  1. Decommissioning of eight surplus production reactors at the Hanford Site, Richland, Washington. Addendum (Final Environmental Impact Statement)

    SciTech Connect

    Not Available

    1992-12-01

    The first section of this volume summarizes the content of the draft environmental impact statement (DEIS) and this Addendum, which together constitute the final environmental impact statement (FEIS) prepared on the decommissioning of eight surplus plutonium production reactors at Hanford. The FEIS consists of two volumes. The first volume is the DEIS as written. The second volume (this Addendum) consists of a summary; Chapter 9, which contains comments on the DEIS and provides DOE`s responses to the comments; Appendix F, which provides additional health effects information; Appendix K, which contains costs of decommissioning in 1990 dollars; Appendix L, which contains additional graphite leaching data; Appendix M, which contains a discussion of accident scenarios; Appendix N, which contains errata; and Appendix 0, which contains reproductions of the letters, transcripts, and exhibits that constitute the record for the public comment period.

  2. Routine environmental audit of the Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  3. 33 CFR 100.1305 - Richland, Washington, west coast outboard championship hydro races.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Richland, Washington, west coast outboard championship hydro races. 100.1305 Section 100.1305 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY REGATTAS AND MARINE PARADES SAFETY OF LIFE ON NAVIGABLE WATERS § 100.1305 Richland, Washington, west...

  4. 33 CFR 100.1305 - Richland, Washington, west coast outboard championship hydro races.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Richland, Washington, west coast outboard championship hydro races. 100.1305 Section 100.1305 Navigation and Navigable Waters COAST GUARD... Richland, Washington, west coast outboard championship hydro races. (a) Regulated area. By this...

  5. 33 CFR 100.1305 - Richland, Washington, west coast outboard championship hydro races.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Richland, Washington, west coast outboard championship hydro races. 100.1305 Section 100.1305 Navigation and Navigable Waters COAST GUARD... Richland, Washington, west coast outboard championship hydro races. (a) Regulated area. By this...

  6. 33 CFR 100.1305 - Richland, Washington, west coast outboard championship hydro races.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Richland, Washington, west coast outboard championship hydro races. 100.1305 Section 100.1305 Navigation and Navigable Waters COAST GUARD... Richland, Washington, west coast outboard championship hydro races. (a) Regulated area. By this...

  7. 33 CFR 100.1305 - Richland, Washington, west coast outboard championship hydro races.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Richland, Washington, west coast outboard championship hydro races. 100.1305 Section 100.1305 Navigation and Navigable Waters COAST GUARD... Richland, Washington, west coast outboard championship hydro races. (a) Regulated area. By this...

  8. Environmental Assessment: Waste Tank Safety Program, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1994-02-01

    The US Department of Energy (DOE) needs to take action in the near-term, to accelerate resolution of waste tank safety issues at the Hanford Site near the City of Richland, Washington, and reduce the risks associated with operations and management of the waste tanks. The DOE has conducted nuclear waste management operations at the Hanford Site for nearly 50 years. Operations have included storage of high-level nuclear waste in 177 underground storage tanks (UST), both in single-shell tank (SST) and double-shell tank configurations. Many of the tanks, and the equipment needed to operate them, are deteriorated. Sixty-seven SSTs are presumed to have leaked a total approximately 3,800,000 liters (1 million gallons) of radioactive waste to the soil. Safety issues associated with the waste have been identified, and include (1) flammable gas generation and episodic release; (2) ferrocyanide-containing wastes; (3) a floating organic solvent layer in Tank 241-C-103; (4) nuclear criticality; (5) toxic vapors; (6) infrastructure upgrades; and (7) interim stabilization of SSTs. Initial actions have been taken in all of these areas; however, much work remains before a full understanding of the tank waste behavior is achieved. The DOE needs to accelerate the resolution of tank safety concerns to reduce the risk of an unanticipated radioactive or chemical release to the environment, while continuing to manage the wastes safely.

  9. Geologic map of the Richland 1:100,000 quadrangle, Washington

    SciTech Connect

    Reidel, S.P.; Fecht, K.R.

    1993-09-01

    This map of the Richland 1:100,000-scale quadrangle, Washington, shows the geology of one of fifteen complete or partial 1:100,000-scale quadrangles that cover the southeast quadrant of Washington. Geologic maps of these quadrangles have been compiled by geologists with the Washington Division of Geology and Earth Resources (DGER) and Washington State University and are the principal data sources for a 1:250,000-scale geologic map of the southeast quadrant of Washington, which is in preparation. Eleven of these quadrangles are being released as DGER open-file reports. The map of the Wenatchee quadrangle has been published by the US Geological Survey, and the Moses Lake, Ritzville quadrangles have already been released.

  10. Environmental Assessment Use of Existing Borrow Areas, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    2001-10-10

    The U.S. Department of Energy (DOE) operates the Hanford Site near Richland, Washington. The DOE needs to identify and operate onsite locations for a continued supply of raw aggregate materials [approximately 7,600,000 cubic meters (10,000,000 cubic yards) over the next 10 years] for new facility construction, maintenance of existing facilities and transportation corridors, and fill and capping material for remediation and other sites.

  11. Lead test assembly irradiation and analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington

    SciTech Connect

    1997-07-01

    The U.S. Department of Energy (DOE) needs to confirm the viability of using a commercial light water reactor (CLWR) as a potential source for maintaining the nation`s supply of tritium. The Proposed Action discussed in this environmental assessment is a limited scale confirmatory test that would provide DOE with information needed to assess that option. This document contains the environmental assessment results for the Lead test assembly irradiation and analysis for the Watts Bar Nuclear Plant, Tennessee, and the Hanford Site in Richland, Washington.

  12. Evaluation of injury/illness recordkeeping pilot course taught in Richland, Washington, January 15, 1992

    SciTech Connect

    Wright, T.S.

    1992-03-01

    This section summarizes trainee evaluations for the Safety Training Section course, Injury/Illness Recordkeeping which was conducted January 15, at Hanford, in Richland Washington. This class was the first pilot course taught. This class was designed to acquaint attendees with DOE orders 5484.1, 5484.1A, draft 3 and the OSHA regulations found in 29 CFR 1904. This goal was partially achieved; the section pertaining to DOE orders must be improve prior to the next pilot class. Section 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees' written comments. Numeric course ratings were generally positive and show that the course material and instruction were very effective. Written comments supported the positive numeric ratings. The course content and knowledge gained by the trainees exceeded most of the students' expectations of the course. Results from the final examination showed that students gained significant knowledge from the course.

  13. Evaluation of injury/illness recordkeeping pilot course taught in Richland, Washington, January 15, 1992

    SciTech Connect

    Wright, T.S.

    1992-03-01

    This section summarizes trainee evaluations for the Safety Training Section course, Injury/Illness Recordkeeping which was conducted January 15, at Hanford, in Richland Washington. This class was the first pilot course taught. This class was designed to acquaint attendees with DOE orders 5484.1, 5484.1A, draft 3 and the OSHA regulations found in 29 CFR 1904. This goal was partially achieved; the section pertaining to DOE orders must be improve prior to the next pilot class. Section 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees` written comments. Numeric course ratings were generally positive and show that the course material and instruction were very effective. Written comments supported the positive numeric ratings. The course content and knowledge gained by the trainees exceeded most of the students` expectations of the course. Results from the final examination showed that students gained significant knowledge from the course.

  14. Sludge stabilization at the Plutonium Finishing Plant, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1994-10-01

    This Environmental Assessment evaluates the proposed action to operate two laboratory-size muffle furnaces in glovebox HC-21C, located in the Plutonium Finishing Plant (PFP), Hanford Site, Richland, Washington. The muffle furnaces would be used to stabilize chemically reactive sludges that contain approximately 25 kilograms (55 pounds) of plutonium by heating to approximately 500 to 1000{degrees}C (900 to 1800{degrees}F). The resulting stable powder, mostly plutonium oxide with impurities, would be stored in the PFP vaults. The presence of chemically reactive plutonium-bearing sludges in the process gloveboxes poses a risk to workers from radiation exposure and limits the availability of storage space for future plant cleanup. Therefore, there is a need to stabilize the material into a form suitable for long-term storage. This proposed action would be an interim action, which would take place prior to completion of an Environmental Impact Statement for the PFP which would evaluate stabilization of all plutonium-bearing materials and cleanout of the facility. However, only 10 percent of the total quantity of plutonium in reactive materials is in the sludges, so this action will not limit the choice of reasonable alternatives or prejudice the Record of Decision of the Plutonium Finishing Plant Environmental Impact Statement.

  15. Environmental consequences of postulated plutonium releases from Exxon Nuclear MOFP, Richland, Washington, as a result of severe natural phenomena

    SciTech Connect

    Jamison, J.D.; Watson, E.C.

    1980-02-01

    Potential environmental consequences in terms of radiation dose to people are presented for postulated plutonium releases caused by severe natural phenomena at the Exxon Nuclear Company Mixed Oxide Fabrication Plant (MOFP), Richland, Washington. The severe natural phenomena considered are earthquakes, tornadoes, high straight-line winds, and floods. Maximum plutonium deposition values are given for significant locations around the site. All important potential exposure pathways are examined. The most likely 50-year committed dose equivalents are given for the maximum-exposed individual and the population within a 50-mile radius of the plant. The maximum plutonium deposition values most likely to occur offsite are also given.

  16. 300 Area process sewer piping upgrade and 300 Area treated effluent disposal facility discharge to the City of Richland Sewage System, Hanford Site, Richland, Washington

    SciTech Connect

    1995-05-01

    The U.S. Department of Energy (DOE) is proposing to upgrade the existing 300 Area Process Sewer System by constructing and operating a new process sewer collection system that would discharge to the 300 Area Treated Effluent Disposal Facility. The DOE is also considering the construction of a tie-line from the TEDF to the 300 Area Sanitary Sewer for discharging the process wastewater to the City of Richland Sewage System. The proposed action is needed because the integrity of the old piping in the existing 300 Area Process Sewer System is questionable and effluents might be entering the soil column from leaking pipes. In addition, the DOE has identified a need to reduce anticipated operating costs at the new TEDF. The 300 Area Process Sewer Piping Upgrade (Project L-070) is estimated to cost approximately $9.9 million. The proposed work would involve the construction and operation of a new process sewer collection system. The new system would discharge the effluents to a collection sump and lift station for the TEDF. The TEDF is designed to treat and discharge the process effluent to the Columbia River. The process waste liquid effluent is currently well below the DOE requirements for radiological secondary containment and is not considered a RCRA hazardous waste or a State of Washington Hazardous Waste Management Act dangerous waste. A National Pollutant Discharge Elimination, System (NPDES) permit has been obtained from the U.S. Environmental Protection Agency for discharge to the Columbia River. The proposed action would upgrade the existing 300 Area Process Sewer System by the construction and operation of a new combined gravity, vacuum, and pressurized process sewer collection system consisting of vacuum collection sumps, pressure pump stations, and buried polyvinyl chloride or similar pipe. Two buildings would also be built to house a main collection station and a satellite collection station.

  17. Masters Thesis- Criticality Alarm System Design Guide with Accompanying Alarm System Development for the Radioisotope Production Laboratory in Richland, Washington

    SciTech Connect

    Greenfield, Bryce A.

    2009-12-01

    A detailed instructional manual was created to guide criticality safety engineers through the process of designing a criticality alarm system (CAS) for Department of Energy (DOE) hazard class 1 and 2 facilities. Regulatory and technical requirements were both addressed. A list of design tasks and technical subtasks are thoroughly analyzed to provide concise direction for how to complete the analysis. An example of the application of the design methodology, the Criticality Alarm System developed for the Radioisotope Production Laboratory (RPL) of Richland, Washington is also included. The analysis for RPL utilizes the Monte Carlo code MCNP5 for establishing detector coverage in the facility. Significant improvements to the existing CAS were made that increase the reliability, transparency, and coverage of the system.

  18. Health assessment for American Smelting and Refining, Tacoma, Washington, Region 10 (addendum to). Final report

    SciTech Connect

    Not Available

    1989-09-25

    The Agency for Toxic Substances and Disease Registry (ATSDR) prepared a Preliminary Health Assessment for the American Smelting and Refining Company (ASARCO) site on January 2, 1989. Since that time, the authors have received two additional reports on the site - the Endangerment Assessment (1) and the Engineering Evaluation/Cost Analysis of Removal Action Alternatives (2) The addendum will specifically address public health concerns related to the contamination of off-site soils with arsenic.

  19. The development of permanent isolation surface barriers: Hanford Site, Richland, Washington, U.S.A.

    SciTech Connect

    Wing, N.R.; Gee, G.W.

    1993-01-01

    Permanent isolation surface barriers are being developed to isolate wastes disposed of in situ (in place) at the US Department of Energy`s Hanford Site in Washington State (USA). The current focus of development efforts is to design barriers that will function in a semiarid to subhumid climate, Emit infiltration and percolation of water through the waste zone to near-zero amounts, be maintenance free, and last up to 1000 years or more. A series of field tests, experiments, and lysimeter studies have been conducted for several years. The results of tests to date confirm that the Hanford barrier concepts are valid for both present and wetter climatic conditions. The data collected also have provided the foundation for the design of a large prototype barrier to be constructed later in 1993. This paper presents the results of some of the field tests, experiments, and lysimeter studies.

  20. Environmental assessment of SP-100 ground engineering system test site: Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1988-12-01

    The US Department of Energy (DOE) proposes to modify an existing reactor containment building (decommissioned Plutonium Recycle Test Reactor (PRTR) 309 Building) to provide ground test capability for the prototype SP-100 reactor. The 309 Building (Figure 1.1) is located in the 300 Area on the Hanford Site in Washington State. The National Environmental Policy Act (NEPA) requires that Federal agencies assess the potential impacts that their actions may have on the environment. This Environmental Assessment describes the consideration given to environmental impacts during reactor concept and test site selection, examines the environmental effects of the DOE proposal to ground test the nuclear subsystem, describes alternatives to the proposed action, and examines radiological risks of potential SP-100 use in space. 73 refs., 19 figs., 7 tabs.

  1. Environmental assessment of SP-100 ground engineering system test site: Hanford Site, Richland, Washington

    NASA Astrophysics Data System (ADS)

    1988-12-01

    The US Department of Energy (DOE) proposes to modify an existing reactor containment building (decommissioned Plutonium Recycle Test Reactor (PRTR) 309 Building) to provide ground test capability for the prototype SP-100 reactor. The 309 Building (Figure 1.1) is located in the 300 Area on the Hanford Site in Washington State. The National Environmental Policy Act (NEPA) requires that Federal agencies assess the potential impacts that their actions may have on the environment. This Environmental Assessment describes the consideration given to environmental impacts during reactor concept and test site selection, examines the environmental effects of the DOE proposal to ground test the nuclear subsystem, describes alternatives to the proposed action, and examines radiological risks of potential SP-100 use in space.

  2. Confirmatory radiological survey for the 190-C Main Pumphouse Facility decommissioning at the Hanford Site, Richland, Washington

    SciTech Connect

    Coleman, R.L.; Forbes, G.H.

    1997-06-01

    An independent assessment of remedial action activities at the 190-C Main Pumphouse Facility at the Hanford Site, Richland, Washington has been accomplished by the Oak Ridge National Laboratory Environmental Assessments Group. The purpose of the assessment was to confirm the site`s compliance with DOE applicable guidelines and provide independent measurements of the activity levels in the 190-C trenches and 105-C process water tunnels. The assessment included reviews of the Decontamination and Decommissioning Plan and data provided in the pre- and post-remedial action surveys. An on-site independent verification survey of the facility was conducted during the period of November 19--21, 1996. The independent verification survey included beta and gamma scans, smears for removable contamination, and direct measurements for beta-gamma activity in the trenches and tunnels. The same measurements and scans, with the addition of alpha measurements, were performed on the floor in the filter repair confinement area. The facility was also spot-checked for direct alpha and beta-gamma activity.

  3. Overview of Phosphate-Based Remediation Technologies At The Hanford Site, Richland Washington

    NASA Astrophysics Data System (ADS)

    Thompson, K. M.; Fruchter, J. S.

    2009-12-01

    Phosphate-based technologies have been tested to sequester strontium-90 and uranium at the Hanford Site, part of the U.S. Department of Energy's (DOE)nuclear weapons complex that encompasses approximately 586 square miles in southeast Washington State. The Columbia River flows through the site (Hanford Reach) where localized groundwater plumes upwell into the river. Efforts to reduce the flux of Sr-90 to the Columbia River from Hanford Site 100-N Area past practice liquid waste disposal sites have been underway since the early 1990s. Termination of all liquid discharges to the ground in 1993 was a major step toward meeting this goal. However, Sr 90 adsorbed onto sediment beneath liquid waste disposal sites, and onto sediment that extends beneath the near-shore riverbed, remains a continuing contaminant source for impacting groundwater and the Columbia River. Initial remediation efforts using a pump-and treat system proved to be ineffective as a long-term solution because of the geochemical characteristics of Sr-90. Following an evaluation of potential Sr-90 treatment technologies and their applicability under 100-N Area hydrogeologic conditions, the U.S. Department of Energy and the Washington State Department of Ecology agreed to evaluate apatite sequestration as the primary remedial technology, combined with a secondary polishing step utilizing phytoextraction if necessary. DOE is also evaluating the efficacy of using polyphosphate to reduce uranium concentrations in the groundwater with the goal of meeting drinking water standards (30 μg/L). This technology works by forming phosphate minerals (autunite and apatite) in the aquifer that directly sequester the existing aqueous uranium in autunite minerals and precipitates apatite minerals for sorption and long-term treatment of uranium migrating into the treatment zone, thus reducing current and future aqueous uranium concentrations. These remedial technologies are being developed by Pacific Northwest National

  4. Interpretation of Ground Penetrating Radar data at the Hanford Site, Richland, Washington

    SciTech Connect

    Bergstrom, K.A.; Mitchell, T.H.; Kunk, J.R.

    1993-07-01

    Ground Penetrating Radar (GPR) is being used extensively during characterization and remediation of chemical and radioactive waste sites at the Hanford Site in Washington State. Time and money for GPR investigations are often not included during the planning and budgeting phase. Therefore GPR investigations must be inexpensive and quick to minimize impact on already established budgets and schedules. An approach to survey design, data collection, and interpretation has been developed which emphasizes speed and budget with minimal impact on the integrity of the interpretation or quality of the data. The following simple rules of thumb can be applied: (1) Assemble as much pre-survey information as possible, (2) Clearly define survey objectives prior to designing the survey and determine which combination of geophysical methods will best meet the objectives, (3) Continuously communicate with the client, before, during and after the investigation, (4) Only experienced GPR interpreters should acquire the field data, (5) Use real-time monitoring of the data to determine where and how much data to collect and assist in the interpretation, (6) Always ``error`` in favor of collecting too much data, (7) Surveys should have closely spaced (preferably 5 feet, no more than 10 feet), orthogonal profiles, (8) When possible, pull the antenna by hand.

  5. Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1994-07-01

    This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ``Safety Measures for Waste Tanks at Hanford Nuclear Reservation,`` of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues.

  6. Environmental assessment for the relocation and storage of isotopic heat sources, Hanford Site, Richland, Washington

    SciTech Connect

    1997-06-01

    As part of a bilateral agreement between the Federal Minister for Research and Technology of the Federal Republic of Germany (FRG) and the DOE, Pacific Northwest National Laboratory (PNNL) developed processes for the treatment and immobilization of high-level radioactive waste. One element of this bilateral agreement was the production of sealed isotopic heat sources. During the mid-1980s, 30 sealed isotopic heat sources were manufactured. The sources contain a total of approximately 8.3 million curies consisting predominantly of cesium-137 and strontium-90 with trace amounts of transuranic contamination. Currently, the sources are stored in A-Cell of the 324 Building. Intense radiation fields from the sources are causing the cell windows and equipment to deteriorate. Originally, it was not intended to store the isotopic heat sources for this length of time in A-cell. The 34 isotopic heat sources are classified as remote handled transuranic wastes. Thirty-one of the isotopic heat sources are sealed, and seals on the three remaining isotopic heat sources have not been verified. However, a decision has been made to place the remaining three isotopic heat sources in the CASTOR cask(s). The Washington State Department of Health (WDOH) has concurred that isotopic heat sources with verified seals or those placed into CASTOR cask(s) can be considered sealed (no potential to emit radioactive air emissions) and are exempt from WAC Chapter 246-247, Radiation Protection-Air Emissions.

  7. A safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-SY-101: Hanford Site,Richland, Washington

    SciTech Connect

    Lentsch, J.W.

    1996-07-01

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101,which is located within the Hanford Site, Richland, Washington.The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  8. Evaluation of P-101 course ``Orientation to Occupational Safety Compliance in DOE`` taught in Richland, Washington, June 16--June 26, 1992

    SciTech Connect

    Colley, D.L.

    1993-03-01

    This report summarizes trainee evaluations for the Safety Training Section course, ``Orientation to Occupational Safety in DOE``, (P-101) which was conducted June 16 to 26, 1992 at Hanford, in Richland, Washington. Sections 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees` written comments.

  9. Evaluation of P-101 course Orientation to Occupational Safety Compliance in DOE'' taught in Richland, Washington, June 16--June 26, 1992

    SciTech Connect

    Colley, D.L.

