Science.gov

Sample records for source upgrade project

  1. Advanced Photon Source Upgrade Project - Materials

    SciTech Connect

    Gibbson, Murray

    2011-01-01

    An upgrade to Advanced Photon Source announced by DOE - http://go.usa.gov/ivZ -- will help scientists break through bottlenecks in materials design in order to develop materials with desirable functions.

  2. Advanced Photon Source Upgrade Project - Materials

    ScienceCinema

    Gibbson, Murray;

    2013-04-19

    An upgrade to Advanced Photon Source announced by DOE - http://go.usa.gov/ivZ -- will help scientists break through bottlenecks in materials design in order to develop materials with desirable functions.

  3. Cyclotron Institute Upgrade Project

    SciTech Connect

    Clark, Henry; Yennello, Sherry; Tribble, Robert

    2014-08-26

    The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

  4. The Bevalac Upgrade Project

    SciTech Connect

    Alonso, J.R.; Dwinell, R.D.; Feinberg, B.; Frias, R.; Gough, R.A.; Howard, D.R.; Hunt, D.B.; Krebs, G.F.; Krupnick, J.T.; Lewis, S.A.

    1987-03-01

    This paper describes a proposed upgrade of the Bevalac accelerator complex in which the present Bevatron is replaced with a modern, strong-focusing 17 T-m synchrotron. This new ring is designed to accelerate all ions throughout the periodic table with intensities 100 to 1000 times higher than the present Bevatron. It will also provide a substantially improved beam spill structure and will reduce operating costs. A fast extraction capability can be used to inject a future heavy ion storage ring. Pulse-to-pulse switching of energy and ion species is an important goal. The existing injectors, shielding, experimental facilities and utilities of the present Bevalac will remain substantially intact.

  5. An All-Permanent Magnet ECR Ion Source for the ORNL MIRF Upgrade Project

    SciTech Connect

    Hitz, D.; Girard, A.; Guillemet, L.; Mathonnet, J.M.; Chartier, J.; Delaunay, M.; Meyer, F.W.

    2005-03-15

    A new high voltage platform has been installed at the ORNL Multicharged Ion Research Facility (MIRF) to extend the energy range of multicharged ions available for experiments studying their collisional interactions with electrons, atoms, molecules, and solid surfaces. For the production of the multiply charged ions, a new all-permanent magnet ECRIS has been designed and fabricated at CEA/Grenoble. After a brief overview of the basic features of the new platform, and associated beam transport detailed description of the new ion source design and performance is provided, together with some typical Ar, Xe, and O beam intensities obtained during source commissioning prior to shipment to ORNL.

  6. Project W-420 stack monitoring system upgrades

    SciTech Connect

    CARPENTER, K.E.

    1999-02-25

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420.

  7. Superbend upgrade of the Advanced Light Source

    SciTech Connect

    Robin, D.; Krupnick, J.; Schlueter, R.; Steier, C.; Marks, S.; Wang, B.; Zbasnik, J.; Benjegerdes, R.; Biocca, A.; Bish, P.; Brown, W.; Byrne, W.; Chen, J.; Decking, W.; DeVries, J.; DeMarco, W.R.; Fahmie, M.; Geyer, A.; Harkins, J.; Henderson, T.; Hinkson, J.; Hoyer, E.; Hull, D.; Jacobson, S.; McDonald, J.; Molinari, P.; Mueller, R.; Nadolski, L.; Nishimura, H.; Nishimura, K.; Ottens, F.; Paterson, J.A.; Pipersky, P.; Portmann, G.; Richie, A.; Rossi, S.; Salvant, B.; Scarvie, T.; Schmidt,A.; Spring, J.; Taylor, C.; Thur, W.; Timossi, C.; Wandesforde, A.

    2004-05-26

    The Advanced Light Source (ALS) is a third generation synchrotron light source located at Lawrence Berkeley National Laboratory (LBNL). There was an increasing demand at the ALS for additional high brightness hard x-ray beamlines in the 7 to 40 keV range. In response to that demand, the ALS storage ring was modified in August 2001. Three 1.3 Tesla normal conducting bending magnets were removed and replaced with three 5 Tesla superconducting magnets (Superbends). The radiation produced by these Superbends is an order of magnitude higher in photon brightness and flux at 12 keV than that of the 1.3 Tesla bends, making them excellent sources of hard x-rays for protein crystallography and other hard x-ray applications. At the same time the Superbends did not compromise the performance of the facility in the VUV and soft x-ray regions of the spectrum. The Superbends will eventually feed 12 new beamlines greatly enhancing the facility's capability and capacity in the hard x-ray region. The Superbend project is the biggest upgrade to the ALS storage ring since it was commissioned in 1993. In this paper we present an overview of the Superbend project, its challenges and the resulting impact on the ALS.

  8. An Upgrade for the Advanced Light Source

    SciTech Connect

    Chemla, Daniel S.; Feinberg, Benedict; Hussain, Zahid; Kirz, Janos; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

    2004-09-01

    One of the first third-generation synchrotron light sources, the ALS, has been operating for almost a decade at Berkeley Lab, where experimenters have been exploiting its high brightness for forefront science. However, accelerator and insertion-device technology have significantly changed since the ALS was designed. As a result, the performance of the ALS is in danger of being eclipsed by that of newer, more advanced sources. The ALS upgrade that we are planning includes full-energy, top-off injection with higher storage-ring current and the replacement of five first-generation insertion devices with nine state-of-the art insertion devices and four new application-specific beamlines now being identified in a strategic planning process. The upgrade will help keep the ALS at the forefront of soft x-ray synchrotron light sources for the next two decades.

  9. Plans for an Upgrade of the Advanced Photon Source

    NASA Astrophysics Data System (ADS)

    Mills, Dennis; APS-U Project Team

    2011-03-01

    We are presently developing plans for an upgrade of the Advanced Photon Source facility. Science has formally issued Critical Decision 0 and approved the Mission Need Statement in April of 2010, authorizing the APS to develop a conceptual design for the APS Upgrade (APS-U) project. The proposed upgrade will include enhancements to the accelerator, beamlines, and facility infrastructure. The high brilliance x-ray beams at high photon energy (e.g. > 25 keV) provided by the APS Upgrade will have strong impact on research in energy, the environment, new or improved materials, and biological studies. High-energy x-rays can penetrate into a wide range of realistic and/or extreme environments and allow imaging of structures and processes in unprecedented detail on picosecond time scales and nanometer length scales. The presentation will include some of the essential goals of the APS-U and proposed strategies to attain those goals. The Advanced Photon Source at Argonne National Laboratory is supported by the U. S. Department of Energy, Office of Science, Office of Basic Energy Sciences, under Contract No. DE-AC02-06CH11357.

  10. Progress in the AGS upgrade projects

    SciTech Connect

    Sluyters, T.J.

    1989-01-01

    The objectives of the AGS Upgrade Project are to prepare the AGS for Booster injection with an increase in the proton intensity to 6 {times} 10{sup 13} particles per pulse for a new generation of experiments on rare K decay, neutrino physics, the (g-2) value of the muon, and many other areas; to increase polarized proton intensity to 10{sup 12} particles per pulse for multi-target spin physics; to accelerate heavy ions up to Au for heavy ion physics; and, of course, to improve the flexibility and reliability of the AGS. High priority has been given to those projects which will reduce, at an early stage, beam losses during injection and acceleration, such as a fast electrostatic beam chopper and a high frequency dilution cavity. Other upgrade programs in progress are: a vacuum overhaul to reduce the AGS operating pressure by a factor of 100; an upgrade of the low and high field magnet correction system; automation of the Siemens main magnet power supply, etc. 3 refs., 2 figs.

  11. CDF End Plug calorimeter Upgrade Project

    SciTech Connect

    Apollinari, G.; de Barbaro, P.; Mishina, M.

    1994-01-01

    We report on the status of the CDF End Plug Upgrade Project. In this project, the CDF calorimeters in the end plug and the forward regions will be replaced by a single scintillator based calorimeter. After an extensive R&D effort on the tile/fiber calorimetry, we have now advanced to a construction phase. We review the results of the R&D leading to the final design of the calorimeters and the development of tooling devised for this project. The quality control program of the production of the electromagnetic and hadronic calorimeters is described. A shower maximum detector for the measurement of the shower centroid and the shower profile of electrons, {gamma} and {pi}{sup 0} has been designed. Its performance requirements, R&D results and mechanical design are discussed.

  12. Results with the electron cyclotron resonance charge breeder for the {sup 252}Cf fission source project (Californium Rare Ion Breeder Upgrade) at Argonne Tandem Linac Accelerator System

    SciTech Connect

    Vondrasek, R.; Kondrashev, S.; Pardo, R.; Scott, R.; Zinkann, G. P.

    2010-02-15

    The construction of the Californium Rare Ion Breeder Upgrade, a new radioactive beam facility for the Argonne Tandem Linac Accelerator System (ATLAS), is nearing completion. The facility will use fission fragments from a 1 Ci {sup 252}Cf source; thermalized and collected into a low-energy particle beam by a helium gas catcher. In order to reaccelerate these beams, an existing ATLAS electron cyclotron resonance (ECR) ion source was redesigned to function as an ECR charge breeder. Thus far, the charge breeder has been tested with stable beams of rubidium and cesium achieving charge breeding efficiencies of 9.7% into {sup 85}Rb{sup 17+} and 2.9% into {sup 133}Cs{sup 20+}.

  13. Spallation Neutron Source Operating Experience and Outlook for Upgrades

    NASA Astrophysics Data System (ADS)

    Henderson, Stuart

    2010-03-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory is a MW-class accelerator-driven pulsed neutron source. The SNS began formal operations in October 2006. Since then, the beam power has been increased to 1 MW, the number of operating hours per year has increased to nearly 5000, the availability has increased to 85%, and the number of operating neutron scattering instruments has increased to 13. Plans are in place to increase the beam power and availability to their design values of 1.4 MW and 90% over the next two years, and to continue the build-out of instruments to 16 by 2012. Two upgrade projects are in the planning stages. In the first, the beam power of the SNS is increased to at least 2 MW by raising the beam energy from 1.0 to 1.3 GeV and the beam current by 60%. In the second, a Second Target Station is constructed, and is powered by sharing beam pulses with the first target station. The operating experience will be described, as will the challenges that have been met along the path toward 1 MW beam power. The strategy for upgrades will also be presented.

  14. Syracuse Upgrading Project-December 1967--June 1970.

    ERIC Educational Resources Information Center

    Syracuse Univ. Research Corp., NY.

    The document reports on a training program designed to accelerate in-plant upgrading of skills, first in metal-working, then in health-service occupations, through training provided in off-work time. The project was to evaluate the use of allowances as incentives, and to provide guidelines for future upgrading programs. (Author)

  15. RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE

    SciTech Connect

    Tran, Paul

    2013-02-28

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  16. Status of the Ultracold neutron source upgrade at LANSCE

    SciTech Connect

    Pattie, Robert Wayne Jr.

    2015-10-31

    Several slides show the source and flux of ultracold neutrons produced. In summary, an upgraded UCN source has been designed, and parts are currently being fabricated. Nickel phosphorus-coated guides will improve transport to the experiment hall. The source will be installed in the spring of 2016 and commissioned in the fall of 2016.

  17. Project W-420 Stack Monitoring system upgrades conceptual design report

    SciTech Connect

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  18. Modular Filter and Source-Management Upgrade of RADAC

    NASA Technical Reports Server (NTRS)

    Lanzi, R. James; Smith, Donna C.

    2007-01-01

    In an upgrade of the Range Data Acquisition Computer (RADAC) software, a modular software object library was developed to implement required functionality for filtering of flight-vehicle-tracking data and management of tracking-data sources. (The RADAC software is used to process flight-vehicle metric data for realtime display in the Wallops Flight Facility Range Control Center and Mobile Control Center.)

  19. Students Upgrading Mathematical Achievement Project SUMA--1989. Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Barrera, Marbella

    Students Upgrading Mathematical Achievement (SUMA) is a part of the Bilingual Mathematics and Science Achievement project for Spanish-speaking Limited English Proficient (LEP) students. Its objective is to provide both remedial tutoring to students lacking mathematics skills and enrichment to students who are potentially gifted in mathematics.…

  20. Diagnostic Systems Plan for the Advanced Light Source Top-OffUpgrade

    SciTech Connect

    Barry, Walter; Chin, Mike; Robin, David; Sannibale, Fernando; Scarvie, Tom; Steier, Christoph

    2005-05-10

    The Advanced Light Source (ALS) will soon be upgraded to enable top-off operations [1], in which electrons are quasi-continuously injected to produce constant stored beam current. The upgrade is structured in two phases. First, we will upgrade our injector from 1.5 GeV to 1.9 GeV to allow full energy injection and will start top-off operations. In the second phase, we will upgrade the Booster Ring (BR) with a bunch cleaning system to allow high bunch purity top-off injection. A diagnostics upgrade will be crucial for success in both phases of the top-off project, and our plan for it is described in this paper. New booster ring diagnostics will include updated beam position monitor (BPM) electronics, a tune monitoring system, and a new scraper. Two new synchrotron light monitors and a beam stop will be added to the booster-to-storage ring transfer line (BTS), and all the existing beam current monitors along the accelerator chain will be integrated into a single injection efficiency monitoring application. A dedicated bunch purity monitor will be installed in the storage ring (SR). Together, these diagnostic upgrades will enable smooth commissioning of the full energy injector and a quick transition to high quality top-off operation at the ALS.

  1. Status of the ATF Damping Ring BPM Upgrade Project

    SciTech Connect

    Briegel, C.; Eddy, N.; Haynes, B.; May, J.; McCormick, D.; Nelson, J.; Nicklaus, D.; Prieto, P.; Rechenmacher, R.; Smith, T.; Teranuma, N.; Urakawa, J.; Voy, D.; Wendt, M.; Woodley, M.; /SLAC

    2011-12-01

    A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it's finalization are presented.

  2. The Materials Science beamline upgrade at the Swiss Light Source.

    PubMed

    Willmott, P R; Meister, D; Leake, S J; Lange, M; Bergamaschi, A; Böge, M; Calvi, M; Cancellieri, C; Casati, N; Cervellino, A; Chen, Q; David, C; Flechsig, U; Gozzo, F; Henrich, B; Jäggi-Spielmann, S; Jakob, B; Kalichava, I; Karvinen, P; Krempasky, J; Lüdeke, A; Lüscher, R; Maag, S; Quitmann, C; Reinle-Schmitt, M L; Schmidt, T; Schmitt, B; Streun, A; Vartiainen, I; Vitins, M; Wang, X; Wullschleger, R

    2013-09-01

    The Materials Science beamline at the Swiss Light Source has been operational since 2001. In late 2010, the original wiggler source was replaced with a novel insertion device, which allows unprecedented access to high photon energies from an undulator installed in a medium-energy storage ring. In order to best exploit the increased brilliance of this new source, the entire front-end and optics had to be redesigned. In this work, the upgrade of the beamline is described in detail. The tone is didactic, from which it is hoped the reader can adapt the concepts and ideas to his or her needs. PMID:23955029

  3. The Materials Science beamline upgrade at the Swiss Light Source

    PubMed Central

    Willmott, P. R.; Meister, D.; Leake, S. J.; Lange, M.; Bergamaschi, A.; Böge, M.; Calvi, M.; Cancellieri, C.; Casati, N.; Cervellino, A.; Chen, Q.; David, C.; Flechsig, U.; Gozzo, F.; Henrich, B.; Jäggi-Spielmann, S.; Jakob, B.; Kalichava, I.; Karvinen, P.; Krempasky, J.; Lüdeke, A.; Lüscher, R.; Maag, S.; Quitmann, C.; Reinle-Schmitt, M. L.; Schmidt, T.; Schmitt, B.; Streun, A.; Vartiainen, I.; Vitins, M.; Wang, X.; Wullschleger, R.

    2013-01-01

    The Materials Science beamline at the Swiss Light Source has been operational since 2001. In late 2010, the original wiggler source was replaced with a novel insertion device, which allows unprecedented access to high photon energies from an undulator installed in a medium-energy storage ring. In order to best exploit the increased brilliance of this new source, the entire front-end and optics had to be redesigned. In this work, the upgrade of the beamline is described in detail. The tone is didactic, from which it is hoped the reader can adapt the concepts and ideas to his or her needs. PMID:23955029

  4. Linear Coherent Light Source, LCLS: The upgrade path

    NASA Astrophysics Data System (ADS)

    Bergmann, Uwe

    2014-03-01

    With ultrashort and ultrabright X-ray pulses (>1012 photons in pulses of < 100 femtosecond length) X-ray Free electron lasers provide revolutionary new capabilities to study a wide range of phenomena including novel states of matter, quantum materials, ultrafast chemistry and structural biology. Starting operations in 2009 the Linac Coherent Light Source (LCLS) at SLAC has been the first of such machines delivering 280 eV-11 keV X-ray pulses to users at a rate of 120 Hz. The success of the LCLS has positively impacted numerous efforts around the world and there are now five hard X-ray FELs in operation or under construction in addition to two FELs that operate in the VUV and soft X-ray region. The planned LCLS upgrade, LCLS-II, has recently been modified in order to address the recommendation of a report of the Basic Energy Science Advisory Committee from last summer. We will present examples of some of the most exciting LCLS science highlights, discuss operation upgrades and present the parameters of the new LCLS-II upgrade.

  5. Upgrade of the BATMAN test facility for H- source development

    NASA Astrophysics Data System (ADS)

    Heinemann, B.; Fröschle, M.; Falter, H.-D.; Fantz, U.; Franzen, P.; Kraus, W.; Nocentini, R.; Riedl, R.; Ruf, B.

    2015-04-01

    The development of a radio frequency (RF) driven source for negative hydrogen ions for the neutral beam heating devices of fusion experiments has been successfully carried out at IPP since 1996 on the test facility BATMAN. The required ITER parameters have been achieved with the prototype source consisting of a cylindrical driver on the back side of a racetrack like expansion chamber. The extraction system, called "Large Area Grid" (LAG) was derived from a positive ion accelerator from ASDEX Upgrade (AUG) using its aperture size (ø 8 mm) and pattern but replacing the first two electrodes and masking down the extraction area to 70 cm2. BATMAN is a well diagnosed and highly flexible test facility which will be kept operational in parallel to the half size ITER source test facility ELISE for further developments to improve the RF efficiency and the beam properties. It is therefore planned to upgrade BATMAN with a new ITER-like grid system (ILG) representing almost one ITER beamlet group, namely 5 × 14 apertures (ø 14 mm). Additionally to the standard three grid extraction system a repeller electrode upstream of the grounded grid can optionally be installed which is positively charged against it by 2 kV. This is designated to affect the onset of the space charge compensation downstream of the grounded grid and to reduce the backstreaming of positive ions from the drift space backwards into the ion source. For magnetic filter field studies a plasma grid current up to 3 kA will be available as well as permanent magnets embedded into a diagnostic flange or in an external magnet frame. Furthermore different source vessels and source configurations are under discussion for BATMAN, e.g. using the AUG type racetrack RF source as driver instead of the circular one or modifying the expansion chamber for a more flexible position of the external magnet frame.

  6. Global Orbit Feedback System Upgrade At The Canadian Light Source

    NASA Astrophysics Data System (ADS)

    Hu, Song; Payne, Chris; Chabot, Daron; Maxwell, Dylan; Dallin, Les

    2013-03-01

    The Canadian Light Source has been using a Matlab application called CLSORB to perform slow orbit correction in the storage ring. A fast global orbit feedback system is recently deployed to replace the old system. The correction rate is about 45 Hz and all the corrections are calculated and applied by an RTEMS IOC. This upgrade has resulted in increased beam stability and reduced perturbations caused by the ramping of superconducting wigglers. This paper will discuss the implementation and performance of the fast orbit correction system.

  7. Upgrade of the inverted source of polarized electrons at ELSA

    NASA Astrophysics Data System (ADS)

    Heiliger, D.; Hillert, W.; Neff, B.

    2011-05-01

    Since 2000 an inverted source of polarized electrons at the electron stretcher accelerator ELSA routinely provides a pulsed beam with a polarization degree of about 80%. One micro-second long pulses with 100 nC charge are produced by irradiating a strained-layer superlattice photocathode with laser light from a flashlamp-pumped Ti:Sa laser. A rectangular pulse shape is achieved by operating the source in space charge limitation. The proposed hadron physics program requires an intensity upgrade to 200 mA which can be achieved by enlarging the emission area or by improving the quantum efficiency (QE). The resulting changes of the beam parameters (like emittance and space charge) and of the optics of the transfer line were investigated in numerical simulations. In order to enhance the source performance a new load lock system with crystal storage and atomic hydrogen cleaning will be installed in the near future.

  8. The Upgrade of the Neutron Induced Positron Source NEPOMUC

    NASA Astrophysics Data System (ADS)

    Hugenschmidt, C.; Ceeh, H.; Gigl, T.; Lippert, F.; Piochacz, C.; Pikart, P.; Reiner, M.; Weber, J.; Zimnik, S.

    2013-06-01

    In summer 2012, the new NEutron induced POsitron Source MUniCh (NEPOMUC) was installed and put into operation at the research reactor FRM II. At NEPOMUC upgrade 80% 113Cd enriched Cd is used as neutron-gamma converter in order to ensure an operation time of 25 years. A structure of Pt foils inside the beam tube generates positrons by pair production. Moderated positrons leaving the Pt front foil are electrically extracted and magnetically guided to the outside of the reactor pool. The whole design, including Pt-foils, the electric lenses and the magnetic fields, has been improved in order to enhance both the intensity and the brightness of the positron beam. After adjusting the potentials and the magnetic guide and compensation fields an intensity of about 3·109 moderated positrons per second is expected. During the first start-up, the measured temperatures of about 90°C ensure a reliable operation of the positron source. Within this contribution the features and the status of NEPOMUC upgrade are elucidated. In addition, an overview of recent positron beam experiments and current developments at the spectrometers is given.

  9. A new ATLAS efficiency and intensity upgrade project.

    SciTech Connect

    Ostroumov, P. N.; Fuerst, J. D.; Kelly, M. P.; Mustapha, B.; Shepard, K. W.; Xu, J.; Physics

    2009-01-01

    The ATLAS facility provides beams of essentially all stable isotopes at energies above the Coulomb barrier for nuclear physics research. We have developed a two-stage ATLAS upgrade plan which includes the replacement of aging split-ring cavities by high-performance quarter-wave resonators (QWR) capable of accelerating {approx}100 p{mu}A ion beams. The first stage of the upgrade project funded through the American Recovery and Reinvestment Act includes accelerator efficiency increase by adding a new RFQ injector, development and construction of a new cryomodule containing up to 3 SC solenoids and 8 QWRs. A new 72.75 MHz resonator is designed for an optimum ion velocity {beta} = 0.075. To achieve record high accelerating voltage {approx}2.5 MV at this very low velocity range, EM properties of the resonator are highly optimized to reduce peak surface fields. The resonator will be equipped with a piezoelectric fast tuner and capacitive coupler to transmit several kilowatts of RF power. The vast experience gained during the development, commissioning and operation of the ATLAS energy upgrade cryomodule [1] will be applied for the design of the new cryomodule.

  10. Idaho National Engineering Laboratory Sewer System Upgrade Project. Environmental Assessment

    SciTech Connect

    Not Available

    1994-04-01

    The Department of Energy (DOE) has prepared an environmental assessment for a proposed Sewer System Upgrade Project at the Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho. The proposed action would include activities conducted at the Central Facilities Area, Test Reactor Area, and the Containment Test Facility at the Test Area North at INEL. The proposed action would consist of replacing or remodeling the existing sewage treatment plants at the Central Facilities Area, Test Reactor Area, and Containment Test Facility. Also, a new sewage testing laboratory would be constructed at the Central Facilities Area. Finally, the proposed action would include replacing, repairing, and/or adding sewer lines in areas where needed.

  11. 12 GeV Upgrade Project - Cryomodule Production

    SciTech Connect

    J. Hogan, A. Burrill, G.K. Davis, M.A. Drury, M. Wiseman

    2012-07-01

    The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

  12. The timing upgrade project of the TOTEM Roman Pots detectors

    NASA Astrophysics Data System (ADS)

    Berretti, M.

    2016-07-01

    We describe the upgrade project developed by the TOTEM Collaboration to measure the time of flight (TOF) of the protons in the vertical Roman Pot detectors. The physics program that the upgraded system aims to accomplish will be addressed. Simulation studies allowed us to define a geometry of the sensor such that the detection inefficiency due to the pile-up of the particles in the same electrode is low even with a small amount of read-out channels. The measurement of the protons TOF with ~ 50 ps time resolution requires the development of several challenging technological solutions. The arrival time of the protons will be measured by scCVD diamond detectors, for which a dedicated fast and low-noise electronics for the signal amplification has been designed. Indeed, while diamond sensors have the advantage of higher radiation hardness, lower noise and faster signal than silicon sensors, the amount of charge released in the medium is lower. The sampling of the waveform is performed at a rate up to 10 GS/s with the SAMPIC chip. The sampled waveforms are then analysed offline where optimal algorithms can be implemented to reduce the time walk effects. The clock distribution system, based on the Universal Picosecond Timing System developed at GSI, is optimized in order to have a negligible uncertainty on the TOF measurement. Finally an overview of the control system which will interface the timing detectors to the experiment DAQ is given.

  13. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect

    Field, S. M.

    2007-04-01

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  14. Tank farm restoration and safe operation, project W-314, upgrade scope summary report (USSR)

    SciTech Connect

    Jacobson, R.W.

    1997-04-01

    This revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from Alternative Generation Analysis (AGA), customer guidance, and changing requirements. It defines the actual upgrades currently in scope, and provides traceability to the requirements and/or drivers.

  15. A transverse bunch by bunch feedback system for Pohang Light Source upgrade

    SciTech Connect

    Lee, E.-H.; Kim, D.-T.; Huang, J.-Y.; Shin, S.; Nakamura, T.; Kobayashi, K.

    2014-12-15

    The Pohang Light Source upgrade (PLS-II) project has successfully upgraded the Pohang Light Source (PLS). The main goals of the PLS-II project are to increase the beam energy to 3 GeV, increase the number of insertion devices by a factor of two (20 IDs), increase the beam current to 400 mA, and at the same time reduce the beam emittance to below 10 nm by using the existing PLS tunnel and injection system. Among 20 insertion devices, 10 narrow gap in-vacuum undulators are in operation now and two more in-vacuum undulators are to be installed later. Since these narrow gap in-vacuum undulators are most likely to produce coupled bunch instability by the resistive wall impedance and limit the stored beam current, a bunch by bunch feedback system is implemented to suppress coupled bunch instability in the PLS-II. This paper describes the scheme and performance of the PLS-II bunch by bunch feedback system.

