Sample records for t-111 rankine system

  1. T-111 Rankine system corrosion test loop, volume 1

    NASA Technical Reports Server (NTRS)

    Harrison, R. W.; Hoffman, E. E.; Smith, J. P.

    1975-01-01

    Results are given of a program whose objective was to determine the performance of refractory metal alloys in a two loop Rankine test system. The test system consisted of a circulating lithium circuit heated to 1230 C maximum transferring heat to a boiling potassium circuit with a 1170 C superheated vapor temperature. The results demonstrate the suitability of the selected refractory alloys to perform from a chemical compatibility standpoint.

  2. Rankine cycle waste heat recovery system

    DOEpatents

    Ernst, Timothy C.; Nelson, Christopher R.

    2016-05-10

    This disclosure relates to a waste heat recovery (WHR) system and to a system and method for regulation of a fluid inventory in a condenser and a receiver of a Rankine cycle WHR system. Such regulation includes the ability to regulate the pressure in a WHR system to control cavitation and energy conversion.

  3. Rankine cycle waste heat recovery system

    DOEpatents

    Ernst, Timothy C.; Nelson, Christopher R.

    2014-08-12

    This disclosure relates to a waste heat recovery (WHR) system and to a system and method for regulation of a fluid inventory in a condenser and a receiver of a Rankine cycle WHR system. Such regulation includes the ability to regulate the pressure in a WHR system to control cavitation and energy conversion.

  4. Rankine cycle system and method

    DOEpatents

    Ernst, Timothy C.; Nelson, Christopher R.

    2014-09-09

    A Rankine cycle waste heat recovery system uses a receiver with a maximum liquid working fluid level lower than the minimum liquid working fluid level of a sub-cooler of the waste heat recovery system. The receiver may have a position that is physically lower than the sub-cooler's position. A valve controls transfer of fluid between several of the components in the waste heat recovery system, especially from the receiver to the sub-cooler. The system may also have an associated control module.

  5. Combined rankine and vapor compression cycles

    DOEpatents

    Radcliff, Thomas D.; Biederman, Bruce P.; Brasz, Joost J.

    2005-04-19

    An organic rankine cycle system is combined with a vapor compression cycle system with the turbine generator of the organic rankine cycle generating the power necessary to operate the motor of the refrigerant compressor. The vapor compression cycle is applied with its evaporator cooling the inlet air into a gas turbine, and the organic rankine cycle is applied to receive heat from a gas turbine exhaust to heat its boiler within one embodiment, a common condenser is used for the organic rankine cycle and the vapor compression cycle, with a common refrigerant, R-245a being circulated within both systems. In another embodiment, the turbine driven generator has a common shaft connected to the compressor to thereby eliminate the need for a separate motor to drive the compressor. In another embodiment, an organic rankine cycle system is applied to an internal combustion engine to cool the fluids thereof, and the turbo charged air is cooled first by the organic rankine cycle system and then by an air conditioner prior to passing into the intake of the engine.

  6. Organic rankine cycle system for use with a reciprocating engine

    DOEpatents

    Radcliff, Thomas D.; McCormick, Duane; Brasz, Joost J.

    2006-01-17

    In a waste heat recovery system wherein an organic rankine cycle system uses waste heat from the fluids of a reciprocating engine, provision is made to continue operation of the engine even during periods when the organic rankine cycle system is inoperative, by providing an auxiliary pump and a bypass for the refrigerant flow around the turbine. Provision is also made to divert the engine exhaust gases from the evaporator during such periods of operation. In one embodiment, the auxiliary pump is made to operate simultaneously with the primary pump during normal operations, thereby allowing the primary pump to operate at lower speeds with less likelihood of cavitation.

  7. Cascaded organic rankine cycles for waste heat utilization

    DOEpatents

    Radcliff, Thomas D [Vernon, CT; Biederman, Bruce P [West Hartford, CT; Brasz, Joost J [Fayetteville, NY

    2011-05-17

    A pair of organic Rankine cycle systems (20, 25) are combined and their respective organic working fluids are chosen such that the organic working fluid of the first organic Rankine cycle is condensed at a condensation temperature that is well above the boiling point of the organic working fluid of the second organic Rankine style system, and a single common heat exchanger (23) is used for both the condenser of the first organic Rankine cycle system and the evaporator of the second organic Rankine cycle system. A preferred organic working fluid of the first system is toluene and that of the second organic working fluid is R245fa.

  8. Energy recovery system using an organic rankine cycle

    DOEpatents

    Ernst, Timothy C

    2013-10-01

    A thermodynamic system for waste heat recovery, using an organic rankine cycle is provided which employs a single organic heat transferring fluid to recover heat energy from two waste heat streams having differing waste heat temperatures. Separate high and low temperature boilers provide high and low pressure vapor streams that are routed into an integrated turbine assembly having dual turbines mounted on a common shaft. Each turbine is appropriately sized for the pressure ratio of each stream.

  9. The study on working fluids of airborne power generation system based on Rankine cycle by heat energy

    NASA Astrophysics Data System (ADS)

    Guo, Yuan

    2017-05-01

    This paper proposed a new concept named airborne power generation system based on Rankine cycle by heat energy, namely, the presented system combined the Rankine cycle with environmental control system in aircraft to recycle the waste heat of engine bleed air with high temperature and generate power. This paper mainly discussed the choosing of optimum working fluid which could apply in the combined power generation system mentioned above when the temperature of the coming bleed air was about 400 degree centigrade.

  10. Technical and economic study of Stirling and Rankine cycle bottoming systems for heavy truck diesel engines

    NASA Technical Reports Server (NTRS)

    Kubo, I.

    1987-01-01

    Bottoming cycle concepts for heavy duty transport engine applications were studied. In particular, the following tasks were performed: (1) conceptual design and cost data development for Stirling systems; (2) life-cycle cost evaluation of three bottoming systems - organic Rankine, steam Rankine, and Stirling cycles; and (3) assessment of future directions in waste heat utilization research. Variables considered for the second task were initial capital investments, fuel savings, depreciation tax benefits, salvage values, and service/maintenance costs. The study shows that none of the three bottoming systems studied are even marginally attractive. Manufacturing costs have to be reduced by at least 65%. As a new approach, an integrated Rankine/Diesel system was proposed. It utilizes one of the diesel cylinders as an expander and capitalizes on the in-cylinder heat energy. The concept eliminates the need for the power transmission device and a sophisticated control system, and reduces the size of the exhaust evaporator. Results of an economic evaluation indicate that the system has the potential to become an attractive package for end users.

  11. The dish-Rankine SCSTPE program (Engineering Experiment no. 1). [systems engineering and economic analysis for a small community solar thermal electric system

    NASA Technical Reports Server (NTRS)

    Pons, R. L.; Grigsby, C. E.

    1980-01-01

    Activities planned for phase 2 Of the Small Community Solar Thermal Power Experiment (PFDR) program are summarized with emphasis on a dish-Rankine point focusing distributed receiver solar thermal electric system. Major design efforts include: (1) development of an advanced concept indirect-heated receiver;(2) development of hardware and software for a totally unmanned power plant control system; (3) implementation of a hybrid digital simulator which will validate plant operation prior to field testing; and (4) the acquisition of an efficient organic Rankine cycle power conversion unit. Preliminary performance analyses indicate that a mass-produced dish-Rankine PFDR system is potentially capable of producing electricity at a levelized busbar energy cost of 60 to 70 mills per KWh and with a capital cost of about $1300 per KW.

  12. System and method for regulating EGR cooling using a Rankine cycle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ernst, Timothy C.; Morris, Dave

    This disclosure relates to a waste heat recovery (WHR) system and method for regulating exhaust gas recirculation (EGR) cooling, and more particularly, to a Rankine cycle WHR system and method, including a recuperator bypass arrangement to regulate EGR exhaust gas cooling for engine efficiency improvement and thermal management. This disclosure describes other unique bypass arrangements for increased flexibility in the ability to regulate EGR exhaust gas cooling.

  13. System and method for regulating EGR cooling using a rankine cycle

    DOEpatents

    Ernst, Timothy C.; Morris, Dave

    2015-12-22

    This disclosure relates to a waste heat recovery (WHR) system and method for regulating exhaust gas recirculation (EGR) cooling, and more particularly, to a Rankine cycle WHR system and method, including a recuperator bypass arrangement to regulate EGR exhaust gas cooling for engine efficiency improvement and thermal management. This disclosure describes other unique bypass arrangements for increased flexibility in the ability to regulate EGR exhaust gas cooling.

  14. Potassium-Rankine Power Conversion Subsystem Modeling for Nuclear Electric Propulsion

    NASA Technical Reports Server (NTRS)

    Johnson, Gregory A.

    1993-01-01

    A potassium-Rankine power conversion system model was developed under Contract No. NAS3-25808 for the NASA-LeRC. This model predicts potassium-Rankine performance for turbine inlet temperatures (TIT) from 1200 - 1600 K, TIT to condenser temperature ratios from 1.25-1.6, power levels from 100 to 10,000 kWe, and lifetimes from 2-10 years. The model is for a Rankine cycle with reheat for turbine stage moisture control. The model assumes heat is supplied from a lithium heat transport loop. The model does not include a heat source or a condenser/heat rejection system model. These must be supplied by the user.

  15. Emissions-critical charge cooling using an organic rankine cycle

    DOEpatents

    Ernst, Timothy C.; Nelson, Christopher R.

    2014-07-15

    The disclosure provides a system including a Rankine power cycle cooling subsystem providing emissions-critical charge cooling of an input charge flow. The system includes a boiler fluidly coupled to the input charge flow, an energy conversion device fluidly coupled to the boiler, a condenser fluidly coupled to the energy conversion device, a pump fluidly coupled to the condenser and the boiler, an adjuster that adjusts at least one parameter of the Rankine power cycle subsystem to change a temperature of the input charge exiting the boiler, and a sensor adapted to sense a temperature characteristic of the vaporized input charge. The system includes a controller that can determine a target temperature of the input charge sufficient to meet or exceed predetermined target emissions and cause the adjuster to adjust at least one parameter of the Rankine power cycle to achieve the predetermined target emissions.

  16. Effects of low-pressure air on oxygen contamination and lithium corrosion of a tantalum alloy, T-111, at 980 and 1260 C

    NASA Technical Reports Server (NTRS)

    Gahn, R. F.

    1974-01-01

    The effects were studied of low-pressure air on contamination and corrosion in the tantalum alloy T-111/lithium system at 980 and 1260 C. Capsules of T-111 containing lithium were exposed to six vacuum levels between 1 x 10 to the 8th power and 0.0003 torr by controlled air leakage into a vacuum system. Capsules exposed at 980 C and 0.0002 torr failed from intragranular oxidation. The remainder of the capsules completed the 96-hour tests. The depth of oxygen contamination was greater at 980 C than at 1260 C. Tests made at 0.0001 and 0.00001 torr levels caused large increases in the oxygen content of the T-111. Tests at 0.000001 torr or less produced no significant contamination. No lithium corrosion of the T-111 was observed under any of the conditions.

  17. Evaluation of Rankine cycle air conditioning system hardware by computer simulation

    NASA Technical Reports Server (NTRS)

    Healey, H. M.; Clark, D.

    1978-01-01

    A computer program for simulating the performance of a variety of solar powered Rankine cycle air conditioning system components (RCACS) has been developed. The computer program models actual equipment by developing performance maps from manufacturers data and is capable of simulating off-design operation of the RCACS components. The program designed to be a subroutine of the Marshall Space Flight Center (MSFC) Solar Energy System Analysis Computer Program 'SOLRAD', is a complete package suitable for use by an occasional computer user in developing performance maps of heating, ventilation and air conditioning components.

  18. Preliminary design package for residential heating/cooling system: Rankine air conditioner redesign

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A summary of the preliminary redesign and development of a marketable single family heating and cooling system is presented. The interim design and schedule status of the residential (3-ton) redesign, problem areas and solutions, and the definition of plans for future design and development activities were discussed. The proposed system for a single-family residential heating and cooling system is a single-loop, solar-assisted, hydronic-to-warm-air heating subsystem with solar-assisted domestic water heating and a Rankine-driven expansion air-conditioning subsystem.

  19. Dual-objective optimization of organic Rankine cycle (ORC) systems using genetic algorithm: a comparison between basic and recuperative cycles

    NASA Astrophysics Data System (ADS)

    Hayat, Nasir; Ameen, Muhammad Tahir; Tariq, Muhammad Kashif; Shah, Syed Nadeem Abbas; Naveed, Ahmad

    2017-08-01

    Exploitation of low potential waste thermal energy for useful net power output can be done by manipulating organic Rankine cycle systems. In the current article dual-objectives (η_{th} and SIC) optimization of ORC systems [basic organic Rankine cycle (BORC) and recuperative organic Rankine cycle (RORC)] has been done using non-dominated sorting genetic algorithm (II). Seven organic compounds (R-123, R-1234ze, R-152a, R-21, R-236ea, R-245ca and R-601) have been employed in basic cycle and four dry compounds (R-123, R-236ea, R-245ca and R-601) have been employed in recuperative cycle to investigate the behaviour of two systems and compare their performance. Sensitivity analyses show that recuperation boosts the thermodynamic behaviour of systems but it also raises specific investment cost significantly. R-21, R-245ca and R-601 show attractive performance in BORC whereas R-601 and R-236ea in RORC. RORC, due to higher total investment cost and operation & maintenance costs, has longer payback periods as compared to BORC.

  20. Study of toluene stability for an Organic Rankine Cycle (ORC) space-based power system

    NASA Technical Reports Server (NTRS)

    Havens, Vance; Ragaller, Dana

    1988-01-01

    The design, fabrication, assembly, and endurance operation of a dynamic test loop, built to evaluate the thermal stability of a proposed Organic Rankine Cycle (ORC) working fluid, is discussed. The test fluid, toluene, was circulated through a heater, simulated turbine, regenerator, condenser and pump to duplicate an actual ORC system. The maximum nominal fluid temperature, 750 F, was at the turbine simulator inlet. Samples of noncondensible gases and liquid toluene were taken periodically during the test. The samples were analyzed to identify the degradation products formed and the quantity of these products. From these data it was possible to determine the degradation rate of the working fluid and the generation rate of noncondensible gases. A further goal of this work was to relate the degradation observed in the dynamic operating loop to degradation obtained in isothermal capsule tests. This relationship was the basis for estimating the power loop degradation in the Space Station Organic Rankine Cycle system.

  1. Advanced Rankine and Brayton cycle power systems - Materials needs and opportunities

    NASA Technical Reports Server (NTRS)

    Grisaffe, S. J.; Guentert, D. C.

    1974-01-01

    Conceptual advanced potassium Rankine and closed Brayton power conversion cycles offer the potential for improved efficiency over steam systems through higher operating temperatures. However, for utility service of at least 100,000 hours, materials technology advances will be needed for such high temperature systems. Improved alloys and surface protection must be developed and demonstrated to resist coal combustion gases as well as potassium corrosion or helium surface degradation at high temperatures. Extensions in fabrication technology are necessary to produce large components of high temperature alloys. Long-time property data must be obtained under environments of interest to assure high component reliability.

  2. Advanced Rankine and Brayton cycle power systems: Materials needs and opportunities

    NASA Technical Reports Server (NTRS)

    Grisaffe, S. J.; Guentert, D. C.

    1974-01-01

    Conceptual advanced potassium Rankine and closed Brayton power conversion cycles offer the potential for improved efficiency over steam systems through higher operating temperatures. However, for utility service of at least 100,000 hours, materials technology advances will be needed for such high temperature systems. Improved alloys and surface protection must be developed and demonstrated to resist coal combustion gases as well as potassium corrosion or helium surface degradation at high temperatures. Extensions in fabrication technology are necessary to produce large components of high temperature alloys. Long time property data must be obtained under environments of interest to assure high component reliability.

  3. The SCSTPE organic Rankine engine

    NASA Technical Reports Server (NTRS)

    Boda, F. P.

    1980-01-01

    The organic Rankine cycle engine under consideration for a solar thermal system being developed is described. Design parameters, method of control, performance and cost data are provided for engine power levels up to 80 kWe; efficiency is shown as a function of turbine inlet temperature in the range of 149 C to 427 C.

  4. 46 CFR 111.05-25 - Ungrounded systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-25 Ungrounded systems. Each ungrounded system must be provided with a suitably sensitive ground detection system located at the... 46 Shipping 4 2010-10-01 2010-10-01 false Ungrounded systems. 111.05-25 Section 111.05-25 Shipping...

  5. 46 CFR 111.05-25 - Ungrounded systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Ungrounded systems. 111.05-25 Section 111.05-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-25 Ungrounded systems. Each...

  6. 46 CFR 111.05-25 - Ungrounded systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Ungrounded systems. 111.05-25 Section 111.05-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-25 Ungrounded systems. Each...

  7. 46 CFR 111.05-25 - Ungrounded systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Ungrounded systems. 111.05-25 Section 111.05-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-25 Ungrounded systems. Each...

  8. 46 CFR 111.105-5 - System integrity.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false System integrity. 111.105-5 Section 111.105-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-5 System integrity. In order to maintain system integrity, each...

  9. 46 CFR 111.105-5 - System integrity.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false System integrity. 111.105-5 Section 111.105-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-5 System integrity. In order to maintain system integrity, each...

  10. 46 CFR 111.105-5 - System integrity.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false System integrity. 111.105-5 Section 111.105-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-5 System integrity. In order to maintain system integrity, each...

  11. 46 CFR 111.107-1 - Industrial systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Industrial systems. 111.107-1 Section 111.107-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Industrial Systems § 111.107-1 Industrial systems. (a) For the purpose of this subpart, an...

  12. 46 CFR 111.107-1 - Industrial systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Industrial systems. 111.107-1 Section 111.107-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Industrial Systems § 111.107-1 Industrial systems. (a) For the purpose of this subpart, an...

  13. 46 CFR 111.107-1 - Industrial systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Industrial systems. 111.107-1 Section 111.107-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Industrial Systems § 111.107-1 Industrial systems. (a) For the purpose of this subpart, an...

  14. 46 CFR 111.107-1 - Industrial systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Industrial systems. 111.107-1 Section 111.107-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Industrial Systems § 111.107-1 Industrial systems. (a) For the purpose of this subpart, an...

  15. 46 CFR 111.107-1 - Industrial systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Industrial systems. 111.107-1 Section 111.107-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Industrial Systems § 111.107-1 Industrial systems. (a) For the purpose of this subpart, an...

  16. 46 CFR 111.33-11 - Propulsion systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Propulsion systems. 111.33-11 Section 111.33-11 Shipping... REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-11 Propulsion systems. Each power semiconductor rectifier system in a propulsion system must meet sections 4-8-5/5.17.9 and 4-8-5/5.17.10 of ABS Steel...

  17. 46 CFR 111.33-11 - Propulsion systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Propulsion systems. 111.33-11 Section 111.33-11 Shipping... REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-11 Propulsion systems. Each power semiconductor rectifier system in a propulsion system must meet sections 4-8-5/5.17.9 and 4-8-5/5.17.10 of ABS Steel...

  18. 46 CFR 111.33-11 - Propulsion systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Propulsion systems. 111.33-11 Section 111.33-11 Shipping... REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-11 Propulsion systems. Each power semiconductor rectifier system in a propulsion system must meet sections 4-8-5/5.17.9 and 4-8-5/5.17.10 of ABS Steel...