    1993-03-01

    This report summarizes trainee evaluations for the Safety Training Section course, Orientation to Occupational Safety in DOE'', (P-101) which was conducted June 16 to 26, 1992 at Hanford, in Richland, Washington. Sections 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees' written comments.

  10. Safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-101-SY: Hanford Site, Richland, Washington

    SciTech Connect

    Lentsch, J.W., Westinghouse Hanford

    1996-05-16

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101, which is located within the Hanford Site, Richland, Washington. The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  11. Startup of the New 200 West Pump-and-Treat, Hanford Site, Richland, Washington - 13214

    SciTech Connect

    Byrnes, Mark E.; Simmons, Sally; Morse, John

    2013-07-01

    On June 28, 2012, CH2M HILL Plateau Remediation Company (CHPRC) completed the construction and acceptance testing for a new 2,500 gallon-per-minute (gpm) pump-and-treat (P and T) system in the 200 West Area of the Hanford Site in Washington State. This system is designed to remove Tc-99, carbon tetrachloride, trichloroethene (TCE), nitrate, and total and hexavalent chromium from groundwater using ion exchange, anoxic and aerobic bioreactors, and air stripping. The system will eventually remove uranium from groundwater using ion exchange as well. The startup of the P and T system is important because it will ensure that contaminants from the 200 West Area never reach the Columbia River. When fully operational, the 200 West P and T will include approximately 23 extraction wells and 21 injection wells. The extraction wells are 8 inches in diameter, are completed with well screens 100 feet or more in length, and are distributed throughout the central portion of the 5-square-mile carbon tetrachloride plume. The injection wells are also 8 inches in diameter and are installed up-gradient of the plumes to recharge the aquifer and down-gradient of the plumes for flow-path control. Groundwater in the 200 West Area is approximately 250 feet below ground surface, and the aquifer is 200 feet or more in thickness. All of the contaminants (except nitrate) are found within the perimeter of the carbon tetrachloride plume and occur at various depths throughout the aquifer. The 200 West P and T consists of two separate buildings to conduct groundwater treatment. The RAD building contains an ion exchange system to remove Tc-99 from groundwater at a maximum flow rate of 600 gpm. The RAD building only accepts water from those extraction wells showing elevated Tc-99 concentrations. Groundwater initially fills an influent tank, is then pumped through particulate filters (to remove suspended materials), and then passes through two parallel treatment trains containing Purolite{sup R} A530E

  12. Washington Community Colleges Factbook. Addendum A: Student Enrollments, Academic Year 1977-78.

    ERIC Educational Resources Information Center

    Meier, Terre; Story, Sherie

    In order to reveal trends in community college enrollments in Washington, student demographic and enrollment data for academic year 1977-78 were compiled and compared with figures for previous years. The report provides annualized averages for full-time equivalent (FTE) enrollments for the system for the years 1967 to 1977, and for FTE students by…

  13. Washington Community College Factbook Addendum A: Student Enrollments, Academic Year 1978-79.

    ERIC Educational Resources Information Center

    Meier, Terre

    In order to reveal trends in community college enrollments in Washington, student demographic and enrollment data for academic year 1978-79 were compiled and compared with figures for previous years. The study report provides annualized averages for full-time equivalent (FTE) enrollments for the years 1968-69 to 1978-79 and quarterly and…

  14. Evaluation of M-101 Managing Occupational Safety in DOE' courses taught in Richland, Washington and Los Alamos, New Mexico, January--February 1991

    SciTech Connect

    Vinther, R W

    1991-04-01

    This report summarizes trainee evaluations for the DOE Safety Training Institute's course, Managing Occupational Safety in DOE'', which was conducted four times in January 1991. The first course was a Pilot Course conducted January 8--9, 1991 at Richland, Washington. A second course was taught in Richland on January 17--18, 1991. The last two classes were taught January 29--30, 1991 and January 31--February 1, 1991 in Los Alamos, New Mexico. Trainee evaluations were generally favorable. They reported that the course was especially helpful in the area of management commitment and employee involvement. Most respondents would recommend this course to others. Trainees offered suggestions for modifying the course; these are summarized and described in the report. All written comments were transcribed and are presented in Appendixes A--D. No examinations were administered for these four courses.

  15. Environmental assessment for the resiting, construction, and operation of the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1994-07-01

    This environmental assessment (EA) presents estimated environmental impacts from the resiting, construction, and operation of the US Department of Energy`s (DOE`s) Environmental and Molecular Sciences Laboratory (EMSL), which is proposed to be constructed and operated on land near the south boundary of the Hanford Site near Richland, Washington. The EMSL, if constructed, would be a modern research facility in which experimental, theoretical, and computational techniques can be focused on environmental restoration problems, such as the chemical and transport behavior of complex mixtures of contaminants in the environment. The EMSL design includes approximately 18,500 square meters (200,000 square feet) of floor space on a 12-hectare (30-acre) site. The proposed new site is located within the city limits of Richland in north Richland, at the south end of DOE`s 300 Area, on land to be deeded to the US by the Battelle Memorial Institute. Approximately 200 persons are expected to be employed in the EMSL and approximately 60 visiting scientists may be working in the EMSL at any given time. State-of-the-art equipment is expected to be installed and used in the EMSL. Small amounts of hazardous substances (chemicals and radionuclides) are expected to be used in experimental work in the EMSL.

  16. Accident investigation board report on the May 14, 1997, chemical explosion at the Plutonium Reclamation Facility, Hanford Site,Richland, Washington - final report

    SciTech Connect

    Gerton, R.E.

    1997-07-25

    On May 14, 1997, at 7:53 p.m. (PDT), a chemical explosion occur-red in Tank A- 109 in Room 40 of the Plutonium Reclamation Facility (Facility) located in the 200 West Area of the Hanford Site, approximately 30 miles north of Richland, Washington. The inactive processing Facility is part of the Plutonium Finishing Plant (PFP). On May 16, 1997, Lloyd L. Piper, Deputy Manager, acting for John D. Wagoner, Manager, U.S. Department of Energy (DOE), Richland Operations Office (RL), formally established an Accident Investigation Board (Board) to investigate the explosion in accordance with DOE Order 225. 1, Accident Investigations. The Board commenced its investigation on May 15, 1997, completed the investigation on July 2, 1997, and submitted its findings to the RL Manager on July 26, 1997. The scope of the Board`s investigation was to review and analyze the circumstances of the events that led to the explosion; to analyze facts and to determine the causes of the accident; and to develop conclusions and judgments of need that may help prevent a recurrence of the accident. The scope also included the application of lessons learned from similar accidents within DOE. In addition to this detailed report, a companion document has also been prepared that provides a concise summary of the facts and conclusions of this report, with an emphasis on management issues (DOE/RL-97-63).

  17. Environmental Assessment and Finding of No Significant Impact: Expansion of the Volpentest Hazardous Materials Management and Emergency Response Training and Education Center, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    2002-11-06

    The U.S. Department of Energy needs to provide additional cost-effective personal protection and public safety through expanding training and equipment testing facilities at the Volpentest Hazardous Materials Management and Emergency Response Training and Education Center (HAMMER) on the Hanford Site. The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1412, for expanding training and equipment testing facilities at the Volpentest Hazardous Materials Management and Emergency Response Training and Education Center (HAMMER) on the Hanford Site, Richland, Washington. Based on the analysis in the EA, and considering tribal and agency comments, DOE has determined that the proposed action is not a major federal action significantly affecting the quality of the human environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required.

  18. Evaluation of S-101 course Supervisors' Orientation to Occupational Safety in DOE'' taught in Richland, Washington, May 20--May 23, 1991

    SciTech Connect

    Vinther, R W

    1991-07-01

    This report summarizes trainee evaluations for the DOE Safety Training Institute's course, Supervisors Orientation to Occupational Safety in DOE,'' which was conducted May 20--23, 1991 at Richland, Washington. The first part of the report summarizes the quantitative course evaluations that trainees provided upon completion of the course and provides a transcript of the trainees written comments in Appendix A. The second part summarizes results from the final examination designed to measure the knowledge gained from the course. The third part of the report summarizes course modifications and recommendations for improvement. Numeric course ratings were generally positive and show that the course material and instruction was very effective. Written comments supported the positive numeric ratings. The course content and knowledge gained by the trainees exceeded most of the students expectations of the course. Results from the final examination showed that students gained appropriate knowledge from the course.

  19. Evaluation of P-101 Orientation to Occupational Safety Compliance in DOE'' pilot course taught in Richland, Washington, February 19--March 1, 1991

    SciTech Connect

    Vinther, R W

    1991-04-01

    This report summarizes trainee evaluations for the DOE Safety Training Institute's pilot course, Orientation to Occupational Safety Compliance in DOE,'' which was conducted February 19, 1991--March 1, 1991 at Richland, Washington. Trainee evaluations were very favorable. They reported that their knowledge and familiarity with the OSHA standards were greatly enhanced through the presentation of the course. The first part of the report summarizes the quantitative course evaluations that trainees provided upon completion of the course and provides a transcript of the trainees' written comments. The second part summarizes results from the trainee knowledge survey and the final examination designed to measure the knowledge gained from the course. The third part of the report summarizes course modifications and recommendations for improvement.

  20. Environmental Assessment for the Transfer of 1100 AREA, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    1998-08-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the U.S. Department of Energy's proposed action: the transfer of the 1100 Area, southern rail connection and rolling stock to a non-federal entity. Impact information contained herein will be used by the U.S. Department of Energy, Richland Operations Office Manager, to determine if the proposed action is a major federal action significantly affecting the quality of the human environment. If the proposed action is determined to be major and significant, an environmental impact statement will be prepared. If the proposed action is determined not to be major and significant, a Finding of No Significant Impact (FONSI) will be issued and the action can proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations (CFR) 1508.27. This EA was prepared in compliance with the ''National Environmental Policy Act'' (NEPA) of 1969, as amended, the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508), and the U.S. Department of Energy Implementing Procedures for NEPA (10 CFR 1021). The following is a description of each section of the EA. (1) Purpose and Need for Action. This provides a brief statement concerning the problem or opportunity the U.S. Department of Energy is addressing with the proposed action. As necessary, background information is provided. (2) Description of the Proposed Action. A description with sufficient detail to identify potential environmental impacts is provided. (3) Alternatives to the Proposed Action. Reasonable alternative actions, which would address the Purpose and Need, are described. A no action alternative, as required by 10 CFR 1021, also is described. (4) Affected Environment. This provides a brief description of the locale in which the proposed action takes place, and which may be environmentally impacted. (5) Environmental

  1. 222-S radioactive liquid waste line replacement and 219-S secondary containment upgrade, Hanford Site, Richland, Washington

    SciTech Connect

    1995-01-01

    The U.S. Department of Energy (DOE) is proposing to: (1) replace the 222-S Laboratory (222-S) radioactive liquid waste drain lines to the 219-S Waste Handling Facility (219-S); (2) upgrade 219-S by replacing or upgrading the waste storage tanks and providing secondary containment and seismic restraints to the concrete cells which house the tanks; and (3) replace the transfer lines from 219-S to the 241-SY Tank Farm. This environmental assessment (EA) has been prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of NEPA (40 Code of Federal Regulations [CFR] 1500-1508), and the DOE Implementing Procedures for NEPA (10 CFR 1021). 222-S is used to perform analytical services on radioactive samples in support of the Tank Waste Remediation System and Hanford Site environmental restoration programs. Activities conducted at 222-S include decontamination of analytical processing and support equipment and disposal of nonarchived radioactive samples. These activities generate low-level liquid mixed waste. The liquid mixed waste is drained through pipelines in the 222-S service tunnels and underground concrete encasements, to two of three tanks in 219-S, where it is accumulated. 219-S is a treatment, storage, and/or disposal (TSD) unit, and is therefore required to meet Washington Administrative Code (WAC) 173-303, Dangerous Waste Regulations, and the associated requirements for secondary containment and leak detection. The service tunnels are periodically inspected by workers and decontaminated as necessary to maintain as low as reasonably achievable (ALARA) radiation levels. Although no contamination is reaching the environment from the service tunnels, the risk of worker exposure is present and could increase. 222-S is expected to remain in use for at least the next 30 years to serve the Hanford Site environmental cleanup mission.

  2. 78 FR 16713 - Board Meeting; April 16, 2013; Richland, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ... REVIEW BOARD Board Meeting; April 16, 2013; Richland, WA The U.S. Nuclear Waste Technical Review Board..., The U.S. Nuclear Waste Technical Review Board will hold an open public meeting in Richland, Washington, on Tuesday, April 16, 2013, to review information on U.S. Department of Energy (DOE)...

  3. Environmental Assessment and Finding of No Significant Impact: Widening Trench 36 of the 218-E-12B Low-Level Burial Ground, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    1999-02-11

    This environmental assessment was prepared to assess potential environmental impacts associated with the proposed action to widen and operate unused Trench 36 in the 218-E-12B Low-Level Burial Ground for disposal of low-level waste. Information contained herein will be used by the Manager, U.S. Department of Energy, Richland Operations Office, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No Significant Impact will be issued and the action may proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations 1508.27. This environmental assessment was prepared in compliance with the ''National Environmental Policy Act of1969'', as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of ''National Environmental Policy Act'' (Title 40, Code of Federal Regulations 1500-1508), and the U.S. Department of Energy Implementing Procedures for ''National Environmental Polio Act'' (Title 10, Code of Federal Regulations 1021). The following is a description of each section of this environmental assessment. (1) Purpose and Need for Action. This section provides a brief statement concerning the problem or opportunity the U.S, Department of Energy is addressing with the Proposed Action. Background information is provided. (2) Description of the Proposed Action. This section provides a description of the Proposed Action with sufficient detail to identify potential environmental impacts. (3) Alternatives to the Proposed Action. This section describes reasonable,alternative actions to the Proposed Action, which addresses the Purpose and Need. A No Action Alternative, as required by Title 10, Code of Federal Regulations 1021

  4. HANFORD SITE SUSTAINABILITY PROGRAM RICHLAND WASHINGTON - 12464

    SciTech Connect

    FRITZ LL

    2012-01-12

    In support of implementation of Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance, the Hanford Site Sustainability Plan was developed to implement strategies and activities required to achieve the prescribed goals in the EO as well as demonstrate measurable progress in environmental stewardship at the Hanford Site. The Hanford Site Sustainability Program was developed to demonstrate progress towards sustainability goals as defined and established in Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance; EO 13423, Strengthening Federal Environmental, Energy and Transportation Management, and several applicable Energy Acts. Multiple initiatives were undertaken in Fiscal Year (FY) 2011 to implement the Program and poise the Hanford Site as a leader in environmental stewardship. In order to implement the Hanford Site Sustainability Program, a Sustainability Plan was developed in conjunction with prime contractors, two U.S. Department of Energy (DOE) Offices, and key stakeholders to serve as the framework for measuring progress towards sustainability goals. Based on the review of these metrics and future plans, several activities were initiated to proactively improve performance or provide alternatives for future consideration contingent on available funding. A review of the key metric associated with energy consumption for the Hanford Site in FY 2010 and 2011 indicated an increase over the target reduction of 3 percent annually from a baseline established in FY 2003 as illustrated in Figure 1. This slight increase was attributed primarily from the increased energy demand from the cleanup projects funded by the American Recovery and Reinvestment Act (ARRA) in FY 2010 and 2011. Although it is forecasted that the energy demand will decrease commensurate with the completion of ARRA projects, several major initiatives were launched to improve energy efficiency.

  5. Integrated Hatchery Operations Team: Operations Plans for Anadromous Fish Production Facilities in the Columbia River Basin, Volume IV of IV; Washington: Rocky Reach Hatchery Addendum, 1992 Annual Report.

    SciTech Connect

    Peck, Larry

    1993-08-01

    Rocky Reach Hatchery is located along the Columbia Paver, just downstream from Rocky Reach Dam. Site elevation is 800 feet above sea level. The Turtle Rock Island facility, located 2 miles upstream, is operated as a satellite facility (shared with the Washington Department of Wildlife). The facility is staffed with 2.75 FTE`S. The hatchery was originally designed as a mile-long spawning channel at Turtle Rock Island. Rearing units consist of eight vinyl raceways at Rocky Reach and four rearing ponds at Turtle Rock. Water rights are held by Chelan County PUD and total 3,613 gpm from the Columbia River. Water available for use in the Turtle Rock rearing ponds averages 12,000 gpm from the Columbia River. Rocky Reach Hatchery and the Turtle Rock satellite facility are owned by Chelan County PUD. They are operated as mitigation facilities for the fishery impacts caused by the construction and operation of Rocky Reach Dam. Rocky Reach Hatchery is used for incubation and early rearing of upriver bright (URB) fall chinook. Fingerlings are later transferred to the Turtle Rock facility for final rearing and release.

  6. Environmental Assessment and Finding of No Significant Impact: Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    2002-03-22

    The U.S. Department of Energy, Richland Operations Office (DOE-RL) needs to improve management of post-1970, contact-handled (CH) suspect transuranic (TRU) waste containers (primarily drums) that are stacked in modules and covered with soil in the Low-Level Burial Grounds (LLBG).

  7. 78 FR 29436 - Proposed Information Collection (HUD/VA Addendum to Uniform Residential Loan Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ...), Department of Veterans Affairs, 810 Vermont Avenue NW., Washington, DC 20420 or email nancy.kessinger@va.gov... AFFAIRS Proposed Information Collection (HUD/VA Addendum to Uniform Residential Loan Application) Activity.... SUMMARY: The Veterans Benefits Administration (VBA), Department of Veterans Affairs (VA), is announcing...

  8. Richland Operations Office technology summary

    SciTech Connect

    Not Available

    1994-05-01

    This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

  9. Columbia River monitoring: Distribution of tritium in Columbia River water at the Richland Pumphouse

    SciTech Connect

    Dirkes, R.L.

    1993-02-01

    The Surface Environmental Surveillance Project (SESP) is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This report presents the results of a special study conducted as part of the SESP to supplement the routine Columbia River monitoring program and provide information relative to the dispersion and distribution of Hanford origin contaminants entering the river through the seepage of ground water along the Hanford Site. Sampling was conducted along cross sections to determine the distribution of tritium within the Columbia River at Richland, Washington. The investigation was also designed to evaluate the relationship between the average tritium concentrations in the river water at this location and in water collected from the routine SESP river monitoring system located at the city of Richland drinking water intake (Richland Pumphouse). This study was conducted during the summers of 1987 and 1988. Water samples were collected along cross sections located at or near the Richland Pumphouse monitoring station.

  10. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs.

  11. Vapor space sampling of ferrocyanide tanks, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1991-07-01

    Environmental assessment (EA), to assess environmental impacts associated with tank vapor space (dome) gas sampling of 24 Hanford Site single-shell waste tanks that contain ferrocyanide-nitrate compounds to determine whether or not the tanks contain flammable or toxic gases. The proposed action would be conducted using non-sparking materials, sparkless tools, and a portable containment shelter (greenhouse) and plastic ground cover. DOE needs to take this action to help define the required controls to prevent or mitigate the potential for an accident during future, more intrusive sampling of these tanks. Based on the evaluation in the EA (which examined the environmental impacts of the proposed action and reasonable alternatives), DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969. Therefore, the preparation of an Environmental Impact Statement is not required, and the Department is issuing this Finding of No Significant Impact (FONSI).

  12. Environmental assessment, K Pool fish rearing, Hanford Site, Richland, Washington

    SciTech Connect

    1996-12-01

    The US Department of Energy (DOE) has a need to respond to a request to lease facilities at the Hanford Site 100-KE and 100-KW filter plant pools (K Pools) for fish rearing activities. These fish rearing activities would be: (1) business ventures with public and private funds and (2) long-term enhancement and supplementation programs for game fish populations in the Columbia River Basin. The proposed action is to enter into a use permit or lease agreement with the YIN or other parties who would rear fish in the 100-K Area Pools. The proposed action would include necessary piping, pump, and electrical upgrades of the facility; cleaning and preparation of the pools; water withdrawal from the Columbia River, and any necessary water or wastewater treatment; and introduction, rearing and release of fish. Future commercial operations may be included.

  13. Isotope Production at the Hanford Site in Richland, Washington

    SciTech Connect

    Ammoniums

    1999-06-01

    This report was prepared in response to a request from the Nuclear Energy Research Advisory Committee (NERAC) subcommittee on ''Long-Term Isotope Research and Production Plans.'' The NERAC subcommittee has asked for a reply to a number of questions regarding (1) ''How well does the Department of Energy (DOE) infrastructure sme the need for commercial and medical isotopes?'' and (2) ''What should be the long-term role of the federal government in providing commercial and medical isotopes?' Our report addresses the questions raised by the NERAC subcommittee, and especially the 10 issues that were raised under the first of the above questions (see Appendix). These issues are related to the isotope products offered by the DOE Isotope Production Sites, the capabilities and condition of the facilities used to produce these products, the management of the isotope production programs at DOE laboratories, and the customer service record of the DOE Isotope Production sites. An important component of our report is a description of the Fast Flux Test Facility (FFTF) reactor at the Hbford Site and the future plans for its utilization as a source of radioisotopes needed by nuclear medicine physicians, by researchers, and by customers in the commercial sector. In response to the second question raised by the NERAC subcommittee, it is our firm belief that the supply of isotopes provided by DOE for medical, industrial, and research applications must be strengthened in the near future. Many of the radioisotopes currently used for medical diagnosis and therapy of cancer and other diseases are imported from Canada, Europe, and Asia. This situation places the control of isotope availability, quality, and pricing in the hands of non-U.S. suppliers. It is our opinion that the needs of the U.S. customers for isotopes and isotope products are not being adequately served, and that the DOE infrastructure and facilities devoted to the supply of these products must be improved This perception forms one of the fundamental bases for our proposal that the FFTF, which is currently in a standby condition, be reactivated to supply nuclear services and products such as radioisotopes needed by the U.S. medical, industrial, and research communities.

