the potential for life elsewhere, 2. Extend and sustain human activities across the solar system (especially the surface of Mars), and 3. Create innovative new space technologies for exploration, science, and economic future. While specific missions and destinations are still being discussed as to what comes first, it is imperative for NASA that it foster the development and implementation of new technologies and approaches that make space exploration affordable and sustainable. Critical to achieving affordable and sustainable human exploration beyond low Earth orbit (LEO) is the development of technologies and systems to identify, extract, and use resources in space instead of bringing everything from Earth. To reduce the development and implementation costs for space resource utilization, often called In Situ Resource Utilization (ISRU), it is imperative to work with terrestrial mining companies to spin-in/spin-off technologies and capabilities, and space mining companies to expand our economy beyond Earth orbit. In the last two years, NASA has focused on developing and implementing a sustainable human space exploration program with the ultimate goal of exploring the surface of Mars with humans. The plan involves developing technology and capability building blocks critical for sustained exploration starting with the Space Launch System (SLS) and Orion crew spacecraft and utilizing the International Space Station as a springboard into the solar system. The evolvable plan develops and expands human exploration in phases starting with missions that are reliant on Earth, to

  1. The Archimedes 2 mechanical assembly planning system

    SciTech Connect

    Kaufman, S.G.; Wilson, R.H.; Jones, R.E.; Calton, T.L.; Ames, A.L.

    1996-03-01

    We describe the implementation and performance of Archimedes 2, an integrated mechanical assembly planning system. Archimedes 2 includes two planners, two assembly sequence animation facilities, and an associated robotic workcell. Both planners use full 3 dimensional data. A rudimentary translator from high level assembly plans to control code for the robotic workcell has also been implemented. We can translate data from a commercial CAD system into input data for the system, which has allowed us to plan assembly sequences for many industrial assemblies. Archimedes 2 has been used to plan sequences for assemblies consisting of 5 to 109 parts. We have also successfully taken a CAD model of an assembly, produced an optimized assembly sequence for it, and translated the plan into robot code, which successfully assembles the device specified in the model.

  2. 10 CFR 905.10 - Who must comply with the integrated resource planning and reporting regulations in this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Who must comply with the integrated resource planning and reporting regulations in this subpart? 905.10 Section 905.10 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND... planning and reporting regulations in this subpart? (a) Integrated resource plans (IRP) and...

  3. 10 CFR 905.10 - Who must comply with the integrated resource planning and reporting regulations in this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Who must comply with the integrated resource planning and reporting regulations in this subpart? 905.10 Section 905.10 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND... planning and reporting regulations in this subpart? (a) Integrated resource plans (IRP) and...

  4. PLAN-IT: Scheduling assistant for solar system exploration

    NASA Technical Reports Server (NTRS)

    Dias, William C.; Henricks, Julia A.; Wong, Jennifer C.

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered.

  5. PLAN-IT - Scheduling assistant for solar system exploration

    NASA Technical Reports Server (NTRS)

    Dias, William C.; Henricks, Julia A.; Wong, Jennifer C.

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered.

  6. Orbital Express mission operations planning and resource management using ASPEN

    NASA Astrophysics Data System (ADS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-04-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less labor-power rises. Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Like a tow-truck delivering gas to a car on the road, the "servicing" satellite of OE had to find the "client" from several kilometers away, connect directly to the client, and transfer fluid (or a battery) autonomously, while on earth-orbit. The mission met 100% of its success criteria, and proved that autonomous satellite servicing is now a reality for space operations. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. As the constraints for execution could change weekly, daily, and even hourly, the tools used create the mission execution plans needed to be flexible and adaptable to many different kinds of changes. At the same time, the hard constraints of the plans needed to be maintained and satisfied. The Automated Scheduling and Planning Environment (ASPEN) tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, an overview of the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the NASA's Earth Observing One mission's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  7. ERIPS: Earth Resource Interactive Processing System

    NASA Technical Reports Server (NTRS)

    Quinn, M. J.

    1975-01-01

    The ERIPS is an interactive computer system used in the analysis of remotely sensed data. It consists of a set of software programs which are executed on an IBM System/360 Model 75J computer under the direction of a trained analyst. The software was a derivative of the Purdue LARSYS program and has evolved to include an extensive pattern recognition system and a number of manipulative, preprocessing routines which prepare the imagery for the pattern recognition application. The original purpose of the system was to analyze remotely sensed data, to develop and perfect techniques to process the data, and to determine the feasibility of applying the data to significant earth resources problems. The System developed into a production system. Error recovery and multi-jobbing capabilities were added to the system.

  8. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  9. Web-Based Resources for K-12 Instructional Planning.

    ERIC Educational Resources Information Center

    Lee, Bernard; Small, Ruth V.

    1999-01-01

    Identifies and describes different types of educational World Wide Web resources, including "Ask-an-Expert" services, as well as government, state-based, individual, and commercial sites. Considers limitations of the Web; discusses educators' information literacy; and describes the Gateway to Educational Materials (GEM) project of the ERIC…

  10. A scientific operations plan for the NASA space telescope. [ground support systems, project planning

    NASA Technical Reports Server (NTRS)

    West, D. K.; Costa, S. R.

    1975-01-01

    A ground system is described which is compatible with the operational requirements of the space telescope. The goal of the ground system is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of space telescope science, or jeopardizing the safety of the space telescope in orbit. The resulting system is able to accomplish this goal through optimum use of existing and planned resources and institutional facilities. Cost is also reduced and efficiency in operation increased by drawing on existing experience in interfacing guest astronomers with spacecraft as well as mission control experience obtained in the operation of present astronomical spacecraft.

  11. The Identification of Resources and Constraints Influencing Plan Design in Consultation.

    ERIC Educational Resources Information Center

    Bergan, John R.; Neumann, Albert J., II

    1980-01-01

    Interviews of consultants participating in a field experience with teachers showed plan-tactic-elicitors verbalized by consultants had a positive effect on the incidence of resources. Other types of consultant elicitors had a negative impact on resource incidence when compared to the incidence of other types of consultee responses. (Author)

  12. 42 CFR 436.843 - Medically needy resource standard: State plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Medically needy resource standard: State plan... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS ELIGIBILITY IN GUAM, PUERTO RICO, AND THE VIRGIN ISLANDS Financial Requirements for the Medically Needy Medically Needy Resource...

  13. 42 CFR 435.843 - Medically needy resource standard: State plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Medically needy resource standard: State plan... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS ELIGIBILITY IN THE STATES, DISTRICT OF... Financial Requirements for the Medically Needy Medically Needy Resource Standard § 435.843 Medically...

  14. 42 CFR 436.843 - Medically needy resource standard: State plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Medically needy resource standard: State plan... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS ELIGIBILITY IN GUAM, PUERTO RICO, AND THE VIRGIN ISLANDS Financial Requirements for the Medically Needy Medically Needy Resource...

  15. 42 CFR 436.843 - Medically needy resource standard: State plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Medically needy resource standard: State plan... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS ELIGIBILITY IN GUAM, PUERTO RICO, AND THE VIRGIN ISLANDS Financial Requirements for the Medically Needy Medically Needy Resource...

  16. 42 CFR 436.843 - Medically needy resource standard: State plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Medically needy resource standard: State plan... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS ELIGIBILITY IN GUAM, PUERTO RICO, AND THE VIRGIN ISLANDS Financial Requirements for the Medically Needy Medically Needy Resource...

  17. 42 CFR 435.843 - Medically needy resource standard: State plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Medically needy resource standard: State plan... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS ELIGIBILITY IN THE STATES, DISTRICT OF... Financial Requirements for the Medically Needy Medically Needy Resource Standard § 435.843 Medically...

  18. 42 CFR 435.843 - Medically needy resource standard: State plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Medically needy resource standard: State plan... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS ELIGIBILITY IN THE STATES, DISTRICT OF... Financial Requirements for the Medically Needy Medically Needy Resource Standard § 435.843 Medically...

  19. 42 CFR 435.843 - Medically needy resource standard: State plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Medically needy resource standard: State plan... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS ELIGIBILITY IN THE STATES, DISTRICT OF... Financial Requirements for the Medically Needy Medically Needy Resource Standard § 435.843 Medically...

  20. 42 CFR 436.843 - Medically needy resource standard: State plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Medically needy resource standard: State plan... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS ELIGIBILITY IN GUAM, PUERTO RICO, AND THE VIRGIN ISLANDS Financial Requirements for the Medically Needy Medically Needy Resource...

  1. 42 CFR 435.843 - Medically needy resource standard: State plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Medically needy resource standard: State plan... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS ELIGIBILITY IN THE STATES, DISTRICT OF... Financial Requirements for the Medically Needy Medically Needy Resource Standard § 435.843 Medically...

  2. 75 FR 82066 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... with Section 80(a), Public Law 93-251 (88 Stat. 34) and 18 CFR 704.39, which: (1) specify that the rate... Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation... Resources Development Act of 1974 require an annual determination of a discount rate for Federal...

  3. Not planning a sustainable transport system

    SciTech Connect

    Finnveden, Göran Åkerman, Jonas

    2014-04-01

    The overall objective of the Swedish transport policy is to ensure the economically efficient and sustainable provision of transport services for people and business throughout the country. More specifically, the transport sector shall, among other things, contribute to the achievement of environmental quality objectives in which the development of the transport system plays an important role in the achievement of the objectives. The aim of this study is to analyse if current transport planning supports this policy. This is done by analysing two recent cases: the National Infrastructure Plan 2010–2021, and the planning of Bypass Stockholm, a major road investment. Our results show that the plans are in conflict with several of the environmental quality objectives. Another interesting aspect of the planning processes is that the long-term climate goals are not included in the planning processes, neither as a clear goal nor as factor that will influence future transport systems. In this way, the long-term sustainability aspects are not present in the planning. We conclude that the two cases do not contribute to a sustainable transport system. Thus, several changes must be made in the processes, including putting up clear targets for emissions. Also, the methodology for the environmental assessments needs to be further developed and discussed. - Highlights: • Two cases are studied to analyse if current planning supports a sustainable transport system. • Results show that the plans are in conflict with several of the environmental quality objectives. • Long-term climate goals are not included in the planning processes. • Current practices do not contribute to a sustainable planning processes. • Methodology and process for environmental assessments must be further developed and discussed.

