Science.gov

Sample records for savannah river production

  1. Food production and consumption near the Savannah River Site

    SciTech Connect

    Hamby, D.M.

    1991-01-01

    Routine operations at the Savannah River Site (SRS) result in the release of radionuclides to the atmosphere and to the Savannah River. The resulting radiological doses to the off-site maximum individual and the 80-km population are estimated on a yearly basis. These estimates are generated using dose models prescribed in the NRC Reg. Guide 1.109 for the commercial nuclear power industry. A study of land and water usage characteristics in the region of the Savannah River Site has been conducted to determine site-specific values of the NRC dose model parameters. The study's scope included local characteristics of meat, milk, vegetable production; Savannah River recreational activities and fish harvests; meat, milk, vegetable, and seafood consumption rates; and Savannah River drinking-water populations. Average and maximum consumption rates of beef, milk, vegetables, and fish have been determined for individuals residing in the southern United States. The study suggest that many of the consumption rates provided by the NRC may not be appropriate for residents of the South. Average consumption rates are slightly higher than the defaults provided by the NRC. Maximum consumption rates, however, are typically lower than NRC values. Agricultural productivity in the SRS region was found to be quite different than NRC recommendations. Off-site doses have been predicted using both NRC and SRS parameter values to demonstrate the significance of site-specific data.

  2. Food production and consumption near the Savannah River Site

    SciTech Connect

    Hamby, D.M.

    1991-12-31

    Routine operations at the Savannah River Site (SRS) result in the release of radionuclides to the atmosphere and to the Savannah River. The resulting radiological doses to the off-site maximum individual and the 80-km population are estimated on a yearly basis. These estimates are generated using dose models prescribed in the NRC Reg. Guide 1.109 for the commercial nuclear power industry. A study of land and water usage characteristics in the region of the Savannah River Site has been conducted to determine site-specific values of the NRC dose model parameters. The study`s scope included local characteristics of meat, milk, vegetable production; Savannah River recreational activities and fish harvests; meat, milk, vegetable, and seafood consumption rates; and Savannah River drinking-water populations. Average and maximum consumption rates of beef, milk, vegetables, and fish have been determined for individuals residing in the southern United States. The study suggest that many of the consumption rates provided by the NRC may not be appropriate for residents of the South. Average consumption rates are slightly higher than the defaults provided by the NRC. Maximum consumption rates, however, are typically lower than NRC values. Agricultural productivity in the SRS region was found to be quite different than NRC recommendations. Off-site doses have been predicted using both NRC and SRS parameter values to demonstrate the significance of site-specific data.

  3. Westinghouse independent safety review of Savannah River production reactors

    SciTech Connect

    Leggett, W.D.; McShane, W.J. ); Liparulo, N.J.; McAdoo, J.D.; Strawbridge, L.E. . Nuclear and Advanced Technology Div.); Toto, G. . Nuclear Services Div.); Fauske, H.K. ); Call, D.W. (Westinghouse Savannah R

    1989-04-01

    Westinghouse Electric Corporation has performed a safety assessment of the Savannah River production reactors (K,L, and P) as requested by the US Department of Energy. This assessment was performed between November 1, 1988, and April 1, 1989, under the transition contract for the Westinghouse Savannah River Company's preparations to succeed E.I. du Pont de Nemours Company as the US Department of Energy contractor for the Savannah River Project. The reviewers were drawn from several Westinghouse nuclear energy organizations, embody a combination of commercial and government reactor experience, and have backgrounds covering the range of technologies relevant to assessing nuclear safety. The report presents the rationale from which the overall judgment was drawn and the basis for the committee's opinion on the phased restart strategy proposed by E.I. du Pont de Nemours Company, Westinghouse, and the US Department of Energy-Savannah River. The committee concluded that it could recommend restart of one reactor at partial power upon completion of a list of recommended upgrades both to systems and their supporting analyses and after demonstration that the organization had assimilated the massive changes it will have undergone.

  4. Savannah River Site production reactor technical specifications. K Production Reactor

    SciTech Connect

    1996-02-01

    These technical specifications are explicit restrictions on the operation of the Savannah River Site K Production Reactor. They are designed to preserve the validity of the plant safety analysis by ensuring that the plant is operated within the required conditions bounded by the analysis, and with the operable equipment that is assumed to mitigate the consequences of an accident. Technical specifications preserve the primary success path relied upon to detect and respond to accidents. This report describes requirements on thermal-hydraulic limits; limiting conditions for operation and surveillance for the reactor, power distribution control, instrumentation, process water system, emergency cooling and emergency shutdown systems, confinement systems, plant systems, electrical systems, components handling, and special test exceptions; design features; and administrative controls.

  5. Savannah River Laboratory monthly report, July 1991

    SciTech Connect

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  6. Savannah River Laboratory monthly report, July 1991

    SciTech Connect

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  7. Savannah River Laboratory monthly report, October 1991

    SciTech Connect

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separations operations; environmental concerns; and waste management. (FI)

  8. Savannah River Laboratory monthly report, October 1991

    SciTech Connect

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separations operations; environmental concerns; and waste management. (FI)

  9. Savannah River Laboratory monthly report, August 1991

    SciTech Connect

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  10. Savannah River Laboratory monthly report, August 1991

    SciTech Connect

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  11. Savannah River Laboratory monthly report, November 1991

    SciTech Connect

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  12. Savannah River Laboratory monthly report, November 1991

    SciTech Connect

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  13. Savannah River Laboratory monthly report, September 1991

    SciTech Connect

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  14. Savannah River Laboratory monthly report, September 1991

    SciTech Connect

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  15. PERFORMANCE OF THE SAVANNAH RIVER SITE COULOMETER FOR NEPTUNIUM PROCESSACCOUNTABILITY AND NEPTUNIUM OXIDE PRODUCT CHARACTERIZATION

    SciTech Connect

    Holland, M; Patterson Nuessle, P; Sheldon Nichols, S; Joe Cordaro, J; George Reeves, G

    2008-06-04

    The Savannah River Site's (SRS) H-Area B-Line (HB-Line) nuclear facility is processing neptunium solutions for stabilization as an oxide. The oxide will eventually be reprocessed and fabricated into target material and the 237Np irradiated to produce {sup 238}Pu in support of National Aeronautics and Space Administration space program missions. As part of nuclear materials accountability, solution concentrations were measured using a high-precision controlled-potential coulometer developed and manufactured at the SRS for plutonium accountability measurements. The Savannah River Site Coulometer system and measurement methodology for plutonium meets performance standards in ISO 12183-2005, 'Controlled-Potential Coulometric Assay of Plutonium'. The Department of Energy (DOE) does not produce or supply a neptunium metal certified reference material, which makes qualifying a measurement method and determining accuracy and precision difficult. Testing and performance of the Savannah River Site Coulometer indicates that it can be used to measure neptunium process solutions and dissolved neptunium oxide without purification for material control and accountability purposes. Savannah River Site's Material Control and Accountability organization has accepted the method uncertainty for accountability and product characterization measurements.

  16. Savannah River Site Robotics

    ScienceCinema

    None

    2012-06-14

    Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

  17. Savannah River Site Robotics

    SciTech Connect

    2010-01-01

    Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

  18. Geologic setting of the New Production Reactor within the Savannah River Site

    SciTech Connect

    Price, V.; Fallaw, W.C.; McKinney, J.B.

    1991-12-31

    The geology and hydrology of the reference New Production Reactor (NPR) site at Savannah River Site (SRS) have been summarized using the available information from the NPR site and areas adjacent to the site, particularly the away from reactor spent fuel storage site (AFR site). Lithologic and geophysical logs from wells drilled near the NPR site do not indicate any faults in the upper several hundred feet of the Coastal Plain sediments. However, the Pen Branch Fault is located about 1 mile south of the site and extends into the upper 100 ft of the Coastal Plain sequence. Subsurface voids, resulting from the dissolution of calcareous portions of the sediments, may be present within 200 ft of the surface at the NPR site. The water table is located within 30 to 70 ft of the surface. The NPR site is located on a groundwater divide, and groundwater flow for the shallowest hydraulic zones is predominantly toward local streams. Groundwater flow in deeper Tertiary sediments is north to Upper Three Runs Creek or west to the Savannah River Swamp. Groundwater flow in the Cretaceous sediments is west to the Savannah River.

  19. Pu-238 production at the Savannah River Plant

    SciTech Connect

    Roggenkamp, P.L.

    1987-11-01

    Pu-238 production capability at SRP is dependent on the availability of Np-237 feed material. With continuing operation of three production reactors at SRP, production of 46 kg Pu-238 per year can be sustained. Capacity of auxiliary facilities is adequate to support the production rates.

  20. Assessment of activation products in the Savannah River Site environment

    SciTech Connect

    Carlton, W.H.; Denham, M.

    1996-07-01

    This document assesses the impact of radioactive activation products released from SRS facilities since the first reactor became operational late in 1953. The isotopes reported here are those whose release resulted in the highest dose to people living near SRS: {sup 32}P, {sup 51}Cr, {sup 60}C, and {sup 65}Zn. Release pathways, emission control features, and annual releases to the aqueous and atmospheric environments are discussed. No single incident has resulted in a major acute release of activation products to the environment. The releases were the result of normal operations of the reactors and separations facilities. Releases declined over the years as better controls were established and production was reduced. The overall radiological impact of SRS activation product atmospheric releases from 1954 through 1994 on the offsite maximally exposed individual can be characterized by a total dose of 0.76 mrem. During the same period, such an individual received a total dose of 14,400 mrem from non-SRS sources of ionizing radiation present in the environment. SRS activation product aqueous releases between 1954 and 1994 resulted in a total dose of 54 mrem to the offsite maximally exposed individual. The impact of SRS activation product releases on offsite populations also has been evaluated.

  1. TRAC loss-of-coolant accident analyses of the Savannah River production reactors

    SciTech Connect

    Lime, J.F.; Motley, F.E. )

    1990-06-01

    TRAC loss-of-coolant accident (LOCA) analyses were performed as part of the independent safety review of the US Department of Energy's Savannah River (SR) production reactors. The double-ended guillotine break in a coolant loop is a design-basis LOCA for the SR reactors. Three break locations were analyzed to determine the worst break location: (1) at the pump-suction flange; (2) at the pump discharge flange; or (3) at the plenum inlet. The plenum-inlet break was shown to be the most severe in terms of minimum flow delivered to each fuel assembly in the reactor core.

  2. Savannah River Site Environmental Report for 1997

    SciTech Connect

    Arnett, M.W.; Mamatey, A.R.

    1998-08-01

    The mission at the Savannah River Site has changed from the production of nuclear weapons materials for national defense to the management of waste, restoration of the environment, and the development of industry in and around the site.

  3. Site selection modeling system for a production facility at Savannah River site

    SciTech Connect

    Shedrow, C.B.; Shedrow, D.M.

    1996-12-31

    The Savannah River site (SRS) is located along the Savannah River in southwestern South Carolina and encompasses an area of {approximately}832 km (198 344 acres). Major land covers include evergreen and deciduous forests, surface water, wetlands, and administrative/industrial areas. Less than 10% of the site`s surface area is developed. Several endangered and threatened species are found on the SRS, including the red-cockaded woodpecker, the southern bald eagle, the wood stork, and the smooth purple coneflower. With the cessation of the Cold War, the traditional defense-related missions at the SRS have been significantly reduced. The implementation of new missions at the SRS will require the utilization of effective siting and prioritization methodologies to ensure the best use of available land resources and protection of the environment. The objective of this paper is to describe the utilization of the Site Selection Modeling System (SSMS) for the selection of potential industrial development sites within the SRS. The SSMS is a raster geographic information system (GIS)-based system that integrates the graphical interface ArcView 2.1 with the GRID modeling functionality of ARC/INFO. The proposed industrial development being sited is a linear accelerator, which will be used for the accelerator production of tritium.

  4. Local and Regional Economic Benefits from Forest Products Production Activities at the Savannah River Site: 1955-Present

    SciTech Connect

    Teeter, L.; Blake, J.I.

    2002-01-01

    SRS was established in 1951 as a nuclear materials production facility; however, decline in the defense mission budget at SRS has created a major economic impact on the community in the Central Savannah River Area. SRS has been offsetting these effects by producing revenue (80 million dollars to date) from the sale of forest products since 1955 primarily trees, but also pine straw. Revenue has been re-invested into the infrastructure development, restoration and management of natural resources. Total asset value of the forest-land has increased from 21 million to over 500 million dollars in the same period.

  5. Remote sensing at Savannah River

    SciTech Connect

    Corey, J.C.

    1986-01-01

    The paper discusses remote sensing systems used at the Savannah River Plant. They include three ground-based systems: ground penetrating radar, sniffers, and lasers; and four airborne systems: multispectral photography, lasers, thermal imaging, and radar systems. (ACR)

  6. Useful characteristics of the Savannah River

    SciTech Connect

    Watts, J R

    1982-05-19

    The following information about the Savannah River is tabulated: significant activities and discharges along the Savannah River, river water temperature data near Jackson st Savannah River Plant, flow informatiom, and reservoir parameters for Clarks Hill, Richard B. Russell and Hartwell reservoirs.

  7. Knowledges and abilities catalog for nuclear power plant operators: Savannah River Site (SRS) production reactors

    SciTech Connect

    Not Available

    1990-06-20

    The Knowledges and Abilities Catalog for Nuclear Power Plant Operations: Savannah River Site (SRS) Production Reactors, provides the basis for the development of content-valid certification examinations for Senior Reactor Operators (SROs) and Central Control Room Supervisors (SUP). The position of Shift Technical Engineer (STE) has been included in the catalog for completeness. This new SRS reactor operating shift crew position is held by an individual holding a CCR Supervisor Certification who has received special engineering and technical training. Also, the STE has a Bachelor of Science degree in engineering or a related technical field. The SRS catalog contains approximately 2500 knowledge and ability (K/A) statements for SROs and SUPs at heavy water moderated production reactors. Each K/A statement has been rated for its importance to the safe operation of the plant in a manner ensuring the health and safety of the public. The SRS K/A catalog is presently organized into five major sections: Plant Systems grouped by Safety Function, Plant Wide Generic K/As, Emergency Plant Evolutions, Theory and Components (to be developed).

  8. Radioiodine in the Savannah River Site environment

    SciTech Connect

    Kantelo, M.V.; Bauer, L.R.; Marter, W.L.; Murphy, C.E. Jr.; Zeigler, C.C.

    1993-01-15

    Radioiodine, which is the collective term for all radioactive isotopes of the element iodine, is formed at the Savannah River Site (SRS) principally as a by-product of nuclear reactor operations. Part of the radioiodine is released to the environment during reactor and reprocessing operations at the site. The purpose of this report is to provide an introduction to radioiodine production and disposition, its status in the environment, and the radiation dose and health risks as a consequence of its release to the environment around the Savannah River Plant. A rigorous dose reconstruction study is to be completed by thee Center for Disease Control during the 1990s.

  9. Savannah River Site (SRS) environmental overview

    SciTech Connect

    O'Rear, M.G. ); Steele, J.L.; Kitchen, B.G. )

    1990-01-01

    The environmental surveillance activities at and in the vicinity of the Savannah River Site (SRS) (formerly the Savannah River Plant (SRP)) comprise one of the most comprehensive and extensive environmental monitoring programs in the United States. This overview contains monitoring data from routine and nonroutine radiological and nonradiological environmental surveillance activities, summaries of environmental protection programs in progress, a summary of National Environmental Policy Act (NEPA) activities, and a listing of environmental permits (Appendix A) issued by regulatory agencies. This overview provides information about the impact of SRS operations on the public and the environment. The SRS occupies a large area of approximately 300 square miles along the Savannah River, principally in Aiken and Barnwell counties of South Carolina. SRS's primary function is the production of tritium, plutonium, and other special nuclear materials for national defense, for other governmental uses, and for some civilian purposes. From August 1950 to March 31, 1989, SRS was operated for the Department of Energy (DOE) by E. I. du Pont de Nemours Co. On April 1, 1989 the Westinghouse Savannah River Company assumed responsibility as the prime contractor for the Savannah River Site.

  10. Groundwater modeling of the proposed new production reactor site, Savannah River Site, South Carolina

    SciTech Connect

    Looney, B.B.; Haselow, J.S.; Andersen, P.F.; Spalding, C.P.; Davis, D.H.

    1990-01-05

    This report addresses groundwater modeling performed to support the Environmental Impact Statement (EIS) that is being prepared by the Department of Energy (DOE). The EIS pertains to construction and operation of a new production reactor (NPR) that is under consideration for the Savannah River Site (SRS). Three primary issues are addressed by the modeling analysis: (1) groundwater availability, (2) changes in vertical hydraulic gradients as a result of groundwater pumpage, and (3) migration of potential contaminants from the NPR site. The modeling indicates that the maximum pumpage to be used, 1000 gpm, will induce only minor drawdown across SRS. Pumpage of this magnitude will have a limited effect on the upward gradient from the Cretaceous into the Tertiary near Upper Three Runs Creek. Potentiometric surface maps generated from modeled results indicate that horizontal flow in the water table is either towards Four Mile Creek to the north or to Pen Branch on the south. Particle tracking analysis indicates that the primary flow paths are vertical into the Lower Tertiary Zone, with very little lateral migration. Total travel times from the NPR site to the edge of the model (approximately 3 miles) is on the order of 50 years. The flow direction of water in the Lower Tertiary Zone is relatively well defined due to the regional extent of the flow system. The Pen Branch Fault does not influence contaminant migration for this particular site because it is in the opposite direction of Lower Tertiary Zone groundwater flow. 20 refs., 27 figs., 2 tabs.

  11. 33 CFR 117.936 - Savannah River.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Savannah River. 117.936 Section... DRAWBRIDGE OPERATION REGULATIONS Specific Requirements South Carolina § 117.936 Savannah River. See § 117.371, Savannah River, listed under Georgia....

  12. 33 CFR 117.936 - Savannah River.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Savannah River. 117.936 Section... DRAWBRIDGE OPERATION REGULATIONS Specific Requirements South Carolina § 117.936 Savannah River. See § 117.371, Savannah River, listed under Georgia....

  13. 33 CFR 117.936 - Savannah River.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Savannah River. 117.936 Section 117.936 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements South Carolina § 117.936 Savannah River. See § 117.371, Savannah River, listed under...

  14. 33 CFR 117.936 - Savannah River.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Savannah River. 117.936 Section... DRAWBRIDGE OPERATION REGULATIONS Specific Requirements South Carolina § 117.936 Savannah River. See § 117.371, Savannah River, listed under Georgia....

  15. 33 CFR 117.936 - Savannah River.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Savannah River. 117.936 Section... DRAWBRIDGE OPERATION REGULATIONS Specific Requirements South Carolina § 117.936 Savannah River. See § 117.371, Savannah River, listed under Georgia....

  16. Sensitivity studies of loss-of-coolant accidents in the Savannah River production reactors

    SciTech Connect

    Edwards, J.N.; Motley, F.E.; Morgan, M.M.; Knight, T.D.; Fischer, S.R. )

    1990-01-01

    Loss-of-coolant accident (LOCA) analyses were completed using the Transient Reactor Analysis Code (TRAC) to support the U.S. Department of Energy efforts to restart the production reactors located at the Savannah River Site. The break location and pump operation after the LOCA were the parameters varied for these sensitivity studies. Three location of double-ended guillotine break were studied: plenum inlet, pump suction, and pump discharge. Three pump operation scenarios were also studied: continued operation of both ac and dc pumps, tripping of the ac motor at 2 s after the LOCA, and tripping of the ac motor at 200 s after the LOCA. The production reactors use low pressure and temperature heavy water as the process fluid. The reactor has a moderator tank that contains the fuel channels. Above the moderator tank is an upper plenum that distributes the heavy water to each fuel assembly. The heavy water flows down through the fuel channels and into the moderator tank. From the tank, the water is pumped back to the upper plenum through six loops. Each loop contains a pump and two heat exchangers. Four of the loops have an emergency core coolant system (ECCS) connection. This TRAC model has been benchmarked extensively against data taken in the actual reactors or in prototypical models of the components of the reactors. The calculations were completed using a version of TRAC-PF1/MOD 2 that was updated to include heavy water properties and other changes that are specific to the production reactors.

  17. Radioactive effluents in Savannah River

    SciTech Connect

    Winn, W.G.

    1991-11-27

    During 1990, low-level radiometric studies of the Savannah River continued to distinguish between effluent contributions from Plant Vogtle and the Savannah River Site. Measurements of these radioactive effluents are of mutual interest to both institutions, as they can address disturbing trends before they become health and legal concerns. The Environmental Technology Section (ETS) has conducted radiometric studies of Plant Vogtle since late 1986, prior to its startup. The plant has two 1100 MWe pressurized water reactors developed by Westinghouse. Unit 1 started commercial operations in June 1987, and Unit 2 began in May 1989. During powered operations, ETS has routinely detected neutron-activated isotopes in controlled releases but all activities have been several orders of magnitude below the DOE guide values. In 1990, processing improvements for Vogtle effluents have yielded even lower activities in the river. The Vogtle release data and the ETS measurements have tracked well over the past four years.

  18. Relative yields of U-235 fission products measured in a high level radioactive sludge at Savannah River Site

    SciTech Connect

    Bibler, N.E.; Coleman, C.J. ); Kinard, W.F. . Dept. of Chemistry)

    1992-01-01

    This paper presents measurements of the concentrations of 42 of the long-lived U-235 fission products in a high-level radioactive waste sludge stored at Savannah River Site. The 42 fision products make up 98% of the waste sludge. We used inductively coupled plasma-mass spectroscopy for the analysis. The relative yields for most of the fission products are in complete agreement with the known relative yields for the beta decay chains of the two asymmetric branches of the slow neutron fission of U-235. Disagreements can be reconciled based on the chemistry of the fission products in the caustic waste sludges, the neutron fluences in SRS reactors, or interferences in the ICP-MS analyses. This paper presents measurements of the concentrations of 42 (98%) of the long-lived U-235 fission products in a high-level radioactive waste sludge stored at the Savannah River Site. We analyzed the sludge with inductively coupled plasma-mass spectroscopy. The relative yields for most of the fission products agree completely with the known relative vields for the beta decay chains of the two asymmetric: branches of the slow neutron fission of U-235. The chemistry of the fission products in the caustic waste sludges, the neutron fluences in SRS reactors, or interferences in the ICP-MS analyses explain the differences in the measured and calculated results.

  19. Relative yields of U-235 fission products measured in a high level radioactive sludge at Savannah River Site

    SciTech Connect

    Bibler, N.E.; Coleman, C.J.; Kinard, W.F.

    1992-10-01

    This paper presents measurements of the concentrations of 42 of the long-lived U-235 fission products in a high-level radioactive waste sludge stored at Savannah River Site. The 42 fision products make up 98% of the waste sludge. We used inductively coupled plasma-mass spectroscopy for the analysis. The relative yields for most of the fission products are in complete agreement with the known relative yields for the beta decay chains of the two asymmetric branches of the slow neutron fission of U-235. Disagreements can be reconciled based on the chemistry of the fission products in the caustic waste sludges, the neutron fluences in SRS reactors, or interferences in the ICP-MS analyses. This paper presents measurements of the concentrations of 42 (98%) of the long-lived U-235 fission products in a high-level radioactive waste sludge stored at the Savannah River Site. We analyzed the sludge with inductively coupled plasma-mass spectroscopy. The relative yields for most of the fission products agree completely with the known relative vields for the beta decay chains of the two asymmetric: branches of the slow neutron fission of U-235. The chemistry of the fission products in the caustic waste sludges, the neutron fluences in SRS reactors, or interferences in the ICP-MS analyses explain the differences in the measured and calculated results.

  20. Savannah River Plant/Savannah River Laboratory radiation exposure report

    SciTech Connect

    Rogers, C.D.; Hyman, S.D.; Keisler, L.L. and Co., Aiken, SC . Savannah River Plant); Reeder, D.F.; Jolly, L.; Spoerner, M.T.; Schramm, G.R. and Co., Aiken, SC . Savannah River Lab.)

    1989-01-01

    The protection of worker health and safety is of paramount concern at the Savannah River Site. Since the site is one of the largest nuclear sites in the nation, radiation safety is a key element in the protection program. This report is a compendium of the results in 1988 of the programs at the Savannah River Plant and the Savannah River Laboratory to protect the radiological health of employees. By any measure, the radiation protection performance at this site in 1988 was the best since the beginning of operations. This accomplishment was made possible by the commitment and support at all levels of the organizations to reduce radiation exposures to ALARA (As Low As Reasonably Achievable). The report provides detailed information about the radiation doses received by departments and work groups within these organizations. It also includes exposure data for recent years to allow Plant and Laboratory units to track the effectiveness of their ALARA efforts. Many of the successful practices and methods that reduced radiation exposure are described. A new goal for personnel contamination cases has been established for 1989. Only through continual and innovative efforts to minimize exposures can the goals be met. The radiation protection goals for 1989 and previous years are included in the report. 27 figs., 58 tabs.

  1. Lock 1 (Savannah River Lock), Elevation of North Wall, Detail ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Lock 1 (Savannah River Lock), Elevation of North Wall, Detail of Wall Foundation, Detail of Gate Pocket - Savannah & Ogeechee Barge Canal, Between Ogeechee & Savannah Rivers, Savannah, Chatham County, GA

  2. Savannah River Site computing architecture

    SciTech Connect

    Not Available

    1991-03-29

    A computing architecture is a framework for making decisions about the implementation of computer technology and the supporting infrastructure. Because of the size, diversity, and amount of resources dedicated to computing at the Savannah River Site (SRS), there must be an overall strategic plan that can be followed by the thousands of site personnel who make decisions daily that directly affect the SRS computing environment and impact the site`s production and business systems. This plan must address the following requirements: There must be SRS-wide standards for procurement or development of computing systems (hardware and software). The site computing organizations must develop systems that end users find easy to use. Systems must be put in place to support the primary function of site information workers. The developers of computer systems must be given tools that automate and speed up the development of information systems and applications based on computer technology. This document describes a proposal for a site-wide computing architecture that addresses the above requirements. In summary, this architecture is standards-based data-driven, and workstation-oriented with larger systems being utilized for the delivery of needed information to users in a client-server relationship.

  3. Savannah River Site computing architecture

    SciTech Connect

    Not Available

    1991-03-29

    A computing architecture is a framework for making decisions about the implementation of computer technology and the supporting infrastructure. Because of the size, diversity, and amount of resources dedicated to computing at the Savannah River Site (SRS), there must be an overall strategic plan that can be followed by the thousands of site personnel who make decisions daily that directly affect the SRS computing environment and impact the site's production and business systems. This plan must address the following requirements: There must be SRS-wide standards for procurement or development of computing systems (hardware and software). The site computing organizations must develop systems that end users find easy to use. Systems must be put in place to support the primary function of site information workers. The developers of computer systems must be given tools that automate and speed up the development of information systems and applications based on computer technology. This document describes a proposal for a site-wide computing architecture that addresses the above requirements. In summary, this architecture is standards-based data-driven, and workstation-oriented with larger systems being utilized for the delivery of needed information to users in a client-server relationship.

  4. Savannah River Site Environmental Report for 1998

    SciTech Connect

    Arnett, M

    1999-06-09

    The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

  5. 33 CFR 80.715 - Savannah River.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Savannah River. 80.715 Section 80.715 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY INTERNATIONAL NAVIGATION RULES COLREGS DEMARCATION LINES Seventh District § 80.715 Savannah River. A line drawn from...

  6. 33 CFR 117.371 - Savannah River.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Savannah River. 117.371 Section 117.371 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Georgia § 117.371 Savannah River. (a) The draw of...

  7. 33 CFR 117.371 - Savannah River.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Savannah River. 117.371 Section 117.371 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Georgia § 117.371 Savannah River. (a) The draw of...

  8. 33 CFR 117.371 - Savannah River.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Savannah River. 117.371 Section 117.371 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Georgia § 117.371 Savannah River. (a) The draw of...

  9. 33 CFR 117.371 - Savannah River.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Savannah River. 117.371 Section 117.371 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Georgia § 117.371 Savannah River. (a) The draw of...

  10. 33 CFR 80.715 - Savannah River.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Savannah River. 80.715 Section 80.715 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY INTERNATIONAL NAVIGATION RULES COLREGS DEMARCATION LINES Seventh District § 80.715 Savannah River. A line drawn from...

  11. 33 CFR 117.371 - Savannah River.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Savannah River. 117.371 Section 117.371 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Georgia § 117.371 Savannah River. (a) The draw of...

  12. 33 CFR 80.715 - Savannah River.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Savannah River. 80.715 Section 80.715 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY INTERNATIONAL NAVIGATION RULES COLREGS DEMARCATION LINES Seventh District § 80.715 Savannah River. A line drawn from...

  13. 33 CFR 80.715 - Savannah River.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Savannah River. 80.715 Section 80.715 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY INTERNATIONAL NAVIGATION RULES COLREGS DEMARCATION LINES Seventh District § 80.715 Savannah River. A line drawn from...

  14. 33 CFR 80.715 - Savannah River.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Savannah River. 80.715 Section 80.715 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY INTERNATIONAL NAVIGATION RULES COLREGS DEMARCATION LINES Seventh District § 80.715 Savannah River. A line drawn from...

  15. Cesium in the Savannah River Site environment

    SciTech Connect

    Carlton, W.H.; Bauer, L.R.; Evans, A.G.; Geary, L.A.; Murphy, C.E. Jr.; Pinder, J.E.; Strom, R.N.

    1992-03-01

    Cesium in the Savannah River Site Environment is published as a part of the Radiological Assessment Program (RAP). It is the fourth in a series of eight documents on individual radioisotopes released to the environment as a result of Savannah River Site (SRS) operations. The earlier documents describe the environmental consequences of tritium, iodine, and uranium. Documents on plutonium, strontium, carbon, and technetium will be published in the future. These are dynamic documents and current plans call for revising and updating each one on a two-year schedule.Radiocesium exists in the environment as a result of above-ground nuclear weapons tests, the Chernobyl accident, the destruction of satellite Cosmos 954, small releases from reactors and reprocessing plants, and the operation of industrial, medical, and educational facilities. Radiocesium has been produced at SRS during the operation of five production reactors. Several hundred curies of [sup 137]Cs was released into streams in the late 50s and 60s from leaking fuel elements. Smaller quantities were released from the fuel reprocessing operations. About 1400 Ci of [sup 137]Cs was released to seepage basins where it was tightly bound by clay in the soil. A much smaller quantity, about four Ci. was released to the atmosphere. Radiocesium concentration and mechanisms for atmospheric, surface water, and groundwater have been extensively studied by Savannah River Technology Center (SRTC) and ecological mechanisms have been studied by Savannah River Ecology Laboratory (SREL). The overall radiological impact of SRS releases on the offsite maximum individual can be characterized by total doses of 033 mrem (atmospheric) and 60 mrem (liquid), compared with a dose of 12,960 mrem from non-SRS sources during the same period of time. Isotope [sup 137]Cs releases have resulted in a negligible risk to the environment and the population it supports.

  16. Cesium in the Savannah River Site environment

    SciTech Connect

    Carlton, W.H.; Bauer, L.R.; Evans, A.G.; Geary, L.A.; Murphy, C.E. Jr.; Pinder, J.E.; Strom, R.N.

    1992-03-01

    Cesium in the Savannah River Site Environment is published as a part of the Radiological Assessment Program (RAP). It is the fourth in a series of eight documents on individual radioisotopes released to the environment as a result of Savannah River Site (SRS) operations. The earlier documents describe the environmental consequences of tritium, iodine, and uranium. Documents on plutonium, strontium, carbon, and technetium will be published in the future. These are dynamic documents and current plans call for revising and updating each one on a two-year schedule.Radiocesium exists in the environment as a result of above-ground nuclear weapons tests, the Chernobyl accident, the destruction of satellite Cosmos 954, small releases from reactors and reprocessing plants, and the operation of industrial, medical, and educational facilities. Radiocesium has been produced at SRS during the operation of five production reactors. Several hundred curies of {sup 137}Cs was released into streams in the late 50s and 60s from leaking fuel elements. Smaller quantities were released from the fuel reprocessing operations. About 1400 Ci of {sup 137}Cs was released to seepage basins where it was tightly bound by clay in the soil. A much smaller quantity, about four Ci. was released to the atmosphere. Radiocesium concentration and mechanisms for atmospheric, surface water, and groundwater have been extensively studied by Savannah River Technology Center (SRTC) and ecological mechanisms have been studied by Savannah River Ecology Laboratory (SREL). The overall radiological impact of SRS releases on the offsite maximum individual can be characterized by total doses of 033 mrem (atmospheric) and 60 mrem (liquid), compared with a dose of 12,960 mrem from non-SRS sources during the same period of time. Isotope {sup 137}Cs releases have resulted in a negligible risk to the environment and the population it supports.

  17. Savannah River Site peer evaluator standards: Operator assessment for restart

    SciTech Connect

    Not Available

    1990-06-01

    Savannah River Site has implemented a Peer Evaluator program for the assessment of certified Central Control Room Operators, Central Control Room Supervisors and Shift Technical Engineers prior to restart. This program is modeled after the nuclear Regulatory Commission's (NRC's) Examiner Standard, ES-601, for the requalification of licensed operators in the commercial utility industry. It has been tailored to reflect the unique differences between Savannah River production reactors and commercial power reactors.

  18. Savannah River Site peer evaluator standards: Operator assessment for restart

    SciTech Connect

    Not Available

    1990-06-01

    Savannah River Site has implemented a Peer Evaluator program for the assessment of certified Central Control Room Operators, Central Control Room Supervisors and Shift Technical Engineers prior to restart. This program is modeled after the nuclear Regulatory Commission`s (NRC`s) Examiner Standard, ES-601, for the requalification of licensed operators in the commercial utility industry. It has been tailored to reflect the unique differences between Savannah River production reactors and commercial power reactors.

  19. Savannah River Site environmental report for 1995

    SciTech Connect

    Arnett, M.W.; Mamatey, A.

    1995-12-31

    The 1990s have brought dramatic change to the Savannah River Site (SRS) in its role as a key part of the U.S. Department of Energy`s (DOE) weapons complex. Shrinking federal budgets, sharp workforce reductions, the end of the Cold War, and a major shift in mission objectives have combined to severely test the mettle of SRS-South Carolina`s largest employer. But the sprawling 310-square-mile site`s employees have responded to the test in admirable fashion, effectively shifting their emphasis from weapons production to environmental restoration. This report describes the environmental report for the SRS for 1995.

  20. Savannah River Site environmental data for 1995

    SciTech Connect

    Arnett, M.W.

    1995-12-31

    This document presents data from Savannah River Site routine environmental monitoring and surveillance programs. An attempt also has been made to include all available data from environmental research programs.

  1. Savannah River Site 1991 Road Erosion Inventory.

    SciTech Connect

    Jones, Cliff.

    2007-06-22

    Final Report. USDA Forest Service, Savannah River, Aiken, SC. 28 pp. Abstract - This paper explains the rationale and results of a 1991 road erosion inventory conducted by members of the USDA Forest Service – Savannah River (FS-SR) and USDA Natural Resources Conservation Service (NRCS). The inventory provided information for the Department of Energy - Savannah River (DOE-SR) to justify the need for developing an erosion and sediment control program with appropriate funding, personnel, and equipment. Federally managed since the early 1950’s, the SRS is located on 198,344 acres (80,301 hectares) in the South Carolina counties of Aiken, Barnwell, and Allendale. Located along the eastern border of the Savannah River, the SRS is located within the Upper and Lower Coastal Plains of South Carolina.

  2. Advanced separations at Savannah River Site

    SciTech Connect

    Thompson, M.; McCabe, D.

    1996-10-01

    The Savannah River Site (SRS) has many waste streams that are contaminated with radionuclides and/or hazardous materials that must be treated to remove the radioactivity (cesium, strontium, tritium, actinides) and hazardous components (polychlorinated biphenyls (PCBs), cyanide, metal ions).

  3. Savannah River Technology Center, monthly report

    SciTech Connect

    Not Available

    1994-04-01

    This is the monthly report to detail the research currently being conducted at the Savannah River Technology Center. The areas of research are in Tritium, Seperation processes, Environmental Engineering, and Waste Management.

  4. 77 FR 6039 - Special Local Regulations; Savannah Tall Ships Challenge, Savannah River, Savannah, GA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... Federal Register (73 FR 3316). Public Meeting We do not plan to hold a public meeting, but you may submit... establish the following three areas: (1) Mooring zones; (2) buffer zones; and (3) a staging area. First... Savannah River in Savannah, Georgia. Second, buffer zones would be established around vessels...

  5. Consequence Analyses Following Potential Savannah River Site Hydrological Releases

    SciTech Connect

    Blanchard, A.

    1999-07-28

    Postulated accidental release of radiological material to surface water bodies on the Savannah River Site and the resulting downstream contamination of the Savannah River pose a potential threat to downstream river users.

  6. Savannah River site environmental report for 1996

    SciTech Connect

    Arnett, M.; Mamatey, A.

    1998-12-31

    The mission at the Savannah River Site (SRS) has changed from the production of nuclear weapons materials for national defense to the management of site-generated waste, restoration of the surrounding environment, and the development of industry in and around the site. However, SRS-through its prime operating contractor, Westinghouse Savannah River Company (WSRC)-continues to maintain a comprehensive environmental monitoring program. In 1996, effluent monitoring and environmental surveillance were conducted within a 31,000-square-mile area in and around SRS that includes neighboring cities, towns, and counties in Georgia and South Carolina and extends up to 100 miles from the site. Though the environmental monitoring program was streamlined in 1996-to improve its cost-effectiveness without compromising data quality or reducing its overall ability to produce critical information-thousands of samples of air, surface water, groundwater, food products, drinking water, wildlife, rainwater, soil, sediment, and vegetation were collected and analyzed for radioactive and nonradioactive contaminants.

  7. 33 CFR 165.T0704 - Safety Zone: Savannah River, Savannah, Georgia.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Safety Zone: Savannah River, Savannah, Georgia. 165.T0704 Section 165.T0704 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF....T0704 Safety Zone: Savannah River, Savannah, Georgia. (a) Location. The following area is a safety...

  8. 33 CFR 165.T0704 - Safety Zone: Savannah River, Savannah, Georgia.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Safety Zone: Savannah River, Savannah, Georgia. 165.T0704 Section 165.T0704 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF....T0704 Safety Zone: Savannah River, Savannah, Georgia. (a) Location. The following area is a safety...

  9. 33 CFR 165.T0704 - Safety Zone: Savannah River, Savannah, Georgia.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Safety Zone: Savannah River, Savannah, Georgia. 165.T0704 Section 165.T0704 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF....T0704 Safety Zone: Savannah River, Savannah, Georgia. (a) Location. The following area is a safety...

  10. 33 CFR 165.T0704 - Safety Zone: Savannah River, Savannah, Georgia.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Safety Zone: Savannah River, Savannah, Georgia. 165.T0704 Section 165.T0704 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF....T0704 Safety Zone: Savannah River, Savannah, Georgia. (a) Location. The following area is a safety...

  11. 33 CFR 165.T0704 - Safety Zone: Savannah River, Savannah, Georgia.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Safety Zone: Savannah River, Savannah, Georgia. 165.T0704 Section 165.T0704 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF....T0704 Safety Zone: Savannah River, Savannah, Georgia. (a) Location. The following area is a safety...

  12. Composition of phytoplankton communities and their contribution to secondary productivity in Carolina Bays on the Savannah River Plant

    SciTech Connect

    Williams, J.B.

    1990-08-01

    This three-year collaborative project with Savannah River Ecology Lab (SREL) has an overall goal to determine the importance of phytoplankton (microscopic algae) as a component of the food chain base in SRS Carolina Bays. The importance of zooplankton (microscopic crustacean herbivores) to the early life stages of amphibians in these Carolina Bays has been determined by previous investigators and ongoing SREL studies. Our project is testing hypotheses that phytoplankton compose the most important part of zooplankton diets in SRS bays. Considerable progress has been made on each of the YEAR TWO proposal objectives. Proposed work for one of the objectives will not be completed by the end of the project year due to the high work volume required for the stable isotope sampling. All sampling for primary productivity and stable isotope analyses has been completed. However, scheduled samples for the hotter summer temperatures during July were not collected due to the fact that Flamingo, Ellenton, and Rainbow Bays had already dried up. Progress for each of the Proposal Year One objectives is summarized in this report along with summaries for supplemental objectives. Detailed discussions of methodology and results are also found in the report. 11 refs., 6 figs.

  13. Ichthyoplankton entrainment study at the SRS Savannah River water intakes for Westinghouse Savannah River Company

    SciTech Connect

    Paller, M. )

    1992-03-26

    Cooling water for L and K Reactors and makeup water for Par Pond is pumped from the Savannah River at the 1G, 3G, and 5G pump houses. Ichthyoplankton (drifting fish larvae and eggs) from the river are entrained into the reactor cooling systems with the river water and passed through the reactor's heat exchangers where temperatures may reach 70[degrees]C during full power operation. Ichthyoplankton mortality under such conditions is assumed to be 100 percent. The number of ichthyoplankton entrained into the cooling system depends on a variety of variables, including time of year, density and distribution of ichthyoplankton in the river, discharge levels in the river, and the volume of water withdrawn by the pumps. Entrainment at the 1 G pump house, which is immediately downstream from the confluence of Upper Three Runs Creek and the Savannah River, is also influenced by discharge rates and ichthyoplankton densities in Upper Three Runs Creek. Because of the anticipated restart of several SRS reactors and the growing concern surrounding striped bass and American shad stocks in the Savannah River, the Department of Energy requested that the Environmental Sciences Section (ESS) of the Savannah River Laboratory sample ichthyoplankton at the SRS Savannah River intakes. Dams Moore, Inc., under a contract with Westinghouse Savannah River Company performed the sampling and data analysis for the ESS.

  14. SAVANNAH RIVER TECHNOLOGY CENTER MONTHLY REPORT AUGUST 1992

    SciTech Connect

    Ferrell, J.M.

    1999-06-21

    'This monthly report summarizes Programs and Accomplishments of the Savannah River Technology Center in support of activities at the Savannah River Site. The following categories are addressed: Reactor, Tritium, Separations, Environmental, Waste Management, General, and Items of Interest.'

  15. Robotics development programs overview Savannah River Plant

    SciTech Connect

    Heckendorn, F.M.; Veenema, P.

    1988-01-01

    The Savannah River Laboratory (SRL) continues to provide support to the Savannah River Plant (SRP) in many areas to Robotics and Vision. An overview of the current and near term future developments are presented. The driving forces for Robotics and Remote vision systems at SRP include both the classic reasons for industrial robotics installation (i.e., repetitive and undesirable jobs) and those reasons related to radioactive environments. Protection of personnel from both radiation and radioactive contamination benefit greatly from robotic and telerobotics. In addition the quality of the information available from a hazardous environment can be improved by the ability to visually linger and remotely sense.

  16. Mobile teleoperator research at Savannah River Laboratory

    SciTech Connect

    Byrd, J S

    1985-01-01

    A Robotics Technology Group was organized at Savannah River Laboratory to employ modern automation and robotics for applications at the Savannah River site. Several industrial robots have been installed in plant processes. Other robotics systems are under development in the laboratories, including mobile teleoperators for general remote tasks and emergency response operations. This paper discusses present work on a low-cost wheeled mobile vehicle, a modular light duty manipulator arm, a large gantry telerobot system, and a high technology six-legged walking robot with a teleoperated arm.

  17. Machinery Vibration Monitoring Program at the Savannah River Site

    SciTech Connect

    Potvin, M.M.

    1990-01-01

    The Reactor Maintenance's Machinery Vibration Monitoring Program (MVMP) plays an essential role in ensuring the safe operation of the three Production Reactors at the Westinghouse Savannah River Company (WRSC) Savannah River Site (SRS). This program has increased machinery availability and reduced maintenance cost by the early detection and determination of machinery problems. This paper presents the Reactor Maintenance's Machinery Vibration Monitoring Program, which has been documented based on Electric Power Research Institute's (EPRI) NP-5311, Utility Machinery Monitoring Guide, and some examples of the successes that it has enjoyed.

  18. Savannah River Site ECS-2 tests uncertainty report

    SciTech Connect

    Wilkins, S.C.; Larson, R.A.

    1990-07-01

    This document presents a measurement uncertainty analysis for the instruments used in the ECS-2 test series conducted for the Savannah River Site at the Idaho National Engineering Laboratory. The tests are a series of downflow dryout heat transfer experiments designed to support computer code development and verification in setting limits for the Savannah River Production reactors. The measurements include input current, voltage, and power; air and water flows, fluid and metal temperatures, and absolute and differential pressures. An analysis of the data acquisition system as it relates to these measurements is also included. 18 refs., 6 figs., 12 tabs.

  19. Entrainment sampling at the Savannah River Site (SRS) Savannah River water intakes (1991)

    SciTech Connect

    Paller, M.

    1990-11-01

    Cooling water for the Westinghouse Savannah River Company (WSRC) L-Reactor, K-Reactor, and makeup water for Par Pond is pumped from the Savannah River at the 1G, 3G, and 5G pumphouses. Ichthyoplankton (drifting fish larvae and eggs) from the river are entrained into the reactor cooling systems with the river water. They are passed through the reactor heat exchangers where temperatures may reach 70{degree}C during full power operation. Ichthyoplankton mortality under such conditions is presumably 100%. Apart from a small pilot study conducted in 1989, ichthyoplankton samples have not been collected from the vicinity of the SRS intake canals since 1985. The Department of Energy (DOE) has requested that the Environmental Sciences Section (ESS) of the Savannah River Laboratory (SRL) resume ichthyoplankton sampling for the purpose of assessing entrainment at the SRS Savannah River intakes. This request is due to the anticipated restart of several SRS reactors and the growing concern surrounding striped bass and American shad stocks in the Savannah River. The following scope of work presents a sampling plan that will collect information on the spatial and temporal distribution of fish eggs and larvae near the SRS intake canal mouths. This data will be combined with information on water movement patterns near the canal mouths in order to determine the percentage of ichthyoplankton that are removed from the Savannah River by the SRS intakes. The following sampling plan incorporates improvements in experimental design that resulted from the findings of the 1989 pilot study. 1 fig.

  20. Fifty Years of Transuranic Waste at Savannah River Site

    SciTech Connect

    Gibbs, A.

    2002-11-20

    Three years into the Cold War, in 1950, President Truman asked the E. I. du Pont de Nemours Company to build and operate a plant to produce materials for nuclear weapons. This document covers 50 years of transuranic waste at Savannah River Site from production to cleanup.

  1. Assessment of selected fission products in the Savannah River Site environment

    SciTech Connect

    Carlton, W.H.; Denham, M.

    1997-04-01

    Most of the radioactivity produced by the operation of a nuclear reactor results from the fission process, during which the nucleus of a fissionable atom (such as 235U) splits into two or more nuclei, which typically are radioactive. The Radionuclide Assessment Program (RAP) has reported on fission products cesium, strontium, iodine, and technetium. Many other radionuclides are produced by the fission process. Releases of several additional fission products that result in dose to the offsite population are discussed in this publication. They are 95Zr, 95Nb, 103Ru, 106Ru, 141Ce, and 144Ce. This document will discuss the production, release, migration, and dose to humans for each of these selected fission products.