  14. Xenia Spacecraft Study Addendum: Spacecraft Cost Estimate

    NASA Technical Reports Server (NTRS)

    Hill, Spencer; Hopkins, Randall

    2009-01-01

    This slide presentation reviews the Xenia spacecraft cost estimates as an addendum for the Xenia Spacecraft study. The NASA/Air Force Cost model (NAFCPOM) was used to derive the cost estimates that are expressed in 2009 dollars.

  15. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    SciTech Connect

    Chou, C.J.; Johnson, V.G.

    1999-10-07

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan.

  16. ADDENDUM TO THE USER'S GUIDE FOR MPTER

    EPA Science Inventory

    The addendum applies to the 'User's Guide for MPTER -- A Multiple Point Gaussain Dispersion Algorithm with Optional Terrain Adjustment' of Pierce and Turner, 1980. While the cited document describes the features of the MPTER model, its technical basis, and applications, this adde...

  17. Action Plan for Florida's Public Libraries. Addendum.

    ERIC Educational Resources Information Center

    Florida Library Study Commission, Tallahassee.

    The introduction to this addendum (the Action Plan is LI 004 521) discusses the present use by libraries of information-handling technology and identifies some of the trends taking place in performing essential library services. While some limited inroads have been made in automating certain public library functions, the bulk of services is still…

  18. 48 CFR 1352.239-70 - Software license addendum.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Software license addendum. As prescribed in 48 CFR 1339.107, insert the following clause: Software License... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Software license addendum. 1352.239-70 Section 1352.239-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE...

  19. 48 CFR 1352.239-70 - Software license addendum.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Software license addendum. As prescribed in 48 CFR 1339.107, insert the following clause: Software License... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Software license addendum. 1352.239-70 Section 1352.239-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE...

  20. 48 CFR 1352.239-70 - Software license addendum.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Software license addendum. As prescribed in 48 CFR 1339.107, insert the following clause: Software License... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Software license addendum. 1352.239-70 Section 1352.239-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE...

  1. 48 CFR 1352.239-70 - Software license addendum.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Software license addendum. As prescribed in 48 CFR 1339.107, insert the following clause: Software License... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Software license addendum. 1352.239-70 Section 1352.239-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE...

  2. 48 CFR 1352.239-70 - Software license addendum.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Software license addendum. As prescribed in 48 CFR 1339.107, insert the following clause: Software License... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Software license addendum. 1352.239-70 Section 1352.239-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE...

  3. Geodetic strain measurements in Washington.

    USGS Publications Warehouse

    Savage, J.C.; Lisowski, M.; Prescott, W.H.

    1981-01-01

    Two new geodetic measurements of strain accumulation in the state of Washington for the interval 1972-1979 are reported. Near Seattle the average principal strain rates are 0.07 + or - 0.03 mu strain/yr N19oW and -0.13 + or - 0.02 mu strain/yr N71oE, and near Richland (south central Washington) the average principal strain rates are -0.02 + or - 0.01 mu strain/yr N36oW and -0.04 + or - 0.01 mu strain/yr N54oE. Extension is taken as positive, and the uncertainties quoted are standard deviations. A measurement of shear strain accumulation (dilation not determined) in the epoch 1914- 1966 along the north coast of Vancouver Island by the Geodetic Survey of Canada indicates a marginally significant accumulation of right-lateral shear (0.06 + or - 0.03 mu rad/yr) across the plate boundary (N40oW strike). Although there are significant differences in detail, these strain measurements are roughly consistent with a crude dislocation model that represents subduction of the Juan de Fuca plate. The observed accumulation of strain implies that large, shallow, thrust earthquakes should be expected off the coast of Washington and British Columbia. However, this conclusion is not easily reconciled with either observations of elevation change along the Washington coast or the focal mechanism solutions for shallow earthquakes in Washington. -Authors

  4. Addendum to NuMI shielding assessment

    SciTech Connect

    Vaziri, Kamran; /Fermilab

    2007-10-01

    The original safety assessment and the Safety Envelope for the NuMI beam line corresponds to 400 kW of beam power. The Main Injector is currently capable of and approved for producing 500 kW of beam power2. However, operation of the NuMI beam line at 400 kW of power brings up the possibility of an occasional excursion above 400 kW due to better than usual tuning in one of the machines upstream of the NuMI beam line. An excursion above the DOE approved Safety Envelope will constitute a safety violation. The purpose of this addendum is to evaluate the radiological issues and modifications required to operate the NuMI beam line at 500 kW. This upgrade will allow 400 kW operations with a reasonable safety margin. Configuration of the NuMI beam line, boundaries, safety system and the methodologies used for the calculations are as described in the original NuMI SAD. While most of the calculations presented in the original shielding assessment were based on Monte Carlo simulations, which were based on the design geometries, most of the results presented in this addendum are based on the measurements conducted by the AD ES&H radiation safety group.

  5. PAT-1 safety analysis report addendum.

    SciTech Connect

    Weiner, Ruth F.; Schmale, David T.; Kalan, Robert J.; Akin, Lili A.; Miller, David Russell; Knorovsky, Gerald Albert; Yoshimura, Richard Hiroyuki; Lopez, Carlos; Harding, David Cameron; Jones, Perry L.; Morrow, Charles W.

    2010-09-01

    The Plutonium Air Transportable Package, Model PAT-1, is certified under Title 10, Code of Federal Regulations Part 71 by the U.S. Nuclear Regulatory Commission (NRC) per Certificate of Compliance (CoC) USA/0361B(U)F-96 (currently Revision 9). The purpose of this SAR Addendum is to incorporate plutonium (Pu) metal as a new payload for the PAT-1 package. The Pu metal is packed in an inner container (designated the T-Ampoule) that replaces the PC-1 inner container. The documentation and results from analysis contained in this addendum demonstrate that the replacement of the PC-1 and associated packaging material with the T-Ampoule and associated packaging with the addition of the plutonium metal content are not significant with respect to the design, operating characteristics, or safe performance of the containment system and prevention of criticality when the package is subjected to the tests specified in 10 CFR 71.71, 71.73 and 71.74.

  6. Hanford Tank Farms Vadose Zone Addendum to the TY Tank Farm Report

    SciTech Connect

    Spatz, Robert

    2000-08-01

    This addendum to the TY Tank Farm Report (GJO-97-30-TAR, GJO-HAN-16) published in January 1998 incorporates the results of high-rate and repeat logging activities along with shape factor analysis of the logging data. A high-rate logging system was developed and deployed in the TY Tank Farm to measure cesium-137 concentration levels in high gamma flux zones where the spectral gamma logging system was unable to collect usable data because of high dead times and detector saturation. This report presents additional data and revised visualizations of subsurface contaminant distribution in the TY Tank Farm at the DOE Hanford Site in the state of Washington.

  7. Hanford Tank Farms Vadose Zone Addendum to the S Tank Farm Report

    SciTech Connect

    Pearson, A.

    2000-08-01

    This addendum to the S Tank Farm Report (GJO-97-31-TAR, GJO-HAN-17) published in February 1998 incorporates the results of high-rate and repeat logging activities along with shape factor analysis of the logging data. A high-rate logging system was developed and deployed in the S Tank Farm to measure cesium-137 concentration levels in high gamma flux zones where the spectral gamma logging system was unable to collect usable data because of high dead times and detector saturation. This report presents additional data and revised visualizations of subsurface contaminant distribution in the S Tank Farm at the DOE Hanford Site in the state of Washington.

  8. Hanford Tank Farms Vadose Zone, Addendum to the T Tank Farm Report

    SciTech Connect

    Spatz, Robert

    2000-07-01

    This addendum to the T Tank Farm Report (GJO-99-101-TARA, GJO-HAN-27) published in September 1999 incorporates the results of high-rate and repeat logging activities along with shape factor analysis of the logging incorporates the results of high-rate and repeat logging activities along with shape factor analysis of the logging data. A high-rate logging system was developed and deployed in the T Tank Farm to measure cesium-137 concentration levels in high gamma flux zones where the spectral gamma logging system was unable to collect usable data because of high dead times and detector saturation. This report presents additional data and revised visualizations of subsurface contaminant distribution in the T Tank Farm at the DOE Hanford Site in the state of Washington.

  9. Hanford Tank Farms Vadose Zone, Addendum to the TX Tank Farm Report

    SciTech Connect

    Spatz, R.

    2000-08-01

    This addendum to the TX Tank Farm Report (GJO-97-13-TAR, GJO-HAN-11) published in September 1997 incorporates the results of high-rate and repeat logging activities along with shape factor analysis of the logging data. A high-rate logging system was developed and deployed in the TX Tank Farm to measure cesium-137 concentration levels in high gamma flux zones where the spectral gamma logging system was unable to collect usable data because of high dead times and detector saturation. This report presents additional data and revised visualizations of subsurface contaminant distribution in the TX Tank Farm at the DOE Hanford Site in the state of Washington.

  10. Hanford Tank Farms Vadose Zone, Addendum to the BX Tank Farm Report

    SciTech Connect

    Pearson, A.W.

    2000-07-01

    This addendum to the BX Tank Farm Report (GJO-98-40-TARA, GJO-HAN-19) published in August 1998 incorporates the results of high-rate and repeat logging activities along with shape factor analysis of the logging data. A high-rate logging system was developed and deployed in the BX Tank Farm to measure cesium-137 concentration levels in high gamma flux zones where the spectral gamma logging system was unable to collect usable data because of high dead times and detector saturation. This report presents additional data and revised visualizations of subsurface contaminant distribution in the BX Tank Farm at the DOE Hanford Site in the state of Washington.

  11. Washington Correlator

    NASA Technical Reports Server (NTRS)

    Hall, David M.; Boboltz, David

    2013-01-01

    This report summarizes the activities of the Washington Correlator for 2012. The Washington Correlator provides up to 80 hours of attended processing per week plus up to 40 hours of unattended operation, primarily supporting Earth Orientation and astrometric observations. In 2012, the major programs supported include the IVS-R4, IVS-INT, APSG, and CRF observing sessions.

  12. Recharge to the North Richland well field

    SciTech Connect

    Law, A.G.

    1989-07-01

    The investigation was based on a preliminary ground-water flow model of the 1100 Area. Because few local data were available for this effort, an existing regional ground-water flow model of the Hanford Site was applied, which is based on the Variable Thickness Transient (VTT) ground-water flow code (Kipp et al., 1976). A submodel of the Hanford Site model was developed based on the VTT code. An independent model consisting of a simple representation of the local conditions in the vicinity of the North Richland well field was also used in the investigation. This model, based on the MODFLOW code (McDonald and Harbaugh, 1984), was used in a series of transient simulations to examine dynamic aspects of the well field/recharge basin. Results from this simple model also provide an independent, qualitative check of results produced with the 1100 Area model based on the VTT code. This report summarizes the 1100 Area modeling investigation, including the approach used to generate results for the regional and 1100 Area VTT models, the approach used in the transient MODFLOW model, results from some initial steady-state and transient simulations with the submodel and the MODFLOW models, and resulting conclusions and recommendations. Because local data were lacking to develop and calibrate the models, the investigation described in this report can best be described as a ''sensitivity analysis'' of ground-water flow in the 1100 Area. 4 refs., 10 figs., 2 tabs.

  13. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  14. Presto 4.20 user's guide : addendum for shock capabilities.

    SciTech Connect

    Spencer, Benjamin Whiting

    2011-06-01

    This is an addendum to the Presto 4.20 User's Guide to document additional capabilities that are available for use in the Presto{_}ITAR code that are not available for use in the standard version of Presto. Presto{_}ITAR is an enhanced version of Presto that provides capabilities that make it regulated under the U.S. Department of State's International Traffic in Arms Regulations (ITAR) export-control rules. This code is part of the Vivace product, and is only distributed to entities that comply with ITAR regulations. The enhancements primarily focus on material models that include an energy-dependent pressure response, appropriate for very large deformations and strain rates. Since this is an addendum to the standard Presto User's Guide, please refer to that document first for general descriptions of code capability and use. This addendum documents material models and element features that support energy-dependent material models.

  15. Addendum to Environmental Monitoring Plan, Nevada Test Site and Support Facilities; Addendum 2

    SciTech Connect

    1993-11-01

    This 1993 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/10630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Operations Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1993 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

  16. Workforce: Washington

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2006

    2006-01-01

    In Washington, the demand for well-educated employees will only increase over the next several years. In the decade leading up to 2012, healthcare occupations will see growth of 20 percent. Teachers will be in demand: nearly 9,000 new elementary and middle-school educators will need to be hired. Computer fields will undergo growth of 24 percent,…

  17. Optimum Design Of Addendum Surfaces In Sheet Metal Forming Process

    NASA Astrophysics Data System (ADS)

    Debray, K.; Sun, Z. C.; Radjai, R.; Guo, Y. Q.; Dai, L.; Gu, Y. X.

    2004-06-01

    The design of addendum surfaces in sheet forming process is very important for the product quality, but it is very time-consuming and needs tedious trial-error corrections. In this paper, we propose a methodology to automatically generate the addendum surfaces and then to optimize them using a forming modelling solver. The surfaces' parameters are taken as design variables and modified in course of optimization. The finite element mesh is created on the initial addendum surfaces and mapped onto the modified surfaces without remeshing operation. The Feasible Sequential Quadratic Programming (FSQP) is adopted as our algorithm of optimization. Two objective functions are used: the first one is the thickness function to minimize the thickness variation on the workpiece ; the second one is the appearance function aiming to avoid the scratching defects on the external surfaces of panels. The FSQP is combined with our "Inverse Approach" or "One Step Approach" which is a very fast forming solver. This leads to a very efficient optimization procedure. The present methodology is applied to a square box. The addendum surfaces are characterised by four geometrical variables. The influence of optimization criteria is studied and discussed.

  18. Sci-Tech Books of 1977: An Addendum

    ERIC Educational Resources Information Center

    Mount, Ellis; Crockett, Edith S.

    1978-01-01

    The 35 titles in this annotated bibliography complete the list of 100 best sci-tech titles; the first 65 appeared in the March 1, 1978 issue. Major subject subdivisions in this addendum include astronomy, earth sciences, and general science. (JAB)

  19. Education in Utah: A Call to Action. Addendum.

    ERIC Educational Resources Information Center

    Utah State Board of Education, Salt Lake City.

    Clarifications to recommendations made in the Utah Education Reform Committee report, "A Call to Action," are presented in this addendum. Earlier recommendations relating to teachers are revised and clarified and new ones relating to class size, teachers' duties, instructional materials, and the student-parent-school relationship are added.…

  20. 10 CFR 1045.41 - Use of classified addendums.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Use of classified addendums. 1045.41 Section 1045.41 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NUCLEAR CLASSIFICATION AND DECLASSIFICATION Generation and Review of Documents Containing Restricted Data and Formerly Restricted Data § 1045.41 Use...

  1. 10 CFR 1045.41 - Use of classified addendums.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Use of classified addendums. 1045.41 Section 1045.41 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NUCLEAR CLASSIFICATION AND DECLASSIFICATION Generation and Review of Documents Containing Restricted Data and Formerly Restricted Data § 1045.41 Use...

  2. 10 CFR 1045.41 - Use of classified addendums.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Use of classified addendums. 1045.41 Section 1045.41 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NUCLEAR CLASSIFICATION AND DECLASSIFICATION Generation and Review of Documents Containing Restricted Data and Formerly Restricted Data § 1045.41 Use...

  3. 10 CFR 1045.41 - Use of classified addendums.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Use of classified addendums. 1045.41 Section 1045.41 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NUCLEAR CLASSIFICATION AND DECLASSIFICATION Generation and Review of Documents Containing Restricted Data and Formerly Restricted Data § 1045.41 Use...

  4. 10 CFR 1045.41 - Use of classified addendums.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Use of classified addendums. 1045.41 Section 1045.41 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NUCLEAR CLASSIFICATION AND DECLASSIFICATION Generation and Review of Documents Containing Restricted Data and Formerly Restricted Data § 1045.41 Use...

  5. Revolutionary opportunities for materials and structures study, addendum

    NASA Technical Reports Server (NTRS)

    Feig, P. D.

    1987-01-01

    This report is an addendum to the Revolutionary Opportunities for Materials and Structures Study (ROMS), modifying the original by the addition of two tasks. The primary purpose of these tasks was to conduct additional aircraft/engine sizing and mission analysis to obtain contributory aircraft performance data such as fuel burns and direct operating costs for both the subsonic and supersonic engines.

  6. Vapor space sampling of ferrocyanide tanks, Hanford Site, Richland, Washington. Environmental Assessment

    SciTech Connect

    Not Available

    1991-07-01

    Environmental assessment (EA), to assess environmental impacts associated with tank vapor space (dome) gas sampling of 24 Hanford Site single-shell waste tanks that contain ferrocyanide-nitrate compounds to determine whether or not the tanks contain flammable or toxic gases. The proposed action would be conducted using non-sparking materials, sparkless tools, and a portable containment shelter (greenhouse) and plastic ground cover. DOE needs to take this action to help define the required controls to prevent or mitigate the potential for an accident during future, more intrusive sampling of these tanks. Based on the evaluation in the EA (which examined the environmental impacts of the proposed action and reasonable alternatives), DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969. Therefore, the preparation of an Environmental Impact Statement is not required, and the Department is issuing this Finding of No Significant Impact (FONSI).

  7. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  8. Water Monitoring Report for the 200 W Area Tree Windbreak, Hanford Site Richland, Washington

    SciTech Connect

    Gee, Glendon W. ); Carr, Jennifer S. ); Goreham, John O. ); Strickland, Christopher E. )

    2002-09-18

    Water inputs to the vadose zone from irrigation of a tree windbreak in the 200 W Area of the Hanford Site were monitored during the summer of 2002. Water flux and soil-water contents were measured within the windbreak and at two locations just east of the windbreak to assess the impact of the irrigation on the vadose zone and to assist in optimizing the irrigation applications. In May 2002, instrumentation was placed in auger holes and backfilled with local soil. Sensors were connected to a data acquisition system (DAS), and the data were telemetered to the laboratory via digital modem in late June 2002. Data files and graphics were made web accessible for instantaneous retrieval. Precipitation, drip irrigation, deep-water flux, soil-water content, and soil-water pressures have been monitored on a nearly continuous basis from the tree-line site since June 26, 2002.

  9. Tank 241-C-106 past-practice sluicing waste retrieval, Hanford Site, Richland, Washington. Environmental Assessment

    SciTech Connect

    1995-02-01

    The US Department of Energy (DOE) needs to take action to eliminate safety concerns with storage of the high-heat waste in Tank 241-C-106 (Tank C-106), and demonstrate a tank waste retrieval technology. This Environmental Assessment (EA) was prepared to analyze the potential impacts associated with the proposed action, past-practice sluicing of Tank C-106, an underground single-shell tank (SST). Past-practice sluicing is defined as the mode of waste retrieval used extensively in the past at the Hanford Site on the large underground waste tanks, and involves introducing a high-volume, low-pressure stream of liquid to mobilize sludge waste prior to pumping. It is proposed to retrieve the waste from Tank C-106 because this waste is classified not only as transuranic and high-level, but also as high-heat, which is caused by the radioactive decay of strontium. This waste characteristic has led DOE to place Tank C-106 on the safety ``Watchlist.``

  10. Management of Hanford Site non-defense production reactor spent nuclear fuel, Hanford Site, Richland, Washington

    SciTech Connect

    1997-03-01

    The US Department of Energy (DOE) needs to provide radiologically, and industrially safe and cost-effective management of the non-defense production reactor spent nuclear fuel (SNF) at the Hanford Site. The proposed action would place the Hanford Site`s non-defense production reactor SNF in a radiologically- and industrially-safe, and passive storage condition pending final disposition. The proposed action would also reduce operational costs associated with storage of the non-defense production reactor SNF through consolidation of the SNF and through use of passive rather than active storage systems. Environmental, safety and health vulnerabilities associated with existing non-defense production reactor SNF storage facilities have been identified. DOE has determined that additional activities are required to consolidate non-defense production reactor SNF management activities at the Hanford Site, including cost-effective and safe interim storage, prior to final disposition, to enable deactivation of facilities where the SNF is now stored. Cost-effectiveness would be realized: through reduced operational costs associated with passive rather than active storage systems; removal of SNF from areas undergoing deactivation as part of the Hanford Site remediation effort; and eliminating the need to duplicate future transloading facilities at the 200 and 400 Areas. Radiologically- and industrially-safe storage would be enhanced through: (1) removal from aging facilities requiring substantial upgrades to continue safe storage; (2) utilization of passive rather than active storage systems for SNF; and (3) removal of SNF from some storage containers which have a limited remaining design life. No substantial increase in Hanford Site environmental impacts would be expected from the proposed action. Environmental impacts from postulated accident scenarios also were evaluated, and indicated that the risks associated with the proposed action would be small.

