Science.gov

Sample records for system interim technical

  1. 200 Area Interim Storage Area Technical Safety Requirements

    SciTech Connect

    CARRELL, R.D.

    2000-03-15

    The 200 Area Interim Storage Area Technical Safety Requirements define administrative controls and design features required to ensure safe operation during receipt and storage of canisters containing spent nuclear fuel. This document is based on the 200 Area Interim Storage Area, Annex D, Final Safety Analysis Report which contains information specific to the 200 Area Interim Storage Area.

  2. Compilation of interim technical research memoranda. Volume I

    SciTech Connect

    Shanahan, W.R.

    1984-04-01

    Four interim technical research memoranda are presented that describe the results of numerical simulations designed to investigate the dynamics of energetic plasma beams propagating across magnetic fields.

  3. Control system failure monitoring using generalized parity relations. M.S. Thesis Interim Technical Report

    NASA Technical Reports Server (NTRS)

    Vanschalkwyk, Christiaan Mauritz

    1991-01-01

    Many applications require that a control system must be tolerant to the failure of its components. This is especially true for large space-based systems that must work unattended and with long periods between maintenance. Fault tolerance can be obtained by detecting the failure of the control system component, determining which component has failed, and reconfiguring the system so that the failed component is isolated from the controller. Component failure detection experiments that were conducted on an experimental space structure, the NASA Langley Mini-Mast are presented. Two methodologies for failure detection and isolation (FDI) exist that do not require the specification of failure modes and are applicable to both actuators and sensors. These methods are known as the Failure Detection Filter and the method of Generalized Parity Relations. The latter method was applied to three different sensor types on the Mini-Mast. Failures were simulated in input-output data that were recorded during operation of the Mini-Mast. Both single and double sensor parity relations were tested and the effect of several design parameters on the performance of these relations is discussed. The detection of actuator failures is also treated. It is shown that in all the cases it is possible to identify the parity relations directly from input-output data. Frequency domain analysis is used to explain the behavior of the parity relations.

  4. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  5. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    SciTech Connect

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  6. Wind-powered electric generation runway lighting system demonstration project. Interim final technical report, September 15, 1981-December 15, 1983

    SciTech Connect

    Mesa, D.

    1984-01-01

    The project is a small scale demonstration project to determine the feasibility of using wind-powered generation of electricity to operate the runway lighting system at Half Moon Bay Airport. The airport is located in San Mateo County near Highway 1, approximately 15 miles south of San Francisco, California. The project is a joint effort of San Mateo County, the California Department of Transportation, Division of Aeronautics, and the United States Department of Energy. The concept of wind-powered turbines to produce electrical power, which is not new or unique, has been demonstrated many times. This project seeks to determine if wind power has practical application to an airport environment as a cost-effective means of providing an alternate source of energy. Should the results of this demonstration be positive, the technology can be applied to airports statewide which possess the meteorological conditions conducive to wind power generation. Concurrently included in the demonstration project, and funded separately, is the construction of a runway lighting system designed for low energy use. The total system is tied into PG and E's grid system.

  7. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    SciTech Connect

    CONRAD EA

    2008-08-12

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel.

  8. Emergency Operating Procedures Tracking System: Interim report

    SciTech Connect

    Petrick, W.; Ng, K.B.

    1987-06-01

    This interim report describes the work performed in the Emergency Operating Procedure Tracking System project through December 1986. An Executive Summary (Part 1) provides a high level description of the application and project task description; Functional Specifications (Part II) and Detailed Design Specifications (Part III) give a detailed description of the form and function of the Emergency Operating Procedure Tracking System software. Appendices containing a complete compilation of the rules logic, output messages and version of the Kuo Sheng plant emergency operating procedures are used as a source in the full prototype implementation.

  9. Radon Reduction Techniques in Schools: Interim Technical Guidance.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC.

    This technical document is intended to assist school facilities maintenance personnel in the selection, design, and operation of radon reduction systems in schools. The guidance contained in this document is based largely on research conducted in 1987 and 1988 in schools located in Maryland and Virginia. Researchers from the United States…

  10. Interim assessment of the VAL automated guideway transit system. Interim report

    SciTech Connect

    Anagnostopoulos, G.

    1981-11-01

    This report describes an interim assessment of the VAL (Vehicules Automatiques Legers or Light Automated Vehicle) AGT system which is currently under construction in Lille, France, and which is to become fully operational in December 1983. This report contains a technical description and performance data resulting from a demonstration test program performed concurrently in August 1980. VAL is the first driverless AGT urban system application in France. The system operates at grade, elevated, and in tunnels on an exclusive concrete dual-lane guideway that is 12.7 kilometers long. The configuration of the system is a push-pull loop operating between 17 on-line stations. The system is designed to provide scheduled operation at 60-second headways and a normal one-way capacity of 7440 passengers per hour per direction with 55 percent of the passengers seated. Two pneumatic-tired vehicles are coupled into a single vehicle capable of carrying 124 passengers at line speeds of 60 km/hr. During the course of the demonstration test program, VAL demonstrated that it could achieve high levels of dependability and availability and could perform safely under all perceivable conditions.

  11. Spent Fuel Test - Climax: technical measurements. Interim report, fiscal year 1982

    SciTech Connect

    Patrick, W.C.; Ballou, L.B.; Butkovich, T.R.; Carlson, R.C.; Durham, W.B.; Hage, G.L.; Majer, E.L.; Montan, D.N.; Nyholm, R.A.; Rector, N.L.

    1983-02-01

    The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on the Nevada Test Site. The test is being conducted for the US Department of Energy (DOE) under the technical direction of the Lawrence Livermore National Laboratory (LLNL). Eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized April to May 1980, thus initiating a test with a planned 3- to 5-year fuel storage phase. The SFT-C operational objective of demonstrating the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner has been met. Three exchanges of spent fuel between the SFT-C and a surface storage facility furthered this demonstration. Technical objectives of the test led to development of a technical measurements program, which is the subject of this and two previous interim reports. Geotechnical, seismological, and test status data have been recorded on a continuing basis for the first 2-1/2 years of the test on more than 900 channels. Data continue to be acquired from the test. Some data are now available for analysis and are presented here. Highlights of activities this year include analysis of fracture data obtained during site characterization, laboratory studies of radiation effects and drilling damage in Climax granite, improved calculations of near-field heat transfer and thermomechanical response, a ventilation effects study, and further development of the data acquisition and management systems.

  12. AMMRC (Army Materials and Mechanics Research Center) mobile-accelerator neutron-radiography system operations at US Army Yuma Proving Ground. Interim technical report

    SciTech Connect

    Dance, W.E.; Carollo, S.F.

    1984-04-15

    The mobile neutron radiography system designed and fabricated for the Army Materials and Mechanics Research Center was transported for exploratory evaluation by YPG radiography personnel. Objectives of the field operations were to demonstrate applicability of neutron radiography for inspection of specific Army ordnance items, to provide Army personnel with on-site experience and a data base for defining future neutron radiography and facility requirements, and to evaluate the reliability of this new type of mobile neutron radiography system in a non-laboratory or field environment. Neutron radiographs were compared with X-ray radiographs of the test items. Areas were noted where only the neutron images yielded useful NDI information, and others noted where X-ray is needed. The complementary nature of the results from the two radiographic techniques was well illustrated. Several neutron converter/film combinations were used during the operations to determine the optimum combination for producing good images in reasonable exposure times, using a relatively low-flux system. The system operated reliably during the six weeks period in the non-laboratory environment, and safety of operation of the mobile inspection unit was demonstrated.

  13. Science Opportunities Enabled by NASA's Constellation System: Interim Report

    NASA Technical Reports Server (NTRS)

    2008-01-01

    on two criteria: whether the concepts offered the potential for a significant scientific advance, and whether or not the concepts would benefit from the Constellation System. The committee determined that all of the concepts offered the possibility of a significant scientific advance, but it cautions that such an evaluation ultimately must be made by the decadal survey process, and it emphasizes that this interim report s evaluation should not be considered to be an endorsement of the scientific merit of these proposals, which must of course be evaluated relative to other proposals. The committee determined that seven of these concepts would benefit from the Constellation System, whereas four would not, but it stresses that this conclusion does not reflect an evaluation of the scientific merit of the projects, but rather an assessment of whether or not new capabilities provided by the Constellation System could significantly affect them. Some of the mission concepts, such as the Advanced Compton Telescope, already offer a significant scientific advance and fit easily within the mass and volume constraints of existing launch vehicles. Other mission concepts, such as the Palmer Quest proposal to drill through the Mars polar cap, are not constrained by the launch vehicle, but rather by other technology limitations. The committee evaluated the mission concepts as presented to it, aware nevertheless that proposing a far larger and more ambitious mission with the same science goals might be possible given the capabilities of the Ares V launch vehicle. (Such proposals can be submitted in response to the committee s request for information to be evaluated in its final report.) See Table S.1 for a summary of the Vision Missions, including their cost estimates, technical maturity, and reasons that they might benefit from the Constellation System. The committee developed several findings and recommendations.

  14. Online Monitoring Technical Basis and Analysis Framework for Emergency Diesel Generators - Interim Report for FY 2013

    SciTech Connect

    Binh T. Pham; Nancy J. Lybeck; Vivek Agarwal

    2012-12-01

    The Light Water Reactor Sustainability program at Idaho National Laboratory is actively conducting research to develop and demonstrate online monitoring capabilities for active components in existing nuclear power plants. Idaho National Laboratory and the Electric Power Research Institute are working jointly to implement a pilot project to apply these capabilities to emergency diesel generators and generator step-up transformers. The Electric Power Research Institute Fleet-Wide Prognostic and Health Management Software Suite will be used to implement monitoring in conjunction with utility partners: Braidwood Generating Station (owned by Exelon Corporation) for emergency diesel generators, and Shearon Harris Nuclear Generating Station (owned by Duke Energy Progress) for generator step-up transformers. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for emergency diesel generators. Emergency diesel generators provide backup power to the nuclear power plant, allowing operation of essential equipment such as pumps in the emergency core coolant system during catastrophic events, including loss of offsite power. Technical experts from Braidwood are assisting Idaho National Laboratory and Electric Power Research Institute in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the Fleet-Wide Prognostic and Health Management Software Suite and tested using data from Braidwood. Parallel research on generator step-up transformers was summarized in an interim report during the fourth quarter of fiscal year 2012.

  15. Spent fuel test - Climax: technical measurements. Interim report, Fiscal Year 1983

    SciTech Connect

    Patrick, W.C.; Butkovich, T.R.; Carlson, R.C.; Durham, W.B.; Ganow, H.C.; Hage, G.L.; Majer, E.L.; Montan, D.N.; Nyholm, R.A.; Rector, N.L.

    1984-02-01

    The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on the Nevada Test Site. The test is being conducted as part of the Nevada Nuclear Waste Storage Investigations. Eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized April-May 1980. The spent-fuel canisters were retrieved and the thermal sources were de-energized in March-April 1983 when test data indicated that test objectives were met during the 3-year storage phase. The SFT-C operational objective of demonstrating the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner has been met. In addition to emplacement and retrieval operations, three exchanges of spent-fuel between the SFT-C and a surface storage facility, conducted during the storage phase, furthered this demonstration. Technical objectives of the test led to development of a technical measurements program, which is the subject of this and three previous interim reports. Geotechnical, seismological, and test status data have been recorded on a continuing basis for the 3-1/2 year duration of the test on more than 900 channels. Data acquisition from the test is now limited to instrumentation calibration and evaluation activities. Data now available for analysis are presented here. Highlights of activities this year include a campaign of in situ stress measurements, mineralogical and petrological studies of pretest core samples, microfracture analyses of laboratory irradiated cores, improved calculations of near-field heat transfer and thermomechanical response during the final months of heating as well as during a six-month cool-down period, metallurgical analyses of selected test components, and further development of the data acquisition and data management systems. 27 references, 68 figures, 10 tables.

  16. Building an Interim Assessment System: A Workbook for School Districts

    ERIC Educational Resources Information Center

    Crane, Eric W.

    2010-01-01

    As someone with a stake in a school district's systems, a person probably does not have all the answers around what is necessary to build an effective interim assessment system. Neither does this workbook. But it is intended to have the right questions. More precisely, this workbook contains the vision, infrastructure, and resource questions…

  17. Dedicated-site, interim storage of high-level nuclear waste as part of the management system

    PubMed Central

    Zen, E-an

    1980-01-01

    Dedicated-site interim storage of high-level reprocessed nuclear waste and of spent fuel rods is proposed as a long-term integral part of the systems approach of the national nuclear waste isolation program. Separation of interim sites for retrievable storage from permanent-disposal repositories should enhance ensurance of the performance of the latter; maintenance of retrievability at separate sites also has many advantages in both safety and possible use of waste as resources. Interim storage sites probably will not be needed beyond about 100 years from now, so the institutional and technical considerations involved in their choice should be much less stringent than those for the selection of permanent sites. Development of interim sites must be concurrent with unabated effort to identify and to develop permanent repositories. PMID:16592904

  18. Dedicated-site, interim storage of high-level nuclear waste as part of the management system.

    PubMed

    Zen, E A

    1980-11-01

    Dedicated-site interim storage of high-level reprocessed nuclear waste and of spent fuel rods is proposed as a long-term integral part of the systems approach of the national nuclear waste isolation program. Separation of interim sites for retrievable storage from permanent-disposal repositories should enhance ensurance of the performance of the latter; maintenance of retrievability at separate sites also has many advantages in both safety and possible use of waste as resources. Interim storage sites probably will not be needed beyond about 100 years from now, so the institutional and technical considerations involved in their choice should be much less stringent than those for the selection of permanent sites. Development of interim sites must be concurrent with unabated effort to identify and to develop permanent repositories. PMID:16592904

  19. FRACTIONAL CRYSTALLIZATION LABORATORY TESTING WITH INTERIM PRETREATMENT SYSTEM FEEDS

    SciTech Connect

    HERTING DL

    2008-09-17

    The fractional crystallization process was developed as a pretreatment method for saltcake waste retrieved from Hanford single-shell tanks (SST). The process separates the retrieved SST waste into a high-level waste stream containing the bulk of the radionuclides and a low-activity waste stream containing the bulk of the nonradioactive sodium salts. The Interim Pretreatment System project shifted the focus on pretreatment planning from SST waste to double-shell tank waste.

  20. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    SciTech Connect

    Vigil-Holterman, Luciana R.

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  1. Information management architecture for an integrated computing environment for the Environmental Restoration Program. Environmental Restoration Program, Volume 3, Interim technical architecture

    SciTech Connect

    Not Available

    1994-09-01

    This third volume of the Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program--the Interim Technical Architecture (TA) (referred to throughout the remainder of this document as the ER TA)--represents a key milestone in establishing a coordinated information management environment in which information initiatives can be pursued with the confidence that redundancy and inconsistencies will be held to a minimum. This architecture is intended to be used as a reference by anyone whose responsibilities include the acquisition or development of information technology for use by the ER Program. The interim ER TA provides technical guidance at three levels. At the highest level, the technical architecture provides an overall computing philosophy or direction. At this level, the guidance does not address specific technologies or products but addresses more general concepts, such as the use of open systems, modular architectures, graphical user interfaces, and architecture-based development. At the next level, the technical architecture provides specific information technology recommendations regarding a wide variety of specific technologies. These technologies include computing hardware, operating systems, communications software, database management software, application development software, and personal productivity software, among others. These recommendations range from the adoption of specific industry or Martin Marietta Energy Systems, Inc. (Energy Systems) standards to the specification of individual products. At the third level, the architecture provides guidance regarding implementation strategies for the recommended technologies that can be applied to individual projects and to the ER Program as a whole.

  2. Cascade Distiller System Performance Testing Interim Results

    NASA Technical Reports Server (NTRS)

    Callahan, Michael R.; Pensinger, Stuart; Sargusingh, Miriam J.

    2014-01-01

    The Cascade Distillation System (CDS) is a rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. Based upon the results of the 2009 distillation comparison test (DCT) and recommendations of the expert panel, the Advanced Exploration Systems (AES) Water Recovery Project (WRP) project advanced the technology by increasing reliability of the system through redesign of bearing assemblies and improved rotor dynamics. In addition, the project improved the CDS power efficiency by optimizing the thermoelectric heat pump (TeHP) and heat exchanger design. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell d International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades as compared to previous system performance. The system was challenged with Solution 1 from the NASA Exploration Life Support (ELS) distillation comparison testing performed in 2009. Solution 1 consisted of a mixed stream containing human-generated urine and humidity condensate. A secondary objective of this testing is to evaluate the performance of the CDS as compared to the state of the art Distillation Assembly (DA) used in the ISS Urine Processor Assembly (UPA). This was done by challenging the system with ISS analog waste streams. This paper details the results of the AES WRP CDS performance testing.

  3. Skylab systems flight performance - An interim report

    NASA Technical Reports Server (NTRS)

    Belew, L. F.

    1973-01-01

    An unmanned Skylab space station was launched on May 14, 1973. The space station was inserted into a near-circular earth orbit of approximately 435 kilometers altitude. Initial difficulties with Skylab are reported together with the steps taken to overcome these difficulties. The first crew made its rendezvous with Skylab on May 25. A Skylab description is given and a systems overview is presented. Skylab attitude requirements are discussed together with details of attitude control, the communications network, scientific investigations, student experiments, earth resources studies, weather studies, solar observations, biomedical investigations, technology investigations, crew mobility and effectiveness investigations, habitability assessments, and a comet observation.

  4. Online Monitoring Technical Basis and Analysis Framework for Large Power Transformers; Interim Report for FY 2012

    SciTech Connect

    Nancy J. Lybeck; Vivek Agarwal; Binh T. Pham; Heather D. Medema; Kirk Fitzgerald

    2012-09-01

    The Light Water Reactor Sustainability program at Idaho National Laboratory (INL) is actively conducting research to develop and demonstrate online monitoring (OLM) capabilities for active components in existing Nuclear Power Plants. A pilot project is currently underway to apply OLM to Generator Step-Up Transformers (GSUs) and Emergency Diesel Generators (EDGs). INL and the Electric Power Research Institute (EPRI) are working jointly to implement the pilot project. The EPRI Fleet-Wide Prognostic and Health Management (FW-PHM) Software Suite will be used to implement monitoring in conjunction with utility partners: the Shearon Harris Nuclear Generating Station (owned by Duke Energy for GSUs, and Braidwood Generating Station (owned by Exelon Corporation) for EDGs. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for GSUs. GSUs are main transformers that are directly connected to generators, stepping up the voltage from the generator output voltage to the highest transmission voltages for supplying electricity to the transmission grid. Technical experts from Shearon Harris are assisting INL and EPRI in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the FW-PHM Software Suite and tested using data from Shearon-Harris. Parallel research on EDGs is being conducted, and will be reported in an interim report during the first quarter of fiscal year 2013.

  5. The Interim : until you achieve an operationally responsive ground system

    NASA Technical Reports Server (NTRS)

    Wendlandt, Bob; Clarke, Kelly; Lei, Jordan; Miyamoto, Charles; Owen-Mankovich, Kyran

    2008-01-01

    Everyone wants to achieve a 'Responsive' Ground Data System (GDS), but that takes time. What do you do in the interim? Our group, called the Integration, Test and Deployment Team (ITD), is a group of responsive engineers whose primary focus is to assist JPL projects to successfully adapt, test, integrate and deploy their ground data system. The team configures and adapts the GDS for a project, so that analysts, engineers and scientist do not need to be experts in the GDS to operate it. The team has developed a human interface to accommodate all types of users. It provides Graphical User Interfaces (GUI's) for those that want GUI's, command line interfaces for those that want control, and selection button interfaces for other users. The cornerstone of a responsive Ground Data System is responsive people. Without individuals who can be aware of a project's changing needs and requirements, how can the GDS become responsive

  6. The Interim: Until You Achieve an Operationally Responsive Ground System

    NASA Technical Reports Server (NTRS)

    Wendlandt, Bob; Clarke, Kelly; Miyamoto, Charles; Lei, Jordan; Owen-Mankovich, Kyran

    2008-01-01

    Everyone wants to achieve a 'Responsive' Ground Data System (GDS), but that takes time. What do you do in the interim? Our group, called the Integration, Test and Deployment Team (ITD), is a group of responsive engineers whose primary focus is to assist JPL projects to successfully adapt, test, integrate and deploy their ground data system. The team configures and adapts the GDS for a project, so that analysts, engineers and scientist do not need to be experts in the GDS to operate it. The team has developed a human interface to accommodate all types of users. It provides Graphical User Interfaces (GUI's) for those that want GUI's, command line interfaces for those that want control, and selection button interfaces for other users. The cornerstone of a responsive Ground Data System is responsive people. Without individuals who can be aware of a project's changing needs and requirements, how can the GDS become responsive?.

  7. Interim test methods and procedures for determining the performance of small photovoltaic systems

    SciTech Connect

    McNutt, P.; Kroposki, B.; Hansen, R.; DeBlasio, R.

    1998-07-01

    This document provides test methods and procedures for determining the performance of small stand-alone and utility-grid connected PV systems. The procedures in this document provide a common approach for evaluating whether a given PV system is suitable to perform the function it was designed and manufactured to accomplish and meet the application load. This test document fills a testing void and provides the catalyst and focus for establishing the technical foundation and bridging the institutional barriers needed to reduce uncertainty that a system`s performance will be what its designers and builders claim. The need for this document was recently made more apparent with the initiation of a PV Global Approval Program (PVGAP) at the international level and is in response to concerns that PV systems being fielded must meet performance standards and that these standards include system-level performance type tests. The title of these test procedures is prefaced with the word interim because experience in using the procedures is needed before a consensus standard is developed and accepted by the PV community through its activities with the IEEE Standards Coordinating Committee 21 (SCC21) and International Electrotechnical Commission Technical Committee 82 (IEC TC82) national and international standards-making bodies. Both entities have initiated projects to develop test standards and will need the technical basis and validation of test procedures such as those presented in this document before a consensus is achieved by the PV community.

  8. Health Resources Priority and Allocations System (HRPAS). Interim final rule.

    PubMed

    2015-07-17

    This interim final rule establishes standards and procedures by which the U.S. Department of Health and Human Services (HHS) may require that certain contracts or orders that promote the national defense be given priority over other contracts or orders. This rule also sets new standards and procedures by which HHS may allocate materials, services, and facilities to promote the national defense. This rule will implement HHS's administration of priorities and allocations actions, and establish the Health Resources Priorities and Allocation System (HRPAS). The HRPAS will cover health resources pursuant to the authority under Section 101(c) of the Defense Production Act as delegated to HHS by Executive Order 13603. Priorities authorities (and other authorities delegated to the Secretary in E.O. 13603, but not covered by this regulation) may be re-delegated by the Secretary. The Secretary retains the authority for allocations. PMID:26189218

  9. Honeywell Cascade Distiller System Performance Testing Interim Results

    NASA Technical Reports Server (NTRS)

    Callahan, Michael R.; Sargusingh, Miriam

    2014-01-01

    The ability to recover and purify water through physiochemical processes is crucial for realizing long-term human space missions, including both planetary habitation and space travel. Because of their robust nature, distillation systems have been actively pursued as one of the technologies for water recovery. The Cascade Distillation System (CDS) is a vacuum rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. The CDS was previously under development through Honeywell and NASA. In 2009, an assessment was performed to collect data to support down-selection and development of a primary distillation technology for application in a lunar outpost water recovery system. Based on the results of this testing, an expert panel concluded that the CDS showed adequate development maturity, TRL-4, together with the best product water quality and competitive weight and power estimates to warrant further development. The Advanced Exploration Systems (AES) Water Recovery Project (WRP) worked to address weaknesses identified by The Panel; namely bearing design and heat pump power efficiency. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades. The CDS will also have been challenged with ISS analog waste streams and a subset of those being considered for Exploration architectures. This paper details interim results of the AES WRP CDS performance testing.

  10. 78 FR 20503 - Energy Conservation Program: Availability of the Interim Technical Support Document for High...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ..., 2013, at 78 FR 13566, is extended. DOE will accept comments, data, and information regarding this... public meeting and availability of the interim analysis in the Federal Register (78 FR 13566) to...

  11. INDEPENDENT TECHNICAL REVIEW OF THE C-400 INTERIM REMEDIAL PROJECT PHASE I RESULTS, PADUCAH, KENTUCKY

    SciTech Connect

    Looney, B.; Rossabi, J.; Stewart,L.; Richards, W.

    2010-10-29

    The groundwater and soil in the vicinity of the C-400 Building at the Paducah Gaseous Diffusion Plant (PGDP), is contaminated with substantial quantities of industrial solvents, primarily trichoroethene (TCE). This solvent 'source' is recognized as a significant challenge and an important remediation target in the overall environmental cleanup strategy for PGDP. Thus, the cleanup of the C-400 TCE Source is a principal focus for the Department of Energy (DOE) and its contractors, and for PGDP regulators and stakeholders. Using a formal investigation, feasibility study and decision process, Electrical Resistance Heating (ERH) was selected for the treatment of the soil and groundwater in the vicinity of C-400. ERH was selected as an interim action to remove 'a significant portion of the contaminant mass of TCE at the C-400 Cleaning Building area through treatment' with the longer term goal of reducing 'the period the TCE concentration in groundwater remains above its Maximum Contaminant Level (MCL).' ERH is a thermal treatment that enhances the removal of TCE and related solvents from soil and groundwater. The heterogeneous conditions at PGDP, particularly the high permeability regional gravel aquifer (RGA), are challenging to ERH. Thus, a phased approach is being followed to implement this relatively expensive and complex remediation technology. Conceptually, the phased approach encourages safety and efficiency by providing a 'lessons learned' process and allowing appropriate adjustments to be identified and implemented prior to follow-on phase(s) of treatment. More specifically, early deployment targeted portions of the challenging RGA treatment zone with relatively little contamination reducing the risk of adverse collateral impacts from underperformance in terms of heating and capture. Because of the importance and scope of the C-400 TCE source remediation activities, DOE chartered an Independent Technical Review (ITR) in 2007 to assess the C-400 ERH plans prior

  12. Interim performance criteria for photovoltaic energy systems. [Glossary included

    SciTech Connect

    DeBlasio, R.; Forman, S.; Hogan, S.; Nuss, G.; Post, H.; Ross, R.; Schafft, H.

    1980-12-01

    This document is a response to the Photovoltaic Research, Development, and Demonstration Act of 1978 (P.L. 95-590) which required the generation of performance criteria for photovoltaic energy systems. Since the document is evolutionary and will be updated, the term interim is used. More than 50 experts in the photovoltaic field have contributed in the writing and review of the 179 performance criteria listed in this document. The performance criteria address characteristics of present-day photovoltaic systems that are of interest to manufacturers, government agencies, purchasers, and all others interested in various aspects of photovoltaic system performance and safety. The performance criteria apply to the system as a whole and to its possible subsystems: array, power conditioning, monitor and control, storage, cabling, and power distribution. They are further categorized according to the following performance attributes: electrical, thermal, mechanical/structural, safety, durability/reliability, installation/operation/maintenance, and building/site. Each criterion contains a statement of expected performance (nonprescriptive), a method of evaluation, and a commentary with further information or justification. Over 50 references for background information are also given. A glossary with definitions relevant to photovoltaic systems and a section on test methods are presented in the appendices. Twenty test methods are included to measure performance characteristics of the subsystem elements. These test methods and other parts of the document will be expanded or revised as future experience and needs dictate.

  13. 1988 Federal Interim Storage Fee study: A technical and economic analysis

    SciTech Connect

    Not Available

    1988-11-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). The information in this report, which was prepared by E.R. Johnson Associates, Inc., under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program. The FIS Program was mandated by the Nuclear Waste Policy Act of 1982. The information will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1989. 13 refs.

  14. 1987 Federal interim storage fee study: A technical and economic analysis

    SciTech Connect

    Not Available

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs.

  15. Flammability, Offgassing, and Compatibility Requirements and Test Procedures. Interim NASA Technical Standard

    NASA Technical Reports Server (NTRS)

    2009-01-01

    This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.

  16. Spent fuel test - Climax: technical measurements. Interim report, fiscal year 1981

    SciTech Connect

    Patrick, W.C.; Ballou, L.B.; Butkovich, T.R.

    1982-04-30

    The Spent Fuel Test-Climax (SFT-C) is located 420 m below surface in the Climax granite stock on the Nevada Test Site. Eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized from April to May 1980, initiating the 3- to 5-year-duration test. The SFT-C operational objective of demonstrating the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner has been met. Technical objectives of the test led to development of a technical measurements program, which is the subject of this report. Geotechnical, seismological, and test status data have been recorded on a continuing basis for the first 1-1/2 years of the test on more than 900 channels. Much of the acquired data are now available for analysis and are presented here. Highlights of activities this year include completion of site characterization field work, major modifications to the data acquisition and the management systems, and the addition of instrument evaluation as an explicit objective of the test.

  17. National Evaluation of the Comprehensive Technical Assistance Centers. Interim Report. NCEE 2010-4033

    ERIC Educational Resources Information Center

    Turnbull, Brenda J.; White, Richard N.; Sinclair, Elizabeth; Riley, Derek; Sipe, Cynthia L.; Pistorino, Carol

    2010-01-01

    This first of two reports presents early findings from the National Evaluation of the Comprehensive Technical Assistance Centers (Comprehensive Centers), a federally funded program that provides technical assistance to states in connection with the No Child Left Behind (NCLB) Act of 2001. The law authorizing the Comprehensive Centers, the…

  18. Advanced Exploration Systems Water Architecture Study Interim Results

    NASA Technical Reports Server (NTRS)

    Sargusingh, Miriam J.

    2013-01-01

    The mission of the Advanced Exploration System (AES) Water Recovery Project (WRP) is to develop advanced water recovery systems that enable NASA human exploration missions beyond low Earth orbit (LEO). The primary objective of the AES WRP is to develop water recovery technologies critical to near-term missions beyond LEO. The secondary objective is to continue to advance mid-readiness-level technologies to support future NASA missions. An effort is being undertaken to establish the architecture for the AES Water Recovery System (WRS) that meets both near- and long-term objectives. The resultant architecture will be used to guide future technical planning, establish a baseline development roadmap for technology infusion, and establish baseline assumptions for integrated ground and on-orbit Environmental Control and Life Support Systems definition. This study is being performed in three phases. Phase I established the scope of the study through definition of the mission requirements and constraints, as well as identifying all possible WRS configurations that meet the mission requirements. Phase II focused on the near-term space exploration objectives by establishing an International Space Station-derived reference schematic for long-duration (>180 day) in-space habitation. Phase III will focus on the long-term space exploration objectives, trading the viable WRS configurations identified in Phase I to identify the ideal exploration WRS. The results of Phases I and II are discussed in this paper.

  19. Interim Principals.

    ERIC Educational Resources Information Center

    Beem, Kate

    2003-01-01

    An interim principal can buy a school district time to land a permanent successor. Also lists where to find an interim principal; the interim's steadying influence; Bob Wallace's wild ride as an interim principal in post-retirement; and Roger Prosise's rationale for turning to an interim appointment. (MLF)

  20. Interim Control Strategy for the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond - Two-year Update

    SciTech Connect

    L. V. Street

    2007-04-01

    The Idaho Cleanup Project has prepared this interim control strategy for the U.S. Department of Energy Idaho Operations Office pursuant to DOE Order 5400.5, Chapter 11.3e (1) to support continued discharges to the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond. In compliance with DOE Order 5400.5, a 2-year review of the Interim Control Strategy document has been completed. This submittal documents the required review of the April 2005 Interim Control Strategy. The Idaho Cleanup Project's recommendation is unchanged from the original recommendation. The Interim Control Strategy evaluates three alternatives: (1) re-route the discharge outlet to an uncontaminated area of the TSF-07; (2) construct a new discharge pond; or (3) no action based on justification for continued use. Evaluation of Alternatives 1 and 2 are based on the estimated cost and implementation timeframe weighed against either alternative's minimal increase in protection of workers, the public, and the environment. Evaluation of Alternative 3, continued use of the TSF-07 Disposal Pond under current effluent controls, is based on an analysis of four points: - Record of Decision controls will protect workers and the public - Risk of increased contamination is low - Discharge water will be eliminated in the foreseeable future - Risk of contamination spread is acceptable. The Idaho Cleanup Project recommends Alternative 3, no action other than continued implementation of existing controls and continued deactivation, decontamination, and dismantlement efforts at the Test Area North/Technical Support Facility.

  1. Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.

    ERIC Educational Resources Information Center

    Bezdek, Roger

    This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…

  2. User Selection of Purchased Information Services. Interim Technical Report (June 1975-January 1976).

    ERIC Educational Resources Information Center

    Hall, Homer J.

    Interviews conducted in the first phase of a project to develop a method for user selection of purchased scientific and technical information services identified a number of relationship among different populations of users. Research scientists, engineers, and patent attorneys want convenient access to original data identified in the search.…

  3. NATIONAL RESPONSE TEAM TECHNICAL ASSISTANCE FOR ANTHRAX RESPONSE. INTERIM FINAL DRAFT. JULY 2005

    EPA Science Inventory

    This document provides technical information on a wide range of activities to aid in response to intentional release of anthrax in urban environments. It includes initial actions when a potential release is discovered, health and safety issues for responders, sampling and analys...

  4. 1986 Federal Interim Storage fee study: a technical and economic analysis

    SciTech Connect

    Not Available

    1986-09-01

    JAI examined alternative methods for structuring charges for federal interim storage (FIS) services and concluded that the combined interests of the Department and the users would be best served, and costs most appropriately recovered, by a two-part fee involving an Initial Payment upon execution of a contract for FIS services followed by a Final Payment upon delivery of the spent fuel to the Department. The Initial Payment would be an advance payment covering the pro rata share of preoperational costs, including (1) the capital costs of the required transfer facilities and storage area, (2) development costs, (3) government administrative costs including storage fund management, (4) impact aid payments made in accordance with Section 136(e) of the Act, and (5) module costs (i.e., storage casks, drywells or silos). The Final Payment would be made at the time of delivery of the spent fuel to the Department and would be calculated to cover the sum of the following: (1) any under- or over-estimation in the costs used to calculate the Initial Payment of the fee (including savings due to rod consolidation), and (2) the total estimated cost of operation and decommissioning of the FIS facilities (including government administrative costs, storage fund management and impact aid). The module costs were included in the Initial Payment to preclude the possible need to obtain appropriations for federal funds to support the purchase of the modules in advance of receipt of the Final Payment. Charges for the transport of spent fuel from the reactor site to FIS facilities would be separately assessed at actual cost since these will be specific to each reactor site and destination.

  5. The hazardous waste management system--Environmental Protection Agency. Interim final amendments to interim final and final rules.

    PubMed

    1982-06-24

    The Resource Conservation and Recovery Act (RCRA) requires that EPA set regulatory standards for all facilities which treat, store, or dispose of hazardous waste. In partial implementation of its requirement, on January 23, 1981, EPA set regulatory standards for incinerators that burn hazardous waste. These regulations were issued as "interim final," which means that, although they were issued in final form, the Agency invited public comment on them with a view to future amendment. Today, EPA is amending, on an interim final basis, certain of its regulations applicable to hazardous waste incineration facilities. Today's amendments include revisions to: the general standards for permitting hazardous waste incinerators (Part 264, Subpart O), published in the Federal Register on January 23, 1981; the interim status standards for hazardous waste incinerators (Part 265, Subpart O), revised on January 23, 1981; and the consolidated permit requirements for incinerators (Part 122), published on May 19, 1980 and January 23, 1981.U PMID:10255871

  6. TADS: Technical Assistance Development System.

    ERIC Educational Resources Information Center

    Epting, Rosemary, Ed.

    Described is the Technical Assistance Development System (TADS), a component of the Frank Porter Graham Child Development Center of the University of North Carolina at Chapel Hill which offers support services to preschool demonstration centers for handicapped children in the First Chance Network. Discussed are the four types of services offered:…

  7. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    SciTech Connect

    Burgard, K.C.

    1998-06-02

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  8. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    SciTech Connect

    Burgard, K.C.

    1998-04-09

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  9. Artificial Intelligence in Training (AIT). Interim Technical Paper for Period February 1991-October 1991.

    ERIC Educational Resources Information Center

    Bloom, Charles P.; And Others

    The objective of the current research program was to develop a prototype knowledge acquisition tool that could enable the investigation of knowledge acquisition issues for instructional systems. Our approach to accomplishing this objective entailed the identification of the types of knowledge to be acquired, the evaluation of methods of acquiring…

  10. Data Management Systems for Structured Information Retrieval. Interim Report.

    ERIC Educational Resources Information Center

    Groner, Leo H.; Goel, Amrit L.

    In this study the advantages and problems involved in using Generalized Data Management Systems (GDMS) to expand the capabilities of information retrieval (IR) systems are investigated. In particular, the design of a Data Manager-1 (DM-1) based system for the Reliability Analysis Center (RAC) at Griffiss AFB, Rome, New York is studied. A design…

  11. Software Verification & Validation Report for the 244-AR Vault Interim Stabilization Ventilation System

    SciTech Connect

    YEH, T.

    2002-11-20

    This document reports on the analysis, testing and conclusions of the software verification and validation for the 244-AR Vault Interim Stabilization ventilation system. Automation control system will use the Allen-Bradley software tools for programming and programmable logic controller (PLC) configuration. The 244-AR Interim Stabilization Ventilation System will be used to control the release of radioactive particles to the environment in the containment tent, located inside the canyon of the 244-AR facility, and to assist the waste stabilization efforts. The HVAC equipment, ducts, instruments, PLC hardware, the ladder logic executable software (documented code), and message display terminal are considered part of the temporary ventilation system. The system consists of a supply air skid, temporary ductwork (to distribute airflow), and two skid-mounted, 500-cfm exhausters connected to the east filter building and the vessel vent system. The Interim Stabilization Ventilation System is a temporary, portable ventilation system consisting of supply side and exhaust side. Air is supplied to the containment tent from an air supply skid. This skid contains a constant speed fan, a pre-filter, an electric heating coil, a cooling coil, and a constant flow device (CFD). The CFD uses a passive component that allows a constant flow of air to pass through the device. Air is drawn out of the containment tent, cells, and tanks by two 500-cfm exhauster skids running in parallel. These skids are equipped with fans, filters, stack, stack monitoring instrumentation, and a PLC for control. The 500CFM exhaust skids were fabricated and tested previously for saltwell pumping activities. The objective of the temporary ventilation system is to maintain a higher pressure to the containment tent, relative to the canyon and cell areas, to prevent contaminants from reaching the containment tent.