  19. 46 CFR 111.33-11 - Propulsion systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Propulsion systems. 111.33-11 Section 111.33-11 Shipping... REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-11 Propulsion systems. Each power semiconductor rectifier system in a propulsion system must meet sections 4-8-5/5.17.9 and 4-8-5/5.17.10 of ABS Steel...

  20. 46 CFR 111.33-11 - Propulsion systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Propulsion systems. 111.33-11 Section 111.33-11 Shipping... REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-11 Propulsion systems. Each power semiconductor rectifier system in a propulsion system must meet sections 4-8-5/5.17.9 and 4-8-5/5.17.10 of ABS Steel...

  1. 46 CFR 111.50-2 - Systems integration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Systems integration. 111.50-2 Section 111.50-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each...

  2. Organic Rankine Kilowatt Isotope Power System. Final phase I report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-07-15

    On 1 August 1975 under Department of Energy Contract EN-77-C-02-4299, Sundstrand Energy Systems commenced development of a Kilowatt Isotope Power System (KIPS) directed toward satisfying the higher power requirements of satellites of the 1980s and beyond. The KIPS is a /sup 238/PuO/sub 2/ fueled organic Rankine cycle turbine power system which will provide design output power in the range of 500 to 2000 W/sub (e)/ with a minimum of system changes. The principal objectives of the Phase 1 development effort were to: conceptually design a flight system; design a Ground Demonstration System (GDS) that is prototypic of the flight systemmore » in order to prove the feasibility of the flight system design; fabricate and assemble the GDS; and performance and endurance test the GDS using electric heaters in lieu of the isotope heat source. Results of the work performed under the Phase 1 contract to 1 July 1978 are presented.« less

  3. Research in Support of the Use of Rankine Cycle Energy Conversion Systems for Space Power and Propulsion

    NASA Technical Reports Server (NTRS)

    Lahey, Richard T., Jr.; Dhir, Vijay

    2004-01-01

    This is the report of a Scientific Working Group (SWG) formed by NASA to determine the feasibility of using a liquid metal cooled nuclear reactor and Rankine energy conversion cycle for dual purpose power and propulsion in space. This is a high level technical report which is intended for use by NASA management in program planning. The SWG was composed of a team of specialists in nuclear energy and multiphase flow and heat transfer technology from academia, national laboratories, NASA and industry. The SWG has identified the key technology issues that need to be addressed and have recommended an integrated short term (approx. 2 years) and a long term (approx. 10 year) research and development (R&D) program to qualify a Rankine cycle power plant for use in space. This research is ultimately intended to give NASA and its contractors the ability to reliably predict both steady and transient multiphase flow and heat transfer phenomena at reduced gravity, so they can analyze and optimize designs and scale-up experimental data on Rankine cycle components and systems. In addition, some of these results should also be useful for the analysis and design of various multiphase life support and thermal management systems being considered by NASA.

  4. Effects of alloy composition in alleviating embrittlement problems associated with the tantalum alloy T-111

    NASA Technical Reports Server (NTRS)

    Stephens, J. R.

    1975-01-01

    The causes of aging embrittlement in T-111 (Ta-8W-2Hf) and the effect of alloy modification were investigated. Results show that T-111 possesses a critical combination of tungsten and hafnium that leads to loss in ductility at -196 C after aging near 1040 C. It was found that this occurs because tungsten enhances hafnium segregation to grain boundaries, which also leads to increased susceptibility to hydrogen embrittlement. Aging embrittlement was not observed in tantalum alloys with reduced tungsten or hafnium contents; most of the alloys studied have lower strengths than T-111 and exhibit susceptibility to hydrogen embrittlement.

  5. Influence of restraint and thermal exposure on welds in T-111 and ASTAR-811C

    NASA Technical Reports Server (NTRS)

    Gold, R. E.; Lessmann, G. G.

    1971-01-01

    The notched-tensile, tensile, and bend properties of GTA welds in T-111 and ASTAR-811C sheet were determined following a wide range of thermal exposures in order to define changes in ductility and mechanical property behavior due to weld aging response. No notch sensitivity or unusual tensile response was noted for any of the conditions evaluated. An aging response was noted for the bend ductile-brittle transition temperature determinations on both T-111 and ASTAR-811C welds. A tentative explanation for the observed response of each alloy is presented. In addition, the interrelationship of mechanical and chemical factors leading to underbead cracking in T-111 was investigated. The problem was shown to be amenable primarily to chemical solutions, such as alloy compositional changes. This was demonstrated by the improved performance of ASTAR-811C over T-111 in plate weld studies. Only modest success was achieved using procedural techniques as a means of eliminating underbead cracking.

  6. Optimization of automotive Rankine cycle waste heat recovery under various engine operating condition

    NASA Astrophysics Data System (ADS)

    Punov, Plamen; Milkov, Nikolay; Danel, Quentin; Perilhon, Christelle; Podevin, Pierre; Evtimov, Teodossi

    2017-02-01

    An optimization study of the Rankine cycle as a function of diesel engine operating mode is presented. The Rankine cycle here, is studied as a waste heat recovery system which uses the engine exhaust gases as heat source. The engine exhaust gases parameters (temperature, mass flow and composition) were defined by means of numerical simulation in advanced simulation software AVL Boost. Previously, the engine simulation model was validated and the Vibe function parameters were defined as a function of engine load. The Rankine cycle output power and efficiency was numerically estimated by means of a simulation code in Python(x,y). This code includes discretized heat exchanger model and simplified model of the pump and the expander based on their isentropic efficiency. The Rankine cycle simulation revealed the optimum value of working fluid mass flow and evaporation pressure according to the heat source. Thus, the optimal Rankine cycle performance was obtained over the engine operating map.

  7. 33 CFR 127.111 - Communications systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Communications systems. 127.111... Waterfront Facilities Handling Liquefied Natural Gas § 127.111 Communications systems. (a) The marine transfer area for LNG must have a ship-to-shore communication system and a separate emergency ship-to-shore...

  8. 33 CFR 127.111 - Communications systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Communications systems. 127.111... Waterfront Facilities Handling Liquefied Natural Gas § 127.111 Communications systems. (a) The marine transfer area for LNG must have a ship-to-shore communication system and a separate emergency ship-to-shore...

  9. 33 CFR 127.111 - Communications systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Communications systems. 127.111... Waterfront Facilities Handling Liquefied Natural Gas § 127.111 Communications systems. (a) The marine transfer area for LNG must have a ship-to-shore communication system and a separate emergency ship-to-shore...

  10. 33 CFR 127.111 - Communications systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Communications systems. 127.111... Waterfront Facilities Handling Liquefied Natural Gas § 127.111 Communications systems. (a) The marine transfer area for LNG must have a ship-to-shore communication system and a separate emergency ship-to-shore...

  11. 33 CFR 127.111 - Communications systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Communications systems. 127.111... Waterfront Facilities Handling Liquefied Natural Gas § 127.111 Communications systems. (a) The marine transfer area for LNG must have a ship-to-shore communication system and a separate emergency ship-to-shore...

  12. Thermal energy storage for organic Rankine cycle solar dynamic space power systems

    NASA Astrophysics Data System (ADS)

    Heidenreich, G. R.; Parekh, M. B.

    An organic Rankine cycle-solar dynamic power system (ORC-SDPS) comprises a concentrator, a radiator, a power conversion unit, and a receiver with a thermal energy storage (TES) subsystem which charges and discharges energy to meet power demands during orbital insolation and eclipse periods. Attention is presently given to the criteria used in designing and evaluating an ORC-SDPS TES, as well as the automated test facility employed. It is found that a substantial data base exists for the design of an ORC-SDPS TES subsystem.

  13. Toluene stability Space Station Rankine power system

    NASA Technical Reports Server (NTRS)

    Havens, V. N.; Ragaller, D. R.; Sibert, L.; Miller, D.

    1987-01-01

    A dynamic test loop is designed to evaluate the thermal stability of an organic Rankine cycle working fluid, toluene, for potential application to the Space Station power conversion unit. Samples of the noncondensible gases and the liquid toluene were taken periodically during the 3410 hour test at 750 F peak temperature. The results obtained from the toluene stability loop verify that toluene degradation will not lead to a loss of performance over the 30-year Space Station mission life requirement. The identity of the degradation products and the low rates of formation were as expected from toluene capsule test data.

  14. A Feasibility Study of CO2-Based Rankine Cycle Powered by Solar Energy

    NASA Astrophysics Data System (ADS)

    Zhang, Xin-Rong; Yamaguchi, Hiroshi; Fujima, Katsumi; Enomoto, Masatoshi; Sawada, Noboru

    An experiment study was carried out in order to investigate feasibility of CO2-based Rankine cycle powered by solar energy. The proposed cycle is to achieve a cogeneration of heat and power, which consists of evacuated solar tube collectors, power generating turbine, heat recovery system, and feed pump. The Rankine cycle of the system utilizes solar collectors to convert CO2 into high-temperature supercritical state, used to drive a turbine and produce electrical power. The cycle also recovers thermal energy, which can be used for absorption refrigerator, air conditioning, hot water supply so on for a building. A set of experimental set-up was constructed to investigate the performance of the CO2-based Rankine cycle. The results show the cycle can achieve production of heat and power with reasonable thermodynamics efficiency and has a great potential of the application of the CO2-based Rankine cycle powered by solar energy. In addition, some research interests related to the present study will also be discussed in this paper.

  15. 46 CFR 111.50-2 - Systems integration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...

  16. 46 CFR 111.50-2 - Systems integration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...

  17. 46 CFR 111.50-2 - Systems integration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...

  18. 46 CFR 111.50-2 - Systems integration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...

  19. 23 CFR 470.111 - Interstate System procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... System, have the affirmative recommendation of the State or States involved, and have the written... 23 Highways 1 2010-04-01 2010-04-01 false Interstate System procedures. 470.111 Section 470.111 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS...

  20. Materials technology programs in support of a mercury Rankine space power system

    NASA Technical Reports Server (NTRS)

    Stone, P. L.

    1973-01-01

    A large portion of the materials technology is summarized that was generated in support of the development of a mercury-rankine space power system (SNAP-8). The primary areas of investigation are: (1) the compatibility of various construction materials with the liquid metals mercury and NaK, (2) the mechanical properties of unalloyed tantalum, and (3) the development of refractory metal/austenitic stainless steel tubing and transition joints. The primary results, conclusions, and state of technology at the completion of this effort for each of these areas are summarized. Results of possible significance to other applications are highlighted.

  1. 46 CFR 111.105-5 - System integrity.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false System integrity. 111.105-5 Section 111.105-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... individual electrical installation in a hazardous location must comply specifically with Articles 500-505 of...

  2. 46 CFR 111.52-3 - Systems below 1500 kilowatts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Systems below 1500 kilowatts. 111.52-3 Section 111.52-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-3 Systems below 1500 kilowatts. The...

  3. 46 CFR 111.52-3 - Systems below 1500 kilowatts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Systems below 1500 kilowatts. 111.52-3 Section 111.52-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-3 Systems below 1500 kilowatts. The...

  4. Exergy analysis of biomass organic Rankine cycle for power generation

    NASA Astrophysics Data System (ADS)

    Nur, T. B.; Sunoto

    2018-02-01

    The study examines proposed small biomass-fed Organic Rankine Cycle (ORC) power plant through exergy analysis. The system consists of combustion burner unit to utilize biomass as fuel, and organic Rankine cycle unit to produce power from the expander. The heat from combustion burner was transfered by thermal oil heater to evaporate ORC working fluid in the evaporator part. The effects of adding recuperator into exergy destruction were investigated. Furthermore, the results of the variations of system configurations with different operating parameters, such as the evaporating pressures, ambient temperatures, and expander pressures were analyzed. It was found that the largest exergy destruction occurs during processes are at combustion part, followed by evaporator, condenser, expander, and pump. The ORC system equipped with a recuperator unit exhibited good operational characteristics under wide range conditions compared to the one without recuperator.

  5. Metallurgical evaluation of factors influencing the ductility of aged T-111

    NASA Technical Reports Server (NTRS)

    Gold, R. E.

    1972-01-01

    The metallurgical factors influencing the ductility of T-111 (Ta-8W-2Hf) alloy following long-time exposures of GTA welds and tubing in the temperature range 982 C (1800 F) through 1316 C (2400 F) were evaluated by means of scanning and transmission electron microscopy, Auger electron emission spectroscopy, and optical metallographic procedures. No classical aging response occurs in the alloy over the temperature range studied. The ductility impairment implied by previous investigations is not the result of microstructural response of the alloy to thermal exposures. Intergranular failure in the GTA sheet welds appears the result of random contamination by silicon, potassium, and/or fluorine at the grain boundaries of the fusion zones. Exposure to lithium at high temperatures had no adverse effects on the ductility of T-111 tubing. These materials were, however, sensitive to post-age handling and testing procedures.

  6. Solar thermal organic rankine cycle for micro-generation

    NASA Astrophysics Data System (ADS)

    Alkahli, N. A.; Abdullah, H.; Darus, A. N.; Jalaludin, A. F.

    2012-06-01

    The conceptual design of an Organic Rankine Cycle (ORC) driven by solar thermal energy is developed for the decentralized production of electricity of up to 50 kW. Conventional Rankine Cycle uses water as the working fluid whereas ORC uses organic compound as the working fluid and it is particularly suitable for low temperature applications. The ORC and the solar collector will be sized according to the solar flux distribution in the Republic of Yemen for the required power output of 50 kW. This will be a micro power generation system that consists of two cycles, the solar thermal cycle that harness solar energy and the power cycle, which is the ORC that generates electricity. As for the solar thermal cycle, heat transfer fluid (HTF) circulates the cycle while absorbing thermal energy from the sun through a parabolic trough collector and then storing it in a thermal storage to increase system efficiency and maintains system operation during low radiation. The heat is then transferred to the organic fluid in the ORC via a heat exchanger. The organic fluids to be used and analyzed in the ORC are hydrocarbons R600a and R290.

  7. Effect of aging at 1040 C (1900 F) on the ductility and structure of a tantalum alloy, T-111

    NASA Technical Reports Server (NTRS)

    Watson, G. K.; Stephens, J. R.

    1972-01-01

    The post-aging embrittlement of T-111 (tantalum - 8-percent tungsten - 2-percent hafnium) following exposure for up to about 10,000 hours at 1040 C in either vacuum or liquid lithium was investigated for sheet and tubing samples. This thermal aging was shown to greatly increase the sensitivity of T-111 to hydrogen embrittlement during subsequent room temperature specimen processing or testing. The hydrogen embrittlement problem can be avoided by preventing exposure to the T-111 to moisture during post-aging processing or testing. Aging at 1040 C also resulted in formation of HfO2 particles at grain boundaries, which may contribute to the observed embrittlement.

  8. Dissolution kinetics of small amounts of oxygen in tantalum alloy T-111 and internal oxide displacement reactions during annealing

    NASA Technical Reports Server (NTRS)

    Stecura, S.

    1976-01-01

    Oxygen was added to T-111 (Ta-8W-2Hf, wt. %) at 820 and 990 C at an oxygen pressure of about 0.0003 torr. The technique employed permitted predetermined and reproducible doping of T-111 up to 3.0 at. % oxygen. Based on the temperature dependence of the doping reaction, it is concluded that the initial rates of oxygen pickup are probably controlled by solution of oxygen into the T-111 lattice. Although hafnium oxides are more stable than those of tantalum or tungsten, analyses of extracted residues indicate that the latter oxides predominate in the as-doped specimens, presumably because of the higher concentrations of tantalum and tungsten in the alloy. However, high-temperature annealing promotes gettering of dissolved oxygen and of other oxides to form hafnium oxides. Small amounts of tantalum and tungsten oxides were still present after high-temperature annealing. Tungsten oxide (WO3) volatilizes slightly from the surface of T-111 at 990 C. The vaporization of WO3 has no apparent affect on the doping reaction.

  9. 46 CFR 111.05-31 - Grounding conductors for systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Grounding conductors for systems. 111.05-31 Section 111... Grounding conductors for systems. (a) A conductor for grounding a direct-current system must be the larger of: (1) The largest conductor supplying the system; or (2) No. 8 AWG (8.4mm2). (b) A conductor for...

  10. 46 CFR 111.05-31 - Grounding conductors for systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Grounding conductors for systems. 111.05-31 Section 111... Grounding conductors for systems. (a) A conductor for grounding a direct-current system must be the larger of: (1) The largest conductor supplying the system; or (2) No. 8 AWG (8.4mm2). (b) A conductor for...

  11. Addition of oxygen to and distribution of oxides in tantalum alloy T-111 at low concentrations

    NASA Technical Reports Server (NTRS)

    Stecura, S.

    1975-01-01

    Oxygen was added at 820 and 990 C at an oxygen pressure of about .0003 torr. The technique permitted predetermined and reproducible oxygen doping of the tantalum alloy (T-111). Based on the temperature dependency of the doping reaction, it was concluded that the initial rates of oxygen pickup are probably controlled by solution of oxygen into the T-111 lattice. Although hafnium oxides are more stable than those of tantalum or tungsten, analyses of extracted residues indicate that the tantalum and tungsten oxides predominate in the as-doped specimens, presumably because of the higher concentrations of tantalum and tungsten in the alloy. However, high-temperature annealing promotes gettering of dissolved oxygen and oxygen from other oxides to form hafnium oxides. Small amounts of tantalum and tungsten oxides were still present after high temperature annealing. Tungsten oxide (WO3) volatilizes slightly from the surface of T-111 at 990 C but not at 820 C. The vaporization of WO3 has no apparent effect on the doping reaction.

  12. Low-grade geothermal energy conversion by organic Rankine cycle turbine generator

    NASA Astrophysics Data System (ADS)

    Zarling, J. P.; Aspnes, J. D.

    Results of a demonstration project which helped determine the feasibility of converting low-grade thermal energy in 49 C water into electrical energy via an organic Rankine cycle 2500 watt (electrical) turbine-generator are presented. The geothermal source which supplied the water is located in a rural Alaskan village. The reasons an organic Rankine cycle turbine-generator was investigated as a possible source of electric power in rural Alaska are: (1) high cost of operating diesel-electric units and their poor long-term reliability when high-quality maintenance is unavailable and (2) the extremely high level of long-term reliability reportedly attained by commercially available organic Rankine cycle turbines. Data is provided on the thermal and electrical operating characteristics of an experimental organic Rankine cycle turbine-generator operating at a uniquely low vaporizer temperature.

  13. Potassium Rankine cycle vapor chamber (heat pipe) radiator study

    NASA Technical Reports Server (NTRS)

    Gerrels, E. E.; Killen, R. E.

    1971-01-01

    A structurally integrated vapor chamber fin (heat pipe) radiator is defined and evaluated as a potential candidate for rejecting waste heat from the potassium Rankine cycle powerplant. Several vapor chamber fin geometries, using stainless steel construction, are evaluated and an optimum is selected. A comparison is made with an operationally equivalent conduction fin radiator. Both radiators employ NaK-78 in the primary coolant loop. In addition, the Vapor Chamber Fin (VCF) radiator utilizes sodium in the vapor chambers. Preliminary designs are developed for the conduction fin and VCF concepts. Performance tests on a single vapor chamber were conducted to verify the VCF design. A comparison shows the conduction fin radiator easier to fabricate, but heavier in weight, particularly as meteoroid protection requirements become more stringent. While the analysis was performed assuming the potassium Rankine cycle powerplant, the results are equally applicable to any system radiating heat to space in the 900 to 1400 F temperature range.