  11. Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, Washington

    SciTech Connect

    N /A

    2003-04-11

    This ''Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement'' (HSW EIS) covers three primary aspects of waste management at Hanford--waste treatment, storage, and disposal. It also addresses four kinds of solid waste--low-level waste (LLW), mixed (radioactive and chemically hazardous) low-level waste (MLLW), transuranic (TRU) waste, and immobilized low-activity waste (ILAW). It fundamentally asks the question: how should we manage the waste we have now and will have in the future? This EIS analyzes the impacts of the LLW, MLLW, TRU waste, and ILAW we currently have in storage, will generate, or expect to receive at Hanford. The HSW EIS is intended to help us determine what specific facilities we will continue to use, modify, or construct to treat, store, and dispose of these wastes (Figure S.1). Because radioactive and chemically hazardous waste management is a complex, technical, and difficult subject, we have made every effort to minimize the use of acronyms (making an exception for our four waste types listed above), use more commonly understood words, and provide the ''big picture'' in this summary. An acronym list, glossary of terms, and conversions for units of measure are provided in a readers guide in Volume 1 of this EIS.

  12. Solar heating, cooling, and hot water systems installed at Richland, Washington

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The project described is part of the U. S. Department of Energy's solar demonstration program, and became operational in April 1978. The solar system uses 6,000 square feet of flat-plate liquid collectors in a closed loop to deliver solar energy through a liquid-liquid heat exchanger to the building heat-pump duct work or 9,000-gallon thermal energy storage tank. A 25-ton Arkla solar-driven absorption chiller provides the cooling, in conjunction with a 2,000 gallon chilled water storage tank and reflective ponds on three sides of the building surplus heat. A near-by building is essentially identical except for having conventional heat-pump heating and cooling, and can serve as an experimental control. An on-going public relations program was provided from the beginning of the program, and resulted in numerous visitors and tour groups.

  13. Environmental Assessment: Relocation and storage of TRIGA{reg_sign} reactor fuel, Hanford Site, Richland, Washington

    SciTech Connect

    1995-08-01

    In order to allow the shutdown of the Hanford 308 Building in the 300 Area, it is proposed to relocate fuel assemblies (101 irradiated, three unirradiated) from the Mark I TRIGA Reactor storage pool. The irradiated fuel assemblies would be stored in casks in the Interim Storage Area in the Hanford 400 Area; the three unirradiated ones would be transferred to another TRIGA reactor. The relocation is not expected to change the offsite exposure from all Hanford Site 300 and 400 Area operations.

  14. Atmospheric dispersion of ammonia accidentally released from the 242-A Evaporator, Hanford Site, Richland, Washington

    SciTech Connect

    Daling, P.M.; Lavender, J.C.

    1997-11-01

    Two errors have been identified in the authorization basis for the 242-A Evaporator at the Hanford Site. These errors, which appear in the 242-A Evaporator/Crystallizer Final Safety Analysis Report analysis of ammonia gas concentrations accidentally released from the 242-A Evaporator, are: (1) the vessel ventilation system flow rate used in the previous calculations is a factor of ten higher than the actual flow rate, and (2) the previous calculations did not account for the ammonia source term reduction that would occur via condensation of ammonia vapors, which will remove a large fraction of the ammonia from the exhaust gas stream. The purpose of this document is to correct these errors and recalculate the maximum ground-level concentrations of ammonia released to the environment as a result of potential errors in blending Evaporator feed. The errors offset each other somewhat, so it is unlikely that the 242-A Evaporator has operated outside its current authorization basis. However, the errors must be corrected and the results incorporated into a revision of the 242-A Evaporator/Crystallizer Safety Analysis Report, WHC-SD-WM-SAR-023. An EPA-approved atmospheric dispersion model, SCREEN3, was used to recalculate the maximum ground-level concentrations of ammonia that would be released from the 242-A Evaporator as a result of a feed-blending error. The results of the re-analysis of the 242-A Evaporator`s ammonia release scenario are as follows. The onsite receptor 100 m away from the release point (242-A vessel vent stack) is projected to be exposed to a maximum ground-level concentration of ammonia of 8.3 ppm. The maximally-exposed offsite receptor, located at the nearest Hanford Site boundary 16 km away from the 242-A vessel vent stack, will be exposed to a maximum ground-level concentration of 0.11 ppm ammonia.

  15. Technical support for authorization of 242-A evaporator campaign 97-2, Hanford Site, Richland, Washington

    SciTech Connect

    Daling, P.M.; Lavender, J.C.

    1997-07-01

    An analysis was performed to determine the acceptability of processing 242-A Evaporator/Crystallizer Campaign 97-2 feed. Inhalation unit liter doses (ULDs) were calculated using the methods and data described in the Tank Waste Remediation System Basis for Interim Operation (TWRS BIO) and 242-A Evaporator/Crystallizer Safety Analysis Report. The ULD calculated for the Campaign 97-2 slurry was found to be less than the TWRS BIO evaporator slurry ULD and so would be within the analyzed safety envelope defined in the TWRS BIO. The Evaporator slurry ULD established in the TWRS BIO and supporting documents was calculated using the bounding source strength defined in the 242-A Evaporator SAR. Consequently, the risks and consequences associated with the Campaign 97-2 slurry would be lower than those already accepted by DOE and documented in the TWRS BIO and 242-A Evaporator SAR. The direct radiation exposures from formation of a liquid pool of Campaign 97-2 slurry were demonstrated to be less than the exposures from a pool formed by bounding source strength evaporator slurry as defined in the 242-A Evaporator SAR. This was demonstrated via a comparison of the Campaign 97-2 slurry composition and the 242-A Evaporator SAR bounding source strength. It was concluded that the direct radiation exposures from Campaign 97-2 slurry would be within the analyzed safety envelope in the 242-A Evaporator SAR.

  16. Operation of N Reactor and Fuels Fabrication Facilities, Hanford Reservation, Richland, Benton County, Washington: Environmental assessment

    SciTech Connect

    Not Available

    1980-08-01

    Environmental data, calculations and analyses show no significant adverse radiological or nonradiological impacts from current or projected future operations resulting from N Reactor, Fuels Fabrication and Spent Fuel Storage Facilities. Nonoccupational radiation exposures resulting from 1978 N Reactor operations are summarized and compared to allowable exposure limits.

  17. 300 Area steam plant replacement, Hanford Site, Richland, Washington: Environmental assessment

    SciTech Connect

    1997-03-01

    Steam to support process operations and facility heating is currently produced by a centralized oil-fired plant located in the 300 Area and piped to approximately 26 facilities in the 300 Area. This plant was constructed during the 1940s and, because of tis age, is not efficient, requires a relatively large operating and maintenance staff, and is not reliable. The US Department of Energy is proposing an energy conservation measure for a number of buildings in the 300 Area of the Hanford Site. This action includes replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing new natural gas pipelines to provide a fuel source for many of these units and constructing a central control building to operate and maintain the system. A new steel-sided building would be constructed in the 300 Area in a previously disturbed area at least 400 m (one-quarter mile) from the Columbia River, or an existing 300 Area building would be modified and used. This Environmental Assessment evaluates alternatives to the proposed actions. Alternatives considered are: (1) the no action alternative; (2) use of alternative fuels, such as low-sulfur diesel oil; (3) construction of a new central steam plant, piping and ancillary systems; (4) upgrade of the existing central steam plant and ancillary systems; and (5) alternative routing of the gas distribution pipeline that is a part of the proposed action. A biological survey and culture resource review and survey were also conducted.

  18. 11. Building Layout, 185189 D, U.S. Atomic Energy Commission, Richland ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Building Layout, 185-189 D, U.S. Atomic Energy Commission, Richland Operations Office, Dwg. No. H-1-14844, 1957. - D-Reactor Complex, Deaeration Plant-Refrigeration Buildings, Area 100-D, Richland, Benton County, WA

  19. Washington, DC

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Citizens of the United States vote today (November 7, 2000) to determine who will be the next president and vice president of the country, as well as who will fill a number of congressional and senate seats that are up for election. This image of the U.S. capital city-Washington, D.C.-was acquired on June 1 by the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER), a Japanese sensor flying aboard NASA's Terra spacecraft. The scene encompasses an area 14 km wide by 13.7 km tall, and was made using a combination of ASTER's visible and near-infrared channels. In this image, vegetation appears red, buildings and paved areas appear light blue, and the waters of the Anacostia and Potomac Rivers are dark grey. ASTER's 15-meter spatial resolution allows us to see individual buildings, including the White House, the Jefferson Memorial, and the Washington Monument with its shadow. Image courtesy NASA/GSFC/MITI/ERSDAC/JAROS, and U.S./Japan ASTER Science Team

  20. 76 FR 80408 - Addendum to the Memorandum of Understanding with the Department of Energy (August 28, 1992); Oak...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... Occupational Safety and Health Administration Addendum to the Memorandum of Understanding with the Department..., Occupational Safety and Health Administration (OSHA). ACTION: Addendum to Memorandum of Understanding between... Occupational Safety and Health Administration (TOSHA). SUMMARY: This document is a notice of an addendum to...

  1. A Fisheries Evaluation of the Richland and Wapato Canal Fish Screening Facilities, Spring 1987 : Annual Report.

    SciTech Connect

    Neitzel, Duane A.; Abernethy, C.Scott; Lusty, E.William; Wampler, Sally J.

    1988-02-01

    We evaluated the effectiveness of new fish screening facilities at the Richland and Wapato canals in south-central Washington State. The screen integrity tests at the Richland Screens indicated that 100% of fall chinook salmon fry (Oncorhynchus tshawytscha) released in front of the screens were prevented from entering the canal behind the screens. Our estimate is based on a 61% catch efficiency for control fish planted behind the screens. At the Wapato Canal, we estimated that between 3% and 4% of the test fish were either impinged on the screen surface and passed over the screens or passed through faulty screen seals. Our estimate is based over the screens or passed through faulty screen seals. Our estimate is based on a greater than 90% capture of control fish released in front of the screens. At the Wapato Screens, we estimated that 0.8% of steelhead smolts (Salmo gairdneri) and 1.4% of spring chinook salmon smolts released during low canal flow tests wee descaled. During full canal flow tests, 1.6% of the steelhead and 3.1% of the spring chinook salmon released were descaled. The fish return pipe at the Wapato Canal was tested: the estimate of descaled test fish wa not different from the estimate of descaled control fish. The time required for fish to exit from the Wapato Screen forebay varied with species and with canal flow. During low canal flows, 43.2% of steelhead and 61.6% of spring chinook salmon smolts released at the trash racks were captured in the fish return within 96 hr. 11 refs., 11 figs., 10 tabs.

  2. Annual Energy Consumption Analysis Report for Richland Middle School

    SciTech Connect

    Liu, Bing

    2003-12-18

    Richland Middle School is a single story, 90,000 square feet new school located in Richland, WA. The design team proposed four HVAC system options to serve the building. The proposed HVAC systems are listed as following: (1) 4-pipe fan coil units served by electrical chiller and gas-fired boilers, (2) Ground-source closed water loop heat pumps with water loop heat pumps with boiler and cooling tower, and (3) VAV system served by electrical chiller and gas-fired boiler. This analysis estimates the annual energy consumptions and costs of each system option, in order to provide the design team with a reasonable basis for determining which system is most life-cycle cost effective. eQuest (version 3.37), a computer-based energy simulation program that uses the DOE-2 simulation engine, was used to estimate the annual energy costs.

  3. 76 FR 65512 - Record of Decision Addendum for the Department of Homeland Security Headquarters Consolidation at...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-21

    ... (40 CFR parts 1500-1508), GSA Order PBS P 1095.1F (Environmental considerations in decision-making... ADMINISTRATION Record of Decision Addendum for the Department of Homeland Security Headquarters Consolidation at... Administration (GSA). ACTION: Record of Decision Addendum. SUMMARY: Pursuant to the requirements of the...

  4. 77 FR 35699 - Proposed Information Collection; Request for Public Comment: Addendum to Declaration for Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-14

    ...: Addendum to Declaration for Federal Employment, Child Care and Indian Child Care Worker Positions AGENCY... Collection: Title: Addendum to Declaration for Federal Employment, Child Care and Indian Child Care Worker..., Child Care and Indian Child Care Worker Positions.'' Although there was a change on the form...

  5. Some Thoughts on Stability in Nonlinear Periodic Focusing Systems [Addendum

    DOE R&D Accomplishments Database

    McMillan, Edwin M.

    1968-03-29

    Addendum to September 5, 1967 report with the same title and with the abstract: A brief discussion is given of the long-term stability of particle motions through periodic focusing structures containing lumped nonlinear elements. A method is presented whereby one can specify the nonlinear elements in such a way as to generate a variety of structures in which the motion has long-term stability.

  6. 78 FR 56655 - Foreign-Trade Zone (FTZ) 203-Moses Lake, Washington; Notification of Proposed Production Activity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... Production Activity; AREVA Inc. (Fuel Rod Assemblies); Richland, Washington The Moses Lake Public Corporation... rod assemblies. Pursuant to 15 CFR 400.14(b), FTZ activity would be limited to the specific foreign... that applies to fuel rod assemblies (duty rate--3.3%) for the foreign status inputs noted...

  7. Addendum to the 1996 Gunnison Monitoring Report for the Gunnison, Colorado Wetlands Mitigation Plan

    SciTech Connect

    1997-10-01

    This document is an addendum to the 1996 Gunnison Monitoring Report for the Gunnison, Colorado, Wetlands Mitigation Report, dated July 1997. The purpose of this addendum is to: (1) modify how information on plant height and plant species criteria are presented; and (2) provide more detailed information regarding the evaluation of the bare ground criteria at the Camp Ketle site. The information in this addendum is provided at the request of the Bureau of Land Management to aid in future monitoring and evaluation of the wetland mitigation sites.

  8. Communication Platform Payload Definition (CPPD) study. Volume 3: Addendum

    NASA Technical Reports Server (NTRS)

    Hunter, E. M.; Driggers, T.; Jorasch, R.

    1986-01-01

    This is Volume 3 (Addendum) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study Program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.

  9. Comprehension monitoring program, groundwater, technical plan, version 3.3 (addendum). Final technical report

    SciTech Connect

    1990-09-01

    This addendum details modifications proposed for the CMP groundwater monitoring program. These modifications are based on previous CMP monitoring experience and are directed toward optimizing network efficiencies and maximizing data utility.

  10. SAFETY ANALYSIS REPORT FOR PACKAGING, MODEL 9977, ADDENDUM 3, JUSTIFICATION FOR SMALL GRAM QUANTITY CONTENTS

    SciTech Connect

    Abramczyk, G.

    2011-10-31

    This Addendum establishes a new family of content envelopes consisting of small quantities of radioactive materials. These content envelopes and specific packing configurations are shown to be subcritical. However, the dose rates of some payloads must be measured and shown to comply with applicable radiation limits. Authorization for shipment of the content envelop requires acceptance of this Addendum by the DOE-HQ certifying official as a supplement to the 9977 SARP Revision 2 and DOE-HQ's subsequent revision of the CoC Revision 10 (which is based on SARP Addendum 2 and SARP Addendum 4) to authorize the additional content envelope. The Small Gram Quantity Content Envelopes and packing configurations will be incorporated in the next revision of the 9977 SARP.

  11. Concrete samples for organic samples, data package and 222-S validation summary report. Addendum 1A

    SciTech Connect

    Vogel, R.E.

    1994-11-01

    This document is in two parts: the first is the data package entitled ``Concrete Samples for Organic Samples`` and the second is entitled ``Concrete Samples for Organic Samples -- Addendum 1A`` which is the 222-S validation summary report.

  12. Addendum to Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site

    SciTech Connect

    Bergeron, Marcel P.; Freeman, Eugene J.; Wurstner, Signe K.; Kincaid, Charles T.; Coony, Mike M.; Strenge, Dennis L.; Aaberg, Rosanne L.; Eslinger, Paul W.

    2001-09-28

    This report summarizes efforts to complete an addendum analysis to the first iteration of the Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site (Composite Analysis). This document describes the background and performance objectives of the Composite Analysis and this addendum analysis. The methods used, results, and conclusions for this Addendum analysis are summarized, and recommendations are made for work to be undertaken in anticipation of a second analysis.

  13. Southwest Washington, Urban Renewal Area, Bounded by Independence Avenue, Washington ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Southwest Washington, Urban Renewal Area, Bounded by Independence Avenue, Washington Avenue, South Capitol Street, Canal Street, P Street, Maine Avenue & Washington Channel, Fourteenth Street, D Street, & Twelfth Street, Washington, District of Columbia, DC

  14. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  15. 32 CFR Appendix E to Part 68 - Addendum for Education Services Between [Name of Educational Institution] and the U.S. Navy

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Addendum for Education Services Between and the... DEFENSE PERSONNEL, MILITARY AND CIVILIAN VOLUNTARY EDUCATION PROGRAMS Pt. 68, App. E Appendix E to Part 68—Addendum for Education Services Between and the U.S. Navy 1. Purpose. This addendum is between (Name...

  16. Addendum to the performance assessment analysis for low-level waste disposal in the 200 west area active burial grounds

    SciTech Connect

    Wood, M.I., Westinghouse Hanford

    1996-12-20

    An addendum was completed to the performance assessment (PA) analysis for the active 200 West Area low-level solid waste burial grounds. The addendum includes supplemental information developed during the review of the PA analysis, an ALARA analysis, a comparison of PA results with the Hanford Groundwater Protection Strategy, and a justification for the assumption of 500 year deterrence to the inadvertent intruder.

  17. 78 FR 66040 - 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate-Sales Contract and Addendums

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... Contract and Addendums AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: On October 25, 2013 at 78 FR 64145, HUD inadvertently published a 30 day notice of proposed information collection entitled HUD-Owned Real Estate-Sales Contract and Addendums (2502-0306). HUD will republish...

  18. 75 FR 64309 - Components for Evaluation of Direct-Reading Monitors for Gases and Vapors and Addendum

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    ... HUMAN SERVICES Centers for Disease Control and Prevention Components for Evaluation of Direct-Reading... addendum are entitled, respectively, ``Components for Evaluation of Direct-Reading Monitors for Gases and Vapors'' and ``Addendum to Components for Evaluation of Direct-Reading Monitors for Gases and...

  19. Booker T. Washington Rediscovered

    ERIC Educational Resources Information Center

    Bieze, Michael Scott, Ed.; Gasman, Marybeth, Ed.

    2012-01-01

    Booker T. Washington, a founding father of African American education in the United States, has long been studied, revered, and reviled by scholars and students. Born into slavery, freed and raised in the Reconstruction South, and active in educational reform through the late nineteenth and early twentieth centuries, Washington sought to use…

  20. Human Exploration of Mars Design Reference Architecture 5.0, Addendum #2

    NASA Technical Reports Server (NTRS)

    Drake, Bret G. (Editor); Watts Kevin D. (Editor)

    2014-01-01

    This report serves as the second Addendum to NASA-SP-2009-566, "Human Exploration of Mars Design Reference Architecture 5.0." The data and descriptions contained within this Addendum capture some of the key assessments and studies produced since publication of the original document, predominately covering those conducted from 2009 through 2012. The assessments and studies described herein are for the most part independent stand-alone contributions. Effort has not been made to assimilate the findings to provide an updated integrated strategy. That is a recognized future effort. This report should not be viewed as constituting a formal plan for the human exploration of Mars.

  1. A safety assessment of rotary mode core sampling in flammable gas single shell tanks: Hanford Site, Richland, Washington

    SciTech Connect

    Raymond, R.E.

    1996-04-15

    This safety assessment (SA) addresses each of the required elements associated with the installation, operation, and removal of a rotary-mode core sampling (RMCS) device in flammable-gas single-shell tanks (SSTs). The RMCS operations are needed in order to retrieve waste samples from SSTs with hard layers of waste for which push-mode sampling is not adequate for sampling. In this SA, potential hazards associated with the proposed action were identified and evaluated systematically. Several potential accident cases that could result in radiological or toxicological gas releases were identified and analyzed and their consequences assessed. Administrative controls, procedures and design changes required to eliminate or reduce the potential of hazards were identified. The accidents were analyzed under nine categories, four of which were burn scenarios. In SSTS, burn accidents result in unacceptable consequences because of a potential dome collapse. The accidents in which an aboveground burn propagates into the dome space were shown to be in the ``beyond extremely unlikely`` frequency category. Given the unknown nature of the gas-release behavior in the SSTS, a number of design changes and administrative controls were implemented to achieve these low frequencies. Likewise, drill string fires and dome space fires were shown to be very low frequency accidents by taking credit for the design changes, controls, and available experimental and analytical data. However, a number of Bureau of Mines (BOM) tests must be completed before some of the burn accidents can be dismissed with high confidence. Under the category of waste fires, the possibility of igniting the entrapped gases and the waste itself were analyzed. Experiments are being conducted at the BOM to demonstrate that the drill bit is not capable of igniting the trapped gas in the waste. Laboratory testing and thermal analysis demonstrated that, under normal operating conditions, the drill bit will not create high enough temperatures to initiate a propagating reaction in the waste. However, system failure that coincides in a waste layer with high organic content and low moisture may initiate an exothermic reaction in the waste. Consequently, a conservative approach based on the current state of the knowledge resulted in limiting the drilling process to a subset of the flammable-gas tanks. Accidents from the chemical reactions and criticality category are shown to result in acceptable risk. A number of accidents are shown to potentially result in containment (tank liner) breach below the waste level. Mitigative features are provided for these accidents. Gas-release events without burn also are analyzed, and radiological and toxicological consequences are shown to be within risk guidelines. Finally, the consequences of potential spills are shown to be within the risk guidelines.