  16. Progress of projection computed tomography by upgrading of the beamline 37XU of SPring-8

    NASA Astrophysics Data System (ADS)

    Terada, Yasuko; Suzuki, Yoshio; Uesugi, Kentaro; Miura, Keiko

    2016-01-01

    Beamline 37XU at SPring-8 has been upgraded for nano-focusing applications. The length of the beamline has been extended to 80 m. By utilizing this length, the beamline has advantages for experiments such as X-ray focusing, X-ray microscopic imaging and X-ray computed tomography. Projection computed tomography measurements were carried out at experimental hutch 3 located 80 m from the light source. CT images of a microcapsule have been successfully obtained with a wide X-ray energy range.

  17. PHOTOINJECTED ENERGY RECOVERY LINAC UPGRADE FOR THE NATIONAL SYNCHROTRON LIGHT SOURCE.

    SciTech Connect

    BEN-ZVI,I.; BABZIEN,M.; BLUM,E.; CASEY,W.; CHANG,X.; GRAVES,W.; HASTINGS,J.; HULBERT,S.; JOHNSON,E.; KAO,C.C.; KRAMER,S.; KRINSKY,S.; MORTAZAVI,P.; MURPHY,J.; OZAKI,S.; PJEROV,S.; PODOBEDOV,B.; RAKOWSKY,G.; ROSE,J.; SHAFTAN,T.; SHEEHY,B.; SIDDONS,D.; SMEDLEY,J.; SRINIVASAN-RAO,T.; TOWNE,N.; WANG,J.M.; WANG,X.; WU,J.; YAKIMENKO,V.; YU,L.H.

    2001-06-18

    We describe a major paradigm shift in the approach to the production of synchrotron radiation This change will considerably improve the scientific capabilities of synchrotron light sources. We introduce plans for an upgrade of the National Synchrotron Light Source (NSLS). This upgrade will be based on the Photoinjected Energy Recovering Linac (PERL). This machine emerges from the union of two technologies, the laser-photocathode RF gun (photoinjector) and superconducting linear accelerators with beam energy recovery (Energy Recovering Linac). The upgrade will bring the NSLS users many new insertion device beam lines, brightness greater than 3rd generation lightsource's and ultra-short pulse capabilities, not possible with storage ring light sources.

  18. Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use

    SciTech Connect

    HAMMERS, J.S.

    1999-07-21

    This report identifies the responsibilities and requirements, applicable to the 241-AN-A Valve Pit Upgrades portion of Project W-314, for Acceptance for Beneficial Use in accordance with HNF-IP-0842, Vol IV, Sec 3.12. At project turnover, the end user accepts the affected Structures, Systems, and Components (SSCs) for beneficial use. This checklist is used to help the end user ensure that all documentation, training, and testing requirements are met prior to turnover. This checklist specifically identifies those items related to the upgrading of the 241-AN-A valve pit. The upgrades include: the installation of jumper/valve manifolds with position sensors, replacement pit leak detection systems, construction of replacement cover blocks, and electrical upgrades to support the instrumentation upgrades.

  19. Project W-314 241-AN-B valve pit upgrade acceptance for beneficial use

    SciTech Connect

    HAMMERS, J.S.

    1999-07-21

    This report identifies the responsibilities and requirements, applicable to the 241-AN-B Valve Pit Upgrades portion of Project W-314, for Acceptance for Beneficial Use in accordance with HNF-IP-0842, Vol IV, Sec 3.12. At project turnover, the end user accepts the affected Structures, Systems, and Components (SSCs) for beneficial use. This checklist is used to help the end user ensure that all documentation, training, and testing requirements are met prior to turnover. This checklist specifically identifies those items related to the upgrading of the 241-AN-B valve pit. The upgrades include: the installation of jumper/valve manifolds with position sensors, replacement pit leak detection systems, construction of replacement cover blocks, and electrical upgrades to support the instrumentation upgrades.

  20. Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)

    SciTech Connect

    Gilbert, J.L.

    1998-07-23

    The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454.

  1. The 12 GeV JLab Upgrade Project

    SciTech Connect

    Smith, Elton

    2009-01-01

    The upgrade of the CEBAF Accelerator at Jefferson Lab to 12 GeV will deliver high luminosity and high quality beams, which will open unique opportunities for studies of the quark and gluon structure of hadrons in the valence region. Such physics will be made accessible by substantial additions to the experimental equipment in combination with the increased energy reach of the upgraded machine. The emphasis of the talk will be on the program in a new experimental Hall D designed to search for gluonic excitations.

  2. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    SciTech Connect

    Seberger, C.D.; Chargin, A.K.

    1981-10-26

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information.

  3. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    SciTech Connect

    Boes, K.A.

    1998-04-15

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314`s 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project`s work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  4. Upgraded vacuum arc ion source for metal ion implantation

    SciTech Connect

    Nikolaev, A. G.; Oks, E. M.; Savkin, K. P.; Yushkov, G. Yu.; Brown, I. G.

    2012-02-15

    Vacuum arc ion sources have been made and used by a large number of research groups around the world over the past twenty years. The first generation of vacuum arc ion sources (dubbed ''Mevva,'' for metal vapor vacuum arc) was developed at Lawrence Berkeley National Laboratory in the 1980s. This paper considers the design, performance parameters, and some applications of a new modified version of this kind of source which we have called Mevva-V.Ru. The source produces broad beams of metal ions at an extraction voltage of up to 60 kV and a time-averaged ion beam current in the milliampere range. Here, we describe the Mevva-V.Ru vacuum arc ion source that we have developed at Tomsk and summarize its beam characteristics along with some of the applications to which we have put it. We also describe the source performance using compound cathodes.

  5. A new FEBIAD-type ion source for the upgrade of SPIRAL1 at GANIL

    NASA Astrophysics Data System (ADS)

    Chauveau, P.; Delahaye, P.; Babo, M.; Bouzomita, H.; Bajeat, O.; Dubois, M.; Frigot, R.; Grinyer, G. F.; Grinyer, J.; Jardin, P.; Leboucher, C.; Maunoury, L.; Seiffert, C.; Stora, T.; Thomas, J. C.; Traykov, E.

    2016-06-01

    The SPIRAL facility at GANIL is being upgraded with a new FEBIAD ion source in order to extend its production capabilities to condensable elements. The coupling of such an ion source with the present GANIL target was recently tested online at SPIRAL at nominal power (1200 W). The results are promising as the calculated yields are in the range of those extrapolated from previous measurements at lower power and sometimes higher. This experiment and its results are presented.

  6. Advanced Ground Systems Maintenance Cryogenics Test Lab Control System Upgrade Project

    NASA Technical Reports Server (NTRS)

    Harp, Janice Leshay

    2014-01-01

    This project will outfit the Simulated Propellant Loading System (SPLS) at KSC's Cryogenics Test Laboratory with a new programmable logic control system. The control system upgrade enables the Advanced Ground Systems Maintenace Element Integration Team and other users of the SPLS to conduct testing in a controls environment similar to that used at the launch pad.

  7. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    SciTech Connect

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  8. Canted Undulator Upgrade for GeoSoilEnviroCARS Sector 13 at the Advanced Photon Source

    SciTech Connect

    Sutton, Stephen

    2013-02-02

    Support for the beamline component of the canted undulator upgrade of Sector 13 (GeoSoilEnviroCARS; managed and operated by the University of Chicago) at the Advanced Photon Source (APS; Argonne National Laboratory) was received from three agencies (equally divided): NASA-SRLIDAP (now LARS), NSF-EAR-IF (ARRA) and DOE-Single Investigator Small Group (SISGR). The associated accelerator components (undulators, canted front end) were provided by the APS using DOE-ARRA funding. The intellectual merit of the research enabled by the upgrade lies in advancing our knowledge of the composition, structure and properties of earth materials; the processes they control; and the processes that produce them. The upgrade will facilitate scientific advances in the following areas: high pressure mineral physics and chemistry, non-crystalline and nano-crystalline materials at high pressure, chemistry of hydrothermal fluids, reactions at mineral-water interfaces, biogeochemistry, oxidation states of magmas, flow dynamics of fluids and solids, and cosmochemistry. The upgrade, allowing the microprobe to operate 100% of the time and the high pressure and surface scattering and spectroscopy instruments to receive beam time increases, will facilitate much more efficient use of the substantial investment in these instruments. The broad scientific community will benefit by the increase in the number of scientists who conduct cutting-edge research at GSECARS. The user program in stations 13ID-C (interface scattering) and 13ID-D (laser heated diamond anvil cell and large volume press) recommenced in June 2012. The operation of the 13ID-E microprobe station began in the Fall 2012 cycle (Oct.-Dec 2012). The upgraded canted beamlines double the amount of undulator beam time at Sector 13 and provide new capabilities including extended operations of the X-ray microprobe down to the sulfur K edge and enhanced brightness at high energy. The availability of the upgraded beamlines will advance the

  9. Superconducting link bus design for the accelerator project for upgrade of LHC

    SciTech Connect

    Nobrega, F.; Brandt, J.; Cheban, S.; Feher, S.; Kaducak, M.; Kashikhin, V.; Peterson, T.; /Fermilab

    2011-06-01

    The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. Fermi National Accelerator Laboratory in collaboration with Brookhaven National Laboratory was developing sub-systems for the upgrade of the LHC final focus magnet systems. Part of the upgrade called for various lengths of superconducting power transmission lines known as SC Links which were up to 100 m long. The SC Link electrically connects the current leads in the Distribution Feed Boxes to the interaction region magnets. The SC Link is an extension of the magnet bus housed within a cryostat. The present concept for the bus consists of 22 power cables, 4 x 13 kA, 2 x 7 kA, 8 x 2.5 kA and 8 x 0.6 kA bundled into one bus. Different cable and strand possibilities were considered for the bus design including Rutherford cable. The Rutherford cable bus design potentially would have required splices at each sharp elbow in the SC Link. The advantage of the round bus design is that splices are only required at each end of the bus during installation at CERN. The round bus is very flexible and is suitable for pulling through the cryostat. Development of the round bus prototype and of 2 splice designs is described in this paper. Magnetic analysis and mechanical test results of the 13 kA cable and splices are presented.

  10. Superconducting link bus design for the accelerator project for upgrade of LHC

    SciTech Connect

    Nobrega, F.; Brandt, J.; Cheban, S.; Feher, S.; Kaducak, M.; Kashikhin, V.; Peterson, T.; /Fermilab

    2010-08-01

    The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. Fermi National Accelerator Laboratory in collaboration with Brookhaven National Laboratory was developing sub-systems for the upgrade of the LHC final focus magnet systems. Part of the upgrade called for various lengths of superconducting power transmission lines known as SC Links which were up to 100 m long. The SC Link electrically connects the current leads in the Distribution Feed Boxes to the interaction region magnets. The SC Link is an extension of the magnet bus housed within a cryostat. The present concept for the bus consists of 22 power cables, 4 x 13 kA, 2 x 7 kA, 8 x 2.5 kA and 8 x 0.6 kA bundled into one bus. Different cable and strand possibilities were considered for the bus design including Rutherford cable. The Rutherford cable bus design potentially would have required splices at each sharp elbow in the SC Link. The advantage of the round bus design is that splices are only required at each end of the bus during installation at CERN. The round bus is very flexible and is suitable for pulling through the cryostat. Development of the round bus prototype and of 2 splice designs is described in this paper. Magnetic analysis and mechanical test results of the 13 kA cable and splices are presented.

  11. Conceptual Design Report for a Phase 3 upgrade of the National Synchrotron Light Source

    SciTech Connect

    Foyt, W.; Krinsky, S.; Hastings, J.; Finlay, L.

    1994-03-01

    Considerable investment by both the Department of Energy and the facility`s Participating Research teams has permitted the NSLS to offer a national facility to a wide range of scientific pursuits. The purpose of the NSLS Phase III project is to maximize the scientific output of this premier 2nd generation synchrotron radiation facility through a number of distinct projects. Over the years the NSLS has made significant improvements in the area of beam reliability which has resulted in deliverable, reproducible beam during 98% and 97% of scheduled operations on the VUV and X-ray rings respectively. This project will focus on improving beam intensity and stability by upgrading the optics and detector systems on a number of beamlines as well as upgrading radio frequency (rf) and beam position monitoring systems in the storage rings. In addition, the project includes plans for the design and procurement of a utility isolation system that would guard against voltage transients that disrupt the facility`s electrical system. Also a new insertion device will be installed at beamline X25 and a 2nd floor will be constructed over the X6 -- X16 region which will provide sorely needed laboratory and office space for the user community. This project requests funding of 22.5 million dollars over a three year period: FY 1996 ($6.3M), FY 1997 ($13.4M) and FY 1998 ($2.8M).

  12. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    SciTech Connect

    Hays, W.H.

    1998-05-19

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  13. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    SciTech Connect

    Hays, W.H.

    1998-05-19

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  14. Progress on an energy recovery linac upgrade to the Advanced Photon Source

    SciTech Connect

    Borland, Michael; Dong Xiaowei; Li Yuelin

    2010-06-23

    The Advanced Photon Source (APS) is a third-generation storage-ring-based x-ray source that has been operating for more than 13 years and is enjoying a long period of stable, reliable operation. However, major accelerator upgrades are being investigated in order to maintain scientific relevance into the future. One very promising possibility is the use of an energy recovery linac (ERL). In this option, APS would transition from a source based on a stored electron beam to one based on a continuously generated high-brightness electron beam from a linac. Such a source promises dramatically improved brightness and transverse coherence compared to third-generation storage rings. We present a new design for an ERL upgrade that incorporates very long insertion devices. We show that operation at high electron beam energy provides the promise of extremely high brightness for hard x-rays. We also show results of the first start-to-end simulations of an ERL-based x-ray source.

  15. Students Upgrading through Computer and Career Education System Services (Project SUCCESS). Final Evaluation Report 1993-94. OER Report.

    ERIC Educational Resources Information Center

    Greene, Judy

    Students Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its fourth year of operation. The project operated at two high schools in Brooklyn and one in Manhattan (New York). In the 1993-94 school year, the project served 393 students of…

  16. The Employment Impact of the Des Moines Occupational Upgrading Project and Model Cities High School Equivalency Project: Project Year One Evaluation.

    ERIC Educational Resources Information Center

    Palomba, Neil A.; And Others

    This study was conducted to: (1) evaluate the Occupational Upgrading Project (OUP) and the Model Neighborhood High School Equivalency (HSE) Project's first year of operation, and (2) create baseline data from which future and more conclusive evaluation can be undertaken. Data were gathered by conducting open-ended interviews with the…

  17. Upgrade of the BATMAN test facility for H{sup −} source development

    SciTech Connect

    Heinemann, B. Fröschle, M.; Falter, H.-D.; Fantz, U.; Franzen, P.; Kraus, W.; Nocentini, R.; Riedl, R.; Ruf, B.

    2015-04-08

    The development of a radio frequency (RF) driven source for negative hydrogen ions for the neutral beam heating devices of fusion experiments has been successfully carried out at IPP since 1996 on the test facility BATMAN. The required ITER parameters have been achieved with the prototype source consisting of a cylindrical driver on the back side of a racetrack like expansion chamber. The extraction system, called “Large Area Grid” (LAG) was derived from a positive ion accelerator from ASDEX Upgrade (AUG) using its aperture size (ø 8 mm) and pattern but replacing the first two electrodes and masking down the extraction area to 70 cm2. BATMAN is a well diagnosed and highly flexible test facility which will be kept operational in parallel to the half size ITER source test facility ELISE for further developments to improve the RF efficiency and the beam properties. It is therefore planned to upgrade BATMAN with a new ITER-like grid system (ILG) representing almost one ITER beamlet group, namely 5 × 14 apertures (ø 14 mm). Additionally to the standard three grid extraction system a repeller electrode upstream of the grounded grid can optionally be installed which is positively charged against it by 2 kV. This is designated to affect the onset of the space charge compensation downstream of the grounded grid and to reduce the backstreaming of positive ions from the drift space backwards into the ion source. For magnetic filter field studies a plasma grid current up to 3 kA will be available as well as permanent magnets embedded into a diagnostic flange or in an external magnet frame. Furthermore different source vessels and source configurations are under discussion for BATMAN, e.g. using the AUG type racetrack RF source as driver instead of the circular one or modifying the expansion chamber for a more flexible position of the external magnet frame.

  18. Current Lead Design for the Accelerator Project for Upgrade of LHC

    SciTech Connect

    Brandt, Jeffrey S.; Cheban, Sergey; Feher, Sandor; Kaducak, Marc; Nobrega, Fred; Peterson, Tom

    2010-01-01

    The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. In collaboration with Brookhaven National Laboratory, Fermilab is developing sub-systems for an upgrade of the LHC final focus magnet systems. A concept of main and auxiliary helium flow was developed that allows the superconductor to remain cold while the lead body warms up to prevent upper section frosting. The auxiliary flow will subsequently cool the thermal shields of the feed box and the transmission line cryostats. A thermal analysis of the current lead central heat exchange section was performed using analytic and FEA techniques. A method of remote soldering was developed that allows the current leads to be field replaceable. The remote solder joint was designed to be made without flux or additional solder, and able to be remade up to ten full cycles. A method of upper section attachment was developed that allows high pressure sealing of the helium volume. Test fixtures for both remote soldering and upper section attachment for the 13 kA lead were produced. The cooling concept, thermal analyses, and test results from both remote soldering and upper section attachment fixtures are presented.

  19. Successful Completion of the Top-off Upgrade of the Advanced Light Source

    SciTech Connect

    Steier, C.; Bailey, B.; Baptiste, K.; Barry, W.; Biocca, A.; Byrne, W.; Casey, P.; Chin, M.; Donahue, R.; Duarte, R.; Fahmie, M.; Gath, B.; Jacobson, S.; Julian, J.; Jung, J. Y.; Kritscher, M.; Kwiatkowski, S.; Marks, S.; McKean, P.; Mueller, R.

    2010-06-23

    An upgrade of the Advanced Light Source (ALS) to enable top-off operation has been completed during the last four years. The final work centered around radiation safety aspects, culminating in a systematic proof that top-off operation is equally safe as decaying beam operation. Commissioning and transition to full user operations happened in late 2008 and early 2009. Top-off operation at the ALS provides a very large increase in time-averaged brightness (by about a factor of 10) as well as improvements in beam stability. The following sections provide an overview of the radiation safety rationale, commissioning results, as well as experience in user operations.

  20. Advanced conceptual design report: T Plant secondary containment and leak detection upgrades. Project W-259

    SciTech Connect

    Hookfin, J.D.

    1995-05-12

    The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades.

  1. Upgrade of Compressed Air Control System Reduces Energy Costs at Michelin Tire Plant. Office of Industrial Technologies (OIT) BestPractices Project Case Study

    SciTech Connect

    Not Available

    2002-01-01

    This case study highlights the upgraded compressed air system at a Michelin tire manufacturing plant in Spartanburg, South Carolina. The controls upgrade project enabled multiple compressor operation without blow-off, and significantly reduced energy costs.

  2. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    SciTech Connect

    Boes, K.A.

    1998-01-13

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314`s AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms` waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project`s work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits.

  3. Recent developments and upgrades in ion source technology and ion beam systems at HVE

    NASA Astrophysics Data System (ADS)

    Podaru, Nicolae C.; Mous, Dirk J. W.

    2016-03-01

    In this paper we discuss various ion sources used in particle accelerator systems dedicated to ion beam analysis techniques. Key performance and characteristics of some ion sources are discussed: emittance, brightness, gas consumption, sample consumption efficiency, lifetime, etc. For negative ion sources, we focus on the performance of volume H- ion sources (e.g. HVE model 358), the duoplasmatron negative ion source and the magnetically filtered multicusp volume sources (e.g. HVE model SO-120). The duoplasmatron ion source has been recently upgraded with a Ta filament to deliver up to 150 μA H- ion beams and in conjunction with the Na charge exchange canal up to 20 μA of He-. The available brightness from the duoplasmatron increased from 2 to 6 A m-2 rad-2 eV-1. The ion source has been incorporated in a stand-alone light ion injector, well suited to deliver 20-30 keV negative ion beams of H-, He-, C-, NHx- and O- to accelerate for most ion beam analysis techniques.

  4. Students Upgrading through Computer and Career Education System Services (Project SUCCESS). Final Evaluation Report 1992-93. OER Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Student Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its third year of operation. Project SUCCESS served 460 students of limited English proficiency at two high schools in Brooklyn and one high school in Manhattan (New York City).…

  5. The upgrade project for the RF system for the Brookhaven AGS

    SciTech Connect

    Brennan, J.M.; Ciardullo, D.J.; Hayes, T.; Meth, M.; McNerney, A.J.; Otis, A.; Pirkl, W.; Sanders, R.; Spitz, R.; Toldo, F.; Zaltsman, A.

    1993-06-01

    The AGS operates a varied program of proton, heavy ion, and polarized proton acceleration for fixed-target experiments and will soon serve as the injector of these beams into the Relativistic Heavy Ion Collider, RHIC. The new Booster synchrotron extends the range of intensities and masses that can be accelerated. The 1.5 GeV injection energy increases the space charge limit by a factor of four to more than 6 {times} 10{sup 13} protons per pulse. To accommodate the increased beam current the rf system will be upgraded to provide more power and lower impedance to the beam. The flexibility of the rf system will also be enhanced by virtue of a new rf beam control system and installation of individual tuning servos for the ten rf cavities. The fundamental necessity for upgrading the rf system is to deliver more power to the accelerating beam. Three key ingredients of the upgrade project addressing this problem is (1) new power amplifiers provide the necessary power, and are closely coupled to the cavities, (2) wideband rf feedback reduces the effective impedance by a factor of 10, and (3) the capacitors loading the acceleration gaps (four per cavity) are increased from 275 pF to 600 pF.

  6. The upgrade project for the RF system for the Brookhaven AGS

    SciTech Connect

    Brennan, J.M.; Ciardullo, D.J.; Hayes, T.; Meth, M.; McNerney, A.J.; Otis, A.; Pirkl, W.; Sanders, R.; Spitz, R.; Toldo, F.; Zaltsman, A.

    1993-01-01

    The AGS operates a varied program of proton, heavy ion, and polarized proton acceleration for fixed-target experiments and will soon serve as the injector of these beams into the Relativistic Heavy Ion Collider, RHIC. The new Booster synchrotron extends the range of intensities and masses that can be accelerated. The 1.5 GeV injection energy increases the space charge limit by a factor of four to more than 6 [times] 10[sup 13] protons per pulse. To accommodate the increased beam current the rf system will be upgraded to provide more power and lower impedance to the beam. The flexibility of the rf system will also be enhanced by virtue of a new rf beam control system and installation of individual tuning servos for the ten rf cavities. The fundamental necessity for upgrading the rf system is to deliver more power to the accelerating beam. Three key ingredients of the upgrade project addressing this problem is (1) new power amplifiers provide the necessary power, and are closely coupled to the cavities, (2) wideband rf feedback reduces the effective impedance by a factor of 10, and (3) the capacitors loading the acceleration gaps (four per cavity) are increased from 275 pF to 600 pF.

  7. Achievements of the ATLAS upgrade Planar Pixel Sensors R&D Project

    NASA Astrophysics Data System (ADS)

    Nellist, C.

    2015-01-01

    In the framework of the HL-LHC upgrade, the ATLAS experiment plans to introduce an all-silicon inner tracker to cope with the elevated occupancy. To investigate the suitability of pixel sensors using the proven planar technology for the upgraded tracker, the ATLAS Planar Pixel Sensor R&D Project (PPS) was established comprising 19 institutes and more than 90 scientists. The paper provides an overview of the research and development project and highlights accomplishments, among them: beam test results with planar sensors up to innermost layer fluences (>1016 neq cm-2) measurements obtained with irradiated thin edgeless n-in-p pixel assemblies; recent studies of the SCP technique to obtain almost active edges by post-processing already existing sensors based on scribing, cleaving and edge passivation; an update on prototyping efforts for large areas: sensor design improvements and concepts for low-cost hybridisation; comparison between Secondary Ion Mass Spectrometry results and TCAD simulations. Together, these results allow an assessment of the state-of-the-art with respect to radiation-hard position-sensitive tracking detectors suited for the instrumentation of large areas.

  8. Designs and measurements of gradient dipole magnets for the upgrade of Pohang Light Source

    NASA Astrophysics Data System (ADS)

    Chen, Y.; Kim, D. E.; Kang, W.; Chen, F. S.; Yang, M.; Zhang, Z.; Yin, B. G.; Zhou, J. X.

    2012-08-01

    The compact size of the upgrade of Pohang Light Source (PLS-II) ring implies the use of gradient dipole magnets, with high field quality requirements. The PLS-II ring contains 24 such dipoles. Detailed 2D and 3D physical designs are reported; they include conformal mapping, equivalent 2D compact factor, residues fitting technique and end chamfer in a concise straight line style. According to the field measurement results, a beam based alignment technique for the rms variation reduction was employed. With that, the uniformities for these dipoles can be reduced to less than 2.0E-04, and the rms variation from dipole to dipole can reach 5.82E-04.

  9. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-10

    ... Transmission Line Projects under section 1222 of EPAct (73 FR 70636 and 70638 respectively). Southwestern... Western's participation in the upgrade of existing transmission facilities owned by either PMA, or the construction of new transmission lines in the states in which either PMA operates. DATES: Project...

  10. The Students Upgrading through Computer and Career Education Systems Services (Project SUCCESS). 1990-91 Final Evaluation Profile. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of the New York City Public Schools' Student Upgrading through Computer and Career Education Systems Services Program (Project SUCCESS). Project SUCCESS operated at 3 high schools in Brooklyn and Manhattan (Murry Bergtraum High School, Edward R. Murrow High School, and John Dewey High School). It enrolled limited English…

  11. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    SciTech Connect

    Rhea, T.A.; Rucker, T.L.; Stafford, M.W.

    1990-09-28

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical.

  12. Conceptual design report, 219-S secondary containment upgrade, Project W-178

    SciTech Connect

    Beyer, J.J.

    1993-05-01

    The 219-S Facility is located in the 200-West Area on the Hanford Site and was constructed in 1951. The facility receives and treats liquid, low-level mixed waste from the 222-S Laboratory prior to transfer of that waste to the SY Tank Farm. The 219-S Facility consists of Cell A containing Tanks 101 and 102 and Cell B containing Tank 103 and a spare space. Project W-178 will modify the 219-S Facility to bring it into compliance with the tank system standards in WAC 173-303-640. The secondary containment upgrade will consist of a stainless steel cell liner in both Cell A and the spare space in Cell B. Additionally, Cell B will be modified by taking Tank 103 out of service and installing a new tank: Tank 104. The construction work will be accomplished in phases to minimize service interruption to the 222-S Laboratory. The proposed design and construction method is the most cost effective of four alternatives evaluated during a value engineering session. Project W-178 is a fiscal year 1995 Line Item. Total estimated construction costs of the project are $2,600,000; other project costs are $710,000. The total project cost is $3,300,000.