  12. Subscriber Response System; El Segundo Interim Test Report.

    ERIC Educational Resources Information Center

    Callais, Richard T.

    A new cable television system, called the Subscriber Response System (SRS), is being tested prior to a trial installation in El Segundo, California. The components include two bidirectional cables, a computer for processing subscribers' requests, and subscriber terminals to be located in homes or offices. The home terminal includes a three-digit…

  13. Fielding The Automated Container Offering System: An interim report

    SciTech Connect

    Dixon, B. ); Rochette, D. ); Crandell, J. )

    1990-01-01

    The Automated Container Offering System (TACOS) is a cargo booking assistant currently being fielded in the International Traffic Directorate of the Military Traffic Management Command (MTMC). The expert system automates the selection process for type and size of SEAVAN containers, ports, carrier, and ship for containerized military cargo moving from the continental US to Europe. It is designed to perform all processing on simple cases and provide assistance to the human booker on complex cases. MTMC processes requests for {approximately}1000 containers per week on these routes. This paper is a case history which describes factors guiding development of TACOS to illustrate several themes which occur in other (military) logistics expert system projects.

  14. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  15. An improved light hydrocarbon analysis system. Interim report

    SciTech Connect

    Lamontagne, R.A.

    1982-05-11

    A system for extracting and measuring ambient levels of C1-C4 hydrocarbons and carbon monoxide (CO) in seawater is described. The analytical instrument is a gas chromatograph with flame ionization detectors that incorporates a catalytic conversion of CO to CH4 (methane). The samples are concentrated prior to introduction to the chromatographic system. The volatile hydrocarbons are extracted from the seawater by the use of a helium flow stream and concentrated on dry ice-acetone cold traps. Air samples can be processed in a similar way.

  16. Environmental surveillance results for 1994 for the Hazelwood Interim Storage Site. FUSRAP technical memorandum Number 140-95-011

    SciTech Connect

    Szojka, S.

    1995-06-01

    This report presents analytical results and an interpretation of the results for samples collected as part of the 1994 environmental surveillance program for the Hazelwood Interim Storage Site (HISS) for the interim storage of radiologically contaminated soils. The discussion provides a comparative analysis of local background conditions and applicable regulatory criteria to results reported for external gamma radiation and for samples from the media investigated (air, surface water, sediment, groundwater, and stormwater). Results from the 1994 environmental surveillance program at HISS indicate that Department of Energy (DOE) guidelines were not exceeded for the calculated airborne particulate dose or for the monitored constituents.

  17. National Aeronautics and Space Administration Exploration Systems Interim Strategy

    NASA Technical Reports Server (NTRS)

    2004-01-01

    Contents include the following: 1. The Exploration Systems Mission Directorate within NASA. Enabling the Vision for Space Exploration. The Role of the Directorate. 2. Strategic Context and Approach. Corporate Focus. Focused, Prioritized Requirements. Spiral Transformation. Management Rigor. 3. Achieving Directorate Objectives. Strategy to Task Process. Capability Development. Research and Technology Development. 4. Beyond the Horizon. Appendices.

  18. Lower Flathead System Fisheries Study, 1986 Interim Report.

    SciTech Connect

    Bradshaw, William H.; DosSantos, Joseph M.; Darling, James M.

    1986-08-01

    We believe our results have clearly shown Kerr hydroelectric operations and operational constraints have negatively affected Flathead River trout and northern pike populations and the aquatic habitat which support them. Even so, it is possible to mitigate many of these impacts and develop a very important fishery. Trout abundance in the lower Flathead averaged only 19 fish per kilometer, the lowest abundance of trout for a river of this size in Montana. Little main channel spawning by trout was observed and most spawning probably occurs in tributaries. Lower river tributaries support resident populations of brook, rainbow, brown, and cutthroat trout; and a small resident population of bull trout is present in the South Fork of the Jocko River. Using weirs, spawning runs of rainbow and brown trout from the main river were monitored entering the Jocko River and the Post/Mission Creek system. Utilization of Crow Creek by main river trout stocks of trout was limited to the 6 km segment below Crow Dam. Evaluations of tributary spawning gravels showed high levels of silt which would suggest poor survival of trout eggs. Excessive harvest in the tributaries was indicated by analysis of age class structure and abundance of trout greater than 200 mm.

  19. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The relationship of the health services provided by the facility to the existing health care system of... purposes of this paragraph, a “person directly affected by the review” is as defined in 42 CFR 122.306 (a... 42 Public Health 1 2010-10-01 2010-10-01 false Interim Procedures and Criteria for Review...

  20. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... The relationship of the health services provided by the facility to the existing health care system of... purposes of this paragraph, a “person directly affected by the review” is as defined in 42 CFR 122.306 (a... 42 Public Health 1 2014-10-01 2014-10-01 false Interim Procedures and Criteria for Review...

  1. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... The relationship of the health services provided by the facility to the existing health care system of... purposes of this paragraph, a “person directly affected by the review” is as defined in 42 CFR 122.306 (a... 42 Public Health 1 2011-10-01 2011-10-01 false Interim Procedures and Criteria for Review...

  2. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... The relationship of the health services provided by the facility to the existing health care system of... purposes of this paragraph, a “person directly affected by the review” is as defined in 42 CFR 122.306 (a... 42 Public Health 1 2012-10-01 2012-10-01 false Interim Procedures and Criteria for Review...

  3. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... The relationship of the health services provided by the facility to the existing health care system of... purposes of this paragraph, a “person directly affected by the review” is as defined in 42 CFR 122.306 (a... 42 Public Health 1 2013-10-01 2013-10-01 false Interim Procedures and Criteria for Review...

  4. 76 FR 63676 - Final Division of Safety Systems Interim Staff Guidance DSS-ISG-2010-01: Staff Guidance Regarding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-13

    ... COMMISSION Final Division of Safety Systems Interim Staff Guidance DSS-ISG- 2010-01: Staff Guidance Regarding the Nuclear Criticality Safety Analysis for Spent Fuel Pools AGENCY: Nuclear Regulatory Commission... Regarding the Nuclear Criticality Safety Analysis for Spent Fuel Pools.'' This DSS-ISG provides...

  5. PROJECT W-551 SUMMARY INFORMATION FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    SciTech Connect

    AR, TEDESCHI

    2008-08-11

    This report provides summary data for use by the decision board to assess and select the final technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-fonnaldebyde resin. This document provides a summary of comparative data against prior weighted criteria to support technology selection. Supporting details and background for this summary are documented in the separate report, RPP-RPT-37741.

  6. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    SciTech Connect

    TEDESCHI AR

    2008-08-11

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

  7. Evaluation of 2004 Toyota Prius Hybrid Electric Drive System Interim Report

    SciTech Connect

    Ayers, C.W.

    2004-11-23

    Laboratory tests were conducted to evaluate the electrical and mechanical performance of the 2004 Toyota Prius and its hybrid electric drive system. As a hybrid vehicle, the 2004 Prius uses both a gasoline-powered internal combustion engine and a battery-powered electric motor as motive power sources. Innovative algorithms for combining these two power sources results in improved fuel efficiency and reduced emissions compared to traditional automobiles. Initial objectives of the laboratory tests were to measure motor and generator back-electromotive force (emf) voltages and determine gearbox-related power losses over a specified range of shaft speeds and lubricating oil temperatures. Follow-on work will involve additional performance testing of the motor, generator, and inverter. Information contained in this interim report summarizes the test results obtained to date, describes preliminary conclusions and findings, and identifies additional areas for further study.

  8. 76 FR 6690 - Highway Systems; Technical Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... CFR 470. In its final rule published in the Federal Register on June 19, 1997, at 62 FR 33355, the... Federal Highway Administration 23 CFR Part 470 RIN 2125-AF35 Highway Systems; Technical Correction.... SUMMARY: This rule makes a technical correction to the regulations that govern the designation of...

  9. Technical Competencies for the Safe Interim Storage and Management of 233U at U.S. Department of Energy Facilities

    SciTech Connect

    Campbell, D.O.; Krichinsky, A.M.; Laughlin, S.S.; Van Essen, D.C.; Yong, L.K.

    1999-02-17

    Uranium-233 (with concomitant {sup 232}U) is a man-made fissile isotope of uranium with unique nuclear characteristics which require high-integrity alpha containment biological shielding, and remote handling. The special handling considerations and the fact that much of the {sup 233}U processing and large-scale handling was performed over a decade ago underscore the importance of identifying the people within the DOE complex who are currently working with or have worked with {sup 233}U. The availability of these key personnel is important in ensuring safe interim storage, management and ultimate disposition of {sup 233}U at DOE facilities. Significant programs are ongoing at several DOE sites with actinides. The properties of these actinide materials require many of the same types of facilities and handling expertise as does {sup 233}U.

  10. Technical considerations related to interim source-term assumptions for emergency planning and equipment qualification. [PWR; BWR

    SciTech Connect

    Niemczyk, S.J.; McDowell-Boyer, L.M.

    1982-09-01

    The source terms recommended in the current regulatory guidance for many considerations of light water reactor (LWR) accidents were developed a number of years ago when understandings of many of the phenomena pertinent to source term estimation were relatively primitive. The purpose of the work presented here was to develop more realistic source term assumptions which could be used for interim regulatory purposes for two specific considerations, namely, equipment qualification and emergency planning. The overall approach taken was to adopt assumptions and models previously proposed for various aspects of source term estimation and to modify those assumptions and models to reflect recently gained insights into, and data describing, the release and transport of radionuclides during and after LWR accidents. To obtain illustrative estimates of the magnitudes of the source terms, the results of previous calculations employing the adopted assumptions and models were utilized and were modified to account for the effects of the recent insights and data.

  11. Technical development for Australia's MOBILESAT system

    NASA Technical Reports Server (NTRS)

    Dinh, Kim; Hart, Nick; Harrison, Steve

    1990-01-01

    With the planned introduction in Australia of the mobile satellite service in mid-1992, MOBILESAT will be the first domestic mobile satellite system with full voice and data capability to be in operation worldwide. This paper describes the technical features which have been adopted by MOBILESAT in providing a unique system optimized for land mobile operation and the technical activities which have been carried out by AUSSAT in the past three years in supporting the development of the system.

  12. An Experimental Seismic Data and Parameter Exchange System for Interim NEAMTWS

    NASA Astrophysics Data System (ADS)

    Hanka, W.; Hoffmann, T.; Weber, B.; Heinloo, A.; Hoffmann, M.; Müller-Wrana, T.; Saul, J.

    2009-04-01

    In 2008 GFZ Potsdam has started to operate its global earthquake monitoring system as an experimental seismic background data centre for the interim NEAMTWS (NE Atlantic and Mediterranean Tsunami Warning System). The SeisComP3 (SC3) software, developed within the GITEWS (German Indian Ocean Tsunami Early Warning System) project was extended to test the export and import of individual processing results within a cluster of SC3 systems. The initiated NEAMTWS SC3 cluster consists presently of the 24/7 seismic services at IMP, IGN, LDG/EMSC and KOERI, whereas INGV and NOA are still pending. The GFZ virtual real-time seismic network (GEOFON Extended Virtual Network - GEVN) was substantially extended by many stations from Western European countries optimizing the station distribution for NEAMTWS purposes. To amend the public seismic network (VEBSN - Virtual European Broadband Seismic Network) some attached centres provided additional private stations for NEAMTWS usage. In parallel to the data collection by Internet the GFZ VSAT hub for the secured data collection of the EuroMED GEOFON and NEAMTWS backbone network stations became operational and the first data links were established. In 2008 the experimental system could already prove its performance since a number of relevant earthquakes have happened in NEAMTWS area. The results are very promising in terms of speed as the automatic alerts (reliable solutions based on a minimum of 25 stations and disseminated by emails and SMS) were issued between 2 1/2 and 4 minutes for Greece and 5 minutes for Iceland. They are also promising in terms of accuracy since epicenter coordinates, depth and magnitude estimates were sufficiently accurate from the very beginning, usually don't differ substantially from the final solutions and provide a good starting point for the operations of the interim NEAMTWS. However, although an automatic seismic system is a good first step, 24/7 manned RTWCs are mandatory for regular manual verification

  13. Core Technical Capability Laboratory Management System

    NASA Technical Reports Server (NTRS)

    Shaykhian, Linda; Dugger, Curtis; Griffin, Laurie

    2008-01-01

    The Core Technical Capability Lab - oratory Management System (CTCLMS) consists of dynamically generated Web pages used to access a database containing detailed CTC lab data with the software hosted on a server that allows users to have remote access.

  14. Curriculum Development System for Navy Technical Training.

    ERIC Educational Resources Information Center

    Butler, Lucius

    Documentation for the U.S. Navy's curriculum development system is brought together in this paper, beginning with a description of the Naval Technical Training System. This description includes the Navy Training Plan (NTP) process, which is the current mechanism for introducing new courses; the organization and administration of the system; the…

  15. Proceedings of the Lake Wilderness Attention Conference. Interim Technical Report, August 1, 1980 through September 30, 1980.

    ERIC Educational Resources Information Center

    Lansman, Marcy, Ed.; Hunt, Earl, Ed.

    This technical report contains papers prepared by the 11 speakers at the 1980 Lake Wilderness (Seattle, Washington) Conference on Attention. The papers are divided into general models, physiological evidence, and visual attention categories. Topics of the papers include the following: (1) willed versus automatic control of behavior; (2) multiple…

  16. Identification and Analysis of Social Incentives in Air Force Technical Training: Period June 1972-August 1975, Interim Report.

    ERIC Educational Resources Information Center

    Wood, Michael T.; And Others

    The report describes the procedures followed in identifying and analyzing social incentives which might be used in Air Force technical training. Questionnaire techniques were used to scale a list of 62 potential incentives for attractiveness, feasibility, and other characteristics. Personal motives, background variables, and ambiguous surface…

  17. Monitoring and Technical Assistance Review System Notebook

    ERIC Educational Resources Information Center

    Administration for Children & Families, 2008

    2008-01-01

    This notebook provides guidance on the Monitoring and Technical Assistance Review System (MTARS). The manual is intended for use by Administration on Developmental Disabilities (ADD) staff who manage MTARS and by MTARS reviewers who conduct site visit activities. The notebook is also designed to help Councils, Protection and Advocacy Systems, and…

  18. Vehicle Systems Analysis Technical Team Roadmap

    SciTech Connect

    2013-06-01

    The mission of the Vehicle Systems Analysis Technical Team (VSATT) is to evaluate the performance and interactions of proposed advanced automotive powertrain components and subsystems, in a vehicle systems context, to inform ongoing research and development activities and maximize the potential for fuel efficiency improvements and emission reduction.

  19. Technical Specifications of the Nihongo Tutorial System.

    ERIC Educational Resources Information Center

    Leung, Kei Wai; Maciejewski, Anthony A.

    The Nihongo tutorial system is an intelligent tutorial system designed to use a computer to assist scientists and engineers in developing reading competence in technical Japanese. It consists of three applications: the Nihongo Tutor, which provides useful information about an article (translation, syntax, pronunciation) to help understand the text…

  20. Interim report spent nuclear fuel retrieval system fuel handling development testing

    SciTech Connect

    Ketner, G.L.; Meeuwsen, P.V.; Potter, J.D.; Smalley, J.T.; Baker, C.P.; Jaquish, W.R.

    1997-06-01

    Fuel handling development testing was performed in support of the Fuel Retrieval System (FRS) Sub-Project at the Hanford Site. The project will retrieve spent nuclear fuel, clean and remove fuel from canisters, repackage fuel into baskets, and load fuel into a multi-canister overpack (MCO) for vacuum drying and interim dry storage. The FRS is required to retrieve basin fuel canisters, clean fuel elements sufficiently of uranium corrosion products (or sludge), empty fuel from canisters, sort debris and scrap from whole elements, and repackage fuel in baskets in preparation for MCO loading. The purpose of fuel handling development testing was to examine the systems ability to accomplish mission activities, optimization of equipment layouts for initial process definition, identification of special needs/tools, verification of required design changes to support performance specification development, and validation of estimated activity times/throughput. The test program was set up to accomplish this purpose through cold development testing using simulated and prototype equipment; cold demonstration testing using vendor expertise and systems; and graphical computer modeling to confirm feasibility and throughput. To test the fuel handling process, a test mockup that represented the process table was fabricated and installed. The test mockup included a Schilling HV series manipulator that was prototypic of the Schilling Hydra manipulator. The process table mockup included the tipping station, sorting area, disassembly and inspection zones, fuel staging areas, and basket loading stations. The test results clearly indicate that the Schilling Hydra arm cannot effectively perform the fuel handling tasks required unless it is attached to some device that can impart vertical translation, azimuth rotation, and X-Y translation. Other test results indicate the importance of camera locations and capabilities, and of the jaw and end effector tool design. 5 refs., 35 figs., 3 tabs.

  1. NHI Component Technical Readiness Evaluation System

    SciTech Connect

    Steven R. Sherman; Dane F. Wilson; Steven J. Pawel

    2007-09-01

    A decision process for evaluating the technical readiness or maturity of components (i.e., heat exchangers, chemical reactors, valves, etc.) for use by the U.S. DOE Nuclear Hydrogen Initiative is described. This system is used by the DOE NHI to assess individual components in relation to their readiness for pilot-scale and larger-scale deployment and to drive the research and development work needed to attain technical maturity. A description of the evaluation system is provided, and examples are given to illustrate how it is used to assist in component R&D decisions.

  2. Arctic & Offshore Technical Data System

    Energy Science and Technology Software Center (ESTSC)

    1990-07-01

    AORIS is a computerized information system to assist the technology and planning community in the development of Arctic oil and gas resources. In general, AORIS is geographically dependent and, where possible, site specific. The main topics are sea ice, geotechnology, oceanography, meteorology, and Arctic engineering, as they relate to such offshore oil and gas activities as exploration, production, storage, and transportation. AORIS consists of a directory component that identifies 85 Arctic energy-related databases and tellsmore » how to access them; a bibliographic/management information system or bibliographic component containing over 8,000 references and abstracts on Arctic energy-related research; and a scientific and engineering information system, or data component, containing over 800 data sets, in both tabular and graphical formats, on sea ice characteristics taken from the bibliographic citations. AORIS also contains much of the so-called grey literature, i.e., data and/or locations of Arctic data collected, but never published. The three components are linked so the user may easily move from one component to another. A generic information system is provided to allow users to create their own information systems. The generic programs have the same query and updating features as AORIS, except that there is no directory component.« less

  3. Interim report

    SciTech Connect

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  4. Technical specification for vacuum systems

    SciTech Connect

    Khaw, J.

    1987-01-01

    The vacuum systems at the Stanford Linear Accelerator Center (SLAC) are primarily of all-metal construction and operate at pressures from 10/sup -5/ to 10/sup -11/ Torr. The primary gas loads during operation result from thermal desorption and beam-induced desorption from the vacuum chamber walls. These desorption rates can be extremely high in the case of hydrocarbons and other contaminants. These specifications place a major emphasis on eliminating contamination sources. The specifications and procedures have been written to insure the cleanliness and vacuum integrity of all SLAC vacuum systems, and to assist personnel involved with SLAC vacuum systems in choosing and designing components that are compatible with existing systems and meet the quality and reliability of SLAC vacuum standards. The specification includes requirements on design, procurement, fabrication, chemical cleaning, clean room practices, welding and brazing, helium leak testing, residual gas analyzer testing, bakeout, venting, and pumpdown. Also appended are specifications regarding acceptable vendors, isopropyl alcohol, bakeable valve cleaning procedure, mechanical engineering safety inspection, notes on synchrotron radiation, and specifications of numerous individual components. (LEW)

  5. Development of interim test methods and procedures for determining the performance of small photovoltaic systems

    SciTech Connect

    McNutt, P.; Kroposki, B.; Hansen, R.; Algra, K.; DeBlasio, R.

    1998-09-01

    The National Renewable Energy Laboratory (NREL) is developing tests and procedures that will determine if the configuration of a small photovoltaic (PV) system is suitable for its intended use, and if the system will perform as specified. An overview of these procedures is presented in this paper. Development of standard test procedures will allow designers, manufacturers, system integrators, users, and independent laboratories to assess the performance of PV systems under outdoor prevailing conditions. An NREL Technical Report detailing the procedures is under way, and the IEEE Standards Coordinating Committee 21 (SCC21) has established a project on this subject. The work will be submitted to the IEEE SCC21 and International Electrotechnical Commission Technical Committee 82 (IEC TC82) for consideration as a consensus standard. Certification bodies such as PowerMark and PV Global Approval Program (PVGAP) may adopt the IEC and IEEE documents when testing systems. Developing standardized test methods and procedures at NREL to evaluate the outdoor performance of PV systems will encourage product quality and promote PV standards development. Standardized tests will assure people that PV systems will perform as specified for their intended applications. As confidence in PV systems increases, the successful commercialization of PV will grow internationally.

  6. 77 FR 34399 - Public Housing Assessment System (PHAS): Capital Fund Interim Scoring Notice; Request for Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    .../ . SUPPLEMENTARY INFORMATION: I. Background The PHAS interim rule, published on February 23, 2011, at 76 FR 10136... Fund Scoring Notice, also published on February 23, 2011, at 76 FR 10053. Under this indicator, PHAs... Housing, Department of Housing and Urban Development, 550 12th Street, SW., Suite 100, Washington,...

  7. Editing Tips for Technical Publications in the Joint Nuclear Weapons Publication System (JNWPS)

    SciTech Connect

    ALLEN, TARA S.

    2002-12-01

    These editing tips contain helpful suggestions to assist writers who are writing, editing, and publishing technical publications in the JNWPS. The suggestions clarify some of the most common writing problems and requirements of two publications used in the JNWPS: ''DOE-DTRA TP 1-1, Joint Nuclear Weapons Publications System Operating Procedures, Specifications, and Standards, and United States Government Printing Office Style Manual''. Topics include requirements for abbreviations, formats for drafts, layouts of illustrations and tables, appropriate wording for interim changes, guidance for creating a list of effective pages, how to insert and delete pages and paragraphs, referencing other technical publications, use of revision bars, requirements for safety precautions, use of hyphens, and how to place warnings, cautions, and notes. Also included are a writer's checklist, samples of draft title pages, and a section of helpful tips for the writers who use the department's desktop publishing software program, Adobe{reg_sign} FrameMaker{reg_sign}.

  8. Medicare Program; Hospital Inpatient Prospective Payment Systems for Acute Care Hospitals and the Long-Term Care Hospital Prospective Payment System and Policy Changes and Fiscal Year 2017 Rates; Quality Reporting Requirements for Specific Providers; Graduate Medical Education; Hospital Notification Procedures Applicable to Beneficiaries Receiving Observation Services; Technical Changes Relating to Costs to Organizations and Medicare Cost Reports; Finalization of Interim Final Rules With Comment Period on LTCH PPS Payments for Severe Wounds, Modifications of Limitations on Redesignation by the Medicare Geographic Classification Review Board, and Extensions of Payments to MDHs and Low-Volume Hospitals. Final rule.

    PubMed

    2016-08-22

    making technical corrections and changes to regulations relating to costs to related organizations and Medicare cost reports; we are providing notice of the closure of three teaching hospitals and the opportunity to apply for available GME resident slots under section 5506 of the Affordable Care Act. We are finalizing the provisions of interim final rules with comment period that relate to a temporary exception for certain wound care discharges from the application of the site neutral payment rate under the LTCH PPS for certain LTCHs; application of two judicial decisions relating to modifications of limitations on redesignation by the Medicare Geographic Classification Review Board; and legislative extensions of the Medicare-dependent, small rural hospital program and changes to the payment adjustment for low-volume hospitals. PMID:27544939

  9. Selected Mechanized Scientific and Technical Information Systems.

    ERIC Educational Resources Information Center

    Ackerman, Lynn, Ed.; And Others

    The publication describes the following thirteen computer-based, operational systems designed primarily for the announcement, storage, retrieval and secondary distribution of scientific and technical reports: Defense Documentation Center; Highway Research Board; National Aeronautics and Space Administration; National Library of Medicine; U.S.…

  10. Business Systems Specialist. Technical Committee Report.

    ERIC Educational Resources Information Center

    Idaho State Dept. of Education, Boise. Div. of Vocational Education.

    This Technical Committee Report prepared by industry representatives in Idaho lists the skills currently necessary for an employee in that state to obtain a job as a business systems specialist, retain a job once hired, and advance in that occupational field. (Task lists are grouped according to duty areas generally used in industry settings, and…

  11. America Needs a Technical Training System.

    ERIC Educational Resources Information Center

    Jones, Roberts T.

    1993-01-01

    A vice president of RJR Nabisco discusses concerns regarding the entire workforce and stresses the need for a system that ensures universal access to technical training for all high school students, upgrade training for current workers, and positive training enhancements for dislocated workers. (JOW)

  12. Evaluation of 2004 Toyota Prius Hybrid Electic Drive System Interim Report - Revised

    SciTech Connect

    Ayers, C.W.; Hsu, J.S.; Marlino, L.D.; Miller, C.W.; Ott, G.W., Jr.; Oland, C.B.; Burress, T.A.

    2007-07-31

    The 2004 Toyota Prius is a hybrid automobile equipped with a gasoline engine and a battery-powered electric motor. Both of these motive power sources are capable of providing mechanical drive power for the vehicle. The engine can deliver a peak power output of 57 kilowatts (kW) at 5000 revolutions per minute (rpm) while the motor can deliver a peak power output of 50 kW at 1300 rpm. Together, this engine-motor combination has a specified peak power output of 82 kW at a vehicle speed of 85 kilometers per hour (km/h). In operation, the 2004 Prius exhibits superior fuel economy compared to conventionally powered automobiles. Laboratory tests were conducted to evaluate the electrical and mechanical performance of the 2004 Toyota Prius and its hybrid electric drive system. As a hybrid vehicle, the 2004 Prius uses both a gasoline-powered internal combustion engine and a battery-powered electric motor as motive power sources. Innovative algorithms for combining these two power sources results in improved fuel efficiency and reduced emissions compared to traditional automobiles. Initial objectives of the laboratory tests were to measure motor and generator back-electromotive force (emf) voltages and determine gearbox-related power losses over a specified range of shaft speeds and lubricating oil temperatures. Follow-on work will involve additional performance testing of the motor, generator, and inverter. Information contained in this interim report summarizes the test results obtained to date, describes preliminary conclusions and findings, and identifies additional areas for further study.

  13. Engineering the System and Technical Integration

    NASA Technical Reports Server (NTRS)

    Blair, J. C.; Ryan, R. S.; Schutzenhofer, L. A.

    2011-01-01

    Approximately 80% of the problems encountered in aerospace systems have been due to a breakdown in technical integration and/or systems engineering. One of the major challenges we face in designing, building, and operating space systems is: how is adequate integration achieved for the systems various functions, parts, and infrastructure? This Contractor Report (CR) deals with part of the problem of how we engineer the total system in order to achieve the best balanced design. We will discuss a key aspect of this question - the principle of Technical Integration and its components, along with management and decision making. The CR will first provide an introduction with a discussion of the Challenges in Space System Design and meeting the challenges. Next is an overview of Engineering the System including Technical Integration. Engineering the System is expanded to include key aspects of the Design Process, Lifecycle Considerations, etc. The basic information and figures used in this CR were presented in a NASA training program for Program and Project Managers Development (PPMD) in classes at Georgia Tech and at Marshall Space Flight Center (MSFC). Many of the principles and illustrations are extracted from the courses we teach for MSFC.

  14. TurboTech Technical Evaluation Automated System

    NASA Technical Reports Server (NTRS)

    Tiffany, Dorothy J.

    2009-01-01

    TurboTech software is a Web-based process that simplifies and semiautomates technical evaluation of NASA proposals for Contracting Officer's Technical Representatives (COTRs). At the time of this reporting, there have been no set standards or systems for training new COTRs in technical evaluations. This new process provides boilerplate text in response to interview style questions. This text is collected into a Microsoft Word document that can then be further edited to conform to specific cases. By providing technical language and a structured format, TurboTech allows the COTRs to concentrate more on the actual evaluation, and less on deciding what language would be most appropriate. Since the actual word choice is one of the more time-consuming parts of a COTRs job, this process should allow for an increase in quantity of proposals evaluated. TurboTech is applicable to composing technical evaluations of contractor proposals, task and delivery orders, change order modifications, requests for proposals, new work modifications, task assignments, as well as any changes to existing contracts.

  15. Caustic-Side Solvent-Extraction Modeling for Hanford Interim Pretreatment System

    SciTech Connect

    Moyer, B.A.; Birdwell, J.F.; Delmau, L. H.; McFarlane, J.

    2008-06-01

    The purpose of this work is to examine the applicability of the Caustic-Side Solvent Extraction (CSSX) process for the removal of cesium from Hanford tank-waste supernatant solutions in support of the Hanford Interim Pretreatment System (IPS). The Hanford waste types are more challenging than those at the Savannah River Site (SRS) in that they contain significantly higher levels of potassium, the chief competing ion in the extraction of cesium. It was confirmed by use of the CSSX model that the higher levels of potassium depress the cesium distribution ratio (DCs), as validated by measurement of DCs values for four of eight specified Hanford waste-simulant compositions. The model predictions were good to an apparent standard error of ±11%. It is concluded from batch distribution experiments, physical-property measurements, equilibrium modeling, flowsheet calculations, and contactor sizing that the CSSX process as currently employed for cesium removal from alkaline salt waste at the SRS is capable of treating similar Hanford tank feeds. For the most challenging waste composition, 41 stages would be required to provide a cesium decontamination factor (DF) of 5000 and a concentration factor (CF) of 5. Commercial contacting equipment with rotor diameters of 10 in. for extraction and 5 in. for stripping should have the capacity to meet throughput requirements, but testing will be required to confirm that the needed efficiency and hydraulic performance are actually obtainable. Markedly improved flowsheet performance was calculated for a new solvent formulation employing the more soluble cesium extractant BEHBCalixC6 used with alternative scrub and strip solutions, respectively 0.1 M NaOH and 10 mM boric acid. The improved system can meet minimum requirements (DF = 5000 and CF = 5) with 17 stages or more ambitious goals (DF = 40,000 and CF = 15) with 19 stages. Potential benefits of further research and development are identified that would lead to reduced costs, greater

  16. Estimated economic impacts on the timber, range, and recreation programs on NFS and BLM public lands from adopting the proposed interim pacfish strategy. Forest Service general technical report

    SciTech Connect

    Bolan, N.A.; Hansen-Murray, C.S.; Haynes, R.W.

    1995-08-01

    Implications of the interim comprehensive strategy for improved Pacific salmon and steelhead habitat management (PACFISH) were estimated for those Bureau of Land Management (BLM) districts and National Forest System (NFS) lands west of the Rocky Mountains that have anadromous fish. The physical impacts and associated mitigation costs from implementing the PACFISH strategy over the next decade in Pacific Northwest, Intermountain, Northern, Pacific Southwest, and Alaska Region National Forest and BLM district recreation, range, and timber programs were analyzed with the actual current output as the base. Economic considerations were added to evaluate any change in the perceived ranking of severity among the impacts. Two cases were considered in the analyses: a derived worst case, where a total reduction of the actual current output of the programs in anadromous fishbearing drainages occurs (giving a minimum value for the programs in those drainages), and a mitigated case where all or part of the loss is mitigated and the cost of doing so is evaluated with two phases, one without economics and the other with it.

  17. Solid waste burial grounds interim safety analysis

    SciTech Connect

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  18. Single-shell tank interim stabilization project plan

    SciTech Connect

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  19. Albany Interim Landfill gas extraction and mobile power system: Using landfill gas to produce electricity. Final report

    SciTech Connect

    1997-06-01

    The Albany Interim Landfill Gas Extraction and Mobile Power System project served three research objectives: (1) determination of the general efficiency and radius of influence of horizontally placed landfill gas extraction conduits; (2) determination of cost and effectiveness of a hydrogen sulfide gas scrubber utilizing Enviro-Scrub{trademark} liquid reagent; and (3) construction and evaluation of a dual-fuel (landfill gas/diesel) 100 kW mobile power station. The horizontal gas extraction system was very successful; overall, gas recovery was high and the practical radius of influence of individual extractors was about 50 feet. The hydrogen sulfide scrubber was effective and its use appears feasible at typical hydrogen sulfide concentrations and gas flows. The dual-fuel mobile power station performed dependably and was able to deliver smooth power output under varying load and landfill gas fuel conditions.

  20. Northeast Artificial Intelligence Consortium annual report, 1986. Volume 8. Part B. Parallel, structural, and optimal techniques in vision. Interim technical report, January-December 1986

    SciTech Connect

    Brown, C.M.

    1988-06-01

    The Northeast Artificial Intelligence Consortium's purpose is to conduct pertinent research in artificial intelligence and to perform activities ancillary to this research. These volumes describe progress that has been made in the second year of the existence of the NAIC on the technical research tasks undertaken at the member universities. The topics covered in general are: versatile expert system for equipment maintenance, distributed AI for communications system control, automatic photo interpretation, time-oriented problem solving, speech understanding systems, knowledge base maintenance, hardware architectures for very large systems, knowledge-based reasoning and planning, and a knowledge acquisition, assistance, and explanation system. This part addresses various aspects of parallel, structural, and optimal techniques in computer vision.

  1. Fast Flux Test Facility interim examination and maintenance cell contaminated sodium recovery system: Remote handling design consideration

    SciTech Connect

    Carteret, B.A.

    1988-11-01

    The Westinghouse Hanford Company is installing a remotely operated Contaminated Sodium Recovery System (CSRS) at the Fast Flux Test Facility (FFTF) located in Richland, Washington. The CSRS will recover activated sodium that accumulates in fuel transfer machines during core component transfer operations. Drip pots from the FFTF fuel handling machines will be delivered to the shielded, argon-inerted Interim Examination and Maintenance (IEM) Cell, a hot cell located in the FFTF containment structure. Installation of the CSRS replaces a previously manual operation that required disposal of radioactive sodium with a completely remote operation that will return sodium to service in the plant. The CSRS will minimize the accumulation of hazardous waste and reduce personnel exposure to radioactive materials. Equipment for the CSRS is currently being fabricated and tested before installation in the IEM Cell. 6 figs.

  2. Guidelines for Abstracting Technical Literature on Instructional System Development.

    ERIC Educational Resources Information Center

    Schumacher, Sanford P.; And Others

    Guidelines are presented for the preparation of abstracts of technical literature on instructional systems development (ISD). Although specifically created for abstracting information during the preparation of a technical data file on ISD, the guidelines are sufficiently general to apply to other areas in which abstracts of technical literature…

  3. Hydrogen energy systems studies. Final technical report

    SciTech Connect

    Ogden, J.M.; Kreutz, T.; Kartha, S.; Iwan, L.

    1996-08-13

    The results of previous studies suggest that the use of hydrogen from natural gas might be an important first step toward a hydrogen economy based on renewables. Because of infrastructure considerations (the difficulty and cost of storing, transmitting and distributing hydrogen), hydrogen produced from natural gas at the end-user`s site could be a key feature in the early development of hydrogen energy systems. In the first chapter of this report, the authors assess the technical and economic prospects for small scale technologies for producing hydrogen from natural gas (steam reformers, autothermal reformers and partial oxidation systems), addressing the following questions: (1) What are the performance, cost and emissions of small scale steam reformer technology now on the market? How does this compare to partial oxidation and autothermal systems? (2) How do the performance and cost of reformer technologies depend on scale? What critical technologies limit cost and performance of small scale hydrogen production systems? What are the prospects for potential cost reductions and performance improvements as these technologies advance? (3) How would reductions in the reformer capital cost impact the delivered cost of hydrogen transportation fuel? In the second chapter of this report the authors estimate the potential demand for hydrogen transportation fuel in Southern California.

  4. THESAURUS OF ERIC DESCRIPTORS (INTERIM) JANUARY 1967.

    ERIC Educational Resources Information Center

    1967

    THE "THESAURUS OF ERIC DESCRIPTORS (INTERIM)" SUPERSEDES, AND REPRESENTS A REFINEMENT OF, THE "THESAURUS OF ERIC DESCRIPTORS." THE INTERIM ISSUE IS A PRELIMINARY ERIC SYSTEM TOOL AND IS NOT TO BE CONSIDERED A COMPLETE REPRESENTATION OF THE FINAL PRODUCT. THIS REFINEMENT IS THE RESULT OF TWO MAJOR PROJECTS--(1) THE INCORPORATION OF SUGGESTIONS…

  5. Behavior of spent nuclear fuel and storage system components in dry interim storage. Revision 1

    SciTech Connect

    Johnson, A.B. Jr.; Gilbert, E.R.; Guenther, R.J.

    1983-02-01

    Irradiated nuclear fuel has been handled under dry conditions since the early days of nuclear reactor operation, and use of dry storage facilities for extended management of irradiated fuel began in 1964. Irradiated fuel is currently being stored dry in four types of facilities: dry wells, vaults, silos, and metal casks. Essentially all types of irradiated nuclear fuel are currently stored under dry conditions. Gas-cooled reactor (GCR) and liquid metal fast breeder reactor (LMFBR) fuels are stored in vaults and dry wells. Certain types of fuel are being stored in licensed dry storage facilities: Magnox fuel in vaults in the United Kingdom; organic-cooled reactor (OCR) fuel (clad with a zirconium alloy) in silos in Canada; and boiling water reactor (BWR) fuel (clad with Zircaloy) in a metal storage cask in Germany. Dry storage demonstrations are under way for Zircaloy-clad fuel from BWRs, pressurized heavy-water reactors (PHWRs), and pressurized water reactors (PWRs) in all four types of dry storage facilities. The demonstrations and related hot cell and laboratory tests are directed toward expanding the data base and establishing a licensing basis for dry storage of water reactor fuel. This report reviews the scope of dry interim storage technology, the performance of fuel and facility materials, the status of programs in several countries to license dry storage of water reactor fuel, and the characteristics of water reactor fuel that relate to dry storage conditions. 110 refs., 22 figs., 28 tabs.

  6. Behavior of spent nuclear fuel and storage system components in dry interim storage.

    SciTech Connect

    Johnson, A.B. Jr.; Gilbert, E.R.; Guenther, R.J.