  2. Carolina bays of the Savannah River Plant

    SciTech Connect

    Schalles, J.F. ); Sharitz, R.R.; Gibbons, J.W.; Leversee, G.J.; Knox, J.N. )

    1989-01-01

    Much of the research to date on the Carolina bays of the Savannah River Plant and elsewhere has focused on certain species or on environmental features. Different levels of detail exist for different groups of organisms and reflect the diverse interests of previous investigators. This report summarizes aspects of research to date and presents data from numerous studies. 70 refs., 14 figs., 12 tabs.

  3. Land Use Baseline Report Savannah River Site

    SciTech Connect

    Noah, J.C.

    1995-06-29

    This document is to serve as a resource for Savannah River Site managers, planners, and SRS stakeholders by providing a general description of the site and land-use factors important to future use decisions and plans. The intent of this document is to be comprehensive in its review of SRS and the surrounding area.

  4. Savannah River Technology Center. Monthly report

    SciTech Connect

    Not Available

    1993-01-01

    This is a monthly progress report from the Savannah River Laboratory for the month of January 1993. It has sections with work in the areas of reactor safety, tritium processes and absorption, separations programs and wastes, environmental concerns and responses, waste management practices, and general concerns.

  5. Savannah River Laboratory monthly report, February 1992

    SciTech Connect

    Ferrell, J.M.; Ice, L.W.

    1992-02-01

    This report is a progress report for the Savannah River Laboratory for the month of February 1992. The progress and activities in six categories were described in the report. The categories are reactor, tritium, separations, environmental, waste management, and general. Each category described numerous and varied activities. Some examples of these activities described are such things as radiation monitoring, maintenance, modifications, and remedial action.

  6. Savannah River Technology Center. Monthly report

    SciTech Connect

    Not Available

    1994-02-01

    This document contains information about the research programs being conducted at the Savannah River Plant. Topics of discussion include: thermal cycling absorption process, development of new alloys, ion exchange, oxalate precipitation, calcination, environmental research, remedial action, ecological risk assessments, chemical analysis of salt cakes, natural phenomena hazards assessment, and sampling of soils and groundwater.

  7. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect

    Not Available

    1992-08-03

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official document of the analytical results.

  8. The Savannah River Site's groundwater monitoring program

    SciTech Connect

    Not Available

    1991-10-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results.

  9. Savannah River Technology Center monthly report

    SciTech Connect

    Not Available

    1994-03-01

    This document contains information about the research programs being conducted at the Savannah River Plant. Topics of discussion include: Acorn Cleaning Study, tritium, separation processes, bioremediation programs, environmental remediation, environmental sampling, waste management, statistical design, phase I array experiments, and, Monte Carlo Neutron Photon input files.

  10. Savannah River Site Environmental Report for 2002

    SciTech Connect

    Mamatey, A.R.

    2003-07-21

    The Savannah River Site (SRS), one of the facilities in the U.S. Department of Energy (DOE) complex, was constructed during the early 1950s to produce basic materials (such as plutonium-239 and tritium) used in nuclear weapons. The site covers approximately 310 square miles in South Carolina and borders the Savannah River. Various industrial, manufacturing, medical, and farming operations are conducted near the site. Several major industrial and manufacturing facilities are located in the area, and a variety of crops is produced on local farms. SRS is bounded on its southwestern border by the Savannah River for about 35 river miles and is approximately 160 river miles from the Atlantic Ocean. The SRS region is part of the Southern Bottomland Hardwood Swamp region, which extends south from Virginia to Florida and west along the Gulf of Mexico to the Mississippi River drainage basin. Originally, site facilities generated materials for nuclear weapons. Since the end of the Cold War in 199 1, however, their purpose has shifted to the stabilization of nuclear materials from onsite and offsite sources to ensure safe long-term storage or disposal. SRS has always been concerned about the safety of the public. The site is committed to protecting human health and reducing the risks associated with past, current, and future operations. Sampling locations, sample media, sampling frequency, and types of analysis are selected based on environmental regulations, exposure pathways, public concerns, and measurement capabilities.

  11. The DWPF product composition control system at Savannah River: Statistical process control algorithm

    SciTech Connect

    Postles, R.L.; Brown, K.G.

    1991-01-01

    The DWPF Process batch-blends aqueous radwaste (PHA) with solid radwaste (Sludge) in a waste receipt vessel (the SRAT). The resulting SRAT-Batch is transferred to the next process vessel (the SME) and there blended with ground glass (Frit) to produce a batch of feed slurry. The SME-Batch is passed to a subsequent hold tank (the MFT) which feeds a Melter continuously. The Melter produces a molten glass wasteform which is poured into stainless steel canisters for cooling and, ultimately, shipment to and storage in a geologic Repository. The Repository will require that the glass wasteform be resistant to leaching by any underground water that might contact it. In addition, there are processing constraints on Viscosity and Liquidus Temperature of the melt. The Product Composition Control System (PCCS) is the system intended to ensure that the melt will be Processible and that the glass wasteform will be Acceptable. Within the PCCS, the SPC Algorithm is the device which guides control of the DWPF process. The SPC Algorithm is needed to control the multivariate DWPF process in the face of uncertainties (variances and covariances) which arise from this process and its supply, sampling, modeling, and measurement systems.

  12. The DWPF product composition control system at Savannah River: Statistical process control algorithm

    SciTech Connect

    Postles, R.L.; Brown, K.G.

    1991-12-31

    The DWPF Process batch-blends aqueous radwaste (PHA) with solid radwaste (Sludge) in a waste receipt vessel (the SRAT). The resulting SRAT-Batch is transferred to the next process vessel (the SME) and there blended with ground glass (Frit) to produce a batch of feed slurry. The SME-Batch is passed to a subsequent hold tank (the MFT) which feeds a Melter continuously. The Melter produces a molten glass wasteform which is poured into stainless steel canisters for cooling and, ultimately, shipment to and storage in a geologic Repository. The Repository will require that the glass wasteform be resistant to leaching by any underground water that might contact it. In addition, there are processing constraints on Viscosity and Liquidus Temperature of the melt. The Product Composition Control System (PCCS) is the system intended to ensure that the melt will be Processible and that the glass wasteform will be Acceptable. Within the PCCS, the SPC Algorithm is the device which guides control of the DWPF process. The SPC Algorithm is needed to control the multivariate DWPF process in the face of uncertainties (variances and covariances) which arise from this process and its supply, sampling, modeling, and measurement systems.

  13. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  14. Characterization of Savannah River Plant waste glass

    SciTech Connect

    Plodinec, M J

    1985-01-01

    The objective of the glass characterization programs at the Savannah River Laboratory (SRL) is to ensure that glass containing Savannah River Plant high-level waste can be permanently stored in a federal repository, in an environmentally acceptable manner. To accomplish this objective, SRL is carrying out several experimental programs, including: fundamental studies of the reactions between waste glass and water, particularly repository groundwater; experiments in which candidate repository environments are simulated as accurately as possible; burial tests of simulated waste glass in candidate repository geologies; large-scale tests of glass durability; and determination of the effects of process conditions on glass quality. In this paper, the strategy and current status of each of these programs is discussed. The results indicate that waste packages containing SRP waste glass will satisfy emerging regulatory criteria.

  15. Waste management units - Savannah River Site

    SciTech Connect

    Not Available

    1989-10-01

    This report is a compilation of worksheets from the waste management units of Savannah River Plant. Information is presented on the following: Solid Waste Management Units having received hazardous waste or hazardous constituents with a known release to the environment; Solid Waste Management Units having received hazardous waste or hazardous constituents with no known release to the environment; Solid Waste Management Units having received no hazardous waste or hazardous constituents; Waste Management Units having received source; and special nuclear, or byproduct material only.

  16. Waste management units: Savannah River Site

    SciTech Connect

    Molen, G.

    1991-09-01

    This report indexes every waste management unit of the Savannah River Site. They are indexed by building number and name. The waste units are also tabulated by solid waste units receiving hazardous materials with a known release or no known release to the environment. It also contains information on the sites which has received no hazardous waste, and units which have received source, nuclear, or byproduct material only. (MB)

  17. Savannah River Technology Center monthly report

    SciTech Connect

    Ferrell, J.M.

    1993-09-01

    This is a monthly report published by Westinghouse Savannah River Company. Topics discussed in this progress report are: Terrazzo reservoir, Replacement Tritium Facility Final Safety Analysis Report, tritium processing and disposal, separation processes, environmental effects and future impacts, laboratory performance evaluation, groundwater characterization, mixed waste management facility, Raman Spectroscopy, waste processing, Defense Waste Processing Facility, mercury recycling, off-gas components testing, incineration facility blowdown solidification, and weld residual stress minimization study.

  18. Watershed modeling at the Savannah River Site.

    SciTech Connect

    Vache, Kellie

    2015-04-29

    The overall goal of the work was the development of a watershed scale model of hydrological function for application to the US Department of Energy’s (DOE) Savannah River Site (SRS). The primary outcomes is a grid based hydrological modeling system that captures near surface runoff as well as groundwater recharge and contributions of groundwater to streams. The model includes a physically-based algorithm to capture both evaporation and transpiration from forestland.

  19. SAVANNAH RIVER NATIONAL LABORATORY HYDROGEN TECHNOLOGY RESEARCH

    SciTech Connect

    Danko, E

    2008-02-08

    The Savannah River National Laboratory (SRNL) is a U.S. Department of Energy research and development laboratory located at the Savannah River Site (SRS) near Aiken, South Carolina. SRNL has over 50 years of experience in developing and applying hydrogen technology, both through its national defense activities as well as through its recent activities with the DOE Hydrogen Programs. The hydrogen technical staff at SRNL comprises over 90 scientists, engineers and technologists, and it is believed to be the largest such staff in the U.S. SRNL has ongoing R&D initiatives in a variety of hydrogen storage areas, including metal hydrides, complex hydrides, chemical hydrides and carbon nanotubes. SRNL has over 25 years of experience in metal hydrides and solid-state hydrogen storage research, development and demonstration. As part of its defense mission at SRS, SRNL developed, designed, demonstrated and provides ongoing technical support for the largest hydrogen processing facility in the world based on the integrated use of metal hydrides for hydrogen storage, separation, and compression. The SRNL has been active in teaming with academic and industrial partners to advance hydrogen technology. A primary focus of SRNL's R&D has been hydrogen storage using metal and complex hydrides. SRNL and its Hydrogen Technology Research Laboratory have been very successful in leveraging their defense infrastructure, capabilities and investments to help solve this country's energy problems. SRNL has participated in projects to convert public transit and utility vehicles for operation using hydrogen fuel. Two major projects include the H2Fuel Bus and an Industrial Fuel Cell Vehicle (IFCV) also known as the GATOR{trademark}. Both of these projects were funded by DOE and cost shared by industry. These are discussed further in Section 3.0, Demonstration Projects. In addition to metal hydrides technology, the SRNL Hydrogen group has done extensive R&D in other hydrogen technologies, including

  20. Savannah River Remediation Cost Savings Initiative - 12339

    SciTech Connect

    Davis, Neil R.

    2012-07-01

    Savannah River enjoyed two years of increased funding as a result of the American Reinvestment and Recovery Act and Department of Energy (DOE) directed scope additions. Moving into FY2012, a much lower funding level is anticipated. In the past, the first response to a reduced funding scenario was to defer scope and slow down the program. This time, Savannah River decided that a better process was needed to try to maximize value to the government. This approach was named the Cost Savings Initiative (CSI). The CSI process is similar to a zero-based budget concept. Every element of work scope was screened to eliminate everything that was not directly related to safety and regulatory compliance. Then the schedules for the regulatory-driven scope were deferred such that the regulatory milestones were achieved just in time with no acceleration. This resulted in a strategy that met regulatory requirements in FY2012-13 with some remaining funding but not in FY2014-15. The remaining funding was then invested in cost savings initiatives in FY2012-13 to reduce the future cost of doing business in the FY2014-15 timeframe and beyond. This resulted in a Strategy that: - Meets all regulatory commitments; - Meets some regulatory commitments early; and - Preserves most of the life cycle savings that were built in to the baseline plan The CSI process used at Savannah River may be considered for application elsewhere in the DOE Complex. (authors)

  1. Environmental justice at the Savannah River Site

    SciTech Connect

    Flemming, R.; Hooker, K.L.

    1995-12-31

    Environmental justice is the conscious commitment to ensure that poor and/or minority communities are not disproportionately bearing adverse human health and environmental effects from the production, processing, or disposal of hazardous or toxic waste. To focus federal attention on assessing the environmental and human health conditions in minority and/or low-income communities surrounding federal facilities, on February 11, 1994, President Clinton signed Executive Order (EO) 12898. As part of the strategy to comply with EO 12898, the President required all federal agencies to develop localized strategies to ensure that their programs and policies are consistent with EO 12898. This would incorporate mechanisms for increasing public participation opportunities for involvement in the decision making, easier access to information, and the collection and analysis of economic, demographic, and food consumption data in surrounding communities. The U.S. Department of Energy (DOE) responded by issuing its Environmental Justice Strategy 2 (April 1995), although many of its field offices had been actively implementing activities in support of the executive order since its issuance. One DOE facility, the Savannah River Site (SRS), which is located in west central South Carolina, is making great strides toward implementing a successful public participation program, which includes environmental justice initiatives.

  2. 77 FR 30518 - Support of Deployment of Prototype Small Modular Reactors at the Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ...DOE-Savannah River Operations Office (SR), in conjunction with the Savannah River National Laboratory (SRNL), announces the availability of support for deployment of Small Modular Reactors (SMR) on the Savannah River Site...

  3. Biological surveys on the Savannah River in the vicinity of the Savannah River Plant (1951-1976)

    SciTech Connect

    Matthews, R. A.

    1982-04-01

    In 1951, the Academy of Natural Sciences of Philadelphia was contracted by the Savannah River Plant to initiate a long-term monitoring program in the Savannah River. The purpose of this program was to determine the effect of the Savannah River Plant on the Savannah River aquatic ecosystem. The data from this monitoring program have been computerized by the Savannah River Laboratory, and are summarized in this report. During the period from 1951-1976, 16 major surveys were conducted by the Academy in the Savannah River. Water chemistry analyses were made, and all major biological communities were sampled qualitatively during the spring and fall of each survey year. In addition, quantitative diatom data have been collected quarterly since 1953. Major changes in the Savannah River basin, in the Savannah River Plant's activities, and in the Academy sampling patterns are discussed to provide a historical overview of the biomonitoring program. Appendices include a complete taxonomic listing of species collected from the Savannah River, and summaries of the entire biological and physicochemical data base.

  4. Downgrade of the Savannah River Sites FB-Line

    SciTech Connect

    SADOWSKI, ED; YOURCHAK, RANDY; PRETZELLO MARJI; MIXON, BONNIE; LYNN, ROBBIE

    2005-07-05

    This paper will discuss the Safeguards & Security (S&S) activities that resulted in the downgrade of the Savannah River Site's FB-Line (FBL) from a Category I Material Balance Area (MBA) in a Material Access Area (MAA) to a Category IV MBA in a Property Protection Area (PPA). The Safeguards activities included measurement of final product items, transferal of nuclear material to other Savannah River Site (SRS) facilities, discard of excess nuclear material items, and final measurements of holdup material. The Security activities included relocation and destruction of classified documents and repositories, decertification of a classified computer, access control changes, updates to planning documents, deactivation and removal of security systems, Human Reliability Program (HRP) removals, and information security training for personnel that will remain in the FBL PPA.

  5. Savannah River Site environmental report for 1991

    SciTech Connect

    Arnett, M.W.; Karapatakis, L.K.; Mamatey, A.R.; Todd, J.L.

    1991-01-01

    This report describes environmental activities conducted on and in the vicinity of the Savannah River Site (SRS) in Aiken, S.C., from Jan. 1 to Dec. 31, 1991, with an update on compliance activities through April 1, 1992. The report is a single volume with a separate summary pamphlet highlighting the major findings for 1991. The report is divided into an executive summary and 14 chapters containing information on environmental compliance issues, environmental monitoring methods and programs, and environmental research activities for 1991, as well as historical data from previous years. Analytical results, figures, charts, and data tables relevant to the environmental monitoring program for 1991 at SRS are included.

  6. Savannah River Site Environmental Report for 2004

    SciTech Connect

    Mamatey, Albert R.

    2005-06-07

    The Savannah River Site Environmental Report for 2004 (WSRC-TR-2005-00005) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1A, ''Environment, Safety and Health Reporting,'' and DOE Order 5400.5, ''Radiation Protection of the Public and Environment''. The report's purpose is to present summary environmental data that characterize site environmental management performance; confirm compliance with environmental standards and requirements; highlight significant programs and efforts; and assess the impact of SRS operations on the public and the environment.

  7. SAVANNAH RIVER SITE ENVIRONMENTAL REPORT FOR 2005

    SciTech Connect

    Mamatey, A

    2006-07-18

    The ''Savannah River Site Environmental Report for 2005'' (WSRC-TR-2006-00007) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1A, ''Environment, Safety and Health Reporting'', and DOE Order 5400.5, ''Radiation Protection of the Public and Environment''. The report's purpose is to: present summary environmental data that characterize site environmental management performance; confirm compliance with environmental standards and requirements; highlight significant programs and efforts; and assess the impact of SRS operations on the public and the environment.

  8. SAVANNAH RIVER ENVIRONMENTAL REPORT FOR 2006

    SciTech Connect

    Mamatey, A

    2007-08-22

    The ''Savannah River Site Environmental Report for 2006'' (WSRC-TR-2007-00008) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1A, ''Environment, Safety and Health Reporting'', and DOE Order 5400.5, ''Radiation Protection of the Public and Environment''. The report's purpose is to: present summary environmental data that characterize site environmental management performance; confirm compliance with environmental standards and requirements; highlight significant programs and efforts; and assess the impact of SRS operations on the public and the environment.

  9. SAVANNAH RIVER SITE ENVIRONMENTAL REPORT FOR 2007

    SciTech Connect

    Mamatey, A

    2008-08-27

    The Savannah River Site Environmental Report for 2007 (WSRC-STI-2008-00057) prepared for the US Department of Energy (DOE) according to requirements of DOE Order 231.1A, 'Environment, Safety and Health Reporting', and DOE Order 5400.5, 'Radiation Protection of the Public and Environment'. The report's purpose is to: (1) present summary environmental data that characterize site environmental management performance; (2) confirm compliance with environmental standards and requirements; (3) highlight significant programs and efforts; (4) assess the impact of SRS operations on the public and the environment.

  10. Savannah River Site Environmental Data for 1994

    SciTech Connect

    Arnett, M.W.

    1994-12-16

    Tables in this document present data from routine environmental monitoring and surveillance programs at the Savannah River Site. An attempt has been made to include all available data from environmental research programs. The first section of the book is a collection of maps of radiological and non radiological sampling locations. Also included are a list of the media sampled, along with sample sizes and representative aliquots; the minimum detectable concentrations for gamma analysis of soil, food, fish and wildlife, and vegetation samples; and a list of the minimum detectable concentrations for Environmental Monitoring Section radiological analyses.

  11. Moderator detritiation at the Savannah River Plant

    SciTech Connect

    Baumgarten, P.K.; Howard, D.W.

    1985-09-01

    A study has been made of the technical and economic aspects of reducing tritium concentration in Savannah River Plant heavy-water moderator by 90%. A single detritiation plant would serve four operating reactors and the desired tritium reduction would be achieved in less than ten years. The process choice has narrowed to three processes. These involve a front-end extraction or preparation of molecular DT in a D/sub 2/ stream, and a back-end fractional distillation of this stream followed by catalytic conversion to make 98% tritium T/sub 2/.

  12. Savannah River Site environmental report for 1988

    SciTech Connect

    Cummins, C.L.; Hetrick, C.S.; Stevenson, D.A.; Davis, H.A.; Martin, D.K.; Todd, J.L.

    1989-01-01

    This volume of Savannah River Site Environmental report for 1988 (WSRC-RP-89-59-1) contains the figures and tables referenced in Volume 1. The figures contain graphic illustrations of sample locations and/or data. The tables contain summaries of the following types of data: Federal and State standards and guides applicable to SRS operations; concentrations of radioactivity in environmental media; the quantity of radioactivity released to the environment from SRS operations; offsite radiation dose commitments from SRS operations; measurements of physical properties, chemicals, and metals concentrations in environmental media; and interlaboratory comparison of analytical results.

  13. Savannah River Laboratory monthly report

    SciTech Connect

    Not Available

    1985-12-01

    Efforts in the area of nuclear reactors and scientific computations are reported, including: robotics; reactor irradiation of nonend-bonded target slugs; computer link with Los Alamos National Laboratory; L-reactor thermal mitigation; aging of carbon in SRP reactor airborne activity confinement systems; and reactor risk assessment for earthquakes. Activities in chemical processes and environmental technology are reported, including: solids formation in a plutonium product stream; revised safety analysis reporting for F and H-Canyon operations; organic carbon analysis of DWPF samples; applications of Fourier transform infrared spectrometry; water chemistry analyzer for SRP reactors; and study of a biological community in Par Pond. Defense waste and laboratory operations activities include: Pu-238 waste incinerator startup; experimental canister frit blaster; saltstone disposal area design; powder metallurgy core diameter measurement; and a new maintenance shop facility. Nuclear materials planning encompasses decontamination and decommissioning of SRP facilities and a comprehensive compilation of environmental and nuclear safety issues. (LEW)

  14. The Savannah River Technology Center Research and Development Climatology Center

    SciTech Connect

    Kurzeja, R.J.

    1995-12-31

    The Environmental Technology Section (ETS) of the Savannah River Technology Center (SRTC) built and has operated the Climatology Site (CS) for almost 10 years. The Climatology Site provides a wide variety of meteorological support functions for Savannah River Site (SRS) operations and research. This document describes the Climatology Site facility to familiarize present and potential users with its capabilities.

  15. 46 CFR 7.75 - Savannah River/Tybee Roads.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Savannah River/Tybee Roads. 7.75 Section 7.75 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC BOUNDARY LINES Atlantic Coast § 7.75 Savannah River/Tybee Roads. A line drawn from the southwesternmost extremity of...

  16. 46 CFR 7.75 - Savannah River/Tybee Roads.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Savannah River/Tybee Roads. 7.75 Section 7.75 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC BOUNDARY LINES Atlantic Coast § 7.75 Savannah River/Tybee Roads. A line drawn from the southwesternmost extremity of...

  17. 46 CFR 7.75 - Savannah River/Tybee Roads.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Savannah River/Tybee Roads. 7.75 Section 7.75 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC BOUNDARY LINES Atlantic Coast § 7.75 Savannah River/Tybee Roads. A line drawn from the southwesternmost extremity of...

  18. 46 CFR 7.75 - Savannah River/Tybee Roads.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Savannah River/Tybee Roads. 7.75 Section 7.75 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC BOUNDARY LINES Atlantic Coast § 7.75 Savannah River/Tybee Roads. A line drawn from the southwesternmost extremity of...

  19. 46 CFR 7.75 - Savannah River/Tybee Roads.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Savannah River/Tybee Roads. 7.75 Section 7.75 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC BOUNDARY LINES Atlantic Coast § 7.75 Savannah River/Tybee Roads. A line drawn from the southwesternmost extremity of...

  20. Guide to Savannah River Laboratory Analytical Services Group

    SciTech Connect

    Not Available

    1990-04-01

    The mission of the Analytical Services Group (ASG) is to provide analytical support for Savannah River Laboratory Research and Development Programs using onsite and offsite analytical labs as resources. A second mission is to provide Savannah River Site (SRS) operations with analytical support for nonroutine material characterization or special chemical analyses. The ASG provides backup support for the SRS process control labs as necessary.

  1. The Savannah River Site local area network

    SciTech Connect

    Johnson, A.J.

    1989-01-01

    The Savannah River Site (SRS) consists of thirteen separate operating or administrative facilities, or areas, spread out over 300 square miles of federal reservation. A facility of this size presents rather unique difficulties to anyone attempting to provide a comprehensive and high performance computer network, or local area network (LAN). Figure 1 is a diagram of the SRS and indicates the approximate number of ''knowledge workers'' (i.e., managerial, professional, and clerical staff) which are located in each site area. The goal of the SRS LAN project is to have each of these workers connected to and using the computer network by the end of 1990. By mid 1989 SRS is three quarters of the way to completing this goal. The fundamental LAN strategy for Savannah River is the integration of personal computers with mid size ''departmental'' computers located within each site area with links to the site's mainframe computer systems and offsite databases for information access. This integration is being provided by baseband local area networks in each of the site areas adjoined together via a broadband and digital telephone communications system to form one sitewide internetwork. The site internetwork is used to connect the departmental and mainframe computers together as well as provide workstation to computer access between site areas. 6 figs.

  2. Mammals of the Savannah River Site

    SciTech Connect

    Cothran, E.G.; Smith, M.H.; Wolff, J.O.; Gentry, J.B.

    1991-12-31

    This book is designed to be used as a field guide, reference book, bibliography, and introduction to the basic biology and ecology of the 54 mammal species that currently or potentially exist on or near the Savannah River Site (SRS). For 50 of these species, we present basic descriptions, distinguishing morphological features, distribution and habitat preferences, food habits, reproductive biology, social behavior, ecological relationships with other species, and economic importance to man. For those species that have been studied on the SRS, we summarize the results of these studies. Keys and illustrations are provided for whole body and skull identification. A selected glossary defines technical terminology. Illustrations of tracks of the more common larger mammals will assist in field identifications. We also summarize the results of two major long-term SRS studies, ``The Forbearer Census`` and ``White-tailed Deer Studies``. A cross-indexed list of over 300 SRS publications on mammals classifies each publication by 23 categories such as habitat, reproduction, genetics, etc., and also for each mammal species. The 149 Master`s theses and Ph.D. dissertations that have been conducted at the Savannah River Ecology Laboratory are provided as additional references.

  3. Mammals of the Savannah River Site

    SciTech Connect

    Cothran, E.G.; Smith, M.H.; Wolff, J.O.; Gentry, J.B.

    1991-01-01

    This book is designed to be used as a field guide, reference book, bibliography, and introduction to the basic biology and ecology of the 54 mammal species that currently or potentially exist on or near the Savannah River Site (SRS). For 50 of these species, we present basic descriptions, distinguishing morphological features, distribution and habitat preferences, food habits, reproductive biology, social behavior, ecological relationships with other species, and economic importance to man. For those species that have been studied on the SRS, we summarize the results of these studies. Keys and illustrations are provided for whole body and skull identification. A selected glossary defines technical terminology. Illustrations of tracks of the more common larger mammals will assist in field identifications. We also summarize the results of two major long-term SRS studies, The Forbearer Census'' and White-tailed Deer Studies''. A cross-indexed list of over 300 SRS publications on mammals classifies each publication by 23 categories such as habitat, reproduction, genetics, etc., and also for each mammal species. The 149 Master's theses and Ph.D. dissertations that have been conducted at the Savannah River Ecology Laboratory are provided as additional references.

  4. 2004 Savannah River Cooling Tower Collection (U)

    SciTech Connect

    Garrett, Alfred; Parker, Matthew J.; Villa-Aleman, E.

    2005-05-01

    The Savannah River National Laboratory (SRNL) collected ground truth in and around the Savannah River Site (SRS) F-Area cooling tower during the spring and summer of 2004. The ground truth data consisted of air temperatures and humidity inside and around the cooling tower, wind speed and direction, cooling water temperatures entering; inside adn leaving the cooling tower, cooling tower fan exhaust velocities and thermal images taken from helicopters. The F-Area cooling tower had six cells, some of which were operated with fans off during long periods of the collection. The operating status (fan on or off) for each of the six cells was derived from operations logbooks and added to the collection database. SRNL collected the F-Area cooling tower data to produce a database suitable for validation of a cooling tower model used by one of SRNL's customer agencies. SRNL considers the data to be accurate enough for use in a model validation effort. Also, the thermal images of the cooling tower decks and throats combined with the temperature measurements inside the tower provide valuable information about the appearance of cooling towers as a function of fan operating status and time of day.

  5. Savannah River Site environmental report for 1993

    SciTech Connect

    Arnett, M.W.; Karapatakis, L.K.; Mamatey, A.R.

    1994-08-01

    Savannah River Site (SRS) conducts effluent monitoring and environmental surveillance to ensure the safety of the public and the well-being of the environment. DOE Order 5400,1, ``General Environmental Protection Program,`` requires the submission of an environmental report that documents the impact of facility operations on the environment and on public health. SRS has had an extensive environmental surveillance program in place since 1951 (before site startup). At that time, data generated by the on-site surveillance program were reported in site documents. Beginning in 1959, data from off-site environmental monitoring activities were presented in reports issued for public dissemination. Separate reporting of SRS`s on- and off-site environmental monitoring activities continued until 1985, when data from both surveillance programs were merged into a single public document. The Savannah River Site Environmental Report for 1993 is an overview of effluent monitoring and environmental surveillance activities conducted on and in the vicinity of SRS from January 1 through December 31, 1993. For complete program descriptions, consult the ``SRS Environmental Monitoring Plan`` (WSRC-3Ql-2-1000). It documents the rationale and design criteria for the monitoring program, the frequency of monitoring and analysis, the specific analytical and sampling procedures, and the quality assurance requirements.

  6. 33 CFR 117.911 - Atlantic Intracoastal Waterway, Little River to Savannah River.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., Little River to Savannah River. 117.911 Section 117.911 Navigation and Navigable Waters COAST GUARD... § 117.911 Atlantic Intracoastal Waterway, Little River to Savannah River. (a) General. Public vessels of... List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and...

  7. 33 CFR 117.911 - Atlantic Intracoastal Waterway, Little River to Savannah River.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Little River to Savannah River. 117.911 Section 117.911 Navigation and Navigable Waters COAST GUARD... § 117.911 Atlantic Intracoastal Waterway, Little River to Savannah River. (a) General. Public vessels of... Register citations affecting § 117.911, see the List of CFR Sections Affected, which appears in the...

  8. 33 CFR 117.911 - Atlantic Intracoastal Waterway, Little River to Savannah River.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Little River to Savannah River. 117.911 Section 117.911 Navigation and Navigable Waters COAST GUARD... § 117.911 Atlantic Intracoastal Waterway, Little River to Savannah River. (a) General. Public vessels of... Register citations affecting § 117.911, see the List of CFR Sections Affected, which appears in the...

  9. 33 CFR 117.353 - Atlantic Intracoastal Waterway, Savannah River to St. Marys River.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Savannah River to St. Marys River. 117.353 Section 117.353 Navigation and Navigable Waters COAST GUARD....353 Atlantic Intracoastal Waterway, Savannah River to St. Marys River. (a) General. Public vessels of... Friday, except Federal holidays the draw need open only at 7 a.m., 8 a.m. and 5:30 p.m. (c)...

  10. 33 CFR 117.353 - Atlantic Intracoastal Waterway, Savannah River to St. Marys River.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Savannah River to St. Marys River. 117.353 Section 117.353 Navigation and Navigable Waters COAST GUARD....353 Atlantic Intracoastal Waterway, Savannah River to St. Marys River. (a) General. Public vessels of... Friday, except Federal holidays the draw need open only at 7 a.m., 8 a.m. and 5:30 p.m. (c)...

  11. SAVANNAH RIVER SITE ENVIRONMENTAL REPORT FOR 2008

    SciTech Connect

    Mamatey, A.

    2009-09-15

    The Savannah River Site Environmental Report for 2008 (SRNS-STI-2009-00190) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1A, 'Environment, Safety and Health Reporting,' and DOE Order 5400.5, 'Radiation Protection of the Public and Environment.' The annual SRS Environmental Report has been produced for more than 50 years. Several hundred copies are distributed each year to government officials, universities, public libraries, environmental and civic groups, news media, and interested individuals. The report's purpose is to: (1) present summary environmental data that characterize site environmental management performance; (2) confirm compliance with environmental standards and requirements; and (3) highlight significant programs and efforts.

  12. Savannah River Site environmental data for 1993

    SciTech Connect

    Arnett, M.W.

    1994-05-01

    The figures and tables in this report represent a capsule view of the routine environmental monitoring and surveillance programs at the Savannah River Site. An attempt has been made to include all available data from environmental research programs. The first section of the book is a collection of maps of radiological and nonradiological sampling locations. Also included are general radiological and nonradiological sampling and analysis schedules; a list of the media sampled, along with sample sizes and representative aliquots; a list of the lower limits of detection for radiological detection instruments; the minimum detectable concentrations for gamma analysis of water and air samples; and the minimum detectable concentrations for gamma analysis of soil, food, fish and wildlife, and vegetation samples. Following the first section are data tables containing radiological and nonradiological effluent monitoring results, radiological and nonradiological environmental surveillance results, dose estimates, quality assurance activities, and results of nonroutine occurrences and special surveys.

  13. Savannah River Site environmental data for 1992

    SciTech Connect

    Arnett, M.W.

    1993-09-01

    The figures and tables in this report represent a capsule view of the routine environmental monitoring and surveillance programs at the Savannah River Site. An attempt has been made to include all available data from environmental research programs. The first section of the book is a collection of maps of radiological and nonradiological sampling locations. Also included are general radiological and nonradiological sampling and analysis schedules; a list of the media sampled, along with sample sizes and representative aliquots; a list of the lower limits of detection for radiological detection instruments; the minimum detectable concentrations for gamma analysis of water and air samples; and the minimum detectable concentrations for gamma analysis of soil, food, fish and wildlife, and vegetation samples. Following the first section are data tables containing radiological and nonradiological effluent monitoring results, radiological and nonradiological environmental surveillance results, dose estimates, quality assurance activities, and results of nonroutine occurrences and special surveys.

  14. Savannah River Site Environmental Report for 1994

    SciTech Connect

    Arnett, M.W.; Mamatey, A.; Spitzer, D.

    1994-12-16

    The mission at the Savannah River Site has changed from producing nuclear weapons materials for national defense to managing the waste it has generated, restoring the environment, and enhancing industrial development in and around the site. But no matter what the site`s mission is, it will continue to maintain its comprehensive environmental monitoring and surveillance program. In 1994, effluent monitoring and environmental surveillance were conducted within a 30,000-square-mile area in and around SRS that includes neighboring cities, towns, and counties in Georgia and South Carolina and extends up to 100 miles from the site. Thousands of samples of air, surface water, groundwater, foodstuffs, drinking water, wildlife, rainwater, soil, sediment, and vegetation were collected and analyzed for radioactive and nonradioactive contaminants.

  15. Wildflowers of the Savannah River Site

    SciTech Connect

    Seger, Tona

    2015-08-01

    This guidebook is a resource to help field personnel (nonbotanists) identify plants on the Savannah River Site (SRS) premises. Although not a complete flora guide, this publication contains information about 123 plant species found on the SRS. Plants are listed by their common names and arranged by the color of the flower. The SRS supports a diverse array of plant communities. Land use history, the establishment of the SRS, and current land management practices have shaped the flora presently found on the SRS. Located south of Aiken, SC, SRS spans 198,344 acres with land covering Aiken, Allendale, and Barnwell Counties. Situated on the Upper Coastal Plain and Sandhills physiographic provinces, the SRS has more than 50 distinct soil types. The topography is rolling to flat with elevation ranges from 50 to 400 feet above sea level.

  16. Savannah River Site's Site Specific Plan

    SciTech Connect

    Not Available

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  17. Aqueous processing of actinides at Savannah River

    SciTech Connect

    Gray, J.H.

    1990-01-01

    A number of changes affecting the DP-Complex are having an impact on operations at the Savannah River Site (SRS). In order for SRS to continue as a major contributor within the DP-Complex and remain in position to respond to requests based on new initiatives, programs aimed at redirecting the actinide processing activities have been started. One area undergoing process modifications is F-Canyon, where most of the plutonium feedstocks are processed. Programs already underway that are affecting the dissolution of plutonium materials in canyon dissolvers and the purification of aqueous streams in the second plutonium solvent extraction cycle are discussed. Issues influencing program direction involve environmental concerns, waste minimization, health protection, storage limitations, and material recycle. Each of these issues is discussed in relation to operations in F-Canyon and results based on initial development studies are presented.

  18. Savannah River Site environmental report for 1989

    SciTech Connect

    Cummins, C.L.; Martin, D.K.; Todd, J.L.

    1989-01-01

    this volume of Savannah River Site Environmental Report for 1989 (WSRC-IM-90-60) contains the figures and tables referenced in Volume I. The figures contain graphic illustrations of sample locations and/or data. The tables present summaries of the following types of data federal and state standards and guides applicable to SRS operations; concentrations of radioactivity in environmental media; the quantity of radioactivity released to the environment from SRS operations; offsite radiation committed dose from SRS operations; measurements of physical properties, chemicals, and metals concentrations in environmental media; and interlaboratory comparison of analytical results. The figures and tables in this report contain information about the routine environmental monitoring program at SRS unless otherwise indicated. No attempt has been made to include all data from environmental research programs. Variations in the report's content from year to year reflect changes in the routine environmental monitoring program or the inability to obtain certain samples from a specific location. 42 figs., 188 tabs.

  19. Savannah River Site ALARA Program appraisals

    SciTech Connect

    Johnson, J.R.

    1992-01-01

    ALARA Program audits are recommended in PNL-6566, Health Physics Manual of Good Practices for Reducing Radiation Exposure to Levels that are As Low As Reasonably Achievable (ALARA).'' The Department of Energy (DOE) Order 5480.11, Radiation Protection For Occupational Workers,'' requires contractors to conduct internal audits of all functional elements of the radiological protection program, which includes the ALARA program, as often as necessary, but at a minimum every three years. At the Savannah River Site (SRS), these required audits are performed as part of the Health Protection Internal Appraisal Program. This program was established to review the Site radiological protection program, which includes the ALARA program, on an ongoing basis and to provide recommendations for improvement directly to senior Health Protection management. This paper provides an overview of the SRS Health Protection Internal Appraisal program. In addition, examples of specific performance criteria and detailed appraisal guidelines used ALARA appraisals are provided.

  20. Savannah River Site ALARA Program appraisals

    SciTech Connect

    Johnson, J.R.

    1992-06-01

    ALARA Program audits are recommended in PNL-6566, ``Health Physics Manual of Good Practices for Reducing Radiation Exposure to Levels that are As Low As Reasonably Achievable (ALARA).`` The Department of Energy (DOE) Order 5480.11, ``Radiation Protection For Occupational Workers,`` requires contractors to conduct internal audits of all functional elements of the radiological protection program, which includes the ALARA program, as often as necessary, but at a minimum every three years. At the Savannah River Site (SRS), these required audits are performed as part of the Health Protection Internal Appraisal Program. This program was established to review the Site radiological protection program, which includes the ALARA program, on an ongoing basis and to provide recommendations for improvement directly to senior Health Protection management. This paper provides an overview of the SRS Health Protection Internal Appraisal program. In addition, examples of specific performance criteria and detailed appraisal guidelines used ALARA appraisals are provided.

  1. Savannah River Site environmental report for 1989

    SciTech Connect

    Cummins, C.L.; Martin, D.K.; Todd, J.L.

    1989-01-01

    The purpose of this report is to meet three of the primary objectives of the Savannah River Site (SRS) environmental monitoring program. These objectives are to assess actual or potential exposures to populations form the presence of radioactive and nonradioactive materials from normal operations or nonroutine occurrences; to demonstrate compliance with applicable authorized limits and legal requirements; and to communicate results of the monitoring program to the public. This 1989 report contains descriptions of radiological and nonradiological monitoring programs, it provides data obtained from these programs, and it describes various environmental research activities ongoing at the site. Also included are summaries of environmental management and compliance activities, a summary of National Environmental Policy Act activities, and a listing of environmental permits issued by regulatory agencies.

  2. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect

    Not Available

    1992-01-10

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1991 EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1991 are listed in this report.

  3. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect

    Not Available

    1990-10-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the first quarter of 1990. It includes the analytical data, field data, well activity data, and the other documentation for this program and provides a record of the program's activities and rationale and an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of the analytical data and other data, maintenance of the databases containing groundwater monitoring data and related data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  4. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect

    Not Available

    1991-06-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  5. Savannah River Site generic data base development

    SciTech Connect

    Blanton, C.H.; Eide, S.A.

    1993-06-30

    This report describes the results of a project to improve the generic component failure data base for the Savannah River Site (SRS). A representative list of components and failure modes for SRS risk models was generated by reviewing existing safety analyses and component failure data bases and from suggestions from SRS safety analysts. Then sources of data or failure rate estimates were identified and reviewed for applicability. A major source of information was the Nuclear Computerized Library for Assessing Reactor Reliability, or NUCLARR. This source includes an extensive collection of failure data and failure rate estimates for commercial nuclear power plants. A recent Idaho National Engineering Laboratory report on failure data from the Idaho Chemical Processing Plant was also reviewed. From these and other recent sources, failure data and failure rate estimates were collected for the components and failure modes of interest. This information was aggregated to obtain a recommended generic failure rate distribution (mean and error factor) for each component failure mode.

  6. Thermodynamic Modeling of Savannah River Evaporators

    SciTech Connect

    Weber, C.F.

    2001-08-02

    A thermodynamic model based on the code SOLGASMIX is developed to calculate phase equilibrium in evaporators and related tank wastes at the Savannah River Site (SRS). This model uses the Pitzer method to calculate activity coefficients, and many of the required Pitzer parameters have been determined in the course of this work. Principal chemical species in standard SRS simulant solutions are included, and the temperature range for most parameters has been extended above 100 C. The SOLGASMIX model and calculations using the code Geochemists Workbench are compared to actual solubility data including silicate, aluminate, and aluminosilicate solutions. In addition, SOLGASMIX model calculations are also compared to transient solubility data involving SRS simulant solutions. These comparisons indicate that the SOLGASMIX predictions closely match reliable data over the range of temperature and solution composition expected in the SRS evaporator and related tanks. Predictions using the Geochemists Workbench may be unreliable, due primarily to the use of an inaccurate activity coefficient model.

  7. Deer monitoring at the Savannah River Site

    SciTech Connect

    Fledderman, P.D.

    1992-01-01

    To protect public health, all deer and feral hogs harvested at the Savannah River Site (SRS) during controlled hunts are monitored for Cs-137. A new monitoring program has been developed by the Environmental Monitoring Section (EMS). To provide increased confidence in dose data and compliance with regulations, many changes have been made to the deer and hog monitoring program. Using field count information, a computerized database determines Cs-137 concentration and calculates the committed effective dose equivalent (CEDE) resulting from consumption of the animal. The database then updates each hunter's cumulative CEDE in real time. Also, enhancements to the instrument calibration and quality control portions of the monitoring program were implemented. These include improved monitor calibration, intercomparison of field results from the same animal using different detectors, and regular use of check sources to verify equipment performance. With these program changes, EMS can produce more accurate and verifiable dose data.

  8. Deer monitoring at the Savannah River Site

    SciTech Connect

    Fledderman, P.D.

    1992-10-01

    To protect public health, all deer and feral hogs harvested at the Savannah River Site (SRS) during controlled hunts are monitored for Cs-137. A new monitoring program has been developed by the Environmental Monitoring Section (EMS). To provide increased confidence in dose data and compliance with regulations, many changes have been made to the deer and hog monitoring program. Using field count information, a computerized database determines Cs-137 concentration and calculates the committed effective dose equivalent (CEDE) resulting from consumption of the animal. The database then updates each hunter`s cumulative CEDE in real time. Also, enhancements to the instrument calibration and quality control portions of the monitoring program were implemented. These include improved monitor calibration, intercomparison of field results from the same animal using different detectors, and regular use of check sources to verify equipment performance. With these program changes, EMS can produce more accurate and verifiable dose data.

  9. Savannah River Site Environmental Implementation Plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  10. Advanced separations at Savannah River site

    SciTech Connect

    Thompson, M.C.

    1997-10-01

    The Savannah River Site (SRS) has many waste streams that are contaminated with radionuclides and/or hazardous materials that must be treated to remove the radioactivity (Cs, Sr, tritium, actinides) and hazardous components (poly-chlorinated biphenyls [PCBs], cyanide, metal ions). This task provides testbeds for ESP-developed materials and technology using actual SRS waste streams. The work includes different SRS waste streams: high-level waste (HLW) solutions currently stored in underground tanks onsite, water recycled from the waste vitrification plant, groundwater and other aqueous streams contaminated with metal ions and radionuclides, and reactor basin water in excess facilities. Another part of this task is to provide a report on materials for Cs removal from aqueous solutions for use as a reference.

  11. Interim report of the Savannah River macroinvertebrate and periphyton studies

    SciTech Connect

    Specht, W.L.; Kania, H.J.; Painter, W.B.

    1983-09-01

    A total of 231,421 macroinvertebrates were collected from Hester Dendy multiplate samplers placed at five locations in the Savannah River and three tributary streams (Upper Three Runs Creek, Four Mile Creek and Steel Creek) between September 1982 and March 1983. Forty-nine taxonomic groups, including 41 insect families and 8 non-insect taxa were collected from the samplers. The creeks contained significantly fewer invertebrate taxa and lower densities of macroinvertebrates than did the river. More invertebrate taxa, but lower densities of organisms were collected from bottom Hester Dendy samplers than from those placed near the surface. No significant differences were found between the macroinvertebrate communities of samplers placed near the South Carolina or Georgia banks of the river. No substantive conclusions can be drawn from the first six months of periphyton data from sampling locations in the Savannah River. However, data from the creeks indicate that thermal discharges into Four Mile Creek stimulate periphyton production during the winter months. 17 references, 8 figures, 3 tables.

  12. Ichthyoplankton entrainment study at the SRS Savannah River water intakes for Westinghouse Savannah River Company. Final report

    SciTech Connect

    Paller, M.

    1992-03-26

    Cooling water for L and K Reactors and makeup water for Par Pond is pumped from the Savannah River at the 1G, 3G, and 5G pump houses. Ichthyoplankton (drifting fish larvae and eggs) from the river are entrained into the reactor cooling systems with the river water and passed through the reactor`s heat exchangers where temperatures may reach 70{degrees}C during full power operation. Ichthyoplankton mortality under such conditions is assumed to be 100 percent. The number of ichthyoplankton entrained into the cooling system depends on a variety of variables, including time of year, density and distribution of ichthyoplankton in the river, discharge levels in the river, and the volume of water withdrawn by the pumps. Entrainment at the 1 G pump house, which is immediately downstream from the confluence of Upper Three Runs Creek and the Savannah River, is also influenced by discharge rates and ichthyoplankton densities in Upper Three Runs Creek. Because of the anticipated restart of several SRS reactors and the growing concern surrounding striped bass and American shad stocks in the Savannah River, the Department of Energy requested that the Environmental Sciences Section (ESS) of the Savannah River Laboratory sample ichthyoplankton at the SRS Savannah River intakes. Dams & Moore, Inc., under a contract with Westinghouse Savannah River Company performed the sampling and data analysis for the ESS.

  13. Savannah River Site generic data base development

    SciTech Connect

    Blanchard , A.

    2000-01-04

    This report describes the results of a project to improve the generic component failure database for the Savannah River Site (SRS). Additionally, guidelines were developed further for more advanced applications of database values. A representative list of components and failure modes for SRS risk models was generated by reviewing existing safety analyses and component failure data bases and from suggestions from SRS safety analysts. Then sources of data or failure rate estimates were identified and reviewed for applicability. A major source of information was the Nuclear Computerized Library for Assessing Reactor Reliability, or NUCLARR. This source includes an extensive collection of failure data and failure rate estimates for commercial nuclear power plants. A recent Idaho National Engineering Laboratory report on failure data from the Idaho Chemical Processing Plant was also reviewed. From these and other recent sources, failure data and failure rate estimates were collected for the components and failure modes of interest. For each component failure mode, this information was aggregated to obtain a recommended generic failure rate distribution (mean and error factor based on a lognormal distribution). Results are presented in a table in this report. A major difference between generic database and previous efforts is that this effort estimates failure rates based on actual data (failure events) rather than on existing failure rate estimates. This effort was successful in that over 75% of the results are now based on actual data. Also included is a section on guidelines for more advanced applications of failure rate data. This report describes the results of a project to improve the generic component failure database for the Savannah River site (SRS). Additionally, guidelines were developed further for more advanced applications of database values.