  13. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    SciTech Connect

    Kelley, S.; Bolian, T. W.

    2006-07-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations.

  14. Upgrades to the ultracold neutron source at the Los Alamos Neutron Science Center

    NASA Astrophysics Data System (ADS)

    Pattie, Robert; LANL-nEDM Collaboration

    2015-10-01

    The spallation-driven solid deutrium-based ultracold neutron (UCN) source at the Los Alamos Neutron Science Center (LANSCE) has provided a facility for precision measurements of fundamental symmetries via the decay observables from neutron beta decay for nearly a decade. In preparation for a new room temperature neutron electric dipole moment (nEDM) experiment and to increase the statistical sensitivity of all experiments using the source an effort to increase the UCN output is underway. The ultimate goal is to provide a density of 100 UCN/cc or greater in the nEDM storage cell. This upgrade includes redesign of the cold neutron moderator and UCN converter geometries, improved coupling and coating of the UCN transport system through the biological shielding, optimization of beam timing structure, and increase of the proton beam current. We will present the results of the MCNP and UCN transport simulations that led to the new design, which will be installed spring 2016, and UCN guide tests performed at LANSCE and the Institut Laue-Langevin to study the UCN transport properties of a new nickel-based guide coating.

  15. Fast and efficient charge breeding of the Californium rare isotope breeder upgrade electron beam ion source

    DOE PAGESBeta

    Ostroumov, P. N.; Barcikowski, A.; Dickerson, C. A.; Perry, A.; Pikin, A. I.; Sharamentov, S. I.; Vondrasek, R. C.; Zinkann, G. P.

    2015-08-28

    The Electron Beam Ion Source (EBIS), developed to breed Californium Rare Isotope Breeder Upgrade (CARIBU) radioactive beams at Argonne Tandem Linac Accelerator System (ATLAS), is being tested off-line. A unique property of the EBIS is a combination of short breeding times, high repetition rates, and a large acceptance. Overall, we have implemented many innovative features during the design and construction of the CARIBU EBIS as compared to the existing EBIS breeders. The off-line charge breeding tests are being performed using a surface ionization source that produces singly charged cesium ions. The main goal of the off-line commissioning is to demonstratemore » stable operation of the EBIS at a 10 Hz repetition rate and a breeding efficiency into single charge state higher than 15%. These goals have been successfully achieved and exceeded. We have measured (20% ± 0.7%) breeding efficiency into the single charge state of 28+ cesium ions with the breeding time of 28 ms. In general, the current CARIBU EBIS operational parameters can provide charge breeding of any ions in the full mass range of periodic table with high efficiency, short breeding times, and sufficiently low charge-to-mass ratio, 1/6.3 for the heaviest masses, for further acceleration in ATLAS. In this study, we discuss the parameters of the EBIS and the charge breeding results in a pulsed injection mode with repetition rates up to 10 Hz.« less

  16. Fast and efficient charge breeding of the Californium rare isotope breeder upgrade electron beam ion source

    SciTech Connect

    Ostroumov, P. N. Barcikowski, A.; Dickerson, C. A.; Perry, A.; Sharamentov, S. I.; Vondrasek, R. C.; Zinkann, G. P.; Pikin, A. I.

    2015-08-15

    The Electron Beam Ion Source (EBIS), developed to breed Californium Rare Isotope Breeder Upgrade (CARIBU) radioactive beams at Argonne Tandem Linac Accelerator System (ATLAS), is being tested off-line. A unique property of the EBIS is a combination of short breeding times, high repetition rates, and a large acceptance. Overall, we have implemented many innovative features during the design and construction of the CARIBU EBIS as compared to the existing EBIS breeders. The off-line charge breeding tests are being performed using a surface ionization source that produces singly charged cesium ions. The main goal of the off-line commissioning is to demonstrate stable operation of the EBIS at a 10 Hz repetition rate and a breeding efficiency into single charge state higher than 15%. These goals have been successfully achieved and exceeded. We have measured (20% ± 0.7%) breeding efficiency into the single charge state of 28+ cesium ions with the breeding time of 28 ms. In general, the current CARIBU EBIS operational parameters can provide charge breeding of any ions in the full mass range of periodic table with high efficiency, short breeding times, and sufficiently low charge-to-mass ratio, 1/6.3 for the heaviest masses, for further acceleration in ATLAS. In this paper, we discuss the parameters of the EBIS and the charge breeding results in a pulsed injection mode with repetition rates up to 10 Hz.

  17. Fast and efficient charge breeding of the Californium rare isotope breeder upgrade electron beam ion source.

    PubMed

    Ostroumov, P N; Barcikowski, A; Dickerson, C A; Perry, A; Pikin, A I; Sharamentov, S I; Vondrasek, R C; Zinkann, G P

    2015-08-01

    The Electron Beam Ion Source (EBIS), developed to breed Californium Rare Isotope Breeder Upgrade (CARIBU) radioactive beams at Argonne Tandem Linac Accelerator System (ATLAS), is being tested off-line. A unique property of the EBIS is a combination of short breeding times, high repetition rates, and a large acceptance. Overall, we have implemented many innovative features during the design and construction of the CARIBU EBIS as compared to the existing EBIS breeders. The off-line charge breeding tests are being performed using a surface ionization source that produces singly charged cesium ions. The main goal of the off-line commissioning is to demonstrate stable operation of the EBIS at a 10 Hz repetition rate and a breeding efficiency into single charge state higher than 15%. These goals have been successfully achieved and exceeded. We have measured (20% ± 0.7%) breeding efficiency into the single charge state of 28+ cesium ions with the breeding time of 28 ms. In general, the current CARIBU EBIS operational parameters can provide charge breeding of any ions in the full mass range of periodic table with high efficiency, short breeding times, and sufficiently low charge-to-mass ratio, 1/6.3 for the heaviest masses, for further acceleration in ATLAS. In this paper, we discuss the parameters of the EBIS and the charge breeding results in a pulsed injection mode with repetition rates up to 10 Hz. PMID:26329185

  18. Fast and efficient charge breeding of the Californium rare isotope breeder upgrade electron beam ion source

    SciTech Connect

    Ostroumov, P. N.; Barcikowski, A.; Dickerson, C. A.; Perry, A.; Pikin, A. I.; Sharamentov, S. I.; Vondrasek, R. C.; Zinkann, G. P.

    2015-08-28

    The Electron Beam Ion Source (EBIS), developed to breed Californium Rare Isotope Breeder Upgrade (CARIBU) radioactive beams at Argonne Tandem Linac Accelerator System (ATLAS), is being tested off-line. A unique property of the EBIS is a combination of short breeding times, high repetition rates, and a large acceptance. Overall, we have implemented many innovative features during the design and construction of the CARIBU EBIS as compared to the existing EBIS breeders. The off-line charge breeding tests are being performed using a surface ionization source that produces singly charged cesium ions. The main goal of the off-line commissioning is to demonstrate stable operation of the EBIS at a 10 Hz repetition rate and a breeding efficiency into single charge state higher than 15%. These goals have been successfully achieved and exceeded. We have measured (20% ± 0.7%) breeding efficiency into the single charge state of 28+ cesium ions with the breeding time of 28 ms. In general, the current CARIBU EBIS operational parameters can provide charge breeding of any ions in the full mass range of periodic table with high efficiency, short breeding times, and sufficiently low charge-to-mass ratio, 1/6.3 for the heaviest masses, for further acceleration in ATLAS. In this study, we discuss the parameters of the EBIS and the charge breeding results in a pulsed injection mode with repetition rates up to 10 Hz.

  19. Fast and efficient charge breeding of the Californium rare isotope breeder upgrade electron beam ion source

    NASA Astrophysics Data System (ADS)

    Ostroumov, P. N.; Barcikowski, A.; Dickerson, C. A.; Perry, A.; Pikin, A. I.; Sharamentov, S. I.; Vondrasek, R. C.; Zinkann, G. P.

    2015-08-01

    The Electron Beam Ion Source (EBIS), developed to breed Californium Rare Isotope Breeder Upgrade (CARIBU) radioactive beams at Argonne Tandem Linac Accelerator System (ATLAS), is being tested off-line. A unique property of the EBIS is a combination of short breeding times, high repetition rates, and a large acceptance. Overall, we have implemented many innovative features during the design and construction of the CARIBU EBIS as compared to the existing EBIS breeders. The off-line charge breeding tests are being performed using a surface ionization source that produces singly charged cesium ions. The main goal of the off-line commissioning is to demonstrate stable operation of the EBIS at a 10 Hz repetition rate and a breeding efficiency into single charge state higher than 15%. These goals have been successfully achieved and exceeded. We have measured (20% ± 0.7%) breeding efficiency into the single charge state of 28+ cesium ions with the breeding time of 28 ms. In general, the current CARIBU EBIS operational parameters can provide charge breeding of any ions in the full mass range of periodic table with high efficiency, short breeding times, and sufficiently low charge-to-mass ratio, 1/6.3 for the heaviest masses, for further acceleration in ATLAS. In this paper, we discuss the parameters of the EBIS and the charge breeding results in a pulsed injection mode with repetition rates up to 10 Hz.

  20. SUPERCONDUCTING LINAC UPGRADE PLAN FOR THE SECOND TARGET STATION PROJECT AT SNS

    SciTech Connect

    Kim, Sang-Ho; Doleans, Marc; Galambos, John D; Howell, Matthew P; Mammosser, John

    2015-01-01

    The beam power of the Linac for the Second Target Station (STS) at the Spallation Neutron Source (SNS) will be doubled to 2.8 MW. For the energy upgrade, seven additional cryomodules will be installed in the reserved space at the end of the linac tunnel to produce linac output energy of 1.3 GeV. The cryomodules for STS will have the same physical length but will incorporate some design changes based on the lessons learned from operational experience over the last 10 years and from the high beta spare cryomodule developed in house. The average macro-pulse beam current for the STS will be 38 mA which is about a 40 % increase from the present beam current for 1.4 MW operation. Plans for the new cryomodules and for the existing cryomodules to support higher beam current for the STS are presented in this paper.

  1. The Academic Bilingual and Career Upgrading System (Project ABACUS). Final Evaluation Report, 1992-93. OER Report.

    ERIC Educational Resources Information Center

    Law, Tim

    The Academic Bilingual and Career Upgrading System (Project ABACUS) was a federally-funded program in its fourth year at two Brooklyn and one Queens (New York) high schools. The program served 475 limited-English-speaking students who were native speakers of Chinese, Korean, and Spanish. Students received instruction in English as a second…

  2. Evaluation of Child Care Subsidy Strategies: Implementation of Three Language and Literacy Interventions in Project Upgrade. OPRE 2011-4

    ERIC Educational Resources Information Center

    Layzer, Carolyn J.; Layzer, Jean I.; Wolf, Anne

    2010-01-01

    This report describes the design and implementation of the three interventions tested in Project Upgrade, one of four experiments conducted as part of the Evaluation of Child Care Subsidy Strategies. The evaluation was a multi-site, multi-year effort to determine whether and how different child care subsidy policies and procedures and quality…

  3. Candle Synchrotron Light Source Project

    NASA Astrophysics Data System (ADS)

    Tsakanov, V. M.

    CANDLE - Center for the Advancement of Natural Discoveries using Light Emission - is a 3 GeV energy synchrotron light facility project in the Republic of Armenia. The main design features of the new facility are given. The results of the beam physics study in the future facility is overviewed including the machine impedance, single and multi-bunch instabilities, ion trapping and beam lifetime. The preliminary list of first group beamlines is discussed.

  4. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  5. Preliminary safety analysis report for project 89-GEB-610 Plutonium Finishing Plant instrumentation upgrade. Revision 1

    SciTech Connect

    Huber, T.E.

    1995-10-24

    This document consists of an analysis of the MICON system upgrade. This project shall install a Micon Co. distributed process monitor and control system with Sparc Sun workstation operator interfaces. The Sparc workstations are housed in consoles custom designed to human factors specifications. The distributed control system (DCS) shall have the installed capacity to monitor and control all related instruments and equipment presently connected to the panels in the PFP Power Control Room 321A as listed in the input/output list. This also includes all devices monitored and controlled by the 2736-ZB Allen Bradley programmable logic controller. The system has since assumed the control and monitoring responsibilities for Projects B- 680H ``Low Level Waste Treatment Facility`` and C-031H ``PFP Liquid Effluent Facilities``. Part of the new en`s change area in Building 234-5ZA, Room 712, has been remodeled to house two consoles and one supervisor console. Local control units containing the microprocontrollers and the input/output interface circuit boards shall be wired to the instrumentation and controlled equipment. These units communicate with the Sparc workstations via a redundant data communications highway and shall be strategic, throughout the PFP facility. The DCS has already been purchased from Micon Co., located in Houston Texas, presently on site.

  6. Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project

    SciTech Connect

    Drury, Michael A.; Burrill, Andrew B.; Davis, G. Kirk; Hogan, John P.; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joseph; Reece, Charles E.; Reilly, Anthony V.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

    2012-09-01

    The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the project is a doubling of the available beam energy of CEBAF from 6 GeV to 12 GeV. This increase in beam energy will be due primarily to the construction and installation of ten "C100" cryomodules in the CEBAF linacs. The C100 cryomodules are designed to deliver an average 108 MV each from a string of eight seven-cell, electropolished superconducting RF cavities operating at an average accelerating gradient of 19.2 MV/m. The new cryomodules fit in the same available linac space as the original CEBAF 20 MV cryomodules. Cryomodule production started in September 2010. Initial acceptance testing started in June 2011. The first two C100 cryomodules were installed and tested from August 2011 through October 2011, and successfully operated during the last period of the CEBAF 6 GeV era, which ended in May 2012. This paper will present the results of acceptance testing and commissioning of the C100 style cryomodules to date.

  7. Operability test procedure for the 340-NT-EX stack upgrades -- Project W337

    SciTech Connect

    Hagerty, K.J.

    1994-12-15

    The purpose of the 340-NT-EX sampling system upgrade Operability Test Procedure (OTP) is to test and ensure the sampler system upgrades correctly interface with the control room alarm and recording functions. The sampling system monitors the exhaust air from a 300 Area waste handling facility for alpha, beta, gamma, particulate, and iodine releases.

  8. Upgrade of the beam extraction system of the GTS-LHC electron cyclotron resonance ion source at CERN.

    PubMed

    Toivanen, V; Bellodi, G; Dimov, V; Küchler, D; Lombardi, A M; Maintrot, M

    2016-02-01

    Linac3 is the first accelerator in the heavy ion injector chain of the Large Hadron Collider (LHC), providing multiply charged heavy ion beams for the CERN experimental program. The ion beams are produced with GTS-LHC, a 14.5 GHz electron cyclotron resonance ion source, operated in afterglow mode. Improvement of the GTS-LHC beam formation and beam transport along Linac3 is part of the upgrade program of the injector chain in preparation for the future high luminosity LHC. A mismatch between the ion beam properties in the ion source extraction region and the acceptance of the following Low Energy Beam Transport (LEBT) section has been identified as one of the factors limiting the Linac3 performance. The installation of a new focusing element, an einzel lens, into the GTS-LHC extraction region is foreseen as a part of the Linac3 upgrade, as well as a redesign of the first section of the LEBT. Details of the upgrade and results of a beam dynamics study of the extraction region and LEBT modifications will be presented. PMID:26932084

  9. Upgrade of the beam extraction system of the GTS-LHC electron cyclotron resonance ion source at CERN

    NASA Astrophysics Data System (ADS)

    Toivanen, V.; Bellodi, G.; Dimov, V.; Küchler, D.; Lombardi, A. M.; Maintrot, M.

    2016-02-01

    Linac3 is the first accelerator in the heavy ion injector chain of the Large Hadron Collider (LHC), providing multiply charged heavy ion beams for the CERN experimental program. The ion beams are produced with GTS-LHC, a 14.5 GHz electron cyclotron resonance ion source, operated in afterglow mode. Improvement of the GTS-LHC beam formation and beam transport along Linac3 is part of the upgrade program of the injector chain in preparation for the future high luminosity LHC. A mismatch between the ion beam properties in the ion source extraction region and the acceptance of the following Low Energy Beam Transport (LEBT) section has been identified as one of the factors limiting the Linac3 performance. The installation of a new focusing element, an einzel lens, into the GTS-LHC extraction region is foreseen as a part of the Linac3 upgrade, as well as a redesign of the first section of the LEBT. Details of the upgrade and results of a beam dynamics study of the extraction region and LEBT modifications will be presented.

  10. An Upgrade for the Brazilian Synchrotron Light Source: Are you Sirius?

    NASA Astrophysics Data System (ADS)

    Roque da Silva, Antonio José

    2015-03-01

    The application of synchrotron radiation in a great variety of fields in general, and condensed matter in particular, has increased steadily worldwide. This, to a large extent, is a result of the availability of the much brighter third-generation light sources, which opened up new experimental techniques. Recently, new developments in accelerator technology are paving the way for even brighter sources, which are being named fourth-generation light sources. Sirius, the future new Brazilian synchrotron, is one of the first two such machines being currently constructed in the world. Its first light is expected by 2018. It is being planned to be a state of the art machine, providing tools for cutting edge research that are non existent today in Brazil. It is a project designed and executed by the Laboratório Nacional de Luz Síncrotron - LNLS, which was also responsible for the construction of the current second generation Brazilian light source, the first synchrotron in the southern hemisphere, still the only one in Latin America. In this talk an overview of the status of Sirius will be provided.

  11. Upgraded X-ray topography and microtomography beamline at the Kurchatov synchrotron radiation source

    SciTech Connect

    Senin, R. A. Khlebnikov, A. S.; Vyazovetskova, A. E.; Blinov, I. A.; Golubitskii, A. O.; Kazakov, I. V.; Vorob'ev, A. A.; Buzmakov, A. V.; Asadchikov, V. E.; Shishkov, V. A.; Mukhamedzhanov, E. Kh.; Kovalchuk, M. V.

    2013-05-15

    An upgraded X-ray Topography and Microtomography (XRT-MT) station is described, the parameters of the optical schemes and detectors are given, and the experimental possibilities of the station are analyzed. Examples of tomographic reconstructions are reported which demonstrate spatial resolutions of 2.5 and 10 {mu}m at fields of view of 2.5 and 10 mm, respectively.

  12. The Los Alamos National Laboratory Chemistry and Metallurgy Research Facility upgrades project - A model for waste minimization

    SciTech Connect

    Burns, M.L.; Durrer, R.E.; Kennicott, M.A.

    1996-07-01

    The Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently undergoing a major, multi-year construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D&D) job and are identical to the requirements of any of several upgrades projects anticipated for LANL and other Department of Energy (DOE) sites. For these reasons the CMR Upgrades Project is seen as an ideal model facility - to test the application, and measure the success of - waste minimization techniques which could be brought to bear on any of the similar projects. The purpose of this paper will be to discuss the past, present, and anticipated waste minimization applications at the facility and will focus on the development and execution of the project`s {open_quotes}Waste Minimization/Pollution Prevention Strategic Plan.{close_quotes}

  13. Detection of Power Grid Harmonic Pollution Sources based on Upgraded Power Meters

    NASA Astrophysics Data System (ADS)

    Petković, Predrag; Stevanović, Dejan

    2014-05-01

    The paper suggests a new and efficient method for location of nonlinear loads on a grid. It is based on measuring of distortion power. The paper reviews different definitions of distortion power and proves that the method is feasible independently on particular definition. The obtained results of simulation and measurement confirm the effectiveness and applicability of the method. The proposed solution is suitable for software update of existing electronic power-meters or can be implement as hardware upgrade.

  14. Upgrade of a Theta Pinch Plasma Source for Energetic Plasma Flow Generation

    NASA Astrophysics Data System (ADS)

    Jung, Soonwook; Andruczyk, Daniel; Ruzic, David; CenterPlasma-Material Interactions Team

    2011-10-01

    DEVeX is a theta pinch device used to investigate fusion-related material interaction such as vapor shielding and ICRF antenna interactions with plasma-pulses in a laboratory setting. However, recent upgrades of the device indicate that guiding magnet and crowbar operation hinder plasma flow to the target when the magnetic field at the theta coil is reversed from that of the guiding magnet. This reversal occurs mainly due to finite inductance and resistance at the crowbar switch. Therefore, an upgrade for more suitable fusion-related material study is required. In this study, several upgrades to produce higher-temperature plasma have been carried out. Major modification of theta coil is carried out and its effects on plasma parameters are theoretically predicted with simulation. The results will be compared with experiments including voltage/current measurement at the coil, plasma parameter measurement with triple Langmuir probe and time of flight technique, and incident energy measurement with thermocouples. The research reported in this paper was performed in support of Contract number DE-FG02-04ER54765 with the U.S. Department of Energy and Oak Ridge National Laboratory.

  15. The Upgrade Project at Texas A and M University Cyclotron Institute: Update

    SciTech Connect

    Tabacaru, G.; Abegglen, F.; Chubaryan, G.; Derrig, G.; Clark, H. L.; Kim, G.; May, D.; Tribble, R. E.; Aerje, J.

    2010-11-24

    The Cyclotron Institute at Texas A and M University is currently under an upgrade process. The plan is to produce re-accelerated radioactive ion beams using the recommissioned 88'' Cyclotron as a driver and two different devices. The technique for producing radioactive species will be presented.

  16. Multi-objective direct optimization of dynamic acceptance and lifetime for potential upgrades of the Advanced Photon Source.

    SciTech Connect

    Borland, M.; Sajaev, V.; Emery, L.; Xiao, A.; Accelerator Systems Division

    2010-08-24

    The Advanced Photon Source (APS) is a 7 GeV storage ring light source that has been in operation for well over a decade. In the near future, the ring may be upgraded, including changes to the lattice such as provision of several long straight sections (LSS). Because APS beamlines are nearly fully built out, we have limited freedom to place LSSs in a symmetric fashion. Arbitrarily-placed LSSs will drastically reduce the symmetry of the optics and would typically be considered unworkable. We apply a recently-developed multi-objective direct optimization technique that relies on particle tracking to compute the dynamic aperture and Touschek lifetime. We show that this technique is able to tune sextupole strengths and select the working point in such a way as to recover the dynamic and momentum acceptances. We also show the results of experimental tests of lattices developed using these techniques.

  17. Beam Physics for the 12 GeV CEBAF Upgrade Project

    SciTech Connect

    L. Merminga; J. F. Benesch; S.A. Bogacz; Y.-C. Chao; A. Freyberger; J.M. Grames; L. Harwood; R. Kazimi; G.A. Krafft; M. Spata; M. Tiefenback; M. Wiseman; B.C. Yunn; Y. Zhang

    2005-05-16

    Beam physics aspects of the 12 GeV Upgrade of CEBAF are presented. The CEBAF Upgrade to 12 GeV is achieved via 5.5 recirculations through the linacs, and the installation of 10 new high-gradient cryomodules. A new experimental hall, Hall D, is envisioned at the end of North Linac. Simulation results for straight-through and recirculated injectors are summarized and compared. Beam transport designs are discussed and evaluated with respect to matching and beam breakup (BBU) optimization. Effects of synchrotron radiation excitation on the beam properties are calculated. BBU simulations and derived specifications for the damping of higher order modes of the new 7-cell cavities are presented. The energies that provide longitudinal polarization in multiple experimental halls simultaneously are calculated. Finally, a detailed optics design for the Hall D transport line has been obtained.

  18. Radiation hardness of two CMOS prototypes for the ATLAS HL-LHC upgrade project.

    NASA Astrophysics Data System (ADS)

    Huffman, B. T.; Affolder, A.; Arndt, K.; Bates, R.; Benoit, M.; Di Bello, F.; Blue, A.; Bortoletto, D.; Buckland, M.; Buttar, C.; Caragiulo, P.; Das, D.; Dopke, J.; Dragone, A.; Ehrler, F.; Fadeyev, V.; Galloway, Z.; Grabas, H.; Gregor, I. M.; Grenier, P.; Grillo, A.; Hoeferkamp, M.; Hommels, L. B. A.; John, J.; Kanisauskas, K.; Kenney, C.; Kramberger, J.; Liang, Z.; Mandić, I.; Maneuski, D.; Martinez-Mckinney, F.; McMahon, S.; Meng, L.; Mikuž, M.; Muenstermann, D.; Nickerson, R.; Perić, I.; Phillips, P.; Plackett, R.; Rubbo, F.; Segal, J.; Seidel, S.; Seiden, A.; Shipsey, I.; Song, W.; Stanitzki, M.; Su, D.; Tamma, C.; Turchetta, R.; Vigani, L.; Volk, J.; Wang, R.; Warren, M.; Wilson, F.; Worm, S.; Xiu, Q.; Zhang, J.; Zhu, H.

    2016-02-01

    The LHC luminosity upgrade, known as the High Luminosity LHC (HL-LHC), will require the replacement of the existing silicon strip tracker and the transistion radiation tracker. Although a baseline design for this tracker exists the ATLAS collaboration and other non-ATLAS groups are exploring the feasibility of using CMOS Monolithic Active Pixel Sensors (MAPS) which would be arranged in a strip-like fashion and would take advantage of the service and support structure already being developed for the upgrade. Two test devices made with the AMS H35 process (a High voltage or HV CMOS process) have been subjected to various radiation environments and have performed well. The results of these tests are presented in this paper.

  19. Upgrade of the radio frequency quadrupole cooler and buncher for the HIE-ISOLDE project

    NASA Astrophysics Data System (ADS)

    Babcock, Carla; Giles, Tim

    2013-12-01

    The upgrade to the ISOLDE facility, HIE-ISOLDE, will include an upgrade to the RFQCB (radio frequency quadrupole cooler and buncher), the focus of which will be fixing the problems of alignment with the current machine, improving the integrity of the vacuum system, stabilizing the internal gas pressure, and the changes associated with a new position. The beam passage inside the RFQCB has been simulated with an independent code to highlight the importance of the internal gas pressure, to motivate design changes in the new RFQCB and to explain ways to improve the performance of the current machine. The suspected misalignment of ISCOOL has been quantified, and, using a simulation of ions passing through the external injection electrodes, the effect of the misalignment on machine acceptance has been detailed. Plans for the future RFQCB test stand and HIE-ISOLDE installation have been outlined.