    1982-08-01

    Irradiated nuclear fuel has been handled under dry conditions since the early days of nuclear reactor operation, and use of dry storage facilities for extended management of irradiated fuel began in 1964. Irradiated fuel is currently being stored dry in four types of facilities: dry wells, vaults, silos, and metal casks. Essentially all types of irradiated nuclear fuel are currently stored under dry conditions. Gas-cooled reactor (GCR) and liquid metal fast breeder reactor (LMFBR) fuels are stored in vaults and dry wells. Certain types of fuel are being stored in licensed dry storage facilities: Magnox fuel in vaults in the United Kingdom and organic-cooled reactor (OCR) fuel in silos in Canada. Dry storage demonstrations are under way for Zircaloy-clad fuel from boiling water reactors BWR's, pressurized heavy-water reactors (PHWRs), and pressurized water reactors (PWRs) in all four types of dry storage facilities. The demonstrations and related hot cell and laboratory tests are directed toward expanding the data base and establishing a licensing basis for dry storage of water reactor fuel. This report reviews the scope of dry interim storage technology, the performance of fuel and facility materials, the status of programs in several countries to license dry storage of water reactor fuel, and the characteristics of water reactor fuel that relate to dry storage conditions.

  7. 75 FR 20817 - Information Systems Technical Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... Bureau of Industry and Security Information Systems Technical Advisory Committee Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on May 5, 2010, 9 a... that affect the level of export controls applicable to information systems equipment and...

  8. 77 FR 64464 - Information Systems Technical Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... Bureau of Industry and Security Information Systems Technical Advisory Committee Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on November 7 and 8... information systems equipment and technology. Wednesday, November 7 Open Session 1. Welcome and...

  9. Energy integrated farm system technical summary report

    SciTech Connect

    Breckenridge, R.P.; Price, D.R.; Sherwood, R.K.; Thompson, W.N.

    1987-03-01

    The Energy Integrated Farm System program was established by the Department of Energy in 1980 in response to the hardship imposed on US farmers by high fuel costs and unreliable fuel supplies. The program investigated the feasibility of integrating energy conservation practices with on-farm energy production to reduce farm energy consumption and make farms more energy self-sufficient. Seven farms located in various geographical regions in the US and Puerto Rico participated in the program. Each of these farms developed an energy integrated farm system project that used a unique combination of energy production and energy conservation methods to supply energy to the farm and reduce the farm's dependence on energy produced from nonrenewable sources such as coal and oil. Methods used at these projects included conservation tillage, solar heating, waste heat recovery, methane digestion, electricity production from biogas, alcohol fuel production, fluidized-bed combustion of crop wastes, and computer-aided conservation irrigation. This report is a summary of the seven technical manuals prepared at the conclusion of the projects. It presents highlights and results, provides an overview of successes and problems, and lists recommendations.

  10. National NIF Diagnostic Program Interim Management Plan

    SciTech Connect

    Warner, B

    2002-04-25

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  11. Comparison of cask and drywell storage concepts for a monitored retrievable storage/interim storage system

    SciTech Connect

    Rasmussen, D.E.

    1982-12-01

    The Department of Energy, through its Richland Operations Office is evaluating the feasibility, timing, and cost of providing a federal capability for storing the spent fuel, high-level wastes, and transuranic wastes that DOE may be obligated by law to manage until permanent waste disposal facilities are available. Three concepts utilizing a monitored retrievable storage/interim storage (MRS/IS) facility have been developed and analyzed. The first concept, co-location with a reprocessing plant, has been developed by staff of Allied General Nuclear Services. the second concept, a stand-alone facility, has been developed by staff of the General Atomic Company. The third concept, co-location with a deep geologic repository, has been developed by the Pacific Northwest Laboratory with the assistance of the Westinghouse Hanford Company and Kaiser Engineers. The objectives of this study are: to develop preconceptual designs for MRS/IS facilities: to examine various issues such as transportation of wastes, licensing of the facilities, and environmental concerns associated with operation of such facilities; and to estimate the life-cycle costs of the facilities when operated in response to a set of scenarios that define the quantities and types of waste requiring storage in specific time periods, generally spanning the years 1989 to 2037. Three scenarios are examined to develop estimates of life-cycle costs for the MRS/IS facilities. In the first scenario, the reprocessing plant is placed in service in 1989 and HLW canisters are stored until a repository is opened in the year 1998. Additional reprocessing plants and repositories are placed in service at intervals as needed to meet the demand. In the second scenario, the reprocessing plants are delayed in starting operations by 10 years, but the repositories open on schedule. In the third scenario, the repositories are delayed 10 years, but the reprocessing plants open on schedule.

  12. Information Transport Systems at IBM's Corporate Technical Institutes.

    ERIC Educational Resources Information Center

    Grubb, Ralph E.; Pryzdial, Edward F.

    1986-01-01

    Describes the facilities and major networks of IBM's Corporate Technical Institute state-of-the-art residential campus at Thornwood, New York. Explains the operations and components of its information transport system and the capabilities of its cabling system. (ML)

  13. Technical Assistance Model for Long Term Systems Change

    ERIC Educational Resources Information Center

    Kahn, Lynne; Hurth, Joicey; Diefendorf, Martha; Kasprzak, Christina; Lucas, Anne; Ringwalt, Sharon

    2009-01-01

    The National Early Childhood Technical Assistance Center (NECTAC) was charged by the U.S. Department of Education's Office of Special Education Programs (OSEP) from 2001-2006 to develop, implement, and evaluate an approach to technical assistance that would result in sustainable systems change in state Early Intervention and Preschool Special…

  14. Secretarial Science Occupational Performance Survey. Interim Report.

    ERIC Educational Resources Information Center

    Borcher, Sidney D.; Joyner, John W.

    Intended for the use of curriculum developers, instructors, and others concerned with planning and conducting vocational and technical education programs, this federally funded interim report presents the results of the task inventory analysis survey conducted by the project staff in the secretarial science occupations. In order to develop a…

  15. Technical and Management Information System (TMIS)

    NASA Technical Reports Server (NTRS)

    Rau, Timothy R.

    1987-01-01

    The TMIS goals developed to support the Space Station Program (SSP) mission requirements are outlined. The TMIS will provide common capabilities to all SSP centers and facilitate the flow of technical and management information throughout the program as well as SSP decision-making processes. A summary is presented of the various TMIS phases.

  16. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... deferred UST systems. (a) No person may install an UST system listed in § 280.10(c) for the purpose of storing regulated substances unless the UST system (whether of single- or double-wall construction): (1) Will prevent releases due to corrosion or structural failure for the operational life of the UST...

  17. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... deferred UST systems. (a) No person may install an UST system listed in § 280.10(c) for the purpose of storing regulated substances unless the UST system (whether of single- or double-wall construction): (1) Will prevent releases due to corrosion or structural failure for the operational life of the UST...

  18. 77 FR 24952 - Staff Technical Conference on Geomagnetic Disturbances to the Bulk-Power System; Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... Energy Regulatory Commission Staff Technical Conference on Geomagnetic Disturbances to the Bulk-Power.... to 4:00 p.m. to discuss issues related to the reliability of the Bulk-Power System as affected by... currents to transformers and other equipment on the Bulk-Power System, as well as, options for...

  19. Proceedings: Computer Science and Data Systems Technical Symposium, volume 1

    NASA Technical Reports Server (NTRS)

    Larsen, Ronald L.; Wallgren, Kenneth

    1985-01-01

    Progress reports and technical updates of programs being performed by NASA centers are covered. Presentations in viewgraph form are included for topics in three categories: computer science, data systems and space station applications.

  20. Proceedings: Computer Science and Data Systems Technical Symposium, volume 2

    NASA Technical Reports Server (NTRS)

    Larsen, Ronald L.; Wallgren, Kenneth

    1985-01-01

    Progress reports and technical updates of programs being performed by NASA centers are covered. Presentations in viewgraph form, along with abstracts, are included for topics in three catagories: computer science, data systems, and space station applications.

  1. NIITEK-NVESD AMDS program and interim field-ready system

    NASA Astrophysics Data System (ADS)

    Hibbard, Mark W.; Etebari, Ali

    2010-04-01

    NIITEK (Non-Intrusive Inspection Technology, Inc) develops and fields vehicle-mounted mine and buried threat detection systems. Since 2003, the NIITEK has developed and tested a remote robot-mounted mine detection system for use in the NVESD AMDS program. This paper will discuss the road map of development since the outset of the program, including transition from a data collection platform towards a militarized field-ready system for immediate use as a remote countermine and buried threat detection solution with real-time autonomous threat classification. The detection system payload has been integrated on both the iRobot Packbot and the Foster-Miller Talon robot. This brief will discuss the requirements for a successful near-term system, the progressive development of the system, our current real-time capabilities, and our planned upgrades for moving into and supporting field testing, evaluation, and ongoing operation.

  2. Interim Human Factors Guidance for Hybrid and Digital I&C System

    SciTech Connect

    J.Naser, G.Morris

    2003-08-15

    OAK- B135 To help nuclear power plant operators and suppliers plan, specify, design and implement the modernization of control rooms and other HSI in a way that takes advantage of digital systems and HSI technologies, reflects practical constraints associated with modernizing existing control rooms and I&C systems, and addresses issues associated with hybrid control room HSI.

  3. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection...

  4. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection...

  5. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection...

  6. Study of Man-Machine Communications Systems for the Handicapped. Interim Report.

    ERIC Educational Resources Information Center

    Kafafian, Haig

    Newly developed communications systems for exceptional children include Cybercom; CYBERTYPE; Cyberplace, a keyless keyboard; Cyberphone, a telephonic communication system for deaf and speech impaired persons; Cyberlamp, a visual display; Cyberview, a fiber optic bundle remote visual display; Cybersem, an interface for the blind, fingerless, and…

  7. An Information Storage and Retrieval System for Biological and Geological Data. Interim Report.

    ERIC Educational Resources Information Center

    Squires, Donald F.

    A project is being conducted to test the feasibility of an information storage and retrieval system for museum specimen data, particularly for natural history museums. A pilot data processing system has been developed, with the specimen records from the national collections of birds, marine crustaceans, and rocks used as sample data. The research…

  8. Primer Control System Cyber Security Framework and Technical Metrics

    SciTech Connect

    Wayne F. Boyer; Miles A. McQueen

    2008-05-01

    The Department of Homeland Security National Cyber Security Division supported development of a control system cyber security framework and a set of technical metrics to aid owner-operators in tracking control systems security. The framework defines seven relevant cyber security dimensions and provides the foundation for thinking about control system security. Based on the developed security framework, a set of ten technical metrics are recommended that allow control systems owner-operators to track improvements or degradations in their individual control systems security posture.

  9. The Intentional Interim

    ERIC Educational Resources Information Center

    Nugent, Patricia A.

    2011-01-01

    The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…

  10. An information management system for a spent nuclear fuel interim storage facility.

    SciTech Connect

    Finch, Robert J.; Chiu, Hsien-Lang; Giles, Todd; Horak, Karl Emanuel; Jow, Hong-Nian

    2010-12-01

    We describe an integrated information management system for an independent spent fuel dry-storage installation (ISFSI) that can provide for (1) secure and authenticated data collection, (2) data analysis, (3) dissemination of information to appropriate stakeholders via a secure network, and (4) increased public confidence and support of the facility licensing and operation through increased transparency. This information management system is part of a collaborative project between Sandia National Laboratories, Taiwan Power Co., and the Fuel Cycle Materials Administration of Taiwan's Atomic Energy Council, which is investigating how to implement this concept.

  11. Evolution of the Nebraska Technical Community College System.

    ERIC Educational Resources Information Center

    Johnston, Thomas S.; Simpson, Mary Margaret

    An overview is provided of the historical development, organizational structure, and programs and services of the Nebraska Technical Community College (TCC) System. First, statutory provisions establishing the TCC system and defining its priorities are cited, explaining that the system was established to create locally governed and supported…

  12. Biofilm formation and control in a simulated spacecraft water system - Interim results

    NASA Technical Reports Server (NTRS)

    Schultz, John R.; Taylor, Robert D.; Flanagan, David T.; Gibbons, Randall E.; Brown, Harlan D.; Sauer, Richard L.

    1989-01-01

    The ability of iodine to control microbial contamination and biofilm formation in spacecraft water distribution systems is studied using two stainless steel water subsystems. One subsystem has an iodine level of 2.5 mg/L maintained by an iodinated ion-exchange resin. The other subsystem has no iodine added. Stainless steel coupons are removed from each system to monitor biofilm formation. Results from the first six months of operation indicate that 2.5 mg/L of iodine has limited the number of viable bacteria that can be recovered from the iodinated subsystem. Epifluorescence microscopy of the coupons taken from this subsystem, however, indicates some evidence of microbial colonization after 15 weeks of operation. Numerous bacteria have been continually removed from both the water samples and the coupons taken from the noniodinated subsystem after only 3 weeks of operation.

  13. A simplified piping support system with seismic limit stops: Interim report

    SciTech Connect

    Leung, J.S.M.; Anderson, P.H.; McLean, J.L.

    1989-07-01

    An innovative method has been developed for providing seismic support to nuclear power plant piping. The method, called the Simplified Pipe Support System (SPSS), is based on the concept of permitting free thermal expansion but limiting seismic displacement through the use of pipe support stops with large clearances (Seismic Stops). The Seismic Stops are simple passive supports and are intended to replace the active snubbers that currently used through the nuclear industry. The development program reported here consisted of establishing a practical analytical method for determining the global nonlinear impact response; characterizing the local impact behavior; evaluating its applicability to current ASME Code criteria; demonstrating the concept through full-scale shake table testing; and lastly; verificating analysis methods by comparison to test data and to analyses of actual piping systems. 19 refs., 43 figs., 28 tabs.

  14. NASA Docking System (NDS) Technical Integration Meeting

    NASA Technical Reports Server (NTRS)

    Lewis, James L.

    2010-01-01

    This slide presentation reviews the NASA Docking System (NDS) as NASA's implementation of the International Docking System Standard (IDSS). The goals of the NDS, is to build on proven technologies previously demonstrated in flight and to advance the state of the art of docking systems by incorporating Low Impact Docking System (LIDS) technology into the NDS. A Hardware Demonstration was included in the meeting, and there was discussion about software, NDS major system interfaces, integration information, schedule, and future upgrades.

  15. Crusader Automated Docking System: Technology support for the Crusader Resupply Team. Interim report, Ammunition Logistics Program

    SciTech Connect

    Kring, C.T.; Varma, V.K.; Jatko, W.B.

    1995-11-01

    The US Army and Team Crusader (United Defense, Lockheed Martin Armament Systems, etc.) are developing the next generation howitzer, the Crusader. The development program includes an advanced, self-propelled liquid propellant howitzer and a companion resupply vehicle. The resupply vehicle is intended to rendezvous with the howitzer near the battlefront and replenish ammunition, fuel, and other material. The Army has recommended that Crusader incorporate new and innovative technologies to improve performance and safety. One conceptual design proposes a robotic resupply boom on the resupply vehicle to upload supplies to the howitzer. The resupply boom would normally be retracted inside the resupply vehicle during transit. When the two vehicles are within range of the resupply boom, the boom would be extended to a receiving port on the howitzer. In order to reduce exposure to small arms fire or nuclear, biological, and chemical hazards, the crew would remain inside the resupply vehicle during the resupply operation. The process of extending the boom and linking with the receiving port is called docking. A boom operator would be designated to maneuver the boom into contact with the receiving port using a mechanical joystick. The docking operation depends greatly upon the skill of the boom operator to manipulate the boom into docking position. Computer simulations at the National Aeronautics and Space Administration have shown that computer-assisted or autonomous docking can improve the ability of the operator to dock safely and quickly. This document describes the present status of the Crusader Autonomous Docking System (CADS) implemented at Oak Ridge National laboratory (ORNL). The purpose of the CADS project is to determine the feasibility and performance limitations of vision systems to satisfy the autonomous docking requirements for Crusader and conduct a demonstration under controlled conditions.

  16. Local-Level Prognostics Health Management Systems Framework for Passive AdvSMR Components. Interim Report

    SciTech Connect

    Ramuhalli, Pradeep; Roy, Surajit; Hirt, Evelyn H.; Pardini, Allan F.; Jones, Anthony M.; Deibler, John E.; Pitman, Stan G.; Tucker, Joseph C.; Prowant, Matthew S.; Suter, Jonathan D.

    2014-09-12

    This report describes research results to date in support of the integration and demonstration of diagnostics technologies for prototypical AdvSMR passive components (to establish condition indices for monitoring) with model-based prognostics methods. The focus of the PHM methodology and algorithm development in this study is at the localized scale. Multiple localized measurements of material condition (using advanced nondestructive measurement methods), along with available measurements of the stressor environment, enhance the performance of localized diagnostics and prognostics of passive AdvSMR components and systems.

  17. PVUSA model technical specification for a turnkey photovoltaic power system

    SciTech Connect

    Dows, R.N.; Gough, E.J.

    1995-11-01

    One of the five objectives of PVUSA is to offer U.S. utilities hands-on experience in designing, procuring, and operating PV systems. The procurement process included the development of a detailed set of technical requirements for a PV system. PVUSA embodied its requirements in a technical specification used as an attachment to its contracts for four utility-scale PV systems in the 200 kW to 500 kW range. The technical specification has also been adapted and used by several utilities. The PVUSA Technical Specification has now been updated and is presented here as a Model Technical Specification (MTS) for utility use. The MTS text is also furnished on a computer disk in Microsoft Word 6.0 so that it may be conveniently adapted by each user. The text includes guidance in the form of comments and by the use of parentheses to indicate where technical information must be developed and inserted. Commercial terms and conditions will reflect the procurement practice of the buyer. The reader is referred to PG&E Report Number 95-3090000. 1, PVUSA Procurement, Acceptance and Rating Practices for Photovoltaic Power Plants (1995) for PVUSA experience and practice. The MTS is regarded by PVUSA as a use-proven document, but needs to be adapted with care and attention to detail.

  18. Fuel-lubricity requirements for diesel-injection systems. Interim report, Sep 90-Feb 91

    SciTech Connect

    Lacey, P.I.; Lestz, S.J.

    1991-02-01

    The U.S. Department of Defense has adopted the single fuel for the battlefield concept. Diesel fuel will be replace by JP-8/Jet A-1, which has both lower lubricity and viscosity. Currently, the tribological requirements of fuel-lubricated components in the injection system are unknown. As a result, no widely approved lubricity test or standard exists. Similar problems are currently faced in commercial applications where low-sulfur/aromatic fuels are being introduced. The present study details the wear mechanisms likely to exist with low lubricity fuels, with particular reference to injection equipment known to be fuel sensitive. The wear mechanism was found to ba a function of contact severity and may not be uniquely defined by a single test. A number of potentially viable lubricity tests is suggested, and fuel/additive components are recommended for wear reduction.

  19. Development of backfill material as an engineered barrier in the waste package system- Interim topical report

    SciTech Connect

    Wheelwright, E.J.; Hodges, F.N.; Bray, L.A.; Westsik, J.H. Jr.; Lester, D.H.; Nakai, T.L.; Spaeth, M.E.; Stula, R.T.

    1981-09-01

    A backfill barrier, emplaced between the containerized waste and the host rock, can both protect the other engineered barriers and act as a primary barrier to the release of radionuclides from the waste package. Attributes that a backfill should provide in order to carry out its required function have been identified. Primary attributes are those that have a direct effect upon the release and transport of radionuclides from the waste package. Supportive attributes do not directly affect radionuclide release but are necessary to support the primary attributes. The primary attributes, in order of importance, are: minimize (retard or exclude) the migration of ground water between the host rock and the waste canister system; retard the migration of selected chemical species (corrosive species and radionuclides) in the ground water; control the Eh and pH of the ground water within the waste-package environment. The supportive attributes are: self-seal any cracks or discontinuities in the backfill or interfacing host geology; retain performance properties at all repository temperatures; retain peformance properties during and after receiving repository levels of gamma radiation; conduct heat from the canister system to the host geology; retain mechanical properties and provide resistance to applied mechanical forces; retain morphological stability and compatibility with structural barriers and with the host geology for required period of time. Screening and selection of candidate backfill materials has resulted in a preliminary list of materials for testing. Primary emphasis has been placed on sodium and calcium bentonites and zeolites used in conjunction with quartz sand or crushed host rock. Preliminary laboratory studies have concentrated on permeability, sorption, swelling pressure, and compaction properties of candidate backfill materials.

  20. Intelligent Mobility Systems: Some Socio-technical Challenges and Opportunities

    NASA Astrophysics Data System (ADS)

    Büscher, Monika; Coulton, Paul; Efstratiou, Christos; Gellersen, Hans; Hemment, Drew; Mehmood, Rashid; Sangiorgi, Daniela

    Analysis of socio-technical challenges and opportunities around contemporary mobilities suggests new interpretations and visions for intelligent transport systems. Multiple forms of intelligence are required (but not easily compatible), transport is too narrow a term, and innovation results in new socio-technical systems. An exploration of cumulative, collective and collaborative aspects of mobility systems, allows us to sketch challenges and opportunities in relation to practices of collaboration, communication and coordination, literacies for creativity, comfort and control, citizenship and (lack of) a sense of crisis, concluding with a discussion of methodological implications.

  1. An Interim Report on NASA's Draft Space Technology Roadmaps

    NASA Technical Reports Server (NTRS)

    2011-01-01

    NASA has developed a set of 14 draft roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist (OCT). Each of these roadmaps focuses on a particular technology area (TA). The roadmaps are intended to foster the development of advanced technologies and concepts that address NASA's needs and contribute to other aerospace and national needs. OCT requested that the National Research Council conduct a study to review the draft roadmaps, gather and assess relevant community input, and make recommendations and suggest priorities to inform NASA's decisions as it finalizes its roadmaps. The statement of task states that "based on the results of the community input and its own deliberations, the steering committee will prepare a brief interim report that addresses high-level issues associated with the roadmaps, such as the advisability of modifying the number or technical focus of the draft NASA roadmaps." This interim report, which does not include formal recommendations, addresses that one element of the study charge. NASA requested this interim report so that it would have the opportunity to make an early start in modifying the draft roadmaps based on feedback from the panels and steering committee. The final report will address all other tasks in the statement of task. In particular, the final report will include a prioritization of technologies, will describe in detail the prioritization process and criteria, and will include specific recommendations on a variety of topics, including many of the topics mentioned in this interim report. In developing both this interim report and the final report to come, the steering committee draws on the work of six study panels organized by technical area, loosely following the organization of the 14 roadmaps, as follows: A Panel 1: Propulsion and Power TA01 Launch Propulsion Systems TA02 In-Space Propulsion Technologies TA03 Space Power and Energy Storage Systems TA13

  2. A Technical Index of Interactive Information Systems. Final Report.

    ERIC Educational Resources Information Center

    Fife, Dennis W.; And Others

    The technical features and operational status of interactive information systems, i.e. those providing a conversational usage mode to a non-programer through a data terminal device, are reviewed. The review is designed to aid information specialists in the state-of-the-art assessments preparatory to a detailed system selection procedure. It…

  3. The Computerized Comprehensibility System. Maintainer's Guide. Technical Report No. 33.

    ERIC Educational Resources Information Center

    Kieras, David E.

    This report is a guide for the maintainer or developer of the computerized comprehensibility system (CCS), a system that uses techniques and results from artificial intelligence and cognitive psychology to critique the comprehensibility of a technical document. The purpose of this report is to allow the qualified programmer to rapidly understand…

  4. A Glimpse into a State Technical College System's POS Pathways

    ERIC Educational Resources Information Center

    Frazier, Stephanie D.; Swygert, N. Maria

    2012-01-01

    The South Carolina Technical College System (SCTCS) has embraced POS, providing students across the state with pathways into careers ranging from nuclear systems technology to health care to industrial technology. The SCTCS has strived, over the last 50 years, to foster a bridge between business and education. The colleges coordinate and…

  5. Theory of Technical Systems--Educational Tool for Engineering

    ERIC Educational Resources Information Center

    Eder, Wolfgang Ernst

    2016-01-01

    Hubka's theory of technical systems (TTS) is briefly outlined. It describes commonalities in all engineering devices, whatever their physical principles of action. This theory is based on a general transformation system (TrfS), which can be used to show engineering in the contexts of society, economics and historic developments. The life cycle of…

  6. Technical background for a demonstration magnetic levitation system

    NASA Technical Reports Server (NTRS)

    Britcher, Colin P.

    1987-01-01

    A preliminary technical assessment of the feasibility of a demonstration Magnetic Levitation system, required to support aerodynamic models with a specified clear air volume around them, is presented. Preliminary calculations of required sizes of electromagnets and power supplies are made, indicating that the system is practical. Other aspects, including model position sensing and controller design, are briefly addressed.

  7. 78. View of radar systems technical publication library, transmitter building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    78. View of radar systems technical publication library, transmitter building no. 102, second floor. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  8. Ideal Based Cyber Security Technical Metrics for Control Systems

    SciTech Connect

    W. F. Boyer; M. A. McQueen

    2007-10-01

    Much of the world's critical infrastructure is at risk from attack through electronic networks connected to control systems. Security metrics are important because they provide the basis for management decisions that affect the protection of the infrastructure. A cyber security technical metric is the security relevant output from an explicit mathematical model that makes use of objective measurements of a technical object. A specific set of technical security metrics are proposed for use by the operators of control systems. Our proposed metrics are based on seven security ideals associated with seven corresponding abstract dimensions of security. We have defined at least one metric for each of the seven ideals. Each metric is a measure of how nearly the associated ideal has been achieved. These seven ideals provide a useful structure for further metrics development. A case study shows how the proposed metrics can be applied to an operational control system.

  9. Physics and technical characteristics of ultrasonic sonar systems

    NASA Astrophysics Data System (ADS)

    Maclsaac, Dan; Hämäläinen, Ari

    2002-01-01

    Over the last 20 years, ultrasonic sonar technology has become more prevalent in teaching introductory mechanics laboratories. Hence, an awareness of the physics, measurement constraints, classroom limitations, and pedagogic practices underlying these systems is beneficial professional knowledge for introductory mechanics instructors. This article describes the physics behind these systems at length, discusses Polaroid system technical constraints and behaviors, and suggests solutions for common problematic classroom situations. Alternate classroom sonar systems and sonar-related curricula materials are also addressed.

  10. Technical Considerations for Advanced Propulsion Systems

    NASA Technical Reports Server (NTRS)

    Houts, Michael G.

    1999-01-01

    This presentation reviews concerns involving advanced propulsion systems. The problems involved with the use of Am-242m, is that it has a high "eta" plus an order of magnitude larger fission cross section than other fissionable materials, and that it is extremely rare. However other americium isotopes are much more common, but extremely effective isotopic separation is required. Deuterium-Tritium fusion is also not attractive for space propulsion applications. Because the pulsed systems cannot breed adequate amounts of tritium and it is difficult and expensive to bring tritium from Earth. The systems that do breed tritium have severely limited performance. However, other fusion processes should still be evaluated. Another problem with advanced propellants is that inefficiencies in converting the total energy generated into propellant energy can lead to tremendous heat rejection requirements. Therefore Many. advanced propulsion concepts benefit greatly from low-mass radiators.

  11. Land Use Systems Model. Technical Report. Preliminary.

    ERIC Educational Resources Information Center

    Austin, W. Burnet

    Since the service requirements of a utility depend on the distribution of population and land use in the service area, the planning for future requirements depends on accurate projections of future distributions. This systems approach model organizes land use data as an aid to facility planning. Included as variables are residential, commercial,…

  12. A Resilient Program technical baseline framework for future space systems

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.; Matsunaga, Sumner S.

    2015-05-01

    Recent Better Buying Power (BBP) initiative for improving DoD's effectiveness in developing complex systems includes "Owning the Technical Baseline" (OTB). This paper presents an innovative approach for the development of a "Resilient Program" Technical Baseline Framework (PTBF). The framework provides a recipe for generating the "Resilient Program2" Technical Baseline (PTB) components using the Integrated Program Management (IPM) approach to integrate Key Program Elements (KPEs)3 with System Engineering (SE) process/tools, acquisition policy/process/tools, Cost and Schedule estimating tools, DOD Architecture Framework (DODAF) process/tools, Open System Architecture (OSA) process/tools, Risk Management process/tools, Critical Chain Program Management (CCPM) process, and Earned Value Management System (EVMS) process/tools. The proposed resilient framework includes a matrix that maps the required tools/processes to technical features of a comprehensive reference U.S. DOD "owned" technical baseline. Resilient PTBF employs a new Open System Approach (OSAP) combining existing OSA4 and NOA (Naval Open Architecture) frameworks, supplemented by additional proposed OA (Open Architecture) principles. The new OSAP being recommended to SMC (Space and Missiles Systems Center) presented in this paper is referred to as SMC-OSAP5. Resilient PTBF and SMC-OSAP conform to U.S. DOD Acquisition System (DAS), Joint Capabilities Integration and Development System (JCIDS), and DODAF processes. The paper also extends Ref. 21 on "Program Resiliency" concept by describing how the new OSAP can be used to align SMC acquisition management with DOD BBP 3.0 and SMC's vison for resilient acquisition and sustainment efforts.

  13. Systems Engineering Technical Authority: A Path to Mission Success

    NASA Technical Reports Server (NTRS)

    Andary, James F.; So, Maria M.; Breindel, Barry

    2008-01-01

    The systems engineering of space missions to study planet Earth has been an important focus of the National Aeronautics and Space Administration (NASA) since its inception. But all space missions are becoming increasingly complex and this fact, reinforced by some major mishaps, has caused NASA to reevaluate their approach to achieving safety and mission success. A new approach ensures that there are adequate checks and balances in place to maximize the probability of safety and mission success. To this end the agency created the concept of Technical Authority which identifies a key individual accountable and responsible for the technical integrity of a flight mission as well as a project-independent reporting path. At the Goddard Space Flight Center (GSFC) this responsibility ultimately begins with the Mission Systems Engineer (MSE) for each satellite mission. This paper discusses the Technical Authority process and then describes some unique steps that are being taken at the GSFC to support these MSEs in meeting their responsibilities.

  14. Space fabrication demonstration system, technical volume

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The automatic beam builder ABB was developed, fabricated, and demonstrated within the established contract cost and schedule constraints. The ABB demonstrated the feasibility of: producing lightweight beams automatically within the required rate of 1 to 5 ft of completed beam per minute and producing structurally sound beams with axial design load of 5538 N based on the Grumman photovoltaic satellite solar power system design reference structure.

  15. Combustion properties of coal-char blends: NO{sub x} emission characteristics. Interim final technical report, September 1, 1992--August 31, 1993

    SciTech Connect

    Rostam-Abadi, M.; Khan, L.; Khan, S.; Smoot, L.D.; Germane, G.J.; Eatough, C.N.

    1993-12-31

    Under pulverized coal combustion conditions, NO{sub x} formed during the release of volatile matter far exceed NO{sub x} formed from combustion of the resulting char. It is believed that interactions of NO{sub x} with char is responsible for the reduced NO{sub x} formation from the combustion of char. The goal of this research is to assess the potential technical and economical benefits of co-firing coal-char blends in pulverized coal boilers to reduce NO{sub x}. The rationale for the proposed research is that the presence of char in the flame during the initial stages of combustion may provide catalytic activity for reduction of NO{sub x} produced from volatile nitrogen. This project is a cooperative effort between the Illinois State Geological Survey (ISGS) and BYU/ACERC. Seven hundred and fifty pounds of three coal-char blends containing 12.5%, 25%, and 50% char and 125 pounds of a coal-activated carbon blend containing 12.5% activated carbon were prepared. The volatile matter contents of the blends ranged from 27.3 to 35.6% (dry basis). Char (16.2 wt% volatile matter) was made from an Illinois No. 6 coal (Peabody Coal Company) in a continuous feed charring oven under mild gasification conditions. Nine combustion tests will be performed with the coal and blends in a 0.5--1.0 MBtu/hr combustor located at BYU. Combustion data will be analyzed to determine the effect of blend type, stoichiometry, and flame temperature on NO{sub x} formation, ignition characteristics, flame stability, and combustion efficiency. A four month no-cost extension has been requested for the project. The results of the combustion tests will be reported in the final technical report in December 1993.

  16. 78 FR 65641 - Midcontinent Independent System Operator, Inc.; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Energy Regulatory Commission Midcontinent Independent System Operator, Inc.; Notice of Technical... Commission (Commission) directed staff to convene a technical conference regarding a proposal by Midcontinent..., subject to the outcome of the technical conference and further Commission order. \\1\\ Midcontinent...

  17. SARSAT 406 MHz system technical evaluation

    NASA Technical Reports Server (NTRS)

    Goudy, P.; King, J.; Kissel, F. J.

    1984-01-01

    The location accuracy, access to spacecraft, uplink margin, and interference problems of the COSPAS-SARSAT system are reviewed. Over 90% of positions are accurate to within 5 km, in local mode, slightly worse in global mode. The random access parameters of SARSAT provide for the location of up to 90 beacons with a uniform distribution in the satellite visibility circle (2600 km radius). The ratio of messages correctly processed on board to messages transmitted to the satellite is 0.8, increasing as number of beacons decreases. Interference, particularly over western Europe and the United States degrades performance, but sources can be located.

  18. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    SciTech Connect

    TORRES, T.D.

    2000-08-24

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life.

  19. Funding California Schools: The Revenue Limit System. Technical Appendices

    ERIC Educational Resources Information Center

    Weston, Margaret

    2010-01-01

    This document presents the technical appendices accompanying the report, "Funding California Schools: The Revenue Limit System." Included are: (1) Revenue Limit Calculation and Decomposition; (2) Data and Methods; and (3) Base Funding Alternative Simulation Results. (Contains 5 tables and 26 footnotes.) [For the main report, "Funding California…

  20. Constraints of Information Systems: Conceptual and Technical Problems.

    ERIC Educational Resources Information Center

    Eidell, Terry L.

    This report discussed the conceptual and technical problems which constrain information systems (acquiring, classifying, storing, searching, retrieving) and shows how these are affected by certain characteristics of educational administration's knowledge base. The following constraints are identified: (1) the eclectic and multi-disciplinary…

  1. Ohio Agricultural Business and Production Systems. Technical Competency Profile (TCP).

    ERIC Educational Resources Information Center

    Ray, Gayl M.; Kershaw, Isaac; Mokma, Arnie

    This document describes the essential competencies from secondary through post-secondary associate degree programs for a career in agricultural business and production systems. Following an introduction, the Ohio College Tech Prep standards and program, and relevant definitions are described. Next are the technical competency profiles for these…

  2. Administrative Salaries and Staffing, Wisconsin Technical College System. A Review.

    ERIC Educational Resources Information Center

    Bezruki, Don; Barkelar, Craig; Swenson, Dean; Varana, David

    This 1998 report from the Wisconsin Technical College System Board (WTCSB) reports on administrative compensation, including salaries and fringe benefits, for fiscal year 1996-97. The districts spent a total of $477 million on staff compensation, which accounted for more than 75% of the district's total operating expenditures. While local revenues…

  3. Experiments on Socio-Technical Systems: The Problem of Control.

    PubMed

    Kroes, Peter

    2016-06-01

    My aim is to question whether the introduction of new technologies in society may be considered to be genuine experiments. I will argue that they are not, at least not in the sense in which the notion of experiment is being used in the natural and social sciences. If the introduction of a new technology in society is interpreted as an experiment, then we are dealing with a notion of experiment that differs in an important respect from the notion of experiment as used in the natural and social sciences. This difference shows itself most prominently when the functioning of the new technological system is not only dependent on technological hardware but also on social 'software', that is, on social institutions such as appropriate laws, and actions of operators of the new technological system. In those cases we are not dealing with 'simply' the introduction of a new technology, but with the introduction of a new socio-technical system. I will argue that if the introduction of a new socio-technical system is considered to be an experiment, then the relation between the experimenter and the system on which the experiment is performed differs significantly from the relation in traditional experiments in the natural and social sciences. In the latter experiments it is assumed that the experimenter is not part of the experimental system and is able to intervene in and control the experimental system from the outside. With regard to the introduction of new socio-technical systems the idea that there is an experimenter outside the socio-technical system who intervenes in and controls that system becomes problematic. From that perspective we are dealing with a different kind of experiment. PMID:25702146

  4. Mirror confinement systems: Final technical report

    SciTech Connect

    Not Available

    1988-08-01

    This report contains: (1) A discussion of azimuthal asymmetrics and fluctuations in RFC-XX-M. Both lead to enhanced radial transport in RFC-XX-M, and presumably most other tandem mirror machines as well; A report on four operating modes of RFC-XX-M which were developed and studied as part of the collaboration. These operating modes were the simple tandem mode, the negative (floating) potential mode, the hot electron mode, and the ECH (electron cyclotron heating) mode; A pulsed rf heated discharge cleaning system which was developed for RFC-XX-M. This method of cleaning proved much more effective than normal glow discharge cleaning, and variations of it are currently in use on the GAMMA-10 tandem mirror and the JIPP TII-U tokamak at the Institute for Plasma Physics at Nagoya; Short descriptions of the diagnostics development and improvement done in conjunction with the work on RFC-XX-M; and a compilation of the work performed at the University of Tsukuba on GAMMA-10. Most of the effort on GAMMA-10 involved diagnostics development and improvement. 16 refs., 42 figs., 1 tab.

  5. Technical analysis of prospective photovoltaic systems in Utah.

    SciTech Connect

    Quiroz, Jimmy Edward; Cameron, Christopher P.

    2012-02-01

    This report explores the technical feasibility of prospective utility-scale photovoltaic system (PV) deployments in Utah. Sandia National Laboratories worked with Rocky Mountain Power (RMP), a division of PacifiCorp operating in Utah, to evaluate prospective 2-megawatt (MW) PV plants in different locations with respect to energy production and possible impact on the RMP system and customers. The study focused on 2-MW{sub AC} nameplate PV systems of different PV technologies and different tracking configurations. Technical feasibility was evaluated at three different potential locations in the RMP distribution system. An advanced distribution simulation tool was used to conduct detailed time-series analysis on each feeder and provide results on the impacts on voltage, demand, voltage regulation equipment operations, and flicker. Annual energy performance was estimated.

  6. A perspective on computer documentation: System developer vs. technical editor

    SciTech Connect

    Carnes, E.T.; Truett, L.F.