  14. SAVANNAH RIVER SITE ENVIRONMENTAL REPORT FOR 2010

    SciTech Connect

    Mamatey, A.; Dunaway-Ackerman, J.

    2011-08-16

    This report was prepared in accordance with U.S. Department of Energy (DOE) Order 231.1A, 'Environment, Safety and Health Reporting,' to present summary environmental data for the purpose of: (a) characterizing site's environmental management performance; (b) summarizing environmental occurrences and responses reported during the calendar year; (c) describing compliance status with respect to environmental standards and requirements; and (d) highlighting significant site programs and efforts. This report is the principal document that demonstrates compliance with the requirements of DOE Order 5400.5, 'Radiation Protection of the Public and the Environment,' and is a key component of DOE's effort to keep the public informed of environmental conditions at Savannah River Site (SRS). SRS has four primary missions: (1) Environmental Management - Cleaning up the legacy of the Cold War efforts and preparing decommissioned facilities and areas for long-term stewardship; (2) Nuclear Weapons Stockpile Support - Meeting the needs of the U.S. nuclear weapons stockpile through the tritium programs of the National Nuclear Security Administration (NNSA); (3) Nuclear Nonproliferation Support - Meeting the needs of the NNSA's nuclear nonproliferation programs by safely storing and dispositioning excess special nuclear materials; and (4) Research and Development - Supporting the application of science by the Savannah River National Laboratory (SRNL) to meet the needs of SRS, the DOE complex, and other federal agencies During 2010, SRS worked to fulfill these missions and position the site for future operations. SRS continued to work with the South Carolina Department of Health and Environmental Control (SCDHEC), the Environmental Protection Agency (EPA), and the Nuclear Regulatory Commission to find and implement solutions and schedules for waste management and disposition. As part of its mission to clean up the Cold War legacy, SRS will continue to address the highest-risk waste

  15. Rheology of Savannah River site tank 42 HLW radioactive sludge

    SciTech Connect

    Ha, B.C.

    1997-11-05

    Knowledge of the rheology of the radioactive sludge slurries at the Savannah River Site is necessary in order to ensure that they can be retrieved from waste tanks and processed for final disposal. At Savannah River Site, Tank 42 sludge represents on of the first HLW radioactive sludges to be vitrified in the Defense Waste Processing Facility. The rheological properties of unwashed Tank 42 sludge slurries at various solids concentrations were measured remotely in the Shielded Cells at the Savannah River Technology Center using a modified Haake Rotovisco viscometer.

  16. Uranium waste disposal at the Savannah River Site

    SciTech Connect

    Cook, J.R.; McDonell, W.R.; Wilhite, E.L.

    1990-01-01

    The Savannah River Site generates waste containing depleted, natural, and enriched uranium residue. The past and current practice for disposal of this waste at the Savannah River Site have been assessed using radionuclide pathway analysis to estimate environmental impact of closure alternatives for existing disposal sites, and to assist in the development of improved disposal facilities in the near future. This paper outlines the status of uranium waste management technology as currently practiced to maintain the environmental impact within an acceptable limit at the Savannah River Site, and indicates those steps being taken to improve future operations.

  17. Uranium waste disposal at the Savannah River Site

    SciTech Connect

    Cook, J.R.; McDonell, W.R.; Wilhite, E.L.

    1990-12-31

    The Savannah River Site generates waste containing depleted, natural, and enriched uranium residue. The past and current practice for disposal of this waste at the Savannah River Site have been assessed using radionuclide pathway analysis to estimate environmental impact of closure alternatives for existing disposal sites, and to assist in the development of improved disposal facilities in the near future. This paper outlines the status of uranium waste management technology as currently practiced to maintain the environmental impact within an acceptable limit at the Savannah River Site, and indicates those steps being taken to improve future operations.

  18. Savannah River restart Peer Evaluation Program examination report

    SciTech Connect

    Morgan, M.P.

    1990-11-01

    During the period of August 13, 1990 through September 14, 1990 the Savannah River Peer Evaluation Program was administered to forty-eight certified Central Control Room Operators and Supervisors assigned to the K Reactor, on the Savannah River Site (SRS). This examination was conducted in response to recommendations made by the Defense Nuclear Facilities Safety Board. The examination process was administered by Westinghouse-Savannah River Company (WSRC) and evaluated in parallel by WSRC Peer Evaluators and Training Evaluators from Department of Energy (DOE). A detailed discussion of the examination development and administration methodology is provided in appendices. 4 tabs.

  19. Savannah River Technology Center. Monthly report, May 1993

    SciTech Connect

    Not Available

    1993-05-01

    This report covers the progress and accomplishments made at the Savannah River Technology Center for the month of May 1993. Progress is reported for projects in the following areas: reactors, tritium, separations, environmental, waste management, and general. General projects are: an eight week tutorial of the Los Alamos National Laboratory developed Monte Carlo Neutron Photon (MCNP) code; development of materials and fabrication technologies for the spallation and tritium targets for the accelerator production of tritium; and a program to develop welding methods to repair stainless steel containing helium.

  20. Laboratory robotics systems at the Savannah River Laboratory

    SciTech Connect

    Dyches, G M; Burkett, S D

    1983-01-01

    Many analytical chemistry methods normally used at the Savannah River site require repetitive procedures and handling of radioactive and other hazardous solutions. Robotics is being investigated as a method of reducing personnel fatigue and radiation exposure and also increasing product quality. Several applications of various commercially available robot systems are discussed involving cold (nonradioactive) and hot (radioactive) sample preparations and glovebox waste removal. Problems encountered in robot programming, parts fixturing, design of special robot hands and other support equipment, glovebox operation, and operator-system interaction are discussed. A typical robot system cost analysis for one application is given.

  1. Adverse experiences with nitric acid at the Savannah River Site

    SciTech Connect

    Durant, W.S.; Craig, D.K.; Vitacco, M.J.; McCormick, J.A.

    1991-06-01

    Nitric acid is used routinely at the Savannah River Site (SRS) in many processes. However, the site has experienced a number of adverse situations in handling nitric acid. These have ranged from minor injuries to personnel to significant explosions. This document compiles many of these events and includes discussions of process upsets, fires, injuries, and toxic effects of nitric acid and its decomposition products. The purpose of the publication is to apprise those using the acid that it is a potentially dangerous material and can react in many ways as demonstrated by SRS experience. 10 refs.

  2. Striped Bass Spawning in Non-Estuarine Portions of the Savannah River

    SciTech Connect

    Martin, D.; Paller, M.

    2007-04-17

    Historically, the estuarine portions of the Savannah River have been considered to be the only portion of the river in which significant amounts of striped bass (Morone saxatilis) spawning normally occur. A reexamination of data from 1983 through 1985 shows a region between River Kilometers 144 and 253 where significant numbers of striped bass eggs and larvae occur with estimated total egg production near that currently produced in the estuarine reaches. It appears possible that there are two separate spawning populations of striped bass in the Savannah River.

  3. Historic view entitled "FORT PULASKI (/) MOUTH OF SAVANNAH RIVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Historic view entitled "FORT PULASKI (/) MOUTH OF SAVANNAH RIVER AND TYBEE ISLAND, GA.," of 48th NY infantry on the south wall looking to the southeast corner (note: cockspur beacon in near background and Tybee Island in far background) - Fort Pulaski, Cockspur Island, Savannah, Chatham County, GA

  4. Assessment of Radionuclides in the Savannah River Site Environment Summary

    SciTech Connect

    Carlton, W.H.

    1999-01-26

    This document summarizes the impact of radionuclide releases from Savannah River Site (SRS) facilities from 1954 through 1996. The radionuclides reported here are those whose release resulted in the highest dose to people living near SRS.

  5. FACILITY DEACTIVATION AND DECOMMISSIONING AT THE SAVANNAH RIVER SITE

    SciTech Connect

    Gilmour, J; William Austin, W; Cathy Sizemore, C

    2007-01-31

    In February 2002, the U.S. Department of Energy initiated actions to expedite Cleanup, focus on significant and early risk reduction, and reduce costs at the Savannah River Site (SRS). In response SRS started on a project focused on completing the decommissioning of inactive facilities in T, D, and M Areas, areas that on the perimeter of the Site, by the end of 2006. In June 2003, the Department of Energy Savannah River Operations Office (DOE-SR), the South Carolina Department of Health and Environmental Control (SCDHEC), and the Environmental Protection Agency, Region 4 (EPA-4) endorsed a Memorandum of Agreement (MOA) concerning cleanup at the Savannah River Site (SRS). The vision of the Agreement is that SRS will reduce its operations footprint to establish a buffer zone at the perimeter if the Site, while the central core area of the Site will be reserved for continuing or future long-term operations. DOE-SR, EPA-4, and SCDHEC agreed that establishing this buffer zone and appropriately sequencing environmental restoration and decommissioning activities can lead to greater efficiency and accelerate completion of entire site areas. This vision is embodied in the concept of Area Completion--which integrated operations, deactivation and decommissioning (D&D), and soils and groundwater cleanup into a time-phased approach to completing all the work necessary to address the Cold War legacy. D&D addresses the ''footprint'' of the building or structure, while the soils and groundwater project addresses any environmental remediation that may be required in the underlying and surrounding soils and groundwater. Since then, {approx}250 facilities have been decommissioned at the SRS, ranging from guard stations to nuclear fuel production facilities.

  6. SAVANNAH RIVER SITE ENVIRONMENTAL REPORT FOR 2009

    SciTech Connect

    Mamatey, A.; Fanning, R.

    2010-08-19

    The Savannah River Site Environmental Report for 2009 (SRNS-STI-2010-00175) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1A,'Environment, Safety and Health Reporting,' and DOE Order 5400.5, 'Radiation Protection of the Public and Environment.' The annual SRS Environmental Report has been produced for more than 50 years. Several hundred copies are distributed each year to government officials, universities, public libraries, environmental and civic groups, news media, and interested individuals. The report's purpose is to: (1) present summary environmental data that characterize site environmental management performance; (2) confirm compliance with environmental standards and requirements; and (3) highlight significant programs and efforts. SRS maintained its record of environmental excellence in 2009, as its operations continued to result in minimal impact to the offsite public and the surrounding environment. The site's radioactive and chemical discharges to air and water were well below regulatory standards for environmental and public health protection; its air and water quality met applicable requirements; and the potential radiation dose from its discharges was less than the national dose standards. The largest radiation dose that an offsite, hypothetical, maximally exposed individual could have received from SRS operations during 2009 was estimated to be 0.12 millirem (mrem). (An mrem is a standard unit of measure for radiation exposure.) The 2009 SRS dose is just 0.12 percent of the DOE all-pathway dose standard of 100 mrem per year, and far less than the natural average dose of about 300 mrem per year (according to Report No. 160 of the National Council of Radiation Protection and Measurements) to people in the United States. This 2009 all-pathway dose of 0.12 mrem was the same as the 2008 dose. Environmental monitoring is conducted extensively within a 2,000-square-mile network extending 25 miles from SRS

  7. ROUGHNESS LENGTHS FOR THE SAVANNAH RIVER SITE

    SciTech Connect

    Hunter, C.

    2012-03-28

    Surface roughness values for the areas surrounding the H, D and N-Area meteorological towers were computed from archived 2010 meteorological data. These 15-minute-averaged data were measured with cup anemometers and bidirectional wind vanes (bivanes) 61 m above the surface. The results of the roughness calculation using the standard deviation of elevation angle {sigma}{sub E}, and applying the simple formula based on tree canopy height, gave consistent estimates for roughness around the H-Area tower in the range of 1.76 to 1.86 m (95% confidence interval) with a mean value of 1.81 m. Application of the {sigma}{sub E} method for the 61-m level at D and N-Areas gave mean values of 1.71 and 1.81 with confidence ranges of 1.62-1.81 and 1.73-1.88 meters, respectively. Roughness results are azimuth dependent, and thus are presented as averages over compass sectors spanning 22.5 degrees. Calculated values were compared to other methods of determining roughness, including the standard deviation of the azimuth direction, {sigma}{sub A}, and standard deviation of the wind speed, {sigma}{sub U}. Additional data was obtained from a sonic anemometer at 61-m on the H-Area tower during a period of a few weeks in 2010. Results from the sonic anemometer support our use of {sigma}{sub E} to calculate roughness. Based on the H-Area tower results, a surface roughness of 1.8 m using is recommended for use in dispersion modeling applications that consider the impacts of a contaminant release to individuals along the Site boundary. The canopy surrounding the H-Area tower is relatively uniform (i.e., little variance in roughness by upwind direction), and data supplied by the U.S. Forest Service at Savannah River show that the canopy height and composition surrounding the H-Area tower is reasonably representative of forested areas throughout the SRS reservation. For dispersion modeling analyses requiring assessments of a co-located worker within the respective operations area, recommended

  8. Applications of inductively coupled plasma-mass spectrometry to the determination of actinides and fission products in high level radioactive wastes at the Savannah River Site

    SciTech Connect

    Kinard, W.F.; Bibler, N.E.; Coleman, C.J.; Dewberry, R.A.; Boyce, W.T.; Wyrick, S.B.

    1995-12-31

    Four years of experience in applying inductively coupled plasma-mass spectrometry (ICP-MS) to the analysis of actinides and fission products in high level waste (HLW) samples at the Savannah River Site has led to the development of a number of techniques to aid in the interpretation of the mass spectral data. The goal has been to develop rapid and reliable analytical procedures that provide the necessary chemical and isotopic information to answer the process needs of the customers. Techniques that have been developed include the writing of computer software to strip the experimental data from the instrumental data files into spreadsheets or into a spectral data processing package so that the raw mass spectra can be overlain for comparison or plotted with higher output resolution. These procedures have been applied to problems ranging from the analysis of the high level waste tanks to reactor moderator water as well as environmental samples. Criticality safety analyses in some HLW waste treatment processes depend upon actinide concentration and isotopic information generated by ICP-MS, particularly in tanks with high concentrations of {sup 137}Cs and {sup 90}Sr. Experimental results for a number of these applications will be presented. These procedures represent a considerable saving in time and expense as compared to conventional chemical separation followed by radiochemical analyses, as well as decreased radiation exposure for the analysts.

  9. Savannah River Site L reactor testing

    SciTech Connect

    Menna, J.D.; Whitehouse, J.C.

    1990-01-01

    Flow tests were conducted in the Savannah River Site L reactor to evaluate the performance of the primary coolant system under simulated Loss of Coolant Accident (LOCA) conditions. Results were obtained with a prototypic cold fuel charge in the core. Core flows typical of normal and shutdown operation were studied. The tests consisted of measuring hydraulic parameters while lowering tank moderator levels to allow air entrainment from the reactor tank through operating coolant pumps. Data were collected continuously as the flows changed from single-phase to a two-component mixture of water and air. Minimum tank levels equivalent to those resulting from a hypothetical double-ended guillotine break of a coolant pipe were simulated. System pressures, water levels, densities, flows, and pump parameters were measured by over 200 instruments especially designed or adapted for in-reactor use. Special in-reactor video cameras provided visual observation of flow regimes and confirmed water levels in the reactor tank, plenum, and pump suction and plenum inlet pipes. The tests provided a unique opportunity to study full-scale pump degradation and two-component flow distributions in the reactor under ambient temperature conditions. Results showed the different pump operating regimes and points of transition and some of the other key features of the reactor response system during a severe loss of coolant event. 4 refs., 24 figs.

  10. Savannah River Site Annual Meteorology Report 2003

    SciTech Connect

    HUNTER, CHARLESH.

    2004-04-30

    Summaries of meteorological observations collected at the Savannah River Site (SRS) in 2003 reveal a year that was unusually cool and wet. The annual rainfall of 61.2 inches was the third highest of all the years in a period of record that began in 1952. Higher amounts were recorded only in 1964 (73.5 in) and 1971 (68.2 in). Rainfall of 0.01 inch or more occurred on 119 days during the year. Furthermore, the annual average temperature of 62.2 degrees Fahrenheit was the coldest of any year in an available record that dates to 1964. Cool and wet conditions were most pronounced in the spring and summer months. Unusually cold weather also occurred in January and December. The coldest temperature for the year was 12.5 degrees Fahrenheit (Jan 24) and the warmest temperature was 92.4 degrees Fahrenheit (Aug 27). There were no significant occurrences of severe weather (ice/snow, tornado, sustained high wind) during the year. The heavy rain that occurred on April 7 (3.5 inches) was due to an active stationary front over the area and strong southwesterly wind aloft. The remnants of Tropical Storm Bill produced 2.36 inches of rain on July 1. Hurricane Isabelle, which struck the North Carolina coast mid September, did not have a significant affect on the SRS. A thunderstorm on May 3 produced a surface (4-meter) wind gust of 41.7 miles per hour.

  11. Savannah River Site environmental report for 1988

    SciTech Connect

    Cummins, C.L.; Hetrick, C.S.; Stevenson, D.A.; Davis, H.A.; Martin, D.K.; Todd, J.L.

    1989-01-01

    During 1988, as in previous years, Savannah River Site operations had no adverse impact on the general public or the environment. Based on the SRS site-specific code, the maximum radiation dose commitment to a hypothetical individual at the SRS boundary from 1988 SRS atmospheric releases of radioactive materials was 0.46 millirem (mrem) (0.0046 millisievert (mSv)). To obtain the maximum dose, an individual would have had to reside on the SRS boundary at the location of highest dose for 24 hours per day, 365 days per year, consume a maximum amount of foliage and meat which originated from the general vicinity of the plant boundary, and drink a maximum amount of milk from cows grazing at the plant boundary. The average radiation dose commitment from atmospheric releases to the hypothetical individual on the SRS boundary in 1988 was 0.18 mrem (0. 0018 mSv). This person, unlike the maximumly exposed individual, consumes an average amount of foliage, meat, and milk which originated from the foliage and animals living at the plant boundary.

  12. The Savannah River Site's groundwater monitoring program

    SciTech Connect

    Not Available

    1991-05-06

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1990 (July through September) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. All analytical results from third quarter 1990 are listed in this report, which is distributed to all site custodians. One or more analytes exceeded Flag 2 in 87 monitoring well series. Analytes exceeded Flat 2 for the first since 1984 in 14 monitoring well series. In addition to groundwater monitoring, EPD/EMS collected drinking water samples from SRS drinking water systems supplied by wells. The drinking water samples were analyzed for radioactive constituents.

  13. Tritium in the Savannah River Site environment

    SciTech Connect

    Murphy, C.E. Jr.; Bauer, L.R.; Hayes, D.W.; Marter, W.L.; Zeigler, C.C.; Stephenson, D.E.; Hoel, D.D.; Hamby, D.M.

    1991-05-01

    Tritium is released to the environment from many of the operations at the Savannah River Site. The releases from each facility to the atmosphere and to the soil and streams, both from normal operations and inadvertent releases, over the period of operation from the early 1950s through 1988 are presented. The fate of the tritium released is evaluated through environmental monitoring, special studies, and modeling. It is concluded that approximately 91% of the tritium remaining after decay is now in the oceans. A dose and risk assessment to the population around the site is presented. It is concluded that about 0.6 fatal cancers may be associated with the tritium released during all the years of operation to the population of about 625,000. This same population (based on the overall US cancer statistics) is expected to experience about 105,000 cancer fatalities from all types of cancer. Therefore, it is considered unlikely that a relationship between any of the cancer deaths occurring in this population and releases of tritium from the SRS will be found.

  14. Savannah River Site Environmental Report for 2003

    SciTech Connect

    A. MAMATEY

    2003-01-01

    The ''Savannah River Site Environmental Report for 2003'' (WSRC-TR-2004-00015) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1, ''Environment, Safety and Health Reporting'', and DOE Order 5400.5, ''Radiation Protection of the Public and Environment''. The report's purpose is to: (1) present summary environmental data that characterize site environmental management performance; (2) confirm compliance with environmental standards and requirements; (3) highlight significant programs and efforts; and (4) assess the impact of SRS operations on the public and the environment. This year's report reflects a continuing effort (begun in 2001) to streamline the document and thereby increase its cost effectiveness--without omitting valuable technical data. To that end each author will continue to work toward presenting results in summary fashion, focusing on historical trends. Complete data tables again are included on the CD inside the back cover of the report. The CD also features an electronic version of the report; an appendix of site, environmental sampling location, dose, and groundwater maps; and complete 2003 reports from a number of other SRS organizations.

  15. SAVANNAH RIVER NATIONAL LABORATORYREGENERATIVE FUEL CELL PROJECT

    SciTech Connect

    Motyka, T

    2008-11-11

    A team comprised of governmental, academic and industrial partners led by the Savannah River National Laboratory developed and demonstrated a regenerative fuel cell system for backup power applications. Recent market assessments have identified emergency response and telecommunication applications as promising near-term markets for fuel cell backup power systems. The Regenerative Fuel Cell System (RFC) consisted of a 2 kg-per-day electrolyzer, metal-hydride based hydrogen storage units and a 5 kW fuel cell. Coupling these components together created a system that can produce and store its own energy from the power grid much like a rechargeable battery. A series of test were conducted to evaluate the performance of the RFC system under both steady-state and transit conditions that might be encountered in typical backup power applications. In almost all cases the RFC functioned effectively. Test results from the demonstration project will be used to support recommendations for future fuel cell and hydrogen component and system designs and support potential commercialization activities. In addition to the work presented in this report, further testing of the RFC system at the Center for Hydrogen Research in Aiken County, SC is planned including evaluating the system as a renewable system coupled with a 20kW-peak solar photovoltaic array.

  16. Savannah River Site. Environmental report for 2001

    SciTech Connect

    Arnett, Margaret W.; Mamatey, Albert R.

    2001-12-31

    The goal of the Savannah River Site (SRS)—and that of the U.S. Department of Energy (DOE)—is positive environmental stewardship and full regulatory compliance, with zero violations. The site’s employees maintained progress toward achievement of this goal in 2001, as demonstrated by examples in this chapter. The site’s compliance efforts were near-perfect again in 2001. No notices of violation (NOVs) were issued in 2001 under the Resource Conservation and Recovery Act (RCRA), the Safe Drinking Water Act (SDWA), or the Clean Water Act (CWA). Two NOVs were issued to SRS during 2001—one, associated with permit requirement compliance, was issued under the Clean Air Act (CAA); the other, related to an oil release, was issued under the South Carolina Pollution Control Act. Under the CWA, the site’s National Pollutant Discharge Elimination System (NPDES) compliance rate was 99.6 percent. Also, 274 National Environmental Policy Act (NEPA) reviews of newly proposed actions were conducted and formally documented in 2001, and only one of the year’s 799 Site Item Reportability and Issues Management (SIRIM) program-reportable events was categorized as environmental; it was classified as an off-normal event.

  17. Savannah River Site DNAPL technical program plan

    SciTech Connect

    Jordan, J.E.; Looney, B.B.; Rossabi, J.; Bergren, C.L.

    1993-12-31

    This document was developed by the environmental remediation and technology development organizations at the Savannah River Site (SRS) and is the Site technical program plan to address the remediation of residual chlorinated hydrocarbon solvents in the groundwater and the soil. These solvents are often labeled dense nonaqueous phase liquids (DNAPLs). At SRS, the primary DNAPL constituents of concern are trichloroethylene (TCE) and tetrachloroethylene (PCE); two commonly used industrial organic solvents. The goal of the technical program plan is to provide clear objectives for DNAPL characterization and remediation activities at SRS. Developed by a task team of researchers at SRS, the objectives and program description document a coordinated, programmatic approach to identify solutions to the complex problem of DNAPL contamination. The purposes of this program are to expedite the development and application of technologies for DNAPL characterization and remediation, to provide a well characterized {open_quotes}real{close_quotes} site to perform the work, and to facilitate DNAPL remediation at SRS. Given the appropriate resources, SRS will provide an intelligent application of technical skills and confidence toward the remediation of DNAPLS. We have completed an initial characterization of DNAPLs that provides unique data on the location, nature, and extent of DNAPL occurrences at a field site. Future activities will leverage the initial characterization data for DNAPLs at SRS to demonstrate efficient progression through the characterization phase leading to cleanup. The initial characterization data provides a tool to focus this program`s activities. As a result, solutions to the complex problem of DNAPL contamination will be tested and demonstrated in the most cost-effective manner. Where appropriate, the program will rely on identifying and utilizing innovative technologies developed by industry and universities.

  18. Natural Remediation at Savannah River Site

    SciTech Connect

    Lewis, C. M.; Van Pelt, R.

    2002-02-25

    Natural remediation is a general term that includes any technology or strategy that takes advantage of natural processes to remediate a contaminated media to a condition that is protective of human health and the environment. Natural remediation techniques are often passive and minimally disruptive to the environment. They are generally implemented in conjunction with traditional remedial solutions for source control (i.e., capping, stabilization, removal, soil vapor extraction, etc.). Natural remediation techniques being employed at Savannah River Site (SRS) include enhanced bio-remediation, monitored natural attenuation, and phytoremediation. Enhanced bio-remediation involves making nutrients available and conditions favorable for microbial growth. With proper precautions and feeding, the naturally existing microbes flourish and consume the contaminants. Case studies of enhanced bio-remediation include surface soils contaminated with PCBs and pesticides, and Volatile Organic Compound (VOC) contamination in both the vadose zone and groundwater. Monitored natural attenuation (MNA) has been selected as the preferred alternative for groundwater clean up at several SRS waste units. Successful implementation of MNA has been based on demonstration that sources have been controlled, groundwater modeling that indicates that plumes will not expand or reach surface water discharge points at levels that exceed regulatory limits, and continued monitoring. Phytoremediation is being successfully utilized at several SRS waste units. Phytoremediation involves using plants and vegetation to uptake, break down, or manage contaminants in groundwater or soils. Case studies at SRS include managing groundwater plumes of tritium and VOCs with pine trees that are native to the area. Significant decreases in tritium discharge to a site stream have been realized in one phytoremediation project. Studies of other vegetation types, methods of application, and other target contaminants are

  19. THE TRITIUM UNDERFLOW STUDY AT THE SAVANNAH RIVER SITE

    SciTech Connect

    Hiergesell, R; Daniel Kaplan,D

    2007-05-21

    An issue of concern at the Savannah River Site (SRS) over the past 20 years is whether tritiated groundwater originating at SRS might be the cause of low levels of tritium measured in certain domestic wells in Georgia. Tritium activity levels in several domestic wells have been observed to occur at levels comparable to what is measured in rainfall in areas surrounding SRS. Since 1988, there has been speculation that tritiated groundwater from SRS could flow under the river and find its way into Georgia wells. A considerable effort was directed at assessing the likelihood of trans-river flow, and 44 wells have been drilled by the USGS and the Georgia Department of Natural Resources. Also, as part of the data collection and analysis, the USGS developed a numerical model during 1997-98 (Ref. 1) to assess the possibility for such trans-river flow to occur. The model represented the regional groundwater flow system surrounding the Savannah River Site (SRS) in seven layers corresponding to the underlying hydrostratigraphic units, which was regarded as sufficiently detailed to evaluate whether groundwater originating at SRS could possibly flow beneath the Savannah River into Georgia. The model was calibrated against a large database of water-level measurements obtained from wells on both sides of the Savannah River and screened in each of the hydrostratigraphic units represented within the model. The model results verified that the groundwater movement in all hydrostratigraphic units proceeds laterally toward the Savannah River from both South Carolina and Georgia, and discharges into the river. Once the model was calibrated, a particle-track analysis was conducted to delineate areas of potential trans-river flow. Trans-river flow can occur in either an eastward or westward direction. The model indicated that all locations of trans-river flow are restricted to the Savannah River's floodplain, where groundwater passes immediately prior to discharging into the river

  20. Sludge application program at the Savannah River Plant

    SciTech Connect

    Corey, J C; Lower, M W; Davis, C E

    1985-01-01

    Since 1980 a research program has been conducted at the Savannah River Plant to evaluate the use of domestic sewage sludge to enhance forest productivity. The objectives of the program have been to determine the cost effectiveness and environmental impact of using sewage sludge as a soil conditioner and slow-release fertilizer. The potential impacts of sludge application on nutrient cycling, organic carbon budgets, forest wildlife, and biomass production have been studied. Soil, soil water, groundwater, and stand biomass samples have been analyzed to monitor the availability and movement of nutrients and metals. Remote sensing techniques have been applied to the plots to see if they have large scale application to biomass determinations. Results of the study have been used to develop guidelines for land application of domestic sewage sludge.

  1. Pen Branch Delta and Savannah River Swamp Hydraulic Model

    SciTech Connect

    Chen, K.F.

    1999-05-13

    The proposed Savannah River Site (SRS) Wetlands Restoration Project area is located in Barnwell County, South Carolina on the southwestern boundary of the SRS Reservation. The swamp covers about 40.5 km2 and is bounded to the west and south by the Savannah River and to the north and east by low bluffs at the edge of the Savannah River floodplain. Water levels within the swamp are determined by stage along the Savannah River, local drainage, groundwater seepage, and inflows from four tributaries, Beaver Dam Creek, Fourmile Branch, Pen Branch, and Steel Creek. Historic discharges of heated process water into these tributaries scoured the streambed, created deltas in the adjacent wetland, and killed native vegetation in the vicinity of the delta deposits. Future releases from these tributaries will be substantially smaller and closer to ambient temperatures. One component of the proposed restoration project will be to reestablish indigenous wetland vegetation on the Pen Branch delta that covers about 1.0 km2. Long-term predictions of water levels within the swamp are required to determine the characteristics of suitable plants. The objective of the study was to predict water levels at various locations within the proposed SRS Wetlands Restoration Project area for a range of Savannah River flows and regulated releases from Pen Branch. TABS-MD, a United States Army Corps of Engineer developed two-dimensional finite element open channel hydraulic computer code, was used to model the SRS swamp area for various flow conditions.

  2. Environmental assessment operation of the HB-Line facility and frame waste recovery process for production of Pu-238 oxide at the Savannah River Site

    SciTech Connect

    1995-04-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0948, addressing future operations of the HB-Line facility and the Frame Waste Recovery process at the Savannah River Site (SRS), near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, DOE has concluded that, the preparation of an environmental impact statement is not required, and is issuing this Finding of No Significant Impact.

  3. Assessment of Technetium in the Savannah River Site Environment

    SciTech Connect

    Carlton, W.H.; Denham, M.; Evans, A.G.

    1993-07-01

    Assessment of Technetium in the Savannah River Site Environment is the last in a series of eight documents on individual radioisotopes released to the environment as a result of SRS operations. The earlier documents describe the environmental consequences of tritium cesium, iodine, uranium plutonium, strontium, and carbon. Technetium transport and metabolism have been studied by the nuclear industry because it is a fission product of uranium, and by the medical community because {sup 99m}Tc commonly is used as a diagnostic imaging agent in nuclear medicine. Technetium has been produced at SRS during the operation of five production reactors. The only isotope with environmental significance is {sup 99}Tc. Because of the small activities of {sup 99}Tc relative to other fission products, such as {sup 90}Sr and {sup 137}Cs, no measurements were made of releases to either the atmosphere or surface waters. Dose calculations were made in this document using conservative estimates of atmospheric releases and from a few measurements of {sup 99}Tc concentrations in the Savannah River. Technetium in groundwater has been found principally in the vicinity of the separation areas seepage basins. Technetium is soluble in water and follows groundwater flow with little retardation. While most groundwater samples are negative or show little technetium a few samples have levels slightly above the limits set by the EPA for drinking water. The overall radiological impact of SRS {sup 99}Tc releases on the offsite maximally exposed individual during 38 years of operations can be characterized by maximum individual doses of 0.1 mrem (atmospheric) and 0.8 mrem (liquid), compared with a dose of 13,680 mrem from non-SRS sources during the same time period. Technetium releases have resulted in a negligible risk to the environment and the population it supports.

  4. Radioactive effluents in Savannah River -- Summary report for 1991

    SciTech Connect

    Winn, W.G.

    1992-07-16

    During 1991, low-level radiometric studies of the Savannah River continued to distinguish between effluent contributions from Plant Vogtle and the Savannah River Site. Measurements of these radioactive effluents are of mutual interest to both institutions, as they can address disturbing trends before they become health and legal concerns. During 1991, the radioactive effluents in the Savannah River were somewhat less than those observed in 1990. This decreasing trend has followed Vogtle improvements in pre-processing their liquid effluents. These effluents continue to be dominated by {sup 58}Co, which had a maximum concentration of only 0.21 pCi/L, which is an order of magnitude lower than the maximum observed in 1990. Many of the other man-made radionuclides observed in 1987--1990 have now decreased to where some are not even detected, and no new radionuclides were detected in the 1991 Vogtle effluents.

  5. Mixed waste disposal facilities at the Savannah River Site

    SciTech Connect

    Wells, M.N.; Bailey, L.L.

    1991-12-31

    The Savannah River Site (SRS) is a key installation of the US Department of Energy (DOE). The site is managed by DOE`s Savannah River Field Office and operated under contract by the Westinghouse Savannah River Company (WSRC). The Site`s waste management policies reflect a continuing commitment to the environment. Waste minimization, recycling, use of effective pre-disposal treatments, and repository monitoring are high priorities at the site. One primary objective is to safely treat and dispose of process wastes from operations at the site. To meet this objective, several new projects are currently being developed, including the M-Area Waste Disposal Project (Y-Area) which will treat and dispose of mixed liquid wastes, and the Hazardous Waste/Mixed Waste Disposal Facility (HW/MWDF), which will store, treat, and dispose of solid mixed and hazardous wastes. This document provides a description of this facility and its mission.

  6. Mixed waste disposal facilities at the Savannah River Site

    SciTech Connect

    Wells, M.N.; Bailey, L.L.

    1991-01-01

    The Savannah River Site (SRS) is a key installation of the US Department of Energy (DOE). The site is managed by DOE's Savannah River Field Office and operated under contract by the Westinghouse Savannah River Company (WSRC). The Site's waste management policies reflect a continuing commitment to the environment. Waste minimization, recycling, use of effective pre-disposal treatments, and repository monitoring are high priorities at the site. One primary objective is to safely treat and dispose of process wastes from operations at the site. To meet this objective, several new projects are currently being developed, including the M-Area Waste Disposal Project (Y-Area) which will treat and dispose of mixed liquid wastes, and the Hazardous Waste/Mixed Waste Disposal Facility (HW/MWDF), which will store, treat, and dispose of solid mixed and hazardous wastes. This document provides a description of this facility and its mission.

  7. ONSITE TRANSPORTATION AUTHORIZATION CHALLENGES AT THE SAVANNAH RIVER SITE

    SciTech Connect

    Watkins, R.; Loftin, B.; Hoang, D.; Maxted, M.

    2012-05-30

    Prior to 2008, transfers of radioactive material within the Savannah River Site (SRS) boundary, referred to as onsite transfers, were authorized by Transportation Safety Basis (TSB) documents that only required approval by the SRS contractor. This practice was in accordance with the existing SRS Transportation Safety Document (TSD). In 2008 the Department of Energy Savannah River Field Office (DOE-SR) requested that the SRS TSD be revised to require DOE-SR approval of all Transportation Safety Basis (TSB) documents. As a result, the primary SRS contractor embarked on a multi-year campaign to consolidate old or generate new TSB documents and obtain DOE-SR approval for each. This paper focuses on the challenges incurred during the rewriting or writing of and obtaining DOE-SR approval of all Savannah River Site Onsite Transportation Safety Basis documents.

  8. Flood frequency of the Savannah River at Augusta, Georgia

    USGS Publications Warehouse

    Sanders, C.L., Jr.; Kubik, H.E.; Hoke, J.T., Jr.; Kirby, W.H.

    1990-01-01

    To fill an increasing need for reliable information on floods of various recurrence intervals on the Savannah River a flood-frequency relation was developed for the long-term gaging station at Augusta, Georgia. The flood-frequency analysis was complicated by the fact that the Savannah River upstream of Augusta has experienced increasing regulation of flow caused by three large dams constructed since 1952. The pre-impoundment period was important to the flood-frequency analysis because it included a number of large floods that, even when adjusted for regulation, exceed all floods since 1952. A reservoir routing model was used to adjust nine such floods for the effects of regulation, and to develop a relation for estimating regulated peak discharges for additional unregulated floods. The 1% chance exceedance flood for regulated conditions on the Savannah River at Augusta was computed as 180,000 cu ft/sec. (USGS)

  9. Audit of groundwater remediation plans at the Savannah River Site

    SciTech Connect

    1996-06-11

    The Department of Energy was required to reduce groundwater contamination that represented a risk to human health or the environment. To achieve this goal, the Savannah River Operations Office (Savannah River) entered into several formal agreements with Federal and State regulators. The agreements described how Savannah River would reduce the level of contamination until the risks to human health and the environment were lowered to an acceptable level. The agreements called for decreasing groundwater contamination to levels that would comply with South Carolina groundwater regulations, which would allow a hypothetical future resident to someday live above the F and H Areas and drink the groundwater. We believe basing the agreements on drinking water standards was unreasonable because no one will likely live above these areas or drink the groundwater. The more stringent drinking water standards were included in the planning process because Savannah River had not developed a Land Use Plan that would permit rational decision making for the entire site. Lacking a Land Use Plan, the environmental regulators assumed, and Savannah River acceded to, the most stringent usage scenario, that the groundwater under the F and H Areas might one day be used as a source of drinking water. It will take more than one hundred years for the subterranean groundwater to become safe enough for drinking water purposes. Consequently, Savannah River may continue to pursue expensive remediation projects for longer than would be necessary to protect human health and the environment. However, the cost impact of unnecessary clean-up activities is indeterminable because acceptable contamination limits would still have to be negotiated with the South Carolina Department of Health and Environmental Control.

  10. Loss of pumping accident limit calculation for Savannah River Reactor

    SciTech Connect

    Paul, P.K.; Barbour, K.L. )

    1992-01-01

    For the Savannah River Site production reactors, the design basis accident reactor power limit ensures that if a double-ended guillotine break (DEGB) in a secondary cooling water pipe were to occur, the reactor will shut down safely. The primary reactor coolant is heavy water (D{sub 2}O) with secondary light water (H{sub 2}O) cooling. The accident scenario is a DEGB in one of two secondary coolant inlet header pipes with several assumed single failures. The recycled primary coolant loses its cooling, and the reactor core temperature begins to rise. Another possible accident is a DEGB in one of two heat exchanger secondary coolant effluent header pipes. The inlet header break is slightly more limiting than the effluent header break. Upon break detection, emergency shutdown begins and the emergency cooling system (ECS) activates. The accident scenario was constructed with regard to physical, mechanical, and human factors. The computer code TRAC simulates the accident.

  11. Assessment of radiocarbon in the Savannah River Site Environment

    SciTech Connect

    Carlton, W.H.; Evans, A.G.; Murphy, C.E. Jr.; Tuck, D.M.

    1993-03-01

    This report is a radiological assessment of [sup 14]C releases from the Savannah River Site. During the operation of five production reactors [sup 14]C has been produced at SRS. Approximately 3000 curies have been released to the atmosphere but there are no recorded releases to surface waters. Once released, the [sup 14]C joins the carbon cycle and a portion enters the food chain. The overall radiological impact of SRS releases on the offsite maximum individual can be characterized by a dose of 1.1 mrem, compared with a dose of 12,960 mrem from non-SRS sources during the same period of time. Releases of [sup 14]C have resulted in a negligible risk to the environment and the population it supports.

  12. Assessment of radiocarbon in the Savannah River Site Environment

    SciTech Connect

    Carlton, W.H.; Evans, A.G.; Murphy, C.E. Jr.; Tuck, D.M.

    1993-03-01

    This report is a radiological assessment of {sup 14}C releases from the Savannah River Site. During the operation of five production reactors {sup 14}C has been produced at SRS. Approximately 3000 curies have been released to the atmosphere but there are no recorded releases to surface waters. Once released, the {sup 14}C joins the carbon cycle and a portion enters the food chain. The overall radiological impact of SRS releases on the offsite maximum individual can be characterized by a dose of 1.1 mrem, compared with a dose of 12,960 mrem from non-SRS sources during the same period of time. Releases of {sup 14}C have resulted in a negligible risk to the environment and the population it supports.

  13. Savannah River Restart Peer Evaluation Program final examination report

    SciTech Connect

    Morgan, M.P.; Draper, D.G.

    1991-12-01

    During the period of August 13, 1990 through September 6, 1991 the Savannah River Peer Evaluation Program was administered during three distinct phases to 73 certified Central Control Room Operators, Central Control Room Supervisors, and Shift Technical Engineers assigned to the K Reactor, on the Savannah River Site (SRS). This program was conceived and developed by the Department of Energy (DOE) and it's implementation satisfies recommendations made by the Defense Nuclear Facilities Safety Board. The review identified both strengths and weaknesses of the procedures and personnel.

  14. Savannah River Restart Peer Evaluation Program final examination report

    SciTech Connect

    Morgan, M.P.; Draper, D.G.

    1991-12-01

    During the period of August 13, 1990 through September 6, 1991 the Savannah River Peer Evaluation Program was administered during three distinct phases to 73 certified Central Control Room Operators, Central Control Room Supervisors, and Shift Technical Engineers assigned to the K Reactor, on the Savannah River Site (SRS). This program was conceived and developed by the Department of Energy (DOE) and it`s implementation satisfies recommendations made by the Defense Nuclear Facilities Safety Board. The review identified both strengths and weaknesses of the procedures and personnel.

  15. Vision/viewing development status, Savannah River Plant

    SciTech Connect

    Heckendorn, F.M.; Veenema, P.

    1988-01-01

    The Savannah River Laboratory (SRL) continues to provide support to the Savannah River Plant (SRP) in many areas of Robotics and Vision/Viewing. An overview of the work recently completed or now in progress in the Vision/Viewing areas is provided below. The nature of the work at SRP has indicated the need for both vision systems related to classic robotics and viewing systems of a specialized nature. The latter concerns the maximizing of information gathering and control efforts in radiation environments not suitable for continued human presence. The following sections will address these applications separately. 17 figs.

  16. Solidification of Savannah River Plant high-level waste

    SciTech Connect

    Maher, R; Shafranek, L F; Stevens, III, W R

    1983-01-01

    The Department of Energy, in accord with recommendations from the Du Pont Company, has started construction of a Defense Waste Processing Facility (DWPF) at the Savannah River Plant. The facility should be completed by the end of 1988, and full-scale operation should begin in 1990. This facility will immobilize in borosilicate glass the large quantity of high-level radioactive waste now stored at the plant plus the waste to be generated from continued chemical reprocessing operations. The existing wastes at the Savannah River Plant will be completely converted by about 2010. 21 figures.

  17. 76 FR 38143 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy, DOE... Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L... CONTACT: Gerri Flemming, Office of External Affairs, Department of Energy, Savannah River...

  18. 76 FR 55369 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463... Flemming, Office of External Affairs, Department of Energy, Savannah River Operations Office, P.O. Box...

  19. 76 FR 25682 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-05

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463... of External Affairs, Department of Energy, Savannah River Operations Office, P.O. Box A, Aiken,...

  20. 78 FR 14088 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act requires that... Affairs, Department of Energy, Savannah River Operations Office, P.O. Box A, Aiken, SC 29802; Phone:...

  1. 76 FR 65706 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463... Flemming, Office of External Affairs, Department of Energy, Savannah River Operations Office, P.O. Box...

  2. 76 FR 11772 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463... of External Affairs, Department of Energy, Savannah River Operations Office, P.O. Box A, Aiken,...

  3. 78 FR 26005 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463...: Gerri Flemming, Office of External Affairs, Department of Energy, Savannah River Operations Office,...

  4. 78 FR 40130 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. No. 92... CONTACT: Gerri Flemming, Office of External Affairs, Department of Energy, Savannah River...

  5. 75 FR 65466 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463... Flemming, Office of External Affairs, Department of Energy, Savannah River Operations Office, P.O. Box...

  6. 75 FR 24684 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463... of External Affairs, Department of Energy, Savannah River Operations Office, P.O. Box A, Aiken,...

  7. 75 FR 9885 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463... External Affairs, Department of Energy, Savannah River Operations Office, P.O. Box A, Aiken, SC...

  8. 75 FR 82001 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act requires that... Affairs, Department of Energy, Savannah River Operations Office, P.O. Box A, Aiken, SC 29802; Phone:...

  9. 77 FR 13104 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463... of External Affairs, Department of Energy, Savannah River Operations Office, P.O. Box A, Aiken,...

  10. 78 FR 54461 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-04

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463... CONTACT: Gerri Flemming, Office of External Affairs, Department of Energy, Savannah River...

  11. 75 FR 57462 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. No. 92...: Gerri Flemming, Office of External Affairs, Department of Energy, Savannah River Operations Office,...

  12. 78 FR 65979 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463..., Office of External Affairs, Department of Energy, Savannah River Operations Office, P.O. Box A, Aiken,...

  13. 77 FR 39235 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463...: Gerri Flemming, Office of External Affairs, Department of Energy, Savannah River Operations Office,...

  14. 76 FR 81487 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463... Flemming, Office of External Affairs, Department of Energy, Savannah River Operations Office, P.O. Box...

  15. 75 FR 983 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463... Smith, Office of External Affairs, Department of Energy, Savannah River Operations Office, P.O. Box...

  16. 77 FR 24695 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-25

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. . 92... Flemming, Office of External Affairs, Department of Energy, Savannah River Operations Office, P.O. Box...

  17. 77 FR 53193 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... Environmental Management Site-Specific Advisory Board, Savannah River Site AGENCY: Department of Energy. ACTION...-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463... CONTACT: Gerri Flemming, Office of External Affairs, Department of Energy, Savannah River...

  18. Composition of phytoplankton communities and their contribution to secondary productivity in Carolina Bays on the Savannah River Plant

    SciTech Connect

    Williams, J.B. . Dept. of Natural Sciences)

    1989-08-01

    The overall goal of this three-year project is to determine the importance of phytoplankton (microscopic algae) as a component of the food chain base in SRS Carolina Bays (shallow temporary ponds endemic to the Southeastern US). Previous investigations and ongoing SREL studies have determined the importance of Carolina bay zooplankton (microscopic crustacean herbivores) to the early life stages of amphibians. Our project is testing the hypothesis that phytoplankton are the primary component of zooplankton diets in these bays. Carolina Bays represent critical habitats for a whole class of vertebrates at SRS, the amphibians. Details of phytoplankton dynamics and productivity gained from our project will advance our understanding of ecological energetics within Carolina Bay systems. These results will also help determine the potential impact that these minute, but productive plants can have on SRS biota beyond the bounds of these aquatic ecosystems. Additional implications can be made concerning chemical elemental uptake and transfer from phytoplankton to higher trophic levels. 12 figs.