  14. Thermodynamic Analysis of a Rankine Cycle Powered Vapor Compression Ice Maker Using Solar Energy

    PubMed Central

    Hu, Bing; Bu, Xianbiao; Ma, Weibin

    2014-01-01

    To develop the organic Rankine-vapor compression ice maker driven by solar energy, a thermodynamic model was developed and the effects of generation temperature, condensation temperature, and working fluid types on the system performance were analyzed. The results show that the cooling power per square meter collector and ice production per square meter collector per day depend largely on generation temperature and condensation temperature and they increase firstly and then decrease with increasing generation temperature. For every working fluid there is an optimal generation temperature at which organic Rankine efficiency achieves the maximum value. The cooling power per square meter collector and ice production per square meter collector per day are, respectively, 126.44 W m−2 and 7.61 kg m−2 day−1 at the generation temperature of 140°C for working fluid of R245fa, which demonstrates the feasibility of organic Rankine cycle powered vapor compression ice maker. PMID:25202735

  15. The 15 kW sub e (nominal) solar thermal electric power conversion concept definition study: Steam Rankine turbine system

    NASA Technical Reports Server (NTRS)

    Bland, T. J.

    1979-01-01

    A study to define the performance and cost characteristics of a solar powered, steam Rankine turbine system located at the focal point of a solar concentrator is presented. A two stage re-entry turbine with reheat between stages, which has an efficiency of 27% at a turbine inlet temperature of 732 C was used. System efficiency was defined as 60 Hertz electrical output divided by absorbed thermal input in the working fluid. Mass production costs were found to be approximately 364 dollars/KW.

  16. 14 CFR 121.1500 - SFAR No. 111-Lavatory Oxygen Systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false SFAR No. 111-Lavatory Oxygen Systems. 121... § 121.1500 SFAR No. 111—Lavatory Oxygen Systems. (a) Applicability. This SFAR applies to the following... disabled lavatory oxygen systems, modified in accordance with FAA Airworthiness Directive 2011-04-09...

  17. Preliminary analysis of compound systems based on high temperature fuel cell, gas turbine and Organic Rankine Cycle

    NASA Astrophysics Data System (ADS)

    Sánchez, D.; Muñoz de Escalona, J. M.; Monje, B.; Chacartegui, R.; Sánchez, T.

    This article presents a novel proposal for complex hybrid systems comprising high temperature fuel cells and thermal engines. In this case, the system is composed by a molten carbonate fuel cell with cascaded hot air turbine and Organic Rankine Cycle (ORC), a layout that is based on subsequent waste heat recovery for additional power production. The work will credit that it is possible to achieve 60% efficiency even if the fuel cell operates at atmospheric pressure. The first part of the analysis focuses on selecting the working fluid of the Organic Rankine Cycle. After a thermodynamic optimisation, toluene turns out to be the most efficient fluid in terms of cycle performance. However, it is also detected that the performance of the heat recovery vapour generator is equally important, what makes R245fa be the most interesting fluid due to its balanced thermal and HRVG efficiencies that yield the highest global bottoming cycle efficiency. When this fluid is employed in the compound system, conservative operating conditions permit achieving 60% global system efficiency, therefore accomplishing the initial objective set up in the work. A simultaneous optimisation of gas turbine (pressure ratio) and ORC (live vapour pressure) is then presented, to check if the previous results are improved or if the fluid of choice must be replaced. Eventually, even if system performance improves for some fluids, it is concluded that (i) R245fa is the most efficient fluid and (ii) the operating conditions considered in the previous analysis are still valid. The work concludes with an assessment about safety-related aspects of using hydrocarbons in the system. Flammability is studied, showing that R245fa is the most interesting fluid also in this regard due to its inert behaviour, as opposed to the other fluids under consideration all of which are highly flammable.

  18. 46 CFR 111.05-17 - Generation and distribution system grounding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 111.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-17... must: (a) Be grounded at the generator switchboard, except the neutral of an emergency power generation...

  19. 46 CFR 111.05-17 - Generation and distribution system grounding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 111.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-17... must: (a) Be grounded at the generator switchboard, except the neutral of an emergency power generation...

  20. 46 CFR 111.05-17 - Generation and distribution system grounding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 111.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-17... must: (a) Be grounded at the generator switchboard, except the neutral of an emergency power generation...

  1. Study of toluene rotary fluid management device and shear flow condenser performance for a space-based organic Rankine power system

    NASA Technical Reports Server (NTRS)

    Havens, Vance; Ragaller, Dana

    1988-01-01

    Management of two-phase fluid and control of the heat transfer process in microgravity is a technical challenge that must be addressed for an orbital Organic Rankine Cycle (ORC) application. A test program was performed in 1-g that satisfactorily demonstrated the two-phase management capability of the rotating fluid management device (RFMD) and shear-flow condenser. Operational tests of the RFMD and shear flow condenser in adverse gravity orientations, confirmed that the centrifugal forces in the RFMD and the shear forces in the condenser were capable of overcoming gravity forces. In a microgravity environment, these same forces would not have to compete against gravity and would therefore be dominant. The specific test program covered the required operating range of the Space Station Solar Dynamic Rankine Cycle power system. Review of the test data verified that: fluid was pumped from the RFMD in all attitudes; subcooled states in the condenser were achieved; condensate was pushed uphill against gravity; and noncondensible gases were swept through the condenser.

  2. 14 CFR 129.201 - SFAR No. 111-Lavatory Oxygen Systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false SFAR No. 111-Lavatory Oxygen Systems. 129.201 Section 129.201 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Special Federal Aviation Regulations § 129.201 SFAR No. 111—Lavatory Oxygen Systems. The requirements of...

  3. 14 CFR 129.201 - SFAR No. 111-Lavatory Oxygen Systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false SFAR No. 111-Lavatory Oxygen Systems. 129.201 Section 129.201 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Special Federal Aviation Regulations § 129.201 SFAR No. 111—Lavatory Oxygen Systems. The requirements of...

  4. 14 CFR 129.201 - SFAR No. 111-Lavatory Oxygen Systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false SFAR No. 111-Lavatory Oxygen Systems. 129.201 Section 129.201 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Special Federal Aviation Regulations § 129.201 SFAR No. 111—Lavatory Oxygen Systems. The requirements of...

  5. 14 CFR 21.700 - SFAR No. 111-Lavatory Oxygen Systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false SFAR No. 111-Lavatory Oxygen Systems. 21.700 Section 21.700 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... No. 111—Lavatory Oxygen Systems. The requirements of § 121.1500 of this chapter also apply to this...

  6. 14 CFR 25.1801 - SFAR No. 111-Lavatory Oxygen Systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false SFAR No. 111-Lavatory Oxygen Systems. 25.1801 Section 25.1801 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Regulations § 25.1801 SFAR No. 111—Lavatory Oxygen Systems. The requirements of § 121.1500 of this chapter...

  7. 14 CFR 21.700 - SFAR No. 111-Lavatory Oxygen Systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false SFAR No. 111-Lavatory Oxygen Systems. 21.700 Section 21.700 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... No. 111—Lavatory Oxygen Systems. The requirements of § 121.1500 of this chapter also apply to this...

  8. 14 CFR 21.700 - SFAR No. 111-Lavatory Oxygen Systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false SFAR No. 111-Lavatory Oxygen Systems. 21.700 Section 21.700 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... No. 111—Lavatory Oxygen Systems. The requirements of § 121.1500 of this chapter also apply to this...

  9. 14 CFR 25.1801 - SFAR No. 111-Lavatory Oxygen Systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false SFAR No. 111-Lavatory Oxygen Systems. 25.1801 Section 25.1801 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Regulations § 25.1801 SFAR No. 111—Lavatory Oxygen Systems. The requirements of § 121.1500 of this chapter...

  10. 14 CFR 25.1801 - SFAR No. 111-Lavatory Oxygen Systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false SFAR No. 111-Lavatory Oxygen Systems. 25.1801 Section 25.1801 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Regulations § 25.1801 SFAR No. 111—Lavatory Oxygen Systems. The requirements of § 121.1500 of this chapter...

  11. An RC-1 organic Rankine bottoming cycle for an adiabatic diesel engine

    NASA Technical Reports Server (NTRS)

    Dinanno, L. R.; Dibella, F. A.; Koplow, M. D.

    1983-01-01

    A system analysis and preliminary design were conducted for an organic Rankine-cycle system to bottom the high-temperature waste heat of an adiabatic diesel engine. The bottoming cycle is a compact package that includes a cylindrical air cooled condenser regenerator module and other unique features. The bottoming cycle output is 56 horsepower at design point conditions when compounding the reference 317 horsepower turbocharged diesel engine with a resulting brake specific fuel consumption of 0.268 lb/hp-hr for the compound engine. The bottoming cycle when applied to a turbocompound diesel delivers a compound engine brake specific fuel consumption of 0.258 lb/hp-hr. This system for heavy duty transport applications uses the organic working fluid RC-1, which is a mixture of 60 mole percent pentafluorobenzene and 40 mole percent hexafluorobenzene. The thermal stability of the RC-1 organic fluid was tested in a dynamic fluid test loop that simulates the operation of Rankine-cycle. More than 1600 hours of operation were completed with results showing that the RC-1 is thermally stable up to 900 F.

  12. The design of components for an advanced Rankine cycle test facility.

    NASA Technical Reports Server (NTRS)

    Bond, J. A.

    1972-01-01

    The design of a facility for testing components of an advanced Rankine cycle power system is summarized. The facility is a three-loop system in which lithium, potassium and NaK-78 are the working fluids of the primary, secondary and heat-rejection loops, respectively. Design bases and performance predictions for the major loop components, including the lithium heater and the potassium boiler, condenser and preheater, are outlined.

  13. 14 CFR 121.1500 - SFAR No. 111-Lavatory Oxygen Systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false SFAR No. 111-Lavatory Oxygen Systems. 121... § 121.1500 SFAR No. 111—Lavatory Oxygen Systems. (a) Applicability. This SFAR applies to the following persons: (1) All operators of transport category airplanes that are equipped with any chemical oxygen...

  14. 14 CFR 121.1500 - SFAR No. 111-Lavatory Oxygen Systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false SFAR No. 111-Lavatory Oxygen Systems. 121... § 121.1500 SFAR No. 111—Lavatory Oxygen Systems. (a) Applicability. This SFAR applies to the following persons: (1) All operators of transport category airplanes that are equipped with any chemical oxygen...

  15. A potassium Rankine multimegawatt nuclear electric propulsion concept

    NASA Technical Reports Server (NTRS)

    Baumeister, E.; Rovang, R.; Mills, J.; Sercel, J.; Frisbee, R.

    1990-01-01

    Multimegawatt nuclear electric propulsion (NEP) has been identified as a potentially attractive option for future space exploratory missions. A liquid-metal-cooled reactor, potassium Rankine power system that is being developed is suited to fulfill this application. The key features of the nuclear power system are described, and system characteristics are provided for various potential NEP power ranges and operational lifetimes. The results of recent mission studies are presented to illustrate some of the potential benefits to future space exploration to be gained from high-power NEP. Specifically, mission analyses have been performed to assess the mass and trip time performance of advanced NEP for both cargo and piloted missions to Mars.

  16. Preliminary thermodynamic study for an efficient turbo-blower external combustion Rankine cycle

    NASA Astrophysics Data System (ADS)

    Romero Gómez, Manuel; Romero Gómez, Javier; Ferreiro Garcia, Ramón; Baaliña Insua, Álvaro

    2014-08-01

    This research paper presents a preliminary thermodynamic study of an innovative power plant operating under a Rankine cycle fed by an external combustion system with turbo-blower (TB). The power plant comprises an external combustion system for natural gas, where the combustion gases yield their thermal energy, through a heat exchanger, to a carbon dioxide Rankine cycle operating under supercritical conditions and with quasi-critical condensation. The TB exploits the energy from the pressurised exhaust gases for compressing the combustion air. The study is focused on the comparison of the combustion system's conventional technology with that of the proposed. An energy analysis is carried out and the effect of the flue gas pressure on the efficiency and on the heat transfer in the heat exchanger is studied. The coupling of the TB results in an increase in efficiency and of the convection coefficient of the flue gas with pressure, favouring a reduced volume of the heat exchanger. The proposed innovative system achieves increases in efficiency of around 12 % as well as a decrease in the heat exchanger volume of 3/5 compared with the conventional technology without TB.

  17. 46 CFR 111.30-24 - Generation systems greater than 3000 kw.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...

  18. 46 CFR 111.30-24 - Generation systems greater than 3000 kw.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...

  19. 46 CFR 111.30-24 - Generation systems greater than 3000 kw.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...

  20. 46 CFR 111.30-24 - Generation systems greater than 3000 kw.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...

  1. 46 CFR 111.30-24 - Generation systems greater than 3000 kw.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...

  2. Effect of nitrogen on tensile properties and structures of T-111 (tantalum, 8 percent tungsten, 2 percent hafnium) tubing

    NASA Technical Reports Server (NTRS)

    Buzzard, R. J.; Metroka, R. R.

    1973-01-01

    The effect of controlled nitrogen additions was evaluated on the mechanical properties of T-111 (Ta-8W-2Hf) fuel pin cladding material proposed for use in a lithium-cooled nuclear reactor concept. Additions of 80 to 1125 ppm nitrogen resulted in increased strengthening of T-111 tubular section test specimens at temperatures of 25 to 1200 C. Homogeneous distributions of up to 500 ppm nitrogen did not seriously decrease tensile ductility. Both single and two-phase microstructures, with hafnium nitride as the second phase, were evaluated in this study.

  3. Alkali Metal Rankine Cycle Boiler Technology Challenges and Some Potential Solutions for Space Nuclear Power and Propulsion Applications

    NASA Technical Reports Server (NTRS)

    Stone, James R.

    1994-01-01

    Alkali metal boilers are of interest for application to future space Rankine cycle power conversion systems. Significant progress on such boilers was accomplished in the 1960's and early 1970's, but development was not continued to operational systems since NASA's plans for future space missions were drastically curtailed in the early 1970's. In particular, piloted Mars missions were indefinitely deferred. With the announcement of the Space Exploration Initiative (SEI) in July 1989 by President Bush, interest was rekindled in challenging space missions and, consequently in space nuclear power and propulsion. Nuclear electric propulsion (NEP) and nuclear thermal propulsion (NTP) were proposed for interplanetary space vehicles, particularly for Mars missions. The potassium Rankine power conversion cycle became of interest to provide electric power for NEP vehicles and for 'dual-mode' NTP vehicles, where the same reactor could be used directly for propulsion and (with an additional coolant loop) for power. Although the boiler is not a major contributor to system mass, it is of critical importance because of its interaction with the rest of the power conversion system; it can cause problems for other components such as excess liquid droplets entering the turbine, thereby reducing its life, or more critically, it can drive instabilities-some severe enough to cause system failure. Funding for the SEI and its associated technology program from 1990 to 1993 was not sufficient to support significant new work on Rankine cycle boilers for space applications. In Fiscal Year 1994, funding for these challenging missions and technologies has again been curtailed, and planning for the future is very uncertain. The purpose of this paper is to review the technologies developed in the 1960's and 1970's in the light of the recent SEI applications. In this way, future Rankine cycle boiler programs may be conducted most efficiently. This report is aimed at evaluating alkali metal boiler

  4. Organic rankine cycle fluid

    DOEpatents

    Brasz, Joost J.; Jonsson, Ulf J.

    2006-09-05

    A method of operating an organic rankine cycle system wherein a liquid refrigerant is circulated to an evaporator where heat is introduced to the refrigerant to convert it to vapor. The vapor is then passed through a turbine, with the resulting cooled vapor then passing through a condenser for condensing the vapor to a liquid. The refrigerant is one of CF.sub.3CF.sub.2C(O)CF(CF.sub.3).sub.2, (CF.sub.3).sub.2 CFC(O)CF(CF.sub.3).sub.2, CF.sub.3(CF.sub.2).sub.2C(O)CF(CF.sub.3).sub.2, CF.sub.3(CF.sub.2).sub.3C(O)CF(CG.sub.3).sub.2, CF.sub.3(CF.sub.2).sub.5C(O)CF.sub.3, CF.sub.3CF.sub.2C(O)CF.sub.2CF.sub.2CF.sub.3, CF.sub.3C(O)CF(CF.sub.3).sub.2.

  5. Tensile properties from room temperature to 1315 C of tungsten-lined tantalum-alloy (T-111) tubing fabricated by hot isostatic pressing

    NASA Technical Reports Server (NTRS)

    Buzzard, R. J.; Metroka, R. R.

    1974-01-01

    The effects were studied of a thin tungsten liner on the tensile properties of T-111 tubing considered for fuel cladding in a space power nuclear reactor concept. The results indicate that the metallurgically bonded liner had no appreciable effects on the properties of the T-111 tubing. A hot isostatic pressing method used to apply the liners is described along with a means for overcoming the possible embrittling effects of hydrogen contamination.

  6. Parametric and working fluid analysis of a combined organic Rankine-vapor compression refrigeration system activated by low-grade thermal energy.

    PubMed

    Saleh, B

    2016-09-01

    The potential use of many common hydrofluorocarbons and hydrocarbons as well as new hydrofluoroolefins, i.e. R1234yf and R1234ze(E) working fluids for a combined organic Rankine cycle and vapor compression refrigeration (ORC-VCR) system activated by low-grade thermal energy is evaluated. The basic ORC operates between 80 and 40 °C typical for low-grade thermal energy power plants while the basic VCR cycle operates between 5 and 40 °C. The system performance is characterized by the overall system coefficient of performance (COPS) and the total mass flow rate of the working fluid for each kW cooling capacity ([Formula: see text]). The effects of different working parameters such as the evaporator, condenser, and boiler temperatures on the system performance are examined. The results illustrate that the maximum COPS values are attained using the highest boiling candidates with overhanging T-s diagram, i.e. R245fa and R600, while R600 has the lowest [Formula: see text] under the considered operating conditions. Among the proposed candidates, R600 is the best candidate for the ORC-VCR system from the perspectives of environmental issues and system performance. Nevertheless, its flammability should attract enough attention. The maximum COPS using R600 is found to reach up to 0.718 at a condenser temperature of 30 °C and the basic values for the remaining parameters.

  7. Evaluation of T-111 forced-convection loop tested with lithium at 1370 C. [free convection

    NASA Technical Reports Server (NTRS)

    Devan, J. H.; Long, E. L., Jr.

    1975-01-01

    A T-111 alloy (Ta-8% W-2% Hf) forced-convection loop containing molten lithium was operated 3000 hr at a maximum temperature of 1370 C. Flow velocities up to 6.3 m/sec were used, and the results of this forced-convection loop are very similar to those observed in lower velocity thermal-convection loops of T-111 containing lithium. Weight changes were determined at 93 positions around the loop. The maximum dissolution rate occurred at the maximum wall temperature of the loop and was less than 1.3 microns/year. Mass transfer of hafnium, nitrogen, and, to a lesser extent, carbon occurred from the hotter to cooler regions. Exposed surfaces in the highest temperature region were found to be depleted in hafnium to a depth of 60 microns with no detectable change in tungsten content. There was some loss in room-temperature tensile strength for specimens exposed to lithium at 1370 C, attributable to depletion of hafnium and nitrogen and to attendant grain growth.