    1995-12-31

    Between the computer-knowledgeable {open_quotes}techie{close_quotes} and the technical writer is a chasm created by differences in knowledge bases and skills. Although this gap is widened by misunderstandings and misconceptions of system development roles, it is bridged by mutual need and dual appreciation. Often the editor/writer is {open_quotes}behind{close_quotes} from beginning to end. The writer normally joins the team after the programmers are well into system development and do not want to {open_quotes}waste time{close_quotes} discussing fundamentals. The writer is usually excluded from technical discussions because it is assumed that he/she would not understand anyway. Later in the system development cycle, the writer has no time to polish the documentation before a new version of the software is issued which implies that the documentation must be revised. Nevertheless, the editor/writer`s product is critical for the end-user`s appreciation of the software, a fact which promotes unity to complete the comprehensive package of software and documentation. This paper explores the planks in the bridge that spans the chasm between developers and their fundamental PR agents, the technical editors/writers. This paper defines approaches (e.g., The Circling Theory) and techniques (Bold Thrust!) employed for effective communication -- between software developer and technical writer as well as between the software and the end-user.

  7. San Juanico Hybrid System Technical and Institutional Assessment: Preprint

    SciTech Connect

    Corbus, D.; Newcomb, C.; Yewdall, Z.

    2004-07-01

    San Juanico is a fishing village of approximately 120 homes in the Municipality of Comondu, Baja California. In April, 1999, a hybrid power system was installed in San Juanico to provide 24-hour power, which was not previously available. Before the installation of the hybrid power system, a field study was conducted to characterize the electrical usage and institutional and social framework of San Juanico. One year after the installation of the hybrid power system a''post-electrification'' study was performed to document the changes that had occurred after the installation. In December of 2003, NREL visited the site to conduct a technical assessment of the system.

  8. Measurable Control System Security through Ideal Driven Technical Metrics

    SciTech Connect

    Miles McQueen; Wayne Boyer; Sean McBride; Marie Farrar; Zachary Tudor

    2008-01-01

    The Department of Homeland Security National Cyber Security Division supported development of a small set of security ideals as a framework to establish measurable control systems security. Based on these ideals, a draft set of proposed technical metrics was developed to allow control systems owner-operators to track improvements or degradations in their individual control systems security posture. The technical metrics development effort included review and evaluation of over thirty metrics-related documents. On the bases of complexity, ambiguity, or misleading and distorting effects the metrics identified during the reviews were determined to be weaker than necessary to aid defense against the myriad threats posed by cyber-terrorism to human safety, as well as to economic prosperity. Using the results of our metrics review and the set of security ideals as a starting point for metrics development, we identified thirteen potential technical metrics - with at least one metric supporting each ideal. Two case study applications of the ideals and thirteen metrics to control systems were then performed to establish potential difficulties in applying both the ideals and the metrics. The case studies resulted in no changes to the ideals, and only a few deletions and refinements to the thirteen potential metrics. This led to a final proposed set of ten core technical metrics. To further validate the security ideals, the modifications made to the original thirteen potential metrics, and the final proposed set of ten core metrics, seven separate control systems security assessments performed over the past three years were reviewed for findings and recommended mitigations. These findings and mitigations were then mapped to the security ideals and metrics to assess gaps in their coverage. The mappings indicated that there are no gaps in the security ideals and that the ten core technical metrics provide significant coverage of standard security issues with 87% coverage. Based

  9. Technical Letter Report Assessment of Ultrasonic Phased Array Testing for Cast Austenitic Stainless Steel Pressurizer Surge Line Piping Welds and Thick Section Primary System Cast Piping Welds JCN N6398, Task 2A

    SciTech Connect

    Diaz, Aaron A.; Denslow, Kayte M.; Cinson, Anthony D.; Morra, Marino; Crawford, Susan L.; Prowant, Matthew S.; Cumblidge, Stephen E.; Anderson, Michael T.

    2008-07-21

    Research is being conducted for the NRC at PNNL to assess the effectiveness and reliability of advanced NDE methods for the inspection of LWR components. The scope of this research encompasses primary system pressure boundary materials including cast austenitic stainless steels (CASS), dissimilar metal welds (DMWs), piping with corrosion-resistant cladding, weld overlays, and far-side examinations of austenitic piping welds. A primary objective of this work is to evaluate various NDE methods to assess their ability to detect, localize, and size cracks in coarse-grained steel components. This interim technical letter report (TLR) provides a synopsis of recent investigations at PNNL aimed at evaluating the capabilities of phased-array (PA) ultrasonic testing (UT) methods as applied to the inspection of CASS welds in nuclear reactor piping. A description of progress, recent developments and interim results are provided.

  10. 75 FR 12217 - Notice of Availability for Comments Regarding the Planned Environmental Assessment Interim Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... Environmental Assessment Interim Report IIIa Fish Deterrent Barriers, Illinois and Chicago Area Waterways AGENCY... Chicago Sanitary and Ship Canal Dispersal Barriers System. The study is structured as a series of interim reports. Interim Report IIIa, limited to the impacts of implementing additional in- stream...

  11. Advancing socio-technical systems thinking: a call for bravery.

    PubMed

    Davis, Matthew C; Challenger, Rose; Jayewardene, Dharshana N W; Clegg, Chris W

    2014-03-01

    Socio-technical systems thinking has predominantly been applied to the domains of new technology and work design over the past 60 years. Whilst it has made an impact, we argue that we need to be braver, encouraging the approach to evolve and extend its reach. In particular, we need to: extend our conceptualization of what constitutes a system; apply our thinking to a much wider range of complex problems and global challenges; and engage in more predictive work. To illustrate our agenda in novel domains, we provide examples of socio-technical perspectives on the management of crowd events and environmental sustainability. We also outline a research and development agenda to take the area forward. PMID:23664481

  12. 12 CFR 268.505 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Interim relief. 268.505 Section 268.505 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM RULES..., eligibility for a within-grade increase, or the completion of the service requirement for career tenure,...

  13. Solar heating and cooling technical data and systems analysis

    NASA Technical Reports Server (NTRS)

    Christensen, D. L.

    1976-01-01

    The acquisition and processing of selected parametric data for inclusion in a computerized Data Base using the Marshall Information Retrieval and Data System (MIRADS) developed by NASA-MSFC is discussed. This data base provides extensive technical and socioeconomic information related to solar energy heating and cooling on a national scale. A broadly based research approach was used to assist in the support of program management and the application of a cost-effective program for solar energy development and demonstration.

  14. Joint Technical Architecture for Robotic Systems (JTARS)-Final Report

    NASA Technical Reports Server (NTRS)

    Bradley, Arthur T.; Holloway, Sidney E., III

    2006-01-01

    This document represents the final report for the Joint Technical Architecture for Robotic Systems (JTARS) project, funded by the Office of Exploration as part of the Intramural Call for Proposals of 2005. The project was prematurely terminated, without review, as part of an agency-wide realignment towards the development of a Crew Exploration Vehicle (CEV) and meeting the near-term goals of lunar exploration.

  15. Space shuttle SRM interim contract, part 1

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Essential studies and analyses required to integrate the SRM into the booster and overall space shuttle system. Emphasis was placed on the case, nozzle, insulation, and propellant components with resulting performance, weight, and structural load characteristics being generated. Effort conducted during the time period of this contract included studies, analyses, planning, and preliminary design activities. Technical requirements identified in the SRM Project Request for Proposal No. 8-1-4-94-98401 and Thiokol's proposed SRM design (designated Configuration 0) established the basis for this effort. The requirements were evaluated jointly with MSFC and altered where necessary to incorporate new information that evolved after issuance of the RFP and during the course of this interim contract. Revised water impact loads and load distributions were provided based on additional model test data and analytical effort conducted by NASA subsequent to the RFP release. Launch pad peaking loads into the SRM aft skirt were provided which also represented a change from RFP requirements. A modified SRM/External Tank (ET) attachment configuration with new structural load data was supplied by NASA, and direction was received to include a 2 percent inert weight contingency.

  16. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall...

  17. Interim Budget Plan.

    ERIC Educational Resources Information Center

    Office of Student Financial Assistance (ED), Washington, DC.

    This report provides the interim budget plan of the U.S. Department of Education's Office of Student Financial Assistance (OSFA) for fiscal year 2000. It reviews factors influencing OSFA's budget request, including legislative requirements, recent accomplishments, the need to maintain both the Direct Loan and Federal Family Education Loan…

  18. Technical and economic aspects of the Intelsat system

    NASA Astrophysics Data System (ADS)

    Jefferis, A. K.

    1992-03-01

    The paper gives some background on the Intelsat system and explains the financial principles of the organization, which operates as a cost sharing cooperative. The members contribute both capital and operating costs in accordance with their use. The determination of the measure of 'use' in such a complex system requires a careful analysis of the factors which cause the cost. Most of these are technical, based on the use of satellite power, bandwidth and similar factors. Others reflect service related features such as priority, long-term commitment and market elasticity. This last element is only taken into account after ensuring that every service fully contributes the marginal cost of providing it.

  19. Evaluation of a tritium runway-lighting system. Technical note

    SciTech Connect

    Katz, E.S.

    1992-04-01

    A tritium powered runway lighting system was installed and evaluated at the Federal Aviation Administration (FAA) Technical Center. The purpose of this evaluation was to determine if the tritium runway lighting system would safely support Federal Aviation Regulations (FAR) Part 135 commercial operations, during nighttime visual flight rules (VFR) conditions at remote airports. Subject pilots having flight experience levels appropriate for pilots conducting FAR Part 135 air taxi operations were afforded the opportunity of flight testing the system. Results of the evaluation indicate that the tritium runway lighting system does not meet all of the minimum criteria necessary for FAA approval and, therefore, would not guarantee an acceptable level of safety. Tritium Runway Lighting System, Remote Airports.

  20. Applied Space Systems Engineering. Chapter 17; Manage Technical Data

    NASA Technical Reports Server (NTRS)

    Kent, Peter

    2008-01-01

    Effective space systems engineering (SSE) is conducted in a fully electronic manner. Competitive hardware, software, and system designs are created in a totally digital environment that enables rapid product design and manufacturing cycles, as well as a multitude of techniques such as modeling, simulation, and lean manufacturing that significantly reduce the lifecycle cost of systems. Because the SSE lifecycle depends on the digital environment, managing the enormous volumes of technical data needed to describe, build, deploy, and operate systems is a critical factor in the success of a project. This chapter presents the key aspects of Technical Data Management (TDM) within the SSE process. It is written from the perspective of the System Engineer tasked with establishing the TDM process and infrastructure for a major project. Additional perspectives are reflected from the point of view of the engineers on the project who work within the digital engineering environment established by the TDM toolset and infrastructure, and from the point of view of the contactors who interface via the TDM infrastructure. Table 17.1 lists the TDM process as it relates to SSE.

  1. 77 FR 1666 - Information Systems, Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... Bureau of Industry and Security Information Systems, Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on January 25 and... technical questions that affect the level of export controls applicable to information systems equipment...

  2. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Interim goals. 385.38 Section 385.38 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN Ensuring Protection of the Natural System and Water...

  3. Solar thermal power systems. Annual technical progress report, FY 1979

    SciTech Connect

    Braun, Gerald W.

    1980-06-01

    The Solar Thermal Power Systems Program is the key element in the national effort to establish solar thermal conversion technologies within the major sectors of the national energy market. It provides for the development of concentrating mirror/lens heat collection and conversion technologies for both central and dispersed receiver applications to produce electricity, provide heat at its point of use in industrial processes, provide heat and electricity in combination for industrial, commercial, and residential needs, and ultimately, drive processes for production of liquid and gaseous fuels. This report is the second Annual Technical Progress Report for the Solar Thermal Power Systems Program and is structured according to the organization of the Solar Thermal Power Systems Program on September 30, 1979. Emphasis is on the technical progress of the projects rather than on activities and individual contractor efforts. Each project description indicates its place in the Solar Thermal Power Systems Program, a brief history, the significant achievements and real progress during FY 1979, also future project activities as well as anticipated significant achievements are forecast. (WHK)

  4. Technical and economic models of a DBS system for Canada

    NASA Astrophysics Data System (ADS)

    Roscoe, O. S.

    A comprehensive, multidisciplinary study program to develop information regarding the possible implementation of a direct broadcasting satellite system for Canada was completed in 1983. The program included market studies and technical and economic modeling of alternative DBS systems. Both 50 dBW and 54 dBW edge-of-coverage EIRP systems were modeled, with both 4 and 6 beam coverage. It is estimated that an eight to ten channel system for Canada would cost between $400 million and $650 million (1982 Canadian dollars). The main requirement for DBS television service is in rural Canada. Market forecasts are that up to 2-1/2 million households would purchase DBS home receivers. Allowing for a real rate of return of 6 percent, the monthly cost per household for delivery of all channels would range from $5 to $7.

  5. Single-shell tank interim stabilization project plan

    SciTech Connect

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  6. CMM Interim Check (U)

    SciTech Connect

    Montano, Joshua Daniel

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  7. 78 FR 1198 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on January 23 and... on technical questions that affect the level of export controls applicable to information...

  8. Tribal child welfare. Interim final rule.

    PubMed

    2012-01-01

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program. PMID:22242232

  9. Extending systems ergonomics thinking to accommodate the socio-technical issues of Systems of Systems.

    PubMed

    Siemieniuch, C E; Sinclair, M A

    2014-01-01

    Socio-technical issues for Systems of Systems (SoS) differ in several ways from those for systems, mainly because the individual systems that are components of the SoS are usually owned by different organisations, each responsible for the optimisation and operation of its own system. Consequently, management of the SoS is about negotiation and management of the interfaces. Because of issues of Intellectual Property Rights (IPRs), commercial confidence, and the like, there is seldom sufficient, timely information in circulation about the SoS. Surprises are endemic to SoS, and resilience is a fundamental requirement. This paper outlines the different characteristics of SoS compared to ordinary systems, discusses many of the socio-technical issues involved, and then outlines a generic approach to these issues, treating the SoS as a 'wicked problem'. Endemic to this is the need for governance, which is discussed briefly. This is followed by a description of the evident gaps in knowledge about the functioning of SoS, and a listing of tool classes, the development of which would enable progress to be made more effectively. Finally, the paper discusses how the SoS approach might be the best way to entrain ICT to address global drivers, thus pointing to the importance of the SoS approach. PMID:24011651

  10. Active Rack Isolation System Program and Technical Status

    NASA Technical Reports Server (NTRS)

    Bushnell, Glenn; Fialho, Ian; Allen, James; Quraishi, Naveed

    2000-01-01

    The Boeing Active Rack Isolation System (ARIS) is one of the means used to isolate acceleration-sensitive scientific experiments from structurally transmitted disturbances aboard the International Space Station. The presentation provides an overview of ARIS and technical issues associated with the development of the active control system. An overview of ARIS analytical models is presented along with recent isolation performance predictions made using these models. Issues associated with commanding and capturing ARIS data are discussed and possible future options based on the ARIS ISS Characterization Experiment (ICE) Payload On-orbit Processor (POP) are outlined. An overview of the ARIS-ICE experiment scheduled to fly on ISS Flight 6A is presented. The presentation concludes with a discussion of recent- developmental work that includes passive rack damping, umbilical redesigns and advanced multivariable control design methods.

  11. MISSE in the Materials and Processes Technical Information System (MAPTIS )

    NASA Technical Reports Server (NTRS)

    Burns, DeWitt; Finckenor, Miria; Henrie, Ben

    2013-01-01

    Materials International Space Station Experiment (MISSE) data is now being collected and distributed through the Materials and Processes Technical Information System (MAPTIS) at Marshall Space Flight Center in Huntsville, Alabama. MISSE data has been instrumental in many programs and continues to be an important source of data for the space community. To facilitate great access to the MISSE data the International Space Station (ISS) program office and MAPTIS are working to gather this data into a central location. The MISSE database contains information about materials, samples, and flights along with pictures, pdfs, excel files, word documents, and other files types. Major capabilities of the system are: access control, browsing, searching, reports, and record comparison. The search capabilities will search within any searchable files so even if the desired meta-data has not been associated data can still be retrieved. Other functionality will continue to be added to the MISSE database as the Athena Platform is expanded

  12. Disposal facility data for the interim performance

    SciTech Connect

    Eiholzer, C.R.

    1995-05-15

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 {times} 2 {times} 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs.

  13. Technical assessment of maglev system concepts. Final report

    SciTech Connect

    Lever, J.H.

    1998-10-01

    The Government Maglev System Assessment Team operated from 1991 to 1993 as part of the National Maglev Initiative. They assessed the technical viability of four US Maglev system concepts, using the French TGV high speed train and the German TR07 Maglev system as assessment baselines. Maglev in general offers advantages that include high speed potential, excellent system control, high capacity, low energy consumption, low maintenance, modest land requirements, low operating costs, and ability to meet a variety of transportation missions. Further, the US Maglev concepts could provide superior performance to TR07 for similar cost or similar performance for less cost. They also could achieve both lower trip times and lower energy consumption along typical US routes. These advantages result generally from the use of large gap magnetic suspensions, more powerful linear synchronous motors and tilting vehicles. Innovative concepts for motors, guideways, suspension, and superconducting magnets all contribute to a potential for superior long term performance of US Maglev systems compared with TGV and TR07.

  14. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Technical Requirements for Class B Automatic Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES General Technical Standards § 80.231 Technical...

  15. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Technical Requirements for Class B Automatic... (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES General Technical Standards § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a)...

  16. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Technical Requirements for Class B Automatic... (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES General Technical Standards § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a)...

  17. Interim storage study report

    SciTech Connect

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  18. Use of chlorofluorocarbon-based refrigerants in US Army facility air-conditioning and refrigeration systems: Recommendations for the interim period 1994-2000. Final report

    SciTech Connect

    Sohn, C.W.; Homan, K.O.; Herring, N.

    1994-11-01

    Production of chlorofluorocarbons (CFCs) and hydrochlorofluorocarbons (HCFCs) has been scheduled for phaseout because of the contribution of these chemicals to the depletion of the stratospheric ozone layer. CFC production is scheduled for phaseout by I January 1996; HCFC production will halt by the year 2020. The next generation of refrigerants is expected to be tested and widely available by the turn of the century. As a large-scale end user of CFC-based refrigerants, the U.S. Army is faced with a significant challenge by the phaseout of these chemicals. This report makes recommendations for refrigerant use in U.S. Army facility air-conditioning and refrigeration applications for the interim period from the present to the year 2000. Only equipment using CFC refrigerants is addressed since the lifetime of equipment using HCFCs will expire before HCFC refrigerants are phased out. Available options to run as-is, convert, or replace CFC-based machines should be examined in cooperation with reputable contractors representing the original equipment manufacturers (OEMs). Only refrigerants approved by the U.S. Environmental Protection Agency (USEPA) should be considered for use in retrofitted or replaced equipment. As a part of the equipment evaluation, opportunities to improve system efficiency and reliability should also be sought.

  19. Use of chlorofluorocarbon-based refrigerants in USArmy facility air-conditioning and refrigeration systems: Recommendations for the interim period 1994-2000

    NASA Astrophysics Data System (ADS)

    Sohn, Chang W.; Homan, Kelly O.; Herring, Nancy

    1994-11-01

    Production of chlorofluorocarbons (CFC's) and hydrochlorofluorocarbons (HCFC's) has been scheduled for phaseout because of the contribution of these chemicals to the depletion of the stratospheric ozone layer. CFC production is scheduled for phaseout by January 1, 1996; HCFC production will halt by the year 2020. The next generation of refrigerants is expected to be tested and widely available by the turn of the century. As a large-scale end user of CFC-based refrigerants, the U.S. Army is faced with a significant challenge by the phaseout of these chemicals. This report makes recommendations for refrigerant use in U.S. Army facility air-conditioning and refrigeration applications for the interim period from the present to the year 2000. Only equipment using CFC refrigerants is addressed since the lifetime of equipment using CFC's will expire before HCFC refrigerants are phased out. Available options to run as-is, convert, or replace CFC-based machines should be examined in cooperation with reputable contractors representing the original equipment manufacturers (OEM's). Only refrigerants approved by the U.S. Environmental Protection Agency (USEPA) should be considered for use in retrofitted or replaced equipment. As a part of the equipment evaluation, opportunities to improve system efficiency and reliability should also be sought.

  20. Single-shell tank systems technical support program plan

    SciTech Connect

    Klem, M.J.; Golberg, C.E.; Gibby, R.D.; Giese, K.A.; Ruck, F.A.; Sonnichsen, J.C.; Wanner, D.D.; Wing, N.R.; Woodworth, K.A. ); Fletcher, J.F. )

    1990-06-01

    This Single-Shell Tank Systems Technical Support Program Plan (TSPP) provides documentation of the required technology, resources, equipment, program funding, and plans for closure of the six single-shell tank (SST) operable units (OU). The SST OUs comprise treatment, storage, and disposal units (wastes, tanks, and soil contaminated by leaks) and past practice units (ancillary units and soil contaminated by spills). A systems engineering approach is being used as a management tool to assist in reaching a final disposal decision for the SST OUs. The systems approach is a structured process to define and solve a problem. It is useful for large programs that involve multiple scientific and engineering disciplines and span long time periods. The systems approach ensures that development activities are conducted in an integrated, efficient, thorough, logical, defensible, auditable, and verifiable manner. It will allow the US Department of Energy to meet Hanford Federal Facility Agreement and Consent Order milestones and develop the technology required for the supplemental environmental impact statement for SST waste. 19 refs., 41 figs., 46 tabs.

  1. Development of an AC Module System: Final Technical Report

    SciTech Connect

    Suparna Kadam; Miles Russell

    2012-06-15

    The GreenRay Inc. program focused on simplifying solar electricity and making it affordable and accessible to the mainstream population. This was accomplished by integrating a solar module, micro-inverter, mounting and monitoring into a reliable, 'plug and play' AC system for residential rooftops, offering the following advantages: (1) Reduced Cost: Reduction in installation labor with fewer components, faster mounting, faster wiring. (2) Maximized Energy Production: Each AC Module operates at its maximum, reducing overall losses from shading, mismatch, or module downtime. (3) Increased Safety. Electrical and fire safety experts agree that AC Modules have significant benefits, with no energized wiring or live connections during installation, maintenance or emergency conditions. (4) Simplified PV for a Broader Group of Installers. Dramatic simplification of design and installation of a solar power system, enabling faster and more efficient delivery of the product into the market through well-established, mainstream channels. This makes solar more accessible to the public. (5) Broadened the Rooftop Market: AC Modules enable solar for many homes that have shading, split roofs, or obstructions. In addition, due to the smaller building block size of 200W vs. 1000W, homeowners with budget limitations can start small and add to their systems over time. Through this DOE program GreenRay developed the all-in-one AC Module system with an integrated PV Module and microinverter, custom residential mounting and performance monitoring. Development efforts took the product from its initial concept, through prototypes, to a commercial product sold and deployed in the residential market. This pilot deployment has demonstrated the technical effectiveness of the AC Module system in meeting the needs and solving the problems of the residential market. While more expensive than the traditional central inverter systems at the pilot scale, the economics of AC Modules become more and more

  2. Materials And Processes Technical Information System (MAPTIS) LDEF materials database

    NASA Technical Reports Server (NTRS)

    Davis, John M.; Strickland, John W.

    1992-01-01

    The Materials and Processes Technical Information System (MAPTIS) is a collection of materials data which was computerized and is available to engineers in the aerospace community involved in the design and development of spacecraft and related hardware. Consisting of various database segments, MAPTIS provides the user with information such as material properties, test data derived from tests specifically conducted for qualification of materials for use in space, verification and control, project management, material information, and various administrative requirements. A recent addition to the project management segment consists of materials data derived from the LDEF flight. This tremendous quantity of data consists of both pre-flight and post-flight data in such diverse areas as optical/thermal, mechanical and electrical properties, atomic concentration surface analysis data, as well as general data such as sample placement on the satellite, A-O flux, equivalent sun hours, etc. Each data point is referenced to the primary investigator(s) and the published paper from which the data was taken. The MAPTIS system is envisioned to become the central location for all LDEF materials data. This paper consists of multiple parts, comprising a general overview of the MAPTIS System and the types of data contained within, and the specific LDEF data element and the data contained in that segment.

  3. Space shuttle system program definition. Volume 2: Technical report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The Phase B Extension of the Space Shuttle System Program Definition study was redirected to apply primary effort to consideration of space shuttle systems utilizing either recoverable pressure fed liquids or expendable solid rocket motor boosters. Two orbiter configurations were to be considered, one with a 15x60 foot payload bay with a 65,000 lb, due East, up-payload capability and the other with a 14x45 payload bay with 45,000 lb, of due East, up-payload. Both were to use three SSME engines with 472,000 lb of vacuum thrust each. Parallel and series burn ascent modes were to be considered for the launch configurations of primary interest. A recoverable pump-fed booster is included in the study in a series burn configuration with the 15x60 orbiter. To explore the potential of the swing engine orbiter configuration in the pad abort case, it is included in the study matrix in two launch configurations, a series burn pressure fed BRB and a parallel burn SRM. The resulting matrix of configuration options is shown. The principle objectives of this study are to evaluate the cost and technical differences between the liquid and solid propellant booster systems and to assess the development and operational cost savings available with a smaller orbiter.

  4. A systematic review of technical evaluation in telemedicine systems.

    PubMed

    Thiyagarajan, C A; Clarke, M

    2006-01-01

    We conducted a systematic review of the literature to critically analyse the evaluation and assessment frameworks that have been applied to telemedicine systems. Subjective methods were predominantly used for technical evaluation (59 %), e.g. Likert scale. Those including objective measurements (41%) were restricted to simple metrics such as network time delays. Only three papers included a rigorous standards based objective approach. Our investigation has been unable to determine a definitive standards-based telemedicine evaluation framework that exists in the literature that may be applied systematically to assess and compare telemedicine systems. We conclude that work needs to be done to address this deficiency. We have therefore developed a framework that has been used to evaluate videoconferencing systems telemedicine applications. Our method seeks to be simple to allow relatively inexperienced users to make measurements, is objective and repeatable, is standards based, is inexpensive and requires little specialist equipment. We use the EIA 1956 broadcast test card to assess resolution, grey scale and for astigmatism. Colour discrimination is assessed with the TE 106 and Ishihara 24 colour scale chart. Network protocol analysis software is used to assess network performance (throughput, delay, jitter, packet loss). PMID:17946758

  5. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    SciTech Connect

    CALMUS, R.B.

    1999-05-18

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward.

  6. Technical Report for Water Circulation Pumping System for Trihalomethanes (THMs)

    SciTech Connect

    Bellah, W.

    2015-06-08

    The TSWWS was added as an active source of supply to the permit (No. 03-10-13P-003) in 2010, but has never been used due to the potential for formation of trihalomethanes (THMs) in the distribution system. THMs are formed as a by-product when chlorine is used to disinfect water for drinking. THMs are a group of chemicals generally referred to as disinfection by-products (DBPs). THMs result from the reaction of chlorine with organic matter that is present in the water. Some of the THMs are volatile and may easily vaporize into the air. This fact forms the basis of the design of the system discussed in this technical report. In addition, the design is based on the results of a study that has shown success using aeration as a means to reduce TTHMs to within allowable concentration levels with turn-over times as long as ten days. The Primary Drinking Water Standards of Regulated Contaminants Maximum Contaminant Level (MCL) for TTHMs is 80 parts per billion (ppb). No other changes to the existing drinking water distribution system and chlorination operations are anticipated before switching to the TSWWS as the primary drinking water source. The two groundwater wells (Wells 20 and 18) which are currently the primary and backup water sources for the system would be maintained for use as backup supply. In the future, one of the wells may be removed from the system. A permit amendment would be filed at that time if this modification was deemed appropriate.

  7. INTERIM STORAGE AND LONG TERM DISPOSAL OF RESEARCH REACTOR SPENT FUEL

    SciTech Connect

    Vinson, D

    2006-08-22

    Aluminum clad research reactor spent nuclear fuel (SNF) is currently being consolidated in wet storage basins (pools). Approximately 20 metric tons (heavy metal) of aluminum-based spent nuclear fuel (Al-SNF) is being consolidated for treatment, packaging, interim storage, and preparation for ultimate disposal in a geologic repository. The storage and disposal of Al-SNF are subject to requirements that provide for safety and acceptable radionuclide release. The options studied for interim storage of SNF include wet storage and dry storage. Two options have also been studied to develop the technical basis for the qualification and repository disposal of aluminum spent fuel. The two options studied include Direct Disposal and Melt-Dilute treatment. The implementation of these options present relative benefits and challenges. Both the Direct Disposal and the Melt-Dilute treatment options have been developed and their technical viability assessed. Adaptation of the melt-dilute technology for the treatment of spent fuel offers the benefits of converting the spent fuel into a proliferation resistant form and/or significantly reducing the volume of the spent fuel. A Mobile Melt-Dilute system concept has emerged to realize these benefits and a prototype system developed. The application of the melt-dilute technology for the treatment of legacy nuclear materials has been evaluated and also offers the promise for the safe disposal of these materials.

  8. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of...

  9. 78 FR 42753 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-17

    ... Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on July 31 and... applicable to information systems equipment and technology. Wednesday, July 31 Open Session: 1. Welcome...

  10. 77 FR 37652 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on July 25, 2012, 9... controls applicable to information systems equipment and technology. Wednesday, July 25 Open Session...

  11. 75 FR 64258 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    ... Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on November 3 and 4... information systems equipment and technology. Wednesday, November 3 Public Session 1. Welcome...

  12. 76 FR 39845 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on July 27 and 28... information systems equipment and technology. Wednesday, July 27 Public Session 1. Welcome and...

  13. 78 FR 63162 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on November 6 and 7... information systems equipment and technology. Wednesday, November 6 Open Session 1. Welcome and...

  14. 77 FR 24178 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on May 8 and 9... information systems equipment and technology. Tuesday, May 8 Open Session 1. Welcome and Introductions...

  15. 75 FR 1339 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on January 27 and... applicable to information systems equipment and technology. Wednesday, January 27 Open Session 1. Welcome...

  16. 76 FR 64895 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-19

    ... Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on November 2 and 3... information systems equipment and technology. Wednesday, November 2 Public Session 1. Welcome...

  17. 75 FR 39919 - Information Systems, Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... Bureau of Industry and Security Information Systems, Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on July 28 and 29... information systems equipment and technology. Wednesday, July 28 Public Session 1. Welcome and...

  18. 78 FR 24160 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on May 7 and 8... information systems equipment and technology. Tuesday, May 7 Open Session 1. Welcome and Introductions....

  19. Technical Assistance Model for Long-Term Systems Change: Three State Examples

    ERIC Educational Resources Information Center

    Kasprzak, Christina; Hurth, Joicey; Lucas, Anne; Marshall, Jacqueline; Terrell, Adriane; Jones, Elizabeth

    2010-01-01

    The National Early Childhood Technical Assistance Center (NECTAC) Technical Assistance (TA) Model for Long-Term Systems Change (LTSC) is grounded in conceptual frameworks in the literature on systems change and systems thinking. The NECTAC conceptual framework uses a logic model approach to change developed specifically for states' infant and…

  20. Satellite power system concept development and evaluation program system definition technical assessment report

    SciTech Connect

    Not Available

    1980-12-01

    The results of the system definition studies conducted by NASA as a part of the Department of Energy/National Aeronautics and Space Administration SPS Concept Development and Evaluation Program are summarized. The purpose of the system definition efforts was to identify and define candidate SPS concepts and to evaluate the concepts in terms of technical and cost factors. Although the system definition efforts consisted primarily of evaluation and assessment of alternative technical approaches, a reference system was also defined to facilitate economic, environmental, and societal assessments by the Department of Energy. This reference system was designed to deliver 5 GW of electrical power to the utility grid. Topics covered include system definition; energy conversion and power management; power transmission and reception; structures, controls, and materials; construction and operations; and space transportation.

  1. Evaluation of Worker Profiling and Reemployment Services Systems: Interim Report. Unemployment Insurance Occasional Paper 96-1.

    ERIC Educational Resources Information Center

    Hawkins, Evelyn K.; And Others

    The Evaluation of Worker Profiling and Reemployment Services (WPRS) systems was designed to provide the U.S. Department of Labor information on how states are designing, implementing, and operating their worker profiling and reemployment services systems for dislocated workers and to compare the effectiveness of different state approaches to…

  2. Complex socio-technical systems: Characterization and management guidelines.

    PubMed

    Righi, Angela Weber; Saurin, Tarcisio Abreu

    2015-09-01

    Although ergonomics has paid increasing attention to the perspective of complexity, methods for its operationalization are scarce. This study introduces a framework for the operationalization of the "attribute view" of complexity, which involves: (i) the delimitation of the socio-technical system (STS); (ii) the description of four complexity attributes, namely a large number of elements in dynamic interactions, a wide diversity of elements, unexpected variability, and resilience; (iii) the assessment of six management guidelines, namely design slack, give visibility to processes and outcomes, anticipate and monitor the impacts of small changes, monitor the gap between prescription and practice, encourage diversity of perspectives when making decisions, and create an environment that supports resilience; and (iv) the identification of leverage points for improving the STS design, based on both the analysis of relationships among the attributes and their classification as irreducible/manageable complexity, and liability/asset. The use of the framework is illustrated by the study of an emergency department of a University hospital. Data collection involved analysis of documents, observations of work at the front-line, interviews with employees, and the application of questionnaires. PMID:25959314

  3. Electric fish as natural models for technical sensor systems

    NASA Astrophysics Data System (ADS)

    von der Emde, Gerhard; Bousack, Herbert; Huck, Christina; Mayekar, Kavita; Pabst, Michael; Zhang, Yi

    2009-05-01

    Instead of vision, many animals use alternative senses for object detection. Weakly electric fish employ "active electrolocation", during which they discharge an electric organ emitting electrical current pulses (electric organ discharges, EOD). Local EODs are sensed by electroreceptors in the fish's skin, which respond to changes of the signal caused by nearby objects. Fish can gain information about attributes of an object, such as size, shape, distance, and complex impedance. When close to the fish, each object projects an 'electric image' onto the fish's skin. In order to get information about an object, the fish has to analyze the object's electric image by sampling its voltage distribution with the electroreceptors. We now know a great deal about the mechanisms the fish use to gain information about objects in their environment. Inspired by the remarkable capabilities of weakly electric fish in detecting and recognizing objects with their electric sense, we are designing technical sensor systems that can solve similar sensing problems. We applied the principles of active electrolocation to devices that produce electrical current pulses in water and simultaneously sense local current densities. Depending on the specific task, sensors can be designed which detect an object, localize it in space, determine its distance, and measure certain object properties such as material properties, thickness, or material faults. We present first experiments and FEM simulations on the optimal sensor arrangement regarding the sensor requirements e. g. localization of objects or distance measurements. Different methods of the sensor read-out and signal processing are compared.

  4. Aerial Measuring System Technical Integration Annual Report 2002

    SciTech Connect

    Bechtel Nevada Remote Sensing Laboratory

    2003-06-01

    Fiscal Year 2002 is the second year of a five-year commitment by the U.S. Department of Energy, National Nuclear Security Administration (NNSA) to invest in development of new and state-of-the-art technologies for the Aerial Measuring Systems (AMS) project. In 2000, NNSA committed to two million dollars for AMS Technical Integration (TI) for each of five years. The tragedy of September 11, 2001, profoundly influenced the program. NNSA redirected people and funding resources at the Remote Sensing Laboratory (RSL) to more immediate needs. Funds intended for AMS TI were redirected to NNSA's new posture of leaning further forward throughout. AMS TI was brought to a complete halt on December 10, 2001. Then on April 30, 2002, NNSA Headquarters allowed the restart of AMS TI at the reduced level of $840,000. The year's events resulted in a slow beginning of several projects, some of which were resumed only a few weeks before the AMS TI Symposium held at RSL on July 30.

  5. INTERIM GUIDANCE FOR DEVELOPING GLOBAL POSITIONING SYSTEM DATA COLLECTION STANDARD OPERATING PROCEDURES AND QUALITY ASSURANCE PROJECT PLANS

    EPA Science Inventory

    The United States Environmental Protection Agency Geospatial Quality Council developed this document to harmonize the process of collecting, editing, and exporting spatial data of known quality using the Global Positioning System (GPS). Each organizational entity may adopt this d...

  6. ECALS: loading studies interim report October 2013

    USGS Publications Warehouse

    Klymus, Katy; Richter, Cathy; Chapman, Duane; Paukert, Craig P.

    2013-01-01

    Here we follow up the loading studies interim report from July 2013 and include results from laboratory studies assessing the effects of diet on eDNA shedding rates by bigheaded carps(silver and bighead carp). In order to understand how eDNA behavesin the environment, we must understand how it enters the system. In our July interim report, we addressed three of our four hypotheses that could influence the shedding rate of eDNA by these fish (Table 1; hypotheses A, B and D). We now provide results from studies that tested the fourth hypothesis (C), cellular debris from the gut-lining shed via excrementis a major source of shed eDNA.

  7. FY07 Summary of System Interface and Support Systems R&D and Technical Issues Map

    SciTech Connect

    Steven R. Sherman

    2007-09-01

    This document provides a summary of research and development activities in the System Interface and Support Systems area of the DOE Nuclear Hydrogen Initiative in FY 2007. Project cost and performance data obtained from the PICS system, at least up through July 2007, are presented and analyzed. Brief summaries of accomplishments and references are provided. A mapping of System Interface and Support Systems technical issues versus the work performed is updated and presented. Lastly, near-term research plans are described, and recommendatioins are provided for additional research.

  8. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical Requirements for Class A Automatic Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS)...

  9. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Technical Requirements for Class A Automatic Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS)...

  10. 76 FR 323 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF COMMERCE Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on January 26 and 27, 2011, 9 a.m., at the Space and...

  11. 7 CFR 274.8 - Functional and technical EBT system requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... for the SNAP account; (ii) Comply with the requirements of 12 CFR part 205 (Regulation E) in addition... 7 Agriculture 4 2011-01-01 2011-01-01 false Functional and technical EBT system requirements. 274... PROGRAM BENEFITS § 274.8 Functional and technical EBT system requirements. (a) Functional...

  12. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system...

  13. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system...

  14. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system...

  15. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system...

  16. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system...

  17. Planning a text-management system for technical publications at Oak Ridge National Laboratory

    SciTech Connect

    Williams, E.N.; McCulloch, R.D.

    1980-01-01

    The planning and evolution of the centralized text-management system (CTMS) being implemented by the Technical Publications Department of the Oak Ridge National Laboratory's Information Division is described. The CTMS is a shared-logic system that provides for easy composition of technical documentation, including multilevel mathematics and complex tables. 3 figures.

  18. A COMPREHENSIVE TECHNICAL REVIEW OF THE DEMONSTRATION BULK VITRIFICATION SYSTEM

    SciTech Connect

    SCHAUS, P.S.