  19. Wetland restoration and compliance issues on the Savannah River site

    SciTech Connect

    Wein, G.R.; McLeod, K.W.; Sharitz, R.R. )

    1993-01-01

    Operation of the nuclear production reactors on the Savannah River Site has faced potential conflicts with wetland regulations on several occasions. This paper provides two examples in which regulatory compliance and restoration research have been meshed, providing both compliance and better knowledge to aid future regulatory needs. The decision to restart the L reactor required the mitigation of thermal effluents under Sec. 316 of the Clean Water Act. The National Pollutant Discharge Elimination System, permit for the selected mitigation alternative, a 405-ha once-through cooling reservoir, required the establishment of a balanced biological community (BBC) within the lake. To promote the development of a BBC, the reservoir was seeded with water from an existing BBC (Par Pond) and stocked with fish and had artificial reefs constructed. The US Department of Energy (DOE) also requested that the Savannah River Ecology Laboratory establish littoral/wetland vegetation along the shoreline to provide aquatic and wildlife habitat, shoreline stabilization, and a good faith effort toward the establishment of a BBC. The development of wetland vegetation was deemed important to the successful development of a BBC within L Lake. However, in a similar cooling reservoir system constructed in 1957 (Par Pond), wetland vegetation successfully developed without any planting effort. Other than the good faith effort toward a BBC, there is no reason to assume a littoral/wetland community would not develop of its own accord. However, research conducted at L Lake indicates that the planting of wetland vegetation at L Lake accelerated the process of natural selection over that of areas that were not planted.

  20. Software quality assurance (SQA) for Savannah River reactors

    SciTech Connect

    Schaumann, C.M.

    1990-01-01

    Over the last 25 years, the Savannah River Site (SRS) has developed a strong Software Quality Assurance (SQA) program. It provides the information and management controls required of a high quality auditable system. The SRS SQA program provides the framework to meet the requirements in increasing regulation.

  1. Numerical Weather Forecasting at the Savannah River Site

    SciTech Connect

    Buckley, R.L.

    1999-01-26

    Facilities such as the Savannah River Site (SRS), which contain the potential for hazardous atmospheric releases, rely on the predictive capabilities of dispersion models to assess possible emergency response actions. The operational design in relation to domain size and forecast time is presented, along with verification of model results over extended time periods with archived surface observations.

  2. Savannah River Plant californium-252 Shuffler electronics manual

    SciTech Connect

    Bourret, S.C.; Crane, T.W.; Eccleston, G.W.; Gallegos, E.A.; Garcia, D.L.

    1980-03-01

    Detailed information is presented in this report, an electronics manual for the Savannah River Plant Shuffler, about the electronics associated with the various control and data acquisition functions of the Shuffler subsystems. Circuit diagrams, interconnection information, and details about computer control and programming are included.

  3. Natural Gas Storage Research at Savannah River National Laboratory

    SciTech Connect

    Anton, Don; Sulic, Martin; Tamburello, David A.

    2015-05-04

    As an alternative to imported oil, scientists at the Department of Energy’s Savannah River National Laboratory are looking at abundant, domestically sourced natural gas, as an alternative transportation fuel. SRNL is investigating light, inexpensive, adsorbed natural gas storage systems that may fuel the next generation of automobiles.

  4. The Savannah River Site's Groundwater Monitoring Program, third quarter 1991

    SciTech Connect

    Not Available

    1992-02-17

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  5. Probabilities of Natural Events Occurring at Savannah River Plant

    SciTech Connect

    Huang, J.C.

    2001-07-17

    This report documents the comprehensive evaluation of probability models of natural events which are applicable to Savannah River Plant. The probability curves selected for these natural events are recommended to be used by all SRP/SRL safety analysts. This will ensure a consistency in analysis methodology for postulated SAR incidents involving natural phenomena.

  6. Savannah River Technology Center monthly report, September 1992

    SciTech Connect

    Ferrell, J.M.

    1992-09-01

    This is a monthly progress report from the Savannah River Laboratory for the month of September, 1992. It has sections dealing with work in the broad areas of reactor safety, tritium processes and absorption, separations programs and wastes, environmental concerns and responses, waste management practices, and general concerns.

  7. Probability of Liquefaction for H-Area Savannah River Site

    SciTech Connect

    Lee, R.C.

    2000-09-27

    In 1995 WSRC completed the geotechnical assessment for the In-Tank Precipitation Facility and the H-Tank Farm at the Savannah River Site. As part of that assessment, a probabilistic liquefaction evaluation for the Tobacco Road soils was completed.

  8. Hydrogen purifiers go to Savannah River Site to process tritium

    SciTech Connect

    Chu, W.

    1996-12-31

    The Johnson Matthey Fabricated Equipment group has been awarded a contract to supply the United States government Savannah River Site (SRS) with six additional ultra-high purity hydrogen purifier systems specially designed to process tritium in support of national defense programs. The purifiers employ palladium membrane diffusion technology.

  9. Onsite transportation of radioactive materials at the Savannah River Site

    SciTech Connect

    Watkins, R.

    2015-03-03

    The Savannah River Site (SRS) Transportation Safety Document (TSD) defines the onsite packaging and transportation safety program at SRS and demonstrates its compliance with Department of Energy (DOE) transportation safety requirements, to include DOE Order 460.1C, DOE Order 461.2, Onsite Packaging and Transfer of Materials of National Security Interest, and 10 CFR 830, Nuclear Safety Management (Subpart B).

  10. Startup of Savannah River`s Defense Waste Processing Facility to produce radioactive glass

    SciTech Connect

    Bennett, W.M.

    1997-08-06

    The Savannah River Site (SRS) began production of radioactive glass in the Defense Waste Process Facility (DWPF) in 1996 following an extensive test program discussed earlier. Currently DWPF is operating in a `sludge only` mode to produce radioactive glass consisting of washed high-level waste sludge and glass frit. Future operations will produce radioactive glass consisting of washed high-level waste sludge, precipitated cesium, and glass frit. This paper provides an update of processing activities to date, operational problems encountered since entering radioactive operations, and the programs underway to solve them.

  11. 77 FR 19534 - Special Local Regulations; Savannah Tall Ships Challenge, Savannah River, Savannah, GA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-02

    ... Register (77 FR 6039). We received two comments on the proposed rule. No public meeting was requested, and... areas: Mooring zones; buffer zones; and ] a staging area. First, mooring zones will be established.... Second, buffer zones will be established around vessels participating in the Savannah Tall...

  12. Radioactive effluents in Savannah River. Summary report for 1990

    SciTech Connect

    Winn, W.G.

    1991-11-27

    During 1990, low-level radiometric studies of the Savannah River continued to distinguish between effluent contributions from Plant Vogtle and the Savannah River Site. Measurements of these radioactive effluents are of mutual interest to both institutions, as they can address disturbing trends before they become health and legal concerns. The Environmental Technology Section (ETS) has conducted radiometric studies of Plant Vogtle since late 1986, prior to its startup. The plant has two 1100 MWe pressurized water reactors developed by Westinghouse. Unit 1 started commercial operations in June 1987, and Unit 2 began in May 1989. During powered operations, ETS has routinely detected neutron-activated isotopes in controlled releases but all activities have been several orders of magnitude below the DOE guide values. In 1990, processing improvements for Vogtle effluents have yielded even lower activities in the river. The Vogtle release data and the ETS measurements have tracked well over the past four years.

  13. 33 CFR 100.732 - Annual River Race Augusta; Savannah River, Augusta GA.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Annual River Race Augusta... River Race Augusta; Savannah River, Augusta GA. (a) Definitions: (1) Regulated Area. The regulated area... Race Augusta each day, and during intervals between scheduled events, at the discretion of the...

  14. 33 CFR 100.732 - Annual River Race Augusta; Savannah River, Augusta GA.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Annual River Race Augusta... River Race Augusta; Savannah River, Augusta GA. (a) Definitions: (1) Regulated Area. The regulated area... Race Augusta each day, and during intervals between scheduled events, at the discretion of the...

  15. 33 CFR 100.732 - Annual River Race Augusta; Savannah River, Augusta GA.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Annual River Race Augusta... River Race Augusta; Savannah River, Augusta GA. (a) Definitions: (1) Regulated Area. The regulated area... Race Augusta each day, and during intervals between scheduled events, at the discretion of the...

  16. 33 CFR 100.732 - Annual River Race Augusta; Savannah River, Augusta GA.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Annual River Race Augusta... River Race Augusta; Savannah River, Augusta GA. (a) Definitions: (1) Regulated Area. The regulated area... Race Augusta each day, and during intervals between scheduled events, at the discretion of the...

  17. INSTALLATION OF BUBBLERS IN THE SAVANNAH RIVER SITED DEFENSE WASTE PROCESSING FACILITY MELTER

    SciTech Connect

    Smith, M.; Iverson, D.

    2010-12-08

    Savannah River Remediation (SRR) LLC assumed the liquid waste contract at the Savannah River Site (SRS) in the summer of 2009. The main contractual agreement was to close 22 High Level Waste (HLW) tanks in eight years. To achieve this aggressive commitment, faster waste processing throughout the SRS liquid waste facilities will be required. Part of the approach to achieve faster waste processing is to increase the canister production rate of the Defense Waste Processing Facility (DWPF) from approximately 200 canisters filled with radioactive waste glass per year to 400 canisters per year. To reach this rate for melter throughput, four bubblers were installed in the DWPF Melter in the late summer of 2010. This effort required collaboration between SRR, SRR critical subcontractor EnergySolutions, and Savannah River Nuclear Solutions, including the Savannah River National Laboratory (SRNL). The tasks included design and fabrication of the bubblers and related equipment, testing of the bubblers for various technical issues, the actual installation of the bubblers and related equipment, and the initial successful operation of the bubblers in the DWPF Melter.

  18. Synthesis of historical archaeological sites on the Savannah River Plant, Aiken and Barnwell Counties, South Carolina

    SciTech Connect

    Brooks, R.D.

    1988-01-01

    The object of this report is to provide historical synthesis of the Savannah River Plant region integrated with the historical archeological record. The first chapter discusses the historic research concerns of the Savannah River Archaeological Research Program, the Physical Geography of the Savannah River Plant in regard to climate, coil, and vegetation, and the Human Geography of the region. Chapter 2 presents the Chronology of historic sites from the archarological record on the Savannah River Plant. Chapter 3 discusses the Settlement of the Savannah River Valley and the Agricultural Land use on the Savannah River Plant. Chapter 4 presents the results of historic research into the Mill Dams located on the Savannah River Plant their political importance and location. Chapter 5 discribes the Archaeological Methodology used and the Archaeological Resources of the Savannah River Plant. Chapter 6 present the Conclusions and Recommendations of the Savannah River Plant Archaeological Research Program in regards to the historical archeological sites on the Savannah River Plant. 80 refs., 13 figs., 23 tabs.

  19. Environmental information document: Savannah River Laboratory Seepage Basins

    SciTech Connect

    Fowler, B.F.; Looney, B.B.; Simmons, R.V.; Bledsoe, H.W.

    1987-03-01

    This document provides environmental information on postulated closure options for the Savannah River Laboratory Seepage Basins at the Savannah River Plant and was developed as background technical documentation for the Department of Energy`s proposed Environmental Impact Statement (EIS) on waste management activities for groundwater protection at the plant. The results of groundwater and atmospheric pathway analyses, accident analysis, and other environmental assessments discussed in this document are based upon a conservative analysis of all foreseeable scenarios as defined by the National Environmental Policy Act (CFR, 1986). The scenarios do not necessarily represent actual environmental conditions. This document is not meant to be used as a closure plan or other regulatory document to comply with required federal or state environmental regulations.

  20. Native American prehistory of the middle Savannah River Valley

    SciTech Connect

    Sassaman, K.E.; Brooks, M.J.; Hanson, G.T.; Anderson, D.G.

    1990-01-01

    Archaeological investigations on the United States Department of Energy's (DOE) Savannah River Site (SRS) in South Carolina span 17 years and continue today through a cooperative agreement between DOE and the South Carolina Institute of Archaeology and Anthropology (SCIAA), University of South Carolina. The Savannah River Archaeological Research Program (SRARP) of SCIAA has been and continues to be the sole archaeological consultant for DOE-SRS. This report documents technical aspects of all prehistoric archaeological research conducted by the SRARP between 1973 and 1987. Further, this report provides interpretative contexts for archaeological resources as a basis for an archaeological resource plan reported elsewhere (SRARP 1989), and as a comprehensive statement of our current understanding of Native American prehistory. 400 refs., 130 figs., 39 tabs.

  1. Bagless Transfer at the Savannah River Site (U)

    SciTech Connect

    Rogers, L.

    1996-11-01

    Traditional methods of removing plutonium from process gloveboxes in preparation for packaging involves the use of bagout procedures utilizing plastic bags, an organic material not allowed in storage containers per the new DOE 3013 long term storage criteria. Engineers at the Savannah River Site have developed a system for removing plutonium from a glovebox directly into an all metal, welded, leaktight container free of external contamination. The process, known as bagless transfer, utilizes a Tungsten Inert Gas (TIG) welding process to fuse and separate a transfer canister from the glovebox environment while maintaining glovebox and canister integrity. A semi-automated prototype system has been demonstrated at the Savannah River Site and engineers are making preparations to demonstrate the system in radioactive operation in the site`s FB Line Plutonium Facility.

  2. The Savannah River Site's Groundwater Monitoring Program, third quarter 1989

    SciTech Connect

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During third quarter 1989 (July--September), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the third quarter is presented in the Flagging Criteria section of this document. All analytical results from third quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  3. The Savannah River Site's Groundwater Monitoring Program, second quarter 1989

    SciTech Connect

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  4. Inspection of storage tanks at the Savannah River Site

    SciTech Connect

    Vormelker, P.R.; Elder, J.B. )

    1992-01-01

    Inspections have been performed on over 200 storage tanks since the startup of the Savannah River Site in 1955. The tanks contain a variety of fluids, including alum, fuel, oil, waste oil, sodium hydroxide, chlorine, sodium hypochlorite, and sulfuric acid. Many inspection methods have been developed over the years, starting with visual and progressing to manual, straight-beam ultrasonic thicknesses at specific tank locations and then to automated ultrasonic thickness mapping. This paper will review the current inspection methods and the uses of new inspection technology at the Savannah River Site, show where inspections can be used to find potential problems before they occur and show what problems may occur when inadequate attention is given to inspections or inspection results.

  5. Inspection of storage tanks at the Savannah River Site

    SciTech Connect

    Vormelker, P.R.; Elder, J.B.

    1992-06-01

    Inspections have been performed on over 200 storage tanks since the startup of the Savannah River Site in 1955. The tanks contain a variety of fluids, including alum, fuel, oil, waste oil, sodium hydroxide, chlorine, sodium hypochlorite, and sulfuric acid. Many inspection methods have been developed over the years, starting with visual and progressing to manual, straight-beam ultrasonic thicknesses at specific tank locations and then to automated ultrasonic thickness mapping. This paper will review the current inspection methods and the uses of new inspection technology at the Savannah River Site, show where inspections can be used to find potential problems before they occur and show what problems may occur when inadequate attention is given to inspections or inspection results.

  6. Savannah River Site TEP-SET tests uncertainty report

    SciTech Connect

    Taylor, D.J.N.

    1993-09-01

    This document presents a measurement uncertainty analysis for the instruments used for the Phase I, II and III of the Savannah River One-Fourth Linear Scale, One-Sixth Sector, Tank/Muff/Pump (TMP) Separate Effects Tests (SET) Experiment Series. The Idaho National Engineering Laboratory conducted the tests for the Savannah River Site (SRS). The tests represented a range of hydraulic conditions and geometries that bound anticipated Large Break Loss of Coolant Accidents in the SRS reactors. Important hydraulic phenomena were identified from experiments. In addition, code calculations will be benchmarked from these experiments. The experimental system includes the following measurement groups: coolant density; absolute and differential pressures; turbine flowmeters (liquid phase); thermal flowmeters (gas phase); ultrasonic liquid level meters; temperatures; pump torque; pump speed; moderator tank liquid inventory via a load cells measurement; and relative humidity meters. This document also analyzes data acquisition system including the presampling filters as it relates to these measurements.

  7. Water resource management planning guide for Savannah River Plant

    SciTech Connect

    Hubbard, J.E.; Stephenson, D.E.; Steele, J.L. and Co., Aiken, SC . Savannah River Lab.); Gordon, D.E. and Co., Aiken, SC . Savannah River Plant)

    1988-10-01

    The Water Resource Management Planning Guide provides an outline for the development of a Savannah River Plant Water Resource Management Plan (WRMP) to protect, manage, and monitor the site's water resources. The management plan is based on three principle elements: (1) protection of the water quality, (2) management of the water quantity, and (3) monitoring of the water quality and quantity. The plan will assure that changes in water quality and quantity are identified and that corrective action is implemented as needed. In addition, water management activities within and between Savannah River Plant (SRP) organizations and departments will be coordinated to ensure the proper management of water resources. This document is intended as a guide to suggest goals and objectives that will provide a basis for the development of a water resource plan for SRP. Planning should be flexible rather than rigid, and the plan outlines in this document was prepared to be modified or updated as conditions necessitate. 16 refs., 12 figs.

  8. Radioactive releases at the Savannah River Site, 1954--1989

    SciTech Connect

    Cummins, C.L.; Hetrick, C.S.; Martin, D.K.

    1991-02-01

    This report is the continuation of a series of reports, previously titled, Releases of Radioactivity at the Savannah River Plant (DPSPU-YR-25-1). The reports reflect the use of air and liquid effluent sample analyses in determining the amount of radioactivity released from Savannah River Site (SRS) operations. The identification and characterization of these source terms since plant startup in 1954 have aided Site personnel in confining and limiting the amount of radioactivity released to the environment from SRS facilities. This document is an effluent/source term report; items falling under other categories, such as environmental spills or solid waste transport to the burial ground, are not included. Any classified or secret data have either been excluded, as in the case of 1960--1970 atmospheric releases of {sup 85}Kr from the Separations Areas, or combined to avoid classification, such as atmospheric tritium releases from the Separations Area.

  9. Tiger Team Assessment of the Savannah River Site

    SciTech Connect

    Not Available

    1990-06-01

    This draft document contains findings identified during the Tiger Team Compliance Assessment of the US Department of Energy Savannah River Site (SRS), located in three counties (Aiken, Barnwell and Allendale), South Carolina. The Assessment was directed by the Department's Office of the Assistant Secretary for Environment, Safety, and Health (ES H) and was conducted from January 29 to March 23, 1990. The Savannah River Site Tiger Team Compliance Assessment was broad in scope covering the Environment, Safety and Health, and Management areas and was designed to determine the site's compliance with applicable Federal (including DOE), state, and local regulations and requirements. The scope of the Environmental assessment was sitewide while the Safety and Health assessments included site operating facilities (except reactors), and the sitewide elements of Aviation Safety, Emergency Preparedness, Medical Services, and Packaging and Transportation.

  10. Tiger Team Assessment of the Savannah River Site: Appendices

    SciTech Connect

    Not Available

    1990-06-01

    This draft document contains findings identified during the Tiger Team Compliance Assessment of the US Department of Energy Savannah River Site (SRS), located in three countries (Aiken, Barnwell and Allendale), South Carolina. The Assessment was directed by the Department's Office of the Assistant Secretary for Environment, Safety, and Health (ES H) and was conducted from January 29 to March 23, 1990. The Savannah River Site Tiger Team Compliance Assessment was broad in scope covering the Environment, Safety and Health, and Management areas and was designed to determine the site's compliance with applicable Federal (including DOE), state, and local regulations and requirements. The scope of the Environmental assessment was sitewide while the Safety and Health assessments included site operating facilities (except reactors), and the sitewide elements of Aviation Safety, Emergency Preparedness, Medical Services, and Packaging and Transportation. This report contains the appendices to the assessment.

  11. The Savannah River Site's Groundwater Monitoring Program, first quarter 1989

    SciTech Connect

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During first quarter 1989 (January--March), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the first quarter is presented in the Flagging Criteria section of this document. All analytical results from first quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  12. Worker Alienation and Compensation at the Savannah River Site.

    PubMed

    Ashwood, Loka; Wing, Steve

    2016-05-01

    Corporations operating U.S. nuclear weapons plants for the federal government began tracking occupational exposures to ionizing radiation in 1943. However, workers, scholars, and policy makers have questioned the accuracy and completeness of radiation monitoring and its capacity to provide a basis for workers' compensation. We use interviews to explore the limitations of broad-scale, corporate epidemiological surveillance through worker accounts from the Savannah River Site nuclear weapons plant. Interviewees report inadequate monitoring, overbearing surveillance, limited venues to access medical support and exposure records, and administrative failure to report radiation and other exposures at the plant. The alienation of workers from their records and toil is relevant to worker compensation programs and the accuracy of radiation dose measurements used in epidemiologic studies of occupational radiation exposures at the Savannah River Site and other weapons plants. PMID:26956018

  13. Environmental audit of the Savannah River Ecology Laboratory (SREL)

    SciTech Connect

    Not Available

    1993-09-01

    This report documents the results of the environmental audit conducted at the Savannah River Ecology Laboratory (SREL) at the Savannah River Site (SRS), principally in Aiken and Barnwell Counties, South Carolina. The audit was conducted by the US Department of Energy`s (DOE`s), Office of Environmental Audit (EH-24), beginning September 13, 1993, and ending September 23, 1993. The scope of the audit at SREL was comprehensive, addressing environmental activities in the technical areas of air; surface water/drinking water; groundwater/soil, sediment, and biota; waste management; toxic and chemical materials; inactive Waste sites; radiation; quality assurance; and environmental management. Specifically assessed was the compliance of SREL operations and activities with Federal, state, and local regulations; DOE Orders; and best management practices.

  14. Savannah River Site environmental report for 1993 summary pamphlet

    SciTech Connect

    Karapatakis, L.

    1994-05-01

    This pamphlet summarizes the impact of 1993 Savannah River Site operations on the environment and the off-site public. It includes an overview of site operations; the basis for radiological and nonradiological monitoring; 1993 radiological releases and the resulting dose to the off-site population; and results of the 1993 nonradiological program. The Savannah River Site Environmental Report for 1993 describes the findings of the environmental monitoring program for 1993. The report contains detailed information about site operations,the environmental monitoring and surveillance programs, monitoring and surveillance results, environmental compliance activities, and special programs. The report is distributed to government officials, members of the US Congress, universities, government facilities, environmental and civic groups, the news media, and interested individuals.

  15. Remote video radioactive process evaluation, Savannah River Site

    SciTech Connect

    Heckendorn, F.M.

    1990-12-31

    Specialized miniature low cost video equipment has been effectively used in a number of remote, radioactive, and contaminated environments at the Savannah River Site (SRS). The equipment and related techniques have reduced the potential for personnel exposure to both radiation and physical hazards. The valuable process information thus provided would not have otherwise been available for use in improving the quality of operation at SRS.

  16. Remote video radioactive process evaluation, Savannah River Site

    SciTech Connect

    Heckendorn, F.M.

    1990-01-01

    Specialized miniature low cost video equipment has been effectively used in a number of remote, radioactive, and contaminated environments at the Savannah River Site (SRS). The equipment and related techniques have reduced the potential for personnel exposure to both radiation and physical hazards. The valuable process information thus provided would not have otherwise been available for use in improving the quality of operation at SRS.

  17. A fast shutdown system for SRS (Savannah River Site) reactors

    SciTech Connect

    Baumann, N.P.

    1990-01-01

    Power has been sharply reduced at Savannah River Site (SRS) reactors in large part to ensure that no bulk boiling occurs during hypothesized loss of coolant accidents. A fast shutdown system is essential to regain much of this lost power. Computations and experiments indicate that a He-3 injection system will serve this function. Instrumented tests of a full system are planned for early 1991 for one of the SRS reactors. 4 refs., 7 figs., 1 tab.

  18. Savannah River Site Surplus Facilities Available for Reuse

    SciTech Connect

    Clarke, R.M.; Owens, M.B.; Lentz, D.W.

    1995-09-14

    The purpose of this document is to provide a current, centralized list of Savannah River Site facilities, which are surplus and available for reuse. These surplus facilities may be made available for other DOE site missions, commercial economic development reuse, or other governmental reuse. SRS procedures also require that before new construction can be approved, available surplus facilities are screened for possible reuse in lieu of the proposed new construction.

  19. Remote video radioactive systems evaluation, Savannah River Site

    SciTech Connect

    Heckendorn, F.M.; Robinson, C.W.

    1991-01-01

    Specialized miniature low cost video equipment has been effectively used in a number of remote, radioactive, and contaminated environments at the Savannah River Site (SRS). The equipment and related techniques have reduced the potential for personnel exposure to both radiation and physical hazards. The valuable process information thus provided would not have otherwise been available for use in improving the quality of operation at SRS.

  20. Remote video radioactive systems evaluation, Savannah River Site

    SciTech Connect

    Heckendorn, F.M.; Robinson, C.W.

    1991-12-31

    Specialized miniature low cost video equipment has been effectively used in a number of remote, radioactive, and contaminated environments at the Savannah River Site (SRS). The equipment and related techniques have reduced the potential for personnel exposure to both radiation and physical hazards. The valuable process information thus provided would not have otherwise been available for use in improving the quality of operation at SRS.

  1. Savannah River Technology Center monthly report, March 1995

    SciTech Connect

    1995-03-01

    Short summaries are given on the status of projects within the Savannah River Technology Center covering the following broad topical areas: Tritium; Separations; Environmental studies; Waste management; and General. Studies listed under this last area include: Reactor support; Site robotics support; Robotics for D and D; Robotics for mixed waste operation; Integrated demonstration of an underground storage tank; and Alliance for the Advancement of Robotic Technology (AART).

  2. Assessment of Noble Gases in the Savannah River Site Environment

    SciTech Connect

    Carlton, W.H.; Murphy, C.E. Jr.

    1995-04-01

    A series of documents has been published that assesses the impact of various radionuclides released to the environment by Savannah River Site operations. The quantity released, the disposition of the radionuclides in the environment, and the dose to offsite individuals has been presented for carbon, cesium, iodine, plutonium, strontium, technetium, tritium, and uranium. An assessment of the impact of non-radioactive mercury also has been published.

  3. Summary of the Savannah River Site Criticality Dosimetry Program

    SciTech Connect

    Crase, K.W.

    1993-02-01

    The mission of the Savannah River Site (SRS) includes working with fissionable materials. A program is in place, therefore, to assess neutron and gamma doses to individuals in the event of a criticality accident at SRS. The program consists of a method to quickly screen for potentially exposed personnel, a method to provide early but preliminary dose estimates, and a nuclear accident dosimeter and assay procedure to enable final dose estimates.

  4. The Cold and Dark Process at the Savannah River Site

    SciTech Connect

    Gilmour, John C.; Willis, Michael L.

    2008-01-15

    The deactivation and decommissioning (D and D) of a facility exposes D and D workers to numerous hazards. One of the more serious hazards is coming into contact to hazardous energy sources (e.g. electrical, pressurized steam). At the Savannah River Site (SRS) a formal process for identifying and eliminating sources of hazardous energy was developed and is called 'Cold and Dark'. Several 'near miss' events involving cutting of energized conductors during D and D work in buildings thought to be isolated identified the need to have a formal process to identify and isolate these potentially hazardous systems. This process was developed using lessons learned from D and D activities at the Rocky Flats Environmental Technology Site (Rocky Flats) in Colorado. The Cold and Dark process defines an isolation boundary (usually a building perimeter) and then systematically identifies all of the penetrations through this boundary. All penetrations that involve hazardous energy sources are then physically air-gapped. The final product is a documented declaration of isolation performed by a team involving operations, engineering, and project management. Once the Cold and Dark declaration is made for a building work can proceed without the usual controls used in an operational facility (e.g. lockout/tag-out, arc flash PPE). It is important to note that the Cold and Dark process does not remove all hazards from a facility. Work planning and controls still need to address hazards that can be present from such things as chemicals, radiological contamination, residual liquids, etc., as well as standard industrial hazards. Savannah River Site experienced 6 electrical events prior to declaring a facility 'cold and dark' and has had zero electrical events after 'cold and dark' declaration (263 facilities to date). The formal Cold and Dark process developed at SRS has eliminated D and D worker exposures to hazardous energy sources. Since the implementation of the process there have been no

  5. HYDROGEN TECHNOLOGY RESEARCH AT THE SAVANNAH RIVER NATIONAL LABORATORY

    SciTech Connect

    Danko, E

    2009-03-02

    The Savannah River National Laboratory (SRNL) is a U.S. Department of Energy research and development laboratory located at the Savannah River Site (SRS) near Aiken, South Carolina. SRNL has over 50 years of experience in developing and applying hydrogen technology, both through its national defense activities as well as through its recent activities with the DOE Hydrogen Programs. The hydrogen technical staff at SRNL comprises over 90 scientists, engineers and technologists, and it is believed to be the largest such staff in the U.S. SRNL has ongoing R&D initiatives in a variety of hydrogen storage areas, including metal hydrides, complex hydrides, chemical hydrides and carbon nanotubes. SRNL has over 25 years of experience in metal hydrides and solid-state hydrogen storage research, development and demonstration. As part of its defense mission at SRS, SRNL developed, designed, demonstrated and provides ongoing technical support for the largest hydrogen processing facility in the world based on the integrated use of metal hydrides for hydrogen storage, separation, and compression. The SRNL has been active in teaming with academic and industrial partners to advance hydrogen technology. A primary focus of SRNL's R&D has been hydrogen storage using metal and complex hydrides. SRNL and its Hydrogen Technology Research Laboratory have been very successful in leveraging their defense infrastructure, capabilities and investments to help solve this country's energy problems. SRNL has participated in projects to convert public transit and utility vehicles for operation using hydrogen fuel. Two major projects include the H2Fuel Bus and an Industrial Fuel Cell Vehicle (IFCV) also known as the GATOR{trademark}. Both of these projects were funded by DOE and cost shared by industry. These are discussed further in Section 3.0, Demonstration Projects. In addition to metal hydrides technology, the SRNL Hydrogen group has done extensive R&D in other hydrogen technologies, including

  6. The Savannah River Technology Center environmental monitoring field test platform

    SciTech Connect

    Rossabi, J.

    1993-03-05

    Nearly all industrial facilities have been responsible for introducing synthetic chemicals into the environment. The Savannah River Site is no exception. Several areas at the site have been contaminated by chlorinated volatile organic chemicals. Because of the persistence and refractory nature of these contaminants, a complete clean up of the site will take many years. A major focus of the mission of the Environmental Sciences Section of the Savannah River Technology Center is to develop better, faster, and less expensive methods for characterizing, monitoring, and remediating the subsurface. These new methods can then be applied directly at the Savannah River Site and at other contaminated areas in the United States and throughout the world. The Environmental Sciences Section has hosted field testing of many different monitoring technologies over the past two years primarily as a result of the Integrated Demonstration Program sponsored by the Department of Energy`s Office of Technology Development. This paper provides an overview of some of the technologies that have been demonstrated at the site and briefly discusses the applicability of these techniques.

  7. Transportation Packages to Support Savannah River Site Missions

    SciTech Connect

    Opperman, E.

    2001-08-20

    The Savannah River Site's missions have expanded from primarily a defense mission to one that includes environmental cleanup and the stabilization, storage, and preparation for final disposition of nuclear materials. The development of packaging and the transportation of radioactive materials are playing an ever-increasing role in the successful completion of the site's missions. This paper describes the Savannah River Site and the three strategic mission areas of (1) nuclear materials stewardship, (2) environmental stewardship, and (3) nuclear weapons stockpile stewardship. The materials and components that need to be shipped, and associated packaging, will be described for each of the mission areas. The diverse range of materials requiring shipment include spent fuel, irradiated target assemblies, excess plutonium and uranium materials, high level waste canisters, transuranic wastes, mixed and low level wastes, and nuclear weapons stockpile materials and components. Since many of these materials have been in prolonged storage or resulted from disassembly of components, the composition, size and shape of the materials present packaging and certification challenges that need to be met. Over 30 different package designs are required to support the site's missions. Approximately 15 inbound shipping-legs transport materials into the Savannah River Site and the same number (15) of outgoing shipment-legs are carrying materials from the site for further processing or permanent disposal.

  8. Future concepts of pyrometallurgical operations at the Savannah River Plant

    SciTech Connect

    Gray, L.W.; Orth, D.A.; Augsburger, S.T.

    1986-01-01

    For more than three decades, the Savannah River Plant has used the principles of extractive metallurgy for the winning of plutonium from irradiated reactor targets, reactor fuels, and unirradiated scrap and residues. Realizing that at some time in the future the aging facilities at SRP will come to the end of their useful life, the Savannah River Laboratory is assessing the permutations of the various hydro-, pyro-, and electrometallurgy unit operations that could be combined to yield a complete process. Preliminary evaluation suggests that a combination of cation exchange, oxalate precipitation, calcination, hydrofluorination, and calcium reduction would be a reasonable combination of unit operations for Savannah River to use. Several different combinations of process steps offer about the same space requirements when all recycle loops for a complete process are included; each of these unit operations has an adequate technical basis. No single process route appears to offer unique opportunities for technological improvements that can reduce capital and operating costs below those of the suggested route. A group of other alternatives might be promoted to the favored group following sufficient technical development. Research plans are being formulated to determine which, if any, of the alternatives should be promoted to the favored group.

  9. 1997 Savannah River Site annual epidemiologic surveillance report

    SciTech Connect

    2000-06-01

    This report provides a summary of epidemiologic surveillance data collected from Savannah River Site from January 1, 1997 through December 31, 1997. The data were collected by a coordinator at Savannah River Site and submitted to the Epidemiologic Surveillance Data Center located at Oak Ridge Institute for Science and Education, where quality control procedures and preliminary data analyses were carried out. The analyses were interpreted and the final report prepared by the DOE Office of Epidemiologic Studies. The information in this report provides highlights of the data analyses conducted on the 1997 data collected from Savannah River Site. The main sections of the report include: work force characteristics; absences due to injury or illness lasting 5 or more consecutive workdays; workplace illnesses, injuries, and deaths that were reportable to the Occupational Safety and Health Administration (''OSHA-recordable'' events); and disabilities and deaths among current workers. The 199 7 report includes a section on time trends that provides comparative information on the health of the work force from 1994 through 1997.

  10. 1996 Savannah River Site annual epidemiologic surveillance report

    SciTech Connect

    2000-03-01

    This report provides a summary of epidemiologic surveillance data collected from Savannah River Site from January 1, 1996 through December 31, 1996. The data were collected by a coordinator at Savannah River Site and submitted to the Epidemiologic Surveillance Data Center located at Oak Ridge Institute for Science and Education, where quality control procedures and preliminary data analyses were carried out. The analyses were interpreted and the final report prepared by the DOE Office of Epidemiologic Studies. The information in this report provides highlights of the data analyses conducted on the 1996 data collected from Savannah River Site. The main sections of the report include: work force characteristics; absences due to injury or illness lasting 5 or more consecutive workdays; workplace illnesses, injuries, and deaths that were reportable to the Occupational Safety and Health Administration (''OSHA-recordable'' events); and disabilities and deaths among current workers. The 1996 report includes a new section on time trends that provides comparative information on the health of the work force from 1994 through 1996.

  11. THE COLD AND DARK PROCESS AT THE SAVANNAH RIVER SITE

    SciTech Connect

    Gilmour, J; William Austin, W; Cathy Sizemore, C

    2007-01-31

    The deactivation and decommissioning (D&D) of a facility exposes D&D workers to numerous hazards. One of the more serious hazards is coming into contact to hazardous energy sources (e.g. electrical, pressurized steam). At the Savannah River Site (SRS) a formal process for identifying and eliminating sources of hazardous energy was developed and is called ''Cold & Dark''. Several ''near miss'' events involving cutting of energized conductors during D&D work in buildings thought to be isolated identified the need to have a formal process to identify and isolate these potentially hazardous systems. This process was developed using lessons learned from D&D activities at the Rocky Flats Environmental Technology Site (Rocky Flats) in Colorado. The Cold & Dark process defines an isolation boundary (usually a building perimeter) and then systematically identifies all of the penetrations through this boundary. All penetrations that involve hazardous energy sources are then physically air-gapped. The final product is a documented declaration of isolation performed by a team involving operations, engineering, and project management. Once the Cold & Dark declaration is made for a building work can proceed without the usual controls used in an operational facility (e.g. lockout/tagout, arc flash PPE). It is important to note that the Cold & Dark process does not remove all hazards from a facility. Work planning and controls still need to address hazards that can be present from such things as chemicals, radiological contamination, residual liquids, etc., as well as standard industrial hazards.

  12. Design control for the Savannah River Site Consolidated Incineration Facility

    SciTech Connect

    Walker, R.E.; Rider, R.L.

    1991-12-31

    The initiation, development, and control of the design for the Consolidated Incineration Facility at the US Department of Energy Savannah River Site has been, from the inception, a precisely and formally controlled process. A plan was developed and implemented to ensure output properly aligned with approved design criteria and conformed to applicable regulations throughout the design process. The key element of design control was the technical baseline which established the benchmark against which all changes to the design was evaluated. During the conceptual design phase of the project, design criteria were written to reflect the project objectives and functional requirements. Governmental regulations were reviewed to determine permitting and licensing actions required. Hazards assessments were performed to establish design classifications. The resulting design criteria, permitting requirements, and facility classifications were incorporated into the design plan which provided the basis for subsequent design activities. As the project proceeded through the various design phases, design control was maintained according to the design plan. Review of all design products was performed by the project team routinely. Formal independent design reviews were accomplished prior to releasing the design for construction. Alignment between criteria and design output was verified periodically throughout the design process. A formal design change control board was invoked to effect design changes impacting technical baselines. All changes to design initiated following issue for construction also were subject to procedural control.

  13. Design control for the Savannah River Site Consolidated Incineration Facility

    SciTech Connect

    Walker, R.E.; Rider, R.L. )

    1991-01-01

    The initiation, development, and control of the design for the Consolidated Incineration Facility at the US Department of Energy Savannah River Site has been, from the inception, a precisely and formally controlled process. A plan was developed and implemented to ensure output properly aligned with approved design criteria and conformed to applicable regulations throughout the design process. The key element of design control was the technical baseline which established the benchmark against which all changes to the design was evaluated. During the conceptual design phase of the project, design criteria were written to reflect the project objectives and functional requirements. Governmental regulations were reviewed to determine permitting and licensing actions required. Hazards assessments were performed to establish design classifications. The resulting design criteria, permitting requirements, and facility classifications were incorporated into the design plan which provided the basis for subsequent design activities. As the project proceeded through the various design phases, design control was maintained according to the design plan. Review of all design products was performed by the project team routinely. Formal independent design reviews were accomplished prior to releasing the design for construction. Alignment between criteria and design output was verified periodically throughout the design process. A formal design change control board was invoked to effect design changes impacting technical baselines. All changes to design initiated following issue for construction also were subject to procedural control.

  14. Application of UAVs at the Savannah River Site

    SciTech Connect

    Hofstetter, K.J.; Pendergast, M.M.

    1996-08-01

    Small, unmanned aerial vehicles (UAVs) equipped with sensors for physical, chemical, and radiochemical measurements of remote environments have been tested at the Savannah River Site (SRS). A miniature helicopter was used as an aerial platform for testing a variety of sensors with outputs integrated with the flight control system for real-time data acquisition and evaluation. The sensors included a precision magnetometer, two broad band infra-red radiometers, a 1-inch by 1-inch Nal(TI) scintillation detector, and an on-board color video camera. Included in the avionics package was an ultrasonic altimeter, a precision barometer, and a portable Global Positioning System. Two separate demonstration locations at SRS were flown that had been previously characterized by careful sampling and analyses and by aerial surveys at high altitudes. The Steed Pond demonstration site contains elevated levels of uranium in the soil and pond silt due to runoff from one of the site`s uranium fuel and target production areas. The soil at the other site is contaminated with oil bearing materials and contains some buried objects. The results and limitations of the UAV surveys are presented and improvements for future measurements are discussed.

  15. In situ vitrification of soil from the Savannah River Site

    SciTech Connect

    Campbell, B.E.; Buelt, J.L.

    1990-08-01

    Contamination associated with seepage basins and other underground structures at US Department of Energy sites may be effectively remediated by application of in situ vitrification (ISV) technology. In situ vitrification converts contaminated soil and buried wastes into a glass and crystalline block, similar to obsidian commingled with crystalline phases. Two bench-scale tests performed at Pacific Northwest Laboratory (PNL) in September 1989 demonstrated the feasibility of applying ISV to seepage basin soils at the Savannah River Site (SRS) in South Carolina. The two tests were performed on soils spiked with heavy metal and organic contaminants as well as stable radioactive simulants. These soils contain extremely low concentrations of alkali fluxes such as sodium and potassium oxides, which are necessary charge carriers for the ISV process. Tests performed on the low flux-containing soil indicate the soil can be vitrified with special application of the ISV process. Tests showed the hazardous and radioactive simulants were successfully bound in the vitrified product and the organics were mostly destroyed. Additional larger scale testing and evaluation are recommended to further study the feasibility of treating contaminated SRS soil by the ISV process. 13 refs., 12 figs., 7 tabs.

  16. Fracture assessment of Savannah River Reactor carbon steel piping

    SciTech Connect

    Mertz, G.E.; Stoner, K.J.; Caskey, G.R. ); Begley, J.A. )

    1991-01-01

    The Savannah River Site (SRS) production reactors have been in operation since the mid-1950's. One postulated failure mechanism for the reactor piping is brittle fracture of the original A285 and A53 carbon steel piping. Material testing of archival piping determined (1) the static and dynamic tensile properties; (2) Charpy impact toughness; and (3) the static and dynamic compact tension fracture toughness properties. The nil-ductility transition temperature (NDTT), determined by Charpy impact test, is above the minimum operating temperature for some of the piping materials. A fracture assessment was performed to demonstrate that potential flaws are stable under upset loading conditions and minimum operating temperatures. A review of potential degradation mechanisms and plant operating history identified weld defects as the most likely crack initiation site for brittle fracture. Piping weld defects, as characterized by radiographic and metallographic examination, and low fracture toughness material properties were postulated at high stress locations in the piping. Normal operating loads, upset loads, and residual stresses were assumed to act on the postulated flaws. Calculated allowable flaw lengths exceed the size of observed weld defects, indicating adequate margins of safety against brittle fracture. Thus, a detailed fracture assessment was able to demonstrate that the piping systems will not fail by brittle fracture, even though the NDTT for some of the piping is above the minimum system operating temperature.

  17. Reprocessing of nuclear fuels at the Savannah River Plant

    SciTech Connect

    Gray, L.W.

    1986-10-04

    For more than 30 years, the Savannah River Plant (SRP) has been a major supplier of nuclear materials such as plutonium-239 and tritium-3 for nuclear and thermonuclear weapons, plutonium-238 for space exploration, and isotopes of americium, curium, and californium for use in the nuclear research community. SRP is a complete nuclear park, providing most of the processes in the nuclear fuel cycle. Key processes involve fabrication and cladding of the nuclear fuel, target, and control assemblies; rework of heavy water for use as reactor moderator; reactor loading, operation, and unloading; chemical recovery of the reactor transmutation products and spent fuels; and management of the gaseous, liquid, and solid nuclear and chemical wastes; plus a host of support operations. The site's history and the key processes from fabrication of reactor fuels and targets to finishing of virgin plutonium for use in the nuclear weapons complex are reviewed. Emphasis has been given to the chemistry of the recovery and purification of weapons grade plutonium from irradiated reactor targets.

  18. Law enforcement tools available at the Savannah River Site

    SciTech Connect

    Hofstetter, K.J.

    2000-03-29

    A number of nuclear technologies developed and applied at the Savannah River Site in support of nuclear weapons material production and environmental remediation can be applied to problems in law enforcement. Techniques and equipment for high-sensitivity analyses of samples are available to identify and quantify trace elements and establish origins and histories of forensic evidence removed from crime scenes. While some of theses capabilities are available at local crime laboratories, state-of-the-art equipment and breakthroughs in analytical techniques are continually being developed at DOE laboratories. Extensive experience with the handling of radioactive samples at the DOE labs minimizes the chances of cross-contamination of evidence received from law enforcement. In addition to high-sensitivity analyses, many of the field techniques developed for use in a nuclear facility can assist law enforcement personnel in detecting illicit materials and operations, in retrieving of pertinent evidence and in surveying crime scenes. Some of these tools include chemical sniffers, hand-held detectors, thermal imaging, etc. In addition, mobile laboratories can be deployed to a crime scene to provide field screening of potential evidence. A variety of portable sensors can be deployed on vehicle, aerial, surface or submersible platforms to assist in the location of pertinent evidence or illicit operations. Several specific nuclear technologies available to law enforcement and their potential uses are discussed.

  19. Assessment of strontium in the Savannah River Site environment

    SciTech Connect

    Carlton, W.H.; Evans, A.G.; Geary, L.A.; Murphy, C.E. Jr.; Strom, R.N.

    1992-12-31

    This document on strontium is published as a part of the Radiological Assessment Program (RAP). It is the sixth in a series of eight documents on individual radioisotopes released to the environment as a result of SRS (Savannah River Site) operations. Strontium exists in the environment as a result of above-ground nuclear weapons tests, the Chernobyl accident, the destruction of satellite Cosmos 954, small releases from reactors and reprocessing plants, and the operation of industrial, medical, and educational facilities. Strontium has been produced at SRS during the operation of 5 production reactors. About 300 curies of radiostrontium were released into streams in the late 50s and 60s, primarily from leaking fuel elements in reactor storage basins. Smaller quantities were released from the fuel reprocessing operations. About 400 Ci were released to seepage basins. A much smaller quantity, about 2 Ci, was released to the atmosphere. The overall radiological impact of SRS releases on the offsite maximum individual can be characterized by total doses of 6.2 mrem (atmospheric) and 1.4 mrem (liquid), compared with a dose of 12,960 mrem from non-SRS sources during the same period of time. Radiostrontium releases have resulted in a negligible risk to the environment and the population it supports.

  20. VITRIFICATION OF HIGH LEVEL WASTE AT THE SAVANNAH RIVER SITE

    SciTech Connect

    Fox, K.; Peeler, D.

    2009-06-17

    The objective of this study was to experimentally measure the properties and performance of a series of glasses with compositions that could represent high level waste Sludge Batch 5 (SB5) as vitrified at the Savannah River Site Defense Waste Processing Facility. These data were used to guide frit optimization efforts as the SB5 composition was finalized. Glass compositions for this study were developed by combining a series of SB5 composition projections with a group of candidate frits. The study glasses were fabricated using depleted uranium and their chemical compositions, crystalline contents and chemical durabilities were characterized. Trevorite was the only crystalline phase that was identified in a few of the study glasses after slow cooling, and is not of concern as spinels have been shown to have little impact on the durability of high level waste glasses. Chemical durability was quantified using the Product Consistency Test (PCT). All of the glasses had very acceptable durability performance. The results of this study indicate that a frit composition can be identified that will provide a processable and durable glass when combined with SB5.

  1. 33 CFR 117.353 - Atlantic Intracoastal Waterway, Savannah River to St. Marys River.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Atlantic Intracoastal Waterway, Savannah River to St. Marys River. 117.353 Section 117.353 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Georgia §...

  2. 33 CFR 117.353 - Atlantic Intracoastal Waterway, Savannah River to St. Marys River.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Atlantic Intracoastal Waterway, Savannah River to St. Marys River. 117.353 Section 117.353 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Georgia §...

  3. 33 CFR 117.353 - Atlantic Intracoastal Waterway, Savannah River to St. Marys River.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Atlantic Intracoastal Waterway, Savannah River to St. Marys River. 117.353 Section 117.353 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Georgia §...