  8. Affordable Rankine Cycle Waste Heat Recovery for Heavy Duty Trucks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Subramanian, Swami Nathan

    Nearly 30% of fuel energy is not utilized and wasted in the engine exhaust. Organic Rankine Cycle (ORC) based waste heat recovery (WHR) systems offer a promising approach on waste energy recovery and improving the efficiency of Heavy-Duty diesel engines. Major barriers in the ORC WHR system are the system cost and controversial waste heat recovery working fluids. More than 40% of the system cost is from the additional heat exchangers (recuperator, condenser and tail pipe boiler). The secondary working fluid loop designed in ORC system is either flammable or environmentally sensitive. The Eaton team investigated a novel approach tomore » reduce the cost of implementing ORC based WHR systems to Heavy-Duty (HD) Diesel engines while utilizing safest working fluids. Affordable Rankine Cycle (ARC) concept aimed to define the next generation of waste energy recuperation with a cost optimized WHR system. ARC project used engine coolant as the working fluid. This approach reduced the need for a secondary working fluid circuit and subsequent complexity. A portion of the liquid phase engine coolant has been pressurized through a set of working fluid pumps and used to recover waste heat from the exhaust gas recirculation (EGR) and exhaust tail pipe exhaust energy. While absorbing heat, the mixture is partially vaporized but remains a wet binary mixture. The pressurized mixed-phase engine coolant mixture is then expanded through a fixed-volume ratio expander that is compatible with two-phase conditions. Heat rejection is accomplished through the engine radiator, avoiding the need for a separate condenser. The ARC system has been investigated for PACCAR’s MX-13 HD diesel engine.« less

  9. Optimum working fluids for solar powered Rankine cycle cooling of buildings

    NASA Astrophysics Data System (ADS)

    Wali, E.

    1980-01-01

    A number of fluids were screened for their operational reliability and thermal stability as working fluids for domestic solar Rankine cycle cooling. The results indicate that the halogenated compound R-113, followed by the fluorinated compound FC-88, is best suited for safe Rankine cycle operation. Further dynamic investigations are, however, needed to study the thermal stability of these fluids in the presence and absence of lubricants in copper, steel, and alloy conduits

  10. Multimegawatt potassium Rankine power for nuclear electric power

    NASA Technical Reports Server (NTRS)

    Rovang, Richard D.; Mills, Joseph C.; Baumeister, Ernie B.

    1991-01-01

    A cermet fueled potassium rankine power system concept has been developed for various power ranges and operating lifetimes. This concept utilizes a single primary lithium loop to transport thermal energy from the reactor to the boiler. Multiple, independent potassium loops are employed to achieve the required reliability of 99 percent. The potassium loops are two phase systems which expand heated potassium vapor through multistage turboalternators to produce a 10-kV dc electrical output. Condensation occurs by-way-of a shear-flow condenser, producing a 100 percent liquid potassium stream which is pumped back to the boiler. Waste heat is rejected by an advanced carbon-carbon radiator at approximately 1000 K. Overall system efficiencies of 19.3 percent to 20.5 percent were calculated depending on mission life and power level.

  11. 46 CFR 111.52-5 - Systems 1500 kilowatts or above.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Systems 1500 kilowatts or above. 111.52-5 Section 111.52-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC... procedure for utility or industrial applications. [CGD 94-108, 61 FR 28279, June 4, 1996, as amended by USCG...

  12. 46 CFR 111.52-5 - Systems 1500 kilowatts or above.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Systems 1500 kilowatts or above. 111.52-5 Section 111.52-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC... procedure for utility or industrial applications. [CGD 94-108, 61 FR 28279, June 4, 1996, as amended by USCG...

  13. 46 CFR 111.52-5 - Systems 1500 kilowatts or above.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Systems 1500 kilowatts or above. 111.52-5 Section 111.52-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC... procedure for utility or industrial applications. [CGD 94-108, 61 FR 28279, June 4, 1996, as amended by USCG...

  14. 46 CFR 111.52-5 - Systems 1500 kilowatts or above.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Systems 1500 kilowatts or above. 111.52-5 Section 111.52-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC... procedure for utility or industrial applications. [CGD 94-108, 61 FR 28279, June 4, 1996, as amended by USCG...

  15. 46 CFR 111.52-5 - Systems 1500 kilowatts or above.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Systems 1500 kilowatts or above. 111.52-5 Section 111.52-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC... procedure for utility or industrial applications. [CGD 94-108, 61 FR 28279, June 4, 1996, as amended by USCG...

  16. Rankine-Brayton engine powered solar thermal aircraft

    DOEpatents

    Bennett, Charles L [Livermore, CA

    2009-12-29

    A solar thermal powered aircraft powered by heat energy from the sun. A Rankine-Brayton hybrid cycle heat engine is carried by the aircraft body for producing power for a propulsion mechanism, such as a propeller or other mechanism for enabling sustained free flight. The Rankine-Brayton engine has a thermal battery, preferably containing a lithium-hydride and lithium mixture, operably connected to it so that heat is supplied from the thermal battery to a working fluid. A solar concentrator, such as reflective parabolic trough, is movably connected to an optically transparent section of the aircraft body for receiving and concentrating solar energy from within the aircraft. Concentrated solar energy is collected by a heat collection and transport conduit, and heat transported to the thermal battery. A solar tracker includes a heliostat for determining optimal alignment with the sun, and a drive motor actuating the solar concentrator into optimal alignment with the sun based on a determination by the heliostat.

  17. Solar-powered Rankine heat pump for heating and cooling

    NASA Technical Reports Server (NTRS)

    Rousseau, J.

    1978-01-01

    The design, operation and performance of a familyy of solar heating and cooling systems are discussed. The systems feature a reversible heat pump operating with R-11 as the working fluid and using a motor-driven centrifugal compressor. In the cooling mode, solar energy provides the heat source for a Rankine power loop. The system is operational with heat source temperatures ranging from 155 to 220 F; the estimated coefficient of performance is 0.7. In the heating mode, the vapor-cycle heat pump processes solar energy collected at low temperatures (40 to 80 F). The speed of the compressor can be adjusted so that the heat pump capacity matches the load, allowing a seasonal coefficient of performance of about 8 to be attained.

  18. 46 CFR 111.103-1 - Power ventilation systems except machinery space ventilation systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Remote Stopping Systems § 111.103-1 Power ventilation systems except machinery space ventilation systems. Each power ventilation system must... 46 Shipping 4 2010-10-01 2010-10-01 false Power ventilation systems except machinery space...

  19. 46 CFR 111.103-1 - Power ventilation systems except machinery space ventilation systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Remote Stopping Systems § 111.103-1 Power ventilation systems except machinery space ventilation systems. Each power ventilation system must... 46 Shipping 4 2011-10-01 2011-10-01 false Power ventilation systems except machinery space...

  20. 46 CFR 111.103-1 - Power ventilation systems except machinery space ventilation systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Remote Stopping Systems § 111.103-1 Power ventilation systems except machinery space ventilation systems. Each power ventilation system must... 46 Shipping 4 2014-10-01 2014-10-01 false Power ventilation systems except machinery space...

  1. 46 CFR 111.103-1 - Power ventilation systems except machinery space ventilation systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Remote Stopping Systems § 111.103-1 Power ventilation systems except machinery space ventilation systems. Each power ventilation system must... 46 Shipping 4 2012-10-01 2012-10-01 false Power ventilation systems except machinery space...

  2. 46 CFR 111.103-1 - Power ventilation systems except machinery space ventilation systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Remote Stopping Systems § 111.103-1 Power ventilation systems except machinery space ventilation systems. Each power ventilation system must... 46 Shipping 4 2013-10-01 2013-10-01 false Power ventilation systems except machinery space...

  3. Estimating the neutrally buoyant energy density of a Rankine-cycle/fuel-cell underwater propulsion system

    NASA Astrophysics Data System (ADS)

    Waters, Daniel F.; Cadou, Christopher P.

    2014-02-01

    A unique requirement of underwater vehicles' power/energy systems is that they remain neutrally buoyant over the course of a mission. Previous work published in the Journal of Power Sources reported gross as opposed to neutrally-buoyant energy densities of an integrated solid oxide fuel cell/Rankine-cycle based power system based on the exothermic reaction of aluminum with seawater. This paper corrects this shortcoming by presenting a model for estimating system mass and using it to update the key findings of the original paper in the context of the neutral buoyancy requirement. It also presents an expanded sensitivity analysis to illustrate the influence of various design and modeling assumptions. While energy density is very sensitive to turbine efficiency (sensitivity coefficient in excess of 0.60), it is relatively insensitive to all other major design parameters (sensitivity coefficients < 0.15) like compressor efficiency, inlet water temperature, scaling methodology, etc. The neutral buoyancy requirement introduces a significant (∼15%) energy density penalty but overall the system still appears to offer factors of five to eight improvements in energy density (i.e., vehicle range/endurance) over present battery-based technologies.

  4. 21 CFR 111.55 - What are the requirements to implement a production and process control system?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... production and process control system? 111.55 Section 111.55 Food and Drugs FOOD AND DRUG ADMINISTRATION... to Establish a Production and Process Control System § 111.55 What are the requirements to implement a production and process control system? You must implement a system of production and process...

  5. 46 CFR 111.52-3 - Systems below 1500 kilowatts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-3 Systems below 1500 kilowatts. The... maximum short-circuit current of a direct current system must be assumed to be 10 times the aggregate...

  6. 46 CFR 111.52-3 - Systems below 1500 kilowatts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-3 Systems below 1500 kilowatts. The... maximum short-circuit current of a direct current system must be assumed to be 10 times the aggregate...

  7. 46 CFR 111.52-3 - Systems below 1500 kilowatts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-3 Systems below 1500 kilowatts. The following short-circuit assumptions must be made for a system with an aggregate generating capacity below... maximum short-circuit current of a direct current system must be assumed to be 10 times the aggregate...

  8. 23 CFR 500.111 - IMS.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false IMS. 500.111 Section 500.111 Highways FEDERAL HIGHWAY... SYSTEMS Management Systems § 500.111 IMS. An effective IMS for intermodal facilities and systems provides... the various land-based transportation facilities and systems. An IMS should include, at a minimum: (a...

  9. Utilization of recently developed codes for high power Brayton and Rankine cycle power systems

    NASA Technical Reports Server (NTRS)

    Doherty, Michael P.

    1993-01-01

    Two recently developed FORTRAN computer codes for high power Brayton and Rankine thermodynamic cycle analysis for space power applications are presented. The codes were written in support of an effort to develop a series of subsystem models for multimegawatt Nuclear Electric Propulsion, but their use is not limited just to nuclear heat sources or to electric propulsion. Code development background, a description of the codes, some sample input/output from one of the codes, and state future plans/implications for the use of these codes by NASA's Lewis Research Center are provided.

  10. 46 CFR 111.05-29 - Dual voltage direct current systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Dual voltage direct current systems. Each dual voltage direct current system must have a suitably sensitive ground detection system which indicates current in the ground connection, has a range of at least... 46 Shipping 4 2010-10-01 2010-10-01 false Dual voltage direct current systems. 111.05-29 Section...

  11. 46 CFR 111.05-29 - Dual voltage direct current systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Dual voltage direct current systems. Each dual voltage direct current system must have a suitably sensitive ground detection system which indicates current in the ground connection, has a range of at least... 46 Shipping 4 2011-10-01 2011-10-01 false Dual voltage direct current systems. 111.05-29 Section...

  12. Technical and economic evaluation of a Brayton-Rankine combined cycle solar-thermal power plant

    NASA Astrophysics Data System (ADS)

    Wright, J. D.; Copeland, R. J.

    1981-05-01

    An assessment of gas-liquid direct-contact heat exchange and of a new storage-coupled system was conducted. Both technical and economic issues are evaluated. Specifically, the storage-coupled combined cycle is compared with a molten salt system. The open Brayton cycle system is used as a topping cycle, and the reject heat powers the molten salt/Rankine system. In this study the molten salt system is left unmodified, the Brayton cycle is integrated on top of a Marietta description of an existing molten salt plant. This compares a nonoptimized combined cycle with an optimized molten salt system.

  13. Steam Rankine Solar Receiver, phase 2

    NASA Technical Reports Server (NTRS)

    Deanda, L. E.; Faust, M.

    1981-01-01

    A steam rankine solar receiver (SRSR) based on a tubular concept was designed and developed. The SRSR is an insulated, cylindrical coiled tube boiler which is mounted at the focal plane of a fully tracking parabolic solar reflector. The concentrated solar energy received at the focal plane is then transformed to thermal energy through steam generation. The steam is used in a small Rankine cycle heat engine to drive a generator for the production of electrical energy. The SRSR was designed to have a dual mode capability, performing as a once through boiler with and without reheat. This was achieved by means of two coils which constitute the boiler. The boiler core size of the SRSR is 17.0 inches in diameter and 21.5 inches long. The tube size is 7/16 inch I.D. by 0.070 inch wall for the primary, and 3/4 inch I.D. by 0.125 inch wall for the reheat section. The materials used were corrosion resistant steel (CRES) type 321 and type 347 stainless steel. The core is insulated with 6 inches of cerablanket insulation wrapped around the outer wall. The aperture end and the reflector back plate at the closed end section are made of silicon carbide. The SRSR accepts 85 kwth and has a design life of 10,000 hrs when producing steam at 1400 F and 2550 psig.

  14. 21 CFR 111.60 - What are the design requirements for the production and process control system?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... to Establish a Production and Process Control System § 111.60 What are the design requirements for... 21 Food and Drugs 2 2012-04-01 2012-04-01 false What are the design requirements for the production and process control system? 111.60 Section 111.60 Food and Drugs FOOD AND DRUG ADMINISTRATION...

  15. 21 CFR 111.60 - What are the design requirements for the production and process control system?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... to Establish a Production and Process Control System § 111.60 What are the design requirements for... 21 Food and Drugs 2 2013-04-01 2013-04-01 false What are the design requirements for the production and process control system? 111.60 Section 111.60 Food and Drugs FOOD AND DRUG ADMINISTRATION...

  16. 21 CFR 111.60 - What are the design requirements for the production and process control system?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... to Establish a Production and Process Control System § 111.60 What are the design requirements for... 21 Food and Drugs 2 2011-04-01 2011-04-01 false What are the design requirements for the production and process control system? 111.60 Section 111.60 Food and Drugs FOOD AND DRUG ADMINISTRATION...

  17. 21 CFR 111.60 - What are the design requirements for the production and process control system?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... to Establish a Production and Process Control System § 111.60 What are the design requirements for... 21 Food and Drugs 2 2014-04-01 2014-04-01 false What are the design requirements for the production and process control system? 111.60 Section 111.60 Food and Drugs FOOD AND DRUG ADMINISTRATION...

  18. 21 CFR 111.60 - What are the design requirements for the production and process control system?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... to Establish a Production and Process Control System § 111.60 What are the design requirements for... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What are the design requirements for the production and process control system? 111.60 Section 111.60 Food and Drugs FOOD AND DRUG ADMINISTRATION...

  19. Integrated biomass pyrolysis with organic Rankine cycle for power generation

    NASA Astrophysics Data System (ADS)

    Nur, T. B.; Syahputra, A. W.

    2018-02-01

    The growing interest on Organic Rankine Cycle (ORC) application to produce electricity by utilizing biomass energy sources are increasingly due to its successfully used to generate power from waste heat available in industrial processes. Biomass pyrolysis is one of the thermochemical technologies for converting biomass into energy and chemical products consisting of liquid bio-oil, solid biochar, and pyrolytic gas. In the application, biomass pyrolysis can be divided into three main categories; slow, fast and flash pyrolysis mainly aiming at maximizing the products of bio-oil or biochar. The temperature of synthesis gas generated during processes can be used for Organic Rankine Cycle to generate power. The heat from synthesis gas during pyrolysis processes was transfer by thermal oil heater to evaporate ORC working fluid in the evaporator unit. In this study, the potential of the palm oil empty fruit bunch, palm oil shell, and tree bark have been used as fuel from biomass to generate electricity by integrated with ORC. The Syltherm-XLT thermal oil was used as the heat carrier from combustion burner, while R245fa was used as the working fluid for ORC system. Through Aspen Plus, this study analyses the influences on performance of main thermodynamic parameters, showing the possibilities of reaching an optimum performance for different working conditions that are characteristics of different design parameters.

  20. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  1. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  2. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  3. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  4. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  5. Optimal design of solid oxide fuel cell, ammonia-water single effect absorption cycle and Rankine steam cycle hybrid system

    NASA Astrophysics Data System (ADS)

    Mehrpooya, Mehdi; Dehghani, Hossein; Ali Moosavian, S. M.

    2016-02-01

    A combined system containing solid oxide fuel cell-gas turbine power plant, Rankine steam cycle and ammonia-water absorption refrigeration system is introduced and analyzed. In this process, power, heat and cooling are produced. Energy and exergy analyses along with the economic factors are used to distinguish optimum operating point of the system. The developed electrochemical model of the fuel cell is validated with experimental results. Thermodynamic package and main parameters of the absorption refrigeration system are validated. The power output of the system is 500 kW. An optimization problem is defined in order to finding the optimal operating point. Decision variables are current density, temperature of the exhaust gases from the boiler, steam turbine pressure (high and medium), generator temperature and consumed cooling water. Results indicate that electrical efficiency of the combined system is 62.4% (LHV). Produced refrigeration (at -10 °C) and heat recovery are 101 kW and 22.1 kW respectively. Investment cost for the combined system (without absorption cycle) is about 2917 kW-1.

  6. A 15kWe (nominal) solar thermal electric power conversion concept definition study: Steam Rankine reheat reciprocator system

    NASA Technical Reports Server (NTRS)

    Fuller, H.; Demler, R.; Poulin, E.; Dantowitz, P.

    1979-01-01

    An evaluation was made of the potential of a steam Rankine reheat reciprocator engine to operate at high efficiency in a point-focusing distributed receiver solar thermal-electric power system. The scope of the study included the engine system and electric generator; not included was the solar collector/mirror or the steam generator/receiver. A parametric analysis of steam conditions was completed leading to the selection of 973 K 12.1 MPa as the steam temperature/pressure for a conceptual design. A conceptual design was completed for a two cylinder/ opposed engine operating at 1800 rpm directly coupled to a commercially available induction generator. A unique part of the expander design is the use of carbon/graphite piston rings to eliminate the need for using oil as an upper cylinder lubricant. The evaluation included a system weight estimate of 230 kg at the mirror focal point with the condenser mounted separately on the ground. The estimated cost of the overall system is $1932 or $90/kW for the maximum 26 kW output.

  7. Fabrication and test of a space power boiler feed electromagnetic pump. Part 1: Design and manufacture of pump

    NASA Technical Reports Server (NTRS)

    Gahan, J. W.; Powell, A. H.; Pileggi, P. T.; Thompson, S. P.

    1972-01-01

    A three-phase helical induction electromagnetic (EM) pump has been designed and built. This pump was designed for use as the boiler-feed pump of a potassium Rankine-cycle space electric power system. The pump is constructed of high temperature materials including a T-111 duct, Hiperco 27 magnetic material, nickel clad silver conductor wire, and a completely inorganic insulation system. The pump is designed to deliver 3.25 lb/sec potassium at 1000 F with a developed head of 240 psi while being cooled by 800 F NaK. At these conditions, the overall pump efficiency is expected to be 18%.

  8. 46 CFR 111.05-27 - Grounded neutral alternating current systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the ground connection, is able to withstand the maximum available fault current without damage, and... 46 Shipping 4 2011-10-01 2011-10-01 false Grounded neutral alternating current systems. 111.05-27... Grounded neutral alternating current systems. Grounded neutral and high-impedance grounded neutral...

  9. 46 CFR 111.05-27 - Grounded neutral alternating current systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the ground connection, is able to withstand the maximum available fault current without damage, and... 46 Shipping 4 2010-10-01 2010-10-01 false Grounded neutral alternating current systems. 111.05-27... Grounded neutral alternating current systems. Grounded neutral and high-impedance grounded neutral...