    2006-09-29

    In May 2006, CH2M Hill Hanford Group, Inc. chartered an Expert Review Panel (ERP) to review the current status of the Demonstration Bulk Vitrification System (DBVS). It is the consensus of the ERP that bulk vitrification is a technology that requires further development and evaluation to determine its potential for meeting the Hanford waste stabilization mission. No fatal flaws (issues that would jeopardize the overall DBVS mission that cannot be mitigated) were found, given the current state of the project. However, a number of technical issues were found that could significantly affect the project's ability to meet its overall mission as stated in the project ''Justification of Mission Need'' document, if not satisfactorily resolved. The ERP recognizes that the project has changed from an accelerated schedule demonstration project to a formally chartered project that must be in full compliance with DOE 413.3 requirements. The perspective of the ERP presented herein, is measured against the formally chartered project as stated in the approved Justification of Mission Need document. A justification of Mission Need document was approved in July 2006 which defined the objectives for the DBVS Project. In this document, DOE concluded that bulk vitrification is a viable technology that requires additional development to determine its potential applicability to treatment of a portion of the Hanford low activity waste. The DBVS mission need statement now includes the following primary objectives: (1) process approximately 190,000 gallons of Tank S-109 waste into fifty 100 metric ton boxes of vitrified product; (2) store and dispose of these boxes at Hanford's Integrated Disposal Facility (IDF); (3) evaluate the waste form characteristics; (4) gather pilot plant operability data, and (5) develop the overall life cycle system performance of bulk vitrification and produce a comparison of the bulk vitrification process to building a second LAW Immobilization facility or other

  19. Technical Review of the Laboratory Biosphere Closed Ecological System Facility

    NASA Astrophysics Data System (ADS)

    Dempster, W.; van Thillo, M.; Alling, A.; Allen, J.; Silverstone, S.; Nelson, M.

    The "Laboratory Biosphere", a new closed ecological system facility in Santa Fe, New Mexico (USA) has been constructed and became operational in May 2002. Built and operated by the Global Ecotechnics consortium (Biosphere Technologies and Biosphere Foundation with Biospheric Design Inc., and the Institute of Ecotechnics), the research apparatus for intensive crop growth, biogeochemical cycle dynamics and recycling of inedible crop biomass comprises a sealed cylindrical steel chamber and attached variable volume chamber (lung) to prevent pressures caused by the expansion and contraction of the contained air. The cylindrical growing chamber is 3.7m (12 feet) long and 3.7m (12 foot) diameter, giving an internal volume of 34 m3 (1200 ft 3 ). The two crop growth beds cover 5.5 m2, with a soil depth of 0.3m (12 inches), with 12 x 1000 watt high-pressure sodium lights capable of variable lighting of 40-70 mol per m2 per day. A small soil bed reactor in the chamber can be activated to help with metabolism of chamber trace gases. The volume of the attached variable volume chamber (lung) can range between 0-11 m3 (0-400 ft 3 ). Evapotranspired and soil leachate water are collected, combined and recycled to water the planting beds. Sampling ports enable testing of water quality of leachate, condensate and irrigation water. Visual inspection windows provide views of the entire interior and growing beds. The chamber is also outfitted with an airlock to minimize air exchange when people enter and work in the chamber. Continuous sensors include atmospheric CO2 and oxygen, temperature, humidity, soil moisture, light level and water levels in reservoirs. Both "sniffer" (air ports) and "sipper" (water ports) will enable collection of water or air samples for detailed analysis. This paper reports on the development of this new soil-based bioregenerative life support closed system apparatus and its technical challenges and capabilities.

  20. Base program interim phase test procedure - Coherent Laser Vision System (CLVS). Final report, September 27, 1994--January 30, 1997

    SciTech Connect

    1997-05-01

    The purpose of the CLVS research project is to develop a prototype fiber-optic based Coherent Laser Vision System suitable for DOE`s EM Robotics program. The system provides three-dimensional (3D) vision for monitoring situations in which it is necessary to update geometrics on the order of once per second. The CLVS project plan required implementation in two phases of the contract, a Base Contract and a continuance option. This is the Test Procedure and test/demonstration results presenting a proof-of-concept for a system providing three-dimensional (3D) vision with the performance capability required to update geometrics on the order of once per second.

  1. ANTHRAX TECHNICAL ASSISTANCE DOCUMENT

    EPA Science Inventory

    The Anthrax TAD was developed as an Interim Draft Final technical resource in November 2003. It is specifically for response to an actual or suspected terrorist release of anthrax (i.e., it is not intended for response to anthrax in agricultural settings.). The TAD was provided ...

  2. The ESO Product Data Management System — A New Home for ESO's Technical Documents

    NASA Astrophysics Data System (ADS)

    Kraus, M.; Tamai, R.; Jolley, P.; Hess, G.

    2013-09-01

    Originally the technical archives at ESO grew organically and lacked a single coherent storage and access system. A search for a powerful product data management (PDM) system to unify the document archives of observatory, telescope and instrument technical material was initiated. After a careful assessment of the possible systems, it was decided to implement the Kronodoc system and its recent introduction as the ESO PDM system is described.

  3. Reconstruction of the System for Technical Education and Improvement of Teachers' Abilities

    NASA Astrophysics Data System (ADS)

    Shioiri, Mutsuo

    It is necessary to reconstruct the system for technical education and to improve teachers' abilities in order to educate children who have a great interest in creation. This paper describes that, the revised education ministry guidelines, the relation between the reconstruction of system for technical education and the combined primary and junior-high school, the improvement of teachers' abilities, the change of teacher service examination, the technical education in junior high school, and the advertisement of the importance of technical education according to the report of the central education council.

  4. Functional Analysis and Preliminary Specifications for a Single Integrated Central Computer System for Secondary Schools and Junior Colleges. Interim Report.

    ERIC Educational Resources Information Center

    1968

    The present report proposes a central computing facility and presents the preliminary specifications for such a system. It is based, in part, on the results of earlier studies by two previous contractors on behalf of the U.S. Office of Education. The recommendations are based upon the present contractors considered evaluation of the earlier…

  5. Task Force to Study the Governance, Coordination, and Funding of the University System of Maryland. 1998 Interim Report.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Legislative Services, Annapolis.

    The report was prepared by a task force appointed to examine issues related to the University System of Maryland (USM) ten years after its creation in 1988. The task force focused on key issues raised by stakeholders and higher education experts, including statewide goals and priorities for the USM; duplication and overlap of authority between the…

  6. Technical Issues Map for the NHI System Interface and Support Systems Area: 1st Quarter FY 07

    SciTech Connect

    Steven R. Sherman

    2006-12-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway. The technical issues are ranked according to priority and by assumed resolution dates. Due to funding limitations, not all high-priority technical issues are under study at the present time, and more resources will need to be dedicated to tackling such issues in the future. This technical issues map is useful for understanding the relative importance of various technical challenges and will be used as a planning tool for future work package planning.

  7. Gen IV Nuclear Energy Systems Interim Status Report on Pre-conceptual LFR Design Studies and Evaluations

    SciTech Connect

    Halsey, W G; Brown, N W; Smith, C F; Sienicki, J J; Moisseytsev, A V; Kim, S J; Smith, M A; Yang, W S; Williamson, M; Li, N

    2005-02-09

    Previous pre-conceptual core neutronics and system thermal hydraulics calculations initiated the investigation of viability of a Small Secure Transportable Autonomous Reactor (SSTAR) lead-cooled small modular fast reactor concept.1 The calculations indicated that a single-phase natural circulation SSTAR reactor concept with good core reactor physics performance, good system thermal hydraulics performance, and a high Supercritical Carbon Dioxide (S-CO{sub 2}) Brayton cycle efficiency of 40 % may be viable at an electrical power of 18 MWe (45 MWt). Pre-conceptual studies of SSTAR viability have continued with the objective of improving the system thermal hydraulic performance and raising the plant efficiency as well as extending the neutronics analysis. This effort has been motivated by several considerations. First, the initial Pre-conceptual studies were focused upon a ''pancake'' core having a height-to-diameter of 0.5. It was found that a compact core with high average burn up could be realized with a height-to-diameter ratio of 0.8. Second, the initial assumed reactor vessel height of 12.2 meters limited the height of the Pb-to-CO{sub 2} in-reactor heat exchangers (HXs) which reduced the efficiency of supercritical carbon dioxide (S-CO2) Brayton cycle power converter. It was found that by increasing the reactor vessel height to 18 meters, the greater driving head for single-phase natural circulation would offset both the greater pressure drop of the 0.8 height-to-diameter ratio core as well as the pressure drop of taller HXs. This has enabled the plant efficiency to be increased from 40 to 43 % and the plant electrical power to be raised from 18 to 20 MWe. Third, reactivity feedback coefficients, which had previously not been generated for SSTAR, have now been calculated for the core. The reactivity feedback coefficients provide a basis for future investigation of the autonomous load following and passive shutdown behavior of the reactor. The current status of

  8. Microcomputer Intelligence for Technical Training (MITT): The evolution of an intelligent tutoring system

    NASA Technical Reports Server (NTRS)

    Norton, Jeffrey E.; Wiederholt, Bradley J.; Johnson, William B.

    1990-01-01

    Microcomputer Intelligence for Technical Training (MITT) uses Intelligent Tutoring System (OTS) technology to deliver diagnostic training in a variety of complex technical domains. Over the past six years, MITT technology has been used to develop training systems for nuclear power plant diesel generator diagnosis, Space Shuttle fuel cell diagnosis, and message processing diagnosis for the Minuteman missile. Presented here is an overview of the MITT system, describing the evolution of the MITT software and the benefits of using the MITT system.

  9. Report on interim storage of spent nuclear fuel

    SciTech Connect

    Not Available

    1993-04-01

    The report on interim storage of spent nuclear fuel discusses the technical, regulatory, and economic aspects of spent-fuel storage at nuclear reactors. The report is intended to provide legislators state officials and citizens in the Midwest with information on spent-fuel inventories, current and projected additional storage requirements, licensing, storage technologies, and actions taken by various utilities in the Midwest to augment their capacity to store spent nuclear fuel on site.

  10. Methods Data Qualification Interim Report

    SciTech Connect

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  11. The reform of the rural cooperative medical system in the People's Republic of China: interim experience in 14 pilot counties.

    PubMed

    Carrin, G; Ron, A; Hui, Y; Hong, W; Tuohong, Z; Licheng, Z; Shuo, Z; Yide, Y; Jiaying, C; Qicheng, J; Zhaoyang, Z; Jun, Y; Xuesheng, L

    1999-04-01

    During the 1960's and 1970's the Chinese government encouraged the 'rural cooperative medical systems' (RCMS), in order to ensure access to basic health care among the rural population. There was a break in the development of the RCMS in the early 1980's, as a consequence of market economic reforms. These reforms involved a shift from a communal to a household production system. As a result the collective way of financing rural health care was more or less abandoned. However, the government of the People's Republic of China was aware of the need to provide social protection against health care expenses. In March 1994 the government initiated a project to reestablish the RCMS. This project was implemented on a pilot basis in 14 counties of seven provinces. The reestablishment of the RCMS would be guided by the basic principles of health insurance. In October 1995, a first mid-term evaluation of the RCMS Project was held. One of the major research questions concerned the extent to which the RCMS had reduced the risk of paying health care bills that would otherwise be a burden on families. This article addresses this question and assesses the results obtained after two years of RCMS experimental work. A general finding is that the population structure by occupation and income varies, and that the RCMS has adapted itself to this variety. It is also confirmed that the burden of health care costs on families was reduced, more so in some counties than in others, but this reduction has been modest. The research results indicate that there is ample room for improvement. The outlook is hopeful, however. At the national level, there is now systematic thinking about RCMS. The current RCMS work is also having a considerable influence on other counties that are keen to reestablish the RCMS. PMID:10192562

  12. Creating a Canonical Scientific and Technical Information Classification System for NCSTRL+

    NASA Technical Reports Server (NTRS)

    Tiffany, Melissa E.; Nelson, Michael L.

    1998-01-01

    The purpose of this paper is to describe the new subject classification system for the NCSTRL+ project. NCSTRL+ is a canonical digital library (DL) based on the Networked Computer Science Technical Report Library (NCSTRL). The current NCSTRL+ classification system uses the NASA Scientific and Technical (STI) subject classifications, which has a bias towards the aerospace, aeronautics, and engineering disciplines. Examination of other scientific and technical information classification systems showed similar discipline-centric weaknesses. Traditional, library-oriented classification systems represented all disciplines, but were too generalized to serve the needs of a scientific and technically oriented digital library. Lack of a suitable existing classification system led to the creation of a lightweight, balanced, general classification system that allows the mapping of more specialized classification schemes into the new framework. We have developed the following classification system to give equal weight to all STI disciplines, while being compact and lightweight.

  13. EMCS Retrofit Analysis - Interim Report

    SciTech Connect

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  14. The Effect of Functional Flow Diagrams on Apprentice Aircraft Mechanics' Technical System Understanding.

    ERIC Educational Resources Information Center

    Johnson, Scott D.; Satchwell, Richard E.

    1993-01-01

    Describes an experimental study that tested the impact of a conceptual illustration on college students' understanding of the structure, function, and behavior of complex technical systems. The use of functional flow diagrams in aircraft mechanics' training is explained, a concept map analysis is discussed, and implications for technical training…

  15. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Technical Requirements for Class A Automatic... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment...; (2) Copies of the test report and test data obtained from the test facility showing that the...

  16. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Technical Requirements for Class A Automatic... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment...; (2) Copies of the test report and test data obtained from the test facility showing that the...

  17. The National Early Childhood Technical Assistance Center Model for Long-Term Systems Change

    ERIC Educational Resources Information Center

    Kahn, Lynne; Hurth, Joicey; Kasprzak, Christina M.; Diefendorf, Martha J.; Goode, Susan E.; Ringwalt, Sharon S.

    2009-01-01

    The National Early Childhood Technical Assistance Center was charged by the U.S. Department of Education's Office of Special Education Programs from October 2001 through September 2006 to develop, implement, and evaluate an approach to technical assistance (TA) that would result in sustainable systems change in state early intervention and…

  18. 47 CFR 15.510 - Technical requirements for through D-wall imaging systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for through D-wall... FREQUENCY DEVICES Ultra-Wideband Operation § 15.510 Technical requirements for through D-wall imaging... section is limited to through-wall imaging systems operated by law enforcement, emergency rescue...

  19. 47 CFR 15.510 - Technical requirements for through D-wall imaging systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for through D-wall... FREQUENCY DEVICES Ultra-Wideband Operation § 15.510 Technical requirements for through D-wall imaging... section is limited to through-wall imaging systems operated by law enforcement, emergency rescue...

  20. 47 CFR 15.510 - Technical requirements for through D-wall imaging systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for through D-wall... FREQUENCY DEVICES Ultra-Wideband Operation § 15.510 Technical requirements for through D-wall imaging... section is limited to through-wall imaging systems operated by law enforcement, emergency rescue...

  1. 47 CFR 15.510 - Technical requirements for through D-wall imaging systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for through D-wall... FREQUENCY DEVICES Ultra-Wideband Operation § 15.510 Technical requirements for through D-wall imaging... section is limited to through-wall imaging systems operated by law enforcement, emergency rescue...

  2. 47 CFR 15.519 - Technical requirements for hand held UWB systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for hand held UWB... DEVICES Ultra-Wideband Operation § 15.519 Technical requirements for hand held UWB systems. (a) UWB devices operating under the provisions of this section must be hand held, i.e., they are relatively...

  3. 47 CFR 15.519 - Technical requirements for hand held UWB systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for hand held UWB... DEVICES Ultra-Wideband Operation § 15.519 Technical requirements for hand held UWB systems. (a) UWB devices operating under the provisions of this section must be hand held, i.e., they are relatively...

  4. 47 CFR 15.519 - Technical requirements for hand held UWB systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for hand held UWB... DEVICES Ultra-Wideband Operation § 15.519 Technical requirements for hand held UWB systems. (a) UWB devices operating under the provisions of this section must be hand held, i.e., they are relatively...

  5. 47 CFR 15.519 - Technical requirements for hand held UWB systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for hand held UWB... DEVICES Ultra-Wideband Operation § 15.519 Technical requirements for hand held UWB systems. (a) UWB devices operating under the provisions of this section must be hand held, i.e., they are relatively...

  6. 47 CFR 15.519 - Technical requirements for hand held UWB systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for hand held UWB... DEVICES Ultra-Wideband Operation § 15.519 Technical requirements for hand held UWB systems. (a) UWB devices operating under the provisions of this section must be hand held, i.e., they are relatively...

  7. 77 FR 24950 - Midwest Independent Transmission, System Operator, Inc.; Supplemental Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Midwest Independent Transmission, System Operator, Inc.; Supplemental Notice of Technical Conference As announced in the Notice of Technical Conference issued on April 4, 2012, and as required in the Commission's...

  8. Computer Education Curriculum. Connecticut Vocational Technical School System. Version 4.

    ERIC Educational Resources Information Center

    Kittell, Linda; Walczak, Joseph

    This computer education curriculum is designed specifically for Connecticut's Regional Vocational Technical Schools' grade 9 computer education course. Each of the 24 lessons is expected to cover at least one class period of 50 minutes. Introductory materials include a listing of course goals and objectives, an outline of sequence and scope via…

  9. 48 CFR 301.603-3 - Interim appointments.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Interim appointments. 301.603-3 Section 301.603-3 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL HHS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and Responsibilities...

  10. 48 CFR 301.603-3 - Interim appointments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Interim appointments. 301.603-3 Section 301.603-3 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL HHS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and Responsibilities...

  11. 48 CFR 301.603-3 - Interim appointments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Interim appointments. 301.603-3 Section 301.603-3 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL HHS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and Responsibilities...

  12. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... provides systems engineering and technical direction for a system but does not have overall contractual... consultant to a supplier of the system or any of its major components. (b) Systems engineering includes a... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Providing...

  13. 48 CFR 209.571-7 - Systems engineering and technical assistance contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Systems engineering and... Organizational and Consultant Conflicts of Interest 209.571-7 Systems engineering and technical assistance contracts. (a) Agencies shall obtain advice on systems architecture and systems engineering matters...

  14. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... provides systems engineering and technical direction for a system but does not have overall contractual... consultant to a supplier of the system or any of its major components. (b) Systems engineering includes a... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Providing...

  15. 48 CFR 209.571-7 - Systems engineering and technical assistance contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Systems engineering and... Organizational and Consultant Conflicts of Interest 209.571-7 Systems engineering and technical assistance contracts. (a) Agencies shall obtain advice on systems architecture and systems engineering matters...

  16. 48 CFR 209.571-7 - Systems engineering and technical assistance contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Systems engineering and... Organizational and Consultant Conflicts of Interest 209.571-7 Systems engineering and technical assistance contracts. (a) Agencies shall obtain advice on systems architecture and systems engineering matters...

  17. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... provides systems engineering and technical direction for a system but does not have overall contractual... consultant to a supplier of the system or any of its major components. (b) Systems engineering includes a... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Providing...

  18. Comparing technical efficiency of farms with an automatic milking system and a conventional milking system.

    PubMed

    Steeneveld, W; Tauer, L W; Hogeveen, H; Oude Lansink, A G J M

    2012-12-01

    Changing from a conventional milking system (CMS) to an automatic milking system (AMS) necessitates a new management approach and a corresponding change in labor tasks. Together with labor savings, AMS farms have been found to have higher capital costs, primarily because of higher maintenance costs and depreciation. Therefore, it is hypothesized that AMS farms differ from CMS farms in capital:labor ratio and possibly their technical efficiency, at least during a transition learning period. The current study used actual farm accounting data from dairy farms in the Netherlands with an AMS and a CMS to investigate the empirical substitution of capital for labor in the AMS farms and to determine if the technical efficiency of the AMS farms differed from the CMS farms. The technical efficiency estimates were obtained with data envelopment analysis. The 63 AMS farms and the 337 CMS farms in the data set did not differ in general farm characteristics such as the number of cows, number of hectares, and the amount of milk quota. Farms with AMS have significantly higher capital costs (€12.71 per 100 kg of milk) than CMS farms (€10.10 per 100 kg of milk). Total labor costs and net outputs were not significantly different between AMS and CMS farms. A clear substitution of capital for labor with the adoption of an AMS could not be observed. Although the AMS farms have a slightly lower technical efficiency (0.76) than the CMS farms (0.78), a significant difference in these estimates was not observed. This indicates that the farms were not different in their ability to use inputs (capital, labor, cows, and land) to produce outputs (total farm revenues). The technical efficiency of farms invested in an AMS in 2008 or earlier was not different from the farms invested in 2009 or 2010, indicating that a learning effect during the transition period was not observed. The results indicate that the economic performance of AMS and CMS farms are similar. What these results show is that

  19. Challenges in legislation, recycling system and technical system of waste electrical and electronic equipment in China.

    PubMed

    Zhang, Shengen; Ding, Yunji; Liu, Bo; Pan, De'an; Chang, Chein-chi; Volinsky, Alex A

    2015-11-01

    Waste electrical and electronic equipment (WEEE) has been one of the fastest growing waste streams worldwide. Effective and efficient management and treatment of WEEE has become a global problem. As one of the world's largest electronic products manufacturing and consumption countries, China plays a key role in the material life cycle of electrical and electronic equipment. Over the past 20 years, China has made a great effort to improve WEEE recycling. Centered on the legal, recycling and technical systems, this paper reviews the progresses of WEEE recycling in China. An integrated recycling system is proposed to realize WEEE high recycling rate for future WEEE recycling. PMID:26059074

  20. Effects of Interim Assessments on the Achievement Gap: Evidence from an Experiment

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia; van der Ploeg, Arie

    2015-01-01

    Motivated by the passage of the No Child Left Behind (NCLB) Act, all states operate accountability systems that measure and report school and student performance annually. The purpose of this study is to examine the effects of interim assessments on the achievement gap. The authors examine the impact of interim assessments throughout the…

  1. Central waste complex interim operational safety requirements

    SciTech Connect

    Bendixsen, R.B.; Ames, R.R., Fluor Daniel Hanford

    1997-03-20

    This Interim Operational Safety Requirements document supports the authorization basis for interim operations and identifies restrictions on interim operations for the disposal and storage of solid waste in the Central Waste Complex. The Central Waste Complex Interim Operational Safety Requirements provide the necessary controls on operations in the Central Waste Complex to ensure the radiological and hazardous material exposure will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, 1327 the public and the environment.

  2. School Leadership in Networked Schools: Deciphering the Impact of Large Technical Systems on Education.

    ERIC Educational Resources Information Center

    Davidson, Judith; Olson, Matthew

    2003-01-01

    Examines electronic networks leadership in education from perspective of the social nature of large technical systems. Focuses on the concepts of translation and social communication spaces. (Contains 31 references.)(PKP)

  3. Automated water monitor system field demonstration test report. Volume 2: Technical summary

    NASA Technical Reports Server (NTRS)

    Brooks, R. L.; Jeffers, E. L.; Perreira, J.; Poel, J. D.; Nibley, D.; Nuss, R. H.

    1981-01-01

    The NASA Automatic Water Monitor System was installed in a water reclamation facility to evaluate the technical and cost feasibility of producing high quality reclaimed water. Data gathered during this field demonstration test are reported.

  4. An approach to knowledge structuring for advanced phases of the Technical and Management Information System (TMIS)

    NASA Technical Reports Server (NTRS)

    Goranson, H. T.

    1986-01-01

    The Technical and Management Information System (TMIS) must employ on enlightened approach to its object structure, but basic issues in conceptual structuring remain to be resolved. Sirius outlines the necessary agenda and reports on progress toward solutions.

  5. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    EPA Science Inventory

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  6. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 3 2012-04-01 2012-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  7. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  8. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  9. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  10. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  11. An Interim President Sets the Stage

    ERIC Educational Resources Information Center

    Guardo, Carol J.

    2006-01-01

    An interim president often plays a crucial role in leading a college or university. In some instances, the interim can address and resolve troublesome issues and thus clear the way for the new president to generate progress. In others, the interim stays the course so that the institution maintains its momentum and seizes strategic opportunities to…

  12. Technical Assessment of Cryo-Compressed Hydrogen Storage Tank Systems for Automotive Applications

    SciTech Connect

    Ahluwalia, Rajesh; Hua, T. Q.; Peng, J. -K.; Lasher, S.; McKenney, Kurtis; Sinha, J.

    2009-12-01

    Technical report describing DOE's second assessment report on a third generation (Gen3) system capable of storing hydrogen at cryogenic temperatures within a pressure vessel on-board a vehicle. The report includes an overview of technical progress to date, including the potential to meet DOE onboard storage targets, as well as independent reviews of system cost and energy analyses of the technology paired with delivery costs.

  13. 48 CFR 209.571-7 - Systems engineering and technical assistance contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Systems engineering and technical assistance contracts. 209.571-7 Section 209.571-7 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts...

  14. Permitting plan for the high-level waste interim storage

    SciTech Connect

    Deffenbaugh, M.L.

    1997-04-23

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist.

  15. Electronic Inventory Systems and Barcode Technology: Impact on Pharmacy Technical Accuracy and Error Liability

    PubMed Central

    Oldland, Alan R.; May, Sondra K.; Barber, Gerard R.; Stolpman, Nancy M.

    2015-01-01

    Purpose: To measure the effects associated with sequential implementation of electronic medication storage and inventory systems and product verification devices on pharmacy technical accuracy and rates of potential medication dispensing errors in an academic medical center. Methods: During four 28-day periods of observation, pharmacists recorded all technical errors identified at the final visual check of pharmaceuticals prior to dispensing. Technical filling errors involving deviations from order-specific selection of product, dosage form, strength, or quantity were documented when dispensing medications using (a) a conventional unit dose (UD) drug distribution system, (b) an electronic storage and inventory system utilizing automated dispensing cabinets (ADCs) within the pharmacy, (c) ADCs combined with barcode (BC) verification, and (d) ADCs and BC verification utilized with changes in product labeling and individualized personnel training in systems application. Results: Using a conventional UD system, the overall incidence of technical error was 0.157% (24/15,271). Following implementation of ADCs, the comparative overall incidence of technical error was 0.135% (10/7,379; P = .841). Following implementation of BC scanning, the comparative overall incidence of technical error was 0.137% (27/19,708; P = .729). Subsequent changes in product labeling and intensified staff training in the use of BC systems was associated with a decrease in the rate of technical error to 0.050% (13/26,200; P = .002). Conclusions: Pharmacy ADCs and BC systems provide complementary effects that improve technical accuracy and reduce the incidence of potential medication dispensing errors if this technology is used with comprehensive personnel training. PMID:25684799

  16. Transportable educational programs for scientific and technical professionals: More effective utilization of automated scientific and technical data base systems

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D.

    1987-01-01

    This grant final report executive summary documents a major, long-term program addressing innovative educational issues associated with the development, administration, evaluation, and widespread distribution of transportable educational programs for scientists and engineers to increase their knowledge of, and facilitate their utilization of automated scientific and technical information storage and retrieval systems. This educational program is of very broad scope, being targeted at Colleges of Engineering and Colleges of Physical sciences at a large number of colleges and universities throughout the United States. The educational program is designed to incorporate extensive hands-on, interactive usage of the NASA RECON system and is supported by a number of microcomputer-based software systems to facilitate the delivery and usage of the educational course materials developed as part of the program.

  17. Advanced transportation system studies. Technical area 2: Heavy lift launch vehicle development. Volume 2; Technical Results

    NASA Technical Reports Server (NTRS)

    1995-01-01

    Sections 10 to 13 of the Advanced Transportation System Studies final report are included in this volume. Section 10 contains a copy of an executive summary that was prepared by Lockheed Space Operations Company (LSOC) to document their support to the TA-2 contract during the first-year period of performance of the contract, May 1992 through May 1993. LSOC participated on the TA-2 contract as part of the concurrent engineering launch system definition team, and provided outstanding heavy lift launch vehicle (HLLV) ground operations requirements and concept assessments for Lockheed Missiles and Space Company (LMSC) through an intercompany work transfer as well as providing specific HLLV ground operations assessments at the direction of NASA KSC through KSC funding that was routed to the TA-2 contract. Section 11 contains a copy of a vehicle-independent, launch system health management requirements assessment. The purpose of the assessment was to define both health management requirements and the associated interfaces between a generic advanced transportation system launch vehicle and all related elements of the entire transportation system, including the ground segment. Section 12 presents the major TA-2 presentations provided to summarize the significant results and conclusions that were developed over the course of the contract. Finally, Section 13 presents the design and assessment report on the first lunar outpost heavy lift launch vehicle.

  18. Loss of interim status (LOIS) under RCRA

    SciTech Connect

    Not Available

    1992-09-01

    The Resource Conservation and Recovery Act (RCRA) requires owners and operators of facilities that treat, store, or dispose of hazardous waste (TSDFs) to obtain an operating permit. Recognizing that it would take EPA many years to issue operating permits to all RCRA facilities, Congress created ``interim status`` under Section 3005(e) of the Act. Interim status allows facilities to operating permits to all RCRA facilities to operate under Subtitle C of RCRA until their permits are issued or denied. This information brief defines interim status and describes how failure to meet interim status requirements may lead to loss of interim status (LOIS).

  19. Advanced Transportation System Studies Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development Contract. Volume 2; Technical Results

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The purpose of the Advanced Transportation System Studies (ATSS) Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is Volume 2 of the final report for the contract. It provides documentation of selected technical results from various TA-2 analysis activities, including a detailed narrative description of the SSTO concept assessment results, a user's guide for the associated SSTO sizing tools, an SSTO turnaround assessment report, an executive summary of the ground operations assessments performed during the first year of the contract, a configuration-independent vehicle health management system requirements report, a copy of all major TA-2 contract presentations, a copy of the FLO launch vehicle final report, and references to Pratt & Whitney's TA-2 sponsored final reports regarding the identification of Russian main propulsion technologies.

  20. Data breaches. Interim final rule.

    PubMed

    2007-06-22

    This document establishes regulations to address data breaches regarding sensitive personal information that is processed or maintained by the Department of Veterans Affairs (VA). The regulations implement certain provisions of Title IX of the Veterans Benefits, Health Care, and Information Technology Act of 2006, which require promulgation of these regulations as an interim final rule. PMID:17674483

  1. An analysis of the technical status of high level radioactive waste and spent fuel management systems

    NASA Technical Reports Server (NTRS)

    English, T.; Miller, C.; Bullard, E.; Campbell, R.; Chockie, A.; Divita, E.; Douthitt, C.; Edelson, E.; Lees, L.

    1977-01-01

    The technical status of the old U.S. mailine program for high level radioactive nuclear waste management, and the newly-developing program for disposal of unreprocessed spent fuel was assessed. The method of long term containment for both of these waste forms is considered to be deep geologic isolation in bedded salt. Each major component of both waste management systems is analyzed in terms of its scientific feasibility, technical achievability and engineering achievability. The resulting matrix leads to a systematic identification of major unresolved technical or scientific questions and/or gaps in these programs.

  2. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Providing systems engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 9.505-1 Providing...

  3. 77 FR 22312 - Geomagnetic Disturbances to the Bulk-Power System; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ... Energy Regulatory Commission Geomagnetic Disturbances to the Bulk-Power System; Notice of Technical... Conference on Geomagnetic Disturbances to the Bulk-Power System on Monday, April 30, 2012, from 11 a.m. to 4... issues related to reliability of the Bulk-Power System as affected by geomagnetic disturbances....

  4. 75 FR 75186 - Interview Room Video System Standard Special Technical Committee Request for Proposals for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-02

    ... of Justice Programs Interview Room Video System Standard Special Technical Committee Request for... (NIJ) is in the process of developing a new Interview Room Video System Standard and corresponding... experience with video systems or experience with law enforcement operations. There are up to four...

  5. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system...

  6. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system...

  7. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system...

  8. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system...

  9. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system...

  10. Interim Service ISDN Satellite (ISIS) simulator development for advanced satellite designs and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.

    1992-01-01

    The simulation development associated with the network models of both the Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) and the Full Service ISDN Satellite (FSIS) architectures is documented. The ISIS Network Model design represents satellite systems like the Advanced Communications Technology Satellite (ACTS) orbiting switch. The FSIS architecture, the ultimate aim of this element of the Satellite Communications Applications Research (SCAR) Program, moves all control and switching functions on-board the next generation ISDN communications satellite. The technical and operational parameters for the advanced ISDN communications satellite design will be obtained from the simulation of ISIS and FSIS engineering software models for their major subsystems. Discrete event simulation experiments will be performed with these models using various traffic scenarios, design parameters, and operational procedures. The data from these simulations will be used to determine the engineering parameters for the advanced ISDN communications satellite.

  11. Technical results of Y-12/IAEA field trial of remote monitoring system

    SciTech Connect

    Corbell, B.H.; Whitaker, J.M.; Welch, J.

    1997-08-01

    A Remote Monitoring System (RMS) field trial has been conducted with the International Atomic Energy Agency (IAEA) on highly enriched uranium materials in a vault at the Oak Ridge Y-12 Plant. The RMS included a variety of Sandia, Oak Ridge, and Aquila sensor technologies which provide containment seals, video monitoring, radiation asset measurements, and container identification data to the on-site DAS (Data Acquisition System) by way of radio-frequency and Echelon LonWorks networks. The accumulated safeguards information was transmitted to the IAEA via satellite (COMSAT/RSI) and international telephone lines. The technologies tested in the remote monitoring environment are the RadCouple, RadSiP, and SmartShelf sensors from the ORSENS (Oak Ridge Sensors for Enhancing Nuclear Safeguards) technologies; the AIMS (Authenticated Item Monitoring System) motion sensor (AMS), AIMS fiber-optic seal (AFOS), ICAM (Image Compression and Authentication Module) video surveillance system, DAS (Data Acquisition System), and DIRS (Data and Image Review Station) from Sandia; and the AssetLAN identification tag, VACOSS-S seal, and Gemini digital surveillance system from Aquila. The field trial was conducted from October 1996 through May 1997. Tests were conducted during the monthly IAEA Interim Inventory Verification (IIV) inspections for evaluation of the equipment. Experience gained through the field trials will allow the technologies to be applied to various monitoring scenarios.

  12. 76 FR 69132 - Trademark Technical and Conforming Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    .... SUPPLEMENTARY INFORMATION: Background On June 24, 2010, the USPTO published an interim final rule at 75 FR 35973..., the interim final rule amending 37 CFR parts 2 and 7, which was published at 75 FR 35973 on June 24... Patent and Trademark Office 37 CFR Parts 2 and 7 RIN 0651-AC39 Trademark Technical and...

  13. NREL PV System Performance and Standards Technical Progress

    SciTech Connect

    Osterwald, C. R.

    2005-01-01

    This paper presents a brief overview of the status and accomplishments during Fiscal Year (FY)2004 of the Photovoltaic (PV) System Performance & Standards Subtask, which is part of PV Systems Engineering Project (a joint NREL-Sandia project).

  14. Solar heating and cooling technical data and systems analysis

    NASA Technical Reports Server (NTRS)

    Christensen, D. L.

    1977-01-01

    The research activities described herein were concentrated on the areas of economics, heating and cooling systems, architectural design, materials characteristics, climatic conditions, educational information packages, and evaluation of solar energy systems and components.

  15. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the procedures described in § 15.521. (f) Imaging systems operating under the provisions of this... bandwidth of an imaging system operating under the provisions of this section must be contained between...

  16. Technical Letter Report, An Evaluation of Ultrasonic Phased Array Testing for Reactor Piping System Components Containing Dissimilar Metal Welds, JCN N6398, Task 2A

    SciTech Connect

    Diaz, Aaron A.; Cinson, Anthony D.; Crawford, Susan L.; Anderson, Michael T.

    2009-11-30

    Research is being conducted for the U.S. Nuclear Regulatory Commission at the Pacific Northwest National Laboratory to assess the effectiveness and reliability of advanced nondestructive examination (NDE) methods for the inspection of light-water reactor components. The scope of this research encom¬passes primary system pressure boundary materials including dissimilar metal welds (DMWs), cast austenitic stainless steels (CASS), piping with corrosion-resistant cladding, weld overlays, inlays and onlays, and far-side examinations of austenitic piping welds. A primary objective of this work is to evaluate various NDE methods to assess their ability to detect, localize, and size cracks in steel components that challenge standard and/or conventional inspection methodologies. This interim technical letter report provides a summary of a technical evaluation aimed at assessing the capabilities of phased-array (PA) ultrasonic testing (UT) methods as applied to the inspection of small-bore DMW components that exist in the reactor coolant systems (RCS) of pressurized water reactors (PWRs). Operating experience and events such as the circumferential cracking in the reactor vessel nozzle-to-RCS hot leg pipe at V.C. Summer nuclear power station, identified in 2000, show that in PWRs where primary coolant water (or steam) are present under normal operation, Alloy 82/182 materials are susceptible to pressurized water stress corrosion cracking. The extent and number of occurrences of DMW cracking in nuclear power plants (domestically and internationally) indicate the necessity for reliable and effective inspection techniques. The work described herein was performed to provide insights for evaluating the utility of advanced NDE approaches for the inspection of DMW components such as a pressurizer surge nozzle DMW, a shutdown cooling pipe DMW, and a ferritic (low-alloy carbon steel)-to-CASS pipe DMW configuration.

  17. Management/Technical Interaction in Integrated Information System Development.

    ERIC Educational Resources Information Center

    Bagley, Clarence H.; Gardner, Don E.

    The integrated information system element of the management information system concept has practical applications for management in the areas of both information analysis and decision-model building. Four basic options for achieving integration in operational data systems are: a default option, the coordinated file option, the distributed…

  18. Incorporating Student Performance Measures into Teacher Evaluation Systems. Technical Report

    ERIC Educational Resources Information Center

    Steele, Jennifer L.; Hamilton, Laura S.; Stecher, Brian M.

    2010-01-01

    Many existing teacher evaluation and reward systems do not capture variation in teachers' ability to improve student performance on standardized tests. Improved access to longitudinal data systems that link teachers to students facilitates the development of systems that incorporate student achievement gains into teacher evaluations. However, two…

  19. Photovoltaic applications definition and photovoltaic system definition study in the agricultural sector. Volume 2: Technical results

    NASA Astrophysics Data System (ADS)

    Mengel, R. W.; Nadolski, T. P.; Sparks, D. C.; Young, S. K.; Yingst, A.