  4. 33 CFR 117.911 - Atlantic Intracoastal Waterway, Little River to Savannah River.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Atlantic Intracoastal Waterway, Little River to Savannah River. 117.911 Section 117.911 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements South Carolina § 117.911 Atlantic Intracoastal...

  5. Savannah River Site, Liquid Waste Program, Savannah River Remediation American Recovery and Reinvestment Act Benefits and Lessons Learned - 12559

    SciTech Connect

    Schmitz, Mark A.; Crouse, Thomas N.

    2012-07-01

    Utilizing funding provided by the American Recovery and Reinvestment Act (ARRA), the Liquid Waste Program at Savannah River site successfully executed forty-one design, procurement, construction, and operating activities in the period from September 2009 through December 2011. Project Management of the program included noteworthy practices involving safety, integrated project teams, communication, and cost, schedule and risk management. Significant upgrades to plant capacity, progress toward waste tank closure and procurement of needed infrastructure were accomplished. Over 1.5 million hours were worked without a single lost work day case. Lessons Learned were continually identified and applied to enhance the program. Investment of Recovery Act monies into the Liquid Waste Program has ensured continued success in the disposition of radioactive wastes and the closure of high level waste tanks at SRS. The funding of a portion of the Liquid Waste Program at SRS by ARRA was a major success. Significant upgrades to plant capacity, progress toward waste tank closure and procurement of needed infrastructure was accomplished. Integrated Project Teams ensured quality products and services were provided to the Operations customers. Over 1.5 million hours were worked without a single lost work day case. Lessons Learned were continually reviewed and reapplied to enhance the program. Investment of Recovery Act monies into the Liquid Waste Program has ensured continued success in the disposition of radioactive wastes and the closure of high level waste tanks at SRS. (authors)

  6. Close out report for archaeological investigations on the Savannah River Site, South Carolina

    SciTech Connect

    Not Available

    1989-12-01

    The Savannah River Archaeological Research Program (SRARP), South Carolina Institute of Archaeology and Anthropology, University of South Carolina conducted archaeological investigations under contract AC09-81SR10749 entitled Archaeological Investigations at the Department of Energy's Savannah River Plant from July 1981 through September 1987. The major emphasis was upon the completion of a 40% stratified sample of the Savannah River Site (SRS) in order to identify and preserve archaeological resources. The investigations were conducted to bring the Savannah River Operations Office into compliance with specific laws and regulations pertaining to the identification and preservation of archaeological and historical resources on federally owned and controlled properties. 15 refs., 3 figs., 12 tabs.

  7. Land and water use characteristics in the vicinity of the Savannah River Site

    SciTech Connect

    Hamby, D.M.

    1991-03-01

    Routine operations at the Savannah River Site (SRS) result in the release of small amounts of radionuclides to the atmosphere and to the Savannah River. The resulting radiological doses to the offsite maximum individual and the offsite population within 50 miles of the SRS are estimated on a yearly basis. These estimates are generated using dose models prescribed for the commercial nuclear power industry by the Nuclear Regulatory Commission (NRC). The NRC provides default values for dose model parameters for facilities not having enough data to develop site-specific values. A survey of land and water use characteristics for the Savannah River area has been conducted to determine as many site-specific values as possible for inclusion in the dose models used at the SRS. These site parameters include local characteristics of meat, milk, and vegetable production; river recreational activities; and meat, milk, and vegetable consumption rates. The report that follows describes the origin of the NRC default values, the methodology for deriving regional data, the results of the study, and the derivations of region-specific usage and consumption rates. 33 refs., 3 figs., 8 tabs.

  8. Radioactive releases at the Savannah River Site, 1954--1988

    SciTech Connect

    Hetrick, C.S.; Martin, D.K.

    1988-01-01

    Radioactive Releases at the Savannah River Site, 1954--1988 (WSRC-RP-89-737) is the continuation of a series of reports, previously titled Releases of Radioactivity at the Savannah River Plant (DPSU-1-YR-25). The series reflects the use of air and liquid effluent sample analyses in determining the amount of radioactivity released from Savannah River Site (SRS) operations. The identification and characterization of these source terms since plant startup in 1954 have aided Site personnel in confining and limiting the amount of radioactivity released to the environment from SRS facilities. Data contained in this report are used for a variety of purposes, including the calculation of offsite dose estimates and aiding special environmental studies. This document is an effluent/source term report. The report is divided into four summary sections. Summary A details volumes of air and water released from emission sources since plant startup. Summary B lists annual radioactive release data from these emission sources, grouped by nuclide and area. Summary C provides yearly totals of radioactive releases by radionuclide, under the headings Atmospheric,'' Liquid to streams,'' or Liquid to Seepage Basins'' accordingly. Monthly radioactive releases from each emission source from 1986 to 1988 are found in Summary D. Where appropriate, headings in the summary tables have been changed to clarify and simplify emission data (see Appendix B). Additionally, any new discharge points, such as the liquid discharge from the Effluent Treatment Facility (ETF), are included in this report. A listing of 1988 source term and onsite discharge designations is provided in Appendix C. 36 refs.

  9. Assessment of mercury in the Savannah River Site environment

    SciTech Connect

    Kvartek, E.J.; Carlton, W.H.; Denham, M.; Eldridge, L.; Newman, M.C.

    1994-09-01

    Mercury has been valued by humans for several millennia. Its principal ore, cinnabar, was mined for its distinctive reddish-gold color and high density. Mercury and its salts were used as medicines and aphrodisiacs. At SRS, mercury originated from one of the following: as a processing aid in aluminum dissolution and chloride precipitation; as part of the tritium facilities` gas handling system; from experimental, laboratory, or process support facilities; and as a waste from site operations. Mercury is also found in Par Pond and some SRS streams as the result of discharges from a mercury-cell-type chlor-alkali plant near the city of Augusta, GA. Reactor cooling water, drawn from the Savannah River, transported mercury onto the SRS. Approximately 80,000 kg of mercury is contained in the high level waste tanks and 10,000 kg is located in the SWDF. Additional quantities are located in the various seepage basins. In 1992, 617 wells were monitored for mercury contamination, with 47 indicating contamination in excess of the 0.002-ppm EPA Primary Drinking Water Standard. More than 20 Savannah River Ecology Laboratory (SREL) reports and publications pertinent to mercury (Hg) have been generated during the last two decades. They are divided into three groupings: SRS-specific studies, basic studies of bioaccumulation, and basic studies of effect. Many studies have taken place at Par Pond and Upper Three Runs Creek. Mercury has been detected in wells monitoring the groundwater beneath SRS, but not in water supply wells in excess of the Primary Drinking Water Limit of 0.002 ppm. There has been no significant release of mercury from SRS to the Savannah River. While releases to air are likely, based on process knowledge, modeling of the releases indicates concentrations that are well below the SCDHEC ambient standard.

  10. Savannah River Site Patented Technologies Summaries

    SciTech Connect

    Rabold, D.E.

    1995-07-18

    This information represents SRS`s contribution of the DOE technology information network, an internet service coordinated out of Los Alamos. The information provided is strictly DOE-SR-titled and-issued patented technologies including environmental remediation, robotics, sensors, materials science, biomedical applications, hydrogen, and consumer products.

  11. Savannah River Site prioritization of transition activities

    SciTech Connect

    Finley, R.H.

    1993-11-01

    Effective management of SRS conversion from primarily a production facility to other missions (or Decontamination and Decommissioning (D&D)) requires a systematic and consistent method of prioritizing the transition activities. This report discusses the design of a prioritizing method developed to achieve systematic and consistent methods of prioritizing these activities.

  12. Inspection Report on "Employment Verification at Savannah River Site"

    SciTech Connect

    2009-11-01

    We conducted a review at the Savannah River Site to determine if Site subcontractors verified the employment status of all employees in accordance with Federal requirements and, if unauthorized individuals accessed the site. During our field work, we reviewed 600 I-9 Forms from 21 subcontractors to verify whether Site subcontractors were using the I-9 Forms; and if the forms were accurate and complete. We also conducted a judgmental sample of individuals who accessed the Site during a six-month period to determine if there were any documentation anomalies.

  13. Savannah River Site K-Reactor Probabilistic Safety Assessment

    SciTech Connect

    Brandyberry, M.D.; Bailey, R.T.; Baker, W.H.; Kearnaghan, D.P.; O`Kula, K.R.; Wittman, R.S.; Woody, N.D.; Amos, C.N.; Weingardt, J.J.

    1992-12-01

    This report gives the results of a Savannah River Site (SRS) K-Reactor Probabilistic Safety Assessment (PSA). Measures of adverse consequences to health and safety resulting from representations of severe accidents in SRS reactors are presented. In addition, the report gives a summary of the methods employed to represent these accidents and to assess the resultant consequences. The report is issued to provide useful information to the U. S. Department of Energy (DOE) on the risk of operation of SRS reactors, for insights into severe accident phenomena that contribute to this risk, and in support of improved bases for other DOE programs in Heavy Water Reactor safety.

  14. Getting into CAD at the Savannah River Plant

    SciTech Connect

    Scoggins, W.R.

    1984-01-01

    In 1978, the Savannah River Plant (SRP) Project Department was producing approximately 1100 new drawings and 3000 revisions per year, with a force of 30 draftsmen. Design services for the Plant were increasing due to changing programs, obsolescent equipment replacements and added security requirements. This increasing workload greatly increased the engineering drafting backlog. At the same time, many draftsmen were approaching retirement age and were to be replaced with unskilled draftsman trainees. A proposal was presented to management to acquire a Computer Aided Drafting (CAD) system to produce instrument and electrical drawings which comprised 30% of the work load.

  15. Savannah River Site environmental report for 1991. [Contains Glossary

    SciTech Connect

    Arnett, M.W.; Karapatakis, L.K.; Mamatey, A.R.; Todd, J.L.

    1991-01-01

    This report describes environmental activities conducted on and in the vicinity of the Savannah River Site (SRS) in Aiken, S.C., from Jan. 1 to Dec. 31, 1991, with an update on compliance activities through April 1, 1992. The report is a single volume with a separate summary pamphlet highlighting the major findings for 1991. The report is divided into an executive summary and 14 chapters containing information on environmental compliance issues, environmental monitoring methods and programs, and environmental research activities for 1991, as well as historical data from previous years. Analytical results, figures, charts, and data tables relevant to the environmental monitoring program for 1991 at SRS are included.

  16. Environmental Survey preliminary report, Savannah River Plant, Aiken, South Carolina

    SciTech Connect

    Not Available

    1987-08-01

    This report contains the preliminary findings based on the first phase of an Environmental Survey at the Department of Energy (DOE) Savannah River Plant (SRP), located at Aiken, South Carolina. The Survey is being conducted by DOE's Office of Environment, Safety and Health. The following topics are discussed: general site information; air, soil, surface water and ground water; hydrogeology; waste management; toxic and chemical materials; release of tritium oxides; radioactivity in milk; contamination of ground water and wildlife; pesticide use; and release of radionuclides into seepage basins. 149 refs., 44 figs., 53 tabs.

  17. Savannah River Plant saltstone: formulation variability and operating limits

    SciTech Connect

    Langton, C.A.; Wilhite, E.L.

    1988-01-01

    Saltstone is the Savannah River Plant (SRP) wasteform resulting from chemical reactions between low-level defense waste and cementitious solids. Operating limits for the saltstone process were derived from waste specifications, and proportioning limits. Specifications for the waste salt solution include limits on temperature, pH, concentrations of eight inorganic and two organic constituents, total radioactivity, total alpha activity, and concentrations of 13 radionuclides. Specifications for the cementitious solids are based on ASTM standards. Proportioning limits for dry solids and for blended solids to waste solution ratio were based on an experimental design that screened formulations on the basis of processability and leachability (potential impact to groundwater).

  18. Chemical pretreatment of Savannah River Site nuclear waste for disposal

    SciTech Connect

    Hobbs, D.T.; Walker, D.D.

    1992-12-31

    This work describes two processes, Extended Sludge Processing and In-Tank Precipitation, which have been developed and demonstrated at full-scale to pretreat the Savannah River Site High-Level Waste for permanent disposal. These processes will be carried out in waste storage tanks which have been modified for chemical processing. These processes will concentrate the radioactivity into a small volume for vitrification. The bulk of the waste will be sufficiently decontaminated such that it can be disposed of as a low-level waste. The decontaminated waste will be incorporated into a cement wasteform in the Saltstone Facility.

  19. Airborne lidar experiments at the Savannah River Plant

    NASA Technical Reports Server (NTRS)

    Krabill, William B.; Swift, Robert N.

    1985-01-01

    The results of remote sensing experiments at the Department of Energy (DOE) Savannah River Nuclear Facility utilizing the NASA Airborne Oceanographic Lidar (AOL) are presented. The flights were conducted in support of the numerous environmental monitoring requirements associated with the operation of the facility and for the purpose of furthering research and development of airborne lidar technology. Areas of application include airborne laser topographic mapping, hydrologic studies using fluorescent tracer dye, timber volume estimation, baseline characterization of wetlands, and aquatic chlorophyll and photopigment measurements. Conclusions relative to the usability of airborne lidar technology for the DOE for each of these remote sensing applications are discussed.

  20. M-Area basin closure, Savannah River Site

    SciTech Connect

    McMullin, S.R.; Horvath, J.G.

    1991-12-31

    M-Area, on the Savannah River Site, processes raw materials and manufactures fuel and target rods for reactor use. Effluent from these processes were discharged into the M-Area settling basin and Lost Lake, a natural wetland. The closure of this basin began in 1988 and included the removal and stabilization of basin fluids, excavation of all contaminated soils from affected areas and Lost Lake, and placement of all materials in the bottom of the emptied basin. These materials were covered with a RCRA style cap, employing redundant barriers of kaolin clay and geosynthetic material. Restoration of excavated uplands and wetlands is currently underway.

  1. M-Area basin closure, Savannah River Site

    SciTech Connect

    McMullin, S.R.; Horvath, J.G.

    1991-01-01

    M-Area, on the Savannah River Site, processes raw materials and manufactures fuel and target rods for reactor use. Effluent from these processes were discharged into the M-Area settling basin and Lost Lake, a natural wetland. The closure of this basin began in 1988 and included the removal and stabilization of basin fluids, excavation of all contaminated soils from affected areas and Lost Lake, and placement of all materials in the bottom of the emptied basin. These materials were covered with a RCRA style cap, employing redundant barriers of kaolin clay and geosynthetic material. Restoration of excavated uplands and wetlands is currently underway.

  2. Simulations of in situ air stripping demonstration at Savannah River

    SciTech Connect

    Robinson, B.A.; Rosenberg, N.D.; Zyvoloski, G.A.; Viswanathan, H.

    1994-06-01

    This report assesses the performance of the in situ air stripping technology demonstrated at the Savannah River Integrated Demonstration (SRID) site. This technology is a combination of air injection below the water table and vacuum extraction in the vadose zone, using a pair of horizontal wells. Our approach is based on the construction of a site-specific numerical model using the FEHM flow and transport code. We use the model as a tool to investigate improvements to performance, to improve the prediction of the performance of this technology over longer periods of time and at different sites, and to compare performance with other remediation technologies.

  3. Plutonium-238 processing at Savannah River Plant

    SciTech Connect

    Burney, G.A.

    1983-01-01

    Plutonium-238 is produced by irradiating NpO/sub 2/-Al cermet slugs or tubes with neutrons. The neptunium-237 is produced as a by-product when natural or enriched uranium is irradiated with neutrons. The neptunium is separated by solvent extraction and ion exchange and precipitated as neptunium oxalate. Neptunium oxalate is calcined to neptunium oxide and fabricated into targets for irradiation. The irradiation conditions are controlled to produce plutonium with 80 to 90 wt % /sup 238/Pu.

  4. CRITICAL RADIONUCLIDE AND PATHWAY ANALYSIS FOR THE SAVANNAH RIVER SITE

    SciTech Connect

    Jannik, T.

    2011-08-30

    This report is an update to the analysis, Assessment of SRS Radiological Liquid and Airborne Contaminants and Pathways, that was performed in 1997. An electronic version of this large original report is included in the attached CD to this report. During the operational history (1954 to the present) of the Savannah River Site (SRS), many different radionuclides have been released to the environment from the various production facilities. However, as will be shown by this updated radiological critical contaminant/critical pathway analysis, only a small number of the released radionuclides have been significant contributors to potential doses and risks to offsite people. The analysis covers radiological releases to the atmosphere and to surface waters, the principal media that carry contaminants offsite. These releases potentially result in exposure to offsite people. The groundwater monitoring performed at the site shows that an estimated 5 to 10% of SRS has been contaminated by radionuclides, no evidence exists from the extensive monitoring performed that groundwater contaminated with these constituents has migrated off the site (SRS 2011). Therefore, with the notable exception of radiological source terms originating from shallow surface water migration into site streams, onsite groundwater was not considered as a potential exposure pathway to offsite people. In addition, in response to the Department of Energy's (DOE) Order 435.1, several Performance Assessments (WSRC 2008; LWO 2009; SRR 2010; SRR 2011) and a Comprehensive SRS Composite Analysis (SRNO 2010) have recently been completed at SRS. The critical radionuclides and pathways identified in these extensive reports are discussed and, where applicable, included in this analysis.

  5. Sediment accretion in tidal freshwater forests and oligohaline marshes of the Waccamaw and Savannah Rivers, USA

    USGS Publications Warehouse

    Ensign, Scott H.; Hupp, Cliff R.; Noe, Gregory B.; Krauss, Ken W.; Stagg, Camille L.

    2014-01-01

    Sediment accretion was measured at four sites in varying stages of forest-to-marsh succession along a fresh-to-oligohaline gradient on the Waccamaw River and its tributary Turkey Creek (Coastal Plain watersheds, South Carolina) and the Savannah River (Piedmont watershed, South Carolina and Georgia). Sites included tidal freshwater forests, moderately salt-impacted forests at the freshwater–oligohaline transition, highly salt-impacted forests, and oligohaline marshes. Sediment accretion was measured by use of feldspar marker pads for 2.5 year; accessory information on wetland inundation, canopy litterfall, herbaceous production, and soil characteristics were also collected. Sediment accretion ranged from 4.5 mm year−1 at moderately salt-impacted forest on the Savannah River to 19.1 mm year−1 at its relict, highly salt-impacted forest downstream. Oligohaline marsh sediment accretion was 1.5–2.5 times greater than in tidal freshwater forests. Overall, there was no significant difference in accretion rate between rivers with contrasting sediment loads. Accretion was significantly higher in hollows than on hummocks in tidal freshwater forests. Organic sediment accretion was similar to autochthonous litter production at all sites, but inorganic sediment constituted the majority of accretion at both marshes and the Savannah River highly salt-impacted forest. A strong correlation between inorganic sediment accumulation and autochthonous litter production indicated a positive feedback between herbaceous plant production and allochthonous sediment deposition. The similarity in rates of sediment accretion and sea level rise in tidal freshwater forests indicates that these habitats may become permanently inundated if the rate of sea level rise increases.

  6. 33 CFR 100.724 - Annual Augusta Invitational Rowing Regatta; Savannah River, Augusta, GA.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Rowing Regatta; Savannah River, Augusta, GA. 100.724 Section 100.724 Navigation and Navigable Waters... WATERS § 100.724 Annual Augusta Invitational Rowing Regatta; Savannah River, Augusta, GA. (a) Definitions... all non-participants. (2) After the termination of the Invitational Rowing Regatta each day,...

  7. 33 CFR 100.724 - Annual Augusta Invitational Rowing Regatta; Savannah River, Augusta, GA.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Rowing Regatta; Savannah River, Augusta, GA. 100.724 Section 100.724 Navigation and Navigable Waters... WATERS § 100.724 Annual Augusta Invitational Rowing Regatta; Savannah River, Augusta, GA. (a) Definitions... all non-participants. (2) After the termination of the Invitational Rowing Regatta each day,...

  8. 33 CFR 100.724 - Annual Augusta Invitational Rowing Regatta; Savannah River, Augusta, GA.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Rowing Regatta; Savannah River, Augusta, GA. 100.724 Section 100.724 Navigation and Navigable Waters... WATERS § 100.724 Annual Augusta Invitational Rowing Regatta; Savannah River, Augusta, GA. (a) Definitions... all non-participants. (2) After the termination of the Invitational Rowing Regatta each day,...

  9. Waterfowl of the Savannah River Plant: Comprehensive cooling water study. Final report

    SciTech Connect

    Mayer, J.J.; Kennamer, R.A.; Hoppe, R.T.

    1986-06-01

    Thirty-one species of waterfowl have been documented on the Savannah River Plant (SPR). The Savannah River Ecology Laboratory (SREL) has been conducting waterfowl research on the site for the past 15 years. This research has included work on waterfowl utilization of the SRP, wood duck reproductive biology, and waterfowl wintering ecology. Results are described.

  10. Assessment of plutonium in the Savannah River Site environment. Revision 1

    SciTech Connect

    Carlton, W.H.; Evans, A.G.; Geary, L.A.; Murphy, C.E. Jr.; Pinder, J.E.; Strom, R.N.

    1992-12-31

    Plutonium in the Savannah River Site Environment is published as a part of the Radiological Assessment Program (RAP). It is the fifth in a series of eight documents on individual radioisotopes released to the environment as a result of Savannah River Site (SRS) operations. These are living documents, each to be revised and updated on a two-year schedule. This document describes the sources of plutonium in the environment, its release from SRS, environmental transport and ecological concentration of plutonium, and the radiological impact of SRS releases to the environment. Plutonium exists in the environment as a result of above-ground nuclear weapons tests, the Chernobyl accident, the destruction of satellite SNAP 9-A, plane crashes involving nuclear weapons, and small releases from reactors and reprocessing plants. Plutonium has been produced at SRS during the operation of five production reactors and released in small quantities during the processing of fuel and targets in chemical separations facilities. Approximately 0.6 Ci of plutonium was released into streams and about 12 Ci was released to seepage basins, where it was tightly bound by clay in the soil. A smaller quantity, about 3.8 Ci, was released to the atmosphere. Virtually all releases have occurred in F- and H-Area separation facilities. Plutonium concentration and transport mechanisms for the atmosphere, surface water, and ground water releases have been extensively studied by Savannah River Technology Center (SRTC) and ecological mechanisms have been studied by Savannah River Ecology Laboratory (SREL). The overall radiological impact of SRS releases to the offsite maximum individual can be characterized by a total dose of 15 mrem (atmospheric) and 0.18 mrem (liquid), compared with the dose of 12,960 mrem from non-SRS sources during the same period of time (1954--1989). Plutonium releases from SRS facilities have resulted in a negligible impact to the environment and the population it supports.

  11. Geomorphology and geologic characteristics of the Savannah River floodplain in the vicinity of the Savannah River Site, South Carolina and Georgia

    SciTech Connect

    Leeth, D.C. ); Nagle, D.D. )

    1994-03-01

    The potential for migration of contaminated ground water from the US Department of Energy Savannah River Site (SRS) beneath the Savannah River into Georgia (trans-river flow) is a subject of recent environmental concern. The degree of incision of the ancestral Savannah River into the local hydrogeologic framework is a significant consideration in the assessment of trans-river flow. The objective of this investigation is to identify the geologic formations which subcrop beneath the alluvium and the extent to which the river has incised regional confining beds. To meet this objective 18 boreholes were drilled to depths of 25 to 100 feet along three transects across the present floodplain. These borings provided data on the hydrogeologic character of the strata that fill the alluvial valley. The profiles from the borehole transects were compared with electrical conductivity (EM-34) data to ascertain the applicability of this geophysical technique to future investigations.

  12. Geomorphic history of a portion of the Savannah River flood plain, Barnwell County, South Carolina

    SciTech Connect

    Stevenson, A.E.

    1982-01-01

    As a result of an intensive archeological survey undertaken on the Plant, the Savannah River Valley has become the focus of an effort to tie the history of the Savannah River with cultural trends observed in the surrounding highlands. The flood-plain swamp contains well-preserved remnant sedimentologic evidence of former Savannah River occupations. This study utilizes geomorphic detail obtained from low level infra-red aerial photographs of the Savannah River flood plain in the area to interpret and distinguish various types of alluvial depositional environments. Relative temporal succession of the Savannah River across the modern (Holocene) valley floor is determined by evaluation of fluvial trends and their cross-cutting relationships. Sampling of sedimentary deposits for general alluvial stratigraphy and radiocarbon dating of plant detritus determine geomorphic trends and their absolute temporal relationships.

  13. Savannah River aquatic ecology program. Annual report, September 1982-August 1983. Volume II

    SciTech Connect

    Specht, W.; Kania, H.J.; Painter, W.

    1985-04-01

    This report presents the results of macroinvertebrate colonization on Hester Dendy artificial substrate samplers, macroinvertebrate drift studies, periphyton studies, and water quality analyses conducted from September 1982 through August 1983. The objectives were to: (1) determine the taxonomic composition, biomass and density of macroinvertebrates in the Savannah River and tributary creeks in the vicinity of the SRP; (2) determine the taxonomic composition and densities of macroinvertebrates inthe drift communities of the Savannah River and five tributary creeks in the vicinity of the SRP; (3) determine the biomass and chlorophyll a content of periphyton communities in the Savannah River and tributary creeks in the vicinity of the SRP; (4) evaluate water quality data for selected parameters in the Savannah River and major tributary creeks upstream, downstream and in the vicinity of the SRP; and (5) evaluate the possible impacts of the existing and proposed SRP thermal discharges to the periphyton and macroinvertebrate communities of the Savannah River and tributary creeks. 3 figs., 23 tabs.

  14. Biological assessment for the shortnose sturgeon, Acipenser brevirostrum Lesueur 1818, the Savannah River Plant

    SciTech Connect

    Muska, C.; Matthews, R.A.

    1983-10-01

    The shortnose sturgeon (Acipenser brevirostrum) is listed as an endangered species in the United States. Prior to 1982, the presence of shortnose sturgeon had not been documented in the middle reaches of the Savannah River. However, shortnose sturgeon larvae were collected in 1982-1983 near the Savannah River Plant (SRP), a US Department of Energy (DOE) facility, as part of the SRP aquatic ecology program. This biological assessment was prepared to evaluate the potential impacts of present and proposed SRP operations on the shortnose sturgeon. This assessment is based on existing information on the life history and habitat preferences of the shortnose sturgeon, a description of the Savannah River Plant including plant operations which may potentially impact the shortnose sturgeon and consultations with local experts. From this information, it is concluded that the existing and proposed operations (specifically L-Reactor operation) of the Savannah River Plant will not affect the continued existence of the shortnose sturgeon the Savannah River.

  15. Savannah River Site Bagless Transfer Technology Applied at Hanford

    SciTech Connect

    Wong, J.W.

    2001-01-31

    A ''bagless transfer'' process was developed at the Savannah River Site (SRS) to remove radioactive materials from glovebox enclosures for long-term storage in conformance with DOE Standard 3013. This process, unlike the more conventional ''bag-out'' process, produces an all-metal, helium-filled, welded storage container that does not contain materials subject to radiolytic decomposition. A Bagless Transfer System (BTS), utilizing this bagless transfer process, has been in service at SRS since August 1997. It is a semi-automated system that has proven to be very reliable during its three years of operation.The Plutonium Finishing Plant (PFP) at Hanford has a similar need for long-term storage of radioactive materials. The successful operation of the Savannah River Site BTS led to the selection of the same technology to fulfill the packaging need at Hanford. However, there are a number of differences between the existing SRS BTS and the system currently in operation at Hanford. These differences will be discussed in this paper. Additionally, a system is necessary to produce another all-metal, welded container into which the container produced by the BTS can be placed. This container must be in conformance with the criteria specified in DOE-STD-3013 for an outer container. SRS Engineers are developing a system (outer container welder), based on the tungsten inert gas (TIG) welding equipment used in the BTS, to produce this outer container.

  16. Bats of the Savannah River Site and vicinity.

    SciTech Connect

    M.A. Menzel; J.M. Menzel; J.C. Kilgo; W.M. Ford; T.C. Carter; J.W. Edwards

    2003-10-01

    The U.S. Department of Energy's Savannah River Site supports a diverse bat community. Nine species occur there regularly, including the eastern pipistrelle (Pipistrellus subflavus), southeastern myotis (Myotis austroriparius), evening bat (Nycticeius humeralis), Rafinesque's big-eared bat (Corynorhinus rafinesquii), silver-haired bat (Lasionycteris noctivagans), eastern red bat (Lasiurus borealis), Seminole bat (L. seminolus), hoary bat (L. cinereus), and big brown bat (Eptesicus fuscus). There are extralimital capture records for two additional species: little brown bat (M. lucifigus) and northern yellow bat (Lasiurus intermedius). Acoustical sampling has documented the presence of Brazilian free-tailed bats (Tadarida brasiliensis), but none has been captured. Among those species common to the Site, the southeastern myotis and Rafinesque's big-eared bat are listed in South Carolina as threatened and endangered, respectively. The presence of those two species, and a growing concern for the conservation of forest-dwelling bats, led to extensive and focused research on the Savannah River Site between 1996 and 2002. Summarizing this and other bat research, we provide species accounts that discuss morphology and distribution, roosting and foraging behaviors, home range characteristics, habitat relations, and reproductive biology. We also present information on conservation needs and rabies issues; and, finally, identification keys that may be useful wherever the bat species we describe are found.

  17. Rheology of Savannah River Site Tank 51 HLW radioactive sludge

    SciTech Connect

    Ha, B.C.

    1993-01-01

    Savannah River Site (SRS) Tank 51 HLW radioactive sludge represents a major portion of the first batch of sludge to be vitrified in the Defense Waste Processing Facility (DWPF) at SRS. The rheological properties of Tank 51 sludge will determine if the waste sludge can be pumped by the current DWPF process cell pump design and the homogeneity of melter feed slurries. The rheological properties of Tank 51 sludge and sludge/frit slurries at various solids concentrations were measured remotely in the Shielded Cells Operations (SCO) at the Savannah River Technology Center (SRTC) using a modified Haake Rotovisco viscometer system. Rheological properties of Tank 51 radioactive sludge/Frit 202 slurries increased drastically when the solids content was above 41 wt %. The yield stresses of Tank 51 sludge and sludge/frit slurries fall within the limits of the DWPF equipment design basis. The apparent viscosities also fall within the DWPF design basis for sludge consistency. All the results indicate that Tank 51 waste sludge and sludge/frit slurries are pumpable throughout the DWPF processes based on the current process cell pump design, and should produce homogeneous melter feed slurries.

  18. Disposal of Draeger Tubes at Savannah River Site

    SciTech Connect

    Malik, N.P.

    2000-10-13

    The Savannah River Site (SRS) is a Department of Energy (DOE) facility located in Aiken, South Carolina that is operated by the Westinghouse Savannah River Company (WSRC). At SRS Draeger tubes are used to identify the amount and type of a particular chemical constituent in the atmosphere. Draeger tubes rely on a chemical reaction to identify the nature and type of a particular chemical constituent in the atmosphere. Disposal practices for these tubes were identified by performing a hazardous waste evaluation per the Resource Conservation and Recovery Act (RCRA). Additional investigations were conducted to provide guidance for their safe handling, storage and disposal. A list of Draeger tubes commonly used at SRS was first evaluated to determine if they contained any material that could render them as a RCRA hazardous waste. Disposal techniques for Draeger tubes that contained any of the toxic contaminants listed in South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79. 261.24 (b) and/or contained an acid in the liquid form were addressed.

  19. Radiological/toxicological sabotage assessments at the Savannah River Site

    SciTech Connect

    Johnson, H.D.; Pascal, M.D.; Richardson, D.L.

    1995-11-01

    This paper describes the methods being employed by Westinghouse Savannah River Company (WSRC) to perform graded assessments of radiological and toxicological sabotage vulnerability at Savannah River Site (SRS) facilities. These assessments are conducted to ensure that effective measures are in place to prevent, mitigate, and respond to a potential sabotage event which may cause an airborne release of radiological/toxicological material, causing an adverse effect on the health and safety of employees, the public, and the environment. Department of Energy (DOE) Notice 5630.3A, {open_quotes}Protection of Departmental Facilities Against Radiological and Toxicological Sabotage,{close_quotes} and the associated April 1993 DOE-Headquarters guidance provide the requirements and outline an eight-step process for hazardous material evaluation. The process requires the integration of information from a variety of disciplines, including safety, safeguards and security, and emergency preparedness. This paper summarizes WSRC`s approach towards implementation of the DOE requirements, and explains the inter-relationships between the Radiological and Toxicological Assessments developed using this process, and facility Hazard Assessment Reports (HAs), Safety Analysis Reports (SARs), and Facility Vulnerability Assessments (VAs).

  20. Savannah River Site radioiodine atmospheric releases and offsite maximum doses

    SciTech Connect

    Marter, W.L.

    1990-11-01

    Radioisotopes of iodine have been released to the atmosphere from the Savannah River Site since 1955. The releases, mostly from the 200-F and 200-H Chemical Separations areas, consist of the isotopes, I-129 and 1-131. Small amounts of 1-131 and 1-133 have also been released from reactor facilities and the Savannah River Laboratory. This reference memorandum was issued to summarize our current knowledge of releases of radioiodines and resultant maximum offsite doses. This memorandum supplements the reference memorandum by providing more detailed supporting technical information. Doses reported in this memorandum from consumption of the milk containing the highest I-131 concentration following the 1961 1-131 release incident are about 1% higher than reported in the reference memorandum. This is the result of using unrounded 1-131 concentrations of I-131 in milk in this memo. It is emphasized here that this technical report does not constitute a dose reconstruction in the same sense as the dose reconstruction effort currently underway at Hanford. This report uses existing published data for radioiodine releases and existing transport and dosimetry models.

  1. Commercial integration and partnering at Savannah River Site

    SciTech Connect

    Steele, J.R.; Babione, R.A.; Shikashio, L.A.; Wacaster, A.J.; Paterson, A.D.

    1994-06-01

    Savannah River Site (SRS), particularly the Savannah River Technology Center (SRTC) with the experience from the first successful Integrated Technology Demonstration, can provide an excellent foundation for meeting DOE-EM`s objectives with the new DOE-EM five focus area approach. With this in mind, SRTC established an activity to pursue full commercialization of environmental technologies. This report is an assessment of the status of commercialization at SRS and provides recommendations for enhancement as well as some tools critical to implementation. A review was made of the current situation at SRS with regards to taking technology development to commercial fruition. This was done from the perspective of comparing it to known commercialization models and processes. It was found that SRTC already works through many of the steps in these processes. With integration and action-oriented efforts of the inclusion of business and market factors, SRTC could become an aggressive, successful developer of commercialized technologies. Commercial success criteria tools were developed with regards to integrating them with SRTC selection criteria to ensure that all critical factors are covered in technology commercialization project evaluations. Private investors are very clear that their interest lies in funding commercial enterprises, not merely technologies. Mobilizing private capital is critical to real job growth and long-term economic development. Also, potential industry partners were identified that are willing to be involved with SRS` technology applications and regional development efforts. As another important component to success, regional support organizations were reviewed and evaluated.

  2. Airborne lidar experiments at the Savannah River Plant, June 1985

    SciTech Connect

    Krabill, W.B.; Swift, R.N.

    1987-09-01

    Results are presented from a series of studies conducted at the Department of Energy (DOE) Savannah River Plant (SRP) with the NASA Airborne Oceanographic Lidar (AOL). These studies included a topographic survey of a {approximately}1000 acre lake basin (presently designated L Lake) which had been excavated for use as a cooling pond for L Reactor; a study of the movement of discharged cooling water in Pond C and the warm arm of Par Pond using Rhodamine WT dye as a tag; initial baseline studies of the vegetation cover of the Steel Creek corridor (through which the outflow of L Lake is carried to the Savannah River); and a demonstration of potential forestry applications of the AOL. These investigations were conducted over a 3-day period in June 1985. The AOL is an advanced airborne laser system capable of making temporal or time history measurements of laser backscatter (bathymetry mode) or spectral measurements of laser induced fluorescence from waterborne constituents (fluorosensing mode). The AOL is flown together with auxiliary instruments and camera systems on board a four engine P-3A aircraft. Recent modifications to the AOL allow in-flight changes between the two basic operational modes of the instrument which permitted the topographic study to be conducted on the same flights as the fluorescent dye study. The L Lake topographic survey represents a state-of-the-art demonstration of airborne laser surveying capability.

  3. Savannah River Site Approved Site Treatment Plan, 1998 Annual Update

    SciTech Connect

    Lawrence, B.; Berry, M.

    1998-03-01

    The U.S. Department of Energy, Savannah River Operations Office (DOE- SR),has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume I. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore,pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021.Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW.The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  4. Radioactive effluents in Savannah River. Summary report for 1992

    SciTech Connect

    Winn, W.G.

    1993-09-21

    During 1992, the radioactive effluents in the Savannah River were less than those observed in 1991. Vogtle reported no significant releases in 1992, and in earlier years Vogtle improvements in pre-processing their releases had already effected a decreasing trend in release levels. Their effluents continue to be dominated by {sup 58}Co, which had a maximum concentration of only 0.068 pCi/L, which is just 1/3 of the maximum observed in 1991. Many of the other man-made radionuclides observed in earlier years have now decreased to where some are not even detected, and no new radionuclides were detected in the 1992 Vogtle effluents. In addition to {sup 58}Co, low levels of {sup 60}Co were frequently observed, but only traces of {sup 54}Mn and {sup 95}Nb were observed. Contrary to earlier years no {sup 51}Cr, {sup 57}Co, {sup 59}Fe, or {sup 95}Zr were seen in 1992. Tritium and {sup 137}Cs were also monitored, but their levels generally remain consistent with known SRS sources. The maximum tritium observed near Vogtle was 2 pCi,/mL. The maximum downstream tritium was higher (3.8 pCi/mL), primarily due to the tritium release from K-Reactor in December 1991; however, the levels had abated significantly prior to collection of the tritium samples of the present study. In addition to natural sources, the general levels in the Savannah River are due to routine releases from the effluent treatment facility and seepage basin migration into plant streams that flow into the river.

  5. D&D Characterization of the 232-F Old Tritium Facility at the Savannah River Site

    SciTech Connect

    Scallon, K.L.; England, J.L.

    1995-01-17

    The 232-F ``Old Tritium Facility`` operated in the 1950s as the first tritium production facility at the Savannah River Site (SRS). In 1957, the 232-F operation ceased with tritium production turned over to a larger, technologically improved facility at SRS. The 232-F Facility was abandoned in 1958 and the process areas have remained contaminated with radiological, hazardous and mixed constituents. Decontamination and decommissioning (D&D) of the 232-F Facility is scheduled to occur in the years 1995-1996. This paper presents the D&D characterization efforts for the 232-F Facility.

  6. Assessment of Neptunium, Americium, and Curium in the Savannah River Site Environment

    SciTech Connect

    Carlton, W.H.

    1997-12-17

    A series of documents has been published in which the impact of various radionuclides released to the environment by Savannah River Site (SRS) operations has been assessed. The quantity released, the disposition of the radionuclides in the environment, and the dose to offsite individuals has been presented for activation products, carbon cesium, iodine, plutonium, selected fission products, strontium, technetium, tritium, uranium, and the noble gases. An assessment of the impact of nonradioactive mercury also has been published.This document assesses the impact of radioactive transuranics released from SRS facilities since the first reactor became operational late in 1953. The isotopes reported here are 239Np, 241Am, and 244Cm.

  7. Integration of Environmental Compliance at the Savannah River Site - 13024

    SciTech Connect

    Hoel, David; Griffith, Michael

    2013-07-01

    The Savannah River Site (SRS) is a large federal installation hosting diverse missions and multiple organizations with competing regulatory needs. Accordingly, there was a need to integrate environmental compliance strategies to ensure the consistent flow of information between Department of Energy-Savannah River (DOE-SR), the regulatory agencies and other interested parties. In order to meet this objective, DOE and major SRS contractors and tenants have committed to a strategy of collaboratively working together to ensure that a consistent, integrated, and fully coordinated approach to environmental compliance and regulator relationships is maintained. DOE-SR and Savannah River Nuclear Solutions, LLC, the SRS management and operations contractor, have established an environmental compliance integration process that provides for the consistent flow down of requirements to projects, facilities, SRS contractors, and subcontractors as well as the upward flow of information to assist in the early identification and resolution of environmental regulatory issues and enhancement of compliance opportunities. In addition, this process strongly fosters teamwork to collaboratively resolve complex regulatory challenges, promote pollution prevention and waste minimization opportunities to advance site missions in a manner that balances near-term actions with the long-term site vision, while being protective of human health and the environment. Communication tools are being utilized, some with enhancements, to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. SRS internal regulatory integration is accomplished through a variety of informational exchange forums (e.g., Challenges, Opportunities and Resolution (COR) Team, DOE's Joint Site Regulatory Integration Team, and the Senior Environmental Managers Council (SEMC)). SRS communications and problem-solving with the regulatory agencies have been enhanced through formation of an

  8. Hanford and Savannah River Site Programmatic and Technical Integration

    SciTech Connect

    Ramsey, William Gene

    2013-08-15

    Abstract only. The Hanford Site and the Savannah River Site (SRS) were the primary plutonium production facilities within the U.S. nuclear weapons complex. Radioactive wastes were generated as part of these missions and are stored in similar fashion. The majority of radioactivity maintained by the two sites is located in underground carbon steel tanks in the physical form of supernatant, saltcake, or sludge. Disposition of SRS tank waste is ongoing by converting it into glass (pathway for sludge and radionuclides separated from supernatant or dissolved saltcake) or cement (pathway for the decontaminated supernatant and dissolved saltcake). Tank closure activity has also begun at SRS and will continue for the duration of mission. The Hanford tank waste inventory is roughly 2/3rds larger than SRS's by volume- but nominally half the radioactivity. The baseline disposition path includes high-level and low-activity waste vitrification with separate disposition of contact-handled transuranic tank waste. Retrieval of tank waste from aging single­ shell tanks (SSTs) into double-shell tanks (DSTs) is currently ongoing. As vitrification commences later this decade, Hanford will be in a similar operations mode as SRS. Site integration is increasing as the missions align. The ongoing integration is centered on key issues that impact both sites- regardless of mission timeframe. Three recent workshop exchanges have been held to improve communication with the primary intent of improving operations and technical work organization. The topics of these workshops are as follows: DST space utilization, optimization, and closure; Waste Feed Qualification; and, Cementitious Waste Forms. Key goals for these and future exchanges include aligning research and technology, preparing for joint initiatives (to maximize budgetary value for the customer), and reviewing lessons learned. Each site has played a leading role in the development of technology and operational practices that can be

  9. Radionuclide limits for vault disposal at the Savannah River Site

    SciTech Connect

    Cook, J.R.

    1992-02-04

    The Savannah River Site is developing a facility called the E-Area Vaults which will serve as the new radioactive waste disposal facility beginning early in 1992. The facility will employ engineered below-grade concrete vaults for disposal and above-grade storage for certain long-lived mobile radionuclides. This report documents the determination of interim upper limits for radionuclide inventories and concentrations which should be allowed in the disposal structures. The work presented here will aid in the development of both waste acceptance criteria and operating limits for the E-Area Vaults. Disposal limits for forty isotopes which comprise the SRS waste streams were determined. The limits are based on total facility and vault inventories for those radionuclides which impact groundwater, and or waste package concentrations for those radionuclides which could affect intruders.

  10. Quantitative studies of Savannah River aquatic insects, 1959--1985

    SciTech Connect

    Soltis, R.; Hart, D.; Nagy, T.

    1986-10-30

    As part of a long-term study of water quality patterns, scientists from the Academy of Natural Sciences have collected aquatic insects from artificial substrates placed at several stations in Savannah River. This report presents the first detailed compilation and analysis of this substantial data base, and examines patterns of variations of insect distribution and abundance (both spatial and temporal) during the last quarter century. Data on the number of individuals of various taxa found in the insect traps were obtained from tables in the Academy`s cursory reports. Computer data files created from these records were subjected to extensive statistical analyses in order to examine variation among stations, seasons and years in the abundances of major taxa and various aggregate properties of the insect assemblage. Although a total of 83 taxa were collected over the 27-year study, 10 taxa accounted for nearly 80% of the individuals collected from the traps, hence there 10 taxa were analyzed more intensively.

  11. Quantitative studies of Savannah River aquatic insects, 1959--1985

    SciTech Connect

    Soltis, R.; Hart, D.; Nagy, T.

    1986-10-30

    As part of a long-term study of water quality patterns, scientists from the Academy of Natural Sciences have collected aquatic insects from artificial substrates placed at several stations in Savannah River. This report presents the first detailed compilation and analysis of this substantial data base, and examines patterns of variations of insect distribution and abundance (both spatial and temporal) during the last quarter century. Data on the number of individuals of various taxa found in the insect traps were obtained from tables in the Academy's cursory reports. Computer data files created from these records were subjected to extensive statistical analyses in order to examine variation among stations, seasons and years in the abundances of major taxa and various aggregate properties of the insect assemblage. Although a total of 83 taxa were collected over the 27-year study, 10 taxa accounted for nearly 80% of the individuals collected from the traps, hence there 10 taxa were analyzed more intensively.

  12. New instrument calibration facility for the DOE Savannah River Site

    SciTech Connect

    Wilkie, W.H.; Polz, E.J.

    1993-12-31

    A new laboratory facility is being designed, constructed, and equipped at the Savannah River Site (SRS) as a fiscal year 1992 line item project. This facility will provide space and equipment for test, evaluation, repair, maintenance, and calibration of radiation monitoring instrumentation. The project will replace an obsolete facility and will allow implementation of program upgrades necessary to meet ANSI N323 requirements and National Voluntary Laboratory Accreditation Program (NVLAP) criteria for accreditation of federally owned secondary calibration laboratories. An outline of the project is presented including description, scope, cost, management organization, chronology, and current status. Selected design criteria and their impacts on the project are discussed. The upgraded SRS calibration program is described, and important features of the new facility and equipment that will accommodate this program are listed. The floor plan for the facility is shown, and equipment summaries and functional descriptions for each area are provided.

  13. Sanitary landfill groundwater quality assessment plan Savannah River Site

    SciTech Connect

    Wells, D.G.; Cook, J.W.

    1990-06-01

    This assessment monitoring plan has been prepared in accordance with the guidance provided by the SCDHEC in a letter dated December 7, 1989 from Pearson to Wright and a letter dated October 9, 1989 from Keisler to Lindler. The letters are included a Appendix A, for informational purposes. Included in the plan are all of the monitoring data from the landfill monitoring wells for 1989, and a description of the present monitoring well network. The plan proposes thirty-two new wells and an extensive coring project that includes eleven soil borings. Locations of the proposed wells attempt to follow the SCDHEC guidelines and are downgradient, sidegradient and in the heart of suspected contaminant plumes. Also included in the plan is the current Savannah River Site Sampling and Analysis Plan and the well construction records for all of the existing monitoring wells around the sanitary landfill.

  14. Savannah River Archaeological Research Program: Annual report, FY 1988

    SciTech Connect

    Hanson, G.T.

    1988-08-30

    The past year has witnessed the continuation of the SRARP tradition of scholarly research through contract, grant and volunteer support. Archaeological opportunities have been provided to the professional, student and avocational communities through a range of projects and programs. With the implementation of a new cooperative grant, the scope of SRARP research and public service activities will continue to examine the prehistoric and historic archaeological records of the region and to present objectively these results to professional and avocational audiences. During the forthcoming year (FY 1989) the SRARP will continue to conduct and facilitate archaeological research within the Savannah River valley for the purpose of better understanding the early history and prehistory of the region.