  2. Characterization of stored defense production spent nulcear fuel and associated materials at Hanford Site, Richland Washington: Environmental assessment

    SciTech Connect

    1995-03-01

    There are about 2,100 tonnes (2,300 tons) of defense production spent nuclear fuel stored in the 100-K Area Basins located along the south shore of the Columbia River in the northern part of the Hanford Site. Some of the fuel which has been in storage for a number of years is in poor condition and continues to deteriorate. The basins also contain fuel fragments and radioactively contaminated sludge. The DOE needs to characterize defense production spent nuclear fuel and associated materials stored on the Hanford Site. In order to satisfy that need, the Department of Energy (DOE) proposes to select, collect and transport samples of spent nuclear fuel and associated materials to the 327 Building for characterization. As a result of that characterization, modes of interim storage can be determined that would be compatible with the material in its present state and alternative treatment processes could be developed to permit a broader selection of storage modes. Environmental impacts of the proposed action were determined to be limited principally to radiation exposure of workers, which, however, were found to be small. No health effects among workers or the general public would be expected under routine operations. Implementation of the proposed action would not result in any impacts on cultural resources, threatened, endangered and candidate species, air or water quality, socioeconomic conditions, or waste management.

  3. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington. Revision

    SciTech Connect

    Not Available

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium-{sup 99}{Tc}-Nitrate multi-contaminant IRM plume identified beneath U Plant.

  4. Access road from State Route 240 to the 200 West Area, Hanford Site, Richland, Washington: Environmental assessment

    SciTech Connect

    Not Available

    1994-02-01

    The US Department of Energy (DOE) proposes to construct an access road on the Hanford Site, from State Route (SR) 240 to Beloit Avenue in the 200 West Area. Traffic volume during shift changes creates an extremely serious congestion and safety problem on Route 4S from the Wye barricade to the 200 Areas. A Risk Evaluation (Trost 1992) indicated that there is a probability of 1.53 fatal accidents on Route 4S within 2 years. To help alleviate this danger, a new 3.5-kilometer (2.2-mile)-long access road would be constructed from Beloit Avenue in the 200 West Area to SR 240. In addition, administrative controls such as redirecting traffic onto alternate routes would be used to further reduce traffic volume. The proposed access road would provide an alternative travel-to-work route for many outer area personnel, particularly those with destinations in the 200 West Area. This proposal is the most reasonable alternative to reduce the problem. While traffic safety would be greatly improved, a small portion of the shrub-steppe habitat would be disturbed. The DOE would offset any habitat damage by re-vegetation or other appropriate habitat enhancement activities elsewhere on the Hanford Site. This Environmental Assessment (EA) provides information about the environmental impacts of the proposed action, so a decision can be made to either prepare an Environmental Impact Statement or issue a Finding of No Significant Impact.

  5. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  6. An Approach for the Analysis of Regulatory Analytes in High Level Radioactive Waste Stored at Hanford, Richland, Washington

    SciTech Connect

    Wiemers, K.D.; Miller, M.; Lerchen, M.E.

    1999-01-04

    Radiation levels, salt concentration, and the oxidizing nature of the waste dictates modifications to the SW-846 methods. Modified methods will be used to meet target EQLs and QC currently in SW-846. Method modifications will be validated per SW-846 and HASQARD and will be documented consistent with WAC 173-303-910. The affect of modifications to holding times and storage conditions will be evaluated using techniques developed by Maskarinec and Bayne (1996). After validating the methods and performing the holding time study on a minimum of two Phase 1 candidate feed source tank wastes, DOE and Ecology will assess: whether different methods are needed, whether holding time/storage conditions should be altered, whether the high priority analyte list should be refined, and which additional tank waste needs to be characterized.

  7. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

  8. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

  9. Latest inflation model constraints from cosmic microwave background measurements: Addendum

    SciTech Connect

    Kinney, William H.; Kolb, Edward W.; Melchiorri, Alessandro; Riotto, Antonio

    2008-10-15

    In this addendum to Phys. Rev. D 74, 023502 (2006), we present an update of cosmological constraints on single-field inflation in light of the Wilkinson Microwave Ansiotropy Probe satellite mission five-year results (WMAP5). We find that the cosmic microwave background data are quite consistent with a Harrison-Zel'dovich primordial spectrum with no running and zero tensor amplitude. We find that the three main conclusions of our analysis of the WMAP three-year data (WMAP3) are consistent with the WMAP5 data: (1) the Harrison-Zel'dovich model is within the 95% confidence level contours; (2) there is no evidence for running of the spectral index of scalar perturbations; (3) from the WMAP 5 data alone, potentials of the form V{proportional_to}{phi}{sup p} are consistent with the data for p=2 and are ruled out for p=4. Furthermore, consistent with our WMAP3 analysis, we find no evidence for primordial tensor perturbations, this time with a 95% confidence upper limit of r<0.4 for the WMAP5 data alone, and r<0.35 for the WMAP5 data taken in combination with the Arcminute Cosmology Bolometer Array (ACBAR)

  10. The Washington Report.

    ERIC Educational Resources Information Center

    American Indian Journal, 1978

    1978-01-01

    The Washington Report identifies legislation of interest to Indian people, namely the Indian Child Welfare Act of 1977, Navajo/Hopi Relocation Amendments, HR 12860, Supreme Court summaries, and bills which failed in the Congress. (RTS)

  11. Addendum to the Safety Analysis Report for the Steel Waste Packaging. Revision 1

    SciTech Connect

    Crow, S R

    1996-02-15

    The Battelle Pacific Northwest National Laboratory Safety Analysis Report (SAR) for the Steel Waste Package requires additional analyses to support the shipment of remote-handled radioactive waste and special-case waste from the 324 building hot cells to PUREX for interim storage. This addendum provides the analyses required to show that this waste can be safely shipped onsite in the configuration shown.

  12. Day Care Related Federal Programs (An Addendum to Day Care Survey 1970).

    ERIC Educational Resources Information Center

    1971

    This document, an addendum to the Day Care Survey 1970, describes day care-related federal programs. Each program, is described briefly in terms of: the nature of the program, day care services provided, authorizing legislation, the administering agency, and miscellaneous information (funding, recipients, etc.). Types of programs included are: (1)…

  13. Addendum by Race/Ethnicity: National Freshman Attitudes Report, 2012. National Research Study

    ERIC Educational Resources Information Center

    Noel-Levitz, Inc, 2012

    2012-01-01

    Included in this addendum are the findings for the Noel-Levitz 2012 National Freshman Attitudes Report by race/ethnicity for incoming students. These data show the percentage of students within each group that agreed with each item. Also included in this paper are the demographic breakdown of the respondents and a brief explanation of the…

  14. 78 FR 53506 - Agency Information Collection (HUD/VA Addendum to Uniform Residential Loan Application) Activity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ....rennie@va.gov . Please refer to ``OMB Control No. 2900-0144.'' SUPPLEMENTARY INFORMATION: Title: HUD/VA... AFFAIRS Agency Information Collection (HUD/VA Addendum to Uniform Residential Loan Application) Activity... information through www.Regulations.gov , or to Office of Information and Regulatory Affairs, Office...

  15. 75 FR 48413 - Agency Information Collection (HUD/VA Addendum to Uniform Residential Loan Application) Activity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... information through www.Regulations.gov ; or to VA's OMB Desk Officer, OMB Human Resources and Housing Branch..., (202) 461-7485, FAX (202) 273-0443 or e-mail denise.mclamb@va.gov . Please refer to ``OMB Control No... AFFAIRS Agency Information Collection (HUD/VA Addendum to Uniform Residential Loan Application)...

  16. ADDENDUM TO ASSESSMENT OF STYRENE EMISSION CONTROLS FOR FRP/C AND BOAT BUILDING INDUSTRIES

    EPA Science Inventory

    This report is an addendum to a 1996 report, Assessment of Styrene Emission Controls for FRP/C and Boat Building Industries. It presents additional evaluation of the biological treatment of styrene emissions, Dow Chemical Company's Sorbathene solvent vapor recovery system, Occupa...

  17. Addendum to the Calcined Waste Storage at the Idaho Nuclear Technology Center

    SciTech Connect

    M. D. Staiger; Michael Swenson; T. R. Thomas

    2004-05-01

    This report is an addendum to the report Calcined Waste Storage at the Idaho Nuclear Technology and Engineering Center, INEEL/EXT-98-00455 Rev. 1, June 2003. The original report provided a summary description of the Calcined Solids Storage Facilities (CSSFs). It also contained dozens of pages of detailed data tables documenting the volume and composition (chemical content and radionuclide activity) of the calcine stored in the CSSFs and the liquid waste from which the calcine was derived. This addendum report compiles the calcine composition data from the original report. It presents the compiled data in a graphical format with units (weight percent, curies per cubic meter, and nanocuries per gram) that are commonly used in regulatory and waste acceptance criteria documents. The compiled data are easier to use and understand when comparing the composition of the calcine with potential regulatory or waste acceptance criteria. This addendum report also provides detailed explanations for the large variability in the calcine composition among the CSSFs. The calcine composition varies as a result of reprocessing different types of fuel that had different cladding materials. Different chemicals were used to dissolve the various types of fuel, extract the uranium, and calcine the resulting waste. This resulted in calcine with variable compositions. This addendum report also identifies a few trace chemicals and radionuclides for which the accuracy of the amounts estimated to be in the calcine could be improved by making adjustments to the assumptions and methods used in making the estimates.

  18. 46 CFR Appendix IV to Part 390 - Sample Addendum to Maritime Administration Capital Construction Fund Agreement

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Sample Addendum to Maritime Administration Capital Construction Fund Agreement IV Appendix IV to Part 390 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS UNDER PUBLIC LAW 91-469 CAPITAL CONSTRUCTION FUND Pt. 390, App. IV Appendix IV to...

  19. Addendum to Effectiveness of Cognitive Tutor Algebra I at Scale. Working Paper WR-1050-DEIES

    ERIC Educational Resources Information Center

    Pane, John F.; Griffin, Beth Ann; McCaffrey, Daniel F.; Karam, Rita

    2014-01-01

    This addendum to previously published results presents alternative analyses of data from large-scale effectiveness studies of Cognitive Tutor Algebra I in middle schools and high schools. These alternative analyses produce results that are substantively the same as previously reported. We find a significant positive effect of 0.21 standard…

  20. Reference Mission Version 3.0 Addendum to the Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team. Addendum; 3.0

    NASA Technical Reports Server (NTRS)

    Drake, Bret G. (Editor)

    1998-01-01

    This Addendum to the Mars Reference Mission was developed as a companion document to the NASA Special Publication 6107, "Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team." It summarizes changes and updates to the Mars Reference Missions that were developed by the Exploration Office since the final draft of SP 6107 was printed in early 1999. The Reference Mission is a tool used by the exploration community to compare and evaluate approaches to mission and system concepts that could be used for human missions to Mars. It is intended to identify and clarify system drivers, significant sources of cost, performance, risk, and schedule variation. Several alternative scenarios, employing different technical approaches to solving mission and technology challenges, are discussed in this Addendum. Comparing alternative approaches provides the basis for continual improvement to technology investment plan and a general understanding of future human missions to Mars. The Addendum represents a snapshot of work in progress in support of planning for future human exploration missions through May 1998.

  1. 76 FR 51023 - Richland-Stryker Generation LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Richland-Stryker Generation LLC; Supplemental Notice That Initial Market... in the above-referenced proceeding of Richland-Stryker Generation LLC's application for...

  2. Washington's Bold Reformer

    ERIC Educational Resources Information Center

    Schachter, Ron

    2008-01-01

    For more than a year, the debate, press coverage, and buzz in Washington, D.C., have swirled over whether someone so different--and so relatively inexperienced--can deliver sweeping change. And presidential hopeful Barack Obama hasn't been the only one receiving that kind of unrelenting scrutiny. This article describes Michelle Rhee who became…

  3. Indians of Washington State.

    ERIC Educational Resources Information Center

    Washington Office of the State Superintendent of Public Instruction, Olympia.

    Maps, photographs, and illustrations are included in this introductory history of Indians in Washington state. The tribal groups of the area are classified by geographic and cultural region as Coastal, Puget Sound, and Plateau tribes, and the majority of the resource booklet provides information about the history and culture of each group.…

  4. Washington Community Colleges Factbook.

    ERIC Educational Resources Information Center

    Meier, Terre; Story, Sherie

    Detailed information on the 27 state-supported community colleges in Washington is presented in six sections. The first section, containing general information, describes the state system organization, lists the individual colleges, and reviews the roles of state agencies and presents a history of the system. A section on student information…

  5. Washington Community Colleges Factbook.

    ERIC Educational Resources Information Center

    Meier, Terre

    The 109 tables and graphs in this six-chapter factbook present a statistical profile of the Washington Community College System for Fall 1979. Chapter I presents background information on the history and organization of the 27 state-supported colleges. Chapter II outlines data on annual and quarterly enrollments from 1969 through 1979; student…

  6. GIARDIASIS IN WASHINGTON STATE

    EPA Science Inventory

    The objective was to determine the potential for transmission of giardiasis through approved drinking water supplies in Washington State. The project consisted of five studies: the first was conducted during trapping seasons (1976-1979) and resulted in examining of 656 beaver sto...

  7. Washington: Hanford Nuclear Reservation

    Atmospheric Science Data Center

    2014-05-15

    ... clouds in the May 15 image with the same area imaged on August 3. The darkened burn scar measures approximately 35 kilometers across. ... NASA's Jet Propulsion Laboratory, Pasadena, CA, for NASA's Science Mission Directorate, Washington, D.C. The Terra spacecraft is managed ...

  8. Washington School Finance Primer.

    ERIC Educational Resources Information Center

    Washington Office of the State Superintendent of Public Instruction, Olympia.

    The proportion of state funding for public schools in Washington is among the highest in the nation: about 75 percent of school-district General Fund revenue comes from the state. Almost 60 percent of all state General Fund expenditures are for education (about 46 percent for grades K-12 and 12 percent for higher education). The state…

  9. Washington Community College Study.

    ERIC Educational Resources Information Center

    Washington State Board for Community Coll. Education, Olympia.

    The history, administration, and governance of the Washington Community College System (WCCS) are analyzed in this seven-part report prepared for the state legislature. Part I presents background information on the WCCS's role and mission, history, students, programs, personnel, facilities, finances, student costs, and future. Part II discusses…

  10. Washington's Can Do Kids.

    ERIC Educational Resources Information Center

    Washington State Office of Community Development, Olympia.

    Conceived as a state-supported community-sponsored program for families, strengthened by business and service organization support, and designed to work with local educational, child care, and social service agencies, Washington State's Early Childhood Education and Assistance Program (ECEAP, pronounced e-cap) provides a "whole child" preventative…

  11. Addendum 2: Logs of monitor wells drilled May 1988 through December 1992

    SciTech Connect

    Stout, J.; Qualheim, B.; McPherrin, R.; Barber, K.; Hedegaard, R.; McConihe, W.; Miller, T.

    1993-11-01

    The logs in this addendum were plotted in a new format by the same software package (LOGGER by Rockware, Denver, CO) that was used in the original publication. The scale remains the same, 1 inch = 15 foot. The header is totally automated with a subheading indexing the well-construction symbols. Geophysical curves are labeled in their respective channels, and percentage core recovery is plotted in a histogram. Lithologic symbols are plotted to scale in a channel similar to previous logs. The lithologic description also has been automated to assure consistency in terminology. Descriptions are more extensive and are referenced by leader lines to the lithologic symbol. Additional figures included for this Addendum are: a plot of all the monitoring well locations at the LLNL Main site and a plot detailing the gasoline spill area well locations in the vicinity of Building 403.

  12. Addendum to Revision 1 of the Corrective Action Investigation Plan for Corrective Action Unit 98: Frenchman Flat, Nevada Test Site, Nevada (Addendum Revision No. 1)

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office

    2001-06-06

    This document is submitted as an addendum to the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit (CAU) 98: Frenchman Flat, Nevada Test Site (NTS), Nevada. The addendum was prepared to propose work activities in response to comments resulting from the U.S. Department of Energy's (DOE's) review of the draft Frenchman Flat CAU model of groundwater flow and contaminant transport completed in April 1999. The reviewers included an external panel of experts and the Nevada Division of Environmental Protection. As a result of the review, additional work scope, including new data-collection and modeling activities, has been identified for the Frenchman Flat CAU. The proposed work scope described in this addendum will be conducted in accordance with the revised Underground Test Area strategy contained in the December 2000 amendment to the Federal Facility Agreement and Consent Order. The Frenchman Flat CAU model is a group of interdependent models designed to predict the extent of contamination in groundwater due to the underground nuclear tests conducted within this CAU. At the time of the DOE review, the CAU model consisted of a CAU groundwater flow and transport model comprised of two major components: a groundwater flow model and a recharge model. The CAU groundwater flow model is supported by a hydrostratigraphic model and a recharge model, whereas the CAU transport model is supported by a source-term model. As part of the modeling activities proposed in this addendum, two new major components may be added to the Frenchman Flat CAU model: a total-system model and two local groundwater flow and transport models. The reviewers identified several issues relating to insufficiency of data and inadequacy of the modeling process that should be addressed to provide additional confidence in the modeling results with respect to the potential for contaminant migration to the Lower Carbonate Aquifer. The proposed additional work scope includes new data

  13. Recent developments: Washington focus

    SciTech Connect

    1990-12-01

    November was a quiet month in Washington. Although Congress has recessed until 1991, the Senate filled vacancies in party leadership positions created by November`s elections. The House is expected to proceed with its changes in early December. The Nuclear Energy Forum was held in Washington, DC on November 11-14 to discuss the status of the nuclear industry in the USA. The Forum, held in conjunction with the American Nuclear Society`s annual meeting, assembled a large number of CEO`s from US, European, and Far Eastern utilities and vendors. The meeting concluded with an announcement by Philip Bayne, President of NYPA and chairman of the Nuclear Power Oversight Committee (NPOC), of the results of a year-long NPOC study entitled a {open_quotes}Strategic Plan for Building New Nuclear Power Plants.{close_quotes}

  14. Addendum to the MiniBooNE Run Plab. MinneBooNE Physics in 2006

    SciTech Connect

    Aguilar-Arevalo, A. A.

    2004-11-02

    The primary physics goal of Mini BooNE is to confirm or rule out the LSND vμ→ve oscilliation observation with high significance. In the 2003 Run Plan document presented to the PAC, we outlined the need for 1 X 1021 protons on target (POT) to achieve this goal. In this document, we present an addendum to our run plan for fiscal year 2006 (FY2006).

  15. Mariner Mars 1971 television picture catalog: Sequence design and picture coverage, volume 2, addendum 1

    NASA Technical Reports Server (NTRS)

    Koskela, P. E.

    1973-01-01

    This addendum to the Mariner Mars 1971 Television Picture Catalog, Volume 2 (for abstract, see N73-20850) contains data for the Mariner 9 TV pictures taken after Rev 262. Some of the data presented in Volume 2 is brought up to date. The new provisional mapping pole is discussed, and tables provide the latitude and longitude with respect to the new pole, prime meridian, and rotation rate for the centerpoints of all the Mariner 9 TV pictures.

  16. ADDENDUM: The classification of Novikov algebras in low dimensions: invariant bilinear forms

    NASA Astrophysics Data System (ADS)

    Bai, Chengming; Meng, Daoji

    2001-10-01

    In this note, we give a complete classification of the (non-degenerate) symmetric invariant bilinear forms on Novikov algebras in dimension 2 and 3, which can be regarded as an addendum of the classification of Novikov algebras in low dimensions given in our previous work (Bai C M and Meng D J 2001 J. Phys. A: Math. Gen. 34 1581-94).

  17. TATOOSH ROADLESS AREA, WASHINGTON.

    USGS Publications Warehouse

    Evarts, Russell C.

    1984-01-01

    Geologic and geochemical surveys of the Tatoosh Roadless Area in Washington were conducted. The results indicate that none of the four parts comprising the roadless area are likely to contain mineral or energy resources. The geology of this part of the Cascade Range is poorly known, and a regionally focussed program of geologic mapping and geochemical sampling might discover areas of promising mineralization perhaps extending into the roadless area beneath the surface.

  18. Podiatrists Licensed in Washington.

    ERIC Educational Resources Information Center

    Washington State Dept. of Social and Health Services, Olympia. Health Manpower Project.