    1980-05-01

    This volume describes the technical results of the study of potential photovoltaic (P/V) applications in US agriculture. The results presented address all technical aspects of the program and include a summary of agricultural energy consumption. The objectives of the technical effort reported were to: (1) identify and characterize agricultural energy demands that can effectively use P/V power systems; (2) develop effective P/V system designs for the four most promising applications; (3) determine performance and cost estimates for the designs; and (4) recommend systems for early test and demonstration and critical issues requiring further systems studies. The farms chosen for conceptual design include; (1) poultry layer farm, (2) hog production farm, (3) beef feedlot, and (4) year round vegetable farm.

  20. NASA Technical Interchange Meeting (TIM): Advanced Technology Lifecycle Analysis System (ATLAS) Technology Tool Box

    NASA Technical Reports Server (NTRS)

    ONeil, D. A.; Craig, D. A.; Christensen, C. B.; Gresham, E. C.

    2005-01-01

    The objective of this Technical Interchange Meeting was to increase the quantity and quality of technical, cost, and programmatic data used to model the impact of investing in different technologies. The focus of this meeting was the Technology Tool Box (TTB), a database of performance, operations, and programmatic parameters provided by technologists and used by systems engineers. The TTB is the data repository used by a system of models known as the Advanced Technology Lifecycle Analysis System (ATLAS). This report describes the result of the November meeting, and also provides background information on ATLAS and the TTB.

  1. Technical drilling data acquisition and processing with an integrated computer system

    SciTech Connect

    Chevallier, J.J.; Quetier, F.P.; Marshall, D.W.

    1986-04-01

    Sedco Forex has developed an integrated computer system to enhance the technical performance of the company at various operational levels and to increase the understanding and knowledge of the drill crews. This paper describes the system and how it is used for recording and processing drilling data at the rig site, for associated technical analyses, and for well design, planning, and drilling performance studies at the operational centers. Some capabilities related to the statistical analysis of the company's operational records are also described, and future development of rig computing systems for drilling applications and management tasks is discussed.

  2. Advanced Thermal Barrier Coating System Development. Technical progress report

    SciTech Connect

    1998-09-21

    The objectives of the program are to provide an improved TBC system with increased temperature capability and improved reliability relative to current state of the art TBC systems. The development of such a coating system is essential to the ATS engine meeting its objectives. The base program consists of three phases: Phase I: Program Planning - Complete; Phase II: Development; and Phase III: Selected Specimen - Bench Test. Work is being performed in Phase II and III of the program.

  3. Advanced Thermal Barrier Coating System Development. Technical progress report

    SciTech Connect

    1999-10-15

    The objectives of the program are to provide an improved TBC system with increased temperature capability and improved reliability relative to current state of the art TBC systems. The development of such a coating system is essential to the ATS engine meeting its objectives. The base program consists of three phases: Phase I: Program Planning - Complete; Phase II: Development; and Phase III: Selected Specimen - Bench Test. Work is being performed in Phase II and III of the program.

  4. Challenge Study: A Project-Based Learning on a Wireless Communication System at Technical High School

    ERIC Educational Resources Information Center

    Terasawa, Ikuo

    2016-01-01

    The challenge study is a project based learning curriculum at Technical High School aimed at the construction of a wireless communication system. The first period was engineering issues in the construction of an artificial satellite and the second period was a positional locating system based on the general purpose wire-less device--ZigBee device.…

  5. Automated Technical Operations: Unified Ordering/Cataloging Systems at the Libraries of the Claremont Colleges.

    ERIC Educational Resources Information Center

    Teare, Robert F., Ed.

    Since 1966 the libraries of the Associated Claremont Colleges have developed an automated central acquisition and cataloging system. This system differs from most other technical service organizations and operations in three ways: (1) ordering and cataloging operations are integrated and blended to avoid duplicate and uncoordinated performance,…

  6. Computer Assisted Instruction in Navy Technical Training Using a Small Dedicated Computer System: Final Report.

    ERIC Educational Resources Information Center

    Ford, John D.; And Others

    An investigation was made of the feasibility of Computer Assisted Instruction (CAI) for Navy technical training. The computer system used was the IBM 1500 system. Five CAI modules were developed which could replace 92 hours of the class curriculum. CAI provided very effective and efficient instruction. CAI students scored higher than…

  7. An Information and Technical Manual for the Computer-Assisted Teacher Training System (CATTS).

    ERIC Educational Resources Information Center

    Semmel, Melvyn I.; And Others

    The manual presents technical information on the computer assisted teacher training system (CATTS) which aims at developing a versatile and economical computer based teacher training system with the capability of providing immediate analysis and feedback of data relevant to teacher pupil transactions in a classroom setting. The physical…

  8. Distance Learning Success--A Perspective from Socio-Technical Systems Theory

    ERIC Educational Resources Information Center

    Wang, Jianfeng; Solan, David; Ghods, Abe

    2010-01-01

    With widespread adoption of computer-based distance education as a mission-critical component of the institution's educational program, the need for evaluation has emerged. In this research, we aim to expand on the systems approach by offering a model for evaluation based on socio-technical systems theory addressing a stated need in the literature…

  9. Technical Assistance Model for Long-Term Systems Change: Three State Examples. Executive Summary

    ERIC Educational Resources Information Center

    Kasprzak, Christina; Goode, Sue; Hurth, Joicey; Lucas, Anne; Marshall, Jacqueline; Terrell, Adriane; Jones, Elizabeth

    2010-01-01

    The NECTAC Technical Assistance (TA) Model for Long-Term Systems Change (LTSC) recognizes that components of a state system are highly interactive and changes at one level are not likely to be sustained without supportive changes at all related levels. Improved child and family outcomes require: intervention practices that are research-based,…

  10. SYSTEMS FOR RAPID RANKING OF ENVIRONMENTAL POLLUTANTS: SELECTION OF SUBJECTS FOR SCIENTIFIC AND TECHNICAL ASSESSMENT REPORTS

    EPA Science Inventory

    This document reports the results of the development and testing of a system for rapidly ranking environmental pollutants. One potential use for the system is in choosing the most important candidates for Scientific and Technical Assessment Reports (STAR). Of several possible app...

  11. Accreditation System for Technical Education Programmes in India: A Critical Review

    ERIC Educational Resources Information Center

    Prasad, G.; Bhar, C.

    2010-01-01

    This paper gives an overview of the Indian technical education system with regard to both its quantitative and qualitative scenario and upholds the value of accreditation in quality improvement and quality assurance of educational programmes. The paper presents a comparison of accreditation systems being followed in some important countries,…

  12. Contingency Software in Autonomous Systems: Technical Level Briefing

    NASA Technical Reports Server (NTRS)

    Lutz, Robyn R.; Patterson-Hines, Ann

    2006-01-01

    Contingency management is essential to the robust operation of complex systems such as spacecraft and Unpiloted Aerial Vehicles (UAVs). Automatic contingency handling allows a faster response to unsafe scenarios with reduced human intervention on low-cost and extended missions. Results, applied to the Autonomous Rotorcraft Project and Mars Science Lab, pave the way to more resilient autonomous systems.

  13. The matching of biological and technical elements and systems

    NASA Technical Reports Server (NTRS)

    Zozulya, Y. I.

    1978-01-01

    The conditions necessary for matching the input-output relationships of nonlinear dynamic systems without memory and with image memory are discussed. A structural representation is provided for the input-output relationships of matched elements and systems with distributed kernels.

  14. Audio Card Systems. Technical Information Bulletin No. 13.

    ERIC Educational Resources Information Center

    Gasser, P.

    This examination of audio card systems for computers begins by identifying the three information processing systems for sound: sound digitizing, synthesis of text, and word recognition. Specific pedagogical applications of digitized sound are then briefly discussed. The remainder of the document focuses on specifications for the working of vocal…

  15. Succession Planning in a Two-Year Technical College System

    ERIC Educational Resources Information Center

    Neefe, Diane Osterhaus

    2009-01-01

    The study explores the organizational characteristics of strategic planning, succession planning and career management and the processes impact on the hiring location of academic leaders from within the college, external to the college but within the system, and external to the system. The study was conducted in the 16 college Wisconsin…

  16. Advanced thermal barrier coating system development: Technical progress report

    SciTech Connect

    1996-08-07

    Objectives are to provide an improved TBC system with increased temperature capability and improved reliability, for the Advanced Turbine Systems program (gas turbine). The base program consists of three phases: Phase I, program planning (complete); Phase II, development; and Phase III (selected specimen-bench test). Work is currently being performed in Phase II.

  17. Windjammer solar-water-heating system. Final technical report

    SciTech Connect

    Windham, J.R.

    1982-04-01

    The results of the Windjammer Solar-Water-Heating System tests showed that it was not as an efficient system as a comparable conventional system for converting solar energy into heat energy. However, it was determined that the innovative mode used less electric back-up energy for water heating. Reduced fossil fuel energy consumption being the ultimate objective of a solar water heating, the principle employed has been shown to be a workable energy saving concept. The differential mode of temperature control emerged as the more efficient mode of operation for the innovative system and under comparable conditions is projected to be nearly equivalent to the conventional solar system. Although the concept has proven workable, the costs feasible, and the potential for considereable improvements exists, additional research and development is needed to advance the design into its most practical application.

  18. 75 FR 45678 - Notice of Availability of Interim Staff Guidance Document for Fuel Cycle Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... On July 10, 2009, notice was given in the Federal Register (74 FR 33281) of the availability for... COMMISSION Notice of Availability of Interim Staff Guidance Document for Fuel Cycle Facilities AGENCY.... Powell, Nuclear Process Engineer, Technical Support Branch, Division of Fuel Cycle Safety and...

  19. 75 FR 5632 - Office of New Reactors; Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ...The NRC staff is soliciting public comment on its proposed Interim Staff Guidance (ISG) DC/COL-ISG-021 titled ``Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092640035). This ISG provides new guidance information for......

  20. Improved Controls for Fusion RF Systems. Final technical report

    SciTech Connect

    Casey, Jeffrey A.

    2011-11-08

    We have addressed the specific requirements for the integrated systems controlling an array of klystrons used for Lower Hybrid Current Drive (LHCD). The immediate goal for our design was to modernize the transmitter protection system (TPS) for LHCD on the Alcator C-Mod tokamak at the MIT Plasma Science and Fusion Center (MIT-PSFC). Working with the Alcator C-Mod team, we have upgraded the design of these controls to retrofit for improvements in performance and safety, as well as to facilitate the upcoming expansion from 12 to 16 klystrons. The longer range goals to generalize the designs in such a way that they will be of benefit to other programs within the international fusion effort was met by designing a system which was flexible enough to address all the MIT system requirements, and modular enough to adapt to a large variety of other requirements with minimal reconfiguration.

  1. Acquisition and sources. [documents for scientific and technical information systems

    NASA Technical Reports Server (NTRS)

    Eckert, P. F.

    1978-01-01

    Suggestions and ideas for acquiring documents or their surrogates for a planned or fledgling information system are offered. The problems of selectivity of documents or their surrogates, both in superabundant quantities, and duplicate checking are highlighted. Acquisitioning flow, a semiautomated duplicate search technique, and alerting methods for prospective documentation are described. Appendices include two category systems, selected definitions and acronyms, and a selected address list for document procurement.

  2. Advanced Instrumentation, Information, and Control Systems Technologies Technical Program Plan

    SciTech Connect

    Bruce Hallbert

    2012-09-01

    Reliable instrumentation, information, and control (II&C) systems technologies are essential to ensuring safe and efficient operation of the U.S. light water reactor (LWR) fleet. These technologies affect every aspect of nuclear power plant (NPP) and balance-of-plant operations. In 1997, the National Research Council conducted a study concerning the challenges involved in modernization of digital instrumentation and control systems in NPPs. Their findings identified the need for new II&C technology integration.

  3. Technical assessment of an oil-fired residential cogeneration system

    SciTech Connect

    McDonald, R.J.

    1993-01-01

    The definition of cogeneration, within the context of this project, is the simultaneous production of electricity and heat energy from a single machine. This report will present the results of an engineering analysis of the efficiency and energy-conservation potential associated with a unique residential oil-fired cogeneration system that provides both heat and electric power. The system operates whenever a thermostat signals a call for heat in the home, just as a conventional heating system. However, this system has the added benefit of cogenerating electricity whenever it is running to provide space heating comfort. The system is designed to burn No. 2 heating oil, which is consumed in an 11-horsepower, two cylinder, 56.75-cubic-inch, 1850-RPM diesel engine. This unit is the only pre-production prototype residential No. 2 oil-fired cogeneration system known to exist in the world. As such, it is considered a landmark development in the field of oil-heat technology.

  4. Health Recommender Systems: Concepts, Requirements, Technical Basics and Challenges

    PubMed Central

    Wiesner, Martin; Pfeifer, Daniel

    2014-01-01

    During the last decades huge amounts of data have been collected in clinical databases representing patients' health states (e.g., as laboratory results, treatment plans, medical reports). Hence, digital information available for patient-oriented decision making has increased drastically but is often scattered across different sites. As as solution, personal health record systems (PHRS) are meant to centralize an individual's health data and to allow access for the owner as well as for authorized health professionals. Yet, expert-oriented language, complex interrelations of medical facts and information overload in general pose major obstacles for patients to understand their own record and to draw adequate conclusions. In this context, recommender systems may supply patients with additional laymen-friendly information helping to better comprehend their health status as represented by their record. However, such systems must be adapted to cope with the specific requirements in the health domain in order to deliver highly relevant information for patients. They are referred to as health recommender systems (HRS). In this article we give an introduction to health recommender systems and explain why they are a useful enhancement to PHR solutions. Basic concepts and scenarios are discussed and a first implementation is presented. In addition, we outline an evaluation approach for such a system, which is supported by medical experts. The construction of a test collection for case-related recommendations is described. Finally, challenges and open issues are discussed. PMID:24595212

  5. Development of a polystyrene insulation system. Final technical progress report

    SciTech Connect

    Rupert, J.G.

    1984-09-20

    An adhesive coating system for loose fill polystyrene materials was developed as a product primarily for retrofit insulation of residential buildings that would neither shrink nor settle. Several problems with the coated system including flammability and shrinkage led us to consider an alternative system in which an expanded rock product called perlite was considered as an alternative to polystyrene. The primary problems with perlite are that it is very expensive and the coated structure is extremely brittle. A very attractive commercial market for retrofit insulation using either polystyrene beads or shredded polystyrene was identified. Specifically, it was demonstrated that commercial cement block buildings can be reinsulated by filling the cores of the cement blocks with a payback period of three years. With additional development, it appears that the payback period can be reduced to 2 years at present natural gas prices. The potential market for a commercial system of this kind was analyzed and determined to be on the order of ten billion dollars nationally. The estimated potential energy savings are on order of one quad. At this time, the system is being redesigned to handle commercial buildings which have areas on the order of several hundred thousand square feet. Test marketing of the present system is in progress.

  6. Human-system Interfaces to Automatic Systems: Review Guidance and Technical Basis

    SciTech Connect

    OHara, J.M.; Higgins, J.C.

    2010-01-31

    Automation has become ubiquitous in modern complex systems and commercial nuclear power plants are no exception. Beyond the control of plant functions and systems, automation is applied to a wide range of additional functions including monitoring and detection, situation assessment, response planning, response implementation, and interface management. Automation has become a 'team player' supporting plant personnel in nearly all aspects of plant operation. In light of the increasing use and importance of automation in new and future plants, guidance is needed to enable the NRC staff to conduct safety reviews of the human factors engineering (HFE) aspects of modern automation. The objective of the research described in this report was to develop guidance for reviewing the operator's interface with automation. We first developed a characterization of the important HFE aspects of automation based on how it is implemented in current systems. The characterization included five dimensions: Level of automation, function of automation, modes of automation, flexibility of allocation, and reliability of automation. Next, we reviewed literature pertaining to the effects of these aspects of automation on human performance and the design of human-system interfaces (HSIs) for automation. Then, we used the technical basis established by the literature to develop design review guidance. The guidance is divided into the following seven topics: Automation displays, interaction and control, automation modes, automation levels, adaptive automation, error tolerance and failure management, and HSI integration. In addition, we identified insights into the automaton design process, operator training, and operations.

  7. Advanced thermal barrier coating system development. Technical progress report

    SciTech Connect

    1996-10-04

    The objectives of the program are to provide an improved TBC system with increased temperature capability and improved reliability relative to current state of the art TBC systems. The development of such a coating system is essential to the ATS engine meeting its objectives. The base program consists of three phases: Phase 1: Program Planning--Complete; Phase 2: Development; Phase 3: Selected Specimen--Bench Test. Work is currently being performed in Phase 2 of the program. In Phase 2, process improvements will be married with new bond coat and ceramic materials systems to provide improvements over currently available TBC systems. Coating reliability will be further improved with the development of an improved lifing model and NDE techniques. This will be accomplished by conducting the following program tasks: II.1 Process Modeling; II.2 Bond Coat Development; II.3 Analytical Lifing Model; II.4 Process Development; II.5 NDE, Maintenance and Repair; II.6 New TBC Concepts. A brief summary of progress made in each of these 6 areas is given.

  8. Joint Polar Satellite System (JPSS) Common Ground System (CGS) Current Technical Performance Measures

    NASA Astrophysics Data System (ADS)

    Cochran, S.; Panas, M.; Jamilkowski, M. L.; Miller, S. W.

    2015-12-01

    ABSTRACT The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will replace the afternoon orbit component and ground processing system of the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA. The JPSS satellites will carry a suite of sensors designed to collect meteorological, oceanographic, climatological and geophysical observations of the Earth. The ground processing system for JPSS is known as the JPSS Common Ground System (JPSS CGS). Developed and maintained by Raytheon Intelligence, Information and Services (IIS), the CGS is a multi-mission enterprise system serving NOAA, NASA and their national and international partners. The CGS has demonstrated its scalability and flexibility to incorporate multiple missions efficiently and with minimal cost, schedule and risk, while strengthening global partnerships in weather and environmental monitoring. The CGS architecture is being upgraded to Block 2.0 in 2015 to "operationalize" S-NPP, leverage lessons learned to date in multi-mission support, take advantage of more reliable and efficient technologies, and satisfy new requirements and constraints in the continually evolving budgetary environment. To ensure the CGS meets these needs, we have developed 49 Technical Performance Measures (TPMs) across 10 categories, such as data latency, operational availability and scalability. This paper will provide an overview of the CGS Block 2.0 architecture, with particular focus on the 10 TPM categories listed above. We will provide updates on how we ensure the deployed architecture meets these TPMs to satisfy our multi-mission objectives with the deployment of Block 2.0.

  9. Technical review of the Laboratory Biosphere closed ecological system facility

    NASA Astrophysics Data System (ADS)

    Dempster, W. F.; Thillo, M. Van; Alling, A.; Allen, J. P.; Silverstone, S.; Nelson, M.

    2004-01-01

    Laboratory Biosphere is a 40 m 3 closed life system that commenced operation in May 2002. Light is from 12,000 W of high pressure sodium lamps over planting beds with 5.37 m 2 of soil. Water is 100% recycled by collecting condensate from the temperature and humidity control system and mixing with leachate collected from under the planting beds. Atmospheric leakage was estimated during the first closure experiment to be 0.5-1% per day in general plus about 1% for each usage of the airlock door. The first trial run of 94 days was with a soybean crop grown from seeds (May 17, 2002) to harvest (August 14, 2002) plus 5 days of post-harvest closure. The focus of this initial trial was system testing to confirm functionality and identify any necessary modifications or improvements. This paper describes the organizational and physical features of the Laboratory Biosphere.

  10. Nine-size system for chemical defense gloves. Technical report

    SciTech Connect

    Robinette, K.M.; Annis, J.F.

    1986-07-01

    The purpose of this effort was to meet the need for improved sizing of chemical defense gloves for Air Force men and women. A nine-size system was developed from available hand data. The development process and size values are presented in this report. Some summary statistics and regression equations are provided to aid investigators who may wish to make modifications. Although the anthropometric sizing system outlined in this report is statistically sound, it is experimental. The authors recommend that anthropometric fit-testing be conducted prior to full-scale glove production.

  11. Evaluation of the Serpentix Conveying System. Final technical report

    SciTech Connect

    Not Available

    1980-03-01

    The Serpentix Conveying System, a Peabody Coal Company underground continuous face haulage invention, was evaluated to determine its viability in room-and-pillar mining. The Serpentix is a mobile, flexible belt conveyor which is suspended from the mine roof. It was operated in the Illinois No. 6 Mine No. 1 at Marissa, Illinois and Mine No. 10 at pawnee, Illinois. Production rates in excess of 1100 raw tons per eight-hour shift were demonstrated. Conceptual designs were developed to suspend the Serpentix system from chocks for shortwall mining applications.

  12. Rhode Island School and District Accountability System Technical Bulletin

    ERIC Educational Resources Information Center

    Rhode Island Department of Elementary and Secondary Education, 2007

    2007-01-01

    On January 8, 2002, the federal Elementary and Secondary Education Act (ESEA) was reauthorized as the No Child Left Behind Act (NCLB). NCLB required states to establish a single accountability system that includes every school and district. Rhode Island proposed an accountability model incorporating NCLB requirements to the US Department of…

  13. Strategic Explanations for a Diagnostic Consultation System. Technical Report #8.

    ERIC Educational Resources Information Center

    Hasling, Diane Warner; And Others

    This paper examines the problem of automatic explanation of reasoning, or the ability of a program to discuss what it is doing in some understandable way, particularly as part of an expert system. An introduction presents a general framework in which to view explanation and reviews some of the research in this area. This is followed by a…

  14. Phosphorimager and PD densitometer imaging system network. Technical report

    SciTech Connect

    1995-05-01

    This document discusses the research projects undertaken as a result of the availability of the PhosphorImager and PD Densitometer Imaging System Network, at the University of Georgia`s Complex Carbohydrate Research Center. The benefit gained from the equipment is described for each project.

  15. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... bandwidth of an imaging system operating under the provisions of this section must be contained between 1990 MHz and 10,600 MHz. (b) Operation under the provisions of this section is limited to fixed... operating under the provisions of this section must be eligible for licensing under the......

  16. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... bandwidth of an imaging system operating under the provisions of this section must be contained between 1990 MHz and 10,600 MHz. (b) Operation under the provisions of this section is limited to fixed... operating under the provisions of this section must be eligible for licensing under the......

  17. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... bandwidth of an imaging system operating under the provisions of this section must be contained between 1990 MHz and 10,600 MHz. (b) Operation under the provisions of this section is limited to fixed... operating under the provisions of this section must be eligible for licensing under the......

  18. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... bandwidth of an imaging system operating under the provisions of this section must be contained between 1990 MHz and 10,600 MHz. (b) Operation under the provisions of this section is limited to fixed... operating under the provisions of this section must be eligible for licensing under the......

  19. Organizational and Systems Theory: An Integrated Review. Technical Report 595.

    ERIC Educational Resources Information Center

    Swezey, Robert W.; And Others

    A review of the theoretical and empirical literature was conducted to identify, in a systems framework, organizational processes and dimensions associated with effective functioning. Potential methodologies for use in controlled organizational experimentation were also explored. Literature was reviewed according to an empirically derived…

  20. Exploration into technical procedures for vertical integration. [information systems

    NASA Technical Reports Server (NTRS)

    Michel, R. J.; Maw, K. D.

    1979-01-01

    Issues in the design and use of a digital geographic information system incorporating landuse, zoning, hazard, LANDSAT, and other data are discussed. An eleven layer database was generated. Issues in spatial resolution, registration, grid versus polygonal structures, and comparison of photointerpreted landuse to LANDSAT land cover are examined.

  1. An Automated Circulation System for a Small Technical Library.

    ERIC Educational Resources Information Center

    Culnan, Mary J.

    The traditional manually-controlled circulation records of the Burroughs Corporation Library in Goleta, California, presented problems of inaccuracies, time time-consuming searches, and lack of use statistics. An automated system with the capacity to do file maintenance and statistical record-keeping was implemented on a Burroughts B1700 computer.…

  2. Environmental Hazards and Systems Schools. Technical Report No. 81.

    ERIC Educational Resources Information Center

    Dexter, Arthur

    The purpose of this study was to ascertain the feasibility of incorporating certain protective concepts into selected systems-constructed schools. These concepts were to be incorporated at a minimal cost increase, with minimal sacrifice of amenities, and with no detrimental effect on facility configuration. The environmental hazards taken into…

  3. State Budgeting for Higher Education: Information Systems and Technical Analyses.

    ERIC Educational Resources Information Center

    Purves, Ralph A.; Glenny, Lyman A.

    The extent to which state agencies are implementing information systems and analytical methods for budget review are examined. Focus is on 17 states: California, Colorado, Connecticut, Florida, Hawaii, Illinois, Kansas, Michigan, Mississippi, Nebraska, New York, Pennsylvania, Tennessee, Texas, Virginia, Washington, and Wisconsin. Trends in budget…

  4. Class 2: An Expert System for Student Classification. Technical Paper.

    ERIC Educational Resources Information Center

    Ferrara, Joseph M.; And Others

    The paper describes an approach to developing systematic procedures for identifying handicapped children that leads to rational decisions regarding placement. An expert system is described which involves the user in a dialogue on data regarding individual children; this dialogue is similar in many ways to a consultation with an expert. After…

  5. Expanded bicycling route system for Denver. Final technical report

    SciTech Connect

    Maltempo, M.M.

    1983-11-01

    This final report describes the results of a study of the potential energy savings associated with increased utilitarian bicycle transportation in the Denver metropolitan area. The project has included computer modeling of the carrying capacity of the present bicycle route system, future route systems, as well as outreach activities to convey the results to public officials and the general public. A key feature of the project has been a consideration of the benefits associated with an expanded bikeway system which includes ''bike boulevards''. Data from the west coast cities and other sources, have been used to generate quantitative estimates of the benefits associated with a Denver bikeway system which includes bike boulevards. The development of a network of bike boulevards in Denver should result in energy savings of about 20.2 million gallons of gasoline per year, as well as a 3.4% reduction in vehicular carbon monoxide emissions. These benefits are in addition to those accruing from current levels of bicycling.

  6. Burn site groundwater interim measures work plan.

    SciTech Connect

    Witt, Jonathan L.; Hall, Kevin A.

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  7. Regional-technical information network system by PC-based communication 'Kougi Net Niigata'

    NASA Astrophysics Data System (ADS)

    Tanaka, Koichi; Kitagawa, Yoichi; Hoshino, Kimiaki

    'Regional-technical information' database was constructed by Industrial research institute of Niigata prefecture. This is available for industries in our prefecture with our PC-based communication network system. And also, it provides communication measures called BBS and electronic mail service with which they can communicate each other. This system is considered to give three effects. First of all, they can get technical information required in regional industries that is not provided by commercial database at their office or factory speedy and correctly. Secondly, they can easily survey technical background of local industries they want to take into partnership in their extension of work. Thirdly, since it provides a place where they can exchange information each other, it promotes their development of new commercial products and partnership.

  8. OEXP exploration studies technical report. Volume 3: Special reports, studies, and indepth systems assessments

    NASA Technical Reports Server (NTRS)

    Roberts, Barney B.; Bland, Dan

    1988-01-01

    The Office of Exploration (OEXP) at NASA has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of manned exploration of the Solar System. The Mission analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report, produced by the MASE, describes the process used to conduct exploration studies and discusses the mission developed in a case study approach. The four case studies developed in FY88 include: (1) a manned expedition to PHOBOS; (2) a manned expedition to MARS; (3) a lunar surface observatory; and a lunar outpost to early Mars evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work.

  9. Satellite power system concept development and evaluation program. Volume 1: Technical assessment summary report

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Candidate satellite power system (SPS) concepts were identified and evaluated in terms of technical and cost factors. A number of alternative technically feasible approaches and system concepts were investigated. A reference system was defined to facilitate economic, environmental, and societal assessments by the Department of Energy. All elements of the reference system were defined including the satellite and all its subsystems, the orbital construction and maintenance bases, all elements of the space transportation system, the ground receiving station, and the associated industrial facilities for manufacturing the required hardware. The reference conclusions and remaining issues are stated for the following topical areas: system definition; energy conversion and power management; power transmission and reception; structures, controls, and materials; construction and operations; and space transportation.

  10. Final Technical Report "Multiscale Simulation Algorithms for Biochemical Systems"

    SciTech Connect

    Petzold, Linda R.

    2012-10-25

    Biochemical systems are inherently multiscale and stochastic. In microscopic systems formed by living cells, the small numbers of reactant molecules can result in dynamical behavior that is discrete and stochastic rather than continuous and deterministic. An analysis tool that respects these dynamical characteristics is the stochastic simulation algorithm (SSA, Gillespie, 1976), a numerical simulation procedure that is essentially exact for chemical systems that are spatially homogeneous or well stirred. Despite recent improvements, as a procedure that simulates every reaction event, the SSA is necessarily inefficient for most realistic problems. There are two main reasons for this, both arising from the multiscale nature of the underlying problem: (1) stiffness, i.e. the presence of multiple timescales, the fastest of which are stable; and (2) the need to include in the simulation both species that are present in relatively small quantities and should be modeled by a discrete stochastic process, and species that are present in larger quantities and are more efficiently modeled by a deterministic differential equation (or at some scale in between). This project has focused on the development of fast and adaptive algorithms, and the fun- damental theory upon which they must be based, for the multiscale simulation of biochemical systems. Areas addressed by this project include: (1) Theoretical and practical foundations for ac- celerated discrete stochastic simulation (tau-leaping); (2) Dealing with stiffness (fast reactions) in an efficient and well-justified manner in discrete stochastic simulation; (3) Development of adaptive multiscale algorithms for spatially homogeneous discrete stochastic simulation; (4) Development of high-performance SSA algorithms.

  11. Dangers of collapsible ventricular drainage systems. Technical note.

    PubMed

    Kaye, A H; Wallace, D

    1982-02-01

    Ventricular drainage systems employing a collapsible plastic bag for fluid collection were postulated to cause an increasing back-pressure produced in part by the elasticity of the bag. This postulate was shown to be correct in an experimental situation. There was a logarithmic rise in cerebrospinal fluid pressure as the bag filled. By increasing the size of the bag, the problem was overcome. PMID:7054446

  12. Phased-array ultrasonic surface contour mapping system. Technical note

    SciTech Connect

    Fasching, G.E.; Loudin, W.J.; Paton, D.E.; Smith, N.S. Jr.

    1992-11-01

    The development of reliable mechanistic models for prediction of conventional and fluidized-bed combustor and gasifier operation and solids flow behavior in silos or other solids handling and storage components requires knowledge of the contained solids flow characteristics. This knowledge is gained from dynamic experimental measurements of bed top surface contours in addition to measurements of bulk bed properties. The surface contour mapping system (SCMS) provides a means of generating surface contour maps in real time with a unique, automatically focused, density-compensated, digital phased-array scanning, ultrasonic-range measurement system. The system is designed to operate in environments having gas temperatures up to 1,600 {degree}F and pressures to 1,000 psig. Computer simulation of several SCMS candidates and acoustic carrier modulation techniques indicates that a surface measurement resolution of {plus_minus}2 inches over a range of 5 to 20 feet distance between the transmit/receive (T/R) transducers and the bed surface can be expected. The simulation of a particular design, a 9-T/R, 25-pixel bed surface, in which the level of each pixel was randomly set between 5 and 7 feet below the plane of the T/R transducers, then measured using two different modulation techniques, produced excellent results. The simulation of this surface contour mapping system determined the value of the level of each of the 25 pixels to within {plus_minus}1 inch for over 95 percent of more than 100 test cases for one of the modulation techniques, and for over 99 percent of about 100 test cases for a second modulation technique. A hardware implementation of the design simulated but using only a two-T/R, three-pixel SCMS produced results very closely approximating those obtained during the simulation.

  13. A socio-technical model to explore urban water systems scenarios.

    PubMed

    de Haan, Fjalar J; Ferguson, Briony C; Deletic, Ana; Brown, Rebekah R

    2013-01-01

    This article reports on the ongoing work and research involved in the development of a socio-technical model of urban water systems. Socio-technical means the model is not so much concerned with the technical or biophysical aspects of urban water systems, but rather with the social and institutional implications of the urban water infrastructure and vice versa. A socio-technical model, in the view purported in this article, produces scenarios of different urban water servicing solutions gaining or losing influence in meeting water-related societal needs, like potable water, drainage, environmental health and amenity. The urban water system is parameterised with vectors of the relative influence of each servicing solution. The model is a software implementation of the Multi-Pattern Approach, a theory on societal systems, like urban water systems, and how these develop and go through transitions under various internal and external conditions. Acknowledging that social dynamics comes with severe and non-reducible uncertainties, the model is set up to be exploratory, meaning that for any initial condition several possible future scenarios are produced. This article gives a concise overview of the necessary theoretical background, the model architecture and some initial test results using a drainage example. PMID:23925202

  14. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false System technical integration requiring uniform... Notices § 76.1608 System technical integration requiring uniform election of must-carry or retransmission... days prior to integration, the cable system may require the station to make such a uniform election...

  15. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false System technical integration requiring uniform... Notices § 76.1608 System technical integration requiring uniform election of must-carry or retransmission... days prior to integration, the cable system may require the station to make such a uniform election...

  16. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false System technical integration requiring uniform... Notices § 76.1608 System technical integration requiring uniform election of must-carry or retransmission... days prior to integration, the cable system may require the station to make such a uniform election...

  17. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false System technical integration requiring uniform... Notices § 76.1608 System technical integration requiring uniform election of must-carry or retransmission... days prior to integration, the cable system may require the station to make such a uniform election...

  18. An Interim Accounting.

    ERIC Educational Resources Information Center

    Marland, S. P., Jr.

    The new approach to educational renewal in the Office of Education involves the key element of concentration. Instead of giving piecemeal grants, all discretionary funds within OE have been concentrated in one division in order to assist a limited number of school systems to install totally new programs involving all aspects of the school. Each…

  19. Solar heating and cooling technical data and systems analysis

    NASA Technical Reports Server (NTRS)

    Christensen, D. L.

    1976-01-01

    The accomplishments of a project to study solar heating and air conditioning are outlined. Presentation materials (data packages, slides, charts, and visual aids) were developed. Bibliographies and source materials on materials and coatings, solar water heaters, systems analysis computer models, solar collectors and solar projects were developed. Detailed MIRADS computer formats for primary data parameters were developed and updated. The following data were included: climatic, architectural, topography, heating and cooling equipment, thermal loads, and economics. Data sources in each of these areas were identified as well as solar radiation data stations and instruments.

  20. TAPAS: Topographic air pollution analysis system. Technical note

    SciTech Connect

    Riebau, A.; Fox, D.A.; Marlatt, W.E.

    1987-05-01

    This report presents information on the Topographic Air Pollution Analysis System (TAPAS), currentlu under development by the Bureau of Land Management, U.S. Forest Service, and Colorado State University. TAPAS is designed to provide resource managers with air quality dispersion modeling tools to accomplish more efficient and economical air resource studies. TAPAS consists of a group of interactive air quality computer models that can be operated independently, or in combination for more detailed applications. TAPAS applications include support for resource management plans, environmental impact statements, siting of remote automatic weather stations, PSD permit evaluations, and smoke management for prescribed burns.

  1. National INFOSEC technical baseline: multi-level secure systems

    SciTech Connect

    Anderson, J P

    1998-09-28

    The purpose of this report is to provide a baseline description of the state of multilevel processor/processing to the INFOSEC Research Council and at their discretion to the R&D community at large. From the information in the report, it is hoped that the members of the IRC will be aware of gaps in MLS research. A primary purpose is to bring IRC and the research community members up to date on what is happening in the MLS arena. The review will attempt to cover what MLS products are still available, and to identify companies who still offer MLS products. We have also attempted to identify requirements for MLS by interviewing senior officers of the Intelligence community as well as those elements of DoD and DOE who are or may be interested in procuring MLS products for various applications. The balance of the report consists of the following sections; a background review of the highlights of the developments of MLS, a quick summary of where we are today in terms of products, installations, and companies who are still in the business of supplying MLS systems [or who are developing MLS system], the requirements as expressed by senior members of the Intelligence community and DoD and DOE, issues and unmet R&D challenges surrounding MLS, and finally a set of recommended research topics.

  2. Instrumentation of Dynamic Gas Pulse Loading system. Final technical report

    SciTech Connect

    Mohaupt, H.

    1993-07-31

    The Dynamic Gas Pulse Loading (DGPL) process is an hydraulic fracturing method which uses CO{sub 2} and CO gas as a working fluid instead of a liquid. The DGPL system can be used to generate fractures for horizontal and vertical oil and gas well completions in both open hole and perforated casing. The DGPL system provides a cost effective tool for repairing near well bore permeability damage caused by inappropriate chemical treatment, migrating fines and paraffins, or slotted liners blocked by sand. Because the gas is generated from a solid propellant material by chemical reaction, no heavy equipment is required. Tremendous pump rates can be obtained. Peak pressures are naturally localized at the tool position by the tamping effect of well fluids. Thus many of the leakage and sealing problems which plague static hydrofrac processes ore completely avoided. DGPL may be effectively used before acid treatment to provide fresh pathways for the acid to reach the formation. The smaller tools may be positioned by wireline, though most Stressfrac tools are tubing conveyed.

  3. IGT/DOE coal-conversion systems technical data book

    SciTech Connect

    Talwalkar, A.T.

    1981-11-01

    This project was initiated by OCR to meet the needs of the emerging synthetic fuels industry and as a mechanism to conserve and make available to the public the results of large government R and D expenditures for synthetic fuels. The objective of the Data Book project is to provide a single, comprehensive source of data on coal conversion systems. These include coal gasification, coal liquefaction, fluidized-bed combustion, and coal-based MHD. It was decided that design procedures, as well as numerical data, will be included in the Data Book. The Data Book is expected to provide up-to-date data and information for research, process development, process design, engineering, construction, and operation of coal conversion processes and/or plants. Concurrently, the program is also to identify areas where data are lacking and suggest research programs to provide the required data. The data are collected from reports by DOE contractors, published literature, ad unpublished sources for critical evaluation. Literature search is carried out through various abstracts and indexes and computerized information retrieval systems. The contents of the Data Book are currently organized in ten major sections.

  4. MITT writer and MITT writer advanced development: Developing authoring and training systems for complex technical domains

    NASA Technical Reports Server (NTRS)

    Wiederholt, Bradley J.; Browning, Elica J.; Norton, Jeffrey E.; Johnson, William B.