  15. October 1, 1989 tornado at the Savannah River Site

    SciTech Connect

    Parker, M.J.; Kurzeja, R.J.

    1990-01-01

    A tornado with wind speeds in the 113 to 157 mph range struck the southern portion of the Savannah River Site near Aiken, SC at around 7:30 pm on October 1, 1989. The tornado was spawned from a severe thunderstorm with a height of 57,000 ft in a warm and humid air mass. Two million dollars in timber damage occurred over 2,500 acres along a ten-mile swath, but no onsite structural damage or personal injury occurred. Tree-fall patterns indicated that some of this damage was the result of thunderstorm downbursts which accompanied the tornado. Ground-based and aerial photography showed both snapped and mowed over trees which indicate that the tornado was elevated at times. 4 refs., 25 figs., 2 tabs.

  16. Flood Hazard Assessment for the Savannah River Site

    SciTech Connect

    Chen, K.F.

    1999-07-08

    'A method was developed to determine the probabilistic flood elevation curves for certain Savannah River Site (SRS) facilities. This paper presents the method used to determine the probabilistic flood elevation curve for F-Area due to runoff from the Upper Three Runs basin. Department of Energy (DOE) Order 420.1, Facility Safety, outlines the requirements for Natural Phenomena Hazard (NPH) mitigation for new and existing DOE facilities. The NPH considered in this paper is flooding. The facility-specific probabilistic flood hazard curve defines as a function of water elevation the annual probability of occurrence or the return period in years. Based on facility-specific probabilistic flood hazard curves and the nature of facility operations (e.g., involving hazardous or radioactive materials), facility managers can design permanent or temporary devices to prevent the propagation of flood on site, and develop emergency preparedness plans to mitigate the consequences of floods.'

  17. Savannah River Plant emergency response: Environmental transport and assessment

    SciTech Connect

    Addis, R.P.

    1988-01-01

    The ability to evaluate rapidly the possible consequences of inadvertent releases of hazardous pollutants to the environment is vital for the safe operation of most industrial plants. The Savannah River Plant has developed an emergency response system which integrates environmental observations and computer predictions to provide relevant, reliable, and timely information to decision makers. Experience has shown that the interdependence of all components of an emergency response system requires that the system must be well integrated and coordinated. Research and development is an integral component of the Emergency Response Program. It is designed to increase knowledge of environmental transport and diffusion, and to develop technologies to improve the emergency response system. This paper describes the SRP emergency response system, discusses the importance of reliability through system integration, and indicates the role played by research and development in maintaining a vital emergency response system. 10 refs., 7 figs.

  18. Root cause analysis at the Savannah River Plant

    SciTech Connect

    Paradies, M; Busch, D

    1988-01-01

    Events (or near misses) provide important information about ways to improve plant performance. Any particular event may have several /open quotes/root causes/close quotes/ that need correcting to prevent recurrence of the event and, thereby, improve the safety of the plant. Also, by reviewing a large number of events, one can identify cause trends or /open quotes/generic concerns./close quotes/ A method has been developed at Savannah River Plant (SRP) to systematically evaluate events, identify their root causes, record the root causes, and analyze the root cause trends. By providing a systematic method to identify correctable root causes, the system helps the event investigator ask the right questions during the investigation. It also provides an independent safety analysis group and management with statistics indicating existing and developing trouble spots. 3 refs., 4 figs.

  19. SPENT FUEL MANAGEMENT AT THE SAVANNAH RIVER SITE

    SciTech Connect

    Vormelker, P; Robert Sindelar, R; Richard Deible, R

    2007-11-03

    Spent nuclear fuels are received from reactor sites around the world and are being stored in the L-Basin at the Savannah River Site (SRS) in Aiken, South Carolina. The predominant fuel types are research reactor fuel with aluminum-alloy cladding and aluminum-based fuel. Other fuel materials include stainless steel and Zircaloy cladding with uranium oxide fuel. Chemistry control and corrosion surveillance programs have been established and upgraded since the early 1990's to minimize corrosion degradation of the aluminum cladding materials, so as to maintain fuel integrity and minimize personnel exposure from radioactivity in the basin water. Recent activities have been initiated to support additional decades of wet storage which include fuel inspection and corrosion testing to evaluate the effects of specific water impurity species on corrosion attack.

  20. Beneficially reusing LLRW the Savannah River Site Stainless Steel Program

    SciTech Connect

    Boettinger, W.L.

    1993-09-09

    With 68 radioactively contaminated excess Process Water Heat Exchangers the Savannah River Site launched its program to turn potential LLRW metal liabilities into assets. Each Heat Exchanger contains approximately 100 tons of 304 Stainless Steel and could be disposed as LLRW by land burial. Instead the 7000 tons of metal will be recycled into LLRW, HLW, and TRU waste containers thereby eliminating the need for near term land disposal and also eliminating the need to add more clean metal to the waste stream. Aspects of the partnership between DOE and Private Industry necessary to accomplish this new mission are described. A life cycle cost analysis associated with past practices of using carbon steel containers to indefinitely store material (contributing to the creation of today`s legacy waste problems) is presented. The avoided cost calculations needed to support the economics of the ``Indifference`` decision process in assessing the Beneficial Reuse option relative to the Burial option are described.

  1. SIMULANT DEVELOPMENT FOR SAVANNAH RIVER SITE HIGH LEVEL WASTE

    SciTech Connect

    Stone, M; Russell Eibling, R; David Koopman, D; Dan Lambert, D; Paul Burket, P

    2007-09-04

    The Defense Waste Processing Facility (DWPF) at the Savannah River Site vitrifies High Level Waste (HLW) for repository internment. The process consists of three major steps: waste pretreatment, vitrification, and canister decontamination/sealing. The HLW consists of insoluble metal hydroxides (primarily iron, aluminum, magnesium, manganese, and uranium) and soluble sodium salts (carbonate, hydroxide, nitrite, nitrate, and sulfate). The HLW is processed in large batches through DWPF; DWPF has recently completed processing Sludge Batch 3 (SB3) and is currently processing Sludge Batch 4 (SB4). The composition of metal species in SB4 is shown in Table 1 as a function of the ratio of a metal to iron. Simulants remove radioactive species and renormalize the remaining species. Supernate composition is shown in Table 2.

  2. Saltstone processing startup at the Savannah River Plant

    SciTech Connect

    Wilhite, E.L.; Langton, C.A.; Sturm, H.F.; Hooker, R.L.; Occhipinti, E.S.

    1988-01-01

    High-level nuclear wastes are stored in large underground tanks at the Savannah River Plant. Processing of this waste in preparation for ultimate disposal will begin in 1988. The waste will be processed to separate the high-level radioactive fraction from the low-level radioactive fraction. The separation will be made in existing waste tanks by a process combining precipitation, adsorption, and filtration. The high-level fraction will be vitrified into borosilicate glass in the Defense Waste Processing Facility (DWPF) for permanent disposal in a federal repository. The low-level fraction (decontaminated salt solution) will be mixed with a cementitious slag-flyash blend. The resulting wasteform, ''saltstone,'' will be disposed of onsite by emplacement in an engineered facility. Waste properties, disposal facility details, and wasteform characteristics are discussed. In particular, details of saltstone processing, focusing on experience obtained from facility startup, are presented. 9 refs., 5 figs., 6 tabs.

  3. The Savannah River Technology Center, a leader in sensor technology

    SciTech Connect

    Stewart, W.C.

    1993-12-01

    This publication highlights the capabilities and achievements of the Savannah River Technology Center in the field of sensor technology. Sensors are developed to provide solutions for environmental and chemical analysis. Most of their sensor systems are based upon fiber optics. Fiber optic probes function in three main modes: as a reflected light probe, from opaque samples; as a transreflectance probe, which sample light reflected back from samples which can pass light; and a flow cell, which monitors light transmitted through a path which passes the process stream being tested. The sensor group has developed fiber optic based temperature probes, has combined fiber optics with sol-gel technology to monitor process streams using chemical indicators, has done development work on slip stream on-line sampling of chemical process streams, has developed software to aid in the analysis of chemical solutions, and has applied this technology in a wide range of emerging areas.

  4. The Savannah River Site's Groundwater Monitoring Program: Second quarter 1992

    SciTech Connect

    Rogers, C.D. )

    1992-10-07

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Since 1991, the flagging criteria have been based on the federal Environmental Protection Agency (EPA) drinking water standards and on method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1992 are listed in this report.

  5. The Savannah River Site's Groundwater Monitoring Program: Fourth quarter 1991

    SciTech Connect

    Rogers, C.D. )

    1992-06-02

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During fourth quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from fourth quarter 1991 are listed in this report.

  6. The Savannah River Site's Groundwater Monitoring Program, second quarter 1990

    SciTech Connect

    Not Available

    1991-02-07

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1990 (April through June) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1990 are listed in this report.

  7. UV disinfection pilot plant study at the Savannah River Site

    SciTech Connect

    Huffines, R.L.; Beavers, B.A.

    1993-01-01

    An ultraviolet light disinfection system pilot plant was operated at the Savannah River Site Central Shops sanitary wastewater treatment package plant July 14, 1992 through August 13, 1992. The purpose was to determine the effectiveness of ultraviolet light disinfection on the effluent from the small package-type wastewater treatment plants currently used on-site. This pilot plant consisted of a rack of UV lights suspended in a stainless steel channel through which a sidestream of effluent from the treatment plant clarifier was pumped. Fecal coliform analyses were performed on the influent to and effluent from the pilot unit to verify the disinfection process. UV disinfection was highly effective in reducing fecal coliform colonies within NPDES permit limitations even under process upset conditions. The average fecal coliform reduction exceeded 99.7% using ultraviolet light disinfection under normal operating conditions at the package treatment plants.

  8. UV disinfection pilot plant study at the Savannah River Site

    SciTech Connect

    Huffines, R.L.; Beavers, B.A.

    1993-05-01

    An ultraviolet light disinfection system pilot plant was operated at the Savannah River Site Central Shops sanitary wastewater treatment package plant July 14, 1992 through August 13, 1992. The purpose was to determine the effectiveness of ultraviolet light disinfection on the effluent from the small package-type wastewater treatment plants currently used on-site. This pilot plant consisted of a rack of UV lights suspended in a stainless steel channel through which a sidestream of effluent from the treatment plant clarifier was pumped. Fecal coliform analyses were performed on the influent to and effluent from the pilot unit to verify the disinfection process. UV disinfection was highly effective in reducing fecal coliform colonies within NPDES permit limitations even under process upset conditions. The average fecal coliform reduction exceeded 99.7% using ultraviolet light disinfection under normal operating conditions at the package treatment plants.

  9. Epidemiologic surveillance. Annual report for Savannah River Site

    SciTech Connect

    1997-09-01

    Epidemiologic surveillance at US Department of Energy (DOE) facilities consists of regular and systematic collection, analysis, and interpretation of data on absences due to illness and injury in the work force. Its purpose is to provide an early warning system for health problems occurring among employees at participating sites. In this annual report, the 1994 morbidity data for the Savannah River Site (SRS) are summarized. These analyses focus on absences of 5 or more consecutive workdays occurring among workers aged 16-75 years. They are arranged in five sets of tables that present: (1) the distribution of the labor force by occupational category and salary status; (2) the absences per person, diagnoses per absences, and diagnosis rates for the whole work force; (3) diagnosis rates by type of disease or injury; (4) diagnosis rates by occupational category; and (5) relative risks for specific types of disease or injury by occupational category.

  10. Neutron dose and energy spectra measurements at Savannah River Plant

    SciTech Connect

    Brackenbush, L.W.; Soldat, K.L.; Haggard, D.L.; Faust, L.G.; Tomeraasen, P.L.

    1987-08-01

    Because some workers have a high potential for significant neutron exposure, the Savannah River Plant (SRP) contracted with Pacific Northwest Laboratory (PNL) to verify the accuracy of neutron dosimetry at the plant. Energy spectrum and neutron dose measurements were made at the SRP calibrations laboratory and at several other locations. The energy spectra measurements were made using multisphere or Bonner sphere spectrometers,/sup 3/He spectrometers, and NE-213 liquid scintillator spectrometers. Neutron dose equivalent determinations were made using these instruments and others specifically designed to determine dose equivalent, such as the tissue equivalent proportional counter (TEPC). Survey instruments, such as the Eberline PNR-4, and the thermoluminescent dosimeter (TLD)-albedo and track etch dosimeters (TEDs) were also used. The TEPC, subjectively judged to provide the most accurate estimation of true dose equivalent, was used as the reference for comparison with other devices. 29 refs., 43 figs., 13 tabs.

  11. SALT CORE SAMPLING EVOLUTION AT THE SAVANNAH RIVER SITE

    SciTech Connect

    Nance, T; Daniel Krementz, D; William Cheng, W

    2007-11-29

    The Savannah River Site (SRS), a Department of Energy (DOE) facility, has over 30 million gallons of legacy waste from its many years of processing nuclear materials. The majority of waste is stored in 49 buried tanks. Available underground piping is the primary and desired pathway to transfer waste from one tank to another until the waste is delivered to the glass plant, DWPF, or the grout plant, Saltstone. Prior to moving the material, the tank contents need to be evaluated to ensure the correct destination for the waste is chosen. Access ports are available in each tank top in a number of locations and sizes to be used to obtain samples of the waste for analysis. Material consistencies vary for each tank with the majority of waste to be processed being radioactive salts and sludge. The following paper describes the progression of equipment and techniques developed to obtain core samples of salt and solid sludge at SRS.

  12. Consolidated Incineration Facility, Savannah River Site. Environmental Assessment

    SciTech Connect

    Not Available

    1992-12-01

    This environmental assessment (EA) was prepared by the US Department of Energy (DOE) to assess the potential impacts associated with the siting, construction, and operation of the proposed Consolidated Incineration Facility (CIF), at the Savannah River Site, Aiken, South Carolina. The text of the document is unchanged from the EA issued in June 1992, with the following three exceptions: (1) Section 2.1 refers to recent solid waste forecast information; (2) Section 4.5.1 deletes the reference to dioxin emission standards; and (3) a footnote to Section 4.6.2 includes the results of a morr, conservative risk factor. An additional appendix has also been added to the EA. Appendix B presents comments received on the June 1992 EA and the Proposed FONSI from federal, state, and local agencies, interest groups, and individuals. Appendix B also contains both general and specific DOE responses to these comments.

  13. HyTech - The Hydrogen Technology Laboratory at Savannah River

    SciTech Connect

    Motyka, T.; Knight, J.R.; Heung, L.K.; Lee, M.W.

    1995-12-31

    SRS recently announced the formation of the Hydrogen Technology Laboratory (HyTech) to work with industry and government in developing technologies based on the site`s four decades of experience with tritium and other forms of H. HyTech will continue to sustain the site`s ongoing role in H technology applications for defense programs. In addition, the laboratory will work with the chemical, transportation, power, medical, and other industries to develop and test related technologies. HyTech, which is located in the Savannah River Technology Center, will make use of its facilities and staff, as well as the infrastructure within the site`s Tritium Facilities. More than 80 SRS scientists, engineers, and technical professionals with backgrounds in chemistry, engineering, materials science, metallurgy, physics, and computer science will work with the laboratory. This paper describes some of HyTech`s current initiatives in the area of H storage, transportation, and energy applications.

  14. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  15. Status of Spent Fuel Storage at Savannah River Site

    SciTech Connect

    Bickley, D.W.

    2001-09-14

    As Savannah River Site continues to be the primary receipt and storage facility for Aluminum based research reactor fuel, a number of facility improvements continue to be implemented which enhance the storage facilities while reducing the long term operating cost. The L basin facility improvements include projects which allow handling of the TN7/2 and LWT casks, a new sandfilter, and a project to modernize the cask handling cranes. Also, a project is under construction that will demonstrate the ability of a melt-dilute process to prepare research reactor fuel for disposal in a national repository. In an effort to provide the most cost effective long term storage of material, a project is underway to de-inventory the RBOF storage basin and provide storage for all future research reactor fuels in L basin.

  16. Flood Hazard Recurrence Frequencies for the Savannah River Site

    SciTech Connect

    Chen, K.F.

    2001-07-11

    Department of Energy (DOE) regulations outline the requirements for Natural Phenomena Hazard (NPH) mitigation for new and existing DOE facilities. The NPH considered in this report is flooding. The facility-specific probabilistic flood hazard curve defines, as a function of water elevation, the annual probability of occurrence or the return period in years. The facility-specific probabilistic flood hazard curves provide basis to avoid unnecessary facility upgrades, to establish appropriate design criteria for new facilities, and to develop emergency preparedness plans to mitigate the consequences of floods. A method based on precipitation, basin runoff and open channel hydraulics was developed to determine probabilistic flood hazard curves for the Savannah River Site. The calculated flood hazard curves show that the probabilities of flooding existing SRS major facilities are significantly less than 1.E-05 per year.

  17. Sorption properties of carbon-14 on Savannah River Plant soil

    SciTech Connect

    McIntyre, P.F.

    1988-10-18

    Batch experiments performed using {sup 14}C, Savannah River Plant (SRP) soil, and SRP burial ground groundwater indicate that the distribution coefficient, or K{sub d}, for {sup 14}C in the form of carbonates is typically 2 ml/g after 7 hours of equilibration and 55 ml/g after 72 hours. These results were obtained for samples containing {sup 14}C concentrations ranging from 4.2 nCi/ml up to 40.9 nCi/ml. For comparison the concentration of {sup 14}C in the sump leachate of the defense waste lysimeters 1 have ranged from 0.06 nCi/ml to 0.9 nCi/ml.

  18. Decontamination and decommissioning experience at the Savannah River Site

    SciTech Connect

    Monson, R.W.

    1994-07-01

    A continuing concern within the DOE complex is how to address the retirement contains special of a facility which nuclear material (SNM). When the life expectancy of a facility has been reached, decisions must be made pertaining to (1) rial from the facility, removing the mate (2) accounting for the material and (3) final disposition of the material. This paper will discuss such a decontamination and decommissioning (D&D) process which we are presently dealing with at the Savannah River Site. The process must follow DOE Order 5633.3A as well as internal Company procedures regarding MC&A. In some D&D cases the material can be exempt from the DOE Order when all of the following criteria are met: (1) the material has been declared waste, (2) the material has been written off the MC&A books, and (3) the material is under the control of a waste management organization.

  19. TESTING OF THE RADBALL TECHNOLOGY AT SAVANNAH RIVER NATIONAL LABORATORY

    SciTech Connect

    Farfan, E.; Foley, T.

    2010-02-10

    The United Kingdom's National Nuclear Laboratory (NNL) has developed a remote, nonelectrical, radiation-mapping device known as RadBall (patent pending), which offers a means to locate and quantify radiation hazards and sources within contaminated areas of the nuclear industry. Positive results from initial deployment trials in nuclear waste reprocessing plants at Sellafield in the United Kingdom and the anticipated future potential use of RadBall throughout the U.S. Department of Energy Complex have led to the NNL partnering with the Savannah River National Laboratory (SRNL) to further test, underpin, and strengthen the technical performance of the technology. The study completed at SRNL addresses key aspects of the testing of the RadBall technology. The first set of tests was performed at Savannah River Nuclear Solutions Health Physics Instrument Calibration Laboratory (HPICL) using various gamma-ray sources and an x-ray machine with known radiological characteristics. The objective of these preliminary tests was to identify the optimal dose and collimator thickness. The second set of tests involved a highly contaminated hot cell. The objective of this testing was to characterize a hot cell with unknown radiation sources. The RadBall calibration experiments and hot cell deployment were successful in that for each trial radiation tracks were visible. The deployment of RadBall can be accomplished in different ways depending on the size and characteristics of the contaminated area (e.g., a hot cell that already has a crane/manipulator available or highly contaminated room that requires the use of a remote control device with sensor and video equipment to position RadBall). This report also presents SRNL-designed RadBall accessories for future RadBall deployment (a harness, PODS, and robot).

  20. Radiological impact of 1996 operations at the Savannah River Site

    SciTech Connect

    Jannik, G.T.

    1997-08-01

    During 1996, atmospheric releases of tritium from the Savannah River Site (SRS) were dramatically less than in 1995. The total amount of atmospheric tritium released during 1996 was 55,300 curies, which was 43% less than the total of 96,700 curies. Of the total tritium released, 40,100 curies were tritium oxide, this was 27% less than the 1995 atmospheric tritium oxide release total of 55,000 curies. Releases of radioactive liquid effluents from SRS decreased during 1996. Liquid releases of tritium (which constitutes more than 99% of the total radioactivity released to the Savannah River) in 1996 (8,950 curies) were about 21% less than during 1995 (11,400 curies). In 1996, the potential dose to the maximally exposed individual from SRS atmospheric releases was estimated to be 0.05 mrem, 0.5% of the US Environmental Protection Agency (EPA) and US Department of Energy (DOE) air pathway dose standard of 10 mrem/year. The 80-kilometer-radius population of 620,100 people potentially received a collective dose of 2.8 person-rem from SRS atmospheric radioactive releases. The 1996 collective dose was about 20% lower than the 1995 collective dose of 3.5 person-rem. The potential dose to the maximally exposed individual from 1996 SRS liquid radioactive releases was estimated to be 0.14 mrem, 0.14% of the DOE all-pathway dose standard of 100 mrem/year. The collective dose from SRS liquid releases during 1996 was estimated at 2.2 person-rem. The major exposure pathway to the population was drinking water, with tritium accounting for more than 70% of the total collective dose.

  1. Radiological impact of 1992 operations at the Savannah River Site

    SciTech Connect

    Hamby, D.M.

    1993-12-01

    The offsite individual residing at the SRS boundary location of maximum exposure (maximum individual) received a dose from SRS atmospheric releases in 1992 of 0.10 mrem. Tritium oxide releases were responsible for more than 90% of the atmospheric dose. Ninety-nine percent of the atmospheric dose is accounted for with the inclusion of I-129, U-235, Pu-238 and Pu-239. The 50-mile population received a collective dose of 6.4 person-rem from 1992 releases. Atmospheric radiation dose is dominated by the inhalation and vegetation consumption pathways. The maximum dose received by an offsite individual as a result of SRS liquid releases in 1992 was 0.13 mrem. This dose is dominated by Cs-137 that is accumulated in Savannah River fish and tritium in drinking water. More than 99% of the maximum individual dose from liquid releases results from Cs-137, tritium, Sr-90, and Pu-239. The population dose from liquid releases in 1992 was 2.5 person-rem. The major exposure pathway to the population is drinking water. Radiation dose to the general public from operations at the Savannah River Site continues to be a very small fraction of the natural background dose. A resident of the CSRA receives about 300 mrem per year from background radiation. The population within 50-miles of the SRS (620,000) and at the downstream water treatment facilities (65,000), therefore, receives a natural background population dose of approximately 200,000 person-rem.

  2. Examples of Savannah River water dilution between the Savannah River Plant and the Beaufort-Jasper and Port Wentworth water-treatment plants

    SciTech Connect

    Hayes, D.W.

    1983-01-12

    A substantial dilution of the river water occurs between the Savannah River Plant (SRP) and the two treatment plants. This dilution results from inflow of surface and groundwater and from direct rainfall. The amount of dilution was estimated to be approximately 20% and 54% down to the Port Wentworth and Beaufort-Jasper plants, respectively.

  3. Ecology and management of a forested landscape: fifty years on the Savannah River Site.

    SciTech Connect

    Kilgo, John, C.; Blake, John, I.

    2005-07-01

    Kilgo, John, C., and John I. Blake. 2005. Ecology and management of a forested landscape; fifty years on the Savannah River Site. Island Press. Washington, DC. John C. Kilgo and John I. Blake, eds. 479 pp. Abstract: This book chronicles and catalogs the forest management and forest restoration practices over the last 50 years at the Savannah River Site. It includes a description of the land use history, physical environment, forest management, biotic communities, threatened and endangered species and harvestable natural resources of the area known today as the Savannah River Site, South Carolina.

  4. Review of Savannah River Site K Reactor inservice inspection and testing restart program

    SciTech Connect

    Anderson, M.T.; Hartley, R.S.; Kido, C.

    1992-09-01

    Inservice inspection (ISI) and inservice testing (IST) programs are used at commercial nuclear power plants to monitor the pressure boundary integrity and operability of components in important safety-related systems. The Department of Energy (DOE) - Office of Defense Programs (DP) operates a Category A (> 20 MW thermal) production reactor at the Savannah River Site (SRS). This report represents an evaluation of the ISI and IST practices proposed for restart of SRS K Reactor as compared, where applicable, to current ISI/IST activities of commercial nuclear power facilities.

  5. Influences on Mercury Bioaccumulation Factors for the Savannah River

    SciTech Connect

    Paller, M.H.

    2003-05-06

    Mercury TMDLs (Total Maximum Daily Loads) are a regulatory instrument designed to reduce the amount of mercury entering a water body and ultimately to control the bioaccumulation of mercury in fish. TMDLs are based on a BAF (bioaccumulation factor), which is the ratio of methyl mercury in fish to dissolved methyl mercury in water. Analysis of fish tissue and aqueous methyl mercury samples collected at a number of locations and over several seasons in a 118 km reach of the Savannah River demonstrated that species specific BAFs varied by factors of three to eight. Factors contributing to BAF variability were location, habitat and season related differences in fish muscle tissue mercury levels and seasonal differences in dissolved methyl mercury levels. Overall (all locations, habitats, and seasons) average BAFs were 3.7 x 106 for largemouth bass, 1.4 x 106 for sunfishes, and 2.5 x 106 for white catfish. Inaccurate and imprecise BAFs can result in unnecessary economic impact or insufficient protection of human health. Determination of representative and precise BAFs for mercury in fish from large rivers necessitates collecting large and approximately equal numbers of fish and aqueous methyl mercury samples over a seasonal cycle from the entire area and all habitats to be represented by the TMDL.

  6. Environmental contaminant concentrations in biota from the lower Savannah River, Georgia and South Carolina

    USGS Publications Warehouse

    Winger, P.V.; Schultz, D.P.; Johnson, W.W.

    1990-01-01

    Planned harbor expansion and industrial developments may adversely affect the economically important aquatic resources of the lower Savannah River, including those at the Savannah National Wildlife Refuge. To establish the present level of chemical contamination in this system, we collected a total of 102 samples of nine species of fish and fiddler crabs (Uca pugilator) from eleven sites in the lower Savannah River and on the Savannah National Wildlife Refuge, and analyzed them for concentrations of organochlorine chemicals, aliphatic and aromatic petroleum hydrocarbons, and 13 elemental contaminants: aluminum, arsenic, cadmium, chromium, cobalt, copper, iron, lead, manganese, mercury, nickel, selenium, and zinc. Residues of DDT (mainly as DDE),trans-nonachlor, dieldrin, Aroclor? 1260, mirex, and petroleum hydrocarbons were common in fish from the lower Savannah River, but concentrations were below those warranting environmental concern. In general, the concentrations of elemental contaminants also were low; however, arsenic, cadmium, and chromium concentrations were elevated in fish from river stations near the city of Savannah, and lead was elevated in samples from the National Wildlife Refuge. Contamination of the lower Savannah River by organic and elemental contaminants, as indicated by concentrations in fishes and fiddler crabs, did not appear to pose a hazard.

  7. Integrated Project Management Planning for the Deactivation of the Savannah River Site F-Canyon Complex

    SciTech Connect

    Clark, T.G.

    2000-12-01

    This paper explains the planning process that is being utilized by the Westinghouse Savannah River Company to take the F-Canyon Complex facilities from operations to a deactivated condition awaiting final decommissioning.

  8. The Regional Water Table of the Savannah River Site and Related Coverages

    SciTech Connect

    Hiergesell, R.A.

    1999-01-05

    A new regional-scale map of the water table configuration beneath the Savannah River Site and its surrounding area has been developed. This map is regarded as a more accurate representation of this surface than all previous maps.

  9. Demonstration of Small Tank Tetraphenylborate Precipitation Process Using Savannah River Site High Level Waste

    SciTech Connect

    Peters, T.B.

    2001-09-10

    This report details the experimental effort to demonstrate the continuous precipitation of cesium from Savannah River Site High Level Waste using sodium tetraphenylborate. In addition, the experiments examined the removal of strontium and various actinides through addition of monosodium titanate.

  10. Savannah River Site Experiences in In Situ Field Measurements of Radioactive Materials

    SciTech Connect

    Moore, F.S.

    1999-10-07

    This paper discusses some of the field gamma-ray measurements made at the Savannah River Site, the equipment used for the measurements, and lessons learned during in situ identification and characterization of radioactive materials.

  11. Characterizing the Environmental Availability of Trace Metals in Savannah River Site Soils

    SciTech Connect

    Serkiz, S.M.

    1999-03-18

    An eight step sequential extraction technique was used to characterize the environmental availability of trace metals from background and waste site soil samples collected from the US Department of Energy's Savannah River Site (SRS).

  12. Data Summary Report for Savannah River Integrator Operable Unit Fish Tissue

    SciTech Connect

    Craig, B.

    2001-02-13

    This report presents the results of the verification and validation of the analytical data for the Savannah River Fish (SRF) investigation. The data were validated to determine if the records conform to the technical criteria associated with definitive data.

  13. Evaluation of Cone Penetrometer Data for Permeability Correlation at the Savannah River Site

    SciTech Connect

    Harris, M.K.

    1997-02-01

    This report documents the results of an assessment of cone penetrometer technology (CPT) use at the Savannah River Site. The study is intended to provide valuable insight into methods of increasing the utility of CPT data for site characterization.

  14. Intensive archaeological survey of the proposed Savannah River Ecology Laboratory Conference Center and Educational Facility, Savannah River Site, Aiken County, South Carolina

    SciTech Connect

    Stephenson, K.; Crass, D.C.; Sassaman, K.E.

    1993-02-01

    Documented in this report are the methods and results of an intensive archaeological survey for the proposed University of Georgia Savannah River Ecology Laboratory (SREL) Conference Center and Educational Facility on the DOE Savannah River Site (SRS). Archaeological investigations conducted by the Savannah River Archaeological Research Program (SRARP) on the 70-acre project area and associated rights-of-way consisted of subsurface testing at two previously recorded sites and the discovery of one previously unrecorded site. The results show that 2 sites contain archaeological remains that may yield significant information about human occupations in the Aiken Plateau and are therefore considered eligible for nomination to the National Register of Historic Places. Adverse impacts to these sites can be mitigated through avoidance.

  15. DEVELOPMENT AND DEPLOYMENT OF VACUUM SALT DISTILLATION AT THE SAVANNAH RIVER SITE

    SciTech Connect

    Pierce, R.; Pak, D.; Edwards, T.

    2010-10-28

    The Savannah River Site has a mission to dissolve fissile materials and disposition them. The primary fissile material is plutonium dioxide (PuO{sub 2}). To support dissolution of these materials, the Savannah River National Laboratory (SRNL) designed and demonstrated a vacuum salt distillation (VSD) apparatus using both representative radioactive samples and non-radioactive simulant materials. Vacuum salt distillation, through the removal of chloride salts, increases the quantity of materials suitable for processing in the site's HB-Line Facility. Small-scale non-radioactive experiments at 900-950 C show that >99.8 wt % of the initial charge of chloride salt distilled from the sample boat with recovery of >99.8 wt % of the ceric oxide (CeO{sub 2}) - the surrogate for PuO{sub 2} - as a non-chloride bearing 'product'. Small-scale radioactive testing in a glovebox demonstrated the removal of sodium chloride (NaCl) and potassium chloride (KCl) from 13 PuO{sub 2} samples. Chloride concentrations were distilled from a starting concentration of 1.8-10.8 wt % to a final concentration <500 mg/kg chloride. Initial testing of a non-radioactive, full-scale production prototype is complete. A designed experiment evaluated the impact of distillation temperature, time at temperature, vacuum, product depth, and presence of a boat cover. Significant effort has been devoted to mechanical considerations to facilitate simplified operation in a glovebox.

  16. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    SciTech Connect

    Scott, D.E.; Pechmann, J.H.K.; Knox, J.N.; Estes, R.A.; McGregor, J.H.; Bailey, K.

    1988-12-01

    The Savannah River Ecology Laboratory has completed 10 years of ecological studies related to the construction of the Defense Waste Processing Facility (DWPF) on the Savannah River Site. This progress report examines water quality studies on streams peripheral to the DWPF construction site and examines the effectiveness of refuge ponds'' in ameliorating the effects of construction on local amphibians. Individual papers on these topics are indexed separately. 93 refs., 15 figs., 15 tabs. (MHB)

  17. Robotics and Automation Activities at the Savannah River Site: A Site Report for SUBWOG 39F

    SciTech Connect

    Teese, G.D.

    1995-09-28

    The Savannah River Site has successfully used robots, teleoperators, and remote video to reduce exposure to ionizing radiation, improve worker safety, and improve the quality of operations. Previous reports have described the use of mobile teleoperators in coping with a high level liquid waste spill, the removal of highly contaminated equipment, and the inspection of nuclear reactor vessels. This report will cover recent applications at the Savannah River, as well as systems which SRS has delivered to other DOE site customers.

  18. Instream biological assessment of NPDES point source discharges at the Savannah River Site, 1997-1998

    SciTech Connect

    Specht, W.L.

    2000-02-28

    The Savannah River Site currently has 33 permitted NPDES outfalls that have been permitted by the South Carolina Department of Health an Environmental Control to discharge to SRS streams and the Savannah River. In order to determine the cumulative impacts of these discharges to the receiving streams, a study plan was developed to perform in-stream assessments of the fish assemblages, macroinvertebrate assemblages, and habitats of the receiving streams.

  19. Waterborne Release Monitoring and Surveillance Programs at the Savannah River Site

    SciTech Connect

    Blanchard, A.

    1999-03-26

    This report documents the liquid release environmental compliance programs currently in place at the Savannah river Site (SRS). Included are descriptions of stream monitoring programs, which measure chemical parameters and radionuclides in site streams and the Savannah river and test representative biological communities within the streams for chemical and radiological uptake. This report also explains the field sampling and analytical capabilities that are available at SRS during both normal and emergency conditions.

  20. Independent Assessment of the Savannah River Site High-Level Waste Salt Disposition Alternatives Evaluation

    SciTech Connect

    J. T. Case; M. L. Renfro

    1998-12-01

    This report presents the results of the Independent Project Evaluation (IPE) Team assessment of the Westinghouse Savannah River Company High-Level Waste Salt Disposition Systems Engineering (SE) Team's deliberations, evaluations, and selections. The Westinghouse Savannah River Company concluded in early 1998 that production goals and safety requirements for processing SRS HLW salt to remove Cs-137 could not be met in the existing In-Tank Precipitation Facility as currently configured for precipitation of cesium tetraphenylborate. The SE Team was chartered to evaluate and recommend an alternative(s) for processing the existing HLW salt to remove Cs-137. To replace the In-Tank Precipitation process, the Savannah River Site HLW Salt Disposition SE Team downselected (October 1998) 140 candidate separation technologies to two alternatives: Small-Tank Tetraphenylborate (TPB) Precipitation (primary alternative) and Crystalline Silicotitanate (CST) Nonelutable Ion Exchange (backup alternative). The IPE Team, commissioned by the Department of Energy, concurs that both alternatives are technically feasible and should meet all salt disposition requirements. But the IPE Team judges that the SE Team's qualitative criteria and judgments used in their downselection to a primary and a backup alternative do not clearly discriminate between the two alternatives. To properly choose between Small-Tank TPB and CST Ion Exchange for the primary alternative, the IPE Team suggests the following path forward: Complete all essential R and D activities for both alternatives and formulate an appropriate set of quantitative decision criteria that will be rigorously applied at the end of the R and D activities. Concurrent conceptual design activities should be limited to common elements of the alternatives.

  1. Intermediate-Scale Ion Exchange Removal of Technetium from Savannah River Site Tank 44 F Supernate Solution

    SciTech Connect

    King, W.D.

    2000-08-23

    As part of the Hanford River Protection Project waste Treatment facility design contracted to BNFL, Inc., a sample of Savannah River Site (SRS) Tank 4 F waste solution was treated for the removal of technetium (as pertechnetate ion). Interest in treating the SRS sample for Tc removal resulted from the similarity between the Tank 44 F supernate composition and Hanford Envelope A supernate solutions. The Tank 44 F sample was available as a by-product of tests already conducted at the Savannah River Technology Center (SRTC) as part of the Alternative Salt Disposition Program for treatment of SRS wastes. Testing of the SRS sample resulted in considerable cost-savings since it was not necessary to ship a sample of Hanford supernate to SRS.

  2. Radioactive effluents in Savannah River. Summary Report for 1995

    SciTech Connect

    Winn, W.G.

    1996-06-27

    During 1995, the radioactive effluents in the Savannah River were generally lower but comparable to those observed during the earlier years of these studies, being orders of magnitude below DOE and EPA/CFR guide levels. Vogtle has only one notable effluent release in 1995. In earlier year, Vogtle effluents had been dominated by {sub 58}Co; however, in 1995 {sub 60}Co exhibited the overall maximum at 1.31 pCi/L, which is almost three times larger than the previous {sub 60}Co maximum of 0.49 pCi/L observed in 1988. By comparison, the {sub 58}Co maximum was 0.46 pCi/L, which was lower than its maxima in earlier years. In addition to {sub 58}Co and {sub 60}Co, Vogtle activities of {sub 54}Mn, {sub 57}Co, {sub 95}Nb, and {sub 95}Zr were observed. The above activities were observed from samples just downstream of Vogtle, but these samples were discontinued in October due to funding priorities. In addition, {sub 137}Cs was detected, but its levels are consistent with known SRS sources. The maximum for {sub 137}Cs was 49 fCi/L at Highway 301 Bridge.

  3. Continuous tritium effluent water monitor at the Savannah River Site

    SciTech Connect

    Hofstetter, K.J.; Wilson, H.T.

    1992-01-01

    A continuous monitor for tritium in water has been installed in the secondary cooling water effluent from the K-Reactor at the Savannah River Site (SRS). The monitor is designed to provide early detection of a small leak of the tritiated heavy water moderator and facilitate rapid isolation procedures. The tritium detector consists of an analysis cell containing 0.1--0.25 mm diameter beads of plastic scintillator interposed between two photomultiplier tubes and standard fast-slow coincidence electronics. A small portion of the effluent stream is first filtered through a series of cartridge filters (0.2 [mu]m final filter) and then chemically treated by ion exchange resin and activated charcoal before reaching the cell. Flow through the detector is [approx]3 mL/min. The tritium effluent water monitor (TEWM) will alarm if the tritium in the outfall exceeds 56 Bq/mL during a 10 minute counting interval. The installation and performance of the TEWM are discussed.

  4. Continuous tritium effluent water monitor at the Savannah River Site

    SciTech Connect

    Hofstetter, K.J.; Wilson, H.T.

    1992-11-01

    A continuous monitor for tritium in water has been installed in the secondary cooling water effluent from the K-Reactor at the Savannah River Site (SRS). The monitor is designed to provide early detection of a small leak of the tritiated heavy water moderator and facilitate rapid isolation procedures. The tritium detector consists of an analysis cell containing 0.1--0.25 mm diameter beads of plastic scintillator interposed between two photomultiplier tubes and standard fast-slow coincidence electronics. A small portion of the effluent stream is first filtered through a series of cartridge filters (0.2 {mu}m final filter) and then chemically treated by ion exchange resin and activated charcoal before reaching the cell. Flow through the detector is {approx}3 mL/min. The tritium effluent water monitor (TEWM) will alarm if the tritium in the outfall exceeds 56 Bq/mL during a 10 minute counting interval. The installation and performance of the TEWM are discussed.

  5. Reliability evaluation of the Savannah River reactor leak detection system

    SciTech Connect

    Daugherty, W.L.; Sindelar, R.L. ); Wallace, I.T. )

    1991-01-01

    The Savannah River Reactors have been in operation since the mid-1950's. The primary degradation mode for the primary coolant loop piping is intergranular stress corrosion cracking. The leak-before-break (LBB) capability of the primary system piping has been demonstrated as part of an overall structural integrity evaluation. One element of the LBB analyses is a reliability evaluation of the leak detection system. The most sensitive element of the leak detection system is the airborne tritium monitors. The presence of small amounts of tritium in the heavy water coolant provide the basis for a very sensitive system of leak detection. The reliability of the tritium monitors to properly identify a crack leaking at a rate of either 50 or 300 lb/day (0.004 or 0.023 gpm, respectively) has been characterized. These leak rates correspond to action points for which specific operator actions are required. High reliability has been demonstrated using standard fault tree techniques. The probability of not detecting a leak within an assumed mission time of 24 hours is estimated to be approximately 5 {times} 10{sup {minus}5} per demand. This result is obtained for both leak rates considered. The methodology and assumptions used to obtain this result are described in this paper. 3 refs., 1 fig., 1 tab.

  6. Savannah River Site reactor hardware design modification study

    SciTech Connect

    Fisher, J.E.

    1990-01-01

    A study was undertaken to assess the merits of proposed design modifications to the Savannah River Site (SRS) reactors. The evaluation was based on the responses calculated by the RELAP5 systems code to double-ended guillotine break loss-of-coolant-accidents (DEGB LOCAs). The three concepts evaluated were (a) elevated plenum inlet piping with a guard vessel and clamshell enclosures, (b) closure of both rotovalves in the affected loop, and (c) closure of the pump suction valve in the affected loop. Each concept included a fast reactor shutdown (to 65% power in 100 ms) and a 2-s ac pump trip. System recovery potential was evaluated for break locations at the pump suction, the pump discharge, and the plenum inlet. The code version used was RELAP5/MOD2.5 version 3d3, a preliminary version of RELAP5/MOD3. The model was a three-dimensional representation of the K-Reactor water plenum and moderator tank. It included explicit representations of all six loops, which were based on the configuration of L-Reactor. A combination of features is recommended to ensure liquid inventory recovery for all break locations. Valve closure design performance for a break location in the short section of piping between the reactor concrete shield and the pump suction valve would benefit from the clamshell enclosing that section of piping. 7 refs., 10 figs., 2 tabs.

  7. MOX Lead Assembly Fabrication at the Savannah River Site

    SciTech Connect

    Geddes, R.L.; Spiker, D.L.; Poon, A.P.

    1997-12-01

    The U. S. Department of Energy (DOE) announced its intent to prepare an Environmental Impact Statement (EIS) under the National Environmental Policy Act (NEPA) on the disposition of the nations weapon-usable surplus plutonium.This EIS is tiered from the Storage and Disposition of Weapons-Usable Fissile Material Programmatic Environmental Impact Statement issued in December 1996,and the associated Record of Decision issued on January, 1997. The EIS will examine reasonable alternatives and potential environmental impacts for the proposed siting, construction, and operation of three types of facilities for plutonium disposition. The three types of facilities are: a pit disassembly and conversion facility, a facility to immobilize surplus plutonium in a glass or ceramic form for disposition, and a facility to fabricate plutonium oxide into mixed oxide (MOX) fuel.As an integral part of the surplus plutonium program, Oak Ridge National Laboratory (ORNL) was tasked by the DOE Office of Fissile Material Disposition(MD) as the technical lead to organize and evaluate existing facilities in the DOE complex which may meet MD`s need for a domestic MOX fuel fabrication demonstration facility. The Lead Assembly (LA) facility is to produce 1 MT of usable test fuel per year for three years. The Savannah River Site (SRS) as the only operating plutonium processing site in the DOE complex, proposes two options to carry out the fabrication of MOX fuel lead test assemblies: an all Category I facility option and a combined Category I and non-Category I facilities option.

  8. A climatological description of the Savannah River Site

    SciTech Connect

    Hunter, C.H.

    1990-05-22

    This report provides a general climatological description of the Savannah River Site. The description provides both regional and local scale climatology. The regional climatology includes a general regional climatic description and presents information on occurrence frequencies of the severe meteorological phenomena that are important considerations in the design and siting of a facility. These phenomena include tornadoes, thunderstorms, hurricanes, and ice/snow storms. Occurrence probabilities given for extreme tornado and non-tornado winds are based on previous site specific studies. Local climatological conditions that are significant with respect to the impact of facility operations on the environment are described using on-site or near-site meteorological data. Summaries of wind speed, wind direction, and atmospheric stability are primarily based on the most recently generated five-year set of data collected from the onsite meteorological tower network (1982--86). Temperature, humidity, and precipitation summaries include data from SRL's standard meteorological instrument shelter and the Augusta National Weather Service office at Bush Field through 1986. A brief description of the onsite meteorological monitoring program is also provided. 24 refs., 15 figs., 22 tabs.

  9. Characterization recommendations for waste sites at the Savannah River Plant

    SciTech Connect

    Carlton, W.H.; Gordon, D.E.; Johnson, W.F.; Kaback, D.S.; Looney, B.B.; Nichols, R.L.; Shedrow, C.B.

    1987-11-01

    One hundred and sixty six disposal facilities that received or may have received waste materials resulting from operations at the Savannah River Plant (SRP) have been identified. These waste range from innocuous solid and liquid materials (e.g., wood piles) to process effluents that contain hazardous and/or radioactive constituents. The waste sites have been grouped into 45 categories according the the type of waste materials they received. Waste sites are located with SRP coordinates, a local Department of Energy (DOE) grid system whose grid north is 36 degrees 22 minutes west of true north. DOE policy is to close all waste sites at SRP in a manner consistent with protecting human health and environment and complying with applicable environmental regulations (DOE 1984). A uniform, explicit characterization program for SRP waste sites will provide a sound technical basis for developing closure plans. Several elements are summarized in the following individual sections including (1) a review of the history, geohydrology, and available characterization data for each waste site and (2) recommendations for additional characterization necessary to prepare a reasonable closure plan. Many waste sites have been fully characterized, while others have not been investigated at all. The approach used in this report is to evaluate available groundwater quality and site history data. For example, groundwater data are compared to review criteria to help determine what additional information is required. The review criteria are based on regulatory and DOE guidelines for acceptable concentrations of constituents in groundwater and soil.

  10. Management of groundwater corrective actions at the Savannah River Site

    SciTech Connect

    Amidon, M.B.; Ebra, M.A.; Horvath, J.G.; Lewis, C.M.; Bergren, C.L.

    1992-01-01

    The Savannah River Site, SRS, has experienced groundwater contamination as a result of past operating practices. Clean-up of these groundwaters has the potential to become a very large effort requiring a significant commitment of resources. However, the contaminated groundwaters identified do not present an imminent risk to the offsite population or to onsite workers. In order to ensure a risk-based, cost-effective approach to these actions, a program plan has been developed for the management of contaminated groundwaters at the SRS. This paper will describe the strategy for contaminated groundwater management resulting from the SRS groundwater program plan. Initial corrective actions at SRS have been driven by regulatory requirements under the Resource Conservation and Recovery Act, RCRA. A major groundwater corrective action has been conducted at one waste site at the SRS since 1985. Other potentially major corrective actions at the SRS have been identified. The contaminants of concern include organic solvents, radionuclides, and heavy metals, and their removal presents significant technical challenges. The strategy proposes to: evaluate the regulatory requirements, the long-term risks of the various contaminated groundwater units, the technical requirements associated with clean-up, and the availability of resources; and prioritize future corrective actions while meeting existing commitments to action.

  11. Management of groundwater corrective actions at the Savannah River Site

    SciTech Connect

    Amidon, M.B.; Ebra, M.A.; Horvath, J.G.; Lewis, C.M.; Bergren, C.L.