  4. Transport aircraft loading and balancing system: Using a CLIPS expert system for military aircraft load planning

    NASA Technical Reports Server (NTRS)

    Richardson, J.; Labbe, M.; Belala, Y.; Leduc, Vincent

    1994-01-01

    The requirement for improving aircraft utilization and responsiveness in airlift operations has been recognized for quite some time by the Canadian Forces. To date, the utilization of scarce airlift resources has been planned mainly through the employment of manpower-intensive manual methods in combination with the expertise of highly qualified personnel. In this paper, we address the problem of facilitating the load planning process for military aircraft cargo planes through the development of a computer-based system. We introduce TALBAS (Transport Aircraft Loading and BAlancing System), a knowledge-based system designed to assist personnel involved in preparing valid load plans for the C130 Hercules aircraft. The main features of this system which are accessible through a convivial graphical user interface, consists of the automatic generation of valid cargo arrangements given a list of items to be transported, the user-definition of load plans and the automatic validation of such load plans.

  5. Lesson Plans on African History and Geography: A Teaching Resource.

    ERIC Educational Resources Information Center

    Hamilton, Robert E., Ed.

    This document presents lesson plans for instruction concerning the history and geography of the continent of Africa. Topics include: (1) "The Challenge of Teaching African History and Culture" (Robert Hamilton); (2) "A Physical Overview of Africa" (Robert Hamilton and Kim Lilly); (3) "A Cultural Overview of Africa" (Robert Hamilton and Kim Lilly);…

  6. Resource Based Learning: An Experience in Planning and Production.

    ERIC Educational Resources Information Center

    McAleese, Ray; Scobbie, John

    A 2-year project at the University of Aberdeen focused on the production of learning materials and the planning of audiovisual based instruction. Background information on the project examines its origins, the nature of course teams, and the evaluation of the five text-tape programs produced. The report specifies three project aims: (1) to produce…

  7. Children at Risk: A Resource and Planning Guide.

    ERIC Educational Resources Information Center

    Van Den Heuvel, Dennis

    This guide was written to provide a practical tool for school, community, family, business, and industry groups to use in planning, developing, and managing service networks to the meet the health, social, and educational needs of children at risk of school failure. This guide contains program models, elements of successful programs, and…

  8. Global Education-An Implementation Plan & Resource Guide.

    ERIC Educational Resources Information Center

    Sny, Chris

    This guide contains a rationale, plan, and bibliography for the implementation of a K-12, district wide, global education program. Parts one and two of the guide provide a definition of and rationale for global education. Global education is defined as the lifelong growth in understanding, through study and participation, of the world community…

  9. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    NASA Technical Reports Server (NTRS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-01-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less man-power rises.Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. The Automated-Scheduling and Planning Environment (ASPEN)tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the ASE project's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  10. State Vocational Education Resource Document: Planning for the Intermediate Future.

    ERIC Educational Resources Information Center

    Broadbent, William

    This report, which presents various economic and demographic data about Hawaii, is intended to assist persons responsible for the short-term planning of vocational-technical education programs in the state. The report is organized in terms of a series of potentially relevant concerns that should be considered during the educational planning…

  11. Natural resource inventory for urban planning utilizing remote sensing techniques

    NASA Technical Reports Server (NTRS)

    Foster, K. E.; Mackey, P. F.; Bonham, C. D.

    1972-01-01

    Remote sensing techniques were applied to the lower Pantano Wash area to acquire data for planning an ecological balance between the expanding Tucson metropolitan area and its environment. The types and distribution of vegetation are discussed along with the hydrologic aspects of the Wash.

  12. 77 FR 14414 - Notice of Intent To Revise Resource Management Plans and an Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ...In compliance with the National Environmental Policy Act of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) Oregon State Office, Portland, Oregon, intends to revise six Resource Management Plans (RMPs) with a single associated Environmental Impact Statement (EIS) for the Western Oregon Planning Area and by this notice is......

  13. Year-Round Education Resource Guidebook: Planning for Effective Facility Utilization and Learning Enhancement.

    ERIC Educational Resources Information Center

    San Diego County Office of Education, CA.

    This resource guidebook provides planning and implementation models for year-round school schedules, including operational and instructional details. Section 1, "Statement of Needs," discusses California's overcrowded facilities, student retention, teacher compensation, and teacher shortage. "Planning Process Model," section 2, recommends methods…

  14. Planning and Budgeting in a Period of Resource Constraint: The New Climate.

    ERIC Educational Resources Information Center

    Arth, Maurice P.

    1984-01-01

    The thesis that the nature of the planning and budgeting processes is affected by the resource environment in which they take place is demonstrated in a case study of Cuyahoga Community College. Increasing planning difficulty in the 1980s resulting from the changing economic environment is forecast. (MSE)

  15. Business Continuity Planning Resources for Small- and Medium-Sized Businesses

    SciTech Connect

    Judd, Kathleen S.; Lesperance, Ann M.

    2010-05-14

    This document/memo summarizes existing resources and guidance on business continuity planning for small- to medium-sized businesses. DTRA will share this information with large commercial businesses who identified the need to help their suppliers and other key collaborators prepare business continuity plans in order to speed recovery from a wide-area bioterrorism incident.

  16. Austin Community College Learning Resource Services Strategic Plan, 1992-1997.

    ERIC Educational Resources Information Center

    Austin Community Coll., TX.

    Designed as a planning tool and a statement of philosophy and mission, this five-part strategic planning report provides information on the activities, goals, and review processes of the Learning Resource Services (LRS) at Austin Community College in Austin, Texas. The LRS combines library services, access to computer terminals, and other…

  17. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... actions, within four management alternatives, designed to address new management challenges and issues... Bureau of Land Management Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land...

  18. 78 FR 39010 - Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... Environmental Impact Statement for the Buffalo Resource Management Plan Revision, Buffalo Field Office, WY... Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the Buffalo Field Office and by this... . Email: BRMP_Rev_WYMail@blm.gov ; Fax: (307) 684-1122; Mail: Buffalo RMP, BLM Buffalo Field Office,...

  19. 76 FR 72718 - Notice of Availability of the Draft Baker Resource Management Plan and Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... should the diverse landscapes and resources within the Planning Area be managed? Issue 2: Renewable Energy Development--How should the BLM Baker Field Office manage renewable energy development? Issue 3... planning criteria for review and was published in the Federal Register on January 15, 2008 (73 FR...

  20. 43 CFR 1610.5 - Resource management plan approval, use and modification.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management plan approval, use and modification. 1610.5 Section 1610.5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING,...

  1. 43 CFR 1610.5 - Resource management plan approval, use and modification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management plan approval, use and modification. 1610.5 Section 1610.5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING,...

  2. 43 CFR 1610.5 - Resource management plan approval, use and modification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management plan approval, use and modification. 1610.5 Section 1610.5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING,...

  3. A System For Temporal Plan Generation

    NASA Astrophysics Data System (ADS)

    Tirumala, Bharadwaj S.; Hall, Lawrence O.

    1989-03-01

    Temporal reasoning, which is a way of pursuing goals and drawing inferences based on events occurring over time, plays an important role in automated planning systems and in general in common sense reasoning. This work is an attempt at exploring the problems involved in reasoning over time which typically involve updating a plan structure with changing world patterns. This involves developing the appropriate knowledge representation in addition to a plan generation system. A deductive retrieval mechanism, which has been tailored to the needs of temporal retrievals, has been imple-mented. Uncertainty due to incomplete information and indecision is resolved using fuzzy values and a dynamic resolution over a temporal data base. Imprecise temporal information is captured in fuzzy intervals. These intervals are made up of a beginning hour and ending hour. The system can find the tightest possible bounds on a possible event or step in a plan. The system user provides the constraint information for plan development. This is combined with basic domain information in the knowledge base. A plan or set of steps through some temporal constraints will be presented based upon the constraints and domain information. A fuzzy belief in the chance of the plans' success is associated with the information provided by the system.

  4. Development of Alabama Resources Information System (ARIS)

    NASA Technical Reports Server (NTRS)

    Herring, B. E.; Vachon, R. I.

    1976-01-01

    A formal, organized set of information concerning the development status of the Alabama Resources Information System (ARIS) as of September 1976 is provided. A series of computer source language programs, and flow charts related to each of the computer programs to provide greater ease in performing future change are presented. Listings of the variable names, and their meanings, used in the various source code programs, and copies of the various user manuals which were prepared through this time are given.

  5. A review of mission planning systems

    NASA Technical Reports Server (NTRS)

    Jones, M.; Sorensen, E. M.; Wolff, T.; Haddow, C. R.

    1993-01-01

    A general definition of Mission Planning is given. The definition covers the full scope of an end-to-end mission planning system. Noting the mission-specific nature of most mission planning systems, a classification of autonomous spacecraft missions is made into Observatory, Survey, multi-instrument science, and Telecommunications missions. The mission planning approach for one mission in each category is examined critically. The following missions were chosen: ISO (Infrared Space Observatory); ERS-1 (European Remote Sensing Satellite); and Eureca (European Retrievable Carrier). The paper gives a summary of lessons learned from these missions suggesting improvements in areas such as requirements analysis, testing, user interfacing, rules, and constraints handling. The paper will also examine commonalities in functions, which could constitute a basis for identification of generic mission planning support tools.

  6. Planning for Life: Developing and Recognizing Exemplary Career Planning Programs. A Resource Guide for Counselors.

    ERIC Educational Resources Information Center

    Dahir, Carol, Ed.

    Recognizing the importance of the need for effective career planning, the United States Army, in conjunction with the Council of Economic Development, conducted a forum to focus on this issue. What emerged was a program called Planning for Life, which annually recognizes outstanding career planning programs at the state and national level. The…

  7. Environmental Resources Analysis System, A Prototype DSS

    USGS Publications Warehouse

    Flug, M.; Campbell, S.G.

    2003-01-01

    Since the 1960's, an increase in the public's environmental ethics, federal species preservation, water quality protection, and interest in free flowing rivers have evolved to the current concern for stewardship and conservation of natural resources. This heightened environmental awareness creates an appetite for data, models, information management, and systematic analysis of multiple scientific disciplines. A good example of this information and analysis need resides in the Green and Yampa Rivers, tributary to the Upper Colorado River. These rivers are home to endangered native fish species including the pikeminnow and razorback sucker. Two dams, Fontenelle and Flaming Gorge, impound the Green River headwaters. The respective reservoirs store water supplies as well as generate hydropower. Conversely, the Yampa River is considered unregulated and encompasses most of Dinosaur National Monument. Recreation is highly regarded on both rivers including fishing, whitewater rafting, and aesthetic values. Vast areas of irrigated agriculture, forestry, and mineral extraction also surround these rivers. To address this information need, we developed a prototype Environmental Resources Analysis System (ERAS) spreadsheet-based decision support system (DSS). ERAS provides access to historic data sets, scientific information, statistical analysis, model outputs, and comparative methods all in a familiar and user-friendly format. This research project demonstrates a simplified decision support system for use by a diverse mix of resource managers, special interest groups, and individuals concerned about the sustainability of the Green and Yampa River ecosystem.