    1991-01-01

    MITT Writer is a software system for developing computer based training for complex technical domains. A training system produced by MITT Writer allows a student to learn and practice troubleshooting and diagnostic skills. The MITT (Microcomputer Intelligence for Technical Training) architecture is a reasonable approach to simulation based diagnostic training. MITT delivers training on available computing equipment, delivers challenging training and simulation scenarios, and has economical development and maintenance costs. A 15 month effort was undertaken in which the MITT Writer system was developed. A workshop was also conducted to train instructors in how to use MITT Writer. Earlier versions were used to develop an Intelligent Tutoring System for troubleshooting the Minuteman Missile Message Processing System.

  5. Nonlinear dynamics of fluid-structure systems. Annual technical report

    SciTech Connect

    Moon, F.C.; Muntean, G.

    1994-01-01

    We are investigating the nonlinear dynamics of a row of cylindrical tubes excited by the cross flow of fluid. Both experimental and analytical/numerical studies have been conducted. The goal of this research is to look for low dimensional dynamic models in flow- induced vibrations using modern methods of dynamical systems and chaos theory. The experimental study uses a 25 cm {times} 25 cm wind tunnel with flow velocity in the range of 15 m/sec. The use of a wind tunnel to explore dynamic phenomenon compliments the work of Chen at Argonne National Laboratory who also is conducting experiments with a water tunnel. The principal nonlinearities studies are impact constraints due to gaps in the cylinder supports and nonlinear fluid forces.

  6. Technical and Economic Evaluation of Advanced Air Cargo Systems

    NASA Technical Reports Server (NTRS)

    Whitehead, A. H., Jr.

    1978-01-01

    The current air cargo environment and the relevance of advanced technology aircraft in enhancing the efficiency of the 1990 air cargo system are discussed. NASA preliminary design studies are shown to indicate significant potential gains in aircraft efficiency and operational economics for future freighter concepts. Required research and technology elements are outlined to develop a better base for evaluating advanced design concepts. Current studies of the market operation are reviewed which will develop design criteria for a future dedicated cargo transport. Design features desirable in an all-freighter design are reviewed. NASA-sponsored studies of large, distributed-load freighters are reviewed and these designs are compared to current wide-body aircraft. These concepts vary in gross takeoff weight from 0.5 Gg (one million lbs.) to 1.5 Gg (three million lbs.) and are found to exhibit economic advantages over conventional design concepts.

  7. Technical and economic assessment of tethered wind energy systems

    SciTech Connect

    Furuya, O.; Maekawa, S.

    1984-08-01

    The wind energy existing at high altitude has been investigated as a potential energy resource in the United States. In terms of the average power density, it can be as high as 16 KW/m/sup 2/ at northeastern U.S. sites such as New York, which can be compared to 0.5 KW/m/sup 2/, the maximum ground level value at the U.S. sites. For a lifting generation device, a VTOL concept, new to this type of TWES, which combines the fixed wing with helicopter technology was extensively studied. The cost of electricity (COE) with such a system was determined and found to be competitive to that of fossil fuel in the near future.

  8. Eckerd College Energy Systems Project. Final technical report

    SciTech Connect

    DeGroot, D.E.

    1984-02-06

    The Eckerd College Energy Systems Project (ESP) consisted of four interrelated components: Organic gardening; Aquaculture (Tilapia); Methane gas conversion and utilization as energy source to drive an electric generator; Solar water heating component. These components were designed to demonstrate the feasibility of using alternative technologies to reduce petro-chemical energy dependency, to provide faculty and staff with hands-on A.T. experience, and to involve the general community in A.T. energy experiences. The Organic, Aquaculture and Solar components were successful. The Methane project was not. The educational goals of the project were met or exceeded. It is strongly recommended that DOE/AT support ESP like programs at all educational levels as part of our national commitment to developing an increasing capability for energy self sufficiency in the general population.

  9. Photovoltaic power systems patents: a technical and economic analysis

    SciTech Connect

    Not Available

    1981-01-01

    One hundred recent patents (most of them granted within the last 12 months) dealing with photovoltaic systems and devices are analyzed in an attempt to provide to inventors and to management of companies in the industry an answer to the question, which companies and which technologies will capture the future market. Each invention has been evaluated to determine its status in terms of implementation and licensing availability. A long-term model of the industry has been developed; and within than framework, the role of each invention and how each will fare in competition with other inventions has been accessed. Areas for the inventions are pointed out. The patents are listed by companies, inventors, and categories. (BLM)

  10. Technical manual: description and operation Slaved Tracking System

    SciTech Connect

    Bauhs, K.C.

    1984-08-01

    This manual contains physical and functional descriptions, operating procedures, and safety precautions for the Slaved Tracking System (STS). The STS is a mobile unit designed to provide close-up, high-quality motion pictures and video tapes of laydown bombs and rockets during the final phase of their trajectory to impact point. Radiometer devices mounted with the optics can also be used to track rocket exhaust emissions. The STS receives binary range and encoder information from Sandia's Laser Tracker System (LTS) to provide the STS with steering signals to track vehicle. These signals are transmitted by microwave or hard-wire communications lines. The communications link is shown in Figure 1-1. The STS yields optimum photographic coverage with a field-of-view of +-5 ft on targets traveling up to 2000 f/s at a cross range of 1500 ft. The boresight of the fixed optics points directly at a 12-in. gimballed tracking mirror that provides satisfactory photographic lighting under most conditions. A 75-mm-square flat-plate beamsplitter is used on the optical table to divide the gimbal mirror view between a 500-frame-per-second (FPS) motion picture camera and a shuttered, color, 60-field-per-second (fps) television camera. A video cassette recorder provides for immediate posttest analysis. The gimbal mirror and optical table are mounted on a steel pedestal weighing approx. 2 tons for maximum stability. The pedestal is leveled with three motor-driven screw jacks with lifting speed resolution of 0.002 to 0.05 in.-per-second.

  11. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Technical Requirements for Class A Automatic Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Equipment Authorization for Compulsory Ships §...

  12. System installation package for the New Hampshire Vocational Technical College, Manchester, N. H.

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A system installed in the residential solar laboratory located at the New Hampshire Vocational Technical College in Manchester, N. H. is described. General guidelines which may be utilized in development of detailed installation plans and specifications, as well as instructions on operation and maintenance are provided.

  13. Optimization of technical and social systems: A goal of organizational change

    SciTech Connect

    Kowalewski, M.J. Jr.; Farrar, C.R.

    1993-01-01

    What light does Behavioral Science and Organization Development shed on Total Quality Management (TQM) in Earth`s global environment? In 1968 Eric Trist, a well-known Social Psychologist, described TQM before it was an abbreviation. He concluded that (TQM) is ``{hor_ellipsis} a joint optimization of the technical and social systems as a goal of organizational change.`` The social and technical systems of Europe have been joined together in the European community 1992 (EC `92) coalition. As part of EC `92 the International organization of Standardization (ISO) has provided the technical standardization system for inter-country approval and use. Other non-European countries have joined the ISO movement including the United States of America. Change has been a result of this movement. Most of it has been on technical, quality, and management systems. The next century will require and reveal changes in behavioral thinking and organizational structure. TQM is at the frontier of this change. A case-study of change resulting from TQM in government is presented in this paper.

  14. Optimization of technical and social systems: A goal of organizational change

    SciTech Connect

    Kowalewski, M.J. Jr. . Rocky Flats Plant); Farrar, C.R. )

    1993-01-01

    What light does Behavioral Science and Organization Development shed on Total Quality Management (TQM) in Earth's global environment In 1968 Eric Trist, a well-known Social Psychologist, described TQM before it was an abbreviation. He concluded that (TQM) is [hor ellipsis] a joint optimization of the technical and social systems as a goal of organizational change.'' The social and technical systems of Europe have been joined together in the European community 1992 (EC '92) coalition. As part of EC '92 the International organization of Standardization (ISO) has provided the technical standardization system for inter-country approval and use. Other non-European countries have joined the ISO movement including the United States of America. Change has been a result of this movement. Most of it has been on technical, quality, and management systems. The next century will require and reveal changes in behavioral thinking and organizational structure. TQM is at the frontier of this change. A case-study of change resulting from TQM in government is presented in this paper.

  15. HIGHLIGHTS FROM TECHNICAL MANUAL ON HOOD SYSTEM CAPTURE OF PROCESS FUGITIVE PARTICULATE EMISSIONS

    EPA Science Inventory

    The paper discusses a technical manual whose emphasis is on the design and evaluation of actual hood systems used to control various fugitive particulate emission sources. Engineering analyses of the most important hood types are presented to provide a conceptual understanding of...

  16. 75 FR 59261 - Mandatory Reliability Standards for the Bulk Power System; Supplemental Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mandatory Reliability Standards for the Bulk Power System; Supplemental Notice of Technical Conference September 17, 2010. On August 19, 2010 the Federal Energy Regulatory Commission announced that a...

  17. 77 FR 21766 - Midwest Independent Transmission System Operator, Inc.; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Midwest Independent Transmission System Operator, Inc.; Notice of Technical Conference By order dated March 30, 2012, in Docket Nos. ER12-678-000 and ER12-679-000, the Federal Energy Regulatory Commission...

  18. ALOHA System Technical Reports 16, 19, 24, 28, and 30, 1974.

    ERIC Educational Resources Information Center

    Hawaii Univ., Honolulu. ALOHA System.

    A series of technical reports based on the Aloha System for educational computer programs provide a background on how various countries in the Pacific region developed computer capabilities and describe their current operations, as well as prospects for future expansion. Included are studies on the Japan-Hawaii TELEX and Satellite; computers at…

  19. Promoting Teachers' Learning and Knowledge Building in a Socio-Technical System

    ERIC Educational Resources Information Center

    Tammets, Kairit; Pata, Kai; Laanpere, Mart

    2013-01-01

    The study proposes a way in which the learning and knowledge building (LKB) framework, which is consistent with the knowledge conversion phases proposed by Nonaka and Takeuchi, supports teachers' informal and self-directed workplace learning. An LKB framework in a socio-technical system was developed to support professional development in an…

  20. Development of a Technical Data File On the Design and Use of Instructional Systems.

    ERIC Educational Resources Information Center

    Schumacher, Sanford P.

    A technical data file concerned with the technology of Instructional System Development suitable for a variety of users was developed. The file was prepared in a way amenable to later computerized storage and retrieval. General information sources and indexes of highly probable relevance were reviewed with key words and relevant specialty journals…

  1. RADON REDUCTION TECHNIQUES FOR EXISTING DETACHED HOUSES - TECHNICAL GUIDANCE (THIRD EDITION) FOR ACTIVE SOIL DEPRESSURIZATION SYSTEMS

    EPA Science Inventory

    This technical guidance document is designed to aid in the selection, design, installation and operation of indoor radon reduction techniques using soil depressurization in existing houses. Its emphasis is on active soil depressurization; i.e., on systems that use a fan to depre...

  2. Technical Communications in OSS Content Management Systems: An Academic Institutional Case Study

    ERIC Educational Resources Information Center

    Cripps, Michael J.

    2011-01-01

    Single sourcing through a content management system (CMS) is altering technical communication practices in many organizations, including institutions of higher education. Open source software (OSS) solutions are currently among the most popular content management platforms adopted by colleges and universities in the United States and abroad. The…

  3. Appendix 1.1 Tables. Continuation Education System Development Project. Technical Report.

    ERIC Educational Resources Information Center

    East, Leon; Jensen, J. Alan

    The Continuation Education System Development Project technical report of appendix tables includes: (1) a bibliography; (2) letters to schools; (3) the initial in-service training program of Valley staff; (4) data of a teacher evaluation survey; (5) instructional preference scale data; (6) meaning of words inventory data; (7) a physical profile;…

  4. Chapter 1 Evaluation & Reporting System, 1989 Update. Technical Report No. 9013.

    ERIC Educational Resources Information Center

    Davidoff, Stephen H.

    This technical report updates the Chapter 1 Evaluation and Reporting System (CHIERS) used by the Philadelphia (Pennsylvania) School District to gather and report student information related to compensatory education programs funded under Chapter 1 of the Education Consolidation and Improvement Act of 1981, with information about 1988-89 projects.…

  5. The Kentucky Community and Technical College System Learn on Demand Model

    ERIC Educational Resources Information Center

    McCall, Michael B.

    2013-01-01

    When colleges turned to online learning, they opened the door for a number of students who might have only dreamed of pursuing a degree or credential. In 2006, the Kentucky Community and Technical College System (KCTCS) surveyed prospective adult students without a college degree and discovered that they were three times more likely to enroll in…

  6. The NASA scientific and technical information system: Its scope and coverage

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A general description of the subject areas covered in the NASA scientific and technical information system is presented. In addition, it establishes subject-based selection criteria for guiding decisions related to the addition of new documents to the NASA collection.

  7. 78 FR 24061 - Minimum Technical Standards for Class II Gaming Systems and Equipment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... ensuring the integrity of electronic Class II games and aids. 73 FR 60508, Oct. 10, 2008. The technical... Class II gaming system; and to clarify the term ``alternate standard.'' 77 FR 58473, Sept. 21, 2012. In... control standards (MICS) for Class II gaming. 77 FR 58708, Sept. 21, 2012. Similar to the part...

  8. A Comparative Evaluation of the Technical Performance and User Acceptance of Two Prototype Online Catalog Systems.

    ERIC Educational Resources Information Center

    Siegel, Elliot R.; And Others

    1984-01-01

    Describes research strategy and methods of comparative evaluation conducted by the National Library of Medicine to assess user acceptance and technical performance of two prototype patron accessible online catalog systems within same operational environment. User acceptance studies included sample search experiment, comparison search experiment,…

  9. AGR-1 Data Qualification Interim Report

    SciTech Connect

    Machael Abbott

    2009-08-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010.

  10. Technical features of a low-cost Earthquake Alert System

    SciTech Connect

    Harben, P.

    1991-08-01

    The concept and features of an Earthquake Alert System (EAS) involving a distributed network of strong motion sensors is discussed. The EAS analyzes real-time data telemetered to a central facility and issues an areawide warning of a large earthquake in advance of the spreading elastic wave energy. A low-cost solution to high-cost estimates for installation and maintenance of a dedicated EAS is presented that makes use of existing microseismic stations. Using the San Francisco Bay area as an example, we show that existing US Geological Survey microseismic monitoring stations are of sufficient density to form the elements of a prototype EAS. By installing strong motion instrumentation and a specially developed switching device, strong ground motion can be telemetered in real-time to the central microseismic station on the existing communication channels. When a large earthquake occurs, a dedicated real-time central processing unit at the central microseismic station digitizes and analyses the incoming data and issues a warning containing location and magnitude estimations. A 50-station EAS of this type in the San Francisco Bay area should cost under $70,000 to install and less than $5000 annually to maintain.

  11. Technical quality assessment of an optoelectronic system for movement analysis

    NASA Astrophysics Data System (ADS)

    Di Marco, R.; Rossi, S.; Patanè, F.; Cappa, P.

    2015-02-01

    The Optoelectronic Systems (OS) are largely used in gait analysis to evaluate the motor performances of healthy subjects and patients. The accuracy of marker trajectories reconstruction depends on several aspects: the number of cameras, the dimension and position of the calibration volume, and the chosen calibration procedure. In this paper we propose a methodology to evaluate the effects of the mentioned sources of error on the reconstruction of marker trajectories. The novel contribution of the present work consists in the dimension of the tested calibration volumes, which is comparable with the ones normally used in gait analysis; in addition, to simulate trajectories during clinical gait analysis, we provide non-default paths for markers as inputs. Several calibration procedures are implemented and the same trial is processed with each calibration file, also considering different cameras configurations. The RMSEs between the measured trajectories and the optimal ones are calculated for each comparison. To investigate the significant differences between the computed indices, an ANOVA analysis is implemented. The RMSE is sensible to the variations of the considered calibration volume and the camera configurations and it is always inferior to 43 mm.

  12. Rooftop PV system. Final technical progress report, Phase II

    SciTech Connect

    1995-08-01

    Under this four-year PV:BONUS Program, ECD and United Solar are developing and demonstrating two new lightweight flexible building integrated Photovoltaic (BIPV) modules specifically designed as exact replacements for conventional asphalt shingles and standing seam metal roofing. These modules can be economically and aesthetically integrated into new residential and commercial buildings, and address the even larger roofing replacement market. The modules are designed to be installed by roofing contractors without special training which minimizes the installation and balance of system costs. The modules will be fabricated from high-efficiency, multiple-junction a-Si alloy solar cells developed by ECD and United Solar. Under the Phase I Program, which ended in March 1994, we developed two different concept designs for rooftop PV modules: (1) the United Solar overlapping (asphalt shingle replacement) shingle-type modules and (2) the ECD metal roof-type modules. We also developed a plan for fabricating, testing and demonstrating these modules. Candidate demonstration sites for our rooftop PV modules were identified and preliminary engineering designs for these demonstrations were developed; a marketing study plan was also developed. The major objectives of the Phase II Program, which started in June 1994 was (1) to develop, test, and qualify these new rooftop modules; (2) to develop mechanical and electrical engineering specifications for the demonstration projects; and (3) to develop a marketing/commercialization plan.

  13. Interface between object-oriented systems. Technical report

    SciTech Connect

    Crowl, L.A.

    1987-04-01

    The Chrysalis operating system for the Butterfly Parallel Processor presents an object-oriented programming environment based on shared memory. However, because of Chrysalis's low-level orientation and its use of type-unsafe features of the C programming language, programs using the environment are difficult to program and highly error-prone. Using C as the primary programming language for the Butterfly does not fully realize the benefit of Chrysalis's object orientation. An object-oriented programming language is natural candidate for improving the Chrysalis environment. The C ++ programming language provides a number of advantages in developing such an interface. This paper reports the successes and problems encountered in the development of Chrysalis ++, a C ++ interface to Chrysalis ++ uncovered many strengths and weakness in C ++. Some apply to C ++ in general, others apply only to its adaptation to a parallel programming environment. It is important to note that C++ is a sequential language; it is use in a parallel programming environment is therefore outside the bounds of its design.

  14. State energy price system. Volume I: overview and technical documentation

    SciTech Connect

    Fang, J.M.; Nieves, L.A.; Sherman, K.L.; Hood, L.J.

    1982-06-01

    This study utilizes existing data sources and previous analyses of state-level energy prices to develop consistent state-level energy prices series by fuel type and by end-use sector. The fuels are electricity, natural gas, coal, distillate fuel oil, motor gasoline, diesel, kerosene, jet fuel, residual fuel, and liquefied petroleum gas. The end-use sectors are residential, commercial, industrial, transportation, and electric utility. Based upon an evaluation of existing data sources, recommendations were formulated on the feasible approaches for developing a consistent state energy price series. The data series were compiled based upon the approaches approved after a formal EIA review. Detailed documentation was provided, including annual updating procedures. Recommendations were formulated for future improvements in the collection of data or in data processing. Generally, the geographical coverage includes the 50 states and the District of Columbia. Information on state-level energy use was generally taken from the State Energy Data System (SEDS). Corresponding average US prices are also developed using volumes reported in SEDS. To the extent possible, the prices developed are quantity weighted average retail prices. Both a Btu price series and a physical unit price series are developed for each fuel. The period covered by the data series is 1970 through 1980 for most fuels, though prices for electricity and natural gas extend back to 1960. (PSB)

  15. Technical review of Westinghouse`s Advanced Turbine Systems Program

    SciTech Connect

    Diakunchak, I.S.; Bannister, R.L.

    1995-10-01

    U.S. Department of Energy, Office of Fossil Energy Advanced Turbine Systems (ATS) Program is an ambitious program to develop the necessary technologies, which will result in a significant increase in natural gas-fired power generation plant efficiency, a decrease in cost of electricity and a decrease in harmful emissions. In Phase 1 of the ATS Program, preliminary investigations on different gas turbine cycles demonstrated that net plant efficiency greater than 60% could be achieved. The more promising cycles were evaluated in more detail in Phase 2 in order to select the one that would achieve all of the program goals. The closed-loop cooled combined cycle was selected because it offered the best solution with the least risk for exceeding the ATS Program goals of net plant efficiency, emissions, cost of electricity, reliability, availability, and maintainability (RAM), and commercialization in the year 2000. The Westinghouse ATS plant is based on an advanced gas turbine design combined with an advanced steam. turbine and a high efficiency generator. To enhance achievement of the challenging performance, emissions, and RAM goals, current technologies are being extended and new technologies developed. The attainment of ATS performance goal necessitates advancements in aerodynamics, sealing, cooling, coatings, and materials technologies. To reduce emissions to the required levels, demands a development effort in the following combustion technology areas: premixed ultra low NOx combustion, catalytic combustion, combustion instabilities, and optical diagnostics. To achieve the RAM targets, requires the utilization of proven design features, with quantified risk analysis, and advanced materials, coatings, and cooling technologies. Phase 2 research and development projects currently in progress, as well as those planned for Phase 3, will result in advances in gas turbine technology and greatly contribute to ATS Program success.

  16. [Role and integration of technical prevention figures in the management system].

    PubMed

    Bartolucci, G B; Santantonio, P; Casciani, M; Dagazzini, I

    2010-01-01

    The multifarious issues of health and safety at work require multi-disciplinary skills, both in the risk assessment and in the subsequent definition and management of preventive measures, and this requires a renewed operational protocol that supports integration and co-operation between the technical prevention figures. Thus, between occupational physicians and technical advisers there should be a concrete and fruitful interaction, which should not be episodic or occasional, but a modus operandi systematic and constant. In this contribution is discussed as the technical prevention figures should be included in the Health and Safety Management System and should make a specific contribution in defining corporate policies on prevention. In particular it is outlined the role that the occupational physician may play in the development of prevention and health promotion activities within the strategies of corporate social responsibility. PMID:21086691

  17. B Plant interim safety basis

    SciTech Connect

    Chalk, S.E.

    1996-09-01

    This interim safety basis (ISB-008) replaces the B Plant Safety Analysis Report, WHC-SD-WM-SAR-013, Rev. 2 (WHC 1993a). ISB-008 uses existing accident analyses, modified existing accident analyses, and new accident analyses to prove that B Plant remains within the safety envelope for transition, deactivation, standby, and shutdown activities. The analyses in ISB-008 are in accordance with the most current requirements for analytical approach, risk determination, and configuration management. This document and supporting accident analyses replace previous design-basis documents.

  18. Fusion Breeder Program interim report

    SciTech Connect

    Moir, R.; Lee, J.D.; Neef, W.

    1982-06-11

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83.

  19. [Advanced Gas Turbine Systems Research]. Technical Quarterly Progress Report

    SciTech Connect

    1998-09-30

    Major Accomplishments by Advanced Gas Turbine Systems Research (AGTSR) during this reporting period are highlighted below and amplified in later sections of this report: AGTSR distributed 50 proposals from the 98RFP to the IRB for review, evaluation and rank-ordering during the summer; AGTSR conducted a detailed program review at DOE-FETC on July 24; AGTSR organized the 1998 IRB proposal review meeting at SCIES on September 15-16; AGTSR consolidated all the IRB proposal scores and rank-orderings to facilitate the 98RFP proposal deliberations; AGTSR submitted meeting minutes and proposal short-list recommendation to the IRB and DOE for the 98RFP solicitation; AGTSR reviewed two gas turbine related proposals as part of the CU RFP State Project for renovating the central energy facility; AGTSR reviewed and cleared research papers with the IRB from the University of Pittsburgh, Wisconsin, and Minnesota; AGTSR assisted GTA in obtaining university stakeholder support of the ATS program from California, Pennsylvania, and Colorado; AGTSR assisted GTA in distributing alert notices on potential ATS budget cuts to over 150 AGTSR performing university members; AGTSR submitted proceedings booklet and organizational information pertaining to the OAI hybrid gas turbine workshop to DOE-FETC; For DOE-FETC, AGTSR updated the university consortium poster to include new members and research highlights; For DOE-FETC, the general AGTSR Fact Sheet was updated to include new awards, workshops, educational activity and select accomplishments from the research projects; For DOE-FETC, AGTSR prepared three fact sheets highlighting university research supported in combustion, aero-heat transfer, and materials; For DOE-FETC, AGTSR submitted pictures on materials research for inclusion in the ATS technology brochure; For DOE-FETC, AGTSR submitted a post-2000 roadmap showing potential technology paths AGTSR could pursue in the next decade; AGTSR distributed the ninth newsletter UPDATE to DOE, the

  20. 105-H Reactor Interim Safe Storage Project Final Report

    SciTech Connect

    E.G. Ison

    2008-11-08

    The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D&D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

  1. Interim reliability evaluation program, Browns Ferry fault trees

    SciTech Connect

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible.

  2. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  3. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  4. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... section. (c) Principles for developing interim goals. (1) RECOVER, using best available science and... available science. These goals may be modified, based on best available science and the adaptive assessment...) Improvement in native plant and animal abundance. (3) In developing the interim goals based upon water...

  5. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section. (c) Principles for developing interim goals. (1) RECOVER, using best available science and... available science. These goals may be modified, based on best available science and the adaptive assessment...) Improvement in native plant and animal abundance. (3) In developing the interim goals based upon water...

  6. 20 CFR 801.202 - Interim appointments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Interim appointments. 801.202 Section 801.202 Employees' Benefits BENEFITS REVIEW BOARD, DEPARTMENT OF LABOR ESTABLISHMENT AND OPERATION OF THE BOARD Members of the Board § 801.202 Interim appointments. (a) Acting Chairman. In the event that the...

  7. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  8. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  9. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  10. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  11. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  12. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Interim sanctions. 356.18 Section 356.18 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE PROCEDURES AND RULES FOR IMPLEMENTING ARTICLE 1904 OF THE NORTH AMERICAN FREE TRADE AGREEMENT Violation of a Protective Order or a Disclosure Undertaking § 356.18 Interim sanctions....

  13. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as...

  14. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  15. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  16. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  17. Joint Polar Satellite System (JPSS) Common Ground System (CGS) Architecture Overview and Technical Performance Measures

    NASA Astrophysics Data System (ADS)

    Grant, K. D.; Johnson, B. R.; Miller, S. W.; Jamilkowski, M. L.

    2014-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will replace the afternoon orbit component and ground processing system of the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA. The JPSS satellites will carry a suite of sensors designed to collect meteorological, oceanographic, climatological and geophysical observations of the Earth. The ground processing system for JPSS is known as the JPSS Common Ground System (JPSS CGS). Developed and maintained by Raytheon Intelligence, Information and Services (IIS), the CGS is a multi-mission enterprise system serving NOAA, NASA and their national and international partners. The CGS provides a wide range of support to a number of missions. Originally designed to support S-NPP and JPSS, the CGS has demonstrated its scalability and flexibility to incorporate all of these other important missions efficiently and with minimal cost, schedule and risk, while strengthening global partnerships in weather and environmental monitoring. The CGS architecture will be upgraded to Block 2.0 in 2015 to satisfy several key objectives, including: "operationalizing" S-NPP, which had originally been intended as a risk reduction mission; leveraging lessons learned to date in multi-mission support; taking advantage of newer, more reliable and efficient technologies; and satisfying new requirements and constraints due to the continually evolving budgetary environment. To ensure the CGS meets these needs, we have developed 48 Technical Performance Measures (TPMs) across 9 categories: Data Availability, Data Latency, Operational Availability, Margin, Scalability, Situational Awareness, Transition (between environments and sites), WAN Efficiency, and Data Recovery Processing. This

  18. Productivity and technical efficiency of suckler beef production systems: trends for the period 1990 to 2012.

    PubMed

    Veysset, P; Lherm, M; Roulenc, M; Troquier, C; Bébin, D

    2015-12-01

    Over the past 23 years (1990 to 2012), French beef cattle farms have expanded in size and increased labour productivity by over 60%, chiefly, though not exclusively, through capital intensification (labour-capital substitution) and simplifying herd feeding practices (more concentrates used). The technical efficiency of beef sector production systems, as measured by the ratio of the volume value (in constant euros) of farm output excluding aids to volume of intermediate consumption, has fallen by nearly 20% while income per worker has held stable thanks to subsidies and the labour productivity gains made. This aggregate technical efficiency of beef cattle systems is positively correlated to feed self-sufficiency, which is in turn negatively correlated to farm and herd size. While volume of farm output per hectare of agricultural area has not changed, forage feed self-sufficiency decreased by 6 percentage points. The continual increase in farm size and labour productivity has come at a cost of lower production-system efficiency - a loss of technical efficiency that 20 years of genetic, technical, technological and knowledge-driven progress has barely managed to offset. PMID:26577645

  19. Technical Assessment of Organic Liquid Carrier Hydrogen Storage Systems for Automotive Applications

    SciTech Connect

    Ahluwalia, R. K.; Hua, T. Q.; Peng, J. -K; Kromer, M.; Lasher, S.; McKenney, K.; Law, K.; Sinha, J.

    2011-06-21

    In 2007-2009, the DOE Hydrogen Program conducted a technical assessment of organic liquid carrier based hydrogen storage systems for automotive applications, consistent with the Program’s Multiyear Research, Development, and Demonstration Plan. This joint performance (ANL) and cost analysis (TIAX) report summarizes the results of this assessment. These results should be considered only in conjunction with the assumptions used in selecting, evaluating, and costing the systems discussed here and in the Appendices.

  20. Functions and requirements document for interim store solidified high-level and transuranic waste

    SciTech Connect

    Smith-Fewell, M.A., Westinghouse Hanford

    1996-05-17

    The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture, and interfaces.

  1. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false System technical integration requiring uniform... COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1608 System technical integration requiring uniform election of must-carry or...

  2. Technical Issues Map for the NHI System Interface and Support Systems Area: 2nd Quarter FY07

    SciTech Connect

    Steven R. Sherman

    2007-03-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway in the 2nd quarter of FY07.

  3. An Inquiry into Testing of Information Retrieval Systems. Comparative Systems Laboratory Final Technical Report, Part III: CSL Related Studies.

    ERIC Educational Resources Information Center

    Zull, Carolyn Gifford, Ed.; And Others

    This third volume of the Comparative Systems Laboratory (CSL) Final Technical Report is a collection of relatively independent studies performed on CSL materials. Covered in this document are studies on: (1) properties of files, including a study of the growth rate of a dictionary of index terms as influenced by number of documents in the file and…

  4. A VIRTUAL TECHNICAL SYSTEMS AUDIT OF RESEARCH QUALITY ASSURANCE AND RECORD MANAGEMENT SYSTEMS IN ORD, U.S EPA

    EPA Science Inventory

    NHEERL conducts technical systems audits (TSAs) on its research projects. The findings are reported by the QA Manager (QAM) to the Director of QA (DQA) as Exemplary Findings (things the QA Team liked); Corrective Actions (things that must be corrected immediately); and Areas for...

  5. Prediction and measurement of entrained flow coal gasification processes. Interim report, September 8, 1981-September 7, 1983

    SciTech Connect

    Hedman, P.O.; Smoot, L.D.; Fletcher, T.H.; Smith, P.J.; Blackham, A.U.

    1984-01-31

    This volume reports interim experimental and theoretical results of the first two years of a three year study of entrained coal gasification with steam and oxygen. The gasifier facility and testing methods were revised and improved. The gasifier was also modified for high pressure operation. Six successful check-out tests at elevated pressure were performed (55, 75, 100, 130, 170, and 215 psig), and 8 successful mapping tests were performed with the Utah bituminous coal at an elevated pressure of 137.5 psig. Also, mapping tests were performed at atmospheric pressure with a Utah bituminous coal (9 tests) and with a Wyoming subbituminous coal (14 tests). The LDV system was used on the cold-flow facility to make additional nonreactive jets mixing measurements (local mean and turbulent velocity) that could be used to help validate the two-dimensional code. The previously completed two-dimensional entrained coal gasification code, PCGC-2, was evaluated through rigorous comparison with cold-flow, pulverized coal combustion, and entrained coal gasification data. Data from this laboratory were primarily used but data from other laboratories were used when available. A complete set of the data used has been compiled into a Data Book which is included as a supplemental volume of this interim report. A revised user's manual for the two-dimensional code has been prepared and is also included as a part of this interim report. Three technical papers based on the results of this study were published or prepared. 107 references, 57 figures, 35 tables.

  6. The value of distributed generation: The PVUSA grid-support project serving Kerman Substation. Interim report, April 1994

    SciTech Connect

    Hoff, T.; Wenger, H.

    1994-07-01

    A common practice of electric utilities experiencing transmission and distribution (T and D) system overloads is to expand the substation, add lines, or upgrade equipment, all of which are capital intensive options. In 1988, it was hypothesized that strategically sited photovoltaics (PV) could benefit parts of T and D systems near or at overloaded conditions. An evaluation methodology was developed and applied to a test case (Kerman Substation near Fresno, California). Analytical results suggested that the value of PV to the T and D system could substantially exceed its energy and generation capacity value. The importance of this finding indicated the need for empirical validation. This led to the construction of a 0.5 MW PV demonstration plant by Pacific Gas and Electric Company (PG and E) at Kerman, California as part of the PVUSA (PV for Utility Scale Applications) project. PVUSA is a national public-private partnership that is assessing and demonstrating the viability of utility-scale photovoltaic electric generation systems. The Kerman PV plant, commissioned for commercial operation in June, 1993, is reported to be the first grid-support PV demonstration plant in the world. This Interim Report focuses on validating the technical aspects of grid-support PV. It provides interim validation results for four of the eight identified value components that stack up to make the ``value bar``, and compares them to 1992 Case Study estimates. Results are based on improved technical evaluation methodologies, measured plant performance under a variety of conditions, and long-term plant performance estimated using a validated computer simulation program. This report is not intended to be exhaustive in scope. It does, however, provide a thorough progress update of the validation project. Complete documentation of test procedures, data, and evaluation methods will be presented in the Final Report.

  7. Use of negotiated rulemaking in developing technical rules for low-Earth orbit mobile satellite systems

    NASA Technical Reports Server (NTRS)

    Taylor, Leslie A.

    1993-01-01

    Technical innovations have converged with the exploding market demand for mobile telecommunications to create the impetus for low-earth orbit (LEO) communications satellite systems. The so-called 'Little LEO's' propose use of VHF and UHF spectrum to provide position - location and data messaging services. The so-called 'Big LEO's' propose to utilize the RDSS bands to provide voice and data services. In the United States, several applications were filed with the U.S. Federal Communications Commission (FCC) to construct and operate these mobile satellite systems. To enable the prompt introduction of such new technology services, the FCC is using innovative approaches to process the applications. Traditionally, when the FCC is faced with 'mutually exclusive' applications, e.g. a grant of one would preclude a grant of the others, it uses selection mechanisms such as comparative hearings or lotteries. In the case of the LEO systems, the FCC has sought to avoid these time-consuming approaches by using negotiated rulemakings. The FCC's objective is to enable the multiple applicants and other interested parties to agree on technical and service rules which will enable the grant of all qualified applications. With regard to the VHF/UHF systems, the Advisory Committee submitted a consensus report to the FCC. The process for the systems operating in the bands above 1 GHz involved more parties and more issues but still provided the FCC useful technical information to guide the adoption of rules for the new mobile satellite service.

  8. Use of negotiated rulemaking in developing technical rules for low-Earth orbit mobile satellite systems

    NASA Astrophysics Data System (ADS)

    Taylor, Leslie A.

    Technical innovations have converged with the exploding market demand for mobile telecommunications to create the impetus for low-earth orbit (LEO) communications satellite systems. The so-called 'Little LEO's' propose use of VHF and UHF spectrum to provide position - location and data messaging services. The so-called 'Big LEO's' propose to utilize the RDSS bands to provide voice and data services. In the United States, several applications were filed with the U.S. Federal Communications Commission (FCC) to construct and operate these mobile satellite systems. To enable the prompt introduction of such new technology services, the FCC is using innovative approaches to process the applications. Traditionally, when the FCC is faced with 'mutually exclusive' applications, e.g. a grant of one would preclude a grant of the others, it uses selection mechanisms such as comparative hearings or lotteries. In the case of the LEO systems, the FCC has sought to avoid these time-consuming approaches by using negotiated rulemakings. The FCC's objective is to enable the multiple applicants and other interested parties to agree on technical and service rules which will enable the grant of all qualified applications. With regard to the VHF/UHF systems, the Advisory Committee submitted a consensus report to the FCC. The process for the systems operating in the bands above 1 GHz involved more parties and more issues but still provided the FCC useful technical information to guide the adoption of rules for the new mobile satellite service.

  9. Technical specification for the Sandia Management Restructure Study Team (MRST) Prototype Information System

    SciTech Connect

    Wyatt, T.R.; Hall, R.C.; Davis, L.T.; Klamerus, E.J.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Sandia Management Restructure Study Team (MRST) Prototype Information System, which resides on a Sun SPARC II workstation employing the INGRES RDBMS. The INGRES/Windows 4GL application editor was used to define the components of the two user applications which comprise the system. These specifications together with the MRST information model and corresponding database definition constitute the MRST Prototype Information System technical specification and implementation description presented herein. The MRST Prototype Information System represents a completed software product which has been presented to the Management Restructure Study Team to support the management restructing processes at Sandia National Laboratories.

  10. Crew systems: integrating human and technical subsystems for the exploration of space

    NASA Technical Reports Server (NTRS)

    Connors, M. M.; Harrison, A. A.; Summit, J.

    1994-01-01

    Space exploration missions will require combining human and technical subsystems into overall "crew systems" capable of performing under the rigorous conditions of outer space. This report describes substantive and conceptual relationships among humans, intelligent machines, and communication systems, and explores how these components may be combined to complement and strengthen one another. We identify key research issues in the combination of humans and technology and examine the role of individual differences, group processes, and environmental conditions. We conclude that a crew system is, in effect, a social cyborg, a living system consisting of multiple individuals whose capabilities are extended by advanced technology.

  11. Technical specifications manual for the MARK-1 pulsed ionizing radiation detection system. Volume 1

    SciTech Connect

    Lawrence, R.S.; Harker, Y.D.; Jones, J.L.; Hoggan, J.M.

    1993-03-01

    The MARK-1 detection system was developed by the Idaho National Engineering Laboratory for the US Department of Energy Office of Arms Control and Nonproliferation. The completely portable system was designed for the detection and analysis of intense photon emissions from pulsed ionizing radiation sources. This manual presents the technical design specifications for the MARK-1 detection system and was written primarily to assist the support or service technician in the service, calibration, and repair of the system. The manual presents the general detection system theory, the MARK-1 component design specifications, the acquisition and control software, the data processing sequence, and the system calibration procedure. A second manual entitled: Volume 2: Operations Manual for the MARK-1 Pulsed Ionizing Radiation Detection System (USDOE Report WINCO-1108, September 1992) provides a general operational description of the MARK-1 detection system. The Operations Manual was written primarily to assist the field operator in system operations and analysis of the data.