    1992-06-01

    The Savannah River Site, SRS, has experienced groundwater contamination as a result of past operating practices. Clean-up of these groundwaters has the potential to become a very large effort requiring a significant commitment of resources. However, the contaminated groundwaters identified do not present an imminent risk to the offsite population or to onsite workers. In order to ensure a risk-based, cost-effective approach to these actions, a program plan has been developed for the management of contaminated groundwaters at the SRS. This paper will describe the strategy for contaminated groundwater management resulting from the SRS groundwater program plan. Initial corrective actions at SRS have been driven by regulatory requirements under the Resource Conservation and Recovery Act, RCRA. A major groundwater corrective action has been conducted at one waste site at the SRS since 1985. Other potentially major corrective actions at the SRS have been identified. The contaminants of concern include organic solvents, radionuclides, and heavy metals, and their removal presents significant technical challenges. The strategy proposes to: evaluate the regulatory requirements, the long-term risks of the various contaminated groundwater units, the technical requirements associated with clean-up, and the availability of resources; and prioritize future corrective actions while meeting existing commitments to action.

  12. The Savannah River Plant's Groundwater Monitoring Program, fourth quarter 1987

    SciTech Connect

    Not Available

    1987-01-01

    The Savannah River Plant's Groundwater Monitoring Program is administered by the Environmental Monitoring Group of the Health Protection Department. During the fourth quarter of 1987 (October--December), routine monitoring was performed on monitoring wells and drinking water locations. This quarterly report includes the radioactive monitoring data from drinking water. These data were collected from SRP drinking water systems supplied by wells. Two sets of flagging criteria were established in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels but are intended to aid personnel in sample scheduling, interpretation of data, and trend identification. The first-level flagging criteria are based on detection limits or background levels in SRP groundwater. The second-level flagging criteria are based on various water standards or levels significantly above background. During the fourth quarter of 1987, Priority Pollutant analyses were conducted on LFW wells and Appendix IX analyses were conducted on FSB point-of-compliance wells. Also during this quarter, one drinking water sample exceeded the first-level flagging criteria.

  13. Vegetation of the Savannah River Site: Major community types

    SciTech Connect

    Workman, S.W.; McLeod, K.W.

    1990-01-01

    The eight major plant community types of the Savannah River Site (SRS) are distributed along topographic and moisture gradients and strongly controlled by local management practices. Communities range from sandhill communities in the xeric uplands to bottomland or swamp forests in low-lying areas subject to periodic flooding. The variety of community types and extensive land area (78,000 ha) of the SRS provides habitat for a diversity of plant species. As a National Environmental Research Park, the SRS provides an area for study of man-altered systems in relation to natural systems. A site-wide Set-Aside Areas program designates specific parcels of land representing different community types on the SRS. These areas conserve habitat for plants and wildlife, including some endangered, threatened and rare species. This document provides descriptions, including community characteristics and species composition, for the eight major vegetation communities of the SRS (old field, sandhill, upland hardwood, pinelands, bottomland, swamp, Carolina bay and fresh water). Species lists of tree, shrub, vine, herbaceous, and lower plant species of the SRS, by community type, were compiled from existing literature, herbarium information, and solicited additions from researchers familiar with SRS vegetation; these are provided in appendices. 130 refs., 19 figs.

  14. Neptunium Disposal to the Savannah River Site Tank Farm

    SciTech Connect

    Walker, D.D.

    2004-02-26

    Researchers investigated the neutralization of an acidic neptunium solution from a Savannah River Site (SRS) processing canyon and the properties of the resulting slurry to determine the feasibility of disposal in the SRS tank farm. The acidic solution displayed no properties that precluded the proposed disposal route. Neutralization of the acidic neptunium forms a 4 wt per cent slurry of precipitated metal hydroxides. The insoluble solids consist largely of iron (92 per cent) and neptunium hydroxides (2 per cent). The concentration of soluble neptunium remaining after neutralization equaled much less than previous solubility measurements predicted. Researchers used an apparatus similar to an Ostwald-type viscometer to estimate the consistency of the neptunium slurry with the solids present. The yield stress and consistency of the 4 wt per cent slurry will allow transfer through the tank farm, although concentration of the insoluble solids above 4 wt per cent may cause significant problems due to increased consistency and yield stress. The consistency of the 4 wt per cent slurry is 7.6 centipoise (cP) with a yield stress less than 1 Pascal (Pa). The neptunium slurry, when combined with actual washed radioactive sludge, slightly reduces the yield stress and consistency of the sludge and produces a combined slurry with acceptable rheological properties for vitrification.

  15. Axial power monitoring uncertainty in the Savannah River Reactors

    SciTech Connect

    Losey, D.C.; Revolinski, S.M.

    1990-01-01

    The results of this analysis quantified the uncertainty associated with monitoring the Axial Power Shape (APS) in the Savannah River Reactors. Thermocouples at each assembly flow exit map the radial power distribution and are the primary means of monitoring power in these reactors. The remaining uncertainty in power monitoring is associated with the relative axial power distribution. The APS is monitored by seven sensors that respond to power on each of nine vertical Axial Power Monitor (APM) rods. Computation of the APS uncertainty, for the reactor power limits analysis, started with a large database of APM rod measurements spanning several years of reactor operation. A computer algorithm was used to randomly select a sample of APSs which were input to a code. This code modeled the thermal-hydraulic performance of a single fuel assembly during a design basis Loss-of Coolant Accident. The assembly power limit at Onset of Significant Voiding was computed for each APS. The output was a distribution of expected assembly power limits that was adjusted to account for the biases caused by instrumentation error and by measuring 7 points rather than a continuous APS. Statistical analysis of the final assembly power limit distribution showed that reducing reactor power by approximately 3% was sufficient to account for APS variation. This data confirmed expectations that the assembly exit thermocouples provide all information needed for monitoring core power. The computational analysis results also quantified the contribution to power limits of the various uncertainties such as instrumentation error.

  16. Axial power monitoring uncertainty in the Savannah River Reactors

    SciTech Connect

    Losey, D.C.; Revolinski, S.M.

    1990-12-31

    The results of this analysis quantified the uncertainty associated with monitoring the Axial Power Shape (APS) in the Savannah River Reactors. Thermocouples at each assembly flow exit map the radial power distribution and are the primary means of monitoring power in these reactors. The remaining uncertainty in power monitoring is associated with the relative axial power distribution. The APS is monitored by seven sensors that respond to power on each of nine vertical Axial Power Monitor (APM) rods. Computation of the APS uncertainty, for the reactor power limits analysis, started with a large database of APM rod measurements spanning several years of reactor operation. A computer algorithm was used to randomly select a sample of APSs which were input to a code. This code modeled the thermal-hydraulic performance of a single fuel assembly during a design basis Loss-of Coolant Accident. The assembly power limit at Onset of Significant Voiding was computed for each APS. The output was a distribution of expected assembly power limits that was adjusted to account for the biases caused by instrumentation error and by measuring 7 points rather than a continuous APS. Statistical analysis of the final assembly power limit distribution showed that reducing reactor power by approximately 3% was sufficient to account for APS variation. This data confirmed expectations that the assembly exit thermocouples provide all information needed for monitoring core power. The computational analysis results also quantified the contribution to power limits of the various uncertainties such as instrumentation error.

  17. Vegetation change detection in the Savannah River swamp

    SciTech Connect

    Jensen, J.R.; Christensen, E.J.; Mackey, H.E. Jr.

    1986-01-01

    Portions of Pen Branch, Four Mile Creek, Steel Creek, and Beaver Dam Creek deltas in the Savannah River swamp were evaluated for wetlands vegetation change using aircraft multispectral scanner (MSS) data acquired at 2440 meters altitude. Areas of 190 hectares on the Pen Branch, Four Mile Creek, and Beaver Dam Creek deltas, and a 240-hectare portion of Steel Creek delta were registered, classified, and wetlands vegetation change detection categories determined. Pen Branch and Four Mile Creek deltas each lost about 12 hectares of swamp forest from 1981 to 1984. Secondary successional forest regrew on portions of the Four Mile Creek delta (2.4 hectares) and the Beaver Dam Creek delta (15.4 hectares). About 5 hectares of swamp forest regrew on the Steel Creek delta. This may be the first study to detect wetlands vegetation change over several years using aircraft MSS data. One reason could be due to difficulties similar to those encountered in this study. Data distortion from aircraft movement in some areas of the swamp made image-to-image registration difficult. Best results were obtained on Beaver Dam Creek and Steel Creek deltas which had average registration accuracies within one data element, or pixel, of 5.6 x 5.6 meters. Phenological differences and shadows caused difficulties in vegetation-type discrimination and classification. As a result, the number of vegetation change classes were sometimes limited.

  18. Tritium in the Savannah River Site environment. Revision 1

    SciTech Connect

    Murphy, C.E. Jr.; Bauer, L.R.; Hayes, D.W.; Marter, W.L.; Zeigler, C.C.; Stephenson, D.E.; Hoel, D.D.; Hamby, D.M.

    1991-05-01

    Tritium is released to the environment from many of the operations at the Savannah River Site. The releases from each facility to the atmosphere and to the soil and streams, both from normal operations and inadvertent releases, over the period of operation from the early 1950s through 1988 are presented. The fate of the tritium released is evaluated through environmental monitoring, special studies, and modeling. It is concluded that approximately 91% of the tritium remaining after decay is now in the oceans. A dose and risk assessment to the population around the site is presented. It is concluded that about 0.6 fatal cancers may be associated with the tritium released during all the years of operation to the population of about 625,000. This same population (based on the overall US cancer statistics) is expected to experience about 105,000 cancer fatalities from all types of cancer. Therefore, it is considered unlikely that a relationship between any of the cancer deaths occurring in this population and releases of tritium from the SRS will be found.

  19. Meteorological annual report for 1995 at the Savannah River Site

    SciTech Connect

    Hunter, C.H.; Tatum, C.P.

    1996-12-01

    The Environmental Technology Section (ETS) of the Savannah River Technology Center (SRTC) collects, archives, and analyzes basic meteorological data supporting a variety of activities at SRS. These activities include the design, construction, and operation of nuclear and non-nuclear facilities, emergency response, environmental compliance, resource management, and environmental research. This report contains tabular and graphical summaries of data collected during 1995 for temperature, precipitation, relative humidity, wind, barometric pressure, and solar radiation. Most of these data were collected at the central Climatology Facility. Summaries of temperature and relative humidity were generated with data from the lowest level of measurement at the Central Climatology Site tower (13 feet above ground). (Relative humidity is calculated from measurements of dew-point temperature.) Wind speed summaries were generated with data from the second measurement level (58 feet above ground). Wind speed measurements from this level are believed to best represent open, well-exposed areas of the Site. Precipitation summaries were based on data from the Building 773-A site since quality control algorithms for the central Climatology Facility rain gauge data were not finalized at the time this report was prepared. This report also contains seasonal and annual summaries of joint occurrence frequencies for selected wind speed categories by 22.5 degree wind direction sector (i.e., wind roses). Wind rose summaries are provided for the 200-foot level of the Central Climatology tower and for each of the eight 200-foot area towers.

  20. Electronic Records Administration at the Savannah River Plant

    SciTech Connect

    Hudson, B.J.

    1987-01-01

    The Savannah River Plant (SRP), which is operated by DuPont for the Department of Energy (DOE), is faced with the problem of providing ready access to information. A sitewide information network has been installed implementing electronic mail (ALL-IN-1) and various other office automation features. However, users need access to information contained in manuals, earlier research reports, and technical publications located in the central files. Planning is underway to procure a document and information storage and retrieval system linked to the sitewide information network. The system should provide retrieval of image scans of any document via full text and keyword searching of current and archived documents. Old documents will be input to the system through a high-speed image scanning system and optical disk storage. Optical character recognition (OCR) will be performed on these images and the resulting text stored in a document search and retrieval system. A user will utilize the search system to identify the documents needed, and retrieve either the text only from the search system or the image scan from the optical storage system.

  1. Flood Hazard Assessment for the Savannah River Site

    SciTech Connect

    Chen, K.F.

    2000-08-15

    A method was developed to determine the probabilistic flood elevation curves for certain Savannah River Site (SRS) facilities. This paper presents the method used to determine the probabilistic flood elevation curve for F-Area due to runoff from the Upper Three Runs basin. Department of Energy (DOE) Order 420.1, Facility Safety, outlines the requirements for Natural Phenomena Hazard (NPH) mitigation for new and existing DOE facilities. The NPH considered in this paper is flooding. The facility-specific probabilistic flood hazard curve defines as a function of water elevation the annual probability of occurrence or the return period in years. Based on facility-specific probabilistic flood hazard curves and the nature of facility operations (e.g., involving hazardous or radioactive materials), facility managers can design permanent or temporary devices to prevent the propagation of flood on site, and develop emergency preparedness plans to mitigate the consequences of floods. A method was developed to determine the probabilistic flood hazard curves for SRS facilities. The flood hazard curves for the SRS F-Area due to flooding in the Upper Three Runs basin are presented in this paper.

  2. Flood hazard assessment for the Savannah River Site

    SciTech Connect

    Chen, K.F.

    2000-01-18

    A method was developed to determine the probabilistic flood elevation curves for certain Savannah River Site (SRS) facilities. This paper presents the method used to determine the probabilistic flood elevation curve for F-Area due to runoff from the Upper Three Runs basin. Department of Energy (DOE) Order 420.1, Facility Safety, outlines the requirements for Natural Phenomena Hazard (NPH) mitigation for new and existing DOE facilities. The NPH considered in this paper is flooding. The facility-specific probabilistic flood hazard curve defines as a function of water elevation the annual probability of occurrence or the return period in years. Based on facility-specific probabilistic flood hazard curves and the nature of facility operations (e.g., involving hazardous or radioactive materials), facility managers can design permanent or temporary devices to prevent the propagation of flood on site, and develop emergency preparedness plans to mitigate the consequences of floods. The flood hazard curves for the SRS F-Area due to flooding in the Upper Three Runs basin are presented in this paper.

  3. Savannah River Reactor Operation: Indices of risk for emergency planning

    SciTech Connect

    O'Kula, K.R.; East, J.M.

    1990-10-01

    Periodically it is necessary to re-examine the implications of new source terms for neighboring offsite populations as Probabilistic Risk Assessment (PRA) and Severe Accident studies mature, and lead to a better understanding of the progression of hypothetical core melt accidents in the Savannah River Site (SRS) reactors. In this application multiple-system failure, low-frequency events, and consequently higher radiological source terms than from normal operation or design basis accidents (DBAs) are considered. Measures of consequence such as constant dose vs distance, boundary doses, and health effects to close-in populations are usually examined in this context. A set of source terms developed for the Safety Information Document (SID) for support of the Reactor Operation Environmental Impact Statement (EIS) forms the basis for the revised risk evaluation discussed herein. The intent of this review is not to completely substantiate the sufficiency of the current Emergency Planning Zone (EPZ). However, the two principal measures (200-rem red-bone marrow dose vs distance and 300-rem thyroid dose vs distance) for setting an EPZ are considered. Additional dose-at-distance calculations and consideration of DBA doses would be needed to complete a re-evaluation of the current EPZ. These subject areas are not addressed in the current document. Also, this report evaluates the sensitivity of individual risk estimates to the extent of offsite evacuation assumed from a K reactor severe accident and compares these risks to the Draft DOE Safety Guidelines. 14 refs., 8 figs., 4 tabs.

  4. Remote reactor vessel inspections at Savannah River Plant

    SciTech Connect

    Lewis, W.I. III; Goodwin, B.W.; French, T.J.

    1988-01-01

    The Equipment Engineering Division of the Savannah River Laboratory has recently completed the development of a robotic inspection system for use in conducting full volumetric examinations of the site's reactor tanks. The development of the inspection equipment was necessary to obtain quantitative volumetric data on the structural integrity of the tanks such that service life could be evaluated. The development program included the design and fabrication of four, five-axis robotic inspection tools, six three-axis camera and lighting masts, video equipment, mobile control centers, complete mockup and testing facilities, and the integration of ultrasonic and eddy current data collection equipment. This paper gives a brief history of past reactor vessel inspections. The need, justification, and implementation of the development effort is then discussed. The various system components developed including the tools, controls, data acquisition systems, etc. are discussed along with the unique design constraints each had to meet and how each supports the overall inspection system. Implementation of the inspection system in the field and future development acres to increase the equipments versatility are also described. 2 refs., 9 figs.

  5. External events analysis for the Savannah River Site K reactor

    SciTech Connect

    Brandyberry, M.D.; Wingo, H.E.

    1990-01-01

    The probabilistic external events analysis performed for the Savannah River Site K-reactor PRA considered many different events which are generally perceived to be external'' to the reactor and its systems, such as fires, floods, seismic events, and transportation accidents (as well as many others). Events which have been shown to be significant contributors to risk include seismic events, tornados, a crane failure scenario, fires and dam failures. The total contribution to the core melt frequency from external initiators has been found to be 2.2 {times} 10{sup {minus}4} per year, from which seismic events are the major contributor (1.2 {times} 10{sup {minus}4} per year). Fire initiated events contribute 1.4 {times} 10{sup {minus}7} per year, tornados 5.8 {times} 10{sup {minus}7} per year, dam failures 1.5 {times} 10{sup {minus}6} per year and the crane failure scenario less than 10{sup {minus}4} per year to the core melt frequency. 8 refs., 3 figs., 5 tabs.

  6. Treatment and disposal of a mixed F006 plating line sludge at the Savannah River Site

    SciTech Connect

    Pickett, J.B.; Musall, J.C.; Martin, H.L.

    1993-05-01

    The Westinghouse Savannah River Company (WSRC), as the operating contractor for the Department of Energy (DOE) at the Savannah River Site (SRS) is implementing a program to treat and stabilize approximately 750,000 gallons of an F006 mixed (radioactive/hazardous) plating line wastewater sludge. The uraniun contaminated sludge resulted from nickel plating of depleted uranium targets, which were subsequently irradiated to produce plutonium for the weapons program. With the end of the ``cold war,`` no virgin plutonium weapons production is forecast, and only the currant SRS inventory of stored mixed plating line waste must be treated and disposed. A Life Cycle Cost analysis was used by WSRC to determine that the most cost effective approach was to treat the waste by a hazardous waste management sub-contractor, in a one time campaign. The analysis indicated that {approximately}$40 million could be saved by this approach, vs. the original plan to construct a permanent SRS treatment facility. The sub-contractor will mobilize treatment equipment will be disposed to on-site SRS disposal vaults. This new approach also required a re-negotiation of a federal facility compliance agreement between the DOE and the Environmental Protection Agency.

  7. Treatment and disposal of a mixed F006 plating line sludge at the Savannah River Site

    SciTech Connect

    Pickett, J.B.; Musall, J.C.; Martin, H.L.

    1993-01-01

    The Westinghouse Savannah River Company (WSRC), as the operating contractor for the Department of Energy (DOE) at the Savannah River Site (SRS) is implementing a program to treat and stabilize approximately 750,000 gallons of an F006 mixed (radioactive/hazardous) plating line wastewater sludge. The uraniun contaminated sludge resulted from nickel plating of depleted uranium targets, which were subsequently irradiated to produce plutonium for the weapons program. With the end of the cold war,'' no virgin plutonium weapons production is forecast, and only the currant SRS inventory of stored mixed plating line waste must be treated and disposed. A Life Cycle Cost analysis was used by WSRC to determine that the most cost effective approach was to treat the waste by a hazardous waste management sub-contractor, in a one time campaign. The analysis indicated that [approximately]$40 million could be saved by this approach, vs. the original plan to construct a permanent SRS treatment facility. The sub-contractor will mobilize treatment equipment will be disposed to on-site SRS disposal vaults. This new approach also required a re-negotiation of a federal facility compliance agreement between the DOE and the Environmental Protection Agency.

  8. LONG-TERM CHANGES IN MERCURY CONCENTRATIONS IN FISH FROM THE MIDDLE SAVANNAH RIVER

    SciTech Connect

    Paller, M; Bill Littrell, B

    2007-01-02

    Total mercury levels were measured in largemouth bass (Micropterus salmoides), ''sunfishes'' (Lepomis spp)., and ''catfish'' (primarily Ameiurus spp.) from 1971 to 2004 in the middle reaches of the Savannah River, which drains the coastal plain of the southeastern U.S. Mercury levels were highest in 1971 but declined over the next ten years due to the mitigation of point sources of industrial pollution. Mercury levels began to increase in the 1980s as a possible consequence of mercury inputs from tributaries and associated wetlands where mercury concentrations were significantly elevated in water and fish. Mercury levels in Savannah River fish decreased sharply in 2001-2003 coincident with a severe drought in the Savannah River basin, but returned to previous levels in 2004 with the resumption of normal precipitation. Regression models showed that mercury levels in Savannah River fish changed significantly over time and were affected by river discharge. Despite temporal changes, there was little overall difference in Savannah River fish tissue mercury levels between 1971 and 2004.

  9. Individual and population dose to users of the Savannah River following K-Reactor tritium release

    SciTech Connect

    Carlton, W.H.; Hamby, D.M.

    1992-12-31

    Approximately 5700 curies of tritium were released to Pen Branch between December 22, 1991 and December 25, 1991. As expected, the tritiated water traveled through the Savannah River swamp to Steel Creek and the Savannah River. Elevated tritium concentrations in the river at Becks Ferry (Beaufort-Jasper) and Abercorn Creek (Port Wentworth) has caused some concern among downstream water users as to the amount of tritium available for uptake through the domestic drinking water supplies at the Beaufort-Jasper and Port Wentworth water treatment facilities. Radiation dose to the downstream drinking water population is estimated in this report.

  10. Determination of the 100-year flood plain on Upper Three Runs and selected tributaries, and the Savannah River at the Savannah River site, South Carolina, 1995

    USGS Publications Warehouse

    Lanier, T.H.

    1996-01-01

    The 100-year flood plain was determined for Upper Three Runs, its tributaries, and the part of the Savannah River that borders the Savannah River Site. The results are provided in tabular and graphical formats. The 100-year flood-plain maps and flood profiles provide water-resource managers of the Savannah River Site with a technical basis for making flood-plain management decisions that could minimize future flood problems and provide a basis for designing and constructing drainage structures along roadways. A hydrologic analysis was made to estimate the 100-year recurrence- interval flow for Upper Three Runs and its tributaries. The analysis showed that the well-drained, sandy soils in the head waters of Upper Three Runs reduce the high flows in the stream; therefore, the South Carolina upper Coastal Plain regional-rural-regression equation does not apply for Upper Three Runs. Conse- quently, a relation was established for 100-year recurrence-interval flow and drainage area using streamflow data from U.S. Geological Survey gaging stations on Upper Three Runs. This relation was used to compute 100-year recurrence-interval flows at selected points along the stream. The regional regression equations were applicable for the tributaries to Upper Three Runs, because the soil types in the drainage basins of the tributaries resemble those normally occurring in upper Coastal Plain basins. This was verified by analysis of the flood-frequency data collected from U.S. Geological Survey gaging station 02197342 on Fourmile Branch. Cross sections were surveyed throughout each reach, and other pertinent data such as flow resistance and land-use were col- lected. The surveyed cross sections and computed 100-year recurrence-interval flows were used in a step-backwater model to compute the 100-year flood profile for Upper Three Runs and its tributaries. The profiles were used to delineate the 100-year flood plain on topographic maps. The Savannah River forms the southwestern border

  11. PLUTONIUM SOLUBILITY IN SIMULATED SAVANNAH RIVER SITE WASTE SOLUTIONS

    SciTech Connect

    Rudisill, T.; Hobbs, D.; Edwards, T.

    2010-09-27

    To address the accelerated disposition of the supernate and salt portions of Savannah River Site (SRS) high level waste (HLW), solubility experiments were performed to develop a predictive capability for plutonium (Pu) solubility. A statistically designed experiment was used to measure the solubility of Pu in simulated solutions with salt concentrations and temperatures which bounded those observed in SRS HLW solutions. Constituents of the simulated waste solutions included: hydroxide (OH{sup -}), aluminate (Al(OH){sub 4}{sup -}), sulfate (SO{sub 4}{sup 2-}), carbonate (CO{sub 3}{sup 2-}), nitrate (NO{sub 3}{sup -}), and nitrite (NO{sub 2}{sup -}) anions. Each anion was added to the waste solution in the sodium form. The solubilities were measured at 25 and 80 C. Five sets of samples were analyzed over a six month period and a partial sample set was analyzed after nominally fifteen months of equilibration. No discernable time dependence of the measured Pu concentrations was observed except for two salt solutions equilibrated at 80 C which contained OH{sup -} concentrations >5 mol/L. In these solutions, the Pu solubility increased with time. This observation was attributed to the air oxidation of a portion of the Pu from Pu(IV) to the more soluble Pu(V) or Pu(VI) valence states. A data driven approach was subsequently used to develop a modified response surface model for Pu solubility. Solubility data from this study and historical data from the literature were used to fit the model. The model predicted the Pu solubility of the solutions from this study within the 95% confidence interval for individual predictions and the analysis of variance indicated no statistically significant lack of fit. The Savannah River National Laboratory (SRNL) model was compared with predicted values from the Aqueous Electrolyte (AQ) model developed by OLI Systems, Inc. and a solubility prediction equation developed by Delegard and Gallagher for Hanford tank waste. The agreement between

  12. Deployment of Performance Management Methodology as part of Liquid Waste Program at Savannah River Site - 12178

    SciTech Connect

    Prod'homme, A.; Drouvot, O.; Gregory, J.; Barnes, B.; Hodges, B.; Hart, M.

    2012-07-01

    In 2009, Savannah River Remediation LLC (SRR) assumed the management lead of the Liquid Waste (LW) Program at the Savannah River Site (SRS). The four SRR partners and AREVA, as an integrated subcontractor are performing the ongoing effort to safely and reliably: - Close High Level Waste (HLW) storage tanks; - Maximize waste throughput at the Defense Waste Processing Facility (DWPF); - Process salt waste into stable final waste form; - Manage the HLW liquid waste material stored at SRS. As part of these initiatives, SRR and AREVA deployed a performance management methodology based on Overall Equipment Effectiveness (OEE) at the DWPF in order to support the required production increase. This project took advantage of lessons learned by AREVA through the deployment of Total Productive Maintenance and Visual Management methodologies at the La Hague reprocessing facility in France. The project also took advantage of measurement data collected from different steps of the DWPF process by the SRR team (Melter Engineering, Chemical Process Engineering, Laboratory Operations, Plant Operations). Today the SRR team has a standard method for measuring processing time throughout the facility, a reliable source of objective data for use in decision-making at all levels, and a better balance between engineering department goals and operational goals. Preliminary results show that the deployment of this performance management methodology to the LW program at SRS has already significantly contributed to the DWPF throughput increases and is being deployed in the Saltstone facility. As part of the liquid waste program on Savannah River Site, SRR committed to enhance production throughput of DWPF. Beyond technical modifications implemented at different location of the facility, SRR deployed performance management methodology based on OEE metrics. The implementation benefited from the experience gained by AREVA in its own facilities in France. OEE proved to be a valuable tool in order

  13. Savannah River Site Waste Removal Program - Past, Present and Future

    SciTech Connect

    Saldivar, E.

    2002-02-25

    The Savannah River Site has fifty-one high level waste tanks in various phases of operation and closure. These tanks were originally constructed to receive, store, and treat the high level waste (HLW) created in support of the missions assigned by the Department of Energy (DOE). The Federal Facilities Agreement (FFA) requires the high level waste to be removed from the tanks and stabilized into a final waste form. Additionally, closure of the tanks following waste removal must be completed. The SRS HLW System Plan identifies the interfaces of safe storage, waste removal, and stabilization of the high level waste and the schedule for the closure of each tank. HLW results from the dissolution of irradiated fuel components. Desired nuclear materials are recovered and the byproducts are neutralized with NaOH and sent to the High Level Waste Tank Farms at the SRS. The HLW process waste clarifies in the tanks as the sludge settles, resulting in a layer of dense sludge with salt supernate settling above the sludge. Salt supernate is concentrated via evaporation into saltcake and NaOH liquor. This paper discusses the history of SRS waste removal systems, recent waste removal experiences, and the challenges facing future removal operations to enhance efficiency and cost effectiveness. Specifically, topics will include the evolution and efficiency of systems used in the 1960's which required large volumes of water to current systems of large centrifugal slurry pumps, with significant supporting infrastructure and safety measures. Interactions of this equipment with the waste tank farm operations requirements will also be discussed. The cost and time improvements associated with these present-day systems is a primary focus for the HLW Program.

  14. Natural radioactivity in ground water near the Savannah River Site

    SciTech Connect

    Price, V. Jr. ); Michel, J. )

    1990-08-01

    A study of natural radioactivity in groundwater on and adjacent to the Savannah River Site (SRS) in Aiken (SC) was conducted to determine the spatial and temporal variations in the concentration of specific radionuclides. All available measurements for gross alpha particle activity, gross beta activity, uranium, Ra-226, Ra-228, and radon were collated. Relatively few radionuclide-specific results were found. Twenty samples from drinking water supplies in the area were collected in October 1987 and analyzed for U-238, U-234, Ra-226, Ra-228, and Rn-222. The aquifer type for each public water supply system was determined, and statistical analyses were conducted to detect differences among aquifer types and geographic areas defined at the country level. For samples from the public water wells and distribution systems on and adjacent to the site, most of the gross alpha particle activity could be attributed to Ra-226. Aquifer type was an important factor in determining the level of radioactivity in groundwater. The distribution and geochemical factors affecting the distribution of each radionuclide for the different aquifer types are discussed in detail. Statistical analyses were also run to test for aerial differences, among counties and the site. For all types of measurements, there were no differences in the distribution of radioactivity among the ten counties in the vicinity of the site or the site itself. The mean value for the plant was the lowest of all geographic areas for gross alpha particle activity and radon, intermediate for gross beta activity, and in the upper ranks for Ra-226 and Ra-228. It is concluded that the drinking water quality onsite is comparable with that in the vicinity. 19 refs., 5 figs., 5 tabs.

  15. Overview of the Savannah River reactor surveillance program

    SciTech Connect

    Sindelar, R.L.; Thomas, J.K.; Baumann, N.P.

    1991-01-01

    Preliminary radiation effects studies, now nearing completion, are based upon short-term irradiations in the High Flux Isotope Reactor (HFIR) and University of Buffalo Reactor (UBR). The purpose of these studies is to assess the impact of radiation effects on the performance and service life of Savannah River Site (SRS) reactor components. The SRS reactor surveillance program was simultaneously established in order to validate the results of these short-term irradiations under conditions more applicable to the SRS reactor components. The main conditions of interest include: temperature, moderator chemistry and neutron spectrum. The materials employed in both the surveillance and short-term irradiation programs were taken from the SRS R-reactor process piping and included base, weld, and heat-effected zone metal samples in both the C-L and L-C orientations. Test specimen types include tensile, Charpy V-notch, compact tension, constant extension rate test, and wedge-opening-load. A program schedule has been established for the irradiation and testing of surveillance specimens. The surveillance capsules are currently undergoing irradiation near the center of the SRS K-rector core and will remain in this location until their total fast fluence is equal to the current maximum reactor tank wall exposure. The bulk of the specimens will then be moved to blanket capsules at the edge of the core in order to track the wall exposure. A small portion of the specimens will be removed and tested, and a third group of specimens will be removed from the central core position after they have accumulated a thermal fluence 50% greater than the current maximum tank wall exposure. Specimen groups will be removed from the blanket capsules and tested periodically. Additional capsules may be inserted in order to generate flow fluence or high thermal to fast flux ratio data. 17 refs.

  16. Overview of the Savannah River reactor surveillance program

    SciTech Connect

    Sindelar, R.L.; Thomas, J.K.; Baumann, N.P.

    1991-12-31

    Preliminary radiation effects studies, now nearing completion, are based upon short-term irradiations in the High Flux Isotope Reactor (HFIR) and University of Buffalo Reactor (UBR). The purpose of these studies is to assess the impact of radiation effects on the performance and service life of Savannah River Site (SRS) reactor components. The SRS reactor surveillance program was simultaneously established in order to validate the results of these short-term irradiations under conditions more applicable to the SRS reactor components. The main conditions of interest include: temperature, moderator chemistry and neutron spectrum. The materials employed in both the surveillance and short-term irradiation programs were taken from the SRS R-reactor process piping and included base, weld, and heat-effected zone metal samples in both the C-L and L-C orientations. Test specimen types include tensile, Charpy V-notch, compact tension, constant extension rate test, and wedge-opening-load. A program schedule has been established for the irradiation and testing of surveillance specimens. The surveillance capsules are currently undergoing irradiation near the center of the SRS K-rector core and will remain in this location until their total fast fluence is equal to the current maximum reactor tank wall exposure. The bulk of the specimens will then be moved to blanket capsules at the edge of the core in order to track the wall exposure. A small portion of the specimens will be removed and tested, and a third group of specimens will be removed from the central core position after they have accumulated a thermal fluence 50% greater than the current maximum tank wall exposure. Specimen groups will be removed from the blanket capsules and tested periodically. Additional capsules may be inserted in order to generate flow fluence or high thermal to fast flux ratio data. 17 refs.

  17. USED NUCLEAR MATERIALS AT SAVANNAH RIVER SITE: ASSET OR WASTE?

    SciTech Connect

    Magoulas, V.

    2013-06-03

    The nuclear industry, both in the commercial and the government sectors, has generated large quantities of material that span the spectrum of usefulness, from highly valuable (“assets”) to worthless (“wastes”). In many cases, the decision parameters are clear. Transuranic waste and high level waste, for example, have no value, and is either in a final disposition path today, or – in the case of high level waste – awaiting a policy decision about final disposition. Other materials, though discardable, have intrinsic scientific or market value that may be hidden by the complexity, hazard, or cost of recovery. An informed decision process should acknowledge the asset value, or lack of value, of the complete inventory of materials, and the structure necessary to implement the range of possible options. It is important that informed decisions are made about the asset value for the variety of nuclear materials available. For example, there is a significant quantity of spent fuel available for recycle (an estimated $4 billion value in the Savannah River Site’s (SRS) L area alone); in fact, SRS has already blended down more than 300 metric tons of uranium for commercial reactor use. Over 34 metric tons of surplus plutonium is also on a path to be used as commercial fuel. There are other radiological materials that are routinely handled at the site in large quantities that should be viewed as strategically important and / or commercially viable. In some cases, these materials are irreplaceable domestically, and failure to consider their recovery could jeopardize our technological leadership or national defense. The inventories of nuclear materials at SRS that have been characterized as “waste” include isotopes of plutonium, uranium, americium, and helium. Although planning has been performed to establish the technical and regulatory bases for their discard and disposal, recovery of these materials is both economically attractive and in the national

  18. GEOTECHNICAL ENGINEERING AT THE SAVANNAH RIVER SITE AND BECHTEL

    SciTech Connect

    Lewis, M; I. Arango, I; Michael Mchood, M

    2007-07-17

    The authors describe two aspects of geotechnical engineering; site characterization utilizing the CPT and recognition of aging as a factor affecting soil properties. These methods were pioneered by Professor Schmertmann and are practiced by the Bechtel Corporation in general and at the Savannah River Site in South Carolina, in particular. This paper describes a general subsurface exploration approach that we have developed over the years. It consists of ''phasing'' the investigation, employing the principles of the observational method suggested by Peck (1969) and others. In doing so, we have found that the recommendations proposed by Sowers in terms of borehole spacing and exploration cost, are reasonable for developing an investigation program, recognizing that through continuous review the final investigation program will evolve. At the SRS shallow subsurface soils are of Eocene and Miocene age. It was recognized that the age of these deposits would have a marked effect on their cyclic resistance. A field investigation and laboratory testing program was devised to measure and account for aging as it relates to the cyclic resistance of the site soils. Recently, a panel of experts (Youd et al., 2001) has made recommendations regarding the liquefaction assessment of soils. This paper will address some of those recommendations in the context of re-assessing the liquefaction resistance of the soils at the SRS. It will be shown that, indeed, aging plays a major role in the cyclic resistance of the soils at the SRS, and that aging should be accounted for in liquefaction potential assessments for soils older than Holocene age.

  19. A Three-Year Study of Ichyoplankton in Coastal Plains Reaches of the Savannah River Site and its Tributaries

    SciTech Connect

    Martin, D.

    2007-03-05

    Altering flow regimes of rivers has large effects on native floras and faunas because native species are adapted to the natural flow regime, many species require lateral connectivity with floodplain habitat for feeding or spawning, and the change in regime often makes it possible for invasive species to replace natives (Bunn & Arthington 2002). Floodplain backwaters, both permanent and temporary, are nursery areas for age 0+ fish and stable isotope studies indicate that much of the productivity that supports fish larvae is autochthonous to these habitats (Herwig et al. 2004). Limiting access by fish to floodplain habitat for feeding, spawning and nursery habitat is one of the problems noted with dams that regulate flow in rivers and is considered to be important as an argument to remove dams and other flow regulating structures from rivers (Shuman 1995; Bednarek 2001). While there have been a number of studies in the literature about the use of floodplain habitat for fish reproduction (Copp 1989; Killgore & Baker 1996; Humphries, et al. 1999; Humphries and Lake 2000; Crain et al. 2004; King 2004) there have been only a few studies that examined this aspect of stream ecology in more than a cursory way. The study reported here was originally designed to determine whether the Department of Energy's (DOE) Savannah River Site was having a negative effect on fish reproduction in the Savannah River but its experimental design allowed examination of the interactions between the river, the floodplain and the tributaries entering the Savannah River across this floodplain. This study is larger in length of river covered than most in the literature and because of its landscape scale may be in important indicator of areas where further study is required.

  20. Savannah River Archaeological Research Program annual report, Fiscal years 1988--1989

    SciTech Connect

    Not Available

    1989-09-01

    The beginning of a new era for the Savannah River Archaeological Research Program (SRARP), South Carolina Institute of Archaeology and Anthropology (SCIAA), University of South Carolina (USC) came in 1987 with the initiation of a cooperative agreement for archaeological resource management, research and public education. After 15 years and six different contracts the Savannah River Archaeological Research Program, under the leadership of Glen T. Hanson, negotiated a cooperative grant with the Savannah River Operations Office, United States Department of Energy (DOE) to conduct archaeological research in the Savannah River Valley focusing on the Savannah River Site (SRS). Archaeological resource management advisement to DOE involves recommendations regarding the evaluation, conservation and preservation of archaeological resources. SRARP maintains a comprehensive database of archaeological information for over 850 currently known sites located thus far on the 300 square mile SRS. All records, artifact collections and analytical reports for these sites are maintained at the SRARP lab and are available for scholarly research. The site files have been updated and verified and are accessible through Macintosh computers with Claris' Filemaker{reg sign} program. 51 refs.

  1. Restart of K-Reactor, Savannah River Site: Safety evaluation report

    SciTech Connect

    Not Available

    1991-04-01

    This Safety Evaluation Report (SER) focuses on those issues required to support the restart of the K-Reactor at the Savannah River Plant. This SER provides the safety criteria for restart and documents the results of the staff reviews of the DOE and operating contractor activities to meet these criteria. To develop the restart criteria for the issues discussed in this SER, the Savannah River Restart Office and Savannah River Special Projects Office staffs relied, when possible, on commercial industry codes and standards and on NRC requirements and guidelines for the commercial nuclear industry. However, because of the age and uniqueness of the Savannah River reactors, criteria for the commercial plants were not always applicable. In these cases, alternate criteria were developed. The restart criteria applicable to each of the issues are identified in the safety evaluations for each issue. The restart criteria identified in this report are intended to apply only to restart of the Savannah River reactors. Following the development of the acceptance criteria, the DOE staff and their support contractors evaluated the results of the DOE and operating contractor (WSRC) activities to meet these criteria. The results of those evaluations are documented in this report. Deviations or failures to meet the requirements are either justified in the report or carried as open or confirmatory items to be completed and evaluated in supplements to this report before restart. 62 refs., 1 fig.

  2. The influence of Savannah River discharge and changing SRS cooling water requirements on the potential entrainment of ichthyoplankton at the SRS Savannah River intakes

    SciTech Connect

    Paller, M.H.

    1992-08-01

    Entrainment (i.e., withdrawal of fish larvae and eggs in cooling water) at the SRS Savannah River intakes is greatest when periods of high river water usage coincide with low river dischargeduring the spawning season. American shad and striped bass are the two species of greatest concern because of their recreational and/or commercial importance and because they produce drifting eggs and larvae vulnerable to entrainment. In the mid-reaches of the Savannah River, American shad and striped bass spawn primarily during April and May. An analysis of Savannah River discharge during April and May 1973--1989 indicated the potential for entrainment of 4--18% of the American shad and striped bass larvae and eggs that drifted past the SRS. This analysis assumed the concurrent operation of L-, K-, and P-Reactors. Additional scenarios investigated were: (1) shutting down L- and P-Reactors, and operating K-Reactor with a recycle cooling tower; and (2) shutting down L- and P-Reactors, eliminating minimum flows to Steel Creek, and operating K-Reactor with a recycle cooling tower. The former scenario reduced potential entrainment to 0.7--3.3%, and the latter scenario reduced potential entrainment to 0.20.8%. Thus, the currently favored scenario of operating K-Reactor with a cooling tower and not operating L- and P-Reactors represents a significant lessening of the impact of SRS operations.

  3. Savannah River Site Footprint Reduction Results under the American Recovery and Reinvestment Act - 13302

    SciTech Connect

    Flora, Mary; Adams, Angelia; Pope, Robert

    2013-07-01

    The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, managed and operated by Savannah River Nuclear Solutions. Construction of SRS began in the early 1950's to enhance the nation's nuclear weapons capability. Nuclear weapons material production began in the early 1950's, eventually utilizing five production reactors constructed to support the national defense mission. Past operations have resulted in releases of hazardous constituents and substances to soil and groundwater, resulting in 515 waste sites with contamination exceeding regulatory thresholds. More than 1,000 facilities were constructed onsite with approximately 300 of them considered radiological, nuclear or industrial in nature. In 2003, SRS entered into a Memorandum of Agreement with its regulators to accelerate the cleanup using an Area Completion strategy. The strategy was designed to focus cleanup efforts on the 14 large industrial areas of the site to realize efficiencies of scale in the characterization, assessment, and remediation activities. This strategy focuses on addressing the contaminated surface units and the vadose zone and addressing groundwater plumes subsequently. This approach streamlines characterization and remediation efforts as well as the required regulatory documentation, while enhancing the ability to make large-scale cleanup decisions. In February 2009, Congress approved the American Reinvestment and Recovery Act (ARRA) to create jobs and promote economic recovery. At SRS, ARRA funding was established in part to accelerate the completion of environmental remediation and facility deactivation and decommissioning (D and D). By late 2012, SRS achieved 85 percent footprint reduction utilizing ARRA funding by accelerating and coupling waste unit remediation with D and D of remnant facilities. Facility D and D activities were sequenced and permitted with

  4. Long-term monitoring of fleshy fruit and hard mast production and seasonal bird distribution at the Savannah River Site, South Carolina.

    SciTech Connect

    Greenberg, Cathryn, H.; Levey, Douglas J.

    2009-06-15

    A final report of Fruit and hard mast production in five habitat types at SRS with a comparison of fruit consumption by fledgling versus adult birds at SRS and Relative importance of fruit, seeds, and insects in the diets of overwintering birds at SRS.

  5. Close out report for the archeological investigations on the Savannah River Plant

    SciTech Connect

    Hanson, G.T. Jr.

    1983-03-01

    A brief review is presented of the activities of the Savannah River Plant Archaeological Research Program. One hundred forty-five archaeological sites were investigated and recorded in six surveys. These surveys are (1) the survey of the proposed independent spent fuel storage facility site; (2) the survey of the proposed defense waste processing facility; (3) the survey of the proposed Saltcrete area of the defense waste processing facility; (4) the survey of the Steel Creek for the L-Area reactivation project; (5) the general inventory of Savannah River Plant archaeological sites; and (6) the stratified, random sampling of the Four Mile Creek watershed. Also included is a survey of the remnant and relocated cemetaries present on the site and a study of the sedimentological history of the Savannah River Plant flood plain. (ACR)

  6. Establishment of a viable population of red-cockaded woodpeckers at the Savannah River Site

    SciTech Connect

    Allen, D.H.

    1989-01-01

    In 1985 the Southeastern Forest Experiment Station in cooperation with the Department of Energy (DOE), the Savannah River Forest Station (SRFS) and the Savannah River Ecology Laboratory (SREL) initiated a research/management program to restore a viable population of red-cockaded woodpeckers (RCW) to the Savannah River Site (SRS). The program has progresses in two phases. The first phase (1985-1987) focused on stabilizing the declining RCW population at SRS. The second phase (1988-present) has focused on facilitating population expansion. In 1989 we have focused our efforts on development of techniques for excavating new RCW cavities, identification of old-growth stands with the potential of providing new nesting habitat to support population expansion, continued flying squirrel control, continued translocations of RCW's as needed, and monitoring clan composition and reproduction.

  7. Savannah River Region: Transition between the Gulf and Atlantic Coastal Plains. Proceedings

    SciTech Connect

    Zullo, V.A.; Harris, W.B.; Price, V.

    1990-12-31

    The focus of the this conference of Coastal Plains geologists was on the Savannah River region of Georgia and South Carolina, and particularly on the geology of the US Department of Energy`s 300 square mile Savannah River Site (SRS) in western South Carolina. Current geological studies indicate that the Mesozoic-Cenozoic section in the Savannah River region is transitional between that of the Gulf Coastal Plain to the southwest and that of the Atlantic Coastal Plain to the northeast. With the transitional aspect of the region as its theme, the first session was devoted to overviews of Cretaceous and Paleogene geology in the Gulf and Atlantic Coastal Plains. Succeeding presentations and resulting discussions dealt with more specific problems in structural, lithostratigraphic, hydrological, biostratigraphic, and cyclostratigraphic analysis, and of correlation to standard stratigraphic frameworks. For these conference proceedings, individual papers have been processed separately for the Energy Data Base.

  8. Long-term changes in mercury concentrations in fish from the middle Savannah River.

    PubMed

    Paller, M H; Littrell, James W

    2007-09-01

    Total mercury levels were measured in largemouth bass (Micropterus salmoides), "sunfish" (Lepomis spp.), and "catfish" (primarily Ameiurus spp. and Ictalurus punctatus) from 1971 to 2004 in the middle Savannah River (river km 191 to 302), which drains the coastal plain of the southeastern U.S. Total mercury concentrations were higher in largemouth bass (overall mean of 0.55 mg/kg from 1971 to 2004), a piscivorous (trophic level 4) species than in the other taxa (means of 0.22-0.26 mg/kg), but temporal trends were generally similar among taxa. Mercury levels were highest in 1971 but declined over the next 10 years due to the mitigation of point source industrial pollution. Mercury levels in fish began to increase in the 1980s as a likely consequence of mercury inputs from tributaries and associated wetlands where mercury concentrations were significantly elevated in water and fish. Mercury levels in Savannah River fish decreased sharply in 2001-2003 coincident with a severe drought in the Savannah River basin, but returned to previous levels in 2004 with the resumption of normal precipitation. Regression models showed that mercury levels in fish changed significantly over time and were affected by river discharge. Mercury levels in Savannah River fish were only slightly lower in 2004 (0.3 to 0.8 mg/kg) than in 1971 (0.4 to 1.0 mg/kg) despite temporal changes during the intervening years. PMID:17544059

  9. Processing Tritiated Water at the Savannah Rivver Site: A Production Scale Demonstration

    SciTech Connect

    Sessions, K

    2004-11-04

    The Palladium Membrane Reactor (PMR) process was installed in the Tritium Facilities at the Savannah River Site to perform a production-scale demonstration for the recovery of tritium from tritiated water adsorbed on molecular sieve (zeolite). Unlike the current recovery process that utilizes magnesium, the PMR offers a means to process tritiated water in a more cost effective and environmentally friendly manner. The design and installation of the large-scale PMR process was part of a collaborative effort between the Savannah River Site and Los Alamos National Laboratory. The PMR process operated at the Savannah River Site between May 2001 and April 2003. During the initial phase of operation the PMR processed thirty-four kilograms of tritiated water from the Princeton Plasma Physics Laboratory. The water was processed in fifteen separate batches to yield approximately 34,400 liters (STP) of hydrogen isotopes. Each batch consisted of round-the-clock operations for approximately nine days. In April 2003 the reactor's palladium-silver membrane ruptured resulting in the shutdown of the PMR process. Reactor performance, process performance and operating experiences have been evaluated and documented. A performance comparison between PMR and current magnesium process is also documented.