  10. Organic rankine cycle waste heat applications

    DOEpatents

    Brasz, Joost J.; Biederman, Bruce P.

    2007-02-13

    A machine designed as a centrifugal compressor is applied as an organic rankine cycle turbine by operating the machine in reverse. In order to accommodate the higher pressures when operating as a turbine, a suitable refrigerant is chosen such that the pressures and temperatures are maintained within established limits. Such an adaptation of existing, relatively inexpensive equipment to an application that may be otherwise uneconomical, allows for the convenient and economical use of energy that would be otherwise lost by waste heat to the atmosphere.

  11. Method of optimizing performance of Rankine cycle power plants

    DOEpatents

    Pope, William L.; Pines, Howard S.; Doyle, Padraic A.; Silvester, Lenard F.

    1982-01-01

    A method for efficiently operating a Rankine cycle power plant (10) to maximize fuel utilization efficiency or energy conversion efficiency or minimize costs by selecting a turbine (22) fluid inlet state which is substantially in the area adjacent and including the transposed critical temperature line (46).

  12. Analysis of simian virus 40 small t antigen-induced progression of rat F111 cells minimally transformed by large T antigen.

    PubMed Central

    Zerrahn, J; Deppert, W

    1993-01-01

    Minimal transformants of rat F111 fibroblasts were established after infection with the large T antigen (large T)-encoding retroviral expression vector pZIPTEX (M. Brown, M. McCormack, K. Zinn, M. Farrell, I. Bikel, and D. Livingston, J. Virol. 60:290-293, 1986). Coexpression of small t antigen (small t) in these cells efficiently led to their progression toward a significantly enhanced transformed phenotype. Small t forms a complex with phosphatase 2A and thereby might influence cellular phosphorylation processes, including the phosphorylation of large T. Since phosphorylation can modulate the transforming activity of large T, we asked whether the phosphorylation status of large T in minimally transformed cells might differ from that of large T in maximally transformed FR(wt648) cells and whether it might be altered by coexpression of small t. We found the phosphate turnover on large T in minimally transformed cells significantly different from that in fully transformed cells. This resulted in underphosphorylation of large T in minimally transformed cells at phosphorylation sites previously shown to be involved in the regulation of the transforming activity of large T. However, coexpression of small t in the minimally transformed cells did not alter the phosphate turnover on large T during progression; i.e., it did not induce a change in the steady-state phosphorylation of large T. This suggests that the helper function of small t during the progression of these cells was not mediated by modulating phosphatase 2A activity toward large T. Images PMID:8382310

  13. Comparative thermodynamic performance of some Rankine/Brayton cycle configurations for a low-temperature energy application

    NASA Technical Reports Server (NTRS)

    Lansing, F. L.

    1977-01-01

    Various configurations combining solar-Rankine and fuel-Brayton cycles were analyzed in order to find the arrangement which has the highest thermal efficiency and the smallest fuel share. A numerical example is given to evaluate both the thermodynamic performance and the economic feasibility of each configuration. The solar-assisted regenerative Rankine cycle was found to be leading the candidates from both points of energy utilization and fuel conservation.

  14. Study of advanced radial outflow turbine for solar steam Rankine engines

    NASA Technical Reports Server (NTRS)

    Martin, C.; Kolenc, T.

    1979-01-01

    The performance characteristics of various steam Rankine engine configurations for solar electric power generation were investigated. A radial outflow steam turbine was investigated to determine: (1) a method for predicting performance from experimental data; (2) the flexibility of a single design with regard to power output and pressure ratio; and (3) the effect of varying the number of turbine stages. All turbine designs were restricted to be compatible with commercially available gearboxes and generators. A study of several operating methods and control schemes for the steam Rankine engine shows that from an efficiency and control simplicity standpoint, the best approach is to hold turbine inlet temperature constant, vary turbine inlet pressure to match load, and allow condenser temperature to float maintaining constant heat rejection load.

  15. 48 CFR 732.111 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111 Section 732.111 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may...

  16. 48 CFR 732.111 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clauses. 732.111 Section 732.111 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may...

  17. 46 CFR 111.33-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.33-1 Section 111.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-1 General. This subpart is applicable to all power...

  18. 46 CFR 111.33-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.33-1 Section 111.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-1 General. This subpart is applicable to all power...

  19. 46 CFR 111.33-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.33-1 Section 111.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-1 General. This subpart is applicable to all power...

  20. 46 CFR 111.33-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.33-1 Section 111.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-1 General. This subpart is applicable to all power...

  1. 46 CFR 111.99-1 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...

  2. 46 CFR 111.99-1 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...

  3. 46 CFR 111.99-1 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...

  4. 46 CFR 111.99-1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...

  5. 46 CFR 111.99-1 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...

  6. 46 CFR 111.99-3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Definitions. 111.99-3 Section 111.99-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-3 Definitions. As used in this subpart— Central...

  7. Rankine cycle condenser pressure control using an energy conversion device bypass valve

    DOEpatents

    Ernst, Timothy C; Nelson, Christopher R; Zigan, James A

    2014-04-01

    The disclosure provides a waste heat recovery system and method in which pressure in a Rankine cycle (RC) system of the WHR system is regulated by diverting working fluid from entering an inlet of an energy conversion device of the RC system. In the system, an inlet of a controllable bypass valve is fluidly coupled to a working fluid path upstream of an energy conversion device of the RC system, and an outlet of the bypass valve is fluidly coupled to the working fluid path upstream of the condenser of the RC system such that working fluid passing through the bypass valve bypasses the energy conversion device and increases the pressure in a condenser. A controller determines the temperature and pressure of the working fluid and controls the bypass valve to regulate pressure in the condenser.

  8. The reductive degradation of 1,1,1-trichloroethane by Fe(0) in a soil slurry system.

    PubMed

    Wu, Xiaoliang; Lu, Shuguang; Qiu, Zhaofu; Sui, Qian; Lin, Kuangfei; Du, Xiaoming; Luo, Qishi

    2014-01-01

    Most studies on the treatment of chlorinated contaminants by Fe(0) focus on aqueous system tests. However, few is known about the effectiveness of these tests for degrading chlorinated contaminants such as 1,1,1-trichloroethane (TCA) in soil. In this work, the reductive degradation performance of 1,1,1-TCA by Fe(0) was thoroughly investigated in a soil slurry system. The effects of various factors including acid-washed iron, the initial 1,1,1-TCA concentration, Fe(0) dosage, slurry pH, and common constituents in groundwater and soil such as Cl(-), HCO3 (-), SO4 (2-), and NO3 (-) anions and humic acid (HA) were evaluated. The experimental results showed that 1,1,1-TCA could be effectively degraded in 12 h for an initial Fe(0) dosage of 10 g L(-1) and a soil/water mass ratio of 1:5. The soil slurry experiments showed two-stage degradation kinetics: a slow reaction in the first stage and a fast reductive degradation of 1,1,1-TCA in the second stage. The reductive degradation of 1,1,1-TCA was expedited as the mass concentration of Fe(0) increased. In addition, high pHs adversely affected the degradation of 1,1,1-TCA over a pH range of 5.4-8.0 and the reductive degradation efficiency decreased with increasing slurry pH. The initial 1,1,1-TCA concentration and the presence of Cl(-) and SO4(2-) anions had negligible effects. HCO3(-) anions had a accelerative effect on 1,1,1-TCA removal, and both NO3(-) and HA had inhibitory effects. A Cl(-) mass balance showed that the amount of Cl(-) ions released into the soil slurry system during the 1,1,1-TCA degradation increased with increasing reaction time, suggesting that the main degradation mechanism of 1,1,1-TCA by Fe(0) in a soil slurry system was reductive dechlorination with 1,1-DCA as the main intermediate. In conclusion, this study provides a theoretical basis for the practical application of the remediation of contaminated sites containing chlorinated solvent.

  9. Analysis of the Properties of Working Substances for the Organic Rankine Cycle based Database "REFPROP"

    NASA Astrophysics Data System (ADS)

    Galashov, Nikolay; Tsibulskiy, Svyatoslav; Serova, Tatiana

    2016-02-01

    The object of the study are substances that are used as a working fluid in systems operating on the basis of an organic Rankine cycle. The purpose of research is to find substances with the best thermodynamic, thermal and environmental properties. Research conducted on the basis of the analysis of thermodynamic and thermal properties of substances from the base "REFPROP" and with the help of numerical simulation of combined-cycle plant utilization triple cycle, where the lower cycle is an organic Rankine cycle. Base "REFPROP" describes and allows to calculate the thermodynamic and thermophysical parameters of most of the main substances used in production processes. On the basis of scientific publications on the use of working fluids in an organic Rankine cycle analysis were selected ozone-friendly low-boiling substances: ammonia, butane, pentane and Freon: R134a, R152a, R236fa and R245fa. For these substances have been identified and tabulated molecular weight, temperature of the triple point, boiling point, at atmospheric pressure, the parameters of the critical point, the value of the derivative of the temperature on the entropy of the saturated vapor line and the potential ozone depletion and global warming. It was also identified and tabulated thermodynamic and thermophysical parameters of the steam and liquid substances in a state of saturation at a temperature of 15 °C. This temperature is adopted as the minimum temperature of heat removal in the Rankine cycle when working on the water. Studies have shown that the best thermodynamic, thermal and environmental properties of the considered substances are pentane, butane and R245fa. For a more thorough analysis based on a gas turbine plant NK-36ST it has developed a mathematical model of combined cycle gas turbine (CCGT) triple cycle, where the lower cycle is an organic Rankine cycle, and is used as the air cooler condenser. Air condenser allows stating material at a temperature below 0 °C. Calculation of the

  10. ANL/RBC: A computer code for the analysis of Rankine bottoming cycles, including system cost evaluation and off-design performance

    NASA Technical Reports Server (NTRS)

    Mclennan, G. A.

    1986-01-01

    This report describes, and is a User's Manual for, a computer code (ANL/RBC) which calculates cycle performance for Rankine bottoming cycles extracting heat from a specified source gas stream. The code calculates cycle power and efficiency and the sizes for the heat exchangers, using tabular input of the properties of the cycle working fluid. An option is provided to calculate the costs of system components from user defined input cost functions. These cost functions may be defined in equation form or by numerical tabular data. A variety of functional forms have been included for these functions and they may be combined to create very general cost functions. An optional calculation mode can be used to determine the off-design performance of a system when operated away from the design-point, using the heat exchanger areas calculated for the design-point.

  11. Investigation of high temperature fracture of T-111 and ASTAR-811C

    NASA Technical Reports Server (NTRS)

    Gold, R. E.

    1971-01-01

    The high temperature deformation and fracture behavior of T-111 and ASTAR-811C were studied over the temperature range 982 to 2205 C (1800 to 4000 F). As-cast and wrought-recrystallized material as well as GTA welds in sheet and plate were evaluated using conventional tensile and creep tests. Post test examinations were performed using optical metallography, scanning electron microscopy and transmission electron microscopy. A high temperature region of reduced ductility, in terms of tensile elongation, was identified for both alloys. The reduction in tensile elongation became more severe with increase in grain size, being near catastrophic for the as-cast specimens. Optical and electron metallography indicated that even for failures at very low total strain, considerable deformation of a very localized nature had occurred prior to fracture.

  12. Working fluid selection for the Organic Rankine Cycle (ORC) exhaust heat recovery of an internal combustion engine power plant

    NASA Astrophysics Data System (ADS)

    Douvartzides, S.; Karmalis, I.

    2016-11-01

    Organic Rankine cycle technology is capable to efficiently convert low-grade heat into useful mechanical power. In the present investigation such a cycle is used for the recovery of heat from the exhaust gases of a four stroke V18 MAN 51/60DF internal combustion engine power plant operating with natural gas. Design is focused on the selection of the appropriate working fluid of the Rankine cycle in terms of thermodynamic, environmental and safety criteria. 37 candidate fluids have been considered and all Rankine cycles examined were subcritical. The thermodynamic analysis of all fluids has been comparatively undertaken and the effect of key operation conditions such as the evaporation pressure and the superheating temperature was taken into account. By appropriately selecting the working fluid and the Rankine cycle operation conditions the overall plant efficiency was improved by 5.52% and fuel consumption was reduced by 12.69%.

  13. Current Status of an Organic Rankine Cycle Engine Development Program

    NASA Technical Reports Server (NTRS)

    Barber, R. E.

    1984-01-01

    The steps taken to achieve improved bearing life in the organic Rankine cycle (ORC) engine being developed for use on solar parabolic dishes are presented. A summary of test results is given. Dynamic tests on the machine shaft and rotors of the ORC engine are also discussed.

  14. Rankine engine solar power generation. I - Performance and economic analysis

    NASA Technical Reports Server (NTRS)

    Gossler, A. A.; Orrock, J. E.

    1981-01-01

    Results of a computer simulation of the performance of a solar flat plate collector powered electrical generation system are presented. The simulation was configured to include locations in New Mexico, North Dakota, Tennessee, and Massachusetts, and considered a water-based heat-transfer fluid collector system with storage. The collectors also powered a Rankine-cycle boiler filled with a low temperature working fluid. The generator was considered to be run only when excess solar heat and full storage would otherwise require heat purging through the collectors. All power was directed into the utility grid. The solar powered generator unit addition was found to be dependent on site location and collector area, and reduced the effective solar cost with collector areas greater than 400-670 sq m. The sites were economically ranked, best to worst: New Mexico, North Dakota, Massachusetts, and Tennessee.

  15. 46 CFR 111.05-21 - Ground detection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Ground detection. 111.05-21 Section 111.05-21 Shipping... REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-21 Ground detection. There must be ground detection for each: (a) Electric propulsion system; (b) Ship's service power system; (c...

  16. 46 CFR 111.05-21 - Ground detection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Ground detection. 111.05-21 Section 111.05-21 Shipping... REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-21 Ground detection. There must be ground detection for each: (a) Electric propulsion system; (b) Ship's service power system; (c...

  17. F-111E IPCS in flight

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This NASA Dryden Flight Research Center photograph taken in 1975 shows the General Dynamic IPCS/F-111E Aardvark with a camouflage paint pattern. This prototype F-111E was used during the flight testing of the Integrated Propulsion Control System (IPCS). The wings of the IPCS/F-111E are swept back to near 60 degrees for supersonic flight. During the same period as F-111 TACT program, an F-111E Aardvark (#67-0115) was flown at the NASA Flight Research Center to investigate an electronic versus a conventional hydro-mechanical controlled engine. The program called integrated propulsion control system (IPCS) was a joint effort by NASA's Lewis Research Center and Flight Research Center, the Air Force's Flight Propulsion Laboratory and the Boeing, Honeywell and Pratt & Whitney companies. The left engine of the F-111E was selected for modification to an all electronic system. A Pratt & Whitney TF30-P-9 engine was modified and extensively laboratory, and ground-tested before installation into the F-111E. There were 14 IPCS flights made from 1975 through 1976. The flight demonstration program proved an engine could be controlled electronically, leading to a more efficient Digital Electronic Engine Control System flown in the F-15.

  18. The development of an air Brayton and a steam Rankine solar receiver

    NASA Technical Reports Server (NTRS)

    Greeven, M. V.

    1980-01-01

    An air Brayton and a steam Rankine solar receiver now under development are described. These cavity receivers accept concentrated insolation from a single point focus, parabolic concentrator, and use this energy to heat the working fluid. Both receivers were designed for a solar input of 85 kw. The air Brayton receiver heats the air to 816 C. A metallic plate-fin heat transfer surface is used in this unit to effect the energy transfer. The steam Rankine receiver was designed as a once-through boiler with reheat. The receiver heats the water to 704 C to produce steam at 17.22 MPa in the boiler section. The reheat section operates at 1.2 MPA, reheating the steam to 704 C.

  19. High-mobility hydrogen-terminated Si(111) transistors for measurement of six-fold valley degenerate two-dimensional electron systems in fractional quantum Hall regime

    NASA Astrophysics Data System (ADS)

    Hu, Binhui; Yazdanpanah, Mohamad Meqdad; Kane, Bruce E.

    2015-03-01

    The quality of hydrogen-terminated Si(111) (H-Si(111)) transistors has improved significantly. Peak electron mobility of 325,000 cm2/Vs was achieved at 90 mK, and the fractional quantum Hall effect (FQHE) at 1 < ν < 2 was studied extensively. We have further improved the device by solving gate leakage and contact problems with an updated design, in which a Si piece with thermal oxide acts as a gate through a vacuum cavity, and PN junctions are used to define a hexagonal two-dimensional (2D) region on a H-Si(111) piece. The device operates as an ambipolar transistor, in which a 2D electron system (2DES) and a 2D hole system can be induced at the same H-Si(111) surface. Peak electron mobility of more than 200,000 cm2/Vs is routinely achieved at 300 mK. The Si(111) surface has a six-fold valley degeneracy. The hexagonal device is designed to investigate the symmetry of the 2DES. Preliminary data show that the transport anisotropy at ν < 6 can be explained by the valley occupancy. The details of the valley occupancy can be caused by several mechanisms, such as miscut, magnetic field, pseudospin quantum Hall ferromagnetism (QHFM), and nematic valley polarization phases. The FQHE is investigated in magnetic fields up to 35T, and the properties of composite fermions will be discussed.

  20. Study of gas tungsten arc welding procedures for tantalum alloy T-111 (Ta-8 W-2Hf) plate

    NASA Technical Reports Server (NTRS)

    Gold, R. E.; Kesterson, R. L.

    1973-01-01

    Methods of eliminating or reducing underbread cracking in multipass GTA welds in thick T-111 plate were studied. Single V butt welds prepared using experimental filler metal compositions and standard weld procedures resulted in only moderate success in reducing underbread cracking. Subsequent procedural changes incorporating manual welding, slower weld speeds, and three or fewer fill passes resulted in crack-free single V welds only when the filler metal was free of hafnium. The double V joint design with successive fill passes on opposite sides of the joint produced excellent welds. The quality of each weld was determined metallographically since the cracking, when present, was very slight and undetectable using standard NDT techniques. Tensile and bend tests were performed on selected weldments. The inherent filler metal strength and the joint geometry determined the strength of the weldment. Hardness and electron beam microprobe traverses were made on selected specimens with the result that significant filler metal-base metal dilution as well as hafnium segregation was detected. A tentative explanation of T-111 plate underbread cracking is presented based on the intrinsic effects of hafnium in the weldment.

  1. 46 CFR 111.97-9 - Overcurrent protection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...

  2. 46 CFR 111.97-9 - Overcurrent protection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...

  3. 46 CFR 111.97-9 - Overcurrent protection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...

  4. 46 CFR 111.97-9 - Overcurrent protection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...

  5. 46 CFR 111.33-3 - Nameplate data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...

  6. 46 CFR 111.33-3 - Nameplate data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...

  7. 46 CFR 111.33-3 - Nameplate data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...

  8. 46 CFR 111.33-3 - Nameplate data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...

  9. 46 CFR 111.33-3 - Nameplate data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...

  10. 46 CFR 111.20-10 - Autotransformers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...

  11. 46 CFR 111.20-10 - Autotransformers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...

  12. 46 CFR 111.20-10 - Autotransformers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...

  13. 46 CFR 111.20-10 - Autotransformers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...

  14. 46 CFR 111.20-10 - Autotransformers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...

  15. 38 CFR 4.111 - Postgastrectomy syndromes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2010-07-01 2010-07-01 false Postgastrectomy syndromes. 4.111 Section 4.111 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS SCHEDULE FOR RATING DISABILITIES Disability Ratings The Digestive System § 4.111 Postgastrectomy syndromes...