  8. Business Planning for Cultural Heritage Institutions. A Framework and Resource Guide to Assist Cultural Heritage Institutions with Business Planning for Sustainability of Digital Asset Management Programs

    ERIC Educational Resources Information Center

    Bishoff, Liz; Allen, Nancy

    2004-01-01

    The purpose of this document is to present a framework and resource guide to help cultural heritage institutions plan sustainable access to their digital cultural assets and to do so by means that link their missions to planning modes and models. To aid cultural heritage organizations in the business-planning process, this resource will do the…

  9. Scoping study of integrated resource planning needs in the public utility sector

    SciTech Connect

    Garrick, C J; Garrick, J M; Rue, D R

    1993-06-01

    Integrated resource planning (IRP) is an approach to utility resource planning that integrates the evaluation of supply- and demand-site options for providing energy services at the least cost. Many utilities practice IRP; however, most studies about IRP focus on investor-owned utilities (IOUs). This scoping study investigates the IRP activities and needs of public utilities (not-for-profit utilities, including federal, state, municipal, and cooperative utilities). This study (1) profiles IRP-related characteristics of the public utility sector, (2) articulates the needs of public utilities in understanding and implementing IRP, and (3) identifies strategies to advance IRP principles in public utility planning.

  10. Integrated Water Resources Planning and Management in Arid/Semi-arid Regions: Data, Modeling, and Assessment

    NASA Astrophysics Data System (ADS)

    Gupta, H.; Liu, Y.; Wagener, T.; Durcik, M.; Duffy, C.; Springer, E.

    2005-12-01

    Water resources in arid and semi-arid regions are highly sensitive to climate variability and change. As the demand for water continues to increase due to economic and population growth, planning and management of available water resources under climate uncertainties becomes increasingly critical in order to achieve basin-scale water sustainability (i.e., to ensure a long-term balance between supply and demand of water).The tremendous complexity of the interactions between the natural hydrologic system and the human environment means that modeling is the only available mechanism for properly integrating new knowledge into the decision-making process. Basin-scale integrated models have the potential to allow us to study the feedback processes between the physical and human systems (including institutional, engineering, and behavioral components); and an integrated assessment of the potential second- and higher-order effects of political and management decisions can aid in the selection of a rational water-resources policy. Data and information, especially hydrological and water-use data, are critical to the integrated modeling and assessment for water resources management of any region. To this end we are in the process of developing a multi-resolution integrated modeling and assessment framework for the south-western USA, which can be used to generate simulations of the probable effects of human actions while taking into account the uncertainties brought about by future climatic variability and change. Data are being collected (including the development of a hydro-geospatial database) and used in support of the modeling and assessment activities. This paper will present a blueprint of the modeling framework, describe achievements so far and discuss the science questions which still require answers with a particular emphasis on issues related to dry regions.

  11. Building system integration research: recommendations for a US Department of Energy multiyear program plan

    SciTech Connect

    Not Available

    1986-01-01

    This plan describes the scope, technical content, and resources required to conduct the Building System Integration (BSI) research program during FY 1987 through 1991. System integration research is defined, the need for the research is discussed, its benefits are outlined, and the history of building system integration research is summarized. The program scope, the general approach taken in developing this program plan, and the plan's contents are also described.

  12. Operating Water Resources Systems Under Climate Change Scenarios

    NASA Astrophysics Data System (ADS)

    Ahmad, S.

    2002-12-01

    Population and industrial growth has resulted in intense demands on the quantity and quality of water resources worldwide. Moreover, climate change/variability is making a growing percentage of the earth's population vulnerable to extreme weather events (drought and flood). The 1996 Saguenay flood, 1997 Red River flood, the 1998 ice storm, and recent droughts in prairies are few examples of extreme weather events in Canada. Rising economic prosperity, growth in urban population, aging infrastructure, and a changing climate are increasing the vulnerability of Canadians to even more serious impacts. This growing threat can seriously undermine the social and economic viability of the country. Our ability to understand the impacts of climate change/variability on water quantity, quality, and its distribution in time and space can prepare us for sustainable management of this precious resource. The sustainability of water resources, over the medium to long-term, is critically dependent on the ability to manage (plan and operate) water resource systems under a more variable and perhaps warmer future climate. Studying the impacts of climate change/variability on water resources is complex and challenging. It is further complicated by the fact that impacts vary with time and are different at different locations. This study deals with the impacts of climate change/variability on water resources in a portion of the Red River Basin in Canada, both in terms of change in quantity and spatial-temporal distribution. A System Dynamics model is developed to describe the operation of the Shellmouth Reservoir located on the Red River in Canada. The climate data from Canadian Global Coupled Model, CGCM1 is used. The spatial system dynamics approach, based on distributed parameter control theory, is used to model the impacts of climate change/variability on water resources in time and space. A decision support system is developed to help reservoir operators and decision makers in

  13. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  14. Strategic planning for an information system.

    PubMed

    Clement, H; Salois-Swallow, D

    1995-01-01

    1. BACKGROUND. This strategic plan was developed by members of the Ontario Nursing Informatics Group (ONIG), an affiliated group of the Registered Nurses Association of Ontario (RNAO), in response to priorities set by its membership. This project management approach is an overview of the step-by-step approach described in the workbook Framework for Planning Nursing Information Systems [1]. 2. PLANNING PROCESS. The first phase, "Getting Ready," of the planning process emphasizes the importance of developing a strategic vision and preparing a business case. The objectives to be attained include a review of the current healthcare trends and state-of-the-art, the development of commitment from managers, and the establishment of a project structure. Secondly, one must "Analyze the Needs" of the health care facility. The current system is reviewed and future information requirements are defined. To facilitate this analysis, a detailed review of the current system is undertaken, the current system costs are identified, the technical and functional requirements are determined, and anticipated costs and benefits are outlined. Phase three, "Choosing a System," involves selecting system(s) that best meet the needs of the healthcare facility. A detailed system review is undertaken; it includes planning for the selection process, developing a request for information and/or a request for proposal, attending vendor demonstrations, attending site visits, and negotiating the contract. "Implementing the System" outlines the project plan for integrating the selected system in the work environment. The activities involved in managing the change process include the identification of the project team, defining the project plan, reviewing the budget, tailoring the system to meet the health care facility requirements, developing policies and procedures, outlining educational requirements, installing new hardware and software, piloting the system, and managing the transition. During the

  15. Planning for an Irrigation System.

    ERIC Educational Resources Information Center

    Turner, J. Howard; Anderson, Carl L.

    The publication, with the aid of tables and colored illustrations and diagrams, presents information to help the farmer who is considering the installation of an irrigation system determine whether or not to irrigate, the type of system to use, and the irrigation cost and return on investment. Information is presented on the increase in yield to…

  16. Integrated Systems for Education Information: A Business Plan for Managing North Carolina's Public School System. Management Summary Report.

    ERIC Educational Resources Information Center

    1984

    This report describes the North Carolina Department of Education's 5-year plan for establishing a statewide management information system. The system is intended to improve fiscal management, personnel administration, and administrative operations, and to ensure efficient resource use. Initial sections present highlights of the plan; background…

  17. US Department of Energy Integrated Resource Planning Program: Accomplishments and opportunities

    SciTech Connect

    White, D.L.; Mihlmester, P.E.

    1993-12-17

    The US Department of Energy Integrated Resource Planning Program supports many activities and projects that enhance the process by which utilities assess demand and supply options and, subsequently, evaluate and select resources. The US Department of Energy program coordinates integrated resource planning in risk and regulatory analysis; utility and regional planning; evaluation and verification; information transfer/technological assistance; and demand-side management. Professional staff from the National Renewable Energy Laboratory, Oak Ridge National Laboratory, Lawrence Berkeley Laboratory, and Pacific Northwest Laboratories collaborate with peers and stakeholders, in particular, the National Association of Regulatory Utility Commissioners, and conduct research and activities for the US Department of Energy. Twelve integrated resource planning activities and projects are summarized in this report. The summaries reflect the diversity of planning and research activities supported by the Department. The summaries also reflect the high levels of collaboration and teaming that are required by the Program and practiced by the researchers. It is concluded that the Program is achieving its objectives by encouraging innovation and improving planning and decision making. Furthermore, as the Department continues to implement planned improvements in the Program, the Department is effectively positioned to attain its ambitious goals.

  18. Case study of open-source enterprise resource planning implementation in a small business

    NASA Astrophysics Data System (ADS)

    Olson, David L.; Staley, Jesse

    2012-02-01

    Enterprise resource planning (ERP) systems have been recognised as offering great benefit to some organisations, although they are expensive and problematic to implement. The cost and risk make well-developed proprietorial systems unaffordable to small businesses. Open-source software (OSS) has become a viable means of producing ERP system products. The question this paper addresses is the feasibility of OSS ERP systems for small businesses. A case is reported involving two efforts to implement freely distributed ERP software products in a small US make-to-order engineering firm. The case emphasises the potential of freely distributed ERP systems, as well as some of the hurdles involved in their implementation. The paper briefly reviews highlights of OSS ERP systems, with the primary focus on reporting the case experiences for efforts to implement ERPLite software and xTuple software. While both systems worked from a technical perspective, both failed due to economic factors. While these economic conditions led to imperfect results, the case demonstrates the feasibility of OSS ERP for small businesses. Both experiences are evaluated in terms of risk dimension.

  19. Strategic workforce planning for a multihospital, integrated delivery system.

    PubMed

    Datz, David; Hallberg, Colleen; Harris, Kathy; Harrison, Lisa; Samples, Patience

    2012-01-01

    Banner Health has long recognized the need to anticipate, beyond the immediate operational realities or even the annual budgeting projection exercises, the necessary workforce needs of the future. Thus, in 2011, Banner implemented a workforce planning model that included structures, processes, and tools for predicting workforce needs, with particular focus on identified critical systemwide practice areas. The model represents the incorporation of labor management tools and processes with more strategic, broad-view, long-term assessment and planning mechanisms. The sequential tying of the workforce planning lifecycle with the organization's strategy and financial planning process supports alignment of goals, objectives, and resource allocation. Collaboration among strategy, finance, human resources, and operations has provided us with the ability to identify critical position groups based on 3-year strategic priorities. By engaging leaders from across the organization, focusing on activities at facility, regional, and system levels, and building in mechanisms for accountability, we are now engaged in continuous evaluations of our delivery models, the competencies and preparations necessary for the staff to effectively function within those delivery models, and developing and implementing action plans designed to ensure adequate numbers of the staff whose competencies will be suited to the work expected of them. PMID:22955225

  20. Work management plan for data systems and analysis directorate

    NASA Technical Reports Server (NTRS)

    Nichols, L. R.