  12. High level waste interim storge architecture selection - decision report

    SciTech Connect

    Calmus, R.B.

    1996-09-27

    The U.S. Department of Energy (DOE) has embarked upon a course to acquire Hanford Site tank waste treatment and immobilization services using privatized facilities (RL 1996a). This plan contains a two-phased approach. Phase I is a proof-of-principle/connnercial demonstration- scale effort and Phase II is a fiill-scale production effort. In accordance with the planned approach, interim storage and disposal of various products from privatized facilities are to be DOE fumished. The high-level waste (BLW) interim storage options, or alternative architectures, were identified and evaluated to provide the framework from which to select the most viable method of Phase I BLW interim storage (Calmus 1996). This evaluation, hereafter referred to as the Alternative Architecture Evaluation, was performed to established performance and risk criteria (technical merit, cost, schedule, etc.). Based on evaluation results, preliminary architectures and path forward reconunendations were provided for consideration in the architecture decision- maldng process. The decision-making process used for selection of a Phase I solidified BLW interim storage architecture was conducted in accordance with an approved Decision Plan (see the attachment). This decision process was based on TSEP-07,Decision Management Procedure (WHC 1995). The established decision process entailed a Decision Board, consisting of Westinghouse Hanford Company (VY`HC) management staff, and included appointment of a VTHC Decision Maker. The Alternative Architecture Evaluation results and preliminary recommendations were presented to the Decision Board members for their consideration in the decision-making process. The Alternative Architecture Evaluation was prepared and issued before issuance of @C-IP- 123 1, Alternatives Generation and Analysis Procedure (WI-IC 1996a), but was deemed by the Board to fully meet the intent of WHC-IP-1231. The Decision Board members concurred with the bulk of the Alternative Architecture

  13. Technical specification for transferring National Pollutant Discharge Elimination System water data to the Oak Ridge Environmental Information System

    SciTech Connect

    1996-11-01

    The primary goal of this technical specification is to meet the consolidated environmental data requirements defined by the Federal Facility (FFA) and the Tennessee Oversight Agreement (TOA) as they pertain to NPDES surface water data maintained in Oak Ridge, Tennessee, by the Department of Energy`s Maintenance and Operations (M&O) contractor Martin Marietta Energy Systems and prime contractors to DOE. This technical specification describes the organizational responsibilities for getting NPDES data into OREIS, describes the logical data transfer file required from NPDES, addresses business rules and submission rules, describes the physical data transfer file, addresses configuration control of this technical specification, and addresses required changes to the current OREIS data base structure due to the requirements of NPDES.

  14. 40 CFR 270.73 - Termination of interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Termination of interim status. 270.73... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.73 Termination of interim status. Interim status terminates when: (a) Final administrative disposition of...

  15. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source...

  16. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    SciTech Connect

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  17. Interim Stabilization Equipment Essential and Support Drawing Plan

    SciTech Connect

    KOCH, M.R.

    1999-11-17

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings.

  18. Interim Stabilization Equipment Essential and Support Drawing Plan

    SciTech Connect

    KOCH, M.R.

    1999-10-22

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings.

  19. Interim Stabilization Equipment Essential and Support Drawing Plan

    SciTech Connect

    HORNER, T.M.

    2000-10-16

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a].

  20. The Development and Technical Adequacy of Seventh-Grade Reading Comprehension Measures in a Progress Monitoring Assessment System. Technical Report #1102

    ERIC Educational Resources Information Center

    Park, Bitnara Jasmine; Alonzo, Julie; Tindal, Gerald

    2011-01-01

    This technical report describes the process of development and piloting of reading comprehension measures that are appropriate for seventh-grade students as part of an online progress screening and monitoring assessment system, http://easycbm.com. Each measure consists of an original fictional story of approximately 1,600 to 1,900 words with 20…

  1. Examining the Technical Adequacy of Fifth-Grade Reading Comprehension Measures in a Progress Monitoring Assessment System. Technical Report # 08-07

    ERIC Educational Resources Information Center

    Alonzo, Julie; Tindal, Gerald

    2008-01-01

    This technical report describes the development and piloting of reading comprehension measures developed for use by fifth-grade students as part of an online progress monitoring assessment system, http://easycbm.com. Each comprehension measure is comprised of an original work of narrative fiction approximately 1500 words in length followed by 20…

  2. Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 3

    NASA Technical Reports Server (NTRS)

    Levak, Daniel

    1993-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.

  3. Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystems Concepts. Volume 3; Program Cost Estimates

    NASA Technical Reports Server (NTRS)

    Levack, Daniel J. H.

    2000-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.

  4. Advanced coal-fueled gas turbine systems, Volume 1: Annual technical progress report

    SciTech Connect

    Not Available

    1988-07-01

    This is the first annual technical progress report for The Advanced Coal-Fueled Gas Turbine Systems Program. Two semi-annual technical progress reports were previously issued. This program was initially by the Department of Energy as an R D effort to establish the technology base for the commercial application of direct coal-fired gas turbines. The combustion system under consideration incorporates a modular three-stage slagging combustor concept. Fuel-rich conditions inhibit NO/sub x/ formation from fuel nitrogen in the first stage; coal ash and sulfur is subsequently removed from the combustion gases by an impact separator in the second stage. Final oxidation of the fuel-rich gases and dilution to achieve the desired turbine inlet conditions are accomplished in the third stage. 27 figs., 15 tabs.

  5. Technical analysis of US Army Weapons Systems and related advanced technologies of military interest. Final report

    SciTech Connect

    1991-06-14

    This report summarizes the activities and accomplishments of an US Army technology security project designed to identify and develop effective policy guidelines for militarily critical technologies in specific Army systems and in broad generic technology areas of military interest, Individual systems analyses are documented in separate Weapons Systems Technical Assessments (WSTAs) and the general generic technology areas are evaluated in the Advanced Technology Assessment Reports (ATARs), However, specific details of these assessments are not addressed here, only recommendations regarding aspects of the defined approach, methodology, and format are provided and discussed.

  6. Development of a Foam OTEC System. Final technical report for Fiscal Year 1979

    SciTech Connect

    Not Available

    1980-01-01

    Research on Development of a Foam OTEC System, as carried out at Carnegie-Mellon University from October 1, 1978 through September 30, 1979, is described. To a brief section summarizing highlights of research results are appended 12 technical reports which detail specific sections of the program. The work described is continuing and a proposal is currently being submitted to provide support in fiscal 1980.

  7. Ultrasonic cleaning as a replacement for a chlorofluorocarbon-based system. Technical report

    SciTech Connect

    Kranz, P.B.; Gardner-Clayson, T.; Malinowski, K.C.; Schaab, T.D.; Stadelmaier, J.E.

    1993-11-01

    This report describes the technical and economic evaluation of the replacement of a vapor degreasing system with an ultrasonic cleaning system to clean stainless steel components. A heated inorganic water-based cleaning fluid was utilized in lieu of a chlorofluorocarbon (CFC, freon) resulting in a significant reduction in the generation of fugitive volatile emissions. The objective of this evaluation was to comparatively analyze the technical and economic advantages of employing an ultrasonic cleaning system for reducing both the use and generation of hazardous materials associated with conventional CFC usage. Through the installation of an ultrasonic cleaning system, fugitive emissions have been significantly curtailed. Volatile emissions are estimated to be reduced 68% over the period 1990 to 1992. The technology substitution did not adversely affect product quality, although processing time was increased. No parts have been rejected for cleanliness by customers from either cleaning system, and there have been no consumer complaints. Throughput in terms of parts/cycle for the freon system was comparable to the ultrasonic cleaning system. Raw material cost savings are substantial for the ultrasonic cleaning system.

  8. Technical and patient performance using a virtual reality-integrated telerehabilitation system: preliminary finding.

    PubMed

    Deutsch, Judith E; Lewis, Jeffrey A; Burdea, Grigore

    2007-03-01

    Telerehabilitation is the provision of rehabilitation services at a distance by a therapist at a remote location. Integration with virtual reality (VR) is a relatively new addition to this field. This paper describes the technical and patient performance of a telerehabilitation application the remote console (ReCon) that is integrated with a VR system. The VR system consists of the Rutgers Ankle prototype robot, a local PC which is connected with a remote PC connected over the Internet. Six individuals in the chronic phase poststroke participated in a four week training program. They used the robot to interact with two VR simulations, while the therapist was in the same room during the first three weeks or in another room during the fourth week. Technical and patient performance was assessed in the transition from the third to the fourth week of training. Technical performance of the system was assessed based on bandwidth and lag of message transmission, which were found to be suitable for clinic-to-clinic communication. Patient performance (in terms of accuracy of ankle movement, exercise duration and training efficiency, mechanical power of the ankle, and number of repetitions) did not decrease during telerehabilitation in the fourth week. These preliminary findings over a short telerehabilitation intervention support the feasibility of remote monitoring of VR-based telerehabilitation without adverse effects on patient performance. PMID:17436873

  9. Data management implementation plan for interim action at the Gunite and Associated Tanks, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    The Gunite and Associated Tanks (GAAT) Project is currently conducting a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Interim Remedial Action to reduce uncertainties on the potential cost and effectiveness of remote tank cleaning equipment being produced jointly between the US Department of Energy (DOE); Oak Ridge National Laboratory (ORNL); Lockheed Martin Energy Systems, Inc.; and associated subcontractors with the DOE EM-50 Program. The goal of this document is to ensure that all procedures have been followed to provide reliable, verifiable data that are technically defensible. The data collected will be used to support closure of the tanks, compare the expected versus actual waste volume and curies to aid in conducting operations, and verify the performance of developmental equipment.

  10. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ...This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and the Interim Model Deputation Agreements that will be used by the Office of Justice Services following passage of the Tribal Law and Order Act of 2010. Three Interim Model Deputation Agreements will be used: one agreement for tribes in Public Law 83-280 States, one for tribes in Oklahoma, and......

  11. Technical-Oriented Enterprise Resource Planning (ERP) Body of Knowledge for Information Systems Programs: Content and Implementation

    ERIC Educational Resources Information Center

    Boyle, Todd A.

    2007-01-01

    In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…

  12. 25 CFR 547.8 - What are the minimum technical software standards applicable to Class II gaming systems?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 2 2014-04-01 2014-04-01 false What are the minimum technical software standards... EQUIPMENT § 547.8 What are the minimum technical software standards applicable to Class II gaming systems... adopted by the tribe or TGRA; (ii) Display player interface identification; and (iii) Display...

  13. Alaska interim land cover mapping program

    USGS Publications Warehouse

    U.S. Geological Survey

    1987-01-01

    In order to meet the requirements of the Alaska National Interest Lands Conservation Act (ANILCA) for comprehensive resource and management plans from all major land management agencies in Alaska, the USGS has begun a program to classify land cover for the entire State using Landsat digital data. Vegetation and land cover classifications, generated in cooperation with other agencies, currently exist for 115 million acres of Alaska. Using these as a base, the USGS has prepared a comprehensive plan for classifying the remaining areas of the State. The development of this program will lead to a complete interim vegetation and land cover classification system for Alaska and allow the dissemination of digital data for those areas classified. At completion, 153 Alaska 1:250,000-scale quadrangles will be published and will include land cover from digital Landsat classifications, statistical summaries of all land cover by township, and computer-compatible tapes. An interagency working group has established an Alaska classification system (table 1) composed of 18 classes modified from "A land use and land cover classification system for use with remote sensor data" (Anderson and others, 1976), and from "Revision of a preliminary classification system for vegetation of Alaska" (Viereck and Dyrness, 1982) for the unique ecoregions which are found in Alaska.

  14. Technical needs and research opportunities provided by projected aeronautical and space systems

    NASA Technical Reports Server (NTRS)

    Noor, Ahmed K.

    1992-01-01

    The overall goal of the present task is to identify the enabling and supporting technologies for projected aeronautical and space systems. A detailed examination was made of the technical needs in the structures, dynamics and materials areas required for the realization of these systems. Also, the level of integration required with other disciplines was identified. The aeronautical systems considered cover the broad spectrum of rotorcraft; subsonic, supersonic and hypersonic aircraft; extremely high-altitude aircraft; and transatmospheric vehicles. The space systems considered include space transportation systems; spacecrafts for near-earth observation; spacecrafts for planetary and solar exploration; and large space systems. A monograph is being compiled which summarizes the results of this study. The different chapters of the monograph are being written by leading experts from governmental laboratories, industry and universities.

  15. Evolving the Technical Infrastructure of the Planetary Data System for the 21st Century

    NASA Technical Reports Server (NTRS)

    Beebe, Reta F.; Crichton, D.; Hughes, S.; Grayzeck, E.

    2010-01-01

    The Planetary Data System (PDS) was established in 1989 as a distributed system to assure scientific oversight. Initially the PDS followed guidelines recommended by the National Academies Committee on Data Management and Computation (CODMAC, 1982) and placed emphasis on archiving validated datasets. But overtime user demands, supported by increased computing capabilities and communication methods, have placed increasing demands on the PDS. The PDS must add additional services to better enable scientific analysis within distributed environments and to ensure that those services integrate with existing systems and data. To face these challenges the Planetary Data System (PDS) must modernize its architecture and technical implementation. The PDS 2010 project addresses these challenges. As part of this project, the PDS has three fundamental project goals that include: (1) Providing more efficient client delivery of data by data providers to the PDS (2) Enabling a stable, long-term usable planetary science data archive (3) Enabling services for the data consumer to find, access and use the data they require in contemporary data formats. In order to achieve these goals, the PDS 2010 project is upgrading both the technical infrastructure and the data standards to support increased efficiency in data delivery as well as usability of the PDS. Efforts are underway to interface with missions as early as possible and to streamline the preparation and delivery of data to the PDS. Likewise, the PDS is working to define and plan for data services that will help researchers to perform analysis in cost-constrained environments. This presentation will cover the PDS 2010 project including the goals, data standards and technical implementation plans that are underway within the Planetary Data System. It will discuss the plans for moving from the current system, version PDS 3, to version PDS 4.

  16. Concordance of interim and final estimates of influenza vaccine effectiveness: a systematic review.

    PubMed

    Leung, Vivian K; Cowling, Benjamin J; Feng, Shuo; Sullivan, Sheena G

    2016-04-21

    The World Health Organization's Global Influenza Surveillance and Response System meets twice a year to generate a recommendation for the composition of the seasonal influenza vaccine. Interim vaccine effectiveness (VE) estimates provide a preliminary indication of influenza vaccine performance during the season and may be useful for decision making. We reviewed 17 pairs of studies reporting 33 pairs of interim and final estimates using the test-negative design to evaluate whether interim estimates can reliably predict final estimates. We examined features of the study design that may be correlated with interim estimates being substantially different from their final estimates and identified differences related to change in study period and concomitant changes in sample size, proportion vaccinated and proportion of cases. An absolute difference of no more than 10% between interim and final estimates was found for 18 of 33 reported pairs of estimates, including six of 12 pairs reporting VE against any influenza, six of 10 for influenza A(H1N1)pdm09, four of seven for influenza A(H3N2) and two of four for influenza B. While we identified inconsistencies in the methods, the similarities between interim and final estimates support the utility of generating and disseminating preliminary estimates of VE while virus circulation is ongoing. PMID:27124573

  17. DOE UST interim subsurface barrier technologies workshop

    SciTech Connect

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation.

  18. Technical specification for the Product Evaluation Management Information System (PREMIS) Version 1. 1. 2

    SciTech Connect

    Eaton, D.S.; Hall, R.C.; Orman, J.L.; Klamerus, J.

    1990-06-01

    This document contains the technical specifications and implementation details for the Product Evaluation Management Information System (PREMIS) Version 1.1.2. This document does not include the requirements analysis or design information and is not intended as a user's guide. The INGRES Applications-by-Forms (ABF) software development tool was used to specify and define the modules and screens which comprise the PREMIS application. Several external procedures are called by the ABF procedures; these have been written in VAX/VMS DCL (Digital Command Language) and SQL (Standard Query Language). These specifications together with the PREMIS information model and corresponding database definition constitute the PREMIS Version 1.1.2 technical specification and implementation description presented herein.

  19. The proceedings of the 23rd International Technical Conference on Coal Utilization and Fuel Systems

    SciTech Connect

    Sakkestad, B.A.

    1998-03-01

    This document contains the proceedings of the 23rd International Technical Conference on Coal Utilization and Fuel Systems, held March 9-13, 1998 in Clearwater, Florida. Topics included advanced combustion systems, alternative fuels, coal liquefaction, climate change strategies, international highlights, combustion by-product utilization, co-firing, fuel gas treatment, low nitrogen oxide burners, carbon dioxide mitigation, power plant upgrades, Latin American coal perspective, coal fines utilization, upgraded coal for the power industry, hot gas particulate cleanup, coal conversion, hydraulics and transportation, coal briquetting and coal beneficiation, air toxics, materials and equipment, and coal-water fuels preparation. Separate abstracts have been prepared for the individual papers presented at this conference.

  20. Second NASA Technical Interchange Meeting (TIM): Advanced Technology Lifecycle Analysis System (ATLAS) Technology Tool Box (TTB)

    NASA Technical Reports Server (NTRS)

    ONeil, D. A.; Mankins, J. C.; Christensen, C. B.; Gresham, E. C.

    2005-01-01

    The Advanced Technology Lifecycle Analysis System (ATLAS), a spreadsheet analysis tool suite, applies parametric equations for sizing and lifecycle cost estimation. Performance, operation, and programmatic data used by the equations come from a Technology Tool Box (TTB) database. In this second TTB Technical Interchange Meeting (TIM), technologists, system model developers, and architecture analysts discussed methods for modeling technology decisions in spreadsheet models, identified specific technology parameters, and defined detailed development requirements. This Conference Publication captures the consensus of the discussions and provides narrative explanations of the tool suite, the database, and applications of ATLAS within NASA s changing environment.

  1. Technical and economic feasibility study of solar/fossil hybrid power systems

    NASA Technical Reports Server (NTRS)

    Bloomfield, H. S.; Calogeras, J. E.

    1977-01-01

    Results show that new hybrid systems utilizing fossil fuel augmentation of solar energy can provide significant capital and energy cost benefits when compared with solar thermal systems requiring thermal storage. These benefits accrue from a reduction of solar collection area that results from both the use of highly efficient gas and combined cycle energy conversion subsystems and elimination of the requirement for long-term energy storage subsystems. Technical feasibility and fuel savings benefits of solar hybrid retrofit to existing fossil-fired, gas and vapor cycle powerplants was confirmed; however, economic viability of steam cycle retrofit was found to be dependent on the thermodynamic and operational characteristics of the existing powerplant.

  2. A technical approach for determining the importance of information in computerized alarm systems

    SciTech Connect

    Fortney, D.S.; Lim, J.J.

    1994-06-10

    Computerized alarm and access control systems must be treated as special entities rather than as generic automated information systems. This distinction arises due to the real-time control and monitoring functions performed by these systems at classified facilities and the degree of centralization of a site`s safeguards system information in the associated databases. As an added requirement for these systems, DOE safeguards and security classification policy is to protect information whose dissemination has the potential for significantly increasing the probability of successful adversary action against the facility, or lowering adversary resources needed for a successful attack. Thus at issue is just how valuable would specific alarm system information be to an adversary with a higher order objective. We have developed and applied a technical approach for determining the importance of information contained in computerized alarm and access control systems. The methodology is based on vulnerability assessment rather than blanket classification rules. This method uses a system architecture diagram to guide the analysis and to develop adversary defeat methods for each node and link. These defeat methods are evaluated with respect to required adversary resources, technical difficulty, and detection capability. Then they are incorporated into site vulnerability assessments to determine the significance of alarm system information in the context of a facility attack. This methodology was successfully applied to the Argus alarm, access control, and assessment system developed at the Lawrence Livermore National Lab. Argus is software-driven, contains interrelated databases, shares host computers, and communicates with field processors and alarms through a common network. The evaluation results provided insights into the importance of alarm system information while the methodology itself provided a framework for addressing associated information protection issues.

  3. Technical support for the Soiltech soil washing project. Interim report

    SciTech Connect

    Tomascik, T.S.

    1994-08-01

    The organic removal ability of a surfactant solution was studied for an ``as-received`` soil sample. A 15% surfactant solution was added to an equal portion of the soil sample, by volume, and blended. The mixture was then stirred with a magnetic stirrer. A black precipitate resulted, which was then periodically skimmed off the top of the solution. This was done at both room temperature and at 150{degrees}F. The soil sample was examined before and after processing with optical microscopy, environmental scanning electron microscopy (ESEM) , energy dispersive x-ray microanalysis (EDS), and analytical chemical analysis (total oil and grease and petroleum hydrocarbons).

  4. Library Technical Assistant -- A Paraprofessional Training Institute, Interim Report.

    ERIC Educational Resources Information Center

    Schutte, Alfred J.

    The Merrimack Valley Branch of the University of New Hampshire became acutely aware of the need for trained library aides to assist in the local schools, industrial and public libraries of the greater Manchester, New Hampshire area. The administration also realized that there were many people in the community interested in (1) furthering their…

  5. Environmental DNA calibration study. Interim technical review report

    USGS Publications Warehouse

    Baerwaldt, K.; Bartron, Meredith; Schilling, K.; Lee, Debbie; Russo, Edmond; Estes, Trudy; Fischer, Richard; Fleming, Beth; Guilfoyle, Michael P.; Kilgore, K. Jack; Lance, Richard; Perkins, Edward; Schultz, Martin; Smith, David; Amberg, Jon J.; Chapman, Duane C.; Gaikowski, Mark P.; Klymus, Katy E.; Richter, Catherine A.

    2014-01-01

    Should a sustainable Asian carp population become established in the Great Lakes, native fish populations, as well as many threatened or endangered plant/animal species populations, could be impacted. In response to this threat, the Asian Carp Regional Control Committee (ACRCC) was formed in part to coordinate efforts to understand and organize against the Asian carp threat. The Asian Carp Control Strategy Framework (2012a) outlined major tasks to be completed for a better understanding of factors related to the advance of Asian carp populations towards the Great Lakes. In addition, the ACRCC formed the Monitoring and Rapid Response Workgroup to address Asian carp monitoring and removal (ACRCC 2012b).

  6. Analysis of Aviation Safety Reporting System Incident Data Associated With the Technical Challenges of the Vehicle Systems Safety Technology Project

    NASA Technical Reports Server (NTRS)

    Withrow, Colleen A.; Reveley, Mary S.

    2014-01-01

    This analysis was conducted to support the Vehicle Systems Safety Technology (VSST) Project of the Aviation Safety Program (AVsP) milestone VSST4.2.1.01, "Identification of VSST-Related Trends." In particular, this is a review of incident data from the NASA Aviation Safety Reporting System (ASRS). The following three VSST-related technical challenges (TCs) were the focus of the incidents searched in the ASRS database: (1) Vechicle health assurance, (2) Effective crew-system interactions and decisions in all conditions; and (3) Aircraft loss of control prevention, mitigation, and recovery.

  7. Socio-Technical Perspective on Interdisciplinary Interactions During the Development of Complex Engineered Systems

    NASA Technical Reports Server (NTRS)

    McGowan, Anna-Maria R.; Daly, Shanna; Baker, Wayne; Papalambros, panos; Seifert, Colleen

    2013-01-01

    This study investigates interdisciplinary interactions that take place during the research, development, and early conceptual design phases in the design of large-scale complex engineered systems (LaCES) such as aerospace vehicles. These interactions, that take place throughout a large engineering development organization, become the initial conditions of the systems engineering process that ultimately leads to the development of a viable system. This paper summarizes some of the challenges and opportunities regarding social and organizational issues that emerged from a qualitative study using ethnographic and survey data. The analysis reveals several socio-technical couplings between the engineered system and the organization that creates it. Survey respondents noted the importance of interdisciplinary interactions and their benefits to the engineered system as well as substantial challenges in interdisciplinary interactions. Noted benefits included enhanced knowledge and problem mitigation and noted obstacles centered on organizational and human dynamics. Findings suggest that addressing the social challenges may be a critical need in enabling interdisciplinary interactions

  8. Technical evaluation of a CAD system for orthopaedic shoe-upper design.

    PubMed

    Lord, M; Foulston, J; Smith, P J

    1991-01-01

    Computer aided design is now employed routinely in the volume shoe trade. New styles are developed on a three-dimensional image of the last followed by automated pattern generation and engineering. It is suggested that such systems could be useful in the orthopaedic footwear industry although the different requirements for these bespoke products need careful consideration. A clinical trial has been conducted on the Shoemaster (Clarks Shoes) upper design system both to assess its technical capabilities and to consider its role in improvement of service and cosmetic appearance. This particular system works throughout on a three-dimensional representation of the shoe last, which offers particular advantages for integration with shape capture and reproduction. The report concentrates on the technical evaluation to assess (a) its ability to work with unusual last shapes dictated by medical requirements and (b) its potential for integration into a complete computer system for design of both shoe lasts and shoe uppers. The trial indicates that this particular system is promising in both respects. PMID:1840716

  9. Markets, Availability, Notice, and Technical Performance of Terahertz Systems: Historic Development, Present, and Trends

    NASA Astrophysics Data System (ADS)

    Hochrein, Thomas

    2015-03-01

    Although a lot of work has already been done under the older terms "far infrared" or "sub-millimeter waves", the term "terahertz" stands for a novel technique offering many potential applications. The latter term also represents a new generation of systems with the opportunity for coherent, time-resolved detection. In addition to the well-known technical opportunities, an historical examination of Internet usage, as well as the number of publications and patent applications, confirms ongoing interest in this technique. These activities' annual growth rate is between 9 % and 21 %. The geographical distribution shows the center of terahertz activities. A shift from the scientific to more application-oriented research can be observed. We present a survey among worldwide terahertz suppliers with special focus on the European region and the use of terahertz systems in the field of measurement and analytical applications. This reveals the current state of terahertz systems' commercial and geographical availability as well as their costs, target markets, and technical performance. Component cost distribution using the example of an optical pulsed time-domain terahertz system gives an impression of the prevailing cost structure. The predication regarding prospective market development, decreasing system costs and higher availability shows a convenient situation for potential users and interested customers. The causes are primarily increased competition and larger quantities in the future.

  10. Technical basis for acceptance criteria on the susceptibility of digital systems to electromagnetic interference

    SciTech Connect

    Ewing, P.D.; Korsah, K.; Antonescu, C.

    1992-12-31

    This paper discusses the development of the technical basis for establishing acceptance criteria on the susceptibility of digital systems to electromagnetic interference (EMI). The effort is sponsored by the US Nuclear Regulatory Commission and stems from the safety-related issues that need to be addressed with the application of digital instrumentation and controls systems in nuclear power plants. Designers of digital circuits are incorporating increasingly higher clock frequencies and lower logic voltage levels, thereby leading to the risk of susceptibility when spurious interference is misinterpreted as legitimate logic. Development of the technical basis for acceptance criteria centers around establishing good engineering practices to ensure that sufficient levels of electromagnetic compatibility (EMC) are maintained between the nuclear power plant`s electronic and electromechanical systems. First, good EMC design and installation practices are needed to control the emissions from interference sources and their impact on other nearby circuits and systems. Then, a test and evaluation program is needed to outline the EMI tests to be performed, the associated test methods to be followed, and adequate test limits to ensure that the circuit or system under test meets the recommended guidelines. Test and evaluation should be followed by periodic maintenance to assess whether the recommended EMI control practices continue to be adhered to as part of the routine operation of the nuclear power plant. By following these steps, the probability of encountering safety-related problems associated with EMI will be greatly reduced.

  11. Technical experience from clinical studies with INPRES and a concept for a miniature augmented reality system

    NASA Astrophysics Data System (ADS)

    Sudra, Gunther; Marmulla, Ruediger; Salb, Tobias; Gockel, Tilo; Eggers, Georg; Giesler, Bjoern; Ghanai, Sassan; Fritz, Dominik; Dillmann, Ruediger; Muehling, Joachim

    2005-04-01

    This paper is going to present a summary of our technical experience with the INPRES System -- an augmented reality system based upon a tracked see-through head-mounted display. With INPRES a complete augmented reality solution has been developed that has crucial advantages when compared with previous navigation systems. Using these techniques the surgeon does not need to turn his head from the patient to the computer monitor and vice versa. The system's purpose is to display virtual objects, e.g. cutting trajectories, tumours and risk-areas from computer-based surgical planning systems directly in the surgical site. The INPRES system was evaluated in several patient experiments in craniofacial surgery at the Department of Oral and Maxillofacial Surgery/University of Heidelberg. We will discuss the technical advantages as well as the limitations of INPRES and present two strategies as a result. On the one hand we will improve the existing and successful INPRES system with new hardware and a new calibration method to compensate for the stated disadvantage. On the other hand we will focus on miniaturized augmented reality systems and present a new concept based on fibre optics. This new system should be easily adaptable at surgical instruments and capable of projecting small structures. It consists of a source of light, a miniature TFT display, a fibre optic cable and a tool grip. Compared to established projection systems it has the capability of projecting into areas that are only accessible by a narrow path. No wide surgical exposure of the region is necessary for the use of augmented reality.

  12. Application of Spatial Data Modeling Systems, Geographical Information Systems (GIS), and Transportation Routing Optimization Methods for Evaluating Integrated Deployment of Interim Spent Fuel Storage Installations and Advanced Nuclear Plants

    SciTech Connect

    Mays, Gary T; Belles, Randy; Cetiner, Sacit M; Howard, Rob L; Liu, Cheng; Mueller, Don; Omitaomu, Olufemi A; Peterson, Steven K; Scaglione, John M

    2012-06-01

    The objective of this siting study work is to support DOE in evaluating integrated advanced nuclear plant and ISFSI deployment options in the future. This study looks at several nuclear power plant growth scenarios that consider the locations of existing and planned commercial nuclear power plants integrated with the establishment of consolidated interim spent fuel storage installations (ISFSIs). This research project is aimed at providing methodologies, information, and insights that inform the process for determining and optimizing candidate areas for new advanced nuclear power generation plants and consolidated ISFSIs to meet projected US electric power demands for the future.

  13. Decontamination Systems Information and Research Program. Quarterly technical progress report, January 1--March 31, 1994

    SciTech Connect

    Not Available

    1994-05-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Reports on a quarterly basis. This report comprises the first Quarterly Technical Progress Report for Year 2 of the Agreement. This report reflects the progress and/or efforts performed on the sixteen (16) technical projects encompassed by the Year 2 Agreement for the period of January 1 through March 31, 1994. In situ bioremediation of chlorinated organic solvents; Microbial enrichment for enhancing in-situ biodegradation of hazardous organic wastes; Treatment of volatile organic compounds (VOCs) using biofilters; Drain-enhanced soil flushing (DESF) for organic contaminants removal; Chemical destruction of chlorinated organic compounds; Remediation of hazardous sites with steam reforming; Soil decontamination with a packed flotation column; Use of granular activated carbon columns for the simultaneous removal of organics, heavy metals, and radionuclides; Monolayer and multilayer self-assembled polyion films for gas-phase chemical sensors; Compact mercuric iodide detector technology development; Evaluation of IR and mass spectrometric techniques for on-site monitoring of volatile organic compounds; A systematic database of the state of hazardous waste clean-up technologies; Dust control methods for insitu nuclear and hazardous waste handling; Winfield Lock and Dam remediation; and Socio-economic assessment of alternative environmental restoration technologies.

  14. Report on interim storage of spent nuclear fuel. Midwestern high-level radioactive waste transportation project

    SciTech Connect

    Not Available

    1993-04-01

    The report on interim storage of spent nuclear fuel discusses the technical, regulatory, and economic aspects of spent-fuel storage at nuclear reactors. The report is intended to provide legislators state officials and citizens in the Midwest with information on spent-fuel inventories, current and projected additional storage requirements, licensing, storage technologies, and actions taken by various utilities in the Midwest to augment their capacity to store spent nuclear fuel on site.

  15. Architecture Analysis of Evolving Complex Systems of Systems: Technical Presentation [and Executive Status Report

    NASA Technical Reports Server (NTRS)

    Lindvall, Mikael; Godfrey, Sally; Ackermann, Chris; Ray, Arnab; Yonkwa, Lyly; Ganesan, Dharma; Stratton, William C.; Sibol, Deane E.

    2008-01-01

    Analyze, Visualize, and Evaluate structure and behavior using static and dynamic information, individual systems as well as systems of systems. Next steps: Refine software tool support; Apply to other systems; and Apply earlier in system life cycle.

  16. A tool for technical assessment of rural water supply systems in South Africa

    NASA Astrophysics Data System (ADS)

    Rietveld, L. C.; Haarhoff, J.; Jagals, P.

    Water and sanitation services provide a cost-effective solution for alleviating the impact of water-borne diseases. Actually, for water supply projects a top-down approach is followed, giving priority to deliver sufficient quantities of water, increasing its availability by investment in new systems. Little attention is paid to the functioning of these systems on the long-term, and its maintenance and operational constraints. In this paper, a methodology was developed to technically assess water supply systems based on four criteria, namely availability, capacity, continuity and condition. The practicality of the approach is demonstrated by a technical assessment of a number of water supply systems in the Vhembe District in South Africa. The systems consist of piped distribution systems with public standpipes, mostly fed by groundwater. In general, it can be concluded that the performance of the systems, although relatively new, is poor. The availability (criterion 1) of the drinking water is a problem due to poorly constructed boreholes or disagreement on the payment of the operational cost after construction. In most villages the capacity (criterion 2) of the installed infrastructure is sufficient, although storage volume is in some villages too small. The continuity (criterion 3) of the water supply is threatened by disputes about payment of diesel for the pump and maintenance and repair of the pump. Finally, the condition (criterion 4) is poor mostly due to taps at the standpipes which are damaged and require frequent replacement. Despite the simplicity of the proposed assessment methodology, it provides rapid insight in the state of a system and is ideal for bench marking the performance of different systems in different regions. Furthermore, the quantitative measures of the four different criteria allow system operators and planners to rapidly pinpoint the reasons for poor performance and to take the appropriate corrective action. The used weighting factors

  17. Technical challenges and future direction for high-efficiency metal hydride thermal energy storage systems

    NASA Astrophysics Data System (ADS)

    Ward, Patrick A.; Corgnale, Claudio; Teprovich, Joseph A.; Motyka, Theodore; Hardy, Bruce; Sheppard, Drew; Buckley, Craig; Zidan, Ragaiy

    2016-04-01

    Recently, there has been increasing interest in thermal energy storage (TES) systems for concentrated solar power (CSP) plants, which allow for continuous operation when sunlight is unavailable. Thermochemical energy storage materials have the advantage of much higher energy densities than latent or sensible heat materials. Furthermore, thermochemical energy storage systems based on metal hydrides have been gaining great interest for having the advantage of higher energy densities, better reversibility, and high enthalpies. However, in order to achieve higher efficiencies desired of a thermal storage system by the US Department of Energy, the system is required to operate at temperatures >600 °C. Operation at temperatures >600 °C presents challenges including material selection, hydrogen embrittlement and permeation of containment vessels, appropriate selection of heat transfer fluids, and cost. Herein, the technical difficulties and proposed solutions associated with the use of metal hydrides as TES materials in CSP applications are discussed and evaluated.

  18. Technical Challenges in the Development of a NASA Synthetic Vision System Concept

    NASA Technical Reports Server (NTRS)

    Bailey, Randall E.; Parrish, Russell V.; Kramer, Lynda J.; Harrah, Steve; Arthur, J. J., III

    2002-01-01

    Within NASA's Aviation Safety Program, the Synthetic Vision Systems Project is developing display system concepts to improve pilot terrain/situation awareness by providing a perspective synthetic view of the outside world through an on-board database driven by precise aircraft positioning information updating via Global Positioning System-based data. This work is aimed at eliminating visibility-induced errors and low visibility conditions as a causal factor to civil aircraft accidents, as well as replicating the operational benefits of clear day flight operations regardless of the actual outside visibility condition. Synthetic vision research and development activities at NASA Langley Research Center are focused around a series of ground simulation and flight test experiments designed to evaluate, investigate, and assess the technology which can lead to operational and certified synthetic vision systems. The technical challenges that have been encountered and that are anticipated in this research and development activity are summarized.

  19. An analysis of alternative New Technical Strategy flowsheets for tank waste remediation system

    SciTech Connect

    Booker, C.P.

    1994-06-01

    The Hanford Tank remediation plans have gone through a few revisions for the best waste processing system. Some designs have been complex while others have been fairly simple. One of the key means in understanding and selecting among the various proposed systems is a discrete events modeling of the system. This modeling provides insight into (1) The total required size of the system; (2) The amount of material, such as reagents and other added materials that must be supplied; (3) The final mass of waste that must be stored; and (4) Areas within the system where a small change can greatly effect the total system. Discrete events modeling also provides the means by which various proposed systems may be compared. It is the framework in which variations within a particular system may be explored and compared to other instantiations. This study examines the current New Technical Strategy flowsheet system with discrete event modeling. Some of the possible variations within that system are examined and compared. Further, an previously proposed, more complex system is examined.

  20. Building persistent identifier systems for geoscience research - Technical solutions and community governance

    NASA Astrophysics Data System (ADS)

    Klump, J. F.; Lehnert, K. A.; Huber, R.

    2015-12-01

    The emergence of the Internet gave rise to the expectation that the internet would lead to greater accessibility, transparency and reproducibility of research results. New communication technologies enabled far easier and faster collaboration in larger, geographically more distributed networks. However, the distributed and disorganised nature of the internet not only allowed new technologies to emerge, it also made it difficult to maintain a persistent record of science. Persistent identifiers were invented to allow unambiguous identification of resources on the net. At first, these resources referred to scholarly literature and related resources. The concept of using persistent identifiers has since been expanded to other, non-textual resources, like datasets and geological specimens, and more recently to authors and contributors of scholarly works, and to software and instruments.Setting up identifier systems is technically trivial. The real challenge lies in creating a governance system for the respective identifiers. While Digital Object Identifiers (DOI) were originally invented by the publishing industry, they quickly became an established way for the identification of research resources. Other identifier systems, some of them using DOI as an example, were developed as grass-roots efforts by the scientific community.Together with semantic technologies and linked data, unambiguous identification allows us to harness information at large scales beyond human comprehension. The technical possibilities offered by technology challenge some of the norms of scholarly cooperation, such as using and sharing resources beyond the emulation of paper-based publications.This presentation will discuss the development of persistent identification of research resources as a community effort, using the technical and governance patterns developed for DOI and for IGSN for data as an example.