    This survey, based on a 95 0/0 response rate, determined that of all the podiatrists licensed in the state of Washington, 69 0/0 live within the state, 95 0/0 were actively employed in that profession, and almost all were in private practice. The primary work function of 83 0/0 was direct patient care, and over half of the respondents worked 40 to…

  19. Libby South Fire, Washington

    NASA Technical Reports Server (NTRS)

    2002-01-01

    On July 9, 2001, a fire burned about 15 miles south of Twisp, Washington, that officials believe was caused by human error. NASA's Moderate-resolution Imaging Spectroradiometer on the Terra satellite observed the fire, indicated with a red dot in this image, on July 10, after the fire had already consumed about 1,240 acres. On July 10, another fire-called the Thirty Mile Fire-trapped 21 firefighters and 2 civilians in a narrow canyon in the Chewuch River Valley, north of Winthrop, WA. (That fire did not erupt until later in the day after this image was acquired and is therefore not visible.) Tragically, four firefighters were killed and six people were injured, including the two civilians. Rolling debris, rugged and steep terrain, and limited access are impeding efforts to contain the now 8,200-acre fire, which according to current fire incident reports, is completely uncontained. Nearly all the areas in the full-size image, including Washington (center), Idaho (right), Oregon (bottom) are in a state of severe drought, which means the region could be in for another devastating fire season. Another fire is visible in Idaho in the full-size image just east of where Idaho borders with Washington and Oregon. Image courtesy Jacques Descloitres, MODIS Land Rapid Response Team

  20. Sierra/SolidMechanics 4.22 user's guide : addendum for shock capabilities.

    SciTech Connect

    Not Available

    2011-10-01

    This is an addendum to the Sierra/SolidMechanics 4.22 User's Guide to document additional capabilities that are available for use in the Presto{_}ITAR code that are not available for use in the standard version of Sierra/SolidMechanics (Sierra/SM). Presto{_}ITAR is an enhanced version of Sierra/SM that provides capabilities that make it regulated under the U.S. Department of State's International Traffic in Arms Regulations (ITAR) export-control rules. This code is part of the Vivace product, and is only distributed to entities that comply with ITAR regulations. The enhancements primarily focus on material models that include an energy-dependent pressure response, appropriate for very large deformations and strain rates. Since this is an addendum to the standard Sierra/SolidMechanics User's Guide, please refer to that document first for general descriptions of code capability and use. This addendum documents material models and element features that support energy-dependent material models.

  1. Alternative Energy Saving Technology Analysis Report for Richland High School Renovation Project

    SciTech Connect

    Liu, Bing

    2004-08-09

    On July 8, 2004, L&S Engineering, Inc. submitted a technical assistance request to Pacific Northwest National Laboratory (PNNL) to help estimate the potential energy savings and cost effectiveness of the solar energy and daylighting design alternatives for Richland High School Renovation Project in Richland, WA. L&S Engineering expected PNNL to evaluate the potential energy savings and energy cost savings, the probable installation costs, incentives or grants to reduce the installed costs and simple payback for the following alternative measures: (1) Daylighting in New Gym; (2) Solar Photovoltaics; (3) Solar Domestic Hot Water Pre-Heat; and (4) Solar Outside Air Pre-Heat Following are the findings of the energy savings and cost-effectiveness analysis of above alternative energy saving technologies.

  2. Washington v. Glucksberg.

    PubMed

    1997-06-26

    The U.S. Supreme Court upheld Washington's ban against assisted suicide "as applied to competent, terminally ill adults who wish to hasten their deaths by obtaining medication prescribed by their doctors." The Court refused to expand the liberty interest under the Due Process Clause of the U.S. constitution to include a right to commit suicide under it, a right to assisted suicide. The state has prevailing interests in the preservation of human life, the prevention of suicide, the integrity of the medical profession, the protection of vulnerable groups, and avoidance of a slippery slope into euthanasia. PMID:12041284

  3. Richland Environmental Restoration Project Fiscal Year 2000--2002 Detailed Work Plan -- Surveillance/Maintenance and Transition Project

    SciTech Connect

    Swan, K.N.

    1999-09-29

    The US Department of Energy (DOE), Richland Operations Office (RL), directed Hanford Site contractors to update multi-year work plans in accordance with the guidance provided to them. The Richland Environmental Restoration Project continued the Detailed Work Plan update approach that was approved in fiscal year 1998. This Detailed Work Plan provides the cost, scope, and schedule for the FY00 through FY02 activities required to support the Surveillance/Maintenance and Transition Project.

  4. Interim fiscal profile, Benton and Franklin counties, Washington: Working draft

    SciTech Connect

    Dong, F.B.; Dugan, M.K.; Clark, D.C.

    1988-02-01

    This report presents a fiscal profile of Benton and Franklin counties, and of the cities of Richland, Kennewick, and Pasco. Overall, changes in operating revenues and expenditures in these jurisdictions have corresponded with changes in the local economy. The combined operating expenditures of Benton County, Franklin County, Kennewick, Pasco, and Richland, expressed in current dollars, tripled between 1975 and 1985, increasing from $18.1 million to $55.0 million, an annual average increase of 11.8 percent. During this time, the population of the Benton-Franklin MSA increased from 100,000 to 140,900 people, and the national all-items price index for urban consumers doubled, increasing from 161.2 to 322.2. Adjusted for inflation, per capita expenditures by these governments increased only slightly during this period, from $361.8 in 1975 to $390.3 in 1985. Employment in the Benton-Franklin MSA rose from 40,080 workers in 1970 to a peak of 75,900 in 1981 before declining to 61,100 in 1985, primarily due to the loss of 9,928 jobs in the Washington Public Power Supply System after 1981. The MSA's population followed a similar trend, with a slight lag. In 1970, total population in the Benton-Franklin MSA was 93,356 people. The MSA's population grew rapidly during the late 1970s, reached a peak of 147,900 persons in 1982, and then declined to 139,300 in 1986. 23 refs., 16 figs., 14 tabs.

  5. Early Learning in Washington State

    ERIC Educational Resources Information Center

    Bill & Melinda Gates Foundation, 2011

    2011-01-01

    About 80,000 children enter kindergarten in Washington each year, and many lack basic language and behavioral skills--such as knowing letters and colors, following directions, getting along with others, and exhibiting impulse-control. In 2006, based on the recommendation of the Washington Learns Commission, Governor Christine Gregoire created the…

  6. Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada

    SciTech Connect

    DOE /NV

    2000-05-18

    This document is an addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, DOE/NV-582-Rev. 0. This addendum provides the requested documentation that supports the assertion that contamination above levels of concern does not exist in the abandoned sewer lines. This addendum summarizes the results of the manhole investigation conducted during March 2000. Results of the manhole investigation indicate that no changes to the Corrective Action Decision Document/Closure Report are necessary and all other sections of the document shall remain unchanged.

  7. Addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation

    SciTech Connect

    Not Available

    1994-03-01

    This document is an addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation (DOE 1993). The Department of Energy--Oak Ridge Operations (DOE-ORO) is proposing this addendum to the US Envianmental Protection Agency, Region IV (EPA-IV), and the Tennessee Department of Environment and Conservation (TDEC) as a reduced sampling program on the Clinch River arm of Watts Bar Reservoir and on Poplar Creek. DOE-ORO is proposing to maximize the use of existing data and minimize the collection of new data for water, sediment, and biota during Phase 2 of the Clinch River Remedial Investigation. The existing data along with the additional data collected in Phase 2 would be used to perform a baseline risk assessment and make remedial decisions. DOE-ORO considers that the existing data, the additional data collected in Phase 2, and on-site remedial investigation data would be sufficient to understand the nature and extent of the contamination problem in the Clinch River, perform a baseline risk assessment,and make remedial decisions. This addendum is organized in three sections. The first section provides background information and describes a rationale for modifying the Phase 2 Sampling and Analysis Plan. Section 2 presents a summary of the existing data for the Clinch River arm of Watts Bar Reservoir and an evaluation of the sufficiency of this data for a baseline human health and ecological risk assessment. Section 3 describes the revised Phase 2 Sampling and Analysis Plan for surface water, sediment, and biota in the Clinch River OU and in the Poplar Creek OU.

  8. Documented Safety Analysis Addendum for the Neutron Radiography Reactor Facility Core Conversion

    SciTech Connect

    Boyd D. Christensen

    2009-05-01

    The Neutron Radiography Reactor Facility (NRAD) is a Training, Research, Isotope Production, General Atomics (TRIGA) reactor which was installed in the Idaho National Laboratory (INL) Hot Fuels Examination Facility (HFEF) at the Materials and Fuels Complex (MFC) in the mid 1970s. The facility provides researchers the capability to examine both irradiated and non-irradiated materials in support of reactor fuel and components programs through non-destructive neutron radiography examination. The facility has been used in the past as one facet of a suite of reactor fuels and component examination facilities available to researchers at the INL and throughout the DOE complex. The facility has also served various commercial research activities in addition to the DOE research and development support. The reactor was initially constructed using Fuel Lifetime Improvement Program (FLIP)- type highly enriched uranium (HEU) fuel obtained from the dismantled Puerto Rico Nuclear Center (PRNC) reactor. In accordance with international non-proliferation agreements, the NRAD core will be converted to a low enriched uranium (LEU) fuel and will continue to utilize the PRNC control rods, control rod drives, startup source, and instrument console as was previously used with the HEU core. The existing NRAD Safety Analysis Report (SAR) was created and maintained in the preferred format of the day, combining sections of both DOE-STD-3009 and Nuclear Regulatory Commission Regulatory Guide 1.70. An addendum was developed to cover the refueling and reactor operation with the LEU core. This addendum follows the existing SAR format combining required formats from both the DOE and NRC. This paper discusses the project to successfully write a compliant and approved addendum to the existing safety basis documents.

  9. POTENTIAL USE OF ACTIVATED CARBON TO RECOVER TC-99 FROM 200 WEST AREA GROUNDWATER AS AN ALTERNATIVE TO MORE EXPENSIVE RESINS HANFORD SITE RICHLAND WASNINGTON

    SciTech Connect

    BYRNES ME; ROSSI AJ; TORTOSO AC

    2009-12-03

    Recent treatability testing performed on groundwater at the 200-ZP-1 Operable Unit at the Hanford Site in Richland, Washington, has shown that Purolite{reg_sign} A530E resin very effectively removes Tc-99 from groundwater. However, this resin is expensive and cannot be regenerated. In an effort to find a less expensive method for removing Tc-99 from the groundwater, a literature search was performed. The results indicated that activated carbon may be used to recover technetium (as pertechnetate, TCO{sub 4}{sup -}) from groundwater. Oak Ridge National Laboratory used activated carbon in both batch adsorption and column leaching studies. The adsorption study concluded that activated carbon absorbs TCO{sub 4}{sup -} selectively and effectively over a wide range of pH values and from various dilute electrolyte solutions (< 0.01 molarity). The column leaching studies confirmed a high adsorption capacity and selectivity of activated carbon for TCO{sub 4}{sup -}. Since activated carbon is much less expensive than Purolite A530E resin, it has been determined that a more extensive literature search is warranted to determine if recent studies have reached similar conclusions, and, if so, pilot testing of 200-ZP-1 groundwater wi11 likely be implemented. It is possible that less expensive, activated carbon canisters could be used as pre-filters to remove Tc-99, followed by the use of the more expensive Purolite A530E resin as a polishing step.

  10. Addendum to Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees

    NASA Technical Reports Server (NTRS)

    Holekamp, Kara; Frisbie, Troy; Estep, Lee

    2005-01-01

    In the original report dated February 11, 2005, the utility of NASA Earth science data in the air quality activities of other agencies and organizations was assessed by reviewing strategic and mission plans and by conducting personal interviews with agency experts to identify and investigate agencies with the potential for partnership with NASA. The overarching agency strategic plans were reviewed and commonalities such as the desire for partnerships and technology development were noted. This addendum to the original report contains such information about the Tennessee Valley Authority and will be inserted as Section 2.6 of "Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees."

  11. Addendum to Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees

    NASA Technical Reports Server (NTRS)

    Holekamp, Kara; Frisbie, Troy; Estep, Lee

    2005-01-01

    In the original report dated February 11, 2005, the utility of the NASA Earth science data in the air quality activities of other agencies and organizations was assessed by reviewing strategic and mission plans and by conducting personal interviews with agency experts to identify and investigate agencies with the potential for partnership with NASA. The overarching agency strategic plans were reviewed and commonalities such as the desire for partnerships and technology development were noted. The addendum to the original report contains such information about the Tennessee Valley Authority and will be inserted in Section 2.6 of "Air Quality Decision Support Tools, Partner Plans, Working Groups, Committees".

  12. Addendum to ''Scattering of twisted particles: Extension to wave packets and orbital helicity''

    SciTech Connect

    Ivanov, I. P.; Serbo, V. G.

    2011-12-15

    In a recent work [Phys. Rev. A 84, 033804 (2011)] we considered elastic scattering of a twisted particle from a plane wave and studied how the orbital helicity of the twisted particle changes after scattering. We showed that for realistic beams the relative change can be small, |m{sup '}-m|/m<<1, thus resolving a controversy which existed in the literature. In this Addendum, using a more accurate analysis, we argue that in the kinematics of Compton backscattering a stronger statement is true: in fact m{sup '}{approx_equal}m, and the difference |m{sup '}-m| even by a single unit is already suppressed.

  13. Systems engineering functions and requirements for the Hanford cleanup mission. First issue, Addendum 2

    SciTech Connect

    Holmes, J.J.

    1994-01-01

    This addendum provides the technical detail of a systems engineering functional analysis for the Hanford cleanup mission. Details of the mission analysis including mission statement, scope, problem statement, initial state definition, and final state definition are provided in the parent document. The functional analysis consists of Input Computer Automated Manufacturing Definition (IDEFO) diagrams an definitions, which will be understood by systems engineers, but which may be difficult for others to comprehend. For a more complete explanation of this work, refer to the parent document. The analysis covers the total Hanford cleanup mission including the decomposition levels at which the various Hanford programs or integrated activities are encountered.

  14. ENVIRONMENTAL ASSESSMENT: SOURCE TEST AND EVALUATION REPORT ADDENDUM - LURGI-TYPE MEDIUM-BTU GASIFICATION. VOLUME 2. APPENDIX B

    EPA Science Inventory

    The report is an addendum to a 1981 environmental assessment source test and evaluation report (EPA-600/7-81-142) on Lurgi-type medium-Btu gasification in Kosovo, Yugoslavia. It contains analytical data on 21 gasification plant streams, not included in the final report. Condensab...

  15. Technical Review Report for the Mound 1KW Package Safety Analysis Report for Packaging Addendum No. 1, through Revision b

    SciTech Connect

    DiSabatino, A; West, M; Hafner, R; Russell, E

    2007-10-04

    This Technical Review Report (TRR) documents the review, performed by the Lawrence Livermore National Laboratory (LLNL) staff, at the request of the U.S. Department of Energy (DOE), on the 'Mound 1KW Package Safety Analysis Report for Packaging, Addendum No. 1, Revision b', dated May 2007 (Addendum 1). The Mound 1KW Package is certified by DOE Certificate of Compliance (CoC) number USA/9516/B(U)F-85 for the transportation of Type B quantities of plutonium heat source material. The safety analysis of the package is documented in the 'Safety Analysis Report for Packaging (SARP) for the Mound 1KW Package' (i.e., the Mound 1KW SARP, or the SARP). Addendum 1 incorporates a new fueled capsule assembly payload. The following changes have been made to add this payload: (1) The primary containment vessel (PCV) will be of the same design, but will increase in height to 11.16 in.; (2) A new graphite support block will be added to support up to three fueled capsule assemblies per package; (3) The cutting groove height on the secondary containment vessel (SCV) will be heightened to accommodate the taller PCV; and (4) A 3.38 in. high graphite filler block will be placed on top of the PCV. All other packaging features, as described in the Mound 1KW SARP [3], remain unchanged. This report documents the LLNL review of Addendum 1[1]. The specific review for each SARP Chapter is documented herein.

  16. CAPITAL AND O AND M COST RELATIONSHIPS FOR HAZARDOUS WASTE INCINERATION: ADDENDUM NO. 1 - IONIZING WET SCRUBBER COSTS

    EPA Science Inventory

    This report addresses certain cost aspects of hazardous waste incineration; specifically capital and operating costs for ionizing wet scrubbers (IWS). It is an addendum to a more comprehensive report 'Capital and O&M Cost Relationships for Hazardous Waste Incineration,' which dev...

  17. Addendum to: Implications of the measurements of B{sub s}-B{sub s} mixing on SUSY models

    SciTech Connect

    Ko, P.; Park, Jae-hyeon

    2010-12-01

    This is an addendum to the previous publication, [P. Ko and J.-h. Park, Phys. Rev. D 80, 035019 (2009).]. The semileptonic charge asymmetry in B{sub s} decays is discussed in the context of the general minimal supersymmetric standard model with gluino-mediated flavor and CP violation in light of the recent measurements at the Tevatron.

  18. Addendum to the AAPM's TG-51 protocol for clinical reference dosimetry of high-energy photon beams

    SciTech Connect

    McEwen, Malcolm; DeWerd, Larry; Ibbott, Geoffrey; Followill, David; Rogers, David W. O.; Seltzer, Stephen; Seuntjens, Jan

    2014-04-15

    An addendum to the AAPM's TG-51 protocol for the determination of absorbed dose to water in megavoltage photon beams is presented. This addendum continues the procedure laid out in TG-51 but new k{sub Q} data for photon beams, based on Monte Carlo simulations, are presented and recommendations are given to improve the accuracy and consistency of the protocol's implementation. The components of the uncertainty budget in determining absorbed dose to water at the reference point are introduced and the magnitude of each component discussed. Finally, the consistency of experimental determination of N{sub D,w} coefficients is discussed. It is expected that the implementation of this addendum will be straightforward, assuming that the user is already familiar with TG-51. The changes introduced by this report are generally minor, although new recommendations could result in procedural changes for individual users. It is expected that the effort on the medical physicist's part to implement this addendum will not be significant and could be done as part of the annual linac calibration.

  19. 78 FR 64145 - 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate-Sales Contract and Addendums

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... Contract and Addendums AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD.... Email: OIRA_Submission@omb.eop.gov . FOR FURTHER INFORMATION CONTACT: Colette Pollard, Reports... 20410; email Colette Pollard at Colette.Pollard@hud.gov or telephone 202-402-3400. Persons with...

  20. Wisconsin Educational Technology Plan PreK-12: 2000 Addendum. A Supplement Marking Progress and Extending the Vision.

    ERIC Educational Resources Information Center

    Potter, Calvin; Lohr, Neah J.; Ciske, Stuart J.; Sanders, Stephen N.

    Since the development of the Educational Technology Plan PK-12 in 1996, the state of Wisconsin has made great strides to ensure that the technologies necessary for fostering student growth and achievement are available to urban, suburban, and rural children alike. This addendum, intended to supplement the 1996 plan, will provide Wisconsin's school…

  1. Ethics and the Early Childhood Teacher Educator: A Proposed Addendum to the NAEYC Code of Ethical Conduct.

    ERIC Educational Resources Information Center

    Freeman, Nancy; Feeney, Stephanie; Moravcik, Eva

    2003-01-01

    Proposes an addendum to the National Association for the Education of Young Children's Code of Ethical Conduct concerning the unique ethical challenges facing teacher educators. Presents a conception of professional responsibility in six areas: children and families, adult students, programs hosting practicum students and programs' staffs and…

  2. Effects of Alaska Oil and Natural Gas Provisions of H. R. 4 and S. 1766 on U.S. Energy Markets, Addendum

    EIA Publications

    2002-01-01

    This addendum provides projections on the increase in U.S. oil production from opening the Arctic National Wildlife Refuge, the decease in net petroleum imports, and the change in net petroleum expenditures across a range of cases.

  3. Earth Observing System (EOS)/Advanced Microwave Sounding Unit-A (AMSU-A) Stress Analysis Report, A1 Module. Addendum 1

    NASA Technical Reports Server (NTRS)

    Ely, W.

    1996-01-01

    This addendum reports the structural margins of safety and natural frequency predictions for the design following the EOS AMSU-A1 Mechanical/Structural Subsystem Critical Design Review (CDR), based on a new and more refined finite element model.

  4. Geohydrologic evaluation for the 200 Area Effluent Treatment Facility State-Approved Land Disposal Site: Addendum to WAC 173-240 Engineering Report

    SciTech Connect

    Ballantyne, N.A.

    1993-08-01

    This document provides a geohydrologic evaluation for the disposal of liquid effluent from the 200 Area Effluent Treatment Facility (ETF) at the Hanford Site. This work forms an addendum to the engineering report that supports the completion of the ETF.

  5. UNI Signaling 4.0 Security Addendum: Call for Straw Ballot

    SciTech Connect

    Bullard, C; Tarman, T.D.