    1979-01-01

    A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.

  1. Satellite services system program plan

    NASA Technical Reports Server (NTRS)

    Hoffman, Stephen J.

    1985-01-01

    The purpose is to determine the potential for servicing from the Space Shuttle Orbiter and to assess NASA's role as the catalyst in bringing about routine on-orbit servicing. Specifically this study seeks to determine what requirements, in terms of both funds and time, are needed to make the Shuttle Orbiter not only a transporter of spacecraft but a servicing vehicle for those spacecraft as well. The scope of this effort is to focus on the near term development of a generic servicing capability. To make this capability truly generic and attractive requires that the customer's point of veiw be taken and transformed into a widely usable set of hardware. And to maintain a near term advent of this capability requires that a minimal reliance be made on advanced technology. With this background and scope, this study will proceed through three general phases to arrive at the desired program costs and schedule. The first step will be to determine the servicing requirements of the user community. This will provide the basis for the second phase which is to develop hardware concepts to meet these needs. Finally, a cost estimate will be made for each of the new hardware concepts and a phased hardware development plan will be established for the acquisition of these items based on the inputs obtained from the user community.

  2. Space Resource Utilization: Near-Term Missions and Long-Term Plans for Human Exploration

    NASA Technical Reports Server (NTRS)

    Sanders, Gerald B.

    2015-01-01

    A primary goal of all major space faring nations is to explore space: from the Earth with telescopes, with robotic probes and space telescopes, and with humans. For the US National Aeronautics and Space Administration (NASA), this pursuit is captured in three important strategic goals: 1. Ascertain the content, origin, and evolution of the solar system and the potential for life elsewhere, 2. Extend and sustain human activities across the solar system (especially the surface of Mars), and 3. Create innovative new space technologies for exploration, science, and economic future. While specific missions and destinations are still being discussed as to what comes first, it is imperative for NASA that it foster the development and implementation of new technologies and approaches that make space exploration affordable and sustainable. Critical to achieving affordable and sustainable human exploration beyond low Earth orbit (LEO) is the development of technologies and systems to identify, extract, and use resources in space instead of bringing everything from Earth. To reduce the development and implementation costs for space resource utilization, often called In Situ Resource Utilization (ISRU), it is imperative to work with terrestrial mining companies to spin-in/spin-off technologies and capabilities, and space mining companies to expand our economy beyond Earth orbit. In the last two years, NASA has focused on developing and implementing a sustainable human space exploration program with the ultimate goal of exploring the surface of Mars with humans. The plan involves developing technology and capability building blocks critical for sustained exploration starting with the Space Launch System (SLS) and Orion crew spacecraft and utilizing the International Space Station as a springboard into the solar system. The evolvable plan develops and expands human exploration in phases starting with missions that are reliant on Earth, to performing ever more challenging and

  3. Smart Operations in Distributed Energy Resources System

    NASA Astrophysics Data System (ADS)

    Wei, Li; Jie, Shu; Zhang-XianYong; Qing, Zhou

    Smart grid capabilities are being proposed to help solve the challenges concerning system operations due to that the trade-offs between energy and environmental needs will be constantly negotiated while a reliable supply of electricity needs even greater assurance in case of that threats of disruption have risen. This paper mainly explores models for distributed energy resources system (DG, storage, and load),and also reviews the evolving nature of electricity markets to deal with this complexity and a change of emphasis on signals from these markets to affect power system control. Smart grid capabilities will also impact reliable operations, while cyber security issues must be solved as a culture change that influences all system design, implementation, and maintenance. Lastly, the paper explores significant questions for further research and the need for a simulation environment that supports such investigation and informs deployments to mitigate operational issues as they arise.

  4. Resource Letter CS-1: Complex Systems

    NASA Astrophysics Data System (ADS)

    Newman, M. E. J.

    2011-08-01

    A complex system is a system composed of many interacting parts, often called agents, which displays collective behavior that does not follow trivially from the behaviors of the individual parts. Examples include condensed-matter systems, ecosystems, stock markets and economies, biological evolution, and indeed the whole of human society. Substantial progress has been made in the quantitative understanding of complex systems, particularly since the 1980s, using a combination of basic theory, much of it derived from physics, and computer simulation. The subject is a broad one, drawing on techniques and ideas from a wide range of areas. Here, I give a selection of introductory resources, ranging from classic papers to recent books and reviews.

  5. The importance of team functioning to natural resource planning outcomes.

    PubMed

    Stern, Marc J; Predmore, S Andrew

    2012-09-15

    In its recent history, the U.S. Forest Service is among many federal land management agencies struggling with questions concerning why its planning procedures are sometimes inefficient, perform poorly in the eyes of the public, and fail to deliver outputs that advance agency mission. By examining a representative sample of National Environmental Policy Act (NEPA) processes conducted by the agency between 2007 and 2009, we provide new insights into what drives outcomes in these planning processes. We examined team leaders' perceptions of the following outcomes: achievement of agency goals and NEPA mandates, process efficiency, public relations, and team outcomes. The most consistently important predictors of positive outcomes were team harmony and a clearly empowered team leader. Other factors, such as perceptions of the use of best science, a clear and unambiguous purpose and need, team turnover (personnel changes during the process), extra-agency engagement, and intra-agency relations, were also important, but played a less consistent role. The findings suggest the importance of empowering team leaders and team members through enhancing elements of discretion, responsibility, clear role definition, collaborative interdisciplinary deliberation, and perceived self-efficacy. The results also suggest the importance of genuine concern and respect for participating publics and effective inter-agency coordination. PMID:22562009

  6. Information resources management long-range plan, FY1994--1998

    SciTech Connect

    Not Available

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements.

  7. Tank waste remediation system configuration management plan

    SciTech Connect

    Vann, J.M.

    1998-01-08

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

  8. Tank waste remediation system multi-year work plan

    SciTech Connect

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  9. 44 CFR 208.6 - System resource reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false System resource reports. 208... § 208.6 System resource reports. (a) Reports to Assistant Administrator. The Assistant Administrator may request reports from any System resource relating to its activities as part of the System. (b) Reports...

  10. 44 CFR 208.6 - System resource reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false System resource reports. 208... § 208.6 System resource reports. (a) Reports to Assistant Administrator. The Assistant Administrator may request reports from any System resource relating to its activities as part of the System. (b) Reports...

  11. 44 CFR 208.6 - System resource reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true System resource reports. 208.6... System resource reports. (a) Reports to Assistant Administrator. The Assistant Administrator may request reports from any System resource relating to its activities as part of the System. (b) Reports to...

  12. 44 CFR 208.6 - System resource reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false System resource reports. 208... § 208.6 System resource reports. (a) Reports to Assistant Administrator. The Assistant Administrator may request reports from any System resource relating to its activities as part of the System. (b) Reports...

  13. 44 CFR 208.6 - System resource reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false System resource reports. 208... § 208.6 System resource reports. (a) Reports to Assistant Administrator. The Assistant Administrator may request reports from any System resource relating to its activities as part of the System. (b) Reports...

  14. A resource-efficient planning for pressure ulcer prevention.

    PubMed

    Ostadabbas, Sarah; Yousefi, Rasoul; Nourani, Mehrdad; Faezipour, Miad; Tamil, Lakshman; Pompeo, Matthew Q

    2012-11-01

    Pressure ulcer is a critical problem for bed-ridden and wheelchair-bound patients, diabetics, and the elderly. Patients need to be regularly repositioned to prevent excessive pressure on a single area of body, which can lead to ulcers. Pressure ulcers are extremely costly to treat and may lead to several other health problems, including death. The current standard for prevention is to reposition at-risk patients every two hours. Even if it is done properly, a fixed schedule is not sufficient to prevent all ulcers. Moreover, it may result in nurses being overworked by turning some patients too frequently. In this paper, we present an algorithm for finding a nurse-effort optimal repositioning schedule that prevents pressure ulcer formation for a finite planning horizon. Our proposed algorithm uses data from a commercial pressure mat assembled on the beds surface and provides a sequence of next positions and the time of repositioning for each patient. PMID:22922729

  15. Information systems on human resources for health: a global review

    PubMed Central

    2012-01-01

    Background Although attainment of the health-related Millennium Development Goals relies on countries having adequate numbers of human resources for health (HRH) and their appropriate distribution, global understanding of the systems used to generate information for monitoring HRH stock and flows, known as human resources information systems (HRIS), is minimal. While HRIS are increasingly recognized as integral to health system performance assessment, baseline information regarding their scope and capability around the world has been limited. We conducted a review of the available literature on HRIS implementation processes in order to draw this baseline. Methods Our systematic search initially retrieved 11 923 articles in four languages published in peer-reviewed and grey literature. Following the selection of those articles which detailed HRIS implementation processes, reviews of their contents were conducted using two-person teams, each assigned to a national system. A data abstraction tool was developed and used to facilitate objective assessment. Results Ninety-five articles with relevant HRIS information were reviewed, mostly from the grey literature, which comprised 84 % of all documents. The articles represented 63 national HRIS and two regionally integrated systems. Whereas a high percentage of countries reported the capability to generate workforce supply and deployment data, few systems were documented as being used for HRH planning and decision-making. Of the systems examined, only 23 % explicitly stated they collect data on workforce attrition. The majority of countries experiencing crisis levels of HRH shortages (56 %) did not report data on health worker qualifications or professional credentialing as part of their HRIS. Conclusion Although HRIS are critical for evidence-based human resource policy and practice, there is a dearth of information about these systems, including their current capabilities. The absence of standardized HRIS profiles

  16. High-Level Waste Systems Plan. Revision 7

    SciTech Connect

    Brooke, J.N.; Gregory, M.V.; Paul, P.; Taylor, G.; Wise, F.E.; Davis, N.R.; Wells, M.N.