  16. 38 CFR 4.111 - Postgastrectomy syndromes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2012-07-01 2012-07-01 false Postgastrectomy syndromes. 4.111 Section 4.111 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS SCHEDULE FOR RATING DISABILITIES Disability Ratings The Digestive System § 4.111 Postgastrectomy syndromes...

  17. 38 CFR 4.111 - Postgastrectomy syndromes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2011-07-01 2011-07-01 false Postgastrectomy syndromes. 4.111 Section 4.111 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS SCHEDULE FOR RATING DISABILITIES Disability Ratings The Digestive System § 4.111 Postgastrectomy syndromes...

  18. 38 CFR 4.111 - Postgastrectomy syndromes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2013-07-01 2013-07-01 false Postgastrectomy syndromes. 4.111 Section 4.111 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS SCHEDULE FOR RATING DISABILITIES Disability Ratings The Digestive System § 4.111 Postgastrectomy syndromes...

  19. 38 CFR 4.111 - Postgastrectomy syndromes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2014-07-01 2014-07-01 false Postgastrectomy syndromes. 4.111 Section 4.111 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS SCHEDULE FOR RATING DISABILITIES Disability Ratings The Digestive System § 4.111 Postgastrectomy syndromes...

  20. 46 CFR 111.05-11 - Hull return.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Hull return. 111.05-11 Section 111.05-11 Shipping COAST... REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-11 Hull return. (a) A vessel's hull must not carry current as a conductor except for the following systems: (1) Impressed current...

  1. 46 CFR 111.50-7 - Enclosures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...

  2. 46 CFR 111.87-1 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...

  3. 46 CFR 111.87-1 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...

  4. 46 CFR 111.87-1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...

  5. 46 CFR 111.40-5 - Enclosure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...

  6. 46 CFR 111.87-1 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...

  7. 46 CFR 111.12-3 - Excitation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Excitation. 111.12-3 Section 111.12-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-3 Excitation. In general, excitation must meet...

  8. 46 CFR 111.40-5 - Enclosure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...

  9. 46 CFR 111.87-1 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...

  10. 46 CFR 111.50-7 - Enclosures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...

  11. 46 CFR 111.40-5 - Enclosure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...

  12. 46 CFR 111.40-5 - Enclosure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...

  13. 46 CFR 111.50-7 - Enclosures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...

  14. 46 CFR 111.40-5 - Enclosure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...

  15. 46 CFR 111.12-3 - Excitation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Excitation. 111.12-3 Section 111.12-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-3 Excitation. In general, excitation must meet...

  16. 46 CFR 111.50-7 - Enclosures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...

  17. 46 CFR 111.12-3 - Excitation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Excitation. 111.12-3 Section 111.12-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-3 Excitation. In general, excitation must meet...

  18. 46 CFR 111.12-3 - Excitation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Excitation. 111.12-3 Section 111.12-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-3 Excitation. In general, excitation must meet...

  19. 46 CFR 111.77-3 - Appliances.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Appliances. 111.77-3 Section 111.77-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Appliances and Appliance Circuits § 111.77-3 Appliances. All electrical appliances, including, but...

  20. 46 CFR 111.101-1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...

  1. 46 CFR 111.101-1 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...

  2. 46 CFR 111.101-1 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...

  3. 46 CFR 111.101-1 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...

  4. 46 CFR 111.101-1 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...

  5. 46 CFR 111.15-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...

  6. 46 CFR 111.15-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...

  7. 46 CFR 111.15-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...

  8. 46 CFR 111.15-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...

  9. 46 CFR 111.15-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...

  10. 46 CFR 111.25-1 - General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...

  11. 46 CFR 111.25-1 - General requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...

  12. 46 CFR 111.25-1 - General requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...

  13. 46 CFR 111.25-1 - General requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...

  14. 46 CFR 111.25-1 - General requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...

  15. 46 CFR 111.30-5 - Construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...

  16. 46 CFR 111.30-5 - Construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...

  17. 46 CFR 111.30-5 - Construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...

  18. 46 CFR 111.30-5 - Construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...

  19. 46 CFR 111.30-5 - Construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...

  20. 46 CFR 111.105-19 - Switches.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... controls any explosionproof or flameproof equipment, under § 111.105-19 must have a pole for each...

  1. 46 CFR 111.105-19 - Switches.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-19 Switches. A switch that is explosionproof or flameproof, or that...

  2. 46 CFR 111.105-19 - Switches.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-19 Switches. A switch that is explosionproof or flameproof, or that...

  3. 46 CFR 111.105-19 - Switches.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-19 Switches. A switch that is explosionproof or flameproof, or that...

  4. 46 CFR 111.105-19 - Switches.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-19 Switches. A switch that is explosionproof or flameproof, or that...

  5. 49 CFR 195.111 - Fracture propagation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Fracture propagation. 195.111 Section 195.111... PIPELINE Design Requirements § 195.111 Fracture propagation. A carbon dioxide pipeline system must be designed to mitigate the effects of fracture propagation. [Amdt. 195-45, 56 FR 26926, June 12, 1991] ...

  6. 49 CFR 195.111 - Fracture propagation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Fracture propagation. 195.111 Section 195.111... PIPELINE Design Requirements § 195.111 Fracture propagation. A carbon dioxide pipeline system must be designed to mitigate the effects of fracture propagation. [Amdt. 195-45, 56 FR 26926, June 12, 1991] ...

  7. 49 CFR 195.111 - Fracture propagation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Fracture propagation. 195.111 Section 195.111... PIPELINE Design Requirements § 195.111 Fracture propagation. A carbon dioxide pipeline system must be designed to mitigate the effects of fracture propagation. [Amdt. 195-45, 56 FR 26926, June 12, 1991] ...

  8. 49 CFR 195.111 - Fracture propagation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Fracture propagation. 195.111 Section 195.111... PIPELINE Design Requirements § 195.111 Fracture propagation. A carbon dioxide pipeline system must be designed to mitigate the effects of fracture propagation. [Amdt. 195-45, 56 FR 26926, June 12, 1991] ...

  9. 49 CFR 195.111 - Fracture propagation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Fracture propagation. 195.111 Section 195.111... PIPELINE Design Requirements § 195.111 Fracture propagation. A carbon dioxide pipeline system must be designed to mitigate the effects of fracture propagation. [Amdt. 195-45, 56 FR 26926, June 12, 1991] ...

  10. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.01-1 Section 111.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services...

  11. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.01-1 Section 111.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services...

  12. 49 CFR 230.111 - Spring rigging.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Spring rigging. 230.111 Section 230.111... Tenders Trucks, Frames and Equalizing System § 230.111 Spring rigging. (a) Arrangement of springs and equalizers. Springs and equalizers shall be arranged to ensure the proper distribution of weight to the...

  13. 49 CFR 230.111 - Spring rigging.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Spring rigging. 230.111 Section 230.111... Tenders Trucks, Frames and Equalizing System § 230.111 Spring rigging. (a) Arrangement of springs and equalizers. Springs and equalizers shall be arranged to ensure the proper distribution of weight to the...

  14. 49 CFR 230.111 - Spring rigging.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Spring rigging. 230.111 Section 230.111... Tenders Trucks, Frames and Equalizing System § 230.111 Spring rigging. (a) Arrangement of springs and equalizers. Springs and equalizers shall be arranged to ensure the proper distribution of weight to the...

  15. 49 CFR 230.111 - Spring rigging.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Spring rigging. 230.111 Section 230.111... Tenders Trucks, Frames and Equalizing System § 230.111 Spring rigging. (a) Arrangement of springs and equalizers. Springs and equalizers shall be arranged to ensure the proper distribution of weight to the...

  16. 48 CFR 49.111 - Review of proposed settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Review of proposed settlements. 49.111 Section 49.111 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.111 Review of proposed settlements. Each...

  17. 48 CFR 849.111 - Review of proposed settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Review of proposed settlements. 849.111 Section 849.111 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 849.111 Review of proposed settlements. ...

  18. 48 CFR 749.111 - Review of proposed settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Review of proposed settlements. 749.111 Section 749.111 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 749.111 Review of proposed...

  19. 48 CFR 449.111 - Review of proposed settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Review of proposed settlements. 449.111 Section 449.111 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 449.111 Review of proposed settlements. Proposed...

  20. 48 CFR 1449.111 - Review of proposed settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Review of proposed settlements. 1449.111 Section 1449.111 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 1449.111 Review of proposed settlements...

  1. 48 CFR 749.111 - Review of proposed settlements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Review of proposed settlements. 749.111 Section 749.111 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 749.111 Review of proposed...

  2. Development of a Direct Evaporator for the Organic Rankine Cycle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Donna Post Guillen; Helge Klockow; Matthew Lehar

    2011-02-01

    This paper describes research and development currently underway to place the evaporator of an Organic Rankine Cycle (ORC) system directly in the path of a hot exhaust stream produced by a gas turbine engine. The main goal of this research effort is to improve cycle efficiency and cost by eliminating the usual secondary heat transfer loop. The project’s technical objective is to eliminate the pumps, heat exchangers and all other added cost and complexity of the secondary loop by developing an evaporator that resides in the waste heat stream, yet virtually eliminates the risk of a working fluid leakage intomore » the gaseous exhaust stream. The research team comprised of Idaho National Laboratory and General Electric Company engineers leverages previous research in advanced ORC technology to develop a new direct evaporator design that will reduce the ORC system cost by up to 15%, enabling the rapid adoption of ORCs for waste heat recovery.« less

  3. 46 CFR 111.55-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false General. 111.55-1 Section 111.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-1 General. (a) Each switch must meet Article 404 of NFPA NEC 2002 (incorporated by...

  4. 46 CFR 111.51-1 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Purpose. 111.51-1 Section 111.51-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-1 Purpose. The purpose of this subpart is to provide...

  5. 46 CFR 111.40-13 - Rating.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Rating. 111.40-13 Section 111.40-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-13 Rating. Each panelboard must have a current rating not less than the feeder circuit...

  6. 46 CFR 111.55-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.55-1 Section 111.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-1 General. (a) Each switch must meet Article 404 of NFPA NEC 2002 (incorporated by...

  7. 46 CFR 111.59-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.59-1 Section 111.59-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-1 General. Each busway must meet Article 368 of NFPA NEC 2002 (incorporated by reference...

  8. 46 CFR 111.52-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.52-1 Section 111.52-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-1 General. The available short-circuit current must be computed...

  9. 46 CFR 111.52-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.52-1 Section 111.52-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-1 General. The available short-circuit current must be computed...

  10. 46 CFR 111.52-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.52-1 Section 111.52-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-1 General. The available short-circuit current must be computed...

  11. 46 CFR 111.55-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.55-1 Section 111.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-1 General. (a) Each switch must meet Article 404 of NFPA NEC 2002 (incorporated by...

  12. 46 CFR 111.55-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.55-1 Section 111.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-1 General. (a) Each switch must meet Article 404 of NFPA NEC 2002 (incorporated by...

  13. 46 CFR 111.59-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false General. 111.59-1 Section 111.59-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-1 General. Each busway must meet Article 368 of NFPA NEC 2002 (incorporated by reference...

  14. 46 CFR 111.55-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.55-1 Section 111.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-1 General. (a) Each switch must meet Article 404 of NFPA NEC 2002 (incorporated by...

  15. 46 CFR 111.52-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.52-1 Section 111.52-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-1 General. The available short-circuit current must be computed...

  16. 46 CFR 111.59-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.59-1 Section 111.59-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-1 General. Each busway must meet Article 368 of NFPA NEC 2002 (incorporated by reference...

  17. 46 CFR 111.51-1 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Purpose. 111.51-1 Section 111.51-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-1 Purpose. The purpose of this subpart is to provide...

  18. 46 CFR 111.40-13 - Rating.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Rating. 111.40-13 Section 111.40-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-13 Rating. Each panelboard must have a current rating not less than the feeder circuit...

  19. 46 CFR 111.40-13 - Rating.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Rating. 111.40-13 Section 111.40-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-13 Rating. Each panelboard must have a current rating not less than the feeder circuit...

  20. 46 CFR 111.51-1 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Purpose. 111.51-1 Section 111.51-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-1 Purpose. The purpose of this subpart is to provide...

  1. 46 CFR 111.59-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.59-1 Section 111.59-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-1 General. Each busway must meet Article 368 of NFPA NEC 2002 (incorporated by reference...

  2. 46 CFR 111.40-13 - Rating.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Rating. 111.40-13 Section 111.40-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-13 Rating. Each panelboard must have a current rating not less than the feeder circuit...

  3. 46 CFR 111.40-13 - Rating.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Rating. 111.40-13 Section 111.40-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-13 Rating. Each panelboard must have a current rating not less than the feeder circuit...

  4. 46 CFR 111.59-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.59-1 Section 111.59-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-1 General. Each busway must meet Article 368 of NFPA NEC 2002 (incorporated by reference...

  5. 46 CFR 111.51-1 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Purpose. 111.51-1 Section 111.51-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-1 Purpose. The purpose of this subpart is to provide...

  6. 46 CFR 111.52-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false General. 111.52-1 Section 111.52-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-1 General. The available short-circuit current must be computed...

  7. 46 CFR 111.106-1 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Applicability. 111.106-1 Section 111.106-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations on OSVs § 111.106-1 Applicability. This subpart applies to OSVs of at least 6...

  8. 48 CFR 949.111 - Review of proposed settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Review of proposed settlements. 949.111 Section 949.111 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 949.111 Review of proposed settlements. (a) The Heads...

  9. 46 CFR 111.40-7 - Location.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Location. 111.40-7 Section 111.40-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-7 Location. Each panelboard must be accessible but not in a bunker or a cargo hold...

  10. 46 CFR 111.25-5 - Marking.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Marking. 111.25-5 Section 111.25-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-5 Marking. (a) Each motor must have a marking or nameplate that meets either Section 430...

  11. 46 CFR 111.53-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.53-1 Section 111.53-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fuses § 111.53-1 General. (a) Each fuse must— (1) Meet the general provisions of Article 240 of NFPA NEC...

  12. 46 CFR 111.40-7 - Location.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Location. 111.40-7 Section 111.40-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-7 Location. Each panelboard must be accessible but not in a bunker or a cargo hold...

  13. 46 CFR 111.40-7 - Location.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Location. 111.40-7 Section 111.40-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-7 Location. Each panelboard must be accessible but not in a bunker or a cargo hold...

  14. 46 CFR 111.53-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false General. 111.53-1 Section 111.53-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fuses § 111.53-1 General. (a) Each fuse must— (1) Meet the general provisions of Article 240 of NFPA NEC...

  15. 46 CFR 111.40-7 - Location.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Location. 111.40-7 Section 111.40-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-7 Location. Each panelboard must be accessible but not in a bunker or a cargo hold...

  16. 46 CFR 111.25-5 - Marking.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Marking. 111.25-5 Section 111.25-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-5 Marking. (a) Each motor must have a marking or nameplate that meets either Section 430...

  17. 46 CFR 111.53-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.53-1 Section 111.53-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fuses § 111.53-1 General. (a) Each fuse must— (1) Meet the general provisions of Article 240 of NFPA NEC...

  18. 46 CFR 111.25-5 - Marking.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Marking. 111.25-5 Section 111.25-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-5 Marking. (a) Each motor must have a marking or nameplate that meets either Section 430...

  19. 46 CFR 111.25-5 - Marking.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Marking. 111.25-5 Section 111.25-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-5 Marking. (a) Each motor must have a marking or nameplate that meets either Section 430...

  20. 46 CFR 111.53-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.53-1 Section 111.53-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fuses § 111.53-1 General. (a) Each fuse must— (1) Meet the general provisions of Article 240 of NFPA NEC...

  1. 46 CFR 111.53-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.53-1 Section 111.53-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fuses § 111.53-1 General. (a) Each fuse must— (1) Meet the general provisions of Article 240 of NFPA NEC...

  2. 46 CFR 111.25-5 - Marking.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Marking. 111.25-5 Section 111.25-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-5 Marking. (a) Each motor must have a marking or nameplate that meets either Section 430...

  3. 46 CFR 111.40-7 - Location.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Location. 111.40-7 Section 111.40-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-7 Location. Each panelboard must be accessible but not in a bunker or a cargo hold...

  4. 46 CFR 111.33-7 - Alarms and shutdowns.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...

  5. 46 CFR 111.33-7 - Alarms and shutdowns.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...

  6. 46 CFR 111.33-7 - Alarms and shutdowns.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...

  7. 46 CFR 111.33-7 - Alarms and shutdowns.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...

  8. 48 CFR 1832.111-70 - NASA contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA contract clause. 1832.111-70 Section 1832.111-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE....111-70 NASA contract clause. The contracting officer shall insert the clause at 1852.232-79, Payment...

  9. 48 CFR 1832.111-70 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1832.111-70 Section 1832.111-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE....111-70 NASA contract clause. The contracting officer shall insert the clause at 1852.232-79, Payment...

  10. 48 CFR 1832.111-70 - NASA contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clause. 1832.111-70 Section 1832.111-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE....111-70 NASA contract clause. The contracting officer shall insert the clause at 1852.232-79, Payment...

  11. 48 CFR 1832.111-70 - NASA contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clause. 1832.111-70 Section 1832.111-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE....111-70 NASA contract clause. The contracting officer shall insert the clause at 1852.232-79, Payment...

  12. 48 CFR 1832.111-70 - NASA contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clause. 1832.111-70 Section 1832.111-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE....111-70 NASA contract clause. The contracting officer shall insert the clause at 1852.232-79, Payment...

  13. Method of optimizing performance of Rankine cycle power plants. [US DOE Patent

    DOEpatents

    Pope, W.L.; Pines, H.S.; Doyle, P.A.; Silvester, L.F.

    1980-06-23

    A method is described for efficiently operating a Rankine cycle power plant to maximize fuel utilization efficiency or energy conversion efficiency or minimize costs by selecting a turbine fluid inlet state which is substantially on the area adjacent and including the transposed critical temperature line.

  14. 46 CFR 111.103-3 - Machinery space ventilation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Machinery space ventilation. 111.103-3 Section 111.103-3...-GENERAL REQUIREMENTS Remote Stopping Systems § 111.103-3 Machinery space ventilation. (a) Each machinery space ventilation system must have two controls to stop the ventilation, one of which may be the supply...

  15. 46 CFR 111.103-3 - Machinery space ventilation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Machinery space ventilation. 111.103-3 Section 111.103-3...-GENERAL REQUIREMENTS Remote Stopping Systems § 111.103-3 Machinery space ventilation. (a) Each machinery space ventilation system must have two controls to stop the ventilation, one of which may be the supply...

  16. 46 CFR 111.103-3 - Machinery space ventilation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Machinery space ventilation. 111.103-3 Section 111.103-3...-GENERAL REQUIREMENTS Remote Stopping Systems § 111.103-3 Machinery space ventilation. (a) Each machinery space ventilation system must have two controls to stop the ventilation, one of which may be the supply...

  17. 46 CFR 111.103-3 - Machinery space ventilation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Machinery space ventilation. 111.103-3 Section 111.103-3...-GENERAL REQUIREMENTS Remote Stopping Systems § 111.103-3 Machinery space ventilation. (a) Each machinery space ventilation system must have two controls to stop the ventilation, one of which may be the supply...

  18. 46 CFR 111.103-3 - Machinery space ventilation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Machinery space ventilation. 111.103-3 Section 111.103-3...-GENERAL REQUIREMENTS Remote Stopping Systems § 111.103-3 Machinery space ventilation. (a) Each machinery space ventilation system must have two controls to stop the ventilation, one of which may be the supply...