    1998-10-01

    The ATM Forum UNI 4.0 Security Addendum has undergone 4 revisions and has been without substantive modifications for 3 ATM Forurn meetings. This contribution is intended to assist the ATM Forum CS Working Group in the process of bringing BTD-CS-UNI-SEC-O1 .04 DIUFT to Straw Ballot. This effort applies equally to its companion documen~ BTD-CS-PNNI-SEC-O 1.02 DRAFT. BTD-CS-UNI-SEC-01 .04 DRAFT is an addendum to UNI 4.0 Signaling that describes the additional procedures needed of ATM signaling to support the signaling-based securily message exchange protocol, and its 4 basic security mechanisms, authentication, confidentiality, integrity and access control for ATM VC/VPs. These services are specified in detail in ATM Forurn document af-sec-0100.000, which is currently in Final Ballot. The remaining identified work for BTD-CS-UNI-SEC-01 .04 DRAFT includes the resolution of the TBD items in the draft, and a review of the sections of the ATM Forum Security Specification V 1.0 af-sec- 0100.000, that are specifically referenced by BTD-CS-UNI-SEC-O 1.04 DRAFT. In support of this effort, this contribution includes the relevant baseline text of the referenced sections of that Security Specification.

  6. Addendum to environmental monitoring plan Nevada Test Site and support facilities

    SciTech Connect

    1992-11-01

    This 1992 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/1 0630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Field Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1992 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

  7. RCRA Facilities Assessment (RFA) Oak Ridge National Laboratory addendum August 25, 1987

    SciTech Connect

    Not Available

    1987-08-01

    The RCRA Facilities Assessment (RFA) report identified approximately 250 Solid Waste Management Units (SWMUs) that were grouped into 20 Waste Area Groupings (WAGs) at Oak Ridge National Laboratory. Identification of each SWMU included information as to location, type, size, dates of operation, type of waste handled, and evidence of releases. Preliminary sampling studies were performed around each WAG to determine if there was evidence of releases beyond its perimeter. Analytical results from the surveys and historical information were the basis for recommendations concerning further actions for each WAG. Remedial investigations (RIs) were recommended for WAGs 1--10 and 17; for WAGs 14, 16, 18, and 20, it was suggested that they be removed from further consideration for remedial action. For the remaining WAGs (11, 12, 13, 15, and 19) the evidence concerning the possible release of contaminants was inconclusive and additional sampling was recommended. The purpose of this Addendum is to report the analytical data obtained from the additional surveys, to make recommendations concerning future remedial actions within these WAGs, and to provide descriptive information for additional sites listed in Table 1.2 of the RFA. Since information concerning the rationale for identifying releases, the sampling survey methodology, and background information for each WAG is presented in the RFA, it is not repeated in this Addendum.

  8. Addendum to the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 134: Aboveground Storage Tanks, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2008-09-01

    The following is an addendum to the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 134: Aboveground Storage Tanks, Nevada Test Site, Nevada, DOE/NV--1275, dated May 2008. This addendum expands upon information provided in the May 2008 plan. It provides specific details regarding samples to be collected at Corrective Action Sites 15-01-05 and 29-01-01. It also provides discussion and rationale for establishing the spatial boundaries of Corrective Action Sites.

  9. Washington: A DC Circuit Tour

    NASA Astrophysics Data System (ADS)

    Halpern, Paul

    2010-12-01

    I explore the history of physics in Washington, D.C., and its environs through a tour of notable sites and personalities. Highlights include visits to the Smithsonian and Carnegie Institutions, stops at the Einstein Memorial, George Washington University, the University of Maryland, and the American Center for Physics, and biographical sketches of physicists Joseph Henry, George Gamow, Edward Teller, and others who worked in the District of Columbia.

  10. Ambient airborne-solids concentrations including volcanic ash at Hanford, Washington sampling sites subsequent to the Mount St. Helens eruption

    SciTech Connect

    Sehmel, G.A.

    1981-06-01

    A major eruption of Mount St. Helens, state of Washington, USA, occurred on May 18, 1980. The resulting volcanic ash plume was transported to the east. The Hanford area, northwest of Richland, Washington, was within the southern edge of the fallout plume. Airborne solid concentrations and airborne particle size distributions were measured at two sites in the Hanford area, a southern and northern site. During the initial sampling day (May 19), the average concentration for respirable particles, < 5.5-..mu..m diameter, was 1430-..mu..g/m/sup 3/ at the southern site; the total collection was 2610-..mu..g/m/sup 3/. The respirable content of the total airborne solids was 55%. At both sites average airborne solid concentrations decreased to 10- to 20-..mu..g/m/sup 3/ in December.

  11. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    SciTech Connect

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  12. Columbia River monitoring: Summary of chemical monitoring along cross sections at Vernita Bridge and Richland

    SciTech Connect

    Dirkes, R.L.; Patton, G.W.; Tiller, B.L.

    1993-05-01

    This report presents the results of the chemical monitoring performed by the Surface Environmental Surveillance Project (SESP) along cross sections of the Columbia River established at Vernita Bridge and the Richland Pumphouse. Potential Hanford-origin chemical constituents of interest were selected based on their presence in ground water near the river, past surveillance efforts that have documented their entry into the river, and reviews of special study reports, CERCIA remedial investigation/feasibility study (RI/FS) documentation, RCRA facility investigation/corrective measure (FI/CW) study plans, and preliminary risk assessments. Results presented in this report include volatile organic compounds, metals, and anions. The data were generated as part of the routine Columbia River monitoring program currently conducted as part of the SESP.

  13. Assessment of low-flow water quality in Richland Creek, Illinois

    USGS Publications Warehouse

    Freeman, W.O.; Schmidt, A.R.

    1986-01-01

    To study the effects of urbanization on water quality, the relations of several stream processes to concentrations of dissolved oxygen and other constituents were evaluated during low-flow periods for a 30.1-mi reach of Richland Creek in southwestern Illinois. The study used both measured data and computer simulations. Reaeration rates and traveltimes were measured at various flow rates using a steady-state, gas-tracer technique. Sediment-oxygen demands were measured at several locations throughout the study reach. Stream discharge, stage, temperature, and chemical-constituent concentrations were measured during two 24-hr periods in July and August 1984. The data were then used to describe water quality and to calibrate and verify the QUAL-II one-dimensional, steady-state, water quality model. (USGS)

  14. 76 FR 37888 - Yellowstone Valley Railroad, L.L.C.-Discontinuance of Service Exemption-in Dawson and Richland...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Yellowstone Valley Railroad, L.L.C.--Discontinuance of Service Exemption--in Dawson and Richland Counties, Mont. Yellowstone Valley Railroad, L.L.C. (YVRR) \\1\\ has filed a...

  15. Addendum 3 to CSAR 80-027, Use of calorimeter 109B for fissile material measurement

    SciTech Connect

    Chiao, T.

    1994-12-05

    This modification to the Plutonium Finishing Plant (PFP) calorimeter system involves removing current calorimeter No. 3 from the water bath and replacing it with a calorimeter that can accommodate larger diameter items (an oversize can). The inside diameters of both the sample and the reference cells will be increased to 5.835 inches at the top opening and to 5.22 inches at the bottom, the 8 inch high measurement zone. This Addendum 3 to Criticality Safety Analysis Report 80-027 examines criticality safety during the use of the modified calorimeter (Calorimeter 109B) with enlarged cell tube diameters to assure that an adequate margin of subcriticality is maintained for all normal and contingency conditions.

  16. Work plan addendum for David Witherspoon, Inc., 901 Site Building Characterization, Knoxville, Tennessee

    SciTech Connect

    1997-01-01

    This building characterization plan was developed as an addendum to the existing site characterization work plan documents, which are in Appendix B of the David Witherspoon, Inc., (DWI) preliminary remedial investigation (RI)/feasibility study (FS). All building characterization activities will be conducted in accordance with the rules of the Hazardous Substance Remedial Action Program under the direction of the Tennessee Department of Environment and Conservation, Division of Superfund (TN Rules 1200-1-3) and its implementing regulations. Additional rules of the state of Tennessee, Comprehensive Environmental Response, Compensation, and Liability Act of 1980, and the U.S. Environmental Protection Agency guidance were consulted during development of this plan. Activities at the DWI site were concerned with scrap metal processing and scrap metal resale.

  17. Design and fabrication of the NASA decoupler pylon for the F-16 aircraft, addendum 1

    NASA Technical Reports Server (NTRS)

    Clayton, J. D.; Haller, R. L.

    1985-01-01

    The results of the final analyses which were conducted using a revised structural simulation of the Decoupler Pylon are reported in this addendum. The simulation incorporates the previously published results of ground tests performed on the flight Decoupler Pylons mounted in a test fixture at General Dynamic's Fort Worth facility. The analyses show that the Decoupler Pylon will suppress wing-store flutter for the GBU-8 flight test stores configuration on an F-16 airplane. The feasibility of carrying a B-61 on the pylons is also investigated with the conclusion that the pylons would need to be modified in order to demonstrate flutter suppression. The results of a ground vibration test performed on the 1/4 scale F-16 flutter model and a wind tunnel test with this model and a model Decoupler Pylon are given.

  18. Addendum to a catalog of low Reynolds number airfoil data for wind turbine applications

    SciTech Connect

    Miley, S.J.

    1985-02-01

    The prediction of wind turbine performance requires airfoil data at Reynolds numbers lower than those used for aircraft operation. A Catalog of Low Reynolds Number Airfoil Data for Wind Turbine Applications, published in 1982 by Rockwell International Corporation, included airfoil data up to a Reynolds number of 3,000,000. After the catalog was finished, it was brought to the author's attention that the cubic spline fitting routine used in generating the curves from discrete data caused inaccuracies in some of the airfoils. A point-to-point curve fitting routing produced more accurate results. This addendum corrects the daag data for the affected airfoils, and is formatted to correlate with the original catalog.

  19. Addendum to ``Scattering of twisted particles: Extension to wave packets and orbital helicity''

    NASA Astrophysics Data System (ADS)

    Ivanov, I. P.; Serbo, V. G.

    2011-12-01

    In a recent work [Phys. Rev. APLRAAN1050-294710.1103/PhysRevA.84.033804 84, 033804 (2011)] we considered elastic scattering of a twisted particle from a plane wave and studied how the orbital helicity of the twisted particle changes after scattering. We showed that for realistic beams the relative change can be small, |m'-m|/m≪1, thus resolving a controversy which existed in the literature. In this Addendum, using a more accurate analysis, we argue that in the kinematics of Compton backscattering a stronger statement is true: in fact m'≈m, and the difference |m'-m| even by a single unit is already suppressed.

  20. Air-quality criteria for lead: Supplement to the 1986 Addendum

    SciTech Connect

    Davis, J.M.; Grant, L.D.

    1990-08-01

    The 1986 U.S. EPA document Air Quality Criteria for Lead (EPA-600/8-83/028 aF-dF) evaluated in detail the latest scientific information concerning sources, routes, and levels of lead (Pb) exposure and associated health effects and potential risks. An Addendum (1986) to that document focuses on additional, newer studies concerning the effects of lead on cardiovascular function and on early physical and neurobehavioral development. The present Supplement to the above materials evaluates further still newer information emerging in the published literature concerning (1) lead effects on blood pressure and other cardiovascular endpoints and (2) the effects of lead exposure during pregnancy or early postnatally on birth outcomes and/or the neonatal physical and neuropsychological development of affected children.

  1. PAT-1 safety analysis report addendum author responses to request for additional information.

    SciTech Connect

    Weiner, Ruth F.; Schmale, David T.; Kalan, Robert J.; Akin, Lili A.; Miller, David Russell; Knorovsky, Gerald Albert; Yoshimura, Richard Hiroyuki; Lopez, Carlos; Harding, David Cameron; Jones, Perry L.; Morrow, Charles W.

    2010-09-01

    The Plutonium Air Transportable Package, Model PAT-1, is certified under Title 10, Code of Federal Regulations Part 71 by the U.S. Nuclear Regulatory Commission (NRC) per Certificate of Compliance (CoC) USA/0361B(U)F-96 (currently Revision 9). The National Nuclear Security Administration (NNSA) submitted SAND Report SAND2009-5822 to NRC that documented the incorporation of plutonium (Pu) metal as a new payload for the PAT-1 package. NRC responded with a Request for Additional Information (RAI), identifying information needed in connection with its review of the application. The purpose of this SAND report is to provide the authors responses to each RAI. SAND Report SAND2010-6106 containing the proposed changes to the Addendum is provided separately.

  2. Work plan addendum for the remedial investigation and feasibility study of the Salmon Site

    SciTech Connect

    1995-11-01

    This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of Energy (DOE) is conducting a focused and phased site characterization as a part, of the RI/FS. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) for evaluating hazardous waste sites on the National Priorities List (NPL). The SS is not listed on the NPL, but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA.

  3. MANHATTAN PROJECT B REACTOR HANFORD WASHINGTON [HANFORD'S HISTORIC B REACTOR (12-PAGE BOOKLET)

    SciTech Connect

    GERBER MS

    2009-04-28

    The Hanford Site began as part of the United States Manhattan Project to research, test and build atomic weapons during World War II. The original 670-square mile Hanford Site, then known as the Hanford Engineer Works, was the last of three top-secret sites constructed in order to produce enriched uranium and plutonium for the world's first nuclear weapons. B Reactor, located about 45 miles northwest of Richland, Washington, is the world's first full-scale nuclear reactor. Not only was B Reactor a first-of-a-kind engineering structure, it was built and fully functional in just 11 months. Eventually, the shoreline of the Columbia River in southeastern Washington State held nine nuclear reactors at the height of Hanford's nuclear defense production during the Cold War era. The B Reactor was shut down in 1968. During the 1980's, the U.S. Department of Energy began removing B Reactor's support facilities. The reactor building, the river pumphouse and the reactor stack are the only facilities that remain. Today, the U.S. Department of Energy (DOE) Richland Operations Office offers escorted public access to B Reactor along a designated tour route. The National Park Service (NPS) is studying preservation and interpretation options for sites associated with the Manhattan Project. A draft is expected in summer 2009. A final report will recommend whether the B Reactor, along with other Manhattan Project facilities, should be preserved, and if so, what roles the DOE, the NPS and community partners will play in preservation and public education. In August 2008, the DOE announced plans to open B Reactor for additional public tours. Potential hazards still exist within the building. However, the approved tour route is safe for visitors and workers. DOE may open additional areas once it can assure public safety by mitigating hazards.

  4. State of Washington Population Trends, 1975. Washington State Information Report.

    ERIC Educational Resources Information Center

    Washington State Office of Program Planning and Fiscal Management, Olympia.

    As of April 1, 1975, Washington's population was estimated at 3,494,124--an increase of 80,874 since 1970. Prepared yearly, this report presents tabular data pertaining to: (1) current April 1 estimates for cities, towns, and counties; (2) current decline in household size; (3) the use of postal vacancy surveys in estimating vacancy rates; and (4)…

  5. State of Washington Population Trends, 1977. Washington State Information Report.

    ERIC Educational Resources Information Center

    Washington State Office of Program Planning and Fiscal Management, Olympia.

    As of April 1, 1977, Washington's population was estimated at 3,661,975--an increase of 248,725 since 1970. Prepared yearly, this report presents data on the official April 1 population estimates for cities, towns, and counties; components of population change; planned population forecasting activities; procedures which help make the housing unit…

  6. Public health assessment for Iron Horse Park, Billerica, Middlesex County, Massachusetts, Region 1. Cerclis No. MAD051787323. Addendum

    SciTech Connect

    1995-01-11

    The initial health assessment and related amendment for Iron Horse Park were completed in December of 1988 and amended in April of 1990 (PB90-136128 and PB92-963707), respectively. These health assessments identified numerous data gaps which were addressed in subsequent investigations released by the United States Environmental Protection Agency (USEPA). Health concerns detailed in this addendum are based on findings of these monitoring activities conducted on or near the Shaffer Landfill at Iron Horse Park.

  7. Environmental assessment: Solid waste retrieval complex, enhanced radioactive and mixed waste storage facility, infrastructure upgrades, and central waste support complex, Hanford Site, Richland, Washington

    SciTech Connect

    1995-09-01

    The U.S. Department of Energy (DOE) needs to take action to: retrieve transuranic (TRU) waste because interim storage waste containers have exceeded their 20-year design life and could fail causing a radioactive release to the environment provide storage capacity for retrieved and newly generated TRU, Greater-than-Category 3 (GTC3), and mixed waste before treatment and/or shipment to the Waste Isolation Pilot Project (WIPP); and upgrade the infrastructure network in the 200 West Area to enhance operational efficiencies and reduce the cost of operating the Solid Waste Operations Complex. This proposed action would initiate the retrieval activities (Retrieval) from Trench 4C-T04 in the 200 West Area including the construction of support facilities necessary to carry out the retrieval operations. In addition, the proposed action includes the construction and operation of a facility (Enhanced Radioactive Mixed Waste Storage Facility) in the 200 West Area to store newly generated and the retrieved waste while it awaits shipment to a final disposal site. Also, Infrastructure Upgrades and a Central Waste Support Complex are necessary to support the Hanford Site`s centralized waste management area in the 200 West Area. The proposed action also includes mitigation for the loss of priority shrub-steppe habitat resulting from construction. The estimated total cost of the proposed action is $66 million.

  8. Report on the emergency response to the event on May 14, 1997, at the plutonuim reclamation facility, Hanford Site, Richland,Washington

    SciTech Connect

    Shoop, D.S.

    1997-08-20

    On the evening of May 14,1997, a chemical explosion Occurred at the Plutonium Reclamation Facility (PRF) in the 200 West Area(200-W) of the Hanford Site. The event warranted the declaration of an Alert emergency, activation of the Hanford Emergency Response Organization (BRO), and notification of offsite agencies. As a result of the emergency declaration, a subsequent evaluation was conducted to assess: 9 the performance of the emergency response organization o the occupational health response related to emergency activities o event notifications to offsite and environmental agencies. Additionally, the evaluation was designed to: 9 document the chronology of emergency and occupational health responses and environmental notifications connected with the explosion at the facility 0 assess the adequacy of the Hanford Site emergency preparedness activities; response readiness; and emergency management actions, occupational health, and environmental actions 0 provide an analysis of the causes of the deficiencies and weaknesses in the preparedness and response system that have been identified in the evaluation of the response a assign organizational responsibility to correct deficiencies and weaknesses a improve future performance 0 adjust elements of emergency implementing procedures and emergency preparedness activities.

  9. Structural acceptance criteria for the evaulation of existing double-shell waste storage tanks located at the Hanford site, Richland, Washington

    SciTech Connect

    Julyk, L.J.; Day, A.D.; Dyrness, A.D.; Moore, C.J.; Peterson, W.S.; Scott, M.A.; Shrivastava, H.P.; Sholman, J.S.; Watts, T.N.

    1995-09-01

    The structural acceptance criteria contained herein for the evaluation of existing underground double-shell waste storage tanks located at the Hanford Site is part of the Life Management/Aging Management Program of the Tank Waste Remediation System. The purpose of the overall life management program is to ensure that confinement of the waste is maintained over the required service life of the tanks. Characterization of the present condition of the tanks, understanding and characterization of potential degradation mechanisms, and development of tank structural acceptance criteria based on previous service and projected use are prerequisites to assessing tank integrity, to projecting the length of tank service, and to developing and applying prudent fixes or repairs. The criteria provided herein summarize the requirements for the analysis and structural qualification of the existing double-shell tanks for continued operation. Code reconciliation issues and material degradation under aging conditions are addressed. Although the criteria were developed for double-shell tanks, many of the provisions are equally applicable to single-shell tanks. However, the criteria do not apply to the evaluation of tank appurtenances and buried piping.

  10. An Assessment of the Stability and the Potential for In-Situ Synthesis of Regulated Organic Compounds in High Level Radioactive Waste Stored at Hanford, Richland, Washington

    SciTech Connect

    Wiemers, K.D.; Babad, H.; Hallen, R.T.; Jackson, L.P.; Lerchen, M.E.

    1999-01-04

    The stability assessment examined 269 non-detected regulated compounds, first seeking literature references of the stability of the compounds, then evaluating each compound based upon the presence of functional groups using professional judgment. Compounds that could potentially survive for significant periods in the tanks (>1 year) were designated as stable. Most of the functional groups associated with the regulated organic compounds were considered unstable under tank waste conditions. The general exceptions with respect to functional group stability are some simple substituted aromatic and polycyclic aromatic compounds that resist oxidation and the multiple substituted aliphatic and aromatic halides that hydrolyze or dehydrohalogenate slowly under tank waste conditions. One-hundred and eighty-one (181) regulated, organic compounds were determined as likely unstable in the tank waste environment.

  11. Project IEP: Washington State Report.

    ERIC Educational Resources Information Center

    Lewis, Linda M.

    The document reports the Washington component of Project IEP (individualized education program), a project designed to identify and clarify perceptions related to roles in the IEP process as mandated by P.L. 94-142, the Education for All Handicapped Children Act. It is explained that under Project IEP approximately 200 persons (including state and…

  12. Coccidioidomycosis acquired in Washington State.

    PubMed

    Marsden-Haug, Nicola; Goldoft, Marcia; Ralston, Cindy; Limaye, Ajit P; Chua, Jimmy; Hill, Heather; Jecha, Larry; Thompson, George R; Chiller, Tom

    2013-03-01

    Clinical, laboratory, and epidemiologic evidence suggest that 3 individuals with acute coccidioidomycosis were exposed in Washington State, significantly beyond previously identified endemic areas. Given the patients' lack of recent travel, coccidioidomycosis was not suspected, leading to delays in diagnosis and appropriate therapy. Clinicians should be aware of this possibility and consider the diagnosis. PMID:23223598

  13. Teaching the March on Washington

    ERIC Educational Resources Information Center

    Jones, William P.; Euchner, Charles; Hill, Norman; Hill, Velma Murphy

    2013-01-01

    One of the most historical events in American history, the non-violent protest "March on Washington," August 28, 1963, is detailed in an article of remembrance by William P. Jones. His article is crowned by highlights from the "I Have a Dream" speech by Dr. Martin Luther King, Jr., but also highlights the lessor known role…

  14. Washington State 1995 Data Book.

    ERIC Educational Resources Information Center

    Washington State Office of Financial Management, Olympia.