  20. The SAMI2 Open Source Project

    NASA Astrophysics Data System (ADS)

    Huba, J. D.; Joyce, G.

    2001-05-01

    In the past decade, the Open Source Model for software development has gained popularity and has had numerous major achievements: emacs, Linux, the Gimp, and Python, to name a few. The basic idea is to provide the source code of the model or application, a tutorial on its use, and a feedback mechanism with the community so that the model can be tested, improved, and archived. Given the success of the Open Source Model, we believe it may prove valuable in the development of scientific research codes. With this in mind, we are `Open Sourcing' the low to mid-latitude ionospheric model that has recently been developed at the Naval Research Laboratory: SAMI2 (Sami2 is Another Model of the Ionosphere). The model is comprehensive and uses modern numerical techniques. The structure and design of SAMI2 make it relatively easy to understand and modify: the numerical algorithms are simple and direct, and the code is reasonably well-written. Furthermore, SAMI2 is designed to run on personal computers; prohibitive computational resources are not necessary, thereby making the model accessible and usable by virtually all researchers. For these reasons, SAMI2 is an excellent candidate to explore and test the open source modeling paradigm in space physics research. We will discuss various topics associated with this project. Research supported by the Office of Naval Research.

  1. Choice of a process design for simultaneous detritiation and upgrading of heavy water for the Advanced Neutron Source

    SciTech Connect

    Miller, A.I.; Spagnolo, D.A.; DeVore, J.R.

    1995-11-01

    Tritium removal and heavy water upgrading are essential components of the heavy water-moderated reactor that is the heart of the Advanced Neutron Source (ANS) to be built at Oak Ridge National Laboratory. The technologies for these two processes, which are closely related, are reviewed in the context of the ANS requirements. The evolution of the design of the Heavy Water Upgrading and Detritiation Facility (HWUDF) for ANS is outlined, and the final conceptual design is presented. The conceptual design of HWUDF has two main component systems: (a) a front-end combined electrolysis and catalytic exchange (CECE) system and (b) a back-end cryogenic distillation (CD) system. The CECE process consists of a countercurrent exchange column for hydrogen-water exchange over a wetproofed catalyst and electrolysis to convert water into hydrogen. It accepts all the tritiated heavy water streams of the reactor and performs an almost total separation into a protium (light hydrogen) stream containing tritium and deuterium at only natural abundance and a deuterium stream containing all the tritium and almost no protium. The tritium-containing deuterium stream is then processed by a CD unit, which removes over 90% of the tritium and concentrates it to >99% tritium for indefinite storage as a metal tritide. Deuterium gas with a small residue of tritium is recombined with oxygen from the electrolytic cells and returned as heavy water to the reactor.

  2. Applications of ECH on the DIII-D tokamak and projections for future ECH upgrades

    NASA Astrophysics Data System (ADS)

    Prater, R.; Buttery, R. J.; DeBoo, J.; Ferron, J. R.; Garofalo, A.; Holcomb, C. T.; Jackson, G. L.; La Haye, R. J.; Lohr, J. M.; Luce, T. C.; Petty, C. C.; Politzer, P. A.; Solomon, W. M.; Turco, F.

    2012-09-01

    Electron Cyclotron Heating and Current Drive plays an important role in the DIII-D program. In high performance discharges EC power contributes greatly to MHD stability, and this is particularly important for discharges with low rotational torque applied, as will be the case for ITER. Off-axis EC current drive also plays a key role in the actualization of steady-state scenarios by supporting the desired current profile. In order to carry out these applications at higher beta and higher field, an upgrade of the EC power to 15 MW is needed, and the best gyrotron frequency for the DIII-D program is 117.5 GHz.

  3. Development of electron beam ion source charge breeder for rare isotopes at Californium Rare Isotope Breeder Upgrade

    SciTech Connect

    Kondrashev, S.; Dickerson, C.; Levand, A.; Ostroumov, P. N.; Pardo, R. C.; Savard, G.; Vondrasek, R.; Alessi, J.; Beebe, E.; Pikin, A.; Kuznetsov, G. I.; Batazova, M. A.

    2012-02-15

    Recently, the Californium Rare Isotope Breeder Upgrade (CARIBU) to the Argonne Tandem Linac Accelerator System (ATLAS) was commissioned and became available for production of rare isotopes. Currently, an electron cyclotron resonance ion source is used as a charge breeder for CARIBU beams. To further increase the intensity and improve the purity of neutron-rich ion beams accelerated by ATLAS, we are developing a high-efficiency charge breeder for CARIBU based on an electron beam ion source (EBIS). The CARIBU EBIS charge breeder will utilize the state-of-the-art EBIS technology recently developed at Brookhaven National Laboratory (BNL). The electron beam current density in the CARIBU EBIS trap will be significantly higher than that in existing operational charge-state breeders based on the EBIS concept. The design of the CARIBU EBIS charge breeder is nearly complete. Long-lead components of the EBIS such as a 6-T superconducting solenoid and an electron gun have been ordered with the delivery schedule in the fall of 2011. Measurements of expected breeding efficiency using the BNL Test EBIS have been performed using a Cs{sup +} surface ionization ion source for external injection in pulsed mode. In these experiments we have achieved {approx}70% injection/extraction efficiency and breeding efficiency into the most abundant charge state of {approx}17%.

  4. Development of electron beam ion source charge breeder for rare isotopes at Californium Rare Isotope Breeder Upgrade

    SciTech Connect

    Kondrashev S.; Alessi J.; Dickerson, C.; Levand, A.; Ostroumov, P.N.; Pardo, R.C.; Savard, G.; Vondrasek, R.; Beebe, E.; Pikin, A.; Kuznetsov, G.I.; Batazova, M.A.

    2012-02-03

    Recently, the Californium Rare Isotope Breeder Upgrade (CARIBU) to the Argonne Tandem Linac Accelerator System (ATLAS) was commissioned and became available for production of rare isotopes. Currently, an electron cyclotron resonance ion source is used as a charge breeder for CARIBU beams. To further increase the intensity and improve the purity of neutron-rich ion beams accelerated by ATLAS, we are developing a high-efficiency charge breeder for CARIBU based on an electron beam ion source (EBIS). The CARIBU EBIS charge breeder will utilize the state-of-the-art EBIS technology recently developed at Brookhaven National Laboratory (BNL). The electron beam current density in the CARIBU EBIS trap will be significantly higher than that in existing operational charge-state breeders based on the EBIS concept. The design of the CARIBU EBIS charge breeder is nearly complete. Long-lead components of the EBIS such as a 6-T superconducting solenoid and an electron gun have been ordered with the delivery schedule in the fall of 2011. Measurements of expected breeding efficiency using the BNL Test EBIS have been performed using a Cs{sup +} surface ionization ion source for external injection in pulsed mode. In these experiments we have achieved {approx}70% injection/extraction efficiency and breeding efficiency into the most abundant charge state of {approx}17%.

  5. Performance and upgrades of the NSLS storage rings and photon sources

    SciTech Connect

    Not Available

    1991-01-01

    The usefulness of synchrotron radiation sources is not only determined by current, energy and magnetic field but also orbit stability and lifetime. The status and developments at NSLS in storage ring performance are discussed. Efforts at NSLS to look toward the future in source development are presented. In particular, small gap undulator development and studies toward development of UV Free Electron Laser at the Accelerator Test Facility are described. 5 refs., 2 figs., 1 tab.

  6. Performance and upgrades of the NSLS storage rings and photon sources

    SciTech Connect

    Not Available

    1991-12-31

    The usefulness of synchrotron radiation sources is not only determined by current, energy and magnetic field but also orbit stability and lifetime. The status and developments at NSLS in storage ring performance are discussed. Efforts at NSLS to look toward the future in source development are presented. In particular, small gap undulator development and studies toward development of UV Free Electron Laser at the Accelerator Test Facility are described. 5 refs., 2 figs., 1 tab.

  7. Pleasant Prairie Power Plant air quality control upgrade project, Pleasant Praire, Wisconsin

    SciTech Connect

    Gebhart, S.; Pennline, D.; Brodsky, I.; Bichler, D.

    2007-10-15

    We Energies recently completed a multiyear project at its Pleasant Prairie Power Plant to add a selective catalytic reduction system to one of its two units and a scrubber to both. These projects are described. 7 figs., 1 tab.

  8. D0 Solenoid Upgrade Project: Heat Load Calculations for the Solenoid Chimney

    SciTech Connect

    Rucinski, R.; /Fermilab

    1993-05-26

    This engineering note documents the calculations done to determine the chimney heat loads. These heat load numbers were reported in the D0 solenoid upgrade design report. The heat loads to the LN2 circuit were done by Andrew Stefanik, RDIMechanical Systems group. They were part of his LN2 shield calculations dated 2/23/93. Pages 1 thru 3 of his calculations that apply to the chimney are attached. The heat loads to the LHe circuit were done originally on 12/16/92 and then revised on 12/23/92 to be more conservative. The raw calculations are attached. I include both the original 12/16 version and the 12/23 revised version to document the amount of conservativeness added.

  9. D0 Solenoid Upgrade Project: Thermal Contraction Analysis for the D0 Solenoid Chimney

    SciTech Connect

    Rucinski, R.; /Fermilab

    1993-09-30

    This engineering note documents the thermal contraction analysis that was done for the D-Zero solenoid chimney. The analysis was done as support of the 'Design Report of the 2 Tesla Superconducting Solenoid for the Fermilab DO Detector upgrade.' The cryogenic LHE and LN2 lines were analyzed for combined pressure, thermal movement, and dead weight. The tubing was stress analyzed per ASME code for Pressure Piping, standard ANSI AS:ME B31.3, for eight combinations ofthermal loading. A commercial pipe stress analysis and design system by Algor{reg_sign} was used for the analysis. Stresses calculated were well below allowables. Based on the analysis, the cryogenic lines will be installed at an offset from the vacuum jacket centerline so that during steady state cold operation, the cryogenic lines will be in a proper location.

  10. Nb$_3$Sn High Field Magnets for the High Luminosity LHC Upgrade Project

    SciTech Connect

    Ambrosio, Giorgio

    2015-01-01

    The High Luminosity upgrade of the Large Hadron Collider at CERN requires a new generation of high field superconducting magnets. High field large aperture quadrupoles (MQXF) are needed for the low-beta triplets close to the ATLAS and CMS detectors, and high field two-in-one dipoles (11 T dipoles) are needed to make room for additional collimation. The MQXF quadrupoles, with a field gradient of 140 T/m in 150 mm aperture, have a peak coil field of 12.1 T at nominal current. The 11 T dipoles, with an aperture of 60 mm, have a peak coil field of 11.6 T at nominal current. Both magnets require Nb3Sn conductor and are the first applications of this superconductor to actual accelerator magnets.

  11. Tapping upgrade potential

    SciTech Connect

    Gill, H.S. )

    1993-01-01

    Modernizing aging hydropower stations presents plant owners with a unique opportunity for improving efficiency and plant output. But several factors should be considered before undertaking a turbine upgrade project.

  12. High power switch design for the Nova upgrade laser (Project Hercules). Final report, August 15, 1991--May 31, 1993

    SciTech Connect

    Giesselmann, M.

    1993-12-31

    A test facility has been constructed to test high power ignitrons using an electrolytic bank. The goal of this project, which was named Hercules (High Energy Research Concerning the Ultimate Lifetime of Experimental Switches), was to test the lifetime and switching characteristics of high power ignitrons for Lawrence Livermore`s laser upgrade program. The main tubes of interest that have been tested were the NL-9000A from Richardson Electronics, and the BK-1002 from English Electric Valve (EEV). Both tubes have stainless steel, cup style anodes. Both tubes were connected in series for the tests. Required test parameters were Ipeak = 300 kA, and Qtransfer = 200 C. During the tests, the BK-1002 tube failed due to ignitor shorting. The average forward voltage drop across the EEV tube was almost twice than the drop across the NL-9000A. After the tube failure, the BK-1002 was replaced by a NL-1057 to continue testing of the NL-9000A.

  13. A study of clinically related open source software projects.

    PubMed

    Hogarth, Michael A; Turner, Stuart

    2005-01-01

    Open source software development has recently gained significant interest due to several successful mainstream open source projects. This methodology has been proposed as being similarly viable and beneficial in the clinical application domain as well. However, the clinical software development venue differs significantly from the mainstream software venue. Existing clinical open source projects have not been well characterized nor formally studied so the 'fit' of open source in this domain is largely unknown. In order to better understand the open source movement in the clinical application domain, we undertook a study of existing open source clinical projects. In this study we sought to characterize and classify existing clinical open source projects and to determine metrics for their viability. This study revealed several findings which we believe could guide the healthcare community in its quest for successful open source clinical software projects. PMID:16779056

  14. Electronics/Robotics Displaced Worker Retraining and Technician Upgrade Training. Ohlone College Investment in People Project 1983-84. Evaluation Report.

    ERIC Educational Resources Information Center

    Moock, Lynn D.

    An evaluator studied the effectiveness of the displaced worker entry-level and the upgrade components of the electronics/robotics training program. Since the program was a pilot project with attendant trials and errors, a user-focused process of evaluation was selected. Entry-level students, administrators, the counselor, and instructors completed…

  15. End of Project Report [Upgrading measurement capabilities for hydrocarbons, halocarbons and alkyl nitrates

    NASA Technical Reports Server (NTRS)

    Blake, Donald R.

    1999-01-01

    This paper presents the End of Project Report from the P3-B Christmas Island local flights. Altitudinal variations in mixing ratios of several marine emitted gases, including DMS (dimethyl sulfide) are illustrated. This paper is presented in viewgraph form.

  16. GenomewidePDB 2.0: A Newly Upgraded Versatile Proteogenomic Database for the Chromosome-Centric Human Proteome Project.

    PubMed

    Jeong, Seul-Ki; Hancock, William S; Paik, Young-Ki

    2015-09-01

    Since the launch of the Chromosome-centric Human Proteome Project (C-HPP) in 2012, the number of "missing" proteins has fallen to 2932, down from ∼5932 since the number was first counted in 2011. We compared the characteristics of missing proteins with those of already annotated proteins with respect to transcriptional expression pattern and the time periods in which newly identified proteins were annotated. We learned that missing proteins commonly exhibit lower levels of transcriptional expression and less tissue-specific expression compared with already annotated proteins. This makes it more difficult to identify missing proteins as time goes on. One of the C-HPP goals is to identify alternative spliced product of proteins (ASPs), which are usually difficult to find by shot-gun proteomic methods due to their sequence similarities with the representative proteins. To resolve this problem, it may be necessary to use a targeted proteomics approach (e.g., selected and multiple reaction monitoring [S/MRM] assays) and an innovative bioinformatics platform that enables the selection of target peptides for rarely expressed missing proteins or ASPs. Given that the success of efforts to identify missing proteins may rely on more informative public databases, it was necessary to upgrade the available integrative databases. To this end, we attempted to improve the features and utility of GenomewidePDB by integrating transcriptomic information (e.g., alternatively spliced transcripts), annotated peptide information, and an advanced search interface that can find proteins of interest when applying a targeted proteomics strategy. This upgraded version of the database, GenomewidePDB 2.0, may not only expedite identification of the remaining missing proteins but also enhance the exchange of information among the proteome community. GenomewidePDB 2.0 is available publicly at http://genomewidepdb.proteomix.org/. PMID:26272709

  17. Upgrading in an Industrial Setting. Final Report.

    ERIC Educational Resources Information Center

    Russell, Wendell

    The project objectives were: (1) to assess existing industrial upgrading practices in an Atomic Energy Commission contractor organization, (2) to design new alternative upgrading methods, (3) to experiment with new upgrading methods, (4) to plan for utilization of proven upgrading programs, and (5) to document and disseminate activities. A twelve…

  18. Upgrading to Web 2.0: An Experiential Project to Build a Marketing Wiki

    ERIC Educational Resources Information Center

    Cronin, John J.

    2009-01-01

    Wikis are one of the newest features of Web 2.0. This article describes the implementation of a project in a marketing course in which students created an interactive textbook using wiki software. Several surprises encountered along the way are described, and the unique problem of grading individual contributions to a wiki is discussed. The author…

  19. Project W-314 specific test and evaluation plan for AZ tank farm upgrades

    SciTech Connect

    Hays, W.H.

    1998-08-12

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.

  20. Status of the Short-Pulse X-ray Project at the Advanced Photon Source

    SciTech Connect

    Nassiri, A; Berenc, T G; Borland, M; Brajuskovic, B; Bromberek, D J; Carwardine, J; Decker, G; Emery, L; Fuerst, J D; Grelick, A E; Horan, D; Kaluzny, J; Lenkszus, F; Lill, R M; Liu, J; Ma, H; Sajaev, V; Smith, T L; Stillwell, B K; Waldschmidt, G J; Wu, G; Yang, B X; Yang, Y; Zholents, A; Byrd, J M; Doolittle, L R; Huang, G; Cheng, G; Ciovati, G; Dhakal, P; Eremeev, G V; Feingold, J J; Geng, R L; Henry, J; Kneisel, P; Macha, K; Mammosser, J D; Matalevich, J; Palczewski, A D; Rimmer, R A; Wang, H; Wilson, K M; Wiseman, M; Li, Z; Xiao, L

    2012-07-01

    The Advanced Photon Source Upgrade (APS-U) Project at Argonne will include generation of short-pulse x-rays based on Zholents deflecting cavity scheme. We have chosen superconducting (SC) cavities in order to have a continuous train of crabbed bunches and flexibility of operating modes. In collaboration with Jefferson Laboratory, we are prototyping and testing a number of single-cell deflecting cavities and associated auxiliary systems with promising initial results. In collaboration with Lawrence Berkeley National Laboratory, we are working to develop state-of-the-art timing, synchronization, and differential rf phase stability systems that are required for SPX. Collaboration with Advanced Computations Department at Stanford Linear Accelerator Center is looking into simulations of complex, multi-cavity geometries with lower- and higher-order modes waveguide dampers using ACE3P. This contribution provides the current R&D status of the SPX project.

  1. Advanced Neutron Source (ANS) Project progress report

    SciTech Connect

    McBee, M.R.; Chance, C.M. ); Selby, D.L.; Harrington, R.M.; Peretz, F.J. )

    1990-04-01

    This report discusses the following topics on the advanced neutron source: quality assurance (QA) program; reactor core development; fuel element specification; corrosion loop tests and analyses; thermal-hydraulic loop tests; reactor control concepts; critical and subcritical experiments; material data, structural tests, and analysis; cold source development; beam tube, guide, and instrument development; hot source development; neutron transport and shielding; I C research and development; facility concepts; design; and safety.

  2. IR fiber sources for scene projection

    NASA Astrophysics Data System (ADS)

    Shaw, L. B.; Sanghera, J. S.; Aggarwal, I. D.

    2007-04-01

    Naval Research Laboratory has developed IR transmitting fiber and IR fiber sources which can be used for HWIL testing. IR transmitting fiber is capable of broad transmission from near IR to LWIR and can be formed into bundles for imaging. IR fiber sources are based on rare earth doped glass or nonlinear processes in the glass and are cable of high brightness IR emission. Recently, NRL developed a four emitter MWIR fiber source which is capable of high temperature simulation, high dynamic range, and fast response. New broadband fiber sources based upon IR supercontinuum generation in IR fibers are also being developed. In this paper, we will report on these technologies.

  3. Skill Upgrading, Incorporated. Final Report.

    ERIC Educational Resources Information Center

    Skill Upgrading, Inc., Baltimore, MD.

    As in two other projects in Cleveland and Newark, New Jersey, this project was set up in Baltimore to provide technical assistance in designing ways to meet in-plant skills needs by upgrading job skills on entry workers through High Intensity Training (HIT). Skill Upgrading, Inc. was established in Maryland to provide training and manpower…

  4. Final Report and Evaluation of Project S.P.R.U.C.E. (Science Project Related to Upgrading Conservation Education).

    ERIC Educational Resources Information Center

    Busch, Phyllis S.

    Presented is an environmental approach to elementary school science teaching. The inquiry approach is stressed and outdoor activities are integrated with classroom activities. A variety of curricular materials were developed to be used in conjunction with the New York State Elementary Science Curriculum. The project also provided workshops for…

  5. GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project

    SciTech Connect

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-09-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

  6. GENII: The Hanford Environmental Radiation Dosimetry Software System: Volume 2, Users' manual: Hanford Environmental Dosimetry Upgrade Project

    SciTech Connect

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-11-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). The purpose of this coupled system of computer codes is to analyze environmental contamination of, air, water, or soil. This is accomplished by calculating radiation doses to individuals or populations. GENII is described in three volumes of documentation. This second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. The first volume describes the theoretical considerations of the system. The third volume is a Code Maintenance Manual for the user who requires knowledge of code detail. It includes logic diagrams, global dictionary, worksheets, example hand calculations, and listings of the code and its associated data libraries. 27 refs., 17 figs., 23 tabs.

  7. A Simulation of the Front End Signal Digitization for the ATLAS Muon Spectrometer thin RPC trigger upgrade project

    NASA Astrophysics Data System (ADS)

    Meng, Xiangting; Chapman, John; Levin, Daniel; Dai, Tiesheng; Zhu, Junjie; Zhou, Bing; Um Atlas Group Team

    2016-03-01

    The ATLAS Muon Spectrometer Phase-I (and Phase-II) upgrade includes the BIS78 muon trigger detector project: two sets of eight very thin Resistive Place Chambers (tRPCs) combined with small Monitored Drift Tube (MDT) chambers in the pseudorapidity region 1<| η|<1.3. The tRPCs will be comprised of triplet readout layer in each of the eta and azimuthal phi coordinates, with about 400 readout strips per layer. The anticipated hit rate is 100-200 kHz per strip. Digitization of the strip signals will be done by 32-channel CERN HPTDC chips. The HPTDC is a highly configurable ASIC designed by the CERN Microelectronics group. It can work in both trigger and trigger-less modes, be readout in parallel or serially. For Phase-I operation, a stringent latency requirement of 43 bunch crossings (1075 ns) is imposed. The latency budget for the front end digitization must be kept to a minimal value, ideally less than 350 ns. We conducted detailed HPTDC latency simulations using the Behavioral Verilog code from the CERN group. We will report the results of these simulations run for the anticipated detector operating environment and for various HPTDC configurations.

  8. Operating test report for project W-417, T-plant steam removal upgrade, waste transfer portion

    SciTech Connect

    Myers, N.K.

    1997-10-21

    This Operating Test Report (OTR) documents the performance results of the Operating Test Procedure HNF-SD-W417-OTP-001 that provides steps to test the waste transfer system installed in the 221-T Canyon under project W-417. Recent modifications have been performed on the T Plant Rail Car Waste Transfer System. This Operating Test Procedure (OTP) will document the satisfactory operation of the 221-T Rail Car Waste Transfer System modified by project W-417. Project W-417 installed a pump in Tank 5-7 to replace the steam jets used for transferring liquid waste. This testing is required to verify that operational requirements of the modified transfer system have been met. Figure 2 and 3 shows the new and existing system to be tested. The scope of this testing includes the submersible air driven pump operation in Tank 5-7, liquid waste transfer operation from Tank 5-7 to rail car (HO-IOH-3663 or HO-IOH-3664), associated line flushing, and the operation of the flow meter. This testing is designed to demonstrate the satisfactory operation-of the transfer line at normal operating conditions and proper functioning of instruments. Favorable results will support continued use of this system for liquid waste transfer. The Functional Design Criteria for this system requires a transfer flow rate of 40 gallons per minute (GPM). To establish these conditions the pump will be supplied up to 90 psi air pressure from the existing air system routed in the canyon. An air regulator valve will regulate the air pressure. Tank capacity and operating ranges are the following: Tank No. Capacity (gal) Operating Range (gal) 5-7 10,046 0 8040 (80%) Rail car (HO-IOH-3663 HO-IOH-3664) 097219,157 Existing Tank level instrumentation, rail car level detection, and pressure indicators will be utilized for acceptance/rejection Criteria. The flow meter will be verified for accuracy against the Tank 5-7 level indicator. The level indicator is accurate to within 2.2 %. This will be for information only

  9. The Open Source Teaching Project (OSTP): Research Note.

    ERIC Educational Resources Information Center

    Hirst, Tony

    The Open Source Teaching Project (OSTP) is an attempt to apply a variant of the successful open source software approach to the development of educational materials. Open source software is software licensed in such a way as to allow anyone the right to modify and use it. From such a simple premise, a whole industry has arisen, most notably in the…

  10. A time projection chamber for high-rate experiments: Towards an upgrade of the ALICE TPC

    NASA Astrophysics Data System (ADS)

    Ketzer, Bernhard

    2013-12-01

    A Time Projection Chamber (TPC) is a powerful detector for three-dimensional tracking and particle identification for ultra-high multiplicity events. It is the central tracking device of many experiments, e.g. of the ALICE experiment at CERN. The necessity of a switching electrostatic gate, which prevents ions produced in the amplification region of the MWPCs from entering the drift volume, however, restricts its application to trigger rates of the order of 1 kHz. Charge amplification by Gas Electron Multiplier (GEM) foils instead of proportional wires offers an intrinsic suppression of the ion backflow, although not to the same level as a gating grid. Detailed Monte Carlo simulations have shown that the distortions due to residual space charge from back-drifting ions can be limited to a few cm, and thus can be corrected using standard calibration techniques. A prototype GEM-TPC has been built with the largest active volume to date for a detector of this type. It has been commissioned with cosmic rays and with particle beams at the FOPI experiment at GSI, and was employed for a physics measurement with pion beams. For the future operation of the ALICE TPC at the CERN LHC beyond 2019, where Pb-Pb collision rates of 50 kHz are expected, it is planned to replace the existing MWPCs by GEM detectors, operated in a continuous, triggerless readout mode, thus allowing an increase in event rate by a factor of 100. As a first step of the R&D program, a prototype of an Inner Readout Chamber was equipped with large-size GEM foils and exposed to beams of protons, pions and electrons from the CERN PS. In this paper, new results are shown concerning ion backflow, spatial and momentum resolution of the FOPI GEM-TPC, detector calibration, and dE/dx resolution with both detector prototypes. The perspectives of a GEM-TPC for ALICE with continuous readout will be discussed.

  11. Student Projects as a Funding Source

    ERIC Educational Resources Information Center

    Henson, Kerry L.

    2010-01-01

    Prompted by restricted funding for a lab which supported student software development work on real-world projects, a contribution program was established to facilitate monetary support from the external clients. The paper explores the relationships between instructor, students and client and how a funding component can affect these ties.…

  12. Department of Energy review of the National Spallation Neutron Source Project

    SciTech Connect

    1997-06-01

    A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic.