  10. Comprehensive Cooling Water Study: Volume 8, Waterfowl, Savannah River Plant: Final report

    SciTech Connect

    Mackey, H.E.

    1987-09-01

    Large numbers of waterfowl have been present on the Savannah River Plant (SRP) since public access to the site was terminated in the early 1950s. Thirty-one species of waterfowl have been documented as occurring on the SRP. The Savannah River Ecology Laboratory (SREL) has been conducting waterfowl research and surveys on the site for the past 15 years. This research has included work on waterfowl use of the SRP, wood duck reproductive biology, and waterfowl wintering ecology. Waterfowl use of the site has been assessed through aerial surveys of the Par Pond system and the SRP Savannah River swamp and through roost counts in the Steel Creek drainage. Aerial surveys have proven to be the most successful method of estimating waterfowl numbers each winter. The most abundant waterfowl species in the Savannah River swamp were consistently mallards and wood ducks, as determined by numbers counted. Both of these species have increased on the SRP. Mid- winter mallard numbers in both the Atlantic Flyway and in South Carolina have decreased during the same time period. In the SRP Savannah River swamp, the Steel Creek Delta and the sloughs between the Four Mile Creek and Pen Branch deltas had more mallards than did the Beaver Dam Creek Delta or the Pen Branch Delta. No differences were found for wood duck counts between the Four Mile Creek Delta sloughs, the Steel Creek Delta, or the Beaver Dam Creek Delta. The Savannah River swamp was used extensively for foraging by both mallards and wood ducks. 58 refs., 52 figs., 19 tabs.

  11. SAES St 909 Getter Testing at the Savannah River National Laboratory

    SciTech Connect

    Klein, J. E.; Holder, J. E

    2005-09-07

    Process gas tritium stripper technology has gone from catalytic oxidation followed by absorption on molecular sieve/zeolite beds to non-evaporate metal getter technology. SAES Getters produces a number of commercial getter products including St 909. St 909, a Zr-Mn-Fe alloy, is sold in pellet form, can decompose (''crack'') a number of process gas impurities, and retains lower levels of tritium than other getters. The performance of this material to remove process impurities, especially methane, under of variety of operating conditions has been part of a Savannah River National Laboratory (SRNL) for five years. St 909 has been tested at the bench (6 gram) scale, the pilot (500 gram) scale, and at the full (5300) gram scale under a variety of test conditions. This paper gives a brief summary of test results obtained for the different scale tests.

  12. Life cycle cost analysis changes mixed waste treatment program at the Savannah River Site. Revision 1

    SciTech Connect

    Pickett, J.B.; England, J.L.; Martin, H.L.

    1992-12-31

    A direct result of the reduced need for weapons production has been a re-evaluation of the treatment projects for mixed (hazardous/radioactive) wastes generated from metal finishing and plating operations and from a mixed waste incinerator at the Savannah River Site (SRS). A Life Cycle Cost (LCC) analysis was conducted for two waste treatment projects to determine the most cost effective approach in response to SRS mission changes. A key parameter included in the LCC analysis was the cost of the disposal vaults required for the final stabilized wasteform(s) . The analysis indicated that volume reduction of the final stabilized wasteform(s) can provide significant cost savings. The LCC analysis demonstrated that one SRS project could be eliminated, and a second project could be totally ``rescoped and downsized.`` The changes resulted in an estimated Life Cycle Cost saving (over a 20 year period) of $270,000,000.

  13. Life cycle cost analysis changes mixed waste treatment program at the Savannah River Site

    SciTech Connect

    Pickett, J.B.; England, J.L.; Martin, H.L.

    1992-01-01

    A direct result of the reduced need for weapons production has been a re-evaluation of the treatment projects for mixed (hazardous/radioactive) wastes generated from metal finishing and plating operations and from a mixed waste incinerator at the Savannah River Site (SRS). A Life Cycle Cost (LCC) analysis was conducted for two waste treatment projects to determine the most cost effective approach in response to SRS mission changes. A key parameter included in the LCC analysis was the cost of the disposal vaults required for the final stabilized wasteform(s) . The analysis indicated that volume reduction of the final stabilized wasteform(s) can provide significant cost savings. The LCC analysis demonstrated that one SRS project could be eliminated, and a second project could be totally rescoped and downsized.'' The changes resulted in an estimated Life Cycle Cost saving (over a 20 year period) of $270,000,000.

  14. High-level waste processing at the Savannah River Site: An update

    SciTech Connect

    Marra, J.E.; Bennett, W.M.; Elder, H.H.; Lee, E.D.; Marra, S.L.; Rutland, P.L.

    1997-09-01

    The Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) in Aiken, SC mg began immobilizing high-level radioactive waste in borosilicate glass in 1996. Currently, the radioactive glass is being produced as a ``sludge-only`` composition by combining washed high-level waste sludge with glass frit. The glass is poured in stainless steel canisters which will eventually be disposed of in a permanent, geological repository. To date, DWPF has produced about 100 canisters of vitrified waste. Future processing operations will, be based on a ``coupled`` feed of washed high-level waste sludge, precipitated cesium, and glass frit. This paper provides an update of the processing activities completed to date, operational/flowsheet problems encountered, and programs underway to increase production rates.

  15. Transporter Development for the Tritium Extraction Facility at the Savannah River Site

    SciTech Connect

    Gordon, J.

    1998-12-17

    The Commercial Light Water Reactor-Tritium Extraction Facility (CLWR-TEF) is planned for location at the Savannah River Site (SRS) as part of the US Department of Energy CLWR tritium production alternative. This new facility will rely on processes and equipment that are significantly different from those proven in the past or currently in use at SRS. For instance, the CLWR-TEF reference design employs remote modules to provide an inert processing atmosphere, secondary confinement for tritium and the primary confinement for particulate contamination. The primary component of this modular system is the Transporter. A Transporter mock-up was developed to demonstrate concept feasibility of the required processing functions (sealing, attachment/alignment and materials handling). The module design, the seal door selection, and the planned test program are discussed.

  16. Determination of noble metals in Savannah River Site high-level radioactive sludge

    SciTech Connect

    Coleman, C.J.; Kinard, W.F.; Bibler, N.E.; Bickford, D.F.; Ramsey, W.G.

    1990-01-01

    High-level radioactive sludge at the Savannah River Site (SRS) will be processed at the Defense Waste Processing Facility (DWPF) into durable borosilicate glass wasteforms. The sludges are analyzed for elemental content before processing to ensure compatibility with the glass-making processes. Noble metal fission products in sludge, can under certain conditions, cause problems in the glass melter. Therefore, reliable noble metal determinations are important. The scheme used to measure noble metals in SRS sludges consists of dissolving sludge with hot aqua regia followed by determinations with inductively coupled plasma-atomic emission spectroscopy (ICP-AES) and ICP-Mass Spectroscopy (ICP-MS) techniques. ICP-MS is the preferred method for measuring trace levels of noble metals in SRS radioactive waste because of superior sensitivity. Analytical results are presented for the two major types of SRS sludge.

  17. Determination of noble metals in Savannah River Site high-level radioactive sludge

    SciTech Connect

    Coleman, C.J.; Kinard, W.F.; Bibler, N.E.; Bickford, D.F.; Ramsey, W.G.

    1990-12-31

    High-level radioactive sludge at the Savannah River Site (SRS) will be processed at the Defense Waste Processing Facility (DWPF) into durable borosilicate glass wasteforms. The sludges are analyzed for elemental content before processing to ensure compatibility with the glass-making processes. Noble metal fission products in sludge, can under certain conditions, cause problems in the glass melter. Therefore, reliable noble metal determinations are important. The scheme used to measure noble metals in SRS sludges consists of dissolving sludge with hot aqua regia followed by determinations with inductively coupled plasma-atomic emission spectroscopy (ICP-AES) and ICP-Mass Spectroscopy (ICP-MS) techniques. ICP-MS is the preferred method for measuring trace levels of noble metals in SRS radioactive waste because of superior sensitivity. Analytical results are presented for the two major types of SRS sludge.

  18. The determination of engineering parameters for the sanitary landfill, Savannah River Site

    SciTech Connect

    McMullin, S.R.; Smalley, R.C.; Flood, P.J.

    1993-10-01

    The Savannah River Site is a 315 square mile, Department of Energy production facility located in western South Carolina. This facility has multiple operational areas which generate a variety of waste materials. Over the nearly 40 years of operation, sanitary wastes were deposited in a 60-acre, permitted solid waste disposal facility located on the site. Refuse and other clean wastes were deposited in shallow, slit trenches, ranging in size from 20 to 50 feet-wide and approximately 400 feet long. The historical depth of deposition appears to range between 12 and 15 feet below the ground surface. Recent changes in regulations has classified some wastes contained within the landfill as hazardous wastes, necessitating the closure of this facility as a RCRA hazardous waste management facility. The focus of this paper is to present the innovative techniques used to fully determine the engineering parameters necessary to reasonably predict future settlements, for input into the closure system design.

  19. A novel use of LIMS for surveillance activities at the Savannah River Site

    SciTech Connect

    Rogier, W.J.

    2000-01-03

    The current mission of the Savannah River Site is focused primarily on cleanup and disposal of waste associated with more than 40 years of nuclear material production. However, SRS continues to provide tritium processing for the Department of Energy. Tritium, a radioactive isotope of hydrogen gas, is used to boost the explosive power of nuclear weapons. The tritium container, processed by SRS, is known as a reservoir. Part of the SRS tritium mission is to assure the safety and reliability of tritium reservoirs by conducting a series of thorough surveillance tests on a sampling of fielded reservoirs. Data from these tests have historically been stored in a database archive and reporting system known as QUADSTAR. This system was developed at the Mound Facility in the mid-1980s when Mound performed the reservoir surveillance mission for DOE. The surveillance mission and the QUADSTAR database were transferred to SRS during the downsizing of the Nuclear Weapon Complex in the mid-1990s.

  20. SAVANNAH RIVER SITE R REACTOR DISASSEMBLY BASIN IN SITU DECOMMISSIONING

    SciTech Connect

    Langton, C.; Blankenship, J.; Griffin, W.; Serrato, M.

    2009-12-03

    The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate if from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,424 cubic meters or 31,945 cubic yards. Portland cement-based structural fill materials were design and tested for the reactor ISD project and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and work flow considerations, the recommended maximum lift height is 5 feet with 24 hours between lifts. Pertinent data and information related to the SRS 105-R-Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs

  1. Archaeological resource management plan of the Savannah River Archaeological Research Program

    SciTech Connect

    Not Available

    1989-12-01

    This Archaeological Resource management Plan addresses the future cultural resource management needs of the United States Department of Energy's (DOE) Savannah River Site (SRS). The archaeological information contained herein is based on prehistoric and historic archaeological syntheses prepared by the Savannah River Archaeological Research Program (SRARP) for the SRS. The syntheses also address future research directions that will facilitate better management of the cultural resources. This document is a prelude to a Programmatic Memorandum of Agreement (PMOA) which, in conjunction with this Archaeological Resource Management Plan, will assure SRS continued compliance with all applicable federal laws and regulations in concert with any DOE plans, policies and directives. 225 refs., 21 figs., 8 tabs.

  2. Annual review of cultural resource investigations by the Savannah River Archaeological Research Program. Fiscal year 1994

    SciTech Connect

    1994-10-01

    The Savannah River Archaeological Research Program (SRARP) of the South Carolina Institute of Archaeology and Anthropology, University of South Carolina, manages archaeological resources on the Savannah River Site (SRS). An ongoing research program provides the theoretical, methodological, and empirical basis for assessing site significance within the compliance process specified by law. The SRARP maintains an active public education program for disseminating knowledge about prehistory and history, and for enhancing awareness of historic preservation. This report summarizes the management, research, and public education activities of the SRARP during Fiscal Year 1994.

  3. Demonstration of Caustic-Side Solvent Extraction with Savannah River Site High Level Waste

    SciTech Connect

    Walker, D.D.

    2001-08-27

    Researchers successfully demonstrated the chemistry and process equipment of the Caustic-Side Solvent Extraction (CSSX) flowsheet for the decontamination of high level waste using a 33-stage, 2-cm centrifugal contactor apparatus at the Savannah River Technology Center. This represents the first CSSX process demonstration using Savannah River Site (SRS) high level waste. Three tests lasting 6, 12, and 48 hours processed simulated average SRS waste, simulated Tank 37H/44F composite waste, and Tank 37H/44F high level waste, respectively.

  4. SAVANNAH RIVER SITE CAPABILITIES FOR CONDUCTING INGESTION PATHWAY CONSEQUENCE ASSESSMENTS FOR EMERGENCY RESPONSE

    SciTech Connect

    Hunter, C

    2007-12-11

    Potential airborne releases of radioactivity from facilities operated for the U. S. Department of Energy at the Savannah River Site could pose significant consequences to the public through the ingestion pathway. The Savannah River National Laboratory has developed a suite of technologies needed to conduct assessments of ingestion dose during emergency response, enabling emergency manager at SRS to develop initial protective action recommendation for state agencies early in the response and to make informed decisions on activation of additional Federal assets that would be needed to support long-term monitoring and assessment activities.

  5. Putting radiation in perspective. Appendix A. Savannah River Chapter, Health Physics Society, public lecture

    SciTech Connect

    Cofer, C.H.

    1981-06-01

    The Savannah River Chapter of the Health Physics Society has prepared and presented lectures to more than 20 civic groups in the Central Savannah River Area during the last half of 1980. The purpose of the lectures is to improve public understanding of the risks associated with ionizing radiation. Methods of preparation and presentation of the lectures are discussed along with methods used to obtain speaking invitations. Excerpts from the lectures, response to the lectures, and some typical questions from the question and answer sessions are also included.

  6. Demographic responses of amphibians to wetland restoration in Carolina bays on the Savannah River Site.

    SciTech Connect

    Kinkead, Karen E.

    2004-09-30

    This project studied the effects of wetland restoration on amphibian populations. These wetlands were Carolina bays located on the Savannah River Site, located near Aiken, S.C. The Savannah River Site is a National Environmental Research Park owned and operated by the U.S. Department of Energy. The study sites included three reference bays (functionally intact), three control bays (with active drainage ditches), six treatment bays (restored during 2001), and four bays near two of the treatment bays (in effect creating two metapopulations).

  7. Final Review of Safety Assessment Issues at Savannah River Site, August 2011

    SciTech Connect

    Napier, Bruce A.; Rishel, Jeremy P.; Bixler, Nathan E.

    2011-12-15

    At the request of Savannah River Nuclear Solutions (SRNS) management, a review team composed of experts in atmospheric transport modeling for environmental radiation dose assessment convened at the Savannah River Site (SRS) on August 29-30, 2011. Though the meeting was prompted initially by suspected issues related to the treatment of surface roughness inherent in the SRS meteorological dataset and its treatment in the MELCOR Accident Consequence Code System Version 2 (MACCS2), various topical areas were discussed that are relevant to performing safety assessments at SRS; this final report addresses these topical areas.

  8. ROBOTICS IN HAZARDOUS ENVIRONMENTS - REAL DEPLOYMENTS BY THE SAVANNAH RIVER NATIONAL LABORATORY

    SciTech Connect

    Kriikku, E.; Tibrea, S.; Nance, T.

    2010-09-27

    The Research & Development Engineering (R&DE) section in the Savannah River National Laboratory (SRNL) engineers, integrates, tests, and supports deployment of custom robotics, systems, and tools for use in radioactive, hazardous, or inaccessible environments. Mechanical and electrical engineers, computer control professionals, specialists, machinists, welders, electricians, and mechanics adapt and integrate commercially available technology with in-house designs, to meet the needs of Savannah River Site (SRS), Department of Energy (DOE), and other governmental agency customers. This paper discusses five R&DE robotic and remote system projects.

  9. Scale-Up of Palladium Powder Production Process for Use in the Tritium Facility at Westinghouse, Savannah River, SC/Summary of FY99-FY01 Results for the Preparation of Palladium Using the Sandia/LANL Process

    SciTech Connect

    David P. Baldwin; Daniel S. Zamzow; R. Dennis Vigil; Jesse T. Pikturna

    2001-08-24

    Palladium used at Savannah River (SR) for process tritium storage is currently obtained from a commercial source. In order to understand the processes involved in preparing this material, SR is supporting investigations into the chemical reactions used to synthesize this material. The material specifications are shown in Table 1. An improved understanding of the chemical processes should help to guarantee a continued reliable source of Pd in the future. As part of this evaluation, a work-for-others contract between Westinghouse Savannah River Company and Ames Laboratory (AL) was initiated. During FY98, the process for producing Pd powder developed in 1986 by Dan Grove of Mound Applied Technologies, USDOE (the Mound muddy water process) was studied to understand the processing conditions that lead to changes in morphology in the final product. During FY99 and FY00, the process for producing Pd powder that has been used previously at Sandia and Los Alamos National Laboratories (the Sandia/LANL process) was studied to understand the processing conditions that lead to changes in the morphology of the final Pd product. During FY01, scale-up of the process to batch sizes greater than 600 grams of Pd using a 20-gallon Pfaudler reactor was conducted by the Iowa State University (ISU) Chemical Engineering Department. This report summarizes the results of FY99-FY01 Pd processing work done at AL and ISU using the Sandia/LANL process. In the Sandia/LANL process, Pd is dissolved in a mixture of nitric and hydrochloric acids. A number of chemical processing steps are performed to yield an intermediate species, diamminedichloropalladium (Pd(NH{sub 3}){sub 2}Cl{sub 2}, or DADC-Pd), which is isolated. In the final step of the process, the Pd(NH{sub 3}){sub 2}Cl{sub 2} intermediate is subsequently redissolved, and Pd is precipitated by the addition of a reducing agent (RA) mixture of formic acid and sodium formate. It is at this point that the morphology of the Pd product is

  10. The Savannah River Aquatic Ecology Program: Macroinvertebrates, periphyton, and water quality: Final report, October 1984-September 1985

    SciTech Connect

    O'Hop, J.R.; Tilly, L.J.; Chimney, M.J.

    1986-06-01

    This report presents data on: (1) the taxonomic composition, biomass, and density of macroinvertebrates that colonize artificial substrate samplers placed at designated locations in the Savannah River and tributary creeks on the SRP; (2) the taxonomic composition and densities of macroinvertebrates in the drift communities of the Savannah River and five tributary creeks that drain the SRP; (3) the biomass and chlorophyll a content of periphyton communities that colonize artificial substrates in the Savannah River and tributary creeks on the SRP; (4) water-quality data for selected parameters in the Savannah River and major tributary creeks upstream, downstream, and in the vicinity of the SRP; and (5) the possible impacts of the existing and proposed SRP thermal discharges on the macroinvertebrate and periphyton communities of the Savannah River and tributary creeks.

  11. Native American prehistory of the middle Savannah River Valley. A synthesis of archaeological investigations on the Savannah River Site, Aiken and Barnwell Counties, South Carolina

    SciTech Connect

    Sassaman, K.E.; Brooks, M.J.; Hanson, G.T.; Anderson, D.G.

    1990-12-31

    Archaeological investigations on the United States Department of Energy`s (DOE) Savannah River Site (SRS) in South Carolina span 17 years and continue today through a cooperative agreement between DOE and the South Carolina Institute of Archaeology and Anthropology (SCIAA), University of South Carolina. The Savannah River Archaeological Research Program (SRARP) of SCIAA has been and continues to be the sole archaeological consultant for DOE-SRS. This report documents technical aspects of all prehistoric archaeological research conducted by the SRARP between 1973 and 1987. Further, this report provides interpretative contexts for archaeological resources as a basis for an archaeological resource plan reported elsewhere (SRARP 1989), and as a comprehensive statement of our current understanding of Native American prehistory. 400 refs., 130 figs., 39 tabs.

  12. Distribution and abundance of zooplankton at selected locations on the Savannah River and from tributaries of the Savannah River Plant: December 1984--August 1985

    SciTech Connect

    Chimney, M.J.; Cody, W.R.

    1986-11-01

    Spatial and temporal differences in the abundance and composition of the zooplankton community occurred at Savannah River and SRP creek/swamp sampling locations. Stations are grouped into four categories based on differences in community structure: Savannah River; thermally influenced stations on Four Mile Creek and Pen Branch; closed-canopy stations in the Steel Creek system; and open-canopy Steel Creek stations, non-thermally influenced stations on Pen Branch and Beaver Dam Creek. Differences among stations were little related to water temperature, dissolved oxygen concentration, conductivity or pH at the tine of collection. None of these parameters appeared to be limiting. Rather, past thermal history and habitat structure seemed to be important controlling factors. 66 refs.

  13. Environmental assessment for DOE permission for off-loading activities to support the movement of commercial low level nuclear waste across the Savannah River Site

    SciTech Connect

    1995-02-01

    This environmental assessment investigates the potential environmental and safety effects which could result from the land transport of low level radioactive wastes across the Savannah River Plant. Chem-Nuclear Systems operates a low level radioactive waste burial facility adjacent to the Savannah River Plant and is seeking permission from the DOE to transport the waste across Savannah River Plant.

  14. The Tritium Under-flow Study at the Savannah River Site

    SciTech Connect

    Hiergesell, Robert A.

    2008-01-15

    An issue of concern at the Savannah River Site (SRS) over the past 20 years is whether tritiated groundwater originating at SRS might be the cause of low levels of tritium measured in certain domestic wells in Georgia. Tritium activity levels in several domestic wells have been observed to occur at levels comparable to what is measured in rainfall in areas surrounding SRS. Since 1988, there has been speculation that tritiated groundwater from SRS could flow under the river and find its way into Georgia wells. A considerable effort was directed at assessing the likelihood of trans-river flow, and 44 wells have been drilled by the USGS and the Georgia Department of Natural Resources. Also, as part of the data collection and analysis, the USGS developed a numerical model during 1997-98 to assess the possibility for such trans-river flow to occur. The model represented the regional groundwater flow system surrounding the Savannah River Site (SRS) in seven layers corresponding to the underlying hydrostratigraphic units, which was regarded as sufficiently detailed to evaluate whether groundwater originating at SRS could possibly flow beneath the Savannah River into Georgia. The model was calibrated against a large database of water-level measurements obtained from wells on both sides of the Savannah River and screened in each of the hydrostratigraphic units represented within the model. The model results verified that the groundwater movement in all hydrostratigraphic units proceeds laterally toward the Savannah River from both South Carolina and Georgia, and discharges into the river. Once the model was calibrated, a particle-track analysis was conducted to delineate areas of potential trans-river flow. Trans-river flow can occur in either an eastward or westward direction. The model indicated that all locations of trans-river flow are restricted to the Savannah River's flood plain, where groundwater passes immediately prior to discharging into the river. Whether the

  15. Value engineering as applied at the Savannah River Site for environmental restoration projects

    SciTech Connect

    Kupar, J.J.; Morgenstern, M.R.; Richardson, J.E.

    1991-01-01

    Value Engineering (VE) has been defined as the organized study of functions which satisfy the user's needs at the lowest life cycle costs through applied creativity. VE was established in the World War II era when Mr. Lawrence Miles formed the concept of intentionally substituting materials to perform the function of more expensive standard materials. Since that time, VE has spread throughout the Department of Defense procurement agencies, and has in recent times been applied to almost every government agency. DOE Order 4040.1 states the policy to establish VE programs and use VE, where appropriate, to reduce nonessential costs and improve productivity for Departmental Elements. The order states that these VE programs shall, at a minimum, provide for the management and procurement practices as required by the OMB Circular A-131. Westinghouse Savannah River Company (WSRC), as the prime DOE contractor at the Savannah River Site (SRS), has adopted a policy of applying Value Engineering to all major projects with a Total Estimated Cost (TEC) of $10 million or greater. Projects of a lesser TEC may also have VE studies performed if management has determined that a significant potential exists for cost savings and/or cost avoidance. Within the Environmental Restoration (ER) Department, many of the groundwater remediation and waste site closure project represent individual projects that make up an overall SRS requirement to meet Federal RCRA or CERCLA clean up requirements. Many of these individual projects are not initially considered for VE studies because they never reach the $10 million TEC level. Because many remediation projects are duplicated throughout the site, there is a large potential for cross-link savings throughout the site.

  16. Value engineering as applied at the Savannah River Site for environmental restoration projects

    SciTech Connect

    Kupar, J.J.; Morgenstern, M.R.; Richardson, J.E.

    1991-12-31

    Value Engineering (VE) has been defined as the organized study of functions which satisfy the user`s needs at the lowest life cycle costs through applied creativity. VE was established in the World War II era when Mr. Lawrence Miles formed the concept of intentionally substituting materials to perform the function of more expensive standard materials. Since that time, VE has spread throughout the Department of Defense procurement agencies, and has in recent times been applied to almost every government agency. DOE Order 4040.1 states the policy to establish VE programs and use VE, where appropriate, to reduce nonessential costs and improve productivity for Departmental Elements. The order states that these VE programs shall, at a minimum, provide for the management and procurement practices as required by the OMB Circular A-131. Westinghouse Savannah River Company (WSRC), as the prime DOE contractor at the Savannah River Site (SRS), has adopted a policy of applying Value Engineering to all major projects with a Total Estimated Cost (TEC) of $10 million or greater. Projects of a lesser TEC may also have VE studies performed if management has determined that a significant potential exists for cost savings and/or cost avoidance. Within the Environmental Restoration (ER) Department, many of the groundwater remediation and waste site closure project represent individual projects that make up an overall SRS requirement to meet Federal RCRA or CERCLA clean up requirements. Many of these individual projects are not initially considered for VE studies because they never reach the $10 million TEC level. Because many remediation projects are duplicated throughout the site, there is a large potential for cross-link savings throughout the site.

  17. Rheology of Savannah River site tank 42 and tank 51 HLW radioactive sludges

    SciTech Connect

    Ha, B.C.; Bibler, N.E.

    1996-01-19

    Knowledge of the rheology of the radioactive sludge slurries at the Savannah River Site (SRS) is necessary in order to ensure that they can be retrieved from waste tanks and processed for final disposal. The high activity radioactive wastes stored as caustic slurries at SRS result from the neutralization of acid waste generated from production of nuclear defense materials. During storage, the wastes separate into a supernate layer and a sludge layer. In the Defense Waste Processing Facility (DWPF) at SRS, the radionuclides from the sludge and supernate will be immobilized into borosilicate glass for long term storage and eventual disposal. Before transferring the waste from a storage tank to the DWPF, a portion of the aluminum in the waste sludge will be dissolved and the sludge will be extensively washed to remove sodium. Tank 51 and Tank 42 radioactive sludges represent the first batch of HLW sludge to be processed in the DWPF. This paper presents results of rheology measurements of Tank 51 and Tank 42 at various solids concentrations. The rheologies of Tank 51 and Tank 42 radioactive slurries were measured remotely in the Shielded Cells Operations (SCO) at the Savannah River Technology Center (SRTC) using a modified Haake Rotovisco RV-12 with an M150 measuring drive unit and TI sensor system. Rheological properties of the Tank 51 and Tank 42 radioactive sludges were measured as a function of weight percent solids. The weight percent solids of Tank 42 sludge was 27, as received. Tank 51 sludge had already been washed. The weight percent solids were adjusted by dilution with water or by concentration through drying. At 12, 15, and 18 weight percent solids, the yield stresses of Tank 51 sludge were 5, 11, and 14 dynes/cm2, respectively. The apparent viscosities were 6, 10, and 12 centipoises at 300 sec-1 shear rate, respectively.

  18. AUTHORIZING THE DOT SPECIFICATION 6M PACKAGING FOR CONTINUED USE AT THE SAVANNAH RIVER SITE

    SciTech Connect

    Watkins, R.; Loftin, B.; Hoang, D.

    2010-03-04

    The U.S. Department of Transportation (DOT) Specification 6M packaging was in extensive use for more than 40 years for in-commerce shipments of Type B quantities of fissile and radioactive material (RAM) across the USA, among the Department of Energy (DOE) laboratories, and between facilities in the DOE production complex. In January 2004, the DOT Research and Special Programs Administration (RSPA) Agency issued a final rule in the Federal Register to ammend requirements in the Hazardous Materials Regulations (HMR) pertaining to the transportation of radioactive materials. The final rule became effective on October 1, 2004. One of those changes discontinued the use of the DOT specification 6M, along with other DOT specification packagings, on October 1, 2008. A main driver for the change was due to the fact that 6M specification packagings were not supported by a Safety Analysis Report for Packagings (SARP) that was compliant with Title 10 of the Code of Federal Regulations (CFR) Part 71 (10 CFR 71). The regulatory rules for the discontinued use have been edited in Title 49 of the CFR Parts 100-185, 2004 edition and thereafter. Prior to October 1, 2008, the use of the 6M within the boundaries of the Savannah River Site (SRS), called an onsite transfer, was governed by an onsite transportation document that referenced 49 CFR Parts 100-185. SRS had to develop an Onsite Safety Assessment (OSA) which was independent of 49 CFR in order to justify the continued use of the DOT Specification 6M for the transfer of radioactive material (RAM) at the SRS after October 1, 2008. This paper will discuss the methodology for and difficulties associated with authorizing the DOT Specification 6M Packaging for continued use at the Savannah River Site.

  19. Geochemical and physical properties of wetland soils at the Savannah River site

    SciTech Connect

    Dixon, K.L; Rogers, V.A.; Conner, S.P.; Cummings, C.L.; Gladden, J.B.; Weber, J.M.

    1996-05-01

    The Savannah River Site (SRS), located in Aiken, Allendale, and Barnwell Counties, South Carolina, is a nuclear production facility operated for the U.S. Department of Energy (DOE) by Westinghouse Savannah River Company (WSRC). To facilitate future human health and ecological risk assessments, treatability studies, remedial investigations, and feasibility studies for its wetland areas, SRS needs a database of background geochemical and physical properties of wetland soils. These data are needed for comparison to data collected from wetland soils that may have been affected by SRS operations. SRS contains 36,000 acres of wetlands and an additional 5,000 acres of bottom land soils subject to flooding. Recent studies of wetland soils near various waste units at SRS show that some wetlands have been impacted by releases of contaminants resulting from SRS operations (WSRC, 1992). Waste waters originating from the operations facilities typically have been discharged into seepage basins located in upland soils, direct discharge of waste water to wetland areas has been minimal. This suggests that impacted wetland areas have been affected indirectly as a result of transport mechanisms such as surface runoff, groundwater seeps, fluvial or sediment transport, and leaching. Looney et al. (1990) conducted a study to characterize the geochemical and physical properties of upland soils and shallow sediments on the SRS. A primary objective of the upland study was to collect the data needed to assess the qualitative and quantitative impacts of SRS operations on the environment. By comparing the upland soils data to data collected from waste units located in similar soils, SRS impacts could be assessed. The data were also intended to aid in selection of remediation alternatives. Because waste units at SRS have historically been located in upland areas, wetland soils were not sampled. (Abstract Truncated)

  20. Habitat preferences of foraging red-cockaded woodpeckers at the Savannah River Site, South Carolina.

    SciTech Connect

    Franzreb, Kathleen, E.

    2004-12-31

    Franzreb, Kathleen, E. 2004. Habitat preferences of foraging red-cockaded woodpeckers at the Savannah River Site, South Carolina. In: Red-cockaded woodpecker; Road to Recovery. Proceedings of the 4th Red-cockaded woodpecker Symposium. Ralph Costa and Susan J. Daniels, eds. Savannah, Georgia. January, 2003. Chapter 9. Habitat Management and Habitat Relationships. Pp 553-561. Abstract: I constructed a foraging study to examine habitat use of red-cockaded woodpeckers at the Savannah River Site, South Carolina. Because much of the land had been harvested in the late 1940s and early 1950s prior to being sold to the Department of Energy, the available habitat largely consisted of younger trees (e.g., less than 40 years old). From 1992 to 1995, I examined the foraging behavior and reproductive success of 7 groups of red-cockaded woodpeckers.

  1. Savannah River Cursory Surveys for E. I. du Pont de Nemours and Company, 1987

    SciTech Connect

    Not Available

    1988-07-18

    The 1987 cursory surveys of algae, insect and fish communities of the Savannah River in the vicinity of the Savannah River Plant (SRP) were a continuation of long-term biomonitoring studies conducted on the river since 1951. Since the initial series of biological surveys carried out prior to the start of SRP operations, the Academy has performed comprehensive surveys at regular intervals, supplemented by quarterly cursory surveys during those years comprehensive surveys are not performed. The 1987 algae and fish studies indicate no differences in water quality among stations, or in comparison with recent years, whereas the insect study found evidence of reduced water quality in 1987 at Station 1 above the SRP and an improvement in water quality overall in this reach of the river in recent years. 29 refs., 5 figs., 18 tabs.

  2. The Savannah River site`s groundwater monitoring program: second quarter 1997

    SciTech Connect

    Rogers, C.D.

    1997-11-01

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1997, EPD/EMS conducted extensive sampling of monitoring wells. A detailed explanation of the flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1997 are included in this report.

  3. 33 CFR 100.724 - Annual Augusta Invitational Rowing Regatta; Savannah River, Augusta, GA.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Annual Augusta Invitational Rowing Regatta; Savannah River, Augusta, GA. 100.724 Section 100.724 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY REGATTAS AND MARINE PARADES SAFETY OF LIFE ON...

  4. 33 CFR 100.724 - Annual Augusta Invitational Rowing Regatta; Savannah River, Augusta, GA.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Annual Augusta Invitational Rowing Regatta; Savannah River, Augusta, GA. 100.724 Section 100.724 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY REGATTAS AND MARINE PARADES SAFETY OF LIFE ON...

  5. ASSOCIATION OF LANDSCAPE METRICS TO SURFACE WATER BIOLOGY IN THE SAVANNAH RIVER BASIN

    EPA Science Inventory

    Surface water quality for the Savannah River basin was assessed using water biology and landscape metrics. Two multivariate analyses, partial least square and cannonical correlation, were used to describe how the structural variation in landscape variable(s) that contribute the ...

  6. The Savannah River Site`s Groundwater Monitoring Program 1991 well installation report

    SciTech Connect

    Not Available

    1992-06-01

    This report is a summary of the well and environmental soil boring information compiled for the groundwater monitoring program of the Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) at the Savannah River Site (SRS) during 1991. It includes discussion of environmental soil borings, surveying, well installations, abandonments, maintenance, and stabilization.

  7. Enhancement of the source term algorithm for emergency response at the Savannah River Site

    SciTech Connect

    Simpkins, A.A.; O`Kula, K.R.; Taylor, R.P.; Kearnaghan, G.P.

    1992-12-31

    The purpose of this work is to use the results of the Savannah River Site K-Reactor Probabilistic Safety Assessment to determine the accident sequences and source terms for beyond design basis accidents. Additionally, the methodology necessary to allow the Reactor Accident Program to incorporate this information is to be discussed.

  8. Enhancement of the source term algorithm for emergency response at the Savannah River Site

    SciTech Connect

    Simpkins, A.A.; O'Kula, K.R.; Taylor, R.P.; Kearnaghan, G.P.

    1992-01-01

    The purpose of this work is to use the results of the Savannah River Site K-Reactor Probabilistic Safety Assessment to determine the accident sequences and source terms for beyond design basis accidents. Additionally, the methodology necessary to allow the Reactor Accident Program to incorporate this information is to be discussed.

  9. Snakes of the Savannah River Plant with Information About Snakebite Prevention and Treatment.

    ERIC Educational Resources Information Center

    Gibbons, Whit

    This booklet is intended to provide information on the snakes of South Carolina, to point out the necessary steps to avoid a snakebite, and to indicate the current medical treatment for poisonous snakebite. It includes a checklist of South Carolina reptiles and a taxonomic key for the identification of snakes in the Savannah River Plant. Three…

  10. Fracture Toughness Properties of Savannah River Site Storage Tank ASTM A285 Low Carbon Steel

    SciTech Connect

    Subramanian, K.H.

    2002-05-22

    A materials test program was developed to measure mechanical properties of ASTM A285 Grade B low carbon steel for application to structural and flaw stability analysis of storage tanks at the Department of Energy (DOE) Savannah River Site (SRS). Under this plan, fracture toughness and tensile testing are being performed at conditions that are representative of storage tank

  11. SOURCES AND MIGRATION OF PLUTONIUM IN GROUNDWATER AT THE SAVANNAH RIVER SITE

    EPA Science Inventory

    We examined the isotopic composition, size distribution, and redox speciation of plutonium (Pu) in the groundwater of the F-area seepage basins at the US Department of Energy Savannah River Site (SRS). Sampling was designed to follow a groundwater plume downstream from the seepag...

  12. Savannah River Site Ingestion Pathway Methodology Manual for Airborne Radioactive Releases

    SciTech Connect

    Vincent, A.W. III

    2001-01-03

    This manual documents a recommended methodology for determining the ingestion pathway consequences of hypothetical accidental airborne radiological releases from facilities at the Savannah River Site. Both particulate and tritiated radioactive contaminants are addressed. Other approaches should be applied for evaluation of routine releases.

  13. Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan, Rev. 1

    SciTech Connect

    Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

    2001-12-10

    This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report.

  14. Emission Potentials and Capacities of Sediments along Lower Savannah River for Greenhouse Gases

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Emission of CH4 and other greenhouse gases (CO2, & N2O) is extremely variable in both space and time. It is well known fact that Savannah River receives effluents from variety of anthropogenic activities. These activities could have significant impact on the amount of available C and other chemical ...

  15. 75 FR 39007 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal...

  16. 77 FR 60688 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal...

  17. Facility siting as a decision process at the Savannah River Site

    SciTech Connect

    Wike, L.D.

    1995-12-31

    Site selection for new facilities at Savannah River Site (SRS) historically has been a process dependent only upon specific requirements of the facility. While this approach is normally well suited to engineering and operational concerns, it can have serious deficiencies in the modern era of regulatory oversight and compliance requirements. There are many issues related to the site selection for a facility that are not directly related to engineering or operational requirements; such environmental concerns can cause large schedule delays and budget impact,s thereby slowing or stopping the progress of a project. Some of the many concerns in locating a facility include: waste site avoidance, National Environmental Policy Act requirements, Clean Water Act, Clean Air Act, wetlands conservation, US Army Corps of Engineers considerations, US Fish and Wildlife Service statutes including threatened and endangered species issues, and State of South Carolina regulations, especially those of the Department of Health and Environmental Control. In addition, there are SRS restrictions on research areas set aside for National Environmental Research Park (NERP), Savannah River Ecology Laboratory, Savannah River Forest Station, University of South Carolina Institute of Archaeology and Anthropology, Southeastern Forest Experimental Station, and Savannah River Technology Center (SRTC) programs. As with facility operational needs, all of these siting considerations do not have equal importance. The purpose of this document is to review recent site selection exercises conducted for a variety of proposed facilities, develop the logic and basis for the methods employed, and standardize the process and terminology for future site selection efforts.

  18. Initial historic overview of the Savannah River Plant, Aiken and Barnwell Counties, South Carolina

    SciTech Connect

    Brooks, R.D.

    1980-01-01

    This historic overview begins with the initial European contacts in the southeastern United States. Specific information about the Savannah River Plant site is not available until circa 1750 when the first settlement of the area began. The overview becomes more specific as it advances chronologically toward the present. (ACR)

  19. 76 FR 65380 - Safety Zone; 2011 Head of the South Regatta, Savannah River, Augusta, GA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-21

    ... Head of the South Regatta, which will consist of a series of rowing races. The 2011 Head of the South... hazards associated with the event. ] Discussion of Rule On November 11 and 12, 2011, Augusta Rowing Club is hosting the 2011 Head of the South Regatta, a series of rowing races on the Savannah River...

  20. Mixed Waste Management Facility (MWMF) closure, Savannah River Plant: Clay cap test section construction report

    SciTech Connect

    Not Available

    1988-02-26

    This report contains appendices 3 through 6 for the Clay Cap Test Section Construction Report for the Mixed Waste Management Facility (MWMF) closure at the Savannah River Plant. The Clay Cap Test Program was conducted to evaluate the source, lab. permeability, in-situ permeability, and compaction characteristics, representative of kaolin clays from the Aiken, South Carolina vicinity. (KJD)

  1. The Savannah River Site`s Groundwater Monitoring Program. First quarter 1992

    SciTech Connect

    Not Available

    1992-08-03

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program`s activities; and serves as an official document of the analytical results.

  2. The Savannah River Site's Groundwater Monitoring Program second quarter 1999 (April through June 1999)

    SciTech Connect

    Hutchison, J.B.

    1999-12-16

    This report summarizes the Groundwater Monitoring Program conducted by Savannah River Site during first quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

  3. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1991

    SciTech Connect

    Not Available

    1992-02-17

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  4. The Savannah River Site`s groundwater monitoring program. First quarter 1991

    SciTech Connect

    Not Available

    1991-10-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results.

  5. The Savannah River Site's Groundwater Monitoring Program - Fourth Quarter 1999 (October through December 1999)

    SciTech Connect

    Hutchison, J.B.

    2000-10-12

    This report summarizes the Groundwater Monitoring Program conducted by the Savannah River site during fourth quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official records of the analytical results.

  6. The Savannah River Site's Groundwater Monitoring Program First Quarter 1999 (January through March 1999)

    SciTech Connect

    Hutchison, J.B.

    1999-12-08

    This report summarizes the Groundwater Monitoring Program conducted by Savannah River Site during first quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

  7. 78 FR 16260 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ...-Specific Advisory Board, Savannah River Site (78 FR 14088). This document makes a correction to that notice... Federal Register of March 4, 2013, in FR Doc. 2013-04875, on page 14088, please make the following... address is Hilton Garden Inn, 1065 Stevens Creek Road, Augusta, GA 30907. The reason for this change...

  8. 33 CFR 165.756 - Regulated Navigation Area; Savannah River, Georgia.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... escorted vessel. LNG tankship means a vessel as described in 46 CFR 154. Made-up means physically attached... (LNG) shall: (A) Comply with the notice requirements of 33 CFR part 160. The COTP may delay the vessel....756 Regulated Navigation Area; Savannah River, Georgia. (a) Regulated Navigation Area (RNA)....

  9. 33 CFR 165.756 - Regulated Navigation Area; Savannah River, Georgia.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Regulated Navigation Area; Savannah River, Georgia. 165.756 Section 165.756 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PORTS AND WATERWAYS SAFETY REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS Specific Regulated Navigation Areas...

  10. Radiological safety evaluation for a Savannah River Site Waste Transfer Facility. Revision 1

    SciTech Connect

    Ades, M.J.

    1994-01-01

    This paper describes a radiological safety evaluation performed in support of operation of a typical Waste Transfer Facility (WTF) located at the Savannah River Site (SRS). This facility transfers liquid radioactive waste from and to various waste processing, storage, and treatment facilities.

  11. Basement Surface Faulting and Topography for Savannah River Site and Vicinity

    SciTech Connect

    Cumbest, R.J.

    1998-12-17

    This report integrates the data from more than 60 basement borings and over 100 miles of seismic reflection profiling acquired on the Savannah River Site to map the topography of the basement (unweathered rock) surface and faulting recorded on this surface.

  12. Freshwater bivalve mollusca (unionidae, sphaeriidae, corbiculidae) of the Savannah River Plant, South Carolina

    SciTech Connect

    Britton, J.C.; Fuller, S.L.H.

    1980-11-01

    A guide to freshwater bivalve molluscs found at the Savannah River Plant is presented. A dichotomous taxonomic key is provided to common forms and to unreported species whose geographic distributions include nearby localities. Discussions of ecology, life history, larval hosts, and other pertinent information is provided. (ACR)

  13. Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan

    SciTech Connect

    Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

    2001-10-31

    This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report

  14. Finishing Strong in 2011: The Recovery Act at Work at Savannah River Site

    ScienceCinema

    None

    2012-06-14

    American Recovery and Reinvestment Act's highlights and accomplishments for 2011 projects. Covers the latest technology and robotics used for waste management. This video is an overview of the success ARRA brought to the Savannah River Site, the environment, the econonmy, and the surrounding communities.

  15. Breeding bird populations and habitat associations within the Savannah River Site (SRS).

    SciTech Connect

    Gauthreaux, Sidney, A.; Steven J. Wagner.

    2005-06-29

    Gauthreaux, Sidney, A., and Steven J. Wagner. 2005. Breeding bird populations and habitat associations within the Savannah River Site (SRS). Final Report. USDA Forest Service, Savannah River, Aiken, SC. 48 pp. Abstract: During the 1970's and 1980's a dramatic decline occurred in the populations of Neotropical migratory birds, species that breed in North America and winter south of the border in Central and South America and in the Caribbean. In 1991 an international initiative was mounted by U. S. governmental land management agencies, nongovernmental conservation agencies, and the academic and lay ornithological communities to understand the decline of Neotropical migratory birds in the Americas. In cooperation with the USDA Forest Service - Savannah River (FS - SR) we began 1992 a project directed to monitoring population densities of breeding birds using the Breeding Bird Census (BBC) methodology in selected habitats within the Savannah River Site SRS. In addition we related point count data on the occurrence of breeding Neotropical migrants and other bird species to the habitat data gathered by the Forest Inventory and Analysis (FIA) program of the USDA Forest Service and data on habitat treatments within forest stands.

  16. The Savannah River Site's Groundwater Monitoring Program First Quarter 1998 (January through March 1998)

    SciTech Connect

    Hutchison, J.B.

    1999-05-26

    This report summarizes the Groundwater Monitoring Program conducted by the Savannah River Site during first quarter 1998. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

  17. The Savannah River Site's Groundwater Monitoring Program - Third Quarter 1999 (July through September 1999)

    SciTech Connect

    Hutchison, J.B.

    2000-09-05

    This report summarizes the Savannah River Site Groundwater Monitoring Program during the third quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program activities; and serves as an official record of the analytical results.

  18. 78 FR 716 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal...

  19. Savannah River Ecology Laboratory annual technical progress report of ecological research, period ending July 31, 1993

    SciTech Connect

    Vaitkus, M.R.; Wein, G.R.; Johnson, G.

    1993-11-01

    This progress report gives an overview of research programs at the Savannah River Site. Topics include; environmental operations support, wood stork foraging and breeding, defense waste processing, environmental stresses, alterations in the environment due to pollutants, wetland ecology, biodiversity, pond drawdown studies, and environmental toxicology.

  20. Finishing Strong in 2011: The Recovery Act at Work at Savannah River Site

    SciTech Connect

    2011-01-01

    American Recovery and Reinvestment Act's highlights and accomplishments for 2011 projects. Covers the latest technology and robotics used for waste management. This video is an overview of the success ARRA brought to the Savannah River Site, the environment, the econonmy, and the surrounding communities.