    1996-10-01

    This revision of the High-Level Waste (HLW) System Plan aligns SRS HLW program planning with the DOE Savannah River (DOE-SR) Ten Year Plan (QC-96-0005, Draft 8/6), which was issued in July 1996. The objective of the Ten Year Plan is to complete cleanup at most nuclear sites within the next ten years. The two key principles of the Ten Year Plan are to accelerate the reduction of the most urgent risks to human health and the environment and to reduce mortgage costs. Accordingly, this System Plan describes the HLW program that will remove HLW from all 24 old-style tanks, and close 20 of those tanks, by 2006 with vitrification of all HLW by 2018. To achieve these goals, the DWPF canister production rate is projected to climb to 300 canisters per year starting in FY06, and remain at that rate through the end of the program in FY18, (Compare that to past System Plans, in which DWPF production peaked at 200 canisters per year, and the program did not complete until 2026.) An additional $247M (FY98 dollars) must be made available as requested over the ten year planning period, including a one-time $10M to enhance Late Wash attainment. If appropriate resources are made available, facility attainment issues are resolved and regulatory support is sufficient, then completion of the HLW program in 2018 would achieve a $3.3 billion cost savings to DOE, versus the cost of completing the program in 2026. Facility status information is current as of October 31, 1996.

  17. A Strategic Planning Guide for State-Level Early Childhood Systems-Building Initiatives: From Resources to Results for Young Children and Their Families. Building State Early Childhood Comprehensive Systems Series. Number 6

    ERIC Educational Resources Information Center

    Tullis, Ericka; Sutherland, Carol; Uyeda, Kimberly; Halfon, Neal

    2004-01-01

    The State Early Childhood Comprehensive Systems (SECCS) Initiative represents a unique opportunity to improve the quality of life for young children and their families, and support them in reaching their full potential. Under the SECCS Initiative, state mother and child health agencies are being asked to apply MCH experience and expertise to a…

  18. Natural resources inventory system ASVT project

    NASA Technical Reports Server (NTRS)

    Joyce, A. T. (Principal Investigator)

    1978-01-01

    The author has identified the following significant results. One of the main advantages, both cost-wise and time-wise, of the natural resource inventory system involved the use of LANDSAT-acquired digital data for the land cover information component; thereby, eliminating the need to digitize such dynamic information from a map or aerial photo base. It was thought that the utility and the cost of information as derived from LANDSAT data for the various applications justified the operational use of data generated by LANDSAT.

  19. 20 CFR 416.1227 - When the resources excluded under a plan to achieve self-support begin to count.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false When the resources excluded under a plan to achieve self-support begin to count. 416.1227 Section 416.1227 Employees' Benefits SOCIAL SECURITY... When the resources excluded under a plan to achieve self-support begin to count. The resources...

  20. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  1. GPLAN: A Generalized Data Base Planning System.

    ERIC Educational Resources Information Center

    Nunamaker, J. F., Jr.; And Others

    It is recognized that there is a major gap between the promises of large data bases and optimization and simulation models and their actual ability to solve real world problems. This document describes a Generalized Data Base Planning System (GPLAN), currently being developed at Purdue University, that is proposed as a system to bridge this gap. A…

  2. Some guidance on preparing validation plans for the DART Full System Models.

    SciTech Connect

    Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy

    2009-03-01

    Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generally applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.

  3. Resource analysis and land use planning with space and high altitude photography

    NASA Technical Reports Server (NTRS)

    Schrumpf, B. J.

    1972-01-01

    Photographic scales providing resource data for decision making processes of land use and a legend system for barren lands, water resources, natural vegetation, agricultural, urban, and industrial lands in hierarchical framework are applied to various remote sensing techniques. Two natural vegetation resource and land use maps for a major portion of Maricopa County, Arizona are also produced.

  4. Total Water Management: The New Paradigm for Urban Water Resources Planning

    EPA Science Inventory

    There is a growing need for urban water managers to take a more holistic view of their water resource systems as population growth, urbanization, and current resource management practices put different stresses on local water resources and urban infrastructure. Total Water Manag...

  5. Addressing water resources risk in England and Wales: Long term infrastructure planning in a private, regulated industry

    NASA Astrophysics Data System (ADS)

    Turner, Sean

    2015-04-01

    Water resources planning is a complex and challenging discipline in which decision makers must deal with conflicting objectives, contested socio-economic values and vast uncertainties, including long term hydrological variability. The task is arguably more demanding in England and Wales, where private water companies must adhere to a rigid set of regulatory planning guidelines in order to justify new infrastructural investments. These guidelines prescribe a "capacity expansion" approach to planning: ensure that a deterministic measure of supply, known as "Deployable Output," meets projected demand over a 25-year planning horizon. Deployable Output is derived using a method akin to yield analysis and is commensurate with the maximum rate of supply that a water resources system can sustain without incurring failure under a simulation of historical recorded hydrological conditions. This study examines whether Deployable Output analysis is fit to serve an industry in which: water companies are seeking to invest in cross-company water transfer schemes to deal with loss of water availability brought about by European environmental legislation and an increase in demand driven by population growth; water companies are expected address potential climate change impacts through their planning activities; and regulators wish to benchmark water resource system performance across the separate companies. Of particular interest, then, is the adequacy of Deployable Output analysis as a means to measuring current and future water shortage risk and comparing across supply systems. Data from the UK National River Flow Archive are used to develop a series of hypothetical reservoir systems in two hydrologically contrasting regions -- northwest England/north Wales and Southeast England. The systems are varied by adjusting the draft ratio (ratio of target annual demand to mean annual inflow), the inflow diversity (covariance of streamflow sequences supplying the system), the strength of

  6. Guidelines for Planning in Colleges and Universities. Volume One, Planning System.

    ERIC Educational Resources Information Center

    Pinnell, Charles; Wacholder, Michael

    This volume outlines a system for effective planning in higher education. The system integrates management and program planning, physical plant planning, and financial planning into a single process designed to support institutional management and decision making at all administrative levels. Because successful planning is a process, procedures…

  7. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study

    SciTech Connect

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie

    2013-11-15

    Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (∼2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ∼2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the

  8. Tank waste remediation system engineering plan

    SciTech Connect

    Rifaey, S.H.

    1998-01-09

    This Engineering Plan describes the engineering process and controls that will be in place to support the Technical Baseline definition and manage its evolution and implementation to the field operations. This plan provides the vision for the engineering required to support the retrieval and disposal mission through Phase 1 and 2, which includes integrated data management of the Technical Baseline. Further, this plan describes the approach for moving from the ``as is`` condition of engineering practice, systems, and facilities to the desired ``to be`` configuration. To make this transition, Tank Waste Remediation System (TWRS) Engineering will become a center of excellence for TWRS which,will perform engineering in the most effective manner to meet the mission. TWRS engineering will process deviations from sitewide systems if necessary to meet the mission most effectively.

  9. Integrating Green and Blue Water Management Tools for Land and Water Resources Planning

    NASA Astrophysics Data System (ADS)

    Jewitt, G. P. W.

    2009-04-01

    The role of land use and land use change on the hydrological cycle is well known. However, the impacts of large scale land use change are poorly considered in water resources planning, unless they require direct abstraction of water resources and associated development of infrastructure e.g. Irrigation Schemes. However, large scale deforestation for the supply of raw materials, expansion of the areas of plantation forestry, increasing areas under food production and major plans for cultivation of biofuels in many developing countries are likely to result in extensive land use change. Given the spatial extent and temporal longevity of these proposed developments, major impacts on water resources are inevitable. It is imperative that managers and planners consider the consequences for downstream ecosystems and users in such developments. However, many popular tools, such as the vitual water approach, provide only coarse scale "order of magnitude" type estimates with poor consideration of, and limited usefulness, for land use planning. In this paper, a framework for the consideration of the impacts of large scale land use change on water resources at a range of temporal and spatial scales is presented. Drawing on experiences from South Africa, where the establishment of exotic commercial forest plantations is only permitted once a water use license has been granted, the framework adopts the "green water concept" for the identification of potential high impact areas of land use change and provides for integration with traditional "blue water" water resources planning tools for more detailed planning. Appropriate tools, ranging from simple spreadsheet solutions to more sophisticated remote sensing and hydrological models are described, and the application of the framework for consideration of water resources impacts associated with the establishment of large scale tectona grandis, sugar cane and jatropha curcas plantations is illustrated through examples in Mozambique

  10. Planning Under Continuous Time and Resource Uncertainty: A Challenge for AI

    NASA Technical Reports Server (NTRS)

    Bresina, John; Dearden, Richard; Meuleau, Nicolas; Smith, David; Washington, Rich; Clancy, Daniel (Technical Monitor)

    2002-01-01

    There has been considerable work in Al on decision-theoretic planning and planning under uncertainty. Unfortunately, all of this work suffers from one or more of the following limitations: 1) it relies on very simple models of actions and time, 2) it assumes that uncertainty is manifested in discrete action outcomes, and 3) it is only practical for very small problems. For many real world problems, these assumptions fail to hold. A case in point is planning the activities for a Mars rover. For this domain none of the above assumptions are valid: 1) actions can be concurrent and have differing durations, 2) there is uncertainty concerning action durations and consumption of continuous resources like power, and 3) typical daily plans involve on the order of a hundred actions. We describe the rover problem, discuss previous work on planning under uncertainty, and present a detailed. but very small, example illustrating some of the difficulties of finding good plans.

  11. Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans

    SciTech Connect

    Bolinger, Mark; Wiser, Ryan

    2005-08-10

    Markets for renewable energy have historically been motivated primarily by policy efforts, but a less widely recognized driver is poised to also play a major role in the coming years: utility integrated resource planning (IRP). Resource planning has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, the most recent resource plans contemplate a significant amount of renewable energy additions. These planned additions--primarily coming from wind power--are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. This report examines how twelve western utilities treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. Our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to identify methodological/modeling issues, and suggest possible improvements to methods used to evaluate renewable energy as a resource option. Here we summarize the key findings of the report, beginning with a discussion of the planned renewable energy additions called for by the twelve utilities, an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.

  12. 77 FR 43592 - System Energy Resources, Inc.; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-25

    ..., 2012, System Energy Resources, Inc. (System Energy Resources), submitted a supplement to its petition... supplement, System Energy Resources supplements its March 28 petition to provide additional information and... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY...

  13. A dynamic case-based planning system for space station application

    NASA Technical Reports Server (NTRS)

    Oppacher, F.; Deugo, D.

    1988-01-01

    We are currently investigating the use of a case-based reasoning approach to develop a dynamic planning system. The dynamic planning system (DPS) is designed to perform resource management, i.e., to efficiently schedule tasks both with and without failed components. This approach deviates from related work on scheduling and on planning in AI in several aspects. In particular, an attempt is made to equip the planner with an ability to cope with a changing environment by dynamic replanning, to handle resource constraints and feedback, and to achieve some robustness and autonomy through plan learning by dynamic memory techniques. We briefly describe the proposed architecture of DPS and its four major components: the PLANNER, the plan EXECUTOR, the dynamic REPLANNER, and the plan EVALUATOR. The planner, which is implemented in Smalltalk, is being evaluated for use in connection with the Space Station Mobile Service System (MSS).