  13. Operational Lessons from a Strategic Sourcing Project

    ERIC Educational Resources Information Center

    Krob, Adam

    2008-01-01

    Sourcing decisions for information services departments have become an integral part of every school's IT strategy. Much has been written on what areas to outsource, which partner to select, and how to negotiate contracts and service agreements. In this article, the author shares the operational lessons learned by Tulane University during the…

  14. Status of the Short-Pulse X-ray Project (SPX) at the Advanced Photon Source (APS)

    SciTech Connect

    Nassiri, R; Berenc, G; Borland, M; Bromberek, D J; Chae, Y -C; Decker, G; Emery, L; Fuerst, J D; Grelick, A E; Horan, D; Lenkszus, F; Lill, R M; Sajaev, V; Smith, T L; Waldschmidt, G J; Wu, G; Yang, B X; Zholents, A; Byrd, J M; Doolittle, L R; Huang, G; Cheng, G; Ciovati, G; Henry, J; Kneisel, P; Mammosser, J D; Rimmer, R A; Turlington, L

    2011-03-01

    The Advanced Photon Source Upgrade project (APS-U) at Argonne includes implementation of Zholents’* deflecting cavity scheme for production of short x-ray pulses. This is a joint project between Argonne National Laboratory, Thomas Jefferson National Laboratory, and Lawrence Berkeley National Laboratory. This paper describes performance characteristics of the proposed source and technical issues related to its realization. Ensuring stable APS storage ring operation requires reducing quality factors of these modes by many orders of magnitude. These challenges reduce to those of the design of a single-cell SC cavity that can achieve the desired operating deflecting fields while providing needed damping of all these modes. The project team is currently prototyping and testing several promising designs for single-cell cavities with the goal of deciding on a winning design in the near future. Here

  15. Source localization using recursively applied and projected (RAP) MUSIC

    SciTech Connect

    Mosher, J.C.; Leahy, R.M.

    1998-03-01

    A new method for source localization is described that is based on a modification of the well known multiple signal classification (MUSIC) algorithm. In classical MUSIC, the array manifold vector is projected onto an estimate of the signal subspace, but errors in the estimate can make location of multiple sources difficult. Recursively applied and projected (RAP) MUSIC uses each successively located source to form an intermediate array gain matrix, and projects both the array manifold and the signal subspace estimate into its orthogonal complement. The MUSIC projection is then performed in this reduced subspace. Using the metric of principal angles, the authors describe a general form of the RAP-MUSIC algorithm for the case of diversely polarized sources. Through a uniform linear array simulation, the authors demonstrate the improved Monte Carlo performance of RAP-MUSIC relative to MUSIC and two other sequential subspace methods, S and IES-MUSIC.

  16. 4. Photographic copy of photograph (Source: Salt River Project Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photographic copy of photograph (Source: Salt River Project Archives, Lubken collection, R#-366) View looking north at power plant and transformer house. December 1. 1909. - Theodore Roosevelt Dam, Power Plant, Salt River, Tortilla Flat, Maricopa County, AZ

  17. 10. Photographic copy of photograph (Source: Salt River Project Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photographic copy of photograph (Source: Salt River Project Archives, Box 8046, File 13) View of power plant and transformer house. Looking northeast. No date. Post 1924. - Theodore Roosevelt Dam, Power Plant, Salt River, Tortilla Flat, Maricopa County, AZ

  18. Integrating HCI Specialists into Open Source Software Development Projects

    NASA Astrophysics Data System (ADS)

    Hedberg, Henrik; Iivari, Netta

    Typical open source software (OSS) development projects are organized around technically talented developers, whose communication is based on technical aspects and source code. Decision-making power is gained through proven competence and activity in the project, and non-technical end-user opinions are too many times neglected. In addition, also human-computer interaction (HCI) specialists have encountered difficulties in trying to participate in OSS projects, because there seems to be no clear authority and responsibility for them. In this paper, based on HCI and OSS literature, we introduce an extended OSS development project organization model that adds a new level of communication and roles for attending human aspects of software. The proposed model makes the existence of HCI specialists visible in the projects, and promotes interaction between developers and the HCI specialists in the course of a project.

  19. MINE WASTE TECHNOLOGY PROGRAM - UNDERGROUND MINE SOURCE CONTROL DEMONSTRATION PROJECT

    EPA Science Inventory

    This report presents results of the Mine Waste Technology Program Activity III, Project 8, Underground Mine Source Control Demonstration Project implemented and funded by the U. S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U. S. Department of E...

  20. Open Source Projects in Software Engineering Education: A Mapping Study

    ERIC Educational Resources Information Center

    Nascimento, Debora M. C.; Almeida Bittencourt, Roberto; Chavez, Christina

    2015-01-01

    Context: It is common practice in academia to have students work with "toy" projects in software engineering (SE) courses. One way to make such courses more realistic and reduce the gap between academic courses and industry needs is getting students involved in open source projects (OSP) with faculty supervision. Objective: This study…

  1. ELECTRON BEAM ION SOURCE PREINJECTOR PROJECT (EBIS) CONCEPTUAL DESIGN REPORT.

    SciTech Connect

    ALESSI, J.; BARTON, D.; BEEBE, E.; GASSNER, D.; ET AL.

    2005-02-28

    This report describes a new heavy ion pre-injector for the Relativistic Heavy Ion Collider (RHIC) based on a high charge state Electron Beam Ion Source (EBIS), a Radio Frequency Quadrupole (RFQ) accelerator, and a short Linac. The highly successful development of an EBIS at BNL now makes it possible to replace the present pre-injector that is based on an electrostatic Tandem with a reliable, low maintenance Linac-based pre-injector. Linac-based pre-injectors are presently used at most accelerator and collider facilities with the exception of RHIC, where the required gold beam intensities could only be met with a Tandem until the recent EBIS development. EBIS produces high charge state ions directly, eliminating the need for the two stripping foils presently used with the Tandem. Unstable stripping efficiencies of these foils are a significant source of luminosity degradation in RHIC. The high reliability and flexibility of the new Linac-based pre-injector will lead to increased integrated luminosity at RHIC and is an essential component for the long-term success of the RHIC facility. This new pre-injector, based on an EBIS, also has the potential for significant future intensity increases and can produce heavy ion beams of all species including uranium beams and, as part of a future upgrade, might also be used to produce polarized {sup 3}He beams. These capabilities will be critical to the future luminosity upgrades and electron-ion collisions in RHIC. The new RFQ and Linac that are used to accelerate beams from the EBIS to an energy sufficient for injection into the Booster are both very similar to existing devices already in operation at other facilities. Injection into the Booster will occur at the same location as the existing injection from the Tandem.

  2. Advanced Neutron Source (ANS) Project Progress report, FY 1991

    SciTech Connect

    Campbell, J.H.; Selby, D.L.; Harrington, R.M.; Thompson, P.B.

    1992-01-01

    This report discusses the following about the Advanced Neutron Source: Project Management; Research and Development; Fuel Development; Corrosion Loop Tests and Analyses; Thermal-Hydraulic Loop Tests; Reactor Control and Shutdown Concepts; Critical and Subcritical Experiments; Material Data, Structural Tests, and Analysis; Cold-Source Development; Beam Tube, Guide, and Instrument Development; Hot-Source Development; Neutron Transport and Shielding; I & C Research and Development; Design; and Safety.

  3. Advanced Neutron Source (ANS) Project Progress report, FY 1991

    SciTech Connect

    Campbell, J.H. ); Selby, D.L.; Harrington, R.M. ); Thompson, P.B. . Engineering Division)

    1992-01-01

    This report discusses the following about the Advanced Neutron Source: Project Management; Research and Development; Fuel Development; Corrosion Loop Tests and Analyses; Thermal-Hydraulic Loop Tests; Reactor Control and Shutdown Concepts; Critical and Subcritical Experiments; Material Data, Structural Tests, and Analysis; Cold-Source Development; Beam Tube, Guide, and Instrument Development; Hot-Source Development; Neutron Transport and Shielding; I C Research and Development; Design; and Safety.

  4. Harmonic Resonance Analysis for PEP II Power Factor Control Upgrades

    NASA Astrophysics Data System (ADS)

    Corvin, C.

    1997-05-01

    Recent upgrades to the high voltage utility distribution network at the Stanford Linear Accelerator Center have been accompanied by the installation of a large number of power supplies associated with the PEP-II B Factory project. These power supplies include a diverse assortment of single and three phase units, in two, six and twelve pulse configurations, with chopped, pulsed and continuous loading. Viewed as harmonic power sources in a range from a hundred to several kilohertz, they have the potential to be in resonance with the utility system network, a condition to be avoided. This paper analyzes and evaluates these resonance conditions with a view toward adding electric power factor correction upgrades to achieve substantial cost savings associated with power factor penalty avoidance. Similar studies and upgrades at SLAC in the past have reduced electric power costs over time by several hundred thousand dollars, thus providing the incentive to evaluate the recent upgrades to the PEP-II utility network.

  5. The Jülich high-brilliance neutron source project

    NASA Astrophysics Data System (ADS)

    Rücker, U.; Cronert, T.; Voigt, J.; Dabruck, J. P.; Doege, P.-E.; Ulrich, J.; Nabbi, R.; Beßler, Y.; Butzek, M.; Büscher, M.; Lange, C.; Klaus, M.; Gutberlet, T.; Brückel, T.

    2016-01-01

    With the construction of the European Spallation Source ESS, the European neutron user community is looking forward to the brightest source worldwide. At the same time there is an ongoing concentration of research with neutrons to only a few but very powerful neutron facilities. Responding to this situation the Jülich Centre for Neutron Science has initiated a project for a compact accelerator driven high-brilliance neutron source, optimized for neutron scattering on small samples and to be realized at reasonable costs. The project deals with the optimization of potential projectiles, target and moderator concepts, versatile accelerator systems, cold sources, beam extraction systems and optimized instrumentation. A brief outline of the project, the achievements already reached, will be presented, as well as a vision for the future neutron landscape in Europe.

  6. Production, formation, and transport of high-brightness atomic hydrogen beam studies for the relativistic heavy ion collider polarized source upgrade

    SciTech Connect

    Kolmogorov, A. Stupishin, N.; Atoian, G.; Ritter, J.; Zelenski, A.; Davydenko, V.; Ivanov, A.

    2014-02-15

    The RHIC polarized H{sup −} ion source had been successfully upgraded to higher intensity and polarization by using a very high brightness fast atomic beam source developed at BINP, Novosibirsk. In this source the proton beam is extracted by a four-grid multi-aperture ion optical system and neutralized in the H{sub 2} gas cell downstream from the grids. The proton beam is extracted from plasma emitter with a low transverse ion temperature of ∼0.2 eV which is formed by plasma jet expansion from the arc plasma generator. The multi-hole grids are spherically shaped to produce “geometrical” beam focusing. Proton beam formation and transport of atomic beam were experimentally studied at test bench.

  7. Production, formation, and transport of high-brightness atomic hydrogen beam studies for the relativistic heavy ion collider polarized source upgrade.

    PubMed

    Kolmogorov, A; Atoian, G; Davydenko, V; Ivanov, A; Ritter, J; Stupishin, N; Zelenski, A

    2014-02-01

    The RHIC polarized H(-) ion source had been successfully upgraded to higher intensity and polarization by using a very high brightness fast atomic beam source developed at BINP, Novosibirsk. In this source the proton beam is extracted by a four-grid multi-aperture ion optical system and neutralized in the H2 gas cell downstream from the grids. The proton beam is extracted from plasma emitter with a low transverse ion temperature of ∼0.2 eV which is formed by plasma jet expansion from the arc plasma generator. The multi-hole grids are spherically shaped to produce "geometrical" beam focusing. Proton beam formation and transport of atomic beam were experimentally studied at test bench. PMID:24593468

  8. Production, formation, and transport of high-brightness atomic hydrogen beam studies for the relativistic heavy ion collider polarized source upgrade

    NASA Astrophysics Data System (ADS)

    Kolmogorov, A.; Atoian, G.; Davydenko, V.; Ivanov, A.; Ritter, J.; Stupishin, N.; Zelenski, A.

    2014-02-01

    The RHIC polarized H- ion source had been successfully upgraded to higher intensity and polarization by using a very high brightness fast atomic beam source developed at BINP, Novosibirsk. In this source the proton beam is extracted by a four-grid multi-aperture ion optical system and neutralized in the H2 gas cell downstream from the grids. The proton beam is extracted from plasma emitter with a low transverse ion temperature of ˜0.2 eV which is formed by plasma jet expansion from the arc plasma generator. The multi-hole grids are spherically shaped to produce "geometrical" beam focusing. Proton beam formation and transport of atomic beam were experimentally studied at test bench.

  9. Upgrade of a Theta Pinch Plasma Source for Energetic Plasma Flow Generation and Fusion-Related Material Interaction Study

    NASA Astrophysics Data System (ADS)

    Jung, Soonwook; Surla, Vijay; Ruzic, David

    2010-11-01

    In order to investigate material erosion by exposure to a burst of high density plasma in a laboratory setting, a theta pinch device called the Divertor Erosion and Vapor Shielding eXperiment facility was built at UIUC. It consists of a theta-pinch coil driven by pulse discharge from 32 μF capacitor bank to produce high density plasma. Recent measurements have shown that plasma sustains approximately for 100 μs at each pulse, with 1.0 ± 0.2(10)21 /m^3 plasma density and 12.5 ± 2.5 eV electron temperature. To simulate the extreme condition in magnetic fusion device a higher electron temperature is desired. For this reason, several upgrades have been implemented: (1) the main capacitor bank, for compression and heating was operated in conjunction with RF antenna and a preionization bank. (2) a guide magnetic field was installed to transport the flow minimizing losses in the radial direction and (3) a crow-bar circuit was added to prevent the pinch from ringing and therefore working against the imposed static magnetic field. The results from the upgrades will be presented.

  10. 10 years and 20,000 sources: the offsite source recovery project

    SciTech Connect

    Whitworth, Julia R; Abeyta, Cristy L; Pearson, Michael W

    2009-01-01

    The Global Threat Reduction Initiative's (GTRI) Offsite Source Recovery Project (OSRP) has been recovering excess and unwanted sealed sources for ten years. In January 2009, GTRI announced that the project had recovered 20,000 sealed radioactive sources. This project grew out of early efforts at Los Alamos National Laboratory (LANL) to recover and disposition excess Plutonium-239 (Pu-239) sealed sources that were distributed in the 1960s and 1970s under the Atoms for Peace Program. Sealed source recovery was initially considered a waste management activity, as evidenced by its initial organization under the Department of Energy's (DOE's) Environmental Management (EM) program. After the terrorist attacks of 2001, however, the interagency community began to recognize the threat posed by excess and unwanted radiological material, particularly those that could not be disposed at the end of their useful life. After being transferred to the National Nuclear Security Administration (NNSA) to be part of GTRI, OSRP's mission was expanded to include not only material that would be classified as Greater-than-Class-C (GTCC) when it became waste, but also any other materials that might be a 'national security consideration.' This paper discusses OSRP's history, recovery operations, expansion to accept high-activity beta-gamma-emitting sealed sources and devices and foreign-possessed sources, and more recent efforts such as cooperative projects with the Council on Radiation Control Program Directors (CRCPD) and involvement in GTRI's Search and Secure project. Current challenges and future work will also be discussed.

  11. ISS Update: Computer Upgrade on Station

    NASA Video Gallery

    NASA Public Affairs Officer Brandi Dean interviews Gary Cox, EPIC Project Manager, about EPIC (Enhanced Processor and Integrated Communications), the computer upgrade program for the International ...

  12. ELECTRON BEAM ION SOURCE PREINJECTOR PROJECT (EBIS) CONCEPTUAL DESIGN REPORT.

    SciTech Connect

    ALESSI, J.; BARTON, D.; BEEBE, E.; GASSNER, D.; GRANDINETTI, R.; HSEUH, H.; JAVIDFAR, A.; KPONOU, A.; LAMBIASE, R.; LESSARD, E.; LOCKEY, R.; LODESTRO, V.; MAPES, M.; MIRABELLA, D.; NEHRING, T.; OERTER, B.; PENDZICK, A.; PIKIN, A.; RAPARIA, D.; RITTER, J.; ROSER, T.; RUSSO, T.; SNYDSTRUP, L.; WILINSKI, M.; ZALTSMAN, A.; ZHANG, S.

    2005-09-01

    This report describes a new heavy ion pre-injector for the Relativistic Heavy Ion Collider (RHIC) based on a high charge state Electron Beam Ion Source (EBIS), a Radio Frequency Quadrupole (RFQ) accelerator, and a short Linear accelerator (Linac). The highly successful development of an EBIS at Brookhaven National Laboratory (BNL) now makes it possible to replace the present pre-injector that is based on an electrostatic Tandem with a reliable, low maintenance Linac-based pre-injector. Linac-based preinjectors are presently used at most accelerator and collider facilities with the exception of RHIC, where the required gold beam intensities could only be met with a Tandem until the recent EBIS development. EBIS produces high charge state ions directly, eliminating the need for the two stripping foils presently used with the Tandem. Unstable stripping efficiencies of these foils are a significant source of luminosity degradation in RHIC. The high reliability and flexibility of the new Linac-based pre-injector will lead to increased integrated luminosity at RHIC and is an essential component for the long-term success of the RHIC facility. This new pre-injector, based on an EBIS, also has the potential for significant future intensity increases and can produce heavy ion beams of all species including uranium beams and, as part of a future upgrade, might also be used to produce polarized {sup 3}He beams. These capabilities will be critical to the future luminosity upgrades and electron-ion collisions in RHIC. The proposed pre-injector system would also provide for a major enhancement in capability for the NASA Space Radiation Laboratory (NSRL), which utilizes heavy-ion beams from the RHIC complex. EBIS would allow for the acceleration of all important ion species for the NASA radiobiology program, such as, helium, argon, and neon which are unavailable with the present Tandem injector. In addition, the new system would allow for very rapid switching of ion species for

  13. Status of the MAX IV Light Source Project

    SciTech Connect

    Wallen, Erik; Eriksson, Mikael; Berglund, Magnus; Malmgren, Lars; Lindgren, Lars-Johan; Tarawneh, Hamed; Brandin, Mathias; Werin, Sverker; Thorin, Sara; Sjoestroem, Magnus; Svensson, Haakan; Kumbaro, Dionis; Hansen, Tue

    2007-01-19

    The MAX IV light source project is presented. The MAX IV light source will consist of three low emittance storage rings and a 3 GeV injector linac. The three storage rings will be operated at 700 MeV, 1.5 GeV, and 3.0 GeV, which make it possible to cover a large spectral range from IR to hard X-rays with high brilliance undulator radiation from insertion devices optimised for each storage ring. The preparation of the injector linac to serve as a short pulse source and the major sub-systems of the facility are also presented.

  14. Fine sediment sources in conservation effects assessment project watersheds

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Two naturally occurring radionuclides, 7Be and 210Pbxs , were used as tracers to discriminate eroded surface soils from channel-derived sediments in the fine suspended sediment loads of eight Conservation Effects Assessment Project (CEAP) benchmark watersheds. Precipitation, source soils, and suspe...

  15. Spallation neutron source saddle antenna H{sup -} ion source project

    SciTech Connect

    Dudnikov, Vadim; Johnson, Rolland P.; Dudnikova, Galina; Stockli, Martin; Welton, Robert

    2010-02-15

    In this project we are developing an H{sup -} source which will synthesize the most important developments in the field of negative ion sources to provide high current, high brightness, good lifetime, high reliability, and high power efficiency. We describe two planned modifications to the present spallation neutron source external antenna source in order to increase the plasma density near the output aperture: (1) replacing the present 2 MHz plasma-forming solenoid antenna with a 13 MHz saddle-type antenna and (2) replacing the permanent multicusp magnetic system with a weaker electromagnet.

  16. IPNS upgrade: A feasibility study

    SciTech Connect

    1995-04-01

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  17. BNL upgrade plans

    SciTech Connect

    Foelsche, H.W.J.

    1987-01-01

    Brookhaven National Laboratory is proposing two major upgrade projects for a future experimental program with protons and heavy ions. The first is the construction of a Relativistic Heavy Ion Collider (RHIC) which will use the AGS complex as an injector. The second initiative is an upgrade of the AGS proton intensity and duty cycle. Both objectives require a Booster for the AGS which has recently been approved as a construction project. With the completion of the booster, and with certain modifications of the AGS, the facility will ultimately become capable of supporting average proton currents on the order of 25 to 50 microamperes. The RHIC will provide center-of-mass collision energies of 2 x 100 to 125 GeV/amu for ions up to the heaviest masses, and 2 x 250 GeV for protons.

  18. Upgrade of the resonance ionization laser ion source at ISOLDE on-line isotope separation facility: new lasers and new ion beams.

    PubMed

    Fedosseev, V N; Berg, L-E; Fedorov, D V; Fink, D; Launila, O J; Losito, R; Marsh, B A; Rossel, R E; Rothe, S; Seliverstov, M D; Sjödin, A M; Wendt, K D A

    2012-02-01

    The resonance ionization laser ion source (RILIS) produces beams for the majority of experiments at the ISOLDE on-line isotope separator. A substantial improvement in RILIS performance has been achieved through a series of upgrade steps: replacement of the copper vapor lasers by a Nd:YAG laser; replacement of the old homemade dye lasers by new commercial dye lasers; installation of a complementary Ti:Sapphire laser system. The combined dye and Ti:Sapphire laser system with harmonics is capable of generating beams at any wavelength in the range of 210-950 nm. In total, isotopes of 31 different elements have been selectively laser-ionized and separated at ISOLDE, including recently developed beams of samarium, praseodymium, polonium, and astatine. PMID:22380244

  19. Upgrade of the resonance ionization laser ion source at ISOLDE on-line isotope separation facility: New lasers and new ion beamsa)

    NASA Astrophysics Data System (ADS)

    Fedosseev, V. N.; Berg, L.-E.; Fedorov, D. V.; Fink, D.; Launila, O. J.; Losito, R.; Marsh, B. A.; Rossel, R. E.; Rothe, S.; Seliverstov, M. D.; Sjödin, A. M.; Wendt, K. D. A.

    2012-02-01

    The resonance ionization laser ion source (RILIS) produces beams for the majority of experiments at the ISOLDE on-line isotope separator. A substantial improvement in RILIS performance has been achieved through a series of upgrade steps: replacement of the copper vapor lasers by a Nd:YAG laser; replacement of the old homemade dye lasers by new commercial dye lasers; installation of a complementary Ti:Sapphire laser system. The combined dye and Ti:Sapphire laser system with harmonics is capable of generating beams at any wavelength in the range of 210-950 nm. In total, isotopes of 31 different elements have been selectively laser-ionized and separated at ISOLDE, including recently developed beams of samarium, praseodymium, polonium, and astatine.

  20. North Village Ground Source Heat Pump Demonstration Project

    SciTech Connect

    Redderson, Jeff

    2015-08-03

    This project demonstrated the feasibility of converting from a traditional direct exchange system to a ground source heat pump system on a large scale, multiple building apartment complex on a university campus. A total of ten apartment buildings were converted using vertical well fields and a ground source loop that connected the 24 apartments in each building into a common system. The system has yielded significant operational savings in both energy and maintenance and transformed the living environments of these residential buildings for our students.

  1. Flowsheets and source terms for radioactive waste projections

    SciTech Connect

    Forsberg, C.W.

    1985-03-01

    Flowsheets and source terms used to generate radioactive waste projections in the Integrated Data Base (IDB) Program are given. Volumes of each waste type generated per unit product throughput have been determined for the following facilities: uranium mining, UF/sub 6/ conversion, uranium enrichment, fuel fabrication, boiling-water reactors (BWRs), pressurized-water reactors (PWRs), and fuel reprocessing. Source terms for DOE/defense wastes have been developed. Expected wastes from typical decommissioning operations for each facility type have been determined. All wastes are also characterized by isotopic composition at time of generation and by general chemical composition. 70 references, 21 figures, 53 tables.

  2. Directory of financing sources for foreign energy projects

    SciTech Connect

    La Ferla, L.

    1995-09-01

    The Office of National Security Policy has produced this Directory of Financing Sources for Foreign Energy Projects. The Directory reviews programs that offer financing from US government agencies, multilateral organizations, public, private, and quasi-private investment funds, and local commercial and state development banks. The main US government agencies covered are the US Agency for International Development (USAID), the Export-Import Bank of the US (EXIM Bank), Overseas Private Investment Corporation (OPIC), US Department of Energy, US Department of Defense, and the US Trade and Development Agency (TDA). Other US Government Sources includes market funds that have been in part capitalized using US government agency funds. Multilateral organizations include the World Bank, International Finance Corporation (IFC), Asian Development Bank (ADB), European Bank for Reconstruction and Development (EBRD), and various organizations of the United Nations. The Directory lists available public, private, and quasi-private sources of financing in key emerging markets in the Newly Independent States and other developing countries of strategic interest to the US Department of Energy. The sources of financing listed in this directory should be considered indicative rather than inclusive of all potential sources of financing. Initial focus is on the Russian Federation, Ukraine, india, China, and Pakistan. Separate self-contained sections have been developed for each of the countries to enable the user to readily access market-specific information and to support country-specific Departmental initiatives. For each country, the directory is organized to follow the project life cycle--from prefeasibility, feasibility, project finance, cofinancing, and trade finance, through to technical assistance and training. Programs on investment and export insurance are excluded.

  3. Open source projects in software engineering education: a mapping study

    NASA Astrophysics Data System (ADS)

    Nascimento, Debora M. C.; Almeida Bittencourt, Roberto; Chavez, Christina

    2015-01-01

    Context: It is common practice in academia to have students work with "toy" projects in software engineering (SE) courses. One way to make such courses more realistic and reduce the gap between academic courses and industry needs is getting students involved in open source projects (OSP) with faculty supervision. Objective: This study aims to summarize the literature on how OSP have been used to facilitate students' learning of SE. Method: A systematic mapping study was undertaken by identifying, filtering and classifying primary studies using a predefined strategy. Results: 72 papers were selected and classified. The main results were: (a) most studies focused on comprehensive SE courses, although some dealt with specific areas; (b) the most prevalent approach was the traditional project method; (c) studies' general goals were: learning SE concepts and principles by using OSP, learning open source software or both; (d) most studies tried out ideas in regular courses within the curriculum; (e) in general, students had to work with predefined projects; (f) there was a balance between approaches where instructors had either inside control or no control on the activities performed by students; (g) when learning was assessed, software artefacts, reports and presentations were the main instruments used by teachers, while surveys were widely used for students' self-assessment; (h) most studies were published in the last seven years. Conclusions: The resulting map gives an overview of the existing initiatives in this context and shows gaps where further research can be pursued.