    This document is intended to present, in tables and graphs, a diversity of information on Washington State, its people, economy, and government. The information was obtained from state and federal agencies and from private businesses. The data are organized into 11 major chapters which cover the following topics (sample subtopics in parentheses):…

  15. Washington Education Association Directory, 2000.

    ERIC Educational Resources Information Center

    Council for Advancement and Support of Education, Washington, DC.

    This directory presents profiles of 73 higher education associations located in the Washington, DC (and northern Virginia) area. Preliminary information includes an alphabetical list of the associations by full name and an alphabetical list by organizational acronym. Each profile includes the organization's address, telephone numbers, e-mail and…

  16. Washington State's Student Achievement Initiative

    ERIC Educational Resources Information Center

    Pettitt, Maureen; Prince, David

    2010-01-01

    This article describes Washington State's Student Achievement Initiative, an accountability system implemented in 2005-06 that measures students' gains in college readiness, college credits earned, and degree or certificate completion. The goal of the initiative is to increase educational attainment by focusing on the critical momentum points…

  17. Washington Tsunami Hazard Mitigation Program

    NASA Astrophysics Data System (ADS)

    Walsh, T. J.; Schelling, J.

    2012-12-01

    Washington State has participated in the National Tsunami Hazard Mitigation Program (NTHMP) since its inception in 1995. We have participated in the tsunami inundation hazard mapping, evacuation planning, education, and outreach efforts that generally characterize the NTHMP efforts. We have also investigated hazards of significant interest to the Pacific Northwest. The hazard from locally generated earthquakes on the Cascadia subduction zone, which threatens tsunami inundation in less than hour following a magnitude 9 earthquake, creates special problems for low-lying accretionary shoreforms in Washington, such as the spits of Long Beach and Ocean Shores, where high ground is not accessible within the limited time available for evacuation. To ameliorate this problem, we convened a panel of the Applied Technology Council to develop guidelines for construction of facilities for vertical evacuation from tsunamis, published as FEMA 646, now incorporated in the International Building Code as Appendix M. We followed this with a program called Project Safe Haven (http://www.facebook.com/ProjectSafeHaven) to site such facilities along the Washington coast in appropriate locations and appropriate designs to blend with the local communities, as chosen by the citizens. This has now been completed for the entire outer coast of Washington. In conjunction with this effort, we have evaluated the potential for earthquake-induced ground failures in and near tsunami hazard zones to help develop cost estimates for these structures and to establish appropriate tsunami evacuation routes and evacuation assembly areas that are likely to to be available after a major subduction zone earthquake. We intend to continue these geotechnical evaluations for all tsunami hazard zones in Washington.

  18. 12 CFR 4.4 - Washington office.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Washington office. 4.4 Section 4.4 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY ORGANIZATION AND FUNCTIONS, AVAILABILITY... EXAMINERS Organization and Functions § 4.4 Washington office. The Washington office of the OCC is the...

  19. 33 CFR 117.1049 - Lake Washington.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Lake Washington. 117.1049 Section 117.1049 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Washington § 117.1049 Lake Washington. The draw of...

  20. 33 CFR 117.1049 - Lake Washington.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lake Washington. 117.1049 Section 117.1049 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Washington § 117.1049 Lake Washington. The draw of...

  1. 75 FR 20776 - Security Zone; Potomac River, Washington Channel, Washington, DC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... SECURITY Coast Guard 33 CFR Part 165 RIN 1625-AA87 Security Zone; Potomac River, Washington Channel... establishing a temporary security zone in certain waters of Washington Channel on the Potomac River. The... (NPRM) entitled ``Security Zone; Potomac River, Washington Channel, Washington, DC'' in the...

  2. Inspection of surveillance equipment and activities at DOE Field Office, Richland

    SciTech Connect

    Not Available

    1991-09-30

    The purpose of this inspection was to review surveillance activities by the Department of Energy's (DOE) Field Office, Richland (RL) and contractor employees at the RL Hanford site for efficiency and economy and compliance with laws and regulations. The scope included surveillance activities, procedures, training, types of surveillance equipment, and management controls over the equipment and activities. We also looked at Departmental policies and procedures regarding the equipment and activities. Allegations of illegal surveillance that came to our attention during the course of this inspection were referred to the Department of Justice. As part of our review, inspectors were on-site at RL from February 11, 1991, through March 1, 1991. Follow-up trips to RL were also made in April, May, and June 1991. We also conducted interviews at Albuquerque, Savannah River, and Germantown of former RL employees and RL contractors who were on travel. Officials from DOE's Office of General Counsel (OGC), Office of Security Affairs, and Office of Safeguards and Security (S S) were also interviewed regarding the Department's purchase and possession of wiretapping and eavesdropping devices. We obtained 75 signed sworn statements from 55 individuals during the course of the inspection. 1 fig., 1 tab.

  3. Tsunami Preparedness in Washington (video)

    USGS Publications Warehouse

    2010-01-01

    Tsunamis are a constant threat to the coasts of our world. Although tsunamis are infrequent along the West coast of the United States, it is possible and necessary to prepare for potential tsunami hazards to minimize loss of life and property. Community awareness programs are important, as they strive to create an informed society by providing education and training. This video about tsunami preparedness in Washington distinguishes between a local tsunami and a distant event and focus on the specific needs of this region. It offers guidelines for correct tsunami response and community preparedness from local emergency managers, first-responders, and leading experts on tsunami hazards and warnings, who have been working on ways of making the tsunami affected regions safer for the people and communities on a long-term basis. This video was produced by the US Geological Survey (USGS) in cooperation with Washington Emergency Management Division (EMD) and with funding by the National Tsunami Hazard Mitigation Program.

  4. INTERIOR VIEW, WATERSIDE MALL Southwest Washington, Urban Renewal Area, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR VIEW, WATERSIDE MALL - Southwest Washington, Urban Renewal Area, Bounded by Independence Avenue, Washington Avenue, South Capitol Street, Canal Street, P Street, Maine Avenue & Washington Channel, Fourteenth Street, D Street, & Twelfth Street, Washington, District of Columbia, DC

  5. CLOSE VIEW ALONG WATERFRONT TO SHOW BULKHEAD Southwest Washington, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CLOSE VIEW ALONG WATERFRONT TO SHOW BULKHEAD - Southwest Washington, Urban Renewal Area, Bounded by Independence Avenue, Washington Avenue, South Capitol Street, Canal Street, P Street, Maine Avenue & Washington Channel, Fourteenth Street, D Street, & Twelfth Street, Washington, District of Columbia, DC

  6. VIEW OF THE REAR OF WATERSIDE MALL Southwest Washington, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF THE REAR OF WATERSIDE MALL - Southwest Washington, Urban Renewal Area, Bounded by Independence Avenue, Washington Avenue, South Capitol Street, Canal Street, P Street, Maine Avenue & Washington Channel, Fourteenth Street, D Street, & Twelfth Street, Washington, District of Columbia, DC

  7. Father Secchi Goes to Washington

    NASA Astrophysics Data System (ADS)

    McCarthy, M. F.

    1994-12-01

    In 1848 a small group of Jesuit refugees arrived at Georgetown College near Washington, D.C. Among them was a young priest, Angelo Secchi, who had finished theology studies in Rome, but had not been able to complete his final examinations. This done successfully, Secchi turned to astronomy and the new facilities of the Georgetown College Observatory, directed by its founder, Fr. James Curley. During his two years in Washington, Secchi studied physics, wrote an article on Electrical Rheometry for the Smithsonian Institution, and formed a friendship with Matthew Fontaine Maury of the U.S. Navy, who headed the Chart Service and in 1844 was named superintendent of the National Observatory. This was later named the U.S. Naval Observatory. Secchi's friendships formed during the Washington visit proved most helpful for relations between European astronomers and U.S. colleagues. Secchi, after his return to Rome constructed the Observatory of the Collegio Romano atop the baroque Church of St. Ignatius in Rome and began his work in spectral classification of stars.

  8. Addendum to the Closure Report for Corrective Action Unit 329: Area 22 Desert Rock Airstrip Fuel Spill, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    Laura A. Pastor

    2005-03-01

    The following is an addendum to the ''Closure Report for Corrective Action Unit 329: Area 22 Desert Rock Airstrip Fuel Spill, Nevada Test Site, Nevada'', DOE/NV-641. This new information is based on the results of post-closure monitoring data that was not available at the time DOE/NV--641 was issued. This addendum replaces: Section 4.0, ''Closure Verification Results,'' in its entirety; renumbers Section 5.0, ''References'' to Section 6.0, ''References''; and introduces a new Section 5.0, ''Conclusions and Recommendations.'' The list of acronyms and references only contains additions to the original document.

  9. Reservoir characterization of the Mississippian Ratcliffe, Richland County, Montana, Williston Basin. Topical report, September 1997

    SciTech Connect

    Sippel, M.; Luff, K.D.; Hendricks, M.L.

    1998-07-01

    This topical report is a compilation of characterizations by different disciplines of the Mississippian Ratcliffe in portions of Richland County, MT. Goals of the report are to increase understanding of the reservoir rocks, oil-in-place, heterogeneity and methods for improved recovery. The report covers investigations of geology, petrography, reservoir engineering and seismic. The Ratcliffe is a low permeability oil reservoir which appears to be developed across much of the study area and occurs across much of the Williston Basin. The reservoir has not been a primary drilling target in the study area because average reserves have been insufficient to payout the cost of drilling and completion despite the application of hydraulic fracture stimulation. Oil trapping does not appear to be structurally controlled. For the Ratcliffe to be a viable drilling objective, methods need to be developed for (1) targeting better reservoir development and (2) better completions. A geological model is presented for targeting areas with greater potential for commercial reserves in the Ratcliffe. This model can be best utilized with the aid of 3D seismic. A 3D seismic survey was acquired and is used to demonstrate a methodology for targeting the Ratcliffe. Other data obtained during the project include oriented core, special formation-imaging log, pressure transient measurements and oil PVT. Although re-entry horizontal drilling was unsuccessfully tested, this completion technology should improve the economic viability of the Ratcliffe. Reservoir simulation of horizontal completions with productivity of three times that of a vertical well suggested two or three horizontal wells in a 258-ha (640-acre) area could recover sufficient reserves for profitable drilling.

  10. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    SciTech Connect

    Not Available

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  11. Validation of the French version of the Pittsburgh Sleep Quality Index Addendum for posttraumatic stress disorder

    PubMed Central

    Ait-Aoudia, Malik; Levy, Pierre P.; Bui, Eric; Insana, Salvatore; de Fouchier, Capucine; Germain, Anne; Jehel, Louis

    2013-01-01

    Background Sleep disturbances are one of the main complaints of patients with trauma-related disorders. The original Pittsburgh Sleep Quality Index Addendum for PTSD (PSQI-A) is self-report instrument developed to evaluate posttraumatic stress disorder (PTSD)-specific sleep disturbances in trauma-exposed individuals. However, to date, the PSQI-A has not yet been translated nor validated in French. Objective The present study aims to: a) translate the PSQI-A into French, and b) examine its psychometric properties. Method Seventy-three adult patients (mean age=40.3 [SD=15.0], 75% females) evaluated in a specialized psychotraumatology unit completed the French versions of the PSQI-A, Pittsburgh Sleep Quality Index (PSQI), Hospital Anxiety and Depression Scale (HADS), and Impact Event Scale-Revised (IES-R). Results The French version of the PSQI-A showed satisfactory internal consistency, inter-item correlations, item correlations with the total score, convergent validity with PTSD and anxiety measures, and divergent validity with a depression measure. Conclusion Our findings support the use of the French version of the PSQI-A for both clinical care and research. The French version of the PSQI-A is an important addition to the currently available instruments that can be used to examine trauma-related sleep disturbances among French-speaking individuals. PMID:24044071

  12. View of southeastern Washington State

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A vertical view of southeastern Washington States as photographed from Earth orbit by one of the six lenses of the Itek-furnished S190-A Multispectral Photographic Facility Experiment aboard the Skylab space station. The Snake River flows into the Columbia River in the most southerly corner of the picture. The Wallula Lake is below the junction of the two rivers. The Yakima Valley is at the southwestern edge of the photograph. The Columbia Basin is in the center of the picture. The Cascade Range extends across the northwest corner of the photograph.

  13. Addendum to Gamma-Ray Astrophysics: New Insight Into the Universe Second Edition (RP1386 - October 1997)

    NASA Technical Reports Server (NTRS)

    Fichtel, Carl E.; Trombka, Jacob I.

    1999-01-01

    We have been encouraged by the positive reactions that we have received to the second edition of the publication Gamma-Ray Astrophysics, New Insight into the Universe, and therefore, wish to make a few additions. In this addendum there are three small parts: A. Comments on New Findings since October 1997, B. Figures, and C. Corrections. In part B, some of the figures that were in the book have been reproduced here in larger form so that they are easier to read. In part C, the corrections that have come to our attention since the original publication are included.

  14. Addendum to the Closure Report for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada

    SciTech Connect

    2013-07-31

    This addendum to the Closure Report for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, DOE/NV--1480, dated July 2012, documents repairs of erosion and construction of engineered erosion protection features at Corrective Action Site (CAS) 02-37-02 (MULLET) and CAS 09-99-06 (PLAYER). The final as-built drawings are included in Appendix A, and photographs of field work are included in Appendix B. Field work was completed on March 11, 2013.

  15. NASA satellite communications application research, phase 2 addendum. Efficient high power, solid state amplifier for EHF communications

    NASA Technical Reports Server (NTRS)

    Benet, James

    1994-01-01

    This document is an addendum to the NASA Satellite Communications Application Research (SCAR) Phase 2 Final Report, 'Efficient High Power, Solid State Amplifier for EHF Communications.' This report describes the work performed from 1 August 1993 to 11 March 1994, under contract number NASW-4513. During this reporting period an array of transistor amplifiers was repaired by replacing all MMIC amplifier chips. The amplifier array was then tested using three different feedhorn configurations. Descriptions, procedures, and results of this testing are presented in this report, and conclusions are drawn based on the test results obtained.

  16. Reproduction, mortality, and heavy metal concentrations in great blue herons from three colonies in Washington and Idaho

    USGS Publications Warehouse

    Blus, L.J.; Henny, C.J.; Anderson, A.; Fitzner, R.E.

    1985-01-01

    We collected eggs in nests, hatchlings and eggs with advanced embryos on the ground, and prefledgling young of Great Blue Herons (Ardea herodias) at three nesting colonies in Washington and Idaho. Intact fish were also collected on the ground at the Idaho colony. The Ft. Lewis colony near Puget Sound in Washington and the Lake Chatcolet colony in northern Idaho were located near areas extensively polluted with heavy metals from minning or smelting activities. The Hanford Reservation colony near Richland, Washington was located some distance from point sources of heavy metal pollution. Heavy metals in heron samples were generally low and were all below concentrations known to induce mortality or adversely affect reproductive success. The elevated copper in one of three prefledglings from Ft. Lewis paralleled that found in an occasional nestling of several species of birds in other studies; the significance of this relationship is unclear. Breeding herons apparently fed near their colonies in areas removed from the sites of heaviest contamination, but birds in the Lake Chatcolet colony were preying on fish containing as much as 6 mu-g/g lead.

  17. Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal

    SciTech Connect

    Not Available

    1994-01-01

    This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices.

  18. Washington: a guide to geothermal energy development

    SciTech Connect

    Bloomquist, R.G.; Basescu, N.; Higbee, C.; Justus, D.; Simpson, S.

    1980-06-01

    Washington's geothermal potential is discussed. The following topics are covered: exploration, drilling, utilization, legal and institutional setting, and economic factors of direct use projects. (MHR)

  19. ENVIRONMENTAL ASSESSMENT: SOURCE TEST AND EVALUATION REPORT ADDENDUM - LURGI-TYPE MEDIUM-BTU GASIFICATION. VOLUME 1. TECHNICAL REPORT AND APPENDIX A

    EPA Science Inventory

    The report is an addendum to a 1981 environmental assessment source test and evaluation report (EPA-600/7-81-142) on Lurgi-type medium-Btu gasification in Kosovo, Yugoslavia. It contains analytical data on 21 gasification plant streams, not included in the final report. Condensab...

  20. 32 CFR Appendix C to Part 68 - Addendum for Education Services Between [Name of Educational Institution] and the U.S. Army

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Addendum for Education Services Between and the U.S. Army C Appendix C to Part 68 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE PERSONNEL, MILITARY AND CIVILIAN VOLUNTARY EDUCATION PROGRAMS Pt. 68, App. C Appendix C to Part...

  1. Note: Derivation of two-photon circular dichroism—Addendum to “Two-photon circular dichroism” [J. Chem. Phys. 62, 1006 (1975)

    SciTech Connect

    Friese, Daniel H.

    2015-09-07

    This addendum shows the detailed derivation of the fundamental equations for two-photon circular dichroism which are given in a very condensed form in the original publication [I. Tinoco, J. Chem. Phys. 62, 1006 (1975)]. In addition, some minor errors are corrected and some of the derivations in the original publication are commented.

  2. Revised Evaluation of Health Effects Associated with Carbon Monoxide Exposure: An Addendum to the 1979 U.S. EPA Air Quality Criteria Document for Carbon Monoxide (1984)

    EPA Science Inventory

    The addendum re-evaluates the scientific data base concerning health effects associated with exposure to carbon monoxide (CO) at ambient or near ambient levels by providing: (1) a concise summary of key health effects information pertaining to relatively low-level CO exposure; an...

  3. CSAR 79-034 ADDENDUM 2, storing the man-basket in the process cell in 236-Z Building, Plutonium Finishing Plant/Plutonium Reclamation Facility

    SciTech Connect

    Chiao, T.

    1994-10-25

    The man-basket is stored in the Plutonium Reclamation Facility canyon area and this addendum reports on a technical evaluation for the storage inside the canyon to ensure consistency with the requirements of the Nuclear Criticality Safety Manual, WHC-CM-4-29.

  4. Addendum to "Increasing Early Childhood Educators' Use of Communication-Facilitating and Language-Modelling Strategies: Brief Speech and Language Therapy Training"

    ERIC Educational Resources Information Center

    McDonald, David; Proctor, Penny; Gill, Wendy; Heaven, Sue; Marr, Jane; Young, Jane

    2015-01-01

    The purpose of this addendum is to include within our discussion the findings of Girolametto et al. (2007), a randomized controlled trial of Teacher Talk training, an adapted version of Learning Language and Loving It (LLLI) (Weitzman and Greenberg, 2002). Teacher Talk does not include the coaching and video feedback elements of LLLI. Girolametto…

  5. 32 CFR Appendix D to Part 68 - Addendum for Education Services Between [Name of Educational Institution] and the U.S. Marine Corps

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... Grades shall be submitted through the Navy College Management Information System grade entry application... 32 National Defense 1 2014-07-01 2014-07-01 false Addendum for Education Services Between and the... SECRETARY OF DEFENSE PERSONNEL, MILITARY AND CIVILIAN VOLUNTARY EDUCATION PROGRAMS Pt. 68, App. D Appendix...

  6. Flavonoid Values for USDA Survey Foods and Beverages 2007-2008: Provisional Flavonoid Addendum, FNDDS 4.1 and Flavonoid Intake Data, WWEIA, NHANES 2007-2008

    Technology Transfer Automated Retrieval System (TEKTRAN)

    This release of the Flavonoid Values for Survey Foods and Beverages 2007-2008 makes possible, for the first time, calculation of flavonoid intakes based on all foods and beverages reported in national surveys. This release has two components. The first component is an addendum to USDA’s Food and N...

  7. Booker T. Washington and George Washington Carver: A Tandem of Adult Educators at Tuskegee.

    ERIC Educational Resources Information Center

    McGee, Leo

    1984-01-01

    Shows how Booker T. Washington and George Washington Carver espoused adult education principles through their efforts to eradicate illiteracy, teach practical knowledge to Black farmers and poor Blacks, and instill the value of education in Black adults. (SK)

  8. Contributors to Adult Education: Booker T. Washington, George Washington Carver, Alain L. Locke, and Ambrose Caliver.

    ERIC Educational Resources Information Center

    Gyant, LaVerne

    1988-01-01

    Outlines the lives and the contributions to adult education made by the following African American educators: (1) Booker T. Washington; (2) George Washington Carver; (3) Alain L. Locke; and (4) Ambrose Caliver. (BJV)

  9. Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Patrick Matthews and Christy Sloop

    2012-01-01

    This document constitutes an addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters, Nevada Test Site, Nevada (Revision 0), April 2011.

  10. Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee

    SciTech Connect

    SAIC

    2011-04-01

    The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.