  14. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  15. [Diagnostic studies in the planning process of human resources: the Central American experience].

    PubMed

    de Canales, F; Martínez Chopen, O; Tercero Talavera, I; González, G

    1987-01-01

    In this paper the authors analyze various aspects of one of the essential stages in the process of planning human resources--diagnostic studies and research which will serve as a starting point. They stress the role of diagnostic personnel studies in formulating human resources policies and planning, and describe the phases to be followed in their execution, according to the results obtained in the three Central American countries (Guatemala, Honduras, and Nicaragua) in which the studies were completed. The paper concludes with a summary of the process in the three countries. PMID:3451871

  16. Water resources appraisals for hydroelectric licensing: Cumberland River Basin, Kentucky and Tennessee. Planning status report

    SciTech Connect

    Not Available

    1981-02-01

    The water resources of the Cumberland River Basin which covers 17,914 sq. miles in southern Kentucky and north central Tennessee are evaluated. Data are presented on existing and potential water resource development, on water use by existing and projected steam-electric generating facilities, and the status of hydroplant licensing. Past and current planning studies are summarized. The information is current as of December 1980. (LCL)

  17. 78 FR 65416 - Supplemental Environmental Impact Statement-Integrated Resource Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ...The Tennessee Valley Authority (TVA) is conducting a study of its energy resources in order to update and replace the integrated Resource Plan (IRP) and the associated Environmental Impact Statement (EIS) that it completed in 2011. The IRP is a comprehensive study of how TVA will meet the demand for electricity in its service territory over the next 20 years. The 2011 IRP is being updated in......

  18. System-Level Planning, Coordination, and Communication

    PubMed Central

    Kanter, Robert K.; Dries, David; Luyckx, Valerie; Lim, Matthew L.; Wilgis, John; Anderson, Michael R.; Sarani, Babak; Hupert, Nathaniel; Mutter, Ryan; Devereaux, Asha V.; Christian, Michael D.; Kissoon, Niranjan; Christian, Michael D.; Devereaux, Asha V.; Dichter, Jeffrey R.; Kissoon, Niranjan; Rubinson, Lewis; Amundson, Dennis; Anderson, Michael R.; Balk, Robert; Barfield, Wanda D.; Bartz, Martha; Benditt, Josh; Beninati, William; Berkowitz, Kenneth A.; Daugherty Biddison, Lee; Braner, Dana; Branson, Richard D; Burkle, Frederick M.; Cairns, Bruce A.; Carr, Brendan G.; Courtney, Brooke; DeDecker, Lisa D.; De Jong, Marla J.; Dominguez-Cherit, Guillermo; Dries, David; Einav, Sharon; Erstad, Brian L.; Etienne, Mill; Fagbuyi, Daniel B.; Fang, Ray; Feldman, Henry; Garzon, Hernando; Geiling, James; Gomersall, Charles D.; Grissom, Colin K.; Hanfling, Dan; Hick, John L.; Hodge, James G.; Hupert, Nathaniel; Ingbar, David; Kanter, Robert K.; King, Mary A.; Kuhnley, Robert N.; Lawler, James; Leung, Sharon; Levy, Deborah A.; Lim, Matthew L.; Livinski, Alicia; Luyckx, Valerie; Marcozzi, David; Medina, Justine; Miramontes, David A.; Mutter, Ryan; Niven, Alexander S.; Penn, Matthew S.; Pepe, Paul E.; Powell, Tia; Prezant, David; Reed, Mary Jane; Rich, Preston; Rodriquez, Dario; Roxland, Beth E.; Sarani, Babak; Shah, Umair A.; Skippen, Peter; Sprung, Charles L.; Subbarao, Italo; Talmor, Daniel; Toner, Eric S.; Tosh, Pritish K.; Upperman, Jeffrey S.; Uyeki, Timothy M.; Weireter, Leonard J.; West, T. Eoin; Wilgis, John; Ornelas, Joe; McBride, Deborah; Reid, David; Baez, Amado; Baldisseri, Marie; Blumenstock, James S.; Cooper, Art; Ellender, Tim; Helminiak, Clare; Jimenez, Edgar; Krug, Steve; Lamana, Joe; Masur, Henry; Mathivha, L. Rudo; Osterholm, Michael T.; Reynolds, H. Neal; Sandrock, Christian; Sprecher, Armand; Tillyard, Andrew; White, Douglas; Wise, Robert; Yeskey, Kevin

    2014-01-01

    BACKGROUND: System-level planning involves uniting hospitals and health systems, local/regional government agencies, emergency medical services, and other health-care entities involved in coordinating and enabling care in a major disaster. We reviewed the literature and sought expert opinions concerning system-level planning and engagement for mass critical care due to disasters or pandemics and offer suggestions for system-planning, coordination, communication, and response. The suggestions in this chapter are important for all of those involved in a pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. METHODS: The American College of Chest Physicians (CHEST) consensus statement development process was followed in developing suggestions. Task Force members met in person to develop nine key questions believed to be most relevant for system-planning, coordination, and communication. A systematic literature review was then performed for relevant articles and documents, reports, and other publications reported since 1993. No studies of sufficient quality were identified upon which to make evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process. RESULTS: Suggestions were developed and grouped according to the following thematic elements: (1) national government support of health-care coalitions/regional health authorities (HC/RHAs), (2) teamwork within HC/RHAs, (3) system-level communication, (4) system-level surge capacity and capability, (5) pediatric patients and special populations, (6) HC/RHAs and networks, (7) models of advanced regional care systems, and (8) the use of simulation for preparedness and planning. CONCLUSIONS: System-level planning is essential to provide care for large numbers of critically ill patients because of disaster or pandemic. It also entails a

  19. Instructional Telecommunications: A Resource and Planning Guide. Bulletin No. 95171.

    ERIC Educational Resources Information Center

    Hanson, Gordon P.

    The educational uses of familiar technologies such as telephones, computers, television sets, videocassette recorders, and radios as well as more sophisticated technologies like satellites, microwave television, and fiber optic systems are discussed. This guide explains how these telecommunication technologies operate, explores the possibilities…

  20. Natural Resource Assessment: An Approach to Science Based Planning in National Parks

    NASA Astrophysics Data System (ADS)

    Mahan, Carolyn G.; Vanderhorst, James P.; Young, John A.

    2009-06-01

    We conducted a natural resource assessment at two national parks, New River Gorge National River and Shenandoah National Park, to help meet the goals of the Natural Resource Challenge—a program to help strengthen natural resource management at national parks. We met this challenge by synthesizing and interpreting natural resource information for planning purposes and we identified information gaps and natural significance of resources. We identified a variety of natural resources at both parks as being globally and/or nationally significant, including large expanses of unfragmented, mixed-mesophytic forests that qualify for wilderness protection, rare plant communities, diverse assemblages of neotropical migratory birds and salamanders, and outstanding aquatic recreational resources. In addition, these parks function, in part, as ecological reserves for plants in and wildlife. With these significant natural resources in mind, we also developed a suite of natural resource management recommendations in light of increasing threats from within and outside park boundaries. We hope that our approach can provide a blueprint for natural resource conservation at publically owned lands.

  1. Natural resource assessment: an approach to science based planning in national parks.

    PubMed

    Mahan, Carolyn G; Vanderhorst, James P; Young, John A

    2009-06-01

    We conducted a natural resource assessment at two national parks, New River Gorge National River and Shenandoah National Park, to help meet the goals of the Natural Resource Challenge--a program to help strengthen natural resource management at national parks. We met this challenge by synthesizing and interpreting natural resource information for planning purposes and we identified information gaps and natural significance of resources. We identified a variety of natural resources at both parks as being globally and/or nationally significant, including large expanses of unfragmented, mixed-mesophytic forests that qualify for wilderness protection, rare plant communities, diverse assemblages of neotropical migratory birds and salamanders, and outstanding aquatic recreational resources. In addition, these parks function, in part, as ecological reserves for plants in and wildlife. With these significant natural resources in mind, we also developed a suite of natural resource management recommendations in light of increasing threats from within and outside park boundaries. We hope that our approach can provide a blueprint for natural resource conservation at publically owned lands. PMID:19365671

  2. Common Core Literacy Lesson Plans: Ready-to-Use Resources, K-5

    ERIC Educational Resources Information Center

    Davis, Lauren

    2013-01-01

    Schools nationwide are transitioning to the Common Core--our advice to you: Don't go it alone! Our new book, "Common Core Literacy Lesson Plans: Ready-to-Use Resources, K-5," shows you that teaching the Common Core State Standards in the elementary grades doesn't have to be intimidating! This easy-to-use guide provides model lesson plans for…

  3. Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States

    SciTech Connect

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-07-11

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations.

  4. Managing Carbon Regulatory Risk in Utility Resource Planning:Current Practices in the Western United States

    SciTech Connect

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-05-16

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. Assuch, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

  5. The natural resources inventory system ASVT project

    NASA Technical Reports Server (NTRS)

    Joyce, A. T.

    1979-01-01

    The hardware/software and the associated procedures for a natural resource inventory and information system based on the use of LANDSAT-acquired multispectral scanner digital data is described. The system is designed to derive land cover/vegetation information from LANDSAT data and geographically reference this information for the production of various types of maps and for the compilation of acreage by land cover/vegetation category. The system also provides for data base building so that the LANDSAT-derived information can be related to information digitized from other sources (e.g., soils maps) in a geographic context in order to address specific applications. These applications include agricultural crop production estimation, erosion hazard-reforestation need assessment, whitetail deer habitat assessment, and site selection. The system is tested in demonstration areas located in the state of Mississippi, and the results of these application demonstrations are presented. A cost-efficiency comparison of producing land cover/vegetation maps and statistics with this system versus the use of small-scale aerial photography is made.

  6. Ontological System for Context Artifacts and Resources

    NASA Astrophysics Data System (ADS)

    Huang, T.; Chung, N. T.; Mukherjee, R. M.