  19. 48 CFR 1371.111 - Title.

    Code of Federal Regulations, 2010 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Title. 1371.111 Section... REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.111 Title. Insert clause 1352.271-80, Title, in all solicitations and contracts for ship repair. ...

  20. 12 CFR 225.111 - Limit on investment by bank holding company system in stock of small business investment companies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Limit on investment by bank holding company system in stock of small business investment companies. 225.111 Section 225.111 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM BANK HOLDING COMPANIES AND...

  1. 46 CFR 111.12-11 - Generator protection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Generator protection. 111.12-11 Section 111.12-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-11 Generator protection. (a...

  2. 46 CFR 111.12-11 - Generator protection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Generator protection. 111.12-11 Section 111.12-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-11 Generator protection. (a...

  3. 46 CFR 111.12-11 - Generator protection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Generator protection. 111.12-11 Section 111.12-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-11 Generator protection. (a...

  4. 46 CFR 111.30-29 - Emergency switchboards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Emergency switchboards. 111.30-29 Section 111.30-29 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-29 Emergency switchboards. (a) Each emergency generator must...

  5. 46 CFR 111.105-1 - Applicability; definition.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Applicability; definition. 111.105-1 Section 111.105-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-1 Applicability; definition. This subpart applies to...

  6. 46 CFR 111.105-1 - Applicability; definition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Applicability; definition. 111.105-1 Section 111.105-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-1 Applicability; definition. This subpart applies to...

  7. 46 CFR 111.05-13 - Grounding connection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Grounding connection. 111.05-13 Section 111.05-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... power sources operating in parallel in the system. ...

  8. 46 CFR 111.05-13 - Grounding connection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Grounding connection. 111.05-13 Section 111.05-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... power sources operating in parallel in the system. ...

  9. 46 CFR 111.05-13 - Grounding connection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Grounding connection. 111.05-13 Section 111.05-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... power sources operating in parallel in the system. ...

  10. 46 CFR 111.05-13 - Grounding connection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Grounding connection. 111.05-13 Section 111.05-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... power sources operating in parallel in the system. ...

  11. 46 CFR 111.95-3 - General requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...

  12. 46 CFR 111.95-3 - General requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...

  13. 46 CFR 111.95-3 - General requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...

  14. 46 CFR 111.95-3 - General requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...

  15. 46 CFR 111.95-3 - General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...

  16. AFTI/F-111 MAW flight control system and redundancy management description

    NASA Technical Reports Server (NTRS)

    Larson, Richard R.

    1987-01-01

    The wing on the NASA F-111 transonic aircraft technology (TACT) airplane was modified to provide flexible leading and trailing edge flaps; this modified wing is known as the mission adaptive wing (MAW). A dual digital primary fly-by-wire flight control system was developed with analog backup reversion for redundancy. This report discusses the functions, design, and redundancy management of the flight control system for these flaps.

  17. Spin reorientation and magnetoelastic properties of ferromagnetic T b1 -xN dxC o2 systems with a morphotropic phase boundary

    NASA Astrophysics Data System (ADS)

    Murtaza, Adil; Yang, Sen; Chang, Tieyan; Ghani, Awais; Khan, Muhammad Tahir; Zhang, Rui; Zhou, Chao; Song, Xiaoping; Suchomel, Matthew; Ren, Yang

    2018-03-01

    The spin reorientation (SR) and magnetoelastic properties of pseudobinary ferromagnetic T b1 -xN dxC o2 (0 ≤x ≤1.0 ) systems involving a morphotropic phase boundary (MPB) were studied by high-resolution synchrotron x-ray diffraction (XRD), magnetization, and magnetostriction measurements. The easy magnetization direction of the Laves phase lies along the 〈111 〉 axis with x <0.65 , whereas it lies along the 〈100 〉 axis for x >0.65 below Curie temperature (TC). The temperature-dependent magnetization curves showed SR; this can be explained by a two-sublattice model. Based on the synchrotron (XRD) and magnetization measurements, the SR phase diagram for a MPB composition of T b0.35N d0.65C o2 was obtained. Contrary to previously reported ferromagnetic systems involving MPB, the MPB composition of T b0.35N d0.65C o2 exhibits a low saturation magnetization (MS), indicating a compensation of the Tb and Nd magnetic moments at MPB. The anisotropic magnetostriction (λS) first decreased until x =0.8 and then continuously increased in the negative direction with further increase of Nd concentration. The decrease in magnetostriction can be attributed to the decrease of spontaneous magnetostriction λ111 and increase of λ100 with opposite sign to λ111. This paper indicates an anomalous type of MPB in the ferromagnetic T b1 -xN dxC o2 system and provides an active way to design novel functional materials with exotic properties.

  18. 48 CFR 749.111-70 - Termination settlement review boards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Termination settlement review boards. 749.111-70 Section 749.111-70 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 749.111-70 Termination...

  19. Variable-camber systems integration and operational performance of the AFTI/F-111 mission adaptive wing

    NASA Technical Reports Server (NTRS)

    Smith, John W.; Lock, Wilton P.; Payne, Gordon A.

    1992-01-01

    The advanced fighter technology integration, the AFTI/F-111 aircraft, is a preproduction F-111A testbed research airplane that was fitted with a smooth variable-camber mission adaptive wing. The camber was positioned and controlled by flexing the upper skins through rotary actuators and linkages driven by power drive units. The wing camber and control system are described. The measured servoactuator frequency responses are presented along with analytical predictions derived from the integrated characteristics of the control elements. A mission adaptive wing system chronology is used to illustrate and assess the reliability and dependability of the servoactuator system during 1524 hours of ground tests and 145 hours of flight testing.

  20. 46 CFR 111.33-9 - Ventilation exhaust.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Ventilation exhaust. 111.33-9 Section 111.33-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... under Subpart 111.105 of this part; and (b) Not impinge upon any other electric device. ...

  1. 46 CFR 111.87-3 - General requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...

  2. 46 CFR 111.12-9 - Generator cables.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...

  3. 46 CFR 111.87-3 - General requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...

  4. 46 CFR 111.87-3 - General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...

  5. 46 CFR 111.87-3 - General requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...

  6. 46 CFR 111.30-11 - Deck coverings.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...

  7. 46 CFR 111.12-9 - Generator cables.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...

  8. 46 CFR 111.30-11 - Deck coverings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...

  9. 46 CFR 111.30-11 - Deck coverings.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...

  10. 46 CFR 111.87-3 - General requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...

  11. 46 CFR 111.33-9 - Ventilation exhaust.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Ventilation exhaust. 111.33-9 Section 111.33-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... under Subpart 111.105 of this part; and (b) Not impinge upon any other electric device. ...

  12. 46 CFR 111.30-11 - Deck coverings.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...

  13. 46 CFR 111.33-9 - Ventilation exhaust.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Ventilation exhaust. 111.33-9 Section 111.33-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... under Subpart 111.105 of this part; and (b) Not impinge upon any other electric device. ...

  14. 46 CFR 111.12-9 - Generator cables.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...

  15. 46 CFR 111.33-9 - Ventilation exhaust.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Ventilation exhaust. 111.33-9 Section 111.33-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... under Subpart 111.105 of this part; and (b) Not impinge upon any other electric device. ...

  16. 46 CFR 111.30-11 - Deck coverings.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...

  17. 46 CFR 111.12-9 - Generator cables.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...

  18. 46 CFR 111.105-41 - Battery rooms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...

  19. 46 CFR 111.105-41 - Battery rooms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...

  20. 46 CFR 111.105-41 - Battery rooms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...

  1. 46 CFR 111.105-41 - Battery rooms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...

  2. 46 CFR 111.105-41 - Battery rooms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...

  3. 46 CFR 111.54-3 - Remote control.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...

  4. 46 CFR 111.54-3 - Remote control.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...

  5. 46 CFR 111.54-3 - Remote control.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...

  6. 46 CFR 111.54-3 - Remote control.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...

  7. 46 CFR 111.54-3 - Remote control.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...

  8. 46 CFR 111.75-18 - Signaling lights.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Signaling lights. 111.75-18 Section 111.75-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Lighting Circuits and Protection § 111.75-18 Signaling lights. Each self-propelled vessel over 150...

  9. 46 CFR 111.75-18 - Signaling lights.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Signaling lights. 111.75-18 Section 111.75-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Lighting Circuits and Protection § 111.75-18 Signaling lights. Each self-propelled vessel over 150...

  10. 46 CFR 111.75-18 - Signaling lights.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Signaling lights. 111.75-18 Section 111.75-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Lighting Circuits and Protection § 111.75-18 Signaling lights. Each self-propelled vessel over 150...

  11. 46 CFR 111.75-18 - Signaling lights.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Signaling lights. 111.75-18 Section 111.75-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Lighting Circuits and Protection § 111.75-18 Signaling lights. Each self-propelled vessel over 150...

  12. 46 CFR 111.75-18 - Signaling lights.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Signaling lights. 111.75-18 Section 111.75-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Lighting Circuits and Protection § 111.75-18 Signaling lights. Each self-propelled vessel over 150...

  13. 48 CFR 749.111-71 - Required review and approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Required review and approval. 749.111-71 Section 749.111-71 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 749.111-71 Required review and...

  14. Test results of an organic Rankine-cycle power module for a small community solar thermal power experiment

    NASA Technical Reports Server (NTRS)

    Clark, T. B.

    1985-01-01

    The organic Rankine-cycle (ORC) power conversion assembly was tested. Qualification testing of the electrical transport subsystem was also completed. Test objectives were to verify compatibility of all system elements with emphasis on control of the power conversion assembly, to evaluate the performance and efficiency of the components, and to validate operating procedures. After 34 hours of power generation under a wide range of conditions, the net module efficiency exceeded 18% after accounting for all parasitic losses.

  15. 46 CFR 111.40-1 - Panelboard standard.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Panelboard standard. 111.40-1 Section 111.40-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-1 Panelboard standard. Each panelboard must meet section 17.1 of IEEE 45-2002...

  16. 46 CFR 111.40-15 - Overcurrent device.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...

  17. 46 CFR 111.40-15 - Overcurrent device.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...

  18. 46 CFR 111.79-3 - Grounding pole.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Grounding pole. 111.79-3 Section 111.79-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-3 Grounding pole. Each receptacle outlet that operates at 100 volts or more...

  19. 46 CFR 111.40-9 - Locking device.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Locking device. 111.40-9 Section 111.40-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-9 Locking device. The door of each panelboard enclosure that is accessible to...

  20. 46 CFR 111.55-3 - Circuit connections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Circuit connections. 111.55-3 Section 111.55-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-3 Circuit connections. The load side of each circuit must be connected to the...

  1. 46 CFR 111.40-15 - Overcurrent device.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...

  2. 46 CFR 111.55-3 - Circuit connections.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Circuit connections. 111.55-3 Section 111.55-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-3 Circuit connections. The load side of each circuit must be connected to the...

  3. 46 CFR 111.40-1 - Panelboard standard.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Panelboard standard. 111.40-1 Section 111.40-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-1 Panelboard standard. Each panelboard must meet section 17.1 of IEEE 45-2002...

  4. 46 CFR 111.79-3 - Grounding pole.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Grounding pole. 111.79-3 Section 111.79-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-3 Grounding pole. Each receptacle outlet that operates at 100 volts or more...

  5. 46 CFR 111.12-1 - Prime movers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Prime movers. 111.12-1 Section 111.12-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-1 Prime movers. (a) Prime movers must meet section 58...

  6. 46 CFR 111.40-9 - Locking device.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Locking device. 111.40-9 Section 111.40-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-9 Locking device. The door of each panelboard enclosure that is accessible to...

  7. 46 CFR 111.12-1 - Prime movers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Prime movers. 111.12-1 Section 111.12-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-1 Prime movers. (a) Prime movers must meet section 58...

  8. 46 CFR 111.40-1 - Panelboard standard.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Panelboard standard. 111.40-1 Section 111.40-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-1 Panelboard standard. Each panelboard must meet section 17.1 of IEEE 45-2002...

  9. 46 CFR 111.79-3 - Grounding pole.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Grounding pole. 111.79-3 Section 111.79-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-3 Grounding pole. Each receptacle outlet that operates at 100 volts or more...

  10. 46 CFR 111.40-9 - Locking device.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Locking device. 111.40-9 Section 111.40-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-9 Locking device. The door of each panelboard enclosure that is accessible to...

  11. 46 CFR 111.40-15 - Overcurrent device.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...

  12. 46 CFR 111.55-3 - Circuit connections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Circuit connections. 111.55-3 Section 111.55-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-3 Circuit connections. The load side of each circuit must be connected to the...

  13. 46 CFR 111.40-9 - Locking device.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Locking device. 111.40-9 Section 111.40-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-9 Locking device. The door of each panelboard enclosure that is accessible to...

  14. 46 CFR 111.12-1 - Prime movers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Prime movers. 111.12-1 Section 111.12-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-1 Prime movers. (a) Prime movers must meet section 58...

  15. 46 CFR 111.40-15 - Overcurrent device.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...

  16. 46 CFR 111.40-1 - Panelboard standard.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Panelboard standard. 111.40-1 Section 111.40-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-1 Panelboard standard. Each panelboard must meet section 17.1 of IEEE 45-2002...

  17. 46 CFR 111.79-3 - Grounding pole.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Grounding pole. 111.79-3 Section 111.79-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-3 Grounding pole. Each receptacle outlet that operates at 100 volts or more...

  18. 46 CFR 111.12-1 - Prime movers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Prime movers. 111.12-1 Section 111.12-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-1 Prime movers. (a) Prime movers must meet section 58...

  19. 46 CFR 111.40-9 - Locking device.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Locking device. 111.40-9 Section 111.40-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-9 Locking device. The door of each panelboard enclosure that is accessible to...

  20. 46 CFR 111.40-1 - Panelboard standard.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Panelboard standard. 111.40-1 Section 111.40-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-1 Panelboard standard. Each panelboard must meet section 17.1 of IEEE 45-2002...

  1. 46 CFR 111.55-3 - Circuit connections.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Circuit connections. 111.55-3 Section 111.55-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-3 Circuit connections. The load side of each circuit must be connected to the...

  2. 46 CFR 111.55-3 - Circuit connections.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Circuit connections. 111.55-3 Section 111.55-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-3 Circuit connections. The load side of each circuit must be connected to the...

  3. 46 CFR 111.12-1 - Prime movers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Prime movers. 111.12-1 Section 111.12-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-1 Prime movers. (a) Prime movers must meet section 58...

  4. 46 CFR 111.79-3 - Grounding pole.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Grounding pole. 111.79-3 Section 111.79-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-3 Grounding pole. Each receptacle outlet that operates at 100 volts or more...

  5. 46 CFR 111.05-20 - Grounded distribution systems on OSVs designed to carry flammable or combustible liquids with...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Grounded distribution systems on OSVs designed to carry flammable or combustible liquids with closed-cup flashpoints not exceeding 60 °C (140 °F). 111.05-20 Section 111.05-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS...

  6. A quantitative risk-assessment system (QR-AS) evaluating operation safety of Organic Rankine Cycle using flammable mixture working fluid.

    PubMed

    Tian, Hua; Wang, Xueying; Shu, Gequn; Wu, Mingqiang; Yan, Nanhua; Ma, Xiaonan

    2017-09-15

    Mixture of hydrocarbon and carbon dioxide shows excellent cycle performance in Organic Rankine Cycle (ORC) used for engine waste heat recovery, but the unavoidable leakage in practical application is a threat for safety due to its flammability. In this work, a quantitative risk assessment system (QR-AS) is established aiming at providing a general method of risk assessment for flammable working fluid leakage. The QR-AS covers three main aspects: analysis of concentration distribution based on CFD simulations, explosive risk assessment based on the TNT equivalent method and risk mitigation based on evaluation results. A typical case of propane/carbon dioxide mixture leaking from ORC is investigated to illustrate the application of QR-AS. According to the assessment results, proper ventilation speed, safe mixture ratio and location of gas-detecting devices have been proposed to guarantee the security in case of leakage. The results revealed that this presented QR-AS was reliable for the practical application and the evaluation results could provide valuable guidance for the design of mitigation measures to improve the safe performance of ORC system. Copyright © 2017 Elsevier B.V. All rights reserved.

  7. 46 CFR 111.25-15 - Duty cycle.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Duty cycle. 111.25-15 Section 111.25-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-15 Duty cycle. Each motor must be rated for continuous duty, except a motor for an...

  8. 46 CFR 111.25-15 - Duty cycle.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Duty cycle. 111.25-15 Section 111.25-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-15 Duty cycle. Each motor must be rated for continuous duty, except a motor for an...

  9. 46 CFR 111.25-15 - Duty cycle.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Duty cycle. 111.25-15 Section 111.25-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-15 Duty cycle. Each motor must be rated for continuous duty, except a motor for an...

  10. 46 CFR 111.25-15 - Duty cycle.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Duty cycle. 111.25-15 Section 111.25-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-15 Duty cycle. Each motor must be rated for continuous duty, except a motor for an...

  11. 46 CFR 111.25-15 - Duty cycle.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Duty cycle. 111.25-15 Section 111.25-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-15 Duty cycle. Each motor must be rated for continuous duty, except a motor for an...

  12. 30 CFR 260.111 - What conditions apply to the bidding systems that MMS uses?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What conditions apply to the bidding systems... INTERIOR OFFSHORE OUTER CONTINENTAL SHELF OIL AND GAS LEASING Bidding Systems General Provisions § 260.111 What conditions apply to the bidding systems that MMS uses? (a) For each of the bidding systems in...

  13. 46 CFR 111.75-17 - Navigation lights.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Navigation lights. 111.75-17 Section 111.75-17 Shipping... REQUIREMENTS Lighting Circuits and Protection § 111.75-17 Navigation lights. Each navigation light system must...-5(a) of this chapter, each navigation light panel must be supplied by a feeder from the emergency...

  14. 46 CFR 111.75-17 - Navigation lights.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Navigation lights. 111.75-17 Section 111.75-17 Shipping... REQUIREMENTS Lighting Circuits and Protection § 111.75-17 Navigation lights. Each navigation light system must...-5(a) of this chapter, each navigation light panel must be supplied by a feeder from the emergency...

  15. 46 CFR 111.75-17 - Navigation lights.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Navigation lights. 111.75-17 Section 111.75-17 Shipping... REQUIREMENTS Lighting Circuits and Protection § 111.75-17 Navigation lights. Each navigation light system must...-5(a) of this chapter, each navigation light panel must be supplied by a feeder from the emergency...

  16. 46 CFR 111.75-17 - Navigation lights.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Navigation lights. 111.75-17 Section 111.75-17 Shipping... REQUIREMENTS Lighting Circuits and Protection § 111.75-17 Navigation lights. Each navigation light system must...-5(a) of this chapter, each navigation light panel must be supplied by a feeder from the emergency...

  17. 46 CFR 111.75-17 - Navigation lights.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Navigation lights. 111.75-17 Section 111.75-17 Shipping... REQUIREMENTS Lighting Circuits and Protection § 111.75-17 Navigation lights. Each navigation light system must...-5(a) of this chapter, each navigation light panel must be supplied by a feeder from the emergency...

  18. Localization of brain tumors with Indium-111 labeled somatostatin analogue and iodine-123-methyl tyrosine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kroiss, A.; Boeck, F.; Auinger, C.