  4. Offsite source recovery project - ten years of sealed source recovery and disposal

    SciTech Connect

    Whitworth, Julia Rose; Pearson, Mike; Witkowski, Ioana; Wald - Hopkins, Mark; Cuthbertson, A

    2010-01-01

    The Global Threat Reduction Initiative's (GTRI) Offsite Source Recovery Project (OSRP) has been recovering excess and unwanted radioactive sealed sources for ten years. In January 2009, GTRI announced that the project had recovered 20,000 sealed radioactive sources (this number has since increased to more than 23,000). This project grew out of early efforts at Los Alamos National Laboratory (LANL) to recover and disposition excess Plutonium-239 (Pu-239) sealed sources that were distributed in the 1960s and 1970s under the Atoms for Peace Program. Decades later, these sources began to exceed their special form certifications or fall out of regular use. As OSRP has collected and stored sealed sources, initially using 'No Path Forward' waste exemptions for storage within the Department of Energy (DOE) complex, it has consistently worked to create disposal pathways for the material it has recovered. The project was initially restricted to recovering sealed sources that would meet the definition of Greater-than-Class-C (GTCC) low-level radioactive waste, assisting DOE in meeting its obligations under the Low-level Radioactive Waste Policy Act Amendments (PL 99-240) to provide disposal for this type of waste. After being transferred from DOE-Environmental Management (EM) to the U.S. National Nuclear Security Administration (NNSA) to be part of GTRI, OSRP's mission was expanded to include not only material that would be classified as GTCC when it became waste, but also any other materials that might constitute a 'national security consideration.' It was recognized at the time that the GTCC category was a waste designation having to do with environmental consequence, rather than the threat posed by deliberate or accidental misuse. The project faces barriers to recovery in many areas, but disposal continues to be one of the more difficult to overcome. This paper discusses OSRP's disposal efforts over its 10-year history. For sources meeting the DOE definition of

  5. Back-Projecting Volcano and Geyser Seismic Signals to Sources

    NASA Astrophysics Data System (ADS)

    Kelly, C. L.; Lawrence, J. F.; Ebinger, C. J.

    2015-12-01

    Volcanic and hydrothermal systems are generally characterized by persistent, low-amplitude seismic "noise" with no clear onset or end. Outside of active eruptions and earthquakes, which tend to occur only a small fraction of the time, seismic records and spectrograms from these systems are dominated by long-duration "noise" (typically around 1-5Hz) generated by ongoing processes in the systems' subsurface. Although it has been shown that these low-amplitude signals can represent a series of overlapping low-magnitude displacements related to fluid and volatile movement at depth, because of their "noisy" properties compared to typical active or earthquake sources they are difficult to image using traditional seismic techniques (i.e. phase-picking). In this study we present results from applying a new ambient noise back-projection technique to improve seismic source imaging of diffuse signals found in volcanic and hydrothermal systems. Using this new method we show how the distribution of all seismic sources - particularly sources associated with volcanic tremor - evolves during a proposed intrusion in early June 2010 at Sierra Negra Volcano on the Galápagos Archipelago off the coast of Ecuador. We use a known velocity model for the region (Tepp et al., 2014) to correlate and back-project seismic signals from all available receiver-pairs to potential subsurface source locations assuming bending raypaths and accounting for topography. We generate 4D time-lapsed images of the source field around Sierra Negra before, during and after the proposed intrusion and compare the consistency of our observations with previously identified seismic event locations and tomography results from the same time period. Preliminary results from applying the technique to a dense grid of geophones surrounding a periodically erupting geyser at El Tatio Geyser Field in northern Chile (>2000 eruptions recorded) will also be presented.

  6. Urban upgrading and its impact on health: a "quasi-experimental" mixed-methods study protocol for the BH-Viva Project.

    PubMed

    Friche, Amélia Augusta de Lima; Dias, Maria Angélica de Salles; Reis, Priscila Brandão Dos; Dias, Cláudia Silva; Caiaffa, Waleska Teixeira

    2015-11-01

    There is little scientific evidence that urban upgrading helps improve health or reduce inequities. This article presents the design for the BH-Viva Project, a "quasi-experimental", multiphase, mixed-methods study with quantitative and qualitative components, proposing an analytical model for monitoring the effects that interventions in the urban environment can have on residents' health in slums in Belo Horizonte, Minas Gerais State, Brazil. A preliminary analysis revealed intra-urban differences in age-specific mortality when comparing areas with and without interventions; the mortality rate from 2002 to 2012 was stable in the "formal city", increased in slums without interventions, and decreased in slums with interventions. BH-Viva represents an effort at advancing methodological issues, providing learning and theoretical backing for urban health research and research methods, allowing their application and extension to other urban contexts. PMID:26648363

  7. Energy Efficiency Upgrades

    SciTech Connect

    Roby Williams

    2012-03-29

    The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 was replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.

  8. The Polarized Electron Source for the International Collider (ILC) Project

    NASA Astrophysics Data System (ADS)

    Brachmann, A.; Clendenin, J. E.; Garwin, E. L.; Ioakeimidi, K.; Kirby, R. E.; Maruyama, T.; Prescott, C. Y.; Sheppard, J.; Turner, J.; Zhou, F.

    2007-06-01

    The ILC project will be the next large high energy physics tool that will use polarized electrons (and positrons). For this machine spin physics will play an important role. The polarized electron source design is based on electron injectors built for the Stanford Linear Collider (polarized) and Tesla Test Facility (un-polarized). The ILC polarized electron source will provide a 5GeV spin polarized electron beam for injection into the ILC damping ring. Although most ILC machine parameters have been achieved by the SLC or TTF source, features of both must be integrated into one design. The bunch train structure presents unique challenges to the source laser drive system. A suitable laser system has not yet been demonstrated and is part of the ongoing R&D program for ILC at SLAC. Furthermore, ILC injector R&D incorporates photocathode development, increasing available polarization, and improving operational properties in gun vacuum systems. Another important area of research and development is advancing the design of DC and RF electron gun technology for polarized sources. This presentation presents the current status of the design and outlines aspects of the relevant R&D program carried out within the ILC community.

  9. Sources of Uncertainty in Climate Change Projections of Precipitation

    NASA Astrophysics Data System (ADS)

    Gutmann, Ethan; Clark, Martyn; Eidhammer, Trude; Ikeda, Kyoko; Deser, Clara; Brekke, Levi; Arnold, Jeffrey; Rasmussen, Roy

    2016-04-01

    Predicting the likely changes in precipitation due to anthropogenic climate influences is one of the most important problems in earth science today. This problem is complicated by the enormous uncertainty in current predictions. Until all such sources of uncertainty are adequately addressed and quantified, we can not know what changes may be predictable, and which masked by the internal variability of the climate system itself. Here we assess multiple sources of uncertainty including those due to internal variability, climate model selection, emissions scenario, regional climate model physics, and statistical downscaling methods. This work focuses on the Colorado Rocky Mountains because these mountains serve as the water towers for much of the western United States, but the results are more broadly applicable, and results will be presented covering the Columbia River Basin and the California Sierra Nevadas as well. Internal variability is assessed using 30 members of the CESM Large Ensemble. Uncertainty due to the choice of climate models is assessed using 100 climate projections from the CMIP5 archive, including multiple emissions scenarios. Uncertainty due to regional climate model physics is assessed using a limited set of high-resolution Weather Research and Forecasting (WRF) model simulations in comparison to a larger multi-physics ensemble using the Intermediate Complexity Atmospheric Research (ICAR) model. Finally, statistical downscaling uncertainty is assessed using multiple statistical downscaling models. In near-term projections (25-35 years) internal variability is the largest source of uncertainty; however, over longer time scales (70-80 years) other sources of uncertainty become more important, with the importance of different sources of uncertainty varying depending on the metric assessed.

  10. FRG sealed isotopic heat sources project (C-229) project management plan

    SciTech Connect

    Metcalf, I.L.

    1997-05-16

    This Project Management Plan defines the cost, scope, schedule, organizational responsibilities, and work breakdown structure for the removal of the Federal Republic of Germany (FRG) Sealed Isotopic Heat Sources from the 324 Building and placed in interim storage at the Central Waste Complex (CWC).

  11. Wanapum Dam Advanced Hydro Turbine Upgrade Project: Part 2 - Evaluation of Fish Passage Test Results Using Computational Fluid Dynamics

    SciTech Connect

    Dresser, Thomas J.; Dotson, Curtis L.; Fisher, Richard K.; Graf, Michael J.; Richmond, Marshall C.; Rakowski, Cynthia L.; Carlson, Thomas J.; Mathur, Dilip; Heisey, Paul G.

    2007-10-10

    This paper, the second part of a 2 part paper, discusses the use of Computational Fluid Dynamics (CFD) to gain further insight into the results of fish release testing conducted to evaluate the modifications made to upgrade Unit 8 at Wanapum Dam. Part 1 discusses the testing procedures and fish passage survival. Grant PUD is working with Voith Siemens Hydro (VSH) and the Pacific Northwest National Laboratory (PNNL) of DOE and Normandeau Associates in this evaluation. VSH has prepared the geometry for the CFD analysis corresponding to the four operating conditions tested with Unit 9, and the 5 operating conditions tested with Unit 8. Both VSH and PNNL have conducting CFD simulations of the turbine intakes, stay vanes, wicket gates, turbine blades and draft tube of the units. Primary objectives of the analyses were: • determine estimates of where the inserted fish passed the turbine components • determine the characteristics of the flow field along the paths calculated for pressure, velocity gradients and acceleration associated with fish sized bodies • determine the velocity gradients at the structures where fish to structure interaction is predicted. • correlate the estimated fish location of passage with observed injuries • correlate the calculated pressure and acceleration with the information recorded with the sensor fish • utilize the results of the analysis to further interpret the results of the testing. This paper discusses the results of the CFD analyses made to assist the interpretation of the fish test results.

  12. Management of Astronomical Software Projects with Open Source Tools

    NASA Astrophysics Data System (ADS)

    Briegel, F.; Bertram, T.; Berwein, J.; Kittmann, F.

    2010-12-01

    In this paper we will offer an innovative approach to managing the software development process with free open source tools, for building and automated testing, a system to automate the compile/test cycle on a variety of platforms to validate code changes, using virtualization to compile in parallel on various operating system platforms, version control and change management, enhanced wiki and issue tracking system for online documentation and reporting and groupware tools as they are: blog, discussion and calendar. Initially starting with the Linc-Nirvana instrument a new project and configuration management tool for developing astronomical software was looked for. After evaluation of various systems of this kind, we are satisfied with the selection we are using now. Following the lead of Linc-Nirvana most of the other software projects at the MPIA are using it now.

  13. Advanced Neutron Source (ANS) Project. Progress report FY 1993

    SciTech Connect

    Campbell, J.H.; Selby, D.L.; Harrington, R.M.; Thompson, P.B.

    1994-01-01

    This report covers the progress made in 1993 in the following sections: (1) project management; (2) research and development; (3) design and (4) safety. The section on research and development covers the following: (1) reactor core development; (2) fuel development; (3) corrosion loop tests and analysis; (4) thermal-hydraulic loop tests; (5) reactor control and shutdown concepts; (6) critical and subcritical experiments; (7) material data, structure tests, and analysis; (8) cold source development; (9) beam tube, guide, and instrument development; (10) neutron transport and shielding; (11) I and C research and development; and (12) facility concepts.

  14. Chandra Orion Ultradeep Project: Observations and Source Lists

    NASA Astrophysics Data System (ADS)

    Getman, K. V.; Flaccomio, E.; Broos, P. S.; Feigelson, E. D.; Grosso, N.; Tsujimoto, M.; COUP Collaboration

    2004-08-01

    We present the observations, data analysis methodology, and tabulated results from the Chandra Orion Ultradeep Project (COUP). COUP is based on a single nearly-continuous 850 ks pointing towards the Orion Nebula obtained in January 2003. Over 1600 young stars are detected. Data preparation includes correction for charge transfer inefficiency and subpixel event repositioning. Source detection is based on two wavelet-based search algorithms optimized for maximum reduction of background. For each source, we perform data extraction, pileup correction, spectral and variability analysis, and broad-band luminosity determinations using the sophisticated semi-automated IDL-based ACIS Extract (AE) package. Our treatment of photon pileup using annular extraction regions is effective for both lightly and heavily piledup sources. The AE data products efficiently provide detailed and comprehensive information for point sources in ACIS fields. COUP is supported by Chandra grant SAO GO3-4009A (Feigelson PI). ACIS Extract is available at http://www.astro.psu.edu/xray/docs/TARA/ae_users_guide.html.

  15. The Tropical Biominer Project: mining old sources for new drugs.

    PubMed

    Artiguenave, François; Lins, André; Maciel, Wesley Dias; Junior, Antonio Celso Caldeira; Nacif-Coelho, Carla; de Souza Linhares, Maria Margarida Ribeiro; de Oliveira, Guilherme Correa; Barbosa, Luis Humberto Rezende; Lopes, Júlio César Dias; Junior, Claudionor Nunes Coelho

    2005-01-01

    The Tropical Biominer Project is a recent initiative from the Federal University of Minas Gerais (UFMG) and the Oswaldo Cruz foundation, with the participation of the Biominas Foundation (Belo Horizonte, Minas Gerais, Brazil) and the start-up Homologix. The main objective of the project is to build a new resource for the chemogenomics research, on chemical compounds, with a strong emphasis on natural molecules. Adopted technologies include the search of information from structured, semi-structured, and non-structured documents (the last two from the web) and datamining tools in order to gather information from different sources. The database is the support for developing applications to find new potential treatments for parasitic infections by using virtual screening tools. We present here the midpoint of the project: the conception and implementation of the Tropical Biominer Database. This is a Federated Database designed to store data from different resources. Connected to the database, a web crawler is able to gather information from distinct, patented web sites and store them after automatic classification using datamining tools. Finally, we demonstrate the interest of the approach, by formulating new hypotheses on specific targets of a natural compound, violacein, using inferences from a Virtual Screening procedure. PMID:15969645

  16. The TACIS Nuclear Programme: Assistance in Upgrading Russian Nuclear Power Stations - An Overview of the Individual Projects in the Internet

    SciTech Connect

    Bieth, Michel; Schoels, Hubert

    2006-07-01

    The European Union' TACIS1 programme has been established for the New Independent States (NIS), among them in the Russian Federation since 1991. One priority of TACIS funding is Nuclear Safety. The European Commission has made available a total of 944 Million Euros for nuclear safety programmes covering the period 1991-2003. The TACIS nuclear safety programme is devoted to the improvement of the safety of Soviet designed nuclear installations in providing technology and safety culture transfer. JRC is carrying out works in the following areas: On-Site Assistance for TACIS operating Nuclear Power Plants; Design Safety and Dissemination of TACIS results; Reactor Pressure Vessel Embrittlement for VVER; Regulatory Assistance; Industrial Waste Management; Nuclear Safeguards; All TACIS projects, dealing with these areas of activity are now available in so called Project Description Sheets (PDS) or Project Results Sheets (PRS) in the Internet for everybody. JRC has created in the Internet an easy to open and to browse database which contains the result of works in relation to the above mentioned nuclear activities. This presentation gives an on-line overview of the app. 430 projects which have been implemented so far since the outset of the TACIS Nuclear Programme in the Russian Federation, which is representative to the other CIS countries, benefiting from the TACIS. The presentation will mainly consist of an on-line-demonstration of the TACIS Nuclear WEB Page, created by JRC. (authors)

  17. A new H2 (+) source: Conceptual study and experimental test of an upgraded version of the VIS-Versatile ion source.

    PubMed

    Castro, G; Torrisi, G; Celona, L; Mascali, D; Neri, L; Sorbello, G; Leonardi, O; Patti, G; Castorina, G; Gammino, S

    2016-08-01

    The versatile ion source is an off-resonance microwave discharge ion source which produces a slightly overdense plasma at 2.45 GHz of pumping wave frequency extracting more than 60 mA proton beams and 50 mA He(+) beams. DAEδALUS and IsoDAR experiments require high intensities for H2 (+) beams to be accelerated by high power cyclotrons for neutrinos generation. In order to fulfill the new requirements, a new plasma chamber and injection system has been designed and manufactured for increasing the H2 (+) beam intensity. In this paper the studies for the increasing of the H2 (+)/p ratio and for the design of the new plasma chamber and injection system will be shown and discussed together with the experimental tests carried out at Istituto Nazionale di Fisica Nucleare-Laboratori Nazionali del Sud (INFN-LNS) and at Best Cyclotron Systems test-bench in Vancouver, Canada. PMID:27587109

  18. A new H2+ source: Conceptual study and experimental test of an upgraded version of the VIS—Versatile ion source

    NASA Astrophysics Data System (ADS)

    Castro, G.; Torrisi, G.; Celona, L.; Mascali, D.; Neri, L.; Sorbello, G.; Leonardi, O.; Patti, G.; Castorina, G.; Gammino, S.

    2016-08-01

    The versatile ion source is an off-resonance microwave discharge ion source which produces a slightly overdense plasma at 2.45 GHz of pumping wave frequency extracting more than 60 mA proton beams and 50 mA He+ beams. DAEδALUS and IsoDAR experiments require high intensities for H2+ beams to be accelerated by high power cyclotrons for neutrinos generation. In order to fulfill the new requirements, a new plasma chamber and injection system has been designed and manufactured for increasing the H2+ beam intensity. In this paper the studies for the increasing of the H2+/p ratio and for the design of the new plasma chamber and injection system will be shown and discussed together with the experimental tests carried out at Istituto Nazionale di Fisica Nucleare-Laboratori Nazionali del Sud (INFN-LNS) and at Best Cyclotron Systems test-bench in Vancouver, Canada.

  19. Advanced Neutron Source (ANS) Project progress report, FY 1994

    SciTech Connect

    Campbell, J.H.; King-Jones, K.H.; Selby, D.L.; Harrington, R.M.; Thompson, P.B.

    1995-01-01

    The President`s budget request for FY 1994 included a construction project for the Advanced Neutron Source (ANS). However, the budget that emerged from the Congress did not, and so activities during this reporting period were limited to continued research and development and to advanced conceptual design. A significant effort was devoted to a study, requested by the US Department of Energy (DOE) and led by Brookhaven National Laboratory, of the performance and cost impacts of reducing the uranium fuel enrichment below the baseline design value of 93%. The study also considered alternative core designs that might mitigate those impacts. The ANS Project proposed a modified core design, with three fuel elements instead of two, that would allow operation with only 50% enriched uranium and use existing fuel technology. The performance penalty would be 15--20% loss of thermal neutron flux; the flux would still just meet the minimum design requirement set by the user community. At the time of this writing, DOE has not established an enrichment level for ANS, but two advisory committees have recommended adopting the new core design, provided the minimum flux requirements are still met.

  20. On-site nondestructive inspection by upgraded portable 950 keV/3.95 MeV X-band linac x-ray sources

    NASA Astrophysics Data System (ADS)

    Ueaska, Mitsuru; Dobashi, Katsuhiro; Fujiwara, Takeshi; Pei, Cuixiang; Wu, Wenjing; Kusano, Joichi; Nakamura, Naoki; Yamamoto, Masashi; Tanabe, Eiji; Ohya, Seiji; Hattori, Yukiya; Miura, Itaru; Honma, Hidetaka; Ishida, Masahiro; Kimura, Yoshitomi

    2014-12-01

    We have developed and upgraded portable 950 keV/3.95 MeV X-band (9.3 GHz) linac x-ray sources for on-site nondestructive testing (NDT) for social and industrial infrastructures. We integrated the hardware devices as well as software systems. For the hardware, we established all designed parameters including x-ray intensities of 0.05/2 Gy min-1 at 1 m for 950 keV/3.95 MeV systems, respectively. Concerning the software, we adopted the wavelet analysis for enhanced image contrast and partial angle computed tomography (CT) for a small region of interest. The wavelet analysis is effective to reduce scattered low energy x-ray noise in addition to using physical filters and collimators. The partial CT is inevitable to reconstruct an inner reinforced iron tube in concrete. We successfully performed on-site inspection three times, namely of a nitrogen acid distillation tower, a reinforced concrete pier and a large sample cut from a bridge. We obtained the x-ray images of the inner tube, determined the sizes of reinforced iron parts and evaluated the mechanical tolerance. Moreover, we are developing a new x-ray camera specified for MeV x-rays used for NDT of heavy objects. Then, our system will become a self-consisting and specialized high energy x-ray on-site inspection system. We are going to promote an application to NDT of social and industrial infrastructures in Japan and around the world.

  1. Social and Economic Impact of the Candle Light Source Project Candle project impact

    NASA Astrophysics Data System (ADS)

    Baghiryan, M.

    Social and economic progress related to the realization of the CANDLE synchrotron light source creation project in Armenia is discussed. CANDLE service is multidisciplinary and long-lasting. Its impacts include significant improvement in science capacities, education quality, industrial capabilities, investment climate, country image, international relations, health level, restraining the "brain-drain", new workplaces, etc. CANDLE will serve as a universal national infrastructure assuring Armenia as a country with knowledge-based economy, a place for doing high-tech business, and be a powerful tool in achieving the country's jump forward in general.

  2. Control upgrade study for Huntley Unit 65

    SciTech Connect

    Barber, S.H.; Colasanti, R.; Marko, R. ); Lassahn, P.L.; Brown, B.B.; House, W.E.; Rumble, E.T. III; Koren, J.M.; Grote, T.A.; Fray, R.R. )

    1990-08-01

    This report describes a reliability, availability, and maintainability (RAM) analysis conducted to support the Control Upgrade Project. The study's principal objective was to determine the potential benefits of upgrading the Huntley Unit 65 control system. Other study objectives included technology transfer and the identification of the main contributors to plant unavailability. The project used CAFTA software to model the plant. The RAM analysis was supplemented with a human factors evaluation. 15 refs., 20 figs., 7 tabs.

  3. Scientific Upgrades at the Oak Ridge National Laboratory High Flux Isotope Reactor

    SciTech Connect

    Selby, Douglas L; Jones, Amy; Crow, Lowell

    2012-01-01

    The United States Department of Energy is sponsoring a number of projects that will provide scientific upgrades to the neutron science facilities associated with the High Flux Isotope Reactor (HFIR) located at Oak Ridge National Laboratory. Funding for the first upgrade project was initiated in 1996 and all presently identified upgrade projects are expected to be completed by the end of 2003. The upgrade projects include: (1) larger beam tubes, (2) a new monochromator drum for the HB-1 beam line, (3) a new HB-2 beam line system that includes one thermal guide and a new monochromator drum, (4) new instruments for the HB-2 beamline, (5) a new monochromator drum for the HB-3 beam line, (6) a supercritical hydrogen cold source system to be retrofitted into the HB-4 beam tube, (7) a 3.5 kW refrigeration system at 20 K to support the cold source and a new building to house it, (8) a new HB-4 beam line system composed of four cold neutron guides with various mirror coatings and associated shielding, (9) a number of new instruments for the cold beams including two new SANS instruments, and (10) construction of support buildings. This paper provides a short summary of these projects including their present status and schedule.

  4. Scientific Upgrades at the High Flux Isotope Reactor at Oak Ridge National Laboratory

    SciTech Connect

    Selby, Douglas L; Smith, Gregory Scott

    2010-01-01

    The United States Department of Energy is sponsoring a number of projects that will provide scientific upgrades to the neutron science facilities associated with the high Flux Isotope Reactor (HFIR) located at Oak Ridge National Laboratory. Funding for the first upgrade project was initiated in 1996 and all presently identified upgrade projects are expected to be completed by the end of 2003. The upgrade projects include: (1) larger beam tubes, (2) a new monochromator drum for the HB-1 beam line, (3) a new HB-2 beam line system that includes one thermal guide and a new monochromator drum, (4) new instruments for the HB-2 beamline, (5) a new monochromator drum for the HB-3 beam line, (6) a supercritical hydrogen cold source system to be retrofitted into the HB-4 beam tube, (7) a 3.5 kW refrigeration system at 20 K to support the cold source and a new building to house it, (8) a new HB-4 beam line system composed of four cold neutron guides with various mirror coatings and associated shielding, (9) a number of new instruments for the cold beams including two new SANS instruments, and (10) construction of support buildings. This paper provides a short summary of these projects including their present status and schedule.

  5. Superconducting Prototype Cavities for the Spallation Neutron Source (SNS) Project

    SciTech Connect

    Peter Kneisel; John Brawley; Richard Bundy; Gianluigi Ciovati; Kurt Macha; Danny Machie; John Mammosser; Ron Sundelin; Larry Turlington; Katherine Wilson; J. Sekutowicz; D. Barni; C. Pagani; R. Parodi; P. Pierini; D. Schrage; M. Doleans; S.H. Kim; D. Mangra; P. Ylae-Oijala

    2001-06-01

    The Spallation Neutron Source project includes a superconducting linac section in the energy range from 192 MeV to 1000 MeV. For this energy range two types of cavities are needed with geometrical beta - values of beta = 0.61 and beta = 0.81. An aggressive cavity prototyping program is being pursued at Jlab, which calls for fabricating and testing of four beta = 0.61 cavities and two beta = 0.81 cavities. Both types consist of six cells made from high purity niobium and feature one HOM coupler of the TESLA type on each beam pipe and a port for a high power coaxial input coupler. Three of the four beta = 0.61 cavities will be used for a cryomodule test at the end of the year 2001. At this time two cavities of each type have been fabricated and the first tests on the beta = 0.61 cavity exceeded the design values for gradient and Q - value: Eacc = 10.3 MV/m and Q = 6.5 x 10{sup 9} at 2.1K. This paper will describe the cavity design with respect to electrical and mechanical features, the fabrication efforts and the results obtained with the different cavities existing at the time of the conference.

  6. SNO+ Readout Electronics Upgrades

    NASA Astrophysics Data System (ADS)

    Bonventre, Richard; Shokair, Timothy; Knapik, Robert

    2012-03-01

    The SNO+ experiment is designed to explore several topics in neutrino physics including neutrinoless double beta decay, reactor antineutrinos, and low energy solar neutrinos. SNO+ uses the existing Sudbury Neutrino Observatory (SNO) detector, with the heavy water target replaced with liquid scintillator. The new target requires an upgrade to the command and control electronics to handle the higher rates expected with scintillation light as compared to Cherenkov light. The readout electronics have been upgraded to autonomously push data to a central data acquisition computer over ethernet from each of the 19 front end crates. The autonomous readout is achieved with a field programmable gate array (FPGA) with an embedded processor. Inside the FPGA fabric a state machine is configured to pull data across the VME-like bus of each crate. A small C program, making use of the open source Light Weight IP (LWIP) libraries, is run directly on the hardware (with no operating system) to push the data via TCP/IP. The hybrid combination of `high-level' C code and a `low-level' VHDL state machine is a cost effective and flexible solution for reading out individual front end crates.