    2012-12-01

    The Adaptive Vehicle Make (AVM) program is a portfolio of programs, managed by the Defense Advanced Research Projects Agency (DARPA). It was established to revolutionize how DoD designs, verifies, and manufactures complex defense systems and vehicles. The Component, Context, and Manufacturing Model Library (C2M2L; pronounced "camel") seeks to develop domain-specific models needed to enable design, verification, and fabrication of the Fast Adaptable Next-Generation (FANG) infantry fighting vehicle using in its overall infrastructure. Terrain models are being developed to represent the surface/fluid that an amphibious infantry fighting vehicle would traverse, ranging from paved road surfaces to rocky, mountainous terrain, slope, discrete obstacles, mud, sand snow, and water fording. Context models are being developed to provide additional data for environmental factors, such as: humidity, wind speed, particulate presence and character, solar radiation, cloud cover, precipitation, and more. The Ontological System for Context Artifacts and Resources (OSCAR) designed and developed at the Jet Propulsion Laboratory is semantic web data system that enables context artifacts to be registered and searched according to their meaning, rather than indexed according to their syntactic structure alone (as in the case for traditional search engines). The system leverages heavily on the Semantic Web for Earth and Environmental Terminology (SWEET) ontologies to model physical terrain environment and context model characteristics. In this talk, we focus on the application of the SWEET ontologies and the design of the OSCAR system architecture.

  7. Continuing Education Resource Manual, North Carolina Community College System.

    ERIC Educational Resources Information Center

    North Carolina Community Coll. System, Raleigh.

    The North Carolina Department of Community Colleges (NCDCC) prepared this reference manual as a resource guide for planning and implementing continuing education (CE) courses. The manual includes essential information on courses, rules, resources, and procedures that are appropriate to course implementation and operation of a continuing education…

  8. Integrated system for planning peripheral bronchoscopic procedures

    NASA Astrophysics Data System (ADS)

    Gibbs, Jason D.; Graham, Michael W.; Yu, Kun-Chang; Higgins, William E.

    2008-03-01

    Bronchoscopy is often performed for diagnosing lung cancer. The recent development of multidetector CT (MDCT) scanners and ultrathin bronchoscopes now enable the bronchoscopic biopsy and treatment of peripheral regions of interest (ROIs). Because the peripheral ROIs are often located several generations within the airway tree, careful planning is required prior to a procedure. The current practice for planning peripheral bronchoscopic procedures, however, is difficult, error-prone, and time-consuming. We propose a system for planning peripheral bronchoscopic procedures using patient-specific MDCT chest scans. The planning process begins with a semi-automatic segmentation of ROIs. The remaining system components are completely automatic, beginning with a new strategy for tracheobronchial airway-tree segmentation. The system then uses a new locally-adaptive approach for finding the interior airway-wall surfaces. From the polygonal airway-tree surfaces, a centerline-analysis method extracts the central axes of the airway tree. The system's route-planning component then analyzes the data generated in the previous stages to determine an appropriate path through the airway tree to the ROI. Finally, an automated report generator gives quantitative data about the route and both static and dynamic previews of the procedure. These previews consist of virtual bronchoscopic endoluminal renderings at bifurcations encountered along the route and renderings of the airway tree and ROI at the suggested biopsy location. The system is currently in use for a human lung-cancer patient pilot study involving the planning and subsequent live image-based guidance of suspect peripheral cancer nodules.

  9. Vendor System Vulnerability Testing Test Plan

    SciTech Connect

    James R. Davidson

    2005-01-01

    The Idaho National Laboratory (INL) prepared this generic test plan to provide clients (vendors, end users, program sponsors, etc.) with a sense of the scope and depth of vulnerability testing performed at the INL’s Supervisory Control and Data Acquisition (SCADA) Test Bed and to serve as an example of such a plan. Although this test plan specifically addresses vulnerability testing of systems applied to the energy sector (electric/power transmission and distribution and oil and gas systems), it is generic enough to be applied to control systems used in other critical infrastructures such as the transportation sector, water/waste water sector, or hazardous chemical production facilities. The SCADA Test Bed is established at the INL as a testing environment to evaluate the security vulnerabilities of SCADA systems, energy management systems (EMS), and distributed control systems. It now supports multiple programs sponsored by the U.S. Department of Energy, the U.S. Department of Homeland Security, other government agencies, and private sector clients. This particular test plan applies to testing conducted on a SCADA/EMS provided by a vendor. Before performing detailed vulnerability testing of a SCADA/EMS, an as delivered baseline examination of the system is conducted, to establish a starting point for all-subsequent testing. The series of baseline tests document factory delivered defaults, system configuration, and potential configuration changes to aid in the development of a security plan for in depth vulnerability testing. The baseline test document is provided to the System Provider,a who evaluates the baseline report and provides recommendations to the system configuration to enhance the security profile of the baseline system. Vulnerability testing is then conducted at the SCADA Test Bed, which provides an in-depth security analysis of the Vendor’s system.b a. The term System Provider replaces the name of the company/organization providing the system

  10. The Implementation Plan for the Uniform Financial Reporting System for Minnesota School Districts.

    ERIC Educational Resources Information Center

    Moir, Ronald E.

    This document was prepared in response to the 1973 Minnesota legislature request to "prepare a detailed plan for a fiscal accounting and reporting system of program expenditures for elementary, secondary, and area vocational schools." The plan addresses the organizational and procedural changes, financial resources, and time necessary to implement…

  11. Graphical interfaces for cooperative planning systems

    NASA Technical Reports Server (NTRS)

    Smith, Philip J.; Layton, Chuck; Mccoy, C. Elaine

    1990-01-01

    Based on a cognitive task analysis of 5 airline flight crews in a simulator study, researchers have designed a testbed for studying computer aids for en route flight path planning. This testbed runs on a Mac II controlling three color monitors, and is being used to study the design of aids for both dispatchers and flight crews. Specifically, the research focuses on design concepts for developing cooperative problem-solving systems. We use en route flight planning (selecting alternate routes or destinations due to unanticipated weather, traffic, malfunctions, etc.) as the context for studying the design of such systems. Researchers are currently exploring three questions in this test environment: (1) When interacting with a flight planning aid, how does the role of the pilot influence overall system performance; (2) Can the architecture for a cooperative planning system be built around Sacerdoti's (1983) concept of an abstraction hierarchy, where the pilot can interact with the system at many different levels of detail (but where the computer aid by default handles lower level details that the pilot has chosen not to deat with); and (3) Can graphical displays and direct manipulation of these displays provide perceptual enhancements (Larkin and Simon, 1987) of the pilot's problem-solving activities. Information is given in viewgraph form.

  12. Production roll out plan for HANDI 2000 business management system

    SciTech Connect

    Adams, D.E.

    1998-09-29

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of Passport (PP) and PeopleSoft (PS) software, supports finance, supply, human resources, and payroll activities under the current PHMC direction. The PP software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheets (MSDS). The PS software is an integrated application for Projects, General Ledger, Human Resources Training, Payroll, and Base Benefits. This set of software constitutes the Business Management System (BMS) and MSDS, a subset of the HANDI 2000 suite of systems. The primary objective of the Production Roll Out Plan is to communicate the methods and schedules for implementation and roll out to end users of BMS.

  13. Remote sensing applications to Missouri environmental resources information system

    NASA Technical Reports Server (NTRS)

    Myers, R. E.

    1977-01-01

    An efficient system for retrieval of remotely sensed data to be used by natural resources oriented agencies, and a natural resources data system that can meet the needs of state agencies were studied. To accomplish these objectives, natural resources data sources were identified, and study of systems already in operation which address themselves to the more efficient utilization of natural resources oriented data was prepared.

  14. Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment

    SciTech Connect

    Not Available

    1994-04-01

    DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

  15. Water resources planning for rivers draining into mobile bay

    NASA Technical Reports Server (NTRS)

    Ng, S.; April, G. C.

    1976-01-01

    A hydrodynamic model describing water movement and tidal elevation is formulated, computed, and used to provide basic data about water quality in natural systems. The hydrodynamic model is based on two-dimensional, unsteady flow equations. The water mass is considered to be reasonably mixed such that integration (averaging) in the depth direction is a valid restriction. Convective acceleration, the Coriolis force, wind and bottom interactions are included as contributing terms in the momentum equations. The solution of the equations is applied to Mobile Bay, and used to investigate the influence that river discharge rate, wind direction and speed, and tidal condition have on water circulation and holdup within the bay. Storm surge conditions, oil spill transport, artificial island construction, dredging, and areas subject to flooding are other topics which could be investigated using the mathematical modeling approach.

  16. Geothermal Resource Area 6: Lander and Eureka Counties. Area development plan

    SciTech Connect

    Robinson, S.; Pugsley, M.

    1981-01-01

    Geothermal Resource Area 6 includes Lander and Eureka Counties. There are several different geothermal resources ranging in temperature from 70/sup 0/F to in excess of 400/sup 0/F within this two county area. Eleven of these resources are considered major and have been selected for evaluation in this area development plan. The various potential uses of the energy found at each of the 11 resource sites were determined after evaluating the study area's physical characteristics, land ownership and land use patterns, existing population and projected growth rates, and transportation facilities. These were then compared with the site specific resource characteristics. The uses considered were divided into five main categories: electrical generation, space heating, recreation, industrial process heat, and agriculture. Within two of these categories certain subdivisions were considered separately. The findings about each of the geothermal sites considered are summarized.

  17. Soil consumption: An innovative system for better planning and managing soil in urban planning context

    NASA Astrophysics Data System (ADS)

    Basile, Angelo; Bonfante, Antonello; Langella, Giuliano; Minieri, Luciana; De Michele, Carlo; D'Antonio, Amedeo; Manna, Piero; Terribile, Fabio

    2015-04-01

    Soil is a key natural resource and most crucial ecosystem services and the most important environmental benefits to humankind and the environment depend by its properties. However, soil is a delicate resource. Urbanization is the most impactful use of soils because it can cancel all its ecosystem functions and ends forever its life cycle since soil is removed completely and/or sealed with a cement/bitumen layer. The absence of an adequate soil culture led common urban planning to do not consider the reality of soil as living multifunctional system. In such framework, this work - performed under the project LIFE + SOILCONSWEB - aims to illustrate a different approach for soil management in spatial planning using a Spatial Decision Support System operating through the web (w-SDSS) to evaluate soil consumption. The system - already operating in an area of Southern Italy (Telese valley, 20,000 ha) - allows - in real time - to provide answers such as (i) the use of land (type and size) on different dates, (ii) mapping and statistics on the sprawl at the municipality scale, (iii) detailed mapping of land fragmentation (and statistical fragmentation) on different dates, (iv) quantification of loss of ecosystem services after potential new urbanization.