    1994-05-01

    The aim of this study was to compare the visualization of brain tumors with Iodine-123-Methyl Tyrosine (l-123-MT) and Indium-111-Octreotide (ln-111-Oc). We used l-123-MT (FZ-Seibersdorf), administering 222 MBq and planar images were performed 10min and 1hr after application. In 5 pts SPECT images were performed too. Not earlier than 48hrs 244 MBq In-111-Oc (OctreoScan{sup {reg_sign}}, Mallincrodt) were injected and planar images 4 and 24 hrs after application performed. In 9 pts SPECT images were performed (4hrs p.appl.). A digital Anger camera was used for data acquisition and processing (APEX 409A, Elscint). A total of 12 pts (8 male, 4 female agemore » ranging from 45-71 yrs) were investigated. using a region of interest technique tumor-to-brain tissue rations (T/BT) were calculated. Diagnosis of tumor was established by neurosurgical procedures. 6 pts with glioblastoma showed a high uptake with in-111-Oc (T/BT 1.7 {plus_minus}0.5) and also with l-123-MT T/BT: 1.5{plus_minus}0.4 (10 {prime}) and 1.45 {plus_minus}0.45 (1h). In 2 menigiomas the images with ln-111-Oc were very good (T/BT: 3.1, 3.6 (4hr pl)) and were negative with l-123-MT. In 4 metastases we found a low uptake in 2 pts with l-123-MT T/BT (10{prime}): 1.3 and 1.25; T/BT (1h): 1.25 and 1.2 and ln-111-Oc (T/BT (4h pl): 1.6 and 1.4). These were pts with brain metastases of adeno carcinoma. In two pts with brain metastases of small cell lung cancer we found good images with both substances I-123-MT T/BT: 1.6 and 1.7 (1h) and ln-111-Oc T/BT: 2.5 and 2.6 (4h pl). In summary, glioblastoma showed concordant images with both substances and also metastases, meningiomas showed discordant images. SPECT acquisition is possible with both substances and sometimes advisable.« less

  19. 46 CFR 111.79-11 - Lifeboat receptacles.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Lifeboat receptacles. 111.79-11 Section 111.79-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... for connection to a vessel's electrical system must allow the plug to pull free when the lifeboat is...

  20. 46 CFR 111.79-11 - Lifeboat receptacles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Lifeboat receptacles. 111.79-11 Section 111.79-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... for connection to a vessel's electrical system must allow the plug to pull free when the lifeboat is...

  1. 46 CFR 111.79-11 - Lifeboat receptacles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Lifeboat receptacles. 111.79-11 Section 111.79-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... for connection to a vessel's electrical system must allow the plug to pull free when the lifeboat is...

  2. 46 CFR 111.79-11 - Lifeboat receptacles.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Lifeboat receptacles. 111.79-11 Section 111.79-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... for connection to a vessel's electrical system must allow the plug to pull free when the lifeboat is...

  3. 46 CFR 111.79-11 - Lifeboat receptacles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Lifeboat receptacles. 111.79-11 Section 111.79-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... for connection to a vessel's electrical system must allow the plug to pull free when the lifeboat is...

  4. 46 CFR 111.05-15 - Neutral grounding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Neutral grounding. 111.05-15 Section 111.05-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral...

  5. 46 CFR 111.05-15 - Neutral grounding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Neutral grounding. 111.05-15 Section 111.05-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral...

  6. 46 CFR 111.05-15 - Neutral grounding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Neutral grounding. 111.05-15 Section 111.05-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral...

  7. 46 CFR 111.05-15 - Neutral grounding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Neutral grounding. 111.05-15 Section 111.05-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral...

  8. 46 CFR 111.05-15 - Neutral grounding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Neutral grounding. 111.05-15 Section 111.05-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral...

  9. Core level line shapes and surface band structures of Sn/Ge(111) and Sn/Si(111)

    NASA Astrophysics Data System (ADS)

    Uhrberg, Roger

    2001-03-01

    We have performed a comparative study of Sn/Ge(111) and the closely related Sn/Si(111) system, using photoelectron spectroscopy (PES) and low energy electron diffraction (LEED). In similarity with the results from the Sn/Ge(111) surface, the Sn 4d spectra from Sn/Si(111) exhibit two major components and the valence band spectra show two surface state bands at both room temperature (RT) and 70 K. These features, which have been associated with the low temperature 3x3 phase in the case of Sn/Ge(111), are not expected for the rt3xrt3 RT surfaces. In contrast to Sn/Ge(111), we do not observe any transition to a 3x3 phase in LEED for Sn/Si(111) at temperatures down to 70 K (the lowest temperature in this study). Despite the absence of a 3x3 phase for Sn/Si(111) the core-level and the valence band data are very similar to those of Sn/Ge(111). The Sn 4d spectra show, however, one interesting difference. The intensity ratio of the two Sn 4d components is reversed for the Sn/Si(111) surface compared the Ge counterpart. This and the other PES results will be discussed in terms of the two different types of 3x3 periodicities that have been reported to be induced by substitutional defects on the Sn/Ge(111) surface [1]. [1] A.V. Melechko et al., Phys. Rev. B61, 2235 (2000)

  10. 46 CFR 111.50-9 - Disconnecting and guarding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...

  11. 46 CFR 111.50-9 - Disconnecting and guarding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...

  12. 46 CFR 111.50-9 - Disconnecting and guarding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...

  13. 46 CFR 111.50-9 - Disconnecting and guarding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...

  14. 46 CFR 111.12-13 - Propulsion generator protection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...

  15. 46 CFR 111.12-13 - Propulsion generator protection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...

  16. 46 CFR 111.12-13 - Propulsion generator protection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...

  17. 46 CFR 111.12-13 - Propulsion generator protection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...

  18. 46 CFR 111.12-13 - Propulsion generator protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...

  19. Development of a solar receiver for an organic rankine cycle engine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haskins, H.J.; Taylor, R.M.; Osborn, D.B.

    A solar receiver is described for use with an organic Rankine cycle (ORC) engine as part of the Small Community Solar Thermal Power Experiment (SCSE). The selected receiver concept is a direct-heated, once-through, monotube boiler normally operating at supercritical pressure. Fabrication methods for the receiver core have been developed and validated with flat braze samples, cylindrical segment samples, and a complete full-scale core assembly.

  20. 46 CFR 111.30-1 - Location and installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...

  1. 46 CFR 111.30-1 - Location and installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...

  2. 46 CFR 111.30-1 - Location and installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...

  3. 46 CFR 111.30-1 - Location and installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...

  4. 46 CFR 111.30-1 - Location and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...

  5. 46 CFR 111.106-17 - Piping: electrical bonding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Piping: electrical bonding. 111.106-17 Section 111.106-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations on OSVs § 111.106-17 Piping: electrical bonding. (a...

  6. 46 CFR 111.01-9 - Degrees of protection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Degrees of protection. 111.01-9 Section 111.01-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-9 Degrees of protection. (a) Interior electrical equipment exposed...

  7. 46 CFR 111.01-11 - Corrosion-resistant parts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...

  8. 46 CFR 111.59-3 - No mechanical cooling.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false No mechanical cooling. 111.59-3 Section 111.59-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-3 No mechanical cooling. A busway must not need mechanical cooling...

  9. 46 CFR 111.79-1 - Receptacle outlets; general.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Receptacle outlets; general. 111.79-1 Section 111.79-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-1 Receptacle outlets; general. (a) There must be a sufficient...

  10. 46 CFR 111.01-3 - Placement of equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...

  11. 46 CFR 111.59-3 - No mechanical cooling.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false No mechanical cooling. 111.59-3 Section 111.59-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-3 No mechanical cooling. A busway must not need mechanical cooling...

  12. 46 CFR 111.50-1 - Protection of equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Protection of equipment. 111.50-1 Section 111.50-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... electric equipment must meet the following listed subparts of this chapter: (a) Appliances, Subpart 111.77...

  13. 46 CFR 111.01-11 - Corrosion-resistant parts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...

  14. 46 CFR 111.79-1 - Receptacle outlets; general.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Receptacle outlets; general. 111.79-1 Section 111.79-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-1 Receptacle outlets; general. (a) There must be a sufficient...

  15. 46 CFR 111.01-3 - Placement of equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...

  16. 46 CFR 111.50-1 - Protection of equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Protection of equipment. 111.50-1 Section 111.50-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... electric equipment must meet the following listed subparts of this chapter: (a) Appliances, Subpart 111.77...

  17. 46 CFR 111.59-3 - No mechanical cooling.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false No mechanical cooling. 111.59-3 Section 111.59-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-3 No mechanical cooling. A busway must not need mechanical cooling...

  18. 46 CFR 111.50-1 - Protection of equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Protection of equipment. 111.50-1 Section 111.50-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... electric equipment must meet the following listed subparts of this chapter: (a) Appliances, Subpart 111.77...

  19. 46 CFR 111.79-1 - Receptacle outlets; general.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Receptacle outlets; general. 111.79-1 Section 111.79-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-1 Receptacle outlets; general. (a) There must be a sufficient...

  20. 46 CFR 111.50-1 - Protection of equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Protection of equipment. 111.50-1 Section 111.50-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... electric equipment must meet the following listed subparts of this chapter: (a) Appliances, Subpart 111.77...

  1. 46 CFR 111.01-11 - Corrosion-resistant parts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...

  2. 46 CFR 111.01-3 - Placement of equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...

  3. 46 CFR 111.59-3 - No mechanical cooling.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false No mechanical cooling. 111.59-3 Section 111.59-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-3 No mechanical cooling. A busway must not need mechanical cooling...

  4. 46 CFR 111.01-11 - Corrosion-resistant parts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...

  5. 46 CFR 111.79-1 - Receptacle outlets; general.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Receptacle outlets; general. 111.79-1 Section 111.79-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-1 Receptacle outlets; general. (a) There must be a sufficient...

  6. 46 CFR 111.79-1 - Receptacle outlets; general.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Receptacle outlets; general. 111.79-1 Section 111.79-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-1 Receptacle outlets; general. (a) There must be a sufficient...

  7. 46 CFR 111.75-5 - Lighting branch circuits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Lighting branch circuits. 111.75-5 Section 111.75-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Lighting Circuits and Protection § 111.75-5 Lighting branch circuits. (a) Loads. A...

  8. 46 CFR 111.10-3 - Two generating sources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Two generating sources. 111.10-3 Section 111.10-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-3 Two generating sources. In addition to the emergency power...

  9. 46 CFR 111.10-3 - Two generating sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Two generating sources. 111.10-3 Section 111.10-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-3 Two generating sources. In addition to the emergency power...

  10. 46 CFR 111.59-3 - No mechanical cooling.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false No mechanical cooling. 111.59-3 Section 111.59-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-3 No mechanical cooling. A busway must not need mechanical cooling...

  11. 46 CFR 111.01-3 - Placement of equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...

  12. 46 CFR 111.01-11 - Corrosion-resistant parts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...

  13. 46 CFR 111.01-3 - Placement of equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...

  14. 46 CFR 111.01-7 - Accessibility and spacing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Accessibility and spacing. 111.01-7 Section 111.01-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-7 Accessibility and spacing. (a) The design and arrangement of...

  15. 46 CFR 111.01-7 - Accessibility and spacing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Accessibility and spacing. 111.01-7 Section 111.01-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-7 Accessibility and spacing. (a) The design and arrangement of...

  16. 12 CFR 269b.111 - Filing of charges.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... to the Secretary of the Federal Reserve System Labor Relations Panel, 20th Street and Constitution... 12 Banks and Banking 4 2014-01-01 2014-01-01 false Filing of charges. 269b.111 Section 269b.111 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM...

  17. 12 CFR 269b.111 - Filing of charges.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... to the Secretary of the Federal Reserve System Labor Relations Panel, 20th Street and Constitution... 12 Banks and Banking 4 2012-01-01 2012-01-01 false Filing of charges. 269b.111 Section 269b.111 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM...

  18. 12 CFR 269b.111 - Filing of charges.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of the Federal Reserve System Labor Relations Panel, 20th Street and Constitution Avenue NW... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Filing of charges. 269b.111 Section 269b.111 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM...

  19. Analysis of a rotating spool expander for Organic Rankine Cycle applications

    NASA Astrophysics Data System (ADS)

    Krishna, Abhinav

    Increasing interest in recovering or utilizing low-grade heat for power generation has prompted a search for ways in which the power conversion process may be enhanced. Amongst the conversion systems, the Organic Rankine Cycle (ORC) has generated an enormous amount of interest amongst researchers and system designers. Nevertheless, component level technologies need to be developed and match the range of potential applications. In particular, technical challenges associated with scaling expansion machines (turbines) from utility scale to commercial scale have prevented widespread adoption of the technology. In this regard, this work focuses on a novel rotating spool expansion machine at the heart of an Organic Rankine Cycle. A comprehensive, deterministic simulation model of the rotating spool expander is developed. The comprehensive model includes a detailed geometry model of the spool expander and the suction valve mechanism. Sub-models for mass flow, leakage, heat transfer and friction within the expander are also developed. Apart from providing the ability to characterize the expander in a particular system, the model provides a valuable tool to study the impact of various design variables on the performance of the machine. The investigative approach also involved an experimental program to assess the performance of a working prototype. In general, the experimental data showed that the expander performance was sub-par, largely due to the mismatch of prevailing operating conditions and the expander design criteria. Operating challenges during the shakedown tests and subsequent sub-optimal design changes also detracted from performance. Nevertheless, the results of the experimental program were sufficient for a proof-of-concept assessment of the expander and for model validation over a wide range of operating conditions. The results of the validated model reveal several interesting details concerning the expander design and performance. For example, the match

  20. 46 CFR 111.30-15 - Nameplates.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Nameplates. 111.30-15 Section 111.30-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... function. (b) Each nameplate for a circuit breaker must show the electrical load served and the setting of...

  1. 46 CFR 111.30-15 - Nameplates.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Nameplates. 111.30-15 Section 111.30-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... function. (b) Each nameplate for a circuit breaker must show the electrical load served and the setting of...

  2. 46 CFR 111.30-15 - Nameplates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Nameplates. 111.30-15 Section 111.30-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... function. (b) Each nameplate for a circuit breaker must show the electrical load served and the setting of...

  3. 46 CFR 111.30-15 - Nameplates.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Nameplates. 111.30-15 Section 111.30-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... function. (b) Each nameplate for a circuit breaker must show the electrical load served and the setting of...

  4. 46 CFR 111.30-15 - Nameplates.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Nameplates. 111.30-15 Section 111.30-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... function. (b) Each nameplate for a circuit breaker must show the electrical load served and the setting of...

  5. 46 CFR 111.77-3 - Appliances.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Appliances. 111.77-3 Section 111.77-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL..., must meet UL safety and construction standards or equivalent standards under § 110.20-1 of this chapter...

  6. 46 CFR 111.77-3 - Appliances.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Appliances. 111.77-3 Section 111.77-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL..., must meet UL safety and construction standards or equivalent standards under § 110.20-1 of this chapter...

  7. 46 CFR 111.77-3 - Appliances.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Appliances. 111.77-3 Section 111.77-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL..., must meet UL safety and construction standards or equivalent standards under § 110.20-1 of this chapter...

  8. 46 CFR 111.77-3 - Appliances.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Appliances. 111.77-3 Section 111.77-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL..., must meet UL safety and construction standards or equivalent standards under § 110.20-1 of this chapter...

  9. 46 CFR 111.10-1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Definitions. 111.10-1 Section 111.10-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... organic peroxides and Class 4.1 self-reactive substances, and other industrial type loads are not included...

  10. 46 CFR 111.10-1 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Definitions. 111.10-1 Section 111.10-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... organic peroxides and Class 4.1 self-reactive substances, and other industrial type loads are not included...

  11. 46 CFR 111.10-1 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Definitions. 111.10-1 Section 111.10-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... organic peroxides and Class 4.1 self-reactive substances, and other industrial type loads are not included...

  12. 46 CFR 111.10-1 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Definitions. 111.10-1 Section 111.10-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... organic peroxides and Class 4.1 self-reactive substances, and other industrial type loads are not included...

  13. 46 CFR 111.10-1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Definitions. 111.10-1 Section 111.10-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... organic peroxides and Class 4.1 self-reactive substances, and other industrial type loads are not included...

  14. 46 CFR 111.30-19 - Buses and wiring.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Buses and wiring. 111.30-19 Section 111.30-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-19 Buses and wiring. (a) General. Each bus must meet the requirements of...

  15. 46 CFR 111.30-19 - Buses and wiring.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Buses and wiring. 111.30-19 Section 111.30-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-19 Buses and wiring. (a) General. Each bus must meet the requirements of...

  16. 46 CFR 111.30-19 - Buses and wiring.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Buses and wiring. 111.30-19 Section 111.30-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-19 Buses and wiring. (a) General. Each bus must meet the requirements of...

  17. 46 CFR 111.30-19 - Buses and wiring.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Buses and wiring. 111.30-19 Section 111.30-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-19 Buses and wiring. (a) General. Each bus must meet the requirements of...

  18. A New Drug Design Targeting the Adenosinergic System for Huntington's Disease

    PubMed Central

    Lin, Jiun-Tsai; Lin, Chia-I; Liu, Eric Minwei; Lin, Chun-Jung; Chen, Wan-Ping; Shen, Yuh-Chiang; Chen, Hui-Mei; Chen, Jhih-Bin; Lai, Hsing-Lin; Yang, Chieh-Wen; Chiang, Ming-Chang; Wu, Yu-Shuo; Chang, Chen; Chen, Jiang-Fan; Fang, Jim-Min; Lin, Yun-Lian; Chern, Yijuang

    2011-01-01

    Background Huntington's disease (HD) is a neurodegenerative disease caused by a CAG trinucleotide expansion in the Huntingtin (Htt) gene. The expanded CAG repeats are translated into polyglutamine (polyQ), causing aberrant functions as well as aggregate formation of mutant Htt. Effective treatments for HD are yet to be developed. Methodology/Principal Findings Here, we report a novel dual-function compound, N 6-(4-hydroxybenzyl)adenine riboside (designated T1-11) which activates the A2AR and a major adenosine transporter (ENT1). T1-11 was originally isolated from a Chinese medicinal herb. Molecular modeling analyses showed that T1-11 binds to the adenosine pockets of the A2AR and ENT1. Introduction of T1-11 into the striatum significantly enhanced the level of striatal adenosine as determined by a microdialysis technique, demonstrating that T1-11 inhibited adenosine uptake in vivo. A single intraperitoneal injection of T1-11 in wildtype mice, but not in A2AR knockout mice, increased cAMP level in the brain. Thus, T1-11 enters the brain and elevates cAMP via activation of the A2AR in vivo. Most importantly, addition of T1-11 (0.05 mg/ml) to the drinking water of a transgenic mouse model of HD (R6/2) ameliorated the progressive deterioration in motor coordination, reduced the formation of striatal Htt aggregates, elevated proteasome activity, and increased the level of an important neurotrophic factor (brain derived neurotrophic factor) in the brain. These results demonstrate the therapeutic potential of T1-11 for treating HD. Conclusions/Significance The dual functions of T1-11 enable T1-11 to effectively activate the adenosinergic system and subsequently delay the progression of HD. This is a novel therapeutic strategy for HD. Similar dual-function drugs aimed at a particular neurotransmitter system as proposed herein may be applicable to other neurotransmitter systems (e.g., the dopamine receptor/dopamine transporter and the serotonin receptor

  19. 46 CFR 111.05-3 - Design, construction, and installation; general.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...

  20. 46 CFR 111.05-3 - Design, construction, and installation; general.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...