  7. Completion of the ATLAS control system upgrade.

    SciTech Connect

    Munson, F. H.

    1998-11-30

    In the fall of 1992 at the SNEAP(Symposium of North Eastern Accelerator Personnel) a project to up grade the ATLAS (Argonne Tandem Linear Accelerator System) control system was first reported. Not unlike the accelerator it services the control system will continue to evolve. However, the first of this year has marked the completion of this most recent upgrade project. Since the control system upgrade took place during a period when ATLAS was operating at a record number of hours, special techniques were necessary to enable the development of the new control system ''on line'' while still saving the needs of normal operations. This paper reviews the techniques used for upgrading the ATLAS control system while the system was in use. In addition a summary of the upgrade project and final configuration, as well as some of the features of the new control system is provided.

  8. Superconducting Prototype Cavities for the Spallation Neutron Source (SNS) Project

    SciTech Connect

    Gianluigi Ciovati

    2001-09-01

    The Spallation Neutron Source project includes a superconducting linac section in the energy range from 186 MeV to 1000 MeV. For this energy range two types of cavities are needed with geometrical {beta} values of {beta} = 0.61 and {beta} = 0.81. An aggressive cavity prototyping program is being pursued at Jefferson Lab, which calls for fabricating and testing four {beta} = 0.61 cavities and two {beta} = 0.81 cavities. Both types consist of six cells made from high purity niobium and feature one HOM coupler on each beam pipe and a port for a high power coaxial input coupler. Three of the four {beta} = 0.61 cavities will be used for a cryomodule test in early 2002. At this time four medium beta cavities and one high beta cavity have been completed at JLab. The first tests on the {beta} = 0.61 and {beta} = 0.81 exceeded the design values for gradient and Q value: E{sub acc} = 10.1 MV/m and Q = 5 x 10{sup 9} at 2.1K for the {beta} = 0.61 and E{sub acc} = 12.3 MV/m and Q = 5 x 10{sup 9} at 2.1 K for the {beta} = 0.81. One of the medium beta cavities has been equipped with an integrated helium vessel and measurements of the static Lorentz force detuning have been done and compared to the ''bare'' cavities. In addition two single cell cavities have been fabricated, equipped with welded-on HOM couplers. They are being used to evaluate the HOM couplers with respect to multipacting, fundamental mode rejection and HOM damping as far as possible in a single cell. This paper describes the cavity design with respect to electromagnetic and mechanical features, the fabrication efforts and the results obtained with the different cavities existing at the time of this workshop.

  9. EMF Rapid Program Engineering Projects, Project 1, Development of Recommendations for Guidelines for Field Source Measurement

    SciTech Connect

    Electric Research and Management, Inc.

    1997-03-11

    The goal of this project is to develop a protocol for measuring the electric and magnetic fields around sources. Data from these measurements may help direct future biological effects research by better defining the complexity of magnetic and electric fields to which humanity is exposed, as well asprovide the basis for rigorous field exposure analysis and risk assessment once the relationship between field exposure and biological response. is better understood. The data base also should have sufficient spatial and temporal characteristics to guide electric and magnetic field management. The goal of Task A is to construct a set of characteristics that would be ideal to have for guiding and interpreting biological studies and for focusing any future effort at field management. This ideal set will then be quantified and reduced according to the availability (or possible development of) instrumentation to measure the desired characteristics. Factors that also will be used to define pragmatic data sets will be the cost of collecting the data, the cost of developing an adequate data base, and the needed precision in measuring specific characteristics. A field, electric or magnetic, will always be ,some function of time and space. The first step in this section of the protocol development will be to determine what span of time and what portion of space are required to quantify the electric and magnetic fields around sources such as appliances and electrical apparatus. Constraints on time will be set by examining measurement limitations and biological data requirements.

  10. Superconducting Prototype Cavities for the Spallation Neutron Source (SNS) Project

    SciTech Connect

    G. Ciovati; P. Kneisel; K. Davis; K. Macha; J. Mammosser

    2002-06-01

    The Spallation Neutron Source project includes a superconducting linac section in the energy range from 186 MeV to 1000 MeV operating at a frequency of 805 MHz at 2.1 K. For this energy range two types of cavities are needed with geometrical Beta-values of Beta=0.61 and Beta=0.81. An aggressive cavity prototyping program is being pursued at JLab, which calls for fabricating and testing of four Beta=0.61 cavities and two Beta=0.81 cavities. Both types consist of six cells made from high purity niobium and feature one HOM coupler of the TESLA type on each beam pipe and a port for a high power coaxial input coupler. Three of the four Beta=0.61 cavities will be used for a cryomodule test in early 2002. At this time, four medium beta cavities and one high beta cavity have been completed and tested at JLab. In addition, the three medium beta cavities for the prototype cryomodule have been equipped with the integrated Ti-Helium vessel, successfully retested and will be assembled into a cavity string. Results from the cryo-module test should be available by the time of the conference. The tests on the Beta=0.61 cavity and the Beta=0.81 cavity exceeded the design values for gradient and Q - value: E{sub acc} =10.1 MV/m and Q = 5 x 10{sup 9} at 2.1K for Beta=0.61 and E{sub acc} = 12.3 MV/m and Q=5 x 10{sup 9} at 2.1K for Beta = 0.81. The medium beta cavities reached gradients between E{sub acc} = 15 MV/m and 21 MV/m. This paper will describe the test results obtained with the various cavities, some aspects of the HOM damping at cryogenic temperatures, results from microphonics and Lorentz force detuning tests and the cavity string assembly at the time of this workshop.

  11. Superconducting Prototype Cavities for the Spallation Neutron Source (SNS) Project

    SciTech Connect

    G. Ciovati, P. Kneisel , J. Brawley, R. Bundy, I. Campisi, K. Davis; K. Macha; D. Machie; J. Mammosser; S. Morgan; R. Sundelin; L. Turlington; K. Wilson; M. Doleans; S.H. Kim; D. Barni; C. Pagani; P. Pierini; K. Matsumoto; R. Mitchell; D. Schrage; R. Parodi; J. Sekutowicz; P. Ylae-Oijala

    2001-09-01

    The Spallation Neutron Source project includes a superconducting linac section in the energy range from 192 MeV to 1000 MeV, operating at a frequency of 805 MHz at 2.1 K. For this energy range two types of cavities are needed with geometrical beta - values of beta= 0.61 and beta= 0.81. An aggressive cavity prototyping program is being pursued at Jlab, which calls for fabricating and testing of four beta= 0.61 cavities and two beta= 0.81 cavities. Both types consist of six cells made from high purity niobium and feature one HOM coupler on each beam pipe and a port for a high power coaxial input coupler. Three of the four beta= 0.61 cavities will be used for a cryomodule test in early 2002. At this time four medium beta cavities and one high beta cavity have been completed at JLab. The first tests on the beta=0.61 cavity and the beta= 0.81 exceeded the design values for gradient and Q - value: E{sub acc} = 1 0.3 MV/m and Q = 5 x 10{sup 9} at 2.1K for beta= 0.61 and E{sub acc} = 12.3 MV/m and Q = 5 x 10{sup 9} at 2.1K for beta= 0.81. One of the medium beta cavities has been equipped with an integrated helium vessel and measurements of the static and dynamic Lorentz force detuning will be done and compared to the ''bare'' cavities. In addition two single cell cavities have been fabricated, equipped with welded-on HOM couplers. They are being used to evaluate the HOM couplers with respect to multipacting, fundamental mode rejection and HOM damping as far as possible in a single cell. This paper will describe the cavity design with respect to electrical and mechanical features, the fabrication efforts and the results obtained with the different cavities existing at the time of this workshop.

  12. The Jefferson Lab 12 GeV Upgrade

    SciTech Connect

    R.D. McKeown

    2010-09-01

    Construction of the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is presently underway. This upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and the construction of upgraded detector hardware. An overview of this upgrade project is presented, along with highlights of the anticipated experimental program. The 12 GeV upgrade project at Jefferson Lab will enable a powerful new experimental program that will advance our understanding of the quark/gluon structure of hadronic matter, the nature of Quantum Chromodynamics, and the properties of a new extended standard model of particle interactions. Commissioning of the upgraded beam will be begin in 2013, and the full complement of upgraded experimental equipment will be completed in 2015. This unique facility will provide many opportunities for exploration and discovery for a large international community of nuclear scientists.

  13. Thulium heat source: IR D project 91-031

    SciTech Connect

    Walter, C.E.; Kammeraad, J.E.; Newman, J.G.; Van Konynenburg, R.; VanSant, J.H.

    1991-04-10

    The goal of the Thulium Heat Source study is to determine the performance capability and evaluate the safety and environmental aspects of a thulium-170 heat source. Our approach is to study parametrically the performance of thulium-170 heat source designs in the power range of 5--50 kW{sub th}. At least three heat source designs will be characterized in this power range and integrated with various power conversion subsystems to assess their performance, mass, and volume. We will determine shielding requirements, and consider the safety and environmental aspects of their use.

  14. Safety analysis report for packaging upgrade plan

    SciTech Connect

    KELLY, D.L.

    1998-11-18

    This Safety Analysis Report for Packaging (SARP) Upgrade Plan reflects a revised SARP upgrade schedule based on the most current program needs. A Project Hanford Management Contract (PHMC) Performance Expectation exists to update, revise, and/or cancel seven onsite SARPS during FY 1999. It is the U.S. Department of Energy's desire that 100% of the SARPs (which existed at the beginning of the PHMC Contract) be upgraded, revised, and/or canceled by the end of the five year contract. This plan is a ''living'' document and is used as a management tool.

  15. Instrumentation and control upgrade plan for Browns Ferry nuclear plant

    SciTech Connect

    Belew, M.R.; Langley, D.T. ); Torok, R.C.; Wilkinson, C.D. ); Stanley, L. )

    1992-01-01

    A comprehensive upgrade of the instrumentation and control (I C) systems at a power plant represents a formidable project for any utility. For a nuclear plant, the extra safety and reliability requirements along with regulatory constraints add further complications and cost. The need for the upgrade must, therefore, be very compelling, and the process must be well planned from the start. This paper describes the steps taken to initiate the I C upgrade process for Tennessee Valley Authority's (TVA's) Browns Ferry 2 nuclear plant. It explains the impetus for the upgrade, the expected benefits, and the process by which system upgrades will be selected and implemented.

  16. Upgrade of CEBAF from 6 Gev To 12 Gev: Status

    SciTech Connect

    Harwood, Leigh

    2013-04-19

    The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plant's capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

  17. The FNAL Injector Upgrade Status

    SciTech Connect

    Tan, C.Y.; Bollinger, D.S.; Duel, K.L.; Karns, P.R.; Lackey, J.R.; Pellico, W.A; Scarpine, V.E.; Tomlin, R.E.; /Fermilab

    2012-05-14

    The new FNAL H{sup -} injector upgrade is currently being tested before installation in the Spring 2012 shutdown of the accelerator complex. This line consists of an H{sup -} source, low energy beam transport (LEBT), 200 MHz RFQ and medium energy beam transport (MEBT). Beam measurements have been performed to validate the design before installation. The results of the beam measurements are presented in this paper.

  18. NIRSS Upgrades: Final Report

    NASA Technical Reports Server (NTRS)

    Politovich, Marcia K.

    2007-01-01

    This year we were able to further the NIRSS program by re-writing the data ingest and display code from LabVIEW to C++ and Java. This was leveraged by a University of Colorado Computer Science Department Senior Project. The upgrade made the display more portable and upgradeable. Comparisons with research aircraft flights conducted during AIRS-2 were also done and demonstrate reasonable skill in determining cloud altitudes and liquid water distribution. Improvements can still be made to the cloud and liquid logic. The icing hazard index was not evaluated here since that represents work in progress and needs to be made compatible with the new CIP-Severity algorithm. CIP is the Current Icing Potential product that uses a combination decision tree/fuzzy logic algorithm to combine numerical weather model output with operational sensor data (NEXRAD, GOES, METARs and voice pilot reports) to produce an hourly icing diagnosis across the CONUS. The new severity algorithm seeks to diagnose liquid water production through rising, cooling air, and depletion by ice processes. The information used by CIP is very different from that ingested by NIRSS but some common ground does exist. Additionally, the role of NIRSS and the information it both needs and provides needs to be determined in context of the Next Generation Air Traffic System (NGATS). The Weather Integrated Products Team has a plan for an Initial Operating Capability (IOC) to take place in 2012. NIRSS is not explicitly a part of that IOC but should be considered as a follow-on as part of the development path to a 2025 full capability.

  19. Thulium heat source IR D Project 91-031

    SciTech Connect

    Walter, C.E.; Kammeraad, J.E.; Newman, J.G.; Van Konynenburg, R.; VanSant, J.H.

    1991-01-01

    The goal of the Thulium Heat Source study is to determine the performance capability and evaluate the safety and environmental aspects of a thulium-170 heat source. Thulium-170 has several attractive features, including the fact that it decays to a stable, chemically innocuous isotope in a relatively short time. A longer-range goal is to attract government funding for the development, fabrication, and demonstration testing in an Autonomous Underwater Vehicle (AUV) of one or more thulium isotope power (TIP) prototype systems. The approach is to study parametrically the performance of thulium-170 heat source designs in the power range of 5-50 kW{sub th}. At least three heat source designs will be characterized in this power range to assess their performance, mass, and volume. The authors will determine shielding requirements, and consider the safety and environmental aspects of their use.

  20. Resonant Ionization Laser Ion Source Project at TRIUMF

    NASA Astrophysics Data System (ADS)

    Lassen, J.; Bricault, P.; Dombsky, M.; Lavoie, J. P.; Geppert, Ch.; Wendt, K.

    2005-04-01

    Resonant laser excitation and ionisation is one of the most successful tools for the selective production of radioactive ion beams (RIB) at on-line mass separator facilities. TRIUMF plans to augment the current ion sources with a resonant ionisation laser ion source (RILIS), to use the high production yields from the target, as shown by the delivery of 3*104/s 11Li ions from a standard target ion source with surface ionisation. The development and installation of TRIUMF's RILIS (TRILIS) is necessary to provide beams of short lived isotopes that conventional ion sources could not produce in sufficient intensity and purity for nuclear-, and nuclear astrophysics- experiments. A laser system consisting of three tunable titanium sapphire (TiSa) lasers with frequency doubling and tripling was employed to demonstrate first off-line resonance ionisation of Ga, and is being installed for first on-line test and a run on 62Ga in December 2004.

  1. Operational test report integrated system test (ventilation upgrade)

    SciTech Connect

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  2. Cooperative and competitive concurrency in scientific computing. A full open-source upgrade of the program for dynamical calculations of RHEED intensity oscillations

    NASA Astrophysics Data System (ADS)

    Daniluk, Andrzej

    2011-06-01

    problems of this type, the computational and threading layers of the project have been implemented in the form of one design pattern as a part of Model-View-Controller architecture. Reasons for new version: Responding to the users' feedback the Growth09 project has been upgraded to a standard that allows the carrying out of sample computations of the RHEED intensities for a disordered surface for a wide range of single- and epitaxial hetero-structures. The design pattern on which the project is based has also been improved. It is shown that this model can be effectively used for multithreaded growth simulations of thin epitaxial layers and corresponding RHEED intensities for a wide range of single- and hetero-structures. Responding to the users' feedback the present release has been implemented using a well-documented free compiler [1] not requiring the special configuration and installation additional libraries. Summary of revisions: The logical structure of the Growth09 program has been modified according to the scheme showed in Fig. 1. The class diagram in Fig. 1 is a static view of the main platform-specific elements of the GrowthCP architecture. Fig. 2 provides a dynamic view by showing the creation and destruction simplistic sequence diagram for the process. The program requires the user to provide the appropriate parameters in the form of a knowledge base for the crystal structures under investigation. These parameters are loaded from the parameters. ini files at run-time. Instructions to prepare the .ini files can be found in the new distribution. The program enables carrying out different growth models and one-dimensional dynamical RHEED calculations for the fcc lattice with basis of three-atoms, fcc lattice with basis of two-atoms, fcc lattice with single atom basis, Zinc-Blende, Sodium Chloride, and Wurtzite crystalline structures and hetero-structures, but yet the Fourier component of the scattering potential in the TRHEEDCalculations.crystPotUgXXX() procedure

  3. The D0 Upgrade

    SciTech Connect

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  4. EPIC Computer Upgrade

    NASA Video Gallery

    Expedition 30 Commander Dan Burbank and Flight Engineer Don Pettit work on installing hardware for the Enhanced Processor and Integrated Communications (EPIC) upgrade of the International Space Sta...

  5. Project X: A Multi-MW Proton Source at Fermilab

    SciTech Connect

    Holmes, Stephen D.; /Fermilab

    2010-05-01

    As the Fermilab Tevatron Collider program draws to a close a strategy has emerged of an experimental program built around the high intensity frontier. The centerpiece of this program is a superconducting H- linac that will support world leading programs in long baseline neutrino experimentation and he study of rare processes. Based on technology shared with the International Linear Collider (ILC), Project X will provide multi-MW beams at 60-120 GeV from the Main Injector, simultaneous with very high intensity beams at lower energies. Project X will also support development of a Muon Collider as a uture facility at the energy frontier.

  6. Current status of the Taiwan Photon Source project

    SciTech Connect

    Chang, Shih-Lin

    2014-03-05

    The progress of establishment of a high brightness and low emittance mid-energy storage ring is reported. The status of the 3 GeV Taiwan Photon Source (TPS) currently under construction will be presented. The progress on the civil construction, manufacturing of machine components, as well as the opportunity of using low emittace synchrotron source and phase I beamlines at TPS will be mentioned. The future planning of phase II beamlines and related research will be sketched. Future developments will be also briefly outlined.

  7. Hydrocarbonaceous material upgrading method

    SciTech Connect

    Brecher, Lee E.; Mones, Charles G.; Guffey, Frank D.

    2015-06-02

    A hydrocarbonaceous material upgrading method may involve a novel combination of heating, vaporizing and chemically reacting hydrocarbonaceous feedstock that is substantially unpumpable at pipeline conditions, and condensation of vapors yielded thereby, in order to upgrade that feedstock to a hydrocarbonaceous material condensate that meets crude oil pipeline specification.

  8. U.S.-CHINA RADIOLOGICAL SOURCE SECURITY PROJECT: CONTINUING AND EXPANDING BILATERAL COOPERATION

    SciTech Connect

    Zhu, Zhixuan; Zhou, Qifu; Yang, Yaoyun; Huang, Chaoyun; Lloyd, James; Williams, Adam; Feldman, Alexander; Streeper, Charles; Pope, Noah G.; Hawk, Mark; Rawl, Rick; Howell, Randy A.; Kennedy, Catherine

    2009-10-07

    The successful radiological security cooperation between the U.S. and China to secure at-risk sites near venues of the 2008 Beijing Summer Olympics has led to an expanded bilateral nonproliferation cooperation scope. The U.S. Department of Energy’s National Nuclear Security Administration, the Chinese Atomic Energy Authority and the China Ministry of Environmental Protection are continuing joint efforts to secure radiological sources throughout China under the U.S.-China Peaceful Uses of Nuclear Technology (PUNT) Agreement. Joint cooperation activities include physical security upgrades of sites with International Atomic Energy Agency (IAEA) Category 1 radiological sources, packaging, recovery, and storage of high activity transuranic and beta gamma sources, and secure transportation practices for the movement of recovered sources. Expansion of cooperation into numerous provinces within China includes the use of integrated training workshops that will demonstrate methodologies and best practices between U.S. and Chinese radiological source security and recovery experts. The fiscal year 2009 expanded scope of cooperation will be conducted similar to the 2008 Olympic cooperation with the Global Threat Reduction Initiative taking the lead for the U.S., PUNT being the umbrella agreement, and Los Alamos, Sandia, and Oak Ridge National Laboratories operating as technical working groups. This paper outlines the accomplishments of the joint implementation and training efforts to date and discusses the possible impact on future U.S./China cooperation.

  9. Results from the Advanced Photon Source SASE FEL project

    SciTech Connect

    Milton, S.

    2000-07-05

    Measurements of self-amplified spontaneous emission (SASE) at 530 nm were made at the Advanced Photon Source (APS) low-energy undulator test line facility (LEUTL). Exponential growth of the optical signal as a function of distance was measured and compared to theoretical estimates. SASE was first observed using a beam generated from a photocathode rf gun system. It was later repeated using beam from a thermonic rf gun system. Following a brief description of the LEUTL facility, they present their results and initial analysis.

  10. Laser ion source for ITEP-TWAC project

    NASA Astrophysics Data System (ADS)

    Balabaev, A.; Kondrashev, S.; Sharkov, B.; Vasiliev, A.

    2005-10-01

    Laser ion source (LIS) is the only type of source capable of generating 10-30 mA beams of highly charged ions for the ITEP-TeraWatt (TWAC) accelerator/accumulator facility [B.Yu. Sharkov et al ., Nucl. Instrum. Methods Phys. Res. A 415 20 (1998).]. The assembling stage of the new LIS based on 100 J/1 Hz master oscillator-power amplifier CO2-laser system [Yu. Satov, et al ., J. Russ. Laser Res. 25(3) 205 (2004).] is in progress at ITEP now. In the first phase, the ion beam parameters (charge state distribution, current, pulse length and emittance) will be specified for different elements and target irradiation conditions. According to the planning, the new LIS and the new high-current injector [D. Kashinsky, et al ., Proceedings of the Heavy Ion Fusion Conference, Moskow (2002).] will be used to deliver the beams of highly charged ions for the ITEP-TWAC accelerator/accumulator facility.

  11. Upgrade of Compressed Air Control System Reduces Energy Costs at Michelin Tire Plant

    SciTech Connect

    2002-01-01

    This case study highlights the upgraded compressed air system at a Michelin tire manufacturing plant in Spartanburg, South Carolina. The controls upgrade project enabled multiple compressor operation without blow-off, and significantly reduced energy costs.

  12. High temperature ceramic membrane reactors for coal liquid upgrading

    SciTech Connect

    Tsotsis, T.T.

    1992-06-19

    In this project we well evaluate the performance of Sel-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. In addition, the development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will be also investigated. (VC)

  13. The Manuscript as Question: Teaching Primary Sources in the Archives--The China Missions Project

    ERIC Educational Resources Information Center

    McCoy, Michelle

    2010-01-01

    The collaborative effort between two Special Collections librarians and a history professor at DePaul University led to a quarter-long undergraduate project in the archives using China Missions Correspondence. In a reversal of traditional methods that assumes archival use to answer a question, this project looks at the document as the source of…

  14. The High Flux Isotope Reactor (HFIR) cold source project at ORNL

    SciTech Connect

    Selby, D.

    1998-05-01

    The scope of this project includes the development, design, procurement/fabrication, testing, and installation of all of the components necessary to produce a working cold source within an existing HFIR beam tube hole in the pressure vessel. All aspects of the cold source design will be based on demonstrated technology adapted to the HFIR design and operating conditions.

  15. Creating a Project on Difference Equations with Primary Sources: Challenges and Opportunities

    ERIC Educational Resources Information Center

    Ruch, David

    2014-01-01

    This article discusses the creation of a student project about linear difference equations using primary sources. Early 18th-century developments in the area are outlined, focusing on efforts by Abraham De Moivre (1667-1754) and Daniel Bernoulli (1700-1782). It is explained how primary sources from these authors can be used to cover material…

  16. VISIR upgrade overview and status

    NASA Astrophysics Data System (ADS)

    Kerber, Florian; Käufl, Hans Ulrich; Baksai, Pedro; Dobrzycka, Danuta; Finger, Gert; Ives, Derek; Jakob, Gerd; Lagadec, Eric; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Moerchen, Margaret; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Siebenmorgen, Ralf; Silber, Armin; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Venema, Lars; Weilenmann, Ueli; Yegorova, Irina

    2012-09-01

    We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As Aquarius detector array (Raytheon) which has demonstrated very good performance (sensitivity, stability) in the laboratory IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a userdefined constraint on water vapour. Improved pipelines based on the ESO Reflex concept will provide better support to astronomers. The upgraded VISIR will be a powerful instrument providing background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes. The intervention on VISIR and installation of hardware has been completed in July and commissioning will take place during July and August. VISIR is scheduled to be available to the users starting Oct 2012.

  17. SOURCE TERM TARGETED THRUST FY 2005 NEW START PROJECTS

    SciTech Connect

    NA

    2005-10-05

    While a significant amount of work has been devoted to developing thermodynamic data. describing the sorption of radionuclides to iron oxides and other geomedia, little data exist to describe the interaction of key radionuclides found in high-level radioactive waste with the uranium surfaces expected in corroded spent nuclear fuel (SNF) waste packages. Recent work indicates that actinide adsorption to the U(VI) solids expected in the engineered barrier system may play a key role in the reduction of dissolved concentrations of radionuclides such as Np(V). However, little is known about the mechanism(s) of adsorption, nor are the thermodynamic data available to represent the phenomenon in predictive modeling codes. Unfortunately, this situation makes it difficult to consider actinide adsorption to the U(VI) silicates in either geochemical or performance assessment (PA) predictions. The primary goal in the Source Term Targeted Thrust area is to ''study processes that control radionuclide release from the waste form''. Knowledge of adsorption of actinides to U(VI) silicate solids its and parameterization in geochemical models will be an important step towards this goal.