  18. Disaster Recovery Planning for Information Systems.

    ERIC Educational Resources Information Center

    Lee, Sooun; Ross, Scott

    1995-01-01

    Discusses the need for businesses to have a disaster recovery plan (DRP) to survive any type of disaster that affects an information system; for example natural disasters, inadvertent errors, or deliberate actions. A five-step guideline is suggested for developing and implementing a DRP. (Author/LRW)

  19. Introduction to the State Planning System.

    ERIC Educational Resources Information Center

    Bassett, Roger; And Others

    The State Planning System (SPS) is a flexible, policy-oriented management tool intended to help analyze possible impacts of various policy decisions. The SPS is able to address a wide range of issues because it depends on the user to provide the relationships and data to be used in the analysis. Such issues might include enrollment shifts among…

  20. Modeling and the State Planning System.

    ERIC Educational Resources Information Center

    Bassett, Roger; Chisholm, Mark

    The State Planning System (SPS) is presented in the context of a mathematical model used to generate information about the possible impacts of postsecondary education policy decisions. Section I provides an introduction to modeling in higher education management, identifies some current postsecondary education modeling efforts, offers some…

  1. Biological Resource Centers and Systems Biology

    PubMed Central

    Wang, Yufeng

    2009-01-01

    There are hundreds of Biological Resource Centers (BRCs) around the world, holding many little-studied microorganism. The proportion of bacterial strains that is well represented in the sequence and literature databases may be as low as 1%. This body of unexplored diversity represents an untapped source of useful strains and derived products. However, a modicum of phenotypic data is available for almost all the bacterial strains held by BRCs around the world. It is at the phenotypic level that our knowledge of the well-studied strains of bacteria and the many yet-to-be studied strains intersects. This suggests we might leverage the phenotypic data from the data-poor bacteria with the omics data from the data-rich bacteria, using our knowledge of their evolutionary relationships, to map the metabolic networks of the little-known bacteria. This systems biology-based approach is a new way to explore the diversity harbored in BRCs. PMID:20157346

  2. 76 FR 43704 - Notice of Intent To Prepare an Amendment to the 1992 Three Rivers Resource Management Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... Management Plan for Land Tenure in the Skull Creek Area and Associated Environmental Assessment, Oregon... planning criteria related to the Amendment to the Three Rivers Resource Management Plan for the Skull Creek...: This plan amendment and associated EA will address a proposed land disposal in the Skull Creek...

  3. Urban Climate Map System for Dutch spatial planning

    NASA Astrophysics Data System (ADS)

    Ren, Chao; Spit, Tejo; Lenzholzer, Sanda; Yim, Hung Lam Steve; Heusinkveld, Bert; van Hove, Bert; Chen, Liang; Kupski, Sebastian; Burghardt, René; Katzschner, Lutz

    2012-08-01

    Facing climate change and global warming, outdoor climatic environment is an important consideration factor for planners and policy makers because improving it can greatly contribute to achieve citizen's thermal comfort and create a better urban living quality for adaptation. Thus, the climatic information must be assessed systematically and applied strategically into the planning process. This paper presents a tool named Urban Climate Map System (UCMS) that has proven capable of helping compact cities to incorporate climate effects in planning processes in a systematic way. UCMS is developed and presented in a Geographic Information System (GIS) platform in which the lessons learned and experience gained from interdisciplinary studies can be included. The methodology of UCMS of compact cities, the construction procedure, and the basic input factors - including the natural climate resources and planning data - are described. Some literatures that shed light on the applicability of UMCS are reported. The Municipality of Arnhem is one of Dutch compact urban areas and still under fast urban development and urban renewal. There is an urgent need for local planners and policy makers to protect local climate and open landscape resources and make climate change adaptation in urban construction. Thus, Arnhem is chosen to carry out a case study of UCMS. Although it is the first work of Urban Climatic Mapping in The Netherlands, it serves as a useful climatic information platform to local planners and policy makers for their daily on-going works. We attempt to use a quick method to collect available climatic and planning data and create an information platform for planning use. It relies mostly on literature and theoretical understanding that has been well practiced elsewhere. The effort here is to synergize the established understanding for a case at hand and demonstrate how useful guidance can still be made for planners and policy makers.

  4. 49 CFR 659.19 - System safety program plan: contents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false System safety program plan: contents. 659.19... State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall... safety program and describes the authority that establishes the system safety program plan. (b) A...

  5. 49 CFR 659.19 - System safety program plan: contents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false System safety program plan: contents. 659.19... State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall... safety program and describes the authority that establishes the system safety program plan. (b) A...

  6. The State University System 2025 System Strategic Plan. Revised

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System 2025 Strategic Plan strengthens the Board of Governors' commitment to achieving excellence in the tripartite mission of its state universities--teaching, research, and public service--for the benefit of Florida's citizens, their communities, and the state economy. The Strategic Plan is a living document that helps align…

  7. Secure resource management: Specifying and testing secure operating systems

    SciTech Connect

    Archer, M.; Frincke, D.A.; Levitt, K. . Div. of Computer Science)

    1990-04-10

    Much work has been devoted to methods for reasoning about the specifications of operating system specifications, the goal being to develop specifications for an operating system that are verified to be secure. Before the verification should be attempted, the specifications should be tested. This paper presents tools that can assist in the security testing of specifications. The first tool is based on the final Algebra Specification and Execution (FASE) system, and would be used to test specifications with real input values. FASE is an executable specification language which is operational in style, in which entities are represented in terms of their observable behavior. To facilitate the testing of an operating system (and its specification), use FASE we have specified a Secure Resource Manager (SRM), a generic template of an operating system. The SRM specification can be specialized to a specification of a particular operating system; the SRM is quite general and handles most features of modern nondistributed operating systems. The second tool, called the PLANNER, is used to derive a sequence of operations that exhibits a security flaw, most often a covert channel for information flow. The PLANNER is based on classical methods of AI planning, specialized to achieve goals concerned with information flow. The tools are demonstrated with respect to a simple operating system specification develop by Millen.

  8. Transportation Planning with Immune System Derived Approach

    NASA Astrophysics Data System (ADS)

    Sugiyama, Kenji; Yaji, Yasuhito; Ootsuki, John Takuya; Fujimoto, Yasutaka; Sekiguchi, Takashi

    This paper presents an immune system derived approach for planning transportation of materials between manufacturing processes in the factory. Transportation operations are modeled by Petri Net, and divided into submodels. Transportation orders are derived from the firing sequences of those submodels through convergence calculation by the immune system derived excitation and suppression operations. Basic evaluation of this approach is conducted by simulation-based investigation.

  9. 76 FR 59156 - Notice of Availability of the Proposed Ironwood Forest National Monument Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... Bureau of Land Management Notice of Availability of the Proposed Ironwood Forest National Monument... Proposed Resource Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the Ironwood Forest... Agency publishes this notice in the Federal Register. ADDRESSES: Copies of the Ironwood Forest...

  10. Forest Service Career Guide. Professional Opportunities in Natural Resource Management, Planning, and Research. Revised Edition.

    ERIC Educational Resources Information Center

    Forest Service (USDA), Washington, DC.

    The guide provides information on professional opportunities in natural resource management, planning, and research. Reasons for careers in forest service are presented and a brief description of the forest service is provided. Career opportunities in the following areas are described: forestry, engineering, geology, hydrology, landscape…

  11. Pressure Point On Campus: Academic Program Planning and Resource Allocation in Conflict with the Bargaining Table.

    ERIC Educational Resources Information Center

    Kieft, Raymond

    Considered are the nature and extent of some of the basic conflicts that arise when two, future-oriented, decision-making processes--institutional program planning/resource allocation and collective bargaining--are both present on the same campus. The identified conflicts come from the experiences of a university that was one of the first in the…

  12. Planning, Timing, and Funding: Profile of the Santa Monica College Library and Learning Resource Center.

    ERIC Educational Resources Information Center

    Aaron, Letitia K.; And Others

    1984-01-01

    Traces the eight-year planning and construction process which resulted in the Santa Monica College Library and Learning Resource Center (LRC). Describes the facilities and services of the LRC, budgeting allocations and financial problems, staffing, and use of automation. (DMM)

  13. 76 FR 59155 - Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... in the Federal Register on August 7, 2007 (72 FR 44173). The BLM held public workshops and scoping... Bureau of Land Management Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION:...

  14. 78 FR 5486 - Notice of Availability of the Draft Resource Management Plan and Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... Environmental Impact Statement for the Grand Junction Field Office in Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Availability. SUMMARY: In accordance with the National Environmental Policy Act... of Land Management (BLM) has prepared a Draft Resource Management Plan (RMP) and Draft...

  15. 75 FR 6218 - New Melones Lake Area Resource Management Plan, Tuolumne and Calaveras Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... published in the Federal Register on November 2, 2009 (74 FR 56656). The written comment period on the Draft... Bureau of Reclamation New Melones Lake Area Resource Management Plan, Tuolumne and Calaveras Counties, CA... a Final RMP/EIS for the New Melones Lake Area. The Final RMP/EIS describes and presents...

  16. Plan to Study the Potential Impacts of Hydraulic Fracturing on Drinking Water Resources (Monterey, CA)

    EPA Science Inventory

    A summary of EPA's research relating to potential impacts of hydraulic fracturing on drinking water resources will be presented. Background about the study plan development will be presented along with an analysis of the water cycle as it relates to hydraulic fracturing processe...

  17. 10 CFR 719.15 - What are the requirements for a staffing and resource plan?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... describing: (1) Major phases likely to be involved in the handling of the matter; (2) Timing and sequence of such phases; (3) Projected cost for each phase of the representation; and (4) Numbers and mix of... staffing and resource plan must include a budget, broken down by phases, including at a minimum: (1)...

  18. 10 CFR 719.15 - What are the requirements for a staffing and resource plan?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... describing: (1) Major phases likely to be involved in the handling of the matter; (2) Timing and sequence of such phases; (3) Projected cost for each phase of the representation; and (4) Numbers and mix of... staffing and resource plan must include a budget, broken down by phases, including at a minimum: (1)...

  19. 10 CFR 719.15 - What are the requirements for a staffing and resource plan?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... describing: (1) Major phases likely to be involved in the handling of the matter; (2) Timing and sequence of such phases; (3) Projected cost for each phase of the representation; and (4) Numbers and mix of... staffing and resource plan must include a budget, broken down by phases, including at a minimum: (1)...

  20. Unfocused Kids: Helping Students To Focus on Their Education and Career Plans. A Resource for Educators.

    ERIC Educational Resources Information Center

    Wakefield, Suzy Mygatt; Sage, Howard; Coy, Doris Rhea

    The primary intent of this book is to provide a hands-on resource for educators in an effort to help all students with their plans after high school. A second purpose is to provide educators with insights about what is occurring in our schoolssuch as the lack of coordinated career guidance services, the number of disengaged students, and the…