  18. Learning from open source software projects to improve scientific review

    PubMed Central

    Ghosh, Satrajit S.; Klein, Arno; Avants, Brian; Millman, K. Jarrod

    2012-01-01

    Peer-reviewed publications are the primary mechanism for sharing scientific results. The current peer-review process is, however, fraught with many problems that undermine the pace, validity, and credibility of science. We highlight five salient problems: (1) reviewers are expected to have comprehensive expertise; (2) reviewers do not have sufficient access to methods and materials to evaluate a study; (3) reviewers are neither identified nor acknowledged; (4) there is no measure of the quality of a review; and (5) reviews take a lot of time, and once submitted cannot evolve. We propose that these problems can be resolved by making the following changes to the review process. Distributing reviews to many reviewers would allow each reviewer to focus on portions of the article that reflect the reviewer's specialty or area of interest and place less of a burden on any one reviewer. Providing reviewers materials and methods to perform comprehensive evaluation would facilitate transparency, greater scrutiny, and replication of results. Acknowledging reviewers makes it possible to quantitatively assess reviewer contributions, which could be used to establish the impact of the reviewer in the scientific community. Quantifying review quality could help establish the importance of individual reviews and reviewers as well as the submitted article. Finally, we recommend expediting post-publication reviews and allowing for the dialog to continue and flourish in a dynamic and interactive manner. We argue that these solutions can be implemented by adapting existing features from open-source software management and social networking technologies. We propose a model of an open, interactive review system that quantifies the significance of articles, the quality of reviews, and the reputation of reviewers. PMID:22529798

  19. Learning from open source software projects to improve scientific review.

    PubMed

    Ghosh, Satrajit S; Klein, Arno; Avants, Brian; Millman, K Jarrod

    2012-01-01

    Peer-reviewed publications are the primary mechanism for sharing scientific results. The current peer-review process is, however, fraught with many problems that undermine the pace, validity, and credibility of science. We highlight five salient problems: (1) reviewers are expected to have comprehensive expertise; (2) reviewers do not have sufficient access to methods and materials to evaluate a study; (3) reviewers are neither identified nor acknowledged; (4) there is no measure of the quality of a review; and (5) reviews take a lot of time, and once submitted cannot evolve. We propose that these problems can be resolved by making the following changes to the review process. Distributing reviews to many reviewers would allow each reviewer to focus on portions of the article that reflect the reviewer's specialty or area of interest and place less of a burden on any one reviewer. Providing reviewers materials and methods to perform comprehensive evaluation would facilitate transparency, greater scrutiny, and replication of results. Acknowledging reviewers makes it possible to quantitatively assess reviewer contributions, which could be used to establish the impact of the reviewer in the scientific community. Quantifying review quality could help establish the importance of individual reviews and reviewers as well as the submitted article. Finally, we recommend expediting post-publication reviews and allowing for the dialog to continue and flourish in a dynamic and interactive manner. We argue that these solutions can be implemented by adapting existing features from open-source software management and social networking technologies. We propose a model of an open, interactive review system that quantifies the significance of articles, the quality of reviews, and the reputation of reviewers. PMID:22529798

  20. Synchrotron radiation sources and condensers for projection x-ray lithography

    SciTech Connect

    Murphy, J.B.; MacDowell, A.A. ); White, D.L. ); Wood, O.R. II )

    1992-01-01

    The design requirements for a compact electron storage ring that could be used as a soft x-ray source for projection lithography are discussed. The design concepts of the x-ray optics that are required to collect and condition the radiation in divergence, uniformity and direction to properly illuminate the mask and the particular x-ray projection camera used are discussed. Preliminary designs for an entire soft x-ray projection lithography system using an electron storage ring as a soft X-ray source are presented. It is shown that by combining the existing technology of storage rings with large collection angle condensers, a powerful and reliable source of 130[Angstrom] photons for production line projection x-ray lithography is possible.

  1. Synchrotron radiation sources and condensers for projection x-ray lithography

    SciTech Connect

    Murphy, J.B.; MacDowell, A.A.; White, D.L.; Wood, O.R. II

    1992-11-01

    The design requirements for a compact electron storage ring that could be used as a soft x-ray source for projection lithography are discussed. The design concepts of the x-ray optics that are required to collect and condition the radiation in divergence, uniformity and direction to properly illuminate the mask and the particular x-ray projection camera used are discussed. Preliminary designs for an entire soft x-ray projection lithography system using an electron storage ring as a soft X-ray source are presented. It is shown that by combining the existing technology of storage rings with large collection angle condensers, a powerful and reliable source of 130{Angstrom} photons for production line projection x-ray lithography is possible.

  2. The D0 upgrade

    SciTech Connect

    Gruenendahl, S.; The D0 Collaboration

    1994-01-01

    In order to maximize the physics potential of the Fermilab Tevatron proton antiproton collider complex, both the accelerator system and the two large collider detectors are undergoing major upgrades during the remainder of this decade. For the D0 detector, the upgrade focuses on implementation of an integrated magnetic tracker in the central region of the detector, accompanied by those modifications to other parts of the apparatus necessary to cope with the increase in interaction rate provided by the collider.

  3. Optics upgrade for switchyard

    SciTech Connect

    Kobilarcik, Thomas R.; /Fermilab

    2005-08-01

    An upgrade of the Switchyard optics is proposed. This upgrade extends the P3 (old Main Ring) lattice through enclosure C. The septa for the 3-way Meson Area split is moved from enclosure F1 to enclosure M01. The functionality of the Meson Target Train is preserved. Finally, for the purpose of demonstrating that the resulting split can be transported, a straw-man lattice is proposed for enclosure M02 and beyond.

  4. A laser-plasma clean soft x-ray source for projection microlithography

    NASA Astrophysics Data System (ADS)

    Bollanti, S.; Di Lazzaro, P.; Flora, F.; Mezi, L.; Murra, D.; Torre, A.

    2008-10-01

    Within a National Project on nanotechnologies, at the ENEA Research Centre in Frascati a micro-exposure tool for projection lithography at 14.4 nm has been developed. The laser-plasma soft X-ray source is equipped with a patented debris mitigation system developed in the frame of a European Integrated Project, in order to preserve the collecting optics. A 90-nm-resolution patterning has been achieved on resist by this laboratory-scale tool based on a Schwarzschildtype projection optics.

  5. Projection of needs for gamma radiation sources and other radioisotopes and assessment of alternatives for providing radiation sources

    SciTech Connect

    Ross, W.A.; Jensen, G.A.; Clark, L.L.; Eakin, D.E.; Jarrett, J.H.; Katayama, Y.B.; McKee, R.W.; Morgan, L.G.; Nealey, S.M.; Platt, A.M.; Tingey, G.L.

    1989-06-01

    Pacific Northwest Laboratory reviewed the projected uses and demands for a variety of nuclear byproducts. Because the major large-scale near-term demand is for gamma irradiation sources, this report concentrates on the needs for gamma sources and evaluates the options for providing the needed material. Projections of possible growth in the irradiation treatment industry indicate that there will be a need for 180 to 320 MCi of /sup 60/Co (including /sup 137/Cs equivalent) in service in the year 2000. The largest current and projected use of gamma irradiation is for the sterilization of medical devices and disposable medical supplies. Currently, 40% of US disposable medical products are treated by irradiation, and within 10 years it is expected that 90% will be treated in this manner. Irradiation treatment of food for destruction of pathogens or parasites, disinfestation, or extension of allowable storage periods is estimated to require an active inventory of 75 MCi of /sup 60/Co-equivalent gamma source in about a decade. 90 refs., 7 figs., 25 tabs.

  6. VISIR upgrade overview and status

    NASA Astrophysics Data System (ADS)

    Kerber, Florian; Käufl, Hans-Ulrich; Baksai, Pedro; Di Lieto, Nicola; Dobrzycka, Danuta; Duhoux, Philippe; Finger, Gert; Heikamp, Stephanie; Ives, Derek; Jakob, Gerd; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Sandrock, Stefan; Siebenmorgen, Ralf; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Valdes, Guillermo; Venema, Lars; Weilenmann, Ueli

    2014-07-01

    We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As AQUARIUS detector array (Raytheon) which has been carefully characterized in ESO's IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a user-defined constraint on water vapour. During the commissioning in 2012 it was found that the on-sky sensitivity of the AQUARIUS detector was significantly below expectations and that VISIR was not ready to go back to science operations. Extensive testing of the detector arrays in the laboratory and on-sky enabled us to diagnose the cause for the shortcoming of the detector as excess low frequency noise (ELFN). It is inherent to the design chosen for this detector and can't be remedied by changing the detector set-up. Since this is a form of correlated noise its impact can be limited by modulating the scene recorded by the detector. We have studied several mitigation options and found that faster chopping using the secondary mirror (M2) of the VLT offers the most promising way forward. Faster M2 chopping has been tested and is scheduled for implementation before the end of 2014

  7. Current status of new SAGE project with 51Cr neutrino source

    NASA Astrophysics Data System (ADS)

    Gavrin, V.; Cleveland, B.; Danshin, S.; Elliott, S.; Gorbachev, V.; Ibragimova, T.; Kalikhov, A.; Knodel, T.; Kozlova, Yu.; Malyshkin, Yu.; Matveev, V.; Mirmov, I.; Nico, J.; Robertson, R. G. H.; Shikhin, A.; Sinclair, D.; Veretenkin, E.; Wilkerson, J.

    2015-03-01

    A very short-baseline neutrino oscillation experiment with an intense 51Cr neutrino source is currently under construction at the Baksan Neutrino Observatory of the Institute for Nuclear Research RAS (BNO). The experiment, which is based on the existing SAGE experiment, will use an upgraded Gallium-Germanium Neutrino Telescope (GGNT) and an artificial 51Cr neutrino source with activity ˜3 MCi to search for transitions of active neutrinos to sterile states with Δ m 2 ˜1 eV2. The neutrino source will be placed in the center of a liquid Ga metal target that is divided into two concentric zones, internal and external. The average path length of neutrinos in each zone will be the same and the neutrino capture rate will be measured separately in each zone. The oscillation signature, which comes from the ratio of events in the near and far gallium volumes, will be largely free of systematic errors, such as may occur from cross section and source strength uncertainties, and will provide a clean signal of electron neutrino disappearance into a sterile state at baselines of about 0.6 and 2.0 m. The sensitivity to the disappearance of electron neutrinos is expected to be a few percent. Construction of this set of new facilities, including a two-zone tank for irradiation of 50 tons of Ga metal with the intense 51Cr source, as well as additional modules of the GGNT counting and extraction systems, is close to completion. To check the new facilities they will first be used for SAGE solar neutrino measurements.

  8. Motivational Potential for Upgrading Among Minority and Female Managers

    ERIC Educational Resources Information Center

    Miner, John B.

    1977-01-01

    The data suggest that minority males might provide a major source of potential talent for upgrading into middle-management levels and above and also yield no support for the hypothesis that white female managerial potential for upgrading is less than that of white male managers. (Author)

  9. PMOG: the projected mixture of Gaussians model with application to blind source separation.

    PubMed

    Pendse, Gautam V

    2012-04-01

    We extend the mixtures of Gaussians (MOG) model to the projected mixture of Gaussians (PMOG) model. In the PMOG model, we assume that q dimensional input data points z(i) are projected by a q dimensional vector w into 1-D variables u(i). The projected variables u(i) are assumed to follow a 1-D MOG model. In the PMOG model, we maximize the likelihood of observing u(i) to find both the model parameters for the 1-D MOG as well as the projection vector w. First, we derive an EM algorithm for estimating the PMOG model. Next, we show how the PMOG model can be applied to the problem of blind source separation (BSS). In contrast to conventional BSS where an objective function based on an approximation to differential entropy is minimized, PMOG based BSS simply minimizes the differential entropy of projected sources by fitting a flexible MOG model in the projected 1-D space while simultaneously optimizing the projection vector w. The advantage of PMOG over conventional BSS algorithms is the more flexible fitting of non-Gaussian source densities without assuming near-Gaussianity (as in conventional BSS) and still retaining computational feasibility. PMID:22391233

  10. Full data consistency conditions for cone-beam projections with sources on a plane.

    PubMed

    Clackdoyle, Rolf; Desbat, Laurent

    2013-12-01

    Cone-beam consistency conditions (also known as range conditions) are mathematical relationships between different cone-beam projections, and they therefore describe the redundancy or overlap of information between projections. These redundancies have often been exploited for applications in image reconstruction. In this work we describe new consistency conditions for cone-beam projections whose source positions lie on a plane. A further restriction is that the target object must not intersect this plane. The conditions require that moments of the cone-beam projections be polynomial functions of the source positions, with some additional constraints on the coefficients of the polynomials. A precise description of the consistency conditions is that the four parameters of the cone-beam projections (two for the detector, two for the source position) can be expressed with just three variables, using a certain formulation involving homogeneous polynomials. The main contribution of this work is our demonstration that these conditions are not only necessary, but also sufficient. Thus the consistency conditions completely characterize all redundancies, so no other independent conditions are possible and in this sense the conditions are full. The idea of the proof is to use the known consistency conditions for 3D parallel projections, and to then apply a 1996 theorem of Edholm and Danielsson that links parallel to cone-beam projections. The consistency conditions are illustrated with a simulation example. PMID:24240245

  11. Preparation for upgrading western subbituminous coal

    SciTech Connect

    Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

    1990-11-01

    The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

  12. The SPARX Project: R & D Activity Towards X-Rays FEL Sources

    SciTech Connect

    Alesini, D.; Bellaveglia, M.; Bertolucci, S.; Biagini, M.E.; Boni, R.; Boscolo, M.; Castellano, M.; Clozza, A.; Di Pirro, G.; Drago, A.; Esposito, A.; Ferrario, M.; Filippetto, D.; Fusco, V.; Gallo, A.; Ghigo, A.; Guiducci, S.; Incurvati, M.; Ligi, C.; Marcellini, F.; Migliorati, M.; /Frascati /ENEA, Frascati /INFN, Milan /INFN, Rome /INFN, Rome2 /Milan Polytechnic /UCLA /SLAC

    2005-08-05

    SPARX is an evolutionary project proposed by a collaboration among ENEA-INFN-CNR-Universita di Roma Tor Vergata aiming at the construction of a FELSASE X-ray source in the Tor Vergata Campus. The first phase of the SPARX project, funded by Government Agencies, will be focused on R&D activity on critical components and techniques for future X-ray facilities as described in this paper.

  13. Modern hydrocracking is the key to upgrading processes

    SciTech Connect

    Corbett, R.A.

    1989-06-26

    Hydrocracking technology is the key to Canada's heavy oil and bitumen upgrading facilities that have recently started or are due to start up during the next few years. The upgrader at Consumers' Cooperative Refineries Ltd. in Regina Sask.; the capacity addition program (CAP) at Syncrude Canada Ltd.'s Fort McMurray, Alta., plant; Husky Oil Operations Ltd.'s Bi-Provincial upgrader to be built near Lloydminster, Sask.; and the OSLO project to be built near Fort McMurray, all rely on this modern technology for primary upgrading. All of the projects are designed to upgrade heavy oil and bitumen extracted from oil sands to a high-quality synthetic crude oil (SCO) that is a blend of high-quality naphtha and gas oil.

  14. Paired MEG data set source localization using recursively applied and projected (RAP) MUSIC.

    PubMed

    Ermer, J J; Mosher, J C; Huang, M; Leahy, R M

    2000-09-01

    An important class of experiments in functional brain mapping involves collecting pairs of data corresponding to separate "Task" and "Control" conditions. The data are then analyzed to determine what activity occurs during the Task experiment but not in the Control. Here we describe a new method for processing paired magnetoencephalographic (MEG) data sets using our recursively applied and projected multiple signal classification (RAP-MUSIC) algorithm. In this method the signal subspace of the Task data is projected against the orthogonal complement of the Control data signal subspace to obtain a subspace which describes spatial activity unique to the Task. A RAP-MUSIC localization search is then performed on this projected data to localize the sources which are active in the Task but not in the Control data. In addition to dipolar sources, effective blocking of more complex sources, e.g., multiple synchronously activated dipoles or synchronously activated distributed source activity, is possible since these topographies are well-described by the Control data signal subspace. Unlike previously published methods, the proposed method is shown to be effective in situations where the time series associated with Control and Task activity possess significant cross correlation. The method also allows for straightforward determination of the estimated time series of the localized target sources. A multiepoch MEG simulation and a phantom experiment are presented to demonstrate the ability of this method to successfully identify sources and their time series in the Task data. PMID:11008426

  15. Antenna feedhorn software upgrade

    NASA Technical Reports Server (NTRS)

    Potter, P. D.

    1979-01-01

    The HYBRIDHORN computer program was developed to serve as an item of general purpose antenna feedhorn design and analysis software. The formulation contains a small flare angle approximation which is subject to question for designs such as the S- and X-band feedhorn. Additionally, the original formulation did not allow azimuthal variation indexes other than unity. The HYBRIDHORN program was upgraded to correct both of these deficiencies. A large flare angle formulation was found. In the upgrade, all of the major program elements were converted to Univac 1108 compatible structured FORTRAN (SFTRAN) for ease of software maintenance. The small and large angle formulations are described and sample numerical results are presented.

  16. The Jefferson Lab 12 GeV Upgrade

    SciTech Connect

    R.D. McKeown

    2011-10-01

    A major upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is in progress. Construction began in 2008 and the project should be completed in 2015. The upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and new experimental equipment in three of the experimental halls. A brief overview of this upgrade project is presented along with some highlights of the anticipated experimental program.

  17. National funding initiatives for laser technology in Germany: projects on brilliant laser sources and their applications

    NASA Astrophysics Data System (ADS)

    Bachmann, Friedrich

    2010-09-01

    Germany's leading role in laser technology is not least a consequence of successful national precompetitive joint development projects between industry and science: Funding of laser technology in Germany is strongly performed by the German Federal Ministry of Education and Research (BMBF) and has already been started in the second half of the eighties of last century. Since then several programs matched to the actual technological status and the future requirements of the market have been run: whilst activities have been focused on gas lasers in the beginning, today - in the actual research funding program "optical technologies" - semiconductor lasers and diode pumped lasers are in the center of interest. More than ever before relevance of the development to applications must be integrated into the projects. Consequently, in most projects lasers source development and application of novel brilliant laser sources are combined. This has been successfully performed in the BRIOLAS (Brilliant Diode Lasers) initiative, which has been launched in 2004 and will come to an end in 2010. Based on the knowledge and experience gained in the 13 projects of the BRIOLAS initiative, two new initiatives have been launched in 2008, namely INLAS (Integrated Optical Components for High Power Laser Beam Sources) and MABRILAS (Material Processing with Brilliant Laser Beam Sources).

  18. National funding initiatives for laser technology in Germany: projects on brilliant laser sources and their applications

    NASA Astrophysics Data System (ADS)

    Bachmann, Friedrich

    2011-02-01

    Germany's leading role in laser technology is not least a consequence of successful national precompetitive joint development projects between industry and science: Funding of laser technology in Germany is strongly performed by the German Federal Ministry of Education and Research (BMBF) and has already been started in the second half of the eighties of last century. Since then several programs matched to the actual technological status and the future requirements of the market have been run: whilst activities have been focused on gas lasers in the beginning, today - in the actual research funding program "optical technologies" - semiconductor lasers and diode pumped lasers are in the center of interest. More than ever before relevance of the development to applications must be integrated into the projects. Consequently, in most projects lasers source development and application of novel brilliant laser sources are combined. This has been successfully performed in the BRIOLAS (Brilliant Diode Lasers) initiative, which has been launched in 2004 and will come to an end in 2010. Based on the knowledge and experience gained in the 13 projects of the BRIOLAS initiative, two new initiatives have been launched in 2008, namely INLAS (Integrated Optical Components for High Power Laser Beam Sources) and MABRILAS (Material Processing with Brilliant Laser Beam Sources).

  19. The Athabasca University eduSource Project: Building an Accessible Learning Object Repository

    ERIC Educational Resources Information Center

    Cleveland-Innes, Martha; McGreal, Rory; Anderson, Terry; Friesen, Norm; Ally, Mohamed; Tin, Tony; Graham, Rodger; Moisey, Susan; Petrinjak, Anita; Schafer, Steve

    2005-01-01

    Athabasca University--Canada's Open University (AU) made the commitment to put all of its courses online as part of its Strategic University Plan. In pursuit of this goal, AU participated in the eduSource project, a pan-Canadian effort to build the infrastructure for an interoperable network of learning object repositories. AU acted as a leader in…

  20. Tensor calculus with open-source software: the SageManifolds project

    NASA Astrophysics Data System (ADS)

    Gourgoulhon, Eric; Bejger, Michal; Mancini, Marco

    2015-04-01

    The SageManifolds project aims at extending the mathematics software system Sage towards differential geometry and tensor calculus. Like Sage, SageManifolds is free, open- source and is based on the Python programming language. We discuss here some details of the implementation, which relies on Sage's parent/element framework, and present a concrete example of use.

  1. Automated Retrieval from Multiple Disparate Information Sources: The World Wide Web and the NLM's Sourcerer Project.

    ERIC Educational Resources Information Center

    Rodgers, R. P. Channing

    1995-01-01

    Describes the National Library of Medicine's (NLM) experimental Sourcerer project which is developing software to accept a user query, automatically identifying appropriate information resources, and facilitating connection to those sources for information retrieval. Discusses the use of the World Wide Web and the Unified Medical Language System.…

  2. Operation status and upgrading of HIRFL

    NASA Astrophysics Data System (ADS)

    Tang, J. Y.; Wang, Y. F.; Wei, B. W.

    2001-12-01

    The operation status and the undergoing upgrading at HIRFL machine are presented. The accelerated ion species with the machine have been expanding, including metallic ions and higher energy with the new ECR ion source. The upgrading of HIRFL as the pre-accelerator of CSR storage ring has been processing steadily. The new 14.5 GHz ECR ion source has been put in operation in early 1999. A full-superconducting ECR ion source of 18 GHz is under design. The manufacture of the new vacuum chamber for SFC is just finished and the installation is to be started. The construction of the new B1 buncher is nearly to be finished, and the off-line test and the installation will be started soon. Another two identical bunchers will be ordered after the test. The beam distribution system is under upgrading to make all experiment stations separate from the others and the time-sharing mode possible, and a new cancer-therapy station is also under construction. The other upgrading items include the yoke enlarging of SFC, beam diagnostics, computer control and beam distribution system.

  3. Identification of radwaste sources and reduction techniques. Volume 2. Project evaluation. Final report

    SciTech Connect

    Deltete, C.P.; Daloisio, G.S.; Wilson, R.B.

    1984-01-01

    The Electric Power Research Institute (EPRI) commissioned an operations-related project in late 1981 to develop a methodology which can be used by utility operations managers in evaluating the radwaste generation rates at their nuclear stations, and to help them identify successful volume minimization techniques which can be applied to reduce these radwaste sources. The result of the project is a three volume report comprising radwaste related information from over two-thirds of the operating nuclear power plants in the country as of December 31, 1981. Volume 1 is intended to serve primarily as a handbook and includes: 1) the major conclusions obtained throughout the report; 2) a method to evaluate a plant's waste management program effectiveness in minimizing radwaste generation in comparison to industry performance; and 3) radwaste volume minimization techniques successfully used at operational nuclear stations. Volume 2 describes the project's technical approach, and provides detailed evaluations of the waste source/characteristics data gathered during the project; while Volume 3 provides the entire computerized data base of plant waste sources and characteristics used in the project. 53 references, 105 figures, 48 tables.

  4. Source-domain spectral EEG analysis of sports-related concussion via Measure Projection Analysis.

    PubMed

    Balkan, Ozgur; Virji-Babul, Naznin; Miyakoshi, Makoto; Makeig, Scott; Garudadri, Harinath

    2015-01-01

    Here, we investigated EEG-based source-level spectral differences between adolescents with sports-related concussions and healthy age matched controls. We transformed resting state EEG collected in both groups to the source domain using Independent Component Analysis (ICA) and computed the component process power spectra. For group-level analysis in the source domain, we used a probabilistic framework, Measure Projection Analysis (MPA), that has advantages over parametric k-means clustering of brain sources. MPA revealed that some frontal brain sources in the concussed group had significantly more power in the beta band (p<;0.005) and significantly less delta (p<;0.01) and theta band power (p<;0.05) than the healthy control group. These results suggest that a shift in spectral profile toward higher frequencies in some frontal brain regions might distinguish individuals with concussion from healthy controls. PMID:26737184

  5. Use of Project MOHAVE perfluorocarbon tracer data to evaluate source and receptor models.

    PubMed

    Green, M C; Tombach, I

    2000-05-01

    Project MOHAVE was a major monitoring, modeling, and data analysis study whose objectives included the estimation of the contributions of the Mohave Power Project (MPP) and other sources to visibility impairment in the southwestern United States, in particular at Grand Canyon National Park. A major element of Project MOHAVE was the release of perfluorocarbon tracers at MPP and other locations during 50-day summer and 30-day winter intensive study periods. Tracer data (from about 30 locations) were sequestered until several source and receptor models were used to predict tracer concentrations. None of the models was successful in predicting the tracer concentrations; squared correlation coefficients between predicted and measured tracer were all less than 0.2, and most were less than 0.1. PMID:10842936

  6. Biochemical upgrading of oils

    DOEpatents

    Premuzic, Eugene T.; Lin, Mow S.

    1999-01-12

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing in organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed.

  7. Upgrading Undergraduate Biology Education

    ERIC Educational Resources Information Center

    Musante, Susan

    2011-01-01

    On many campuses throughout the country, undergraduate biology education is in serious need of an upgrade. During the past few decades, the body of biological knowledge has grown exponentially, and as a research endeavor, the practice of biology has evolved. Education research has also made great strides, revealing many new insights into how…

  8. Biochemical upgrading of oils

    DOEpatents

    Premuzic, E.T.; Lin, M.S.

    1999-01-12

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

  9. Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet)

    SciTech Connect

    Not Available

    2012-11-01

    The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades, establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

  10. On the dominant uncertainty source of climate change projections at the local scale

    NASA Astrophysics Data System (ADS)

    Fatichi, Simone; Ivanov, Valeriy; Paschalis, Athanasios; Molnar, Peter; Rimkus, Stefan; Kim, Jongho; Peleg, Nadav; Burlando, Paolo; Caporali, Enrica

    2016-04-01

    Decision makers and stakeholders are usually concerned about climate change projections at local spatial scales and fine temporal resolutions. This contrasts with the reliability of climate models, which is typically higher at the global and regional scales, Therefore, there is a demand for advanced methodologies that offer the capability of transferring predictions of climate models and relative uncertainty to scales commensurate with practical applications and for higher order statistics (e.g., few square kilometres and sub-daily scale). A stochastic downscaling technique that makes use of an hourly weather generator (AWE-GEN) and of a Bayesian methodology to weight realizations from different climate models is used to generate local scale meteorological time series of plausible "futures". We computed factors of change from realizations of 32 climate models used in the Coupled Model Intercomparison Project Phase 5 (CMIP5) and for different emission scenarios (RCP 4.5 and RCP 8.5). Future climate projections for several meteorological variables (precipitation, air temperature, relative humidity, shortwave radiation) are simulated at three locations characterized by remarkably different climates, Zurich (Switzlerand), Miami and San Francisco (USA). The methodology is designed to partition three main sources of uncertainty: uncertainty due to climate models (model epistemic uncertainty), anthropogenic forcings (scenario uncertainty), and internal climate variability (stochastic uncertainty). The three types of uncertainty sources are considered as dependent, implicitly accounting for possible co-variances among the sources. For air temperature, the magnitude of the different uncertainty sources is comparable for mid-of-the-century projections, while scenario uncertainty dominates at large lead-times. The dominant source of uncertainty for changes in precipitation mean and extremes is internal climate variability, which is accounting for more than 80% of the total